Findings Of Fact At all times relevant hereto, respondent, James S. Stroz, held registered roofing contractor license number RC 0034849 issued by petitioner, Department of Professional Regulation, Florida Construction Industry Licensing Board. He was first licensed in November, 1979, and at that time qualified under the name of Stroz Roofing. A change in status application was later filed to qualify Stroz Roofing, Inc., 13696 Exotica Lane, West Palm Beach, Florida. Although licensed as a roofing contractor, respondent's firm only performs work on wood shakes or shingles. He does not do hot roofs or flat roofs, which is another speciality in the roofing business. While working for a roofing firm in1979, Stroz became acquainted with Lacy Davis, an unlicensed individual who specialized in flat roof work. When Stroz started his own roofing company in 1983, he began contracting out the flat roof work to other licensed roofing contractors. Lacy Davis learned of this and approached Stroz offering his services on the flat roof work. Stroz knew Davis was unlicensed and would not initially hire him, but Davis gave him a business card of Henry Haywood, a licensed roofing contractor in Palm Beach County and explained he and Haywood were partners and that the work and permitting would be done under Haywood's license. In actuality, Haywood had not authorized Davis to use his business cards, or topull permits under his name. Indeed, Haywood had no knowledge of Davis' activities. Without verifying the truth of Davis' representations, and accepting them instead at face value, Stroz agreed to hire Davis to perform his flat roof work. Between January 20, 1983 and September 30, 1984, Stroz performed some twenty-one jobs using Davis for the flat roof work. At all times, Stroz was under the impression that the work was being done under Haywood's license and that his activities were lawful. Stroz made all checks for the work payable to Lacy Davis or Lacy Davis Roofing. He did this because Davis told him he frequently had difficulty reaching Haywood to cash the checks, and because the business bank account was in Davis' own name. A few of the checks carried a notation at the bottom that payment was for work by Haywood Roofing, but most made no reference to Haywood. Stroz pulled all permits on their jobs reflecting that Haywood Roofing was the licensed contractor. Of the twenty invoices given by Davis to Stroz for the twenty-one jobs, only four were on invoices printed with Haywood's name. The remainder had various other names including "Lacy Davis Roofing," "Lacy Davis" and "Lacy Davis and Benny Guy Roofing Contractors." None of these were licensed as roofing contractors by petitioner. In June, 1984, a member of Davis' crew was injured and it was discovered Davis had no insurance. Stroz's insurance paid the claim, but an investigation ultimately determined that Davis was unlicensed and had no authority to act on Haywood's behalf. This led to the issuance of the administrative complaint herein. Respondent has fully cooperated with petitioner, and in fact voluntarily disclosed one job with Davis that petitioner's investigation had failed to uncover. He admits he was negligent in not checking out the representations of Davis, but he never intended to violate the law. No consumer was harmed in any way by Davis' work, and there are no complaints concerning the quality of the jobs in question.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent be found guilty as charged in the administrative complaint, and that he be fined $500 to be paid within thirty days from date of the final order rendered in this proceeding. DONE and ORDERED this 2nd day of July, 1985, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, FL 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of July, 1985.
The Issue Whether Respondent committed the offenses described in the Administrative Complaint? If so, what disciplinary action should be taken against him?
Findings Of Fact Respondent is a roofing contractor licensed to practice in the State of Florida. Since January, 1982, he has been the qualifying agent for Tropical Clima-Coat Inc. (Tropical). On September 21, 1983, Tropical entered into a written contract with Bertha Guerry and her husband Joseph, in which it agreed, for $2,449.10, to perform the following roofing work on the Guerrys' residence, which was located at 2185 S.W. 38th Street in Fort Lauderdale, Florida: Remove loose gravel and dirt from existing roof surface/flat deck. Apply Tropical Clima-Coat's resin- based cement to fill holes and cracks in the roof surface. Apply acrylic primer to provide maximum adhesion for acrylic waterproofing. Apply acrylic waterproofing, creating a uniform, bonded, elastomeric, watertight surface. Apply White Acrylic Roof Finish as a durable, mildew-resistant wear barrier. The contract further provided that the Guerrys were to receive a "5 year, 100% warranty against leaks." The work specified in the contract was completed on October 31, 1983, and the Guerrys thereupon paid Tropical in full. Tropical, in turn, gave the Guerrys a written warranty signed by its Vice-President, which provided, in part, as follows: If within 5 years after Tropical Clima- Coat applies its Roof System to your roof, a leak develops because of the failure of our roofing system,* we will repair it free. * Damage excluded from warranty: Tropical Clima-Coat shall not be liable for any leaks or damage caused by riots or vandalism, termites or other insects, penetration of the roof or waterproofing system by nails; nor shall Tropical Clima-Coat be liable for leaks or damage caused by acts of God, including but not limited to: lightening, gale, hurricane, tornado, hailstorm, flood, earthquake, or unusual phenomena of the elements; nor from damage to roof due to settlement, distortion, dry rot, failure or cracking of the roof deck, walls, partitions, or foundation of the structure; nor defects or failure of materials used as a roof base, over which our waterproofing system is applied; nor by biological growth, traffic upon the roof or any similar cause. The warranty also contained the following provision prescribing the time and manner in which claims under the warranty had to be made: The owner of the roof will notify Tropical Clima-Coat immediately by certified mail, at its main office (3746 N.W. 16th Street, Ft. Lauderdale, Florida 33311) of any leaks alleged to result from causes not excluded from coverage by this warranty. Such notification must be mailed within 30 days of discovery of the need for repairs, and all correspondence must include the above Certificate Number. In June, 1986, Mrs. Guerry noticed that there was a leak in her roof above the living room. She telephoned Tropical and requested that it repair the leak in accordance with the warranty she and her husband had been given. Tropical responded promptly to Mrs. Guerry's request. It sent one of its workers to the Guerry residence and he patched the leak. Arrangements were made for the worker to return to the Guerry residence and pressure clean the roof. Pursuant to these arrangements, the worker came back to the residence and pressure cleaned the roof as he had promised. It took him two hours to complete the task. Following the pressure cleaning of the roof, Mrs. Guerry discovered that there were now leaks in the roof above the kitchen. Having made this discovery, she again telephoned Tropical and requested that it repair these newly-discovered leaks. As it had done in response to her previous telephonic request, Tropical dispatched a worker to the Guerry residence, albeit not as promptly as on the prior occasion. The worker applied black ceramic granules to the surface of the roof in an attempt to alleviate the problem. The Guerrys now had a black roof instead of the white roof for which they had contracted. Mrs. Guerry again telephoned Tropical and complained about the new color of her roof. Tropical responded by having a worker go to the Guerry residence and spray paint the roof white. The paint, however, did not adhere well to the granular material on the roof. Furthermore, Mrs. Guerry observed new leaks in the roof. On September 8, 1986, she telephoned Tropical to advise it of these recent developments. Respondent visited the Guerry residence the next day. He told Mrs. Guerry that Tropical intended to remove the granules and recoat the roof with an asphalt material imbedded with a polyester fabric for greater strength to prevent against leaks. He further assured her that, upon completion of the repair work, the roof would be white. On September 15, 1986, a crew of Tropical workers were on the Guerrys' roof with approximately 80 to 100 gallons of asphalt when a sudden, unexpected heavy rainstorm interrupted their work. The rainwater mixed with the asphalt and created "black goo," some of which fell from the roof onto the sides of the house, the porch, the driveway, the sidewalks, the grass, the bushes, and the trees. Tropical had its workers endeavor to clean up the mess that the rainstorm had created. They used mineral spirits in an attempt to remove the hardened remains of the "black goo" from the porch, the driveway and the sidewalks and swept the residue onto the grass, bushes and trees. In so doing, they contaminated the soil and killed the vegetation. Respondent was responsible for the decision to use mineral spirits in the cleanup effort. He did not realize, as he should have, that the use of this substance would result in environmental damage. The cleanup progressed slowly. Frustrated by the lack of substantial progress, Mrs. Guerry telephoned Respondent and demanded that he go to her home and do something about the situation. Respondent did not believe that his presence at the home would help matters any and he told Mrs. Guerry so. Nonetheless, on September 17, 1986, he paid his final visit to the Guerry residence. During his visit, Respondent met with Mrs. Guerry for approximately an hour and a half. Mrs. Guerry expressed to Respondent her outrage concerning the situation. Respondent recognized that Mrs. Guerry had a right to be annoyed and that Tropical needed to take action to remedy her plight. He wrote down on a piece of paper the following things that Tropical would do for the Guerrys: FIX ROOF LOOSEN SOIL W/RAKE 4. REMOVE "STICKINESS" FROM DRIVEWAY AND SIDEWALK 3. REMOVE BLACK FROM CHATTAHOOCHEE (STAINS WILL REMAIN) REMOVE "STICKINESS" FROM CHATTAHOOCHEE REMOVE STICKINESS FROM DECORATIVE WALL (STAINS WILL REMAIN) REMOVE STICKINESS FROM SIDEWALKING STONES REMOVE BLACK FROM CHAT @ BACK DOOR SOD- TO BE DETERMINED LATER Respondent indicated he would sign this document and he asked Mrs. Guerry to do the same to acknowledge their understanding and agreement as to the remedial action Tropical was to take. Mrs. Guerry refused. Nonetheless, the cleanup effort continued. Mrs. Guerry, however, did not permit Tropical to continue its repair work on the roof. Concerned about the damage that had been done to the vegetation on her property, Mrs. Guerry contacted a horticultural consultant, Robert G. Haelhle. Haelhle surveyed the property on September 18, 1986. Following his survey he wrote a letter to the Guerrys advising them of the following: On September 18, 1986, I visited the Guerry property at Mrs. Guerry's request. The landscape plantings are in real trouble due to a mineral spirits spill. Mineral spirits and water were used to clean up roofing tar that washed off the roof after a heavy rainstorm. The kerosene [sic] and water mixture washed over the lawn, around the base of a West Indian Cherry tree (very rare), an arborvitae, and a 165 foot Ixora hedge on the east and west sides of the house. The Ixora hedge is over 7 feet tall and 30 years old and would not be replaceable. The mineral spirits/water mix will poison the soil and eventually could affect the water table. All affected soil will have to be removed from the area before any new planting can be accomplished. The West Indian Cherry was starting to yellow and the grass was dying at the time of my visit. Time is of the essence to preserve the remaining plantings. The kerosene [sic]/water mix poisons the root system of the plants and does not allow for normal water penetration. I am not optimistic about the remaining plantings. I contacted Jane McCarthy of the Environmental Quality Board, tel: 765- 5881. She was to send an inspector to assess the soil damage at the site. Neither Tropical nor Respondent replaced the "plantings" that had been damaged or destroyed as a result of the cleanup effort. On September 22, 1989, Mrs. Guerry telephoned Respondent. She reiterated that she did not want any work done on the roof until she had an independent expert inspect it and provide her with guidance. That same day, Edward T. Weiner, a licensed architect hired by the Guerrys, inspected their roof. Based on his observations of the condition of the roof, it was Weiner's opinion that the repair work done by Tropical was unacceptable and that a new roof needed to be installed. He so advised the Guerrys by letter dated September 29, 1986. The Guerrys also hired an attorney, Craig W. Lekach, to furnish them legal advice and representation concerning their dealings with Tropical. On September 23, 1986, Lekach telephoned Respondent and instructed him to "get busy" with the repair work that needed to be done. The following day, Respondent telephoned Mrs. Guerry and told her that he was anxious to complete the repair work on her roof. Mrs. Guerry took the opportunity to again express her displeasure with the work Tropical had done. She also indicated that she had yet to hear from Weiner regarding his assessment of the condition of the roof. That same day, September 24, 1986, Respondent received word that a Broward County Environmental Compliance Officer had inspected the Guerrys' property and determined that mineral spirits used in the cleanup effort had contaminated soil on the property. Respondent was further informed that the excavation of the contaminated soil would remedy the situation. Having received permission from the Guerrys' attorney to proceed with the repair work, Respondent sent a crew to the Guerry residence on September 25, 1986, to vent the roof. Mrs. Guerry, however, did not allow the workers to install the vents. Another telephone conversation between Mrs. Guerry and Respondent ensued. Respondent reiterated that it was his desire to finish the work that needed to be done on the roof. Mrs. Guerry, in turn, indicated that she would not let Tropical continue its work on the roof until she had Weiner's report in hand and had the opportunity to further discuss the matter with her attorney, her son and others with whom she had consulted. The conversation ended with Respondent telling Mrs. Guerry that he would be waiting to hear from her. On September 26, 1989, Respondent wrote a letter to Attorney Lekach in which he complained that Mrs. Guerry was interfering with Tropical's efforts to make her whole. The letter read, in part, as follows: We do carry casualty insurance and I feel it may be best to supply you with the name and address of our agent and allow him to coordinate with Mrs. Guerry's homeowners agent. Truly, this situation is considered an "act of God" and I do not believe that we can adequately communicate with the customer as she is in such an excited state we now find her implacable. We would be glad to install the proper roof vents and do the final painting of her roof if she will permit us. If she will not, then we must close the file and direct her to our insurance company. This is really unfortunate! Sound roofing practices were utilized; we were careful to watch the weather and, although we had a sudden cloudburst, we did stay around to try to clean up. We have not been negligent and we have spent considerable time and money to resolve the situation. Please advise at your earliest convenience. Respondent next heard from Lekach on October 9, 1986. Later that same day, pursuant to Lekach's request, Respondent met with Lekach and discussed "the problems at the Guerry residence." The following day, Lekach sent Respondent a letter memorializing the highlights of their discussion. The letter provided, in part, as follows: You will be permitted access to the Guerry property for the following purposes: Inspection of the roof, cleaning of the yard which will include replacement of sod as necessary, replacement of topsoil as necessary, and removal of tar. The performance of the above shall neither be construed as an admission of liability on your part, nor an acceptance of this work as being satisfactory or complete. I agree, however, that it is imperative that steps be taken immediately to mitigate the damage. Further we will both be doing the following: obtain information about repair methods and costs for chattahoochee surface. obtain information about repair methods for the "staining" problem on walls and patio so that the area can be painted. review proposals for correction or replacement of roof, if necessary. There is going to have to be a certain amount of good faith between you and Mrs. Guerry if this situation is to be resolved without litigation. Accordingly, we are now permitting you access to the property in the hope that you will also attend to the other matters set forth above. Mrs. Guerry has been hesitant to accept a partial resolution of this problem without your commitment to complete all of the repairs and this is the reason that the cleanup was delayed in some respects. Hopefully, we will be able to work towards resolving all aspects of the damage. On October 11, 1986, Respondent dispatched a crew to the Guerry property to perform the excavation work that was necessary to remove the soil that had been contaminated by the mineral spirits used in the cleanup effort. On this occasion, the workers were given access to the property for this purpose and they removed and replaced the contaminated soil. On October 13, 1986, Tropical sent a crew to the Guerry property to inspect their roof. Mrs. Guerry would not permit the Tropical workers to enter the premises. She indicated that she would not allow the workers on her property to inspect or repair the roof until she had heard from all those with whom she had consulted regarding the matter. Having been denied access to the property by Mrs. Guerry, the workers left without performing their inspection. At no time thereafter did the Guerrys directly contact Tropical and request that the workers return to the residence to finish the repair of the roof. In the absence of any such direct communication from the Guerrys, Tropical did not attempt to do any further repair work on the roof after October 13, 1986. On October 6, 1986, the Broward County Environmental Quality Control Board had issued a notice of violation citing Tropical with discharg[ing] a substance (mineral spirits) to ground." A hearing on the charge was held before the Board on November 7, 1986. Respondent appeared on behalf of Tropical at the hearing. He admitted that Tropical was guilty of discharging a pollutant, to wit: mineral spirits, into the soil, although he explained that the violation was a product of ignorance on his part regarding the qualities of mineral spirits. Based on this admission of guilt, the Board imposed a $500.00 fine, which was subsequently paid by Respondent. In late 1986, the Guerrys filed with the Department of Professional Regulation a complaint against Respondent. An investigation of the complaint was conducted, following which an initial determination was made that there was "presently no probable cause to find that [Respondent] violated the contractor disciplinary statutes." Respondent was notified of this determination by letter dated May 14, 1987. This determination of no probable cause was subsequently reversed. On January 11, 1989, an administrative complaint was filed by the Department charging Respondent with wrongdoing in connection with the work performed on the Guerry home. The Guerrys no longer own the home. The property was purchased by Broward County in furtherance of the County's airport expansion project. Respondent has previously been disciplined by the Construction Industry Licensing Board. In early 1987, Respondent was fined $500.00 for failing to obtain a permit as required by local law. In March, 1988, he was fined $1,500.00 for failing to call for all required inspections. In August, 1988, he was fined $500.00 for proceeding without a required permit, failing to obtain all required inspections, failing to reasonably honor a guarantee, and displaying gross negligence, incompetence or misconduct.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Construction Industry Licensing Board enter a final order (1) finding Respondent guilty of gross negligence and incompetence, in violation of Section 489.129(1)(j) and (m), Florida Statutes, in connection with his supervision of the cleanup of the Guerry residence; (2) suspending Respondent's license for six months and imposing a fine of $1500 for said violation; and (3) dismissing the remaining charges against Respondent that are set forth in the instant Administrative Complaint. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 17th day of November, 1989. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of November, 1989.
Findings Of Fact Based on my observation of the witnesses and their demeanor while testifying, the documentary evidence and the positions of the parties, I hereby make the following: Thomas G. Walker (herein sometimes called "Licensee" or "Respondent") is a registered residential contractor and is issued license number RR 0009839. Thomas G. Walker was initially licensed by the Board in July of 1969 as an individual and during January, 1975, he changed his registration status as an individual to qualify Insulshield Roofing as the business entity through which he would conduct his business (Petitioner's Exhibit No. 1). An examination of the official records pertaining to the Licensee reveals that he does not now nor has he ever held a roofing license in the State of Florida. On February 16, 1979, the Licensee was apprehended contracting roofing without a State roofing contractor's license by the Board's representative and was issued a Notice of Violation (Petitioner's Exhibit No. 3). On July 26, 1977, the Licensee entered into an agreement with Jan Soderstrom, 501 Orlando Avenue, Indialantic, Florida, to remove the tile from the Florida Room of her residence and hot mop the herein-described roofing area, to replace tile as needed, to clean and coat the entire roof, and to install a cap over Ms. Soderstrom's chimney. He guaranteed the work for a period of five (5) years and charged a contracted price of $800.00. The Licensee was paid the contracted price of $800.00 by check dated August 4, 1977 (Petitioner's Exhibit No. 5). During early February, 1978, Ms. Soderstrom detected a leak in her roof and summoned the Licensee back to her residence to repair same. During February, 1978, Respondent returned to Ms. Soderstrom's residence to repair the leak in her roof. Upon his return, he removed several roof tiles and since February, 1978, to the present, he has not returned to this project. Clyde Pirtle, a field investigator for the Board, investigated the Licensee based on complaints that he received from Ms. Soderstrom and from a Mr. Capitz. On or about February 16, 1977, Mr. Pirtle discussed a Notice of Violation with the Licensee and explained to him the necessity to register as a Roofing Contractor, if he was in the business of acting as a Roofing Contractor. Mr. Charles D. Franklin, a building official of Indian Harbor Beach, Florida, is the custodian of the records in Indian Harbor, Florida. Based on an examination of the records by Mr. Franklin, the Respondent/Licensee is not registered as a Roofing Contractor locally.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby, RECOMMENDED: That the registered residential contractor's license, number 0009839, of the Licensee, Thomas G. Walker, d/b/a Insulshield Roofing, be suspended for a period of one (1) year. RECOMMENDED this 4th day of April, 1979, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 2400 Independent Square Jacksonville, Florida 32202 Thomas G. Walker d/b/a Insulshield Roofing 170 5th Street South Melbourne Beach, Florida 32951 J. K. Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211
The Issue The issue for consideration was whether Respondent's license as a registered roofing contractor should be disciplined because of the misconduct alleged in the Administrative Complaint filed herein.
Findings Of Fact At all times pertinent to the issues contained herein, Respondent, Bruce D. Gayton, was licensed as a roofing contractor in Florida under license number RC0030867, but at the time of the misconduct alleged herein, the license was delinquent and invalid. Respondent's license was placed on delinquent status for non-renewal when it expired on June 30, 1987 and was considered invalid until reinstated in April, 1988. The Petitioner, Construction Industry Licensing Board, (Board), is the state agency responsible for the licensing of contractors in this state. On August 27, 1987, John M. Mack and his wife contracted with Respondent, doing business as Roofing Enterprises, to replace the roof on their 70 year old house in Clearwater. The contract called for Respondent to remove the old roof, replace all rotten wood, and install fiberglass shingles as well as all other actions part thereof, including cleanup. For this, the Macks agreed to pay Respondent $2,930.00 to be paid one- third at commencement, one-third when dried in, and the balance due upon completion. The term "dried in" means to cover the roof base with felt and secure it so as to prevent moisture incursion. This constitutes the subsurface for the final roof surface. The contract did not provide a completion date. Respondent guaranteed his work for five years. Respondent started work on September 9, 1989 and was paid the first $1,000.00 by check. He started tearing off the existing roof and five days later, when only one quarter of the existing roof had been removed, requested the second installment of the contract price. Mr. Mack was out of town at the time, but Mrs. Mack gave him a second $1,000.00 check. At that time, far less than one third of the project had been completed. After that second payment was made, Respondent did "minimal work" on the project. He would appear at the job only intermittently and when he did, would leave after only a short while. When Mr. Mack asked about this, Respondent indicated it was too hot to work after 11:00 in the morning. He also complained that because the sub-roof was made of hard, old white pine, it was very difficult to remove the old nails. For several days in early November, 1987, Respondent did not show up for work and Mack's efforts to reach him by phone were unsuccessful. He finally filed a complaint with both the Better Business Bureau and the Department of Professional Regulation. Finally, on November 14, 1987, Respondent came to the work site and left after two hours indicating he had a meeting with other contractors on other jobs. The next day, when Respondent did not show up, Mr. Mack went to his house whereupon Respondent stated he had spent most of the $2,000.00 the Macks had given him on other projects and to pay his workers and did not have enough funds to finish the job. Mr. Archer, the only employee to work on the Mack property has not been paid at all for his work. Nonetheless, Mr. Mack instructed Respondent to do what he could with what was left and when that was gone, he would pay the balance. Though Respondent had previously indicated to Mr. Mack that he had secured all required permits, the day after the above discussion, he stated he had not done so and left the job site to get it without doing any work that day. Over the next 11 days, Respondent spent a total of 20 hours on the job. On November 17, 1987 it rained and because the roof was not secure, water leaked into the house. The following day, Respondent did not arrive for work until 10:00 AM. On November 19, 1987, when Mr. Mack called the lumber yard from which Respondent had ordered the shingles, he was told they were scheduled for delivery COD and were on their way. When they arrived, Mr. Mack refused to accept them and pay for them because he had already paid Respondent $2,000. Respondent, when told of this development, agreed to borrow the money for them from his brother but was unable to do so, and in order to get the job finally done, Mr. Mack agreed to pay approximately $200.00 for them. They were ultimately delivered. The next day, Respondent telephoned Mr. Mack and said he was coming to the site and would stay until the job was done. However, he did not get there until after 10 and left at 3:30 PM with the job incomplete. At 8:00 AM the following morning, Respondent again called Mr. Mack and reported he did not have enough money for the required flashings. He indicated he would come to work and finish up the shingling, but did not show up at all that day. On the day after, Respondent came with his wife who worked with him for a short while. On this occasion, Mack gave Respondent some more money for supplies, but Respondent left again before the job was complete. Respondent neither showed up for work nor called on both the next two days, but on the following day, November 25, 1987, he finally finished up the job except for the gravel roof on the rear house and the front part of the main house. Because the Macks had a tenant in the rear house who they did not want disturbed, they did not permit Respondent to work there, but he did finally finish up the front of the main house roof and the work that was accomplished was done satisfactorily. There was, however, an unused chimney on the main house which Respondent should have removed and roofed over. Instead, he improperly attempted to roof around it and since he was unable to make the area water tight, it resulted in severe leakage into the house which caused damage to several ceilings and some furniture. Throughout the entire course of the work, Respondent applied improper pressure to the Macks. He repeatedly threatened to file for bankruptcy and not complete the work, prompting the Macks to pay him before contractually called for. At the time for final payment, when Mr. Mack indicated he wanted to have the job checked before making that last payment, Respondent became angry and walked off. He has not been seen or heard from since. As a result of Respondent's failure to properly manage his funds and accomplish the job in a timely and professional manner, the Macks have sustained substantial damage to their property and have had to expend additional funds to get the work done properly. Respondent should have identified the unused chimney at the time he bid for the job and provided for its removal. If this would cost more, he should have so indicated. His failure to identify the problem and correct it constitutes negligence since it is impossible to properly roof around such an obstruction without leaks. Based on the information available to him, Mr. Verse, the Department's expert, concluded Respondent was guilty of gross negligence because: He was required to get a permit for this project and failed to do so, He was required to request inspections of the project as it progressed and failed to do so, He took an unreasonable amount of time to complete the job, (roofs are usually replaced in an expedient manner because re-roofing generates exposure of the house and contents to weather conditions), He failed to properly place the felt and thereafter cover it with the final coat in a timely manner (qualified roofers recognize that felt is insufficient roofing to prevent leaking), He diverted funds from this project to others for which they were not intended, He failed to properly supervise his employees, He did not complete the work called for under the contract, He failed to honor his warranty, and He failed to properly remove the old chimney as a part of the re-roofing process. With the exception of the failure to complete the job which was caused by Mr. Mack's refusal to allow Respondent to complete the roofing project on the gravel roof, Respondent's actions as outlined herein constituted gross negligence. In addition, he violated existing local law by failing to get a permit and have the required inspections made; he failed to perform in a timely manner; he diverted funds; he abandoned the job without it being completed; and he failed to honor his warranty.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that Respondent, Bruce D. Gayton's, license as a registered roofing contractor be suspended for three years under such provisions for reinstatement as may be deemed appropriate by the Board, and that he be fined $1,000.00. RECOMMENDED this 11th day of August, 1989 at Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of August, 1989. COPIES FURNISHED: Elizabeth R. Alsobrook, Esquire Department of Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Bruce D. Gayton 15010 113th Avenue #32 Largo, Florida 34644-4305 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Kenneth A. Easley, Esquire General Counsel DPR 1940 North Monroe Street Tallahassee, Florida 32399-0792 =================================================================
Findings Of Fact Jurisdiction findings Petitioner is the state agency charged with regulating licenses for roofing contractors in the State of Florida. At all times material to the allegations of these cases, Respondent held two licenses; he was a certified roofing contractor, license no. CC CO55580, and a registered roofing contractor, license no. RC 0060386. Respondent filed an application to qualify the company, D.S.S. & Sons, Inc., as a licensed roofing contractor; however, he failed to complete all documents necessary for licensure, and his application was closed for lack of response effective August 3, 1993. Respondent's address of record with the Department is 821 SW Dwyer Street, Port St. Lucie, Florida 34983. D.S.S. & Sons, Inc. is not now, nor has it ever been, licensed to perform roofing construction by the State of Florida. Facts common to all consumers On or about August 24, 1992, Hurricane Andrew struck Dade County, Florida, resulting in damage to hundreds of roofs. Roof repair or total replacement following the storm was not uncommon. Due to the large amount of damage, and the demand for roofing materials created by the volume of work to be performed, some contractors had difficulty obtaining roofing supplies. Additionally, some contractors had difficulty hiring qualified labor to perform the extensive roofing that was in great demand. The problems with obtaining materials and labor, however, were short term in that most roofing contractors made arrangements to bring in supplies and staff from other areas. In fact, by the time the work was to be performed in connection with these cases, the problems which had plagued the Dade County contractors were subsiding. Additionally, at all times material to these cases, the weather would not have been a factor to justify the delays complained of by these consumers. Rainy weather did not cause any prolonged work delays after the storm. Findings as to Helmly Charles Helmly resides at 11985 SW 98th Lane, Miami, Florida. His home was damaged by Hurricane Andrew and required roof replacement. Mr. Helmly contracted with Respondent to re-roof his home for the sum of $17,940.00. The contract was signed by Respondent's salesman, Felix Fowler, and identified D.S.S. & Sons, Inc. doing business as Darryl Saibic, Roofing Contractor as the licensed entity. Mr. Helmly paid an initial deposit of $5,382.00 in order for the Respondent to begin work on the project. The next payment, an additional $5,382.00, was to be due at the "dry in" stage of the job, with the final payment (the balance) due on completion. One of the contract provisions Mr. Helmly insisted upon was a completion deadline to be stated in the contract. He was expecting visitors and he was anxious to have the home re-roofed before their arrival. He insisted that a guaranteed completion date of March 7, 1993 be noted on the face of the contract. Mr. Helmly complied with all requirements of the payment schedule outlined by the contract. In fact, he remitted $10,764.00 even though the roof had not been at the "dry in" stage. Between January and February, 1993, the Respondent removed the old roof, installed a base sheet, and nailed a single ply roof membrane to the roof. After February, 1993, the Respondent failed to timely complete the Helmly roof. The value of the work performed by Respondent on the Helmly roof was no more than $3,588.00. The Respondent did not respond to numerous telephone calls and letters from Helmly, and threatened to place a lien on the Helmly property when Mr. Helmly attempted to cancel the contract in May, 1993. Mr. Helmly went to the Dade County Building Department and complained about roof leaks in June, 1993 (Respondent had still not done any further work). On or about June 4, 1993, Respondent sent a crew to the Helmly property to repair the roof. The repairs caused the roof to leak more. Respondent did not refund Mr. Helmly's money, did not complete the roof, and showed a gross indifference to the plight which resulted when he failed to timely complete the project. In July, 1993, desperate to have his roof completed, Mr. Helmly offered to purchase the tiles himself if Respondent would have a crew come install the new roof. Respondent agreed to have a crew install the tile within ten days of its arrival. On September 17, 1993, Mr. Helmly took delivery of the new tile, paid for it in full (a cost of $4,803.00) and notified the Respondent so that the installation could begin. Respondent never returned to complete the re-roofing. He failed to honor his verbal agreement to install the tiles. By letter dated October 1, 1993, Respondent offered to reimburse Helmly for the overage if he would hire another contractor to complete the job. On October 19, 1993, Mr. Helmly hired a new contractor who completed the installation of the new roof in early November, 1993. Approximately eight months after the deadline on Respondent's contract, Mr. Helmly had his new roof. Extra expenses totalling $2,936.21 were paid by Mr. Helmly as a result of the Respondent's abandonment of this job. Findings as to Gurdian On January 14, 1993, the Gurdians contracted with Respondent through his agent, Ed Comstock, to repair the roof on their home located at 13301 SW 110 Terrace, Miami, Florida. The contract was executed as D.S.S. and Sons, Inc. d/b/a Darryl S. Saibic, Roofing Contractor and called for a total payment of $7,725.00 for the work to be done. The Gurdians made a deposit of $2,300.00 on January 14, 1993 by check made payable to D.S.S. and Sons, Inc. and received a partial release of lien. On February 8, 1993, the Respondent pulled a permit for the Gurdian home but never called for inspections on this project. In February, 1993, all the tiles were removed from the roof and roofing paper was installed. On March 1, 1993, the Gurdians made a second payment of $2,300.00 by check made payable to D.S.S. and Sons, Inc. and received another partial release of lien. The Respondent did not timely complete the Gurdian roof. From June through November, 1993, Respondent sent the Gurdians unsigned notices claiming he would return to their job but did not do so. Numerous excuses were offered as to why the project was not completed; however, none of these had merit. The Gurdians waited until April, 1994 hoping the Respondent would return and complete the work. They drove to Respondent's office and left a message seeking assistance. Finally, Respondent recommended a company called CTI to complete the roof work for the Gurdians. When contacted, CTI told the Gurdians it would cost $7,600.00 to complete their job for which they, not Respondent, would be responsible. The Gurdians then attempted to notify the Respondent at his address of record by certified mail of their continuing problems but the letter was returned to them unopened. In June, 1994, the Gurdians hired another company to finish their roof which was finally complete and passed inspections on July 26, 1994. The Gurdians were required to pay a total of $13,475.00 to have their roof replaced because the Respondent failed to perform under the original contract. Due to the Respondent's abandonment and indifference in connection with this project, the Gurdians were damaged in an amount not less than $4,200.00. The value of the work performed by Respondent on the Gurdians' roof did not exceed $1,545.00. Respondent has not refunded any of the funds paid by the Gurdians. Findings of fact as to Vila Marta Vila resides at 11116 SW 133 Place, Miami, Florida 33186. Like the others discussed above, the Vila home was damaged and required a new roof. On January 13, 1993, Vila signed a contract with Ed Comstock acting on behalf of D.S.S. and Sons, Inc., doing business as Darryl S. Saibic, Roofing Contractor, to have her roof repaired for a total contract price of $7,200.00. A down payment of $2,160.00 made payable to the company was made at that time. On February 8, 1993, Respondent pulled a permit to re-roof the Vila home. On February 15, 1993, Vila paid an additional $2,160.00 to Respondent. At that time Respondent removed the tiles from the Vila roof and installed one layer of roofing paper over the roof decking. Despite representations from Respondent that new tiles would be delivered in approximately three to four weeks, the Respondent did not install a new roof on the Vila home. In February and March, 1993, the roof was patched three times to stop leaks but no substantive work was performed to install new tiles. Respondent did not return to the Vila home despite numerous requests from the homeowner for the work to be completed. In June, 1993, Respondent represented that the Vila job might be completed if the tiles were sent out COD. When Vila attempted to verify that information, she was told she had paid enough to not have that concern. However, no tiles were ever delivered to her home. In August, 1993, Vila, after Respondent failed to return telephone calls, wrote to Respondent and demanded a refund. She has not received one. Vila ended up paying $7,754.00 to another contractor to have her roof replaced. The value of the work performed by Respondent on the Vila project did not exceed $1,440.00 yet he has failed or otherwise refused to refund the difference between that amount and what she paid. Vila has suffered monetary damages in an amount not less than $4,800.00 as a result of Respondent's abandonment of this project. Findings of fact as to Bermudez Mr. and Mrs. Bermudez reside at 8335 SW 147th Place, Miami, Florida. On November 30, 1992, they signed a contract with Respondent in the amount of $6,400.00 to correct extensive leakage on both floors of the Bermudez home. Mrs. Bermudez gave a deposit in the amount of $1,860.00 and was told that the repairs would begin in two weeks and be completed in approximately five weeks. In December 1992, and January, 1993, the Respondent performed some minor patching but no significant work was undertaken to repair the Bermudez home. In January, 1993, Respondent pulled a permit to replace the Bermudez roof. Within a week of the permit, Respondent sent an unsigned form letter to the Bermudez advising them that there would be delays. In February and March, 1993, the Respondent's crew stripped the old tile off the Bermudez home and installed batten and roofing paper over the decking. Mrs. Bermudez made deposits totalling $3,720.00 to Respondent in connection with this contract. Despite numerous requests from Mrs. Bermudez, Respondent did not complete the roof. In July, 1993, Respondent sent a crew to the Bermudez home in connection with a leak but the repair did not resolve the problems and did not substantively finish the roof. As with the other cases, between July and November, 1993, Respondent sent numerous unsigned form letters to Mrs. Bermudez offering false or ridiculous excuses for why the project had not been completed. In January, 1994, Mrs. Bermudez filed a formal complaint against Respondent but he never completed the job nor refunded the deposits. Between March and July, 1994, Respondent represented he would complete the Bermudez job but did not do so. The Bermudez roof was not completed until December 13, 1994. As a result of Respondent's incompetence, inability, or refusal to complete the Bermudez roof, the family lived with a leaking roof for approximately two years and incurred unnecessary expenses. Respondent showed a gross indifference to the plight of the Bermudez family. Respondent could not have timely completed the projects described above during the period July, 1993 to July, 1994, as his workers compensation had expired. The numerous promises to perform the contracts as originally agreed were meaningless.
Recommendation Based on the foregoing, it is, hereby, RECOMMENDED: That the Department of Business and Professional Regulation, Construction Industry Licensing Board enter a final order revoking Respondent's licenses, requiring Respondent to make full restitution to the consumers in these cases before being entitled to seek new licensure, imposing an administrative fine in the amount of $10,000, and assessing costs of investigation and prosecution of these cases as set forth in the affidavits filed in this cause. DONE AND RECOMMENDED this 25th day of October, 1995, in Tallahassee, Leon County, Florida. JOYOUS D. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of October, 1995. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 95-1079, 95-1080, 95-1081, 95-1082 Rulings on the proposed findings of fact submitted by the Petitioner: 1. Paragraphs 1 through 155 are accepted. Rulings on the proposed findings of fact submitted by the Respondent: 1. None submitted. COPIES FURNISHED: Elizabeth Masters Senior Attorney Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 230 Jacksonville, Florida 32211 Darryl Saibic 821 S.W. Dwyer Road Port St. Lucie, Florida 34983 Richard Hickok Executive Director Department of Business and Professional Regulation Construction Industry Licensing 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792
Findings Of Fact Roger A. Lollis was licensed as a registered roofing contractor at all times material hereto, having been issued license number RC-0030088. His address of record on file with Petitioner has at all times been 912 Tuskawilla Street, Clearwater, Florida, and this is the address to which notice of the hearing was sent. The hearing notice was not returned to the Division of Administrative Hearings by the post office for any reason. Lollis has been the subject of two previous Final Orders imposing disciplinary actions by the Construction Industry Licensing Board. John P. Terranova was first licensed as a registered specialty contractor in August, 1985, having been issued license number RX-0049212 as the qualifying agent for Stretch and Seal Roofing Systems, Inc. Terranova and his wife are the only shareholders of this corporation, and he is the Chairman of its Board of Directors, as well as its President. On November 15, 1984, Mrs. Judith Fugitt executed a contract with Stretch and Seal Roofing Systems, Inc., through its authorized agent, Scott St. John, for work to be performed on her residence at 1636 Bravo Drive, Clearwater, Florida, in order to correct a problem she was having with leaks. The work to be performed was specified in the contract to include: clean and mildewcide roof surface; inspect for water damage beneath tiles that are cracked or broken; replace broken and cracked tiles as necessary; flow coat to seal chimney flashing against leaks; apply 15 year Stretch and Seal coating in color to be specified by home owner; and color to be applied approximately 2 weeks after Stretch and Seal is applied. The contract further stated that the expense of any labor or materials for work not specified in the contract, such as to replace rotten wood, would be the responsibility of the homeowner. The Fugitt contract provided a 15 year warranty and guarantee and stated, "All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices." The contract price for the work to be done on the Fugitt's house was $2500, which was to be paid $500 at commencement of the job, $1500 upon completion of the application of Stretch and Seal, and the balance upon completion of painting of the roof tiles. Although Terranova denies meeting with the Fugitts at the time this contract was executed, Mr. Elmer Fugitt testified that Terranova was present and gave his personal guarantee that the work would be done as specified in the contract and would correct the leak problem. Terranova also represented to Elmer Fugitt that he had 30 years experience in the roofing business. It is specifically found, based upon the demeanor of the witnesses, that the testimony of Elmer Fugitt concerning Terranova's personal involvement in this transaction on or about November 15, 1984, is credible, and Terranova's denial thereof is not. Shortly after November 15, 1984, work commenced on the Fugitt roof, and some rotten wood was discovered which needed to be replaced. Tim Egner, another authorized representative of Stretch and Seal Roofing Systems, Inc., then prepared another proposal for repair and replacement of the rotten wood, which Judith Fugitt also accepted. The contract price for this work was $482.50. Both St. John and Egner worked full-time for Terranova's company, with his knowledge and under his control. Terranova referred to Egner as his "operational manager" who handled customer complaints. The Fugitts paid Terranova, through Stretch and Seal Roofing Systems, Inc., a total of $2981.00 between November 27 and December 23, 1984, for work performed on their roof. This was the full amount due under the November 15, 1984 contract and also the subsequent contract for repair and replacement of rotten wood. In late December, 1984, all tiles were in place, the Stretch and Seal coating had been applied, but the tiles had not been painted. In January, 1985, the Fugitt roof continued to leak and Elmer Fugitt therefore contacted Terranova's company. After repeated contacts, Terranova arranged for Roger Lollis to inspect the roof. On March 12, 1985, Lollis obtained a permit from the Pinellas County Department of Building Inspection for roof repair on the Fugitt residence. Lollis never discussed what he was doing with the Fugitts, but was simply assigned to the job by Terranova. Mr. Fugitt saw Lollis on his roof one time. After tearing up a section of tiles and leaving a portion of the Fugitt roof exposed, Lollis walked off the job and never returned. Thereafter, Elmer Fugitt reset the tiles himself after repeated efforts by his attorney to contact Terranova had failed. The Fugitt roof has never been painted although they contracted and paid for this to be done by Terranova's company. At the hearing, Terranova denied his company either contracted for, or performed, roofing work. It was his testimony that he was only obligated to do painting, and it was Lollis' and the Fugitts' responsibility to do the roofing work. Terranova's testimony is not credible because it is contrary to the terms of the contracts the Fugitts executed with his company, and is outweighed by the convincing testimony of Elmer Fugitt. Terranova contracted for and did perform, through his company, roofing work on the Fugitt residence at a time before he was licensed as a roofing contractor. The roofing work performed by Terranova for the Fugitts would be found to be incompetent and would constitute misconduct in the practice of contracting if he had been licensed at the time. He did not repair the leaks, he accepted full payment for a job that was not completed, he avoided or failed to return repeated calls from and on behalf of the Fugitts, and he allowed their roof to be left exposed to the elements after Lollis walked off the job. Terranova failed to honor the guarantee set forth in his contract with the Fugitts. Lollis performed work on the Fugitt roof at the request and direction of Terranova in March, 1985, at a time Terranova was not a licensed roofing contractor. He did obtain a local permit, but did not call for any inspection. In fact, he walked off the job and left the Fugitt roof exposed. Lollis' actions constitute incompetence and misconduct in the practice of contracting, but there is no evidence he knew that Terranova was not licensed at the time. Lollis was not the qualifying agent for Stretch and Seal. Pinellas County building code ordinances require a permit for any roof repair that exceeds $50 and for any general construction that exceeds $500. Terranova failed to obtain any required permits for the Fugitt job. A final inspection on any roofing job for which a permit has been issued is required, but Lollis never called for one after he obtained the permit in March, 1985.
Recommendation Based upon the foregoing, it is recommended that the Construction Industry Licensing Board enter a Final Order: Dismissing the Administrative Complaint filed against John P. Terranova since it has not been shown that the Board has jurisdiction over him under Section 489.129(1)(m), Florida Statutes, for matters occurring prior to his having been licensed. Finding that Roger A. Lollis has violated Sections 489.129(1)(d),(j) and (m), Florida Statutes, and therefore imposing a six month suspension and $1000 administrative fine against him based not only on the facts found herein concerning his actions regarding the Fugitt roof, but also the fact that this is the third disciplinary action taken against his license by the Construction Industry Licensing Board. DONE AND ENTERED this 11th day of December, 1987, in Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of December, 1987. COPIES FURNISHED: W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 John P. Terranova 3 Birdie Lane Palm Harbour, Florida 33528 Roger A. Lollis 912 Tuskawilla Street Clearwater, Florida 33516 Fred Seely Executive Director Construction Industry Licensing Post Office Box 2 Jacksonville, Florida 32201 William O'Neil General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750
The Issue The issue for determination is whether Respondent, licensed as a registered roofing contractor, certified roofing contractor, and certified building contractor, committed various violations of Chapter 489, Florida Statutes, sufficient to justify the imposition of disciplinary sanctions against his licenses.
Findings Of Fact Respondent is Joseph H. Rayl, holder, at all times pertinent to these proceedings, of registered roofing contractor license no. RC 0034055; certified roofing contractor license no. CC C035625; and certified building contractor license no. CB C033206. Petitioner previously disciplined Respondent's license RC 0034055 through the imposition of a $250 fine by order dated July 11, 1985; and Respondent's license CB C033206 by suspension of license for six months and imposition of a fine of $2,500. Petitioner also found probable cause for three cases in 1987 that were closed with letters of guidance to Respondent. Petitioner is the Department of Professional Regulation, Construction Industry Licensing Board, the state agency charged with the regulation of contractors in the State of Florida. Respondent was the qualifying agent for Unique Construction, Inc., (Unique) at all times pertinent to these proceedings. Further, Respondent has been the qualifying agent for Superior Roofing & Construction Inc., (Superior) since February, 1988. On June 19, 1984, Mary Lois Brining, owner of a day care center for children known as Town and Country Schools of Bradenton in Manatee County, Florida, entered into a contract with Respondent to reroof the day care center. Respondent's personnel arrived at the school and removed the roof. Heavy rainfall then caused extensive damage to the interior of the facility and Brining complained to Unique. A representative of the company assured her that the situation would be resolved. Brining later paid Unique $623 to paint the school's interior, in addition to the cost of the roof replacement. While Respondent was never present during the construction, his workmen finished the roofing project on June 26, 1984. When leaks to the roof developed after completion of the job, Brining advised Unique of the leakage on numerous occasions. No action was taken by Respondent or Unique in response to Brining's telephone calls about the roof's leakage. Water leakage also damaged the carpet in Brining's facility, which she replaced at a cost of $2,000. In 1988, Brining finally hired another roofing company to correct the roof leakage. Helen M. Hayes, a resident of Gulfport, Florida, contracted with Unique to reroof the flat portion of the roof to her home on April 12, 1984, for a sum of $2,890. The job was finished on April 15, 1984. Two days later, the roof leaked. Hayes advised Unique and a representative came to the house and attempted to stop the leaks. After every rain, the roof leaked and Hayes would advise Unique. She never saw or spoke with Respondent. Finally, after 22 contacts with the company over a period of two and a half years, Hayes contacted local government building authorities. The building inspector for the City of Gulfport inspected the roof and told the company to replace it. Unique's workmen removed the roof in July, 1986, and left the house uncovered. That same day 10 inches of rain fell in the area of the residence, resulting in extensive damage to the home's interior and clothing which Hayes had stored in the home. Hayes called the police. The police called the building inspector who, in turn, called the roofing company. On July 28, 1986, Unique completed replacing the roof on Hayes' house. That new roof still leaks, the floor to the house is cracked from the leakage, the carpet has been saturated with water, plaster from the ceiling is falling to the floor, and there are water stains on the ceiling and walls throughout the residence. The proof further establishes that the City of Gulfport, located in Pinellas County, Florida, retained a private contractor to conduct an inspection of Hayes' roofing job in July of 1986. That inspection established that the roof should be replaced with a roof complying with building code requirements. Notably, while Unique obtained permits for the job, no final inspection of the project was ever obtained by Respondent's company in accordance with the Southern Building Code adopted as an ordinance by the City of Gulfport. James Oliver Prince is a resident of Lake Hthchineha, a settlement located in Polk County, Florida. He has never met Respondent. Prince entered into a contract with Unique in September of 1985. The reroofing job was completed on or about September 26, 1985. Leaks developed with the onset of the first rain after the completion of the job. Prince notified Unique and a representative came out to the residence to attempt to repair the roof and stop the leaks. This procedure continued on numerous occasions until November of 1987 when Prince attempted to contact Unique regarding the roof's leakage only to be informed that the telephone had been disconnected. Prince tried to locate Unique at the various offices listed on his contract, but received no answer. Eventually, due to the seriousness of the leaks and his inability to contact Unique, Prince hired a carpenter and replaced the roof at a cost of approximately $6,000. As established by testimony of Charles Fant, fire chief and building official for the City of Treasure Island, Florida, Unique obtained a construction permit for a reroofing job for the home of Vincent Ferraro located at 62 North Dolphin Drive in that city. The city has adopted the Southern Building Code as a city ordinance. However, the company never obtained the required final inspection for that job as required by the building code. On August 13, 1986, Carl and Ludie Buice of Bellview, Florida entered into a contract with Unique for a reroofing job on their home. Carl Buice passed away in November of 1986 Later, their son assisted Ms. Buice when leaks developed in the roof by attempting to contact the roofing company. The son, Alfred Buice, was unable to contact Unique. He then contacted the local offices of the Better Business Bureau; thereafter a representative of Superior, Respondent's successor company to Unique, came to the Buice residence on or about May 25, 1988, and gave Alfred Buice a check for $200 in connection with money previously spent by Buice to repair leaks to the roof. Even after repairs, the roof continued to leak to the point that it began to cave in around the roof's edges. Eventually, Alfred Buice had his mother's residence reroofed by another contractor on March 21, 1989, for $5,800. Testimony of Petitioner's expert witness establishes that Respondent was grossly negligent in meeting his qualifying agent responsibilities to supervise financial activities and construction practices of Unique. Further, Respondent's subordinates, who actually carried out roofing activities, performed those tasks incompetently. Respondent failed to comply with existing construction industry practices to inspect jobs where successive complaints were lodged by customers.
Recommendation Based on the foregoing, it is hereby RECOMMENDED that a Final Order be entered revoking Respondent's licenses as a registered roofing contractor, certified roofing contractor, and certified building contractor. DONE AND ENTERED this 7th day of July, 1989, in Tallahassee, Leon County. Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of July, 1989. APPENDIX The following constitutes my specific rulings, in accordance with Section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner's Proposed Findings. 1.-42. Addressed. Respondent's Proposed Findings. None submitted. COPIES FURNISHED: Elizabeth R. Alsobrook, Esquire Department of Professional Regulation The Northwood Centre, Suite 60 1940 N. Monroe St. Tallahassee, Florida 32399-0750 William E. Whitlock, III, Esquire 320 West Park Avenue Tallahassee, Florida 32301 Fred Seely, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 Kenneth E. Easley, Esquire Department of Professional Regulation The Northwood Centre, Suite 60 1940 N. Monroe St. Tallahassee, Florida 32399-0750
Findings Of Fact Bruce A. Williams, Respondent, is the holder of a registered roofing contractor's license from the Florida Construction Industry Licensing Board. The license number is CC C020246. Respondent is vice president of Dean Roofing and Sheet Metal, Inc. (The Dean Company), Post Office Box 2077, Clearwater, Florida. By proposal submitted March 31, 1983, and accepted by Marshall Kent on April 1, 1983, the Dean Company contracted to remove the existing roof on Kent's residence and replace same at a price of $8,600 (Exhibit 1). The work was supposed to start April 11, 1983 and be completed on April 15, 1983. This contract was signed on behalf of Dean Company by Bruce A. Williams, Respondent, as vice president of Dean Company and by Marshall Kent. Kent is an experienced residential contractor who acknowledged having built approximately 2,000 homes. While removing the existing roof, Dean Company workers found the 30-year old house had three plys of roofing applied since the house was constructed and to remove this thick roof heavier equipment that normal was required. Kent's residence had a tectum roof decking which consists of a metallic-fiber substance which has a long life and serves as inside ceiling and outside roof decking over which built up roofing is applied. While removing the existing roof the tectum deck was fractured and Kent ordered Dean Company workers off the Job. By letter dated April 18, 1983 (Exhibit 6) Respondent advised Kent that the cost of replacing the damaged tectum would be borne by the Dean Company and it was necessary to get on with the project before additional damage was done through the areas of roof exposed by removal of the original roof. Upon seeing Exhibit 6, K. A. Williams, president of Dean Company and father of the Respondent, concluded that the problems may have been exacerbated by a personality conflict between Respondent and Kent, and turned the job over to R. L. MacMurry, another vice president at Dean Company, who had considerable experience in the roofing business. By letter dated Apri1 19, 1983 (Exhibit 7) MacMurry, on behalf of Dean Company, advised Kent that since he questioned their ability to properly install the new decking to replace the damaged decking they would employ the services of a general contractor to replace the damaged tectum, and if the replaced tectum did not match the original tectum they would have the entire ceiling painted. Kent denies receiving this letter. Kent refused these offers and by letter dated April 21, 1983 "Exhibit 8) R. A. Williams pointed out that Kent's refusal to allow Dean Company to immediately complete the roofing work in progress could lead to serious damage from water intrusion and that such damage would be Kent's responsibility. On Friday, April 29, 1983 a meeting was held between the Kents, Williams and MacMurry at which Dean Company -agreed to immediately recommence roof work, bring in a general contractor to replace the damaged decking and complete the contract. Kent demurred until the agreement was reduced to writing, preferably by an attorney. Kent prepared an endorsement on Exhibit 9 in which responsibility for the repairs was, in Kent's opinion, shifted to the general contractor. This endorsement was accepted by the parties on May 3, 1983. The residence was reroofed in accordance with the latter agreement and Kent never advised Dean Company that all work was not satisfactorily completed. Dean Company provided Kent with a five (5) year Roofing Guarantee (Exhibit 11) dated May 10, 1983, which was forwarded to Kent by letter dated May 11, 1983 (Exhibit 10) with an invoice for the total owed on the job (Exhibit 14). Kent responded with letter dated May 17, 1983 (Exhibit 23) contending he was not whole, the job was not. complete and the guarantee was a joke. Kent considered the Roofing Guarantee suspect because it was a form used by the Midwest Roofing Contractor's Association. Shortly after this time Kent was hospitalized for psychiatric treatment and upon his release from the hospital in August 1983 he found that a mechanic's lien had been placed on his property by Dean Company. He also found what he believed to be leaks into the ceiling of a bedroom but made no complaint to Dean Company. Kent then hired a roofer, Chuck Goldsmith, to inspect the work done on his roof. When Goldsmith tried to negotiate the dispute between Kent and Dean Company, Kent fired him. Kent then hired William A. Cox, an architect and roofing consultant, to inspect the roof and advise what needed to be done. Cox inspected the roof in late October 1983 and submitted a list of discrepancies he recommended for correction. In one place he was able to insert a knife blade between the Fla. roof and the vertical wall against which the roof abuts which indicated no sheathing had been installed. Expert witnesses opined that without metal sheathing the roof would have leaked within six to eighteen months and the roof could never have been intact for the 30 years the house had been built without sheathing at such a joint. The vertical side of the original flashing would have been under the stucco at this point and there was no evidence that the stucco was disturbed when the new roof was first installed by Dean Company. New flashing was subsequently installed by Dean Company at this juncture but no one testified respecting the flashing observed or not present when this new roof was removed to insert the new flashing. Failure to insert flashing at such a juncture of horizontal roof and vertical wall would constitute a violation of the Standard Building Code. The report Cox gave to Kent was not made known to Dean until January 1984. By letter dated August 21, 1984 (Exhibit 13) Clark and Logan advised K. A. Williams that they would do all of the work listed in the Cox report on the Kent residence. This work was done in August 1984. Kent contends the leak continued in his bedroom after the work was completed but he never relayed this information to either Clark and Logan or to Dean Company. He has yet to pay one penny for the work done on his roof. Kent considered Clark and Logan to be the prime contractor on the job at the time the August 1984 work was done. Kent further testified that following that work Clark and Logan abandoned the job and he also filed a complaint against that general contractor. Since April 1983 following the damage to the tectum decking, Respondent, Bruce Williams, has had no responsibility for, and did no supervision of, the reroofing of Kent's residence. When the roof was inspected by the Pinellas County Building Inspector he found the workmanship done on this job only slightly below standard. At one place-on the roof Cox found the lower section of flashing overlapped the upper section of flashing which would have permitted water to enter under the flashing. This was a mistake but not an uncommon one for roofers to make. When pointed out to Dean Company the situation was promptly corrected.
The Issue The issues to be resolved in this case are those promoted by the second amended administrative complaint brought by the State of Florida, Department of Professional Regulation against the Respondent, David W. Crosby. Briefly, the basic allegations are that the Respondent granted to James Crosby, d/b/a U.S. Seamless Roof Systems, the unlimited opportunity to obtain building permits under the Respondent's contracting license. This arrangement, it is alleged, was in the face of a circumstance in which James Crosby was not registered, certified, or otherwise licensed by the Construction Industry Licensing Board, nor had the Respondent qualified U.S. Seamless Roof Systems with the Construction Industry Licensing Board. It is further alleged that between August 1982 and in or about 1985 James Crosby operated a roofing contracting business in St. Johns County, Florida, and in St. Augustine, Florida, and utilized the Respondent's authorization to obtain certain building permits and that James Crosby then performed roofing work authorized by those permits. By reason of this arrangement Respondent is said to have violated Sections 489.119 and 489.129(1)(e) (f) (g) (j) and (m), Florida Statutes. There are additional allegations of similar nature pertaining to work in Brooksville and Inverness, Florida.
Findings Of Fact Facts found based upon responses to requests for admissions propounded from Petitioner to the Respondent (see Petitioner's Exhibit 1 admitted into evidence) Respondent's name is David W. Crosby. Respondent is a certified roofing contractor in the State of Florida having been issued license number CC CO 15442. At all times material to the pending Administrative Complaint, Respondent was a certified roofing contractor in the State of Florida having been issued license number CC CO 15442. Respondent's license number CC CO 145442 is active for the period expiring June 30, 1987. In or about August 1982, Respondent issued an unlimited authorization, addressed "To whom It May Concern," which authorized all building departments to issue roofing permits to Respondent's brother, James Crosby. Said James Crosby was operating a roofing business in the period 1982 to 1985, in and about the St. Johns County and St. Augustine area. On or about January 13, 1983, said James Crosby, d/b/a U.S. Seamless Roofing Systems obtained permit number 12102 from the City of St. Augustine. Said permit, number 12102, was obtained to repair a roof for Zorayda Castle of 83 King Street, St. Augustine, Florida. On or about February 3, 1983, said James Crosby, d/b/a U.S. Seamless Roofing Systems, obtained permit number 12122 from the City of St. Augustine. Said permit, number 12122, was obtained to reroof the residence of Zorayda Castle of 83 Ring Street, St. Augustine, Florida. On or about February 24, 1983, said James Crosby, d/b/a U.S. Seamless Roofing Systems, obtained permit number 12158 from the City of St. Augustine. Said permit, number 12158, was obtained to reroof the residence of Lillian Perpall of 67 Abbott Street, St. Augustine, Florida. On or about May 17, 1983, said James Crosby, d/b/a U.S. Seamless Roofing Systems, obtained permit number 12288 from the City of St. Augustine. Said permit, number 12288, was obtained to reroof the residence of Emily M. Alexander of 20 Cuna Street, St. Augustine, Florida. On or about May 2, 1983, said James Crosby, d/b/a U.S. Seamless Roofing Systems, contracted with Lawrence Golden to repair the roof at Golden's residence at 17 Bay View Drive, St. Augustine, Florida, for a contract price of $985. On or about March 28, 1984, said James Crosby, d/b/a U.S. Seamless Roofing Systems, used contractors license number CC CO 15442 to obtain permit number 3781-81 from St. Johns County Florida. Said permit, number 3781-81, was obtained to reroof the residence of Burton Chase of St. Johns County, Florida. On or about March 28, 1984, said James Crosby, d/b/a U.S. Seamless Roofing Systems, used contractors license number CC CO 15442 to obtain permit number 3780-81 from St. Johns County, Florida. Said permit, number 3780-81, was obtained to reroof the residence of Fred Jensen of St. Johns County, Florida. On or about May 7, 1984, said James Crosby, d/b/a U.S. Seamless Roofing Systems, contracted with Ceal Butler to repair Butler's roof on his residence at Rt. 3, Box 56W3, St. Augustine, Florida, for the contract price of $1,335. Said contract referenced in number 20 above, was executed on a printed form bearing contractors license number CC CO 15442. At no time relevant hereto did Respondent qualify the roofing business, American Roof and Waterproofing Company and/or American Roofing and Waterproofing Company. Facts found based upon testimony at final hearing and exhibits admitted at final hearing James Crosby is also known as James A. Crosby, Jr., and Jim Crosby. On May 17, 1982, James A. Crosby, Jr., who held registered roofing contracting license number RC 0029375, voluntarily relinquished that license in Department of Professional Regulation, Construction Industry Licensing Board v. James A. Crosby, Jr., DPR Case No. 006237. On June 30, 1987, the Construction Industry Licensing Board, in accordance with that voluntary relinquishment, entered a final order approving and accepting the relinquishment. See Petitioner's composite Exhibit 3. James Crosby, in those instances described in the fact finding related to roofing contracting activities, was unlicensed and therefore not authorized to practice contracting, to include roofing contracting. See Petitioner's Exhibit 4 admitted into evidence, a February 7, 1986, notice to cease and desist in the case of State of Florida, Department of Professional Regulation vs. James Crosby, DPR Case No. 62490, in which it is indicated that James Crosby does not hold the necessary license to do roofing work or other forms of contracting contemplated by Chapter 489, Florida Statutes. Petitioner's Exhibit 5 is a copy of the general authorization which Respondent directed "To Whom It May Concern" in August 1982 authorizing James Crosby ". . . to pull permits for all roof work done by U.S. Seamless Roof Systems, St. Augustine, Florida." A copy of Respondent's certified roofing contractors license was attached to this authorization. This authorization has never been withdrawn and still remains on file with the City of St. Augustine, Florida, Building Department. At all relevant times related to the second amended administrative complaint, the City of St. Augustine, Florida, by ordinance, had adopted the Southern Building Code, which required building permits to be issued by the City before James Crosby or the companies under whose name he was doing business could undertake the various projects that are contemplated by the second amended administrative complaint. In January 1983, James Crosby entered into a contract with Wallace Mussallem for the roof repair in a tourist attraction in downtown St. Augustine, Florida, known as Zorayda Castle. Price of the repairs was approximately $6500. Petitioner's composite Exhibit 6 admitted into evidence pertains to various building permit applications and for certificate of appropriateness which James Crosby filed related to the Mussallem job. Crosby was operating under the name U.S. Seamless Roofing Co. as depicted in the aforementioned composite exhibit. Crosby completed the job and was paid the full amount of the contract. Crosby warranted his repair work for a period of ten years. During the initial two years, the roof did not leak; however, in 1986 a number of leaks occurred in the roof. Mussallem was unable to locate James Crosby to fix the roof and Mussallem had another roofer effect repairs and spent $3000 to have one section of the roof repaired. As of the time of the hearing, when Mussallem gave his testimony, part of the roof was still leaking and needed to be fixed. Respondent was never involved in the transaction between Mussallem and James Crosby, beyond giving permission to James Crosby to pull building permits from the City of St. Augustine, Florida. On March 4, 1984, Mr. and Mrs. William Blanchard entered into a contract with James Crosby, d/b/a American Roof and Waterproofing Company. James Crosby's associate, Basil R. Boone, was the person who estimated the job; however, the contract was with James Crosby. A copy of that contract can be found as Petitioner's Exhibit 14 admitted into evidence. It calls for the repair of the roof on the Blanchards' residence in St. Augustine, Florida. On April 5, 1985, James Crosby applied for a building permit from the City of St. Augustine to do the roofing work at the Blanchard home, and on April 30, 1985, that building permit was issued. Petitioner's composite Exhibit 8 is a copy of the application for permit and the permit. The price of the contract was $1575. James Crosby was paid for the roofing work. In the course of this transaction, William Blanchard had no occasion to deal with the Respondent. On May 7, 1984, James Crosby, d/b/a U.S. Seamless Roof Systems contracted with Ceal Butler of St. Johns County, Florida, to do roof repair work on a mobile home belonging to Mr. Butler. See Petitioner's Exhibit 15 admitted into evidence. The contract price was $1335 and Crosby guaranteed the work for ten years. May l8, 1984, James Crosby, as referred to in the check written to the Butlers as "Jim Crosby," was paid the contract amount. The contract form that was utilized in the Butler case referred to the Florida certified contracting number which pertains to the Respondent. Notwithstanding this reference, Respondent did not involve himself with this project. The Butlers immediately began to experience problems with the roofing work done by James Crosby. There were leaks in the roof repair work. The Butlers made numerous requests to have James Crosby honor the warranty, but the repairs were not made. Eventually, another roofer other than James Crosby had to make the repairs on the roof. Lillian Perpall owned a home in St. Augustine, Florida, and contracted with James Crosby to do roofing repair work at her residence. A copy of the contract may be found as Petitioner's Exhibit 17 admitted into evidence. James Crosby was doing business in this instance as U.S. Seamless Roof Systems. The contract price was $4875 and the project carried a ten-year guarantee. On February 24, 1983, in furtherance of the conduct of the project, James Crosby applied for a building permit which was granted that same day. A copy of the application and building permit may be found as Petitioner's composite Exhibit James Crosby was paid the full amount of the contract price for concluding the roofing repair work. Within a year after the work had been done, there was a leak in the roof and James Crosby came and put another coat of material on the roof in response to the complaint of Ms. Perpall. In the last eight or ten months, the back porch area where roof repairs had been made began to leak. Ms. Perpall has tried to contact James Crosby about that problem and has been unable to. In particular, she tried to make contact at the telephone number listed on the contract document that was signed. On the evidence presented, it is found that the Respondent did not participate in the roofing repair work at the Perpall residence, On October 14, 1982, James Crosby, d/b/a U.S. Seamless Roof Systems contracted with Edward Carriere to perform room repair work on Carriere's residence in St. Augustine, Florida. The contract amount was $5100 and the contract included a ten-year guarantee. A copy of the contract may be found as Petitioner's Exhibit 18 admitted into evidence. This contract format bears Respondent's Florida certified contractor's number. In furtherance of this work, James Crosby applied for a building permit from the City of St. Augustine on September 28, 1982, and that permit was issued that same day. A copy of the application and permit may be found as Petitioner's composite Exhibit 11 admitted into evidence. A second building permit related to this work was issued on October 27, 1982, from the City of St. Augustine as acknowledged by James Crosby and is found as part of the Petitioner's composite Exhibit 11. From the beginning, following the work, Carriere has experienced problems with the repair work. These problems are leaks in the roof. They have caused damage in the kitchen and living room area of the Carriere home. James Crosby responded to complaints about the room leaking, but did not fix the problem. The roof leaked from 1983 to 1985. By 1985, Carriere was unable to locate James Crosby to fix the leaking roof. Being unsuccessful in locating James Crosby, Carriere hired another roofer to fix the problem in January 1986. This cost an additional amount of approximately $5800. Carriere never dealt with the Respondent in the roof repair project at his home. On May 2, 1983, Lawrence G. Golden contracted with a representative of U.S. Seamless Roof Systems, the company of James Crosby, to have roof repair work done at the Golden residence in St. Augustine, Florida. A copy of the contract entered into with the company be found as Petitioner's Exhibit 19 admitted into evidence. The contract amount was $985 and the work carried a ten-year guarantee. Lawrence Golden paid the man $985 called for by the contract. Mr. Golden had problems with the roof repair work with the advent of heavy rains, in that the roof leaked. After numerous attempts to contact the company, James Crosby came to examine the nature of the complaint. James Crosby did not fix the problems with the leaking roof or cause them to be fixed until Golden had made a complaint to the State of Florida, Department of Professional Regulation. James Crosby did not obtain a building permit for the roof repair work, nor was a building permit obtained by anyone other than James Crosby. Golden did not deal with the Respondent in the transaction involving the roof repair. On July 15, 1982, Wilbur Lane contracted with James Crosby d/b/a U.S. Seamless Roof Systems to perform roof repair work on Lane's residence in St. Johns County, Florida. The roof repair contract carried the certified roofing contractor license number associated with the Respondent. The amount of the contract price was $1300 and the work carried a ten-year guarantee. James Crosby completed the construction work and received the full payment. A copy of the contract may be found as Petitioner's Exhibit 20 admitted into evidence. Although James Crosby was paid the amount contemplated by the contract, the roof repair work was not successful. After the project was undertaken, Lane experienced leaks inside of his home and made numerous attempts to try to contact James Crosby to take care of the problem. Crosby did attempt to fix the leaks, but failed in the attempt. Eventually Mr. Lane was unable to contact Crosby to continue the effort at rectifying the problem and Mr. Lane had to complete his own repair work on the roof to stop the leaks. Lane never had occasion to deal with the Respondent in this project. 35, The Department of Professional Regulation investigator Augostino A. Lucente investigated the complaint that had been filed by Lawrence Golden and spoke with the Respondent. Respondent indicated that he did not know anything about Mr. Golden or his problem or the fact that roofing repair work had been undertaken by U.S. Seamless Roof Systems. Respondent did indicate to Lucente that James Crosby was using Respondent's certified roofing contractor's license to obtain building permits. Respondent stated that he was trying to do his brother a favor by setting up a company for him in the St. Augustine area. In actuality, James Crosby may not be the brother of Respondent and may in fact be Respondent's cousin. Respondent told Lucente that he had issued the authorization letter, Petitioner's Exhibit 5, and that he had intended to open up a business in the St. Augustine area and to put James Crosby in charge. After about six weeks, Respondent said that he determined that he did not want to do anything with the St. Augustine situation and left everything as it was. This decision came about in September 1982. Respondent also denied any knowledge of the Carriere contract. On October 22, 1986, Petitioner took action against the Respondent in DPR Case Nos. 59109 and 59115 by the entry of a final order disciplining the license which is at issue in this proceeding. A copy of that final order and the underlying administrative complaint may be found as Petitioner's Exhibit 2 admitted into evidence.
The Issue The issues are based upon an administrative complaint brought by the State of Florida, Department of Professional Regulation against Phillip E. Sheffield, Respondent. In particular, Respondent is said to have violated the building code of the City of Jacksonville, Florida by failing to obtain a building permit before commencing construction work related to a roofing project and building the roof to a slope that was contrary to that local building code. For violations of the City of Jacksonville building code, Respondent is said to have violated Section 489.129(1)(d), Florida Statutes, by willful or deliberate violation and disregard for the applicable building code of the municipality. Finally, Respondent is said to have violated Section 489.113(3), Florida Statutes by failing to subcontract roofing work.