ELOISE COMMUNITY REDEVELOPMENT AGENCY, BRUCE BACHMAN AND JOHNNY BROOKS vs POLK COUNTY, FLORIDA, 05-000717GM (2005)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Feb. 28, 2005 Number: 05-000717GM Latest Update: Aug. 11, 2005

The Issue The issues in this case are whether the Small Scale Comprehensive Plan Amendment No. 05S-01 (the Plan Amendment) adopted by Polk County (County) through the enactment of Ordinance No. 05-004 is “in compliance,” as that term is defined by Section 163.3184(1)(b), Florida Statutes,1 and whether Petitioner, Citizens for Proper Planning, Inc. (CPPI), has standing as an “affected person” as defined by Section 163.3184(1)(a), Florida Statutes, in this proceeding.

Findings Of Fact The ECRA is a local special district governmental agency established pursuant to Chapter 163, Part III, Florida Statutes, and is composed of a seven-member board of directors. The boundaries of the Eloise Community Redevelopment Area include an area consisting of approximately 665 acres within the unincorporated Eloise area of Polk County (the Redevelopment Area). The Subject Property is located within the Redevelopment Area. See JE 8A. The ECRA meets once a month, except July, when they do not normally meet. Its purpose is to discuss and implement the ECRA Redevelopment Plan’s six objectives within the Redevelopment Area. The ECRA opposed the Plan Amendment by and through its attorney and submitted oral and written comments, recommendations, and objections to the County regarding the Plan Amendment during the Plan Amendment adoption proceedings. As a part of its presentation to the County regarding the Plan Amendment, the ECRA delivered to the County, ECRA Resolution No. R-05-01, objecting to the Plan Amendment. The parties agree that the ECRA has standing in this proceeding. Petitioner, Bruce Bachman (Mr. Bachman), resides in Winter Haven, Polk County, Florida. His residence is located outside of the Redevelopment Area and is approximately three (3) miles from the Subject Property. He is employed as the operator (since 1980) and general manager of Phoenix Industries, LLP, (Phoenix), located at 621 Snively Avenue, County Road (CR) 655 in Eloise, which is adjacent to and across the street from the Subject Property. Mr. Bachman has served as the Chairman of the Board of Directors of the ECRA since 1998. Phoenix operates a warehousing and distribution complex for dry, refrigerated, and frozen food products east of Snively Avenue and across the street from the Subject Property. The Phoenix property stretches north and south within an elongated area within the Redevelopment Area, and is open 24-hours a day, seven days a week.2 See JE 8A at "30". (The railroad, designated with a red line, runs north and south through the Phoenix property. JE 8A.) Phoenix has spent approximately $115,000 changing the angles of its buildings and moving docks so that trucks could maneuver on the property, and not have to enter Snively Avenue to do so. Mr. Bachman is involved with the Eloise residential area and the Redevelopment Area generally and his contributions to the Eloise area are well-noted in the record. His work with the community includes working with the students at Snively Elementary School. Individually, and on behalf of the ECRA, Mr. Bachman submitted oral and written comments, recommendations, and objections to the County during the Plan Amendment adoption proceedings. The parties agree that Mr. Bachman has standing in this proceeding. Petitioner, Johnny Brooks (Mr. Brooks), resides at 143 8th Street, Eloise, Polk County, Florida, approximately three (3) blocks southwest from the Subject Property. His home is located within the main residential component of the Redevelopment Area. He was born in Eloise (on 5th Street) and has lived, with his wife, at the 8th Street address for 41 years. Mr. Brooks also serves as Vice-Chairman of the Board of Directors of the ECRA. Although disabled, Mr. Brooks is an active member of the Eloise Community. For example, he and his wife conduct a “homework club” at the Eloise Community Resource Center (opened in 2002) located between 7th and 8th Streets and Snively Avenue, which is east and down the block from his residence. JE 8A at "2". They also use the computer lab at the resource center for adult education. They use the neighborhood Snively/Brooks Park, JE 8A at "4", approximately one block south of the Brooks' residence and west of the Snively Elementary School, JE 8A at "3", for, among other activities, Easter egg hunts and Christmas parties. Mr. Brooks is also involved in the Eloise Neighborhood Association, which offers adult computer classes, GED classes, and classes in English as a Second Language. He and his family use other resources within the Redevelopment Area, such as the Snively Elementary School, and a post office, JE 8A at "1", which is located approximately one block north of the Subject Property between 4th and 5th Streets, near Snively Avenue. Mr. Brooks attends the Eloise United Methodist Church (built in 1966-1967), which is located on land designated as Industrial (IND) on the FLUM. 3 JE 8A at "10". This church is located on the southwest side of Snively Avenue, and approximately five or six blocks south of the Subject Property and approximately two blocks south of the Snively Elementary School and the Snively-Brooks Park.4 Mr. Brooks submitted oral comments, recommendations, and objections to the County during the Plan Amendment adoption proceedings. The parties agree that Mr. Brooks has standing in this proceeding. CPPI is an organization comprised of approximately two hundred members, located throughout Polk County, Florida. CPPI has been an existing corporation since 2002. No application, request to join or payment of dues is currently required for membership. According to its executive chairperson, Jean Reed, its purpose is to "better plan for our growth in Polk County." Ms. Reed lives approximately one mile east of Eloise and four of five of the CPPI Board of Directors live within a mile of Eloise. All CPPI members live in the County. CPPI had been involved in County hearings and an administrative hearing involving a small scale comprehensive plan amendment. The organization currently encourages donations and plans to charge dues next year. CPPI submitted oral comments, recommendations and objections to the County during the Plan Amendment adoption proceedings. No evidence was presented to show that CPPI owns real property within the County. The County and the Intervenor dispute CPPI’s standing in this proceeding. The County is a political subdivision of the State of Florida, empowered to adopt, implement, and amend its Comprehensive Plan in accordance with the laws of Florida. Intervenor, Don C. Smith (Smith or Intervenor), owns the Subject Property. He purchased the Subject Property of 9.9 acres, which is part of a contiguous 20-acre site, in May of 2003. Mr. Smith learned that the Subject Property had an RL-4 land use designation just prior to his purchase of the Subject Property. The parties agree that Mr. Smith has standing in this proceeding. The Eloise Community Redevelopment Area The Redevelopment Area consists of approximately 665 acres. EE 2, Plan at 30. It is generally bounded by the CSX railroad to the north of US 17; by Lake Lulu and Shell Road on the east; by Snively Avenue (CR 655) on the south; and by Wahneta Canal and a portion of Wahneta farms on the west. JE 8A.5 (Snively Avenue is a four-lane undivided, major collector highway, but is not a buffer.) Both historically and presently, the Redevelopment Area has been composed of mixed uses in an urban area. Under the FLUM, there are eight separate land uses within the Redevelopment Area: Industrial (IND), Business Park Center (BPC- 2), High Impact Commercial (HIC), Institutional (INST-1), Community Activity Center (CAC), Residential Suburban (RS), Residential Low-1 (RL-1), and Residential Low-4 (RL-4). JE 8A. Beginning at the northern portion of the Redevelopment Area and moving from west to east, south of the CSX railroad and approximately one block south of US 17, the land uses designated on the FLUM are HIC, CAC, and HIC. Moving southward and east of Snively Avenue, the land use designation for a triangular portion of land is BPC-2. The land use designation adjacent to and immediately south of the BPC-2 designation and east of Snively Avenue is designated as IND. The IND designation covers the land in a southerly direction until Snively Avenue intersects with Croton Road. The land to the east and adjacent to the BPC-2 and IND designations is designated as RL-1. There is a small portion of land near Shell and Croton Roads at the southern boundary of the Redevelopment Area designated as Residential Suburban (RS). (The RS designation continues to the east outside of the Redevelopment Area. Lake Lulu is to the east of the eastern RL-1 and RS designations.) There is also land designated as RL-1 west of Snively Avenue, bisected by Unnamed Street, extending west of Wahneta Canal and south-southwest of the Snively Elementary School/Snively-Brooks Park area, to the southwestern boundary of the Redevelopment Area.6 The Snively Elementary School and the Snively-Brooks Park are located in the INST-1 land use designation.7 JE 8A. Approximately 150 children walk to and from this elementary school (with another 60 to middle and high schools outside the Redevelopment Area), utilizing the sidewalk bordering the western portion of Snively Avenue. The majority of the children attending the elementary school reside in the RL-4 designated area (mainly between 1st and 9th Streets). Mr. Smith agreed that the elementary school was in close proximity to the Subject Property. Mr. Smith testified that after meetings with the ECRA, he moved the fence in front of the Subject Property and business back ten feet so that the children could have more room to walk down the street. He also instructed his drivers of big trucks and heavy equipment not to enter the Subject Property during times when the children are going to and from school. There are several school crossings, crossing Snively Avenue. There is a bus stop at 5th Street and Snively Avenue for children attending middle and high school. JE 8A at "6". There are also bus stops on 7th Street and in front of the elementary school. JE 8A at "5" and "7". Except for the residential portions of the CAC and BPC-2 areas, the primary residential area of the Redevelopment Area is generally bounded by US 17 and 1st Street on the north, the Wahneta Canal on the west, and to just north of Snively Elementary School and 9th Street on the south. JE 8A; EE 2, Plan at 6 and Figure 2. The Eloise Community Redevelopment Area Uses 1. In General The Redevelopment Area, for at least the last 40 years, has supported a wide variety of industrial, commercial, institutional, and residential uses. Mr. Brooks and Mr. Smith testified that the Redevelopment Area has supported these mixed uses and has historically been defined by the interrelationship of these various uses with the predominant industrial activities within its boundaries. In the past, the established residential area (RL-4) was once a successful working-class neighborhood which primarily provided homes to those workers who were employed in the citrus plants located within the industrial classified areas. That residential area is now blighted and provides housing for low and moderate income families. Though well established, the RL-4 residential area contains a substantial number of vacant lots within that residential designated area. 2. Redevelopment Area Problems and Redevelopment During the early 1980’s, Eloise was a troubled community, suffering, for example, from theft and vandalism. The community had difficulty finding minority contractors willing to work at Phoenix because of the problems associated with the community. By the early 1990s, the residential area of the Redevelopment Area had deteriorated to such an extent that the Housing and Neighborhood Development Division (HND), an agency of the County, became actively involved in the redevelopment of the community. In 1992, the Eloise Neighborhood Association was formed. In 1996, a Neighborhood Revitalization/Redevelopment Plan was commissioned by HND. This plan was prepared by County staff. Also in 1996, the HND and the Eloise Neighborhood Association prepared the Eloise Neighborhood Revitalization/Redevelopment Plan, which “focused on the 138 acres generally bounded by the CSX Railroad on the east, the railroad and US 17 on the north, the Wahneta Canal on the west, to just south of the Snively Elementary School. Its recommendations included improved social services, land use changes, housing programs and infrastructure improvements.” In 1998, a Declaration of Slum and Blight was adopted by the Board through Resolutions Nos. 98-08 and 98-66, which, respectively, made a finding of blighting conditions in Eloise and adopted a redevelopment plan for Eloise. As a result, the ERCA was created pursuant to Section 163.356, Florida Statutes, to rehabilitate, conserve, and/or redevelop the Redevelopment Area. In 2000, the Board, pursuant to Section 163.360, Florida Statutes, adopted Ordinance No. 00-33, approving of the Eloise Redevelopment Plan as the Community Development Plan for the Redevelopment Area. It was the purpose and intent of the Board that the Eloise Redevelopment Plan be implemented in the Redevelopment Area. The Board made numerous findings in Ordinance No. 00- 33 including a determination that “[t]he Plan conforms to the general plan of the county as a whole” and that “[t]he Plan conforms to the Polk County Comprehensive Plan.” The Board also determined that “[t]he need for housing accommodations has increased in the area.” The Eloise Redevelopment Plan has not been adopted as part of the County's Comprehensive Plan. Thus, the Plan Amendment need not be consistent with the Eloise Redevelopment Plan to be “in compliance.” The May 2000, Eloise Redevelopment Plan describes the then existing ownership patterns such that “[t]he existing Eloise residential neighborhood between 1st and 9th Streets is subdivided into platted, fifty-foot wide lots. Most are 100-125 feet in depth. Lots along 9th Street abutting the school are platted as 70-foot wide lots. The ownership pattern in this area typically follows the lot lines. Most are individually owned lots. (See Figure 6).” EE 2, Plan at 16. Particularly relevant here, it is also stated: “Lots 33 and 34 [part of the Subject Property] are each approximately 9 acres and are owned by Alterman Transport Corporation (ATC). The site is currently used for storage and, in the past, was zoned GI [General Industrial] and R-3. In the current Comprehensive Plan, however, this site is planned for Residential Suburban (RS) to be compatible with the surrounding neighborhood. The trucks are a legal-nonconforming use and may continue but any future development shall comply with the RS land use district.” EE 2, Plan at 16. The Eloise Redevelopment Plan also recommended that the Alterman Trucking Annex, also known as the Alterman Transportation Corporation, be developed for up to 75 single- family homes by the end of 2004. EE 2, Plan at 32; JE 3 at 3 of (The Subject Property was also formerly known as the Alterman Motor Freight Terminal. JE 2, 8/10/2004 site map.) In 2001, the County also changed the classification of the Subject Property from RS to RL-4 pursuant to Ordinance No. 01-45. See Finding of Fact 54. In addition to the creation of the ECRA, the County, through the HND, has attempted to revitalize the Redevelopment Area. Since 1993, HND has spent approximately $4.4 million dollars in these efforts. These funds have been spent on community policing ($424,790), slum and blight clearing ($47,428), housing rehabilitation ($186,807), parks and recreation ($149,982), water/sewer/drainage ($1,094,677), construction of the Eloise Community Center ($2,147,037), replacement of five homes ($314,138), and rehabilitation and repair of five homes ($46,819). As part of the Eloise Redevelopment Plan, many additional infrastructure improvements have been proposed, such as fire hydrants, turnaround areas for emergency vehicles and fire trucks, storm water installation, and sewer for the Residential Area of Eloise between 1st and 9th Streets and between Snively Avenue and the canal. The proposed projects for water, sewer, and storm water include 350 parcels to be served in this Residential Area. The construction of the Eloise Community Center has been the most costly expense in these efforts. After the County obtained this parcel from Phoenix Industries, it was discovered that the land was contaminated and more than $400,000 was spent on environmental clean-up costs for this property. The ECRA and the County have made progress in the area of code enforcement. Furthermore, crime has been cut in half and a drinking ordinance was passed by the County upon request of the ECRA and the Eloise Neighborhood Association. Eloise, with the County's cooperation, also initiated a Community- Oriented Policing program. There has been an increase in construction in the area, both on the residential and commercial/industrial side of Snively Avenue. The ECRA has also been working on a beautification strategy. For example, Phoenix spent $35,000 for landscaping, removing barbed wire, installing an irrigation system, and installing an attractive entrance to its facilities. Further beautification is planned for other areas along Snively Avenue, the main gateway to the area from US 17, and improvements to Snively Elementary School, for which the ECRA allocated up to $10,000. Currently, the socio-economic status of the families living within the residential portion of the Redevelopment Area is low and moderate income. But, as noted above, the area is being revitalized, including the addition of several Habitat for Humanity-built homes. Mr. Bachman confirmed that "[t]hings have changed now," including the employment of minorities and an increase in diversity at the elementary school. The Subject Property The Subject Property is located within the Redevelopment Area on the southwest side of Snively Avenue between 5th and 6th Streets. JE 8A. The Subject Property consists of approximately 9.9 acres, which is part of a 20-acre parcel owned by Mr. Smith. Tr. 261. (There is a vacant parcel not subject to the Plan Amendment, also acquired by Mr. Smith at the same time, adjacent to and west of the Subject Property, which appears to be within a flood zone area. JE 8A at “46”. The canal serves as the western border for this parcel.) Currently, there are ten to eleven residences along 5th Street, north of the Subject Property, and ten residences between the Subject Property and 6th Street, south of the Subject Property. See EE 7. There does not appear to be any appreciable distance between these residences and the Subject Property. Aside from the residential homes north and south of the Subject Property, there are also retail, auto repair, and other commercial uses which border on Snively Avenue. See, e.g., IE 1, aerial with 15 photographs; JE 3 at 5 of 27; Tr. 295-297; JE 8A. According to Mr. Smith, he requested the land use designation change to cure the non-conforming status of the Subject Property. All operations on the Subject Property had ceased for less than one year when he purchased the Subject Property. The Subject Property has historically and, except as noted above, continuously been utilized since the late 1960’s for industrial-type purposes, including motor freight activities which include loading and unloading citrus trucks, racking, truck repair, and truck weighing. These activities would not necessarily be restricted to an Industrial land use designation;8 the current use of the Subject Property as a motor freight terminal is also permitted within a BPC-2 land use designation. There has been no substantial change in the use of the Subject Property since 1980.9 Mr. Brooks testified that while he was growing up in Eloise, the Subject Property "was primarily truck parking for the citrus plant." He "worked for the scale house back in the late 60's before the plant went down and all [they] did was like park the trucks there for unloading and which would be in the citrus plant itself." However, he never knew the Subject Property "to be an industrial park itself," during the late 1960's. Historically, Mr. Snively, who died in 1957, owned several different businesses across the street from the Subject Property, including a fresh fruit packing house, JE 8A at "20", juice plant, JE 8A at "21", concentrate plant, JE 8A at “22”. The plant closed in 1969 or 1970. In and around 1972, during the summer, Mr. Smith worked for the Snively operation when they parked their citrus trucks on the Subject Property and then for the Alterman operation on-site when he loaded and unloaded trucks. Under the County's zoning ordinance adopted in November 1970, the Subject Property, along with the Phoenix Industries Property, its adjoining property, and the property southeast and adjacent to Snively Elementary School, were zoned as General Industrial (GI). Like the Subject Property, this industrial area is located east and immediately adjacent to property classified as residential (RS) (although the property is presently undeveloped). By an amendment to the FLUM adopted by Ordinance No. 91-06 on April 19, 1991, the Subject Property was classified as RS, rather than IND.10 At the same time, the Phoenix Industries Property, its adjoining property, and the property immediately adjacent to Snively Elementary all maintained their Industrial classification. The May 2000 Eloise Redevelopment Plan recommended, in part, consideration of "a plan amendment from RS to RL-4 for the properties north of Snively [Elementary] School and west of Snively Avenue" which included the Subject Property. EE 2, Plan at 38. On July 11, 2001, the County adopted Ordinance No. 01- 45, which changed the land use designation on the FLUM from RS to RL-4, for all of the property (including the Subject Property) between 1st Street and just south of 9th Street and between Snively Avenue on the east and the canal on the west. EE 1 at map page 2. The land use designation for the Snively- Brooks Park was also changed to INST-1 from IND. Other land use designations were changed pursuant to Ordinance No. 01-45. EE 1. See also Tr. 130-136, 139-140. The FLUM changes implemented strategies set forth in the Eloise Redevelopment Plan and adopted recommended changes to the FLUM. See Tr. 163. The RL-4 designated property is located immediately adjacent to and on the north, west, and south sides of the Subject Property. JE 8A. Across Snively Avenue from the RL-4 property is the industrial area which was previously used in the citrus industry and which is currently used by Phoenix warehousing and trucking activities. JE 8A. "The purpose of the [RL-4] District is to provide areas for low density residential needs of residents in urban areas who desire areas with smaller lots, a minimum of 6,000 square feet." § 204A7., Land Development Code (LDC). The County and Mr. Smith contend that the Subject Property was mistakenly or erroneously classified as RS in 1991 and RL-4 in 2001. However, the preponderance of the evidence indicates that no mistake or error was made in 1991 or 2001 based, in part, on the chronology of events regarding the land use changes mentioned above. Merle H. Bishop, A.I.C.P., the current Director of Growth Management for the County, has been an employee of Polk County for 30 years, and was involved in the adoption of the original Comprehensive Plan in 1991. In preparing land use designations for the initial FLUM, he used aerial photographs primarily and the existing zoning at the time. Since that time, he and staff have discovered errors in mapping the land uses of property, including industrial. Typically, the errors have been corrected when presented to the Board for comprehensive plan changes to the FLUM. Mr. Bishop testified that pursuant to a policy in the Comprehensive Plan, the County desired to “recognize industrial uses.” Tr. 444-445. According to Mr. Bishop, an active industrial use would only be eliminated with good reason, i.e., such as it was a remote and isolated industrial use. Tr. 455. According to Mr. Bishop, the Subject Property, the southern parcel by the elementary school, and the Phoenix Industries property made up a major industrial use area. Tr. 456. Although Mr. Bishop stated the Subject Property "would have been" designated as Industrial in 1991 given its use, Tr. 511-512, Mr. Bishop could not "say whether or not [they] missed this on the map when [they] mapped it. I mean it appears -- I mean, when you look at the map, it's very general; or whether there was an intention to not map it." Tr. 483-484. Mr. Bishop did not testify persuasively that the Board, in 1991 or in 2001, erroneously designated the Subject Property as RS and then RL-4. The February 2, 2005, staff report, mentions the applicant’s contention that a mapping error occurred, but implicitly rejects this argument. JE 3 at 11 and 12 of 27. Staff stated: The site has recently changed ownership and the current property owner wants the non-conforming uses to become conforming uses. Recognizing the existing use will enable to [sic] owner to continue utilizing the site as it has historically been used and allow the redevelopment of the property as needed. In addition, the use has remained the same since the early 1970’s according to the applicant. The applicant also states that Policy 2.113-A2 of the Comprehensive Plan states that the [FLUM] Series shall include all major existing industrial areas; since the property has historically been used for industrial uses, the recognition of the site will correct the County’s mapping error. On the other hand, staff and the ECRA has [sic] indicated, for this and the prior requested land use change (CPA 04A-05), that the impacts to the residential neighborhood is [sic] more significant than the redevelopment of the site for commercial or industrial uses. The County worked with the residents, business owners, and land owners in the area to develop a redevelopment plan, in which, the site was intentionally made non-conforming by the community and the County in order to create separation between the industrial uses across the street from the residential uses on the west side of CR 655 (Rifle Range Road [sic]). Therefore, the applicant’s primary argument for recognizing the historical use is not relevant. JE 3 at 12 of 27. Mr. Bishop was not directly involved with the staff review although he participated at the pubic hearing before the Board. If the Subject Property were vacant, Mr. Bishop would not recommend an Industrial land use designation. He supports the land use change because of the existing (at the time) use of the Subject Property and to have the property be a conforming use. Tr. 506-507. The history of industrial-type use on both the Subject Property and other sites in the Redevelopment Area has been a subject of significant concern. Although no tests have been conducted to determine whether the Subject Property is contaminated, Dr. Cherry testified that as a result of its long industrial use, it is likely that contamination will be present, which would render its use for residential purposes not realistic. Tr. 221-223. Since the subject property is located near the property upon which the community center was constructed and both parcels were part of a larger industrial area and utilized for similar uses, Dr. Cherry suspects that the Subject Property will likewise be contaminated. Tr. 222. If the Subject Property is contaminated, it is Dr. Cherry's opinion that there will be insufficient funds to clean the area. Tr. 219. Consequently, Dr. Cherry opined that if the Subject Property could not be used for industrial purposes, it would likely be unable to be developed as residential and most likely would be abandoned, thereby becoming a “brownfield.” This would significantly burden the redevelopment efforts in the Redevelopment Area. However, the Subject Property has not been declared a “brownfield” and no finding can be made regarding the environmental condition of the Subject Property based upon the record of this case. The Small Scale Plan Amendment Application and Adoption On or about August 10, 2004, Mr. Smith filed an application requesting the County to re-designate the land use of the Subject Property from RL-4 to IND. JE 2. According to the “Narrative Summary,” “[t]his change will provide for the continuation of historical motor freight uses and provide for optional industrial uses.” Id. On January 4, 2005, the County published Notice in a newspaper of local circulation providing that the Board would consider the adoption of the Plan Amendment at its meeting of January 19, 2005. At the January 19, 2005, meeting, the County tabled consideration of the Plan Amendment to its meeting of February 2, 2005. The Polk County Planning Division Staff report is dated February 2, 2005. This report contains a detailed analysis of the application. The Planning Division recommended denial of the Plan Amendment. (The report indicates that the Planning Commission recommended approval (3 to 1 vote) of the Plan Amendment.) The Planning Division found, in part, that "the proposed development request IS NOT compatible with surrounding land uses and general character of the area of the residential uses on the southern side of Snively Avenue (CR 655) and IS NOT consistent with the Polk County Comprehensive Plan for a land use change to Industrial (IND) because it would likely intrude into the existing residential neighborhood, allow for more intensive uses to be developed next to existing homes, and not be consistent with the approved Eloise Redevelopment Plan." (Emphasis is original). On February 2, 2005, the Board voted to adopt the Plan Amendment by the adoption of Ordinance No. 05-004.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Administration Commission enter a final order concluding that the Plan Amendment adopted by Polk County Ordinance No. 05-004 is not "in compliance" as defined in Section 163.3184(1)(b), Florida Statutes. DONE AND ENTERED this 8th day of July, 2005, in Tallahassee, Leon County, Florida. S CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of July, 2005.

Florida Laws (10) 120.569120.57163.3177163.3180163.3184163.3187163.3202163.3245163.356163.360
# 1
DEPARTMENT OF COMMUNITY AFFAIRS vs MONROE COUNTY, 98-000792GM (1998)
Division of Administrative Hearings, Florida Filed:Marathon, Florida Feb. 12, 1998 Number: 98-000792GM Latest Update: Feb. 04, 2002
Florida Laws (6) 163.3167163.3171163.3182163.3184163.3187163.3194
# 2
JIM DURHAM AND CITIZENS FOR PROPER PLANNING, INC. vs POLK COUNTY, 03-000593GM (2003)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Feb. 21, 2003 Number: 03-000593GM Latest Update: Jun. 29, 2004

The Issue The issue is whether Polk County's small scale development amendment (CPA2003S-02) adopted by Ordinance No. 03-03 on January 22, 2003, as later amended by Ordinance No. 03-19 on March 15, 2003, is in compliance.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background Berry is the owner of a tract of land located on the southwest corner of the intersection of Eagle Lake Loop Road (County Road 540-A) and Pollard Road in Section 16, Township 29, Range 26 in the eastern part of unincorporated Polk County, Florida. The property lies south of the City of Winter Haven, east-southeast of the City of Eagle Lake, less than a mile south of Lake Eloise (on which Cypress Gardens is located), and west of U.S. Highway 27. Because Berry owns property within the County, and submitted oral and written comments to the County prior to the adoption of the challenged amendment, it has standing to participate in this action. On July 19, 2002, Berry filed an application with the County Planning Department seeking to change the land use on 9.99 acres (or just below the threshold of 10.0 acres for a small scale amendment) from RL-1 to Neighborhood Activity Center (NAC) to include approximately 4.95 acres of various neighborhood specialty shops such as a grocery store, drug store, convenience store, and dry cleaners, with the remaining acreage used as a mini-warehouse self-storage facility. In September 2002, Berry amended its application by seeking to change 3.93 acres from RL-1 to CC and 6.06 acres from RL-1 to BPC-1. The application was assigned Case File No. CPA2003S- 02. Under the County's review process, the application is first reviewed by the County Development Review Committee (Committee), then by the County Planning Commission (CPC), which either accepts or rejects the Committee's recommendation, and finally by the Board of County Commissioners (Board), which either adopts the amendment, adopts the amendment as amended by the Board, or rejects the amendment. After conducting a preliminary review of the application, on September 16, 2002, the Committee conducted a public hearing and voted to recommend approval. The matter was then transmitted to the CPC, which conducted a meeting on October 9, 2002, and recommended that the Board approve the amendment. On January 22, 2003, by a 3-2 vote, the Board adopted CPA2003S-02 changing the designation on the FLUM of the County Comprehensive Plan (Plan) as proposed by Berry. This was confirmed by the County's adoption of Ordinance No. 03-03. On February 21, 2003, Petitioners filed their Petition challenging the Berry amendment. The matter was again placed on the Board's agenda on March 19, 2003, after the County discovered that Ordinance No. 03-03 had inadvertently changed the land use on the entire parcel to CC rather a mix of CC and BPC-1. In addition, there were minor errors in the legal description of both the 3.93 and 6.06-acre parcels. Accordingly, Ordinance No. 03-19 was enacted to correct those errors. A second Petition for Formal Administrative Proceedings (with essentially the same allegations, but also adding an allegation that the same property had been improperly subject to two small scale amendments within a 12- month period) was filed by Petitioners on March 19, 2003, challenging the action taken in Ordinance No. 03-19. At the outset of the final hearing, Petitioners voluntarily dismissed two allegations contained in their Petition. In their Proposed Recommended Order, Petitioners have further narrowed the issues by addressing only the following allegations: that the property which is the subject of this proceeding exceeds 10.0 acres in size and therefore cannot qualify as a small scale amendment; and that the amendment violates Future Land Use Element (FLUE) Policies 2.102-A1, 2.113-B-3, 2.113-B-4, 2.110-C3, and 2.113-B-1 and is thus internally inconsistent with the Plan. These issues will be discussed separately below. All other allegations contained in the second Petition and the parties' Pre-Hearing Stipulation are deemed to have been withdrawn or abandoned. Because the change in the FLUM was filed and approved as a small scale plan amendment under Section 163.3187(1)(c), Florida Statutes (2003),1 a compliance review of the amendment was not made by the Department of Community Affairs (DCA). See § 163.3187(3)(a), Fla. Stat. Standing of Petitioners Durham is a realtor/developer who owns property within 250 feet of Berry's property and resides at 10 Lake Eloise Lane, Southeast, Winter Haven, Florida. He made oral and written comments to the County prior to the adoption of the amendment. As such, he qualifies as an affected person under Section 163.3184(1)(a), Florida Statutes, and has standing to bring this action. CPPI began as an association in November 2002 and was later incorporated in February 2003. Presently, it has around 100 members, all of whom reside in the County. According to its chairperson, its purpose is to "help educate and inform residents of Polk County . . . towards growth matters that may affect their daily lives." The organization "encourages donations" from its members; it was scheduled to have conducted its first annual meeting on January 10, 2004; and members prepared and circulated petitions opposing the amendment to residents of the area in December 2002 and January 2003. At least one member of CPPI made written and oral comments on its behalf to the County prior to the adoption of the amendment in March 2003. There is no evidence, however, that CPPI (as opposed to its individual members) owns property or owns or operates a business within the County. Therefore, it lacks standing to file a petition. The land and surrounding uses Berry owns a triangle-shaped parcel of land (the parent parcel) totaling around 14 acres which fronts on Eagle Lake Loop Road (a 24-foot wide urban collector road) to the north, Pollard Road (a local road) to the east, and a CSX railroad track, with right-of-way, on its western side. (Pollard Road dead ends at Eagle Lake Loop Road, and another collector road, Eloise Loop Road, continues to the north from the intersection). Pollard Road provides access to eight nearby single-family homes, which lie south of the Berry property and front on Pollard Road, and eventually terminates at the City of Winter Haven's Sewage Treatment Plant (an institutional use), which lies slightly more than a mile south of the site. To the west of the site directly across the railroad tracks and fronting on Eagle Lake Loop Road is additional property owned by Berry and on which were once located the original Berry corporate offices. The Berry office buildings are now used, at least partially, by other tenants. Although the land across the railroad tracks is classified as Residential Suburban (RS), the property can be used for offices since the buildings were constructed, and office use began, prior to the adoption of the Plan. Directly across Pollard Road to the east is a vacant 10-acre tract of land owned by the Baptist Ridge Association, which intends to construct a church on the property. Berry's property is now classified as RL-1, a land use classification which "is characterized by single-family dwelling units, duplex units, and small-scale multi-family units." Since at least the 1950s, however, or long before the County adopted its Plan, the property has been used primarily for agriculture purposes (citrus groves); therefore, Berry is grandfathered to continue this non-conforming use on its property. Presently, the entire tract of land is undeveloped and largely covered by an orange grove, which Berry describes as "past maturation and is declining." Citrus trucks and trailers have been parked on the extreme northwestern corner of the parent parcel and are used in conjunction with the citrus operation. Except for the former Berry offices, a nearby beauty salon operating out of a house, and a convenience store about three-quarters of a mile away, which all began operation before the Plan was adopted and are grandfathered as non- conforming uses, and the City of Winter Haven's large tract of institutional land to the south, all of the property within slightly less than a one-mile radius of the Berry property is classified in various residential land use categories with only residential uses. The Amendment As noted above, Berry has owned the subject property for many years. In 1987, Berry (then under the name of Jack M. Berry, Sr.) made application with the County for a zoning change on the property from Rural Conservation (RC) to Commercial (C-3) to allow typical commercial uses. The application was ultimately denied by the County on the ground, among others, that the zoning district being proposed was inconsistent with the Plan, "given the residential development pattern in the area." At least partly on the theory that the area has changed substantially in the last 15 years, Berry has filed (and the County has approved) an application seeking to change the land use on the property to commercial uses. Berry has carved out of the parent parcel two smaller parcels totaling 9.99 acres in size and seeks to change the land use on the northern parcel (3.93 acres) to CC and the land use on the southern parcel (6.06 acres) to BPC-1. The remaining land in the parent parcel, which consists of a 0.43-acre triangle-shaped parcel on the northwestern corner of the parent parcel and now used by citrus trucks, and a vacant 2.74-acre triangle-shaped parcel on the southern end, will remain R-1. (However, all parties agree that if the amendment is approved, these remaining parcels will be unsuitable for residential development.) In addition, strips of land ranging from 22 to 28 feet in width which front on Eagle Lake Loop Road and Pollard Road will be dedicated to the County for right-of-way and have not been included in the 9.99-acre amendment. Presumably, the proposed change is being done in this manner so that the total acreage is less than 10.0 acres, which qualifies the application to be processed as a small scale development amendment rather than a regular plan amendment and subject to DCA review and approval. If the change is approved, the northern part of the parcel (3.93 acres) will be changed to CC to develop convenience commercial uses. Under the Plan, the most typical tenant in this category is a convenience store, while other typical tenants include laundry, dry cleaning, barber, restaurant, gas station, and office uses. The southern (and larger) portion of the tract will be changed to BPC-1. The most typical tenant in this category is "[o]ne or more light- assembly plants, or warehouse facilities," which include a mini-warehouse storage facility. Other typical tenants described in the Plan are offices, distribution centers, research and development firms, and high-density residential, with proper buffering. (Berry says it intends to build a mini-warehouse facility on the southern parcel; however, any of the above described uses could be placed on the property if the change is approved.) Petitioners' Objections In broad terms, Petitioners have contended that the small scale amendment actually involves a use of more than 10 acres since the strips of land being dedicated as right-of-way to the County must be counted as a part of the land being amended. They also contend that the plan amendment violates five FLUE policies and is therefore internally inconsistent with the Plan. A small scale development amendment can only be adopted if "[t]he proposed amendment involves a use of 10 acres or fewer." See § 163.3187(1)(c)1., Fla. Stat. The parties have agreed that the legal description of the parcel subject to the change includes only 9.99 acres, or less than the 10-acre threshold. However, prior to the development of the site, Berry intends to dedicate to the County two strips of land, one fronting on Eagle Lake Loop Road (28 feet wide), and the other on Pollard Road (22 feet wide), for future right-of-way for some public purpose. Petitioners contend that the right-of-way constitutes essential infrastructure for the development and must be included as a part of the amendment. If this land is added to the amendment, the total acreage would obviously exceed 10.0 acres. The dedicated land is not "essential infrastructure" needed for the development activities on the land, since two roadways (Eagle Lake Loop Road and Pollard Road) already exist on the northern and eastern boundaries of the property, and they are sufficient in size to provide ingress to, and egress from, the property. Instead, the County will "bank" the land in the event some form of right-of-way activity is needed in the future. It is noted that Eagle Lake Loop Road was recently widened to 24 feet, and it is not anticipated that a further widening will occur for a number of years. There is nothing in the Plan which requires an applicant for an amendment to include all of its property in a proposed amendment, or prevents an applicant from leaving a residual piece of property out of the application. Therefore, Berry was not required to include in the amendment the right- of-way or the two smaller residual pieces of property that will remain R-1. Finally, assuming arguendo that Petitioners' contention is correct, that is, that an applicant must include right-of-way land dedicated to the local government in the total acreage calculation, Berry could still lawfully comply with the 10-acre threshold by simply reducing the other acreage being changed to CC or BPC by the amount of land being dedicated to the local government for right-of-way. Therefore, it is found that Berry has not improperly excluded from the amendment land necessary for essential infrastructure so as to violate Section 163.3187(1)(c)1., Florida Statutes, as alleged by Petitioners. Policy 2.102-A1 requires compatibility between adjacent uses. More specifically, it provides that: Land shall be developed so that adjacent uses are compatible with each other, pursuant to the requirements of other Policies in this Future Land Use Element, so that one or more of the following provisions are accomplished: there have been provisions made which buffer incompatible uses from dissimilar uses; incompatible uses are made to be more compatible to each other through limiting the intensity and scale of the more intense use; uses are transitioned through a gradual scaling of different land use activities through the use of innovative development techniques such as a Planned Unit Development. Therefore, as the Plan is now written, so long as Berry develops the land in a manner which accomplishes at least one of the three "provisions" in paragraphs a - c of the policy, so as to make the adjacent uses compatible, the proposed land use change is permissible. As noted above, except for a few non-conforming uses adjacent to, or near the property, virtually all of the area around the Berry property is designated for residential use. The area to the north and northeast is developed with up-scale (with some homes ranging to as high as $1 million in value), low density, large lot, single-family residential subdivisions, including Harbour Estates, Cedar Cove, Cypress Cove, Gaines Cove, and Valhalla. To the east of the site are more subdivisions, including Eloise Place, Skidmore, Cypress Point, Lake Eloise Estates, Eloise Pointe Estates, a mobile home park, and Little Lake Estates. The lands to the south are primarily agriculture and in active citrus groves, with eight single-family homes on Pollard Road. Finally, a church will be built on the property directly across the street from the Berry property at the southeast corner of the intersection of Eagle Lake Loop Road and Pollard Road. The County Planning Director agrees that a convenience store (which is an authorized use on CC land), standing alone, is incompatible with adjacent single-family residences. Given this acknowledgement, and the fact that a non-binding, proposed site plan submitted by Berry with its application does not provide for any buffering between the commercial uses and the residential areas, Petitioners contend that none of the conditions required for compatibility in paragraphs a through c have been met, and thus the policy has been violated. The County has made clear, however, that when a final site plan is submitted, there must be "provisions [in the site plan] . . . which buffer incompatible uses from dissimilar uses," as required by the policy. Assuming that this is done at the site plan stage, at least one of the three provisions will be accomplished, thereby satisfying the compatibility requirement. This being so, the plan amendment does not violate the policy and in this respect is not internally inconsistent with the Plan. Petitioners next contend that the amendment is inconsistent with Policy 2.110-C3, which contains locational criteria for CC property. One such criterion requires that "Convenience Centers shall be located at the intersections of arterial and/or collector roads." Because the property is at a T-shaped intersection (as opposed to a traditional cross intersection with four directions for traffic to move off the site), Petitioners assert that the property is not located at an "intersection" within the meaning of the policy. Eagle Lake Loop Road, on which the northern boundary of the property fronts, is designated as an urban collector road. That road forms an intersection with Pollard Road (a local road) and Eloise Loop Road (also an urban collector road), which meets Eagle Lake Loop Road from the north at the intersection, and then makes a 90 degree turn to the east. (When Eagle Lake Loop Road continues to the east beyond the intersection, it turns into Eloise Loop Road, and later into Thompson Nursery Road, until it eventually intersects with U.S. Highway 17.) There is no dispute that the two collector roads (Eagle Loop Lake Road and Eloise Loop Road) form a T intersection, rather than a traditional cross intersection. For many years, however, the County has considered a T intersection and a cross intersection to be the same in terms of satisfying Plan requirements. Indeed, at the present time, at least four other CC designated properties within the County are located at T intersections. The County's interpretation of the policy is consistent with sound planning principles, is reasonable and logical, and is more persuasive than the contrary view offered by Petitioners. Accordingly, it is found that the amendment does not conflict with Policy 2.110- C3. Petitioners also contend that the amendment is inconsistent with Policy 2.113-B-3, which provides that "Business-Park Centers shall be located with consideration being given to regional transportation issues, and should be located at the intersections of arterial roads, and preferably on a fixed-route mass-transit line." (Emphasis added.) The use of the word "should" (rather than "shall") is intended to state a preference, but not an absolute requirement, that BPC lands be located at the intersections of arterial roads. According to the County's Planning Director, this is because "most cases that come [before the County] don't meet the ideal situation" of satisfying every requirement, and the County has used this permissive language to give itself some degree of flexibility in handling cases that do not meet every Plan requirement. Therefore, even though it is preferable that BPC land be located at the intersection of arterial roads, this requirement is not mandatory, and the County has the flexibility to approve a BPC land use change at property not sited at the intersection of arterial roads. In contrast to the permissive language described above, Policy 2.113-B-4 provides that development within a Business-Park Center shall conform to certain development criteria, including one that Business-Park Centers shall have frontage on, or direct access to, an arterial roadway, or a frontage road or service drive which directly serves an arterial roadway. Business-Park Centers shall incorporate the use of frontage roads or shared ingress/egress facilities wherever practical. In this case, the closest arterial roadway to Berry's property is State Road 17 to the west, which is four miles away, while State Road 60, another arterial roadway, is approximately six miles to the south. These arterial roads must be accessed, at least at the beginning of the trip, by Eagle Lake Loop Road, a two-lane, 24-foot wide urban collector that runs through predominately residential neighborhoods with some homes having fences within a foot or two from the road. The County interprets the requirement that BPC land have "direct access to an arterial road" to be satisfied if the property fronts on a collector road, which then provides access to an arterial road. Under the County's interpretation, the requirement is met since Eagle Lake Loop Road provides access (albeit 4 to 6 miles away) to State Roads 17 and 60. The County says it has consistently interpreted this provision in this manner for at least ten years, and has approved other applications for changes to BPC when those parcels were located on urban collector roads. (The distance between these other BPC parcels and the arterial roads is not of record, however.) While Policy 2.113-B-1 provides that Business-Park Centers are "not intended to accommodate major commercial or other high-traffic producing facilities," they "are intended to promote employment opportunities within the region by allowing for the establishment of office parks, research and development parks, areas for light-industrial facilities, distribution centers, and mixed-use employment parks." The same policy provides that they must have a usable area of 10 acres or more, have a service-area radius of 20 miles or more, be supported by a population of 150,000 or more people, and have a gross leasable area of 500,000 to 2,000,000 square feet. Given this description of their purpose and characteristics, and the wide range of commercial activities that are allowed on Business-Park Center lands, it is not surprising that Policy 2.113-B-3 provides that BPC lands should be located "at the intersections of arterial roads, and preferably on a fixed-route mass-transit line," while Policy 2.113-B-4 requires that they "have direct frontage on, or direct access to, an arterial roadway, or a frontage road or service drive which directly serves on an arterial roadway." When reading these provisions as a whole, it is unreasonable to conclude, as the County does, that "direct access" contemplates a drive of over 4 miles, partly on a narrow two- lane road, in order to reach an arterial road. Accordingly, on this issue, Petitioners' evidence is the most persuasive, and it is found that the plan amendment conflicts with Policy 2.113-B-4 and in this respect is internally inconsistent with the Plan. Policy 2.110-C3 sets forth the following location criteria for Convenience Centers: LOCATION CRITERIA Convenience Centers shall be located at the intersections of arterial and/or collector roads. There shall be the following traveling distance, on public roads, between the center of Convenience Center and the center of any other Convenience Center, or other higher- level Activity Center, Linear Commercial Corridor, or Commercial Enclave providing for the same convenience shopping needs: One (1) mile within the UDA and UGA Two (2) miles within the SDA and UEA This required separation may be reduced if: The higher-level Activity Center, Linear Commercial Corridor or Commercial Enclave within the required distance separation is over 80 percent developed; or the proposed Convenience Center market- area radius, minimum population support is over 5,000 people. Petitioners contend that this policy has been violated in two respects: the Berry property is not located at the intersection of arterial roads; and there is an existing convenience center located within 0.8 mile of the Barry property, and Berry cannot qualify for a reduction in the required separation, as described in paragraphs a and b. For the reasons stated in Findings of Fact 30-32, it is found that the Berry property is located at the intersection of two collector roads (Eagle Lake Loop Road and Eloise Loop Road) and that a T intersection satisfies the requirements of the policy. As to the second contention, the Berry property is located within an UGA (Urban Growth Area), and an existing convenience store is located at the intersection of Rifle Range Road and Eagle Lake Loop Road, or less than a mile west of Berry's property. The land use on the property on which the store sits was recently changed (in December 2003) to BPC, which does not allow a convenience store. However, the store is a non-conforming use, having been located at that site before the Plan was adopted. The locational requirement in Policy 2.110-C-3 that CC lands within the UGA be located at least a mile apart is not the least bit vague or ambiguous: CC designated lands (and not individual convenience stores, as Petitioners suggest) must be separated by at least a mile, unless one of the two criteria for reducing this separation is met. Because there is no CC land within a one-mile radius of the Berry land, the policy has not been violated. Policy 2.113-B-1 sets forth the following relevant characteristic for Business-Park Centers: General characteristics of Business-Park Centers are: Usable Area 10 acres or more There is no dispute that the useable area for the BPC land is only 6.06 acres, or approximately 60 percent of the required acreage. Petitioners contend that the amendment violates the foregoing policy because the useable area on Barry's property is much less than "10 acres or more." While the former County Planning Director conceded that the 10-acre usable area requirement is "mandatory," he justified the amendment on the ground that the 6.06 acres "approximates" 10 acres, and thus satisfies the policy. In the same vein, the current County Planning Director asserted that if Berry was proposing a stand-alone BPC, it would have been required to have 10 usable acres. In this case, though, he pointed out that the Berry property will be used for a nonresidential mixed use (BPC and CC) totaling almost 10 acres, and therefore Berry has satisfied the requirement. The Planning Director admitted, however, that nothing in the Plan specifically allows this type of exception. He justified the County's action on the theory that the Plan "doesn't anticipate every situation that comes in," and "interpretations have to be made of the comprehensive plan and how it's applied." The requirement that Business-Park Centers have a usable area of 10 or more acres is clear and unambiguous, was characterized as being "mandatory," and is not subject to any exceptions in the Plan. This being so, the County's interpretation is found to be unreasonable and contrary to the plain language in the policy, and in this respect the plan amendment is internally inconsistent with the Plan.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Administration Commission enter a final order determining that the small scale development amendment (CPA2003S-02) adopted by Polk County by Ordinance No. 03-03, as amended by Ordinance No. 03-19, is not in compliance. DONE AND ENTERED this 24th day of February, 2004, in Tallahassee, Leon County, Florida. S DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of February, 2004.

Florida Laws (5) 120.569163.3177163.3184163.31876.06
# 3
CLIFTON CURTIS HORTON AND HORTON ENTERPRISES, INC. vs CITY OF JACKSONVILLE, 10-005965GM (2010)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Jul. 21, 2010 Number: 10-005965GM Latest Update: Mar. 22, 2011

The Issue The issue is whether a text amendment to the general description of the Commercial land use designations of the Comprehensive Plan (Plan) of Respondent, City of Jacksonville (City), adopted by Ordinance No. 2010-401-E on June 22, 2010, is in compliance.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: The Parties The City is a municipal entity and is responsible for enacting and amending its Plan. Since 2007, the City has participated in the Pilot Program for adoption of comprehensive plan amendments. Except for amendments based on the Evaluation and Appraisal Report or amendments based on new statutory requirements that specifically require that they be adopted under the "traditional" procedure described in section 163.3184, and small-scale amendments, all other amendments must be adopted under that process. Under the Pilot Program, municipalities have "reduced state oversight of local comprehensive planning," and plan amendments may be enacted in "an alternative, expedited plan amendment adoption and review process." § 163.32465, Fla. Stat. Although the City must send a transmittal package to the Department of Community Affairs (Department) and other designated agencies for their preliminary review, the Department does not issue an Objections, Recommendations, and Comments Report or a notice of intent. Instead, the Department "may provide comments regarding the amendment or amendments to the local government." Id. It may also initiate an administrative proceeding to challenge whether an amendment is in compliance. Id. In this case, the Department did not file adverse comments or initiate a challenge to the City's amendment. Clifton Curtis Horton owns real property located at 7175 Blanding Boulevard, Jacksonville, Florida. Horton Enterprises, Inc., is a Florida corporation that owns and operates a "strip club" known as "New Solid Gold" located on Mr. Horton's property. The club is an "adult entertainment establishment" as defined by the Jacksonville Municipal Code (JMC). See §§ 150.103(c) and 656.1101, JMC. History Preceding the Amendment In order to operate an adult entertainment facility within the City, the facility must have both a correct land use and zoning classification. The location must also satisfy certain distance limitations from schools (2,500 feet), other adult entertainment businesses (1,000 feet), churches (1,000 feet), residences (500 feet), and businesses selling alcohol (500 feet). See § 656.1103(a)(1)-(4), JMC; § 847.0134, Fla. Stat. Prior to 2005, adult entertainment facilities were an authorized use in the Heavy Industrial (HI) land use category. In 2005, the City adopted Ordinance No. 2005-1240-E, which approved a text amendment to the Future Land Use Element (FLUE) of the City's 2010 Plan adding the following language to the Community/General Commercial (C/GC) land use category: "Adult entertainment facilities are allowed by right only in Zoning District CCG-2." See Respondent's Exhibit D. That classification is the primary zoning district within the C/GC land use category. The Ordinance also deleted the following language from the HI land use category: "Adult entertainment facilities are allowed by right." Id. The purpose of the amendment was to change the permissible land use designation for adult entertainment facilities from HI to C/GC with a further condition that the property must also have a CCG-2 zoning classification. At the same time, the City enacted Ordinance No. 2005-743-E, which adopted a new zoning requirement that any adult entertainment facility whose location was not in conformity with the revised land use/zoning scheme must close or relocate within five years, or no later than November 10, 2010. See § 656.725(k), JMC. Because New Solid Gold did not conform to these new requirements, it would have to close or relocate within the five-year timeframe. On an undisclosed date, Horton Enterprises, Inc., and two other plaintiffs (one who operated another adult entertainment facility in the City and one who wished to open a new facility) filed suit in federal court challenging the constitutionality of the City's adult zoning scheme and seeking to enjoin the five-year amortization requirement, as applied to them. See Jacksonville Property Rights Ass'n v. City of Jacksonville, Case No. 3:05-cv-1267-J-34JRK (U.S. Dist. Ct., M.D. Fla.). On September 30, 2009, the United States District Court entered a 33-page Order generally determining that, with one exception not relevant here, the City's zoning and land use scheme was permissible. See Petitioners' Exhibit V. On November 3, 2009, that Order was appealed by Petitioners to the United States Court of Appeals for the 11th Circuit where the case remains pending at this time. The parties' Stipulation indicates that oral argument before that Court was scheduled during the week of December 13, 2010. An Order of the lower court memorialized an agreement by the parties that the five- year time period for complying with the new requirements are stayed until the federal litigation is concluded. See Petitioners' Exhibit JJ. The Court's Order also noted that an "ambiguity" in the Plan arose because the City failed to "remove the language in the general description of the Commercial land use designations acknowledging its intention to locate adult entertainment facilities in the HI category." Id. at 19. This occurred because when adopting the new amendments, the City overlooked conflicting language in the general description of the Commercial land use designations in the FLUE. However, the Court resolved the ambiguity in favor of the City on the theory that the conflicting language was contrary to the City's overall legislative intent in adopting the new land use/zoning scheme and could be disregarded. Id. Thereafter, a new amendment process was begun by the City to delete the conflicting language. This culminated in the present dispute. The Transmittal Amendment - 2010-35-E To eliminate the ambiguity, the City proposed to amend the FLUE by deleting the following language from the general description of the Commercial land use designations: "Adult entertainment facilities are allowed by right in the heavy industrial land use category, but not in commercial." This amendment was numbered as Ordinance No. 2010-35-E. A public workshop was conducted by the City's Planning and Development Department on December 14, 2009. Thereafter, public hearings were conducted by the City Planning Commission on February 11, 2010; by the City Council Land Use and Zoning Committee on February 17, 2010; and by the full City Council on February 9 and 23, 2010. It became effective upon the Mayor signing the Ordinance on February 26, 2010. Although the Ordinance inadvertently referenced section 163.3184 as the statutory authority for its adoption, it also stated that the amendment was being transmitted for review "through the State's Pilot Program." See Petitioners' Exhibit E. As required by the Pilot Program, copies of the amendment were then transmitted to the Department and seven other agencies. No adverse comments were received from any agency. It is undisputed that Petitioners did not attend the the workshop or any hearing, and they did not submit written or oral comments concerning the proposed amendment. When the process for adopting Ordinance No. 2010-35-E began, the City's 2030 Plan was still being reviewed by the Department and had not yet become effective. Consequently, at the Department's direction, the Ordinance referenced the City's then-effective 2010 Plan as the Plan being amended. On February 3, 2010, the City's 2030 Comprehensive Plan became effective, replacing the 2010 Plan. However, the 2030 Plan contained the same conflicting language. Notice of the public hearings for Ordinance No. 2010- 35-E (and other plan amendments adopted at the same time) was published in the Daily Record on January 29, 2010, a local newspaper that the City has used for advertising plan amendments since at least 2003. The parties agree that the legal advertisements complied with the size, font, and appearance requirements of section 166.041(3)(c)2.b. Besides the above notice, an additional notice regarding Ordinance No. 2010-35-E was published in the Florida Times Union on January 31, 2010. The parties agree that this advertisement did not meet the size, font, and appearance requirements of section 166.041(3)(c)2.b. but was published by the City for the purpose of providing additional public notice and to broaden the coverage of the plan amendment. The Adoption Amendment - 2010-401-E Because the 2030 Plan contained the same conflicting language in the Commercial land use descriptions, on May 25, 2010, a draft of Ordinance No. 2010-401-E was introduced at City Council for the purpose of deleting this language. Except for referencing the latest Plan, the language in Ordinance Nos. 2010-35-E and 2010-401-E was identical. While somewhat unusual, this procedure was authorized by the Department because the 2030 Plan became effective during the middle of the amendment process. A copy of the draft Ordinance and schedule for the upcoming hearings on that Ordinance was emailed by the City's counsel to Petitioners' counsel on June 4, 2010. See Petitioners' Exhibit FF. Public hearings on Ordinance No. 2010-401-E were conducted by the Planning Commission on June 10, 2010; by the City Council Land Use and Zoning Committee on June 15, 2010; and by the full City Council on June 8 and 22, 2010. All of the meetings occurred after Petitioners' counsel was given a schedule of the hearings. The amendment became effective upon the Mayor signing the Ordinance on June 24, 2010. Notice of the public hearings for Ordinance No. 2010- 401-E was published in the Daily Record on May 28, 2010. The parties agree that the size, font, and appearance requirements of section 166.041(3)(c)2.b. were met. An additional notice of the public hearings was published in the Florida Times Union on May 30, 2010. The parties agree that this legal advertisement did not meet the size, font, and appearance requirements of section 166.041(3)(c)2.b., but was published by the City for the purpose of providing additional public notice and to broaden the coverage of the plan amendment. Ordinance No. 2010-401-E, as originally proposed, incorrectly referenced section 163.3184, rather than the Pilot Program, as the statutory authority for adopting the amendment. During the hearing conducted by the City Council Land Use and Zoning Committee on June 15, 2010, an amendment to Ordinance No. 2010-401-E was proposed changing the statutory authority to section 163.32465. The City proposed the same amendment for 19 other plan amendments being considered at the same hearing. The amendment was minor in nature and had no effect on the substance of the Ordinance. It is undisputed that Petitioners did not appear or submit written or oral comments at any public hearing regarding Ordinance No. 2010-401-E. On July 21, 2010, Petitioners timely filed their Petition with DOAH challenging Ordinance No. 2010-401-E. Their objections, as later refined in the Stipulation, are both procedural and substantive in nature and are discussed separately below. Petitioners' Objections Substantive Objections As stated in the Stipulation, Petitioners contend that the amendment is not in compliance because it "is inconsistent with the balance of the 2030 Comprehensive Plan, and underlying municipal policies, since it forces adult uses into zones which permit residential and educational uses." To support this claim, Petitioners point out that the C/GC land use category permits a wide range of uses, including commercial uses in close proximity to sensitive uses, such as schools, churches, and residential areas. Petitioners characterize the current range of uses in C/GC as "an excellent planning approach to downtown Jacksonville" and one that promotes a well-reasoned, mixed-use development in the urban area. Because Ordinance No. 2010-401-E "forces" adult uses into the C/GC category where, despite the distance limitations, they will have to co-exist with sensitive uses, Petitioners contend the amendment is inconsistent with Policy (15)(b)3. and Goal (16) of the State Comprehensive Plan, which generally encourage orderly, efficient, and functional development in the urban areas of the City. Further, they assert it would contradict the City's "policy" of separating adult uses from residences, businesses, and schools. Petitioners' primary fear is that if they are required to relocate from HI to C/GC where sensitive uses are allowed, this will generate more complaints from schools, churches, and residents, and result in further zoning changes by the City and more forced relocations. As explained by Mr. Killingsworth, Director of the City's Planning and Development Department, Ordinance No. 2010- 401-E does not change the permitted uses in the Commercial or HI land use categories. Those changes in permitted uses were made by Ordinance No. 2005-1240-E in 2005 and are now being litigated in federal court. The purpose of the new amendment is simply "to clear up an inconsistency [noted by the federal court but told that it could be disregarded] that existed in the comprehensive plan." Mr. Killingsworth added that even if the language remained in the Plan, it would have no regulatory weight since the actual language in the C/GC and HI categories, and not the "header" or general description that precedes the category, governs the uses allowed in those designations. Assuming arguendo that the new amendment constitutes a change in permitted uses, the City established that from a use standpoint, adult entertainment facilities (like businesses selling alcohol) are more consistent with the C/GC land use category with the appropriate distance limitations from schools, churches, and residential areas. Further, the placement of adult entertainment facilities on property with a C/GC designation will not necessarily result in their being closer to residential property, as the City currently has a "great deal" of HI land directly adjacent to residential properties, as well as grandfathered enclaves of residential areas within the HI category. The City also established that the HI category is set aside for uses that generate physical or environmental impacts, which are significantly different from the "impacts" of a strip club. Finally, while a plan amendment compliance determination does not turn on zoning issues, it is noteworthy that the CCG-2 zoning district is the City's most intensive commercial district, and that very few schools (all grandfathered) remain within that zoning classification. The preponderance of the evidence supports a finding that the amendment is consistent with the State Comprehensive Plan and internally consistent with the "balance of the 2030 Comprehensive Plan." Procedural Objections Petitioners' principal argument is that the City did not publish a notice for either Ordinance in a newspaper of general circulation, as described in section 166.041(3)(c)2.b., or in the proper location of the newspaper; that these deficiencies violate both state law and a Department rule regarding notice for the adoption of this type of plan amendment; and that these procedural errors require a determination that the amendment is not in compliance. They also contend that because the legal notice did not strictly comply with sections 163.3184(15)(e) and 166.041(3)(c)2.b., both Ordinances are void ab initio.2 As noted above, the City has published legal notices for plan amendments in the Daily Record since at least 2003. The newspaper is published daily Monday through Friday; it has been published continuously for 98 years; it is published wholly in English; it is mailed to 37 zip codes throughout the City and around 20 zip codes outside the City; most of its revenue is derived from classified and legal advertisements; it is considered by the United States Postal Service to be a general circulation newspaper; it is available in newsstands throughout the City; and although much of the newspaper is directed to the business, legal, and financial communities, the newspaper also routinely contains articles and editorial content regarding special events, sporting news, political news, educational programs, and other matters of general interest pertaining to the City that would be of interest to the general public and not just one professional or occupational group. Its publisher acknowledges that the newspaper is a "Chapter 50 periodical," referring to chapter 50 and specifically section 50.031, which describes the minimum standards for newspapers that can be utilized for publishing certain legal notices. Also, its website states that it covers political, business, and legal news and developments in the greater Jacksonville area with an emphasis on downtown. Although Petitioners contend that the legal notice was published in a portion of the Daily Record where other legal notices and classified advertisements appear, as proscribed by section 166.041(3)(c)2.b., and is thus defective, this allegation was not raised in the Petition or specifically in the parties' Stipulation. Therefore, the issue has been waived. Both proposed recommended orders are largely devoted to the issue of whether the Daily Record is a newspaper of general paid circulation as defined in section 166.041(3)(c)2.b. For the reasons expressed in the Conclusions of Law, it is unnecessary to decide that question in order to resolve the notice issue. Petitioners received written notice that the City intended to adopt Ordinance No. 2010-401-E prior to the public hearings, along with a copy of the draft Ordinance and "everything" in the City's file. They also received a copy of all scheduled hearings during the adoption process. See Petitioners' Exhibits EE and FF. Therefore, notwithstanding any alleged deficiency in the published legal notice, they were on notice that the City intended to adopt the plan amendment; they were aware of the dates on which public hearings would be conducted; and they had an opportunity to submit oral or written comments in opposition to the amendment and to otherwise participate in the adoption process. Given these facts, even assuming arguendo that the publication of the legal notice in the Daily Record constitutes a procedural error, there is no evidence that Petitioners were substantially prejudiced in any way. Petitioners also contend that reference by the City to section 163.3184, rather than the Pilot Program, in the draft ordinance during the preliminary stages of the amendment process is a procedural error that rises to the level of requiring a determination that the amendment is not in compliance. This argument is rejected as the error was minor in nature, it was corrected shortly after Ordinance No. 2010-401-E was introduced, it did not affect the substance of the amendment, and it would not confuse a member of the public who was tracking the amendment as to the timing and forum in which to file a challenge. In Petitioners' case, they cannot claim to be confused since they timely filed a Petition with DOAH, as required by section 163.32465(6)(a). Finally, intertwined with the procedural arguments is the issue of whether Petitioners are affected persons and thus have standing to challenge the plan amendment. The parties have stipulated that Petitioners (or their representative) did not attend any meeting regarding the adoption of either Ordinance. Petitioners argue, however, that emails between the parties in May and June 2010, and a telephone conference call on June 3, 2010, involving Petitioners' counsel and the City's then Deputy General Counsel, equate to the submission of written and oral comments regarding the amendment. The parties have stipulated that the following written communications between Petitioners and the City occurred in May and June 2010: Petitioners made a public records request regarding the amendment on May 21, 2010, to Cheryl Brown, Council Secretary/Director, seeking various public documents relating to Ordinance No. 2010-35-E, transmitted by electronic mail and facsimile. On May 27, 2010, counsel for Petitioners exchanged emails with Assistant General Counsel Dylan Reingold regarding pending document requests relating to Ordinance No. 2010-35-E, and Mr. Reingold provided a number of responsive documents. On June 3, 2010, Cindy A. Laquidara, then Deputy General Counsel (but now General Counsel), sent an email to Petitioners' counsel stating: "Below please find the schedule for the passage of the comp plan changes. Call me with questions or to discuss. Take care." On June 4, 2010, counsel for Petitioners exchanged a series of emails with Assistant General Counsel Reingold regarding the status of Ordinance Nos. 2010-35-E and 2010-401-E, as well as the review of the proposed plan amendment by the Department of Community Affairs. On June 4, 2010, Jessica Aponte, a legal assistant with counsel for Petitioners' office, exchanged emails with Jessica Stephens, legislative assistant, regarding the proofs of publication for the legal advertisements relating to Ordinance No. 2010- 35-E. The affidavits of Petitioners' counsel (Petitioners' Exhibits KK and LL) regarding a conversation with the City's then Deputy General Counsel would normally be treated as hearsay and could not, by themselves, be used as a basis for a finding of fact. See § 120.57(1)(c), Fla. Stat. However, the parties have stipulated that they may be used in lieu of live testimony by Petitioners' counsel. See Stipulation, p. 17. The affidavits indicate that the reason for the conference call was "that [Petitioners] were trying to reach a mutually acceptable approach with the City by which enforcement of the City of Jacksonville's amortization ordinance against [them] . . . would be deferred pending the outcome of the appeal to the Eleventh Circuit." Petitioners' Exhibits KK and LL. During that call, counsel also advised the City's counsel that "there were [procedural] problems with the enactment of the subject Comprehensive Plan Amendment and that they would likely be filing challenges to its enactment." Id.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Community Affairs enter a final order determining that the plan amendment adopted by Ordinance No. 2010-401-E is in compliance. DONE AND ENTERED this 11th day of January, 2011, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of January, 2011.

Florida Laws (7) 120.569120.57163.3181163.3184166.04150.031847.0134
# 4
DEPARTMENT OF COMMUNITY AFFAIRS vs LEE COUNTY, 95-000098GM (1995)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 11, 1995 Number: 95-000098GM Latest Update: Dec. 09, 1998

The Issue Ultimately at issue in this case is whether certain comprehensive plan amendments, adopted by Lee County Ordinance No. 94-30, are "in compliance" with Chapter 163, Part II, Florida Statutes. As reflected in the Preliminary Statement, many of the subordinate issues raised by parties seeking to have the plan amendments found to be "not in compliance" have been withdrawn, and others have been stricken as not timely raised or for other reasons. The remaining issues are addressed in this Recommended Order.

Findings Of Fact The FLUM and the Overlay. Lee County adopted its first Comprehensive Plan with a land use map in 1984. On January 31, 1989, the County adopted an amended version of the 1984 Plan intended to plan for growth up to the year 2010 and to comply with the 1985 Growth Management Act requirements. Essentially, the 1989 Plan was very similar to that drafted in 1984. Some major differences were provision of development timing and concurrency, creation of the privately-funded infrastructure overlay, elimination of the fringe land use category, and a variety of other new goals, objectives, and policies (GOP's). Most of the land use categories in the 1984 Plan were carried forward to the 1989 Plan. Almost all of the land use categories are mixed land use categories that allow residential, commercial and in some cases also light industrial uses without any percentage distributions or other objective measurements of distribution among uses. The DCA took the position that the 1989 Lee Plan was not in compliance with the Growth Management Act and filed a petition under Section 163.3184(10). The Department's objection to the 1989 Plan flowed in large part from the alleged overallocation of land for development by the year 2010 that resulted from the categories in the future land use map series (FLUM). Using the County's data and analysis, the DCA concluded that the 1989 map provided for 70 years of growth, to the year 2060, instead of 20 years, to the year 2010. To resolve the 1989 Plan dispute, the County agreed to adopt a 2010 Overlay and create a Density Reduction/Groundwater Resource future land use (FLUE) category (DRGR). The 1989 Plan Compliance Agreement included the following provisions: Amend the Future Land Use Map series by designating the proposed distribution, extent, and location of the generalized land uses required by Rule 9J-5.006(4)(a)1.-9. for the year 2010. These designations will include acreage totals and percentage distributions (illustrated by a bar graph) for about 125 discrete sub-districts encompassing all of Lee County, which, once designated, shall be changed only by a formal amendment to the Lee Plan. The data for these designations shall be consistent with the Lee Plan's population pro- jections for the year 2010. This amendment shall be accomplished by the adoption of over- lay or sub-district maps for the entire County using the concepts developed therefor by Thomas H. Roberts of Thomas H. Roberts Associates and presented publicly to the Board of County Commissioners of Lee County on September 12, 1989, and to the Department of Community Affairs on September 22, 1989. Adopt a policy which will provide that no development approvals for any land use category will be issued in any of the sub- districts described above that would cause the acreage total set for that land use category in 2010 to be exceeded. In accordance with the 1989 Plan Compliance Agreement, the County created a 2010 Overlay. The County first projected future growth in Lee County to the year 2010, using a basic assumption that historic patterns of growth in Lee County, including historic densities, would continue. The County's 2010 population estimate was 757,370 for the entire unincorporated County. The County then assigned acreage allocations for different land uses allowed in each planning subdistrict. In accordance with the 1989 Plan Compliance Agreement, the County adopted the resulting 2010 Overlay, as well as a DRGR FLUE category with a density range of one unit per ten acres, as part of the 1990 remedial plan amendments. The Overlay consisted of Maps 16 and 17, which were added to the FLUM, along with implementing policies in the Future Land Use Element. The 2010 Overlay is, in the words of the 1994 Codification of the Plan, "an integral part of the Future Land Use Map series." Map 16 is a map which divides Lee County into 115 subdistricts. "Map" 17 is not a true map; it is a series of bar tables and pie charts that correspond to acreage allocations for land uses within the subdistricts. Each subdistrict is allocated a specific number of acres for each of the following land uses: residential, commercial, industrial, parks and public, active agriculture, conservation, passive agriculture and vacant. The land use acreage allocations for each Overlay subdistrict are the maximum amount of land which can be developed in that subdistrict. The intent of the 2010 Overlay was to match the amount of development that could be accommodated by the 2010 FLUM with the projected County-wide population for the year 2010. The 2010 Overlay accomplished this in part by assigning percentage distributions, in the form of acreage allocations, to the various uses in the many mixed use categories in the FLUM. Under the Overlay, once the acreage allocation for a particular land use is exhausted, no more acreage can be developed for that land use in that subdistrict unless the Lee Plan is amended. Policy 1.7.6 was adopted to establish an ongoing mandatory review procedure for evaluation and amendment of the 2010 Overlay. On September 6 and 12, 1990, Lee County adopted the 1990 Remedial Plan Amendments and officially revised the original data and analysis supporting the Plan. As the support documents for the 1990 remedial amendments stated: The future land use map series currently contained in the Future Land Use element of the Lee Plan depicts 18 land use categories and has an estimated 70-year population holding capacity. A future land use map series is re- quired by state law and is also a useful and necessary part of the plan in guiding land use and related decisions. The Year 2010 Overlay makes this map series even more useful as a decision-making guide by providing a 20-year horizon in addition to its present longer- term horizon. * * * In addition to this "pure planning" function of the 2010 Overlay, a regulatory function will be added. No final development orders or building permits for any land use category will be issued in any subdistrict that would cause the acreage total for that category in 2010 to be exceeded. The Dwelling Unit Counts and Projections charts in the support documents for the 1990 amendments demonstrate that the 2010 Overlay was designed to greatly limit the number of dwelling units that could be constructed by 2010 compared to the number allowed by the 2010 FLUM without the Overlay. On or about October 29, 1990, DCA published a Notice of Intent to find the 1990 Remedial Plan Amendments in compliance. However, a citizen challenge to the County's 1990 Remedial Plan Amendments resulted in an Administration Commission Final Order that the amendments were not in compliance and that the County had to take certain remedial actions to bring the Plan amendments into compliance. Final Order, Sheridan v. Lee Co. and DCA, 16 FALR 654 (Fla. Admin. Com. 1994)(the "Sheridan Final Order"). The Sheridan Final Order required the County to apply the 2010 Overlay at the development order stage, rather than at the building permit stage. As a result, no development order could be issued which caused the acreage allocations for any given individual subdistrict to be exceeded. The Sheridan Final Order also held that the County had not properly calculated the amount of development allowed by the 2010 Overlay and adopted the following analysis from the hearing officer's Recommended Order: The calculation of a density allocation ratio is part of the determination whether data and analysis support the residential densities in a plan. The analysis misses the point of the process if the maximum densities authorized by a plan are reduced to reflect historic densities. The question is whether the densities authorized by a plan are supported by data and analysis, not whether data and analysis support densities some- where between the maximum authorized densities and historic densities. Especially where historic densities reflect an inefficient use of land, as is clearly the case in Lee County, analysis of a plan based in part on historic densities invites the repetition of past planning failures. * * * The purpose of the density allocation calculation, as part of the process of determining if the plan is supported by data and analysis, is not to predict the actual density that will occupy the planning jurisdiction at buildout. The purpose of the density allocation calculation is to compare the maximum density allowed by the plan with the projected population, and consider the extent of the overallocation in the light of other factors in the planning jurisdiction, including plan provisions and relevant data and analysis. The ratio is not required to be 1:1 to satisfy the criterion of supporting data and analysis. But the ratio must be ascertainable in order to determine if the density allocations in a plan, in view of other plan provisions, are supported by data and analysis. Sheridan Final Order, 16 FALR at 689. As a result, one of the remedial amendments required by the Administration Commission was: To address the density calculation issue the County shall revise the data and analysis to include the maximum allowable densities in determining the amount of development allowed by the 2010 overlay and to show that the amount of development allowed is based on the expected growth. Sheridan Final Order, 16 FALR at 661. The County adopted 2010 Overlay remedial amendments in October, 1994. In December, 1994, the DCA determined that the remedial amendments were in compliance. (The revised data and analysis were not made a part of the record in this case.) On July 1, 1994, the County adopted an Evaluation and Appraisal Report (EAR) for its Plan and subsequently submitted to the DCA the EAR, along with the proposed EAR-based amendments for the year 2020. Among other things, the proposed EAR-based amendments eliminated the 2010 Overlay. Among other things, the DCA's Objections, Recommendations and Comments (ORC) Report objected to the elimination of the 2010 Overlay, taking the position that, without the Overlay, the EAR-based plan had the same allocation-related problems that had been in the 1989 plan. On November 1, 1994, the County adopted a modified version of the EAR- based amendments--still without any Overlay--and submitted these to the DCA, together with its staff response to the DCA's ORC Report. On December 28, 1994, the DCA issued a Statement of Intent to find the EAR-based amendments not in compliance. FLUM Population Accommodation Data and Analysis. The evidence in this case includes data and several different analyses comparing the population accommodated by the plan amendments at issue--i.e., the FLUM without any Overlay--with the population projected for the year 2020. Figure 14. Lee County's proposed population accommodation data and analysis is included in the EAR in Figure 14. Based on Figure 14, the County concluded that the 2020 FLUM accommodates 802,655 persons, or 128 percent of the projected 2020 population (an accommodation ratio of 1.28). Although the FLUM's many mixed use categories do not establish percentage distributions or other objective measurements of distribution among uses, Figure 14 assumes that certain percentages of the many mixed use categories will develop in residential use, based on historic growth patterns. Also based on historic growth patterns, Figure 14 assumes that residential density will be less than the maximum of the standard residential density range allowed in each category although the GOP's allow residential development at much higher densities. Since Figure 14 is based on historic patterns of growth that are expected to continue into the future, Figure 14 appears to predict future growth as accurately as is possible at this time. It probably is the best possible estimate of how Lee County will build out under the proposed amendments. However, the ability to make truely accurate predictions over such a long period of time--25 years--is questionable. Figure 14 assumes that only a fraction of the new Vested Community land use district (Lehigh Acres) will be developed by the end of the planning timeframe. Most of the Vested Community district consists of subdivisions which were approved and platted several years before the adoption of the earliest Lee Plan, and which are vested from the restrictions of the Lee Plan. The Vested Community district contains over 130,000 vested lots which can accommodate at least 271,700 residents. In addition, the Vested Community district contains some land which is not actually vested from the Lee Plan but is allowed to develop at four density units per acre (du/ac). Figure 14 assumes that 45,888 residential units accommodating 95,906 persons will be developed in Lehigh Acres by 2020. There is no goal, objective or policy in the Lee Plan which would prevent the development of more lots vested or allocated in the Vested Community district. Lee County's Figure 14 analysis assumed that the Rural and Outer Islands categories will develop at their maximum residential density of one du/ac. In fact, the Lee Plan includes a Planned Development District Option ("PDDO") which allows: landowners outside the Future Urban Areas to increase allowable densities for development that will be totally independent of county- subsidized facilities and services. (Objective 1.8) The PDDO increases the maximum theoretical residential density of the Rural and Outer Islands districts from 1 du/ac to 6 du/ac. However, due the requirements for use of the PDDO, realistically it cannot be anticipated that much Rural or Outer Islands land will utilize it. Lee County's Figure 14 analysis did not include any residential allocation for the General Interchange category. The General Interchange category allows residential development of 100 residential units at 8 du/ac for every 100,000 square feet of commercial development. If the residential option applied to all 1,436 acres of the General Interchange category, the Lee Plan would accommodate another 13,209 persons in that category. However, for the residential option, the category requires 160 acres under common ownership. Currently, there is only one case in which the requirement is met, and it is a development of regional impact (DRI) that does not allow residential at this time. Figure 14A. Figure 14A is part of the County's response to the DCA's ORC report. It was supposed to adjust Figure 14 by assuming the maximum residential density allowed by each land use category in accordance with the Sheridan Final Order. The Figure 14A accommodated population rises to 1,325,568, and the so-called allocation ratio rises to 2.11. Actually, Figure 14A does not take into account the actual maximum residential density in Intensive Development (22 du/ac), Central Urban (15 du/ac), and Urban Community (10 du/ac). Instead, it uses the top of the "standard density range" in those categories. Figure 14 B. Figure 14B also is part of the County's response to the DCA's ORC report. It adjusts the Figure 14A analysis by estimating the total residential development allowed by the Vested Community category at 170,732 dwelling units, which will accommodate 356,829 persons. Adding those Vested Community numbers to the Figure 14A numbers, Figure 14B estimates the population accommodated by the 2020 FLUM as 1,586,491 persons, or an accommodation ratio of 2.53. Maximum Theoretical Residential Potential. The DCA proposes an analysis of the data using maximum theoretical residential potential for each land use category. Under the DCA analysis, there is enough land available for residential development accommodate a population of approximately 2.5 million people--401 percent of the expected County population in 2020 or, expressed as a ratio, 4.01. In contrast to Figure 14B, the DCA's preferred analysis takes into account all of the residential development capacity in Lehigh Acres. In addition, it assumes residential development in the Vested Intensive Development part of the Lehigh Vested Community at the maximum density of 14 du/ac and in the Vested Central Urban part at the maximum density of 10 du/ac. These assumptions add to the FLUM population accommodation analysis the capacity to accommodate approximately 246,000 more people, over and above the Figure 14B capacity. The DCA's preferred analysis also assumes that all Rural and Outer Islands land will utilize PDDO and develop residentially at 6 du/ac. Use of this assumption more than doubles the population accommodation in those categories, adding approximately 500,000 people to the analysis. While theoretically possible, as previously stated, this assumption is unrealistic. The DCA's preferred analysis also assumes that 13,209 people are accommodated in residential development in the General Interchange category. This assumption, too, is theoretically possible but not realistic. Finally, the DCA's preferred analysis assumes that, although most of Lee County's future land use categories allow a mix of uses, the land will develop at the maximum potential residential densities over the entire land area--i.e., that no other type of permitted use, such as commercial, parks, schools or even roads would occur in any of the land use categories. Finally, it disregards the actual existence of non-residential uses and residential uses at lower densities; instead, it assumes redevelopment at the maximum potential residential densities over the entire land area. County's 2010 Overlay Analysis. It seems obvious that deletion of the 2010 Overlay must increase population accommodation, at least up to the year 2010. Up to the time of the final hearing, the DCA had not requested, and no party did, an allocation ratio analysis of the 2010 Overlay similar to the one the DCA prefers for the 2020 FLUM without any Overlay for purposes of making a comparison between the two. The County's chief planner testified that he performed such an analysis during the course of the final hearing using the maximum residential and maximum density assumptions. Neither the details nor the results of the analysis were clear. However, it appears to indicate that the 2010 Overlay accommodated a 2010 population of 1.06 million, apparently including 282,000 assumed to be accommodated in Lehigh Acres, an allocation ratio of 2.11. Assuming that the County's 2010 Overlay analysis included Lehigh, it can be roughly compared to the Figure 14B analysis and the DCA's preferred "maximum theoretical residential potential" analysis by removing the Lehigh component from each. Subtracting the Lehigh component from the County's 2010 Overlay population accommodation analysis results in a 2010 population accommodation of 778,000. Removing the Lehigh component from Figure 14B results in 2020 population accommodation of 1,229,662. Removing the Lehigh component from the DCA's analysis results in 2020 population accommodation of 2,008,927. Meanwhile, the County's projection of future increased by only about 70,000 between 2010 and 2020 for the entire unincorporated county. RGMC Alternative 2010 Overlay Accommodation Analysis and Comparision. RGMC proposes its own alternative analysis for comparing the population accommodated under the 2010 Overlay to the population accommodated without it. Using the County's population projection for 2020 of 626,860 in the unincorporated county and the accepted 2.09 people per unit, it can be estimated that approximately 300,000 units will be needed in the year 2020. Subtracting the 127,000 units existing in 1990, approximately 173,000 additional units will be needed over the 30 years from 1990 to 2020 to accommodate the expected population, or approximately 5,800 additional units per year. At that average rate, 116,000 units would be added by the year 2010 (5,800 units per year times 20 years). Adding the new units to the 127,000 units existing in 1990 results in a total of approximately 244,000 units in 2010. Since it is agreed that the Overlay was designed to accommodate, and accommodated, approximately the population expected in the year 2010, it can be estimated that the Overlay accommodated approximately 244,000 units. In the sense that all units accommodated under the 2020 FLUM without the Overlay are available for development before 2010, a rough comparison can be made between the population accommodated under the 2010 Overlay and the population accommodated according to the other analysis methodologies: according to Figure 14, the amended 2020 plan accommodates 384,045 units for the year 2020; according to Figure 14A, the amended 2020 plan accommodates 634,243 units for the year 2020; according to Figure 14B, the amended 2020 plan accommodates 759,086 units for the year 2020; and according to the DCA's preferred "maximum theoretical residential potential" methodology, the amended 2020 plan accommodates 1,201,973 units for the year 2020. Calculation and Use of the "Allocation Ratio". The technique of determining a residential density allocation ratio was described in an article entitled "Expanding the Overallocation of Land Use Categories," which appears in a June, 1995, publication of the Department of Community Affairs called "Community Planning." "Community Planning" is published by the Department of Community Affairs "to provide technical assistance to Florida's counties and cities and implement any requirements of Florida's growth management laws." The article announces how the Department reviews the question of "overallocation" in determining whether a plan is in compliance with statutory and rule requirements regarding urban sprawl. According to the article, the Department suggests that a comprehensive plan should allocate up to 125 percent of the amount of land needed to accommodate the projected future population. The article does not explain how the "allocation ratio" should be calculated. The Sheridan Final Order seems to say that maximum densities should be assumed. See Finding 11, above. But neither the "Community Planning" article nor the Sheridan Final Order indicate what other assumptions should be made. The "Community Planning" article and the Sheridan Final Order also do not specify whether, in calculating the allocation ratio, population accommodation capacity should be compared to the total expected population or to the incremental growth expected in the population. The DCA has accepted a 1.25 allocation ratio applied to the total expected population as being reasonable. A major treatise in this area known as Urban Land Use Planning, Fourth Edition, by Kaiser, Godchalk, and Chapin, suggests that an allocation ratio of up to 2.05 can be considered reasonable; however, when doing so, the authors were evaluating plans with a closer planning horizon (one to five years), and they were comparing the population accommodation capacity to the incremental growth expected in the population. When calculating an allocation ratio for a 20-year planning horizon, they suggest that a 1.20 allocation ratio that compares population accommodation capacity to the incremental growth expected in the population would be reasonable. By accepting a 1.25 allocation ratio that compares the population accommodation capacity to the total population expected on a 25-year planning horizon, the DCA seems to have been misapplying the allocation ratio analysis. Clearly, an accommodation ratio comparing the population accommodation capacity to the incremental growth expected in the population would be much than one comparing to to the total population expected. There was no data and analysis as to exactly how much higher, and it is difficult to say based on the record in this case. However, an example of the difference between the too methodologies is suggested by one of RGMC's alternative analyses. It is known that approximately 300,000 units of residential development will be needed for the population expected in the year 2020. See Finding 36, above. The evidence was that there were approximately 143,000 units existing in 1995, so approximately 157,000 additional units will be needed by the year 2020 to accommodate the expected population. Meanwhile, using the County's Figure 14 assumptions, the FLUM without the Overlay makes 384,045 units available for development by the year 2020, or an accommodation of an additional 241,045 units over what was in existence in 1995. Comparing incremental accommodation for growth to the incremental population growth expected by the year 2020 would result in an "accommodation ratio" of approximately 1.54, versus the ratio of 1.28 calculated in Figure 14 comparing to total population expected. By way of further examples, using the same method of comparison: Figure 14A's 2.11 "accommodation ratio" would become a ratio of 3.13, comparing incremental accommodation for growth to the incremental population growth expected by the year 2020; Figure 14B's 2.53 "accommodation ratio" would become a ratio of 3.92; and the DCA's "accommodation ratio" of 4.01 would become a ratio of 6.75. It should be noted that the Urban Land Use Planning treatise also speaks of the use of the allocation ratio as a safety factor to provide a choice of location for housing type and to avoid artificially increasing land and housing prices. Rather than being a device merely to avoid the overallocation of land, the safety factor also is said to be necessary to ensure that enough land is allocated and that the limitations of forecasting approaches do not exacerbate the need for affordable housing. It also should be noted that neither the "Community Planning" article nor the Sheridan Final Order specify that allocation and urban sprawl issues should be determined from the simple calculation of a residential density allocation. To the contrary, the Sheridan Final Order would indicate that, once the allocation ratio is obtained, full consideration should be given to all pertinent factors "in order to determine if the density allocations in a plan, in view of other plan provisions, are supported by data and analysis." Analyses Not Conducted. The plan amendments do not only eliminate the 2010 Overlay. They also decline to retain the Overlay concept and extend it another ten years to the year 2020. There is no data or analysis in this case comparing the population accommodated by the FLUM without any Overlay to the population that would be accommodated in the year 2020 if the Overlay were extended another ten years to 2020. Such data and analysis would most clearly illuminate the impact of eliminating the 2010 Overlay, and abandoning the Overlay concept, on the residential allocation of the plan for the year 2020. There may be tens of thousands of, up to perhaps almost a hundred thousand, residential units in DRI's that have been approved but not yet built. There was inadequate data and analysis of how many of the residential units that will be needed by the year 2020 can be supplied in these DRI's. Lehigh Acres. Clearly, Lehigh Acres presents a special problem for Lee County and the DCA. Lehigh Acres was platted in the 1950s and 1960s. It covers approximately 97 square miles, which is slightly more than 62,000 acres. Since its inception, Lehigh has had all the attributes of urban sprawl. It is a large, sprawling, almost entirely residential community that was created in an area remote from urban services. It is characterized by grid patterns of development, a poorly-designed transportation network with large numbers of small local roads and no four-lane roads, huge amounts of land allocated to residential development and a relatively small amount of land allocated to commercial development. The roads in Lehigh are built. Virtually all of Lehigh has been subdivided into relatively small single family residential homesites, and almost all of these homesites have been sold to buyers all over the world. By virtue of the platting and sale of the land into homesites, Lehigh is a vested community. Over the years, the County has considered a number of potential solutions to the Lehigh Acres dilemma. Ultimately, the County decided to take a multi-pronged approach: (1) creating restrictions on additional subdivision and attempting to reduce densities to no more than four units per acre; (2) continuing the privately-funded infrastructure overlay as the means of providing infrastructure in Lehigh; and (3) utilizing sector planning to work toward a better transportation system and larger areas of commercial allocation to create a more balanced community. Based on the new treatment of Lehigh Acres, the County engaged in different assumptions about how Lehigh will build out. In 1989, Lehigh was shown as "central urban" and "urban community," together with the rest of the Lee Plan future land use categories. Under the 2010 Overlay, the County purported to reduce acreage allocations in Lehigh, but in fact there was little impact on residential potential due to vesting. In the EAR-based amendments, Lehigh is shown under "Vested Community," a separate land use category. Through the vested community category, the County attempted to restrict additional subdividing of lots and, with a few limited exceptions, set a maximum density of four units per acre. Based on the different treatment of Lehigh in the Plan, the County projected a population for Lehigh based on the amount of growth actually expected to occur by Year 2020. To do this, the County utilized eight different methodologies and averaged the projections to come up with a 2010 population for Lehigh of 95,906. These assumptions are reflected in the County's Figures 14 and 14A. Neither the Department's rules nor the "Community Planning" article provide specific guidance as to how vested areas are to be treated in making a calculation of a plan's "allocation ratio." The vast area of Lehigh has the capacity to absorb virtually all the anticipated future population growth in unincorporated Lee County through the year 2020. In fact, it may be appropriate for Lee County to increase overall density in Lehigh if necessary to support the infrastructure and transportation needed to convert Lehigh Acres into a more balanced, multi-use development. Lee County's approach to Lehigh essentially was to attempt to satisfy the Department's desire for an acceptable "allocation ratio" by estimating how many residents will actually live in Lehigh by 2020, assuming the Plan's treatment of Lehigh, and treating those estimates as Lehigh's population accommodation. By studying historic rates of growth, the Lee Planning Division believes that number will be approximately 96,000 people. No evidence was presented by the Department or any intervenor in contradiction of this estimate. The results of the County's approach to Lehigh are reflected in the County's Figures 14 and 14A. Another approach would be to attempt to reduce residential development in other parts of the County. It would be poor planning to reduce densities "across the board" throughout the County just to achieve a lower allocation ratio. Such an approach could direct population concentration away from urban areas into poorly-served rural areas, thereby discouraging the efficient use of land and encouraging sprawling uses. Depending on the densities, it could direct growth to remote areas of the county. Additionally, if Lee County attemped to limit residential growth based on incorrect assumptions regarding future densities, it could seriously underallocate land uses. Underallocation can greatly inflate land costs to the detriment of the general public. On the other hand, a better approach might be to couple sector planning in Lehigh with a reduction in densities in certain other parts of the County. If successful, such an approach could both create more balanced development in Lehigh Acres and direct future growth to Lehigh and away from coastal high hazard areas (CHHA), DRGR and other environmentally sensitive areas, and Open Lands and Rural land (especially rural lands not situated so as to be potential future urban infill or expansion), including important wildlife habitat. Commercial Allocations. The 2020 Lee Plan, without the 2010 Overlay, has some guidance for the location of commercial development, especially retail commercial. But it does not have percentage distributions or other objective measurement of the distribution of commercial and other uses allowed in its many mixed land use districts. Policy 6.1.2 of the 2020 Lee Plan consists of site location criteria which apply to retail commercial development, such as shopping centers, restaurants, gas stations, and other commercial development generating large volumes of traffic. Non-retail commercial development, such as office, hotel and motel or wholesale commercial development, may be developed at the identified intersections or anywhere else in the land use categories which allow commercial development. Even retail commercial can be developed at locations which do not meet the location criteria under discretion granted to the Board of County Commissioners. According to Lee County's EAR, the Commercial Site Locations Standards Map (Map 16) identifies 52 full intersections and 15 half-moon intersections which comply with the site location standards for Community Commercial and Neighborhood Commercial. They represent 9,520 acres of land designated for retail commercial development. Using the standard planning conversion rate of 10,000 square feet per acre, average, there is room for approximately 95,000,000 square feet of commercial development in the commercial sites depicted on Map There also may be other intersections which meet the criteria for Community Commercial or Neighborhood Commercial but are not shown on Map 16. In addition, there are numerous intersections which meet the criteria for Minor Commercial which are not shown on Map 16. Map 16 also does not include Regional Commercial development. The report by Thomas H. Roberts & Associates on Commercial Land Use Needs In Lee County (Jan. 10, 1987), indicates that the retail space ratio in Lee County is 26 square feet per capita. Just counting the 95,000,000 square feet of retail commercial development allowed in the land shown on Map 16, the 2020 Lee Plan has enough retail commercial capacity to accommodate 3.7 million people. Without even considering the non-retail commercial uses that can be developed at any location in the several land use districts which allow commercial uses, or the unknown amount of retail commercial that can be developed at the numerous intersections which meet the Minor Commercial location criteria, the 2020 Lee Plan without the 2010 Overlay allows commercial development far in excess of the amount needed to accommodate the projected 2020 population. Industrial Allocation Policy 7.1.4 in the 2020 Lee Plan provides: The [FLUM] shall designate a sufficient quantity of land to accommodate industrial development that will employ 3 percent of the county's population in manufacturing activities by the year 2010. The 2020 FLUM, without the 2010 Overlay, designates 6,062 acres in the Industrial Development category. Three percent of the 2020 County population represents approximately 19,000 people. The 1984 Roberts industrial land analysis for Lee County suggested a ratio of seven industrial workers per acre for industrial related activities. Most industrial land uses employ more workers per acre, and the national average is about 17 employees per acre. But even using the ratio suggested by the Roberts analysis, Lee County would need only approximately 3,000 acres of industrial land to accommodate three percent of the 2020 County population in industrial employment. Analysis in the EAR indicates that enough additional industrial land is needed to serve the needs of municipal populations that probably cannot or will not be supplied within the cities themselves and that this additional land accounts for the apparent excess in industrial lands allocated in the county. However, it is not clear from the data and analysis how this determination was made. In addition, light industrial development is permitted in several other mixed land use categories. For example, the existing approximately 2,800 acres of Airport Commerce (AC) located to the northwest of the airport is intended to include light industrial activities. There was no data or analysis as to how much additional industrial use will be made of land in those categories. There are no percentage distributions or other objective measurements of the distribution of land uses in the mixed land use districts that allow light industrial use. The Mixed Land Use Districts. As has been seen, the Lee Plan without any Overlay makes extensive use of mixed land use districts without percentage distributions or other objective measurements of distribution among uses. Much of the dispute between the parties as to residential accommodation and allocations of land for commercial and industrial uses results from the lack of percentage distributions or other objective measurements of distribution among uses in the plan's mixed land use categories. Although the County predicts development of only a percentage of these districts as residential, it remains possible for much larger percentages to be developed residential. On the other hand, it is possible for practically all of mixed land use districts to develop commercially or even industrially. The 2010 Overlay attempted to address the lack of percentage distributions or other objective measurements of distribution among uses in the plan's mixed land use districts by limiting the acreage that could be developed in particular uses by the year 2010. Without the Overlay concept, no percentage distributions or other objective measurements of distribution among uses remain in the plan. Because of the plan's extensive use of mixed use districts, the County's ability to control development through the plan is seriously undermined. Other Urban Sprawl Considerations. Unincorporated Lee County contains approximately 685 square miles. Lehigh Acres and the DRGR areas, combined, are approximately 199 more square miles, 29 percent of the total area of unincorporated Lee County. Except for the growth that will occur in the Vested Community of Lehigh, much of the future growth in Lee County will occur in the I-75, U.S. 41 corridor, which is oriented in a generally North-South direction and contains most of the urbanized areas of the County, including the City of Fort Myers. Because this area is already largely urbanized, most of the growth in it will result in either the expansion of existing urbanized areas or in-fill between existing urban areas. Certificated water and sewer franchise areas also generally coincide with the north/south urban core in which growth is expected to continue. The presence of water and sewer franchise areas in the north/south urban core and in Lehigh Acres encourages utilization of these areas through the ability to provide urban services. The absence of water and sewer franchise areas in other portions of the County will act as a hindrance to development in areas which are undeveloped and either in conservation or agricultural use. A review of County DRI approvals, together with approved development orders, also appears to indicate a trend toward development in the north/south core. The absence of development orders in most of the outlying areas, indicated as either agricultural, vacant, or conservation use, indicate that probably relatively little growth will occur in those areas. Platted subdivisions also appear to show a trend toward development in the north/south urban core. In general, there also appears to be a correlation between existing land uses and those factors which can reasonably be expected to establish future growth trends in the north/south urban core. Growth in the north/south I-75, U.S. 41 corridor across the county line to the south in Collier County tends to encourage similar growth at the southern end of Lee County. Meanwhile, there are hindrances to development across the county line to the east and southeast by virtue of the presence of agricultural lands and regional wetland systems such as the Corkscrew Swamp and the Everglades. The County has also made use of sector planning. The County's sector plans represent extensive and detailed planning studies which in many cases are reflected in both the FLUM and the policies in the Plan. However, currently there is no sector plan for Lehigh Acres. Policy 1.5.5, creating the Vested Community category for Lehigh, states a sector plan for Lehigh will be developed beginning in 1996. In terms of land uses, the Plan seems to be fairly well functionally related, both in terms of what is shown on the FLUM and the relation between the FLUM and the Plan policies themselves. A good example of this is the commercial site location standards, which establish a strong functional relationship between transportation and regional commercial facilities. There is also a good functional relationship between existing land uses. The Plan mixed use categories appear to recognize and attempt to encourage sound functional relationships between home, work, and shopping. The Plan also has compatibility standards that help maintain functional relationships. However, without the Overlay, the many mixed use categories in the Plan do not contain a percentage distribution or other objective measurement of distribution among mixed uses within the mixed use districts. In terms of land use suitability, the County generally appears to be designating for development those areas which are most suitable for development. However, because it allows development of all kinds throughout the County in excess of what is needed by 2020, the Plan allows development in less suitable areas. A variety of methodologies and assumptions leads to the conclusion that the Lee Plan generally is an urban development plan, not a rural development plan. For instance, under the Figure 14 methodology, 80 percent of the population is directed toward urban land uses, and 12 percent into rural. Under Figure 14B, which unrealistically assumes that all of Lehigh Acres will be built out within the planning time frame, 90 percent of the population is directed to urban areas, and only 10 percent to rural. Even assuming that 100 percent of the land will be used for residential purposes, and that all of Lehigh will build out within the planning time frame, 92 percent is directed to urban areas, and only 8 percent to rural. Finally, even assuming 100 percent of the land to residential at maximum densities, and also that all rural land uses will use the PDDO option at six units per acre, only 4 percent of the population will be directed to rural areas in the FLUM. Notwithstanding the overall patterns of growth in Lee County, it clearly is indicated in the Sheridan Final Order that land in Lee County historically has been used inefficiently and that, without the Overlay, the plan allows inefficiency to continue unabated. This is due in large part to the extensive use of mixed land use categories that do not contain a percentage distribution or other objective measurement of distribution among mixed uses within the mixed use districts, together with the overallocation of land that also results in part from their use. By comparing the FLUM's since 1984 with the current Existing Land Use Map (ELUM) (Lee 56), it is apparent that rural designations have not preserved agriculture. Significant parts of county that have been designated rural since 1984 actually have been developed residential or non-agricultural use. In Range (R) 25 East (E), Township (T) 45 South(S), Sections 31 and 32 are residential, while 33 is a golf course. Similarly, R 25 E, T 47 S, Sections 14, 15 and 23 have developed significantly residential and part of Section 14 is now designated Outlying Suburban. In addition, significant residential development has occurred in areas of Pine Island that have been designated rural since 1984. On the other side of the coin, much of the "New Community" still is in rural use (R 35 E, T 45 S, Sections 1, 2, 3, parts of 10, 11, and 12; R 26 E, Sectons 5-8, 17 and 18.) Some "Industrial Development" land is actually still in rural use or vacant--R 25 E, T 46 S, Section 3 west of I-75, and Sections 4- There is significant land that actually is rural or vacant adjacent to wetlands and Estero Bay in R 24 E, T 45 S (Sections 28, 29, and 31-35), together with Sections 3-5, 8-10, and 15 in R 24 E, T 46 S, that are designated for Suburban or Outlying Suburban uses. Land designated rural, open land or fringe in 1984 has been redesignated for urban uses over the years. A large block straddling Daniels Parkway east of the 6 Mile Cypress Strand has been designated Outlying Suburban. Approximately between Buckingham Road, Orange River Boulevard and I-75, rural land has been redesignated as Rural Community Preserve. Large blocks of land, one at the extreme north end of the county between U.S. 41 and I-75, and the other east of I-75 near the river, have gone from rural to Outlying Suburban. A large amount of what was rural and fringe between Bonita Springs and San Carlos Park, west of U.S. 41, has become Suburban and Outlying Suburban. CHHA and Hurricane Evacuation and Shelter. Objective 75.1 of the amended Lee Plan defines and delineates Coastal High Hazard Areas (CHHA) for the first time. Previously, the plan referred to the Federal Emergency Management Agency (FEMA) "A Zone," which encompasses somewhat more land than the new CHHA. Policy 75.1.4 of the amended Lee Plan, which formerly applied to the "A Zone," states: Through the Lee Plan amendment process, land use designations of undeveloped areas within [CHHA] shall be considered for reduced density categories (or assignment of minimum allowable densities where density ranges are permitted) in order to limit the future population exposed to coastal flooding. In this round of amendments, the County did not consider either reducing density categories, or assigning the minimum allowable densities in categories with a range of densities, in undeveloped land in the CHHA. In prior rounds of amendments, the County reduced densities in areas that would be inundated by Category 1, 2 and 3 hurricanes (which would include CHHA). Assuming maximum allowable densities together with the other Figure 14A assumptions, the density reductions reduced population accommodation by 13,000 units in those areas. Elimination of the 2010 Overlay opened additional land to immediate development in the CHHA. There was no data and analysis on the amount of new land opened to immediate development or the additional population accommodated in the CHHA that would result. Goal 79 in the Lee Plan, as amended, is to "provide evacuation and shelter capabilities adequate to safeguard the public against the effects of hurricanes and tropical storms." Objective 79.1 of the Lee Plan, as amended, is to restore evacuation times to 1987 levels by 2000, and to reduce the clearance time portion of evacuation time to 18 hours or less by 2010. Previously, the plan's objective was to achieve 1987 evacuation times by the year 1995. Lee County has among the best hurricane planning efforts in southwest Florida. Nonetheless, as of the time of the final hearing, evacuation times still exceeded 1987 levels, and clearance times exceeded 18 hours. Little progress had been made toward the previous objective to achieve 1987 evacuation times by the year 1995. That is why the objective was extended five more years until the year 2000. It may be that the 2010 Overlay was not designed with hurricane evacuation times in mind. It also is true that the County's evacuation plans are updated every three years based on actual development data. But it also is true that additional development in the CHHA due to elimination of the 2010 Overlay may make it more difficult to achieve Objective 79.1, even as amended. Objective 79.2 of the Lee Plan is to make adequate shelter space available by the year 2010 "for the population in the Hurricane Vulnerability Zone at risk under a Category 3 storm." There was no data and analysis of the impact of eliminating the 2010 Overlay on the County's ability to achieve either Objective 79.1 or Objective 79.2. There also was no data and analysis of the impact of amending Objective 75.1 and 75.1.4 to reduce the size of the coastal area subject to consideration for land use density reductions on the County's ability to achieve either Objective 79.1 or Objective 79.2. Change of Alico Property from DRGR to AC. Another significant FLUM amendment in the EAR-based amendments was to change the designation of 1400 acres of property owned by Alico, Inc., from DRGR to Airport Commerce (AC). Uses allowed in the AC district include light manufacturing and assembly, warehousing, distribution facilities, ground transportation and airport related terminals or transfer facilities, and hospitality services. Suitability. Policy 1.4.5 of the plan, as amended, defines DRGR as "upland areas that provide substantial recharge to aquifers most suitable for future wellfield development" and as "the most favorable locations for physical withdrawal of water from those aquifers." Although previously designated DRGR, more recent data and analysis calls this designation into question. The amendment property does provide some recharge to both the water table (surficial) aquifer and the underlying Sandstone aquifer, but it does not provide above-average groundwater recharge for either aquifer (or any recharge to any of the deeper aquifers). In addition, it is not a good site for the development of a wellfield in either the water table or the Sandstone aquifer. The water table aquifer is not especially thick, and there are too many wetlands on the site for production from the water table aquifer. (Pumping from the water table aquifer next to the airport also could be problematic in that the stability of the soil under the airport could be affected. (Cf. Finding 100, below.) In the Sandstone aquifer, groundwater flows away from the site, making it unsuitable for production. Despite the questions raised by the new data and analysis, the amendment property may still be suitable for designation as DRGR. But that does not necessarily make it unsuitable for AC use. In terms of location, the amendment property is perfectly suited to AC use. I-75 and other AC-designated property is to the immediate west of the amendment property. The Southwest Florida International Airport is to the immediate north of the amendment property. A second runway and a new cargo handling facility are planned for construction to the south of the existing airport runway. When built, the new facilities will practically be touching the northern boundary of the amendment property, and the proposed new south airport access will cross the amendment property and intersect Alico Road, which is the southern boundary of the amendment property. Commercial and industrial use on the property would not pose an unreasonable threat to contaminate either existing or future potable water wells. Theoretically, stormwater from the amendment property could contain contaminants which could eventually migrate to a drinking water well. But the threat of such contamination is small. Permitting criteria adopted and imposed by the South Florida Water Management District will require all construction on this site to conform to surface water quality standards through Chapter 373, Florida Statutes, and permitting rules of the Water Management District within Chapter 40, Florida Administrative Code. These rules will require on-site detention and retention of stormwater which will greatly reduce the threat of surface contaminants leaving the property. Additionally, all surface water runoff from the property, and most groundwater, will be intercepted by the Alico Road Canal, which drains in a westerly direction away from any existing drinking water wells. If any contaminants from the amendment property were to enter the groundwater, avoid the Alico Road Canal and leave the property, they would have to migrate a considerable distance to reach a potable water wellhead. The only wellfield pumping, or planned to pump, from the water table aquifer which contaminants possibly could reach would be the existing Gulf Utilities wellfield approximately one mile and a half southeast of the amendment property. Contaminants within the groundwater move at a slower speed than the water itself. Most contaminants move at a much slower speed than the water. Thus, the chances are very slight that contaminants from the amendment property would threaten the Gulf Utilities wellfield. Any metals in the groundwater would attach to soil particles and migrate extremely slowly. Other potential contaminants would eventually break down within the soil as they slowly migrated away from the site. It was estimated that the travel time from the closest portion of the amendment property to the Gulf Utilities well field would be in the neighborhood of 50 to 100 years. If any such contaminants did reach the wellfield they would be in such dilute concentrations that they would pose no health hazard. The only other wellfield that is reasonably close to the proposed site is the Florida Cities well field to the northeast. This wellfield taps the Sandstone aquifer. The Sandstone aquifer is separated from the water table aquifer by an approximately 40 foot thick semi-confining layer. This layer is composed of silt and clay which provides hydraulic separation between the aquifers. There are no known breaches of the semi-confining layer in this area. The direction of flow and the nature of the semi-confining layer also make it extremely unlikely that contaminants from activities on the amendment property and discharged from the site by stormwater could migrate to the Florida Cities water wellfield. The groundwater in the water table aquifer flows generally southwest, and the confining layer has low leakance values. Additionally, safety measures required for the development of the amendment property include the installation of monitoring wells and the requirement to use the best environmental management practices. The data and analysis includes panther sitings in the vicinity of the amendment property. There also is evidence that the amendment property is part of land that has been labeled as "Panther Priority 2." The significance of this label was not clear from the evidence. In any event, while part of the "Panther Priority 2" land, the amendment property clearly also is surrounded by uses not particularly suited for panthers. Currently, rock mining is occurring on property to the east and to the south of the amendment property. Rock mining on the amendment property itself also is allowed under its previous DRGR designation. The airport is immediately to the north, and both other AC property and I-75 are immediately to the west. In light of those developments, the "Panther Priority 2" designation does not make the amendment property unsuitable for AC designation. Need. The County has a legitimate need to diversify its economy so that it is not so dependent on tourism. It is the County's perogative to attempt to develop its regional airport into an international trade center. In view of the suitability of the amendment property for AC, and its projected role in furthering the County's plans to develop its regional airport into an international trade center, the amendment property should be viewed as a valuable economic resource in need of protection. It is appropriate, when trying to protect a resource, to plan for the needs of generations to come. If the amendment is not approved, there is a good chance that the land eventually will be used for a rock mine. Residential use in that location is incompatible with airport noise. A public gun range is a permissible use of DRGR property, but there are no plans for a public gun range on the amendment property, and such a use also would not be compatible so close to the airport and would be unlikely. Although agricultural use as pasture is possible, ultimate use of the property for pasture seems less likely than rock mining. As previously mentioned, the land immediately to the east of the subject parcel and to the south of the subject parcel is being utilized as rock pits. If the amendment property eventually is used for rock mining, the land would be excavated into what becomes deep lakes. In all likelihood, such a use would permanently preempt the land in question from being a commercial resource that could be utilized in conjunction with the airport. Of the 1400 acres of amendment property, approximately 800 acres are jurisdictional wetlands; only about 600 acres of uplands actually can be used for AC purposes. Meanwhile, approximately 173 acres of industrial land has been rezoned to other uses within Lee County between 1990 and the date of the hearing. Another 300 acres of AC are to be incorporated into the new airport expansion. But there was no data or analysis as to how much of those 473 acres consist of wetlands. Utilizing the 1984 Roberts methodology, the County has analyzed the need for industrial land in the County and has concluded that the addition of the amendment property is necessary to meet those requirements. However, as previously mentioned, it is not clear how the County's analysis was conducted or what the actual needs for industrial land in the County are. In addition, several mixed land use categories permit light industrial use but do not establish percentage distributions or other objective measurements of the distribution among the mixed uses within those categories. Taken as a whole the data and analysis does not establish that the AC amendment is necessary to meet the need for industrial land in the County. Adequate data and analysis to establish those needs is necessary to determine whether other land where industrial use is permitted should be redesignated if the AC amendment is to be adopted. As previously discussed, Lee County has much more land designated for commercial development than will be needed to accommodate the projected 2020 population. See Findings 58-68, above. In support of their position that the AC map amendment is needed in order to meet the demand for airport-related industrial and commercial development that will be generated by the expanding Southwest Florida International Airport, Lee County and Alico point out that international airports serve a larger area than a single County, and that a larger AC district near the Airport will serve the Southwest Florida region. With its new runway and larger terminal with new cargo handling facility, the Airport Authority intends, and the County would like to encourage, a large increase in airfreight handled by the Airport by 2020. Alico prepared a Response to DCA's ORC, which attempted to compare the acreage of approved, large-scale commercial and industrial development near the Orlando International Airport to the amount of acres proposed for Airport Commerce near the Southwest Florida International Airport. However, the Alico Response failed to take into account the amount of approved development near the Orlando Airport which is vacant. According to the Alico Response, the Orlando International Airport handled 233,587 tons of airfreight in 1994. Also according to the Alico Response, 7,152 acres of industrial and commercial development, including ten DRI's, are located near the Orlando Airport. The ten DRI's located near the Orlando Airport include 55,464,770 square feet of approved industrial and commercial development. But as of June of 1995, only 3,386,744 square feet of industrial and commercial development, or 6.11 percent of the approved industrial and commercial square footage, had been constructed. Applying the percentage of approved industrial and commercial in DRI's actually developed by 1995 (6.11 percent) to the acreage approved for industrial and commercial (7,152 acres), it can be determined that 440 acres of existing industrial and commercial development were supporting the 233,587 tons of airfreight handled by the Orlando Airport in 1994. Based upon the Orlando Airport experience, it would appear that each acre of industrial and commercial development near an airport supports 534.54 tons of airfreight each year. The Southwest International Airport projects that 196,110 tons of airfreight will be handled by the Airport by 2020. Dividing the projected 2020 tonnage by the 534.54 tons of airfreight per acre from the Orlando Airport experience, it would appear that the air freight activities projected for the Southwest Florida International Airport by the year 2020 will support only about 367 acres of AC. The Lee Plan FLUM already includes approximately 2800 acres of AC located to the northwest of the Airport. (It is not clear whether the 300 acres consumed by the runway expansion should be deducted from the 2850 acres of AC said to currently exist.) The existing AC district is essentially undeveloped. The AC which already exists to the northwest of the Airport is more than sufficient to support the airfreight which the Airport expects to handle by 2020. Zemel FLUM Amendment. Background. The Zemels own approximately 8600 acres of land in northwest Lee County. The 1990 Comprehensive Plan amendments which resulted from the settlement between Lee County and DCA, designated Zemel property as DRGR with a residential density of one unit per ten acres. The DRGR designation for the Zemel property was determined to be in compliance with the Growth Management Act. Zemel v. Lee County & DCA, 15 FALR 2735 (Fla. Dept. Comm. Aff. 1993), aff'd, 642 So. 2d 1367 (Fla.1st DCA 1994). Based in part on data and analysis which were not available at the time of adoption of the DRGR category, a circuit court determined that the Zemel property did not meet the criteria for inclusion in the DRGR category. The circuit court ordered that: The property is hereby restored to the Rural land use classification on the Future Land Use Map of the Lee Plan, including restoration of the subject property's density to 1 du/acre and use of the Planned Development District Option for the property. This action shall not preclude the County from amending its plan, including the 2010 Overlay, as it pertains to the Zemel property, pursuant to Chapter 163, Fla. Stat., subject to constitutional limita- tions and other requirements of law. Placement of Zemel Property in Open Lands Classification The 1994 EAR-based amendments changed the land use designation of the Zemel property to Open Lands. Open Lands is a new category created by the EAR- based amendments in Policy 1.4.4. The residential density allowed in the Open Lands category is one unit per ten acres, except a density of one unit per five acres is permitted if the planned development process is used to prevent adverse impacts on environmentally sensitive lands (as defined in Policy 77.1.1.4). (Commercial and industrial uses are permitted in the Open Lands category in accordance with the standards in the Rural category.) Of the 8,600 acres owned by Zemel, approximately 1,900 acres are wetlands and 6,700 acres are uplands. Lee County chose the Open Lands category for the Zemel property because it was the least intensive land use category available after the circuit court determined that the DRGR category was not appropriate, and because the County did not wish to exacerbate the overallocation of the FLUM. According to new Policy 1.4.4: Open Lands are upland areas that are located north of Rural and/or sparsely developed areas in Township 43 South. These areas are extremely remote from public services and are characterized by agricultural and low-density residential uses. It was not proven that the Zemel property does not meet the Policy 1.4.4 definition of Open Lands. The Zemel property clearly is in Township 43 South. It is north of areas that can be said to be "sparsely developed." The Zemel property clearly is characterized by agricultural use. Finally, although some of the Zemel property is not "extremely remote" from some public services, all of the Zemel property can be said to be "extremely remote" from at least some public services, and some of the Zemel property can be said to be "extremely remote" from all public services. Placement of the Zemel property in the Opens Lands category was based on adequate data and analysis. To the extent that data and analysis in the EAR may have been lacking, the evidence at final hearing included adequate data and analysis. Using the Figure 14 methodology, the County calculated that Open Lands category would accommodate 2,073 people, as compared to 8,293 people at the Rural density. However, assuming development of all of the Zemel property at the one du/ac standard density allowed by the Lee Plan for Rural, 14,003 people (1 du/ac x 6700 upland acres x 2.09 persons/unit) would be accommodated. In the case of the Zemel property, such an assumption would be less unrealistic than in many other parts of the County since it is a large, vacant tract. The evidence also was that the Zemel property is one of the few parcels of land in the County in which use of the PDDO is a realistic possibility. Assuming maximum densities under the PDDO, the Zemel property under the Rural designation could accommodate 84,018 people (6 du/ac x 6700 upland acres x 2.09 persons/unit). Under the Open Lands category, even at the maximum density allowed for planned developments, the Zemel property could accommodate only 2,801 people (1 du/5 ac x 6700 upland acres x 2.09 persons/unit). Dependence of Open Lands on Deletion of Overlay Section 10 of the Lee County Ordinance 94-30, which adopted the plan amendments in issue in this case, purported to defer, until after the conclusion of these proceedings, the decision as to which adopted plan amendments would become effective. Although all of the parties now agree that the attempted deferral of this decision was "ultra vires," the evidence was that one purpose of Section 10 of the ordinance was to insure that intended packages of amendments would remain together and either become effective together or not at all. Specifically, there was evidence that the amendments to the FLUM and to FLUE Policy 1.4.4, changing the land use designation of certain property to "Open Lands," was intended to remain together with the amendments which delete the FLUM 2010 Overlay, and to either become effective together or not at all. Otherwise, there would be no development authorized in property redesignated "Open Lands" because there was no land use category called "Open Lands" at the time of adoption of the 2010 overlay, and no express authorization for development of any kind in "Open Lands." Planning Timeframe. Clearly, the EAR-based Lee Plan amendments are intended to plan through the year 2020. The year 2020 was chosen for the amendments to enable the County to make use of the best available demographic projections being generated by the Metropolitan Planning Organization for that time frame. The Parks, Recreation and Open Space Element of the plan, as amended, retains Map 11. Map 11 depicts "Future Recreational Uses within Generalized Service Boundaries." It is the map that was generated in 1989 and used in the 1989 and subsequent plans for the year 2010. However, it was not proven that the map does not accurately depict "Future Recreational Uses within Generalized Service Boundaries" for the year 2020. The County concedes that the Community Facilities and Services Element of the plan, as amended, projects waste generation and recycling rates only from 1991 to 2015. The County contends that these projections are easily extrapolated to the year 2020, and no party disputes this. The County's response to the DCA's ORC report indicates that the Hurricane Shelter/Deficit analysis for the Conservation and Coastal Management Element is for shelter needs to the year 2000. However, the County cannot accurately project shelter needs much further in the future. The evidence is that the better practice is to plan for shorter periods of time and continually update the projections. This is what the County does. It was not proven that the County is planning for the wrong timeframe or that its plan is defective for that reason. Other alleged uses of the wrong planning timeframe actually arise from questions as to the allocation of land to meet the needs of the County through the year 2020. There is no question whether the County's intent is to plan for the year 2020. The dispute is whether land has been overallocated. Other Alleged Internal Inconsistency. Amended Objective 100.1 in the Housing Element uses data for the County, including municipalities, in projecting the number of housing units needed for the 2020 timeframe. It is true that EAR Figures 14, 14A and 14B, which analyze the FLUM, identify the number of units which may be accommodated for the unincorporated area. But EAR Figures 12 and 13, which also analyze the FLUM, are directed to the entire county, including municipalities. Besides, it is clear that the County understands its obligation is only to implement affordable housing with respect to the unincorporated county. Water Supply. The Regional Water Supply Master Plan (RWSMP) serves as supporting data for several amended policies in the Potable Water sub-element of the Community Facilities and Services Element. The purpose of the RWSMP was to ensure an adequate, reliable and cost-efficient supply of potable water to meet the current and future needs of Lee County to the Year 2030 and beyond, considering both economic and environmental factors. The County's reliance on implementation of the RWSMP for this purpose is justified. Preparation of the plan was a very complex undertaking. In preparing the population projections on which the Regional Water Supply Master Plan relies, the County's consultant attended the technical staff meetings of the individuals with the Metropolitan Planning Association (MPO) charged with preparing the MPO population projections. The MPO Countywide population projections utilized in the RWSMP were prepared by estimating the number of permanent residents and taking into account a number of other economic characteristics and social characteristics such as the number of children per household, historic and expected natural and State trends, and the degree to which these trends will affect the future of Lee County. The Lee Plan, as well as the Comprehensive Plans of the other governmental jurisdictions in Lee County, were utilized in preparing the RWSMP. It was a plainly spelled out requirement for preparation of the Master Plan that it had to be consistent with the Comprehensive Plans of the County and cities in Lee County. The MPO population projections are reasonably accurate, and they are the best available data for purposes of planning water supply. The MPO projections are preferable to the "maximum theoretical" population accommodation used in the DCA's residential allocation analysis. Regardless of the appropriate analysis for purposes of determining whether a plan overallocates land, it would not be appropriate to plan water supply based on unrealistic population projections. The RWSMP uses MPO 2020 population projections that are somewhat different from, but reasonably close, to the 2020 population projections reflected in Figure 14 and used to support the FLUE of the Lee Plan. The special purposes of the RWSMP projections justify the differences. Besides, the differences are not large enough to prove beyond fair debate that the plan is not internally consistent. Wetlands Protection. Prior to the County's adoption of the EAR-based amendments, Goal 84 in the Conservation and Coastal Management Element of the Lee Plan and its objectives and policies included guides for local land development regulations in the protection of wetlands by establishing allowable land uses and their densities, and by establishing design and performance standards for development in wetlands. The County modified Policy 84.1.2 (renumbered 84.1.1) in part by deleting a prohibition against the construction of ditches, canals, dikes, or additional drainage features in wetlands. Ditches, canals and dikes could be constructed in wetlands to have beneficial effects. For example, a ditch could be built to increase the hydroperiod of a wetland and result in a benefit. A dike could enhance a mitigation area, which would also result in environmental benefits. Thus, the repeal of this prohibition could benefit wetlands. The 1984 data and analysis contained in the EAR recommended that the prohibition be deleted and instead suggested the use of performance standards for the construction of ditches, canals, dikes, or other drainage features in wetlands. The EAR-based amendments to the Lee Plan do not include performance standards for the construction of ditches, canals, dikes, or other drainage features in wetlands. Instead, the County has modified Policy 84.1.1 (renumbered 84.1.2) in part by deleting the following language: Wetland regulations shall be designed to protect, conserve, restore, or preserve water resource systems and attendant biological functions, including: Preventing degradation of water quality and biological productivity. Preventing degradation of freshwater storage capabilities. Preventing damage to property and loss of life due to flooding. Preventing degradation of the viability and diversity of native plants and animals and their habitats. Assuring the conservation of irretrievable or irreversible resources. In place of those performance standards, the EAR-based Policy 84.1.2 provides: The county's wetlands protection regulations will be amended by 1995 to be consistent with the following: In accordance with F.S. 163.3184(6)(c), the county will not undertake an independent review of the impacts to wetlands resulting from development in wetlands that is specifically authorized by a DEP or SWFWMD dredge and fill permit or exemption. No development in wetlands regulated by the State of Florida will be permitted by Lee County without the appropriate state agency permit or authorization. Lee County shall incorporate the terms and conditions of state permits into county permits and shall prosecute violations of state regulations and permit conditions through its code enforcement procedures. Every reasonable effort shall be required to avoid or minimize adverse impacts on wet- lands through the clustering of development and other site planning techniques. On- or off-site mitigation shall only be permitted in accordance with applicable state standards. Mitigation banks and the issuance and use of mitigation bank credits shall be permitted to the extent authorized by applicable state agencies. As a part of the EAR-based amendments, the County also modified Policy 84.1.4 by deleting language that addressed permitted uses in wetlands and their densities, but that issue is now covered under renumbered Policy 84.1.1. The amendments added to Policy 84.1.4 the following provision: Land uses in uplands will be regulated through the implementation of the Land Development Code to avoid degrading the values and functions of adjoining and nearby wetlands. New Policies 84.1.2 and 84.1.4 in effect defer performance standards covering development in wetlands to the state and water management district permitting processes. The Lee amendments in part are an attempt to avoid duplicating what state agencies accomplish through their permitting programs. The evidence is that the state and water management district permitting processes include newly adopted Environmental Resource Permit (ERP) rules. These rules consider the type, value, function, size, condition and location of wetlands in determining how to protect them. The ERP rules also require proposed development to avoid or eliminate wetland impacts or, if not possible, to minimize and mitigate for them. The ERP rules also require consideration of the cumulative and long-term adverse impacts of development on wetlands in a comprehensive manner within the same water basin. The DEP and the Southwest Florida Water Management District also have adopted supplemental ERP rules covering only the jurisdiction of that water management district, which includes Lee County. By including a requirement that every state environmental permit shall be incorporated into county permits and that violations of a state permit also are violations of the county permit, the Lee Plan commits the County to assist the State in enforcing environmental permits in Lee County. Through this new emphasis on compliance and enforcement, Lee County will be providing valuable assistance to state environmental protection. Lee County's efforts will assist those agencies by devoting staff to compliance and enforcement efforts. Prior to the EAR-based amendments, the County had two wetland land use categories under the Lee Plan. These were described as the Resource Protection Areas (RPA) and Transition Zones (TZ). Guidelines and standards for permitted uses and development in the RPA and TZ were found in the policies under Objective 84.1 and 84.2, respectively. As a part of the EAR-based amendments, the County replaced the RPA and TZ categories with a single Wetlands category. This new Wetlands category includes all lands that are identified as wetlands under the statewide definition using the state delineation methodology. The County's definition of "wetlands" in the plan amendments covers more area than the areas previously known as "resource protection" and "transition zones." To that extent, the present amendments to the Lee Plan give greater protection to wetlands than the previous version of the Lee Plan. The Lee Plan, as amended, also contains other GOP's. Taken together, the GOP's ensure the protection of wetlands and their natural functions. Reservation of Future Road Right-of-Way. As a part of the EAR-based amendments, the County has deleted or amended certain policies in the Traffic Circulation Element of the Lee Plan regarding the acquisition and preservation of rights-of-way. Deleted Policy 25.1.3 provided that the County would attempt to reserve adequate rights-of-way for state and county roads consistent with state and county plans. The County also deleted Policy 21.1.7, which addressed the possibility of acquiring future rights-of-way through required dedications of land. Policy 21.1.7 provided: The previous policy encouraging the voluntary dedication of land for future right of way needs shall not be construed so as to prohibit the adoption of regulations requiring such dedication. However, any such regulations must provide for a rational nexus between the amount of land for which dedication is required and the impact of the development in question, and must also provide that such dedication, when combined with other means which may be used to offset the impact of development (such as, for example, the imposition of impact fees), does not exceed the total impact of the develop- ment in question upon the county's transportation network. The "previous policy encouraging the voluntary dedication of land for future right of way needs," referenced in Policy 21.1.7, above, was Policy 21.1.6, which has been renumbered 21.1.5. As modified, that policy provides: In order to acquire rights-of-way and complete the construction of all roads designated on the Traffic Circulation Plan Map, voluntary dedications of land and construction of road segments and inter- sections by developers shall be encouraged through relevant provisions in the development regulations and other ordinances as described below: Voluntary dedication of rights-of-way necessary for improvements shown on the Traffic Circulation Plan Map shall be encouraged at the time local development orders are granted. In cases where there are missing segments in the traffic circulation system, developers shall be encouraged to also construct that portion of the thoroughfare that lies within or abuts the development, with appropriate credits granted towards impact fees for roads. However, site-related improvements (see glossary) are not eligible for credits towards impact fees. Policy 21.1.7 provided policy guidance for LDRs in establishing required dedication of future rights-of-way as a means of acquisition, if the County chose to use that measure. Policy 21.1.6 (renumbered 21.1.5) provides policy guidance for LDRs in establishing voluntary dedication of future rights- of-way as another means of acquisition. By deleting Policy 21.1.7, the Lee Plan, as amended, is left with a policy that establishes only the voluntary dedication measure as a means towards acquiring future rights-of-way to facilitate the construction of roads designated on the Traffic Circulation Plan Map of the Lee Plan. The County has made these changes because legally it appears that reservation of future right-of-way may no longer be a viable option after the decision in Joint Ventures, Inc., v. Dept. of Transportation, 563 So. 2d 622 (Fla. 1990). The County's plan does more than just encourage voluntary dedication of rights-of-way. There are numerous policies in the Lee Plan that, taken together, adequately address the acquisition and preservation of rights-of-way. The following policies relate and achieve right-of-way protection: Policy 1.3, 1.6, 4.1.1, 4.1.2, 6.1.5, 16.3.5, 21.1.5, Objective 21.2, Policies 21.2.1, 21.2.3, 21.2.5, 21.2.6, 21.2.7, Policy 23.1.2, 23.1.4, 23.2.3, Policy 25.1.1, and 25.1.3. Under these policies, all new projects receive a review for voluntary dedication as against the Lee County official trafficways map and the facility need identified for the planning horizon of the future traffic circulation element and map. In addition, all new developments are required to mitigate off-site impacts through a payment of impact fees. They are also required to address and mitigate site-related impacts through the provision of site-related improvements at the developer's expense. Payment of impact fees and additional revenues generated through mitigation of site-related impacts, both generate revenues for the capital improvements programming process for purchase of rights-of-way. Accomplishing necessary site-related improvements pursuant to the Lee County program also frequently results in County acquisition of rights-of-way at the developer's expense. Mitigation of site-related impacts, as well as payment of proportional share and impact fees, are generally accomplished through Policy 1.8.3, Subsection 1, Policy 2.3.2, Objective 3.1, Policy 3.1.3, Policy 7.1.2, Policy 14.3.2, Objective 22.1, 23.1, and the policies thereunder, Policy 23.1.1, 23.1.3-.7, 23.2.6, Objective 24.2, Policy 25.1.2, Objective 28.2, and Policy 70.1.1, Subsection A-7. The County's primary method of acquisition of rights-of-way is through the Capital Improvements Element. The Capital Improvements Element does include projected costs to purchase needed rights-of-way. The Lee County Capital Improvements Program is accomplished through Goal 70 of the Lee Plan, which expressly includes acquisition of rights-of-way. Objective 77.3 - Wildlife. Before the EAR-based changes, Objective 77.3 of the Lee Plan was to: "Maintain and enhance the current complement of fish and wildlife diversity and distribution within Lee County for the benefit of a balanced ecological system . . .." In pertinent part, the EAR-based amendment deleted the phrase "current complement of." The change does not alter the meaning of the objective. The concept of a baseline expressed by the deleted phrase also is inherent in the words "[m]aintain and enhance" and remains in the amended objective. Policy 77.11.5 - Endangered and Threatened Species. The EAR-based amendments deleted Policy 77.11.5, which stated: Important black bear and Florida panther use areas shall be identified. Corridors for public acquisition purposes shall be identified within these use areas. The corridor boundaries shall include wetlands, upland buffers, and nearby vegetative communities which are particularly beneficial to the Florida panther and black bear (such as high palmetto and oak hammocks). Data and analysis supports the deletion of the first two sentences. The use areas and public acquisition corridors have been identified. To reflect the new data and analysis, Policies 77.11.1 and 77.11.2 also were amended to provide for updating of data on sitings and habitat for these species and to encourage state land acquisition programs. The last sentence of former Policy 77.11.5 has been transferred and added verbatim to Policy 77.11.2. Related Policy 77.11.4 was also amended to reflect new data and analysis and to provide that, instead of just encouraging the acquisition of the Flint Pen Strand, the County shall continue an acquisition that is in progress. The Adoption Ordinance. As mentioned in connection with the Zemel amendment, Section 10 of the Lee County Ordinance 94-30, which adopted the plan amendments in issue in this case, purported to defer, until after the conclusion of these proceedings, the decision as to which adopted plan amendments would become effective. All of the parties now agree that the attempted deferral of this decision was "ultra vires." All of the parties except for the Zemels agree that, under Section 8 of the ordinance, the "ultra vires" part of the adopting ordinance is severable from the rest of the ordinance, which remains valid. The Zemels take the positions (1) that the state circuit courts have exclusive jurisdiction to determine whether the remainder of the ordinance is valid and (2) that the remainder of the ordinance is invalid. Section 8 of Ordinance 94-30 provided: [I]t is the intention of the Board of County Commissioners . . . to confer the whole or any part of the powers herein provided. If any of the provisions of this ordinance shall be held unconstitutional by any court of competent jurisdiction, the decision of such court shall not affect or impair any remaining provision of this ordinance. It is hereby declared to be the legislative intent of the Board of County Commissioners that this ordinance would have been adopted had such unconstitutional provisions not been included therein. The evidence was that, notwithstanding Section 8 of Ordinance 94-30, one purpose of Section 10 of the ordinance was to insure that intended packages of amendments would remain together and either become effective together or not at all. As discussed in connection with the Zemel amendment, the evidence was that one such package consisted of the amendments to the FLUM and to FLUE Policy 1.4.4, changing the land use designation of certain property to "Open Lands," and the amendments which delete the FLUM 2010 Overlay. There also was some less compelling evidence that amendments creating the Commercial Site Location Standards Map, FLUM 16, were intended to remain together with the amendments which delete the FLUM 2010 Overlay. No other examples of similar "packages" of plan amendments was shown by the evidence or argued by any party. RGMC's Standing. The Responsible Growth Management Coalition, Inc. (RGMC), was formed in 1988 to insure compliance with Chapter 163, Florida Statutes, and F.A.C. Rule Chapter 9J-5 and to conserve resources. RGMC has offices in Lee County and conducts educational programs in Lee. In addition, at the time of the hearing, RGMC had 157 members residing throughout Lee County, most or all of whom own property in Lee County. RGMC participated in the process leading to the adoption of the Lee plan amendments in issue in this case and submitted oral or written comments, recommendations or suggestions between the transmittal hearing and adoption of the plan amendments.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Administration Commission enter a final order finding that the Lee Plan amendments are not in compliance and requiring as remedial action: That the FLUE's mixed land use categories be amended to include percentage distribution or other objective measurements of the distribution among allowed uses, whether by use of an appropriate 2020 Overlay or by other appropriate means. That a sector plan be adopted for Lehigh Acres, including appropriate plans for provision of infrastructure, to create more balanced development in Lehigh and, to the extent possible, to direct future population growth to Lehigh and away from CHHA, DRGR and other environmentally sensitive areas, and Open Lands and Rural land (especially rural lands not situated so as to be potential future urban infill or expansion), including important wildlife habitat. Such a sector plan could include minimum densities and target densities to support mass transit along transit corridors in Lehigh. That consideration be given to increasing densities in central urban areas and along transit corridors while at the same time reducing densities or adopting other plan provisions, such as the prohibition of certain kinds of development, to afford more protection to CHHA, DRGR and other environmentally sensitive areas, and Open Lands and Rural land (especially rural lands not situated so as to be potential future urban infill or expansion), including important wildlife habitat. One example would be the prohibition, or staging, of non-farm development in some or all rural areas. That, in accordance with Policy 75.1.4, undeveloped areas within CHHA be considered for reduced density categories (or assignment of minimum allowable densities where density ranges are permitted) in order to limit the future population exposed to coastal flooding. That the data and analysis supporting the remedial amendments account for units approved but not built and include both a population accommodation analysis based on maximum densities and an explanation of how the GOP's in the remedial amendments justify the resulting allocation ratio. That the remedial amendments include data and analysis of the impact of the resulting plan, as amended, on hurricane evacuation and clearance times and shelter planning, especially if, as part of remedial amendments, the 2010 Overlay is removed (or replaced). That the remedial amendments be based on data and analysis as to the need for commercial and industrial land, including the Alico amendment property. That the data and analysis extrapolate solid waste projections to 2020. That the sub-elements of the Community Facilities and Services Element (and other parts of the plan, as appropriate) be consistent with and based on data and analysis of future population predictions in light of any remedial amendments to the FLUE and FLUM. RECOMMENDED this 31st day of January, 1996, in Tallahassee, Florida. J. LAWRENCE JOHNSTON, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of January, 1996. APPENDIX TO RECOMMENDED ORDER, CASE NO. 95-0098GM To comply with the requirements of Section 120.59(2), Fla. Stat. (1995), as construed by the decision in Harbor Island Beach Club, Ltd., v. Dept. of Natural Resources, 476 So. 2d 1350 (Fla. 1st DCA 1985), the following rulings are made on the parties' proposed findings of fact: DCA's Proposed Findings of Fact. 1-17. Accepted. 18. There is a legal issue whether Ordinance 94-30 was adopted validly; otherwise, accepted. 19.-28. Accepted. Conclusion of law. Rejected in part: plan includes "guides" (but no "objective measurements"); and Commercial Site Location Standards Map 16 implies that other uses are required elsewhere in the districts where these sites are located. Otherwise, accepted. Last sentence, rejected. (Assumptions are in part "based on" the GOP's, but they also assume less development than permitted by the GOP's.) Otherwise, accepted. Accepted. Characterization "conservative" rejected as argument; otherwise, accepted. 34.-35. Accepted. 36. Accepted as being theoretically possible, but not likely to happen. 37.-38. Accepted. 39. Accepted as approximation of maximum theoretical residential capacity. 40.-46. Accepted. (However, as to 45 and 46, these numbers do not take into account industrial land needed to serve municipal populations that probably cannot or will not be supplied within the cities themselves.) First sentence, conclusion of law. Second sentence, rejected as not proven by a preponderance of the evidence. (The plan is "based on" the population projections, but allocates more land than needed to accommodate the population.) First sentence, conclusion of law; second sentence, accepted. 49.-50. Conclusions of law. 51.-52. First sentence, conclusion of law; rest, accepted. 53. First sentence, conclusion of law; second and third sentences, rejected as not proven by a preponderance of the evidence; last sentence, accepted. 54.-55. First sentence, conclusion of law; rest, rejected as not proven by a preponderance of the evidence. 56. First sentence, conclusion of law; rest, accepted. 57.-58. First sentence, conclusion of law; rest, rejected as not proven by a preponderance of the evidence. First sentence, conclusion of law; second, accepted; third, rejected as not proven by a preponderance of the evidence. First sentence, conclusion of law; rest, rejected as not proven by a preponderance of the evidence. First sentence, conclusion of law; second, rejected as not proven by a preponderance of the evidence; third, accepted (but does not prove non- compliance with the state plan.) First sentence, conclusion of law; rest, rejected as not proven by a preponderance of the evidence. 63.-64. Accepted. As to b.1. not timely raised; accepted as to b.2. (but easily extrapolated five more years to 2020); otherwise, rejected as not proven beyond fair debate. First two sentences of a. and b., accepted; otherwise, rejected as not proven beyond fair debate. (As to b., the discrepancies are not significant enough to create "internal inconsistency.") First sentence, rejected as not proven beyond fair debate; rest, accepted. Rejected as not proven by a preponderance of the evidence that deletion of the Overlay "accelerated development." (Rather, it allows--and, under certain conditions, would result it--development of more acreage sooner.) First sentence, accepted; rest, conclusion of law. First sentence, accepted; second, rejected as not proven beyond fair debate. First and third sentences, accepted; rest, rejected as not proven by a preponderance of evidence. (The population projections are easonably accurate and certainly more realistic than the "maximum theoretical" populations used in the DCA's residential allocation analysis.) Last sentence, rejected as not proven by a preponderance of evidence. (The RWSMP population projections are reasonably close to the Figure 14 projections. See also 66., above.) First sentence, accepted; rest, rejected as not proven by a preponderance of evidence. See also 71., above. 74.-77. Accepted. 78. 2850 rejected as somewhat high (does not take into account some acreage removed from AC); otherwise, accepted. 79.-81. Accepted. 82.-83. Accepted. However, last sentences assume: (1) accurate inventory of developed acres in Orlando comparable to the land uses in AC under the Lee Plan; (2) 2850 acres of AC; and (3) developability of all AC acreage--including wetlands--for AC use. Those assumptions are not, or may not be, reasonable. 84. Rejected as not proven by a preponderance of evidence. See 82.-83. 85.-87. Accepted. However, as to 87., it is noted that the words "area," "surrounded by," and "nearby" are imprecise. Accepted; however, the degree of the sandstone aquifer's "susceptibility" to impacts depends on many factors. Last sentence, rejected as not proven by a preponderance of evidence that existing sources cannot produce any more; however, proven that new sources will be required, and otherwise accepted. Accepted. Last sentence, rejected as not proven by a preponderance of evidence that groundwater moves "to" the existing and planned wellfields. Otherwise, accepted. First sentence, rejected as not proven by a preponderance of evidence; rest, accepted. Fourth sentence, rejected as not proven by a preponderance of evidence; rest, accepted. First sentence, accepted; second, rejected as not proven by a preponderance of evidence. Accepted. Rejected as not proven by a preponderance of evidence that the circuit court judgment was based entirely on new data and analysis; otherwise, accepted. 97.-98. Accepted. Characterization of methodology as "flawed" rejected as not proven by a preponderance of evidence. (It depends on the use being made of the results of the methodology.) Otherwise, accepted. Accepted. Last sentence, legal conclusion. (Legally, it appears that reservation of future right-of-way may no longer be a viable option, and the County's amendments presume that it is not.) Rest, accepted. 102.-105. Accepted. 106. Rejected as not proven by a preponderance of evidence that voluntary dedication is not "effective" as one of several policies. Otherwise, accepted. 107.-108. Accepted. First sentence, accepted; rest, rejected as not proven by a preponderance of evidence. Accepted. First sentence, accepted; rest, rejected as not proven by a preponderance of evidence. Accepted. Second and third sentences, rejected as not proven by a preponderance of evidence that the state regulations are supposed to serve as "guidelines" or "guidance" for LDR's; rather, they are to serve in the place of duplicative County LDR's on the subject. Otherwise, accepted. Accepted. (However, appropriate comprehensive planning for wetlands occurs in other parts of the plan; the state regulations take the place of performance standards that would be duplicated in plan provisions and LDR's.) Last sentence, rejected as not proven by a preponderance of evidence and as conclusion of law. Rest, accepted. (However, state regulations apply to some uplands that adjoin or are near to wetlands.) First sentence, accepted. (They don't guide the establishment of design and performance standard kinds of LDR's for any development in any wetlands; the state regulations take the place of design and performance standards that would be duplicated in plan provisions and LDR's.) Second sentence, rejected as not proven by a preponderance of evidence (that they are the "core wetland policies in the plan.") Third sentence, rejected as not proven by a preponderance of evidence and as conclusion of law. RGMC's Proposed Findings of Fact. 1.-8. Accepted. 9. Conclusion of law. 10.-15. Subordinate; conclusion of law; argument. 16. Accepted but subordinate. 17.-18. Rejected as not supported by record evidence. 19.-35. Accepted. 35(a). Conclusion of law. 36.-40. Accepted. 40(a). Conclusion of law. 41. Accepted. 41(a). Conclusion of law. 42.-44. Accepted. Accepted; however, the option to consider assignment of the minimum of a range of densities is in parentheses after the primary option to consider reducing densities. Largely argument. The objective and policy is "triggered" by any plan amendment, before and after the change from "A Zone" to "CHHA." See 47. Accepted. 47(a). Rejected as not proven beyond fair debate. (It is a question of internal consistency.) Accepted. 48(a). Argument and recommended remediation. Accepted. 50.-59. County motion to strike granted. (Issue not raised timely.) 60.-62. Accepted. See rulings on DCA proposed findings. County motion to strike granted. (Issue not raised timely.) 65.-66. Rejected as not proven by a preponderance of evidence. (The population projections are reasonably accurate and certainly more realistic than the "maximum theoretical" populations used in the DCA's residential allocation analysis.) 67.-73(a) County motion to strike granted. (Issue not raised timely.) See rulings on DCA proposed findings. Accepted. Rejected as not proven by a preponderance of evidence. 77.-78. 2800 rejected as somewhat high (does not take into account some acreage removed from AC); 1000 rejected as 400 low; otherwise, accepted. 79.-81(a). Accepted. Rejected as not proven by a preponderance of evidence. 82(a). Accepted. Conclusion of law. Rejected as not proven by a preponderance of evidence. Accepted. Accepted but "between" is imprecise. Accepted, but not likely. Accepted that two are mutually exclusive; otherwise, rejected as not proven by a preponderance of evidence. Rejected as not proven by a preponderance of evidence. Rejected as not proven beyond fair debate. Accepted. Rejected as not proven by a preponderance of evidence that the lands are "adjacent"; otherwise, accepted. 93.-94. Accepted. Rejected as not proven beyond fair debate. Rejected as not proven by a preponderance of evidence. Accepted. Rejected as not proven by a preponderance of evidence. See rulings on DCA proposed findings. Rejected as not proven by a preponderance of evidence that it is "the reasonable professionally acceptable methodology." Rejected as unclear and as not proven by a preponderance of evidence. (Whether it is appropriate to apply a safety margin factor just to projected new growth can depend on the safety margin factor used and how far out the projection.) Rejected as unclear and as not proven by a preponderance of evidence. Rejected as being hypothetical argument. (Also, the ratios do not convert to percentages, i.e., 25:1 does not convert to a safety margin factor of 25 percent.) 104.-111(a). Rejected as not proven by a preponderance of evidence that "overallocations" occur in the earlier years of the planning timeframe; the relevant inquiry relates to the planning horizon. Also, as to 111., the reference should be to the year 2020. (Also, again the ratios do not convert to percentages.) Otherwise, accepted. 112.-118. Accepted as being paraphrased from part of the Sheridan Final Order. 119.-128. Accepted as being the adjustments to Figure 14B to yield unrealistic "maximum theoretical" capacity. 129.-130. Conclusions of law. 131. Accepted. 132.-133. Rejected as not proven by a preponderance of evidence. (The plan does not "propose development"; its projections on which the County bases its facilities and services are more realistic that the "maximum theoretical" capacity projections.) Also, these specific issues were not timely raised, and County motion to strike granted. 134. Accepted. 135.-140. Descriptions of what the various FLUM's show and what development has occurred over the years, accepted as reasonably accurate. Rejected as not proven by a preponderance of evidence that there were either official or unofficial "urban expansion lines." (It was not clear from the evidence whether the so-called "Proposed EAR Urban Boundary" shown on Lee Exhibit 53 was either an official or an unofficial "urban expansion line," and there was no other evidence of any "urban expansion lines.") Also, rejected as not proven by a preponderance of evidence that there was a "failure to maintain" them, or that the Southwest International Airport or the Westinghouse Gateway DRI "breached" the alleged "1988 urban expansion line." (The Westinghouse Gateway DRI was vested prior to 1984, and the regional airport development appears on FLUM's prior to 1988.) Also, development that occurred in earlier years is not particularly probative on the issues in this case (in particular, the amendment eliminating the Overlay). 141.-142. Accepted. 142(a). Rejected as not proven by a preponderance of evidence. Also, the specific issue of failure to establish an "urban expansion line" is not raised by amendments at issue in this case (in particular, the elimination of the Overlay), and was not timely raised by any party. 143.-146. Densities in land use categories, accepted as reasonably accurate. The rest is rejected as not proven by a preponderance of evidence. The plan provisions (or lack of them) in question have been determined to be in compliance. Primarily, with deletion of the Overlay, the amendments at issue open up for development in accordance with these plan provisions more acreage of non-urban land uses prior to 2010. They also do not extend the Overlay to 2020. 147.-150. Accepted. For the most part, the plan provisions (or lack of them) in question have been determined to be in compliance; however, failure of the plan to include objective measures for distribution of uses in mixed land use districts contributes to the overallocation without the Overlay. 150(a). Rejected as not proven by a preponderance of evidence; also, conclusion of law. Conclusion of law. In part, accepted; in part conclusion of law. For the most part, the plan provisions (or lack of them) in question have been determined to be in compliance; however, failure of the plan to include objective measures for distribution of uses in mixed land use districts contributes to the overallocation without the Overlay. Rejected as not proven by a preponderance of evidence; also, conclusion of law. 154.-160. Accepted. Rejected as not proven by a preponderance of evidence. (It remains to be seen how effective they will be in the long term.) Accepted. For the most part, the plan provisions (or lack of them) in question have been determined to be in compliance; however, with deletion of the Overlay, the amendments at issue open up for development in accordance with these plan provisions more acreage in potential wildlife habitat and corridor areas prior to 2010. (They also do not extend the Overlay to 2020.) See rulings on DCA proposed findings. 164.-168. Rejected because issues not raised timely. 169. Rejected as not proven by a preponderance of evidence and as conclusion of law. 170.-174. County motion to strike granted. 175.-179. Accepted. 180.-182. Conclusions of law. 183.-184. Rejected as not proven beyond fair debate. 185. Accepted. 186.-188. Rejected as not proven by a preponderance of evidence. 189. First clause, rejected (see 186.-188.); second clause, accepted. 190.-191. Rejected as not proven by a preponderance of evidence. 192.-193. Rejected as not proven beyond fair debate. 194. Conclusion of law. 195.-196. Rejected as not proven by a preponderance of evidence. 197.-198. Except for typographical errors, accepted. (However, the last sentence of former Policy 77.11.5 was transferred verbatim to amended Policy 77.11.2.) Rejected as not proven by a preponderance of evidence to be the entire justification. (Also justified by updated data and analysis--namely, that the habitats have been identified and mapped--and by amended Policies 77.11.1 and 77.11.2, which respond to the new data and analysis.) Argument. 201.-204. Cumulative. (See 154.-157.) 205.-206. Rejected as not proven by a preponderance of evidence. 207.-208. Accepted. Accepted (although not demonstrated by Lee Exhibit 49). Rejected as contrary to the greater weight of the evidence. Accepted. Rejected as not clear from the evidence that the Zemel property is connected to and part of the Cecil Webb Wildlife Management Area. Otherwise, accepted. 213.-216. Accepted. 217.-218. Not an issue; but, if an issue, rejected as not proven by a preponderance of evidence (which is not to say that it was proven that the land should be designated for higher densities, or that 1 unit per 5 acres or lower densities are not suitable.) 219.-222. Not an issue; but, if an issue, rejected as not proven beyond fair debate (which, again, is not to say that it was proven that the land should be designated for higher densities, or that 1 unit per 5 acres or lower densities are not suitable.) 223. Not an issue; but, if an issue, rejected. See 217.-222. Zemels' Proposed Findings of Fact. 1. Accepted; however, relatively little of the Zemel property abuts either U.S. 41 or Burnt Store Road. 2-10. Accepted. Last clause rejected as not proven beyond fair debate; another option would be to amend the definition. Otherwise, accepted. Last clause, rejected as not proven by a preponderance of evidence that they are not "sparsely developed." Otherwise, accepted. 13.-15. Accepted. First sentence, rejected as not proven by a preponderance of evidence; otherwise, accepted. First sentence, rejected as not proven by a preponderance of evidence as to the south; otherwise, accepted but irrelevant to the application of the definition. Accepted; however, not proven by a preponderance of evidence that the Zemel property is not north of "sparsely developed areas." (Emphasis added.) Rejected as not proven by a preponderance of evidence. Accepted. First sentence, rejected as not proven by a preponderance of evidence. Rest, accepted in large part and rejected in part as not proven by a preponderance of evidence. Clearly, at least a good portion of the Zemel property is "extremely remote" from all existing public services. Some portions of the Zemel property are not "extremely remote" from some public services, but not proven by a preponderance of evidence that at least some public services are not "extremely remote" from all portions of the Zemel property. Also, in addition to existing public services, c) and e) also refer to future public services. Rejected as not proven by a preponderance of evidence that no agricultural activities have been profitable (only that row crop farming has not); otherwise, accepted. Last sentence, not proven by a preponderance of evidence; otherwise, accepted. Rejected as not proven by a preponderance of evidence. Rejected as not proven by a preponderance of evidence (as to second and third sentences, because of the existence of the Open Lands category.) Accepted (although there also are other data and analysis in the record). First sentence, rejected as not proven by a preponderance of evidence. (Not all of the statements are "conclusory".) Second, accepted. Third, rejected; see 21., above. 28.-29. Accepted. (However, as to 29., it refers to existing access.) First sentence, accepted. A. - rejected as not proven by a preponderance of evidence that the analysis "fails to recognize" the roads in northern Cape Coral (although it clearly does not mention them); otherwise, accepted. B. - rejected as not proven by a preponderance of evidence that the analysis "appears to ignore" the water line along U.S. 41 (although it clearly does not mention it); otherwise, accepted. C. - accepted; however, the "proximity" is to a point on the periphery of the property. Last sentence, rejected as not proven by a preponderance of evidence. Accepted. Second sentence, rejected as not proven by a preponderance of evidence except using the County's methodology. Otherwise, accepted. 33.-34. Accepted. Second sentence, rejected as not proven by a preponderance of evidence. (The County in effect "borrowed" the DCA's data and analysis.) Rest, accepted. Accepted, assuming the County's methodology; however, there also are other concerns. Accepted. First sentence, accepted; rest, rejected as not proven by a preponderance of evidence. As to the second, there is rural land to the northwest; as to the third, there also is resource protection land in Charlotte County to the north, and the "enclave" is large; as to the fourth, no I-75 boundary would appear to apply to Township 43 even if it might appear to apply to the south. Rejected as not proven by a preponderance of evidence. (The analysis compares the costs and difficulty in Yucca Pen to Lehigh and Cape Coral; in terms of such a comparison, the differences are significant.) 40.-45. Accepted. County's Proposed Findings of Fact. 1.-2. Accepted. First sentence, accepted; second, rejected as contrary to the greater weight of the evidence; third, accepted (assuming "actual bona fide business" means a for-profit commercial enterprise.) Accepted. Rejected as contrary to the greater weight of the evidence that the DCA "agreed with and relied on" the County's analysis. (The DCA utilized the analysis for purposes of its objection.) Otherwise, accepted. Accepted. First sentence, accepted. Second, rejected as contrary to the greater weight of the evidence that the determination was "on a largely subjective basis" (although some determinations necessarily were at least partly subjective); otherwise, accepted. Accepted. Rejected as contrary to the greater weight of the evidence that the Overlay was designed "without policy considerations" or that historic growth trends were "simply extrapolated." (The policy considerations already in the plan were utilized, and an effort was made to predict growth in light of those policy considerations. It is true, however, that the Overlay was not designed to further direct growth patterns within the planning districts and subdistricts.) Accepted (but not particularly probative). 11.-14. Accepted. Rejected in part as contrary to the greater weight of the evidence to the extent that it implies that the impact of the plan was not taken into consideration in predicting future population. See 9., above. Otherwise, accepted. Firsts sentence, accepted. As to second and third, not clear from the evidence what if anything was submitted in the way of data and analysis for the remedial amendments. They were not introduced in evidence or referred to by any party. As to the last sentence, it is not clear from the evidence exactly how the 2.11 factor was derived or whether it took into account the 2010 population accommodation for Lehigh (282,000 people in this analysis). (T. 1267-1269.) If the 507,000 units of accommodation did not include Lehigh, the total accommodation of 1.06 million also could not have included Lehigh. Accepted. First three sentences, argument. Rest, accepted. 19.-20. Accepted. 21. Rejected as unclear what "that allocation" refers to. (Accepted if it means "up to 125 percent"; rejected as contrary to the greater weight of the evidence if it means "200 percent.") 22.-23. Accepted. First sentence, accepted; second, conclusion of law. First sentence, rejected as contrary to the greater weight of the evidence; second, accepted. Rejected as contrary to the greater weight of the evidence. Subordinate. Rejected as contrary to the greater weight of the evidence. (In addition, a more meaningful comparison would be between the adopted EAR 2020 plan without a 2010 Overlay and a 2020 plan with an overlay extending the 2010 Overlay out another ten years.) Last sentence, rejected as contrary to the greater weight of the evidence. Rest, accepted (as accurate recitation of testimony) but subordinate to facts contrary to those found. 30.-32. Accepted. Conclusion of law. Rejected as contrary to the greater weight of the evidence. Rejected as contrary to the greater weight of the evidence. (As to first sentence, see Sheridan Final Order.) Accepted. First and last sentences, accepted. Rest, rejected as contrary to the greater weight of the evidence. Such an approach would direct population to Lehigh, which might be the best thing to do. (At this point in time, development of Lehigh under a good Sector Plan might be able to change what was classic urban sprawl under past conditions into well-planned growth under present and future conditions.) It might also direct population to other, non- urban areas if densities were not low enough in them. Finally, Nelson suggested other ways of bring the plan into compliance without the Overlay. 38.-42. Accepted. First sentence, accepted; second, rejected as contrary to the greater weight of the evidence. The County did not seek to "match the available land to meet that growth"; rather, it checked to see if what was on the FLUM would "accommodate" (i.e., hold) the population projected for 2020. Last sentence, rejected in that RGMC challenged the opinion in its response to this proposed finding; otherwise, accepted. Rejected that the County "cannot alter the future development" of Lehigh or that Lehigh is "beyond the reach of" the comprehensive plan; otherwise, accepted. The 199 acres is part of the 685 acre total. Otherwise, generally accepted. However, significant additional growth can be expected in coastal areas, and there is rural land both within and outside the so-called "I-75, U.S. 41 corridor"; presumably, the existence of this land is the reason the finding is couched in the terms: "the remaining area . . . is largely . . . along the I-75, U.S. 41 corridor"; and "all future growth . . . will predominantly occur." First and third sentences, conclusion of law; second, accepted. Conclusion of law. First sentence, accepted but subordinate; also, the rule citation is incorrect; in addition, they testified to the effect of removing the Overlay. Second sentence, conclusion of law. Accepted. (The effect of the Overlay is in the extent of the indicators that exist.) Accepted. First sentence, rejected as contrary to the greater weight of the evidence; second, accepted; third, conclusion of law; fourth, accepted. First sentence, rejected as contrary to the greater weight of the evidence; second, accepted. First sentence, accepted; second, conclusion of law. First sentence, accepted. Second, rejected as contrary to the greater weight of the evidence. Rejected as contrary to the greater weight of the evidence. Rejected as contrary to the greater weight of the evidence that it is "clear"; also, conclusion of law. 58.-60. Accepted. Rejected as contrary to the greater weight of the evidence. (The same conditions exist without the Overlay.) Accepted. Rejected as contrary to the greater weight of the evidence. Accepted. First sentence, rejected; second, accepted. Rejected as contrary to the greater weight of the evidence that the Overlay did not have any "true policy bias or consideration built into it"; otherwise, accepted. Accepted. (However, the same conditions exist without the Overlay.) 68.-71. Accepted. Rejected as contrary to the greater weight of the evidence that "removing Cape Coral . . . reduces the FLUM capacity"; rather, it represents a change in the methodology of evaluating the FLUM capacity. Otherwise, accepted. Accepted. 74.-78. Accepted. However, it appears that the County's treatment of Lehigh essentially was a device to enable it to have the projected population in the year 2020 treated as if it were the capacity of Lehigh in the year 2020. 79.-81. First sentence of 79, unclear; rest, accepted. However, only certain retail commercial are restricted to the locations on Map 16; others can go either there or elsewhere. 82.-85. Conclusion of law. First sentence, conclusion of law; rest, accepted. Accepted. Rejected as contrary to the greater weight of the evidence that the ELUM "represents the growth trends" (rather, it shows what is there now) or that, except for Lehigh, growth only "is occurring in the north/south core." Otherwise, accepted. Accepted. First and last sentences, rejected as contrary to the greater weight of the evidence. ("Barrier" is too strong; "obstacle" or "hindrance" would be accepted.) Otherwise, accepted. 91.-95. Generally, accepted. Conclusion of law. Rejected as contrary to the greater weight of the evidence and as conclusion of law that they are "objective measures" and "responsive to . . . 5(c)"; otherwise, accepted. Accepted. First sentence, accepted; second, accepted (although some higher, urban densities are in coastal areas, and there remains some rural land in the so-called "north/south core"); third, rejected as contrary to the greater weight of the evidence that a "large impact" is "clear"; fourth, rejected as contrary to the greater weight of the evidence that the "segmentation" is absolute but otherwise accepted. Except for Lehigh, generally accepted. (What is missing are "objective measures.") Generally, accepted. First sentence, conclusion of law; second, rejected as contrary to the greater weight of the evidence. Accepted. Rejected as contrary to the greater weight of the evidence that it is "nearly identical." Third sentence, rejected as contrary to the greater weight of the evidence that it necessarily is not excessive. The evidence was that it is not necessarily excessive, but it could be depending on many factors, including whether it was calculated based on total capacity on the planning horizon or incremental growth during the planning timeframe, and the length of the planning horizon. Otherwise, accepted. First two sentences, accepted; last two, rejected as contrary to the greater weight of the evidence. 107.-108. Accepted. 109. First sentence, rejected as contrary to the greater weight of the evidence; second, accepted. 110.-117. Rejected as contrary to the greater weight of the evidence. The effect of removing the Overlay is to allow more development sooner throughout the County. The effect of the increased development would depend on how it occurs. As to 116 and 117, one purpose of the Overlay was to require a mix of uses in mixed land use districts. First sentence, rejected. See 110-117, above. Rest, accepted. Cumulative. Last sentence, subordinate argument; except for apparent typographical error in third sentence, rest accepted. Last sentence, rejected as unclear from the evidence why there has been no agricultural use; otherwise, accepted. Accepted. Last sentence, rejected as contrary to the greater weight of the evidence. ("Significance" depends on other factors as well, including the amount of acreage in other mixed land use categories that allow light industrial.) Assuming that the "127 additional acres" refers to uplands, the rest is accepted. 124.-125. Rejected as contrary to the greater weight of the evidence and, in part, conclusion of law. There was no evidence of any serious risk of a taking. If these were legitimate reasons to redesignate the Alico property AC, it would be questionable if any DRGR would survive. First sentence, accepted (assuming the County's efforts are otherwise "in compliance"; second, subordinate argument; third, cumulative. Accepted. (However, the County's analysis does not include acreage in other mixed land use categories that allow light industrial.) First four sentences, accepted but irrelevant; penultimate, rejected as contrary to the greater weight of the evidence that it is "safe to assume"; last sentence, accepted. First two sentences, accepted; third, rejected as contrary to the greater weight of the evidence that mining would "permanently preempt" commercial use, but accepted that subsequent commercial use would be much less likely; fourth sentence, accepted (except for typos); last sentence, accepted. Second sentence, rejected as not clear that it "won't be available," but accepted that it may not, depending on when it is "needed." Rest, accepted. First sentence, subordinate argument; second, rejected as contrary to the greater weight of the evidence that it is "clear" but accepted that it probably "will not pose a significant threat"; third and fourth, accepted; fifth, rejected as contrary to the greater weight of the evidence that there is no recharge, but accepted that recharge is not better than average; rest, accepted. Accepted (with the understanding that the last sentence refers to surface water runoff). First sentence, accepted; second and third, rejected as contrary to the greater weight of the evidence that the Gulf Utilities-San Carlos wellfield is the only wellfield in the water table aquifer (otherwise, the third sentence is accepted). 134.-136. Accepted. Accepted. Last sentence, rejected as contrary to the greater weight of the evidence. (There also were other internal consistency issues concerning the date.) Otherwise, accepted. Rejected as contrary to the greater weight of the evidence. 140.-141. Accepted. 142. Irrelevant; issue not timely raised. 143.-144. Accepted. First sentence, accepted (in that DCA and RGMC did not prove internal inconsistency beyond fair debate); second, third and fourth sentences, accepted (but do not rule out the possibility of impacts from removal of the Overlay); rest, rejected as contrary to the greater weight of the evidence. Accepted (but do not rule out the possibility of impacts from removal of the Overlay). 147.-149. Accepted. First two sentences, argument; third, rejected as contrary to the greater weight of the evidence; last, accepted. First sentence, rejected as contrary to the greater weight of the evidence in that a reduction in densities is not necessarily positive; rest, accepted. 152.-155. Accepted. First sentence, accepted (assuming it refers to the deleted first sentence of former Policy 84.1.2, now 84.1.1); second, rejected as contrary to the greater weight of the evidence since its context requires the opposite interpretation. Accepted. First sentence, rejected as contrary to the greater weight of the evidence that the report "specifically recommends the amendment . . . in the fashion that Lee County has done." Otherwise, accepted. 159.-160. Accepted (159, based on the plan language and Joyce testimony, as well as the Deadman testimony.) First sentence, accepted; second, conclusion of law. Rejected as contrary to the greater weight of the evidence; conclusion of law; subordinate. Accepted; subordinate. Accepted. Rejected as contrary to the greater weight of the evidence that the circuit court judgment was based entirely on new data and analysis; otherwise, accepted. 166.-169. Accepted. Conclusion of law. Rejected as contrary to the greater weight of the evidence. (Use of the "allocation ratio" is being determined in this case.) Rejected as contrary to the greater weight of the evidence to the extent that the Sheridan Final Order can be said to be a DCA "publication." Otherwise, accepted. Rejected as contrary to the greater weight of the evidence in that Joint Exhibit 17 gives some indication of how to apply an "allocation ratio"; accepted that Joint Exhibit 17 does not fully explain how to apply the "allocation ratio." Accepted. Rejected as contrary to the greater weight of the evidence to the extent that the Sheridan Final Order constitutes such evidence. Accepted. Rejected as contrary to the greater weight of the evidence. Atlantic Gulf's Proposed Findings of Fact. 1.-3. Accepted. 4. Accepted (but do not rule out the possibility of impacts from removal of the Overlay). 5.-7. Accepted. 8.-10. In part conclusions of law; otherwise, accepted. (The incorporation of the DEP and SWFWMD permitting requirements only replaces former County permitting requirements; other parts of the amended plan's provisions relating to wetlands protection remain in effect.) Alico's Proposed Findings of Fact. 1.-13. Accepted. Rejected as contrary to the greater weight of the evidence in that the phrase "substantial recharge to aquifers most suitable for future wellfield development" may distinguish DRGR-suitable land from other land by the nature of the aquifer it recharges, not by the relative amounts of recharge. However, the suitability of the AC amendment property for DRGR is questionable, and redesignation to AC is not prohibited. First sentence, accepted; second, rejected as contrary to the greater weight of the evidence in that it is in the "area" of "most favorable locations for physical withdrawal of water from those aquifers." However, the suitability of the AC amendment property for DRGR is questionable, and redesignation to AC is not prohibited. 16.-19. Accepted. Accepted (assuming it refers to the DCA submitting); subordinate. Accepted. 22.-24. Subordinate argument and conclusion of law. 25.-34. Accepted. 35.-36. Accepted; subordinate. Last sentence, accepted; rest, subordinate argument and conclusion of law. Accepted (except, in s. and u., it should read "Six Mile Cypress Basin.") Rejected as contrary to the greater weight of the evidence that the list is not exhaustive ; otherwise, accepted. 40.-41. Accepted. Rejected as contrary to the greater weight of the evidence in that Policy 7.1.1 just says applications are to be "reviewed and evaluated as to" these items; it does not say that "negative impacts" must be "avoided." Rejected as contrary to the greater weight of the evidence in that Goal 12 and Standard 12.4 under it are renumbered under the current amendments as Goal 11 and Standard 11.4; otherwise, accepted. Rejected as contrary to the greater weight of the evidence in that former Standard 14.1 has been transferred to Policy 7.1.1. under the current amendments. See 40 and 42, above. Accepted. First sentence, rejected as contrary to the greater weight of the evidence that former designation as DRGR is the only reason why water quality and quantity issues arise; second, cumulative. Cumulative. First two sentences, cumulative; rest, accepted. First two sentences, accepted; rest, cumulative. First sentence, unclear which fact is "in dispute"; rest, accepted. (The AC amendment property probably would not be developed as a producing wellfield.) First sentence, accepted; second, cumulative. First two clauses of first sentence, accepted; rest, conclusion of law. First sentence, cumulative; rest, accepted. First sentence, accepted; second, conclusion of law. 55.-56. Cumulative. 57.-59. Accepted. First two sentences, accepted; rest, cumulative. Accepted. First sentence, rejected as contrary to the greater weight of the evidence; second, third and fourth sentences, accepted; rest, cumulative. First sentence, argument; rest, accepted. Accepted. 65.-66. In part, cumulative; otherwise, accepted. 67.-70. Accepted. First sentence, argument; middle sentences, accepted; penultimate sentence, rejected as contrary to the greater weight of the evidence in that he made no blanket concession, instead conditioning interception on water table levels; last sentence, accepted. First sentence, rejected as contrary to the greater weight of the evidence (that there's no "realistic way" "you" can do it); rest, accepted. 73.-74. Cumulative. Accepted. Cumulative. Accepted; subordinate and unnecessary. Cumulative. Beginning, cumulative; last sentence, subordinate argument. First sentence, accepted; second, rejected as contrary to the greater weight of the evidence in that the influence of additional pumping has not been analyzed; last, accepted. Accepted. First two sentences, conclusion of law; last, accepted. Subordinate argument. First sentence, conclusion of law; second, accepted; third, rejected as contrary to the greater weight of the evidence in that the "performance standards" say to maintain current protection and expand protection "to encompass the entire area." Accepted. (However, it is far from clear that the BMP's referred to in Policy 1.2.2 are the same ones referred to in this proposed finding.) Accepted. 87.-88. Subordinate argument. Cumulative or subordinate argument. Unclear what is meant by "several generations of numbers." Otherwise, cumulative. Cumulative. Accepted but subordinate. Accepted. (However, he also raised the question that the County's analysis did not include acreage in other mixed land use categories that allow light industrial.) 94.-95. Accepted. First sentence, subordinate argument; second, rejected as contrary to the greater weight of the evidence in that they conceded need is not based exclusively on resident and seasonal population, not that it is not based at all on it; third, accepted. First sentence, accepted; rest, subordinate argument. Accepted. Accepted. (Nor was there testimony that there is a need based on population.) Accepted. First sentence, accepted; second, conclusion of law, cumulative, and rejected as contrary to the greater weight of the evidence in that there was evidence of other motivations for providing the information as well. Accepted. (However, the analysis was limited to Orlando, and Nelson's method resulted in no need found.) Subordinate argument; cumulative. Subordinate argument. Accepted. (As to third sentence, neither did any other witness.) 106.-107. Accepted. Last sentence, subordinate argument; penultimate, rejected as contrary to the greater weight of the evidence (or, at least, unclear); rest accepted. Cumulative. 110.-113. Accepted. Cumulative. First sentence, conclusion of law; second, accepted as an excerpt from the dictionary, but argument and conclusion of law that it is the "plain meaning" of the word "need," as used in 9J-5. (Also, citation to Joint Exhibit 11, p. 9, is not understood.) Argument and cumulative. 117.-118. Accepted. 119.-120. Conclusion of law, argument and cumulative. 121. Last sentence, accepted. (It is not clear from the evidence that the designation of the property as "Panther Priority 2" on Lee Exhibit 42, introduced by RGMC, means that the County has identified it as being "in need of conservation.") Rest, conclusion of law, argument and cumulative. 122.-126. Conclusion of law and cumulative. To the extent that accepted proposed findings are not essentially incorporated into the Findings of Fact of this Recommended Order, they were considered to be either subordinate or otherwise unnecessary. COPIES FURNISHED: David Jordan, Esquire Deputy General Counsel Bridgette Ffolkes, Esquire Assistant General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Timothy Jones, Esquire Thomas L. Wright, Esquire Assistant County Attorney Post Office Box 398 Fort Myers, Florida 33902-0398 Thomas W. Reese, Esquire 2951 61st Avenue So. St. Petersburg, Florida 33712 Elizabeth C. Bowman, Esquire Connie C. Durrence, Esquire Hopping Boyd Green & Sams 123 South Calhoun Street Post Office Box 6526 Tallahassee, Florida 32314 Russell P. Schropp, Esquire Henderson, Franklin, Starnes & Holt Post Office Box 280 Fort Myers, Florida 33902 Charles J. Basinait, Esquire Henderson, Franklin, Starnes & Holt Post Office Box 280 Fort Myers, Florida 33902 Kenneth G. Oertel, Esquire Scott Shirley, Esquire Oertel, Hoffman, Fernandez & Cole, P.A. Post Office Box 6507 Tallahassee, Florida 32314-6507 Neale Montgomery, Esquire Pavese, Garner, Haverfield, Dalton, Harrison & Jensen Post Office Drawer 1507 Fort Myers, Florida 33902 Steven C. Hartsell, Esquire Pavese, Garner, Haverfield, Dalton, Harrison & Jensen Post Office Drawer 1507 Fort Myers, Florida 33902 Thomas B. Hart, Esquire Humphrey & Knott, P.A. 1625 Hendry Street, Suite 301 Post Office Box 2449 Fort Myers, Florida 33902-2449 Michael J. Ciccarone, Esquire Goldberg, Goldstein, & Buckley, P.A. Post Office Box 2366 Fort Myers, Florida 33902 Greg Smith, Esquire Governor's Legal Office The Capitol - Room 209 Tallahassee, Florida 32399-0001 Barbara Leighty, Clerk Growth Management and Strategic Planning Administration Commission The Capitol - Room 2105 Tallahassee, Florida 32399-0001

Florida Laws (9) 120.66161.091163.3167163.3177163.3184163.3191206.60218.61534.54 Florida Administrative Code (4) 9J-5.0019J-5.0059J-5.0069J-5.011
# 5
JULIE PARKER vs ST. JOHNS COUNTY, 02-002658 (2002)
Division of Administrative Hearings, Florida Filed:St. Augustine, Florida Jul. 02, 2002 Number: 02-002658 Latest Update: Feb. 28, 2003

The Issue Whether the proposed amendment to the St. Johns County 2015 Future Land Use Map (FLUM), adopted by Ordinance No. 2002-31, is "in compliance" with the relevant provisions of the Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163, Part, II, Florida Statutes. A second issue raised by St. Johns County (County) and The Estuaries Limited Liability Company (Estuaries) is whether, if the proposed amendment is not "in compliance," it is nevertheless valid and authorized pursuant to Chapter 70, Florida Statutes, the Bert J. Harris, Jr., Private Property Rights Protection Act.

Findings Of Fact The Parties Petitioner, Julie Parker, resides in St. Augustine, Florida, less than one and one-half miles from the proposed project site. Parker also owns other property in St. Johns County. Parker submitted oral comments to the County at the adoption hearing on May 28, 2002, regarding the FLUM Amendment and Ordinance No. 2002-31. The parties agreed that Parker has standing in this proceeding. The County is a political subdivision of the State of Florida. The County adopted its Comprehensive Plan in 1990. The County proceeded with the evaluation and appraisal report process in 1997 and 1998. This process ultimately resulted in the adoption of the 2015 Comprehensive Plan Amendment, Goals, Objectives, and Policies, and Adopted EAR-Based Comprehensive Plan Amendment in May 2000 (May 2000 EAR-Based Plan Amendment), which was subjected to a sufficiency review by the Department and found "in compliance." Estuaries owns the 9.99 acres (the Property) that is the subject of the FLUM Amendment. Estuaries also owns approximately 8.5 acres outside, adjacent to, and west of the Property. The 8.5 acres are subject to a Conservation Easement, which prohibits any development activity thereon. (The total contiguous land owned by Estuaries is approximately 18.5 acres.) The parties stipulated that the legal description of the Property attached to Ordinance No. 2002-31 contains less than 10 acres. Estuaries submitted comments to the County at the adoption hearing on May 28, 2002, regarding the FLUM amendment. Estuaries has standing to participate as a party in this proceeding. The Property The Property is part of a larger tract owned by Estuaries, i.e., approximately 9.9 acres out of a total tract of approximately 18.5 acres. The entire 18.5 acre tract is located on Anastasia Island, a barrier island, which extends from the St. Augustine Inlet to the Matanzas Inlet. According to the 2000 Census, there are approximately 12,000 dwelling units on Anastasia Island. This includes condominium units and single-family units. The approximately 18.5-acre site is also located in the Coastal High Hazard Area under the County May 2000 EAR-Based Plan Amendment. The Property is part of Butler Beach (bordering the Atlantic Ocean), which is an historic area because it was settled in the early 1900's by black citizens and provided them with access to the beach, which was previously unavailable. However, no historic structures or uses have occurred on the Property. The entire 18.5 acre tract is located on the south side of Riverside Boulevard. The Property is located approximately 300 feet west of Highway A1A South (A1A runs north and south). The Intracoastal Waterway and the Matanzas River are west and adjacent to the 18.5 acres. The Estuaries site is also located adjacent to the Guana Tolomato Matanzas National Estuarine Research Reserve (NERR). The Property is vacant, partially wooded, and also consists of undeveloped wetlands. Of the 9.99 acres, approximately 6.7 acres are uplands and developable, and 3.29 acres are wetlands. As noted, the remaining approximately 8.5 acres of the Estuaries' property, and to the west of the Property, is subject to a Conservation Easement in favor of the County. The properties adjacent to the Property include the following: Single-family residential units are located along and on the north side Riverside Boulevard. The existing FLUM designations for this area are Residential Coastal Density A and C, with the existing zoning of open rural (OR). (Residential Coastal Density C permits 2.0 to 4.0 units per acre.) The Intracoastal portion of Butler State Park is to the south of the Property, with a FLUM designation of parks and open space and existing zoning of OR and is not in a conservation area. To the east of the Property is a utility substation site, Butler Avenue, various commercial uses, Island House Rentals or Condominiums (three-story oceanfront condominiums), and the Mary Street Runway. There is another condominium called Creston House, directly south of the Butler Park (ocean portion) area (distinguished from the Butler State Park), consisting of three stories. (Butler Park and Creston House are located east of A1A and southeast of the Estuaries property.) The existing FLUM designations are Coastal Residential Coastal Density A and C, and have existing zoning designations of Residential General (RG)-1 and Commercial General (CG). There are no Residential Density D FLUM land use designations in the contiguous area. In short, the Property is proximate to a state park, a densely developed area comprised of small residential lots of 25 by 100 feet lots, and the two three-story condominiums, which were built prior to the adoption of the County's 1990 Comprehensive Plan. The County's Comprehensive Plan and EAR-Based Amendments On September 14, 1990, the County adopted a Comprehensive Plan-1990-2005, with amendments (the 1990 Plan). Under the 1990 Plan, the Property was assigned a Residential Coastal-A land use designation under the existing FLUM, which meant that residential development was restricted to no more than one residential unit per upland (non-wetland jurisdictional) acre. Under this designation, approximately seven units could have been built on the Property. The zoning on the Property was and is RG-1. According to the County, at least as of a June 11, 1999, letter from the County's principal planner, Timothy W. Brown, A.I.C.P., to Kevin M. Davenport, P.E., the total units which would be allowed on the Property were 116 multi-family units, derived after making a detailed density calculation based in part on using 40 percent of the wetlands used for the density calculation. In May 2000, the County adopted the EAR-Based Plan Amendment, with supporting data and analysis, which the Department of Community Affairs found to be "in compliance." As required by Chapter 163, Part II, Florida Statutes, this would have included data and analysis for the Future Land Use Element (FLUE), which was adopted as part of these plan amendments. This is part of the data and analysis which supports the FLUM Amendment at issue in this proceeding. The May 2000 EAR-Based Plan Amendment continued the Residential Coastal A land use designation of the Property, which allows 0.4 to 1.0 units per acre. (Residential Coastal B allows 2.0 units per acre; Residential Coastal C allows 2.0 to 4.0 units per acre; and Residential Coastal D allows 4.0 to 8.0 units per acre.) The Residential Coastal A designation authorizes residential and non-residential uses, such as schools, public service facilities, police, fire, and neighborhood commercial. Restaurants and banks without drive-thru facilities, gasoline pumps, and professional office buildings are examples of neighborhood commercial uses. The May 2000 EAR-Based Plan Amendment does not limit the lot size, subject to limitations on, for example, impervious surface ratios, which do not change regardless of whether the land use designation is Residential Coastal A or D. Also, any development would also have to comply with the textural provisions of the May 2000 EAR- Based Plan Amendment, including the coastal and conservation elements. The Circuit Court Litigation There are many documents in this case which pertain to the litigation between Estuaries and the County. The civil action was filed in the Circuit Court of the Seventh Judicial Circuit, in and for St. Johns County, Florida, and styled The Estuaries Limited Liability Company v. St. Johns County, Florida, Case No. CA-00271. On February 11, 2000, Estuaries filed a Complaint against the County "relating to certain representations made by the County in connection with the development of certain real property located south of St. Augustine Beach in St. Johns County, Florida." A Second Amended Complaint was filed on or about May 30, 2001. Estuaries claimed that County staff made representations to Estuaries, which resulted in Estuaries having a vested right to develop its Property up to a maximum of 116 multi-family residential units. (The County took the position that Estuaries could build no more than 25 units on the Property.) Estuaries claimed that it had vested rights based upon a claim of equitable estoppel against the County. (One of Estuaries' claims was brought pursuant to the Bert Harris, Jr., Private Property Rights Protection Act, Chapter 70, Florida Statutes.)1 After discovery and the denial of motions for summary judgment, the parties entered into a "Settlement Agreement and Complete Release" (Settlement Agreement). The "General Terms of Settlement" in the Settlement Agreement provided in part: Estuaries shall prepare and file an application to amend the future land use map of the St. Johns County Comprehensive Plan to amend the designation of only that portion of the Property such that Estuaries may build 56 multi-family residential units on the Property and such that the amendment be a "Small-scale Amendment" as defined by the Local Government Comprehensive Planning Act. Estuaries agrees on behalf of itself, its successors and assigns to build not more than 56 units on the Property. County will waive or pay the application fee and will expedite its processing. The parties will forthwith prepare and submit to the Court a joint motion for the approval of this Agreement pursuant to the Bert J. Harris, Jr., Private Property Rights Protection Act, §70.001(4)(d)2. During the review and consideration of the amendment application, the County will expeditiously process the Estuaries' revised construction plans and, in connection therewith, the construction codes in effect as of November 13, 2001 (to the extent the County may do so without violating county, state or federal law), the existing certificate of concurrency and the terms of the vesting letter as it relates to the Land Development Code, of Sonya Doerr dated September 27, 1999, shall continue to apply. In all other respects, the revised construction plans shall comply with all other Comprehensive Plan and County ordinances and regulations. On or about November 16, 2001, counsel for the parties signed a Joint Motion, requesting the circuit court to approve the Settlement Agreement pursuant to Section 70.001(4)(d)2., Florida Statutes. On November 16, 2001, Circuit Judge John Michael Traynor, entered an "Order Approving Settlement Agreement pursuant to Bert J. Harris, Jr. Private Property Rights Protection Act." Judge Traynor stated in part: The central issue in this litigation has been the number of dwelling units that would be permitted on the Property. The issues in the case are legally complex and, although the credibility of the testimony and authenticity of the exhibits expected to be introduced was not expected to be substantially in dispute or challenged, the meaning of the testimony and the meaning and inferences to be drawn from such evidence was very much in dispute. The issues included the extent of vested rights, the extent to which estoppel may be applied to the County, contractual liability, and potential liability under the Bert J. Harris, Jr. Private Property Rights Protection Act . . . and the relief requested included the request for a declaration that the Plaintiff is entitled to build up to 116 dwelling units on the Property and damages against the County. Judge Traynor also "Ordered and Adjudged," in part: Pursuant to Florida Statute § 70.001(4)(a) & (c) and applicable law, this Court finds that proper notice of a Bert Harris Act claim was timely provided to the County, and other governmental entities, and the County did make a written settlement offer to the Plaintiff, in accordance with the Bert Harris Act, that was accepted by Plaintiff. Florida Statute § 70.001(4)(c) permits, inter alia, for an adjustment of land development provisions controlling the development of a plaintiff's property; increases or modifications in the density, intensity, or use of areas of development; the transfer of development rights; conditioning the amount of development or use permitted; issuance of a development order, a variance, special exceptions, or other extraordinary relief; and such other actions specified in the statute. While the parties may dispute whether an amendment is necessary to the County's Comprehensive Plan, the parties have agreed that the Plaintiff shall submit a small-scale amendment to the County for consideration and approval pursuant to the Local Government Comprehensive Planning and Land Development Regulation Act. . .; without waiver of either party's rights to contest and defend the necessity of submitting such an amendment, in light of this Court's approval of the settlement agreement pursuant to the Bert Harris Act and applicable law. The Court finds that the Settlement Agreement and Complete Release is fair, reasonable and adequate; is in the best interests of the parties and protects the public interest served by the Local Government Comprehensive Planning and Land Development Regulation Act. . .; and is the appropriate relief necessary to prevent the County's regulatory efforts from inordinately burdening the Property with regard to density, impact on public services, the environment and the public health, safety and welfare of the community and the rights of individuals to reasonably utilize their property and to rely on the representations of government, taking into consideration the risks that both parties had in this litigation. This litigation has been ongoing for more than 18 months, and substantial discovery and record has been presented to the Court that provides ample basis for this Court's approval of this settlement as being fair, reasonable and adequate and appropriate under the Bert Harris Act. There is no evidence before the Court that would suggest that the proposed settlement is the result of any collusion among the parties or their counsel. In fact, the record is to the contrary, whereby counsel on both sides have aggressively and zealously pursued the interests of their respective clients. . . . Judge Traynor directed the parties to implement the terms of the Settlement Agreement, "subject to the right of the public to comment at an appropriate public hearing pertaining to the above referenced small scale amendment to the County's Comprehensive Plan, and shall cooperate to accomplish in good faith the responsibilities under the Settlement Agreement and Complete Release." There is no evidence that Judge Traynor's Order has been rescinded or otherwise modified. There is no statutory authority to collaterally attack Judge Traynor's Order in this proceeding nor is there any authority which provides that this Order can be ignored. Also, this is not the appropriate proceeding to determine whether Estuaries has, in fact, vested rights. Accordingly, Judge Traynor's Order, approving the Settlement Agreement, is accepted as binding authority. The Small Scale Development Application In compliance with Judge Traynor's Order and the Settlement Agreement, on March 26, 2002, Estuaries filed a "Small Scale Amendment Comprehensive Plan Amendment Application Form" with the County. Estuaries requested a change in the Property's FLUM designation from Residential Coastal A, Zoning RG-1 to Residential Coastal D, Zoning RG-1. Estuaries represented, in part, that the Property consisted of 9.99 acres of vacant land, including 3.2 acres of wetlands and approximately 6.7 acres of developable land (uplands) "which will be developed into a 56 unit Multi-Family Condominium." County staff reviewed the application and recommended approval. As part of the agenda item for consideration by the St. Johns County Board of County Commissioners, County staff, in light of the criterion of "Consistency with the Goals, Objectives and Policies of the Comprehensive Plan, State Comprehensive Plan and the Northeast Florida Regional Policy Plan," stated: "[t]he approved Settlement Agreement was filed pursuant to Chapter 70.001." With respect to "Impacts on Public Facilities and Services," County staff stated: "The project has received a Certificate of Concurrency addressing the impacts on transportation, water, sewer, recreation, drainage, solid waste and mass transit. The Certificate of Concurrency is based on impacts of 84 multi-family dwelling units. Pursuant to the Settlement Agreement, the project contains 56 multi-family dwelling units. St. Johns County provides central water and sewer." With respect to "Compatibility with Surrounding Area," County staff stated: "The area is developed with a mixture of residential, commercial, park (Butler Park), and vacant land of various zoning." According to Mr. Scott Clem, the County's Director of Growth Management Services, County staff felt that there were adequate public facilities for a 56-unit project, because Estuaries had previously demonstrated that facilities were available for an 84-unit project. However, County staff expressly noted in the Planning Department Staff Report submitted to the Planning and Zoning Agency that "[t]here are no development plans included in the Application. However, all site engineering, drainage and required infrastructure improvements will be reviewed pursuant to the Development Review Process to ensure that the development complies with all applicable federal, state and local regulations and permitting requirements. No permits shall authorize development prior to compliance with all applicable regulations." At this point in time, County staff were "analyzing the potential for 56 units to be on the property. It was a site specific analysis at that point." On April 18, 2002, the Planning and Zoning Agency unanimously recommended approval of the FLUM amendment. After a properly noticed public hearing, on May 28, 2002, the County approved the FLUM Amendment in Ordinance 2002- 31. In Ordinance 2002-31, the County approved the FLUM Amendment at issue, which changed the FLUM land use classification of the Property from Residential Coastal A to Residential Coastal D. Ordinance 2002-31 also provided: "The Land Uses allowed by this Small Scale Comprehensive Plan Amendment shall be limited to not more than 56 residential units, built in not more than four buildings with residential uses, not more than 35 feet in height." The Challenge Parker filed an Amended Petition challenging the lack of data and analysis to support the FLUM Amendment; challenging the increase in density of the Property located in a Coastal High Hazard Area; challenging the internal consistency of the FLUM Amendment with the May 2000 EAR-Based Plan Amendment; challenging the decision by the County to process the application as a small scale development amendment; and challenging the failure to provide Parker with adequate notice of a clear point of entry to challenge Ordinance No. 2002-31. Notice The County provided notice, by newspaper, of the Board of County Commissioners' meeting of May 28, 2002. Before this meeting, a sign was placed on the Property, providing notice of the meeting. Parker personally attended the May 28, 2002, meeting and addressed the Commission regarding the FLUM Amendment. Ordinance No. 2002-31 provided: "This ordinance shall take effect 31 days after adoption. If challenged within 30 days after adoption, this ordinance shall not become effective until the state land planning agency or the Administration Commission issues a final order determining the adopted small scale amendment is in compliance." This Ordinance does not advise a person of the right to challenge the Ordinance pursuant to Chapter 120, Florida Statutes, the Uniform Rules of Procedure, or Section 163.3187(3)(a), Florida Statutes. This type of notice is not required for the reasons set forth in the Conclusions of Law. Does the FLUM Amendment, covering 9.99 acres, involve a "use" of 10 acres or fewer, pursuant to Section 163.3187(1)(c)1., Florida Statutes? "A small scale development amendment may be adopted only [if] [t]he proposed amendment involves a use of 10 acres or fewer." Section 163.3187(1)(c)1., Florida Statutes.2 In the Amended Petition and in her Prehearing Stipulation, Parker contends that the "use," which is the subject of the FLUM Amendment, relates to more than the 9.99 acre parcel and, therefore, the FLUM Amendment is not a small scale development amendment defined in Section 163.3187(1)(c)1., Florida Statutes. Parker contended that because the FLUM Amendment authorizes a maximum of 56 residential units to be developed on the Property, and the maximum density under the Residential Coastal D and RG-1 zoning designations is 42.12 units, using the on-site wetlands density bonus, that Estuaries "must be using the off-site wetlands that are contained within the 18.5 acre parcel to obtain the density credit necessary to reach 56 units for the site under" the FLUM Amendment. The 56 residential unit maximum was the product of the circuit court litigation and Settlement Agreement, as approved by Judge Traynor, which resolved the differences between the County and Estuaries regarding the maximum residential density which could be authorized on the Property. Parker also contended that because Estuaries may use a proposed lift station owned by the County off-site, that this causes the proposed "use" of the Property to exceed 10 acres. It appears that at some prior time in the "vesting rights" chronology of events, Magnolia S Corporation, in order to downscale the project, agreed to sell a 40' by 80' parcel to the County, located adjacent to the Property and in the northeast portion, to expand the existing County lift station on Riverside Boulevard. There is a lift station adjacent to the Property that serves as "a repump station that serves the development along Riverside [Boulevard] west of the lift station and serves all the development in St. Johns County on the island south of Riverside Boulevard." It is proposed that sewage effluent from development on the Property would be deposited on site and then pumped into an adjacent force main which eventually ends up in the station. According to Mr. Kevin Davenport, Estuaries' civil engineer, "56 units added to that pump station would be extremely miniscule in the overall amount of sewage that goes through it." Thus, Estuaries anticipates having their own on-site lift station, which "would be pumped through a pipe to the Riverside right-of- way, where it would connect to an existing county-owned pipe which currently goes to the lift station." Mr. Clem stated that "[u]tilities are very commonly done off site where water or sewer distribution or transmission lines are constructed to the site." This would include the use of off- site lift stations. However, the proposed use of the lift station does not necessarily compel the conclusion that the FLUM Amendment exceeds 9.99 acres. If this were so, any proposed use of any off-site utilities would cause a pro rata calculation and increase of the size of the site providing the service, then be added to the 9.99 acres. This is not a reasonable construction of Section 163.3187(1)(c)1., Florida Statutes. Parker also claimed that when the Estuaries granted the County a Conservation Easement for the approximately 8.5 acres (out of 18.5 acres) of wetlands adjacent to the Property, Estuaries "used" this property to secure the FLUM Amendment, and therefore, exceeded the 9.99 acres. The Conservation Easement precludes development activity on the approximately 8.51 acres. ("The purpose of this Conservation Easement is to assure that the Property will be retained forever in its existing natural condition and to prevent any use of the Property that will impair or interfere with the environmental value of the property." Prohibited uses include "[a]ctivities detrimental to drainage, flood control, water conservation, erosion control, soil conservation, or fish and wildlife habitat preservation.") The "use" of the 8.51 acres as a potential visual amenity for potential residents on the Property is not a "use" within a reasonable reading of Section 163.3187(1)(c)1., Florida Statutes. Parker also suggested that Estuaries will need to improve Riverside Boulevard (paving and drainage) and the public right-of-way consisting of approximately 1.51 acres, which is not owned by Estuaries. It appears that Riverside Boulevard is already open, improved, and paved. Also, Mr. Clem stated that it is common to have off-site improvements associated with a project, which might include intersection or roadway improvements that are not on or within the project site. Mr. Clem opined that while these improvements would be required for the project, they would have been off-site. Some improvements, such as improvements to Riverside Boulevard, would most likely benefit the general public, and not be limited to the future residents on the Property. It is common for local governments to require improvements to public infrastructure as a condition of development. These off-site improvements do not necessarily make the "development activity" larger than the size of the landowner's site, here the Property. Data and Analysis Parker contended that the FLUM Amendment is not supported by appropriate data and analysis. As noted herein, Estuaries sought approval of a FLUM Amendment for its Property, i.e., a land use change to the FLUM. No text (goals, objectives, and policies) changes to the May 2000 EAR-Based Amendment were requested nor made. This is normal for a "site-specific small scale development activity." Section 163.3187(1)(c)1.d., Florida Statutes. Consideration of the FLUM Amendment in this proceeding is unusual for several reasons. First, the necessity for the FLUM change arose as a result of the Settlement Agreement, approved by Judge Traynor, which resolved the differences existing between the County and Estuaries regarding the number of units which could, as a maximum number, be developed on the Property. Second, the data and analysis, which normally is presented to the local government, here the County, at the time the plan amendment is adopted, is not in its traditional format here, largely, it appears, because of the manner in which consideration of the FLUM Amendment arose. Nevertheless, this situation is not fatal for, under existing precedent, see, e.g., Conclusion of Law 96, data, which was in existence at the time the FLUM Amendment was adopted by the County, may be considered in determining whether there is, in fact, adequate data supporting the FLUM Amendment. The data relied on by the County and Estuaries to support the FLUM Amendment was compiled and initially presented to the County on or about July 6, 1999, when Estuaries sought authorization from the County for a proposed project to construct 84 multi-family residential units on the same general area as the Property. This started the County's development review process. Estuaries began the process at this time, believing that it had "vested rights" to develop the Property. Mr. Clem explained that the development review process is "extremely detailed. It involves 11 or 12 different programs within the [C]ounty, looking at everything from the actual site plan itself, water and sewer provision, for all the things that would go into site construction, roadway design, the environmental considerations. We basically look at how this site will be developed in accordance with the land development code and any other regulations. We ensure that the water management district permits are obtained, if applicable, or other state agencies." This record contains County Department comments which pertain to a host of issues, including but not limited to, drainage, traffic, fire services, urban forestry (trees and landscape on-site), utilities, zoning (e.g., buffers, setbacks), concurrency requirements, etc. County staff raised questions (identified as submittals) on at least four separate occasions followed by written responses by the applicant on at least three occasions. However, not all issues were resolved. A July 1999, Land Development Traffic Assessment, prepared by Beachside Consulting Engineers, Inc., was submitted to the County as part of the request for a concurrency determination. The analysis "indicates that the roadway segments within the impact area will continue to operate at an acceptable LOS through the construction of this project." The "Summary" of the assessment states: "This project meets traffic concurrency standards, as defined by the St. Johns County Concurrency Management Ordinance, for all roads within the traffic area." "Stormwater Calculations" for the 84-unit, multi-family housing development were also provided in a report dated July 7, 1999. The applicant also furnished the County with a "geotechnical report," which analyzed the soil conditions related to storm water ponds and to the placement of the buildings and the support of the buildings on the site. Soil borings and other testing revealed the capabilities of the soil for, for example, percolation rates for the storm water ponds. There is no evidence that there are any specific historic buildings or geological or archeological features on the Property. In July 1999, the applicant submitted an application for concurrency. At that time, County staff analyzed this information to ensure that public facilities and services were in place to serve the project. This application was reviewed in relation to the County's concurrency management provisions of the County's Land Development Code. On September 3, 1999, the County's Planning Department prepared a report regarding this application and recommended "approval of a Final Certificate of Concurrency with Conditions for the development of 84 residential condominium units." (Staff made findings of fact, which included a discussion of traffic, potable water/sanitary sewer, drainage, solid waste, and mass transit.) On September 8, 1999, the Concurrency Review Committee met and adopted the Staff's Findings of Fact with conditions, including but not limited to, the applicant providing a copy of the Department of Environmental Protection permits "necessary for connection to central water and wastewater service prior to Construction Plan approval," and "[t]he applicant receiving approval of construction/drainage plans from the Development Services Department prior to commencement of construction." The Final Certificate of Concurrency with Conditions was issued on October 1, 1999, and was due to expire on September 8, 2001. However, the Settlement Agreement provided, in part, that "the existing certificate of concurrency and the terms of the vesting letter as it relates to the Land development Code, of Sonya Doerr dated September 27, 1999, shall continue to apply." (Emphasis added.) (Ms. Teresa Bishop's (County Planning Director) November 7, 2001, letter indicated, in part, that Estuaries' request for "tolling [of the Final Certificate of Concurrency] cannot be reviewed until the outcome of the pending litigation is known. . . . After the litigation is concluded, your request for tolling may be resubmitted for review." The Settlement Agreement post-dates this letter.) In evaluating a small scale plan amendment, County staff evaluates the availability of public services which, according to Mr. Clem, is "one of the major components," and County staff "is looking at virtually the same issues that [the County] would look at in concurrency to evaluate and make recommendations on small scale amendments." Mr. Clem also advised that the County's analysis of the 84-unit project did not involve, and was not based on, "a specific site plan with buildings at a certain location or parking in a certain location. It was more an 84- unit project with certain data and analysis associated with that site or project." By letter dated October 4, 1999, the Department of Environmental Protection indicated that it had received a "Notification for Use of the General Permit for Construction of an Extension to a Drinking Water Distribution System" submitted for the Estuaries project. The Department stated further: "After reviewing the notice, it appears that your project will have minimal adverse environmental effect and apparently can be constructed pursuant to a general permit as described in Chapter 62-555, F.A.C." The permit expires on October 4, 2004. This permit allows the applicant to demonstrate that it will offer a central water service, available to be served through the County's utility department. This would ensure that there is sufficient potable water available. By letter dated October 6, 1999, the Department of Environmental Protection also issued a permit for the construction of a sewage collection/transmission system (domestic waste). By letter dated November 11, 1999, the St. Johns Water Management District issued a "formal permit for construction and operation of stormwater management system." This permit authorized "[a] new stormwater system with stormwater treatment by wet detention to serve Estuaries Multi-family Development, a 5.88 acre project to be constructed as per plans received by the District on 7/12/1999." This permit did not relieve the applicant "from the responsibility for obtaining permits from any federal, state, and/or local agencies asserting concurrent jurisdiction over this work." Mr. Clem believed that this permit was evidence that "the state agencies ha[d] considered the environmental issues relating to storm water and all the issues that they deal with in issuing a permit." The Property is located in a "development area boundary" as indicated on the FLUM, which means that these areas allow "development potential." Other areas, such as rural silviculture and agricultural lands, are outside the development area and only limited and low density development is allowed. Conservation areas are also designated on the FLUM. Given the location of the Property within the development area boundary, the County thereby eliminated the necessity of producing some of the data normally required.3 Mr. Clem explained: So by being within a development area boundary it's in essence already had rights to develop, depending on the classification what those rights are, whether it's residential, commercial, industrial. So by virtue of the fact that this site [the Property] was already in the developmental boundary, we didn't deal with issues such as need, which is a big issue in the county when we add developmental boundary. Is there need for additional residential units, and so forth. So that is one part of the answer. The other part is when we're looking at changing from one residential classification to another, we're not dealing with the same issues we might have if it was going from residential to commercial or residential to industrial. So in the context of a plan amendment like this, we're looking at what can this land support in terms of density and are there public facilities available? Is it generally compatible with the surrounding area? What are the potential impacts to natural resources? So those things are still analyzed, but they're done in a probably more confined context. And then the other factor is this being a small scale amendment further reduces the amount of data that is typically done. And if it was a major amendment, there's a whole new range of issues when we deal with major amendments. By definition, they can cause more of an impact. For Mr. Clem, the data and analysis which was generated during the concurrency process for the proposed 84-unit project was significant and would be applicable to a proposed 56-unit project. Mr. Clem opined that the data for this small scale amendment was "[f]ar in excess of anything [he had] seen in the county." Environmental Impacts of the FLUM Amendment The area on and around the Estuaries' property is an area of tidal marsh intermixed with upland scrub. Many wildlife species have been seen utilizing the wetlands on and adjacent to the Estuaries' site (the 18.5 acre parcel). These include woodstorks, snowy egrets, roseate spoonbills, little blue herons, tri-colored herons, white ibis, and ospreys. Owls, foxes, raccoons, opossums, fiddler crabs, clams, fish, shrimp, and turtles also frequent the area. Parker's environmental scientist and ecologist, Mr. Robert Burks, testified to the environmental effects of any development of the Property subject to the FLUM Amendment. Mr. Burks has worked with American Institute of Certified Planners (A.I.C.P.) designated planners, providing them with opinions with respect to environmental issues. But he is not an expert in land use planning. The National Estuarine Research Reserve (NERR) is a program of the National Oceanic and Atmospheric Administration, a federal program administered by the Department of Environmental Protection. It is a program to do research and education on estuarine systems. The estuarine ecosystem composed of the Guana, Tolomato, and Matanzas Rivers has been designated as a NERR. There is testimony that development and increases in population in the area, in general, have been responsible for, for example, the decline and closure of shell-fishing and decline of water quality in the area. Conservation Goal E.2 provides: The County shall conserve, utilize, and protect the natural resources of the area, including air, water, wetlands, water wells, estuaries, water bodies, soils, minerals, vegetative communities, wildlife, wildlife habitat, groundwater recharge areas and other natural and environmental resources, insuring that resources are available for existing and future generations. Objective E.2.2 provides: Native Forests, Floodplains, Wetlands, Upland Communities, and Surface Water The County shall protect native forests, floodplains, wetlands, upland communities, and surface waters within the County from development impacts to provide for maintenance of environmental quality and wildlife habitats. Policy E.2.2.5.(a)(1)(b) provides: The County shall protect Environmentally Sensitive lands (ESLs) through the establishment of Land Development Regulations (LDRs) which address the alternate types of protection for each type of Environmentally Sensitive Land. Adoption and implementation of the Land Development Regulations shall, at a minimum, address the following issues: For Wetlands, Outstanding Florida Waters (OFW), and Estuaries: establish and modify buffers between the wetlands/ OFW/ estuaries and upland development as stated in the County's Land Development Regulations (LDRs), and as follows: * * * Except a minimum of a 50 ft. natural vegetative upland buffer shall be required and maintained between the development areas and the St. Johns, Matanzas, Guana and Tolomato Rivers and their associated tributaries, streams and other interconnecting water bodies. Policy E.2.2.13(b)(6) provides: By December 1999, the County shall develop and adopt guidelines and standards for the preservation and conservation of uplands through various land development techniques as follows: (b) The County shall recognize the following vegetative natural communities as Significant Natural Communities Habitat. Due to the rarity of these vegetative communities, a minimum of 10 percent of the total acreage of the Significant Natural Communities Habitat (excluding bona fide agriculture and/or silviculture operations) shall be preserved and maintained by the development. * * * (6) Scrub. Where on-site preservation of the native upland communities are not feasible, the County as an alternative shall accept a fee in lieu of preservation or off-site mitigation in accordance with the County Land Development Regulations. Mr. Burks opined that "generally," and if Goal E.2 is read "literally", the FLUM Amendment did not meet this Goal and afford protection for wetlands, vegetative communities, estuaries, wildlife and wildlife habitat. He perceives that "[a]nytime there's a development there will be impacts to the estuarine--the water bodies because of surficial runoff from the parking lots, from the impervious surfaces, and it will carry pollutants into those areas. And that includes soils also. . . . As far as upland habitat, when you develop an area like this, unless you leave certain parts, the upland habitat will be negatively impacted obviously. There won't be the trees there, the vegetation that was normally there before the development." For Mr. Burks, any development of the Property would generally be inconsistent with the Plan provisions recited above. But, his opinion is specifically based on how each system or plan for the site, or here, the Property, is actually designed--"it would depend on the design of the housing structures themselves and where they were placed. If you design anything in a manner which is going to protect that buffer and literally protect the water quality and the runoff in that area, then you may--it may not violate it." For example, if the Property were developed with 25-foot buffers instead of 50-foot buffers, Mr. Burks says that, from an ecology standpoint, there would be insufficient protection for wildlife, including threatened and endangered species. He offered the same opinion if the FLUM Amendment did not require a minimum ten percent set aside of the total acreage for significant natural communities habitat on the Property, such as, scrub of approximately 6.7 acres, a protected vegetative community existing on the upland portion of the Property. Furthermore, Parker introduced into evidence proposed site plans for the Property dated May 24, 2002, which show, in part, a 25-foot buffer, not a 50-foot buffer.4 Parker contends that these site plans are the best available data and analysis regarding whether the FLUM Amendment is "in compliance." However, the purpose of this proceeding is to determine whether the FLUM Amendment is "in compliance," not whether specific draft, and not approved, site plans are "in compliance" with the May 2000 EAR-Based Plan Amendment or the LDRs. If site plans are approved and a development order issued by the County, Parker, and any other aggrieved or adversely affected party may file a challenge pursuant to Section 163.3215, Florida Statutes. But, this is not the appropriate proceeding to challenge proposed site plans. This is not to say that proposed site plans cannot be considered data and analysis; only that they are not incorporated in the FLUM Amendment and are not subject to challenge here. See The Sierra Club, et al. v. St. John County, et al., Case Nos. 01- 1851GM and 01-1852GM (Recommended Order May 20, 2002; Final Order July 30, 2002). Internal Consistency Parker contended that the FLUM Amendment is inconsistent with several provisions of the May 2000 EAR-Based Plan Amendment. Some of these issues have been discussed above in Findings of Fact 68 to 80, pertaining to environmental considerations. Another issue is whether the FLUM Amendment, which changes the maximum density on the Property, is inconsistent with Policy E.1.3.11 which provides: "The County shall not approve Comprehensive Plan Amendments that increase the residential density on the Future Land Use Map within the Coastal High Hazard Area." See also Policy A.1.5.6 which offers almost identical language. The FLUM Amendment changes the land use designation of the Property, and allows a land use "limited to not more than 56 residential units, built in not more than four buildings with residential uses, not more than 35 feet in height," and thus allows a potential increase in the density of the Property, located in the Coastal High Hazard Area. This resulted from the Settlement Agreement. In Policy A.1.11.6, [t]he County recognizes that the Plan's Objectives and Policies sometime serve to support competing interests. Accordingly, in such instances, and in the absence of a mandatory prohibition of the activity at issue, it is the County's intent that the Plan be construed as a whole and that potentially competing Objectives and Policies be construed together so as to render a balanced interpretation of the Plan. It is the further intent that the County interpretation of the Plan, whether by County staff, the Planning & Zoning Agency, or the Board of County Commissioners, shall be afforded appropriate deference. County interpretations of the Plan which balance potentially competing Objectives and Policies shall not be overturned in the absence of clear and convincing evidence that the County interpretation has misapplied the Plan construed as a whole. The May 2000 EAR-Based Plan Amendment Goals, Objectives, and Policies must be read in their entirety and individual provisions cannot be read in isolation. Objective E.1.3 requires the County to engage in "post disaster planning, coastal area redevelopment, and hurricane preparedness. The County shall prepare post-disaster redevelopment plans which reduce or eliminate the exposure of human life and public and private property to natural hazards." Mr. Clem opined that Policy E.1.3.11, see Finding of Fact 81, expressed "the general intent of limiting population increases that would result in adverse impacts to hurricane evacuation of the coastal areas," and, in particular, the "barrier islands." (Policy E.1.9.5, under Objective E.1.9 Hurricane Evacuation Time, provides: "St. Johns County shall attempt to limit the density within the Coastal High Hazard Area as allowed by law.") Mr. Clem further stated that the FLUM Amendment, which restricted the Property to a maximum of 56 residential units, from a possible 116 unit maximum, was consistent with the Policy which restricts density within the coastal hazard zone. In rendering his opinions, Mr. Clem balanced the above- referenced Policies with Objective A.1.16, pertaining to "private property rights." When these May 2002 EAR-Based Plan Amendment provisions are read together, it appears that Mr. Clem's interpretations are not unreasonable.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be issued by the Department of Community Affairs concluding that the FLUM Amendment adopted by St. Johns County in Ordinance No. 2002-31 is "in compliance" as defined in Chapter 163, Part II, Florida Statutes, and the rules promulgated thereunder. DONE AND ENTERED this 17th day of December, 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of December, 2002.

Florida Laws (8) 120.569163.3177163.3180163.3184163.3187163.3215163.324570.001
# 6
BECKY AYECH vs SARASOTA COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 02-003898GM (2002)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Oct. 03, 2002 Number: 02-003898GM Latest Update: Aug. 16, 2004

The Issue The issue is whether a Sarasota County plan amendment adopted by Ordinance No. 2001-76 on July 10, 2002, is in compliance.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background The County's original Plan, known as Apoxsee,2 was adopted in 1981. In 1989, the County adopted a revised and updated version of that Plan. The current Plan was adopted in 1997 and is based on an Evaluation and Appraisal Report (EAR) approved by the County on February 20, 1996. After a lengthy process which began several years earlier, included input from all segments of the community, and involved thousands of hours of community service, on February 28, 2002, the County submitted to the Department a package of amendments comprised of an overlay system (with associated goals, objectives, and policies) based on fifty- year projections of growth. The amendments were in response to Future Land Use Policy 4.7 which mandated the preparation of a year 2050 plan for areas east of Interstate 75, which had served as an urban growth boundary in the County since the mid-1970s. Through the overlays, the amendments generally established areas in the County for the location of villages, hamlets, greenways, and conservation subdivisions. On May 10, 2002, the Department issued its Objections, Recommendations, and Comments (ORC). In response to the ORC, on July 10, 2002, the County enacted Ordinance No. 2001-76, which included various changes to the earlier amendment package and generally established six geographic overlay areas in the County, called Resource Management Areas (RMAs), with associated goals, objectives, and policies in the Future Land Use Chapter. The RMAs include an Urban/Suburban RMA, an Economic Development RMA, a Rural Heritage/Estate RMA, a Village/Estate/Open Space RMA, a Greenway RMA, and an Agriculture/Reserve RMA. The amendments are more commonly known as Sarasota 2050. The revised amendment package was transmitted to the Department on July 24, 2002. On September 5, 2002, the Department issued its Notice of Intent to find the amendments in compliance. On September 26, 2002, Manasota-88, Compton, and Ayech (and four large landowners who subsequently voluntarily dismissed their Petitions) filed their Petitions challenging the new amendments. In their Pre-Hearing Stipulation, Manasota-88 and Compton contend that the amendments are not in compliance for the following reasons: vagueness and uncertainties of policies; an inconsistent, absent or flawed population demand and urban capacity allocation methodology; inconsistent planning time frames; overallocation of urban capacity; urban sprawl; failure to coordinate future land uses with planned, adequate and financially feasible facilities and services; failure to protect wetlands, wildlife and other natural resources; failure to meet requirements for multimodal and area-wide concurrency standards; failure to provide affordable housing; land use incompatibility of land uses and conditions; indefinite mixed uses and standards; lack of intergovernmental coordination; and inadequate opportunities for public participation the Amendment is internally inconsistent within itself and with other provisions of the Sarasota County Comprehensive Plan, is not supported by appropriate data and analysis and is inconsistent with the State Comprehensive Plan and the Strategic Regional Policy [P]lan of the Southwest Regional Planning Council. In the Pre-Hearing Stipulation, Ayech has relied on the same grounds as Manasota-88 and Compton (except for the allegation that the amendments lack intergovernmental coordination). In addition, she has added an allegation that the amendments fail to adequately plan "for hurricane evacuation." The Parties The Department is the state planning agency responsible for review and approval of comprehensive plans and amendments. The County is a political subdivision responsible for adopting a comprehensive plan and amendments thereto. The County adopted the amendments being challenged here. At the commencement of the hearing, the parties stipulated that Petitioners either reside, own property, or own or operate a business within the County, and that they made comments, objections, or recommendations to the County prior to the adoption of the Amendment. These stipulated facts establish that Petitioners are affected persons within the meaning of Section 163.3184(1)(a), Florida Statutes, and have standing to initiate this action. Given the above stipulation, there was no testimony presented by Manasota-88 describing that organization's activities or purpose, or by Compton individually. As to Ayech, however, she is a resident of the County who lives on a 5-acre farm in the "Old Miakka" area east of Interstate 75, zoned OUE, which is designated as a rural classification under the Plan. The activities on her farm are regulated through County zoning ordinances. The Amendment Generally Under the current Plan, the County uses a number of growth management strategies including, but not limited to: an urban services area (USA) boundary; a minimum residential capacity "trigger" mechanism, that is, a minimum dwelling unit capacity of 133 percent of housing demand projected for a ten- year plan period following each EAR, to determine when the USA boundary may need to be moved; a future urban area; and concurrency requirements. Outside the USA, development is generally limited to no greater than one residential unit per five acres in rural designated areas or one unit per two acres in semi-rural areas. The current Plan also includes a Capital Improvement Element incorporating a five-year and a twenty-plus-year planning period. The five-year list of infrastructure projects is costed and prioritized. In the twenty-plus-year list, infrastructure projects are listed in alphabetical order by type of facility and are not costed or prioritized. The construction of infrastructure projects is implemented through an annual Capital Improvement Program (CIP), with projects generally being moved between the twenty-plus-year time frame and the five-year time frame and then into the CIP. All of the County's future urban capacity outside the USA and the majority of capacity remaining inside the USA are in the southern part of the County (south of Preymore Street extended, and south of Sarasota Square Mall). As the northern part of the County's urban capacity nears buildout, the County has experienced considerable market pressure to create more urban designated land in the northern part of the County and/or to convert undeveloped rural land into large lot, ranchette subdivisions. Because of the foregoing conditions, and the requirement in Future Land Use Policy 4.1.7 that it prepare a year 2050 plan for areas east of Interstate 75, the County began seeking ways to encourage what it considers to be a "more livable, sustainable form of development." This led to the adoption of Sarasota 2050. As noted above, Sarasota 2050 consists of six geographic overlay areas in the Future Land Use Map (FLUM), called RMAs, with associated goals, objectives, and policies. As described in the Plan, the purpose and objective of the Amendment is as follows: The Sarasota County Resource Management Area (RMA) Goal, Objectives and Policies are designed as a supplement to the Future Land Use Chapter of Apoxsee. The RMAs function as an overlay to the adopted Future Land Use Map and do not affect any rights of property owners to develop their property as permitted under the Comprehensive Plan, the Zoning Ordinance or the Land Development Regulations of Sarasota County or previously approved development orders; provided, however, that Policy TDR 2.2 shall apply to land located within the Rural/Heritage Estate, Village/ Open Space, Greenway and Agricultural Reserve RMAs where an increase in residential density is sought. To accomplish this purpose and objective, the RMAs and their associated policies are expressly designed to preserve and strengthen existing communities; provide for a variety of land uses and lifestyles to support diverse ages, incomes, and family sizes; preserve environmental systems; direct population growth away from floodplains; avoid urban sprawl; reduce automobile trips; create efficiency in planning and provision of infrastructure; provide County central utilities; conserve water and energy; allocate development costs appropriately; preserve rural character, including opportunities for agriculture; and balance jobs and housing. The Amendment creates an optional, alternative land use policy program in the Plan. To take advantage of the benefits and incentives of this alternative program, a property owner must be bound by the terms and conditions in the goal, objectives, and policies. Policy RMA1.1 explains it this way: The additional development opportunities afforded by the Sarasota 2050 Resource Management Area Goal, Objectives and Policies are provided on the condition that they are implemented and can be enforced as an entire package. For example, the densities and intensities of land use made available by the Sarasota 2050 Resource Management Area Goal, Objectives and Policies may not be approved for use outside the policy framework and implementing regulatory framework set forth herein. Policy RMA1.3 expresses the Amendment’s optional, alternative relationship to the existing Plan as follows: The Sarasota 2050 Resource Management Area Goal, Objectives and Policies shall not affect the existing rights of property owners to develop their property as permitted under the Comprehensive Plan, the Zoning Ordinance, the Land Development Regulations or previously approved development orders; provided, however, that TDR 2.2 [relating to transfer of development rights] shall apply to land located within the Rural Heritage/ Estate, Village/Open Space, Greenway and Agricultural Reserve RMAs where an increase in residential density is sought. If a property owner chooses to take advantage of the incentives provided by the Sarasota 2050 RMA, then to the extent that there may be a conflict between the Sarasota 2050 Resource Management Area Goal, Objectives and Policies and the other Goal[s], Objectives and Policies of APOXSEE, the Sarasota 2050 Resource Management Area Goal, Objectives and Policies shall take precedence. The other Goals, Objectives and Policies of APOXSEE including, but not limited to, those which relate to concurrency management and environmental protection shall continue to be effective after the adoption of these Resource Management Area Goal, Objectives and Policies. Therefore, if a landowner chooses to pursue the alternative development opportunities, he essentially forfeits his current development rights and accepts the terms and conditions of Sarasota 2050. The RMAs The RMAs were drawn in a series of overlays to the FLUM based on the unique characteristics of different areas of the County, and they result in apportioning the entire County into six RMAs. They are designed to identify, maintain, and enhance the diversity of urban and rural land uses in the unincorporated areas of the County. The Urban/Suburban RMA is an overlay of the USA and is comparable to the growth and development pattern defined by the Plan. Policies for this RMA call for neighborhood planning, providing resources for infrastructure, and encouraging development (or urban infill) in a portion of the Future USA identified in the Amendment as the Settlement Area. The Economic Development RMA consists of land inside the USA that is located along existing commercial corridors and at the interchanges of Interstate 75. In this RMA, the policies in the Amendment provide for facilitating economic development and redevelopment by preparing critical area plans, encouraging mixed uses, providing for multi-modal transportation opportunities, creating land development regulations to encourage economic development, and providing more innovative level of service standards that are in accordance with Chapter 163, Florida Statutes. The Greenway RMA consists of lands outside the USA that are of special environmental value or are important for environmental connectivity. Generally, the Greenway RMA is comprised of public lands, rivers and connected wetlands, existing preservation lands, ecologically valuable lands adjacent to the Myakka River system, named creeks and flow- ways and wetlands connected to such creeks and flow-ways, lands listed as environmentally sensitive under the County’s Environmentally Sensitive Lands Priority Protection Program (ESLPPP), and lands deemed to be of high ecological value. This RMA is accompanied by a map depicting the general location of the features sought to be protected. The Rural/Heritage Estate Resource Management RMA consists of lands outside the USA that are presently rural and very low density residential in character and development and are planned to remain in that form. In other words, the RMA's focus is on protecting the existing rural character of this area. To accomplish this objective, and to discourage inefficient use of land in the area, the Amendment contains policies that will create and implement neighborhood plans focusing on strategies and measures to preserve the historic rural character of the RMA. It also provides incentives to encourage the protection of agricultural uses and natural resources through measures such as the creation of land development regulations for a Conservation Subdivision form of use and development in the area. The Agricultural Reserve RMA is made up of the existing agricultural areas in the eastern and southeastern portions of the County. The Amendment contains policies that call for the amendment of the County’s Zoning and Land Development Regulations to support, preserve, protect, and encourage agricultural and ranching uses and activities in the area. Finally, the Village/Open Space RMA is the centerpiece of the RMA program. It consists of land outside the USA that is planned to be the location of mixed-use developments called Villages and Hamlets. The Village/Open Space RMA is primarily the area where the increment of growth and development associated with the longer, 2050 planning horizon will be accommodated. Villages and Hamlets are form-specific, using connected neighborhoods as basic structural units that form compact, mixed-use, master-planned communities. Neighborhoods provide for a broad range and variety of housing types to accommodate a wide range of family sizes and incomes. Neighborhoods are characterized by a fully connected system of streets and roads that encourage alternative means of transportation such as walking, bicycle, or transit. Permanently dedicated open space is also an important element of the neighborhood form. Neighborhoods are to be designed so that a majority of the housing units are within walking distance of a Neighborhood Center and are collectively served by Village Centers. Village Centers are characterized by being internally designed to the surrounding neighborhoods and provide mixed uses. They are designed specifically to serve the daily and weekly retail, office, civic, and governmental use and service needs of the residents of the Village. Densities and intensities in Village Centers are higher than in neighborhoods to achieve a critical mass capable of serving as the economic nucleus of the Village. Villages must be surrounded by large expanses of open space to protect the character of the rural landscape and to provide a noticeable separation between Villages and rural areas. Hamlets are intended to be designed as collections of rural homes and lots clustered together around crossroads that may include small-scale commercial developments with up to 20,000 square feet of space, as well as civic buildings or shared amenities. Each Hamlet is required to have a public/civic focal point, such as a public park. By clustering and focusing development and population in the Village and Hamlet forms, less land is needed to accommodate the projected population and more land is devoted to open space. The Village/Open Space RMA is an overlay and includes FLUM designations. According to the Amendment, the designations become effective if and when a development master plan for a Village or Hamlet is approved for the property. The Urban/Suburban, Agricultural Reserve, Rural Heritage/Estate, Greenway, and Economic Development RMAs are overlays only and do not include or affect FLUM designations. For these five RMAs, the FLUM designation controls land use, and any changes in use that could be made by using the overlay policies of the Amendment that are not consistent with the land's future land use designation would require a land use redesignation amendment to the Plan before such use could be allowed. Data and analysis in support of the amendment The County did an extensive collection and review of data in connection with the Amendment. In addition to its own data, data on wetlands, soils, habitats, water supplies, and drainage with the Southwest Florida Water Management District (District) and the Florida Fish and Wildlife Conservation Commission (FFWCC) were reviewed. Data from the BEBR were used in deriving population and housing demand forecasts for the 2050 planning period. Transportation system modeling was performed using data from the local Metropolitan Planning Agency (MPA). The MPA uses the Florida State Urban Transportation Model Structure (FSUTMS), which is commonly used throughout the State for transportation modeling and planning purposes. Expert technical assistance was also provided by various consulting firms, including the Urban Land Institute, Analytica, Zimmerman/Volk Associates, Inc., Urban Strategies, Inc., Duany-Plater-Zyberk, Glatting Jackson, Fishkind & Associates, Stansbury Resolutions by Design, and Kumpe & Associates. In addition, the Urban Land Institute prepared a comprehensive report on the benefits of moving towards new urbanist and smart growth forms east of Interstate 75 and a build-out 2050 planning horizon. Finally, topical reports were prepared on each of the RMAs, as well as on public participation, financial feasibility and fiscal neutrality, market analysis, and infrastructure analysis. In sum, the data gathered, analyzed, and used by the County were the best available data; the analyses were done in a professionally acceptable manner; and for reasons more fully explained below, the County reacted appropriately to such data. Petitioners' Objections Petitioners have raised a wide range of objections to the Amendment, including a lack of data and analyses to support many parts of the Amendment; flawed or professionally unacceptable population and housing projections; a lack of need; the encouragement of urban sprawl; a lack of coordination between the future land uses associated with the Amendment and the availability of capital facilities; a flawed transportation model; a lack of meaningful and predictable standards and guidelines; internal inconsistency; a failure to protect natural resources; a lack of economic feasibility and fiscal neutrality; and inadequate public participation and intergovernmental coordination. Use of a 50-year planning horizon Petitioners first contend that the Amendment is not in compliance because it has a fifty-year planning time frame rather than a five or ten-year time frame, and because it does not have the same time frame as the Plan itself. Section 163.3177(5)(a), Florida Statutes, provides that "[e]ach local government comprehensive plan must include at least two planning periods, one covering at least the first 5-year period occurring after the plan's adoption and one covering at least a 10-year period." See also Fla. Admin. Code R. 9J-5.005(4). However, nothing in the statute or rule prohibits a plan from containing more than two planning horizons, or for an amendment to add an additional fifty-year planning period. Therefore, the objection is without merit. Population and housing need projections For a fifty-year plan, the County had to undertake an independent analysis and projection of future population in the County. In doing so, the County extrapolated from BEBR medium range 2030 projections and calculated a need for 82,000 new homes over the 2050 period. Examining building permit trends over the prior ten years, the County calculated a high- end projection of 110,000 new homes. The County developed two sets of estimates since it is reasonable and appropriate to use more than one approach to produce a range of future projections. The County based its planning on the lower number, but also assessed water needs relative to the higher number. The data and sources used by the County in making the population and housing need projections are data and sources commonly used by local governments in making such projections. The County's expert demographer, Dr. Fishkind, independently evaluated the methodologies used by the County and pointed out that the projections came from the BEBR mid- range population projections for the County and that, over the years, these projections have been shown to be reliably accurate. The projections were then extended by linear extrapolation and converted to a housing demand in a series of steps which conformed with good planning practices. The projections were also double-checked by looking at the projected levels of building permits based on historical trends in the previous ten years' time. These two sets of calculations were fairly consistent given the lengthy time frame and the inherent difficulty in making long-range forecasts. Dr. Fishkind also found the extrapolation from 2030 to 2050 using a linear approach to be appropriate. This is because medium-term population projections are linear, and extrapolation under this approach is both reasonable and proper. Likewise, Dr. Fishkind concluded that comparing the projections to the projected level of building permits based on historical trends is also a reasonable and acceptable methodology and offers another perspective. Manasota-88's and Compton's expert demographer, Dr. Smith, disagreed that the County’s methodology was professionally acceptable and opined instead that the mid- range 2050 housing need was 76,800 units. He evidently accepted the BEBR mid-range extrapolation done by the County for the year-round resident population of the County through 2050, but disagreed on the number of people associated with the functional population of the County. To calculate the actual number of persons in the County and the number of homes necessary to accommodate those persons, it is necessary to add the persons who reside in the County year-round (the "resident population") to the number of people who live in the County for only a portion of the year (the "seasonal population"). See Fla. Admin. Code R. 9J- 5.005(2)(e)("The comprehensive plan shall be based on resident and seasonal population estimates and projections.") The BEBR projections are based on only the resident population. The County’s demographer assigned a 20 percent multiplier to the resident population to account for the seasonal population. This multiplier has been in the Plan for many years, and it has been used by the County (with the Department's approval) in calculating seasonal population for comprehensive planning purposes since at least 1982. Rather than use a 20 percent multiplier, Dr. Smith extrapolated the seasonal population trend between the 1990 census and the 2000 census and arrived at a different number for total county housing demand. Even so, based on the fifty- year time frame of the Amendment, the 2050 housing demand number estimated by Dr. Smith (76,800 units) is for all practical purposes identical to the number projected by the County (82,000). Indeed, Dr. Fishkind opined that there is no statistically significant difference between the County's and Dr. Smith's projections. Section 163.3177(6)(a), Florida Statutes, requires that "[t]he future land use plan shall be based upon surveys, studies, and data regarding the area, including the amount of land required to accommodate anticipated growth [and] the projected population of the area." The "need" issue is also a factor to be considered in an urban sprawl analysis. See Fla. Admin. Code R. 9J-5.006(5)(g)1. (urban sprawl may be present where a plan designates for development "uses in excess of demonstrated need"). There is no allocation ratio adopted by statute or rule by which all comprehensive plans are judged. The County's evidence established that the allocation ratio of housing supply to housing need associated with the best-case scenario, that is, a buildout of existing areas and the maximum possible number of units being approved in the Villages, was nearly 1:1. Adding the total number of remaining potential dwelling units in the County at the time of the Amendment, the total amount of potential supply for the 2050 period was 82,500 units. This ratio is more conservative than the ratios found in other comprehensive plans determined to be in compliance by the Department. In those plans, the ratios tend to be much greater than 1:1. Petitioners objected to the amount of allocation, but offered no independent allocation ratio that should have been followed. Instead, Manasota-88's and Compton's expert undertook an independent calculation of potential units which resulted in a number of units in excess of 100,000 for the next twenty years. However, the witness was not capable of recalling, defending, or explaining these calculations on cross-examination, and therefore they have been given very little weight. Moreover, the witness clearly did not factor the transfer of density units or the limitations associated with the transfer of such units required by the policies in the Amendment for assembling units in the Villages. Given these considerations, it is at least fairly debatable that Sarasota 2050 is based on relevant and appropriate population and housing need projections that were prepared in a professionally acceptable manner using professionally acceptable methodologies. Land use suitability Petitioners next contend that the identification of the RMAs is not based on adequate data and analyses of land use suitability. In this regard, Section 163.3177(6)(a), Florida Statutes, requires that future land use plans be based, in part, on surveys, studies, and data regarding "the character of undeveloped land." See also Fla. Admin. Code R. 9J-5.006(2), which sets forth the factors that are to be evaluated when formulating future land use designations. The Amendment was based upon a land use suitability analysis which considered soils, wetlands, vegetation, and archeological sites. There is appropriate data and analyses in the record related to such topics as "vegetation and wildlife," "wetlands," "soils," "floodplains," and "historical and archeological sites." The data were collected and analyzed in a professionally acceptable manner, and the identification of the RMAs reacts appropriately to that data and analyses. The County's evidence demonstrated that the locations chosen for the particular RMAs are appropriate both as to location and suitability for development. It is at least fairly debatable that the Amendment is supported by adequate data and analyses establishing land use suitability. Urban sprawl and need Petitioners further contend that the Amendment fails to discourage urban sprawl, as required by Florida Administrative Code Rule 9J-5.006(5), and that it is not supported by an appropriate demonstration of need. Need is, of course, a component of the overall goal of planning to avoid urban sprawl. The emerging development pattern in the northeast area of the County tends toward large-lot development. Here, the RMA concept offers a mixture of uses and requires an overall residential density range of three to six units per net developable Village acre, whereas most of the same residential areas of the County presently appear to have residential densities of one unit per five acres or one unit per ten acres. If the Villages (and Hamlets) are developed according to Plan, they will be a more desirable and useful tool to fight this large-lot land use pattern of current development and constitute an effective anti-urban sprawl alternative. Petitioners also allege that the Amendment will allow urban sprawl for essentially three reasons: first, there is no "need" for the RMA plan; second, there are insufficient guarantees that any future Village or Hamlet will actually be built as a Village or similar new urbanist-type development; and third, the Amendment will result in accelerated and unchecked growth in the County. The more persuasive evidence showed that none of these concerns are justified, or that the concerns are beyond fair debate. The Amendment is crafted with a level of detail to ensure that a specific new urbanist form of development occurs on land designated as Village/Open Space land use. (The "new urbanistic form" of development is characterized by walkable neighborhoods that contain a diversity of housing for a range of ages and family sizes; provide civic, commercial, and office opportunities; and facilitate open space and conservation of natural environments.) The compact, mixed-use land use pattern of the Villages and Hamlets is regarded as Urban Villages, a development form designed and recognized as a tool to combat urban sprawl. "New town" is defined in Florida Administrative Code Rule 9J-5.003(80) as follows: "New town" means a new urban activity center and community designated on the future land use map and located within a rural area or at the rural-urban fringe, clearly functionally distinct or geographically separated from existing urban areas and other new towns. A new town shall be of sufficient size, population and land use composition to support a variety of economic and social activities consistent with an urban designation. New towns shall include basic economic activities; all major land use categories, with the possible exception of agricultural and industrial; and a centrally provided full range of public facilities and services. A new town shall be based on a master development plan, and shall be bordered by land use designations which provide a clear distinction between the new town and surrounding land uses. . The Village/Open Space RMA is consistent with and furthers the concept embodied in this definition, that is, the creation of an efficient urban level of mixed-use development. Urban Villages referenced in the Rule are also a category and development form expressly recognized to combat urban sprawl. The Village/Open Space RMA policies include the types of land uses allowed, the percentage distribution among the mix of uses, and the density or intensity of each use. Villages must include a mix of uses, as well as a range of housing types capable of accommodating a broad range of family sizes and incomes. The non-residential uses in the Village, such as commercial, office, public/civic, educational, and recreational uses, must be capable of providing for most of the daily and weekly retail, office, civic, and governmental needs of the residents, and must be phased concurrently with the residential development of the Village. The policies set the minimum and maximum size for any Village development. Other policies establish standards for the minimum open space outside the developed area in the Village. The minimum density of a Village is three dwelling units per acre, the maximum density is six dwelling units per acre, and the target density is five dwelling units per acre. An adequate mix of non-residential uses must be phased with each phase or subphase of development. The maximum amount of commercial space in Neighborhood Centers is 20,000 square feet. Village Centers can be no more than 100 acres, the maximum amount of commercial space is 300,000 square feet, and the minimum size is 50,000 square feet. The Town Center may have between 150,000 and 425,000 square feet of gross leasable space. Villages must have sufficient amounts of non-residential space to satisfy the daily and weekly needs of the residents for such uses. Percentage minimums and maximums for the land area associated with uses in Village Centers and the Town Center are also expressed in the policies. Hamlets have a maximum density of one dwelling unit per acre and a minimum density of .4 dwelling unit per acre. The maximum amount of commercial space allowed in a Hamlet is 10,000 square feet. The number of potential dwelling units in the Village/Open Space RMA is limited to the total number of acres of land in the Village/Open Space and Greenway RMAs that are capable of transferring development rights. Calculations in the data and analyses submitted to the Department, as well as testimony at the hearing, set this number at 47,000-47,500 units once lands designated for public acquisition under the County’s ESLPPP are properly subtracted. To take advantage of the Village option and the allowable densities associated with Villages, property owners in the Village/Open Space RMA must assemble units above those allowed by the Plan's FLUM designation by acquiring and transferring development rights from the open space, the associated greenbelt and Greenway, the Village Master Plan, and other properties outside the Village. The means and strategy by which transfer sending and receiving areas are identified and density credits are acquired are specified in the Amendment. There are three village areas (South, Central, and North) in the Village/Open Space RMA, and the amendment limits the number of Villages that may be approved in each of the areas. In the South and Central Village areas, a second village cannot be approved for fifteen years after the first village is approved. The amount of village development in the South Village must also be phased to the construction of an interchange at Interstate 75 and Central Sarasota Parkway. In the North Village area, only one village may be approved. In addition, to further limit the amount and rate of approvals and development of Villages, village rezonings and master plans cannot be approved if the approval would cause the potential dwelling unit capacity for urban residential development within the unincorporated county to exceed 150 percent of the forecasted housing demand for the subsequent twenty-year period. To evaluate the housing demand for the subsequent twenty-year period, among other things, Policy VOS2.1(a)2. sets forth the following items to be considered in determining housing demand: Housing demand shall be calculated by the County and shall consider the medium range population projections of the University of Florida’s Bureau of Economic and Business Research for Sarasota County, projected growth in the Municipalities and residential building permit activity in the Municipalities and unincorporated County. Petitioners contend that Policy VOS2.1 is an illegal population methodology. However, the County established that the Policy merely sets forth factors to be considered and does not express a specific methodology. The County’s position is consistent with the language in the policy. Petitioners also contend that the policy is vague and ambiguous because the outcome of the application of the factors is not ordained (since weights are not assigned to each factor), and because building permit activity is not a valid or proper factor to consider in making housing demand projections. The evidence establishes, however, that the factors are all proper criteria to consider in making housing projections, and that a fixed assignment of weights for each item would be inappropriate. In fact, even though Manasota- 88's and Compton's demographer stated that building permit activity is not an appropriate factor to consider, he has written articles that state just the opposite. The County also established that Sumter County (in central Florida) had examined and used building permit activity in projecting population in connection with their comprehensive plan, and had done so after consulting with BEBR and receiving confirmation that this factor was appropriate. That building permit activity demonstrated that population projections and housing demand were higher in Sumter County than BEBR was projecting at the time, and that Sumter County’s own projections were more accurate than BEBR's projections. Petitioners essentially claim that the County should only use BEBR's medium range projections in calculating future housing needs. However, the evidence does not support this contention. Future housing need is determined by dividing future population by average household size. Because BEBR's medium population projections for a county include all municipalities in the county, they must always be modified to reflect the unincorporated county. Moreover, BEBR's projections are the result of a methodology that first extrapolates for counties, but then adjusts upward or downward to match the state population projection. A projection based on this medium range projection, but adjusted by local data, local information, and local trends, is a more accurate indicator of population, and therefore housing need, than simply the BEBR county-wide medium range projection. At the same time, future conditions are fluid rather than static, and the clear objective of Policy VOS2.1 is to project housing demand as accurately as possible. Assigning fixed weights to each factor would not account for changing conditions and data at particular points in time and would be more likely to lead to inaccurate projections. As specified in Policy VOS2.1, the factors can properly serve as checks or balances on the accuracy of the projections. Given that the clear intent of Policy VOS2.1 is to limit housing capacity and supply, accurately determining the housing demand is the object of the policy, and it is evident that the factors should be flexibly applied rather than fixed as to value, weight, or significance. There is also persuasive evidence that the RMA amendments can be reasonably expected to improve the Plan by providing an anti-sprawl alternative. Florida Administrative Code Rule 9J-5.006(5)(k) directly addresses this situation in the following manner: If a local government has in place a comprehensive plan found in compliance, the Department shall not find a plan amendment to be not in compliance on the issue of discouraging urban sprawl solely because of preexisting indicators if the amendment does not exacerbate existing indicators of urban sprawl within the jurisdiction. (emphasis added) Petitioners did not offer persuasive evidence to refute the fact that the RMAs would improve the existing development pattern in the County. While Petitioners alleged that the Amendment allows for the proliferation of urban sprawl in the form of low-density residential development, the evidence shows, for example, that the County's current development pattern in the USA has an overall residential density between two and three units per acre. The Rural Heritage/Estate and Agricultural Reserve RMAs may maintain or reduce the existing density found in the Plan by the transfer of development rights. The three to six dwelling units per net developable residential acre required for Village development in the Village/Open Space RMA, coupled with the Amendment's specific policies directing the location of higher density residential uses, affordable housing, and non- residential uses, provide meaningful and predictable standards for the development of an anti-sprawl land use form. They also provide a density of focused development that diminishes, rather than exacerbates, the existing potential for sprawl found in the Plan. In reaching his opinions on urban sprawl, Manasota- 88's and Compton's expert indicated that he only assessed the question of sprawl in light of the thirteen primary indicators of sprawl identified in Florida Administrative Code Rule 9J- 5.006(5)(g). Unlike that limited analysis, the County's and the Department's witnesses considered the sprawl question under all of the provisions of Chapter 163, Florida Statutes, and Florida Administrative Code Chapter 9J-5 and concluded that the Amendment did not violate the urban sprawl prohibition. As they correctly observed, there are other portions of the law that are critically relevant to the analysis of sprawl in the context of this Amendment. Urban villages described in Florida Administrative Code Rule 9J- 5.003(80) are a category and development form expressly designed to combat urban sprawl. In addition, Florida Administrative Code Rule 9J-5.006(5)(l) recognizes urban villages and new towns as two "innovative and flexible" ways in which comprehensive plans may discourage the proliferation of urban sprawl. The more persuasive evidence establishes that the Village form contained in the Amendment will discourage urban sprawl. The types and mix of land uses in the amendment are consistent with Florida Administrative Code Chapter 9J-5 and will serve to discourage urban sprawl. Therefore, it is at least fairly debatable that the Amendment does not exacerbate existing indicators of urban sprawl within the County and serves to discourage the proliferation of urban sprawl. It is also beyond fair debate that the Amendment describes an innovative and flexible planning and development strategy that is expressly encouraged and recognized by Section 163.3177(11), Florida Statutes, and Florida Administrative Code Rule 9J-5.006(5)(l) as a means to avoid and prevent sprawl. Natural resource protection and wetlands impacts Petitioners next allege that the Amendment fails to protect natural resources, as required by Florida Administrative Code Rules 9J-5.006(3)(b)4. and 9J-5.013(2)(b) and (3)(a) and (b). At a minimum, by providing for a Greenway area, clustering of development, large open space requirements, wildlife crossings, floodplain preservation and protection, greenbelts and buffers, transfers of development rights placing higher value on natural resources, best management practices, and the encouragement of development in the RMA pattern, the RMA plan creates a level of natural resource protection greater than the County’s existing Plan. Though Petitioners disagreed with the extent and breadth of the protections afforded by the Amendment, they could only point to one area where protections may not be as significant as in the Plan: wetland impacts in Villages where the Village Center is involved. On this issue, Policy VOS1.5 provides that: The County recognizes that prevention of urban sprawl and the creation of compact, mixed-use development support an important public purpose. Therefore, the approval of a Master Development Plan for a Village may permit impacts to wetlands within the Village Center itself only when it is determined that the proposed wetland impact is unavoidable to achieve this public purpose and only the minimum wetland impact is proposed. Such approval does not eliminate the need to comply with the other wetland mitigation requirements of the Environmental Technical Manual of the Land Development Regulations, including the requirement for suitable mitigation. The Board of County Commissioners will review such proposals on a case-by-case basis as part of the Master Development Plan review process. Contrary to Petitioners' claims, the Policy does not encourage wetland destruction. Impacts to wetlands with appropriate mitigation are allowed under this policy only when the impact is "unavoidable" and "the minimum impact is proposed." The term "unavoidable impact" is not an ambiguous term in the area of wetland regulation. It is not unbridled in the context of the policy, nor is it ambiguous when properly viewed in the context of the overriding concern of the amendment to "preserve environmental systems." The term "unavoidable impact" is used and has application and meaning in other wetland regulatory programs, such as the federal Clean Water Act and the regulations implementing that law. Regulations based on "unavoidable impacts," both in this policy as well as in the state and federal regulations, can be applied in a lawfully meaningful way. Considering the policies regarding environmental systems, habitats, wildlife, and their protection, especially when read in conjunction with the protections required in the Plan, the Amendment as a whole reacts appropriately to the data and can be expected to afford protection of natural resources. The Greenway RMA was based on data and analyses that generated a series of environmental resource overlays, that when completed, comprised the Greenway RMA. The overlays layered public lands, rivers and connected wetlands, preservation lands, ecologically valuable lands associated with the Myakka River system, named creeks and flow-ways, wetlands connected to such creeks and flow-ways, lands listed as environmentally sensitive under the County’s ESLPPP, lands deemed to be of high ecological value, and appropriate connections. The evidence establishes that the staff and consultants reviewed and consulted a wide range of professionally appropriate resources in analyzing and designating the Greenway RMA. Manasota-88 and Compton also contend that the Greenway RMA is inadequate in the sense that the RMA does not include all appropriate areas of the County. This claim was based on testimony that the Greenway did not include certain areas west and south of Interstate 75 in the Urban/Suburban and Economic Development RMAs, as well as a few conservation habitats (preserve areas) set aside by Development of Regional Impacts or restricted by conservation easements. However, the preserve areas and conservation easement properties will be preserved and maintained in the same fashion as the Greenway, so for all practical purposes their non-inclusion in the Greenway is not significant. The area located south of Interstate 75 was found to be the Myakka State Forest, which is in the planning jurisdiction of the City of North Port. Manasota-88's and Compton's witness (an employee of the FFWCC) also advocated a slightly different greenway plan for fish and wildlife resources, which he considered to be a better alternative than the one selected by the County. The witness conceded, however, that his alternative was only one of several alternative plans that the County could properly consider. In this regard, the County’s Greenway RMA reacts to data on a number of factors, only one of which is fish and wildlife. One important factor disregarded by the witness was the influence of private property rights on the designation of areas as greenway. While the FFWCC does not factor the rights of property owners in its identification of greenways, it is certainly reasonable and prudent for the County to do so. This is because the County’s regulatory actions may be the subject of takings claims and damages, and its planning actions are expected to avoid such occurrences. See § 163.3161(9), Fla. Stat. Petitioners also alleged that the lack of specific inclusion of the term "A-E Flood Zone" in the Greenway designation criteria of Policy GS1.1 does not properly react to the data and analyses provided in the Greenway Final Support Document. (That policy enumerates the component parts of the Greenway RMA.) Any such omission is insignificant, however, because in the Greenway RMA areas, the A-E Flood Zone and the areas associated with the other criteria already in Policy GS1.1 are 90 percent coterminous. In addition, when an application for a master plan for a Village is filed, the master plan must specifically identify and protect flood plain areas. At the same time, through fine tuning, the development review process, the open space requirements, and the negotiation of the planned unit development master plan, the remaining 10 percent of the A-E Flood Zone will be protected like a greenway. Greenway crossings The Greenway RMA is designed in part to provide habitat and corridors for movement of wildlife. In the initial drafts of the Amendment, future road crossings of the Greenway were located to minimize the amount of Greenway traversed by roads. After further review by the County, and consultation with a FFWCC representative, the number of crossings was reduced to eleven. The road crossings in the Amendment are not great in length, nor do they bisect wide expanses of the Greenway. All of the proposed crossings traverse the Greenway in areas where the Greenway is relatively narrow. Of the eleven crossings in the Greenway, three crossings presently exist, and these crossings will gain greater protection for wildlife through the design requirements of Policy GS2.4 than they would under the current Plan. Petitioners also expressed concerns with the wording of Policy GS2.4 and contended that the policy was not specific enough with regard to how wildlife would be protected at the crossings. The policy provides that Crossings of the Greenway RMA by roads or utilities are discouraged. When necessary to ensure the health, safety and welfare of the citizenry, however, transportation corridors within the Greenway RMA shall be designed as limited access facilities that include multi-use trails and prohibit non- emergency stopping except at designated scenic viewpoints. Roadway and associated utility corridors shall be designed to have minimal adverse impacts to the environment, including provisions for wildlife crossings based on accepted standards and including consideration of appropriate speed limits. Accordingly, under the policy, wildlife crossings must be designed to facilitate minimal adverse impacts on wildlife, and such designs must be "based on accepted standards." While Petitioners contended that what is required by "accepted standards" is vague and ambiguous, the County established that this language, taken individually or in the context of the policies of the Amendment, is specific and clear enough to establish that a crossing must be properly and professionally designed for the target species that can be expected to cross the Greenway at the particular location. It was also appropriate to design the crossing at the time of the construction of the crossing to best react to the species that will be expected to cross. Although Petitioners disagreed that the policy was acceptable, their witness agreed that it is essential to know what species are inhabiting a particular area before one can design a wildlife crossing that will protect the wildlife using the crossing. He further acknowledged that he typically designs crossings for the largest traveling species that his data indicates will cross the roadway. In deciding where to locate roads, as well as how they should be designed, crossings for wildlife are not the only matter with which the local government must be concerned. Indeed, if it were, presumably there would likely be no roads, or certainly far fewer places where automobiles could travel. To reflect legitimate planning, and to reasonably react to the data gathered by the local government, the County’s road network should reflect recognition of the data and an effort to balance the need for roads with the impacts of them on wildlife. The Amendment achieves this purpose. In summary, Petitioners have failed to show beyond fair debate that the crossings of the Greenway do not react appropriately to the data and analyses, or that the policies of the crossings are so inadequate as to violate the statute or rule. Transportation planning Manasota-88 and Compton next contend that the data and analyses for the transportation planning omit trips, overstate the potential intensity and density of land uses, and understate trips captured in the Villages. The transportation plan was based on use of the FSUTMS, a model recommended by the State and widely used by transportation planners for trip generation and modeling for comprehensive plan purposes. In developing the transportation plan, the County relied upon resources from the Highway Capacity Manual, the Transportation Research Board, and the Institute of Transportation Engineers. It also reviewed the data and analyses based on the modeling performed in September 2001 in the Infrastructure Corridor Plan, an earlier transportation plan used by the County. To ensure that the 2001 model was still appropriate for the Amendment, the County conducted further review and analyses and determined that the modeling was reasonable for use in connection with the Amendment even though the intensity of development eventually provided for in the Villages was less than had been analyzed in the model. The evidence supports a finding that the data was the best available, and that they were evaluated in a professionally acceptable manner. The evidence further shows that the Amendment identifies transportation system needs, and that the Amendment provides for transportation capital facilities in a timely and financially feasible manner. Transportation network modeling was performed for the County both with and without the 2050 Amendment. Based on the modeling, a table of road improvements needed to support the Amendment was made a part of the Amendment as Table RMA-1. Because the modeling factored more residential and non- residential development than was ultimately authorized by the Amendment, the identification of the level of transportation impacts was conservative, as were the improvements that would be needed. Manasota-88 and Compton correctly point out that the improvements contained in the Amendment are not funded for construction. Even so, this is not a defect in the Amendment because the improvements are not needed unless property owners choose to avail themselves of the 2050 options; if they do, they will be required to build the improvements themselves under the fiscal neutrality provisions of the Amendment. Further, the County’s CIP process moves improvements from the five-to-fifteen year horizon to the five-year CIP as the need arises. Thus, as development proposals for Villages or Hamlets are received and approved in the areas east of I-75, specific improvements would be identified and provided for in the development order, or could be placed in the County’s appropriate CIPs, as needed. The improvements necessary under the Amendment can be accommodated in the County’s normal capital improvements planning, and the transportation system associated with the Amendment can be coordinated with development under the Amendment in a manner that will assure that the impacts of development on the transportation system are addressed. It is noted that the Amendment requires additional transportation impact and improvement analysis at the time of master plan submittal and prior to approval of that plan. Accordingly, the Amendment satisfies the requirements of Chapter 163, Florida Statutes, and Florida Administrative Code Chapter 9J-5 for transportation planning. The County used the best available data and reacted to that data in a professionally appropriate way and to the extent necessary as indicated by the data. As noted above, the transportation impacts and needs were conservatively projected, and the County was likely planning for more facilities than would be needed. It is beyond fair debate that the Amendment is supported by data and analyses. Utilities Manasota-88 and Compton also contend that the Amendment is not in compliance because the policies relating to capital facilities are not supported by data and analyses, and that there is a lack of available capital facilities to meet the demand. The County analyzed data on water supplies and demands and central wastewater facilities needs under the Amendment. The data on water supplies and demands were the best available data and included the District water supply plan as well as the County's water supply master plan. The data were analyzed in a professionally acceptable manner and the conclusions reached and incorporated into the Amendment are supported by the analyses. The utilities system for water and wastewater has been coordinated in the Amendment with the County’s CIP in a manner that will ensure that impacts on the utilities are addressed. The County established that there are more than adequate permittable sources of potable water to serve the needs associated with the Amendment, and that the needed capital facilities for water and wastewater can reasonably be provided through the policies of the Amendment. The evidence showed that the Amendment provides for capital facilities for utilities in a timely and financially feasible manner. The total water needs for the County through the year 2050 cannot be permitted at this time because the District, which is the permitting state agency, does not issue permits for periods greater than twenty years. Also, there must be a demonstrated demand for the resources within a 20- year time frame before a permit will issue. Nonetheless, the County is part of a multi-jurisdictional alliance that is planning for long-term water supplies and permitting well into the future. It has also merged its stormwater, utilities, and natural resources activities to integrate their goals, policies, and objectives for long-term water supply and conservation purposes. No specific CIP for water or wastewater supplies and facilities was adopted in the Amendment. The County currently has water and wastewater plans in its Capital Improvement Element that will accommodate growth and development under the land use policies of the Plan. From the list contained in the Capital Improvement Element an improvement schedule is developed, as well as a more specific five-year CIP. Only the latter, five-year program identifies funding and construction of projects, and the only projects identified in the Capital Improvement Element are projects that the County must fund and construct. Because of the optional nature of the Amendment, supplies and facilities needed for its implementation will only be capable of being defined if and when development under the Amendment is requested. At that time, the specific capital facility needs for the development can be assessed and provided for, and they can be made a part of the County’s normal capital facilities planning under the Plan's Capital Facilities Chapter and its related policies. Policy VOS 2.1 conditions approval of Village development on demonstrating the availability and permitability of water and other public facilities and services to serve the development. Further, the Amendment provides for timing and phasing of both Villages and development in Villages to assure that capital facilities planning, permitting, and construction are gradual and can be accommodated in the County's typical capital improvement plan programs. Most importantly, the fiscal neutrality policies of the Amendment assure that the County will not bear financial responsibility for the provision of water or the construction of water and wastewater capital facilities in the Village/Open Space RMA. Supplies and facilities are the responsibility of the developers of the Villages and Hamlets that will be served. Additionally, Policy VOS3.6 requires that all irrigation in the Village/Open Space RMA (which therefore would include Villages and Hamlets) cannot be by wells or potable water sources and shall be by non-potable water sources such as stormwater and reuse water. The supplies and improvements that will be associated with the optional development allowed by the Amendment have been coordinated with the Plan and can be accommodated in the County's normal capital improvement planning. Through the policies in the Amendment, the water and wastewater facility impacts of the Amendment are addressed. Indeed, due to the fiscal neutrality policies in the Amendment, the County now has a financial tool that will make it easier to fund and provide water and wastewater facilities than it currently has under the Plan. Finally, to ensure that capital facilities are properly programmed and planned, the Amendment also contains Policy VOS2.2, which provides in pertinent part: To ensure efficient planning for public infrastructure, the County shall annually monitor the actual growth within Sarasota County, including development within the Village/Open Space RMA, and adopt any necessary amendments to APOXSEE in conjunction with the update of the Capital Improvements Program. It is beyond fair debate that the capital facilities provisions within the Amendment are supported by adequate data and analyses, and that they are otherwise in compliance. Financial feasibility and fiscal neutrality The Capital Improvement Element identifies facilities for which a local government has financial responsibility, and for which adopted levels of service are required, which include roads, water, sewer, drainage, parks, and solid waste. Manasota-88 and Compton challenge the "financial feasibility" of the Amendment. As noted above, there is significant data and analyses of existing and future public facility needs. The data collection and analyses were conducted in a professionally acceptable manner. The evidence shows that as part of its analyses, the County conducted a cost-benefit analysis of the Village development and determined that Village and Hamlet development can be fiscally neutral and financially feasible. Dr. Fishkind also opined that, based upon his review of the Amendment, it is financially feasible as required by the Act. Policy VOS2.9 of the Amendment provides in part: Each Village and each Hamlet development within the Village/Open Space RMA shall provide adequate infrastructure that meets or exceeds the levels of service standards adopted by the County and be Fiscally Neutral or fiscally beneficial to Sarasota County Government, the School Board, and residents outside that development. The intent of Fiscal Neutrality is that the costs of additional local government services and infrastructure that are built or provided for the Villages or Hamlets shall be funded by properties within the approved Villages and Hamlets. Policies VOS2.1, VOS2.4, and VOS2.9 provide that facility capacity and fiscal neutrality must be demonstrated, and that a Fiscal Neutrality Plan and Procedure for Monitoring Fiscal Neutrality must be approved at the time of the master plan and again for each phase of development. In addition, under Policy VOS2.9, an applicant's fiscal neutrality analysis and plan must be reviewed and approved by independent economic advisors retained by the County. Monitoring of fiscal neutrality is also provided for in Policy VOS2.2. Finally, Policy VOS2.10 identifies community development districts as the preferred financing technique for infrastructure needs associated with Villages and Hamlets. The evidence establishes beyond fair debate that the policies in the Amendment will result in a system of regulations that will ensure that fiscal neutrality will be accomplished. Internal inconsistencies Manasota-88 and Compton further contend that there are inconsistencies between certain policies of the Amendment and other provisions in the Plan. If the policies do not conflict with other provisions of the Plan, they are considered to be coordinated, related, and consistent. Conflict between the Amendment and the Plan is avoided by inclusion of the following language in Policy RMA1.3: If a property owner chooses to take advantage of the incentives provided by the Sarasota 2050 RMA, then to the extent that there may be a conflict between the Sarasota 2050 Resource Management Area Goal, Objectives and Policies and the other Goal[s], Objectives and Policies of APOXSEE, the Sarasota 2050 Resource Management Area Goal, Objectives and Policies shall take precedence. The other Goals, Objectives and Policies of APOXSEE including, but not limited to, those which relate to concurrency management and environmental protection shall continue to be effective after the adoption of these Resource Management Area Goal, Objectives and Policies. As to this Policy, Manasota-88's and Compton's claim is really nothing more than a preference that the Plan policies should also have been amended at the same time to expressly state that where there was a conflict between themselves and the new Amendment policies, the new Amendment would apply. Such a stylistic difference does not amount to the Amendment's not being in compliance. Therefore, it is fairly debatable that the Amendment is internally consistent with other Plan provisions. Public participation and intergovernmental coordination Petitioners next contend that there was inadequate public participation during the adoption of the Amendment as well as a lack of coordination with other governmental bodies. Ayech also asserted that there were inadequate procedures adopted by the County which resulted in less than full participation by the public. However, public participation is not a proper consideration in an in-compliance determination. In addition, the County has adopted all required procedures to ensure public participation in the amendment process. The County had numerous meetings with the municipalities in the County, the Council of Governments (of which the County is a member), and meetings and correspondence by and between the respective professional staffs of those local governments. The County also met with the Hospital Board and the School Board. The evidence is overwhelming that the County provided an adequate level of intergovernmental coordination. Regional and state comprehensive plans Petitioners have alleged violations of the state and regional policy plans. On this issue, Michael D. McDaniel, State Initiatives Administrator for the Department, established that the Amendment was not in inconsistent with the State Comprehensive Plan. His testimony was not impeached or refuted. Petitioners' claim that the Amendment is not consistent with the regional policy plan is based only on a report prepared by the Southwest Florida Regional Planning Council (SWFRPC) at the Amendment’s transmittal stage. There was no evidence (by SWFRPC representatives or others) that the report raised actual inconsistencies with the SWFRPC regional policy plan, nor was any evidence presented that the SWFRPC has found the amendment, as adopted, to be inconsistent with its regional plan. There was no persuasive evidence that the Amendment is either in conflict with, or fails to take action in the direction of realizing goals or policies in, either the state or regional policy plan. Other objections Finally, all other objections raised by Petitioners and not specifically discussed herein have been considered and found to be without merit. County's Request for Attorney's Fees and Sanctions On April 5, 2004, the County filed a Motion for Attorneys Fees and Sanctions Pursuant to F.S. § 120.595 (Motion). The Motion is directed primarily against Ayech and contends that her "claims and evidence were without foundation or relevance," and that her "participation in the proceeding was 'primarily to harass or cause unnecessary delay, or for frivolous purpose.'" The Motion also alleges that Manasota-88 and Compton "participated in this proceeding with an intent to harass and delay the Amendment from taking effect." Replies in opposition to the Motion were filed by Petitioners on April 12, 2004. The record shows that Ayech aligned herself (in terms of issues identified in the Pre-Hearing Stipulation) with Manasota-88 and Compton. While her evidentiary presentation was remarkably short (in contrast to the other Petitioners and the County), virtually all of the issues identified in the parties' Pre-Hearing Stipulation were addressed in some fashion or another by one of Petitioners' witnesses, or through Petitioners' cross-examination of opposing witnesses. Even though every issue has been resolved in favor of Respondents (and therefore found to be either fairly debatable or beyond fair debate), the undersigned cannot find from the record that the issues were so irrelevant or without some evidentiary foundation as to fall to the level of constituting frivolous claims. Accordingly, it is found that Petitioners did not participate in this proceeding for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Community Affairs enter a final order determining that the Sarasota County plan amendment adopted by Ordinance No. 2001-76 on July 10, 2002, is in compliance. DONE AND ENTERED this 14th day of May, 2004, in Tallahassee, Leon County, Florida. S DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of May, 2004.

Florida Laws (5) 120.569120.595163.3161163.3177163.3184
# 7
DEPARTMENT OF COMMUNITY AFFAIRS vs CITY OF PORT ST. LUCIE, 07-001568GM (2007)
Division of Administrative Hearings, Florida Filed:Port St. Lucie, Florida Apr. 05, 2007 Number: 07-001568GM Latest Update: Jul. 07, 2024
# 9
DEPARTMENT OF COMMUNITY AFFAIRS vs. CITY OF ISLANDIA, 89-001508GM (1989)
Division of Administrative Hearings, Florida Number: 89-001508GM Latest Update: Mar. 27, 1990

Findings Of Fact Based on the record evidence, the Hearing Officer makes the following Findings of Fact: The City of Islandia: General Description and Location The City of Islandia is a municipality situated within the jurisdictional boundaries of Dade County, Florida. It was incorporated in 1961. The City is located in an environmentally sensitive area in the southeastern corner of the county several miles east of the mainland. The City is separated from the mainland by Biscayne Bay and is accessible only by boat, seaplane, or helicopter. The City consists of 42,208 acres of submerged and non-submerged land, 41,366 acres of which are owned by the federal government and are part of Biscayne National Park. Biscayne National Park Biscayne National Park was established as a national monument in 1968. Twelve years later it was designated a national park. The park was established because of the unique natural resources within its boundaries. Its designation as a national park promotes the preservation and protection of these valuable resources. The park attracts visitors who engage in passive, marine-oriented recreational activities, such as fishing and snorkeling. Some development has taken place within the park. Among the structures currently standing are the buildings that house the park rangers who work and reside in the park and the docks that are used by those who travel to and from the park by boat. The City's Privately Held Land The remaining 842 acres of land in the City are owned by twelve private landowners, five of whom serve on the Islandia City Council. This land contains no infrastructure and is almost entirely undeveloped. As a result, it is in virtually pristine condition. Because the privately held land in the City is part of the same ecosystem as Biscayne National Park, the development of the privately held land will necessarily have an impact on the activities in the park. Of the 842 acres of privately held land in the City only approximately three acres consist of uplands. These uplands, at their highest elevation, are only four feet above sea level. The other 839 acres of privately held land are submerged bottom lands of Biscayne Bay and the Atlantic Ocean. The privately held land in the City is located in an area of coastal barrier islands known as the Ragged Keys. These islands lie between Biscayne Bay and the Atlantic Ocean. They are separated from one another by surge channels, through which the ocean waters enter the bay. Because of their location and low elevation, these islands are extremely vulnerable to the threat of storm surges and coastal flooding. It therefore is imperative that individuals on the islands evacuate to safety as soon as possible in advance of any storm or hurricane. 2/ The Coast Guard, which assists in the early evacuation of coastal residents, removes its assets from the water when wind speeds reach 35 miles per hour. This heightens the need for those on the islands to leave before the weather takes a turn for the worse. There are five Ragged Keys in private ownership. Ragged Key One, the northernmost of these islands, is surrounded by an old, breached bulkhead. Tidal waters enter where the bulkhead is breached. Coastal wetland vegetation is the only vegetation found on the island. Ragged Key Two is totally submerged and has no uplands. Mangroves are scattered throughout the island. Unlike Ragged Key Two, Ragged Key Three includes some uplands. Its shoreline, however, is fringed with white, red and black mangroves, vegetation associated with wetlands. Mangroves play a vital role in maintaining the health of the Biscayne Bay ecosystem. They contribute a leafy matter, known as detritus, to the nutrient budget of the bay. In addition, mangroves help filter upland runoff and protect against shoreline erosion. Most of Ragged Key Four is covered with mangroves. Red mangroves dominate, but there are also white and black mangroves. A narrow band of uplands, approximately 30 to 50 feet in width, runs through the center of the island. The island's upland vegetation consists of an unusual, and therefore ecologically significant, tropical hardwood hammock species not found on the mainland. Ragged Key Five, the southernmost of the privately owned Ragged Keys, is completely inundated by tidal waters twice a day. The vegetation on the northern one-half to two-thirds of the island consists almost exclusively of mangroves, with white mangroves dominating. Mangroves are also found on the island's southeastern perimeter. Less than an acre of uplands lies toward the center of the island. The dominant vegetation on these uplands is Australian pine. The privately held bottom lands in the City that are on the ocean side of the Ragged Keys consist of a number of species of hard coral as well as soft coral and sponges not found further to the north. Consequently, these hard- bottom communities are very significant ecologically. The privately held bottomlands in the City that are on the bay side of the Ragged Keys are covered almost entirely with seagrass beds. These seagrass beds are an essential component of the bay's ecosystem. They help to maintain water quality by stabilizing and filtering sediment and serve as habitat and food for fish and other marine organisms. This is significant from not only an environmental perspective, but from an economic perspective as well, inasmuch as commercial fishing is an important industry in the area. Seagrasses depend on light for their survival. If they are beneath, or otherwise shaded by, a structure, such as a "stilt home" or dock, or deprived of light as a result of construction-related turbidity, they will die. Water depths in the City on both the ocean and bay side of the Ragged Keys are extremely shallow. In most areas, the depth of the water never exceeds four feet. Consequently, one has to be a competent boater to navigate in these areas without running aground. Boats that travel in these shallow waters, even if piloted by competent navigators, are likely to scrape and scar the ocean and bay bottom and damage the seagrass and hard-bottom communities that exist there. Furthermore, these boats are likely to leave behind in the waters they have traversed bilge waters, oils, greases and metallic-based paints from their undersides. This has the effect of lowering water quality. Fortunately, boating activities in these waters have been limited to date and, consequently, these activities have resulted in only minor environmental damage. Substantial damage will occur, however, if boat traffic on these waters increases significantly. Comprehensive Plan Preparation and Adoption The City's comprehensive plan was drafted by the staff of Robert K. Swarthout, Inc., a consulting firm that specializes in land use planning. Before retaining the services of the Swarthout firm, the City's governing body, the City Council, voted that, in the plan, all of the privately held land in the City would be designated for "residential" use and that the allowable density would be six units per acre. Sound planning dictates that such decisions be made only after the character of the land and its suitability for development are analyzed. A proposed plan for the City was developed by the Swarthout firm. Following a vote of the City Council, the proposed plan was transmitted to DCA. Upon its receipt of the proposed plan, DCA distributed copies to other governmental agencies, including Dade County, and solicited their comments. After receiving these comments and conducting its own review, DCA sent to the City a report containing DCA's objections, recommendations and comments regarding the City's proposed plan. In response to this report, the Swarthout firm drafted certain modifications to the proposed plan. The proposed plan, as so modified, was adopted by the City Council on January 13, 1989, and thereupon transmitted to DCA. The City Council held public hearings before transmitting the proposed plan and the adopted plan to DCA. The twelve private landowners in the City were notified of these hearings by mail. No one else, including any park ranger residing in the City or any other representative of the federal government, was given direct, individual advance notice of these hearings, nor were the hearings advertised in any newspaper or other publication. In failing to provide advance notice of these hearings to any one other than the City's twelve private landowners, the City Council relied upon the opinion of its attorney that no additional notice was necessary to meet the requirements of the law. Format of the City's Adopted Plan The City's adopted plan focuses upon the 842 acres of privately held land in the City. It does not discuss in great detail the future of Biscayne National Park, which comprises more than 98% of the City's land area. The plan consists of nine elements: future land use; transportation; housing; infrastructure; coastal management; conservation; recreation and open space; intergovernmental; and capital improvements. Each element contains goals, policies and objectives. In addition, the future land use element includes a future land use map and the capital improvements element includes both an implementation section and a section prescribing monitoring, updating and evaluation procedures. The document containing the City's adopted plan also describes and discusses the data and analysis upon which the plan is purportedly based. According to the document, however: Only the following segments of this document were adopted by the City Council: Goals, Objectives and Policies Capital Improvements Element Implementation section Future Land Use map Monitoring, Updating and Evaluation Procedures Future Land Use Element The future land use element of the City's adopted plan sets forth the following goals, objectives and policies: Goal 1 To provide for minimal residential development compatible with the natural resources of the National Park and balance of the islands. Objective 1.1 By 1994, achieve first phase new development sited appropriately for the topographic/flood conditions and infrastructure compatible with soil conditions. Policy 1.1.1 As the residential development occurs, require acceptable private paths, drainage, water and sewer systems through the development code; special care is needed due to limited wellfield and soil absorption areas. Policy 1.1.2 Private automobiles shall not be permitted; adequate boat or aircraft access facilities shall be required by the development code. Policy 1.1.3 Development permits shall be issued only if facilities meeting the following levels of service can be made available concurrent with the impacts of development: -Sewage disposal: septic tanks 3/ or package treatment plants providing a treatment capacity of 300 gallons per residential unit per day -Water: wells providing 300 gallons per residential unit per day -Drainage: on-site retention and drainage systems that can accommodate a one-day storm that occurs once in ten years (statistically) -Solid waste: off-island disposal by individual homeowners or other property owners 4/ -Circulation: pedestrian and golf cart paths -Open space: public and private of 175 acres per permanent resident Objective 1.2 Ensure reasonable protection of historic and natural resources (particularly) mangroves as development occurs. See policy for measurability Policy 1.2.1 Within one year of transmitting this plan, a development code will be prepared to assure adequate protection of the vegetative communities (particularly mangroves) as well as sensitive to hurricane considerations and the bay bottom ecology. Policy 1.2.2 The City shall consult with the National Park Service should any archaeological sites be found on the privately owned islands. Policy 1.3 Facilitate planned unit development projects through the 1989 adoption of a development code. Policy 1.3.1 Within one year of transmitting this plan, include Planned Unit Development provisions in the zoning provisions of a development code to help achieve residential development. Objective 1.4 By July 1989, adopt a development code to implement land use policies that correspond to the category on the Future Land Use Plan and minimize hurricane evacuation. Policy 1.4.1 The following land use densities, intensities and approaches shall be incorporated in the land development code; development will be required to use these densities in a mixed use Planned Unit Development format -Residential: Single-family detached and attached units at a density of 6 units per acre or less in a PUD mixed-use format. -Commercial: Supporting boat clubs/marinas, restaurants and light convenience retail; this would either be in the residential PUD or the National Park Recreation category i.e. not shown on the map. -Recreation and Open Space: This category includes primarily the National Park. The future land use map depicts only two future land uses: "recreational," which is described on the map as constituting lands of the "National Park and City Park;" and "residential," which is indicated on the map as constituting "[l]ess than 6 units per acre in Planned Unit Developments with supporting service commercial." Because Policy 1.4.1 of the future land use element permits a maximum "residential" density in the City of "6 units per acre" whereas the future land use map reflects that the City's maximum permissible "residential" density is "less [emphasis supplied] than 6 units per acre," these two provisions of the City's adopted plan are inconsistent. On the future land use map, only Ragged Keys One through Five are designated for "residential" use. The remaining land in the City, including the privately held bay and ocean bottom surrounding these islands, is designated on the map for "recreational" use. There are statements in the plan document that reflect that "residential" development is contemplated not just for the five Ragged Keys, but for the entire 842 acres of privately held land in the City. Such statements include the following which are found in the discussion of the data and analysis allegedly underlying the future land use element: Residential Capacity- The islands under municipal jurisdiction have not been developed, and there are only 842 acres of suitable vacant land for the development of residential units. Based on the Land Use Plan PUD density of six units per acre, this would suggest a build-out of 5,000 housing units. * * * Needs Assessment: Not Applicable and Other Issues- There are no incompatible or blighted uses. Some private redevelopment might be involved in upgrading the boat dock and several recreational housing units. Rather than an analysis of the land required to accommodate the projected population, this is a case where the 842 acres of buildable private land can accommodate a build-out population of about 5,000 although 720 is projected for the year 2000 based upon a projected private market demand for development at five units per acre requiring 78 acres. * * * Future Land Use Plan: Land Use Category- As indicated above, all non-Park Service land and bay bottom (842 acres) is designated "Residential Planned Unit Development With Supporting Commercial;" this will accommodate the projected population. * * * Future Land Use Plan: Impact- It is important to note the minimal impact that the private development area (842 acres), will have on the total area of the City which encompasses 42,208 acres. * * * Future Land Use Plan: Density- Approximately 842 acres, at a density of less than six units per acre, are proposed for development of the recreational units. These statements, however, are not included in those portions of the plan document that were adopted by the City Council and therefore are not part of the City's adopted plan. In addition to depicting future land uses, the future land use map also shows shoreline areas. Beaches, wetlands, and flood plains, however, are not identified on the map. Transportation Element The transportation element of the City's adopted plan contains the following goals, objectives and policies: Goal 1- To meet the unique circulation needs of Islandia. Objective 1.1- As development occurs, achieve an internal circulation system that uses paths for pedestrians, bicycles and golf carts but not automobiles. Policy 1.1.1- By July 1989, enact a development code that requires developers to provide such a path system, a) concurrent with development, and b) that connects with other adjacent developments and the boat dock facilities. Policy 1.1.2- Include development code provisions that require adequate access to the development from the mainland i.e. either by boat or aircraft facilities. Housing Element The following goals, objectives and policies are set forth in the housing element of the City's adopted plan: Goal 1- To provide recreational housing units compatible with the unique locational and environmental character of Islandia. Objective 1.1- Achieve and maintain quality housing with supporting infrastructure. Policy 1.1.1- By July 1989, enact a development code that provides an expeditious review process yet assures concurrent adequate private infrastructure. Policy 1.1.2- Include building and property maintenance standards that will assure that units are maintained in sound condition. Policy 1.1.3- To assure environmentally sound design, City codes shall include building standards (sensitive to hurricanes) and site plan review. Infrastructure Element As evidenced by the following goals, objectives and policies set forth in the infrastructure element of the City's adopted plan, the City intends that infrastructure needs will be met by private developers, rather than by the City through the expenditure of public funds: Goal 1- To provide adequate private infrastructure to serve the projected limited recreational residential development. Objective 1.1- Assure provision of adequate, environmentally sensitive private infrastructure concurrent with development through a 1989 development code. Policy 1.1.1- By July 1989, enact a development code that requires City site plan review with engineering design standards in the areas of water supply, sewage disposal, drainage, solid waste, groundwater recharge and wellfield protection plus incentives for the use of solar energy and solid waste recycling (to reduce disposal quantities by 30 percent). Policy 1.1.2- Require all development to meet the following level of service standards: -Sewage disposal: package treatment plants providing treatment capacity of 300 gallons per residential unit per day 5/ -Water: wells providing 300 gallons per residential unit per day -Drainage: on-site retention and drainage systems that can accommodate a one-day storm that occurs once in ten years (statistically) -Solid waste: off-island disposal by individual homeowners or other property owners. Objective 1.2- Encourage multi-unit water and sewer systems in order to protect the fragile environment through the 1989 development code. Policy 1.2.1- Include planned unit development provisions in the development code to be enacted by July 1989 thereby encouraging joint systems rather than individual wells and septic tanks. 6/ Policy 1,3- Protect wellfield aquifer recharge areas from development. Policy 1.3.1- By 1991, enact development code provisions that require developers to designate their wellfield aquifer recharge areas, and authorize the City to then prohibit development within said areas and related drainage systems. Objective 1.4- Each developer shall provide a mechanism for water conservation. Policy 1.4.1- At the time building permits are issued for the first development, the City and developer shall jointly prepare a water conservation plan for normal and emergency consumption. Coastal Management Element The City's adopted plan contains the following goals, objectives and policies relating to coastal management: Goal 1- To conserve, manage and sensitively use the environmental assets of Islandia's coastal zone location. Objective 1.1- Through the 1989 development code adoption, continue to protect the barrier island function and wildlife habitat. Policy 1.1.1- Retain the integrity of the islands by strictly regulating shoreline dredge and fill through the development code. Policy 1.1.2- Require common open space in conjunction with private development to retain wildlife habitats, wetlands and mangroves and assist in preservation of marine water quality and living resources. Objective 1.2- Through the 1989 development code adoption, include estuarine protection policies and thus assure environmental quality. Policy 1.2.1- The development code shall result in drainage, sewage disposal and shoreline setback policies that protect the estuary. Policy 1.2.2- As private development occurs, the City shall use the County's Biscayne Bay Aquatic Preserve Management Plan as a basis for review and maintain liaison with the Biscayne Bay Management Committee's staff. This will also be the vehicle for coordinating with the City of Miami (which is some 10 miles to the north) in terms of estuarine. Objective 1.3- Continue the current pattern which is all uses, including shoreline uses, are water dependent. Policy 1.3.1- Use the development code to maintain a shoreline use pattern that is either park, natural private land or residential with supporting boat facilities; by definition, all Islandia uses are water dependent. Objective 1.4- Protect the current natural beach and dune configuration. Policy 1.4.1- Through the development code, require any private development to a) setback far enough from the beach to retain the dunes and b) retain the related vegetative cover and wetlands or mitigate on a fair value ratio. Goal 2- To minimize hurricane damage both to property and people. Objective 2.1- Continue the current City policy of not providing infrastructure unless public safety or natural resource preservation so requires. Policy 2.1.1- The City shall not program any municipal infrastructure; private development will provide its own circulation, water and sewer systems. Objective 2.2- Residential development will be limited in amount and density, and setback from the shoreline due to the coastal high hazard area location. Policy 2.2.1- Maintain density controls so that the City will experience only limited new residential development and thereby not jeopardize hurricane evacuation capabilities or undue concentration on the private islands which are the high hazard area. (Analysis explains why directing population away from the coastal high hazard area is not feasible.) 7/ Objective 2.3- By July 1989, adopt development code provisions that assure adequate boat evacuation capability by developers and occupants. Policy 2.3.1- The development code shall require, as a condition of development permit approval, an evacuation plan showing adequate boat or aircraft capability. Objective 2.4- By 1993, prepare an emergency redevelopment plan. Policy 2.4.1- By 1993, the first phase of residential development should be underway; that will permit preparation of a realistic post-disaster redevelopment plan. Currently there is little to "redevelop." Objective 2.5- Preserve both resident and general public access to the beach. Policy 2.5.1- Over 98 percent of Islandia's area is public land with shoreline access. However, the remaining two percent should be developed so as to maximize resident beach access through planned unit development requirements. 8/ Objective 2.6- The City's objective is not to provide any public infrastructure; private developers shall provide infrastructure in conformance with level of service standards, concurrent with development. Policy 2.6.1- Developers shall provide infrastructure, with a design sensitive to hurricane vulnerability, concurrent with the impact of development within a development code concurrency management system and in keeping with the following levels of service: -Sewage Disposal: package treatment plants providing treatment capacity of 300 gallons per residential unit per day. 9/ -Water: wells providing 300 gallons per residential unit per day. -Drainage: on-site retention and drainage systems that can accommodate a one-day storm that occurs once in ten years (statistically). -Solid Waste: off-island disposal by individual homeowners or other property owners. Conservation Element The following goals, objectives and policies are found in the conservation element of the City's adopted plan: Goal 1- To preserve and enhance the significant natural features of Islandia. Objective 1.1- Continue policies that help achieve compliance with State Department of Environmental Affairs [sic] air quality regulations; see policy for measurability. Policy 1.1.1- Continue to prohibit automobiles in the City. Objective 1.2- By July 1989, require drainage practices that avoid direct development runoff into the ocean or bay. Policy 1.2.1- By July 1989, enact development code provisions that require on-site runoff detention. Objective 1.3- By July 1989, achieve protection of existing vegetation and wildlife communities. Policy 1.3.1- By July 1989, enact development code provisions that require retention of a percentage 10/ of prime vegetative cover and wildlife habitat; particularly mangroves. Policy 1.3.2- These development regulations shall also address preservation/mitigation of the scattered island wetlands and related soils. Policy 1.3.3- Work with Federal park officials to assure that any National Park improvements are sensitive to the mangrove and other environmentally sensitive vegetative/wildlife/ marine habitats. Objective 1.4- By July 1989, have basis to avoid development activities that adversely impact the marine habitat. Policy 1.4.1- By July 1989, enact development code provisions that control dredge and fill activities, and boat anchorages in order to protect the marine and estuarine character, including the fish feeding areas on the Biscayne Bay side of the islands; special care must be taken to avoid any disruption of the tidal channels between the islands. Objective 1.5- When development occurs, achieve carefully located and designed well and sewage disposal systems. Policy 1.5.1- By July 1989, enact development code provisions that require City technical review of all well and sewage disposal systems to assure well water protections, groundwater conservation and sewage effluent control. Policy 1.5.2- When the first phase residential development permits are issued, develop an emergency water conservation program. This element of the City's adopted plan does not contain a land use and inventory map showing wildlife habitat and vegetative communities. Recreation and Open Space Element The recreation and open space element of the City's adopted plan prescribes the following goals, objectives and policies: Goal 1- To provide recreation facilities and open space which are responsive to the leisure-time needs of residents. Objective 1.1- By July 1989, achieve controls that achieve common access to the bay and the ocean. Policy 1.1.1- The City shall enact development code provisions that protect common access to the shoreline as development occurs. Objective 1.2- By July 1989, assure private recreational resources in the limited development projects to complement the National Park. Objective 1.2.1- The City shall enact development code provisions that require private recreational facilities for developments over a certain size, to complement the public National Park. Policy 1.3.1- The City shall urge Congress to retain the National Park thereby providing a Level of Service of at least 57 acres of public open space per permanent resident prior to the year 2000. 11/ Objective 1.4- Ensure the preservation of public and private open space. Policy 1.4.1- By July 1989, enact development code regulations to assure preservation of adequate private open space in conjunction with private development. Policy 1.4.2.- Work with Congress and National Park Service to assure preservation of this public open space resource. Policy 1.4.3- The City shall retain City Key in its ownership for potential use as a municipal park. Intergovernmental Element The following goals, objectives and policies in the City's adopted plan address the matter of intergovernmental coordination: Goal 1 - To maintain or establish processes to assure coordination with other governmental entities where necessary to implement this plan. Objective 1.1- By 1994, at least three of the seven issues listed in the Analysis shall be the subject of formal agreement, assuming development review has been initiated. Policy 1.1.1- The Mayor shall oversee the implementation of the recommendations outlined in the Analysis section of this element. Policy 1.1.2- In particular, the Mayor shall work with County Office of Emergency Management relative to hurricane warning and evacuation mechanisms. Policy 1.1.3- The City shall continue to work with the County and Regional planning agencies in an attempt to reach consensus on a mutually agreeable land use designation for the private islands. Policy 1.1.4- If necessary, the City shall use the South Florida Regional Planning Council to assist in the mediation of any major intergovernmental conflicts; the County land use plan is a potential example. Policy 1.1.5- After development is initiated, the Mayor shall annually issue a report outlining the services the City is providing and providing information on intergovernmental coordination. Policy 1.1.6- The City shall review all development applications in the context of the Biscayne Bay Aquatic Management Plan and maintain liaison with the staff to the Committee responsible for this plan. Objective 1.2- The Mayor shall meet at least annually with the National Park Superintendent to coordinate the impact of the City's development upon adjacent areas. Policy 1.2.1- City officials shall maintain liaison with the National Park Service on any land use or development impacts along their common boundaries. Objective 1.3- By 1999, assure level of service standards coordination with the County relative to solid waste. Policy 1.3.1- As first phase development is completed, City officials shall work with County officials on the long range implications of solid waste disposal to determine adequacy and approach. The "seven issues listed in the [intergovernmental] Analysis" section of the plan document (reference to which is made in Objective 1.1) concern the following subjects: land uses and densities; historic resources; private holdings within the National Park; permitting for construction and related infrastructure; solid waste; Biscayne Bay water quality; and emergency evacuation. The "land uses and densities" issue raised in the Intergovernmental Analysis section of the plan document relates to the alleged inconsistency between the City's plan and Dade County's plan regarding the land use designation of the privately held land in the City. It is asserted in this section of the document that the "Metro-Dade Comprehensive Plan shows the privately owned land in Islandia as 'Parks and Recreation' rather than residential." The following recommendation to resolve this alleged conflict is then offered: To date, the coordination on this issue has been sporadic. 12/ If neither the County nor National Park Service are willing to acquire these islands at a fair price, then the County plan should be amended to show them as residential. The Regional Planning Council can serve as a mediator. Dade County's adopted plan provides the following explanation of the significance of a "Parks and Recreation" land use designation in terms of the development potential of the land so designated: Both governmentally and privately owned lands are included in areas designated for Parks and Recreation use. Most of the designated Privately owned land either possess outstanding environmental qualities and unique potential for public recreation, or is a golf course included within a large scale development. The long term use of such golf courses is typically limited by deed restriction. If the owners of privately owned land designated as Parks and Recreation choose to develop before the land can be acquired for public use, the land may be developed for a use, or at a density comparable to, and compatible with surrounding development providing that such development is consistent with the goals, objectives, policies of the CDMP (the County's plan). This allowance does not apply to land designated Parks and Recreation that was set aside for park or open space use as a part of, or as a basis for approving the density of, a residential development. Certain commercial activities that are supportive of the recreational uses and complementary to the resources of the park, such as marine supply stores, fuel docks or tennis and golf clubhouses may be considered for approval in the Parks and Recreation category. Other commercial recreational or entertainment, or cultural uses may also be considered for approval in the Parks and Recreation category where complementary to the site and its resources. Some of the land shown for Parks is also environmentally sensitive. These areas include tropical hardwood hammocks, high- quality Dade County pineland, and viable mangrove forests. Some sites proposed for public acquisition under Florida's Conservation and Recreational Lands (CARL) program are identified in this category on the LUP (Land Use Plan) map although they may be as small as ten acres in size. Many of these areas are designated on the LUP map as "Environmentally Protected Parks" however, some environmentally sensitive areas may be designated simply as Parks and Recreation due to graphic restraints. All portions of parkland designated Environmentally Protected Parks or other parkland which is characterized by valuable environmental resources is intended to be managed in a manner consistent with the goals, objectives, and policies for development of the applicable environmental resources or protection area. Because it is an environmentally sensitive area, the City of Islandia, including the five Ragged Keys, has been designated "Environmentally Protected" parkland on the County's future land use map. Under the County's plan, the maximum density permitted on land so designated is one unit per five acres. With respect to the issue of historic resources, it is stated in the Intergovernmental Analysis section of the document containing the City's plan that the preservation of such resources within Biscayne National Park is the responsibility of the "National Park Service working with the State Bureau of Historic Preservation (within the Department of State) and the County Historic Preservation Division." Regarding the matter of private holdings within Biscayne National Park, the assertion is made in the Intergovernmental Analysis section of the plan document that "[a]lthough existing formal agreements exist relative to individual life estates and long-term leases by private owners within the Park, there is a need for a formal agreement relative to joint development review and agreements between the National Park Service and the City." As to permitting requirements, the Intergovernmental Analysis section of the plan document acknowledges "the array of permits required [from federal, state and county agencies] for private development and related infrastructure" in the City. In view of the regulatory authority of these agencies, the recommendation is made that the "City development code should establish a systematic review process flow chart meshing with the concurrency management system." Concerning the issue of solid waste, it is suggested in the Intergovernmental Analysis section of the plan document that "once first phase development is completed, the off-island disposal of solid waste by residents should be monitored for effectiveness" and if "this system is not working, a City-County collection arrangement would have to be developed." With respect to the issue of the water quality of Biscayne Bay, it is noted in the Intergovernmental Analysis section of the plan document that the County's "Biscayne Bay Aquatic Preserve Management Plan (Biscayne Bay Management Plan) can serve as a guide to intergovernmental estuary planning and protection as development occurs" and that therefore the "City should consult with the [County's Biscayne Bay Management Committee] staff when development proposals reach preliminary status." 13/ The Biscayne Bay Management Plan is codified in Chapter 33-D of the Metro-Dade County Code. It identifies guidelines and objectives designed to optimize the quality and quantity of marine life in the bay, to protect the bay's endangered and rare plants and animals, and to avoid irreversible and irretrievable loss of the bay's resources. The following are among the guidelines set forth in the plan: Coastal construction should be compatible with the Bay's natural features. . . * * * 8. Siting of new marinas and docking facilities should avoid use of shoreline areas containing viable submerged communities and near-shore areas of inadequate navigational depths. Such facilities should not negatively impact existing water quality. * * * The total impact from the many individual development or user activities along the Bay shoreline should not be allowed to negatively affect the Bay's biological, chemical or aesthetic qualities. Facilities in and over Bay waters and its tributaries should only be constructed if their development and use are water- dependent. Concerning the issue of emergency evacuation, the observation is made in the Intergovernmental Analysis section of the document that the "City's hurricane vulnerability makes an effective early warning imperative." It is therefore recommended that "[w]hen development occurs, the City should formalize an arrangement with the County 14/ including formal contacts, evacuation route/shelter designations and boat monitoring mechanism." 15/ Capital Improvements Element The capital improvements element of the City's adopted plan establishes the following goals, objectives and policies: Goal 1- To undertake municipal capital improvements when necessary to complement private new development facilities, within sound fiscal practices. Objective 1.1- The Mayor shall annually monitor public facility needs as a basis for recommendations to the City Council. Policy 1.1.1.- Engineering studies shall form the basis for annual preparation of a five- year capital improvement program, including one year capital budget if and when such municipal projects are deemed necessary. This element shall be reviewed annually. Policy 1.1.2- Overall priority for fiscal planning shall be those projects that enhance residential development and the environment, as per Land Use Plan. Policy 1.1.3- In setting priorities, the following kinds of criteria will be used: -Public Safety implications: a project to address a threat to public safety will receive first priority. -Level of service or capacity problems: next in priority would be projects needed to maintain the stated Level of Service. -Ability to finance: A third criteria is the budgetary impact; will it exceed budget projections? -Quality of life projects: lowest priority would be those projects not in categories 1 or 2 but that would enhance the quality of life. -Priority will be given to projects on islands experiencing development. Policy 1.1.4- Pursue a prudent policy in terms of borrowing for major capital improvements; in no case borrow more than two percent of the total assessed value in any one bond issue or loan. Objective 1.2- By July 1989, the City shall adopt a development code containing a concurrency management system to integrate the land use plan, capital improvement element and levels of service. Policy 1.2.1- City officials shall use both the Future Land Use Plan and financial analyses of the kind contained herein as a basis for reviewing development applications, in order to maintain an adequate level of service; all except parks are expected to be private: -Sewage disposal: septic tanks or package treatment plants providing treatment capacity of 300 gallons per residential unit per day 16/ -Water: wells providing 300 gallons per residential unit per day -Drainage: on-site retention and drainage systems that can accommodate a one-day storm that occurs once in ten years (statistically) -Solid Waste: off-island disposal by individual homeowners or other property owners -Public open space: 57 acres per permanent resident Objective 1.3- Major future development projects shall pay their fair share of the capital improvement needs they generate. Policy 1.3.1- The proposed development code and related review process shall require on-site detention and drainage structures acceptable to regional environmental agencies plus private water and sewer systems. Policy 1.3.2- The development code preparation shall include the consideration of impact fees. Policy 1.3.3- Pedestrian paths shall be installed as a part of all new development. Objective 1.4- Achieve mechanisms whereby public and private facility requirements generated by new development are adequately funded in a timely manner. Policy 1.4.1- The development code shall specify that no development permit shall be issued unless assurance is given that the private (or possibly public) facilities necessitated by the project (in order to meet level of service standards) will be in place concurrent with the impacts of the development. The capital improvements element of the City's adopted plan also contains an Implementation section which provides as follows: Five-Year Schedule of Capital Improvements Not applicable; no deficiencies and no projects planned for 1990-1994 period. Programs For purposes of monitoring and evaluation, the principal programs needed to implement this Element are as follows: Initiate an annual capital programming and budgeting process as soon as warranted by prospective projects; use project selection criteria. Use engineering or design studies to pinpoint the cost and timing of any potential needs or deficiencies as they are determined. Amendments to the development code to a) assure conformance to the "concurrency" requirements relative to development orders, levels of service and public facility timing, and b) explore selected impact fees e.g. for park, boat dock and beach renourishment. Data and Analysis If a comprehensive plan is to be an effective tool in managing a community's future growth and development, it must be based, not upon unsubstantiated assumptions or wishful thinking, but rather upon appropriate data and reasoned analysis of that data. Typically, the first step in developing a comprehensive plan is to ascertain the projected population of the community. Once such a projection is made, the amount of land needed to accommodate the projected population must then be determined. The analysis does not end there, however. Before any decision is made regarding how, and to what extent, the community's land will be used in the future to meet the needs of the projected population, the character of the land, including its soils, topography, and natural and historic resources, must be examined so that its suitability for development can be determined. Only after such a suitability determination is made and the carrying capacity of the land is evaluated is it appropriate to assign land use designations and densities. The City Council did not follow this conventional approach in developing its comprehensive plan. Instead, it used a methodology that is fundamentally flawed and not professionally accepted. Without collecting and analyzing available information concerning the amount of land needed to accommodate the City's future population and the character and suitability of the City's land to meet the needs of the population, it arbitrarily determined at the outset of the planning process that the privately held land in the City would be designated for "residential" use and that a maximum density of six units per acre would be allowed. It appears that the City Council simply assumed, based on nothing more than the fact that the land was in private ownership, that it was suitable for residential development at six units per acre. Had the City Council examined the information that was readily available to it concerning the character of the privately held land in the City, it undoubtedly would have realized that such land is actually unsuitable for such intense residential development. The City Council, through its consultant, the Swarthout firm, subsequently, but prior to the January 13, 1989, adoption of the City's plan, projected the population of the City and the amount of land needed to accommodate the anticipated population. It estimated that the City's population would be about 300 in 1994 and approximately 720 in the year 2000 and that 78 acres of land would be needed to accommodate the projected population in the latter year. These projections, however, were not made pursuant to a professionally accepted methodology inasmuch as they were based, at least in part, upon the preconceived notion that the City's plan should permit residential development of the privately owned land in the City at a density of six units per acre. In making these projections, the City Council assumed that all of the 842 acres of privately held land in the City would be subject to residential development. The future land use map adopted by the City Council, however, designates only a small portion of that land, the approximately 12 acres comprising the five Ragged Keys, for residential use. This is considerably less land than that the City Council projected would be needed to accommodate the City's population in the year 2000. The final land use decisions reflected on the future land use map were not the product of a thoughtful and reasoned analysis of issues that should have been considered before such decisions were made. The City Council failed to adequately consider and analyze, among other things, the following significant matters before making these decisions and adopting the City's comprehensive plan: the character of the five Ragged Keys and their suitability for residential development at a density of six units per acre, particularly in light of their location in a flood prone area; the adverse impact that such development, including related housing and infrastructure construction activities, would have on the area's natural resources and fragile environment; 17/ whether the potable water 18/ and sanitary sewer needs generated by such development can be met given logistical and environmental constraints; 19/ the financial feasibility of, and problems associated with, siting infrastructure on the land to be developed; 20/ whether the future residents of the City can be safely evacuated from the City in the face of a hurricane or tropical storm given the City's location in a coastal high-hazard area accessible from the mainland only by water and air; 21/ and the need for boat docking and other water-dependent facilities. The City's adopted plan therefore is not supported by appropriate data and analysis. The Regional Plan for South Florida The South Florida Regional Planning Council has adopted a Comprehensive Regional Policy Plan (Regional Plan) to guide future development in Broward, Dade and Monroe Counties. The Regional Plan addresses issues of regional significance. Goal 51.1 of the Regional Plan provides as follows: By 1995 the amount of solid waste placed in landfills will be reduced by 30 percent over the 1986 volume. A local government's comprehensive plan must establish a level of service for solid waste disposal if it is to be consistent with, and further, this goal of the Regional Plan. The City's comprehensive plan does not do so. Goal 57.1 of the Regional Plan states as follows: New development will not be permitted in areas where public facilities do not already exist, are not programmed, or cannot be economically provided. The City's comprehensive plan contemplates new development in areas where there are no existing nor planned public facilities. Although the plan suggests that infrastructure will be provided by private developers, there is no indication that any consideration was given to the costliness of such a venture. Goal 58.1 of the Regional Plan imposes the following requirement: Beginning in 1987, all land use plans and development regulations shall consider the compatibility of adjacent land uses, and the impacts of development on the surrounding environment. The State Comprehensive Plan The State of Florida also has a comprehensive plan. The State Comprehensive Plan confronts issues of statewide importance. Among other things, it requires "local governments, in cooperation with regional and state agencies, to prepare advance plans for the safe evacuation of coastal residents [and] to adopt plans and policies to protect public and private property and human lives from the effects of natural disasters." It also reflects that it is the policy of the State to "[p]rotect coastal resources, marine resources, and dune systems from the adverse effects of development" and to "[e]ncourage land and water uses which are compatible with the protection of sensitive coastal resources." Dade County Dade County is a political subdivision of the State of Florida. It has regulatory authority over the tidal waters, submerged bay bottom and coastal wetlands in the City of Islandia. It also has the authority under its Home Rule Charter to prescribe appropriate land uses and planning principles for the entire area within its territorial boundaries. Dade County municipalities, however, are free to deviate from the County's plan in fashioning a comprehensive plan of their own. If the residential development permitted by the City's adopted plan occurs, it will have a substantial adverse impact on areas within Dade County's jurisdiction, including Biscayne Bay, which have been designated as areas warranting protection and special treatment. Tropical Audobon Society The Tropical Audobon Society is a not-for-profit Florida corporation which engages in educational, scientific, investigative, literary and historical pursuits relating to wild birds and other animals and the plant, soil, water and other conditions essential to their development and preservation. On occasion, Tropical and its members engage in activity in the City of Islandia. They participate from time to time in census surveys of the City's bird population. In addition, they conduct tours through the City for people who want to observe the area's wildlife. The overwhelming majority of Tropical members are South Floridians. None of its members, however, reside or own land in the City of Islandia. Neither Tropical, nor anyone acting on its behalf, submitted oral or written objections during the City Council proceedings that culminated in the adoption of the City's comprehensive plan.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED the Administration Commission issue a final order which: (1) dismisses the Tropical Audobon Society's petition to intervene; (2) finds the City of Islandia's adopted comprehensive plan not "in compliance," within the meaning of Section 163.3184(1)(b), Florida Statutes, for the reasons set forth in the foregoing Conclusions of Law; (3) directs the City to remedy these specific deficiencies to bring the plan "in compliance;" and (4) imposes appropriate sanctions authorized by Section 163.3184(11), Florida Statutes. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 27th day of March, 1990. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of March, 1990.

Florida Laws (20) 120.57120.68161.053161.091163.3161163.3164163.3177163.3178163.3181163.3184163.3187163.3191186.008186.508187.101200.065206.60210.20218.61380.24 Florida Administrative Code (5) 9J-5.0039J-5.0059J-5.0069J-5.0119J-5.012