MARPAN SUPPLY COMPANY, INC. vs DEPARTMENT OF MANAGEMENT SERVICES, 96-002777BID (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jun. 11, 1996 Number: 96-002777BID Latest Update: Nov. 26, 1996

The Issue The issue for determination is whether Respondent acted fraudulently, arbitrarily, illegally, or dishonestly in selecting Intervenor as the lowest bidder for a contract to supply the state with lamps valued at $3,692,499.

Findings Of Fact The Parties Respondent is the state agency responsible for soliciting bids to establish a contract for the purchase of large lamps by state agencies and other eligible users. Petitioner is a Florida corporation and the incumbent vendor under similar contracts for the preceding 10 years. Petitioner does not manufacture lamps. Petitioner sells lamps manufactured by Osram-Sylvania ("Sylvania"). Intervenor is an Ohio corporation doing business in Florida. Intervenor manufactures the lamps it sells. The ITB On March 15, 1996, Respondent issued Invitation To Bid Number 39-285- 400-H, Lamps, Large, Photo and STTV (the "ITB"). The purpose of the ITB is to establish a 24 month contract for the purchase of Large Lamps (fluorescent, incandescent, etc.), Photo Lamps (audio visual, projection, flash), and Studio, Theatre, Television, and Video Lamps ("STTV") by state agencies and other eligible users. The contract runs from July 10, 1996, through July 9, 1998. The ITB estimates the contract price at $3,692,499. The ITB contains General and Special Conditions. General Conditions are set forth in 30 numbered paragraphs and elsewhere in DMS Form PUR 7027. Special Conditions are set forth in various unnumbered paragraphs in the ITB. General Conditions Paragraphs 5, 11, and 24 of the General Conditions are at issue in this proceeding. The terms of each paragraph are: 5. ADDITIONAL TERMS AND CONDITIONS: No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and effect and are inapplicable to this bid. If submitted either purposely through intent or design or inadvertently appearing separately in transmittal letters, specifications, literature, price lists, or warranties, it is understood and agreed the general and special conditions in this bid solicitation are the only conditions applicable to this bid and the bidder's authorized signature affixed to the bidder's acknowledgment form attests to this. 11. QUALITY ASSURANCE: The contractor, during the contract term, upon mutual agree- ment with the Division of Purchasing, will provide reasonable travel and lodging accommodations for one (1) to three (3) government employees to perform an on-site inspection of the manufacturing process(es) and review of the manufacturer's product quality control(s) and total quality manage- ment program(s). The contractor will reim- burse the State for actual transportation cost, per diem and incidental expenses as provided in Section 112.061, F.S. It is the State's desire that the contractor provide demonstration of quality control for improvement rather than post production detection. 24. FACILITIES: The State reserves the right to inspect the bidder's facilities at any reasonable time with prior notice. Included Items Special Conditions in the ITB require bidders to submit prices for "Item 1" and "Item 2" lamps ("included items"). 1/ Item 1 lamps consist of Group 1 and 2 lamps. Group 1 lamps are Large Lamps such as fluorescent, incandescent, quartz, mercury vapor, metal halide, and high-pressure sodium lamps. Group 2 lamps are Photo Lamps such as audio visual, projection, flash, and STTV lamps. The total price for each group is multiplied by a weighted usage factor. The product calculated for Group 1 is added to the product calculated for Group 2 to determine the total price for Item 1 lamps. Item 2 consists of a category of lamps described as "T- 10 Lamps." The total price for Item 2 lamps is determined without application of the weighted usage factor used for Item 1 lamps. The total price for Item 2 lamps is a de minimis portion of the contract price. Special Conditions in the ITB require Respondent to award a single contract for included items to a single bidder. Special Conditions state that, "During the term of the contract established by this bid, all purchases of items will be made from the successful bidder." 2/ Excluded Items Special Conditions require that, "The bidder shall offer a fixed discount from retail prices on all excluded items." Excluded items include high technology lamps. The requirement for a fixed discount on excluded items is not considered in evaluating bid prices for included items. Rather, the requirement is intended to reduce the state's cost for both included and excluded items by assuring a meaningful discount on excluded items. Formatting Requirements Special Conditions prescribe the format in which bids must be submitted. Price lists and authorized dealers' lists are required to be submitted in hard copy and on computer diskette. The format prescribed for computer diskette includes requirements for font and graphics. The Special Conditions state that, "Failure to comply with this requirement will result in disqualification of your bid." The Bids The ITB prohibits the alteration of bids after they are opened. Respondent opened bids on April 10, 1996. Seven vendors submitted bids in response to the ITB. Included Items Four vendors, including Petitioner, submitted a bid for both Item 1 and Item 2 lamps. Intervenor and two other bidders did not submit a bid for Item 2 lamps. General Conditions Intervenor deleted paragraphs 11 and 24 of the General Conditions from its bid. At the direction of Intervenor's legal department in Cleveland, Ohio, Intervenor's regional sales manager struck through paragraphs 11 and 24 and initialed the deletions. The deletions are consistent with Intervenor's corporate policy. Intervenor routinely objects to contract provisions requiring inspection of Intervenor's facilities. Excluded Items Petitioner's bid includes a fixed discount of 44 percent on excluded items. Intervenor's bid includes a fixed discount of 0 percent. Formatting Requirements Intervenor included the information required by the ITB on the diskette it submitted with its bid. However, Intervenor supplied the information in Courier 12 characters per inch ("cpi") font, not the Courier 10 cpi font prescribed in the ITB. Proposed Agency Action Respondent determined that Intervenor's bid was responsive. The purchasing specialist for Respondent who reviewed each bid to determine if it was responsive failed to observe the deleted paragraphs in Intervenor's bid. The purchasing specialist forwarded those bids determined to be responsive to the purchasing analyst assigned by Respondent to: determine if the lamps offered in each bid met the specifications prescribed in the ITB; and evaluate bid prices. The purchasing analyst noted that paragraphs 11 and 24 were deleted from Intervenor's bid. The purchasing analyst and purchasing specialist conferred. They determined that paragraph 5 of the General Conditions cured Intervenor's deletions without further action. The purchasing analyst correctly determined: that lamps offered by Petitioner and Intervenor met ITB specifications; that Intervenor's bid is the lowest bid for Item 1 lamps; that Petitioner's bid is the second lowest such bid; and that Petitioner's bid is the lowest bid for Item 2 lamps. Petitioner's bid for Item 1 lamps is approximately five percent greater than Intervenor's bid. Respondent proposes to award one contract for Item 1 lamps to Intervenor. Respondent proposes to award a second contract for Item 2 lamps to Petitioner. At 4:00 p.m. on May 20, 1996, Respondent posted its intent to award the contract for Item 1 lamps to Intervenor. Petitioner timely filed its formal protest on June 3, 1996. Respondent did not award a contract for excluded items. Respondent's failure to award a contract for excluded items is not at issue in this proceeding. Arbitrary Respondent's proposed award of a contract to Intervenor for substantially all of the items included in the ITB is a decisive decision that Respondent made for reasons, and pursuant to procedures, not governed by any fixed rule or standard prescribed either in the ITB or outside the ITB. Respondent's proposed agency action is arbitrary. Excluded Items The requirement for bidders to offer a fixed discount on excluded items operates synergistically with the requirement for Respondent to award a single contract on included items to a single bidder. The combined action of the two requirements operating together has greater total effect than the effect that would be achieved by each requirement operating independently. The requirement for a fixed discount on excluded items, operating alone, may not induce a bidder who could receive a contract solely for Item 2 lamps to offer a discount that is as meaningful as the discount the bidder might offer if the bidder were assured of receiving a contract for Item 1 and 2 lamps upon selection as the lowest bidder. 3/ By assuring bidders that a single contract for Item 1 and 2 lamps will be awarded to a single bidder, the ITB creates an economic incentive for bidders to provide a meaningful discount on excluded items. Respondent frustrated the synergy intended by the ITB by applying the requirements for a fixed discount and for a single contract independently. Respondent penalized the bidder conforming to the requirement for a fixed discount on excluded items by awarding only a de minimis portion of the contract to the bidder. Respondent rewarded the bidder not conforming to the requirement for a fixed discount on excluded items by awarding substantially all of the contract to that bidder. If Respondent elects to purchase all excluded items from Petitioner, Respondent will have used the contract for Item 1 lamps to induce a meaningful discount from Petitioner without awarding Petitioner with the concomitant economic incentive intended by the ITB. Such a result frustrates the ITB's intent. Paragraph 5 Respondent's interpretation of paragraph 5 fails to explicate its proposed agency action. Respondent's interpretation of paragraph 5: leads to an absurd result; is inconsistent with the plain and ordinary meaning of the terms of the ITB; and is inconsistent with Respondent's actions. Respondent's interpretation imbues paragraph 5 with limitless curative powers. Respondent's interpretation empowers paragraph 5 to cure the deletion of all General Conditions in the ITB whether stricken by pen or excised with scissors. Respondent's interpretation of paragraph 5 would transform a bid containing no General Conditions into a responsive bid. Respondent's interpretation of paragraph 5 is inconsistent with the plain and ordinary meaning of its terms. Paragraph 5 operates to cure "additional" terms. It does not operate to restore deleted terms. Respondent's interpretation of paragraph 5 is inconsistent with Respondent's actions. Respondent did not rely on paragraph 5 to cure Intervenor's deletions without further action. Respondent took further action to cure the deletions. Further Action On the morning of May 20, 1996, the purchasing analyst for Respondent telephoned Intervenor's regional sales manager. The purchasing analyst demanded that Intervenor accept the conditions Intervenor had deleted from its bid by submitting a letter of acceptance before the bid tabulations were posted at 4:00 p.m. on the same day. The regional sales manager contacted Intervenor's corporate headquarters in Cleveland, Ohio. Intervenor authorized the regional sales manager to accept the deleted paragraphs. By letter faxed to Respondent at approximately 3:20 p.m. on May 20, 1996, Intervenor accepted the paragraphs it had previously deleted. The letter stated that, "GE Lighting [will accept] the Contract Conditions noted in Paragraphs 11 and 24 of the Lamp Quotation." [emphasis not supplied] At 4:00 p.m. on May 20, 1996, Respondent posted the bid tabulation form. The bid tabulation form stated that the "award is contingent upon General Electric's acceptance of all the terms in conditions (sic)" in the ITB. Respondent argues that the purchasing analyst who contacted Intervenor on the morning of May 20, 1996, exceeded her authority. Respondent characterizes the word "contingent" in the bid tabulation form as "poorly written" and a "bad word." Agency Construction Of ITB Terms Respondent construes terms in the ITB in a manner that is inconsistent with their plain and ordinary meaning. The ITB requires that, "The bidder [shall] offer a fixed discount from retail price list on all excluded items." [emphasis supplied] Respondent interprets the quoted provision as meaning the bidder may offer such a fixed discount if the bidder elects to do so. The purpose of the ITB is to establish "[a] 24 month contract" to supply large lamps to the state. [emphasis supplied] Respondent interprets the quoted provision as meaning that the purpose of the ITB is to establish two contracts. The ITB states that, "During the term of the contract established by this bid, all purchases of items [will] be made from [the] successful bidder." [emphasis supplied] Respondent interprets the quoted provision as meaning that purchases of some items will be made from one successful bidder and that purchases of other items will be made from a second successful bidder. The ITB states that the contract "[shall] be made statewide on an all or none basis" to the responsive bidder who satisfies the conjunctive requirements for: "[the] lowest "Award Figure Item (1; [and] lowest Award figure for Item (2." [emphasis supplied] Respondent interprets the quoted provision as meaning that separate contracts may be made statewide on less than an all or none basis to separate responsive bidders who satisfy the disjunctive requirements for either the lowest bid for Item 1 lamps or the lowest bid for Item 2 lamps, or both. The ITB requires offers to be submitted for all items listed within a group for a bid to qualify for evaluation. Respondent interprets the requirement as meaning that a bidder who does not qualify for evaluation for all of the groups in the contract nevertheless qualifies for evaluation for the contract. Finally, the ITB states that failure to comply with the formatting requirements for the diskette "[will] result in disqualification of your bid." [emphasis supplied] Respondent interprets the quoted language to mean that failure to comply with prescribed formatting requirements may result in disqualification of a bid. The interpretations of the quoted terms proposed by Respondent, individually and collectively, frustrate the purpose of the ITB. They also ignore material requirements of the ITB. Material Deviation Respondent deviated from the rule or standard fixed in the ITB in several respects. First, Respondent altered the bid evaluation procedure prescribed in the ITB. Second, Respondent ignored the requirement to award a single contract to a single bidder. Third, Respondent ignored the requirement that bidders provide a fixed discount on excluded items. Fourth, Respondent ignored the requirement to comply with the formatting requirements prescribed in the ITB. Each deviation from the rule or standard fixed in the ITB is a material deviation. Each deviation gives Intervenor a benefit not enjoyed by other bidders. Each deviation affects the contract price and adversely impacts the interests of Respondent. 4/ 5.5(a) Benefit Not Enjoyed By Others Intervenor enjoyed a benefit not enjoyed by other bidders. Intervenor obtained a competitive advantage and a palpable economic benefit. Respondent altered the bid evaluation procedure prescribed in the ITB. On the morning of May 20, 1996, Respondent disclosed the bid tabulations to Intervenor alone, 5/ gave Intervenor an opportunity that lasted most of the business day to determine whether it would elect to escape responsibility for its original bid, allowed Intervenor to cure the defects in its bid, accepted Intervenor's altered bid, and conditioned the bid tabulations on Intervenor's altered bid. Respondent used a bid evaluation procedure that is not prescribed in the ITB and did not allow other bidders to participate in such a procedure. 6/ In effect, Respondent rejected Intervenor's initial bid, with paragraphs 11 and 24 deleted, and made a counter offer to Intervenor to accept a bid with paragraphs 11 and 24 restored. Intervenor accepted Respondent's counter offer. Respondent excluded other bidders from that process. Respondent gave Intervenor an opportunity to determine whether it would elect: to escape responsibility for its original bid by declining Respondent's counter offer; or to perform in accordance with an altered bid by restoring paragraphs 11 and 24. A bidder able to elect not to perform in accordance with its bid has a substantial competitive advantage over other bidders unable to escape responsibility for their bids. 7/ Respondent awarded substantially all of the contract to Intervenor even though Intervenor failed to provide a meaningful discount on excluded items. Respondent provided Intervenor with a palpable economic benefit. 5.5(b) Bid Price And Adverse Impact On The State Respondent did not award a contract for excluded items. Respondent's proposed agency action allows Respondent to purchase excluded items from either Intervenor or Petitioner. If Respondent were to purchase all of the excluded items it needs from Intervenor, Respondent could pay substantially more for excluded items than Respondent would save from the five percent price advantage in Intervenor's bid for Item 1 lamps. In such a case, Respondent's proposed agency action would effectively increase costs to the state that are inherent, but not stated, in the ITB. 8/ Conversion of incorrectly formatted data to the required font shifts prices to incorrect columns and causes other problems in accessing information in the diskette. Such problems can not be rectified easily but require substantial time and effort. Responsive Bidder Respondent did not award the contract intended by the ITB to the lowest responsive bid. Although Intervenor's bid is the lowest bid for Item 1 lamps, it is not the lowest responsive bid for Item 1 and 2 lamps. Petitioner's bid is the lowest responsive bid for Item 1 and 2 lamps. 9/ Respondent is statutorily required to award the contract to the lowest responsive bidder. 10/ Illegal Intervenor's bid is not responsive within the meaning of Sections 287.012(17), Florida Statutes (1995). 11/ It does not conform in all material respects to the ITB. Intervenor's unaltered bid deletes paragraphs 11 and 24. It does not include a fixed discount on excluded items, does not include a bid for Item 2 lamps, and does not conform to the formatting requirements in the ITB. Section 287.057 requires Respondent to award the contract to the bidder who submits the lowest responsive bid. Respondent has no authority either: to consider bids that are not responsive; or to award the contract to a bidder other than the lowest responsive bidder. Respondent's attempt to engage in either activity is ultra vires and illegal. Minor Irregularities The ITB encourages, but does require, bidders to include quantity discounts for Item 1 and 2 lamps. Petitioner's bid does not include quantity discounts. Petitioner's bid does not fail to conform to material requirements in the ITB. Petitioner does not manufacture Item 1 and 2 lamps. Sylvania manufactures the lamps Petitioner sells. Petitioner has no legal right to require Sylvania to allow inspection of its facilities pursuant to paragraph 11 of the General Conditions. Petitioner's ability to provide the requisite inspections requires the cooperation of Sylvania. Petitioner's bid requires payment by the state within 30 days of an invoice. Section 215.422 and the ITB provide that Respondent has 40 days to issue warrants in payment of contract debts and that interest does not accrue until after 40 days. The defects in Petitioner's bid are minor irregularities within the meaning of Florida Administrative Code Rule 60A-1.001(16). 12/ They neither affect the bid price, give Petitioner a competitive advantage, nor adversely impact Respondent's interests. Petitioner has the practical ability to arrange inspection's of Sylvania's facilities. Petitioner is legally responsible for failing to do so. Respondent's employees have never visited Sylvania's facilities during the 10 years in which Petitioner has been the contract vendor to the state. The requirement for payment within 30 days does not obviate the provisions of Section 215.422. Private contracts can not alter mutually exclusive statutory provisions.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order granting Petitioner's protest of Respondent's proposed agency action. RECOMMENDED this 26th day of September, 1996, in Tallahassee, Florida. DANIEL S. MANRY, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of September, 1996.

Florida Laws (6) 112.061120.57215.422287.001287.012287.057 Florida Administrative Code (1) 60A-1.001
# 1
SUWANNEE VALLEY MEDICAL PERSONNEL CORPORATION vs DEPARTMENT OF CORRECTIONS, 89-004566BID (1989)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 24, 1989 Number: 89-004566BID Latest Update: Dec. 04, 1989

The Issue The issues are whether Personnel Pool of North Central Florida, Inc., d/b/a Medical Personnel Pool (MPP), is the lowest qualified bidder on Contract No. R- 2119 or whether Suwannee Valley Medical Personnel Corporation (Suwannee) is entitled to the award of Contract No. R-2119 or is entitled to have all bids rejected and the contract relet for bids.

Findings Of Fact The ITB on Contract No. R-2119 was developed jointly between the Department's Central Office and the Region II contracting staff. The Region II staff sent a draft of the ITB to the Central Office, where it was reviewed by Gerald Ellsworth, the Department's Human Service Program Specialist. Mr. Ellsworth is responsible for reviewing the Department's contracts and plans, as well as for development of the Department's proposed invitations to bid and other related types of documents. Mr. Ellsworth has considerable experience in drafting and reviewing governmental contracts for purchasing of services at the state, local and federal government levels. The ITB was also reviewed by the Department's legal office, the Office of Management and Budget and the Correctional Medical Authority, with regard to both the specifications and the contract language in the ITB. The Department properly published the ITB on or about June 28, 1989. The ITB was published under cover of a formal State of Florida Invitation to Bid for Contractual Services, Form PUR: 7031 (Rev. 10/18/88), containing the State of Florida standard general conditions for bids for contractual services. Among those conditions were detailed requirements regarding the sealed nature of bids, requirements for the execution of bids, requirements regarding the opening of bids and conditions regarding prices, terms and payment, interpretations and disputes, conflict of interest, awards, governmental restrictions, default, legal requirements, advertising, assignment, liability, facilities, cancellation and public records. The same general conditions on the first page of the ITB specifically provided an exclusive mechanism for the bidders to resolve questions and disputes regarding the conditions and specifications of the ITB: INTERPRETATIONS/DISPUTES: Any questions con- cerning conditions and specifications shall be directed in writing to this office for receipt no later than ten (10) days prior to the bid opening. Inquiries must reference the date of bid opening and bid number. No interpretation shall be considered binding unless provided in writing by the State of Florida in response to requests in full compliance with this provision. (Emphasis added.) The body of the ITB stated that the Department was soliciting bids for registered and licensed practical nurse services in the Department's Region II, on all shifts, for the care and treatment of inmate patients, as further defined in the ITB's section entitled "Responsibilities of Successful Bidder; Scope of Work." The ITB also contained detailed requirements regarding Nurse Professional Qualifications, Quality Management Standards, Scheduling of Nurses, Records, Invoicing, Insurance, Legal Requirements, Conflict of Interest, Unsatisfactory Performance, Brokering of Contract, Subcontracts, Verbal Instructions, detailed procedural requirements regarding the submission, review and evaluation of the bids, a description of the institutions covered and a copy of the sample contract. One of the procedural requirements in the body of the ITB repeated that: All inquiries from Bidder's [sic] concerning this Invitation to Bid shall be submitted in writing to the office identified on the cover of this Invitation to Bid. Such inquiries shall be received by the office on or before the date indicated above in the Calendar of Events as the "Last Day for Written Inquiries" [July 10, 1989]. (Emphasis added.) The ITB contained a "Bid Price Sheet" which contained separate blanks for RN and LPN services, separate blanks for each service for weekdays and weekend/holidays, and separate blanks for each of these categories for each of the three geographic areas of Region II, in each of the three years of the contract. That Bid Price Sheet stated that prices quoted "shall be firm net prices regardless of travel involved. . . " The body of the ITB specified that bidders must submit "all costs in the format specified on the Price Quote Sheet provided." (Emphasis added.) Further, the "Proposal Evaluations" section of the ITB specified that the figures to be inserted in the blanks on p. 15 were to be "hourly rates" for each type of nursing service. The next paragraph of this section of the ITB, however, stated that "Total cost, and cost breakouts on the Price Quote Sheet shall be clearly stated." The undisputed testimony of Gerald Ellsworth established that the intent of these provisions of the ITB was to require the bidders to state the total cost (i.e., net firm price) for each hour of nursing services in a particular geographic area at a particular point in time. Even though the ITB set forth an estimate of the hours that would be required under the contract, this information was clearly only in the nature of an estimate, and it was never the intent of the ITB to require the bidders or the Committee to project or evaluate, respectively, the total cost of the contract (as opposed to the total cost of each hour of service) by multiplying the bidders' bid costs for each hour of service by the corresponding estimate of hours needed over the three- year life of the contract for each of those categories. The primary reason for this focus upon the cost of an hour of service, rather than the cost of the entire contract, is that the estimated hours needed, as indicated by the ITB, are only estimates. Actual demands for service and workloads are likely to vary considerably, both by type of nursing position and geographic area. These demands could also vary as a result of factors such as the vacancy levels in the Department's own staff of employee nurses or changes in administrative personnel at a given institution. The ITB called for a mix of both objective and subjective evaluation of materials submitted by the bidders. The cost data, submitted in response to p. 7, para. E; p. 12, para. F.2.e; and p. 15, para. 7 was entirely objective, as was the Committee's role in evaluating that data. On the other hand, the information required from bidders under p. 12, para. F.2.a ("Project understanding and statement of work and reference from clients"), and p. 12, para. F.2.b ("Nurse Professional Qualifications"), called for a mix of both subjective and objective information and evaluation. The former, referred to throughout the testimony as "Criterion A," required the bidder to submit "a narrative statement of work to be performed, and references from clients in accordance with the specifications appearing at p. 4, para. 2.A. The latter, referred to in the testimony as "Criterion B," required bidders to: submit professional qualifications, experi- ence, and CPR certification for Department reviewers which documents the Bidders [sic] capability to provide registered and licensed practical nurse personnel that meet the training specifications. as set forth at pp. 4-5, para. 2.B. Within Criterion B, for example, an entirely objective requirement is the proof of the bidders' nurses' CPR qualification. A subjective element of this same criterion would be the quantity and quality of documentation of available nurses. The ITB required the Committee to award points to the respective bidders based on a formula which takes into account each of these objective and subjective criteria. That Formula, at its first level, assigned a point value of 20 points for Criterion A (Project understanding and statement of work, and references from clients), 30 points for Criterion B (Nurse Professional Qualifications) and 50 points for Criterion C (Bid Cost). Specifically as to Criterion C (Bid Cost), this criterion was entirely objective and did not require any subjective analysis by the Committee. The ITB specified that the lowest bidder "shall" be awarded 50 points, based on the average of the three years' quotes for cost of hours of nursing services. The ITB specified that the remaining bidders "shall" be awarded points for bid cost based on the following formula: Points Awarded Equals 50 x (1-A/B) where A equals the difference between the respective bidders' average bid and the lowest average bid, and B equals the lowest bidder's average bid. Unlike Criterion C, the Committee members' evaluation of the bidders' responses to Criteria A and B was left to their judgment and discretion. While the ITB set forth factors that were to be taken into consideration by the Committee members under these criteria, there was no required method by which an evaluator was to assign points for Criteria A and B. Specifically, there was no requirement in the ITB that the evaluators rank the bidders under Criteria A and B. An evaluator was free, for example, to give all bidders full point credit under either criterion, or to assign them any variation of points. This type of point system for mixed weighing of subjective and objective criteria is not unusual in governmental purchasing contracting and competitive bidding and is, in fact, normal procedure. The bid criteria set forth in the ITB, as well as the system set forth therein for evaluation of those bids by a mix of subjective and objective criteria, is rational. Further, and specifically, the ITB's requirement that costs be quoted as a rate per hour of service, by geographic area and point in time, is rational. It would be irrational to evaluate bid cost under this ITB by multiplying each bidder's price quotes for individual hours of service, broken down by geographic area and point in time, by the corresponding estimates of hours needed, set forth at p. 3 of the ITB, and then comparing the resulting "total cost" of the contract under each bid, since the estimated hours were intended to be no more than estimates, and the Department recognizes that these hours are subject to significant variation over the term of the contract. This probable variation would make the latter calculation entirely meaningless and baselessly speculative. It was not the intent of the ITB to find the "lowest and best" bidder. Instead, the intent of this ITB was to find the lowest bidder who met the qualifications and specifications set forth in the ITB. This is not the same as "lowest and best." The Bidders and Their Bids Medical Personnel Pool MPP, the successful bidder on Contract No. R-2119, timely submitted its bid for that contract. MPP's bid showed that MPP is a nationally recognized health care provider, with over twenty years of experience in serving the health care needs of both home health clients and facility clients. Its franchise office in Gainesville, Florida, is one of four offices operated in the Region II area by Mr. Ed Bixby, a former vice president of MPP's parent company, Personnel Pool of America, Inc. Mr. Bixby personally has over fifteen years of experience in medical staffing. All MPP offices follow the same national corporate standards for quality assurance, office operation and general business practice. Further, MPP is a financially sound and viable business, with an ongoing corporate recruitment program that regularly attracts new employees. MPP's client service representatives are on-call and available 24 hours a day, seven days a week, to meet the Department's staffing needs. The agency has been managed since October 1987, by Mr. Duane Gorgas, who has seventeen years of experience in facility clinical laboratory medicine, and who is licensed by the Department of Health and Rehabilitative Services as a clinical laboratory supervisor. MPP demonstrated compliance with Criterion B of the ITB by showing that each of its nurses is carefully and personally screened and tested for nursing skills prior to being sent into the field. In addition, MPP personally verifies all nurses' licenses with the Department of Professional Regulation, as well as their CPR certifications. A minimum of one year's documented current clinical experience is required prior to a nurse's being sent into the field. Further, MPP is itself an approved provider of nursing and other professional continuing education programs (DPR Provider No. 27M0938) and provides continuing education directly to its employees on a regular basis. MPP's Gainesville franchise already provides RN's and LPN's to correctional facilities, hospitals and nursing homes throughout sixteen counties in north central Florida. A list of the prisons and county jails currently and historically staffed by MPP in both Regions II and III was included in the bid, and includes thirteen corrections facilities in those two regions. A broad range of references from these and other clients, both institutional and personal, was included as Attachment II to MPP's bid. Copies of the licenses of 48 experienced MPP nurses, qualified and available to provide the services called for under Contract No. R-2119, were attached to the bid as Attachment III. Suwannee Suwannee's bid was also timely submitted. Whereas Suwannee now protests that the Department's manner of determining bid costs as net cost per hourly unit of service is irrational, that contention is belied by Suwannee's own bid. In the first place, Suwannee did not quote cost as a multiplication of hourly rates times total estimated hours anywhere in its bid, even though its president, Mr. Fortner, now contends this is the only rational way to quote or determine bid cost under the ITB. Further, Mr. Fortner expressly conceded that the ITB did not call for any such calculation of "total cost" by multiplication of rates by estimated hours. Even so, Suwannee has waived any objection or question it may now have as to the method of determining bid cost. Mr. Fortner conceded that he was fully aware of the standards set forth at pp. 1 and 11 of the ITB, requiring that questions or objections to the reasonableness, necessity or competitiveness of the terms and conditions of the ITB be submitted in writing in a timely manner prior to July 10, 1989. Mr. Fortner nevertheless conceded that he failed to submit any such questions or objections regarding the reasonableness, necessity or competitiveness of the terms and conditions of the ITB, until the filing of his protest after the award of the bid to MPP, and long after July 10, 1989. Having failed to file any timely written objections to the reasonableness, necessity or competitiveness of the terms and conditions of the ITB, therefore, Suwannee has waived any objections to the Department's method of calculating bid costs by averaging each bidder's unit net price for an hour of service by geographic area and point in time, as opposed to Suwannee's after- the-fact preferred method of multiplying these rates by estimated hours to determine Suwannee's definition of "total cost." Suwannee's bid, as supported by its president's testimony, showed that Suwannee was only incorporated in late July 1988, less than a year before the ITB was published. Prior to that time its then-22-year-old president's business experience consisted of operating a video store. Mr. Fortner conceded he had no prior experience whatsoever in providing any sort of nursing or medical services. Prior to the bid letting, Suwannee's sole experience in attempting to staff a correctional facility was at Baker Correctional Institute. Mr. Fortner testified that his first client was Lake City Medical Center, yet no reference from that facility appears in his bid. On the other hand, MPP's bid contains a highly favorable reference from Lake City Medical Center's director of nursing, indicating a completely satisfactory contractual relationship with MPP since 1987. Whereas MPP directly provides continuing education to its nurses under its own provider number, Suwannee takes the position that continuing education requirements are the nurses' responsibilities, and that they must meet these requirements at their own expense. Further, while Mr. Fortner stated that he believes Suwannee tests its nurses, he admitted he did not know how, and Suwannee's bid was silent on this aspect of Criterion B of the ITB. Suwannee's bid was also silent on screening of new nurse applicants. Suwannee has only recently hired a full-time director of nursing. Whereas MPP submitted qualifications for 48 nurses to staff the estimated hours under contract, Suwannee proposed to staff the same number of estimated hours with only 31 nurses. Mr. Fortner testified that the number of licenses in Suwannee's bid constitutes the full complement of nurses he deems necessary to provide the number of hours of service estimated in the ITB. The Bid Evaluation Process Objective Evaluation of Criterion C Initially, because of a confusing misprint in the ITB regarding the mathematical formula for calculating points to be awarded to bidders, other than the lowest average cost bidder, under Criterion C (bid cost), some of the four Bid Evaluation Committee members calculated the ranking of bidders under that criterion differently. That calculation was corrected by Dr. Rechtine, the Committee chairperson, however, in consultation with officials of the Region II office. The correction did not alter the ultimate overall ranking of the bidders, although it made slight differences in the points awarded individual bidders by some members of the Committee, and in one case the second and third bidders under Criterion C were reversed on one evaluator's tally sheet. All four of the Committee members testified that they agreed with the corrected calculation of points to be awarded each of the bidders under Criterion C. At no time was any other part of any Committee member's points awarded altered or changed. Subjective Evaluation of Criteria A and B Steven Smith Committee member Steven Smith, Regional Health Services Administrator for Region II, responsible for assisting institutions in the region with health service issues, including contracting for health services, evaluated the respective bids of MPP and Suwannee in a rational and reasoned manner. With respect to Criteria A and B, Mr. Smith thoroughly reviewed the entire bid document of each bidder and made judgments as to the merits of each bid. His evaluations were based on how the bidders presented their respective documents, including the presentation and content of the narratives. While he did not assign any greater weight to either MPP's or Suwannee's references, Mr. Smith felt that MPP better articulated its understanding of the nature of the work. Mr. Smith was particularly impressed with MPP's understanding of the Department's court-ordered duty to improve access for inmates' to nursing services, which Mr. Smith felt was indicative of MPP's understanding of the contract's service requirements. He was also impressed with MPP's documentation of its 24-hour coverage. In sum, Mr. Smith felt MPP's bid was much clearer than Suwannee's. Cynthia Vathauer Committee member Cynthia Vathauer is a Department accountant, in charge of the inmates' welfare fund, who has previously served as an evaluator of competitive bids. Ms. Vathauer evaluated the respective bids of MPP and Suwannee in a rational and reasoned manner. With respect to Criteria A and B, Ms. Vathauer reviewed the ITB and next performed a detailed analysis of whether the bid components called for by the ITB under Criteria A and B were present in each bid. Her review of the bids under Criteria A and B consisted of listing all of the required components under each criterion and then checking off whether each bidder had adequately provided the required components, making notes where there was partial or questionable compliance and deducting points from the total allowable for each criterion which was missing or incomplete. Whereas Suwannee contends Ms. Vathauer made "no analysis" of the bids under Criteria A and B, simply because Ms. Vathauer stated that she did not read these components of the bids in detail for comparative content, this allegation is not supported by the weight of the competent, substantial evidence. Ms. Vathauer's detailed analysis of the presence or absence of the factors called for by the ITB, supported by her contemporaneous notes, shows that Ms. Vathauer made a rational and reasoned analysis of the bids under those criteria, fully supporting her allocation of points to the bidders under those criteria. She admitted candidly that she was not familiar with the clinical or operational aspects of health service provision. Thus, for example, rather than attempt to compare the relative quality of nurse evaluations (which, incidentally, was not required under the ITB), Ms. Vathauer based her judgment of compliance with this criterion on the presence or absence of valid copies of actual licenses. Dianne Rechtine, M.D. Dianne Rechtine, M.D., is the medical executive director at North Florida Reception Center and acting medical services director for Region II. Dr. Rechtine also performed a rational and reasoned evaluation of the bids under the standards of the ITB. Dr. Rechtine read the respective bids and, with respect to Criteria A and B, assigned points based on her evaluation of those bids. Her notes of how she allocated points under these criteria appear as Joint Exhibit No. 4D and show that Dr. Rechtine actually scored Suwannee higher than MPP under Criterion A and the same as MPP under Criterion B. Suwannee has not been heard to assert that Dr. Rechtine's analysis under these criteria was other than rational and reasoned. Thus, it is found that Dr. Rechtine's analysis and evaluation of the bids was in fact rational and reasoned. Peggy (Richardson) Patray Since Peggy (Richardson) Patray was not called to the witness stand, MPP offered into evidence, without objection, her deposition testimony, taken prior to MPP's intervention and without benefit of cross-examination by MPP or its counsel. Nevertheless, that deposition and Ms. Patray's own evaluation notes appearing as Joint Exhibit No. 4E demonstrate that Ms. Patray, a registered nursing services consultant employed by the Department and previous nursing supervisor at New River Correctional Institute, carefully reviewed the ITB and analyzed and evaluated the bids under Criteria A, B and C prior to awarding points to the bidders. Ms. Patray looked at the types of facilities from which references were obtained and considered, for example, related jail-type experience to be a positive factor. Ms. Patray actually scored Suwannee superior to MPP under Criterion A for reasons related to the bidders' statements of understanding of work. She scored the two bidders evenly under Criterion B, even though she was favorably impressed by one (at the time of her deposition, she could not recall which) bidder's emphasis on pre-employment screening and in-service training, when contrasted with the other bidder's leaving of this responsibility to the individual nurses. Finally, Ms. Patray testified that she was favorably impressed with MPP's sources of references, as opposed to Suwannee's, and that there was not enough information in Suwannee's bid, in her opinion, regarding nurse professional qualifications. In sum, Ms. Patray's testimony and notes in Joint Exhibit No. 4E demonstrate clearly that she also performed a rational and reasoned evaluation of the bids of the parties under the terms and conditions of the ITB. Suwannee's Allegations There is no evidence on the record of this proceeding to support Suwannee's allegations that political or media pressure adverse to Suwannee influenced the decision to award Contract No. R-2119 to MPP. Each Department witness who testified in this proceeding testified that no such political pressure was brought to bear upon them or even attempted. The competent, substantial and unrebutted evidence of record demonstrates clearly that no such pressure or influence occurred or was attempted. In the same vein, Suwannee has alleged that the Committee improperly considered, to Suwannee's prejudice and detriment, factors or information outside of the ITB and the bid documents. The only evidence of record of Committee members having considered information outside of the ITB or the bids was the testimony of several of the Committee members that they either were aware of or considered allegations of past difficulties with MPP, not Suwannee. For example, Mr. Smith testified that he was aware of one past problem with MPP, but none with Suwannee. In any event, he did not consider anything outside of the bid documents in his review. Ms. Vathauer said nothing relating to this issue. Dr. Rechtine testified that she was aware of, and had considered, past problems with MPP, that she had received favorable input as to Suwannee and, to the extent that this knowledge affected her evaluation, she agreed that it did so to the advantage of Suwannee (scored 20 under Criterion A, 20 under Criterion B), and to the disadvantage of MPP (scored 12 under Criterion A, 20 under Criterion B). Finally, even Ms. Patray testified that she had received some negative reports on MPP, whereas she mentioned no such information regarding Suwannee. In sum, there is no evidence of record to support Suwannee's allegations that the Committee members improperly considered, to Suwannee's prejudice and detriment, factors outside the bid documents. Any error which may have occurred in this regard was entirely harmless as to Suwannee, and if it had any effect at all, it worked to Suwannee's benefit. Results of the Bid Evaluation Process The result of the bid evaluation process was that MPP received 88 overall points under the formula set out in the ITB, Suwannee received 85.62, Quality Care received 73.05 and Upjohn received 58.87. MPP was also the low bidder on cost, i.e., Criterion C. The weight and preponderance of the competent, substantial evidence demonstrates that Contract No. R-2119 should have been awarded to MPP, as it was, and that there is an ample, rational, reasoned and logical basis in the record supporting the decision of the Department to award the contract to MPP.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that The Department of Corrections enter a Final Order awarding Contract No. R-2119 to Personnel Pool of North Central Florida, Inc., d/b/a Medical Personnel Pool. DONE and ENTERED this 4th day of December, 1989, in Tallahassee, Florida. DIANE K. KIESLING Hearing Office Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of December, 1989. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 89-4566BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Suwannee Valley Medical personnel Corporation 1 Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1 (page 5). Proposed findings of fact 2-5, 7-12, 14-16, and 18 are subordinate to the facts actually found in this Recommended Order. Proposed findings of fact 6, 17, and 19 are unnecessary or irrelevant. Proposed finding of fact 13 is unsupported by the competent, substantial evidence. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Department of Corrections Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2 (3); 3 (19, 25); 4 (page 5); 6 (11); 7 (12); 8 (16); 9 (46); 14 (44); and 15 (45) Proposed findings of fact 1, 5, and 10-13 are subordinate to the facts actually found in this Recommended Order. Specific Rulings on Proposed Findings of Fact Submitted by Intervenor, Medical Personnel Pool Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 16-50 (1-35) and 53-63 (36- 46) Proposed findings of fact 12-15 are unnecessary or irrelevant. Proposed finding of fact 51 is included on page 5 of the Recommended Order. Proposed finding of fact 52 is subordinate to the facts actually found in this Recommended Older COPIES FURNISHED: John F. Gilroy Attorney at Law Haben & Culpepper 306 North Nonroe Street Tallahassee, Florida 32302 Drucilla E Bell Perri M. King Attorneys at Law Florida Department of Corrections 1311 Winewood Boulevard Tallahassee, Florida 32399-2500 Thomas D. Watry Attorney at Law Parker, Hudson, Rainer & Dobbs 1200 Carnegie Building 133 Carnegie Way Atlanta, Georgia 30303 Richard L. Dugger, Secretary Department of Corrections 1311 Winewood Boulevard Tallahassee, Florida 32399-2500

Florida Laws (2) 120.53120.57
# 2
THE URBAN GROUP vs DEPARTMENT OF TRANSPORTATION, 94-005967BID (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 25, 1994 Number: 94-005967BID Latest Update: Feb. 14, 1995

Findings Of Fact The Department issued an invitation to bid (ITB) and solicited bids for district-wide miscellaneous property management maintenance services pursuant to ITB-DOT-94-95-4004. Kemp Services, Inc. (Kemp), submitted the lowest bid for the subject ITB. Petitioner, Urban Group, Inc., submitted the second lowest bid for the subject ITB. Section 1.1 of the ITB provided: Invitation The State of Florida Department of Transport- ation requests written bids from qualified firms to MAINTAIN RIGHT-OF-WAY STRUCTURES AND VACANT LOTS BY PROVIDING CLEAN-UP SERVICES, LAWN SERVICES, LANDSCAPE SERVICES, SECURING OF BUILDINGS, AND OTHER MISCELLANEOUS HANDYMAN AND SKILLED LABOR SERVICES. ALSO PROVIDE SERVICES FOR SIGN REMOVAL FOR STRUCTURES ILLEGALLY ON THE DEPARTMENT'S RIGHT-OF-WAY OR ILLEGALLY ON PRIVATE PROPERTY IN THE FOLLOWING FIVE COUNTY AREA: BROWARD, MARTIN, PALM BEACH, ST. LUCIE AND INDIAN RIVER COUNTIES. For the purpose of this document, the term "bidder" means the prime Consultant acting for itself and those individuals, partnerships, firms, or corporations comprising the bidder's team by joint venture or subcontract. The term "bid package" means the complete response of the bidder to the Invitation To Bid, including properly completed forms and supporting documentation. [Emphasis in text.] The services were to be provided on an as-needed basis for the term of the agreement, two years. Section 1.7.1 of the ITB provided: Qualifications 1.7.1 Bidders must meet the following minimum qualifications: BIDDERS MUST HAVE AT LEAST TWO YEARS EXPERIENCE PROVIDING AT LEAST TWO (2) OF THE SIX SERVICES OUTLINED IN THE SCOPE OF SERVICES IN EXHIBIT "A". BIDDERS MUST HAVE BEEN IN CONTINUOUS BUSINESS FOR THE PAST TWO (2) YEARS AND COMPLETE FORM "F" WITH THE INFORMATION REQUESTED REGARDING WORK EXPERIENCE AND REFERENCES. ALL REFERENCES WILL BE CHECKED. FAILURE TO PROVIDE FORM "F" AND THE WORK EXPERIENCE REQUESTED WILL CONSTITUTE A NON- RESPONSIVE BID. [Emphasis in text.] Section 1.7.4 of the ITB provided: Qualifications of Key Personnel Those individuals who will be directly involved in the project must have demonstrated experience in the areas delineated in the scope of work. Individuals whose qualifications are presented will be committed to the project for its duration unless otherwise accepted by the Department's Contract Manager. Where State of Florida registration or certification is deemed appropriate, a copy of the registration or certificate should be included in the bid package. Section 1.7.5 of the ITB provided: Authorizations and Licenses The Consultant must be authorized to do business in the State of Florida. Such authorization and/or licenses should be obtained by the bid due date and time, but in any case, will be required prior to award of the contract. For corporate authorization, contact: Florida Department of State Division of Corporations The Capitol Building Tallahassee, Florida 32399 (904)487-6052 Other than the provisions above, no other licensure or authorization to do business was required by the ITB. Section 1.8.2 of the ITB provided: Responsiveness of Bids All bids must be in writing. A responsive bid is an offer to perform the scope of services called for in this Invitation to Bid. Bids found to be non-responsive shall not be considered. Bids may be rejected if found to be irregular or not in conformance with the requirements and instructions herein contained. A bid may be found to be irregular or non-responsive by reasons, including, but not limited to, failure to utilize or complete prescribed forms, conditional bids, incomplete bids, indefinite or ambiguous bids, improper undated or unsealed signatures (where applicable). Section 1.8.4 of the ITB provided: Other Conditions Other conditions which may cause rejection of bids include evidence of collusion among bidders, obvious lack of experience or expertise to perform the required work, or failure to perform or meet financial obligations on previous contracts, or in the event an individual, firm, partnership, or corporation is on the United States Comptroller General's List of Ineligible Contractors for Federally Financed or Assisted Projects. Bids will be rejected if not delivered or received on or before the date and time specified as the due date for submission. Section 1.8.5 of the ITB provided: Waivers The Department may waive minor informalities or irregularities in bids received where such is merely a matter of form and not substance, and the correction or waiver of which is not prejudicial to other bidders. Minor irregular- ities are defined as those that will not have an adverse effect on the Department's interest and will not affect the price of the Bids by giving a bidder an advantage or benefit not enjoyed by other bidders. Section 1.18.1 of the ITB provided: Award of the Contract The Department intends to award a contract to the responsible and responsive bidder who bids the lowest cost as identified in Form "C", Bid Blank, attached hereto and made a part hereof. The ITB did not specify a minimum number of employees, vehicles or hours of service for a bidder to be deemed responsible or responsive. At all times material to this case, Kemp has been in continuous business for the past two (2) years, and completed form "F" with the information requested regarding work experience and references. The Department's agent, Mr. Gentile, checked with two of the references listed by Kemp to verify information relative to this bid requirement. At all times material to this case, Kemp had at least two years experience providing at least two (2) of the six services outlined in the scope of services. The Department's agent, Mr. Gentile, checked with two of the references listed by Kemp to verify information relative to this bid requirement. While Mr. Gentile was authorized to check with all references listed by Kemp, the failure to do so does not discount the information obtained from the sources that were checked. Kemp had an appropriate occupational license to perform work in the tricounty area, but did not have occupational licenses with the City of Hollywood or Broward County. At all times material to this case, Kemp maintained a warehouse to secure the equipment to be used such as lawnmowers, trimmers, and cleaning supplies/equipment. After the bid protest was filed, the Department verified that Kemp had used the warehouse as it claimed. No evidence to the contrary was presented. The mailing address Kemp listed on the first page of its bid response was 8637 S. Sutton Drive, Miramar, Florida. Mr. Faluade resides at that address. He listed that address for mail purposes. The business address for Kemp listed on the bid response was 6200 Johnson Street, Miramar, Florida. This address is a store-front facility with limited office equipment and furniture. Kemp maintains an office at this location but stores its equipment elsewhere as noted above. Kemp was the lowest responsive, responsible bid for ITB-DOT-94-95- 4004.

Recommendation Based on the foregoing, it is, hereby, RECOMMENDED: That the Department of Transportation enter a final order dismissing Petitioner's challenge to the award of ITB-DOT-94-95-4004 to Kemp Services, Inc. DONE AND RECOMMENDED this 14th day of February, 1995, in Tallahassee, Leon County, Florida. JOYOUS D. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of February, 1995. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-5967 Rulings on the proposed findings of fact submitted by the Petitioner: Paragraphs 1 through 4, 6, and 8 are accepted. With regard to paragraphs 5, 7, and 16 noting that the additional emphasis is not in the text and that the citations are incomplete (and perhaps misleading), they are accepted. Paragraph 9 is rejected as contrary to the weight of credible evidence. Paragraph 10 is rejected as contrary to the weight of credible evidence. Paragraph 11 is rejected as incomplete, and therefore, misleading. Corporate documents may have been filed on that date, however, the weight of the credible evidence established that Kemp had been in business the requisite amount of time. Paragraph 12 is rejected as incomplete, and therefore, misleading. The business conducted by the Kemp personnel continued regardless of the business entity structure that was used. Paragraph 13 is rejected as contrary to the weight of credible evidence. Paragraph 14 is rejected as contrary to the weight of credible evidence or irrelevant. Paragraph 15 is rejected as contrary to the weight of credible evidence. Paragraph 16 is rejected as contrary to the weight of credible evidence. Moreover, no credible evidence was presented to establish that Kemp did not provide services as described in the ITB or that it was not in business the requisite time. Paragraph 17 is rejected as incomplete, and therefore, misleading. The mailing address listed by Kemp was a residential address. Paragraph 18 is rejected as irrelevant. Paragraph 19 is rejected as contrary to the weight of credible evidence. Paragraph 20 is rejected as irrelevant. Kemp probably does not have a Leon County occupational license either. It did have an appropriate occupational license at all times material to this case. Rulings on the proposed findings of fact submitted by the Respondent: 1. Paragraphs 1 through 29 are accepted. COPIES FURNISHED: Thomas H. Duffy Assistant General Counsel Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0450 Mitchell B. Polay Mark H. Klein 750 S.E. Third Avenue Suite 205 Fort Lauderdale, Florida 33316 Thornton J. Williams General Counsel Department of Transportation 562 Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Ben G. Watts, Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450

# 3
CORPORATE INTERIORS, INC. vs PINELLAS COUNTY SCHOOL BOARD, 90-002863BID (1990)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida May 10, 1990 Number: 90-002863BID Latest Update: Jul. 06, 1990

The Issue The issue in this case is whether the bid of Kimball International Marketing, Inc., and Corporate Interiors, Inc., (Petitioners) is the lowest responsible bid which was received by the Pinellas County School Board (Respondent) for systems furniture (partitions) for the New District Administration Building, or in the alternative, whether all bids should be rejected as urged by The Harter Group (Intervenor).

Findings Of Fact On or about February 27, 1990, the Respondent sought competitive bids for systems furniture (partitions) for the New District Administration Building. In response thereto, Respondent timely received three bids, including those of the Petitioners and Intervenor, and one no bid. The bid opening occurred on April 17, 1990, and neither Petitioners nor Intervenor were determined to be the lowest responsible bidder. However, the Petitioners' bid was lower than that of the bidder to whom the Respondent proposes to award this contract. Petitioners' bid was $932,502.39, Intervenor's bid was highest at $1,101,509.90, and the bid of lowest responsible bidder, Haworth, Inc., was $1,072,286.50. The first reason given by Respondent for its determination that Petitioners' bid was not responsive to the bid specifications is that it did not include an amount for sales tax. Intervenor also did not include sales tax in its bid, but Haworth, Inc., which was determined by Respondent to be the lowest responsible bidder, did include sales tax. However, there was no dispute at hearing that the Respondent does not pay sales tax on transactions involving the acquisition of furnishings for the Pinellas County School System, and that Section 9.2.2 of the bid specifications erroneously stated that this contract would not be exempt from sales tax. The second reason given by Respondent for rejecting Petitioners' bid was that it omitted a required page from the approved form which was to be used to list those items in the bid proposal that were not in strict compliance with the Respondent's specifications. Petitioners admit that the required page numbered 00310-7 was not included in their bid, but maintain that it was not necessary to include this exact page since all items in their bid do meet specifications, and since a statement to this effect was included elsewhere in the bid. The lowest responsible bidder, as determined by the Respondent, did include this required page with a statement thereon that "all items comply". Intervenor also included this page listing 11 items in its bid which differed from the specifications. The purpose of this required page is to allow the Respondent to have a uniform, clearly identifiable place in each bid proposal where it can look to determine if the items in that bid meet specifications, without having to check every page of each bid. The third reason given by Respondent for rejecting Petitioners' bid was that it included numerous pages of unit costs which were not called for in the specifications, without any explanation as to their meaning or the purpose for which they were included in the bid. Section 4.1.1 of the bid specifications, found at page 00100-11, makes it clear that no bid form other than that which is set forth in the specifications will be accepted, and specifically states that bidders are not even to retype the form on their letterhead, but are to simply fill-in a copy made from the form in the specifications. The Petitioners admit that their bid includes additional, unexplained information that was not called for in the specifications. A final reason given by Respondent at hearing for rejecting Petitioners' bid was that it was accompanied by a bid bond, required by Section 4.2.4 of the specifications, in the name of Kimball International Marketing, Inc., while the public entity crime affidavit, required by Section 2.1.5, was subscribed to by Corporate Interiors, Inc. Petitioners' bid did not include a resolution or other evidence of authority that Corporate Interiors, Inc., had authority to submit a public entity crime affidavit on behalf of Kimball International Marketing, Inc., or that the affidavit submitted was valid as to Kimball. Thus, while Petitioners maintain that their bid was jointly filed on behalf of the manufacturer, Kimball, and the vendor, Corporate Interiors, their bid includes a bond from the manufacturer only, and a crime affidavit from the vendor only. Section 1.8 of the specifications, found at page 00100-2, specifies that the bidder is the person or entity that submits a bid. Petitioners urge that theirs is a joint bid, but they have failed to submit a joint bond or affidavit. Section 5.2.1 of the specifications allows the Respondent to reject any bid which fails to include a required security, or other required data. The bid which was determined by the Respondent to be the lowest responsible bid contains no technical flaws, errors or omissions, and the proposal meets all specifications for this project. The Respondent properly posted notice of its intent to award this contract to Haworth, Inc., the lowest responsible bidder. Under Section 5.3.1 of its bid instructions, the Respondent has the right to waive "any informality or irregularity in any Bid or Bids received and to accept the Bid or Bids which, in (its) judgment, is in (its) own best interest." Respondent chose not to waive any of the irregularities in the Petitioners' bid. This decision was made, in part, because of Respondent's previous experience with Petitioners in their installation of similar systems for Respondent at the Walter Pownall Service Centers in which there had been problems involving service during installation, coordination of the installation work, and verification that invoices received from Corporate Interiors did not exceed the bid base price, and that all items being paid had actually been received.

Recommendation Based on the foregoing, it is recommended that the Respondent enter a Final Order dismissing Petitioners' and Intervenor's protests of its intent to award a contract for systems furniture (partitions) for the New District Administration Building to Haworth, Inc., as the lowest responsible bidder. DONE AND ENTERED this 6th day of July, 1990, in Tallahassee, Leon County, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of July, 1990. APPENDIX TO RECOMMENDED ORDER, CASE NO. 90-2863BID Petitioner and Intervenor filed letters, but no proposed findings of fact upon which rulings could be made. Rulings on Respondent's Proposed Findings of Fact: Adopted in Finding 1. Adopted in Finding 3. 3. Adopted in Findings 4-6. 4. Adopted in Finding 6. 5. Adopted in Findings 4-6. 6. Adopted in Finding 6. 7. Adopted in Findings 6, 8. 8. Adopted in Finding 1. 9. Adopted in Findings 2, 3. 10-12. Adopted in Finding 6. 13. Adopted in Finding 4. 14. Adopted in Finding 3. 15. Adopted in Finding 5. 16-17. Adopted in Finding 7. 18. Adopted in Finding 1. 19. Adopted in Finding 8. COPIES FURNISHED: Allen D. Zimmerman, President Corporate Interiors, Inc. 1090 Kapp Drive Clearwater, FL 34625 Bruce P. Taylor, Esquire P. O. Box 4688 Clearwater, FL 34618-4688 Sue Olinger 1284 West Fairbanks Avenue Winter Park, FL 32789 Dr. Scott N. Rose Superintendent P. O. Box 4688 Clearwater, FL 34618

Florida Laws (2) 120.53120.57
# 4
ADLEE DEVELOPERS, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 92-002798BID (1992)
Division of Administrative Hearings, Florida Filed:Miami, Florida May 06, 1992 Number: 92-002798BID Latest Update: Jul. 31, 1992

The Issue The issue for consideration in this matter is whether Respondent's intended award of a lease for office space to Intervenor, Anthony Abraham Enterprise, is arbitrary and capricious and whether the proposal of the Petitioner, Adlee Developers, the current lessor, is responsive.

Findings Of Fact The parties agreed that on April 7, 1991, the Department issued an Invitation to Bid entitled, "Invitation To Bid For Existing Facilities State Of Florida Lease Number 590:2286, Dade County" This procurement was for the provision of 30,086 net rentable square feet to be used for office space in Dade County. A 3% variance was permitted. The facility was to house the District's Aging and Adult Services office which has been a tenant in Petitioner's building for several years and remained there during the pendancy of this protest process. According to the published advertisement, a pre-proposal conference was to be held on April 22, 1991, with all bids due by the bid opening to be held at 10:00 AM on May 30, 1991. The pre-bid conference was conducted by Philip A. Davis, then the District's facilities service manager and included not only a written agenda but also a review of the evaluation process by which each responsive bid would be examined. Petitioner asserts that the potential bidders were told, at that conference, that annual rental increases for the ten year lease period could not exceed five per cent (5%) and claims that Abraham's bid exceeded those guidelines. Thorough examination of the documentary evidence presented and the transcript of the proceedings, including a search for the reference thereto in Petitioner's counsel's Proposed Findings of Fact, fails to reveal any support for that assertion as to an increase limitation. The ITB for this procurement, in the section related to the evaluation of bids, indicated that pursuant to the provisions of Sections 5-3 and 5-11 of HRSM 70-1, dealing with the procurement of leased space, the responsive bids would be reviewed by an evaluation committee which would visit each proposed facility and apply the evaluation criteria to it in order to determine the lowest and best bidder. The evaluation criteria award factors listed in the ITB defined a successful bid as that one determined to be the lowest and best. That listing of evaluation criteria outlined among its categories associated fiscal costs, location, and facility. As to the first, the committee was to look at rental rates for both the basic term of the lease and the optional renewal period. The rates were to be evaluated using present value methodology applying the present value discount rate of 8.08% and rates proposed were to be within projected budgeting restraints of the Department. The total weight for the rental rate category was to be no more than 40 points with 35 points being the maximum for the basic term and 5 points for the option. Evaluation of the location was to be based on the effect of environmental factors including the physical characteristics of the building and the area surrounding it on the efficient and economical conduct of the operations planned therefor. This included the proximity of the facility to a preferred area such as a co-location, a courthouse, or main traffic areas. This item carried a maximum weight of 10 points. Also included in location were the frequency and availability of public transportation, (5 points); the proximity of the facility to the clients to be served, (5 points); the aesthetics of not only the building but the surrounding neighborhood, (10 points); and security issues, (10 points). The third major factor for evaluation was the facility itself and here the committee was to examine the susceptibility of the offered space to efficient layout and good utilization, (15 points), and the susceptibility of the building, parking area and property as a whole to possible future expansion, (5 points). In that regard, the Bid Submittal Form attached to the ITB called for the successful bidder whose property did not have appropriate zoning at the time of award to promptly seek zoning appropriate to the use classification of the property so that it might be used for the purposes contemplated by the department within 30 days. In the event that could not be done, the award could be rescinded by the department without liability. The committee could award up to 100 points. The basic philosophy of this procurement was found in paragraph 1 of the Bid Award section of the ITB which provided: The department agrees to enter into a lease agreement based on submission and acceptance of the bid in the best interest of the department and the state. After the bid opening, three of the four bids received, excluding Petitioner's which was initially determined to be non-responsive, were evaluated by the Department's bid evaluation committee according to the above point system which allowed no discretion or deviation from the formula in comparing rental rates between bidders. Once Petitioner's bid was thereafter determined to be responsive, it, too was evaluated by the committee. At this second evaluation session, relating to Adlee's bid only, the committee scored the bid and added its scores to the original score sheets upon which the other three bidders' scores had been placed. Abraham had the lowest rental rates for the basic term of the lease and received the maximum award of 35 points for that category while Adlee received points. Abraham received an additional 2.29 points for the optional period rates while Adlee got 0. In the other categories, "location" and "facility", which comprised 60% of the points, Adlee's facility was routinely rated superior to Abraham's except for the area related to susceptibility for future expansion in which Abraham was rated higher by a small amount. Overall, however, Adlee was awarded 620.41 points and Abraham 571.03 points and as a result, Adlee was rated by the committee to be the lowest and best bidder. RCL, another bidder, was rated second, with Abraham third and DCIC fourth. Thereafter, the committee chairman, Mr. VanWerne, forwarded the new (and complete) evaluation results to the District Administrator on June 14, 1991 by an addendum dated June 27, 1991 which recommended award of the bid to Petitioner, Adlee Developers. No award was made at the time. Several factors not pertinent to the issues here caused that delay. Among the major of these was pending legislation which would have transferred the operation needing this space to another agency. This transfer was never consummated, however. On or before March 20, 1992, the new District Administrator, Mr. Towey, who had been appointed to his office in December, 1991, and who was made aware that this procurement had not been finalized, requested all available material on it so that he could study it and make his decision based on his own review of the submission. As a part of his determination process, he visited and inspected both the Adlee and the Abraham sites. One of the factors he considered was what appeared to be the significant monetary discrepancy between the two pertinent bids. Initial calculations indicated that Abraham's bid was approximately $835,000.00 lower than Adlee's over the ten year basic term of the lease. This amount was subsequently determined to be somewhat lower but the discrepancy is still significant. Nonetheless, because of that difference, Mr. Towey called a meeting with the members of the evaluation committee which had evaluated the bidders and had recommended Adlee. His stated reason for calling that meeting was to allow him to hear their reasons for rating the submissions as they had done and to take that information into consideration when he made his final decision. None of the committee members who testified at the hearing at Petitioner's behest indicated any feelings of pressure or intimidation by Mr. Towey. During his meeting with the committee members, Mr. Towey went over several of the evaluation criteria award factors to determine the committee's rationale. Of major importance was the issue of cost, of the availability of the facility to transportation to and from the building, employee security and the ability to control access to the facility, and the availability of on-site parking without cost to both employees and clients. It appears the Adlee facility is a multistory building with some parking available on site and would be easier to control. In addition, it is closer to public transportation access points. There is, however, some indication that on-site parking for clients would not be free and the closest free parking is some distance away. According to Adlee's representative, this matter would not be a problem, however, as adequate, free on site parking, which apparently was not initially identified as a problem, could be provided in any new lease. The Abraham facility is a one story building surrounded by on-site parking. In that regard, however, at hearing, Petitioner raised the claim that the Abraham site did not, in actuality, provide adequate parking because the zoning requirements of the City of South Miami, the municipality in which the facility is located, did not permit the required number of parking spaces to accommodate the prospective need. Petitioner sought and received permission to depose the Building and Zoning Director for the city, Sonia Lama, who ultimately indicated that the Abraham site was grandfathered in under the old zoning rule and, thereby, had adequate parking available. In any case, had this not been true, under the terms of the ITB, any zoning deficiencies could have been corrected after award, or the award rescinded without penalty to the Department. After the meeting with the committee, Mr. Towey indicated he would probably go against the committee's recommendation. One of his reasons for doing so, as he indicated to them, was the appearance certain amenities in the facility would give. In the period between the time the committee met and Mr. Towey was ready to decide, there were several newspaper articles published in the Miami area which were negative in their approach to Department leasing policies and this publicity had an effect on him. In his response to a reporter's question, in fact, Mr. Towey indicated he would not permit the lease of any property which contained such amenities while he was District Director. There is some evidence that the wet bar referred to here was a sink and counter used by agency employees to make coffee. However, before making his decision, Mr. Towey also met with Herbert Adler of Adlee. Mr. Towey advised him he was concerned about the fact that the Adlee property provided a wet bar, a private bathroom and some other amenities in that suite of offices occupied by the Department. Mr. Towey was adamant in his public and private pronouncements on the subject that there would be no such amenities in HRS offices in his District while he was in charge. At the meeting in issue, Mr. Adler made it very clear he was willing to remove all the offending amenities to bring the space into conformity with Mr. Towey's standards. Mr. Towey obviously took Adler at his word as he did not consider this matter to be an issue when he evaluated the bids. Based on his independent evaluation of the proposals, and considering all the pertinent factors, Mr. Towey decided not to concur with the committee's recommendation and instead recommended to the Department's Office of General Services that the bid be awarded to Abraham. Because his recommendation differed from that of the evaluation committee, under the provisions of Section 5-13, HRS Manual 70-1, he was required to forward additional justification for his position. In his forwarding memorandum dated March 20, 1992 to Mr. King Davis of the Department's Office of General Services, Mr. Towey listed as his reasons for disagreement with the committee's recommendation, (1) the lower term cost of Abraham's bid, (2) his opinion that the one story floor plan of Abraham was more convenient and accessible to clients, and (3) the provision for ample free parking at the Abraham site as opposed to the limited parking at the Adlee building. Petitioner claims that Mr. Towey's justification for disagreement was improper because, (a) the rental difference he cited was not based on the ITB formula and did not consider the difference in square footage offered; (b) the rental rate comparison compared a proposed lease with an existing lease, not with a proposal; and (c) the reference to on-site parking referred to the situation under the existing lease with Adlee and not to what could occur under a new lease. The major factor in Mr. Towey's decision was the price differential between the two offerings. While the difference may not have been as great as presented initially by the department staff, even taken in its most conservative light of about half that amount, and considering the appropriate figures, the difference was still considerable and significant. In the continuing period of budgetary austerity under which state operations have been and must continue to be conducted, the financial consideration loomed large in his thinking. As for the parking situation, no change for the better was provided for in Adlee's proposal and even if it were, it was but one of several factors. When Mr. Towey's March 20, 1992 memorandum in justification of his disagreement was evaluated at the Office of General services, it was determined that his decision was rational and objectively justified. Thereafter, by letter dated April 2, 1992, the Office of General Services authorized District 11 to award the lease to Abraham and this decision was transmitted to all responsive bidders by letter dated April 7, 1992. It was this action which prompted Petitioner's protest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered dismissing the protest by Adlee Developers, Inc., of the award of procurement No. 590:2286 to Anthony Abraham Enterprises. RECOMMENDED this 10th day of July, 1992, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of July, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-2798 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: - 4. Accepted and incorporated herein. Accepted. Accepted that the pre-bid conference was held but reject the finding that a 5% limit was mentioned. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. & 11. Accepted and incorporated herein. 12. - 14. Accepted and incorporated herein. 15. - 19. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. Accepted except for the next to last sentence which is rejected. Accepted. Accepted and incorporated herein. Accepted but not probative of any material issue. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. & 30. Rejected. - 33. Accepted and incorporated herein. FOR THE RESPONDENT AND INTERVENOR: & 2. Accepted and incorporated herein. 3. - 5. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. - 16. Accepted and incorporated herein. 17. - 19. Accepted and incorporated herein. 20. & 21. Accepted and incorporated herein. Accepted and incorporated herein. - 25. Accepted. COPIES FURNISHED: Melinda S. Gentile, Esquire Ruden, Barnett, McClosky, Smith, Schuster & Russell 200 East Broward Blvd. P.O. Box 1900 Fort Lauderdale, Florida 33302 Paul J. Martin, Esquire Department of Legal Affairs The Capitol - Suite 1501 Tallahassee, Florida 32399-1050 Peter W. Homer, Esquire Greer, Homer & Bonner, P.A. 3400 International Place 100 S.E. 2nd Street Miami, Florida 33131 John Slye General Counsel Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 Sam Power Agency Clerk DHRS 1323 Winewood Blvd. Tallahassee, Florida 32399-0700

Florida Laws (3) 120.53120.57571.03
# 5
ECCELSTON PROPERTIES, LTD. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-004901BID (1988)
Division of Administrative Hearings, Florida Number: 88-004901BID Latest Update: Jan. 12, 1989

Findings Of Fact Prior to June, 1988, HRS determined that it needed 23,871 square feet of office space to house some of its social services for indigents in Northern Escambia County. Since HRS desired more than 2,000 square feet of office space, it was required to bid lease number 590:1987 competitively. To that end, Respondent prepared an Invitation to Bid and a bid submittal package. The package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Specific areas of importance to Respondent in the selection of its office space were: client safety public access, ingress and egress availability of public transportation. The above areas were important to HRS since the agency would render indigent services to approximately 1000 people a month, many of whom are handicapped or lack good mobility due to age or infirmity. The majority of Respondent's clients are served within a 10 day period during each month. A great deal of pressure is placed on the surrounding area due to the in flux of people. Additionally, many of Respondent's clients utilize public transportation since they do not own or have access to personal vehicles. Because of servicing so many people the above factors received a great deal of weight under HRS's consideration of the property it desired to lease and occupy. All of the above areas were covered by Respondent's weighted bid evaluation criteria. Additionally, in order to submit a responsive bid, a prospective lessor was required to meet one of the following qualifications at the time the bid was submitted: (a) be the owner of record of the facility and parking areas; (b) be the lessee of the space being proposed and present with the bid a copy of the lease with documentation of authorization to sublease the facility and parking areas; (c) submit documentation of an option to purchase the facility and/or parking areas; or (d) submit documentation of an option to lease the facility with authorization to, in turn, sublease. The District Administrator of HRS, Chelene Schembera, is ultimately responsible for bidding, selection and leasing of all HRS facilities within District I, including Escambia County, Florida. In order to accomplish this task Ms. Schembera appointed a bid evaluation committee to review and grade the responsive bids under the criteria established in the bid package, and to recommend to her the committee's choice of the lowest and best bid. Ms. Schembera's purpose in establishing the bid evaluation committee was to secure input from a cross section of people who had a variety of backgrounds and knowledge that would be material in evaluating the office space, in light of the uses for which it was intended and the relative public worth of the work space. Ms. Schembera appointed individuals who were familiar with the type of work to be done in the proposed space, as well as persons familiar with the bid process. On July 21, 1988, HRS received five bids on the lease. Intervenors submitted the apparent low bid which Northside consisted of one building located at the Brentwood Shopping Center in Pensacola, Florida. At the time that the Intervenors submitted their bid, they included documentation which showed that they had a contract to purchase the subject facility; they have since closed on that transaction. This bid package did not include the four acres adjacent to the Brentwood Shopping Center property and no contract to purchase or other documentation was submitted as to the four acre parcel of property. Petitioner submitted the apparent second lowest bid which consisted of one building located at Fairfield Plaza in Pensacola, Florida. Petitioner's interest in Fairfield Plaza is that of a lessee under a Master Lease with rights to sublet the property. All appropriate documentation was submitted with the bid. This property was the subject of a semi-friendly foreclosure action at the time that the Petitioner's bid was submitted. Petitioner was still in possession and control of the property. Both Petitioner's and Intervenors' property were within the mandatory geographical area designated in the bid package. Both bids were responsive under the minimum bid specifications and bidder qualifications. The other three bids which were submitted by HRS are not in contention The committee members personally inspected the sites offered by the Petitioner and the Intervenors. While at the Intervenors' site, the committee's concern over the property's minimal parking (as compared to Fairfield) and limited safe public access, ingress and egress were raised. The only access to Intervenor's property was from a very busy multi-lane highway. Certain turns onto and off the property were extremely dangerous. In order to make its bid package more acceptable, Intervenors' representative orally amended the bid package to include the southerly four acres contiguous to the Brentwood property. The Inclusion of the southerly four acres would adequately increase Intervenors' parking. The amendment would also create additional and safer public ingress and egress since the four acres abutted on Murray Lane which intersects Highway 29. This amendment substantially worked to Intervenors' advantage and was a material change to the previously submitted bid. The improper amendment cannot be considered here. Following the on-site inspections, the committee members met and rated the properties submitted by Petitioner and Intervenors according to a Bid Synopsis evaluation sheet which they had been previously provided. The committee members' review of the Intervenors' property included the improper bid amendment. Even with the improper amendment, the unanimous recommendation of the evaluation committee was to award the lease to the Petitioner and Fairfield Plaza. The evaluation committee based its decision on the scores attributed to each property on the Bid Synopsis sheet by the individual committee members. The committee utilized all the weighted bid criteria. However, two factors were of primary importance. One was its determination that the property offered by the Intervenors presented greater problems for ingress and egress due to the congested nature the area. The other consideration was that service to Fairfield Plaza from public transportation was both more frequent and direct. The property offered by the Intervenors had less public transportation service. The stops were less frequent and a significant number of clients would be required to transfer buses to reach Brentwood when utilizing such public transportation. All bus passengers would be required to walk from the bus stop close to Brentwood and attempt at their peril to cross a very busy, dangerous and congested highway. The reasons given by the individual committee members for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. Each individual member gave a rational and reasonable basis for the scoring he or she used on the Bid synopsis score sheets. The scoring was done by each member after discussion of the two buildings and without influence from the other committee members. In essence, the committee felt that Petitioner's property was the better property for the money. Importantly, every committee member came to the conclusion that Petitioner's property was the lowest and best bid. There is no statutory or rule requirement that one scoring method be preferred over another. The only requirement is that the method be rational and reasonable especially where highly subjective, but legitimate criteria are involved in the selection of a piece of property. On these facts, the individual scoring methods used by the individual committee members were not arbitrary and capricious, but were very rational and reasonably related to the relative importance the committee members gave the above factors. The District Administrator initially adopted the committee's recommendation and reported that recommendation to King Davis, the Director of General Services for HRS. The Director of General Services later informed the District Administrator that he and his staff were concerned with the fact that the recommendation was to award the lease to the second lowest bidder. The staff's review considered the improper amendment as part of the Intervenors' bid. Over a ten year period the Petitioner's rental cost was $62,381.00 more than the Intervenors'. In addition, the estimated energy consumption for the first year for the Petitioner's property was approximately $4800 more than for Intervenors. King Davis and his staff did not believe that the justifications cited in the recommendation letter would be considered crucial enough to override awarding the lease to the lowest bidder, should the agency get involved in a bid protest over the award. He and his staff did not disagree that the reasons assigned by the committee and Ms. Schembera were legitimate considerations. Their ultimate concern was that the reasons given by the committee and Ms. Schembera would not be given as great a weight by a Division of Administrative Hearings' hearing officer; and therefore, fail to withstand a potential bid challenge. But the conclusion that the lack of ingress and egress and public transportation could not outweigh the cost differences assumed that Intervenors' bid included the four acres. Without the four acres, the problems with ingress and egress, congestion and public transportation become even more important and can outweigh minor price differences in rent and energy. This is especially true when one considers the impact that the influx of at least 1000 people would have on an already congested and unsafe area. Put simply, the conclusion that the above factors can and do outweigh price and cost considerations in these facts is not an arbitrary and capricious decision, even though others may disagree with that decision. Instead of reconvening the committee after receiving the recommendation from King Davis and discussing the same with him, the District Administrator made the determination that the lease should be awarded to the Intervenors. The District Administrator, acquiesced in Mr. Davis' assessment that HRS could not succeed in a bid challenge. She did not like his advice. In fact, even at the hearing Ms. Schembera still believed Petitioner's property was the lowest and best for HRS purposes. However, through circular reasoning she also concluded that Intervenors' property was the lowest and best bid because she chose it. The agency's ability to succeed in a bid challenge which may or may not happen is not covered by any of the weighted bid evaluation criteria contained in the bid package and is not an appropriate reason to prefer one bid over another. The foregoing is particularly true when the reason given (surviving a bid protest) is based on the occurrence of a future event which may not occur. To reject a bid for a reason outside the bid criteria and one based on an unknowable future event is an arbitrary and capricious act on the part of Respondent. A court-appointed receiver was ordered to take control of the property belonging to the Petitioner on September 28, 1988, after the bid award was announced. Petitioner still retains its right of redemption of the property, and such an interest is sufficient to confer standing on Petitioner to maintain this action. Moreover, the evidence was clear that Petitioner had both the ability and wherewithal to perform the lease should it receive the bid award. Perfected ownership or control is not required. With Petitioner's apparent ability to perform, the fact of the foreclosure action and the receiver should not work against the Petitioner in this bid protest.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That the Department of Health and Rehabilitative Services enter a final order awarding lease number 590:1987 to Eccelston Properties, Ltd., as the lowest and best bidder. DONE and ORDERED this 10th day of January, 1989, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of January, 1989.

Florida Laws (7) 120.53120.5720.19255.249255.25255.254255.255
# 6
FRED D. BOOZER vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-002712BID (1989)
Division of Administrative Hearings, Florida Number: 89-002712BID Latest Update: Jul. 21, 1989

The Issue Whether Respondent was justified in cancelling the award of bid of HRS Lease No. 590:2054 to Petitioner, BOOZER, on the basis that it was nonresponsive. Whether Respondent acted fraudulently, arbitrarily, illegally or dishonestly in issuing an award of HRS Lease No. 590:2054 to Intervenor rather than to Petitioners or some other bidder.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: HRS caused an invitation to bid to be advertised regarding Lease No. 590:2054 on January 3, 1989 and January 10, 1989. The Invitation to Bid required that all bids be received on or before 2:30 p.m. February 1, 1989, for 9,168 net rentable square feet, plus or minus 3%, of existing office space. A pre- bid meeting was scheduled for January 11, 1989. The advertisement also advise that the bid specifications could be obtained from the Orlando Regional Office of HRS, and that the State of Florida reserved the right to reject any and all bids. The material provisions of the bid specifications at issue in this proceeding are: The space be made available on September 1, 1989 or within 175 days after bid is finalized. The proposed space must be in an "existing building", which was: defined to mean "dry and capable of being physically measured to determine net rentable square footage at the time of bid submittal". The bidder provide 2 clear photographs of the exterior front of the proposed facility and 2 scaled (1/8 inch or 1/4 inch 1 foot preferred) floor plan showing present configurations with measurements that equate to the net rentable square footage (HRS Exh. 1, General Specifications Requirement No. 10(a)) Emphasis in original). Building(s) in not more than 2 locations provided the facilities are immediately adjacent to or within 100 yards of each other. Prior to the pre-bid conference, but after the initial publication of the bid invitation, representatives of NOTTUS contacted Ernie Wilson, the facilities services manager for District 7, HRS, to inquire regarding the propriety of submitting a bid for space in two buildings in which HRS presently had facilities, together with a facility that was greater than 100 yards from the existing facilities. At the time of the inquiry, NOTTUS was leasing facilities to HRS at its Lipscomb facility in Palm Bay, Florida. A portion of the square footage that NOTTUS inquired about leasing to HRS was the remaining square footage in two buildings that HRS partially occupied at that time. All of the premises submitted by NOTTUS under its bid package were located in the Woodlake PUD, which is all under single ownership. A representative from HRS advised the representative from NOTTUS that: the issue regarding the proximity of the locations would not be addressed as a bid specification, but rather, that would be a matter to be weighed by the evaluation committee in analyzing the bids. the bid proposal to be submitted would actually be for two locations as a portion of the space offered by NOTTUS was to be located in buildings in which HRS presently maintained facilities. The submittal of the bid package regarding the premises subject to occupancy by HRS, as ultimately submitted by NOTTUS, would definitely not disqualify the bid submittal. Mr. Wilson also received telephone calls from BOOZER and a third bidder making inquires regarding the bid package. The Pre-bid conference was held on January 11, 1989. No objections or questions regarding the bid specifications as to be utilization or definition of the terms "existing building" and "present configuration" were raised at that time. At no time prior to the submission of the bids were any objections or questions raised by BOOZER regarding the utilization of the term "existing building" or the term "present configuration" as those terms were defined within the bid specification. Each of the Petitioners in this action, the Intervenor, as well as two other parties, submitted bids to HRS within the time requirement set forth in the bid documents. The bids were opened at the time and place reflected in the aid documents and Invitation to Bid. Subsequent to the opening of the bids, John Stewart, who is Ernie Wilson's supervisor, and Ernie Wilson reviewed the bid packages submitted for Lease No. 590:2054 and made a determination as to which bids were responsive. As a result of that evaluation, a determination was made that all five bidders were responsive. These bidders were the Petitioner, Fred D. BOOZER, the Intervenor, Nottus, Inc. the Petitioner, Trust NB-1 Micah G. Savell and Professional Center V. Inc. These bid proposals were then submitted to the evaluation committee who viewed the property of each of the bidders on February 13, 1989. The bid documents of BOOZER contained an additional document, i.e., a site plan, which reflected that the premises subject to his bid proposal were an "existing building". The area submitted for the bid was shaded reflecting the entire square footage submitted for bid as being "in existence." The drawing further reflected the "existing building" as being the "proposed HRS building". The premises subject to the Petitioner's, BOOZER, bid were not in existence, as that term was defined in the bid specifications, in that approximately 2500 square feet had not yet been constructed. Two walls, a floor slab and a roof were not in existence. The only improvements located therein were palm trees, grass and a sidewalk. Petitioner stipulated that the area occupied by the palm trees, grass and sidewalk was in fact "not dry". The existing building at 2225 South Babcock Street that was dry at the time of the bid opening constituted approximately 6,900 square feet of premises subject to Petitioner's bid. At the time of the inspection, the Petitioner, BOOZER, was present. At no time did BOOZER indicate that the total facility bid was not in existence. The members of the evaluating committee who viewed the property for purposes of evaluating the bid were not aware of the fact that the entire premises subject to BOOZER's bid proposal was not in "Existence" and "dry". The floor plan showing the present configuration of BOOZER's facility reflected an open floor space for the area occupied by the palm trees, grass and sidewalk. The palm trees, grass and sidewalk were not reflected in the present configuration drawing. Both the floor plan and site plan were prepared by BOOZER's son with his approval. In evaluating the respective bid proposals, the evaluation committee rated the properties as follows: Fred D. BOOZER - 450 points Nottus, Inc.- 433 points Micah Savell - 384 points Trust NB-l - 360 points Professional Center V. Inc.- 357 points The location requirement found in Article D.3(b) of the bid package was taken into account. In evaluating the Nottus bid, including a zero rating from one of the evaluation committee members. As a result of the points awarded by the evaluation committee, a determination was made to award the bid to BOOZER, who was notified of this award on or about March 14, 1989 by letter dated March 14, 1989. On or about March 20, 1989, Petitioner, BOOZER, obtained a construction permit from the City of Melbourne to construct a fire wall and framing for additional shell building. This building permit was for the purpose of enclosing the area that was occupied by the palm trees, grass and sidewalk at the time of the bid proposal being submitted. Upon being awarded the bid, Petitioner, BOOZER then made a decision to commence construction to complete the premises subject to his bid proposal, and had expended $28,000 thereon through the hearing date. On or about March 29, 1989, HRS, through Ernie Wilson and Lynn Nobley, discovered the fact that approximately 2,500 square feet represented as being a part of the existing building, in fact was not existing pursuant to the bid specifications. At the time of this discovery, construction under the construction permit had not been completed. Mr. Wilson advised BOOZER at that time that he was concerned that BOOZER's bid was nonresponsive because the premises subject to the bid proposal were not in an "existing" building at the time of the bid submittal. The normal procedure for HRS in awarding a bid where the initial award is cancelled or thrown out is to award the bid to the second and next best lowest bidder. It is not the normal practice of the HRS evaluation committee to measure the applicable properties at time of evaluation to determine net rentable square footage. At the time of discovery of the foregoing status of BOOZER's building, Ernie Wilson, contacted a Nottus representative, Fred E Sutton, its President, to advise him of the possible nonresponsiveness of BOOZER's bid and requested information to determine whether Nottus, the second low bidder, still had facilities available pursuant to its bid documents and whether Nottus would agree to continue to continue to be bound by the terms thereof. Mr. Sutton advised Ernie Wilson that the facilities were still available and that Nottus would agree to abide by the terms of its bid proposal. Following the procedural steps necessary to advise the appropriate individuals within HRS of the possible nonresponsive bid by BOOZER, Ernie Wilson was advised by the Director of HRS General Services, King W. Davis, by letter dated April 2, 1989 to withdraw the award for the proposed lease 590:2054 from BOOZER because of approximately 2,500 feet of nonexisting space. He was also instructed to award same to Nottus as the second lowest bidder. On or about April 14, 1989, Ernie Wilson advised BOOZER of the Notice of Withdrawal of the award from BOOZER and award to Nottus, together with the reasons therefor, which was received by BOOZER on April 17, 1989. Petitioner, BOOZER, timely initiated these actions by filing his Notice of Intent to appeal the withdrawal of the award of bid to him and the award to Nottus, and by timely filing a formal written protest and request for formal hearing. Attachment "D" of the bid package required the submittal of a proposed plan to a division of the State Fire Marshal for review of any proposed construction or renovation to determine whether such construction or renovation complied with the uniform fire safety standards. Said plans were required to be prepared by licensed architects and engineers for certifications outlined in Attachment "D". These matters were all to be completed prior to the commencement of any revocation or alteration. Petitioner, BOOZER, commenced said improvements prior to said approval. In fact, BOOZER submitted no plans in compliance with these requirements prior to construction. Petitioner, BOOZER, is a licensed builder in the State of Florida, and has been for ten years. BOOZER further acknowledged that at the time of signing and submitting the bid proposal, he certified that he understood the terms of the bid specifications and agreed to be bound by them. TRUST NB-1 attempted to initiate an appeal of the award of the bid to Nottus by submitting a facsimile "notice of protest" to HRS predicated on the award of the bid to Nottus occurring greater than sixty (60) days following the bid opening date. TRUST NB-1 received notice of the award to Nottus on April 18, 1989 and attempted facsimile delivery on April 21, 1989. The facsimile "Written Notice of Protest" was not filed until April 25, 1989. The regular mail receipt of said Notice was received by HRS and filed on April 24, 1989. 38. The "formal written protest" was filed with HRS on May 1, 1989. 39. signature The facsimile Notice of Intent to Protest did not contain of a representative of TRUST NB-1. the original 40. Ernie Wilson is the custodian of records for bid protests for HRS, District 7, and is also the person designated in the bid documents as the contact person for the bid on Lease No. 590:2054. TRUST NB-1 was ranked number four in relation to the five bids submitted. Bidder Micah Savell, not a party to these proceedings, is the next low bidder after BOOZER and Nottus, Inc.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent enter a final order: (a) Finding the bid of Petitioner, BOOZER, to be unresponsive and that the cancellation of the award by Respondent was justified. Find the bid of Intervenor, NOTTUS to be unresponsive. Find that Petitioner, TRUST NB-1, lacks standing and its protest should be dismissed. Reject all bids. DONE AND ENTERED this 21st day of July, 1989, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of July, 1989. APPENDIX Proposed Findings of Fact by Petitioner, Fred O. Boozer: 1-5 Rejected. 6 and 7 Accepted as incorporated in the Recommended Order. Proposed Findings of Fact by Intervenor, Nottus, Inc. Accepted. Accepted as modified. 3-30. Accepted. 31. The first two sentences rejected as argument and not supported by the evidence. Last sentence in paragraph accepted. 32-40. Accepted. COPIES FURNISHED: Thomas Houck, Esquire 312 South Harbor City Boulevard Suite 1 Melbourne, Florida James A. Sawyer, Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Suite 911 Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (2) 120.53255.25
# 7
WESTON INSTRUMENTS, INC. vs. HARRIS CORPORATION, HATHAWAY INSTRUMENTS, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 75-002110BID (1975)
Division of Administrative Hearings, Florida Number: 75-002110BID Latest Update: Oct. 05, 1977

Findings Of Fact In August, 1975, the Department of General Services invited competitive bids for the purchase of supervisory and control equipment and revenue metering equipment for expansion of primary electric utilities in the Capitol Center, a project known as State Project No. DGS-6026/6424, AEP File No. 74288-003. Plans and specifications for the project were developed by the department's consulting architect/engineers Reynolds, Smith and Hills. The Department of General Services (hereinafter Department) and Reynolds, Smith and Hills (hereinafter Reynolds) conducted formal bid opening on September 25, 1975. Bid proposals were received from petitioner, Weston Instruments, Inc. (hereinafter Weston), and from Respondents, Harris Corporation (hereinafter Harris) and Hathaway Instruments, Inc. (hereinafter Hathaway). The amount of the bids were as follows: CONTRACTOR BASE BID ALTERNATE NO. 1-ADD TOTAL Harris 332,000.00 28,649.00 360,649.00 Weston 338,991.00 20,965.00 359,996.00 Hathaway 343,429.00 33,224.00 376,653.00 Hathaway's bid as submitted was responsive to the specifications and other requirements of the bid invitation. Weston's bid was responsive to the specifications and requirements of the bid invitation with the following exception. Specification B-2, in its second paragraph, states: "In order to facilitate the execution of the Agreement, the Bidder shall submit with his proposal a list of and brief description of similar work satisfactorily completed, with location, date of contracts, together with names and addresses of Owners." Weston did not submit that information with its bid but did submit that information on October 9, 1975. The Harris bid as submitted was not responsive to the specifications and requirements of the bid invitation. The material deviations from the specifications found in the Harris bid are as follows: Paragraph 16755-13(c) of the specifications states that data logger equipment by Teletype, Lear Siegler or General Electric will be considered. The Harris bid proposed a data logger manufactured by Practical Automation, Inc. and noted that if Harris was required to conform to the specifications by furnishing a data logger manufactured by one of the three specified manufacturers, its base bid would have to be increased by $635.00. Paragraph 16755-18 of the specifications requires a specific number of supervisory functions at each of the nineteen locations. The Harris bid met the requirements of the specifications at only one of the nineteen locations. At each of the other eighteen locations the Harris bid was from one to three supervisory points deficient. According to the evidence presented it would cost between $250 to $300 per location to furnish the supervisory points left out of Harris' bid. Paragraph 16755-13(d) of the specifications requires that the data logger shall log an uninitiated (alarm) change of status in red lettering. Harris' bid states that the equipment they have chosen is not available with red ribbon printout and that they therefore propose that all changes normally logged in red would instead have an asterisk in the first column. This specification requiring logging in red of an alarm change of status was included by the specifications writer of the architect/engineers as a safety feature. Paragraph 16755-13(e) of the specifications requires that the log shall contain time in a 24 hour format to a tenth of a minute. The Harris bid proposes that the log shall be in seconds rather than tenths of a minute. The specifications require equipment delivery to the job site and substantial completion within 180 calendar days after receipt of Notice To Proceed. The specifications further provide for liquidated damages of $100 per day for each day the contractor fails to meet the above completion date. The Harris bid requested that the liquidated damages clause and the required time for completion be modified to provice that the 180 day period would not commence until all drawings had been approved by the architect/engineers. The architect/engineers, Reynolds, Smith and Hills, calculated that the required drawing time was approximately 60 days. Therefore, the Harris bid proposes that Harris would have 240 days instead of 180 days in which to deliver the equipment to the site and substantially complete the contract. The Harris bid proposed a deviation from the warranty provision of the specifications. The specifications in paragraph E-17 placed the final determination of the need for repairs or changes under the guarantee clause of the specifications with the architect/engineers and the owner. Harris proposes to alter those specifications and place the right of final determination as to the existence and cause of any claim defect with Harris. Harris' bid contained information setting forth their experience with the Micro II System, which is the system they proposed in their bid. That information shows that the Micro II System had been in use no more than two and one-half years at the time of the bid letting. In its evaluation of the bidders' proposals, based upon the data contained in the original bid packages, Reynolds calculated that the deviation from the specifications by Harris gave Harris at least a $10,135 advantage in its bidding (See Petitioner's Exhibit 8). That evaluation did not include a dollar value for the deviation from the specification concerning the warranty. In that evaluation Reynolds noted the failure of Harris to meet the supervisory point requirements. They calculated that this would add $3,900 to Harris' bid based on twelve locations at $300 per location. In fact, Harris failed to meet the requirements at eighteen locations, which at $300 per location, would add $5,400 to Harris' bid. Thus, using the evaluation figures of Reynolds, it appears that Harris' deviations from the specifications gave them at least an $11,635 advantage in the bidding. On October 9, 1975, Reynolds held a conference with each of the three bidders. At that conference Weston provided a list of three names, with addresses of customers for whom Weston had completed work similar to that proposed in its bid. Reynolds did not receive any material information from these references until after October 31, 1975. At least two of the references commented favorably on Weston's performance in letters to Reynolds dated January 13, 1976 and January 20, 1976, respectively. By letter dated October 31, 1975, Reynolds' project manager for this project conveyed the architect/engineers' recommendation for award to the Department. That recommendation was that the contract be awarded to Hathaway Instruments, Inc., for the base bid item only. The recommendation noted that the alternate should be rejected because the bids for the alternate were excessively high. As stated in the letter of recommendation, Reynolds rejected Harris' bid because "there were several major exceptions taken to the specification (sic), the most serious of which was their not being able to meet the delivery schedule." Also, as stated in the letter of recommendation, Weston's bid was apparently rejected because they "could not meet the experience qualifications as specified." Harris, at the time of the bid letting, had five years experience with its Micro I equipment but had only two and one-half years experience with its Micro II equipment. The two lines of equipment constitute two generations of equipment. Neither Harris nor Weston had five years experience with the specific equipment proposed in their bids. Both, however, have had five years experience with the general type system and equipment proposed with Harris being the more experienced of the two. Based upon the evidence presented Weston and Harris are both responsible bidders. In November, 1975, the Department directed Reynolds to contact Harris and determine whether Harris would conform their bid to the specifications. The project manager for Reynolds so contacted Harris and by letter dated November 17, 1975 (Petitioner's Exhibit 4), notified the Department that Harris stated they would deliver the equipment within the time required by the specifications. That letter reiterated Reynolds' recommendation of Hathaway as contained in their letter of October 31, 1975. Reynolds did not retreat from their recommendation of Hathaway and at the final hearing again stated that recommendation. Thereafter, the Department proposed to award the contract to Harris and set the matter for final decision on December 2, 1975. Harris' bid was a responsible offer but was not in full compliance with the bid specifications and conditions. The bids of Weston and Hathaway were responsible offers and were in full compliance with the bid specifications and conditions except as noted in paragraphs 4, 7 and 19 herein. Paragraph B-18 of the Specifications and Contract Documents (Petitioner's Exhibit 1) states that "No bid modification will be accepted after the close of bidding has been announced." Section A of the same document states that bids would be received until 2:00 p.m. EDST, on September 25, 1975. No evidence was presented which would show that the time for receiving bids was extended beyond that set forth above. Therefore, the close of bidding appears to have been at 2:00 p.m., EDST, September 25, 1975. The agreement by Harris to conform their bid to the specifications and conditions constituted a material modification of their bid. This modification occurred in November, 1975, after the close of bidding, and was therefore not allowable under the terms of the Specifications and Contract Documents set forth above. The lowest base bid and alternate bid of those responsible offers received in full compliance with the bid specifications and conditions was that of Weston. No evidence was presented which would show that the Department submitted its complete File on this matter to the Division of Purchasing along with its reasons for recommending a bid other than the low bid meeting specifications, as required by Section 13A-1.02(a), F.A.C.

Florida Laws (2) 287.012287.042
# 9
VAASTU DESIGN ENGG AND CONSTRUCTION SERVICES, INC. vs DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, 13-000414BID (2013)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 28, 2013 Number: 13-000414BID Latest Update: Apr. 17, 2013

The Issue Whether Respondent's intention to award the contract arising out of Invitation to Bid 12/13-44 (the ITB) to Paragon Construction is contrary to Respondent’s governing statutes, Respondent’s rules on policies, or the ITB specifications.

Findings Of Fact Stipulated Facts On November 16, 2012, the Department posted its ITB for demolition and renovation at the Pompano State Farmers Market. The ITB specified that bids were to be submitted to the Respondent at 407 South Calhoun Street, Mayo Building, Room SB-8, Tallahassee, Florida. The bid opening for the ITB was scheduled for 2:00 p.m. on December 21, 2012. Petitioner's response was received by the Department on December 21, 2012, at 11:07 a.m. Three other responses, from Bi-Tech Construction, Inc., JW Anthony Builders, Inc., and Eagle Enterprises, were received by Respondent prior to 2:00 p.m. on December 21, 2012. Five responses, from Paragon Construction, West Construction, State Contracting and Engineering Corporation, Real Concepts, and Anzco, Inc., were delivered by FedEx to the Department's mailroom at 2:02 p.m. on December 21, 2012. Each was tendered to FedEx on December 20, 2012, for delivery to the Department by 8:30 a.m. on December 21, 2012. The five responses were logged in by the Department's employees on December 21, 2012, between 2:03 p.m. and 2:04 p.m. Petitioner's response and the responses of Bi-Tech Construction, Inc., JW Anthony Builders, Inc., and Eagle Enterprises were opened at approximately 2:10 p.m. by Tina Peacock, assistant to the Department's purchasing director, Christie Hutchinson. Ms. Hutchinson advised Petitioner at 2:15 p.m. on December 21, 2012, via e-mail that Petitioner had provided the apparent low bid of $114,500. At 2:30 p.m. on December 21, 2012, the Department's mailroom personnel delivered the five additional responses to the Department's purchasing bureau in room SB-8 and left them unopened on Ms. Peacock's desk. Ms. Peacock had already left for the day. Ms. Hutchinson discovered the responses and opened them at approximately 2:40 p.m. on December 21, 2012. At 2:56 p.m., Ms. Hutchinson advised Petitioner that Petitioner was no longer the apparent low bidder and that the apparent low bidder was Paragon Construction, with a bid of $98,873. The Department was initially advised by FedEx on January 9, 2013, that the delay in delivering the five responses was due to weather delays in FedEx's Tennessee processing center. FedEx later confirmed that the delay was caused by their internal package sorting network and not due to weather conditions. The tabulation sheet showing the Department's intention to award a contract to Paragon Construction was posted on January 7, 2013. Petitioner timely filed its Petition challenging the Department's intended award. Findings of Fact Based on the Evidence of the Record Under “Special Terms, Conditions and Specifications,” the ITB states in the "Purpose" section that the "project budget is estimated to be $120,000.” All mail and express courier deliveries addressed to the Department are delivered to the Department's central mailroom, which is located in a different part of the building from Ms. Hutchinson's office. Mailroom personnel log in the delivered item, then deliver the mail or item to the room specified on the envelope or package. The normal bid opening procedure used by the Department is for bids to be opened by Ms. Peacock in Ms. Hutchinson's office. In this instance, both Ms. Peacock and Ms. Hutchinson were present for the opening of the first four bids that were received before 2:00 p.m. Bid responders are notified in the ITB that they may, but are not required to, attend the bid opening, which is public. At approximately 2:33 p.m. on December 21, 2012, Ms. Hutchinson received an e-mail from one of the bidders, West Construction, inquiring if the Department received their bid package by the deadline. She sent the tabulation sheet to West Construction. Ms. Hutchinson went to Ms. Peacock's desk at approximately 2:40 p.m. to return the file with the tabulation sheet, and discovered the additional envelopes on Ms. Peacock's desk. She went to the mailroom to find out when the packages were received by the Department, then sought advice from the Department's legal counsel. Upon receiving that advice, Ms. Hutchinson proceeded to open the late arrivals. By that time, Ms. Peacock had gone home, so Ms. Hutchinson personally opened them. There is nothing in the record to indicate that anyone else was in the room with Ms. Hutchinson when she opened the late-arriving bid responses. Between the time of delivery of the responses to the Department, and the opening of the same, the five bid responses remained sealed. Ms. Hutchinson testified that prior to the opening of the five late bids, she did not know what comprised the contents of each bid and had no way of knowing whether the late bids were higher or lower than those already opened. Her testimony in this regard was credible and is accepted. Paragraph 16 of the General Instructions to Respondents reads as follows: Minor Irregularities - Right to Reject. The buyer reserves the right to accept or reject any and all bids, or separable portions thereof, and to waive any minor irregularity, technicality, or omission if the Buyer determines that doing so will serve the State's best interests. The Buyer may reject any response not submitted in the manner specified in the manner specified by the solicitation documents. The “Evaluation and Award” section of the ITB also informs the bidders that "[a]s the best interests of the state may require, the right is reserved to reject any and all bids or waive any minor irregularity or technicality in bids received." The ITB contains the following language regarding late bids: LATE BIDS Bids received after the bid opening time and date will be rejected as untimely and will not be opened. A late bid notice will be sent to the bidder upon the posting of award notice with instructions for its return. Unclaimed late bids will be destroyed after 45 days. Offers from vendors listed on the Department's posted award notice are the only offers received timely in accordance with the Department's bid opening time and date. After leaving work shortly after 2:00 p.m. on Friday, December 21, 2012, Ms. Peacock did not return to work until January 2, 2013. She then contacted FedEx to inquire about the reason for the delay in the delivery of the late responses. Initially, she was informed that the delay was due to weather. However, by letters dated January 29, 2013, the Department was informed by FedEx that the delay was caused by their package sorting network. Whether the delay was caused by the weather or the package sorting network is of no consequence. In either event, the lateness of the five bids which arrived at the Department two minutes after the posted bid opening time was due to problems of the courier, and was not caused by the bidders. The January 29, 2013, letters also informed the Department that the late packages, including the one containing the bid from Paragon Construction, were tendered to the courier service for morning delivery on December 21, 2012.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the Department of Agriculture and Consumer Services enter a final order dismissing the bid protest filed by Petitioner. DONE AND ENTERED this 26th day of March, 2013, in Tallahassee, Leon County, Florida. S BARBARA J. STAROS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 26th day of March, 2013.

Florida Laws (7) 119.07120.569120.57255.0518255.0525255.072286.011