HIALEAH HOSPITAL vs DEPARTMENT OF FINANCIAL SERVICES, DIVISION OF WORKERS' COMPENSATION, 12-002583 (2012)
Division of Administrative Hearings, Florida Filed:Lauderdale Lakes, Florida Aug. 01, 2012 Number: 12-002583 Latest Update: Apr. 09, 2013

The Issue The issue is whether Respondent properly dismissed Petitioner's Petition for Resolution of Workers' Compensation Reimbursement Dispute, pursuant to section 440.13(7), Florida Statutes.

Findings Of Fact At all material times, C. G. was employed by Solo Printing, Inc., which had workers' compensation coverage through Intervenor. On March 2, 2012, C. G. was injured at work as a result of falling onto his knee during a fight with a coworker. C. G. was transported from the worksite by ambulance to Petitioner's hospital, where he was admitted. Later the same day, C. G. underwent emergency surgery to his knee. He was discharged from the hospital on March 8, 2012. On April 2, 2012, Petitioner billed Intervenor for services rendered to C. G. during his hospitalization. On May 11, 2012, Intervenor issued a Notice of Denial. On June 8, 2012, Petitioner filed with Respondent the Petition. On June 14, 2012, Respondent issued the Dismissal. Intervenor's Notice of Denial cites three grounds for denying payment for the bill: section 440.09(3), which prohibits compensation for injuries to an employee "occasioned primarily" by his willfully trying to injure another person; lack of authorization for services; and any other defense that may become available. The Dismissal cites one ground for dismissing the Petition: Petitioner's failure to submit an EOBR with its Petition. The only ground cited in the preceding paragraph that is relevant is the first cited by Intervenor. This ground raises the issue of compensability by disclosing that Intervenor has not conceded that C. G.'s injuries are compensable. Nor has a Judge of Compensation Claims (JCC) ever entered an order determining that C. G.'s injuries are compensable. In fact, G. has never filed a claim for benefits. At the time in question, C. G. had health insurance, but his insurer reportedly denied coverage on the ground that it insured's injuries were covered by workers' compensation. It does not appear that Petitioner has commenced a legal action against C. G. for payment for the services that it rendered to him in March 2012.

Recommendation It is RECOMMENDED that the Department of Financial Services enter a Final Order dismissing the Petition. DONE AND ENTERED this 25th day of February, 2013, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of February, 2013. COPIES FURNISHED: Lorne S. Cabinsky, Esquire Law Offices of Lorne S. Cabinsky, P.A. Suite 1500 101 Northeast 3rd Avenue Fort Lauderdale, Florida 33301 Mari H. McCully, Esquire Department of Financial Services Division of Workers' Compensation 200 East Gaines Street Tallahassee, Florida 32399-4229 James T. Armstrong, Esquire Walton Lantaff Schroeder and Carson, LLP Suite 1575 200 South Orange Avenue Orlando, Florida 32801 Julie Jones, CP, FRP, Agency Clerk Division of Legal Services Division of Financial Services 200 East Gaines Street Tallahassee, Florida 32399-0390

Florida Laws (4) 120.569120.68440.09440.13
# 1
LARRY E. SHIMKUS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD, 03-003544 (2003)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 26, 2003 Number: 03-003544 Latest Update: Sep. 15, 2005

The Issue The issues in each case are whether, pursuant to Sections 489.141 and 489.143, Florida Statutes (2003), a claimant is entitled to payment from the Construction Industries Recovery Fund, and, if so, whether, pursuant to Section 489.143(7), Florida Statutes (2003), Respondent may automatically suspend the residential contractor's license of Petitioner until Petitioner reimburses Respondent for the paid claim.

Findings Of Fact Petitioner is licensed as a certified residential contractor, holding license number CRC 013599. Respondent first issued a residential contractor's license to Petitioner in 1978, and Petitioner has been continually licensed since that time. Petitioner has never been disciplined by Respondent or any local governmental agency. On January 29, 2004, Respondent transmitted to the Division of Administrative Hearings seven files containing administrative complaints alleging disciplinary breaches against Petitioner for many of the transactions covered in the nine subject cases. These seven new cases have not yet been heard, and Respondent has not yet entered any restitution orders against Petitioner. In the past, Petitioner has placed his residential contractor's license with various corporations to qualify them to perform residential construction. In February 1999, Petitioner met with Lori Thomson, president of Thomson Homes, Inc., to discuss placing his license with her residential construction company. Now inactive, Thomson Homes, Inc., had been in the residential construction business since at least 1994, operating out of an office in Palm Beach County, which is also the location of all but one of the residential construction jobs that are the subject of these cases. Since 1994, Thomson Homes, Inc., had used the general contractor's license of Ms. Thomson's husband, Steven Thomson, to qualify to perform residential construction. During the time that his license qualified Thomson Homes, Inc., Mr. Thomson believed that he and his wife owned the corporation equally and that she served as the president and he served as the vice-president. In the summer of 1998, Mr. Thomson filed for divorce from Ms. Thomson. In February 1999, Ms. Thomson fired Mr. Thomson from Thomson Homes, Inc. Shortly thereafter, Mr. Thomson learned that Ms. Thomson had caused all of the stock to be issued to her when the corporation was formed, and that she had assumed all of the officer and director positions. In early March 1999, Mr. Thomson cancelled all of the building permits that he had obtained on behalf of Thomson Homes, Inc., and withdrew his general contractor's license from Ms. Thomson's corporation, effective March 20, 1999. When Mr. Thomson withdrew his license from Thomson Homes, Inc., it was in the process of building or preparing to build about ten homes. At no time during Petitioner's discussions with Ms. Thomson was he aware that Thomson Homes, Inc., was actively involved in construction. Eventually, Ms. Thomson and Petitioner agreed that Petitioner would place his residential contractor's license with Thomson Homes, Inc., and would supervise the corporation's construction activities. In return, Thomson Homes, Inc., would pay Petitioner $500 weekly and 35 percent of the profits. After filing the necessary documentation in April 1999, Petitioner qualified Thomson Homes, Inc. effective April 22 or 26, 1999. Petitioner advised Ms. Thomson that he had other work to do for another month, so he could not start with Thomson Homes, Inc. immediately. Ms. Thomson told him that she had to get financing arranged for several signed contracts and did not have any construction taking place at the time. The record is unclear whether this delay took place after the initial agreement between Petitioner and Ms. Thomson or after Petitioner formally placed his license with Thomson Homes, Inc. However, in either event, from the date that Petitioner formally placed his license with Thomson Homes, Inc., he never had a substantive conversation with Ms. Thomson about any construction activities of Thomson Homes, Inc. Not hearing from Ms. Thomson, Petitioner eventually called her to learn when he would start work. At first, Ms. Thomson took Petitioner's calls and kept explaining that the financing paperwork had been delayed. She promised to call Petitioner when construction was ready to proceed. However, Ms. Thomson never contacted Petitioner, and she later stopped taking or returning Petitioner's calls. In early August 1999, Petitioner called Thomson Homes, Inc., and learned that its telephone had been disconnected. He visited the office of Thomson Homes, Inc., but found it closed and the premises vacated. In fact, Thomson Homes, Inc., discontinued business on or about August 1, 1999. Between the date that Petitioner had qualified Thomson Homes and the point at which Thomson Homes ceased doing business, Thomson Homes, Inc., had entered into construction contracts, taken deposits and draws on construction loans, and performed residential construction--all unknown to Petitioner. Also unknown to Petitioner was the fact that Thomson Homes, Inc., had failed to perform its obligations under many, if not all, of its construction contracts during that period. The record is unclear when Petitioner withdrew his license from Thomson Homes, Inc. Petitioner sent Respondent a letter on August 30, 1999, advising of the withdrawal of his license from Thomson Homes, Inc. Later advised that he needed to file another form to effect the withdrawal, Petitioner did so in March 2000. The difference is not important in these cases. At no time did Petitioner receive any money from Thomson Homes, Inc., or any of the claimants who contracted with Thomson Homes, Inc. At no time did Petitioner enter into any contracts with any of the claimants. Only after Thomson Homes, Inc., had taken the claimants' money and abandoned work or failed to commence work did Petitioner learn that Thomson Homes, Inc., had done construction business under his license. DOAH Case No. 03-3540 involves the claim of Sandra Harvey. Ms. Harvey entered into a construction agreement with Thomson Homes, Inc., on September 9, 1998. Pursuant to the agreement, Ms. Harvey agreed to pay Thomson Homes, Inc., $25,500 for a lot and $115,260 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After pouring the slab, constructing the shell, and completing the rough plumbing, air conditioning, and electrical, Thomson Homes, Inc., stopped work on Ms. Harvey's home in early 1999. Ms. Harvey learned of the problem when Mr. Thomson called her in early 1999 and said that he could not finish the home because Ms. Thomson had taken over the business. This call probably took place no later than late March 1999, when Mr. Thomas withdrew as the qualifier for Thomson Homes, Inc. The record does not reveal the extent of payments from Ms. Harvey or her lender or the extent of completed work at the time that Thomson Homes, Inc., abandoned the job. Although the complaint is not part of this record, Ms. Harvey commenced a legal action against Thomson Homes, Inc., but not Petitioner. She obtained a default final summary judgment against Thomson Homes, Inc., on March 30, 2001, for a total sum of $46,267.32, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, services and material provided. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from the construction lender. On May 3, 2001, Ms. Harvey filed a claim with the Construction Industries Recovery Fund (Recovery Fund). In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Harvey answered "yes," explaining she had "filed lawsuit." Ms. Harvey probably filed her claim within two years of when Thomson Homes, Inc., abandoned her job. By the end of March 1999, Mr. Thomson informed Ms. Harvey that his wife had fired him, so he could not work on her home anymore. A change in qualifier does not mean that Thomson Homes, Inc., would necessarily abandon the job, but, as noted in the Conclusions of Law, abandonment presumptively arises upon the expiration of 90 days without work. No work took place on Ms. Harvey's home after Mr. Thomson withdrew as qualifier, so presumptive abandonment took place by the end of June 1999--after May 3, 1999, which is two years prior to the date on which Ms. Harvey filed her claim. By letter dated June 5, 2001, from James Brogan of WEI Consulting Group to Ms. Harvey, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in Bankruptcy Court in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home, but the furniture was no longer available. On February 28, 2003, Respondent issued an Order approving Ms. Harvey's claim of $25,000 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Harvey is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Harvey and Respondent, contests the payment to Ms. Harvey and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Harvey's claim because she had made insufficient efforts to satisfy the judgment; she had failed to submit all required exhibits with her claim; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Additionally, the petition contests the automatic suspension because the payment to Ms. Harvey is not authorized, her claim is incomplete, and her judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3541 involves the claim of John and Kathleen Whitesides. The Whitesides, who lived at the time in Juno Beach, Florida, entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, the Whitesides agreed to pay Thomson Homes, Inc., $154,094 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Whitesides paid Thomson Homes, Inc., $5000 and secured a construction loan, Thomson Homes, Inc., never commenced construction. In a complaint filed April 3, 2000, the Whitesides commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction. The Whitesides obtained a default final judgment against Thomson Homes, Inc., on December 21, 2000, for a total sum of $20,146.67, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: "Defendant is in breach of the Contract dated February 7, 1999, and has received unjust enrichment from Defendant's failure to fulfill the terms of the Contract to build a home for Plaintiffs." On August 9, 2001, David Tassell, the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., stated, in an acknowledged statement, that he had performed "numerous" real property searches in Palm Beach and Martin counties' public records and determined that Thomas Homes, Inc., "owns no real property in Martin County." The omission of Palm Beach County in the statement is unexplained. Mr. Tassell's statement adds that he has retained a private investigator, who confirmed that Thomson Homes, Inc., owns no boats, planes, or automobiles. On August 10, 2001, the Whitesides filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Whitesides answered "yes," but did not supply an explanation in the following blank. The completed questionnaire accompanying the claim states that the Whitesides discovered the violation in September 1999 and that it occurred in July to August 1999. On September 17, 2002, Respondent issued an Order approving the Whitesides' claim of $18,526.67 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Whitesides are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. The Whitesides probably filed their claim within two years of when they reasonably should have discovered that Thomson Homes, Inc., had wrongfully failed to commence construction, as is required for reasons set forth in the Conclusions of Law. As noted in the Conclusions of Law, presumptive abandonment arose when Thomson Homes, Inc., after entering the contract, performed no work for 90 days. Six months elapsed from the signing of the contract to the date that is two years prior to the filing of the claim. Although the record is not well-developed on the point, it is more likely than not that due diligence did not require that the Whitesides discover the abandonment within the first 90 days after it had presumptively arisen. The Whitesides' judgment is probably based on a violation of Section 489.129(1)(g), (j), or (k), Florida Statutes, as is required for reasons set forth in the Conclusions of Law. Although the record is not well-developed on this point either, it is more likely than not that the judgment is based on Thomson Homes' abandonment after entering into the contract. The judgment does not state this basis explicitly, but the complaint, on which the judgment is based, alleges abandonment. On December 23, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., contests the payment to the Whitesides and the automatic suspension of Petitioner's license. The petition contests the payment of the Whitesides' claim because they did not file certified copies of the final judgment and levy and execution documents and their judgment did not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; Petitioner received no notice of the hearing that resulted in the Order to pay the Whitesides and suspend Petitioner's license; the Whitesides' claim is incomplete; and the Whitesides' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3542 involves the claim of Richard and Kathleen Beltz. The Beltzes entered into a construction contract with Thomson Homes, Inc., on July 13, 1999. Pursuant to the agreement, the Beltzes agreed to pay Thomson Homes, Inc., $35,500 for a lot and $140,500 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Beltzes paid Thomson Homes, Inc., $17,283.70, Thomson Homes, Inc., never appeared at the closing, which had been scheduled for August 10, 1999. Nor did Thomson Homes, Inc., ever commence construction. The record does not disclose the extent, if any, to which Thomson Homes, Inc., completed construction. The Beltzes' discovery of Thomson Homes' failure to commence construction was hampered by the fact that they resided in California at the time. However, the Beltzes had obviously discovered the wrongful acts and omissions of Thomson Homes, Inc., by September 29, 1999, when they sent a letter to Petitioner demanding that he return the money that they had paid Thomson Homes, Inc. On October 19, 1999, the Beltzes signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. The completed questionnaire attached to the claim does not ask if the claimants had made a diligent effort to collect payment from the contractor. For reasons set forth in the Conclusions of Law, a claim must follow a judgment, so, the Beltzes could not file a valid claim until they had obtained a judgment. Two years from September 29, 1999, at which point the Beltzes obviously knew of a violation, requires that they file the claim, on an already- secured judgment, prior to September 29, 2001. In a complaint filed February 4, 2002, the Beltzes commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Beltzes obtained a default final summary judgment against Thomson Homes, Inc., on May 22, 2002, for a total sum of $23,280.20, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed some work on the project. However, Defendant breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay Lienors who provided labor, service and materials to Plaintiffs [sic] real property, Construction Liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay Lienors, the misapplication of construction funds and financial mismanagement, Plaintiffs were forced to borrow additional funds from their construction lender. By unacknowledged statement dated August 23, 2002, Ms. Beltz declared that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Ms. Beltz stated that she searched the database of the "Department of Motor Vehicles in Palm Beach County" in May 2000 and found no vehicles or boats registered to Thomson Homes, Inc. Lastly, she reported that she contacted the "Federal Aviation Association" at an unspecified time and found no "airplanes" registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the Beltzes' claim of $17,222.78 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Beltzes are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Beltzes and Respondent, contests the payment to the Beltzes and the automatic suspension of Petitioner's license. The petition contests the payment of the Beltzes' claim because they did not submit all of the necessary exhibits with their claim; their judgment is against Thomson Homes, Inc., and not Petitioner; and their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; the Beltzes' claim is incomplete; and the Beltzes' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3543 involves the claim of Keith and Karen Deyo. The Deyos entered into a construction contract with Thomson Homes, Inc., on October 31, 1998. Pursuant to the agreement, the Deyos agreed to pay Thomson Homes, Inc., $25,500 for a lot and $123,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Although the Deyos clearly suffered damages from the acts and omissions of Thomson Homes, Inc., the record does not disclose how much they paid the company, how much they had to pay unpaid suppliers and laborers, and how much construction the company completed before abandoning the job. Thomson Homes, Inc., began construction on the Deyos' home about 30-45 days after the parties signed the contract, but all work stopped in July 1999. In an undated complaint, the Deyos commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment] of the project prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Deyos obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $55,458.64, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant partially performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay lienors who provided labor, services and materials to Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 27, 2000, the Deyos signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. A cover letter dated May 8, 2000, suggests that the Deyos mailed their claim a couple of weeks after signing it, so it was probably filed in mid-May 2000, although their questionnaire bears a revision date of November 2001, which would be beyond two years after the violation. In the questionnaire, the Deyos did not respond to the question asking if they had made a diligent effort to collect payment from the contractor. By an undated and unacknowledged statement, Mr. Deyo declared that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that he had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Mr. Deyo stated that he searched the database of the "department of motor vehicles in Palm Beach County" in on April 14, 2000, and found no motor vehicles or boats registered to Thomson Homes, Inc. Lastly, he reported that he contacted the "Federal Aviation Association" on April 21, 2000, and found no "airplanes" registered to Thomson Homes, Inc. On January 22, 2003, Respondent issued an Order acknowledging the Deyos' claim of $55,458.64, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Mr. Deyo is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On February 3, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Deyos' attorney who represented them in the action against Thomson Homes, Inc., contests the payment to the Deyos and the automatic suspension of Petitioner's license. The petition contests the payment of the Deyos' claim and suspension of Petitioner's license because Petitioner did not receive notice of the hearing at which Respondent entered the Order; the Deyos did not satisfy all requirements for payment from the Recovery Fund; their claim was not accompanied by certified copies of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3544 involves the claim of Sylvia Reinhardt. Ms. Reinhardt entered into a construction contract with Thomson Homes, Inc., on October 14, 1998. Pursuant to the agreement, Ms. Reinhardt agreed to pay Thomson Homes, Inc., $45,000 for a lot and $147,150 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After Ms. Reinhardt paid Thomson Homes, Inc., $144,769, directly and indirectly, by way of her construction lender, the house was little more than half complete when Thomson Homes, Inc., abandoned the job. Thomson Homes also failed to pay various suppliers that filed liens, so Ms. Reinhardt had to pay $8550.41 to RTS Roofing, $882 to Palm Beach Garage Door, and $3421.32 to Woodworks, Inc. In an undated complaint filed in 1999 (actual date illegible), Ms. Reinhardt commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Reinhardt obtained a final summary judgment against Thomson Homes, Inc., on March 28, 2000, for a total sum of $61,471.15, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff had to satisfy. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete their [sic] home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from her construction lender. On April 17, 2000, Ms. Reinhardt filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Reinhardt answered "yes" and explained: "Telephone calls were unanswered. Certified mail requesting response were [sic] never answered. Our attorney made written and personal contact with the owner and there was no intention to pay." The claim states that the violation took place in July 1999. By acknowledged statement dated July 21, 2000, Ms. Reinhardt declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Reinhardt stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found one parcel of property owned by Thomson Homes, Inc., and valued at $115,387, but this had been sold to "Joan Thomson" on February 1, 2000. Ms. Reinhardt stated that she had found tangible personal property worth $5000. She added that she had not found any motor vehicles registered with the Department of Highway Safety and Motor Vehicles, nor had she found anything registered with the "FAA." On November 26, 2002, Respondent issued an Order acknowledging Ms. Reinhardt's claim of $58,661.44, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Reinhardt is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 24, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Reinhardt and Respondent, contests the payment to Ms. Reinhardt and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Reinhardt's claim and suspension of Petitioner's license because Ms. Reinhardt did not submit certified copies of the levy and execution documents; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3545 involves the claim of Louis and Ann Mahoney. The Mahoneys entered into a construction contract with Thomson Homes, Inc., on June 28, 1999, for the construction of a home in Martin County. Pursuant to the agreement, the Mahoneys agreed to pay Thomson Homes, Inc., $32,000 for a lot and $149,000 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the Mahoneys paid Thomson Homes, Inc., $14,500, directly and indirectly, by way of their construction lender, they suffered damages due to the acts and omissions of Thomson Homes, Inc., although, again, the record does not describe specifically how Thomson Homes caused them damage. In an undated complaint that bears no filing date, the Mahoneys commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Mahoneys obtained a final summary judgment against Thomson Homes, Inc., on April 13, 2000, for a total sum of $43,084.49, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiffs' deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, and/or services provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and materials for the construction of Plaintiffs [sic] residence, a construction lien was recorded against Plaintiffs' property, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 30, 2000, the Mahoneys signed a claim under the Recovery Fund. Although the claim form bears no filing date, the completed questionnaire attached to the claim was filed on May 3, 2000, so that is the likely filing date of the claim. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Mahoneys answered "yes" and explained: "This is explained in General Allegations, enclosed with this paperwork." Evidently, the reference is to a copy of the circuit court complaint. By acknowledged statement dated April 8, 2002, Mr. Mahoney declared that he had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy his judgment. Mr. Mahoney stated that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that an internet search had disclosed no property owned by Thomson Homes, Inc. Mr. Mahoney stated that the "department of motor vehicles in Palm Beach County" found no motor vehicles or boats registered to Thomson Homes, Inc., and that the "FAA" had found nothing registered to Thomson Homes, Inc. On February 28, 2003, Respondent issued an Order acknowledging the Mahoneys' claim of $38,185, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Mr. Mahoney is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Mahoneys and Respondent, contests the payment to the Mahoneys and the automatic suspension of Petitioner's license. The petition contests the payment of the Mahoneys' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3546 involves the claim of Dennis and Carolyn DeStefanis. The DeStefanises entered into a construction contract with Thomson Homes, Inc., on April 7, 1999. Pursuant to the agreement, the DeStefanises agreed to pay Thomson Homes, Inc., $137,455 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the DeStefanises paid Thomson Homes, Inc., $15,765, directly and indirectly, by way of their construction lender, Thomson Homes, Inc. never did any work, except to contract with a surveyor, who, unpaid, filed a claim of lien against the DeStefanises's lot. In an undated complaint bearing no filing date, the DeStefanises commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The DeStefanises obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $36,701.87, including attorneys' fees and costs. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant, [sic] breached its contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project. [sic] As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 19, 2000, the DeStefanises filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the DeStefanises answered "yes" and explained: "Went to DBPR Investigative Services, hired Attorney Barry W. Taylor [attorney in circuit court action], got Final Summary Judgment against Thomson Homes, Inc." On March 20, 2003, Respondent issued an Order acknowledging the DeStefanises' claim of $34,965.52, approving the payment of $15,765 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the DeStefanises are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On April 7, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the DeStefanises and Respondent, contests the payment to the DeStefanises and the automatic suspension of Petitioner's license. The petition contests the payment of the DeStefanises' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. The petition contests the suspension of Petitioner's license on the additional ground that he was not the qualifier for Thomson Homes, Inc., when it and the DeStefanises entered into the construction contract. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3547 involves the claim of James and Donna Barr. The Barrs entered into a construction contract with Thomson Homes, Inc., on September 12, 1998. Pursuant to the agreement, the Barrs agreed to pay Thomson Homes, Inc., $30,000 for a lot and $140,900 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. The Barrs paid Thomson Homes, Inc., $8500 in the form of a down payment. They or their construction lender paid Thomson Homes, Inc., considerably more money and suffered the imposition of claims of lien by unpaid subcontractors and suppliers, but, after negotiating with the bank, emerged from the transaction having lost only the $8500 down payment. Thomson Homes, Inc., obtained permits in April 1999 and started construction in May 1999. Before abandoning the job, Thomson Homes, Inc., worked on the home in May, June, and July of 1999. The Barrs and their lender did not make additional payments after the Barrs found the Thomson Homes, Inc., office empty on August 1, 1999. In a complaint filed October 6, 1999, the Barrs commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Barrs obtained a final summary judgment against Thomson Homes, Inc., on May 8, 2000, for a total sum of $45,435.62, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, partially performed work under the Contract. However, Defendant breached the contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs will be compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienors, the misapplication of construction funds and financial mismanagement Plaintiffs will be forced to borrow additional funds from their construction lender. On June 2, 2000, the Barrs filed a claim under the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Barrs answered "yes" and explained: "I have looked into the assets of Thomson Homes Inc. and they do not have any. My affidavit is attached." The completed questionnaire states that the Barrs discovered the violation on August 11, 1999. They therefore failed to file their claim within two years of the discovery of the violation. By acknowledged statement dated May 23, 2000, Ms. Barr declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Barr stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared she had found no property owned by Thomson Homes, Inc., in Palm Beach County. Ms. Barr stated that the Department of Highway Safety and Motor Vehicles found no motor vehicles or boats registered to Thomson Homes, Inc., and that the internet site of the "FAA" had revealed nothing registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the payment of the Barrs' claim of $8500 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Barrs are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Barrs and Respondent, contests the payment to the Barrs and the automatic suspension of Petitioner's license. The petition contests the payment of the Barrs' claim and suspension of Petitioner's license because they did not submit a certified copy of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3633 involves the Joanne Myers. Ms. Myers entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, Ms. Myers agreed to pay Thomson Homes, Inc., $29,500 for a lot and $125,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Ms. Myers directly or indirectly paid Thomson Homes, Inc., $12,840. According to Ms. Myers' claim, Thomson Homes, Inc., never commenced construction before going out of business in August 1999. In an undated complaint bearing no filing date, Ms. Myers commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Myers obtained a final summary judgment against Thomson Homes, Inc., on May 31, 2000, for a total sum of $28,307.77, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant breached the contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and/or materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff will have to satisfy. As a result of Defendant abandoning the project, Plaintiff will be compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff will be forced to borrow additional funds from her construction lender. On September 18, 2000, Ms. Myers filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Myers answered "yes" and explained: "Contractor closed corporate office--would not answer telephone calls." By letter dated November 30, 2000, from James Brogan of WEI Consulting Group to Ms. Myers, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home. On February 28, 2003, Respondent issued an Order approving the payment of Ms. Myers' claim of $14,080.66 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Myers is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Myers and Respondent, contests the payment to Ms. Myers and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Myers' claim and suspension of Petitioner's license because she did not submit evidence of a diligent search for assets; she did not submit all of the required exhibits; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. On January 4, 2004, Ms. Myers died. However, the probate court of Lancaster County, Pennsylvania, issued letters testamentary on her estate to James W. Myers III, in whose name Ms. Myers' claim is now being prosecuted. At the hearing, Petitioner contended that most, if not all, of the claims failed because the claimants had not exercised reasonable diligence in searching for assets, although Petitioner has dropped this contention in its proposed recommended order. In his petitions for hearing, Petitioner raised this contention only as to Ms. Myers. Ms. Myers, as well as the remainder of the claimants, made or caused to be made a reasonable search and inquiry for the assets of Thomson Homes, Inc. It is obvious that Thomson Homes, Inc., had no assets by the first letter from Mr. Brogan, dated November 30, 2000, nor did it have assets when Mr. Brogan issued his later letter on June 5, 2001, or when the attorney issued his affidavit on August 9, 2001. What is reasonable, in terms of a search, is dictated here by the fact that Thomson Homes, Inc., had no discoverable assets against which it could be made to answer for the considerable fraud that it perpetrated against these nine claimants. Respondent provided all of the parties, including Petitioner, with notice of its hearings at which it entered Recovery Fund orders. The petitions contend that Petitioner received no such notice in the Whitesides and Deyos cases. Although not litigated at the hearing, the presumption of notice, pursuant to the recitations set forth in each of Respondent's orders, results in a finding that Petitioner received timely notice in all cases.

Recommendation It is RECOMMENDED that Respondent enter a final order dismissing the claims against the Recovery Fund of the Beltzes and Barrs; paying the claims against the Recovery Fund of the remaining claimants, pursuant to the provisions of the orders of Respondent already issued in these cases and pursuant to the provisions of Section 489.143(1)-(6), Florida Statutes; and dismissing Respondent's request for the automatic suspension of Petitioner's license, pursuant to Section 489.143(7), Florida Statutes, without prejudice to any separate disciplinary proceedings that Respondent has commenced or may commence against Petitioner or others for the acts and omissions involved in these nine cases. DONE AND ENTERED this 17th day of February, 2004, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 2004. COPIES FURNISHED: Bruce G. Kaleita Law Office of Bruce G. Kaleita, P.A. 1615 Forum Place, Suite 500 West Palm Beach, Florida 33401 Adrienne C. Rodgers Assistant General Counsel Department of Business and Professional Regulation 1940 North Monroe Street, Suite 60 Tallahassee, Florida 32399-1023 Tim Vaccaro, Director Construction Industry Licensing Board Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Nancy Campiglia, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (10) 120.569120.57468.631489.1195489.129489.132489.140489.141489.14357.111
# 2
FCCI INSURANCE GROUP vs AGENCY FOR HEALTH CARE ADMINISTRATION, 05-002206 (2005)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jun. 20, 2005 Number: 05-002206 Latest Update: Jul. 18, 2006

The Issue The issue for determination is whether Intervenors are entitled to reasonable attorney fees and costs pursuant to Section 120.595, Florida Statutes (2003).1

Findings Of Fact Petitioner is an insurer and carrier within the meaning of Subsections 440.02(4) and 440.02(38), Florida Statutes (2005), and Florida Administrative Code Rule 69L-7.602(1)(w).2 Petitioner is licensed in the state as a workers' compensation insurance carrier (carrier).3 Respondent is a state agency within the meaning of Subsection 440.02(3), Florida Statutes (2005), and Florida Administrative Code Rule 69L-7.602(1)(b). In relevant part, Respondent is responsible for resolving reimbursement disputes between a carrier and a health care provider. Intervenors are health care providers within the meaning of Subsection 440.13(1)(h), Florida Statutes (2005), and Florida Administrative Code Rule 69L-7.602(1)(u). Each Intervenor is a health care facility within the meaning of Subsection 440.13(1)(g), Florida Statutes (2005). Intervenors seek an award of attorney fees and costs against Petitioner pursuant to Sections 57.105 and 120.595, Florida Statutes (2003). The proceeding involving Section 57.105, Florida Statutes (2003), is the subject of a separate Final Order entered on the same date as this Recommended Order. The scope of this Recommended Order is limited to Section 120.595, Florida Statutes (2003). Intervenors allege that Petitioner is the "non- prevailing adverse party" in an underlying proceeding and participated in the underlying proceeding for an "improper purpose" as the quoted terms are defined, respectively, in Subsections 120.595(1)(e)3. and 120.595(1)(e)1., Florida Statutes (2003). The underlying proceeding involves eight consolidated Petitions for Administrative Hearing. Petitioner filed each Petition for Administrative Hearing after Respondent determined Petitioner had improperly discounted the amount of reimbursement Petitioner paid for hospital services that Intervenors provided to eight patients from March 13, 2004, through February 11, 2005. From April 13 through May 23, 2005, Respondent issued separate orders directing Petitioner to pay the disputed amounts pursuant to Subsection 440.13(7), Florida Statutes (2005). From June 1 through June 21, 2005, Petitioner filed eight separate Petitions for Administrative Hearing. The eight petitions were subsequently consolidated into one underlying proceeding. Petitioner is the non-prevailing adverse party in the underlying proceeding. On December 8, 2005, Petitioner filed a Notice of Voluntary Dismissal in the underlying proceeding. On December 9, 2005, Intervenors filed their motion for attorney fees based on Section 120.595, Florida Statutes (2003). The formal hearing in the underlying proceeding was set for January 18, 2006. The ALJ amended the issue for the formal hearing to exclude the original reimbursement dispute and to limit the scope of the formal hearing to the fee dispute. The ALJ did so to avoid delay in the resolution of the proceeding. The fee dispute at issue in this proceeding includes only six of the original eight reimbursement disputes because Intervenors were not the medical providers in two of the original eight disputes.4 In the six reimbursement disputes involving Intervenors, Respondent ordered Petitioner to pay additional reimbursements in the aggregate amount of $54,178.52. Approximately $51,489.27 of the $54,178.52 in additional reimbursement involved inpatient hospital services provided to one patient.5 The remaining $2,689.25 in additional reimbursement involved outpatient hospital services in the emergency room.6 Subsection 440.13(12), Florida Statutes (2005), mandates that a three-member panel must determine statewide schedules for reimbursement allowances for inpatient hospital care. The statute requires hospital outpatient care to be reimbursed at 75 percent of "usual and customary" charges with certain exceptions not relevant to this proceeding. Notwithstanding the statutory mandate to schedule reimbursement rates for hospital inpatient services, the inpatient services at issue in the underlying proceeding were apparently unscheduled inpatient services. By letter dated April 13, 2005, Respondent ordered Petitioner to pay Intervenor, Holmes Regional Medical Center, Inc. (Holmes), an additional reimbursement in the amount of $51,489.27. The total reimbursement to Holmes was 75 percent of the charges that Holmes submitted to Petitioner for reimbursement.7 Respondent interprets Subsection 440.13(12), Florida Statutes (2005), to authorize reimbursement of both unscheduled inpatient hospital services and outpatient hospital services at the same rate. There is no dispute that Respondent reimburses unscheduled inpatient hospital services and outpatient hospital services at 75 percent of the "usual and customary" charges. The dispute in the underlying proceeding was over the meaning of the phrase "usual and customary" charges. Petitioner challenged the interpretation asserted by Respondent and Intervenors. Respondent and Intervenors contended that the quoted statutory phrase means Intervenors' usual and customary charges evidenced in a proprietary document identified in the record as the "charge master." Each Intervenor maintains its own charge master, and the information in each charge master is proprietary and confidential to each Intervenor. Petitioner asserted that the statutory phrase "usual and customary" charges means the usual and customary charges imposed by other hospitals in the community in which Intervenors are located. Petitioner maintains a data base that contains information sufficient to determine the usual and customary charges in each community. Petitioner did not participate in the underlying proceeding for an improper purpose within the meaning of Subsection 120.595(1)(e)1., Florida Statutes (2003). Rather, Petitioner presented a good faith claim or defense to modify or reverse the then-existing interpretation of Subsection 440.13(12), Florida Statutes (2005). Petitioner had a reasonable expectation of success. The statutory phrase "usual and customary" charges is not defined by statute. Nor has the phrase been judicially defined. Respondent bases its interpretation of the disputed phrase on two agency final orders and relevant language in the Florida Workers' Compensation Reimbursement Manual for Hospitals (2004 Second Edition) (the Manual). The Manual is developed by the Florida Department of Financial Services (DFS).8 The Manual interprets the quoted statutory phrase to mean the "hospital's charges." However, after the effective date of the Manual in 2004, DFS developed a proposed change to the Manual that, in relevant part, interprets "usual and customary" charges to mean the lesser of the charges billed by the hospital or the median charge of hospitals located within the same Medicare geographic locality.9 The trier of fact does not consider the new interpretation of the disputed statutory phrase as evidence relevant to a disputed issue of fact. As Respondent determined in an Order to Show Cause issued on February 16, 2006, and attached to Intervenors' PRO, "what constitutes 'usual and customary' charges is a question of law, not fact." The ALJ considers the new interpretation proposed by DFS for the purpose of determining the reasonableness of the interpretation asserted by Petitioner in the underlying proceeding. The ALJ also considers the new DFS interpretation to determine whether the interpretation asserted by Petitioner presented a justiciable issue of law. Intervenors assert that Petitioner's improper purpose in the underlying proceeding is evidenced, in relevant part, by Petitioner's failure to initially explain its reduced reimbursement to Intervenors with one of the codes authorized in Florida Administrative Code Rule 69L-7.602(5)(n) as an explanation of bill review (EOBR). None of the EOBR codes, however, contemplates a new interpretation of the statutory phrase "usual and customary" charges. Intervenors further assert that Petitioner's improper purpose in the underlying proceeding is evidenced, in relevant part, by Petitioner's failure to respond to discovery. However, responses to discovery would not have further elucidated Petitioner's rule-challenge. Petitioner stated eight times in each Petition for Administrative Hearing that Florida Administrative Code Rule 69L-7.501, the DFS rule incorporating the Manual by reference: [S]hould be read to allow recovery of 75% of the usual and customary fee prevailing in the community, and not 75% of whatever fee an individual provider elects to charge. Respondent and Intervenors were fully aware of the absence of statutory and judicial authority to resolve the issue. Petitioner did raise at least one factual issue in each Petition for Administrative Hearing. Petitioner alleged that Respondent's decision letters ordering Petitioner to pay additional reimbursement amounts had no legal effect because Respondent acted before each provider requested and received the carrier's reconsidered reimbursement decision. The absence of a formal hearing in the underlying proceeding foreclosed an evidential basis for a determination of whether each provider in fact requested and received a reconsidered reimbursement decision before the date Respondent ordered Petitioner to pay additional reimbursements. In this fee dispute, Petitioner presented some evidence to support the factual allegation and thereby established the presence of a justiciable issue of fact. It is not necessary for Petitioner to present enough evidence to show that Petitioner would have prevailed on that factual issue in the underlying proceeding. If the letters of determination issued by Respondent were without legal effect, Petitioner would not have waived its objections to further reimbursement within the meaning of Subsection 440.13(7)(b), Florida Statutes (2005). A determination that Petitioner did, or did not, submit the required information is unnecessary in this proceeding. During the formal hearing in this proceeding, Petitioner called an expert employed by a company identified in the record as Qmedtrix. The testimony showed a factual basis for the initial reimbursement paid by Petitioner. It is not necessary for Petitioner to show that this evidence was sufficient to prevail on the merits in the underlying case. The evidence is sufficient to establish justiciable issues of fact in the underlying case. In this proceeding, Petitioner submitted some evidence of justiciable issues of fact in the underlying proceeding. Petitioner need not submit enough evidence in this fee dispute to show Petitioner would have prevailed on these factual issues in the underlying proceeding. Intervenors are not entitled to a presumption that Petitioner participated in this proceeding for an improper purpose in accordance with Subsection 120.595(1)(c), Florida Statutes (2003). Although Petitioner was the non-prevailing party in two previous administrative hearings involving the same legal issue, the two proceedings were not against the same prevailing hospital provider and did not involve the same "project" as required in the relevant statute. Intervenors seek attorney fees in the amount of $36,960 and costs in the amount of $2,335.37 through the date that Petitioner voluntarily dismissed the underlying proceeding. Absent a finding that Petitioner participated in the underlying proceeding for an improper purpose, it is unnecessary to address the amount and reasonableness of the attorney fees and costs sought by Intervenors. If it were determined that Petitioner participated in the underlying proceeding for an improper purpose, the trier of fact cannot make a finding that the proposed attorney fees and costs are reasonable. Such a finding is not supported by competent and substantial evidence. The total attorney fees and costs billed in the underlying proceeding were charged by six or seven attorneys or paralegals employed by the billing law firm. However, the fees and costs at issue in this proceeding exclude any time and costs charged by paralegals and include only a portion of the total fees and costs charged by the attorneys. The total amount of time billed and costs incurred in the underlying proceeding is evidenced in business records identified in the record as Intervenors' Exhibits 20-23. However, those exhibits do not evidence the reasonableness of the fees and costs billed by the attorneys.10 Either the testimony of the billing attorneys or the actual time slips may have been sufficient to support a finding that the attorney fees and costs are reasonable. However, Intervenors pretermitted both means of proof. Intervenors asserted that the time slips contain information protected by the attorney-client privilege. However, Intervenors neither submitted redacted time slips nor offered the actual time slips for in-camera review. Nor did Intervenors allow the attorneys to testify concerning unprivileged matters. The absence of both the testimony of the attorneys and the time slips is fatal. The fact-finder has insufficient evidence to assess the reasonableness of the fees and costs, based on the novelty and difficulty of the questions involved. Intervenors' expert opined that the attorney fees and costs are reasonable. The expert based her opinion, in relevant part, on her review of the actual time slips maintained by each attorney. However, Petitioner was unable to review the time slips before cross-examining the expert. In lieu of the actual time slips, Intervenors submitted a summary of the nature of the time spent by each attorney. The summary is identified in the record as Intervenors' Exhibit 2. Petitioner objected to Intervenors' Exhibit 2, in relevant part, on the ground that it is hearsay. The ALJ reserved ruling on the objection and invited each side to brief the issue in its respective PRO. The paucity of relevant citations in the PROs demonstrates that neither side vigorously embraced the ALJ's invitation. Intervenors' Exhibit 2 is hearsay within the meaning of Subsection 90.801(1)(c), Florida Statutes (2005).11 The author of Intervenors' Exhibit 2 summarized the unsworn statements of attorneys from their time slips and submitted those statements to prove the truth of the assertion that the time billed was reasonable. Intervenors made neither the attorneys nor their time slips available for cross examination.12 Even if the summary were admissible, the summary and the testimony of its author are insufficient to show the attorney fees and costs were reasonable. The insufficiency of the summary emerged during cross-examination of its author. The author is the lone attorney from the billing law firm who testified at the hearing. Q. What other information did you look at to decide what time to actually bill . . .? A. The information I used was the information from the actual bill. Q. If we look at the first entry . . . were you the person that conducted that telephone conference? A. No, I wasn't. Transcript (TR) at 510-511. Q. In other words, [the entries] go with the date as opposed to the event [such as a motion to relinquish]? A. That's correct. Q. So if I wanted to know how much time it took you to actually work on the motion to relinquish, I would have to look at each entry and add up all the hours to find out how long it took you to do one motion. Is that how I would do that? A. It would be difficult to isolate that information from this record, we bill and explain in the narrative what work is performed each day, and unless that was the single thing worked on for several days, there would be no way to isolate the time, because we don't bill sort of by motion or topic. . . . Q. Well, if I'm trying to decide whether the time billed is reasonable, wouldn't I need to know how much time was spent on each task? A. I'm not sure how you would want to approach that. . . . Looking at this document, it does not give you that detail. It doesn't provide that breakout of information. Q. Is there a way for us to know who you spoke with on those entries? A. The entry . . . doesn't specify who participated in the conference. I don't recall what the conference entailed . . . . And many of these entries are from months ago, and I can't specifically recall on that date if I was involved in a conference and who else might have been there. . . . And so my guess is where the conference is listed on a day when lots of activity was performed on behalf of the client, most of it in this case was research. TR at 516-521.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a final order denying the motion for attorney fees and costs. DONE AND ENTERED this 27th day of April, 2006, in Tallahassee, Leon County, Florida. S DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 2006.

Florida Laws (12) 120.52120.56120.569120.57120.595120.68440.02440.1357.105689.2590.80190.956
# 3
BRADLEY WAYNE KLINE vs DEPARTMENT OF FINANCIAL SERVICES, 07-005243RU (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Nov. 16, 2007 Number: 07-005243RU Latest Update: Dec. 06, 2007

The Issue The issue is whether the Petition to Determine the Invalidity of Agency Statements should be dismissed.

Findings Of Fact Petitioner is a licensed insurance agent, and was the subject of the Administrative Complaint filed by the Department that became DOAH Case No. 07-1218PL. The Administrative Complaint alleged that Petitioner violated Section 626.611(16), Florida Statutes, by selling unregistered viatical settlement contracts to four elderly individuals in 2003. Most pertinent to this case, the Administrative Complaint alleged: Viatical settlement contracts are investment contracts within the meaning of section 517.021(21)(q), Florida Statutes, and are therefore securities requiring registration pursuant to section 517.07, Florida Statutes. As to each of the transactions described below, the viatical settlement contracts sold by [Petitioner] . . . were unregistered securities.[3] The Administrative Complaint also alleged that Petitioner violated a number of other statutes (e.g., Sections 626.611(5), (7), and (9), and 626.621(9), Florida Statutes) based upon misrepresentations made by Petitioner in connection with the sales of the viatical settlement contracts. On October 9, 2007, Judge Canter issued a Recommended Order in DOAH Case No. 07-1218PL finding that Petitioner violated Sections 626.611(5), (7), (9), and (16) and 626.621(9), Florida Statutes, and recommending that the Department revoke Petitioner’s license.4 The Recommended Order included the following findings and conclusions pertinent to the issue framed by the petition: [Petitioner] misrepresented the risk character of viaticals in his discussions with the investors involved in this case. He had a motive to downplay the true risk character of the viaticals, because if he received a commission for every sale of a viatical. If [Petitioner] had informed the investors of the true risk character of viaticals, the investors might not have purchased the viaticals. The definition of "security" in Section 517.021, Florida Statutes, was amended in 2006 to specifically identify "viatical settlement investment" as a type of security. [Petitioner] does not dispute that a viatical is a security. There is no dispute that the viaticals sold by [Petitioner], which are the subject of this case, were not registered securities when [Petitioner] sold them in 2003. * * * [Petitioner] objects to being charged with selling unregistered securities, because viaticals were not specifically defined as securities until 2006. [The Department] claims that, although viaticals were not specifically defined as securities in Section 517.021, Florida Statutes, in 2003, the prior definition, which included "investment contracts," was sufficient to include viaticals. [The Department] further asserts that viaticals have all the elements of a security as established by the case law. [The Department] is correct that a viatical met the definition of a security under the law that existed in 2003. However, the Administrative Law Judge does not agree with [the Department]'s argument that this interpretation of the law was clear and settled in 2003. The regulation of viaticals under the insurance code was a cause of confusion. Under Florida Administrative Code Rule 69B-231.080, the penalty for each violation of Subsections 626.611(5) and (7), Florida Statutes, is a six-month suspension; the penalty for each violation of Subsection 626.611(9), Florida Statutes, is a nine month suspension; and the penalty for each violation of Subsection 626.611(16), Florida Statutes, is a 12-month suspension. * * * 56. [U]nder Florida Administrative Code Rule 69B-231.040(1)(a), the “penalty per count” cannot exceed the highest penalty for any violation under the count, which in this case is the 12-month suspension for sale of an unregistered security. Therefore, based on the four counts of the Administrative Complaint, the “total penalty” would be four years. * * * 58. A mitigating factor is the unsettled state of the law in 2003 regarding the legal status of viaticals as securities. However, even if the penalty for the sale of unlicensed securities were eliminated altogether and the penalty per count were reduced to a nine-month suspension, the total penalty would be suspension for 36 months. Subsection 626.641(1), Florida Statutes, does not permit Petitioner to suspend a license for more than two years. Therefore, the required penalty in this case is revocation of [Petitioner]’s license. Petitioner has filed exceptions to the Recommended Order, and the Department has not yet entered a Final Order.

Florida Laws (11) 120.54120.56120.57120.68517.021517.07517.12626.611626.621626.64190.202
# 4
EAST COAST SURGERY CENTER vs DEPARTMENT OF FINANCIAL SERVICES, DIVISION OF WORKERS' COMPENSATION, 17-005837 (2017)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Oct. 23, 2017 Number: 17-005837 Latest Update: Nov. 30, 2018

The Issue The issue to be decided in this proceeding is whether the Reimbursement Dispute Dismissal issued by Respondent, Department of Financial Services, Division of Workers’ Compensation (the “Department”), should be reversed due to equitable tolling or some other recognized excuse for untimely submission of the reimbursement dispute.

Findings Of Fact Petitioner is a business operating in Daytona Beach, Florida. The nature of Petitioner’s business was not made part of the record. In approximately June 2017, Petitioner submitted a claim to the Department, claiming payment for certain (undisclosed) services or expenditures. The Department issued an Explanation of Bill Review (“EOBR”) in response to Petitioner’s claim. The EOBR set forth the amount of reimbursement the Department would allow for Petitioner’s claim. The EOBR was received by Petitioner on July 10, 2017. Upon receipt of the EOBR, Petitioner had 45 days, i.e., until August 24, 2017, to challenge the Department’s determination of the reimbursement amount. Not satisfied that the amount allowed by the Department was correct, Petitioner challenged the determination by submitting a Petition for Resolution of Reimbursement Dispute (the “Petition”) on DFS Form 3160-0023. The Petition was signed on August 8, 2017. However, Petitioner did not immediately submit the Petition on that date, despite being aware of the 45-day time limit for submitting such forms for relief. Petitioner did not mail the Petition until August 25, 2017, one day after the deadline for doing so. The Certified Mail Receipt for Petitioner’s mailing is clear and unambiguous, clearly showing the date. Petitioner did not present any evidence as to factors which might excuse the late filing of its Petition. The only reasons cited were that Petitioner was awaiting information from two claims management services, Sedgwick and Foresight, before submitting its Petition. Petitioner, through its witness at final hearing, admitted its error in failing to timely file the Petition.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that Respondent, Department of Financial Services, Division of Workers’ Compensation, enter a Final Order upholding its Reimbursement Dispute Dismissal. DONE AND ENTERED this 11th day of January, 2018, in Tallahassee, Leon County, Florida. S R. BRUCE MCKIBBEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of January, 2018. COPIES FURNISHED: Taylor Anderson, Esquire Department of Financial Services 200 East Gaines Street Tallahassee, Florida 32399 (eServed) Barbara T. Hernandez East Coast Surgery Center 1871 LPGA Boulevard Daytona Beach, Florida 32117 (eServed) Thomas Nemecek, Esquire Department of Financial Services Division of Workers' Compensation 200 East Gaines Street Tallahassee, Florida 32399 (eServed) Julie Jones, CP, FRP, Agency Clerk Division of Legal Services Department of Financial Services 200 East Gaines Street Tallahassee, Florida 32399-0390 (eServed)

Florida Laws (2) 120.569440.13
# 5
LARRY E. SHIMKUS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD, 03-003543 (2003)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 26, 2003 Number: 03-003543 Latest Update: Sep. 15, 2005

The Issue The issues in each case are whether, pursuant to Sections 489.141 and 489.143, Florida Statutes (2003), a claimant is entitled to payment from the Construction Industries Recovery Fund, and, if so, whether, pursuant to Section 489.143(7), Florida Statutes (2003), Respondent may automatically suspend the residential contractor's license of Petitioner until Petitioner reimburses Respondent for the paid claim.

Findings Of Fact Petitioner is licensed as a certified residential contractor, holding license number CRC 013599. Respondent first issued a residential contractor's license to Petitioner in 1978, and Petitioner has been continually licensed since that time. Petitioner has never been disciplined by Respondent or any local governmental agency. On January 29, 2004, Respondent transmitted to the Division of Administrative Hearings seven files containing administrative complaints alleging disciplinary breaches against Petitioner for many of the transactions covered in the nine subject cases. These seven new cases have not yet been heard, and Respondent has not yet entered any restitution orders against Petitioner. In the past, Petitioner has placed his residential contractor's license with various corporations to qualify them to perform residential construction. In February 1999, Petitioner met with Lori Thomson, president of Thomson Homes, Inc., to discuss placing his license with her residential construction company. Now inactive, Thomson Homes, Inc., had been in the residential construction business since at least 1994, operating out of an office in Palm Beach County, which is also the location of all but one of the residential construction jobs that are the subject of these cases. Since 1994, Thomson Homes, Inc., had used the general contractor's license of Ms. Thomson's husband, Steven Thomson, to qualify to perform residential construction. During the time that his license qualified Thomson Homes, Inc., Mr. Thomson believed that he and his wife owned the corporation equally and that she served as the president and he served as the vice-president. In the summer of 1998, Mr. Thomson filed for divorce from Ms. Thomson. In February 1999, Ms. Thomson fired Mr. Thomson from Thomson Homes, Inc. Shortly thereafter, Mr. Thomson learned that Ms. Thomson had caused all of the stock to be issued to her when the corporation was formed, and that she had assumed all of the officer and director positions. In early March 1999, Mr. Thomson cancelled all of the building permits that he had obtained on behalf of Thomson Homes, Inc., and withdrew his general contractor's license from Ms. Thomson's corporation, effective March 20, 1999. When Mr. Thomson withdrew his license from Thomson Homes, Inc., it was in the process of building or preparing to build about ten homes. At no time during Petitioner's discussions with Ms. Thomson was he aware that Thomson Homes, Inc., was actively involved in construction. Eventually, Ms. Thomson and Petitioner agreed that Petitioner would place his residential contractor's license with Thomson Homes, Inc., and would supervise the corporation's construction activities. In return, Thomson Homes, Inc., would pay Petitioner $500 weekly and 35 percent of the profits. After filing the necessary documentation in April 1999, Petitioner qualified Thomson Homes, Inc. effective April 22 or 26, 1999. Petitioner advised Ms. Thomson that he had other work to do for another month, so he could not start with Thomson Homes, Inc. immediately. Ms. Thomson told him that she had to get financing arranged for several signed contracts and did not have any construction taking place at the time. The record is unclear whether this delay took place after the initial agreement between Petitioner and Ms. Thomson or after Petitioner formally placed his license with Thomson Homes, Inc. However, in either event, from the date that Petitioner formally placed his license with Thomson Homes, Inc., he never had a substantive conversation with Ms. Thomson about any construction activities of Thomson Homes, Inc. Not hearing from Ms. Thomson, Petitioner eventually called her to learn when he would start work. At first, Ms. Thomson took Petitioner's calls and kept explaining that the financing paperwork had been delayed. She promised to call Petitioner when construction was ready to proceed. However, Ms. Thomson never contacted Petitioner, and she later stopped taking or returning Petitioner's calls. In early August 1999, Petitioner called Thomson Homes, Inc., and learned that its telephone had been disconnected. He visited the office of Thomson Homes, Inc., but found it closed and the premises vacated. In fact, Thomson Homes, Inc., discontinued business on or about August 1, 1999. Between the date that Petitioner had qualified Thomson Homes and the point at which Thomson Homes ceased doing business, Thomson Homes, Inc., had entered into construction contracts, taken deposits and draws on construction loans, and performed residential construction--all unknown to Petitioner. Also unknown to Petitioner was the fact that Thomson Homes, Inc., had failed to perform its obligations under many, if not all, of its construction contracts during that period. The record is unclear when Petitioner withdrew his license from Thomson Homes, Inc. Petitioner sent Respondent a letter on August 30, 1999, advising of the withdrawal of his license from Thomson Homes, Inc. Later advised that he needed to file another form to effect the withdrawal, Petitioner did so in March 2000. The difference is not important in these cases. At no time did Petitioner receive any money from Thomson Homes, Inc., or any of the claimants who contracted with Thomson Homes, Inc. At no time did Petitioner enter into any contracts with any of the claimants. Only after Thomson Homes, Inc., had taken the claimants' money and abandoned work or failed to commence work did Petitioner learn that Thomson Homes, Inc., had done construction business under his license. DOAH Case No. 03-3540 involves the claim of Sandra Harvey. Ms. Harvey entered into a construction agreement with Thomson Homes, Inc., on September 9, 1998. Pursuant to the agreement, Ms. Harvey agreed to pay Thomson Homes, Inc., $25,500 for a lot and $115,260 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After pouring the slab, constructing the shell, and completing the rough plumbing, air conditioning, and electrical, Thomson Homes, Inc., stopped work on Ms. Harvey's home in early 1999. Ms. Harvey learned of the problem when Mr. Thomson called her in early 1999 and said that he could not finish the home because Ms. Thomson had taken over the business. This call probably took place no later than late March 1999, when Mr. Thomas withdrew as the qualifier for Thomson Homes, Inc. The record does not reveal the extent of payments from Ms. Harvey or her lender or the extent of completed work at the time that Thomson Homes, Inc., abandoned the job. Although the complaint is not part of this record, Ms. Harvey commenced a legal action against Thomson Homes, Inc., but not Petitioner. She obtained a default final summary judgment against Thomson Homes, Inc., on March 30, 2001, for a total sum of $46,267.32, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, services and material provided. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from the construction lender. On May 3, 2001, Ms. Harvey filed a claim with the Construction Industries Recovery Fund (Recovery Fund). In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Harvey answered "yes," explaining she had "filed lawsuit." Ms. Harvey probably filed her claim within two years of when Thomson Homes, Inc., abandoned her job. By the end of March 1999, Mr. Thomson informed Ms. Harvey that his wife had fired him, so he could not work on her home anymore. A change in qualifier does not mean that Thomson Homes, Inc., would necessarily abandon the job, but, as noted in the Conclusions of Law, abandonment presumptively arises upon the expiration of 90 days without work. No work took place on Ms. Harvey's home after Mr. Thomson withdrew as qualifier, so presumptive abandonment took place by the end of June 1999--after May 3, 1999, which is two years prior to the date on which Ms. Harvey filed her claim. By letter dated June 5, 2001, from James Brogan of WEI Consulting Group to Ms. Harvey, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in Bankruptcy Court in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home, but the furniture was no longer available. On February 28, 2003, Respondent issued an Order approving Ms. Harvey's claim of $25,000 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Harvey is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Harvey and Respondent, contests the payment to Ms. Harvey and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Harvey's claim because she had made insufficient efforts to satisfy the judgment; she had failed to submit all required exhibits with her claim; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Additionally, the petition contests the automatic suspension because the payment to Ms. Harvey is not authorized, her claim is incomplete, and her judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3541 involves the claim of John and Kathleen Whitesides. The Whitesides, who lived at the time in Juno Beach, Florida, entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, the Whitesides agreed to pay Thomson Homes, Inc., $154,094 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Whitesides paid Thomson Homes, Inc., $5000 and secured a construction loan, Thomson Homes, Inc., never commenced construction. In a complaint filed April 3, 2000, the Whitesides commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction. The Whitesides obtained a default final judgment against Thomson Homes, Inc., on December 21, 2000, for a total sum of $20,146.67, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: "Defendant is in breach of the Contract dated February 7, 1999, and has received unjust enrichment from Defendant's failure to fulfill the terms of the Contract to build a home for Plaintiffs." On August 9, 2001, David Tassell, the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., stated, in an acknowledged statement, that he had performed "numerous" real property searches in Palm Beach and Martin counties' public records and determined that Thomas Homes, Inc., "owns no real property in Martin County." The omission of Palm Beach County in the statement is unexplained. Mr. Tassell's statement adds that he has retained a private investigator, who confirmed that Thomson Homes, Inc., owns no boats, planes, or automobiles. On August 10, 2001, the Whitesides filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Whitesides answered "yes," but did not supply an explanation in the following blank. The completed questionnaire accompanying the claim states that the Whitesides discovered the violation in September 1999 and that it occurred in July to August 1999. On September 17, 2002, Respondent issued an Order approving the Whitesides' claim of $18,526.67 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Whitesides are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. The Whitesides probably filed their claim within two years of when they reasonably should have discovered that Thomson Homes, Inc., had wrongfully failed to commence construction, as is required for reasons set forth in the Conclusions of Law. As noted in the Conclusions of Law, presumptive abandonment arose when Thomson Homes, Inc., after entering the contract, performed no work for 90 days. Six months elapsed from the signing of the contract to the date that is two years prior to the filing of the claim. Although the record is not well-developed on the point, it is more likely than not that due diligence did not require that the Whitesides discover the abandonment within the first 90 days after it had presumptively arisen. The Whitesides' judgment is probably based on a violation of Section 489.129(1)(g), (j), or (k), Florida Statutes, as is required for reasons set forth in the Conclusions of Law. Although the record is not well-developed on this point either, it is more likely than not that the judgment is based on Thomson Homes' abandonment after entering into the contract. The judgment does not state this basis explicitly, but the complaint, on which the judgment is based, alleges abandonment. On December 23, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Whitesides' attorney in the circuit court action against Thomson Homes, Inc., contests the payment to the Whitesides and the automatic suspension of Petitioner's license. The petition contests the payment of the Whitesides' claim because they did not file certified copies of the final judgment and levy and execution documents and their judgment did not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; Petitioner received no notice of the hearing that resulted in the Order to pay the Whitesides and suspend Petitioner's license; the Whitesides' claim is incomplete; and the Whitesides' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3542 involves the claim of Richard and Kathleen Beltz. The Beltzes entered into a construction contract with Thomson Homes, Inc., on July 13, 1999. Pursuant to the agreement, the Beltzes agreed to pay Thomson Homes, Inc., $35,500 for a lot and $140,500 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After the Beltzes paid Thomson Homes, Inc., $17,283.70, Thomson Homes, Inc., never appeared at the closing, which had been scheduled for August 10, 1999. Nor did Thomson Homes, Inc., ever commence construction. The record does not disclose the extent, if any, to which Thomson Homes, Inc., completed construction. The Beltzes' discovery of Thomson Homes' failure to commence construction was hampered by the fact that they resided in California at the time. However, the Beltzes had obviously discovered the wrongful acts and omissions of Thomson Homes, Inc., by September 29, 1999, when they sent a letter to Petitioner demanding that he return the money that they had paid Thomson Homes, Inc. On October 19, 1999, the Beltzes signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. The completed questionnaire attached to the claim does not ask if the claimants had made a diligent effort to collect payment from the contractor. For reasons set forth in the Conclusions of Law, a claim must follow a judgment, so, the Beltzes could not file a valid claim until they had obtained a judgment. Two years from September 29, 1999, at which point the Beltzes obviously knew of a violation, requires that they file the claim, on an already- secured judgment, prior to September 29, 2001. In a complaint filed February 4, 2002, the Beltzes commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to any construction" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Beltzes obtained a default final summary judgment against Thomson Homes, Inc., on May 22, 2002, for a total sum of $23,280.20, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed some work on the project. However, Defendant breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay Lienors who provided labor, service and materials to Plaintiffs [sic] real property, Construction Liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay Lienors, the misapplication of construction funds and financial mismanagement, Plaintiffs were forced to borrow additional funds from their construction lender. By unacknowledged statement dated August 23, 2002, Ms. Beltz declared that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Ms. Beltz stated that she searched the database of the "Department of Motor Vehicles in Palm Beach County" in May 2000 and found no vehicles or boats registered to Thomson Homes, Inc. Lastly, she reported that she contacted the "Federal Aviation Association" at an unspecified time and found no "airplanes" registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the Beltzes' claim of $17,222.78 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Beltzes are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Beltzes and Respondent, contests the payment to the Beltzes and the automatic suspension of Petitioner's license. The petition contests the payment of the Beltzes' claim because they did not submit all of the necessary exhibits with their claim; their judgment is against Thomson Homes, Inc., and not Petitioner; and their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes. Additionally, the petition contests the automatic suspension because Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes; the Beltzes' claim is incomplete; and the Beltzes' judgment is not against Petitioner. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3543 involves the claim of Keith and Karen Deyo. The Deyos entered into a construction contract with Thomson Homes, Inc., on October 31, 1998. Pursuant to the agreement, the Deyos agreed to pay Thomson Homes, Inc., $25,500 for a lot and $123,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Although the Deyos clearly suffered damages from the acts and omissions of Thomson Homes, Inc., the record does not disclose how much they paid the company, how much they had to pay unpaid suppliers and laborers, and how much construction the company completed before abandoning the job. Thomson Homes, Inc., began construction on the Deyos' home about 30-45 days after the parties signed the contract, but all work stopped in July 1999. In an undated complaint, the Deyos commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment] of the project prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Deyos obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $55,458.64, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant partially performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and material provided. As a result of Defendant failing to pay lienors who provided labor, services and materials to Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs had to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 27, 2000, the Deyos signed a claim under the Recovery Fund, but the record contains no indication when the claim was filed. A cover letter dated May 8, 2000, suggests that the Deyos mailed their claim a couple of weeks after signing it, so it was probably filed in mid-May 2000, although their questionnaire bears a revision date of November 2001, which would be beyond two years after the violation. In the questionnaire, the Deyos did not respond to the question asking if they had made a diligent effort to collect payment from the contractor. By an undated and unacknowledged statement, Mr. Deyo declared that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that he had found on the internet two pieces of real property owned by Thomson Homes, Inc., but they had been transferred within the past year. Mr. Deyo stated that he searched the database of the "department of motor vehicles in Palm Beach County" in on April 14, 2000, and found no motor vehicles or boats registered to Thomson Homes, Inc. Lastly, he reported that he contacted the "Federal Aviation Association" on April 21, 2000, and found no "airplanes" registered to Thomson Homes, Inc. On January 22, 2003, Respondent issued an Order acknowledging the Deyos' claim of $55,458.64, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Mr. Deyo is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On February 3, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Respondent and the Deyos' attorney who represented them in the action against Thomson Homes, Inc., contests the payment to the Deyos and the automatic suspension of Petitioner's license. The petition contests the payment of the Deyos' claim and suspension of Petitioner's license because Petitioner did not receive notice of the hearing at which Respondent entered the Order; the Deyos did not satisfy all requirements for payment from the Recovery Fund; their claim was not accompanied by certified copies of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3544 involves the claim of Sylvia Reinhardt. Ms. Reinhardt entered into a construction contract with Thomson Homes, Inc., on October 14, 1998. Pursuant to the agreement, Ms. Reinhardt agreed to pay Thomson Homes, Inc., $45,000 for a lot and $147,150 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. After Ms. Reinhardt paid Thomson Homes, Inc., $144,769, directly and indirectly, by way of her construction lender, the house was little more than half complete when Thomson Homes, Inc., abandoned the job. Thomson Homes also failed to pay various suppliers that filed liens, so Ms. Reinhardt had to pay $8550.41 to RTS Roofing, $882 to Palm Beach Garage Door, and $3421.32 to Woodworks, Inc. In an undated complaint filed in 1999 (actual date illegible), Ms. Reinhardt commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Reinhardt obtained a final summary judgment against Thomson Homes, Inc., on March 28, 2000, for a total sum of $61,471.15, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant performed work under the Contract. However, it breached its contract by accepting deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and materialmen for their labor, services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff had to satisfy. As a result of Defendant abandoning the project, Plaintiff was compelled to retain a new contractor to complete their [sic] home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff has been forced to borrow additional funds from her construction lender. On April 17, 2000, Ms. Reinhardt filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Reinhardt answered "yes" and explained: "Telephone calls were unanswered. Certified mail requesting response were [sic] never answered. Our attorney made written and personal contact with the owner and there was no intention to pay." The claim states that the violation took place in July 1999. By acknowledged statement dated July 21, 2000, Ms. Reinhardt declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Reinhardt stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared that she had found one parcel of property owned by Thomson Homes, Inc., and valued at $115,387, but this had been sold to "Joan Thomson" on February 1, 2000. Ms. Reinhardt stated that she had found tangible personal property worth $5000. She added that she had not found any motor vehicles registered with the Department of Highway Safety and Motor Vehicles, nor had she found anything registered with the "FAA." On November 26, 2002, Respondent issued an Order acknowledging Ms. Reinhardt's claim of $58,661.44, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Reinhardt is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 24, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Reinhardt and Respondent, contests the payment to Ms. Reinhardt and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Reinhardt's claim and suspension of Petitioner's license because Ms. Reinhardt did not submit certified copies of the levy and execution documents; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3545 involves the claim of Louis and Ann Mahoney. The Mahoneys entered into a construction contract with Thomson Homes, Inc., on June 28, 1999, for the construction of a home in Martin County. Pursuant to the agreement, the Mahoneys agreed to pay Thomson Homes, Inc., $32,000 for a lot and $149,000 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the Mahoneys paid Thomson Homes, Inc., $14,500, directly and indirectly, by way of their construction lender, they suffered damages due to the acts and omissions of Thomson Homes, Inc., although, again, the record does not describe specifically how Thomson Homes caused them damage. In an undated complaint that bears no filing date, the Mahoneys commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Mahoneys obtained a final summary judgment against Thomson Homes, Inc., on April 13, 2000, for a total sum of $43,084.49, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, Defendant breached its contract by accepting Plaintiffs' deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor, and/or services provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and materials for the construction of Plaintiffs [sic] residence, a construction lien was recorded against Plaintiffs' property, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 30, 2000, the Mahoneys signed a claim under the Recovery Fund. Although the claim form bears no filing date, the completed questionnaire attached to the claim was filed on May 3, 2000, so that is the likely filing date of the claim. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Mahoneys answered "yes" and explained: "This is explained in General Allegations, enclosed with this paperwork." Evidently, the reference is to a copy of the circuit court complaint. By acknowledged statement dated April 8, 2002, Mr. Mahoney declared that he had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy his judgment. Mr. Mahoney stated that someone at the Florida Department of State advised him that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. He also declared that an internet search had disclosed no property owned by Thomson Homes, Inc. Mr. Mahoney stated that the "department of motor vehicles in Palm Beach County" found no motor vehicles or boats registered to Thomson Homes, Inc., and that the "FAA" had found nothing registered to Thomson Homes, Inc. On February 28, 2003, Respondent issued an Order acknowledging the Mahoneys' claim of $38,185, approving the payment of the statutory limit of $25,000 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Mr. Mahoney is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Mahoneys and Respondent, contests the payment to the Mahoneys and the automatic suspension of Petitioner's license. The petition contests the payment of the Mahoneys' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3546 involves the claim of Dennis and Carolyn DeStefanis. The DeStefanises entered into a construction contract with Thomson Homes, Inc., on April 7, 1999. Pursuant to the agreement, the DeStefanises agreed to pay Thomson Homes, Inc., $137,455 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 150 days from the date of slab pour. After the DeStefanises paid Thomson Homes, Inc., $15,765, directly and indirectly, by way of their construction lender, Thomson Homes, Inc. never did any work, except to contract with a surveyor, who, unpaid, filed a claim of lien against the DeStefanises's lot. In an undated complaint bearing no filing date, the DeStefanises commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The DeStefanises obtained a final summary judgment against Thomson Homes, Inc., on March 15, 2000, for a total sum of $36,701.87, including attorneys' fees and costs. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant, [sic] breached its contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project. [sic] As a result of Defendant abandoning the project, Plaintiffs were compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, the misapplication of construction funds and financial mismanagement Plaintiffs have been forced to borrow additional funds from their construction lender. On April 19, 2000, the DeStefanises filed a claim with the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the DeStefanises answered "yes" and explained: "Went to DBPR Investigative Services, hired Attorney Barry W. Taylor [attorney in circuit court action], got Final Summary Judgment against Thomson Homes, Inc." On March 20, 2003, Respondent issued an Order acknowledging the DeStefanises' claim of $34,965.52, approving the payment of $15,765 against the Recovery Fund, and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the DeStefanises are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On April 7, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the DeStefanises and Respondent, contests the payment to the DeStefanises and the automatic suspension of Petitioner's license. The petition contests the payment of the DeStefanises' claim and suspension of Petitioner's license because they did not submit all of the required exhibits; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. The petition contests the suspension of Petitioner's license on the additional ground that he was not the qualifier for Thomson Homes, Inc., when it and the DeStefanises entered into the construction contract. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3547 involves the claim of James and Donna Barr. The Barrs entered into a construction contract with Thomson Homes, Inc., on September 12, 1998. Pursuant to the agreement, the Barrs agreed to pay Thomson Homes, Inc., $30,000 for a lot and $140,900 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. The Barrs paid Thomson Homes, Inc., $8500 in the form of a down payment. They or their construction lender paid Thomson Homes, Inc., considerably more money and suffered the imposition of claims of lien by unpaid subcontractors and suppliers, but, after negotiating with the bank, emerged from the transaction having lost only the $8500 down payment. Thomson Homes, Inc., obtained permits in April 1999 and started construction in May 1999. Before abandoning the job, Thomson Homes, Inc., worked on the home in May, June, and July of 1999. The Barrs and their lender did not make additional payments after the Barrs found the Thomson Homes, Inc., office empty on August 1, 1999. In a complaint filed October 6, 1999, the Barrs commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiffs [sic] residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. The Barrs obtained a final summary judgment against Thomson Homes, Inc., on May 8, 2000, for a total sum of $45,435.62, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering into the above referenced contract, partially performed work under the Contract. However, Defendant breached the contract by accepting Plaintiffs [sic] deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienors who provided labor, services and materials for the construction of Plaintiffs [sic] residence, construction liens were recorded against same, which Plaintiffs will have to satisfy. As a result of Defendant abandoning the project, Plaintiffs will be compelled to retain a new contractor to complete their home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienors, the misapplication of construction funds and financial mismanagement Plaintiffs will be forced to borrow additional funds from their construction lender. On June 2, 2000, the Barrs filed a claim under the Recovery Fund. In response to a question asking if they had made a diligent effort to collect payment from the contractor, the Barrs answered "yes" and explained: "I have looked into the assets of Thomson Homes Inc. and they do not have any. My affidavit is attached." The completed questionnaire states that the Barrs discovered the violation on August 11, 1999. They therefore failed to file their claim within two years of the discovery of the violation. By acknowledged statement dated May 23, 2000, Ms. Barr declared that she had completed a "reasonable search and inquiry" and had not found any property or assets against which to satisfy her judgment. Ms. Barr stated that someone at the Florida Department of State advised her that Thomson Homes, Inc., was administratively dissolved on September 24, 1999. She also declared she had found no property owned by Thomson Homes, Inc., in Palm Beach County. Ms. Barr stated that the Department of Highway Safety and Motor Vehicles found no motor vehicles or boats registered to Thomson Homes, Inc., and that the internet site of the "FAA" had revealed nothing registered to Thomson Homes, Inc. On November 26, 2002, Respondent issued an Order approving the payment of the Barrs' claim of $8500 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that the Barrs are the Petitioners, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On December 27, 2002, Petitioner served a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on the Barrs and Respondent, contests the payment to the Barrs and the automatic suspension of Petitioner's license. The petition contests the payment of the Barrs' claim and suspension of Petitioner's license because they did not submit a certified copy of the levy and execution documents; their judgment is against Thomson Homes, Inc., and not Petitioner; their judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. DOAH Case No. 03-3633 involves the Joanne Myers. Ms. Myers entered into a construction contract with Thomson Homes, Inc., on February 7, 1999. Pursuant to the agreement, Ms. Myers agreed to pay Thomson Homes, Inc., $29,500 for a lot and $125,400 for a home, which Thomson Homes, Inc., agreed to construct to "substantial completion" within 120 days from the date of slab pour. Ms. Myers directly or indirectly paid Thomson Homes, Inc., $12,840. According to Ms. Myers' claim, Thomson Homes, Inc., never commenced construction before going out of business in August 1999. In an undated complaint bearing no filing date, Ms. Myers commenced a legal action against Thomson Homes, Inc., but not Petitioner. The two-count complaint alleges a breach of contract, based on Thomson Homes' alleged "abandon[ment]" of the job "prior to completion" and "fail[ure] and refus[al] to pay subcontractors and/or materialmen which resulted in Claims of Liens against Plaintiff's residence, which Defendant has failed and refused to satisfy," and unjust enrichment, based on Thomson Homes' alleged receipt of funds and failure to complete construction and pay for goods and services provided by subcontractors and materialmen. Ms. Myers obtained a final summary judgment against Thomson Homes, Inc., on May 31, 2000, for a total sum of $28,307.77, including attorneys' fees, costs, and prejudgment interest. The judgment states, in part: Subsequent to entering . . . into the above referenced contract, Defendant breached the contract by accepting Plaintiff's deposits and construction loan disbursements and thereafter abandoning the project and failing to pay subcontractors and/or materialmen for their labor services and materials provided. As a result of Defendant failing to pay lienor's [sic] who provided labor, services and/or materials for the construction of Plaintiff's residence, construction liens were recorded against same, which Plaintiff will have to satisfy. As a result of Defendant abandoning the project, Plaintiff will be compelled to retain a new contractor to complete her home at an additional cost over and above the original contract amount. As a direct result of Defendant abandoning the project, failing to pay lienor's [sic], the misapplication of construction funds and financial mismanagement Plaintiff will be forced to borrow additional funds from her construction lender. On September 18, 2000, Ms. Myers filed a claim with the Recovery Fund. In response to a question asking if she had made a diligent effort to collect payment from the contractor, Ms. Myers answered "yes" and explained: "Contractor closed corporate office--would not answer telephone calls." By letter dated November 30, 2000, from James Brogan of WEI Consulting Group to Ms. Myers, Mr. Brogan states that he had investigated the assets of Thomson Homes, Inc. Mr. Brogan found no bankruptcy filing by Thomson Homes, Inc., in the Southern District of Florida. Thomson Homes, Inc., was a party to 282 legal actions and owed tangible personal property taxes on furniture in a model home. On February 28, 2003, Respondent issued an Order approving the payment of Ms. Myers' claim of $14,080.66 against the Recovery Fund and automatically suspending Petitioner's license until he reimburses the Recovery Fund for the full amount of the paid claim. The Order, copies of which were served on all parties, states that Ms. Myers is the Petitioner, the Recovery Fund is a Respondent, and "Larry Shimkus, d/b/a Thomson Homes, Inc.," is a Respondent. The Order advises that "you" may seek a formal hearing, pursuant to Section 120.57(1), Florida Statutes, if material facts are in dispute. On March 17, 2003, Petitioner filed a Petition for Section 120.57 Formal Administrative Hearing. The petition, which was served on Ms. Myers and Respondent, contests the payment to Ms. Myers and the automatic suspension of Petitioner's license. The petition contests the payment of Ms. Myers' claim and suspension of Petitioner's license because she did not submit evidence of a diligent search for assets; she did not submit all of the required exhibits; her judgment is against Thomson Homes, Inc., and not Petitioner; her judgment does not find that Petitioner violated Section 489.129(1)(g), (j), or (k), Florida Statutes; and Ms. Thomson deceived Petitioner in violation of Section 489.132, Florida Statutes. Lastly, the petition seeks attorneys' fees under Section 57.111, Florida Statutes. On January 4, 2004, Ms. Myers died. However, the probate court of Lancaster County, Pennsylvania, issued letters testamentary on her estate to James W. Myers III, in whose name Ms. Myers' claim is now being prosecuted. At the hearing, Petitioner contended that most, if not all, of the claims failed because the claimants had not exercised reasonable diligence in searching for assets, although Petitioner has dropped this contention in its proposed recommended order. In his petitions for hearing, Petitioner raised this contention only as to Ms. Myers. Ms. Myers, as well as the remainder of the claimants, made or caused to be made a reasonable search and inquiry for the assets of Thomson Homes, Inc. It is obvious that Thomson Homes, Inc., had no assets by the first letter from Mr. Brogan, dated November 30, 2000, nor did it have assets when Mr. Brogan issued his later letter on June 5, 2001, or when the attorney issued his affidavit on August 9, 2001. What is reasonable, in terms of a search, is dictated here by the fact that Thomson Homes, Inc., had no discoverable assets against which it could be made to answer for the considerable fraud that it perpetrated against these nine claimants. Respondent provided all of the parties, including Petitioner, with notice of its hearings at which it entered Recovery Fund orders. The petitions contend that Petitioner received no such notice in the Whitesides and Deyos cases. Although not litigated at the hearing, the presumption of notice, pursuant to the recitations set forth in each of Respondent's orders, results in a finding that Petitioner received timely notice in all cases.

Recommendation It is RECOMMENDED that Respondent enter a final order dismissing the claims against the Recovery Fund of the Beltzes and Barrs; paying the claims against the Recovery Fund of the remaining claimants, pursuant to the provisions of the orders of Respondent already issued in these cases and pursuant to the provisions of Section 489.143(1)-(6), Florida Statutes; and dismissing Respondent's request for the automatic suspension of Petitioner's license, pursuant to Section 489.143(7), Florida Statutes, without prejudice to any separate disciplinary proceedings that Respondent has commenced or may commence against Petitioner or others for the acts and omissions involved in these nine cases. DONE AND ENTERED this 17th day of February, 2004, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 2004. COPIES FURNISHED: Bruce G. Kaleita Law Office of Bruce G. Kaleita, P.A. 1615 Forum Place, Suite 500 West Palm Beach, Florida 33401 Adrienne C. Rodgers Assistant General Counsel Department of Business and Professional Regulation 1940 North Monroe Street, Suite 60 Tallahassee, Florida 32399-1023 Tim Vaccaro, Director Construction Industry Licensing Board Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Nancy Campiglia, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (10) 120.569120.57468.631489.1195489.129489.132489.140489.141489.14357.111
# 6
CREATIVE DESIGNS AND INTERIORS, INC. vs. DEPARTMENT OF TRANSPORTATION, 89-000894F (1989)
Division of Administrative Hearings, Florida Number: 89-000894F Latest Update: May 18, 1989

Findings Of Fact Petitioner is a small business party within the meaning of Subsection 57.111(3)(d), Florida Statutes (1987). Petitioner was required to relocate its business in 1986 as the result of a public taking of the property where the business was situated. Petitioner sought relocation benefits from Respondent's relocation assistance program. The program is operated by Respondent in accordance with authority contained in Sections 339.09(4) and 421.55(3), Florida Statutes. Various requests by Petitioner for payment of relocation benefits in accordance with the Uniform Relocation Act were denied by Respondent. In DOAH Case No. 88-0778T, Petitioner sought a formal administrative hearing pursuant to Section 120.57, Florida Statutes concerning Respondent's denial of the requested reimbursements. At the final hearing in DOAH Case No. 88-0778T, evidence was presented regarding Respondent's denial of benefit payments of $1,324 for advertisement expense in a telephone directory; $1,370 for installation of an exhaust fan at the new facility; $2,405 for fees for consultative services from an attorney; $1,200 for the alleged loss of employee time spent in conferences with Respondent personnel regarding relocation; $1,500 for expense of a second search for a suitable relocation site; and $1,035 for consultation fees associated with design of a product display area in the new facility. With the exception of Respondent's denial of the claim for $1,035 for consultant fees, Respondent's denials were found to be appropriate in DOAH Case No. 88-0778T. Such a finding of appropriateness also equates to a finding of substantial justification for denial for purposes of this proceeding. A recommended order was issued in DOAH Case No. 88-0778T, finding denials of all requested reimbursements to be appropriate with the exception of Respondent's denial of the request for $1,035 for consultation fees associated with design of a product display area. Payment of this latter amount was recommended as constituting an authorized reimbursement under legal provisions governing the relocation program. On December 26, 1988, Respondent entered a final order awarding Petitioner $1,035 for this consultation fee expense. Other claims for reimbursement by Petitioner in the amount of $10,414.17 were paid by Respondent, prior to the final hearing in DOAH Case No. 88-0778T, in the course of proceedings in the Circuit Court for Broward County, Florida. That court adopted a settlement stipulation of the parties regarding those claims which expressly reserved attorney fees in regard to those issues for later determination by that court. Petitioner presented no evidence with regard to those claims at the final hearing in DOAH Case No. 88-0778T. At the final hearing in the present proceeding, Respondent offered testimony that confusion concerning payment of those claims resulted from the death of the attorney handling the case for Respondent. Respondent initially denied the claims in the absence of the deceased attorney's records in the mistaken belief that the matter had been resolved earlier in the circuit court condemnation proceeding. Upon learning such was not the case, payment of the claim and effectuation of settlement of the issue was made in the circuit court case and occurred shortly after Petitioner's request for hearing in DOAH Case No. 88- 0778T. The circumstances surrounding the initial denial of payment of this benefit by Respondent substantially justify Respondent's denial and constitute a sufficient basis to deny Petitioner's recovery of fees or costs related to this payment recovery in this administrative proceeding. The proof submitted at the final hearing in this cause establishes that Petitioner's counsel expended between 55 and 70 hours of time in his representation of Petitioner's attempts to recover all denied benefits in DOAH Case No. 88-0778T. Counsel's average hourly rate was $125. However, the fee arrangement between client and counsel was a "modified or combined contingency fee" permitting any recoverable attorney fees to serve as the primary source of payment of counsel's fees. Petitioner was not bound by the agreement to pay counsel's fees beyond amounts determined to be appropriate by the hearing officer in the administrative case or the judge in the circuit court matter. To that extent, attorney fees in this cause that have been incurred by Petitioner may be considered "contingent." Documentation submitted by Petitioner includes an affidavit from its president which simply recites the status of Petitioner as a small business party, but sets forth no specifics of a fee arrangement with counsel. The affidavit of Petitioner's counsel establishes a minimum number of hours (55) and dates of work performed by counsel, and states that his hourly rate is $125. Calculating the number of hours by the hourly rate, one reaches a total fee amount of $6,875. Counsel's affidavit does not address which of the various benefits sought to be recovered was the subject of any particular expenditure of time. Although the relocation benefits sought to be recovered were separable subjects, allocation of time expended with regard to a particular benefit recovery effort is not established by the evidence. Testimony of William Robert Leonard was also offered by Petitioner to support the reasonableness of a legal fee amount of $10,000 for Petitioner's counsel. While Mr. Leonard opined that he normally would not support a $10,000 attorney fee as reasonable for a $1,000 recovery, the circumstances of this case were different because "[y]ou are arguing with the state." Petitioner attempted to establish through further testimony of Leonard that the enormity of the resources of the government of the State of Florida justify such a fee because cost considerations prevent private litigants from engaging in costly and protracted proceedings in matters of limited recovery. Leonard did not address allocation of the requested attorney fee among the various benefits for which recovery was sought, choosing instead to premise his opinion regarding reasonableness of a $10,000 attorney fee upon "the amount of time counsel was required to respond to a state agency." Leonard's testimony is not credited with regard to reasonableness of a $10,000 fee for recovery of the $1,035 relocation benefit due to his professed lack of knowledge of certain administrative law procedures; the failure of his testimony to address the nature or difficulty of tasks performed by counsel for Petitioner; and his concurrence with the assertion that his opinion of such a fee was based in part upon a "gut reaction." No evidence was submitted to support the reasonableness of the cost amount of $250 requested as a witness fee for Mr. Leonard's participation in the proceeding. Petitioner seeks recovery of $448.50 in costs associated with the transcript of final hearing had in DOAH Case No. 88-0778T and a $480 expert witness fee in conjunction with testimony of E. Scott Golden, an attorney, at that final hearing. The testimony of Mr. Golden in that proceeding related to his provision of relocation site advice to Petitioner and drafting of legal documents for Petitioner. Petitioner did not prevail with regard to recovery of relocation benefits related to the expense of Mr. Golden's services.

Florida Laws (6) 120.57120.68339.09414.17421.5557.111
# 7
FLORISTS MUTUAL INSURANCE COMPANY vs DEPARTMENT OF FINANCIAL SERVICES, DIVISION OF WORKERS' COMPENSATION, 13-002940 (2013)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Aug. 06, 2013 Number: 13-002940 Latest Update: Sep. 30, 2013

The Issue The issue to be determined is whether the doctrine of equitable tolling should excuse the late filing of a Petition for Administrative Hearing filed with Respondent by Petitioner Florists Mutual Insurance Company.

Findings Of Fact Respondent, the Department, is the state agency charged with resolving disputes over reimbursement for costs of medical services provided to injured workers under workers? compensation law. Petitioner Florists was in a reimbursement dispute with Kendall. The Department issued a Determination that Florists should reimburse Kendall the sum of $100,894.54. Florists received notice of the Reimbursement Dispute Determination on April 8, 2013, via United States Postal Service certified mail. The Reimbursement Dispute Determination included a Notice of Rights advising Florists that a request for an administrative hearing on the Determination had to be received by the Department within 21 days of Florists? receipt of the Determination. It noted in bold print that failure to file a petition within that time period constituted waiver of the right to a hearing. Florists? Initial Petition was sent via certified mail from the Tallahassee office of Petitioner?s counsel located at 1701 Hermitage Boulevard, Suite 103, Tallahassee, Florida, on or about Thursday, April 25, 2013. The filing deadline was the following Monday. The Initial Petition was appropriately addressed to “Julie Jones, CP, FRP, DFS Agency Clerk, Department of Financial Services, 612 Larson Building, 200 East Gaines Street, Tallahassee, Florida.” The Initial Petition was received by the Department on Wednesday, May 1, 2013, at 10:11 a.m. The Department determined that the Initial Petition was untimely, as it was received on the twenty-third day after Florists received notice, making it two days late. Petitioner is a workers? compensation insurance carrier whose substantial interests are affected by Respondent?s Reimbursement Dispute Determination that it must reimburse health care provider Kendall $100,894.54. That determination will become final if Petitioner is determined to have waived its right to a hearing. The distance between the Tallahassee office of Petitioner?s counsel and the office of the Department is approximately four miles. From review of the United States Postal Service tracking information, it appears that after the Initial Petition was mailed, it was processed in Louisville, Kentucky, before it returned to Tallahassee, Florida, for delivery, indicating a journey of some 1,050 miles over the course of six days. Late delivery of the Petition by the United States Postal Service did not prevent Florists from asserting its rights.

Florida Laws (6) 10.11120.569120.57120.574120.68440.13
# 9