PRINCE CONTRACTING, LLC vs DEPARTMENT OF TRANSPORTATION, 16-004982BID (2016)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 29, 2016 Number: 16-004982BID Latest Update: Jan. 20, 2017

The Issue Whether Respondent acted contrary to the agency's governing statutes, rules, or policies or the bid specifications in its proposed decision to award Contract No. T7380 to Astaldi Construction Corporation ("Astaldi").

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing, and on the entire record of the proceeding, the following Findings of Fact are made: The Department is a state agency authorized by section 337.11 to contract for the construction and maintenance of roads within the State Highway System, the State Park Road System, and roads placed under its supervision by law. The Department is specifically authorized to award contracts under section 337.11(4) to “the lowest responsible bidder.” On April 15, 2016, the Department advertised a bid solicitation for Contract T7380, seeking contractors for the widening of a 3.8 mile portion of U.S. Highway 301 in Hillsborough County from two lanes to six lanes between State Road 674 and County Road 672 and over Big Bull Frog Creek. The advertisement provided a specification package for the project and the “Standard Specifications for Road and Bridge Construction” (“Standard Specifications”) used on Department roadway projects. The work included seven components: bridge structures (Section 0001), roadway (Section 0002), signage (Section 0003), lighting (Section 0004), signalization (Section 0005), utilities (Section 0006), and intelligent transportation systems (Section 0007). The advertisement identified 666 individual items of work to be performed and quantity units for each item. The project was advertised as a low-bid contract with a budget estimate of $51,702,729. The Department’s bid proposal form contains five columns with the following headings: Line Number; Item Number and Item Description; Approximate Quantities and Units; Unit Price; and Bid Amount. The bid proposal form contains line items for the seven components of the project. The utilities component contains 42 line items, each with an Item Number and Item Description. For example, Line Number 1410 corresponds with the following Item Number and Item Description: “1050 11225 Utility Pipe, F&I, PVC, Water/Sewer, 20–40.9 [inches].” Each bidder inserts a Unit Price for the line item in the corresponding “Unit Price” column. The “Bid Amount” column for each line item is an amount generated by multiplying a bidder’s Unit Price by the Quantities (determined by the Department) for each Line Number. The Bid Amount for each Line Number is then added together to generate the “Total Bid Amount” representing the bid for the entire project. Astaldi, Prince, Hubbard, and other potential bidders attended the mandatory pre-bid meeting. Prequalified contractors were given proposal documents that allowed them to enter bids through Bid Express, the electronic bidding system used by the Department. Plan revisions were issued by addenda dated May 10, 2016, and June 7, 2016. A Question and Answer Report was published and updated as inquiries were addressed. Bids were opened on the letting date of June 15, 2016. Bids for Contract T7380 were received from Astaldi, Prince, Hubbard, the DeMoya Group (“DeMoya”), Ajax Paving Industries of Florida, LLC (“Ajax”), and Cone & Graham, Inc. (“Cone & Graham”). The bids were reviewed by the Department’s contracts administration office to ensure they were timely, included a Unit Price for each line item, and contained the completed certifications required by the specifications. Bidders were checked against the Department’s list of prequalified bidders to confirm they possessed a certification of qualification in the particular work classes identified by the bid solicitation. Each bidder’s total current work under contract with the Department was examined to ensure that award of Contract T7380 would not place the bidder over its Department-designated financial capacity limit. Astaldi submitted the lowest bid, a total amount of $48,960,013. Prince submitted the next lowest bid, a total amount of $57,792,043. Hubbard’s total bid was the third lowest at $58,572,352.66. The remaining bidders came in as follows: DeMoya, $63,511,686.16; Ajax, $68,617,978.10; and Cone & Graham, $70,383,697.74. All bidders were prequalified in the appropriate work classes and had sufficient financial capacity, in accordance with section 337.14 and Florida Administrative Code Chapter 14-22. The Department’s construction procurement procedure, from authorization to advertisement through contract execution, is outlined in the Department’s “Road and Bridge Contract Procurement” document (“Contract Procurement Procedure”). The scope statement of the Contract Procurement Procedure provides: “This procedure applies to all Contracts Administration Offices responsible for advertising, letting, awarding, and executing low bid, design-bid-build, construction, and maintenance contracts.” Limited exceptions to the procedure may be made if approved by the assistant secretary for Engineering and Operations. If federal funds are included, the Federal Highway Administration division administrator, or designee, must also approve any exceptions from the procedure. The stated objectives of the Contract Procurement Procedure are: “to standardize and clarify procedures for administering low-bid, design-bid-build, construction, and maintenance contracts” and “to provide program flexibility and more rapid response time in meeting public needs.” The Department’s process for review of bids is set forth in the “Preparation of the Authorization/Official Construction Cost Estimate and Contract Bid Review Package” (“Bid Review Procedure”). The scope statement of the Bid Review Procedure states: This procedure describes the responsibilities and activities of the District and Central Estimates Offices in preparing the authorization and official construction cost estimates and bid review packages from proposal development through the bid review process. Individuals affected by this procedure include Central and District personnel involved with estimates, specifications, design, construction, contracts administration, work program, production management, federal aid, and the District Directors of Transportation Development. The Bid Review Procedure contains a definitions section that defines several terms employed by the Department to determine whether a bid or a unit item within a bid is “unbalanced.” Those terms and their definitions are as follows: Materially Unbalanced: A bid that generates reasonable doubt that award to that bidder would result in the lowest ultimate cost or, a switch in low bidder due to a quantity error. Mathematically Unbalanced: A unit price or lump sum bid that does not reflect a reasonable cost for the respective pay item, as determined by the department’s mathematically unbalanced bid algorithm. Official Estimate: Department’s official construction cost estimate used for evaluating bids received on a proposal. Significantly Unbalanced: A mathematically unbalanced bid that is 75% lower than the statistical average. Statistical Average: For a given pay item, the sum of all bids for that item plus the Department’s Official Estimate which are then divided by the total number of bids plus one. This average does not include statistical outliers as determined by the department’s unit price algorithm. For every road and construction project procurement, the Department prepares an “official estimate,” which is not necessarily the same number as the “budget estimate” found in the public bid solicitation. The Department keeps the official estimate confidential pursuant to section 337.168(1), which provides: A document or electronic file revealing the official cost estimate of the department of a project is confidential and exempt from the provisions of s. 119.07(1) until the contract for the project has been executed or until the project is no longer under active consideration. In accordance with the Bid Review Procedure, the six bids for Contract T7380 were uploaded into a Department computer system along with the Department’s official estimate. A confidential algorithm identified outlier bids that were significantly outside the average (such as penny bids) and removed them to create a “statistical average” for each pay item. Astaldi’s unit pricing was then compared to the statistical average for each item. The computer program then created an “Unbalanced Item Report,” flagging Astaldi’s “mathematically unbalanced” items, i.e., those that were above or below a confidential tolerance value from the statistical average. The unbalanced item report was then reviewed by the district design engineer for possible quantity errors. No quantity errors were found.1/ The Department then used the Unbalanced Item Report and its computer software to cull the work items down to those for which Astaldi’s unit price was 75 percent more than or below the statistical average. The Department sent Astaldi a form titled “Notice to Contractor,” which provided as follows: The Florida Department of Transportation (FDOT) has reviewed your proposal and discovered that there are bid unit prices that are mathematically unbalanced. The purpose of this notice is to inform you of the unbalanced nature of your proposal. You may not modify or amend your proposal. The explanation of the bid unit prices in your proposal set forth below was provided by ASTALDI CONSTRUCTION CORPORATION on ( ) INSERT DATE. FDOT does not guarantee advanced approval of: Alternate Traffic Control Plans (TCP), if permitted by the contract documents; Alternative means and methods of construction; Cost savings initiatives (CSI), if permitted by the contract documents. You must comply with all contractual requirements for submittals of alternative TCP, means and methods of construction, and CSI, and FDOT reserves the right to review such submittals on their merits. As provided in section 5-4 of the Standard Specifications for Road and Bridge Construction you cannot take advantage of any apparent error or omission in the plans or specifications, but will immediately notify the Engineer of such discovery. Please acknowledge receipt of this notice and confirmation of the unit bid price for the item(s) listed below by signing and returning this document. Section 5.4 of the Bid Review Procedure describes the Notice to Contractor and states: “Contracts are not considered for award until this form has been signed and successfully returned to the Department per the instruction on the form.” State estimating engineer Greg Davis testified that the stated procedure was no longer accurate and “need[s] to be corrected” for the following reason: Since the procedure was approved back in 2011, we’ve had some subsequent conversations about whether to just automatically not consider the award for those that are not signed. And since then we have decided to go ahead and just consider the contract, but we are presenting a notice, of course, unsigned and then let the technical review and contract awards committee determine. Astaldi signed and returned the Notice to Contractor and noted below each of the ten listed items: “Astaldi Construction confirms the unit price.” Mr. Davis explained that the purpose of the Notice to Contractor form is to notify the contractor that items have been identified as extremely low and to ask the contractor to confirm its understanding that in accepting the bid, the Department will not necessarily approve design changes, methods of construction, or maintenance of traffic changes. Section 6.6 of the Contract Procurement Procedure sets forth the circumstances under which an apparent low bid must be considered by the Department’s Technical Review Committee (“TRC”) and then by the Contract Awards Committee (“CAC”). Those circumstances include: single bid contracts; re-let contracts; “significantly mathematical unbalanced” bids; bids that are more than 25 percent below the Department’s estimate; 10 percent above the Department’s estimate (or 15 percent above if the estimate is under $500,000); materially unbalanced bids, irregular bids (not prepared in accordance with the Standard Specifications); other bid irregularities2/; or “[a]ny other reason deemed necessary by the chairperson.”3/ Bids that are not required to go before the TRC and CAC are referred to as “automatic qualifiers.” Because it was mathematically unbalanced, the Astaldi bid was submitted to the TRC for review at its June 28, 2016, meeting. The TRC is chaired by the Department’s contracts administration manager, Alan Autry, and is guided by a document entitled “Technical Review Committees” (“TRC Procedure”). The TRC Procedure sets forth the responsibilities of the TRC in reviewing bid analyses and making recommendations to the CAC to award or reject bids. The TRC voted to recommend awarding Contract T7380 to Astaldi. The TRC’s recommendation and supporting paperwork was referred to the CAC for its meeting on June 29, 2016. The duties of the CAC are described in a document entitled “Contracts Award Committees” (“CAC Procedure”). Pursuant to the CAC Procedure, the CAC meets approximately 14 days after a letting to assess the recommendations made by the TRC and determines by majority vote an official decision to award or reject bids. Minutes for the June 29, 2016, CAC meeting reflect 21 items before the committee including: two single bid contracts; four bids that were 10 percent or more above the official estimate; one bid that was 15 percent or more above the official estimate on a project under $500,000; three bids that were more than 25 percent below the official estimate; and 11 bids with significantly unbalanced items, including Contract T7380 with an intended awardee of Astaldi. The CAC voted to award Contract T7380 based on the low bid submitted by Astaldi. A Notice of Intent to award the contract to Astaldi was posted on June 29, 2016. As noted at Finding of Fact 2, supra, Contract T7380 consisted of seven components: structures, roadway, signage, lighting, signalization, utilities, and intelligent transportation system. The Department does not compare bids by component, but looks at the total bid amount to find the lowest bidder. The Department also reviews the bids for discrepancies in individual unit items using the process described above. Astaldi’s bid of $48,960,013 was approximately $8.8 million below Prince’s bid of $57,792,043, $9.6 million less than Hubbard’s bid of $58,572,352, and $2.7 million below the Department’s public proposal budget estimate of $51,702,729. As part of its challenge to the intended award, Prince performed a breakdown of bids by individual components and discovered that nearly all of the differences between its bid and Astaldi’s could be attributed to the utilities component. Astaldi’s bid for the utilities component was $7,811,720, which was roughly $8.5 million below Prince’s utilities bid of $16,305,903 and $5.8 million below Hubbard’s utilities bid of $13,603,846.4/ The utilities component was included pursuant to an agreement between the Department and Hillsborough County, the owner of the water and sewer lines, relating to the improvement of water and sewer lines along the roadway limits of the project. The utility work consists of installing a new water- line and force main sewer. The existing water main and the existing force main conflict with the proposed location of the new storm drainage system. The new water main and force main must be installed, tested, and approved before being put into active service. To prevent water utility outages to customers, the new system must be installed and approved before the existing waterline and existing force main can be cut off and removed. Utility work is therefore the first task to be performed on Contract T7380. Once the utility component is completed, the contractor will furnish and install the stormwater system, the roadway, the bridgework, and all other components. Article 3-1 of the Standard Specifications5/ reserves to the Department the right to delete the utility relocation work from the contract and allow the utility owner to relocate the utilities. Utilities are the only portion of a Department contract subject to deletion because the funding is provided by the utility owner, which usually has allocated a certain dollar figure to contribute towards the contract prior to the bidding. If the bid for utilities comes in over the utility owner’s budget, the owner can opt out of the contract and self-perform. In this case, Hillsborough County had contracted with the Department to contribute $8.9 million for utility relocation work. The Department did not exercise the option to delete the utilities portion of the contract. Jack Calandros, Prince’s chief executive, testified that Prince uses a computer program called HeavyBid, created and supported by a company called HCSS, to build the cost components of its bids. Every witness with industry knowledge agreed that HeavyBid is the standard program for compiling bids in the construction field. Mr. Calandros testified that cost components include material quotes provided by third-party vendors and quotes from potential subcontractors. Labor and equipment costs are ascertained by using historical rates and actual cost estimates that are tracked by the HeavyBid software. Prince maintains its own database of costs derived from 20 years’ experience. Mr. Calandros stated that Prince’s internal labor and equipment rates are checked and adjusted at least once a year to ensure they are current and accurate based on existing equipment and personnel. Prince received three vendor quotes for the materials to perform the utility work on Contract T7380. In compiling its bid, Prince ultimately relied on a final quote from Ferguson Waterworks (“Ferguson”) of $8,849,850. Based on this materials quote and Prince’s overall utilities bid of $16,305,903, Mr. Calandros opined that it would not be possible for Astaldi to perform the utilities component for its bid amount of $7.8 million. Prince’s estimating expert, John Armeni, reviewed Astaldi’s bid file, read the deposition testimony of Astaldi’s chief estimator, Ed Thornton, and spoke to Mr. Thornton by telephone. Mr. Armeni also reviewed Prince’s bid and the bid tabulation of all bidders’ utilities component line items. Based on his review and his extensive experience in the industry, Mr. Armeni concluded that Astaldi’s bid does not include all costs for labor, material, and equipment necessary to construct the utilities portion of this project. Mr. Armeni reviewed the materials quote from Ferguson that Prince used in its bid. He noted that Astaldi’s bid file contained an identical quote from Ferguson of $8.8 million for materials, including some non-utilities materials. Mr. Armeni noted that the Ferguson quote for utilities materials alone was approximately $8 million, an amount exceeding Astaldi’s entire bid for the utilities portion of the project. Mr. Armeni also noted that Astaldi’s overall bid was 18 percent below that of the second lowest bidder, Prince. He testified that 18 percent is an extraordinary spread on a bid where the Department is providing the quantities and all bidders are working off the same drawings and specifications. Mr. Armeni believed that the contracting authority “should start looking at it” when the difference between the lowest and second lowest bidder is more than 10 percent. In his deposition, Mr. Thornton testified he was not aware of how Astaldi arrived at its bid prices for the utility section of the project. Mr. Thornton indicated multiple times that he was not Astaldi’s most knowledgeable person regarding the bid submitted by Astaldi on Contract T7380 project. He testified that Astaldi intended to subcontract the utilities work and acknowledged that the company received a subcontractor quote of $14.9 million after the bids were submitted. Mr. Thornton did not know if Astaldi had solicited the quote. He said it is not unusual for a company to receive subcontractor bids after it has been named the low bidder on a project. Mr. Thornton conceded that Astaldi’s bid did not include all the costs necessary to construct the utilities portion of Contract T7380. At his deposition, he did not have before him the materials needed to determine which items of cost Astaldi had omitted. Mr. Thornton testified that Astaldi was not missing any information it needed at the time of bid submission and understood that its price was to include all labor, materials, and subcontracting costs to perform the contract. After the proposed bid award, Astaldi used HeavyBid to produce a report indicating that the company now estimates its cost of performing the contract at $53,708,129.03, or roughly $4.75 million more than its winning bid. Mr. Thornton testified that Astaldi nonetheless stood ready to execute the contract and perform the work at its bid price. Central to the dispute in this case is Standard Specifications Section 9, “Measurement and Payment,” article 9-2 of which is titled “Scope of Payments.” In particular, subarticle 9-2.1 provides: 9-2.1 Items Included in Payment: Accept the compensation as provided in the Contract as full payment for furnishing all materials and for performing all work contemplated and embraced under the Contract; also for all loss or damage arising out of the nature of the work or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its final acceptance; also for all other costs incurred under the provisions of Division I. For any item of work contained in the proposal, except as might be specifically provided otherwise in the payment clause for the item, include in the Contract unit price (or lump sum price) for the pay item or items the cost of all labor, equipment, materials, tools and incidentals required for the complete item of work, including all requirements of the Section specifying such item of work, except as specially excluded from such payments. Prince contends that the second paragraph of subarticle 9-2.1 renders Astaldi’s bid nonresponsive because Astaldi admittedly failed to include “the cost of all labor, equipment, materials, tools and incidentals” in its bid. Prince points out that the “Technical Special Provisions” governing the utilities portion of the project reinforce the requirement that each bidder include all costs for the work. Technical Special Provisions Section 1-7.1 provides that “[p]ipe installation cost shall include all necessary work, equipment, and labor needed for installing the pipe, such as, coordination with existing utilities and support during construction and support of existing power poles during construction.” Technical Special Provisions Section 1-8.1 goes on to say that “[n]o separate payment will be made for the following items for work under this Technical Special Provision and the cost of such work shall be included in the applicable contract pay items of work,” followed by a comprehensive list of 30 items. Prince concludes that the requirement that each bidder include all costs, including costs of all necessary labor, equipment, and materials, in the Unit Price for each work item is “manifest” in the bid specifications and requires rejection of any bid that does not include all costs. Mr. Armeni opined that if one bidder excludes a portion of its costs, the other bidders are placed at a competitive disadvantage. Alan Autry, the Department’s central contracts administration manager, testified that five other projects were let as part of the bid package that included Contract T7380. He stated that it is typical for the Department to list multiple projects on one day. Mr. Autry’s office usually performs one bid letting per month, with the holiday months of November and December rolled together in a single letting. Mr. Autry stated that his office lets between 200 and 300 projects per year, not counting contracts that are let at the district level. Twenty other contracts were before the CAC at the June 29, 2016, meeting at which the Astaldi award in this case was approved. As noted at Finding of Fact 2, supra, Contract T7380 included 666 line items. Six companies submitted bids, meaning there were a total of 3,996 line items in this single contract. Assuming that the 200 to 300 other projects let by the Department’s Tallahassee office contain similar numbers, there are more than one million line items bid in any given year. If Prince’s reading of the bid specifications is correct, the Department is required to examine each of these line items and somehow make a determination whether the item includes all of the bidder’s costs. This problem of determining bidder cost is complicated by the presence of “companion” or “sister” items in bids, i.e., two items that must be considered in tandem to arrive at something like the actual cost of the work. Prince provided an example of such companion items in its analysis of the bids in this project. Two bid items included in the structures section of the bid proposal form were concrete culverts and reinforcing steel. The contractor may cast the culverts in place at the worksite or purchase them precast. If the concrete culvert is cast in place at the worksite, then reinforcing steel must be used to strengthen the culvert. If the concrete culvert is precast by a materials supplier, then the reinforcing steel has already been incorporated into the culvert at the time of installation. Mr. Calandros explained that when a contractor uses precast culverts, there is no need to list a separate additional cost for reinforcing steel; all costs are captured in the line item for concrete culverts. In this bid, Prince used precast culverts and therefore bid a penny per unit for reinforcing steel.6/ Bidders who cast the culverts in place showed a much higher cost for reinforcing steel but a lower cost for the concrete culverts. When the “companion items” were considered in tandem, the total cost for each vendor was fairly consistent. Prince’s explanation for companion items was coherent but did not explain how the Department is supposed to know which items are companion items as it undertakes the line-by-line cost examination of each bid in accordance with Prince’s reading of the bid specifications. Prince also failed to provide an explanation as to how the Department is to determine a bidder’s costs for any one line item or, for that matter, for its overall bid on a project. Bidders consider their cost information and the processes by which they build bids to be confidential proprietary information. In the instant case, Prince disclosed its own information (aside from materials costs) only under seal during litigation. In its ordinary course of business, the Department does not have access to this information. In fact, as noted at Finding of Fact 23, supra, the Department does not compare bids by component. It looks only at the total bid amount in determining the lowest bidder. Standard Specifications Article 3-8 reserves to the Department the right to perform an audit of the contractor’s records pertaining to the project upon execution of the contract. No authorization is provided to audit records of bidders prior to contracting. Standard Specifications Subarticle 2-5.1 allows bidders to indicate “free” or “$.00” for items that will be supplied at no cost to the Department. Though the Department’s practice, according to Mr. Autry, is to include zero bid items on the Notice to Contractor for confirmation of the price, subarticle 2-5.1 requires no Department investigation as to whether the bidder’s cost for a zero bid is actually zero. Bidders often bid a penny on items, as Prince did on reinforcing steel in this case. Standard Specifications Article 3-5 requires all contracts to be secured by a surety bond such that, in the event of a default by the contractor, the surety company will indemnify the Department on all claims and performance issues. Standard Specifications Section 4 provides that the scope of work is to be determined within the contract, including the furnishing of all labor, materials, equipment, tools, transportation, and supplies required to complete the work. The Department is authorized to make changes to the scope of work and make equitable adjustments of payments. If necessary, the Department may enter into supplemental agreements for additional or unforeseen work. Prince cautions that these change provisions could become relevant because Astaldi’s bid contains no information explaining how Astaldi will cover the $4.75 million difference between its bid price and its actual cost to perform the contract. Prince accurately states that nothing in Astaldi’s bid demonstrates that it has cash reserves to cover the loss and still complete the entire scope of the work.7/ Prince contends that this lack of demonstrable reserves renders Astaldi nonresponsible as to this project. Prince argues that it is error for the Department to rely on Astaldi’s certificate of qualification as proof of the company’s responsibility. The certificate of qualification process considers a contractor’s financial status at the time it submits its financial statements and other information regarding company resources. Prince contends that the Department’s assessment of the contractor’s financial statements and issuance of a certificate of qualification is insufficient to determine the contractor’s responsibility on a given bid. Prince argues that the Department is required by its governing statutes and the Standard Specifications to award a particular contract to the particular bidder that is the lowest, responsive, and responsible bidder, and that “responsible” for a given project is not synonymous with “prequalified.” Prince hypothesizes that under the Department’s practice, a bidder could possess a certificate of qualification issued in January, be indicted in another state for fraud and bribery in February, submit the lowest bid for a Department project in March, and be awarded the contract. By relying solely on the bidder’s certificate of qualification to determine responsibility, the Department could award a contract to a nonresponsible bidder. Section 337.14 provides that any person desiring to bid on any construction contract in excess of $250,000 must first be certified by the Department. Mr. Autry explained that the Department prequalifies contractors to submit bids on certain types of contract, such as major bridges and structures. Contractors applying for certification are required to submit their latest annual financial statements. The Department is charged with reviewing applications to determine “whether the applicant is competent, is responsible, and possesses the necessary financial resources to perform the desired work.” § 337.14(3), Fla. Stat. The Department assigns the contractor work classes and a total capacity after evaluating its experience and financials. The Department’s certificate is good for 18 months, though the contractor’s capacity is reviewed annually. At the time of a particular bid, the Department verifies the contractor’s available capacity, which is simply its total assigned capacity minus current work the contractor is performing for the Department. Mr. Autry testified that the Department does not go back and look at a bidder’s financials to determine whether it can sustain a loss on a given project. The Department does not repeat its capacity analysis during the year, regardless of how many projects the company bids on. The Department’s analysis is limited to whether the company’s current capacity is sufficient for the project on which it is bidding.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED that the Department of Transportation enter a final order dismissing Prince Contracting, LLC’s, second amended formal written protest and awarding Contract T7380 to Astaldi Construction Corporation. DONE AND ENTERED this 22nd day of December, 2016, in Tallahassee, Leon County, Florida. S LAWRENCE P. STEVENSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 22nd day of December, 2016.

Florida Laws (18) 1.01119.07120.52120.53120.54120.56120.569120.57120.68129.0320.23334.048337.015337.11337.14337.16337.164337.168 Florida Administrative Code (1) 28-106.217
# 1
PHILIP J. PROCACCI AND WHARTON INVESTMENT GROUP, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, DONALD J. CERLANEK, AND SUZANNE CASEY, 90-002459BID (1990)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Apr. 24, 1990 Number: 90-002459BID Latest Update: Sep. 27, 1990

The Issue The issues are 1) Whether the Department of Health and Rehabilitative Services (HRS) properly rejected all bids on Lease Bid No. 590:2133, and 2) Whether either Petitioner is entitled to award of Lease Bid No. 590:2133 as the lowest and best responsive bidder.

Findings Of Fact On October 16, 1989, HRS issued an Invitation to Bid (ITB) on Lease Bid No. 590:2133 for 43,634 net square feet of office space in Ocala, Marion County, Florida. The bid package contained specifications, evaluation criteria, and numerical weight to be assigned to each criteria. The bid package indicated the area of emphasis placed on the facility by HRS which focused on client safety, public access, availability of public transportation, and parking. The emphasis on each area was indicated by the weighted points to be given in each area. On January 24, 1990, HRS received bids from both Wharton and Curtis. Both bids were responsive. Curtis submitted the apparent low bid and Wharton submitted the apparent second lowest bid. Curtis, as Trustee, is the owner of the property which is presently occupied by HRS in Ocala, Florida. The lease on these premises was awarded in 1980 and expires in 1990. Curtis purchased the leasehold in April of 1988 while HRS was a tenant and subject to the existing lease. Philip J. Procacci is the President of Procacci Development which is the general partner in Wharton Investment Group. The actual bids submitted were not offered into evidence by any party in this proceeding. Susanne Casey, the District Administrator of HRS District 3, is ultimately responsible for the leasing of all HRS facilities in the district, including facilities in Marion County. Casey appointed a bid evaluation committee to review and evaluate the responsive bids based on the criteria stated in the bid package. The committee was to make a recommendation regarding the lowest and best bidder. Before the bids were opened, the bid evaluation committee met and agreed upon objective parameters for each of the evaluation criteria. These parameters established standards against which each committee member could independently evaluate and award points on each bid. The evaluation criteria in the bid package assigned points in three major categories: associated fiscal costs, location, and facility. Associated fiscal coasts were further broken down into (a) rental rates for the basic lease term, (b) rental rates for optional renewal terms, and (c) associated moving costs. The maximum points available in each of these categories were fixed in the bid package and could not be altered by the committee. These criteria are standard in a lease procurement through out the state. State regulations require that all bids for lease space in the state evaluate rental rates using present value methodology. See Rule 13M-1.029, Florida Administrative Code. This means that the proposed rental rates in all bids are calculated to present value dollars for the purpose of comparison. The Department of General Services has a computer program, the sole function of which is to calculate the present value of the rental rates. The program has nothing to do with the assignment of points under the criteria, but is used as a tool to allow comparison of the bids. The present value of the Curtis bid was $662,464 lower than the present value of the Wharton bid. The rental rates were awarded points under criterion 1a of associated fiscal costs. The committee awarded the full 20 points to Curtis and awarded 5 points to Wharton. The committee members awarded these points in accordance with the standards and formula they had agreed on prior to the bid opening. The formula the committee used was not the more commonly used formula, but it was reasonable and rational and it was fairly applied to the bids in this case. There is no rule or policy of HRS or of the Department of General Services (DGS) that mandates that a particular formula be used in awarding points for the rental rate criterion 1a. There is a formula that HRS and DGS recommend as guidance of a methodology that is appropriate and reasonable, but the recommendation is not binding on the committee or on the District Administrator. There was another criterion of associated moving costs considered as part of the associated fiscal costs. Each committee member awarded 10 points to Wharton and 8 points to Curtis on this item. Wharton received 10 points because it sent a letter with its bid in which it offered to pay all moving costs incurred by HRS in a move to its building. Curtis received 8 points because HRS already occupied two of its buildings and would have limited moving costs in moving into the two additional buildings included in its bid. The bid specifications and bid package contained no indication that a bidder could offer to pay all moving costs as part of its bid. In fact, Wharton submitted its letter offering to pay all moving costs as a result of its discussion with one committee member, T.C. Little. Mr. Little is also the General Services Manager for HRS District 3 and is involved with all bids in the district. Mr. Little interpreted the bid specifications to permit such an offer even though the bid specifications were silent on the issue. At page 5 of the bid package, it is clearly stated that questions concerning the bid are to be directed to the project contact person. It further states: Any questions which might be prejudicial to other bidders will be answered in writing in the form of a clarification to the bid and will be sent to all prospective bidders. On that same page, the bid specifications address proposal of alternatives by stating: For evaluation purposes each bid submitted will be evaluated as to adherence to the specifications requested. If a bidder desires to propose alternatives to the specified specifications, he/she may do so by attaching a sheet to the bid submittal document titled Alternatives. However, these alternatives will not be presented to the bid evaluation committee for use in comparison of bids and can only be considered after an award of bid is made. The project contact person was Donald J. Cerlanek and any request for clarification should have been addressed to him and not to Mr. Little. Mr. Little's gratuitous advice and interpretation of the bid specifications made to Wharton and not to all bidders was incorrect, violated the terms of the bid specifications, and was improper. The bid specifications do not permit an offer to pay all moving costs to be considered in the award of points under the associated moving costs criteria. Such an offer can only be considered as an alternative proposal and cannot be considered by the bid evaluation committee in comparing the bids. Under the standards established by the committee, Wharton should have received 5 points on the associated moving costs criterion instead of 10 points. The committee members individually evaluated each bid and awarded points within the parameters they had established. Except for the incorrect award of points on the associated moving costs criteria, the scoring method and award of points by each committee member was rationally and reasonably related to the relative importance of each criterion as established in the bid package and was neither arbitrary nor capricious. Each committee member came to the conclusion that the Curtis bid was the lowest and best based on the award of points in each member's independent evaluation. On February 13, 1990, they recommended in writing that Curtis be awarded the bid. On February 19, 1990, the District Administrator adopted the committee's recommendation and reported the recommendation to Steven Gertel, the assistant staff director for HRS Facilities Services in the Office of General Services. On March 7, 1990, Mr. Gertel sent a memo to the District Administrator. The memo said: Review of the bid evaluation committee's recommendation has disclosed that the committee used a non-standard method of evaluating present value of rental rate for the lease term. Please provide an explanation of this variation to accepted practice. In fact, the committee used the established DGS formula to calculate the present value of rental rates. However, the committee used its own formula to award points based on the present value of rental rates. There was nothing impermissible about the committee's actions or formula. Because of a fear of a bid protest, Ms. Casey, the District Administrator, sent a notice rejecting all bids on the project. No other reason was articulated for rejecting all bids. The fear of a bid protest is not a legally sufficient reason to reject all bids, particularly because it is not stated in the bid specifications and is based on speculation about a future event which may never occur. HRS did reserve the right to reject all bids in the bid package, but it may not do so for an improper purpose. Fear of a bid protest is not a proper purpose. Wharton alleged and attempted to show some level of collusion between Curtis and Mr. Cerlanek of HRS. While Mr. Curtis had several contacts with Mr. Cerlanek about the project, such contacts are not per se inappropriate because Mr. Cerlanek is the District 3 Lease Coordinator and is the proper person to discuss future projects with potential bidders. No competent, substantial evidence was presented to show that Mr. Cerlanek discussed anything that was not public record or anything that gave Mr. Curtis any advantage in the bid process. Mr. Cerlanek did not tell Mr. Curtis what would be in the bid package or what would be needed to insure award of the bid to Curtis.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health and Rehabilitative Services enter a Final Order awarding the bid in Lease No. 590:5133 to Gail Curtis, as Trustee, as the lowest and best bidder. DONE and ENTERED this 27th day of September, 1990, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of September, 1990. APPENDIX TO THE RECOMMENDED ORDER IN CASE NOS. 90-2459BID AND 90-2666BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Wharton 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2-4(5) and 19(27). 2. Proposed findings of fact 1, 5, 11-17, 20, 29, 30, 38, 39, 45, 46, 51, and 57 are subordinate to the facts actually found in this Recommended Order. 3. Proposed findings of fact 6, 8-10, 18, 21, 24, 25, 27, 31-34, 37, 40-44, 48- 50, 52, and 55 are irrelevant. Proposed findings of fact 7, 28, 56, 58, and 59 are unsupported by the competent, substantial evidence. Proposed findings of fact 22, 23, 26, 35, 36, 38, 47, 53, and 54 are mere summaries of testimony and are not appropriately framed as proposed findings of fact. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Curtis, as Trustee Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 4(11), 7&8(13), 9(14), and 15(25). Proposed findings of fact 1-3, 5, 6, 10-12, and 16-26 are subordinate to the facts actually found in this Recommended Order. Proposed findings of fact 13, 14, and 27-29 are unnecessary. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Department of Health and Rehabilitative Services Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: Part I paragraphs 2(1&2), 3(4), 4(8), 5(30), Part II paragraphs 2(1&2), 3(3), 4(4), 5(8), 6(9), 8(10), 19(25), and 20(26). Proposed findings of fact Part I paragraphs 1 and 6 and Part II paragraphs 1, 7, 9, 10, 12-18, and 21-24 are subordinate to the facts actually found in this Recommended Order. Proposed finding of fact 11 is irrelevant. Copies furnished to: Robert A. Sweetapple Attorney at Law 465 East Palmetto Park Road Boca Raton, FL 33432 Harry R. Detwiler, Jr. Attorney at Law Holland & Knight Post Office Drawer 810 Tallahassee, FL 32302 Gloria Fletcher Attorney at Law 515 North Main Street, Ste. 300 Gainesville, FL 32607 Frances S. Childers District Legal Counsel Department of HRS 1000 Northeast 16th Avenue Gainesville, FL 32609 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (3) 120.53120.57255.25
# 2
CARMON S. BOONE vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-004900BID (1988)
Division of Administrative Hearings, Florida Number: 88-004900BID Latest Update: Jan. 05, 1989

Findings Of Fact Prior to June, 1988, HRS determined that it needed 32,000 square feet of office space to house some of its indigent social services for southern Escambia County. Since the desired office space is greater than 2,000 square feet HRS was required to competitively bid lease number 590:1984. Towards that end, Respondent prepared an Invitation to Bid and a bid submittal package. The package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Specific areas of importance to Respondent in the selection of its office space were: client safety one building to house all its units employee morale moving costs traffic flow within the building public access Many of the above areas were important to HRS since the agency would render indigent services to approximately 17,000 people a month, many of whom are handicapped or lack good mobility due to age or infirmity. Employee morale was important because of high employee burn out due to rendering aid to so many people who have so little and supplying a pleasant environment conducive to the work of the employees. Moving costs were important should HRS be required to find other space to operate in while necessary remodeling took place in the selected building, or be required to incur the expense of moving to a new building. 1/ All of the above areas were covered by one of Respondent's weighted bid evaluation criteria. The District Administrator of HRS, Chelene Schembera, is ultimately responsible for bidding, selection and leasing of all HRS facilities within District I, including Escambia County, Florida. In order to accomplish this task, Ms. Schembera appointed a bid evaluation committee to review and grade the responsive bids under the criteria established in the bid package, and to recommend to her the committee's choice of the lowest and best bid. Ms. Schembera's purpose in establishing the bid evaluation committee was to secure a cross section of input from people who had a variety of backgrounds and knowledge that would be material in evaluating the office space under the uses for which it was intended and the relative public worth of the work space. Ms. Schembera appointed individual who were familiar with the type of work to be done in the proposed space, as well as a persons familiar with the bid process. Ms. Schembera assigned to serve on the committee Charles Bates, Deputy District Administrator; Jim Peters, to provide a fiscal and overall administrative perspective as well as bid expertise; two citizens from the District Advisory Council to assure objectivity and to look at the properties from the perspective of a private citizen; Mamun Rashied, a program manager; Darlene McFarland, a program manager; Cherie Neal, a unit supervisor and program worker; and Stacey Cassidy, a clerical employee. Ms. Schembera did not personally know Cherie Neal or Stacey Cassidy. These staff members were designated by the supervisors upon Ms. Schembera's direction that she wanted persons who were both intelligent and respected by their peers. One private citizen member of the committee did not participate. The committee as constituted showed a great deal of thought on Ms. Schembera's part to ensure the objectivity of the bid process she was engaging in and to ensure the maximum amount of input from persons who had experience relevant to the overall review of the proposed real estate and to the decision they were being asked to make. The selection of the bid evaluation committee members was neither an arbitrary nor capricious act on Ms. Schembera's part. In fact, the evidence demonstrated the merit in constituting the committee as she did for the input she sought. The bid evaluation committee members, minus Mr. Bates, were briefed on their duties by Joe Pastucha, Facilities Services Manager. Mr. Pastucha is part of the staff responsible for the bid process at HRS. He provided these committee members with the weighted bid evaluation criteria found at page 15 in the bid package. He also gave the committee members a copy of Chapter 5 of the HRS manual containing guidelines for the bid process. His verbal instructions on specific procedures to follow in the evaluation process were limited since he did not wish to improperly influence the committee members. On July 20, 1988, HRS received three bids responding to its invitation to bid on Lease Number 590:1984. Bid A was submitted by Phillips and Company, the apparent second lowest bidder and Intervenor in this case. Its property consisted of one multi-story building located at 1740 North Palafox Street, Pensacola, Florida. Bid B was not responsive and therefore was not considered by HRS and is not a part of this litigation. Bid C was submitted by Petitioner Carmon S. Boone, and was the apparent low bid. Mr. Boone's property consisted of two buildings located at 401 and 411 North Baylen Street, Pensacola, Florida. The Boone property is the present location of Respondent's offices. Both Bid A and Bid C were within the mandatory geographical area designated in the bid package. Once the bids were received the bid evaluation committee began its work. The committee members, minus Mr. Bates, visited the Phillips property. However, the members did not visit the Boone property. There was no need. Four of the members currently worked at the Boone property and the other members had previously visited the Boone property on various other occasions. Mr. Bates was likewise already familiar with both properties. All members were sufficiently familiar with the cogent aspects of each property to allow them to make a rational decision. The bid evaluation committee, minus Mr. Bates, met as a group to evaluate each property in accordance with the weighted bid evaluation criteria. Each individual scored their sheets separately and the general consensus was supportive of recommending the Phillips property. Five committee members scored Mr. Phillips' property higher than the Boone property. The one exception was Mr. Peters who felt that HRS could not support a bid awarded for other than monetary reasons, i.e., he felt the lowest bid had to be accepted. Mr. Bates later reviewed all the bid synopsis sheets of the committee members and discussed the bid award with Mr. Peters and Mr. Pastucha. Mr. Bates felt that the Phillips property was the lowest and best bid. At about the same time, the staff responsible for providing technical assistance to the committee and the District Administrator were made aware that the general consensus of the committee was leaning towards the second lowest bidder, Phillips and Company, as the lowest and best bid. The staff members, one of whom was a bid committee member, disagreed with the award of the bid to Phillips and Company because the Boone property was the lower bid. The staff members sought to head off the committee's intended recommendation. The staff personnel held a meeting with some of the committee members in order to get them to join in a recommendation to Ms. Schembera of the Boone property. Mr. Boone was invited and attended the meeting. He was allowed to improperly bolster his bid by agreeing to convert the two buildings to one and other lesser additions. /2 The potential decision was discussed, but no committee member changed his or her mind. However, through a total lack of communication, a run away staff somehow rationalized themselves into a position of being authorized to submit a letter for Ms. Schembera's signature which awarded the Boone property the lease. Ms. Schembera became aware of her staff's attempt to subvert the bid process she had established. She refused to sign the letter submitted by the staff. She removed the staff member of the committee as a voting member. The staff member had supported the Boone property. She also removed a committee member who supported the Phillips property as a voting member. Ms. Schembera feared that her staff had improperly influenced this member to such an extent that his objectivity had been affected. Both members could still participate in committee discussions. Ms. Schembera thereby reasonably ensured the ongoing objectivity of the bid evaluation committee. The committee was reconvened, minus one member. It recommended the Phillips and Company property. Every reason given by the individual committee members for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. Each individual member gave a rational and reasonable basis for the scoring he or she used on the bid synopsis score sheets. The scoring was done by each member after discussion of the two buildings and without influence from the other committee members. In essence, the committee felt that the Phillips property was the better property for the money. The Phillips property allowed working units to be located in one area with each such unit having its own access. It provided flat safe parking areas and sidewalks, bigger and more elevators, wide halls and windows which presented a bright, happy and pleasant working environment. The Boone property was in two buildings which could not accommodate co-located working units with their own access no matter how much remodeling took place. Parking and sidewalks are on a hill which is slippery when wet. It had one small elevator and narrow halls which did not adequately accommodate more than one wheel chair, and one ground floor where no windows could ever be remodeled into the building leaving a dark, dingy and unpleasant environment. Importantly, every committee member except for the staff member came to the conclusion that the Phillips and Company property was the lowest and best bid. There is no statutory or rule requirement that one scoring method be preferred over another. The only requirement is that the method be rational and reasonable especially where highly subjective, but legitimate criteria are involved in the selection of a particular piece of property. On these facts, the individual scoring methods used by the individual committee members were not arbitrary and capricious, but were very rational and reasonably related to the relative importance the committee members gave the above factors. After reviewing and considering information from the bid evaluation committee, the information on the bid synopsis sheet, and the oral recommendations of Mr. Bates, Mr. Peters and Mr. Pastucha, Ms. Schembera concluded that the Phillips property was vastly better, even considering costs. She found it to be materially superior in terms of construction, organization, client accessibility, handicap accessibility, repairability (in terms of walls), and maneuverability for clients and staff. She felt the Phillips' building's qualities would offer more "humanity" to the process of serving the Department's clients. Additional facts she considered when making her decision included the morale of the staff and their productivity; the ability of staff and clients to conduct their business in a reasonably pleasant, comfortable, safe, and easy to understand and comprehend environment; and the desire to provide a minimally adequate work space. In addition to other monetary costs, she considered energy costs and life cycle costs as reflected on the bid synopsis sheet. The bid synopsis sheet defined minimal energy and life cycle costs to be anything less than 55 BTU's per square feet per year. In this case, the Boone property reflected 39.5 BTU's per square feet and the Phillips property reflected 53.5 BTU's per square feet. Both properties were under the 55 BTU cutoff established by HRS. Translated into monetary figures (life cycle costs) the Boone property reflected a cost of $26,735.00 and the Phillips property reflected a cost of $41,160.00. It was the difference between the energy figures which caught Ms. Schembera's eye. In her layman's opinion, it was incomprehensible that the two buildings would have such a wide divergence of energy costs. /3 She learned from her staff that the information used to compute these costs was supplied by the bidders who had vested interests in the outcome. Ms. Schembera concluded the cost difference was minimal and not of overriding concern in relation to the physical characteristics of the two buildings and how they compared to each other. She quite correctly felt the two buildings were not comparable. In essence, the two buildings' differences in design location and construction rendered neither building comparable to the other building as a like facility under Section 255.254, Florida Statutes. 4/ Based on that information she gave the energy figures relatively little weight. More importantly, however, before the final bid award was made by HRS, the Division of General Services within HRS in its failsafe role in reviewing bids considered the life cycle cost figures of the two bids. The minimal language of Section 255.254, Florida Statutes, has been interpreted by HRS to mean that anything under 55 BTU's is minimal and except in one instance not applicable here, numerical differences under 55 BTU's are immaterial. The Division, without getting into the issue of the likeness of the facilities, concluded that both bids met the Department's interpretation of the "minimal" language of Section 255.254, Florida Statutes, and the relative numerical difference in the energy costs was immaterial. Ms. Schembera is entitled to rely on other more expert HRS Division staff to ensure a proper analysis of highly technical bid specifications such as the energy cost analysis required under Section 255.254, Florida Statutes. It does not matter that the review took place after Ms. Schembera had made her preliminary decision. What is important is that the review be made either personal or vicariously through staff before the final award is made. A proper review of energy costs was, therefore, made by Respondent before the final award was made. Likewise, Ms. Schembera's ultimate decision that the buildings were not comparable like facilities was a proper review of energy costs even though that conclusion was arrived at through a layman's unsophisticated, but more accurate intuition and common sense. To that extent, the energy cost data had no impact on the ultimate choice made by the District Administrator and were properly considered by the District Administrator. 5/ A letter for Ms. Schembera's signature adopting the committee's recommendation was drafted by Mr. Pastucha. The letter was signed and sent to the Department's Division of General Services for review. The District was requested to provide additional justification for its choice by the Department's Division of General Services. Mr. Rashied was directed to draft the response. He simply reorganized the original memorandum into a format more compatible with the Division's direction, clarified a few points and without significantly changing the content, submitted the response as directed. The Division acquiesced in Ms. Schembera's decision.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Health and Rehabilitative Services enter a final order dismissing Case NO. 88-4900BID, and awarding lease number 590:1984 to Phillips and Company as the lowest and best bidder. DONE and ORDERED this 5th day of January, 1989, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of January, 1988.

Florida Laws (5) 120.53120.57255.25255.254255.255
# 3
AUTO MACHINE AND PARTS COMPANY, INC. vs. DEPARTMENT OF TRANSPORTATION, 86-002508BID (1986)
Division of Administrative Hearings, Florida Number: 86-002508BID Latest Update: Aug. 14, 1986

The Issue In this case, Petitioner has challenged Respondent's choice of responsive low bidders related to bid solicitation for contracts pertaining to four classes of diesel engine rebuild programs. In particular, Petitioner alleges that in all four classes the low bidder, and in two instances, the second low bidder, in settings in which the Petitioner was second low bidder or third low bidder respectively, have failed to meet specifications and are not entitled to the award of contracts. Petitioner asserts that it can meet the terms of the contract and was prepared to meet those contract terms upon the Respondent's opening of the bids. Petitioner questions Respondent's failure to confirm that each prospective bidder was capable of meeting each specification within the bid solicitation document prior to bid opening or, at the latest, at the point when the bids were opened. Concomitantly, Petitioner contends that it was inherently unfair for the Respondent to confirm the ability of the low bidders to comply with the specifications following bid opening and in the face of challenges to the qualifications of the apparent low bidders offered by unsuccessful bidders.

Findings Of Fact The State of Florida, Department of Transportation, invited bids from forty firms related to a program for rebuilding certain diesel engines owned by the Department. These firms were initially seen to have the necessary expertise to provide the rebuild service. There were 16 specific types of engines which the Department wished to have rebuilt pursuant to separate contracts. There was a seventeenth category which dealt with miscellaneous types of engines described as "others." The bid document set forth that those individuals who were interested in submitting bids for the diesel engine rebuild program must be able to comply with a number of requirements. Among those requirements was the requirement in the section of the bid documents pertaining to engine rebuild specifications which, under the subsection for parts and services, indicated that "the Contractor must rebuild the engine according to the Original Equipment Manufacturer's (OEM) rebuild procedures and specifications." Furthermore, the bidders were to comply with certain facility requirements, which were: * * * The Contractors facility must have the following minimum machine equipment and tools: Vat-type hot tank for engine block cleaning Magnaflux machine (minimum 2000 amp hr) Connecting rod reconditioners Pin boring machine Flywheel surfacer Cylinder boring and honing equipment Engine block align boring machine Surfacer for heads and blocks Dynomometer OEM specified service tooling for engine series quoted OEM service manuals for engine series quoted It was noted in the specifications pertaining to necessary facility requirements that the machinery must have the capacity to perform the work on the engines that were specified in the bid solicitation. Finally, it was a requirement that the subcontracting work meet this restriction: All machine and rebuilding work must be performed in the Contractors shop, with the exception of fuel pump and fuel injector rebuilding, and crankshaft and camshaft grinding. Requirements set forth in the previous paragraph did not indicate whether it was necessary for the bidder to have the service items on hand at the time that the bid responses were offered, at the time the bid opening was conducted, or at the point at which a written contract was entered into between the Department and a successful bidder or before commencing the work. The assumption on the part of the Department employee who was responsible for the bid solicitation process was to the effect that bidders would be considered in compliance with these requirements if they were able to comply with all conditions at the point at which the contract documents were executed between the successful bidder and the Department or before service work commenced. This interpretation was given by Mark Sawicki, who was responsible for arranging to have the Department's diesel engines rebuilt. Sawicki did not feel that any attempt at prequalification by inspection of the forty prospective bidders was in the best interests of the Department. He felt that an attempt at prequalification of forty potential bidders was an extravagance which the Department could not afford. Having described the requirements that the Department had in mind through the bid document, Sawicki assumed that the contractors whom he had preselected without inspecting their facilities could meet specifications if they responded to the bid solicitation. When the bids were opened on June 17, 1986, eleven separate bidders had responded to the invitation. Some of the bidders responded to each category of engine sought for contract and others responded to select categories. Petitioner offered its response to all but one category of engines. It was not the apparent low bidder in any category. In its protest, Petitioner has questioned the Department's intent to award contracts to the apparent low bidders in the engine classes number 3208, number 1150, number 1160 and the miscellaneous category described as "others." The apparent low bidder in the engine class number 3208 was Coastal Power. In the miscellaneous class of engines, the apparent low bidder was First Coast Truck. In those two engine classes, the Petitioner was shown to be the second low bidder. In the engine class numbers 1150 and 1160, the apparent low bidder was Coastal Power, the second low bidder in those engine categories was Zabatt and Petitioner was the third low bidder. Sawicki made an inspection of the facilities of Coastal Power on June 19, 1985, and confirmed that the low bidder had the requisite facility to comply with the requirements of the bid document pertaining to machinery, etc. for the engine classes in dispute. Sawicki also confirmed that the Zabatt facility met requirements. Inspection of Zabatt was made on June 19, 1986. Although the Dynomometer available to Zabatt was in a facility next door, the Dynomometer would be operated only by personnel from Zabatt and was accessible to Zabatt routinely. After bids were opened, another employee from the Department made similar efforts at confirmation of the acceptability of the facility at First Coast to rebuild the miscellaneous class of engine. The president of First Coast Truck has also given an indication of its equipment in correspondence addressed to the Department on July 10, 1986. It was not established at what point in time these companies were first able to meet the requirements related to facilities and equipment, whether it be at the point of offering their responses to the bid advertisement, at the point of bid opening or on the day that the facilities were inspected by employees of the Department. Obviously, these bidders could have met the bid requirements for facilities and equipment prior to contracts' being completed between the successful bidders and the Department, in that contracts have not been executed pending the outcome of this hearing. No competent evidence was presented which identified what equipment Petitioner had on hand to comply with the bid requirements or when the equipment was acquired.

Florida Laws (2) 120.53120.57
# 4
FSM, INC. vs DEPARTMENT OF CORRECTIONS, 94-001350BID (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 14, 1994 Number: 94-001350BID Latest Update: May 11, 1994

The Issue The issue for determination in this proceeding is whether a contract for a perimeter security system at Calhoun Correctional Institution and Holmes Correctional Institution should be awarded to Intervenor.

Findings Of Fact On January 19, 1994, Respondent issued an Invitation To Bid, Bid No. 94-INST-6197, the ("ITB"). The ITB requested bidders to submit bids to supply materials for perimeter security systems and to provide training for the installation and maintenance of the systems at Calhoun Correctional Institution and Holmes Correctional Institution. Responsive bids had to include materials and training necessary for Respondent to install and maintain the security systems. Bids had to be filed no later than February 10, 1994. Petitioner and Intervenor submitted bids along with three other bidders in a timely manner. The ITB required bidders to hold a Florida alarm contractor's license. Intervenor does not hold such a license. However, the ITB defines the term "bidder" to include an individual, firm, partner, or corporation. Intervenor's bid contemplated that it will supply the materials required in the ITB. Another company that holds a Florida alarm contractor's license will provide the training required for Respondent to install and maintain the security systems. Intervenor and the other company responded to the ITB as partners in a single bid that provides a single price for all materials and training required by the ITB. Intervenor's bid complies with the terms of the ITB and is responsive. Respondent notified Intervenor of its intent to award the contract to Intervenor as the lowest responsive bidder. Intervenor's bid is approximately $14,000 less than Petitioner's bid. Petitioner is the second lowest bidder. Respondent's interpretation that the ITB allows materials and training to be supplied separately by Intervenor and its partner is a reasonable interpretation that is neither arbitrary nor capricious. The intent and purpose of such an interpretation is to encourage flexibility that may result in savings to the state. The provision of materials and services by separate companies in Intervenor's bid will, in fact, result in substantial savings to the state. The terms of the bid does not create an unfair advantage for Intervenor. The term bidder is defined in the bid documents to include a partner and a corporation. Florida law expressly exempts Intervenor from the requirement for an alarm contractor's license if Intervenor merely supplies materials and does not fabricate or consume the materials in performing the work of a contractor. Section 489.503(10), Florida Statutes. Therefore, only Intervenor's partner is required to hold an alarm contractor's license, and, in fact, Intervenor's partner holds the requisite license. Respondent's interpretation of the ITB is consistent with applicable law. Any other interpretation of the ITB by Respondent would have purported to impose a stricter licensing requirement than that imposed by the legislature.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner's written formal protest be DENIED. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 26th day of April, 1994. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1994. APPENDIX Petitioner's Proposed Findings of Fact 1.-5., 7-8. Accepted in substance 6. Irrelevant and immaterial Rejected as recited testimony Accepted in substance 11.-13. Rejected for the factual and legal reasons stated in the Recommended Order Respondent's Proposed Findings of Fact All of Respondent's proposed findings of fact are accepted in substance. COPIES FURNISHED: Beth Atchison, Esquire Assistant General Counsel Florida Department of Corrections 2601 Blair Stone Road Tallahassee, FL 32399-2500 Teresa Hurtado Schaefer, CEO FSM, Inc. 3559 S. W. 69th Way Miramar, FL 33023 Harry K. Singletary, Jr. Secretary Department of Corrections 2601 Blairstone Road Tallahassee, FL 32399-2500 Louis A. Vargas, Esquire General Counsel Department of Corrections 2601 Blairstone Road Tallahassee, FL 32399-2500 Michael G. Kanche, Jr. Southwest Microwave 2922 South Rosevelt Street Tempe, Arizona 85282-2042

Florida Laws (4) 120.57120.68287.042489.503
# 5
DERICK PROCTOR vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 93-000263F (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 25, 1993 Number: 93-000263F Latest Update: Oct. 04, 1994

The Issue The issue in this cause is whether costs and attorney's fees are due Petitioner, hereinafter PROCTOR, from Respondent, hereinafter HRS, pursuant to Section 57.111, Florida Statutes, as a result of Division of Administrative Hearings Case Number 91-5963-BID, and, if so, the amount of costs and fees.

Findings Of Fact The petition for fees and costs herein is brought exclusively under Section 57.111, Florida Statutes, and relates back to a bid protest wherein PROCTOR and TCC #3 LTD., INC., hereafter TCC, were the only bidders on HRS lease 590.236. PROCTOR was the protestant/Petitioner and TCC was the apparent successful bidder/Intervenor in Derick Proctor v. Department of Health and Rehabilitative Services, DOAH Case No. 91-5963BID. HRS' Invitation to Bid (ITB) for lease 590:236 required bidders to submit evidence of control of the property being offered, including the parking areas. Evidence of control could take the form of a deed for the property, an option to purchase the property, or a lease or option to lease showing a right to sublease. TCC did not submit a document labelled "deed," "option to purchase," "lease," or "option to lease" with its bid. TCC submitted as its evidence of control a contract for sale and purchase of the property with Hernando Plaza, Ltd., executed by Edward M. Strawgate and Harold Brown representing themselves to be general partners of the limited partnership. At all times material, the actual record title of the property submitted by TCC for the bid was in the Victor and Lillian Brown Foundation. At the times of the bid opening, evaluation, and August 27, 1991 notice of intended award, HRS had no reliable information as to what entity actually owned the property offered by TCC, and TCC had not disclosed to HRS that its contract to purchase the property was with an entity other than the record owner. Up to then, at least, Hernando Plaza, Ltd. had represented itself to TCC as being the owner of the property. The ITB did not require an abstract of title to be submitted with the bid. HRS normally does not require an abstract from successful bidders, although the ITB contained provisions for future disclosures from successful bidders. Absent some reason to "go behind" facial evidence of control, HRS' ITB attempted at the time to protect HRS by requiring successful bidders to post an irrevocable letter of credit to be forfeited in the event a successful bidder could not perform and for future disclosures concerning the chain of title. (See the recommended order in the underlying case). HRS accepted the contract to purchase the property from Hernando Plaza, Ltd. as TCC's required evidence of control, believing it to constitute an option to purchase. (See Findings of Fact 15-17 infra, this final order). On August 27, 1991, PROCTOR received from HRS a notice of intent to award the bid to TCC. This notice constituted the "window" for protests, if any, to be filed. PROCTOR then timely filed a notice of intent to protest and a formal written protest of the award to TCC. The filing of this protest resulted in an automatic suspension of the bid solicitation and contract award process and referral of the matter to the Division of Administrative Hearings, pursuant to Section 120.53(5)(c), Florida Statutes. This protest formed the basis of the underlying bid case, DOAH Case No. 91-5963BID. No later than the time of the Prehearing Order of September 23, 1991 in Case No. 91-5963BID, the law firm of Gibbs and Rudzik had made known to the hearing officer and counsel for both PROCTOR and HRS its retention as counsel for TCC. TCC moved for leave to intervene in a motion filed September 30, 1991, which was granted in an order of October 4, 1991. In a letter of October 10, 1991, counsel for PROCTOR made counsel for HRS aware of a question of whether TCC could obtain good title to the property. Counsel for PROCTOR proposed in a letter of October 14, 1991 to counsel for HRS that HRS reject both PROCTOR's and TCC's bids and rebid the lease, but this letter was primarily devoted to determining if HRS wished to interpose a new defense that PROCTOR's bid was unresponsive. In the instant fees and costs case, PROCTOR relies on its October 14, 1991 letter as the point from which HRS should have acted to avoid incurring attorney's fees and costs. After the receipt of the two letters, HRS did not reject both bids and rebid the contract but proceeded to formal hearing on October 30, 1991. PROCTOR and HRS share the mutual impression that had HRS accepted PROCTOR's proposal to reject both bids, HRS would have to have allowed TCC an opportunity to protest that decision. At the final hearing in Case No. 91-5963BID, evidence was offered that Hernando Plaza, Ltd. had a conditional option to purchase the property from the record title owner, the Brown Foundation. However, it was not established at the hearing that the conditions of the option had been fulfilled or that TCC or Hernando Plaza, Ltd. could otherwise gain good title to the property through a valid option. It was concluded as a matter of law in Case No. 91-5963BID, that on its face, the ITB stated that control could be evidenced merely by attachment of an "option to purchase," that the ITB stated no further requirements concerning the internal provisions of the option to purchase, and that TCC's conditional contract for purchase constituted a conditional option to purchase. The conditions of the option to purchase and the chain of title, among myriad other matters were subjects of proof at the formal hearing. The conditions of the option to purchase and various complicated real property concepts arising from recorded and unrecorded parts of the chain of title constituted the thrust of the recommended order's assessment that TCC's "control" was speculative only. It is here noted that the totality of the "chain" of title might have been unavailable even by "abstract" due to the lack of recordation of some documents. The lengthy formal hearing adduced evidence concerning the factual issue of whether or not the conditional option to purchase was between TCC and an entity which had such a sufficiently unequivocal interest in the proposed property that it could convey title to TCC in time for TCC to fulfill its obligations under its proposed lease to HRS. There is no evidence that HRS knew of these problems on August 27, 1991, when it gave notice of its intent to award the bid to TCC. Hernando Plaza, Ltd. was the entity with which TCC had contracted. At formal hearing, TCC relied on the legal concept that all interests in the property had merged in the non-title holder, Hernando Plaza, Ltd. This concept, together with recorded and unrecorded elements in the chain of title which were presented at formal hearing, were determined in the recommended order to be too "speculative" on the issue of TCC's control. However, it was also found, upon evidence submitted at formal hearing, that TCC's bid contained no other material deviations from the requirements of the ITB, that the signator of TCC's bid had sufficient status to submit the bid for the TCC corporation, and that TCC's signator could not submit the bid as an agent of the owners of the real property. TCC and its bid signator had never purported to have submitted the bid on behalf of the owners of the real property. (See the recommended order of the underlying bid case.) These issues were raised by PROCTOR and they addressed more than just the facial compliance of TCC's original bid documents which was all HRS had to consider when it made its initial decision in favor of TCC and against PROCTOR. However, the recommended order found HRS to have materially deviated in a number of ways from the bid process in its initial evaluation of PROCTOR's bid, not the least of which was determining that PROCTOR had complied with the ITB requirements for demonstrating control. All such evaluation flaws had been committed by HRS in favor of PROCTOR. Both TCC's and PROCTOR's bids were ultimately found to be unresponsive in the recommended order entered on December 20, 1991. The recommended order also found both had standing to be involved in the bid protest and formal hearing. The recommended order recommended rejecting both bids and readvertising the ITB. The Final Order of HRS entered on January 20, 1992 dismissed PROCTOR's protest on the basis that he lacked standing to protest, as his bid was unresponsive, and awarded the bid to TCC. HRS did not give PROCTOR notice that his bid was not responsive until it issued its Final Order. The Final Order of HRS was appealed to the First District Court of Appeals by PROCTOR. The First District Court of Appeals entered an order on June 22, 1992 finding PROCTOR had standing and remanding the case back to HRS for the purpose of a decision of the issue of whether TCC's bid was also unresponsive. On July 27, 1992, HRS entered its Amended Final Order determining both bids to be unresponsive and that the lease should be relet for bids. The First District Court of Appeals affirmed the Amended Final Order of HRS in a per curiam opinion without discussion on October 13, 1992. HRS did not reject both bids and rebid the contract until after this per curiam opinion. No motion for rehearing was filed with respect to either of the First District Court of Appeals' orders entered June 22 or October 13, 1992, nor was any notice to invoke the discretionary jurisdiction of the Supreme Court filed. PROCTOR did file a motion for rehearing solely on the court's denial of PROCTOR's motion for appellate fees. Mandate was issued by the Clerk of the First District Court of Appeals on December 3, 1992. HRS entered an Order Directing Release of Bid Protest Cost Bond on December 18, 1992, in which HRS stated: Petitioner, Derick Proctor, has prevailed in the above styled bid protest. Petitioner's domicile and principal place of business is Vero Beach, Florida. Petitioner has one employee. Petitioner is a sole proprietorship. Petitioner's net worth does not exceed $2,000,000.00. HRS was not a nominal party in the underlying bid case. HRS did not initially challenge PROCTOR's "small business party" status in this instant fees and costs proceeding. Therefore, that allegation of the fees and costs petition is not at issue. Also, Petitioner's "small business party" status is now stipulated to exist. The parties have stipulated that the maximum statutory fee is $15,000.00 and that $15,000.00 is a reasonable fee if an award of attorney's fees is due. HRS has not protested or objected to the amount of costs claimed, $411.25, if costs are due.

Florida Laws (4) 120.53120.57120.6857.111
# 6
K AND M PINE STRAW vs DEPARTMENT OF CORRECTIONS, 11-001670BID (2011)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 04, 2011 Number: 11-001670BID Latest Update: Jul. 27, 2011

The Issue The issue in this proceeding is whether the award of a bid for the sale of scrap metal to Cumbaa Enterprises, Inc. was arbitrary, capricious, clearly erroneous, or contrary to competition or the bid specifications.

Findings Of Fact On January 19, 2011, the Department issued Invitation to Bid (ITB) #10-Apalachee-8252. The ITB was a revenue- generating contract for the sale of scrap metal at Apalachee Correctional Institution in Sneads, Florida. Since the contract would generate revenue to the State, the Department’s purpose was to award the contract to the highest responsive bid and developed bid specifications and criteria to accomplish that goal. The specifications for the ITB stated in relevant part: Material Deviations: The Department has established certain requirements with respect to bids to be submitted by bidders. The use of shall, must or will (except to indicate simple futurity) in this ITB indicates a requirement or condition which may not be waived by the Department except where the deviation therefrom is not material.[emphasis added]. A deviation is material if, in the Department’s sole discretion, the deficient response is not in substantial accord with this ITB’s requirements, provides an advantage to one bidder over other bidders, has a potentially significant effect on the quantity or quality of items bid, or on the cost to the Department. Material deviations cannot be waived and shall be the basis for rejection of a bid. Minor Irregularity: A variation from the ITB terms and conditions which does not affect the price of the bid or give the bidder an advantage or benefit not enjoyed by other bidders or does not adversely impact the interests of the Department. 1.10 Responsive Bid: A bid submitted by a responsive and responsible vendor that conforms in all material respects to the solicitation. * * * 4.3.1 Submission of Bids Each bid shall be prepared simply and economically, providing a straightforward, concise delineation of the bidder’s capabilities to satisfy the requirements of this ITB, fancy bindings, colored displays, and promotional material are not desired. Emphasis in each bid must be on completeness and clarity of content. In order to expedite the review of bids, it is essential that bidders follow the format and instructions contained in the Bid Submission Requirements (Section 5), with particular emphasis on the Mandatory Responsiveness Requirements. Rejection of Bids The Department shall reject any and all bids containing material deviations. The following definitions are to be utilized in making these determinations. Material Deviations The Department has established certain requirements with respect to bids to be submitted by bidders. The use of shall, must or will (except to indicate simple futurity) in this ITB indicates a requirement or condition which may not be waived by the Department except where the deviation therefrom is not material. A deviation is material if, in the Department’s sole discretion, the deficient response is not in substantial accord with the ITB’s requirements, provides an advantage to one bidder over other bidders, has a potentially significant effect on the quantity or quality of items bid, or on the cost to the Department. Material deviations cannot be waived and shall be the basis for rejection of a bid. Minor Irregularities A variation from the ITB terms and conditions which does not affect the price of the bid or give the bidder an advantage or benefit not enjoyed by other bidders or does not adversely impact the interests of the Department. As indicated, Section 5 of the specifications outlined the contents of the bid. Section 5 stated in relevant part: SECTION 5 - CONTENTS OF BID This section contains instructions that describe the required format for the submitted bid. Bids shall be submitted in a sealed envelope, clearly marked “Bid - ITB#- Apalachee-8252”. . . . . [T]he following paragraphs contain instructions that describe the required format for bid responses. Responsiveness Requirements The following terms, conditions, or requirements must be met by the bidder to be considered responsive to this ITB. Failure to meet these responsiveness requirements may cause rejection of a bid. [emphasis added]. Bidder shall complete, sign and return the ITB Bidder Acknowledgement Form (page 1 & 2). The bidder must return either the original or a copy of both pages with an original signature on page one (1). The bidder shall complete, sign, date, and return (all) pricing pages, entitled Cost Information Sheet, which consists of page 28. By submitting a bid or bids under this ITB, each bidder warrants its agreement to the prices submitted. The Department objects to and shall not consider any additional terms or conditions submitted by a bidder, including any appearing in documents attached as part of a bidder’s response. In submitting its bid, a bidder agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Any qualifications, counter-offers, deviations, or challenges may render the bid un-responsive . . . . * * * 5.3 Certificate of Insurance Bidders shall return a fully executed Certificate of Insurance . . . . In this case, Section 5.1 contains two bid specifications essential to a bid's responsiveness. Those two requirements were submission of a signed and completed, original or copy, of the bidder acknowledgement form and submission of a completed Cost Information Sheet. The Cost Information Sheet is not at issue here. The bidder acknowledgement form is a double-sided Department of Management Services form containing general boilerplate contractual language. The back of the form is a continuation of standard contractual terms from the front. Oddly, signatures acknowledging these terms and the terms of the ITB are on the front page (page 1) of the form. By signing the front page of the bidder acknowledgement form the bidder agrees to abide by all conditions of the bid. The remainder of Section 5 of the ITB contains bid specifications that are not considered essential to determine the initial responsiveness of the bid at the bid opening, but are to be returned at some later point in time after the bid's are opened. However, the language of Section 5 effecting that intent is unclear. In particular, the bid specification contained in Section 5.3 requires the bidder to "return" an "executed" Certificate of Insurance. The Certificate of Insurance provides the Department with proof of a variety of required insurance coverage of the vendor. However, later in the ITB Section 7.14 clarifies that the Certificate of Insurance need only be supplied with the later-signed contract documents. Section 7.14 states, in relevant part: 7.14 Contractor's Insurance The contractor shall not commence any work in connection with this ITB . . . until he has obtained all of the . . . types of insurance and such insurance has been approved by the Department. The Department shall be furnished proof of coverage of insurance by Certificates of Insurance . . . accompanying the contract documents and shall name the Department as an additional named insured [emphasis added]. Indeed, the evidence demonstrated that the Department has long interpreted these provisions to require a winning bidder to provide Certificates of Insurance at the time a contract is entered into and not as part of the essential requirements of the bid due at bid opening. While the Department could (and probably should) clarify this provision, its interpretation of its bid specifications is not unreasonable under these facts. In this case, five bids were timely submitted in response to the ITB, including those of K & M and Cumbaa. On March 8, 2011, the Department opened bids for the ITB. Cumbaa submitted the highest bid for the contract, at $22,197.48. K & M submitted the next highest bid at $20,001.00. At the bid opening, Cumbaa's bid included a Cost Information Sheet, a copy of the signed front page of the bidder acknowledgement form, and the Contact for Contract Administration form known as Attachment 1. However, the bid did not contain the second side of the bidder acknowledgement form or a Certificate of Insurance form at the time the bid was opened. K & M's bid contained the same documents as Cumbaa's bid, as well as the second side of the bidder acknowledgement form and a number of certificates of insurance for K & M. The evidence showed that Cumbaa did not include the Certificate of Insurance form in its sealed bid upon the advice of the Department that the form was not required at bid opening. However, Cumbaa had insurance coverage in place at the time of the bid opening and faxed its certificates of insurance to the Department on March 10, 2011. Given these facts and the Department's reasonable interpretation of its ITB, the omission of Cumbaa's certificate of insurance was neither required at the time of the bid opening, nor material to the award of the bid. The omission of the second page of the bidder's acknowledgement form was not noticed by anyone reviewing the bids until its omission was pointed out by K and M in this bid protest. Cumbaa faxed a copy of the back side of the document to the Department on April 11, 2011. Clearly, this lack of notice demonstrates the immateriality of the back side of the bidder's acknowledgement form. Additionally, since the signatures of both bidders were on the front page of the form submitted by them and those signatures bound the bidders to the terms of the ITB, there was no evidence that demonstrated why submission of a copy of the back side of the form was material to the award of this bid. Ultimately, the Department reviewed the bids for responsiveness and determined that Cumbaa was the highest responsive bid. On March 11, 2011, the Department posted its intent to award the bid to Cumbaa Enterprises, Inc. As indicated, there was no evidence that the omission of these two documents from the Cumbaa bid were material deviations from the bid specifications since neither omission impacted the ultimate contract requirements and did not materially impact the integrity of the bid process. Indeed, the insurance certification was not required for responsiveness under Section 5.1 of the bid under a long-standing and reasonable interpretation of that requirement by the Department. For these reasons, this bid protest should be dismissed.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent, Department of Corrections, enter a final order dismissing the Protest of K & M Pine Straw. DONE AND ENTERED this 1st day of July, 2011, in Tallahassee, Leon County, Florida. S DIANE CLEAVINGER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of July, 2011. COPIES FURNISHED: Kurt Eldridge K and M Pine Straw 20583 John G Bryant Road Blountstown, Florida 32424 Edith McKay, Esquire Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Edwin G. Buss, Secretary Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Jennifer Parker, General Counsel Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500

Florida Laws (4) 120.569120.57120.687.14
# 7
D. C. COURTENAY vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-004317BID (1989)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Aug. 10, 1989 Number: 89-004317BID Latest Update: Jun. 08, 1992

The Issue Whether the Department of Health and Services acted fraudulently, arbitrarily, capriciously, illegally or dishonestly in issuing an award of bid or HRS Lease No. 590:2069 to Harpaul S. Ohri.

Findings Of Fact Sometime before March, 1989, the Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide social services in the western portion of Orlando, Orange County, Florida, including a food stamp distribution office. HRS was authorized to procure, through competitive bidding, a lease for 17,250 net rentable square feet of existing office space, plus or minus 3 percent. The said lease was to provide for a full service period of seven years and two options to renew for three years each at specified rates, with occupancy no later than December 1, 1989 or 175 days after the bid award is finalized. The geographic area designated in the bid package for the office space was limited to the following area of Orange County, Florida: Beginning at the intersection of Colonial Drive and Kirkman Road to the intersection of L.B. McLeod Road, then east on L.B. McLeod Road to the, intersection of Rio Grande Avenue then north on Rio Grande Avenue to the, intersection of Colombia Street,, then east on Colombia Street to Interstate 4, then north on Interstate 4 to the intersection of Colonial Drive, then west on Colonial Drive to the point of Beginning. Public notice that HRS was seeking competitive bids was given and HRS prepared a document entitled Invitation to Bid for Existing Office Space (ITB), which set forth in detail all of HRS requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. Specific areas of importance to Respondent as reflected in the ITB and addressed by the evidence herein were as follows: 17,250 net rentable square feet (plus or minus 3 percent) of existing office space. General office use for use, as a client service center. Seven year term with two options to renew of three years each. 120 off-street, on-site, full size parking spots designated exclusively for use of Department employees and clients, suitably paved and lined, with a minimum of two for the handicapped. Availability of public transportation within reasonable proximity. Availability to adequate dining facilities within two miles. Photographs of the exterior front of the facility, along with documentation of present facility configuration and parking areas including access and egress to public roadways. Availability of elevator for multi-story use. i). Space requirement criteria: Minimum telephone requirements. Back-up interior emergency lighting. Three separate sets of rest rooms, male and female, one meeting the needs of the handicapped General security requirements. Specific security requirements for food stamp distribution center. Window covering over exterior widows to allow both sunlight and energy control; if bidded space without existing windows, then all rooms comprising the exterior of the building would require windows measuring approximately 24 x 36, all secured and inoperable. Full Service including all utilities and janitorial. The evaluation factors and their relative weights were stated in the ITB as follows: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease Evaluated using present value methodology by application of the present value discount rate of 8.69 percent. (Weighting: 25) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 10) Associated moving costs, i.e., furniture, equipment, telephone systems, etc,. (Weighting: 5) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 10) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 10) Facility Susceptibility of design of the space offered to efficient layout and good utilization. (Weighting 15) Provision of the aggregate square footage in a single building. Proposals will be con- sidered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100 percent The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Sealed bids were submitted by three bidders, Petitioner, Harpaul S. Ohri and Kensington Gardens Builders Corp. The bids were opened on April 25, 1989, and Ernie Wilson, HRS District 7 Facilities Services Manager, determined that all three bids were responsive, and within the mandatory geographical area designated in the bid package. The District Administrator appointed a bid evaluation committee to review and grade, the responsive bids under the criteria established in the bid package, and to recommend to him the committees choice of the lowest and best bid. Four individuals who were familiar with the type of work to be done in the proposed space and familiar with the bid process were appointed to the Committee. On or about May 1, 1990 the bid evaluation committee determined that the bid of Harpaul S. Ohri was the "lowest and best bid" and submitted its determination, in writing, to the District Administrator who, subsequently approved the selection. On or about June 26, 1989, on behalf of the Department, Ernie Wilson, Facilities Services Manager, notified the bidders of the Departments intent to award the bid to Harpaul S. Ohri, as being in the best interest of the Department. The bid evaluation committee consisted of four representatives of the Department who visited two of the three bidders sites and questioned the bidders representatives. The members of the committee were familiar with the Petitioners site from previous experience. They choose not to make an on-site visit prior to completing the bid evaluation sheet, although instructed to do so on the Evaluation Committee Duties and Responsibilities/Real Property, Leasing instruction sheet. Each committee member completed an evaluation sheet and gave a higher total score to Mr. Ohri. The three major bid evaluation criteria were Fiscal Cost, Location and Facility. Under the Fiscal Cost criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioner received an average of 22.7 points out of 30 possible,, while Ohri received 21.7, and Kensington Gardens received 23.7 points. The points were individually assessed by the evaluation committee, after the rental rates were compared by Ernie Wilson based on the present value analysis of bidders proposed rates. For Renewal Rates, each of the bidders, including Petitioner, received 5 points out of 10 possible. The present value analysis was not applied, as was noted in the ITB. However, even a cursory examination of the renewal rates submitted by the bidders shows that there is a 15 percent to 33 percent yearly differential in the rates, with the Petitioners rates as the lowest and Kensington Gardens as the highest. Although the committee assigned all three bidders an equal rating, the renewal rates submitted by the bidders were not equal should the Department wish to exercise its options, the rates submitted by Petitioner were substantially lower than the other two bidders and would result in a cost savings to the Department of several hundred thousand of dollars. The award factor points should not have been awarded equally. For Moving Costs, Petitioner received 5 points on each of the committee members sheets, while Ohri received 4 points and Kensington Gardens received, an average of 3.7 points. The maximum points possible was 5 points. Petitioner was awarded the maximum points because HRS is presently in the same building and no moving costs would be experienced. The other two bidders were awarded 4 points each by committee members. That determination was based on each members personal experiences. No cost or time lost data was provided or requested. The LOCATION criterion also had three sub-categories: Proximity to other governmental agencies - 10 points - with all three bidders receiving the same rating; Public Transportation -10 points - with all three ,bidders, receiving the same rating; and Environmental Factors - 10 points - out of which Petitioner received an average of 5.7 points; Ohri - 9.7 points and Kensington Gardens - 6.5 points. In considering the proximity to other governmental agencies of each of the facilities being considered, the committee relied on their own knowledge of the area. They determined that since each was within the geographical area designated in the ITB, each was equally distant from the most frequently visited government agencies in the vicinity. However, Petitioners facility is the most centrally located of the three facilities offered, while the two other facilities were considerably distant from other government agencies. The award factor points should not have been awarded equally. For Public Transportation, the committee determined that local bus service went near each of the three facilities. They were neither provided, nor did they request, route maps, schedules or passenger capacity for buses servicing each facility. Petitioners facility is centralized in the area served within the bid district, and serviced by, numerous bus lines which pass near the facility ten times per hour. The bus service to the other two facilities are limited to four buses per hour, with buses having a smaller capacity. In addition, most clients would be required to travel to the central bus terminal and transfer to a different route in order, to reach the Ohri or Kensington Gardens facilities, making bus transportation a very time-consuming process. No other form of transportation is available, except for taxi service. In addition, in order for a client to walk from the nearest bus stop to the Ohri facility, a person would cross two heavily traveled six lane streets and then walk across an open shopping center parking lot. This would require approximately a fifteen minute walk. In order to reach Petitioners facility, a client would require approximately a five minute walk utilizing public sidewalks. The committee did not consider these facts in its evaluation. The award factor points should not have been awarded equally. (c)(1). For Environmental Factors, the committee considered each buildings physical characteristics and the surrounding area. The committee, in their letter to the District Administrator, dated May 1, 1989, identified this category as "a very critical area for the new lease." The letter also stated: "The committee took the following into account when evaluating this section: Cleanliness of the building aid surrounding areas. Lack of traffic congestion by motorized vehicles close to the facility. Easiness of getting to and from the facility by vehicle. Safety for clients and staff walking to and from the facility. Upkeep of the surrounding buildings or other sections of the bidders building." The following was also taken into account when evaluating this section, but was not so stated in the letter. At least one committee member believed the lack of window space in Petitioners facility was disabling to his bid, and that the willingness of the Ohri representative to install windows on exterior walls was a significant factor in her determination of award. At least one committee member indicated that future expansion was a substantial factor in her favoring the Ohri bid, and that there was janitorial and security problems at Petitioners facility. The committee received no other information other than the committee members opinion regarding the same. The committee as a whole erroneously believed that the extra square footage visible at the Ohri facility at the time of their inspection would necessarily be available to HRS if and when it might expand its offices. Future expansion was specifically removed from the ITB at the pre-bid conference and it was clearly erroneous for them to have included this factor in their bid evaluation. The ITB specifically calls for the installation of exterior windows by the winning bid prior to occupancy. However, none of the committee members reviewed the ITB or the actual bids submitted. They relied primarily on the synopsis of the bids prepared by Ernie Wilson. The ITB states substantial general and specific security requirements in detail; however, the evaluation criteria forms do not provide a category for evaluating security other than generally under the sub-category of environmental factors. The ITB, under General Specifications and Requirements, called for the availability of adequate dining facilities within two miles of the proposed facility. The evaluation criteria did not provide a category for the committee to rate dining facility availability. In consideration of the environmental factors, the committee overlooked or failed to consider a hazardous unfenced high voltage transmission station adjacent to the Ohri facility. In addition, the photographs submitted by Ohri as the front of the building (as required by the ITB) are in fact the rear of the building which was not offered as part of the proposed leased facility. Of the three sub-categories under FACILITY, out of 15 possible points, Petitioner received an average rating of 9.5, Ohri received an average of 13.7 and Kensington Gardens received 11.2 for Layout/Utilization. Ohri received the most points because his building configuration was a, shell and was more flexible and could be reconfigured for more efficient layout to suit the Departments needs. All three bidders submitted proposals wherein the total square footage of rentable space was to be contained in a Single Building. Therefore, all three bidders received the maximum 10 points. A maximum 5 points was provided for facilities with Street-level space. All three bidders were awarded the maximum 5 points. However, a portion of Petitioners space was offered on the second floor, a fact which the committee overlooked. The Petitioner should not have received the full 5 points for having street-level space. The unanimous recommendation of the evaluation was to award the lease to Ohri. In reaching that conclusion, the committee did not properly utilize the weighted bid criteria and, in addition, included improper bid considerations in their evaluation of the three facilities. Some of the reasons given by the committee for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. However, others were erroneous and improper.

Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a Final Order rejecting all bids for lease number 590:2069 and issue a new invitation to bid. DONE AND ENTERED this 12th day of February, 1990, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1990. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Proposed Findings of Fact submitted by the Petitioner: Accepted: paragraphs 1, 2, 3, 5, 6, 7, 9 (in substance, except for subparagraphs f, g, j and k which are not relevant), 10 (in substance), 12(a), (b), (f-in substance), (g-in substance), (h-in substance), (j), (k-in substance), (l-in substance), (p-in substance). Rejected: Not relevant: paragraphs 4, 12(c), (d), (e), (m), (n), (o), (p- the proposed future location of the Greyhound Station; insure wooded area nearby), (q), (r). Argument: paragraphs 11 and 13. Procedural matters, covered in the preliminary statement: paragraphs 8 and 14. Respondent did not submit proposed findings of fact. COPIES FURNISHED: Terrence W. Ackert, Esquire 201 East Pine Street Suite 1402 Orlando, Florida James Sawyer, Jr., Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (4) 120.53120.57255.249255.25
# 8
MARPAN SUPPLY COMPANY, INC. vs DEPARTMENT OF MANAGEMENT SERVICES, 96-002777BID (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jun. 11, 1996 Number: 96-002777BID Latest Update: Nov. 26, 1996

The Issue The issue for determination is whether Respondent acted fraudulently, arbitrarily, illegally, or dishonestly in selecting Intervenor as the lowest bidder for a contract to supply the state with lamps valued at $3,692,499.

Findings Of Fact The Parties Respondent is the state agency responsible for soliciting bids to establish a contract for the purchase of large lamps by state agencies and other eligible users. Petitioner is a Florida corporation and the incumbent vendor under similar contracts for the preceding 10 years. Petitioner does not manufacture lamps. Petitioner sells lamps manufactured by Osram-Sylvania ("Sylvania"). Intervenor is an Ohio corporation doing business in Florida. Intervenor manufactures the lamps it sells. The ITB On March 15, 1996, Respondent issued Invitation To Bid Number 39-285- 400-H, Lamps, Large, Photo and STTV (the "ITB"). The purpose of the ITB is to establish a 24 month contract for the purchase of Large Lamps (fluorescent, incandescent, etc.), Photo Lamps (audio visual, projection, flash), and Studio, Theatre, Television, and Video Lamps ("STTV") by state agencies and other eligible users. The contract runs from July 10, 1996, through July 9, 1998. The ITB estimates the contract price at $3,692,499. The ITB contains General and Special Conditions. General Conditions are set forth in 30 numbered paragraphs and elsewhere in DMS Form PUR 7027. Special Conditions are set forth in various unnumbered paragraphs in the ITB. General Conditions Paragraphs 5, 11, and 24 of the General Conditions are at issue in this proceeding. The terms of each paragraph are: 5. ADDITIONAL TERMS AND CONDITIONS: No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and effect and are inapplicable to this bid. If submitted either purposely through intent or design or inadvertently appearing separately in transmittal letters, specifications, literature, price lists, or warranties, it is understood and agreed the general and special conditions in this bid solicitation are the only conditions applicable to this bid and the bidder's authorized signature affixed to the bidder's acknowledgment form attests to this. 11. QUALITY ASSURANCE: The contractor, during the contract term, upon mutual agree- ment with the Division of Purchasing, will provide reasonable travel and lodging accommodations for one (1) to three (3) government employees to perform an on-site inspection of the manufacturing process(es) and review of the manufacturer's product quality control(s) and total quality manage- ment program(s). The contractor will reim- burse the State for actual transportation cost, per diem and incidental expenses as provided in Section 112.061, F.S. It is the State's desire that the contractor provide demonstration of quality control for improvement rather than post production detection. 24. FACILITIES: The State reserves the right to inspect the bidder's facilities at any reasonable time with prior notice. Included Items Special Conditions in the ITB require bidders to submit prices for "Item 1" and "Item 2" lamps ("included items"). 1/ Item 1 lamps consist of Group 1 and 2 lamps. Group 1 lamps are Large Lamps such as fluorescent, incandescent, quartz, mercury vapor, metal halide, and high-pressure sodium lamps. Group 2 lamps are Photo Lamps such as audio visual, projection, flash, and STTV lamps. The total price for each group is multiplied by a weighted usage factor. The product calculated for Group 1 is added to the product calculated for Group 2 to determine the total price for Item 1 lamps. Item 2 consists of a category of lamps described as "T- 10 Lamps." The total price for Item 2 lamps is determined without application of the weighted usage factor used for Item 1 lamps. The total price for Item 2 lamps is a de minimis portion of the contract price. Special Conditions in the ITB require Respondent to award a single contract for included items to a single bidder. Special Conditions state that, "During the term of the contract established by this bid, all purchases of items will be made from the successful bidder." 2/ Excluded Items Special Conditions require that, "The bidder shall offer a fixed discount from retail prices on all excluded items." Excluded items include high technology lamps. The requirement for a fixed discount on excluded items is not considered in evaluating bid prices for included items. Rather, the requirement is intended to reduce the state's cost for both included and excluded items by assuring a meaningful discount on excluded items. Formatting Requirements Special Conditions prescribe the format in which bids must be submitted. Price lists and authorized dealers' lists are required to be submitted in hard copy and on computer diskette. The format prescribed for computer diskette includes requirements for font and graphics. The Special Conditions state that, "Failure to comply with this requirement will result in disqualification of your bid." The Bids The ITB prohibits the alteration of bids after they are opened. Respondent opened bids on April 10, 1996. Seven vendors submitted bids in response to the ITB. Included Items Four vendors, including Petitioner, submitted a bid for both Item 1 and Item 2 lamps. Intervenor and two other bidders did not submit a bid for Item 2 lamps. General Conditions Intervenor deleted paragraphs 11 and 24 of the General Conditions from its bid. At the direction of Intervenor's legal department in Cleveland, Ohio, Intervenor's regional sales manager struck through paragraphs 11 and 24 and initialed the deletions. The deletions are consistent with Intervenor's corporate policy. Intervenor routinely objects to contract provisions requiring inspection of Intervenor's facilities. Excluded Items Petitioner's bid includes a fixed discount of 44 percent on excluded items. Intervenor's bid includes a fixed discount of 0 percent. Formatting Requirements Intervenor included the information required by the ITB on the diskette it submitted with its bid. However, Intervenor supplied the information in Courier 12 characters per inch ("cpi") font, not the Courier 10 cpi font prescribed in the ITB. Proposed Agency Action Respondent determined that Intervenor's bid was responsive. The purchasing specialist for Respondent who reviewed each bid to determine if it was responsive failed to observe the deleted paragraphs in Intervenor's bid. The purchasing specialist forwarded those bids determined to be responsive to the purchasing analyst assigned by Respondent to: determine if the lamps offered in each bid met the specifications prescribed in the ITB; and evaluate bid prices. The purchasing analyst noted that paragraphs 11 and 24 were deleted from Intervenor's bid. The purchasing analyst and purchasing specialist conferred. They determined that paragraph 5 of the General Conditions cured Intervenor's deletions without further action. The purchasing analyst correctly determined: that lamps offered by Petitioner and Intervenor met ITB specifications; that Intervenor's bid is the lowest bid for Item 1 lamps; that Petitioner's bid is the second lowest such bid; and that Petitioner's bid is the lowest bid for Item 2 lamps. Petitioner's bid for Item 1 lamps is approximately five percent greater than Intervenor's bid. Respondent proposes to award one contract for Item 1 lamps to Intervenor. Respondent proposes to award a second contract for Item 2 lamps to Petitioner. At 4:00 p.m. on May 20, 1996, Respondent posted its intent to award the contract for Item 1 lamps to Intervenor. Petitioner timely filed its formal protest on June 3, 1996. Respondent did not award a contract for excluded items. Respondent's failure to award a contract for excluded items is not at issue in this proceeding. Arbitrary Respondent's proposed award of a contract to Intervenor for substantially all of the items included in the ITB is a decisive decision that Respondent made for reasons, and pursuant to procedures, not governed by any fixed rule or standard prescribed either in the ITB or outside the ITB. Respondent's proposed agency action is arbitrary. Excluded Items The requirement for bidders to offer a fixed discount on excluded items operates synergistically with the requirement for Respondent to award a single contract on included items to a single bidder. The combined action of the two requirements operating together has greater total effect than the effect that would be achieved by each requirement operating independently. The requirement for a fixed discount on excluded items, operating alone, may not induce a bidder who could receive a contract solely for Item 2 lamps to offer a discount that is as meaningful as the discount the bidder might offer if the bidder were assured of receiving a contract for Item 1 and 2 lamps upon selection as the lowest bidder. 3/ By assuring bidders that a single contract for Item 1 and 2 lamps will be awarded to a single bidder, the ITB creates an economic incentive for bidders to provide a meaningful discount on excluded items. Respondent frustrated the synergy intended by the ITB by applying the requirements for a fixed discount and for a single contract independently. Respondent penalized the bidder conforming to the requirement for a fixed discount on excluded items by awarding only a de minimis portion of the contract to the bidder. Respondent rewarded the bidder not conforming to the requirement for a fixed discount on excluded items by awarding substantially all of the contract to that bidder. If Respondent elects to purchase all excluded items from Petitioner, Respondent will have used the contract for Item 1 lamps to induce a meaningful discount from Petitioner without awarding Petitioner with the concomitant economic incentive intended by the ITB. Such a result frustrates the ITB's intent. Paragraph 5 Respondent's interpretation of paragraph 5 fails to explicate its proposed agency action. Respondent's interpretation of paragraph 5: leads to an absurd result; is inconsistent with the plain and ordinary meaning of the terms of the ITB; and is inconsistent with Respondent's actions. Respondent's interpretation imbues paragraph 5 with limitless curative powers. Respondent's interpretation empowers paragraph 5 to cure the deletion of all General Conditions in the ITB whether stricken by pen or excised with scissors. Respondent's interpretation of paragraph 5 would transform a bid containing no General Conditions into a responsive bid. Respondent's interpretation of paragraph 5 is inconsistent with the plain and ordinary meaning of its terms. Paragraph 5 operates to cure "additional" terms. It does not operate to restore deleted terms. Respondent's interpretation of paragraph 5 is inconsistent with Respondent's actions. Respondent did not rely on paragraph 5 to cure Intervenor's deletions without further action. Respondent took further action to cure the deletions. Further Action On the morning of May 20, 1996, the purchasing analyst for Respondent telephoned Intervenor's regional sales manager. The purchasing analyst demanded that Intervenor accept the conditions Intervenor had deleted from its bid by submitting a letter of acceptance before the bid tabulations were posted at 4:00 p.m. on the same day. The regional sales manager contacted Intervenor's corporate headquarters in Cleveland, Ohio. Intervenor authorized the regional sales manager to accept the deleted paragraphs. By letter faxed to Respondent at approximately 3:20 p.m. on May 20, 1996, Intervenor accepted the paragraphs it had previously deleted. The letter stated that, "GE Lighting [will accept] the Contract Conditions noted in Paragraphs 11 and 24 of the Lamp Quotation." [emphasis not supplied] At 4:00 p.m. on May 20, 1996, Respondent posted the bid tabulation form. The bid tabulation form stated that the "award is contingent upon General Electric's acceptance of all the terms in conditions (sic)" in the ITB. Respondent argues that the purchasing analyst who contacted Intervenor on the morning of May 20, 1996, exceeded her authority. Respondent characterizes the word "contingent" in the bid tabulation form as "poorly written" and a "bad word." Agency Construction Of ITB Terms Respondent construes terms in the ITB in a manner that is inconsistent with their plain and ordinary meaning. The ITB requires that, "The bidder [shall] offer a fixed discount from retail price list on all excluded items." [emphasis supplied] Respondent interprets the quoted provision as meaning the bidder may offer such a fixed discount if the bidder elects to do so. The purpose of the ITB is to establish "[a] 24 month contract" to supply large lamps to the state. [emphasis supplied] Respondent interprets the quoted provision as meaning that the purpose of the ITB is to establish two contracts. The ITB states that, "During the term of the contract established by this bid, all purchases of items [will] be made from [the] successful bidder." [emphasis supplied] Respondent interprets the quoted provision as meaning that purchases of some items will be made from one successful bidder and that purchases of other items will be made from a second successful bidder. The ITB states that the contract "[shall] be made statewide on an all or none basis" to the responsive bidder who satisfies the conjunctive requirements for: "[the] lowest "Award Figure Item (1; [and] lowest Award figure for Item (2." [emphasis supplied] Respondent interprets the quoted provision as meaning that separate contracts may be made statewide on less than an all or none basis to separate responsive bidders who satisfy the disjunctive requirements for either the lowest bid for Item 1 lamps or the lowest bid for Item 2 lamps, or both. The ITB requires offers to be submitted for all items listed within a group for a bid to qualify for evaluation. Respondent interprets the requirement as meaning that a bidder who does not qualify for evaluation for all of the groups in the contract nevertheless qualifies for evaluation for the contract. Finally, the ITB states that failure to comply with the formatting requirements for the diskette "[will] result in disqualification of your bid." [emphasis supplied] Respondent interprets the quoted language to mean that failure to comply with prescribed formatting requirements may result in disqualification of a bid. The interpretations of the quoted terms proposed by Respondent, individually and collectively, frustrate the purpose of the ITB. They also ignore material requirements of the ITB. Material Deviation Respondent deviated from the rule or standard fixed in the ITB in several respects. First, Respondent altered the bid evaluation procedure prescribed in the ITB. Second, Respondent ignored the requirement to award a single contract to a single bidder. Third, Respondent ignored the requirement that bidders provide a fixed discount on excluded items. Fourth, Respondent ignored the requirement to comply with the formatting requirements prescribed in the ITB. Each deviation from the rule or standard fixed in the ITB is a material deviation. Each deviation gives Intervenor a benefit not enjoyed by other bidders. Each deviation affects the contract price and adversely impacts the interests of Respondent. 4/ 5.5(a) Benefit Not Enjoyed By Others Intervenor enjoyed a benefit not enjoyed by other bidders. Intervenor obtained a competitive advantage and a palpable economic benefit. Respondent altered the bid evaluation procedure prescribed in the ITB. On the morning of May 20, 1996, Respondent disclosed the bid tabulations to Intervenor alone, 5/ gave Intervenor an opportunity that lasted most of the business day to determine whether it would elect to escape responsibility for its original bid, allowed Intervenor to cure the defects in its bid, accepted Intervenor's altered bid, and conditioned the bid tabulations on Intervenor's altered bid. Respondent used a bid evaluation procedure that is not prescribed in the ITB and did not allow other bidders to participate in such a procedure. 6/ In effect, Respondent rejected Intervenor's initial bid, with paragraphs 11 and 24 deleted, and made a counter offer to Intervenor to accept a bid with paragraphs 11 and 24 restored. Intervenor accepted Respondent's counter offer. Respondent excluded other bidders from that process. Respondent gave Intervenor an opportunity to determine whether it would elect: to escape responsibility for its original bid by declining Respondent's counter offer; or to perform in accordance with an altered bid by restoring paragraphs 11 and 24. A bidder able to elect not to perform in accordance with its bid has a substantial competitive advantage over other bidders unable to escape responsibility for their bids. 7/ Respondent awarded substantially all of the contract to Intervenor even though Intervenor failed to provide a meaningful discount on excluded items. Respondent provided Intervenor with a palpable economic benefit. 5.5(b) Bid Price And Adverse Impact On The State Respondent did not award a contract for excluded items. Respondent's proposed agency action allows Respondent to purchase excluded items from either Intervenor or Petitioner. If Respondent were to purchase all of the excluded items it needs from Intervenor, Respondent could pay substantially more for excluded items than Respondent would save from the five percent price advantage in Intervenor's bid for Item 1 lamps. In such a case, Respondent's proposed agency action would effectively increase costs to the state that are inherent, but not stated, in the ITB. 8/ Conversion of incorrectly formatted data to the required font shifts prices to incorrect columns and causes other problems in accessing information in the diskette. Such problems can not be rectified easily but require substantial time and effort. Responsive Bidder Respondent did not award the contract intended by the ITB to the lowest responsive bid. Although Intervenor's bid is the lowest bid for Item 1 lamps, it is not the lowest responsive bid for Item 1 and 2 lamps. Petitioner's bid is the lowest responsive bid for Item 1 and 2 lamps. 9/ Respondent is statutorily required to award the contract to the lowest responsive bidder. 10/ Illegal Intervenor's bid is not responsive within the meaning of Sections 287.012(17), Florida Statutes (1995). 11/ It does not conform in all material respects to the ITB. Intervenor's unaltered bid deletes paragraphs 11 and 24. It does not include a fixed discount on excluded items, does not include a bid for Item 2 lamps, and does not conform to the formatting requirements in the ITB. Section 287.057 requires Respondent to award the contract to the bidder who submits the lowest responsive bid. Respondent has no authority either: to consider bids that are not responsive; or to award the contract to a bidder other than the lowest responsive bidder. Respondent's attempt to engage in either activity is ultra vires and illegal. Minor Irregularities The ITB encourages, but does require, bidders to include quantity discounts for Item 1 and 2 lamps. Petitioner's bid does not include quantity discounts. Petitioner's bid does not fail to conform to material requirements in the ITB. Petitioner does not manufacture Item 1 and 2 lamps. Sylvania manufactures the lamps Petitioner sells. Petitioner has no legal right to require Sylvania to allow inspection of its facilities pursuant to paragraph 11 of the General Conditions. Petitioner's ability to provide the requisite inspections requires the cooperation of Sylvania. Petitioner's bid requires payment by the state within 30 days of an invoice. Section 215.422 and the ITB provide that Respondent has 40 days to issue warrants in payment of contract debts and that interest does not accrue until after 40 days. The defects in Petitioner's bid are minor irregularities within the meaning of Florida Administrative Code Rule 60A-1.001(16). 12/ They neither affect the bid price, give Petitioner a competitive advantage, nor adversely impact Respondent's interests. Petitioner has the practical ability to arrange inspection's of Sylvania's facilities. Petitioner is legally responsible for failing to do so. Respondent's employees have never visited Sylvania's facilities during the 10 years in which Petitioner has been the contract vendor to the state. The requirement for payment within 30 days does not obviate the provisions of Section 215.422. Private contracts can not alter mutually exclusive statutory provisions.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order granting Petitioner's protest of Respondent's proposed agency action. RECOMMENDED this 26th day of September, 1996, in Tallahassee, Florida. DANIEL S. MANRY, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of September, 1996.

Florida Laws (6) 112.061120.57215.422287.001287.012287.057 Florida Administrative Code (1) 60A-1.001
# 9
INTERNATIONAL INTERIORS, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-005617BID (1987)
Division of Administrative Hearings, Florida Number: 87-005617BID Latest Update: Jan. 27, 1988

Findings Of Fact On or about October 28, 1987, the Department of Health and Rehabilitative Services (HRS) mailed its Invitation To Bid (ITB) No. 88-32BC to prospective bidders. According to the Special Bid Conditions of ITB No. 88- 32BC, the stated purpose of the ITB was "to obtain competitive bid prices from Vendors/Contractors for the purchase and installation of Open Office Partitions/Furnishings and related accessories for use by the department's ABUSE REGISTRY, located in the East Wing, 2729 Fort Knox Blvd., Tallahassee, Florida 32308." Included among the responses to the ITB were bids by International Interiors, Inc., (International), by Perdue Office Interiors, Inc., (Perdue), by Executive Office Supply, Inc. (Executive), and by Haworth. The construction of the future HRS office space in the East Wing of 2729 Fort Knox Blvd. was coordinated between the owner and HRS to accommodate the needs of the HRS Abuse Registry. The space will be used by qualified HRS personnel and support staff to receive and maintain telephone reports of child abuse and related complaints. HRS consulted with the owner's architect to determine the ultimate floor plan of the HRS space in the building and then consulted an interior design expert to determine how HRS could best utilize the space for the purposes of the Abuse Registry through these efforts, HRS designed an office interior consisting of a system of partitions and furniture. The interior design was reduced to a blue print or design drawing specifying gross dimensions as well as the particular dimensions of offices, partition panels, hallways, work space (desk tops), related components of the system and the particular location of building support columns and electrical power poles. The ITB included a design drawing and provided in pertinent part in its Special Bid Conditions: DESIGN: This project has a limited amount of space with fixed walls and fixed dimensions as given on the architectural drawing. Each vendor must guarantee his system will fit into the space without any violation of Florida Building Codes. Design Drawings and a Component Listing have been included in each bid package so that each vendor will have the equal opportunity to evaluate the project as a whole as well as by its parts. All dimensions are listed as nominal dimensions since various manufacturers' component varys [sic] somewhat in exact dimensional sizes. Surface materials and colors will be selected from the successful vendor's line after the award of the bid has been made. SITE EXAMINATION: The area to be used by the Abuse Registry is located on the main floor, east wing, 2729 Fort Knox Blvd., in Tallahassee, Florida 32308. The site has existing walls, columns, door entrances, etc., which will have to be taken into consideration when integrating your open office system into the design scheme. It is the responsibility of the vendor to inspect the premises and familiarize himself with all of these on-site conditions. A floor plan has been provided for reference only, and any specific analysis or dimensioning should be made on site by the vendor. Contact Mr. DeVoe Moore to schedule a tour of the work site. (904) 656-6211. Failure to consider on-site conditions may result in disqualification of the bid. The Technical Specifications provide in pertinent part: All dimensions in this component listing has [sic] been provided for the purpose of fulfilling the overall dimension requirements as shown in the furniture plan. Variations from these will occur between different manufacturer's products. In providing dimensions other than those listed, it is critical to maintain a minimum hall clearance of 4'0" or code requirement and to work within the given permanent walls. (Emphasis added.) International's bid was the lowest at $211,523.96. But HRS disqualified it as nonconforming because cursory review, as well as International's own design drawing furnished with its bid, showed that International's proposal would intrude three feet into a four foot hallway around the perimeter of the office space which is required, and is required to be four feet wide, by the applicable building codes and the State Fire Marshal. HRS' disqualification of the International bid on that ground was erroneous under the facts presented at final hearing. The intrusion of the International proposal into the required hallway was due to International's error in configuring the partition panels for purposes of the design drawing. No other bidder even included a design drawing, which was not required by the ITB. The apparent intrusion of the International proposal into the hallway is easily corrected by swapping 66" partition panels that had been placed along the length of the office space for purposes of preparing International's design drawing with 48" partition panels that had been placed perpendicular to the 66" panels. With this new configuration, the International bid fits into the gross dimensions of the HRS office space without any loss of work space or cabinet space as a result of the reconfiguration. 3/ However, International's Shaw/Walker product has partition panels that are 3" thick. (The ITB calls for partition panels that are at least 2" thick. See Finding Of Fact 15, below.) At least in part for that reason, International cannot fit as much Shaw/Walker furniture into the HRS office space as specified in the HRS design drawing. To fit the Shaw/Walker product into the space, International substituted 42" corner desk tops for the 48" corner desk tops specified in the Technical Specifications of the ITB in 36 of the 60 office cubicles in the design drawing. This results in a loss of 6" of desk top on either side of those corner desk tops, a total of 6 square feet of desk top in each affected cubicle, and reduces the size of those 36 office cubicles from 64 to less than 58 square feet. Neither Executive nor Perdue had to vary from the Technical Specifications, and they will be able to duplicate the HRS design drawing without losing desk top surface area or office cubicle square footage. If it knew it could have put together an acceptable bid offering less work space, Perdue could have done so at a lower cost and therefore at a lower bid price. Under the ITB, the dimensions of the individual components were nominal, but the assembly of components to reproduce the overall dimensions of the furniture plan on the HRS design drawing was a mandatory bid specification. Although it was the lowest in price, International's bid must be disqualified as unresponsive. As between Perdue and Executive, Executive made the lower bid by only approximately $235, $228,000 to $228,235.36. However, Executive's bid departs from the Technical Specifications in several significant respects. The Special Bid Conditions of the ITB provides in pertinent part: SYSTEM QUALITY - BRAND NAMES: It is the intent of the solicitation that the successful bidder provide modular furnishing comparable-in quality to: Haworth Steelcase Shaw/Walker HRS approved equivalent The department considers that the above furnishings establish standards for comparison and identify levels of quality for design of materials, methods of fabrication and assembly. The department retains the right to determine the acceptability of systems not mentioned above. Bidders proposing systems and components as alternates to those identified above must submit a request for pre-qualification to include complete descriptive literature and a list of current installations. (Emphasis added.) Executive pre-qualified the Westinghouse Furniture Systems' Wes Group product which it bid. The Westinghouse furniture generally is comparable in overall quality to the three specified products -- Haworth, Steelcase and Shaw/Walker. However, the Haworth, Steelcase and Shaw/Walker products were specified not only because of their overall quality but also because HRS, through its consultant, understood that they would meet the requirements of the Technical Specifications of the ITB. The ITB does not state or suggest that its Technical Specifications are waived by pre-qualification of an "equivalent" product. HRS had several major concerns, in addition to the furniture design or floor plan, in putting this project out for bid. Due to the number of people who would be doing primarily telephone work in an open office environment, one primary concern was for high quality acoustical panels. Under "Power And Communication Panels," the Technical Specifications of the ITB state in pertinent part: Acoustical fabric panels shall maintain a Noise Reduction Coefficient (NRC) rating of .90 or greater and an STC rating of at least 29. The higher the acoustical rating of a partition panel, the higher its cost. Therefore, if a bidder could reduce the acoustical rating, it could afford to make a more price competitive bid. For that reason, Perdue telephoned HRS' consultant before submitting its bid to ask if the acoustical rating was "critical" and was told that it was. Perdue bid Steelcase product, including partition panels that conform to the requirements of the Technical Specifications instead of its lower cost, lower rated panels. Executive bid partition panels with an NRC rating of only .80 and an STC rating of only 27. Another major concern of HRS was for quality, durable construction so that HRS could expect to get years of satisfactory use of the furniture system it was purchasing. For this reason, the "Power And Communication Panels" section of the Technical Specification also provides in part: "All panels shall have a minimum 2" all-steel frame." Steelcase partition panels meet the specification; Westinghouse panel frames are only 1 1/2" thick. HRS also wanted to be sure that the office furniture system it was purchasing would be able to accommodate the need for its Abuse Registry personnel to work with a variety of electrically-operated equipment, including computer equipment. Under "Electrical Panels," the Technical Specifications of the ITB provide in pertinent part: "Panels shall have the capability of distributing four 20 amp circuits, one isolated; UL listed." The Westinghouse panels Executive bid have the capability of distributing only three 20 amp circuits (without additional electrical components.) Meanwhile, Perdue's bid meets this specification, too. When Perdue telephoned to inquire about the acoustical specification, it also asked if this electrical specification was critical, and the HRS consultant confirmed that it was. Therefore, Perdue bid higher priced panels that meet the specifications instead of lower priced panels comparable to the Westinghouse panels Executive bid. Both Perdue's and Executive's bid had some other minor non- conformities. Perdue's Steelcase overhead cabinets operate by a nylon glide with metal scissor hinge instead of by a ball bearing hinge, as specified, and its panel tackboards are 15 1/2" x 30" instead of 24" x 30", as specified. But Executive's Westinghouse partition panels have adjustable glides on the post by which the panels are connected instead of two adjustable glides on each panel, as specified (assuming panel-to-panel connections). Because it does not meet critical aspects of the Technical Specifications of the ITB, the Executive bid must be disqualified as unresponsive. The Haworth bid also was responsive but was for approximately $270,000, far above the others. Perdue's bid, as the lowest responsive bid, should be awarded the contract.

Recommendation Based on the foregoing Findings Of Fact and Conclusions Of Law, it is recommended that the Department of Health and Rehabilitative Services enter a final order (1) granting the bid protests of both International and Perdue insofar as they protest the award of HRS Bid 88-32BC to Executive on the ground that the Executive bid is unresponsive, (2) denying the International protest insofar as it seeks the award of HRS Bid 88-32BC on the ground that it too is unresponsive, and (3) granting the bid protest of Perdue also insofar as it seeks the award of HRS Bid 88-32BC because Perdue is the lowest responsive bidder. RECOMMENDED this 27th day of January, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of January, 1988.

Florida Laws (4) 120.53287.012287.042287.057