CHARLES H. COLVIN vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-002431 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 24, 1990 Number: 90-002431 Latest Update: Mar. 13, 1991

The Issue Whether respondent should admit petitioner to the examination for Class B Wastewater Treatment Plant Operator certification or deny admission for failure to comply with Rule 17-602.300(3), Florida Administrative Code?

Findings Of Fact At the time and place set for final hearing, neither petitioner nor respondent presented any evidence on which findings of fact could be based.

Recommendation It is, accordingly recommended that respondent deny petitioner's application for certification as a Class B Wastewater Treatment Plant Operator, without prejudice to the filing of a subsequent application. RECOMMENDED this 13th day of March, 1991, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of March, 1991. COPIES FURNISHED: Charles H. Colvin 2140 Bay Road Neptune Beach, FL 32233 William H. Congdon, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400

# 1
JOHN GEE vs DEPARTMENT OF HEALTH, 97-003521 (1997)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Aug. 01, 1997 Number: 97-003521 Latest Update: Jul. 14, 1998

The Issue The issues in this case are whether Petitioner was responsible for maintaining a sanitary nuisance on his property by piping sewage onto the ground from the septic system and by ignoring the need to repair a failed septic system; and whether the Department of Health properly issued a citation to Petitioner for violation of Sections 386.041(1)(a) and (b).

Findings Of Fact In November, 1995, a Department of Health, Volusia County Health Department employee, Sherry Rodriguez, was performing a sanitary survey of the water system at 479 Maytown Road, Osteen, Florida, when she observed sewage on the ground. The property in questions consists of a large, two-story house which contains rental units. The house is provided water by a well on the property and sewage is handled by an onsite septic system. On November 6, 1995, Ms. Rodriguez issued a Notice of Violation for the sanitary nuisance which stated that the violation must be corrected by November 20, 1995. The septic system was not repaired by November 20, 1995. Ms. Rodriguez subsequently issued a Notice of Intended Action (NIA), giving Petitioner a deadline of December 5, 1995, to repair his system. When Ms. Rodriguez went to the property to serve the NIA, she observed PVC pipe on the ground, with one end at the septic tank and the other at the read of the property. Sewage was on the ground at the end of the pipe. Ms. Rodriguez took photographs of the pipe before she departed. Agency employee, Britt Williams, visited Petitioner's property on November 1, 1996, and observed sewage on the ground. Mr. Williams issued a follow-up NIA to Petitioner on January 30, 1997, which required Petitioner to repair the septic system by February 3, 1997. Petitioner did not obtain a repair permit to correct the violations, therefore, Mr. Williams issued a citation for the violations of sewage on the ground and having an improperly maintained septic system.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That a final order be entered affirming the civil penalty against Petitioner and requiring Petitioner to repair his septic system. DONE AND ENTERED this 8th day of April, 1998, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 8th day of April, 1998. COPIES FURNISHED: John Gee 1245 Gee Whiz Lane Osteen, Florida 32764 Charlene J. Petersen, Esquire Department of Health 420 Fentress Boulevard Daytona Beach, Florida 32114 Angela T. Hall, Agency Clerk Department of Health Building 6 1317 Winewood Boulevard Tallahassee, Florida 32399-0700 Dr. James Howell, Secretary Department of Health Building 6, Room 306 Tallahassee, Florida 32399-0700

Florida Laws (4) 120.57381.0065381.0067386.041
# 2
DELCIE J. SUTO, CAROL B. RILEY, JOHN E. MONSEES, CRAWFORD SOLOMAN, KAREN M. ENGLISH, AND MARILYN NEHRING vs CELEBRITY RESORTS, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002722 (1991)
Division of Administrative Hearings, Florida Filed:Ocala, Florida May 06, 1991 Number: 91-002722 Latest Update: Aug. 13, 1991

The Issue The ultimate issue is whether Celebrity Resorts, Inc., (Celebrity) is entitled to a permit to construct a wastewater treatment and reuse/disposal facility in Marion County, Florida.

Findings Of Fact Proposed Project Celebrity is seeking a DER permit to construct a 0.065 million gallon per day wastewater treatment and reuse/disposal facility to serve a proposed recreation vehicle (RV) park. The facility is to be located in northern Marion County on the southern border of Orange Lake, an Outstanding Florida Water. The RV park is to be located on 75 acres of land, and is to contain 372 RV and "park model" sites, four bath houses, a clubhouse, and an expanded boathouse. The sewage treatment plant (STP) and effluent disposal system, consisting of a spray irrigation system, are to be located on the southern end of the site, away from Orange Lake. There is a "break" in the watersheds of the Celebrity property caused by a ridge across the approximate center of the project site. The effect of this "break" is that approximately one-half of the property drains toward the lake while the approximate southerly half of the property drains into an independent depression creating a watershed separate from the lake. Some underground pipes for a sewage collection system were installed at the site without an appropriate DER permit. Celebrity stopped the installation upon notice from DER that a permit was required for such installation. The permit needed for the installation of the collection system pipes was not the permit for the sewage treatment project which is being considered in this proceeding. Celebrity was penalized for its collection system violation, which was resolved with a consent order. Sewage Treatment Plant (STP) The STP is an extended aeration plant. It is designed to meet secondary treatment standards (90% removal of BOD and suspended solids from raw sewage) and basic disinfection. This type of treatment plant is very reliable. All mechanical components have a 100% backup so if a pump or blower fails, another is available to operate. The STP is designed to be capable of treating the flow from this RV park. Additionally, the facility has a holding pond for treated sewage effluent that can store five days of flow. Furthermore, because the RV park is a transient facility, it is possible in an emergency to shut down the entire plant and have people leave. By its nature, this is much more convenient in an RV park that in a residential or commercial neighborhood. The holding pond is to be lined with a 60 millimeter high density polyethylene liner, so there should be no leakage to the ground or groundwater even if there is an accident in the STP causing release of untreated sewage into the holding pond. The STP is to be maintained five days a week and must be attended for three nonconsecutive visits a week by a Class D certified plant operator. The amount of dissolved/undissolved heavy metals in the effluent is typically not a problem in domestic sewage effluent such as from the proposed RV park. To the extent that trace amounts of metals will exist, the STP will remove some heavy metals from the effluent during the treatment process and entrain them in the sludge (which will be taken to appropriately licensed landfill). There is no possibility of effluent leaking or discharging from the plant to directly discharge to Orange Lake, even if the STP completely malfunctions. Although the proposed STP is not a highly sophisticated plant, reasonable assurances have been provided that the STP will comply with DER's requirements for secondary treatment and basic disinfection and proper operation. Effluent Disposal System (Spray Irrigation System) Phase I of the effluent disposal system (spray irrigation system) is 3.66 acres in size, with an additional 1.7 acres designated if Phase II is implemented. Approval under this permit authorizes only the 3.66 acres on Phase I. Numerous separate sprinkler heads will spray the treated effluent on the field. The heads can be separately controlled and shut down. The sprayfield is sited on the southwestern corner of the 75-acre site and is separated hydrologically from the Orange Lake drainage basin by the "break" referred to in Paragraph 4 above. Therefore, surface water drainage in the area of the sprayfield drains away from the lake and does not connect back to the lake. The permitted loading rate is 1.7 inches per week, or approximately 24,000 gallons per day at full capacity. This amount corresponds to only approximately 170% of natural rainfall, but is more evenly distributed and controlled. After uptake of nutrients by green plants and evaporation (evapo- transpiration), the average amount of treated effluent that will percolate below the "uptake zone" to the surficial aquifer (to the extent that such exists on the site) is 0.3 to 0.4 inches per week. The surficial water table in the area of the sprayfield generally flows to the north toward the lake, although the flow is not immediately direct toward the lake. The Floridan Aquifer (which is beneath the intermittent surficial water table) in the area of the sprayfield generally flows away from the lake to the south and southeast. There are four sinkholes on the 75-acre site, although none of these four sinkholes have been identified on the 3.66-acre sprayfield. The four sinkholes on the 75-acre site and the majority of sinkholes in the area are "subsidence sinkholes." These sinkholes do not result in an open void down to the limerock after the collapse forming the sinkhole, but instead continue to have unconsolidated material above the limerock, even though a depression forms on the surface. One of the sinkholes has standing water within it and could possibly represent a connection with the lake water table or the Floridan Aquifer, but that sinkhole is separated hydrologically from the sprayfield site by the "break" across the property. There will generally be a slight increase in hydrologic conductivity through a subsidence sinkhole, since the unconsolidated material on the surface remains and is loosened. In some cases there may be even less hydrologic transmissivity due to a "jamming up" of the unconsolidated material, and in some cases there may be an increase in transmissivity when the unconsolidated material falls into an even less consolidated state. A "lineament" may exist on the 75-acre site. A lineament is a fracture zone, which indicates an increase in ground water transmissivity, resulting in an increase in solution of limestone and therefore indicating a more likely location for sinkhole formation. If a sinkhole develops within the sprayfield and if the sinkhole results in an increased area of ground water transmissivity, it could be a conduit for treated effluent to reach the surficial aquifer or Floridan Aquifer. Sinkholes which may form on the site are subject to being repaired with impervious material which prevents their becoming routes of contamination to the aquifer. In addition, the loading rate of any single sinkhole that forms within the spray irrigation field is so light and so easily shut down that there is a high confidence rate that no new sinkhole will act as a conduit for even the small immediate discharge over the area of the new sink to reach the Floridan Aquifer. A spray irrigation effluent disposal system is appropriate for this area which is subject to sinkhole formation. Spray irrigation allows dispersal of the effluent over a large area as opposed to a percolation pond which concentrates in the percolation area and therefore increases the chance of sinkhole formation and the chance of larger amounts of effluent reaching the Floridan Aquifer if all the intervening safeguards should fail simultaneously. In addition, the repair of any sinkhole forming within the sprayfield is simplified by the ability to simply shut off the sprinkler head or heads affecting that sinkhole while repair is being effected. Permit conditions further limit excessive effluent application rates by limiting the amount of flow, prohibiting application during storm events, and requiring monitoring of the flow. Spray irrigation is a common method of effluent disposal which generally has fewer problems than use of percolation ponds. No evidence has been presented that discharge from the sprayfield will cause violations of groundwater quality standards or violations of surface water quality standards, including the Outstanding Florida Water requirements in Orange Lake. Reasonable assurance has been provided that the proposed effluent disposal system will not violate DER water quality standards or other applicable DER rules. Standing Petitioner Suto could be substantially affected by this proposed facility if it causes pollution to Orange Lake since she uses the lake for nature photography. Additionally, she resides to the southeast of the proposed sprayfield and has concerns over contaminated ground water reaching her property and affecting her drinking water. Petitioner Riley could be substantially affected by this proposed facility if there is pollution to the Floridan Aquifer since she lives southeast of the proposed facility and has two drinking water wells on this property. Additionally, Petitioner Riley is a user of Orange Lake and therefore could be substantially affected by the proposed facility if it impacts the lake. Petitioner Solomon could be substantially affected by the proposed project if the project impacts Orange Lake since Mr. Solomon earns his living on the lake as a commercial fisherman and bass fishing guide.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Regulation enter a Final Order granting to Celebrity Resorts, Inc., a permit to construct a wastewater treatment facility and spray irrigation disposal system subject to the conditions set forth in the Intent to Issue. RECOMMENDED this 15th day of July, 1991, in Tallahassee, Florida. DIANE K. KIESLING, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of July, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-2722 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Celebrity Resorts, Inc. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 4(1); 5(2); 6(4); 7(5&6); 8- 12(7-11); 13(12); 14(13); 15(14); 16(15&16); 17(17); 18(18); 19-21(20-22); and 22-27(26-31). Proposed findings of fact 1-3 are unnecessary. Proposed finding of fact 28 is subordinate to the facts actually found in this Recommended Order. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Department of Environmental Regulation Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 4-6(1-3); 7-13(5-11); 14(12); 15-17(13-15); 18(17); 19(18); 20-26(19-25); 27-32(26-31); and 33-35(32- 34). Proposed findings of fact 1-3 are unnecessary. COPIES FURNISHED: Delcie J. Suto, Pro Se 2400 N.W. 165th Street Citra, FL 32113 Carol B. Riley, Pro Se 2250 N.W. 165th Street Citra, FL 32113 Crawford Solomon, Pro Se 1303 N.W. 186th Place Citra, FL 32113 Karen English 3680 West Highway 318 Citra, FL 32113 Marilyn Nehring P. O. Box 481 Orange Lake, FL 32112 John Monsees 2400 NW 165 Street Citra, FL 32113 William L. Townsend, Jr. Attorney at Law Post Office Box 250 Palatka, FL 32178-0250 Douglas H. MacLaughlin Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (1) 120.57
# 3
RAYMOND A. JACKSON, ET AL. vs. INDIAN RIVER COUNTY BOARD OF COUNTY COMMISSIONER, 79-002193 (1979)
Division of Administrative Hearings, Florida Number: 79-002193 Latest Update: Apr. 30, 1980

Findings Of Fact By letter dated August 10, 1979, Indian River County (hereafter "County") submitted to the Department of Environmental Regulation (hereafter "Department" or "DER") applications for construction permits for the Gifford Area sewer treatment plant and collection improvements thereto, a domestic wastewater treatment and disposal system located in the County. (DER Exhibits Nos. 1 & 2). After receiving the permit applications submitted by the County, the Department's Orlando District Office requested additional information to determine whether reasonable assurances were provided that the facility would not discharge, emit or cause pollution in violation of Department standards. (Testimony of William Bostwick; testimony of Chancellor; DER Exhibits Nos. 3, 4, 5, 6, 7 & 8). The County, through its consulting engineers Sverdrup & Parcel and Associates, Inc., responded to the Department's requests for additional information. (DER Exhibits Nos. 3, 4, 5, 6, 7 & 8). The Department presented testimony of two professional engineers in its employ, Mr. William M. Bostwick and Mr. Gerald Chancellor, both of whom were accepted as expert witnesses in the field of sewage treatment technology and the processing and evaluation of permit applications for sewage treatment plants. Both witnesses testified that in their expert and professional opinion, based on their review of all plans, test results and other information submitted by the County, the applicant provided the Department with reasonable assurances that the proposed construction and operation of the sewage treatment facility and its collection system would not discharge, emit or cause pollution in violation of Department standards. (Testimony of Bostwick; testimony of Chancellor). The standards applicable to the subject construction permit applications involve (a) treatment level and (b) ambient standards of the receiving waters. The proposed system provides a minimum of ninety (90) percent treatment to incoming wastewaters. Because of the added features of surge tanks, gas chlorination, and dual blowers and motors, the ninety (90) percent minimum treatment was expected to be exceeded. (Testimony of Bostwick; testimony of Chancellor). The secondarily treated effluent from the proposed sewage treatment plant will be dispersed by spray irrigation. Because the effluent is expected to percolate to area groundwaters, the ambient groundwater standards of Section 17-3.101, Florida Administrative Code are applicable. The discharge from the facility will not cause any violation of the groundwater quality standards of the Florida Administrative Code. (Testimony of Bostwick; testimony of Chancellor; testimony of Aront). Although the design of the plant does not contemplate surfacewater discharge, if it did, it would meet the waste load allocation of Indian River County which permits discharge to surfacewaters. When the treated waste leaves the sprinkler head, it will meet secondary water treatment standards. (Testimony of Bostwick; testimony of Chancellor). In the course of evaluating a permit application for a wastewater treatment plant, the Department considers only Chapter 403, Florida Statutes, and its implementing rules and regulations and does not consider local issues relating to zoning, the propriety of expenditure of public funds or the like. (Testimony of Bostwick). There is presently no state standard regulating permissible levels of viruses in effluent discharged to either surface of groundwaters. Large numbers of viruses exist in the effluent discharged from spray irrigation treatment plants which operate at a ninety (90) percent treatment level. The viruses contained in the discharge remain viable as they percolate through the soil. The greatest concern exists when humans are in physical contact with such discharge. However, the present sewage treatment facility in its existing condition is a greater threat to public health than the proposed spray irrigation system. (Testimony of Dr. Welling, Petitioner's Exhibits Nos. 1, 2 & 3). Research concerning viral standards for effluent discharge is in an experimental stage. The Department is examining this question for possible future rule drafting. Neither the federal government nor any state, with the exception of Maryland, has adopted viral standards. (Testimony of Welling) The design of Use Gifford plant contemplates a series of perimeter monitoring wells through which groundwater samples can be attained and tested for compliance with groundwater standards end the presence of viruses. (Testimony of Aront) The plant will spray irrigate effluent at the rate of one (1) inch per week. Although surface run off is not expected, any that occurs due to heavy rains, etc., will be discharged into a perimeter ditch surrounding the plant. The plant design is formulated to retain effluent on site. (Testimony of Chancellor). There are four (4) different types of soil on the site with a water permeability of moderately rapid to very rapid. These soils have a percolation rate which makes the site suited for the intended purpose provided surface drainage is obtained. On a conservative basis the site could accept up to fourteen (14) inches of water per day or ninety-eight (98) inches per week. (Testimony of Connell; testimony of Eng; DER Exhibit No. 6). The parties stipulated prior to the hearing to the following: The project complies with local zoning laws; and The applicable provisions of law are Sections 403.086, 403.087, 403.088, Florida Statutes, and Rules 17-3.091, 17-4.03, 17-4.07 and 17-4.26, Florida Administrative Code.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That the Department issue a construction permit to the County on condition that sample effluent from the monitoring wells on the subject facility be regularly analyzed for compliance with Department rules and the existence of infectious viruses. DONE and ENTERED this 3rd day of March, 1980, at Tallahassee, Florida 32301. SHARYN SMITH Hearing Officer Division of Administrative Hearings 101 Collins Building Tallahassee, Florida 32301 COPIES FURNISHED: Sherman N. Smith, Jr., Esquire Post Office Box 1030 Vero Beach, Florida 32960 George G. Collins, Jr., Esquire Post Office Box 3686 Vero Beach, Florida 32960 Segundo J. Fernandez, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57403.086403.087403.088
# 4
DEPARTMENT OF ENVIRONMENTAL PROTECTION vs JOHN J. D`HONDT, 06-002235 (2006)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Jun. 22, 2006 Number: 06-002235 Latest Update: May 15, 2007

The Issue Whether Respondent, John J. D'Hondt, as a licensed operator, should be disciplined for violations of Florida Administrative Code Rule 62-602.650(2), (4) and (4)(f).

Findings Of Fact Based upon the testimony and evidence received at the hearing, the following facts were established by clear and convincing evidence: Petitioner is the State agency vested with the responsibility of regulating Florida's air and water resources, administering Chapter 403, Florida Statutes (2006), and the rules promulgated in Florida Administrative Code Rule Chapter 62. Petitioner has the statutory authority to establish qualifications; examine and license drinking water and domestic wastewater treatment plant operators and to place an operator on probation; and issue, deny, revoke, or suspend an operator's license pursuant to its rules. Respondent is the owner, supplier of water, and licensed operator of the Double D Mobile Home Ranch's drinking water and domestic wastewater treatment plants located in Volusia County, Florida. He holds Certified Operator Drinking Water License No. 0000542 and Certified Operator Wastewater License No. 0006032. The Volusia County Health Department is a county health department that has been approved by Petitioner pursuant to Subsection 403.862(1)(c), Florida Statutes (2006), to enforce Chapter 403, Florida Statutes (2006), and the rules promulgated for the State's drinking water program for Volusia County. As a result of not having received Respondent's September 2004 MOR, by letter dated October 20, 2004, the Volusia County Health Department notified Respondent that MORs were to be submitted to the Volusia County Health Department by the tenth of the month following the month of operation. The November 2004 MOR was to have been submitted to the Volusia County Health Department by December 10, 2004. Respondent signed and dated the November 2004 MOR on December 12, 2004; it was received by the Volusia County Health Department on December 27, 2004. The December 2004 MOR was to have been submitted to the Volusia County Health Department by January 10, 2005. On February 4, 2005, Respondent was sent a late reporting violation letter stating that the December 2004 MOR had not been received. This letter again reminded Respondent that MORs were to be submitted within ten days after the month of operation. The December 2004 MOR was received on February 11, 2005. The April 2005 MOR was to have been submitted by May 10, 2005. Respondent signed and dated the April 2005 MOR on May 17, 2005. It was received on May 27, 2005. The September 2005 MOR was to have been submitted by October 10, 2005. It was received on October 18, 2005. The November 2005 MOR was to have been submitted by December 10, 2005. It was signed and dated December 14, 2005, and received on December 19, 2005. Respondent did not timely submit MORs for the months of November 2004, December 2004, April 2005, September 2005, and November 2005. In 2004, the Volusia County Health Department inspected the Double D Mobile Home Ranch's drinking water treatment plant and found that Respondent maintained a combined logbook for the drinking water and domestic wastewater treatment plants. Respondent was informed that he was required to keep a separate operation and maintenance logbook for each of the drinking water and domestic wastewater treatment plants. On August 10, 2004, Petitioner inspected the Double D Mobile Home Ranch's domestic wastewater treatment plant and found that there was a combined logbook for the drinking water and domestic wastewater treatment plants. Respondent was again informed that he was required to keep separate logbooks for each plant. A non-compliance letter dated October 12, 2004, and a copy of the August 10, 2004, inspection report were sent to Respondent informing him that he needed to separate his operation and maintenance logbook. In 2005, the Volusia County Health Department inspected the Double D Mobile Home Ranch's drinking water treatment plant and found that Respondent still maintained a combined logbook for the drinking water and domestic wastewater treatment plants. During the inspection, Respondent was again informed that he was required to keep a separate operation and maintenance logbook for the drinking water and domestic wastewater treatment plants. On June 15, 2005, Petitioner inspected the Double D Mobile Home Ranch's domestic wastewater treatment plant and again found that Respondent was keeping a combined logbook for the drinking water and domestic wastewater treatment plants. During this inspection, Respondent was again informed that he was required to keep separate logbooks. A non-compliance letter and a copy of the June 15, 2005, inspection report were sent to Respondent again informing him that he was required to maintain separate logbooks for the drinking water and domestic wastewater treatment plants. On February 13, 2006, the Volusia County Health Department inspected the Double D Mobile Home Ranch's drinking water treatment plant and found that Respondent still maintained a combined operation and maintenance logbook for the drinking water and domestic wastewater treatment plants. During this inspection, Respondent was again informed that he was required to maintain a separate logbook for each plant. Over the extended period reflected by the inspections cited in paragraphs 11 through 15, Respondent failed to maintain separate logbooks for the operation and maintenance of the Double D Mobile Home Ranch's drinking water and domestic wastewater treatment plants. On August 10, 2004, Petitioner inspected the Double D Mobile Home Ranch's domestic wastewater treatment plant and found that the logbook did not contain sufficient entries of the performance of preventative maintenance and repairs or request for repairs of equipment. During this inspection, Respondent was informed that he was required to keep adequate entries of preventative maintenance and repairs or request for repairs of equipment for the domestic wastewater treatment plant. A non-compliance letter and a copy of the August 10, 2004, inspection report were sent to Respondent informing him that he was required to maintain entries of the performance of preventative maintenance and repairs or request for repairs of equipment for the domestic wastewater treatment plant. On June 15, 2005, Petitioner inspected the Double D Mobile Home Ranch's domestic wastewater treatment plant and again found that Respondent was not keeping adequate entries of the performance of preventative maintenance or repairs for the domestic wastewater plant. During this inspection, Respondent was again informed that he was to keep such entries. A non-compliance letter and a copy of the June 15, 2005, inspection report were sent to Respondent informing him that he needed to maintain such entries for the domestic wastewater treatment plant. Photocopies of the combined logbook have essentially no entries for the performance of preventative maintenance or repairs or requests for repairs to a domestic wastewater treatment plant. Infrequent margin notes are not decipherable and do not differentiate between the two activities.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the licenses of John J. D'Hondt, as a Certified Operator Drinking Water and a Certified Operator Wastewater, be disciplined as set forth in the "probation" letter of March 15, 2006. DONE AND ENTERED this 13th day of February, 2007, in Tallahassee, Leon County, Florida. S JEFF B. CLARK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 2007. COPIES FURNISHED: Ronda L. Moore, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John J. D'Hondt 2 Tropic Wind Drive Port Orange, Florida 32128 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Michael W. Sole, Secretary Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, Acting General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (6) 120.569120.57403.061403.862403.867403.876
# 5
JOHN E. PILCHER, PHYLLIS REPPEN, ET AL. vs BAY COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 90-000254 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 16, 1990 Number: 90-000254 Latest Update: Jan. 10, 1992

Findings Of Fact During 1990, Respondent/Applicant, City of Lynn Haven, filed several applications with the Respondent, Department of Environmental Regulation, seeking the issuance of several permits to build a wastewater collection system and a two million gallon per day advanced wastewater treatment (AWT) plant. The proposed facility is intended to replace the wastewater treatment facility currently being used by the City of Lynn Haven. After a review of the applications the Department proposed several Intents to Issue covering the different aspects of the proposed projects. The Intents to Issue included: A) a variance and dredge and fill permit, pursuant to Sections 403.201, 403.918, 403.919, Florida Statutes, and Rule 17-312, Florida Administrative Code, authorizing a subaqueous crossing of North Bay (Class II waters) and installation of a force main (permit #031716641), B) a collection system permit, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-600 and 17-604, Florida Administrative Code, for the installation of approximately 11 miles of pipe from North Bay to the proposed treatment plant, C) a dredge and fill permit #031785181, pursuant to Sections 403.918, 403.919, Florida Statutes, and Rules 17-4, 17-312, Florida Administrative Code, authorizing 10 incidental wetland crossings associated with the collection system, and, D) a construction permit #DC03-178814, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-302, 17-600 and 17-611, Florida Administrative Code, authorizing the construction of a 2.0 mgd wastewater treatment plant. Sand Hill Community Improvement Association challenged the Department's Intents to Issue. The Sand Hill Community Improvement Association (Sand Hill) is an association composed of 74 formal members plus numerous supporters. Both members and supporters are residents who live near the site of the proposed Lynn Haven sewage treatment plant. They are sufficiently close to the plant site that construction of the proposed project could impact their property. The members are very concerned about any threat of pollution to the aquifer from the proposed plant since all of the members are dependent on private wells for their drinking water. Additionally, members of the association use the proposed site, as well as the associated wetlands, Burnt Mill Creek and the nearby lakes, for a variety of recreational purposes, including hunting, fishing, hiking, bird-watching, boating and swimming. Given these facts, the Association has standing to challenge the Department's Intents to Issue involved in this case. The City of Lynn Haven is located on a peninsular section of the south shore of North Bay and, except for its connection to the land, is surrounded by environmentally sensitive Class II or Class I waters. Lynn Haven's existing wastewater treatment plant was poorly designed, has not worked properly, and is old and outdated. The plant is permitted to treat up to 950,000 gallons per day. However, the existing plant is currently exceeding its originally permitted treatment limits and is treating in excess of 1,200,000 gallons per day. The sewage only receives secondary treatment, Secondary treatment is the minimum state standard for wastewater treatment. The secondarily treated wastewater is pumped several miles to a spray irrigation site located in the eastern portion of the City. The sprayfield site has never worked properly due to a high groundwater table and a confining layer of soil, both of which prevent the effluent from percolating into the ground. Because the sewage effluent cannot percolate into the ground, the existing operation frequently results in direct runoff into a ditch which empties into North Bay, a Class II waterbody. Such discharge of wastewater effluent into Class II waters is prohibited by Department regulations. 1/ At this time, the existing wastewater treatment facility is in violation of both DER and EPA standards and is under enforcement action by both agencies. The existing facility is currently operating without a permit and the Department has advised Lynn Haven that the existing facility as it now operates can not be permitted. In fact, all the parties agree that the City is in serious need of a wastewater treatment facility which works and does not pollute the environment. However, the parties disagree over the method by which proper wastewater treatment could be accomplished by Lynn Haven. Since 1972, the City, through various consultants and with the aid of DER, has reviewed approximately 40 alternatives for wastewater disposal. After this review, the City of Lynn Haven selected the alternative which is the subject of this administrative hearing. The alternative selected by the City of Lynn Haven consists of the construction of a proposed advanced wastewater treatment (AWT) plant and distribution system. The new plant will be on a 640 acre parcel of property located approximately 12 miles north of Lynn Haven. The location of the new plant will necessitate the rerouting of the wastewater from the old plant to the new plant by construction of a new transmission line approximately 12 miles north of the City across North Bay and parallel along State Road 77. 2/ The treatment process proposed for use in the new AWT plant is known as the AO2 process. The process is patented. The AO2 treatment process primarily consists of biological treatment with settling and filtration. The treatment process also includes a chemical backup treatment to further reduce phosphorus if necessary. The evidence demonstrated that this type of facility has been permitted by the Department in at least five other wastewater facilities throughout the state. The treatment facility will have a two million gallon per day, lined holding pond on site for the purposes of holding improperly treated wastewater for recirculation through the proposed facility. Any excess sludge generated by this treatment process would be routed to lined, vacuum-assisted, sludge drying beds. The sludge would then be transported offsite to a permitted landfill for disposal. The evidence demonstrated that this treatment process would not produce any objectionable odors. Once the wastewater is treated, it will be disinfected by chlorination to eliminate pathogens. The chlorination process is expected to meet state standards. After chlorination, a dechlorination process would occur to remove any chlorine residuals which would have a harmful affect on the environment. The treated wastewater would then be re-aerated and discharged through the distribution system indirectly into a wetland located on the 640 acre parcel of property. The quality of the treated wastewater is expected to meet the advanced wastewater treatment (AWT) standards. These standards are five milligrams per liter total suspended solids (T.S.S.), five milligrams per liter BOD, three milligrams per liter nitrogen (N), one milligram per liter phophorus (P). Ph will be in the range of six to eight units on an average annual basis and can be adjusted up or down if necessary to meet the ph levels of the ecology into which the wastewater ultimately flows. This effluent quality is approximately five times cleaner than secondarily treated effluent. Additionally, as a condition of the draft permit, the proposed facility would be operated by a state-licensed operator and would be routinely monitored to insure that the treated wastewater effluent meets advanced wastewater treatment standards. Given these facts, the evidence demonstrated that the applicant has supplied reasonable assurances that the plant will perform as represented and that the effluent will meet the state standards for advanced wastewater treatment. As indicated earlier, the site for the proposed AWT plant contains approximately 640 acres and is located approximately 12 miles north of Lynn Haven in an area known locally as the Sand Hills. The City specifically purchased this parcel of property for the construction of the proposed wastewater treatment plant. The plant itself would be located in the northeast corner of the property. The 640 acre site was previously used for silviculture. The entire area is currently planted in pines except for a low area that is dominated by a pristine, woody wetland system of titi. The titi wetland is approximately 212 acres in size and generally runs through the center of the property from the northeast to the southwest. The wetland is low in acidity, with an estimated ph between 4 and 5. The site consists of hilly, mineralized soils. The soils within the forested wetland are organic in nature. Based on the evidence at the hearing, there does not appear to be any significant confining layers of soil which would prevent the treated wastewater from percolating in the soils and draining towards the wetland and ultimately into Burnt Mill Creek, a Class III waterbody. Once the effluent leaves the plant, it would go through a distribution system. The proposed distribution system will consist of six, 500 foot long, 12 inch diameter perforated pipes. Each 500 foot section of pipe has 100 one and one-half inch orifices which will discharge the treated effluent onto an eight foot wide concrete pad. This concrete pad will dissipate the effluent's energy, prevent erosion at the orifice site and insure that the effluent sheetflows onto and eventually into the sandy soils of the plant site and ultimately into the receiving wetland. The distribution pipes are located around the east, north and western portions of the receiving wetland and are variously set back from the receiving wetland approximately 80 to 200 feet. The distribution system is designed with valves to allow for routing of flow to different branches of the system if it is determined through long term monitoring that there is a need to allow for any of the receiving wetland to dry out. None of the distribution branches are located in any jurisdictional wetlands of the State of Florida. The receiving wetland will receive a hydraulic loading rate of approximately 1.8 inches per week once the new advanced wastewater treatment plant is operating at capacity. Both the surface waters and groundwaters on the 640 acre parcel flow from northeast to southwest across the property. The evidence clearly demonstrated that any treated wastewater discharged on the site would move down hill by surface or groundwater flows towards the wetlands in the central portion of the property and eventually discharge into Burnt Mill Creek located at the southwest corner of the parcel. The evidence demonstrated that it would be highly unlikely for the surface or groundwater to move in any other direction and would be unlikely for the surface or groundwater to move towards any residents located to the north or east of this parcel. Evidence of the topography and its relatively sharp gradient clearly demonstrated that the treated wastewater discharged in the northeast corner of this site would not result in any significant still water ponding and would exit the site at the southwest corner of the property in approximately 14 hours. The evidence did demonstrate that, depending on the wetness of the weather, there may likely be certain times of the year when a flowing type of ponding would occur. However, this wet weather ponding was not shown to be of a duration which would impact to a significant degree on the flora and fauna of the area or increase the number of disease bearing mosquitoes in the area. As indicated earlier the treated effluent from the proposed AWT plant will flow into Burnt Mill Creek. Burnt Mill Creek will ultimately carry the treated wastewater approximately 11 miles down stream to North Bay. The City can directly discharge up to two million gallons per day of AWT water into Burnt Mill Creek without violating state water quality standards. Therefore, the volume of wastewater discharged into Burnt Mill Creek should not have significant impacts on surface and ground water quality. Moreover, Chapter 17-611, Florida Administrative Code, authorizes the discharge of up to 2 inches per week to receiving wetlands provided wastewater is treated to AWT standards. The evidence demonstrated that this rule was developed as an experimental effort to determine if wetlands could be appropriate areas for wastewater effluent to be either discharged or treated. These state limits were intended to be very conservative limits and were designed to insure that the impacts to receiving wetlands would be minimal. The evidence and testimony demonstrated that the receiving wetland system involved in this case should not be adversely impacted beyond those limits set forth in Section 17-611.500, Florida Administrative Code, for flora, fauna, macroinvertebrates, fish or vegetation and will meet all standards set forth in Chapter 17-611, Florida Administrative Code. However, it should be noted that the wetland/wastewater program is highly experimental and very little is known about the actual impacts of wetland/wastewater systems since facilities similar to the one proposed by Lynn Haven have not yet been placed in service. The evidence did show that there would be some long term impacts to flora and fauna in the wetland area primarily due to ponding, changed ph and the introduction of nutrients and pollution in the form of the effluent. However, the regulation does allow for some change within a receiving wetland and the evidence did not demonstrate that these changes would be significant or detrimental. Petitioners' own witness concluded that other deep wetland treatment systems are doing a very good job in meeting state water quality standards. Although Petitioners' expert noted potentially adverse impacts to flora and fauna from other wastewater treatment systems, these other systems were slow moving, impoundment-type systems that are not similar to the wastewater/wetlands system proposed by the City of Lynn Haven. The Lynn Haven system is designed for percolation and sheetflow, not ponding. Though there should be some expected changes, no evidence was provided that the receiving wetlands for the Lynn Haven facility would be affected to the extent there would be violations of any standard as set forth in Chapter 17-611, Florida Administrative Code. In essence, the legislature has determined that such experimentation with wetland areas is appropriate, albeit, even with the conservative limits of DER's rule, may prove to be a mistake. This facility is designed to fit within that rule and in fact is probably the best technology available for use in a wetland/wastewater situation. Finally, in order to avoid any potential impacts on the area which may over time become significant an approved monitoring program for surface water quality and affects on flora and fauna, as well as a groundwater monitoring program are required as conditions of the permit. The groundwater monitoring program has been designed to monitor any potential long term impacts to groundwater. With these protections there should not be any significant adverse impacts to surface or groundwater quality and the applicant is entitled to a construction permit for the AWT plant and distribution system. Lynn Haven's sewage would reach the proposed AWT plant through a transmission line. The transmission line would run from Lynn Haven's existing wastewater treatment plant across North Bay and through the unincorporated area of South Port. The Southport area is not sewered and utilizes individual septic tanks for its sewage. The transmission line would be constructed entirely in state road right-of-way. The line would terminate at the 640 acre site described above. A new, variable speed pumping station would be constructed adjacent to the old wastewater treatment plant. From this pump station, a 24 inch line would be constructed on City right-of-way up to the south shore of North Bay. At this point, the transmission line would be reduced in size to 20 inches and would be embedded approximately three feet below the Bay bottom. An additional variable speed pumping station would be located approximately half way along the 12 mile route of the transmission line to insure adequate pressure to pump wastewater to the new wastewater treatment plant. The pumps are to be employed to insure that the wastewater is continuously pumped uphill to the new site so that waste does not set, become septic, and create odor problems. The pumps are equipped to provide for chemical control of odor if necessary. Also, as a condition of the permit, the pumping stations are required to have backup power supplies should power be lost to the stations. The pumping stations and backup power supplies are to be tested monthly and the pumps are required to be continuously monitored by radio telemetry to insure they are operating properly. Additionally, the City of Lynn Haven will be required, as a condition of the permit, to visually inspect the entire length of the wastewater transmission line three times per day. The portion of the transmission line which would cross North Bay is approximately 3000 feet in length and would be constructed of high density polyethylene pipe (HDPE) with a wall thickness of one and one-half inches. HDPE pipe is used to transport materials such as hazardous wastes where leakage is not permissible. This type of pipe is virtually inert in that it is highly resistant to corrosion and other chemical reactions. It is also impact resistant and has a very high tensile strength. The pipe comes in 40 foot segments and is heat welded (fused) together. This type of joint significantly reduces the chance of any leakage. In fact, leakage around pipe joints is more likely to occur with other types of pipe and pipe connections. HDPE pipe is currently carrying wastewater across Watson Bayou in Bay County, Florida. 3/ There have been no reported problems with leaks or breaks occurring in the pipe crossing Watson Bayou. Given these facts, the probability of the proposed HDPE pipe leaking or breaking is extremely low, albeit not impossible, and such pipe appears to be the best material available for constructing a wastewater treatment transmission line across protected waters of the State. As a condition of the construction permit, the portion of the transmission line crossing North Bay will be required to have isolation valves at each end so that the pipe may be completely isolated in the event that it needs repair. The underwater portion of the line would be visually inspected by a diver twice per year and the line would be pressure tested before being placed into service. Additionally, pressure tests would be performed once a year. The construction permit also requires Lynn Haven to periodically inject dye into the proposed transmission line to check for any small leaks that may not otherwise be detected. Finally, the HDPE pipe would also be equipped so that television cameras could be inserted into the pipe to routinely inspect the interior of the pipe. In the event the HDPE portion of the transmission line would need to be repaired, the line could be immediately, temporarily repaired by a dresser coupling. A permanent repair could then be made in less than 24 hours once the material and equipment were staged at the site. The City intends to locally stockpile all necessary parts and equipment to effect any required repair to prevent any delay beyond four days. Permanent repairs would be accomplished by floating the line to the surface. The area needing repair would be cut out and a new section would be put in place by heat fusion. The line would then be pressure tested to insure the absence of leaks and placed back into service. During this process, the line would be taken out of service by the isolation valves and flow would be diverted to the eight million gallon holding ponds at the City of Lynn Haven's existing facility. These holding ponds can hold four days worth of wastewater from the City of Lynn Haven. Lynn Haven is required, as a condition of the construction permit, to have this reserve capacity as well as have a contractor on standby to make any repairs in the event such repairs are necessary. All of the technical specifications for the transmission system and the operating conditions imposed on it are designed to insure that the system does not fail or develop any leaks which could impact receiving waters, including North Bay. Given the permit conditions, the required inspections for leaks, the sound engineering design and quick repair methods proposed, the evidence demonstrated that the probability of any leak occurring in the portion of the transmission line crossing North Bay is extremely low and that if such a leak does occur any potential harm to the environment will likely be limited and quickly eliminated. The evidence demonstrated that the design of the transmission line and permit conditions provide reasonable assurances that the transmission line will meet or exceed the Department standards set forth in Chapter 17-604, Florida Administrative Code. Therefore, the applicant has provided reasonable assurances that the transmission line/collection system will not violate Department standards or rules and the applicant is entitled to a permit (permit #CS03-178910) for the proposed collection system. In addition to requiring a construction permit/collection system permit for the wastewater transmission line, the line will also require dredge and fill permits and a variance for crossing waters of the state. There are ten incidental crossings of state waters and one major crossing o f North Bay. Of the ten incidental crossings, two are over small creeks (Scurlock and Little Burnt Mill) These two incidental creek crossings will be accomplished by placing the transmission line (ductile iron pipe) on top of pilings placed in the water. Best management practices such as turbidity curtains and other erosion control practices are proposed and required by the permit to minimize construction impacts on water quality. The only impacts to wetland resources would be from the placement of the pilings. The evidence demonstrated that any impact would be minimal and not significant. The evidence did not demonstrate that the aerial crossings would have any long term water quality or environmental impacts. The remaining eight incidental crossings of waters of the state consist of small, seasonally wet ditches which would be traversed by trenching and burying the transmission line. Again, turbidity controls such as curtains and hay bales would be employed to protect water quality. The evidence did not demonstrate that any significant long term or short term impacts to resources of the state would occur. The evidence did demonstrate that the applicant has provided reasonable assurances that water quality standards would not be violated in regards to these 10 incidental water crossings. Likewise, the evidence demonstrated that the construction of these 10 incidental water crossings would not be contrary to the public interest. Therefore, the applicant is entitled to issuance of a dredge and fill permit (permit #031785181) for these 10 water crossing. However, a much harder question arises in relation to the dredge and fill permit and the variance required for the 3,000 foot segment of the wastewater transmission line which crosses North Bay. Pursuant to Rule 17- 312.080(7), Florida Administrative Code, permits for dredging and filling activity directly in Class II waters which are approved for shellfish harvesting by the Department of Natural Resources (DNR) shall not be issued. The reason for the rule is that any pollution caused by dredging and filling and, as in this case, the permanent placement of a sewage pipe in food producing waters could potentially have catastrophic effects on more than just the environment but on local employment in the shellfish industry and the quality of food available to the State. Put simply, the Department has determined by enacting its Rule that the public interest in food producing waters far outweighs any other consideration or criteria under Sections 403.918 and 403.919, Florida Statutes, in determining whether dredging and filling should take place in Class II, shellfish waters. In other words, it is not in the best interest of the public to allow dredging and filling so that a pipe carrying raw sewage can be placed in shellfishing waters. However, irrespective of this determination, the Department believes that, pursuant to Section 403.201(1)(c), Florida Statutes, it may grant a variance from its rules to relieve a hardship. As indicated earlier, North Bay is a Class II waterbody, conditionally approved for shellfishing. North Bay, therefore, falls within the Rule's prohibition against dredging and filling in Class II waters and the City is required to demonstrate the presence of a hardship in order to vary the Rule prohibition and obtain a dredge and fill permit for the North Bay crossing. On issues involving variances, the Department employs a two step analysis. The first part of the analysis is whether a hardship is present and the second is whether, if the variance were granted, would it result in permanent closure of Class II shellfish waters. The Department correctly recognizes that the question of whether a hardship exists is a question of fact and is determined on a case-by-case basis. Surprisingly, in a kind of "what we don't know can't hurt" posture the Department reviews a request for a variance standing alone based on the application as it is presented and does not require analyses of other possible alternatives to the granting of a variance. However, the existence of any alternatives, costs of any alternatives, timeliness of any alternatives, problems with any alternatives, whether an alternative represents a short term or long term solution to a given problem and the implementability of any of the alternatives are all factors utilized by the Department in determining whether or not to grant a variance. The Department's policy of non- review makes no sense, either factually or statutorily, when the Department is faced with varying a prohibition it created in its own rules. Similarly, the Department's policy of not requiring other alternatives to be examined before granting a variance goes against the fact that an applicant has the burden to establish entitlement to a permit and, in the case of a hardship variance, that a hardship exists because reasonable alternatives to granting a variance are not available. 4/ Likewise, the second part of the Department's hardship analysis relating to the permanent closure of shellfishing waters makes no sense given the fact that a non-permanent closure of shellfishing waters may have the same or just as serious effect on employment in the shellfishing industry, the loss of income due to an inability to earn a living in that industry and health risks posed by contaminated seafood. Temporary loss of income or a livelihood can, for all practical purposes, have consequences to the persons directly affected by a temporary closure of shellfishing waters similar in nature those caused by the permanent closure of shellfishing waters. The same can be said for health risks posed by a contaminated food supply. Rule 17-312.080(7), Florida Administrative Code, does not contain any exceptions for the temporary closure of shellfish waters. Nor is the rule limited to instances of permanent closure. Permanent closure is simpy not required in order to support a hardship under Section 403.201, Florida Statutes. Moreover, neither step in the Department's two-step analysis is included in any Rule promulgated by the Department. 5/ Without such a Rule, it is incumbent upon the Department or the applicant to demonstrate the underpinnings for this non-rule policy. No such evidence was presented at the hearing. In fact, the evidence presented at the hearing affirmatively demonstrated that the Department's non-rule policy violated both its own rules and the statute under which it is trying to proceed. As indicated, the issue of hardship is a question of fact and involves a weighing of all the facts and cicumstances involved in this project. In this case, there are shellfishing areas located close to the proposed location of the transmission line. North Bay is sometimes closed to shellfish harvesting by the Department of Natural Resources. These closures generally occur during wet weather conditions and are due to stormwater runoff and the failure of septic tanks in Southport. 6/ Additionally the current Lynn Haven system also contributes to the closure of North Bay. No competent, substantial evidence was provided that issuance of the permit and variance would result in the permanent closure of shellfish waters. The location of the proposed transmission line would be several hundred feet west of the Bailey Bridge embedded in the Bay floor. 7/ The proposed alignment of the transmission line through North Bay is in an area which is relatively biologically unproductive. The proposed placement of the transmission line avoids the few grassbeds that exist in the nearshore shallow areas except for approximately 200 square feet of grass. During construction of the line, these grasses would be removed immediately before the line is placed in a trench and then would be promptly replanted in the same area. The evidence demonstrated that the affected areas of grass should be able to reestablish itself. The evidence further demonstrated that there would not be any long term adverse impacts to these aquatic resources and there should not be any significant long term impacts on the balance of any aquatic life which may exist on the bay bottom. Water quality during construction will be protected by use of turbidity controls to control sediments. Therefore, any short term impacts on aquatic resources are likely to be insignificant. Concerns about long term adverse impacts to Class II waters are greatly reduced by the type of pipe and conditions in the permit which require that the transmission line be routinely inspected and tested to insure that there is no leakage and that in the unlikely event the line should need to be repaired, the line could be easily isolated and quickly repaired. The evidence showed that, to completely avoid Class II waters, the line could be moved several miles to the west or east of the line's proposed location or be placed over or under the Bay. If the line was moved west to the extent that it was in Class III waters, it would be over 40 miles long and would more than double the cost of the project. If the line was moved several miles to the east, it would go through the Deer Point Lake Watershed. The watershed is a Class I water supply for Bay County. Clearly, moving the line either west or east is not practical nor realistically feasible. Tunneling under North Bay would be very risky and is not technically feasible. The length of the tunnel would require steel pipe to be used. If tunneling could be done at all steel pipe would not provide the level of protection afforded by the HDPE pipe proposed by Lynn Haven. Placing the transmission line on pilings for an aerial route over North Bay is uneconomical and would create a potential hazard to navigation. Moreover, an aerial crossing would not solve any pollution problems should the transmission line leak or break and would also still involve a variance request since it would be necessary to dredge and fill in Class II waters for the placement of pilings or supports. Put simply, the evidence, showed that there was no realistic way to avoid Class II waters in North Bay given the location of the proposed wastewater treatment facility. A location which the City knew would require a hardship variance from the rule prohibition of dredging and filling in Class II, shellfishing waters. A hardship which the City created by site selection and which it hoped to overcome by strenuous permit conditions and futuristic speculative benefits to unsewered areas of the County. The existing treatment facility is operating in violation of both EPA and DER requirements, has been issued a notice of violation, is nonpermitted and is destined to be operating under a consent order. The system is hydraulically overloaded, handling approximately 1.2 million gallons per day while its rated capacity is 950,000 gallons per day. Refurbishing Lynn Haven's existing wastewater treatment facility would not be viable since the plant has outlived its useful life, is of a very poor design and probably could not be made to function within Departmental standards and water quality standards. The existing sprayfield does not function and results in overland flow of effluent which discharges to Class II waters. The high water table and presence of a semiconfining layer on the Lynn Haven peninsula virtually guarantee such discharges. Further, the plant only provides secondary treatment. Put simply, Lynn Haven needs another method of handling its sewage. The only remaining alternative to a Bay crossing is to tie into the existing Bay County system and any AWT wastewater treatment plant Bay County may build in the future. 8/ The existing Bay County system provides at most only secondary treatment. The Cherry Street facility, which is part of that system, functions essentially as a lift station rather than a treatment facility. The Military Point Lagoon portion of the system is nonpermitted and is operating under a consent order and has been the subject of enforcement action. The Department has an extensive agreement with Bay County requiring a significant and long term series of actions to deal with their wastewater treatment system. The modifications or improvements to the Bay County system to provide advanced treatment are not imminent and the final system conditions cannot now be determined as they will depend in large measure upon data and analysis remaining to be collected. Currently, the existing Bay County system processes a significant amount of industrial discharge and has a problem with phenols most likely due to industrial waste from two discreet industrial facilities in the County. 9/ However, all of Bay County's wastewater system problems are reasonably solvable and will be corrected in the near future, if they have not already been corrected. Additionally, the amount of sewage Lynn Haven would be sending into the current Bay County system probably would not significantly impact that system and its problems or the County's ability to solve those problems. The County is willing to accept Lynn Haven's sewage into its system and future AWT system. The connection into Bay County's system is a viable alternative currently in existence. Moreover, as indicated, Bay County has a long range plan to build an advanced wastewater treatment plant. As yet the plan remains "just a twinkle in the County's eye" and has not progressed to the design stage. However, this plan, of necessity, will eventually become reality in the next 5 to 10 years. The estimated cost to a Lynn Haven user for the Bay County conceptual system will be $25.00 per month in lieu of $15.00 for the proposed Lynn Haven system. These estimates are at best speculative. However, this cost estimate is not excessive given the fact that a Lynn Haven user lives in an environmentally sensitive area and a Bay County hook-up would eliminate the need to run a sewer pipe through food producing, Class II waters. 10/ Based on these facts, the evidence demonstrated that it was feasible for Lynn Haven to hook into Bay County's wastewater system without creating any more environmental impacts than that system is already experiencing and must solve and which, to a significant degree, have already been solved by Bay County. Given the existence of this alternative to crossing food producing waters and the fact that any future benefits are just as likely to be provided just as quickly by the County through AWT facilities, the applicant has failed to demonstrate the necessity for crossing North Bay and failed to demonstrate entitlement to a hardship variance for that crossing. Therefore, the applicant is not entitled to either a dredge and fill permit or variance for the proposed North Bay crossing.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is, recommended that the Florida Department of Environmental Regulation enter a final order issuing permit applications CS03178910, DC03178814, and 031785181, and denying the variance and permit number 031716641. RECOMMENDED this 27th day of November, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1991.

Florida Laws (5) 120.57120.68403.087403.088403.201
# 6
CLASINA VANTHUL vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-002429 (1998)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 28, 1998 Number: 98-002429 Latest Update: Dec. 28, 1998

The Issue Is Petitioner entitled to credit for her answers to any of the questions she specifically challenged or for the four questions deleted by the Department of Environmental Protection (Department) on the February 1998 Class "B" Domestic Wastewater Operator Certification examination (wastewater examination)? Was the Department's administration or grading of Petitioner's examination arbitrary, capricious or otherwise unfair so as to entitle Petitioner to either additional points for a passing grade or an opportunity to retake the examination without cost?

Findings Of Fact Petitioner took the Class "B" wastewater operator certification examination given in February 1998 by the Department of Environmental Protection. Pilot questions are questions submitted by licensees and educators which do not yet have a "performance record" of testing validity. Petitioner alleged that pilot questions were used on her examination contrary to rules of the Department. Petitioner submitted no competent evidence to establish this allegation and it was credibly refuted. There are no pilot questions in the bank of potential questions from which the examination was composed. Petitioner conjectured that questions on her "B" level examination may have been drawn from a bank of questions for a higher level ("A") certification examination. In fact, the examination questions for the "B" level examination were selected from a bank of questions developed by the Department of Business and Professional Regulation. The Department of Business and Professional Regulation was the agency that had jurisdiction over the operator certification program before the Department of Environmental Protection assumed responsibility therefor. The selection of the examination questions was accomplished by selecting the percentage of questions from a range in a subject area already predetermined by rule and a computer program inserting the number of questions to fill that percentage. There is no way the computer program can select questions from another level of examination, for instance "A" level or "C" level. Prior to the examination, candidates for examination were advised they would have four hours to complete the examination. Examinees for the February 1998 examination in fact were provided four full hours after all preliminary matters and reading of instructions were completed. Prior to the examination, the Department provided candidates for examination with a list of subject areas that it intended to place on the examination, so that candidates could effectively prepare. All subject areas, except one, were in fact covered on the February 1998 examination. In some instances, a single question/answer satisfied two or more subject areas because of content equally applicable to each subject area. In other instances, the same subject area was covered by several questions/answers. Only one subject area that was listed in the pre-examination information did not appear on the February 1998 examination. That subject area was "energy." The reason that the subject area of "energy" was not included on the February 1998 examination was that there were no energy questions in the bank of questions which the Department of Environmental Protection had inherited from the Department of Business and Professional Regulation. The sole result of the absence of any energy question on the examination is that Petitioner and all other examinees in her group did not receive as thorough an examination in a single subject matter area as the licensure board had aspirationally intended. However, all examinees were equally treated. Originally, there were 87 questions on the February 1998 examination. After the examination was administered and a special analysis report on the grades was produced, the Department's examination review committee met with the examination consultants. The committee recommended to the Department, and the Department accepted the recommendation, that four questions should be deleted because they were misleading or for some other reason failed to adequately and reliably measure the examinees' ability to practice at a Class "B" license level. Removal of the four questions only lowered the mean score by one point, thereby creating a slightly easier examination while simultaneously slightly increasing its reliability. Examinees were instructed to select the best multiple choice answer for each question. Each of the questions was equally weighted. The Department interpreted Rule 61E12-41.005(5), Florida Administrative Code, as requiring that examinees achieve at least a 65% rounded score on the examination in order to pass the examination. In order to determine an examinee's success on the examination, the Department multiplied the initial 87 questions by 65% (.65) and so determined that an examinee would need at least 54 correct questions/answers to earn a passing grade. In determining a candidate's grade on an operator licensure examination, the Department determines the number of correct answers needed to reach the minimum rounded score of 65%. A special analysis report also indicates how many correct answers equal each percentage grade. If this number is not a whole number, the Department uses the rounding method to reach a whole number, based on 0.5 +/- percentage. By the foregoing grading interpretation, before deletion of the four questions, Petitioner's rounded score was 60%, with 52 correct answers. Petitioner's grade improved with the deletion of the four questions, because she had incorrectly answered each of the four questions which were later deleted. After the four questions were deleted, the same grading system resulted in a rounded score of 63% with 52 correct answers. By letter dated April 6, 1998, the Department notified Petitioner that she had failed the examination because she did not get a rounded 65% score based on 52 correct answers. After receiving the letter, Petitioner requested a review of the examination. Petitioner was allowed to review the questions and answers she had missed. Petitioner was also allowed to write comments on the question sheets which she reviewed. Petitioner's comments were submitted to the examination review committee of the Department for the committee's review. Upon review of Petitioner's comments and the examination, the committee determined that the questions and required answers were accurate and fair. It recommended no change to Petitioner's score. Petitioner was notified that no change would be made to her score. Petitioner then timely requested an administrative hearing. Although Petitioner's two letters/petitions (see Preliminary Statement supra.) initially raised issues concerning a number of examination questions, Petitioner only presented evidence concerning the contents of question 78 at formal hearing. Question 78 tested examinees' knowledge of appropriate emergency response activity and notification concerning the release of chlorine gas. Petitioner asserted that question 78 was vague, ambiguous, and misleading because it did not specifically state that a "reportable quantity" was to be considered in choosing the best answer from among multiple choice options of reporting a chlorine spill to one entity, two entities, three entities or no entities. For this reason, Petitioner alleged that her answer could have been an answer which was equally correct ("multi- keyed") with the answer selected as correct by the Department. Mr. Dawkins, who was accepted as an expert in emergency response and community right-to-know, testified that the question was not misleading. Mr. Dawkins is not associated with the Respondent Department, any of its committees, or the examination preparation process. He oversees actual reportage of dangerous chemical spills for the Department of Community Affairs. Although Mr. Dawkins indicated that he, personally, would not have written question 78 quite the way it was posed on the examination, he still felt that since it addressed reporting requirements, examinees should have assumed that a reportable quantity was involved and answered accordingly. All three of Respondent's experts testified that the answer chosen as correct by the Department was the most accurate of the multiple choice answers provided on the examination and that the subject matter and correct answer should have been understood by a qualified operator of a wastewater treatment plant at the "B" licensure level. The Department has under contract an expert in examination and psychometrics. The Evaluation Services Instructional Support Center Learning Systems Institute of Florida State University provides to the Department as part of the examination grading, a special analysis report for each examination. This report contains statistics about the scores, difficulty of each question, and how the spread of answers by the examinees compared to the four quadrants of grade results. The February 1998 examination was an extremely difficult examination, as evidenced by the fact that more examinees failed than passed. However, it was demonstrated that 77% of examinees who took the examination got question 78 correct. Question 78 also discriminated between high and low scoring examinees. The item analysis performed before the other four questions were deleted did not show that question 78 was misleading in any way, but did show that each of the four questions deleted were misleading or otherwise flawed. One of the proctors for the February 1998 examination personally observed that at the time the examination ended, only two examinees remained in the examination room and that neither of these examinees was Petitioner. It can be inferred therefrom that Petitioner had finished the examination, had time to spare, and had left the room. Finally, the inclusion of examination questions which were later deleted is not a concern as to the time allotted. This type of examination is a "power exam" and speed is not a factor.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection enter a Final Order denying the Petitioner's challenge to the February 1998 Class "B" wastewater operator certification examination and assigning her a final percentage grade of 63% thereon. DONE AND ENTERED this 16th day of November, 1998, in Tallahassee, Leon County, Florida. ELLA JANE P. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 16th day of November, 1998. COPIES FURNISHED: Gerrit Vanthul, Qualified Representative 5279 Southeast 39th Street Trenton, Florida 32693 Cynthia Christen, Esquire Department of Environmental Protection 2600 Blairstone Road Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 F. Perry Odom, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (2) 120.57455.217 Florida Administrative Code (2) 61-11.01061E12-41.005
# 7
VOLUSIA COUNTY vs. PENINSULA UTILITIES, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-003029 (1985)
Division of Administrative Hearings, Florida Number: 85-003029 Latest Update: Apr. 25, 1986

Findings Of Fact On or about October 30, 1984, Lawrence E. Bennett, a consultant engineer for Peninsula, forwarded to DER's domestic waste engineering section an application to construct/operate a domestic wastewater treatment and disposal system along with the appropriate plans and a check for the fee. The package included proposals for construction of a 300,000 gpd splitter box and addition of a 100,000 gpd contact stabilization plant. Thereafter, on May 22, 1985, Mr. Bennett submitted a revised copy of the application pertaining to the 100,000 gpd expansion initially submitted as above. The revised application reflected Peninsula's proposed outfall to the Halifax River which was applied for under separate permit. By application dated October 7, 1983, as revised on May 15, 1985, Peninsula proposed to construct an outfall discharge into the Halifax River from the secondary treatment plant. By letter dated October 29, 1984, Mr. Bennett advised DER, inter alia, that the discharge rate would be an ADF of 1.25 mgd. The application for the additional 100,000 gpd plant and splitter box also provided for a chlorination facility. This expansion was needed because 200,000 gpd capacity is already committed to serve current residents and customers of the utility. The new construction is designed to accommodate established future demand. In Mr. Bennett's opinion, the design of this facility will accommodate all DER criteria and standards. The outfall facility proposed in the second project will be a pvc forced main for a part of the distance with iron pipe for the remainder and a lift station attached to pump the effluent to a point in the river selected where the river is deep enough to meet DER water criteria. The initial permit application on this project called for discharge into a portion of the river which did not meet water quality standards. As a result; DER suggested discharge point closer to the center of the river, and this change is now planned. At this point, the outflow will meet DER standards. Intents to issue the permits, as modified, were issued in August 1985. Peninsula has also filed for permits with the Florida Public Utilities Commission, the United States EPA, and the U.S. Army Corps of Engineers for these projects. The plans are based on the estimated population expansion called for in the next few years. Peninsula is fully capable, financially, of providing and paying for the projected improvements. In the past, it has always provided sufficient funding to do that which is called for under its permits and which is necessary. The waters in question here are Class III waters of the State, mainly recreational. There is no shellfish harvesting in the area because of the pollution of the Halifax River, condition which has existed since at least 1941. Results of tests conducted by experts for Peninsula show the quality of the water presently coming out of the treatment plant is cleaner than that currently existing in the Halifax River. The outfall pipe in question will have the capability of handling approximately 1,200,000 gpd. Latest reports from the water treatment plant indicate that the current average daily flow is 150,000 gpd representing approximately 75% of capacity. The design estimated for this project was based on a 250 gpd per unit use rate multiplied by the estimated number of units presently existing and to be constructed in the period in question. It is estimated however, that within two to three years even this project will be insufficient and Peninsula will have to file an additional request for expansion. Construction will have no detrimental environmental effect on the waters of the Halifax River. Mr. Bennett recommends discharge into the river rather than pumping the effluent backup to Port Orange because the local dissipation rate into the Halifax River, which is called for under these projects, is much quicker than that at Port Orange. Studies run on siting of the outfall pipe location which is close to Daggett Island included studies relating to dilution calculation and water quality of the effluent versus water quality of the river near the outfall. The project was, therefore, sited in such a manner as to provide for the least possible detrimental effect. Those studies, however, were for the original outfall location, not the present location as proposed by DER which is approximately 150 to 200 feet away. In the experts' opinion, however, there is very little difference in the two sites. The Daggett Island site is not unique in any way. It is a mangrove swamp of approximately 3 to 4 acres with nothing on it. Once the pipe is buried, it will be difficult to know that it is there. Even during construction, there would be little detrimental effect or disruption to the river ecology. Mr. Bennett's conclusions are confirmed by Mr. Miller; a DER engineer specializing in wastewater facility permits who has reviewed the plans for expansion of the plant for completeness and adequacy and found that they were both. The approval of the outfall pipe initially was made in Tallahassee based on the original siting. He reviewed it again, however, and determined that both projects are environmentally sound and conform to the DER standards. Rule 17-6, Florida Administrative Code, requires surface water discharge to have secondary treatment activity prior to discharge and the discharge cannot exceed 20% 80D and suspended solids. According to DER studies; the secondary treatment afforded the water at this location was adequate with the caveat that the District might want to require an extension of the outfall to the main channel of the river to promote tidal flushing of the effluent. It was this change which was; in fact, made by the District office. Without the change, the incoming tide would take the wastewater up into Daggett Creek. By moving it as suggested, west of the point of Daggett Island, the tide would go up river rather than into the creek taking the effluent with it. Concern over the creek is due to its limited natural flushing as opposed to the greater natural flushing of the river. It was the intent of all parties to achieve the desired result and move the outfall point; if at all possible, at no increase in cost. Consequently, the pipeline was moved at the same length with a slight possible addition to take the outlet to the same depth and this change became a condition to the issuance of the permit. The Peninsula will also need a dredge and fill permit in order to accomplish the work in question. The outfall plans (both construction and discharge) meet the requirements set forth in the pertinent provisions of Rule 17-6, Florida Administrative Code. DER evaluated post- construction, concluding that the new point source discharge would not violate these standards. However, prior to approval of these projects, DER did not perform a biological, ecological, or hydrographic survey in the area. As a result, it cannot be said that the criteria outlined in Rule 17-4.29(6), Florida Administrative Code, will not be adversely affected by the outfall pipe. Nonetheless, these surveys were not deemed necessary here. EPA denial of the NPDES (National Pollution Discharge Elimination System) permit, would have no impact on DER's intent to issue the instant permits. NPDES permits have no bearing on the state permitting process. If the NPDES permit is denied, the utility cannot discharge its effluent into the river. The state permit merely authorizes the construction. The NPDES permit applies to the outfall portion of the project, not to the treatment plant. Only if it could be shown there was a longstanding adverse effect on the water quality so as to bring it below standards, would this construction not be permitted. The depth of the water in the proposed area of the outfall is five feet. A 12-inch pipe would extend below the soil with an upturn to exit into the bottom of the river. Short term impacts of actual construction are not relevant to the permitting process. If there are any, they would be related to and considered in the dredge and fill permitting process. This conclusion is supported by the testimony of Jan Mandrup-Poulsen, a DER water quality specialist who, in his analysis of the instant projects, first looked at the plans for the outfall just a week before the hearing. By this time, the water quality section of DER had previously considered the project and he is familiar with the suggested change in the outfall location. In November 1985, he spent several days on a boat on the Halifax River in this area collecting data. His inquiry and examination showed that in the area in question, there are no grass beds, oyster beds, or anything significant that would be adversely affected by the location of the pipe and the outlet. The pipe outlet, as suggested, is far enough out into the river to keep it under sufficient water at all times to promote adequate flushing. In his opinion, the proposed discharge will be quickly diluted and will not violate the standards or other criteria set out in Section 17-3.121, Florida Administrative Code. In contrast to the above, Mr. Richard Fernandez, a registered civil engineer with a Master's Degree in environmental engineering, who did a study of these projects for TPI, indicated that the County 201 plan relating to this area, mandated by the federal government, calls for the eventual closing of all independent wastewater treatment plants with ultimate delivery of all wastewater to the Port Orange facility. If implemented, this plan calls for the conversion of the Peninsula facility to a pump station for the transmittal of effluent to Port Orange. In his opinion, the proposed discharge standard, as evaluated here, for the secondary treatment facility, is very high for such a facility. He feels the surface water discharge content of dissolved oxygen and suspended solids should be lower. In addition, he is of the opinion that the degree of treatment of discharged water required by the facilities in question here is too low and lower than typical secondary discharge points elsewhere in the area. Nonetheless, Mr. Fernandez concludes that while the intended facility here would probably not lower the quality of river water below standards, it is not in the public interest to construct it. Having considered the expert testimony on both sides, it is found that the construction requested here would not create sufficient ecological or environmental damage to justify denial. The proposals in the 201 plan calling for the transmittal of all effluent to Port Orange would not be acceptable to DER. The cost of such a project and the ecological damage involved would be so great as to render the project not even permittable. The currently existing percolation ponds used by the facility at Port Orange are not adequate to serve current needs and leech pollutants into the surrounding waterway. While the exact transmission routes called for under the 201 plan are not yet set, there would be substantial ecological problems no matter what routing is selected. There would be substantial damage to bird habitat, mangrove, and other protected living species unless some way were found to get the pipe across the river in an environmentally sound fashion. Consequently, DER has taken the position that the current proposals by Peninsula are superior to any plan to transmit waste to Port Orange.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore RECOMMENDED THAT DER: Enter an order dismissing with prejudice Volusia County's Petition in DOAH Case No. 85-3029 and, Issue permits to Peninsula Utilities, Inc., for the construction of a 100,000 gpd expansion to its existing wastewater treatment plant and to construct a river outfall line as was called for in the amended specifications listed in the application for this project. RECOMMENDED this 25th day of April, 1986, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of April, 1986. COPIES FURNISHED: Martin S. Friedman, Esquire Myers, Kenin, Levinson & Richards 2544 Blairstone Pines Drive Tallahassee, Florida 32301. Deborah Getzoff, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Rd. Tallahassee, Florida 32301 Lester A. Lewis, Esquire Coble, McKinnon, Rothert, Barkin, Gordon, Morris and Lewis, P.A. P. O. Drawer 9670 Daytona Beach, Florida 32020 Ray W. Pennebaker, Esquire Assistant County Attorney P. O. Box 429 Deland, Florida 32720 Victoria Tschinkel Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 APPENDIX The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings Of Fact submitted by the parties to this case. Rulings on Proposed Findings of Fact Submitted by Petitioner, TPI 1-2. Accepted in paragraph 17. 3-4. Rejected as contra to the weight of the evidence. Rulings on Proposed Findings of Fact Submitted by Peninsula 1-13. Accepted in the Findings of Fact of the Recommended Order. Rulings on Proposed Findings of Fact Submitted by Respondent, DER 1. Accepted and incorporated in Finding of Fact 1 and 2. 2-3. Accepted and incorporated in Finding of Fact 5. 4-5. Accepted and incorporated in Finding of Fact 20 and 21. 6. 7. Accepted in Finding of Fact 19. 8. Accepted in Finding of Fact 14. 9. Accepted in Finding of Fact 9. 10. Accepted in Finding of Fact 8 and 21. 11. Accepted in Finding of Fact 14 and 17. 12-13. Accepted in Finding of Fact 14 and 17. 14-15. Rejected as a statement of evidence and not a Finding of Fact. Accepted in Finding of Fact 17. Recitation of Mr. Miller's testimony is not a Finding of Fact. The conclusions of Mr. Mandrup- Poulsen's testimony is not a Finding of Fact. Recitation of Mr. Mandrup-Poulsen's testimony testimony is not a Finding of Fact. Accepted in Finding of Fact 23. Recitation of testimony is rejected as not a Finding of Fact. Conclusions drawn from that testimony accepted in Finding of Fact 24.

Florida Laws (2) 403.87403.88
# 8
LESTER WESTERMAN vs. ESCAMBIA COMPANY UTILITIES AUTHORITY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-000035 (1989)
Division of Administrative Hearings, Florida Number: 89-000035 Latest Update: Feb. 02, 1990

Findings Of Fact South of the intersection of Blue Angel Parkway and Gulf Beach Highway in southwest Escambia County lies the wooded, 69-acre tract, designated "Site F," onto which ECUA proposes to dispose up to three million gallons of wastewater a day. Petitioner Westerman operates a marina nearby. The individual intervenors own houses in the vicinity as, apparently, do other members of the intervening association. A state agency with wide ranging environmental responsibilities, DER permits construction of wastewater treatment facilities in conformity with its rules. Sewage disposal is one of several utility services ECUA provides residents of Escambia County. A Trip to the Beach Under orders from DER and the Environmental Protection Agency (EPA) to cease discharging directly into Bayou Chico ("a very impacted body of water ... [with] very difficult problems" T. 101), ECUA proposes to build a pumping facility and install enough 24-inch pipe to enable it to send effluent from its wastewater treatment plant in Warrington to Site F, for "rapid rate" land application. Upgraded since DER and EPA forbade direct discharges into Bayou Chico, the Warrington plant now employs advanced treatment techniques to remove most phosphorous and nitrogen from its effluent. Nevertheless, in order to mollify regulators, ECUA has plans to ship the effluent through some seven miles of pipe to Site F. In the opinion of its executive director, ECUA is "an easy target . . . . Whether it's practical or fair is really not the question." Id. He feels, "cost is not a factor" (T. 102) that the regulatory authorities have taken into account. Sandy Soils Site F straddles a coastal ridge, vegetated dunes that separate Garcon Swamp from Big Lagoon. Elevations vary from 29 feet above mean sea level at the crest of the ridge to nine feet above mean sea level in the swale that traverses the property. Highly permeable surficial sand extends to depths ranging between 20 and 35 feet below grade. Under the surficial sand, a layer of silty sand, extending down 55 to 60 feet, overlies another layer of very clean sand, much denser than the surficial sand. At depths of 90 to 110 feet, a clay aquiclude undergirds these sandy strata. Using field and laboratory test results, experts put the average hydraulic conductivity of the surficial sands at 35 feet per day, of the silty middle sand layer at 10 to 15 feet per day, and of the clean but dense sands on top of the clay at 5 to 10 feet per day. In addition to laboratory results, two pump tests support these conclusions. Results of two other pump tests indicating hydraulic conductivity of 4.7 and 5.0 feet per day were dismissed as unreliable. Sand caving in compromised at least one of these tests. As far as the record reveals, no bench-scale or pilot-scale hydraulic testing took place. According to DER's Mr. Reinning, there was "more soil testing on this site than [he had] seen on any other permit event." T.II. 217. Although the soils on the site are "relatively uniform," (T.II. 212) no layer of sand is perfectly uniform. Mr. Jacobs, one of ECUA's consultants, testified that a boring on one of the proposed pond sites revealed a one-foot layer of sand and organics with a vertical hydraulic conductivity of one foot per day. T.I. 245. Perhaps Mr. Jacobs was referring to boring B-2, which, according to the log, reflects a two-foot interval of peat and decaying wood, at a depth of slightly more than 13 feet. ECUA's Exhibit 2. No other boring gave evidence of this layer. The nearest bore hole to B-2 was more than 200 feet away. Expert testimony that the borings did not indicate an "extensive pocket," and gave no reason to fear a "per(c)hed water table," (T.II. 214) was not controverted. Construction Plans ECUA proposes to construct 16 percolation ponds or cells on Site F. Seven pairs of cells would be terraced on a north-south axis, with an eighth, noncontiguous pair at an angle in the southwestern portion of the property. Cell bottoms, at elevations ranging between 16 and 27 feet above mean sea level, would have a surface area aggregating some 23 acres (1,027,900 square feet.) ECUA would erect a perimeter fence and install warning signs. Except for valves, "no mechanical equipment [would be) involved in the disposal site," T.123, nor are "bright lights," id. planned. Water flowing into percolation ponds does not create an aerosol. Odors are not foreseen. Encircling each infiltration basin, berms three to three and a half feet higher than the cell bottoms would contain effluent and deflect sheet flow. Except for rain falling directly into the cells, stormwater would not reach the percolation cells. Chances that effluent augmented by rainfall would overflow the berms are remote. A 100-year, 24-hour return storm would not interrupt operation of the facility. No percolation pond site lies within the 100-year flood plain. No percolation basin is to be located within 500 feet of a potable water supply well or class I or class II surface water; or closer than 100 feet to the boundary of the property. Situated within some 20 acres of wetlands, a brackish pond lies about 1,000 feet from the nearest cell planned, between Site F and Big Lagoon into which the pond opens. At the nearest point, Big Lagoon itself comes within 1200 feet of a planned percolation cell. A swale or slough bridged by Blue Angel Parkway runs southwesterly north and west of the main phalanx of percolation ponds ECUA proposes, then turns a corner and runs southeasterly, separating the two cells proposed for the southwest portion of the property from the others. The nearest percolation pond is to be built about 100 feet from wetlands associated with the swale. Loading Rates ECUA plans to direct wastewater into half the cells one week and the remainder the next, alternating like the squares on a chessboard. The exact cycle is not a condition of the construction permit, however, and computer modelers assumed loading cycles consisting of two two-day periods. As applied to the total bottom area of percolation cells, the average daily loading rate for three million gallons a day (mgd) would amount to 2.91 gallons per square foot. Because half the ponds would be resting at any given time, ponds receiving effluent would experience inflow at an average rate of 5.82 gallons per square foot. In deciding the length of the loading cycle, as "the soil gets lower in permeability you have to really stretch your time for loading out, because it takes the water much longer to get out of the loading area." T.I. 188. But, with respect to the long-term capacity of the system, "the period of loading and resting . . . really doesn't significantly affect . . . how the site is expected to perform." T.II. 222. In the absence of bench-scale or pilot-scale tests heretofore, the applicant "intend[s] to load test this site, because just for the various concerns, because it is a big site." T.I. 189. Groundwater Effects Class G-II groundwater under the site now flows generally southerly toward the brackish pond and Big Lagoon. An expert put the rate of flow under the site at .22 feet per day, but concluded that the rate increased to approximately a half foot a day between Site F and Big Lagoon. As far as is known, groundwater under the sites proposed for the infiltration ponds rises no closer to the surface than six to nine feet, even under wet conditions, although the evidence by no means conclusively established that it would never rise higher. Some groundwater emerges in the swale during wet periods, and flows in the swale as far as the brackish pond, to which other groundwater makes regular, direct contribution. At the edge of the lagoon, further out in the lagoon and possibly in the Gulf of Mexico, still other groundwater comes up as springs. At least initially, the sandy soils would accept effluent readily. Until and unless actual experience showed that the facility could handle the three mgd for which it is designed, the plan is to dispose of no more than 2.5 million gallons of effluent a day. Before equilibrium is attained, ongoing disposal of effluent would gradually raise the level of groundwater under the site, inducing, on the preexisting, sloping surface of ambient groundwater, a mound, on which 16 smaller mounds (corresponding to the loading nozzles discharging wastewater into the percolation ponds) would superimpose themselves, half swelling, like so many goose eggs, half subsiding, at any given time. Adding effluent should not materially alter the ultimate direction of flow. For the most part, even groundwater flowing in other directions off the mounds induced under the site would eventually turn south toward the lagoon. But a steeper gradient should speed up the flow. Percolating effluent would increase the volume not only of seepage into the swale but also of subterranean flow reaching both the brackish pond and the lagoon. Increased seepage upslope from the slough would flow down into the swale, along the stream bed, and into the brackish pond. Monitoring As modified at hearing, ECUA's monitoring plan contemplates eight wells and four surface water monitoring points from which water samples would be periodically taken for analysis, to determine levels of nitrogen, phosphorous and other chemical and biological constituents of concern. Once the facility began operating, no well would yield "background" samples uninfluenced by the effluent. T. I. 221. The wells are all to be located on ECUA property and, therefore, close enough to the percolation ponds to receive ground water flows radiating from the mounds adding the effluent would induce. Final Destination Effluent emerging in seepage, perhaps as much as 75 percent of the total (T. III. 47), could reach Big Lagoon, by way of the swale and the brackish pond, soon after regaining the surface of the land. Wetland vegetation would filter such flows, already diluted underground and sometimes by stormwater runoff, on their way to the lagoon. Effluent that mixed with groundwater traveling to Big Lagoon underground would not show up in the lagoon for months or years. But when it arrived, much diluted and after such attenuation of pollutants as the largely inorganic soils afforded, it would also contribute to subtle changes in the waters of Big Lagoon. Virtually all effluent would ultimately end up in Big Lagoon. T.I. 234; T.III.45. Two channels connect Big Lagoon to Pensacola Bay to the east, and a single, more constricted channel connects it to Perdido Bay to the west. Tides influence the circulation of the Class III water within Big Lagoon, variously calculated to amount to some ten or eleven billion gallons of clean salt water. Through Pensacola Bay and Perdido Bay, Big Lagoon communicates with the Gulf of Mexico. As the tide rises, water from the adjacent bays enters the long and narrow reaches of Big Lagoon, at either end. As the tide ebbs, water in the lagoon (including a significant portion of bay water introduced by the preceding tide) flows out either end. ECUA's expert's claim that tides flush the lagoon in less than nine days did not take this back-and-forth movement into account, or look specifically at the four-billion gallon basin into which the brackish pond overflows. Big Lagoon lies south of the mainland and north of Perdido Key, one of the barrier islands paralleling the coast. These islands and waters north of them, extending as far as the southern boundary of the intracoastal waterway, comprise the Gulf Islands National Seashore. By rule, the waters of Big Lagoon south of the intracoastal waterway have been designated Outstanding Florida Waters. Two to three hundred yards wide, the intracoastal lies not far offshore the mainland. Water Quality Analysis of a single ground water sample revealed nutrient levels, but neither the applicant nor DER developed any data specific to Big Lagoon about nutrient levels there. Chemical analyses done on four samples of lagoon water (at petitioner's expense) revealed no nitrate nitrogen above detection levels in any of the samples, and no ammonia nitrogen above detection levels in three of the four samples, but disclosed 0.08 parts per million in the fourth. Three of the four samples contained 0.02 parts phosphorous per million, while the fourth had phosphorous in a concentration of 0.03 parts per million. Tests with water taken from Big Lagoon showed that the addition of both nitrogen and phosphorous compounds (but not the addition of one without the other) coincided with algal growth in one of four sets of samples, each set including a control in which such growth did not occur. In other samples of lagoon water into which algae were introduced, the addition of nitrogen, either alone or in combination with phosphorous, seemed to cause blue-green algae to predominate, instead of the dominant, indigenous pennate diatoms. In these experiments, ammonia chloride was added to produce nitrogen concentrations of 17.5 grams per liter, six times greater than would be allowed in the effluent, as much as 17 times greater than the concentration petitioner's expert predicted for wastewater reaching the lagoon, and two orders of magnitude above ambient levels. The experimenter also added sodium phosphate dibasic heptahydrate to create phosphorous concentrations of four grams per liter, which is also two orders of magnitude above levels naturally occurring in Big Lagoon. Special permit conditions limit (on an annual average) total nitrogen in effluent sent to Site F to 75 pounds per day, and phosphorous to one milligram per liter, which would amount to 25 pounds in three million gallons, the maximum daily flow. Permit conditions also prescribe limits for acidity and alkalinity (pH must be greater than 6.0 and less than 8.5), suspended solids, and biochemical oxygen demand. Basic dis- infection is required. Assuming ECUA disposed of three mgd at Site F, up to 25 pounds of phosphorous could be added to the estuary daily, on average, or more than a ton of phosphorous quarterly, if steady state were attained. Although three times as much nitrogen might occur in the effluent, oxidation and reduction would cause some nitrogen to enter the atmosphere as a gas instead of remaining dissolved until it reached the estuary. Not only organic components of the soil but also organic matter arriving in the effluent and accumulating on pond bottoms would contribute to denitrification. Salinity in the brackish pond would decline. A DER employee, Mr. Swartz, testified that placing three mgd of effluent in the planned percolation ponds "would not result in degradation of the surface water," (T. II. 127) citing "our experience here in Florida." Id. Whatever may be said as regards the brackish pond, no evidence gave substantial reason to question the accuracy of this opinion as it relates to waters south of the intracoastal waterway.

Recommendation It is, accordingly, RECOMMENDED: That DER deny the application, without prejudice to the filing of another after successful bench-scale or pilot-scale hydraulic testing and after ECUA has made arrangements for a ground water monitoring well from which samples unlikely to be affected by the effluent may be drawn. DONE and ENTERED this 2nd day of February, 1990, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of February, 1990. APPENDIX Petitioner's proposed findings of fact Nos. 1 through 8, 13, 14, 16 and 18 have been adopted, in substance, insofar as material. Most of petitioner's proposed finding of fact No. 15 accurately recites testimony adduced, but Shuba testified that algal growth has been stimulated by nutrient concentrations comparable to those Dohms said would occur in water entering Big Lagoon, not in concentrations likely to exist once this wastewater-bearing contribution mixed with other water in the lagoon. Petitioner presented information about nutrient levels in lagoon water at hearing. Computer modeling suggested break out, which has been considered. Petitioner's proposed findings of fact Nos. 17 and 19 accurately recite the testimony. DER's proposed findings of fact Nos. 1, 2, 3, 4, 5, 10, 11, 12, 13, 15, 16, 17, 18, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 42 and 43 have been adopted, in substance, insofar as material. With respect to DER's proposed finding of fact No. 6, the rate of flow increases south of the proposed pond sites. With respect to DER's proposed findings of fact Nos. 7 and 8, seasonal high ground water elevations were not shown conclusively. With respect to DER's proposed finding of fact No. 9, the aquiclude lies 90 to 110 feet below the surface. With respect to DER's proposed finding of fact No. 14, the rule requires a five-day rest. With respect to DER's proposed findings of fact Nos. 33, 34 and 35, the current rules do require mounding analysis, and there seemed to be a consensus that ground water enhanced by effluent would seep to the surface downslope from the ponds. With respect to DER's proposed findings of fact Nos. 36 and 37 and 44, free form agency action is technically immaterial. With respect to DER's proposed findings of fact Nos. 38, 39, 40 and 41, effluent would have mixed with groundwater before reaching Big Lagoon, but increased levels of nitrogen and phosphorous could be detected, as a result. ECUA's proposed findings of fact Nos. 1, 3, 4, 5, 6, 8, 10, 11, 12, 15, 16, 17, 20, 23, 24, 25, 26, 27, 28, 36, 37 and 38 have been adopted, in substance, insofar as material. With respect to ECUA's proposed findings of fact Nos. 2, 13, 21 and 32, the evidence showed that it was not unlikely that effluent, after percolating through pond bottoms and mixing with groundwater, would seep to the surface down slope. With respect to ECUA's proposed finding of fact No. 7, proposed cell bottom elevations fall in this range. With respect to ECUA's proposed finding of fact No. 9, the evidence did not establish that the high water table will always be nine feet below the pond bottoms. With the induced mound, ECUA's proposed finding of fact puts it at one to two feet. With respect to ECUA's proposed finding of fact No. 14, the tidal range is too high and the calculation ignores the back and forth movement of waters at either end of the lagoon. With respect to ECUA's proposed findings of fact Nos. 18 and 19, the current standard pertains total nitrogen. With respect to ECUA's proposed finding of fact No. 22, freeboard will vary with rainfall and effluent levels. ECUA's proposed findings of fact Nos. 29, 30, 31 and 34 relate to subordinate matters. With respect to ECUA's proposed finding of fact No. 33, more than one analysis was done. With respect to ECUA's proposed finding of fact No. 35, the applicant has given reasonable assurance. COPIES FURNISHED: Robert W. Kievit, Esquire Lester M. Westerman 10451 Gulf Beach Highway Pensacola, FL 32507 James Mullins 11001 Gulf Beach Highway Pensacola, FL 32507 Susan Guttman 11315 Sea Glade Drive Pensacola, FL 32507 Cindy L. Bartin, Esquire 15 West Main Street Pensacola, FL 32501 Joseph W. Landers, Esquire 310 West College Avenue Tallahassee, FL 32302 Stephen K. Hall, Esquire Asst. General Council Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32301 =================================================================

Florida Laws (4) 120.52120.57120.60120.68
# 9
TAMARON UTILITIES, INC. vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002968 (1991)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Dec. 16, 1991 Number: 91-002968 Latest Update: Jun. 20, 1994

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Tamaron wastewater treatment facility (facility), located at 3800 Gatewood Drive, Sarasota, Florida, serves the Tamaron residential subdivision which was originally developed by U. S. Homes Corporation in 1976. The subdivision presently consists of 499 homes and was completely built out in the mid-1980's. The facility was originally owned and operated by U. S. Homes Corporation. Tamaron Utilities, a nonprofit entity comprised of the 499 homeowners, acquired the facility in November, 1987. At that time, the facility's existing operating permit was transferred to Tamaron Utilities. The facility is overseen by an elected board of volunteer homeowners. The Department is the agency of the State of Florida that is authorized to regulate domestic wastewater treatment and disposal facilities and permit their construction and operation. It is the successor agency to the Department of Environmental Regulation. By letter dated November 10, 1987, the Department notified Tamaron of the requirements of Chapter 87-303, Laws of Florida (Grizzle-Figg Amendment), which amended Section 403.086, Florida Statutes, and of the Department's intention to modify Tamaron's operating permit to incorporate a schedule of compliance with Section 403.086, Florida Statutes, as amended by Chapter 87-303, Laws of Florida. On August 23, 1988, an operating permit (D058-141783), which contained secondary water treatment requirements, was issued to the facility. Specific condition 7 of the permit required that the facility be in compliance with the Grizzle-Figg Amendment by October, 1990, or eliminate discharge to surface waters. On September 5, 1990, Tamaron filed an application with the Department to renew its domestic waste water treatment and disposal systems operation permit. Tamaron did not consider its facility as discharging waste into one of the specifically named water bodies set forth in the Grizzle-Figg Amendment or to "water tributary thereto" and thereby required to meet the advanced waste treatment criteria set forth in the Grizzle-Figg Amendment. However, in an abundance of caution, Tamaron proceeded to bring its facility into compliance with the advanced waste treatment criteria as set forth in the Grizzle-Figg Amendment. After numerous requests for additional information and several meetings between Tamaron and the Department, the Department issued its Notice of Permit Denial on April 9, 1991, asserting that Tamaron had not provided: (a) reasonable assurance that the requirements of Section 403.086(1)(c), Florida Statutes, mandating advanced waste treatment (AWT) before discharge to certain designated surface waters, would be met and; (b) reasonable assurance that the discharge to those certain designated surface waters would result in minimal negative impact as required by Section 403.086(5)(a), Florida Statutes. The facility continues to operate under its secondary treatment permit No. DO58-141783. The facility consists of a wastewater treatment plant designed for secondary treatment, with tertiary filtration. The design capacity of the facility is 155,000 gallons per day (0.155MGD) with actual flows of slightly over 100,000 gallons per day (0.100MGD+). Three percolation ponds surround the facility comprising the primary effluent disposal method for the facility. The Tamaron subdivision has a series of excavated surface water bodies (stormwater lakes), hydraulically connected, which eventually discharge at the northeast corner of the subdivision into Phillippi Creek. The direct path of surface water flow is from the subdivision's stormwater lakes to Phillippi Creek. These stormwater lakes are in multiple ownership. Under Department policy, stormwater systems permitted by the Department, its predecessor DER, or a water management district solely as stormwater treatment facilities under Chapter 17-25, Florida Administrative Code, are not considered "waters of the State". However, stormwater systems built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, were considered "waters of the State" if they discharge more frequently than a twenty five year, twenty-four hour storm event. See Petitioner's exhibits 13 & 15. Tamaron's stormwater system was built prior to Chapter 17-25, Florida Administrative Code, permitting requirements, and was designed to discharge at a ten year, twenty-four hour storm event which is more frequent than a twenty five year, twenty-four hour storm event. Discharge of water into Phillippi Creek from the subdivision's stormwater lakes is fairly frequent; however, the volume of the discharge is low. Phillippi Creek is a natural surface water which eventually flows into Roberts Bay. Roberts Bay is a specifically named water body in the Grizzle-Figg Amendment (Section 403.086(1)(c), Florida Statutes). Since September, 1989, Tamaron has retained William Murchie, P.E. of AM Engineering, to evaluate the design and operation of the facility in order to comply with appropriate regulatory requirements. The facility provides biological treatment through a contact stabilization utilizing an activated sludge. This process typically provides high quality advanced secondary biological treatment. A chemical feed tank system utilizing ferrous sulfate was added to the facility several years ago to chemically precipitate out total phosphorus to meet the advanced waste treatment requirements. High-level disinfection is achieved in the large chlorine contact chamber and through two tertiary filters. At the design flow of 0.155MGD, the chlorine contact chamber provides nearly 80 minutes of contact time, while actual contact time for existing flows, not including time in filters, is calculated at 110 minutes. Upon leaving the chlorine contact chamber and the biological treatment components of the facility, the chlorinated effluent is directed through two tertiary filters to reduce the biochemical oxygen demand (BOD) and total suspended solids (TSS). After the tertiary filters, the effluent passes through the sample block where it is sampled for TSS, BOD and chlorine and is then piped sequentially into the first, second and third percolation ponds. The percolation ponds span two acres and provide residence time of 35 to 45 days, during which time the effluent is further biologically treated and nitrogen is reduced. From the percolation ponds, the effluent is pumped into a low pressure system which uniformly distributes effluent over two nitrogen reduction filters. The nitrogen reduction filters are located north of the plant and are immediately adjacent to one of the subdivision's stormwater lakes. The nitrogen reduction filters consist of deep sand beds covered with Bermuda grass to provide high nitrogen uptake. The irrigation of the two nitrogen reduction filters is alternated every half day. These nitrogen reduction systems were modified in October/November, 1990, by adding 3 to 3 1/2 feet of clean sand with a permeability rate of 28 feet per day, planting Bermuda grass, and installing an irrigation/distribution system. These filters replaced two sand pits with shallow layers of very coarse sand, after initial testing demonstrated the sand pits to be inadequate in removing nutrients consistent with statutory requirements. In January, 1992, an underdrain system utilizing perforated pipe was installed in the nitrogen reduction filters to create an aerobic zone and to provide a representative sample port after nutrient reduction in the filters. This sample port, used for the biweekly monitoring, consists of a single solid pipe, that collects effluent from the perforated pipes, with a tap to prevent discharge into the adjacent stormwater lake, except during sampling events. The biweekly sampling event results in effluent being discharged from the pipe for approximately 30 minutes to flush the pipe so as to get a proper sample. The underdrain sampling port at the nitrogen reduction filters replaced two earlier monitor wells between the nitrogen reduction filter and the stormwater pond, which proved ineffective because of their location. The perforated underdrains are situated in filter bed sand of medium grain size with a permeability rate 100 feet per day and located below 3 - 3 1/2 feet of clean sand with a permeability rate of 28 feet per day and above very permeable layers of sand, stone and coarse shell. (See Tamaron's exhibit 23 and Department's exhibit 14) The very permeable layers of sand, coarse shell, the perforated pipe and the single solid pipe are all located above the ground water table. Since the perforated pipe and sample port are both located above the ground water level and the surface of the adjacent stormwater lake, it is unlikely that the effluent sample taken from the sample port would be influenced by the ground water or a back flow of water from the adjacent stormwater lake. The coarse shell layer situated below the nitrogen reduction filters extends to the edge of the adjacent stormwater lake. Therefore, the effluent, other than the effluent trapped in the perforated pipe and carried to the sample port, that is irrigated onto the nitrogen reduction filters passes through the sand and into the coarse shell layer. The effluent is then transported laterally through the coarse shell layer to the underground edge of the adjacent stormwater lake where there is a subsurface discharge into the adjacent stormwater lake. Since the discharge to the stormwater lakes is primarily subsurface in nature, the logical compliance point to measure effluent parameters would be the underground sample port which collects the effluent prior to subsurface discharge into the stormwater lake. See Petitioner's exhibit 15. The direction of ground water flow at the facility is towards the north to the adjacent stormwater lakes as evidenced by the hydraulic gradient of the site determined using ground water table elevations. The location for sampling effluent from the facility for compliance with secondary standards was described in Specific Condition 5 of Tamaron's previous permit No. D058-141783 dated August 23, 1988. Specific Condition 5 states that the discharge from the chlorine contact chamber shall be sampled in accordance with Chapter 17-19, Florida Administrative Code, (now Chapter 17-601, Florida Administrative Code), for compliance with the stated secondary limits. The facility's tertiary filters are located after the chlorine contact chamber. Tamaron samples effluent for compliance with secondary standards (BOD,TSS, chlorine) at the sampling box after disinfection and tertiary filtration. Tertiary filtration is designed to achieve a more efficient removal of TSS and BOD. The resulting effluent is usually of higher quality than secondarily treated effluent. A secondary plant with tertiary filtration is referred to as an "advanced secondary treatment" plant. Data presented by Tamaron titled Tamaron 1991-1993 Data On FDER Permit Compliance (Tamaron's exhibit 17, page 1 of 2) shows reported values, sampled after tertiary filtration at the sample box, which suggest that secondary treatment parameters, including fecal coliform, are not being exceeded. The data actually shows a very high removal rate for the parameters sampled. The United States Environmental Protection Agency issued a National Pollutant Discharge Elimination System (NPDES) permit, number FL0042811, to Tamaron for the facility with an effective date of June 1, 1991, which authorized Tamaron to discharge from the facility to the receiving waters named Phillippi Creek to Roberts Bay in accordance with the effluent limitation, monitoring requirements and other conditions set forth in the permit. Since the facility was located in the Grizzle-Figg Amendment area of Florida certain changes were made from the draft permit to the final permit. Those changes appear in the Amendment To The Statement Of Basis At The Time Of Final Permit Issuance which is made a part of the final permit. The amendment provides for changes in Part I, Effluent Limitations and Monitoring Requirements. These changes, among other things, require that the Grizzle-Figg Amendment annual limits of 5 mg/l BOD, 5mg/l TSS, 3mg/l total nitrogen and 1mg/l total phosphorus be added to the effluent limits to adequately maintain water quality standards, and added monitoring requirements and measurement frequency regulations to give the basis for permit limits and conditions in accordance with Chapters 17-302, 17-600 and 17-601, Florida Administrative Code. Data presented by Tamaron titled Tamaron 1991-1993 Data On NPDES Permit Compliance (Tamaron's exhibit 17, page 2 of 2) show reported values sampled after nitrogen reduction filters which suggest that the maximum values for AWT parameters, including fecal coliform, are not being exceeded, particularly after January, 1992, when Tamaron began sampling effluent collected by the perforated underdrains at the sample port. Tamaron has been monitoring and reporting compliance under its final NPDES permit and providing copies to the Department. There was no evidence that Tamaron was ever in violation of its NPDES permit. Tamaron submitted documentation to the Department with its permit application that demonstrated high-level disinfection within the facility was being achieved. However, TSS was being sampled after the application of the disinfectant. Using this procedure, the facility continued to achieve high- level disinfection until the permit denial. After the permit denial, the facility resumed basic disinfection which was required under Tamaron's permit for secondary treatment. This same data indicates that there was compliance with the requirements for fecal coliform. The record is not clear as to the frequency and number of samples taken to provide the data for reporting compliance with the NPDES permit and the data presented in Petitioner's exhibit 17, page 2 of 2. However, there was no evidence, other than sampling for TSS after the disinfectant was added, that Tamaron was not complying with its NPDES Permit that required, among other things, that the monitoring requirements and measurement frequency of the Department's rules and regulations be followed by Tamaron. Tamaron has modified and upgraded the facility in order to achieve a treatment process which will produce effluent of a quality for discharge under the Grizzle-Figg Amendment. Tamaron has provided reasonable assurances, although not absolute assurance, that the facility can comply with the discharge permit requirements of Chapter 403, Florida Statutes, including Section 403.086, Florida Statutes, notwithstanding the testimony of Jay Thabaraj to the contrary concerning Tamaron's sampling technique and its method of obtaining high-level disinfection which can be addressed as a specific condition, if necessary. Studies conducted by the Tamaron's engineer included in Petitioner's exhibit 21 indicates that there was no adverse impact to the stormwater lakes from the facility's wastewater treatment and disposal system. Tamaron has provided reasonable assurances that the point of discharge is a reasonably access point, where such discharge results only in minimal negative impact.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department enter a final order granting Tamaron an operating permit for its facility as secondary treatment facility. In the alternative, that the Department enter a final order granting Tamaron an operating permit for its facility that requires compliance with the advanced waste treatment criteria set forth in Section 403.086(4), Florida Statutes, that, in addition to any general or specific conditions that are normally required, contains specific conditions that: (a) contains specific instructions on sampling technique, sampling frequency and reporting as set forth in Rule 17- 740(1)(b)2., Florida Administrative Code, and (b) sets forth compliance with high-level disinfection, with a time limit for compliance, that accomplishes the intent of the rule, if not the strict letter of the rule, without total redesign of the facility. DONE AND ENTERED this 3rd day of May, 1994, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-2968 The following constitutes my specific rulings, pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Petitioner, Tamaron's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1); 2(2); 3(3); 4(5,6); 5(6); 6(7); 8(12); 10(8); 11-12(13-25,38); 13(31-34); 14(8); 15(13); 16(14); 17-18(15); 19(36); 20(16); 21(17); 22(18); 23(19); 24(20); 25(21);26(22); 32(32,7); 33(33); 34(32,32); 36(31); 39-40(34); 41(36); 42- 43(34); 44(35); 47(4); and 51(10). Proposed findings of fact 27-31, and 35 are conclusions of law rather than findings of fact.. Proposed findings of fact 45, 46, 48-50, 56, 57, 59, and 61-72 are arguments rather than findings of fact. Proposed findings of fact 7, 9, 37, 38, 52-55, 58 and 60 are neither material nor relevant. Respondent, Department's Proposed Findings of Fact: The following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1(1,6); 2(2); 3(4,10); 5(9); 6(9,10); 8(11); 9-17(18-27); 18(8); 19(13); 20(5); 21(17); 22(30); 23(31); 24(14); 25(17); 26(18-23); 27(34); and 32(35,38). Proposed finding of fact 4 is neither material nor relevant but see Findings of Fact 18-25. Proposed findings of fact 7, 31 and 33 are arguments rather than findings of fact. Proposed findings of fact 28-30 are conclusions of law rather than findings of fact. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Charles G. Stephens, Esquire C. Robinson Hall, Esquire Enterprise Plaza, Suite 1516 101 E. Kennedy Blvd. Tampa, Florida 33602 Francine Ffolkes, Esquire Office of General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (6) 120.57120.68403.021403.031403.061403.086