BAY PLAZA I vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-005325BID (1988)
Division of Administrative Hearings, Florida Number: 88-005325BID Latest Update: Mar. 15, 1989

Findings Of Fact In May, 1987, the Department contracted with B.P. Associates, then owner of the Bay Plaza facility, to lease space at that facility located in Brandon, Florida. A part of the bid conditions required extensive physical renovations of the facility which were being supervised by Coldwell Banker, a real estate brokerage and management firm serving as property manager and construction supervisor. Construction was begun in December, 1987. Mr. Burrwood Yost was hired by the Department as its Facilities Services Manager for the Tampa Region in March, 1988. Mr. Yost soon became dissatisfied with the work being accomplished under Coldwell Banker's supervision and the company's responsiveness to maintenance problems arising at the facility, which the Department had asked to be corrected. As a result of this dissatisfaction with Coldwell Banker's demonstrated inability to properly perform, Mr. Yost recommended that the bid award to B.P. Associates be withdrawn and that the procurement be relet. On June 17, 1988, the bid award to B.P. Associates was withdrawn. On June 1, 1988, however, shortly before the withdrawal of the prior award, ownership of Bay Plaza was transferred to Northern which immediately substituted a new property manager and construction supervisor for Coldwell Banker. The new management firm was Grubb and Ellis, which took over on September 1, 1988. New bids were solicited by invitation to bid on July 15, 1988 which called for approximately 27,122 square feet of leased space to be available by April 1, 1989. The bid invitation clearly stated that "all bids will be evaluated based on the award factors enumerated in the bid submittal form." This form outlined the bid procedure, listing award factors to be considered and specifying the precise amount of weight each factor would be given. Past performance was not listed as a basis for evaluation on the bid invitation form and Mr. Yost admits that past performance was not to be considered as a factor. Five bids were received of which three were deemed responsive. These were Bidder C, Northern; Bidder D, Turner Development Corporation; and Bidder E, Alderwood B. Northern's bid was the lowest of the three responsive bids by more than $2.00 per square foot over the life of the lease. Alderwood was the second lowest. Each of the bids was evaluated by a bid evaluation committee consisting of seven representatives from the various Department program offices that were to occupy the leased space. The chairman of the committee, Ms. Chipman, was placed thereon at the request of Mr. Yost, and was actually a supernumerary since the committee a originally constituted by Mr. Akridge, the Department's Facilities Services Manager Assistant in Tampa, was made up of only six members. A 100 point bid evaluation scale, which was included in the bid package furnished to each bidder, was to be utilized by the committee to evaluate each bid. Prior to beginning their evaluation duties, the committee members were walked through each proposed site, and in the briefing given by Department authorities, specifically advised that prior performance was not a criteria and should not be considered. When the committee members' evaluations were computed, Northern's bid for Bay Plaza received a score of 83.5. Alderwood's bid for its property was given a score of 87.9. Each evaluator rated Alderwood highest and the evaluation committee concluded that, consistent with the overall criteria which called for the lease to be awarded to the lowest and best bid that met program needs, Alderwood's bid was lowest and best. Consequently, the committee recommended that Alderwood receive the award even though Northern's bid for Bay Plaza was lowest in terms of total dollars involved. The bids were evaluated based on three major evaluation criteria. These were Fiscal Costs, Location, and Facility. The Fiscal Cost element was further broken down into three subcategories; rental rates, renewal rates, and moving costs. Northern received 25 points of the 25 available for rental rates because it offered the lowest rental rate. When reduced to present value, Northern's bid for the entire term of the lease was more than $600,000.00 below the next lowest bid and for the first nine years of the lease alone, was $336,799.00 lower. Alderwood was awarded 21.5 points for its rental rate submission. In the area of renewal rates, Northern was awarded 7 of 7 possible points and Alderwood was awarded 2. These awards were not computed by the committee or assigned by them. Instead, the scores were computed on the basis of a present value analysis accomplished in Tallahassee and were entered on the score sheet by Mr. Akridge, the Department's local supervisor for this procurement. Considering the moving costs, however, Alderwood outscored Northern by 3 to 2.7 points. This difference was attributed to an additional moving cost for the Bay Plaza site as opposed to the one move cost if the Alderwood site were chosen. To have the rehabilitation work done at Bay Plaza would have required a move to another location while the work was being done and another move back when it was finished. In the Alderwood case, the Department would move only once. The "Location" criteria also had three subcategories for consideration. They were, general area, in which both bidders received the maximum 10 points; public transportation at 5 points, and environmental factors at 15 points. In the area of public transportation, Alderwood received the full 5 points with Northern receiving 1.1. Department personnel considered the fact that bus service was available through the site at Alderwood, the stop being within wheelchair and walking distance of the building, as being more significant and of higher value than the proposed bus service envisioned in 1989 for Northern's facility which, at the time of the bidding, was not served by a bus. Bus company officials stated an intention to provide bus service to the area in the future. The environmental factors subcategory related to the physical characteristics of the building and the surrounding area and the effect of these factors on the "efficient and economical conduct of Department operations." In this subcategory, Alderwood received a higher score than did Northern's building because the committee was of the opinion the Alderwood facility would be more energy efficient. Current Department occupants of Northern's facility at Bay Plaza contended that because of the large expanses of glass, there would be more heat generated in the building in the afternoon. No official energy efficiency assessment was done of either building because both occupied less than 20,000 square feet. Consequently, the committee analysis here was based on the experience of some committee members and was neither scientific nor professional. The committee was also concerned with the potential for theft because of the large amounts of glass and was of the opinion that the Bay Plaza layout was "confusing." Neither of these judgements carry much weight, however. Another environmental factor considered by the committee concerned the parking availability at each facility. The committee was of the opinion that the layout at Northern's facility was not good. It was long and extended. Staff also was concerned that the several access doors to the Northern facility could cause clients to become confused. More important, however, was their concern that due to the several entrances to the building, it would be difficult to control entry. Alderwood's facility, on the other hand, provided a central entrance for each building and it was felt this would allow tighter security control for the safety of the building occupants. The committee was also impressed by the fact that Alderwood's facility provided a play area for clients' children, and felt that Alderwood's landscaping was more appealing. The rating of Alderwood's handicap access as high, is important. Turning to the third major bid criterion, Facility, Northern's facility was awarded 16.3 points of a possible 20 for layout/utilization while Alderwood's was awarded 18.7 points. For the subcategory, single building, Northern's facility received 6.7 points out a possible 10 and Alderwood's facility was awarded 8.1. As for the final subcategory, street level, both facilities were awarded 5 points. As for layout/utilization, one committee member, Chipman, awarded Alderwood more points because it provided a separate entrance for each program, because it provided covered walkways for weather protection, and because there was less of a "maze" effect in that facility due to its square configuration. This last factor was of concern to other committee members who rejected the idea of clients having to walk through offices to get to the different programs. The wider hallways and better access for handicapped, as was stated previously, were also considered positive factors for Alderwood. Neither facility offered the single building which was a desired characteristic, Mr. Akridge, however, advised the committee in his preparatory briefing that since neither bidder offered a single building facility, the committee could award points on the layout of the multi-unit facility based on the relationship of the individual components to each other. At least two committee members, Chipman and Collins, rated Alderwood's facility better and awarded more points because they felt the layout of that facility allowed a more advantageous grouping of programs within the units. There is substantial evidence, however, that the information furnished the committee was neither complete nor in all cases accurate. Once the committee completed its evaluation, Mr. Akridge tabulated the scores and prepared a "request for bid award" letter dated September 21, 1988 for transmittal to Department officials in Tallahassee. The letter was prepared to report the committee recommendation for the award to Alderwood and to explain why the recommendation was made to award to that bidder as opposed to the low bidder. Review of this letter clearly reflects that Mr. Akridge and the committee were concerned with past performance at the Bay Plaza facility. When Mr. George Smith, a senior management analyst for the Department in Tallahassee received Mr. Akridge's letter, recognizing the possible appearance of consideration of an improper factor, he requested that Mr. Akridge seek and provide more justification for the committee's findings. While Mr. Smith contends he did this because of his concern over costs, the fact remains that Akridge's letter of September 21 did mention past performance which was an invalid consideration. Mr. Smith asked Mr. Akridge to prepare another memo giving additional information about such things as bus service, the difference in rental rates, the building layouts and locations and those factors which the users of the proposed facility, those individuals who were on the committee from the using organization, felt were important to them in the effective accomplishment of their jobs. Mr. Smith clearly indicated he recognized that past performance is not a valid point for consideration and that it would play no part in his analysis of the bids preparatory to making final recommendation for award. In response to Mr. Smith's direction, Mr. Akridge prepared another memorandum dated September 30, 1988. Though by far the greatest portion of this memo is a detailed comparison of the two facilities and the concerns of the committee regarding them, the first paragraph, (1 A) refers to the failure of the former leasing agent to obtain state fire marshal approval and a reference to concern that in light of the fact that Northern is an absentee owner, there might well be a return to slow response times experienced under the prior management contract. Though Mr. Smith recognized that the September 30 memorandum again made reference to prior performance, experienced as he was in the procurement of facilities, he also recognized that "that was not a part of the evaluation criteria" and "basically, just disregarded that." Thereafter, the award was made to Alderwood. Petitioner contends that whether consciously or unconsciously, past performance of Northern's predecessor in ownership influenced the evaluation and bid review process thereby placing Northern at a competitive disadvantage to Alderwood. There is evidence in the record to indicate this conclusion, may be justified. Mr. Yost, the Facilities Services Manager, admits that he was dissatisfied with the performance of the prior management of the Bay Plaza facility and it was because of this dissatisfaction that the decision was made to recommend withdrawal of the prior award and a new bid invitation. Though he claims he deliberately kept himself out of the re-bid process, the evidence indicates that he oversaw it from the beginning and was present and/or involved in almost every part of it. The invitation to bid utilized his name; he attended the pre-bid conference and injected himself into the process by answering questions of bidders; he personally reviewed each bid upon receipt with Mr. Akridge; and, though he turned the committee selection over to Mr. Akridge, specifically requested that a nominee of his own choosing, Ms. Chipman, be appointed. Ms. Chipman, to whom Mr. Yost had previously spoken regarding his dissatisfaction with the prior Bay Plaza operation, was appointed as the seventh member of a committee originally scheduled to have only six members and served as the chairperson thereof. It is also significant to note that while the committee was in session evaluating the bids, Mr. Yost came into the committee room and met with the members while the deliberation process was going on. This creates a definite appearance of impropriety. After the protest was filed by Northern's agent, on November 8, 1988, Mr. Akridge, on behalf of the Department, met with members of the evaluation committee and representatives of Alderwood. During this meeting, the Department representatives explained to Alderwood how they wanted the layout of the facility to be accomplished and directed the architect who was present to prepare preliminary design plans. This appears to have been in contravention of provisions of a Department rule, (10-13.011(2)(a), F.A.C) which calls for the contract award process to be stopped until the protest is resolved. The evaluation criteria, found on page 16 of 17 of the Bid Submittal Form at subparagraph 1A, states that rental rates for the basic term of the lease, evaluated testing a present value methodology at a discount rate of 8.31 percent, would constitute 25 percent of the total evaluation criteria. This requirement was not appropriately applied in this case. The points included on each committee member's evaluation form for this category do not correlate to the present value rates furnished by the Department. Whereas Alderwood's bid was 21 percent higher than Northern's when reduced to present value, Alderwood received 86 percent of the rental rate points given Northern instead of 79 percent of Northern's points as it should have received. As a result, Northern did not receive the appropriate weight for its rental rates points as compared to it's competitor, Alderwood. In addition to the above, there are several examples indicating that points given by the committee were awarded based on inaccurate assumptions, unreliable information, or speculation. These include a failure to recognize that the windows at Bay Plaza are tinted; an inaccurate belief by one committee member that Alderwood's buildings are closer together than Northern's; a failure to properly apportion points by a committee member in the area of public transportation on the mistaken belief that Northern's facility would not have bus service; a mistaken belief that hallways at the Northern facility could not be widened when, in fact, Northern had agreed to renovate the entire facility including the hallways to whatever design the Department requested, (in this regard, Mr. Akridge properly advised the committee it should assume for the purpose of evaluation, that Northern would widen the Hallways if requested) ; the possible improper award of points for moving costs when no information on actual costs was available; a failure by the committee to recognize that major construction planned for in front of the Alderwood facility would hinder what the committee considered that building's better access; a failure to recognize that bid specifications required a security system be installed in any facility leased which would minimize if not eliminate the theft risk; and a lack of information regarding crime rates, police patrols, night lighting, and the nearness of police facilities to the buildings in question.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the intent to award lease no. 590:1853 to, Alderwood B. Partners, Limited, be withdrawn; that a new evaluation committee be appointed to review the bids submitted by the responsive bidders; that this committee be properly briefed as to the requirements of their task and the appropriate standards to be applied thereto; and that the Department thereafter issue an award to the lowest and best bidder as determined by this evaluation committee. RECOMMENDED this is 15th day of March, 1989 at Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalpachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of March, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-5325BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. BY PETITIONER; Accepted and incorporated herein. Accepted and incorporated herein. First sentence accepted and incorporated herein. Balance accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted but more in the form of argument than as Finding of Fact. The paragraph is redundant to other evidence already considered. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and as to substance, incorporated herein. BY THE RESPONDENT; & 2. Accepted and incorporated herein. Accepted. - 6. Accepted and incorporated herein. Accepted and incorporated herein. & 9. Accepted and incorporated herein. - 12. Accepted and incorporated herein with comment. Redundant to 12. Accepted and incorporated herein. Accepted and incorporated herein. & 17. Accepted and incorporated herein though 17 is redundant to 16. Accepted and incorporated herein as to the fact that bus service is planned for the Bay Plaza facility in 1989. Accepted with the exception of that portion dealing with Mr. Yost's having nothing to do with the evaluation of the bid which is rejected. Accepted but irrelevant. Accepted and incorporated herein. Accepted and incorporated herein. Accepted with the exception of the disclaimer of Mr. Yost's participation in the selection of committee members. Accepted and incorporated herein. Accepted. Accepted with the exception of the last sentence which is not a Finding of Fact but a recitation of testimony. First sentence rejected as a recitation of testimony. The second sentence is accepted. Accepted and incorporated herein. Accepted and incorporated herein. Rejected as a recitation of evidence contained in Mr. Smith's deposition. Not a Finding of Fact. Accepted and incorporated herein. COPIES FURNISHED: Mark A. Brown, Esquire Carlton, Fields, Ward, Emmanuel, Smith, Cutler & Kent, P.A. Post Office Box 3239 Tampa, Florida 33601 Richard Candelora, Esquire Trenam, Simmons, Kemker, Scharf, Barkin, Frye & O'Neill, P.A. Post Office Box 1102 Tampa, Florida 33601 Jack D. Farley, Esquire DHRS District Six Legal Office 400 West Buffalo Avenue, Room, 500 Tampa, Florida 33614 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 John Miller, Esquire DHRS General Counsel 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 Sam Power, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700

Florida Laws (2) 120.57255.25
# 1
MID-STATE PAVING CO., INC. vs DEPARTMENT OF TRANSPORTATION, 08-004272BID (2008)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Aug. 28, 2008 Number: 08-004272BID Latest Update: Jan. 29, 2009

The Issue Whether Respondent acted contrary to the agency's governing statutes, rules or policies, or the bid specifications in its proposed decision to award Contract No. T1285 to Intervenor Kamminga & Roodvoets, Inc. ("K & R").

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of the proceeding, the following findings of fact are made: On May 14, 2008, the Department released its bid solicitation for Contract T1285. The proposed contract was for the construction of a one-way pair through Lake Alfred, including new construction, reconstruction, milling and resurfacing, widening, drainage improvements, lighting, signalization, signing and pavement marking and landscaping on State Road 600 (U.S. 17/92). Polk County, the location of the project, lies in the Department's District 1. Qualified contractors, including Mid-State and K & R, received an electronic disk containing the solicitation, bid blank, plans and specifications for Contract T1285. The letting date for this project was June 18, 2008. Bids were to be submitted on or before that date via Bid Express, the electronic bidding system used by the Department. No party submitted a protest of the terms, conditions, and specifications contained in the solicitation pursuant to Subsection 120.57(3)(b), Florida Statutes. The work to be performed on Contract T1285 included the installation of limerock road base to be paid for in accordance with line item 0175, Optional Base Group 09 ("Base Group 09"). The bid documents included a set of "Supplemental Specifications." Section 6 of the Supplemental Specification was titled "Control of Materials." Subsection 6-3.3, titled "Construction Aggregates," provided as follows: "Aggregates used on Department projects must be in accordance with Florida Administrative Code Rule 14-103."2 Under the heading "Developmental Specifications" is a February 15, 2008, revision to the Construction Aggregates subsection that provides: Subarticle 6-3.3 (Page 54) is expanded by the following: 6-3.3.1 Department Directed Source for Aggregates: For this Contract, obtain aggregates for use in limerock base from the following vendor: Vulcan Construction Materials LP. Upon award of the Contract, provide the vendor and the Department a schedule of project aggregate needs. Once a schedule has been provided to both the Department and vendor, the Engineer will issue written authorization, with a copy to the vendor, for the purchase of aggregates from the vendor. This authorization is required before aggregates will be released by the vendor. Pick up the required aggregate such that the project schedule will be maintained. Payment to the vendor by the Contractor will be due upon receipt of the materials pursuant to the Department's Vendor Contract No. BDH50. This rate is the unit price agreed upon by the Department and the vendor and will be made available to bid proposal holders at the time of bid at http://www.dot.state.fl.us/construction/aggregate /aggregate.htm. The Department will make payment to the Contractor for the aggregates on progress estimates as a part of the bid unit price for the appropriate pay items. The rate is subject to change and adjustments for such changes will be made to the bid unit price of the appropriate pay items. Disputes with the vendor concerning aggregate supply will not be cause for Contract time adjustments, time suspensions or monetary adjustments to the Contract amount. The Contractor will be solely responsible for providing the necessary advance notice to the vendor and other coordination to obtain timely aggregate supply for the project. The import of Developmental Specification 6-3.3.1 was that all bidders would be required to obtain the limerock needed for Base Group 09 from a single vendor, Vulcan Construction Materials LP ("Vulcan"). The winning bidder would agree to pay Vulcan in accordance with a separate contract negotiated between Vulcan and the Department. The hyperlink provided in Developmental Specification 6-3.3.13 led to a document called "Aggregate Guidance" produced by the Department's State Construction Office. The front page of the Aggregate Guidance document contained "Bidder Information" consisting of a spreadsheet setting forth the Vulcan price per ton for limerock base and limestone coarse aggregate, with the price varying depending on the date and port of delivery. Between January and June 2008, the Vulcan price per ton for limerock base from both the Port of Tampa and Port Canaveral was $16.93. The Aggregate Guidance page contained additional hyperlinks with the following titles: "Aggregate Vendor Contract Usage," "Aggregate Vendor Contract," "Aggregate Vendor Projects List," "Aggregate Vendor Authorization Letter," "Aggregate Vendor Contract Frequently Asked Questions," and "Aggregate Price Adjustment Sheet." Alvin Mulford is the vice-president of Mid-State who, along with his estimator, put together his company's bid for Contract T1285. Mr. Mulford testified that his company has been bidding on Department work, and that he has never before seen a provision similar to Developmental Specification 6-3.3.1. Mr. Mulford directed his estimator to obtain clarification from the Department, to be sure that the bidders were required to purchase the limerock base from Vulcan. One reason for Mr. Mulford's concern was the "exorbitant" rate charged by Vulcan in comparison to other vendors. The restriction to a single supplier was so abnormal, and that supplier's rate was so out of line with the market, that Mr. Mulford decided to seek guidance from the Department through the question and response internet bulletin board provided by the Department for its projects. The question posed by Mid-State was as follows: Does the contractor have to use Vulcan materials for the limerock base at a rate of $16.93 per ton as stated in the Developmental Specifications 6-3.3.1? If so from which location is the material to be picked up? Is it also true that payment to the vendor (Vulcan Materials) will be due immediately upon receipt of the materials? I wanted to clarify this issue as it is unusual for the contractor to be limited to the use of only one vendor. The Department's response was as follows: The unit rate for the Material can be found at the following website: http://www.dot.state.fl.us/construction/ Aggregate/Aggregate.htm Pickup locations for the Material can be found at the following website: http://www.dot.state.fl.us/construction/ Aggregate/Aggregate.htm Payment should be issued by the Contractor to the Vendor (Vulcan Construction Materials LP) upon receipt of the materials as defined in Developmental Specification 6-3.3.1. Because the Department's response did no more than redirect him to the Department's website, Mr. Mulford decided to look at the website in more detail. He investigated the hyperlinks, including the Vulcan contract with the Department. When he clicked on the hyperlink titled "Aggregate Vendor Contract Usage," he found a document that provided as follows, in relevant part: Aggregate Vendor Contract Usage by Districts With the execution of the contract with Vulcan Construction Materials LP, contract number BDH50, Vulcan has committed to provide aggregate in the types and quantities defined in the contract (attached). The process for this contract in Districts 1, 5, and 7, is as follows: Include in the projects identified in the attached spreadsheet the appropriate special provision beginning with the July 2007 lettings. The District Specifications Engineer and District Construction Office will need to coordinate this effort. There are two special provisions for the purpose of notifying construction contract bidders of the Department's intention toward the aggregate. The first special provision is the mandatory version that will direct the bidder to obtain aggregates for the specified work from Vulcan. The second special provision provides the bidder an option to obtain its aggregates from Vulcan. * * * After these projects have been awarded, the contractor is required to notify FDOT and Vulcan a schedule of its aggregate needs for the project. After receiving this schedule, FDOT's Resident Engineer will issue written authorization to the contractor, with copy to Vulcan. This authorization is required before Vulcan will release aggregate to the contractor. Payment to Vulcan will be from the contractor. FDOT will pay cost of aggregate on progress estimates as part of the contractor's bid price for the work. The contractor is required to include in its bid price for the work the cost of the aggregate at the Vulcan rate. The Vulcan rate will be posted on the FDOT State Construction Website showing the rate. When adjustments are made to the Vulcan rate, FDOT will make adjustments in the construction contract unit price. . . . (Emphasis added.) Mr. Mulford testified that he understood the underscored language in the hyperlinked document to be a directive to the bidders and therefore a mandatory requirement of the bid specifications. He did not ask the Department for further clarification because he believed the requirement was clearly stated in the hyperlinked document. David Sadler, the director of the Department's office of construction, testified that the hyperlinked document was developed by his office to offer guidance to the districts as to the concept behind and use of the aggregate vendor contract. The document was not a part of the bid solicitation document. Mid-State's bid price was $7,429,398.44. Mid-State's price for Base Group 09 was $619,645.80, or $19.30 per square yard. This price reflected the Vulcan rate for limerock base of $16.92 plus tax and Mid-State's costs for the work associated with Base Group 09. 19. K & R's bid price was $7,370,505.24, or $58,893.20 lower than the bid price of Mid-State. K & R's price for Base Group 09 was $256,848.00, based on a stated unit price of $8.00 per square yard for limerock base. K & R's price for Base Group 09 was $362,797.80 lower than that of Mid-State, accounting for more than the differential between the overall bids of Mid-State and K & R. Marcus Tidey, Jr., K & R's vice president in charge of its Florida division, testified that K & R was well aware that the Vulcan price for limerock base was $16.93, and that K & R understands its obligation to pay that price to Vulcan should K & R be awarded Contract T1285. Mr. Tidey testified that at the time of bid submission, he cut K & R's bid price to $8.00 per square yard as a competitive strategy to win the contract. Mr. Tidey made a conscious decision that K & R would absorb the difference between $8.00 bid price and the Vulcan price of $16.93. Mr. Tidey testified that K & R needed to win this job in order not to have its crews and equipment sit idle during the economic downturn, and therefore decided to take all of its markup, roughly $250,000, out of the bid. He could have made the $250,000 cut on any item or items in the bid, but decided on Base Group 09 because the limerock base was a big item and therefore easy to cut by a large amount. Mr. Tidey also testified that the contract provides a $400,000 incentive payment for early completion of the job, meaning that K & R will be able to work "faster and smarter" and make up for the price reduction at the end of the job. Mr. Tidey testified that he obtained the Vulcan prices from the Department's website as instructed by Developmental Specification 6-3.3.1. He did not click on the hyperlinks, which appeared to reference the contract between the Department and Vulcan and therefore was of no concern to him. The Department and K & R dispute Mid-State's assertion that the underscored language of the hyperlink set forth in Finding of Fact 15 was a requirement of the bid specifications, based on Mr. Sadler's direct testimony and the underlying illogic and unfairness of requiring bidders to seek out hidden specifications. The Department and K & R concede that if the bid specifications did in fact require the bidders to include in Base Group 09 the full costs associated with obtaining the limerock base from Vulcan, then K & R's bid is nonresponsive. Developmental Specification 6-3.3.1 directed bidders to the Department's webpage for the purpose of obtaining the current Vulcan rate quote. It did not instruct the bidders to investigate the hyperlinks or to assume that the information contained therein was mandatory. Absent an instruction to bidders to review the information contained in the hyperlinks, the Department could not make such information mandatory without placing less curious bidders at a competitive disadvantage. The Department had no intent to play hide-and-seek with the bid specifications in the manner suggested by Mid-State. In addition, K & R points to three line items of the bid specifications in which the Department eliminates competition, instructing the bidders not to bid and inserting a fixed unit price and bid amount for all bidders as to those items. K & R reasonably asserts that the Department was fully capable of treating Base Group 09 in the same fashion, had it intended to require the bidders to pass through to the Department all the costs associated with obtaining the limerock base from Vulcan. However, the Department supplied the bid quantity (31,106 square yards) and left it to the bidders to determine the price per unit they would bid. K & R's bid was responsive. Nothing in the bid specifications prevented K & R from absorbing part of the cost of the Vulcan limerock base and passing the savings on to the Department, or required bidders to pass on to the Department the full costs of complying with the bid specifications regarding Base Group 09. The sole remaining issue is whether K & R's bid, though facially responsive, was materially unbalanced. The Department routinely conducts reviews of bid line items that appear "unbalanced," i.e., for which there appear to be significant differences between the price bid and the Department's cost estimate, in order to determine whether the price difference is due to a quantity error by the bidder. The Department's review confirms that the bid quantity specified on the bid blank is accurate. If a quantity error is found, the bids are recalculated using the bidders' unit prices and the correct quantities to determine whether the bid rankings would change. A bid for which there is a discrepancy between the bid and the Department's estimate is termed "mathematically unbalanced." A mathematically unbalanced bid that affects the ranking of the low bid is "materially unbalanced." A mathematically unbalanced bid is acceptable, but a materially unbalanced bid affords the bidder an unfair competitive advantage and must be rejected. The Department followed its usual procedure in analyzing the K & R bid to determine whether it was unbalanced. Philip Gregory Davis, the Department's state estimates engineer, testified that there were some unbalanced items in the K & R bid, but no quantity errors that would have changed the ranking of the bids. Richard Ryals, the project designer who conducted the unbalanced bid review, testified that the quantities were correct for Base Group 09. As noted above, K & R's low bid for Base Group 09 was an intentional strategy, not the result of a quantity error. K & R's current bonded capacity qualification with the Department is $258 million in contracts at any one time. K & R posted a bid bond, and has more than enough capacity to comfortably perform this contract. There is no economic danger to the Department in accepting K & R's low bid.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED that the Department of Transportation enter a final order dismissing Mid-State's formal written protest and awarding Contract T1265 to K & R. DONE AND ENTERED this 9th day of January, 2009, in Tallahassee, Leon County, Florida. S LAWRENCE P. STEVENSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 9th day of January, 2009.

Florida Laws (3) 120.569120.57893.20 Florida Administrative Code (2) 14-103.00114-103.002
# 2
TOWNSEND SHEFFIELD AND UNDERWOOD VENTURES vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES AND DEPARTMENT OF GENERAL SERVICES, 84-000402 (1984)
Division of Administrative Hearings, Florida Number: 84-000402 Latest Update: Sep. 05, 1984

Findings Of Fact This case concerns what is called a "turnkey lease." The program was developed by the State of Florida in 1971. It encompasses a situation whereby agencies seeking space for their operation may, after a specific need is determined that cannot be filled by existing adequate space, solicit competitive bids from developers for the provision of land and the construction of a building there sufficient to meet the agency's needs, for lease specifically to the agency requesting it. The Bureau of Property Management within DGS was given the initial responsibility to develop the guidelines, promulgate the rules, and seek statutory authority for such a program. The Bureau's current role is to work with agencies requesting this program. The agency certifies the need to the Bureau, in addition to the fact that there is no available existing space present. The Bureau then determines agency needs and gives the agency the authority to solicit the bids for the turnkey project. Once the bids have been solicited and the preproposal conferences have been held, the bids are then received, evaluated, and a recommendation for an award is forwarded by the agency to the Department of General Services. DGS reviews the supporting documents required by the provisions of the Florida Administrative Code and either concurs or does not concur in the recommendation. If DGS concurs, the submitting agency is notified and is permitted to then secure the lease. Once the lease has been entered into, it is then sent back to DGS for review and approval, as to the conditions, and thereafter the plans and specifications for the building are also referred to DGS for review and approval as to the quality and adequacy of the plans and specifications and code compliance. Section 255.249 and Section 255.25, Florida Statutes, sets forth the requirement for soliciting and awarding bids for lease space in an amount in excess of 2500 square feet. This provision requires that an award of this nature be made to the lowest and best bidder, and DGS subscribes to that standard in evaluating and determining whether or not it will concur with an agency's recommendation. In the instant case, DHRS advertised for bids for the construction of office space in Palatka, Florida for its District III facilities. Before seeking to solicit bids, District III staff conducted a search for other possible existing space within a five mile radius of the downtown area and located no adequate facilities. Thereafter, a certification of need was processed for a solicitation of proposals and approval was granted by DGS to follow through with the solicitation. A preproposal conference was advertised and held on October 14, 1983 and after review by those present at the conference, bid opening date was set for November 22, 1983. Thirty-two bid packages were distributed and twelve bidders submitted proposals. The public bid opening was held as scheduled at 2:00 P.M. on November 22, 1983, in Palatka, Florida by Robert E. Litza, Facilities Service Coordinator for DHRS District III. Of the bids submitted by the twelve bidders, the lowest bid was rejected because of the failure of the bidder to comply with the requirements of the bid package. Of the remaining eleven bids, the four lowest were evaluated with the understanding that additional high bids would be evaluated if the four lowest were found to be unacceptable. Among the four bids considered were bids of Chuck Bundschu, Inc.; Kenneth McGunn, the Intervenor (Mr. McGunn submitted five price schedules for his bid and of these only one was considered); Elizabethan Development, Inc.; and TSU. A recommendation by the evaluation committee which met at DHRS District III that Intervenor's bid be selected was forwarded to DGS in Tallahassee through the Director of DHRS's General Services in Tallahassee on December 22, 1983. The terms of the successful bid and the reasons for its being considered lowest and best are discussed below. The successful bid for the lease in question, lease number 590:8030, was, upon completion of the committee's evaluation, also evaluated by Mrs. Goodman in the Bureau of Property Management of DGS. She also considered the McGunn bid as the lowest and best of the eleven non-disqualified bids. In that regard, not only Mr. McGunn's bid but all of the twelve bids received were considered and reviewed not only at the local level but at DHRS and DGS Headquarters as well. In her evaluation of the proposal and the bids, Mrs. Goodman considered the documentation submitted by DHRS. This included a letter of recommendation supported by a synopsis of all proposals, the advertisements for bids, and any information pertinent to the site selection process. The letter from DHRS dated December 22, 1983, which recommended award of the lease to Mr. McGunn, included Mr. Litza's December 21, 1983 analysis and recommendation letter which, itself, was attached to McGunn's primary bid documents. Her analysis did not include a prior award recommendation and analysis from Mr. Litza, dated December 8, 1983. It also did not include the site plan, the floor plan for the proposed building, or a survey of the site, but these areas are considered to be within the discretion of the leasing agency. Their absence is not considered to be particularly significant. In her analysis, Mrs. Goodman found that Petitioner's bid was also responsive. However, comparing it with Mr. McGunn's bid, she and her staff found that the latter was the lowest bid submitted. The determing factor in her decision was cost. In determining that McGunn's bid was the lowest as to cost of all bids, Mrs. Goodman compared the average rate per square foot per year for each. This did not take into consideration proration of costs per year, but strictly the average over the fifteen years of the term of the lease (10 year basic plus 5 year option) . According to Mrs. Goodman, this same method of calculating cost has been used in every lease involving a turnkey situation and in fact in every lease since 1958 - as long as she has been with DGS. This particular method, admittedly, is not set forth in any rule promulgated by DGS. However, the agencies are instructed by DGS to advertise and bidders to bid on an average square foot basis, the basis utilized by Mrs. Goodman and her staff in analyzing the bids submitted. In that regard, the request for proposals does not, itself, indicate how the calculation of lowest cost would be made by DHRS and DGS but it does tell prospective bidders what information to submit. This procedure has been followed exclusively in situations like this for many years and many of the bidders have bid before using this same system. While Mrs. Goodman is not certain whether TSU has ever bid before, using this system, she does not consider it to be unfair because all bidders are considered on the same footing in an evaluation. They are notified of what information to submit and if they do so, their information will be considered along with all other bidders. Further, anyone who inquires as to the basis for evaluation will be given a straight and complete answer as to the method to be used. In the instant case, DHRS followed procedure for solicitation and evaluation utilized in the past and DGS followed its own policy in evaluating the submissions. In short, the primary consideration for DGS is the price factor and all other factors are considered to be within the expertise of the requesting agency. In Mrs. Goodman's opinion, based on the fact that she worked with the Florida Legislature on the development of the controlling statute, and helped develop the existing rule within DGS, that was the intent of the Legislature. Consequently since the statute requires award to the lowest and best bidder, it can be said that in this case the term "lowest" falls within the purview of both DHRS and DGS but "best" is solely within the purview of DHRS. Therefore, utilizing the lowest and best criteria and accepting the fact that the lowest bid may not be the best bid, the determination of "non-best" should be based on the reasonable "end objective" of the agency and need not be based on a criterion which is set forth in the bid proposal. In other words, it is not necessary for the agency to set forth the manner of evaluation it will use or the factors it will consider, according to Mrs. Goodman. With regard to the bid and evaluation committee process, Mr. Litza, the facilities manager for DHRS in Gainesville, was involved in putting together the bid package along with Mr. George Smith from Tallahassee, Litza's predecessor in the job in Gainesville. He worked with Mr. Smith in order to take advantage of Smith's experience in evaluating bids for leases. So far as he knew, the bid package contained minimum standards for all parts of the bid, and the package was, in fact, approved by officials in Tallahassee before being released. While no particular factors were identified to prospective bidders as being significant, Mr. Litza did conduct a bid conference for them prior to the date the bid was due and was available to answer any questions that prospective bidders might have. He did not receive any questions regarding the significance of any particular factor from any bidder. The bids were advertised and when received, were opened and read properly in accordance with the terms of the solicitation. When the bids were received and opened, it was seen that Mr. McGunn had submitted five different bids for the same project. Litza had not been confronted with this situation before and asked Mr. Smith what to do about it. Mr. Smith's reply was to put all five McGunn bids in with the rest and extract the lowest five of all bids. When this was done, Mr. McGunn was shown to have submitted two of the lowest five bids. In determining which were the lowest five bids, Mr. Litza utilized the average cost per square foot formula utilizing therein the entire 15,772 square feet authorized for the project. Once the five lowest bids were determined, Mr. Litza selected an evaluation committee made up of local Palatka DHRS supervisors except for the fiscal member, Mr. Foust, Mrs. Shinholster, Litza's secretary and Litza himself. He gave each of the members a score sheet with point values for each area. Each member filled out the form independently. Though he gave very little briefing to the evaluation committee, he admits that he did, in advance, tell each member that Mr. McGunn was the lowest bidder and should be awarded the highest points for criteria number 1, which related to cost. There were several irregularities in Mr. Litza's processing of the evaluation committee's results. For example, on the evaluation of the file conducted by member Sheryl Dollar, regarding criteria number 2, which relates to the conformity of space offered to the specific requirements contained in the invitation to bid (with a weight of 25 points), Mr. Litza admitted he lowered Mrs. Dollar's point award in that area from 35 to 25 without first checking with her to insure that his action would meet with her approval. While this is irregular, it is of little or no consequence since - the maximum number of points that could be given for that particular item was 25 and Mr. Litza's actions did not reduce that member's award to less than the maximum allowable. He contends that his action was based on what he considered to be a mistake on her part. In another apparent irregularity, Mr. Litza prepared a recommendation letter based on his and the other committee members' evaluation of the files to DHRS Headquarters in Tallahassee on December 8, 1983. In that letter, be indicated that McGunn would provide gas heat for the proposed building for free. Though McGunn had not specifically stated this, he implied it from the energy features paragraph in the Intervenor's bid. On the other hand, the bid by TSU contained an express comment offering to pay the utility charges. This specific provision was overlooked and omitted from the evaluation and report to Tallahassee by Litza, who contends that this omission was merely an oversight. There are other discrepancies as well. In his testimony, Mr. Litza indicated Mr. McGunn proposed to build one building but his letter of December 8th and that of December 21, 1984, both reflect two buildings. Here again, Mr. Litza explains this as the result of his being confused. Nonetheless, this erroneous information was referred to Mrs. Goodman at DGS. This is significant in that at the evaluation committee meeting, when the forms were given out, several of the members expressed a preference for a two-building complex. After the award, Mr. Litza secured agreement from McGunn to build two buildings. Mr. Litza admits that much of this was done in an attempt to insure that McGunn, as the low bidder, got the award. Mr. Litza equated the lowest bid with the best and had Petitioner been the low bidder, he contends he would have done the same thing. In most areas, he would not, however, have given Petitioner's four-building concept a high score because of the increased heat and air requirements of four buildings. Mr. Litza also downgraded Petitioner on that bid criteria which relates to the proximity of offered space to the clients to be served because Petitioner's site, he contends, was too close to the clients to be served. In this case, a housing project for low income families which make up much of the clientele to be served by DHRS, was located across the street from the proposed site offered by the Petitioner. Mr. Litza contends that he was thinking of the potential damage to the building because of increased activity by virtue of the facility being so close. There were other questionable areas in Mr. Litza's testimony. For example, he testified that though Petitioner provided 15 more parking spaces than Intervenor, this would result in mud being tracked in from the adjacent dirt road 200 feet away in greater quantities than in Intervenor's proposal. He also considered positively that the Intervenor's proposed site was closer to a restaurant than that of the Petitioner. Though it was recommended by DHRS Headquarters in Tallahassee that only two of the committee members be from the Palatka office, Mr. Litza disregarded that advice because, he contends, there was a morale factor in that office and the people assigned there wanted to have a part in this decision. Because of this, he allowed Ms. Stouffenberg to put five extra members of her staff on the committee. Nonetheless, the evaluation committee serves only in an advisory capacity. Its recommendation is no more than an advisory opinion. The ultimate decision as to which of the bidders should be awarded the contract is made at DHRS Headquarters in Tallahassee. Ms. Shinholster, a Clerk IV in the DHRS Gainesville office, who works as a secretary to Mr. Litza and several others, was advised she would be on the committee for the evaluation at the same time she was given the bid file. She did not get an opportunity to meet with other committee members to talk about the standards to be used, nor was she given any standards by which to evaluate the files. All she was told by Mr. Litza was that McGunn was the lowest bidder. She cannot explain how she accorded points on her evaluation sheets except that she gave the low bidder the highest number of points. Mr. George Smith, a Senior Analyst with DHRS in Tallahassee, relied on Mr. Litza's input when he made his recommendation to his superiors that the award should be made to McGunn. He also formulated his own opinion, based on his own analysis of the bids. He resolved any dispute regarding cost in favor of Mr. McGunn on the basis of the average rental, and regarding space, in favor of McGunn on the basis of the number of buildings. Dr. Perry, an economist with the University of North Florida, testified to the Federal Government's policy regarding the desirability of using the present value of money methodology and the determination of an acceptable discount rate or index in calculating the actual cost of the bids. Both experts, Dr. Perry and Dr. Scott, who testified for DGS, agree that the present value methodology is valid and presents a more accurate analysis of cost than the average rental cost methodology which does not utilize this theory. The major difference between the two was primarily in the percentage to be utilized in applying the discount rate. Whereas Dr. Perry adopted the Federal policy and suggested a 10 percent discount rate, Dr. Scott testified that a more viable percentage rate in November, 1983, at the time the award was to be made, would have been 3.3 percent. If the 10 percent rate were used, then the Petitioner's bid would be the lowest of all submitted. On the other hand, if the 3.3 percent rate were used, Intervenor's bid would be the lowest. If a different discount rate, that of 5.7 percent were to he used, the bid of Elizabethan Development Corporation would be low. It is at about the 6 percent point and above that Petitioner's bid becomes the lowest. Nonetheless, the State has not adopted the present value of money theory and the policy followed by the State is not to consider that methodology in analyzing costs. State policy is to use only the average rental methodology. There are no written instructions (rules) on evaluating bids for leases of this nature. Oral instructions given by DGS to each agency are that the average rate per square foot is to be computed using, if the square footage is constant, for each year of the lease, the basic square footage requested, multiplied by the rental rate proposed for each year of the basic lease, divided by the number of years. If the square footage is not constant in every year of the lease, evaluators are directed to apply the rate per square foot proposed in each year to the square footage to be utilized in that year, total up the annual rentals, total up the square footage involved, and divide to arrive at the average rate per square foot per year. Utilizing one or the other of those two methods in evaluating both the McGunn and the TSU bids, it becomes clear that the McGunn bid results in an average of $8.86 cost per square foot per year and the TSU bid an average of $9.58 per square foot per year. Recalculation of DHRS' evaluation by DGS showed the DHRS' figures as stated above were correctly arrived at. This procedure is followed on all turnkey and non-turnkey leases in the State of Florida. The reason the State uses this process instead of the present value of money process is because it is easy. DGS statistics indicate that most landlords in the approximately $32,000,000 worth of leases presently existing with the State are "Mom and Pop" landlords. These people are not normally trained lease evaluators. By using the straight average rental rate method, there are no arbitrary variables. It has always worked because people can understand it and all agencies which lease property in the State of Florida follow this procedure. Also, this procedure does not require computer-based calculations, and it does not require economists to work with it. Both latter reasons are amplifications of the first. In Mrs. Goodman's estimation, if the present value of money system were to be adopted, her division would have to hire at least two $30,000 per year economists and buy an in-house computer to operate the system. This additional cost, she believes, would far outweigh the paper savings to be realized by utilizing the present value of money system. As of the hearing date, considering all the factors, in Mrs. Goodman's opinion, DGS would nonetheless still recommend Mr. McGunn's bid as the lowest and best bid.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore RECOMMENDED that DHRS lease Number 590:8030 be awarded to Kenneth R. McGunn. RECOMMENDED this 5th day of September, 1984, in Tallahassee, Leon County, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of September, 1984. COPIES FURNISHED: Donald E. Holmes, Esquire William E. Townsend, Jr., Esquire Post Office Drawer D Palatka, Florida 32078-0019 James A. Sawyer, Jr., Esquire District III Legal Counsel Department of Health and Rehabilitative Services 1000 Northeast 16th Avenue Gainesville, Florida 32609 Stephen J. Kubik, Esquire Department of General Services Room 452, Larson Building Tallahassee, Florida 32301 H. Allen Poll, Esquire 112 South Main Street Gainesville, Florida 32601 Linda C. McGurn, Esquire 1717 Northeast 9th Avenue Gainesville, Florida 32301 David H. Pingree, Secretary Department of Health and Rehabilitative Services 1321 Winewood Boulevard Tallahassee, Florida 32301 Ronald W. Thomas, Executive Director Department of General Services 115 Larson Building Tallahassee, Florida 32301

Florida Laws (3) 216.311255.249255.25
# 3
ROBERT A. WEINBERG, TRUSTEE FOR ROBERT ALLAN WEINBERG REVOCABLE TRUST vs DEPARTMENT OF INSURANCE, 98-003593BID (1998)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 10, 1998 Number: 98-003593BID Latest Update: Nov. 24, 1998

The Issue The issue in this proceeding is whether the Respondent, the Department of Insurance, acted illegally, arbitrarily, fraudulently, or dishonestly in rejecting all bids for lease #460:0119 and not awarding subject lease to Petitioner.

Findings Of Fact The Department of Insurance established a requirement to lease 5371 square feet of office space in Daytona Beach, Florida, and a "Request for Space Need" was approved by the Department of Management Services on February 11, 1998. The Department of Insurance subsequently issued a Request for Proposal (RFP) for lease #460:0119 (Respondent's Exhibit 1). A non-mandatory pre-bid conference was held on June 1, 1998, in Daytona Beach and two prospective bidders, Petitioner and Nova Village Market partnership attended. The RFP provided that proposals which did not meet all mandatory requirements of the RFP would be rejected as non- responsive. The RFP provided for evaluation criteria are awards factors. The awards factors totaled 100 points with no minimum point total required. Ten of the points were allotted for moving costs defined as the costs of relocating communications, networks, furniture and other equipment. This factor gave the current landlord an automatic 10-point advantage since there would be no relocation costs. Moving costs provisions tend to discourage the presentation of bids because the bidders have to overcome an automatic 10-point advantage provided the current landlord. The RFP also provided that all proposals could be rejected, however, such "rejection shall not be arbitrary, but be based on strong justification." None of the conditions of the RFP were questioned or challenged by interested parties. Two responses were received by the Department of Insurance in response to the RFP and these were opened in Respondent's Tallahassee office on July 8, 1998, by Mr. Kip Wells of the Department. One was received from the current landlord, Nova Village Partnership, hereafter Nova, and the other from the Petitioner. The Nova proposal was deemed non-responsive. Neither Nova nor Petitioner contested the determination that Nova's proposal was non-responsive. Only one responsive proposal, the Petitioner's proposal, remained. On July 9, 1998, the Department representative, Mr. Kip Wells, called Petitioner to schedule an appointment for 9:00 a.m., on July 10, 1998, to visit and evaluate the proposed facility. No persons from the Department appeared at the scheduled appointment. At 10:45 a.m., on July 10, 1998, Kip Wells called Petitioner to say that since Petitioner's proposal was the only responsive proposal received, and that "all bids" were being rejected. Mr. Wells testified at hearing. His reason for rejecting the remaining bid was: When I saw that it was obvious the current landlord was not going to be very cooperative, I decided that one choice was not enough. If we were going to have to make a move, we needed more than one thing to choose from. So, I immediately - - since I had already set up with local people in Daytona to tell them that I was coming down to evaluate the bids, I sent them an E-mail and told them that I would not be meeting the following day to evaluate the bids. Mr. Wells decided to reissue the RFP without any moving costs criteria, and redistribute those 10 points among the other award factors. Petitioner filed a Notice of Intent to Protest and then a Formal Protest, both in a timely fashion. There is no state policy prohibiting the award of a lease to a sole bidder on a RFP. The "Leasing Policy" of the Department of Insurance states that "The Lease Administrator, with assistance from the Division employees, will establish bid or quote specifications. These specifications will include special needs for the Division(s) as well as the evaluation criteria upon which to evaluate the proposals." Neither the Department's Lease Policy (Petitioner Exhibit 3) nor the State's Real Property Leasing Manual (Petitioner's Exhibit 4) give the Lease Administrator the authority to reject or evaluate bid responses. Neither does he have a vote in the bid evaluation process. His responsibility is to coordinate the process. Randall Baker, Manager of Private Sector Leasing of the Bureau of Property Management of the Department of Management Services (hereinafter DMS), testified. The DMS prepares a manual as a guideline for user agencies to assist in the leasing of property. The DMS manual is not binding on agencies and DMS has no review oversight; however, their comments on agencies' leases are reviewed by the state auditing authorities and failure to follow the guidelines can result in audit criticism. Baker confirmed that the agency's written procedures as outlined in the RFP were consistent with the DMS guidelines. The DMS manual states as follows regarding the receipt of only one responsive proposal: When only one responsive proposal is received it may be considered and accepted providing the following conditions are documented: Adequate competition was solicited. The rate is within established rental rate guidelines. The proposal meets stated requirements. The proposal was processed as though other proposals were received. The Petitioner's bid was responsive to the RFP and the lease rate bid by the Petitioner was less than the average rate for state leases in the Daytona area and less than the amount budgeted by the Department for this lease. The lease rate by the Petitioner was reasonably priced and competitive. Although the agency failed to complete the process as envisioned, see paragraph 20 below, this was in no way the fault of Petitioner. The Department's leasing policy requires that the lowest and best response to an RFP be determined through cost analysis and evaluation by an evaluation committee. Mr. Wells did not forward Petitioner's bid to or discuss with the evaluation committee Petitioner's bid, but unilaterally rejected it. It was clear from Mr. Wells' testimony that this was his individual decision and was based upon his personal belief that it was the best thing to do.1 At hearing, the stated justification for rejecting "all bids" was that it gave the Department the opportunity to delete the requirement of moving costs from the awards factors; however, the evidence does not indicate that the moving cost provision result in non-competitive bids. The sole responsive bidder was within the local lease price range and within budget. Neither the Respondent nor DMS has established a policy prohibiting the acceptance of a sole responsive bid if there is competition solicited. The Department of Insurance has accepted a sole bid on at least one project in the past. There was no evidence that the RFP was not an open and fair competition. The evidence shows that it was properly advertised, that all conditions were known, and that all interested parties had an equal opportunity to participate. In sum, there was adequate competition in submitting the bids. Mr. Baker testified regarding the policy of DMS. The DMS policy is that if there is one responsive bidder, there has been competitive bidding. The RFP provides that the Respondent may reject all bids if it has strong justification. See paragraph 5 above. Mr. Baker also provided examples of "strong justification for rejecting proposals." His examples include facilities which are proposed outside the required geographic area, prices considerably in excess of state guidelines and agency budgets, specification changes due to modification of the agency's program requirements, and "intervening external forces." No evidence establishing a strong justification for rejecting the Petitioner's bid was presented. Without completing the process and evaluating the Petitioner's bid, the agency never considered whether the bid was in the state's best interest. However, this was not the fault of the Respondent, and the agency's failure to follow its procedures should not inure to its benefits. Further, Because there was no minimum score required on the evaluation criteria of the RFP, there is no need to evaluate Petitioner's proposal because it is the only responsive proposal. For all the reasons stated above, the rejection of Petitioner's bid was contrary to the terms of the RFP, contrary to state policy, and arbitrary.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is, RECOMMENDED: That a Final Order be entered which finds that: Respondent's actions in rejecting Petitioner's responsive bid were arbitrary; The Respondent did not follow the requirements set forth in the Department of Insurance Leasing Policy, nor the Department of Management Services Real Property Leasing Manual, or the Request for Proposal itself; That no adverse interest to the State or the Department would have occurred had Petitioner's responsive bid been accepted; and therefore, Petitioner's claim shall be upheld as the lowest cost and best proposal for RFP #460:0119, and that the Department of Insurance shall award Petitioner Lease #460:0119. DONE AND ENTERED this 30th day of October, 1998, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 30th day of October, 1998.

Florida Laws (3) 120.57255.249255.25
# 4
NELSON P. DAVIS vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003868BID (1988)
Division of Administrative Hearings, Florida Number: 88-003868BID Latest Update: Sep. 28, 1988

Findings Of Fact The Department of Health and Rehabilitative Services currently leases approximately 22,000 square feet of space from Nelson P. Davis. The space is contained in two separate buildings, both located at 417 Racetrack Road, Ft. Walton Beach, Florida. The Department and Davis were involved in a legal dispute involving the currently leased premises, which concluded in 1986 with the entry of judgment in Davis' favor. While some antagonism remains between the parties related to the legal action instituted by Davis, Davis has been an acceptable landlord in all other respects. The current lease expires February 1, 1989. Davis has been aware, since late February or early March of 1988, that the Department would need space in excess of the currently occupied 22,000 square feet, but was not aware of the actual additional space requirements until the issuance of the invitation to bid. In general, the Department's space requirements have increased annually. In response to the anticipated need for additional space, Davis initiated plans for design of a third Racetrack Road building that could meet the additional need, but did not construct the facility. In response to the space requirements of previous years, Davis has constructed additional space. The Department has occupied the additional space in such proportions as to avoid the competitive bidding process, however, the current need for additional space exceeds the maximum which can be leased without competitive bidding. The Department on May 11, 1988, issued an invitation to Bid for approximately 26,165 square feet of space in Ft. Walton Beach, Florida. (HO #1) In response to the invitation, Davis submitted a bid proposal. The Davis proposal, the sole proposal received by the Department, was disqualified by the Department as non-responsive. On June 23, 1988, the sole bid was opened by Joseph Pastucha, HRS District One Facilities Manager, who initially reviewed the Davis bid. Mr. Pastucha identified items of concern related to the responsiveness of the bid and then provided the information to his supervisor, who in turn provided the information to Mr. James Peters. The Department did not contact Davis for further information or to provide the opportunity to correct any defects. James Peters, HRS's District One Manager for Administrative Services has expressed on at least one occasion a desire to avoid entering into business arrangements with Nelson P. Davis. The bases for Peters' opinion is the earlier litigation between the parties. Peters was on the committee which was to have evaluated bids submitted in response to the invitation. However, Peters has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that Peters based his opinion regarding the Davis bid submission solely on the earlier litigation or that any other person involved in the agency's action permitted personal opinions to affect the decisional process. Davis' bid proposal included the two buildings constituting approximately 22,000 square feet located at 417 Racetrack Road which the Department currently occupies, plus a third building of approximately 4,000 square feet. The proposed square footage and lease cost were acceptable. The third building was to be either a planned, unconstructed building located at the 417 Racetrack Road location or an existing building located "7/l0ths of a mile southeast of the present HRS offices," (the off-site building). However, a memorandum attached to Davis' submission stated that he did not intend to use the off-site building for HRS purposes, (HO #2). Further, Davis had previously indicated in conversation with the HRS manager of the 417 Racetrack Road offices that he planned to utilize the off-site space otherwise. On page one of the bid submittal form Davis indicated the address of the proposed location as 417 Racetrack Road. By letter dated July 5, 1988, the Department notified Davis that his bid offering was deemed non-responsive and that the Department expected to readvertise for space in Ft. Walton Beach. The letter made no mention of any opportunity to protest the determination. The statement, "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes," which is required to be included in the notice of agency decision by Section 120.53(5)(a), Florida Statutes, was omitted by the Department. (HO #3) On or about July 7, 1988, Davis contacted the Department of General Services to express his dismay regarding the disqualification of his submittal. A meeting, held on or about July 19, 1988, between Davis and Department representatives, did not alter the Department's position. On or about July 25, 1988, the written notice of protest and request for hearing was filed. The Department forwarded the request to the Division of Administrative Hearings. The letter dated July 5, 1988, advising Davis that his bid was deemed non-responsive enumerated five reasons for the Department's decision. The reasons stated were: No photograph of the proposed facility was submitted as requested; No floor plan of the facility was submitted as requested; A substituted site was submitted Proposed space was not an existing building and was not measurable; Three buildings in bid proposal constitute three locations and are unacceptable. The letter was signed by Chuck Bates, DHRS Deputy District Administrator, District One. The letter was drafted by James Peters. (HO #3) Mr. Bates relied upon Peters and Pastucha to provide information sufficient to justify the disqualification of the bid, and was satisfied that the action was justified prior to signing the letter. Examination of the bid submittal package reveals that Davis failed to acknowledge by initial the requirements of page seven, but that he did, on that page, appropriately respond to questions related to proposed parking spaces being bid. The Department did not base the disqualification of the bid on the failure to acknowledge the page and did not include the failure to initial the page in the stated reasons for deeming the bid non-responsive. Paragraph 9(a) of the bid submittal form requires the submission of a clear photograph of the exterior front of the building. (HO #2) Davis submitted no photographs. Paragraph 9(b) of the bid submittal form requires the submission of a scaled floor plan showing present configurations with measurements. (HO #2) Davis submitted floor plans for the proposed-to-be-constructed building and for the off-site building, but failed to submit floor plans for the two buildings which the Department currently occupies. The bid also failed to include calculations of net rentable square footage related to the omitted floor plans. The letter to Davis stated that an additional reason for disqualification of his bid from further consideration was the submission of a substituted site, (HO #3). The "substituted site" refers to Davis' inclusion of the off-site building not identified in the bid submission other than by the statement that the building was located seven-tenths of a mile southeast of the present HRS office location. No map, street address, legal description, or other identifying information was submitted. The proposal submitted by Davis included plans to construct a third building at 417 Racetrack Road, which was rejected as not measurable. The invitation to bid states that to be considered, the space must be existing, dry and physically measurable, at the time of bid submitted. (HO #1) The proposed third building clearly fails to meet this requirement. While the Department may permit the correction of minor deficiencies, the deficiencies were adjudged by the Department to be more than minor. The proposal's inclusion of nonexisting space (Racetrack Road building #3) or in the alternative a building, the location of which can not be determined from the bid information and which the bidder apparently intends not to provide, is non- responsive to the specifications of the invitation. As to the fifth enumerated reason for disqualification of the bid (three buildings/three locations) the Department and Petitioner presented extensive testimony related to paragraph 3(b) of page 15 of the bid submittal form. Page 15 of the bid submittal form is titled "Evaluation Criteria" and contains a list of weighted factors which were to be used in the evaluation of bids. (HO #2) Paragraph 3(b) states, as one factor for consideration in evaluation, whether the bid provides for the required aggregate square footage in a single building, and continues, "[p]roposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within yards of each other." (HO #2) The space left for the specification of maximum yardage was erroneously left uncompleted by the Department and the Department did not learn of the error until the bid was submitted. The Department's disqualification of the bid on this basis relies on the Department's assertion that the three buildings included in the Davis proposal constitute three locations and that a responsive bid may contain not more than two locations. The Department's position is that "location" and "building" are synonymous and that paragraph 3(b) of the evaluation criteria prohibits consideration of a bid submission including more than two buildings. The Department's position is rejected as arbitrary. The bid package does not state that proposals including more than two buildings will be disqualified. The sole reference to the number of buildings in a responsive bid submission is as stated and contained on the page of "Evaluation Criteria", wherein it is identified with a weighting factor of five percent of total possible points.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-3868BID. DONE and ENTERED this 28th day of September, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of September, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-3868BID The following constitute rulings on the proposed findings of fact submitted by the parties. Petitioner: Accepted in part. The use of the word "required in the fourth sentence is rejected. The referenced section relates to evaluation factors, not specific requirements. Accepted. Accepted in part. The third building was proposed as either the off-site building or the planned, non-existent space. Accepted. Accepted. Accepted. Rejected as restatement of testimony. Other testimony indicated that Petitioner planned to use the off-site location for non-HRS purposes. Rejected, immaterial. Accepted. Accepted. Accepted as modified. Accepted in part. The use of the word "technical" is rejected. Accepted. Accepted as modified. Accepted as modified. Accepted. Accepted. Accepted. Accepted as modified. Accepted as modified. Accepted as modified. The change between the two invitations to bid was to clarify the obvious confusion related to the use of terms "location" and "building" and was made not to the bid specifications but to evaluation criteria. Rejected as restatement of testimony. Rejected, conclusion of law. Accepted so far as relevant. While the Davis bid was disqualified as non-responsive, the right to reject any and all bids encompasses the disqualification of a bid as non-responsive to the specific requirements of an invitation to bid. Respondent: Rejected, conclusion of law. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Floor plan of the off-site building was submitted showing that the building is essentially a hollow, box-like structure. Accepted. Accepted. Accepted. Rejected, irrelevant. While the usual distance may be 100 yards, the actual bid specifications do not state such. Further the sole reference to the distance between "locations" was contained in evaluation criteria. At no time prior to the June 23, 1988 bid opening did the Department attempt to identify the preferred distance between locations. Accepted. Accepted. Accepted. COPIES FURNISHED: Bruce A. McDonald, Esquire Post Office Box 887, Suite 105 151 Mary Esther Cutoff Mary Esther, Florida 32569 Rodney M. Johnson, Esquire Acting District One Legal Counsel Post Office Box 8420 Pensacola, Florida 32505-8420 Joseph J. Pastucha 3300 North Pace Boulevard Room 109 Town & Country Plaza Pensacola, Florida 32505 Jan Kline 417 Racetrack Road Ft. Walton Beach, Florida 32548 James V. Peters Department of General Services 160 Governmental Center Fourth Floor, Room 412 Pensacola, Florida 32501 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Tom Batchelor Staff Director House HRS Committee The Capitol Tallahassee, Florida 32399-1300

Florida Laws (2) 120.53120.57
# 5
EARL S. DYESS, JR. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003791BID (1988)
Division of Administrative Hearings, Florida Number: 88-003791BID Latest Update: Apr. 14, 1989

The Issue Whether the Petitioner was the lowest responsive bidder in Lease No. 590:1975, and therefore entitled to the contract award.

Findings Of Fact In 1988, the Department made the determination that it would not exercise its option on leased space owned by the Petitioner Dyess, in Clewiston, Florida. Bid documents were prepared by the agency for its current office space needs. Bid proposals were solicited through newspaper advertisements and personal contact with owners, developers, and realtors within the Clewiston area. The Department included Dyess in its solicitations. He was sent an Invitation to Bid for Existing Facilities by the Department. This bid package contained all of the bid documents for the bid referred to as Lease Number 590:1975. The Invitation to Bid was issued by the Department for approximately 7,962 square feet of net rentable office space in Clewiston, Florida. The invitation was prepared using HRS Facilities Form R01-87. The form used by the Department for soliciting and accepting competitive proposals for the leased space was required to comply with all conditions and requirements adopted by the Department of General Services, as set forth in Rule 13M-1.015(3)(e), Florida Administrative Code. The Department of General Services is the agency which administers real property leasing for the State of Florida for leased space of 2,000 square feet or more in privately owned buildings. During the bidders' conference held on April 26, 1988, Mr. Michael J. Sedgwick, the agency's representative, was questioned about the agency's interpretation of the term "dry and capable of being physically measured" which is set forth on page two of the Invitation to Bid and page three of the Bid Submittal Form. Page two of the Invitation to Bid is a glossary which defines various terms used within the bid documents. The term "existing building" is defined as follows: To be considered as existing, the entire space being bid must be dry and capable of being physically measured to determine net rental square footage at the time of the bid submittal. Paragraph 10 on page three of the Bid Submittal Form reiterates the definition of an "existing building" as set forth in the Invitation to Bid. The language in the bid documents which defines the term "existing building" is identical to the language in Form BPN 4136, which has been promulgated as a rule by the Department of General Services as the format for specifications for the solicitation of leased spaces by the State of Florida. In response to the request for an interpretation, Mr. Sedgwick contacted Mr. George Smith, who administers the leasing program for the Department in Tallahassee, and obtained the following definition: "Dry and measurable" consists of four things: a slab, four corners, a roof, and a valid building permit if construction is in progress. The definition given by Mr. Smith was verbally communicated to the prospective bidders who attended the conference. This definition was verbally communicated to the Petitioner by Mr. Sedgwick on April 27, 1988. The Petitioner timely submitted a bid in Lease Number 590:1975 on the Department's Bid submittal Form by May 24, 1988. On page three of this form, each bidder was required to acknowledge the bid requirements contained on that page by placing his initials in the bottom right hand corner. The Petitioner Dyess acknowledged the requirement that the proposed space must be an "existing building" at the time of the bid submittal. On May 24, 1988, the date of the bid opening, Petitioner's building did not meet the requirements of an existing building as defined within the bid documents or the Department's verbal clarification of the definition. The building did not have a roof, a slab, or a valid building permit. After the bids were opened, the District VIII Bid Evaluation Committee visited each of the proposed lease locations. When the Petitioner's proposed location was reviewed by the committee two days after the close of bids, the addition was found to consist of the following: two partially completed block walls which connected the two existing buildings. The existing buildings were still intact, but it was apparent that an expansion was taking place, and that the completed project would be one building. A slab had not yet been poured in the addition, and it was without a roof. The plans submitted to the Department with the Petitioner's bid suggested that this expansion was capable of producing the square footage required by the Department. The City of Clewiston was aware of the Petitioner's expansion project, but he was not required by this authority to have a building permit at the time the project was viewed by the committee and evaluated by the Department. The Petitioner's bid was rejected by the Department because, on the date of the bid submittal, the proposed addition was not an "existing building" as defined by the bid documents and the further verbal interpretation by the agency. The bid submitted by the Intervenor Tibbetts did not contain the complete contract for the purchase of the property. However, the right to purchase was evidenced by a document submitted with the bid. Full Disclosure Statements of Ownership are not required under Rule 13N-1.015, Florida Administrative Code, until after a bid is awarded. The property was not properly zoned at the time of the Intervenor Tibbetts' bid submittal.

Florida Laws (3) 120.53120.57255.249
# 6
BLISS PARKING, INC. vs BROWARD COUNTY SCHOOL BOARD, 94-002031BID (1994)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Apr. 15, 1994 Number: 94-002031BID Latest Update: Jul. 26, 1994

Findings Of Fact Findings based on stipulation The School Board of Broward County, Florida, ["Board"] issued bid number 94-307D [Lease of School Board Owned Parking Lot - Term Contract] on the 22nd day of November, 1993. Three bidders responded to the invitation to bid. They were: Bliss Parking, Inc., a Florida Corporation ("Bliss"); Fort Lauderdale Transportation, Inc., d/b/a USA Parking Systems ("USA"); and Carl A. Borge. An initial review of the tabulations of the bids indicated that Bliss and USA had submitted the identical percentage of shared revenue to the Board in their respective bids. After the review of the bids, Board staff posted a recommendation to award the bid to USA. [See the "remarks" portion of Exhibit B.] A bid protest was filed by Bliss because of the "remarks" portion of Exhibit B. After a review of Bliss' bid protest, Board staff amended its recommendation to reject all bids because of the issues raised in Bliss' protest. After Board staff notified all bidders of this amended recommendation, USA filed a notice and formal protest. The Board, at its meeting on March 1, 1994, heard the presentation of USA and Board staff. The Board, after deliberating the matter, deferred the item until the meeting of March 15, 1994, wherein seven Board members would be present. At the March 15, 1994, Board meeting, by a vote of 4 to 3, the Board granted USA's protest and awarded the bid to USA whom the Board had determined was the highest bidder meeting bid specifications. All bidders were notified of the Board's action and on the 16th day of March 1994 Bliss timely filed its notice of protest and its formal written protest. Bliss appeared with counsel before the Board on the 5th day of April 1994. After considering arguments of counsel for Bliss and reviewing the material in Agenda Item H-1 and in consideration of its previous actions, it voted to reject Bliss' protest seeking the rejection of all bids received and re-bidding of the item. Bliss subsequently requested a formal hearing under Chapter 120.57, Florida Statutes. Findings based on evidence adduced at hearing The General Conditions portion of the Invitation To Bid includes the following provision: INTERPRETATIONS: Any questions concerning conditions and specifications must be submitted in writing and received by the Department of Purchasing no later than five (5) working days prior to the original bid opening date. If necessary, an Addendum will be issued. A related provision in the Special Conditions portion of the Invitation To Bid reads as follows: 21. INFORMATION: Any questions by prospective bidders concerning this Invitation to Bid should be addressed to Mrs. Sharon Swan, Purchasing Agent, Purchasing Department, (305) 765-6086 who is authorized only to direct the attention of prospective bidders to various portions of the Bid so they may read and interpret such for themselves. Neither Mrs. Swan nor any employee of the SBBC is authorized to interpret any portion of the Bid or give information as to the requirements of the Bid in addition to that contained in the written Bid Document. Questions should be submitted in accordance with General Condition #7. Interpretations of the Bid or additional information as to its requirements, where necessary, shall be communicated to bidders only by written addendum. The Special Conditions portion of the subject Invitation To Bid includes the following provisions: REFERENCES: A minimum of three (3) references must be provided by completing page 14 of the bid. Failure to provide references with the bid or within five (5) days of request by the Purchasing Department will be reason for disqualification of bid submitted. All references will be called. SBBC reserves the right to reject bid based on information provided by references. Page 14 of the Invitation To Bid has three sections, each of which reads as follows: COMPANY NAME: STREET ADDRESS: CITY: STATE: ZIP: TELEPHONE NUMBER: CONTACT PERSON'S NAME: NUMBER OF PARKING SPACES: LENGTH OF CONTRACT: At page 12 of the Invitation To Bid, the following note appears under the Bid Summary Sheet portion of the document: "NOTE: Calculation of high bidder shall be the bidder offering the highest percent of shared revenue meeting all specifications and conditions of this bid." The Special Conditions portion of the Invitation To Bid also contains a procedure for resolving tie bids, which reads as follows, in pertinent part: TIE BID PROCEDURES: When identical prices are received from two or more vendors and all other factors are equal, priority for award shall be given to vendors in the following sequence: A business that certifies that it has implemented a drug free work place program shall be given preference in accordance with the provisions of Chapter 287.087, Florida Statutes; The Broward County Certified Minority/ Women Business Enterprise vendor; The Palm Beach or Dade County Certified Minority/Women Business Enterprise vendor; The Florida Certified Minority/Women Business Enterprise vendor; The Broward County vendor, other than a Minority/Women Business Enterprise vendor: The Palm Beach or Dade County vendor, other than a Minority/Women Business Enterprise vendor; The Florida vendor, other than a Minority/Women Business Enterprise vendor. If application of the above criteria does not indicate a priority for award, the award will be decided by a coin toss. The coin toss shall be held publicly in the Purchasing Department; the tie low bid vendors invited to be present as witnesses. The Petitioner filled out all three sections on page 14 of the Invitation To Bid and submitted that page with its bid. The three references listed by the Petitioner were companies for whom the Petitioner provided parking services or parking facilities, but none of the three references listed by the Petitioner was a land owner from whom the Petitioner leased land for the operation of a parking facility. Mr. Arthur Smith Hanby is the Director of Purchasing for the School Board of Broward County. In that capacity he is in charge of the bidding process for the School Board. Specifically, he was in charge of the bidding process for the subject project. In the course of evaluating the bids on the subject project, the evaluation committee reached the conclusion that there was a problem with the bid submitted by the Petitioner with respect to the references listed in the Petitioner's bid. In the original bid tabulation and recommendation posted on January 4, 1994, the recommendation was that the contract be awarded to the Intervenor, whose bid amount tied with the Petitioner's bid amount. 4/ The reasons for the recommendation were described as follows in the "remarks" portion of the tabulation and recommendation form: REJECT BID FROM BLISS PARKING, INC. REFERENCES WERE GIVEN ON PAGE 14 OF BID. ALL REFERENCES WERE CALLED. BASED UPON INFORMATION PROVIDED BY THESE REFERENCES AND IN ACCORDANCE WITH SPECIAL CONDITION #10, IT IS RECOMMENDED THAT THE BID FROM BLISS PARKING, INC. BE REJECTED. EVALUATION OF THIS BID CEASED AT THIS TIME. THERE MAY BE ADDITIONAL REASONS WHY THIS BID COULD NOT BE ACCEPTED. The sole reason for the rejection of the Petitioner's bid was that the references listed by the Petitioner were not the types of references the evaluation committee wanted to receive. The evaluation committee wanted references from entities who, like the School Board, were land owners who had leased land to a parking lot operator. The evaluation committee was of the opinion that references from other sources would not adequately protect the interests of the School Board. There is nothing in the Invitation To Bid that addresses the issue of who should be listed as references. Specifically, there is nothing in the Invitation To Bid requiring that references be submitted from land owners who had leased land to a parking lot operator. At the time of the issuance of the subject Invitation To Bid, the Petitioner was operating the subject parking lot for the School Board. There were no material differences in the bids submitted by the Petitioner and the Intervenor other than the differences in the types of references they listed. The Petitioner's references who were contacted did not provide any adverse information about the Petitioner. The evaluation committee spoke to two of the references listed by the Petitioner, but did not speak to the third listed reference. The third reference listed by the Petitioner was a court reporting firm located across the street from the location of the subject parking lot. The evaluation committee did not speak to anyone at the court reporting office because the telephone number listed for that reference was not a working number. The evaluation committee made an unsuccessful attempt to locate the telephone number of the court reporting firm in the telephone book.

Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the School Board issue a final order in this case concluding that the Petitioner's bid is responsive to the Invitation To Bid and that the School Board then take one of the courses of action described in paragraph 26, above. DONE AND ENTERED this 23rd day of June 1994 at Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of June 1994.

Florida Laws (2) 120.57287.087
# 7
JANUS AND HILL CORPORATION vs PALM BEACH COUNTY SCHOOL BOARD, 94-001622BID (1994)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Mar. 25, 1994 Number: 94-001622BID Latest Update: Aug. 29, 1996

Findings Of Fact In February 1994 the School Board, by and through its design consultants, W. R. Frizzell Architects, Inc., and, more particularly, its project architect, Byron Tramonte, issued plans, specifications, and related contract documents associated with additions, remodeling, and reroofing of John F. Kennedy Middle School, Palm Beach County, Florida. At a pre-bid conference conducted at the project job site attended by representatives of the School Board, its consultants, as well as representatives of Petitioner, Respondent, and Intervenor, among others, Petitioner's Greg Hill questioned the sufficiency of the drawings with respect to the earth work requirements associated with Alternate 1. As a result of this inquiry, the owner's design consultant issued Addendum 2 (including an as-built drawing) dated February 23, 1994, which was ". . . made available for grading estimates." The drawing attached to Addendum 2 had two sets of elevation numbers on it. One set of elevation numbers were underlined. The clearest of the underlined numbers were difficult to read. Many of the underlined numbers were impossible to read. The other set of elevation numbers on the subject drawing were boxed. The boxed numbers were all clear and legible. In view of the purpose for which the drawing was attached to Addendum 2, the most logical interpretation of the drawing was that the boxed elevation figures represented the existing elevations. The drawing attached to Addendum 2 also included some circled handwritten information. In large letters the circled information read: "JFK MIDDLE SCHOOL AS BUILT EXIST. ELEV." Immediately below in smaller letters it read: "Note: The 2 softball fields were not constructed. 2/23/94." The circled handwritten information was to some extent ambiguous. But it was an ambiguity that could be resolved by careful site inspection. Careful site inspection would have revealed that the boxed numbers corresponded to existing site conditions and that the underlined numbers, to the extent they were legible, did not. Petitioner's Vice President Greg Hill was primarily responsible for the preparation of the portion of the Petitioner's bid relating to Alternate 1. Greg Hill visited the job site during the prebid conference and also visited the job site on one other occasion after receiving Addendum 2, but before submitting the Petitioner's bid. Greg Hill is an experienced estimator with respect to matters involving the type of work encompassed by Alternate 1. In spite of his experience and in spite of his two pre-bid site visits, Greg Hill misinterpreted the architect's intent and used the underlined elevations on the drawing attached to Addendum 2 as a basis for estimating portions of the work associated with Alternate 1. As a result of this mistake Greg Hill reached erroneous conclusions about the amount of fill that would be required and substantially overestimated the amount of fill. This mistake caused the Petitioner's bid for Alternate 1 to be somewhat higher than it would have been if Greg Hill had based his estimates on the boxed elevation numbers. A similar mistake was made by CSR Heavy Construction-North, Inc., a company that was seeking work as a subcontractor on Alternate 1. On the last day for submitting bids on the subject project, the Intervenor received an unsolicited bid from CSR Heavy Construction-North, Inc., to perform some or all of the work encompassed by Alternate 1. CSR's bid was much higher than the Intervenor's proposed bid for that work, which caused the Intervenor's President to become worried that perhaps he had misinterpreted the drawings attached to Addendum 2. Intervenor's President called the School Board Architect and asked for confirmation of his interpretation to the effect that the bidders should base their estimates on the boxed elevation numbers on the drawing attached to Addendum 2. The architect confirmed that the Intervenor's President had correctly interpreted the drawing. The architect did not call any other potential bidders to tell them they should use the boxed numbers because he thought it was obvious that all potential bidders should use the boxed numbers. The bids for the subject project were opened on March 3, 1994. The Petitioner was the apparent responsive low bidder for the base bid. The Intervenor was the apparent responsive low bidder taking together the base bid and the bids on Alternates 1 and 2. The School Board published notice of its intent to award a contract to the Intervenor for the base bid and Alternates 1 and 2. The Instructions To Bidders portion of the subject bid specifications included the following provisions: BIDDER'S REPRESENTATIONS: Each Bidder, by making his Bid, represents that he has read and understands the Bidding Documents. Each Bidder, by making his Bid, represents that he has visited the site and familiarized himself with the local conditions under which the Work is to be performed. BIDDING PROCEDURES: * * * 3.11 Familiarity with Laws: The Bidder is assumed to be familiar with all Federal, State and Local Laws, Ordinances, Rules and Regulations, that in any manner affect the Work. Public Contracting and Purchasing Process Florida Statute, Section 287.132-.133 (Public Entity Crimes) is applicable. Ignorance on the part of the Bidder will in no way relieve him from responsibility. * * * AWARD OF CONTRACT: The Contract, if awarded by the Owner, will be awarded to the lowest bona fide responsible Bidder; provided the Bid is reasonable and it is in the interest of the Owner to accept the Bid. The method of determining the lowest bona fide Bid from Bidders shall be the Base Bid price plus or minus Alternate Prices listed on the Bid Proposal Form which are accepted by the Owner. Alternates will be considered for acceptance by the Owner as set forth in the Alternate section of the Specifications, Division One-General Requirements, Section 01030-Alternates. * * * BID PROTEST PROCEDURES: * * * 10.02 The Bid Documents/"Advertisement tol Bid" will be posted in the office of thel Department of Capital Projects at the time of the solicitation to Contractors. Any person who is affected adversely with respect to the Bid Documents shall file a notice of protest in writing within seventy-two (72) hours after the receipt of the Bid Documents, and SHALL FILE A FORMAL WRITTEN PROTEST WITHIN TEN (10) DAYS AFTER THE DATE HE FILED THE NOTICE OF PROTEST. Failure to file a notice of protest or failure to file a formal written protest shall constitute a waiver of proceedings under Chapter 120. It is important to the proper functioning of the public works bidding process that all bidders be treated alike. To this end, important information furnished to one potential bidder should be furnished to all other potential bidders.

Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the School Board enter a Final Order in this case dismissing the protest of the Petitioner and awarding a contract to the Intervenor for the base bid and Alternates 1 and 2. DONE AND ENTERED this 17th day of May 1994 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of May 1994. APPENDIX The following rulings are the specific rulings on all proposed findings of fact submitted by all parties: Findings submitted by Petitioner. Paragraphs 1 through 5: Accepted in whole or in substance. Paragraph 6: Rejected as not completely accurate. The practices described are common, but not universal. Drawings usually have a legend to explain the difference between existing elevations and elevations to be achieved. Paragraph 7: The first sentence of this paragraph is rejected as contrary to the greater weight of the evidence. The remainder is accepted in substance. Paragraph 8: The first sentence of this paragraph is rejected as constituting subordinate and unnecessary details. The last sentence of this paragraph is rejected as constituting inferences or arguments not supported by the greater weight of the evidence. Paragraphs 9, 10, and 11: Accepted in substance, but with some modifications in the interest of clarity and accuracy. Paragraph 12: Rejected as contrary to the greater weight of the evidence. Paragraph 13: Accepted in part. Accepted that if the Petitioner had used the boxed elevation numbers, it's proposal on Alternate 1 would probably have been substantially lower. The remainder of this paragraph is rejected as speculation Paragraph 14: Rejected as not fully supported by competent substantial evidence and as, in any event, subordinate and unnecessary details. Paragraph 15: Rejected as constituting primarily argument, rather than proposed findings of fact. To the extent the material in this paragraph purports to be factual, it tends to be contrary to the greater weight of the evidence. The greater weight of the evidence is to the effect that there were no ambiguities in Addendum 2 that could not have been resolved by careful site inspection. Paragraph 16: Accepted in substance. Paragraph 17: Rejected as constituting subordinate and unnecessary details. Paragraph 18: Rejected as contrary to the greater weight of the evidence; careful site inspection would have confirmed that the boxed numbers represented the existing elevations. Paragraph 19: Accepted. Paragraph 20: Rejected as speculative and as not supported by persuasive competent substantial evidence. Paragraph 21: Rejected as constituting a proposed ultimate conclusion of law, rather than a proposed finding of fact, and as, in any event, a conclusion that is not warranted by the evidence. Findings submitted by Respondent. Paragraphs 1 through 8: Accepted in whole or in substance. Paragraph 9: Rejected as constituting subordinate and unnecessary details. Paragraph 10: Accepted in substance. Paragraph 11: Rejected as constituting subordinate and unnecessary details. Paragraph 12: Rejected as constitution a proposed ultimate conclusion of law, rather than a proposed finding of fact. (The conclusion is warranted, but it is a conclusion nevertheless.) Findings submitted by Intervenor: (No separate proposals; the Intervenor adopted the proposed findings of the Respondent.) COPIES FURNISHED: Robert A. Rosillo, Esquire School Board of Palm Beach County 3318 Forest Hill Boulevard, Suite C-302 West Palm Beach, Florida 33406-5813 Alan C. Brandt, Jr., Esquire Leiby, Ferencik, Libanoff and Brandt Suite 400 150 South Pine Island Road Fort Lauderdale, Florida 33324 Richard B. Warren, Esquire Kelley, Aldrich & Warren, P.A. 801 Spencer Drive West Palm Beach, Florida 33409 Dr. C. Monica Uhlhorn, Superintendent Palm Beach County School Board 3340 Forest Hill Boulevard West Palm Beach, Florida 33406-5869

Florida Laws (2) 120.572.01
# 8
GULF SOUTH REALTY, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003765BID (1988)
Division of Administrative Hearings, Florida Number: 88-003765BID Latest Update: Dec. 09, 1988

Findings Of Fact During March 1988, the Respondent issued an Invitation to Bid by which it sought to lease 17,973 net usable square feet of office space to be located within a specified geographic area in Tampa, Florida, under a nine year lease with two additional three year option periods. This Invitation to Bid is referred to as Lease Number 590:1927. Three bids were received in response to the Invitation to Bid, and they were opened on May 13, 1988. Bids were received from the Petitioner, 8900 Centre, Ltd., and the Allen Morris Management Company. All bidders were determined to be responsive to the Invitation to Bid. Despite the fact that petitioner submitted the lowest bid, Respondent notified Petitioner by letter dated June 10, 1988, of its intent to award Lease Number 590:1927 to 8900 Centre, Ltd., as the lowest and best bidder. Petitioner has timely filed its protest seeking review of that decision. It is undisputed that Petitioner submitted the lowest bid. For the first year of the lease, Petitioner bid $7.85 per square foot, while 8900 Centre bid $7.95 per square foot. Thereafter, Petitioner proposed a yearly increase of 50 cents per square foot, reaching $11.85 per square foot in the ninth year of the lease, while 8900 Centre proposed annual increases of approximately 75 cents, reaching $14.00 per square foot in the ninth year. This equates to an actual dollar difference over the nine year term of approximately 185,000. However, using a present value methodology and a present value discount rate of 8.81 percent referred to on page 17 of the bid submittal form, the present value difference in these two bids is approximately $1,000 per month, which would result in a present value difference between Petitioner and 8900 Centre of approximately $108,000 over the nine year period. Neither the Invitation to Bid, bid specifications, nor the actual bids were offered into evidence. One page of the bid submittal form, designated as page 17 of 18, was offered and received in evidence. This portion of the bid submittal form states that the "successful bid will be that one determined to be the lowest and best." It also sets forth evaluation criteria, and assigns weights to each criteria. The evaluation criteria include associated fiscal costs (35 points), location (40 points) and facility factors (25 points) . A synopsis of bids was also offered and received in evidence showing the points awarded to each bidder by the Respondent's bid evaluation committed. Out of a possible 100 points, 8900 Centre received 95.17 points, while Petitioner received 82.25 points and the Allen Morris Management Company received 70.67 points. Petitioner asserts that the members of the evaluation committee were not qualified or knowledgeable in basic construction, design and engineering principles, and therefore could not competently evaluate the bids submitted. However, Petitioner did not offer competent substantial evidence to support this contention. Only the chairperson of the committee, Susan Jennings, was called to testify, and she appeared thoroughly knowledgeable in the bid process, the needs of the agency, the bid requirements and the representations made to the committee members by each bidder, including Petitioner, when the committee made its site visit to each location. Since the actual Invitation to Bid, bid specifications, and evidence about the other committee members were not introduced, it is not possible to know what the specific duties of the committee were, how they were to carry out their duties their qualifications and training, and whether they failed to competently carry out these duties, as alleged by Petitioner. Despite Petitioner's lower bid, Respondent awarded this lease to 8900 Centre, Ltd., based upon the evaluation committee's determination assigning 8900 Centre the highest number of evaluation points. Out of a possible 35 points for fiscal costs, Petitioner received 34 and 8900 Centre received 31.5. Thus, Petitioner's status as low bidder is reflected in the points awarded by the committee. Since neither the bid invitation or specifications were introduced, no finding can be made as to whether the difference between these two bidders comports with any instructions or directions provided by the agency to potential bidders, or whether this difference of 2.5 points on this criteria reasonably reflects and accounts for the dollar difference in these two bids. Petitioner received 34.75 points out of a possible 40 points on the general evaluation criteria "location," while 8900 Centre received the full 40 points. Within this criteria, there were three subcategories, and on the first two subcategories (central area and public transportation) there was an insignificant difference of less than one-half point between Petitioner and 8900 Centre. The major difference between these two bidders which accounts for their significant difference on the location criteria, was in the subcategory of environmental factors, in which Petitioner received 15.17 points and 8900 Centre received the full 20 points. Petitioner did not present competent substantial evidence to discredit or refute the committee's evaluation in the subcategory of environmental factors. To the contrary, the only testimony from a committee member was that of Susan Jennings, and according to her, Petitioner failed to explain the availability of individual air conditioning and heating controls, or the possibility of separate program entrances, which could be made available under its bid. Although Petitioner sought to explain at hearing that these desires of the agency could be accommodated in its bid, there is no evidence that such an explanation was provided in its bid or during the bid process when the evaluation committee visited the Petitioner's site. The committee was aware, however, that 8900 Centre would provide individual heating and air conditioning controls, as well as separate outside entrances for the three programs which would occupy the leased space. Additionally, the committee was concerned, according to Jennings, that parking areas at Petitioner's facility were more remote and removed from the building entrance than at 8900 Centre, and were somewhat obscured by trees and shrubbery, thereby presenting a potential safety concern for employees working after dark. Finally, every employee would either have a window or window access at 8900 Centre, while it was not explained that Petitioner's site would offer a similar feature. Thus, Petitioner failed to establish that the evaluation committee erred in assigning a significantly greater number of points for environmental factors to 8900 Centre than to Petitioner. The evidence reflects a reasonable basis for this difference. The other significant difference between these two bidders was in the subcategory for layout and utilization under the evaluation criteria "facility." Petitioner received 13.67 points while 8900 Centre received a full 20 points. Jennings explained that the separate outside entrances leading directly into the three programs that would occupy this space was preferred to a single reception area for all three programs. Petitioner offered the single reception area in its bid and site visit presentation, while 8900 Centre made it clear that each program would have its own entrance. Since these programs do not have a receptionist position, and none wanted to give up a secretarial position to serve as receptionist for all three programs, the committee did not consider the single reception area entrance to be desirable. Additionally, Petitioner's facility was a two-story building, while 8900 Centre is a single story facility. Jennings explained that the committee considered a ground level facility to be preferable to a two story building, particularly since the Medicaid program was to occupy the major portion of this space. The Medicaid program would have to be split up at Petitioner's facility, either in two separate buildings or on two levels of the same building, while at 8900 Centre, Medicaid could be accommodated in one, single story building, with the other two programs in a second, single story building. Finally, parking at 8900 Centre was directly next to, and outside the entrance of the building, while Petitioner offered to make assigned spaces available in a general parking area which serves its entire 100,000 square foot complex. The parking offered by Petitioner is more remote than that offered by 8900 Centre, and would be less secure at night due to a greater distance from the building entrances and the parking lot. Thus, Petitioner failed to establish that the committee erred in assigning a significantly greater number of points for layout and utilization to 8900 Centre than to Petitioner. There is a reasonable basis for this difference, according to the evidence in the record.

Recommendation Based upon the foregoing, it is recommended that Respondent enter a Final Order dismissing Petitioner's protest to Lease Number 590:1927. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 9th day of December 1988. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1050 Filed with the Clerk of the Division of Administrative Hearings this 9th day of December 1988. APPENDIX (DOAH Case Number 88-3765 BID) Rulings on Petitioner's Proposed Findings of Fact: Adopted, in part, in Finding of Fact 1, but Rejected in Finding of Fact 10, and otherwise as not based on competent substantial evidence in the record. Adopted in Finding of Fact 5. 3-5. Adopted in Finding of Fact 4, but Rejected in 7. 6-7. Rejected in Finding of Fact 8. Rejected in Finding of Fact 10, and otherwise as not based on competent substantial evidence in the record. Rejected in Findings of Fact 9 and 10, and otherwise as not based on competent substantial evidence. Rulings on the Respondent's Proposed Findings of Fact: Adopted in part in Finding of Fact 1, but otherwise rejected as not based on competent substantial evidence. Adopted in Finding of Fact 4. 3-4. Adopted in part in Findings of Fact 5 and 6, but otherwise rejected as not based on competent substantial evidence in the record of this case. Adopted In Findings of Fact 5, 7-10. Adopted in Finding of Fact 5. Adopted in Finding of Fact 7. Adopted in Finding of Fact 8. Rejected as irrelevant and unnecessary since the point difference in this subcategory is insignificant. Adopted in Finding of Fact 9. 11-12. Adopted in Finding of fact 10. COPIES FURNISHED: Michael V. Giordano, Esquire 7821 North Dale Mabry Suite 100 Tampa, Florida 33614 Jack Farley, Esquire W. T. Edwards Facility 4000 West Buffalo Fifth Floor, Room 520 Tampa, Florida 33614 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (2) 120.53120.57
# 9
PROFESSIONAL CENTRE, IV, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 90-004063BID (1990)
Division of Administrative Hearings, Florida Filed:Miami, Florida Jun. 29, 1990 Number: 90-004063BID Latest Update: Aug. 06, 1990

Findings Of Fact The invitation for bid regarding Lease No. 590:2169 solicited bids for a 10 year lease of existing office space for occupancy on October 1, 1990. The invitation for bid consisted of 13 pages and solicited bids for approximately 10,633 net rentable square feet located within a prescribed area in Florida City, Florida (the "IFB"). All bids were required to be submitted on a form entitled the "Bid Submittal Form". Any bids not submitted on the Bid Submittal Form were required to be rejected pursuant to the terms of paragraph 1, page 6 of the IFB. The Bid Submittal Form consisted of 24 pages. The Bid Submittal Form at paragraph 22, page 12, required Petitioner to include a certification letter from a licensed heating, ventilation, and air conditioning contractor attesting to the age and condition of the heating or cooling system existing in the proposed lease space, if any (a "certification letter"). No certification letter was required if the proposed lease space had no cooling or heating system in place. A portion of Petitioner's proposed lease space was air conditioned. Petitioner did not submit the requisite certification letter. Respondent had no reasonable basis to know from Petitioner's Bid Submittal Form that the proposed lease space had an existing heating or cooling system. Pictures of the proposed lease space disclosed that part of the proposed lease space was enclosed. The pictures were not a sufficient basis for Respondent to conclude that an existing air conditioning system was in place. Petitioner's proposed lease space was in apparent need of renovation before it was tenable for Respondent's needs. Petitioner's failure to submit a certification letter would have been consistent with a conclusion that no adequate, existing cooling system was in place and that a new cooling ard heating system would be needed as part of the renovation of the proposed lease space. The Bid Submittal Form, at Paragraph 11, page 5, required any bidder with proposed lease space that was partially or wholly occupied, either at the time of the submission of the bid proposal or at the time of the proposed occupancy date (October 1, 1990), to submit written documentation by the tenants indicating each tenant's acknowledgment of the lessor's bid and each tenant's ability to vacate the proposed lease space by the proposed occupancy date (or earlier date if renovation was required). The IFB, paragraph 7, page 13, also listed existing tenant acknowledgments as one of the types of documents required to be submitted by any bidder with lease space occupied by existing tenants. A portion of Petitioner's proposed lease space was occupied by tenants at the time that the Bid Submittal Form was prepared and submitted by Petitioner. Petitioner never physically inspected the proposed lease space. Petitioner's Bid Submittal Form represented that there were month-to-month tenants in the proposed lease space but that the requirement for existing tenant acknowledgments was "not applicable". Contrary to the requirements of the Bid Submittal Form and IFB, Petitioner submitted no existing tenant acknowledgments. Petitioner had control of its proposed lease space within the meaning of the IFB, paragraph 1, page 3. Petitioner had a contractual right to purchase the proposed lease space pursuant to a Deposit and Sale-Purchase Agreement dated March 30, 1990 (the "Purchase Agreement"). A copy of the Purchase Agreement was attached to Petitioner's Bid Submittal Form. The Addendum to the Purchase Agreement provided in relevant part that Petitioner would purchase the proposed lease space subject to the occupancy of any and all tenants in possession. Respondent determined that Petitioner's bid proposal was not responsive because the Bid Submittai Form prepared and submitted by Petitioner failed to include both the certification letter and the existing tenant acknowledgments. Each such omission was determined to be a material deviation from the bid requirements by Samir Elmir, Facilities Management Assistant for Respondent at the time of the bids were opened on April 2, 1990. The initial determination of non-responsiveness by Mr. Elmir was confirmed by Luis Cerezo, Facilities Services Manager for Respondent who was also present at the bid openings. Their determination of non-responsiveness was confirmed by Warner Von Werne, Acting General Services Manager. 1/ Petitioner was advised of the non-responsiveness of its bid proposal at the time of the bid openings by deficiencies noted on the Bid Technical Responsiveness Checklist (the "Checklist"). The Checklist was completed and marked "Non-Responsive" by Mr. Elmir aid delivered to Petitioner.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner's written formal protest be DENIED. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 6th day of August, 1990. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division Administrative Hearings this 6th day of August, 1990.

Florida Laws (1) 120.57