Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
WINKO-MATIC SIGNAL COMPANY vs. DEPARTMENT OF TRANSPORTATION, 84-002250 (1984)
Division of Administrative Hearings, Florida Number: 84-002250 Latest Update: Jan. 18, 1985

Findings Of Fact On March 1, 1984, Respondent gave notice to qualified contractors that it would receive sealed bids for State Project No. 72000-3541, referred to as Federal-Aid Project No. M 9041(10). This project involves the installation of a computerized traffic control system for the City of Jacksonville. In response to the opportunity to bid, the Department of Transportation received four bids. Petitioner, Winko-Matic Signal Company, was among the bidders. The other bidders were Georgia Electric Company, Traffic Control Devices, Inc., and Sperry Systems Management. The bids of Traffic Control Devices and Sperry Systems were rejected based upon an error in bid tabulations on the part of Traffic Control, a mistake on the quantities page, with the Sperry rejection being based upon a bid bond problem. Traffic Control had been the apparent low bidder with a bid of $1,964,115. Winko-Matic was the second apparent low bidder with a bid of $2,279,604.70. The Department of Transportation had estimated that the total cost of the Jacksonville project would be $ 2,024,680.61. Having discarded the bid of Traffic Control Devices, the Department of Transportation telegrammed Winko-Matic on April 4, 1984, advising Winko-Matic that it was the apparent low bidder for the Jacksonville project. Subsequently, the awards committee of the Department of Transportation met on April 18, 1984, and determined to reject all bids and re-advertise the job. In the course of this meeting the awards committee was told that there were erratic bids received on contract items, pointing to some perceived confusion among the contractors as to requirements of the contract. Discussion was also held on the possibility of establishing a pre-bid conference if the project was re advertised. The awards committee then voted to reject the bids on the basis that the apparent low bidder, Winko-Matic, had submitted a bid which-was 12.6 percent over the Department's estimate, instead of being within 7 percent of the Department of Transportation's pre-bid estimate, a point above which the Department of Transportation in its non-rule policy would call to question to the acceptability of the apparent low bid. In addition to deciding to reject all bids and re-advertise, it was determined that a pre-bid conference should be scheduled at least 30 days prior to the bid-letting date. Winko-Matic was advised that the Department of Transportation's decision to reject all bids by correspondence of May 4, 1984, in which it was indicated that all bids had been rejected based upon the fact that they were too high. In response to this notice of rejection, Winko-Matic, effective May 17, 1984, filed a written notice of protest. The case was subsequently referred to the Division of Administrative Hearings on June 20, 1984, and a final hearing date was established by Notice of Hearing of July 5, 1984. The hearing date in this cause was September 12, 1984. The Jacksonville project in question requires the utilization of what has been referred to "UTCS Enhanced" software. This software package is unique and has only been used in a limited number of locations within the country. Those locations are Los Angeles, California; San Diego, California; Broward County, Florida; and Birmingham, Alabama. Another unique feature within the project design is the use of an associated coaxial computer sys gem. Given the unique nature of this project and the fact that the Department of Transportation had never advertised for bids related to UTCS software, Department of Transportation obtained assistance from a consulting firm, Harland, Bartholomew & Associates. In fulfilling its function Harland gave estimates to include an estimate related to the projected cost of the software, Item 681-102. The Harland estimate for the overall project was $2,143,130 including a $100,000 estimate for the software system. That estimate relating to the software was subsequently adjusted by the Department of Transportation to depict a cost of $13,780. The Department of Transportation estimate was based upon information within its computer related to a system unlike the enhanced software contemplated by the plans and specifications. In other words, the stored information in the Department of Transportation computer was not the same as contemplated by the plans and specifications in the Jacksonville project. Moreover, the initial estimate of Harland was based upon the idea of an extended software system, as opposed to an enhanced software system. Winko-Matic had bid $389,500 for the software in Item 681-102. That estimate was premised upon figures obtained from JHK and Associates, the group which Winko-Matic intended to use as its subcontractor for the enhanced software portion of the project. JHK developed the software and was responsible for systems integration of the Los Angeles, California, project, one of the locations in which UTCS enhanced software has been utilized. JHK premised its estimate for the software hare upon experience in Los Angeles and an evaluation of the tasks to be performed related to the enhanced software. This included general software development activities, hardware innovation, installation costs during the period of acceptance and testing, and the preparation of data base. The JHK bid price was $339,500. Another $50,000 was added to that price related to what the Petitioner describes as its management costs for that item. By June 20, 1984, when a further meeting was held by the awards committee on the subject of the Jacksonville project, it was concluded that the estimate made by the Department of Transportation of $13,780 was not correct, on the topic of the enhanced software. A more reasonable estimate, according to the information imparted in this session, would be $200,000 for enhanced software as called for in this project, with a $100,000 amount being a reasonable estimate had they chosen to use extended software. Adjusting the initial price related to the UTCS enhanced software to reflect a corrected estimate of the Department of Transportation in its original advertised bid, that estimate becomes $2,210,900.61 and its consultant Harland's estimate becomes $2,243,130. With this adjustment, the differential in the estimate made by the Department of Transportation and the Petitioner approaches 3 percent and not the 12.6 percent originally found. The 3 percent is below the threshold of 7 percent used as the policy for determining whether a bid might be rejected as being far beyond the acceptable limits set forth in the Department of Transportation's estimate. In the aforementioned June 20, 1984, awards committee meeting, the Department of Transportation continued to hold the opinion that all bids in the Jacksonville project should be rejected and the matter re-advertised. Although the problem pertaining to the estimate of the cost of the enhanced software package had been addressed, the committee continued to feel that the prices received in the bid letting were erratic Reference was also made to revisions or modifications to the project plan which would be offered if the matter were re- advertised. It was also pointed out that the Federal Highway Administration would concur in the Department's decision to reject all bids and would accept modifications. The awards committee again voted to reject the bids. The matter was again considered by the awards committee on August 31, 1984. On that occasion, it was pointed out that the revisions contemplated by the Department of Transportation, should the matter be re-advertised, would not affect in a substantial way the cost estimate for the project with the exception of Item 680-101, the system control equipment (CPU), which would promote a lower price for the project. The committee determined in the August, 1984, meeting to reject all bids and re-advertise. While the initial notice of rejection of May 4, 1984, had suggested the basis for rejection as being the fact that Petitioner's bid far exceeded the 7 percent allowance for price above the Department of Transportation's estimate of costs, the meetings of the awards committee and the suggestion of the Respondent in the course of the final hearing in this case indicated that there were other reasons for the decision to reject. Those Were: (a) an apparent lack of clarity among bidders regarding specifications for the Jacksonville job, (b) the desire of the Respondent to revise specifications on the Jacksonville project; and (c) a lack of sufficient competition in the bids. In connection with the first of the additional reasons Respondent suggests that variations within the bid responses related to particular line items within the specifications point out a lack of clarity in the project's specifications or confusion by bidders related to those specifications. Respondent did not bring forth any of the bidders who might speak to the matter of possible confusion or misunderstanding concerning some of the bid items. By contrast, the Petitioner's president; the president of JHK & Associates and James Robinson, Harland's project manager for the Jacksonville job, did not find the specifications in the original documents to be confusing. In addition, the testimony of those individuals established the fact that bid variations related to particular line items are not extraordinary and do not establish any apparent confusion by the bidders as to the requirements of those line items. In effect, what the differentials demonstrate are variations related to the manufacture or in-house capabilities of the bidders and an effort to allocate discretionary costs in various places as to line items. Moreover, they might indicate last- minute adjustments in the bid quote prior to the opening and a possible effort by a contractor to enter into a new job market. Finally, they demonstrate offsetting which is the allocation of item prices by a contractor to maximize profits. To do this, a contractor submits high bids on items representing quantities which the contractor feels will increase after the contract is awarded and submits low bids on items representing quantities which are not likely to change. In summary, while the Department of Transportation in its presentation expressed some concern about the variations in the pricing in the bid quotations offered by the respective bidders in this project, its suspicions on the question of the possible clarity of its specifications were not confirmed and are not convincing. On the topic of revisions which the Department of Transportation would offer if the matter were re-advertised, with one exception those matters appear to be items that could be attended through change orders or supplemental agreements. They are not matters which necessarily must be addressed through a rejection of all bids and a re-advertising of the project. The lone exception to this is the possibility that the Department of Transportation may not be able to protect its proprietary rights in the enhanced software which is being developed for the project, under the terms of the present bid documents. Given that uncertainty, the Respondent would wish to re-advertise the project and make certain that its proprietary interests are protected. Finally, Respondent has alluded to the fact that the Jacksonville project should be re-advertised in view of the lack of competition in the initial letting. Only four bidders expressed an interest in this project at the time of the first letting. Of those, two bidders were found to be responsive. While this is a low number of bidders, there does not appear to be any agency practice on the part of' the Department of Transportation to the effect that this number of bidders would not be accepted. Moreover, no indication has been given that should the matter be re-advertised a greater number of bidders would express an interest than was the case in the first letting. Consequently, this reason for bid rejection is not acceptable. If Respondent did not reject the bids and re-advertise the project, Winko-Matic would be the successful bidder in the Jacksonville project.

Florida Laws (3) 120.53120.57337.11
# 1
MIDDLESEX CORPORATION AND AFFILIATES, INC. vs DEPARTMENT OF TRANSPORTATION, 92-004858BID (1992)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 10, 1992 Number: 92-004858BID Latest Update: Jan. 12, 1993

The Issue The issue in this proceeding is whether Petitioner, The Middlesex Corporation and Affiliates (Middlesex) or Intevenor, J. B. Coxwell Contracting, Inc. (J. B. Coxwell), submitted the lowest and best responsive bid for State Project No. 55040-3521 let by the Florida Department of Transportation (FDOT).

Findings Of Fact The Florida Department of Transportation issued an invitation to bid (ITB) for a contract to construct road improvements on State Road 363 in Tallahassee, Leon County, Florida; Project No. 55040-3521. The ITB incorporated the plans and specifications for the proposed highway improvements. The specifications stated in pertinent part: Article 1-3. . . . for the purpose of award, after the proposals are opened and read, the correct summation of the products of the approximate quantities shown in the proposal, by the unit prices, will be considered the bid. . . . . Until the actual award of the contract, however, the right will be reserved to reject any or all proposals and to waive technical errors as may be deemed in the best interest of the State. . . . .(emphasis supplied) Article 2-6. A proposal will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, additions not called for, conditional or unauthorized alternate bids, or irregularities of any kind; also if the unit prices are obviously unbalanced, either in excess of or below the reasonable costs analysis values. In addition to the specifications, a part of the plans for the project required the successful bidder to perform substantial excavation work on the project site. The excavation work would more likely than not yield enough fill material to complete any fill or embankments required in the project. Therefore, the plans contemplated that the soils obtained from the excavation work would be used for the construction of an estimated 44,000 cubic yards of embankment in the project. In order to achieve this goal, page seven of the plans entitled "The Summary of Quantities" indicated that embankment was to be a "no-pay item". However, the bid proposal, the form which constitutes the actual bid of the contractor, contained a line item for a price quotation for embankment/fill, Item No. 120-6. By including such a line item in the bid proposal, bidders were required to submit some figure for this item or risk their bid being declared irregular under the specifications for this project. There was no timely objection filed by any bidder indicating that the bidder would be prejudiced by treatment of the embankment/fill item as a no-pay or as a pay item. Likewise, there was no timely challenge to the apparently conflicting plans and pay item sheet or that the conflicting plans and pay item sheet created a stiutaion which prohibited a bidder from submitting a responsive bid. Seven bids for the contract were submitted and opened on May 27, 1992. The three apparent lowest bids at the opening were: Anderson-Columbia at $4,251,147.89; J. B. Coxwell at $4,964,327.81; and Middlesex at $4,977,371.48. After the bids were opened, each bid was reviewed by FDOT's Technical Review Committee (TRC) to determine whether the bid was mathematically and materially unbalanced, contained all appropriate signatures, contained all appropriate documents and otherwise met the technical requirements of the ITB. In essence, the TRC reviews each bid to determine whether it is responsive to the bid proposal and, if not responsive whether the bid's lack of responsiveness is immaterial and waivable by FDOT. After its review of all the bids, the TRC then makes a recommendation to FDOT's Contract Awards Committee on whether a bid should be rejected for material nonresponsiveness to the ITB. In this case, the TRC recommended to the Contract Awards Committee that Anderson-Columbia's bid be rejected as nonresponsive to the ITB. On June 16, 1992, FDOT's Contract Awards Committee adopted the recommendation of the Technical Review Committee and declared Anderson-Columbia's bid nonresponsive. The awards committee also voted to award the bid to J. B. Coxwell as the second responsive low bidder and on July 6, 1992, FDOT posted a notice of intent to award the contract to J. B. Coxwell. In making the award, FDOT looked at the impact of the conflict between the plans and the bid proposal sheet. FDOT's practice is to add all the unit prices listed on the bid proposal sheet to determine the total amount of the bid. FDOT has never deleted an item from the unit price list to determine the amount of a bid. Following these policies and Consistent with Article 3-1 of the specifications, FDOT determined that a bidder's price quote for the enbankment/fill item would be included as a pay item in the total bid despite the plan's indication that embankment/fill would be a no-pay item and despite the fact that the embankment item probably will not be paid as long as the fill required is less than the excavation. However, at the time of bidding, no bidder could be certain that FDOT would choose to pay or not pay item 120-6. In this case, a review of the bids demonstrates that bidders were not uniform in their application of the conflict between the plans and bid proposal sheet in developing their specific bids. Some bidder's, like J. B. Coxwell, bid very low prices for the embankment/fill in their bid. Some bidder's, like Middlesex, bid prices for the embankment/fill item closer to the average unit price for embankment/fill. In any event, no bidder received any advantage over another bidder due to the conflicting designation of the embankment/fill item and no bidder was favored or discriminated against because of the conflict. In short, all bidders received the same plans and bid proposal, reacted to them in the normal course of their businesses and prepared their bids according to those dictates. The evidence did not demonstrate that the conflict between the plans and bid proposal sheet or FDOT's handling of the conflict was so unfair or confusing that the conflict completely impeded or subverted the purpose or fairness of the competitive bidding process. J. B. Coxwell. Finally, as indicated, the TRC reviews bids to determine whether they are materially unbalanced. In general, unbalanced bids are discouraged by the Department because an unbalanced bid has the potential to allow the contractor to recoup or receive a larger portion of the contract price at the beginning of the contract term thereby making it less disadvantageous for the contractor to walk away from the contract and making agency control over the contractor more difficult. However, not all unbalanced bids will be rejected by FDOT because mathematically unbalanced bids often will have no material impact on the order of the bidders or the interests of the state in the timely and orderly performance of a given road project. Additionally, because of the nature of a given project, there may be a very good reason for a contractor to submit a mathematicallly unbalanced bid. In fact, approximately 80% of all the bids submitted to FDOT contain some form of mathematical unbalancing. Given these facts, FDOT will only reject an unbalanced bid if the unbalancing is material to the project and its award. In evaluating unbalanced bids, FDOT follows the guidance in a May, 1988, memorandum from the Federal Highway Administration (FHWA), which addresses bid analysis and unbalanced bids. The memorandum provides that where unit prices for items bid are either unusually high or low in relation to the engineer's estimate of the price (or mathematically unbalanced), the accuracy of the estimated quantities of the items are to be checked. If the quantities are reasonably accurate, the bid is to be further evaluated to determine whether the mathematical imbalance is "materially unbalanced" such that there is "reasonable doubt that award to the bidder submitting the mathematically unbalanced bid will result in the lowest ultimate cost to the Government." The analysis of a mathematically unbalanced bid to determine if it is materially unbalanced considers the effect of the unbalanced bid on the total contract amount; the increase, if any, in the contract cost when quantities are corrected; whether the low bidder will remain as the low bidder; and whether the unbalanced bid would have a potential detrimental effect upon the competitive process or cause contract administration problems later. In this case, FDOT compared the unit prices (line item prices) by each bidder on the bid proposal sheet to the average unit price for that item. The average unit price is based upon an average of the bidders' unit prices bid for a given pay item and the Department's estimated unit price for that item. If an individual bidder's unit price is significantly greater or less than the average price, FDOT's computer flags the item as mathematically unbalanced. Such a bid then receives further evaluation by FDOT to ensure the accuracy of the original estimates of the quantities of those items for which an unbalanced unit price has been submitted. FDOT also reviews the project plans for accuracy. The more in-depth review is performed to determine if there is a potential for a cost overrun or if there is an error in FDOT's estimated quantities which would result in an increased cost to the State for the project. In this case, J. B. Coxwell and Middlesex submitted bid proposals for each of the individual line item prices contained on FDOT's form. J. B. Coxwell's unit price for the embankment/fill item was $.10 per cubic yard of fill. FDOT's average price for the embankment/fill item was $3.20. The Middlesex quotation for embankment/fill was $2.25 per cubic yard of fill. FDOT's computer analysis of J. B. Coxwell's bid flagged the embankment/fill item as mathematically unbalanced. The quote by Middlesex for the embankment/fill item was not unbalanced and therefore was not flagged for furhter review by FDOT. However, the Middlesex bid was flagged as unbalanced for other line item quotations contained in its bid proposal. FDOT then made a more in-depth review of the bid of J. B. Coxwell and determined that although the bid was mathematically unbalanced, it was not materially unbalanced and did not result in a change in the bidding order. This determination was primarily based on the fact that the excavation portion of the project would yield enough fill to perform the embankment portion of the contract. Thus, a lower than average price in that item was not detrimental to the state, but, in fact, was in its best interest since a quote closer to FDOT's average would cause the state to be double billed for the fill FDOT's site would supply. There is no question that this was a reasonable analysis of the project in this case. Similarly, FDOT, utilizing the same analysis for unbalanced bids, also determined that the mathematically unbalanced unit prices submitted in the Middlesex bid were not materially unbalanced. Given the fact that Middlesex also had a mathematically unbalanced bid, which received the same analysis, Petitioner's argument that Coxwell's mathematically unbalanced bid should be rejected for such imbalance is rejected. Therefore, Middlesex has failed to demonstrate that it submitted the best responsive bid for State Project No. 55040-3521 and its protest should be dismissed.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered awarding the bid to J. B. Coxwell and dismissing Petitioner's protest. DONE AND ENTERED this 8th day of December, 1992, in Tallahassee, Leon County, Florida. DIANNE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings thes 8th day of December, 1992

Florida Laws (3) 120.53120.57337.11
# 2
W. P. AUSTIN CONSTRUCTION CORP. vs DEPARTMENT OF MANAGEMENT SERVICES, 94-006082BID (1994)
Division of Administrative Hearings, Florida Filed:Miami, Florida Oct. 28, 1994 Number: 94-006082BID Latest Update: Aug. 10, 1995

Findings Of Fact On August 31, 1994, the Respondent received and opened bids for its Project No. HSMV 92044000, Repairs, Art Sutton Drivers' License Office, Miami, Florida (the Project). The bid specification documents (the Specifications) for the Project included requirements for a Base Bid and for specific alternate proposals with respect to three defined items of alternate work. Section 01100 of the Specifications stated that "[a]ll Alternates described in this Section are required to be reflected on the Bid Form as submitted by the bidder." Part 2 of that section provided: ALTERNATE NO. 1 A. Provide a deductive price to the base bid for the removal of existing window units and the installation of new units as indicated in plans and specification Section 08520. ALTERNATE NO. 2 A. Provide a deductive price to the base bid for the provision of communications conductors see specification Section 16400. ALTERNATE No. 3 A. Provide a deductive price to the base bid for the installation of all landscape materials as indicated on plans and as per specification Section 02960. Also included in the Specifications as Exhibit 4 was a Proposal Form. The Specifications required each bidder to submit this form in triplicate on the bidder's letterhead. With respect to alternates, the Proposal Form required: With the foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications. Alternate No. 1 Add or Deduct $ Alternate No. 2 Add or Deduct $ Alternate No. 3 Add or Deduct $ The Respondent's architect received four bids on August 31, 1994. As recorded on the Bid Tabulation and Notice of Award Recommendation, three bidders provided specific prices for the three alternates, as well as a Base Bid. The Bid Tabulation shows that two bidders provided specific prices for the three alternates and included the alternate prices in their Base Bids. The Petitioner provided specific prices for the three alternates, but excluded the alternate prices from its Base Bid. The fourth bidder provided a specific price for only one alternate and excluded that alternate price from its Base Bid. (The fourth bidder was disqualified as non-responsive for failing to submit prices on all three alternates.) In pertinent part, the Petitioner's proposal read: With the foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications: Alternate No. 1 Add or Deduct . . . $4,400.00 Alternate No. 2 Add or Deduct . . . $1,158.00 Alternate No. 3 Add or Deduct . . . $2,084.00 These Alternates were in addition to the Petitioner's Base bid of $204,322.00. The proposal form submitted by the Petitioner comports with Exhibit 4 to the Specifications, which was the mandatory Proposal Form. On August 31, 1994, William Phillip Austin, Peitioner's President, wrote the architect: Per our telephone conversation this date regard- ing the confusion relating to the Add/Deduct for Alternates 1, 2 and 3 for the above project, please be advised that our base bid did not include the work described in the Alternates. As stated if you want work described in Alternates 1, 2 and 3, you must add the cost to our base bid. The base bid including Alternates 1, 2 and 3 would, therefore, be $211,964.00. If we can provide additional information, please do not hesitate to contact us. The Respondent's architect completed and submitted the bid Tabulation and Notice of Award Recommendation to the Respondent in early September. The document clearly discloses the amounts of each bidder's Base Bid and Alternate proposals. Using plus (+) and minus (-) signs, the Bid Tabulation further shows each bidder's method of calculation. The record is devoid of evidence that the Respondent had any problem in evaluating the bids and identifying the lowest bidder. The Petitioner was the lowest bidder on any combination of base bid plus or minus any or all alternates. Subsequently the Petitioner received a NOTICE OF AWARD RECOMMENDATION dated October 4, 1994. The Notice informed the Petitioner that the Respondent "has recommended that the contract be awarded to your firm in the total amount of $211,964.00, accepting the Base Bid and Alternates #1, #2 & #3. The Administrator of Contracts Design and Permitting, Division of Building Construction, Department of Management Services, State of Florida will consider this recommendation." Larry R. Coleman, Construction Projects Administrator, signed the letter. The Petitioner acknowledged receipt. A representative of the second lowest bidder, Kalex Construction, then contacted the Respondent, complaining of the Award Recommendation. The grounds for the Kalex complaint are not in the record. However, on October 14, 1994, H. R. Hough, the Respondent's Contracts Administrator, sent the Petitioner a letter "to notify you of the State's decision to reject all bids on the above referenced project due to ambiguities in the specifications." Mr. Hough's reasons for the rejection are "other than those stated by the protestor," Kalex. The Respondent's Rule 60D-5.007, Florida Administrative Code, states: Determination of Successful Bidder. All projects except where competitive bidding is waived under the provisions of Rule 60D-5.008 will be publicly bid in accordance with the provisions in the project specifications bidding documents. Award of contract will be made to the responsive bidder, determined to be qualified in accordance with the provisions herein and meeting the requirements of the bidding documents, that submits the lowest valid bid for the work. The lowest bid will be determined as follows: The lowest bid will be the bid from the responsive bidder that has submitted the lowest price for the base bid or the base bid plus the additive alternates or less the deductive alternates chosen by the Agency to be included in or excluded from the proposed contract, taken in numerical order listed in the bid documents. The order of the alternates may be selected by the Agency in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. Under the above-quoted rule, the Respondent compares bids beginning with the lowest "base bid." The Respondent is of the view that for this comparison to be fair and equal, all bidders must include the same scope of work in the "base bid." The Respondent does not interpret the above-quoted rule to allow deductive alternates from some bidders and additive alternates from others. (For reasons discussed in the Conclusions of Law which follow, the Respondent's interpretation and application of the above-quoted rule is erroneous.) The Specifications contain some ambiguous and inconsistent language regarding whether alternates should be treated as additive or deductive. The ambiguous and inconsistent language did not provide any bidder with an advantage or a disadvantage, nor did it otherwise affect the fairness of the bidding process.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Management Services issue a Final Order in this case awarding a contract for the subject project to the Petitioner. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 16th day of December 1994. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of December 1994. APPENDIX The following are my specific rulings on all proposed findings of fact submitted by all parties. Proposed findings submitted by Petitioner Paragraph 1: This is primarily a statement of position and is addressed in the Preliminary Statement. Paragraphs 2 through 10: Accepted in substance with a few unnecessary details omitted. Proposed findings submitted by Respondent Paragraphs 1 through 6: Accepted in substance. Paragraph 7: First sentence accepted in substance. Second sentence rejected as constituting a conclusion which is not warranted by the evidence. Third sentence is accepted as an accurate statement of how Respondent has been interpreting the subject rule, but is not accepted as constituting a correct interpretation of the rule. Paragraph 8: Rejected as misleading and confusing because the "scope of work" to be performed under the contract can only be determined after the Respondent decides which alternates to include and which to exclude. Paragraph 9: The first two sentences are accepted in substance. The last sentence is rejected as constituting a conclusion which is not warranted by the evidence. COPIES FURNISHED: Timothy J. Armstrong, Esquire Armstrong & Mejer Suite 1111 Douglas Centre 2600 Douglas Road Coral Gables, Florida 33134 Stephen S. Mathues, Esquire Department of General Services Knight Building, Suite 312 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950 Paul A. Rowell, General Counsel Department of General Services Knight Building, Suite 312 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950 William H. Lindner, Secretary Department of General Services Knight Building, Suite 307 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950

Florida Laws (2) 120.53120.57 Florida Administrative Code (2) 60D-5.00760D-5.008
# 3
THE HARTER GROUP vs PINELLAS COUNTY SCHOOL BOARD, 90-003261BID (1990)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida May 25, 1990 Number: 90-003261BID Latest Update: Jul. 17, 1990

Findings Of Fact In order to meet its need for new equipment in the new district administration building, the School Board advertised for competitive bid proposals for clerical, professional task, guest and conference chairs (task seating). Five bids were timely received by the School Board, two of which were determined to be responsive. The bid opening occurred on April 17 1990, and the Knoll Source was determined to be the lowest responsive bidder. In spite of this determination, the bid was rejected by the Director of Purchasing or the appointed designee because sales tax was not included in the bid. The Notice of Award was issued to Haworth, who submitted its bid showing the price it was willing to accept for the sale of the task seating, with and without sales tax. The initial decision to reject the Knoll Source bid, which was $10,393.72 less than Haworth in Sequence I; $12,231.94 less in Sequence II; and $994.17 less in Sequence III, was based upon Section 9.2.2.a in the "Instructions to Interior Bidders". This section of the bid documents provided that the contract for purchase of the task seating would not be exempt from sales tax. This bid specification is incorrect because the School Board does not pay sales tax on acquisitions of furnishings for the Pinellas County School System. Knoll Source was aware of the School Board's sales tax exemption prior to its bid submission. As Section 9.2.2.a of the instructions was inappropriate, the vendor relied on Section 9.2.2.c, and excluded sales tax from the bid because the cost of such tax was not applicable. Section 9.2.2.c instructed bidders to exclude inapplicable taxes from their bids. Pursuant to Section 5.3.1 of the bid instructions, the School Board has the right to waive any irregularity in any bid received and to accept the bid which, in the Board's judgment, is in its own best interest. The Knoll Source and Haworth bids can be comparatively reviewed, and Knoll Source is the lowest responsive bidder if the failure to include sales tax in the bid amount is waived by the School Board. It is in the Board's best interest to waive Knoll Source's failure to include a sales tax in the bid because sales tax does not apply to this purchase.

Florida Laws (2) 120.53120.57
# 4
NELSON P. DAVIS vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003868BID (1988)
Division of Administrative Hearings, Florida Number: 88-003868BID Latest Update: Sep. 28, 1988

Findings Of Fact The Department of Health and Rehabilitative Services currently leases approximately 22,000 square feet of space from Nelson P. Davis. The space is contained in two separate buildings, both located at 417 Racetrack Road, Ft. Walton Beach, Florida. The Department and Davis were involved in a legal dispute involving the currently leased premises, which concluded in 1986 with the entry of judgment in Davis' favor. While some antagonism remains between the parties related to the legal action instituted by Davis, Davis has been an acceptable landlord in all other respects. The current lease expires February 1, 1989. Davis has been aware, since late February or early March of 1988, that the Department would need space in excess of the currently occupied 22,000 square feet, but was not aware of the actual additional space requirements until the issuance of the invitation to bid. In general, the Department's space requirements have increased annually. In response to the anticipated need for additional space, Davis initiated plans for design of a third Racetrack Road building that could meet the additional need, but did not construct the facility. In response to the space requirements of previous years, Davis has constructed additional space. The Department has occupied the additional space in such proportions as to avoid the competitive bidding process, however, the current need for additional space exceeds the maximum which can be leased without competitive bidding. The Department on May 11, 1988, issued an invitation to Bid for approximately 26,165 square feet of space in Ft. Walton Beach, Florida. (HO #1) In response to the invitation, Davis submitted a bid proposal. The Davis proposal, the sole proposal received by the Department, was disqualified by the Department as non-responsive. On June 23, 1988, the sole bid was opened by Joseph Pastucha, HRS District One Facilities Manager, who initially reviewed the Davis bid. Mr. Pastucha identified items of concern related to the responsiveness of the bid and then provided the information to his supervisor, who in turn provided the information to Mr. James Peters. The Department did not contact Davis for further information or to provide the opportunity to correct any defects. James Peters, HRS's District One Manager for Administrative Services has expressed on at least one occasion a desire to avoid entering into business arrangements with Nelson P. Davis. The bases for Peters' opinion is the earlier litigation between the parties. Peters was on the committee which was to have evaluated bids submitted in response to the invitation. However, Peters has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that Peters based his opinion regarding the Davis bid submission solely on the earlier litigation or that any other person involved in the agency's action permitted personal opinions to affect the decisional process. Davis' bid proposal included the two buildings constituting approximately 22,000 square feet located at 417 Racetrack Road which the Department currently occupies, plus a third building of approximately 4,000 square feet. The proposed square footage and lease cost were acceptable. The third building was to be either a planned, unconstructed building located at the 417 Racetrack Road location or an existing building located "7/l0ths of a mile southeast of the present HRS offices," (the off-site building). However, a memorandum attached to Davis' submission stated that he did not intend to use the off-site building for HRS purposes, (HO #2). Further, Davis had previously indicated in conversation with the HRS manager of the 417 Racetrack Road offices that he planned to utilize the off-site space otherwise. On page one of the bid submittal form Davis indicated the address of the proposed location as 417 Racetrack Road. By letter dated July 5, 1988, the Department notified Davis that his bid offering was deemed non-responsive and that the Department expected to readvertise for space in Ft. Walton Beach. The letter made no mention of any opportunity to protest the determination. The statement, "[f]ailure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes," which is required to be included in the notice of agency decision by Section 120.53(5)(a), Florida Statutes, was omitted by the Department. (HO #3) On or about July 7, 1988, Davis contacted the Department of General Services to express his dismay regarding the disqualification of his submittal. A meeting, held on or about July 19, 1988, between Davis and Department representatives, did not alter the Department's position. On or about July 25, 1988, the written notice of protest and request for hearing was filed. The Department forwarded the request to the Division of Administrative Hearings. The letter dated July 5, 1988, advising Davis that his bid was deemed non-responsive enumerated five reasons for the Department's decision. The reasons stated were: No photograph of the proposed facility was submitted as requested; No floor plan of the facility was submitted as requested; A substituted site was submitted Proposed space was not an existing building and was not measurable; Three buildings in bid proposal constitute three locations and are unacceptable. The letter was signed by Chuck Bates, DHRS Deputy District Administrator, District One. The letter was drafted by James Peters. (HO #3) Mr. Bates relied upon Peters and Pastucha to provide information sufficient to justify the disqualification of the bid, and was satisfied that the action was justified prior to signing the letter. Examination of the bid submittal package reveals that Davis failed to acknowledge by initial the requirements of page seven, but that he did, on that page, appropriately respond to questions related to proposed parking spaces being bid. The Department did not base the disqualification of the bid on the failure to acknowledge the page and did not include the failure to initial the page in the stated reasons for deeming the bid non-responsive. Paragraph 9(a) of the bid submittal form requires the submission of a clear photograph of the exterior front of the building. (HO #2) Davis submitted no photographs. Paragraph 9(b) of the bid submittal form requires the submission of a scaled floor plan showing present configurations with measurements. (HO #2) Davis submitted floor plans for the proposed-to-be-constructed building and for the off-site building, but failed to submit floor plans for the two buildings which the Department currently occupies. The bid also failed to include calculations of net rentable square footage related to the omitted floor plans. The letter to Davis stated that an additional reason for disqualification of his bid from further consideration was the submission of a substituted site, (HO #3). The "substituted site" refers to Davis' inclusion of the off-site building not identified in the bid submission other than by the statement that the building was located seven-tenths of a mile southeast of the present HRS office location. No map, street address, legal description, or other identifying information was submitted. The proposal submitted by Davis included plans to construct a third building at 417 Racetrack Road, which was rejected as not measurable. The invitation to bid states that to be considered, the space must be existing, dry and physically measurable, at the time of bid submitted. (HO #1) The proposed third building clearly fails to meet this requirement. While the Department may permit the correction of minor deficiencies, the deficiencies were adjudged by the Department to be more than minor. The proposal's inclusion of nonexisting space (Racetrack Road building #3) or in the alternative a building, the location of which can not be determined from the bid information and which the bidder apparently intends not to provide, is non- responsive to the specifications of the invitation. As to the fifth enumerated reason for disqualification of the bid (three buildings/three locations) the Department and Petitioner presented extensive testimony related to paragraph 3(b) of page 15 of the bid submittal form. Page 15 of the bid submittal form is titled "Evaluation Criteria" and contains a list of weighted factors which were to be used in the evaluation of bids. (HO #2) Paragraph 3(b) states, as one factor for consideration in evaluation, whether the bid provides for the required aggregate square footage in a single building, and continues, "[p]roposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within yards of each other." (HO #2) The space left for the specification of maximum yardage was erroneously left uncompleted by the Department and the Department did not learn of the error until the bid was submitted. The Department's disqualification of the bid on this basis relies on the Department's assertion that the three buildings included in the Davis proposal constitute three locations and that a responsive bid may contain not more than two locations. The Department's position is that "location" and "building" are synonymous and that paragraph 3(b) of the evaluation criteria prohibits consideration of a bid submission including more than two buildings. The Department's position is rejected as arbitrary. The bid package does not state that proposals including more than two buildings will be disqualified. The sole reference to the number of buildings in a responsive bid submission is as stated and contained on the page of "Evaluation Criteria", wherein it is identified with a weighting factor of five percent of total possible points.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-3868BID. DONE and ENTERED this 28th day of September, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of September, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-3868BID The following constitute rulings on the proposed findings of fact submitted by the parties. Petitioner: Accepted in part. The use of the word "required in the fourth sentence is rejected. The referenced section relates to evaluation factors, not specific requirements. Accepted. Accepted in part. The third building was proposed as either the off-site building or the planned, non-existent space. Accepted. Accepted. Accepted. Rejected as restatement of testimony. Other testimony indicated that Petitioner planned to use the off-site location for non-HRS purposes. Rejected, immaterial. Accepted. Accepted. Accepted as modified. Accepted in part. The use of the word "technical" is rejected. Accepted. Accepted as modified. Accepted as modified. Accepted. Accepted. Accepted. Accepted as modified. Accepted as modified. Accepted as modified. The change between the two invitations to bid was to clarify the obvious confusion related to the use of terms "location" and "building" and was made not to the bid specifications but to evaluation criteria. Rejected as restatement of testimony. Rejected, conclusion of law. Accepted so far as relevant. While the Davis bid was disqualified as non-responsive, the right to reject any and all bids encompasses the disqualification of a bid as non-responsive to the specific requirements of an invitation to bid. Respondent: Rejected, conclusion of law. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. Floor plan of the off-site building was submitted showing that the building is essentially a hollow, box-like structure. Accepted. Accepted. Accepted. Rejected, irrelevant. While the usual distance may be 100 yards, the actual bid specifications do not state such. Further the sole reference to the distance between "locations" was contained in evaluation criteria. At no time prior to the June 23, 1988 bid opening did the Department attempt to identify the preferred distance between locations. Accepted. Accepted. Accepted. COPIES FURNISHED: Bruce A. McDonald, Esquire Post Office Box 887, Suite 105 151 Mary Esther Cutoff Mary Esther, Florida 32569 Rodney M. Johnson, Esquire Acting District One Legal Counsel Post Office Box 8420 Pensacola, Florida 32505-8420 Joseph J. Pastucha 3300 North Pace Boulevard Room 109 Town & Country Plaza Pensacola, Florida 32505 Jan Kline 417 Racetrack Road Ft. Walton Beach, Florida 32548 James V. Peters Department of General Services 160 Governmental Center Fourth Floor, Room 412 Pensacola, Florida 32501 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Tom Batchelor Staff Director House HRS Committee The Capitol Tallahassee, Florida 32399-1300

Florida Laws (2) 120.53120.57
# 5
D. E. WALLACE CONSTRUCTION CORPORATION vs BOARD OF REGENTS, 89-006844BID (1989)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Dec. 13, 1989 Number: 89-006844BID Latest Update: Feb. 26, 1990

Findings Of Fact Respondent issued a Call For Bids, in Florida Administrative Weekly, Volume 15, No. 38, September 22, 1989, for a construction project referred to as the Reitz Union Addition, BR-116, University of Florida. The Call For Bids provided that at least 15 percent of the project contract amount would be expended with minority business enterprises certified by the Florida Department of General Services as set forth under the Florida Small and Minority Business Assistance Act, Chapter 287, Florida Statutes. If 15 percent were not obtainable, the State University System would recognize good faith efforts by the bidder. The Call For Bids provided that all bidders must be qualified at the time of their Bid Proposal in accordance with the Instructions to Bidders, Article B-2. The Instructions to Bidders, Article B-2, provides in pertinent part that in order to be eligible to submit a Bid Proposal, a bidder must meet any special requirements set forth in the Special Conditions of the Project Manual. The Project Manual Index provides that "L-Special Conditions" pages are numbered separately. The Project Manual, Instructions to Bidders B-23, as revised by Section L, Special Conditions, Supplement #1, at supplement page 2, provides that the contract will be awarded by Respondent for projects of $500,000 or more, to the lowest qualified bidder, provided it is in the best interest of the Respondent to accept it. The award of the contract is subject to the provisions of Section 237.0945, Florida Statutes, and the demonstration of "good faith effort" by any bidder whose Bid Proposal proposes less than 15 percent participation in the contract by MBEs. Demonstrated good faith effort as set forth in the Special Conditions would be in lieu of all or part of the 15 percent requirement. The contract award will be made to the bidder that submits the lowest responsive aggregate bid within the preestablished construction budget. The aggregate bid shall consist of the base bid plus accepted additive alternate bids, or less accepted deductive alternate bids, applied in the numerical order in which they are listed on the bid form. The Project Manual, Instructions to Bidders, B-25 at page 17, provides that the Respondent/Owner has adopted a program for the involvement of minority business enterprises in the construction program. The application of that program is set forth in the Special Conditions of the Project Manual. The Project Manual, Instructions to Bidders, B-26 at page 17, provides that bidders shall be thoroughly familiar with the Special Conditions and shall strictly adhere to their requirements. A representative from D.E. Wallace Construction Corp., Ms. Betsy Wallace, attended the pre-solicitation/pre-bid meeting on October 5, 1989. One of the purposes of the pre-solicitation/pre-bid meeting was to explain the MBE program to the general contractors and others in attendance. Mr. Larry Ellis, the minority purchasing coordinator for the University of Florida, provided the contractors with information as to how they could obtain the 15 percent minority participation requirement or how they could satisfy the requirements of the good faith effort. Mr. Ellis informed those in attendance that the listing of subcontractors form required that the bidder reveal the 15 percent MBE participation on the face of the form, that such form was located in the Special Conditions section, and that the form must be completed and submitted at the time of bid opening, if in fact the general contractor was seeking to show he or she had met the 15 percent participation requirement. Sealed bids for BR-116 were opened on October 19, 1989. Petitioner was the lowest monetary bidder. Anglin Construction Company, Intervenor, was the second lowest monetary bidder. Petitioner was notified by letter dated October 24, 1989, that its bid proposal was found not to be in compliance with the requirements of the Project Manual because an incorrect list of subcontractors form was submitted, that Petitioners proposed MBEs were not identified at the time of bid opening, and that Petitioner failed to show a good faith effort in meeting the 15 percent MBE participation. By letter dated October 30, 1989, the University of Florida recommended to the Respondent that the construction contract for BR-116 be awarded to the Intervenor for the base bid and alternates 1 through 9 in the amount of $991,272 The Project Manual for BR-116 contains Section L, Special Conditions, which contains Supplement 1, with pages numbered supplemental pages 1 through The Call for Bids provides that bids must be submitted in full and in accordance with the requirements of the drawings and Project Manual. The Project Manual provides that bidders are required to examine carefully the drawings, specifications, and other bidding documents and to inform themselves thoroughly regarding any and all conditions and requirements that may in any manner affect the work. Mr. D.E. Wallace testified that he is a certified general contractor licensed by the State of Florida for 13 years and that as part of his licensing examination he was required to demonstrate proficiency in reading and understanding bidding documents, manuals, instructions, plans, and drawings. Mr. Wallace testified that he skimmed over the Project Manual and the Special Conditions section but that he really did not review them. Petitioner submitted its list of subcontractors on an outdated form, dated January 20, 1988, contained in the Project Manual at Section D, page 21. In Supplement #1 of Section L, Special Conditions, at page 1, of the Project Manual, the bidder is instructed to delete the January 29, 1988, version of the subcontractors form and substitute in lieu thereof the List of Subcontractors form included in the Supplement dated June 15, 1988. The form was revised to allow contractors who could not meet the MBE requirements to show good faith effort in obtaining participation, to restrict MBEs, to those certified by the Florida Department of General Service, and to eliminate any bid shopping attempts by requiring that contractors reveal their MBE participation at the timed of the bid opening. Petitioner admitted that the wrong list of subcontractors form was used when its bid was submitted. The Respondents Project Manual contains a licensed version of a standard American Institute of Architects (AIA) document which could not be revised without AIA permission. The revised list of subcontractors form and revised MBE requirements were placed within the Special Conditions section of the Project Manual, which did not require AIAs permission. It is not unusual, in the construction industry, have supplemental or special conditions within a project manual. The construction budget for this project was $1,096,800. Petitioner did not submit its MBE subcontractors at the time of bid opening. Petitioner submitted its MBE plan on October 26, 1989, seven days after bid opening. Petitioners MBE subcontractor participation was less than 15 percent of the contract sum required for BR-116. The contract sum is comprised of the base bid and the alternates for the project.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Board of Regents enter a Final Order rejecting Wallace Construction Corporations bid for project BR-116, denying the protest, and awarding the contract for project BR-116 to Anglin Construction Company. DONE and ENTERED this 26th day of February, 1990, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of February, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 89-6844BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, D.E. Wallace Construction Corp. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 6(7). Proposed findings of fact 1, 3-5, 7, and 8 are subordinate to the facts actually found in this Recommended Order. Proposed findings of fact 2 and 9 are unsupported by the competent substantial evidence. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Florida Board of Regents 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-16(1-16). Specific Rulings on Proposed Findings of Fact Submitted by Intervenor, Anglin Construction Company Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding Of Fact which so adopts the proposed finding of fact: 2(6); 5,(8); and 6(16). Proposed findings of fact 1, 3, and 4 are subordinate to the facts actually found in this Recommended Order. COPIES FURNISHED: Gary Moody Attorney at Law Post Office Drawer 2759 Gainesville, Florida 32602 Jane Mostoller Assistant General Counsel Gregg A. Gleason General Counsel Florida Board of Regents 325 West Gaines Street, Suite 1522 Tallahassee, Florida 32399-1950 Raymond M. Ivey Attorney at Law 703 North Main Street, Suite A Gainesville, Florida 32601 Chancellor Charles B. Reed State University System of Florida 107 West Gaines Street Tallahassee, Florida 32399-1950 =================================================================

Florida Laws (4) 120.53120.57120.6814.021 Florida Administrative Code (1) 6C-14.021
# 6
SAXON BUSINESS PRODUCTS, INC. vs. DEPARTMENT OF GENERAL SERVICES, 81-002230 (1981)
Division of Administrative Hearings, Florida Number: 81-002230 Latest Update: Jun. 01, 1990

The Issue Whether Saxon Business Products, Inc.'s ("Saxon") response to the Department of General Services' invitation to bid for walk-up convenience copiers should be disqualified on grounds that: Saxon's omission of a supply price list was a material deviation from the bid specifications and conditions; and Saxon's walk-up convenience copier, model "Saxon 300," failed to prove two-sided copy capability.

Findings Of Fact I. Invitation to Bid On June 10, 1981, DGS issued invitation to Bid No. 544-600-38-B ("ITB") entitled, "Walk-Up Convenience Copiers; Bond Paper and Magazine Finish Bond Paper." The ITB proposes an annual contract under which state agencies and institutions can purchase copying machines. It contains general and special conditions and specifications, and warns vendors that bids that do not comply with such conditions "are subject to rejection." (Testimony of Celnik) The ITB specifications divide copiers into two groups: Group I, plain bond copiers, Group II, magazine finish copiers. The copiers are further categorized by type: Type I indicates minimum features; Type II indicates two- sided copying capability; Type III indicates one reduction capability; and Type IV indicates two or more reduction capabilities. These types are further separated into 12 classes on the basis of speed and volume (P-1.) The ITB special conditions instruct bidders to submit bid sheets 2/ breaking down all copying costs to a per-copy basis. Bids are to be evaluated and contracts awarded to bidders submitting the, lowest cost per copy in each category of copier. Cost per copy is calculated by using a specific cost formula. (P-1.) The ITB cost formula contains three components: machine cost, labor cost, and supply cost. DGS proposes to disqualify Saxon's bid in several categories of copiers for failure to supply a supply price list required by the supply cost component. This component provides, in relevant part: C) SUPPLY COST - The bidder shall compute supply costs on the Manufacturer's Brand. If there is an existing state con- tract for supplies for the manufacturer's brand equipment, the state contract price may be substituted. Supply costs will be rounded to six (6) decimal points. All other costs will also be rounded off to six (6) decimal points. The volume price used by the vendor to compute supply cost shall be based on the monthly median vol- ume of the type and class being bid. Supply cost submitted shall be firm for the contract period, except for paper, and all supply costs shall be current market price, verifiable. Vendor must submit supply price lists with his bid to substantiate that correct price vol- umes were used, unless state contract prices were used. A contract award may include supplies if deemed in the best interest of the State. By electing to substitute state contract supplies, the vendor is certifying that his equipment, using said supplies, will meet all per- formance requirements of this bid and of the equipment manufacturer. NOTE - All cost formulas will be verified by the Division of Purchasing and errors in extension will be corrected. In the event incorrect supply cost volumes are used by a bidder, the Division of Purchas- ing will adjust these costs to the median volume range. (e.s.)(P-1.) The purpose of the supply price list requirement, included in DGS's 1980 and 1981 ITB for convenience copiers, is to enable DGS to verify the supply cost figures shown on a vendor's bid sheets; in this way, DGS can insure that all vendors are using correct quantity pricing on their bid sheets. 3/ (In the past, some bidders had used lower supply prices, which were tied to high volume purchases; but those volumes frequently exceeded the state's needs and the median volumes specified by the ITB for each category of copier.) The verification procedure followed by DGS in both 1980 and 1981 involves checking the vendor's bid sheets against the prices shown on the supply price list. 4/ If DGS finds an inconsistency between the two, it "corrects" the bid sheet supply cost upward or downward to reflect the price shown on the supply price list. 5/ Such a bid sheet correction would also change the total median cost per copy, the factor used to evaluate competing bids. DGS also checks the supply list to determine whether it contains current market prices. (Testimony of Hittinger, Eberhard.) If a vendor fails to submit a supply price list, DGS cannot verify that the supply prices used on the bid sheet (to compute total median cost per copy) accurately reflect the median volumes specified in the ITB. Neither can DGS determine whether the supply prices used on the bid sheet are set prices, which do not vary with volume, or volume prices, which do; the bid sheets, on their face, do not reveal which type of pricing is being used. (Testimony of Eberhard; P-1.) After sealed bids are publicly opened, DGS has an established practice of not allowing any bidder to submit additional material which could alter price or other information previously submitted on bid sheets. DGS does, however, accept late information if it can be corroborated by an independent source. For example, a bidder might -- after bid opening -- supply its corporate charter number, which can be easily verified by contacting the Department of State. (Testimony of Hittinger, Eberhard.) The ITB special conditions also require DGS to test and approve copiers prior to bid opening. Copiers which are not tested and accepted by DGS are ineligible for a contract award: EQUIPMENT APPROVAL - Each item of equipment bid shall have been tested by the Division of Purchasing prior to the bid opening time and date for performance and reliability under normal working con- ditions. Any bidder whose equipment has not been tested shall provide a model of the equipment on which he intends to bid to a specified testing station, complete with all supplies, at no expense to the State. Testing will extend for a period of twenty (20) working days. In the event evaluation and acceptance of untested ma- chines has not been accomplished prior to the bid opening date and time, such machine shall not be eligible for an award. (P-1.) II. Bid Opening: Saxon's Failure to Submit Supply Price List Prior to the 1981 bid opening, Saxon failed to submit a supply price list in connection with its bid. This was apparently an oversight on its part; a year earlier, it had furnished a supply price list in response to a similar ITB for convenience copiers. Because of Saxon's omission, DGS was unable to verify the supply prices used by Saxon on its bid sheets or determine whether Saxon was utilizing set or volume prices. (Testimony of Eberhard, Celnik, Hittinger.) After bid opening, Saxon notified DGS that the supply prices shown on its bid sheets were set supply prices -- unit prices which do not vary with volume -- and confirmed that they are the supply prices which it now offers to the state. (Testimony of Celnik.) In its evaluation of the bids, DGS applied the requirement of a supply price list equally to all bidders. All bidders who omitted a supply price list were informed that they were disqualified. Saxon's bid was disqualified in five copier categories: Group I, Type I, Class I; Group I, Type I, Class II; Group I, Type I, Class IV; Group I, Type II, Class I; and Group I, Type II, Class II. At least 11 vendors, however, did submit supply price lists with their bid sheets; approximately one-third were set price lists, the remaining were volume price lists. (Testimony of Eberhard; P-3.) If a vendor could submit a supply price list after the bid opening, it could effectively decrease or increase its bid. (This is so because, in case of a conflict between the bid sheet supply price and the supply price list, the price list value will prevail. A change in the bid sheet supply price will change the cost per copy figure the determining factor in awarding contracts.) A vendor submitting a late supply price list would have an unfair advantage since it could change its bid after bid opening while its competitors could not. The competitive nature of the bidding process would be impaired. (Testimony of Hittinger, Eberhard.) Furthermore, if late submittal of a supply price list was allowed, a bidder could disqualify itself by refusing to provide it; the bidder would then have the advantage of revisiting its bid and -- if it chose -- withdrawing it after bid opening. The opportunity to withdraw a bid -- after bid opening -- would be an advantage not enjoyed by those who timely submitted supply price lists with their bids. (Testimony of Hittinger, Eberhard.) In some copier categories, the vendors who omitted supply price lists were the low bidders. If DGS disqualifies them for their omission, it must award the contract to the next highest bidder. The difference between those low bids and the next higher bid is substantial -- in some cases exceeding 23 percent. 6/ (Testimony of Celnik, Eberhard, Nee, Reinhart.) III. Failure of "Saxon 300" to Demonstrate Two-Sided Copying Capability In accordance with the ITB, Saxon submitted its "Saxon 300" copier to DGS for evaluation and testing. Prior to bid opening, DGS conducted a 20-day test of the machine. The "Saxon 300" machine which DGS tested lacked two-sided copying capability. It could reproduce clearly on one side, but not on the other. The "Saxon 300" sales literature and instruction manual submitted with the machine did not represent that the machine had two-sided copying capability. (Testimony of Nee; 1-5, 1-6, 1-7, R-2.) The "Saxon 300" may have two-sided copying capability, but only after special modifications are made to the copier. These modifications include removal of a roller device, replacement of the heating element, and replacement of the blower system. Saxon did not indicate at the time of testing, or in its bid, that the "Saxon 300" required such modification for two-sided copying capability. Neither did it indicate what, if any, additional costs would be charged for such modifications. (Testimony of Nee, Wallace; R-3.) After DGS tested the "Saxon 300," it sent Saxon a form letter indicating that the copier met minimum operating requirements. The letter did not inform Saxon that the machine lacked two-sided copying capability because DGS did not consider the lack of such capability a major malfunction in the equipment. (Testimony of Nee.) If a machine malfunctions, DGS has -- in the past -- allowed vendors to correct the deficiency or substitute another machine. (Testimony of Nee.) The Group I, Type II, Class I category of copiers, requires two-sided copying capability. Saxon bid its "Saxon 300" as a copier which meets this requirement. (Testimony of Celnik, Nee; P-1.)

Recommendation Based on the foregoing, it is RECOMMENDED: That Saxon's bids in Group I, Type I, Class I; Group I, Type I, Class II; Group I, Type I, Class IV; Group I, Type II, Class I; and Group I, Type II, Class II be disqualified; and That Saxon's bid in Group I, Type II, Class I be disqualified. DONE AND RECOMMENDED this 26th day of February, 1982, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of February, 1982.

Florida Laws (3) 1.02120.57287.042
# 7
ALL AMERICAN COMPANIES vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-002777BID (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 12, 2002 Number: 02-002777BID Latest Update: Oct. 25, 2002

The Issue At issue in this proceeding is whether the Department of Environmental Protection's decision to reject all bids submitted for the project entitled BDRS 52-01/02 was illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact Parties Petitioner, All America Homes of Gainesville, Inc. (All America), is a corporation doing business in the State of Florida. All America submitted a timely written bid in response to the Department's ITB and filed timely protests to the Department's actions. The Respondent, the Department of Environmental Protection, is an agency of the State of Florida which manages and operates state parks under its jurisdiction, and solicits construction projects in state parks, pursuant to Chapter 258, Part I, Florida Statutes, through its Division of Recreation and Parks, Bureau of Design and Recreation Services. The ITB In November, 2001, the Department issued an ITB on a construction project entitled Hillsborough River State Park Concession Building, project number BDRS 52-01/02. The ITB included the Bid Specifications for the project. Bids were required to be submitted no later than 3:30 p.m. on Tuesday, December 18, 2001, at the Bureau's Tallahassee, Florida, office. The written Specifications define several terms, including, but not limited, to the following: ADDENDUM: A written explanation, interpretation, change, correction, addition, deletion, or modification, affecting the contract documents, including drawings and specifications issued by the OWNER [Department] and distributed to the prospective Bidders prior to the bid opening. ALTERNATE BID: Separate optional bid item for more or less project requirement used for tailoring project to available funding. Also may consist of alternate construction techniques. BASE BID: Formal bid exclusive of any alternate bids. BID FORM: The official form on which the OWNER requires formal bids to be prepared and submitted. ORAL STATEMENTS: Verbal instruction. NOTE: No oral statement of any person, whomever shall in any manner or degree modify or otherwise affect the provisions of the contract documents.[1] SEALED BID: The formal written offer of the Bidder for the proposed work when submitted on the prescribed bid form, properly signed and guaranteed. The Bid Specifications also contained the following relevant sections: Alternatives If the OWNER wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use of type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically indicated and referenced to the drawings and specifications. Alternates will be listed in the bid form in such a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid. The OWNER will judge for himself that such alternates are of comparable character and quality to the specified items. The Order of the alternate may be selected by the Department in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. ADDENDA If the Consultant[2] finds it would be expedient to supplement, modify or interpret any portion of the bidding documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the bidding documents which will be delivered or mailed by the OWNER'S Contracts section to all bidders who have requested bidding documents. Interpretation No interpretation of the meaning of the drawings, specifications or other bidding documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction should be in writing, addressed to the Consultant. All such interpretations and supplemental instructions will be in the form of written Addenda to the bidding documents. Only the interpretation or correction so given by the Consultant in writing and approved by the OWNER shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the bidding documents. B-16 Bid Modification Bid modification will be accepted from Bidders, if addressed as indicated in Advertisement for Bids and if received prior to the opening of bids. No bid modification will be accepted after the close of bidding has been announced. Modifications will only be accepted if addressed in written or printed form submitted with the bid in sealed envelopes. Telegrams, facsimiles, separate sealed envelopes, written on printed modifications on the outside of the sealed envelopes will not be accepted. All bid modifications must be signed by an authorized representative of the Bidder. Modification will be read by the OWNER at the opening of formal bids. B-21 Rejection of Bids The OWNER reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida, and to reject the bid of a bidder who the OWNER determines is not in a position to perform the work. B-23 Award of Bid . . .The qualified Bidder submitting the lowest bid will be that Bidder who has submitted the lowest base bid plus any selected alternates. . . . The OWNER reserves the right to waive any minor irregularities in bids received when such waiver is in the interest of the OWNER. The Award of Bid will be issued by the OWNER only with responsible Bidders, found to meet all requirements for Award of Bid, qualified by experience and in a financial position to do the work specified. Each bidder shall, if so requested by the OWNER, present additional evidence of his experience, qualifications and ability to carry out the terms of the Agreement. (Emphasis in original, except for Section B-10.) The Bid Form is included with the Specifications and provides in part: Base Bid: Furnish labor, equipment, Lump Sum $ supervision and material to construct a new concession building of 2940 square feet located at the Hillsborough River State Park along with the alteration of the existing concession building according to plans and specifications. Alternate #1: Furnish labor, equipment, Add Amt.$__ supervision and material to renovate the existing concession building according to plans and specifications. There is a separate section for "Allowances," i.e., Section 01210, for the Hillsborough State Park. This section provides in part: SECTION 01210 – ALLOWANCES * * * 1.2 SUMMARY This Section includes administrative and procedural requirements governing allowances. Certain materials and equipment are specified in the Contract Documents and are defined by this [sic] specifications as material and labor to be provided against a pre-determined allowance. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. * * * 3.3 SCHEDULE OF ALLOWANCES A. Allowance #1: Include in the base bid an allowance for the purchase and installation of. . . kitchen equipment. . . . The total dollar amount of the allowance to be included shall be $12,000.00. There is also a separate section for "Alternates," i.e., section 01230, for Hillsborough River State Park, which provides in part: SECTION 01230 – ALTERNATES * * * 1.3 DEFINITIONS Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if OWNER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. . . . . 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Renovate the existing concession building in its entirety as shown in the drawings and specified herein. (emphasis added.) At this stage of the bidding documents, the contractor/bidder is requested to provide a Base Bid/Lump Sum on the Bid Form to "[f]urnish labor, equipment,. . .to construct a new concession building," and to provide an additional and separate amount for Alternate No. 1 to "[f]urnish labor, equipment, . . . to renovate the existing concession building." On December 13, 2001, the Bureau issued "Addendum No. One (1)" (written by the architect) to the ITB on the "Hillsborough River State Park – Concession Building." The Addendum contained the following relevant sections: Specification Section 01210: Allowances Add the following new paragraph 3.3.B: ”Allowance #2: Include in the base bid an allowance for the renovations of the existing concession building; renovations shall be defined by the Owner. The total dollar amount of the allowance to be included shall be $25,000." Specification Section 01230: Alternates Modify paragraph 3.1.A. as follows: "Alternate No. 1: Renovate the existing concession building as defined by the Owner, and as provided for under Section 01210, Allowances." (emphasis added.) Each contractor was required to sign the Addendum and attach it to the bid. By definition, and pertinent here, an addendum is an additional written instruction to a contractor during the bidding process. Based on the weight of the evidence, the purpose of this Addendum was to require the contractor to include a $25,000.00 Allowance (for Allowance # 2) in the Base Bid, for the work which might be performed if the Department requested the work to be performed for Alternate No. 1, i.e., for the renovation of the existing concession building.3 (The Department's architect decided it would cost approximately $25,000.00 to renovate the existing concession building, hence Allowance # 2.) In other words, the Addendum does not have a specific dollar amount to be included for Alternate No. 1. Rather, the $25,000.00 is an Allowance for the work described as Alternate No. 1, but the amount is to be included in the Base Bid and not as a separate line item, dollar amount. But, importantly, the Addendum did not delete the potential work to be performed as described in Alternate No. 1, although Mr. Bowman and others believed that the Addendum deleted Alternate No. 1. It deleted the necessity to place a specific dollar amount on the Bid Form for Alternate No. 1. (Mr. Bowman is a registered Professional Engineer and a licensed contractor. He has worked for the Department for 15 years and has served as Bureau Chief for two years. He supervises the contract section and the design section, which was responsible for preparing the technical plans and specifications and bidding out the job.) Mr. Bowman offered the following explanation why he believed the Addendum was confusing: Okay. I think the confusion that was created, you know, I think the addendum in itself, you know, said add $25,000 to the base bid, but then on the bid form, it still had the space down there for alternate number one, which alternate number one, which alternate number one had become $25,000 that was to be allowed for the concession building, and I think that's where the confusion came in because I think they were still confused, that they weren't really sure that they should not put that 25 down there but they knew they had been told in the addendum to do it and I think that's the reason for the notes and we got to the correspondence on the bid form, was they wanted to make sure that that's what we were wanting to do. And I think that's where the confusion came in. Like I said, it's always, if you could go back and do it again, it would be much wiser just to issue a whole new bid form and then we wouldn't be here today. But, we didn't do that. Okay. So, that's why we are here. The language in this Addendum, when read with the original Bid Specifications, apparently caused confusion with some of the bidders on the project. Several bidders called Marvin Allen (an architect and project manager for the Department's Bureau of Design and Recreation Services) prior to the submission of the bids, to clarify how the $25,000.00 Allowance should be shown on the Bid Form. (Mr. Allen did not author any of the specifications, including the Addendum.) He was listed as a contact person. He did not contact any bidders. But, Mr. Allen recalled telling each bidder who asked that the Allowance of $25,000.00 should be included in the Base Bid. But, he does not recall the names or numbers of the bidders who called, "possibly" three, four or five. Mr. Allen believed the Addendum was clear. According to Mr. Allen, the bidders who called him found the Addendum confusing. The oral responses to the bidders can be construed as interpretations of the Addendum. However, pursuant to Section B- 10 of the Specifications, any such interpretations were required to "be in the form of written Addenda to the bidding documents." Also, any such questions should have been in writing. If Section B-10 were complied with, all bidders would have been potentially on the same footing, or, at the very least, would have had access to a written clarifying document. Opening of the Bids On December 18, 2001, the bids were opened by Mike Renard, Contracts Manager with the Bureau of Design and Recreation Services, and Susan Maynard, Administrative Assistant. Mr. Dwight Fitzpatrick, a representative of All America, also attended the bid opening. The Bid Form submitted by Nelco showed a Base Bid of $355,478.00 (Lump Sum $355,478.00), and also showed an amount of $25,000.00 on the Alternate # 1 line (Add Amt. $25,000.00). See Finding of Fact 6. (It was clear to Mr. Renard that the $25,000.00 should have been included on Nelco's Base Bid. But Mr. Renard believed that Nelco submitted a responsive bid because the Department only accepted the Base Bid. Mr. Bowman agreed.) Nelco was the only one of five bidders to have a dollar amount in the Alternate #1 line under "Add Amt. $ ." All America submitted the second lowest Base Bid of $362,000.00. There was also a hand-written note on the All- America Bid Form that stated: "Addenda # 1 instruction to place $25,000 allowance in both Base Bid and as alternate # 1." Another hand written note was located below the "Add Amt. $-0-" line: "amount added in Base Bid with $25,000 allowance per Marvin Allen." The Department considered All America's bid responsive. It is a fair inference that three out of five of the other Bid Forms contained language indicating that the bidders were relying on Addendum No. One by placing the $25,000.00 Allowance in the Base Bid.4 It is uncertain whether they did so in light of the instructions of Mr. Allen concerning how to complete the Bids Forms. However, given the nature of the calls to Mr. Allen, there is a reasonable inference that there was some confusion among some of the bidders. The Department determined that Nelco submitted the lowest Base Bid, but the Department's staff had a question as to whether Nelco had included the $25,000.00 in its Base Bid. After conferring with his superiors, Mr. Renard was instructed to call Nelco to make certain that its Base Bid included the Allowance amount ($25,000.00). Mr. Renard spoke with Steve Cleveland, Nelco's Project Manager, "to verify the fact that [Nelco] had the allowance in their base bid." Mr. Cleveland orally confirmed that Nelco's Base Bid included the $25,000.00 Allowance. Mr. Renard asked Mr. Cleveland to send him a letter verifying this statement. Mr. Renard viewed this inquiry as a request for clarification or verification, not an opportunity for Nelco to modify its bid. Mr. Bowman agreed. (Mr. Renard did not believe Addendum No. 1 was confusing.) In a letter dated December 20, 2001, Mr. Cleveland confirmed that Nelco’s Base Bid of $355,478.00 included the Allowance amount and that Nelco could still perform the contract if the $25,000 Allowance was removed from its Base Bid pursuant to the ITB, i.e., that Nelco would perform the contract for $355,478.00 less $25,000.00, or $330,478.00, if the Department did not accept Alternate # 1 and the Allowance. (An alternate does not have to be accepted by the Department.) According to Mr. Renard, Mr. Cleveland never mentioned modifying, changing, or altering Nelco's bid. The Department only accepted the Base Bid for each bid. Mr. Renard did not consider it unusual to call a bidder or contractor to verify information to determine whether they can or cannot perform the work at the stipulated price. He considered it common to make this inquiry. Also, it was common in Mr. Bowman's experience to call a bidder to get clarification. Mr. Renard was not aware of any statute or rule which authorizes the Department to request clarification from a bidder after the bids are opened. Mr. Renard was more familiar with the bid forms than Mr. Allen. After receiving Mr. Cleveland's letter, the Department determined that Nelco submitted the lowest Base Bid and that the $25,000.00 amount that Nelco wrote on the Bid Form Alternate # 1 line, was a minor irregularity in the bid which the Department, as the Owner, could waive pursuant to the ITB. On December 20, 2001, the Department posted the Tabulation of Bids showing the anticipated award of the contract to Nelco. At the hearing, an unsigned letter on Department letterhead was introduced, which was addressed to Nelco and stated that Nelco submitted the apparent low bid. However, Mr. Renard testified that these letters are prepared routinely, but not mailed out without his signature. Mr. Renard did not recall signing the letter or ever sending out such a letter to Nelco. On December 21, 2001, the Department received a Notice of Intent to Protest letter from Allen E. Stine, the President of All America. In his letter, Mr. Stine stated that Nelco’s bid should have been rejected for failure to follow the specified format as per Addendum No. 1, or adjusted to have the $25,000.00 amount added to their Base Bid. Bid Protests All America filed a written formal bid protest on January 4, 2001. On January 9, 2001, Cindy Otero of All America, notified Mr. Renard by letter, and stated that Mr. Stine was available for a hearing regarding the bid protest. On January 28, 2002, Mr. Renard returned All America's check for the bond, stating that it was unnecessary. Mr. Stine recounted a number of unanswered telephone calls after the first protest was filed. During one conversation, Mr. Renard recalled Mr. Stine saying to him, "You can't do this, you can't do this." After receiving the first formal protest, the Department staff consulted with legal staff and reviewed the documents and bid procedures. Based on the number of questions received concerning the Addendum and the hand-written notes on several of the bid forms, Mr. Bowman, Bureau Chief, determined that the bid documents were confusing and ambiguous. (Mr. Bowman stated that this was their first bid protest in his 15 years with the Department.) Therefore, Mr. Bowman decided that it would in the best interest of the State of Florida to reject all of the bids pursuant to the Bid Specifications. Mr. Bowman felt that the ITB should be re-written in order to make it clearer and allowing all of the bidders to re-bid the project without any confusion or ambiguity. Mr. Stine stated that his "senior estimator" told him that the bid language "could be confusing." He and his "senior estimator" had a discussion about whether the Allowance should have been placed in the Base Bid or not. At the time of submission of All America's bid, Mr. Stine was clear that the Allowance should be placed in the Base Bid, especially after calling Mr. Allen. But, his senior estimator was not so clear. In order to appease him, Mr. Stine placed the hand-written note on All America’s proposal. Mr. Stine essentially, "cleaned" up his proposal. At the hearing, Mr. Bowman testified Rule 60D-5.0071, Florida Administrative Code, see Conclusion of Law 59, does not list "confusing or ambiguous bid specifications" as one of the circumstances allowing for the rejection of all bids. However, Mr. Bowman later stated during the hearing that he believed the circumstances listed in Rule 60D-5.0071 were not the only circumstances authorizing the Department to reject all bids. Mr. Bowman testified that he believed that general confusion among the bidders caused by the ambiguous ITB constituted sufficient grounds for rejecting all bids. Mr. Bowman was advised by legal counsel that rejecting all of the bids would probably result in another bid protest by Nelco, All America, or both. Thus, the Department decided to delay addressing All American’s first protest until after posting the rejection of all bids and receiving the subsequent protests, so that all of the protests could be resolved at once in an efficient and economical manner. Notwithstanding the Department's justifications for rejecting all bids and not proceeding on All America's initial protest, the record is unclear why the Department waited several months to reject all bids. On May 13, 2002, the Department posted the rejection of all bids. On May 16, 2002, the Department received a formal written protest of the rejection of all bids filed by All America. On May 17, 2002, Jerome I. Johnson, attorney for the Department, contacted Mr. Robert A. Lash, All America's counsel at the time, concerning the resolution of All America’s formal protest. (Before the final hearing, Mr. Lash, with All America's consent, withdrew as counsel for All America.) The parties agreed to suspend formal bid protest procedures until a meeting could be held between the parties in an attempt to resolve the protests. Mr. Johnson sent a letter dated May 21, 2002, to Mr. Lash confirming this conversation. On June 26, 2002, a meeting was held among the Department staff, legal staff, and Mr. Lash and Mr. Stine, representing All America. The parties were unable to resolve the protests. At the conclusion of the meeting, the parties agreed that formal protest procedures would not be implemented until Mr. Stine could confer further with his counsel. In a letter dated July 5, 2002, Mr. Lash stated that his client wished to proceed with formal protest procedures and requested an administrative hearing on the protests. Are the Specifications and Bid Documents Ambiguous and Was There Confusion? The parties stipulated that "[t]he Addendum language was confusing," notwithstanding the testimony of several witnesses that they were not confused. The Department's determination that the bid Specifications, including the Addendum, and the Bid Form, which remained unchanged after the Addendum was issued, were confusing and ambiguous, is supported by the weight of the evidence. This is particularly true regarding the Bid Form. The Addendum required the bidder to include an Allowance of $25,000.00 in the Base Bid for work described as Alternate # 1. But the Bid Form was unchanged to reflect the Addendum changes. The Bid Form retained a line for the bidder to submit an additional amount for Alternate # 1. Further, it appears that several bidders were confused, including, Mr. Stine, who spoke with Mr. Allen and requested and received clarification. Further, it is unclear whether all of the bidders, including Nelco, were aware of the oral interpretations or clarifications of the Addendum rendered to some of the bidders. Rejection of All Bids Based upon the foregoing, given the standard of review in this proceeding discussed in the Conclusions of Law, the weight of the evidence indicates that the Department's action, in rejecting all bids, was not illegal, arbitrary, dishonest, or fraudulent. The Department's staff was well-intended and made some mistakes along the way, e.g., by not changing the Bid Form, which they readily admit. But there was a rationale for rejecting all bids under the circumstances.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department issue a final order dismissing All America’s Petition to Prevent Rejection of Bids and Award Contract to Petitioner and denying All America's request for attorney’s fees and costs. DONE AND ENTERED this 24th day of September 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September 2002.

Florida Laws (3) 120.569120.57120.595
# 8
GUIDING LIGHT ENTERPRISE, INC. vs DEPARTMENT OF TRANSPORTATION, 04-002163BID (2004)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Jun. 21, 2004 Number: 04-002163BID Latest Update: Sep. 17, 2004

The Issue The issue in this case is whether the Department of Transportation's proposed award of a contract to Daniels Janitorial Service is contrary to the agency's governing statutes, the agency's rules or policies, or the specifications of the Invitation to Bid (ITB).

Findings Of Fact In April 2004, DOT issued ITB-DOT-04/05-5002-PDW (the ITB) seeking to contract for janitorial services at two state office buildings in DeLand, Florida. The ITB included a "bid blank," upon which vendors were directed to submit their cost proposals. The bid blank was titled "MONTHLY JANITORIAL SERVICES PER SCOPE OF SERVICES." The bid blank included three spaces where each bidder was to provide cost information. The three spaces were titled as follows: "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and "TOTAL YEARLY AMOUNT BOTH BUILDINGS." In response to the ITB, DOT received 18 bids. The bids were opened at 3:00 p.m. on April 29, 2004. The lowest bid was $5,185.76, submitted by Daniels Janitorial Service, including: $4,895.76 for "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," $200.00 for "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and $5,186.76 identified as "TOTAL YEARLY AMOUNT BOTH BUILDINGS." The second lowest bid was $10,686.00, submitted by Jan-Pro Cleaning Systems, including: $9,971.00 for "MONTHLY CLEANING - BUILDING 5000 - X 12 MONTHS," $715.00 for "MONTHLY CLEANING - BUILDING 5001 - X 12 MONTHS," and $10, 686.00 identified as "TOTAL YEARLY AMOUNT BOTH BUILDINGS." The third lowest bid was $67,777.77, submitted by the Petitioner. The remainder of the bids ranged between $69,600.00 to as much as $201,464.64. At the time of the opening, Diane Warnock, a DOT District Contract Specialist and Purchasing Agent in charge of the bid opening, observed that two of the bids (the Daniels Janitorial Service and the Jan-Pro Cleaning Systems bids) appeared to be very low in relation to the other bids. Ms. Warnock believed that the two lowest bids submitted were likely set forth on a monthly basis rather than annual amount, and that the bidders had failed to extend the monthly charges to an annual cost. Ms. Warnock contacted David Callaway, a DOT Procurement Analyst with statewide contract responsibilities, to discuss her observations. Mr. Callaway advised Ms. Warnock that she could contact the two low bidders and ascertain whether the bids submitted reflected a monthly or an annual cost. Ms. Warnock separately contacted each of the individuals responsible for submitting the low bids and inquired as to whether the bids reflected a monthly cost or an annual cost. Ms. Warnock learned that each vendor had submitted a monthly bid amount. Ms. Warnock multiplied the monthly amounts submitted by the two vendors by 12 to arrive at an annual cost. On the bid tabulation form, Ms. Warnock included the bid amount submitted by each bidder. For the two bidders who submitted monthly cost information, Ms. Warnock included the monthly costs submitted and the annual cost figures she had calculated. Based on annual costs, the lowest vendor was Daniels Janitorial Service with an annual bid amount of $62,229.12. Section 13.2 of the ITB provides as follows: 13.2 RESPONSIVENESS OF BIDS Bids will not be considered if not received by the Department on or before the date and time specified as the due date for submission. All bids must be typed or printed in ink. A responsive bid is an offer to perform the scope of services called for in this Invitation to Bid in accordance with all requirements of this Invitation to Bid. Bids found to be non- responsive will not be considered. Bids may be rejected if found to be irregular or not in conformance with the requirements and instructions herein contained. A bid may be found to be irregular or non-responsive by reasons that include, but are not limited to, failure to utilize or complete prescribed forms, modifying the bid requirements, submitting conditional bids or incomplete bids, submitting indefinite or ambiguous bids, or executing forms or the bid sheet with improper and/or undated signatures. Section 13.4 of the ITB provides as follows: 13.4 WAIVERS The Department may waive minor informalities or irregularities in bids received where such is merely a matter of form and not substance, and the correction or waiver of which is not prejudicial to other bidders. Minor irregularities are defined as those that do not have an adverse effect on the Department's interest and does not effect the price of the bid by giving a bidder an advantage or benefit not enjoyed by other bidders.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Transportation enter a final order awarding the contract for ITB-DOT-04/05- 5002-PDW to Daniels Janitorial Service. DONE AND ENTERED this 25th day of August, 2004, in Tallahassee, Leon County, Florida. WILLIAM F. QUATTLEBAUM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of August, 2004. COPIES FURNISHED: C. Denise Johnson, Esquire Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0450 Anthony Payne 1031 Eagles Forrest Drive Apopka, Florida 32712 James C. Myers, Clerk of Agency Proceedings Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Stop 58 Tallahassee, Florida 32399-0450 Pamela Leslie, General Counsel Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Stop 58 Tallahassee, Florida 32399-0450

Florida Laws (1) 120.57
# 9
POWER SWEEPING SERVICE, INC. vs DEPARTMENT OF TRANSPORTATION, 91-007592BID (1991)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Nov. 26, 1991 Number: 91-007592BID Latest Update: May 01, 1992

Findings Of Fact By Joint Prehearing Stipulation filed at the time of hearing, the parties agree that bids for contract No. E-4450, the contract in issue here, were opened by the Respondent in Fort Lauderdale on October 11, 1991. Bids were received from five bidders including the Petitioner, Power, and the low bidder, Certified. Based on its evaluation of the bids submitted, on October 18, 1991, Respondent posted an intent to award the contract to Power Sweeping Services, Inc., Petitioner herein. However, thereafter, on October 22, 1991, the Department received a formal protest from the low bidder, Certified, challenging the intent to award. After review of the substance of Certified's protest, Respondent notified all bidders that it would be reposting its intent to award on November 5, 1991, and on that date, did repost, indicating an intent to award the contract in question to Certified, the low bidder. Thereafter, on November 14, 1991, Petitioner timely filed its formal protest, having filed its initial intent to protest on November 6, 1991. The bid blank, which was issued to all prospective bidders at the pre- bid conference held in this matter for a contract to involve mechanical sweeping on Interstate Highway 595 from its eastern terminus to Southwest 136th Avenue, including interchange ramps at I-95, I-595, and State Road 84, contained as a part thereof a notice to contractors which, at page 1 of 4, (page 1 of the 36 page bid package), contained a notation that for contracts of $150,000.00 or less, the bidder would be required to submit, as proof of ability to acquire a performance and payments bond: a notarized letter from a bonding company, bank or other financial institution stating they intend to issue a performance and payment bond in the amount of your bid, should your firm be awarded the project; in lieu of a notarized letter the following may be substituted: a bid guarantee of five percent (5%); or a copy of the contractor's certificate of qualification issued by the Department. This note specifically states that "failure to provide the following required evidence of bonding", as indicated above, with the bid proposal would result in rejection of the contractor's bid. Petitioner submitted a notarized "letter of commitment to issue bond" dated October 8, 1991, by Burton Harris, attorney in fact and resident agent for American Bonding Company. Certified submitted with its bid an un-notarized letter from Mark A. Latini, bond manager with Bonina - McCutchen - Bradshaw Insurance to the effect that "Amwest Surety Insurance Company is the surety for the above referenced contractor and stands ready to provide the necessary performance and payment bond for the referenced bid should CPM be low and awarded the referenced contract." Five bidders submitted bids. Certified was the low bidder with a bid price of $61,474.85. Florida Sweeping, Incorporated was second low bidder with a bid of $67,388.16, but that bid was rejected because an addendum was not noted. Petitioner was third lowest bidder with a bid of $72,290.65. Because Certified's bid as initially submitted did not contain the required notarized letter from the bonding company, its bid was initially rejected. Thereafter, however, Certified's president, Mr. Hanousek, who prepared Certified's bid, and who attended the pre-bid meeting, called the Department's District office the day the bids were opened and was informed that his company's bid was low, but was rejected because its bond commitment letter was not notarized. As a result, he submitted a notice of protest and a subsequent protest to the denial of Certified's bid. A hearing on Certified's protest was not held. When Joseph Yesbeck, the District's director of planning and programs, who was at the time serving as acting district secretary in the absence of the appointed secretary, was contacted by Mr. Hanousek. He reviewed the file and met with Ms. Martin, the District's contract administrator for construction and maintenance contracts and the contracting staff to see what was happening. At that point Ms. Martin explained why Certified's bid had been disqualified, and the matter was thereafter discussed with the District and Department attorneys. When the District secretary came back, Mr. Yesbeck briefed him and recommended that based on the information he had received from the District and Department attorneys, the failure to submit the notarized letter should be considered a non-material deviation and the Certified bid be determined the low responsive bidder. The reasons for this were that the absence of the notary did not really give any competitive advantage to Certified and that ordinarily defects of this nature are routinely allowed to be cured. When the District secretary, on the basis of the information provided by Mr. Yesbeck, decided to repost the contract, Mr. Yesbeck prepared a joint letter of reposting which removed Certified's disqualification and left it as the low bidder. None of the other rejected bidders, including Florida Sweeping and bidder Number 5, which was rejected because its bond proposal was not of a proper character, were advised that they could come in and correct the defects with their bond letters. According to Ms. Martin, the notice to contractors requiring a notarized letter from a bonding company as an alternative to the requirement to post a 5% bid guarantee was designed to promote participation in state contracting by small business and minority business enterprise applicants, so that the bidder does not actually have to post the bond in question. The notarization requirement was put in by the Department but neither Ms. Martin nor any other witness testifying on behalf of the Department was able to indicate why the bond certification had to be notarized. Historically, when the Department has gotten a bid without a notarized bond letter it has been rejected, and in Ms. Martin's experience, she has never known of a protest based on such a denial since she began working with contracts in July, 1988. When she reviews the bids, she reviews the bonding letter for its content as well as seeing whether it is notarized. Here, her reason for initially rejecting certified's bid was solely that the bond commitment letter was not notarized. The decision to reject was not hers alone, however, since she also checked with the District General Counsel who initially advised her that Certified's bond commitment letter was no good. Apparently, counsel changed his position upon discussion of the matter with Mr. Yesbeck and the Department's General Counsel since, according to Mr. Yesbeck, both counsel recommended subsequently that the absence of the notarization not be a disqualification. Further, according to Ms. Martin the requirement for the notarization has been utilized by District 4 since 1987 with all bids requiring it notwithstanding Mr. Hanousek's testimony that he has never seen the requirement before in any of the 6 successful contract's he has had with the Department before. In that regard, however, he admits this is the only contract he has had with District 4. Ms. Martin does not know if the notarization requirement is used in other Districts and no evidence as presented by any party to clarify that issue.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law it is, therefore: RECOMMENDED that a Final Order be entered setting aside the determination that Certified Property Maintenance's bid on Contract No. E4450, Job No. 869069108 was the low responsive bid. RECOMMENDED in Tallahassee, Florida this 28th day of January, 1992. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of January, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 91-7592BID The following constitute my ruling on all Proposed Findings of Fact pursuant to Section 120.59(2), Florida Statutes submitted by the parties hereto. FOR THE PETITIONER: None submitted. FOR THE RESPONDENT: 1. & 2. Accepted and incorporated herein. Accepted and incorporated herein except for the finding that Certified's bid complied in every respect except the notarization. The assurance by the bonding company was not unqualified but conditioned upon Certified being awarded the contract. Accepted and incorporated herein. & 6. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein except for last sentence regarding which see 3., supra. Accepted and incorporated herein. FOR THE INTERVENOR: None submitted. COPIES FURNISHED: Bruce M. Cease, Esquire 2720 West Flagler Street Miami, Florida 33135 Susan P. Stephens, Esquire Department of Transportation 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0458 Ray Hanousek President Certified Property Maintenance 3203 Robbins Road Pompano Beach, Florida 33062 Ben G. Watts Secretary Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0458 Thornton J. Williams General Counsel Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0458

Florida Laws (3) 120.53120.57337.11
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer