Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs BRIAN D. LEGATE, 98-005187 (1998)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Nov. 23, 1998 Number: 98-005187 Latest Update: Jun. 01, 1999

The Issue The issues in this case are whether the Respondent, Brian D. Legate, should be disciplined on the charges in the Administrative Complaint, PCCLB Complaint No. C98-556. Specifically, the Administrative Complaint charged violations of Section 24(2)(d), (j), (m), and (n) of Chapter 75-489, Laws of Florida (1975), as amended, by: Count I - failure to obtain a building permit before beginning roofing work, contrary to the requirements of Section 104 of the Standard Building Code; Count II - covering rotted roof framing and building a roof that leaked, contrary to the requirements of Section 1509.1.2.1 of the Standard Building Code; and Count III - committing gross negligence, incompetence, or misconduct in the practice of contracting.

Findings Of Fact The Respondent, Brian D. Legate, is a licensed roofing contractor. He holds license C-4676 (RC0061241). On approximately March 16, 1998, Mr. and Mrs. Richard Shutt requested an estimate from Legate for the repair of a leaking roof at their house at 7127 Third Avenue South, St. Petersburg, Florida. The leaking portion of the roof was a flat, built-up roof that was over the single-story living room of the house and adjacent to a second story bedroom; the other three sides of the perimeter of the leaking roof consisted of capped parapet walls. The roof and tile covered the flat portion of the roof and extended approximately ten inches up the inside of the parapet walls. The Shutts did not testify. Legate testified that the Shutts could not afford to completely rebuild and seal the parapets, re-roof, and re-tile. Instead, the Shutts wanted Legate to tear off the old roof down to the wood decking and re- roof to try to stop the roof leak; the Shutts planned to have someone else rebuild and seal the parapets and finish the roof with new tiles in about six months. Legate recognized that the Shutts' plan was not ideal; it would be difficult to maintain a watertight roof system until the parapets were rebuilt and sealed and the tiles replaced. Under the Shutts' plan, Legate would have to tack the new roof to the lower part of the parapet walls as best he could and tuck the upper edge of the new roof under the drip edge on the parapet wall to secure it temporarily until the parapet walls were rebuilt and sealed and the new tile installed. But Legate agreed to cooperate with the Shutts and give them an estimate for the work requested. Legate also recognized that it would have been best to install new flashing between the new roof and the parapet walls above the roof. The old metalwork serving as flashing on the existing roof system actually was a metal roof drip edge that was being misused as flashing. Legate recommended new flashing, but the Shutts declined because it would cost an additional $1,500 that they could not afford. On or about March 16, 1998, Legate gave the Shutts an estimate, without any new metalwork, for $4,000, plus $950 for new roof drains. Legate planned to install the roof drain bowls somewhat higher than the top of the new roof so that they would be flush with the ceramic tile when eventually installed over his roof. The Shutts accepted Legate's estimate for the roof work, a contract was signed, and the Shutts paid an inital $1,200 installment on March 19, 1998. Legate began work on the Shutts' roof approximately two weeks later. Legate also has a general contractor license, and he also made a proposal to repair wood and plaster inside the Shutts' house that had been damaged over the years by water leaking from the roof above. The Shutts could not afford this proposal and declined. Legate purposely delayed obtaining a building permit to give the Shutts more time to have the parapet walls rebuilt and the new tile installed under the six-month life of the building permit. As Legate's work proceeding, the Shutts paid an additional $1,200 on April 9, 1998, and another $2,000 on May 4, 1998. At approximately the time Legate invoiced the Shutts for the balance due under their contract, a dispute arose regarding the appearance of the roof drain bowls Legate installed. Legate agreed to remove the offending drain bowl, and order and install a type more to the Shutts' liking. On or about June 2, 1998, Legate applied for a building permit. He also requested that they file the notice of commencement so that he could call for a building inspection. At some point (the evidence is not clear when), Legate also wrote the Shutts by certified mail and enclosed a completed notice of commencement for them to sign and file. By letter dated June 5, 1998, an attorney representing the Shutts demanded that Legate not contact the Shutts again and not do any further work on their property because the work done was "inferior and was not of the type desired." Legate complied with the attorney's demand. He did not know exactly what the problem was but assumed it had something to do with the drain bowls. The Shutts did not file a notice of commencement until approximately June 24, 1998. On or about July 6, 1998, someone other than Legate (the evidence was not clear who, but probably the Shutts or their attorney) called for a building inspection of Legate's work. Legate did not know either that the notice of commencement had been filed or that someone had called for an inspection. For that reason, and also because he had been ordered off the job, Legate was not there on July 7, 1998, when a building inspector from the City of St. Petersburg inspected the roof. The Shutts invited the inspector inside the house where he inspected interior water damage and was able to inspect water- damaged wood laths (used to secure ceiling plaster), roof joists and framing beneath one of the roof drains from the underside. The inspector found the roof to be leaking and covering rotted roof framing. He was concerned that it might be dangerous to attempt to place the additional weight of ceramic tile over the roof, especially for the intended use as additional living space (an outdoor, second-story patio.) The inspector determined that it would be necessary to have an on-site inspection with the contractor and a copy of the roofing manufacturer's specifications for the type of roof system applied before final inspection. The building inspector did not contact Legate directly to inform him of the need for an on-site inspection; instead, he left a notice on the building permit at the premises. The inspector was unaware that Legate had been ordered off the premises and would not see the notice. Legate was not aware that an inspection had taken place and did not contact the building inspector. Not having heard from Legate, the building inspector returned to the premises on July 13, 1998, for final inspection without Legate. He saw essentially the same conditions as before and disapproved the work. Legate also was unaware of this second inspection. He never inquired with the City building department as to whether a notice of commencement had been filed or whether the roof had been inspected. On September 15, 1998, the Shutts had the roof inspected by an independent roofing consultant. The independent inspection confirmed the building inspector's findings and added that damage caused by the roof leaks in the meantime had caused additional damage to the roof itself, as well as to the roof substrate (decking) and framing, to the point that it could have been dangerous to attempt to place the additional weight of ceramic tile over the roof, especially for the intended use as an outdoor, second-story patio. The independent roof consultant testified that water was leaking where the metal drip edge had pulled away from the parapets, and there was a gap between the top of the roof material and parapets. He also testified that the drip edges were old and an improper choice for use as flashing where the roof material met the parapets. However, he could not testify as to when the drip edge pulled away from the parapets and apparently was not aware that, for financial reasons, the Shutts had rejected Legate's recommendation to install new metal flashing. The independent roof consultant testified that water also was leaking at the roof drain bowls because they were set too high, causing improper ponding on the roof in the vicinity of the drain bowls. He also testified that, even if the ceramic tile had been installed promptly after Legate's work, the roof drain bowls still should have been flush to the waterproof roofing material, not to the ceramic tile going in over it. However, Legate and his foreman testified that Legate's plan was acceptable and would have made the finished roof watertight. The evidence was not sufficient to prove Legate incorrect. Legate and his workers replaced some rotted roof decking before replacing the roof. They testified that they did not see any more rotted roof framing or joists. While some additional water damage inside the house was evident on September 15, 1998, including rotted ceiling wood lath and joists, it was not clear from the evidence how much was visible or evident to Legate and his workers from their vantage point working on the roof. It is clear, however, that Legate gave the Shutts an estimate for the repair of interior damage, to the extent visible, and that the Shutts declined the repairs for financial reasons. There was no evidence that the Shutts ever complained to Legate that the new roof was leaking. The last Legate heard from the Shutts was their attorney's letter demanding that he not contact the Shutts and not do any more work on the roof. Legate also was unaware of the building inspections and the independent inspection. Legate testified without contradiction that, if he had been aware of the leaks or had been asked, he certainly would have returned to stop the leaks, at least by temporary means, until the additional work contemplated by the Shutts could be done. Section 104.1.1 of the Standard Building Code (1997) requires a contractor to obtain the required building permit before beginning work. There was testimony that the City of St. Petersburg allows builders to "call in" an application for a building permit (by telephone), begin work, and actually obtain the permit within a day or two. But such a procedure would not allow for a delay of months. Section 1503.1.2.1 of the Standard Building Code (1997) requires that roof coverings "provide weather protection for the building at the roof." (The reference to Section 1509 in the Administrative Complaint apparently was a typographical error.) PCCLB has published "Guidelines for Disciplinary Action," which state that $750 is the "typical" penalty for the first "major" infraction and that $300 is the "typical" penalty for the first "minor" infraction. "Major" and "minor" infractions are not defined. The Guidelines also provide that the PCCLB shall consider aggravating and mitigating factors and may take any of the following actions: (1) suspension for a time certain (with possible permission to complete any uncompleted contracts); (2) revocation; or (3) an administrative fine not to exceed $1,000 per count.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Pinellas County Construction Licensing Board enter a final order finding the Respondent, Brian D. Legate, guilty under Count I, fining him $300 under Count I, and dismissing Counts II and III of the Administrative Complaint. DONE AND ENTERED this 25th day of March, 1999, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of March, 1999. COPIES FURNISHED: Williams Owens, Executive Director Pinellas County Construction Licensing Board 11701 Belcher Road, Suite 102 Largo, Florida 33773-5116 Brian Legate 5901 40th Avenue, North St. Petersburg, Florida 33709

Florida Laws (3) 120.52120.54120.56
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE F. GARRARD, 87-004570 (1987)
Division of Administrative Hearings, Florida Number: 87-004570 Latest Update: Mar. 30, 1988

The Issue Whether Respondent should be disciplined for failure to comply with provisions of Florida law?

Findings Of Fact Respondent, George F. Garrard, is licensed as a registered roofing contractor holding State of Florida license number RC 0045805. On May 14, 1986, Respondent entered into a contract with Ronald Skinner to reroof a house located at 2226 Eudine Drive, in Jacksonville, Florida. The contract provided that Respondent would: "Tear off the entire roof to sheeting. Haul off all debris. Install 5 ply-build-up roof. New metal edging." In exchange for the work, the contract called for Respondent to receive $1100.00, $600.00 to be paid in advance for materials and $500.00 to be paid upon completion of the job. 2. Mr. Skinner paid Respondent the $600.00 advance for materials and work on the roof began the following day. While the work on the roof was in progress, Mr. Skinner conducted periodic inspections and noticed that the felt had buckled up. Mr. Skinner asked Respondent how he was going to fix the felt and Respondent said that he could fix the felt by cutting out the buckled parts and patching the felt. Mr. Skinner responded that he had a patched roof before and did not want another; he wanted a new roof. Respondent promised he would fix the problem. Prior to the work being completed, Respondent made a telephone call to Mr. Skinner and asked for payment of the remaining balance on the contract in order to purchase the materials needed to finish the job. Mr. Skinner agreed to meet John T. Garrard (Respondent's son) at the house and pay the balance. Respondent authorized Mr. Skinner to pay John T. Garrard. When Mr. Skinner arrived at the house, John T. Garrard and another person were unloading rocks from a pick-up truck and placing the rocks in a pile on the carport roof. Mr. Skinner paid John T. Garrard $500.00 and John T. Garrard wrote "Paid in Full" on the face of the contract and signed his name. A few minutes after Mr. Skinner left the house, John T. Garrard and the other person also left the house. Two or three days later, Mr. Skinner returned to the house. He noticed that no further work had been done. The rocks which had been unloaded from the pickup truck were still in a pile on top of the carport. Mr. Skinner was afraid the weight of the rocks would damage the carport so he spread the rocks on the roof. There were not enough rocks to cover the whole roof. Also, the rocks were loose because no tar had been spread on the roof to hold the rocks in place. Mr. Skinner contacted Respondent or someone in his household several times, and Respondent assured him he would finish the job. No further work was done on the roof by Respondent. Mr. Skinner last contacted Respondent by letter dated January 26, 1987, wherein he asked that Respondent finish the job since he had been paid in full. On the date of the hearing, the roofing job had not been completed. The rocks were still insufficient to cover the entire roof, no tar had been spread to hold the rocks in place, and the felt was still buckled in various places. Respondent never obtained a building permit for the reroofing job.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a final order finding Respondent guilty of violating Sections 489.129(1)(d) and (k), Florida Statutes, and imposing a fine of $2,000 on Respondent. DONE and ENTERED this 30th day of March, 1988, in Tallahassee, Florida. JOSE A. DIEZ-ARGUELLES Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1988. COPIES FURNISHED: David L. Swanson, Esquire Department of Professional Regulation 120 North Monroe Street Tallahassee, Florida 32399-0750 George F. Garrard 4622 Tabernacle Place, East Jacksonville, Florida 32207 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (2) 120.57489.129
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JERRY E. SMITH, 82-001693 (1982)
Division of Administrative Hearings, Florida Number: 82-001693 Latest Update: Apr. 27, 1983

The Issue Whether Respondent's registered roofing contractor's license should he revoked, suspended or otherwise disciplined based on charges that he violated Ch. 455, Florida Statutes (1979), by (1) abandoning a construction project; making a misleading, deceptive or untrue representation in the practice of his profession; (3) violating local building codes in two instances; and (4) engaging in the business of contracting in a county or municipality without first complying with local licensing requirements.

Findings Of Fact At all times material hereto, respondent held registered roofing contractor's license, number RC 0033215, issued by the State of Florida. The license has been in a delinquent status since July 1, 1981. (Petitioner's Exhibit 1). Between October 1, 1979, and September 30, 1980, respondent held an occupational license issued by the County of Indian River, Florida, which enabled him to engage in the business of roofing contracting in that county. However, this occupational license expired on September 30, 1980. (Petitioner's Composite Exhibit 9). In February, 1981, respondent entered into a verbal agreement with Ezra Grant to repair, for compensation, all leaks in the front and rear sections of the roof on Grant's home, which was located in Sebastian, Florida. (Testimony of Grant). When respondent and Grant entered into this verbal agreement, respondent gave Grant one of his calling cards. On the face of the calling card, in the lower right corner, was written "licensed and insured." (Petitioner's Exhibit 4; Testimony of Grant). At all time material hereto, respondent was not licensed to engage in the business of roofing contracting in the City of Sebastian, Florida. (Petitioner's Exhibit 5). Pursuant to the agreement, respondent performed roof repairs on Grant's home. (Testimony of Grant). Respondent failed to obtain a permit to perform such roof repairs in violation of Section 105.1, Standard Building Code, as adopted by the City of Sebastian, Florida in Section 7-16, Article II, Sebastian Code of Ordinances. (Petitioner's Exhibits 6 and 8a and b). On February 19, 1981, respondent submitted a bill in the amount of $800.00 to Grant for the roof repairs. The bill described the work performed and stated that the "work is guaranteed for 1 year." (Petitioner's Exhibit 2; Testimony of Grant). On February 20, 1981, Grant paid respondent, in full, for the described roof repairs. (Petitioner's Exhibit 3). Approximately two weeks after respondent performed the roof repairs, the roof over the rear portion of Grant's home began to leak, again, in the area where it was repaired. (Testimony of Grant). Respondent returned to Grant's home, on two occasions1 after the discovery of continuing leakage in the roof over the rear portion of Grant's home. However, respondent did not perform roof repairs on either occasion. On the first occasion, he merely removed equipment which he had left at Grant's home. (Testimony of Grant). After Grant complained to petitioner Department of Professional Regulation, respondent returned a second time. He inspected the rear portion of Grant's roof, removed two layers of slate from the roof, and tested it by pouring water over it. Although this test revealed that Grant's roof still leaked, Grant made no effort to repair the leakage. (Testimony of Grant). Arthur Mayer, then the Building Official for the City of Sebastian, observed respondent removing the slate from the roof. He instructed respondent that, upon finishing the work, he should go to the Sebastian City Hall and apply for a roofer's license and a permit for the roof repairs already performed on Grant's home. Respondent promised to comply. (Testimony of Mayer). But, despite his promise, he failed to apply for and obtain a license to engage in the business of roofing contracting in the City of Sebastian, Florida. He also failed to apply for and obtain a roof permit, and pay the proper late fees, as required by Section 107.2, Standard Building Code, as adopted by the City of Sebastian, Florida, in Section 7-16, Article II, Sebastian Code of Ordinances. (Testimony of Mayer; Petitioner's Exhibits 6, 8a and c). Grant, eventually, had his roof repaired by another contractor at a cost of $150.00. (Testimony of Grant).

Recommendation Based on the foregoing, it is RECOMMENDED: That respondent's registered roofing contractor's license be revoked. DONE AND ORDERED this 28th day of February, 1983, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of February, 1983. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Jerry E. Smith Route 1, Box 111B Fellsmere, Florida 32948 James Linnan, Executive Director Construction Industry Licensing Board P. O. Box 2 Jacksonville, Florida 32202

Florida Laws (4) 120.57455.227489.117489.129
# 3
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs JAMES DELAUGHTER, 07-005720 (2007)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Dec. 18, 2007 Number: 07-005720 Latest Update: Aug. 01, 2008

The Issue The issues in this case are whether Respondent engaged in the unlicensed practice of contracting, and, if so, what penalty should be imposed.

Findings Of Fact The Department is the state agency responsible for, inter alia, licensing and monitoring general contractors. Department headquarters are in Tallahassee, Florida. Part and parcel of the Department's duties is the sanctioning of persons who practice general contracting without a license. Respondent is an individual living in Tampa, Florida. Respondent did not appear at final hearing and has not filed any post-hearing motions concerning his failure to appear. The Administrative Complaint filed by the Department makes the following allegations: Respondent was not registered or certified to engage in the practice of contracting. Respondent, doing business as J.D.S. Roofing, contracted with Vivian Virgil to perform certain roofing work, specifically, to remove and replace shingles and related work to reconstruct the roof on Virgil's home. A contract between the parties dated April 21, 2006, was signed by Virgil and Respondent (or his authorized representative). Virgil made two payments to Respondent in the amounts of $2,500.00 (via check number 1037) and $1,564.46 (via check number 1040). She also made a payment of $2,860.54 to The Home Depot to pay for materials ordered by Respondent for Virgil's roofing repairs. Respondent then made the contracted-for repairs and replacement of Virgil's roof pursuant to the contract.2 Virgil, however, was not pleased with the quality of the work. She is unable to get a warranty on the roof because Respondent's work was inferior. Virgil must have another contractor re-do the roof in order to get a warranty. Neither Respondent nor his company, J.D.S. Roofing, is or has ever been licensed by the State of Florida as a contractor. However, Respondent held himself out as a general contractor in his dealings with Virgil.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered by the Department of Business and Professional Regulation finding that Respondent, James Delaughter, is guilty of the unlicensed practice of contracting and imposing a fine of $5,000.00. DONE AND ENTERED this 8th day of April, 2008, in Tallahassee, Leon County, Florida. R. BRUCE MCKIBBEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of April, 2008.

Florida Laws (4) 120.569120.57489.105489.127
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. LEONARD L. CLARK, 82-000052 (1982)
Division of Administrative Hearings, Florida Number: 82-000052 Latest Update: Jan. 31, 1983

The Issue Whether Respondent's activity and conduct in the performance of a roofing contract constitutes abandonment of that contract in violation of Section 489.129(1)(k), Florida Statutes (1979), and whether Respondent willfully or deliberately violated the Volusia County Building Code, thereby contravening Section 489.129(1)(d), Florida Statutes (1979), by failing to obtain a building permit prior to commencing construction of the subject project. Based upon my observation of the witnesses and their demeanor while testifying, the arguments of counsel and Respondent, the Petitioner's proposed recommended order and the entire record compiled herein, I hereby make the following:

Findings Of Fact By its Administrative Complaint signed October 21, 1981, Petitioner, Florida Construction Industry Licensing Board, seeks to take disciplinary action against Respondent and against his license as a registered roofing contractor. Respondent, Leonard L. Clark, is a registered roofing contractor who holds License No. RC 0020933 which has been issued by Petitioner. Respondent does business under the entity Clark Roofing. On January 15, 1981, Respondent entered into a contract with one Mae Coogan, to reroof her residence. The contract specifically required Respondent to "replace any bad wood," and provide a ten (10) year workmanship warranty. (Petitioner's Exhibit No. 1.) Additionally, Respondent agreed to install a 1 x 2 inch strip and a brown aluminum facia at an extra cost of $200.00. (Petitioner's Exhibit No. 1 and testimony of John Coogan.) Mrs. Mae Coogan is an elderly woman and is incapacitated. Her son, John Coogan, who lives with her in her residence, advised her during the negotiations of the subject contract, and testified as a witness in the proceedings herein. Respondent and John Coogan's testimony establishes that construction on the subject project commenced on February 10, 1981, and ceased on March 28, 1981. At that time, based upon Respondent's representation that the job was complete, Mr. Coogan paid Respondent the entire $2,500.00 due under the terms of the contract. Shortly thereafter, Mr. Coogan discovered evidence of "bad" or "rotten wood." Mr. Coogan immediately apprised Respondent of this, whereupon Respondent initially told him that he would be back to the job site to take care of any problems that existed with the reroofing project. There is conflicting evidence as to whether or not there was a subsequent telephone conversation between Respondent and Mr. Coogan following a letter which Respondent found offensive. Respondent claims that there was such a conversation and that the parties became angry at each other. At that juncture, the parties were unable to resolve their differences. Efforts by the parties to resolve their differences reached a stalemate, and Respondent did not again visit the project site or otherwise inspect the claimed damaged by Mr. Coogan. Mr. Coogan, to substantiate his claim that there was in fact rotten or bad wood left exposed in the overhang, rafters and beams surrounding the roof, introduced several photographs which depicted the condition of the wood on the roof. (Petitioner's Composite Exhibit No. 3.) Respecting the fact that there was rotten wood, as claimed by Mr. Coogan, in the rafters and overhang, Respondent admitted the existence thereof. There is also a question about the possibility of rotten wood being covered by Respondent's employees and not replaced as required by the contract. The particular area in question is a portion of a flat roof which sagged in several places. Mr. Coogan claims that he had been advised that this was due to rotten wood underneath the shingles in an area in which he specifically claims to have asked Respondent to allow him to inspect the exposed-wood surface prior to the time in which it was covered with asphalt shingles. Respondent's workers covered this area of the roof without permitting Mr. Coogan the opportunity to inspect it. Mr. Coogan testified that the roof continued to sag in the identical places where it sagged prior to the reroofing. In this regard, Respondent admits that he might have agreed to allow Mr. Coogan an opportunity to inspect the exposed roof once the shingles were removed and prior to the time that he recovered (reroofed) the flat roof. Respondent further testified that this was not due to any effort on his part to conceal or otherwise hide rotten wood and, in fact, he claimed to have covered or replaced any bad or rotten wood. In this regard, Mr. Coogan noticed at least four water leaks from his roof prior to the time that Respondent reroofed his mother's house; however, he testified, on cross-examination, that he has not seen any leaks since Respondent has completed the subject project. Bob McConnell, Volusia County Building Inspector for approximately five years, inspected the roofing job completed by Respondent for Mrs. Coogan on July 28, 1981. Mr. McConnell found that the roofing job did not comply with the contract in the following regards: The 1 x 2 inch strip beneath the brown aluminum facia, called for as an extra, was not installed; There was visible rot in the sheathing; A short hip (rafter) was replaced with unsound wood; and A rafter tail had visible rot. In this regard, Mr. McConnell, while also reporting that there were soft spots in the built-up roof, could not testify with certainty that they were the result of wood rot. Respondent testified that he has tried to contact Mr. Coogan on several occasions to correct any claimed deficiency. Respondent stands, at this time, willing to correct any deficiency that exists or to correct any problem which stems from his deviation from the contract. In this regard, Respondent has offered, and no offers, to remove the shingles from the entire roof and allow for it to be inspected by Respondent or any designated roofing contractor whom Coogan or Petitioner selects. Respondent will replace any "bad" or "rotten" wood which he has been claimed to have covered. However, Respondent expects to be paid for reroofing this job in the event that in an inspection reveals that no "bad" or "rotten" wood was covered as Mr. Coogan and Petitioner claim. Inspector McConnell has known Respondent in excess of twenty-five (25) years and is unaware of any claim that Respondent has performed any unworkmanlike or "shoddy" roofing repairs. Finally, in this connection, Respondent introduced letters from three (3) area builders who attested to Respondent's excellent workmanship. (Respondent's Composite Exhibit No. 3.)

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby RECOMMENDED: That the Respondent be placed on probation for a period of two (2) years and that the term of probation be suspended for a period of sixty (60) days, during which time Respondent shall be allowed an opportunity to return to the Coogan residence and replace any existing exposed "rotten" or "bad" wood which should have been replaced pursuant to the terms of the contract. In the event that the Respondent properly completes the replacement of the rotten or damaged wood on this project, following an inspection by one of Petitioner's agents, it is further RECOMMENDED: That the entire term of the probation be suspended. In the event that Respondent fails to properly complete this project, following an inspection by one of Petitioner's agents, it is further RECOMMENDED: That the entire term of probation be instituted without the necessity of further hearing. RECOMMENDED this 11th day of August, 1982, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of August, 1982.

Florida Laws (2) 120.57489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. REX ALANIZ, 84-001953 (1984)
Division of Administrative Hearings, Florida Number: 84-001953 Latest Update: Jan. 11, 1985

Findings Of Fact Respondent has been licensed as a registered roofing contractor at all times relevant to this proceeding. His license number is RC0042041. On August 30, 1982, Respondent contracted with the Julien P. Benjamin Equipment Company of Jacksonville, Florida, for the rental of an asphalt kettle. Respondent executed this contract in the name of his roofing and remodeling business. When Respondent failed to return the kettle or make rental payments, the equipment company filed a complaint with the State Attorney. Respondent subsequently entered a plea of guilty to the charge of Grand Theft, second degree, and was placed on 18 months probation, by order of the Duval County Circuit Court dated May 16, 1983. Respondent returned the kettle and paid the rental fees in March 1983.

Recommendation Based on the foregoing, it is RECOMMENDED: That Petitioner enter a Final Order suspending Respondent's roofing contractor's license for a period of one year. DONE AND ENTERED this 24th day of August 1984 in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of August 1984. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Rex Alaniz 23 Seatrout Street Ponte Verde Beach, Florida 32082 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Mr. Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (1) 489.129
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs DARRYL S. SAIBIC, 95-001079 (1995)
Division of Administrative Hearings, Florida Filed:Miami, Florida Mar. 06, 1995 Number: 95-001079 Latest Update: Mar. 25, 1996

Findings Of Fact Jurisdiction findings Petitioner is the state agency charged with regulating licenses for roofing contractors in the State of Florida. At all times material to the allegations of these cases, Respondent held two licenses; he was a certified roofing contractor, license no. CC CO55580, and a registered roofing contractor, license no. RC 0060386. Respondent filed an application to qualify the company, D.S.S. & Sons, Inc., as a licensed roofing contractor; however, he failed to complete all documents necessary for licensure, and his application was closed for lack of response effective August 3, 1993. Respondent's address of record with the Department is 821 SW Dwyer Street, Port St. Lucie, Florida 34983. D.S.S. & Sons, Inc. is not now, nor has it ever been, licensed to perform roofing construction by the State of Florida. Facts common to all consumers On or about August 24, 1992, Hurricane Andrew struck Dade County, Florida, resulting in damage to hundreds of roofs. Roof repair or total replacement following the storm was not uncommon. Due to the large amount of damage, and the demand for roofing materials created by the volume of work to be performed, some contractors had difficulty obtaining roofing supplies. Additionally, some contractors had difficulty hiring qualified labor to perform the extensive roofing that was in great demand. The problems with obtaining materials and labor, however, were short term in that most roofing contractors made arrangements to bring in supplies and staff from other areas. In fact, by the time the work was to be performed in connection with these cases, the problems which had plagued the Dade County contractors were subsiding. Additionally, at all times material to these cases, the weather would not have been a factor to justify the delays complained of by these consumers. Rainy weather did not cause any prolonged work delays after the storm. Findings as to Helmly Charles Helmly resides at 11985 SW 98th Lane, Miami, Florida. His home was damaged by Hurricane Andrew and required roof replacement. Mr. Helmly contracted with Respondent to re-roof his home for the sum of $17,940.00. The contract was signed by Respondent's salesman, Felix Fowler, and identified D.S.S. & Sons, Inc. doing business as Darryl Saibic, Roofing Contractor as the licensed entity. Mr. Helmly paid an initial deposit of $5,382.00 in order for the Respondent to begin work on the project. The next payment, an additional $5,382.00, was to be due at the "dry in" stage of the job, with the final payment (the balance) due on completion. One of the contract provisions Mr. Helmly insisted upon was a completion deadline to be stated in the contract. He was expecting visitors and he was anxious to have the home re-roofed before their arrival. He insisted that a guaranteed completion date of March 7, 1993 be noted on the face of the contract. Mr. Helmly complied with all requirements of the payment schedule outlined by the contract. In fact, he remitted $10,764.00 even though the roof had not been at the "dry in" stage. Between January and February, 1993, the Respondent removed the old roof, installed a base sheet, and nailed a single ply roof membrane to the roof. After February, 1993, the Respondent failed to timely complete the Helmly roof. The value of the work performed by Respondent on the Helmly roof was no more than $3,588.00. The Respondent did not respond to numerous telephone calls and letters from Helmly, and threatened to place a lien on the Helmly property when Mr. Helmly attempted to cancel the contract in May, 1993. Mr. Helmly went to the Dade County Building Department and complained about roof leaks in June, 1993 (Respondent had still not done any further work). On or about June 4, 1993, Respondent sent a crew to the Helmly property to repair the roof. The repairs caused the roof to leak more. Respondent did not refund Mr. Helmly's money, did not complete the roof, and showed a gross indifference to the plight which resulted when he failed to timely complete the project. In July, 1993, desperate to have his roof completed, Mr. Helmly offered to purchase the tiles himself if Respondent would have a crew come install the new roof. Respondent agreed to have a crew install the tile within ten days of its arrival. On September 17, 1993, Mr. Helmly took delivery of the new tile, paid for it in full (a cost of $4,803.00) and notified the Respondent so that the installation could begin. Respondent never returned to complete the re-roofing. He failed to honor his verbal agreement to install the tiles. By letter dated October 1, 1993, Respondent offered to reimburse Helmly for the overage if he would hire another contractor to complete the job. On October 19, 1993, Mr. Helmly hired a new contractor who completed the installation of the new roof in early November, 1993. Approximately eight months after the deadline on Respondent's contract, Mr. Helmly had his new roof. Extra expenses totalling $2,936.21 were paid by Mr. Helmly as a result of the Respondent's abandonment of this job. Findings as to Gurdian On January 14, 1993, the Gurdians contracted with Respondent through his agent, Ed Comstock, to repair the roof on their home located at 13301 SW 110 Terrace, Miami, Florida. The contract was executed as D.S.S. and Sons, Inc. d/b/a Darryl S. Saibic, Roofing Contractor and called for a total payment of $7,725.00 for the work to be done. The Gurdians made a deposit of $2,300.00 on January 14, 1993 by check made payable to D.S.S. and Sons, Inc. and received a partial release of lien. On February 8, 1993, the Respondent pulled a permit for the Gurdian home but never called for inspections on this project. In February, 1993, all the tiles were removed from the roof and roofing paper was installed. On March 1, 1993, the Gurdians made a second payment of $2,300.00 by check made payable to D.S.S. and Sons, Inc. and received another partial release of lien. The Respondent did not timely complete the Gurdian roof. From June through November, 1993, Respondent sent the Gurdians unsigned notices claiming he would return to their job but did not do so. Numerous excuses were offered as to why the project was not completed; however, none of these had merit. The Gurdians waited until April, 1994 hoping the Respondent would return and complete the work. They drove to Respondent's office and left a message seeking assistance. Finally, Respondent recommended a company called CTI to complete the roof work for the Gurdians. When contacted, CTI told the Gurdians it would cost $7,600.00 to complete their job for which they, not Respondent, would be responsible. The Gurdians then attempted to notify the Respondent at his address of record by certified mail of their continuing problems but the letter was returned to them unopened. In June, 1994, the Gurdians hired another company to finish their roof which was finally complete and passed inspections on July 26, 1994. The Gurdians were required to pay a total of $13,475.00 to have their roof replaced because the Respondent failed to perform under the original contract. Due to the Respondent's abandonment and indifference in connection with this project, the Gurdians were damaged in an amount not less than $4,200.00. The value of the work performed by Respondent on the Gurdians' roof did not exceed $1,545.00. Respondent has not refunded any of the funds paid by the Gurdians. Findings of fact as to Vila Marta Vila resides at 11116 SW 133 Place, Miami, Florida 33186. Like the others discussed above, the Vila home was damaged and required a new roof. On January 13, 1993, Vila signed a contract with Ed Comstock acting on behalf of D.S.S. and Sons, Inc., doing business as Darryl S. Saibic, Roofing Contractor, to have her roof repaired for a total contract price of $7,200.00. A down payment of $2,160.00 made payable to the company was made at that time. On February 8, 1993, Respondent pulled a permit to re-roof the Vila home. On February 15, 1993, Vila paid an additional $2,160.00 to Respondent. At that time Respondent removed the tiles from the Vila roof and installed one layer of roofing paper over the roof decking. Despite representations from Respondent that new tiles would be delivered in approximately three to four weeks, the Respondent did not install a new roof on the Vila home. In February and March, 1993, the roof was patched three times to stop leaks but no substantive work was performed to install new tiles. Respondent did not return to the Vila home despite numerous requests from the homeowner for the work to be completed. In June, 1993, Respondent represented that the Vila job might be completed if the tiles were sent out COD. When Vila attempted to verify that information, she was told she had paid enough to not have that concern. However, no tiles were ever delivered to her home. In August, 1993, Vila, after Respondent failed to return telephone calls, wrote to Respondent and demanded a refund. She has not received one. Vila ended up paying $7,754.00 to another contractor to have her roof replaced. The value of the work performed by Respondent on the Vila project did not exceed $1,440.00 yet he has failed or otherwise refused to refund the difference between that amount and what she paid. Vila has suffered monetary damages in an amount not less than $4,800.00 as a result of Respondent's abandonment of this project. Findings of fact as to Bermudez Mr. and Mrs. Bermudez reside at 8335 SW 147th Place, Miami, Florida. On November 30, 1992, they signed a contract with Respondent in the amount of $6,400.00 to correct extensive leakage on both floors of the Bermudez home. Mrs. Bermudez gave a deposit in the amount of $1,860.00 and was told that the repairs would begin in two weeks and be completed in approximately five weeks. In December 1992, and January, 1993, the Respondent performed some minor patching but no significant work was undertaken to repair the Bermudez home. In January, 1993, Respondent pulled a permit to replace the Bermudez roof. Within a week of the permit, Respondent sent an unsigned form letter to the Bermudez advising them that there would be delays. In February and March, 1993, the Respondent's crew stripped the old tile off the Bermudez home and installed batten and roofing paper over the decking. Mrs. Bermudez made deposits totalling $3,720.00 to Respondent in connection with this contract. Despite numerous requests from Mrs. Bermudez, Respondent did not complete the roof. In July, 1993, Respondent sent a crew to the Bermudez home in connection with a leak but the repair did not resolve the problems and did not substantively finish the roof. As with the other cases, between July and November, 1993, Respondent sent numerous unsigned form letters to Mrs. Bermudez offering false or ridiculous excuses for why the project had not been completed. In January, 1994, Mrs. Bermudez filed a formal complaint against Respondent but he never completed the job nor refunded the deposits. Between March and July, 1994, Respondent represented he would complete the Bermudez job but did not do so. The Bermudez roof was not completed until December 13, 1994. As a result of Respondent's incompetence, inability, or refusal to complete the Bermudez roof, the family lived with a leaking roof for approximately two years and incurred unnecessary expenses. Respondent showed a gross indifference to the plight of the Bermudez family. Respondent could not have timely completed the projects described above during the period July, 1993 to July, 1994, as his workers compensation had expired. The numerous promises to perform the contracts as originally agreed were meaningless.

Recommendation Based on the foregoing, it is, hereby, RECOMMENDED: That the Department of Business and Professional Regulation, Construction Industry Licensing Board enter a final order revoking Respondent's licenses, requiring Respondent to make full restitution to the consumers in these cases before being entitled to seek new licensure, imposing an administrative fine in the amount of $10,000, and assessing costs of investigation and prosecution of these cases as set forth in the affidavits filed in this cause. DONE AND RECOMMENDED this 25th day of October, 1995, in Tallahassee, Leon County, Florida. JOYOUS D. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of October, 1995. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 95-1079, 95-1080, 95-1081, 95-1082 Rulings on the proposed findings of fact submitted by the Petitioner: 1. Paragraphs 1 through 155 are accepted. Rulings on the proposed findings of fact submitted by the Respondent: 1. None submitted. COPIES FURNISHED: Elizabeth Masters Senior Attorney Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 230 Jacksonville, Florida 32211 Darryl Saibic 821 S.W. Dwyer Road Port St. Lucie, Florida 34983 Richard Hickok Executive Director Department of Business and Professional Regulation Construction Industry Licensing 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (2) 489.1195489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID MORTON, 82-002861 (1982)
Division of Administrative Hearings, Florida Number: 82-002861 Latest Update: Dec. 04, 1990

The Issue By Administrative Complaint filed on March 24, 1982, the Petitioner, Department of Professional Regulation, charged the Respondent, David Morton, with specific violations of Florida Statutes and Section 81-64 of the City of Hollywood Ordinances. The charged violations generally involve the alleged failure of Mr. Morton to obtain building permits prior to performing roofing repairs and failure to honor and make good certain guarantees that he gave on two roof repair jobs. Petitioner presented the testimony of Carol Glovan, of the City of Hollywood Building Department; Maurice Segall, complainant; and Hershal K. Deuchare, complainant. Petitioner's Exhibits 1 through 7 were received into evidence. Respondent failed to appear and, therefore, presented no witnesses or documentary evidence on his behalf. The counsel for the Petitioner submitted proposed findings of fact and conclusions of law for consideration by the Hearing Officer. To the extent that those proposed findings of fact and conclusions of law are not adopted in this order, they were considered and determined to be irrelevant to the issues in this cause or not supported by the evidence.

Findings Of Fact Respondent is a registered roofing contractor having been issued License No. RC0030473. David Norton was first licensed as a registered roofing contractor in July, 1977. License No. RC0030473 was issued to David Morton qualifying David Morton Roofing, 6422 Southwest 24th Street, Miramar, Florida 33023. Since qualifying David Morton Roofing, the Respondent has changed business addresses but has not qualified any other business name for the purpose of performing work under his license. On May 8, 1980, the Respondent contracted with H. Deuchare to perform repairs on the roof of the Deuchares' home located at 5521 Buchannon Street, Hollywood, Florida. The contract price was $500. The written contract dated May 9, 1980, and attached as a part of Petitioner's Composite Exhibit No. 3, reflects that the name in which the Respondent was doing business at that time was "David M. Roofing." The contract also provided for a one-year guarantee against faulty material and workmanship. Respondent performed the roof repairs on the Deuchare home but failed to obtain a permit for the work as required by Section 81-64, City of Hollywood Ordinances. After completion of the work, the roof continued to leak, and after two calls from Mr. Deuchare, the Respondent came out and attempted to repair the work. Following this repair effort, the roof leaked worse than before. After continuing calls, the Respondent finally got the leak fixed. However, during the course of making the final repair, the Respondent removed tiles from the roof and broke certain of the tiles. Following completion of the repair, Respondent did not put the tiles back in place and refused to come back and replace the broken tiles. The Respondent made a total of three repair visits to the Deuchare home and on the occasion of each call, was very cordial. On April 22, 1981, Respondent contracted with Maurice Segall to perform roof repairs on the Segalls' home located at 4400 Lincoln Street, Hollywood, Florida. The contract price was $1,075.00. The contract which is attached to Petitioner's Composite Exhibit 4 is dated April 22, 1981, and reflects that the Respondent was doing business in the name of David M. Roofing. The contract also provided for a guarantee for seven years against faulty material and workmanship. The Respondent performed the work on the roof but failed to obtain a building permit prior to beginning the work as required by Section 81-64, City of Hollywood Ordinances. A building permit was later obtained after the repairs were completed. After the Respondent performed the work, the roof continued to leak, and after many calls, Respondent sent someone out to make additional repairs. After Mr. Segall initiated an action with the county licensing board, Mr. Morton did come out and do the roof over again and performed the work in a proper manner. Mr. Morton did obtain a proper hermit prior to performing the work the second time. No charge was made to Mr. Segall for the work performed in redoing the job. Following this work, the roof did not leak.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Construction Industry Licensing Board enter a Final Order finding Mr. David Morton to have violated Florida Statutes 489.129(1)(d) and Florida Statutes 489.119. It is further recommended that the Board impose an administrative fine upon the Respondent of $250 and that the Respondent be placed on probation for a period of six months. RECOMMENDED this 11th day of April, 1983, in Tallahassee, Florida. MARVIN E. CHAVIS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of April, 1983. COPIES FURNISHED: Michael J. Cohen, Esquire Suite 101, Kristin Building 2715 East Oakland Park Boulevard Ft. Lauderdale, Florida 33306 Mr. David Morton 6432 S.W. 24th Street Miramar, Florida 33023 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. James Linnan Executive Director Post Office Box 2 Jacksonville, Florida 32202

Florida Laws (3) 455.227489.119489.129
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs RICHARD MCDOUGAL, 90-007120 (1990)
Division of Administrative Hearings, Florida Filed:Chipley, Florida Nov. 08, 1990 Number: 90-007120 Latest Update: Apr. 19, 1993

Findings Of Fact Respondent is Richard McDougal, holder, at all times pertinent to these proceedings, of registered roofing contractor license no. RC 0050466. Petitioner is the Department of Professional Regulation, Construction Industry Licensing Board, the state agency charged with the regulation of contractors in the State of Florida. Respondent was the qualifying agent for D & R Roofing Co., at all times pertinent to these proceedings. On July 31, 1989, Arla Jackson signed and accepted Respondent's written proposal to re-roof a house belonging to Jackson, located in Washington County, Florida. Prior to engaging Respondent to re-roof the house, Jackson had only a minimal amount of leakage in a couple of corners inside the house. Under the terms of the written proposal provided by Respondent to Jackson, Respondent agreed to remove the old roof covering from the structure; install a new three ply fiberglass felt covering; install new eave metal around the roof perimeter; extend the roof a short distance at one end; and top coat a utility building on the premises. Further, Respondent agreed to haul away debris resulting from the job. Completion of the roofing project by Respondent and receipt of payment from Jackson in the amount of $3,000 occurred on August 9, 1989. $2,900 of this amount was payment to Respondent for replacing the old roof while the remainder satisfied charges by Respondent for additional work required to extend the roof. Shortly after Respondent's completion of the roof replacement, Jackson began to telephone Respondent, requesting that he come and repair holes in the roof that were leaking water as the result of rain. Respondent came to Jackson's house on at least three occasions to attempt to stop leaks in the roof. He eventually determined that he had stopped the leaks and told Jackson that, as far as he was concerned, there was no roof leakage problem. Jackson's flat roof continued to leak. Eventually, Gus Lee, an unlicensed roofing assistant to H.M. Strickland, a local licensed contractor, agreed to repair her roof and eliminate the leakage problem. Strickland's signature appears with Lee's on written documentation bearing the date of October 1, 1989, and promising a "fine roof with no leaks; and I will stand behind it." Jackson accepted the Strickland offer. Jackson paid approximately $1,925.00 to Lee for work in connection with replacing the roof and painting the interior ceiling of the house. She paid an additional $653.79 for building supplies in connection with the project. Overall, Jackson paid approximately $2,578.79 for labor and materials to re-roof her house and repair the interior ceiling damage resulting from the leakage. This amount was in addition to the amount previously paid to Respondent. On October 20, 1989, Lee, the unlicensed assistant to Strickland and the person who actually undertook the task of re-roofing Jackson's house, removed the previous roofing material placed on Jackson's house by Respondent. Lee observed no fiber glass felt covering material on Jackson's roof at the time he re-roofed the house. Lee's testimony at hearing was credible, candid and direct. Although unlicensed as a contractor, Lee's attested experience supports his testimony regarding what he observed and establishes that Respondent failed to comply with his agreement to Jackson to provide fiber glass felt during the initial roofing of the house and instead used a less expensive material. Lee's testimony, coupled with that of Jackson and Lee's son, also establishs that significant damage had occurred to the interior ceiling of Jackson's house as the result of leakage after completion of work by Respondent. After Lee completed the re-roofing of Jackson's home, inclusive of use of a six ply felt covering on the roof accompanied by pea gravel and sealant, the roof's leakage stopped.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that a Final Order be entered imposing an administrative fine of $1500 upon Respondent's license as a registered roofing contractor. DONE AND ENTERED this 25th day of November, 1991, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Fl 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of November, 1991. APPENDIX TO RECOMMENDED ORDER The following constitutes my specific rulings, in accordance with Section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner's Proposed Findings. 1.-4. Adopted, though not verbatim. 5.-8. Subordinate to Hearing Officer's Conclusions. 9.-11. Adopted in substance, though not verbatim. Respondent's Proposed Findings. None submitted. COPIES FURNISHED: Robert B. Jurand, Esq. Department of Professional Regulation The Northwood Centre, Suite 60 1940 N. Monroe St. Tallahassee, FL 32399-0792 Richard McDougal Box 10277 Panama City, FL 32404 Daniel O'Brien, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, FL 32201 General Counsel Department of Professional Regulation The Northwood Centre, Suite 60 1940 N. Monroe St. Tallahassee, FL 32399-0750

Florida Laws (2) 120.57489.129
# 9

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer