Findings Of Fact In July 1988, the Department of Health and Rehabilitative Services issued an Invitation to Bid (ITB) seeking proposals to lease approximately 26,000 square feet of space for offices and client services in Ft. Walton Beach, Florida. The ITB was the second issued, following the Department's determination that the first ITB did not result in an acceptable bid. Page 15 of the 16 page bid submittal form is entitled "Evaluation Criteria" and contains a list of weighted factors which are to be used in the evaluation of bids. In the second ITB, paragraph 3(b) of the criteria stated, "[P]rovisions of the aggregate square footage in a single building. Proposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other." (emphasis supplied) At approximately the same time as the Department's issuance of the second ITB, several meetings occurred related to concerns generated by the response to the first ITB. One meeting took place between Nelson P. Davis (the unsuccessful bidder in ITB #1) and Department representatives, including James Peters, HRS's District One Manager for Administrative Services. Davis currently leases to the Department, two adjacent buildings sited at 417 Racetrack Road, Ft. Walton Beach which comprise approximately 4,000 square feet less than the Department is now seeking. Davis' bid in response to the first ITB included utilization of a third building to meet the Department's space needs. 1/ During the meeting which included Peters, Davis, and others, it became apparent that there was confusion over the meaning of the word "location" in paragraph 3(b) of the evaluation criteria. Peters understood the word to mean "building" while Davis understood the word to mean an area which could be the site of more than one building. Following the Davis-Peters meeting, other meetings occurred at which Department officials considered the issue. While some representatives of the Department believed that the word "location" was synonymous with "building," others believed the use of "location" to be ambiguous. To clarify the Department's preference related to number of buildings, an amended page 15 of the bid submittal form was issued on July 2, 1988. The amended form, entitled "Evaluation Criteria" states in paragraph 3(b), "[P]rovisions of the aggregate square footage in a single building... Proposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two buildings provided the facilities are immediately adjacent to or within 100 yards of each other." (emphasis supplied.) The amendment was issued at the direction of James Peters and was approved by Charlene Schembera, the District I Administrator. The amendment to page 15, paragraph 3(b), is a reasonable effort by the Department to clarify their intent in previous use of the word "location." The assertion by Davis that the change was made at the instigation of James Peters in order to prohibit Davis from successfully submitting a responsive bid of three buildings is not supported by the evidence. While James Peters has expressed on at least one occasion a desire to avoid entering into further business arrangements with Davis, he has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that his participation in the decision to issue an amended paragraph 3(b) of the evaluation criteria was based on his negative personal opinion regarding Davis, nor did the evidence indicate that any other person involved in the process had negative opinions about Davis. Further, although some Department officials testified that a bid which contained more than two buildings would be deemed non-responsive and disqualified from consideration by operation of the amended paragraph 3(b), such a position probably is not tenable, but is not at issue in this proceeding in that the Department has not yet acted on bids submitted in response to the second ITB. The Department has valid reasons for attempting to concentrate its personnel and client services in a single building, or in as few buildings as is possible, 2/ however the Invitation to Bid does not restrict bidders in such a manner. The sole expression of the preference for a single building, or for not more than two buildings, is expressed in paragraph 3(b) of the evaluation criteria on page 15. The amendment to page 15 of the bid submittal form does not appear to bar the submission by Davis or by any other bidder of a responsive proposal containing more than two buildings. Page 15 is clearly entitled "Evaluation Criteria." The criteria are nine weighted "award factors" upon which "all bids will be evaluated." Paragraph 3(b), as one factor for consideration in the evaluation process, expresses a preference for a single building containing the required aggregate square footage. The paragraph further advises that proposals will be considered but fewer points awarded for proposals containing not more than two buildings closely located. The weighting factor for paragraph 3(b) of the evaluation criteria is five percent of total possible points. The clear indication of the amended paragraph is that proposals which contain more than two buildings will receive no points under 3(b). The Department's position would disqualify as non-responsive a bid of three buildings based solely on an evaluation factor worth five percent of the total available points. On the other hand, a bid containing two buildings, separated by not more than 100 yards, would apparently be responsive and would be evaluated, even if the two buildings were divided by a major highway or other substantial obstacle. The Department's proposed position is not logical, but is not raised herein since it has not yet been applied in this case.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-4392BID. DONE and ENTERED this 12th day of October, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of October, 1988.
The Issue Whether Respondent's action to reject all bids submitted in response to ITB 13-803-206, relating to the removal and replacement of the public address system at Pinellas Park High School, is illegal, arbitrary, dishonest, or fraudulent, as alleged in the Amended Petition.
Findings Of Fact On March 4, 2013, ITB was issued by Respondent for work related to the removal and replacement of the public address system at Pinellas Park High School in Largo, Florida. According to the Special Conditions portions of the ITB, the "scope" of the project is to "[p]rovide labor and materials to remove and replace the auditorium sound system as per plans and specifications by Keane Acoustics, Inc." The ITB was assigned bid number 13-803-206 by Respondent. Bids for the contract were to be submitted to Respondent by 3:00 p.m., April 11, 2013. Bids for the project were timely received from two companies. The first company, Becker Communications, Inc., d/b/a BCI Integrated Solutions (BCI), submitted a bid in the amount of $130,756.66. Petitioner submitted a bid in the amount of $116,000.00. There is a section of the ITB titled "special conditions." The special conditions provide in part that "[t]his is an ALL or NONE bid [and] [t]he entire contract shall be awarded to the lowest responsive and responsible bidder meeting the specifications." On April 22, 2013, Respondent posted a notice advising of its intent to award the contract to BCI. Although Petitioner submitted the lowest bid, Respondent determined that Petitioner's bid was non-responsive because the bid failed to include "proof of 5 years [of] experience with this type of work" as required by the special conditions of the ITB. Petitioner interpreted this provision as requiring five years of experience as a certain type of general contractor, which Petitioner had, whereas Respondent intended for the ITB to convey that five years of experience related to the removal and installation of audio equipment was the desired type of experience. Petitioner's failure to respond to the ITB in the manner contemplated by Respondent was a technical, nonmaterial irregularity.1/ Numbered paragraph six of the General Terms & Conditions of the ITB provides in part that Respondent "expressly reserves the right to reject any bid proposal if it determines that the . . . experience of the bidder, compared to work proposed, justifies such rejection." On April 24, 2013, Petitioner provided to Respondent a notice advising of its intent to protest the award of the contract to BCI. On May 3, 2013, Petitioner filed its formal protest challenging Respondent's intended action of awarding the contract to BCI. Petitioner's formal protest enumerated several grounds. Of particular concern to Respondent were Petitioner's assertions that the ITB was "inconsistent with Florida law since bidders [were] not required to submit a List of Subcontractors by the time of opening bid"2/ and that provisions of the ITB were ambiguous with respect to the type of experience required to qualify for bidding.3/ Prior to receiving Petitioner's protest, Respondent was unaware of the fact that its bid specifications governing the disclosure of subcontractors did not comply with Florida law. Upon consideration of Petitioner's grounds for protest, Respondent determined that the ITB, as alleged by Petitioner, failed to comply with section 255.0515, Florida Statutes (2012),4/ and that there was ambiguity in the language regarding the experience requirements for bidders.5/ Respondent refers to the problems with the ITB as "procedural errors." These procedural errors will be referred to herein as "irregularities" as this term is more in keeping with the nomenclature of this area of jurisprudence. Given the ITB's irregularities, Respondent decided to reject all bids. In explaining Respondent's rationale for rejecting all bids, Michael Hewett, Respondent's Director of Maintenance,6/ testified that "the [irregularities] were such that [they] potentially could give an unfair advantage to one bidder over another." As for the issue related to the requirements of section 255.0515, Mr. Hewett explained that neither of the two bidders submitted a listing of subcontractors. It would have been competitively disadvantageous to BCI if Petitioner were able to successfully argue that BCI should be disqualified for failing to provide a listing of subcontractors when Petitioner also failed to provide such listing. During the same approximate time that the ITB in the present case was issued, Respondent issued an ITB for nearly identical work to be performed at one of its other facilities (Palm Harbor). In all material respects, the Palm Harbor ITB was identical to the one at issue herein. Unlike the present case, BCI was the sole bidder for the Palm Harbor project and this distinguishing fact reasonably explains why Respondent did not reject BCI's bid for the Palm Harbor Project even though the ITB therein was plagued with the same irregularities found in the present case.7/
Recommendation Upon consideration of the above findings of fact and conclusions of law, it is RECOMMENDED: That the Pinellas County School Board enter a final order finding that the rejection of all bids submitted in response to ITB 13-803-206 was not illegal, arbitrary, dishonest, or fraudulent, and dismissing Tamco Electric, Inc.'s instant protest. DONE AND ENTERED this 16th day of October, 2013, in Tallahassee, Leon County, Florida. S LINZIE F. BOGAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of October, 2013.
Findings Of Fact Petitioner, J. D. Pirrotta Company (JDP), is a general contracting company located in Orlando, Florida. JDP has bid on projects involving construction of schools or educational facilities, including projects for Valencia Community College. Respondent, District Board of Trustees of Valencia Community College, is the governing body of the community college, with the authority to award contracts. Valencia Community College (VCC), in Bid #90/91-06, advertised for sealed bids for interior remodeling and renovation of existing buildings' modules 3 and 5, on its west campus on South Kirkman Road, in Orlando, Florida. The sealed bids were due at or before 2:30 p.m., on December 13, 1990, in the purchasing department of VCC, 190 South Orlando Avenue, Suite 402B, Orlando, Florida 32801. The Invitation to Bid includes a voluminous project manual containing instructions to bidders, various forms, a standard contract text and detailed specifications. A separate bid packet contains the set of drawings for the construction work. The advertisement of the Invitation to Bid, and Section 00100 of the Project Manual, Instructions to Bidders, paragraph 14A, reserve for the owner the right to reject any or all bids and to waive any and all "informalities". (Respondent's Exhibits #1 and #2) Section 00100, Instructions to Bidders, paragraph 18, provides: 18. SUBCONTRACTORS, ETC. The bidders at bid date shall submit to Owner a list of all subcontractors and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of the work as to which such identification is so required. Such list shall be accompanied by an experience statement with pertinent information as to similar projects and other evidence of qualifications for each such subcontractor, person and organization if requested by Owner. If Owner, after due investigation has reasonable objection of any proposed subcontractor, other person or organization either may, before giving the Notice of Award, request the apparent successful bidder to submit an acceptable substitute without an increase in bid price. If the apparent successful bidder declines to make any such substitution, the contract shall not be awarded to such bidder, but his declining to make any such substitution will not constitute grounds for sacrificing his bid security. A subcontractor, other person or organization so listed and to whom Owner does not make written objection prior to the giving of the Notice of Award, will deemed acceptable to Owner. Should the subcontractors list be revised, for any reason, architect and Owner shall be immediately notified. (Respondent's Exhibit #2) Paragraph 9, Section 00300, the bid form, provides: The following documents are attached to and made a condition of the Bid: Required Bid Security in the form of a Bid Bond. A tabulation of subcontractors and other persons and organizations required to be identified in this Bid. Required Bidders Qualification Statement with supporting data. (Respondent's Exhibit #2) Section 00700, the Public Entity Crimes statement form, includes these instructions: Any person responding with an offer to this invitation must execute the enclosed Form PUR 7068, SWORN STATEMENT UNDER SECTION 287.133(3) (a), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES and enclose it with your bid. If you are submitting a bid on behalf of dealers or suppliers who will ship and receive payment from the resulting contract, it is your responsibility to see that copy/copies of the form are executed by them and are included with your bid. Failure to comply with this condition shall result in rejection of your bid. (Respondent's Exhibit #2) The Instructions to Bidders and the drawings include a total of ten deductive alternatives to be addressed in the bids, to afford VCC some flexibility in the event the base bid might be higher than the agency's available funds. In response to the advertisement and request for sealed bids, VCC received bids from the following seven contractors: Seacoast Constructors and Consultants; JDP; Southland Construction, Inc.; Harbco, Inc.; Technical Design Systems, Inc.; Hembree Construction, Inc.; and Waltree Construction, Inc. The bids were opened publicly and read aloud beginning shortly after the submittal deadline on December 13, 1990. Jack C. Crawford, Vice-President for Administrative Services, and Stephen Richard Childress, Purchasing Manager, participated in the bid opening on behalf of VCC. Seacoast Constructors was the lowest bidder, at $1,274,000.00, base bid; JDP was the second lowest bidder, at $1,297,000.00, base bid. None of the bidders submitted bids containing all of the requested or required information. None of the bidders included a deduct alternative requested by Drawing E-10, General Notes number 2. Only JDP included the deduct alternative requested by Drawing E-6, General Notes number 2. Seacoast Constructors and Consultants failed to include Form PUR 7068, Public Entity Crimes statement, with their bid, but it executed and submitted the form to VCC on December 13th, the date of the opening. Two of the bidders, JDP and Harbco, failed to submit subcontractor lists with their bids. At the time of hearing, JDP had still not submitted its list. For this project the low base bid is within VCC's available funds, and it does not intend to rely on any of the deduct alternatives in the bids. Following the bid opening, the bid tabulation form was posted on a bulletin board in the administration building. A copy of the tabulation form was also placed in a folder which includes recommendations on other bids and which is maintained at the desk of the security guard outside the room where the bids are opened. Inside the front cover of the folder, in the bottom left hand corner, is a small typewritten statement: Failure to file a protest within the time described in S. 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. There is no evidence of any other notice of section 120.53, F.S. remedies to bidders, including in the advertisement or in instructions to bidders. JDP filed a written bid protest in a letter dated December 13, 1990 and received on December 14, 1990. The letter clearly states that it is a formal protest, pursuant to Section 120.53(5), F.S. It argues that bids submitted by Seacoast Constructors and others were unresponsive and should be rejected for failure to include the Public Entity Crimes Statement, for failure to bid on a deduct alternative, and for other reasons (immaterial, because they apply to higher bidders). The protest letter requested award to JDP. JDP met with representatives of VCC to attempt to resolve the protest. At the meeting, Joseph Pirrotta was informed that his bid was considered nonresponsive because it failed to include a subcontractors' list. The meeting did not resolve the matter, and on December 19, 1990, Joseph Pirrotta sent a follow-up letter arguing that the text of the bid instructions only require a subcontractors' list for "...portions of the work as to which such identification is so required", and nowhere in the bid packet was any reference to which were required. JDP considered that the subcontractors' list was, therefore, unnecessary. The December 19th letter also reiterated JDP's request to reject the other bids and to award the contract to JDP. The December 13th and 19th letters are the only written protests by JDP. VCC has previously awarded contracts to bidders who failed to submit a Public Entity Crimes Statement with their bid. It considers such failure an "informality" subject to waiver. It considers failure to submit a list of subcontractors an economic advantage with respect to other bidders. Representatives of VCC have recommended to its board that the contract be awarded to Seacoast Constructors, the lowest bidder.
Recommendation Based on the foregoing, it is hereby, RECOMMENDED That the District Board of Trustees of Valencia Community College enter its final order awarding the contract in Bid #90/91-06 to Seacoast Constructors and Consultant, and rejecting the protest of J.D. Pirrotta Company. DONE AND RECOMMENDED this 25th day of February, 1991, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of February, 1991. COPIES FURNISHED: Leslie King O'Neal, Esquire P.O. Drawer 1991 Orlando, FL 32802 Jeffrey S. Craigmile, Esquire Brian P. Kirwan, Esquire 390 N. Orange Ave., Ste. 2180 Orlando, FL 32801 Jack C. Crawford Vice President Administrative Services Valencia Community College P.O. Box 3028 Orlando, FL 32802
Findings Of Fact The Department issued an invitation to bid (ITB) and solicited bids for district-wide miscellaneous property management maintenance services pursuant to ITB-DOT-94-95-4004. Kemp Services, Inc. (Kemp), submitted the lowest bid for the subject ITB. Petitioner, Urban Group, Inc., submitted the second lowest bid for the subject ITB. Section 1.1 of the ITB provided: Invitation The State of Florida Department of Transport- ation requests written bids from qualified firms to MAINTAIN RIGHT-OF-WAY STRUCTURES AND VACANT LOTS BY PROVIDING CLEAN-UP SERVICES, LAWN SERVICES, LANDSCAPE SERVICES, SECURING OF BUILDINGS, AND OTHER MISCELLANEOUS HANDYMAN AND SKILLED LABOR SERVICES. ALSO PROVIDE SERVICES FOR SIGN REMOVAL FOR STRUCTURES ILLEGALLY ON THE DEPARTMENT'S RIGHT-OF-WAY OR ILLEGALLY ON PRIVATE PROPERTY IN THE FOLLOWING FIVE COUNTY AREA: BROWARD, MARTIN, PALM BEACH, ST. LUCIE AND INDIAN RIVER COUNTIES. For the purpose of this document, the term "bidder" means the prime Consultant acting for itself and those individuals, partnerships, firms, or corporations comprising the bidder's team by joint venture or subcontract. The term "bid package" means the complete response of the bidder to the Invitation To Bid, including properly completed forms and supporting documentation. [Emphasis in text.] The services were to be provided on an as-needed basis for the term of the agreement, two years. Section 1.7.1 of the ITB provided: Qualifications 1.7.1 Bidders must meet the following minimum qualifications: BIDDERS MUST HAVE AT LEAST TWO YEARS EXPERIENCE PROVIDING AT LEAST TWO (2) OF THE SIX SERVICES OUTLINED IN THE SCOPE OF SERVICES IN EXHIBIT "A". BIDDERS MUST HAVE BEEN IN CONTINUOUS BUSINESS FOR THE PAST TWO (2) YEARS AND COMPLETE FORM "F" WITH THE INFORMATION REQUESTED REGARDING WORK EXPERIENCE AND REFERENCES. ALL REFERENCES WILL BE CHECKED. FAILURE TO PROVIDE FORM "F" AND THE WORK EXPERIENCE REQUESTED WILL CONSTITUTE A NON- RESPONSIVE BID. [Emphasis in text.] Section 1.7.4 of the ITB provided: Qualifications of Key Personnel Those individuals who will be directly involved in the project must have demonstrated experience in the areas delineated in the scope of work. Individuals whose qualifications are presented will be committed to the project for its duration unless otherwise accepted by the Department's Contract Manager. Where State of Florida registration or certification is deemed appropriate, a copy of the registration or certificate should be included in the bid package. Section 1.7.5 of the ITB provided: Authorizations and Licenses The Consultant must be authorized to do business in the State of Florida. Such authorization and/or licenses should be obtained by the bid due date and time, but in any case, will be required prior to award of the contract. For corporate authorization, contact: Florida Department of State Division of Corporations The Capitol Building Tallahassee, Florida 32399 (904)487-6052 Other than the provisions above, no other licensure or authorization to do business was required by the ITB. Section 1.8.2 of the ITB provided: Responsiveness of Bids All bids must be in writing. A responsive bid is an offer to perform the scope of services called for in this Invitation to Bid. Bids found to be non-responsive shall not be considered. Bids may be rejected if found to be irregular or not in conformance with the requirements and instructions herein contained. A bid may be found to be irregular or non-responsive by reasons, including, but not limited to, failure to utilize or complete prescribed forms, conditional bids, incomplete bids, indefinite or ambiguous bids, improper undated or unsealed signatures (where applicable). Section 1.8.4 of the ITB provided: Other Conditions Other conditions which may cause rejection of bids include evidence of collusion among bidders, obvious lack of experience or expertise to perform the required work, or failure to perform or meet financial obligations on previous contracts, or in the event an individual, firm, partnership, or corporation is on the United States Comptroller General's List of Ineligible Contractors for Federally Financed or Assisted Projects. Bids will be rejected if not delivered or received on or before the date and time specified as the due date for submission. Section 1.8.5 of the ITB provided: Waivers The Department may waive minor informalities or irregularities in bids received where such is merely a matter of form and not substance, and the correction or waiver of which is not prejudicial to other bidders. Minor irregular- ities are defined as those that will not have an adverse effect on the Department's interest and will not affect the price of the Bids by giving a bidder an advantage or benefit not enjoyed by other bidders. Section 1.18.1 of the ITB provided: Award of the Contract The Department intends to award a contract to the responsible and responsive bidder who bids the lowest cost as identified in Form "C", Bid Blank, attached hereto and made a part hereof. The ITB did not specify a minimum number of employees, vehicles or hours of service for a bidder to be deemed responsible or responsive. At all times material to this case, Kemp has been in continuous business for the past two (2) years, and completed form "F" with the information requested regarding work experience and references. The Department's agent, Mr. Gentile, checked with two of the references listed by Kemp to verify information relative to this bid requirement. At all times material to this case, Kemp had at least two years experience providing at least two (2) of the six services outlined in the scope of services. The Department's agent, Mr. Gentile, checked with two of the references listed by Kemp to verify information relative to this bid requirement. While Mr. Gentile was authorized to check with all references listed by Kemp, the failure to do so does not discount the information obtained from the sources that were checked. Kemp had an appropriate occupational license to perform work in the tricounty area, but did not have occupational licenses with the City of Hollywood or Broward County. At all times material to this case, Kemp maintained a warehouse to secure the equipment to be used such as lawnmowers, trimmers, and cleaning supplies/equipment. After the bid protest was filed, the Department verified that Kemp had used the warehouse as it claimed. No evidence to the contrary was presented. The mailing address Kemp listed on the first page of its bid response was 8637 S. Sutton Drive, Miramar, Florida. Mr. Faluade resides at that address. He listed that address for mail purposes. The business address for Kemp listed on the bid response was 6200 Johnson Street, Miramar, Florida. This address is a store-front facility with limited office equipment and furniture. Kemp maintains an office at this location but stores its equipment elsewhere as noted above. Kemp was the lowest responsive, responsible bid for ITB-DOT-94-95- 4004.
Recommendation Based on the foregoing, it is, hereby, RECOMMENDED: That the Department of Transportation enter a final order dismissing Petitioner's challenge to the award of ITB-DOT-94-95-4004 to Kemp Services, Inc. DONE AND RECOMMENDED this 14th day of February, 1995, in Tallahassee, Leon County, Florida. JOYOUS D. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of February, 1995. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-5967 Rulings on the proposed findings of fact submitted by the Petitioner: Paragraphs 1 through 4, 6, and 8 are accepted. With regard to paragraphs 5, 7, and 16 noting that the additional emphasis is not in the text and that the citations are incomplete (and perhaps misleading), they are accepted. Paragraph 9 is rejected as contrary to the weight of credible evidence. Paragraph 10 is rejected as contrary to the weight of credible evidence. Paragraph 11 is rejected as incomplete, and therefore, misleading. Corporate documents may have been filed on that date, however, the weight of the credible evidence established that Kemp had been in business the requisite amount of time. Paragraph 12 is rejected as incomplete, and therefore, misleading. The business conducted by the Kemp personnel continued regardless of the business entity structure that was used. Paragraph 13 is rejected as contrary to the weight of credible evidence. Paragraph 14 is rejected as contrary to the weight of credible evidence or irrelevant. Paragraph 15 is rejected as contrary to the weight of credible evidence. Paragraph 16 is rejected as contrary to the weight of credible evidence. Moreover, no credible evidence was presented to establish that Kemp did not provide services as described in the ITB or that it was not in business the requisite time. Paragraph 17 is rejected as incomplete, and therefore, misleading. The mailing address listed by Kemp was a residential address. Paragraph 18 is rejected as irrelevant. Paragraph 19 is rejected as contrary to the weight of credible evidence. Paragraph 20 is rejected as irrelevant. Kemp probably does not have a Leon County occupational license either. It did have an appropriate occupational license at all times material to this case. Rulings on the proposed findings of fact submitted by the Respondent: 1. Paragraphs 1 through 29 are accepted. COPIES FURNISHED: Thomas H. Duffy Assistant General Counsel Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0450 Mitchell B. Polay Mark H. Klein 750 S.E. Third Avenue Suite 205 Fort Lauderdale, Florida 33316 Thornton J. Williams General Counsel Department of Transportation 562 Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Ben G. Watts, Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450
Findings Of Fact Pursuant to Section 287.042(2), Florida Statutes, the Department of Management Services (DMS), lets various Invitations to Bid (ITB) for the benefit of state agencies, cities, counties and other local government agencies so that these entities may purchase a variety of goods and services. On August 24, 1993, DMS issued Invitation To Bid #28-070-700-P. The bid was one of 225 Invitations to Bid issued by DMS in 1993. The bid was for the purchase of medium and heavy trucks. The bid which is the subject of this case involves truck #150. The truck #150 bid has thirteen pages with forty- seven options plus base truck bid blanks. General Condition 1 of the Invitation to Bid requires that "all corrections made by bidder to his price must be initialed." Other documents provided by the Department to interested bidders as part of the bid package reiterate the requirement that all price changes must be initialed. These documents include the "Checklist," a document entitled "Common Problems That Result in Bid Being Rejected" and the document entitled "Medium and Heavy Trucks Index." The requirement in General Condition I of the Invitation to Bid, that all price changes must be initialed, contains no printed exceptions with respect to "nonpreselected" options. The purpose of the requirements of General Condition 1 of the Invitation to Bid is to protect both the State of Florida as well as competing vendors. The reason for the requirement that all price changes or alterations be initialed by the vendor is to protect both the State of Florida against a successful bidder later inserting higher option prices and charging the state agencies those prices, and the vendor against the State later inserting lower prices and attempting to hold the vendor to those prices. General Condition 13 of the bid document states: LEGAL REQUIREMENTS: Applicable provisions of Federal, State and Local law and all ordinances, rules, and regulations shall govern development, submittal and evaluation of all bids received in response hereto and shall govern any and all claims and disputes which may arise between persons(s) submitting a bid response hereto and the State of Florida, by and through its officers, employees and authorized representatives, or any other person, natural or otherwise; and lack of knowledge by any bidder shall not constitute a cognizable defense against the legal effect thereof. . . (Emphasis added.) General Condition 13 incorporates Rule 60A-1.001(3), Florida Administrative Code, which permits the State to waive minor irregularities in the conformance of a bid proposal to the formal bid requirements. The lowest bidder is determined by two factors. The first factor is the price for the base truck. The base truck is the minimum truck which can be ordered in this contract with no options. It is basically a chassis with an engine. The second factor involves additions to the truck called preselected options or predetermined options. All of the other options for the particular vehicle are deemed nonpreselected options. Preselected options are generally the most frequently ordered additions to the base truck along with some other less frequently ordered options. The preselected options can vary from bid to bid; however, DMS always determines the preselected options before opening the bids. The price of any option cannot exceed retail price. There is, therefore, a ceiling for the prices of preselected and nonpreselected options. The preselected options are not announced until after the bid is posted to prevent dishonestly low prices on preselected options and to promote competitive prices throughout the contract document. The bidders therefore do not know which options are preselected when they are composing their bids. There is nothing to be gained by a bidder loading a particular option with a high markup, because the bidder cannot guarantee that the option will not be preselected. The bid evaluation price is the base truck price plus the price of the combined chosen preselected options. DMS received numerous bids on the ITB, including a bid from Petitioner and Intervenor. Atlantic Ford bid a combined price of $38,737.00, and was the apparent low bidder; Duval Ford bid a combined price of $39,944.00 and was the apparent second low bidder. Upon receipt of the bids from the bidders, the bids were held in a locked room until the bid opening. After the bid opening, the purchasing specialist assigned to this bid reviewed each bid for conformity to the general non-technical specifications. Only the Bureau of Procurement is responsible for the nontechnical review although other Bureaus or Divisions may review and have input into the review process. However, these other Divisions' input is not binding. In the nontechnical review the purchasing specialist reviewed each bid's signatures, whether or not the bid was signed in ink, and numerous other requirements. The purchasing specialist also reviewed the bids to determine if all base bid blanks and price blanks for preselected options were filled in and that no corrections were made to those prices without a bidder's initials acknowledging the change. The bids which failed to meet the general conditions of the bid for base bid items and preselected options were rejected as nonresponsive bids. After the initial nontechnical review, the bids were sent to the Division of Motor Vehicles and Watercraft for a technical evaluation. However, since each bid document contains bids for several trucks, there may be a mixture of responsive and nonresponsive bids for various trucks in the same document and the Division of Motor Vehicles and Watercraft may receive responsive and nonresponsive bids for technical review. John Bevins of the Division of Motor Vehicles and Watercraft reviewed the technical parts of the bid. This information included manufacturer's codes for options and base truck features as well as the manufacturer's retail price which no bidder can exceed. After John Bevins completed his review, he filled out a bid rejection recommendation form. John Bevins chose to include nontechnical items in his recommendation, although this was beyond the scope of his review. Mr. Bevins indicated on his bid evaluation form that Atlantic Ford failed to initial a typewritten correction on option 8206 of truck 150. Mr. Bevins returned the reviewed bids to the purchasing specialist along with his recommendation that Atlantic Ford's bid was not responsive since it failed to initial the typewritten correction on option 8206. The purchasing specialist discussed the failure of Atlantic Ford to initial the typewritten correction on option 8206 with H. P. Barker, Jr., the Bureau Chief of Procurement. H. P. Barker, Jr. has the final authority within the Bureau of Procurement to decide if a bid is responsive. He is the customary agency decision-maker on these matters. After careful consideration and discussion, H. P. Barker, Jr., determined that the failure of Atlantic Ford to initial the typewritten correction on a credit is a minor irregularity according to the Department's purchasing rules, since option 8206 was a nonpreselected option and did not effect the total bid price for determining the lowest bidder. Barker's decision was based on the State's interest in obtaining trucks at the lowest price, thereby obtaining the most goods per contracting dollar. Duval Ford conceded that the typewritten correction was faint and does not appear on photocopies of the bid. Barker testified that DMS accepts photocopies of bids. If Atlantic Ford had submitted a photocopy of its bid, as it could have legally done, then the typewritten correction would probably not have been noted by the Department or the other bidders. Barker also testified that bids are not rejected if nonpreselected option blanks are not filled in. Dealers can choose not to offer all nonpreselected options. Finally, in this case option 8206 was a credit. Even if a purchaser under the contract orders option 8206, it will pay six dollars ($6.00) less for the overall truck from Atlantic Ford than if the truck was ordered from Duval Ford. Duval Ford offered evidence from 1991, that DMS had rejected a bid of another dealer for failure to initial a price change on a nonpreselected option. However, Nelson Easom, Duval Ford's manager had not been able to discover any similar rejections in the subsequent two years. Barker testified that the policy regarding noninitialed nonpreselected options changed three years ago. DMS then decided to treat them as minor irregularities. The policy change was based on the public policy to award the lowest bid whenever possible and to prevent minor deviations in bids from causing the state to pay higher prices for goods and services. Moreover, the evidence did not show any abuse of the bid process which would occur should price changes not be initialed. The alleged "protection" afforded to bidders by requiring every change to be initialed is at best tenuous since any fraudulent price changes could easily be recognized by the party against whom the change was made. Given these facts, this case over initials appears to be much ado about nothing, and the failure of Atlantic Ford to initial its price change on a nonpreselected option is a minor irregularity and waiveable by DMS. DMS therefore did not act in an arbitrary and capricious manner by waiving the irregularity and awarding the bid to Atlantic Ford.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent issue a Final Order in this case dismissing Petitioner's formal protest and awarding the contract for the Project to Atlantic Ford. DONE AND ENTERED this 15th day of March, 1994, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of March, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-6790BID The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 16, 17, 18, and 19, of Respondent's Proposed Findings of Fact are adopted in substance insofar as material. Paragraphs 15 of Respondent's Proposed Findings of Fact was legal argument. The facts contained in paragraphs 1, 2, 3, 4, 10, 13, 17, 18, 21 and 24 of the Petitioner's Proposed Findings of Fact are adopted in substance insofar as material. The facts contained in paragraphs 11 of Petitioner's Proposed Findings of Fact were immaterial. The facts contained in paragraphs 5, 6, 7, 8, 9, 12, 14, 15, 16, 19 and 20 of Petitioner's Proposed Findings of Fact are subordinate. 9. The facts contained in paragraphs 22 and 23 of Petitioner's Proposed Findings of Fact were not shown by the evidence. COPIES FURNISHED: Charles Cook Howell, III Howell, O'Neal & Johnson Suite 1100 Jacksonville, Florida 32202 Cindy Horne Office of the General Counsel Department of Management Services Knight Building, Suite 309 2737 Centerview Drive Tallahassee, Florida 32399-0950 Kerri L. Barsh Attorney at Law Greenberg Traurig et al. 1221 Brickell Avenue Miami, FL 33131 Paul A. Rowell, Esquire General Counsel Department of Management Services 312 Knight Building 2737 Centerview Drive Tallahassee, FL 32399-0950 William H. Lindner Secretary Knight Building, Suite 307 Koger Executive Center 2737 Centerview Drive Tallahassee, FL 32399-0950
The Issue The issue in this case concerns whether the Florida Department of Transportation's (FDOT's or Department's) proposed action to award a contract to Couch Construction, L.P., is contrary to the agency's governing statutes, the agency's rules or policies, or the bid or proposal specifications.
Findings Of Fact The Florida Department of Transportation (Department) issued an Invitation to Bid (ITB) for road resurfacing on State Road 10/US 90 in Columbia County, Florida; Financial Project No. 208406-1-52-01 (The Project). Four companies submitted responses to the ITB. Couch was low bidder at $2,271,354.81, and Petitioner was second low at $2,278,263.07. The ITB incorporated the plans and specifications for the proposed highway resurfacing. The price proposal specifications stated in pertinent part: Item Number 2102-10. . .Approximate Quantity. . . 4,320.00 hours Item Number 2102-74-1 . Approximate Quantity . . .75,780.00 each day Item Number 2102-99 . . Approximate Quantity . . . 720.00 each day None of the bidders filed a timely objection to the price proposal specifications. Article 2-6, of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction states: A proposal will be subject to being considered irregular and may be rejected if it shows omissions, alternations of form, additions not called for, conditional or unauthorized alternate bids, or irregularities of any kind; also if the unit prices are obviously unbalanced, either in excess of or below the reasonable cost analysis values. After the bids were opened, each bid was reviewed by the Department to determine whether the bid was mathematically and/or materially unbalanced. The Department's Preliminary Estimates Engineer conducts an unbalanced review of the bids to determine if the bids are mathematically unbalanced. A bid is considered to be mathematically unbalanced if the prices quoted are significantly different from the approximate cost of the item to the contractor. It is very common for bids on construction projects to contain some item prices that are mathematically unbalanced. Bid prices that are mathematically unbalanced are considered by the Department to be non-material irregularities if they do not affect the order of the bidders. In determining whether a mathematically unbalanced price is material, the Department follows a policy set out by the Federal Highway Administration (FHWA). The Department has been following the same policy since at least 1992. The FHWA does not allow for materially unbalanced bids to be accepted by the Department on projects that are federally funded. A materially unbalanced bid is one in which there is a reasonable doubt as to whether award to the bidder submitting the mathematically unbalanced bid will result in the ultimately lowest cost to the Department. The Department has developed an Unbalanced Program Logic for its computer analysis of the bids. The program flags the items that are mathematically unbalanced. It flags the item with an "A" for those items that are above the tolerance window, "U" for under the tolerance window, and "F" as front-loaded items. The flagged items which are short-listed by the computer program are sent to the designer of record to verify the quantities and to verify whether the correct pay item was used. The designer of record verified that the quantities were correct for this Project. As part of the bid review, the Department does a statistical average or mean average for each of the bid items. A standard and a-half deviation either side of the mean is established. The bid items outside that standard and a-half deviation, positive or minus, are discarded. The remaining bid items are re-averaged and this second average is referred to as the "serious average." A front-end loaded item is an item for which work is performed early in the contract. Mobilization is considered a front-end loaded item. Couch's Mobilization item 2101-1B was flagged by the computer analysis. The Department did an analysis of the Mobilization item. The Department started with the difference between Couch's bid and the Petitioner's bid on this item, $18,0000.00. That amount was multiplied by the current interest rate, 10 per cent, and then multiplied by a factor of .5, which spread it over half the contract, times 180-day contract period divided by 365, one calendar year. The result was $434.84, which represents the potential advantage that could result from paying the $18,000.00 amount early in the contract. That amount, $434.84, did not materially unbalance Couch's bid. The three items identified by Petitioner as unbalanced (paragraph 3, above) were low and did not present any detriment to the Department. If those three items overran at the rate established, it would be an advantage to the Department. In evaluating unbalanced bids, the Department follows the guidance in a May 1988 memorandum from the FHWA, which addresses bid analysis and unbalanced bids. The memorandum provides that where unit prices for items bid are either unusually high or low in relation to the engineer's estimate of the price, the accuracy of the estimated quantities of the items are to be checked. If the quantities are reasonably accurate, the bid is to be further evaluated to determine whether the mathematical imbalance is materially unbalanced such that there is "reasonable doubt that award to the bidder submitting the mathematically unbalanced bid will result in the lowest ultimate cost to the Government." The analysis of a mathematically unbalanced bid to determine if it is materially unbalanced considers the effect of the unbalanced bid on the total contract amount; the increase, if any, in the contract cost when quantities are corrected; whether the low bidder will remain as the low bidder; and whether the unbalanced bid would have a potential detrimental effect upon the competitive process or cause contract administration problems later. In this case, the Department compared the unit prices (line item prices) by each bidder on the bid proposal sheet to the average unit price for that item. The average unit price is based upon an average of the bidders' unit prices bid for a given pay item and the Department's estimated unit price for that item. If an individual bidder's unit price is significantly greater or less than the average price, the Department's computer flags the item as mathematically unbalanced. Such a bid then receives further evaluation by the Department to ensure the accuracy of the original estimates of the quantities of those items for which an unbalanced unit price has been submitted. The Department also reviews the project plans for accuracy. The more in-depth review is performed to determine if there is a potential for a cost overrun or if there is an error in the Department's estimated quantities which would result in an increased cost to the Department for the project. In this case, Couch and Anderson submitted bid proposals for each of the individual line item prices contained on FDOT's form. Couch's unit price for the off-duty law enforcement item was $0.25/hour. The Department's average price for the off-duty law enforcement item was $25.22/hour. The Petitioner's quotation for off-duty law enforcement was $26.00/hour. The Department's computer analysis of Couch's bid flagged the off-duty law enforcement item as mathematically unbalanced. The quote by Petitioner for the off-duty law enforcement item was not unbalanced, and therefore was not flagged for further review by the Department. The same analysis was applied to the barricades and variable message sign items, with similar results. The Department also did an in-depth review of item 2101-B, Mobilization, for front-end loading. The result of that analysis was that, as a result of front-end loading, there was the probability of increased cost to the Department of $443.84. This small increase in the cost to the Department was not large enough to change the order of the bidders. Therefore, it was not a materially unbalanced item. The Department then made a more in-depth review of the three mathematically unbalanced items in Couch's bid and determined that none of those items were materially unbalanced, because none of them had the potential to increase the cost to the Department and none of them had the potential to change the order of the bids. In sum, the Couch bid was not materially unbalanced. The evidence in this case is insufficient to support a basis for rejecting the Couch bid.
Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the Florida Department of Transportation issue a final order in this case dismissing the Petitioner's Formal Protest and Request for Hearing; denying all relief requested by the Petitioner; and awarding the subject contract to the Intervenor, Couch Construction, L.P. DONE AND ENTERED this 7th day of May, 1999, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 7th day of May, 1999.
Findings Of Fact On September 1, 1989, Respondent issued to prospective bidders an Invitation to Bid on an electronic mailing machine pursuant to the specifications contained in the Invitation to Bid. The specifications provided that the equipment was to include a postage meter with a "postage by phone" feature. The postage by phone feature allows postage for the electronic mailing machine to be secured by a telephone call to the post office. Bids from Pitney Bowes, Inc., Petitioner, and American Business Products, Inc. were received in response to the Invitation to Bid. The bid opening was held September 29, 1989. The bid from Pitney Bowes was selected by Respondent as being the responsive low bid. The bid from Petitioner and the bid from American Business Products, Inc. were rejected as being unresponsive. Acting on the recommendation from the Superintendent and his staff, Respondent voted at its regular meeting on November 1, 1989, to accept the bid from Pitney Bowes. Thereafter, Petitioner filed a timely, formal bid protest that was based on two grounds. First, Petitioner contends that the bid was single sourced because the bid specifications were drafted so that only Pitney Bowes could file a responsive bid. Second, Petitioner contends that the bid of Pitney Bowes was not responsive. The invitation for bid provides, in pertinent part, that the electronic mailing machine with power1 stacked and console: ... shall be capable of processing up to 210 envelopes per minute; ... shall be equipped with conveyor stacker able to hold up to 900 envelopes; ... The invitation for bid provides, in pertinent part, that the postage meter with postage by phone feature: ... shall have automatic accounting functions; ... shall be interchangeable with Pitney Bowes Model 5600, mailing machine. After the Invitation to Bid was issued, Respondent learned that only a postage meter manufactured by Pitney Bowes could meet the specification that the postage meter with the postage by phone feature be interchangeable with a Pitney Bowes Model 5600. Petitioner contends that the inclusion of this requirement results in a single source bid because only Pitney Bowes, Inc. is capable of submitting a responsive bid. The requirement that the postage meter with the postage by phone feature be interchangeable with the Pitney Bowes Model 5600 had no bearing on Petitioner's bid being rejected by Respondent. The evidence failed to establish that Petitioner, or any other bidder, was prejudiced by this requirement being included in the bid specifications or that Pitney Bowes was given an unfair advantage in the bidding process. Although Respondent had a valid purpose in including this requirement among the bid specifications, it took no steps to enforce this requirement to the prejudice of the bidders. Petitioner also contends that the invitation to bid is a single source bid because the term "postage by phone" is a trademark of Pitney Bowes, Inc. There was no evidence that any bidder was prejudiced by the use of this term or that Pitney Bowes, Inc. was given an unfair advantage in the bidding process by the use of this term. The machine Petitioner's company offered did not have a postage meter with a postage by phone feature as required by the bid specifications. For that reason, Petitioner's bid was found to be not responsive. The machine Petitioner's company offered is scheduled to add a postage by phone feature in early 1990, but it did not offer this feature at the time Petitioner's response to the Invitation to Bid was submitted. Postage by phone is a feature offered by Pitney Bowes and other companies. Petitioner contends that the electronic mailing machine offered by Pitney Bowes, Inc. is not capable of processing 210 envelopes per minute and that it is not equipped with a conveyor stacker able to hold up to 900 envelopes. Petitioner further contends that the postage meter offered by Pitney Bowes, Inc. does not have automatic accounting functions. The evidence does not support these contentions. The bid submitted by Pitney Bowes, Inc. meets all specifications of the Invitation to Bid.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Palm Beach County enter a final order which rejects the bid protest filed by Complete Business Systems and which accepts the bid of Pitney Bowes, Inc. DONE AND ENTERED this day 12th day of January, 1989, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of January, 1989. APPENDIX TO THE RECOMMENDED ORDER IN CASE NUMBER 89-63I4BID The following rulings are made on the proposed findings of fact submitted on behalf of the Respondent. The proposed findings of fact in paragraph 1 are adopted in material part by paragraphs 1 and 2 of the Recommended Order. The proposed findings of fact in paragraph 2 are adopted in material part by paragraph 3 of the Recommended Order. The proposed findings of fact in paragraph 3 are adopted in material part by paragraphs 4 and 5 of the Recommended Order. The proposed findings of fact in paragraph 3 are rejected, in part, as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 4 are adopted in material part by paragraph 10 of the Recommended Order. The proposed findings of fact in paragraph 5 are adopted in material part by paragraph 6 of the Recommended Order. The proposed findings of fact in paragraph 6 are rejected as being a conclusion of law. The proposed findings of fact in paragraph 7 are adopted in material part by paragraph 9 of the Recommended Order. COPIES FURNISHED: Mr. Robert Papes Secretary and Treasurer Complete Business Systems, Inc. Post Office Box 24627 West Palm Beach, Florida 33416-4627 Robert A. Rosillo, Esquire School of Palm Beach County Post Office Box 24690 West Palm Beach, Florida 33416-4690 Thomas J. Mills Superintendent of Schools The School Board of Palm Beaten County, Florida Post Office Box 24690 West Palm Beach, Florida 33416-4690
The Issue Whether the Department of General Services should award state contracts for "walk-up convenience copiers" to Xerox Corporation in categories where Xerox was the only responsive bidder, or should reject Xerox's bid and solicit new bids on grounds that competitive bids were not received and there is no basis or excepting the award from competitive bid requirements; Whether the Department should disqualify Xerox's bid in one category for alleged material deviation from bid specifications where Xerox failed to initial a change in its bid price.
Recommendation Based on the foregoing, it is RECOMMENDED: That DGS reject Xerox's single responsive bids and readvertise; and That Xerox's bid for category Group-I, Type 3, Class 12, monthly rental acquisition plan, be rejected as nonconforming. DONE and ENTERED this 11th day of July, 1984, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 11th day of July, 1984.
The Issue The issue in this case is whether the Department of Transportation's proposed award of a contract to Daniels Janitorial Service is contrary to the agency's governing statutes, the agency's rules or policies, or the specifications of the Invitation to Bid (ITB).
Findings Of Fact In April 2004, DOT issued ITB-DOT-04/05-5002-PDW (the ITB) seeking to contract for janitorial services at two state office buildings in DeLand, Florida. The ITB included a "bid blank," upon which vendors were directed to submit their cost proposals. The bid blank was titled "MONTHLY JANITORIAL SERVICES PER SCOPE OF SERVICES." The bid blank included three spaces where each bidder was to provide cost information. The three spaces were titled as follows: "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and "TOTAL YEARLY AMOUNT BOTH BUILDINGS." In response to the ITB, DOT received 18 bids. The bids were opened at 3:00 p.m. on April 29, 2004. The lowest bid was $5,185.76, submitted by Daniels Janitorial Service, including: $4,895.76 for "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," $200.00 for "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and $5,186.76 identified as "TOTAL YEARLY AMOUNT BOTH BUILDINGS." The second lowest bid was $10,686.00, submitted by Jan-Pro Cleaning Systems, including: $9,971.00 for "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," $715.00 for "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and $10, 686.00 identified as "TOTAL YEARLY AMOUNT BOTH BUILDINGS." The third lowest bid was $67,777.77, submitted by the Petitioner. The remainder of the bids ranged between $69,600.00 to as much as $201,464.64. At the time of the opening, Diane Warnock, a DOT District Contract Specialist and Purchasing Agent in charge of the bid opening, observed that two of the bids (the Daniels Janitorial Service and the Jan-Pro Cleaning Systems bids) appeared to be very low in relation to the other bids. Ms. Warnock believed that the two lowest bids submitted were likely set forth on a monthly basis rather than annual amount, and that the bidders had failed to extend the monthly charges to an annual cost. Ms. Warnock contacted David Callaway, a DOT Procurement Analyst with statewide contract responsibilities, to discuss her observations. Mr. Callaway advised Ms. Warnock that she could contact the two low bidders and ascertain whether the bids submitted reflected a monthly or an annual cost. Ms. Warnock separately contacted each of the individuals responsible for submitting the low bids and inquired as to whether the bids reflected a monthly cost or an annual cost. Ms. Warnock learned that each vendor had submitted a monthly bid amount. Ms. Warnock multiplied the monthly amounts submitted by the two vendors by 12 to arrive at an annual cost. On the bid tabulation form, Ms. Warnock included the bid amount submitted by each bidder. For the two bidders who submitted monthly cost information, Ms. Warnock included the monthly costs submitted and the annual cost figures she had calculated. Based on annual costs, the lowest vendor was Daniels Janitorial Service with an annual bid amount of $62,229.12. Section 13.2 of the ITB provides as follows: 13.2 RESPONSIVENESS OF BIDS Bids will not be considered if not received by the Department on or before the date and time specified as the due date for submission. All bids must be typed or printed in ink. A responsive bid is an offer to perform the scope of services called for in this Invitation to Bid in accordance with all requirements of this Invitation to Bid. Bids found to be non- responsive will not be considered. Bids may be rejected if found to be irregular or not in conformance with the requirements and instructions herein contained. A bid may be found to be irregular or non-responsive by reasons that include, but are not limited to, failure to utilize or complete prescribed forms, modifying the bid requirements, submitting conditional bids or incomplete bids, submitting indefinite or ambiguous bids, or executing forms or the bid sheet with improper and/or undated signatures. Section 13.4 of the ITB provides as follows: 13.4 WAIVERS The Department may waive minor informalities or irregularities in bids received where such is merely a matter of form and not substance, and the correction or waiver of which is not prejudicial to other bidders. Minor irregularities are defined as those that do not have an adverse effect on the Department's interest and does not effect the price of the bid by giving a bidder an advantage or benefit not enjoyed by other bidders.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Transportation enter a final order awarding the contract for ITB-DOT-04/05- 5002-PDW to Daniels Janitorial Service. DONE AND ENTERED this 25th day of August, 2004, in Tallahassee, Leon County, Florida. WILLIAM F. QUATTLEBAUM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of August, 2004. COPIES FURNISHED: C. Denise Johnson, Esquire Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0450 Anthony Payne 1031 Eagles Forrest Drive Apopka, Florida 32712 James C. Myers, Clerk of Agency Proceedings Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Stop 58 Tallahassee, Florida 32399-0450 Pamela Leslie, General Counsel Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Stop 58 Tallahassee, Florida 32399-0450
Findings Of Fact In July, 1989 the District published its request for bids (number 8980) for an atomic absorption spetrophotometer in local newspapers and to prospective interested parties, as shown in joint Exhibit 1 in evidence. The specifications for the instrument were included in the bid package and were authored by Mark Rials, the District's Laboratory Supervisor. The District received two bids for the instrument in response to the request for bids, one from Varian for approximately $57,000 and one from Perkin-Elmer for approximately $59,900. Mark Rials evaluated the bids. Upon evaluation it was determined that the Varian instrument proposal did not meet bid specifications in three major areas. The specifications required a system capacity of 40 megabytes, hard drive capability. The capacity offered by Varian in its bid was for 20 megabytes. The specifications required a combination of a 5 1/4 inch disk drive for its computer system as well as a 3 1/2 inch disk drive. Varian only bid the 3 1/2 inch diskdrive. It did not offer the 5 1/4 inch disk drive which was required. Additionally, at item IX of the specifications, the District required that a list be submitted with the bid which stated, on an item-by-item basis, how the instrument met or exceeded the specifications. Each item in the specifications had been carefully selected to insure optimum performance for the laboratory so that exceptions to the specifications were required to be noted and attached in the bid response. Varian failed to conform to this item of the specifications. This item allowed a vendor to describe in its bid response how it could differently meet the specifications in a better manner or even exceed the specifications, but Varian failed to provide this itemized list. It was also determined that the Varian bid did not conform with the specifications of item IV page 4 of the invitation to bid document concerning the provision of service manuals, system and application software documentation, methods, manuals, parts catalogs, supplies, accessories, catalog, and training manuals. Conversely, it was determined that the Perkin-Elmer bid was responsive in all respects, met the bid specification in these major categories and was the most responsive bidder. After witness Rials conducted the evaluation of the bids, in terms of compliance with the specifications, he and the District determined that the Perkin-Elmer bid was the lowest, responsive bidder which met all specifications. It duly published the intended award and notified all bidders of the bid results. In this evaluation and award process it was demonstrated that the District followed all applicable procedures in its rules and policies concerning evaluation and award. Varian timely filed an objection to the award of the bid; and in accordance with its normal bid protest procedures, the District scheduled a conference between representatives of Varian and District representatives to review Varian's bid. Varian made several statements at that meeting which constituted a substantial deviation from the bid package it had earlier submitted and amounted to an attempted restructuring of its bid in an effort to meet bid specifications. The District declined to countenance this effort and adhered to its initial intent to reject the bid which was submitted by Varian and to not allow the attempted material deviations to be ascribed to Varian's bid, after the point of bid opening and announcement of award. In summary, based upon the bid specifications issued by the District the evaluator's determination concerning the specifications that the evaluator drafted was that the Varian instrument failed to meet bid specifications because of the major deficiencies in the areas found above, regarding systems capacity, computer disk drive availability, and specification response. It has clearly been demonstrated by competent substantial evidence that the District's decision to reject Varian's bid was a reasonable one. It was based solely on a fair comparison of the response of the two bids to the specifications contained in the invitation to bid and notice to all potential vendors. In consideration of the facts established by the evidence in this record, it is found that the bid by Perkin-Elmer substantially met all bid requirements or specifications, even though the Perkin-Elmer bid was the second low bidder in terms of dollar cost. Since the low-cost bidder, Varian, failed to meet major bid specifications, the facts demonstrate that the Perkin-Elmer bid was the most responsive of the two bids at issue and is, therefore, the best bid. Consequently, award should be given to the Perkin-Elmer bid for the instrument in question.
Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence of record, the candor and demeanor of the witnesses, and the pleading and arguments of the parties it is therefore RECOMMENDED: That the Southwest Florida Water Management District issue a final order denying the petition filed by Varian Instrument Group and awarding bid number 8980 to Perkin-Elmer Corporation, as the lowest, responsive bidder. DONE and ENTERED this 6th day of February, 1990, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of February, 1990. APPENDIX Respondent's Proposed Findings of Fact 1-9 are accepted. Petitioner Filed No Proposed Findings of Fact. COPIES FURNISHED: Mr. Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899 Mickey McAllister District Sales Manager Varian Instrument Group 505 Julie Rivers Road, Suite 150 Sugar Land, TX 77478 A. Wayne Alfieri, Esquire Edward B. Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899