MILTON HESS AND GAIL HESS vs. WALKER G. MILLER & DER, 80-001769 (1980)
Division of Administrative Hearings, Florida Number: 80-001769 Latest Update: Feb. 26, 1981

The Issue The issue here presented concerns the entitlement of the Applicant/Respondent, Walker G. Miller, to construct an addition to his existing boat house of approximately 450 square feet, and an addition to his existing chain link fence, both of which are located on Lake Down, Florida. The Respondent, Department of Environmental Regulation, has indicated its intention to grant the permit application request and the Petitioners, Milton and Gail Hess, and David Storey and others, have opposed the Department's intention to grant the permit.

Findings Of Fact The Petitioner in Case No. 80-1769, Milton Hess, is an adjacent landowner to the Applicant/Respondent, Walker G. Miller, with property located on Lake Down, near Windermere, in Orange County, Florida. The Petitioners in Case No. 80-1770, David Storey and others, are also landowners on Lake Down. Applicant's parcel is located on Down Point, which is a peninsular extending from the Lakes's southern shore. The project as contemplated by the Applicant is the construction of a 15 foot by 30 foot unenclosed addition on the north side of an existing dock/boathouse combination located on Lake Down. The 450 square foot addition is to be utilized as a storage room adjacent to the boathouse portion of his existing structure. The present structure has a total surface area of approximately 825 square feet. Additionally, by amendment to the application made on August 13, 1980, Applicant proposes to construct a chain link fence from the south property line to the dock facility. Lake Down is one of the waterbodies that constitutes the Butler Chain- of Lakes. The Lake is characterized by outstanding water quality and diversified biological resources. The Chain-of Lakes is widely recognized as the outstanding aquatic resource in the State, as far as water quality is concerned. Development on Lake Down is light, with widely scattered residential units separated by expanses of citrus groves. The construction of the addition will not significantly impact Lake Down or the Butler Chain-of Lakes, either on a long-term or short-term basis. The shading effect of the structure will result in a slight decline of rooted aguatic vegetation. However, such decline should be minimal. Further, reasonable assurances have been given that the proposed project would not result in any violations of State water quality criteria or standards. The existing dock structure now obstructs a portion of the view of the lake enjoyed by Petitioner Hess. However, by constructing the proposed addition on the north side of the existing boathouse, no further impediment of the view will occur.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a permit be granted by the Department of Environmental Regulation to Walker G. Miller to construct an addition to his boathouse and a chain link Fence on Lake Down as more specifically described in his amended application. DONE and ENTERED this 2nd day of February, 1981, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of February, 1981. COPIES FURNISHED: David Storey Route 3, Box 929 Orlando, Florida 32811 Jack Ezzard and Kathryn Ezzard Route 3, Box 925 Orlando, Florida 32811 Tari Kazaros Route 3, Box 924 Orlando, Florida 32811 Mrs. H. D. Barrarly Post Office Box 203 Gotha, Florida 32734 Paula M. Harrison Post Office Box 203 Gotha, Florida 32734 Ava Careton Route 3, Box 926 Orlando, Florida 32811 Nikki Clagh Route 3, Box 928 Orlando, Florida 32811 Milton and Gail Hess 4413 Down Point Lane Windermere, Florida 32786 Walker G. Miller Post Office Box 348 Windermere, Florida 32786 B. J. Heller, Esquire 644 West Colonial Drive Orlando, Florida 32804 Richard D. Lee, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 120.57
# 1
MANASOTA-88, INC., AND MANATEE COUNTY SAVE OUR BAYS ASSOCIATION, INC. vs HUNT BUILDING CORPORATION AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-002350 (1990)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Apr. 19, 1990 Number: 90-002350 Latest Update: Jan. 03, 1991

Findings Of Fact At all times pertinent to the issues herein, the Department was the state agency responsible for the regulation and issuance of dredge and fill permits for waters of the state. Hunt is a real property development company which owns the property in issue located contiguous to Sarasota Bay on the east and an artificial canal, dredged many years ago, located to the south. The property in issue includes submerged lands. Petitioners, Manasota and Manatee are environmental interest associations whose standing as parties hereto was stipulated to by Hunt and the Department. The Rosens are owners of a piece of land at the bayward end of the property located to the south of the artificial canal to the south of the property in issue. On September 2, 1988, Hunt applied to the Department for a dredge and fill permit to construct a dock system four feet wide and approximately one thousand feet in length along the northern edge of the artificial canal. Four access walkways would extend from the existing berm to the north out to the proposed dock. The request also sought permission to trim mangroves to facilitate construction of and provide access to the dock; to place 22 cubic yards of fill to stabilize an existing private road; and to relocate the existing access channel by dredging approximately 700 cubic yards of material. Petitioners do not object to the placement of the 22 cubic yards of fill. During the review process, the Department identified several deficiencies in the proposal which it required be modified before a permit could be issued. Hunt agreed to comply with all of the Department's modifying requirements. As a result, in its amended form the proposal calls for the dock to be reduced in size from 5,080 square feet to approximately 3,800 square feet; access points to be reduced from four to three; the installation of a flushing system consisting of a 30 inch culvert between the west end of the canal and the mangrove swamp to the north to enhance the water quality in the artificial canal; the submittal of historical information to demonstrate the existence of a historic canal which would support maintenance dredging; and the submittal of a mitigation proposal for the seagrasses which would be destroyed by the dredging of a new channel and for the mangroves to be trimmed to facilitate the dock construction. The revised application also sought permission to construct a previously approved (different permit) boardwalk, the mitigation for which has been completed and is apparently successful. This mitigation is located in the northern boundary of the Hunt property. The wetlands area adjacent to Hunt's north property line is a Class II, Outstanding Florida Water, (OFW). The property in issue is located contiguous to Sarasota Bay, a Class II water body designated as an OFW). This portion of the bay is not approved for shellfish harvesting. Sometime between 1951 and 1957, a channel was dredged from the Intracoastal Waterway running generally north and south in the bay, west across approximately 400 feet of bay bottom into what was then a mangrove forest on the east side of Longboat Key. The westernmost 1400 foot extension of that channel into the forest is the artificial canal in issue which receives untreated storm water runoff from Jungle Queen Way, the roadway to the south of the canal. The canal is a Class III water and is not an OFW. Approximately 1,225 feet of the southern shoreline of that canal is seawalled, with approximately 35% of the southern shoreline having mature mangrove trees along it. The entire northern shoreline is vegetated by mature mangrove trees. There is no seawall on the northern shore. The canal varies in depth from less than one foot at points to a maximum of 7 1/2 feet at other points. As a result of shoaling at the canal juncture with the bay, a sand spit has formed, and at low tide, water depth is minimal but allows the passage of shallow draft vessels if their motors are raised. The original channel has silted in to a great degree and has become vegetated by approximately 1,350 square feet of various shoal grasses. It is home to several species of water animal including crown conch, lightning whelk, venus sunray clams, jingle shell, banded tulip snail and common nassa snail as well as supporting a diverse and abundant group of bottom dwelling organisms. The grass beds are fish habitats as well as nursery and feeding grounds and fish species present include some important to commercial and sport fishing. Though the remains of the original channel are often indistinct and difficult to define, the Department, in its analysis of the application for permit, determined from a review of the documentary evidence presented , and it is also found here, that a historic channel exists as described, and is navigable at least fifty percent of the time. As such, the Department concluded that that channel qualified for the maintenance dredge exemption. The Department also concluded that a minimum amount of dredging would be required to clear the historic channel sufficiently to allow boats to utilize it during a full range of tidal conditions. The seagrass beds currently existing in the historic channel would be substantially damaged by a maintenance dredging in the area. Though the Department has no authority to require mitigation for this impact should Hunt exercised its right to maintenance dredge, as an alternative, Hunt proposed to dredge a hook shaped channel curving to the north around that portion of the historic channel which penetrates the grass beds. This alternative site is also located in Class II waters and an Outstanding Florida Water. Dredging at the alternative site would displace much the same amount of material, (approximately 700 cubic yards), and the resultant channel would be approximately the same length, width, and depth overall. The alternative site will cross an area which contains a shoal grass, Cuban Shoalweed, but utilization of this site will have a substantially lesser impact to the overall seagrass population than would dredging of the historic channel. If Hunt chooses to utilize the alternative route, it would have to comply with the Department's mitigation requirements which include transplanting the displaced grass from the alternative channel to another location. The conditions for the mitigation were developed by Department personnel in conjunction with the Department of Natural Resources whose personnel have agreed to participate in the transplantation. Hunt has agreed to undertake additional mitigation planting regardless of whether the transplant is successful. The Department has determined that Hunt's total mitigation program is sufficient to offset the adverse impacts of the proposed dredging. Any sea grasses in the area of the channel will be protected by the installation of signs indicating their location. Speed will be limited by the installation of "No Wake" zone signs, and, in addition, the natural dog-leg in the channel should minimize the impact to adjacent shorelines and reduce the potential for shoaling or erosion. The Department gathered water quality data for the area from 1988. This is consistent with the current statutory and rule criteria which permits the use of data existing in the year prior to application. To supplement this, however, the Department also required that Hunt submit water quality data for the actual project site as a part of the application process. From this input, existing ambient water quality standards were established. To insure that these existing ambient water quality standards within the OFW are maintained during construction, the Department has established a mixing zone and has indicated a requirement for the use of double turbidity curtains. Additional safeguards include limiting dredging to periods of low tide. The Department has concluded that these prosthetic activities will most likely result in maintenance of the water quality standards required for Class II and OFW. Any diminishment of those standards would be of limited duration. The Department was also satisfied that the project would not adversely impact in this area after construction was completed and the facility in operation. In support of this position, the Department relied on evidence tending to show that the design of a culvert proposed for incorporation into the project should significantly improve flushing of the water within the canal. Pollutant loading to the system should be reduced as a result of the biological filtration of the mangrove community which will absorb many of the excess nutrients currently in the canal water, and the removal of suspended solids. Expert evidence on the subject indicates that flushing time, currently estimated at 9 days, will be reduced to less than 4 days. Polluting activities, such as fueling facilities, live-aboards, and major repair and maintenance of boats in the canal will be prohibited. Any pollutants not removed by the natural filtration process described above will, therefore, remain in the canal water for less time than before. If vessels are docked in the canal, the minimal amount of resulting oil and grease pollution should not be sufficient to degrade water quality in either the canal or the bay to a point below acceptable established standards. In fact, such impact should be both non-detectable and non-measurable.. Hunt's plan calls for the removal of approximately 20 of the approximately 2,400 mangrove trees and the trimming of approximately 230 additional ones. Though this trimming, as a part of an exempt activity, is also exempt, and as a result, mitigation in not required, Hunt indicates its intention to plant 3 trees for every tree removed or trimmed, and this proposal, considered acceptable to the Department, has been incorporated as one of the permit conditions. The new mangrove area to be planted in mitigation should be fully established within 3 years of planting and will provide the same beneficial function as the replaced trees. Hunt's mitigation planting for the previously mentioned boardwalk project has been successful. To protect the manatee population as much as possible, the Department has also included conditions to the permit requiring the posting of manatee awareness signs along the canal and channel and the installation of a permanent informational display at the facility. These measures, though no guarantee of compliance by individual boaters, are currently the most effective safeguards short of prohibition of boat activity. The Department has concluded, and it is so found, that, considering the proposed project against the statutory criteria relating to dredge and fill permitting of this nature, the project, as conditioned, is in the public interest and would have no cumulative impact on the environment in the area. When the 36 special conditions attached to the permit by the Department are complied with, the effect on fish and wildlife resources in the area should be beneficial. As a result of the mitigation activities, both mangrove and seagrass populations should be increased and the shoreline enhanced. Water quality in the canal should be significantly improved above existing conditions, and the abandonment of the historic maintenance dredging operation, with its associated impacts, is clearly in the public interest. The incorporation of a permit condition precluding any subsequent maintenance dredging in the historic channel upon completion of the relocation is a safeguard clearly in the public interest. The evidence also indicates, supporting Departmental findings to that effect, that the project will not adversely affect the public health, safety, welfare or property of others; nor will it adversely affect the conservation of fish and wildlife, endangered, threatened or other. It will not adversely affect navigation or flow of water or cause harmful erosion or shoaling. It will not adversely affect fishing or recreational values or marine productivity in the area; nor will it endanger significant historical or archaeological resources which exist currently in the area.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered in this case granting a Dredge and Fill permit to Hunt Building Corporation consistent with the terms and conditions outlined in the Department's Intent to Issue, dated March 29, 1990, under file NO. 41-1542543. RECOMMENDED this 3rd day of January, 1991, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of January, 1991. APPENDIX TO RECOMMENDED ORDER IN CASES NO. 90-2350 & 90-2736 The following constitutes my specific rulings pursuant to S 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR PETITIONERS, MANASOTA AND MANATEE: 1. Accepted. 2(a) - (e). Accepted and incorporated herein. Accepted and incorporated herein. Accepted. & 6. Accepted and incorporated herein. Accepted. - 12. Accepted and incorporated herein. Rejected as contrary to the evidence. Accepted. - 17. Accepted and incorporated herein. Accepted. - 22. Not appropriate Findings of Fact. Should be in Conclusions of Law. 23. - 26. Rejected. 27. - 30. Accepted and incorporated herein. 31. - 33. Accepted. Accepted except for last clause. Not a Finding of Fact but a comment on the state of the evidence. Rejected. Not proven. Not a proper Finding of Fact and not supported by authority. Accepted and incorporated herein except that the canal is a Class III water body. Accepted and incorporated herein. Not a Finding of Fact but a Conclusion of Law. Rejected. Accepted. Accepted but not determinative of any issue of fact or law. Ultimate Fact. Rejected. FOR RESPONDENT HUNT Accepted and incorporated herein. & 3. Accepted and incorporated herein. 4. & 5. Accepted and incorporated herein. 6. & 7. Accepted and incorporated herein. 8. - 10. Accepted and incorporated herein. 11. & 12. Accepted and incorporated herein. 13. Repetitive information. 14-1 & 2. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 22. Accepted and incorporated herein. Accepted and incorporated herein. - 28. Accepted and incorporated herein. FOR RESPONDENT DEPARTMENT: 1. - 5. Accepted and incorporated herein. 6. - 8. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. - 18. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 22. Accepted and incorporated herein. 23. & 24. Accepted. Accepted and incorporated herein. - 31. Accepted and incorporated herein. 32. Accepted and incorporated herein. COPIES FURNISHED: Martin Rosen 672 Jungle Queen Way Longboat Key, Florida 34228 Thomas W. Reese, Esquire 123 Eighth Street North St. Petersburg, Florida 33701 Patricia Petruff, Esquire John V. Quinlan, Esquire Dye & Scott, P.A. P.O. Box 9480 Bradenton, Florida 33506 Cecile I. Ross, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel DER 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57403.813
# 2
GRACE L. WALDRON vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 87-001727 (1987)
Division of Administrative Hearings, Florida Number: 87-001727 Latest Update: Aug. 19, 1987

Findings Of Fact Grace L. Waldron owns the property in Osceola County where the proposed project is located. Carl Wagner leases a portion of the property and operates a fish camp/bait and tackle shop on the property. On August 22, 1986, the Petitioners submitted an application, designated DER File No. 49-124177-4, to dredge an access canal which would connect an existing elongated borrow pit with Lake Cypress, and to construct two commercial piers, 300 feet long by 4 feet wide, with sixty finger piers, 12 feet long by 2 feet wide. The borrow pit, also called the "existing canal" is approximately 50 feet wide by 800 feet long. The dredging would create a dead end finger canal approximately 1160 feet in length. Approximately 5,800 cubic yards of muck, hard pan and clay would be dredged to create the canal and channel into the waters of the lake.. Lake Cypress is located in the Kissimmee "chain of lakes" a series of lakes connected by man-made canals or by the Kissimmee River. The system is a popular fishing and recreational area. It also has been adversely affected by intense development and volumes of effluent flowing into the lakes. Cypress Lake has very poor water quality. Chlorophyll a consistently runs around 90-160 milligrams per liter (mg/1). DER has a policy of allowing no wasteload allocation if chlorophyll a is greater than 60 mg/1. Biochemical Oxygen Demand (BOD) is also extremely high. A BOD level of 2-3 mg/1 is deemed acceptable. Samples taken by Petitioner's consultants in December 1986, reflected a BOD level of 9.8 mg/l in the lake and 27 mg/1 in the borrow pit. Some violations, though not as serious, were found in the Dissolved Oxygen (DO) standard of 5 mg/1. The creation of a finger canal will create a more serious water quality problem than currently exists. This is evidenced by experiences with such canals throughout the state. Dead-end canals prohibit effective exchange of water and after a period of build-up within the basin, a winter storm event or unusually heavy summer thunder-shower will create a sloshing effect, the toxic plug will be released and the polluted water will flush into the lake, creating a potential fish kill. After a period of buildup, boaters are reluctant to use dead-end finger canals as it is impossible to keep the boats clean. The proposed channel dredging would eliminate approximately 0.25 acres of densely vegetated littoral zone habitat. Such zones provide spawning, nursery and feeding habitat for a wide variety of fish species. Lesser concerns, but nonetheless negative impacts from the project, are a short term increase in turbidity from the dredging of the channel, and the effect on endangered or threatened species of birds found on or near the site. The U.S. Department of the Interior, Fish and Wildlife Service and the U.S. Environmental Protection Agency have commented negatively on the proposed project. These agencies have cited the same concerns with water quality, effect on the littoral zone and effect on wildlife described above, and explained in depth in the testimony of DER's expert witnesses. The Florida Game and Fresh Water Fish Commission, also commenting on the project, has a policy of encouraging development and use of public access facilities and discouraging all private channel construction. On Lake Cypress there exists a public boat ramp and launching facility approximately 300 feet to the north of the proposed project. Other access to the lake is provided through facilities on other lakes in the chain, although these facilities are a considerable driving distance from the proposed site. The public boat ramp on Lake Cypress does not have lights nor restrooms. Parking is limited and Waldron provides parking for boaters at his commercial establishment for $7.00 a year. Carl Wagner presented six pages of signatures obtained from his posting a "Petition" in support of the project at his bait and tackle shop. The Petition cites deficiencies in the existing public facility. Carl Wagner has lived and worked on the Kissimmee chain of lakes for 37 years. He worked for the South Central Florida Flood Control District maintaining pumps and locks for eleven years, and has fished and served as a fishing guide for the remainder. He has an intimate familiarity with the wildlife, fish species, drift and flow of the lakes and weather patterns in the area. His knowledge is valid, though not so technical as that of the various agency experts. His position is that he is just trying to make a living, that if the public ramp and facilities were adequate, he could make a living with a tackle shop, but the public access is not adequate. He concedes that the water quality is bad, but argues that the impact of his project would be so minimal as to be a mere "drop in the bucket". While the applicant has not suggested alternatives, the Department has suggested that a boardwalk could be constructed with a dock extending into the lake, with finger piers. This would avoid the need to dredge a canal and channel, but the environmental impact of the pilings and any navigational hazards have not been fully studied. The applicant has not Suggested mitigation measures to improve water quality, nor is it likely that such measures would be effective.

Recommendation Based on the foregoing, it is hereby, RECOMMENDED: That a Final Order be entered denying permit application number 49-1241774. DONE and RECOMMENDED this 19th day of August, 1987 in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of August, 1987. COPIES FURNISHED: Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Grace L. Waldron Post Office Box 1341 St. Cloud, Florida 32769 Carl W. Wagner Post Office Box 975 KenanSville, Florida 32739 Vivian F. Garfein, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 3
RONALD T. HOPWOOD AND MILAN M. KNOR vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-000153 (1980)
Division of Administrative Hearings, Florida Number: 80-000153 Latest Update: Oct. 07, 1980

Findings Of Fact Petitioner Ronald T. Hopwood is president of Last Resort Fish Camp Association, Inc. (hereafter "Association"), the owner of Big Pine Island located in Lake County, Florida. Big Pine Island consists of approximately 26 acres of land above the mean high watermark and 166 acres of submerged and transitional zone lands. The Association's property is more accurately described by the Department's exhibit III, Map C. Petitioner Milan M. Knor submitted to the Department a dredge and fill permit application, File No. 35-20062-4E, to dredge 7,350 plus-or-minus cubic yards of fill material waterward of the lien of ordinary high water and adjacent to the Petitioner's uplands (Department's Exhibit 12). It is proposed that the fill material or spoil be deposited on the landward side of a perimeter canal which presently exists along the southwest one-third of the island. When the project is complete, the canal will encircle the entire island, the fill material resulting therefrom will be deposited on the island side of the perimeter canal below a 59.5-foot elevation (Department's Exhibit III, Map A). During the dredging, turbidity curtains would be utilized. As part of the project, Petitioners propose to install two (2) 42-inch diameter culverts at the east and west ends of a causeway which connects Big Pine Island to the mainland (Department's Exhibit III, Map B). The purposes of the proposed project are to improve the water quality of the adjacent canals and wetlands, provide fire protection, reduce algae blooms, and stabilize bottom sediments (Petitioners' Exhibit A, Department's Exhibit 1). The elevation of 59.5 feet above mean sea level was established by the St. John's River Water Management District as the ordinary high water elevation of Lake Griffin. The desirable levels of Lake Griffin vary between 58.07 and 59.38 feet. A dredge and fill permit was issued fro this project by the St. John's River Water Management District. In its final order granting the permit, the Governing Board of the District found, inter alia, that the water quality of the district would not be significantly diminished by the channelization of the marsh, that the new culverts would increase the rate of flow and the flushing of the marsh by providing increased northerly access for the water flow, that the excavation would enhance navigability and flow through the interior canal, and that the channelization would promote fire protection. The Board believed that the installation of the culvers ". . . will provide a positive benefit to the marshlands by correcting the prior damming effect of the causeway " (Petitioner's Exhibit D). The permit was issued by the Governing Board over the recommendation of its staff to deny the permit (Department's Exhibit 16). On July 26, 1979, Mr. James Morgan, a filed inspector with the Department, conducted an on-site field inspection of the proposed project. Mr. Morgan complied an appraisal report, Department's Exhibit 11, which evaluated the feasibility of extending the existing 1,200-foot canal by approximately 3,000 feet. Mr. Morgan found that a portion of the area to be excavated, approximately 600 feet, was previously cleared and vegetated by arrowhead (Sagittaria, Sp.), paragrass (Panicum purpurascens), bloodroot (Lacnanthes caroliniana) and sawgrass. 1/ Standing water was present in portions of the previously cleared area. The remaining 2,400 feet were in a natural state, dominated by willows (Tudwigia peruviana), wax myrtles (Myrica ceriferia), arrowhead and sawgrass. Surface waters of the Oklawaha River and Lake Griffin were present in part of this area; however, at the time of the field evaluation, Lake Griffin's surface waters were depressed by approximately six (6) inches below its established ordinary high water elevation. Raising the lake's elevation to its high water elevation, 59.5 feet, would result in the entire project site being inundated with surface waters. Dip net samples yielded organisms which constitute the lowest levels of an aquatic food chain including amphipods, dragonfly naiads, diptera larvae and mosquito fish. Mr. Morgan's report concluded that ". . . [d]ue to the severity of the anticipated impact of the proposed canal construction, no environmentally acceptable modification is available other than to permit the system to function naturally. . . ." This conclusion was based on the following negative aspects of the project. The collecting and storing of organic materials in the canal which would reduce the dissolved oxygen level during biodegradation to lethal levels for fish and other aquatic organisms; The physical alteration and elimination of a natural wetland community; The increase in turbidity during excavation; and The placement of spoil below the controlled elevation of Lake Griffin which would reduce the lake and river flood storage capacity as well as the area capable of supporting healthy aquatic plant and animal life. It was recommended that the proposed culverts be installed and that one canal- front lot be utilized as a common lot for all property owners, thereby providing open water access to all property owners. Lake Griffin is presently in a highly eutrophic stated caused by large amounts of algae growth and weeds in the water column. Agricultural farming, municipal sewage treatment plants, and citrus processing plants are among the sources of nutrients causing the high algae growth. The construction of the causeway between the mainland and Big Pine Island in 1958 has prevented virtually any water from circulating between the marsh area and canal south of the causeway and the marsh area and canal north of the causeway. Due to this blockage of flow, lower dissolved oxygen levels and lower temperatures exist on the north side of the causeway. The south canal helps to maintain oxygen levels in the south marsh above concentrations considered critical to maintain aquatic life. The presence of the causeway has reduced the outflow of Lake Griffin by half, thereby increasing the residence time in the lake and promoting nutrient level buildup in the system. By increasing the water flow through the marsh surrounding the island, the quality of water entering the Oklawaha River from eutrophic Lake Griffin should be greatly improved. The marsh to the north of the causeway presently serves a vital purpose by removing nutrients and other deleterious substances from the water flowing from Lake Griffin into the Oklawaha River. The marsh community acts in a matter similar to the human kidney by filtering deleterious substances from the surface water. Biological productivity of the north marsh area is directly proportional to the amount of flow. This area presently experiences water movement caused by the control of water elevations in the Oklawaha chain of lakes by a series of control structures. This "backwater" effect, which is caused by movement in the Oklawaha, is not a sheet flow. If a sheet flow could be created, the marsh area directly north of the causeway, which is severely distressed, could be improved. A sheet flow northward could be created by the proper placement of adequate size culverts under the causeway and the completion of the canal. The canal could facilitate the flow of water northward by permitting water to overflow the canal bank on the north side. This would be caused by the effects of a hydraulic gradient which exists between the water level in the canal and the ordinary mean high water lever maintained by the St. John's River Water Management District. The hydraulic gradient would cause the canal to overflow its unobstructed north bank and travel northward through the marsh into the Oklawaha River. Water would be blocked by overflowing on the southeast side of the island because of an existing berm. In order to restore circulation, it would also be necessary to construct a series of culverts evenly distributed under the causeway. The two- culvert system proposed by the Petitioners would have a cosmetic effect and not significantly improve the natural water flow between the canals. If the flow through the highly distressed marsh to the north of the causeway could be improved through the proper placement of culverts and construction of a perimeter canal, the positive aspects of the project would outweigh the negative impact of the elimination of approximately six (6) acres of productive marshland. If steps are not taken to reverse the continuing degradation of the marsh directly north of the causeway, a large and valuable area of wetlands will be lost. Artificial conditions already exist due to the finger canal on the north side of the causeway and the causeway itself. The proposed filling of the island which is to occur below the 59.5- foot elevation will reduce the river's flood storage capacity and the area capable of supporting plan and animal life. The private benefit of placing the spoil from the dredging project on the island below the 59.5-foot elevation is outweighed by the negative impact associated with the elimination of a significant amount of low lying marshland. Adequate alternative means exist to provide fire protection to the residents of the island, and the filling of outlying marshes on the island is not necessary to accomplish this purpose. Petitioners have not been denied the use of their property either by the Department's denial of this permit or the granting of this permit with conditions. The existing lots are suitable for residential purposes, including that portion of the island below the 59.5-foot elevation which may be used for residential development by placing housing on pilings or poles.

Recommendation Therefore, it is recommended that the Department issue a permit to Petitioners to complete construction of a perimeter canal surrounding Big Pine Island subject to the following conditions: That the applicants install culverts or other similar structures of appropriate size to facilitate an adequate exchange of water between the canals on the north and south sides of the causeway. The number and size of the culverts or other structures will be determined by the Department. That the fill or spoil resulting from the dredging of the canal not be placed on Big Pine Island or any surrounding property at any elevation below 59.5 feet in elevation. That the applicants utilize equipment including, but not limited to, turbidity curtains to keep turbidity at a minimum during the dredging process. DONE AND ORDERED this 25th day of August 1980, in Tallahassee, Leon County, Florida. SHARYN L. SMITH Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of August 1980.

Florida Laws (2) 120.57403.031
# 4
SAVE OUR CREEKS, INC. AND ENVIRONMENTAL CONFEDERATION OF SOUTHWEST FLORIDA, INC. vs FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 12-003427 (2012)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 18, 2012 Number: 12-003427 Latest Update: Jan. 15, 2014

The Issue The issue to be determined in this case is whether the Florida Fish and Wildlife Conservation Commission (“Commission”) is entitled to the requested minor modification of its existing Environmental Resource Permit and Sovereign Submerged Lands Authorization, which would authorize the backfilling of a portion of Fisheating Creek as part of a restoration project.

Findings Of Fact The Parties The Department is the state agency responsible for regulating construction activities in waters of the State. The Department has also been delegated authority to process and act on applications for authorization from the Board of Trustees for activities on sovereignty submerged lands. The Commission is the state wildlife management agency. The Commission is the applicant for the minor modification at issue in this proceeding. Petitioner, Save Our Creeks, Inc., is a non-profit Florida corporation with its offices in Lake Place, Florida. Save Our Creeks’ members are interested citizens and groups devoted to the conservation of natural resources, especially creeks and small waterways. Save Our Creeks owns property on Fisheating Creek in Glades County, approximately nine miles upstream of Cowbone Marsh. Petitioner, Environmental Confederation of Southwest Florida, Inc. (ECOSWF), is a non-profit Florida corporation with its offices in Sarasota, Florida. A substantial number of the members of Save Our Creeks and ECOSWF use and enjoy the waters of Fisheating Creek for a variety of purposes, including canoeing, boating, fishing, and wildlife observation. Their interests would be affected by the proposed project. Fisheating Creek and Cowbone Marsh Fisheating Creek flows from Highlands and Desoto Counties south and east through Glades County. The Creek runs in a northeastern direction through Cowbone Marsh before draining into Lake Okeechobee. The Creek contributes approximately nine percent of the flow into Lake Okeechobee. Fisheating Creek is designated as Class III waters. Cowbone Marsh is located about eight miles west of Lake Okeechobee. It is a mile and a half long and two miles wide, covering about 2,500 acres. Fisheating Creek and Cowbone Marsh are within the Fisheating Creek Wildlife Management Area. In 1929, the United States Army Corps of Engineers ("USACOE") prepared a survey map which shows Fisheating Creek as an open water route from Lake Okeechobee through Cowbone Marsh and continuing beyond. The accuracy of the course of the Creek as it is depicted in the 1929 map is not disputed by the parties. The 1929 map does not describe the depth or width of the Creek. Some evidence about historical widths and depths was presented, but it was incomplete. There was credible evidence showing that some segments of Fisheating Creek were four to five feet deep and 20 to 30 feet wide. There was also credible evidence that other segments of the Creek were shallower and narrower. The record shows only that canoes, kayaks, and other vessels drawing twelve inches of water or less have been used on the Creek. For a number of years, much of Fisheating Creek has been choked by vegetation and “tussocks.” Tussocks are floating mats of vegetation. Carolina willow now dominates Cowbone Marsh, having replaced areas that were previously open water or covered with herbaceous marsh communities. The vegetation in the Creek made navigation difficult or impossible through Cowbone Marsh. The 1998 Judgment and 1999 Settlement Agreement In 1989, Lykes Bros., Inc., asserted ownership of Fisheating Creek and tried to prevent public access to the Creek. The Board of Trustees responded with a civil action against Lykes Bros., seeking a determination that Fisheating Creek throughout Glades County is navigable and, consequently, the title to its bottom is held by the Board of Trustees as sovereignty submerged lands. Petitioners in this administrative proceeding intervened in the circuit court case on the side of the Board of Trustees. The jury found Fisheating Creek navigable throughout Glades County and the court entered a judgment in 1998 determining that the Creek is sovereignty land held in trust by the Board of Trustees. The judgment did not include any findings about the widths and depths of Fisheating Creek. The court retained jurisdiction to determine the boundaries of the Creek, but the boundaries were never determined. The circuit court case was appealed, but in May 1999, the parties entered into a settlement agreement pursuant to which Lykes Bros. agreed to sell to the Board of Trustees a conservation easement on upland areas adjacent to Fisheating Creek, to be held and managed for the benefit of the public. The conservation area is known as the Fisheating Creek Expanded Corridor. The settlement agreement also called for the Board of Trustees to lease the Fisheating Creek Expanded Corridor to the Commission, who the Board of Trustees designated as the managing agency. The settlement agreement acknowledges the public's "right to boat and canoe on Fisheating Creek throughout the entire Expanded Corridor.” With respect to navigation, the settlement agreement provides: Protection of Navigation. The navigability of Fisheating Creek throughout the entire Expanded Corridor shall be maintained and enhanced through a navigation maintenance program which includes aquatic weed control and removal of fallen logs and similar obstructions. This section does not authorize dredging. The Cookie-Cutter Project In January 2009, the Commission aerially applied an herbicide to kill the vegetation along the course of the Creek. In April 2010, the Commission contracted with A & L Aquatic Weed Control (“A & L”) to “[m]echanically dismantle floating tussocks.” The Commission directed A & L to perform the project by “shredding vegetation and accumulated organic material to re-open the navigation across Cowbone Marsh.” The Commission instructed A & L to re-open a channel "approximately 2.2 miles long and 18-20 feet wide,” and to clear some areas of the Creek “as wide as 35-feet wide occasionally as necessary to turn shredding equipment during the shredding process.” The Commission did not direct A & L to dredge a deeper channel. The vessel used by A & L to perform the work is known as a “cookie-cutter.” The cookie-cutter has two cutting wheels at the front of the vessel to shred and side-cast vegetation. The cutting wheels also act as propellers to propel the cookie- cutter forward. The cookie-cutter can clear woody vegetation up to four inches in diameter. The two cutting wheels can be lowered or raised in order to cut vegetation at various depths in the water. Evidence was presented to show how the cutting wheels could be lowered two to three feet, but it was not made clear whether the cutting wheels could be lowered even more. No evidence was presented to establish how deep the cookie-cutter blades were lowered into Fisheating Creek during the work performed by A & L. No evidence was presented to establish what depth of soil the cookie-cutter was capable of dredging through if the cutting wheels cut into the Creek bottom. The cookie-cutter began on the eastern side of Cowbone Marsh and moved upstream. The parties disputed the point of beginning. Petitioners contend it was farther upstream, but the more persuasive evidence for the point of beginning was presented by the Commission. The cookie-cutter generally followed the course of Fisheating Creek as depicted on the 1929 USACOE map. However, there are three areas where the cookie-cutter deviated from the 1929 map. One deviation is about 100 feet off-line. The other two deviations are 25 to 30 feet off-line. No explanation was given for the deviations, but the cookie-cutter operator generally followed the path of dead vegetation killed by the aerial spraying of herbicide and the line may have deviated from the true course of the Creek in these three areas. During the cookie-cutter project, water levels within the Creek and Marsh fluctuated. At some point, the project was postponed due to low water conditions. A sandbag dam was placed in the channel to artificially raise the water level so the cookie-cutter could continue. In July 2010, the Department and USACOE ordered the Commission to stop the project due to its adverse environmental impacts, including the draining of Cowbone Marsh. Before the cookie-cutter stopped, it had cleared about two miles of Fisheating Creek. Where the cookie-cutter stopped there is a discernible channel continuing west, but it is shallower and narrower than the channel created by the cookie-cutter. At this terminus, the cookie-cutter was dredging a deeper and wider channel than existed naturally. Additional evidence of dredging along the Creek channel is the soil cast up on the banks, and the removal of peat soils in the bottom of the Creek and exposure of underlying mineralized soil. The cookie-cutter altered the natural conditions of the Fisheating Creek in some areas by dredging the sides and bottom of the Creek. The dredging by the cookie-cutter altered the hydrology of the Creek and Marsh. The Marsh drained rapidly to Lake Okeechobee. In addition, large quantities of soil, muck, silt, and debris disturbed by the cookie-cutter were carried downstream toward Lake Okeechobee. Some of the soil and debris settled out at the mouth of the Creek, causing shoaling. The sides of the channel in many areas is continuing to erode. The Department’s Emergency Final Order In July 2010, the Department issued an Emergency Final Order, which directed the Commission to: (a) remove the cookie- cutter and immediately stop all activities associated with the cookie-cutter; (b) place temporary emergency flow restrictors in the channel to reduce flow velocities and minimize downstream sediment transport, as well as raise the water level to minimize surface and groundwater flow from the adjacent marsh into the channel; and (c) develop a long-term remedial plan to return water levels within the Marsh to pre-impact conditions and apply to the Department for an Environmental Resource Permit to implement the plan. In August 2010, pursuant to the Emergency Final Order, the Commission constructed an aluminum weir in the Creek to decrease flow velocities, reduce erosion, and maintain the hydration of the Marsh. The weir was placed approximately half a mile downstream from where the cookie-cutter stopped. During the wet season of 2010, the aluminum weir was completely submerged. Erosion and shoaling occurred immediately downstream. The Commission determined that the weir was ineffective and removed it. The EPA Compliance Orders In March 2011, the EPA issued an Administrative Compliance Order in which it alleged the Commission had engaged in "unauthorized activities associated with the excavation and construction of a channel within Cowbone Marsh.” The Commission was ordered to construct an initial check dam in the upper reaches of the Marsh to minimize the loss of groundwater and prevent further adverse impacts. In April 2011, EPA issued a second Administrative Compliance Order, directing the Commission to construct five additional check dams. The order describes the check dams as "initial corrective measures" and states that the “final restoration plan will include measures for backfilling the unauthorized cut through Cowbone Marsh.” The Initial Permits In May 2011, the Department issued to the Commission an Environmental Resource Permit and Sovereign Submerged Lands Authorization, which authorized the construction of six earthen check-dams within the portion of Fisheating Creek where the cookie-cutter had operated. The purpose of the check dams was to improve the hydrology of Cowbone Marsh and promote the accumulation of sediments within the channel to restore the natural depth and width of Fisheating Creek. The check dams were constructed using sand bags, marine plywood, coconut matting, and pressure-treated posts. The check dams have ten-foot wing walls which extend into the surrounding marsh. The wing walls are to prevent erosion around the dams and to direct water into the marsh. The installation of the check dams was completed in July 2011. Since that time, some repair efforts have been required to replace lost sandbags and to address erosion that has occurred around the check dams. The check dams have been somewhat successful in maintaining higher water levels in the Marsh. However, they have not restored natural hydrologic conditions, or prevented erosion along the channel. The Proposed Modification In June 2012, the Commission applied for a "minor modification" to the existing permits, which the Department granted. The modified permits authorize the Commission to backfill the channel cleared by the cookie-cutter with approximately 27,000 cubic yards of sand. The check dams would not be removed. The sand for the backfilling would be excavated from a "borrow" area located about a mile away. Petitioners contend that the borrow area is in wetlands, but the more persuasive evidence is that it is uplands. A 1.164-mile temporary access road would be constructed from the borrow area through uplands and wetlands to a 100-square-foot staging area adjacent to Fisheating Creek where the backfilling would begin. Wetland impacts would be minimized by constructing the temporary access road and staging area with interlocking mats. Petitioners did not show that the route or manner in which the temporary road would be constructed and used would have unacceptable adverse impacts to the environment or otherwise fail to comply with applicable criteria. The sand would be dumped into the Creek and then compacted. As the Creek was filled, the compacted sand would be used as a roadway for the trucks to transport sand to the end of the filled area to dump more sand, until the backfilling was completed. The proposed backfilling would not restore a typical stream profile, deepest in the middle and becoming more and more shallow moving toward the banks. That kind of profile can be seen in the photographs of Fisheating Creek taken before the cookie-cutter project. The proposed modification calls for filling the cut channel from "bank to bank": Final Grade: Fill must be compacted and ground surface elevations must be the same as the adjacent marsh ground surface elevations (within a tolerance of +6/-6 inches) The filled channel would be seeded and fertilized to grow native vegetation. The proposed seed mixture is mostly water grasses, but has some willow included. Compliance with Criteria Florida Administrative Code Rule 62-343.100 provides that a modification is treated as either minor or major depending on the magnitude of the changes and the potential for environmental impacts that differ from those addressed in the original permit: modification shall be considered to be minor only where the modification does not: Require a new site inspection by the Department in order to evaluate the request; or Substantially: Alter permit conditions; Increase the authorized discharge; Have substantially different or increased impacts on wetlands and other surface waters. . . ; Decrease the retention/detention specified by the original permit; Decrease any flood control elevations for roads or buildings specified by the original permit; or Increase the project area. At the final hearing, it was not shown how the modification meets the criteria for a minor modification. The proposed modification does not meet the criteria because it required new site visits, substantially alters the original permit conditions, and has a substantially different impact on wetlands. The criteria applicable to an application for a major modification were not identified, nor was it shown how the evidence presented at the final hearing satisfies the requirements for such an application. The proposed backfilling plan would not restore the natural conditions that existed in Fisheating Creek. The Commission did not show that it made a reasonable effort to determine the pre-disturbance conditions throughout the disturbed area. The proposed modification would not restore the natural depths in the Creek. The backfilling plan calls for a finished grade of plus or minus six inches above the level of the adjacent marsh. A final grade of zero to plus six inches would essentially eliminate Fisheating Creek. The maximum allowed depth of minus six inches below the level of the adjacent marsh would be shallower than the natural depths in portions of the Creek. Even the Department described the Creek was "one to two feet deep" before the cookie-cutter project. Adequate measures are not included in the permits to ensure that after backfilling and planting, the Creek would have the ordinary attributes of a creek. The proposed modification would not restore the pre- existing hydrologic conditions of the Creek. The modified Environmental Resource Permit requires strict compliance with the terms of the 1999 settlement agreement. The modification would not be consistent with the 1999 settlement agreement because the backfilling and planting would destroy the navigability of the Creek. Petitioners want to preserve the current depths of Fisheating Creek, but some of those depths are unnatural, being the result of dredging by the cookie-cutter. However, the proposed backfilling would not restore the natural depths in some parts of the Creek and would not maintain the navigability of the Creek, even for shallow draft vessels such as canoes and kayaks.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that the Department deny the requested modification to the Commission's Environmental Resource Permit and Sovereignty Submerged Lands Authorization. DONE AND ENTERED this 3rd day of July, 2013, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 3rd day of July, 2013. COPIES FURNISHED: W. Douglas Beason, Esquire Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Alisa A. Coe, Esquire Joshua D. Smith, Esquire Bradley I. B. Marshall, Esquire Earthjustice 111 South Martin Luther King, Jr., Boulevard Tallahassee, Florida 32301 Harold "Bud" Viehauer, General Counsel Ryan Osborne, Esquire Florida Fish and Wildlife Conservation Commission Bryant Building 620 South Meridian Street Tallahassee, Florida 32399-1050 Herschel T. Vinyard, Jr., Secretary Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Matthew Z. Leopold, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Lea Crandall, Agency Clerk Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (5) 120.52120.569120.57267.061373.414 Florida Administrative Code (3) 18-21.00418-21.005162-343.100
# 5
DAVID E. MUSSELMAN vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-001352 (1992)
Division of Administrative Hearings, Florida Filed:Key West, Florida Feb. 28, 1992 Number: 92-001352 Latest Update: Jul. 13, 1992

Findings Of Fact Background Petitioner, David E. Musselman, is the owner of Lot 23, Block 22, Cudjoe Gardens Eighth Addition, Cudjoe Key, Monroe County, Florida. The lot measures 127 feet along its front and rear property line, 135 feet along its side property lines and, similar to adjacent lots, its rear property line abuts an artificially created waterway. Currently, most of petitioner's lot enjoys an elevation of six feet; however, from the edge of the waterway landward a distance of approximately 20 feet [to what has been referred to as the "toe of the existing slope" in these proceedings] the surface consists of exposed caprock at an elevation of approximately four inches above mean high water. It is petitioner's desire to construct a single family residence upon such lot and, incident to such construction, to erect a seawall along the edge of the waterway such that the elevation at the waterway will be increased by two feet, and to backfill from the seawall to his home. Such backfilling would require the deposition of approximately 3,540 square feet of fill within the Department's jurisdiction, which was shown to extend from the edge of the waterway to the toe of the existing slope, and would raise the elevation in such area two feet above existing grade. On December 16, 1991, petitioner filed an application with respondent, Department of Environmental Regulation (Department), for an exemption from the Department's wetland permitting requirements. If approved, such exemption would allow petitioner to construct the vertical seawall along the waterway, and backfill from the seawall to his proposed home. By notice of agency action dated February 14, 1992, the Department proposed to deny petitioner's application predicated on its conclusion that his proposal did not meet the exemption criteria established by Rule 17- 312.050(1)(g), Florida Administrative Code. Petitioner filed a timely protest to contest the Department's conclusion. The exemption Pertinent to this case, Rule 17-312.050(1)(g), Florida Administrative Code, exempts from permitting the following activities: (g) Construction of seawalls or riprap, including only that backfilling needed to level the land behind the seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control. An artificially created waterway shall be defined as a body of water that has been totally dredged or excavated and which does not overlap natural surface waters of the state. For the purpose of this exemption, artificially created waterways shall also include existing residential canal systems . . . . At hearing, the parties stipulated that the waterway which abuts the rear property line of petitioner's lot is an artificially created waterway, as well as an existing residential canal, and that the proposed project will not violate existing water quality standards, impede navigation, or adversely affect flood control. Notwithstanding, the Department contends that petitioner's application should be denied because no need has been demonstrated that would support the construction of the seawall along the edge of the waterway, as opposed to locating it further inland, and therefore the amount of backfill, with its attendant loss of wetlands, is excessive. For the reasons set forth in the conclusions of law, the Department's position is untenable as a matter of law. 1/

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department enter a final order approving petitioner's application for an exemption to construct a seawall, and to backfill from such seawall to his proposed home, as applied for. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 4th day of June 1992. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of June 1992.

Florida Laws (2) 120.57403.813
# 6
RONALD E. DOWDY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-000219 (1979)
Division of Administrative Hearings, Florida Number: 79-000219 Latest Update: Sep. 04, 1979

Findings Of Fact Based on the testimony of the witnesses and their demeanor while testifying, the documentary evidence introduced, the proposed findings of facts and recommended orders filed by the parties' counsel, and the arguments and citations of authority cited therein, the following relevant facts are found. 1/ This action concerns a parcel of land owned by Ronald E. Dowdy and his wife, Mary Ellen Dowdy, located at 7630 Lake Marsha Drive, Orlando, Florida. The Department does not claim, other than regulatory authority, ownership to the land in question. On March 15, 1978, Petitioner submitted to the Department a dredging and fill permit application, file No. 48-8093-4E., to deposit 200 cubic yards of fill material waterward of the line of ordinary high water, adjacent to Petitioner's upland property on Lake Marsha. The area proposed to be filled measured 150 feet along the shoreline, 55 feet between the line of ordinary high water and ordinary low water, and 12 inches deep. (Petitioner's Exhibit 2; D.E.R. Exhibit 9.) On June 15, 1978, the Department gave notice of its intent to deny Petitioner's permit application, stating with particularity the specific ground on which the denial was based and allowing Petitioner fourteen (14) days in which to petition for a hearing on the denial. Within thirty (30) days of the filing of the petitioner's application, he was advised that clearance and/or approval was necessary from the Department of Natural Resources. A Final Order denying application for permit was issued June 23, 1978. Petitioner did not file a petition pursuant to Chapter 120, Florida Statutes, seeking review of either the intent to deny letter or the Final Order until January 15, 1979. The Department waived the time requirement for filing the petition. On or about August 3, 1978, Petitioner caused to be deposited large quantities of fill in excess of the 200 cubic yards applied for along approximately 380 feet of shoreline between the line of ordinary high water and ordinary low water adjacent to his upland property. (Petitioner's Exhibit 2 and D.E.R. Exhibits 1 and 2.) Although Petitioner did not obtain a permit from the Department prior to commencement of the fill work described above, Orange County issued a permit (see Petitioner's Exhibit 2) which specified that the Department permit would have to be obtained prior to commencement of the fill work. The county permitted the Petitioner to fill an area along 150 feet of shoreline while the petitioner filled the entire length of the shoreline, i.e., 380 feet. As of the hearing date, Petitioner had not filed an application for a permit from either the county or the Department for the excess fill. Prior to the time that the Petitioner undertook the filling project, he met with employees of the Department who advised that a permit would be necessary prior to commencing the fill work. Department employees suggested that the State would look favorably on a reduced fill project of somewhere between 50 to 75 feet along the lake shoreline. (D.E.R. Exhibit 8.) The bulk of the fill area as completed, lies below the ordinary high water line of Lake Marsha, i.e., below the elevation line of 127 feet. (Petitioner's Exhibit 2.) Mr. Robert Day, a pollution control specialist employed by the Department as an enforcement investigator, observed the filling activity as it was taking place from the movement of fill by bulldozer to the sodding of the newly created fill area. (D.E.R. Exhibits 1 and 2.) Upon discovery of the Petitioner's filling activity without a permit, the Department attempted to notify him of the violation by means of a warning notice sent by U.S. Mail, certified, return receipt requested, which Petitioner did not claim. The Department thereafter sent Petitioner a telegram which resulted in a meeting in the Department's office in Orlando. (D.E.R. Exhibits 3, 4 and 5.) Richard Hoffman, district conservationist with the U.S. Department of Agriculture, Soil Conservation Service, was qualified as an expert in the collection and identification of soil core samples. Mr. Hoffman testified at length on a series of core samples taken on the Dowdy property confirming the fact that the Petitioner had placed fill on vegetated muck and that all but one of the core samples were below the high water line. (Petitioner's Exhibit 2 and D.E.R. Exhibit 7.) James Morgan, an environmental specialist of the Department, was qualified as an expert witness in the processing and appraisal of dredge and fill permit applications and their impact on water quality and wetlands ecology. Mr. Morgan advised the Petitioner on February 14, 1978, several months before the actual filling activity, that it was necessary to obtain a permit from the Department pursuant to Chapter 17-4, Florida Administrative Cede. Again, on March 16, 1978, at a meeting with Petitioner, Mr. Morgan advised the Petitioner of the necessity to obtain a permit before any filling was done. Additionally, he advised and suggested to Petitioner that with respect to his proposed activity, the Department would look favorably upon a modified application requiring a fill area of 50 to 75 feet of the lake's shoreline. Upon receipt of Petitioner's application, Mr. Morgan conducted a permit application appraisal (D.E.R. Exhibit 9) and found that the area proposed to be filled contained deep muck deposits and was dominated by the vegetation, maidencane, with a lesser abundance of arrowhead, pickeral weed and pennywort. The dominant species was maidencane, which along with arrowhead and pickeral weed, are species found in the vegetative index for submerged lands as set forth in Section 17-4.02(17), Florida Administrative Code. (See D.E.R. Exhibits 9 and 10.) Approximately 50 percent of the shoreline of Lake Marsha has been developed with the consequent elimination of marsh and wetland vegetation fringes of the lake. The aquatic vegetation found on the Dowdy property prior to filling performed functions of assimilating nutrients and filling deleterious substances from the waters of Lake Marsha and provided wildlife habitat. This assimilation process enabled and assisted the shoreline plants ability to absorb water containing dissolved pollutant substances which are utilized for plant food. The aquatic vegetation also filters suspended solids from the lake water. This assimilation and filtration process helps preserve water quality in a fresh water lake by both filtering runoff from the upland and cleansing the water of substances found in the water body itself. (D.E.R. Exhibit 9.) This process is commonly referred to as the "kidney effect". The fill which has been placed in the submerged land aquatic community will, as testified by the Department's witnesses, totally eliminate portions of the kidney of Lake Marsha and has been replaced with sod which carries the potential for causing further pollution of the waters of Lake Marsha. Testimony reveals that the fill will increase the nutrient load in the lake and dramatically decrease its ability to cope with the increased load. It is predicted by the Department's witnesses that the impact of the fill on the water quality of the lake will be significant as a substantial portion of the lake's littoral zone has been substantially eliminated. This, according to witness Morgan, can lead to the eutrophication of Lake Marsha end a resultant lower equilibrium based on poor water quality. (D.E.R. Exhibit 11.) According to Morgan, the parameters which are expected to be violated by the fill and the resultant elimination of a submerged land aquatic plant community include phosphorous and nitrogen which are classified as nutrients under Section 17-3.061(2)(i), Florida Administrative Code, and turbidity, under Section 17-3.061(2)(g) Florida Administrative Code. (D.E.R. Exhibit 9, part 2.) Testimony reveals that a correlation exists between the degree of shoreline development of Central Florida lakes and the water quality of such lakes. This correlation is direct and reveals that the greater the degree of shoreline development, the greater the reduction of the lake's ability to compensate for nutrient load going into the lake and, thus, lower water quality. (Testimony of Morgan and Hulbert, T.R. pp 138-139; 177-180.) Witness Morgan testified that by restoration of the Petitioner's fill site to its original contours and elevation, the aquatic vegetation which once thrived on the site will reestablish itself and the consequent restoration of the lake's "kidney effect". James Hulbert, a Department District Biologist qualified as an expert in the area of water pollution biology and wetlands ecology, confirmed witness Morgan's testimony regarding the impact of water quality based on Petitioner's filling, the value of the wetland vegetational community which was, according to him, destroyed by the filling, including protection of uplands and its role as a source of food and shelter for the lake's aquatic life. Witness Hulbert also confirmed the testimony of witness Morgan to the effect that a direct correlation exists between the degree of shoreline development in central Florida lakes and the lowering of water quality in such lakes. Witness Hulbert testified further that submerged lands such as the ones filled by Petitioner assimilate nutrients for preserving fisheries of fresh water lakes. Mr. Hulbert also testified that dissolved oxygen levels are expected to be degraded with severe fluctuations which would result in the dissolved oxygen levels of as low as 0.0, below the standards of Chapter 17-3, Florida Administrative Code. This increased nutrient load will, according to Mr. Hulbert, result in proliferation of such existing exotic plant species such as hydrilla and water hyacinths, and an acceleration of the lake's eutrophication. Mr. Hulbert summarized the long- range impact of the fill as both measurable and substantial and concluded that the degradation process will be steady and gradual. Robert Bell, a real estate appraiser licensed in the State of Florida as a broker, indicates that there are other valuable uses of Petitioner's property other than filling the entire shoreline. Such uses, according to Bell, include the construction of a boardwalk, a deck, gazebo, a boat house, and even partial filling of the shoreline area for access to the water. The Department incurred expenses and costs in preparation of this proceeding for purposes of tracing, controlling, and abating the pollution sources created by the Petitioner's dredge and fill activities in the amount of $201.88. (D.E.R. Exhibits 14 and 15.)

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby

Florida Laws (5) 120.57403.031403.121403.141403.161
# 7
ALLIGATOR LAKE CHAIN HOMEOWNERS ASSOCIATION vs. MELVIN AND MARY THAYER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 84-004491 (1984)
Division of Administrative Hearings, Florida Number: 84-004491 Latest Update: Jan. 15, 1986

Findings Of Fact The Applicant/Respondents, Melvin and Mary Thayer have applied to the Department of Environmental Regulation (Department) for a "dredge and fill permit" seeking authorization to remove an existing 32-foot wooden fence and install in its place a chain-link fence, which as originally applied for would not extend more than 32 feet waterward from the 64-foot mean sea level elevation of Alligator Lake as marked by the waterward end of the existing wooden fence. The fence proposed would be five feet high and would possess a gate at its landward end which would permit pedestrian passage in both directions around the near-shore area of the lake. The project site is located approximately 400 feet south of U.S. 441-192 and adjacent to Alligator Lake, lying one mile west from Bay Lake within Section 10, Township 26 South, Range 31 East in Osceola County, Florida. As clarified and amended prior to hearing, the application now requests the permit to authorize, instead, a 26-foot fence extending that distance waterward from the 64-foot mean sea level elevation. The Department has permitting jurisdiction under Chapters 253 and 403, Florida Statutes as well as Chapter 17-4, Florida Administrative Code. There is no dispute that the Department has jurisdiction of the permitting of the subject fence inasmuch as the fence would be constructed waterward of the 64-foot mean sea level elevation or the "high pool" level of Alligator Lake in Class III waters of the state. Additionally, the area of the project waterward of the 64- foot mean sea level elevation lies on sovereign lands of the State of Florida under the jurisdiction of the Department of Natural Resources. That Department, as yet, has not issued a permit for use of sovereign land for the intended purpose as envisioned by Section 253.77, Florida Statutes. Ed Edmunson was tendered by both Respondents as an expert witness and was accepted as to his expertise in biological assessment of dredge and fill construction projects. It was thus established that the construction and installation of the fence and removal of the existing fence would cause no Class III water quality violations. Additionally, it was established that no navigational impediment would result from the fence as presently proposed which only involves a 26-foot fence extending from the 64-foot mean sea level elevation waterward in a perpendicular direction from the shore and near-shore of Alligator Lake. Parenthetically it should be noted that the original proposal involved extending the fence 32-feet waterward and then installing a right angle section parallel to the shoreline for an indeterminate distance. The right angle portion of the fence has been deleted from the permit application and the portion perpendicular to the shoreline has been amended from 32 feet down to 26 feet from the 64-foot mean sea level elevation. In that connection, it was established by witness Walter, accepted as an expert in the field of engineering, that on January 7, 1985, the water line of Alligator Lake was at 62.4 feet mean sea level elevation and the end of the existing 32-foot wooden fence was 16 feet from the then existing waterline of the lake. If the water in the lake was at the 64 feet mean sea level elevation or "high pool" stage, which has occurred on the average of once every three years, the water at the end of the fence would still be only .9 feet in depth at the waterward extreme end of the proposed 26-foot fence. Indeed, it was established with- out contradiction by the Applicant, Melvin Thayer, that in the 17 or 18 years he has observed the project site, that only "seven or eight inches of water is the most depth he has seen at the end of the fence." Thus, the fence as proposed to be installed, will pose no impediment or hazard to the navigation of fishing boats, skiing boats or other craft, and, in that regard, a dock in close proximity to the site of the proposed fence extends approximately 90 feet waterward at the present time. In view of the Petitioner's other objection to the fence concerning their feared loss of access to walk around the near-shore area of the lake to visit friends and the like, the permit applicants have agreed to install a gate for public access anywhere specified by the Department along the extent of the proposed fence. The testimony of Petitioner's witnesses, including a representative of the Game and Fresh Water Fish Commission, consists largely of objections to the precedent of permitting a private fence to be constructed in the waters of the state and on state water bodies, but no impediment to navigation has been established especially since the neighboring dock and numerous other docks around the shoreline of the lake extend waterward much farther than will the proposed fence. No degradation to water quality has been established to result from the proposed project. The fence has not been shown to be contrary to the public interest since it will not interfere with wildlife habitat or natural resources, nor impede navigation in any way, and was shown not to impede any public use of the lake or the near-shore area of the lake, in view of the access gate to be provided in the fence. In short, reasonable assurances have been provided that all permitting criteria within the Department's jurisdiction at issue in this proceeding will be complied with, although a permit from the Department of Natural Resources authorizing use of the state lands involved has not been issued as yet.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the application of Melvin and Mary Thayer for authority to remove an existing fence and to install a fence extending 26 feet waterward of the 64-foot mean sea level elevation of Alligator Lake with an attendant public access gate installed therein be GRANTED upon satisfaction of the above-stated condition. DONE and ENTERED this 15th day of January, 1986 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of January, 1986. COPIES FURNISHED: Virginia M. Hoover, MSM Consultant 5366 East Space Coast Parkway St. Cloud, Florida 32769 Norman J. Smith, Esquire Post Office Drawer 1549 Kissimmee, Florida 32741 B. J. Owens, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57253.77403.0876.10
# 8
ROSS GWIN vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-000594 (1985)
Division of Administrative Hearings, Florida Number: 85-000594 Latest Update: Jul. 03, 1985

Findings Of Fact By application dated August 28, 1984, Petitioner sought a permit from Respondent to deepen an existing ditch on his property from a current depth of one and a half feet to a proposed depth of three feet. The ditch is eight feet wide and eight hundred and fifty feet long and extends through a wetlands area to Lake Tohopekaliga which has been classified as a Class III waterbody. Petitioner intends to dredge approximately 377 cubic yards of material waterward of the ordinary high water elevation in order to make the existing storm drainage ditch navigable. This application was received by Respondent on September 11, 1984, and was accepted as complete on November 6, 1984. On January 9, 1985, an on-site inspection was concluded by Barbara Bess supervisor of dredge and fill permitting in Respondent's Orlando district office, who thereafter prepared an appraisal report dated January 23, 1985. As expressed in her report, Bess' primary concern with this application was the potential loss of fish and wildlife habitat which would result from the loss of grasses and macro-invertebrates resulting from the proposed project. Lake Tohopekaliga is a very popular and productive sportfishing lake, and the cumulative effect of such dredging activity, if it occurred around the lake would have a severely negative impact on the lake's food chain. This would in turn have adverse consequences for sportfishing and the water quality of the lake. Since similar drainage ditches do exist around the entire lake, there is a reasonable likelihood of similar projects occurring if this one is approved. Petitioner proposes that his dredging take place during a draw-down of Lake Tohopekaliga which has already been planned, and contends that the negative impact of the proposed deepening will be minimized since the ditch will be substantially dry during the draw-down. Petitioner's contention, however, is not supported by the evidence. Testimony from Barbara Bess, who was accepted as an expert on water quality standards and the biological impact of construction projects on water quality, and testimony from Ed Moyer, fisheries biologist with the Game and Fresh Water Fish Commission, established that Petitioner's ditch may not be completely dry during the draw-down, and that the proposed deepening will increase boat traffic due to the ditch's navigability, thereby reducing vegetation and harming the food chain in the immediate area of the ditch. The cumulative effect of similar projects occurring, even during the draw-down, will be negative for sportfishing and the water quality of the lake. Respondent issued its Intent to Deny on January 25,1985, in response to which Petitioner timely sought a hearing. The parties were allowed to submit proposed findings of fact and conclusions of law pursuant to Section 120.57(1)(b)4, F.S. A ruling on each proposed finding has been made either directly or indirectly in this Recommended Order, except where such proposed findings of fact have been rejected as subordinate, cumulative, immaterial, or unnecessary.

Recommendation Based on the foregoing, it is recommended that Respondent enter a Final Order denying Petitioner's permit application. DONE and ENTERED this 23rd day of May, 1985, at Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of May, 1985. COPIES FURNISHED: Ross Gwin 1731 Juniper Circle St. Cloud, Florida 32769 Ron Cray 1731 Juniper Circle St. Cloud, Florida 32769 B. J. Owens, Esquire Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blairstone Road Tallahassee, Florida 32301

Florida Laws (1) 120.57
# 9
COUNCIL OF CIVIC ASSOCIATION, INC. vs KORESHAN UNITY FOUNDATION, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-000999 (1998)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Mar. 03, 1998 Number: 98-000999 Latest Update: Sep. 17, 1998

The Issue The issue is whether Respondent Koreshan Unity Foundation, Inc., is entitled to a environmental resource permit for the construction of a wooden footbridge over the Estero River east of U.S. Route 41 and authorization to obtain by easement a right to use sovereign submerged lands.

Findings Of Fact Respondent Koreshan Unity Foundation, Inc. (Koreshan) is a not-for-profit corporation dedicated to the preservation of the Koreshan heritage. Koreshan derives its heritage from a largely self-sufficient community that occupied land in south Lee County. For several years, Koreshan has owned a parcel of 14.56 acres at the southeast corner of U.S. Route 41 and the Estero River. This parcel is bounded on the south by Corkscrew Road and contains an amphitheater and historical house, midway between the river and Corkscrew Road. The south end of this parcel contains a museum and parking area with access to Corkscrew Road. The approximate dimensions of the 14.56-acre parcel are 544 feet along the river, 496 feet along Corkscrew Road, and about 1273 feet along the west and the east property lines. The west property line is U.S. Route 41. The right-of-way for U.S. Route 41 is wider at the southern two-thirds of the parcel than the northern one-third of the parcel. A sidewalk runs on the east side of U.S. Route 41 from north of the river, across the U.S. Route 41 bridge, along the west boundary of Koreshan's property, at least to an entrance near the middle of the 14.56-acre parcel. In October 1996, Koreshan acquired 8.5 acres of land at the northeast corner of the U.S. Route 41 and the river. The purpose of the acquisition was to provide parking for persons coming to Koreshan-sponsored events, such as music performances, at the 14.56-acre site. Koreshan rents a small portion of this northerly parcel to a canoe-rental business, which operates where the bridge and river meet. To assist their visitors-some of whom are elderly and disabled--in gaining access to the 14.56-acre site, on November 26, 1996, Koreshan filed an application for a permit and authorization to construct a wooden footbridge across the Estero River about 315 feet east of the U.S. Route 41 bridge. The source of the Estero River is to the east of the U.S. Route 41 bridge and the location of the proposed bridge. After passing under the U.S. Route 41 bridge, the river runs along the Koreshan state park, which is a short distance east of U.S. Route 41, before it empties into the Gulf of Mexico at Estero Bay, which is a state aquatic preserve. The portion of the river at the site of the proposed bridge is an Outstanding Florida Waterway (OFW) and a Class III water. The river is popular with canoeists and kayakers. Persons may rent canoes and kayaks at the canoe rental business operating on the 8.5-acre parcel or the Koreshan state park. Although most canoeists and kayakers proceed downstream toward the bay, a significant number go upstream past the U.S. Route 41 bridge. Upstream of the bridge, the river narrows considerably. Tidal currents reach upstream of the U.S. Route 41 bridge. At certain tides or in strong winds, navigating a canoe or kayak in this area of the river can be moderately difficult. Even experienced canoeists or kayakers may have trouble maintaining a steady course in this part of the river. Less experienced canoeists or kayakers more often have trouble staying on course and avoiding other boats, the shore, vegetation extending from the water or shoreline, or even the relatively widely spaced supports of the U.S. Route 41 bridge pilings, which are about 30 feet apart. Mean high water is at 1.11 feet National Geodetic Vertical Datum. The deck of the proposed footbridge would be 9 feet, 6 inches wide from rail to rail and 16 feet wide in total. The proposed footbridge would extend about 180 feet, spanning 84 feet of water from shore to shore. The bridge- ends would each be about 50 feet and would each slope at a rate of 1:12. The proposed footbridge would rest on nine pilings: four in the uplands and five in the submerged bottom. The elevation of the bottom of the footbridge from the water surface, at mean high water, would be 8 feet, 8 inches. The distance between the centers of the pilings would be 14 feet, and each piling would be of a minimum diameter of 8 inches. According to a special permit condition, the pilings would be treated with chromated copper arsenate, as a preservative, but they would be wrapped in impermeable plastic or PVC sleeves so as, in the words of the proposed permit, "to reduce the leaching of deleterious substances from the pilings." The proposed permit requires that the sleeves shall be installed from at least 6 inches below the level of the substrate to at least 1 foot above the seasonal highwater line and shall be maintained over the life of the facility. The proposed permit also requires that the footbridge be limited to pedestrian traffic only, except for wheelchairs. The permit requires the applicant to install concrete-filled steel posts adjacent to the bridge to prevent vehicles from using the bridge. The proposed permit requires that Koreshan grant a conservation easement for the entire riverbank running along both shorelines of Koreshan's two parcels, except for the dock and boat ramp used by the canoe-rental business. The proposed permit also requires Koreshan to plant leather fern or other wetland species on three-foot centers along the river banks along both banks for a distance of 30 feet. The proposed permit states that the project shall comply with all applicable water quality standards, including the antidegradation permitting requirements of Rule 62-4.242, Florida Administrative Code. Respondents did not raise standing as an affirmative defense. It appears that Petitioners or, in the case of corporate Petitioners, members and officers all live in the area of the Estero River and use the river regularly. For instance, Petitioner Dorothy McNeill resides one mile south of the proposed bridge on a canal leading to the Estero River, which she uses frequently. She is the president and treasurer of Petitioner Estero Conservancy, whose mission is to preserve the Estero River in its natural state. Petitioner Ellen W. Peterson resides on Corkscrew Road, 300-400 feet from the proposed footbridge. For 26 years, she has paddled the river several times weekly, usually upstream because it is prettier. She formerly canoed, but now kayaks. The record is devoid of evidence of the water- quality criteria for the Estero River at the time of its designation as an OFW or 1995, which is the year prior to the subject application. Koreshan has not provided reasonable assurance that the proposed footbridge would not adversely affect the water quality of the Estero River. Although the site of the proposed footbridge is devoid of bottom vegetation and there is no suggestion that this is anything but a natural condition for this part of the riverbottom, there is evidence that the proposed footbridge would adversely affect the water quality in two respects: turbidity caused by the pilings and leaching from the chromated copper arsenate applied to the pilings. The turbidity is probably the greater threat to water quality because it would be a permanent factor commencing with the completion of the installation of the pilings. The leaching of the heavy metals forming the toxic preservative impregnated into the pilings is probable due to two factors: damage to the PVC liner from collisions with inexperienced boaters and high-water conditions that exceed 1 foot over mean high water and, thus, the top of the liner. Both of these factors are exacerbated by flooding, which is addressed below. Koreshan also has failed to provide reasonable assurance that the proposed footbridge is clearly in the public interest under the seven criteria. The proposed footbridge would adversely affect the public health, safety, or welfare and the property of others through exacerbated flooding. South Lee County experienced serious flooding in 1995. In response, Lee County and the South Florida Water Management District have attempted to improve the capacity of natural flowways, in part by clearing rivers of snags and other impediments to flow, including, in the case of the Imperial River, a bridge. One important experience learned from the 1995 floods was to eliminate, where possible, structures in the river, such as snags and pilings, that collect debris in floodwaters and thereby decrease the drainage capacity of the waterway when drainage capacity is most needed. Longer term, the South Florida Water Management District is considering means by which to redirect stormwater from the Imperial River drainage to the Estero River drainage. The addition of five pilings (more as the river rose) would exacerbate flooding. On this basis alone, Koreshan has failed to provide reasonable assurance. Additionally, though, the HEC II model output offered by Koreshan does not consider flooding based on out-of-banks flows, but only on the basis of roadway flows. In other words, any assurances as to flooding in the design storm are assurances only that U.S. Route 41 will not be flooded, not that the lower surrounding land will not be flooded. Koreshan failed to provide reasonable assurance that the proposed activity would not adversely affect the conservation of fish and wildlife, for the reasons already stated with respect to water quality. Koreshan failed to provide reasonable assurance that the proposed activity would not adversely affect navigation or the flow of water. The flow of water is addressed above. Navigation is best addressed together with the next criterion: whether the proposed activity would adversely affect fishing or recreational values or marine productivity in the vicinity of the activity. Despite the presence of only two public launch sites, boating is popular on the Estero River. Reflective of the population growth of Collier County to the south and the area of Lee County to the north, the number of boaters on the Estero River has grown steadily over the years. The canoe- rental business located on the 8.5-acre parcel rented canoes or kayaks to over 10,000 persons in 1996. Many other persons launched their canoes or kayaks for free from this site and the nearby state park. Lee County businesses derive $800,000,000 annually from tourism with ecotourism a growing component of this industry. The Estero River is an important feature of this industry, and the aquatic preserve at the mouth of the river and the state park just downstream from the proposed footbridge provide substantial protection to the scenic and environmental values that drive recreational interest in the river. It is unnecessary to consider the aesthetic effect of a footbridge spanning one of the more attractive segments of the Estero River. The proposed footbridge and its five pilings effectively divide the river into six segments of no more than 14 feet each. This fact alone diminishes the recreational value of the river for the many canoeists and kayakers who cannot reliably navigate the U.S. Route 41 bridge pilings, which are more than twice as far apart. As to the remaining criteria, the proposed footbridge would be permanent and the condition and relative value of functions being performed by areas affected by the proposed activity is high. There is conflicting evidence as to whether the proposed footbridge would adversely affect the remnants of an historic dock, but it is unnecessary to resolve this conflict. The mitigation proposed by Koreshan does not address the deficiencies inherent in the proposed activity.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order dismissing the petition of Petitioner Council of Civic Associations, Inc., and denying the application of Respondent Koreshan Unity Foundation, Inc., for an environmental resource permit and authorization to obtain an easement for the use of sovereign land. DONE AND ENTERED this 3rd day of August, 1998, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of August, 1998. COPIES FURNISHED: Kathy Malone Vice President and Treasurer Council of Civic Associations, Inc. Post Office Box 919 Estero, Florida 33919-0919 Reginald McNeill Dorothy McNeill, President Estero Conservancy, Inc. 26000 Park Place Estero, Florida 33928 Mark E. Ebelini Humphrey & Knott, P.A. 1625 Hendry Street, Suite 301 Fort Myers, Florida 33901 Phyllis Stanley, President 12713-3 McGregor Boulevard Fort Myers, Florida 33919 Cathy S. Reiman Cummings & Lockwood Post Office Box 413032 Naples, Florida 34101-3032 Francine M. Ffolkes Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 F. Perry Odom, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (9) 120.52120.57120.68253.77267.061373.4136373.414373.421403.031 Florida Administrative Code (8) 18-21.00318-21.00418-21.0040118-21.00518-21.005162-302.20062-302.70062-4.242