TRUSTEES OF MEASE HOSPITAL, INC. vs AGENCY FOR HEALTH CARE ADMINISTRATION AND MORTON PLANT HOSPITAL ASSOCIATION, INC., D/B/A NORTH BAY HOSPITAL, 02-003237CON (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 14, 2002 Number: 02-003237CON Latest Update: May 17, 2004

The Issue Whether the certificate of need (CON) applications filed by New Port Richey Hospital, Inc., d/b/a Community Hospital of New Port Richey (Community Hospital) (CON No. 9539), and Morton Plant Hospital Association, Inc., d/b/a North Bay Hospital (North Bay) (CON No. 9538), each seeking to replace and relocate their respective general acute care hospital, satisfy, on balance, the applicable statutory and rule criteria.

Findings Of Fact The Parties AHCA AHCA is the single state agency responsible for the administration of the CON program in Florida pursuant to Chapter 408, Florida Statutes (2000). The agency separately reviewed and preliminarily approved both applications. Community Hospital Community Hospital is a 300,000 square feet, accredited hospital with 345 licensed acute care beds and 56 licensed adult psychiatric beds, located in southern New Port Richey, Florida, within Sub-District 5-1. Community Hospital is seeking to construct a replacement facility approximately five miles to the southeast within a rapidly developing suburb known as "Trinity." Community Hospital currently provides a wide array of comprehensive inpatient and outpatient services and is the only provider of obstetrical and adult psychiatric services in Sub-District 5-1. It is the largest provider of emergency services in Pasco County with approximately 35,000 visits annually. It is also the largest provider of Medicaid and indigent patient days in Sub-District 5-1. Community Hospital was originally built in 1969 and is an aging facility. Although it has been renovated over time, the hospital is in poor condition. Community Hospital's average daily census is below 50 percent. North Bay North Bay is a 122-bed facility containing 102 licensed acute care beds and 20 licensed comprehensive medical rehabilitation beds, located approximately one mile north of Community Hospital in Sub-District 5-1. It serves a large elderly population and does not provide pediatric or obstetrical care. North Bay is also an aging facility and proposes to construct a replacement facility in the Trinity area. Notably, however, North Bay has spent approximately 12 million dollars over the past three years for physical improvements and is in reasonable physical condition. Helen Ellis Helen Ellis is an accredited hospital with 150 licensed acute care beds and 18 licensed skilled nursing unit beds. It is located in northern Pinellas County, approximately eight miles south of Community Hospital and nine miles south of North Bay. Helen Ellis provides a full array of acute care services including obstetrics and cardiac catheterization. Its daily census average has fluctuated over the years but is approximately 45 percent. Mease Mease operates two acute care hospitals in Pinellas County including Mease Dunedin Hospital, located approximately 18 to 20 miles south of the applicants and Mease Countryside Hospital, located approximately 16 to 18 miles south of Community and North Bay. Each hospital operates 189 licensed beds. The Mease hospitals are located in the adjacent acute care sub-district but compete with the applicants. The Health Planning District AHCA's Health Planning District 5 consists of Pinellas and Pasco Counties. U.S. Highway 41 runs north and south through the District and splits Pasco County into Sub- District 5-1 and Sub-District 5-2. Sub-District 5-1, where Community Hospital and North Bay are located, extends from U.S. 41 west to the Gulf Coast. Sub-District 5-2 extends from U.S. 41 to the eastern edge of Pasco County. Pinellas County is the most densely populated county in Florida and steadily grows at 5.52 percent per year. On the other hand, its neighbor to the north, Pasco County, has been experiencing over 15 percent annual growth in population. The evidence demonstrates that the area known as Trinity, located four to five miles southeast of New Port Richey, is largely responsible for the growth. With its large, single- owner land tracts, Trinity has become the area's fuel for growth, while New Port Richey, the older coastal anchor which houses the applicants' facilities, remains static. In addition to the available land in Trinity, roadway development in the southwest section of Pasco County is further fueling growth. For example, the Suncoast Highway, a major highway, was recently extended north from Hillsborough County through Sub-District 5-1, west of U.S. 41. It intersects with several large east-west thoroughfares including State Road 54, providing easy highway access to the Tampa area. The General Proposals Community Hospital's Proposal Community Hospital's CON application proposes to replace its existing, 401-bed hospital with a 376-bed state- of-the-art facility and relocate it approximately five miles to the southeast in the Trinity area. Community Hospital intends to construct a large medical office adjacent to its new facility and provide all of its current services including obstetrical care. It does not intend to change its primary service area. North Bay's Proposal North Bay's CON application proposes to replace its existing hospital with a 122-bed state-of-the-art facility and also plans to relocate it approximately eight miles to the southeast in the Trinity area of southwestern Pasco County. North Bay intends to provide the same array of services it currently offers its patients and will not provide pediatric and obstetrical care in the proposed facility. The proposed relocation site is adjacent to the Trinity Outpatient Center which is owned by North Bay's parent company, Morton Plant. The Outpatient Center offers a full range of diagnostic imaging services including nuclear medicine, cardiac nuclear stress testing, bone density scanning, CAT scanning, mammography, ultrasound, as well as many others. It also offers general and specialty ambulatory surgical services including urology; ear, nose and throat; ophthalmology; gastroenterology; endoscopy; and pain management. Approximately 14 physician offices are currently located at the Trinity Outpatient Center. The Condition of Community Hospital Facility Community Hospital's core facilities were constructed between 1969 and 1971. Additions to the hospital were made in 1973, 1975, 1976, 1977, 1979, 1981, 1992, and 1999. With an area of approximately 294,000 square feet and 401 licensed beds, or 733 square feet per bed, Community Hospital's gross area-to-bed ratio is approximately half of current hospital planning standards of 1,600 square feet per bed. With the exception of the "E" wing which was completed in 1999, all of the clinical and support departments are undersized. Medical-Surgical Beds And Intensive Care Units Community Hospital's "D" wing, constructed in 1975, is made up of two general medical-surgical unit floors which are grossly undersized. Each floor operates 47 general medical-surgical beds, 24 of which are in three-bed wards and 23 in semi-private rooms. None of the patient rooms in the "D" wing have showers or tubs so the patients bathe in a single facility located at the center of the wing on each floor. Community Hospital's "A" wing, added in 1973, is situated at the west end of the second floor and is also undersized. It too has a combination of semi-private rooms and three-bed wards without showers or tubs. Community Hospital's "F" wing, added in 1979, includes a medical-surgical unit on the second and third floor, each with semi-private and private rooms. The second floor unit is centrally located between a 56-bed adult psychiatric unit and the Surgical Intensive Care Unit (SICU) which creates security and privacy issues. The third floor unit is adjacent to the Medical Intensive Care Unit (MICU) which must be accessed through the medical-surgical unit. Neither intensive care unit (ICU) possesses an isolation area. Although the three-bed wards are generally restricted to in-season use, and not always full, they pose significant privacy, security, safety, and health concerns. They fail to meet minimum space requirements and are a serious health risk. The evidence demonstrates that reconfiguring the wards would be extremely costly and impractical due to code compliance issues. The wards hinder the hospital's acute care utilization, and impair its ability to effectively compete with other hospitals. Surgical Department and Recovery Community Hospital's surgical department is separated into two locations including the main surgical suite on the second floor and the Endoscopy/Pain Management unit located on the first floor of "C" wing. Consequently, the department cannot share support staff and space such as preparation and recovery. The main surgical suite, adjacent recovery room, and central sterile processing are 25 years old. This unit's operating rooms, cystoscopy rooms, storage areas, work- stations, central sterile, and recovery rooms are undersized and antiquated. The 12-bay Recovery Room has no patient toilet and is lacking storage. The soiled utility room is deficient. In addition, the patient bays are extremely narrow and separated by curtains. There is no direct connection to the sterile corridor, and staff must break the sterile field to transport patients from surgery to recovery. Moreover, surgery outpatients must pass through a major public lobby going to and returning from surgery. The Emergency Department Community Hospital's existing emergency department was constructed in 1992 and is the largest provider of hospital emergency services in Pasco County, handling approximately 35,000 visits per year. The hospital is also designated a "Baker Act" receiving facility under Chapter 394, Florida Statutes, and utilizes two secure examination rooms for emergent psychiatric patients. At less than 8,000 total square feet, the emergency department is severely undersized to meet the needs of its patients. The emergency department is currently undergoing renovation which will connect the triage area to the main emergency department. The renovation will not enlarge the entrance, waiting area, storage, nursing station, nor add privacy to the patient care areas in the emergency department. The renovation will not increase the total size of the emergency department, but in fact, the department's total bed availability will decrease by five beds. Similar to other departments, a more meaningful renovation cannot occur within the emergency department without triggering costly building code compliance measures. In addition to its space limitations, the emergency department is awkwardly located. In 1992, the emergency department was relocated to the front of the hospital and is completely separated from the diagnostic imaging department which remained in the original 1971 building. Consequently, emergency patients are routinely transported across the hospital for imaging and CT scans. Issues Relating to Replacement of Community Hospital Although physically possible, renovating and expanding Community Hospital's existing facility is unreasonable. First, it is cost prohibitive. Any significant renovation to the 1971, 1975, 1977, and 1979 structures would require asbestos abatement prior to construction, at an estimated cost of $1,000,000. In addition, as previously noted, the hospital will be saddled with the major expense of complying with all current building code requirements in the 40-year-old facility. Merely installing showers in patient rooms would immediately trigger a host of expensive, albeit necessary, code requirements involving access, wiring, square footage, fireproofing columns and beams, as well as floor/ceiling and roof/ceiling assemblies. Concurrent with the significant demolition and construction costs, the hospital will experience the incalculable expense and loss of revenue related to closing major portions, if not all, of the hospital. Second, renovation and expansion to the existing facility is an unreasonable option due to its physical restrictions. The 12'4" height of the hospital's first floor limits its ability to accommodate HVAC ductwork large enough to meet current ventilation requirements. In addition, there is inadequate space to expand any department within the confines of the existing hospital without cannibalizing adjacent areas, and vertical expansion is not an option. Community Hospital's application includes a lengthy Facility Condition Assessment which factually details the architectural, mechanical, and electrical deficiencies of the hospital's existing physical plant. The assessment is accurate and reasonable. Community Hospital's Proposed Replacement Community Hospital proposes to construct a six- story, 320 licensed beds, acute care replacement facility. The hospital will consist of 548,995 gross square feet and include a 56-bed adult psychiatric unit connected by a hallway to the first floor of the main hospital building. The proposal also includes the construction of an adjacent medical office building to centralize the outpatient offices and staff physicians. The evidence establishes that the deficiencies inherent in Community Hospital's existing hospital will be cured by its replacement hospital. All patients will be provided large private rooms. The emergency department will double in size, and contain private examination rooms. All building code requirements will be met or exceeded. Patients and staff will have separate elevators from the public. In addition, the surgical department will have large operating rooms, and adequate storage. The MICU and SICU will be adjacent to each other on the second floor to avoid unnecessary traffic within the hospital. Surgical patients will be transported to the ICU via a private elevator dedicated to that purpose. Medical-surgical patient rooms will be efficiently located on the third through sixth floors, in "double-T" configuration. Community Hospital's Existing and Proposed Sites Community Hospital is currently located on a 23-acre site inside the southern boundary of New Port Richey. Single- family homes and offices occupy the two-lane residential streets that surround the site on all sides. The hospital buildings are situated on the northern half of the site, with the main parking lot located to the south, in front of the main entrance to the hospital. Marine Parkway cuts through the southern half of the site from the west, and enters the main parking lot. A private medical mall sits immediately to the west of the main parking lot and a one-acre storm-water retention pond sits to the west of the mall. A private medical office building occupies the south end of the main parking lot and a four-acre drainage easement is located in the southwest corner of the site. Community Hospital's administration has actively analyzed its existing site, aging facility, and adjacent areas. It has commissioned studies by civil engineers, health care consultants, and architects. The collective evidence demonstrates that, although on-site relocation is potentially an option, on balance, it is not a reasonable option. Replacing Community Hospital on its existing site is not practical for several reasons. First, the hospital will experience significant disruption and may be required to completely close down for a period of time. Second, the site's southwestern large four-acre parcel is necessary for storm-water retention and is unavailable for expansion. Third, a reliable cost differential is unknown given Community Hospital's inability to successfully negotiate with the city and owners of the adjacent medical office complexes to acquire additional parcels. Fourth, acquiring other adjacent properties is not a viable option since they consist of individually owned residential lots. In addition to the site's physical restrictions, the site is hindered by its location. The hospital is situated in a neighborhood between small streets and a local school. From the north and south, motorists utilize either U.S. 19, a congested corridor that accommodates approximately 50,000 vehicles per day, or Grand and Madison Streets, two-lane streets within a school zone. From the east and west, motorists utilize similar two-lane neighborhood streets including Marine Parkway, which often floods in heavy rains. Community Hospital's proposed site, on the other hand, is a 53-acre tract positioned five miles from its current facility, at the intersection of two major thoroughfares in southwestern Pasco County. The proposed site offers ample space for all facilities, parking, outpatient care, and future expansion. In addition, Community Hospital's proposed site provides reasonable access to all patients within its existing primary service area made up of zip codes 34652, 34653, 34668, 34655, 34690, and 34691. For example, the average drive times from the population centers of each zip code to the existing site of the hospital and the proposed site are as follows: Zip code Difference Existing site Proposed site 34652 3 minutes 14 minutes 11 minutes 34653 8 minutes 11 minutes 3 minutes 34668 15 minutes 21 minutes 6 minutes 34655 11 minutes 4 minutes -7 minutes 34690 11 minutes 13 minutes 2 minutes 34691 11 minutes 17 minutes 6 minutes While the average drive time from the population centroids of zip codes 34653, 34668, 34690, and 34691 to the proposed site slightly increases, it decreases from the Trinity area, where population growth has been most significant in southwestern Pasco County. In addition, a motorist's average drive time from Community Hospital's existing location to its proposed site is only 10 to 11 minutes, and patients utilizing public transportation will be able to access the new hospital via a bus stop located adjacent to the proposed site. The Condition of North Bay Facility North Bay Hospital is also an aging facility. Its original structure and portions of its physical plant are approximately 30 years old. Portions of its major mechanical systems will soon require replacement including its boilers, air handlers, and chillers. In addition, the hospital is undersized and awkwardly configured. Despite its shortcomings, however, North Bay is generally in good condition. The hospital has been consistently renovated and updated over time and is aesthetically pleasing. Moreover, its second and third floors were added in 1986, are in good shape, and structurally capable of vertical expansion. Medical Surgical Beds and ICU Units By-in-large, North Bay is comprised of undersized, semi-private rooms containing toilet and shower facilities. The hospital does not have any three-bed wards. North Bay's first floor houses all ancillary and support services including lab, radiology, pharmacy, surgery, pre-op, post-anesthesia recovery, central sterile processing and supply, kitchen and cafeteria, housekeeping and administration, as well as the mechanical, electrical, and facilities maintenance and engineering. The first floor also contains a 20-bed CMR unit and a 15-bed acute care unit. North Bay's second and third floors are mostly comprised of semi-private rooms and supporting nursing stations. Although the rooms and stations are not ideally sized, they are in relatively good shape. North Bay utilizes a single ICU with ten critical care beds. The ICU rooms and nursing stations are also undersized. A four-bed ICU ward and former nursery are routinely used to serve overflow patients. Surgery Department and Recovery North Bay utilizes a single pre-operative surgical room for all of its surgery patients. The room accommodates up to five patient beds, but has limited space for storage and pre-operative procedures. Its operating rooms are sufficiently sized. While carts and large equipment are routinely stored in hallways throughout the surgical suite, North Bay has converted the former obstetrics recovery room to surgical storage and has made efficient use of other available space. North Bay operates a small six-bed Post Anesthesia Care Unit. Nurses routinely prepare patient medications in the unit which is often crowded with staff and patients. The Emergency Department North Bay has recently expanded its emergency department. The evidence demonstrates that this department is sufficient and meets current and future expected patient volumes. Replacement Issues Relating to North Bay While it is clear that areas of North Bay's physical plant are aging, the facility is in relatively good condition. It is apparent that North Bay must soon replace significant equipment, including cast-iron sewer pipes, plumbing, boilers, and chillers which will cause some interruption to hospital operations. However, North Bay's four-page written assessment of the facility and its argument citing the need for total replacement is, on balance, not persuasive. North Bay's Proposed Replacement North Bay proposes to construct a new, state-of-the- art, hospital approximately eight miles southeast of its existing facility and intends to offer the identical array of services the hospital currently provides. North Bay's Existing and Proposed Sites North Bay's existing hospital is located on an eight-acre site with limited storm-water drainage capacity. Consequently, much of its parking area is covered by deep, porous, gravel instead of asphalt. North Bay's existing site is generally surrounded by residential properties. While the city has committed, in writing, it willingness to assist both applicants with on-site expansion, it is unknown whether North Bay can acquire additional adjacent property. North Bay's proposed site is located at the intersection of Trinity Oaks Boulevard and Mitchell Boulevard, south of Community Hospital's proposed site, and is quite spacious. It contains sufficient land for the facilities, parking, and future growth, and has all necessary infrastructure in place, including utility systems, storm- water structures, and roadways. Currently however, there is no public transportation service available to North Bay's proposed site. Projected Utilization by Applicants The evidence presented at hearing indicates that, statewide, replacement hospitals often increase a provider's acute care bed utilization. For example, Bartow Memorial Hospital, Heart of Florida Regional Medical Center, Lake City Medical Center, Florida Hospital Heartland Medical Center, South Lake Hospital, and Florida Hospital-Fish Memorial each experienced significant increases in utilization following the opening of their new hospital. The applicants in this case each project an increase in utilization following the construction of their new facility. Specifically, Community Hospital's application projects 82,685 total hospital patient days (64,427 acute care patient days) in year one (2006) of the operation of its proposed replacement facility, and 86,201 total hospital patient days (67,648 acute care patient days) in year two (2007). Using projected 2006 and 2007 population estimates, applying 2002 acute care hospital use rates which are below 50 percent, and keeping Community Hospital's acute care market share constant at its 2002 level, it is reasonably estimated that Community Hospital's existing hospital will experience 52,623 acute care patient days in 2006, and 53,451 acute care patient days in 2007. Consequently, Community Hospital's proposed facility must attain 11,804 additional acute care patient days in 2006, and 14,197 more acute care patient days in 2007, in order to achieve its projected acute care utilization. Although Community Hospital lost eight percent of the acute care market in its service area between 1995 and 2002, two-thirds of that loss was due to residents of Sub- District 5-1 acquiring services in another area. While Community Hospital experienced 78,444 acute care patient days in 1995, it projects only 64,427 acute care patient days in year one. Given the new facility and population factors, it is reasonable that the hospital will recapture half of its lost acute care market share and achieve its projections. With respect to its psychiatric unit, Community Hospital projects 16,615 adult psychiatric inpatient days in year one (2006) and 17,069 adult inpatient days in year two (2007) of the proposed replacement hospital. The evidence indicates that these projections are reasonable. Similarly, North Bay's acute care utilization rate has been consistently below 50 percent. Since 1999, the hospital has experienced declining utilization. In its application, North Bay states that it achieved total actual acute care patient days of 21,925 in 2000 and 19,824 in 2001 and the evidence at hearing indicates that North Bay experienced 17,693 total acute care patient days in 2002. North Bay projects 25,909 acute care patient days in the first year of operation of its proposed replacement hospital, and 27,334 acute care patient days in the second year of operation. Despite each applicant's current facility utilization rate, Community Hospital must increase its current acute care patient days by 20 percent to reach its projected utilization, and North Bay must increase its patient days by at least 50 percent. Given the population trends, service mix and existing competition, the evidence demonstrates that it is not possible for both applicants to simultaneously achieve their projections. In fact, it is strongly noted that the applicants' own projections are predicated upon only one applicant being approved and cannot be supported with the approval of two facilities. Local Health Plan Preferences In its local health plan for District 5, the Suncoast Health Council, Inc., adopted acute care preferences in October, 2000. The replacement of an existing hospital is not specifically addressed by any of the preferences. However, certain acute care preferences and specialty care preferences are applicable. The first applicable preference provides that preference "shall be given to an applicant who proposes to locate a new facility in an area that will improve access for Medicaid and indigent patients." It is clear that the majority of Medicaid and indigent patients live closer to the existing hospitals. However, Community Hospital proposes to move 5.5 miles from its current location, whereas North Bay proposes to move eight miles from its current location. While the short distances alone are less than significant, North Bay's proposed location is further removed from New Port Richey, is not located on a major highway or bus-route, and would therefore be less accessible to the medically indigent residents. Community Hospital's proposed site will be accessible using public transportation. Furthermore, Community Hospital has consistently provided excellent service to the medically indigent and its proposal would better serve that population. In 2000, Community Hospital provided 7.4 percent of its total patient days to Medicaid patients and 0.8 percent of its total patient days to charity patients. Community Hospital provided the highest percentage and greatest number of Medicaid patient days in Sub-District 5-1. By comparison, North Bay provided 5.8 percent of its total patient days to Medicaid patients and 0.9 percent of its total patient days to charity patients. In 2002, North Bay's Medicaid patients days declined to 3.56 percent. Finally, given the closeness and available bed space of the existing providers and the increasing population in the Trinity area, access will be improved by Community Hospital's relocation. The second local health plan preference provides that "[i]n cases where an applicant is a corporation with previously awarded certificates of need, preference shall be given to those which follow through in a timely manner to construct and operate the additional facilities or beds and do not use them for later negotiations with other organizations seeking to enter or expand the number of beds they own or control." Both applicants meet this preference. The third local health plan preference recognizes "Certificate of Need applications that provide AHCA with documentation that they provide, or propose to provide, the largest percentage of Medicaid and charity care patient days in relation to other hospitals in the sub-district." Community Hospital provides the largest percentage of Medicaid and charity care patient days in relation to other hospitals in Sub-District 5-1, and therefore meets this preference. The fourth local health plan preference applies to "Certificate of Need applications that demonstrate intent to serve HIV/AIDS infected persons." Both applicants accept and treat HIV/AIDS infected persons, and would continue to do so in their proposed replacement hospitals. The fifth local health plan preference recognizes "Certificate of Need applications that commit to provide a full array of acute care services including medical-surgical, intensive care, pediatric, and obstetrical services within the sub-district for which they are applying." Community Hospital qualifies since it will continue to provide its current services, including obstetrical care and psychiatric care, in its proposed replacement hospital. North Bay discontinued its pediatric and obstetrical programs in 2001, does not intend to provide them in its proposed replacement hospital, and will not provide psychiatric care. Agency Rule Preferences Florida Administrative Code Rule 59C-1.038(6) provides an applicable preference to a facility proposing "new acute care services and capital expenditures" that has "a documented history of providing services to medically indigent patients or a commitment to do so." As the largest Medicaid provider in Sub-District 5-1, Community Hospital meets this preference better than does North Bay. North Bay's history demonstrates a declining rate of service to the medically indigent. Statutory Review Criteria Section 408.035(1), Florida Statutes: The need for the health care facilities and health services being proposed in relation to the applicable district health plan District 5 includes Pasco and Pinellas County. Pasco County is rapidly developing, whereas Pinellas County is the most densely populated county in Florida. Given the population trends, service mix, and utilization rates of the existing providers, on balance, there is a need for a replacement hospital in the Trinity area. Section 408.035(2), Florida Statutes: The availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district of the applicant Community Hospital and North Bay are both located in Sub-District 5-1. Each proposes to relocate to an area of southwestern Pasco County which is experiencing explosive population growth. The other general acute care hospital located in Sub-District 5-1 is Regional Medical Center Bayonet Point, which is located further north, in the Hudson area of western Pasco County. The only other acute care hospitals in Pasco County are East Pasco Medical Center, in Zephyrhills, and Pasco Community Hospital, in Dade City. Those hospitals are located in Sub-District 5-2, east Pasco County, far from the area proposed to be served by either Community Hospital or North Bay. District 5 includes Pinellas County as well as Pasco County. Helen Ellis and Mease are existing hospital providers located in Pinellas County. Helen Ellis has 168 licensed beds, consisting of 150 acute care beds and an 18-bed skilled nursing unit, and is located 7.9 miles from Community Hospital's existing location and 10.8 miles from Community Hospital's proposed location. Access to Helen Ellis for patients originating from southwestern Pasco County requires those patients to travel congested U.S. 19 south to Tarpon Springs. As a result, the average drive time from Community Hospital's existing and proposed site to Helen Ellis is approximately 22 minutes. Helen Ellis is not a reasonable alternative to Community Hospital's proposal. The applicants' proposals are specifically designed for the current and future health care needs of southwestern Pasco County. Given its financial history, it is unknown whether Helen Ellis will be financially capable of providing the necessary care to the residents of southwestern Pasco. Mease Countryside Hospital has 189 licensed acute care beds. It is located 16.0 miles from Community Hospital's existing location and 13.8 miles from Community Hospital's proposed location. The average drive time to Mease Countryside is 32 minutes from Community Hospital's existing site and 24 minutes from its proposed site. In addition, Mease Countryside Hospital has experienced extremely high utilization over the past several years, in excess of 90 percent for calendar years 2000 and 2001. Utilization at Mease Countryside Hospital has remained over 80 percent despite the addition of 45 acute care beds in April 2002. Given the growth and demand, it is unknown whether Mease can accommodate the residents in southwest Pasco County. Mease Dunedin Hospital has 189 licensed beds, consisting of 149 acute care beds, a 30-bed skilled nursing unit, five Level 2 neonatal intensive care beds, and five Level 3 neonatal intensive care beds. Its former 15-bed adult psychiatric unit has been converted into acute care beds. It is transferring its entire obstetrics program at Mease Dunedin Hospital to Mease Countryside Hospital. Mease Dunedin Hospital is located approximately 18 to 20 miles from the applicants' existing and proposed locations with an average drive time of 35-38 minutes. With their remote location, and the exceedingly high utilization at Mease Countryside Hospital, neither of the two Mease hospitals is a viable alternative to the applicants' proposals. In addition, the construction of a replacement hospital would positively impact economic development and further attract medical professionals to Sub-District 5-1. On balance, given the proximity, utilization, service array, and accessibility of the existing providers, including the applicants, the relocation of Community Hospital will enhance access to health care to the residents. Section 408.035(3), Florida Statutes: The ability of the applicant to provide quality of care and the applicant's record of providing quality of care As stipulated, both applicants provide excellent quality of care. However, Community Hospital's proposal will better enhance its ability to provide quality care. Community is currently undersized, non-compliant with today's standards, and located on a site that does not allow for reasonable expansion. Its emergency department is inadequate for patient volume, and the configuration of the first floor leads to inefficiencies in the diagnosis and treatment of emergency patients. Again, most inpatients are placed in semi-private rooms and three-bed wards, with no showers or tubs, little privacy, and an increased risk of infection. The hospital's waiting areas for families of patients are antiquated and undersized, its nursing stations are small and cramped and the operating rooms and storage facilities are undersized. Community Hospital's deficiencies will be effectively eliminated by its proposed replacement hospital. As a result, patients will experience qualitatively better care by the staff who serve them. Conversely, North Bay is in better physical condition and not in need of replacement. It has more reasonable options to expand or relocate its facility on site. Quality of care at North Bay will not be markedly enhanced by the construction of a new hospital. Sections 408.035(4)and(5), Florida Statutes, have been stipulated as not applicable in this case. Section 408.035(6), Florida Statutes: The availability of resources, including health personnel, management personnel, and funds available for capital and operating expenditures, for project accomplishment and operation The parties stipulated that both Community Hospital and North Bay have available health personnel and management personnel for project accomplishment and operation. In addition, the evidence proves that both applicants have sufficient funds for capital and operating expenditures. Community Hospital proposes to rely on its parent company to finance the project. Keith Giger, Vice-President of Finance for HCA, Inc., Community Hospital's parent organization, provided credible deposition testimony that HCA, Inc., will finance 100 percent of the total project cost by an inter-company loan at eight percent interest. Moreover, it is noted that the amount to be financed is actually $20 million less than the $196,849,328 stated in the CON Application, since Community Hospital previously purchased the proposed site in June 2003 with existing funds and does not need to finance the land acquisition. Community Hospital has sufficient working capital for operating expenditures of the proposed replacement hospital. North Bay, on the other hand, proposes to acquire financing from BayCare Obligated Group which includes Morton Plant Hospital Association, Inc.; Mease; and several other hospital entities. Its proposal, while feasible, is less certain since member hospitals must approve the indebtedness, thereby providing Mease with the ability to derail North Bay's proposed bond financing. Section 408.035(7), Florida Statutes: The extent to which the proposed services will enhance access to health care for residents of the service district The evidence proves that either proposal will enhance geographical access to the growing population in the service district. However, with its provision of obstetrical services, Community Hospital is better suited to address the needs of the younger community. With respect to financial access, both proposed relocation sites are slightly farther away from the higher elderly and indigent population centers. Since the evidence demonstrates that it is unreasonable to relocate both facilities away from the down-town area, Community Hospital's proposal, on balance, provides better access to poor patients. First, public transportation will be available to Community Hospital's site. Second, Community Hospital has an excellent record of providing care to the poor and indigent and has accepted the agency's condition to provide ten percent of its total annual patient days to Medicaid recipients To the contrary, North Bay's site will not be accessible by public transportation. In addition, North Bay has a less impressive record of providing care to the poor and indigent. Although AHCA conditioned North Bay's approval upon it providing 9.7 percent of total annual patient days to Medicaid and charity patients, instead of the 9.7 percent of gross annual revenue proposed in its application, North Bay has consistently provided Medicaid and charity patients less than seven percent of its total annual patient days. Section 408.035(8), Florida Statutes: The immediate and long-term financial feasibility of the proposal Immediate financial feasibility refers to the availability of funds to capitalize and operate the proposal. See Memorial Healthcare Group, Ltd. d/b/a Memorial Hospital Jacksonville vs. AHCA et al., Case No. 02-0447 et seq. Community Hospital has acquired reliable financing for the project and has sufficiently demonstrated that its project is immediately financially feasible. North Bay's short-term financial proposal is less secure. As noted, North Bay intends to acquire financing from BayCare Obligated Group. As a member of the group, Mease, the parent company of two hospitals that oppose North Bay's application, must approve the plan. Long-term financial feasibility is the ability of the project to reach a break-even point within a reasonable period of time and at a reasonable achievable point in the future. Big Bend Hospice, Inc. vs. AHCA and Covenant Hospice, Inc., Case No. 02-0455. Although CON pro forma financial schedules typically show profitability within two to three years of operation, it is not a requirement. In fact, in some circumstances, such as the case of a replacement hospital, it may be unrealistic for the proposal to project profitability before the third or fourth year of operation. In this case, Community Hospital's utilization projections, gross and net revenues, and expense figures are reasonable. The evidence reliably demonstrates that its replacement hospital will be profitable by the fourth year of operation. The hospital's financial projections are further supported by credible evidence, including the fact that the hospital experienced financial improvement in 2002 despite its poor physical condition, declining utilization, and lost market share to providers outside of its district. In addition, the development and population trends in the Trinity area support the need for a replacement hospital in the area. Also, Community Hospital has benefited from increases in its Medicaid per diem and renegotiated managed care contracts. North Bay's long-term financial feasibility of its proposal is less certain. In calendar year 2001, North Bay incurred an operating loss of $306,000. In calendar year 2002, it incurred a loss of $1,160,000. In its CON application, however, North Bay projects operating income of $1,538,827 in 2007, yet omitted the ongoing expenses of interest ($1,600,000) and depreciation ($3,000,000) from its existing facility that North Bay intends to continue operating. Since North Bay's proposal does not project beyond year two, it is less certain whether it is financially feasible in the third or fourth year. In addition to the interest and depreciation issues, North Bay's utilization projections are less reasonable than Community Hospital's proposal. While possible, North Bay will have a difficult task achieving its projected 55 percent increase in acute care patient days in its second year of operation given its declining utilization, loss of obstetric/pediatric services and termination of two exclusive managed care contracts. Section 408.035(9), Florida Statutes: The extent to which the proposal will foster competition that promotes quality and cost-effectiveness Both applicants have substantial unused capacity. However, Community Hospital's existing facility is at a distinct competitive disadvantage in the market place. In fact, from 1994 to 1998, Community Hospital's overall market share in its service area declined from 40.3 percent to 35.3 percent. During that same period, Helen Ellis' overall market share in Community Hospital's service area increased from 7.2 percent to 9.2 percent. From 1995 to the 12-month period ending June 30, 2002, Community Hospital's acute care market share in its service area declined from 34.0 percent to 25.9 percent. During that same period, Helen Ellis' acute care market share in Community Hospital's service area increased from 11.7 percent to 12.0 percent. In addition, acute care average occupancy rates at Mease Dunedin Hospital increased each year from 1999 through 2002. Acute care average occupancy at Mease Countryside Hospital exceeded 90 percent in 2000 and 2001, and was approximately 85 percent for the period ending June 30, 2002. Some of the loss in Community Hospital's market share is due to an out-migration of patients from its service area to hospitals in northern Pinellas and Hillsborough Counties. Market share in Community's service area by out-of- market providers increased from 33 percent in 1995 to 40 percent in 2002. Community Hospital's outdated hospital has hampered its ability to compete for patients in its service area. Mease is increasing its efforts to attract patients and currently completing a $92 million expansion of Mease Countryside Hospital. The project includes the development of 1,134 parking spaces on 30 acres of raw land north of the Mease Countryside Hospital campus and the addition of two floors to the hospital. It also involves the relocation of 51 acute care beds, the obstetrics program and the Neonatal Intensive Care Units from Mease Dunedin Hosptial to Mease Countryside Hospital. Mease is also seeking to more than double the size of the Countryside emergency department to handle its 62,000 emergency visits. With the transfer of licensed beds from Mease Dunedin Hospital to Mease Countryside Hospital, Mease will also convert formerly semi-private patient rooms to private rooms at Mease Dunedin Hospital. The approval of Community Hospital's relocated facility will enable it to better compete with the hospitals in the area and promote quality and cost- effectiveness. North Bay, on the other hand, is not operating at a distinct disadvantage, yet is still experiencing declining utilization. North Bay is the only community-owned, not-for- profit provider in western Pasco County and is a valuable asset to the city. Section 408.035(10), Florida Statutes: The costs and methods of the proposed construction, including the costs and methods or energy provision and the availability of alternative, less costly, or more effective methods of construction The parties stipulated that the project costs in both applications are reasonable to construct the replacement hospitals. Community Hospital's proposed construction cost per square foot is $175, and slightly less than North Bay's $178 proposal. The costs and methods of proposed construction for each proposal is reasonable. Given Community Hospital's severe site and facility problems, the evidence demonstrates that there is no reasonable, less costly, or more effective methods of construction available for its proposed replacement hospital. Additional "band-aide" approaches are not financially reasonable and will not enable Community Hospital to effectively compete. The facility is currently licensed for 401 beds, operates approximately 311 beds and is still undersized. The proposed replacement hospital will meet the standards in Florida Administrative Code Rule 59A-3.081, and will meet current building codes, including the Americans with Disabilities Act and the Guidelines for Design and Construction of Hospitals and Health Care Facilities, developed by the American Institute of Architects. The opponents' argue that Community Hospital will not utilize the 320 acute care beds proposed in its CON application, and therefore, a smaller facility is a less- costly alternative. In addition, Helen Ellis' architectural expert witness provided schematic design alternatives for Community Hospital to be expanded and replaced on-site, without providing a detailed and credible cost accounting of the alternatives. Given the evidence and the law, their arguments are not persuasive. While North Bay's replacement cost figures are reasonable, given the aforementioned reasons, including the fact that the facility is in reasonably good condition and can expand vertically, on balance, it is unreasonable for North Bay to construct a replacement facility in the Trinity area. Section 408.035(11), Florida Statutes: The applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent Community Hospital has consistently provided the most health care services to Medicaid patients and the medically indigent in Sub-District 5-1. Community Hospital agreed to provide at least ten percent of its patient days to Medicaid recipients. Similarly, North Bay agreed to provide 9.7 percent of its total annual patient days to Medicaid and charity patients combined. North Bay, by contrast, provided only 3.56 percent of its total patient days to Medicaid patients in 2002, and would have to significantly reverse a declining trend in its Medicaid provision to comply with the imposed condition. Community Hospital better satisfies the criterion. Section 408.035(12) has been stipulated as not applicable in this case. Adverse Impact on Existing Providers Historical figures demonstrate that hospital market shares are not static, but fluctuate with competition. No hospital is entitled to a specific or historic market share free from competition. While the applicants are located in health planning Sub-District 5-1 and Helen Ellis and the two Mease hospitals are located in health planning Sub-District 5- 2, they compete for business. None of the opponents is a disproportionate share, safety net, Medicaid provider. As a result, AHCA gives less consideration to any potential adverse financial impact upon them resulting from the approval of either application as a low priority. The opponents, however, argue that the approval of either replacement hospital would severely affect each of them. While the precise distance from the existing facilities to the relocation sites is relevant, it is clear that neither applicants' proposed site is unreasonably close to any of the existing providers. In fact, Community Hospital intends to locate its replacement facility three miles farther away from Helen Ellis and 1.5 miles farther away from Mease Dunedin Hospital. While Helen Ellis' primary service area is seemingly fluid, as noted by its chief operating officer's hearing and deposition testimony, and the Mease hospitals are located 15 to 20 miles south, they overlap parts of the applicants' primary service areas. Accordingly, each applicant concedes that the proposed increase in their patient volume would be derived from the growing population as well as existing providers. Although it is clear that the existing providers may be more affected by the approval of Community Hosptial's proposal, the exact degree to which they will be adversely impacted by either applicant is unknown. All parties agree, however, that the existing providers will experience less adverse affects by the approval of only one applicant, as opposed to two. Furthermore, Mease concedes that its hospitals will continue to aggressively compete and will remain profitable. In fact, Mease's adverse impact analysis does not show any credible reduction in loss of acute care admissions at Mease Countryside Hospital or Mease Dunedin Hospital until 2010. Even then, the reliable evidence demonstrates that the impact is negligible. Helen Ellis, on the other hand, will likely experience a greater loss of patient volume. To achieve its utilization projections, Community Hospital will aggressively compete for and increase market share in Pinellas County zip code 34689, which borders Pasco County. While that increase does not facially prove that Helen Ellis will be materially affected by Community Hospital's replacement hospital, Helen Ellis will confront targeted competition. To minimize the potential adverse affect, Helen Ellis will aggressively compete to expand its market share in the Pinellas County zip codes south of 34689, which is experiencing population growth. In addition, Helen Ellis is targeting broader service markets, and has filed an application to establish an open- heart surgery program. While Helen Ellis will experience greater competition and financial loss, there is insufficient evidence to conclude that it will experience material financial adverse impact as a result of Community Hospital's proposed relocation. In fact, Helen Ellis' impact analysis is less than reliable. In its contribution-margin analysis, Helen Ellis utilized its actual hospital financial data as filed with AHCA for the fiscal year October 1, 2001, to September 30, 2002. The analysis included total inpatient and total outpatient service revenues found in the filed financial data, including ambulatory services and ancillary services, yet it did not include the expenses incurred in generating ambulatory or ancillary services revenue. As a result, the overstated net revenue per patient day was applied to its speculative lost number of patient days which resulted in an inflated loss of net patient service revenue. Moreover, the evidence indicates that Helen Ellis' analysis incorrectly included operational revenue and excluded expenses related to its 18-bed skilled nursing unit since neither applicant intends to operate a skilled nursing unit. While including the skilled nursing unit revenues, the analysis failed to include the sub-acute inpatient days that produced those revenues, and thereby over inflated the projected total lost net patient service revenue by over one million dollars.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Community Hospital's CON Application No. 9539, to establish a 376-bed replacement hospital in Pasco County, Sub- District 5-1, be granted; and North Bay's CON Application No. 9538, to establish a 122-bed replacement hospital in Pasco County, Sub-District 5- 1, be denied. DONE AND ENTERED this 19th day of March, 2004, in Tallahassee, Leon County, Florida. S WILLIAM R. PFEIFFER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2004. COPIES FURNISHED: James C. Hauser, Esquire R. Terry Rigsby, Esquire Metz, Hauser & Husband, P.A. 215 South Monroe Street, Suite 505 Post Office Box 10909 Tallahassee, Florida 32302 Stephen A. Ecenia, Esquire R. David Prescott, Esquire Richard M. Ellis, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Saliba, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Darrell White, Esquire William B. Wiley, Esquire McFarlain & Cassedy, P.A. 305 South Gadsden Street, Suite 600 Tallahassee, Florida 32301 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Rhonda M. Medows, M.D., Secretary Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308

Florida Laws (3) 120.569408.035408.039
# 1
PASCO-PINELLAS HILLSBOROUGH COMMUNITY HEALTH SYSTEM, INC. vs AGENCY FOR HEALTH CARE ADMINISTRATION, 07-003484CON (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 26, 2007 Number: 07-003484CON Latest Update: Jan. 07, 2009

The Issue Whether there is need for a new hospital in AHCA Acute Care Subdistrict 5-2 (eastern Pasco County)? If so, whether AHCA should approve either CON 9975 or CON 9977?

Findings Of Fact The Applicants and Background Pasco-Pinellas Pasco-Pinellas, the applicant for CON 9975, is a joint venture between two nonprofit healthcare organizations: University Community Hospital, Inc. (UCH) and Adventist Health System Sunbelt Healthcare Corporation (Adventist). A not-for-profit healthcare system, UCH has served the Tampa Bay area for the last 40 years. It owns and operates two hospitals in Hillsborough County and one in Pinellas County. UCH has approximately $100 million available for capital expenditures to fund the hospital proposed by CON 9975. One of its Hillsborough County facilities, University Community Hospital, is located on Fletcher Avenue in northern Hillsborough County, AHCA Health Planning District VI. Across the street from the main campus of the University of South Florida (USF) and its College of Medicine, University Community Hospital has an agreement with USF for GME. University Community Hospital at present serves the Wesley Chapel area in eastern Pasco County. The other member of the joint venture, Adventist, is a financially successful not-for-profit healthcare organization. It operates 17 hospitals in the state of Florida. As of December 31, 2007, Adventist's cash on hand, including investments, exceeded $3.6 billion and net revenue for 2007 was approximately $368 million. The joint venture between UCH and Adventist was formed to establish a hospital to serve the Wesley Chapel area of Pasco County and to provide other healthcare services in the county. At present, the two members of the joint venture compete to serve the Wesley Chapel area through University Community Hospital and Adventist's Florida Hospital Zephyrhills (FHZ), a 154-bed general acute care hospital in Pasco County. The collaboration of competing hospitals in seeking approval for a new hospital through Florida's CON process is unusual. But by bringing the similar missions, strength in community interests and capable leadership of UCH and Adventist together, the Pasco Pinellas joint venture poses potential healthcare benefits to eastern Pasco County. BayCare The Applicant for CON 9977, BayCare of Southeast Pasco, Inc., is a not-for-profit corporation formed to develop the hospital proposed in the application. The sole member of BayCare is BayCare Health System, Inc. ("BayCare System"). BayCare System is the largest full-service community- based health care system in the Tampa Bay area. It operates 9 nonprofit hospitals and 11 ambulatory/outpatient centers in Hillsborough, Pasco and Pinellas counties. Initially organized in 1997 under a joint operating agreement between several hospitals, BayCare System's purpose has been to compete effectively in managed care operations in order to reduce the expenses of the individual organizations that are its members. In the first 5 years of operation, BayCare System saved its members a total of $90 million because of the enhanced cost efficiencies it achieved through business function consolidations and group purchasing. Its members are all not-for-profit hospitals. BayCare System's focus is on the treatment of one patient at a time. Its mission is to improve the lives of people in the community it serves, to operate effectively as a group of not-for-profit hospitals, and to provide high quality, compassionate healthcare. BayCare's application, because it provides potential for its proposal with its teaching aspects, draws significant and considerable support from USF, a national research university. USF has a College of Medicine, a College of Nursing, and a College of Public Health, collectively "USF Health." USF Health will collaborate with BayCare in the development of the hospital BayCare proposes, should it be approved and should its teaching functions come to fruition. The Agency The Agency for Health Care Administration is the state agency that administers the CON program pursuant to Section 408.034, Florida Statutes. It will make the final decisions to approve or deny the two CON applications at issue in this proceeding. Community Community Hospital is a general acute care for profit hospital with 386 beds. It is located within the City of New Port Richey in western Pasco County, Acute Care Subdistrict 5-1. With the exception of neonatal intensive care, open heart surgery and organ transplantation, Community is a full- service community hospital. It provides OB services. It is licensed for 46 adult psychiatric beds. It offers a variety of outpatient services including outpatient surgery, endoscopy, and outpatient procedures and lab testing. Its medical staff consists of approximately 400 physicians. Community serves patients without regard to ability to pay, and does not discriminate in any manner. Accredited by the Joint Commission on Accreditation of Hospital Organizations, it has received numerous awards and recognition for the quality of its health care services. Community's hospital facility is over 30 years old. Access to the campus from US 19, the closest major thoroughfare approximately 1.5 miles away, is gained via a two-lane street through a residential area. Land-locked but for the two-lane street, the campus is sandwiched between the residences and a high school. There are no medical office buildings ("MOB") owned by Community on the campus; less than 20 acres in size, it is completely built out. Community's Replacement Hospital Community has a replacement hospital facility currently under construction in Acute Care Subdistrict 5-2. Approximately five miles southeast of Community's New Port Richey location, the replacement facility is located at the intersection of Little Road and State Road 54. Expected to open in late 2010 at a cost in excess of $200 million, it is to be known as Medical Center of Trinity ("Trinity"). All current Community services will be offered at Trinity. At the same time, the new hospital will offer many advantages over the old facility. Trinity will initially be five stories in height, with fewer licensed beds, but constructed with the ability to expand. It will offer new medical equipment with the latest technology. Situated on 52 acres, with a new three-story MOB adjacent to the hospital, Trinity has plans to add a second MOB at some time in the future. Unlike existing Community Hospital, Trinity will have all private rooms. Its more efficient layout among service areas will improve efficiencies and patient satisfaction. Trinity's location is more accessible than Community's current location in New Port Richey. It is on State Road 54 (SR 54), a six-lane highway that runs east/west through Pasco County. The road has recently undergone major construction and expansion which was nearly complete at the time of hearing. Suncoast Parkway (a/k/a Veterans Expressway), furthermore, is an expressway toll road system that runs north/south from Hernando County through Pasco County to Tampa airport. From the intersection of Suncoast Parkway and SR 54, it takes approximately seven minutes to reach Trinity. Little Road runs north/south along the Trinity site, and north through Pasco County to Regional Medical Center Bayonet Point ("Bayonet Point"). Community's poor financial performance in recent years is expected to improve after the opening of Trinity. The Proposals Although both applicants propose a new hospital in roughly the same location in Subdistrict 5-2, the two are different both in scope and approach. Pasco-Pinellas' Proposal Pasco-Pinellas proposes to build an 80-bed acute care hospital on Bruce B. Downs Boulevard in the area known as Wesley Chapel in eastern Pasco County. If approved and constructed, the hospital will include 36 medical/surgical beds, 8 labor/delivery/recovery/post partum beds, 12 critical care beds, and 24 progressive care beds. The project would involve 184,000 gross square feet of new construction, at a total estimated cost of $121 million. Pasco-Pinellas proposes a typical primary service area (PSA). Five and one-half zip codes comprise the PSA; Pinellas- Pasco reasonably projects 82% of its admissions will come from the PSA. Two and one-half zip codes comprise the secondary service area (SSA). The zip code that is shared by the PSA and the SSA (33559) is split roughly in half between Pasco County and Hillsborough County. The half that is in Pasco County is in Pasco-Pinellas' PSA. The five full zip codes in the PSA are 33541, 33543, 33544, 34639, and 33576. The two full zip codes in the SSA are 33549 and 33647. Pasco-Pinellas' in-migration from outside its proposed service area (the PSA and the SSA) is forecast by Pasco- Pinellas's health planner at 12%. For a community hospital in the Wesley Chapel area without tertiary services, the in- migration percentage projected by Pasco-Pinellas is reasonable. BayCare's Proposal BayCare proposes to establish a general acute care hospital with 130 beds. The application proposes that it be collaboratively developed by BayCare System and USF Health so as to provide teaching functions associated with the USF College of Medicine and other health-related university components of USF Health. Consisting of approximately 476,000 square feet of new construction at an estimated total project cost of approximately $308 million, the hospital will have 92 medical/surgical beds, 24 critical care beds, and 14 post-partum beds. Like Pasco-Pinellas' proposal, BayCare's proposed hospital will be located on Bruce B. Downs Boulevard in the Wesley Chapel area of southeastern Pasco County. BayCare's proposed PSA is circular. The center point of the PSA is the proposed BayCare hospital site in the Wesley Chapel area. The circumference is along a series of seven-mile radii so that the diameter of the circular PSA is 14 miles. The seven-mile radius was chosen to approximate a fifteen-minute travel time by automobile from the outer edge of the circular PSA to the hospital site. BayCare's PSA includes some part of seven zip codes. Two are Wesley Chapel zip codes: 33543 and 33544. Two are Lutz area zip codes: 33549 and 33559. Two are Land O'Lakes zip codes: 34639 and 34638, and one is a zip code in Hillsborough County: 33647. Relative to typical PSAs for most proposed hospitals, the PSA proposed by BayCare's application was described at hearing by BayCare's health planner as "small." See Tr. 1855. For calendar years 2013 and 2014, BayCare projects that 19,0976 and 20,008 patient days, respectively, will be generated from within the PSA. These projections constitute a projection of 60% of all patient days projected for the two years, a percentage substantially lower than would be generated from a typical PSA. The remaining 40% of projected patient days is roughly double what would be expected from beyond a PSA under a more typical proposal. The high number of projected patient days for patients originating outside the PSA was explained at hearing by BayCare's health planner. The involvement of the USF Physician's Group and the "teaching" nature of the proposal "pumps up and provides an additive level of in-migration that would not be experienced without the USF combination with BayCare in [the] project." Tr. 1856-7. Pasco County Hospitals There are five hospitals in Pasco County. Two in western Pasco County will continue to remain in Subdistrict 5-1 in the near future: Regional Medical Center Bayonet Point, located in northwest Pasco County and Morton Plant North Bay Hospital, located in New Port Richey. Two are in eastern Pasco County, Subdistrict 5-2: Pasco Regional Medical Center in east central Pasco County, and FHZ, located in southeast Pasco. The fifth is Community/Trinity. No Need for Both Hospitals None of the parties contends there is need for both hospitals. Nor would such a contention be reasonable. Indeed, the record does not demonstrate need for both a new 80-bed community hospital as proposed by Pinellas-Pasco and a new 130- bed hospital that BayCare denominates a "teaching" hospital, each with an intended location on Bruce B. Downs Boulevard in the Wesley Chapel area of southeastern Pasco County in Subdistrict 5-2. The question remains: is there a need for one new hospital? If so, which of the two applications, if either, should be approved? Need for a New Hospital; Access Enhancement Among the counties in the Tampa Bay area, Pasco County has been the fastest growing in recent years. From 1990 to 2000, its population grew 22.6%. Three times higher than the state average, this represents tremendous growth for any locale. The Wesley Chapel area of south Pasco County roughly coincides with the PSAs of the two applicants. Dramatic growth over the last 20 years has marked the Wesley Chapel area's transformation from an agricultural area to a suburban community. North of Hillsborough County and its largest city, Tampa, improvements in the transportation network has made south Pasco County and in particular, the Wesley Chapel area, a bedroom community for workers commuting to Tampa. Claritas, a national demographic data service, is a generally accepted population projection source for CON applications. Claritas projects the growth in Pasco County to continue. For example, the projected population for Pasco- Pinellas' proposed PSA, which substantially overlaps with BayCare's proposed PSA, is 113,397 in 2011 and 118,505 in 2012. The Claritas projections are based on the most recent decennial U.S. Census, that is, 2000, and do not take into account data of impending population growth, such as new housing starts and new schools. Claritas, therefore, may understate projections in areas that have experienced more recent, rapid growth. The University of Florida Bureau of Economic and Business Research ("BEBR") also provides reliable population data by county. In the year 2000, the census for the Pasco County population was 344,765. By 2030, that population is projected by BEBR to grow to 526,100 based on low projections, 681,100 based on medium projections, and 876,900 based on high projections. For the high projection rate, this would constitute a 154% increase in population. Even assuming the low growth rate, the population would increase by 53%. According to BEBR data, the county can be expected to grow at a rate of 4.71% per year. Another source of population data relied upon by population experts is Demographics USA. The Demographics USA data shows a substantial growth in population for Pasco County. According to Demographics USA, the population for Pasco County can be expected to grow from 343,795 in the year 2000 to 440,527 in the year 2010 and then to 504,277 by the year 2015. Based on the Demographics USA data, the county can be expected to grow at a rate of 3.11% per year. The Wesley Chapel area is considered to be the area of Pasco County with the most development and development potential now and in the future. Of 175 major projects actively undergoing development in Pasco County, 76 are in the Wesley Chapel area. Between 2010 and 2012, the population in the area is projected to grow by 5,000 persons per year. With the increase in the general population in the area comes an expected increase in the need for schools. Of 37 schools identified by the Pasco County School Board to be built in the near future, 19 are to be located in the Wesley Chapel area. Whether the historic growth rate of the last few decades will continue for sure is an open question with the downturn in the economy and the housing market that commenced in Pasco County in mid-2007. Absent a major recession, however, it is reasonable to expect growth in the Wesley Chapel area to continue even if not at a rate as rapid as in the recent past. Whatever the future holds for Wesley Chapel's growth rate, there is clearly a demand for inpatient general acute care services in the Wesley Chapel area. The total non-tertiary discharges from the Pasco-Pinellas service area was 15,777, excluding newborns, for the 12-month period ending June 30, 2006. As a result, AHCA found the existing and growing population in the Wesley Chapel area warranted a new hospital. Along with significant growth in the Wesley Chapel area comes resulting traffic and healthcare and hospital access issues. Drive time analysis shows the average drive time from each of the Pasco-Pinellas PSA six area zip codes to the eight area hospitals in 2007 to be 46.11 minutes. The analysis shows that future drive time is expected to be lengthier, strengthening the need for a hospital in the Wesley Chapel area. In 2012, the average time increase is expected to 57.68 minutes. A Drive Time Study Report prepared by Diaz Pearson & Associates compared drive times to the proposed site for Pasco- Pinellas hospital to eight existing hospitals: UCH, Pasco Regional, FHZ, Tampa General, University Community Hospital on Dale Mabry in Tampa, St. Joseph's North, St. Joseph's in Tampa, and the site for Community's replacement hospital. The study concluded: The results of this travel study demonstrate that the vehicular travel times for access to the proposed PPHCHS Hospital [Pasco- Pinellas' Hospital] are consistently LESS for residents within the six Zip codes of the Primary Service Area for years 2007, 2011, and 2012 than for comparable trips to any of the eight area hospitals for alternate choice. Pasco-Pinellas 36, p. 27. Of particular note are the travel times from each of the six zip codes in Pasco-Pinellas' PSA to UCH, FHZ, and Tampa General. For example, a patient driving from the centroid point in zip code 33559 to UCH would take 24.28 minutes and to FHZ would take 37.97 minutes in 2007. This increases to 29.55 minutes and 50.94 minutes in 2012. Another example, the time it takes a patient to travel from zip code 33541 to Tampa General was 75.51 minutes in 2007. In 2012, the travel time is projected to increase approximately 20 minutes to 95.33 minutes. In contrast, a new hospital in the Wesley Chapel area would decrease travel times significantly for patients in the six zip code areas of the Pasco-Pinellas PSA. For example, in 2007, it would only take a zip code 33559 patient 11.41 minutes to reach the proposed site for Pasco-Pinellas. This represents a time savings of 12.87 minutes compared to the average driving time to UCH and 26.56 minutes compared to the average driving time to FHZ. In 2012, the reduction in time to drive to Pasco- Pinellas' proposed hospital site instead of UCH is 18.34 minutes and for FHZ, it is 39.53 minutes. The time savings for patients from the 33541 zip code traveling to Tampa General for non- tertiary services is even greater. Using Pasco-Pinellas' site in the Wesley Chapel area would save the patient 52.67 minutes in 2007 and is projected to save 63.88 minutes in 2012. Anecdotal evidence supports the need for a new hospital in the Wesley Chapel area. Dr. Niraj Patel practices obstetrics and gynecology in the Wesley Chapel area. A drive for him in good traffic is typically 20 minutes to UCH (the only hospital at which he practices because the distance between area hospitals is too great). In morning traffic during "rush" periods, the drive can exceed 40 minutes. Caught in such a drive in January of 2008, Dr. Patel missed the delivery of a patient's baby. He was required to appear before the UCH Medical Staff's credentials committee to "explain the situation . . . [because it] was the third or fourth [such] episode." Pasco-Pinellas 47, p. 11. As Dr. Patel explained in a pre- hearing deposition, "it doesn't fare well for me . . . credential and requirement wise but it doesn't fare well for the patient [who] had to be delivered by the nursing staff which [without a physician present] increases patient risk and [the chance] of complication[s]." Id. A new hospital in the Wesley Chapel area will provide residents of the Pasco-Pinellas PSA or the BayCare PSA with shorter travel time to a hospital compared to the time necessary to reach one of the eight existing hospitals in the region. In 2007, residents of the six zip codes in the Pasco-Pinellas' PSA could be expected to access Pasco-Pinellas' proposed hospital in a range of 10.9 to 21.8 minutes. For the year 2012, the time can be reasonably predicted to range from 17 to 31.4 minutes. In comparison the drive times to the eight hospitals in the region for residents of Pasco-Pinellas' PSA are significantly longer. In 2007, it took a resident in zip code 34639 approximately 55 minutes to get to UCH and 73 minutes to get to St. Joseph's Tampa. By 2012, those drive times are reasonably projected to increase to 64 minutes and 83 minutes, respectively. Simply put, travel times are expected to increase as the population increases in coming years. The site of Pasco-Pinellas' hospital is approximately one mile from the site of the proposed BayCare hospital. The travel times suggested for the residents of the Pasco-Pinellas PSA to the proposed Pasco-Pinellas hospital can be expected to be similar to travel times to the proposed BayCare hospital. Given the proximity of the two proposed sites, either will significantly reduce travel time to hospitals for patients in the Wesley Chapel area. The existence in the Wesley Chapel area of a community hospital with an emergency room and primary inpatient services will benefit doctors, patients and their families. Heightened driving concerns among elderly patients and traffic congestion and inadequate roadways that delay Emergency Medical services support the need for a Wesley Chapel area hospital. The support is based not only on 2007 travel times but also on the reasonable expectation that travel time will be greater in the future. Existing hospitals are capable of absorbing the increased need for acute care hospital services that result from the increased growth that is reasonably projected to occur in Subdistrict 5-2. If there is to be a new hospital in the subdistrict, the Wesley Chapel area is the best location for it. A new hospital in the Wesley Chapel area will enhance access to acute care services for residents of Subdistrict 5-2. Preliminary Agency Action; the SAAR The Agency determined that there is a need for a new hospital in the Wesley Chapel Area when it issued its State Agency Action Report on CONs 9975 and 9977. The Agency also determined that between the two applications, Pasco-Pinellas was superior and should therefore be approved over BayCare's. This determination was founded primarily on Pasco-Pinellas' application being more reasonable in terms of size and impacts on existing providers. The Agency maintained at hearing the position it took in it preliminary action memorialized by the SAAR. Jeffrey Gregg, Chief of AHCA's Bureau of Health Facility Regulation received in this proceeding as an expert in health planning and CON Review explained when called to the stand to testify: The proposal by [Pasco-Pinellas] was on the smaller side and gave us more comfort [than BayCare's] . . . [W]hile we . . . agree with these applicants that there is a hospital in the future of [the Wesley Chapel area], we are more comfortable with the conservative approach, the smaller approach [of Pasco- Pinellas], particularly given that should it be necessary in the future, any hospital can add beds, acute care beds, merely by notifying us. And we were more comfortable that [Pasco-Pinellas'] approach would be able to expand access and improve services for people in this area while at the same time minimally impacting all of the competitors. Tr. 1995. As detailed below, AHCA's determination that the Pasco-Pinellas application is superior to BayCare's is supported by the record even if the basis for the determination made on the state of the record is not quite the same as the basis advanced at hearing by AHCA. Size and Cost Pasco-Pinellas proposed hospital involves about 184,000 square feet of new construction at a cost of approximately $121 million dollars. It is much smaller and less costly than BayCare's proposed hospital of 476,000 square feet of new construction for about $308 million. The Pasco-Pinellas proposal is more reasonably sized to meet the needs of the Wesley Chapel area and, in turn, Subdistrict 5-2. The difference in size and cost of the two proposals, however, is a function of a major difference in approach in the applications. Pasco-Pinellas' proposal is for a typical community hospital that would start out with a bed size within a range that includes 80 beds. BayCare, on the other hand, proposes to serve not only the Wesley Chapel area and Subdistrict 5-2, but also a substantial population of patients to be drawn to the subdistrict particularly from Hillsborough County. Patients migrating to the hospital from outside the subdistrict will for the most part be the product of BayCare's affiliation with USF Health and its service to the USF College of Medicine in its proposal denominated in the application as a "teaching hospital." Need for a New Teaching Hospital "Teaching hospital" is a term defined in the Health Facility and Services Development Act, sections 408.031-408.045, Florida Statutes: "Teaching hospital" means any Florida hospital officially affiliated with an accredited Florida medical school which exhibits activity in the area of graduate medical education as reflected by at least seven different graduate medical education programs accredited by the Accreditation Council for Graduate Medical Education or the Council of Postdoctoral Training of the American Osteopathic Association and the presence of 100 or more full-time equivalent resident physicians. The Director of the Agency for Health Care Administration shall be responsible for determining which hospital meets this definition. § 408.07(45), Fla. Stat. The Agency has not determined that BayCare's proposal meets the statutory definition as directed by the statute for it to qualify as a "teaching hospital." The record indicates that the proposal is not a typical teaching hospital. For example, teaching hospitals in the United States are usually located near indigent populations to achieve the efficiency of training future practitioners with treating people who otherwise could not afford services. BayCare's proposal in a small county with a more affluent population does not serve that purpose. BayCare contends neither that it is a "statutory" teaching hospital nor that it should be determined by the Agency to meet the statutory definition of "teaching hospital." Instead it grounds its case for need in the teaching functions its proposal would fulfill for USF Health and in particular for the GME needs of the students of the USF College of Medicine and the results those teaching functions would produce. Considerable testimony was offered by BayCare at hearing with regard to GME and the needs and aspirations of the USF College of Medicine. The Dean of the College, Stephen K. Klasko, M.D., spiritedly and eloquently related a narrative of need which was supported and amplified by other witnesses including faculty members at the college. There were many elements to the narrative. Highlights include the hybrid nature of the USF College of Medicine, "acting like a research intensive medical school . . . in a community-based body" (tr. 1132)," its on-going successful striving towards becoming an academic center for world class physicians as evidenced by this year's receipt of a research grant from the National Institute for Health, "the largest . . . given to a medical school in the last four or five years," id., and the GME challenges the college faces in the Tampa Bay area such as the recent loss of its anesthesiology residency program. BayCare's opponents point out the many ways in which the proposal is not only not a statutory teaching hospital but does not fit a nationwide model for teaching hospitals. BayCare counters that its model is one of many different models for a teaching facility. Whatever the merits of the various assertions of the parties on the point, USF's need for a teaching facility will be filled at least in part by the BayCare proposal. It is not an exaggeration, moreover, to call USF's need in this regard compelling. USF's institution-specific need, however, does not fall under any of the CON review criteria. See paragraphs 167- 8, below, in the Conclusions of Law. Perhaps not unmindful of the limits of the criteria, BayCare's presented other evidence that flows from the teaching function of the BayCare proposal. Relevant to the general criterion of "need" in subsection (1) of the Statutory CON Review Criteria, the evidence relates to physician shortages. The Physician Shortage There is a shortage of physicians in the district as there is in Pasco County. The problem has statewide dimensions. The state is not doing enough to replace aging doctors in Florida with younger doctors. Nor are aging doctors providing sufficient emergency room call coverage. The physician shortage both in general and in emergency rooms in the state is likely to increase. Residents are more likely to remain and practice in the community in which they train. Residents in the Tampa Bay area, in particular, are more likely to remain in the Tampa Bay area to practice. Even 20 residents per year in training at BayCare's proposed hospital would make a difference in existing physician shortages. Should BayCare's proposed hospital be built and operated as contemplated, the teaching functions that BayCare's application proposes to offer at the hospital would serve as a step, however small, toward meeting Florida's physician shortage as well as the shortage in District V, Pasco County, Subdistrict 5-2 and the Tampa Bay area. Nonetheless, there is a feature of this case that undermines BayCare's claim that the proposal will aid the physician shortage and its denomination in the application of the proposal as a "teaching hospital." The feature is present in the agreement between USF and BayCare (the "BayCare and USF Agreement) to make the BayCare proposed hospital a University Hospital. The BayCare and USF Agreement The BayCare and USF Agreement contains a section devoted to implementation and termination. The following is excerpted from the section's six separately numbered paragraphs: The Parties [the University of South Florida Board of Trustees or USF and BayCare Health System, Inc.] shall negotiate in good faith all other terms and conditions relating to the execution and implementation of this Agreement, including, without limitation, any revisions to the provisions of the Articles of Incorporation and Bylaws of the Hospital Corporation, the terms and conditions of the Health Affiliation Agreement, the design and layout of the University Hospital . . . [etc.] and such other documents and instruments as the Parties may find necessary or desirable to implement the terms of this Agreement. In the event the Parties are unable to agree on all such terms and conditions and all such documents required to implement the terms and provisions of this Agreement despite their good faith efforts to do so, either Party shall have the option after a period of at least twenty four months from the Effective Date or six months after the final approval of the Certificate of Need for the University Hospital is received, whichever is longer, to terminate this Agreement on the terms described in this [s]ection . . . . BayCare 2, Appendix C, BayCare and USF Agreement, Section G, p. 8. (Emphasis supplied.) For USF to terminate, the terms include payment to BayCare of $500,000 and agreement that for five years after termination it will not enter into an affiliation or other agreement with any other provider for the establishment of a university hospital in Pasco County. See id. The ability of USF to terminate the agreement is not "at will." It requires good faith efforts to have been made at implementations that fail to work. Furthermore, termination is not without consequences. But the termination provision in the agreement is consistent with the lack of a condition in BayCare's application that the BayCare proposal be a teaching hospital, "one more detail that made [AHCA officials] scratch our heads about the characterization of this hospital as a teaching hospital." Tr. 2011. It is also consistent with USF's support for "legislation that would be statewide that would allow state medical schools at some point, if they chose to, to make it easier . . . to have a hospital or research hospital on campus . . . [of which] USF would be one . . . " Tr. 1190-91. Adverse Impact Providers Outside the District Evidence was produced at hearing about the adverse impact of approval of either of the two applications on providers outside the district. Objections to the evidence were taken under advisement pending consideration of post-hearing memoranda submitted by the parties. Upon consideration of the memoranda, the objections are sustained. See paragraphs 159-66, below, in the Conclusions of Law. Providers Within the District The Pasco-Pinellas proposal will have minimal impact on Community/Trinity Medical Center. Its impact on other hospitals will be minimal with the exception of its two partner hospitals--UCH and FHZ--and of those two, only FHZ is in the District. There will be no adverse impact on Community as a result of the BayCare proposal. There is little patient flow from eastern Pasco to the western Pasco hospitals. Only about 1% of the patients in eastern Pasco travel west for services at Community, Morton Plant or Bayonet Point. It is reasonable to project that there will be no material change in Community's patient draw as a result of the new Trinity Medical Center. The projections by Community's health care and financial experts of patient days that would be lost and adverse financial impact to Community/Trinity should the BayCare proposal be approved were based on faulty assumptions. The majority of the adverse impact from BayCare's proposal, as in the case of Pasco-Pinellas' proposal, will be on UCH and FHZ. Availability of Resources Nursing and Non-Nursing Staff Pasco-Pinellas should be able to recruit and retain nursing and other staff for its hospital based on the Adventist experience at FHZ. The nursing vacancy at FHZ is 1% lower than the vacancy rate reported by the Florida Hospital Association (7.5% and 8.5%, respectively.) The turn-over rate for nurses at FHZ is 12%, significantly lower than the national rate in the 18-19% range. Recruitment of nurses has been successful at FHZ particularly in the last few years. In 2007, FHZ hired 100 nurses and reduced its use of agency nursing staff by roughly 75%. Among its different recruitment tactics have been a foreign nursing program, education and training incentives, scholarships at local colleges and specialty pay programs. Pasco-Pinellas will use many of the same recruiting techniques that have been successful at FHZ. It is reasonably anticipated that the same recruitment practices employed by FHZ will work for Pasco-Pinellas. Many members of the current nursing staff at FHZ, moreover, live in the Wesley Chapel area and have expressed an interest in working at Pasco-Pinellas. Retention programs at FHZ have been aimed at retaining better nurses. These include the magnet concept and a self- governance program with "a unit based council and nursing council so nurses . . . practicing . . . at the bedside have the opportunity to help govern the practice of nursing." Tr. 225-6. Retention programs similar to those used at FHZ will be implemented at Pasco-Pinellas. Schedule 6 in Pasco-Pinellas application reflects anticipated staffing for its new hospital. The staffing model is consistent with staffing at other Adventist facilities, specifically FHZ. The average salaries and wages are based on actual salaries inflated forward to the projected date of opening. The FTEs per adjusted occupied bed are adequate and consistent with the staffing patterns at FHZ. All necessary staffing positions are accounted for and the number of FTEs and salaries are sufficient for the hospital to operate and provide high quality of care. The registered nurse FTEs, as opposed to LPNs and lower-level nursing care, in Schedule 6 offer optimal staffing to provide high quality care and positive patient safety. The nursing salaries are adequate for the time frame in which Pasco-Pinellas will open with a one-time 5% increase and a 4% increase per year from present until opening. Schedule 6 supports the reasonable expectation that Pasco-Pinellas will be able to recruit and hire nursing staff and retain an adequate staff. The proposed staffing pattern in Schedule 6 of the Pasco-Pinellas application, which includes nursing staff, moreover, is reasonable. BayCare has a comprehensive recruitment program for recruiting and retaining nursing personnel as well. The strategies include a partnership with the nursing programs at USF and St. Petersburg College. BayCare System provides additional training to its nurses and with regard to salaries has committed to remaining competitive in the market. BayCare's recruitment and retention initiatives have been successful. In the 2008 year to date at the time of hearing, BayCare System had been able to hire more experienced nurses that it did in 2007 for the same time period. Overall, the BayCare System has a turnover rate of about 15%. The RN vacancy is 10% with a 13% turnover rate. These figures are comparable to state and national figures; in some cases they are lower. With regard to non-nursing employees or team members, BayCare System also had developed recruitment initiatives that are targeted toward those individuals. BayCare System has a positive reputation in the community as a good place to work. As an example, the three St. Joseph's hospitals (St. Joseph', Women's and Children's) and South Florida Baptist received recognition among the "Best Work Places in Health Care" for the years 2005 and 2006. The award recognizes outstanding practices related to employees. BayCare has the ability to recruit and retain the staff necessary to staff the proposed BayCare SE Pasco hospital. The staffing projections in Schedule 6 of BayCare's application, which includes nursing staff, are reasonable. Physician Support Despite the physician shortage, both applicants should be able to adequately staff their hospitals with physicians as shown by the evidence with regard to physician support for the hospitals. Florida Medical Clinic (FMC), a multi-specialty physician group practice with 85 physicians, is the primary physician group that serves the Wesley Chapel area. Thirty percent of its members are family practitioners or specialists in internal medicine. The remainder of the members cover 20 or so specialties that include both secondary and tertiary specialties. FMC has determined that it will support the Pasco- Pinellas proposal through its physicians, admissions and outpatients activity. Ninety percent or more of the clinic's patients use the UCH and FHZ facilities. FMC has a long- standing relationship with the administrators, personnel, and strategic issues of FHZ and UCH and is comfortable developing future plans for a hospital facility in Wesley Chapel with the two organizations FMC is able to meet the needs of the Wesley Chapel community both today and in the future. In addition, there are numerous other individual physicians who practice in the Wesley Chapel area who "predominantly support University Community Medical Center and Florida Hospital in Zephyrhills." Tr. 63. Having relationships with physicians already in a market when a hospital is being developed is advantageous to the new hospital. Among other advantages, it minimizes resources used to recruit and move new physicians into the area. In contrast to support for the Pasco-Pinellas proposal, FMC has not made a commitment to BayCare as to its proposal because of lack of knowledge about the structure of the facility, its strategic plans and whether or not FMC's interests align with the BayCare proposal but it has not foreclosed such a commitment. The USF physicians group will be a source of many of the physicians who will staff the BayCare proposed hospital, a likely reason for FMC's lukewarm to non-existing support for BayCare's proposal. USF emergency physicians will staff the Emergency Department. The BayCare System has approximately 28 physicians with privileges at BayCare System facilities with offices in the Wesley Chapel area. The proposed BayCare hospital will be staffed by recruited physicians and USF faculty physicians. Other physicians from the Wesley Chapel area provided testimony of their support for the BayCare proposal. It is reasonable to anticipate that some local Wesley Chapel area physicians will join the medical staff of the proposed BayCare hospital. Despite the physician shortages in the subdistrict, District V and the Tampa Bay area, both Pasco-Pinellas and BayCare will be able to staff their hospitals adequately with physicians. Charity and Medicaid; Conditions Pasco-Pinellas committed to a number of conditions of its applications. These include a 12.6% commitment to charity and Medicaid; the establishment of funding for a clinic for the underserved, provision of educational programs for the community, and two neonatal transports and funding for local fire and rescue services. BayCare projects a 6.1% level of charity care, 2.4% higher than Pasco-Pinellas' charity care commitment. It projects 10.3% of its Medicaid and Medicaid HMO patients will be attributable to Medicaid and Medicaid HMO patients versus 8.9% at Pasco-Pinellas. BayCare System has a history of providing services to Medicaid and Charity Patients. In 2006, for example, as not- for-profit entities, BayCare System facilities and related entities provided a total community benefit of $135 million in uncompensated care. Approximately 50% was pure charity care. BayCare System facilities currently serve patients from the Wesley Chapel area, including, of course, Medicaid and charity patients. BayCare System facilities provide 57% of the charity care and 31% of the Medicaid in the market. St. Joseph's Children's Hospital and St. Joseph's Women's Hospital operate at approximately 50-to-60% Medicaid and un-reimbursed care. St. Joseph's Hospital currently serves approximately 20% of the patients from the Wesley Chapel area. St. Joseph's, however, provides 36% of the total charity, Medicaid, and Medicaid HMO care rendered to patients who reside in the Wesley Chapel area. Thus, the facilities within the BayCare System have a demonstrated track record of providing care without regard to a patient's resources. In light of the record, it is reasonable to expect BayCare to carry on in the same vein under the BayCare proposal. Utilization Schedule 5 relates to projected utilization after project completion. The projections in the schedule in Pasco- Pinellas' application were developed by looking at service area population, applying a use rate growth and taking a market share by individual zip code. They are based on the expectation that the hospital would be operating at approximately 70% occupancy in its third year of operation, which equates to an average census of approximately 56 patients. The assumptions contained in the schedule are reasonable. The utilization projections in Schedule 5 in Pasco- Pinellas' application are reasonable; they indicate that an 80- bed hospital is appropriate to meet the need for a new hospital in the Wesley Chapel area of the subdistrict. BayCare will able to achieve its projected utilization from its primary service area and from the 40% of its patients it expects to receive by way of in-migration. The population forecast and market share forecast for the primary service area are reasonable. While the support among local physicians is much stronger for the Pasco-Pinellas proposal, it is likely that they will admit patients to the BayCare proposed hospital since it will be in the Wesley Chapel area, the area of the subdistrict that is most suitable for a new hospital. The 40% projected in-migration from outside of the seven mile service area is a reasonable projection. It is reasonable to expect that the bulk of these admissions will come from USF physicians located at the USF north Hillsborough campus. Projected Revenues Schedule 7A governs projected revenues. The payor mix in Schedule 7A of Pasco-Pinellas' application is based on historic admission and patient days by payor class occurring in the proposed Pasco-Pinellas service area based on the most recent available AHCA data. Gross charges and net revenues were developed based on historical data from FHZ as reported to AHCA. These figures were inflated forward using a net increase over all in revenue payments of approximately 3%. The projected revenues including net revenues in Schedule 7A of Pasco- Pinellas' application are reasonable and consistent with the marketplace. The payor mix in BayCare's Schedule 7A was based on an analysis of patient discharge data from the proposed primary service area plus an analysis of the experience of other BayCare System facilities in the same market. It is a reasonable payor mix. It allows for consideration of the experience of BayCare System, including the high level of charity care and Medicaid and Medicaid HMO services and at the same time reflects that the Wesley Chapel area is more affluent and younger than other areas of Pasco and Hillsborough Counties. BayCare's revenue assumptions were based on an analysis of gross and net revenue per patient day from another BayCare System facility, South Florida Baptist. Financial class specific projected patient days were applied to derive a gross and net revenue number for each of the three pro forma years for the proposed project denominated by Schedule 7A as "Projected Operating Year 1, 2 and 3" and ending "12/31/11, 12/31/12 and 12/31/13" respectively as indicated by BayCare in the application. See BayCare 2, pp. 133-135. The 2006 South Florida Baptist gross and net revenue per patient day were trended forward for each of the three projected operating years to reach the projected revenue figures in Schedule 7A. The projected revenues in Schedule 7A of the BayCare application are reasonable. Projected Income and Expenses Schedule 8A in a CON application contains projected income and expenses for the proposal. Pasco-Pinellas' application used a methodology in Schedule 8 that its expert had used in other CON cases. The methodology is consistent with methodologies of other health care experts and has been accepted in recommended and final orders in CON cases. The projections in Schedule 8 of Pasco-Pinellas' application are appropriate and reasonable. BayCare's methodology used to project income and expenses in Schedule 8A is also appropriate and reasonable. BayCare's healthcare finance expert asked BayCare financial analysts to look at his initial projections. They recommended that expenses be increased in physical therapy, radiology lab and pharmacy and that expense be reduced in plant operations. The recommendations were accepted; the projections were adjusted. Medicare GME reimbursement in year 3 of operations was assumed to be $1.7 million. If no addition Medicare GME reimbursement were received, BayCare's proposal would still show a profit of $2.8 million by year 3. It is virtually certain, moreover, that some portion of the $1.7 million included in calculation of BayCare's income projections will be realized. However valid criticism of the inclusion of the $1.7 million, BayCare's proposal remains financially feasible in the long- term. Financial Feasibility Pasco-Pinellas proved the immediate and long-term financial feasibility of its proposal. The schedules in its application related to financial feasibility used reasonable methodologies that yielded reasonable projections. Analysis of capital costs and funding is contained in Schedules 1 through 3. Schedule 1 presents an accurate summation of total project cost. That figure, $121 million, is a reasonable and typical cost for a new 80-bed community hospital. The $149 million on Schedule 2 reflects an accurate summation of anticipated capital costs, including the hospital project and necessary capital expenditures for the first tow or three years of operation. Schedule 3 set forth the sources of funding, a combination of equity and debt financing, discussed below. Both UCH and Adventist are financially successful systems. They will have not difficulty funding the Pasco- Pinellas proposal. As of December 31, 2007, Adventist's net revenue was approximately $368 million. About $100 million in funds were available to UCH at the time of hearing to contribute to development of the project. Due to the financial strength of its members, Pasco- Pinellas will easily be able to fund the project through a combination of equity and debt. The equity, $45 million, will be provided equally by Adventist and UCH, $22.5 million each. The remaining $76 million will be financed through tax-free bonds issued by Ziegler Securities. The project is immediately financially feasible. The Pasco-Pinellas project is also financially feasible in the long-term. Schedule 8 in the application, year 3, shows the project will generate a return of approximately $5.3 million in revenue over expenses, an amount that "more than meet[s] the test for financial feasibility in the long-term." Id. Based on the sources of BayCare System, BayCare has access to the financial resources to implement its proposed hospital. Funding for the hospital will come from BayCare System on the basis of 50% debt and 50% equity investment. As of early 2008, BayCare System had approximately $1.2 billion in unrestricted cash on hand. BayCare System's financial strength will allow BayCare to obtain the financing it needs for the project. Schedule 3 of the BayCare application sets forth an accurate and reasonable statement of the sources of funds necessary to develop the project. The immediate financial feasibility of BayCare's proposal is demonstrated by the evidence presented by BayCare. By year three of the pro forma, the BayCare proposal is reasonably projected to generate a net income over expenses in the amount of $4,498,637. BayCare demonstrated that the proposal's long-term financial feasibility. Costs and Construction Methods The costs and methods of the proposed construction of the Pasco-Pinellas project are reasonable. The facility is adequately sized and programmed for the services included in the Pasco-Pinellas application. All of the departments, including central storage, fall within an appropriate benchmark range for community hospitals. The 2,300 square feet per bed is reasonable as are the construction costs when compared to similar community hospitals. The proposed Pasco-Pinellas facility meets the codes for all of the services included in the application. The design of the Pasco-Pinellas facility enable expansion. The designed expansion capabilities are reasonable, logical and appropriate to meet the needs of the Wesley Chapel community. The drawings contained in the CON application show an efficient community hospital. The departments allow for efficient intra-department circulation and department-to- department circulation. There are adequate separation of public and staff flow corridors. All of the areas and departments as shown in the Pasco-Pinellas plans are code compliant. The layout of the patient rooms is consistent with industry standards for the design of single patient rooms. The number and size of the operating rooms are adequate and appropriate for an 80-bed community hospital not offering tertiary services. The emergency department, including the trauma room, complies with code and its layout is adequate and appropriate for an 80-bed hospital. The ambulance entrance in relation to the trauma bay allows for efficient location of patients based on acuity level. The number of treatment beds, treatment bays, including observation areas, provide adequate emergency department capacity. The Schedule 1 costs set forth in the BayCare application are reasonable. These costs include projected costs associated with necessary medical equipment. The medical equipment costs set forth in Schedule 1 are reasonable and BayCare has properly accounted for the items and costs of equipment necessary to operate the hospital. The Schedule 9 construction costs of approximately $180 million are reasonable as are the construction costs per square foot ($347 versus $325 for Pasco-Pinellas). Contingencies and escalation factors have been built into the projected costs. Facilities, Sites, Related Costs At the time the UCH and Adventist joint venture was formed, UCH had a parcel of land under contract located on State Road 54 across from the Saddlebrook Resort (the "UCH Parcel"). When it filed its application, Pasco-Pinellas hoped the UCH Parcel would serve as the site of its hospital. In fact, Pasco- Pinellas touted the location of the parcel for meeting the need of the growing population in Pasco County when it represented in the application that the UCH Parcel is the center point of the Wesley Chapel area. Close to Interstate 75, the UCH Parcel is a good location for a hospital. Pasco-Pinellas' aspiration for the use of the parcel was defeated, however, when the Pasco County denied a request to re-zone the UCH Parcel for use as a hospital. After the inability to have the UCH Parcel re-zoned, Pasco-Pinellas changed the site for the hospital to a parcel owned by FHZ (the "Pasco-Pinellas Site"). Located on Bruce B. Downs Boulevard, a major north-south corridor in the Wesley Chapel area, the site is 51.5 acres. The Pasco-Pinellas Site had been purchased by FHZ in 2001 with the intention of using it for a hospital. Subject to a height variance to allow a seven-story building, the site is zoned for special use as a hospital and related medical uses. The site has good visibility and access from Bruce B. Downs Boulevard as evidenced by its compliance with the State Road 581 (Bruce B. Downs Boulevard) access management plan. It meets other regulatory requirements such as the minimum spacing criteria for Pasco County. The Pasco-Pinellas Site is governed by a development order associated with the Wiregrass Ranch Development of Regional Impact (the "Wiregrass DRI DO"). The Wiregrass DRI DO "indicates that the phasing schedule assumed 100 hospital beds would be developed within the building phase." Tr. 597. As explained at hearing by Lara Daly, Pasco-Pinellas' expert in civil engineering and property site development, there are other aspects of the Wiregrass DRI DO, "like trade-off matrices" and "entitlement advancements" that indicate "entitlements are not limited on a parcel-by-parcel basis." Tr. 598. The assumption, therefore, does not necessarily restrict the number of hospital beds on the Pasco-Pinellas Site; rather it allows impacts associated with 100 hospital beds. The number of allowable beds may be increased following action taken under other provisions of the Wiregrass DRI DO. A significant portion of the Pasco-Pinellas Site is wetlands: some of low quality, some of high quality. The higher quality wetlands, referred to in the record as "a high quality category 1 wetland as defined by Pasco County," tr. 552, (the "Category 1 Wetland") are on the north and east perimeter of the site. The project is designed so as to have no impacts on the Category 1 Wetland. The only potential impact to these high quality wetlands is if there were a county-mandated road to be built in their vicinity. The lesser quality wetlands located in the interior of the site are herbaceous in nature or an open water feature that is "an older borrow pit that naturalized over time." Tr. 552-53. These lower quality wetlands constitute roughly 11.5 acres of the site. They will be impacted by the project but it is reasonable to expect that the impacts will be permitted. As Ms. Daly put it at hearing, "[a]fter reviewing, running stormwater models, looking at the proposed wetland impacts, coming up with appropriate mitigation ratios based on our experience elsewhere on the Wiregrass site, the site will accommodate all the necessary wetland and floodplain historic basin compensation . . . ." Tr. 550. The costs contained in Schedule 1 of the application were arrived assuming the use of the UCH Parcel as the site for the Pasco-Pinellas project. The Pasco-Pinellas Site requires expenditures for site preparation and other expenditures, such as wetland mitigation, related to the site that were not required had the UCH Parcel been used. For example, three potential foundation systems have been suggested for the hospital because of the wetland and subsurface conditions on the Pasco-Pinellas Site had the UCH Parcel been the site. Using the most expensive of the three, however, would not cause Pasco- Pinellas to exceed the construction costs contained in Schedule 1 of the CON Application. The land acquisition costs were reasonably projected to be less for the Pinellas-Pasco Site than for the UCH Parcel as reflected in the application. All told, the estimated project cost using the Pasco-Pinellas site was not materially different from the cost projected in the application and presented the possibility of being less than the $121 million reflected in the application. Likewise, the equipment cost figure shown in Schedule 1 of the Pasco-Pinellas application is reasonable and achievable. The total of the costs for the project sited at the Pasco-Pinellas Site, despite the change of site that occurred after the filing of the application, should not exceed the total of the costs listed in the Pasco-Pinellas application. The preponderance of the evidence is that the Pasco- Pinellas Site should ultimately qualify as an appropriate, developable site for the Pasco-Pinellas project. The BayCare site, north of Highway 56 and bordering I-75, (the "BayCare Site") includes two parcels of 54 and 17 acres. The 54 contiguous acres will be used for the hospital, outpatient services, and a planned medical office building. The 17 acres will be used for research space, physician office space, and academic training space necessary for the research and education function at the project. BayCare has the appropriate zoning and approvals necessary to develop the hospital. The hospital will have all private beds. It will be fully digital and will rely on electronic medical records. The BayCare Site is well suited for construction of the hospital and related buildings. The available footprint and design of the hospital, which includes shelled-in space, will readily allow for future expansion of the hospital up to 300 beds. Design of the BayCare facility is based on principles of family-centered care, flexibility to allow for change and future growth, efficiency, a quality of environment for teaching, a sustainable, green building, and patient safety. A "health building" with improved environmental quality and energy efficiency, the facility will seek LEED certification given to facilities constructed to have minimal adverse environmental impact. In keeping with the teaching function intended by the application, the facility's design includes additional work space, reading areas, sleep areas and conference rooms to facilitate teaching. Overall, the BayCare facility is twice as large as the Pasco-Pinellas facility. Size has its advantages. For example, it allows for larger treatment patient areas. But the facility is much more expensive to build. It is reasonably projected to cost more than $180 million above the costs associated with the Pasco-Pinellas facility which is more than twice as much. The high expense associated with the BayCare facility is shown by its cost per bed: in excess of $2 million-- much more than the cost per bed of the Pasco-Pinellas facility.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Agency for Health Care Administration approve CON 9975, Pasco-Pinellas' application for a new hospital in AHCA Subdistrict 5-2, and deny CON 9977, BayCare's application for a new hospital in the same subdistrict. DONE AND ENTERED this 28th day of October, 2008, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of October, 2008. COPIES FURNISHED: Richard J. Shoop, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Building 3 Mail Station 3 Tallahassee, Florida 32308 Craig H. Smith, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Building 3 Mail Station 3 Tallahassee, Florida 32308 Karin M. Byrne, Esquire Agency for Health Care Administration 2727 Mahan Drive, Building 3 Mail Station 3 Tallahassee, Florida 32308 Stephen K. Boone, Esquire Boone, Boone, Boone, Koda & Frook, P.A. 1001 Avenida Del Circo Post Office Box 1596 Venice, Florida 34284 Jonathan L. Rue, Esquire Parker, Hudson, Rainer & Dobbs, LLP 1500 Marquis Two Tower 285 Peachtree Center Avenue Northeast Atlanta, Georgia 30303 Robert A. Weiss, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 R. David Prescott, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551

Florida Laws (5) 26.56408.034408.035408.039408.07
# 2
ENGLEWOOD COMMUNITY HOSPITAL, INC., D/B/A ENGLEWOOD COMMUNITY HOSPITAL AND FAWCETT MEMORIAL HOSPITAL, INC., D/B/A FAWCETT MEMORIAL HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION, 04-003027CON (2004)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 26, 2004 Number: 04-003027CON Latest Update: Apr. 13, 2006

The Issue The issue is whether the Agency should approve the Certificate of Need applications filed by Manatee Memorial and/or HMA, each of which proposes to establish a new acute care hospital to serve the city of North Port in Sarasota County, Acute Care Subdistrict 8-6.

Findings Of Fact Parties Manatee Memorial Manatee Memorial, the applicant for CON 9767, is a subsidiary of Universal Health Services, Inc. (UHS). UHS is a publicly-traded corporation that is headquartered in Pennsylvania. UHS is a financially-sound company. In 2003, its net revenues were approximately $3.6 billion, its net operating income was $355.7 million, and its after-tax net income was $199.2 million. Manatee Memorial is also financially-sound despite a net loss of $2.5 million in 2003. It had net income of $13.9 million in 2002, and its net revenues increased from $164.5 million in 2002 to $180.9 million in 2003. As of December 31, 2003, Manatee Memorial’s total assets exceeded its total liabilities by $56.3 million. UHS operates approximately 100 healthcare facilities in the United States and abroad. The facilities operated by UHS include behavioral health/psychiatric facilities, surgery centers, and 37 acute care hospitals. Three of the acute care hospitals operated by UHS are in Florida. They are Wellington Regional Medical Center in south Palm Beach County, Manatee Memorial Hospital (MMH) in Bradenton, and Lakewood Ranch Medical Center (Lakewood Ranch) in Manatee County, near the Manatee County/Sarasota County border. MMH and Lakewood Ranch are operated under a single license issued by the Agency. Manatee Memorial is the licensee. MMH started as a community hospital in the 1950’s. It was acquired by UHS in 1996 and has undergone significant capital improvements since the acquisition. MMH has 319 beds. It provides tertiary services, including open-heart surgery (OHS) and interventional cardiology services. It has a Level II neonatal intensive care unit (NICU), and a full-service emergency department (ED) that operates 24 hours a day, 7 days a week (24/7). Lakewood Ranch opened in September 2004. It has 120 beds and a 24/7 ED. It offers obstetrical (OB) services, but it does not have any NICU beds. It does not provide any tertiary services. MMH and Lakewood Ranch are accredited by the Joint Commission on Accreditation of Healthcare Organizations (JCAHO). MMH and Lakewood Ranch accept all patients without regard to their ability to pay. MMH has been recognized as a “Top 100” hospital by Solucent, and it has received other accolades for the quality of care and community support that it provides. There is significant overlap in the medical staffs at Lakewood Ranch and MMH. The Lakewood Ranch CON application projected that the hospital would have an average daily census (ADC) of 46.8 in its first year of operation, which equates to a 39 percent utilization rate. Manatee Memorial’s witnesses acknowledged at the hearing that Lakewood Ranch would likely not meet those projections. The total cost of Lakewood Ranch was $48.7 million, which is $8.1 million more than was projected in the CON application for the hospital. Approximately $2.9 million of the “cost overrun” was attributed to additional IT systems beyond those specified in the CON application. HMA HMA, the applicant for CON 9768, is a subsidiary of Health Management Associates, Inc. (HMA, Inc.) HMA, Inc., is a publicly-traded corporation that is headquartered in Naples. It operates 57 hospitals in 16 states. HMA, Inc., is a financially-sound company. Its net revenues increased from $1.1 billion in 1998 to $3.2 billion in 2004. Its net income increased from $137 million to $325 million over that same period. HMA, Inc., operates 14 acute care hospitals and two behavioral health/psychiatric facilities in Florida. It also has CON approval for new acute care hospitals in Brooksville and Naples. Most of the hospitals operated by HMA, Inc., are in non-urbanized areas. According to its 2004 annual report, HMA, Inc., “focuses on non-urban America because many of those communities are underserved medically, have populations that are growing faster than the national average, and offer competitive advantages compared to major urban areas.” The Florida hospitals operated by HMA, Inc., include Charlotte Regional Medical Center (Charlotte Regional) in Punta Gorda, Peace River Regional Medical Center (Peace River) in Port Charlotte, and Venice Hospital in Venice. Charlotte Regional has 208 beds, including 156 acute care beds and 52 psychiatric beds. It has a 24/7 ED and it offers OHS and inpatient psychiatric care. It does not offer OB services. Peace River has 212 beds, but only 170 of the acute care beds were available for use at the time of the final hearing. It has a 24/7 ED and a 20-bed skilled nursing unit. It offers OB services, but it does not have any NICU beds. Venice Hospital has 342 licensed beds. It has a 24/7 ED and a skilled nursing unit. It offers OHS and inpatient rehabilitation services. A majority of the beds at Charlotte Regional, Peace River, and Venice Hospital are in semi-private rooms. Charlotte Regional, Peace River, and Venice Hospital are all accredited by JCAHO, and they all accept patients without regard to their ability to pay. Charlotte Regional has been recognized as one of the top 100 cardiovascular hospitals in the country. Peace River and Venice Hospital were formerly not-for- profit hospitals operated by the Bon Secuors organization. Peace River was formerly known as Bon Secours St. Joseph’s Hospital (BS-St. Joe) and Venice Hospital was formerly known as Bon Secours Venice Hospital (BS-Venice). HMA, Inc., entered into an agreement to acquire BS-St. Joe and BS-Venice in November 2004. The acquisition, which was completed in February 2005, also included a hospital in Virginia, a nursing home in Port Charlotte, and “health parks” in northern Charlotte County, Venice, and North Port. BS-St. Joe and BS-Venice were not profitable at the time that they were acquired by HMA. The financial performance of those hospitals has improved significantly under HMA’s management, primarily through better management of accounts receivable. Englewood Englewood is owned and operated by HCA, Inc. (HCA). HCA is a publicly-traded corporation and the largest for-profit acute care hospital chain in the country. Englewood is located in the city of Englewood, which is in Sarasota County on the Cape Haze Peninsula near the Sarasota County/Charlotte County line. Englewood has 100 beds and a 24/7 ED. It does not offer OB services. Its largest service lines are cardiology, general medicine, orthopedics, and pulmonology. Englewood is accredited by JCAHO. It has received special accreditation for its chest pain center and certification from the American Stroke Association for its stroke care. Englewood accepts all patients without regard to their ability to pay. Englewood’s building has one floor. All of its beds are in semi-private rooms, except for four isolation rooms. Englewood is authorized to use its acute care beds as “swing beds” to provide skilled nursing care. Englewood’s primary service area (PSA) includes the Cape Haze Peninsula. Its secondary service area (SSA) includes south Venice and the mostly-undeveloped portion of North Port to the west of the Myakka River in zip code 34287. Englewood’s census ranges from 30 to 90 patients, depending upon the time of the year. During the “season” in 2005, its census peaked at 93 patients and averaged 73 patients. At the time of the final hearing, Englewood’s census was in the mid-50’s. Fawcett Fawcett is owned and operated by HCA. Fawcett is located in Port Charlotte, directly across the street from Peace River and five miles south of the city of North Port. Fawcett has 238 beds, a 24/7 ED, a 20-bed intensive care unit (ICU), a 20-bed comprehensive medical rehabilitation (CMR) unit, and a diagnostic cardiac cath lab. Fawcett does not offer OB services. It will be opening an ambulatory surgical center in December 2005. Fawcett is accredited by JCAHO, and it was recently designated as a primary stroke center. Its oncology unit is affiliated with the Moffitt Cancer Center. Fawcett accepts all patients without regard to their ability to pay. Fawcett’s building has four floors. All of its beds are in semi-private rooms, except for the ICU beds and two isolation rooms. Fawcett suffered significant damage during Hurricane Charley in August 2004. The hospital’s fourth floor, which had 78 beds (including 10 ICU beds), was closed as a result of the damage. At the time of the final hearing, Fawcett was still in the process of repairing the damage to the fourth floor, and it had only 165 beds (including the CMR beds and 14 ICU beds) available for use. Fawcett’s PSA includes two of the North Port zip codes, 32486 and 32487. Those zip codes encompass the vast majority of the city’s geographic area. Agency The Agency is the state agency that administers the CON program. It is responsible for reviewing and taking final agency action on CON applications. Application Submittal and Review and Preliminary Agency Action Manatee Memorial and HMA each filed letters of intent and CON applications in the February 2004 batching cycle for hospital beds and facilities. Each application sought Agency approval to establish a new acute care hospital in Subdistrict 8-6 to serve the city of North Port. The fixed need pool published by the Agency for the February 2004 batching cycle identified a need for zero new acute care beds in Subdistrict 8-6. There were no challenges to the fixed need pool. HMA’s letter of intent was filed in the “grace period” established by Florida Administrative Code Rule 59C-1.008(1)(d) in direct response to Manatee Memorial’s earlier-filed letter of intent. Manatee Memorial’s application was designated CON 9767, and HMA’s application was designated CON 9768. The applications complied with the technical submittal requirements in the statutes and Agency rules, and they were properly accepted for review by the Agency. The Agency comparatively reviewed the CON applications filed by Manatee Memorial and HMA. The Agency’s review of the applications complied with the applicable statutes and Agency rules. The Agency’s review culminated in a State Agency Action Report (SAAR) issued on June 11, 2004. The SAAR recommended denial of Manatee Memorial’s CON 9767 and approval of HMA’s CON 9768. The SAAR was issued prior to HMA’s acquisition of BS- St. Joe and BS-Venice. The Agency’s preference for HMA’s application over Manatee Memorial’s application was primarily based upon its assessment that HMA’s projected utilization was more reasonable and attainable than Manatee Memorial’s projected utilization. The SAAR recommended that the approval of HMA’s application be conditioned upon HMA providing 6.9 percent of the patient days at its North Port hospital to Medicaid patients and 2.9 percent of the patient days to charity patients. Those percentages were derived from the payor-mix assumptions used in the revenue projections in Schedule 7A of HMA’s CON application. The Agency published notice of its decisions on the CON applications in the Florida Administrative Weekly on June 25, 2004. The petitions for administrative hearing were all timely filed. The Agency reaffirmed its support for HMA’s application and its opposition to Manatee Memorial’s application at the final hearing through the testimony of Jeffrey Gregg, the bureau chief over the Agency’s CON program. Mr. Gregg testified that the Agency’s support of HMA’s application is unaffected by HMA's acquisition of BS-St. Joe and BS-Venice even though he acknowledged that the acquisition may have implications on the competition for acute care services in market in and around the city of North Port. Subdistricts 8-1 and 8-6 District 8 is comprised of Sarasota, DeSoto, Charlotte, Lee, Glades, Hendry, and Collier Counties. There are six subdistricts in District 8, only two of which are relevant to this case. They are Subdistricts 8-1 and 8-6. Subdistrict 8-6 is comprised of Sarasota County. There are no other counties in the subdistrict. There are four acute care hospitals in Subdistrict 8-6: Sarasota Memorial Hospital (Sarasota Memorial), Doctors Hospital of Sarasota (Doctors), Venice Hospital, and Englewood. Sarasota Memorial and Doctors are in northern Sarasota County in the city of Sarasota. Venice Hospital and Englewood are in southern Sarasota County. Sarasota Memorial is a not-for-profit, taxpayer supported hospital. Doctors is an HCA hospital. Sarasota County is bordered on the south by Charlotte County, which is the only county in Subdistrict 8-1. There are three acute care hospitals in Subdistrict 8-1: Peace River, Charlotte Regional, and Fawcett. There are a total of 1,776 licensed acute care beds at the seven hospitals in Subdistricts 8-1 and 8-6. That number has remained constant since at least 2002. The overall annual occupancy rate for the hospitals in Subdistricts 8-1 and 8-6 was 49.53 percent in 2002. In 2003 and 2004, the overall annual occupancy rate was approximately 46.4 percent. Between 2002 and 2004, Charlotte Regional had the highest occupancy rate of any of the hospitals in Subdistricts 8-1 and 8-6, but its occupancy rate did not exceed 67 percent in any of those years. In 2004, its annual occupancy rate was only 56.6 percent. The occupancy rates at the existing hospitals is higher during the “season,” but the evidence was not persuasive that any of the existing hospitals are routinely at or over capacity during the “season” or at any other time during the year. In 2002, there were a total of 321,696 patient days at the hospitals in Subdistricts 8-1 and 8-6. By 2004, the total number of patient days had declined to 301,099. Some, but not all, of that decline is attributable to Hurricane Charley, which directly hit the Port Charlotte area in August 2004 causing significant damage to Fawcett and disrupting service at the other hospitals in the area. There are no geographic barriers between Sarasota and Charlotte Counties. The service areas of the hospitals in southern Sarasota County and the hospitals in northern Charlotte County overlap, and there is significant cross-migration of patients between the counties. There is significant competition for acute care services in both Charlotte and Sarasota Counties. No hospital organization has a dominant market position. In 2004, for example, Sarasota Memorial had a 47 percent market share in Sarasota County, the HCA hospitals had a 22.8 percent market share, and the HMA hospitals (including the former Bon Secours hospitals) had a 21.4 percent market share. In the combined Sarasota County/Charlotte County “market,” the HMA hospitals (including the former Bon Secours hospitals) had a 33.7 percent market share, Sarasota Memorial had a 31.4 percent market share, and the HCA hospitals had a 25.6 percent market share. City of North Port (1) Generally The city of North Port is located in southern Sarasota County. The southern border of the city is the Sarasota County/Charlotte County line. The city roughly corresponds to the area encompassed by zip codes 34286, 34287, and 34288. Zip code 34289 is also a North Port zip code, but there is no geographic area assigned to that zip code. The city was platted in the 1960’s by General Development Corporation. The plats covered approximately 75 square miles of land and included approximately 70,000 residential lots, only 20 percent of which have been developed. There are also several large "developments of regional impact" under construction or in the planning stages within the city that together are projected to add at least 15,000 more residential units to the city over the next 15 to 20 years. A number of the streets that were constructed when the city was originally platted have fallen into disrepair, which hampers the provision of police, fire, and EMS. The city is currently conducting a comprehensive street inventory to assess the extent of the problem. Additional undeveloped land has been annexed into the city over the years, which has increased the city's size to 103 square miles. Currently, North Port is the fourth largest city in the state in terms of landmass. The Myakka River runs through the western portion of the city. The land to the west of the Myakka River is mostly undeveloped and includes the Myakka State Forest. Residential lots and open space make up approximately 95 percent of the city’s platted land area. The non-residential uses are clustered in five “activity centers” around the city. Major roadways through North Port include Interstate 75 (I-75), which runs east-west in the vicinity of the northern city limit and then north-south in the vicinity of the eastern city limit; U.S. Highway 41 (US 41), which runs parallel to I-75 in the southern portion of the city; Price Boulevard, which runs parallel to I-75 and US 41 through the center of the city; and Toledo Blade Boulevard and Sumter Boulevard, which run north- south near the center of the city. Toledo Blade, Sumter, and Price Boulevards are in need of widening, and there are several intersections on those roads that are operating below their adopted levels of service. It is not clear when the widening will occur, and the city’s concurrency management ordinance may soon require a moratorium on the issuance of building permits in the geographic areas impacting those intersections. The city is also in the process studying how to control its growth. The possibility of a moratorium is part of that study, but no recommendations had been formulated on that issue as of the date of the hearing. As a result, the likelihood of a moratorium on building permits in areas other than those which impact the intersections referenced above is unknown. Two of the activity centers are located on Toledo Blade Boulevard, two are located on Sumter Boulevard, and the other is located US 41. Hospitals are considered a permitted use in the activity centers. There is currently no acute care hospital or 24/7 urgent care facility in North Port. The North Port Health Park, which was acquired by HMA in February 2005 along with BS-St. Joe and BS-Venice, offers a variety of outpatient services and diagnostic procedures (e.g., echocardiography, mammograms, and “CAT scans”). It also includes approximately 20 physician offices and a clinical laboratory. The volume of diagnostic procedures at the North Port Health Park increased significantly between 1999 and 2004. There has also been steady growth in its laboratory volume over that period. Patients frequently come to the North Port Health Park with conditions requiring emergency services or hospitalization, which requires an ambulance to be called to transport the patient to one of the existing hospitals in the area. North Port city officials have been actively pursuing the establishment of a hospital in the city for several years. In 2003, the city engaged health planner Gene Nelson to study the feasibility of a hospital in the city. At the time, the City was considering filing its own CON application. Mr. Nelson presented a report to the City Council in June 2003, in which he concluded that it was “premature” for a hospital in North Port at that time. He projected that a hospital in North Port could “eventually” reach census levels to support a 59-bed to 74-bed hospital, and that even under more “aggressive” or “optimistic” assumptions, there would be a need for only 84 beds in 2010. The city ultimately decided to devote its efforts to encouraging an existing hospital company to build a hospital in the city and, in that regard, the City Commission voted to actively support those efforts through a “locally based campaign to collect letters of support for the hospital.” In January 2004, the City Council adopted a resolution reaffirming its “objective” to get a hospital in the city and expressing its support for Manatee Memorial’s proposal to build the hospital. There is considerable support for the establishment of a hospital in North Port from the residents of the city. The Agency received more than 20,000 letters and petitions from city residents urging the Agency to approve a hospital in the city. A community’s desire for a new hospital does not mean there is a “need” for a new hospital. Under the CON program, the determination of need for a new hospital must be based upon sound health planning principles, not the desires of a particular local government or its citizens. There are approximately 40 physicians who practice in North Port, but only nine of those physicians have full-time practices in the city. The others have part-time practices, meaning that they are in their North Port office for only part of the week. Most of the physicians practicing in North Port are primary care physicians, but there are also specialists in cardiology, oncology, general surgery, radiology, and other fields. Many of the physicians have their offices in the North Port Health Park. Population The city of North Port has grown steadily since 1970. In 2000, according to the U.S. Census Bureau, the city’s population was 22,797. Approximately 31 percent of the city’s residents are in the 65 and older (65+) age cohort. The largest percentage of the residents in the 65+ age cohort are in zip code 34287, which is growing at a slower rate than the other zip codes in the city. The median age in the city is declining. In 1990, the median age was 49, and in 2000, the median age was 41. In 2004, according to the University of Florida’s Bureau of Economic and Business Research (BEBR), the city’s population was 35,721. BEBR publishes the “official” population estimates for cities and counties in Florida. It does not project future populations and it does not provide population data by zip code. Claritas is a national demographic research firm. It projects future population by zip code, by age cohort, and with other demographic information. Health planners commonly rely upon the population projections from Claritas in preparing CON applications. Claritas projects future population in five-year increments, and it updates its population projections annually. At the time Manatee Memorial and HMA filed their CON applications, the most current Claritas data was for the period of 2003-2007. Population projections beyond 2007 were extrapolated based upon the annual population increases reflected in the available Claritas data. At the time of the final hearing, the most current Claritas data was for the period of 2004-2008. The North Port Planning and Zoning Department uses its own methodology to project future population for the city. The population projections are used in the city’s capital improvement planning and in the development of its comprehensive plan. The city’s methodology uses Census data as the starting point and then projects the future population by using a “rolling average” of the number of residential building permits issued in the previous five years to develop a projected number of residential building permits for each future year. A factor of 2.48 individuals per household (which is a North Port- specific figure from the U.S. Census Bureau) is then used to project the annual increase in population for each year in the future. A factor of 10 percent is added to the projection for seasonal residents. The evidence was not persuasive that the projections based upon the city's methodology are reliable. The city’s methodology typically results in population projections that are materially higher than the official BEBR estimates. For example, the city’s methodology projected a 2004 population of 39,662, which is approximately 11 percent higher than the official BEBR estimate of 35,721. The city’s methodology is based upon building permits, not certificates of occupancy or some other measure that would indicate that the residence was completed and, more importantly, inhabited. The city’s methodology also assumes continued growth at the historical rate and does not take into account the possibility of a moratorium on the issuance of building permits, which was being studied by the city at the time of the final hearing. The Claritas population projections are not entirely accurate either. Claritas typically under-projects future population in fast-growing areas, such as North Port. For example, the 2003-2007 Claritas data projected that the city’s 2004 population would be 32,487, which was approximately 9.1 percent lower than the official BEBR estimate of 35,721. The variance between the Claritas population projections and the projections based upon the city’s methodology are more pronounced in the later years. In 2010, for example, the city’s projected population based upon an extrapolation of the 2003-2007 Claritas data was 39,446 as compared to 72,066 based upon the city’s methodology. The population projections based upon the 2003-2007 Claritas data are too low and the projections based upon the city’s methodology are too high. On balance, the most reasonable population projections for the city of North Port contained in the record are those in Exhibit EF-10. Those projections, which were based upon the updated Claritas data for 2004-2008 and then extrapolated for 2009 and 2010, are as follows: 36,733 in 2004; 38,613 in 2005; 40,601 in 2006; 42,703 in 2007; 44,928 in 2008; 47,283 in 2009; and 49,777 in 2010. The 2004-2008 Claritas data better takes into account the city’s historically-high growth rate than does the 2003-2007 Claritas data, but it results in a more realistic projection of the city’s 2010 population than does the city’s methodology. Hospital Discharges There were 4,473 non-tertiary patients from the North Port zip codes discharged from a hospital in Florida in 2004.1 Only 1,356 (or approximately 30.3 percent) of the non-tertiary patients from the North Port zip codes were discharged from a hospital in Subdistrict 8-6, which means that almost 70 percent of the patients “out-migrated” from the subdistrict. Approximately 86.9 percent of the patients who “out-migrated” were discharged from a hospital in Subdistrict 8-1, which is adjacent to the city’s southern border. Overall, in 2004, approximately 91 percent of the non-tertiary patients from the North Port zip codes were discharged from a hospital in Subdistrict 8-1 (60.5 percent) or Subdistrict 8-6 (30.3 percent). Those percentages were similar in 2002 and 2003. The average length of stay (ALOS) related to those discharges was approximately 4.5 days, which means that North Port patients generated approximately 20,129 non-tertiary patient days in 2004. If a hospital had captured 100 percent of North Port’s non-tertiary patients in 2004, it would have had an ADC of 56 patients. There were 499 OB patients from the North Port zip codes discharged from a Florida hospital in 2004. Those discharges resulted in 1,172 OB patient days, which means that the ALOS for the OB patients from the North Port zip codes was 2.34 days. Approximately 95 percent of the North Port OB patients were discharged from either Sarasota Memorial (56.5 percent) or BS-St. Joe (38.3 percent), which is now Peace River. If a hospital captured 100 percent of the North Port OB patients in 2004, its OB unit would have had an ADC of 4 patients. The Proposed North Port Hospitals (1) HMA Generally HMA’s proposed North Port hospital (hereafter “North Port HMA”) will be an 180,167 square foot (SF) facility with 80 beds. All of the beds at North Port HMA will be in private rooms. The rooms are large enough to be converted into semi- private rooms, if necessary. The design of North Port HMA is similar to that of other HMA hospitals, but the size of the hospital and scope of the services offered at North Port HMA was tailored based upon North Port's demographics. North Port HMA will have a 9-bed OB unit, a 12-bed ICU, a 24/7 ED, and it will offer some outpatient services. The hospital will not have a cardiac cath lab or a dedicated pediatric unit, and it will not offer tertiary services. The total project cost for North Port HMA will be approximately $78 million, or $975,730 per bed. The project will be funded by HMA, Inc., from its “existing cash, future cash flow, and possible proceeds from the issuance of debt [by HMA, Inc].” HMA’s CON application includes a letter from the Corporate Comptroller of HMA, Inc., confirming that HMA, Inc., “will provide any and all funding or financial resources which may be required for the completion and continued operation of [North Port HMA].” HMA did not commit in its CON application to build North Port HMA in the city of North Port, but its witnesses testified at the final hearing that the hospital will be built in the city. The precise location of the hospital was not specified. North Port HMA will have three floors. The first floor will include the ED, operating rooms, radiology department, the clinical laboratory, outpatient services, and ancillary space such as kitchen/dining, medical records, and administrative offices. The second floor will include patient rooms and the ICU. The third floor will include patient rooms. North Port HMA is designed and engineered for vertical expansion, and it will be “pre-stressed” for additional floors. North Port HMA will utilize a picture archive communication system (PACS) and other digital IT systems. Patient clinical information will be maintained electronically, updated at the point of care, and will be available to clinicians through a secure network in the hospital. Service Area and Utilization Projections The PSA for North Port HMA is the city of North Port, which is comprised of zip codes 34286, 34287, 34288, and 34289. The PSA is reasonable. A SSA is not geographically defined, but HMA projected in the application that 20 percent of the admissions at North Port HMA would come from outside of the PSA. The projected 20 percent in-migration from the SSA is somewhat optimistic for a non-tertiary community hospital, but it is nevertheless reasonable under the circumstances.2 HMA used Claritas' population projections to project the utilization of North Port HMA. The utilization projections assumed that North Port HMA will have a 55 percent market share in the PSA in its first year of operation and a 70 percent market share in the PSA in its second year of operation. These market share assumptions are reasonable and attainable based upon HMA's historical experience and the considerable community support for a hospital in the city. North Port HMA was projected to open in 2007, and HMA’s CON application includes utilization projections for the hospital’s first two years of operation in 2007 and 2008. The application projected that North Port HMA would have 15,695 patient days in its first year of operation and 20,629 patient days in its second year of operation, which is an ADC of 43 patients and a utilization rate of 53.8 percent in year one (2007) and an ADC of 57 patients and a utilization rate of 70.6 percent in year two (2008). The methodology used to calculate those figures was as follows: first, the projected patients from the PSA were calculated by applying the 2003 age-cohort specific use rates to the PSA’s projected 2007 and 2008 populations; then, the market share assumptions were applied and a factor of 20 percent was added to reflect “in-migration” from the SSA; and finally, an ALOS of 4.6 was used to convert the discharges to patient days. The 4.6 ALOS, which is based upon the actual 2003 discharge data for residents of the PSA, is reasonable even though the 2004 discharge data reflects a slightly lower ALOS of 4.5. Use of age-cohort specific use rates to project future discharges is reasonable. However, application of the 2003 use rates to the projected 2007 and 2008 populations is not reasonable because the median age in the city of North Port is declining, and as the population’s age declines, so does its use rate. Nevertheless, the utilization projections for North Port HMA are reasonable and attainable. The utilization projections in HMA's CON application are more conservative than the projections based upon the updated Claritas population projections, a declining use rate, and the lower 2004 ALOS of 4.5.3 (2) Manatee Memorial (a) Generally Manatee Memorial’s proposed North Port hospital (hereafter “North Port Hospital”) will be a 200,000 SF facility with 120 beds. It will have a mix of private and semi-private rooms. North Port Hospital will have a 20-bed “women’s center,” a 20-bed ICU/critical care unit (CCU), a 24/7 ED, and a diagnostic cardiac cath lab. It will not offer tertiary services. The “women’s center” will be more than an OB unit. It will offer range of services related to women’s health, including general gynecological care, pre-natal and post-natal care, delivery of babies, mammography and other breast cancer services, and gynecological surgery. The total project cost for North Port Hospital will be approximately $59.7 million, or $497,448 per bed. The funding for the project will be provided by UHS from its “net cash flow from operation.” Manatee Memorial’s CON application includes a letter from UHS’s Senior Vice President and Chief Financial Officer confirming that UHS will finance North Port Hospital. Manatee Memorial committed in its CON application to build North Port Hospital in the city of North Port, but no specific site was identified. Manatee Memorial has not yet acquired or contracted to purchase any property in the city. North Port Hospital will have three floors. The first floor includes the “women’s center,” ED, laboratory, outpatient services, cardiac cath labs, surgery suites, and ancillary space such as medical records, kitchen/dining, and administrative offices. The second floor includes the ICU/CCU, pediatric unit, and patient rooms. The third floor includes patient rooms. The design, space plan, methods of construction, and equipment at North Port Hospital will be similar to that at Lakewood Ranch. Indeed, Manatee Memorial’s witnesses described North Port Hospital as a “mirror image” of Lakewood Ranch, which is also a 120-bed non-tertiary hospital with a 20-bed ICU/CCU and a 20-bed “women’s center.” North Port Hospital is designed for horizontal expansion, which causes less disruption to the ongoing operations of the hospital than does vertical expansion. North Port Hospital will utilize a PACS and other “state of the art” IT systems. Patient clinical information will be maintained electronically, updated at the point of care, and will be available to clinicians through the hospital’s secure wireless network. The mechanical and engineered systems at North Port Hospital are appropriate, as is the hospital's design.4 Manatee Memorial will not fully equip North Port Hospital at start-up. Instead, as it did with Lakewood Ranch, it will minimally equip each patient room with the required equipment (e.g., bed, headwall, etc.) but it will only provide the specialized equipment necessary to serve the projected patient census for the first year of operation. Additional equipment will be incrementally added as census increases. (b) Service Area and Utilization Projections The PSA and SSA for North Port Hospital, which are the same as the PSA and SSA for North Port HMA, are reasonable. North Port Hospital was projected to open in 2008, and Manatee Memorial’s CON application includes utilization projections for the first three years of operation, 2008-2010. The utilization projections assume that North Port Hospital will have a 45 percent market share in the PSA in its first year of operation, a 60 percent market share in its second year of operation, and a 70 percent market share in its third year of operation. These market share assumptions, which are slightly more conservative than those projected for North Port HMA, are reasonable and attainable. Manatee Memorial projected in its CON application that North Port Hospital would have 17,413 patient days in 2008; 25,798 patient days in 2009; and 33,327 patient days in 2010. Those patient days equate to ADCs of 48 patients in 2008, 71 patients in 2009, and 92 patients in 2010, which, in turn, equate to utilization rates of 39.7 percent in 2008, 58.9 percent in 2009, and 76.1 percent in 2010. The methodology used by Manatee Memorial to calculate those figures was as follows: first, the 2008-2010 populations were projected by using the 2003 BEBR estimate as a starting- point and then applying the city’s building permit-based methodology described in Part D(2) above; then a use rate of 142 was applied to the 2008-2010 populations to calculate the discharges from the PSA; then, after applying the market share assumptions, a 20 percent factor was added to reflect “in- migration” from the SSA; and, finally, the discharges were converted to patient days by applying an ALOS of 4.2. The results of this methodology are not reasonable. As discussed in Part D(2), the city’s methodology for projecting future population is not reliable and tends to overstate the future population. Moreover, the use rate is overstated because it is not age-cohort specific and it did not take into account the declining age of the city’s population. The combined effect of applying an overstated use rate to the overstated 2008-2010 populations is a significant overstatement in the projected patient days and utilization rates at North Port Hospital. The most reasonable projections of the discharges from the PSA for 2008-2010 are those in Exhibit EF-10 (pages XI- 1, XII-1, and XII-2): 5,433 in 2008; 5,709 in 2009; and 6,000 in 2010. Those projections are based upon the updated Claritas population projections and a declining use rate. Applying the market share assumptions and ALOS used in the methodology in Manatee Memorial’s CON application to those more reasonable discharge projections results in projected patient days at North Port Hospital of 12,835 in 2008; 17,983 in 2009; and 22,050 in 2010.5 If an ALOS of 4.5 were used (rather than the 4.2 ALOS used in Manatee Memorial’s CON application), the projected patient days would be 13,752 in 2008; 19,268 in 2009; and 23,625 in 2010.6 The utilization rate at North Port Hospital based upon those patient-day projections will be between 29.3 and 31.4 percent in 2008, between 41.1 and 44 percent in 2009, and between 50.3 and 53.9 percent in 2010. Statutory and Rule Criteria There was no credible evidence that there is a need for two new acute care hospitals in the city of North Port or in southern Sarasota County. Therefore, if either of the CON applications at issue in this proceeding is to be approved, it should be the one that best satisfies the applicable statutory and rule criteria. (1) § 408.035(1), (2), and (5), Fla. Stat. (2005),7 and Fla. Admin. Code R. 59C-1.008(2)(e)2. (a) Generally Subsections 408.035(1), (2), and (5), Florida Statutes, are interrelated and require an evaluation of the availability and accessibility of the existing hospitals in the district and the extent to which the proposed new hospital would “enhance access” for residents of the district. Florida Administrative Code Rule 59C-1.008(2)(e)2. also requires consideration of those issues, as well as population demographics and dynamics and market conditions. Florida Administrative Code Rule 59C-1.008(2)(e)2. is implicated when the Agency does not have a rule methodology or policy for calculating need, which is now the case for acute care beds. The utilization levels at the existing hospitals is a measure of their availability, but the Agency does not focus on utilization levels to the same extent that it did before the recent “deregulation” of acute care bed additions at existing hospitals. North Port Population Growth and Demographics There has been steady population growth in the city of North Port since 2000, and that the growth is projected to continue over the applicable planning horizon. The city's population grew by 56.7 percent between 2000 and 2004, and it is projected to grow by an additional 39.3 percent between 2004 and 2010. These percentage growth rates are misleading, however, because of the city’s small size.8 The actual population figures are a better measure of the city’s projected growth for CON purposes. Those figures reflect an increase of only an additional 14,000 persons between 2004 and 2010, which is a modest amount of growth. In 2010, the city’s population is still projected to be less than 50,000. The percentage of the city’s population in the 65+ age cohort is declining, as is the median age of the city’s population. These declines are significant because the elderly generally utilize hospital services at a higher rate than younger persons. The projected population growth in the city of North Port through 2010 is not in and of itself a basis for approving a new hospital in the city, and the declining elderly population and median age in the city also weigh against the approval of a hospital in the city. Quality of Care and Utilization at the Existing Hospitals and Market Conditions Manatee Memorial and HMA do not contend that there are problems with the quality of care at the existing hospitals currently serving the city of North Port, and the evidence establishes that the existing hospitals, which are all JCAHO- accredited, provide high quality care. There is not a shortage of acute care beds in the existing hospitals serving the city of North Port, and the evidence establishes that there are more than enough available beds at the existing hospitals, even during the “season.” The capacity constraints experienced at several of the hospitals during the 2004-2005 “season” are attributable to the impacts of Hurricane Charley, which resulted in the loss of 78 beds (including a 10-bed ICU) at Fawcett and also caused strains on the other hospitals. Even though the utilization rates at the existing hospitals are not as significant now as they once were, it is still noteworthy that none of the hospitals in Charlotte and Sarasota Counties had a occupancy rate above 57 percent in 2004 and that the number of patient days in those hospitals decreased by approximately 20,000 between 2002 and 2004. Availability and Accessibility of the Existing Hospitals and Enhancing Access The accessibility of the existing hospitals in an area is typically evaluated in terms of geographic, programmatic, cultural, and financial access. Geographic access concerns arise when there are substantial impediments to patients obtaining services at the existing hospitals in a timely manner, and typically involve distance, travel time, geographic barriers, or other similar factors. Programmatic access concerns arise when specific programs or services are not available at the existing hospitals or when the quality of the existing programs or services is inadequate. Cultural access concerns arise when cultural factors, such as race, ethnicity, and/or national original, impede patients from obtaining services at the existing hospitals. Financial access concerns arise when indigent patients are denied or have difficulty in obtaining care because of policies or practices in place at the existing hospitals. Manatee Memorial and HMA did not contend in their CON applications, nor is the evidence persuasive that a hospital in North Port is needed to address programmatic, cultural, or financial access concerns. Manatee Memorial and HMA contend that a hospital is needed in North Port to address existing geographic access problems and/or to enhance geographic access to acute care and emergency services for North Port residents. Geographic Access, Generally There are no significant geographic barriers between North Port and the existing hospitals, although it is necessary to cross a drawbridge over the Intracoastal Waterway to get to Venice Hospital. There are five acute care hospitals within 20 miles of North Port. Two of the hospitals, Peace River and Fawcett, are less than five miles south of the city’s southern border. As discussed in Part D(3) above, there is significant "out-migration" of patients from North Port in Subdistrict 8-6 to hospitals outside of the subdistrict. "Out-migration" of patients from one subdistrict to hospitals in another subdistrict can be an indication of an access problem. The proximity of North Port to Peace River and Fawcett explains the significant level of “out-migration” of patients from the city to those hospitals in Subdistrict 8-1. Indeed, in 2004, approximately 72.2 percent of the North Port patients who were discharged from a hospital outside of Subdistrict 8-6 were discharged from either BS-St. Joe (now Peace River) or Fawcett.9 Thus, the significant level of “out- migration” of patients from the city to hospitals outside of Subdistrict 8-6 does not, in and of itself, indicate an access problem. The CON applications indicate that there are as many as six hospitals within a 30-minute drive of North Port, and that four are within a 17-minute drive. Those drive times were corroborated by several of the witnesses who testified at the hearing. A 30-minute drive time is the generally accepted standard for access to acute care services. There was anecdotal testimony that the drive times can be significantly longer if there is an accident on US 41 or I-75, but the more persuasive evidence was that the “typical” drive times are those reflected in the CON applications. The evidence was not persuasive that the current drive times will be longer in the future even though the city’s population is expected to increase. Indeed, although there was testimony that the city is considering a moratorium on development due, in part, to the congestion on the city’s roads, there was also testimony that there are planned or ongoing capital improvements to expand the capacity of the roads. A hospital in North Port is not necessary to address a geographic access problem. As recognized by Mr. Nelson in his report to the city regarding the need for a hospital in North Port, “[t]he proximity of two hospitals within 10 miles negates a geographic access argument.” It cannot be determined whether, or to what extent, a hospital in North Port will enhance geographic access because it is unknown where the hospital will be located. Indeed, it is possible that because of the city’s large landmass some North Port residents will be as close to one or more of the existing hospitals even if there is a hospital within the city limits. Access to Emergency Care Another “access” argument advanced by Manatee Memorial and HMA focuses on perceived problems with access to emergency care in the existing hospitals. One measure of access to emergency care is the length of time that patients stay in the ED from the time of their arrival to the time of their discharge (hereafter “ED-LOS”). A related measure of access to emergency care is the number of patients who leave the ED without treatment or against medical advice (collectively “LWOTs”). A longer ED-LOS does not directly correlate to a “delay” in access to emergency care because the ED-LOS includes not only the time that the patient is waiting to be seen, but also the time that the patient is being assessed and treated, which can vary based upon the complexity or severity of the patient’s medical condition. A two to three-hour ED-LOS is a reasonable standard. HMA has established a two-hour “goal” for ED-LOS at its hospitals. Charlotte Regional, Peace River, and Venice Hospital have been unable to meet the two-hour goal. ED-LOS fluctuates throughout the year. It is higher between December and April, which generally corresponds to the “season” in Sarasota and Charlotte Counties. The number of LWOTs also fluctuates throughout the year and, like ED-LOS, LWOTs are typically higher during the “season.” This indicates that, as would be expected, there is a correlation between longer ED-LOS and LWOTs. The ED-LOS at Charlotte Regional has increased over the past several years. For example, its average annual ED-LOS increased from two hours and 46 minutes in 2003 to three hours and 16 minutes in 2005 (through March), and its average ED-LOS in March 2005 was three hours and 45 minutes. The ED-LOS at Venice Hospital has also increased over the past several years. In 2003, its average annual ED-LOS was 2.94 hours and, in 2005 (through March), its average ED-LOS was 3.55 hours. The average ED-LOS in February 2005 was 4.18 hours. The record does not reflect the average ED-LOS at Peace River, although there was anecdotal testimony that the ED- LOS can be as long as six to eight hours during the “season.” The number of LWOTs at Charlotte Regional has been increasing over the past several years, as has the number of LWOTs at Venice Hospital. LWOTs have also been a problem at Peace River. The ED-LOS at Fawcett was approaching two hours prior to Hurricane Charley, but it has increased since the hurricane. The anecdotal testimony that the ED-LOS at Fawcett is “routinely” six-to-eight hours during the “season” was not persuasive. The ED-LOS at Englewood is two-to-three hours. Charlotte Regional’s ED has 12 beds and had approximately 19,000 visits in 2004. The ED has long been in need of expansion and/or renovation, but there are no current plans to expand the ED. Expansion of the ED would be difficult because of the age of the hospital, its location in a floodplain, and limited space on the current site. Peace River’s ED was expanded in December 2003 to include 24-beds and a 10-bed observation unit. Its patient volume has grown from 16,000 visits in 1990 to 32,000 visits in 2004, and despite the expansion, Peace River’s ED continues to be overburdened during the “season.” Fawcett’s ED is 5,700 SF and has 13 treatment “rooms,” some of which are separated by curtains. The ED has not been expanded since 1992 despite increasing volumes. In 2004, Fawcett’s ED had 21,000 visits. In April 2005, Fawcett received approval from HCA for a $7.3 million expansion to its ED. The expansion will increase the size of the ED to 12,500 SF and 20 treatment rooms. Architectural plans for the expansion had not been prepared at the time of the final hearing, but it was expected that construction on the expansion would begin by the end of 2005 and be completed by December 2006. The expansion of Fawcett's ED will help to enhance access to emergency care at Fawcett. Englewood’s ED has eight beds and two “fast track” beds. It had approximately 17,000 visits in 2004. Englewood’s ED is approximately the same size as Fawcett’s ED, but with fewer beds. There are no plans to expand the ED at Englewood because, as noted above, ED-LOS has not been a problem at Englewood. Another measure of access to emergency care is the frequency that the existing hospitals are on “diversion.” A hospital goes on diversion when it is unable to receive any additional emergency patients and the EMS providers are instructed to take additional patients to another hospital. There are a number of reasons that a hospital may go on diversion. Common reasons include an overcrowded ED, a lack of ICU beds or inpatient beds to move ED patients into, or a piece of equipment (such as a CT scanner) being unavailable. A hospital may be on “full” diversion status, meaning that it is unable to accept any patients, or it may be on diversion status for only certain types of patients, such as OB patients or patients in need of CT scans. Diversion has not been a significant problem in Charlotte County, but it is becoming more common for one or more of the hospitals in the county -– Charlotte Regional, Peace River, and Fawcett -– to be on diversion, particularly during the “season.” When one of the hospitals goes on diversion, there is often a “domino” effect at the other hospitals resulting in all three of the hospitals being on diversion at the same time. When all of the hospitals are on diversion at the same time, EMS requires each hospital to take patients on a rotational basis. The most common reason that Charlotte Regional goes on diversion is a lack of inpatient beds to receive patients admitted through the ED, which results in a “bottleneck” of patients in the ED. The length of time that Charlotte Regional remains on diversion typically ranges from two to 12 hours. The most common reason that Fawcett goes on diversion is a lack of inpatient beds to move patients into from the ED. This problem was exacerbated by the damage to the hospital caused by Hurricane Charley and, as a result, Fawcett has been on diversion considerably more since the hurricane than it was prior to the hurricane. For example, in February 2005, Fawcett was on diversion for a total of 260 hours, as compared to 13 hours in February 2004 and 62 hours in February 2003. Fawcett also has gone on diversion when its CT scanner is unavailable. Fawcett recently received approval from HCA to add a second CT scanner, which should alleviate the need to go on diversion based upon the unavailability of its CT scanner. The expansion of Fawcett's ED will help to reduce Fawcett's need to go on diversion, as will the completion of the repair work to the fourth floor of the hospital. Englewood rarely has to go on diversion. In 2005, it was only on diversion three times and, in 2004, it was only on diversion twice. The primary reason that Englewood goes on diversion is when its CT scanner is unavailable. Emergency patients from North Port do not significantly contribute to the ED overcrowding issues faced by the Charlotte County hospitals. The only persuasive evidence regarding the number of emergency patients from North Port who utilized the EDs at the existing hospitals was the transport data compiled by North Port EMS. That data reflects that between March 1, 2004, and March 1, 2005, 706 patients were transported by North Port EMS to BS-St. Joe/Peace River and 701 patients were transported by North Port EMS to Fawcett, which is less than two patients per day to each hospital and only a small fraction of the total ED visits at Peace River (32,000 in 2004) and Fawcett (21,000 in 2004). On average, a North Port EMS ambulance is “out of service” for 86 minutes when it is transporting a patient to an area hospital. That time starts when the ambulance is dispatched on a call and ends when the ambulance returns to the city. The average “out of service” times for transports to Peace River and Fawcett (which are the two closest hospitals to the city) are 67 minutes and 82 minutes, respectively. The only variable portion of the “out of service” time is the time that the ambulance is in transit from the location where the patient is picked up to the hospital and the time that it is in transit from the hospital back to the city. The remainder of the “out of service” time is fixed in the sense that it will occur no matter where the patient is ultimately transported. As reflected in Exhibit HMA-14 (page 14-22), the fixed portion of the out of service time can be 31 to 36 minutes, and includes the time between dispatch and arrival at the patient’s location, the time that it takes the paramedics to deliver the patient to the hospital’s nursing staff and exchange report information, and the time that it takes the paramedics to clean and restock the ambulance. The North Port EMS system is strained when one of its ambulances is out of service because the city only has three ambulances. North Port EMS is expected to get another ambulance in 2005. A hospital in North Port may reduce the strain on the North Port EMS system by reducing the variable component of the “out of service” time for its ambulances. However, the evidence was not persuasive as to the extent of the reduction since it is unknown where the hospital would be located in the city. Approval of a hospital in North Port would not eliminate the strain on the North Port EMS. Even if one of the proposed hospitals at issue in this proceeding were approved, trauma patients and patients in need of tertiary services would still need to be transported to another hospital in the area. Even though the EDs at the existing hospitals are heavily utilized and, at times, overcrowded, the evidence was not persuasive that there is a significant access problem for emergency services in the area. The evidence was also not persuasive that the approval of a hospital in North Port would materially enhance access to emergency services. Access to OB Service The evidence was not persuasive that there are access problems for North Port residents with respect to OB services, and, to the contrary, the evidence establishes that OB services are available and reasonably accessible at Peace River and Sarasota Memorial. A hospital in North Port would provide more convenient access to OB services for North Port residents, at least those who are closer to the North Port hospital than they are to Peace River. OB patients would also benefit from having more convenient pre-natal care and other OB/GYN services that are proposed as part of the “women’s center” center at Manatee Memorial’s North Port Hospital. However, it is not necessary to provide many of those services in a hospital setting, and the inclusion of those services does not justify the approval of a hospital in North Port. More convenient or enhanced access to OB services resulting from a hospital in North Port does not, in and of itself, justify the approval of the CON applications. In 2010, there are projected to be only 686 OB discharges from the North Port zip codes, which, based upon the 2004 ALOS of 2.34, will generate 1,606 patient days. If a North Port hospital captured 100 percent of those patients, its OB unit would have an ADC of only five patients in 2010. There is more than enough capacity at the existing hospitals that offer OB services to accommodate those patients, and it is unlikely that a hospital in North Port would get 100 percent of the OB patients from the city because the high-risk patients will likely go to a hospital that has a NICU. Summary In sum, the evidence was not persuasive that there is a “need” for a hospital in North Port due to the projected population growth in the city or that there are significant problems in accessing emergency or other care at the existing hospitals in the area that would be materially enhanced through the approval of a hospital in North Port. As a result, and in light of the relatively low utilization rates at the existing hospitals, the criteria in Subsections 408.035(1), (2), and (5), Florida Statutes, and Florida Administrative Code Rule 59C- 1.008(2)(e)2. strongly weigh against the approval of either CON application. (2) § 408.035(3), Fla. Stat. Subsection 408.035(3), Florida Statutes, requires consideration of the applicants’ ability to, and record of, providing quality of care. Manatee Memorial and HMA each has a history of providing a high quality of care at its existing hospitals, and it is reasonable to expect that each would provide a high quality of care at its proposed North Port hospital. All of the existing hospitals that currently serve North Port are JCAHO-accredited, and it is undisputed that they provide a high quality of care. The evidence was not persuasive that the quality of care provided at either of the proposed North Port hospitals would be materially higher than that provided at the existing hospitals currently serving North Port.10 In some respects, the quality of care provided at the proposed North Port hospitals will be lower than that provided at the existing hospitals. For example, neither hospital will offer interventional cardiology services, which is (or is becoming) the standard of care for treating heart attack patients, and neither hospital will have any NICU beds to provide “back-up” for high-risk deliveries. The evidence was not persuasive that the quality of care provided at North Port HMA will be materially higher than that provided at Manatee Memorial’s North Port Hospital, or vice versa.11 In sum, Manatee Memorial and HMA each satisfies the criteria in Subsection 408.035(3), Florida Statutes, and that statute does not materially weigh in favor of either CON application over the other. (3) § 408.035(4), Fla. Stat. Subsection 408.035(4), Florida Statutes, requires consideration of the availability of staff, funds, and other resources necessary to establish and operate the proposed hospitals. It was undisputed that, with the assistance of their parent companies, Manatee Memorial and HMA have the financial and managerial wherewithal to establish and operate their respective North Port hospitals. Schedule 6 of Manatee Memorial's CON application projects that North Port Hospital will have 252.93 full-time equivalents (FTEs) in its first year of operation and 399.96 FTEs by its third year operation. The number of “nursing” FTEs –- registered nurses (RNs), licensed practical nurses, nursing aides, etc. -- in each of those years are 124.01 and 225.48. Schedule 6 of HMA's CON application projects that North Port HMA will have 307.7 FTEs in its first year of operation and 352 FTEs in its second year operation. The number of “nursing” FTEs in each of those years are 158.8 and 180.07. The staffing projections, including the number of “nursing” FTEs, in each of the CON applications are reasonable. The salary projections in each of the CON applications are reasonable.12 There has been an adequate supply of RNs and other clinical staff in Charlotte and Sarasota Counties despite the nursing shortage in Florida. Although some of the existing hospitals in the area experienced increased vacancy rates after Hurricane Charley, they generally have had relatively low vacancy and turnover rates. For example, the pre-Hurricane Charley vacancy rate at Fawcett was only four percent and, even after the hurricane, the vacancy rate at Englewood was only three percent. Manatee Memorial and HMA will each be able to attract the nurses and other personnel necessary to staff their proposed North Port hospitals at the FTE and salary levels identified in their respective CON applications. The evidence was not persuasive regarding the extent to which a hospital in North Port would draw staff from or otherwise impact the operations of the existing hospitals from a staffing perspective. The testimony offered by Englewood and Fawcett witnesses on these issues was imprecise and largely speculative. With respect to attracting physicians to the proposed North Port hospitals, it is significant that there are a number of specialists and other physicians who already have offices in the city of North Port and who have expressed support for a hospital in the city. It is reasonable to expect that many of those physicians will obtain staff privileges at a North Port hospital and, indeed, several testified that they would do so. HMA is in a better position to attract physicians to its proposed North Port hospital with minimal impact on the existing hospitals than is Manatee Memorial because HMA already employs physicians at the three hospitals it operates in the area from which it can draw medical staff (as Manatee Memorial did from MMH when Lakewood Ranch opened), and HMA also owns the North Port Health Park where a large number of the physician offices in the city are located. In sum, Manatee Memorial and HMA each satisfy the criteria in Subsection 408.035(4), Florida Statutes, and between the two competing applications, the criteria in that subsection marginally weigh in favor of HMA. (4) § 408.035(6), Fla. Stat. Subsection 408.035(6), Florida Statutes, requires consideration of the short-term and long-term financial feasibility of the proposed hospitals. Generally A CON project is financially feasible in the short- term if the applicant has the ability to fund or secure the funding for the capitalized project costs and initial working capital needs of the project in conjunction with the applicant’s other ongoing and planned capital projects. A CON project is financially feasible in the longterm if it will at least break-even in the second year of operation. If the project continues to show a loss in the second year of operation, it is not financially feasible in the longterm unless it is nearing break-even and it is demonstrated that the hospital will break even within a reasonable period of time. HMA It is undisputed that North Port HMA is financially feasible in the shortterm. Schedule 8A of HMA's CON application projects that North Port HMA will have an after-tax net profit of approximately $3.05 million in its second year of operation. The reasonableness of the revenue and cost projections that resulted in that projected net profit was not contested and, as discussed in Part E(1)(b) above, the underlying patient days and utilization are reasonable and attainable. Therefore, North Port HMA is financially feasible in the longterm. Manatee Memorial Manatee Memorial’s North Port Hospital is financially feasible in the shortterm. Even if the construction and other start-up costs for North Port Hospital are materially higher than projected in the CON application (see Part F(6) below), UHS has the financial wherewithal to fund the project. With respect to long-term financial feasibility, Schedule 8A of Manatee Memorial's CON application projects that North Port Hospital will generate a net profit of approximately $3.5 million in its second year of operation (2009), and that by its third year of operation (2010), the hospital will generate a net profit of approximately $12.3 million. It is not unreasonable to look at North Port Hospital’s third year of operation (rather than its second year) in evaluating the hospital’s long-term financial feasibility because, unlike North Port HMA, North Port Hospital is not projected to “mature” until its third year of operation. For example, North Port Hospital is not projected to obtain a 70 percent share of the North Port market until its third year of operation, whereas North Port HMA is projected to have a 70 percent market share by its second year of operation. The projected net profits in Schedule 8A of Manatee Memorial’s CON application are overstated because, as discussed below, the underlying revenues have been overstated and the underlying expenses have been understated in several material respects. First, the revenues are based upon unreasonable and overstated utilization projections. The 2010 ADC at Manatee Memorial’s North Port Hospital will likely be no more than 64.7 patients (see Part E(2)(b) above), rather than the ADC of 76.1 projected in the CON application. The financial impact of the overstated utilization is an overstatement of the hospital’s projected 2010 net profit by at least $4.7 million.13 Second, the revenues attributable to the cardiac cath lab are based upon significantly overstated projections of cardiac cath volume. The cardiac cath lab at North Port Hospital is projected to have 10,359 inpatient and outpatient “procedures” in 2010, which, according to an expert in the administration of cardiac cath labs, is an “unheard of” number for a single cardiac cath lab at a non-tertiary hospital. The projections of cardiac cath procedures are based upon the experience at MMH. For example, the ratio of inpatient to outpatient procedures at MMH is 2.43, which is the same ratio projected for North Port Hospital. It is not reasonable to base the projected volume of cardiac caths and/or cardiac cath “procedures” at North Port Hospital on the experience at MMH because MMH has an OHS program and hospitals with OHS programs perform considerably more cardiac caths than hospitals without OHS programs. In 2004, for example, the District 8 hospitals without OHS programs averaged only 190 cardiac caths, as compared to an average of 1,476 cardiac caths for hospitals with OHS programs. Manatee Memorial acknowledges in its PRO that the projected cath procedures in the CON application are “on the high side,” but it contends that it is “not materially out of line” with the lab’s capacity because MMH did 24,629 inpatient and outpatient procedures in its two cardiac cath labs in 2003. In 2003, MMH did 17,467 inpatient "procedures" and had 1,387 cardiac cath cases, which is a ratio of 12.6 procedures per case. Manatee Memorial’s North Port hospital will likely have a ratio closer to 4.5 procedures per case, which is the ratio at Englewood and Fawcett and, as reflected in Exhibit HMA-59, is more in-line with the experience at the other hospitals in the area that do not offer OHS. The most reasonable projection of the number of cardiac cath procedures at North Port Hospital is contained in Exhibit EF-12 (at pages 6-7) which projects that the hospital will have a total of 1,473 inpatient and outpatient cardiac cath “procedures” in 2010. Indeed, that projection is likely slightly overstated because it is based upon the overstated population projections in Manatee Memorial’s CON application. The financial impact of the overstatement of cardiac cath procedures is an overstatement of the 2010 net income at North Port Hospital by approximately $5.5 million. Third, the revenues attributable to the OB unit are based upon overstated projections of OB patient days. The application projects that Manatee Memorial’s North Port hospital will have 3,770 OB patient days in 2010, which equates to 1,573 births. The record does not reflect how those figures were calculated. The health planner who prepared Manatee Memorial’s CON application testified that she did not project the number births and/or OB patient days that would likely be generated by North Port residents between 2008-10. The most reasonable projections of the number of births and OB patient days generated by North Port residents in 2010 are those referenced in Part D(3) above, which were derived from the data in Exhibit EF-10, at pages XV-1 through XV-3. The overstatement of OB patient days in Manatee Memorial’s CON application results in an overstatement of OB “charges” by approximately $1.81 million.14 The record does not reflect the degree to which net profit is overstated as a result of the overstatement in OB charges because the OB costs referenced in Manatee Memorial’s CON application are not projected on a patient-day basis. Finally, depreciation expenses are understated due to the significant understatement of the total project cost for North Port Hospital discussed in Part F(6) below. The understatement of the total project cost directly impacts North Port Hospital’s net profit by understating the depreciation expense by approximately $3.9 million per year. North Port Hospital will more likely than not generate a net loss in its third year of operation as a result of the overstated revenue projections and understated depreciation expense. Therefore, North Port Hospital is not financially feasible in the longterm. Summary In sum, the criteria in Subsection 408.035(6), Florida Statutes, weighs in favor of HMA because its proposed North Port hospital is financially feasible. (5) § 408.035(7), Fla. Stat. Subsection 408.035(7), Florida Statutes, requires consideration of “[t]he extent to which the proposal will foster competition that promotes quality and cost effectiveness.” The market for acute care services in Sarasota and Charlotte Counties is competitive, as is the North Port market. There are multiple hospitals (and hospital companies) serving the area, none of which has a dominant share of the market. The 2004 market shares of the acute care discharges from the North Port zip codes were as follows: BS-St. Joe (26.9 percent); Fawcett (20.19 percent); Sarasota Memorial (14.7 percent); BS-Venice Venice (13.78 percent); Charlotte Regional (6.94 percent); Englewood (5.9 percent); Doctors Hospital (2.39 percent); all other providers (9.19 percent). Thus, in 2004, the Bon Secours hospitals had a 40.68 percent market share, HMA had a 6.94 percent market share, HCA had a 28.48 percent market share, and Sarasota Memorial had a 14.7 percent market share. The hospitals’ respective market shares were similar in 2002 and 2003, which reflects a relatively stable market for acute care services. HMA now has the largest market share of the North Port market (approximately 47.6 percent) as a result of its acquisition of the Bon Secours hospitals in February 2005. The stated purpose of HMA’s acquisition of the Bon Secours hospitals was to create a “strategic southwest Florida network encompassing Collier County, Lee County, Charlotte County, and Sarasota County.” According to HMA, “these strategic networks will provide patients and communities with an improved continuity of care and access to even more quality health care close to home.” The evidence was not persuasive that the addition of North Port HMA to this “strategic network” will give HMA inordinate leverage with physicians or payors, although the possibility will exist. The approval of North Port HMA will increase HMA’s share of the North Port "market" from 47.6 percent to 82.7 percent. It will also increase HMA’s share of the Sarasota County "market" (from 21.4 to 29.1 percent) and HMA's share of the Sarasota County/Charlotte County "market" (from 33.7 to 39 percent). The evidence was not persuasive that the approval of North Port HMA would be anti-competitive even though it would result in HMA becoming a dominant provider in North Port. Indeed, there will still be healthy competition for acute care services in the broader Sarasota County or Sarasota County/Charlotte County "markets". Nevertheless, the approval of North Port HMA will certainly not “foster” competition. The approval of North Port Hospital would add a new competitor to the market and, to that end, it would “foster” competition. However, the evidence was not persuasive as to how or to what extent the competition fostered by Manatee Memorial’s entry into the market would promote cost effectiveness. In sum, the criteria in Subsection 408.035(7), Florida Statutes, marginally favors Manatee Memorial over HMA, but this criteria is not given significant weight because of the significant competition that currently exists in North Port and the surrounding areas and that will continue to exist in Sarasota and Charlotte Counties even if a hospital is approved in North Port. (6) § 408.035(8), Fla. Stat. Subsection 408.035(8), Florida Statutes, requires consideration of the costs and methods of the proposed construction, including the availability of alternative, less costly, or more effective methods of construction. It was stipulated that the site development costs contained in the CON applications are reasonable and appropriate even though neither of the applicants has identified a site for its proposed North Port hospital. It was undisputed that the construction costs ($39.8 million or $221 per SF) and the total project costs ($78 million) for North Port HMA are reasonable. The reasonableness of the construction costs and the total project costs for North Port Hospital is in dispute. Schedule 1 of Manatee Memorial’s CON application reflects that the construction costs for North Port Hospital will be $32.9 million, which equates to $165 per SF. The $165/SF construction cost includes “bricks and mortar only.” Manatee Memorial’s architect unequivocally testified that the cost does not include any equipment costs. The $165/SF construction cost is not reasonable, and as described by one construction cost expert, it is “way off the Richter scale.” The $165/SF construction cost would be even more unreasonable if, as suggested by several Manatee Memorial witnesses, that figure includes fixed equipment costs, notwithstanding the unequivocal testimony of Manatee Memorial’s architect that the $165/SF construction cost does not include such costs. The $165/SF cost is only slightly higher than the construction cost of Lakewood Ranch, as reflected on the Final Project Cost Report (Cost Report) for that hospital, even though Lakewood Ranch was completed in 2004 and the construction of North Port Hospital will not begin until 2008. The Cost Report reflects that the actual construction costs for Lakewood Ranch were $33,111,591 and that the facility had 185,000 SF. The Cost Report indicates that that the $33 million figure includes fixed equipment costs, but it does not itemize those costs. The fixed equipment costs were estimated in the Lakewood CON application at $4 million, and using that figure, the “bricks and mortar” construction costs at Lakewood Ranch were approximately $157/SF.15 Inflating the $157/SF cost of Lakewood Ranch to 2008 would result in construction costs of approximately $180/SF. A construction cost of $180/SF is more reasonable than the $165/SF estimate in Manatee Memorial’s CON application, but it is still lower than would be expected for a hurricane-hardened hospital in southwest Florida. A more reasonable construction cost for North Port Hospital is between $200/SF and North Port HMA’s $221/SF. Thus, North Port Hospital’s construction costs are understated by $7.1 million to $11 million. Schedule 1 of Manatee Memorial’s CON application estimates $12 million of equipment costs for North Port Hospital. That cost includes fixed and movable equipment costs. The $12 million figure does not include all of the IT systems and other “state-of-the-art” equipment identified in Manatee Memorial’s CON application. Manatee Memorial’s equipment expert testified that the total budget for the IT equipment alone will be $10 million to $14 million. The $12 million figure only includes the cost of the equipment necessary for the hospital’s first year of operation because UHS typically does not fully equip its hospitals before they open. Manatee Memorial followed a similar approach -– i.e., incrementally equipping the hospital as census increased -– at Lakewood Ranch. The reasonableness of that approach is not specifically addressed in the Lakewood Ranch Recommended or Final Orders. This approach has the effect of understating the total cost of the project by including only a portion of the equipment costs that will be necessary to fully equip the hospital. A more reasonable estimate of the equipment costs for North Port Hospital is between $23 million to $29 million, which includes the costs of movable equipment, the IT systems, and the other “state of the art” equipment described in Manatee Memorial’s CON application. Thus, Manatee Memorial’s equipment costs are understated by as much as $17 million. Schedule 1 of Manatee Memorial’s CON application projects pre-opening expenses of $250,000. Lakewood Ranch had pre-opening expenses of approximately $3.2 million. It is reasonable to expect similar pre-opening expenses at North Port Hospital since it was modeled after Lakewood Ranch. When Lakewood Ranch's pre-opening expenses adjusted for inflation, the pre-opening expenses at North Port Hospital will likely be $3.5 million. As a result, the pre-opening expenses for North Port Hospital have been understated by approximately $3.25 million. In sum, the total cost of Manatee Memorial’s proposed North Port hospital is understated by as much as $32 million. Each of the proposed hospitals has certain design features that are better than the other hospital. For example, North Port HMA has a full complement of private rooms and shorter hallways, whereas North Port Hospital has a better separation of its various patient entrances. The evidence was not persuasive that either hospital is materially superior to the other from a design perspective.16 In sum, the criteria in Subsection 408.035(8), Florida Statutes, weighs in favor of HMA because its project costs are more reasonable than those projected by Manatee Memorial. (7)_ § 408.035(9), Fla. Stat. and Fla. Admin. Code R. 59C-1.030(2) Subsection 408.035(9), Florida Statutes, requires consideration of the applicants’ past and proposed commitment to Medicaid patients and the medically indigent. Similarly, Florida Administrative Code Rule 59C- 1.030(2) requires consideration of the impact of the proposed projects on the ability of low-income persons and other medically underserved groups to access care. The statutory reference to “the medically indigent” encompasses what are typically referred to as charity patients. HMA, Inc., and Manatee Memorial each provide a significant level of care to Medicaid and charity patients at their existing hospitals. HMA, Inc., provided approximately $101 million in uncompensated charity care at its Florida hospitals for the 12- month period ending September 30, 2004, which is approximately four percent of its gross patient revenues. For that same period, approximately 7.6 of the gross patient revenues at those hospitals were attributable to Medicaid patients. Manatee Memorial provides more than 90 percent of the charity care in Manatee County, which is not surprising since MMH is the largest and one of the oldest hospitals in the county. In 2004, Manatee Memorial provided approximately $16.6 million in charity care, which is approximately three percent of its gross charges. That figure was offset by a $2.8 million subsidy that Manatee Memorial received from Manatee County for indigent care. Neither HMA nor Manatee Memorial conditioned the approval of its CON application on the provision of a particular level of care to Medicaid or charity patients. HMA offered to condition the approval of its application on a commitment to “accept all Medicaid and indigent patients that are clinically appropriate for services offered by [North Port HMA].” Similarly, Manatee Memorial offered to condition the approval of its application on a commitment that “[a]ll Medicaid & indigent patients will be accepted as are clinically appropriate for services.” The Agency reasonably construed those proposed conditions to be offering nothing more than the law currently requires. Moreover, it is unclear how the proposed conditions could be monitored by the Agency. The Agency did not accept the condition proposed by HMA. Instead, in the SAAR, it conditioned the approval of HMA’s application on the provision of 6.9 percent of the patient days at North Port HMA to Medicaid patients and 2.9 percent of the patient days to charity patients. Those figures were derived from Schedule 7A of HMA’s CON application and the notes thereto. HMA did not challenge those conditions and, therefore, is bound by them if its CON application is ultimately approved notwithstanding the recommendation herein. Mr. Gregg testified that if Manatee Memorial’s application is ultimately approved, the approval should include conditions similar to those imposed in the SAAR on the approval of HMA’s application. The revenues projected in Schedule 7A of Manatee Memorial’s CON application were calculated based upon the assumption that 7.25 percent of the patient days at North Port Hospital will be attributable to Medicaid patients. The percentage of patient days at North Port Hosptial attributable to charity care is not specified on Schedule 7A or the notes thereto,17 but it appears that the percentage is approximately 2.6 percent.18 Thus, if contrary to the recommendations herein, the Agency ultimately approves Manatee Memorial’s CON application, it should condition the approval North Port Hospital providing 7.25 percent of its patient days to Medicaid patients and 2.6 percent of its patient days to charity patients. A new hospital in North Port is not necessary to address any financial access problems in the area. There was no persuasive evidence that there is an access problem for Medicaid, charity, or other traditionally medically underserved patients at the existing hospitals in south Sarasota County and north Charlotte County. To the contrary, the evidence reflects that all of the existing hospitals in the area provide access to patients without regard to their ability to pay. As a result, the criteria in Subsection 408.035(9), Florida Statutes, is given minimal weight in determining whether a hospital is needed in North Port. The criteria in Subsection 408.035(9), Florida Statutes, do not materially weigh in favor either CON application over the other. Each applicant has a history of providing Medicaid and charity care and each has proposed to provide approximately 9.8 percent of its patient days to Medicaid and charity patients combined. (8) § 408.035(10), Fla. Stat. Subsection 408.035(10), Florida Statutes, which requires consideration of the applicant’s designation as a Gold Seal Program nursing facility, is not applicable because HMA and Manatee Memorial are not proposing to add nursing home beds. Impact of the Proposed North Port Hospitals on the Existing Hospitals in the Area North Port is in the PSA of both Fawcett and Englewood, if, as is common, the PSA is defined as the zip codes from which the hospital receives 75 percent of its admissions. In 2004, approximately 12 percent of Fawcett’s non- tertiary patients came from the North Port zip codes, and approximately 6.6 percent of Englewood’s non-tertiary patients came from the North Port zip codes. The approval of either of the proposed North Port hospitals will have an adverse impact on Englewood and Fawcett because they will lose patients to the new hospital. The impact on Englewood and Fawcett will be materially the same, no matter which application is approved because, as discussed above, Manatee Memorial is unlikely to achieve its more aggressive utilization projections. If Manatee Memorial somehow achieved its utilization projections, its North Port Hospital would have a significantly greater impact on the existing providers than would North Port HMA. The existing providers’ shares of the North Port market have remained relatively stable since at least 2002 and, therefore, it is reasonable to expect that they would have similar market shares in the future absent a significant change of circumstances, such as the approval of a new hospital in the area. As a result, it is reasonable to use the current market shares when assessing the impact of the proposed North Port hospitals on the existing providers. The approval of North Port HMA will result in a loss of 227 patients (1,046 patient days) at Englewood and a loss of 772 patients (3,553 patient days) at Fawcett in 2008, which will be the North Port hospital’s second year of operation. The financial impact of that lost patient volume is approximately $807,000 at Englewood and $3.1 million at Fawcett. The approval of North Port Hospital will result in a loss of 259 patients (1,191 patient days) at Englewood and 883 patients (4,064 patient days) at Fawcett in 2010, which will be the North Port hospital’s third year of operation.19 The financial impact of that lost patient volume is approximately $917,000 at Englewood and $4 million at Fawcett.20 Those figures only take into account the patients in the North Port zip codes that Englewood and Fawcett will “lose” to the new North Port hospital. They do not take into account additional patients that Englewood and Fawcett are likely to “gain” through growth in the population in the other zip codes in their service areas. The population growth in Englewood and Fawcett’s service area will largely off-set the patient volume that the hospitals would lose from the North Port zip codes. For example, if North Port HMA is approved, Englewood is projected to have only 16 fewer patients in 2008 than it did in 2004, and Fawcett will have only 28 fewer patients in 2008 than it had in 2004. Fawcett is a profitable hospital. Its earnings before depreciation, interest, taxes, and amortization (EBDITA) was approximately $14 million in 2004, and its operating income was $7.7 million in 2002, $5.1 million in 2003, and $1.7 million in 2004. The lower operating income in 2004 was due to the impacts of Hurricane Charley. Englewood is a less profitable hospital than Fawcett. It had operating losses of $1.7 million in 2002, $2.8 million in 2003, and $1.3 million in 2004. Its highest net income before taxes in any of those years was $631,000 in 2004. However, Englewood’s EBDITA (which is the financial indicator that its chief financial officer “really concentrate[s] on”) was approximately $3.6 million in 2004 and was budgeted to be “a little over 3 million” in 2005. The financial impact of the lost patient volume from the North Port zip codes on Englewood and Fawcett is not significant when compared to the EBDITA at those hospitals. The financial impact is even less significant when the population growth in the other zip codes in Englewood and Fawcett’s service area are taken into account. Indeed, the projected net loss of 28 patients at Fawcett equates to a reduction in net income of only $126,700, and the projected net loss of 16 patients at Englewood equates to a reduction in net income of only $56,624. The approval of a hospital in North Port would also impact Peace River and Venice Hospital. In terms of lost patient volume, the impact on Peace River would be slightly greater than the impact at Fawcett and the impact on Venice Hospital would be slightly less than the impact at Fawcett and slightly more than the impact on Englewood. The record does not reflect the financial impact of that lost patient volume at Peace River or Venice Hospital, which experienced significant operating losses prior to their acquisition and financial turn- around by HMA. In sum, the approval of a hospital in North Port will adversely impact the existing hospitals serving the area, including Englewood and Fawcett. The impacts are significant enough to give Englewood and Fawcett standing in this proceeding, but the impact on Englewood and Fawcett (and the other existing hospitals) is not so significant that it independently warrants denial of the CON applications. Stated another way, the adverse impact on the existing hospitals is a factor weighing against approval of the applications, but that factor is given minimal weight.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Agency issue a final order denying Manatee Memorial’s CON 9767 and also denying HMA’s CON 9768. DONE AND ENTERED this 1st day of December, 2005, in Tallahassee, Leon County, Florida. S T. KENT WETHERELL, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of December, 2005.

Florida Laws (6) 120.569124.01180.07408.035408.0397.25
# 3
MORTON PLANT HOSPITAL ASSOCIATION, INC., D/B/A NORTH BAY HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION AND NEW PORT RICHEY HOSPITAL, INC., D/B/A COMMUNITY HOSPITAL OF NEW PORT RICHEY, 02-003515CON (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Sep. 10, 2002 Number: 02-003515CON Latest Update: May 17, 2004

The Issue Whether the certificate of need (CON) applications filed by New Port Richey Hospital, Inc., d/b/a Community Hospital of New Port Richey (Community Hospital) (CON No. 9539), and Morton Plant Hospital Association, Inc., d/b/a North Bay Hospital (North Bay) (CON No. 9538), each seeking to replace and relocate their respective general acute care hospital, satisfy, on balance, the applicable statutory and rule criteria.

Findings Of Fact The Parties AHCA AHCA is the single state agency responsible for the administration of the CON program in Florida pursuant to Chapter 408, Florida Statutes (2000). The agency separately reviewed and preliminarily approved both applications. Community Hospital Community Hospital is a 300,000 square feet, accredited hospital with 345 licensed acute care beds and 56 licensed adult psychiatric beds, located in southern New Port Richey, Florida, within Sub-District 5-1. Community Hospital is seeking to construct a replacement facility approximately five miles to the southeast within a rapidly developing suburb known as "Trinity." Community Hospital currently provides a wide array of comprehensive inpatient and outpatient services and is the only provider of obstetrical and adult psychiatric services in Sub-District 5-1. It is the largest provider of emergency services in Pasco County with approximately 35,000 visits annually. It is also the largest provider of Medicaid and indigent patient days in Sub-District 5-1. Community Hospital was originally built in 1969 and is an aging facility. Although it has been renovated over time, the hospital is in poor condition. Community Hospital's average daily census is below 50 percent. North Bay North Bay is a 122-bed facility containing 102 licensed acute care beds and 20 licensed comprehensive medical rehabilitation beds, located approximately one mile north of Community Hospital in Sub-District 5-1. It serves a large elderly population and does not provide pediatric or obstetrical care. North Bay is also an aging facility and proposes to construct a replacement facility in the Trinity area. Notably, however, North Bay has spent approximately 12 million dollars over the past three years for physical improvements and is in reasonable physical condition. Helen Ellis Helen Ellis is an accredited hospital with 150 licensed acute care beds and 18 licensed skilled nursing unit beds. It is located in northern Pinellas County, approximately eight miles south of Community Hospital and nine miles south of North Bay. Helen Ellis provides a full array of acute care services including obstetrics and cardiac catheterization. Its daily census average has fluctuated over the years but is approximately 45 percent. Mease Mease operates two acute care hospitals in Pinellas County including Mease Dunedin Hospital, located approximately 18 to 20 miles south of the applicants and Mease Countryside Hospital, located approximately 16 to 18 miles south of Community and North Bay. Each hospital operates 189 licensed beds. The Mease hospitals are located in the adjacent acute care sub-district but compete with the applicants. The Health Planning District AHCA's Health Planning District 5 consists of Pinellas and Pasco Counties. U.S. Highway 41 runs north and south through the District and splits Pasco County into Sub- District 5-1 and Sub-District 5-2. Sub-District 5-1, where Community Hospital and North Bay are located, extends from U.S. 41 west to the Gulf Coast. Sub-District 5-2 extends from U.S. 41 to the eastern edge of Pasco County. Pinellas County is the most densely populated county in Florida and steadily grows at 5.52 percent per year. On the other hand, its neighbor to the north, Pasco County, has been experiencing over 15 percent annual growth in population. The evidence demonstrates that the area known as Trinity, located four to five miles southeast of New Port Richey, is largely responsible for the growth. With its large, single- owner land tracts, Trinity has become the area's fuel for growth, while New Port Richey, the older coastal anchor which houses the applicants' facilities, remains static. In addition to the available land in Trinity, roadway development in the southwest section of Pasco County is further fueling growth. For example, the Suncoast Highway, a major highway, was recently extended north from Hillsborough County through Sub-District 5-1, west of U.S. 41. It intersects with several large east-west thoroughfares including State Road 54, providing easy highway access to the Tampa area. The General Proposals Community Hospital's Proposal Community Hospital's CON application proposes to replace its existing, 401-bed hospital with a 376-bed state- of-the-art facility and relocate it approximately five miles to the southeast in the Trinity area. Community Hospital intends to construct a large medical office adjacent to its new facility and provide all of its current services including obstetrical care. It does not intend to change its primary service area. North Bay's Proposal North Bay's CON application proposes to replace its existing hospital with a 122-bed state-of-the-art facility and also plans to relocate it approximately eight miles to the southeast in the Trinity area of southwestern Pasco County. North Bay intends to provide the same array of services it currently offers its patients and will not provide pediatric and obstetrical care in the proposed facility. The proposed relocation site is adjacent to the Trinity Outpatient Center which is owned by North Bay's parent company, Morton Plant. The Outpatient Center offers a full range of diagnostic imaging services including nuclear medicine, cardiac nuclear stress testing, bone density scanning, CAT scanning, mammography, ultrasound, as well as many others. It also offers general and specialty ambulatory surgical services including urology; ear, nose and throat; ophthalmology; gastroenterology; endoscopy; and pain management. Approximately 14 physician offices are currently located at the Trinity Outpatient Center. The Condition of Community Hospital Facility Community Hospital's core facilities were constructed between 1969 and 1971. Additions to the hospital were made in 1973, 1975, 1976, 1977, 1979, 1981, 1992, and 1999. With an area of approximately 294,000 square feet and 401 licensed beds, or 733 square feet per bed, Community Hospital's gross area-to-bed ratio is approximately half of current hospital planning standards of 1,600 square feet per bed. With the exception of the "E" wing which was completed in 1999, all of the clinical and support departments are undersized. Medical-Surgical Beds And Intensive Care Units Community Hospital's "D" wing, constructed in 1975, is made up of two general medical-surgical unit floors which are grossly undersized. Each floor operates 47 general medical-surgical beds, 24 of which are in three-bed wards and 23 in semi-private rooms. None of the patient rooms in the "D" wing have showers or tubs so the patients bathe in a single facility located at the center of the wing on each floor. Community Hospital's "A" wing, added in 1973, is situated at the west end of the second floor and is also undersized. It too has a combination of semi-private rooms and three-bed wards without showers or tubs. Community Hospital's "F" wing, added in 1979, includes a medical-surgical unit on the second and third floor, each with semi-private and private rooms. The second floor unit is centrally located between a 56-bed adult psychiatric unit and the Surgical Intensive Care Unit (SICU) which creates security and privacy issues. The third floor unit is adjacent to the Medical Intensive Care Unit (MICU) which must be accessed through the medical-surgical unit. Neither intensive care unit (ICU) possesses an isolation area. Although the three-bed wards are generally restricted to in-season use, and not always full, they pose significant privacy, security, safety, and health concerns. They fail to meet minimum space requirements and are a serious health risk. The evidence demonstrates that reconfiguring the wards would be extremely costly and impractical due to code compliance issues. The wards hinder the hospital's acute care utilization, and impair its ability to effectively compete with other hospitals. Surgical Department and Recovery Community Hospital's surgical department is separated into two locations including the main surgical suite on the second floor and the Endoscopy/Pain Management unit located on the first floor of "C" wing. Consequently, the department cannot share support staff and space such as preparation and recovery. The main surgical suite, adjacent recovery room, and central sterile processing are 25 years old. This unit's operating rooms, cystoscopy rooms, storage areas, work- stations, central sterile, and recovery rooms are undersized and antiquated. The 12-bay Recovery Room has no patient toilet and is lacking storage. The soiled utility room is deficient. In addition, the patient bays are extremely narrow and separated by curtains. There is no direct connection to the sterile corridor, and staff must break the sterile field to transport patients from surgery to recovery. Moreover, surgery outpatients must pass through a major public lobby going to and returning from surgery. The Emergency Department Community Hospital's existing emergency department was constructed in 1992 and is the largest provider of hospital emergency services in Pasco County, handling approximately 35,000 visits per year. The hospital is also designated a "Baker Act" receiving facility under Chapter 394, Florida Statutes, and utilizes two secure examination rooms for emergent psychiatric patients. At less than 8,000 total square feet, the emergency department is severely undersized to meet the needs of its patients. The emergency department is currently undergoing renovation which will connect the triage area to the main emergency department. The renovation will not enlarge the entrance, waiting area, storage, nursing station, nor add privacy to the patient care areas in the emergency department. The renovation will not increase the total size of the emergency department, but in fact, the department's total bed availability will decrease by five beds. Similar to other departments, a more meaningful renovation cannot occur within the emergency department without triggering costly building code compliance measures. In addition to its space limitations, the emergency department is awkwardly located. In 1992, the emergency department was relocated to the front of the hospital and is completely separated from the diagnostic imaging department which remained in the original 1971 building. Consequently, emergency patients are routinely transported across the hospital for imaging and CT scans. Issues Relating to Replacement of Community Hospital Although physically possible, renovating and expanding Community Hospital's existing facility is unreasonable. First, it is cost prohibitive. Any significant renovation to the 1971, 1975, 1977, and 1979 structures would require asbestos abatement prior to construction, at an estimated cost of $1,000,000. In addition, as previously noted, the hospital will be saddled with the major expense of complying with all current building code requirements in the 40-year-old facility. Merely installing showers in patient rooms would immediately trigger a host of expensive, albeit necessary, code requirements involving access, wiring, square footage, fireproofing columns and beams, as well as floor/ceiling and roof/ceiling assemblies. Concurrent with the significant demolition and construction costs, the hospital will experience the incalculable expense and loss of revenue related to closing major portions, if not all, of the hospital. Second, renovation and expansion to the existing facility is an unreasonable option due to its physical restrictions. The 12'4" height of the hospital's first floor limits its ability to accommodate HVAC ductwork large enough to meet current ventilation requirements. In addition, there is inadequate space to expand any department within the confines of the existing hospital without cannibalizing adjacent areas, and vertical expansion is not an option. Community Hospital's application includes a lengthy Facility Condition Assessment which factually details the architectural, mechanical, and electrical deficiencies of the hospital's existing physical plant. The assessment is accurate and reasonable. Community Hospital's Proposed Replacement Community Hospital proposes to construct a six- story, 320 licensed beds, acute care replacement facility. The hospital will consist of 548,995 gross square feet and include a 56-bed adult psychiatric unit connected by a hallway to the first floor of the main hospital building. The proposal also includes the construction of an adjacent medical office building to centralize the outpatient offices and staff physicians. The evidence establishes that the deficiencies inherent in Community Hospital's existing hospital will be cured by its replacement hospital. All patients will be provided large private rooms. The emergency department will double in size, and contain private examination rooms. All building code requirements will be met or exceeded. Patients and staff will have separate elevators from the public. In addition, the surgical department will have large operating rooms, and adequate storage. The MICU and SICU will be adjacent to each other on the second floor to avoid unnecessary traffic within the hospital. Surgical patients will be transported to the ICU via a private elevator dedicated to that purpose. Medical-surgical patient rooms will be efficiently located on the third through sixth floors, in "double-T" configuration. Community Hospital's Existing and Proposed Sites Community Hospital is currently located on a 23-acre site inside the southern boundary of New Port Richey. Single- family homes and offices occupy the two-lane residential streets that surround the site on all sides. The hospital buildings are situated on the northern half of the site, with the main parking lot located to the south, in front of the main entrance to the hospital. Marine Parkway cuts through the southern half of the site from the west, and enters the main parking lot. A private medical mall sits immediately to the west of the main parking lot and a one-acre storm-water retention pond sits to the west of the mall. A private medical office building occupies the south end of the main parking lot and a four-acre drainage easement is located in the southwest corner of the site. Community Hospital's administration has actively analyzed its existing site, aging facility, and adjacent areas. It has commissioned studies by civil engineers, health care consultants, and architects. The collective evidence demonstrates that, although on-site relocation is potentially an option, on balance, it is not a reasonable option. Replacing Community Hospital on its existing site is not practical for several reasons. First, the hospital will experience significant disruption and may be required to completely close down for a period of time. Second, the site's southwestern large four-acre parcel is necessary for storm-water retention and is unavailable for expansion. Third, a reliable cost differential is unknown given Community Hospital's inability to successfully negotiate with the city and owners of the adjacent medical office complexes to acquire additional parcels. Fourth, acquiring other adjacent properties is not a viable option since they consist of individually owned residential lots. In addition to the site's physical restrictions, the site is hindered by its location. The hospital is situated in a neighborhood between small streets and a local school. From the north and south, motorists utilize either U.S. 19, a congested corridor that accommodates approximately 50,000 vehicles per day, or Grand and Madison Streets, two-lane streets within a school zone. From the east and west, motorists utilize similar two-lane neighborhood streets including Marine Parkway, which often floods in heavy rains. Community Hospital's proposed site, on the other hand, is a 53-acre tract positioned five miles from its current facility, at the intersection of two major thoroughfares in southwestern Pasco County. The proposed site offers ample space for all facilities, parking, outpatient care, and future expansion. In addition, Community Hospital's proposed site provides reasonable access to all patients within its existing primary service area made up of zip codes 34652, 34653, 34668, 34655, 34690, and 34691. For example, the average drive times from the population centers of each zip code to the existing site of the hospital and the proposed site are as follows: Zip code Difference Existing site Proposed site 34652 3 minutes 14 minutes 11 minutes 34653 8 minutes 11 minutes 3 minutes 34668 15 minutes 21 minutes 6 minutes 34655 11 minutes 4 minutes -7 minutes 34690 11 minutes 13 minutes 2 minutes 34691 11 minutes 17 minutes 6 minutes While the average drive time from the population centroids of zip codes 34653, 34668, 34690, and 34691 to the proposed site slightly increases, it decreases from the Trinity area, where population growth has been most significant in southwestern Pasco County. In addition, a motorist's average drive time from Community Hospital's existing location to its proposed site is only 10 to 11 minutes, and patients utilizing public transportation will be able to access the new hospital via a bus stop located adjacent to the proposed site. The Condition of North Bay Facility North Bay Hospital is also an aging facility. Its original structure and portions of its physical plant are approximately 30 years old. Portions of its major mechanical systems will soon require replacement including its boilers, air handlers, and chillers. In addition, the hospital is undersized and awkwardly configured. Despite its shortcomings, however, North Bay is generally in good condition. The hospital has been consistently renovated and updated over time and is aesthetically pleasing. Moreover, its second and third floors were added in 1986, are in good shape, and structurally capable of vertical expansion. Medical Surgical Beds and ICU Units By-in-large, North Bay is comprised of undersized, semi-private rooms containing toilet and shower facilities. The hospital does not have any three-bed wards. North Bay's first floor houses all ancillary and support services including lab, radiology, pharmacy, surgery, pre-op, post-anesthesia recovery, central sterile processing and supply, kitchen and cafeteria, housekeeping and administration, as well as the mechanical, electrical, and facilities maintenance and engineering. The first floor also contains a 20-bed CMR unit and a 15-bed acute care unit. North Bay's second and third floors are mostly comprised of semi-private rooms and supporting nursing stations. Although the rooms and stations are not ideally sized, they are in relatively good shape. North Bay utilizes a single ICU with ten critical care beds. The ICU rooms and nursing stations are also undersized. A four-bed ICU ward and former nursery are routinely used to serve overflow patients. Surgery Department and Recovery North Bay utilizes a single pre-operative surgical room for all of its surgery patients. The room accommodates up to five patient beds, but has limited space for storage and pre-operative procedures. Its operating rooms are sufficiently sized. While carts and large equipment are routinely stored in hallways throughout the surgical suite, North Bay has converted the former obstetrics recovery room to surgical storage and has made efficient use of other available space. North Bay operates a small six-bed Post Anesthesia Care Unit. Nurses routinely prepare patient medications in the unit which is often crowded with staff and patients. The Emergency Department North Bay has recently expanded its emergency department. The evidence demonstrates that this department is sufficient and meets current and future expected patient volumes. Replacement Issues Relating to North Bay While it is clear that areas of North Bay's physical plant are aging, the facility is in relatively good condition. It is apparent that North Bay must soon replace significant equipment, including cast-iron sewer pipes, plumbing, boilers, and chillers which will cause some interruption to hospital operations. However, North Bay's four-page written assessment of the facility and its argument citing the need for total replacement is, on balance, not persuasive. North Bay's Proposed Replacement North Bay proposes to construct a new, state-of-the- art, hospital approximately eight miles southeast of its existing facility and intends to offer the identical array of services the hospital currently provides. North Bay's Existing and Proposed Sites North Bay's existing hospital is located on an eight-acre site with limited storm-water drainage capacity. Consequently, much of its parking area is covered by deep, porous, gravel instead of asphalt. North Bay's existing site is generally surrounded by residential properties. While the city has committed, in writing, it willingness to assist both applicants with on-site expansion, it is unknown whether North Bay can acquire additional adjacent property. North Bay's proposed site is located at the intersection of Trinity Oaks Boulevard and Mitchell Boulevard, south of Community Hospital's proposed site, and is quite spacious. It contains sufficient land for the facilities, parking, and future growth, and has all necessary infrastructure in place, including utility systems, storm- water structures, and roadways. Currently however, there is no public transportation service available to North Bay's proposed site. Projected Utilization by Applicants The evidence presented at hearing indicates that, statewide, replacement hospitals often increase a provider's acute care bed utilization. For example, Bartow Memorial Hospital, Heart of Florida Regional Medical Center, Lake City Medical Center, Florida Hospital Heartland Medical Center, South Lake Hospital, and Florida Hospital-Fish Memorial each experienced significant increases in utilization following the opening of their new hospital. The applicants in this case each project an increase in utilization following the construction of their new facility. Specifically, Community Hospital's application projects 82,685 total hospital patient days (64,427 acute care patient days) in year one (2006) of the operation of its proposed replacement facility, and 86,201 total hospital patient days (67,648 acute care patient days) in year two (2007). Using projected 2006 and 2007 population estimates, applying 2002 acute care hospital use rates which are below 50 percent, and keeping Community Hospital's acute care market share constant at its 2002 level, it is reasonably estimated that Community Hospital's existing hospital will experience 52,623 acute care patient days in 2006, and 53,451 acute care patient days in 2007. Consequently, Community Hospital's proposed facility must attain 11,804 additional acute care patient days in 2006, and 14,197 more acute care patient days in 2007, in order to achieve its projected acute care utilization. Although Community Hospital lost eight percent of the acute care market in its service area between 1995 and 2002, two-thirds of that loss was due to residents of Sub- District 5-1 acquiring services in another area. While Community Hospital experienced 78,444 acute care patient days in 1995, it projects only 64,427 acute care patient days in year one. Given the new facility and population factors, it is reasonable that the hospital will recapture half of its lost acute care market share and achieve its projections. With respect to its psychiatric unit, Community Hospital projects 16,615 adult psychiatric inpatient days in year one (2006) and 17,069 adult inpatient days in year two (2007) of the proposed replacement hospital. The evidence indicates that these projections are reasonable. Similarly, North Bay's acute care utilization rate has been consistently below 50 percent. Since 1999, the hospital has experienced declining utilization. In its application, North Bay states that it achieved total actual acute care patient days of 21,925 in 2000 and 19,824 in 2001 and the evidence at hearing indicates that North Bay experienced 17,693 total acute care patient days in 2002. North Bay projects 25,909 acute care patient days in the first year of operation of its proposed replacement hospital, and 27,334 acute care patient days in the second year of operation. Despite each applicant's current facility utilization rate, Community Hospital must increase its current acute care patient days by 20 percent to reach its projected utilization, and North Bay must increase its patient days by at least 50 percent. Given the population trends, service mix and existing competition, the evidence demonstrates that it is not possible for both applicants to simultaneously achieve their projections. In fact, it is strongly noted that the applicants' own projections are predicated upon only one applicant being approved and cannot be supported with the approval of two facilities. Local Health Plan Preferences In its local health plan for District 5, the Suncoast Health Council, Inc., adopted acute care preferences in October, 2000. The replacement of an existing hospital is not specifically addressed by any of the preferences. However, certain acute care preferences and specialty care preferences are applicable. The first applicable preference provides that preference "shall be given to an applicant who proposes to locate a new facility in an area that will improve access for Medicaid and indigent patients." It is clear that the majority of Medicaid and indigent patients live closer to the existing hospitals. However, Community Hospital proposes to move 5.5 miles from its current location, whereas North Bay proposes to move eight miles from its current location. While the short distances alone are less than significant, North Bay's proposed location is further removed from New Port Richey, is not located on a major highway or bus-route, and would therefore be less accessible to the medically indigent residents. Community Hospital's proposed site will be accessible using public transportation. Furthermore, Community Hospital has consistently provided excellent service to the medically indigent and its proposal would better serve that population. In 2000, Community Hospital provided 7.4 percent of its total patient days to Medicaid patients and 0.8 percent of its total patient days to charity patients. Community Hospital provided the highest percentage and greatest number of Medicaid patient days in Sub-District 5-1. By comparison, North Bay provided 5.8 percent of its total patient days to Medicaid patients and 0.9 percent of its total patient days to charity patients. In 2002, North Bay's Medicaid patients days declined to 3.56 percent. Finally, given the closeness and available bed space of the existing providers and the increasing population in the Trinity area, access will be improved by Community Hospital's relocation. The second local health plan preference provides that "[i]n cases where an applicant is a corporation with previously awarded certificates of need, preference shall be given to those which follow through in a timely manner to construct and operate the additional facilities or beds and do not use them for later negotiations with other organizations seeking to enter or expand the number of beds they own or control." Both applicants meet this preference. The third local health plan preference recognizes "Certificate of Need applications that provide AHCA with documentation that they provide, or propose to provide, the largest percentage of Medicaid and charity care patient days in relation to other hospitals in the sub-district." Community Hospital provides the largest percentage of Medicaid and charity care patient days in relation to other hospitals in Sub-District 5-1, and therefore meets this preference. The fourth local health plan preference applies to "Certificate of Need applications that demonstrate intent to serve HIV/AIDS infected persons." Both applicants accept and treat HIV/AIDS infected persons, and would continue to do so in their proposed replacement hospitals. The fifth local health plan preference recognizes "Certificate of Need applications that commit to provide a full array of acute care services including medical-surgical, intensive care, pediatric, and obstetrical services within the sub-district for which they are applying." Community Hospital qualifies since it will continue to provide its current services, including obstetrical care and psychiatric care, in its proposed replacement hospital. North Bay discontinued its pediatric and obstetrical programs in 2001, does not intend to provide them in its proposed replacement hospital, and will not provide psychiatric care. Agency Rule Preferences Florida Administrative Code Rule 59C-1.038(6) provides an applicable preference to a facility proposing "new acute care services and capital expenditures" that has "a documented history of providing services to medically indigent patients or a commitment to do so." As the largest Medicaid provider in Sub-District 5-1, Community Hospital meets this preference better than does North Bay. North Bay's history demonstrates a declining rate of service to the medically indigent. Statutory Review Criteria Section 408.035(1), Florida Statutes: The need for the health care facilities and health services being proposed in relation to the applicable district health plan District 5 includes Pasco and Pinellas County. Pasco County is rapidly developing, whereas Pinellas County is the most densely populated county in Florida. Given the population trends, service mix, and utilization rates of the existing providers, on balance, there is a need for a replacement hospital in the Trinity area. Section 408.035(2), Florida Statutes: The availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district of the applicant Community Hospital and North Bay are both located in Sub-District 5-1. Each proposes to relocate to an area of southwestern Pasco County which is experiencing explosive population growth. The other general acute care hospital located in Sub-District 5-1 is Regional Medical Center Bayonet Point, which is located further north, in the Hudson area of western Pasco County. The only other acute care hospitals in Pasco County are East Pasco Medical Center, in Zephyrhills, and Pasco Community Hospital, in Dade City. Those hospitals are located in Sub-District 5-2, east Pasco County, far from the area proposed to be served by either Community Hospital or North Bay. District 5 includes Pinellas County as well as Pasco County. Helen Ellis and Mease are existing hospital providers located in Pinellas County. Helen Ellis has 168 licensed beds, consisting of 150 acute care beds and an 18-bed skilled nursing unit, and is located 7.9 miles from Community Hospital's existing location and 10.8 miles from Community Hospital's proposed location. Access to Helen Ellis for patients originating from southwestern Pasco County requires those patients to travel congested U.S. 19 south to Tarpon Springs. As a result, the average drive time from Community Hospital's existing and proposed site to Helen Ellis is approximately 22 minutes. Helen Ellis is not a reasonable alternative to Community Hospital's proposal. The applicants' proposals are specifically designed for the current and future health care needs of southwestern Pasco County. Given its financial history, it is unknown whether Helen Ellis will be financially capable of providing the necessary care to the residents of southwestern Pasco. Mease Countryside Hospital has 189 licensed acute care beds. It is located 16.0 miles from Community Hospital's existing location and 13.8 miles from Community Hospital's proposed location. The average drive time to Mease Countryside is 32 minutes from Community Hospital's existing site and 24 minutes from its proposed site. In addition, Mease Countryside Hospital has experienced extremely high utilization over the past several years, in excess of 90 percent for calendar years 2000 and 2001. Utilization at Mease Countryside Hospital has remained over 80 percent despite the addition of 45 acute care beds in April 2002. Given the growth and demand, it is unknown whether Mease can accommodate the residents in southwest Pasco County. Mease Dunedin Hospital has 189 licensed beds, consisting of 149 acute care beds, a 30-bed skilled nursing unit, five Level 2 neonatal intensive care beds, and five Level 3 neonatal intensive care beds. Its former 15-bed adult psychiatric unit has been converted into acute care beds. It is transferring its entire obstetrics program at Mease Dunedin Hospital to Mease Countryside Hospital. Mease Dunedin Hospital is located approximately 18 to 20 miles from the applicants' existing and proposed locations with an average drive time of 35-38 minutes. With their remote location, and the exceedingly high utilization at Mease Countryside Hospital, neither of the two Mease hospitals is a viable alternative to the applicants' proposals. In addition, the construction of a replacement hospital would positively impact economic development and further attract medical professionals to Sub-District 5-1. On balance, given the proximity, utilization, service array, and accessibility of the existing providers, including the applicants, the relocation of Community Hospital will enhance access to health care to the residents. Section 408.035(3), Florida Statutes: The ability of the applicant to provide quality of care and the applicant's record of providing quality of care As stipulated, both applicants provide excellent quality of care. However, Community Hospital's proposal will better enhance its ability to provide quality care. Community is currently undersized, non-compliant with today's standards, and located on a site that does not allow for reasonable expansion. Its emergency department is inadequate for patient volume, and the configuration of the first floor leads to inefficiencies in the diagnosis and treatment of emergency patients. Again, most inpatients are placed in semi-private rooms and three-bed wards, with no showers or tubs, little privacy, and an increased risk of infection. The hospital's waiting areas for families of patients are antiquated and undersized, its nursing stations are small and cramped and the operating rooms and storage facilities are undersized. Community Hospital's deficiencies will be effectively eliminated by its proposed replacement hospital. As a result, patients will experience qualitatively better care by the staff who serve them. Conversely, North Bay is in better physical condition and not in need of replacement. It has more reasonable options to expand or relocate its facility on site. Quality of care at North Bay will not be markedly enhanced by the construction of a new hospital. Sections 408.035(4)and(5), Florida Statutes, have been stipulated as not applicable in this case. Section 408.035(6), Florida Statutes: The availability of resources, including health personnel, management personnel, and funds available for capital and operating expenditures, for project accomplishment and operation The parties stipulated that both Community Hospital and North Bay have available health personnel and management personnel for project accomplishment and operation. In addition, the evidence proves that both applicants have sufficient funds for capital and operating expenditures. Community Hospital proposes to rely on its parent company to finance the project. Keith Giger, Vice-President of Finance for HCA, Inc., Community Hospital's parent organization, provided credible deposition testimony that HCA, Inc., will finance 100 percent of the total project cost by an inter-company loan at eight percent interest. Moreover, it is noted that the amount to be financed is actually $20 million less than the $196,849,328 stated in the CON Application, since Community Hospital previously purchased the proposed site in June 2003 with existing funds and does not need to finance the land acquisition. Community Hospital has sufficient working capital for operating expenditures of the proposed replacement hospital. North Bay, on the other hand, proposes to acquire financing from BayCare Obligated Group which includes Morton Plant Hospital Association, Inc.; Mease; and several other hospital entities. Its proposal, while feasible, is less certain since member hospitals must approve the indebtedness, thereby providing Mease with the ability to derail North Bay's proposed bond financing. Section 408.035(7), Florida Statutes: The extent to which the proposed services will enhance access to health care for residents of the service district The evidence proves that either proposal will enhance geographical access to the growing population in the service district. However, with its provision of obstetrical services, Community Hospital is better suited to address the needs of the younger community. With respect to financial access, both proposed relocation sites are slightly farther away from the higher elderly and indigent population centers. Since the evidence demonstrates that it is unreasonable to relocate both facilities away from the down-town area, Community Hospital's proposal, on balance, provides better access to poor patients. First, public transportation will be available to Community Hospital's site. Second, Community Hospital has an excellent record of providing care to the poor and indigent and has accepted the agency's condition to provide ten percent of its total annual patient days to Medicaid recipients To the contrary, North Bay's site will not be accessible by public transportation. In addition, North Bay has a less impressive record of providing care to the poor and indigent. Although AHCA conditioned North Bay's approval upon it providing 9.7 percent of total annual patient days to Medicaid and charity patients, instead of the 9.7 percent of gross annual revenue proposed in its application, North Bay has consistently provided Medicaid and charity patients less than seven percent of its total annual patient days. Section 408.035(8), Florida Statutes: The immediate and long-term financial feasibility of the proposal Immediate financial feasibility refers to the availability of funds to capitalize and operate the proposal. See Memorial Healthcare Group, Ltd. d/b/a Memorial Hospital Jacksonville vs. AHCA et al., Case No. 02-0447 et seq. Community Hospital has acquired reliable financing for the project and has sufficiently demonstrated that its project is immediately financially feasible. North Bay's short-term financial proposal is less secure. As noted, North Bay intends to acquire financing from BayCare Obligated Group. As a member of the group, Mease, the parent company of two hospitals that oppose North Bay's application, must approve the plan. Long-term financial feasibility is the ability of the project to reach a break-even point within a reasonable period of time and at a reasonable achievable point in the future. Big Bend Hospice, Inc. vs. AHCA and Covenant Hospice, Inc., Case No. 02-0455. Although CON pro forma financial schedules typically show profitability within two to three years of operation, it is not a requirement. In fact, in some circumstances, such as the case of a replacement hospital, it may be unrealistic for the proposal to project profitability before the third or fourth year of operation. In this case, Community Hospital's utilization projections, gross and net revenues, and expense figures are reasonable. The evidence reliably demonstrates that its replacement hospital will be profitable by the fourth year of operation. The hospital's financial projections are further supported by credible evidence, including the fact that the hospital experienced financial improvement in 2002 despite its poor physical condition, declining utilization, and lost market share to providers outside of its district. In addition, the development and population trends in the Trinity area support the need for a replacement hospital in the area. Also, Community Hospital has benefited from increases in its Medicaid per diem and renegotiated managed care contracts. North Bay's long-term financial feasibility of its proposal is less certain. In calendar year 2001, North Bay incurred an operating loss of $306,000. In calendar year 2002, it incurred a loss of $1,160,000. In its CON application, however, North Bay projects operating income of $1,538,827 in 2007, yet omitted the ongoing expenses of interest ($1,600,000) and depreciation ($3,000,000) from its existing facility that North Bay intends to continue operating. Since North Bay's proposal does not project beyond year two, it is less certain whether it is financially feasible in the third or fourth year. In addition to the interest and depreciation issues, North Bay's utilization projections are less reasonable than Community Hospital's proposal. While possible, North Bay will have a difficult task achieving its projected 55 percent increase in acute care patient days in its second year of operation given its declining utilization, loss of obstetric/pediatric services and termination of two exclusive managed care contracts. Section 408.035(9), Florida Statutes: The extent to which the proposal will foster competition that promotes quality and cost-effectiveness Both applicants have substantial unused capacity. However, Community Hospital's existing facility is at a distinct competitive disadvantage in the market place. In fact, from 1994 to 1998, Community Hospital's overall market share in its service area declined from 40.3 percent to 35.3 percent. During that same period, Helen Ellis' overall market share in Community Hospital's service area increased from 7.2 percent to 9.2 percent. From 1995 to the 12-month period ending June 30, 2002, Community Hospital's acute care market share in its service area declined from 34.0 percent to 25.9 percent. During that same period, Helen Ellis' acute care market share in Community Hospital's service area increased from 11.7 percent to 12.0 percent. In addition, acute care average occupancy rates at Mease Dunedin Hospital increased each year from 1999 through 2002. Acute care average occupancy at Mease Countryside Hospital exceeded 90 percent in 2000 and 2001, and was approximately 85 percent for the period ending June 30, 2002. Some of the loss in Community Hospital's market share is due to an out-migration of patients from its service area to hospitals in northern Pinellas and Hillsborough Counties. Market share in Community's service area by out-of- market providers increased from 33 percent in 1995 to 40 percent in 2002. Community Hospital's outdated hospital has hampered its ability to compete for patients in its service area. Mease is increasing its efforts to attract patients and currently completing a $92 million expansion of Mease Countryside Hospital. The project includes the development of 1,134 parking spaces on 30 acres of raw land north of the Mease Countryside Hospital campus and the addition of two floors to the hospital. It also involves the relocation of 51 acute care beds, the obstetrics program and the Neonatal Intensive Care Units from Mease Dunedin Hosptial to Mease Countryside Hospital. Mease is also seeking to more than double the size of the Countryside emergency department to handle its 62,000 emergency visits. With the transfer of licensed beds from Mease Dunedin Hospital to Mease Countryside Hospital, Mease will also convert formerly semi-private patient rooms to private rooms at Mease Dunedin Hospital. The approval of Community Hospital's relocated facility will enable it to better compete with the hospitals in the area and promote quality and cost- effectiveness. North Bay, on the other hand, is not operating at a distinct disadvantage, yet is still experiencing declining utilization. North Bay is the only community-owned, not-for- profit provider in western Pasco County and is a valuable asset to the city. Section 408.035(10), Florida Statutes: The costs and methods of the proposed construction, including the costs and methods or energy provision and the availability of alternative, less costly, or more effective methods of construction The parties stipulated that the project costs in both applications are reasonable to construct the replacement hospitals. Community Hospital's proposed construction cost per square foot is $175, and slightly less than North Bay's $178 proposal. The costs and methods of proposed construction for each proposal is reasonable. Given Community Hospital's severe site and facility problems, the evidence demonstrates that there is no reasonable, less costly, or more effective methods of construction available for its proposed replacement hospital. Additional "band-aide" approaches are not financially reasonable and will not enable Community Hospital to effectively compete. The facility is currently licensed for 401 beds, operates approximately 311 beds and is still undersized. The proposed replacement hospital will meet the standards in Florida Administrative Code Rule 59A-3.081, and will meet current building codes, including the Americans with Disabilities Act and the Guidelines for Design and Construction of Hospitals and Health Care Facilities, developed by the American Institute of Architects. The opponents' argue that Community Hospital will not utilize the 320 acute care beds proposed in its CON application, and therefore, a smaller facility is a less- costly alternative. In addition, Helen Ellis' architectural expert witness provided schematic design alternatives for Community Hospital to be expanded and replaced on-site, without providing a detailed and credible cost accounting of the alternatives. Given the evidence and the law, their arguments are not persuasive. While North Bay's replacement cost figures are reasonable, given the aforementioned reasons, including the fact that the facility is in reasonably good condition and can expand vertically, on balance, it is unreasonable for North Bay to construct a replacement facility in the Trinity area. Section 408.035(11), Florida Statutes: The applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent Community Hospital has consistently provided the most health care services to Medicaid patients and the medically indigent in Sub-District 5-1. Community Hospital agreed to provide at least ten percent of its patient days to Medicaid recipients. Similarly, North Bay agreed to provide 9.7 percent of its total annual patient days to Medicaid and charity patients combined. North Bay, by contrast, provided only 3.56 percent of its total patient days to Medicaid patients in 2002, and would have to significantly reverse a declining trend in its Medicaid provision to comply with the imposed condition. Community Hospital better satisfies the criterion. Section 408.035(12) has been stipulated as not applicable in this case. Adverse Impact on Existing Providers Historical figures demonstrate that hospital market shares are not static, but fluctuate with competition. No hospital is entitled to a specific or historic market share free from competition. While the applicants are located in health planning Sub-District 5-1 and Helen Ellis and the two Mease hospitals are located in health planning Sub-District 5- 2, they compete for business. None of the opponents is a disproportionate share, safety net, Medicaid provider. As a result, AHCA gives less consideration to any potential adverse financial impact upon them resulting from the approval of either application as a low priority. The opponents, however, argue that the approval of either replacement hospital would severely affect each of them. While the precise distance from the existing facilities to the relocation sites is relevant, it is clear that neither applicants' proposed site is unreasonably close to any of the existing providers. In fact, Community Hospital intends to locate its replacement facility three miles farther away from Helen Ellis and 1.5 miles farther away from Mease Dunedin Hospital. While Helen Ellis' primary service area is seemingly fluid, as noted by its chief operating officer's hearing and deposition testimony, and the Mease hospitals are located 15 to 20 miles south, they overlap parts of the applicants' primary service areas. Accordingly, each applicant concedes that the proposed increase in their patient volume would be derived from the growing population as well as existing providers. Although it is clear that the existing providers may be more affected by the approval of Community Hosptial's proposal, the exact degree to which they will be adversely impacted by either applicant is unknown. All parties agree, however, that the existing providers will experience less adverse affects by the approval of only one applicant, as opposed to two. Furthermore, Mease concedes that its hospitals will continue to aggressively compete and will remain profitable. In fact, Mease's adverse impact analysis does not show any credible reduction in loss of acute care admissions at Mease Countryside Hospital or Mease Dunedin Hospital until 2010. Even then, the reliable evidence demonstrates that the impact is negligible. Helen Ellis, on the other hand, will likely experience a greater loss of patient volume. To achieve its utilization projections, Community Hospital will aggressively compete for and increase market share in Pinellas County zip code 34689, which borders Pasco County. While that increase does not facially prove that Helen Ellis will be materially affected by Community Hospital's replacement hospital, Helen Ellis will confront targeted competition. To minimize the potential adverse affect, Helen Ellis will aggressively compete to expand its market share in the Pinellas County zip codes south of 34689, which is experiencing population growth. In addition, Helen Ellis is targeting broader service markets, and has filed an application to establish an open- heart surgery program. While Helen Ellis will experience greater competition and financial loss, there is insufficient evidence to conclude that it will experience material financial adverse impact as a result of Community Hospital's proposed relocation. In fact, Helen Ellis' impact analysis is less than reliable. In its contribution-margin analysis, Helen Ellis utilized its actual hospital financial data as filed with AHCA for the fiscal year October 1, 2001, to September 30, 2002. The analysis included total inpatient and total outpatient service revenues found in the filed financial data, including ambulatory services and ancillary services, yet it did not include the expenses incurred in generating ambulatory or ancillary services revenue. As a result, the overstated net revenue per patient day was applied to its speculative lost number of patient days which resulted in an inflated loss of net patient service revenue. Moreover, the evidence indicates that Helen Ellis' analysis incorrectly included operational revenue and excluded expenses related to its 18-bed skilled nursing unit since neither applicant intends to operate a skilled nursing unit. While including the skilled nursing unit revenues, the analysis failed to include the sub-acute inpatient days that produced those revenues, and thereby over inflated the projected total lost net patient service revenue by over one million dollars.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Community Hospital's CON Application No. 9539, to establish a 376-bed replacement hospital in Pasco County, Sub- District 5-1, be granted; and North Bay's CON Application No. 9538, to establish a 122-bed replacement hospital in Pasco County, Sub-District 5- 1, be denied. DONE AND ENTERED this 19th day of March, 2004, in Tallahassee, Leon County, Florida. S WILLIAM R. PFEIFFER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2004. COPIES FURNISHED: James C. Hauser, Esquire R. Terry Rigsby, Esquire Metz, Hauser & Husband, P.A. 215 South Monroe Street, Suite 505 Post Office Box 10909 Tallahassee, Florida 32302 Stephen A. Ecenia, Esquire R. David Prescott, Esquire Richard M. Ellis, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Saliba, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Darrell White, Esquire William B. Wiley, Esquire McFarlain & Cassedy, P.A. 305 South Gadsden Street, Suite 600 Tallahassee, Florida 32301 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Rhonda M. Medows, M.D., Secretary Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308

Florida Laws (3) 120.569408.035408.039
# 5
NORTHPORT HEALTH SERVICES OF FLORIDA, LLC, D/B/A CRYSTAL RIVER HEALTH AND REHABILITATION CENTER vs AGENCY FOR HEALTH CARE ADMINISTRATION, 14-001338 (2014)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Mar. 20, 2014 Number: 14-001338 Latest Update: May 23, 2014

Conclusions THE PARTIES resolved all disputed issues and executed a settlement agreement, which is attached and incorporated by reference. The parties are directed to comply with the terms of the attached settlement agreement. Based on the foregoing, this file is CLOSED. DONE AND ORDERED this toe day of Va V , 2014, in Tallahassee, Leon County, Florida. KM Lhe ElizAbeth Dud$k, Secretary Agency for Health Care Administration A PARTY WHO IS ADVERSELY AFFECTED BY THIS FINAL ORDER IS ENTITLED TO A JUDICIAL REVIEW WHICH SHALL BE INSTITUTED BY FILING ONE COPY OF A NOTICE OF APPEAL WITH THE AGENCY CLERK OF AHCA, AND A Filed May 23, 2014 8:40 AM Division of Administrative Hearings SECOND COPY ALONG WITH FILING FEE AS PRESCRIBED BY LAW, WITH THE DISTRICT COURT OF APPEAL IN THE APPELLATE DISTRICT WHERE THE AGENCY MAINTAINS ITS HEADQUARTERS OR WHERE A PARTY RESIDES. REVIEW PROCEEDINGS SHALL BE CONDUCTED IN ACCORDANCE WITH THE FLORIDA APPELLATE RULES. THE NOTICE OF APPEAL MUST BE FILED WITHIN 30 DAYS OF RENDITION OF THE ORDER TO BE REVIEWED. Copies furnished to: Theodore E Mack Powell & Mack 3700 Belwood Drive Tallahassee, Fl 32303 tmack@talstar.com (Via Electronic Mail) Shena L. Grantham Assistant General Counsel Mercedes Bosque, Audit Administrator (Interoffice mail) Finance & Accounting (Interoffice mail) CERTIFICATE OF SERVICE I HEREBY CERTIFY that a true and correct copy of the foregoing has been served on the aboygsnamed persons by Electronic Mail/U.S. Mail or interoffice mail as indicated on this the, /7 7 day of / 154 , 2014. : ——$__ <<] Se SSS Richard Shoop, Agency Clerk State of Florida Agency for Health Care Administration 2727 Mahan Drive, Building #3 Tallahassee, Florida 32308-5403

# 6
NEW PORT RICHEY HOSPITAL, INC., D/B/A COMMUNITY HOSPITAL OF NEW PORT RICHEY vs AGENCY FOR HEALTH CARE ADMINISTRATION AND MORTON PLANT HOSPITAL ASSOCIATION, INC., D/B/A NORTH BAY HOSPITAL, 02-003233CON (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 14, 2002 Number: 02-003233CON Latest Update: May 17, 2004

The Issue Whether the certificate of need (CON) applications filed by New Port Richey Hospital, Inc., d/b/a Community Hospital of New Port Richey (Community Hospital) (CON No. 9539), and Morton Plant Hospital Association, Inc., d/b/a North Bay Hospital (North Bay) (CON No. 9538), each seeking to replace and relocate their respective general acute care hospital, satisfy, on balance, the applicable statutory and rule criteria.

Findings Of Fact The Parties AHCA AHCA is the single state agency responsible for the administration of the CON program in Florida pursuant to Chapter 408, Florida Statutes (2000). The agency separately reviewed and preliminarily approved both applications. Community Hospital Community Hospital is a 300,000 square feet, accredited hospital with 345 licensed acute care beds and 56 licensed adult psychiatric beds, located in southern New Port Richey, Florida, within Sub-District 5-1. Community Hospital is seeking to construct a replacement facility approximately five miles to the southeast within a rapidly developing suburb known as "Trinity." Community Hospital currently provides a wide array of comprehensive inpatient and outpatient services and is the only provider of obstetrical and adult psychiatric services in Sub-District 5-1. It is the largest provider of emergency services in Pasco County with approximately 35,000 visits annually. It is also the largest provider of Medicaid and indigent patient days in Sub-District 5-1. Community Hospital was originally built in 1969 and is an aging facility. Although it has been renovated over time, the hospital is in poor condition. Community Hospital's average daily census is below 50 percent. North Bay North Bay is a 122-bed facility containing 102 licensed acute care beds and 20 licensed comprehensive medical rehabilitation beds, located approximately one mile north of Community Hospital in Sub-District 5-1. It serves a large elderly population and does not provide pediatric or obstetrical care. North Bay is also an aging facility and proposes to construct a replacement facility in the Trinity area. Notably, however, North Bay has spent approximately 12 million dollars over the past three years for physical improvements and is in reasonable physical condition. Helen Ellis Helen Ellis is an accredited hospital with 150 licensed acute care beds and 18 licensed skilled nursing unit beds. It is located in northern Pinellas County, approximately eight miles south of Community Hospital and nine miles south of North Bay. Helen Ellis provides a full array of acute care services including obstetrics and cardiac catheterization. Its daily census average has fluctuated over the years but is approximately 45 percent. Mease Mease operates two acute care hospitals in Pinellas County including Mease Dunedin Hospital, located approximately 18 to 20 miles south of the applicants and Mease Countryside Hospital, located approximately 16 to 18 miles south of Community and North Bay. Each hospital operates 189 licensed beds. The Mease hospitals are located in the adjacent acute care sub-district but compete with the applicants. The Health Planning District AHCA's Health Planning District 5 consists of Pinellas and Pasco Counties. U.S. Highway 41 runs north and south through the District and splits Pasco County into Sub- District 5-1 and Sub-District 5-2. Sub-District 5-1, where Community Hospital and North Bay are located, extends from U.S. 41 west to the Gulf Coast. Sub-District 5-2 extends from U.S. 41 to the eastern edge of Pasco County. Pinellas County is the most densely populated county in Florida and steadily grows at 5.52 percent per year. On the other hand, its neighbor to the north, Pasco County, has been experiencing over 15 percent annual growth in population. The evidence demonstrates that the area known as Trinity, located four to five miles southeast of New Port Richey, is largely responsible for the growth. With its large, single- owner land tracts, Trinity has become the area's fuel for growth, while New Port Richey, the older coastal anchor which houses the applicants' facilities, remains static. In addition to the available land in Trinity, roadway development in the southwest section of Pasco County is further fueling growth. For example, the Suncoast Highway, a major highway, was recently extended north from Hillsborough County through Sub-District 5-1, west of U.S. 41. It intersects with several large east-west thoroughfares including State Road 54, providing easy highway access to the Tampa area. The General Proposals Community Hospital's Proposal Community Hospital's CON application proposes to replace its existing, 401-bed hospital with a 376-bed state- of-the-art facility and relocate it approximately five miles to the southeast in the Trinity area. Community Hospital intends to construct a large medical office adjacent to its new facility and provide all of its current services including obstetrical care. It does not intend to change its primary service area. North Bay's Proposal North Bay's CON application proposes to replace its existing hospital with a 122-bed state-of-the-art facility and also plans to relocate it approximately eight miles to the southeast in the Trinity area of southwestern Pasco County. North Bay intends to provide the same array of services it currently offers its patients and will not provide pediatric and obstetrical care in the proposed facility. The proposed relocation site is adjacent to the Trinity Outpatient Center which is owned by North Bay's parent company, Morton Plant. The Outpatient Center offers a full range of diagnostic imaging services including nuclear medicine, cardiac nuclear stress testing, bone density scanning, CAT scanning, mammography, ultrasound, as well as many others. It also offers general and specialty ambulatory surgical services including urology; ear, nose and throat; ophthalmology; gastroenterology; endoscopy; and pain management. Approximately 14 physician offices are currently located at the Trinity Outpatient Center. The Condition of Community Hospital Facility Community Hospital's core facilities were constructed between 1969 and 1971. Additions to the hospital were made in 1973, 1975, 1976, 1977, 1979, 1981, 1992, and 1999. With an area of approximately 294,000 square feet and 401 licensed beds, or 733 square feet per bed, Community Hospital's gross area-to-bed ratio is approximately half of current hospital planning standards of 1,600 square feet per bed. With the exception of the "E" wing which was completed in 1999, all of the clinical and support departments are undersized. Medical-Surgical Beds And Intensive Care Units Community Hospital's "D" wing, constructed in 1975, is made up of two general medical-surgical unit floors which are grossly undersized. Each floor operates 47 general medical-surgical beds, 24 of which are in three-bed wards and 23 in semi-private rooms. None of the patient rooms in the "D" wing have showers or tubs so the patients bathe in a single facility located at the center of the wing on each floor. Community Hospital's "A" wing, added in 1973, is situated at the west end of the second floor and is also undersized. It too has a combination of semi-private rooms and three-bed wards without showers or tubs. Community Hospital's "F" wing, added in 1979, includes a medical-surgical unit on the second and third floor, each with semi-private and private rooms. The second floor unit is centrally located between a 56-bed adult psychiatric unit and the Surgical Intensive Care Unit (SICU) which creates security and privacy issues. The third floor unit is adjacent to the Medical Intensive Care Unit (MICU) which must be accessed through the medical-surgical unit. Neither intensive care unit (ICU) possesses an isolation area. Although the three-bed wards are generally restricted to in-season use, and not always full, they pose significant privacy, security, safety, and health concerns. They fail to meet minimum space requirements and are a serious health risk. The evidence demonstrates that reconfiguring the wards would be extremely costly and impractical due to code compliance issues. The wards hinder the hospital's acute care utilization, and impair its ability to effectively compete with other hospitals. Surgical Department and Recovery Community Hospital's surgical department is separated into two locations including the main surgical suite on the second floor and the Endoscopy/Pain Management unit located on the first floor of "C" wing. Consequently, the department cannot share support staff and space such as preparation and recovery. The main surgical suite, adjacent recovery room, and central sterile processing are 25 years old. This unit's operating rooms, cystoscopy rooms, storage areas, work- stations, central sterile, and recovery rooms are undersized and antiquated. The 12-bay Recovery Room has no patient toilet and is lacking storage. The soiled utility room is deficient. In addition, the patient bays are extremely narrow and separated by curtains. There is no direct connection to the sterile corridor, and staff must break the sterile field to transport patients from surgery to recovery. Moreover, surgery outpatients must pass through a major public lobby going to and returning from surgery. The Emergency Department Community Hospital's existing emergency department was constructed in 1992 and is the largest provider of hospital emergency services in Pasco County, handling approximately 35,000 visits per year. The hospital is also designated a "Baker Act" receiving facility under Chapter 394, Florida Statutes, and utilizes two secure examination rooms for emergent psychiatric patients. At less than 8,000 total square feet, the emergency department is severely undersized to meet the needs of its patients. The emergency department is currently undergoing renovation which will connect the triage area to the main emergency department. The renovation will not enlarge the entrance, waiting area, storage, nursing station, nor add privacy to the patient care areas in the emergency department. The renovation will not increase the total size of the emergency department, but in fact, the department's total bed availability will decrease by five beds. Similar to other departments, a more meaningful renovation cannot occur within the emergency department without triggering costly building code compliance measures. In addition to its space limitations, the emergency department is awkwardly located. In 1992, the emergency department was relocated to the front of the hospital and is completely separated from the diagnostic imaging department which remained in the original 1971 building. Consequently, emergency patients are routinely transported across the hospital for imaging and CT scans. Issues Relating to Replacement of Community Hospital Although physically possible, renovating and expanding Community Hospital's existing facility is unreasonable. First, it is cost prohibitive. Any significant renovation to the 1971, 1975, 1977, and 1979 structures would require asbestos abatement prior to construction, at an estimated cost of $1,000,000. In addition, as previously noted, the hospital will be saddled with the major expense of complying with all current building code requirements in the 40-year-old facility. Merely installing showers in patient rooms would immediately trigger a host of expensive, albeit necessary, code requirements involving access, wiring, square footage, fireproofing columns and beams, as well as floor/ceiling and roof/ceiling assemblies. Concurrent with the significant demolition and construction costs, the hospital will experience the incalculable expense and loss of revenue related to closing major portions, if not all, of the hospital. Second, renovation and expansion to the existing facility is an unreasonable option due to its physical restrictions. The 12'4" height of the hospital's first floor limits its ability to accommodate HVAC ductwork large enough to meet current ventilation requirements. In addition, there is inadequate space to expand any department within the confines of the existing hospital without cannibalizing adjacent areas, and vertical expansion is not an option. Community Hospital's application includes a lengthy Facility Condition Assessment which factually details the architectural, mechanical, and electrical deficiencies of the hospital's existing physical plant. The assessment is accurate and reasonable. Community Hospital's Proposed Replacement Community Hospital proposes to construct a six- story, 320 licensed beds, acute care replacement facility. The hospital will consist of 548,995 gross square feet and include a 56-bed adult psychiatric unit connected by a hallway to the first floor of the main hospital building. The proposal also includes the construction of an adjacent medical office building to centralize the outpatient offices and staff physicians. The evidence establishes that the deficiencies inherent in Community Hospital's existing hospital will be cured by its replacement hospital. All patients will be provided large private rooms. The emergency department will double in size, and contain private examination rooms. All building code requirements will be met or exceeded. Patients and staff will have separate elevators from the public. In addition, the surgical department will have large operating rooms, and adequate storage. The MICU and SICU will be adjacent to each other on the second floor to avoid unnecessary traffic within the hospital. Surgical patients will be transported to the ICU via a private elevator dedicated to that purpose. Medical-surgical patient rooms will be efficiently located on the third through sixth floors, in "double-T" configuration. Community Hospital's Existing and Proposed Sites Community Hospital is currently located on a 23-acre site inside the southern boundary of New Port Richey. Single- family homes and offices occupy the two-lane residential streets that surround the site on all sides. The hospital buildings are situated on the northern half of the site, with the main parking lot located to the south, in front of the main entrance to the hospital. Marine Parkway cuts through the southern half of the site from the west, and enters the main parking lot. A private medical mall sits immediately to the west of the main parking lot and a one-acre storm-water retention pond sits to the west of the mall. A private medical office building occupies the south end of the main parking lot and a four-acre drainage easement is located in the southwest corner of the site. Community Hospital's administration has actively analyzed its existing site, aging facility, and adjacent areas. It has commissioned studies by civil engineers, health care consultants, and architects. The collective evidence demonstrates that, although on-site relocation is potentially an option, on balance, it is not a reasonable option. Replacing Community Hospital on its existing site is not practical for several reasons. First, the hospital will experience significant disruption and may be required to completely close down for a period of time. Second, the site's southwestern large four-acre parcel is necessary for storm-water retention and is unavailable for expansion. Third, a reliable cost differential is unknown given Community Hospital's inability to successfully negotiate with the city and owners of the adjacent medical office complexes to acquire additional parcels. Fourth, acquiring other adjacent properties is not a viable option since they consist of individually owned residential lots. In addition to the site's physical restrictions, the site is hindered by its location. The hospital is situated in a neighborhood between small streets and a local school. From the north and south, motorists utilize either U.S. 19, a congested corridor that accommodates approximately 50,000 vehicles per day, or Grand and Madison Streets, two-lane streets within a school zone. From the east and west, motorists utilize similar two-lane neighborhood streets including Marine Parkway, which often floods in heavy rains. Community Hospital's proposed site, on the other hand, is a 53-acre tract positioned five miles from its current facility, at the intersection of two major thoroughfares in southwestern Pasco County. The proposed site offers ample space for all facilities, parking, outpatient care, and future expansion. In addition, Community Hospital's proposed site provides reasonable access to all patients within its existing primary service area made up of zip codes 34652, 34653, 34668, 34655, 34690, and 34691. For example, the average drive times from the population centers of each zip code to the existing site of the hospital and the proposed site are as follows: Zip code Difference Existing site Proposed site 34652 3 minutes 14 minutes 11 minutes 34653 8 minutes 11 minutes 3 minutes 34668 15 minutes 21 minutes 6 minutes 34655 11 minutes 4 minutes -7 minutes 34690 11 minutes 13 minutes 2 minutes 34691 11 minutes 17 minutes 6 minutes While the average drive time from the population centroids of zip codes 34653, 34668, 34690, and 34691 to the proposed site slightly increases, it decreases from the Trinity area, where population growth has been most significant in southwestern Pasco County. In addition, a motorist's average drive time from Community Hospital's existing location to its proposed site is only 10 to 11 minutes, and patients utilizing public transportation will be able to access the new hospital via a bus stop located adjacent to the proposed site. The Condition of North Bay Facility North Bay Hospital is also an aging facility. Its original structure and portions of its physical plant are approximately 30 years old. Portions of its major mechanical systems will soon require replacement including its boilers, air handlers, and chillers. In addition, the hospital is undersized and awkwardly configured. Despite its shortcomings, however, North Bay is generally in good condition. The hospital has been consistently renovated and updated over time and is aesthetically pleasing. Moreover, its second and third floors were added in 1986, are in good shape, and structurally capable of vertical expansion. Medical Surgical Beds and ICU Units By-in-large, North Bay is comprised of undersized, semi-private rooms containing toilet and shower facilities. The hospital does not have any three-bed wards. North Bay's first floor houses all ancillary and support services including lab, radiology, pharmacy, surgery, pre-op, post-anesthesia recovery, central sterile processing and supply, kitchen and cafeteria, housekeeping and administration, as well as the mechanical, electrical, and facilities maintenance and engineering. The first floor also contains a 20-bed CMR unit and a 15-bed acute care unit. North Bay's second and third floors are mostly comprised of semi-private rooms and supporting nursing stations. Although the rooms and stations are not ideally sized, they are in relatively good shape. North Bay utilizes a single ICU with ten critical care beds. The ICU rooms and nursing stations are also undersized. A four-bed ICU ward and former nursery are routinely used to serve overflow patients. Surgery Department and Recovery North Bay utilizes a single pre-operative surgical room for all of its surgery patients. The room accommodates up to five patient beds, but has limited space for storage and pre-operative procedures. Its operating rooms are sufficiently sized. While carts and large equipment are routinely stored in hallways throughout the surgical suite, North Bay has converted the former obstetrics recovery room to surgical storage and has made efficient use of other available space. North Bay operates a small six-bed Post Anesthesia Care Unit. Nurses routinely prepare patient medications in the unit which is often crowded with staff and patients. The Emergency Department North Bay has recently expanded its emergency department. The evidence demonstrates that this department is sufficient and meets current and future expected patient volumes. Replacement Issues Relating to North Bay While it is clear that areas of North Bay's physical plant are aging, the facility is in relatively good condition. It is apparent that North Bay must soon replace significant equipment, including cast-iron sewer pipes, plumbing, boilers, and chillers which will cause some interruption to hospital operations. However, North Bay's four-page written assessment of the facility and its argument citing the need for total replacement is, on balance, not persuasive. North Bay's Proposed Replacement North Bay proposes to construct a new, state-of-the- art, hospital approximately eight miles southeast of its existing facility and intends to offer the identical array of services the hospital currently provides. North Bay's Existing and Proposed Sites North Bay's existing hospital is located on an eight-acre site with limited storm-water drainage capacity. Consequently, much of its parking area is covered by deep, porous, gravel instead of asphalt. North Bay's existing site is generally surrounded by residential properties. While the city has committed, in writing, it willingness to assist both applicants with on-site expansion, it is unknown whether North Bay can acquire additional adjacent property. North Bay's proposed site is located at the intersection of Trinity Oaks Boulevard and Mitchell Boulevard, south of Community Hospital's proposed site, and is quite spacious. It contains sufficient land for the facilities, parking, and future growth, and has all necessary infrastructure in place, including utility systems, storm- water structures, and roadways. Currently however, there is no public transportation service available to North Bay's proposed site. Projected Utilization by Applicants The evidence presented at hearing indicates that, statewide, replacement hospitals often increase a provider's acute care bed utilization. For example, Bartow Memorial Hospital, Heart of Florida Regional Medical Center, Lake City Medical Center, Florida Hospital Heartland Medical Center, South Lake Hospital, and Florida Hospital-Fish Memorial each experienced significant increases in utilization following the opening of their new hospital. The applicants in this case each project an increase in utilization following the construction of their new facility. Specifically, Community Hospital's application projects 82,685 total hospital patient days (64,427 acute care patient days) in year one (2006) of the operation of its proposed replacement facility, and 86,201 total hospital patient days (67,648 acute care patient days) in year two (2007). Using projected 2006 and 2007 population estimates, applying 2002 acute care hospital use rates which are below 50 percent, and keeping Community Hospital's acute care market share constant at its 2002 level, it is reasonably estimated that Community Hospital's existing hospital will experience 52,623 acute care patient days in 2006, and 53,451 acute care patient days in 2007. Consequently, Community Hospital's proposed facility must attain 11,804 additional acute care patient days in 2006, and 14,197 more acute care patient days in 2007, in order to achieve its projected acute care utilization. Although Community Hospital lost eight percent of the acute care market in its service area between 1995 and 2002, two-thirds of that loss was due to residents of Sub- District 5-1 acquiring services in another area. While Community Hospital experienced 78,444 acute care patient days in 1995, it projects only 64,427 acute care patient days in year one. Given the new facility and population factors, it is reasonable that the hospital will recapture half of its lost acute care market share and achieve its projections. With respect to its psychiatric unit, Community Hospital projects 16,615 adult psychiatric inpatient days in year one (2006) and 17,069 adult inpatient days in year two (2007) of the proposed replacement hospital. The evidence indicates that these projections are reasonable. Similarly, North Bay's acute care utilization rate has been consistently below 50 percent. Since 1999, the hospital has experienced declining utilization. In its application, North Bay states that it achieved total actual acute care patient days of 21,925 in 2000 and 19,824 in 2001 and the evidence at hearing indicates that North Bay experienced 17,693 total acute care patient days in 2002. North Bay projects 25,909 acute care patient days in the first year of operation of its proposed replacement hospital, and 27,334 acute care patient days in the second year of operation. Despite each applicant's current facility utilization rate, Community Hospital must increase its current acute care patient days by 20 percent to reach its projected utilization, and North Bay must increase its patient days by at least 50 percent. Given the population trends, service mix and existing competition, the evidence demonstrates that it is not possible for both applicants to simultaneously achieve their projections. In fact, it is strongly noted that the applicants' own projections are predicated upon only one applicant being approved and cannot be supported with the approval of two facilities. Local Health Plan Preferences In its local health plan for District 5, the Suncoast Health Council, Inc., adopted acute care preferences in October, 2000. The replacement of an existing hospital is not specifically addressed by any of the preferences. However, certain acute care preferences and specialty care preferences are applicable. The first applicable preference provides that preference "shall be given to an applicant who proposes to locate a new facility in an area that will improve access for Medicaid and indigent patients." It is clear that the majority of Medicaid and indigent patients live closer to the existing hospitals. However, Community Hospital proposes to move 5.5 miles from its current location, whereas North Bay proposes to move eight miles from its current location. While the short distances alone are less than significant, North Bay's proposed location is further removed from New Port Richey, is not located on a major highway or bus-route, and would therefore be less accessible to the medically indigent residents. Community Hospital's proposed site will be accessible using public transportation. Furthermore, Community Hospital has consistently provided excellent service to the medically indigent and its proposal would better serve that population. In 2000, Community Hospital provided 7.4 percent of its total patient days to Medicaid patients and 0.8 percent of its total patient days to charity patients. Community Hospital provided the highest percentage and greatest number of Medicaid patient days in Sub-District 5-1. By comparison, North Bay provided 5.8 percent of its total patient days to Medicaid patients and 0.9 percent of its total patient days to charity patients. In 2002, North Bay's Medicaid patients days declined to 3.56 percent. Finally, given the closeness and available bed space of the existing providers and the increasing population in the Trinity area, access will be improved by Community Hospital's relocation. The second local health plan preference provides that "[i]n cases where an applicant is a corporation with previously awarded certificates of need, preference shall be given to those which follow through in a timely manner to construct and operate the additional facilities or beds and do not use them for later negotiations with other organizations seeking to enter or expand the number of beds they own or control." Both applicants meet this preference. The third local health plan preference recognizes "Certificate of Need applications that provide AHCA with documentation that they provide, or propose to provide, the largest percentage of Medicaid and charity care patient days in relation to other hospitals in the sub-district." Community Hospital provides the largest percentage of Medicaid and charity care patient days in relation to other hospitals in Sub-District 5-1, and therefore meets this preference. The fourth local health plan preference applies to "Certificate of Need applications that demonstrate intent to serve HIV/AIDS infected persons." Both applicants accept and treat HIV/AIDS infected persons, and would continue to do so in their proposed replacement hospitals. The fifth local health plan preference recognizes "Certificate of Need applications that commit to provide a full array of acute care services including medical-surgical, intensive care, pediatric, and obstetrical services within the sub-district for which they are applying." Community Hospital qualifies since it will continue to provide its current services, including obstetrical care and psychiatric care, in its proposed replacement hospital. North Bay discontinued its pediatric and obstetrical programs in 2001, does not intend to provide them in its proposed replacement hospital, and will not provide psychiatric care. Agency Rule Preferences Florida Administrative Code Rule 59C-1.038(6) provides an applicable preference to a facility proposing "new acute care services and capital expenditures" that has "a documented history of providing services to medically indigent patients or a commitment to do so." As the largest Medicaid provider in Sub-District 5-1, Community Hospital meets this preference better than does North Bay. North Bay's history demonstrates a declining rate of service to the medically indigent. Statutory Review Criteria Section 408.035(1), Florida Statutes: The need for the health care facilities and health services being proposed in relation to the applicable district health plan District 5 includes Pasco and Pinellas County. Pasco County is rapidly developing, whereas Pinellas County is the most densely populated county in Florida. Given the population trends, service mix, and utilization rates of the existing providers, on balance, there is a need for a replacement hospital in the Trinity area. Section 408.035(2), Florida Statutes: The availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district of the applicant Community Hospital and North Bay are both located in Sub-District 5-1. Each proposes to relocate to an area of southwestern Pasco County which is experiencing explosive population growth. The other general acute care hospital located in Sub-District 5-1 is Regional Medical Center Bayonet Point, which is located further north, in the Hudson area of western Pasco County. The only other acute care hospitals in Pasco County are East Pasco Medical Center, in Zephyrhills, and Pasco Community Hospital, in Dade City. Those hospitals are located in Sub-District 5-2, east Pasco County, far from the area proposed to be served by either Community Hospital or North Bay. District 5 includes Pinellas County as well as Pasco County. Helen Ellis and Mease are existing hospital providers located in Pinellas County. Helen Ellis has 168 licensed beds, consisting of 150 acute care beds and an 18-bed skilled nursing unit, and is located 7.9 miles from Community Hospital's existing location and 10.8 miles from Community Hospital's proposed location. Access to Helen Ellis for patients originating from southwestern Pasco County requires those patients to travel congested U.S. 19 south to Tarpon Springs. As a result, the average drive time from Community Hospital's existing and proposed site to Helen Ellis is approximately 22 minutes. Helen Ellis is not a reasonable alternative to Community Hospital's proposal. The applicants' proposals are specifically designed for the current and future health care needs of southwestern Pasco County. Given its financial history, it is unknown whether Helen Ellis will be financially capable of providing the necessary care to the residents of southwestern Pasco. Mease Countryside Hospital has 189 licensed acute care beds. It is located 16.0 miles from Community Hospital's existing location and 13.8 miles from Community Hospital's proposed location. The average drive time to Mease Countryside is 32 minutes from Community Hospital's existing site and 24 minutes from its proposed site. In addition, Mease Countryside Hospital has experienced extremely high utilization over the past several years, in excess of 90 percent for calendar years 2000 and 2001. Utilization at Mease Countryside Hospital has remained over 80 percent despite the addition of 45 acute care beds in April 2002. Given the growth and demand, it is unknown whether Mease can accommodate the residents in southwest Pasco County. Mease Dunedin Hospital has 189 licensed beds, consisting of 149 acute care beds, a 30-bed skilled nursing unit, five Level 2 neonatal intensive care beds, and five Level 3 neonatal intensive care beds. Its former 15-bed adult psychiatric unit has been converted into acute care beds. It is transferring its entire obstetrics program at Mease Dunedin Hospital to Mease Countryside Hospital. Mease Dunedin Hospital is located approximately 18 to 20 miles from the applicants' existing and proposed locations with an average drive time of 35-38 minutes. With their remote location, and the exceedingly high utilization at Mease Countryside Hospital, neither of the two Mease hospitals is a viable alternative to the applicants' proposals. In addition, the construction of a replacement hospital would positively impact economic development and further attract medical professionals to Sub-District 5-1. On balance, given the proximity, utilization, service array, and accessibility of the existing providers, including the applicants, the relocation of Community Hospital will enhance access to health care to the residents. Section 408.035(3), Florida Statutes: The ability of the applicant to provide quality of care and the applicant's record of providing quality of care As stipulated, both applicants provide excellent quality of care. However, Community Hospital's proposal will better enhance its ability to provide quality care. Community is currently undersized, non-compliant with today's standards, and located on a site that does not allow for reasonable expansion. Its emergency department is inadequate for patient volume, and the configuration of the first floor leads to inefficiencies in the diagnosis and treatment of emergency patients. Again, most inpatients are placed in semi-private rooms and three-bed wards, with no showers or tubs, little privacy, and an increased risk of infection. The hospital's waiting areas for families of patients are antiquated and undersized, its nursing stations are small and cramped and the operating rooms and storage facilities are undersized. Community Hospital's deficiencies will be effectively eliminated by its proposed replacement hospital. As a result, patients will experience qualitatively better care by the staff who serve them. Conversely, North Bay is in better physical condition and not in need of replacement. It has more reasonable options to expand or relocate its facility on site. Quality of care at North Bay will not be markedly enhanced by the construction of a new hospital. Sections 408.035(4)and(5), Florida Statutes, have been stipulated as not applicable in this case. Section 408.035(6), Florida Statutes: The availability of resources, including health personnel, management personnel, and funds available for capital and operating expenditures, for project accomplishment and operation The parties stipulated that both Community Hospital and North Bay have available health personnel and management personnel for project accomplishment and operation. In addition, the evidence proves that both applicants have sufficient funds for capital and operating expenditures. Community Hospital proposes to rely on its parent company to finance the project. Keith Giger, Vice-President of Finance for HCA, Inc., Community Hospital's parent organization, provided credible deposition testimony that HCA, Inc., will finance 100 percent of the total project cost by an inter-company loan at eight percent interest. Moreover, it is noted that the amount to be financed is actually $20 million less than the $196,849,328 stated in the CON Application, since Community Hospital previously purchased the proposed site in June 2003 with existing funds and does not need to finance the land acquisition. Community Hospital has sufficient working capital for operating expenditures of the proposed replacement hospital. North Bay, on the other hand, proposes to acquire financing from BayCare Obligated Group which includes Morton Plant Hospital Association, Inc.; Mease; and several other hospital entities. Its proposal, while feasible, is less certain since member hospitals must approve the indebtedness, thereby providing Mease with the ability to derail North Bay's proposed bond financing. Section 408.035(7), Florida Statutes: The extent to which the proposed services will enhance access to health care for residents of the service district The evidence proves that either proposal will enhance geographical access to the growing population in the service district. However, with its provision of obstetrical services, Community Hospital is better suited to address the needs of the younger community. With respect to financial access, both proposed relocation sites are slightly farther away from the higher elderly and indigent population centers. Since the evidence demonstrates that it is unreasonable to relocate both facilities away from the down-town area, Community Hospital's proposal, on balance, provides better access to poor patients. First, public transportation will be available to Community Hospital's site. Second, Community Hospital has an excellent record of providing care to the poor and indigent and has accepted the agency's condition to provide ten percent of its total annual patient days to Medicaid recipients To the contrary, North Bay's site will not be accessible by public transportation. In addition, North Bay has a less impressive record of providing care to the poor and indigent. Although AHCA conditioned North Bay's approval upon it providing 9.7 percent of total annual patient days to Medicaid and charity patients, instead of the 9.7 percent of gross annual revenue proposed in its application, North Bay has consistently provided Medicaid and charity patients less than seven percent of its total annual patient days. Section 408.035(8), Florida Statutes: The immediate and long-term financial feasibility of the proposal Immediate financial feasibility refers to the availability of funds to capitalize and operate the proposal. See Memorial Healthcare Group, Ltd. d/b/a Memorial Hospital Jacksonville vs. AHCA et al., Case No. 02-0447 et seq. Community Hospital has acquired reliable financing for the project and has sufficiently demonstrated that its project is immediately financially feasible. North Bay's short-term financial proposal is less secure. As noted, North Bay intends to acquire financing from BayCare Obligated Group. As a member of the group, Mease, the parent company of two hospitals that oppose North Bay's application, must approve the plan. Long-term financial feasibility is the ability of the project to reach a break-even point within a reasonable period of time and at a reasonable achievable point in the future. Big Bend Hospice, Inc. vs. AHCA and Covenant Hospice, Inc., Case No. 02-0455. Although CON pro forma financial schedules typically show profitability within two to three years of operation, it is not a requirement. In fact, in some circumstances, such as the case of a replacement hospital, it may be unrealistic for the proposal to project profitability before the third or fourth year of operation. In this case, Community Hospital's utilization projections, gross and net revenues, and expense figures are reasonable. The evidence reliably demonstrates that its replacement hospital will be profitable by the fourth year of operation. The hospital's financial projections are further supported by credible evidence, including the fact that the hospital experienced financial improvement in 2002 despite its poor physical condition, declining utilization, and lost market share to providers outside of its district. In addition, the development and population trends in the Trinity area support the need for a replacement hospital in the area. Also, Community Hospital has benefited from increases in its Medicaid per diem and renegotiated managed care contracts. North Bay's long-term financial feasibility of its proposal is less certain. In calendar year 2001, North Bay incurred an operating loss of $306,000. In calendar year 2002, it incurred a loss of $1,160,000. In its CON application, however, North Bay projects operating income of $1,538,827 in 2007, yet omitted the ongoing expenses of interest ($1,600,000) and depreciation ($3,000,000) from its existing facility that North Bay intends to continue operating. Since North Bay's proposal does not project beyond year two, it is less certain whether it is financially feasible in the third or fourth year. In addition to the interest and depreciation issues, North Bay's utilization projections are less reasonable than Community Hospital's proposal. While possible, North Bay will have a difficult task achieving its projected 55 percent increase in acute care patient days in its second year of operation given its declining utilization, loss of obstetric/pediatric services and termination of two exclusive managed care contracts. Section 408.035(9), Florida Statutes: The extent to which the proposal will foster competition that promotes quality and cost-effectiveness Both applicants have substantial unused capacity. However, Community Hospital's existing facility is at a distinct competitive disadvantage in the market place. In fact, from 1994 to 1998, Community Hospital's overall market share in its service area declined from 40.3 percent to 35.3 percent. During that same period, Helen Ellis' overall market share in Community Hospital's service area increased from 7.2 percent to 9.2 percent. From 1995 to the 12-month period ending June 30, 2002, Community Hospital's acute care market share in its service area declined from 34.0 percent to 25.9 percent. During that same period, Helen Ellis' acute care market share in Community Hospital's service area increased from 11.7 percent to 12.0 percent. In addition, acute care average occupancy rates at Mease Dunedin Hospital increased each year from 1999 through 2002. Acute care average occupancy at Mease Countryside Hospital exceeded 90 percent in 2000 and 2001, and was approximately 85 percent for the period ending June 30, 2002. Some of the loss in Community Hospital's market share is due to an out-migration of patients from its service area to hospitals in northern Pinellas and Hillsborough Counties. Market share in Community's service area by out-of- market providers increased from 33 percent in 1995 to 40 percent in 2002. Community Hospital's outdated hospital has hampered its ability to compete for patients in its service area. Mease is increasing its efforts to attract patients and currently completing a $92 million expansion of Mease Countryside Hospital. The project includes the development of 1,134 parking spaces on 30 acres of raw land north of the Mease Countryside Hospital campus and the addition of two floors to the hospital. It also involves the relocation of 51 acute care beds, the obstetrics program and the Neonatal Intensive Care Units from Mease Dunedin Hosptial to Mease Countryside Hospital. Mease is also seeking to more than double the size of the Countryside emergency department to handle its 62,000 emergency visits. With the transfer of licensed beds from Mease Dunedin Hospital to Mease Countryside Hospital, Mease will also convert formerly semi-private patient rooms to private rooms at Mease Dunedin Hospital. The approval of Community Hospital's relocated facility will enable it to better compete with the hospitals in the area and promote quality and cost- effectiveness. North Bay, on the other hand, is not operating at a distinct disadvantage, yet is still experiencing declining utilization. North Bay is the only community-owned, not-for- profit provider in western Pasco County and is a valuable asset to the city. Section 408.035(10), Florida Statutes: The costs and methods of the proposed construction, including the costs and methods or energy provision and the availability of alternative, less costly, or more effective methods of construction The parties stipulated that the project costs in both applications are reasonable to construct the replacement hospitals. Community Hospital's proposed construction cost per square foot is $175, and slightly less than North Bay's $178 proposal. The costs and methods of proposed construction for each proposal is reasonable. Given Community Hospital's severe site and facility problems, the evidence demonstrates that there is no reasonable, less costly, or more effective methods of construction available for its proposed replacement hospital. Additional "band-aide" approaches are not financially reasonable and will not enable Community Hospital to effectively compete. The facility is currently licensed for 401 beds, operates approximately 311 beds and is still undersized. The proposed replacement hospital will meet the standards in Florida Administrative Code Rule 59A-3.081, and will meet current building codes, including the Americans with Disabilities Act and the Guidelines for Design and Construction of Hospitals and Health Care Facilities, developed by the American Institute of Architects. The opponents' argue that Community Hospital will not utilize the 320 acute care beds proposed in its CON application, and therefore, a smaller facility is a less- costly alternative. In addition, Helen Ellis' architectural expert witness provided schematic design alternatives for Community Hospital to be expanded and replaced on-site, without providing a detailed and credible cost accounting of the alternatives. Given the evidence and the law, their arguments are not persuasive. While North Bay's replacement cost figures are reasonable, given the aforementioned reasons, including the fact that the facility is in reasonably good condition and can expand vertically, on balance, it is unreasonable for North Bay to construct a replacement facility in the Trinity area. Section 408.035(11), Florida Statutes: The applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent Community Hospital has consistently provided the most health care services to Medicaid patients and the medically indigent in Sub-District 5-1. Community Hospital agreed to provide at least ten percent of its patient days to Medicaid recipients. Similarly, North Bay agreed to provide 9.7 percent of its total annual patient days to Medicaid and charity patients combined. North Bay, by contrast, provided only 3.56 percent of its total patient days to Medicaid patients in 2002, and would have to significantly reverse a declining trend in its Medicaid provision to comply with the imposed condition. Community Hospital better satisfies the criterion. Section 408.035(12) has been stipulated as not applicable in this case. Adverse Impact on Existing Providers Historical figures demonstrate that hospital market shares are not static, but fluctuate with competition. No hospital is entitled to a specific or historic market share free from competition. While the applicants are located in health planning Sub-District 5-1 and Helen Ellis and the two Mease hospitals are located in health planning Sub-District 5- 2, they compete for business. None of the opponents is a disproportionate share, safety net, Medicaid provider. As a result, AHCA gives less consideration to any potential adverse financial impact upon them resulting from the approval of either application as a low priority. The opponents, however, argue that the approval of either replacement hospital would severely affect each of them. While the precise distance from the existing facilities to the relocation sites is relevant, it is clear that neither applicants' proposed site is unreasonably close to any of the existing providers. In fact, Community Hospital intends to locate its replacement facility three miles farther away from Helen Ellis and 1.5 miles farther away from Mease Dunedin Hospital. While Helen Ellis' primary service area is seemingly fluid, as noted by its chief operating officer's hearing and deposition testimony, and the Mease hospitals are located 15 to 20 miles south, they overlap parts of the applicants' primary service areas. Accordingly, each applicant concedes that the proposed increase in their patient volume would be derived from the growing population as well as existing providers. Although it is clear that the existing providers may be more affected by the approval of Community Hosptial's proposal, the exact degree to which they will be adversely impacted by either applicant is unknown. All parties agree, however, that the existing providers will experience less adverse affects by the approval of only one applicant, as opposed to two. Furthermore, Mease concedes that its hospitals will continue to aggressively compete and will remain profitable. In fact, Mease's adverse impact analysis does not show any credible reduction in loss of acute care admissions at Mease Countryside Hospital or Mease Dunedin Hospital until 2010. Even then, the reliable evidence demonstrates that the impact is negligible. Helen Ellis, on the other hand, will likely experience a greater loss of patient volume. To achieve its utilization projections, Community Hospital will aggressively compete for and increase market share in Pinellas County zip code 34689, which borders Pasco County. While that increase does not facially prove that Helen Ellis will be materially affected by Community Hospital's replacement hospital, Helen Ellis will confront targeted competition. To minimize the potential adverse affect, Helen Ellis will aggressively compete to expand its market share in the Pinellas County zip codes south of 34689, which is experiencing population growth. In addition, Helen Ellis is targeting broader service markets, and has filed an application to establish an open- heart surgery program. While Helen Ellis will experience greater competition and financial loss, there is insufficient evidence to conclude that it will experience material financial adverse impact as a result of Community Hospital's proposed relocation. In fact, Helen Ellis' impact analysis is less than reliable. In its contribution-margin analysis, Helen Ellis utilized its actual hospital financial data as filed with AHCA for the fiscal year October 1, 2001, to September 30, 2002. The analysis included total inpatient and total outpatient service revenues found in the filed financial data, including ambulatory services and ancillary services, yet it did not include the expenses incurred in generating ambulatory or ancillary services revenue. As a result, the overstated net revenue per patient day was applied to its speculative lost number of patient days which resulted in an inflated loss of net patient service revenue. Moreover, the evidence indicates that Helen Ellis' analysis incorrectly included operational revenue and excluded expenses related to its 18-bed skilled nursing unit since neither applicant intends to operate a skilled nursing unit. While including the skilled nursing unit revenues, the analysis failed to include the sub-acute inpatient days that produced those revenues, and thereby over inflated the projected total lost net patient service revenue by over one million dollars.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Community Hospital's CON Application No. 9539, to establish a 376-bed replacement hospital in Pasco County, Sub- District 5-1, be granted; and North Bay's CON Application No. 9538, to establish a 122-bed replacement hospital in Pasco County, Sub-District 5- 1, be denied. DONE AND ENTERED this 19th day of March, 2004, in Tallahassee, Leon County, Florida. S WILLIAM R. PFEIFFER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2004. COPIES FURNISHED: James C. Hauser, Esquire R. Terry Rigsby, Esquire Metz, Hauser & Husband, P.A. 215 South Monroe Street, Suite 505 Post Office Box 10909 Tallahassee, Florida 32302 Stephen A. Ecenia, Esquire R. David Prescott, Esquire Richard M. Ellis, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Saliba, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Darrell White, Esquire William B. Wiley, Esquire McFarlain & Cassedy, P.A. 305 South Gadsden Street, Suite 600 Tallahassee, Florida 32301 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Rhonda M. Medows, M.D., Secretary Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308

Florida Laws (3) 120.569408.035408.039
# 7
NEW PORT RICHEY HOSPITAL, INC., D/B/A COMMUNITY HOSPITAL OF NEW PORT vs AGENCY FOR HEALTH CARE ADMINISTRATION, 07-003483CON (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 26, 2007 Number: 07-003483CON Latest Update: Jan. 07, 2009

The Issue Whether there is need for a new hospital in AHCA Acute Care Subdistrict 5-2 (eastern Pasco County)? If so, whether AHCA should approve either CON 9975 or CON 9977?

Findings Of Fact The Applicants and Background Pasco-Pinellas Pasco-Pinellas, the applicant for CON 9975, is a joint venture between two nonprofit healthcare organizations: University Community Hospital, Inc. (UCH) and Adventist Health System Sunbelt Healthcare Corporation (Adventist). A not-for-profit healthcare system, UCH has served the Tampa Bay area for the last 40 years. It owns and operates two hospitals in Hillsborough County and one in Pinellas County. UCH has approximately $100 million available for capital expenditures to fund the hospital proposed by CON 9975. One of its Hillsborough County facilities, University Community Hospital, is located on Fletcher Avenue in northern Hillsborough County, AHCA Health Planning District VI. Across the street from the main campus of the University of South Florida (USF) and its College of Medicine, University Community Hospital has an agreement with USF for GME. University Community Hospital at present serves the Wesley Chapel area in eastern Pasco County. The other member of the joint venture, Adventist, is a financially successful not-for-profit healthcare organization. It operates 17 hospitals in the state of Florida. As of December 31, 2007, Adventist's cash on hand, including investments, exceeded $3.6 billion and net revenue for 2007 was approximately $368 million. The joint venture between UCH and Adventist was formed to establish a hospital to serve the Wesley Chapel area of Pasco County and to provide other healthcare services in the county. At present, the two members of the joint venture compete to serve the Wesley Chapel area through University Community Hospital and Adventist's Florida Hospital Zephyrhills (FHZ), a 154-bed general acute care hospital in Pasco County. The collaboration of competing hospitals in seeking approval for a new hospital through Florida's CON process is unusual. But by bringing the similar missions, strength in community interests and capable leadership of UCH and Adventist together, the Pasco Pinellas joint venture poses potential healthcare benefits to eastern Pasco County. BayCare The Applicant for CON 9977, BayCare of Southeast Pasco, Inc., is a not-for-profit corporation formed to develop the hospital proposed in the application. The sole member of BayCare is BayCare Health System, Inc. ("BayCare System"). BayCare System is the largest full-service community- based health care system in the Tampa Bay area. It operates 9 nonprofit hospitals and 11 ambulatory/outpatient centers in Hillsborough, Pasco and Pinellas counties. Initially organized in 1997 under a joint operating agreement between several hospitals, BayCare System's purpose has been to compete effectively in managed care operations in order to reduce the expenses of the individual organizations that are its members. In the first 5 years of operation, BayCare System saved its members a total of $90 million because of the enhanced cost efficiencies it achieved through business function consolidations and group purchasing. Its members are all not-for-profit hospitals. BayCare System's focus is on the treatment of one patient at a time. Its mission is to improve the lives of people in the community it serves, to operate effectively as a group of not-for-profit hospitals, and to provide high quality, compassionate healthcare. BayCare's application, because it provides potential for its proposal with its teaching aspects, draws significant and considerable support from USF, a national research university. USF has a College of Medicine, a College of Nursing, and a College of Public Health, collectively "USF Health." USF Health will collaborate with BayCare in the development of the hospital BayCare proposes, should it be approved and should its teaching functions come to fruition. The Agency The Agency for Health Care Administration is the state agency that administers the CON program pursuant to Section 408.034, Florida Statutes. It will make the final decisions to approve or deny the two CON applications at issue in this proceeding. Community Community Hospital is a general acute care for profit hospital with 386 beds. It is located within the City of New Port Richey in western Pasco County, Acute Care Subdistrict 5-1. With the exception of neonatal intensive care, open heart surgery and organ transplantation, Community is a full- service community hospital. It provides OB services. It is licensed for 46 adult psychiatric beds. It offers a variety of outpatient services including outpatient surgery, endoscopy, and outpatient procedures and lab testing. Its medical staff consists of approximately 400 physicians. Community serves patients without regard to ability to pay, and does not discriminate in any manner. Accredited by the Joint Commission on Accreditation of Hospital Organizations, it has received numerous awards and recognition for the quality of its health care services. Community's hospital facility is over 30 years old. Access to the campus from US 19, the closest major thoroughfare approximately 1.5 miles away, is gained via a two-lane street through a residential area. Land-locked but for the two-lane street, the campus is sandwiched between the residences and a high school. There are no medical office buildings ("MOB") owned by Community on the campus; less than 20 acres in size, it is completely built out. Community's Replacement Hospital Community has a replacement hospital facility currently under construction in Acute Care Subdistrict 5-2. Approximately five miles southeast of Community's New Port Richey location, the replacement facility is located at the intersection of Little Road and State Road 54. Expected to open in late 2010 at a cost in excess of $200 million, it is to be known as Medical Center of Trinity ("Trinity"). All current Community services will be offered at Trinity. At the same time, the new hospital will offer many advantages over the old facility. Trinity will initially be five stories in height, with fewer licensed beds, but constructed with the ability to expand. It will offer new medical equipment with the latest technology. Situated on 52 acres, with a new three-story MOB adjacent to the hospital, Trinity has plans to add a second MOB at some time in the future. Unlike existing Community Hospital, Trinity will have all private rooms. Its more efficient layout among service areas will improve efficiencies and patient satisfaction. Trinity's location is more accessible than Community's current location in New Port Richey. It is on State Road 54 (SR 54), a six-lane highway that runs east/west through Pasco County. The road has recently undergone major construction and expansion which was nearly complete at the time of hearing. Suncoast Parkway (a/k/a Veterans Expressway), furthermore, is an expressway toll road system that runs north/south from Hernando County through Pasco County to Tampa airport. From the intersection of Suncoast Parkway and SR 54, it takes approximately seven minutes to reach Trinity. Little Road runs north/south along the Trinity site, and north through Pasco County to Regional Medical Center Bayonet Point ("Bayonet Point"). Community's poor financial performance in recent years is expected to improve after the opening of Trinity. The Proposals Although both applicants propose a new hospital in roughly the same location in Subdistrict 5-2, the two are different both in scope and approach. Pasco-Pinellas' Proposal Pasco-Pinellas proposes to build an 80-bed acute care hospital on Bruce B. Downs Boulevard in the area known as Wesley Chapel in eastern Pasco County. If approved and constructed, the hospital will include 36 medical/surgical beds, 8 labor/delivery/recovery/post partum beds, 12 critical care beds, and 24 progressive care beds. The project would involve 184,000 gross square feet of new construction, at a total estimated cost of $121 million. Pasco-Pinellas proposes a typical primary service area (PSA). Five and one-half zip codes comprise the PSA; Pinellas- Pasco reasonably projects 82% of its admissions will come from the PSA. Two and one-half zip codes comprise the secondary service area (SSA). The zip code that is shared by the PSA and the SSA (33559) is split roughly in half between Pasco County and Hillsborough County. The half that is in Pasco County is in Pasco-Pinellas' PSA. The five full zip codes in the PSA are 33541, 33543, 33544, 34639, and 33576. The two full zip codes in the SSA are 33549 and 33647. Pasco-Pinellas' in-migration from outside its proposed service area (the PSA and the SSA) is forecast by Pasco- Pinellas's health planner at 12%. For a community hospital in the Wesley Chapel area without tertiary services, the in- migration percentage projected by Pasco-Pinellas is reasonable. BayCare's Proposal BayCare proposes to establish a general acute care hospital with 130 beds. The application proposes that it be collaboratively developed by BayCare System and USF Health so as to provide teaching functions associated with the USF College of Medicine and other health-related university components of USF Health. Consisting of approximately 476,000 square feet of new construction at an estimated total project cost of approximately $308 million, the hospital will have 92 medical/surgical beds, 24 critical care beds, and 14 post-partum beds. Like Pasco-Pinellas' proposal, BayCare's proposed hospital will be located on Bruce B. Downs Boulevard in the Wesley Chapel area of southeastern Pasco County. BayCare's proposed PSA is circular. The center point of the PSA is the proposed BayCare hospital site in the Wesley Chapel area. The circumference is along a series of seven-mile radii so that the diameter of the circular PSA is 14 miles. The seven-mile radius was chosen to approximate a fifteen-minute travel time by automobile from the outer edge of the circular PSA to the hospital site. BayCare's PSA includes some part of seven zip codes. Two are Wesley Chapel zip codes: 33543 and 33544. Two are Lutz area zip codes: 33549 and 33559. Two are Land O'Lakes zip codes: 34639 and 34638, and one is a zip code in Hillsborough County: 33647. Relative to typical PSAs for most proposed hospitals, the PSA proposed by BayCare's application was described at hearing by BayCare's health planner as "small." See Tr. 1855. For calendar years 2013 and 2014, BayCare projects that 19,0976 and 20,008 patient days, respectively, will be generated from within the PSA. These projections constitute a projection of 60% of all patient days projected for the two years, a percentage substantially lower than would be generated from a typical PSA. The remaining 40% of projected patient days is roughly double what would be expected from beyond a PSA under a more typical proposal. The high number of projected patient days for patients originating outside the PSA was explained at hearing by BayCare's health planner. The involvement of the USF Physician's Group and the "teaching" nature of the proposal "pumps up and provides an additive level of in-migration that would not be experienced without the USF combination with BayCare in [the] project." Tr. 1856-7. Pasco County Hospitals There are five hospitals in Pasco County. Two in western Pasco County will continue to remain in Subdistrict 5-1 in the near future: Regional Medical Center Bayonet Point, located in northwest Pasco County and Morton Plant North Bay Hospital, located in New Port Richey. Two are in eastern Pasco County, Subdistrict 5-2: Pasco Regional Medical Center in east central Pasco County, and FHZ, located in southeast Pasco. The fifth is Community/Trinity. No Need for Both Hospitals None of the parties contends there is need for both hospitals. Nor would such a contention be reasonable. Indeed, the record does not demonstrate need for both a new 80-bed community hospital as proposed by Pinellas-Pasco and a new 130- bed hospital that BayCare denominates a "teaching" hospital, each with an intended location on Bruce B. Downs Boulevard in the Wesley Chapel area of southeastern Pasco County in Subdistrict 5-2. The question remains: is there a need for one new hospital? If so, which of the two applications, if either, should be approved? Need for a New Hospital; Access Enhancement Among the counties in the Tampa Bay area, Pasco County has been the fastest growing in recent years. From 1990 to 2000, its population grew 22.6%. Three times higher than the state average, this represents tremendous growth for any locale. The Wesley Chapel area of south Pasco County roughly coincides with the PSAs of the two applicants. Dramatic growth over the last 20 years has marked the Wesley Chapel area's transformation from an agricultural area to a suburban community. North of Hillsborough County and its largest city, Tampa, improvements in the transportation network has made south Pasco County and in particular, the Wesley Chapel area, a bedroom community for workers commuting to Tampa. Claritas, a national demographic data service, is a generally accepted population projection source for CON applications. Claritas projects the growth in Pasco County to continue. For example, the projected population for Pasco- Pinellas' proposed PSA, which substantially overlaps with BayCare's proposed PSA, is 113,397 in 2011 and 118,505 in 2012. The Claritas projections are based on the most recent decennial U.S. Census, that is, 2000, and do not take into account data of impending population growth, such as new housing starts and new schools. Claritas, therefore, may understate projections in areas that have experienced more recent, rapid growth. The University of Florida Bureau of Economic and Business Research ("BEBR") also provides reliable population data by county. In the year 2000, the census for the Pasco County population was 344,765. By 2030, that population is projected by BEBR to grow to 526,100 based on low projections, 681,100 based on medium projections, and 876,900 based on high projections. For the high projection rate, this would constitute a 154% increase in population. Even assuming the low growth rate, the population would increase by 53%. According to BEBR data, the county can be expected to grow at a rate of 4.71% per year. Another source of population data relied upon by population experts is Demographics USA. The Demographics USA data shows a substantial growth in population for Pasco County. According to Demographics USA, the population for Pasco County can be expected to grow from 343,795 in the year 2000 to 440,527 in the year 2010 and then to 504,277 by the year 2015. Based on the Demographics USA data, the county can be expected to grow at a rate of 3.11% per year. The Wesley Chapel area is considered to be the area of Pasco County with the most development and development potential now and in the future. Of 175 major projects actively undergoing development in Pasco County, 76 are in the Wesley Chapel area. Between 2010 and 2012, the population in the area is projected to grow by 5,000 persons per year. With the increase in the general population in the area comes an expected increase in the need for schools. Of 37 schools identified by the Pasco County School Board to be built in the near future, 19 are to be located in the Wesley Chapel area. Whether the historic growth rate of the last few decades will continue for sure is an open question with the downturn in the economy and the housing market that commenced in Pasco County in mid-2007. Absent a major recession, however, it is reasonable to expect growth in the Wesley Chapel area to continue even if not at a rate as rapid as in the recent past. Whatever the future holds for Wesley Chapel's growth rate, there is clearly a demand for inpatient general acute care services in the Wesley Chapel area. The total non-tertiary discharges from the Pasco-Pinellas service area was 15,777, excluding newborns, for the 12-month period ending June 30, 2006. As a result, AHCA found the existing and growing population in the Wesley Chapel area warranted a new hospital. Along with significant growth in the Wesley Chapel area comes resulting traffic and healthcare and hospital access issues. Drive time analysis shows the average drive time from each of the Pasco-Pinellas PSA six area zip codes to the eight area hospitals in 2007 to be 46.11 minutes. The analysis shows that future drive time is expected to be lengthier, strengthening the need for a hospital in the Wesley Chapel area. In 2012, the average time increase is expected to 57.68 minutes. A Drive Time Study Report prepared by Diaz Pearson & Associates compared drive times to the proposed site for Pasco- Pinellas hospital to eight existing hospitals: UCH, Pasco Regional, FHZ, Tampa General, University Community Hospital on Dale Mabry in Tampa, St. Joseph's North, St. Joseph's in Tampa, and the site for Community's replacement hospital. The study concluded: The results of this travel study demonstrate that the vehicular travel times for access to the proposed PPHCHS Hospital [Pasco- Pinellas' Hospital] are consistently LESS for residents within the six Zip codes of the Primary Service Area for years 2007, 2011, and 2012 than for comparable trips to any of the eight area hospitals for alternate choice. Pasco-Pinellas 36, p. 27. Of particular note are the travel times from each of the six zip codes in Pasco-Pinellas' PSA to UCH, FHZ, and Tampa General. For example, a patient driving from the centroid point in zip code 33559 to UCH would take 24.28 minutes and to FHZ would take 37.97 minutes in 2007. This increases to 29.55 minutes and 50.94 minutes in 2012. Another example, the time it takes a patient to travel from zip code 33541 to Tampa General was 75.51 minutes in 2007. In 2012, the travel time is projected to increase approximately 20 minutes to 95.33 minutes. In contrast, a new hospital in the Wesley Chapel area would decrease travel times significantly for patients in the six zip code areas of the Pasco-Pinellas PSA. For example, in 2007, it would only take a zip code 33559 patient 11.41 minutes to reach the proposed site for Pasco-Pinellas. This represents a time savings of 12.87 minutes compared to the average driving time to UCH and 26.56 minutes compared to the average driving time to FHZ. In 2012, the reduction in time to drive to Pasco- Pinellas' proposed hospital site instead of UCH is 18.34 minutes and for FHZ, it is 39.53 minutes. The time savings for patients from the 33541 zip code traveling to Tampa General for non- tertiary services is even greater. Using Pasco-Pinellas' site in the Wesley Chapel area would save the patient 52.67 minutes in 2007 and is projected to save 63.88 minutes in 2012. Anecdotal evidence supports the need for a new hospital in the Wesley Chapel area. Dr. Niraj Patel practices obstetrics and gynecology in the Wesley Chapel area. A drive for him in good traffic is typically 20 minutes to UCH (the only hospital at which he practices because the distance between area hospitals is too great). In morning traffic during "rush" periods, the drive can exceed 40 minutes. Caught in such a drive in January of 2008, Dr. Patel missed the delivery of a patient's baby. He was required to appear before the UCH Medical Staff's credentials committee to "explain the situation . . . [because it] was the third or fourth [such] episode." Pasco-Pinellas 47, p. 11. As Dr. Patel explained in a pre- hearing deposition, "it doesn't fare well for me . . . credential and requirement wise but it doesn't fare well for the patient [who] had to be delivered by the nursing staff which [without a physician present] increases patient risk and [the chance] of complication[s]." Id. A new hospital in the Wesley Chapel area will provide residents of the Pasco-Pinellas PSA or the BayCare PSA with shorter travel time to a hospital compared to the time necessary to reach one of the eight existing hospitals in the region. In 2007, residents of the six zip codes in the Pasco-Pinellas' PSA could be expected to access Pasco-Pinellas' proposed hospital in a range of 10.9 to 21.8 minutes. For the year 2012, the time can be reasonably predicted to range from 17 to 31.4 minutes. In comparison the drive times to the eight hospitals in the region for residents of Pasco-Pinellas' PSA are significantly longer. In 2007, it took a resident in zip code 34639 approximately 55 minutes to get to UCH and 73 minutes to get to St. Joseph's Tampa. By 2012, those drive times are reasonably projected to increase to 64 minutes and 83 minutes, respectively. Simply put, travel times are expected to increase as the population increases in coming years. The site of Pasco-Pinellas' hospital is approximately one mile from the site of the proposed BayCare hospital. The travel times suggested for the residents of the Pasco-Pinellas PSA to the proposed Pasco-Pinellas hospital can be expected to be similar to travel times to the proposed BayCare hospital. Given the proximity of the two proposed sites, either will significantly reduce travel time to hospitals for patients in the Wesley Chapel area. The existence in the Wesley Chapel area of a community hospital with an emergency room and primary inpatient services will benefit doctors, patients and their families. Heightened driving concerns among elderly patients and traffic congestion and inadequate roadways that delay Emergency Medical services support the need for a Wesley Chapel area hospital. The support is based not only on 2007 travel times but also on the reasonable expectation that travel time will be greater in the future. Existing hospitals are capable of absorbing the increased need for acute care hospital services that result from the increased growth that is reasonably projected to occur in Subdistrict 5-2. If there is to be a new hospital in the subdistrict, the Wesley Chapel area is the best location for it. A new hospital in the Wesley Chapel area will enhance access to acute care services for residents of Subdistrict 5-2. Preliminary Agency Action; the SAAR The Agency determined that there is a need for a new hospital in the Wesley Chapel Area when it issued its State Agency Action Report on CONs 9975 and 9977. The Agency also determined that between the two applications, Pasco-Pinellas was superior and should therefore be approved over BayCare's. This determination was founded primarily on Pasco-Pinellas' application being more reasonable in terms of size and impacts on existing providers. The Agency maintained at hearing the position it took in it preliminary action memorialized by the SAAR. Jeffrey Gregg, Chief of AHCA's Bureau of Health Facility Regulation received in this proceeding as an expert in health planning and CON Review explained when called to the stand to testify: The proposal by [Pasco-Pinellas] was on the smaller side and gave us more comfort [than BayCare's] . . . [W]hile we . . . agree with these applicants that there is a hospital in the future of [the Wesley Chapel area], we are more comfortable with the conservative approach, the smaller approach [of Pasco- Pinellas], particularly given that should it be necessary in the future, any hospital can add beds, acute care beds, merely by notifying us. And we were more comfortable that [Pasco-Pinellas'] approach would be able to expand access and improve services for people in this area while at the same time minimally impacting all of the competitors. Tr. 1995. As detailed below, AHCA's determination that the Pasco-Pinellas application is superior to BayCare's is supported by the record even if the basis for the determination made on the state of the record is not quite the same as the basis advanced at hearing by AHCA. Size and Cost Pasco-Pinellas proposed hospital involves about 184,000 square feet of new construction at a cost of approximately $121 million dollars. It is much smaller and less costly than BayCare's proposed hospital of 476,000 square feet of new construction for about $308 million. The Pasco-Pinellas proposal is more reasonably sized to meet the needs of the Wesley Chapel area and, in turn, Subdistrict 5-2. The difference in size and cost of the two proposals, however, is a function of a major difference in approach in the applications. Pasco-Pinellas' proposal is for a typical community hospital that would start out with a bed size within a range that includes 80 beds. BayCare, on the other hand, proposes to serve not only the Wesley Chapel area and Subdistrict 5-2, but also a substantial population of patients to be drawn to the subdistrict particularly from Hillsborough County. Patients migrating to the hospital from outside the subdistrict will for the most part be the product of BayCare's affiliation with USF Health and its service to the USF College of Medicine in its proposal denominated in the application as a "teaching hospital." Need for a New Teaching Hospital "Teaching hospital" is a term defined in the Health Facility and Services Development Act, sections 408.031-408.045, Florida Statutes: "Teaching hospital" means any Florida hospital officially affiliated with an accredited Florida medical school which exhibits activity in the area of graduate medical education as reflected by at least seven different graduate medical education programs accredited by the Accreditation Council for Graduate Medical Education or the Council of Postdoctoral Training of the American Osteopathic Association and the presence of 100 or more full-time equivalent resident physicians. The Director of the Agency for Health Care Administration shall be responsible for determining which hospital meets this definition. § 408.07(45), Fla. Stat. The Agency has not determined that BayCare's proposal meets the statutory definition as directed by the statute for it to qualify as a "teaching hospital." The record indicates that the proposal is not a typical teaching hospital. For example, teaching hospitals in the United States are usually located near indigent populations to achieve the efficiency of training future practitioners with treating people who otherwise could not afford services. BayCare's proposal in a small county with a more affluent population does not serve that purpose. BayCare contends neither that it is a "statutory" teaching hospital nor that it should be determined by the Agency to meet the statutory definition of "teaching hospital." Instead it grounds its case for need in the teaching functions its proposal would fulfill for USF Health and in particular for the GME needs of the students of the USF College of Medicine and the results those teaching functions would produce. Considerable testimony was offered by BayCare at hearing with regard to GME and the needs and aspirations of the USF College of Medicine. The Dean of the College, Stephen K. Klasko, M.D., spiritedly and eloquently related a narrative of need which was supported and amplified by other witnesses including faculty members at the college. There were many elements to the narrative. Highlights include the hybrid nature of the USF College of Medicine, "acting like a research intensive medical school . . . in a community-based body" (tr. 1132)," its on-going successful striving towards becoming an academic center for world class physicians as evidenced by this year's receipt of a research grant from the National Institute for Health, "the largest . . . given to a medical school in the last four or five years," id., and the GME challenges the college faces in the Tampa Bay area such as the recent loss of its anesthesiology residency program. BayCare's opponents point out the many ways in which the proposal is not only not a statutory teaching hospital but does not fit a nationwide model for teaching hospitals. BayCare counters that its model is one of many different models for a teaching facility. Whatever the merits of the various assertions of the parties on the point, USF's need for a teaching facility will be filled at least in part by the BayCare proposal. It is not an exaggeration, moreover, to call USF's need in this regard compelling. USF's institution-specific need, however, does not fall under any of the CON review criteria. See paragraphs 167- 8, below, in the Conclusions of Law. Perhaps not unmindful of the limits of the criteria, BayCare's presented other evidence that flows from the teaching function of the BayCare proposal. Relevant to the general criterion of "need" in subsection (1) of the Statutory CON Review Criteria, the evidence relates to physician shortages. The Physician Shortage There is a shortage of physicians in the district as there is in Pasco County. The problem has statewide dimensions. The state is not doing enough to replace aging doctors in Florida with younger doctors. Nor are aging doctors providing sufficient emergency room call coverage. The physician shortage both in general and in emergency rooms in the state is likely to increase. Residents are more likely to remain and practice in the community in which they train. Residents in the Tampa Bay area, in particular, are more likely to remain in the Tampa Bay area to practice. Even 20 residents per year in training at BayCare's proposed hospital would make a difference in existing physician shortages. Should BayCare's proposed hospital be built and operated as contemplated, the teaching functions that BayCare's application proposes to offer at the hospital would serve as a step, however small, toward meeting Florida's physician shortage as well as the shortage in District V, Pasco County, Subdistrict 5-2 and the Tampa Bay area. Nonetheless, there is a feature of this case that undermines BayCare's claim that the proposal will aid the physician shortage and its denomination in the application of the proposal as a "teaching hospital." The feature is present in the agreement between USF and BayCare (the "BayCare and USF Agreement) to make the BayCare proposed hospital a University Hospital. The BayCare and USF Agreement The BayCare and USF Agreement contains a section devoted to implementation and termination. The following is excerpted from the section's six separately numbered paragraphs: The Parties [the University of South Florida Board of Trustees or USF and BayCare Health System, Inc.] shall negotiate in good faith all other terms and conditions relating to the execution and implementation of this Agreement, including, without limitation, any revisions to the provisions of the Articles of Incorporation and Bylaws of the Hospital Corporation, the terms and conditions of the Health Affiliation Agreement, the design and layout of the University Hospital . . . [etc.] and such other documents and instruments as the Parties may find necessary or desirable to implement the terms of this Agreement. In the event the Parties are unable to agree on all such terms and conditions and all such documents required to implement the terms and provisions of this Agreement despite their good faith efforts to do so, either Party shall have the option after a period of at least twenty four months from the Effective Date or six months after the final approval of the Certificate of Need for the University Hospital is received, whichever is longer, to terminate this Agreement on the terms described in this [s]ection . . . . BayCare 2, Appendix C, BayCare and USF Agreement, Section G, p. 8. (Emphasis supplied.) For USF to terminate, the terms include payment to BayCare of $500,000 and agreement that for five years after termination it will not enter into an affiliation or other agreement with any other provider for the establishment of a university hospital in Pasco County. See id. The ability of USF to terminate the agreement is not "at will." It requires good faith efforts to have been made at implementations that fail to work. Furthermore, termination is not without consequences. But the termination provision in the agreement is consistent with the lack of a condition in BayCare's application that the BayCare proposal be a teaching hospital, "one more detail that made [AHCA officials] scratch our heads about the characterization of this hospital as a teaching hospital." Tr. 2011. It is also consistent with USF's support for "legislation that would be statewide that would allow state medical schools at some point, if they chose to, to make it easier . . . to have a hospital or research hospital on campus . . . [of which] USF would be one . . . " Tr. 1190-91. Adverse Impact Providers Outside the District Evidence was produced at hearing about the adverse impact of approval of either of the two applications on providers outside the district. Objections to the evidence were taken under advisement pending consideration of post-hearing memoranda submitted by the parties. Upon consideration of the memoranda, the objections are sustained. See paragraphs 159-66, below, in the Conclusions of Law. Providers Within the District The Pasco-Pinellas proposal will have minimal impact on Community/Trinity Medical Center. Its impact on other hospitals will be minimal with the exception of its two partner hospitals--UCH and FHZ--and of those two, only FHZ is in the District. There will be no adverse impact on Community as a result of the BayCare proposal. There is little patient flow from eastern Pasco to the western Pasco hospitals. Only about 1% of the patients in eastern Pasco travel west for services at Community, Morton Plant or Bayonet Point. It is reasonable to project that there will be no material change in Community's patient draw as a result of the new Trinity Medical Center. The projections by Community's health care and financial experts of patient days that would be lost and adverse financial impact to Community/Trinity should the BayCare proposal be approved were based on faulty assumptions. The majority of the adverse impact from BayCare's proposal, as in the case of Pasco-Pinellas' proposal, will be on UCH and FHZ. Availability of Resources Nursing and Non-Nursing Staff Pasco-Pinellas should be able to recruit and retain nursing and other staff for its hospital based on the Adventist experience at FHZ. The nursing vacancy at FHZ is 1% lower than the vacancy rate reported by the Florida Hospital Association (7.5% and 8.5%, respectively.) The turn-over rate for nurses at FHZ is 12%, significantly lower than the national rate in the 18-19% range. Recruitment of nurses has been successful at FHZ particularly in the last few years. In 2007, FHZ hired 100 nurses and reduced its use of agency nursing staff by roughly 75%. Among its different recruitment tactics have been a foreign nursing program, education and training incentives, scholarships at local colleges and specialty pay programs. Pasco-Pinellas will use many of the same recruiting techniques that have been successful at FHZ. It is reasonably anticipated that the same recruitment practices employed by FHZ will work for Pasco-Pinellas. Many members of the current nursing staff at FHZ, moreover, live in the Wesley Chapel area and have expressed an interest in working at Pasco-Pinellas. Retention programs at FHZ have been aimed at retaining better nurses. These include the magnet concept and a self- governance program with "a unit based council and nursing council so nurses . . . practicing . . . at the bedside have the opportunity to help govern the practice of nursing." Tr. 225-6. Retention programs similar to those used at FHZ will be implemented at Pasco-Pinellas. Schedule 6 in Pasco-Pinellas application reflects anticipated staffing for its new hospital. The staffing model is consistent with staffing at other Adventist facilities, specifically FHZ. The average salaries and wages are based on actual salaries inflated forward to the projected date of opening. The FTEs per adjusted occupied bed are adequate and consistent with the staffing patterns at FHZ. All necessary staffing positions are accounted for and the number of FTEs and salaries are sufficient for the hospital to operate and provide high quality of care. The registered nurse FTEs, as opposed to LPNs and lower-level nursing care, in Schedule 6 offer optimal staffing to provide high quality care and positive patient safety. The nursing salaries are adequate for the time frame in which Pasco-Pinellas will open with a one-time 5% increase and a 4% increase per year from present until opening. Schedule 6 supports the reasonable expectation that Pasco-Pinellas will be able to recruit and hire nursing staff and retain an adequate staff. The proposed staffing pattern in Schedule 6 of the Pasco-Pinellas application, which includes nursing staff, moreover, is reasonable. BayCare has a comprehensive recruitment program for recruiting and retaining nursing personnel as well. The strategies include a partnership with the nursing programs at USF and St. Petersburg College. BayCare System provides additional training to its nurses and with regard to salaries has committed to remaining competitive in the market. BayCare's recruitment and retention initiatives have been successful. In the 2008 year to date at the time of hearing, BayCare System had been able to hire more experienced nurses that it did in 2007 for the same time period. Overall, the BayCare System has a turnover rate of about 15%. The RN vacancy is 10% with a 13% turnover rate. These figures are comparable to state and national figures; in some cases they are lower. With regard to non-nursing employees or team members, BayCare System also had developed recruitment initiatives that are targeted toward those individuals. BayCare System has a positive reputation in the community as a good place to work. As an example, the three St. Joseph's hospitals (St. Joseph', Women's and Children's) and South Florida Baptist received recognition among the "Best Work Places in Health Care" for the years 2005 and 2006. The award recognizes outstanding practices related to employees. BayCare has the ability to recruit and retain the staff necessary to staff the proposed BayCare SE Pasco hospital. The staffing projections in Schedule 6 of BayCare's application, which includes nursing staff, are reasonable. Physician Support Despite the physician shortage, both applicants should be able to adequately staff their hospitals with physicians as shown by the evidence with regard to physician support for the hospitals. Florida Medical Clinic (FMC), a multi-specialty physician group practice with 85 physicians, is the primary physician group that serves the Wesley Chapel area. Thirty percent of its members are family practitioners or specialists in internal medicine. The remainder of the members cover 20 or so specialties that include both secondary and tertiary specialties. FMC has determined that it will support the Pasco- Pinellas proposal through its physicians, admissions and outpatients activity. Ninety percent or more of the clinic's patients use the UCH and FHZ facilities. FMC has a long- standing relationship with the administrators, personnel, and strategic issues of FHZ and UCH and is comfortable developing future plans for a hospital facility in Wesley Chapel with the two organizations FMC is able to meet the needs of the Wesley Chapel community both today and in the future. In addition, there are numerous other individual physicians who practice in the Wesley Chapel area who "predominantly support University Community Medical Center and Florida Hospital in Zephyrhills." Tr. 63. Having relationships with physicians already in a market when a hospital is being developed is advantageous to the new hospital. Among other advantages, it minimizes resources used to recruit and move new physicians into the area. In contrast to support for the Pasco-Pinellas proposal, FMC has not made a commitment to BayCare as to its proposal because of lack of knowledge about the structure of the facility, its strategic plans and whether or not FMC's interests align with the BayCare proposal but it has not foreclosed such a commitment. The USF physicians group will be a source of many of the physicians who will staff the BayCare proposed hospital, a likely reason for FMC's lukewarm to non-existing support for BayCare's proposal. USF emergency physicians will staff the Emergency Department. The BayCare System has approximately 28 physicians with privileges at BayCare System facilities with offices in the Wesley Chapel area. The proposed BayCare hospital will be staffed by recruited physicians and USF faculty physicians. Other physicians from the Wesley Chapel area provided testimony of their support for the BayCare proposal. It is reasonable to anticipate that some local Wesley Chapel area physicians will join the medical staff of the proposed BayCare hospital. Despite the physician shortages in the subdistrict, District V and the Tampa Bay area, both Pasco-Pinellas and BayCare will be able to staff their hospitals adequately with physicians. Charity and Medicaid; Conditions Pasco-Pinellas committed to a number of conditions of its applications. These include a 12.6% commitment to charity and Medicaid; the establishment of funding for a clinic for the underserved, provision of educational programs for the community, and two neonatal transports and funding for local fire and rescue services. BayCare projects a 6.1% level of charity care, 2.4% higher than Pasco-Pinellas' charity care commitment. It projects 10.3% of its Medicaid and Medicaid HMO patients will be attributable to Medicaid and Medicaid HMO patients versus 8.9% at Pasco-Pinellas. BayCare System has a history of providing services to Medicaid and Charity Patients. In 2006, for example, as not- for-profit entities, BayCare System facilities and related entities provided a total community benefit of $135 million in uncompensated care. Approximately 50% was pure charity care. BayCare System facilities currently serve patients from the Wesley Chapel area, including, of course, Medicaid and charity patients. BayCare System facilities provide 57% of the charity care and 31% of the Medicaid in the market. St. Joseph's Children's Hospital and St. Joseph's Women's Hospital operate at approximately 50-to-60% Medicaid and un-reimbursed care. St. Joseph's Hospital currently serves approximately 20% of the patients from the Wesley Chapel area. St. Joseph's, however, provides 36% of the total charity, Medicaid, and Medicaid HMO care rendered to patients who reside in the Wesley Chapel area. Thus, the facilities within the BayCare System have a demonstrated track record of providing care without regard to a patient's resources. In light of the record, it is reasonable to expect BayCare to carry on in the same vein under the BayCare proposal. Utilization Schedule 5 relates to projected utilization after project completion. The projections in the schedule in Pasco- Pinellas' application were developed by looking at service area population, applying a use rate growth and taking a market share by individual zip code. They are based on the expectation that the hospital would be operating at approximately 70% occupancy in its third year of operation, which equates to an average census of approximately 56 patients. The assumptions contained in the schedule are reasonable. The utilization projections in Schedule 5 in Pasco- Pinellas' application are reasonable; they indicate that an 80- bed hospital is appropriate to meet the need for a new hospital in the Wesley Chapel area of the subdistrict. BayCare will able to achieve its projected utilization from its primary service area and from the 40% of its patients it expects to receive by way of in-migration. The population forecast and market share forecast for the primary service area are reasonable. While the support among local physicians is much stronger for the Pasco-Pinellas proposal, it is likely that they will admit patients to the BayCare proposed hospital since it will be in the Wesley Chapel area, the area of the subdistrict that is most suitable for a new hospital. The 40% projected in-migration from outside of the seven mile service area is a reasonable projection. It is reasonable to expect that the bulk of these admissions will come from USF physicians located at the USF north Hillsborough campus. Projected Revenues Schedule 7A governs projected revenues. The payor mix in Schedule 7A of Pasco-Pinellas' application is based on historic admission and patient days by payor class occurring in the proposed Pasco-Pinellas service area based on the most recent available AHCA data. Gross charges and net revenues were developed based on historical data from FHZ as reported to AHCA. These figures were inflated forward using a net increase over all in revenue payments of approximately 3%. The projected revenues including net revenues in Schedule 7A of Pasco- Pinellas' application are reasonable and consistent with the marketplace. The payor mix in BayCare's Schedule 7A was based on an analysis of patient discharge data from the proposed primary service area plus an analysis of the experience of other BayCare System facilities in the same market. It is a reasonable payor mix. It allows for consideration of the experience of BayCare System, including the high level of charity care and Medicaid and Medicaid HMO services and at the same time reflects that the Wesley Chapel area is more affluent and younger than other areas of Pasco and Hillsborough Counties. BayCare's revenue assumptions were based on an analysis of gross and net revenue per patient day from another BayCare System facility, South Florida Baptist. Financial class specific projected patient days were applied to derive a gross and net revenue number for each of the three pro forma years for the proposed project denominated by Schedule 7A as "Projected Operating Year 1, 2 and 3" and ending "12/31/11, 12/31/12 and 12/31/13" respectively as indicated by BayCare in the application. See BayCare 2, pp. 133-135. The 2006 South Florida Baptist gross and net revenue per patient day were trended forward for each of the three projected operating years to reach the projected revenue figures in Schedule 7A. The projected revenues in Schedule 7A of the BayCare application are reasonable. Projected Income and Expenses Schedule 8A in a CON application contains projected income and expenses for the proposal. Pasco-Pinellas' application used a methodology in Schedule 8 that its expert had used in other CON cases. The methodology is consistent with methodologies of other health care experts and has been accepted in recommended and final orders in CON cases. The projections in Schedule 8 of Pasco-Pinellas' application are appropriate and reasonable. BayCare's methodology used to project income and expenses in Schedule 8A is also appropriate and reasonable. BayCare's healthcare finance expert asked BayCare financial analysts to look at his initial projections. They recommended that expenses be increased in physical therapy, radiology lab and pharmacy and that expense be reduced in plant operations. The recommendations were accepted; the projections were adjusted. Medicare GME reimbursement in year 3 of operations was assumed to be $1.7 million. If no addition Medicare GME reimbursement were received, BayCare's proposal would still show a profit of $2.8 million by year 3. It is virtually certain, moreover, that some portion of the $1.7 million included in calculation of BayCare's income projections will be realized. However valid criticism of the inclusion of the $1.7 million, BayCare's proposal remains financially feasible in the long- term. Financial Feasibility Pasco-Pinellas proved the immediate and long-term financial feasibility of its proposal. The schedules in its application related to financial feasibility used reasonable methodologies that yielded reasonable projections. Analysis of capital costs and funding is contained in Schedules 1 through 3. Schedule 1 presents an accurate summation of total project cost. That figure, $121 million, is a reasonable and typical cost for a new 80-bed community hospital. The $149 million on Schedule 2 reflects an accurate summation of anticipated capital costs, including the hospital project and necessary capital expenditures for the first tow or three years of operation. Schedule 3 set forth the sources of funding, a combination of equity and debt financing, discussed below. Both UCH and Adventist are financially successful systems. They will have not difficulty funding the Pasco- Pinellas proposal. As of December 31, 2007, Adventist's net revenue was approximately $368 million. About $100 million in funds were available to UCH at the time of hearing to contribute to development of the project. Due to the financial strength of its members, Pasco- Pinellas will easily be able to fund the project through a combination of equity and debt. The equity, $45 million, will be provided equally by Adventist and UCH, $22.5 million each. The remaining $76 million will be financed through tax-free bonds issued by Ziegler Securities. The project is immediately financially feasible. The Pasco-Pinellas project is also financially feasible in the long-term. Schedule 8 in the application, year 3, shows the project will generate a return of approximately $5.3 million in revenue over expenses, an amount that "more than meet[s] the test for financial feasibility in the long-term." Id. Based on the sources of BayCare System, BayCare has access to the financial resources to implement its proposed hospital. Funding for the hospital will come from BayCare System on the basis of 50% debt and 50% equity investment. As of early 2008, BayCare System had approximately $1.2 billion in unrestricted cash on hand. BayCare System's financial strength will allow BayCare to obtain the financing it needs for the project. Schedule 3 of the BayCare application sets forth an accurate and reasonable statement of the sources of funds necessary to develop the project. The immediate financial feasibility of BayCare's proposal is demonstrated by the evidence presented by BayCare. By year three of the pro forma, the BayCare proposal is reasonably projected to generate a net income over expenses in the amount of $4,498,637. BayCare demonstrated that the proposal's long-term financial feasibility. Costs and Construction Methods The costs and methods of the proposed construction of the Pasco-Pinellas project are reasonable. The facility is adequately sized and programmed for the services included in the Pasco-Pinellas application. All of the departments, including central storage, fall within an appropriate benchmark range for community hospitals. The 2,300 square feet per bed is reasonable as are the construction costs when compared to similar community hospitals. The proposed Pasco-Pinellas facility meets the codes for all of the services included in the application. The design of the Pasco-Pinellas facility enable expansion. The designed expansion capabilities are reasonable, logical and appropriate to meet the needs of the Wesley Chapel community. The drawings contained in the CON application show an efficient community hospital. The departments allow for efficient intra-department circulation and department-to- department circulation. There are adequate separation of public and staff flow corridors. All of the areas and departments as shown in the Pasco-Pinellas plans are code compliant. The layout of the patient rooms is consistent with industry standards for the design of single patient rooms. The number and size of the operating rooms are adequate and appropriate for an 80-bed community hospital not offering tertiary services. The emergency department, including the trauma room, complies with code and its layout is adequate and appropriate for an 80-bed hospital. The ambulance entrance in relation to the trauma bay allows for efficient location of patients based on acuity level. The number of treatment beds, treatment bays, including observation areas, provide adequate emergency department capacity. The Schedule 1 costs set forth in the BayCare application are reasonable. These costs include projected costs associated with necessary medical equipment. The medical equipment costs set forth in Schedule 1 are reasonable and BayCare has properly accounted for the items and costs of equipment necessary to operate the hospital. The Schedule 9 construction costs of approximately $180 million are reasonable as are the construction costs per square foot ($347 versus $325 for Pasco-Pinellas). Contingencies and escalation factors have been built into the projected costs. Facilities, Sites, Related Costs At the time the UCH and Adventist joint venture was formed, UCH had a parcel of land under contract located on State Road 54 across from the Saddlebrook Resort (the "UCH Parcel"). When it filed its application, Pasco-Pinellas hoped the UCH Parcel would serve as the site of its hospital. In fact, Pasco- Pinellas touted the location of the parcel for meeting the need of the growing population in Pasco County when it represented in the application that the UCH Parcel is the center point of the Wesley Chapel area. Close to Interstate 75, the UCH Parcel is a good location for a hospital. Pasco-Pinellas' aspiration for the use of the parcel was defeated, however, when the Pasco County denied a request to re-zone the UCH Parcel for use as a hospital. After the inability to have the UCH Parcel re-zoned, Pasco-Pinellas changed the site for the hospital to a parcel owned by FHZ (the "Pasco-Pinellas Site"). Located on Bruce B. Downs Boulevard, a major north-south corridor in the Wesley Chapel area, the site is 51.5 acres. The Pasco-Pinellas Site had been purchased by FHZ in 2001 with the intention of using it for a hospital. Subject to a height variance to allow a seven-story building, the site is zoned for special use as a hospital and related medical uses. The site has good visibility and access from Bruce B. Downs Boulevard as evidenced by its compliance with the State Road 581 (Bruce B. Downs Boulevard) access management plan. It meets other regulatory requirements such as the minimum spacing criteria for Pasco County. The Pasco-Pinellas Site is governed by a development order associated with the Wiregrass Ranch Development of Regional Impact (the "Wiregrass DRI DO"). The Wiregrass DRI DO "indicates that the phasing schedule assumed 100 hospital beds would be developed within the building phase." Tr. 597. As explained at hearing by Lara Daly, Pasco-Pinellas' expert in civil engineering and property site development, there are other aspects of the Wiregrass DRI DO, "like trade-off matrices" and "entitlement advancements" that indicate "entitlements are not limited on a parcel-by-parcel basis." Tr. 598. The assumption, therefore, does not necessarily restrict the number of hospital beds on the Pasco-Pinellas Site; rather it allows impacts associated with 100 hospital beds. The number of allowable beds may be increased following action taken under other provisions of the Wiregrass DRI DO. A significant portion of the Pasco-Pinellas Site is wetlands: some of low quality, some of high quality. The higher quality wetlands, referred to in the record as "a high quality category 1 wetland as defined by Pasco County," tr. 552, (the "Category 1 Wetland") are on the north and east perimeter of the site. The project is designed so as to have no impacts on the Category 1 Wetland. The only potential impact to these high quality wetlands is if there were a county-mandated road to be built in their vicinity. The lesser quality wetlands located in the interior of the site are herbaceous in nature or an open water feature that is "an older borrow pit that naturalized over time." Tr. 552-53. These lower quality wetlands constitute roughly 11.5 acres of the site. They will be impacted by the project but it is reasonable to expect that the impacts will be permitted. As Ms. Daly put it at hearing, "[a]fter reviewing, running stormwater models, looking at the proposed wetland impacts, coming up with appropriate mitigation ratios based on our experience elsewhere on the Wiregrass site, the site will accommodate all the necessary wetland and floodplain historic basin compensation . . . ." Tr. 550. The costs contained in Schedule 1 of the application were arrived assuming the use of the UCH Parcel as the site for the Pasco-Pinellas project. The Pasco-Pinellas Site requires expenditures for site preparation and other expenditures, such as wetland mitigation, related to the site that were not required had the UCH Parcel been used. For example, three potential foundation systems have been suggested for the hospital because of the wetland and subsurface conditions on the Pasco-Pinellas Site had the UCH Parcel been the site. Using the most expensive of the three, however, would not cause Pasco- Pinellas to exceed the construction costs contained in Schedule 1 of the CON Application. The land acquisition costs were reasonably projected to be less for the Pinellas-Pasco Site than for the UCH Parcel as reflected in the application. All told, the estimated project cost using the Pasco-Pinellas site was not materially different from the cost projected in the application and presented the possibility of being less than the $121 million reflected in the application. Likewise, the equipment cost figure shown in Schedule 1 of the Pasco-Pinellas application is reasonable and achievable. The total of the costs for the project sited at the Pasco-Pinellas Site, despite the change of site that occurred after the filing of the application, should not exceed the total of the costs listed in the Pasco-Pinellas application. The preponderance of the evidence is that the Pasco- Pinellas Site should ultimately qualify as an appropriate, developable site for the Pasco-Pinellas project. The BayCare site, north of Highway 56 and bordering I-75, (the "BayCare Site") includes two parcels of 54 and 17 acres. The 54 contiguous acres will be used for the hospital, outpatient services, and a planned medical office building. The 17 acres will be used for research space, physician office space, and academic training space necessary for the research and education function at the project. BayCare has the appropriate zoning and approvals necessary to develop the hospital. The hospital will have all private beds. It will be fully digital and will rely on electronic medical records. The BayCare Site is well suited for construction of the hospital and related buildings. The available footprint and design of the hospital, which includes shelled-in space, will readily allow for future expansion of the hospital up to 300 beds. Design of the BayCare facility is based on principles of family-centered care, flexibility to allow for change and future growth, efficiency, a quality of environment for teaching, a sustainable, green building, and patient safety. A "health building" with improved environmental quality and energy efficiency, the facility will seek LEED certification given to facilities constructed to have minimal adverse environmental impact. In keeping with the teaching function intended by the application, the facility's design includes additional work space, reading areas, sleep areas and conference rooms to facilitate teaching. Overall, the BayCare facility is twice as large as the Pasco-Pinellas facility. Size has its advantages. For example, it allows for larger treatment patient areas. But the facility is much more expensive to build. It is reasonably projected to cost more than $180 million above the costs associated with the Pasco-Pinellas facility which is more than twice as much. The high expense associated with the BayCare facility is shown by its cost per bed: in excess of $2 million-- much more than the cost per bed of the Pasco-Pinellas facility.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Agency for Health Care Administration approve CON 9975, Pasco-Pinellas' application for a new hospital in AHCA Subdistrict 5-2, and deny CON 9977, BayCare's application for a new hospital in the same subdistrict. DONE AND ENTERED this 28th day of October, 2008, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of October, 2008. COPIES FURNISHED: Richard J. Shoop, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Building 3 Mail Station 3 Tallahassee, Florida 32308 Craig H. Smith, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Building 3 Mail Station 3 Tallahassee, Florida 32308 Karin M. Byrne, Esquire Agency for Health Care Administration 2727 Mahan Drive, Building 3 Mail Station 3 Tallahassee, Florida 32308 Stephen K. Boone, Esquire Boone, Boone, Boone, Koda & Frook, P.A. 1001 Avenida Del Circo Post Office Box 1596 Venice, Florida 34284 Jonathan L. Rue, Esquire Parker, Hudson, Rainer & Dobbs, LLP 1500 Marquis Two Tower 285 Peachtree Center Avenue Northeast Atlanta, Georgia 30303 Robert A. Weiss, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 R. David Prescott, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551

Florida Laws (5) 26.56408.034408.035408.039408.07
# 8
NORTH MIAMI GENERAL HOSPITAL vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 77-000301 (1977)
Division of Administrative Hearings, Florida Number: 77-000301 Latest Update: Jul. 19, 1977

Findings Of Fact At the time of the denial of petitioner's request for a certificate of need, on January 18, 1977, nine CAT-Scanners were operational in Dade County. Two additional CAT-Scanners had been granted certificates of need approval and were on order. Three additional physician owned scanners for which certificate of need is not relevant were also on order. Of the nine CAT-Scanners currently operational in Dade County six were granted certificates of need and the remaining three are physician owned. During the calendar year 1976 three of the CAT-Scanners in operation in Dade County performed less than 2,000 scans. The lowest performed 1256. On the other hand the most active CAT-Scanner, which is owned by a physician, operated 14 hours per day and performed 3,269 scans. The next highest number of scans was performed by the CAT-Scanner at Jackson Memorial Hospital which numbered 3,059. Guidelines established by HRS for granting certificate of need approval for CAT-Scanners is 2,400 scans per year. This number is based on an average of 10 scans per day, 240 days per year. This excludes week-ends and holidays. The national average of scans per day per machine is 13 which indicates the average machine does at least 2,750 scans per year. The cost per scan is the total yearly cost for running the scanner divided by the number of scans done in a year. Although the cost of operating the scanner varies with the number of procedures done these variable costs are relatively small as compared to indirect costs and total costs. A doubling of the number of patients from 40 to 80 per week leads to only a 14 percent increase in total costs (Exhibit 16). In the United States in 1976 Florida was second only to California in the total number of CAT-Scanners with 27 compared to California's 60. However, Florida has one machine per 310,000 population and California one machine per 353,000 population. Of the 27 machines in Florida at the time of that determination seven were located in Dade County. Dade County then provided one machine per 228,000 population. North Miami General Hospital is a general hospital with 334 beds with the full range of facilities normally provided by general hospitals. It is preferred to locate CAT-Scanners in general hospitals where 24 hours per day service can be provided should the need arise. Petitioner's projected use of the machine was 1,500 procedures the first year of operation and 2,000 procedures the second year (Exhibit 1). The South Florida Health Systems Agency (HSA) initially projected scanner demand on institutional usage showing the sum of nuclear brain scans, cerebral angiograms and pneumoencephalograms performed is at least 1,000. This requirement was based on the rationale that an institution performing 1,000 of these three head procedures can expect to generate some 1,900 total head and body scans each year (Exhibit 8). A survey of the Mt. Sinai procedures conducted before and after the installation of a CAT-Scanner cast serious doubts on the validity of these assumptions (Exhibit 8) and HSA increased the institutional procedures required for justification of need to 1,500. However community need and not institutional need is the criteria required to support an application for a certificate of need. In support of its position that the decision of HSA and HRS to recommend denial of petitioner's application for a certificate of need was arbitrary and unreasonable, petitioner called four witnesses. The first witness, a diagnostic radiologist, lives and works in Leon County. The scanner at Tallahassee Memorial Hospital is in operation 14 hours per day and in 1976 some 2,850 procedures were performed. He has never used a body scanner and is not familiar with the need for additional machines in Dade County. Petitioner's second witness was a diagnostic radiologist attached to the staff at North Miami General Hospital. He believes that CAT-Scanners should be readily available 24 hours per day in all hospitals of a size at least comparable to North Miami General. The nearest machine to North Miami General is located at Miami International Hospital and is owned by a group of physicians. He does not consider the quality of scanning procedures done at this hospital is up to the highest standards and is reluctant to send patients there. No reports of unsatisfactory procedures have been made by him. In 1976 North Miami General referred only 250 to 300 patients to other hospitals for scanning procedures. Referrals are usually made to Mt. Sinai Hospital, Palmetto General Hospital, and Miami International Hospital. One objection voiced respecting the latter is the requirement that patients pay in advance for the procedure. At North Shore Hospital a physician-owned scanner is in service. North Shore Hospital, Miami International Hospital and Parkway General Hospitals are in reasonably close proximity to North Miami General. Parkway General is across the street from Miami International and commenced operating its body scanner in January, 1977. The Executive Vice president and Executive Director of petitioner also feels his hospital needs a CAT-Scanner so one will be readily available for use by patients needing the procedure. Petitioner has entered into negotiations with St. Francis Hospital to participate in the use of their scanner, but to date have not reached a participation agreement. The scanner at St. Francis Hospital, if present, is not included with the nine machines reported to be in use or the five on order. The estimates of projected use submitted with petitioner's application he considers to be conservative. The fourth witness called by petitioner was the official of HRS who prepared the letter denying the application for certificate of need. His function is to evaluate the need for capital expenditure for projects such as CAT scanners. In evaluating the need for the requested machine here involved the number of scanners presently in use was ascertained with the usage to which they are put. To this is added the scanners for which approval has been granted and ordered as well as those on order for which certificate of need has not been requested. In reaching the decision to deny approval of this application HRS relied heavily on the evaluation made by HSA and the review council both of which recommended the application not be approved. Numerous criteria, including the number of additional machines approved and on order for installation in Dade County, were considered by HRS, literature on the subject was reviewed, usage data of existing machines was obtained, discussions were held with doctors utilizing the procedure and a minimum reasonable usage of 200 scans per month, or 2,400 scans per year, per machine was established as the crucible upon which applications for additional certificates of need would be tested. Using these criteria HRS followed the recommendation of HSA. Determination of need was predicated upon the criteria contained in 42 CFR 51.4. In relating those criteria to this application HRS considered the service area appurtenant to applicant and on the date denial letter (Exhibit 6) was forwarded to petitioner three facilities in this service area, viz Mt. Sinai, Miami International, and North Shore General Hospital were equipped with CAT-Scanners and Parkway General had an application approved with installation pending. Community need, rather than the institutional need criteria developed by HSA was utilized. The primary basis for HRS' denial of the application was two CAT- Scanners in the vicinity of North Miami General were not being utilized at or reasonably near the minimum determined usage of 2,400 procedures per year and an additional scanner had been approved for installation at Parkway General. Respondent presented two witnesses, the senior health planner for HSA and the official in charge of issuing state certificates of need for HRS. In making the recommendation to disapprove the application here involved HSA considered the number of scanners installed and approved in Dade County plus those on order and the current utilization of the scanners in Dade County. Also considered was the nationwide usage data and number of scanners contained in the office of Technical Assessment draft report prepared at the request of the U. S. Senate (Exhibit 16). The procedure used to ascertain the minimum usage requirement of 2,400 procedures per year was to discuss with the doctors operating "CAT" Scanner the operation of the scanner at the hospitals using them to determine the average number of scans performed, then review the literature extant on the subject to obtain cost/usage figures throughout the U.S.

USC (2) 42 CFR 10042 CFR 51.4