FLORIDA WILDLIFE FEDERATION vs. GORDON V. LEGGETT, MOSELEY COLLINS, ET AL., 82-002235 (1982)
Division of Administrative Hearings, Florida Number: 82-002235 Latest Update: Jun. 21, 1991

The Issue Whether the applicants own the property in question? Whether the project would comply with the criteria of the South Florida Water Management District contained in Basis of Review for Surface Water Management Systems, specifically Sections 3.1.3 and 3.2? Whether flood protection would be inadequate or septic tanks unsuitable or whether the public health and safety would be compromised or the ultimate purchasers be deprived of usage of the property due to inundation in violation of Chapter 373, Florida Statutes (1981), or Rule 40E-4.301(1), Florida Administrative Code?

Findings Of Fact Ms. Williamson and Messrs. Leggett and Collins hold in fee simple a triangular 117.24-acre parcel in Okeechobee County as tenants in common under a warranty deed executed in their favor by one W. C. Sherman. They propose to develop the property as a trailer park (complete with airstrip) large enough to accommodate 109 trailers. To this end, soil would be dug up from the center of the property and used to raise the elevation of the surrounding land above the 100-year floodplain. (T. 47) The applicants have a dredging permit from the Department of Environmental Regulation authorizing them to excavate 629,889 cubic yards. They are proposing to dig to a depth of 76 feet below ground. This would create an 18-acre body of water ("Poe's Lake") which would overflow a V-notched weir into a county canal. The county canal would take the water to C- 38, one of the large canals to which the Kissimmee River has been relegated, at a point about 18 miles upstream from Lake Okeechobee. Runoff would wash over residential lots and roadways; the site would be graded to assure drainage into Poe's Lake. The minimum road crest elevation would be 30 feet NGVD ("[a]round twenty-nine feet" T.52), as compared to the control elevation for surface waters of 28.5 feet NGVD. WATER QUALITY The developers plan septic tanks for wastewater treatment. At the close of all the evidence, counsel for the applicants stated that sanitary sewers could be installed instead. Respondents' Proposed Recommended Order, p. With all the housing units in use, at least 10,900 gallons of effluent would seep into the ground from the tanks daily. There would be some evapotranspiration, but all the chemicals dissolved in the effluent would eventually end up in the groundwater. During the dry season, septic tank effluent would cause mounding of the groundwater and some groundwater movement toward, and eventual seepage into, Poe's Lake. The eventual result would be eutrophication and the growth of algae or macrophytes on the surface of Poe's Lake. This would cause dissolved oxygen violations in Poe's Lake. Discharges from the lake would inevitably occur, aggravating the situation in C-38, which already experiences dissolved oxygen levels below 5.0 milligrams per liter in the rainy summer months. Some fraction of the nutrients in the effluent from the septic tanks would ultimately reach Lake Okeechobee itself. The sheer depth of the excavation would create another water quality problem. Under the anaerobic conditions that would obtain at the bottom of Poe's Lake, bacteria acting on naturally occurring sulfates would produce hydrogen sulfide, ammonia and various other reduced organic nitrogen compounds. These substances are toxic to human beings and would, in some indeterminate quantity, enter the groundwater from Poe's Lake. This would affect the taste and perhaps the potability of water from any well nearby. It would be "possible to design a better system where there would be nutrient removal and a greatly reduced probability of violation of the dissolved oxygen criterion and obviation of the potential for ground water contamination." (T. 200) Installation of a baffle on the weir would serve to prevent buoyant debris from entering surface waters of the state. BASIS OF REVIEW Official recognition was taken of the "Basis of Review for Surface Water Management Permit Applications Within the South Florid Water Management District," parts of which all parties agree pertain in the present proceedings. Among the criteria stated in this document are: 3.1.3 Waste and Wastewater Service - Potable water and wastewater facilities must be identified. The Applicant for a Surface Water Management Permit must provide information on how these services are to be provided. If wastewater disposal is accomplished on-site, additional information will normally be requested regarding separation of waste and storm systems. 3.2.1.4 Flood protection - Building floors shall be above the 100 year flood elevations, as determined from the most appropriate information, including Federal Flood Insurance Rate Maps. Both tidal flooding and the 100 year, 3 day storm event shall be considered in determining elevations. b. Commercial and industrial projects to be subdivided for sale are required to have installed by the permittee, as a minimum, the required water quality system for one inch of runoff detention or one half inch of runoff retention from the total developed site. State standards - Projects shall be designed so that discharges will meet State water quality standards, as set forth in Chapter 17-3, Retention/detention criteria - Retention and/or detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided for one of the three following criteria or equivalent combinations thereof . . . Wet detention volume shall be provided for the first inch of runoff from the developed project, or the total runoff from a 3-year, 1-hour rainfall event, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. Retention volume shall be provided equal to 50 percent of the above amounts computed for wet detention. 3.2.4.1 Discharge structures should include gratings for safety and maintenance purposes. The use of trash collection screens is desirable. Discharge structures shall include a "baffle" system to encourage discharge from the center of the water column rather than the top or bottom. 3.2.4.4.2 b. Control elevations should be no higher than 2 feet below the minimum road centerline elevation in the area served by the control device in order to protect the road subgrade. Simply detaining runoff before discharging it offsite will not insure that the water quality standards set forth in Chapter 17-3 will be met. Whether the standards are met depends on, among other things, the composition of the runoff. FWF'S INTEREST Among the purposes of the FWF, as stated in its charter, Shall be to further advance the cause of conservation in environmental protection, to perpetuate and conserve fish and wildlife, oil, water, clean air, other resources of the State and so manage the use of all natural resources, that this generation and posterity will receive the maximum benefit from the same. (T. 248-9) Four or five thousand Floridians belong to FWF. FWF members "make use" (T. 250) of the waters of Lake Okeechobee, the Kissimmee River and specifically of the waters in C-38. PROPOSED FINDINGS CONSIDERED The applicants and FWF filed post hearing memoranda and proposed recommended orders including proposed findings of fact which have been considered in preparation of the foregoing findings of fact. They have been adopted, in substance, for the most part. To the extent they have been rejected, they have been deemed unsupported by the weight of the evidence, immaterial, cumulative or subordinate.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That SFWMD deny the pending application for surface water management permit. DONE and ENTERED this 29th day of November, 1983, in Tallahassee, Florida. ROBERT T. BENTON II, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of November, 1983. COPIES FURNISHED: Dennis J. Powers, Esquire Gunster, Yoakley, Criser & Stewart 400 South County Road Palm Beach 33480 Terrell K. Arline, Esquire 325-C Clematis Street West Palm Beach, Florida 33401 Irene Kennedy Quincey, Esquire 3301 Gun Club Road West Palm Beach, Florida 33406 Charles P. Houston, Esquire 324 Datura Street, Suite 106 West Palm Beach, Florida 33401

Florida Laws (2) 120.57120.60 Florida Administrative Code (1) 40E-4.301
# 1
FLORIDA KEYS CITIZENS COALITION vs DEPARTMENT OF TRANSPORTATION AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT (940606-10 (MSSW) AND 940606-2-D (WRM)), 95-005525 (1995)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Nov. 17, 1995 Number: 95-005525 Latest Update: Dec. 29, 1997

The Issue Whether FDOT has provided reasonable assurances that the activities it proposes to conduct pursuant to proposed District SWM Permit Application No. 940606-10, WRM Permit Application No. 940606-2-D and modification to ROW Permit No. 2584 will comply with the relevant permit criteria set forth in Chapters 373 and 403, F.S., and applicable rules and criteria promulgated thereunder.

Findings Of Fact THE PARTIES Petitioner, 1000 Friends of Florida (1000 Friends), is a not-for-profit, tax exempt membership corporation, organized and existing under the laws of the State of Florida. The principal office of 1000 Friends is 926 East Park Avenue, Tallahassee, Florida 32314 and it also maintains an office at 3305 College Avenue, Ft. Lauderdale, Florida 33314. Petitioner, Florida Bay Initiative, Inc. (FBII), is an entity incorporated under the laws of Florida with its principal office located at 250 Australian Avenue South, Suite 500, West Palm Beach, Florida 33401. Petitioner, the Florida Keys Fishing Guides Association, is an association of sport fishing guides who live in the Florida Keys and is headquartered at 138 Royal Lane, Islamorada, Florida 33036. Petitioner, Michael Collins, is a private individual. His address is 138 Royal Lane, Islamorada, Florida 33036. Petitioner, Charles W. Causey, is a private individual. His address is Post Office Box 448, Islamorada, Florida 33036. Petitioner, the Florida Keys Concerned Citizens Coalition (FKCC), is a not-for-profit Florida corporation whose address is West Shore Drive, Big Pine Key, Florida 33043. Petitioner, AG Intus, Inc., filed a Notice of Voluntary Dismissal on August 9, 1996. DOAH Case 95-5524, the proceeding filed by Intus, was previously consolidated with the other cases to this proceeding. On August 12, 1996, the Intus case was severed from this proceeding and the Intus hearing cancelled. Respondent, the South Florida Water Management District (the District or SFWMD), is a public corporation in the State of Florida existing by virtue of Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 373, F.S., and Title 40E, F.A.C., as a multi-purpose water management district, with its principle office in West Palm Beach, Florida. Respondent, the Florida Department of Transportation (FDOT), is an agency of the State of Florida. Its District Six address is 1000 N.W. 111th Avenue, Miami, Florida 33172. Intervenor, Monroe County, is a political subdivision of the State of Florida. For the purposes of this proceeding the address for Monroe County is c/o Apgar and Pelham, 909 East Park Avenue, Tallahassee, Florida 32301. The District, FDOT and Monroe County did not object to the standing of the Petitioners at the formal hearing and represented that they will not object to the standing in the event of an appeal. Based on the representations of the Respondents, the Petitioners were not required to put on a case as to their standing. THE THREE PERMIT APPLICATIONS FDOT has applied to the District for a Wetland Resource Management (WRM) permit, a Surface Water Management (SWM) permit, and a Right of Way (ROW) occupancy permit. On June 6, 1994, the Applicant submitted applications for surface water management and wetland resource management permits for the purpose of widening and modifying this 20.4 mile stretch of U.S. 1. The surface water management permit application is identified as Application No. 940606-10. The wetland resource management permit application is identified as Application No. 940606-2-D. On October 24, 1995, the District issued Staff Reports on Permit Application No. 960606-10 and Permit Application No. 94060-2-D. These Staff Reports recommended issuance of the permits subject to general and special conditions as specified therein. An addendum to the staff report was issued November 3, 1995. On September 27, 1994, the Applicant submitted a request to modify its existing ROW Occupancy Permit to enable it to replace the bridge where U.S. 1 crosses the C-111 Canal. The land encompassed by the ROW occupancy permit challenged in this proceeding is located in Section 16 and 17, Township 59 South, Range 39 East, Dade County, Florida. A draft right-of-way occupancy permit with standard limiting and special conditions was produced as part of a package that went to the Governing Board and others. The proposed authorization for use of the ROW is for the following: REMOVAL OF EXISTING U.S. HIGHWAY 1 BRIDGE AND REPLACEMENT WITH A NEW FIXED BRIDGE. PROJECT INCLUDES CONSTRUCTION OF A NEW SERVICE/ACCESS ROAD, 2 DETENTION PONDS, 2 CATCH BASINS, 2-15" R.C.P. OUTFALLS, BOAT RAMP WITH LOADING DOCK, PARKING AREA, PEDESTRIAN GATE AT S-197, FENCING AND WILDLIFE CROSSING ALL WITHIN THE NORTH AND SOUTH RIGHT OF WAY OF C-111 (STATION 938+00 - 955+00). The draft right-of-way occupancy permit modification, identified as “SFWMD PERMIT NO. MOD 2548," should correctly be identified at “SFWMD PERMIT NO. MOD 2584.” The numbers “8” and “4” were inadvertently transposed. STIPULATIONS AS TO APPLICABLE LAW The parties have accurately set forth the applicable permitting criteria and the appropriate Basis of Review in their prehearing stipulation. CRITERIA FOR ROW PERMIT Rule 40E-6.301, Florida Administrative Code, provides, in pertinent part, as follows: In determining whether an occupancy permit should be issued, the District shall consider whether the proposed activity: interferes with the present or future construction, alteration, operation or maintenance of the works of the District; is consistent with the policy and objectives of Chapter 373 F.S., the legislative declaration of policy contained in Section 373.016, F.S. and the state water policy, Chapter 17-40, F.A.C.; has an actual or potential negative impact upon environmentally sensitive areas, which include: wetlands; endangered or threatened species habitat; aquatic preserves; outstanding Florida waters; federal, state and privately owned parks and wildlife management areas; designated areas of critical state concern; lands purchased by federal, state and local governments for the purpose of environmental protection, water resource protection and esthetics; and lands which contain native terrestrial plant species in significant amounts. Environmentally sensitive areas include areas on and off- site that are affected by activities which occur on, or are initiated from, the District’s works; degrades water quality within the receiving water body or fails to meet the provisions of Ch. 373, F.S., the state water policy, and Ch. 40E, F.A.C.; involves a discharge of wastewater from a new wastewater source or an increased discharge from an existing wastewater source; will discharge debris or aquatic weeds into District lands or works or cause erosion or shoaling within the works of the District; is supported by financial assurances, which will ensure that the proposed activity will be conducted in accordance with Chapter 373, F.S., and Chapter 40E-6, F.A.C.; presents an increased liability risk to the District; meets the general and specific criteria in the Basis of Review which is incorporated by reference in Rule 40E- 6.091, F.A.C.; interferes with actual or potential public use of the District’s works or public, recreational or other facilities not within the District’s works; is consistent with local zoning and other private land uses in the area; interferes with the quality or quantity of a public or private water supply; meets applicable criteria in Chapters 40E-61 and 40E-62, F.A.C.; ROW occupancy permits typically have standard limiting conditions which are incorporated as part of the permit. The permit may also have special limiting conditions. CRITERIA FOR PERMITTING THE SWM SYSTEM Rule 40E-4.301(1), Florida Administrative Code, contains the following criteria that, at the times pertinent to this proceeding, were used by SFWMD in determining whether to permit a surface water management system: In order to obtain or modify a permit under this chapter, an applicant must give reasonable assurances that the surface water system: provides adequate flood protection and drainage, without causing over- drainage, will not cause adverse water quality and quantity impacts on receiving waters and adjacent lands regulated pursuant to Chapter 373, F.S., will not cause discharges which result in any violations, in surface waters of the state, of the standards and criteria of chapter 17-302, F.A.C., will not cause adverse on-site or off-site impacts on surface and groundwater levels and flows, including impacts to sources of water supply and wetland hydrology, will not cause adverse environmental impacts, can be effectively operated and maintained, will not adversely affect public health and safety, is consistent with the State Water Policy, chapter 17-40, F.A.C., for a DRI with a signed Preliminary Development Agreement with the Florida Department of Community Affairs, pursuant to section 380.06(8), F.S., provides a surface water management system for that portion of the site approval for development which is able to operate separately from the surface water management system for the balance of the project site and still meet applicable District criteria. meets any applicable basin criteria in chapter 40E-41, F.A.C., will not otherwise be harmful to the water resources of the District, will not interfere with the legal rights of others as defined in subsection 17-40.401(8), F.A.C., is not against public policy, will meet general and specific criteria in the document described in subsection 40E-4.091(1)(a), F.A.C., (0) will meet criteria for isolated wetlands, which are found in Appendix 7 of the document described in rule 40E- 4.091(1)(a), F.A.C., (p) will meet the criteria for above ground impoundments, which are found in Appendix 6 of the document described in rule 40E-4.091(1)(a), F.A.C. The SFWMD has adopted certain procedures and criteria contained in a document, referred to as “Basis of Review for Surface Water Management Permit Applications Within The South Florida Water Management District” (BOR). Subsection 40E-4.091(1)(a), F.A.C. incorporates this document by reference into Chapter 40E-4, F.A.C. The BOR is a document that is “described in subsection 40E-4.091(1)(a), F.A.C.,” within the meaning of Rule 40E-4.301(1), F.A.C. The BOR establishes a rebuttable presumption that water quality criteria are met through specified volumetric retention and detention requirements. These performance based criteria are designed to be flexible. CRITERIA FOR THE WRM PERMIT In 1992 DEP entered into an Operating Agreement with the District, which delegated to the District responsibility for issuing wetland resource management (WRM) permits, which are required for dredge and fill activities in wetlands. Both DEP and the District implement the same wetland resource permit and MSSW permit rules. The District agrees with DEP's interpretation and application of the WRM permitting rules and non-rule policy, and applies the same when issuing such permits. Section 403.918, Florida Statutes (1991), provides the pertinent criteria that must be applied by the District in determining whether to grant or deny the WRM permit. That criteria requires the applicant to provide reasonable assurance that water quality standards will not be violated. In addition, for projects in OFW, the applicant must provide reasonable assurance that the project is clearly in the public interest. THE PUBLIC INTEREST TEST The District is required to balance the following criteria, found at Section 403.918(2)(a), Florida Statutes (1991), in determining whether a project is clearly within the public interest: Whether the project will adversely affect the public health, safety, or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s.267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. MITIGATION If the applicant is unable to otherwise meet the public interest test, the District shall, pursuant to Section 403.918(2)(b), Florida Statutes, “consider measures proposed by or acceptable to the applicant to mitigate adverse effects which may be caused by the project . . .” The District thereafter re-evaluates the project to determine whether the project, as mitigated, meets the public interest test. The criteria for mitigation is found in Chapters 373 and 403, Florida Statutes, Title 40 E (including the Basis of Review) and Rule 62-312, Florida Administrative Code. Rule 62-312.330, Florida Administrative Code, states the general criteria for evaluating mitigation proposals as follows: The goal of the mitigation proposal shall be to offset the expected adverse impact of the project that have resulted in the project being deemed unpermittable such that the resulting project with mitigation is not contrary to the public interest or, in the case of Outstanding Florida Waters, is clearly in the public interest. Each project must be separately evaluated to determine whether the proposed mitigation is sufficient. Rule 62-312.340, Florida Administrative Code, provides guidelines that are to be used in evaluating proposed mitigation projects. GENERAL DESCRIPTION OF THE PROJECT AREA FDOT proposes to widen a 20.4 mile portion of U.S. 1 in southern Dade County and northern Monroe County. Approximately seven miles of the project area is in Monroe County and approximately thirteen miles is in Dade County. The northern terminus of the project is the intersection of U.S. 1 and Card Sound Road, which is located in Dade County south of Florida City. The southern terminus of the project is the intersection of U.S. 1 and Abaco Road on Key Largo in Monroe County. The corridor of the proposed project passes through Sections 6, 7, 16, 18, 21, 27, 28, Township 59 South, Range 39 East; Sections 24, 25, 36, Township 58 South, Range 38 East; Sections 16, 19, 30, 31, Township 58 South, Range 39 East, Sections 16, 30, 31, Township 60 South, Range 40 East; Sections 25, 26, Township 60 South, Ranges 39 East, Dade and Monroe Counties, Florida. U.S. 1 is the main highway between northern Monroe County and southern Dade County. The only other road between Monroe County and Dade County is Card Sound Road. The Florida Keys is designated as an Area of Critical State Concern, pursuant to Section 380.0552, Florida Statutes. The Dade County portion of the road, north of the C- 111 canal, lies within typical Everglades habitat, which is classified as environmentally protected lands of Dade County. Most of the project corridor in Dade County is part of or adjacent to the Everglades National Park. Valuable wetlands exist throughout the project corridor. The following bodies of water will receive discharges if the surface water management system is permitted: C-111 Canal, Jewfish Creek, Lake Surprise, Blackwater Sound, Barnes Sound, Little Blackwater Sound, Long Sound, Manatee Bay, Sarge Lake, andManatee Creek. The receiving bodies of water are Outstanding Florida Waters (OFWs) or are connected to OFWs. THE EXISTING ROADWAY As it presently exists in the project area, U.S. 1 is a two lane undivided highway with two passing zones that are each one mile in length. Each travel lane on the existing facility is twelve feet wide. The existing shoulder on either side of the road consists of four feet of pavement and six feet of grassed area. FDOT Exhibit 7 accurately depicts the existing roadway typical section. Exotic vegetation, generally limited to the areas immediately adjacent to the highway, exist throughout the project corridor. These exotic species are present because FDOT has failed to properly maintain its right of way. A clear zone is an unobstructed area that includes the shoulder of the roadway and typically extends beyond the shoulder. The purpose of the clear zone is to provide a driver who has lost control of his or her vehicle a sufficient clear recovery area to regain control of the vehicle so that it can be maneuvered back onto the road. The clear zone for the existing road is inadequate to provide a safe recovery area. There is at present a two lane bridge over Manatee Creek, a two-lane bridge crossing the C-111 Canal, a bascule bridge, which is a drawbridge, over Jewfish Creek, and a two lane causeway through Lake Surprise. The two existing passing zones are located in Dade County. The first is south of U.S. 1’s intersection with the C-111 canal between mile markers 113-115. The second passing lane is approximately four miles south of the northern terminus of the project between mile markers 120-122. Each existing passing zone is undivided and consists of two northbound lanes and two southbound lanes, with each travel lane being twelve feet in width. The shoulders in the passing zones are the same as for the typical section. A surface water management (SWM) system is defined by Rule 40E-4.021(5), Florida Administrative Code , as being "the collection of devices, improvements or natural systems whereby surface waters are controlled, impounded, or obstructed.". There is no surface water management system presently associated with the road. The roadbed is elevated approximately five feet above mean sea level according to the National Geodetic Vertical Datum and was constructed on the old railroad bed of the Florida East Coast Railroad. No hydrologic culverts have been placed within the roadbed. Consequently, surface water flow between the eastern and western sides of the road north of the C-111 Canal has been cut off. C-109 AND C-111 CANALS In the 1960's, the C-109 and C-111 canals were constructed as part of an overall water management system in the area. As a result of the roadbed and the canals, water has been impounded on the western side of U.S. 1 at a level higher than on the eastern side. Due to cutoff of waterflow by the roadbed embankment, historic freshwater flow between the eastern and western sides of the project area has been restricted, which has resulted in an adverse impact on the Everglades ecosystem north of the C-111 Canal. The restricted water flow has resulted in less fresh water being available for shorter periods of time. Consequently, aquatic life has had reduced opportunities to develop. The restricted flow also has impeded the ability of aquatic life to reach freshwater areas during times of drought. On the east side of the road marine conditions have displaced what naturally should be freshwater conditions. PROJECT HISTORY While FDOT has been aware of traffic safety and hurricane evacuations concerns on the roadway for a long time, the current project originated in 1986 when Monroe County identified this project as a need in its 1986 Comprehensive Plan. Pursuant to agency practice, the proposed project was incorporated into FDOT's five year work program and a study was performed pursuant to FDOT’s Project Development and Environment (PD&E) Manual. FDOT's PD&E manual describes the process by which FDOT determines whether to construct or improve a road. The PD&E process includes an Environmental Impact Statement (EIS) to analyze existing conditions, assess the need for improvement, and develop alternatives. A Draft EIS is performed and circulated for comment to governmental agencies and the public. Based upon comments and further review a Final EIS is prepared. Metric Engineering ("Metric") began the PD&E study of the project in 1988 pursuant to a contract with FDOT. Metric identified seven factors which it concluded supported the need for the project. First, the improved corridor would improve the linkage between the four lane road at the northern terminus and the four lane road at the southern terminus. Second, the project would improve navigation by replacing the existing bascule bridge at Jewfish Creek. Third, the project would improve the level of service for the road. Fourth, the project would improve the safety of the road. Fifth, the project would improve the clearance time for hurricane evacuation. Sixth, the project was consistent with the long range transportation plans adopted by Monroe County. Seventh, the project would accommodate increased traffic, which can be expected with or without the project. Based on the needs evaluation, Metric performed a corridor analysis to determine the best way to get from Florida City to Key Largo, including improving only Card Sound Road, improving only U.S. 1, or improving a combination of the two. Metric concluded that the best resolution was to improve the project corridor. Metric also analyzed various alternatives in an effort to reduce the size of the typical section of the roadway in the U.S. 1 corridor and thereby minimize environmental impacts of the project. Because of concerns from Everglades National Park that no aspects of the project construction occur within its boundaries, FDOT agreed to conduct all construction east of FDOT's existing right of way line. The conclusions of the Metric studies were memorialized in a Final EIS and Final Engineering Report published in 1992. Conclusions regarding alternatives and project needs were then incorporated into the permit application and have continued to be updated. The 1992 version of the project was for a four lane roadway with four lane bridges throughout the project corridor. Subsequent to its June 6, 1994, permit applications to the District for a four lane roadway, FDOT went through an extensive process of providing the District with additional information in an effort to provide the District with the necessary reasonable assurance that the proposed project would comply with the permit criteria. The final series of modifications contained the three lane alternative, which will be described in detail below and is now the subject of this proceeding. The three lane proposal is a compromise that FDOT agreed to in an effort to minimize the direct, secondary, and cumulative impacts of the project. Monroe County passed Resolution No. 315-1995 on September 7, 1995, asking FDOT to build a three-lane road on a four-lane embankment. This resolution provided, in part, that “. . . Monroe County finds that the '3-lane alternative' as described in the Statement of Agency Commitments is the most viable proposal of those considered, because it balances the needs for a widened highway with safeguards designed to address secondary impacts.” The secondary impacts referred to in the resolution included concerns that two southbound lanes would result in more growth. The rationale behind the resolution was that more growth would result from two southbound lanes than from one southbound lane with the proposed passing zones. In response to the request of Monroe County and in response to a similar request made by the District, FDOT notified the District by letter dated September 5, 1996 of FDOT's decision to redesign the project to change the roadway from four to three lanes. FDOT HAS MINIMIZED THE IMPACTS OF THE PROJECT During the PD&E process prior to permit application FDOT studied project needs and alternative alignments, and conducted corridor analyses. FDOT originally considered a proposal that included approximately 250 acres of wetlands impacts. At the District's suggestion, FDOT revised its proposal prior to the permit application to reduce the wetland impacts and project footprint. The application submitted contained approximately 165 acres of impact. FDOT changed the typical section of the proposed roadway again after substantial interagency coordination in an effort to reduce wetlands impacts even further. FDOT agreed to reduce the footprint by changing the design of the median from 22 feet and a Jersey barrier (which is a minimum barrier) to 20 feet with a tri-beam rail barrier. The more substantial barrier was added because the median was narrowed. Additionally, instead of ten-foot paved shoulders on each side of the median, FDOT would use two-foot paved shoulders with sixteen feet of grass in the middle. These minimization efforts resulted in a wetland impacts decrease from 164 acres to 149.07 acres, the current impact of the project. Avoidance, or choosing alternate routes to avoid impacts to wetlands, was not a possible option because only wetlands and open waters exist between the northern and southern terminus of the project. FDOT explored all reasonable alternatives to the proposed project, including a two lane alternative proposed by a consultant for FBII. As discussed below, FDOT did not adopt the two-lane alternative, because the alternative did not address all of FDOT's identified needs for the project. FBII prepared a report with a two-lane alternative to the proposed project. FBII's original proposal included one 12-foot northbound lane with a 10-foot paved shoulder covered with thermoplastic rumble strips to deter vehicular use of the shoulder. In the southbound direction, FBII proposed a 12-foot travel lane with a 4-foot paved shoulder, essentially the same as currently exists. That proposal was analyzed by Metric Engineering on behalf of FDOT. FDOT rejected the FBII alternative for several reasons. First, though the 10-foot northbound shoulder theoretically may be used by cars during hurricane evacuation, removal of the rumble strips would be impractical due to lack of time to do so under threat of a hurricane, and due to the costs involved. It would be unrealistic to require people to otherwise drive over the rumble strips, without removal, because they are designed to prevent such access. Using the 10-foot shoulder during an evacuation would result in there being no shoulder area to remove accident vehicles from the roadway which would otherwise threaten to restrict the flow of traffic or cease it altogether. The reduced width of the shoulder lane below the standard 12-foot lane would also decrease the flow of evacuees. FBII's proposal for a two-lane fixed-height bridge at Jewfish Creek would not completely eliminate rear-end collisions at the bridge. The two-lane alternative proposed by FBII is not a signed and sealed cross section. The proposal by FBII does not include the area necessary for a SWM system or for clear zones. FBII did not do an analysis to determine whether its proposal complies with pertinent FDOT roadway and traffic design standards or with pertinent highway safety and improvement standards. The FBII proposal does not account for removal of the Lake Surprise causeway or construction related impacts from barge traffic. FBII did not do a wetlands survey to determine the impact of its two-lane proposal. At the Final Hearing, Petitioners presented for the first time a new proposal to use "flexible diverters" to pave a third northbound lane and to block that lane from travel traffic with poles. However, no research was conducted into the feasibility of such a proposal, nor was it adequately thought out. Such a use of "flexible diverters" is unprecedented in FDOT's history, is impractical to implement, and would violate FDOT's design standards contained in its Manual on Uniform Traffic Control Devices. Petitioners also presented for the first time at the Final Hearing a proposal to add an 8 to 10 foot paved northbound shoulder which could be converted to a travel lane with traffic control cones in the event of an evacuation. This plan is also not feasible, because the resulting lanes would not be wide enough to safely accommodate evacuating traffic, and because the contradiction between existing road striping and the placement of cones would likely cause accidents, which would halt evacuation. The proposals submitted by FBII do not sufficiently improve hurricane evacuation or traffic safety and, consequently, are not acceptable alternatives to the project. FDOT can do nothing else to minimize the impacts of the project and still address the needs for the project. Minimization of wetlands impacts was accomplished to the greatest extent possible. FDOT has proposed mitigation to offset the impacts that could not be avoided. THE PROPOSED PROJECT - IN GENERAL STIPULATION AS TO DESIGN AND CONSTRUCTION Petitioners stipulated that the design and construction specifications of the roadway proposed to be permitted in this case comply with all applicable design and construction standards for structural integrity, and adequately describe the three-lane divided roadway proposed to be constructed on a four-lane roadbed/embankment. PROPOSED LANES, SHOULDERS, AND MEDIAN FDOT proposes to widen the roadway in the project area to a three lane divided roadway with two northbound lanes and one southbound lane, plus three passing zones. The proposed project will be constructed on a four lane roadbed embankment. FDOT does not presently have plans to add the fourth lane to this roadway. FDOT Exhibit 8 contains an accurate description of the proposed typical section of the roadway. The typical section will consist of two twelve-foot northbound lanes with a six-foot paved shoulder and a four foot stabilized area adjacent to the paved shoulder; a twenty-foot median consisting of a two-foot paved shoulder, sixteen feet of grass and a tri-beam guardrail in the middle as a separator; and one twelve-foot southbound lane with an eight-foot paved shoulder. The proposed typical section also includes a storm water management system that will be described in more detail below. The proposed typical section includes a clear zone thirty feet in width, which is adequate. THE THREE PASSING ZONES The existing passing zone located in Dade County between mile markers 113 and 115 is one mile in length. FDOT proposes to alter this passing zone to 1.44 miles in length. The existing passing zone located in Dade County between mile markers 120 and 122 is also one mile in length. FDOT proposes to alter this passing zone to 2 miles in length. In addition, FDOT proposes to construct a 1.5 mile long passing zone between mile markers 110 and 112 in Monroe County. If permitted, the proposed project will include 2 passing zones in Dade County and 1 passing zone in Monroe County, for a total of 3 passing zones. The total length of the passing zones will equal 4.94 miles. ELEVATION There are no plans to change the elevation of the existing roadway. HYDROLOGIC CULVERTS The project contemplates the construction of 25 hydrologic culverts north of the C-111 Canal. These culverts will remain capped until further hydrological studies are completed and input from all concerned regulatory agencies can be obtained. It has not yet been determined how these culverts will be utilized to maximize the improvement to the ecosystem north of the C-111 Canal. WILDLIFE CROSSINGS INCLUDING THE C-111 BRIDGE The project contemplates the construction of three wildlife crossings north of the C-111 Canal in Dade County with fencing designed to funnel wildlife through the crossing. These crossing, sometimes referred to in the record as “panther crossings” are located between mile markers 118-119, 122-123, and 126-127 and will be constructed as overland bridges. In addition, the replacement bridge over the C-111 Canal (located between mile markers 116-117 in Dade County) is intended to serve as a wildlife crossing and will also employ fencing to funnel wildlife through the crossing. All four of these structures will be constructed as four-lane bridges, but will be striped for three lanes with rumble strips on the southbound fourth lane to discourage vehicular traffic in that lane. There will be an eight foot outside shoulder. FDOT proposes to construct 18 culverts south of the C-111 Canal for crossings by crocodiles, alligators, manatees, and other wildlife. These crossings will consist of 15 box culverts and 3 bridges. MANATEE CREEK BRIDGE The proposed bridge at Manatee Creek would be constructed as a four lane bridge, but would be striped for three lanes with rumble strips on the southbound fourth lane to discourage vehicular travel in that lane. There would be an eight foot outside shoulder. BRIDGING JEWFISH CREEK AND LAKE SURPRISE Jewfish Creek, which is part of the Intracoastal Waterway, and Lake Surprise would be bridged by a continuous structure. The Jewfish Creek bascule bridge would be replaced by a high-level four-lane fixed bridge. The Lake Surprise causeway would be replaced by a low-level four-lane bridge. The total distance for this bridging is approximately 2.35 miles. AREA OF PROJECT THAT WILL BE OPERATED WITH FOUR-LANES The three passing lanes (4.94 miles) and the bridge over Jewfish Creek and Lake Surprise (2.35 miles) would be operated with four lanes. Those areas total 7.29 miles of the 20.4 mile project corridor. Approximately 43 percent of the proposed roadway would have four lanes of pavement. Excluding the areas where the fourth lane will be blocked from travel with rumble strips, only 35 percent of the completed project will contain four travel lanes. This area consists of the three passing zones and the bridges over Jewfish Creek and Lake Surprise. THE PROPOSED SWM SYSTEM The proposed project would provide for a SWM system consisting of inlets, culverts, swales, berms and dry/wet retention areas. For the typical roadway section, runoff from the paved roadway surfaces will be directed to roadside swales designed to provide retention for 50 percent of 2.5 inches times the impervious area. The SWM system for the bridges will collect runoff in inlets and culverts and direct it to either swales or dry or wet retention ponds. The berms of the SWM system provide additional protection by restricting spills of pollutants, such as petroleum from overturned tankers or other vehicle accidents, from running into the surrounding waters. The berms and swales of the SWM are designed to catch pollutants and prevent their discharge into the surrounding waters. FDOT Exhibit 18 consists of four separate drainage reports submitted to the District in 1995 in connection with the project, one report for each section of the project. The reports accurately document the drainage calculations, the drainage design, the rationale behind the drainage design, and compliance of the design with the laws and regulations of the permitting agencies for the original four-lane proposal. On or about September 5, 1995, FDOT submitted revised drainage calculations to the District, determining the amount of stormwater treatment for the three-lane project. The revised calculations established that at least 95% percent of all stormwater runoff from the project would be captured in the proposed SWM system. Because the swale design was based on the originally proposed four-lane road, retention will be in excess of the required volume for most sections of the roadway. The required retention volume for this project is approximately 166 percent of what is required by the BOR. The surface and subsurface geology of the roadway consists of Miami oolite limestone overlain with Perrine maral. Underlying this is Thompson formation, anastasia and Key Largo limestone. Based on these constituencies, the swales proposed by the SWM system would be effective in rapidly removing heavy metals and phosphorous. The revised calculations established that approximately five percent of the project area will not have a SWM system. These areas will not have a SWM system because properly-sized retention systems in those areas can not be constructed without causing a disproportionate, adverse impact to surrounding wetlands. FDOT has provided reasonable assurances that the proposed SWM system’s total water quality treatment exceeds the District's permitting requirements and provides sufficient treatment to exceed the BOR requirements. The water discharged from the proposed system would be of higher quality than that currently discharged, which is not treated. FDOT has provided reasonable assurances that the proposed SWM system complies with the permitting criteria found in Rule 40E.301(1)(a)-(p), Florida Administrative Code. The following findings are made as to that criteria. Rule 40E-4.301(1)(a), F.A.C. The parties stipulated that Rule 40E-4.301(1)(a), F.A.C., pertaining to flood protection and the adequacy of drainage, is not at issue in this proceeding. Rule 40E-4.301(1)(b), F.A.C. The quality of water being discharged from the SWM system will be of substantially higher quality than the existing discharges. Consequently, it is concluded that the system will not cause adverse water quality impacts within the meaning of Rule 40E-4.301(1)(b), F.A.C. In addition, the evidence established that there will likely be less water discharged from the roadway if the project is constructed because of the amounts of water that will likely be retained in the swales that are a part of the SWM systems. Rule 40E-4.301(1)(c), F.A.C. Because the receiving bodies of water are designated Outstanding Florida Waters, the District is required to apply the DEP's most stringent water quality requirements -- the antidegredation requirements for discharge to OFWs, to this project. Those standards will be discussed in more detail below. The evidence established that the proposed project will not violate those requirements. Rule 40E-4.301(1)(d), F.A.C. Impacts to sources of water are not at issue. The District reviewed the potential effect of the SWM system upon on-site and off-site impacts to surface or groundwater levels and flows. The evidence supports the District's conclusion that no adverse impacts will be caused. Petitioners failed to present any evidence on groundwater levels and flows. Consequently, it is found that the criteria found at Rule 40E-4.301(1)(d), F.A.C., has been satisfied. The 25 hydrologic culverts north of C-111 have the potential to re-establish historic surface water flow in the area. They were sized, based on rainstorm events, to help equalize water levels from one side of the road to the other. The culverts are capable of transferring water from west to east to assist in the historic restoration of flows. In order to assure the proper usage of the culverts, they will remain gated until the District develops a management plan in conjunction with other agencies. The District will determine the maintenance entity. The FKAA water main runs beneath this section of the road. As a result, there is no other more hydrologically efficient alternative for the placement of the culverts. The culverts would also provide a means for overwash from storm events, over the U.S. 1 roadbed, to flow back to its point of origin, stabilizing the roadbed and allowing release of the accumulated salt water. Rule 40E-4.301(1)(e), F.A.C. In addition to providing for a net improvement in water quality, the project will offset any adverse impacts through mitigation and other environmental enhancements for which no mitigation credits are being assigned, as described below. Rule 40E-4.301(1)(f), F.A.C. FDOT has a history of adequate maintenance of SWM systems, and has provided reasonable assurance that it has the staff and budget to comply with District operation and maintenance requirements. FDOT will also be able to comply with the District's requirements to control exotic plants and other foliage along project corridor. Rule 40E-4.301(1)(g), F.A.C. The SWM system will not adversely affect public health and safety. The dispute as to the public interest test focused more on the WRM permitting requirements. Findings as to the public interest test are discussed in more detail below. Rule 40E-4.301(1)(h), F.A.C. The evidence established that the SFM system is consistent with State Water Policy. Rule 40E-4.301(1)(i), F.A.C. This project does not pertain to a DRI and, consequently, this criteria is not applicable. Rule 40E-4.301(1)(j), F.A.C. There are no basin criteria applicable to this project. Rule 40E-4.301(1)(k), F.A.C. The evidence established that the SWM system will not be harmful to the water resources of the District. While there will be adverse environmental impacts caused by the project, those adverse impacts have, as will be discussed in more detail below, adequately offset by mitigation. Rule 40E-4.301(1)(l), F.A.C. This issue was not at issue in this proceeding. Rule 40E-4.301(1)(m), F.A.C. As will be discussed in greater detail in a subsequent section of this Recommended Order, the project is not against public policy. For the reasons set forth in that subsequent section, it is found that the project is clearly in the public interest. Rule 40E-4.301(1)(n), F.A.C. Rule 40E-4.091(1)(a), F.A.C., constitutes the BOR. As discussed in detail above, the SWM system complies with the BOR. Rule 40E-4.301(1)(o), F.A.C. There are no isolated wetlands pertaining to this project. Rule 40E-4.301(1)(p), F.A.C. There are no above ground impoundments, as described in Appendix 6 of the BOR, pertaining to this project. WATER QUALITY - DISCHARGES INTO OFW Because the project will involve discharges into Outstanding Florida Waters, it was necessary for FDOT to establish that the discharges from the SFW system will not degrade those OFWs. The evidence established that FDOT's proposed project complies with and exceeds applicable water quality standards and permitting criteria. There will be no significant degradation of ambient water quality as a result of the project. It is expected that there will be a net improvement in ambient water quality resulting from the proposed project, as opposed to the continued degradation if nothing is done to treat stormwater runoff. In FDOT Exhibit 46, FDOT provided baseline water quality data in the form of STORET data for waters adjacent to the project area. STORET is a centralized repository and database for water quality data throughout Florida. It is Florida's principal source of water quality data. STORET contains the best scientific database on water quality in Florida. The STORET data set forth in FDOT Exhibit 46 provided sufficient evidence on ambient water quality for the waters adjacent to the proposed project. In addition to providing the water quality data in FDOT Exhibit 46, FDOT is required by Special Permit Condition 37 to submit appropriate water quality data in the surrounding waters prior to any construction activities. SFWMD Exhibits 5 and 6 contain amendments to Proposed Agency Action made after the beginning of the formal hearing. These amendments include a requirement that an appropriate water quality monitoring plan be submitted within 30 days of the permit issuance. FDOT has provided reasonable assurances that water quality standards will be met and that there will be appropriate water quality monitoring during construction. DIRECT IMPACTS OF THE PROJECT The proposed roadway design will result in the following direct impacts to wetlands adjacent to the roadway corridor: 1) the dredging of 11,028 cubic yards of material from 2.1 acres, 2) the placement of 1,689,553 cubic yards over 147.0 acres of wetlands, and 3) 6.9 acres of (potential) permanent impact due to shading and 4.1 acres (potential) of temporary impacts from the Jewfish Creek Bridge construction activities to seagrass habitat. In order to determine the project's direct impacts, the area surrounding the project was surveyed to determine the number of affected acres. This was done by using a computer aided design ("CAD") system, and by categorizing the various forms of wetlands and associated flora and fauna into the following communities: mangrove, emergent freshwater, open water, and tidal, consisting of seagrass and non-vegetated bottoms. Using these categories and the CAD system, every square foot of direct impacts were accounted for. The adverse direct wetland and surface water impacts of this project are as follows: 1) 27.83 acres Non- Vegetated Tidal Bottom; 2) 11.27 acres Seagrasses; 3) 46.85 acres Mangroves; 4) 42.35 acres Sawgrass/Cattail/Spikerush; 5) 14.31 acres Shrub Wetlands; and 6) 6.46 acres Open Fresh Water; totaling 149.07 acres. Though some wetlands to be impacted may be of lesser quality, FDOT stipulated that all wetlands to be directly impacted by the project should be considered to be high quality wetlands for the purpose of mitigating the impacts. The impacted wetlands are part of larger wetland systems. Petitioners assert that the District should have required studies as to impacts as to the larger wetland systems. The evidence established that the District appropriately considered the type and location of the wetlands involved so that additional study suggested by Petitioners was unnecessary. Petitioners also assert that impacts to isolated wetlands should have been studied. The evidence established that there will be no such impacts. SECONDARY AND CUMULATIVE IMPACTS RECOGNIZED BY SFWMD In addition to the direct impacts of the project, the District is required to analyze secondary and cumulative impacts. A project's secondary impacts are those that, though outside of the project footprint, are very closely linked and causally related to the project. This is a "but for" test. Secondary impacts are those impacts which, if not for the proposed project, would not occur. Both positive and negative secondary impacts are considered. When there are both positive and negative secondary impacts caused by a project, the permitting agency must consider the severity of the impacts and balance these together with the other factors in the public interest test to determine whether or not the project is clearly in the public interest. WRM statutes, and DEP rules and policies pertaining to those statutes do not regulate growth or traffic increases, per se. Only if such increases are very closely linked and causally related to the project will they be considered. The District identified several secondary impacts that would be temporary in nature since they would occur while the project is being constructed. One is the use of a barge facility, primarily at Jewfish Creek, where the anchoring of the barge may result in temporary impacts to seagrass during construction. This impact is addressed by a component of the seagrass mitigation at Boca Chica, discussed below. Another impact is turbidity associated with the dredge and fill and the barge activities. That issue is appropriately addressed by permit conditions, through the use of turbidity control screens and other techniques. The District also identified secondary impacts directly associated with the project footprint that would be permanent in nature. The removal of the exotic vegetation potentially opens up the areas adjacent to the road north of the C-111 canal to off-road vehicles or four-wheel driving and the potential impacts caused by those vehicles. That impact is appropriately addressed by fencing north of the C-111 canal. When a road is widened, animals have a greater distance to travel back and forth from one side of the road to the other. A wider road exposes such animals to greater risk of being hit by a motor vehicle while crossing the road. That impact is addressed in this project by the fencing, the wildlife crossings, and the wildlife box culverts. The crossings are designed for large mammals and some species, such as the Indigo snake, will likely not use these crossings. The wildlife crossings will not entirely mimic the crossing patterns of all wildlife that need to cross U.S. 1 and will result in some wildlife habitat fragmentation. The fencing that will be erected to funnel wildlife through the crossings will fragment the habitat of some species by altering wildlife crossing patterns and blocking access of some species to certain areas of habitat. The greater weight of the evidence established that any habitat fragmentation should, when compared to existing conditions, be minimal. The District appropriately evaluated the advantages and disadvantages of using wildlife crossing and hydrological culverts and appropriately concluded that there would be a net benefit to wildlife as a result of their construction. The District properly concluded that the culverts, bridges and fencing located south of the C-111 canal, construction of wildlife crossings and fencing north of the C- 111 canal, construction of the hydrologic culverts, and removal of the Lake Surprise Causeway are positive secondary benefits of the project. These benefits should be considered when applying the public interest test. THE FKAA PIPELINE RELOCATION The project requires the relocation of two segments of the existing pipe owned by the Florida Keys Aqueduct Authority (FKAA) around Jewfish Creek Bridge. The segments total approximately 1.5 miles. The District inspected the area where the pipeline will be relocated to assist in determining its impact. The pipeline relocation is a temporary disturbance during construction. It is a small linear facility, which will not generate pollution in and of itself. The pipeline relocation is not expected to result in a violation of State water quality standards. The FKAA is responsible for obtaining the necessary permits for the relocation. Direct impacts to wetlands will occur in a 4 to 5 foot wide strip along the length of the relocated aqueduct. The FKAA has submitted a permit application to the DEP for a permit to relocate the aqueduct. DEP believes that adequate mitigation can be achieved to make the project permittable. Once the FKAA submits an adequate mitigation plan, then relocation of the aqueduct will not be an adverse secondary impact caused by the U.S. 1 project. The permit for the subject project should contain a condition that the FKAA obtain a permit for the relocation of these two segments of its pipeline. THE C-111 BOAT RAMP There is an existing boat ramp designed for small boats to access District canals that is located on the north side of the C-111 canal. As a result of the proposed project, it will be relocated to the southern side of the project. This relocation is a relatively minor project requiring a cut in the canal bank and a fourteen-foot wide slab for the boat ramp. When the District considered the potential impacts associated with this relocation in conjunction with the impact of the proposed project, it was determined to be a relatively insignificant impact in terms of the project as a whole. Relocation of the boat ramp is not expected to result in a violation of state water quality standards. All direct, cumulative, and secondary impacts, whether positive or negative, should be considered in balancing the public interest test. ARE THERE ADDITIONAL SECONDARY AND CUMULATIVE IMPACTS Petitioners assert that there are additional cumulative and secondary impacts that the District failed to consider. Petitioners argue that the project cannot meet permitting criteria if those additional impacts are considered. The additional impacts pertain to additional development throughout Monroe County because of the “rate of growth ordinance” (ROGO), additional development along the project corridor, impacts to the coral reefs of the Keys, impacts to Key Deer, generalized impacts, and impacts from increased number of “day trippers." For the reasons discussed below, it is found that the District has considered all appropriate direct, secondary, and cumulative impacts of the project. The additional impacts that Petitioners assert should have been considered are not causally connected or directly linked to the project. THE RATE OF GROWTH ORDINANCE Monroe County adopted its Year 2010 Comprehensive Plan (the "Plan") to meet the requirements of Chapter 163, F.S. The Plan, adopted May 15, 1993, is unusual in that the County limits future growth based on a carrying capacity analysis of its hurricane evacuation clearance time. No other jurisdiction in Florida, and few others in the United States, have used a carrying capacity planning approach. To implement the carrying capacity limitation, Monroe County determined the total number of dwelling units that could be permitted while maintaining an acceptable hurricane evacuation clearance time of 24 hours. This number of dwelling units, less an allowance for vested development and development in municipalities, was the basis for a ROGO that was adopted by the County in 1992. The ROGO allocates the available units at a uniform annual rate of growth (currently, 255 units per year). The ROGO regulates all proposed new residential buildings, including hotels, motels, and other transient tourist accommodations as well as permanent residences. The number of building permits that Monroe County can issue is, at present, directly related to how rapidly the County can be evacuated in the event of a hurricane. The lower the clearance time, the greater the number of permits that can be issued. The Comprehensive Plan requires that the County be able to evacuate within a 24-hour period. As of March 7, 1995, the hurricane evacuation time for Monroe County was determined to be 21.25 hours.1 The project is expected to reduce by six or seven hours the modeled hurricane evacuation capacity for Monroe County, regardless of whether it consists of three or four lanes. This is because both the three lane and four lane plans provide for two northbound lanes. Because of the rate of growth provisions in county law, this reduction of clearance times results directly in an increase in the number of building permits that the county can issue annually. Under ROGO, Monroe County can, with this project, issue 255 permits each year through the year 2026. Without this project, Monroe County can issue 255 permits each year only through the year 2001. Alternatively, without this project, the county can issue 88 permits each year through the year 2010 if it chooses to issue permits over a longer period of time. Following extensive litigation before the Division of Administrative Hearings in an unrelated proceeding2, the Administration Commission entered a final order on December 12, 1995, that approved approximately 97 percent of the Plan. In addition, the Administration Commission has published a proposed rule to bring the remainder of the Plan into compliance and assure its financial feasibility. The central feature of the proposed rule is a five- year work program, with annual reviews by the Administration Commission. It is likely that the proposed rule will eventually result in the complete revision of the ROGO. The proposed rule provides that Monroe County's annual rate of growth be revised within five years, no later than December 31, 2001, "to establish a rate of growth and a set of development standards that ensure that any and all new development does not exceed the capacity of the county's environment and marine systems." A carrying capacity study will comprehensively assess water quality, habitat protection, and public facility issues to determine the capacity of the Keys to sustain further development. The proposed project is but one of many factors that will be considered in future rate of growth regulations. If the expected revisions occur, it would be speculative to predict what development would be allowed. While the studies are underway the rate of growth will remain at 255 units per year. The rate of growth will be reviewed annually, and may be reduced a minimum of 20% if the goals of the studies are not being met. The DCA has determined that Monroe County’s Comprehensive Plan and its land development regulations are sufficient to prevent or mitigate any potential adverse secondary impacts of the project caused by development. The DCA has consistently supported the proposed project, even in its earlier four-lane configuration, because it was consistent with Monroe County's 1986 Comprehensive Plan, and because the project would improve hurricane evacuation clearance times and improve water quality in the vicinity of the roadway. The 1986 plan supported widening of the roadway to four lanes based on projected travel demand. The DCA prefers the current, three-lane proposal to the earlier four-lane. On September 7, 1995, the Monroe County Commission adopted Resolution 315-1995 in support of the proposed project because "it balances the needs for a widened highway with safeguards designed to address secondary impacts." Lorenzo Aghemo, an expert in comprehensive planning, served as Monroe County Planning Director during the development of the Plan and ROGO. In Mr. Aghemo's opinion, the widening of the roadway to either three or four lanes would generate minimal growth pressure in Monroe County, particularly because the Plan limits the rate of growth. Because the Keys are designated by Section 380.0552, F.S., as an area of critical state concern, the DCA is charged with oversight of Monroe County's Comprehensive Plan, its LDRs, and all development that takes place in Monroe County. Additionally, the Administration Commission may amend Monroe County's plan or regulations by rule (See Section 380.0552(9), F.S.). There is virtually no action that Monroe County can take related to the use of land without review and approval of a state agency. The Administration Commission’s proposed rule demonstrates its intent to revise comprehensively Monroe County's ROGO within five years to ensure that future development does not exceed the capacity of the Keys' environmental resources. It also demonstrates the Administration Commission's intention to closely monitor growth and development in the Keys during the five-year study period. Some of the studies required by the proposed rule are already underway: 1) the DCA has entered into a contract with the ACOE to complete the environmental carrying capacity study; 2) the HRS study of advanced on-site waste water treatment systems is underway; 3) Monroe County is developing the required Marathon central sewer facilities plan; and 4) Monroe County and HRS have begun the cesspit identification and elimination process. Caution should be exercised in relying on this or on any other proposed rule. Likewise, caution should be exercised in relying on changes to ROGO that may or may not occur. It is likely that the present status of the law will be changed in the near future so that future development will be based on environmental carrying capacity as opposed to hurricane evacuation clearance times. However, for the purposes of this proceeding the District should accept the fact that the issuance of future building permits is closely linked and causally related to the project. Consequently, it is found that under the present status of the law, the issuance of additional building permits in Monroe County is closely linked or causally related to the project. MONROE COUNTY LDRS AND DCA OVERSIGHT Although Petitioners established that there is a causal relation between the project and the existing status of the law governing the number of building permits that can issued in the future, the evidence was insufficient to establish at a level above speculation that adverse environmental impacts will result because of the issuance of those building permits. The Monroe County Comprehensive Plan contains land development regulations that govern all development in Monroe County. These regulations are among the most stringent in the State and are designed to avoid or minimize adverse environmental impacts caused by development. All development orders in Monroe County are closely scrutinized by the Department of Community Affairs to ensure compliance with applicable permitting criteria. Those regulations and the DCA’s close scrutiny are intervening factors that break any causal relation between the project and the speculative adverse environmental impacts that the Petitioners assert will be caused by future issuance of building permits by Monroe County. Petitioners failed to establish that the impacts of future development are very closely linked or causally related to the project. Consequently, it is found that such impacts are not secondary or cumulative impacts of the project. DEVELOPMENT ALONG THE PROJECT CORRIDOR A major portion of the area next to the road has little or no development potential because it is either water, land in public ownership, or land slated for public ownership. The areas east of the road are mostly in private ownership, but are primarily submerged lands and mangrove areas. The Crocodile Lakes National Wildlife Refuge is federally owned and is managed by the U.S. Fish and Wildlife Service (USFWS). The Southern Glades lands, located immediately west of the project and Everglades National Park (ENP) in Dade County, have been acquired by the District and are managed by the Florida Game and Freshwater fish Commission (FGFWFC). The Model Lands Basin in Dade County is in private ownership but proposed for public acquisition in the future. The land adjoining the roadway in Dade County is designated as open area or environmentally sensitive. Almost half of the land along Monroe County's portion of the roadway is in public ownership. At least 90% of the land in private ownership is mangroves or wetlands that cannot be developed. The small area of uplands is currently being used by a resort marina which will not be allowed to develop further under the new comprehensive plan. There is very little potential for future development in the project area. The comprehensive plan designation for areas in Dade County are open space, and the ones in Monroe County have the conservation designation. The District's regulatory programs consider areas adjacent to the project as sensitive wetland habitats. Based on the District's regulatory authority and comprehensive plan designation for those lands, which would have to be obtained prior to obtaining a permit for development, it is very unlikely that those lands could be developed. Florida Rock and Sand Co. (FRS) has a permit to mine approximately 1,100 acres of wetlands. As part of its mitigation program, FRS will donate this land to the District once its mining and mitigation projects are complete. The FRS mitigation lands are preserved as a permit condition and will ultimately be transferred to the District. This land will not be developed. In addition, the District established that the U.S. 1 project and the FRS project do not constitute a cumulative impact that the District failed to consider. The evidence established that development along the project corridor will not be a secondary or cumulative impact of the project. IMPACTS ON CORAL REEF SYSTEM The evidence was insufficient to establish a close link or causal connection between the project and the coral reef system. As reflected elsewhere, it is found that there will be no degradation of ambient water quality as a result of the project. Therefore, there is no need to resolve the conflicting testimony as to the present status of the coral reef system. IMPACT ON KEY DEER There are no key deer in the project area. The nearest key deer habitat, Big Pine Key, is approximately 70 miles from the southern terminus of the project. The evidence is insufficient to establish that there is a very closely linked and causally related connection between the project and key deer mortality on Big Pine Key. GENERALIZED IMPACTS The Petitioners presented certain opinion testimony that the Keys cannot be developed in an environmentally sensitive manner because of potential adverse impacts of new development in Monroe County, or new boats operating in the waters of the Florida Keys. The credibility of that testimony need not be evaluated because the evidence was not sufficient to tie those generalized concerns into the specific regulatory criteria of the permitting agency. There was insufficient evidence to establish that those alleged impacts would be very closely linked or causally related to the proposed project. DAY TRIPPERS Induced demand is new travel that occurs solely because additional capacity is added to a highway. Petitioners' transportation experts, Michael Replogle and Robert Morris, testified that FDOT's traffic studies, and FDOT's projected rate of traffic growth of approximately 3 percent annually, are incorrect because the studies do not predict the amount of "induced demand" that would result from the proposed project. Petitioners assert that induced demand would generate an unknown number of people who drive to the Keys for the day from south Dade County, referred to as “day trippers,” will have an impact on the Keys that has not been evaluated. The assertion that this potential impact has not been analyzed is rejected as being contrary to the greater weight of the evidence. Induced demand is accounted for in Monroe County's Long Range Transportation Plan, which was never evaluated by Mr. Replogle or Mr. Morris. The Long Range Transportation Plan was prepared by an experienced traffic engineering consulting firm, Barton-Aschman, using an FDOT- approved traffic demand model, the FSUTMS model, that includes all traffic generators and attractors, and all travel on U.S. 1 on weekdays and weekends. The FSUTMS model does not restrict demand based on the existing road capacity. The model uses an "unrestrained assignment" that incorporates the total predicted trip generation on recreational facilities, hotels, and all other attractors. The Long Range Traffic Plan was used to develop the Monroe County Comprehensive Plan, which takes into consideration the projected increases in traffic and makes appropriate provisions for those increases. FDOT has provided reasonable assurances that it has properly projected the amount of traffic for the project corridor after the project is completed and that the projected increases have been appropriately addressed by Monroe County's Comprehensive Plan. MITIGATION - IN GENERAL For the reasons discussed above, it is found that there are no secondary or cumulative impacts that the District failed to consider. Petitioners also contend that the mitigation proposal is insufficient to offset the direct and secondary impacts recognized by the District. This is a large dredge and fill project that will permanently fill 149 acres of wetlands. The wetlands that will be adversely impacted by the project include OFWs that provide a great variety of functions and serve as habitat for fish and wildlife, including threatened and endangered species. The wetlands are unique and of high quality. Mitigation for direct, secondary and cumulative impacts was considered as part of the permit evaluation. In- kind mitigation is considered to be most effective, but out- of-kind mitigation may be offered by the applicant where it is impractical to conduct in-kind mitigation due to historic changes in the project area or sensitivity of the habitat type for which mitigation is offered. Such mitigation is also appropriate to address regional alteration of an ecosystem, such as the Everglades ecosystem alteration caused by the original roadway embankment. FDOT developed a conceptual mitigation plan that took into account project impacts on the freshwater, marine and estuarine components of the ecosystems involved, as well as the impacts on threatened and endangered species of wildlife which may be affected by the project. FDOT coordinated the plan's development with the National Parks Service, U.S. Fish and Wildlife Service, the Army Corps of Engineers, the National Marine Fisheries Service, the U.S. Environmental Protection Agency, the Dade County Department of Environmental Resources Management, the Florida Game and Fresh Water Fish Commission, and the Florida Department of Environmental Protection. The conceptual mitigation plan evolved as a result of project modifications and agency comments into what is now proposed as mitigation for the project. The current proposal is summarized in FDOT Exhibit 26, consisting of Attachment H to FDOT's SWM and WRM permit applications. The timing of their construction falls into two general categories: mitigation previously permitted and concurrent mitigation. UPFRONT MITIGATION Typically, mitigation is done concurrently with project construction rather than prior to permit issuance. Mitigation is often done afterwards because of construction timing constraints. Here, FDOT applied for and, in May 1994 received, permits to conduct mitigation prior to applying for the permits at issue, with the understanding that performance of these activities does not require the District to issue permits for the proposed projects. A total of 385.22 acres of mitigation has already been completed. The applicant received 203.02 mitigation credits from the District on May 12, 1994, for several mitigation projects that the applicant proposes to apply to the proposed U.S. 1 widening project provided it is approved. Table 2 of Attachment H to FDOT Exhibit 26 sets forth the four mitigation projects that constitutes the up- front portion of the mitigation for the project. This table sets forth the acres mitigated, the conversion factor for the mitigation, and the resulting mitigation credit awarded. The four mitigation activities already authorized are: enhancement of the wetland habitat in the Harrison Tract located adjacent to Barnes Sound within the Crocodile Lakes National Wildlife Refuge on the north end of Key Largo (70.37 acres credit for 252.6 acres of restoration); removal of the spoil mounds on the eastern bank of the C-111 canal east of U.S. 1 located on the District’s ROW (10.65 acres credit); the back filling of the C-109 canal levee located on the District ROW within the Southern Glades Save Our River project (112.7 acres credit); and the removal of the roadside spoil mounds on the west side of U.S. 1 located between C-111 and the Dade Work Camp Road within the District’s Southern Glades Save Our Rivers Project (9.30 acres credit). The mitigation projects pertaining to the roadside spoil removal along U.S. 1, the backfill of the C-109 Canal, and the removal of spoil along the C-111 Canal are similar projects because they each involve existing deep ditches cut through wetlands. When these deep ditches were cut, the spoil material from the ditch was deposited alongside the ditch. This resulted in areas that were previously Everglades wetlands becoming spoil, supporting the growth of exotic species and, for the most part, not exhibiting wetland functions. FDOT is proceeding with the backfilling the C-109 canal located between mile markers 122.5 and 117, and removal of the corresponding spoil mounds created during construction of the C-109 canal. In connection with this mitigation, marsh areas, tree islands and deep water aquatic refugia have been restored. In this area, there has been considerable attraction of wildlife subsequent to restoration, including otters, alligators, and turtles, which could not previously use the habitat because the canal was too deep. Upon completion waterflow between the east and the west will be restored, and the area will be restored to a wetland habitat from its current uplands habitat type. Backfilling of the C-109 canal is part of an interagency effort with the ACOE to restore as closely as possible to natural conditions the flow of water in the C-111 watershed area. C-111 mitigation includes removal of roadside spoil along the C-111 canal to restore the natural condition of the area. The mitigation was devised in coordination with the National Maine Fisheries Service (NMFS), which required mitigation for non-vegetated habitat types. Restoration also includes preserving some spoil areas as islands to maintain habitat for endangered species of plants. When the C-111 spoil mounds are scraped down, the fill will not fill the whole ditch. The ditch will, therefore, be a bit more valuable but will not be completely restored to its former elevation. FDOT will also remove roadside spoil along the west side of U.S. 1, upon which exotic species of plants had grown, and returning the area to its original grade. The Harrison Tract is a known habitat and nesting area for American crocodiles. Its wetlands functions were altered or eliminated by prior development of the land by its original owners. Restoration includes regrading the area to restore its original wetlands functions, including habitat for young and adult crocodiles. FDOT's mitigation of the Harrison Tract also includes restoration of tidal flushing to increase contributions of nutrients and food sources to the surrounding tidal bay system. Crocodiles have been observed using the restored areas. FDOT has installed additional nesting berm habitat, basking habitat and shallow lagoon habitat to promote juvenile crocodile development. The District established that the credit awarded for this mitigation and the conversion ratios utilized for determining this credit were consistent with agency practice and its pertinent rules. FDOT was given a 1:1 credit ratio for areas involving full restoration of wetlands. In other portions of the Harrison Tract mitigation involving restoration of flushing to existing wetlands, FDOT was given not full credit, but credit based on the severity of limitation of the existing wetland functions. Based on this evaluation, mitigation credits were given in a range of a 3:1 ratio for restoration of severely disrupted or non-existent wetlands to a 20:1 ration for restoration of higher quality but not fully functional wetlands. FDOT is being awarded 70 mitigation credits for the 252 acres in the Harrison Tract that are being restored or enhanced. CONCURRENT MITIGATION Based on the mitigation ratios developed by the District, additional mitigation credits were required. Consequently, the project contemplates mitigation that will be undertaken concurrently with the construction of the project in addition to the upfront mitigation. FDOT proposes to earn these additional credits by projects involving creation and/or restoration of emergent vegetation, mangrove and seagrass habitats. FDOT’s proposal to mitigate mangrove impacts with "out of kind" mitigation of emergent vegetation habitats was viewed by the District as being necessary and appropriate because there were no sufficiently large areas of mangrove habitat suitable for restoration. Table 7 of Attachment H to FDOT Exhibit 26 sets forth the four mitigation projects that constitutes the concurrent portion of the mitigation for the project. This table sets forth the acres mitigated, the conversion factor for the mitigation, and the resulting mitigation credit awarded. In addition, the table references certain credit for the placement of the hydrological culverts. As will be discussed later, that credit was withdrawn at the formal hearing. The four mitigation activities that will constitute the concurrent portion of the mitigation plan are: the removal of the Lake Surprise causeway (2.90 acres credit); the scrape down of the Jewfish Bridge approaches (0.67 acres credit); the restoration of the FGFWFC road (10.34 acres credit); and the Boca Chica project (27.17 acres credit) The Lake Surprise Causeway removal mitigation involves 5.26 acres of on-site seagrass restoration and 0.54 acres of unvegetated bottom mitigation through the excavation of 52,220 cubic yards of material. Lake Surprise historically was a shallow tidal lake supporting seagrasses before a causeway was built across the lake over the seagrasses. FDOT proposes to remove the causeway and restore the previous elevation, after which it is anticipated that seagrasses that grow on the east side of the causeway will fully recruit naturally to the excavated area. Removing the Lake Surprise Causeway will establish 5.26 acres of seagrass, for which FDOT received 2.63 acres of on-site mitigation credit based on a 2:1 ratio. Through natural recruitment after removal of the causeway, there is a high likelihood that the entire 5.26 acres will recolonize with seagrass. FDOT minimized the seagrass impacts to the greatest extent possible. The mitigation credit pertaining to Lake Surprise does not include credit for the removal of the causeway itself. This awarded credit is for the restoration of seagrass areas. The mitigation pertaining to the Jewfish Creek Bridge approaches proposes the scrape down of 1.33 acres of existing fill to allow the area to become recolonized with mangroves. Boca Chica is located in southern Monroe County over one hundred miles from the southern terminus of the project. This site was chosen by FDOT as a site for seagrass mitigation project after FDOT reviewed several other potential sites. Two other sites were rejected. The area around the C- 111 canal was rejected because the land proposed for use was in private ownership. Several defunct marinas in Port Bougainville were rejected due to poor conditions not conducive to seagrass growth. Boca Chica was finally chosen as the site because it was a large enough area with light and hydrological flow conditions conducive to seagrass growth. The evidence establishes that the Boca Chica site is the most viable for seagrass mitigation. The seagrasses to be impacted at Lake Surprise are healthy and productive turtle grass, manatee grass and cuban shoalgrass. Turtle grass is considered an extremely valuable “climax community” of seagrasses which hold sediments in place, cleanse water quality, and forms the base of the food chain. It is valuable to sea turtles, manatees and recreationally important fish and shellfish. The cuban shoalgrass that will colonize at Boca Chica is a pioneer colonizer species that grows in disturbed areas. It is not as valuable to the marine system as turtle grass. The Boca Chica seagrass mitigation permit condition proposed to offset impacts to 11.27 acres of seagrass. This will involve the removal of 306 cubic yards of sediment and hydraulically dredging approximately 1,175 cubic yards of spoil material. The proposed permit conditions state that FDOT shall provide future maintenance of the culvert areas to maintain adequate flushing. FDOT will plant 25.92 acres of seagrasses to mitigate for the remaining 8.64 acres of impacts, for a mitigation ratio of 3:1. In addition, 8.46 acres of seagrass will be planted to mitigate for the barren bottom area that will be affected, and 1.62 additional acres will be planted to compensate for any unexpected impacts to Boca Chica based on the necessary improvements. Overall, there will be of 36 acres of seagrass mitigation by FDOT, for which FDOT is receiving 27.17 acres credit. FDOT will also increase the water flow between the east and west lagoons of Boca Chica, and maintain the culverts connecting the two sides, in order to further promote growth of seagrass therein. FDOT is responsible for 80% survival of each acre of seagrass mitigation, as well as monitoring once a year for five years. Based on historical data obtained from Boca Chica during past mitigation efforts, there is a high likelihood that the entire 36 acres of mitigation will survive, and that the remaining 74 acres of the Boca Chica lagoons will experience natural recruitment of seagrass as a result of FDOT's efforts. The FGFWFC access area was built by excavating a ditch, and putting fill on the wetlands and creating a dirt road bed. After the C-109 canal is backfilled, the access road will no longer be needed. The mitigation project will excavate the existing road bed, back fill it into the ditch, thereby recreating the wetlands that were there previously. FDOT will receive 10.34 mitigation credits based on a 1:1 ratio of acres restored. EVALUATION OF MITIGATION There is no mitigation in this permit for any wetland impact beyond the direct loss of the specific 149 acres that will be dredged or filled. Mitigation was provided only for the direct, footprint impacts of the project. None of the up front mitigation involves the creation of wetlands, which entails converting areas that were not previously wetlands or open water and turning them into wetlands. It will likely take between 20 and 50 years for the mitigation areas to achieve full functional value required by the South Florida Water Management District mitigation permit. In the interim, there will be a net loss of wetland functional value. With time, the proposed mitigation has a high likelihood of success. Based on FDOT's past successes in mitigation of construction-related impacts, FDOT is able to comply with permit conditions relating to best management practices associated with the construction of bridges and pilings and turbidity screens around road construction, as well as restoration of seagrasses and mangroves. Petitioners assert that the District erred in determining the credit to be given for the up-front portion of the mitigation. While it is true that the SFWMD Rules do not mention "up-front" mitigation, the District has the authority to consider all aspects of a mitigation project in weighing its relative value. Consulting engineering inspectors have been retained by FDOT to insure that all permitting requirements are met during mitigation and construction, and that the technical special provisions for protection of threatened and endangered species are complied with by FDOT. The proposed permits contain appropriate conditions that require FDOT to monitor and maintain the mitigation areas. FDOT will be responsible in perpetuity for maintaining the tidal flushing connection at the Boca Chica mitigation site. Special permit condition 6 to the SWM and WRM staff reports require wetland and upland monitoring. If wetland and upland monitoring or other information demonstrate that additional adverse impacts have occurred due to this project, FDOT would be required to offset the loss of any additional wetland impacts. MITIGATION IS APPROPRIATE The evidence established that the mitigation projects were fairly and appropriately reviewed by SFWMD and that the mitigation credits were fairly and appropriately awarded. The evidence also established that there is appropriate mitigation for the direct, secondary, and cumulative impacts of this project. ACTIVITIES NOT RECEIVING MITIGATION CREDIT Mitigation credits for the 25 hydrologic culverts north of C-111 were originally included in the permit staff reports. Those mitigation credits were removed in an addendum to the staff reports, introduced as District's Exhibits 5 and 6. These credits were not necessary to offset project impacts. After the staff report was issued, they became a point of contention by the Petitioners because they will not be utilized until a management plan is developed. Since they were not necessary to meet mitigation requirements, the credits were removed from this project. These credits were never included in the mitigation ratios for these permit applications. The addendum removed the 9.6 credits initially contemplated for the culverts. No credit has been awarded for the relocation of threatened and endangered species of plants, such as Joewood and Bay Cedar by FDOT from the C-111, C-109 and roadside spoil mitigation areas. These species have been relocated to tree islands constructed by FDOT on the mitigation sites, or to other areas that would not be impacted by the project. FDOT also was not given mitigation credits for: (1) the wildlife crossings and the fencing that will funnel wildlife through these crossings; (2) installation of pipe culverts north of the C-111 canal and bridges and box culverts south of C-111; and which, in addition to providing a corridor for aquatic species, will increase the tidal flushing of the area; (3) the removal of the Lake Surprise Causeway, which will restore historical hydrological flow between the eastern and western sides of Lake Surprise; (4) FDOT's commitment to improve and maintain the flushing of the west lagoon culverts in Boca Chica (mitigation is in the east lagoon); and (5) FDOT's contribution of $300,000 to assist Monroe County in performing a carrying capacity study for the County. Additionally, FDOT will preserve the Jewfish Creek Bridge abutment, which will be preserved for local historical purposes. FDOT will prepare the Jewfish Creek Bridge pilings for an artificial reef at Long Key during construction. THE PUBLIC INTEREST TEST It is appropriate for the SWFMD to consider, in balancing the public interest test, to consider traffic safety and hurricane evacuation.3 Because of FDOT's expertise in those areas, it is appropriate for the permitting agency to give great weight to highway safety concerns, including hurricane evacuation, presented by FDOT. The application of the public interest test does not involve consideration of non-environmental factors other than those expressly set forth in the statutes such as navigation or preservation of historical or archaeological resources. Specifically, aesthetics, quality of life, the potential for a project to cause increased crime, and school overcrowding are not properly considered within any of the seven factors contained in Section 403.918(2)(a), Florida Statutes (1991). The District concluded that the project is clearly in the public interest based upon consideration and balancing of the following factors: hurricane evacuation improvements, public safety improvements, a SWM system where no SWM system currently exists; wildlife crossings and fencing north of the C-111 canal where no such crossings or fencing currently exist; wildlife box culverts to accommodate crocodiles, alligators, manatees and marine life where no such culverts currently exist; and hydrologic culverts, which have the potential to assist in the restoration of hydrologic flows, and the mitigation projects, both upfront and concurrent. SECTION 403.918(2)(a), FLORIDA STATUTES Section 403.918(2)(a), Florida Statutes, requires the permitting agency to determine “[w]hether the project will adversely affect the public health, safety, or welfare or the property of others." The property of others is not at issue. As discussed below, the evidence clearly established that the project will greatly enhance the safety of the road during normal operations and facilitate evacuation in the event of a hurricane. There will be clear benefits to the public safety as a result of this project. As part of the PD&E process, FDOT, through Metric, prepared "A Safety Evaluation" of the existing roadway. The safety analysis was based on FDOT accident statistics for the years 1983-1988, as well as engineering review of the conditions causing the accidents. Specifically, FDOT based their safety analysis on the following: 1) calculation of the abnormally high accident rate on the roadway based on the rate quality control formula set forth in the FDOT Highway Safety Improvement Guidelines, and approved by the Federal Highway Administration; 2) copies of the actual crash reports filed with the Florida Division of Highway Safety and Motor Vehicles, which provided detail greater than that generally available through FDOT's own accident data reports, and which formed the basis of the collision diagram in the Safety Evaluation (FDOT Exhibits 36; and 3) and its August 1996 update thereto (FDOT Exhibit 41), on-site evaluation and review of the roadway to determine geometrics of the roadway, locations of driveway accesses and side roadways and the degrees at which roadways intersected. Metric prepared an update of the Safety Evaluation for the years 1989-1994, to determine the continuing validity of the Safety Evaluation, as well as to review alternative proposals to the original proposed roadway configuration. In preparing the update, the recent accident data (FDOT Exhibit 37) and the underlying research in the Safety Evaluation were used by Metric Engineering in reaching its conclusions. The Safety Evaluation performed by Metric in 1989 established high accident rates on the roadway based on a detailed segmental analysis of the roadway. In August of 1996, the Safety Evaluation was updated by Metric, which update confirmed the findings of the Safety Evaluation, and further stated that accident frequency on the Monroe County portion of the roadway exceeded the state average accident rate and the abnormally high accident rate for the years 1990 through 1994 (notwithstanding the rear-end accidents occurring at Jewfish Creek). Fatal accidents on the Dade County portion exceed the state average on the same stretch by 37 percent for the same years. The most severe accidents occur on the Dade County portion. The Monroe County portion of the roadway exceeds the statewide average in the abnormally high accident rate four out of the last five years that FDOT studied. The Dade County portion does not exceed the accident frequency or the number of accidents, but the fatality rate in Dade County is much higher than the state average. Presently an abnormally high accident rate exists in three locations along the project corridor, two of which are in the vicinity of the Jewfish Creek bridge. The third location is north of the bridge on Cross Key. Replacing the Jewfish Creek Bridge with the fixed-height bridge proposed by FDOT will substantially increase the safety on the project corridor. The District considered this to be an important positive element in the public interest balancing test. The existing 2:1 slopes of the roadway make it difficult for drivers to recover from running off the roadway, resulting in a greater frequency of this type of accident. Moreover, the existing clear zone is not large enough to overcome the 2:1 slope to allow safe recovery of errant vehicles. As a result, catastrophic crashes occur rather than safe recoveries. Also, as with hurricane evacuation discussed in the following section, actual accidents on the roadway prevent traffic from accessing or leaving the Keys, and also prevent emergency vehicles from rapidly accessing the Keys and a crash site. This occurs because there is little or no shoulder or clear zone along the sides of the road to allow emergency vehicles to efficiently access an accident site, and in the event of a severe, head-on type collision, the roadway is blocked off. U.S. 1 through the project corridor is regarded as so unsafe for travel that Monroe County law enforcement officials call it "death alley." There are many head-on collisions due to the two-lane, no-median alignment. Law enforcement is difficult and dangerous along the roadway, because it has very few areas wide enough to allow law enforcement officials to detain driving violators. It is also very dangerous, for the same reasons, for a driver to pull off the roadway with a broken-down vehicle. High rates of speed and impaired drivers contribute to the accident rates along the project corridor. The efforts of law enforcement to control speeders and drunk drivers is impeded since it is practically impossible for enforcement officers to turn their vehicles around to pursue violators without running a high risk of causing an accident on their own. The project would significantly improve safety on the roadway by reversing the problems identified in the this section, as well as the previous sections of this Recommended Order. The project would virtually eliminate head-on collisions which largely contribute to serious injuries and fatalities along the roadway. The project would also help eliminate problems with emergency vehicle access to accident sites and restoration of service in the event of accidents, and would increase the roadway's level of service as discussed below. Improved level of service was an additional need considered by FDOT during the PD&E process. While the District did not consider the traffic level of service by itself to be weighted as part of the positive public interest criteria in this project, the impacts of resulting congestion are relevant to the public interest consideration of traffic safety as discussed in the foregoing sections. Lower quality level of service, as presently exists on the roadway through level of service F, adversely affects the safety of the roadway. When traffic levels rise, driver frustration increases leading to drivers passing in no-passing zones and potentially resulting in head-on collisions and high-severity accidents. Additionally, due to the narrow shoulders of the existing roadway, accident vehicles pose a threat to and impede normal traffic flow on the roadway. The Highway Capacity Manual set the standards for traffic engineering and is used in all fifty states. The manual classifies the existing roadway as a two-lane arterial rural road. Applying the standards for measuring level of service for two-lane rural roads set forth in the Highway Capacity Manual, FDOT determined that the existing level of service on the roadway is E, which is a very poor level of service that does not meet the established standard of level of service C required by the Highway Capacity Manual. Monroe County uses a speed based method of calculating level of service. Using that method, the level of service for U.S. 1 is at an acceptable level. The parties disagree as to which method of calculating the level of service is appropriate. That conflict is resolved by finding that the method used by FDOT is the appropriate method because of its wide acceptance and long-term use. Traffic volume in the area of the southern terminus of the project is growing at a rate average annual rate of 3.07 percent. In the present condition of the roadway, level of service will degrade to F, or forced-flow conditions, by the year 2006. Even with the improvements proposed by FDOT, the level of service in the northbound direction would improve to level of service B, but the level of service in the southbound direction would remain at level of service D or E due to the single southbound land configuration. Hurricanes pose a serious threat to the safety and welfare of residents and visitors of the Keys. Monroe County is the most vulnerable hurricane-prone area in the United States because it is surrounded by tropical waters, land elevation is low throughout the islands, and the evacuation routes are limited to U.S. 1, an extended route that starts in Key West and runs to the mainland, and Card Sound Road. The greatest potential for loss of life during a hurricane in the Keys is from storm surge. Storm surge is a dome of water near the center of a hurricane which is created by the winds on the water's surface. In a category 3, 4 or 5 storm, the entire land mass in the path of the storm will be inundated. Because of the wind and storm surge associated with hurricanes, the best response to a hurricane warning in the Keys is to evacuate people to the mainland away from the water and the storm surge threat. Accordingly, Monroe County orders a mandatory evacuation in a category 3, 4, or 5 hurricane, and no shelters are opened. There is little or no disagreement as to the vulnerability of the Keys to hurricanes or as to the danger posed by a hurricane. There is disagreement as to whether the proposed project is needed for improved hurricane evacuation. The conflicting evidence in this regard is resolved by the following findings, which are based on the more credible, substantial evidence. The existing road does not have sufficient hurricane evacuation capacity to meet the present and projected future needs of Monroe County residents and visitors. In current hurricane evacuations, the two northbound lanes on U.S. 1 between mile marker 90 and 106 are split at Key Largo. Sixty percent of the traffic is directed up the northbound lane of U.S. 1; forty percent of the traffic is diverted onto the northbound lane of Card Sound Road. One southbound lane of U.S. 1 and Card Sound Road must remain open for emergency vehicles to reach an accident or a disabled vehicle, or to bring emergency supplies into the Keys. Improving the roadway is critical to the success of Monroe County's hurricane evacuation plan. FDOT relied on hurricane evacuation and needs modeling performed by Monroe County and the ACOE to confirm the need for improvements. All of the models used indicated that the project corridor is the controlling roadway segment for improving hurricane evacuation of the Keys. Additionally, FDOT relied on the Lewis Report of January 15, 1993, a study commissioned by the Governor of Florida. Recommendation No. 17 of the Lewis report recommends that FDOT expedite the design and construction of the project, which is viewed as being critical for increasing the rate of emergency evacuation. Dr. Robert Sheets, former director of the National Hurricane Center, testified that the failure to make improvements to the roadway would be "unconscionable." Dr. Sheets and Billy Wagner, the Director of Emergency Management for Monroe County, presented very compelling and very persuasive testimony that this project is essential for hurricane evacuation purposes. The proposed project is the minimum transportation improvement that will achieve a significant improvement in evacuation safety and clearance time. With the present two- lane configuration and narrow shoulders, evacuating traffic would be halted completely by a vehicle breakdown or an accident blocking one lane. Replacement of the Jewfish Creek Bridge will also facilitate the hurricane evacuation need for the project. In addition to improving the rate of evacuation, the project will make an evacuation safer. Emergency personnel cannot reach accidents on the roadway during an evacuation because, in certain segments, no roadbed exists adjacent to the northbound lane. A second northbound lane and wider road shoulders would enable disabled vehicles to be serviced and removed from the highway. The proposed changes to the road would improve emergency vehicles' access to an accident scene. The elevation of the roadway at Lake Surprise is so low that it can be flooded easily by a storm. The proposed project would replace the existing muck bed of the roadway with more stable material. The existing roadway is subject to settling and washout during storm events, which reduce the safety of the roadway itself and reduce the evacuation capacity of the roadway. If washout occurs, moving equipment to the islands for recovery efforts following a hurricane will be difficult or impossible. The proposed project will prevent erosion and reduce the effects of storm surge and wave action on the road during a hurricane. When the project has been completed, three lanes of evacuating traffic, two lanes from U. S. 1 and a third from Card Sound Road, will converge at Florida City. Representatives of FDOT, the Monroe County Sheriff's Department, the Florida Department of Law Enforcement and Monroe County Emergency Management have planned to manage the northbound traffic when it reaches Florida City during an evacuation. Several feasible alternatives exist, but additional planning is needed to prevent a monumental bottleneck at the northern terminus of the project. While it is clear that this project will not resolve all problems that exist as to hurricane evacuation, it is also clear that this project is essential to improve hurricane evacuation. SECTION 403.918(2)(a)2, FLORIDA STATUTES Section 403.918(2)(a)2, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitats.” The District considered the effect of the direct loss of dredging and filling 149.07 acres of wetland. As set forth in previous sections, it is found that this loss will be offset by the mitigation. For use during construction of the project, FDOT will adhere to technical special provisions and special permit conditions 9 through 13 to protect manatees, crocodiles, alligators, indigo snakes, marine turtles, and valuable trees, palms and other wildlife, to minimize or preclude any impacts to those species. Additionally, any osprey nests around the Jewfish Creek Bridge area at the time of construction will be relocated by FDOT if necessary. As part of the development of the FEIS, as required by the Federal Highway Administration under the National Environmental Protection Act, FDOT obtained official letters of concurrence from the USFWS and NMFS that the project would cause no adverse impacts to endangered species under section 7 of the Endangered Species Act. That process also established the project's consistency with Florida Coastal Zone Management Program, as determined by the State Clearinghouse within the Office of the Governor, in coordination with DEP, the Department of National Resources and FGFWFC. The project also contains provisions to impact positively or enhance the conservation of fish and wildlife, including threatened or endangered species and their habitat, as described below. These were positive factors that further helped neutralize and offset the 149.07 acres of direct impacts. In addition, FDOT is required to evaluate the effectiveness of the fencing along the entire project corridor, discussed below, and report to the District on that effectiveness. If the District determines that the fencing could be more effective, it may require FDOT to implement those suggestions. South of the C-111 canal, construction of box culverts and bridges addresses impacts to the American crocodile, a listed endangered species. Problems were identified with placement of existing culverts, which did not provide enough clear space and which caused the crocodile to cross over the roadway rather than through the culvert. To address this problem, 15 larger box culverts and three bridges will be placed within the roadway. These provide the necessary clear space to allow the crocodile to safely pass under rather than over the road. The location of the box culverts was chosen by reviewing crocodile mortalities associated with road crossings. Placement of these box culverts and bridges will also improve the hydrological flow of water within the project area, provide a crossing area for manatees, and allow greater dispersal of the crocodile population throughout Florida Bay. Species expected to use these box culverts include aquatic and aquatic water dependent species in the area. They were primarily targeted for crocodiles, alligators, and manatees, but certain fishes, turtles, frogs and other species in the wetlands along the project corridor will utilize the culverts. The box culverts will have 100 feet of wingback fencing extending north and south of each culvert. The intent of the wingback fencing is to funnel wildlife into the box culverts. Intermittent or wingback fencing is appropriate south of the C-111 canal for two primary reasons. First, the animals which will be guided into the box culverts are aquatic dependent. The area south of the C-111 canal is primarily water, washed mangrove areas and tidal creeks. Crocodiles tend to move in tidal creeks. Second, it was not possible to ensure continuous fencing along all portions of the project south of the C-111 canal because there are existing businesses. It could not be assured that these businesses would keep a gate closed. The project originally proposed continuous fencing alongside the road where it abuts ENP. Continuous fencing was initially proposed because the initial application included a solid concrete barrier down the median of the road. If a crocodile did enter the road from the side with discontinuous fencing, after crossing one lane the crocodile would hit the barrier, but then easily find its way back to the area it came from. However, the project was later modified to include a tri-beam barrier because it lessens the footprint of the project and thereby lessens the wetland impact. Since the current application does not include a continuous barrier down the middle of the road, if a crocodile enters the road it would cross the tri-beam barrier, go across another lane of roadway before hitting a continuous fence. The animal would then run up and down that fence with nowhere to go except back across the road again. This would increase their exposure to a road kill. With the installation of bridges and culverts along the southern portions of the project corridor, there is no need for continuous fencing because aquatic wildlife, such as the American crocodile, will tend to follow the flow of water through the culverts rather than climb over the roadway. The FGFWFC and ENP oppose continuous fencing and prefer intermittent fencing south of C-111 canal since the project now includes a tri-beam barrier. Positive benefits also include construction of panther crossings at four locations north of the C-111 canal to account for impacts to the Florida panther, a listed endangered species, in the vicinity of the project, along with continuous fencing on both sides of the road north of the C- 111 canal. The crossings will be placed at locations that show historical use by wildlife, including areas at the Dade County Correctional Institute access roadway, the water control structure on the C-109 canal, and the berm of the C- 111 canal. The wildlife crossings are indicated by blue dots on FDOT's Exhibit 1. FDOT underwent years of extensive coordination with the environmental regulatory and resource agencies to design a project that would accommodate their ecosystem management plans. The location of the wildlife crossings was based upon radio telemetry data, collected from radio-collared panthers, and their typical corridor movement. The location was further chosen based on input from the USFWS and the FGFWFC. The continuous fencing north of the C-111 canal will prevent wildlife from crossing the road, and instead force them to use the wildlife crossings. The crossings were designed for panther use, the panthers being the shyest animal in the area. If panthers can be accommodated, then other threatened and endangered species and other wildlife are expected to use them. DOT studies of the effectiveness of wildlife crossings, with fencing, including crossings installed on Alligator Alley, establish that wildlife will use the crossings, both singly and in groups, and that the crossings substantially reduce, if not eliminate, automobile- related mortality of wildlife. Documented wildlife include panthers, wild turkeys, wading birds, alligators, deer, bobcats, black bears and raccoons. SECTION 403.918(2)(a)3, FLORIDA STATUES Section 403.918(2)(a)3, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling.” The replacement of the bascule bridge at Jewfish Creek with a 65-foot high fixed-height bridge will be a benefit to navigation. Because Jewfish Creek is part of the intracoastal waterway, the existing bridge has to be frequently raised or lowered to accommodate marine traffic. Because of the age of the existing structure, frequent breakdowns have been experienced. Marine traffic is stopped or delayed if the bridge cannot be raised or if there is a delay in raising the bridge. Vehicular traffic is stopped while the bridge is raised. Regarding the flow of water, the project incorporates wildlife box culverts and bridges, which will improve tidal flushing and the flow of water south of the C- 111 canal. The District considered this to be a positive consideration under the public interest test. The 25 hydrologic culverts north of the C-111 canal were also a positive factor in the test because the culverts provide future water management capability. Erosion and shoaling are neutral factors in the public interest test because the permit conditions contain a plan to control erosion and shoaling during construction and to provide for road stabilization after construction. In addition, there is a positive factor regarding shoaling in that the roadway area now has a lot of storm action, causing problems with erosion on the side of the road. The project provides for road stabilization, which is a neutral to positive factor in the public interest test. SECTION 403.918(2)(a)4, FLORIDA STATUTES Section 403.918(2)(a)4, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect the fishing or recreational values or marine productivity of the project.” A positive factor pertaining to marine productivity is the box culverts and bridges south of C-111, which will allow marine species to travel beneath the road to access the water on both sides of the road. Removal of the causeway along Lake Surprise opens that water body back up to one contiguous system, which is also a positive factor. The seagrass mitigation addressed in previous sections will also improve marine productivity and provide habitat for fish. SECTION 403.918(2)(a)5, FLORIDA STATUTES Section 403.918(2)(a)5, Florida Statutes, requires the permitting agency to consider “[w]hether the project will be of a temporary or permanent nature.” The project is permanent, though some construction impacts are temporary in nature. Once temporary impacts have ended and the project is complete, the project will be a positive benefit, because of the construction of the SWM system, culverts, animal underpasses and other benefits as set forth above. SECTION 403.918(2)(a)6, FLORIDA STATUTES Section 403.918(2)(a)6, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s. 267.061.” This factor is not at issue. SECTION 403.918(2)(a)7, FLORIDA STATUTES Section 403.918(2)(a)7, Florida Statutes, requires the permitting agency to consider “[t]he current condition and relative value of functions being performed by areas affected by the proposed activity.” A percentage of wetlands immediately adjacent to the road are impacted by exotic vegetation. Areas further out are part of a significant wetland ecosystem and are considered high quality. This project contains an exotic control program within FDOT's right of way, which is a positive consideration in the public interest test. Wetlands are currently receiving untreated storm water, which runs off the road immediately into the adjacent wetlands and water bodies without treatment. The project will include a SWM system where none currently exists as is detailed in the previous sections. This is a positive factor in the public interest test. The direct impacts of the project on 149 acres of wetlands alongside the roadway is not as large or significant as the impact caused by placement of the original embankment and resulting cut off of the eastern and western portions of the Everglades north of the C-111 canal. Overall, the concurrent and upfront mitigation efforts of FDOT are of regional significance and benefit to Everglades ecosystem by helping to repair the damage caused by the original embankment. THE PROJECT IS CLEARLY IN THE PUBLIC INTEREST The District appropriately weighed all considerations in determining that the project is clearly in the public interest. The greater weight of the competent, credible evidence established that the project is clearly in the public interest. RIGHT OF WAY PERMIT APPLICATION The land encompassed by the ROW permit has been properly adopted as a "work" of the District, requiring District authorization via a ROW Permit Modification to FDOT. The District's real property interest in the C-111 ROW applicable to the ROW permit modification consists of both fee simple and easement interests. The evidence is clear that DOT's application for the permit modification was thoroughly reviewed by the District, consistent with the District's established ROW permit review process. The District presented uncontroverted evidence and expert testimony to establish by a preponderance of the evidence that issuance of the permit modification to FDOT is consistent with all applicable District statutes, rules and other criteria, including the District's conditions for issuance of ROW Permits set forth in Rule 40E-6.301, F.A.C. FBII offered no evidence or testimony to the contrary. FUTURE MODIFICATIONS Modifying the project at a later date to pave a second southbound lane would require a District ERP permit. The addition of impervious surface triggers the District's SWM jurisdiction in this regard. However, FDOT established that that it had no current plans for further widening. The permit conditions require secondary and cumulative impacts associated with the increased capacity be addressed in accordance with the rules and criteria in effect at the time of any application for future widening. In addition, the permits require that FDOT must comply with any more stringent water quality criteria in effect at the time of any future widening. MODIFICATIONS AT THE FINAL HEARING At the Final Hearing, the District issued an Addendum to Staff Report for each of the SWM and WRM permits. The amendments made non-substantive changes to the District's staff reports regarding fencing along the roadway, performance of a study of fencing on the roadway by FDOT, water quality sampling along the roadway, assignment of mitigation credits, and other technical changes in wording for purposes of clarification. The changes set forth in the District's Exhibits 5 and 6 do not create impacts to the environment beyond those addressed elsewhere herein.

Recommendation Based on the foregoing findings of fact and conclusions of law it is RECOMMENDED that the Governing Board of the South Florida Water Management District enter a Final Order that issues the three permits challenged in this proceeding (SWM Permit No. 940606-10, WRM Permit No. 9460606-2-D, and ROW Permit No. 2584) subject to the conditions contained in the staff reports on the SWM permit application and the WRM permit application and subject to the additional permit conditions reflected by District Exhibits 5 and 6 and by the Findings of Fact pertaining to the permit for the relocation of the FKAA pipe. DONE AND ENTERED this 11th day of April, 1997, in Tallahassee, Leon County, Florida. ___________________________________ CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative this 11th day of April, 1997.

Florida Laws (8) 120.5714.31203.02373.016373.046380.0552380.067.29
# 2
STRAZZULLA BROTHERS, INC. vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 82-001639 (1982)
Division of Administrative Hearings, Florida Number: 82-001639 Latest Update: Jun. 21, 1991

Findings Of Fact The property has been annexed into the Acme Improvement District (Intervenor) by Special Act of the Florida Legislature. Petitioner purchased 487.7 acres of this tract from private owners in 1954. Subsequently, Petitioner purchased 653.59 acres from the Trustees of the Internal Improvement Fund of the State of Florida on or about March 4, 1960. The balance of the land constituting the property is a 224 acre hiatus tract owned by Marshall Brown with whom Petitioner has an agricultural use agreement. A parcel of Petitioner's land within the property includes a commercial lease to Malrite Corporation for siting a television antenna, consisting of 111 acres in the southeast corner of the property. This area is within the permit application. The tract is otherwise undeveloped and is currently submerged or semi- submerged during much of the year. Petitioner's development plan envisions drainage of this tract and use of the property for cultivation. The property is bounded on the north by Acme Improvement District, on the east by a subdivision called Homeland, on the west by Water Conservation Area #1, also known as the Loxahatchee Refuge, and on the south by undeveloped lands. The boundaries of the Loxahatchee Refuge actually encroach by approximately 300 feet into the property. The property development plan, which is the basis of this application, was prepared by the engineering firm Gee and Jensen. This plan calls for the creation of a 240 acre reservoir of a proposed 3 foot maximum depth. This reservoir would hold the internal stormwater runoff for subsequent agricultural irrigation. Perimeter dikes are to be constructed to prevent surface water runoff from outside areas entering the project and perimeter ditches are to be developed for the deliverance of stormwater runoff from the internal agricultural system to proposed pump stations located at the southwest corner of the development area. On the northwest corner of the proposed reservoir, the existing Acme Improvement District pump station No. 2 would be increased in capacity by 27,000 gallons per minute. Under Acme's charter and its statutory annexation of the property, the proposed reservoir and water management works would become a unit of development controlled by Acme. Under Petitioner's agreement with the hiatus tract owner, Acme would be the exclusive manager and operator of the proposed system, and the property would become an integral part of Acme's water management system. The Acme Water Improvement District is not solely an agricultural support enterprise but serves the various uses which may evolve within its boundaries. The area is currently zoned for limited residential development as well as agricultural. The television antenna facility located on the property is an example of a non-agricultural use. Petitioner's surface water management system is proposed to discharge into the Acme system, which in turn discharges offsite. Discharge into the Acme system is of a limited nature, but the system is designed to discharge for successive days under wet conditions. The design discharge is not limited to an extreme rainfall event but would probably occur during the traditional hydrologic cycle of south Florida. Under conditions which reflect actual rainfall over the past 20 years, the proposed surface water management system would have discharged 19 out of 20 years into the Water Conservation Area (Loxahatchee Refuge). In some years this discharge would have continued for approximately three months. The unrebutted testimony of expert witnesses called by Respondent established that the entire 1,393 acre tract referred to herein as "the property" is a freshwater wetland habitat. The western half is emergent marsh land, while the eastern half is forested with woody species. The wetlands on the property form a valuable wildlife habitat. Environmentally, they are in excellent condition. This area has not been adversely affected by drainage, fire or exotic species. These marshes also have good habitat diversity. The populations of aquatic invertebrates and forage fishes that are produced in these Everglades marshes are utilized by the many species of wading birds that feed in these wetlands. The proposed project will adversely affect wildlife species, including a variety of wading birds which will likely be unable to relocate. While this is undesirable from an environmental standpoint, conversion of this land would provide benefits from an agricultural standpoint, and would create additional water recreational facilities.

Recommendation From the foregoing, it is RECOMMENDED: That Respondent enter a final order denying the application. DONE and ORDERED this 30th day of November, 1983, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of November, 1983.

Florida Laws (6) 120.60373.044373.116373.403373.406373.413 Florida Administrative Code (3) 40E-1.60340E-4.09140E-4.301
# 3
SAVE THE MANATEE CLUB, INC., AND FRIENDS OF THE GREENWAY vs CITRUS RECREATIONAL MARINA, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-001723 (1996)
Division of Administrative Hearings, Florida Filed:Floral City, Florida Apr. 09, 1996 Number: 96-001723 Latest Update: Feb. 10, 1997

Findings Of Fact The Parties. Respondent, Citrus Recreational Marina, Inc. (hereinafter referred to as "Marina"), is a corporation. Marina is the applicant for the permit which is at issue in this proceeding. Respondent, the Florida Department of Environmental Protection (hereinafter referred to as the "Department"), is an agency of the State of Florida with the responsibility for, among other things, wetland resource permitting. The Department also has responsibility, pursuant to an agreement with the Southwest Florida Water Management District (hereinafter referred to as the "Water Management District"), for Management and Storage of Surface Water permitting within the jurisdictional boundaries of the Water Management District. Petitioner, Save the Manatee Club, Inc. (hereinafter referred to as "Save the Manatee"), is a non-profit, Florida corporation. The stated purpose of Save the Manatee includes protection of the manatee and its habitat through the promotion of public awareness, research and lobbying efforts. Petitioner, Friends of the Greenway (hereinafter referred to as "Friends"), is an organization which promotes responsible environmental policy in Citrus County. Save the Manatee and Friends are "citizens" of the State of Florida. They filed a verified petition for hearing in this matter. They alleged in the petition that the proposed facility will injure, harm, or otherwise pollute the state's natural resources. Members of Petitioners observe, study and enjoy manatee in Citrus County, including waters that would be impacted by the proposed facility. Marina's Permit Applications, the Department's Notice of Intent to Issue and the Petitioners' Challenge. On March 28, 1995, Marina applied to the Department for a permit for Management and Storage of Surface Water. On March 10, 1993, Marina applied to the Department for a wetland resources (dredge and fill) permit. The permits sought by Marina are associated with Marina's plan to construct a marina facility. The marina is to be constructed within an existing dolomite mine pit (hereinafter referred to as the "Mine Pit"). On or about February 6, 1996, the Department entered a notice of intent to issue the permit sought by Marina. A copy of the draft permit, permit number 092278259 and MS092681199, was attached to the notice of intent to issue. On or about March 13, 1996, Petitioners filed a Petition for Formal Administrative Hearing challenging the Department's proposed decision to issue the draft permit. Marina's Proposed Facility. Marina's proposed facility is to be located in Citrus County, Florida. Citrus County is located on the west coast of Florida, north of Tampa, Florida, and south of the mouth of the Suwannee River on the Gulf of Mexico. As part of the proposed facility, Marina proposed to construct 256 wet slips (122 of which may be covered) on six floating docks, a boat ramp, a boat lift bay, a 63-boat dry storage facility, a convenience store with fueling and sewage pump-out facilities, a clubhouse, a stormwater facility and a parking area. The proposed facilities will also include a potable water system. The water system will provide drinking water to the clubhouse, bait stand, fueling facility, boat storage area and the marina docks. The proposed facilities will also include an on-site wastewater treatment facility. The treatment facility will consists of an aerobic system with on-site effluent disposal through drainfield lines into the soil. No sewage treatment percolation ponds will be included on the proposed site. The stormwater system for the proposed site will be separate from the wastewater treatment facility. The stormwater system will include the collection and treatment of stormwater in on-site basins prior to discharge into the Mine Pit. The system will be designed to retain the entire rainfall from a 100-year storm combined with wet detention and on-line systems involving percolation. All these systems have been designed to meet the design standards required by Chapter 40D-4, Florida Administrative Code. The post development runoff discharge rate for the proposed site is projected to be less than the current rate of runoff discharge on the proposed site. The proposed facility will not cause any increased flood risks on-site or off-site. No part of the surface water management system will be located within 100 feet of any public supply well. The fish cleaning stations included for the proposed facility will be located over land. Waste associated with fish cleaning will be collected for disposal. Wastewater from the stations will be directed into the wastewater treatment system for the proposed facility. Wastewater from boats at the proposed facility will directed to the wastewater treatment facility through two pumpout stations located near the proposed fueling facility. Solid waste from the proposed facility and boats utilizing it will be disposed of in trash receptacles located throughout the proposed site. They will ultimately be picked up by a solid waste hauler for disposal. Erosion around the Mine Pit will be controlled through the placement of 2,200 feet of rip rap, vegetation planting and other erosion control techniques. The Mine Pit where the proposed marina is to be constructed is located on the south side of the Cross Florida Greenway Waterway (hereinafter referred to as the "Greenway Waterway") (formerly known as the "Cross Florida Barge Canal"), approximately one half mile east of where U.S. Highway 19 crosses the Greenway Waterway. The proposed site is approximately 4.75 miles from where the Greenway Waterway empties into the Gulf of Mexico. The Mine Pit is U-shaped, approximately 31.4 acres in size, and has an average depth of -20 feet, with pockets of -33 feet in depth. Marina proposed to fill the Mine Pit to 13.0 feet NGVD, place 2,285 linear feet of rip rap, and dredge 4.75 acres of the Mine Pit to -13.0 feet NGVD. The waters of the northwestern corner of the Mine Pit are separated from the waters of the Greenway Waterway by a plug of land approximately 100 to 150 feet wide. Marina proposed to remove the plug to create an entrance from the marina to the Greenway Waterway. The removal of the plug will result in a lowering of the level of water in the Mine Pit by approximately 3 to 5 feet to sea level, the level of the water in the Greenway Waterway. Marina also proposed to excavate a flushing canal channel between the Greenway Waterway and the northeast corner of the Mine Pit. The boundary of the property on which the Mine Pit is located is approximately 100 feet from the Mine Pit at its closest location. The Mine Pit was excavated from lime rock and Ona fine sands; Pits and Udorthents (both manmade) soil types exist throughout the project site. Weedy vegetation dominates the historically disturbed upland area surrounding the Mine Pit. Saltbush (Baccharis halimfolia), marsh elder (Iva frutescens), dog fennel (Eupatorium spp.), marsh fleabane (Pluches spp.), and waxmyrtle (Myrica cerifera) exist along the Greenway Waterway. Southern red cedars (Juniperius silcicola) are scattered throughout the area. Cattails (Typha spp.) have invaded the edges of the Mine Pit. Ownership of the Proposed Site Property. Marina has no ownership interest in the property where the Mine Pit is located. Nor has Marina ever held such an interest. The proposed facility site is held in three undivided interests. At the time the permit applications were filed by Marina, Marina had an option contract to purchase the proposed site. At the time of the final hearing of this matter, the option contract was no longer in force. Marina had also been authorized in writing prior to filing the permit applications to act as agent for the owners of the site for purposes of seeking environmental permitting. It was stipulated at the time of the final hearing that two of the three undivided interest owners had authorized Marina to act as their agent for purposes of obtaining the permits at issue in this proceeding. At the time of the final hearing, the third undivided interest owner did not authorize Marina to act as its agent for any purpose. Marina is agreeable to a new condition being added to the draft permit by the Department requiring Marina to submit documentation to the Department before any development of the proposed facility is commenced proving that Marina has acquired interests in the proposed site necessary for it to carry out the permit conditions. It is the Water Management District's policy in implementing Rule 40D- 4.301(g), Florida Administrative Code, which requires applicants to provide reasonable assurances concerning their proposed projects, is to require the land owner to be the permittee. The Greenway Waterway and the Surrounding Area. The Greenway Waterway consists of natural and man-made waters formerly intended to be used as the Cross Florida Barge Canal. The waters of the Greenway Waterway are classified as "Class III" waters. The Cross Florida Barge Canal was deauthorized on January 22, 1991. In its place was created the Cross Florida Greenways State Recreation and Conservation Area. The State of Florida owns the majority of the lands within the Cross Florida Greenways State Recreation and Conservation Area. The state can, therefore, control development along the Greenway Waterway. A portion of the Greenway Waterway was constructed as part of the Cross Florida Barge Canal by digging a canal from a spillway at Lake Rousseau, east-northeast of the proposed site, to the Gulf of Mexico. This portion of the canal (hereinafter referred to as the "Greenway Canal"), is straight and was designed for a depth of 12 feet. The actual depth of the Greenway Canal varies and, in some locations, is 18 feet deep. The Greenway Canal is also approximately 250 feet wide. The Greenway Canal intersects the Withlacoochee River, which is located to the east of the proposed facility. Prior to the construction of the Greenway Canal, the Withlacoochee River ran from a spillway at Lake Rousseau to the Gulf of Mexico. After construction of the Greenway Canal, the portion of the Withlacoochee River which connects with the Gulf of Mexico was, and still is, separated from the Greenway Canal by an earthen berm. The western portion of the Withlacoochee River (hereinafter referred to as the "Upper Withlacoochee"), continues to run from Lake Rousseau for approximately 1.3 miles to the Greenway Canal and then runs to the Gulf of Mexico through the Greenway Canal. The depth of the Upper Withlacoochee varies from river bottom which is exposed at low tide to areas of approximately 20 feet. The depth of water, the speed at which water flows and the amount of aquatic vegetation in the Upper Withlacoochee varies depending on the amount of water released from Lake Rousseau through the spillway. For the past year, the rate of flow in the Upper Withlacoochee has been relatively high. There are currently two public boat ramps, but no marinas, located on the Greenway Canal. One of those boat ramps is in disrepair and the evidence failed to prove that it is in use. There are no marinas on the Upper Withlacoochee or the Greenway Canal. There is a Florida Marine Patrol station located on the Greenway Canal approximately one-half mile east of U.S. Highway 19. Whether the presence of the station will have any impact on the enforcement of speed limits in the Greenway Canal is purely speculative. Approximately 2 miles west of the proposed facility is an existing active mining operation owned by Independent Aggregates. Barges transport mine product along the Greenway Canal from the mine to the Gulf of Mexico. Another organization, known as "Holnam", has been permitted by the Department to construct a barge-loading facility opposite the Independent Aggregates' barge facility and mine. It is unlikely, however, that Holnam will actually begin operating barges on the Greenway Canal. A speed limit of 25 miles per hour has been imposed by the Department throughout the Greenway Canal. The speed limit was imposed to protect West India Manatee that utilize the Greenway Canal. The Upper Withlacoochee has been designated an idle-speed zone by local ordinance. Crab traps are located along the banks of the Greenway Canal for approximately four miles into the Greenway Canal from the Gulf of Mexico. Traps are generally anchored to the bottom by lines and are spaced approximately 100 feet apart, 20 to 15 feet from the bank. A channel extends for approximately 12 to 15 miles into the Gulf of Mexico from the mouth of the Greenway Canal. The channel is marked. There are obstructions and shallow water outside this channel. Prudent boaters will continue in the channel for approximately four to nine miles before turning north or south into the Gulf of Mexico. Operators of smaller boats and those with knowledge of the area are able, however, to navigate north or south closer to shore. Impact on the Conservation of Fish and Wildlife, Including Endangered or Threatened Species, or Their Habitat. The West India Manatee is an endangered species, which means that it is in danger of extinction. Approximately 3000 manatees are found in Florida waters. Approximately half are located on the east coast and half on the west coast of Florida. There is little interchange between the two groups. The State of Florida is attempting to restore the manatee population to a size which will help to insure its survival as a species. In order for the manatee population to survive, human development and interaction with manatees must be managed. Manatee habitat needs to be preserved from development. Two of the most significant challenges to the survival of the manatee are the number of manatees killed by boats and the increasing number of boats in Florida waters. Collisions with boats is the greatest known cause of manatee deaths (approximately 25 percent). Manatee change locations frequently searching for food, drinking water, resting areas, potential mates and birthing areas. They also return to preferred habitat features. Manatee are attracted to areas that are calm and quiet for birthing areas. Shallow water, accessible from deeper water, is essential for birthing. After giving birth, the mother and calf generally remain in the area for some period of time, sometimes as long as months, until the calf is able to survive elsewhere. They will leave an area, however, if disturbed. Boat traffic, even at slow speeds, can cause disruption to mothers and young calves. Boat traffic can separate a mother and calf. There are approximately 300 manatee in the waters of northwestern Florida (from Tampa Bay to the Suwannee River), which includes the area of the proposed facility and Citrus County. This population has been increasing in recent years. Manatee in the waters of northwestern Florida require a stable source of warm water during the winter. During the winter ambient temperatures drop below the level at which the manatees' metabolism will sustain them. As a result of the need for warmer waters, most of the manatee in northwestern Florida spend the winter in Citrus County. Kings Bay, Crystal River and Homosassa all provide warm water locations for manatee. These sites are located to the south of the proposed facility. Kings Bay is the most important winter manatee habitat on the west coast of Florida. During the rest of the year, when waters are warmer, manatee leave their warm water, winter habitats to forage and investigate other habitat. Manatee that winter in the warm water sites in Citrus County generally migrate to the north. They travel to, and past, the mouth of the Greenway Canal, returning by the same general routes in the winter. Manatee also linger at the mouth of the Greenway Canal at the Gulf of Mexico because that area offers a combination of a relatively deep-water channel with adjacent shallow water and aquatic vegetation. Manatee use the waters of the Greenway Canal and the Upper Withlacoochee. The Greenway Canal is not, however, considered particularly good habitat for manatee. It has relatively deep water, steep banks, little fresh water and little vegetation of interest to manatee. In 1991 Citrus County adopted a Manatee Protection Plan as part of its comprehensive growth management plan. The Manatee Protection Plan does not identify the Greenway Canal as essential manatee habitat. The Manatee Protection Plan was adopted with the assistance of the Department. The Plan was based upon a compilation of manatee studies, marina inventory studies, and a comprehensive view of the county's waterway systems at the time the Plan was adopted. "Essential manatee habitat" is defined in the Manatee Protection Plan as "any land or water area constituting elements necessary to the survival and recovery of the manatee population from endangered status". Whether an area is "essential manatee habitat" is to be considered under the Plan as "a criteria for determining areas where dock facilities should be limited." The definition of "essential manatee habitat" for purposes of the Plan is different from the standard to be applied in by the Department in this case. The definition in the Plan is similar to the federal criteria considered and found to be different from that applicable to Department permitting cases in Metropolitan Dade County v. Coscan Florida, Inc., 609 So.2d 644, 651 (Fla. 3d DCA 1992). The Manatee Protection Plan contemplates that a master plan will be undertaken to establish the capacity of the Greenway Canal for boat and marina facilities. That master plan has not been developed. The fact that the master plan has not been formally undertaken, however, is of little consequence. The Department, due to the State's ownership of the land surrounding the Greenway Canal, has been able to consider possible uses of the Greenway Canal for boating and marinas without a formal master plan. The Manatee Protection Plan does not support a finding that the proposed facility will not have an adverse impact on the manatee. Although the waters of the Greenway Canal do not constitute good manatee habitat, the Upper Withlacoochee is considered good habitat, depending on the amount of water being released from the spillway at Lake Rousseau. Manatee have used the Upper Withlacoochee for feeding, resting and birthing. The Upper Withlacoochee has limited human activity, light boat traffic, sources of fresh water, a warm-water spring and aquatic vegetation. The Upper Withlacoochee has been used for birthing. Infant mortalities reported in the area suggest that the Upper Withlacoochee is used as a preferred birthing area. The rate of mortality suggests a higher rate of successful births. Aerial survey and mortality data also suggests that the Upper Withlacoochee and the Greenway Canal are utilized throughout the year by manatee. Greatest use is seasonal. Aerial survey data underestimates the number of manatee utilizing the Upper Withlacoochee and the Greenway Canal due to the lack of water clarity and due to the meandering course of, and vegetation along, the Upper Withlacoochee. Manatee mortality data concerning the Greenway Canal and the Upper Withlachoochee provides some indication of the fact that the number of manatee that travel through the Greenway Canal and the Upper Withlacoochee is not insignificant. While there was considerable evidence presented concerning whether the number of manatee that utilize the Greenway Canal and the Upper Withlacoochee is accurate or has been underestimated, based upon aerial survey data and manatee mortality comparisons, the critical fact proved by the evidence in this case is that a significant number of manatee do use the Upper Withlacoochee as habitat, including for birthing. The evidence also proved that, in order for manatee to use the Upper Withlacoochee, it is necessary that they travel the length of the Greenway Canal. Another critical fact proved by the evidence is to this matter is that manatee traveling to and from the Upper Withlacoochee must travel the Greenway Canal from the Gulf of Mexico past the proposed facility. The evidence was also unrefuted that increased boat traffic from the proposed facility will have the potential to adversely impact the manatee. That adverse impact will take the form of physical injury due to collisions and stress on manatee from increased human activity. The activity could reduce the use of the Upper Withlacoochee as habitat. What remains to be determined is whether the conditions of the draft permit will provide adequate assurances that the impact will not be contrary to the public interest. The Department's Bureau of Protected Species Management determined that, without the conditions to be added to the draft permit it suggested, the following impacts could be expected as a result of approval of the proposed facility: The probability of manatee/boat collisions increases with increasing boat traffic where boaters and manatees regularly inhabit the same waterways. While the current level of barge/vessel traffic does not appear to be a problem, increasing the amount of recrea- tional and commercial vessel traffic to the proposed levels in this narrow waterway is expected to adversely impact the endangered manatee. Barge trips may become more frequent, and barges traveling down the center of the canal drives manatees toward the edges of the canal. This increases the risk of manatee/recreational boat collisions, and increases the risk of these recreational boats driving manatees underneath, ahead of or behind traveling barges. The probability of lethal and sublethal propeller strikes increases. Also, there is not sufficient space for manatees between the canal bottom and the bottom of a fully loaded barge, with only one foot clearance as typical for loaded barges. The probability of a manatee being crushed will increase, and this impact is difficult to offset with conservation measures other than not allowing the activity. Page 2, Petitioners exhibit 7 and CRMI exhibit 10. The evidence in this case supports the foregoing conclusions. The increased boat traffic from the proposed facility, even if limited to sailboats and even if power boats are allowed at lower speed limits than currently in force in the Greenway Canal, may cause impacts with manatees due to the increased traffic and the use of the Greenway Canal by barges and recreational boats. It is possible that manatees, confronted by oncoming recreational boats and barges, may be forced into the path of barges and be crushed. Barges used by Independent Aggregates are approximately 72 feet wide and 250 feet long and are pulled or pushed by tugboats. The probability of this conflict taking place will be greater if barge use of the Greenway Canal is increased as proposed by Independent Aggregates. The greatest threat to the manatee of the proposed facility is the threat of death or injury as a result of cuts or blunt trauma from collisions of boats with manatees. This threat is primarily associated, however, with faster moving, power boats. Therefore, the extent of possible adverse impact on the manatee will be determined largely by the speed limit imposed in the Greenway Canal. To mitigate against the possible adverse impact on manatee, the Department has included certain conditions in the draft permit. Those conditions are found in Condition 6 of the draft permit and were recommended by the Department's Bureau of Protected Species Management. As a result of the Bureau of Protected Species Management's review of the proposed facility, it was recommended that the proposed facility not be approved if all of the conditions suggested by it were not included in the draft permit. All of the conditions recommended, except one, were included in the draft permit. The condition not included was one that provided that a violation of manatee speed zones would be grounds for revocation of the lease of any slip or dock space at the proposed facility. The lease revocation condition recommended by the Bureau of Protected Species Management was not included in the permit due to concern by the Department as to whether the condition could be legally imposed. The language of the memorandum of review of the proposed facility from the Bureau of Protected Species Management suggesting that the proposed project should not be approved unless all recommended conditions are accepted is standard language used by the Bureau and not intended to be strictly interpreted. The Bureau ultimately concluded that, despite its recommendation, it believes that the conditions of the draft permit are adequate to offset adverse impacts to the manatee. The Bureau's explanation is sufficient to eliminate any inference that otherwise may be drawn from its suggestion that the proposed facility should not be approved due to the exclusion of the permit condition concerning revocation of leases for speed zone violators. Condition 6 requires, among other things, that signs warning of possible manatee activity be displayed during construction, that personnel associated with the project be educated about the manatee, and that other measures designed to protect manatee during construction be followed. Due to the fact that most of the construction will take place in the enclosed Mine Pit, there should be little, if any adverse impact on manatee as as result of construction. Condition 6 also provides that permanent manatee warning signs and information concerning manatee be posted by the marina, and that a manatee awareness education program be established at the proposed facility. Condition 6 also limits the use of the boat ramp of the proposed facility to boats stored "on-site." The ramp will not be open to the general public. Finally, condition 6.l. provides the most important limitation of the use of the proposed facility. Condition 6.1 limits use of the proposed facility to sailboats and, therefore, prohibits the use of power boats: . . . until the applicant has provided documentation to the Department that manatee protection speed zones in the CFBC have been revised, approved by the Bureau of Protected Species Management, and posted in the CFBC. Occupancy of the facility by sailboats shall not be restricted. The limitation of the use of a marina to sailboats should adequately mitigate the adverse impacts to the manatee from the proposed facility. See Coscan, at 651. The effect of condition 6.l. is to allow Marina to obtain a modification of the draft permit after it is issued to allow power boats based upon events which may take place in the future. There are no guarantees that those events will result in reasonable assurances that the adverse impact to the manatee from power boat use at the proposed facility will not be contrary to the public interest. The speed zones which must be established and approved by the Bureau of Protected Species Management will be established, if at all, through rule- making procedures. See Rule 62N-22.011, Florida Administrative Code. The process would allow public input. Additionally, the outcome of the process would be subject to challenge under Chapter 120, Florida Statutes. Because of possible challenges to the efforts to impose speed zones, it is possible that speed zones adequate to reduce the adverse impacts to the manatee which would satisfy the public interest test applicable in this matter will not be adopted. The standards which the Department must adhere to in establishing speed zones are not the same standards applicable in this matter. In this matter, reasonable assurances must be given that there will not be adverse impacts to the manatee, a threatened species, contrary to the public interest. Establishing speed zones pursuant to other provisions of law will not insure that the reasonable assurances required for the issuance of the permit at issue in this case will be given. Although the resulting speed zones may be adequate to protect the manatee, there is no way to determine what kind of speed zones will be established. Without knowing the ultimate speed zones which may be established, or, more importantly, to know that the speed zones will meet the public interest test applicable in this matter, it is not possible to find the reasonable assurances Marina is required to provide at this time or at any time before the proposed facility is actually permitted. If reasonable assurances can be given that the use of power boats in the proposed facility will not be contrary to the public interest once speed zones are established, Marina or the owner of the proposed facility may apply for a permit modification. At that time the requisite reasonable assurances concerning power boat use can be determined. The provision of condition 6.l. allowing Marina to avoid seeking a permit modification at that time is, therefore, at a minimum, unnecessary, and at its worse, an effort to allow Marina to avoid having to provide the necessary reasonable assurances concerning the use of power boats. If only the impact on the manatee were considered in establishing speed zones, it could be concluded slow or idle speed should be imposed throughout the Greenway Canal and for some distance into the Gulf of Mexico in order to adequately reduce the adverse impact from the proposed facility on the manatee. Establishing speed zones, however, requires a consideration of other factors. The evidence in this case failed to address those factors sufficiently to recommend a condition to the draft permit concerning speed zones. Based upon the foregoing, it is concluded that reasonable assurances have not been given that there will not be unreasonable adverse impact to the manatee if the use of power boats at the proposed facility is allowed as provided in condition 6.l. of the draft permit. Other Public Interest Criteria. The evidence failed to prove that the proposed facility will adversely affect the public health, safety or welfare or the property of others. The evidence also failed to prove that the proposed facility will adversely affect navigation or the flow of water or cause harmful erosion or shoaling. The docks and other marina facilities will all be restricted to the Mine Pit, which is not now open to navigation. There is adequate width in the Greenway Canal to allow boats to exit the Mine Pit into the Greenway Canal and for boats and barges in the Greenway Canal to pass each other. Rip-rap to be placed along the Mine Pit shore and other shoreline stabilization activities will be adequate to prevent erosion and shoaling. Groundwater flow at the proposed site should not be adversely affected by the proposed facility, except as discussed, infra. The proposed facility should not adversely affect fishing or recreational values or marine productivity in the vicinity of the proposed facility. Recreational values (boating and fishing) should be enhanced as a result of the proposed facility. If condition 6.l. is not eliminated and power boats are allowed in the Greenway Canal, there are no assurances that the recreational value provided by the manatee will not be adversely impacted. The proposed facility is intended to be permanent. The evidence failed to prove that the proposed facility will adversely affect or enhance significant historical or archaeological resources under the provisions of Section 267.061, Florida Statutes. If condition 6.l. is not modified to eliminate the use of power boats automatically upon the establishment of speed zones, there are no reasonable assurances that the current condition and relative value of functions being performed by the Greenway Canal and the Upper Withlacoochee will not be adversely affected by the proposed facility. Otherwise, the proposed facility should not have an adverse impact on current conditions and relative value of current functions of the area. Groundwater Quality Standards. The general geology in the area of the proposed facility and the Greenway Canal is known as karst terrain. Karst terrain is geology formed by the solution of limestone over millions of years. Sequential episodes of exposure of the Floridan aquifer, which underlies the area, occurs in karst terrain as the result of the natural formation of sink holes. These sink holes impact the movement of groundwater. Information exists to reasonably describe the hydrogeology of the area in "regional" terms. There is insufficient information generally available about the specific hydrogeology of the proposed site or the immediately surrounding area. Underlying the entire area and the proposed site in particular is the Floridan aquifer. The properties of the Floridan aquifer in coastal Citrus County, including the proposed site, can vary enormously over relatively short vertical distances. This variability impacts the movement of groundwater. The groundwater under the proposed site is classified as G-II. The terms "potentiometric surface" are used to describe the level to which groundwater will rise above sea level. The higher groundwater rises above sea level, the thicker the layer of underlying drinkable water should be before reaching an interface between drinkable and undrinkable water. In central Citrus County, the potentiometric surface is relatively low and flat at approximately 5 or 6 feet above sea level. The resulting interface between drinkable and nondrinkable water is found at 200 or more feet. Due to natural geological conditions, moving to the northwest of Citrus County, including the Greenway Canal area, potentiometric levels are higher. Therefore, thicker layers of drinkable water should be found around the proposed facility site and the Greenway Canal than in central Citrus County. Because of higher potentiometric surface in the area of the Greenway Canal, the layer of drinkable water would be expected to continue beyond 120 feet below the surface. Construction of the Greenway Canal has resulted in the intrusion of saltwater from the Greenway Canal into the groundwater. It has also resulted in the upconing of mineralized (sulfate) waters from deeper to less deep levels within the Floridan aquifer. These impacts have been significant with regard to the chloride levels (from the saltwater) and sulfate upconing. The impact of the construction of the Greenway Canal on saltwater intrusion and sulfate upconing is the result of the lowering of the surface waters to sea level in the Greenway Canal. The lowering of the level of water in the Greenway Canal has had the effect of decreasing the potentiometric surface and, consequently, reducing the thickness of the layer of drinkable groundwater. Saltwater has intruded along and beneath the Greenway Canal. The extent of this intrusion is represented graphically on Petitioner's exhibits 13 and 14. Saltwater intrusion has occurred primarily as a result of downward leakage of saltwater traveling up the Greenway Canal. The saltwater intrusion has been localized around the Greenway Canal. The wedge of saltwater intrusion has reached to approximately where U.S. Highway 19 crosses the Greenway Canal, approximately one-half mile east of the proposed site. Although it is "theoretically" possible that the saltwater wedge could continue to move along the entire length of the Greenway Canal, the evidence fails to support such a conclusion. Due to freshwater discharges from Lake Rousseau, the evidence supports a conclusion that the saltwater wedge will not move further eastward to any significant extent. The lowering of the waters of the Greenway Canal to sea level has had the effect of bringing sea level elevations to the Floridan aquifer several miles further inland than had been the case before construction of the Greenway Canal. Groundwater adjacent to the Greenway Canal, which is at levels higher than sea level, has discharged into the Greenway Canal. This has caused a lower groundwater level and the movement upward of groundwater. Similar effects have occurred naturally along the Withlacoochee River. As groundwater rises it comes into contact with a geologic unit which contains calcium sulfate. The sulfate mixes with the groundwater causing the "mineralized" groundwater. While the change in surface waters in the Greenway Canal was quick, the change in groundwater quality from saltwater intrusion and sulfate upconing has taken place only as fast as groundwater in the area flows. Generally, groundwaters flow very slowly. The impact of the Greenway Canal on upconing of sulfates will continue over time. Mineralized waters will continue to move upward and, perhaps, laterally away from the Greenway Canal. Pockets of mineralized waters (containing sulfates) can be found naturally occurring around the proposed site. Sulfate enriched groundwater in coastal areas naturally move toward, and discharge into, the surface waters along the coastal boundary. This process occurs along the Gulf of Mexico and the shoreline of Citrus County. The construction of the Greenway Canal has disrupted this natural process. The Mine Pit, when it was in use, was dewatered to different levels at various times. The dewatering took place for varying periods of time. Usually, the Mine Pit would be completely dewatered for a period of approximately three months. On one occasion, the Mine Pit was dewatered for a period of two years (1989 to 1991). It was dewatered to allow the removal of dolomite. The Mine Pit was allowed to fill back up with water after each dewatering. The dewatering of the Mine Pit was regulated by the Water Management District. The permit allowing dewatering of the Mine Pit required that the permit holder mitigate for adverse impacts of dewatering, including the inducement of natural contaminants into the aquifer. The evidence failed to prove, however, the extent of adverse impacts of the dewatering or whether the permit holder actually mitigated against any such adverse impacts. The lowering of the water level in the Mine Pit caused some upconing of sulfates for the same reason that the digging of the Greenway Canal did. Lowering the water level in the Mine Pit lowered the potentiometric level. The evidence, however, failed to prove the extent of the impact or how long the impact lasted. The lowering of the water level of the Mine Pit to sea level by connecting the Mine Pit to the Greenway Canal as proposed by Marina will have the same general impact as the digging of the Greenway Canal on the upconing of sulfates. Unlike the impact of the dewatering of the Mine Pit, the proposed modification will be permanent. Lowering the water level will have the same type impact for the same reasons that the digging of the Greenway Canal caused upconing. The potentiometric level will be permanently lowered; the layer of drinkable water will be permanently decreased. The evidence failed to prove that the lowering of the water level of the Mine Pit to sea level as a result of the proposed project will have the same impact on saltwater intrusion. This impact is less likely because the Mine Pit is four and a half miles inland from the Gulf of Mexico. The upconing of sulfates as a result of the construction of the proposed facility will cause the levels of sulfates found in some portion of the currently drinkable layer of groundwater to exceed water quality standards. The area impacted will consist of groundwater which would otherwise have been expected to be potable. Comments concerning the proposed facility were provided to the Department by the Water Management District. By letter dated August 16, 1995, the Water Management District informed the Department that it was anticipated that the proposed facility would result in saltwater intrusion and upconing of mineralized water and that the area's groundwater could be expected to be degraded inconsistent with Water Management District rules. In response to the Water Management District's comments, Marina agreed to undertake a hydrogeologic study to gather site specific information to address those concerns. As a part of Marina's study, one monitoring well was drilled on the proposed site. The well was drilled to a depth of 450 feet in order to gather data concerning water quality at various depths. In early 1996, the Water Management District concluded that the results of the study undertaken by Marina had resolved its concerns. The test well was drilled to the south of the Mine Pit, approximately 2500 feet from the Greenway Canal. The water quality tests run on water taken from the test well reflected a sharp change in water quality at a depth of approximately 120 feet. The water below that level contained high levels of sulfates: 552 milligrams per liter of sulfate. Immediately above the high sulfate waters, low sulfate levels (12 milligrams per liter) were found. This result is contrary to what would be expected to be found based upon the higher potentiometric surface in this area of Citrus County. Because the potentiometric surface is higher in the area, it would be expected that the layer of drinkable groundwater would be considerably higher than 120 feet. The findings concerning the thickness of the drinkable groundwater found at the test well are consistent with the conclusions concerning the impacts of the digging of the Greenway Canal. As a result of the digging of the Greenway Canal and the lowering of the water level to sea level, the resulting decrease in the potentiometric surface has caused the upconing of mineralized waters and a decrease in the layer of drinkable groundwater. The Department and Marina have not disputed the fact that drinkable groundwater will be impacted by the upconing of mineralized waters (sulfates) as a result of connecting the Mine Pit with the Greenway Canal and lowering the level of water in the Mine Pit to sea level. The Department and Marina, however, have suggested that the extent of the impact of the lowering of the water level in the Mine Pit will not extend more than 100 feet from the Mine Pit and will be limited to the proposed site. The evidence failed to support this position. The unplugging of the Mine Pit will have the effect of increasing the area of water below sea level in the area by 12 percent of the size of the area of the Greenway Canal. Data from test wells around the Greenway Canal and other data has indicated that the upconing of mineralized water as a result of the lowering of the water level in the Greenway Canal has extended considerably more than 100 feet from the Greenway Canal. In light of the fact that the Mine Pit is equal in surface area to 12 percent of the surface area of the Greenway Canal, there is reason to be concerned that the area of impact from the lowering of the water level in the Mine Pit will also be significant. In light of the foregoing, and due to the variability of the geology of the area, the data from a single well on the site is of questionable value. Data from a single well simply does not provide the information necessary for Marina to provide reasonable assurances that the impact on groundwater from its proposed facility will be limited to an area of 100 feet from the Mine Pit. There is simply not enough data concerning the Mine Pit to conclude with any reasonable assurance that the upconing of mineralized waters (containing sulfates) will be limited to an area of 100 feet around the Mine Pit. Because of the size of the Mine Pit in relation to the Greenway Canal and the impact on upconing from the Greenway Canal, it is more likely that the impact of upconing will exceed 100 feet. A log of geologic characteristics of the test well was maintained. A confining unit or layer was found between the high-sulfate and low-sulfate waters at between 110 and 120 feet below the surface. The evidence failed to prove, however, the extent to which the layer may extend horizontally from the well location. In light of the general geology of Citrus County and the region around the proposed site, insufficient data exists to reach any conclusion about the extent of the confining layer. Establishing the extent of the confining layer would require more extensive (and costly) study of the site. The existence of a confining layer would also have no significant impact on the degree of upconing as a result of lowering the water level in the Mine Pit. I. Surface Water Quality Standards. Petitioners stipulated that the proposed facility would not violate surface water quality standards except with regard to the standard for chloride. Because of the flow of fresh water from Lake Rousseau and the flushing canal to be constructed at the proposed site, reasonable assurances have been given by Marina that there will be sufficient flushing of the Mine Pit to preclude a violation of chloride standards for surface waters. The evidence presented by Petitioners concerning the possibility that the salt water wedge resulting from the construction of the Greenway Canal may extend landward and eventually into the Mine Pit was too speculative and "theoretical".

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Department of Environmental Protection enter a Final Order denying Citrus Recreational Marina, Inc.'s application for wetland resource permit (dredge and fill) and the application for Management and Storage of Surface Waters Permit. DONE and ENTERED this 18th day of November, 1996, in Tallahassee, Florida. LARRY J. SARTIN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 18th day of November, 1996. COPIES FURNISHED: Robert Goodwin, Esquire Save the Manatee Club, Inc. 500 North Maitland Avenue, Suite 210 Maitland, Florida 32751 Peter Belmont, Esquire 511 31st Avenue, North St. Petersburg, Florida 33704 Wayne Hrydziusko Assistant General Counsel Douglas H. MacLaughlin Assistant General Counsel State of Florida, Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Richard S. Brightman, Esquire Douglas Roberts, Esquire HOPPING, GREEN, SAMS & SMITH, P.A. Post Office Box 6526 Tallahassee, Florida 32314 Perry Odom, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virginia B. Wetherell, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (7) 120.57267.061373.413373.414403.412403.851403.852 Florida Administrative Code (11) 40D-4.10140D-4.30162-312.01062-312.08062-4.04062-4.05062-4.07062-520.20062-520.42062-522.41062-550.320
# 4
BERNARD M. CAMPBELL AND BESSIE H. CAMPBELL vs SOUTHERN HY POWER CORPORATION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-000307 (1999)
Division of Administrative Hearings, Florida Filed:Inglis, Florida Jan. 22, 1999 Number: 99-000307 Latest Update: May 17, 2000

The Issue Whether Southern Hy Power Corporation (Hy Power) has provided reasonable assurance, based on plans, test results, or other information, that its proposed hydroelectric facility will comply with the Management and Storage of Surface Water (MSSW) statutes and rules of Southwest Florida Water Management District (SWFWMD) and the Wetland Resource Management permit (WRM)/water quality certification statutes and rules of the Florida Department of Environmental Protection (DEP).

Findings Of Fact By Joint Prehearing Stipulation the parties agreed to the following description of the parties and the project: PARTIES: The Department of Environmental Protection (the Department) is a government agency in the State of Florida existing by virtue of Section 20.255, Florida Statutes, and operating pursuant to Chapters 253, 373, 376, and 403, Florida Statutes, and Title 62, Florida Administrative Code. Under an interagency agreement with SWFWMD, the Department also implements Title 40D, Florida Administrative Code. The Department is located in Tallahassee, Florida, and it has a district office in Tampa, Florida, which district includes Levy County. Southern Hy Power Corporation is a Florida Corporation whose principal offices are located at 7008 Southwest 30th Way in Gainesville, Florida. Betty Berger is an interested party with a mailing address of Post Office Box 83, Inglis, Florida. The Campbells are an interested party with a mailing address of 245 Palm Street, Inglis, Florida. Hy Power applied on August 31, 1993, to the Department for a WRM permit/water quality certification to construct a hydroelectric facility on the Inglis By-Pass Channel. The project is located in Section 12, Township 17 South, Range 16 East, within the town of Inglis in Levy County. The facility consists of a powerhouse located on the south side of the channel measuring about 28 feet wide by 115 feet long, drawing water from the Inglis By-Pass Channel, passing it through a single-pit type turbine and discharging downstream of the Inglis By-Pass Spillway Dam. Hy Power applied on August 4, 1998, to the Department for a MSSW permit for the same proposed hydroelectric facility on the Inglis By-Pass Channel. DESCRIPTION OF PROPOSED PROJECT The project involves the construction of an intake structure, powerhouse, and tailrace on a 0.61-acre area located on the south side of the existing Inglis By-Pass Spillway. The facility will take advantage of the existing hydrostatic head that exists on either side of the Spillway Dam, to generate electricity. The powerhouse will be constructed below grade and will contain a single megawatt turbine and generating unit. The intake structure will divert flows from the upstream side of the Spillway Dam through the powerhouse and back into the By-Pass Channel. A small one-story control building and low profile substation will be constructed above grade within the boundaries of the project area. The hydroelectric project is considered to be a "Run of the River" type of facility because it can only use that water which flows down the existing channel. The geometry of the channel restricts flow to a certain amount, therefore the project cannot create or use flows above those that the By-Pass Channel can provide. The overall authority for control of water levels in Lake Rousseau and flow to the lower Withlacoochee River will remain with the DEP. Lake Rousseau was created in 1909 when the Inglis Dam was constructed across the Withlachoochee River for the purposes of hydroelectric generation. The dam impounds over 11 miles of the Withlachoochee River and forms a lake approximately 3,000 to 4,000 acres in size. Prior to construction of the Barge Canal, water released from the Inglis Dam would flow down the lower portion of the Withlachoochee River about 10 miles before entering into the Gulf of Mexico. In the mid to late 1960's the Army Corps of Engineers (ACOE) built a portion of the Cross Florida Barge Canal between the Gulf of Mexico and Lake Rousseau. The canal severed the Withlachoochee River downstream of the Inglis Dam causing its flow to be diverted into the Barge Canal and then into the Gulf. In order to maintain the flow of freshwater from Lake Rousseau to the lower segment of the River, the 8,900-foot long Inglis By- Pass Channel and Spillway were constructed. The resulting downstream flow ensures navigation in the lower portion of the River and sustains its freshwater and estuarine environment. The water level in Lake Rousseau is generally maintained at an elevation of 27.5 feet above mean sea level (msl) by a combination of the Inglis Dam, the Inglis Lock, which is located in the Barge Canal, and the By-Pass Channel Spillway. These water control features are known collectively as the Inglis Project Works. The water levels in the lower Withlachoochee River immediately to the west of the By-Pass spillway are close to sea level. The resulting head provides the potential energy needed to drive the proposed generator turbine. Under normal conditions the majority of water released from Lake Rousseau flows over the Spillway Dam into the lower segment of the River. According to the DEP Office of Greenways and Trails (OGT), the maximum capacity of the existing By-Pass Channel Spillway is 1,540 cubic feet per second. The hydroelectric project will divert whatever flow is allowed around the existing spillway through the turbine and back into the channel. When the Cross Florida Barge Canal project was cancelled in the 1990's, the ACOE transferred ownership of the property to the State of Florida Board of Trustees, who in turn has leased the property to the DEP for use as the Cross Florida Greenbelt State Recreation and Conservation Area. Management of this property, the control of river flow and lake levels, and operation of the Inglis Project Works are exercised by the DEP's OGT. The OGT utilizes a document entitled "Water Control Plan for Inglis Project Works," dated September 1994, as a guide to operating the structures. The Water Control Plan is incorporated as part of the MSSW intent to issue. On or about April 25, 1995, the Governor and Cabinet, sitting as the Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), approved a request from Hy Power to sublease 0.61 acres of Greenway property at the project site for the purpose of providing electric power. The request was challenged by Berger and the Campbells, and resulted in an administrative hearing held on November 3, 1995. As a result of the hearing, Administrative Law Judge Larry Sartin entered a Recommended Order on July 12, 1996, that the Board enter an order approving execution by the DEP of the proposed sublease and dismissing the petition of Berger and the Campbells. The Recommended Order was approved by the Trustees in its entirety in a Final Order dated April 12, 1996 ("Final Order"). Berger v. Southern Hy Power Corporation et al., Case No. 95-3589. A copy of the Final Order is listed as an exhibit to this Stipulation, and the Findings of Fact and Conclusions of Law contained therein are adopted herein. As previously ruled by the undersigned, the previous Final Order is res judicata as to Petitioners in this case, who are collaterally estopped from challenging any of the findings of fact or conclusions of law contained in the previous Final Order. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Final Order with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the Findings of Fact or Conclusions of Law in the Final Order. On February 21, 1995, Hy Power filed application with the Federal Energy Regulatory Commission (FERC) for a conduit exemption from the licensing requirements of Part I of the Federal Powers Act (FPA) for the proposed project. Petitioners and various other persons filed protests with FERC in opposition to the project. On April 21, 1997, FERC issued an Order Granting Conduit Exemption, a copy of which is listed as an exhibit to this Stipulation. Petitioners in this case are collaterally estopped from challenging any of the findings or conclusions contained in that Order Granting Conduit Exemption. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Order Granting Conduit Exemption with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the findings or conclusions in the Order Granting Conduit Exemption. FACTS ADDUCED AT HEARING OUTLINE OF PROJECT The proposed project calls for the construction of a water retention structure along the existing By-Pass spillway, the excavation of a large hole in which the powerhouse and turbine would be constructed "in-the-dry" south of the existing dam, and a millrace below the proposed project to return the water back into the existing water course. Conflicting testimony was received regarding the facts surrounding the construction of the project. These included: whether the proposed project will touch the existing wing walls of the existing dam; whether the water retention structure is a coffer dam; whether the proposed water retention structure will safely retain the water; whether the powerhouse and turbine have sufficient negative buoyancy to stay in the ground; whether the proposed excavation will weaken the existing dam; and whether the de-watering of the excavation site will adversely impact ground and surface water. PROJECT DESIGN AND ENGINEERING Engineering for the project was directed by witness Richard A. Volkin, a professional engineer and president and CEO of Engineering Company, Inc., based in Canton, Massachusetts. Mr. Volkin has extensive national and international experience in the design, management, and operation of hydroelectric facilities. Other engineers in Mr. Volkin’s firm worked on the project under Mr. Volkin’s direct supervision, including John May, who became registered as a professional engineer in Florida in order to sign and seal the engineering drawings for the project, which he initially did around 1994. Mr. May became ill and retired in 1998. Because of the length of time the application process has taken and the fact that Mr. May retired, there was a time while the application was pending, when Hy Power's design team was without a registered Florida engineer. When this was brought to the attention of Hy Power, Hy Power substituted Steven Crockett for Mr. May as the Florida-registered professional engineer of record for the project. DEP routinely accepts an applicant’s changing its engineer of record during the course of permit application or construction. Mr. Crockett is a civil and structural engineer who has considerable experience in preparing dam structural designs. Mr. Crockett independently reviewed and evaluated the engineering drawings for the project. Mr. Crockett resealed the drawings by using his drawn seal and signing the plans because his embossed seal was not readily available and time was of the essence. Mr. Crockett has advised DEP that he is now engineer of record for the project, using the appropriate DEP forms. Mr. Volkin’s firm performed all of the studies required by the various agencies, including a geotechnical study of the area, a 50-year analysis of water flow in and out of the Lake Rousseau regime, and water quality evaluations of water in the By-Pass Channel. The ACOE performed deep hole borings of the soils (approximately 36-40 feet below sea level) in the area of the project site to determine soil stabilization conditions at the site when they were constructing the Inglis Project Works. The soil conditions found can reasonably be expected to be similar today. Mr. Volkin’s company also took its own eight-foot deep surface core samples. The purpose of those samples was to verify the ACOE data. The new core samples verified the original core samples. Mr. Volkin also reviewed the ACOE’s engineering drawings developed from construction of the Spillway Dam. These show that the dam is founded on limestone bedding that has been stabilized with concrete. The hydroelectric facility will be constructed adjacent to and south of the dam structure and adjacent to and north of the barge canal. The same type of limestone bedrock is found in the area of the proposed construction. The facility design includes an intake channel on the upstream channel and a tailrace downstream. Those are the only structures that will be constructed next to the By-Pass Channel. The construction of the facility itself will be "in the dry." Hy Power will use coffer dams to seal off the construction site from the By-Pass Channel, so that there will not be water leakage from the Channel into the construction site. Water from the By-Pass Channel will enter the power plant when the coffer dams are lifted and the water is allowed to flow into the facility. The Petitioners presented the testimony of Bill Edwards, an individual with considerable experience in the construction of bridges, cofferdams, and similar concrete structures in aquatic and semi-aquatic conditions. Mr. Edwards is a former hard-hat diver who worked all over the world and worked in Florida for many years prior to his retirement. Based upon his experience and expertise in construction related to projects of this type, his testimony is credible and worthy of consideration. Mr. Edwards pointed out that if the proposed water retention structure did not touch the wing wall of the existing dam, it could not keep the water out and would not have the strength that it needed to retain the water. Hy Power’s witnesses explained that the retention structure would be set close enough to the existing wing wall that waterproofing materials could be placed between the two structures to keep the water out. Further, that the existing plans did not show interior bracing which would be included for structural strength and integrity. In sum, the retention structure will be in contact with existing dam’s wing wall, but will be free standing and not dependent upon the strength of the wing wall for its strength. Mr. Edwards pointed out that a cofferdam by definition has walls on all sides of the structure. The structure proposed by Hy Power did not have walls all the way around the proposed excavation. In rebuttal, Hy Power presented evidence that its plans were conceptual, design drawing and not construction plans. Hy Power represented that in actuality it would put as many walls as were necessary to keep the water out of the hole it intended to excavate. Trash racks will be constructed at the intake structures to protect aquatic life and make sure that trash and vegetation do not enter the intake structure or go down river. The trash rack bars will be two inches on center, which the U.S. Fish and Wildlife Service has determined as the appropriate size for the protection of fish. The turbine blades are "double regulated," and operate generally between 60 and 90 revolutions per minute. The design enables the turbine to operate at a constant speed to generate a consistent flow of electricity, notwithstanding the fact that the flow of the water may vary. The blade speed is not very fast, and the 2.5-meter blades provide a two to three-foot opening. This design acts to prevent fish mortality. There are four ways to shut off the flow of water through the proposed structure: close the pitch of the blades, close the wicket gates, allow the counter balance to the wicket gates to kick in and automatically close the gates, and close off the main gates. This is a fail safe system ("four level redundancy") designed to work upon any failure. Once water goes through the generator, its velocity is reduced to no greater than its intake rate which is a maximum of three feet per second. This prevents the water being discharged from the tailrace from causing erosion. If the head of water in the dam produces a flow exceeding three feet per second, it can be diverted over the other dams which will be functional. The power plant will be encased in concrete, except for a small access way that enables a person to go down a set of stairs to the plant. It will be a sealed, waterproof structure, as required by FERC and the ACOE. This will prevent penetration of groundwater, or flood waters in the event a massive flood overtops the plant. The only water entering the powerhouse will be through the turbine tunnel for power generation purposes. Mr. Edwards pointed out that the powerhouse was a closed structure and as such would have positive buoyancy, that is, it would float. Mr. Edwards pointed out that the proposed site is between the barge canal and By-Pass spillway and there is a great deal of groundwater and potentiometric pressure in the existing water table. In sum, there is a unlimited supply of groundwater at the site, and powerhouse could float out of the ground just like an empty swimming pool. Hy Power presented rebuttal evidence that the weight of the building, the turbine, and the water flowing through the turbine would be close to negative buoyancy, and they would add additional weight to the structure as necessary to keep it in place. The project is designed to generate three megawatts of electric power which is enough electricity to serve between 300 and 3000 homes, depending on usage. The project is designed to be unmanned. This is common for facilities such as this. The plant can be operated by remote control, unlike the existing controls at the By-Pass Dam, which are operated manually. DEP can access, monitor, and control remotely the generator's operation to include shutting the facility down at any time. There will be remote sensors to monitor water elevations. Flood protection will improve because of the ability of DEP to manage water flow from a remote location. If there is any major disruption, the plant will shut itself down. The project is classified as "green power." In other words, it generates natural energy without any disruption to the environment. The project will have minimal to no impact on the environment. There will be no significant changes in water quality compared to existing conditions as a result of either construction or operation of the facility. WRM Permit Criteria Hy Power has provided reasonable assurances that the proposed project will not cause a violation of state water quality standards of Section 403.918(a), Florida Statutes (1991). The parties stipulated that turbidity and dissolved oxygen were the two surface water quality issues of concern in this proceeding. The receiving water body is the Inglis By-Pass Channel. The Inglis By-Pass Channel is a Class III surface water. The project is not located in a OFW. While the lower Withlacoochee River is an OFW, the OFW designation runs up the natural river itself, and does not include the Spillway Dam, tailrace, or the remainder of the By-Pass Channel. There would be no degradation of water quality at the point of contact with the Withlacoochee River OFW. The DEP and FERC looked specifically at potential for turbidity and dissolved oxygen in determining whether the project would violate state water quality standards. The standards for turbidity and dissolved oxygen will not be violated. Because the By-Pass Dam is an under flow structure, a minimum of oxygenation currently occurs as water flows through the existing dam. The proposed project runs the water underground through the generator; however, Hy Power will measure the dissolved oxygen below the dam in the Lower Withlacoochee River. In the event there is any lowering of dissolved oxygen, Hy Power can install a "sparge ring" to reoxygenate the water going through the turbine so that dissolved oxygen remains at current levels. No turbidity will be added to the receiving water as a result of the project, because water velocity is low and the structure is encased in concrete and rip-rap. The only other potential for turbidity would occur when the coffer dams are removed after construction is complete. The coffer dams can be removed with the generator closed to permit any turbidity to settle. The amount of siltation that might occur when the generator is opened would be insignificant. Where a project is not in a OFW, an applicant must provide reasonable assurance that the project will not be contrary to public interest. See Section 403.918(2), Florida Statutes (1991). Hy Power has provided such assurances. The project will not directly affect public health, safety or welfare, or the property of others. See Section 403.918 (2)(a)1., Florida Statutes. There are concerns relating to the structural integrity of the proposed facility and adjacent structures which are discussed extensively below. The project will have no adverse impact upon the conservation of fish and wildlife, including threatened and endangered species and their habitat. See Section 403.918 (2)(a)2., Florida Statutes. While manatees are not likely to be found at the project site, the installation of the trash racks will eliminate any potential adverse impact on manatees. In fact, the racks will be an improvement over the current unprotected Spillway Dam. DEP procedures require a specific manatee control plan be implemented to deal with site specific concerns. The project will not adversely affect navigation or the flow of the water or cause harmful erosion or shoaling. See Section 403.918(2)(a)3., Florida Statutes. The project will not adversely affect fishing or recreation values or marine productivity in the vicinity of the project. See Section 403.918(2)(a)4., Florida Statutes. The permanent project and its construction will cause no significant environmental impacts. See Section 403.918(2)(a)5., Florida Statutes. There will be no adverse impacts to significant historical and archeological resources. Section 403.918(2)(a)6., Florida Statutes. With regard to the impact on current conditions and relative value of functions being performed by the areas affected by the proposed activity, there will be no negative impacts. See Section 403.918(2)(a)7., Florida Statutes. Improvement will result from better control of water flow at the project site, installation of trash racks and implementation of green power. THE FORESEEABLE ADVERSE SECONDARY OR CUMULATIVE IMPACTS Potential adverse secondary impacts related to power transmission are addressed through the fact that there is an existing power line corridor that can be used to transmit the electricity. Any need to change the corridor could be addressed by subsequent DEP permitting. Cumulative impacts are not at issue. Mr. Gammon, with Florida Power, acknowledged that the current electric company, presumably Florida Power, would be required by FERC to transport the electricity generated by Hy Power over its existing corridor and poles. No final decision has been made regarding how to access the site with equipment during construction. Several feasible construction options exist, and there are several ways of accessing the site with heavy equipment vehicles and without impacting wetlands. Any final decision would be subject to DEP approval. Since the project meets the public interest criteria of Section 403.918(2)(a), Florida Statutes, and wetland impacts are minimal, the project is permittable without the need for mitigation. See Section 403.918(2)(b), Florida Statutes. The ACOE has issued a permit for the facility. The permit varies slightly from the DEP intent to issue in the use of reinforced concrete rather than rip-rap on the bottom half of the intake channel. This is to comply with ACOE preference, but the variation has only an environmental benefit. Counsel for Petitioners sought to elicit testimony from Linda Sloan, Executive Director of the Withlacoochee Regional Planning Council, with regard to compliance of the proposed project with the Town of Inglis Comprehensive Plan and Land Development Code. Such compliance is not relevant to this proceeding. At any rate, Ms. Sloan conceded that any prohibition that might apply in the Land Development Code to construction of the proposed facility could potentially be alleviated by exemption or variance provisions in the Code. MSSW PERMIT CRITERIA The project will provide adequate flood protection and drainage in the conventional sense. See Rule 40D-4.301(1)(a), Florida Administrative Code. Because the amount of impervious area is minimal, runoff from the project will not in any way contribute to increased flooding or adversely impact drainage patterns. The total amount of impervious area of the facility is less than that of a single-family residence. SWFWMD rules do not even require MSSW permits for single-family residences because the impact is not significant. The only purpose for requiring a MSSW permit for the project is to review the project’s potential downstream impacts to the watershed, not stormwater runoff from the facility itself. The project will not cause adverse water quality or water quantity impacts on adjacent lands in violation of Chapter 373, Florida Statutes, or cause a discharge that violates state water quality standards. See Rule 40 D-4.301(1)(b), Florida Administrative Code. As indicated by the WRM water quality findings above, the project will not generally violate state surface water quality standards. See Rule 40 D-4.301(1)( c), Florida Administrative Code. The project will not generally cause adverse impact on surface or groundwater levels or flows. See Rule 40 D- 4.301(1)(d), Florida Administrative Code. Since the project is a run-of-the-river, it will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it under Chapter 40D-8, Florida Administrative Code. The project will not cause adverse environmental impacts, or adverse impacts to wetlands, fish, and wildlife or other natural resources. The project can be effectively operated and maintained. See Rule 40D-4.301(1)(g), Florida Administrative Code. The project is a slow speed, low maintenance facility. The design concept is well established and has been successfully used for many years. Possible adverse affects to public safety are discussed below. The project is consistent with the requirements of other public agencies. See Rule 40D-4.301(1)(i), Florida Administrative Code. Potential harm to water resources within the SWFWMD are discussed below. See Rule 40D-4.301(1)(j), Florida Administrative Code. The proposed project generally will not interfere with the legal rights of others. See Rule 40D-4.301(1)(k), Florida Administrative Code. The proposed project is not against public policy. See Rule 40D-4.301(1)(l), Florida Administrative Code. The project complies with the requirements contained in the Basis of Review. See Rule 40D-4.301(2), Florida Administrative Code. There is a dispute as to whether the project was within or at the edge of the 100-year flood plain. This dispute is related to how one interprets the rule as it relates to the millrace and the location of the facility which is under ground. In the conventional sense, the project is not in the flood plain. Further, the project is designed in such a way, that it is waterproof if it were topped with water. While in the past SWFWMD may have had concerns that the project might cause downstream flooding, SWFWMD currently has no such concerns, given the run-of-the-river status of the proposed project. The operation of the project will not cause downstream flooding. The DEP included in its intent to issue, conditions contained in the sublease between Hy Power and the DEP in order to ensure that the facility would remain run-of-the-river, would comply with the water control plan, and would otherwise comply with the terms of the sublease. The DEP has final control over water flow and can revoke the permit or otherwise take enforcement action against Hy Power if Hy Power fails to comply with the water control plan. GROUNDWATER IMPACTS Operation of the project will not cause groundwater contamination or otherwise have adverse groundwater impacts. Some concerns about groundwater during excavation of the construction site were raised. The conflicting evidence received regarding them is discussed below. An area of concern was the de-watering plan for the project. Everyone agrees there will be some water seepage into the construction site that will have to be pumped out. The parties disagree regarding the amount of water that will have to be removed. Their estimates of amount of water to be removed vary because their estimates of size and over-all depth of the site vary. Petitioners presented credible evidence that a potential exists for the construction site to have a large quantity of water because of its location between two sources of surface water (the By-Pass Channel and Barge Canal), because of the makeup of the subsurface, and because of the depth of the construction. Hy Power credibly represents that if excessive groundwater is found, it can address the adverse impacts through its de-watering plan that would have to be filed with FERC and DEP. The technology exists to address the de-watering of the project. Such plans are routinely considered by DEP after a construction permit is issued and before de-watering occurs. There is very little evidence of sinkhole activity in the project area, and the construction activities are not expected to cause any sinkhole activity. NOISE POLLUTION Mr. Bitter expressed concerns that FERC would require the facility to install a very loud siren that would result in sudden noise adverse to the well-being of neighbors. Mr. Bitter is unfamiliar with FERC siren requirements at run-of the-river hydroelectric facilities. In contrast, Mr. Volkin, who has substantial experience in this area, testified that the only alarm device that would be required would be for the protection of the workers during construction. The purpose of the alarm is to warn persons below a dam spillway of a change in the volume of water being let out of the impoundment. In the case of a run-of-the-river facility, the volume is near constant, changing only gradually. Therefore, even if a warning siren had to be installed its use would be limited to significant changes in flow or testing. This would not constitute a nuisance. Further, the facility is located in the vicinity of the Crystal River Nuclear Power Plant which has its own warning sirens. It would be prudent to make any warning devices required for this structure significantly different from those at the nuclear plant and to limit their use. DAM SAFETY AND FERC REVIEW In reviewing whether Hy Power’s applications complied with the relevant permitting criteria, the DEP took into consideration the review of the facility already performed by FERC. FERC will also be responsible for reviewing the project as it is being constructed. Mr. Edwards also raised concerns about the structural stability of the By-Pass Dam itself. This has been a subject of concern by those responsible for the dam, and a survey of the structure was conducted in 1993, referred to as the Greiner Report. The Greiner Report identified specific maintenance problems that have been and are being addressed by the DEP. However, DEP’s maintenance plan does not address specifically the possibility that the weight of the dam over time has caused some shifting in the dam. Hy Power has only a few core borings and only one at the location of the generator. Hy Power is using the ACOE’s original borings, as confirmed by several new ones, to develop its preliminary plans. The DEP considered FERC and the ACOE as responsible agencies for determining the structural integrity of the dam. DEP has taken FERC’s review of this facility into consideration as part of DEP’s own permitting review. It is normal for DEP to rely on outside sources and agencies for assistance in determining compliance with DEP permitting criteria such as public health and safety, and it is reasonable for DEP to do so in this instance. Most states do not have the full capability to evaluate dam safety, and so they rely on FERC and ACOE. On April 21, 1997, the project received a conduit exemption from FERC. The application process is illustrated in Hy Power Exhibit 11. Hy Power submitted to DEP detailed information about the dam, the associated structures and the proposed project which had been reviewed by FERC and the ACOE, the two agencies in the United States who are responsible for dam structure design, control, and administration. Included in the package was the Greiner Report and Hy Power’s review of it. FERC evaluated the project, the Inglis By-Pass Dam structure, and the proximity of the project to the Dam in relation to structural impact, upstream and downstream impacts, water quality, and environmental issues. Mr. Edwards raised concerns regarding the ability of the limestone bedrock to sustain additional construction in the area of proposed construction. This is a material issue in the controversy which impacts several aspects of the proposed construction. Mr. Edwards pointed out that the barge canal channel was constructed with the use of explosives that caused a fracturing of limestone bedrock. He pointed out that the steel panels, which Hy Power proposes to drive into the bedrock to construct the water retention structure necessary to excavate the hole into which the turbine and powerhouse would be placed, will further fracture this bedrock. This creates two potential dangers. It could permit water to move under and around the bottoms of the panels, potentially scouring the loosened material from the base of the panels and making them unstable and subject to failure. It could weaken the entire southern wing of the existing spillway dam. Mr. Edwards opined that this could result in catastrophic failure of the dam or the coffer dam. Such a failure would cause major destruction and loss of life to those persons living and working in and along the lower Withlacoochee River. Hy Power presented rebuttal evidence that it could and would, if necessary, inject concrete into the limestone to stabilize it and avoid the concerns raised by Mr. Edwards. FERC specifically evaluated concerns raised by project opponents over the poor physical condition of the By-Pass Channel Spillway structures, relying particularly on the 1993 Greiner Report. FERC noted that the DEP had entered into a contract to correct any deficiencies listed in the Greiner Report, which "did not conclude that the deficiencies at the By-Pass Spillway threaten downstream life and property." The FERC review concluded that the dam was safe. To ensure safety, FERC is requiring that Hy Power do a complete stability analysis of the dam prior to any construction. Articles 301 and 302 of the FERC exemption ensure that all final drawings and specifications be submitted to FERC prior to construction, along with a supporting design report consistent with FERC’s Engineering Guidelines; that FERC can require changes to assure a safe and adequate project; and that Hy Power must also submit approved coffer dam construction drawings and specifications at least 30 days prior to starting construction. FERC has its own engineering staff who will go to the site and do their own analysis, along with the ACOE, of the dam and structures, prior to any construction commencing. This is a detailed design review evaluation so that the latest information on the dam will be made known immediately prior to construction, and will prevent any catastrophic event from happening. Under FERC procedures, FERC requires the applicant to obtain the DEP permits prior to requiring applicant to submit more detailed construction designs for FERC's consideration. These more detailed designs in turn will be subject to further review by DEP and FERC. It is assumed that Hy Power will comply with the post- permitting procedures and requirements, and will present complete, detailed construction drawings for FREC and DEP approval. Hy Power’s failure to complete the process would result in denial of a construction permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the DEP enter a Final Order that issues the two permits challenged in this proceedings, WRM Permit No. 38-237096-3.001 and MSSW Permit No. 38-0129249-002, subject to the conditions contained in the Intents to Issue in the respective WRM and MSSW Permits and as described in the Recommended Order. DONE AND ENTERED this 2nd day of March, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2000. COPIES FURNISHED: Daniel H. Thompson, Esquire Berger Davis & Singerman 215 South Monroe Street, Suite 705 Tallahassee, Florida 32301 Andrew Zodrow, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John S. Clardy, III, Esquire Crider Law Firm Plantation Point 521 West Fort Island Trail, Suite A Crystal River, Florida 34429 Teri Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bernard M. Campbell Bessie H. Campbell 245 Palm Street Post Office Box 159 Inglis, Florida 34449 Sarah E. Berger Post Office Box 83 Inglis, Florida 34449

Florida Laws (6) 120.5720.255267.061373.026373.414471.025 Florida Administrative Code (6) 40D -4.30140D-4.09140D-4.30161G15-27.00162-4.08062-4.242
# 5
COUNCIL OF CIVIC ASSOCIATION, INC. vs KORESHAN UNITY FOUNDATION, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-000999 (1998)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Mar. 03, 1998 Number: 98-000999 Latest Update: Sep. 17, 1998

The Issue The issue is whether Respondent Koreshan Unity Foundation, Inc., is entitled to a environmental resource permit for the construction of a wooden footbridge over the Estero River east of U.S. Route 41 and authorization to obtain by easement a right to use sovereign submerged lands.

Findings Of Fact Respondent Koreshan Unity Foundation, Inc. (Koreshan) is a not-for-profit corporation dedicated to the preservation of the Koreshan heritage. Koreshan derives its heritage from a largely self-sufficient community that occupied land in south Lee County. For several years, Koreshan has owned a parcel of 14.56 acres at the southeast corner of U.S. Route 41 and the Estero River. This parcel is bounded on the south by Corkscrew Road and contains an amphitheater and historical house, midway between the river and Corkscrew Road. The south end of this parcel contains a museum and parking area with access to Corkscrew Road. The approximate dimensions of the 14.56-acre parcel are 544 feet along the river, 496 feet along Corkscrew Road, and about 1273 feet along the west and the east property lines. The west property line is U.S. Route 41. The right-of-way for U.S. Route 41 is wider at the southern two-thirds of the parcel than the northern one-third of the parcel. A sidewalk runs on the east side of U.S. Route 41 from north of the river, across the U.S. Route 41 bridge, along the west boundary of Koreshan's property, at least to an entrance near the middle of the 14.56-acre parcel. In October 1996, Koreshan acquired 8.5 acres of land at the northeast corner of the U.S. Route 41 and the river. The purpose of the acquisition was to provide parking for persons coming to Koreshan-sponsored events, such as music performances, at the 14.56-acre site. Koreshan rents a small portion of this northerly parcel to a canoe-rental business, which operates where the bridge and river meet. To assist their visitors-some of whom are elderly and disabled--in gaining access to the 14.56-acre site, on November 26, 1996, Koreshan filed an application for a permit and authorization to construct a wooden footbridge across the Estero River about 315 feet east of the U.S. Route 41 bridge. The source of the Estero River is to the east of the U.S. Route 41 bridge and the location of the proposed bridge. After passing under the U.S. Route 41 bridge, the river runs along the Koreshan state park, which is a short distance east of U.S. Route 41, before it empties into the Gulf of Mexico at Estero Bay, which is a state aquatic preserve. The portion of the river at the site of the proposed bridge is an Outstanding Florida Waterway (OFW) and a Class III water. The river is popular with canoeists and kayakers. Persons may rent canoes and kayaks at the canoe rental business operating on the 8.5-acre parcel or the Koreshan state park. Although most canoeists and kayakers proceed downstream toward the bay, a significant number go upstream past the U.S. Route 41 bridge. Upstream of the bridge, the river narrows considerably. Tidal currents reach upstream of the U.S. Route 41 bridge. At certain tides or in strong winds, navigating a canoe or kayak in this area of the river can be moderately difficult. Even experienced canoeists or kayakers may have trouble maintaining a steady course in this part of the river. Less experienced canoeists or kayakers more often have trouble staying on course and avoiding other boats, the shore, vegetation extending from the water or shoreline, or even the relatively widely spaced supports of the U.S. Route 41 bridge pilings, which are about 30 feet apart. Mean high water is at 1.11 feet National Geodetic Vertical Datum. The deck of the proposed footbridge would be 9 feet, 6 inches wide from rail to rail and 16 feet wide in total. The proposed footbridge would extend about 180 feet, spanning 84 feet of water from shore to shore. The bridge- ends would each be about 50 feet and would each slope at a rate of 1:12. The proposed footbridge would rest on nine pilings: four in the uplands and five in the submerged bottom. The elevation of the bottom of the footbridge from the water surface, at mean high water, would be 8 feet, 8 inches. The distance between the centers of the pilings would be 14 feet, and each piling would be of a minimum diameter of 8 inches. According to a special permit condition, the pilings would be treated with chromated copper arsenate, as a preservative, but they would be wrapped in impermeable plastic or PVC sleeves so as, in the words of the proposed permit, "to reduce the leaching of deleterious substances from the pilings." The proposed permit requires that the sleeves shall be installed from at least 6 inches below the level of the substrate to at least 1 foot above the seasonal highwater line and shall be maintained over the life of the facility. The proposed permit also requires that the footbridge be limited to pedestrian traffic only, except for wheelchairs. The permit requires the applicant to install concrete-filled steel posts adjacent to the bridge to prevent vehicles from using the bridge. The proposed permit requires that Koreshan grant a conservation easement for the entire riverbank running along both shorelines of Koreshan's two parcels, except for the dock and boat ramp used by the canoe-rental business. The proposed permit also requires Koreshan to plant leather fern or other wetland species on three-foot centers along the river banks along both banks for a distance of 30 feet. The proposed permit states that the project shall comply with all applicable water quality standards, including the antidegradation permitting requirements of Rule 62-4.242, Florida Administrative Code. Respondents did not raise standing as an affirmative defense. It appears that Petitioners or, in the case of corporate Petitioners, members and officers all live in the area of the Estero River and use the river regularly. For instance, Petitioner Dorothy McNeill resides one mile south of the proposed bridge on a canal leading to the Estero River, which she uses frequently. She is the president and treasurer of Petitioner Estero Conservancy, whose mission is to preserve the Estero River in its natural state. Petitioner Ellen W. Peterson resides on Corkscrew Road, 300-400 feet from the proposed footbridge. For 26 years, she has paddled the river several times weekly, usually upstream because it is prettier. She formerly canoed, but now kayaks. The record is devoid of evidence of the water- quality criteria for the Estero River at the time of its designation as an OFW or 1995, which is the year prior to the subject application. Koreshan has not provided reasonable assurance that the proposed footbridge would not adversely affect the water quality of the Estero River. Although the site of the proposed footbridge is devoid of bottom vegetation and there is no suggestion that this is anything but a natural condition for this part of the riverbottom, there is evidence that the proposed footbridge would adversely affect the water quality in two respects: turbidity caused by the pilings and leaching from the chromated copper arsenate applied to the pilings. The turbidity is probably the greater threat to water quality because it would be a permanent factor commencing with the completion of the installation of the pilings. The leaching of the heavy metals forming the toxic preservative impregnated into the pilings is probable due to two factors: damage to the PVC liner from collisions with inexperienced boaters and high-water conditions that exceed 1 foot over mean high water and, thus, the top of the liner. Both of these factors are exacerbated by flooding, which is addressed below. Koreshan also has failed to provide reasonable assurance that the proposed footbridge is clearly in the public interest under the seven criteria. The proposed footbridge would adversely affect the public health, safety, or welfare and the property of others through exacerbated flooding. South Lee County experienced serious flooding in 1995. In response, Lee County and the South Florida Water Management District have attempted to improve the capacity of natural flowways, in part by clearing rivers of snags and other impediments to flow, including, in the case of the Imperial River, a bridge. One important experience learned from the 1995 floods was to eliminate, where possible, structures in the river, such as snags and pilings, that collect debris in floodwaters and thereby decrease the drainage capacity of the waterway when drainage capacity is most needed. Longer term, the South Florida Water Management District is considering means by which to redirect stormwater from the Imperial River drainage to the Estero River drainage. The addition of five pilings (more as the river rose) would exacerbate flooding. On this basis alone, Koreshan has failed to provide reasonable assurance. Additionally, though, the HEC II model output offered by Koreshan does not consider flooding based on out-of-banks flows, but only on the basis of roadway flows. In other words, any assurances as to flooding in the design storm are assurances only that U.S. Route 41 will not be flooded, not that the lower surrounding land will not be flooded. Koreshan failed to provide reasonable assurance that the proposed activity would not adversely affect the conservation of fish and wildlife, for the reasons already stated with respect to water quality. Koreshan failed to provide reasonable assurance that the proposed activity would not adversely affect navigation or the flow of water. The flow of water is addressed above. Navigation is best addressed together with the next criterion: whether the proposed activity would adversely affect fishing or recreational values or marine productivity in the vicinity of the activity. Despite the presence of only two public launch sites, boating is popular on the Estero River. Reflective of the population growth of Collier County to the south and the area of Lee County to the north, the number of boaters on the Estero River has grown steadily over the years. The canoe- rental business located on the 8.5-acre parcel rented canoes or kayaks to over 10,000 persons in 1996. Many other persons launched their canoes or kayaks for free from this site and the nearby state park. Lee County businesses derive $800,000,000 annually from tourism with ecotourism a growing component of this industry. The Estero River is an important feature of this industry, and the aquatic preserve at the mouth of the river and the state park just downstream from the proposed footbridge provide substantial protection to the scenic and environmental values that drive recreational interest in the river. It is unnecessary to consider the aesthetic effect of a footbridge spanning one of the more attractive segments of the Estero River. The proposed footbridge and its five pilings effectively divide the river into six segments of no more than 14 feet each. This fact alone diminishes the recreational value of the river for the many canoeists and kayakers who cannot reliably navigate the U.S. Route 41 bridge pilings, which are more than twice as far apart. As to the remaining criteria, the proposed footbridge would be permanent and the condition and relative value of functions being performed by areas affected by the proposed activity is high. There is conflicting evidence as to whether the proposed footbridge would adversely affect the remnants of an historic dock, but it is unnecessary to resolve this conflict. The mitigation proposed by Koreshan does not address the deficiencies inherent in the proposed activity.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order dismissing the petition of Petitioner Council of Civic Associations, Inc., and denying the application of Respondent Koreshan Unity Foundation, Inc., for an environmental resource permit and authorization to obtain an easement for the use of sovereign land. DONE AND ENTERED this 3rd day of August, 1998, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of August, 1998. COPIES FURNISHED: Kathy Malone Vice President and Treasurer Council of Civic Associations, Inc. Post Office Box 919 Estero, Florida 33919-0919 Reginald McNeill Dorothy McNeill, President Estero Conservancy, Inc. 26000 Park Place Estero, Florida 33928 Mark E. Ebelini Humphrey & Knott, P.A. 1625 Hendry Street, Suite 301 Fort Myers, Florida 33901 Phyllis Stanley, President 12713-3 McGregor Boulevard Fort Myers, Florida 33919 Cathy S. Reiman Cummings & Lockwood Post Office Box 413032 Naples, Florida 34101-3032 Francine M. Ffolkes Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 F. Perry Odom, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (9) 120.52120.57120.68253.77267.061373.4136373.414373.421403.031 Florida Administrative Code (8) 18-21.00318-21.00418-21.0040118-21.00518-21.005162-302.20062-302.70062-4.242
# 6
SARAH E. BERGER vs SOUTHERN HY POWER CORPORATION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-000308 (1999)
Division of Administrative Hearings, Florida Filed:Inglis, Florida Jan. 22, 1999 Number: 99-000308 Latest Update: May 17, 2000

The Issue Whether Southern Hy Power Corporation (Hy Power) has provided reasonable assurance, based on plans, test results, or other information, that its proposed hydroelectric facility will comply with the Management and Storage of Surface Water (MSSW) statutes and rules of Southwest Florida Water Management District (SWFWMD) and the Wetland Resource Management permit (WRM)/water quality certification statutes and rules of the Florida Department of Environmental Protection (DEP).

Findings Of Fact By Joint Prehearing Stipulation the parties agreed to the following description of the parties and the project: PARTIES: The Department of Environmental Protection (the Department) is a government agency in the State of Florida existing by virtue of Section 20.255, Florida Statutes, and operating pursuant to Chapters 253, 373, 376, and 403, Florida Statutes, and Title 62, Florida Administrative Code. Under an interagency agreement with SWFWMD, the Department also implements Title 40D, Florida Administrative Code. The Department is located in Tallahassee, Florida, and it has a district office in Tampa, Florida, which district includes Levy County. Southern Hy Power Corporation is a Florida Corporation whose principal offices are located at 7008 Southwest 30th Way in Gainesville, Florida. Betty Berger is an interested party with a mailing address of Post Office Box 83, Inglis, Florida. The Campbells are an interested party with a mailing address of 245 Palm Street, Inglis, Florida. Hy Power applied on August 31, 1993, to the Department for a WRM permit/water quality certification to construct a hydroelectric facility on the Inglis By-Pass Channel. The project is located in Section 12, Township 17 South, Range 16 East, within the town of Inglis in Levy County. The facility consists of a powerhouse located on the south side of the channel measuring about 28 feet wide by 115 feet long, drawing water from the Inglis By-Pass Channel, passing it through a single-pit type turbine and discharging downstream of the Inglis By-Pass Spillway Dam. Hy Power applied on August 4, 1998, to the Department for a MSSW permit for the same proposed hydroelectric facility on the Inglis By-Pass Channel. DESCRIPTION OF PROPOSED PROJECT The project involves the construction of an intake structure, powerhouse, and tailrace on a 0.61-acre area located on the south side of the existing Inglis By-Pass Spillway. The facility will take advantage of the existing hydrostatic head that exists on either side of the Spillway Dam, to generate electricity. The powerhouse will be constructed below grade and will contain a single megawatt turbine and generating unit. The intake structure will divert flows from the upstream side of the Spillway Dam through the powerhouse and back into the By-Pass Channel. A small one-story control building and low profile substation will be constructed above grade within the boundaries of the project area. The hydroelectric project is considered to be a "Run of the River" type of facility because it can only use that water which flows down the existing channel. The geometry of the channel restricts flow to a certain amount, therefore the project cannot create or use flows above those that the By-Pass Channel can provide. The overall authority for control of water levels in Lake Rousseau and flow to the lower Withlacoochee River will remain with the DEP. Lake Rousseau was created in 1909 when the Inglis Dam was constructed across the Withlachoochee River for the purposes of hydroelectric generation. The dam impounds over 11 miles of the Withlachoochee River and forms a lake approximately 3,000 to 4,000 acres in size. Prior to construction of the Barge Canal, water released from the Inglis Dam would flow down the lower portion of the Withlachoochee River about 10 miles before entering into the Gulf of Mexico. In the mid to late 1960's the Army Corps of Engineers (ACOE) built a portion of the Cross Florida Barge Canal between the Gulf of Mexico and Lake Rousseau. The canal severed the Withlachoochee River downstream of the Inglis Dam causing its flow to be diverted into the Barge Canal and then into the Gulf. In order to maintain the flow of freshwater from Lake Rousseau to the lower segment of the River, the 8,900-foot long Inglis By- Pass Channel and Spillway were constructed. The resulting downstream flow ensures navigation in the lower portion of the River and sustains its freshwater and estuarine environment. The water level in Lake Rousseau is generally maintained at an elevation of 27.5 feet above mean sea level (msl) by a combination of the Inglis Dam, the Inglis Lock, which is located in the Barge Canal, and the By-Pass Channel Spillway. These water control features are known collectively as the Inglis Project Works. The water levels in the lower Withlachoochee River immediately to the west of the By-Pass spillway are close to sea level. The resulting head provides the potential energy needed to drive the proposed generator turbine. Under normal conditions the majority of water released from Lake Rousseau flows over the Spillway Dam into the lower segment of the River. According to the DEP Office of Greenways and Trails (OGT), the maximum capacity of the existing By-Pass Channel Spillway is 1,540 cubic feet per second. The hydroelectric project will divert whatever flow is allowed around the existing spillway through the turbine and back into the channel. When the Cross Florida Barge Canal project was cancelled in the 1990's, the ACOE transferred ownership of the property to the State of Florida Board of Trustees, who in turn has leased the property to the DEP for use as the Cross Florida Greenbelt State Recreation and Conservation Area. Management of this property, the control of river flow and lake levels, and operation of the Inglis Project Works are exercised by the DEP's OGT. The OGT utilizes a document entitled "Water Control Plan for Inglis Project Works," dated September 1994, as a guide to operating the structures. The Water Control Plan is incorporated as part of the MSSW intent to issue. On or about April 25, 1995, the Governor and Cabinet, sitting as the Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), approved a request from Hy Power to sublease 0.61 acres of Greenway property at the project site for the purpose of providing electric power. The request was challenged by Berger and the Campbells, and resulted in an administrative hearing held on November 3, 1995. As a result of the hearing, Administrative Law Judge Larry Sartin entered a Recommended Order on July 12, 1996, that the Board enter an order approving execution by the DEP of the proposed sublease and dismissing the petition of Berger and the Campbells. The Recommended Order was approved by the Trustees in its entirety in a Final Order dated April 12, 1996 ("Final Order"). Berger v. Southern Hy Power Corporation et al., Case No. 95-3589. A copy of the Final Order is listed as an exhibit to this Stipulation, and the Findings of Fact and Conclusions of Law contained therein are adopted herein. As previously ruled by the undersigned, the previous Final Order is res judicata as to Petitioners in this case, who are collaterally estopped from challenging any of the findings of fact or conclusions of law contained in the previous Final Order. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Final Order with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the Findings of Fact or Conclusions of Law in the Final Order. On February 21, 1995, Hy Power filed application with the Federal Energy Regulatory Commission (FERC) for a conduit exemption from the licensing requirements of Part I of the Federal Powers Act (FPA) for the proposed project. Petitioners and various other persons filed protests with FERC in opposition to the project. On April 21, 1997, FERC issued an Order Granting Conduit Exemption, a copy of which is listed as an exhibit to this Stipulation. Petitioners in this case are collaterally estopped from challenging any of the findings or conclusions contained in that Order Granting Conduit Exemption. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Order Granting Conduit Exemption with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the findings or conclusions in the Order Granting Conduit Exemption. FACTS ADDUCED AT HEARING OUTLINE OF PROJECT The proposed project calls for the construction of a water retention structure along the existing By-Pass spillway, the excavation of a large hole in which the powerhouse and turbine would be constructed "in-the-dry" south of the existing dam, and a millrace below the proposed project to return the water back into the existing water course. Conflicting testimony was received regarding the facts surrounding the construction of the project. These included: whether the proposed project will touch the existing wing walls of the existing dam; whether the water retention structure is a coffer dam; whether the proposed water retention structure will safely retain the water; whether the powerhouse and turbine have sufficient negative buoyancy to stay in the ground; whether the proposed excavation will weaken the existing dam; and whether the de-watering of the excavation site will adversely impact ground and surface water. PROJECT DESIGN AND ENGINEERING Engineering for the project was directed by witness Richard A. Volkin, a professional engineer and president and CEO of Engineering Company, Inc., based in Canton, Massachusetts. Mr. Volkin has extensive national and international experience in the design, management, and operation of hydroelectric facilities. Other engineers in Mr. Volkin’s firm worked on the project under Mr. Volkin’s direct supervision, including John May, who became registered as a professional engineer in Florida in order to sign and seal the engineering drawings for the project, which he initially did around 1994. Mr. May became ill and retired in 1998. Because of the length of time the application process has taken and the fact that Mr. May retired, there was a time while the application was pending, when Hy Power's design team was without a registered Florida engineer. When this was brought to the attention of Hy Power, Hy Power substituted Steven Crockett for Mr. May as the Florida-registered professional engineer of record for the project. DEP routinely accepts an applicant’s changing its engineer of record during the course of permit application or construction. Mr. Crockett is a civil and structural engineer who has considerable experience in preparing dam structural designs. Mr. Crockett independently reviewed and evaluated the engineering drawings for the project. Mr. Crockett resealed the drawings by using his drawn seal and signing the plans because his embossed seal was not readily available and time was of the essence. Mr. Crockett has advised DEP that he is now engineer of record for the project, using the appropriate DEP forms. Mr. Volkin’s firm performed all of the studies required by the various agencies, including a geotechnical study of the area, a 50-year analysis of water flow in and out of the Lake Rousseau regime, and water quality evaluations of water in the By-Pass Channel. The ACOE performed deep hole borings of the soils (approximately 36-40 feet below sea level) in the area of the project site to determine soil stabilization conditions at the site when they were constructing the Inglis Project Works. The soil conditions found can reasonably be expected to be similar today. Mr. Volkin’s company also took its own eight-foot deep surface core samples. The purpose of those samples was to verify the ACOE data. The new core samples verified the original core samples. Mr. Volkin also reviewed the ACOE’s engineering drawings developed from construction of the Spillway Dam. These show that the dam is founded on limestone bedding that has been stabilized with concrete. The hydroelectric facility will be constructed adjacent to and south of the dam structure and adjacent to and north of the barge canal. The same type of limestone bedrock is found in the area of the proposed construction. The facility design includes an intake channel on the upstream channel and a tailrace downstream. Those are the only structures that will be constructed next to the By-Pass Channel. The construction of the facility itself will be "in the dry." Hy Power will use coffer dams to seal off the construction site from the By-Pass Channel, so that there will not be water leakage from the Channel into the construction site. Water from the By-Pass Channel will enter the power plant when the coffer dams are lifted and the water is allowed to flow into the facility. The Petitioners presented the testimony of Bill Edwards, an individual with considerable experience in the construction of bridges, cofferdams, and similar concrete structures in aquatic and semi-aquatic conditions. Mr. Edwards is a former hard-hat diver who worked all over the world and worked in Florida for many years prior to his retirement. Based upon his experience and expertise in construction related to projects of this type, his testimony is credible and worthy of consideration. Mr. Edwards pointed out that if the proposed water retention structure did not touch the wing wall of the existing dam, it could not keep the water out and would not have the strength that it needed to retain the water. Hy Power’s witnesses explained that the retention structure would be set close enough to the existing wing wall that waterproofing materials could be placed between the two structures to keep the water out. Further, that the existing plans did not show interior bracing which would be included for structural strength and integrity. In sum, the retention structure will be in contact with existing dam’s wing wall, but will be free standing and not dependent upon the strength of the wing wall for its strength. Mr. Edwards pointed out that a cofferdam by definition has walls on all sides of the structure. The structure proposed by Hy Power did not have walls all the way around the proposed excavation. In rebuttal, Hy Power presented evidence that its plans were conceptual, design drawing and not construction plans. Hy Power represented that in actuality it would put as many walls as were necessary to keep the water out of the hole it intended to excavate. Trash racks will be constructed at the intake structures to protect aquatic life and make sure that trash and vegetation do not enter the intake structure or go down river. The trash rack bars will be two inches on center, which the U.S. Fish and Wildlife Service has determined as the appropriate size for the protection of fish. The turbine blades are "double regulated," and operate generally between 60 and 90 revolutions per minute. The design enables the turbine to operate at a constant speed to generate a consistent flow of electricity, notwithstanding the fact that the flow of the water may vary. The blade speed is not very fast, and the 2.5-meter blades provide a two to three-foot opening. This design acts to prevent fish mortality. There are four ways to shut off the flow of water through the proposed structure: close the pitch of the blades, close the wicket gates, allow the counter balance to the wicket gates to kick in and automatically close the gates, and close off the main gates. This is a fail safe system ("four level redundancy") designed to work upon any failure. Once water goes through the generator, its velocity is reduced to no greater than its intake rate which is a maximum of three feet per second. This prevents the water being discharged from the tailrace from causing erosion. If the head of water in the dam produces a flow exceeding three feet per second, it can be diverted over the other dams which will be functional. The power plant will be encased in concrete, except for a small access way that enables a person to go down a set of stairs to the plant. It will be a sealed, waterproof structure, as required by FERC and the ACOE. This will prevent penetration of groundwater, or flood waters in the event a massive flood overtops the plant. The only water entering the powerhouse will be through the turbine tunnel for power generation purposes. Mr. Edwards pointed out that the powerhouse was a closed structure and as such would have positive buoyancy, that is, it would float. Mr. Edwards pointed out that the proposed site is between the barge canal and By-Pass spillway and there is a great deal of groundwater and potentiometric pressure in the existing water table. In sum, there is a unlimited supply of groundwater at the site, and powerhouse could float out of the ground just like an empty swimming pool. Hy Power presented rebuttal evidence that the weight of the building, the turbine, and the water flowing through the turbine would be close to negative buoyancy, and they would add additional weight to the structure as necessary to keep it in place. The project is designed to generate three megawatts of electric power which is enough electricity to serve between 300 and 3000 homes, depending on usage. The project is designed to be unmanned. This is common for facilities such as this. The plant can be operated by remote control, unlike the existing controls at the By-Pass Dam, which are operated manually. DEP can access, monitor, and control remotely the generator's operation to include shutting the facility down at any time. There will be remote sensors to monitor water elevations. Flood protection will improve because of the ability of DEP to manage water flow from a remote location. If there is any major disruption, the plant will shut itself down. The project is classified as "green power." In other words, it generates natural energy without any disruption to the environment. The project will have minimal to no impact on the environment. There will be no significant changes in water quality compared to existing conditions as a result of either construction or operation of the facility. WRM Permit Criteria Hy Power has provided reasonable assurances that the proposed project will not cause a violation of state water quality standards of Section 403.918(a), Florida Statutes (1991). The parties stipulated that turbidity and dissolved oxygen were the two surface water quality issues of concern in this proceeding. The receiving water body is the Inglis By-Pass Channel. The Inglis By-Pass Channel is a Class III surface water. The project is not located in a OFW. While the lower Withlacoochee River is an OFW, the OFW designation runs up the natural river itself, and does not include the Spillway Dam, tailrace, or the remainder of the By-Pass Channel. There would be no degradation of water quality at the point of contact with the Withlacoochee River OFW. The DEP and FERC looked specifically at potential for turbidity and dissolved oxygen in determining whether the project would violate state water quality standards. The standards for turbidity and dissolved oxygen will not be violated. Because the By-Pass Dam is an under flow structure, a minimum of oxygenation currently occurs as water flows through the existing dam. The proposed project runs the water underground through the generator; however, Hy Power will measure the dissolved oxygen below the dam in the Lower Withlacoochee River. In the event there is any lowering of dissolved oxygen, Hy Power can install a "sparge ring" to reoxygenate the water going through the turbine so that dissolved oxygen remains at current levels. No turbidity will be added to the receiving water as a result of the project, because water velocity is low and the structure is encased in concrete and rip-rap. The only other potential for turbidity would occur when the coffer dams are removed after construction is complete. The coffer dams can be removed with the generator closed to permit any turbidity to settle. The amount of siltation that might occur when the generator is opened would be insignificant. Where a project is not in a OFW, an applicant must provide reasonable assurance that the project will not be contrary to public interest. See Section 403.918(2), Florida Statutes (1991). Hy Power has provided such assurances. The project will not directly affect public health, safety or welfare, or the property of others. See Section 403.918 (2)(a)1., Florida Statutes. There are concerns relating to the structural integrity of the proposed facility and adjacent structures which are discussed extensively below. The project will have no adverse impact upon the conservation of fish and wildlife, including threatened and endangered species and their habitat. See Section 403.918 (2)(a)2., Florida Statutes. While manatees are not likely to be found at the project site, the installation of the trash racks will eliminate any potential adverse impact on manatees. In fact, the racks will be an improvement over the current unprotected Spillway Dam. DEP procedures require a specific manatee control plan be implemented to deal with site specific concerns. The project will not adversely affect navigation or the flow of the water or cause harmful erosion or shoaling. See Section 403.918(2)(a)3., Florida Statutes. The project will not adversely affect fishing or recreation values or marine productivity in the vicinity of the project. See Section 403.918(2)(a)4., Florida Statutes. The permanent project and its construction will cause no significant environmental impacts. See Section 403.918(2)(a)5., Florida Statutes. There will be no adverse impacts to significant historical and archeological resources. Section 403.918(2)(a)6., Florida Statutes. With regard to the impact on current conditions and relative value of functions being performed by the areas affected by the proposed activity, there will be no negative impacts. See Section 403.918(2)(a)7., Florida Statutes. Improvement will result from better control of water flow at the project site, installation of trash racks and implementation of green power. THE FORESEEABLE ADVERSE SECONDARY OR CUMULATIVE IMPACTS Potential adverse secondary impacts related to power transmission are addressed through the fact that there is an existing power line corridor that can be used to transmit the electricity. Any need to change the corridor could be addressed by subsequent DEP permitting. Cumulative impacts are not at issue. Mr. Gammon, with Florida Power, acknowledged that the current electric company, presumably Florida Power, would be required by FERC to transport the electricity generated by Hy Power over its existing corridor and poles. No final decision has been made regarding how to access the site with equipment during construction. Several feasible construction options exist, and there are several ways of accessing the site with heavy equipment vehicles and without impacting wetlands. Any final decision would be subject to DEP approval. Since the project meets the public interest criteria of Section 403.918(2)(a), Florida Statutes, and wetland impacts are minimal, the project is permittable without the need for mitigation. See Section 403.918(2)(b), Florida Statutes. The ACOE has issued a permit for the facility. The permit varies slightly from the DEP intent to issue in the use of reinforced concrete rather than rip-rap on the bottom half of the intake channel. This is to comply with ACOE preference, but the variation has only an environmental benefit. Counsel for Petitioners sought to elicit testimony from Linda Sloan, Executive Director of the Withlacoochee Regional Planning Council, with regard to compliance of the proposed project with the Town of Inglis Comprehensive Plan and Land Development Code. Such compliance is not relevant to this proceeding. At any rate, Ms. Sloan conceded that any prohibition that might apply in the Land Development Code to construction of the proposed facility could potentially be alleviated by exemption or variance provisions in the Code. MSSW PERMIT CRITERIA The project will provide adequate flood protection and drainage in the conventional sense. See Rule 40D-4.301(1)(a), Florida Administrative Code. Because the amount of impervious area is minimal, runoff from the project will not in any way contribute to increased flooding or adversely impact drainage patterns. The total amount of impervious area of the facility is less than that of a single-family residence. SWFWMD rules do not even require MSSW permits for single-family residences because the impact is not significant. The only purpose for requiring a MSSW permit for the project is to review the project’s potential downstream impacts to the watershed, not stormwater runoff from the facility itself. The project will not cause adverse water quality or water quantity impacts on adjacent lands in violation of Chapter 373, Florida Statutes, or cause a discharge that violates state water quality standards. See Rule 40 D-4.301(1)(b), Florida Administrative Code. As indicated by the WRM water quality findings above, the project will not generally violate state surface water quality standards. See Rule 40 D-4.301(1)( c), Florida Administrative Code. The project will not generally cause adverse impact on surface or groundwater levels or flows. See Rule 40 D- 4.301(1)(d), Florida Administrative Code. Since the project is a run-of-the-river, it will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it under Chapter 40D-8, Florida Administrative Code. The project will not cause adverse environmental impacts, or adverse impacts to wetlands, fish, and wildlife or other natural resources. The project can be effectively operated and maintained. See Rule 40D-4.301(1)(g), Florida Administrative Code. The project is a slow speed, low maintenance facility. The design concept is well established and has been successfully used for many years. Possible adverse affects to public safety are discussed below. The project is consistent with the requirements of other public agencies. See Rule 40D-4.301(1)(i), Florida Administrative Code. Potential harm to water resources within the SWFWMD are discussed below. See Rule 40D-4.301(1)(j), Florida Administrative Code. The proposed project generally will not interfere with the legal rights of others. See Rule 40D-4.301(1)(k), Florida Administrative Code. The proposed project is not against public policy. See Rule 40D-4.301(1)(l), Florida Administrative Code. The project complies with the requirements contained in the Basis of Review. See Rule 40D-4.301(2), Florida Administrative Code. There is a dispute as to whether the project was within or at the edge of the 100-year flood plain. This dispute is related to how one interprets the rule as it relates to the millrace and the location of the facility which is under ground. In the conventional sense, the project is not in the flood plain. Further, the project is designed in such a way, that it is waterproof if it were topped with water. While in the past SWFWMD may have had concerns that the project might cause downstream flooding, SWFWMD currently has no such concerns, given the run-of-the-river status of the proposed project. The operation of the project will not cause downstream flooding. The DEP included in its intent to issue, conditions contained in the sublease between Hy Power and the DEP in order to ensure that the facility would remain run-of-the-river, would comply with the water control plan, and would otherwise comply with the terms of the sublease. The DEP has final control over water flow and can revoke the permit or otherwise take enforcement action against Hy Power if Hy Power fails to comply with the water control plan. GROUNDWATER IMPACTS Operation of the project will not cause groundwater contamination or otherwise have adverse groundwater impacts. Some concerns about groundwater during excavation of the construction site were raised. The conflicting evidence received regarding them is discussed below. An area of concern was the de-watering plan for the project. Everyone agrees there will be some water seepage into the construction site that will have to be pumped out. The parties disagree regarding the amount of water that will have to be removed. Their estimates of amount of water to be removed vary because their estimates of size and over-all depth of the site vary. Petitioners presented credible evidence that a potential exists for the construction site to have a large quantity of water because of its location between two sources of surface water (the By-Pass Channel and Barge Canal), because of the makeup of the subsurface, and because of the depth of the construction. Hy Power credibly represents that if excessive groundwater is found, it can address the adverse impacts through its de-watering plan that would have to be filed with FERC and DEP. The technology exists to address the de-watering of the project. Such plans are routinely considered by DEP after a construction permit is issued and before de-watering occurs. There is very little evidence of sinkhole activity in the project area, and the construction activities are not expected to cause any sinkhole activity. NOISE POLLUTION Mr. Bitter expressed concerns that FERC would require the facility to install a very loud siren that would result in sudden noise adverse to the well-being of neighbors. Mr. Bitter is unfamiliar with FERC siren requirements at run-of the-river hydroelectric facilities. In contrast, Mr. Volkin, who has substantial experience in this area, testified that the only alarm device that would be required would be for the protection of the workers during construction. The purpose of the alarm is to warn persons below a dam spillway of a change in the volume of water being let out of the impoundment. In the case of a run-of-the-river facility, the volume is near constant, changing only gradually. Therefore, even if a warning siren had to be installed its use would be limited to significant changes in flow or testing. This would not constitute a nuisance. Further, the facility is located in the vicinity of the Crystal River Nuclear Power Plant which has its own warning sirens. It would be prudent to make any warning devices required for this structure significantly different from those at the nuclear plant and to limit their use. DAM SAFETY AND FERC REVIEW In reviewing whether Hy Power’s applications complied with the relevant permitting criteria, the DEP took into consideration the review of the facility already performed by FERC. FERC will also be responsible for reviewing the project as it is being constructed. Mr. Edwards also raised concerns about the structural stability of the By-Pass Dam itself. This has been a subject of concern by those responsible for the dam, and a survey of the structure was conducted in 1993, referred to as the Greiner Report. The Greiner Report identified specific maintenance problems that have been and are being addressed by the DEP. However, DEP’s maintenance plan does not address specifically the possibility that the weight of the dam over time has caused some shifting in the dam. Hy Power has only a few core borings and only one at the location of the generator. Hy Power is using the ACOE’s original borings, as confirmed by several new ones, to develop its preliminary plans. The DEP considered FERC and the ACOE as responsible agencies for determining the structural integrity of the dam. DEP has taken FERC’s review of this facility into consideration as part of DEP’s own permitting review. It is normal for DEP to rely on outside sources and agencies for assistance in determining compliance with DEP permitting criteria such as public health and safety, and it is reasonable for DEP to do so in this instance. Most states do not have the full capability to evaluate dam safety, and so they rely on FERC and ACOE. On April 21, 1997, the project received a conduit exemption from FERC. The application process is illustrated in Hy Power Exhibit 11. Hy Power submitted to DEP detailed information about the dam, the associated structures and the proposed project which had been reviewed by FERC and the ACOE, the two agencies in the United States who are responsible for dam structure design, control, and administration. Included in the package was the Greiner Report and Hy Power’s review of it. FERC evaluated the project, the Inglis By-Pass Dam structure, and the proximity of the project to the Dam in relation to structural impact, upstream and downstream impacts, water quality, and environmental issues. Mr. Edwards raised concerns regarding the ability of the limestone bedrock to sustain additional construction in the area of proposed construction. This is a material issue in the controversy which impacts several aspects of the proposed construction. Mr. Edwards pointed out that the barge canal channel was constructed with the use of explosives that caused a fracturing of limestone bedrock. He pointed out that the steel panels, which Hy Power proposes to drive into the bedrock to construct the water retention structure necessary to excavate the hole into which the turbine and powerhouse would be placed, will further fracture this bedrock. This creates two potential dangers. It could permit water to move under and around the bottoms of the panels, potentially scouring the loosened material from the base of the panels and making them unstable and subject to failure. It could weaken the entire southern wing of the existing spillway dam. Mr. Edwards opined that this could result in catastrophic failure of the dam or the coffer dam. Such a failure would cause major destruction and loss of life to those persons living and working in and along the lower Withlacoochee River. Hy Power presented rebuttal evidence that it could and would, if necessary, inject concrete into the limestone to stabilize it and avoid the concerns raised by Mr. Edwards. FERC specifically evaluated concerns raised by project opponents over the poor physical condition of the By-Pass Channel Spillway structures, relying particularly on the 1993 Greiner Report. FERC noted that the DEP had entered into a contract to correct any deficiencies listed in the Greiner Report, which "did not conclude that the deficiencies at the By-Pass Spillway threaten downstream life and property." The FERC review concluded that the dam was safe. To ensure safety, FERC is requiring that Hy Power do a complete stability analysis of the dam prior to any construction. Articles 301 and 302 of the FERC exemption ensure that all final drawings and specifications be submitted to FERC prior to construction, along with a supporting design report consistent with FERC’s Engineering Guidelines; that FERC can require changes to assure a safe and adequate project; and that Hy Power must also submit approved coffer dam construction drawings and specifications at least 30 days prior to starting construction. FERC has its own engineering staff who will go to the site and do their own analysis, along with the ACOE, of the dam and structures, prior to any construction commencing. This is a detailed design review evaluation so that the latest information on the dam will be made known immediately prior to construction, and will prevent any catastrophic event from happening. Under FERC procedures, FERC requires the applicant to obtain the DEP permits prior to requiring applicant to submit more detailed construction designs for FERC's consideration. These more detailed designs in turn will be subject to further review by DEP and FERC. It is assumed that Hy Power will comply with the post- permitting procedures and requirements, and will present complete, detailed construction drawings for FREC and DEP approval. Hy Power’s failure to complete the process would result in denial of a construction permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the DEP enter a Final Order that issues the two permits challenged in this proceedings, WRM Permit No. 38-237096-3.001 and MSSW Permit No. 38-0129249-002, subject to the conditions contained in the Intents to Issue in the respective WRM and MSSW Permits and as described in the Recommended Order. DONE AND ENTERED this 2nd day of March, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2000. COPIES FURNISHED: Daniel H. Thompson, Esquire Berger Davis & Singerman 215 South Monroe Street, Suite 705 Tallahassee, Florida 32301 Andrew Zodrow, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John S. Clardy, III, Esquire Crider Law Firm Plantation Point 521 West Fort Island Trail, Suite A Crystal River, Florida 34429 Teri Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bernard M. Campbell Bessie H. Campbell 245 Palm Street Post Office Box 159 Inglis, Florida 34449 Sarah E. Berger Post Office Box 83 Inglis, Florida 34449

Florida Laws (6) 120.5720.255267.061373.026373.414471.025 Florida Administrative Code (6) 40D -4.30140D-4.09140D-4.30161G15-27.00162-4.08062-4.242
# 7
ARTHUR R. KNUST vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 76-001649 (1976)
Division of Administrative Hearings, Florida Number: 76-001649 Latest Update: Dec. 19, 1977

The Issue This case involves a dispute between the Petitioner, Arthur Knust, and the Respondent, State of Florida, Department of Environmental Regulation, concerning a canal the Petitioner excavated in a subdivision of Martha Estates, Highlands County, Florida, which was connected to the waters of Lake Charlotte without obtaining permits. At the close of the hearing, the parties were invited to submit post-hearing memoranda which have been considered by me in preparation of this recommended order. Based thereon, and the entire record compiled herein, I make the following:

Findings Of Fact Petitioner is the owner of a parcel of land located in Highlands County, bordering on Lake Charlotte, a navigable body of water of the State of Florida. Petitioner has developed several waterfront lots in his uplands by excavating a series of canals off Lake Charlotte. Before the last canal in this series was completed, Petitioner was notified by Respondent's chief chemist and expert witness, Don Sessions, concluded that the water within the subject canal was a source of pollution. He found further that from the basis of results obtained from the adjacent canal system, further water quality degradation would result as the canal ages. He recommended that a plug be installed at the mouth of the subject canal. On September 28, 1977, Respondent's regional biologist, Richard Cantrell, took bottom grab samples of macroinvertebrate organisms at four stations within the subject and adjoining canals and lake. The species diversity index computed therefrom indicated the existence of an extremely stressed biological community within the subject and adjoining canals, as compared to a relatively healthy community in the lake. (Respondent's Exhibit number 13). Based on his interpretation of data, the physical configuration of the canal and the heavy growth of aquatic vegetation existing therein, he predicted an increase in concentration of toxic substantives in the canal due to a lack of circulation. He further predicted the diffusion of such substantives toward lower concentration within the lake. Finally, to reduce mass loading into the lake, he recommended that a plug be installed at the mouth of the canal. Petitioner's contention that Respondent had not conducted water samples of Lake Charlotte until the plug in dispute here was removed and therefore was unable to determine with any certainty, what effects the canal waters had on the water quality in Lake Charlotte was considered. However apart from the fact that the evidence herein clearly show that the water quality of Lake Charlotte was greater than that of the canals and that as time passes the water quality of Lake Charlotte would worsen due to diffusion from the canal waters, Respondent had the burden of showing that by removing the plug no violations of water quality standards would result in both the short and long term. Chapter 17-3 and 17-4.28, F.A.C. This it failed to do.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby recommended: Petitioner install, utilizing methods approved by the Department of Environmental Regulation, a good and sufficient plug at the location of the original plug to isolate the waters of the subject canal from the waters of the main canal and Lake Charlotte. Petitioner reimburse the Department of Environmental Regulation for expenses incurred in its investigation in the amount of Nine Hundred Twenty- Eight Dollars and Twelve Cents ($928.12) based on an itemized account of its expenses which was submitted following the close of the hearing. (Chapter 403.141(1), F.S.). RECOMMENDED this 2nd day of November, 1977, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675

Florida Laws (5) 120.57403.021403.031403.087403.141
# 8
WIREGRASS RANCH, INC. vs SADDLEBROOK RESORT, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 91-003658 (1991)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 12, 1991 Number: 91-003658 Latest Update: Oct. 29, 1993

Findings Of Fact The Parties and the Property. The Respondent, Saddlebrook Resorts, Inc. (Saddlebrook), is a corporation organized and existing under the laws of Florida, and is wholly owned by the Dempsey family. Saddlebrook is located on approximately 480 acres in central Pasco County, east of I-75 and south of State Road 54. The Petitioner, Wiregrass Ranch, Inc. (Wiregrass) is a corporation organized and existing under the laws of Florida, and is wholly owned by the Porter family ("the Porters"). Wiregrass owns approximately 5,000 acres of property which extends from Saddlebrook west approximately one mile to State Road 581 and south for approximately four miles. The Respondent, the Southwest Florida Water Management District (SWFWMD), is a political subdivision created pursuant to Chapter 61-691, Laws of Florida, which exists and operates under the Water Resources Act, Fla. Stat., Ch. 373. SWFWMD is charged with regulating, among other things, surface water management systems in Pasco County. Saddlebrook discharges surface water onto Wiregrass at two locations on the southern and western boundaries of Saddlebrook, known as the south outfall and the west outfall. Saddlebrook's property is part of a drainage basin totalling approximately 1400 acres that contributes runoff to Wiregrass' property. Until approximately 1973, the Saddlebrook property was undeveloped and owned by the Porters. In approximately 1973, the Porters sold the Saddlebrook property to the Refram family, which began developing the property. In approximately 1979, Saddlebrook acquired the property from the Reframs. The Saddlebrook property includes residential development, a conference center, and golf course and tennis facilities. Wiregrass' property, which is largely undeveloped and used for ranching, consists of pine-palmetto flatwoods, wetland strands, isolated wetlands, and improved pastures. The Porters' Civil Action Against Saddlebrook. The Porters instituted a civil action against Saddlebrook, Porter, et al. v. Saddlebrook Resorts, Inc., Case No. CA 83-1860, in the Circuit Court of the Sixth Judicial District, Pasco County, complaining that post-development discharges from Saddlebrook exceed pre-development discharges. In the civil litigation, the Porters contended that Saddlebrook's peak flow discharges should be returned to pre-development, or 1973, levels. A primary purpose of Saddlebrook's proposed redesign is to return peak flow discharges to those levels that existed in 1973, in response to the Porters' complaints in the civil action. Saddlebrook's current surface water management system is deemed by SWFWMD to be in compliance with Rule 40D-4, and SWFWMD's regulations do not require redesign or modification of the current system. Prior to Saddlebrook's submission of its application, SWFWMD advised Saddlebrook that, because Rule 40D-4 became effective on October 1, 1984, SWFWMD considered that date to be the "pre-development" condition for purposes of evaluating Saddlebrook's discharges. Saddlebrook requested that SWFWMD evaluate its application using 1973 as the pre-development condition. SWFWMD advised Saddlebrook that it would apply 1973 as the pre-development condition if the Porters consented. By letter from the Porters' counsel to SWFWMD dated January 31, 1990, the Porters provided their express consent to SWFWMD's use of 1973 as the pre- development date for purposes of evaluating those discharges relevant to Saddlebrook's MSSW permit application. Saddlebrook's MSSW Permit Application. On or about February 8, 1990, Saddlebrook submitted its application for MSSW permit no. 497318.00, seeking SWFWMD's conceptual approval of the redesign of Saddlebrook's surface water management system. The proposed redesign calls for modification of most of the existing drainage control structures at Saddlebrook and installation of new control structures at several locations, including the south and west outfalls. After submission of its initial application, Saddlebrook made various subsequent submittals in response to SWFWMD requests for additional information. Saddlebrook's response to SWFWMD's requests culminated in final submittals on March 7, 1991 and April 5, 1991. In its various submittals, Saddlebrook provided, among other things, detailed descriptions of all proposed modifications to its drainage system, engineering reports, and computerized flood-routing analyses of runoff from Saddlebrook under pre-development (1973) and post-modification conditions. Saddlebrook provided all information requested, and SWFWMD thereafter deemed its application complete. SWFWMD's Review of Saddlebrook's Application. In the fifteen months following Saddlwbrook's initial February, 1990, submittal, SWFWMD conducted an intensive review of the application. During the course of this review, SWFWMD staff performed numerous field inspections, made an independent determination of all input data to the computer analyses of Saddlebrook's discharges, and made six separate formal requests for additional information. SWFWMD's requests for additional information required, among other things, that Saddlebrook modify various input data and rerun its computer analyses of discharges under the pre-development and post-modification conditions. In addition, SWFWMD required Saddlebrook to perform computer modelling analyses of discharges from Wiregrass' property onto the property of downstream landowners. Because, unlike the Porters, these downstream owners had not provided consent to use 1973 as the relevant pre-development date, SWFWMD required Saddlebrook to model this downstream discharge using a "pre- development" date of 1984. SWFWMD performed its standard review procedures in connection with Saddlebrooks' application. In addition, SWFWMD also performed its own computer-modelling analyses of Saddlebrook's discharges. This modelling was based on input data independently collected by SWFWMD staff in the field and from other sources. SWFWMD staff also met with the Porters' hydrologist, Dr. Gerald Seaburn, and thoroughly reviewed concerns he expressed in connection with Saddlebrook's application. In addressing these concerns, SWFWMD performed additional work, including conferring with an independent soils expert, performing additional field inspections, and modifying the SWFWMD computer modelling analyses based on alternative input parameters suggested by Dr. Seaburn. In reviewing Saddlebrook's application, SWFWMD applied the design and performance criteria set forth in its "Basis of Review for Surface Water Management Permit Applications" ("Basis of Review"), which is incorporated by reference in F.A.C. Rule Chapter 40D-4. Based upon its review of Saddlebrook's application, SWFWMD concluded that Saddlebrook had demonstrated compliance with the design and performance criteria set forth in SWFWMD's Basis of Review and the conditions for permit issuance under F.A.C. Rule 40D-4.301. By a Staff Report dated April 29, 1991, and Notice of Proposed Agency Action dated May 3, 1991, SWFWMD recommended approval of Saddlebrook's application. Compliance With SWFWMD Permitting Criteria. The design and performance criteria for MSSW permitting set forth in SWFWMD's Basis of Review fall into four categories: (1) water quantity, in terms of peak flow discharges for projects, like Saddlebrook's, located in open drainage basins; (2) flood protection; (3) water quality; and (4) wetlands impacts. Water Quantity. Under the Basis of Review's water quantity standards, SWFWMD requires that projected peak flow discharges during a 25-year, 24-hour storm event under the proposed system be reasonably similar to peak flow discharges under the pre- development condition. The evidence presented at the formal hearing demonstrated that Saddlebrook's application satisfies SWFWMD's water-quantity standards. This evidence demonstrated that peak flow discharges during a 25-year, 24-hour storm event under the proposed system will be less than, but reasonably similar to, pre-development (1973) peak flow discharges. The evidence presented at the formal hearing also demonstrated that, under the proposed system, peak flow discharges during a 25-year, 24-hour storm event from Wiregrass' property onto downstream landowners will be less than, but reasonably similar to, 1984 peak flow discharges. The evidence presented by Saddlebrook further demonstrated that storage will be increased under the proposed redesign versus the pre- development, 1973 condition. On Saddlebrook's property, there will be approximately 35 percent more storage than existed in 1973, and the total storage for Saddlebrook and the contributing drainage basin upstream of Saddlebrook will be increased by approximately 15 percent over that existing in 1973. Flood Protection. Under the flood-protection standards of the Basis of Review, SWFWMD requires that the applicant demonstrate that under the proposed condition the lower floor of all residential and other buildings on-site, and in areas affected by the site, will be above the 100-year flood elevation. SWFWMD also requires that there be no net encroachment into the flood plain, up to that encompassed by the 100-year event, which will adversely affect conveyance, storage, water quality or adjacent lands. The evidence presented at the formal hearing demonstrated that Saddlebrook's application satisfies SWFWMD's flood-protection standards. The testimony of Mr. Fuxan and Wiregrass' related exhibit, Ranch Ex. 35, purporting to show that in a 25-year, 24-hour storm Saddlebrook's proposed redesign will "flood the [Saddlebrook perimeter] roads and just sheet flow onto the Porter property" is not accurate. As part of its redesign, Saddlebrook will construct an additional berm along the southwestern and southern perimeters of its property. This berm will detain water on Saddlebrook's property during a 25-year, 24-hour storm event and prevent it from "sheet-flowing" onto the Wiregrass property. Water Quality. Under the water-quality standards of the Basis of Review, SWFWMD requires, for systems like Saddlebrook's involving wet detention and isolated wetlands, that the applicant provide sufficient storage to treat one inch of runoff from the basins contributing runoff to the site. This volume must be discharged in no less than 120 hours, with no more than one-half of the volume being discharged within the first 60 hours. The evidence presented at the formal hearing demonstrated that Saddlebrook's application satisfies SWFWMD's water-quality standards. Wetland Impacts. Under the wetland-impacts standards of the Basis of Review, SWFWMD requires that the applicant provide reasonable assurance that the proposed system will not adversely impact on-site and downstream wetlands. The evidence presented at the formal hearing demonstrated that Saddlebrook has provided reasonable assurance that the proposed redesign will cause no adverse impacts to on-site wetlands. Saddlebrook's proposed redesign will impact only approximately .167 acres of on-site wetlands, for which Saddlebrook will fully mitigate by creating .174 acres of forested wetlands and buffer area. The evidence presented at the formal hearing also demonstrated that Saddlebrook has provided reasonable assurance that the proposed redesign will cause no adverse impacts to off-site wetlands. Reasonable assurance that off- site wetlands will not be adversely impacted was demonstrated by, among other things, evidence establishing that: (1) discharge points will not change under the proposed condition; (2) discharge elevations will be reasonably similar under the proposed condition; (3) there will be no significant variation in the water fluctuations in the wetlands adjacent to the south and west outfalls as a result of the proposed condition; (4) the drainage basin areas will be reasonably similar under the proposed condition; and (5) the proposed redesign will satisfy SWFWMD's water quality requirements. Wiregrass' Petition. In its Petition for Formal Administrative Hearing, Wiregrass focused primarily on water quality issues and stormwater runoff rates (or peak flow discharges), alleging the following "ultimate facts" which it claimed "entitle [it] to relief": The application, as submitted, contains insufficient storage to meet water quality criteria. The application, as submitted, will result in storage volumes on the project site which will not be recovered within 72 hours [sic] as required by the DISTRICT criteria. The application, as submitted, contains calculations based on erroneous hydraulic gradients. The application, as submitted, will result in storage volumes insufficient to meet water quality criteria as required by DISTRICT criteria. Post development stormwater runoff rates are underestimated in the application, resulting in system design with insufficient retention storage capacity to meet the DISTRICT's water quantity criteria. The failure to store stormwater or irrigation runoff impacts the substantial interest of the RANCH in that it deprives it of groundwater resources necessary for the successful operation of the ranch. Further, the lack of storage of stormwater and irrigation water is a prohibited waste of the water resources. At the formal hearing, Wiregrass presented no evidence to support any of the foregoing allegations of its Petition. Objections Raised by Wiregrass At The Hearing. At the final hearing, Wiregrass' opposition to Saddlebrook's permit application focused on three different grounds: For purposes of evaluating peak flow discharges, SWFWMD does not have jurisdiction to use a pre-development date prior to October 1, 1984. Under F.A.C. Rule 40D-4.301(1)(i), which provides that an applicant must give reasonable assurance that the surface water management systems "is consistent with the requirements of other public agencies," SWFWMD must apply not only its own permitting criteria but also those of other governmental entities, including county planning ordinan Under F.A.C. Rule 40D-4.301(1)(b), which provides that a permit application must give reasonable assurances that the surface water management system "will not cause adverse water . . . quantity impacts", SWFWMD must consider whether the annual volume of runoff will increase as a result of the proposed surface water management system. None of the foregoing objections was raised in Wiregrass' Petition as a basis for denying Saddlebrook's application. (Annual volume was alluded to in the Petition only as being pertinent to the question of Wiregrass' "substantial interest" for purposes of standing.) In any event, for the reasons set forth below, each of these objections was refuted by the evidence presented at the formal hearing. The 1973 Pre-Development Date. In their civil action against Saddlebrook, the Porters took the position that Saddlebrook's surface water management system should be redesigned so that discharges approximate those levels existing in 1973, before development of the Saddlebrook property. Dr. Gerald Seaburn, a hydrologist retained by the Porters, testified in the civil action that 1973 is the appropriate pre-development date for purposes of evaluating Saddlebrook's peak flow discharges. David Fuxan, a civil engineer retained by the Porters, took the position in the civil action that Saddlebrook should modify its surface water management system so as to return peak flow discharges to 1973 levels. At the formal hearing in this proceeding, Mr. Fuxan testified that it is still his position that Saddlebrook should modify its surface water management system so as to return peak flow discharges to 1973 levels. By letter from the Porters' counsel to SWFWMD dated January 31, 1990, the Porters provided their express consent to SWFWMD's use of 1973 as the pre- development date for evaluating those discharges relevant to Saddlebrook's MSSW permit application. Use of a 1984 "pre-development" date would prevent Saddlebrook from making the modifications the Porters claim in the civil litigation that it must make. Saddlebrook's existing system, about which the Porters complain in the civil litigation, is in all material respects the same system that was in place on October 1, 1984. Use of this existing system as the benchmark of comparison for attenuation of peak flows, therefore, would mean that substantial modifications to the existing system could not be made without substantially increasing retention storage on Saddlebrook. Substantially increasing retention storage on Saddlebrook is not possible due to the high water table and proximity of the lower aquifer. See Finding of Fact 70, below. In addition, a primary claim of the Porters in the civil action is that duration of flow under Saddlebrook's existing system exceeds 1973 levels and has resulted in expanded wetlands on the Porter property. But duration of flow and peak flow discharges are inversely related: duration of flow can be decreased only if peak flow discharges are increased. Accordingly, the only way that Saddlebrook can reduce the duration of flow onto Wiregrass to 1973 levels, as the Porters have demanded, other than increasing retention storage on Saddlebrook, is to return peak flow discharges to 1973 levels. Other Governmental Agencies' Requirements. F.A.C. Rule 40D-4.301(1)(i) provides that a permit applicant must give reasonable assurance that the surface water management system "is consistent with the requirements of other public agencies." SWFWMD has consistently interpreted this provision to be "advisory", i.e., to apprise applicants that they must also comply with other applicable laws and that issuance of an MSSW permit by the District does not relieve them of the responsibility to obtain all necessary local and other permits. SWFWMD's long-standing and consistently-applied interpretation and practice is not to require applicants to prove compliance with the regulations of other govermental agencies in order to obtain an MSSW permit. There are two primary reasons for this interpretation and practice. First, the Southwest Florida Water Management District includes 16 counties and 96 municipalities. In addition, other state and various federal agencies have jurisdiction within its territory. It is impracticable for SWFWMD to become familiar with, and to apply, the permitting and other regulations of more than 100 other agencies. Second, SWFWMD has concluded that, under Part 4 of Secton 373 of the Flordia Statutes, it does not have authority to deny a permit application based on its interpretation of another governmental agency's regulations. In any event, the evidence demonstrates that Saddlebrook has provided reasonable assurance that the proposed redesign will be "consistent with the requirements of other public agencies" as provided in F.A.C. Rule 40D- 4.301(1)(i). Limiting Condition No. 3 of the proposed permit requires that Saddlebrook must comply with Pasco County and other local requirements: The Permittee shall comply with all applicable local subdivision regulations and other local requirements. In addition the permittee shall obtain all necessary Federal, State, local and special district authorizations prior to the start of any construction or alteration of works authorized by this permit. In addition, Standard Condition No.3 ensures that SWFWMD approval will not supersede any separate permitting or other requirements imposed by Pasco County: The issuance of this permit does not . . . authorize any . . . infringement of federal, state or local laws or regulations. (Emphasis added.) Finally, the Pasco County ordinance upon which Wiregrass relies imposes requirements that are in substance identical to SWFWMD's with respect to MSSW permit applications. Saddlebrook's compliance with SWFWMD's regulations likewise would satisfy the substance of the requirements of the county ordinance. Annual Volume of Runoff. F.A.C. Rule 40D-4 (incorporating the Basis of Review) does not address, and SWFWMD does not regulate, the annual volume of runoff in open drainage basins. If annual volume of runoff is relevant under Rule 40D-4.301, as Wiregrass contends, that rule requires only that the applicant provide reasonable assurance that "the surface water management system" will not cause adverse quantity impacts. Saddlebrook's existing surface water management system has not caused a significant increase in the annual volume of runoff onto Wiregrass' property. The increase in the annual volume of runoff from Saddlebrook that has occurred over the pre-development 1973 condition has resulted from the urbanization of Saddlebrook's property. The increase in the annual volume of runoff from Saddlebrook over that existing prior to development (1973) is approximately 3.4 inches. This increase is only a small fraction of the natural year-to-year variation in runoff resulting from differences in rainfall alone. Rainfall can vary up to 30 inches on an annual basis, from 40 to 70 inches per year. The resulting year-to-year variations in runoff can total as much as 20 inches. The approximately 3.4 inches increase in the annual volume of runoff from Saddlebrook due to urbanization has caused no adverse impact to Wiregrass. The natural drainage system on the Wiregrass property has in the past and throughout its history received and handled increases in the annual volume of runoff of up to 20 inches due to rainfall differences. Such increases simply flow through Wiregrass' property. Of the approximately 3.4 inch increase in annual runoff due to urbanization, only approximately one-third of an inch is due to the filling in of bayheads by Saddlebrook's prior owner. This increase is insignificant and has not caused a substantial adverse impact to Wiregrass. Any reduction of storage resulting from the filling of bayheads will be more than compensated for under the proposed redesign. Storage on Saddlebrook's property will be increased by approximately 35 percent under the proposed condition over that existing in 1973, before the bayheads were filled. In open drainage basins, like Saddlebrook's, downstream flooding is a function of the rate of peak flow of discharge, not the annual volume of runoff. This is one of the reasons why, in the case of open drainage basins, SWFWMD regulates peak flow discharges and not the annual volume of runoff. Because Saddlebrook's proposed redesign will attenuate peak flow discharges to those levels that existed in the pre-devlopment 1973 condition, Saddlebrook has provided reasonable assurance that there will not be increased flooding on Wiregrass' property in the future. The evidence does not establish that Wiregrass has suffered, or will suffer, any adverse impact due to an increase in the annual volume of runoff from Saddlebrook as a result of the design, or redesign, of the system, or as a result of urbanization, or otherwise. It is not possible to design a surface water management system at Saddlebrook that would reduce the annual volume of runoff. Such a system, which involves the percolation of surface water from retention ponds into a deeper, aquifer system, requires a deep water table. At Saddlebrook, the water table is near the ground surface. As a result, it is not possible to store a significant quantity of water in retention ponds between storm events. In addition, the water levels in the deeper and the shallower aquifer systems at Saddlebrook are approximately the same and, therefore, there is insufficient hydraulic pressure to push the water through the confining layer between the two systems and into the deeper aquifer system.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Southwest Florida Water Management District enter a final order granting Saddlebrook's application for surface water management permit no. 497318.00, subject to the terms and conditions in the SWFWMD Staff Report. RECOMMENDED this 31st day of March, 1992, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 1992. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-3658 To comply with the requirements of Section 120.59(2), Fla. Stat. (1991), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. 1.-4. Accepted and incorporated. Rejected as not proven and contrary to the greater weight of the evidence. Accepted and incorporated to the extent not subordinate or unnecessary. 7.-9. Rejected as not proven and contrary to the greater weight of the evidence. First sentence, accepted. Second sentence, rejected as not proven and contrary to the greater weight of the evidence. Accepted but not necessary. 12.-13. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but not necessary. The extent of the wetland expansion is rejected as not proven and contrary to the greater weight of the evidence. The rest is accepted. However, the increased volume is due in large part to urbanization, not to the surface water management system. It also is due in part to alterations to the property done by the Porters. Accepted but subordinate and unnecessary. Accepted. However, this would occur only during a 25-year, 24-hour storm event, and there was no evidence that one has occurred or, if it has, whether Mr. Porter was there to observe it. 18.-20. Accepted but subordinate and unnecessary. Characterization "much of" is rejected as not proven and contrary to the greater weight of the evidence. Otherwise, accepted but subordinate and unnecessary. Accepted and incorporated. Rejected as not proven and contrary to the greater weight of the evidence. Rejected as not proven and contrary to the greater weight of the evidence. Rejected as not proven and contrary to the greater weight of the evidence that lichen lines, by themselves, are ordinarily are sufficient to set jurisdictional lines. 26.-29. Rejected as not proven and contrary to the greater weight of the evidence. Even if it were proven that the wetlands had expanded, it was not proven, and is contrary to the greater weight of the evidence, that Saddlebrook (and, especially, Saddlebrook's surface water management system) caused the expansion. First sentence, accepted but cumulative. The rest is rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. In any event, both factors are undeniably significant. 32.-34. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. Rejected as not proven and contrary to the greater weight of the evidence. 39.-41. Rejected as not proven and contrary to the greater weight of the evidence that SWFWMD does not apply it. The evidence was that SWFWMD interprets it differently than Wiregrass proposes and applies its own interpretation. Under the SWFWMD interpretation, the permit conditions requiring compliance with other legal requirements constitute the necessary "reasonable assurance." In addition, SWFWMD's review and evaluation is not complete until this formal administrative proceeding is completed, and the Pasco County ordinance has been considered as part of this proceeding. Rejected as not proven and contrary to the greater weight of the evidence. Again, SWFWMD's review and evaluation is not complete until this formal administrative proceeding is completed, and annual volume has been considered as part of this proceeding. That consideration has affirmed SWFWMD's position that, at least in this case, the proposed stormwater management system does not cause an increase in annual volume that would result in denial of the application. Accepted but subordinate and unnecessary. Rejected as not proven and contrary to the greater weight of the evidence. First sentence, accepted (although the characterization "far exceed" is imprecise) and incorporated. Second sentence, rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary that no "stipulation" was entered into. But the evidence is clear that Wiregrass, Saddlebrook and SWFWMD all agreed to the use of 1973 as the point of comparison for peak flow discharges. Rejected as not proven and contrary to the greater weight of the evidence. Accepted but subordinate and unnecessary. Respondents' Proposed Findings of Fact. The proposed findings of fact contained in the Proposed Recommended Order of Respondents Saddlebrook Resorts, Inc., and Southwest Florida Water Management District are accepted and incorporated to the extent not subordinate or unnecessary. COPIES FURNISHED: Douglas P. Manson, Esquire Foley & Lardner 101 East Kennedy Boulevard Suite 3650 Tampa, Florida 33602 Stephen R. Patton, Esquire Jeffrey A. Hall, Esquire Kirkland & Ellis East Randolph Drive Chicago, Illinois 60601 Enola T. Brown, Esquire Lawson, McWhirter, Grandoff & Reeves East Kennedy Boulevard Suite 800 Post Office Box 3350 Tampa, Florida 33601-3350 Mark F. Lapp, Esquire Edward Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (2) 120.57373.413 Florida Administrative Code (5) 40D-4.02140D-4.04140D-4.05440D-4.09140D-4.301
# 9
SUWANNEE RIVER WATER MANAGEMENT DISTRICT vs WILLIAM BEDARD, 92-003654 (1992)
Division of Administrative Hearings, Florida Filed:Lake City, Florida Jun. 22, 1992 Number: 92-003654 Latest Update: Jan. 27, 1993

The Issue Whether the Respondent committed the acts alleged in the Administrative Complaint.

Findings Of Fact District is a governmental agency of the State of Florida created and empowered by Chapter 373, Florida Statutes, to regulate permitting and construction of water wells, and to regulate well contractors. William Bedard, Post Office Box 545, Branford, Florida 32208, is a water well contractor with license #2830. Bedard constructed a water well for Wendell Forsythe in Three Rivers Estate, Township 6 South, Range 15 East, Section 25 in Columbia County, Florida. This is within the District. Said well was a four inch water well. Said well was constructed sometime prior to July 11, 1991. Bedard applied for a permit from the District on July 11, 1991. District requested additional information from Bedard by telephone on July 11, 1991, and followed up with a letter which was mailed March 23, 1992. The additional information in the form of a survey was provided to the District on May 22, 1992. The District issued a permit for said water well on June 16, 1992, approximately 11 months after the well was drilled. Bedard had one previous violation for drilling a water well without a permit. He applied for and received an after-the-fact permit in that instance. In mitigation, Bedard offered the following facts: Wendell Forsythe (Forsythe) lives in South Florida and only comes to his property in Columbia County on weekends. Forsythe met with Bedard on the site to discuss the proposed well. Forsythe said he wanted to go forward, and Bedard advised Forsythe that he would begin on Monday after he obtained a permit from the District Office which was closed. Forsythe wanted to see the work done, and told Bedard that he would get another contractor if Bedard would not start the well right away. Bedard constructed the well and applied for a permit on the first working day after construction of said well. Before Bedard constructed the well, Forsythe told him that the site was not within the flood plain and a survey would not be required. The site was within the flood plain, and a topographic survey was required. The District asked Bedard for a survey. Bedard passed the request for the survey on to Forsythe, however, Forsythe did not provide this information until May of 1992 when he became aware that he might be liable. The District's attorney's fees and administrative costs were $970.00.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: A penalty be assessed against the Respondent in the amount of $275, and and Two and one half points be assessed against the Respondent's license, No attorneys fees or costs be assessed through this administrative hearing process. DONE and RECOMMENDED this 3rd day of November, 1992, at Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The De Soto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of November, 1992. COPIES FURNISHED: Janice F. Bessinger, Esquire 10 North Columbia Street Lake City, FL 32056-1029 William Bedard Post Office Box 545 Branford, FL 32208 Jerry Scarborough, Executive Director Suwannee River Water Management District Route 3 Box 64 Live Oak, FL 32060

Florida Laws (5) 120.57373.129373.313373.333373.59 Florida Administrative Code (2) 40B-3.03740B-3.041