Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
JACK G. NICHOLS vs. DEPARTMENT OF NATURAL RESOURCES, 84-002945 (1984)
Division of Administrative Hearings, Florida Number: 84-002945 Latest Update: Sep. 25, 1985

Findings Of Fact The Petitioner, Dr. Jack G. Nichols, is a resident of the State of Illinois. He and his parents have, for many years, owned property on Dog island, a barrier island in Franklin County, Florida. Dr. Nichols owns Lots 107 and 108 on Dog Island, and has for many years entertained plans of building a beach house on each lot, consisting of a single-family residence for himself on Lot 108 and such a house on Lot 107 for his parents. Dr. Nichols has the habit of visiting Dog island to inspect his property on his vacations and has done so from time to time prior to April, 1984. Over the years he conceived of the general type of house he wished to build and determined prior to April, 1984 to locate the houses landward of the then-existing Coastal Construction Control Line. Pursuant to Chapter 161, Florida Statutes, the Department of Natural Resources undertook to survey and delineate a new Coastal Construction Control Line for Franklin County. The location of that line is described in Rule 16B- 26.14, F.A.C. and the new jurisdictional line became effective on April 30, 1984. Dr. Nichols came to Dog Island for his vacation in April, 1984, at which time he learned for the first time that the Department of Natural Resources had adopted the new Coastal Construction Control Line. After hearing of this new jurisdictional boundary from other property owners on the island, he sought to determine how that newly-defined boundary would affect his property and his plans for constructing a beach house. He observed aerial photographs depicting the Coastal Construction Control Line which would take effect April 30, 1984. He determined that the sites he had selected for the houses on his lots would be seaward of the new control line, as opposed to the preexisting line which he had taken into account in selecting his original home site. He also learned that if the houses he envisioned were under construction upon the effective date of the new Coastal Construction Control Line then he would be able to proceed with their construction without having to obtain a permit from the Department of Natural Resources. The Petitioner had not originally intended to construct the houses on his lots as early as April, 1984, but he became concerned that if he did not commence construction prior to the effective date of the new control line, he would not be able to place the houses at the location he had previously planned for. Thus, he took steps to retain a contractor and commence construction immediately. The Petitioner contacted Mr. William A. Shults, a contractor with experience building in the coastal areas of Franklin County. Mr. Shults was available and able to undertake construction activities and the two parties entered into a contract calling for construction of a beach house for both lots on approximately April 20, 1984. Mr. Shults immediately had necessary engineering work accomplished, had plans drafted for the structures and retained a construction crew. He cleared sufficient area on both lots to accommodate the residences and thereafter, on April 26, obtained a building permit for the structures. Materials were delivered to the island by landing craft on April 26 and 27, 1984. Mr. Shults also had a truck equipped with an auger or drilling equipment transported to the island and placed on the job site on or before April 27, 1984. The plans called for construction of the houses with a piling or pole foundation, so that the houses would be constructed above the specified flood levels. The poles and other materials necessary for construction of the foundation had all been delivered by April 27, 1984. The foundation lines were marked, the corner "batter boards" placed and other minor site preparation accomplished. The holes for the piling were to have been drilled on Saturday, April 28 but the trucks with the auger machine aboard, suffered a broken axle prior to its being positioned on Dr. Nichols' lots so that it was impossible to get the auger machine to the lots on April 28 or 29. Mr. Shults and his crew attempted to pull the truck to the site, but the difficulty of the terrain rendered that impossible. There was one other piece of auger equipment on the island, but its owner was engaged in construction activity with it at the time. That person agreed to bring his machine to the site on April 29 and begin augering and placing the poles for the pilings. His work became behind schedule however, and his machine was still involved in construction activity at his own site and could not be brought to Petitioner's site on that day. Mr. Shults, upon learning that the augering machine would not be available when needed, began commencing hand-digging of the pilings with post hole diggers on April 29. This method was a slow and laborious process because the holes had to be excavated much deeper than the length of the post-hole diggers. As a result, when the hole was dug as deep as the post-hole digger could reach from the surface of the ground, a hole had to be dug alongside the piling foundation hole so that a crew member could stand down in that hole and thus dig the piling hole deeper, handing the post-hole diggers with each load of dirt up to another crew member on the surface to dump, who would then hand the post-hole diggers back to the lower-placed crew member. This made the process of digging the foundation piling holes much slower than the use of the auger equipment. In this manner, however, Shults succeeded in digging four foundation holes on Lot 105. At that point, the augering machine arrived on the site and four piling holes were dug and the pertinent poles placed in them on Lot 107 as well. Throughout this construction process, Mr. Shults' crew was working on both foundations at one time. This allowed for less costly construction due to the efficiency of undertaking the same kind of work on two structures with the same crew at the same time. Since the two lots and construction sites adjoined each other, one crew could efficiently be used for both construction sites in an economic fashion. On April 30, Shults' construction crew proceeded to work on the structure on Lot 108 to further secure and place foundation posts. The four pilings placed in the holes on Lot 107 the day before remained in place. The construction crew and most of its equipment, and most construction work, was proceeding on Lot 108 merely because of the order of Mr. Shults to his crew to finish placing the foundation posts on that lot first, on that day. During the morning of that day, representatives of the Department arrived on the site and advised Mr. Shults that the construction activities appeared to be illegal and seaward of the Coastal Construction Control Line. They advised him that any further activity of that type would be undertaken at his and the lot owner's risk and expense. Mr. Shults thus ceased activities on both lots for a time, but during the following week, after discussing the dispute with certain Department employees, arrived at the opinion that the owner's construction activities had achieved grandfather status and that no permit from the Department would be required. He thus undertook to finish placing the foundation pilings on both lots. All the foundation pilings were installed on both lots by the end of the second week of May, 1984. Mr. Shults then contacted Dr. Nichols by telephone in Illinois informing him about the progress of the job, including the height of the piling. During this conversation Dr. Nichols became concerned that the pilings on Lot 107 did not project above the surface of the ground as far as he had anticipated, thus obstructing his view of the Gulf of Mexico from the beach house which would be constructed on top of the pilings. The view would be obstructed by the existing sand dune which Dr. Nichols had not wanted to disturb, hence locating his house in the more landward position at issue. In order to provide the desired view of the Gulf over the intervening sand dune, Dr. Nichols instructed Mr. Shults to replace the existing pilings on Lot 107 with longer ones. Mr. Shults purchased new pilings, had them delivered to the site, removed the original poles and installed the new ones in their place in the same holes, including the four holes that were dug prior to the effective date of the Coastal Construction Control Line. Dr. Nichols and Mr. Shults established that the original poles had been placed with the intention that they would be the permanent foundation for the house and no decision was contemplated nor made concerning their removal and replacement with the longer poles until after the foundation was fully constructed. In any event, by its letter of May 21, 1984, advising Dr. Nichols of the alleged violation of the Coastal Construction Control Line, the Department made a "free-form" determination that the construction activities on Lot 107 before April 30, 1984, were not sufficient to confer "grandfathered" status and that the activities were illegal unless a permit was obtained. The subject petition was filed and this proceeding ensued. It is true that Dr. Nichols' original intent was not to commence construction of the beach houses as soon as he did in April, 1984 and that he only began construction at that earlier time when he learned of the impending effective date of the new Coastal Construction Control Line which would require him to obtain a permit before constructing the houses at the sites he had previously selected. However, it is equally true that Dr. Nichols' bona fide intention when he retained Mr. Shults to commence construction was to not merely clear the site and place pilings and then construct the houses at some indefinite later time, but rather to commence construction and pursue construction activities on an ongoing, uninterrupted basis through to completion of both houses on both lots. If the Department had not intervened with its letter to the effect that the Petitioner might be in violation of the Coastal Construction Control Line, construction activities on Lot 107 would have continued to completion in an uninterrupted fashion. Prior to the effective date of the Department's Coastal Construction Control Line, the Petitioner's construction activity, involving the excavation for and placing of the foundation pilings for the residence to be on Lot 107, was undertaken and engaged in a continuous, uninterrupted fashion. The decision to remove the original pilings and replace them with longer poles was not envisioned, intended or made prior to the completion of the entire pole foundation for the house on Lot 107 in the first or second week of May. It was only at this time, when the poles were all installed, that it was determined by the owner and Mr. Shults that the original pilings were not long enough to confer a sufficient view of the Gulf from the house to be constructed on top of them. Thus, the removal of the original pilings and the replacement of them with longer poles in the same holes the original pilings had been installed in, was not an interruption in the construction activities, but was rather the correction of a deficiency in the original materials. This replacement did not involve an alteration or modification of the design, extent and type of materials of the original foundation (except to the immaterial extent that the replacement poles were round instead of square). In short, the construction activity undertaken after April 20, 1984 was a good faith effort to commence construction on the house on Lot 107 and continue it to completion in an uninterrupted fashion. The parties, Dr. Nichols and Mr. Shults, intended from the beginning to use the poles first placed in that foundation as the ultimate foundation for the structure, and did not intend merely placing those original poles, which were later removed, as a subterfuge to obtain a grandfathered status for the construction activity. The construction was landward of the Coastal Construction Control Line as it existed prior to April 30, 1984.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the Department of Natural Resources enter a Final Order determining that the structure on Lot 107, Dog Island, Franklin County, Florida is not in violation of the Department of Natural Resources permitting authority. DONE and ENTERED this 25th day of September, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1985.

Florida Laws (3) 120.57161.052161.053
# 1
AMERICAN COASTAL ENGINEERING, INC., ON BEHALF OF WILLIS H. DUPONT vs DEPARTMENT OF NATURAL RESOURCES, 91-005417 (1991)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 28, 1991 Number: 91-005417 Latest Update: Jan. 03, 1995

The Issue The issues for determination at final hearing were (1) whether Petitioner's coastal construction Permit No. 86-155PB, authorizing Petitioner to construct and temporarily maintain an experimental reef structure seaward of the DuPont residence in West Palm Beach, Palm Beach County, Florida, should be extended under Special Permit Condition 10 of the Permit and (2) whether the experimental reef structure should be removed pursuant to Special Permit Conditions 3 and 12 of the Permit.

Findings Of Fact On April 6, 1987, American Coastal Engineering, on behalf of Willis H. DuPont (Petitioner) and Florida Atlantic University's Department of Ocean Engineering, was granted coastal construction Permit NO. 86-155PB 3/ (Permit) by the Department of Natural Resources (Respondent). 4/ The Permit authorized Petitioner to construct and temporarily maintain an experimental reef structure seaward of the DuPont residence in West Palm Beach, Florida. The experimental reef structure, referred to as a prefabricated erosion prevention reef (PEP reef), is a 550 foot submerged breakwater which was constructed using prefabricated concrete segments, placed end-to-end underwater in the nearshore area. The purpose of the PEP reef is to reduce erosion of the beach landward of the structure. The PEP reef was installed on May 5, 1988. Special conditions were placed on the Permit, to which Petitioner agreed. The special conditions in pertinent part provide: The permittee shall adjust, alter or remove any structure or other physical evidence of the work or activity permitted, as directed by the Executive Director, if in the opinion of the Executive Director, the structure, work or activity in question results in damage to surrounding property or otherwise proves to be undersirable or becomes unnecessary. Adjustment, alteration, or removal required under this provision, shall be accomplished by the permittee at no cost to the State of Florida. * * * 10. The proposed submerged breakwater shall be removed within two years following installation of the experimental structure unless determined by the staff to remain in place for an extended period of time. This determination shall be based on a staff evaluation of the monitoring data, existing statutory regulations, and the feasibility of the project in concurrence with the beach management plan at that time. The experimental structure shall only remain in place after two years upon written approval from the Executive Director indicating an extension has been granted. * * * 12. The Executive Director may order removal of the experimental structure as soon as the shoreline along any portion of the area required to be nourished under Special Permit Condition 6 erodes up to or landward of the pre-nourished beach profile indicating a complete loss of the nourished beach material from that location and accretion at another location within the area to be monitored. Petitioner requested an extension of the Permit. On July 10, 1991, Respondent issued a final order denying an extension of the Permit, pursuant to Special Permit Condition 10, and directing the Petitioner to remove the PEP reef pursuant to Special Permit Conditions 3 and 12. An extension of the Permit beyond the two years following installation of the PEP reef, according to Special Permit Condition 10, is based upon three factors: (1) an evaluation by Respondent's staff of monitoring data gathered by Petitioner, (2) statutory regulations existing at the time of the extension request, and (3) the feasibility of the project in concurrence with the beach management plan existing at the time of the extension request. Although Petitioner's monitoring data addressed the question whether the PEP reef was performing its function, it did not address existing statutory regulations or the project's feasibility in concurrence with the current beach management plan. 5/ Petitioner's monitoring data was collected over a two-year period with surveys being performed through March 1990: March 1988 (preconstruction), May 1988 (post-construction), August 1988, December 1988, February 1989, April 1989, July 1989, November 1989, and March 1990. The data was collected along 17 profile stations: seven stations were located within or immediately adjacent to the boundaries of the PEP reef, and five to the north and five to the south of the PEP reef. The data indicated that the PEP reef was an experiment and approved by Respondent as an experiment. As a conclusion, Petitioner indicates that the PEP reef is functioning for the purpose it was designed in that it is providing a benefit to the beach. Respondent disagreed with Petitioner's conclusion. For one, Respondent disagreed with the method of analysis used by Petitioner to analyze the data because Petitioner's analysis failed to filter out seasonal effects. This procedure brought into play the first of the three factors in Special Permit Condition 10 which was used for denial of the Permit extension. Petitioner's monitoring data was utilized and analyzed by Respondent. Using the data gathered, Respondent created profile plots which are cross sectional depictions of the shoreline profiles and which displayed changes to the shoreline occurring during the survey period. Respondent used a shoreline change analysis in determining the PEP reef's effect on the shoreline in its vicinity. The analysis focused on the net change in the shoreline, i.e., the net change in the location of the mean high water line, factoring out the seasonal variations which occur along the coast by comparing profile plots from the same time of year taken during the two-year monitoring period. The shoreline change analysis indicated that in the vicinity of the PEP reef the shoreline showed irregular periods of both accretion and erosion. However, the shoreline did not reflect the typical pattern that was expected with a functioning breakwater. To the contrary, the irregular periods of accretion and erosion and the irregular configuration of the shoreline indicated that factors other than the PEP reef were affecting the shoreline. One such intervening factor was attributed to the large number of existing shoreline structures called groins which are scattered throughout the area. Groins are structures intended to stabilize the shoreline by blocking the down drift movement of sand, thereby altering the natural coastal processes. The monitoring data shows that, in terms of accretion or erosion, the PEP reef produced no recognizable influence on the shoreline in its vicinity. As to the second factor in Special Permit Condition 10, at the time the Permit was granted in 1988, no regulations specifically applicable to experimental structures existed. However, in 1989 a provision specifically addressing the permitting of experimental structures became law. /6 The provision provides that the "intent" of the Florida Legislature is to "encourage the development of new and innovative methods for dealing with the coastal shoreline erosion problem," and that, in authorizing the "construction of pilot projects using alternative coastal shoreline erosion control methods," the Respondent must determine, among other things, that "the proposed project site is properly suited for analysis of the results of the proposed activity." Groins in the PEP reef area alter the natural coastal processes and, therefore, play a significant role in the analysis of the shoreline processes. The effect of the groins affected the Respondent's ability to determine the effectiveness of the experimental structure. As a result, the Respondent was unable to make a determination in accordance with the legislative mandate. As to the third factor in Special Permit Condition 10, Petitioner presented no evidence addressing this factor. Petitioner has failed to show that the experimental structure, the PEP reef, has satisfied Special Permit Condition 10. It has failed to show that the intended purpose of the PEP reef has been accomplished, i.e., that the PEP reef is effective or beneficial. In denying Petitioner's request for an extension of the Permit, Respondent directed removal of the PEP reef pursuant to Special Permit Conditions 3 and 12. Special Permit Condition 3 provides for removal, alteration or adjustment of the PEP reef if it "proves to be undersirable or becomes unnecessary." The construction of the PEP reef consisted of, among other things, the placing of individual reef units end-to-end. To alert boaters to the location of the PEP reef, a buoy was placed at each end of the structure. The stability of the PEP reef is questionable. In 1989 a storm dislodged the individual units. In an effort to prevent sliding, Petitioner attempted to realign the units to their original position and added more weight to the units. Despite Petitioner's efforts to stabilize the structure, the PEP reef has experienced continued movement. Furthermore, because of the continued movement, boaters' safety would be compromised in that the buoys would be ineffective in warning them of the location of any units which may be dislodged. Also, the additional weight to the units could cause the individual units to settle, potentially affecting the performance of the PEP reef, and could induce erosional scour around the structure itself. Special Permit Condition 12 provides for removal when "the shoreline along any portion of the area required to be nourished . . . erodes up to or landward of the pre-nourished beach profile indicating a complete loss of the nourished beach material from that location and accretion at another location." The shoreline analysis showed that the shoreline in many portions of the nourished area eroded landward of the pre-nourished beach profile. The mean high water line had positioned landward of its pre-project location. Petitioner has failed to show that the PEP reef does not fall within the conditions of Special Permit Conditions 3 and 12. Federally protected and endangered marine species have attached themselves to and/or now reside in the PEP reef, complicating the removal of the PEP reef. In order not to disturb or disrupt this marine life, Respondent has expressed a desire in relocating the structure to a position further offshore.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Natural Resources 7/ enter a final order DENYING an extension of Permit No. 86-155PB. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 21st day of April 1994. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of April 1994.

Florida Laws (2) 120.57161.041
# 2
TED WIESE AND SHIRLEY WIESE vs. DEPARTMENT OF NATURAL RESOURCES, 83-001177 (1983)
Division of Administrative Hearings, Florida Number: 83-001177 Latest Update: Aug. 22, 1983

The Issue The issue in this case is whether a beach house petitioners plan to build in south Walton County was already under construction, within the meaning of Section 161.053(7), Florida Statutes (1981) and Rule 16B-33.04(1), Florida Administrative Code, at the time the current coastal construction control line took effect there.

Findings Of Fact In October of 1982, the petitioners acquired a lot in south Walton County, on the north shore of the Gulf of Mexico. Even before the purchase, Mr. Wiese had been in touch with respondent's personnel, who apprised him of the imminence of the adoption of the new (now current) coastal construction control line, at that time already proposed for Walton County. The former coastal construction control line was considerably seaward of the current line, which became effective on December 29, 1982. Petitioners, who have built some seven houses, drew plans for a house to be built on their Walton County lot one foot landward of the old coastal construction control line. They applied for and obtained the necessary county building permit. They contracted for grading on site, which took place on November 27, 1982. In the course of this work, the landward face of the sand dune was disturbed and petitioners realized that, if they were to build so close to the water, a wall or something like a wall would have to be erected and buttressed to keep the sand dune from migrating under or into their beach house. They determined that the plans were inadequate as drawn. Mr. Wiese nevertheless arranged for one Al Christopher to bring two poles to the site and place one of them upright in the sand. When asked at hearing how long the two poles Mr. Christopher delivered to the site were, Mr. Wiese said he did not know. After Mr. Christopher began, petitioners did not ask him to desist either with bringing pilings to the site or with placing them in the ground. Mr. Christopher evidently did what he was asked to do, before he ever began working with the poles. Before the single pile was placed, batter boards were used to locate the perimeters planned for the building. Batter boards are temporary markers which are removed once the foundation is in place. In constructing piling foundations for beach houses along the gulf coast, in this part of Florida if not elsewhere, the ordinary sequence is to bring all foundation piles to the site before bringing the equipment necessary to install all the piles at once. This makes for efficient use of expensive machinery, and is virtually always done. One of the Wieses' neighbors, fearing that the new coastal construction control line would take effect last fall arranged for a single pile to be driven, but his project was well underway by the time the new coastal construction control line did in fact take effect. As late as March of this year, Mr. Wiese checked with a Texas supplier to see if foundation piles would be available for the project. The plans drawn before the grading of November 27, 1982, called for a foundation of 37 piles, each of which was to be 45 feet long. No horizontal members nor bracing of any kind was contemplated for the foundation. The foundation piles were to be put so close together that it would have been impractical to bring heavy equipment in to do the grading after they were in place. The idea in leveling the ground was to prepare it so a concrete slab could be poured to serve as a parking surface underneath the beach house. Under both the plans originally drawn and the plans under which petitioners now hope to proceed the parking surface itself is not expected to have a structural function, Mr. Wiese's testimony to the contrary notwithstanding. Once petitioners were persuaded that the project needed "reengineering," they diligently sought out expert assistance and new foundation plans were eventually drawn to their satisfaction. Petitioners' efforts took place on a regular, if not a daily basis, but consisted in large part of finding the right people for the "reengineering" job. The plans which petitioners propose to use were stamped with the final engineer's seal on March 3, 1983, more than two months after the current coastal construction control line took effect.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That respondent deny petitioners' beach house project grandfathered status, and apply the coastal construction control line adopted for Walton County on December 29, 1982, in any agency action regarding the project. DONE and ENTERED this 22nd day of August, 1983, Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 ApA1Achee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of August 1983. COPIES FURNISHED: Joseph C. Jacobs, Esquire John C. Pelham, Esquire and Melissa Fletcher Allaman, Esquire ERVIN, VARN, ODOM & KITCHEN Post Office Box 1770 Tallahassee, Florida 32322-1170 Deborah A. Getzoff, Esquire Suite 1003 Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32303 Elton Gissendanner, Director Executive Suite 3900 Commonwealth Building Tallahassee, Florida 32303

Florida Laws (2) 120.56161.053
# 3
RONNIE E. YOUNG, PAMELA C. YOUNG AND LISA R. SCHRUTT vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, RANDOLPH E. BROWN AND NANCY F. BROWN, 04-003426 (2004)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Sep. 22, 2004 Number: 04-003426 Latest Update: Sep. 28, 2005

The Issue The issue is whether the Department of Environmental Protection should issue a permit to the Browns authorizing construction on their property, which is seaward of the coastal construction control line.

Findings Of Fact Property Descriptions (1) The Browns’ Property The Browns own Lots 5, 6, 7, 15, and 16 of a platted subdivision known as the First Addition of Anna Maria Beach Subdivision, Block 35 (the Subdivision). The Subdivision is on Anna Maria Island in the City of Anna Maria, which is in Manatee County. All of the Browns’ lots are seaward of the CCCL established by the Department for Manatee County. The parties stipulated that the construction authorized by the permit at issue in this proceeding is landward of the 30- year erosion line. Indeed, according to the analysis of the permit application prepared by the Department’s staff, the 30- year erosion line is approximately 111 feet seaward of the proposed construction. See Browns’ Exhibit 6, at 3. Lot 5 is the most landward lot owned by the Browns. Lot 6 is adjacent to and seaward of Lot 5, and Lot 7 is adjacent to and seaward of Lot 6. Lots 15 and 16 are seaward of Lot 7, and they are separated from Lot 7 by a 10-foot wide “vacated alley.” The Subdivision was platted in 1912. The plat of the Subdivision, Exhibit P6, shows the seaward edge of Lots 15 and 16 bordering on a road named Gulf Boulevard, which appears to be some distance inland from the Gulf of Mexico.2 Gulf Boulevard no longer exists, and all of Lots 7, 15, and 16 are now located on the sandy beach between Lot 6 and the Gulf of Mexico. The seaward edge of Lot 6 is approximately 176 feet landward of the mean high water line (MHWL) of the Gulf of Mexico. See Exhibit P5B. There are no structures or improvements located on Lots 7, 15, or 16. There are also no structures or improvements located on Lots 8, 9, and 10, which are to the north of Lots 7, 6, and 5, respectively. See Exhibit P4. Lot 10 was the subject of a CCCL permit application denied by the Department in 2000 based upon the Recommended Order issued in DOAH Case No. 99-3613, which is referred to by the parties as “the Negele case.” See Exhibit P30. There is an 850-square-foot single-family residence on Lots 5 and 6 that was constructed in the 1920’s and is used by the Browns as a vacation home. The property’s address is 104 Pine Avenue. All of the enclosed living area of the residence is on Lot 5. A wooden deck attached to the residence extends approximately 17 feet onto Lot 6, and at its most seaward point, the deck is 262.41 feet seaward of the CCCL. See Browns’ Exhibit 9. There are no structures on Lot 6 other than the wooden deck. More than half of Lot 5 has been previously disturbed. In addition to the Browns’ residence, there is a small wood “tool shed” located on that lot. The disturbed areas on Lot 5 between the residence and the shed and between the shed and Pine Avenue (see Exhibit P5C, areas marked with a yellow “1” and “2”) are used by the Browns for, among other things, parking and storage of boats. Those areas have very little vegetative cover. The northwest portion of Lot 5 is undisturbed and, as more fully discussed below, that area is densely vegetated with sea oats, sea grapes, and century plants. (2) Schrutt’s Property Schrutt owns Lot 4 of the Subdivision, which is adjacent to and immediately landward of the Browns’ Lot 5. The property’s address is 108 Pine Avenue. There is a two-story single-family residence on Lot 4 that Schrutt uses as a vacation home. Schrutt’s vacation home extends farther to the northwest than does the residence on the Browns’ lot. As a result, Schrutt currently has an unimpeded view of the Gulf of Mexico over the Browns' shed and across the undisturbed portion of the Browns’ lot from her second-floor deck. See Exhibits P2F and P5A. (3) The Youngs’ Property The Youngs own Lot 3 of the Subdivision, which is adjacent to and immediately landward of Schrutt’s lot and approximately 50 feet landward of the Browns’ Lot 5. The property’s address is 110 Pine Avenue. There is a three-story single-family residence on Lot 3 that the Youngs use as a vacation home. The Young’s vacation home is set farther back from Pine Avenue than are the residences on the Browns’ lot and Scrutt’s lot. As a result, the Youngs currently have an unimpeded view of the Gulf of Mexico across Schrutt’s lot and the undisturbed portion of the Browns’ lot (as well as across Lot 10) from their second- and third-floor decks. See Exhibits P2F and P5A. The Proposed Project and its Permitting History On March 30, 2004, the Browns submitted to the Department an application for a CCCL permit to allow them to construct an addition to their existing residence on Lots 5 and 6 (“the Project” or “the proposed construction”). The Project will include the renovation of the existing residence, additional residential space in an elevated structure on a pile foundation that will be connected to the existing residence, an elevated swimming pool and deck on a pile foundation, and a driveway made of pavers. There will be a concrete slab under a portion of the new elevated structure in the vicinity of the existing shed that will be enclosed and used as a two-car garage. See Browns’ Exhibit 14, sheet 9; Transcript, Volume 2, at 163-64. The finished floor elevation of the garage slab will be 7.0 feet above sea level/NGVD,3 which is slightly lower than the 8.4-foot finished floor elevation of the Browns’ existing residence. The elevated portions of the proposed construction will be 19.2 feet above sea level/NGVD, with a finished floor elevation between 20.2 and 20.7 feet. The “footprint” of the proposed construction is predominately on Lot 5, but it does extend 10 to 15 feet onto Lot 6. See Exhibit P5B, blue cross-hatched area. The seaward extent of the Project is in alignment with the existing residence and deck on the Browns’ property. After completion of the Project, the Browns’ vacation home will include approximately 2,500 square feet of enclosed space. The Browns’ permit application did not mention Schrutt, whose lot is adjacent to the lots on which the Project will be located, even though the application form requires the applicant to list “[t]he name and mailing address of the owners of the immediately adjacent properties . . . .” The reason for this omission is not entirely clear. The permit application included a letter from Kevin Donohue, Building Official, on the letterhead of the City of Anna Maria, which states that “[a] review of the proposed activity described in the seventeen-page plan package for an addition and alternation to an existing single family dwelling does not contravene the City of Anna Maria Code of Ordinances, Comprehensive Plan, and the Florida State Building Code.” The “seventeen-page plan package” referenced in Mr. Donohue’s letter is the same set of plans that the Browns submitted to the Department with their application. Those plans were received into evidence as the Browns’ Exhibit 14. The parties stipulated that the City of Anna Maria building and zoning codes require structures to be set back at least 10 feet from the property line. The site plan for the Project shows the new elevated portion of the Browns’ residence exactly 10 feet from Schrutt’s Lot 4, and exactly 10 feet from the “alley” that runs between Lot 5 and Lot 10 to the north.4 Mr. Brown testified that the City prohibits on-street parking on Pine Avenue, which explains (at least in part) why the Project includes driveway pavers and a concrete slab/enclosed garage under a portion of the new elevated structure for parking. There have been no material modifications to the Project since the date of Mr. Donohue’s letter and, as discussed below, no material modifications will be necessary for the Project to satisfy the special permit conditions imposed by the Department. Thus, it is appropriate for the Department to continue to rely on the letter as proof that the Project does not contravene the applicable local codes. The survey submitted with the Browns’ permit application was dated September 4, 2002, which is approximately 18 months before the date of the application. The survey identified a “vegetation line” along the seaward edge of Lot 6 behind an area designated as “rocks,” and its also included the notation “sea oat existing” in the area between the vegetation line/rocks and the Browns' existing home as well as in the area of the Project. Neither the survey, nor any other information provided to the Department with the permit application showed the extent of the vegetation and dune features in the area of the Project with the same level of detail as is shown on Exhibits P5A, P5B and P5C and the Browns’ Exhibits 30A and 30B. By letter dated April 21, 2004, the Department requested additional information about the project, including a “topographic survey drawing of the subject property . . . from field survey work performed not more than six months prior to the date of the application.” By letters dated May 3, 12, and 13, 2004, the Browns provided additional information about the Project pursuant to the Department’s request. They did not provide a more current survey than the September 2002 survey included with the application, although they did provide a signed and sealed copy of the 2002 survey. Notwithstanding the Browns failure to provide a more current survey, the Department apparently considered the Browns’ application to be complete because on July 29, 2004, the Department advised the Browns that their CCCL permit application for the Project was approved. The Browns’ failure to comply with the technical submittal requirements relating to the survey is not material as a result of the more current and more detailed survey information presented at the final hearing. The Department’s approval of the Browns’ permit application was subject to the general permit conditions in Florida Administrative Code Rule 62B-33.0155, as well as a number of special permit conditions, including: No work shall be conducted under this permit until the permittee has received a written notice to proceed from the Department. Prior to issuance of the Notice to Proceed, the permittee shall submit two copies of revised site plan depicting the swimming pool and deck extending a maximum distance of 265 feet seaward of the coastal construction control line. (Italics in original). * * * All vegetation located seaward of the coastal construction control line shall be preserved except for that disturbance which is necessary for dwelling construction. Prior to completion of construction activities authorized by this permit, the permittee shall plant a mix of a minimum of three native salt-tolerant species within any disturbed areas seaward of the authorized structures. Plantings shall consist of salt-tolerant species indigenous to the native plant communities existing on or near the site or with out native species approved by the Department . . . . As permitted, the various components of the Project are to be located as follows: the new elevated portion of the residence, a maximum of 259.4 feet seaward of the CCCL; the addition to the existing residence, a maximum of 249.4 feet seaward of the CCCL; and the elevated swimming pool and deck, a maximum of 265 feet seaward of the CCCL. On August 16, 2004, the Browns provided a revised site plan to the Department in purported compliance with special permit condition No. 2. The revised site plan was received into evidence as the Browns’ Exhibit 9. The revised site plan does not comply with special permit condition No. 2. It continues to show the pool and deck extending 268.41 feet seaward of the CCCL and it also shows a “pool security fence” extending 272.41 feet seaward of the CCCL. By letter dated August 25, 2004, the Department advised the Browns that the distances shown on the revised site plan were not consistent with the special permit conditions, and directed the Browns to “fulfill the conditions as per the approved [permit].” The location of the Project shown on the revised site plan (Browns’ Exhibit 9) is identical to the location of the Project on the original site plan (Browns’ Exhibit 14, sheet 3). The only difference between the two site plans is that the revised site plan includes two measurements not included on the original site plan showing the seaward corners of the new elevated deck 258.41 feet and 268.41 feet seaward of the CCCL. In order to comply with special permit condition No. 2, the plans will have to be revised to eliminate those portions of the Project that extend more than 265 feet seaward of the CCCL. The Project cannot be shifted farther landward because it already abuts the 10-foot setback line. The necessary revisions to the plans can be done without shifting the Project landward by eliminating a relatively small area of the deck and portions of the pool security fence. The Browns’ ability to satisfy the Department's special permit conditions by making minor modifications to the Project and not encroaching into the 10-foot setback distinguishes this case from the Negele case.5 Dunes, Generally A dune is a mound of sand lying upland of the beach that has been deposited by natural or artificial means and that is subject to fluctuations in configuration and location. It is not necessary for a mound of sand to be covered with vegetation to be considered a dune. However, vegetation promotes the growth of dunes and helps to stabilize dunes by trapping wind-blown sand. The expert testimony in this case (e.g., Transcript, Volume 1, at 147-48, and Volume 3, at 26-28) identified three different types of dunes -- significant, primary, and frontal -- and described each type consistent with the statutory and rule definitions quoted below. A “significant dune” is a dune that has “sufficient height and configuration or vegetation to offer protective value.” Fla. Admin. Code R. 62B-33.002(17)(a) (emphasis supplied). A “primary dune” is a significant dune that has “sufficient alongnshore continuity to offer protective value to upland property.” Fla. Admin. Code R. 62B-33.002(17)(b). A “frontal dune” is the “first [dune] which is located landward of the beach and which has sufficient vegetation, height, continuity, and configuration to offer protective value.” § 161.053(6)(a)1., Fla. Stat. (2004) (emphasis supplied).6 Thus, a primary dune need not have vegetation so long as it has sufficient height, configuration, and continuity to offer protective value, but a frontal dune must have vegetation in addition to height, configuration, and continuity that offers protective value. The Browns’ contention to the contrary (e.g., Browns’ PRO, at 18) is rejected based upon the unambiguous statutory and rule language. Dunes in Southwest Florida are generally lower in height than are dunes in other parts of the state. However, the dunes on Anna Maria Island, including the dunes on and in the vicinity of the Browns’ property, are substantial for Southwest Florida. The Beach-Dune System on and in the Vicinity of the Browns’ Property The beach on and in the vicinity of the Browns’ property has been relatively stable over at least the past several decades. In recent years, the stability of the beach is due in part to several beach nourishment projects undertaken by Manatee County pursuant to a shore protection plan authorized by the federal government in 1975 for Anna Maria Island. The most recent project, completed in 2002, included the beach on the Browns’ property and advanced the MHWL approximately 200 feet seaward. The shore protection plan is scheduled to continue through 2025, which will help to ensure the continued stability of the beach on and in the vicinity of the Browns’ property. It is undisputed that a primary dune runs across the Browns’ property. The parties disagree, however, as to whether that dune is also the frontal dune. The location of the primary dune on the Browns’ property is best shown on Exhibit P5B by the highlighted yellow lines. The seaward toe of the dune is in the vicinity of the six-foot contour line on Lot 6, and the landward toe of the dune is in the vicinity of the six-foot contour line on Lot 5. The dune is several hundred feet in length. It continues to the north of the Browns’ property onto Lot 10, and it continues to the south of the Browns’ property seaward of Pine Avenue. See Exhibit P5C and the Browns’ Exhibit 30B. The dune runs in a more northwesterly direction than does the shoreline. As a result, the portion of the dune that is seaward of Pine Avenue (to the south of the Browns’ property) is further seaward than the portion of the dune on the Browns property, which in turn, is further seaward of that portion of the dune on Lot 10. Id. The width of the dune varies. In the area of the proposed construction on the Browns’ property, the dune is 20 to 45 feet wide. The dune’s highest point on the Browns’ property is 7.8 feet. Its highest point on Lot 10 is 8.3 feet, and its highest point in the area seaward of Pine Avenue is 9.4 feet. The dune is vegetated with sea oats, sea grapes, and century plants, all of which are native salt-tolerant species. The vegetation on that portion of the dune on the Lots 5 and 6 is dense and mature. It is undisputed that the dune, in its current state, offers some protective value to upland properties, including the Petitioners’ properties. The evidence does not quantify the extent of the protection currently provided by the dune or the degree to which that protection will be diminished after the Project is constructed on the dune. Neither Petitioners’ expert coastal geologist nor the Browns’ expert coastal engineer did any modeling regarding the level of storm (e.g., 5-year, 10-year, etc.) that the dune provides protection against. The experts agreed, however, that the dune would likely not provide any significant protection against a 25-year or 50-year storm, which would have storm surges that exceed the height of the dune. There are dune features on the Browns’ property seaward of the primary dune described above. Those features, which were characterized as "incipient dunes" by Petitioners' expert coastal geologist, are delineated with red shading on the Browns’ Exhibit 30B and can be seen in several of the photographs received into evidence (e.g., Exhibits P2C and P2L, and Browns’ Exhibit 17L). Those dune features do not qualify as frontal dunes because they are sparsely vegetated (if at all), small in height (generally six inches or less), lack continuity, and offer no real protective value. Because the primary dune described above is the most seaward dune on the Browns’ property that has sufficient vegetation, height, continuity, and configuration to provide protective value, it is the frontal dune.7 Assessment of the Project’s Impacts An applicant for a CCCL must demonstrate that the impacts of the project have been minimized and that the project will not destabilize a primary or frontal dune or cause a “significant adverse impact,” as that phrase is defined in Florida Administrative Code Rule 62B-33.002(31)(b). The proposed construction at issue in this proceeding will be located on the frontal dune and will result in the removal of all of the existing vegetation on that dune within the “footprint” of the new structure. The evidence was not persuasive that the removal of that vegetation, although extensive, will destabilize the dune or result in a “significant adverse impact” to the beach-dune system due to increased erosion by wind or water. Indeed, there will still be dense vegetation seaward of and to the north and south of the new structure, and any vegetation outside of the “footprint” of the Project that is impacted by construction must be mitigated in accordance with the special permit conditions quoted above. The Project, as permitted, will not interfere with the beach-dune system’s recovery from coastal storms or cause the dune to become unstable or suffer a catastrophic failure such that its protective value to upland properties is significantly lowered. Indeed, there was no credible evidence that the Browns’ existing on-grade residence, which has existed since the 1920's on the same dune that the proposed structure will be located, has adversely impacted the recovery of the beach-dune system or the dune’s protective value. It is not necessary to evaluate the cumulative impacts of the Project because there was no evidence of any similar projects in the vicinity of the Browns’ property that have been permitted or for which a permit application is pending. Indeed, the only credible evidence related to this issue involved the Department’s denial of a permit for construction on the adjacent Lot 10, which generates no cumulative impact concerns and does not establish “precedent” in this case because the Department evaluates each CCCL permit application on its own merits. The Project, as permitted, will not result in a net removal of in situ sandy soils from the beach-dune system. The 33 cubic yards of soil that will be excavated for the Project will be spread on the Browns’ seaward lots and, therefore, will remain in the impacted beach-dune system. The Project will be elevated above the projected 100- year storm surge height and will meet applicable building code requirements. As a result, structure-induced scour will be minimized and will not cause any significant adverse impacts to the beach-dune system or the upland properties. The Project will be constructed in accordance with the Florida Building Code, which will minimize the potential for wind and waterborne missiles. The depth of the swimming pool is limited to 4.5 feet and its bottom elevation will be 3.8 feet above sea level/NGVD, which will minimize the amount of excavation necessary for the pool. The permit requires the excavated material to be placed “[i]n and around the proposed swimming pool area,” so there will be no net loss of material from the immediate area of the pool. Even though the proposed construction will be located on the frontal dune (rather than a sufficient distance landward of it), the Project will not have a significant adverse impact on the stability of the beach-dune system or preclude natural shoreline fluctuations. Indeed, the fact that the Browns’ existing residence has apparently not adversely impacted the stability of the beach-dune system or natural shoreline fluctuations over the past 80 years undermines Petitioners’ contentions regarding the potential adverse impacts of the proposed structures. The line of continuous construction identified by the Department during its review of the Browns’ permit application was 244 feet seaward of the CCCL, which is consistent with the findings in the Negele case. See Exhibit P30, at 14. The line of continuous construction is not a line of prohibition, but rather it is only a factor that must be considered in conjunction with all of the other permitting criteria in the statutes and the Department’s rules. There is evidence indicating that the line of continuous construction is more than 244 feet seaward of the CCCL. For example, the aerial photograph received into evidence as the Browns’ Exhibit 18A shows that the existing structures on the adjacent properties (particularly those to the south of Pine Avenue and those to the north of Elm Avenue8) are farther seaward than the Browns’ residence, which itself is more than 244 seaward of the CCCL. Consistent with the aerial photograph, the Browns’ Exhibit 30A depicts what is referred to as the “existing line of construction established by major structures in the area” seaward of the Browns’ deck, which as note above, is approximately 262 feet seaward of the CCCL. The Project, as permitted, extends to a maximum of 265 feet seaward of the CCCL and, as reflected on Exhibit P5B, a majority of the proposed construction is seaward of the 244-foot line. However, the Project (as proposed and as permitted) is landward of the line depicted on the Browns’ Exhibit 30A. The location of the proposed construction is not contrary to the Department’s rules even if the 244-foot line identified by the Department is correct because the Project is in alignment with the Browns’ existing residence and because there was no credible evidence that the existing residence has been unduly affected by erosion. The native salt-tolerant vegetation (e.g., sea oats, sea grapes, and century plants) impacted by the Project are dense and mature, and the degree of disturbance is significant. However, as noted above, there will still be dense vegetation seaward of and to the north and south of the proposed construction that will not be impacted and that will continue to provide protective value for the dune system and upland properties. Florida Administrative Code Rule 62B-33.005(11) requires disturbances to the existing native salt-tolerant plant communities to be “limited.” That rule also requires construction to be located “where possible” in previously disturbed areas. Locating the Project in the previously disturbed areas of Lot 5 rather than on the frontal dune would not increase adverse impact to the beach-dune system and, indeed, may reduce the impact by limiting disturbances to the existing native salt- tolerant plant communities. However, the Project could not be relocated into the disturbed areas because those areas are considerably smaller than the “footprint” of the proposed construction, particularly when the set-backs required by the local code and the on-street parking restrictions are taken into account. In sum, the preponderance of the evidence establishes that despite the its location on a portion of the densely vegetated frontal dune, the Project satisfies the permitting criteria in the Department’s rules and will not result in “significant adverse impacts” to the beach-dune system or upland properties. In making the foregoing findings, the undersigned did not overlook the contrary opinions of Petitioners’ expert coastal geologist. However, the undersigned found his testimony regarding the impact of the Project on the beach-dune system to be less persuasive the testimony of the Browns’ expert coastal engineer on that issue. Other Considerations The Project will not interfere with the public's lateral beach access, nor will it interfere with public access to the beach from Pine Avenue. The parties stipulated that the Project does not raise any concerns relating to sea turtles. The Project will effectively block Schrutt’s view of the Gulf of Mexico from her vacation home, and it will impair the Youngs’ view of the Gulf of Mexico from their vacation home.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department issue a final order approving the Browns’ permit application subject to the general and special permit conditions referenced in the Department’s July 29, 2004, letter and permit. DONE AND ENTERED this 15th day of August, 2005, in Tallahassee, Leon County, Florida. S T. KENT WETHERELL, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of August, 2005.

Florida Laws (5) 120.569120.57161.021161.053258.41
# 4
KELLY CADILLAC, INC., AND HUDSON CONSTRUCTION COMPANY vs RESORT HOSPITALITY ENTERPRISES, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-000342 (1997)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 22, 1997 Number: 97-000342 Latest Update: Jul. 02, 1998

The Issue The issues to be resolved in this proceeding concern whether the Department of Environmental Protection (DEP) has jurisdiction over the activities encompassed by Permit Application BA-475 (Amended) and, if so, whether issuance of the permit complies with the applicable provisions of Section 161.053, Florida Statutes, and Chapter 62B-33, Florida Administrative Code.

Findings Of Fact Undisputed Facts: The following relevant facts are established by stipulation or admission and are not disputed. The proposed project is landward of the seasonal high waterline within thirty (30) years of December 1996; The project will not interfere with public access; The project will not result in the net excavation of in situ sandy soils seaward of the coastal construction control line (CCCL); Any sandy soil or material excavated for the proposed project seaward of the control line will remain seaward of the control line or setback and be placed in the immediate area of construction; The proposed project complies with the structural provisions of Rule 62B-33.007(2), Florida Administrative Code; The proposed project complies with Rules 62B-33.007(3)(a) through (d) and (f) through (h), Florida Administrative Code. Additionally at hearing, the Petitioners and Intervenor announced that they would not present any evidence on the issue of adverse impacts on marine turtles. Accordingly, impacts on marine turtles are not at issue in this proceeding. Project Description: RHE has proposed constructing a restaurant, pool, deck and stormwater basin within the Boardwalk Beach Resort on Panama City Beach, in Bay County, Florida. The Boardwalk Beach Resort consists of four (4) multi-story hotels with six hundred (600) rooms all together, several pools, boardwalks extending the length of the property and approximately seventeen hundred (1,700) to eighteen hundred (1,800) feet of beach front property. The project site is between Thomas Drive to the north and the Gulf of Mexico to the south. On July 23, 1996, RHE applied to the Department for a CCCL permit to construct, seaward of the interim line established by the emergency Order of October 16, 1995, the restaurant, swimming pool and deck. Part of the proposed deck was located seaward of the coastal construction setback line. On December 9, 1996, the Department issued a permit to RHE to construct the restaurant building with an attached deck fifteen (15) feet landward of the location originally proposed by RHE, as well as for construction of the swimming pool. On December 16, 1996, the Department issued to RHE an Amended CCCL permit authorizing construction of a restaurant building located five (5) feet landward of the location originally proposed by RHE, as well as a deck re-designed so that it would be structurally independent of the restaurant, a swimming pool and a dune enhancement plan which would restore the sandy dune seaward of the pool and restaurant location to its pre-hurricane Opal condition and elevation. The Amended permit would require re-vegetation of the dunes at the site with native plants to secure the dunes from erosion. Both the original and the Amended permits authorized the removal of the stormwater drainage pipe that carried stormwater onto the beach that had caused erosion of the beach near the project area. On January 9, 1997, the Petitioners timely filed a Petition challenging the Department’s decision to issue the Amended permit. On February 7, 1997, the Department established a new CCCL line for Bay County that was farther landward than either the old coastal construction setback line or the interim line established in the October 1995 emergency order. The project authorized by the Amended permit would thus be located entirely seaward of the newly established CCCL for Bay County. As of February 7, 1997, the date the new line was established, RHE had not begun working on the foundation or continued construction above the foundation for any of the structures authorized by the Amended permit. The Department determined that the project did not meet the requirements of Section 161.053(9), and Rule 62B-33.004(1), Florida Administrative Code, so as to qualify for an exemption from complying with the newly established CCCL for Bay County, as the project was not “under construction” at the time the new CCCL was established. The beach and dunes system is wide and the dune system is a significant one, with elevations of fourteen (14) to sixteen (16) feet NGVD, with a wide dune crest. The dry sandy beach in front of the site, even after hurricane Opal struck, remained approximately one hundred twenty-five (125) feet wide. From 1855 to 1934 the shoreline of the site was mildly accretional. Thereafter, until 1955 accretion was less significant, but from 1955 to 1976 became significant. From February 1992 through April 1995, the project site experienced a period of mild erosion. Accordingly the long-term data shows, in essence, that the shoreline is relatively stable at the site. Hurricane Opal caused the dune to erode or retreat landward by approximately a distance of fifteen (15) feet. Hurricane Opal was a major magnitude storm with one hundred twenty-five (125) mile per hour sustained winds and one hundred forty-four (144) mile per hour measured gusts when it came ashore in the vicinity of the proposed site. The dune portion of the proposed site now essentially mimics the pre-Opal conditions. Following hurricane Opal the applicants spent approximately Four Hundred Thousand Dollars ($400,000.00) in dune restoration along the entire shoreline of the resort property, some seventeen hundred (1,700) to eighteen hundred (1,800) feet of shoreline. That dune restoration work was permitted by the Department. There is now little native salt-tolerant vegetation on the site in its natural pre-construction condition. An existing stormwater drainage pipe and catch basin extend onto the beach seaward of the location of the proposed restaurant. The existing pipe and basin have caused erosion of the beach and the sand dune system on the project site. Under the amended permit proposal the stormwater pipe and basin would be removed. All of the proposed structures authorized by the Amended permit would be landward of the pre-Opal coastal construction control line. The proposed pool will be located landward of the dune crest and fifty-five (55) feet landward of the toe of the dune. The proposed restaurant would also be located landward of the dune crest and two hundred five (205) feet landward of the mean high waterline. The original design of the project was for a much larger, three story restaurant. The original pool design called for a one hundred twenty foot pool extending from in front of the Comfort Inn to beneath the proposed restaurant, in effect being located on the first floor of the restaurant. At DEP’s request the size of the pool was reduced by fifty percent (50%) and it was relocated into the shadow of the Comfort Inn next door so that it will no longer serve as an integral part of the restaurant. Pool depths were also reduced to three (3) feet at DEP’s request. The pool, at DEP’s request, will now be constructed of Gunnite concrete material and will be frangible, that is, it will be designed to break up in storm-surge or storm-waves. This will serve to decrease the erosion which could be caused by storm-waves flowing over and around the pool structure. The same is true of the restaurant deck, which at DEP’s request has been re-designed to be separate from the restaurant and also designed to fail in storm conditions. The frangibility of the deck, as now proposed, will retard erosion during storm conditions, as the stormwater or waves will demolish the deck and remove it rather than scouring the sand dune around it. The Department also requested that the existing stormwater drain pipe and catch basin be removed and such a removal has been made a condition of the subject permit. This will require that the applicant design and build a new stormwater system. The applicant has agreed to this condition and the others referenced above. Vegetation: Construction of the proposed project will not result in the removal or destruction of native vegetation. There is no such vegetation on the site where the construction will take place. Thus, construction of the project will not result in removal or destruction of native vegetation which will either cause de-stabilization of a "frontal, primary or significant dune" or cause a significant adverse impact to the beach and dune system due to increased erosion by wind or water. A special condition of the proposed amended permit requires that the applicant submit a dune enhancement plan for restoration of the dunes seaward of the pool and restaurant to its pre-hurricane Opal condition, including re-vegetation. Such a plan was submitted by the applicant and it includes the planting of sea oats on one (1) foot centers. The planting of sea oats as part of the dune enhancement plan will constitute a significant improvement to the native vegetation situation at the site. Disturbance of Sandy Soils: The project will not result in the removal or disturbance of in situ sandy soils of the beach and dunes system to such a degree as to have an adverse impact on the system. That is, the existing ability of the system to resist erosion during a storm will not be reduced. The proposed project will not result in the removal or disturbance of in situ sandy soils of the beach and dune system to such a degree as to cause adverse impact to those systems by lowering existing levels of storm protection to upland properties and structures. All the sandy material excavated for the pool and the stormwater basin will be placed seaward of these structures on the dune in the immediate area of the construction and seaward of the CCCL. The additional sand to be placed on the dune as part of the dune enhancement plan will, in fact, enhance the ability of the system to resist erosion during the storm. The ability of the dune to resist storm erosion is primarily a function of the quantity of sand within the dune system. The additional sand to be placed on the dune as part of the dune enhancement plan will enhance the protection of upland properties and structures including those of the Petitioners and Intervenor. Excavation of the stormwater basin will not destabilize the dune on the project site. The applicant is moving the stormwater basin landward by twenty (20) feet which will minimize the potential impacts of the basin on the dune system. The preponderant evidence establishes that the structure of the pool and pool deck will not cause an increase in structure-induced scour of such a magnitude as to measurably affect shoreline change rates. Scour caused by the pool will not significantly interfere with the beach-dune system's ability to recover from a coastal storm. The frangible design of the pool decreases the likelihood that it will cause any scour. It will break up in a storm so that any scour caused by the pool would be minimal. Any scour caused by the pool would not disturb the topography or vegetation such that the coastal system would become unstable or suffer catastrophic failure. Scour would have no measurable effect. The proposed restaurant and deck will not cause an increase in structure-induced scouring during a storm of such a magnitude as to have a significant adverse impact. The restaurant and deck will be constructed on piles. Scouring around piles, in a storm situation, is very localized and insignificant. By constructing the restaurant and deck on piles at the design elevation, storm-surge and storm-waves will pass under the deck and restaurant. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune to permit natural shoreline fluctuations. The structures will be built on pilings and will be elevated above the storm-surge; thus they will not interfere with shoreline fluctuations. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune so as to preserve and protect beach and dune system stability, in terms of the lack of interference with such. Other structures in the area are seaward of the proposed restaurant and deck, including Pineapple Willies Restaurant, located eleven hundred feet to the west. Those structures have not caused instability of the beach during hurricane Opal. Typically, existing structures do not cause instability of the dune systems. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune so as to allow for natural recovery to occur following storm-induced erosion. Natural recovery commonly occurs under pile-supported elevated structures which is not the case with “slab-on-grade” structures which are not elevated. The pool and pool deck will permit natural shoreline fluctuations, will preserve and protect beach and dune stability, and will allow recovery after a storm because they are designed as frangible structures that will fail and disintegrate in a storm situation. Thus they will not appreciably affect the beach-dune system. Line of Construction: Most coastal construction in Bay County extends out to the pre-Opal CCCL while some construction extends beyond it. Throughout Bay County the line of construction is the pre-Opal CCCL. The line of construction is determined by the most seaward extent of similar existing structures in the immediate area of the proposed structure under consideration in a CCCL permit application. The proposed pool is landward of the line of construction determined by existing pools within the boardwalk beach resort. There are a number of existing multi-story structures to the east of the proposed restaurant that are located out to the pre-Opal CCCL. That pattern of construction continues to the east of the proposed restaurant. Approximately one thousand (1,000) feet to the east of the proposed restaurant is an existing multi-story major structure that is built out to the pre-Opal CCCL. The beach in the area of the project is highly developed with commercial and condominium buildings. Within eleven hundred to twelve hundred feet to the west of the proposed restaurant there is another major structure built out to the pre-Opal CCCL. Just beyond that structure are a number of additional major structures, including Pineapple Willie's Restaurant, that are constructed out to the pre-Opal CCCL. The multi-story major structures to the east and west of the proposed structure are within the immediate area of the restaurant. The proposed restaurant is located landward of the line of construction established by these major structures within its immediate area. That line of construction is the pre-Opal CCCL. DEP did not consider major structures more than one thousand (1,000) feet from the proposed restaurant when it determined the line of construction for the restaurant. It is DEP’s policy when reviewing CCCL applications not to consider structures more than one thousand (1,000) feet from a proposed structure when determining the line of construction. The one thousand (1,000) foot limit DEP uses to determine the line of construction is not embodied in a rule. There was no preponderant coastal engineering or other scientific evidence which justifies the one thousand (1,000) foot limit DEP imposes when it determines the line of construction. It was appropriate to consider the existing structures referenced above in assessing the line of construction for this amended permit application and considering those lying just beyond the one thousand (1,000) foot distance, because those existing structures dominate the coastal processees in the region and only lie just beyond one thousand (1,000) feet to the east and twelve hundred (1,200) feet to the west. If the Department had considered the above-referenced existing major structures just beyond one thousand (1,000) feet of the proposed restaurant, it would have been shown that the proposed project was landward of the thus established line of construction. No preponderant evidence was offered to explicate why the one thousand (1,000) foot limit was automatically adhered to in this situation. Moreover, the line of construction is not a prohibition in and of itself but rather is only one of several criteria that must be balanced in determining whether or not to approve a CCCL permit application. Projects have been approved seaward of the line of construction in the past. Minimization The location of the swimming pool at the most practicable landward location, the reduced size of the pool, as well as its frangible design and limited depth, has minimized its impact. The placing of the excavated material in the pool’s immediate area and the restoration of the dune in front of the pool and deck have minimized the impacts of the pool and deck. The construction of the restaurant on pilings with its design elevation above storm-surge and storm-wave elevations, together with locating it behind the dune crest and away from the active beach, has minimized the impact of the restaurant. The deck is on pilings as well, elevated above storm-surge and storm-wave levels. It will be physically separate from the restaurant and its design frangibility (so that it will fail in a storm) results in its impact being minimized. The stormwater basin is located as far landward as practicable. Its location and the placing of the materials excavated for the basin on the dune immediately adjacent to the basin has minimized the impact of the proposed stormwater basin on the beach-dune system. The restaurant, pool, deck, and stormwater system will not have a significant adverse impact to the beach-dune system. The restaurant will not adversely affect exiting shoreline change rates, will not significantly interfere with recovery following a storm, and will not disturb topography or vegetation such that the system will become unstable or suffer catastrophic failure. Cumulative Impacts The proposed project will not have an unacceptable cumulative impact. There are no other proposed similar projects to take into account and a cumulative impact assessment has shown there to be no adverse cumulative impact. No evidence was offered to show that an unacceptable adverse cumulative impact in terms of existing or other proposed projects will result. Positive Benefit The proposed project will have a net positive benefit on the beach-dune system. The removal of the slab-on-grade constructed building will have a beneficial impact because it will reduce the chance of storm erosion to the beach-dune system posed by such structures. The existing stormwater pipe and catch basin which cause erosion would be removed, resolving that erosion problem. Stormwater will now be retained in a new stormwater basin designed to serve 1.7 acres and it will not flow onto the beach for any rainfall event up to a one hundred year design storm. The new stormwater system is designed to recover quickly after a storm event and to treat stormwater. The removal of the stormwater pipe and catch basin, and the installation of the new stormwater basin will have a positive benefit to the beach-dune system. The new stormwater system complies with Special Permit Condition 7. Moreover the applicant will restore the dune seaward of the project to its pre-hurricane Opal condition and will plant sea oats, on one foot centers, throughout the restoration area in accordance with Special Permit Condition 1.8. Such restoration of the dune and vegetation will benefit the beach-dune system. The natural recovery process will take several decades without the placement of sand in the dune restoration project. The dune enhancement plan submitted by the applicant, in order to comply with Special Permit Condition 1.8, exceeds the requirements of that condition since it places more sand on the dunes than necessary to achieve pre-Opal conditions. Testimony of expert witness Michael Walhter, which is accepted, establishes that restored beaches and dunes function much like natural ones in storm events even though they can be somewhat inferior in resistance to storm-surge and waves since the sand is not as compacted at first. This dune enhancement plan, however, exceeds the permit requirements by placing more sand than necessary on the dunes to achieve pre-Opal conditions. The Interim CCCL On October 16, 1995, the DEP issued its emergency Order establishing an interim CCCL for Bay County one hundred feet landward of the pre-Opal CCCL. The Department established that interim line in order to regulate coastal development in the wake of Hurricane Opal. In 1978 the Legislature established criteria to be used by DEP in establishing or re-establishing all CCCL’s. They are thus to be established to define that portion of a beach-dune system subject to severe fluctuations from a one hundred year storm event. At the time of Hurricane Opal, DEP had not re-established the Bay County CCCL using a one hundred year storm event criterion. The interim CCCL for Bay County established by the above-referenced emergency Order did not utilize nor was it based on the statutory one hundred year storm event criterion. All twenty-three (23) other CCCL’s that have been established based on the statutory one hundred year storm event criterion were established by rule. As of January 15, 1997, the applicant had received all governmental approvals necessary to begin construction of the proposed project except for that which is the subject of this proceeding. On January 22, 1997, DEP by letter advised the applicant to cease and desist construction of the project. On February 7, 1997, the Department by rule then taking effect established a new CCCL.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, and the candor and demeanor of the witnesses, it is, therefore, DETERMINED: That the Department of Environmental Protection has jurisdiction over the proposed project and that it is, therefore, recommended that a Final Order be entered granting the Respondent, Resort Hospitality’s CCCL application consistent with the terms and conditions espoused by the Final Order of December 17, 1997, Respondent’s Exhibit 2 and the project plans depicted in Respondent’s Exhibits 3 and 4. DONE AND ENTERED this 30th day of January, 1998, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January, 1998. COPIES FURNISHED: Bram D. Canter, Esquire 103 North Meridian Street Tallahassee, Florida 32301 Thomas I. Mayton, Jr., Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Thomas G. Tomasello, Esquire 1315 East Lafayette Street, Suite B Tallahassee, Florida 32301 Neil H. Butler, Esquire Butler and Long, P.A. Post Office Box 839 Tallahassee, Florida 32302-0839 Kathy Carter, Agency Clerk Office of General Counsel 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 F. Perry Odom, Esquire Office of General Counsel 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (5) 120.54120.57120.68161.021161.053 Florida Administrative Code (6) 62B-26.02462B-33.00262B-33.00462B-33.00562B-33.00762B-33.008
# 5
SEASCAPE CONDOMINIUM I ASSOCIATION, INC., ET AL. vs. BONITA BEACH CLUB ASSOCIATION, INC., AND DEPARTMENT OF NATURAL RESOURCES, 81-000550 (1981)
Division of Administrative Hearings, Florida Number: 81-000550 Latest Update: Dec. 16, 1981

Findings Of Fact The Problem: A Seawall In Danger of Collapse Applicant is an incorporated condominium association which owns the Gulf front property of Bonita Beach Club, a residential condominium located on the northern portion of a barrier island known as Little Hickory Island. The island is south of Fort Myers and part of Lee County. (Testimony of Truitt, Tackney; R-1.) Applicant's Gulf front property is protected by a 600-foot seawall; that seawall, exposed to wave and storm attack, is now in the beginning stages of failure. Applicant seeks a permit to place a revetment along the entire seaward face of the seawall "to help strengthen the seawall and stop the erosion at [its] . . . base . . . ." (R-1.) (Testimony of Truitt, Tackney, Sharma; R-1) The seawall shows evidence of profile lowering; sand has been scoured from its face, exposing 6 to 7 feet of wall above the sand line. Its face shows abrasions from buffeting by sand and sediment; its joints have begun to separate, allowing sand from behind the wall to leak through the cracks. Under high tide conditions, the seaward portions of the seawall are under water; under other tidal conditions there is no more than 6 to 7 feet of wetsand area between the base of the wall and the waterline. (Testimony of Truitt.) The present condition of the seawall is mainly due to two processes: the long-term shoreline migration of Little Hickory Island, and (2) profile steepening, scouring, and accelerated sand loss in the immediate vicinity of Applicant's seawall. There is a south-to-north longshore or littoral sand transport in the area off Little Hickory Island, a northward flowing "river of sand." This phenomenon has caused sand loss to beaches in front of and south of Applicant's property and sand accretion to the undeveloped northern beaches north of the island. The localized profile steepening and accelerating sand loss at Applicant's seawall is caused by waves hitting the vertical seawall, then rebounding-- causing removal of sand at the foot of the wall and steepening of the offshore profile. This localized sand loss and erosion has been aggravated by the original placement and alignment of Applicant's seawall. 7/ The seawall protrudes further seaward than adjacent seawalls or bulkheads. 8/ This protrusion, together with the wall's irregular shape, disrupts the otherwise straight shoreline and acts as a headland: an abutment which concentrates wave energy and longshore currents and causes accelerated erosion and sand loss in the immediate area. The effects of the northerly longshore drift and the localized sand loss have been dramatic: between 1974 and 1980 the sandy beach in front of Applicant's seawall has receded landward 50-60 feet. (Testimony of Truitt, Tackney, Sharma; P-1, P-2, P-3, P-4, 1-2, R-3, R-4, R-5, R-6, R-7.) In addition, the shoreline of Little Hickory Island is gradually and inexorably eroding. This is due to long-term backyard erosion, a natural )process by which barrier islands gradually migrate landward. (Testimony of Sharma, Tackney, Truitt.) II. Applicant's Solution: Place a Rock Revetment in Front of the Seawall In October, 1980, Applicant applied for a DNR permit to place a rock revetment along the existing seawall. By January, 1981, DNR's Bureau of Beaches and Shores determined that all of the documentation required by its rules 9/ had been submitted and the application was complete. Subsequently, the Applicant agreed to several design changes suggested by DNR and agreed to a permit condition requiring it to dedicate a travel easement to assure continued public access to beaches north of its property. As so modified, DNR proposes to issue the requested permit. (Testimony of Truitt; R-1, -R-11, R-12.) The proposed permit, with conditions, is contained in Respondent's Exhibits R-1, R-11, and R-12. 10/ The proposed shore protection structure is described as a rock toe-scour revetment to be placed along the seaward face of Applicant's existing seawall. The revetment extends 7 feet in the shore-normal direction and approximately 600 linear feet in the shore-parallel direction. It will consist of lime-rock boulders of various sizes stacked on top of each other. The top layer of rocks will be the largest, 75 percent of them weighing greater than 500 pounds. The rock revetment will rest on a layer of Filter-X mat to help stabilize the underlying sand. The revetment's elevation will range from 0.0 feet (NGVD) 11/ at the toe of the seawall to -0.5 feet (NGVD) at 7 feet seaward. Its slope will be no greater than 3 horizontal units to 1 vertical unit. The mean high waterline will intercept the revetment-seawall interface at a maximum elevation of approximately +1.5 feet (NGVD). (R-1, R-11, R-12.) III. The Effects of the Proposed Revetment The proposed revetment will fulfill its primary purpose: it will protect the Applicant's seawall by reducing the amount of sand that is scoured and removed from its face and it will add significant structural stability to the wall. It will provide these benefits because its sloping surface will intercept and dissipate waves which would otherwise hit and rebound off the vertical seawall. Because wave deflection energy will be lessened, steepening of the offshore profile will be reduced and accelerating longshore currents will be slowed. It will also protect the seawall against storm, but not hurricane, damage. (Testimony of Truitt, Tackney.) However, the proposed rock revetment will not stop the migration of sands from the southern to the northern reaches of Little Hickory Island; the northward flowing longshore currents will continue. Neither will the revetment protect Applicant's property against long-term background erosion; the entire island will continue its steady easterly retreat to the mainland. Scouring at the ends of the existing seawall will be reduced, but not eliminated. Eddy currents at the ends of the revetment will cause some localized scouring to take place. Wave and water action will take its toll on the revetment; it will require periodic repair and rebuilding in the years ahead. (Testimony of Sharma, Tackney, Truitt.) Although the testimony is conflicting, the weight of the evidence is that the proposed revetment will not adversely affect adjacent beaches and the offshore profile. 12/ While localized scouring will not be eliminated, the evidence indicates that the rates will be lessened--that the existing erosion problems will be mitigated, not aggravated. With reduced localized scouring, longshore currents will not accelerate, and the offshore profile will not deepen at increasing rates. The expert witnesses agreed that, at least for the short term, the proposed revetment will protect the existing seawall against at least three-year storm conditions. (Testimony of Tackney, Truitt, Sharma.) While the revetment will not accelerate or contribute to the erosion of adjacent lands, it will impair the public's use of the beaches in front of and to the north of the Applicant's seawall. Because the revetment will protrude 6 to 7 feet seaward from the seawall--intercepting the mean high waterline--the public will be precluded from traversing the beaches in front of Applicant's property. That narrow corridor of wet-sand beach now permits dry passage only during low tide. With placement of the rock revetment on that passageway, it will become impassable to most people who use the Little Hickory Island beaches. 13/ (Testimony of Sharma, Member of the Public.) Generally, rip-rap revetments, such as that proposed by Applicant, do not eliminate erosion or cause sand to accrete. Rather, they tend to increase erosion and escarping beyond that which would occur if a shoreline is left in its natural, unaltered condition. (Testimony of Sharma, Truitt, Tackney.) IV. DNR Coastal Construction Permits: Practice and Policy There may be alternatives to the proposed revetment which will not endanger the Applicant's upland structure or block the public's access to beaches in front of and north of Applicant's property. 14/ DNR does not require the consideration of shore protection alternatives when it processes coastal construction permit applications. Neither, in its view, is public access to adjacent beaches a matter of regulatory concern in this licensing process. 15/ At the staff level of DNR, the sole consideration is engineering design of the proposed structure: At the level of staff of the Bureau of Beaches and Shores there are no other con- siderations other than simply engineering judgments on the appropriateness or other considerations of the design. I have no idea what the governor and cabinet or exec- utive director may consider. (Tr. 170.) This view of the agency's duty helps explain why DNR has never denied an application to construct a shore protection revetment, although it has suggested design modifications, as was done in this case. (Testimony of Truitt.) V. Interests of Objectors to Proposed Revetment Project DNR requires applicants for coastal construction permits to provide a map showing the location of the proposed erosion control structure and the shoreline for at least 1,000 feet on each side. Applicants are also required to provide a list of the names and addresses from the latest county tax role of all riparian property owners within 1,000 feet. It is DNR practice, in accordance with its rule, Section 165-24.07, Florida Administrative Code, to mail notice of a proposed project to those riparian property owners. By rule, such interested persons or objectors to a proposed project have the right to appear and make their positions known to the Governor and Cabinet at the time the agency decision is made. Id. (Testimony of Truitt; R-1.) Petitioners, Casa Bonita I and II Condominium Associations, Inc., and Seascape Condominium I and II Associations, Inc., assert that the proposed revetment will adversely affect their rights as riparian owners, that it will cause erosion of their shorelines; they also allege that it will prejudice their recreational use of sovereignty lands--the public's beaches lying below the line of mean high water. Relative to the site of the proposed revetment, Casa Bonita I Condominium Association, Inc., lies 1,350 to 1,400 feet south; Casa Bonita II Condominium Association, Inc., 670 feet south; Seascape Condominium I and II Associations, Inc., lie immediately adjacent to the site. (Testimony of Tackney; R-1, R-14.) No evidence was presented to establish that intervenor Lee County is a riparian property owner within 1,000 feet of the proposed revetment. The Lee County Board of County Commissioners were, however, notified of the instant application and given an opportunity to object. The parties have submitted proposed findings of fact; to the extent such findings are incorporated in this Recommended order, they are adopted; otherwise they are rejected as irrelevant to the issues presented or unsupported by the preponderance of evidence.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That the application of Bonita Beach Club Condominium Association, Inc., for a coastal construction permit be GRANTED, subject to the agreed-upon conditions described above, including the dedication of a travel easement allowing the public to circumvent the 600-foot rock revetment. 21/ DONE AND RECOMMENDED this 16th day of October, 1981, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 Telephone: (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of October, 1981.

Florida Laws (9) 120.52120.57120.62120.66161.041161.0415161.053253.77403.412
# 6
ROLAND PETERSEN vs. DEPARTMENT OF NATURAL RESOURCES, 85-004012 (1985)
Division of Administrative Hearings, Florida Number: 85-004012 Latest Update: May 14, 1986

Findings Of Fact Petitioner, Roland Peterson, is the owner of Lots 4, 5 and 6, Block 7, Vilano Beach, in an unincorporated area of St. Johns County, Florida. Vilano Beach lies just eastward of the City of St. Augustine, Florida, and north of St. Augustine Inlet. The three lots are adjacent to each other. By applications dated June 7, 1985 petitioner sought the issuance of three coastal construction control line permits by respondent, Department of Natural Resources, Division of Beaches and Shores (Division), to authorize construction seaward of the coastal construction control line or setback line on Lots 4, 5 and 6. More specifically, petitioner sought approval to construct a beach-side snack bar with associated beach walkover, driveway and attached decks on Lot 4, and single family residences with associated dune walkover; driveway and attached decks on Lots 5 and 6. These applications were assigned Application Numbers SJ 220, SJ 221 and SJ 222 by the Division. They were deemed to be complete on August 6, 1985. After evaluating the three applications, the Division formulated recommendations to deny the requested permits. These recommendations were adopted by the Governor and Cabinet sitting as head of the agency at its November 5, 1985 meeting. Notice of such intended action was previously forwarded to petitioner on October 23, 1985. Said notice prompted the instant proceeding. As grounds for denying the permits the Division concluded that the three projects were located seaward of the seasonal high- water line and were therefore prohibited by a law, the projects lay in an area "highly vulnerable" to a major storm; and the cumulative impact of locating these and other structures further seaward could be expected to adversely impact the beach and dune system of the Vilano Beach area. The parties have stipulated that the Division has properly calculated the seasonal high water line in the questioned area, and that petitioner's three projects lie seaward of that line. The parties have also stipulated that the three projects lie seaward of the frontal dune within the meaning of Subsection 161.053t6)(a)1., Florida Statutes (1985).

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that application numbers SJ 220, SJ 221 and SJ 222 filed by Roland Peterson to construct various structures on Lots 4, 5 and 6, Block 7, Vilano Beach in St. Johns County, Florida, be DENIED. DONE and ORDERED this 14th day of May, 1986, in Tallahassee, Florida. DONALD R. ALEXANDER, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of May, 1986.

Florida Laws (2) 120.57161.053
# 7
NORTHERN TRUST BANK OF FLORIDA, N.A., AS PERSONAL REPRESENTATIVE FOR ESTATE OF HOSEA EDWIN BLANTON vs SUSAN NEGELE AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-003613 (1999)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Aug. 26, 1999 Number: 99-003613 Latest Update: Aug. 01, 2000

The Issue The issue is whether Respondent Negele is entitled to a coastal construction control line permit to construct a single- family residence seaward of the coastal construction control line on Anna Maria Island.

Findings Of Fact Respondent Susan Negele (Applicant) owns Lot 10, Block 35, of the First Addition to Anna Maria Beach. Petitioner owns the legal interest in Lots 11 and 12 in the same block. Lot 11 is adjacent to, and landward of, Lot 10, and Lot 12 is adjacent to, and landward of, Lot 11. As platted in 1912, Lot 10 was separated from the Gulf by 360 feet, consisting, from landward to seaward, of two 50-foot lots, an unnamed 10-foot alley, a 100-foot lot, a 50-foot-wide road known as Gulf Boulevard, and about 100 feet of beach (although this feature does not contain a stated distance and the plat map does not indicate the location of the mean or seasonal high water line). According to the plat, running perpendicular to Gulf Boulevard (and the shoreline) are Elm Avenue and another unnamed 10-foot alley. Elm Avenue, which is 50-feet wide, runs along the northwest property line of Lot 10, and the unnamed alley runs along the southeast property line of Lot 10. Today, Lot 10 is the first platted feature landward of the seasonal high water line of the Gulf of Mexico. The record does not reveal whether the platted features seaward of Lot 10 were submerged at the time of the original subdivision or, if not, the process or processes that submerged these three lots, alley, road, and beach. Notwithstanding the clear evidence of the plat map, there is insufficient record evidence on which to base a finding that the mean or seasonal high water line has migrated landward a distance of 360 feet in 88 years. The record is contradictory on the issue of the stability of the beach seaward of Lot 10. On the one hand, as noted below, two rock groins of unknown age on either side of Lot 10 suggest an effort to deter offshore erosion, but the presence of these groins does not support an inference of a diminishing beach. The beach seaward of Lot 10 is included in the Comprehensive Beach Management Plan, which is reserved for beaches that are subject to erosion, but the record does not develop this point adequately. On the other hand, also as noted below, the anecdotal evidence suggests that the beach seaward of Lot 10 has been stable, at least for the past two or three decades. A recent survey, described below, suggests rapid growth in the beach and dune over the past 16 months. Even stronger evidence of the stability of the beach seaward of Lot 10 is its exclusion from the 30-year erosion projection. The record unfortunately does not disclose the proximity of this line to Lot 10, which, if in close proximity, would be important evidence of the condition of a beach and frontal dune system. In sum, the relative stability of the beach in the vicinity of Lot 10 is unclear. However, the exclusion of Lot 10 from the 30-year erosion projection and the anecdotal evidence of stability slightly outweigh the contrary evidence of instability. Applicant's family has owned Lot 10 for 50 years. Originally, they occupied two buildings on Lot 10 that had once served as Coast Guard barracks. At one point, Applicant's father barged the houses up the Manatee River to his father's farm in Palmetto. The record does not reveal whether another building was ever constructed on Lot 10. From an engineering standpoint, Lot 10 is a buildable lot. Applicant seeks the necessary permits to allow residential construction, so as to raise the market value of Lot 10 prior to its sale in order to liquidate this asset following the death of her surviving parent. By application filed with Respondent Department of Environmental Protection (DEP) on June 16, 1997, Applicant requested a coastal construction control line (CCCL) permit to construct a single-family residence on Lot 10. On June 30, 1999, DEP issued a Final Order tentatively granting the permit, but authorizing the construction of a structure with a footprint of only 352 square feet. Finding the allowable footprint insufficient, Applicant challenged the tentative agency action in DOAH Case No. 99-3913. Finding even a 352-square-foot footprint objectionable, Petitioner also challenged the tentative agency action in DOAH Case No. 99-3613. The Administrative Law Judge consolidated the two cases. Agency action in cases of this type is necessarily tentative because it is subject to administrative challenge, which, once resolved, allows final agency action to take place. However, the tentative agency action in this case is tentative in another important respect. DEP has approached the permitting decision in this case through a bifurcated process. DEP has issued a Final Order approving the proposed activity in concept, but has withheld issuing a Notice to Proceed, which is necessary before construction may commence. DEP has withheld issuing the Notice to Proceed until it receives more detailed plans for grading and revegetating the dune and it determines that these plans adequately address the protection of the beach and dune system. As noted below, the bifurcated permitting process defers DEP's examination of detailed grading and revegetation plans until after its issuance of the Final Order. DEP's expert testified that DEP provides a point of entry to challenge final orders, but not notices to proceed. (Tr., p. 174.) The expert testified that DEP would provide another point of entry concerning the proposed activity, but only if DEP were to issue another final order, such as for a "major modification" of the project (Tr., p. 174). But nothing in the record suggests that DEP will be issuing another final order following it's receipt of the more detailed grading and revegetation plans, whose approval by DEP is not subject to administrative challenge (absent successful judicial action to force DEP to provide another point of entry). (The record does not reveal whether DEP would provide Applicant with another point of entry if DEP were to disapprove the more detailed plans and decline to issue the Notice to Proceed.) The absence of an agency-recognized point of entry to challenge the detailed plans means that the analysis necessary to make the determinations required by law concerning the impacts of the proposed activities must be limited to the Permit, as it presently exists, and these determinations may not rely upon additional protections that may be supplied by more detailed plans that are not yet in existence. DEP and Applicant settled DOAH Case No. 99-3913 shortly prior to the final hearing. The settlement stipulation incorporates a new site plan showing the proposed residence moved landward so that it is seven feet landward of the vegetation line, but setback only three feet from the northeast property line (adjoining Lot 11) and five feet from the southeast property line (adjoining the alley). DEP approved the settlement on or about March 17, 2000. By letter dated March 22, 2000, DEP's counsel advised Applicant's counsel that DEP would announce at the final hearing that "it intends to issue the [Permit] . . . in accordance with the agreed location in [the revised site plan] and all other applicable conditions of the June 29, 1999, final order and June 30, 1999, letter from [DEP] to Charles Rose." The CCCL permit is dated June 29, 1999, and expires on June 29, 2002. References to the "Permit" shall include the subsequent modifications that resulted in the settlement of DOAH Case No. 99-3913 and the modifications described below. Petitioner objected to all evidence and any express or implied amendment of the pleadings at the final hearing to encompass subsequent Permit modifications, but the Administrative Law Judge overruled these objections. The Permit authorizes Respondent to conduct activities in a location that is seaward of the CCCL, but landward of the 30-year erosion projection and the existing line of construction established by major structures in the immediate area. According to the survey dated October 15, 1998, and architect's plans dated November 12, 1998, the residence to be constructed would be an elevated two-story frame structure, over a concrete pad, with a footprint of 952 square feet. The proposed structure would be similar in size and character to other residences in the area. A registered architect has signed and sealed all relevant construction plans. For the purpose of this recommended order, the seaward side of Lot 10 is its 110-foot side facing the southwest. This southwest property line runs from the west corner to the south corner of Lot 10. The north and east corners mark the 110-foot side of Lot 10 that abuts Lot 11; this is the northeast property line. As already noted, the two 50-foot sides of Lot 10 abut Elm Avenue and the unnamed 10-foot alley. As it exists in the ground, Elm Avenue is a strip of pavement 17 feet wide located in the middle of the 50-foot wide platted right-of-way. At present, the paved portion of Elm Avenue does not extend seaward of the midpoint of Lot 11. Applicant proposes the construction of a shell drive between the Elm Avenue right-of-way and the north corner of Lot 10, but this proposed activity is not the subject of the present case. The road right-of-way immediately adjacent to Lot 10 was occupied by a 60-foot wooden access walkway extending from the end of the road seaward, between the rock groin and the northwest line of Lot 10. However, this walkway was removed in the past couple of years. At present, the rock groin parallel to the northwest line of Lot 10 occupies the center of the road right-of-way, extending from Lot 10's midpoint, which is landward of the seasonal high water line, to a point seaward of mean sea level. Another rock groin runs from the unnamed alley along the southeast line of Lot 10, also from a point just landward of the seasonal high water line, and extends seaward of mean sea level. Running parallel to the two 50-foot lot lines of Lot 10 and perpendicular to the shoreline, these two rock groins may offer some protection from erosion by affecting sand traveling offshore, but do not otherwise directly offer any protection to the beach and dune system. As established by Applicant, landward from the Gulf, relevant natural features are located as follows. Mean sea level, which is 0.00 feet National Geodetic Vertical Datum (NGVD), is over 50 feet seaward of the west corner of Lot 10 and over 100 feet seaward of the south corner of Lot 10. Mean high water, which is 1.2 feet NGVD, is 35 feet seaward of the west corner of Lot 10 and about 75 feet seaward the south corner of Lot 10. Seasonal high water, which is 3.63 feet NGVD, is about 10 feet landward of the west corner of Lot 10 and about 25 feet seaward of the south corner of Lot 10. About 15-20 square feet of the relatively low west side of Lot 10 is submerged at seasonal high water. In two respects, Petitioner's survey, which was dated March 25, 2000, establishes that, at least for the past 16 months, the beach and dune system is flourishing, not eroding. First, mean high water is now farther from Lot 10 than it was in late 1998. In the intervening 16 months, the mean high water line has migrated to a point 77 feet seaward of the west corner of Lot 10--a distance of 37 feet in less than one and one- half years. During the same period, the mean high water line has migrated from 75 feet to 102 feet--a distance of 27 feet--seaward of the south corner of Lot 10. Second, the newer survey reveals that the seven-foot contour, which is shown on Applicant's survey as a small area at the midpoint of the southeast lot line, now extends across the southeastern two-thirds of the central portion of the lot. It is difficult to estimate from the surveys, but the area of at least seven-foot elevation appears to be six or seven times larger than it was 16 months ago, although a very small area of eight-foot elevation shown on Applicant's survey appears to have disappeared. Both surveys show that the six-foot contour line roughly bisects Lot 10 diagonally from the north to the south corners. Evidence of beach stability supplied from the March 2000 survey is reinforced by anecdotal testimony that the beach at this location has been stable for at least 20 years. In general, the beach at this location is not as dynamic as beaches found elsewhere in Florida. The CCCL is about 259 feet landward of the north corner of Lot 10 and about 222 feet landward of the east corner of Lot The CCCL is landward of Petitioner's Lots 11 and 12, as well as the next two 50-foot wide lots and nearly the entirety of Gulf Drive (Snapper Street on the plat) adjoining this block. According to Applicant's survey, the seaward toe of the frontal dune runs roughly along the seaward six-foot contour, perhaps 10 feet seaward of this contour at the west corner and a perhaps five feet landward of this contour at the south corner. The vegetation line runs 3-5 feet landward of the surveyed seaward toe of the dune. According to Applicant's survey, the frontal dune continues over the landward half of Lot 10, excluding only a 10-square-foot area at the east corner and extending well across the southeastern line of Lot 11, so as to capture about one-fifth of that lot. However, the surveys do not support an independent determination of the toes of the frontal dune or, thus, its width. DEP's expert testified that the landward toe of the dune is probably landward of the surveyed location. Also, the scale of the surveys did not facilitate analysis of subtle changes in slope, which would be indicative of the toes of a low frontal dune, such as is involved in this case. DEP's expert opined that a maximum elevation of seven or eight feet NGVD meant, at this general location, that the toes would probably be at the five- foot contours. If so, the seaward toe would be about 10-15 feet seaward of its surveyed location, and the landward toe would be at an undetermined location landward of Lot 10. Several dynamic processes underlie the beach and frontal dune system. Perhaps most obviously, plants rooted in a dune capture sand and, thus, add to the size of a dune. The absence of such plants facilitates a reduction in dune size. The stability of a dune is also affected by the slopes of its seaward and landward sides and the size of the grains of sand constituting the dune. When restoring a dune, adherence to historic slopes and elevations enhances the possibility of a successful dune restoration. Deviation from these slopes and elevations raises the risk of failure. The same is true regarding the size and characteristics of the grains of sand used to restore a dune. Another factor important in dune stability, as well as upland protection, is the continuity of the dune. A shorter dune, in terms of its length running parallel to the shoreline, is less stable and obviously offers less landward protection than a longer dune. As originally proposed, Respondent's home would occupy the east corner of Lot 10. The southwest side of the residence (facing the Gulf) would have been about one foot seaward of the vegetation line and only one to two feet landward of the surveyed seaward toe of the frontal dune. The landward side of the residence would have been 10 feet seaward of the northeast side of Lot 10. The proposed home would have been setback 10 feet from the northeast and southeast property lines. Shortly prior to the commencement of the hearing, Applicant modified the proposed plans, and DEP modified the Permit. These changes would relocate the proposed residence so that it was seven feet landward of the vegetation line, but setback only three feet from the northeast line and five feet from the southeast line. Despite its relocation landward from its original proposed location, the entire residence would occupy the frontal dune. More specifically, the residence would sit on the seaward side of the frontal dune. The Permit imposes a number of special conditions upon the construction of Respondent's residence. Consistent with DEP's bifurcation of the permitting process in this case, these special conditions prohibit the commencement of construction until Respondent submits plans and specifications "includ[ing] or reflect[ing] the following:" 1.1 A revised site plan including the distances relative to coastal construction control line to all the authorized structures with dimensions. The revised site plan shall depict the dwelling relocated to within 3 feet of the upland lot line and not exceeding a distance of 244 feet seaward. * * * 1.5 A revised grading plan depicting the restored dune extending across the entire parcel with a minimum crest elevation of +7.0 feet (NGVD). * * * The fill material shall be obtained from a source landward of the control line and shall consist of sand which is similar to that already on the site in both grain size and coloration. This fill material shall be free of construction debris, rocks, or other foreign matter. A sample of the sand shall be provided to the staff representative during the preconstruction conference. All permanent exterior lighting shall be installed and maintained as depicted in approved lighting schematic. No additional exterior lighting is authorized. CAVEAT: Due to potential adverse impacts to the beach and dune system that may result from additional development on the property, the shore-parallel and seaward extent of the permitted structures shall not be increased, nor will any additional major structures be permitted which would exceed the limits established by the permitted construction seaward of the coastal construction control line. The present proposed location of the residence is not landward of a line running 244 feet seaward of the CCCL. Roughly one-third of the proposed residence would be seaward of this line, which is set forth in the Permit. Addressing the obvious conflict between the restriction contained in Permit Paragraph 1.1 prohibiting any structure seaward of a point 244 feet seaward of the CCCL and its approval of the new location for the residence, DEP announced at the hearing a new Permit Paragraph 1.1, which reads: The revised site plan shall depict the dwelling relocated within three feet of the upland lot line and not exceeding a distance of 250 feet seaward of the CCCL on the southwest corner and 255 feet seaward of the CCCL on the northwest corner. (Tr., pp. 119-20.) The revised site plan clarifies that the reference to "three feet" means the three-foot setback on the northeast lot line. The references to the southwest and northwest corners are, respectively, to the southernmost corner, which, when used with respect to Lot 10 in this recommended order, is described as the south corner, and the westernmost corner, which, when used with respect to Lot 10 in this recommended order, is described as the west corner. (For ease of reference at the hearing, counsel, the witnesses, and Administrative Law Judge reoriented Lot 10 by referring to the southwest lot line as the west lot line and treating the Gulf, which is southwest of Lot 10, as though it were due west of Lot 10.) At present, Applicant has submitted no grading plans, which would address the seaward toe of the frontal dune after construction. The landward toe is not on Applicant's property, so Applicant will not be able to change the slope of the landward side of the dune by adding sand to the portion of this dune not contained within Lot 10. As identified to this point, the Permit's requirements for dune restoration are sketchy, reliant upon more detailed grading plans that are not yet in existence. Permit Paragraph 5 adequately specifies the grain size. However, the Permit fails to specify the slopes, leaving this crucial element of the dune to the more detailed grading plans. Under the Permit, Applicant would be required to supply a specified volume of sand to the site. This volume was calculated to be sufficient, based on Applicant's survey, to raise the portion of the dune northwest of the seven-foot contour to an elevation of seven feet NGVD. However, if Petitioner's survey is correct, much less sand will be needed to raise the elevation to seven feet NGVD, so the "excess" sand will widen the dune. This recommended order has credited both surveys, so Applicant's survey provides the relevant details except for the more recent information supplied by Petitioner's survey concerning the locations of the mean high water line and the seven-foot contour. The widening of the dune authorized by the Final Order necessarily changes the dune's profile by extending the seaward toe closer to the shoreline and probably changes the slope of the seaward toe of the dune. Additionally, raising the elevation of the dune in the northeastern portion of Lot 10 will dramatically change its landward profile, given the fact that Applicant cannot add sand to the large portion of the dune landward of Lot 10. The effects of these alterations of the dune profile are entirely unknown to Applicant and DEP. Failing to perform the preliminary tasks of locating the existing dimensions of the dune--in terms of its width (perpendicular to the shoreline) and its length (parallel to the shoreline)-- Applicant and DEP lacked the baseline data upon which they could then analyze the construction and post-construction effects of placing Applicant's residence atop this dune. The present stability of the beach and dune system at Lot 10 does not dispense with the necessity of such analysis in making the determinations required by the relevant law. Additionally, the Permit fails to address the revegetation of the dune, again leaving this issue to more detailed plans not yet in existence. Specifically, Applicant has submitted no plans establishing a replanting scheme with specified species at specified distances, criteria by which to measure the success of the revegetation process (e.g., X percent coverage after one year), and a monitoring and enforcement program. Lastly, although the City of Anna Maria issued a letter approving of the proposed plans when Applicant proposed ten-foot setbacks, the City of Anna Maria has not had a chance to comment upon the proposal of three- and five-foot setbacks. Land use regulations of the City of Anna Maria require greater setbacks than these. As distinguished from its treatment of the dune profile and vegetation, the Permit supplies ample assurances that the proposed activities would be conducted in such a way as not to disturb nesting sea turtles, which, according to the record, infrequently occupy this specific location. Permit provisions, such as those scheduling construction and governing construction and post-construction lighting, adequately address the relatively simple task of protecting this lightly used nesting habitat.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order denying the application for a coastal construction control line permit to construct a residence at the location indicated at the hearing. DONE AND ENTERED this 13th day of June, 2000, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of June, 2000. COPIES FURNISHED: Kathy Carter, Agency Clerk Office of the General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri Donaldson, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Adam Mohammadbhoy Harllee Porges Post Office Box 9320 Bradenton, Florida 34205 S.W. Moore Brigham Moore 100 Wallace Avenue, Suite 310 Sarasota, Florida 34237 Francine M. Ffolkes Senior Assistant General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-9314

Florida Laws (2) 120.57161.053 Florida Administrative Code (5) 62B -33.00562B -33.00862B-33.00262B-33.00562B-33.008
# 9
THOMAS R. SWEENEY vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-003116 (1997)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Jul. 09, 1997 Number: 97-003116 Latest Update: Oct. 21, 1998

The Issue The issue is whether Petitioner's after-the-fact modification application for construction activities seaward of the coastal construction control line in New Smyrna Beach, Florida, should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: In 1984, Petitioner, Thomas R. Sweeney, purchased a home at 5917 South Atlantic Drive, New Smyrna Beach, Florida. At that time, the home was approximately 3,000 square feet in size. The home sits seaward of the coastal construction control line (CCCL) and thus any construction activities on the premises require the issuance of a CCCL permit from Respondent, Department of Environmental Protection (DEP). In 1987, Petitioner constructed a first floor porch, second story addition, and wooden deck at the site without first applying for and obtaining a CCCL permit from the Department of Natural Resources, which was subsequently merged with DEP. After the construction was completed, Petitioner submitted an after-the-fact application for a CCCL permit for those structures. Before being issued Permit Number VO-423, Petitioner was required to pay an administrative fine. Among other things, Permit VO-423 approved an already constructed wooden deck on the eastern side of the home which approximated 840 square feet in size. Petitioner was also given approval for a wooden walkway with stairs that provided access to the beach. On June 1, 1995, Petitioner filed a second CCCL application with DEP to add a 20-foot first and second story addition with a deck to the south side of the home. After reviewing the application, on November 9, 1995, DEP issued CCCL Permit Number VO-627 authorizing the scope of work identified in the permit application documents. Notwithstanding the limited amount of work authorized by the permit, Petitioner constructed a third story addition to his home. He also removed the original wooden deck on the eastern side of the home, and he constructed spread footers and a foundation on top of the rock revetment for a new and much larger deck. The new deck is approximately 2,100 square feet, or more than 1,200 square feet larger than the original permitted deck. In its present state, the home is approximately 5,600 square feet, and the existing eastern deck is larger than any permitted deck on any other single-family home in Volusia County. On September 9, 1996, DEP discovered the third story addition and the much larger wooden deck with appurtenant structures. Presumedly at the behest of DEP, on November 22, 1996, Petitioner submitted an application for an after-the-fact modification of CCCL Permit Number VO-627 to authorize the previously completed, unauthorized work. On April 23, 1997, DEP issued CCCL Permit Number VO-627 After-the-Fact. The permit approved the third-story addition to the home together with a 10-foot wide wooden deck on the seaward side of the entire third story and a 12-foot wide wooden deck on the landward side of the third story. DEP denied, however, authorization for Petitioner's new wooden deck on the first floor with a tiki hut and sundeck on the ground those structures violated Rule 62B-33.005(4)(e), Florida Administrative Code. That rule requires that any new construction seaward of the CCCL "minimize the potential for wind and waterborne missiles during a storm." The issuance of the proposed agency action prompted Petitioner to initiate this proceeding. On November 3, 1997, DEP entered a Final Order directing Petitioner to pay a fine because he illegally constructed structures seaward of the CCCL. The order was never appealed, and thus the time to challenge the order has elapsed. As of the date of hearing, Petitioner had not paid the fine, and a statutory lien has been placed on the property. The Storm Surge Elevation at this site for a 100-year storm event is 10.7 feet N.G.V.D. The Breaking Wave Crest- Elevation for a 100-year storm event at this site is 14.9 feet N.G.V.D. Part of the new eastern deck is located below an elevation of 14.9 feet N.G.V.D. The builder who constructed the additions, Edward Robinson, characterized them as "above average to superior" in quality. To minimize the possibility of the deck washing away during a storm event, he used the "best" nails, bolts, and concrete available. In addition, the new decking was rested upon concrete footers for support. The footers, however, are on top of a rock revetment, and Robinson conceded that such footers are not as stable as a pile foundation. Petitioner used coquina rock (with a low unit weight) for his revetment. It was established that the rocks on which the footers rest are not permanent, and they can shift during a large storm event. In fact, shifting can occur even during a ten-year storm, and there will be a total failure of the revetment during a thirty-year storm event. Once the stones move, an erosion process begins, and the deck will fail. The accompanying high winds will then lift the wooden debris in an airborne fashion. Depending on the strength of the storm, the airborne debris will be a threat not only to Petitioner, but also to his neighbors. Therefore, it is found that the existing construction for the eastern deck does not minimize the potential for wind and waterborne missiles during a storm, and it thus violates Rule 62B-33.005(4)(e), Florida Administrative Code, as alleged in the proposed agency action denying in part the permit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a Final Order denying Petitioner's application for an after-the-fact amended CCCL permit to construct an expanded eastern deck with a tiki hut and sun deck on his property at 5917 South Atlantic Avenue, New Smyrna Beach, Florida, and approving the application for the structures previously authorized by the Department in its Final Order issued on April 24, 1997. DONE AND ENTERED this 11th day of May, 1998, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 1998. COPIES FURNISHED: Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Thomas H. Dale, Esquire Post Office Box 14 Orlando, Florida 32802 Thomas I. Mayton, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 F. Perry Odom, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (3) 120.569120.57161.053 Florida Administrative Code (1) 62B-33.005
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer