Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
VARIAN INSTRUMENT GROUP vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 89-005058BID (1989)
Division of Administrative Hearings, Florida Filed:Brooksville, Florida Sep. 18, 1989 Number: 89-005058BID Latest Update: Feb. 07, 1990

Findings Of Fact In July, 1989 the District published its request for bids (number 8980) for an atomic absorption spetrophotometer in local newspapers and to prospective interested parties, as shown in joint Exhibit 1 in evidence. The specifications for the instrument were included in the bid package and were authored by Mark Rials, the District's Laboratory Supervisor. The District received two bids for the instrument in response to the request for bids, one from Varian for approximately $57,000 and one from Perkin-Elmer for approximately $59,900. Mark Rials evaluated the bids. Upon evaluation it was determined that the Varian instrument proposal did not meet bid specifications in three major areas. The specifications required a system capacity of 40 megabytes, hard drive capability. The capacity offered by Varian in its bid was for 20 megabytes. The specifications required a combination of a 5 1/4 inch disk drive for its computer system as well as a 3 1/2 inch disk drive. Varian only bid the 3 1/2 inch diskdrive. It did not offer the 5 1/4 inch disk drive which was required. Additionally, at item IX of the specifications, the District required that a list be submitted with the bid which stated, on an item-by-item basis, how the instrument met or exceeded the specifications. Each item in the specifications had been carefully selected to insure optimum performance for the laboratory so that exceptions to the specifications were required to be noted and attached in the bid response. Varian failed to conform to this item of the specifications. This item allowed a vendor to describe in its bid response how it could differently meet the specifications in a better manner or even exceed the specifications, but Varian failed to provide this itemized list. It was also determined that the Varian bid did not conform with the specifications of item IV page 4 of the invitation to bid document concerning the provision of service manuals, system and application software documentation, methods, manuals, parts catalogs, supplies, accessories, catalog, and training manuals. Conversely, it was determined that the Perkin-Elmer bid was responsive in all respects, met the bid specification in these major categories and was the most responsive bidder. After witness Rials conducted the evaluation of the bids, in terms of compliance with the specifications, he and the District determined that the Perkin-Elmer bid was the lowest, responsive bidder which met all specifications. It duly published the intended award and notified all bidders of the bid results. In this evaluation and award process it was demonstrated that the District followed all applicable procedures in its rules and policies concerning evaluation and award. Varian timely filed an objection to the award of the bid; and in accordance with its normal bid protest procedures, the District scheduled a conference between representatives of Varian and District representatives to review Varian's bid. Varian made several statements at that meeting which constituted a substantial deviation from the bid package it had earlier submitted and amounted to an attempted restructuring of its bid in an effort to meet bid specifications. The District declined to countenance this effort and adhered to its initial intent to reject the bid which was submitted by Varian and to not allow the attempted material deviations to be ascribed to Varian's bid, after the point of bid opening and announcement of award. In summary, based upon the bid specifications issued by the District the evaluator's determination concerning the specifications that the evaluator drafted was that the Varian instrument failed to meet bid specifications because of the major deficiencies in the areas found above, regarding systems capacity, computer disk drive availability, and specification response. It has clearly been demonstrated by competent substantial evidence that the District's decision to reject Varian's bid was a reasonable one. It was based solely on a fair comparison of the response of the two bids to the specifications contained in the invitation to bid and notice to all potential vendors. In consideration of the facts established by the evidence in this record, it is found that the bid by Perkin-Elmer substantially met all bid requirements or specifications, even though the Perkin-Elmer bid was the second low bidder in terms of dollar cost. Since the low-cost bidder, Varian, failed to meet major bid specifications, the facts demonstrate that the Perkin-Elmer bid was the most responsive of the two bids at issue and is, therefore, the best bid. Consequently, award should be given to the Perkin-Elmer bid for the instrument in question.

Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence of record, the candor and demeanor of the witnesses, and the pleading and arguments of the parties it is therefore RECOMMENDED: That the Southwest Florida Water Management District issue a final order denying the petition filed by Varian Instrument Group and awarding bid number 8980 to Perkin-Elmer Corporation, as the lowest, responsive bidder. DONE and ENTERED this 6th day of February, 1990, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of February, 1990. APPENDIX Respondent's Proposed Findings of Fact 1-9 are accepted. Petitioner Filed No Proposed Findings of Fact. COPIES FURNISHED: Mr. Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899 Mickey McAllister District Sales Manager Varian Instrument Group 505 Julie Rivers Road, Suite 150 Sugar Land, TX 77478 A. Wayne Alfieri, Esquire Edward B. Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899

Florida Laws (1) 120.57
# 1
SHAFER AND MILLER, INC. vs. DEPARTMENT OF GENERAL SERVICES, 76-001375 (1976)
Division of Administrative Hearings, Florida Number: 76-001375 Latest Update: Oct. 05, 1977

The Issue Whether Petitioner should be granted an equitable adjustment to increase the contract price in the amount of $337,714 for a mistake in bid on project No. BR-7702/8701, Library/Auditorium, Florida International University.

Findings Of Fact In April 1974, Respondent advertised for bids for the construction of a library-auditorium building at Florida International University, Miami, Florida, State Project No. B.R. 7702/8701. Respondent's representative for this project was the architectural firm of Ferendino/Grafton/Spillis/Candela, Coral Gables, Florida. The advertisement for bids specified that sealed bids would be received until 2:00 p.m. on May 16, 1974, at which time they would be publicly opened and read aloud. In fact, the advertised time period was extended until the same hour on May 23, 1974. The advertisement provided that bids must be submitted on the proposal form furnished by the architect/engineer and be accompanied by a bid bond or an equivalent cash amount in a sum not less than five per cent of the amount of the base bid as a guarantee that the bidder would enter into an agreement with the owner if this bid was accepted. It further provided that the bid would remain in force for thirty (30) days after the time of opening. The advertisement also contained the following statement: "The Department of General Services reserves the right to reject any and all bids and to waive informalities in any bid whenever such rejection or waiver is in the interest of the State of Florida." (Exhibit 1a, testimony of Williams) In preparing its bid on the project, Petitioner utilized two company forms. One included columns for the various portions of the work with blocks opposite each portion for the insertion of the names of subcontractors and the amounts of their bids. The other form was a recapitulation of the low subcontractors' bid by the various segments of the contract, and the form also included spaces and amounts for the work to be accomplished by the contractor itself. The normal procedure followed by Petitioner in this and prior projects was to enter subcontractors' bids on the subcontractor's bid tabulation form when received over the telephone and, when all such bids had been received shortly before the deadline for submission of bids by the prime contractors on the project, to enter each low subcontractor bid on the recapitulation form. This would then be totaled to arrive at Petitioner's bid to be submitted to Respondent. (Testimony of Kearns). The subcontractor tabulation form for the instant project listed an item for "PRECAST STRUCTURAL." Opposite this entry in blocks on the form had been printed the names of subcontractors from whom Petitioner expected to receive bids, including Pre-Stressed Systems, Inc. (P.S.I.), Meekins, Stresscon, and Houdaille. However, since there were two different pre-case structural items called for under the specification, i.e., joists under section 3-B and pre-case panels under section 3-C, the words and figures "3B Joists" and "3C panels" were penciled in above and below the printed words "PRE-CAST STRUCTURAL" to show the need for entering bid figures for both items. However, there was no separation of these items in the various blocks for subcontractor's bids. (Exhibits 1b, 1c, Testimony of Kearns) Usually bids of major subcontractors were not received until the morning of the final day for submission of the total bids, and many were not received until immediately prior to the time the bid must be tallied and submitted. On the morning of May 23, 1974, the day for bid opening, Petitioner's employee, Edward A. Kearns, Jr., an estimator, was responsible for preparing Petitioner's bid. The only bid Petitioner had received for precast joists was that submitted by P.S.I. in the base amount of $460,000. This sum was entered on the bid tabulation from in pencil under the printed name P.S.I. Bids for the pre-cast panels were received from two of the subcontractors whose names were printed on the form an the amounts were entered in pencil as follows: "Meekins - 399,800, Stresscon - 400,00." No bid was entered for Houdaille. About 11:00 a.m., a telephonic bid on the panels was received from Cast-Crete Corporation of Kissimmee. This bid was considerably lower than that of Meekins and, because Petitioner had not heard of or dealt with Cast-Crete in the past, it asked all three bidders on the panels to verify the requirements and prices. While awaiting the return of this information, the Cast-Crete bid was not entered on the bid tabulation form. Thereafter, Cast-Crete informed Petitioner that it was raising its bid somewhat and this information was placed on a separate subcontractor bid form for cast-Crete, but not entered on the tabulation form containing all bids. The final Cast-Crete bid was in the amount of $337,714. By this time, Petitioner's office was quite hectic in that other bids were coming in at a fast pace and the phone was ringing continuously. Many bidders sought clarification on items or had to give their bids to Kearns which was time-consuming. As the time for submission by Petitioner to Respondent drew near, Kearns took the low subcontractor bids from the bid tabulation form and transferred them for each category of work to the recapitulation form. On this form, there was a single line for "Precast structural" and, on that line, Kearns entered the bid that had been received from P.S.I. for precast joists, but forgot to include any bid for the precast panes. Since no breakdown for joists and panels was shown on the recapitulation form, he assumed that bids for all portions of the work hand been included. All items on the recapitulation form were added and Petitioner arrived at a total base bid of $3,999,259, which did not include the bid for precast panels in the amount of $337,714. (Testimony of Shafer, Sr., Kearns, Exhibits 1b, 1c, 1f) Petitioner's employee, Ron Shafer, Jr., previously had been sent to the place of bid opening at Florida International University with the formal bid letter with the amounts left blank. Shortly before 2:00 p.m., Petitioner provided him by telephone with the amounts to place on the be bid form and submit to the Respondent's representative. He submitted the formal bid just prior to the deadline. The bids were thereafter opened and, although Ron Shafer, Jr., noted that Petitioner's bid was some $400,000 lower than the next lowest bidder, he was unaware of the circumstances of the mistake and returned to the office. The representative of Respondent had opened the bids and an officer of the architectural firm, Freeman J. Williams, was also present. Nothing was said at the time concerning the large disparity between Petitioner's bid and the other bids, and Williams saw no need to ask Petitioner to verify its bid at that time. (Testimony of Shafer, Jr., Williams, Exhibits 1d, 1v) Meanwhile, after Kearns had tallied the final bid figures and they had been called in to the employee at Florida International University, Petitioner's personnel sat around the office and discussed the job for several minutes. They then started to gather up all the sub-bids to put in a folder when they discovered a "subcontractor's bid form" for Cast-Crete Corporation and realized that it had not been included on the tabulation sheet or on the final recap sheet. Immediate attempts were made to telephone the architect about the mistake. When Williams was reached at his office some thirty minutes after he had left Florida International University, Petitioner requested that its bid be withdrawn after explaining the circumstances. Williams suggested that Petitioner immediately send a telegram to Respondent explaining this situation. Petitioner did so in the following language: "In reviewing our bid, we discovered we had omitted the cost of precast panels manufacturers bid from our tabulation sheet, in the amount of $282,714. We, therefor, regretfully must with- draw our bid on the FIU library and auditorium building. We could, however, accept award of contract if this amount could be added to either of our base bids. Please advise. SHAFER AND MILLER, INC. R C Shafer" In the telegram, an additional mistake was made by using the figure of $282,714 which did not include the erection of the panels in the amount of $55,000 that had been the subject of a separate bid by Cast-Crete. After receipt of the telegram, Respondent's representatives requested that Petitioner come to Tallahassee with their pertinent documents relating to the bid to discuss the matter. They did so and thereafter heard nothing further until June 5, 1974, at which time a letter was received from the Department of General Services, dated May 31, 1974, advising that, subject to final approval by the Governor and the Cabinet, it was propose to recommend acceptance of Petitioner's low bid and award the contract to it in the amount of $4,122,000 for Base Bid 1 and Priority 1 Alternate A, Priority 2, Alternate C, and Priority 3, Alternate D. The meeting of the Cabinet at which the award was to be recommended was stated in the letter to be held on June 4, 1975. Since Petitioner did not receive the letter until June 5, it had no opportunity to be present at the time matter was considered. By separate letter of May 31, 1974, the Department of General Services enclosed four copies of a standard form of agreement and performance and payment bond to be executed and returned. (Testimony of Williams, Shafer, Sr., Kearns, Exhibits 1e, 1g, 1h) Petitioner contacted legal counsel, James E. Glass, on June 5. He checked into the matter and found that the contract had already been awarded on June 4 by the Cabinet. He then telephoned Arnold Greenfield, General Counsel for the Department of General Services, and asked if the state could rebid the job at which time Petitioner would submit its original intended bid. Greenfield stated that the project was critical from a budget standpoint and that the state would not rebid it, and insisted that the Petitioner proceed or else forfeit its bid bond and be subject to suit for any excess costs of performance. Glass reminded Greenfield that Petitioner proceed or else forfeit its bid bond and be subject to suit for any excess costs of performance. Glass reminded Greenfield that Petitioner could seek injunctive relief in the matter, and the latter then stated that if Petitioner would proceed with the contract, Respondent would acknowledge its right to claim a modification of the contract. This conversation was confirmed in a letter from Greenfield to Glass, dated June 7, 1974, wherein it was stated "We further understand that your client may wish to seek a modification of such contract, after execution." Glass, in a return letter dated June 12, returned the executed contracts and bonds, stating that Petitioner was doing so in order to act "equitably and in good faith", and was fully reserving its rights to contest the erroneous bid by judicial action for equitable relief. Thereafter, Petitioner received notice to proceed with the work and in due course satisfactorily completed the contract within the required period. This was evidenced by a certificate of acceptance of the building by the using agency, which was approved by Respondent on December 4, 1975. (Testimony of Glass, Exhibit 1e, 1g, 1h, 1i, 1j, 11, 1m, 1s) In December, 1974, Petitioner had submitted its claim for an equitable adjustment in the amount of $337,714 which was the amount of the omitted Cast- Crete bid. During the ensuing year Petitioner submitted audits of its expenses on the job to Respondent and in January, 1976, further audit information was provided at the request of Respondent. On May 6, 1976, Respondent informed Petitioner that it would not approve any increase in the contract amount. Thereafter, on June 11, Petitioner filed its petition herein seeking an equitable adjustment in the amount of $337,714. The petition was referred to the Division of Administrative Hearings by the Respondent on August 2, 1976, and the undersigned Hearing Officer was assigned to conduct the hearing therein. (Exhibit 1r, 2, 4, 5, 6) By a Motion to Abate, dated August 23, 1976, Respondent requested that the matter be held in abeyance pending the submission of the petition to the project architect and his rendering of a determination indicating whether the relief should be granted or denied, as a "condition precedent to the contractor obtaining consideration of said petition in any proceeding authorized by Chapter 120, Florida Statutes." Respondent stated in its motion that the contract clearly provided that nay and all claims or disputes should be first submitted to the architect for determination, and that thereafter, either party could obtain administrative review of the determination by filing a written appeal to the Department of General Services within thirty days. The motion further stated that since this prerequisite had not been accomplished, there was no basis for an administrative appeal at that time. On the same date, Respondent advised the architect of the situation and requested expeditious consideration of the matter. On August 27, the architect issued its determination stating "From our personal knowledge of the events during the bid opening process, and the subsequent events that led to the awarding of the bid, we concur in the contractor's request." In November 1976, Respondent's general counsel advised the Hearing Officer that settlement efforts were in progress but requested that the matter be scheduled for hearing nevertheless. Notice of hearing was issued on December 15, 1976, and the case was heard on January 27, 1977. (Exhibits 1t, 1u, Pleadings) Petitioner's intended total bid, including alternates, amounted to $4,459,714. A change order of $194 was issued during the course of the work, amounting to a total of $4,459,908. Petitioner's direct costs on the project were $4,094,890. Overhead was computed at 2.85 per cent of direct costs in the amount of $116,705, for a total cost of $4,211,595. Overhead was computed based on the ratio of total general and administrative expense to total direct costs incurred on all of Petitioner's jobs in process for the year ending May 31, 1975. However, the audit reports included payment in the amount of $335,634 to Cast-Crete Corporation. The actual amount paid to that firm was $325,234 - difference of $10,400, making Petitioner's actual costs $4,201,195. During the course of the contract, Respondent paid Petitioner $4,122,194, resulting in a net loss to Petitioner of $79,001. An anticipated profit for performance of the contract was computed on the basis of the average profit on other jobs of 4.4 per cent, amounting to the sum of $180,377. The latter two sums total $259,378, and it is found that figure is the reasonable amount of Petitioner's claim. (Exhibits 2-5)

Recommendation That Petitioner's claim for equitable adjustment under Project No. BR- 7702/8701 be granted and that a change order be issued increasing the contract price by $259,378.00. DONE and ENTERED this 21st day of March, 1977, in Tallahassee, Florida. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings Room 530 Carlton Building Tallahassee, Florida 32304 (904) 388-9675 COPIES FURNISHED: Donna H. Stinson and Daniel S. Dearing, Esquires Post Office Box 1118 Tallahassee, Florida 32302 James E. Glass, Esquire 2600 First Federal Building 1 Southeast 3rd Avenue Miami, Florida 33131 John A. Barley, Esquire General Counsel Department of General Services Room 110 Larson Building Tallahassee, Florida 32301

Florida Laws (1) 120.57
# 2
TALLAHASSEE ASSOCIATES, LTD. vs DIVISION OF LICENSING AND CROSSLAND AGENCY, 91-001306BID (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 26, 1991 Number: 91-001306BID Latest Update: Mar. 22, 1991

Findings Of Fact In November, 1990, the Respondent, the Department of State, sought proposals for the lease of office space for its Division of Licensing. On or prior to December 7, 1990, the proposal opening date, at least six proposals were received by the Respondent. Those proposals were designated by the Respondent as "Tallahassee Associates" (the Petitioner's proposal), "Crossland Agency" (the Intervenor's proposal), "Woodcrest A", "Woodcrest B", "T.C.S." and "DeVoe". On January 2, 1991, the Respondent posted a standard form Bid Tabulation indicating that the following scores had been awarded to the following proposals: Proposal Score Woodcrest A 82 Woodcrest B 82 Tallahassee Associates 73 Crossland Agency 85 DeVoe 54 The proposal of T.C.S. was not evaluated by the Respondent because it was determined to be non-responsive. The Respondent also posted a copy of a memorandum dated January 2, 1991, with the January 2, 1991, Bid Tabulation. The memorandum was from John M. Russi, Director of the Division of Licensing, to Ira Chester, Chief of the Bureau of General Services. Mr. Russi indicated in the memorandum that the Intervenor would be awarded the lease. Attached to Mr. Russi's January 2, 1991, memorandum was a Lease Evaluation Worksheet which indicated the scores which had been awarded by the evaluation committee to the responsive bidders for each of the criteria to be considered in determining the winning bidder. Printed at the top-center of the January 2, 1991, Bid Tabulation was the following notice: FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.53(5), FLORIDA STATUTES, SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, FLORIDA STATUTES. . . . The January 2, 1991, Bid Tabulation was posted at 1:00 p.m., January 2, 1991. Therefore, pursuant to Section 120.53(5), Florida Statutes, any bidder desiring to contest the Respondent's proposed award of the lease was required to file a notice of protest with the Respondent no later than 1:00 p.m., January 5, 1991, and a formal written protest on or before January 15, 1991. T.C.S. filed a notice of protest and a formal written protest to the January 2, 1991, Bid Tabulation within the time periods prescribed by Section 120.53(5), Florida Statutes. T.C.S. contested the Respondent's determination that it was not responsive. The Petitioner did not file a notice of protest or a formal written protest to the January 2, 1991, Bid Tabulation within the time periods prescribed by Section 120.53(5), Florida Statutes. Pursuant to Section 120.53(5), Florida Statutes, the Respondent reviewed the formal written protest filed by T.C.S. and agreed that T.C.S. was responsive. After agreeing that T.C.S. was responsive, the Respondent evaluated T.C.S.'s proposal and awarded points for each of the criteria to be considered. Toward the end of January, 1991, after deciding that T.C.S.'s proposal was to be evaluated, the Respondent notified all other bidders of its decision in a document titled Posting of Notice of Agency Decision. The Posting of Notice of Agency Decision was signed by the Respondent's General Counsel and was addressed to "All Responsive Bidders". The Posting of Notice of Agency Decision provided, in pertinent part: Notice is hereby given that the Florida Department of State, Division of Licensing, is reviewing the bid tabulation which was posted at 1:00 P.M., January 2, 1991 for Lease No. 450:0070. The revised bid tabulation will be posted at 8:00 A.M. on February 4, 1991 at the Purchasing Office of the Department of State . . . . Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceeding under Chapter 120, Florida Statutes. Any person interested in the new tabulation should contact . . . after the posting time listed above. The Petitioner filed a notice of protest and a formal written protest challenging the Posting of Notice of Agency Decision within the times prescribed by Section 120.53(5), Florida Statutes. The Respondent dismissed this formal written protest by final order dated February 22, 1991. On or about January 31, 1991, more than four weeks after the posting of the January 2, 1991, Bid Tabulation, Ocie Allen spoke by telephone with Phyllis Slater, the Respondent's General Counsel. Ms. Slater told Mr. Allen that all proposals would be reevaluated as a result of T.C.S.'s protest. Mr. Allen was a lobbyist for the Petitioner in January, 1991. On February 4, 1991, the Respondent posted another standard form Bid Tabulation indicating that the following scores had been awarded to the following proposals: Proposal Score Crossland Agency 83 Woodcrest A 80 Woodcrest B 80 Tallahassee Associates 71 T.C.S. 71 DeVoe 51 The differences in the scores of the proposals which had been listed on the January 2, 1991, Bid Tabulation, which are reflected in the February 4, 1991, Bid Tabulation were caused by automatic changes in the scores resulting from the addition of T.C.S. and the fact that T.C.S. had the lowest priced bid. The points awarded for the "rental" criterion, which was worth up to 25 points, were determined by a mathematical formula by which the scores of each bidder are calculated based upon the proposed rental charges of all bidders. The award of points for this criterion was determined objectively based upon the mathematical formula. By adding another bidder, T.C.S., the points awarded to all the proposals automatically changed. The scores of the proposals which had been listed on the January 2, 1991, Bid Tabulation, were not otherwise changed. Nor were the proposals of any bidder reevaluated. The Respondent also posted a copy of a memorandum dated January 24, 1991, with the February 4, 1991, Bid Tabulation. The memorandum was from John M. Russi, Director of the Division of Licensing, to Ira Chester, Chief of the Bureau of General Services. Mr. Russi indicated the following in the memorandum: Pursuant to the settlement stipulation signed by Counsel for T.C.S. Associates on January 23, 1991, in reference to the Bid Protest filed January 11, 1991, the attached "Lease Evaluation Work Sheet" is provided for you to re-post. After reevaluating six bid proposals, the evaluating committee concludes that Crossland Agency should be awarded this bid. Each bidder needs to be notified by certified mail of this action. . . . . Attached to Mr. Russi's January 24, 1991, memorandum was a Lease Evaluation Worksheet which indicated the scores of the responsive bidders which had been awarded by the evaluation committee for each of the criteria to be considered in determining the winning bidder. On February 6, 1991, the Petitioner filed a notice of protest to the February 4, 1991, Bid Tabulation. The Petitioner filed a Formal Written Protest, Request for Formal Hearing and Motion for Stay with the Respondent on February 18, 1991. These documents were filed within the time periods specified in Section 120.53(5), Florida Statutes. The Petitioner's Formal Written Protest was filed with the Division of Administrative Hearings by the Respondent on February 28, 1991. Crossland Agency, Inc., was allowed to intervene in the proceeding. On March 1, 1991, the Respondent and Intervenor filed a Motion to Dismiss. A motion hearing was conducted on March 6, 1991, to consider the Motion to Dismiss.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be issued by the Respondent granting the Motion to Dismiss and dismissing this case, with prejudice. DONE and ENTERED this 22nd day of March, 1991, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of March, 1991. APPENDIX TO RECOMMENDED ORDER The parties have submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Petitioner's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 3, 5 and 9. 2 12-13. 3 15-16 and 18-21. See 14. 15. The weight of the evidence failed to prove that the scores of the bidders for the "option period" criterion reflected on the January 2, 1991, Bid Tabulation were modified or reconsidered on the February 4, 1991, Bid Tabulation. The suggestion that "the department had discretion to change scores in any of the remaining eight categories" is a conclusion of law and is rejected. These proposed facts are not relevant to the issue raised in the Motion to Dismiss. Nor was any evidence presented to support these proposed findings. 12. The last sentence is a conclusion of law and is rejected. Proposed Findings of Fact of the Respondent and Intervenor Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 1-2. 3 and 7. 5-6 and hereby accepted. 4 8-12. 5 See 14. 6 15 and 17. 18. The last sentence involves an issue not raised in the Motion to Dismiss or at the motion hearing. Nor was any evidence presented to support these proposed findings. See the Preliminary Statement. COPIES FURNISHED: Linda G. Miklowitz, Esquire 1589 Metropolitan Boulevard Tallahassee, Florida 32308 Benjamin E. Poitevent Assistant General Counsel Department of State The Capitol, MS #4 Tallahassee, Florida 32399-0250 M. Christopher Bryant, Esquire Post Office Box 6507 Tallahassee, Florida 32314-6507 Honorable Jim Smith Secretary of State The Capitol Tallahassee, Florida 32399-0250

Florida Laws (3) 120.53120.57255.25
# 3
ALL AMERICAN COMPANIES vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-002777BID (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 12, 2002 Number: 02-002777BID Latest Update: Oct. 25, 2002

The Issue At issue in this proceeding is whether the Department of Environmental Protection's decision to reject all bids submitted for the project entitled BDRS 52-01/02 was illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact Parties Petitioner, All America Homes of Gainesville, Inc. (All America), is a corporation doing business in the State of Florida. All America submitted a timely written bid in response to the Department's ITB and filed timely protests to the Department's actions. The Respondent, the Department of Environmental Protection, is an agency of the State of Florida which manages and operates state parks under its jurisdiction, and solicits construction projects in state parks, pursuant to Chapter 258, Part I, Florida Statutes, through its Division of Recreation and Parks, Bureau of Design and Recreation Services. The ITB In November, 2001, the Department issued an ITB on a construction project entitled Hillsborough River State Park Concession Building, project number BDRS 52-01/02. The ITB included the Bid Specifications for the project. Bids were required to be submitted no later than 3:30 p.m. on Tuesday, December 18, 2001, at the Bureau's Tallahassee, Florida, office. The written Specifications define several terms, including, but not limited, to the following: ADDENDUM: A written explanation, interpretation, change, correction, addition, deletion, or modification, affecting the contract documents, including drawings and specifications issued by the OWNER [Department] and distributed to the prospective Bidders prior to the bid opening. ALTERNATE BID: Separate optional bid item for more or less project requirement used for tailoring project to available funding. Also may consist of alternate construction techniques. BASE BID: Formal bid exclusive of any alternate bids. BID FORM: The official form on which the OWNER requires formal bids to be prepared and submitted. ORAL STATEMENTS: Verbal instruction. NOTE: No oral statement of any person, whomever shall in any manner or degree modify or otherwise affect the provisions of the contract documents.[1] SEALED BID: The formal written offer of the Bidder for the proposed work when submitted on the prescribed bid form, properly signed and guaranteed. The Bid Specifications also contained the following relevant sections: Alternatives If the OWNER wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use of type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically indicated and referenced to the drawings and specifications. Alternates will be listed in the bid form in such a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid. The OWNER will judge for himself that such alternates are of comparable character and quality to the specified items. The Order of the alternate may be selected by the Department in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. ADDENDA If the Consultant[2] finds it would be expedient to supplement, modify or interpret any portion of the bidding documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the bidding documents which will be delivered or mailed by the OWNER'S Contracts section to all bidders who have requested bidding documents. Interpretation No interpretation of the meaning of the drawings, specifications or other bidding documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction should be in writing, addressed to the Consultant. All such interpretations and supplemental instructions will be in the form of written Addenda to the bidding documents. Only the interpretation or correction so given by the Consultant in writing and approved by the OWNER shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the bidding documents. B-16 Bid Modification Bid modification will be accepted from Bidders, if addressed as indicated in Advertisement for Bids and if received prior to the opening of bids. No bid modification will be accepted after the close of bidding has been announced. Modifications will only be accepted if addressed in written or printed form submitted with the bid in sealed envelopes. Telegrams, facsimiles, separate sealed envelopes, written on printed modifications on the outside of the sealed envelopes will not be accepted. All bid modifications must be signed by an authorized representative of the Bidder. Modification will be read by the OWNER at the opening of formal bids. B-21 Rejection of Bids The OWNER reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida, and to reject the bid of a bidder who the OWNER determines is not in a position to perform the work. B-23 Award of Bid . . .The qualified Bidder submitting the lowest bid will be that Bidder who has submitted the lowest base bid plus any selected alternates. . . . The OWNER reserves the right to waive any minor irregularities in bids received when such waiver is in the interest of the OWNER. The Award of Bid will be issued by the OWNER only with responsible Bidders, found to meet all requirements for Award of Bid, qualified by experience and in a financial position to do the work specified. Each bidder shall, if so requested by the OWNER, present additional evidence of his experience, qualifications and ability to carry out the terms of the Agreement. (Emphasis in original, except for Section B-10.) The Bid Form is included with the Specifications and provides in part: Base Bid: Furnish labor, equipment, Lump Sum $ supervision and material to construct a new concession building of 2940 square feet located at the Hillsborough River State Park along with the alteration of the existing concession building according to plans and specifications. Alternate #1: Furnish labor, equipment, Add Amt.$__ supervision and material to renovate the existing concession building according to plans and specifications. There is a separate section for "Allowances," i.e., Section 01210, for the Hillsborough State Park. This section provides in part: SECTION 01210 – ALLOWANCES * * * 1.2 SUMMARY This Section includes administrative and procedural requirements governing allowances. Certain materials and equipment are specified in the Contract Documents and are defined by this [sic] specifications as material and labor to be provided against a pre-determined allowance. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. * * * 3.3 SCHEDULE OF ALLOWANCES A. Allowance #1: Include in the base bid an allowance for the purchase and installation of. . . kitchen equipment. . . . The total dollar amount of the allowance to be included shall be $12,000.00. There is also a separate section for "Alternates," i.e., section 01230, for Hillsborough River State Park, which provides in part: SECTION 01230 – ALTERNATES * * * 1.3 DEFINITIONS Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if OWNER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. . . . . 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Renovate the existing concession building in its entirety as shown in the drawings and specified herein. (emphasis added.) At this stage of the bidding documents, the contractor/bidder is requested to provide a Base Bid/Lump Sum on the Bid Form to "[f]urnish labor, equipment,. . .to construct a new concession building," and to provide an additional and separate amount for Alternate No. 1 to "[f]urnish labor, equipment, . . . to renovate the existing concession building." On December 13, 2001, the Bureau issued "Addendum No. One (1)" (written by the architect) to the ITB on the "Hillsborough River State Park – Concession Building." The Addendum contained the following relevant sections: Specification Section 01210: Allowances Add the following new paragraph 3.3.B: ”Allowance #2: Include in the base bid an allowance for the renovations of the existing concession building; renovations shall be defined by the Owner. The total dollar amount of the allowance to be included shall be $25,000." Specification Section 01230: Alternates Modify paragraph 3.1.A. as follows: "Alternate No. 1: Renovate the existing concession building as defined by the Owner, and as provided for under Section 01210, Allowances." (emphasis added.) Each contractor was required to sign the Addendum and attach it to the bid. By definition, and pertinent here, an addendum is an additional written instruction to a contractor during the bidding process. Based on the weight of the evidence, the purpose of this Addendum was to require the contractor to include a $25,000.00 Allowance (for Allowance # 2) in the Base Bid, for the work which might be performed if the Department requested the work to be performed for Alternate No. 1, i.e., for the renovation of the existing concession building.3 (The Department's architect decided it would cost approximately $25,000.00 to renovate the existing concession building, hence Allowance # 2.) In other words, the Addendum does not have a specific dollar amount to be included for Alternate No. 1. Rather, the $25,000.00 is an Allowance for the work described as Alternate No. 1, but the amount is to be included in the Base Bid and not as a separate line item, dollar amount. But, importantly, the Addendum did not delete the potential work to be performed as described in Alternate No. 1, although Mr. Bowman and others believed that the Addendum deleted Alternate No. 1. It deleted the necessity to place a specific dollar amount on the Bid Form for Alternate No. 1. (Mr. Bowman is a registered Professional Engineer and a licensed contractor. He has worked for the Department for 15 years and has served as Bureau Chief for two years. He supervises the contract section and the design section, which was responsible for preparing the technical plans and specifications and bidding out the job.) Mr. Bowman offered the following explanation why he believed the Addendum was confusing: Okay. I think the confusion that was created, you know, I think the addendum in itself, you know, said add $25,000 to the base bid, but then on the bid form, it still had the space down there for alternate number one, which alternate number one, which alternate number one had become $25,000 that was to be allowed for the concession building, and I think that's where the confusion came in because I think they were still confused, that they weren't really sure that they should not put that 25 down there but they knew they had been told in the addendum to do it and I think that's the reason for the notes and we got to the correspondence on the bid form, was they wanted to make sure that that's what we were wanting to do. And I think that's where the confusion came in. Like I said, it's always, if you could go back and do it again, it would be much wiser just to issue a whole new bid form and then we wouldn't be here today. But, we didn't do that. Okay. So, that's why we are here. The language in this Addendum, when read with the original Bid Specifications, apparently caused confusion with some of the bidders on the project. Several bidders called Marvin Allen (an architect and project manager for the Department's Bureau of Design and Recreation Services) prior to the submission of the bids, to clarify how the $25,000.00 Allowance should be shown on the Bid Form. (Mr. Allen did not author any of the specifications, including the Addendum.) He was listed as a contact person. He did not contact any bidders. But, Mr. Allen recalled telling each bidder who asked that the Allowance of $25,000.00 should be included in the Base Bid. But, he does not recall the names or numbers of the bidders who called, "possibly" three, four or five. Mr. Allen believed the Addendum was clear. According to Mr. Allen, the bidders who called him found the Addendum confusing. The oral responses to the bidders can be construed as interpretations of the Addendum. However, pursuant to Section B- 10 of the Specifications, any such interpretations were required to "be in the form of written Addenda to the bidding documents." Also, any such questions should have been in writing. If Section B-10 were complied with, all bidders would have been potentially on the same footing, or, at the very least, would have had access to a written clarifying document. Opening of the Bids On December 18, 2001, the bids were opened by Mike Renard, Contracts Manager with the Bureau of Design and Recreation Services, and Susan Maynard, Administrative Assistant. Mr. Dwight Fitzpatrick, a representative of All America, also attended the bid opening. The Bid Form submitted by Nelco showed a Base Bid of $355,478.00 (Lump Sum $355,478.00), and also showed an amount of $25,000.00 on the Alternate # 1 line (Add Amt. $25,000.00). See Finding of Fact 6. (It was clear to Mr. Renard that the $25,000.00 should have been included on Nelco's Base Bid. But Mr. Renard believed that Nelco submitted a responsive bid because the Department only accepted the Base Bid. Mr. Bowman agreed.) Nelco was the only one of five bidders to have a dollar amount in the Alternate #1 line under "Add Amt. $ ." All America submitted the second lowest Base Bid of $362,000.00. There was also a hand-written note on the All- America Bid Form that stated: "Addenda # 1 instruction to place $25,000 allowance in both Base Bid and as alternate # 1." Another hand written note was located below the "Add Amt. $-0-" line: "amount added in Base Bid with $25,000 allowance per Marvin Allen." The Department considered All America's bid responsive. It is a fair inference that three out of five of the other Bid Forms contained language indicating that the bidders were relying on Addendum No. One by placing the $25,000.00 Allowance in the Base Bid.4 It is uncertain whether they did so in light of the instructions of Mr. Allen concerning how to complete the Bids Forms. However, given the nature of the calls to Mr. Allen, there is a reasonable inference that there was some confusion among some of the bidders. The Department determined that Nelco submitted the lowest Base Bid, but the Department's staff had a question as to whether Nelco had included the $25,000.00 in its Base Bid. After conferring with his superiors, Mr. Renard was instructed to call Nelco to make certain that its Base Bid included the Allowance amount ($25,000.00). Mr. Renard spoke with Steve Cleveland, Nelco's Project Manager, "to verify the fact that [Nelco] had the allowance in their base bid." Mr. Cleveland orally confirmed that Nelco's Base Bid included the $25,000.00 Allowance. Mr. Renard asked Mr. Cleveland to send him a letter verifying this statement. Mr. Renard viewed this inquiry as a request for clarification or verification, not an opportunity for Nelco to modify its bid. Mr. Bowman agreed. (Mr. Renard did not believe Addendum No. 1 was confusing.) In a letter dated December 20, 2001, Mr. Cleveland confirmed that Nelco’s Base Bid of $355,478.00 included the Allowance amount and that Nelco could still perform the contract if the $25,000 Allowance was removed from its Base Bid pursuant to the ITB, i.e., that Nelco would perform the contract for $355,478.00 less $25,000.00, or $330,478.00, if the Department did not accept Alternate # 1 and the Allowance. (An alternate does not have to be accepted by the Department.) According to Mr. Renard, Mr. Cleveland never mentioned modifying, changing, or altering Nelco's bid. The Department only accepted the Base Bid for each bid. Mr. Renard did not consider it unusual to call a bidder or contractor to verify information to determine whether they can or cannot perform the work at the stipulated price. He considered it common to make this inquiry. Also, it was common in Mr. Bowman's experience to call a bidder to get clarification. Mr. Renard was not aware of any statute or rule which authorizes the Department to request clarification from a bidder after the bids are opened. Mr. Renard was more familiar with the bid forms than Mr. Allen. After receiving Mr. Cleveland's letter, the Department determined that Nelco submitted the lowest Base Bid and that the $25,000.00 amount that Nelco wrote on the Bid Form Alternate # 1 line, was a minor irregularity in the bid which the Department, as the Owner, could waive pursuant to the ITB. On December 20, 2001, the Department posted the Tabulation of Bids showing the anticipated award of the contract to Nelco. At the hearing, an unsigned letter on Department letterhead was introduced, which was addressed to Nelco and stated that Nelco submitted the apparent low bid. However, Mr. Renard testified that these letters are prepared routinely, but not mailed out without his signature. Mr. Renard did not recall signing the letter or ever sending out such a letter to Nelco. On December 21, 2001, the Department received a Notice of Intent to Protest letter from Allen E. Stine, the President of All America. In his letter, Mr. Stine stated that Nelco’s bid should have been rejected for failure to follow the specified format as per Addendum No. 1, or adjusted to have the $25,000.00 amount added to their Base Bid. Bid Protests All America filed a written formal bid protest on January 4, 2001. On January 9, 2001, Cindy Otero of All America, notified Mr. Renard by letter, and stated that Mr. Stine was available for a hearing regarding the bid protest. On January 28, 2002, Mr. Renard returned All America's check for the bond, stating that it was unnecessary. Mr. Stine recounted a number of unanswered telephone calls after the first protest was filed. During one conversation, Mr. Renard recalled Mr. Stine saying to him, "You can't do this, you can't do this." After receiving the first formal protest, the Department staff consulted with legal staff and reviewed the documents and bid procedures. Based on the number of questions received concerning the Addendum and the hand-written notes on several of the bid forms, Mr. Bowman, Bureau Chief, determined that the bid documents were confusing and ambiguous. (Mr. Bowman stated that this was their first bid protest in his 15 years with the Department.) Therefore, Mr. Bowman decided that it would in the best interest of the State of Florida to reject all of the bids pursuant to the Bid Specifications. Mr. Bowman felt that the ITB should be re-written in order to make it clearer and allowing all of the bidders to re-bid the project without any confusion or ambiguity. Mr. Stine stated that his "senior estimator" told him that the bid language "could be confusing." He and his "senior estimator" had a discussion about whether the Allowance should have been placed in the Base Bid or not. At the time of submission of All America's bid, Mr. Stine was clear that the Allowance should be placed in the Base Bid, especially after calling Mr. Allen. But, his senior estimator was not so clear. In order to appease him, Mr. Stine placed the hand-written note on All America’s proposal. Mr. Stine essentially, "cleaned" up his proposal. At the hearing, Mr. Bowman testified Rule 60D-5.0071, Florida Administrative Code, see Conclusion of Law 59, does not list "confusing or ambiguous bid specifications" as one of the circumstances allowing for the rejection of all bids. However, Mr. Bowman later stated during the hearing that he believed the circumstances listed in Rule 60D-5.0071 were not the only circumstances authorizing the Department to reject all bids. Mr. Bowman testified that he believed that general confusion among the bidders caused by the ambiguous ITB constituted sufficient grounds for rejecting all bids. Mr. Bowman was advised by legal counsel that rejecting all of the bids would probably result in another bid protest by Nelco, All America, or both. Thus, the Department decided to delay addressing All American’s first protest until after posting the rejection of all bids and receiving the subsequent protests, so that all of the protests could be resolved at once in an efficient and economical manner. Notwithstanding the Department's justifications for rejecting all bids and not proceeding on All America's initial protest, the record is unclear why the Department waited several months to reject all bids. On May 13, 2002, the Department posted the rejection of all bids. On May 16, 2002, the Department received a formal written protest of the rejection of all bids filed by All America. On May 17, 2002, Jerome I. Johnson, attorney for the Department, contacted Mr. Robert A. Lash, All America's counsel at the time, concerning the resolution of All America’s formal protest. (Before the final hearing, Mr. Lash, with All America's consent, withdrew as counsel for All America.) The parties agreed to suspend formal bid protest procedures until a meeting could be held between the parties in an attempt to resolve the protests. Mr. Johnson sent a letter dated May 21, 2002, to Mr. Lash confirming this conversation. On June 26, 2002, a meeting was held among the Department staff, legal staff, and Mr. Lash and Mr. Stine, representing All America. The parties were unable to resolve the protests. At the conclusion of the meeting, the parties agreed that formal protest procedures would not be implemented until Mr. Stine could confer further with his counsel. In a letter dated July 5, 2002, Mr. Lash stated that his client wished to proceed with formal protest procedures and requested an administrative hearing on the protests. Are the Specifications and Bid Documents Ambiguous and Was There Confusion? The parties stipulated that "[t]he Addendum language was confusing," notwithstanding the testimony of several witnesses that they were not confused. The Department's determination that the bid Specifications, including the Addendum, and the Bid Form, which remained unchanged after the Addendum was issued, were confusing and ambiguous, is supported by the weight of the evidence. This is particularly true regarding the Bid Form. The Addendum required the bidder to include an Allowance of $25,000.00 in the Base Bid for work described as Alternate # 1. But the Bid Form was unchanged to reflect the Addendum changes. The Bid Form retained a line for the bidder to submit an additional amount for Alternate # 1. Further, it appears that several bidders were confused, including, Mr. Stine, who spoke with Mr. Allen and requested and received clarification. Further, it is unclear whether all of the bidders, including Nelco, were aware of the oral interpretations or clarifications of the Addendum rendered to some of the bidders. Rejection of All Bids Based upon the foregoing, given the standard of review in this proceeding discussed in the Conclusions of Law, the weight of the evidence indicates that the Department's action, in rejecting all bids, was not illegal, arbitrary, dishonest, or fraudulent. The Department's staff was well-intended and made some mistakes along the way, e.g., by not changing the Bid Form, which they readily admit. But there was a rationale for rejecting all bids under the circumstances.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department issue a final order dismissing All America’s Petition to Prevent Rejection of Bids and Award Contract to Petitioner and denying All America's request for attorney’s fees and costs. DONE AND ENTERED this 24th day of September 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September 2002.

Florida Laws (3) 120.569120.57120.595
# 4
PHIL`S EXPERT TREE SERVICE vs BROWARD COUNTY SCHOOL BOARD, 06-004499BID (2006)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Nov. 09, 2006 Number: 06-004499BID Latest Update: Jun. 11, 2007

The Issue The issues in this bid protest are whether Intervenor's bid was nonresponsive because Intervenor, a corporation formed in 2005, lacks the required five years' experience in the tree trimming business; and, if so, whether Respondent's preliminary decision to award Intervenor the contract at issue was clearly erroneous, arbitrary or capricious, or contrary to competition.

Findings Of Fact Pursuant to Invitation to Bid No. 27-054X (the "ITB"), which was issued on August 10, 2006, Respondent Broward County School Board ("School Board") solicited bids for "Tree Trimming, Planting, Hurricane Cleanup, and Removal Service." Interested vendors were instructed to bid prices on numerous items of service. The items were sorted into two groups, Group A and Group B. The School Board intended to designate a "primary vendor" for each group, who in the ordinary course of events would receive the largest volume of work, but it reserved the right to procure services from the second and third lowest bidders in each group should it become necessary or desirable to do so. Bids were due on September 13, 2006. Section 4 of the ITB contained "Special Conditions" applicable to this procurement. Of interest in this case is Special Condition No. 11, which specified the qualifications a vendor needed to be considered for an award: BIDDER'S QUALIFICATIONS: Bidder must have at least five years experience in tree trimming services within the Miami-Dade, Broward and Palm Beach tri-county area. Bidder must submit, with the bid or uponrequest, the attached Bidder's Profile form. This report must include a minimum of three references from commercial jobs. Each reference should include the address of the actual job, work accomplished and a phone number and contact person. (Emphasis in original.) The Bidder Profile form to which Special Condition 11 referred was located in Section 7 of the ITB as Attachment 1. At the top of the Bidder Profile appeared the following direction and warning: THIS INFORMATION MUST BE SUBMITTED WITH THE BID. FAILURE TO COMPLETE THIS SECTION WILLDISQUALIFY THE SUBMITTED BID. (Emphasis in original.) Paragraph 12 of the Bidder Profile form stated as follows: References Required. Contractor to provide a list of three references. Three references from jobs completed in each of the past three years. More than one dozen vendors timely submitted bids, which the School Board opened on September 13, 2006. Among the bidders were Petitioner Phil's Expert Tree Service, Inc. ("Expert") and Intervenor Innovative Environmental Services, Inc. ("Innovative"). After tabulating the bids, the School Board determined that Innovative was the lowest and best bid from a responsive, responsible bidder with regard to Group A, followed by Expert and All County Tree & Landscape Co., Inc. ("All County"), in that order. Thus, when the award recommendations were posted on September 27, 2006, Innovative was named the intended primary awardee for Group A, Expert the first alternate, and All County the second alternate.1 Innovative is a family business whose principals are Craig and Deborah Conway, husband and wife. In the year 2000, the Conways moved to South Florida from Pennsylvania, where, for more than 20 years, they had operated a tree trimming and land clearing business. After arriving in Florida, the Conways entered into a business arrangement with Donald Richter, a certified arborist, whereby they jointly provided tree trimming services under the name "ASAP Tree Service" or "Don Richter's ASAP Tree Service." In October 2002, the Conways formed a corporation called Independent Equipment South, Inc. ("Independent"). Independent operated an equipment sales and rental business whose inventory consisted of equipment that was not being used in the family's tree trimming operations. Eventually, the Conways' tree trimming service become part of Independent's business portfolio as well. In February 2005, Innovative was incorporated. At all times relevant to this procurement, Mrs. Conway has been the sole corporate officer, Mr. Conway the company's Director of Operations. In addition, at all relevant times, Innovative has employed or otherwise retained Mr. Richter as its certified arborist. Although Innovative and Independent are separate corporate entities, the two businesses operate out of the same location, have the same employees, and use the same equipment. The Conways commonly refer to their businesses as "IES," using that acronym interchangeably to mean either Innovative or Independent (or both). Innovative's Bidder Profile, which was submitted together with its bid, referred to——and incorporated——an attachment entitled, "Brief Company History." The Brief Company History provided background information on Innovative's provenance, albeit from a layperson's perspective. Written by nonlawyers, the summary was not always technically precise, from a legal standpoint, in its descriptions of the various business associations in which the Conways have been involved. Seizing on the least artful phrases, Expert contends that some of the statements in the Brief Company History were false and perhaps even fraudulent. The undersigned, however, finds otherwise. To the point, the Brief Company History reflects an honest attempt truthfully to describe the Conways' family businesses, which is reasonably accurate when read and understood from the perspective of the small-business owners who prepared it. That said, the undersigned finds and determines that Innovative——as distinct from its principals and/or personnel—— did not have five years' experience in the tree trimming business when it bid on the contract at hand, notwithstanding the wealth of tree trimming experience at its disposal. Indeed, having been in existence for fewer than two years at the time it submitted its bid, Innovative, as a separate legal entity, could not possibly have garnered, in its own right, five years' experience doing anything. For the same reason, though Innovative provided plenty of references, the ones that stemmed from jobs completed before February 2005 necessarily related to providers other than Innovative, such as ASAP Tree Service, who actually existed then. To be sure, the providers who earned the references from earlier jobs upon which Innovative relied either were predecessor business associations or individuals who would become personnel of Innovative——but they were not Innovative. Innovative simply could not have performed or completed any jobs before its creation. It is determined, therefore, as a matter of ultimate fact, that Innovative's bid did not strictly conform to the plain language of Special Condition No. 11. Like Innovative, Expert is a family-owned business. Founded in 1985 by Philip Simeone, Expert was incorporated in 1992. Though Expert clearly possesses the length of experience for which Special Condition No. 11 called, Expert failed in its Bidder Profile to provide three references "from jobs completed in each of the past three years," as instructed in paragraph 12 of the ITB's Section 7, Attachment 1. Instead, Expert gave two references from jobs completed in 2006 plus another from a job completed in 2004. Expert's bid did not contain a reference from a job completed in 2005. Expert contends that the School Board should have rejected Innovative's bid as materially nonresponsive (for lacking the requisite five years' experience) and awarded the contract to Expert as the lowest responsive bidder. The School Board and Innovative take the position that the School Board's decision to treat Innovative's bid as responsive was not clearly erroneous, arbitrary, or capricious. Turning the tables, the School Board and Innovative argue that Expert's own bid deviated from Special Condition No. 11, in that Expert failed to provide a reference from a job completed in 2005.2 Yet both assert that "it was reasonable for [the School Board] to waive the requirement of the Bidder Profile form that one . . . reference[] be [from] a job completed in the year 2005." Somewhat inconsistently, however, Innovative argues further that Expert's "bid proposal cannot be sustained"——evidently due to its material nonresponsiveness. This apparent inconsistency follows from Innovative's attempt to play down its alternative position, which is that if "a contrary conclusion [had] been reached as to [Innovative's] experience"—— meaning that if the School Board had chosen not to waive any irregularity concerning Innovative's length of corporate experience——then the "same analysis would apply to" Expert—— meaning that Expert's bid too should have been disqualified. Thus, even though Innovative maintains that the School Board reasonably waived any irregularities in Expert's bid, Innovative is unwilling to concede that the School Board did not err in determining that Expert's bid was responsive, evidently out of concern that such an admission might compromise its fallback position. Innovative's bottom line is that if Innovative's bid were to be disqualified as materially nonresponsive, then Expert's bid would need to be rejected, too.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board enter a Final Order that (a) declares Innovative's bid to be materially nonresponsive and, accordingly, rescinds the proposed award to Innovative; and (b) declares Expert's bid to be materially nonresponsive and, accordingly, rejects the same. Because the choice of remedies for invalid procurement actions is ultimately within the agency's discretion, the undersigned declines to make a recommendation as to whether the School Board should award the contract to All County (which was the putative "second alternate") or reject all bids and start over. DONE AND ENTERED this 19th day of March, 2007, in Tallahassee, Leon County, Florida. S JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2007.

Florida Laws (2) 120.569120.57
# 5
PIONEER CONTRACTING, INC. vs BROWARD COMMUNITY COLLEGE, 90-002862BID (1990)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida May 09, 1990 Number: 90-002862BID Latest Update: Jun. 29, 1990

Findings Of Fact On February 28, 1990, Respondent issued an invitation to bid (ITB) on a construction project referred to as Florida Atlantic University Modulars. The ITB required a base bid and bids on five alternates to the base project. Each bidder was instructed that it must bid on the base project and on each alternate for its bid proposal to be considered responsive. On March 19, 1990, Addendum 1 to the ITB was issued to all prospective bidders. This was an informational addendum and advised the date, time, and location of the posting of the award recommendation. Addendum 1 was not required to be returned by the bidder as a part of the response to the ITB. On March 21, 1990, Addendum 2 to the ITB was issued to all prospective bidders. This was also an informational addendum and advised as to a non- mandatory, pre-bid conference to be held March 27, 1990. Addendum 2 was not required to be returned by the bidder as a part of the response to the ITB. On March 30, 1990, Addendum 3 to the ITB was issued to all prospective bidders. This addendum advised that the date and time for the bid opening had been changed to April 9, 1990, at 2:00 p.m. Addendum 3 also contained modifications, explanations and corrections to the original drawings and specifications which impacted the cost and scope of the project. Immediately above the signature line on the cover page of Addendum 3 was the following: This document must be returned in it's [sic] entirety with the bid. Please sign below to verify that you have read and understand all the changes. Item 2 on page ADD-1 of Addendum 3 required each bidder to submit its per unit price structure with its response to the ITB and provided, in pertinent part, as follows: ... The unit price shall not be included in Base Bid. Submit a separate sheet with bid package. The following instructions are given in Paragraph 1(c) of the Instructions to Bidder: NO ERASURES ARE PERMITTED. If a correction is necessary, draw a single line through the entered figure and enter the corrected figure above it. Corrections must be initialed by the person signing the bid. Any illegible entries, pencil bids or corrections not initialed will not be tabulated. The instructions are repeated in Paragraph 1 of the General Conditions of the ITB: EXECUTION OF BID: ... No erasures are permitted. If a correction is necessary, draw a single line through the entered figure and enter the corrected figure above it. Corrections must be initialed by the person signing the bid. Any illegible entries, pencil bids, or corrections not initialed will not be tabulated. The following is contained as part of the Instructions to Bidder: Failure to complete, sign, seal and return the required documents will result in rejection of your bid. Any questions should be directed to Susan Kuzenka, (305) 761-7460, Purchasing Department, Broward Community College. (Emphasis in the original.) Paragraph 8 of the General Conditions portion of the bid package provided, in pertinent part, as follows: 8. AWARDS. As the best interest of Broward Community College may require, the right is reserved to reject any and all bids and to waive any irregularity in bids received ... On April 9, 1990, Petitioner submitted a bid to Respondent in response to the ITB. Petitioner had received the complete bid package, including all instructions and addenda to the bid package. At the pre-bid conference held March 27, 1990, an employee of Respondent emphasized to the attendees that it was necessary for the bidders to return Addendum 3 in its entirety. Petitioner did not attend the non-mandatory, pre-bid conference. The base bid submitted by Petitioner was $1,085,790.00. The base bid of Double E Construction Co., the next low bidder and the bidder to whom Respondent intends to award the contract, was $1,113,300.00. Petitioner's bid for each of the alternates was lower than that of Double E Construction Co. Petitioner failed to return the entire Addendum 3 as instructed. On page four of the bid package Petitioner acknowledged that it had received Addendum 3, and it signed and returned the cover sheet to Addendum 3 under the language quoted in the foregoing Paragraph 4. Respondent considered this an important requirement because it wanted to prevent a bidder from later claiming that it had not received Addendum 3 or that it had received information different than that contained in Addendum 3. Petitioner made a correction to its bid for Alternate Number 3 found on page 5 of 13 of Petitioner's bid. Petitioner's bid for this alternate was $88,000. In the space for the written amount of the bid, Petitioner's president inserted by hand the words "Eighty-eight Thousand". In the space for the numerical insertion of the bid he initially wrote the sum $125,000 (which was the amount of Petitioner's bid for Alternate 4). He struck through the figure $125,000 and wrote above the stricken figure the figure $88,000. He did not initial his change. Respondent has never accepted changes to price quotations which were not initialed because it is concerned that uninitialed corrections on bids may result in challenges to the integrity of the bid process and may expose its staff to charges of collusion from a disgruntled bidder. Pioneer did not include a unit price structure in its bid as required by Addendum 3. The unit price structure is an informational item that is not separately considered by Respondent to determine the lowest bidder on this project. On April 6, 1990, Petitioner's estimator on this bid telephoned Susan Kuzenka regarding the unit price structure sheet to inquire as to the format that should be followed in submitting the unit price structure. Ms. Kuzenka is named in the Instructions to Bidder as the person in Respondent's purchasing department to whom questions about the bid process should be directed. Petitioner's estimator was told that the unit prices would be required to be submitted by the successful bidder at the pre-construction meeting after the bids were opened, but that the unit price structure need not be submitted with the bid. Petitioner's president verified this information on April 9, 1990, prior to the bid opening, during a telephone conference with the project engineer employed by Respondent for this project. In reliance on the information that was supplied by Respondent's agents, Petitioner did not submit its unit price structure sheet with its bid. Following its examination of all bids, the bid of Petitioner was disqualified on three grounds. The first reason cited by Respondent was that Petitioner failed to return the entire Addendum (3) as required. The second reason was that Petitioner did not initial a correction to a quoted price figure. The third reason was that Petitioner did not include the unit price structure as required in Addendum (3). Petitioner thereafter timely protested its disqualification and the intended award of the contract to Double E Construction Co. Petitioner contends that the reasons cited by Respondent for its disqualification are minor irregularities that should be waived by Respondent. Additionally, Petitioner contends that the third reason should not disqualify it because Petitioner acted in reliance upon the instructions of Respondent's agents in not submitting the unit price structure along with its bid package. This proceeding followed.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent, Broward Community College, enter a final order which denies the bid protest of Petitioner, Pioneer Contracting, Inc. DONE AND ENTERED this 29th day of June, 1990, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 1990. APPENDIX TO THE RECOMMENDED ORDER The following rulings are made on the proposed findings of fact submitted on behalf of the Petitioners. The proposed findings of fact in paragraphs 1, 2. 6 and 7 are adopted in material part by the Recommended Order. The proposed findings of fact in paragraph 3 are rejected as being subordinate to the findings made in paragraph 10. The proposed findings of fact in paragraph 4 are adopted in part by the Recommended Order. The proposed findings in the last sentence of paragraph 4 are rejected as being unnecessary to the conclusions reached because of the clear instructions contained in Addendum 3. The proposed findings of fact in paragraph 5 are adopted in part by the Recommended Order. The proposed findings in the last two sentences of paragraph 5 are supported by the evidence, but are not adopted as findings of fact because they are unnecessary to the conclusions reached. All proposed findings of fact submitted on behalf of the Respondent are adopted in material part. Copies furnished: Eric L. Dauber, Esquire Beyer & Dauber Suite 5300 2101 W. Commercial Boulevard Ft. Lauderdale, Florida 33309 James D. Camp III, Counsel Broward Community College Fort Lauderdale Center 225 East Las Olas Blvd. Fort Lauderdale, Florida 33301 Janet Rickenbacker Director of Purchasing Broward Community College Fort Lauderdale Center 225 East Las Olas Blvd. Fort Lauderdale, Florida 33301

Florida Laws (2) 120.53120.57
# 6
ACE WASTE SERVICES, LLP vs BROWARD COUNTY SCHOOL BOARD, 12-000150BID (2012)
Division of Administrative Hearings, Florida Filed:Lauderdale Lakes, Florida Jan. 11, 2012 Number: 12-000150BID Latest Update: May 10, 2012

The Issue Whether in making a preliminary decision to award a contract for the subject services under Invitation to Bid No. 12-039T – Refuse Services (the ITB) Respondent School Board of Broward County, Florida (the School Board) acted contrary to a governing statute rule policy or project specification; and if so whether such misstep(s) was/were clearly erroneous, arbitrary or capricious, or contrary to competition. Specifically, Petitioner Ace Waste Services, LLC (Petitioner) challenges the determination that the bids submitted by the apparent low bidder, the apparent low second low bidder, and the apparent low third low bidder were responsive and responsible bids meeting the specifications contained in the ITB.

Findings Of Fact School Board Policy 3320 entitled "Purchasing Policies" is the agency's rule governing the purchasing of goods and services. On October 7, 2011, the School Board issued the ITB which was entitled "Refuse Services." On October 18, 2011, the School Board issued Addendum No. 1 to the ITB. The refuse services were to be provided to 58 district school sites, which were collectively referred to as Group 1. The Bidder Acknowledgement found at Section 1.0 of the ITB states in pertinent part as follows: I agree to complete and unconditional acceptance of this bid all appendices and contents of any Addenda released hereto; I agree to be bound to all specifications terms and conditions contained in this ITB . . .. I agree that this bid cannot be withdrawn within 90 days from due date. Section 3 of the ITB states as follows at General Condition 3(b): MISTAKES: Bidders are expected to examine the specifications delivery schedules bid prices and extensions and all instructions pertaining to supplies and services. Failure to do so will be at Bidder's risk. Section 3 of the ITB states as follows at General Condition 35: PROTESTING OF BID CONDITIONS/SPECIFICATIONS: Any person desiring to protest the conditions/specifications of this Bid/RFP or any Addenda subsequently released thereto shall file a notice of intent to protest in writing within 72 consecutive hours after electronic release of the competitive solicitation or Addendum and shall file a formal written protest with ten calendar days after the date the notice of protest was filed. Saturdays Sundays legal holidays or days during which the school district administration is closed shall be excluded in the computation of the 72 consecutive hours. If the tenth calendar day falls on a Saturday Sunday legal holiday or day during which the school district administration is closed the formal written protest must be received on or before 5:00 p.m. ET of the next calendar day that is not a Saturday Sunday legal holiday or days during which the school district administration is closed. Section 120.57(3)(b) Florida Statutes as currently enacted or as amended from time to time states that "The formal written protest shall state with particularity the facts and law upon which the protest is based." Failure to file a notice of protest or to file a formal written protest within the time prescribed by [section 120.57(3)(b)] or a failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under School Board Policy 3320 and [chapter 120]. The failure to post the bond required by School Board Policy 3320 Part VI within the time prescribed by School Board Policy 3320 Part VI as currently enacted or as amended from time to time shall constitute a waiver of proceedings under School Board Policy 3320 and [chapter 120]. Notices of protest formal written protests and the bonds required by School Board Policy 3320 Part VI shall be filed at the office of the Director of Supply Management and Logistics 7720 West Oakland Park Boulevard, Suite 323 Sunrise, Florida 33351 (fax 754-321-0936). Fax filing will not be acceptable for the filing of bonds required by School Board Policy 3320 Part VI. Section 3 of the ITB states as follows at General Condition 36: POSTING OF BID RECOMMENDATIONS/TABULATIONS: Any person who files an action protesting an intended decision shall post with the School Board at the time of filing the formal written protest a bond payable to the School Board of Broward County Florida in an amount equal to one percent (1%) of the Board's estimate of the total volume of the contract. The School Board shall provide the estimated contract amount to the vendor within 72 hours excluding Saturdays Sundays legal holidays and other days during which the School Board administration is closed of receipt of notice of intent to protest. The estimated contract amount shall be established on the award recommendation as the "contract award amount." The estimated contract amount is not subject to protest pursuant to [section 120.57(3)]. The bond shall be conditioned upon the payment of all costs which may be adjudged against the protestant in an Administrative Hearing in which the action is brought and in any subsequent appellate court proceeding. In lieu of a bond the School Board may accept a cashier's check official bank check or money order in the amount of the bond. If after completion of the Administrative Hearing process and any appellate court proceedings the School Board prevails the School Board shall recover all costs and charges which shall be included in the Final Order or judgment including charges made by the Division of Administrative Hearings but excluding attorney's fees. Upon payment of such costs and charges by the protestant the bond shall be returned. If the protestant prevails then the protestant shall recover from the Board all costs and charges which shall be included in the Final Order or judgment excluding attorney's fees. Section 3 of the ITB states as follows at Special Condition 1: INTRODUCTION AND SCOPE: The School Board of Broward County Florida (hereinafter referred to as "SBBC") desires bids on REFUSE SERVICES for solid waste removal as specified herein. Prices quoted shall include pick up at various schools departments and centers within Broward County Florida. Section 4 of the ITB states as follows at Special Condition 3: AWARD: In order to meet the needs of SBBC Bid shall be awarded in its entirety to one primary and one alternate responsive and responsible Bidders meeting specifications terms and conditions. The lowest Awardee shall be considered the primary vendor and should receive the largest volume of work. Therefore it is necessary to bid on every item in the group and all items (1-58) in the group must meet specifications in order to have the bid considered for award. Unit prices must be stated in the space provided on the Bid Summary Sheet. SBBC reserves the right to procure services from the alternate Awardee if: the lowest Bidder cannot comply with service requirements or specifications; in cases of emergency; it is in the best interest of SBBC. After award of this bid any Awardee who violates any specification term or condition of this bid can be found in default of its contract have its contract canceled be subject to the payment of liquidated damages and be removed from the bid list and not be eligible to do business with this School Board for two years as described in General Conditions 22 and 55. Section 4 of the ITB states as follows at Special Condition 7: ADDING OR DELETING SITES: SBBC may during the term of the contract add or delete service wholly or in part at any SBBC location. When seeking to add a location SBBC shall request a quote from both Awardees. The lowest Bidder shall receive an award for the additional location. If additional service is requested for an existing site already receiving service the current service provider will be contacted to provide a new quote based on the pricing formula submitted in response to this ITB or a subsequent quote. Section 4 of the ITB states as follows at Special Condition 11: RECEPTACLES: The Awardee shall furnish receptacles in good repair. . . .The Awardee shall furnish any and all equipment materials supplies and all other labor and personnel necessary for the performance of its obligations under this contract. Design of all equipment is subject to the approval of the Manager Energy Conservation Utility Management or his designee and must be replaced upon notification without additional cost to SBBC. DESCRIPTION: All receptacles used for solid waste referenced in Group 1 on the Bid Summary Sheets and the Tamarac location listed in Section 5 Additional Information unless otherwise indicated shall be provided by the Awardee at no additional cost. Bin receptacles shall be provided for SBBC use in the cubic yard capacities as indicated on the Bid Summary Sheets. Receptacles shall be bin-type units steel or plastic lift-up lids NO SIDE DOORS unless specifically requested for 8 cu. yd. fitted for automatic loading on casters where necessary for chute operations. (Receptacles not on casters must have a 6" – 12" clearance from ground to bottom of bin for easy cleaning underneath.) TWO AND THREE YARD CONTAINERS: It will be necessary for The Awardee to supply the two (2) and three (3) yard containers to hold compacted refuse at a ratio of approximately 4:1. These containers are designed for front-end loading. THESE UNITS ARE IDENTIFIED ON THE BID SUMMARY SHEET BY A SINGLE ASTERISK (*) NEXT TO THE CONTAINER SIZE. Section 4 of the ITB states as follows at Special Condition 20: SMALL IN-HOUSE COMPACTION UNITS(approximately two yards): The following schools have in-house compaction units which will need to be provided by the Awardee. Waste is compacted at an approximate ratio of 3:1. Collins Elementary Oakridge Elementary Sheridan Hills Elementary Section 4 of the ITB states as follows at Revised Special Condition 14: PRICING – ALL INCLUSIVE COST GROUP 1 ITEMS 1– 58: Bidder shall submit fixed monthly costs where indicated on the Bid Summary Sheets for each location based on 4.33 weeks per month. (This number is derived by dividing 52 weeks by 12 months). Monthly costs stated shall be an all-inclusive cost for providing receptacles refuse removal and disposal including but not limited to all necessary labor services material equipment taxes tariffs franchise fees maintenance and applicable fees. SBBC agrees to pay the Broward County Disposal Adjustment (tipping fees) in effect at the time. Increases to this fee will be paid as assessed by Broward County. Any decreases in these rates shall be passed on to SBBC as well. No bid specification protest was filed by any person concerning the original ITB or Addendum No. 1. Nine companies submitted timely responses to the ITB. Each bidder submitted a monthly bid and an annual bid. The School Board thereafter ranked the respective bids. Intervenor was the apparent low bidder with a monthly bid of $39,576 and an annual bid of $474,918.38. All Service was the apparent second low bidder with a monthly bid of $40,540.90 and an annual bid of $486,490.80. WSI was the apparent third low bidder with a monthly bid of $47,671.71 and an annual bid of $572,060.52. Petitioner was the apparent fourth low bidder with a monthly bid of $50,177.73 and an annual bid of $602,132.76. On November 2, 2011, the School Board's Purchasing Department posted the agency's intended recommendation for award of the ITB. The intended decision was (A) to award to Intervenor as the primary vendor for Group 1 (1 through 58); and (B) to award to All Service as the first alternate for Group 1 (1 through 58). On November 4, 2011, Petitioner timely filed its Notice of Protest with the School Board's Purchasing Department. On November 14, 2011, Petitioner timely filed its Formal Bid Protest with the School Board's Purchasing Department and delivered the required bid protest bond. The School Board formed a Bid Protest Committee that met with Petitioner on December 19, 2011, to consider Petitioner's formal written protest in accordance with section 120.57(3)(d)(1) and School Board Policy 3320. The parties were unable to resolve the protest by mutual agreement and the School Board sent Petitioner a notice of non-resolution of dispute. Section 1 of the ITB precludes a bidder from withdrawing its bid within 90 days of its submission to the School Board. At the time of the formal hearing 106 days had passed since the submission of bids. No bidder, including Intervenor, has indicated that it committed an error in calculating its prices submitted under the ITB or asked the School Board to excuse it from the prices it offered under the ITB. To the contrary, Intervenor's counsel represented at the formal hearing that Intervenor was standing by its bid. Generally, compacted waste is heavier and more expensive to dispose of than non-compacted waste. The ITB identifies the number and size (in cubic yards) of the receptacles to be placed at each location and the number of pick-ups per weeks to occur for each receptacle. The ITB also informs the bidders whether a receptacle was compacted or non-compacted. If compacted the ITB set forth the ratio of compaction. Bidders were also asked to bid a monthly cost and any applicable fees charged by the facility receiving the waste to arrive at total monthly cost for each receptacle to be furnished. The bidders were required to provide a total monthly bid for the services and a total annual bid for the services. The bidders were to use the information set forth in the ITB to calculate their bids. Petitioner asserts that the bids submitted by Intervenor, All Service, and WSI were not responsible bids because those bids failed to factor in the higher costs of disposing of waste that had been compacted. Petitioner contends that the reference to compaction ratios constitute specifications by the School Board to require all bidders to calculate their pricing utilizing the compaction ratios. Petitioner describes the referenced compaction ratios as "multipliers" that needed to be used by the bidders in calculating their prices for handling and disposing of compacted waste. Petitioner is seeking to impose its interpretation of the ITB as requiring each of the bidders to calculate its bid using the same pricing methodology that Petitioner employed. There is no ambiguity in the ITB, and there is no factual basis to conclude that all bidders were required to prepare their bids in the same fashion as Petitioner. There is nothing set forth in the ITB that required the School Board to interpret its reference to the compaction ratios as being a specification of a "multiplier" for pricing as opposed to a description of the capacity of the receptacles to be used at each of the school locations. At no point is the word "multiplier" used in the ITB to specify that the bidders were required to engage in mathematics involving multiplying their prices against some unit price the bidders were specifying in their bids. The ITB specifies the frequency with which the varying container sizes needed to be picked up at each of the 58 schools with the weight or volume of the container not being a factor in setting the specification of how often the container is to be picked up by the awardee. No adjustments were to be made to the prices paid by the School Board based on the weight of the container when removed. The School Board did not specify in the ITB that a bidder was required to charge the same monthly cost at each school for a similarly-sized refuse container nor did the School Board require different pricing for compacted waste as compared to non-compacted waste. Petitioner's assertion that the bidders were required to use those ratios as a multiplier when bidding on the cost of disposing of compacted waste is rejected as being contrary to the plain language of the ITB. The compaction ratios were provided to the bidders as information only. There is no requirement that a bidder use a particular methodology in determining its bid amounts.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that the School Board of Broward County Florida enter a Final Order that adopts the findings of fact and conclusions of law contained herein, dismisses the protest filed by Petitioner Ace Waste Services LLC, and upholds the award of the procurement to Choice as primary awardee and to All Service as alternate awardee. DONE AND ENTERED this 20th day of March 2012, in Tallahassee Leon County Florida. S Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of March 2012.

Florida Laws (3) 120.569120.57287.012
# 7
FAIRCHILD CORPORATION vs DEPARTMENT OF TRANSPORTATION, 90-003122BID (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 23, 1990 Number: 90-003122BID Latest Update: Jul. 30, 1990

Findings Of Fact State Project No. 46090-3511 (the project) is for construction of the West Bay Bridge on State Road 79 in Bay County, Florida. Competitive bids on the project were solicited in February, 1990. The bid letting on the project was held in March, 1990. The Petitioner, Fairchild, the Hardaway Company and ten other contractors bid on the project. The Hardaway Company submitted the lowest bid on the project in the amount of $9,487,258.17. Fairchild submitted the next lowest bid in the amount of $9,835,279.34. Divergent Unit Prices and Imbalances. The part of the Hardaway Company's bid relating to construction of the foundation for the approaches to the bridge (the "structural bid") is obviously below reasonable cost in several respects. The contract specifications require the use of sand fill, shell fill, reinforcement grid (biaxial type 2), and Class III (seal) concrete. The Hardaway Company's unit prices for these items were, respectively, one dollar per cubic yard for the sand fill, fifty cents per cubic yard for the shell fill, twenty-five cents per square yard for the reinforcement grid, and ten cents per cubic yard for the Class III seal concrete. As a result, the Hardaway Company's bid for these items is obviously significantly below reasonable cost and approximately $95,500 below what Fairchild bid for the same portion of the contract. In contrast to the sand fill, shell fill, reinforcement grid and Class III concrete, the Hardaway Company's bid on some of the other parts of the structural bid were relatively high. The reinforcing steel for the substructure (Item 415-1-5) was bid at approximately twice reasonable cost (80 a pound versus, e.g., 42 in Fairchild's bid), resulting in $609,936.80 attributable to that part of the bid versus, e.g., $320,216.82 for Fairchild. The statistical average (the DOT's so-called "average 2") for the other serious bidders under this item also was 42 a pound. The Hardaway Company also bid obviously in excess of reasonable cost for the lump sum item of mobilization for pile installation--$600,000 versus $125,000 in Fairchild's bid and less in the bids of several of the others bidders. (The statistical average for the other serious bidders under this item was $225,000.) But the Hardaway Company bid only $60,000 for the lump sum item for removal of existing structures (versus $160,000 in Fairchild's bid) and only $30,000 for the lump sum item for removal and disposal of fender system (versus $110,000 in Fairchild's bid). The portion of the Hardaway Company's bid attributable to mobilization for the roadway work is significantly less than the Fairchild bid under this item ($200,000 versus $375,000) and partially counterbalances the excess in the part of the Hardaway bid for mobilization for the pile installation. The portion of the Hardaway Company's bid attributable to clearing and grubbing also was high, at $20,000 an acre versus a statistical average of $4,200 an acre for the other serious bidders, resulting in $216,000 for the Hardaway Company bid versus, e.g., $32,400 for the Fairchild bid and the $45,360 statistical average. DOT Review Procedures. Section 2-6 of the DOT's Standard Specifications applicable to the project provides: 2-6 Rejection of Irregular Proposals. A proposal will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, additions not called for, conditioinal or unauthorized alternate bids, or irregularities of any kind; also if the unit prices are obviously unbalanced, either in excess of or below the reasonable cost analysis values. The DOT is in the process of formulating a policy on the use of the Technical Review Committee in the bidding process. A proposed procedure has been developed, which has not yet been made final and has not yet been signed by the Secretary of the DOT, under which the Technical Review Committee would review the low bid on each contract, among other things not applicable to this case, for "any significant irregularities in unit bid prices" and for "unbalanced bidding." The DOT has not yet defined "any significant irregularities in unit bid prices" or "unbalanced bidding" for purposes of defining the event that triggers review by the Technical Review Committee. The DOT Director of the Office of Construction, Robert Buser, is of the opinion that the unit prices the Hardaway Company bid for the sand fill, the shell fill, the reinforcement grid and the Class III seal concrete are "significant irregularities in unit bid prices." On the other hand, the DOT's Preliminary Estimates Engineer, Robert Griner, who, unlike Buser, is a member of both the Technical Review Committee and its Preliminary Technical Subcommittee, and is of the opinion that the Hardaway bid for the sand fill, the shell fill, the reinforcement grid and the Class III (seal) concrete are "mathematical imbalances," not "significant irregularities in unit bid prices," which he would define as bids that omit a unit price, whose numerical values do not match words used to express the values, or that are not signed. Under Griner's approach, which was followed in this case, the Preliminary Technical Subcommittee looks at "mathematical imbalances" to see if they are "material imbalances." If the Preliminary Technical Subcommittee decides that it is not a "material imbalance," it simply reports this finding at the outset of the meeting of the Technical Review Committee, which accepts the finding and does not itself consider the matter any further. Only if the Preliminary Technical Subcommittee reports a "material imbalance" does the Technical Review Committee further consider the question. Front-end Bidding. Under the DOT contract for the project, like other items in the specifications, mobilization and land clearing and grubbing are paid in installments as the work proceeds. But, unlike the other items, all of the portion of the contract attributable to mobilization and land clearing and grubbing is paid by the time the entire project is half completed. Similarly, a contractor is paid for reinforcement steel (substructure) when it is delivered to the site. As a result, by shifting dollars in a bid to these "front-end," lump sum items, a contractor can manipulate the bid process and contract to reasonably insure himself of early payment of these inflated items regardless what may happen to the project later. In analyzing these front-end, lump sum items, Griner treated them (along with the unreasonably low bids on the sand fill, shell fill, reinforcement grids and C III seal concrete) as "mathematical imbalances." Following the guidance of a Federal Highway Administration (FHWA) memorandum, dated May 16, 1988, on the subject of "Bid Analysis and Unbalanced Bids," Griner analyzed the Hardaway bid to be sure it would not be susceptible to cost overruns (it was not) and to be sure the quantities were correctly estimated (they were). He also analyzed the additional cost to the DOT of paying the Hardaway Company early (by the half way point of the project) for the inflated front-end items to determine whether the "mathematical" imbalance was "material," i.e., whether "the mathematically imbalanced bid will result in the lowest ultimate cost to the Government." Based on a twelve percent interest rate, Griner calculated that the inflated front-end items would cost the DOT approximately an additional $98,000, 1/ still much less than the difference between the low Hardaway bid and any other bid. Based on this calculation, Griner concluded that the "mathematical imbalance" in the Hardaway bid was not a "material imbalance" and did not require the award of the bid to Fairchild or one of the other bidders. Griner overlooked and did not apply another portion of the method of analysis in the FHWA memorandum on "Bid Analysis and Unbalanced Bids" that states: There are numerous reasons why a bidder may want to unbalance his/her bid on a contract. One reason is to get more money at the beginning of the project. The bidder does this by overpricing the work done early in the project. This is called "front loading" the contract. The leading case in the "front loading" area is Matter of: Riverport Industries, 64 Comp. Gen. 441 (1985). Here the Comptroller General held that if the bid is front loaded, regardless if it is the lowest bid, it "should be viewed as materially unbalanced since acceptance of the bid would result in the same evils as an advance payment. An advance payment is prohibited by law." The "front loading" may also be materially unbalanced due to the cost of money that must be paid out early versus over the normal construction fo the project. Under the Hardaway Company bid, the pile mobilization, the land clearing and grubbing, and the reinforcement steel (substructure) parts of the bid are "front-ended." 2/ Under the method of analysis suggested by the FHWA memorandum, the Hardaway Company would be paid approximately $428,000 in "advance payments" under these two items if it is awarded the contract. Approximately $375,000 in pile mobilization, $183,600 in land clearing and grubbing, and $289,700 in the reinforcement steel were shifted to these front- end items from the unbalanced sand fill, shell fill, reinforcement grid, and Class III (seal) concrete items. These dollars The shifted dollars are estimated by taking the difference between the statistical average for these items and the Hardaway bid on them. Since roiughly half of the shifted dollars would be paid earlier than they would be paid if they were bid under the sand fill, shell fill, reinforcement grid and Class III (seal) concrete items, the amount of "advance payment," under the FHWA analysis would be approximately $428,000. Griner did not explain why he only followed part, but not all, of the method of analysis suggested by the FHWA memorandum, other than to say he overlooked it. But he also testified that it is common practice for contractors to submit mathematically unbalanced bids, and the DOT always analyzes them the way he did in this case. Indeed, in the March, 1990, bid letting, Griner found "mathematical imbalances" in 21 of the 29 low bids but no "material imbalances." The Fairchild bid also contains "mathematical imbalances." It also "front-ends" several items. The total dollar value of the "front-ending" in the Fairchild bid (including roadway mobilization) closely approximates that found in the Hardaway bid and, under the FHWA analysis, would result in approximately the same amount of advance payment. Under Section 101-2.2 of the DOT's Standard Specifications for this project, contractors are limited to a maximum of ten percent of the total contract for mobilization. The Hardaway Company's total mobilization bid is within the maximum under the specifications. Notwithstanding the imbalances in the Hardaway bid, and the so-called "advance payments" that would result from the "front-ending" in the Hardaway bid, the Hardaway bid remains the lowest and best bid on the project, and it is the best interest of the DOT and the public to award the contract to the Hardaway Company. Even if the Hardaway Company had bid the sand fill, shell fill, reinforcement grid, and Class III (seal) concrete items exactly as Fairchild did, Hardaway still would be low bidder. "Value Engineering" and Alleged Alternative or Contingent Bidding. Inferences reasonably could be drawn from the evidence that the Hardaway Company may intend to propose to the DOT that the approach to the bridge be re-engineered so as to eliminate the need for the sand fill, the shell fill, the reinforcement grid and the C III (seal) concrete. If the DOT accepts such a proposal, the contract between the DOT and the Hardaway Company would have to be modified. If the re-engineered project were to allow the Hardaway Company to do the job for less than its bid price, half (or, if the proposal is innovative or unique, up to 80%) of the savings would be paid to the Hardaway Company under what the DOT calls "value engineering." Under DOT procedures, "value engineering" proposals are not made or evaluated until after the original contract is signed with the successful bidder. It is not an alternative bid or a contingent bid.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Respondent, the Department of Transportation, enter a final order dismissing the bid protest filed by W. R. Fairchild Construction Company, Ltd., and awarding State Project No. 46090-3511 to the Hardaway Company. RECOMMENDED this 30th day of July, 1990, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 1990.

Florida Laws (1) 120.57
# 8
WALES INDUSTRIES, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-003317BID (1987)
Division of Administrative Hearings, Florida Number: 87-003317BID Latest Update: Oct. 14, 1987

Findings Of Fact Since 1984 Respondent Department of Health and Rehabilitative Services (hereinafter "the Department") has served as the distributing agency for United States Department of Agriculture surplus foods to be distributed to needy people in the State of Florida. These foods are butter, processed cheese, non-fat dry milk, cornmeal, rice, flour, and honey. The Department contracts with companies in the food storage and distribution business-to store the surplus food and distribute it to emergency feeding organizations. The emergency feeding organizations then distribute the food to needy persons. Each year the Department enters into contracts for various regions within the State. Petitioner Wales Industries, Inc. (hereinafter "Wales"), Intervenor Mid-Florida Freezer Warehouses, Ltd. (hereinafter "Mid-Florida"); and Gulf Cargo Services, Inc. (hereinafter "Gulf Cargo"); have all been awarded contracts with the Department over the years for storage and distribution of the surplus foods in the various regions of the State. On or about June 12, 1987, the Department issued an Invitation for Bid (hereinafter "IFB 87-1") which advised prospective bidders that sealed bids would be opened on July 10, 1987 for a contract for the storage and distribution of the surplus foods for the period of October 1, 1987 to September 30, 1988. A bidder under IFB 87-1 would be required to store the above-described commodities in dry, chilled, and frozen storage. The provider must also be able to ship the commodities under dry, chilled, and frozen conditions to emergency feeding organizations throughout the state. The bid evaluation criteria set forth in Paragraph E of IFB 87-1 provide, in part, as follows: c. The bid will be awarded to the Bidder submitting the lowest delivered price per CWT for dry, cold, and frozen donated foods inclusive for each Region, combination of regions, or statewide as bid. The bid price for pick-up at the Provider's warehouse is informational, but is not a consideration in award of the bid. Paragraph numbered eight of the General Conditions of IFB 87-1 notifies actual or prospective bidders who dispute the reasonableness, necessity, or competitiveness of the terms and conditions therein or of the bid selection or contract award recommendation that they must file a protest within the time prescribed in section 120.53(5), Florida Statutes, or be deemed to have waived their right to do so. IFB 87-1 included an estimate of the number of cases and weights of commodities to be handled by a provider per region. This information was characterized as "History of 1986-1987 Cases and Pounds" but this characterization was amended to "Estimates of 1986-1987 Cases and Pounds" by letter of amendment dated June 18, 1987. IFB 87-1 provides elsewhere that these distribution rates are subject to change. By further letter of amendment dated June 23, 1987, the Department notified prospective bidders that bids based upon combinations of regions were acceptable, and revised bid sheets with blanks for the dollar bid for each of the three types of commodities were provided to prospective bidders with the letter of amendment. On June 26; 1987; the Department conducted a bidder's conference for IFB 87-1. Representatives from Wales and Mid-Florida attended the bidder's conference and asked questions of the Department's representatives concerning IFB 87-1. Wales, Mid-Florida, and Gulf Cargo (among others) submitted sealed bids by the deadline at 2:00 p.m., July 10, 1987. Gulf Cargo submitted a bid for Region I only. Wales submitted individual bids for each of Regions I through VI. Mid- Florida submitted individual bids for Regions II through VI and two bids combining various regions except for Region I. Gulf Cargo was awarded a contract for Region I, and Mid-Florida was awarded a contract based on its combined bid for Regions II through VI. The bid awards were announced on July 17, 1987. Wales' notice of intent to file formal written protest is dated July 23, 1987. Wales filed its formal written protest on July 31, 1987. The volume and type of surplus foods distributed through the program is solely dependent upon the commodities made available to the Department by the federal government. There is no guarantee that the State of Florida will receive any particular amount or mix of the commodities distributed through the program. Therefore, the data supplied by the Department to prospective bidders regarding the volume and type of surplus foods to be stored and distributed is based upon actual historical data and is the most accurate data available. Neither IFB 87-1 nor the contracts for previous years under this program guarantee the successful bidder any amount of revenue or any volume of goods to be handled. The method of bid evaluation that was set forth in IFB 87-1, which was emphasized at the bidder's conference, and which was memorialized in the Department's June 29, 1987 listing of questions and answers from the bidder's conference and sent to all prospective bidders was the same the Department would average the bid prices for each type of commodity, i.e., frozen, dry and chilled. The averaging method utilized results in the lowest cost accruing to Use State and actually resulted in a lower bid price for the 1987-88 contracts than the 1986-87 contracts. The actual cost to a provider of storing and transporting frozen, chilled, and dried commodities varies according to the facilities and equipment owned by each prospective bidder. The averaging method utilized by the Department for IFB 87-1 permits bidders to develop competitive bids based upon the bidder's individual costs, storage facilities and equipment; and the bidder's anticipation of the volumes and types of commodities likely to be received from the federal government. The information provided in IFB 87-1 as to drop sites for delivery by the providers was sufficient for prospective bidders to develop competitive bids. The requirement contained in IFB 87-1 that the provider would be responsible for providing off-loading facilities in Dade, Broward, and Duval counties did not prevent the formulation of competitive bids.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Lawn it is, RECOMMENDED that a Final Order be entered dismissing the bid protest filed by Wales Industries Inc.; awarding the 1987-88 contract for Region I to Gulf Cargo Services, Inc.; and awarding the 1987-88 contract for Regions II-VI to Mid-Florida Freezer Warehouses Ltd. DONE and RECOMMENDED this 14th day of October, 1987, at Tallahassee, Florida. LINDA M. RIGOT Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-3317BID The Department's proposed findings of fact numbered 1-3 and 7 have been adopted either verbatim or in substance in this Recommended Order. However, the Department's proposed findings of fact numbered 4-6 have been rejected as not constituting findings of fact but rather as constituting argument of counsel or conclusions of law. Mid-Florida's proposed findings of fact numbered 1-20 have been adopted either verbatim or in substance in this Recommended Order. Wales' proposed findings of fact numbered 1-4 and 9 have been adopted either verbatim or in substance in this Recommended Order. However, Wales' proposed findings of fact numbered 12-15 have been rejected as being contrary to the evidence in this cause; Wales' proposed finding of fact numbered 16 has been rejected as not being supported by the evidence in this cause; and Wales' proposed findings of fact numbered 5-8, 10, and 11 have been rejected as being subordinate to the issues under consideration herein. COPIES FURNISHED: Sam Powers Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Martin R. Dix Esquire Barnett Bank Building Suite 800 315 South Calhoun Street Tallahassee, Florida 32301 Robert Powell, Esquire Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee Florida 32399-0700 Harold T. Bistline Esquire Building 1, Suite 10 1970 Michigan Avenue Cocoa, Florida 32922 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (2) 120.53120.57
# 9
PRO TECH DATA vs. OFFICE SYSTEMS CONSULTANTS, 85-001847BID (1985)
Division of Administrative Hearings, Florida Number: 85-001847BID Latest Update: Aug. 16, 1985

Findings Of Fact On April 1, 1985, Respondent, Florida Department of Law Enforcement (FDLE), gave notice to thirty vendors that it would receive competitive sealed bids on Bid Number 84-67 for the following commodities: eight computer binder cabinets 36x18 5/8x71 Putty/Black, three hundred single point binder hooks, six hundred 10" steel reinforced binder posts. The bids were to be filed in Tallahassee, Florida, no later than 11:00 a.m., April 16, 1985. The Invitation to Bid included General Conditions, Special Conditions and technical specifications describing the dimensions and capacities of the desired equipment. Of special significance was the technical specification that the single point binder hooks be "[c]apable of supporting up to 6 inches of llx14 7/8 20 lb. computer paper." Paragraph 6 of the General Conditions provides as follows: 6. MANUFACTURERS' NAMES AND APPROVED EQUIVALENTS: Any manufacturers' names, trade names, brand names, information and/or catalog numbers listed in a specification are for information and not intended to limit competition. The bidder may offer any brand for which he is an authorized representative, which meets or exceeds the specification for any items(s) [sic]. If bids are based on equivalent products, indicate on the bid form the manufacturer's name and number. Bidder shall submit with his bid, cuts, sketches and descriptive literature and or complete specifications. Reference to literature submitted with a previous bid will not satisfy this provision. The bidder shall also explain in detail the reason(s) why the proposed equivalent will meet the specifications and not be considered an exception thereto. The State of Florida reserves the right to determine acceptance of items(s) [sic] as an approved equivalent. Bids which do not comply with these requirements are subject to rejection. Bids lacking any written indication of intent to bid an alternate brand will be received and considered in complete compliance with the specifications as listed on the bid form. The purchaser is to be notified of any proposed changes in (a) materials used, (b) manufacturing process, or (c) construction. However, changes shall not be binding upon the State unless evidenced by a Change Notice issued and signed by the purchaser. (Emphasis added.) Paragraph 7 of the General Conditions imposed the following duty upon all bidders: 7. INTERPRETATIONS: Any questions concerning conditions and specifications shall be directed in writing to this office for receipt no later than ten (10) days prior to the bid opening. Inquiries must reference the date of bid opening. No interpretation shall be considered binding unless provided in writing by the State of Florida in response to requests in full compliance with this provision. Of the thirty vendors given an opportunity to submit bids, only two did so. They were Petitioner, Pro Tech Data (PTD or Petitioner), and Office Systems Consultants (OSC). Their bids were in the amounts of $4,645 and $5,244, respectively. After reviewing the bids, and consulting with both bidders, the director of the agency's Division of Criminal Justice Information Systems, Mark Scharein, determined that Petitioner's bid was nonresponsive for not meeting specifications and was accordingly rejected. The bid was then awarded to OSC, the second lowest bidder, on May 3, 1985. That precipitated the instant proceeding. In its bid response, PTD listed "Dennison Monarch #7830" as manufacturer and model number for the single point binder hooks. Petitioner also submitted a Dennison Monarch catalogue with its bid response. When FDLE examined the catalogue to ascertain the specifications of the hooks, it found no model number 7830. Indeed, the closest item matching this number was model number 7830-22 which referred to shelf supports, an item not solicited in the bid proposal. After consulting with PTD, it was determined that the use of model number 7830 was in error, and that Petitioner had intended to use model number 7802-30. Its request to amend the bid response was denied. Even if the bid proposal had contained the correct model number, the binder hooks in model number 7802-30 did not meet specifications. The product description of that model carries the following limitation: "Can accommodate a few sheets of paper or a stack of data 4" thick." In addition, at hearing PTD's representative conceded that the manufacturer did not recommend hanging six inches of paper from that model binder hook. This was inconsistent with FDLE's specific requirement that such hooks be "[c]apable of supporting up to 6 inches of . . . computer paper." OCS submitted product designations which conformed in all material respects to the specifications and conditions required by the bid proposal. Although PTD suggests that OCS's binder hooks do not support six inches of computer paper, .OCS's bid response reflects that they do, and there was no evidence to contradict this representation.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Bid No. 84-67 be awarded to Office Systems Consultants, and that Petitioner's bid protest be DENIED. DONE and ORDERED this 16th day of August, 1985, in Tallahassee, Florida. DONALD R. ALEXANDER, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, FL 32301 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this l6th day of August, 1985.

Florida Laws (2) 120.53120.57
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer