Findings Of Fact Based on my observation of the witnesses and their demeanor while testifying, the documentary evidence and the positions of the parties, I hereby make the following: Thomas G. Walker (herein sometimes called "Licensee" or "Respondent") is a registered residential contractor and is issued license number RR 0009839. Thomas G. Walker was initially licensed by the Board in July of 1969 as an individual and during January, 1975, he changed his registration status as an individual to qualify Insulshield Roofing as the business entity through which he would conduct his business (Petitioner's Exhibit No. 1). An examination of the official records pertaining to the Licensee reveals that he does not now nor has he ever held a roofing license in the State of Florida. On February 16, 1979, the Licensee was apprehended contracting roofing without a State roofing contractor's license by the Board's representative and was issued a Notice of Violation (Petitioner's Exhibit No. 3). On July 26, 1977, the Licensee entered into an agreement with Jan Soderstrom, 501 Orlando Avenue, Indialantic, Florida, to remove the tile from the Florida Room of her residence and hot mop the herein-described roofing area, to replace tile as needed, to clean and coat the entire roof, and to install a cap over Ms. Soderstrom's chimney. He guaranteed the work for a period of five (5) years and charged a contracted price of $800.00. The Licensee was paid the contracted price of $800.00 by check dated August 4, 1977 (Petitioner's Exhibit No. 5). During early February, 1978, Ms. Soderstrom detected a leak in her roof and summoned the Licensee back to her residence to repair same. During February, 1978, Respondent returned to Ms. Soderstrom's residence to repair the leak in her roof. Upon his return, he removed several roof tiles and since February, 1978, to the present, he has not returned to this project. Clyde Pirtle, a field investigator for the Board, investigated the Licensee based on complaints that he received from Ms. Soderstrom and from a Mr. Capitz. On or about February 16, 1977, Mr. Pirtle discussed a Notice of Violation with the Licensee and explained to him the necessity to register as a Roofing Contractor, if he was in the business of acting as a Roofing Contractor. Mr. Charles D. Franklin, a building official of Indian Harbor Beach, Florida, is the custodian of the records in Indian Harbor, Florida. Based on an examination of the records by Mr. Franklin, the Respondent/Licensee is not registered as a Roofing Contractor locally.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby, RECOMMENDED: That the registered residential contractor's license, number 0009839, of the Licensee, Thomas G. Walker, d/b/a Insulshield Roofing, be suspended for a period of one (1) year. RECOMMENDED this 4th day of April, 1979, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 2400 Independent Square Jacksonville, Florida 32202 Thomas G. Walker d/b/a Insulshield Roofing 170 5th Street South Melbourne Beach, Florida 32951 J. K. Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211
The Issue Whether Respondent committed the violation alleged in the Administrative Complaint? If so, what punitive action should be taken against Respondent?
Findings Of Fact Based upon the evidence adduced at hearing, and the record as a whole, the following findings of fact are made: Respondent is a roofing contractor. He is now, and has been at all times material to the instant case, licensed to engage in the roofing contracting business in the State of Florida. He has held license number CC C049569 since 1989. In the eight years that he has been licensed, he has been disciplined once. On January 28, 1993, Respondent was issued a Uniform Disciplinary Citation alleging that, "on the 8th day of July, 1992, and the 19th day of August, 1992, [he] did violate the following provisions of law: Section 489.129(1)(j), Florida Statutes (1991), by violation of Section 489.119(5)(b), Florida Statutes (1991), by committing the following act(s): failing to include a license number on a contract and failing to include a license number on an advertisement at: 771 S.W. 61st Terrace, Hollywood, Florida 33023." Respondent did not contest these allegations. Instead, he chose to pay a $200.00 fine for having committed the violations alleged in the citation. Respondent is now, and has been since February 21, 1990, the primary qualifying agent for Ray Guy Roofing, Inc., a roofing contracting business owned by Respondent and located in Hollywood, Florida. Respondent's brother, Rodney Guy (Rodney), is also in the roofing business in the South Florida area. At all times material to the instant case, Rodney engaged in such business under the name "Hot Rods Roofing." In addition to having his own business, Rodney also, on occasion, worked for Respondent. In August of 1992, Rodney entered into a written agreement (Contract) with Christopher Klein in which Rodney agreed, for $7,000.00, to replace the damaged roof on Klein's residence in Dade County1 with a new roof with a seven-year warranty (Project). Subsequently, the Contract price was increased $500.00 to $7,500.00 by mutual agreement. Prior to the commencement of work on the Project, Respondent verbally agreed to assume Rodney's obligations under the Contract. Klein paid the Contract price in full, by check, in two installments. Both checks were made out to Hot Rods Roofing (in accordance with the instructions Klein was given) and cashed by Rodney. The second check contained the following handwritten notation made by Klein: "payment in full - roof - includes Ray Guy Roofing, Inc." The Project was completed on or before September 18, 1992. The work was done by Respondent and the employees of Respondent's roofing business, including Rodney. Following the completion of the Project, the roof started to leak. Klein thereafter unsuccessfully attempted to contact Respondent and Rodney by telephone to apprise them of the situation. On or about August 1, 1993, Klein sent a letter to Respondent and Rodney advising them of the leaks in the roof and requesting that they "send someone to fix them." Neither Respondent nor Rodney responded to Klein's letter. Klein therefore hired someone else to fix the leaks. Leaks subsequently redeveloped in the roof. Klein again unsuccessfully attempted to contact Respondent and Rodney by telephone to bring the matter to their attention. On or about March 22, 1994, Klein sent Respondent and Rodney a letter, which read as follows: As you will recall, you acted as partners in the installation of a new roof at my house after Hurricane Andrew. I have developed a leak and I have been attempting to contact both of you for over a month in connection with warranty work related thereto. I am surprised that you have ignored me because, as you will recall, my hiring you resulted in your obtaining at least 3 other jobs on my street. Please contact me within one week to schedule the repair. If I do not receive word from you, I will be forced to hire another roofing company and I will thereafter send you the bill. The bill will be for the roof repairs and to repair interior damage. Neither Respondent nor Rodney responded to Klein's request. Klein made temporary repairs to the roof at his own expense. Klein, who is a member of The Florida Bar, subsequently filed a complaint in Dade County Court (in Dade County Court Case No. 95-7415 CC 02) seeking a judgment for damages, plus interest and costs, against Ray Guy Roofing, Inc., Respondent, and Rodney for breach of contract (Count I), negligence (Count II), and breach of warranty (Count III). Respondent was served with a copy of the complaint on or about May 12, 1995. Shortly thereafter Klein received a telephone call from Respondent, who wanted to speak to Klein about the lawsuit. During their telephone conversation, they agreed to meet at 5:30 p.m. on May 17, 1995, at Klein's residence to discuss the possibility of settling the lawsuit. Respondent did not show up for the meeting, nor did he telephone or otherwise communicate with Klein to explain his absence. Respondent also failed to respond to Klein's complaint.2 On June 30, 1995, pursuant to Klein's written request, a Final Default Judgment was entered against Respondent and Ray Guy Roofing, Inc.,3 in Dade County Court Case No. 95-7415 CC 02. The Final Default Judgment provided as follows: THIS CAUSE came before the Court this date on Plaintiff's Motion for Final Default Judgment against Defendants Raymond Guy, Individually and Ray Guy Roofing, Inc., and the Court having noted that said Defendants were duly served and defaulted herein, and the court being otherwise duly advised in the premises, it is thereupon ORDERED that Plaintiff's Motion is granted and that Plaintiff, Christopher J. Klein, hereby recovers from Defendants, Ray Guy Roofing, Inc., and Raymond Guy, Individually, the principal sum of $5,500.00 plus costs in the sum of $198.00, making a total sum due of $5,698.00, for which sum let execution issue. Klein sent a copy of the Final Default Judgment to Respondent by United States Mail on or about July 21, 1995. The Final Default Judgment was not appealed, and it has not been vacated, set aside, discharged, or satisfied, in whole or in part.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department issue a final order (1) finding Respondent guilty of the violation of Section 489.129(1)(r), Florida Statutes, alleged in the Administrative Complaint, and (2) disciplining Respondent for having committed this violation by requiring him to: (a) pay a fine of $1,000.00; submit proof of satisfaction of the Final Default Judgment entered in Dade County Court Case No. 95-7415 CC 02; and reimburse the Department for all reasonable costs associated with the Department's investigation and prosecution of the charges set forth in the Administrative Complaint. DONE AND ENTERED this 25th day of September, 1997, in Tallahassee, Leon County, Florida. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1997.
Findings Of Fact Bruce A. Williams, Respondent, is the holder of a registered roofing contractor's license from the Florida Construction Industry Licensing Board. The license number is CC C020246. Respondent is vice president of Dean Roofing and Sheet Metal, Inc. (The Dean Company), Post Office Box 2077, Clearwater, Florida. By proposal submitted March 31, 1983, and accepted by Marshall Kent on April 1, 1983, the Dean Company contracted to remove the existing roof on Kent's residence and replace same at a price of $8,600 (Exhibit 1). The work was supposed to start April 11, 1983 and be completed on April 15, 1983. This contract was signed on behalf of Dean Company by Bruce A. Williams, Respondent, as vice president of Dean Company and by Marshall Kent. Kent is an experienced residential contractor who acknowledged having built approximately 2,000 homes. While removing the existing roof, Dean Company workers found the 30-year old house had three plys of roofing applied since the house was constructed and to remove this thick roof heavier equipment that normal was required. Kent's residence had a tectum roof decking which consists of a metallic-fiber substance which has a long life and serves as inside ceiling and outside roof decking over which built up roofing is applied. While removing the existing roof the tectum deck was fractured and Kent ordered Dean Company workers off the Job. By letter dated April 18, 1983 (Exhibit 6) Respondent advised Kent that the cost of replacing the damaged tectum would be borne by the Dean Company and it was necessary to get on with the project before additional damage was done through the areas of roof exposed by removal of the original roof. Upon seeing Exhibit 6, K. A. Williams, president of Dean Company and father of the Respondent, concluded that the problems may have been exacerbated by a personality conflict between Respondent and Kent, and turned the job over to R. L. MacMurry, another vice president at Dean Company, who had considerable experience in the roofing business. By letter dated Apri1 19, 1983 (Exhibit 7) MacMurry, on behalf of Dean Company, advised Kent that since he questioned their ability to properly install the new decking to replace the damaged decking they would employ the services of a general contractor to replace the damaged tectum, and if the replaced tectum did not match the original tectum they would have the entire ceiling painted. Kent denies receiving this letter. Kent refused these offers and by letter dated April 21, 1983 "Exhibit 8) R. A. Williams pointed out that Kent's refusal to allow Dean Company to immediately complete the roofing work in progress could lead to serious damage from water intrusion and that such damage would be Kent's responsibility. On Friday, April 29, 1983 a meeting was held between the Kents, Williams and MacMurry at which Dean Company -agreed to immediately recommence roof work, bring in a general contractor to replace the damaged decking and complete the contract. Kent demurred until the agreement was reduced to writing, preferably by an attorney. Kent prepared an endorsement on Exhibit 9 in which responsibility for the repairs was, in Kent's opinion, shifted to the general contractor. This endorsement was accepted by the parties on May 3, 1983. The residence was reroofed in accordance with the latter agreement and Kent never advised Dean Company that all work was not satisfactorily completed. Dean Company provided Kent with a five (5) year Roofing Guarantee (Exhibit 11) dated May 10, 1983, which was forwarded to Kent by letter dated May 11, 1983 (Exhibit 10) with an invoice for the total owed on the job (Exhibit 14). Kent responded with letter dated May 17, 1983 (Exhibit 23) contending he was not whole, the job was not. complete and the guarantee was a joke. Kent considered the Roofing Guarantee suspect because it was a form used by the Midwest Roofing Contractor's Association. Shortly after this time Kent was hospitalized for psychiatric treatment and upon his release from the hospital in August 1983 he found that a mechanic's lien had been placed on his property by Dean Company. He also found what he believed to be leaks into the ceiling of a bedroom but made no complaint to Dean Company. Kent then hired a roofer, Chuck Goldsmith, to inspect the work done on his roof. When Goldsmith tried to negotiate the dispute between Kent and Dean Company, Kent fired him. Kent then hired William A. Cox, an architect and roofing consultant, to inspect the roof and advise what needed to be done. Cox inspected the roof in late October 1983 and submitted a list of discrepancies he recommended for correction. In one place he was able to insert a knife blade between the Fla. roof and the vertical wall against which the roof abuts which indicated no sheathing had been installed. Expert witnesses opined that without metal sheathing the roof would have leaked within six to eighteen months and the roof could never have been intact for the 30 years the house had been built without sheathing at such a joint. The vertical side of the original flashing would have been under the stucco at this point and there was no evidence that the stucco was disturbed when the new roof was first installed by Dean Company. New flashing was subsequently installed by Dean Company at this juncture but no one testified respecting the flashing observed or not present when this new roof was removed to insert the new flashing. Failure to insert flashing at such a juncture of horizontal roof and vertical wall would constitute a violation of the Standard Building Code. The report Cox gave to Kent was not made known to Dean until January 1984. By letter dated August 21, 1984 (Exhibit 13) Clark and Logan advised K. A. Williams that they would do all of the work listed in the Cox report on the Kent residence. This work was done in August 1984. Kent contends the leak continued in his bedroom after the work was completed but he never relayed this information to either Clark and Logan or to Dean Company. He has yet to pay one penny for the work done on his roof. Kent considered Clark and Logan to be the prime contractor on the job at the time the August 1984 work was done. Kent further testified that following that work Clark and Logan abandoned the job and he also filed a complaint against that general contractor. Since April 1983 following the damage to the tectum decking, Respondent, Bruce Williams, has had no responsibility for, and did no supervision of, the reroofing of Kent's residence. When the roof was inspected by the Pinellas County Building Inspector he found the workmanship done on this job only slightly below standard. At one place-on the roof Cox found the lower section of flashing overlapped the upper section of flashing which would have permitted water to enter under the flashing. This was a mistake but not an uncommon one for roofers to make. When pointed out to Dean Company the situation was promptly corrected.
The Issue Whether disciplinary action should be taken against the Respondent's contractor license number CG C022926, issued by the State of Florida, based upon the violations of Section 489.105(4), 489.113(3), 489.117(2), 489.115(1)(b), 489.119, and 489.129(1)(d), (e), (g), (j) and (m), Florida Statutes (1987), alleged in three administrative complaints filed by the Petitioner.
Findings Of Fact At all times material to this proceeding, the Respondent, Richard Lee Melvin, was a licensed contractor in the State of Florida, having been issued license number CG C022926, by the State of Florida. The Armstrong Job On or about February 26, 1987, Mr. and Mrs. Armstrong entered into a contract with Sunshine State Homes to do certain siding work and roofing work on two mobile homes owned by the Armstrongs located at 4605 and 4607 Orange Drive in Holiday, Florida. The cost of the repairs under the contract was $6,400. Although the Respondent did not sign that contract, his name and license number appeared on it, he applied for and was granted the necessary Pasco County permit for Sunshine State Homes using his licensure. At the time he applied for the permit, the Respondent knew that Sunshine State Homes was not licensed since he was considering qualifying that company. The permit that the Respondent received from Pasco County required, among other things, that all the Respondent's work conform with the requirements of state and county codes and regulations. The Respondent acted in the capacity of a contractor for Sunshine State Homes even though his certificate did not contain the name Sunshine State Homes. After the signing of the contract, work began on both structures. The roof was replaced on the main structure, and the Armstrongs were informed that the Rainbow Roof System contracted for could not be installed. After work began, it rained and because of improper construction techniques, both mobile homes flooded. Representatives of Sunshine State Homes attempted to correct the problems, but when it rained again, there was substantial leaking in both mobile homes. A rug from the main mobile home had to be removed. Another attempt was made to correct the leaks at the rental unit by re-coating the roof with sealant. Again, it rained, and both mobile homes flooded. Both mobile homes had leaks where, prior to construction beginning, they did not have leaks. Insurance covered $1,200 of the damage to the main mobile home. There also was damage that was not covered by insurance. The type of roof put on the main coach resulted in leaks all along the seam between the roof over the main coach and the roof over the addition to the main structure. The water leaked through the walls of the mobile home, causing water damage. On or about April 7, 1987, the roofs supposedly were finished, and the contractor wanted the rest of his money. The Armstrongs refused to give the balance of the money until another heavy rain was experienced. After representatives from Sunshine State Homes made various threats, the owners paid Sunshine State all but $900 of the contract price. The $900 was withheld to cover the water damage sustained as a result of the leaks. The work that was done was required to be inspected by Pasco County. The work had not been inspected because neither the Respondent nor anyone else from Sunshine State had called for inspections. The work that was done deteriorated over the summer months. On October 14, 1987, the homeowners contracted with Holiday Aluminum to replace the two mobile home roofs in accordance with the contract previously entered into between the homeowners and Sunshine State Homes. It cost the homeowners $4,300 to have the two new roofs installed. They have not experienced any problems with the roofs installed by Holiday Aluminum. The work Sunshine State did under the Respondent's licensure was done in a grossly negligent or incompetent manner. The Respondent and Tropical Exteriors The Respondent was contacted by Jeff Gaston, in mid-November, 1986. Gaston wanted the Respondent to qualify Gaston's company, Tropical Exteriors and Services, Inc. The Respondent met with Gaston and Gaston's attorney, and the Respondent understood that it would take time for all of the paperwork to be concluded. Towards the end of March, 1987, the Respondent started having concerns about his business relationship with Gaston and Tropical. However, the Respondent took no action to terminate that relationship or otherwise advise any governmental agencies involved or homeowners that he was not associated with Tropical until May 13, 1987. There was a continuous business relationship between the Respondent and Tropical for the period November, 1986, through May 13, 1987. The Respondent never qualified Tropical. The Respondent knew that Tropical was using his name in connection with its business after November, 1986. He also thought he would be given notice of any contracts Tropical entered into. But Tropical entered into contracts with the Clems and the Warzyboks and began work without telling the Respondent. The homeowners relied on Tropical's representations regarding the Respondent's association with the business. The Clem Job In November, 1986, Mr. and Mrs. Clem knew that they needed a new roof on their residence located 10511 - 53rd Avenue North, St. Petersburg, Florida, because the shingles were curling. However, they did not have any leaks in the roof. In November, 1986, the Clems were contacted by Millie Morris regarding the roof repairs. Morris stated that she worked for Tropical and was representing U.S. Steel. She advised the Clems that she would like to use the Clem home in an advertising campaign. The Clems did not have the cash money to pay for the repairs and needed financing. As part of that financing, Morris stated that she would give the Clems a $300 rebate on contracting resulting from any leads the Clems gave her. The Clems were able to obtain a second mortgage on their home which provided for the financing of the needed improvements. On or about February 9, 1987, the Clems entered into a contract with Tropical. At the time of the signing of the contract, Morris again reaffirmed to the Clems that any leads the Clems gave Morris that resulted in a contract would result in the Clems being paid the sum of $300. The Clems put $1,000 down at the time of signing the contract and were to pay $1,500 during the course of the job and $2,500 on completion of the job. Before entering into the contract, the Clems relied on the information on the contract letterhead which contained the Respondent's name, type of state certificate, license number, number of years of experience and a representation that the Respondent was insured. Additionally, the Clems called the Better Business Bureau and checked on Tropical to see if any complaints had been filed. The contract provided for, among other things, the removal of the old roof, installation of a new roof, the installation of soffit and facia, the installation of doors and windows and a guaranty on all the work. Shortly after the contract was signed and work was started on the roof, the Clems told Morris the people across the street from them needed repairs. Those people signed a contract with Tropical to have their roof replaced. The work was done, but the Clems received nothing for giving Tropical the customer lead. After the work was done, the Clems dealt with Morris and Gaston. Several times after the job was started, the Clems tried to get Gaston on the job site because the roof was leaking, there was no flashing around the drain pipes and vents, the aluminum edging was bent in many places and the siding had fallen on the ground. Several times when a representative of Tropical was on the job site, Mrs. Clem pointed out to them that the aluminum was bent in places, the seams were cut crooked, there were unnecessary splices in the aluminum, there were bad cuts around certain pipes, there was an electric light left hanging, the wrong weather stripping had been installed around the door, other weather stripping was not put up right, the windows were not sealed, the roof leaked, there was unnecessary tar on the shingles and there were aluminum overlaps facing the street, among other things. From that point forward, representatives of Tropical assured the Clems on many occasions that those problems would be corrected by a date certain, but the deadline was missed in every base. During the construction, the Clems agreed to pay Tropical the $1,500 due during the construction and $2,000 of the $2,500 that was due at the end of construction because a representative of Tropical explained to them that the job was near completion, Tropical needed the money to cover expenses and that Tropical would put in a bedroom window in the Clems residence at no charge. After many telephone conversations and on-site inspections by Tropical, all to no avail, Tropical agreed to finish the job if the Clems would pay him the remaining $500 and if the Clems would pay him an additional $150 for the bedroom window Otherwise, Tropical threatened to forfeit the $500 and not complete the job. The Clems agreed because they knew that it would cost them more than $500 to have the job completed by someone else. The job still was not competed, and the complaints were not corrected. The Clems called another siding contractor, who told the Clems that he would charge $750 just to correct the siding problems, that no permits had been pulled for the job and that the Clems should not allow any further work to be done until the permits had been pulled for the siding and the roof. When the building department received the siding contractor's inquiry regarding the permits, it contacted Tropical. The Clems had several conversations with their attorney, who advised the Clems that it would be cheaper to attempt to solve the problem with Tropical than to get a new contractor. Several attempts were made to have Tropical complete the job, but Tropical continuously failed to honor its agreements. The last time anyone from Tropical was on the job site was April 17, 1987. As of the hearing date, the complaints had not been corrected, and the work had not been completed in accordance with the contract. On or about March 13, 1987, the Respondent obtained a building permit from Pinellas County, Florida, for the installation of the aluminum soffit and facia work, only. Later, after the Respondent had terminated his relationship with Tropical, the job was inspected by the Department of Building Inspections of Pinellas County and was cited for violations of the applicable local codes which never were corrected. The work that was done was done in a grossly negligent or incompetent manner. The Warzybok Case On or about January 14, 1987, Mr. and Mrs. Warzybok, entered into a contract with Tropical Exteriors and Services, Inc., for the removal and replacement of the Warzyboks flat roof at their residence located at 6088 - 27th Avenue, St. Petersburg, Florida. Before entering into the contract, the Warzyboks relied on the information on the contract letterhead which contained the Respondent's name, type of state certificate, license number, number of years of experience and the representation that the Respondent was insured. Additionally, the Warzyboks called the Better Business Bureau and checked on Tropical Exteriors and Services, Inc., to see if any complaints had been filed. Before entering into the contract, the Warzyboks' old flat roof was leaking on the outside of an exterior wall but was not leaking inside. Shortly after the contract was signed, Tropical tore off the old roof, mopped one coat of tar over it, and after it started to rain, put some visqueen over the roof and left. Sometime during the following week, representatives of Tropical finished mopping, put some roof paper down and did some other miscellaneous work. Approximately one week later, Warzybok had the tile roof over the main house pressure cleaned (this roof was connected to the flat roof). When the water from the pressure cleaning came off the tile roof onto the flat roof, the water flooded the room underneath the flat roof. The Warzyboks also discovered that there were broken tiles on the roof over the main house. The flat roof was now leaking inside as well as outside. The Warzyboks attempted on numerous occasions to contact Tropical and have Tropical correct the problems and finish the work. Numerous appointments were made to finish the work and correct the problems, most of which were not kept. Whatever work was done by Tropical did not complete the job or correct the problems. At one point, Tropical sent out a new roofer, Bill Vance, who told the Warzyboks that the roof needed to be totally redone. Several months after the job was started, the homeowners called the City to get an inspection and determined that no permit had been obtained for the job. The City of St. Petersburg Building Department went to the Warzybok property and determined that there had been no permit issued and that the persons who were working on the premises were not licensed roofers. The building department placed a stop order on the work and told the Warzyboks that they needed a licensed roofer to complete the job. The job still has not been completed, and the problems have not been corrected. As of the hearing date, the Warzyboks have problem with leaking skylights, skylights covered with tar, a leaking fireplace, plaster being separated from the sheetrock because of water damage, roofing tiles that were not replaced after they were broken by Tropical and tar on the bottom of the roof, among other things. The Warzyboks got an estimate of $275 just to replace one piece of plaster adjacent to the fireplace only. Tropical started the roof as a three-ply roof and then changed the roof to a one-ply roof. There has been leaking at the chimney and at the skylights, which were not properly installed Some of the tile removed from the main roof at the point of tie-in with the flat roof has not been replaced properly and, in some places, has not been replaced at all. The Respondent, under whose license the work was done, did not know of, and did not properly supervise, the installation of the roof. The roof was installed in an incompetent manner.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Construction Industry Licensing Board find the Respondent guilty of violating Section 489.105(4), 489.119, and 489.129(1)(d), (e), (g), (j) and (m) , Florida Statutes, and that, as punishment, impose on the Respondent a fine of $5000, suspend the Respondent's license for three years and place the Respondent on probation for one year after termination of the suspension conditioned on completion of continuing education designated by the Board and on such other terms that the Board deems appropriate. DONE and ENTERED this 20th day of April, 1989 in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of April, 1989. APPENDIX TO RECOMMENDED ORDER CASE NOS. 88-5197, 88-5198 and 88-5199 To comply with Section 120.59(2), Florida Statutes (1987), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. 1.-4. Accepted and incorporated. Sixth sentence, rejected because it was additional sealant, not fiberglass, that was put on the rental unit. Otherwise, accepted and incorporated. Accepted and incorporated. Proposed findings regarding the "high ridge" rejected as not supported by the evidence but otherwise accepted and incorporated. Rejected that the owners held back $1,400 (they held back $900) but otherwise accepted and incorporated. Proposed findings regarding the owners' telephone calls to the inspection department and the inspection results rejected as not supported by the evidence. First and penultimate sentences, accepted and incorporated. 10.-11. Accepted and incorporated. 12. Subordinate and unnecessary. 13.-28. Accepted and incorporated. 29. Accepted but subordinate and unnecessary. 30.-33. Accepted and incorporated. 34. Proposed findings that the permit was pulled after the work for purposes of correcting the work rejected as not proven by the evidence. Otherwise, accepted and incorporated. 35.-45. Accepted and incorporated. The estimate was for plaster, not "plastic." Otherwise, accepted and incorporated. Accepted and incorporated. Second sentence, rejected as not supported by the evidence. Otherwise, accepted and incorporated. Accepted and incorporated. Respondent's Proposed Findings of Fact. (These rulings relate to the unnumbered paragraphs in the Respondent's March 23, 1989, letter, starting with the third paragraph. They are assigned consecutive paragraph numbers for purposes of these rulings.) Accepted and incorporated. First sentence, accepted and incorporated; second sentence, rejected as contrary to facts found. Accepted but subordinate to facts found and unnecessary. First and last sentences, accepted and incorporated. Second and third sentences, rejected as contrary to facts found. First sentence, accepted and incorporated. Second sentence, rejected as unclear. Accepted. First sentence, incorporated; second sentence unnecessary. First and third sentences, rejected as contrary to the weight of the evidence; second sentence, accepted but unnecessary. First sentence, accepted and incorporated (although the unlicensed companies using the Respondent's name also did work and assumed responsibility for the jobs over which the Respondent exercised no control at all.) Second sentence, rejected as contrary to facts found. COPIES FURNISHED: Jack M. Larkin, Esquire 806 Jackson Street Tampa, Florida 33602 Richard Lee Melvin 12737 North Florida Avenue Tampa, Florida 33612 Fred Seely, Executive Director Florida Construction Industry Licensing Board 111 East Coastline Drive, Suite 504 Jacksonville, Florida 32202 Kenneth E. Easley, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750
The Issue Whether Respondent committed the offenses alleged in the Administrative Complaint and, if so, the penalties that should be imposed.
Findings Of Fact At all times relevant to this proceeding, Respondent has been licensed by the Petitioner as a roofing contractor, having been issued license number CCC 57995 by the Florida Construction Industry Licensing Board. At all times relevant to this proceeding, Respondent was the qualifier for and did business as “Victor’s Roofing Co., Inc. of the Fla. Keys” (Victor’s Roofing). At all times relevant to this proceeding, Mr. Johnson was an owner of property located at 3214 Harriet Avenue, Key West, Florida (the subject property). Mr. Johnson lives in Hollywood, Florida. The subject property is rental property. Respondent and his company are not licensed to do drywall work in Key West, Florida, and they are not licensed with Petitioner other than as a roofing contractor. ROOFING WORK On November 3, 2008, Respondent, on behalf of Victor’s Roofing, entered into a contract with Mr. Johnson to re-roof the subject property. The proposal submitted by Respondent to Mr. Johnson contained Victor’s Roofing’s full corporate name; its office address in Marathon, Florida; two telephone numbers; and a fax number. The proposal was signed by Respondent. The proposal described in some detail the scope of the work. The price of the work was $7,000.00. Mr. Johnson accepted the proposal. Victor’s Roofing completed the roofing job to Mr. Johnson’s satisfaction. A leak developed after the roof was completed and Victor’s Roofing promptly repaired the leak to Mr. Johnson’s satisfaction. Petitioner’s Administrative Complaint alleged that Victor’s Roofing had failed to obtain a permit for the roofing job on the subject property and that it had failed to obtain required inspections. Those allegations were the result of an error by Petitioner’s investigator. Ms. Del Rio obtained records from the City of Key West Building Department for the wrong address. Instead of obtaining the permit history for the subject property (3214 Harriet Avenue) she requested and obtained the permit history for 3314 Harriet Avenue. Respondent applied for a permit for the roofing job on the subject property on November 11, 2006, and he obtained an inspection of the roof on November 27, 2007 [sic]. There was insufficient evidence to establish that any other permit or any other inspection was required for the roofing work. DRYWALL WORK After the roofing job had been completed (but before the inspection on November 27, 2007),2 Mr. Johnson informed Respondent by telephone that he needed someone to replace drywall that had been damaged during the period of time the subject property’s roof leaked. Mr. Johnson asked Respondent whether he knew anyone who could do the job. Respondent replied in the affirmative and told Mr. Johnson he would have someone contact him about doing the work.3 Thereafter, Respondent’s brother, Early Harris, contacted Mr. Johnson and the two of them verbally agreed on a price of $4,000. At the time Respondent put Early Harris in touch with Mr. Johnson, Respondent knew that Early Harris was not licensed to do drywall work in Key West. After giving Mr. Johnson’s telephone number to Early Harris, Respondent had no further involvement with the drywall work on the subject property. The price of the drywall work escalated to $9,000.00 after the work began. On November 25, 2006, Early Harris and Mr. Johnson signed a written proposal agreeing to the price of $9,000.00.4 This was a form proposal with the following: Victor’s Roofing Co., Inc. 2nd Generation Serving South Florida Licensed & Insured Marathon, Fla. The only telephone number on the proposal other than Mr. Johnson’s, was the number for Early Harris’ cell phone. The contract signed by Respondent on November 3, 2006, for the roofing work was on a different form and utilized a different font than the contract signed by Early Harris on November 25, 2006. The name of the corporation on the proposal for the drywall work, while similar to the name of Respondent’s company, was different. Early Harris has worked for Respondent’s business for several years, but there was no clear and convincing evidence that Early Harris had the authority to contract on behalf of Respondent’s business in November 2006. There was no evidence that Early Harris is a part owner of Respondent’s business or that he is an officer or director of Respondent’s business. Respondent testified, credibly, that Early Harris was not authorized to contract on behalf of Respondent’s business at the times relevant to this proceeding. There was no clear and convincing evidence to refute Respondent’s assertion that Earl Harris had no authority to contract on behalf of Respondent’s business. Early Harris did the drywall work on the subject property. Mr. Johnson paid Early Harris $9,000.00 for the drywall work. Mr. Johnson could not find the check(s) he wrote for the drywall work and, consequently the check(s) were unavailable as an exhibit. His recollection as to the name of the payee of the check(s) was not clear. Respondent testified, credibly, that neither he nor his business received any of the money for the drywall work. The drywall work Early Harris did was not to Mr. Johnson’s satisfaction. Mr. Johnson had to pay $600.00 to a drywall contractor for corrective work. In addition, Mr. Johnson had to pay $600.00 for a permit to have the repair work done.5 The total investigative costs of this case to Petitioner, excluding costs associated with any attorney’s time, was $191.16.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Business and Professional Regulation, Construction Industry Licensing Board, enter a final order finding Respondent not guilty of the violations alleged in Counts I, II, and III of the Administrative Complaint. DONE AND ENTERED this 14th day of January, 2010, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of January, 2010.
Recommendation Based upon the foregoing findings of fact and conclusions of law, it is recommended that the Construction Industry Licensing Board issue a written reprimand to respondent Elias Davis for failure to pull a permit on a roofing job. RECOMMENDED this 5th day of April, 1984, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of April, 1984.
The Issue Whether Respondent's contractor license should be disciplined for alleged violations of Chapters 489 and 455, Florida Statutes.
Findings Of Fact Respondent, James Cooper, was at all times material to this action licensed by the State of Florida as a registered roofing contractor, having been issued license number RC0066905. Mr. Cooper's license is currently classified "Inactive, Issued (09/05/97)." Around March 1, 1996, Marshall Moran was contacted by Julia Jones regarding repairs to the leaky roof on her home located at 209 Cresent Drive, DeFuniak Springs Walton County, Florida. Ms. Jones' home was over one hundred years old with a steep metal roof. The roof she wished repaired was over the enclosed sleeping porch of her house. Over the last ten years, she had various contractors attempt to fix the leak in the sleeping porch roof. These attempts occurred, on average, more than one time per year. The leak always returned. Marshall Moran is an unlicensed and unregistered roofing contractor. Mr. Moran has been a roofing contractor since before the licensure requirements for contractors became law. He elected not to become licensed under those statutes. However, he did have the experience and skills necessary to repair Ms. Jones' roof. Marshall Moran discussed the job with Ms. Jones. Mr. Moran recommended the entire section of the roof be rebuilt and described the anticipated repairs. Ms. Jones would not allow the entire section of roof to be repaired. She thought only the small section where the leak was apparent needed repair. Unknown to Ms. Jones and prior to beginning the work, Mr. Moran contacted Respondent to tell him of Ms. Jones' job and to see if Respondent wanted to do the job. Respondent couldn't do the job with his crew but offered to allow Mr. Moran to "work under his license." Respondent was pursuing a large commercial roofing contract around the same time as the events at issue here. He wanted to keep Moran's crew together in order to be able to complete the large commercial job. He held the crew together by enabling Moran to do the construction at Julia Jones' residence in consideration for taking legal responsibility for the Jones' job. Respondent did not hire Mr. Moran as his employee. Respondent knew Mr. Moran was not registered or certified to practice contracting. He also knew Mr. Moran was well qualified to perform the work on the Jones' job. Respondent admits that he knew that he should not pull permits for anyone, but that he did it just this one time in order to keep the crew together. On March 15, 1996, Respondent obtained City of DeFuniak Springs, Florida, building permit number 1379 for the roof repairs to Ms. Jones' residence. On the application for said building permit, Respondent represented himself (doing business as Cooper Roofing and Repair) as the contractor of record on the aforesaid project. Respondent intended to and did eventually take legal responsibility for the Jones' job. However, he did not supervise Mr. Moran or his crew. Additionally, Ms. Jones was never informed of Respondent's involvement. More importantly, Ms. Jones never contracted with Respondent for either Respondent or his company to perform roof repairs on her home. On March 21, 1996, Mr. Moran provided an estimate for repair of the portion of Ms. Jones' roof she felt needed repair. The estimate bears the name of "AAA Metal Works" and "Marshall Moran." AAA Metal Works was Mr. Moran's company. The estimate does not reference either Respondent or his company. The estimated cost to repair Ms. Jones roof was $2,785. Based on the estimate, Ms. Jones entered into a contract with Mr. Moran and AAA Metal Works to perform the repairs to her roof discussed above. Moran and his crew substantially completed the repairs to Ms. Jones' roof in a few days. However, the roof continued to leak after Moran and his crew ended their work. The continuing leak was not due to any incompetence on the part of Respondent or Moran. Ms. Jones paid for the repairs with two checks made out to AAA Metal Works. The checks were in the amounts of $3,500 and $4,350. Respondent did not receive any of the money for the Jones' job. His only expense was the fee for the building permit. All other expenses were paid for by Mr. Moran. At no time during the formation or performance of the contract with Marshall Moran did Julia Jones have any contact with or knowledge of involvement by Respondent. In fact, Respondent only drove by the job site one time. As indicated, the roof continued to leak. Ms. Jones contacted Mr. Moran on approximately 5-6 occasions notifying him of the continued leaks. Mr. Moran would return to Ms. Jones' home and inspect the problems, but was unable to stop the leaks to Jones' satisfaction. It is not clear whether Mr. Moran kept Respondent informed of these continued service calls. Approximately one year after completion of the initial repairs on Ms. Jones' roof, Respondent received a call from Ms. Jones' tenant and friend, Sharon Jenks, who called posing as a potential new client. Ms. Jenks had gotten Respondent's name from the building permit. Ms. Jenks called Respondent because the house was still leaking approximately one year after the repair was done and intervening visits by Marshall Moran had not fixed the problem. Ms. Jenks arranged for Respondent to visit Ms. Jones' home. Respondent did not recognize the house when he arrived and drove past it. When Ms. Jenks showed Respondent the building permit bearing his name, Respondent showed surprise. He returned the next day with Mr. Moran. Respondent, Mr. Moran, Ms. Jenks and Ms. Jones all met regarding the continued leaking. Respondent and Mr. Moran told Ms. Jones that the metal on the roof was "bad" and needed to be replaced to stop the leaks on the "sleeping porch." Understandably, Ms. Jones did not want to deal any further with Mr. Moran or Respondent and would not permit them to make the recommended necessary repairs. Ms. Jones sued both Respondent and Mr. Moran in a civil action styled: Julia R. Jones v. James K. Cooper and Marshall Moran, Case Number 97-0040-CC, in the County Court of the First Judicial Circuit in and for Walton County, Florida. Following a judge trial, a Final Judgment was entered in favor of Respondent and Mr. Moran on December 9, 1997. Mr. Moran was charged with contracting without a license in violation of Section 489.127, Florida Statutes (1995), in State of Florida v. Marshall Moran, Case Number 97-0549-CF, in the Circuit Court of the First Judicial Circuit in and for Walton County, Florida. That charge was dismissed by Circuit Judge Lewis Lindsey on February 3, 1998.
Recommendation Based upon the findings of fact and conclusions of law, it is, RECOMMENDED: That the Board should find Respondent guilty of violating Chapters 489 and 455, Florida Statutes, and impose an administrative fine of $500.00 on Respondent DONE AND ENTERED this 3rd day of August, 1998, in Tallahassee, Leon County, Florida. DIANE CLEAVINGER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of August, 1998. COPIES FURNISHED: John O. Williams, Esquire Maureen L. Holz, Esquire Willams and Holz, P.A. 458 West Tennessee Street Tallahassee, Florida 32301 J. LaDon Dewrell, Esquire 207 Florida Place, Southeast Ft. Walton Beach, Florida 32549 Rodney Hurst, Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792
The Issue Whether Respondent committed the offenses set forth in the administrative complaint and, if so, the penalty which should be imposed.
Findings Of Fact At all times material to this case, the Respondent, Harry Bradshaw, was licensed as a registered roofing contractor in the State of Florida, holding license number RC 0033812. On August 26, 1986, Respondent's license as a registered roofing contractor was suspended by Petitioner. Respondent's license remained suspended at all times material to this case. On December 16, 1987, Respondent contracted with the Moose Lodge located in Hialeah, Florida, to reroof the Moose Lodge building. The proposal submitted by Respondent contained representations that Respondent was licensed as a registered roofing contractor and that he was insured. Respondent knew that his license as a registered roofing contractor was under suspension. Respondent had no insurance. The contract between Respondent and the Moose Lodge provided that Respondent would perform the work and supply the materials for the sum of $6,200.00. The sum of $3,200.00 was paid to Respondent in advance of his beginning the job. Respondent used the sums advanced to purchase materials and supplies. The remaining $3,000.00 was to have been paid upon Respondent's completion of the job. During the negotiations that resulted in the contract between Respondent and the Moose Lodge, Respondent represented that the job should be completed in time for the functions scheduled for New Year's Eve. While Respondent had purchased the materials needed for the job and had done a substantial amount of work on a portion of the roof, he was unable to complete the work by the New Year. Respondent was ordered to stop work on the job on January 26, 1988. Respondent did not abandon the job. Although he was slow in performing the work, a part of Respondent's delay in performance was caused by rain. There was no evidence as to what would have been a reasonable period of time for Respondent to have completed the job. On January 26, 1988, the administrator for the Moose Lodge complained to the Building Inspection Department for the City of Hialeah, Florida, because the administrator was not pleased with the progress that Respondent was making toward completion of the job. The administrator was told by a representative of the Building Inspection Department on January 26, 1988, that Respondent had no license and that the required permit had not been pulled. The administrator was told to prohibit Respondent from working on the roof. Immediately thereafter, the administrator instructed Respondent to do no further work on the roof. The members of the Noose Lodge completed the job started by Respondent for less than $3,000.00, the balance of the amount that would have been owed Respondent if he had finished the job. Respondent knew that a permit was required for this work. Respondent also knew that only a licensed roofing contractor could pull the required permit. Respondent proceeded with the job when he was unable to persuade a licensed roofing contractor to pull the permit for him. Petitioner filed an administrative complaint against Respondent alleging that at the time he contracted with the Moose Lodge, Respondent's license was suspended, thus violating the provisions of Section 489.129(1)(j), Florida Statutes, and the provisions of Section 489.127(1)(e), Florida Statutes. The administrative complaint also alleged that Respondent failed to perform in a reasonably timely manner and/or abandoned the job in violation of Section 489.129(1)(m), Florida Statutes, and Section 489.129(1)(k), Florida Statutes. Respondent denied the allegations of the administrative complaint and timely requested a formal hearing. This proceeding followed. Respondent was previously disciplined by the Construction Industry Licensing Board, and his license remained under suspension at the time of the final hearing.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered finding Respondent guilty of having violated Section 489.127(1)(e), Florida Statutes, and Section 489.129(1)(j), Florida Statutes. It is further recommended that the final order revoke Harry Bradshaw's license in the State of Florida as a registered roofing contractor. DONE and ENTERED this 31st day of October, 1989, in Tallahassee, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of October, 1989. COPIES FURNISHED: Harry Bradshaw 5590 East Seventh Avenue Hialeah, Florida 33013 David M. Gaspari, Esquire Adams, Coogler, Watson & Merkel, P.A Suite 1600 NCNB Tower 1555 Palm Beach Lakes Boulevard West Palm Beach, Florida 33402-2069 Kenneth E. Easley, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201
The Issue The issues in this case are whether the Respondent, Brian D. Legate, should be disciplined on the charges in the Administrative Complaint, PCCLB Complaint No. C98-556. Specifically, the Administrative Complaint charged violations of Section 24(2)(d), (j), (m), and (n) of Chapter 75-489, Laws of Florida (1975), as amended, by: Count I - failure to obtain a building permit before beginning roofing work, contrary to the requirements of Section 104 of the Standard Building Code; Count II - covering rotted roof framing and building a roof that leaked, contrary to the requirements of Section 1509.1.2.1 of the Standard Building Code; and Count III - committing gross negligence, incompetence, or misconduct in the practice of contracting.
Findings Of Fact The Respondent, Brian D. Legate, is a licensed roofing contractor. He holds license C-4676 (RC0061241). On approximately March 16, 1998, Mr. and Mrs. Richard Shutt requested an estimate from Legate for the repair of a leaking roof at their house at 7127 Third Avenue South, St. Petersburg, Florida. The leaking portion of the roof was a flat, built-up roof that was over the single-story living room of the house and adjacent to a second story bedroom; the other three sides of the perimeter of the leaking roof consisted of capped parapet walls. The roof and tile covered the flat portion of the roof and extended approximately ten inches up the inside of the parapet walls. The Shutts did not testify. Legate testified that the Shutts could not afford to completely rebuild and seal the parapets, re-roof, and re-tile. Instead, the Shutts wanted Legate to tear off the old roof down to the wood decking and re- roof to try to stop the roof leak; the Shutts planned to have someone else rebuild and seal the parapets and finish the roof with new tiles in about six months. Legate recognized that the Shutts' plan was not ideal; it would be difficult to maintain a watertight roof system until the parapets were rebuilt and sealed and the tiles replaced. Under the Shutts' plan, Legate would have to tack the new roof to the lower part of the parapet walls as best he could and tuck the upper edge of the new roof under the drip edge on the parapet wall to secure it temporarily until the parapet walls were rebuilt and sealed and the new tile installed. But Legate agreed to cooperate with the Shutts and give them an estimate for the work requested. Legate also recognized that it would have been best to install new flashing between the new roof and the parapet walls above the roof. The old metalwork serving as flashing on the existing roof system actually was a metal roof drip edge that was being misused as flashing. Legate recommended new flashing, but the Shutts declined because it would cost an additional $1,500 that they could not afford. On or about March 16, 1998, Legate gave the Shutts an estimate, without any new metalwork, for $4,000, plus $950 for new roof drains. Legate planned to install the roof drain bowls somewhat higher than the top of the new roof so that they would be flush with the ceramic tile when eventually installed over his roof. The Shutts accepted Legate's estimate for the roof work, a contract was signed, and the Shutts paid an inital $1,200 installment on March 19, 1998. Legate began work on the Shutts' roof approximately two weeks later. Legate also has a general contractor license, and he also made a proposal to repair wood and plaster inside the Shutts' house that had been damaged over the years by water leaking from the roof above. The Shutts could not afford this proposal and declined. Legate purposely delayed obtaining a building permit to give the Shutts more time to have the parapet walls rebuilt and the new tile installed under the six-month life of the building permit. As Legate's work proceeding, the Shutts paid an additional $1,200 on April 9, 1998, and another $2,000 on May 4, 1998. At approximately the time Legate invoiced the Shutts for the balance due under their contract, a dispute arose regarding the appearance of the roof drain bowls Legate installed. Legate agreed to remove the offending drain bowl, and order and install a type more to the Shutts' liking. On or about June 2, 1998, Legate applied for a building permit. He also requested that they file the notice of commencement so that he could call for a building inspection. At some point (the evidence is not clear when), Legate also wrote the Shutts by certified mail and enclosed a completed notice of commencement for them to sign and file. By letter dated June 5, 1998, an attorney representing the Shutts demanded that Legate not contact the Shutts again and not do any further work on their property because the work done was "inferior and was not of the type desired." Legate complied with the attorney's demand. He did not know exactly what the problem was but assumed it had something to do with the drain bowls. The Shutts did not file a notice of commencement until approximately June 24, 1998. On or about July 6, 1998, someone other than Legate (the evidence was not clear who, but probably the Shutts or their attorney) called for a building inspection of Legate's work. Legate did not know either that the notice of commencement had been filed or that someone had called for an inspection. For that reason, and also because he had been ordered off the job, Legate was not there on July 7, 1998, when a building inspector from the City of St. Petersburg inspected the roof. The Shutts invited the inspector inside the house where he inspected interior water damage and was able to inspect water- damaged wood laths (used to secure ceiling plaster), roof joists and framing beneath one of the roof drains from the underside. The inspector found the roof to be leaking and covering rotted roof framing. He was concerned that it might be dangerous to attempt to place the additional weight of ceramic tile over the roof, especially for the intended use as additional living space (an outdoor, second-story patio.) The inspector determined that it would be necessary to have an on-site inspection with the contractor and a copy of the roofing manufacturer's specifications for the type of roof system applied before final inspection. The building inspector did not contact Legate directly to inform him of the need for an on-site inspection; instead, he left a notice on the building permit at the premises. The inspector was unaware that Legate had been ordered off the premises and would not see the notice. Legate was not aware that an inspection had taken place and did not contact the building inspector. Not having heard from Legate, the building inspector returned to the premises on July 13, 1998, for final inspection without Legate. He saw essentially the same conditions as before and disapproved the work. Legate also was unaware of this second inspection. He never inquired with the City building department as to whether a notice of commencement had been filed or whether the roof had been inspected. On September 15, 1998, the Shutts had the roof inspected by an independent roofing consultant. The independent inspection confirmed the building inspector's findings and added that damage caused by the roof leaks in the meantime had caused additional damage to the roof itself, as well as to the roof substrate (decking) and framing, to the point that it could have been dangerous to attempt to place the additional weight of ceramic tile over the roof, especially for the intended use as an outdoor, second-story patio. The independent roof consultant testified that water was leaking where the metal drip edge had pulled away from the parapets, and there was a gap between the top of the roof material and parapets. He also testified that the drip edges were old and an improper choice for use as flashing where the roof material met the parapets. However, he could not testify as to when the drip edge pulled away from the parapets and apparently was not aware that, for financial reasons, the Shutts had rejected Legate's recommendation to install new metal flashing. The independent roof consultant testified that water also was leaking at the roof drain bowls because they were set too high, causing improper ponding on the roof in the vicinity of the drain bowls. He also testified that, even if the ceramic tile had been installed promptly after Legate's work, the roof drain bowls still should have been flush to the waterproof roofing material, not to the ceramic tile going in over it. However, Legate and his foreman testified that Legate's plan was acceptable and would have made the finished roof watertight. The evidence was not sufficient to prove Legate incorrect. Legate and his workers replaced some rotted roof decking before replacing the roof. They testified that they did not see any more rotted roof framing or joists. While some additional water damage inside the house was evident on September 15, 1998, including rotted ceiling wood lath and joists, it was not clear from the evidence how much was visible or evident to Legate and his workers from their vantage point working on the roof. It is clear, however, that Legate gave the Shutts an estimate for the repair of interior damage, to the extent visible, and that the Shutts declined the repairs for financial reasons. There was no evidence that the Shutts ever complained to Legate that the new roof was leaking. The last Legate heard from the Shutts was their attorney's letter demanding that he not contact the Shutts and not do any more work on the roof. Legate also was unaware of the building inspections and the independent inspection. Legate testified without contradiction that, if he had been aware of the leaks or had been asked, he certainly would have returned to stop the leaks, at least by temporary means, until the additional work contemplated by the Shutts could be done. Section 104.1.1 of the Standard Building Code (1997) requires a contractor to obtain the required building permit before beginning work. There was testimony that the City of St. Petersburg allows builders to "call in" an application for a building permit (by telephone), begin work, and actually obtain the permit within a day or two. But such a procedure would not allow for a delay of months. Section 1503.1.2.1 of the Standard Building Code (1997) requires that roof coverings "provide weather protection for the building at the roof." (The reference to Section 1509 in the Administrative Complaint apparently was a typographical error.) PCCLB has published "Guidelines for Disciplinary Action," which state that $750 is the "typical" penalty for the first "major" infraction and that $300 is the "typical" penalty for the first "minor" infraction. "Major" and "minor" infractions are not defined. The Guidelines also provide that the PCCLB shall consider aggravating and mitigating factors and may take any of the following actions: (1) suspension for a time certain (with possible permission to complete any uncompleted contracts); (2) revocation; or (3) an administrative fine not to exceed $1,000 per count.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Pinellas County Construction Licensing Board enter a final order finding the Respondent, Brian D. Legate, guilty under Count I, fining him $300 under Count I, and dismissing Counts II and III of the Administrative Complaint. DONE AND ENTERED this 25th day of March, 1999, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of March, 1999. COPIES FURNISHED: Williams Owens, Executive Director Pinellas County Construction Licensing Board 11701 Belcher Road, Suite 102 Largo, Florida 33773-5116 Brian Legate 5901 40th Avenue, North St. Petersburg, Florida 33709
The Issue Whether Respondent should be disciplined for failure to comply with provisions of Florida law?
Findings Of Fact Respondent, George F. Garrard, is licensed as a registered roofing contractor holding State of Florida license number RC 0045805. On May 14, 1986, Respondent entered into a contract with Ronald Skinner to reroof a house located at 2226 Eudine Drive, in Jacksonville, Florida. The contract provided that Respondent would: "Tear off the entire roof to sheeting. Haul off all debris. Install 5 ply-build-up roof. New metal edging." In exchange for the work, the contract called for Respondent to receive $1100.00, $600.00 to be paid in advance for materials and $500.00 to be paid upon completion of the job. 2. Mr. Skinner paid Respondent the $600.00 advance for materials and work on the roof began the following day. While the work on the roof was in progress, Mr. Skinner conducted periodic inspections and noticed that the felt had buckled up. Mr. Skinner asked Respondent how he was going to fix the felt and Respondent said that he could fix the felt by cutting out the buckled parts and patching the felt. Mr. Skinner responded that he had a patched roof before and did not want another; he wanted a new roof. Respondent promised he would fix the problem. Prior to the work being completed, Respondent made a telephone call to Mr. Skinner and asked for payment of the remaining balance on the contract in order to purchase the materials needed to finish the job. Mr. Skinner agreed to meet John T. Garrard (Respondent's son) at the house and pay the balance. Respondent authorized Mr. Skinner to pay John T. Garrard. When Mr. Skinner arrived at the house, John T. Garrard and another person were unloading rocks from a pick-up truck and placing the rocks in a pile on the carport roof. Mr. Skinner paid John T. Garrard $500.00 and John T. Garrard wrote "Paid in Full" on the face of the contract and signed his name. A few minutes after Mr. Skinner left the house, John T. Garrard and the other person also left the house. Two or three days later, Mr. Skinner returned to the house. He noticed that no further work had been done. The rocks which had been unloaded from the pickup truck were still in a pile on top of the carport. Mr. Skinner was afraid the weight of the rocks would damage the carport so he spread the rocks on the roof. There were not enough rocks to cover the whole roof. Also, the rocks were loose because no tar had been spread on the roof to hold the rocks in place. Mr. Skinner contacted Respondent or someone in his household several times, and Respondent assured him he would finish the job. No further work was done on the roof by Respondent. Mr. Skinner last contacted Respondent by letter dated January 26, 1987, wherein he asked that Respondent finish the job since he had been paid in full. On the date of the hearing, the roofing job had not been completed. The rocks were still insufficient to cover the entire roof, no tar had been spread to hold the rocks in place, and the felt was still buckled in various places. Respondent never obtained a building permit for the reroofing job.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a final order finding Respondent guilty of violating Sections 489.129(1)(d) and (k), Florida Statutes, and imposing a fine of $2,000 on Respondent. DONE and ENTERED this 30th day of March, 1988, in Tallahassee, Florida. JOSE A. DIEZ-ARGUELLES Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1988. COPIES FURNISHED: David L. Swanson, Esquire Department of Professional Regulation 120 North Monroe Street Tallahassee, Florida 32399-0750 George F. Garrard 4622 Tabernacle Place, East Jacksonville, Florida 32207 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750