Findings Of Fact On September 23, 1983, Hollywood submitted a permit application to DNR for construction of the proposed project which is the subject matter of this proceeding. DNR designated that permit application as Permit Application 50-41. The proposed project is actually the first phase of a two-phase project, Phase II of which has already been permitted by DNR. Phase I, which is the subject of Permit Application 50-41, consists of an extension of existing Surf Road in the City of Hollywood, an extension of an existing asphalt boardwalk, construction of a parking area with landscaped island, swale, and associated lighting. The excavated fill removed from the site of Phase I is to be used in the construction of a dune which is encompassed within Phase II of the project. The properties on which Phase I and Phase II are to be constructed are owned by the City of Hollywood and are located seaward of the Coastal Construction Control Line and landward of the Erosion Control Line. The Summit Condominium is a condominium development located west of South Surf Road in the City of Hollywood, and is directly adjacent and contiguous to the property upon which the aforementioned project is to be constructed. Petitioner is the builder and developer of the Summit Condominium and, in addition, is the fee simple owner of approximately 15 units in that development. Phase I of the proposed project, which is the permit application at issue in this proceeding, provides for the construction of a 121-space public parking area which will be approximately 62 feet wide and 605 feet long, and will extend approximately 95 feet seaward of the Coastal Construction Control Line. The parking lot will be constructed with a six-inch limerock base over a six-inch crushed limerock subbase, and will be surfaced with a one and one-half- inch asphalt wearing course. The parking lot is designed with a definite landward slope, so that stormwater will sheet flow across the parking lot away from the dune system. There is no evidence of record in this proceeding which would in any way justify a conclusion that stormwater runoff from the parking lot area will have any adverse effect on the dune system seaward of the lot. Stormwater runoff once it has left the parking lot surface will be collected in a swale and drainage ditch system located landward of the paved parking lot surface. The drainage ditch will be composed of sandy material presently located on the site and is designed on a 1.2 to 1 slope. In addition, Wedelia is to be planted in and around the drainage ditch system in order to stabilize the slopes of the ditch. The ditch and swale system is designed to allow most stormwater runoff to percolate into the soil, with any excess being collected in the ditch itself and transmitted in a northerly direction. A drainage calculation study prepared in conjunction with this proceeding demonstrates that the drainage capacity for the proposed ditch meets minimum standards contained in the South Florida Building Code, as applied by the City of Hollywood. As the ditch fills with stormwater, the water will flow in a northerly, shore parallel direction to Jefferson Street, which is located north of both the proposed project and the Summit Condominium. From Jefferson Street, runoff from the project site will flow westerly to Highway A-1-A where an existing stormwater sewer system is located. If for some reason that system proves insufficient to handle runoff, the runoff will then travel across A-1-A into the intracoastal waterway. There is no competent evidence of record in this proceeding to demonstrate that stormwater runoff from the project site will, under any conditions, flow onto Petitioner's property. Phase I of the project has been designed to minimize the potential for the creation of aerodynamically or hydrodynamically propelled missiles in the event of a major storm. The asphalt surface of the parking lot is designed to break into chunks which will settle into the sand or water when exposed to wind and water forces. The parking meters are set four feet into the ground which reduces their potential to act as missiles, but even should the beach recede to the point where the meters are installed, evidence of record in this proceeding establishes that they will fall to the base of the eroded dune wall and will be washed out to sea rather than be propelled shoreward either by water or air. Various storm surge computer models for pre- and post-construction conditions at various locations on the property were performed. The result of these models shows that there will be no difference in impact on the beach dine system and adjacent property between the pre- and postconstruction profiles in the event of a ten-year storm. Further, computer models actually showed that there will be less erosion for the post-construction profile than for the preconstruction profile in the event of a twenty-year storm surge. In the event of a fifty-year or greater storm event, the beach profile for both pre- and postconstruction in the project area would be inundated, so that the impact of such a storm will be the same with or without the proposed construction. Evidence of record does, however, establish that based upon postconstruction conditions as proposed in the permit application it would take a greater storm to erode material from the postconstruction profile, thereby establishing that the proposed project will afford greater protection than existing topography. It appears from the record in this proceeding that Hollywood's Permit Application 50-41 is complete, and that DNR has in its possession all information necessary and required by law for the processing of the permit application. Engineering plans submitted in support of the application for Phase T have been signed and sealed by a professional engineer registered in the State of Florida.
Recommendation RECOMMENDED That a Final Order be entered by the State of Florida, Department of Natural Resources, granting the requested permit. DONE AND ENTERED this 25th day of October, 1983, at Tallahassee, Florida. WILLIAM E. WILLIAMS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of October, 1983. COPIES FURNISHED: Steven L. Josias, Esquire Donald J. Dooty, Esquire 3040 East Commercial Boulevard Fort Lauderdale, Florida 33308 Deborah A. Getzoff, Esquire Assistant General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303 Leonard Lubart, Esquire Post Office Box 2207 Hollywood, Florida 33022 Elton J Gissendanner, Director Department of Natural Resources Executive Suite 3900 Commonwealth Boulevard Tallahassee, Florida 32303
Findings Of Fact The Petitioner, Dr. Jack G. Nichols, is a resident of the State of Illinois. He and his parents have, for many years, owned property on Dog island, a barrier island in Franklin County, Florida. Dr. Nichols owns Lots 107 and 108 on Dog Island, and has for many years entertained plans of building a beach house on each lot, consisting of a single-family residence for himself on Lot 108 and such a house on Lot 107 for his parents. Dr. Nichols has the habit of visiting Dog island to inspect his property on his vacations and has done so from time to time prior to April, 1984. Over the years he conceived of the general type of house he wished to build and determined prior to April, 1984 to locate the houses landward of the then-existing Coastal Construction Control Line. Pursuant to Chapter 161, Florida Statutes, the Department of Natural Resources undertook to survey and delineate a new Coastal Construction Control Line for Franklin County. The location of that line is described in Rule 16B- 26.14, F.A.C. and the new jurisdictional line became effective on April 30, 1984. Dr. Nichols came to Dog Island for his vacation in April, 1984, at which time he learned for the first time that the Department of Natural Resources had adopted the new Coastal Construction Control Line. After hearing of this new jurisdictional boundary from other property owners on the island, he sought to determine how that newly-defined boundary would affect his property and his plans for constructing a beach house. He observed aerial photographs depicting the Coastal Construction Control Line which would take effect April 30, 1984. He determined that the sites he had selected for the houses on his lots would be seaward of the new control line, as opposed to the preexisting line which he had taken into account in selecting his original home site. He also learned that if the houses he envisioned were under construction upon the effective date of the new Coastal Construction Control Line then he would be able to proceed with their construction without having to obtain a permit from the Department of Natural Resources. The Petitioner had not originally intended to construct the houses on his lots as early as April, 1984, but he became concerned that if he did not commence construction prior to the effective date of the new control line, he would not be able to place the houses at the location he had previously planned for. Thus, he took steps to retain a contractor and commence construction immediately. The Petitioner contacted Mr. William A. Shults, a contractor with experience building in the coastal areas of Franklin County. Mr. Shults was available and able to undertake construction activities and the two parties entered into a contract calling for construction of a beach house for both lots on approximately April 20, 1984. Mr. Shults immediately had necessary engineering work accomplished, had plans drafted for the structures and retained a construction crew. He cleared sufficient area on both lots to accommodate the residences and thereafter, on April 26, obtained a building permit for the structures. Materials were delivered to the island by landing craft on April 26 and 27, 1984. Mr. Shults also had a truck equipped with an auger or drilling equipment transported to the island and placed on the job site on or before April 27, 1984. The plans called for construction of the houses with a piling or pole foundation, so that the houses would be constructed above the specified flood levels. The poles and other materials necessary for construction of the foundation had all been delivered by April 27, 1984. The foundation lines were marked, the corner "batter boards" placed and other minor site preparation accomplished. The holes for the piling were to have been drilled on Saturday, April 28 but the trucks with the auger machine aboard, suffered a broken axle prior to its being positioned on Dr. Nichols' lots so that it was impossible to get the auger machine to the lots on April 28 or 29. Mr. Shults and his crew attempted to pull the truck to the site, but the difficulty of the terrain rendered that impossible. There was one other piece of auger equipment on the island, but its owner was engaged in construction activity with it at the time. That person agreed to bring his machine to the site on April 29 and begin augering and placing the poles for the pilings. His work became behind schedule however, and his machine was still involved in construction activity at his own site and could not be brought to Petitioner's site on that day. Mr. Shults, upon learning that the augering machine would not be available when needed, began commencing hand-digging of the pilings with post hole diggers on April 29. This method was a slow and laborious process because the holes had to be excavated much deeper than the length of the post-hole diggers. As a result, when the hole was dug as deep as the post-hole digger could reach from the surface of the ground, a hole had to be dug alongside the piling foundation hole so that a crew member could stand down in that hole and thus dig the piling hole deeper, handing the post-hole diggers with each load of dirt up to another crew member on the surface to dump, who would then hand the post-hole diggers back to the lower-placed crew member. This made the process of digging the foundation piling holes much slower than the use of the auger equipment. In this manner, however, Shults succeeded in digging four foundation holes on Lot 105. At that point, the augering machine arrived on the site and four piling holes were dug and the pertinent poles placed in them on Lot 107 as well. Throughout this construction process, Mr. Shults' crew was working on both foundations at one time. This allowed for less costly construction due to the efficiency of undertaking the same kind of work on two structures with the same crew at the same time. Since the two lots and construction sites adjoined each other, one crew could efficiently be used for both construction sites in an economic fashion. On April 30, Shults' construction crew proceeded to work on the structure on Lot 108 to further secure and place foundation posts. The four pilings placed in the holes on Lot 107 the day before remained in place. The construction crew and most of its equipment, and most construction work, was proceeding on Lot 108 merely because of the order of Mr. Shults to his crew to finish placing the foundation posts on that lot first, on that day. During the morning of that day, representatives of the Department arrived on the site and advised Mr. Shults that the construction activities appeared to be illegal and seaward of the Coastal Construction Control Line. They advised him that any further activity of that type would be undertaken at his and the lot owner's risk and expense. Mr. Shults thus ceased activities on both lots for a time, but during the following week, after discussing the dispute with certain Department employees, arrived at the opinion that the owner's construction activities had achieved grandfather status and that no permit from the Department would be required. He thus undertook to finish placing the foundation pilings on both lots. All the foundation pilings were installed on both lots by the end of the second week of May, 1984. Mr. Shults then contacted Dr. Nichols by telephone in Illinois informing him about the progress of the job, including the height of the piling. During this conversation Dr. Nichols became concerned that the pilings on Lot 107 did not project above the surface of the ground as far as he had anticipated, thus obstructing his view of the Gulf of Mexico from the beach house which would be constructed on top of the pilings. The view would be obstructed by the existing sand dune which Dr. Nichols had not wanted to disturb, hence locating his house in the more landward position at issue. In order to provide the desired view of the Gulf over the intervening sand dune, Dr. Nichols instructed Mr. Shults to replace the existing pilings on Lot 107 with longer ones. Mr. Shults purchased new pilings, had them delivered to the site, removed the original poles and installed the new ones in their place in the same holes, including the four holes that were dug prior to the effective date of the Coastal Construction Control Line. Dr. Nichols and Mr. Shults established that the original poles had been placed with the intention that they would be the permanent foundation for the house and no decision was contemplated nor made concerning their removal and replacement with the longer poles until after the foundation was fully constructed. In any event, by its letter of May 21, 1984, advising Dr. Nichols of the alleged violation of the Coastal Construction Control Line, the Department made a "free-form" determination that the construction activities on Lot 107 before April 30, 1984, were not sufficient to confer "grandfathered" status and that the activities were illegal unless a permit was obtained. The subject petition was filed and this proceeding ensued. It is true that Dr. Nichols' original intent was not to commence construction of the beach houses as soon as he did in April, 1984 and that he only began construction at that earlier time when he learned of the impending effective date of the new Coastal Construction Control Line which would require him to obtain a permit before constructing the houses at the sites he had previously selected. However, it is equally true that Dr. Nichols' bona fide intention when he retained Mr. Shults to commence construction was to not merely clear the site and place pilings and then construct the houses at some indefinite later time, but rather to commence construction and pursue construction activities on an ongoing, uninterrupted basis through to completion of both houses on both lots. If the Department had not intervened with its letter to the effect that the Petitioner might be in violation of the Coastal Construction Control Line, construction activities on Lot 107 would have continued to completion in an uninterrupted fashion. Prior to the effective date of the Department's Coastal Construction Control Line, the Petitioner's construction activity, involving the excavation for and placing of the foundation pilings for the residence to be on Lot 107, was undertaken and engaged in a continuous, uninterrupted fashion. The decision to remove the original pilings and replace them with longer poles was not envisioned, intended or made prior to the completion of the entire pole foundation for the house on Lot 107 in the first or second week of May. It was only at this time, when the poles were all installed, that it was determined by the owner and Mr. Shults that the original pilings were not long enough to confer a sufficient view of the Gulf from the house to be constructed on top of them. Thus, the removal of the original pilings and the replacement of them with longer poles in the same holes the original pilings had been installed in, was not an interruption in the construction activities, but was rather the correction of a deficiency in the original materials. This replacement did not involve an alteration or modification of the design, extent and type of materials of the original foundation (except to the immaterial extent that the replacement poles were round instead of square). In short, the construction activity undertaken after April 20, 1984 was a good faith effort to commence construction on the house on Lot 107 and continue it to completion in an uninterrupted fashion. The parties, Dr. Nichols and Mr. Shults, intended from the beginning to use the poles first placed in that foundation as the ultimate foundation for the structure, and did not intend merely placing those original poles, which were later removed, as a subterfuge to obtain a grandfathered status for the construction activity. The construction was landward of the Coastal Construction Control Line as it existed prior to April 30, 1984.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the Department of Natural Resources enter a Final Order determining that the structure on Lot 107, Dog Island, Franklin County, Florida is not in violation of the Department of Natural Resources permitting authority. DONE and ENTERED this 25th day of September, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1985.
The Issue Whether the Petitioners, and each of them, have standing to bring the instant action before the Division of Administrative Hearings. Whether the 5500 North Corporation has meets the requirements set forth in Section 161.053, Florida Statutes, and Rule 16B-33, Florida Administrative Code, for obtaining a permit to construct a structure seaward to the coastal construction control line (CCCL).
Findings Of Fact The Department of Environmental Protection, f/k/a Department of Natural Resources, is the state agency charged with the responsibility of regulating coastal construction under Chapter 161, Florida Statutes. 5500 North Corporation (Respondent/Applicant) is the owner of the property located at 5600 North Atlantic Avenue, Cocoa Beach, Brevard County, Florida 32931. 5500 North Corporation submitted an application for a coastal construction control line (CCCL) permit to build on the vacant portion of its property, a seven (7) story building, along with required access drives and parking, as an addition to the Cocoa Beach Days Inn Hotel complex. The site of the proposed Days Inn Tower fronts on the Atlantic Ocean and is located three (3) miles south of Port Canaveral, near DNR survey monument R-16. The application and attached document were compiled and submitted to the Department of Environmental Protection by Plata Engineering, Inc., and consisted of the following documents: Application to the Department for the proposed construction of the building, consisting of three pages, front and back, six pages total. A legal description of the property, and a Warranty Deed for the property demonstrating ownership in 5500 North Corporation. Reduced certified survey of the site, showing control lines and other required information. Reduced Site Plan prepared by Plata Engineering, Inc. Section C - which is a section through the site plan, showing the dune configuration in relation to the proposed building and the construction control lines. A depiction of a section through the proposed building and some of its structural elements. Full size drawing of the proposed site. Turtle assessments form with attached lighting specifications of the manufacturer, and aerial of the site attached. Structural Design Calculations. Complete set of Building Plans, dealing with floor planning, and the structural elements of the calculations that were submitted with the structural calculations. The application was deemed complete, and on May 20, 1993, the Department issued a proposed Final Order issuing Permit Number BE-760 for the proposed structure. Standing of Petitioners Petitioner, Carole Pope, resides in the City of Rockledge, Brevard County, Florida. She is the owner of Lot 11, Block 101 of the platted subdivision known as Avon-By-The Sea which is located in unincorporated Brevard County, north of the existing north boundary of the City of Cocoa Beach. A duplex dwelling unit is located on the parcel. Petitioner occupies one unit annually during the summer. Petitioner Pope's property is not adjacent to the property where the proposed Days Inn Tower is to be located. The property is located approximately three blocks directly north of the proposed building and measures 475 feet east- west by 50 feet north-south and is bounded on the east by the Atlantic Ocean. Petitioners, Hugh and Cora Harris, own property located at Lot 13 of replat of Blocks 104 and 105, Avon-by-the Sea, in the unincorporated land of Brevard County, which borders on the City of Cocoa Beach. Petitioners' property is located across Young Avenue, and north of the property owned by 5500 North Corporation. The Harris's property contains a single family dwelling unit and is adjacent to the property were the proposed Days Inn Tower is to be located. Petitioners, Patricia A. and Eugene A. Wojewoda, own a unit at the Cocoa Beach Towers, a multi-family condominium, which is located north of the property owned by 5500 North Corporation, across Young Avenue, in the City of Cocoa Beach. The Wojewoda's unit is located on property which is adjacent to the property where the proposed Days Inn Tower is to located. Petitioners Wojewodas are Real Estate Brokers and owners of Professional Touch Realty, Inc. One of their four offices is located at 108 Young Avenue, immediately across the street and north of the subject property. Petitioners, Howard and Martha Crusey, own a unit, which they rent out, in the Cocoa Beach Towers, which is located north and adjacent to the property owned by 5500 North Corporation. Petitioners reside at 430 Johnson Avenue in Cape Canaveral, Florida. The Department sent out a notice for public comment to each of the immediate adjacent property owners. Existing Uniform and Continuous Line of Construction As part of the application process, the Department made a determination of the existing line of uniform and continuous construction. The existing line of uniform and continuous construction is a theoretical line that goes from the most seaward extent of the two adjacent structures, where adjacent structures exist, and extends north and south along the seaward edge of the structures. In the instant case, there is historical development of major habitable structures on either side of the parcel for which the proposed building is being constructed and which are co-terminus with the prior CCCL. The footprint of the proposed Days Inn Tower does not extend seaward of the existing uniform and continuous line of construction, although a new structure (Discovery Beach) north of the Cocoa Beach Towers has been constructed landward of the current CCCL. The existing structures, which form the existing line of uniform and continuous construction, have not been unduly affected by erosion. The property was purchased by 5500 North Corporation in 1988. The property was commercially developed with the existing hotel buildings between 1959 and 1962, and the site has been operated as a hotel since that time. The footprint of the building was set by the engineers based on the parking requirements of the City of Cocoa Beach, and environmental concerns. It was determined that if the parking were located on the seaward side of the building, there would be drainage problems, and the need for a storm water treatment system for the parking lot. With the parking lot located landward of the proposed building, there will be no drain off to the side areas, but rather drain off would be to the middle of the property where the exfiltration system is located. The parking lot located landward of the proposed building meets the City of Cocoa Beach parking requirements and the drainage requirements. When siting the footprint of the proposed building, the engineers also took into consideration the fact that if the parking were located on the seaward side of the proposed building, the headlights would shine out to the beach and possibly impact sea turtles nesting. The applicants stated that construction seaward of the control line or 50-foot setback is considered necessary for reasonable use of the property, for the following reasons: The proposed building is basically an addition to a completion of the original concept of the overall hotel complex that was never completed in the past due to either financial or room availability need. The proposed placement seaward of the CCCL can be attributed to the configuration of the existing on-site buildings and the require- ment to satisfy the City of Cocoa Beach's extensive parking and limited access point requirements that have been subjected to this proposed site development. Please note that the proposed building is not being placed seaward of the existing line of continuous construction that has been established by the adjacent buildings to the north and the south. The Department determines necessity based upon the impacts the proposed structure will have on the active beach, and the dune system, and the neighborhood properties including the subject property, how the property is zoned, and whether it is situated behind the existing continuous line of construction. It is the Department's opinion that if the proposed building is in compliance with the standards established in Chapter 16B-33, F.A.C., the necessity of the proposed building has been justified. Impacts to the Beach-Dune System The greater weight of evidence supports the conclusion that the shoreline fronting the site of the proposed Days Inn Tower is stable. This section of the coastline has historically been accretional, and still continues to be accretional. There exists adequate evidence of current littoral trends. There exists accepted methodologies for determining evidence of expected wind, wave, hydrostatic and hydrodynamic forces associated with the design storm event which was presented in 5500 North Corporation's application for CCCL permit. Based on the 1989 Brevard County Study conducted by Olsen and Associates, Inc., there is no erosion at the location of the proposed building, instead the shoreline is prograding seaward instead of landward. Therefore, the shoreline is at least stable or accretional. Based on its in-house analysis, the Department of Environmental Protection conservatively adopted an erosion rate of one foot per year, which is considered a relatively minor erosion rate. Based on the Department of Environmental Protection's projection of the erosion for the area being one foot per year, the location of the proposed building lies well in excess of 200 feet landward of the thirty-year seasonal high water line. Although the proposed structure extends 118 feet seaward of the CCCL, the setback of the proposed building from the existing dune line is significant; therefore, there was no evidence of a threat of impact on the beach, to the beach or dune system as a result of the construction at the specific site. There are existing devices (i.e., an existing fence on the property which funnels people into boardwalks so that people cannot walk uncontrolled on the beach dune system) implemented in Brevard County and specifically on the site which will help manage people impacts as well. The setback between the dune and the proposed construction qualitatively relates to the ability of the site to recover after a one-hundred year storm. If a structure is located too far seaward, either immediately adjacent to or on top of the dune, it would inhibit the natural storm recovery process. The proposed building is set a significant distance landward of the dune formation itself, so there will be adequate room for the dune to recover in the future should there be a one-hundred year storm event. The proposed structure is located at a sufficient distance landward of the beach-dune system to permit natural shoreline fluctuations and to preserve the dune stability and the natural recovery following storm induced erosion. The proposed construction will not have a cumulative impact that will threaten the beach or dune system or its recovery potential following a major storm event. low. Impacts to Adjacent Property Owners The probability of potential impacts to adjacent property owners is One reason the proposed building will not have adverse impacts to adjacent properties is that the proposed building is located significantly landward, and does not go further seaward than the existing line of construction. The adjacent buildings were constructed landward of the previous CCCL. The nature of the design associated with the particular project or the structural components of the design also minimize the impact to the parcel and to adjacent parcels. The first feature of the design of the proposed building is that the major habitable floors of the building are above the elevation of the one- hundred year storm and wave activity on top of the storm surge, so they will not be impacted by the water height or the wave activity of the storm. The second feature of the design of the proposed building is that everything below the habitable floors is designed to break away and lie down during any impact by wave activity, which allows the storm to go through the building rather than having those forces exerted on the building itself. The frangible driveway is designed so that the individual stones will fall as the grade falls, and most of them will end up buried in the event of a storm. The third feature of the design of the proposed building is that the building is elevated on a pile foundation which is sunk to a depth which is sufficient to accommodate for the anticipated erosion of a one-hundred year storm, and the pile caps are sunk well into the ground so that they do not contribute to erosion. Therefore, the building has been designed to withstand the one-hundred year storm, and the dynamics of the storm are allowed to go through the building and to be dissipated, in contrast to endangering the building or endangering adjacent properties. Due to the fact that the proposed building is "super-elevated and the portions that are actually impacted by the one-hundred year storm being frangible," the proposed building will not impact the adjacent properties. The proposed Days Inn Tower would serve to protect the adjacent Cocoa Beach Towers, and Petitioner Harris's property, by blocking the impact of a storm coming from the southeast. The proposed structure is designed so as to minimize any expected adverse impact on the beach dune system or adjacent properties or structures and is designed consistent with Section 16B-33.005, Florida Administrative Code. The proposed building meets the requirements of Chapter 161, Chapter 16B-33, Florida Administrative Code. Structural Design of Proposed Building The applicant provided adequate engineering data to the Department concerning the construction design of the building. The structure is designed in accordance with the minimum building code adopted for the area pursuant to Section 553.70-553.895, Florida Statutes. The proposed building is designed in accordance with the local code, and, in the opinion of the structural engineer who designed the building, either meets or exceeds the required codes. The proposed building is designed in accordance with Section 6, American National Standards/American Society of Civil Engineering 7-88 (July 1990) "Minimum Design Loads for Buildings and Other Structures", and has a minimum basic wind speed of 110 miles per hour. The proposed building is designed so that the building and its components will not become airborne missiles. The plans for the windows and doors require that they meet the 110 miles per hour wind loads. The proposed building is made of concrete reinforced masonry, and does not have bricks or attached masonry which could detach in a storm and become airborne. There are no substantial walls or partitions to be constructed below the level of the first finished floor, except for the elevator and stairs, seaward of the CCCL. The walls on the first floor are frangible walls which are designed to resist the 110 mile per hour wind pressure, but they lie down or collapse into the erosion hole created under wave surge pressure. The frangible walls are made of 4-inch thick concrete with reinforcing rods inside them, and are cut into 4 foot by 4 foot panels. The Department of Environmental Protection requires that any walls constructed below the one-hundred year storm surge plus storm wave elevations be frangible walls. The structural design considered the hydrodynamic loads which would be expected under the conditions of a one-hundred year storm event. The calculation for wave forces on building foundations and building superstructures is based on minimum criteria and methods given in professionally recognized documents accepted by the Bureau of Coastal Engineering and Regulation with the Department. The structural design considered hydrostatic loads which would be expected under the conditions of maximum water height associated with a one- hundred year storm event. The calculations for hydrostatic loads considered the maximum water pressure resulting from a fully peaked, breaking wave superimposed on the design storm surge. Both free and confined hydrostatic loads were considered in the design calculations. Hydrostatic loads which are confined were determined using the maximum elevation to which the confined water would fully rise if unconfined. Vertical hydrostatic loads were considered as forces acting both vertically downward and upward; however, there is no action upward because the maximum water level is at midlevel of the first floor and does not reach the second floor. The structural design considered the hydrodynamic loads which would be expected under the conditions of a one-hundred year storm event. The calculations for hydrodynamic loads considered the maximum water pressure resulting from the motion of the water mass associated with a one- hundred year storm event. Full intensity loading was applied on all structural surfaces above the design grade which would effect the flow velocities, which are above the first floor and are not reached by the wave surge. The proposed building is elevated on, and securely anchored to, an adequate pile foundation in such a manner as to locate the building support structure above the design breaking wave crests or wave uprush as superimposed on the storm surge with dynamic wave set up of one-hundred year storm. The piling foundation is designed to withstand anticipated erosion, scour, and loads resulting form a one-hundred year storm, including wind, wave, hydrostatic and hydrodynamic forces, and the pile caps are located below the erosion line as indicated by the Department's information and graphs. The elevation of the soil surface used in the calculation design grade is less than that which would result from the anticipated beach and dune erosion due to the one-hundred year storm event. The erosion calculations for foundation design account for all vertical and lateral erosions and scour producing forces. The pile caps are set below the design grade which includes localized scour, and are designed for the erosion of soil during the one-hundred year storm event. The piles are driven to a penetration which achieves adequate bearing capacity taking into consideration the anticipated loss of soil above the design grade, based on information provided by the geotechnical engineer's recommendation and the Department's requirements. The design plans and specifications submitted as part of the permit application for the proposed Days Inn Tower are in compliance with the standards established in Rules 16B-33, Florida Administrative Code. Turtle Impacts There is a two prong test which the proposed structure must meet to determine if the proposed building would have an adverse impact on nesting sea turtles. First, the proposed structure must not occupy marine turtle habitat, and second, the proposed structure's lighting must be adequate to eliminate adverse impacts to marine turtles. The effects of pedestrian traffic or flashlights on the beach are not considered by the Department when reviewing a permit application for adverse impacts to the marine turtles. The proposed building is sited significantly landward of the nesting beach, which is evidenced by the 75-foot wide dune stretch; therefore, it is not anticipated that the structure will result in any direct mortality of any marine turtle, nor would the building result in the degradation of the marine turtle nesting habitat. The proposed seven story structure will not occupy marine turtle habitat. The permit requirement to do dune restorative work, proposed by the Department, enhances the marine turtle habitat by further building the dune and enhancing the dune. Although the turtles do not nest beyond the dune crest, the dune is an integral part of protecting the habitat. There is a potential that the building, due to its height, could enhance marine turtle nesting habitat by blocking out the ambient glow from the City of Cocoa Beach which would create a dark beach directly in front of the proposed structure which could attract nesting. The applicant submitted a lighting plan to the Department which complied with the guidelines that are established in the information form entitled "Assessment to reduce impacts to marine turtles for lighting to reduce adverse impacts associated with coastal lighting." There are two main components of the lighting plan associated with the proposed building: the parking lot lights and the structural lighting. The parking lot lighting is designed as low-level Ballard-style lighting which is only 48 inches above the grade and emits light in a downward direction which will not be directly visible from the beach. The parking lot lighting design is the type recommended by the Department for parking lots, and is a good lighting design. The Department also recommends that an applicant plant hedges or landscape features to block out parking lights. The applicant is proposing to plant hedges in front of the 18 parking spaces that are on the seaward side of the proposed building. The structural lighting plan does have lighting on the seaward facade of the proposed building, which is not recommended by the Department, but the lights are designed to eliminate or significantly reduce the impact to marine turtles. The lights consist of canister, shielded, down-casting lights on the balconies which house a yellow bug lamp which is less impactive to turtles, and which is acceptable to the Department. The Department issued an approval letter regarding the proposed building to the project engineer which contained permit conditions for the protection of the marine turtles in association with the project. The permit conditions are as follows: No construction, operation, transportation or storage of equipment or materials is authorized seaward of the existing chain link fence located approximately 175 feet seaward of the coastal construction control line. No temporary lighting of the construction area is authorized at any time during the marine turtle nesting season (March 1 through October 31). All permanent exterior lighting shall be installed and maintained as depicted in the approved lighting schematic. No additional permanent exterior lighting is authorized. c All windows and glass doors visible from any point on the beach must be tinted to a transmittance value (light transmission form inside to outside) of 45% or less through the use of tinted glass or window film. Pursuant to the Department's requirements, the proposed construction will not have an adverse impact on nesting sea turtles, their hatchlings, or their habitat. Vegetation Impacts The vegetation patch on the dune system is approximately seventy five feet wide under today's conditions, and is probably growing to some degree. The vegetation system is basically comprised of a low-level dune which is planted both naturally and artificially with indigenous, salt-tolerant type vegetation, and sea oats. The existing line of construction which the proposed building is set behind is well landward of the zone of indigenous vegetation. Special condition #4 contained in the permit issued by the Department requires the applicant to convert some of the existing sodded area between the vegetation limits and the proposed construction to plantings with indigenous vegetation, which will serve to enhance the dune system. The native beach vegetation will be adequately protected by the permit conditions, given the location of the construction. Local Government Approvals On June 3, 1992, the Cocoa Beach Board of Adjustment granted a variance to the CCCL to the 5500 North Corporation for construction of the proposed building. Challenges to decisions of the City's Board of Adjustment is to the circuit court. In the instant case, the time for challenging the decision of the Board has expired. The City of Cocoa Beach Planning Board has the authority to approve site plans for site specific construction. The City's Planning Board has the responsibility of ensuring that the site plan conforms with the Comprehensive Plan and to recommend changes, if needed, to the City Commission. On July 13, 1992, the Cocoa Beach Planning Board voted to approve the site plan for the proposed building submitted by the 5500 North Corporation. The decision of the Planning Board granting approval of the 5500 North Corporation's site plan showed part or all of the building was seaward of the CCCL. The Petitioners did not file an appeal of the Planning Board's decision with the City Commission. Nor did they challenge the Planning Board's action in the circuit court. The 5500 North Corporation was not required to apply to the city commission for an amendment to the Cocoa Beach Comprehensive Plan in order to permit the proposed hotel tower to be located in the designated high hazard area. On July 6, 1993, the Building Official issued a building construction permit to the 5500 North Corporation for the proposed building, which has been subsequently extended for an unknown period of time. There are no other permits or local government requirements which have not been met by 5500 North Corporation. The applicant submitted written evidence to the Department from the City of Cocoa Beach, who has jurisdiction over the project, which stated that the project does not contravene local setback requirements, or zoning and building codes.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection issue Permit Number BE-760 to the 5500 North Corporation, subject to the conditions proposed in the proposed Final Order. DONE and ENTERED this 24th day of March, 1994, in Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of March, 1994. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on proposed findings of fact submitted by the parties. Petitioners' Proposed Findings of Fact Accepted in substance: paragraphs 1 (in part) 2, 3 (in part), 4, 5, 6, 7, 8 (in part), 10, 12 (in part), 13, 16 (in part), 17, 18, 19, 23 (in part), 24 (in part), 26 (in part), 27 (in part), 29 (in part), 31 (in part), 38 (in part), 49, 51, 63, 68 (in part), 69, 70, 71, 73 (in part). Rejected as against the greater weight of evidence: paragraphs 15 (in part), 16 (in part), 27 (in part), 46, 50 (in part), 82 (in part). Rejected as subsumed, argument or Conclusions of law: paragraphs 1 (in part), 14, 15 (in part), 16 (in part), 21, 23 (in part), 25, 26 (in part), 27 (in part), 28, 29 (in part), 30, 31 (in part), 32, 33, 34 (in part), 35, 36, 37 (in part), 38 (in part), 39, 40, 41, 42, 43, 44, 45, 47, 48, 50 (in part), 52, 56, 57, 58 (in part), 59 (in part), 61, 62, 64, 65, 66, 67, 68 (in part), 72 (in part), 73 (in part), 76, 77, 78, 79, 80, 81, 82 (in part), 83, 84. Rejected as irrelevant or immaterial: paragraphs 3 (in part), 5, 8 (in part), 9, 11, 12 (in part), 20, 22, 24 (in part), 34 (in part), 53, 54, 55, 58 (in part), 59 (in part), 60, 72 (in part), 74, 75. Respondent's Proposed Findings of Fact: Accepted in Substance: paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16 (in part), 17, 18, 19, 20, 22, 23, 24, 25, 27, 29, 30, 35, 36 (in part), 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 92, 93 (in part) 94, 95, 96, 97, 98, 99, 100, 101, 102, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118. Rejected as against the greater weight of evidence: paragraph 16 (in part). Rejected as subsumed, argument or irrelevant and immaterial: paragraphs 21, 26, 28, 31, 32, 33, 34, 36 (in part), 61, 87, 88, 89, 90, 91, 93 (in part), 103. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Hugh and Cora Harris (pro se) 208 Young Avenue Cocoa Beach, Florida 32931 Howard and Martha Crusey (pro se) 430 Johnson Avenue, Apartment #304 Cape Canaveral, Florida 32920 Carole Pope (pro se) 715 Rockledge Drive Rockledge, Florida 32955 Patricia and Eugene Wojewoda 830 North Atlantic Avenue Cocoa Beach, Florida 32931 Dana M. Wiehle, Esquire Assistant General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road, MS-35 Tallahassee, Florida 32399 Wilbur E. Brewton, Esquire Kelly Brewton Plante, Esquire Taylor, Brion, Buker & Greene 225 South Adams Street, Suite 250 Tallahassee, Florida 32301
Findings Of Fact Nannette K. Scoggins is the owner of the real property located at 5622 Gulf Drive, Holmes Beach, Florida in Manatee County. Nannette K. Scoggins' property, the petitioner's property, 5624 Gulf Drive, and the other adjacent property, 5620 Gulf Drive, are zoned as "A-1 Hotel-Motel" under the City of Holmes Beach Zoning Ordinance. On November 13, 1983, Mrs. Scoggins submitted to DNR an application for a permit for construction seaward of the coastal construction control line (control line). The proposed project, known as Jansea Place, would consist of two multifamily dwellings, four units to a building, divided by a swimming pool. A portion of the most seaward building would extend a maximum of 57 feet seaward of the control line. By letter dated July 11, 1984, DNR notified petitioner that the department was considering the permit application. The petitioner responded by letter dated July 18, 1984, objecting to any construction seaward of the control line. On October 1, 1984, petitioner received notification that DNR intended to recommend approval of the permit. The permit was scheduled for a vote by the Governor and Cabinet on October 16, 1984. The staff of DNR recommended approval of the permit. By telegram dated October 15, 1984, the petitioner requested an administrative hearing, and on October 22, 1984, petitioner filed a petition for a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes. The application for permit No. ME-89 is a complete application for permit to construct seaward of the coastal construction control line. On October 5, 1983, the Superintendent of Public Works of the City of Holmes Beach certified that this project does not violate any ordinance of the City of Holmes Beach. The plans for the proposed project are signed and sealed by an architect registered in the State of Florida, and the submitted plans comply with the design standards established in Rule 16B-33.07, Florida Administrative Code to resist adequately the natural forces associated with a 100-year return interval storm event. The plans, specifications, drawings and other information submitted to DNR with the application for permit to construct seaward of the coastal construction control line are complete and accurate, and meet the requirements of DNR for that purpose. Under the provisions of Rule 16B-33, Florida Administrative Code, the application was determined to be complete on August 6, 1984. The proposed construction is located landward of an existing vertical concrete bulkhead. The seawall was built jointly by the Scoggins and Mr. McLean, who owns the property immediately to the south of the Scoggins' property. The seawall was built after the hurricane of 1972 because the existing dune system had been destroyed. Since that time, the mean high water line has continued to encroach landward to the point where it is now east of the wall. However, the seawall is not necessary for the protection of the proposed building. Although the seawall would fail under the direct impact of a major hurricane, the proposed building is adequately designed to withstand the impact erosion, the wave loads, the winds, and the water forces associated with a major hurricane. The necessity and justification for the project's location in relation to the control line is stated in the application, and petitioner has not challenged the necessity or justification. The City of Holmes Beach Zoning Ordinance requires that the buildings be separated by a minimum of 30 feet. Since the proposed buildings are separated by 30 feet, the proposed seaward building is located as far landward as possible without violating the zoning ordinance. Erosion and structural damage occurred as a result of Hurricane Agnes in 1972 and the "No Name" storm in 1982 in the area between 1,000 feet south of the Scoggins' property and 500 feet north of the Scoggins' property. Although the beach was fairly stable from 1974 to 1979, the beach began to erode in 1980. When the seawall was built in 1974, the dune line was even with the seawall. However, as can be seen from a comparison of the photographs taken in June of 1979 with those taken in early 1985, the beach has eroded since June of 1979 and the dune line is now several feet landward of the seawall. The DNR recommendation for approval of the Scoggin's permit application was based upon historical erosion data for the period between 1940 and 1974, which was the most recent data available that could be used to review the project. Mr. Clark stated that the application was recommended for approval based on the design of the proposed building and its alignment with existing structures built seaward of the control line. The proposed project is located landward of a line of existing structures. Although the adjacent properties have been affected by erosion, there was no evidence presented to show that the existing structures located seaward of the control line have been unduly affected by erosion. In 1974, when the seawall was being constructed, the worker building the seawall dug up part of the petitioner's property and destroyed the sea oats he had planted. However, the proposed project has a driveway encircling the building which would provide vehicular access to the seawall if necessary. The proposed project will partially obstruct petitioner's view to the southwest. However, there was no evidence presented that petitioner's property or the other adjacent property, would be adversely affected in any other way by the proposed project. There was no evidence presented that the proposed project would be affected by, or have an effect on, beach or coastal erosion. The proposed project would have no effect on the beach dune system.
Recommendation Upon consideration of the foregoing, it is recommended that DNR issue Permit Number ME-89 to Nannette K. Scoggins. DONE and ENTERED this 28th day of June, 1985, in Tallahassee Leon County Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of June, 1985.
Findings Of Fact Petitioners, Larry C. and Jan D. Giunipero, reside at 2345 Tour Eiffel Drive, Tallahassee, Florida. On February 29, 1984, they obtained a building permit from Franklin County to construct a single-family dwelling on their lot in Alligator Point, Franklin County, Florida. The Giuniperos engaged the services of a professional engineer to design their beach house. In so doing, the engineer designed the structure so as to comply with the Federal Emergency Management Association (FEMA) guidelines, which are minimum building requirements established by the Federal Insurance Administration to qualify for federal flood insurance. These guidelines have been adopted by the Franklin County Planning and Zoning Department, and insure that the structure can withstand winds of 110 miles per hour. Even before the Guiniperos obtained their permit, respondent, Department of Natural Resources (DNR), was in the process of adopting new Rule 16B-26.14, Florida Administrative Code, which would establish a coastal construction line for Franklin County. Under the proposed rule, a coastal construction control line on Alligator Point would be established, and any excavation or construction activities thereafter on property seaward of the control line would require a permit from DNR, and have to be in conformity with all structural requirements set forth in Rule 168-33.07, Florida Administrative Code. Because the Guiniperos' lot lies on the seaward side of the control line, they were obviously affected by the rule. The rule adoption process was quite lengthy and well publicized. It began in October, 1983 when a public workshop was held in Apalachicola and aerial displays of the control line were placed in the courthouse. Further public hearings were held in Tallahassee in February, March and April, 1984. These hearings were the subject of numerous notices and advertisements in the Florida Administrative Weekly, Tallahassee Democrat, Apalachicola Times, Panama City News Herald, and Franklin County News. Clearly, the agency met all legal requirements in advertising the rule. However, for some reason, neither the Giuniperos or their professional engineer were aware of the pending rule change. Similarly, the Franklin County planner failed to advise them of the imminent rule change even though aerial displays of the proposed line were in the courthouse when the permit was issued. Rule 168-26.14, Florida Administrative Code, was adopted by the Florida Cabinet on April 5, 1984, and eventually became effective on April 30, 1984. As of that date, any construction or excavation work seaward of the control line required DNR to issue a permit unless a dwelling was already "under construction" in which case the project was grandfathered in. The parties agree that petitioners do not fall in this category since the dwelling was not "under construction" within the meaning of DNR rules. A few days before the rule became effective, a DNR engineer met with the Franklin County planner to review all building permits issued since September, 1983 for construction on the seaward side of the control line. The engineer did this so that he could inspect all building sites after the line became effective and determine which, if any, were "under construction" and therefore exempt from DNR permitting requirements. Because of the volume of permits issued to persons seeking to beat the April 30 deadline, and his unfamiliarity with alligator Point, the planner was unable to give the DNR engineer the precise location of petitioners' lot. On or about May 1, 1984, the engineer visited the general locale of petitioners' lot. There was no activity on petitioners' lot, and no permit posted on the site. Accordingly, he assumed a recently completed beach house some 300 feet east of petitioners' lot was actually the Giuniperos' house. Since it was already completed, he merely filed a report the following day indicating that "if the location referenced above is accurate, the structure appeared to be completed at that time." On July 6, 1984, petitioners proceeded to install twenty-three 8" by 8" pilings on their lot at a cost of $1,760. DNR discovered this construction activity a few days later and notified petitioners by telephone that such activity was illegal without a permit. A formal cease and desist order was sent on July 11, 1984, and no activity has taken place since that time. An application for a permit remains in abeyance pending the outcome of this proceeding. The structural requirements of DNR are more stringent than those previously required by Franklin County and FEMA. Indeed, the FEMA guidelines are not a part of a coastal construction regulatory program but are merely minimum standards to meet federal flood insurance criteria. Therefore, while the Guiniperos' proposed dwelling is designed to withstand a windload of 110 miles per hour DNR requires a structure to meet a windload of 140 miles per hour. DNR also recommends that larger and more expensive pilings be used, and that the structure be designed to adequately resist a 100 year return interval storm event. Because the DNR requirements are more stringent, petitioners estimate they will incur total costs of $8,890 just to pull out the old pilings and install larger ones. 1/ Additional costs may be incurred to redesign and build the structure to withstand a wind velocity of 140 miles per hour. By rule, DNR does not grant a waiver of its permit requirements except where a building is already constructed and an applicant desires to make "minor additions" to existing nonconforming structures. The Giuniperos do not qualify for such a waiver.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that petitioners' request for a waiver from the permitting requirements of Rule 16B-33.07 be DENIED. DONE and ORDERED this 11th day of March, 1985, in Tallahassee, Florida. Hearings Hearings DONALD R. ALEXANDER Hearing Officer Division of Administrative The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative this 11th day of March, 1985.
The Issue Petitioners challenged the Department of Environmental Protection's (Department) preliminary Final Order, alleging that Petitioners committed the "unauthorized clearing and destruction of dunes and dune vegetation for the purposes of constructing a roadway seaward of the coastal construction control line [(CCCL)] without benefit of a permit." The ultimate issue is whether the work Petitioners performed was seaward of the CCCL, and if it was, whether there was a violation of Amended Permit FR-563 and Section 161.053(2), Florida Statutes.
Findings Of Fact Parties Petitioner, Ben Withers, Inc., is a Florida corporation doing business in the State of Florida. Petitioner, Ben Withers, is the President and owner of Ben Withers, Inc., and a resident of Panacea, Florida. (Henceforth, Ben Withers and Ben Withers, Inc., are referred to collectively as "Mr. Withers," unless otherwise noted.) Mr. Withers is a licensed general contractor. The Department is the executive agency of the State of Florida operating pursuant to, among others, Chapter 161, Florida Statutes, and Chapter 62, Florida Administrative Code. Pursuant to Chapter 161, Florida Statutes, the Department administers the CCCL program for construction activities seaward of the CCCL. Coastal Construction Control Line Program The Department's Bureau of Beaches and Wetland Resources regulates construction and excavation activities seaward of the CCCL. The Department is responsible for determining and setting the CCCLs. The CCCL is a scientifically established line pursuant to Section 161.053, Florida Statutes. By definition, the CCCL "defines that portion of the beach-dune system subject to severe fluctuations based on a one-hundred-year storm surge, storm waves, or other predictable weather conditions." Rule 62B-33.002(13), Florida Administrative Code. Construction and excavation activity seaward of the CCCL is regulated by Section 161.053, Florida Statutes, and Rule 62B- 33, Florida Administrative Code. Mr. Withers admitted that he is aware of Department rules regarding beaches and coastal construction and is also aware that excavation seaward of the CCCL requires a permit unless it is otherwise exempt, and that he had this knowledge prior to the present case. Accessing the Pepper Project Site Under Amended Permit FR-563 Dog Island is a barrier island south of and about three miles off the coast of Franklin County, Florida. The island is approximately eight miles in length. There is no bridge to the island. The Pepper project site is on the far western end of the island. The Gulf of Mexico borders the island on the south and St. George Sound borders the island to the north. The most common way to access the Pepper site with any vehicle carrying equipment and materials, would be to use a boat or barge to a marina area (Tyson's Harbor) near the center of the island, or a private dock, and then traverse west down the middle of the island or down the beach itself, or a combination of the two. The Easy Street Easement is an easement area for a roadway running east and west through Dog Island. The parties agree that Easy Street and the Easy Street Easement are the same. The Easy Street Easement had been an unpaved roadway years before; part of the roadway was still visible in May 2001, and other parts had been covered with vegetation. There are portions of Easy Street and Easy Way east of the cul-de-sac which are visible roadways. See, e.g., Department Exhibit 13. Additionally, parts of Easy Street are seaward of the Department's CCCL (e.g., in the narrows area which is west of the cul-de-sac) and other parts are landward of the CCCL. See, e.g., Finding of Fact 29. Pursuant to its statutory duty, in 1996, the Department set the reference monuments R-158-R-160 for the CCCL on the west end of Dog Island. These monuments are in the narrows area of the island and run west to east. The CCCL is not visible on the ground. A surveyor is needed to locate the line. The alleged violation in this case was committed between R-158 and R-160, part of the narrows area. The Easy Street Easement on Dog Island runs both north and south from The Nature Conservancy cul-de-sac and then runs westerly to the west end of Dog Island. The CCCL Permits On October 21, 1999, the Department issued Permit FR-563 to Leonard Pepper, the property owner, for the construction of a single–family dwelling and for structures associated with the dwelling on the west end of Dog Island. Permit FR-563 contained Standard Permit Conditions that required in part: (1)(a) all construction or activity for which the permit was granted be carried out in accordance with the plans and specifications which were approved by the Department as a part of the permit; (1)(b) all construction or activity authorized under the permit shall be conducted using extreme care to prevent any adverse impacts to the beach and dune system; and (1)(g) existing beach and dune topography and vegetation shall not be disturbed except as expressly authorized in the permit. Permit FR-563 did not authorize the start of construction until a construction access plan to the Pepper project site was approved, in order to minimize impacts to the beach and dune system. On October 16, 2000, Amended Permit FR-563 was issued with a Notice to Proceed Withheld. The Amended Permit also contained Special Condition 1.5 which required the submittal and approval of "[a] construction access plan showing the route and timing for bringing equipment and materials to the site, in order to minimize impacts to the beach and dune system." The Department was concerned about the manner in which equipment and materials would be brought to the project site without causing further harm to the system. Amended Permit FR-563 did not expressly or implicitly authorize excavation or grading seaward of the CCCL in any area on Dog Island off of the project site and footprint of the house. In late 2000, Mr. Withers became involved with the Pepper project after Amended Permit FR-563 (with the Notice to Proceed Withheld) was issued on October 16, 2000. Part of Mr. Withers' job responsibility was to prepare and submit a construction access plan to the Department for approval. The Department does not normally require an access plan because most job sites are located in areas with established roads for ingress and egress. Here, there was no established road to and from the project site. The access plan was necessary in order to determine how Mr. Withers would transport equipment and materials to the Pepper project site on the west end of Dog Island due to the site's remote location and the absence of an established roadway to the site. Mr. Withers expected that materials and heavy equipment, including cranes, would be off-loaded at Tyson's Harbor, located approximately in the middle of Dog Island, and transported by vehicle to the project site along the access plan route. He expected to only transport pilings using the beach access route. On March 15, 2001, Mr. Withers submitted an access plan which described the route Mr. Withers would traverse by vehicle with construction equipment and materials. See Endnote 1. The Easy Street Easement starts at the east end of the island as an established roadway. Proceeding in a westerly direction, Easy Street comes to a dead-end at a cul-de-sac landward of the CCCL. The access plan authorized Mr. Withers to access the job site using part the Easy Street/Easy Street Easement (starting on the east end of the island) going north from The Nature Conservancy cul-de-sac, then heading in a westerly direction just south of the Ausley house (west of R-158 and just landward of the CCCL) and across the narrows area and continuing in a westerly direction along the northern shoreline and in southerly direction toward R-154. The access plan then authorized Mr. Withers to proceed in a westerly direction over the middle portion of the west-end of the island, then in a southerly direction toward the project site.1 The access plan showed a route both landward and seaward of the CCCL along the narrows area. See Department Exhibit 4- orange line then blue line after the orange circle on the west-end of the island. As described by Mr. McNeal of the Department, the access route is seaward, for the most part, of the CCCL from R-157 to R- 159 (running west to east) and landward of the CCCL east of R-159. The Department described the damaged area of 5,305.6 square feet (Department Exhibit 11A, insert "B") caused by Mr. Withers as east of R-159 and seaward of the CCCL and south of the access plan route. See also Finding of Fact 35. However, it appears that a portion of Easy Street, between R-159 and R-160, is seaward of the CCCL. Compare Department Exhibit 12 with Department Exhibits 4, 11A, and 13. During a pre-hearing deposition, Mr. Withers marked in pink the route he took through a portion of the narrows area which coincides with the portion of Easy Street between the approximate locations of R-159 and R-160, depicted on Department Exhibit 12. See Finding of Fact 43. (Mr. Withers had the Easy Street Easement staked prior to doing any work on Dog Island. See Findings of Fact 33-35.) The damaged area appears to coincide with this portion of Easy Street, and seaward of the CCCL. See Department Exhibit 11A. The access plan authorized Mr. Withers to drive (vehicular traffic) his equipment over the easement following the route depicted on the access plan until he arrived at the project site. See Endnote 1. The Department expected that travel along the access route would cause minimal and temporary damage or destruction to the topography, so the plan was considered acceptable. The access plan did not authorize excavation of a roadway within the route, including the narrows area, nor did it contemplate any other activity over or around a dune other than what might occur as a result of driving.2 The Department understood that Mr. Withers would be driving daily over the access plan route to the project site. The Department assumed that trucks would be used to transport equipment and materials. The Department did not differentiate among vehicles which could be used, including large trucks. On April 11, 2001, the Department issued a Notice to Proceed to Mr. Pepper to begin construction of his single-family dwelling in accordance with Amended Permit FR-563. The access plan is part of the Amended permit. Shortly after the Notice to Proceed was issued, The Nature Conservancy advised the Department of concerns it had with the access plan. As a result, on April 24, 2001, there was a meeting in Apalachicola, Florida, convened by the Department and attended by other interested governmental entities and private persons, including Mr. Withers. The purpose of the meeting was explore other possible ways and means of access by Mr. Withers to the Pepper project site.3 No resolution was reached during the meeting and the access plan previously approved by the Department remained effective. The previously issued Notice to Proceed was also in effect. The Violations Mr. Withers hired Kenneth Greenwood of Garlick Environmental Associates to perform a threatened/endangered species inspection, plant and animal, on an approximately 30-foot wide strip on the Easy Street Easement (approximately 1,800 feet) being utilized in Mr. Withers' access plan and within the narrows area. See Department Exhibit 13-yellow markings. On May 2, 2001, Mr. Greenwood performed the inspection within the easement that Mr. Withers had staked out by a land surveyor, approximately 15 feet on either side of the stakes. He found no threatened/endangered species. (The CCCL was not staked by Mr. Withers because, according to Mr. Withers, the Department did not ask him to locate the CCCL with stakes.) The access route depicted by Mr. McNeal in orange on Department Exhibit 4, which runs east of R-159, is similar to the description of the staked areas east of R-159, described by Mr. Greenwood and marked in yellow on Department Exhibit 13. See Findings of Fact 28-29. Both areas are landward of the CCCL. However, the 5,305.6 square foot damaged area is east of R-159 and is seaward of the CCCL. Mr. Greenwood described the area where he performed his investigation as being "relatively undisturbed," "relatively stable," having no vehicle tracks, and he stated that there were areas of bare sand as well as areas of "natural beach dune vegetation." He described the area as "relatively flat with some small amounts of mounding." The pictures taken by Mr. Greenwood within the staked easement on May 2, 2001, as part of his investigation, do not depict any vehicle tracks. After Mr. Greenwood completed his investigation on May 2, 2001, he observed Mr. Withers landward of the CCCL on a front-end loader and north of the cul-de-sac, proceeding west along the Easy Street Easement scraping off the top layer of soil and heading in a westward direction. Mr. Greenwood believed that the activity performed by Mr. Withers at this time was consistent with unpaved, road construction. According to Mr. Greenwood, the width of the scraped area appeared to be approximately the width of the bucket on Mr. Withers' front-end loader. Mr. Withers stated that he was doing minor grading landward of the CCCL with a John Deere 310-E front-end loader tractor when Mr. Greenwood was present on May 2, 2001. This tractor had a front bucket (approximately seven to eight feet wide) and a backhoe for excavating dirt on the back-end. Mr. Withers described the work which he performed when Mr. Greenwood was present as moving out and smoothing off the top of the sand landward of the CCCL in order for his equipment to get through. Mr. Withers also stated that he made areas in the easement seaward of the CCCL smooth by using the bottom of the bucket of his front-end loader to move sand around. Mr. Withers mentioned that he was very concerned that he needed to have the pathway he was utilizing in the access plan marked and smoothed off and fairly level. He believed the access plan authorized him to smooth off the areas on the access route. Mr. Withers stated that he had to have the access path level because he was bringing a self-propelled, 25-ton crane down the access path and they are top heavy and can get off balance, topple over, or get stuck. Mr. Withers described two types of work that he performed in the Easy Street Easement as: 1) clearing landward of the CCCL that required scooping and moving dirt, and 2) smoothing several areas seaward of the CCCL, just east of R-158 to around R- 160. An area of excavation damage seven feet seaward of the CCCL (beginning approximately 130 feet east of R-158) and an area 41 feet seaward of the CCCL (beginning at R-159, continuing east approximately 500 feet) are located within the area Mr. Withers stated he did some "smoothing off areas," again, east of R-158 and continuing east toward, but west, of R-160. Mr. Withers believed that Amended Permit FR-563 allowed him to use the Easy Street Easement in the access plan "to do . . . whatever was necessary and . . . needed to get [his] equipment, access [his] equipment down to the job site." He also admitted smoothing the areas. Mr. Withers also stated that Amended Permit FR-563 granted him permission to access the west end of Dog Island. Therefore, there was no need for him to locate the CCCL. Mr. Withers referred to the easement in the access plan as turning into a good pathway after he smoothed the areas. Mr. Withers stated that it was his "intention to gain access to the west end of Dog Island through a legal easement and an existing roadway" and that he wanted to utilize it. Mr. Withers testified "that he knew a lot of roads on Dog Island crossed seaward of the [CCCL]" in response to questioning whether he knew at the time of his performing work on the easement, whether or not the Easy Street Easement crossed seaward of the CCCL. He knew he was going to be traversing "fairly close" to the CCCL. Mr. Withers stated he did not knowingly violate the conditions of the Amended Permit. Mr. Withers was aware of the Department's permit requirements for work seaward of the CCCL when he performed his access work in the easement on Dog Island. However, Mr. Withers never had a survey done to figure out where the CCCL was located. Notice of the Alleged Violations Around May 2, 2001, the Department received a complaint that excavation was occurring seaward of the CCCL on Dog Island in the narrows area of the Easy Street Easement. On May 4, 2001, John A. Poppel, William Fokes, and Phil Sanders went to Dog Island on behalf of the Department to investigate the complaint of excavation in the narrows area seaward of the CCCL. On May 4, 2001, Mr. Poppel performed a survey of the narrows area and located the CCCL. He located monuments R-158- R-160. Department Exhibit 11. As a product of his survey, Mr. Poppel was able to depict the newly excavated roadway or pathway in relation to the CCCL. Mr. Poppel calculated that one area of damage was seven feet seaward of the CCCL and consisted of 503.8 square feet of damage and a second area of damage was 41 feet seaward of the CCCL and consisted of 5,305.6 square feet of damage. These square foot areas represent only the disturbed areas seaward of the CCCL, not the entire area between the CCCL and the Gulf of Mexico. Both areas of damage are within the area where Mr. Withers stated that he smoothed out the sand. As part of the May 4, 2001, investigation, William Fokes, an Engineer I with the Department, took photographs of the damaged areas and prepared an inspection report. Mr. Fokes' report indicates that an approximately 11-foot wide roadway or pathway had been cleared by excavation with the most seaward extent of the road being about 40 feet seaward of the CCCL. In addition, the report states that small dunes and beach vegetation had been destroyed. Mr. Fokes described the damage as excavation or grading done by some kind of machine, which cut and uprooted vegetation and pushed sand to the side as it leveled the ground. Mr. Fokes testified that the damage did not appear to be caused by merely traversing the area. Mr. Sanders, an engineer with the Department, processes CCCL permit applications and supervises Mr. Fokes, a field engineer. On May 4, 2001, Mr. Sanders observed the narrows area in question and confirmed that it looked like a "graded road" in that "[i]t appeared in the road bed that vegetation was gone and had been pushed out to the side, graded away," and that there was "excavation" seaward of the CCCL. Mr. Sanders stated that this activity did not comply with the approved access plan. On May 7, 2001, a Notice of Violation was issued to Mr. Withers for the "the unauthorized clearing and destruction of dunes and native vegetation for the purpose of constructing a roadway seaward of the coastal construction control line." Mr. Greenwood's photographs taken May 2, 2001, when compared with Mr. Fokes' photographs taken May 4, 2001, show that no discernable roadway or pathway was present landward or seaward of the CCCL in the narrows area at the time of Mr. Greenwood's inspection on May 2, 2001. This is evident when comparing Mr. Greenwood's photograph, Exhibit 15a, taken on May 2, 2001, with Department Exhibit 16g taken on May 4, 2001--the roadway or pathway present in the May 4, 2001, photo is absent in the May 2, 2001, photograph, and the vegetation has been removed from part of the area. Comparing Mr. Greenwood's photograph, Department Exhibit 15b, taken May 2, 2001, with Department Exhibits 16c and d, taken on May 4, 2001, also shows that the roadway or pathway was not present on the narrows portion of the Easy Street Easement at the time of Mr. Greenwood's inspection. The previously mentioned pictures, which were used for a comparison, were taken by two different people on separate dates, and from approximately the same locations. Also, Department Exhibit 16j was taken 250 feet east of R-159 and within the narrows area, facing east which shows clearing approximately 40 feet seaward of the CCCL. On May 14, 2001, at the request of the Department, Ken Jones, a principal engineer with Post Buckey et al., performed a damage assessment of the narrows portion of the Easy Street Easement which was seaward of the CCCL. Mr. Jones has a bachelor's degree in civil engineering and a master's degree in physical oceanography. Mr. Jones was familiar with the narrows area having been to Dog Island for recreation during the past 20 years and as a Dog Island property owner for the last three years. Mr. Jones described the narrows area as relatively flat and located between the St. George Sound to the north and the Gulf of Mexico beaches to the south. Between these two areas, the land is undulating sand and fairly consistent vegetation. At the time of Mr. Jones' damage assessment, he determined that a road had been cut through the vegetative portion of the dune of the narrows. Mr. Jones observed cut roots and a majority of the vegetation destroyed. Mr. Jones stated it appeared that the damage was caused by a vehicle with a blade on the front. The result was the road sat down in the sand approximately four to six inches. Mr. Jones stated that the work appeared to have been recent because distinct edges were still present. Mr. Jones took photographs and compiled an inspection report as part of his damage assessment. Mr. Jones testified that the damage "was pretty consistent from both landward and seaward of the [CCCL]." The pictures labeled Department Exhibits 18a1 and 18a2 depict a level pathway or roadway barren of vegetation seaward of the CCCL. Department Exhibit 18a4 is a photograph of a typical vegetated dune. Mr. Jones took this picture in order to have a general idea of what the vegetation coverage was in order to get an idea from a cost-estimating perspective. Mr. Jones's cost estimate for repairing the damage to the narrows area seaward of the CCCL, was approximately $7,500.00.4 Mr. Jones calculated the $7,500.00 by making an estimate of what it would cost to buy coastal vegetation, and by estimating what it would cost to employ laborers to hand rake the sand back into position and to plant the vegetation. Administrative Fine and Damages Jim Martinello, an environmental manager in charge of enforcement and compliance with the Bureau, used Mr. Jones' damage assessment estimate for informational purposes in assessing the damages amount for the narrows area. Mr. Martinello calculated the administrative fine and damages in accordance with Section 161.054, Florida Statues, and Rules 62B-54.002 and 62B-54.003, Florida Administrative Code. Rule 62B-54.002, Florida Administrative Code, provides that the Department shall assess fines for willful violations of, or refusing to comply with, for example, Section 161.053, Florida Statutes, and the fine should be sufficient to ensure immediate and continued compliance. In determining the actual fine within the range, the Department shall consider the offender's past violations, if any, and other aggravating or mitigating circumstances. Aggravating circumstances include prior knowledge of rules. Mitigating circumstances may be considered. Id. Mr. Withers had knowledge prior to the issuance of Amended Permit FR-563 of Department rules regarding permit requirements for construction activities seaward of the CCCL. On October 4, 1996, Mr. Withers, on behalf of Ben Withers Construction Company, was issued a warning letter for possible unauthorized construction seaward of the CCCL. This matter was resolved by entering into a consent order. On October 29, 1997, Mr. Withers, on behalf of Ben Withers Construction Company, was issued a warning letter for possible permit violation seaward of the CCCL. On November 13, 1997, Mr. Withers was issued a warning letter for possible unauthorized construction seaward of the CCCL. On October 27, 2000, Mr. Withers wrote a letter to Mr. McNeal indicating that he believed that the Easy Street Easement on Dog Island heading south from The Nature Conservancy cul-de- sac, then west to the west end of Dog Island, is landward of the CCCL and, therefore, no permit was necessary to reopen and use the easement, but he would have a surveyor establish the control line prior to work commencing. On November 7, 2000, Phil Sanders replied by letter to Mr. Withers' October 27, 2000 letter, in which Mr. Sanders reminded Mr. Withers of the pertinent rules and laws and suggested that Mr. Withers have the CCCL surveyed. On December 20, 2000, Mr. Martinello sent Mr. Withers an advisory letter informing him that the area he traversed (on July 2000) on the south route of the Easy Street Easement from the cul- de-sac on Dog Island was considered to be a dune as defined by Rule 62B-33.002, Florida Administrative Code. However, Mr. Martinello further advised that the Department did not take any action because "the traversing [did not] cause any substantial damage, it was minimal damage." In regard to the present case, it is more than a fair inference that Mr. Withers had specific knowledge of the CCCL and the Department's laws and rules, and that he knew excavation was not authorized seaward of the CCCL. The information in the prior Findings of Fact was used by the Department, and specifically Mr. Martinello, to determine that the harm to the beach resource or potential harm was major, and the administrative fine assessed was $7,500.00. However, part of Mr. Martinello's determination was predicated on Mr. Jones' assessment that the site one narrows violation was approximately 700 feet in length when, in fact, the area was approximately 500 feet in length, which explains in part the disparity between a 9,800 square foot area and the proven 5,305.6 square foot area. See Finding of Fact 78 and Endnote 4. Even the additional amount of damage of 503.8 square feet for the site two narrows area, when viewed in the aggregate, is significantly less than Mr. Jones' assessment of damages by square feet. (Mr. Martinello used the Jones' assessment as a guideline. Mr. Martinello says that the mistake did not alter his decision, although he was unaware of the mistake until the final hearing. He also says that Mr. Jones recommended a higher damage amount than the $5,000.00 assessed by the Department in its preliminary Final Order. He did--$7,500.00 for 9,800 square feet of damage.) Grossly negligent or knowing violations of statutes and Department rules regarding coastal construction seaward of the CCCL, which result "in harm to sovereignty lands seaward of mean high water or to beaches, shores, or coastal or beach-dune system(s), including animal, plant or aquatic life thereon," shall be considered in determining damages. Rule 62B-54.003(1), Florida Administrative Code. Rule 62B-54.003(2), Florida Administrative Code, provides that a damage amount greater than the minimum amounts may be assessed to ensure, immediate and continued compliance and the Department may consider, e.g., the need for restoration and the damaged ecological resource. The Department determined that the violation was knowing based on the factors mentioned above. The Department also considered the need for restoration and the damage to ecological resources and whether the amount would ensure immediate and continued compliance. Id. The Department determined that there was harm to the resource and that it was major and knowing. The Department proposed to assess the minimum damage amount of $5,000.00. On January 11, 2002, the Department entered a preliminary Final Order for the unauthorized grading and destruction of dunes and dune vegetation seaward of the control line for the purpose of constructing a roadway. The amount assessed in the Final Order was $12,500.00, $7,500.00 in administrative fines and $5,000.00 in damages, as described above. As noted, there has been harm to the beach area resource seaward of the CCCL and the Department proved the need for restoration and the damage to the ecological resource. In mitigation, Mr. Withers' construction access plan was approved by the Department. The Department knew that Mr. Withers intended to use the access route, which ran seaward of the CCCL from approximately R-157 to R-159 (except for a small portion between R-158 and R-159) in the narrows area; that Mr. Withers planned to transport equipment and materials by truck using the access route and necessarily would traverse seaward of the CCCL; and that he would continuously use the access route until the project was completed. The actual damaged area is less than originally determined by Mr. Jones, thus the need for restoration reduced. Mr. Jones, without the benefit of a survey, estimated the total cost to restore the damaged area of 9,800 square feet to be approximately $7,500.00. The total square feet of damage proven in this proceeding is 5,809.4 square feet in the narrows area and the Department is requesting $12,500.00 in fines and damages. Based on an approximate ratio of square feet and dollars needed to restore, a damage assessment in the amount of $4,500.00 is appropriate. Balancing the aggravating and mitigating circumstances, a fine of $3,500.00 is appropriate.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that a final order be rendered as follows: That a final order be issued adopting this Recommended Order; and Within 30 days of a final order being effective, Petitioners shall pay a fine of $3,500.00 and $4,500.00 in damages with the total amount of $8,000.00, to the Department of Environmental Protection. DONE AND ENTERED this 9th day of January, 2003, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 9th day of January, 2003.
The Issue The issue is whether Franklin County (County) has given reasonable assurance that it satisfies all requirements for an after-the-fact permit authorizing the construction of a rock revetment seaward of the coastal construction control line (CCCL) on Alligator Drive, also known as County Road 370.
Findings Of Fact The Nature of the Dispute The origins of this dispute date back a number of years. In short, the County currently has two adjoining revetments seaward of the CCCL on County Road 370 (Alligator Drive) located on Alligator Point in the southeastern corner of the County.1 County Road 370, situated immediately adjacent to the Gulf of Mexico, is a vulnerable structure and eligible for armoring. See Fla. Admin. Code R. 62B-33.002(64). The old revetment is permitted; the new revetment is not. Pursuant to a Department enforcement action directed at both revetments, the County applied for an after-the-fact permit to authorize the construction of the new revetment. See Case No. 12-3276EF. The two revetments, totaling around 2,800 feet in length, abut County Road 370 and join near the intersection of Alligator Drive and Tom Roberts Road. The road itself is around 50 or 60 feet from the edge of the revetments. The old revetment extends around 2,000 feet west of the intersection while the new revetment extends 800 feet east of the intersection. There is a curve in the road at the intersection, and at that point the road elevation drops two or three feet for an undisclosed distance. The revetments, however, run in a straight line. There is no beach and dune system in front of the old revetment, while a small amount of exposed sand is located on the far eastern end of the new revetment. Due to storm events over the years, unauthorized debris has been placed on top of the old revetment by the County. Under the terms of the enforcement action, the County is required to remove the debris. This will reduce the height of the old revetment by several feet below its original height of nine feet National Geodetic Vertical Datum (NGVD).2 Where the two revetments join, however, the height differs by only around a foot. The Bank owns property across the street from the old revetment and alleges that, for several reasons, the site and design of the new revetment, coupled with the reduction in height of the old revetment, will cause erosion of the shoreline around the old revetment and expose County Road 370 and the adjacent upland Bank property to erosion. Although the current design and location of the old revetment have been finalized through prior agency action, the Bank has asked that the permit be denied unless the County relocates rock boulders from the new to the old revetment and raises its height back to nine feet NGVD. The County asserts that the Bank's real aim here is to require the County, at taxpayer expense, to reconstruct the old revetment to its original height. Otherwise, the Department will not waive the 30-year erosion control line restriction and allow the Bank to fully develop its property that is seaward of the CCCL. See § 161.053(5)(b), Fla. Stat. The Old Revetment Since the late 1970s, the County has owned and maintained that portion of County Road 370 that is the subject of this dispute. In May 1986, the Department of Natural Resources, which was later merged with the Department, issued to the County CCCL Permit No. FR-204 for the construction of the old revetment, then 1,500 feet long. The revetment was located approximately 350 feet east of Department Reference Monument R-211 to approximately 150 feet west of the Department Reference Monument R-213. In November 1994, the Department issued to the County CCCL Permit No. FR-446 for the re-construction of the old revetment, as well as a 500-foot extension of the eastern limits of the structure with granite boulders. The revetment, as extended, is located approximately 540 feet west of Department Reference Monument R-212 to approximately 140 feet east of Department Reference Monument R-213. The permit did not authorize placement of any construction debris within the revetment. With the extension, the total length of the old revetment is now approximately 2,000 feet. After an application for a joint coastal permit to conduct a beach and dune restoration project was filed by the County in September 2006, a Department site inspection revealed the presence of concrete debris and other debris material stacked on top of the old revetment. A debris removal plan was formulated by the Department, which was intended to be incorporated as a special condition in the joint coastal permit. In May 2011, the joint coastal permit was approved and included a debris removal plan. Because of financial constraints, however, the County did not undertake and complete the work relating to the beach and dune restoration plan or the debris removal plan. In January 2012, another inspection was conducted by the Department to document how much debris was in the old revetment and where it was located. The inspection revealed the presence of a significant amount of concrete debris and other debris material scattered throughout the revetment and continuing eastward. That same month, largely at the urging of the Bank, the Department issued a one-count Notice of Violation (NOV) alleging that after a storm event in July 2005, the County placed unauthorized construction debris and other debris material in the old revetment seaward of the CCCL, and that the debris still remained within the footprint of the revetment. See Case No. 12- 3276EF. (The Bank unsuccessfully attempted to intervene in the enforcement action.) As corrective action, the County was required to remove all debris, seaward of the CCCL, from and adjacent to the footprint of the old revetment no later than 60 days after the end of the hurricane season. That work has not yet been performed, probably because the work on both revetments will take place at the same time. After the debris is removed, the height of the old revetment will vary from between five and eight feet NGVD rather than the original nine-foot height. This was not the relief that the non-party Bank desired in the enforcement action. Instead, the Bank has always wanted the old revetment to be reconstructed to the nine-foot NGVD standard authorized in the original construction permit. Even so, the enforcement action is now final, as no appeal was taken by the County. Except for the unauthorized debris, the old revetment meets all Department standards. The New Revetment Under emergency circumstances, between September 2000 and July 2005 the County placed material, including granite rock boulders and debris material, in a location east of the old revetment, seaward of the CCCL. The construction activity is located approximately 140 feet east of Department Reference Monument R-213 to approximately 80 feet east of Department Reference Monument R-214 and is around 800 feet in length. However, the County did not obtain a permit for the temporary structure within 60 days after its construction, as required by section 161.085(3), Florida Statutes. In July 2005, Hurricane Dennis made landfall in the Florida Panhandle causing damage to the shoreline along Alligator Drive. As an emergency measure after the storm event, the County placed rock boulders that had been displaced back into the new revetment seaward of the CCCL. The County also placed other unauthorized concrete debris and debris material within the footprint of the rock revetment seaward of the CCCL. Again, no timely authorization for this work was obtained by the County. In August 2012, the Department issued an Amended NOV in Case No. 12-3276EF adding a second count, which alleged that the County had failed to obtain a permit for the placement of the rock boulders and unauthorized debris. On April 18, 2013, the Department issued a Final Order in Case No. 12-3276EF. As to Count II, it gave the County two options for corrective action: (a) that the County submit "a complete permit application for a rigid coastal armoring structure located between Department reference monuments R-213 and R-214 that complies with all applicable Department permitting rules and statutes"; or (b) that "the County remove all material placed seaward of the CCCL pursuant to a Department approved debris removal plan[,]" leaving that portion of County Road 370 without a revetment. 2013 Fla. ENV LEXIS 16 at *16. Desiring to protect its infrastructure, the County opted to apply for an after-the-fact permit. The Permit Application In March 2013, the County filed an application for an after-the-fact permit for the construction of the new revetment. As directed by the Department, the County proposes to construct a new revetment located between Department Reference Monuments R- 213 and R-214. The height of the new revetment will be around nine feet NGVD, while its slope will be one vertical to three horizontal. The old revetment is not quite as steep, having a slope of one vertical to two horizontal. The application includes a debris removal plan for the removal of construction debris as well as other debris scattered through the new revetment. Construction debris occupies a large portion of the new revetment and largely appears to be associated with storm damaged concrete sidewalk. All derelict concrete and asphalt material that is located water ward of Alligator Drive and landward of the mean high water line is to be removed. Both the County and its engineering consultant will monitor the work at the project. After reviewing the application, the Department proposed to issue after-the-fact CCCL Permit FR-897. The Bank then filed its Petition, as later amended. Petitioner's Objections As summarized in its PRO, the Bank alleges that the County did not give reasonable assurance that the following statutory and rule provisions have been satisfied: section 161.053(1)(a), which provides that special siting and design considerations shall be necessary seaward of the CCCL "to ensure protection of . . . adjacent properties"; rule 62B-33.005(2), which requires that the applicant provide the Department with sufficient information to show that adverse impacts associated with the construction have been minimized and that construction will not result in a significant adverse impact"; rule 62B-33.005(3)(a), which requires that the Department "[d]eny any application for an activity which either individually or cumulatively would result in a significant adverse impact including potential cumulative effects"; rule 62B-33.0051(2), which provides that armoring "shall be sited and designed to minimize adverse impacts to the beach and dune system, marine turtles, native salt-tolerant vegetation, and existing upland and adjacent structures"; and rule 62B-33.0051(2)(a), which requires armoring to "be sited as far landward as practicable to minimize adverse impacts . . . on existing upland and adjacent structures." See PRO, pp. 16-17. A common thread in these regulatory citations is that a revetment should be constructed in a manner that does not cause adverse impacts on "adjacent property." Except for the above cited provisions, no other permit requirements are contested, and the County's prima facie case satisfied those other requirements. The Bank's odd-shaped property, acquired in a foreclosure proceeding, abuts that portion of Alligator Drive immediately adjacent to the old revetment. The eastern boundary of the Bank's property is at least 300 feet west of the new revetment and extends westward along County Road 370 until it intersects with Harbor Circle. The entire tract is separated from the old revetment by County Road 370, a two-lane paved road. The property was once used as a KOA campground; however, the predecessor owner acquired development rights for a Planned Unit Development, which apparently cannot be fully developed unless the old revetment is raised back to its original height by the County or some other acceptable form of erosion protection is provided by the Bank at its own expense. The essence of the Bank's complaint is that the new revetment, as now sited and designed, will expose the old revetment to a higher rate of erosion, and ultimately accelerate the erosion of its property across the street. The Bank asserts that this will occur for three reasons. First, the removal of construction debris from the old revetment will lower its height, weaken the structure, and create a "discontinuity in height and composition between the revetments," resulting in increased exposure to erosion. Second, the toe of the new revetment (at the western end of the structure) will extend ten feet further seaward than the old revetment, creating a discontinuity and placing the old revetment at higher exposure to erosion. Finally, the Bank contends a discontinuity already exists between the two revetments due to the curved shape of the road at the intersection, causing the western end of the new revetment to extend further seaward than the old revetment. The Bank argues that the discontinuity will amplify the wave action on the shoreline during a severe storm event and eventually cause a breach of the old revetment. In sum, the Bank is essentially arguing that unless the two revetments mirror each other in height and slope, and consist of the same construction materials, the after-the-fact permit must be denied. The Bank's expert, Mr. Chou, a coastal engineer, was employed shortly before the final hearing and made one visit to the site. Regarding the removal of unauthorized construction debris from the old revetment, Mr. Chou was concerned that, while not ideal, the debris offers a degree of shoreline protection. He recommended that if removed, the debris be replaced with boulders comparable to the design standard of the new revetment. However, the record shows that when the loose and uneven debris is removed from the old revetment, the existing rocks will be moved to an interlocking or "chinking" configuration that actually enhances the stability and integrity of the structure.3 The Bank is also concerned that the height and slope of the two revetments differ. Mr. Chou testified that there exists the increased potential for erosion as a result of what he described as a discontinuity, or a difference of characteristics, between the two revetments. He opined that the protective function of the old revetment will be compromised by the removal of the granite boulders, which will lower the overall height of the revetment between two and four feet. According to Mr. Chou, if the new revetment suffers a direct hit by a major storm, i.e., one capable of dislodging the armor, he would "expect damage, significant damage, right next to it." Mr. Chou conceded, however, that if a permit is not approved, and the County elects to remove the new revetment, it could result in a significant adverse impact to property located along Alligator Drive. Mr. Chou further acknowledged that there will be no significant adverse effect on the old revetment during "everyday" winds, waves, and currents. Finally, he agreed that if the toes of the new and old revetments are essentially the same, as the certified engineering plans demonstrate they are, it will "minimize" the discontinuity that he describes. Notably, in 2005, Hurricane Dennis actually caused accretion (an increase in sand) on the Bank property, rather than erosion. While there are some differences in height and slope between the two revetments, no meaningful differences from an engineering perspective were shown. Through the County's coastal engineer, Mr. Dombrowski, who over the years has visited the site dozens of times and worked on a number of major projects in the area, it was credibly demonstrated that the old and new revetments will, in effect, form one continuous armoring structure that will provide shoreline protection along Alligator Drive. In terms of toe, slope, height, and construction material, there will be one continuous and straight revetment along the road, with a "fairly consistent elevation and slope going from one end to the other." If a major storm event occurs, the impacts to both revetments will likely be the same. In any event, there is no requirement that the County construct a revetment that is storm proof or prevents severe storm damage. The preponderance of the evidence demonstrates that the new revetment is consistent with the siting and design criteria in rule 62B-33.0051(2). The design of the new revetment is consistent with generally accepted engineering practice. The new revetment is sited and designed so that there will be no significant adverse impacts, individually or cumulatively, to the adjacent shoreline. See Fla. Admin. Code R. 62B-33.005(3). The County has provided the Department with sufficient information to show that adverse and other impacts associated with the construction are minimized, and the new revetment will not result in a significant adverse impact to the Bank's property. See Fla. Admin. Code R. 62B-33.005(2). The new revetment should toll erosion – which now occurs on Alligator Point at the rate of five feet per year -- and provide shoreline protection. Finally, the construction of the new revetment will not cause an adverse impact to the old revetment. For all practical purposes, the two revetments have existed side-by-side since 2005. The Bank failed to offer any credible evidence that the new revetment has had a significant adverse impact on the old revetment over the last nine years.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order approving the County's application for after- the-fact permit number FR-897. DONE AND ENTERED this 23rd day of July, 2014, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 23rd day of July, 2014.