CONSTRUCTION INDUSTRY LICENSING BOARD vs. RUBEN S. ARES, 83-003402 (1983)
Division of Administrative Hearings, Florida Number: 83-003402 Latest Update: Dec. 04, 1990

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: At all times relevant to this proceeding, respondent Ruben S. Ares was a certified general contractor in the State of Florida holding license number CG CO 14769. Sentinel Building Company of Central Florida, Inc. was engaged in the business of building residential homes for sale. It was the practice of Sentinel Building to buy the land, engage the services of a general contractor to obtain a building permit and help in the supervision and consultation on construction and sell the hones built to others. The contractors were paid a fee of between $250 and $500 per residence for obtaining permits and providing consultation and services. The Vice-President of Sentinel Building was responsible for hiring and paying subcontractors and suppliers. Sentinel Building was not a Florida licensed general contractor, nor was it qualified by respondent or other Florida registered or certified licensee to engage in the business or contracting in Florida. Respondent Ares was not an officer, stockholder, member of the board of directors or employee of Sentinel Building Company. In 1980, respondent entered into an agreement with Sentinel Building to act as the general contractor for the con- struction of at least four residences. His responsibilities were to supervise the construction of the hones and obtain all necessary permits, including the original building permit and the final certificate of occupancy. The responsibility for engaging subcontractors and ordering and purchasing materials and supplies remained with Sentinel Building Company. Respondent was paid a fixed fee of $350 per house. During the period of time in which four residences in Seminole County were constructed, respondent held another full time job with a building company for which he worked 43 to 44 hours per week. His activity with Sentinel Building consisted of obtaining permits and periodic checks on the construction work. According to respondent, his inspections on construction activity occurred once every three to ten days and consumed approximately too to four hours of respondent's time per week. In 1980 and 1981, respondent applied for and obtained building permits for four single-family residences in Delmar Estates, Seminole County. The applications and permits listed Sentinel Building as the owner of the property and respondent Ruben S. Ares as the contractor. At least one of the four homes was under a contract of sale prior to construction. Three of the four purchasers were under the impression that the homes were built by Sentinel Building. None of the three had ever met respondent Ares, nor were they aware that he was the general contractor.

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that respondent be found guilty of violating Section 489.129(1)(e) and (f), Florida Statutes, that an administrative fine in the amount of $1500 be imposed against respondent and that the remaining charges of the Administrative Complaint be dismissed. Respectfully submitted and entered this 22nd day of June, 1984, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of June, 1984. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Aldo Icardi, Esquire P.O. Box 879 990 Lewis Drive Winter Park, Florida 32790 James Linnan Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202

Florida Laws (4) 489.113489.119489.128489.129
# 2
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, BUILDING CODE ADMINISTRATORS AND INSPECTORS vs ROBERT KEGAN, 08-002108PL (2008)
Division of Administrative Hearings, Florida Filed:Tavares, Florida Apr. 28, 2008 Number: 08-002108PL Latest Update: Mar. 05, 2009

The Issue The issue is whether Respondent Robert Kegan (Mr. Kegan) committed violations of Chapters 455 and 468, Florida Statutes, as alleged in an Administrative Complaint filed by Petitioner Department of Business and Professional Regulation (Department).

Findings Of Fact Mr. Kegan has a Certificate of Licensure from the Florida Building Code Administrators and Inspectors Board. He was first licensed in 1994, and, unless he renewed it, the license expired on November 30, 2008. At all times pertinent, he was the Building Code Administrator in Mt. Dora, Florida. Mr. Kegan has never been employed by the City of Leesburg in any capacity. The Department is the state agency charged with regulating the practice of building code administration and inspections pursuant to Section 20.165 and Chapters 455 and 468, Florida Statutes. Linda Renn purchased a home located at 2407 Winona Avenue, Leesburg, Florida, from Mr. Kegan and his wife pursuant to a contract entered into during March 2001. Prior to entering into the contract for sale, Ms. Renn walked through the house with Mr. Kegan. Ms. Renn was aware that it was an older home and testified, "And I felt very comfortable after leaving the home and doing the walk through that even though I was buying an older home with older home obsolescent issues types, but that the renovations were enough that I felt comfortable." Ms. Renn typed up an addendum to the contract prior to execution that stated Mr. Kegan would level a part of the house that required leveling, install an HVAC, install a 220-volt outlet for the clothes dryer, and would accomplish certain other improvements prior to closing on the home. The addendum became part of the contract for sale. Mr. Kegan provided Ms. Renn with his business card indicating that he was the Building Code Administrator in Mt. Dora. Ms. Renn observed Mr. Kegan in a shirt with the Mt. Dora logo upon it, indicating that he was a building official of Mr. Dora, and she visited him in his office in Mt. Dora. There is no question Ms. Renn was aware that he was a building official in Mt. Dora. Ms. Renn claimed that because he was a building official she completely relied on the representations he made to her. However, this assertion lacks credibility because she employed an independent home inspector prior to closing. During the walk-through, the HVAC was resting upon the floor of the home's garage. However, at a time between March 17 and April 29, 2001, Mr. Kegan had the HVAC installed, as he agreed. Subsequently, Ms. Renn discovered this work was accomplished by an unlicensed individual. An inspection of the premises was conducted by Guy Medlock of Benchmark Building Inspections, Inc., on March 29, 2001. A report was issued on March 30, 2001. The report noted that the dwelling was 53 years old and had problems that one would expect from a home that old. Mr. Medlock also noted that the house had a lot of charm. Mr. Medlock's inspection noted that the dwelling required roof repairs and wood rot repairs. It was noted that it was necessary to ameliorate water leaks and correct electrical deficiencies, among other items. There were seven items noted with estimated costs of repair ranging from $50.00 to $150.00. At the time of the inspection, the 220-volt receptacle had not been installed for the washer and dryer. Mr. Medlock further noted that there was no plumbing available for the washer. Because of Mr. Medlock's report, Ms. Renn was well aware of the defects he noted, and she knew this prior to closing. The report stated that he, Mr. Medlock, had discussed the electrical deficiencies with Ms. Renn and suggested that she have an electrician inspect the dwelling. Ms. Renn testified that she gave greater weight to Mr. Kegan's knowledge than to the home inspector that she hired, but there is no basis in the record for her to arrive at that conclusion. On April 29, 2001, the day before closing, Economy Electric of Eustis, Florida, installed a 220-volt line, and Mr. Kegan paid for this work. Economy Electric's principal is Larry New. He is licensed to accomplish electrical work. He performed additional electrical work that was paid for by Ms. Renn, including upgrading wires so that her computer would not be damaged by bad wiring. On April 30, 2001, Mr. and Mrs. Kegan conveyed the premises to Ms. Renn by warranty deed. Subsequently, Ms. Renn concluded that she was not happy with certain facets of the house, and tried to contact Mr. Kegan to have her perceived problems corrected. Mr. Kegan was difficult to contact. In a letter dated November 4, 2001, Ms. Renn filed a 16-page complaint with the Department alleging numerous Florida Building Code violations by Mr. Kegan. She requested that the Department investigate these alleged violations. Sometime immediately prior to January 10, 2002, Ms. Renn had Raymond Anderson of Suter Air Conditioning, Inc., of Leesburg, inspect the HVAC. He made Ms. Renn aware of several city code infractions involving the HVAC. Sometime immediately prior to January 11, 2002, Ms. Renn had someone named James A. Dolan inspect the electrical service at the premises. In a letter dated January 11, 2002, Mr. Dolan stated that there were "national electrical code violations" at the house and that it was his opinion that an electrical inspector or building code official should look into the situation. Ms. Renn believed this to be true. Sometime immediately prior to February 5, 2002, Ms. Renn had the electrical service inspected by Bronson Electric Service, Inc., of Eustis, Florida. In a letter dated February 5, 2002, David E. Bronson reported numerous electrical deficiencies, including an improperly fused air conditioning unit. Mr. Bronson found that the electrical service to the house required an upgrade to 150 amps because the current service was inadequate. He quoted a price of $1,546.00 to accomplish the required modifications. Ms. Renn believed this to be accurate. Ms. Renn employed an inspector from Ocala, Florida, who prepared an inspection report dated May 10, 2002. She learned there were plumbing, electrical, and mechanical problems. She also learned that the roof did not meet building code standards. She noted that for a period of two and one-half years, the HVAC neither cooled nor heated, although it did make some noise. Permits were required for the electrical upgrade and for the air conditioning installation in Ms. Renn's house. No permits were obtained by Mr. Kegan, or his friends, or persons he employed to work on Ms. Renn's house, as were required by the City of Leesburg. By April 18, 2002, all permits had been obtained. Unlicensed persons worked on both the HVAC installation and the electrical upgrade. Work of that sort is lawful only if accomplished by licensed persons. The work accomplished without the appropriate permit and the work done by unlicensed persons, was done under the control of Mr. Kegan. Ultimately, Larry New, a licensed electrician, and Jimmy Harris, a licensed person, fixed all of the problems; got the work inspected; and ensured that all permits were in place. After her complaint to the Department which was drafted November 4, 2001, and submitted in early 2002, Ms. Renn was informed by the Department that she should handle the case locally. Complaints were made by Ms. Renn to the Leesburg Building Department and to many other officials of the Leesburg municipal government. Ultimately, a hearing regarding Mr. Kegan was held before the Lake County Board of Building Examiners (County Board) on August 7, 2003, in Tavares, the county seat of Lake County. Both Leesburg and Mt. Dora are in Lake County. The County Board heard charges against Mr. Kegan's contractor's license for accomplishing work in the trades of roofing, electrical, mechanical, and plumbing using unlicensed workers and failing to obtain permits. It imposed sanctions, including a $1,000 fine. The County Board required Mr. Kegan to do the work he promised, but it was clear that he had already accomplished that work, except for some roofing issues not further identified. The County Board did not address his position as the Building Code Administrator in Mt. Dora, Florida. The action of the County Board was subsequently reversed by a circuit court. Relations between Ms. Renn and Mr. Kegan eventually deteriorated to the point where Ms. Renn had a trespass warning served on Mr. Kegan and sought to have the state attorney prosecute him for trespass. She was not successful in this. She also sued Mr. Kegan civilly, but eventually she voluntarily dismissed the case. None of the actions taken by Ms. Renn, resulted in Mr. Kegan being disciplined. At some point thereafter, Ms. Renn appeared to be satisfied with her house and the retaliation she had visited upon Mr. Kegan. However, while Ms. Renn was "working on legislation" in Tallahassee, Florida, in 2006, she was asked by a Department attorney to reopen the case. Other than the transcript from the County Board hearing of August 7, 2003, nothing had changed. Every problem she had with the house that should have been ameliorated, had been ameliorated. Nevertheless, she did as asked by the Department attorney, and this case was filed. Ms. Renn sent two letters dated April 3, 2006, and one letter dated April 21, 2006, to the Chief Professions Attorney of the Department. The latter missive was a follow-up to the April 3, 2006, communications. The April 3, 2006, communications are considered complaints as contemplated by Subsection 468.619(4), Florida Statutes (2005). There is no evidence of record that Mr. Kegan was informed of the complaint or that he was permitted 30 days to respond as contemplated by Subsection 468.619(4)(b), Florida Statutes (2005). There is no evidence of record that the Department submitted the complaint regarding Mr. Kegan to a probable cause panel for review as contemplated by Subsection 468.619(4)(b), Florida Statutes (2005), within 180 days. There is no evidence to the contrary, either. In summary, the Department has proven that Mr. Kegan, during 2001 and 2002, caused work to be accomplished at 2407 Winona Avenue, Leesburg, Florida, when he owned the house, as well as after he sold the house to Ms. Renn, and this work was done without proper permits and, on occasion, by persons who had no license when a license was required.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Business and Professional Regulation dismiss the Administrative Complaint in the case of Robert Kegan. DONE AND ENTERED this 13th day of January, 2009, in Tallahassee, Leon County, Florida. S HARRY L. HOOPER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of January, 2009. COPIES FURNISHED: Harry T. Hackney, Esquire Harry Thomas Hackney, P.A. 3900 Lake Center Drive, Suite A1 Mount Dora, Florida 32757 Elizabeth F. Duffy, Esquire Charles Tunnicliff, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Ned Luczynski, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Robyn Barineau, Executive Director Building Code Administrators and Inspectors Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (9) 120.5720.165455.225455.227468.603468.604468.607468.619468.621
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID R. KNIGHT, 84-003836 (1984)
Division of Administrative Hearings, Florida Number: 84-003836 Latest Update: Jan. 09, 1986

Findings Of Fact At all times material to these proceedings, the Respondent, David R. Knight, held a registered general contractor's license numbered RG 007907 issued by the State of Florida, Department of Professional Regulation, Construction Industry Licensing Board initially in July, 1968. Respondent's license is presently in an inactive status for failure to renew but renewal can be accomplished by Respondent paying the required renewal fee only. On May 13, 1983, Respondent contracted with Joseph Cobb to remodel a house in Milton, Florida. The contract price was $23,800.00. The Respondent began the remodeling and when the project was approximately 50 percent completed, left the site. Joseph Cobb, on numerous occasions, offered to work with the Respondent in any way to finish the project, but the Respondent failed to return. Joseph Cobb paid Respondent $19,100.00 from May 14, 1983 through June 23, 1983. In addition, although the contract required Respondent to pay for all supplies and materials, Cobb paid $2,300.98 for supplies and material used in the remodeling. Respondent failed to pay Gary Rich Plumbing for the plumbing work done on the Cobb residence. Joseph Cobb was forced to pay Gary Rich $1,200.00 in order to avoid a lien being filed on his home. Respondent was not licensed to contract in Milton, Santa Rosa County, Florida, when he contracted with Joseph Cobb to perform remodeling. In June, 1982, Respondent contracted with Pearlie Rutledge to remodel a house at 608 North D Street, Pensacola, Florida, Escambia County. The contract price was $17,000.00. The Respondent began the construction without obtaining a building permit which is in violation of Section 106 Standard Building Code as adopted by the City of Pensacola Ordinance 81-83. Respondent deliberately and in a hurry left the site of construction when the building inspector appeared on the job. The Respondent was not licensed in Escambia County or the City of Pensacola to practice contracting. Pearlie Rutledge paid Respondent $5,000.00 which the Respondent failed to return when the remodeling was stopped by Charles Humphreys, Housing Inspector for the City of Pensacola. Pearlie Rutledge obtained a Final Judgement against the Respondent for $4,557.00 which has not been paid by the Respondent. Respondent's "81-82' and "82-83", Okaloosa County Occupational License was issued to David Knight doing business as "Your Way Construction." However, there was no evidence presented at the hearing that Respondent ever contracted in the name of "Your Way Construction." In fact there is evidence that during the year 1983 he contracted with Cobb as David Knight, General Contractor and not as David Knight, General Contractor, d/b/a Your Way Construction. (See Petitioner's Exhibit No. 1.)

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the Board enter a final order Dismissing Counts II, V and VI of the Administrative Complaint filed against the Respondent. It is further RECOMMENDED that the Board enter a final order finding Respondents guilty of the violation charged in Counts I, III and IV of the Administrative Complaint filed against the Respondent and for such violation it is RECOMMENDED that the Board revoke the Respondent's registered general contractor's license numbered RG 0007907, to practice contracting in the State of Florida Respectfully submitted and entered this 9th day of January, 1986, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 9th day of January, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-3836 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the Petitioner to this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Adopted in Finding of Fact 1. Exhibit 1). 3. Adopted in Finding of Fact 3. 4. Adopted in Finding of Fact 4. 5. Adopted in Finding of Fact 5. 6. Adopted in Finding of Fact 6. 7. Adopted in Finding of Fact 7. 8. Adopted in Finding of Fact 8. 9. Adopted in Finding of Fact 9. 10. Adopted in Finding of Fact 10. 11. Adopted in Finding of Fact 11. 12. Adopted in Finding of Fact 12. Adopted in Finding of Fact 2 except for contract amount which should have been $23,800. (See Petitioner's Respondent Did Not Submit Any Proposed Findings of Fact COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Post Office Box 2 Jacksonville, Florida 32202 Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee Florida 32301 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. David R. Knight 1215 East Hayes Street Pensacola, Florida 32503

Florida Laws (4) 120.57489.117489.119489.129
# 4
WILLIAM R. MULDROW vs DEPARTMENT OF COMMUNITY AFFAIRS, DIVISION OF HOUSING AND COMMUNITY DEVELOPMENT AND THE FLORIDA BUILDING COMMISSION, 07-005126RU (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Nov. 09, 2007 Number: 07-005126RU Latest Update: Jul. 01, 2008

The Issue Whether Summary Final Order should be granted and, if so, whether Florida Administrative Code Rule 9B-3.475 is an invalid exercise of delegated legislative authority.

Findings Of Fact Petitioner is the owner of a construction company that constructs roof-overs in the Leon County area. A roof-over is a construction method where an existing roof is covered over with an additional layer of roofing material without removing the old roof. The construction method is specifically authorized by section 1510, Florida Building Code, Building Volume (2004 as amended 07/2007), and Section 511, Florida Building Code, Residential Volume (2004 as amended 07/2007). Roof-overs are not considered roof replacements; roof-overs are considered a form of reroofing. As indicated, amended Florida Administrative Code Rule 9B-3.0475 was effective on April 6, 2008. The rule adopted, by reference, the Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures (the Manual). In general, Section 101 of the Manual provides the requirements for mitigation as prescribed by law. Section 201.2 provides permissible techniques for accomplishing the requirements defined by Section 101. The Manual is not part of the Florida Building Code. Section 101 of the Manual provides: Retrofits Required. Pursuant to Section 553.844, Florida Statutes, strengthening of existing site-built, single family residential structures to resist hurricanes shall be provided. Site built single-family residential structures shall mean site built family detached residential structures. 101.1 When a roof on an existing site-built, single family residential structure is replaced, the following procedures shall be permitted to be performed by the roofing contractor: (emphasis supplied) Roof-decking attachment and fasteners shall be strengthened and corrected as required by section 201.1. A secondary water barrier shall be provided as required by section 201.2. Section 201.2 of the Manual provides the methods for installation of a secondary water barrier when an existing residence is subject to work that includes a “reroof.” The term “reroof” is not defined within the Manual. The authority for Florida Administrative Code Rule 9B- 3.0475 is Section 553.844, Florida Statutes. Section 553.844(3)(a) states: A roof replacement must incorporate the techniques specified in subparagraphs (2)(b) 2 and 4. (emphasis supplied) Subparagraph (2)(b)2 states: Secondary water barriers for roofs and standards relating to secondary water barrier. The criteria may include, but not limited to. . . . Chapter 2 of the Florida Building Code, defines reroofing, for purposes of the Florida Building Code, to include roof replacement and roof-overs. However, the Florida Building Code definition of reroofing is not determinative of the meaning of the term reroof in the Manual since the Manual is not part of the Florida Building Code. Testimony demonstrated that Leon County’s Building Inspector recognized the fact that the mitigation manual was not meant to apply to roof-overs because application of the requirement for a secondary water barrier requires removal of an existing roof covering and is inconsistent with the practice of roof-overs. Additionally, the Respondents do not intend the requirement for secondary water barriers to apply to roof-overs and have stipulated to that interpretation in this hearing. While the Manual could have been more precise in the use of the terms roof replacement and reroofing, it is clear that, when read as a whole, the Manual only addresses roof replacement and does not apply to roof-overs. Such a requirement is within the Respondents’ statutory authority.

Florida Laws (3) 120.52120.56553.844 Florida Administrative Code (1) 9B-3.0475
# 5
FLORIDA BOARD OF PROFESSIONAL ENGINEERS vs LAWRENCE BENNETT, P.E., 09-005542PL (2009)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Oct. 12, 2009 Number: 09-005542PL Latest Update: Jun. 17, 2024
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHN M. SNEED, 82-002398 (1982)
Division of Administrative Hearings, Florida Number: 82-002398 Latest Update: Dec. 04, 1990

Findings Of Fact At all times material to this proceeding, Respondent was a registered roofing contractor, having been issued License No. RC0034672, in the name of John M. Sneed, Beall and Associates Roofing Corp., 7650 Southwest 135th Street, Miami, Florida 33156. Sometime during the month of October, 1951, Jerry Stamos entered into an oral agreement with Bill Parry and Billy Duncan, to have Parry and Duncan reroof Stamos's home at 441 Castonia Avenue, Coral Gables, Florida. The contract price for the reroofing work was $4,000. At no time was either Duncan or Parry licensed to perform roofing work. As a result, after Mr. Stamos was unable to obtain a building permit in his own name to perform the work, Duncan contacted Respondent, and requested that Respondent pull the building permit for the job. On October 20, 1981, Respondent obtained City of Coral Gables, Department of Building and Zoning Permit No. A48375 to perform the work on the Stamos's property. At the time the building permit was pulled by Respondent, no work had commenced on the job. Duncan and Parry were paid a total of $4,000 for the job, $100 in cash; $2,000 on October 13, 1981; and an additional $1,900 on October 22, 1981. Shortly after the building permit was pulled and work had been commenced on the property by Duncan and Parry, Duncan and Parry stopped work on the roof and never returned. Respondent was on the job site on at least one occasion when work was being performed. No notice was furnished to Mr. Stamos concerning cessation of work on the project, nor was he ever given an explanation of why work stopped and was never recommenced by Parry, Duncan, or Respondent. Respondent never supervised any of the work performed by Parry or Duncan, nor did he ever call for any inspection of the project by the City of Coral Gables, Department of Building and Zoning. The South Florida Building Code, Section 3401.1(b) provides as follows: INSPECTION. The Building Officials shall be notified by the permit holder and ample time for mandatory inspections to be made as follows: At the time the anchor sheet is being mopped to non-nailable decks. At the completion of mechanically fastening the anchor sheet to nailable decks and before mopping. During the operation of shingling or tiling. Upon completion of the roof covering. On December 1, 1981, Respondent contacted the City of Coral Gables, Department of Building and Zoning, and cancelled the permit previously obtained by him on October 20, 1981. At that time, Respondent represented to city officials that construction had never started on the project, although he knew that representation to he false. The building project remained unfinished for a period in excess of ninety days before Mr. Stamos had the job finished by another contractor.

Florida Laws (4) 120.57455.227489.119489.129
# 8
FLORIDA ENGINEERS MANAGEMENT CORPORATION vs LAWRENCE L. GEORGE, P.E., 04-003224PL (2004)
Division of Administrative Hearings, Florida Filed:Lakeland, Florida Sep. 14, 2004 Number: 04-003224PL Latest Update: Apr. 19, 2005

The Issue Whether disciplinary action should be taken against Respondent's license as a professional engineer as a result of violations of Section 471.023 and Subsection 471.033(1)(g), Florida Statutes (2004), as alleged in the Administrative Complaint.

Findings Of Fact At all times material to the allegations in the Administrative Complaint, Respondent, Lawrence L. George, P.E., was a licensed professional engineer in the State of Florida, License No. PE21282. Florida Engineer Management Corporation is charged with the duty of providing administrative, investigative, and professional services to the Board of Professional Engineers (Board). The Board is charged with regulating the practice of engineering in Florida. On or about June 7, 2002, Respondent began to provide engineering services to Atlantic, a manufacturer of window and door units with glass encased in polyvinyl chloride frames, through the auspices of Highlands. Highlands did not have a certificate of authorization until October 20, 2003. Respondent provided to Atlantic a signed and sealed letter dated June 24, 2002, certifying that the Royal A-135 vinyl windows using laminated glass (two and one-eighth inch glass layers with one-eighth inch laminate) met the requirements of the 2001 Florida Building Code (the Code). Respondent's June 24, 2002, letter certified that the windows met the large missile/small missile impact requirements of the Code. The June 24, 2002, letter, certifying that the windows met the large missile/small missile impact requirements of the Code, as submitted, supported the conclusion that insulating glass windows manufactured by Atlantic complied with the Code. Royal A-135 windows made by Atlantic are insulating glass windows. Insulating glass has two or more layers of glass separated by air spaces. Test data submitted for Royal A-135 insulating glass windows does not meet the missile impact test of the Code. Section 1606.1.4 of the Code and the tests referenced therein require testing of entire window assemblies to comply with the large missile/small missile impact tests. The Royal A-135 insulating glass windows manufactured by Atlantic were not tested as required by the Code. At the final hearing, Respondent admitted that his engineering analysis in lieu of testing did not meet the requirements of the Code. The June 24, 2002, letter was also submitted to the City of Dunedin Building Department as a representation that the Royal A-135 windows made by Atlantic met the Code as far as missile impact tests. The wind load analyses provided by Respondent to Atlantic were required to be filed with the building department of the City of Dunedin in order to get construction permits. Pursuant to the Code, the City of Dunedin is wholly within an area designated a wind-borne debris region. On or about July 27, 2002, Respondent sent to Atlantic a signed and sealed letter that confirmed that a mullion detail satisfied the Code requirements in wind zones up to 140 mph wind speeds. On or about August 3, 2002, Respondent signed and sealed a drawing on Atlantic stationery of a mullion detail. The mullion detail is for a structural element between individual window assemblies. It forms a connection extending the length of the windows. The mullions designed by Respondent were not tested to determine compliance with the Code. On or about August 3, 2002, Respondent also provided to Atlantic a signed and sealed wind load analysis for the installation of replacement windows for a seventh floor apartment located at Nine Forbes Place, Dunedin, Florida (Forbes Place). On or about January 16, 2003, Respondent provided to Atlantic a signed and sealed wind load analysis for the installation of replacement windows for a second-story apartment in a multi-story building located at 634 Edgewater Drive, Dunedin, Florida (Edgewater Drive). On or about June 10, 2003, Respondent provided to Atlantic a signed and sealed wind load analysis for the installation of 150 replacement windows for a two-story apartment complex, Victoria Apartments at 1101 Victoria Drive, Dunedin, Florida (Victoria Apartments). On or about January 6, 2004, Respondent submitted to the Florida Department of Community Affairs (DCA) a validation that the windows described in paragraph five complied with the Code. This validation was for the purpose of establishing the windows as "approved products," or standards, published on the Florida Building Code Information Systems' website for design professionals. Respondent submitted test results to the DCA for laminated glass windows manufactured by other companies, but those tests do not support the conclusion that insulated glass windows made by Atlantic would pass the missile impact tests. Respondent never provided test results for laminated glass windows made by Atlantic. Respondent did not provide an engineering design to show that the mullion would be directly connected to the substrate supporting the window. Respondent did not provide an engineering analysis to address deflection of the mullion under design pressure loads. A mullion of the type certified in the July 27, 2002, letter was used in the Victoria Apartments. Respondent designed the mullions to be constructed on-site at the Victoria Apartments as the windows were installed. The annealed glass insulating replacement windows for Victoria Apartments were not impact resistant. The Victoria Apartments with the Atlantic replacement windows are partially enclosed structures within the meaning of the Code. Respondent did not provide calculations in the wind load analysis for Victoria Apartments to show that the structural elements of the apartments could resist design load for a partially enclosed building after replacement of all the windows. It is not necessary to determine whether the mullions used at Victoria Apartments were integral parts of the units or connectors that had to be directly attached to the substrate. If the windows used integral mullions, they were not tested as required by the Code; if the windows employed mullions that were not integral, they were not engineered as required by the Code. Wind load calculations for Forbes Place used one-third increase in allowable stress to the structure and assemblies, which is contrary to the Code. Wind load calculations for Forbes Place did not take into account the height of the building. Wind load calculations for the Edgewater Drive project used an improper importance factor of 0.77. Use of an importance factor of 0.77 was a misinterpretation of the Code. Wind load calculations for Edgewater Drive did not take into account the height of the building. Respondent did submit an application for product approval to the Florida Building Code Information System for Royal A-135 windows on or about January 6, 2004. The application for product approval included Respondent's letter of June 24, 2002. The product approval system is a vehicle by which manufacturers can get statewide approval for products through a website operated by the Florida Building Commission. Beginning in 2003, manufacturers could submit documentation for particular products through the website. When the manufacturer submits its documentation, it may also present a validation through the website, such as the one Respondent presented in Exhibit P4. After a product has been validated, the submission may be forwarded to the Florida Building Commission for approval, but the fact the validation appears on the website does not mean it has been approved. Approval by the Florida Building Commission is limited to whether required documents have been properly filed; it does not mean that the documents submitted by the validating engineer contain technically correct information. Technical information and analysis is not reviewed by the Florida Building Commission. The Board is the only entity currently charged with the responsibility to investigate whether a validating engineer has provided accurate engineering in a submission to the product approval system. Respondent's June 24, 2002, letter is confusing and misleading in its references to both insulating and laminated glass. Respondent had difficulty navigating the Florida Building Code Information System website and repeatedly submitted an application for product approval to authorities. Respondent continued to enclose the June 24, 2002, letter with the application to represent that insulating glass windows comply with the missile impact requirements of the Code. Continued use of the letter in his application process manifests continuing negligence or incompetence by Respondent. However, Respondent, later in 2004, adopted procedures for submittal to local building departments that would better explain his wind load calculations.

Recommendation Based on the foregoing Findings and Fact and Conclusions of Law, it is RECOMMENDED that the Board of Professional Engineering adopt the foregoing Findings of Fact and Conclusions of Law and enter a final order imposing a penalty of: a reprimand; six months' suspension, followed by five years' probation; and an administrative fine of $12,000, plus the costs of these proceedings. DONE AND ENTERED this 21st day of December, 2004, in Tallahassee, Leon County, Florida. S DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of December, 2004. COPIES FURNISHED: Bruce A. Campbell, Esquire Florida Engineers Management Corporation 2507 Callaway Road, Suite 200 Tallahassee, Florida 32303-5267 Lawrence L. George, P.E. 5920 Winewood Drive Lakeland, Florida 33813 Teresa Baker, Clerk Florida Engineers Management Corporation 2507 Callaway Road, Suite 200 Tallahassee, Florida 32303-5267 Doug Sunshine, Esquire Vice President for Legal Affairs Florida Engineers Management Corporation 2507 Callaway Road, Suite 200 Tallahassee, Florida 32303-5267 Leon Biegalski, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Natalie A. Lowe, Executive Director Board of Professional Engineers Department of Business and Professional Regulation 2507 Callaway Road, Suite 200 Tallahassee, Florida 32303-5267

Florida Laws (6) 120.569120.57456.073471.023471.033471.038
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE LONGINO, 87-000162 (1987)
Division of Administrative Hearings, Florida Number: 87-000162 Latest Update: Aug. 11, 1987

Findings Of Fact Findings of Fact 1-13 are made based upon the Stipulation of the parties filed on July 10, 1987. Respondent is, and was at all times material to the pending amended administrative complaint, a certified building contractor having been issued license number CB CAO9793 by the Florida Construction Industry Licensing Board. At all times material the pending amended administrative complaint Respondent's certified building contractor license (CB CAO9793) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending amended administrative complaint, a certified air conditioning contractor having been issued license number CA CO24348 by the Florida Construction Industry Licensing Board. At all times material to the pending amended administrative complaint, Respondent's certified air conditioning contractor license (CA CO24348) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending administrative complaint, a registered mechanical contractor having been issued license number PM 0031246 by the Florida Construction Industry Licensing Board. At all times material to the pending administrative complaint, Respondent's mechanical contractor license qualified "J. C. and Sons, Inc." with the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was Respondent the qualifying agent for "First City Contractors, Inc." as defined by Sections 489.105(4) and 489.119, Florida Statutes. At no time material to the pending amended administrative complaint was Charles L. Crowe registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was "First City Contractor's, Inc." registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. On or about January 23, 1986, Charles L. Crowe d/b/a First City Contractors, Inc., contracted with Steve Bell to construct a room addition at 3110 Carrevero Drive West, Jacksonville, Florida. The contract price was approximately $25,000. On or about March 10, 1986, the City of Jacksonville, Building and Zoning Inspection Division, issued building permit number 6196 to George E. Longino and Associates, Inc. The above referenced building permit was for the construction of a room addition at the residence of Steve Bell, 3110 Carrevero Drive West, Jacksonville, Florida. The following Findings of Fact are based upon the evidence introduced at formal hearing. In December, 1985, or January, 1986, Charles L. Crowe, sole owner of First City Contractors, Inc., approached Longino and asked him to become a partner in the business and to pull permits and be the qualifying agent for First City Contractors, Inc. Longino advised Crowe that he would not be interested in doing that until he had resolved certain pending problems with his licenses. Specifically, the Construction Industry Licensing Board had filed a disciplinary action against Respondent's licenses and that case had been heard and a Recommended Order entered on October 30, 1985. The Recommended Order was scheduled to be considered by the Construction Industry Licensing Board on January 9, 1986. Longino did agree to pull permits for any job on which he would be paid to supervise the construction. Longino did pull the permit and supervise the construction of a garage addition in Arlington, Jacksonville, Florida, for First City Contractors in January or February, 1986. On January 23, 1986, Charles L. Crowe, doing business as First City Contractors, Inc., entered into a contract with Steve Bell to construct a room addition to a residence located at 3110 Carrevero Drive, Jacksonville, Florida. The contract price was $25,000. Based upon the contract, Crowe asked Longino to use his license number to sign a permit application for the Bell job. Longino used a building permit application form which he had in his truck and filled in the pertinent information on the building permit application. Specifically, Longino filled in the name of the licensed contractor as "First City Contractors, Inc." and signed his name as the licensee with license number CB CA09793. Longino signed the building permit application on or about the last week of January, 1986. Financing was not secured for the Bell job until March, 1986. On March 10, 1986, Crowe used the permit application which had been previously signed by Longino and sent an employee of First City Contractors, Inc., Robert Cumpston, to secure a building permit from the City of Jacksonville for the Bell job. Specifically, permit number 6196 was issued based upon the permit application which had been previously signed by Longino. On February 19, 1986, the Construction Industry Licensing Board entered a Final Order suspending Longino's licenses. Longino received notice of the suspension on February 24, 1986, by certified mail. Longino advised Crowe that his licenses had been suspended within a few days following receipt of the Final Order. Despite the knowledge that Longino's licenses had been suspended, Crowe used the presigned building permit application to secure a building permit for the Bell job on March 10, 1986. Building permit number 6196 was issued to Longino's license number doing business as George E. Longino and Associates, Inc. The name of the business was changed from that which was stated on the building permit application because Longino was not a qualifying agent for First City Contractors, Inc. He was only a qualifying agent for George E. Longino and Associates, Inc. A permit could not be issued to First City Contractors, Inc. using Longino's license number. The Bell job was completed using permit number 6196. Longino did supervise that construction and was present at the site on a daily basis. Permit number 6196 was posted at the site. Despite Longino's statements that he did not know that the permit was issued to his license number, it is found that Longino knew or should have known that permit number 6196 was issued to his license number, doing business as George E. Longino and Associates, Inc. Longino did nothing to remedy the problem even though his licenses had been suspended.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Professional Regulation, Construction Industry Licensing Board, enter a Final Order suspending the licenses of George E. Longino for a period of one (1) year in addition to the previous suspension. DONE and ENTERED this 11th day of August, 1987, in Leon County, Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of August, 1987. COPIES FURNISHED: Van Poole, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely Executive Director Construction Industry Licensing Board Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 William Bruce Muench, Esquire 438 East Monroe Street Jacksonville, Florida 32201 =================================================================

Florida Laws (5) 120.57489.105489.119489.127489.129
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer