LEO JOSEPH BERGER vs. JEEMAN, INC., 88-001293 (1988)
Division of Administrative Hearings, Florida Number: 88-001293 Latest Update: May 27, 1988

The Issue Should the Respondent, STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION, grant the applicant, JEMAAM, INC., a dredge and fill permit pursuant to the Notice of Intent dated March 2, 1988, in File No. 361414445?

Findings Of Fact The Respondent, JEMAAM, INC., is the owner and the developer of real property contiguous to state waters in Lee County, Florida. The condominium project on the property is known as Island's End Condominiums. As part of Phase III of the condominium project, Respondent JEMAAM built a dock. This dock is the subject of this administrative hearing because the Respondent JEMAAM wants to reconfigure and relocate portions of the dock structure. Respondent JEMAAM filed an application for a dredge and fill permit with the Respondent DER in order to modify the exiting dock. The Respondent JEMAAM seeks to modify the dock by relocating a 3.92' x 61' section of the existing dock to a more waterward location. This area of the dock is the southerly extension, which fronts the Petitioners' condominium unit. The application process was begun on November 3, 1987, and completed on February 26, 1988. A Notice of Intent to Issue a dredge and fill permit for the proposed project was issued on March 2, 1988, by the Respondent DER. The dock is subject to the Respondent DER's permitting requirements because the construction activity is to take place in state waters and the dock structure exceeds 1,000 square feet in size. In addition, the Respondent JEMAAM has agreed not to undertake further dredge or fill work or any other construction in wetland areas under the Respondent DER's jurisdiction unless a valid permit had been obtained for such activities. The Petitioners, LEO J. BERGER and KATHLEEN D. BERGER, are the owners of Condominium Unit Number 102 in Phase III of Island's End Condominiums in Lee County, Florida, which is adjacent to Respondent JEMAAM's dock. The Petitioners filed an administrative complaint in which they disputed the appropriateness of the Intent to Issue dated March 2, 1988. In support of their position, the Petitioners identified a number of areas of controversy and alleged that the Respondent JEMAAM's application did not meet the "reasonable assurances" required for permit issuance. The Petitioners' allegations, which are properly before the Hearing Officer, are as follows: Shallow water in the area where the new dock configuration is to be located would result in propeller dredging of littoral shallows. The proposed waterward relocation of a portion of the dock would present a navigational hazard in the channel as well as in the shallows and around the dock. The proposed relocation would cause harmful shoaling in the area, which would affect boating safety as well as the habitat. The dock relocation and associated boat traffic will disrupt and harm bird and fish habitats. The dock may be within the Estero Bay Aquatic Preserve. Based upon the evidence adduced at hearing, I find as follows as to the allegations raised by the Petitioners in their administrative complaint: There are sufficient water depths, based upon the Bathymetric profile and a number of reviews by the Respondent DER in the proposed relocation area, to prevent harmful propeller dredging by boats using the dock. However, to assure that harmful turbidity and propeller dredging does not occur, the dock extension arm can be completely handrailed in the shallow, landward area. The addition of a shielded, steady burning light and navigational markers should minimize any impediment to navigation caused by the dock relocation. The main channel is not far from this area, and most boating traffic in the general area is confined to the main channel. The additional markers and lighting requirements combine with the current conditions to alert all reasonable and prudent boaters to the hazards and challenges of the area. The evidence is inconclusive as to the extent to which the dock structure has increased shoaling in the area. Much of the shoaling is attributed to the natural conditions of the area, a back-bay coastal zone. The shoaling which has occurred is thought to be beneficial by the experts who testified at hearing because the development of grasses has increased. This creates a positive habitat for Cuban shoalweed, brittle starfish, and several species of crab. Relocation of a portion of the dock will not substantially affect the shoaling activity in the area. The bird and fish habitats in the area do not appear to be adversely affected by the current dock. It is not anticipated that the relocation of a portion of the dock will change the ongoing development of the habitats. The bird roosting area on the sandbar includes a larger variety of species now than it did before the current dock was built, according to studies done by James W. Beever III. The installation of the additional channel markers was suggested by Beever, an expert witness in the case, as a means to enhance the viability of the sandbar as a habitat. The markers aid in steering boat traffic away from the area and prevent the beaching of boats on the sandbar. James W. Beever III is the current resource and research coordinator of the Estero Bay Aquatic Preserve. Based upon his testimony, the proposed dock relocation is not within the aquatic preserve. The areas of controversy raised by the Petitioners in their administrative complaint were sufficiently met by the reasonable assurances of the Respondent JEMAAM that the purported harms would not occur. The project is not contrary to the public interest under the criteria set forth in Section 403.918, Florida Statutes, as represented by the Respondent DER in the Notice of Intent to Issue and proved at hearing.

Florida Laws (1) 409.913
# 1
RAYMOND AND IRENE MACKAY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 84-002897 (1984)
Division of Administrative Hearings, Florida Number: 84-002897 Latest Update: Jul. 26, 1985

Findings Of Fact Description of Proposed Fill Project DER proposes to deny three alternative proposals to fill all or part of Petitioners' real property located in Key West, Florida. The property is rectangular, approximately three acres in size, with 300 feet bordering Roosevelt Boulevard (High-Way A1A) to the south and approximately 300 feet bordering Key West International Airport to the north. The easterly property line is 489.4 feet and the westerly line is 434.63 feet. The Straits of Florida (Atlantic Ocean) are immediately on the other side of Roosevelt Boulevard to the south. The property has a strip of approximately 90 feet of upland and transitional wetland adjacent to Roosevelt Boulevard, with the rest of the property being covered by a salt pond of approximately 40 acres in size (Jnt. Ex. 1). Petitioners initially submitted a permit application in July, 1983, to fill the entire property for construction of multifamily housing units. On May 4, 1984, after discussion with a DER permitting official, Petitioners submitted a second application containing two alternative, less extensive development proposals. The first alternative involves the placement of fill over a 300' x 230' area (approximately 9722 cubic yards) extending 230 feet from the property along Roosevelt Boulevard out into the water. This alternative would entail construction of 24 family housing units, consisting of six basic structures, each four-stories high. The second alternative involves subdividing the property into six separate lots connected by a central fill road with cul-de- sac. Each lot, approximately .4 acres in size, would contain a single family house on pilings and an associated fill pad for parking. The fill pads would be connected to a approximately 300' x 30' entrance road constructed on fill material. Presumably, this second alternative would contain the same amount of total fill as required in the first. As it presently exists, the salt pond (a part of which applicant would fill) serves several significant and beneficial environmental functions. In regard to water quality, the pond stores, filters, and purifies large quantities of storm water which drain from the airport and South Roosevelt Boulevard. The filling of any portion of this pond would diminish this capacity. (Jnt. Ex. 1) Because of their relatively isolated nature, the organic detrital material that is produced from the leaf litter of fringing mangroves is broken down into a very fine and readily usable form by bacteria. As a result, when there is an occasional exchange between the salt pond and tidal waters, the exported organics are in a very desirable form for higher trophic levels in the food web such as small fish, crustaceans, filter feeders, and various larval forms of marine life. (Jnt. Ex. 1) The salt pond proper provides valuable habitat for fish and wildlife, most notable of which are avifauna. The pond has apparently become established as a healthy, self-sustaining ecosystem providing permanent and temporary food, shelter and refuge for many faunal species which play significant and necessary ecological roles both in the salt ponds and other tidal and brackish water systems. (Jnt. Ex. 1) Through the placement of fill and the displacement of present salt pond habitat, water quality and the biological resources in the immediate and surrounding areas would be expected to undergo degradation. (Jnt. Ex. 1) Through the encroachment of development in this area, which presently lacks residential development, biological integrity standards would be expected to fall below acceptable levels. The proposed fill areas would reduce wind- driven circulation in the pond so as to stress levels of oxygen, salinity, temperature and turbidity. Runoff from the proposed fill would introduce nutrients and elevate turbidity during storm events. Finally, elevated turbidity levels could be expected during the actual filling process and the various species of fish and wildlife now located over the project site would be temporarily disturbed by construction activities and permanently displaced in the long term through the loss of habitat. (Jnt. Ex. 1) There is a 40' zoning setback and another 50' easement owned by the City of Key West, which together form a 90' strip on the property adjacent to Roosevelt Boulevard. This 90-foot strip is largely upland and some transitional wetland. There is no zoning impediment to any of the development alternatives proposed by Petitioners. The property is currently zoned R2H (multifamily residential) by the City of Key West. II. DER's Action on the Application After DER received and reviewed Petitioners initial application on July 22, 1983, a completeness summary was sent on August 17, 1983, requesting additional information. DER received the additional information on March 23, 1984, after which it notified Petitioners that additional information was needed. Petitioners met with DER officials on April 20, 1984, and submitted additional information on May 4, 1984, including the two alternative proposals. DER issued the "Intent to Deny" all three of the proposed projects on July 19, 1984 (Jnt. Ex. 1). On May 16, 1984, a DER Environmental Specialist visited the site of the proposed projects and conducted a biological and water quality assessment. This assessment was later submitted, in report form, as the Permit Application Appraisal, dated June 7, 1984. This appraisal, uncontested by Petitioners, indicates that each of the three fill proposals would take place in waters of the state and result in water quality violations under Rules 17-3.051(1), 17- 3.061(2)(c), (j) and (r); 17-3.121(7), (13) and (28); Chapter 17-4, Florida Administrative Code; and Chapter 403, Florida Statutes. Water quality problems associated with the project were identified as diminished storm water treatment, reduced beneficial deterital material, stress on oxygen levels, salinity, temperature, and turbidity, and an introduction of nutrients. (Jnt. Ex. 1) Although a DER dredge and fill permitting official testified that any filling of the salt pond would be detrimental to the birds and animals which feed there on a daily basis, and that, in his view, a "substantial amount" of filling would not be allowed by DER, there are development projects (other than the three presented by Petitioners) which, in his view, may qualify for a permit under DER rules. DER has, in the past, issued permits authorizing the construction of above-ground residences over wetland properties. Under DER's permitting standards, one or more single-family residences could be built on the property if the structures were built on stilts, did not violate water quality standards, had acceptable drainage, and did not result in adverse storm water discharges. In evaluating such an application, any mitigation an applicant could provide, such as enhancing flushing in the salt ponds by the installation of a culvert to open water, would be balanced against any adverse impacts expected from the filling activity. The three alternative filling proposals submitted by Petitioners (including drawings and designs) do not, however as yet, fall within or satisfy these general perimeters of permitting acceptability.

Recommendation Based on the foregoing, it is RECOMMENDED: That Petitioners' application to fill (containing three alternative proposals) be denied for failure to prove compliance with applicable permitting standards contained in Chapter 403, Florida Statutes, and Chapters 17-3 and 17- 4, Florida Administrative Code. DONE and ORDERED this 26th day of July, 1985, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of July, 1985.

Florida Laws (3) 120.57403.087403.90
# 2
DEPARTMENT OF ENVIRONMENTAL PROTECTION vs DAVID H. FORT AND CLAUDIA A. FORT, 10-000521EF (2010)
Division of Administrative Hearings, Florida Filed:St. Augustine, Florida Feb. 03, 2010 Number: 10-000521EF Latest Update: Dec. 28, 2010

The Issue The issues in this case are whether Respondents, David H. Fort and Claudia A. Fort, violated certain statutes and rules of Petitioners, Department of Environmental Protection ("Department") and Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), related to the construction of a dock and boathouse and the use of sovereignty submerged lands, as alleged in the Amended Notice of Violation and Orders for Corrective Action ("Amended NOV") and, if so, whether the administrative fines, investigative costs, and corrective actions sought by Petitioners should be imposed against Respondents.

Findings Of Fact The Department is the state agency charged with the power and duty to administer and enforce the provisions of Chapter 403, Florida Statutes, and the rules promulgated in Florida Administrative Code Title 62. The Trustees are responsible for state-owned sovereignty submerged lands and ensuring that such lands are managed for the benefit of the citizens of Florida pursuant to Chapter 253, Florida Statutes, and the rules promulgated in Florida Administrative Code Title 18. The Department performs all staff duties and functions for the Trustees related to the administration of state lands. See § 253.002, Fla. Stat. David and Claudia Fort own property located at 7875 A1A South, St. Augustine, St. Johns County, Florida. The property is located adjacent to the Matanzas River, a part of the Intracoastal Waterway. The Trustees own the lands lying below the mean high water line of the Matanzas River. The Permit and Lease Harbor Engineering (“Harbor”), a marine engineering firm, acted as Respondents' agent in preparing plans and applying for the permit and lease to construct a dock and boathouse at the property. Harbor prepared and submitted to the Department five sketches or drawings showing various layouts, cross sections, and elevations of the proposed dock and boathouse. These drawings were made a part of the permit and became conditions of the permit. The permit drawings show one large covered slip, two smaller covered slips for mooring of jet skis, and a two-level boathouse. Although some of the elevations do not show walls, it is apparent that this was for the purpose of showing interior areas, such as the slips. Although difficult to see, one drawing indicates a doorway on the lower level. The elevations show window openings or "cutouts" in the walls of the boathouse, but do not indicate framed window panes. The drawings do not create a necessary conclusion that the cutouts are intended to be finished with framed window panes. On January 13, 2004, the Department issued Environmental Resource Permit and Sovereign Submerged Lands Authorization No. 55-216127-002-ES ("permit"), which authorized Respondents to construct a dock and boathouse in the Mantanzas River adjacent to Respondents' property. General Condition (a) of the permit states: All activities shall be implemented as set forth in the plans, specifications and performance criteria as approved by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall constitute a violation of the permit. On February 24, 2004, the Trustees issued Sovereignty Submerged Lands Lease No. 550034552 ("lease") to Respondents, authorizing the use of sovereignty submerged lands for a 3-slip docking facility and boathouse "as shown and conditioned" in the Department permit, which was incorporated into and made a part of the lease.2/ Paragraph 1 of the lease states that the dock and boathouse are "exclusively to be used for mooring of recreational vessels in conjunction with an upland single-family residence." Paragraph 7 of the lease states in pertinent part: This lease is given to the Lessee to use or occupy the leased premises only for those activities specified herein and as conditioned by the Department of Environmental Protection, Environmental Resource Permit. The Lessee shall not change or add to the approved use of the leased premises as defined herein . . ., shall not change activities in any manner that may have an environmental impact that was not considered in the original authorization . . . without first obtaining . . . the Lessor's written authorization in the form of a modified lease. Paragraph 26 of the lease states that the lessee shall ensure that no "structures whose use is not water-dependant shall be erected or conducted over sovereignty submerged lands without prior written consent from the Lessor." The term "water dependent activity" is defined in Florida Administrative Code Rule 18-21.003(71): "Water dependent activity" means an activity which can only be conducted on, in, over, or adjacent to water area because the activity requires direct access to the water body or sovereign submerged lands for transportation, recreation, energy production or transmission, or source of water, and where the use of the water or sovereign submerged lands is an integral part of the activity. The lease was issued for a term of five years. It expired on January 12, 2009. Enforcement History Respondents began construction of the dock and boathouse in February 2004. A Department employee, Michael Savage, inspected the dock and boathouse on June 8, 2004, while construction was in progress. Savage said he was responding to an anonymous complaint about Respondents' dock and boathouse, but Savage did not explain the nature of the complaint. Savage had the permit drawings with him during the inspection. The dock pilings were in place as well as the "shell" of the boathouse. The structure had some cutouts for windows, but no windows with panes were installed. Savage measured the structure. Savage did not see anything during his June 8, 2004, inspection that caused him to believe the structure was not being constructed in compliance with the permit, except that a copy of the permit had not been posted at the site as required by the permit. Savage said he called Respondents, left a voice message, and talked to the builder. The Department's on-line enforcement record for the June 8, 2004, inspection indicates that a call was made and a message was left: "Need to have permit posted/erosion control in place." Savage and another Department employee inspected the dock and boathouse again on July 9, 2004. Savage had the permit drawings with him during this second inspection. Three outside walls were in place and the second level of the boathouse was under construction. No window framing or glass had been installed. An overhang, extending over the northwest corner of the structure, was in place. Savage had some concern about whether the locations of the window cutouts were in compliance with the permit. In all other respects, he thought that the construction was in compliance. The structure shown in the photographs taken on July 9, 2004, looks like a small house. It does not look like a structure intended only to provide shelter to a boat slip. The Department did not communicate with Respondents about the July 9, 2004, inspection. The Department's on-line enforcement record for the July 9, 2004, inspection includes the entry "In compliance." General Condition (j) of the permit requires that within 30 days after completion of construction of the permitted system, the permittee must submit a written statement of completion using an As Built Certification Form ("as-built"). On the as-built, the permittee is required to note and explain any “substantial deviations." Instead of submitting a single as-built following the completion of the dock and boathouse, Respondents submitted three as-builts. David Fort said his purpose was to keep the Department informed about the progress of the project. On September 8, 2004, the Department received the first of Respondent's as-builts. On the as-built form, David Fort indicated that the work was substantially completed. Although Fort did not intend to mislead the Department, the construction was not substantially completed at that time. A substantial amount of work remained to be done. Savage and another Department employee inspected the dock and boathouse on September 14, 2004. Savage had the permit drawings with him for this inspection. The boathouse was not changed much from its appearance in July 2004. It had no windows or doors. Savage believed that the project was in compliance with the permit and later made a note to that effect on a sheet containing three photographs that were taken during the inspection. The Department's on-line enforcement record for the September 14, 2004, inspection indicates that Savage met with the builder and includes the entries "In Compliance" and "Built as Permitted." Matthew Kershner, Compliance Enforcement Manager for the Department, accompanied Savage on one of the inspections of the dock and boathouse. Kershner placed a telephone call to David Fort and said his purpose in calling was to respond to a complaint from a neighbor "about a large dock being constructed." Kershner told Fort that Fort could not "climatize" the boathouse. Kershner did not explain at the final hearing what he meant by the term "climatize," nor did he give any other details about his conversation with Fort. It is reasonable to infer from the evidence, however, that Kershner meant that Fort was not permitted to provide artificial heating and air- conditioning in the boathouse. Fort called Kershner later and asked if he could install fans and Kershner told Fort that fans would be acceptable. It is reasonable to infer from the photographic evidence, alone, that Kershner knew in September 2004 that the apparent plan of construction was to at least partially enclose the boathouse. However, Kershner told Fort that turning the dock into a residence or "enclosing it" was not permitted. The only reasonable meaning to ascribe to a statement that a structure cannot be enclosed is that there must be some permanent, unobstructed way to pass in and out of the structure. A room surrounded by walls, with a door, is an enclosed structure. In November 2004, the first windows were installed in the boathouse. The windows were specially made to withstand severe weather. Respondents paid $120,000.00 for the windows. On January 7, 2005, the Department received the second as-built from Respondents. Hand-written on the form is “windows installed 1-6-05.” Another Department employee, Tracy Schilling, inspected the dock and boathouse in January 2005. Schilling said the inspection was in response to a complaint from a neighbor that the dock was "extremely large" and that it was blocking the neighbor's view. Schilling reviewed the permit drawings before her inspection. The construction was still incomplete. There was framing work underway on the first floor interior of the boathouse. Schilling said it was apparent from the framing that the boathouse would have "separate rooms." Schilling believed that the dock and boathouse were in compliance with the permit. On April 13, 2005, the Department received the third as-built from Respondents. On June 28, 2005, Schilling and another Department employee inspected the dock and boathouse again. Photographs taken during the inspection show windows were installed. Framing was completed in the upstairs portion of the structure, creating two rooms, and interior walls on the first floor were finished. The rooms were at least partially furnished with chairs, tables, and a lamp. During the June 2005 inspection, Schilling observed a fiberglass shower stall, still in its box, on the dock. Schilling believed that the installation of a shower stall would violate the prohibitions in the permit and lease against structures that were not water-dependent. The Department's notes for the June 2005 inspection indicate “Minor Out-of- compliance.” Schilling said she did not consider the windows to be out of compliance because window openings were shown on the permit drawings. On the first sheet of photographs taken during the June 2005 inspection (Respondents' Exhibit 3B), someone has written, "This is sliding over into non-water dependent category - Let's talk." However, the record does not include any explanation of this handwritten comment. Schilling sent a letter to Respondents on August 29, 2005, informing Respondents that an “item” was found to be non- compliant with Condition 26 of Respondents’ permit that prohibits structures whose use is not water-dependent and that such structures must be removed within 30 days. The letter did not identify the structure that was not water-dependent. On September 7, 2005, David Fort called Schilling about the August 28 letter. Schilling told Fort that the “item” referred to in the letter was the shower stall. She told Fort that plumbing and running water were not allowed. Fort told Schilling that he was not going to install the shower. In February or March, 2006, Schilling called David Fort to request permission for Schilling and some Department employees from the Division of State Lands in Tallahassee to inspect the dock and boathouse. Schilling said State Lands employees occasionally make site visits to inspect unusual docks and marinas "that may have issues." She suggested the inspection of Respondents' boathouse because it was the "Taj Mahal of docks." The inspection was conducted by Schilling and three other Department employees. Schilling had a copy of the lease with her. The exterior construction of the boathouse was complete and the interior work was substantially complete. Schilling believed the structure was built in compliance with the permit. Respondents did not submit an as-built to reflect the final construction of the dock and boathouse. The Department's enforcement action arose as a result of Savage's September 3, 2009, inspection of the dock and boathouse. It was during this inspection when Savage first became aware of the enclosed rooms of the boathouse. He observed a children's playroom with carpeting, lighting, an air conditioning unit, cable for television, and shelves. These structures and uses are not water-dependent. Savage observed another room in the boathouse that contained an air conditioner or dehumidifier, refrigerator, kitchen-style cabinetry, glass-paned windows, kitchen-style sink connected to a water supply, television, and a microwave oven. These structures and uses are not water-dependent. Savage observed another room with a water heater and a shower stall. The room also was being used to store cleaning materials and personal property. These structures and uses are not water-dependent. Savaged observed electrical wiring throughout the boathouse. The Department allows electrical wiring only for water-dependent uses, such as an electric boatlift or for emergency lighting. On the dock adjacent to the large mooring slip, Savage observed a sink connected to a water supply, a glass-paned window, and a door that enclosed a lower level room. Savage did not think the sink was "representative of a fish cleaning station." His objection to the sink was that it had more than one basin and did not have a sign identifying it as a fish cleaning station. Also on the dock in the area of the slips, Savage observed music speakers installed on the wall, doors enclosing rooms, and a closet which was being used to store fishing reels and gear. There is a pump stored next to the boat lift in the boat storage area that pumps water out of the Matanzas River into a tank for keeping live bait. Respondents admitted that they had installed structures at the dock and boathouse that were not authorized by the permit. These unauthorized structures are a stairway and ramp to the beach, a floating platform on pilings with a metal gangway, and an "overhang" (that portion of the upper level deck on the north side of the boathouse that extends 1.5 feet beyond the outer wall of the lower level). The Department incurred $1,874.00 in investigative costs for investigation and enforcement activities associated with Respondents' dock and boathouse. Respondents did not dispute these costs. They are reasonable costs. Detrimental Reliance Respondents claim that they relied on the Department's representations following the Department's inspections of the construction and would not have installed the doors, windows, or other features in the structure if the Department had told Respondents that these structures were not authorized by the permit. The permit drawings indicate a boathouse with areas that would be semi-enclosed. However, the permit and lease limit this boathouse to a structure for the mooring and protection for boats. The boathouse is not supposed to serve as a residence or a clubhouse. It was unreasonable for Respondents to believe that the permit authorized enclosed rooms and amenities typical of an upland residence with many features that are not water-dependent. Respondents presented no evidence to show that similar boathouses have been authorized by Department permit. David Fort's actions showed that he had a complete disregard for the warnings and instructions that he received from the Department. He was told that he could not "climatize" the boathouse. He was told that he could not enclose the boathouse. He was told that he could not install the shower stall. He was told that he could not install plumbing or running water. He was told that he could not use the dock and boathouse for activities that were not water-dependent. Yet he did all of these things anyway. He built certain structures, such as the floating dock and gangway, which he knew were not authorized by the permit. It is in this context of Fort's apparent intent to do whatever he wanted with the boathouse, no matter what the Department said, that Fort's claims of detrimental reliance must be considered. The more persuasive evidence does not show that Respondents relied to their detriment on any representation by a Department employee, except for the installation of fans. David Fort asked a direct question about whether he could install fans, before the fans were installed, and was told by the Department that he could install fans. All of the other structures that are the subject of this case were installed without a prior discussion with the Department or are contrary to instructions given by the Department. Respondents point out several times that certain structures were in place before a Department inspection, facts which Respondents believe support their arguments about the structures being in compliance with the permit, because the Department saw the structures but did not object to them. Although these facts are relevant to the determination of whether the structures were, in fact and in law, in compliance with the permit, they undermine Respondents' claim of reliance. Respondents' claim of reliance is not based on any affirmative acts of the Department, but on the Department's silence. The Department's silence caused Respondents to believe that the Department would not take enforcement action, but the evidence does not show that Respondents relied on the Department's silence to construct or install any of the disputed structures.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioners issue Final Orders that impose the administrative fines and order the corrective actions set forth in the Amended Notice of Violation and Orders for Corrective Action, dated June 1, 2010, with the modifications stated above. DONE AND ENTERED this 29th day of September, 2010, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 2010.

Florida Laws (9) 120.569120.57120.68253.002253.04253.77403.121403.141403.161 Florida Administrative Code (3) 18-14.00518-21.00362-343.900
# 3
LOUISE E. STONE vs. RAYMOND B. SPANGLER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-001662 (1979)
Division of Administrative Hearings, Florida Number: 79-001662 Latest Update: Jan. 29, 1980

The Issue The issue here presented concerns the entitlement of the Applicant/Respondent, Raymond B. Spangler, to construct a boat dock of approximately 800 square feet, included in that dimension is a boat house. The Respondent, State of Florida, Department of Environmental Regulation, has indicated its intention to grant the permit application request and the Petitioner, Louise C. Stone, has opposed the Department's intention to grant the permit.

Findings Of Fact THIS CAUSE comes on for consideration based upon the Petitioner, Louise E. Stone's petition and request for formal proceedings to consider the propriety of the State of Florida, Department of Environmental Regulation's granting of an environmental permit to Raymond B. Spangler. This petition was filed after the Petitioner had received the Department of Environmental Regulation's Notice of Intent to Grant the permit. That notice was dated July 10, 1979, and a copy of that notice has been received into evidence as Department of Environmental Regulation's Exhibit No. 5. The Secretary of the Department of Environmental Regulation opted to have the Division of Administrative Hearings consider this case and on November 5, 1979, a formal hearing was held before a Hearing Officer with the Division of Administrative Hearings. The Petitioner is an adjacent landowner to the Respondent, Raymond B. Spangler, with property located on Lake Minneola. The applicant's project is located in the northwest corner of his property and is as far removed from the common property line with the Petitioner as is possible without violating setback lines. The Petitioner's property is located to the southeast of the project. The project as now contemplated calls for the construction of a boat deck and boat house with dimensions of approximately 800 square feet. The details of this construction may be found in a copy of the Application for Permit which is the Department of Environmental Regulation's Exhibit No. 1 admitted into evidence. The boat house and boat dock would be constructed on Lake Minneola, Lake City, Florida, near the town of Clermont, Florida. Lake Minneola is a navigable waterway and the boat dock and boat house would extend into the navigable water body. The discussion of the project as found in the Respondent, Department of Environmental Regulation's Exhibit No. 1 is an accurate depiction with the exception that the dock will have an increase in length from the original proposal of 70 feet to a new proposal of some 80 to 84 feet. Nonetheless, with the optimum extension, the amount of square footage still closely approximates the initially requested 800-square-foot amount. The reason for the change is due to the rise in the water level of the lake causing the mean high water line to be further landward than was the case at the time the permit was first applied for. The additional extension of the dock is necessary to allow for dry access to the water and to reach the open waterway beyond the growth of maidencane grass (Panicum Hemitomon) near the shoreline. In keeping with allowed exemptions found in Section 403.813, Florida Statutes, and Rule 17-4.04, Florida Administrative Code, 500 square feet of the deck has been constructed and this portion of the dock as constructed may be seen in the Respondent, Raymond B. Spangler's Exhibit No. 10 admitted into evidence, which is a photograph of the partially completed dock. Other photographs of the partially completed dock and the surrounding area of the lake showing the adjacent property may be found as Respondent, Spangler's Exhibits 5 through 9. The Respondent, Spangler's Exhibit No. 4, a composite which was admitted into evidence, is a series of photographs and an overlay which by scale shows a view of the completed dock and a depiction of the boat house when completed. The dock, when completed, will be constituted of a four-foot walkway extending approximately 80 to 84 feet into the water, intersecting at right angles at the terminus of the dock and forming a "T" shape. The boat house would be located adjacent to the walkway leading to the deck terminus. The dimensions of the covered boat house would be 25 feet by 14 feet. The depth of the water in the lake at the location of the continuing dock construction is sufficiently deep to allow the construction of the dock without the necessity of dredging. There is an extensive grassy community mostly constituted of maidencane (Panicum Hemitomon) and although some of the grassy community has been removed during the construction phase of the project, the denuded area may be easily reconstituted and the applicant has expressed his intent to achieve this end as a means to avoid further erosion which has started to occur at the site. None of the erosion which has occurred has interfered with the property of neighboring landowners. The impact of the continued construction in its affect on water quality would be inconsequential. Furthermore, the construction as now completed and as contemplated does not and would not constitute a hazard to navigation, nor interfere with and cause a danger to participants in water sports and related activities that take place on Lake Minneola. When the project is completed the aquatic vegetation can be expected to return and to remain as a viable wetland community. This is due to the fact that the amount of water surface covered by the project is slight and there is sufficient sunlight to support the aquatic vegetation even in the shaded areas. During the construction phase the amount of turbidity caused by the construction has been de minimis, and will be, in view of the fact that the bottom of the lake is a sand base which settles out quickly. This settling effect was seen by the project evaluator, James Morgan, Department of Environmental Regulation, when he toured the site of the construction and saw Respondent Spangler placing pilings. Morgan noted that the turbidity involved was of a short duration. The project will not interfere with fish and wildlife either in their day-to-day activities or in their propagation. None of the standards pertaining to water quality as found in Chapter 17-3, Florida Administrative Code, will be violated by the project. The project will not be an unreasonable obstruction to the view of adjoining riparian owners and the applicant does not intend to use the boat house as a dwelling. When the project was first reviewed by the State of Florida, Department of Environmental Regulation, that agency notified the Florida Game and Fresh Water Fish Commission; the St. Johns River Water Management District, and the Department of Pollution Control of Lake County, Florida. None of these agencies have made known any objection to the project and the Department of Pollution Control of Lake County has specifically indicated their lack of opposition by written comment, a copy of which may be found as the Department of Environmental Regulation's Exhibit No. 3 admitted into evidence.

Recommendation It is recommended that the Applicant/Respondent, Raymond B. Spangler, be allowed to conclude the construction of the boat deck and boat house as contemplated by the application of May 11, 1979, with the addendum that the dock length be extended to 80 feet to 84 feet as necessary; with the proviso that the applicant ensure that the grassy community be returned to its pristine condition in the area of his project, to prohibit further erosion and that these results be accomplished by the issuance of a permit pursuant to the conditions as outlined. DONE AND ENTERED this 16th day of November, 1979, in Tallahassee, Florida. CHARLES C. ADAMS, Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Robert F. Vason, Jr., Esquire Raymond B. Spangler 408 East Fifth Avenue Route 3, Box 319 Mount Dora, Florida 32757 Clermont, Florida 32711 Segundo J. Fernandez, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 403.813
# 4
HARRY AND VIVIAN STAHLER AND DONALD AND MARK STAHLER vs. JAMES H. WALKER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-004654 (1988)
Division of Administrative Hearings, Florida Number: 88-004654 Latest Update: Nov. 10, 1988

Recommendation Based on the foregoing, it is hereby recommended that a final order be entered, granting permit #05-134042-4, with the following amendments: Where the permit reads, "To install an additional 64 boat slips . . .", change to "To install an additional 21 boat slips, for a total of no more than 46 boats . . ." Add to the specific conditions attached to the permit, paragraph 7., to read: "The breakwater to be installed at the entrance of the northern basin will be angled outward along a line that, if extended, would intersect with the southeastern corner of the property on the north shore of the basin." DONE and RECOMMENDED this 10th day of November, 1988, in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 10th day of November, 1988. COPIES FURNISHED: James H. Walker, Jr. 6175 North Harbor City Blvd. Melbourne, Florida 32940 Harry and Vivian Stahler Donald and Mark Stahler 6190 North U.S. #1 Melbourne, Florida 32940 Vivian Garfein, Esquire Department of Environmental Regulation Twin Towers Office Bldg. 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel Department of Environmental Regulation Twin Towers Office Bldg. Tallahassee, Florida 32399-2400 Dale Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Bldg. 2600 Blair Stone Road Tallahassee, Florida 32399-2400

# 5
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. DONALD M. AND MARY LOU STEARNS, 89-001706 (1989)
Division of Administrative Hearings, Florida Number: 89-001706 Latest Update: Feb. 22, 1990

The Issue The issue in Case No. 89-1706 is whether the Stearns violated provisions of Chapter 403, Florida Statutes, in the construction of a dock on the Indian River. The issue in Case No. 89-1707 is whether Mr. Stearns is entitled to a dredge and fill permit for the construction of the above-described dock.

Findings Of Fact The Stearns reside at Sunrise Landing Condominium in Cocoa, Florida. The condominium complex lies on the western shore of the Indian River in north Brevard County. At this location, the Indian River is classified as a Class III water and is conditionally approved by the Department of Natural Resources for shellfish harvesting. By Purchase Agreement dated February 18, 1987, the Stearns agreed to purchase a unit at Sunrise Landings Condominiums from the developer. By subsequent Purchase Agreement Modification, the parties agreed that the Stearns had "permission to build a private boat dock providing buyer obtains all proper permits from the Army Corps of engineers and all other proper authorities." By Warranty Deed dated April 16, 1987, the developer conveyed the unit to the Stearns. The deed, which conveys a 1/72nd interest in the common elements, does not convey any right to build a dock. The deed states that the conveyance is subject to the Declaration of Condominium of Sunrise Landing II. The declaration, which was recorded prior to the deed to the Stearns, defines as Common Element the land lying adjacent and upland to the dock that the Stearns constructed. The declaration states that each unit owner owns an undivided share of the Common Element. Article III, Section 7 states: The Owner of a Unit . . . shall be entitled to use the Common Elements in accordance with the purposes for which they are intended, but no such use shall hinder or encroach upon the lawful rights of Owners of other Units. There shall be a joint use of the Common Elements . . . and a joint mutual easement for that purpose is hereby created. In February, 1987, prior to closing on their unit, the Stearns arranged with an individual named Kurt Ramseyer to construct the dock. Mr. Ramseyer completed construction of the dock on or about July 3, 1987. On or about February 22, 1987, Mr. Stearns executed an application for permit for activities in the waters of the State of Florida. The application warned the applicant that he must obtain all applicable authorizations before commencing work. The application, as well as all others completed by Mr. Stearns, was the joint Department of the Army/Department of Environmental Regulation form, effective November 30, 1982. The application describes the project as a dock consisting of two boat slips measuring 24 feet by 10 feet, a 24 foot by 4 foot pier, and a 12 foot by 12 foot deck. The application identifies as the adjacent property owners the individuals owning condominium units on either side of the Stearns' unit. Mr. Stearns did not complete the affidavit of ownership or control, in which the applicant attests that he is the record owner or, if not, will have "the requisite interest . . .before undertaking the proposed work." The Department of the Army received the application on May 11, 1987. At this time, a copy of the application was forwarded to the Department of Environmental Regulation ("DER") without the required application fee. By letter dated May 18, 1987, DER notified Mr. Ramseyer that the application fee had not been received and, until received, the application had not been officially received. DER received the application fee on May 28, 1987. By letter dated June 25, 1987, DER informed Mr. Stearns, through his designated agent, Mr. Ramseyer, that the proposed project would require a permit under Chapter 403, Florida Statutes, and that his application was incomplete. Among other items requested were descriptions of water depths within a 300-foot radius of the proposed structure, shoreline structures within 100 feet of the proposed dock, and the boats intended to be moored at the facility. By letter dated July 10, 1987, Mr. Stearns provided DER with additional information. Submitting a new application, Mr. Stearns represented this time that the proposed use was private single dwelling, rather than private multi- dwelling, as previously indicated. He also stated that the adjoining landowners were Sunrise Landings Condominium. Again, he failed to complete the affidavit of ownership or control. A partial site plan of the condominium complex shows the dock as five feet north and 45 feet south of the next nearest docks at the complex. As he had on the February 22 application, Mr. Stearns certified as true that he knew that he had to obtain all required authorization prior to commencing construction, although construction had already been completed at this time. In fact, Mr. Stearns indicated on the application, as he did on the October 27 application described below, that construction was "proposed to commence" on June 22, 1987, and was "to be completed" on July 3, 1987. The application explains a four foot increase in the length of the dock as necessitated by "water depth." Elsewhere, the application states that the river had receded four inches since March, 1987. In justifying the construction of the dock in two sections, Mr. Stearns explained that the "shallow depth of the water . . . could result in possible environmental damage to the river bottom, if power boats were allowed to be moored in close proximatity [sic] to the area of the bulkhead line." Mr. Stearns described the boats that he proposed to moor at the dock. At maximum capacity, one boat has a draft of 10 inches, and the other has a draft of 14 inches. Attached to the application is a diagram showing maximum/minimum water depths. The depths are 13"/9" at the bulkhead, 19"/15" at 10', 21"/17" at 20', 23"/19" at 30 `, 25"/21" at 40', and 26"/22" at 50'. Mr. Stearns explained: In order to minimumize [sic] the possible environmental damage to the river bottom aquatic growth, it was necessary to place the power boat mooring section of the dock a minimum of 20 feet away from the bulkhead line. Another diagram shows water depths of 22" to 26" from 50 feet to 300 feet from the bulkhead to the north and south of the dock. 15. By letter dated June 17, 1987, which Mr. Stearns attached to the July 10 application, the Department of the Army issued him a general permit for the proposed project. The letter warns that "it appears that a permit from the Florida Department of Environmental Regulation may be required." The attached diagram shows a structure with a total length of 36 feet. By letter dated July 30, 1987, DER informed Mr. Stearns that, among other things, the affidavit of ownership or control was incomplete; discrepancies existed between the original application and the most recent application, such as with respect to the names of different adjoining landowners and different proposed uses from private multi-dwelling to private single dwelling; it was unclear whether all permits were received prior to dock construction; and it was unclear what portion of the deed entitled the applicant to place the dock in its proposed location. By letter dated October 27, 1987, Mr. Stearns provided DER with additional information and submitted a partial new application. He attested to the fact that he was the record owner of the property, although he failed to provide the required legal description. As to the question involving different adjoining property owners, Mr. Stearns indicated that he believed that because the dock was located more than 25 feet from the nearest living unit, the approval of other property owners was not required. He explained that the private single dwelling unit was a condominium unit in an eight-unit building. He advised that construction of the dock was completed on July 3, 1987. As to water depths, he showed a depth of 9 inches at the bulkhead and 26 inches at 500 feet. Additionally, he showed mean low water of 12 inches at 10 feet, 16 inches at 20 feet, 23 inches at 30 feet, and 26 inches at 40 feet. By letter dated December 8, 1987, DER informed Mr. Stearns that his application was deemed complete as of October 29, 1987. By Intent to Deny dated January 8, 1988, DER notified Mr. Stearns of its intent to deny his application for a permit. The notice states that the project is not exempt from permitting procedures. The notice acknowledges the presence of about 40 piers installed at the condominium complex without the appropriate permits. The notice states that water depths within visual distance of the shoreline are relatively shallow with scattered marine grass/algae clumps in the vicinity due to the shallow water. In this regard, the notice concludes: Installation of a pier in such shallow water, less than 24 inches deep, for permanent mooring of a small watercraft will probably cause localized disturbance of the benthic community by prop wash. This situation is already evident at several of the nonpermitted piers. Additionally, the Notice of Intent raised the issue of ownership or control. Citing an earlier final order, the notice states that "`the Department will not knowingly issue a permit for dredging and filling or other activities which would constitute a trespass on private property."' By Petition for Administrative Hearing filed January 19, 1988, Mr. Stearns requested an administrative hearing on the Intent to Deny his application for a permit. By letter dated January 27, 1988, assistant general counsel for DER confirmed a recent telephone conversation with Mr. Stearns and stated that, pursuant to that conversation I will hold your petition pending further action by the Department towards resolution of the situation. If it appears that an amicable resolution cannot be reached, I will forward the petition to the Division of Administrative Hearings for the assignment of a hearing officer. By Notice of Violation and Orders for Corrective Action dated December 19, 1988, DER notified Mr. and Mrs. Stearns and 101 other persons owning or having owned units at Sunrise Landing Condominiums that an investigation of the property on June 2, 1987, had disclosed that 43 docks had been installed and placed less than 65 feet apart with 75 boat slips. These docks had been constructed without permits. A meeting with unit owners on March 15, 1988, had not produced a resolution of the dispute. The Notice of Violation alleges that the docks extended up to 20 feet waterward of the bulkhead through water depths of 8-24 inches. The docks allegedly were constructed within an area conditionally approved by the Department of Natural Resources for shellfish harvesting, but without a Department variance. The docks allegedly resulted in damage to state waters and pollution through localized disturbance of the benthic community by associated boat traffic prop wash in shallow water. The adversely impacted submerged bottom allegedly is highly productive with scattered seagrasses providing valuable fishery resources for the Indian River. Lastly, DER alleges that it had incurred investigatory expenses of at least $1500. After reciting the statutes allegedly violated by the construction of the docks, the Notice of Violation demands, among other things, the removal of all of the docks. By Petition for Formal Proceeding filed January 12, 1989, Mr. and Mrs. Stearns requested a formal administrative hearing on the Notice of Violation. Pursuant to notice, DER held an informal conference with numerous owners of docks, including Mr. and Mrs. Stearns, on February 9, 1989. At the conclusion of the meeting, DER agreed to hold open the informal conference period for an additional 30 days to allow settlement negotiations to be concluded. By Amended Notice of Violation and Orders for Corrective Action dated March 23, 1989, DER issued another notice of violation against the ten remaining dock owners, including Mr. and Mrs. Stearns, who had not yet removed or agreed to remove their docks. The allegations are substantially identical to those of the original Notice of Violation. Because of the failure of settlement negotiations, DER transmitted both files involving the Stearns to the Division of Administrative Hearings on March 31, 1989. In several prior cases, DER had previously informed other unit owners seeking to build a dock off of the bulkhead adjoining the Common Element that no permit was required because the project was exempt under Section 403.813(2)(b), Florida Statutes. In March or April, 1987, DER changed its position on this point. The docks 45 feet north and 5 feet south of the Stearns' dock were constructed without a dredge and fill permit, apparently in reliance upon the same exemption to which the Stearns claim to be entitled in the subject cases. The operation of boats in the vicinity of the dock constructed by Mr. and Mrs. Stearns would stir up the submerged bottom and result in prop dredging of critical vegetation. In sum, the intended use of the dock would disrupt the benthic community. At times, the Stearns have been unable to reach their dock with their boats due to the shallowness of the water. The waters of the Indian River surrounding the Stearns' dock are Class III waters that the Department of Natural Resources has conditionally approved for shellfish harvesting. The Department of Natural Resources has not granted the Stearns a variance for the construction of the dock. The dock is less than 500 square feet of total coverage. The moorings from the dock five feet to the south of the subject dock remained in place following the removal of the remainder of the structure. At the time of the application, the Stearns dock, whose construction had begun no later than June 22, 1987, and been completed on July 3, 1987, was 45 feet south of the nearest dock to the north and 5 feet north of the nearest dock to the south. Both of these docks had been built under claims of exemption. The Stearns dock was maintained for the exclusive use of the Stearns and was not available to other unit owners. DER has failed to prove any investigatory expenses directly attributable to the Stearns, as opposed to the 103 unit owners in general. Moreover, given the pending applications, which disclosed most of the specifics of the subject dock, including inadequate water depths, no portion of the investigation could properly be attributed to the Stearns, especially when the sole witness for DER could not testify to any specific damage to submerged bottom and vegetation caused by boats using the Stearns' dock. Additionally, actual damage and the investigatory expenses attributable thereto are divisible and could have been attributed to a particular violator, but were not.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Regulation enter a Final Order denying the subject permit and ordering Mr. and Mrs. Stearns to remove their dock, upon such conditions as are necessary to avoid damage to the environment, but not imposing any administrative fine. ENTERED this 22nd day of February, 1990, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of February, 1990. APPENDIX Treatment Accorded Proposed Findings of DER 1-11: adopted or adopted in substance. 12: adopted as to general shallowness and excessive shallowness with respect to the passage of boats. 13-15: adopted or adopted in substance. 16: rejected as irrelevant. 17-24: adopted. 25: rejected as recitation of testimony, unsupported by the greater weight of the evidence, and irrelevant. Treatment Accorded Proposed Findings of the Stearns 1-3: adopted or adopted in substance, except that last sentence of Paragraph 3 is rejected as subordinate. 4: adopted. 5: rejected as unsupported by the greater weight of the evidence. Placing a dock in water too shallow for safe boating may arguably constitute a navigational hazard. 6: adopted. 7: rejected as unsupported by the greater weight of the evidence. In the first place, the facts at the time of the application should control whether the project was, at the time of its actual construction, exempt from the permitting requirements. In addition, the evidence showed that the pilings of at least the closer dock remained in the water following the removal of the decking. 8: first two sentences adopted. Second sentence rejected as unsupported by the greater weight of the evidence. 9: [omitted.] 10: rejected as unsupported by the greater weight of the evidence. It is clear from the operative documents--namely, the warranty deed and declaration of condominium--that Mr. and Mrs. Stearns lack the legal right to use the Common Element in the manner that they have used it. A clause in an unrecorded contract, which probably does not survive closing, cannot diminish the rights of other Unit Owners in their undivided shares of the Common Element, which, in part, the Stearns have seized for their private use. 11: first paragraph adopted. Second paragraph rejected as irrelevant and unsupported by the greater weight of the evidence. COPIES FURNISHED: Dale H. Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Steven A. Medina Assistant General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Frank J Griffith, Jr. Cianfronga, Telfer & Reda 815 South Washington Avenue Titusville, FL 32780

Florida Laws (8) 120.57403.031403.087403.0876403.121403.141403.161403.813
# 6
BOARD OF PILOT COMMISSIONERS vs. HOWARD P. KRUEGER, 82-001972 (1982)
Division of Administrative Hearings, Florida Number: 82-001972 Latest Update: Jan. 06, 1983

Findings Of Fact Howard P. Krueger is a licensed deputy pilot for the Port of Tampa and was so licensed at all times here relevant. Shortly after 8:00 p.m. on 28 February 1982 the M. V. SNOWDRIFT piloted by Respondent Krueger left her berth at the northeast end of Garrison Channel near Davis Island in upper Tampa Bay, and, with the assistance of two tugs, moved to the center of the turning basin headed south to exit Tampa through Sparkman Channel. When in this position, the two tugs were let go and the M. V. SNOWDRIFT started down Sparkman Channel at slow speed. At 6:10 p.m. on 28 February 1982 the tank barge OCEAN 135 commenced discharging gasoline to Cities Service Company at the Tampa Electric Company dock, which is located at the northeast side of Sparkman Channel. The pumping from the OCEAN 135 was in progress as the M. V. SNOWDRIFT passed the moored OCEAN 135. The only evidence presented by the Petitioner was Exhibit 1, a copy of the log of the tank barge OCEAN 135, for February 28, 1982. All entries contained therein are as follows: CITCO Tampa, Florida Voyage 505 1650 Arrival 1710 Secure 1730 Gauged 1745 Hose on regular 1800 Hose on no lead 1810 Start regular 1810 Start no lead At app 2030 while the OCEAN 135 was moored to the dock at T.E.C.O., Hookers Point discharging gaso- line to Cities Service Co. the vessel "Snowdrift" got underway on the opposite side of the turning basin - when she got on a sourtherly heading in mid-channel she let go her tugs & struck out for sea at an extreme engine order & when she was abeam of the OCEAN 135 she was throwing a wake & did part two of my mooring lines &forced me to shut down. /s/ Stevens No time was entered in the log when the pumping was shut down as the log entry states; nor was the log entered when pumping recommenced, if that occurred on February 28. The captain of the tug, Evon St. Phillip, who assisted the M. V. SNOWDRIFT away from the dock and positioned her in the turning basin on February 28, 1982, testified that when he let go he proceeded south through Sparkman Channel alongside the M.V. SNOWDRIFT, that the speed of the SNOWDRIFT as they passed the OCEAN 135 was between one and 1.5 knots, and that he saw no wake of the M. V. SNOWDRIFT hit the OCEAN 135. Captain Krueger testified that he saw the OCEAN 135, knew she was discharging dangerous cargo (by the red lights shown) and that when the M.V. SNOWDRIFT passed the OCEAN 135 she was making between 1.5 and 2.0 knots. Because the log of the OCEAN 135 is incomplete in not logging the time when the Dumping operations were shut down, because I do not believe the "extreme engine order" logged could be heard (or observed by Stevens) the 250 to 300 yards he was distant from the M. V. SNOWDRIFT when the SNOWDRIFT's engines were ordered ahead, and because ships do not accelerate rapidly from a stopped position, the live testimony, that the M. V. SNOWDRIFT was proceeding at 1.5 to 2.0 knots when she passed the OCEAN 135, is deemed more credible than the inference that could be drawn from Exhibit 1, that the M. V. SNOWDRIFT was making excess speed as she passed the OCEAN 135. The speed limit in Sparkman Channel as established by the code of she City of Tampa is 4.0 knots. The M. V. SNOWDRIFT was light when she departed Tampa on 28 February 1982 with a draft of about 12 feet forward and 22.5 feet aft. This vessel is 570 feet in length and is over 11,000 gross registered tons.

Florida Laws (1) 310.101
# 7
PETER W. MANSFIELD vs. PATCO, INC. & DER, 79-000528 (1979)
Division of Administrative Hearings, Florida Number: 79-000528 Latest Update: Jun. 27, 1979

Findings Of Fact Patco proposes to build a dock offshore of a condominium it is now constructing on Anna Maria Key in Manatee County, Florida. At the proposed dock, condominium residents could moor 22 boats in Watson's Bayou, which opens onto Sarasota Pass (also known as Anna Maria Sound). A house owned by Mildred S. Mansfield, petitioner Peter's mother, sits on a waterfront lot on the north shore of Watson's Bayou. The main part of the proposed dock would parallel the edge of the bayou, running 248 feet in a north-south direction, 30 to 45 feet offshore. Some 47 marine pilings six inches in diameter would support the decking on the main part, which would be elevated four feet above mean sea level. At its mid- point, the main part of the dock would be joined to the land by a perpendicular- access walkway with the same open substructure and at the same height as the main part of the dock. Of the ten pilings planned as the foundation for the access walkway, six would be seaward of the mean high water line. Eleven catwalks or finger piers are planned to extend perpendicularly into the bayou from the main part of the dock, at intervals of 24 to 28 feet. Two six inch marine pilings would support each catwalk or finger pier at a height of slightly more than three feet above mean sea level. Between every pair of finger piers, two boat slips are planned; and slips are planned on either side of every finger pier. Between every pair of slips not separated by a finger pier, Patco proposes to place a mooring piling, equidistant from the two finger piers nearest it. These ten mooring pilings would stand seaward of the finger piers, but no more than 70 feet seaward of the mean high water line. Patco also plans to put in two pilings along each of two imaginary lines, running shoreward from either end of the main part of the dock, and perpendicular to the main part of the dock. The purpose of these pilings, which would be about eight feet apart, would be to discourage boat traffic between the main part of the dock and the shore. Two boulders would be placed in shallow water for the same purpose. A water system and electrical service are planned for the dock, but neither fuel nor lubricants are to be dispensed and no waste or sewage system is planned. Patco plans to operate the facility, including emptying containers it intends to provide for trash, until it sells the dock to an association of slip owners, who will take over its management. Patco will not allow people to live aboard boats moored at the dock and a condition of any sale to an association will be that the association not allow live-aboards. With occasional breaks, there is a fringe of black, white and red mangroves along the shore opposite the main part of the proposed dock. Louise Robertson testified without contradiction that mangroves bordering Patco's property have been trimmed and in some cases cut down. The access walkway is planned for one of the natural breaks in the mangrove fringe, however, a spot where there are no mangroves. Applicant's Exhibit No. 6. The waters of Watson's Bayou are Class III waters. Experience with a similar dock built by Patco near the proposed site some 15 months before the hearing indicates that the proposed dock would not violate DER's water quality standards. Shortly before the hearing, a biologist's superficial examination of waters in the vicinity of the dock that has been built revealed no water quality problems as a result of the dock. Increased boat traffic in the vicinity would result in additional oils and greases in the water but, after reasonable opportunity for mixture with the waters of Watson's Bayou, oils and greases would probably not exceed 15 milligrams per liter, or otherwise violate the criteria set forth in Rule 17-3.05(2)(r) Florida Administrative Code. Patco plans to engage a subcontractor to put the pilings in. The subcontractor would "jet" the pilings by using a pump mounted on a barge to force water down to the bottom through a hose. This process would result in sand being temporarily suspended in the water. Patco proposes to curtain off or "diaper" the area where pilings are to be jetted in, so as to contain the turbidity, and so as to keep silt out of an oyster bed nearby. The parties stipulated that the project would not violate turbidity standards, if such precautions are taken. The parties also stipulated that the proposed dock would not violate DER's dissolved oxygen or biochemical oxygen demand standards. The evidence established that DER has reasonable assurance that none of its water quality standards would be violated by the dock Patco proposes to build. At mean sea level, there is ample water at the site of the proposed slips to float any vessel capable of entering Watson's Bayou from the waters outside. The channel into Watson's Bayou from Sarasota Pass is only three feet deep at low tide. This shallow channel prevents boats drawing more than a few feet from entering the Bayou through the channel, but a 46 foot ketch once came in on a high tide. In the proposed slips, mean sea level depths would range from six or seven feet at the seaward end of the finger piers to three or four feet at the landward end of the slips. Mean low water depths are about seven/tenths of a foot lower. With a spring tide, the water may fall six inches below mean low water levels. There is virtually no danger that boats would run aground in the proposed slips. The bottom underneath the proposed dock is sandy and wholly devoid of grasses or other marine vegetation. Between the shore and the main part of the dock however, there is an oyster bed whose northern edge is approximately five or ten feet south of the site proposed for the access walkway. This oyster bed extends about 280 feet in a southerly direction, but does not extend as far west as the site proposed for the main part of the dock. Jetting in the proposed pilings would not result in the death of a single oyster. As long as boats stay on the seaward side of the main part of the proposed dock, the oysters would not be harmed by boat traffic. Other fauna at the site include some benthic polychaetes, tunicates and other arthropods. The jetting in of pilings would injure and displace any of these creatures who were in the immediate vicinity, but their mobility is comparable to that of fishes and they would soon reestablish themselves. Once in place, the pilings would afford a habitat for barnacles and related marine life. A public boat launching ramp is situated 150 to 200 feet from the southern end of the proposed dock. The ramp is far enough away from the proposed dock that construction of the dock would not interfere with launching boats. The water in this part of Watson's Bayou is deep enough that the proposed dock would not create a serious impediment to navigation. Under certain wind conditions, however, a sailboat beating into the main part of Watson's Bayou from the ramp might have to make an additional tack or two if the proposed dock is built. Conversely, with southerly winds, a boat under sail making for the ramp from the main part of Watson's Bayou might have to tack more often if Patco builds the dock it proposes. The dock Patco plans to build would not create a navigational hazard nor cause erosion of the shoreline. The parties stipulated that the dock would not substantially alter or impede the natural flow of navigable waters. The State of Florida owns the bottom into which Patco plans to jet pilings. Respondent DER contacted Florida's Department of Natural Resources about the proposed dock in October, 1978. By letter dated November 21, 1978, the Department of Natural Resources advised the DER that the project would "not require a lease . . . as this application is considered a private dock." DER's Exhibit No. 1. On the strength of biological and ecological surveys and repeated visits to the site by Linda Allen, an environmental specialist in DER's employ, the DER gave notice of its intent do issue the permit Patco seeks. The foregoing findings of fact should be read in conjunction with the statement required by Stuckey's of Eastman, Georgia v. Department of Transportation, 340 So.2d 119 (Fla. 1st DCA 1976), which is attached as an appendix to the recommended order.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That DER grant Patco's application for permit on the following conditions: That no submerged or transitional vegetation be destroyed in constructing the dock. That the construction area be diapered so as to restrict siltation to the smallest practicable space and, in any event, so as to separate the work area from the oyster bed. That no dredging by any method be used to gain access to the dock. That the owner of the dock allow no docking except in slips seaward of the main part of the dock. That the owner of the dock maintain lines and floats between the ends of the main part of the dock and the landward pilings; and take other appropriate steps to discourage boat traffic between the main part of the dock and the shore. That the owner of the dock forbid living on board boats moored at the dock; forbid the discharge of sewage and garbage into the water; and furnish trash receptacles for the dock. DONE and ENTERED this 6th day of June, 1979, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 APPENDIX Paragraphs one through eleven, thirteen through seventeen and nineteen through twenty-two of respondent Patco's proposed findings of fact, have been adopted, in substance. Paragraph twelve of respondent Patco's proposed findings of fact has been adopted insofar as the plan for pilings and boulders. The evidence did not establish that this, without more, would suffice to protect marine life on the bottom between the shore and the main part of the dock. Paragraph eighteen of respondent Patco's proposed findings of fact reflects the evidence in that it was shown that the proposed dock would not degrade water quality below minimum standards for Class III waters; but degradation of water quality as a result of oils and greases can be expected, within lawful limits. COPIES FURNISHED: Dewey A. Dye, Jr., Esquire Patricia A. Petruff, Esquire Post Office Box 9480 Bradenton, Florida 33506 Alfred W. Clark, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Peter W. Mansfield 1861 Meadow Court West Palm Beach, Florida 33406

Florida Laws (1) 120.57
# 8
JOE PAIR vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-002948 (1983)
Division of Administrative Hearings, Florida Number: 83-002948 Latest Update: Jun. 29, 1984

The Issue This case arises out of the denial by the Department of Environmental Regulation of an application by the Petitioner to construct a 24-slip marina on Bayou Chico in Pensacola, Florida. At the formal hearing, Petitioner testified on his on behalf and offered and had admitted into evidence one exhibit. The Respondent called as its only witness, Jeremy Craft, and offered and had admitted into evidence four exhibits. Counsel for the Respondent submitted proposed findings of fact and conclusions of law for consideration by the Hearing Officer. To the extent that those proposed findings and conclusions are inconsistent with this order, they were rejected as not being supported by the evidence or as unnecessary to a resolution of this cause.

Findings Of Fact On March 18, 1982, Petitioner applied for a permit to dredge approximately 78,480 cubic yards from Bayou Chico and an unnamed embayment adjacent to the Bayou. The proposed project site is located in Pensacola, Florida, Bayou Chico in Section 59, Township 2 South, Range 30 West. Specifically, the project site is located on the south side of Bayou Chico just north of the Barrancas Avenue Bridge. On April 15, 1982, the Respondent, Department of Environmental Regulation, sent a completeness summary to the Petitioner requesting additional information before the application or permit could be processed. Over a period of approximately a year and a half, Department of Environmental Regulation conferred with Petitioner concerning the proposed project and a number of different plans were discussed. In July of 1983, Petitioner submitted the July 11, 1983 plan, with modifications, and withdrew all prior plans. It is this plan which is the subject of this hearing. A field appraisal of the proposed site was made by Department of Environmental Regulation on December 25, 1982. On August 31, 1983, Department of Environmental Regulation issued an Intent to Deny the Petitioner's permit application. The Intent to Deny encompassed all plans and revisions submitted by the Petitioner, Department of Environmental Regulation based its denial on Petitioner's failure to give reasonable assurances that water quality standards would not be violated by his project. The Department's denial also asserted that the project would also result in matters adverse to the public interest. The final proposal submitted by the Petitioner sought a permit to dredge a strip 100 feet wide by 450 feet long to a depth of 6 feet. This strip is adjacent to a spit or strip of land which separates Chico Bayou from the emboyment. This plan was subsequently modified to include dredging an additional 100 to 150 feet along the full length of the strip. This additional dredging would take the dredged area out to the deep water of Chico Bayou and was intended to eliminate a channeling effect. The purpose of the dredging is to enable the Petitioner to construct a marina or docking facility along the split. The marina would include 24 slips. The proposed dredge area gradually slopes from the shoreline to five and six foot depths 200 to 250 feet from the spit. The water in the embayment is highly polluted and at one time was used as a holding pond for mahogany logs because the wood-boring worms could not survive in the water. Bayou Chico is also very polluted and fails to meet the water quality standards found in Rule 17-3.121, Florida Administrative Code, for the parameters lead, cadmium, copper, and aluminum among others. The bayou has for many years been used for boat and barge traffic. Jeremy Craft testified on behalf of DER and his opinions as to the impact of the project on water quality and marine life were uncontroverted. In Mr. Craft's opinion, the dredging proposed by the Petitioner would result in further degradation of the water quality in Bayou Chico by eliminating important shallow areas and underwater grasses. The deepening of the dredged area would limit the amount of oxygen available to the water in the bayou thereby harming the aquatic life by freeing many of the heavy metals which are presently bound in the sediments in the bayou. The shallow areas are the most important areas in cleansing the water. With increased oxidation, the biota survive better and the water is better cleansed. Freeing the heavy metals would allow their introduction into the food chain and accumulation in living organisms. The Petitioner has not informed DER of his specific dock specifications, stormwater plans, upland development plans, or dredge disposal plans. The type of dock will determine the type of boating traffic and this will indicate the amount and content of stormwater discharge. Because of the contaminated nature of the spoil, the Petitioner must provide reasonable assurances that the spoil and spoil water will be properly retained. Petitioner testified on his own behalf but did not present any evidence relating to the impact the proposed prod act would have on water quality.

Recommendation Based upon the foregoing findings of fact and conclusions of law it is RECOMMENDED That the Department of Environmental Regulation enter a final order denying the Petitioner's application for a permit as set forth in the Intent to Deny previously issued by the Department. DONE AND ORDERED this 24th day of May 1984, in Tallahassee, Florida. MARVIN E. CHAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 FILED with the Clerk of the Division of Administrative Hearings this 24th day of May 1984. COPIES FURNISHED: David K. Thulman, Esquire Assistant General Counsel 2600 Blair Stone Road Tallahassee, Florida 32301 (904)488-9675 Joe Pair 1200 Mahogany Mill Road Pensacola, Florida 32907 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (2) 403.087403.088
# 9
MRS. A. K. DOYLE vs. B. W. PEAKE, MILDRED N. PEAKE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-000127 (1983)
Division of Administrative Hearings, Florida Number: 83-000127 Latest Update: Jun. 11, 1984

The Issue This case concerns the issue of whether the Respondents, B. W. and Mildred Peake, should he granted a permit to construct an addition to an existing dock located on the north shore of Old River in Pensacola, Florida. The Petitioner, Mrs. A. K. Doyle, testified on her own behalf and also called as a witness, Mildred N. Peake, one of the applicants. The Petitioner offered no exhibits into evidence. Mr. B. W. Peake testified on behalf of himself and his wife Mildred N. Peake. The Peakes offered and had admitted into evidence Exhibits 1-7. The Department of Environmental Regulation called as witnesses Mark Snowden and Richard Fancher. The Department offered and had admitted Exhibits 1-6. Subsequent to the final hearing, Counsel for the Petitioner and the two Respondents submitted proposed findings of fact and conclusions of law for consideration by the Hearing Officer. To the extent that those proposed findings and conclusions are inconsistent with this order, they were rejected as not being supported by the evidence or as unnecessary to the resolution of this cause.

Findings Of Fact The Respondents, B. W. and Mildred N. Peake, have filed an application for a permit to construct an addition to an existing private pier located on the north shore of Old River, adjacent to Innerarity Point. It will be centered on a lot located at 878 Innerarity Road, Pensacola, Florida. B. W. and Mildred N. Peake are the owners of the property where the existing dock is located. On December 23, 1982, the Department of Environmental Regulation by letter notified the applicants that the Department intended to grant the permit application. The Petitioner, Mrs. A. K. Doyle, filed an objection to the issuance of that permit. Mrs. Doyle's property is adjacent to the eastern boundary of the Peake property. The application, as modified, seeks to extend the existing pier by sixteen (16) feet. The existing pier is five feet wide and approximately 185 feet long. The addition is to be constructed of the same materials used in the existing pier and will rest on treated pine pilings. The purpose of the pier is to allow temporary berthing for two additional sailboats. There will be no fuel pumps or toilets on the pier. The pier will be used for private purposes only and will involve no commercial operation. Upon completion of the addition, the Peake's pier would be approximately 110 feet from the Intercoastal Waterway Channel and will not create a hazard to navigation. The Peakes have obtained approval from the U.S. Army Corps of Engineers to construct the pier extension. They have not obtained consent from the Department of Natural Resources to use the state owned lands beneath the proposed addition. The addition to the pier will total approximately 80 square feet and will require 4 pilings. There is currently an extensive grass bed consisting of Cuban Shoalweed approximately 90 feet from the shoreline. Jetting of pilings for the addition will occur approximately 103 feet from the closest point of this grass bed. The proposed addition will have no significant impact on the existing grass beds. The grassbeds in this area stop growing at the edge of the photic zone or that point at which sunlight can no longer penetrate the water. At this site, this occurs at a depth of 1.5 meters or approximately 4.8 feet. The depth of the water at the site of the proposed addition is from 8 to 10 feet. There are no grasses growing in the immediate area of the project site. The grass beds in the area contain a wide diversity of benthic microinvertebrates. The number of species and density of benthic microinvertebrates were less at the addition site. The proposed addition will not interfere with marine life or destroy marine productivity. The substrate at the immediate project site consists of coarse sand with some fines associated with the sand. During the piling installation, these fines will become suspended in the water, thus creating turbidity. The use of a turbidity screen or control device during construction would limit turbidity to the project site with very temporary, limited violation of water quality. The project will have no deleterious effect on water quality. All boats using the pier will have Coast Guard approved marina heads. These marine heads will not discharge into the waters in the area. Garbage from the boats will be disposed of at the Peake home adjacent to the pier. The pier is presently being used to permanently moor one sailboat.

Recommendation Based upon the foregoing findings of fact and conclusions of law it is, RECOMMENDED: That the Department of Environmental Regulation issue a permit for the applicants, B. W. and Mildred N. Peake, to construct an addition to their existing dock in accordance with the application as modified. The permit should contain all the specific conditions included in the Department's letter of intent dated December 23, 1982. In addition, the necessary approval from the Department of Natural Resources should first be obtained. DONE AND ORDERED this day of April 1984, in Tallahassee, Florida. MARVIN E. CHAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 27th day of April 1984. COPIES FURNISHED: Victoria Tschinkel Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 E. Gary Early, Esquire Division of Administrative Hearings Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Ralph A. Peterson, Esquire Post Office Box 12950 Pensacola, Florida 32576 James M. Wilson, Esquire Post Office Drawer 1832 Pensacola, Florida 32598