Recommendation Based upon the above findings of fact and conclusions of law it is recommended that the permit requested be issued in accordance with the recommendations and special provisions set forth in the staff report (attached thereto). Respectfully submitted this 3rd day of November, 1975, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of November, 1975. COPIES FURNISHED: Thomas C. Garwood, Jr., Esquire Post Office Box 231 Orlando, Florida 32802 John Wheeler, Esquire Post Office Box V West Palm Beach, Florida
The Issue The issue to be determined is whether the applicants, William Guererro and Christina Bang, a/k/a Christina Guerrero (Applicants), are entitled to issuance of a Consolidated Environmental Resource Permit and State Lands Approvals for various structures on the Applicants’ property at 58458 Overseas Highway, Marathon, Florida.
Findings Of Fact The Parties Petitioners Bernard Spinrad and Marian Spinrad are the owners of adjoining parcels of property with the addresses of 58418 and 58420 Overseas Highway, Marathon, Florida. They acquired the property in December 2001. They recently completed construction of two residential structures on the properties. The structure at 58418 Overseas Highway is currently listed for sale. The structure at 58420 Overseas Highway is a vacation rental property. Neither structure is Petitioners’ permanent residence. The DEP is the state agency with the power and duty to regulate activities in waters of the state pursuant to chapter 373, Florida Statutes. The DEP also serves as staff to the Board of Trustees of the Internal Improvement Trust Fund (“Board of Trustees”) to review and act on activities on state sovereignty submerged lands under chapter 253. The Applicants, are the owners of adjoining parcels of property with the address of 58478 Overseas Highway, Marathon, Florida (the Property). They purchased the Property in June 2010. The structures that are the subject of the Permit are to be constructed near or waterward of the shoreline of the Property. The Property The Property is located on Grassy Key, an island in the middle Florida Keys, within limits of the city of Marathon, Monroe County, Florida. U.S. Highway 1 passes through Grassy Key. The Property -- as is that of Petitioners -- is situated between U.S. Highway 1 and the open waters of the Atlantic Ocean. In the early part of the 20th century, a portion of Grassy Key was platted as the Crains Subdivision. The properties owned by Applicants and Petitioners are within the Crains Subdivision. During the periods of time directly relevant hereto, the Property has been owned by Burgess Levine, who owned the property during the period prior to the October 2006, landfall of Hurricane Wilma until June 2010, and by Applicants, who have owned the Property since June, 2010. Grassy Key Grassy Key is three-miles long, and has 6800 feet of beaches, none of which are designated as critically eroded. The island fronts the Atlantic Ocean to the east, and the more protected waters of Florida Bay to the west. The waters along the Atlantic Ocean shoreline of Grassy Key in the area at issue are shallow, with an extremely flat bottom having a very gradual slope of approximately 1 to 30, meaning there is a one foot vertical change over 30 horizontal feet. The mean tide range at the Property is about 1.7 feet. Under normal conditions, the stretch of Grassy Key at issue is fairly characterized as a zero-wave energy shoreline. Waves break well offshore and there is negligible wave energy propagating beyond that point. What shoreline energy exists is produced by small tide currents and wind-shear on the water surface that moves water along the shoreline. The direction of the water movement is dependent on tides and wind direction, with the predominant direction being from north to south. Erosive and other significant changes to the shoreline of Grassy Key, including that stretch fronting the Property, are event driven, meaning when there is a coastal storm that causes a rise in the water level, substantially higher than the astronomical tide, waves can propagate onto the shoreline of Grassy Key. The wind and waves can come from virtually any direction depending on the storm. A storm of greater intensity will create higher energy-wave conditions. Although storm conditions may only occur over 1 to 3 percent of a given year, with the rest of the year having zero-wave energy, on average the coastline may be considered to be of moderate-wave energy. The beach sediment along the Grassy Key shoreline in all areas pertinent hereto consists of calcareous material, made up of the breakdown of corals and coralling algae, with a significant fraction of other detrital marine material. The upper beaches of Grassy Key, including that on the Property, generally consist of coarse, calcareous sand with a small fraction of calcareous silt-size particles. The inter-tidal areas along Grassy Key consist of predominantly fine calcareous sand, with a greater fraction of calcareous silt. Extending out into the nearshore area all along Grassy Key, including that fronting the properties owned by Petitioners and Applicants, the sediment becomes a very fine calcareous sand, with a greater fraction of the material being calcareous silts and clays, and with a substantial amount of organic mud of a marine origin, classified as Islamorada muck. Since at least the 1970s, one wading in the nearshore waters along Grassy Key could expect to sink into the surface muck to a depth of anywhere from six inches to two feet. The depth of muck becomes less as one moves further out and approaches the offshore Thalassia beds. Although some areas offer more resistance than others, it is routine to experience difficulty in walking and wading along the coast of Grassy Key because of the high percentage of clays and silts in the substrate. The band of muck narrows as one proceeds towards the northern stretches of Grassy Key, until one reaches the furthest areas to the northeast where the nearshore transitions to exposed rock and hard bottom. The surface muck that exists in the nearshore waters of Grassy Key, having a sizable component of decaying organic material, gives off an odor of hydrogen sulfide when disturbed that some find to be unpleasant. The odor is a naturally- occurring condition of the sediment, and is common in mucky areas all around the southern coasts of Florida. The suggestion that the shoreline in the vicinity of the Petitioners’ property, and that of Applicants, was a naturally occurring white, sandy beach is contrary to the greater weight of the evidence. To the extent the shoreline at Petitioners’ property may have been temporarily altered by the overwash from Hurricane Wilma as discussed herein, Petitioners’ own post-Wilma man-made efforts at beach stabilization, or the redistribution of sediments occasioned by Hurricanes Isaac and Sandy in 2012, the evidence demonstrates the “mucky” condition described herein to be more consistent with the natural and long-standing conditions of Grassy Key. Thus, as Grassy Key exists in the present time, one may expect to encounter six inches to two feet of loose muck anywhere along the nearshore area. Close to shore of Grassy Key are scattered beds of Halodule, a species of seagrass that tends to emerge and grow in shallow waters. The growth of Halodule is influenced by the nature of the sediments, the salinity temperature, and clarity of the water. Storm events have a significant effect on its growth. Given its transient nature, Halodule may vary in any given area from nonexistent, to spotty, to well-established beds. As one moves further offshore, the Halodule transitions to large, continuous beds of Thalassia. Thalassia grows in deeper water, and is common to a depth of about 12 feet. Being deeper and less affected by storm energy, the line of the Thalassia beds off of Grassy Key has not substantially changed over time. As wind and waves come across the grass beds, and as tides ebb and flow, grass blades are cropped. The amount of grass varies seasonally to a degree. The cropped and dislodged seagrasses, along with other organic material entrained therein, are naturally carried by the tides and wind and stranded along the shoreline. The stranded material is known as wrack, and the line of stranded material is known as the wrack line. Grassy Key is well known for the large seagrass wracks that pile up on the shoreline. A wrack line is a normal and natural occurrence in marine environments like that of Grassy Key, and can be a good indicator of the upper edge of the water action at a particular time. The cropping and dislodging of seagrass is accentuated during major or minor storm events. During Hurricane Rita in 2005, a very large seagrass wrack was blown onto the shoreline of Grassy Key. It was subsequently blown back out to sea by the overwash from Hurricane Wilma. The decomposition of the seagrass and other organic materials creates a significant odor that is not uncommon. That odor of decomposing material is well-recognized as being associated with Grassy Key. Areas along the shoreline of Grassy Key have been used by sea turtles for nesting. However, the nature of the substrate in the area of the Property is not optimal for nesting. Generally, sea turtles require a nesting site with 15 to 20 inches of sand above the water table so as to allow them to dig a suitably deep and dry cavity for their eggs. The natural substrate along the section of Grassy Key at issue is coarser and more difficult to dig into, and does not have the depth of sand for the best chance of a successful nest. Despite the nature of the substrate, Petitioner testified as to her observation of turtle nests along her property in each year from 2006 through 2010. Since the SW Groin, the Mid-bulkhead, and the NE Groin were all in existence and functioning during that period, with work to the SW Groin having been completed by 2008, the preponderance of the evidence demonstrates that those structures have no effect on the success or failure of sea turtles to nest along the property. To the extent nesting has been disrupted since 2011, the most logical inference that can be drawn from the evidence is that such disruption is the result of the Mid-Jetty Extension, which is slated for removal under the terms of the Permit. The preponderance of the evidence demonstrates that the structures and activities authorized by the Permit will have no adverse effect on sea turtles. Hurricane Wilma In October, 2005, Grassy Key was pounded by Hurricane Wilma. The storm passed to the north, and created a substantial storm surge that moved from west to east across Grassy Key. The storm surge created a “ridge and runnel” effect on the Atlantic facing shoreline, with the channelization of the storm tide flow creating erosion and gullies on upland shore-adjacent properties. The storm surge and flooding across Grassy Key caused substantial wash-outs of sand; transported a large volume of sandy, upland sediments into the nearshore waters of the Atlantic Ocean; and created washover “fans” of material along the shoreline of Grassy Key. The effects of the Hurricane Wilma storm surge manifested just north of the Property, became substantial at the Property, and continued south down the shoreline for a considerable distance. At the Property, sand was pushed from 50 to 100 feet waterward from the existing shoreline, and a substantial runout was created running parallel and north of the SW Jetty. The sand pushed into the water buried everything in its path, including seagrasses. In short, the post-Wilma shoreline from the Property south along Grassy Key was left in a completely disrupted state. The nearshore waters fronting the properties owned by Petitioners and Applicants were affected by the deposition of sandy, upland sediments, which temporarily created areas of substantially harder-packed sediment. Over time, as the shoreline equilibrated and the sandy sediment distributed through a broader area, more typical shoreline conditions returned. The photographic evidence demonstrates that the Mid- bulkhead and the SW jetty structures were impacted by the Hurricane Wilma storm surge. In addition, the sandy area between the mid-bulkhead and the SW jetty was pushed seaward from its previous location. The scars from Hurricane Wilma remain evident through the most recent aerial photographs received in evidence. It is visually apparent that seagrass, though reappearing in patches, has not reestablished in the nearshore areas along the affected shoreline of Grassy Key -- including the areas in front of the Property and the property owned by Petitioners -- to the extent that it existed prior to the storm. Post-Wilma Activities When Hurricane Wilma hit, the Property was owned by Burgess Lea Levine. Not long after Hurricane Wilma, Ms. Levine shored up the SW Jetty, and performed work in the “beach” area between the mid-bulkhead and the SW jetty. The photographic evidence also supports a finding that the rock outline of the Mid-jetty was reestablished to its pre-Wilma configuration. The repairs to the SW Jetty resulted in a structure that is virtually indistinguishable in size and shape to the SW Jetty as it presently exists. The wrack line at the beach area after it was “worked” following the passage of Wilma, shows the area in which work was done to be generally consistent with -- though slightly seaward of -- the 2005 post-Wilma shoreline. In 2008, Ms. Levine applied for a series of exemptions and for consent of use for state-owned lands for “shoreline repair, replace earthen ramp with a concrete ramp, repair wood deck, replace mooring piles & maintenance dredge existing channel w/in Atlantic Ocean.” On September 19, 2008, the DEP issued a regulatory authorization and proprietary submerged land approval. The Rights of Affected Parties that accompanied the September 19, 2008, notice provided that “[t]his letter acknowledges that the proposed activity is exempt from ERP permitting requirements” and that “this determination shall expire after one year.” The notice of Rights of Affected Parties did not apply to the proprietary authorization. At some time after issuance of the regulatory authorization, Ms. Burgess initiated additional work to repair the SW Jetty. The photographic evidence, which is persuasive, indicates that the work on the SW Jetty, including the concrete cap, was complete by the end of 2008. When Applicants purchased the Property, the determination of exemption issued in 2008 had, by application of the notice of Rights of Affected Parties, expired. Shortly after the Applicants purchased the property, they had the existing family home demolished. Applicants intend to construct a winter vacation home for their personal use on the property. 2012 Storms In August and October 2012, Grassy Key was subject to event-driven conditions as a result of the passage of Hurricanes Isaac and Sandy. Those storms redistributed large areas of sediments that had been moved offshore by the effects of Hurricane Wilma. The Proposed Permit The February 20, 2013, Permit provides that the structures described herein do not require the issuance of an Environmental Resource Permit, subject to the criteria and conditions in Florida Administrative Code Rule 40E-4.051. The Permit provides that the boat ramp is eligible to use the general permit in Florida Administrative Code Rule 62-330.417, the repair and replacement of the dock is exempt pursuant to section 403.813(1)(b), Florida Statutes, the maintenance dredging of the Channel is exempt pursuant to section 403.813(1)(f), and that the repair and replacement of the NW Jetty, the SW Jetty, and the Mid-bulkhead are exempt because the structures are “historic in nature and pre-dates Department regulations.” In addition to the regulatory authorizations, the Permit granted proprietary authorization by Letter of Consent for the dock pursuant to Florida Administrative Code Rule 18- 21.005(1)(c)4., and for the Channel, the NW Jetty, the SW Jetty, and the Mid-bulkhead pursuant to rule 18-21.005(1)(c)7. The Permit established the mean high-water line as that existing in 1974 and depicted on the “Richmond Survey.” Proprietary authorization for the boat ramp was determined to be unnecessary due to its location above the mean high-water line. Finally, proprietary authorization for the “Sandy Area” or beach between the Mid-bulkhead and SW Jetty was granted by Letter of Consent pursuant to rule 18-21.005(1). On September 20, 2013, the DEP filed a Notice of Additional Grounds for Exemption Determination, in which it found each of the structures subject to the regulatory review to “have only minimal or insignificant individual or cumulative adverse impacts on water resources” and to thus be exempt from the need to obtain an Environmental Resource Permit pursuant to section 373.406(6), Florida Statutes. On December 12, 2013, Applicants filed a Notice of Filing Proposed Changes to the Pending Agency Action in which they agreed to certain additional conditions, and which referenced the October 1, 2013, repeal of rule 40E-4.051, and its replacement by the “Statewide ERP rules.” For purposes of this de novo proceeding, the proposed Permit at issue includes the February 20, 2013, Permit; the September 20, 2013, Notice of Additional Grounds for Exemption Determination; and the December 12, 2013, Notice of Filing Proposed Changes to the Pending Agency Action. The Proposed Structures Groins There has been some confusion relating to the names of the structures that are subject to the proposed Permit. Two of the structures are referred to as jetties, the NE Jetty and the SW Jetty, and the middle structure is referred to as the Mid- bulkhead. A jetty is a navigation structure that is constructed at a barrier inlet. Its purpose is to stabilize the inlet and prevent shoaling by “jetting” current and wave-driven sand further offshore, such that the offshore bar is moved into deep enough water to allow navigation in and out of the tidal inlet, and allowing the tidal current between the ocean and the receiving body of water to keep the inlet scoured and open. There are 48 jetties on the open coast of Florida, none of which are in the Florida Keys. A groin is a structure designed for shore protection purposes. A groin is typically aligned perpendicular to the shoreline, or “shore normal.” The structures identified in the Permit as the NE Jetty and the SW Jetty are clearly groins, and not jetties. The mid-bulkhead is a groin, generally for shore confinement, with a channel-facing bulkhead. For purposes of continuity, the structures will be identified by the names given them in the Permit. Since there is negligible wave energy along the shoreline normal conditions, the groins have little or no day- to-day effect on longshore transport. Under storm conditions, the structures affect longshore transport, as evidenced by accretional “fillets,” and function as shoreline protection and confinement structures. The rock groins provide shelter, habitat and structure for corals, sponges, lobster, and fish in the area. The preponderance of the evidence demonstrates that the groins authorized by the Permit will have no adverse effect on fish and wildlife resources. NE Jetty The NE Jetty was originally constructed in the early 1960s, likely concurrent with the dredging of the navigational channel. The quality of the aerial photographs of the period make it difficult to tell if the NE Jetty was a loosely-placed rock embankment or a more well-designed and constructed structure. However, the fillet of sand accreted to the north of the Channel demonstrates that the jetty was in existence and functioning as a shore-protection structure. By the 1970s, the NE Jetty had become overwhelmed by longshore sediment transport from the northeast. Sediment overtopped the NE Jetty and filled in the landward reaches of the Channel. At that point, ability of the NE Jetty to perform as a shore protection structure was compromised to the point that it could no longer hold the shoreline out of the basin or the landward portion of the Channel. The Mid-bulkhead became the dominant structural control over the shoreline and started to accrete the shoreline to the northeast. At some time between 1977 and 1981, the Channel was maintenance dredged pursuant to a permit issued by the Department of Environmental Regulation, DEP’s predecessor agency. The NE Jetty appeared on the plans for the maintenance dredging. Thus, the most reasonable inference that can be drawn from the evidence is that the NE Jetty was repaired and restored in conjunction with the approved maintenance dredging. By 1981, the NE Jetty had been restored as the dominant shore protection structure north of the Channel, and a fillet of accreted material had been reestablished. The aerial photographs from that period are not sufficiently distinct to determine the precise size, shape, and configuration of the NE Jetty at that time. However, there is no evidence of additional work having been performed on the NE Jetty between 1981 and 1985. By 1985, the NE Jetty existed in substantially the size, shape, and configuration as it existed at the time of Hurricane Wilma. Between 1981 and the 2005 arrival of Hurricane Wilma, the evidence is convincing that the NE Jetty was holding up the shoreline to the northeast and preventing sediment from filling in the upper reaches of the Channel. Although the evidence suggests that the NE Jetty had, by 2005, begun to show its age, the continuous presence of an accretional fillet demonstrates that it continued to serve its function as a shore-protection structure. Although the NE Jetty suffered damage from Hurricane Wilma, it continued to perform its shoreline protection function. Aerial photographs taken in 2009 and 2011 show a relatively distinct structure with a well-defined accretional fillet. Thus, the greater weight of the evidence demonstrates that, at the time of its repair in May 2011, the NE Jetty was a functional groin. The NE Jetty, as repaired in 2011, is of substantially the same size, shape, and location as the structure depicted in aerial photographs taken in 1985, 2009, and early 2011. Although the elevation of the structure was increased over its pre-repair elevation, the increase was that reasonably necessary to prevent the function of the structure from being compromised by the effects of age and weather. The work performed on the NE Jetty, consisting of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Since 2005, and at the present time, the shoreline north of the NE Jetty has reached a state of equilibrium and stability, and is not expected to change significantly from its current condition. The preponderance of the competent, substantial evidence demonstrates that the effect of the NE Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. The sand and sediment accreted to the north of the NE Jetty since 1981 is in the range of 250 square feet. SW Jetty The aerial photographs from 19647/ demonstrate that some form of structure then existed at the location of the current SW Jetty. The structure is indistinct due to what appears to be sidecast material from a small channel in front of the property to the immediate south of the Property. By 1971, the SW Jetty had become more distinct. From that time forward, the SW Jetty, and its accompanying fillet of accreted material, appears in roughly the size and shape of the structure as it appeared immediately prior to the arrival of Hurricane Wilma. The SW Jetty was heavily impacted by Hurricane Wilma. The overwash from the storm created a substantial runout alongside the SW Jetty, and the post-storm aerials suggest that the jetty boulders were undermined and shifted from their more uniform 2003 appearance. Immediately after Hurricane Wilma, the owner of the Property commenced restoration and repair activities. As part of the activities, the SW Jetty was repaired with the addition of boulders, which were often three feet and every now and then as much as four feet across. The boulders, being irregularly shaped, could not be stacked like Legos®, so the repairs were not neatly within the precise pre-Wilma footprint. However, the repaired SW Jetty was substantially in the length and location as existed prior to Hurricane Wilma, though it may have had a slightly wider cross-section. By 2007, the work on the SW Jetty was complete, and it had assumed its present appearance with the addition of a concrete cap. Its appearance -- i.e. length, width, and location -- in 2007 and 2008 was not dissimilar from its appearance in 2003. As repaired, the SW Jetty effectively constitutes the same structure that it has been since its initial construction. From a coastal engineering perspective, the work that was performed on the SW Jetty, consisting generally of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Dr. Lin testified that between 1974 and 2011, the area to the southwest of the southwest jetty was “about equalized,” though it was “accreting a little bit.” Thus, the effect of the SW Jetty on the shoreline of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners from 1974 to 2011 was minimal and insignificant. Dr. Lin testified that, since 2011, the same area had eroded. The only substantive shoreline change that logically accounts for that subsequent erosion is the Mid-bulkhead extension, which is slated for removal under the terms of the proposed Permit. Petitioner testified that she observed no adverse effects from activities on the Property until after February 2011.8/ Since work on the SW Jetty was complete by no later than 2008, Petitioner’s testimony supports a finding that the SW Jetty has had no measurable effect on the water resources in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the SW Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. Mid-bulkhead The structure of the Mid-bulkhead first appeared as part of the sidecast material from the excavation of the navigation channel in 1964. It coalesced into a defined but smaller and more rudimentary structure in the 1971-1972 time period. At that time, it was acting as the predominant shore protection structure due to the overtopping of the NE Jetty with sediment, which also filled in the landward reaches of the Channel. By 1981, after the maintenance dredging of the Channel, the Mid-bulkhead had assumed substantially the size, shape, and location that it has currently. The Mid-bulkhead has a navigation function of protecting the landward extent of the Channel from the collapse of adjacent sand and sediment, and a shore protection and compartmentalization function. Those functions have been consistent since 1981. The Mid-bulkhead appears to have been subjected to the overwash of sand and sediment from Hurricane Wilma, though it maintained its shape and form. The outline of the Mid-bulkhead appears to be more well-defined after the initial post-Wilma repairs. In any event, the configuration and size of the Mid-bulkhead is substantially the same as it had been since 1981. At some point, the interior section of the Mid- bulkhead was topped with soil that is inconsistent with that naturally occurring in the area. That fill was confined, and brought the Mid-bulkhead to a more even grade with the rock outline, but could have had no measurable effect on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the Mid-bulkhead is minimal and insignificant. Channel In 1961, the Department of the Army authorized dredging of a navigation channel at the Property. The approved channel was to be 700 feet long, 30 feet wide, and to a depth of five feet below mean low water. The Florida Trustees of the Internal Improvement Fund issued a letter of no objection. By 1964, the Channel that is the subject of this proceeding had been dredged, though not to the 700-foot length approved. Rather, the Channel was dredged to a length of approximately 290 feet. Much, if not all of the dredge spoil was sidecast, creating a rock structure alongside the Channel. Measurements taken during the course of this proceeding demonstrate that the initial dredging resulted in near vertical side slopes, which shows that the bailing of the bedrock was accomplished to the limits. The width of the Channel is from 28 feet to 32 feet wide, which is within an acceptable tolerance of the 30-foot approved width. In 1976, the then-owner of the Property sought a permit from the DEP’s predecessor, the Department of Environmental Regulation, to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, to a depth of minus 8-feet mean high water, and to construct a new rock jetty to extend 230 feet waterward from the existing terminus of the NE Jetty. Given the mean tide range of 1.7 feet at the Property, the depth of the proposed dredging would have been minus 6.3 feet mean low water, or 1.3 feet deeper than originally approved. The permit drawings depict the existing NE Jetty, the Channel boundary, the outline of the Mid-bulkhead, and the sidecast rock structure alongside the southern side of the Channel. The permit was denied. In 1977, the owner of the property reapplied for a permit to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, and to a depth of minus 4.0 feet below mean low water nearshore to minus 6 feet below mean low water at the waterward end. The proposal to construct an extension of the NE Jetty was deleted. The permit was issued, and a severance fee for the dredged material was paid based on a projected 700 cubic yards of material removed. The permit drawings and photographs depict the existing NE Jetty, the nearshore Channel boundary, and the general outline of the Mid- bulkhead. By 1981, aerial photographs demonstrate that the maintenance dredging of the Channel was complete, the NE Jetty was in place and functioning to protect the shoreline as evidenced by the accretional fillet, and the Mid-bulkhead had assumed its approximate current shape and configuration. Although the Channel has varied in depth over the years since the maintenance dredging and Hurricane Wilma, the greater weight of the evidence, including photographic evidence, indicates that the Channel was well-defined and remained navigable during that period. The Channel is an open-water exposed channel. Water in the Channel mixes due to direct tidal flow and the sheet flow of water due to shear wind stress. As water passes over the Channel, it sets up gyre, which is a mixing process. The open- water exposed Channel is subject to a high degree of mixing, even on normal waveless conditions, because of the wind transport of water and the tidal transport of water. The Channel is not a semi-enclosed basin. A semi- enclosed basin does not receive the direct forcing functions that an open-water channel receives. A semi-enclosed basin has no direct connection to open waters, but is connected to open waters by a narrower opening. Although a semi-enclosed basin exchanges water via every tidal cycle, the flushing process is one of slow mixing, in which a little bit of water is added to and withdrawn from the larger basin through the narrow opening during each tidal cycle. In such a case, a flushing analysis may be necessary to determine how much time and how many tidal cycles it may take to effect a complete exchange of the water in the semi-enclosed basin, and thus, for example, to dilute a pollutant to an acceptable level. A flushing analysis is not needed in this case because the Channel is an open-water, openly-exposed location subject to a high degree of mixing under normal day-to-day tidal processes. There is no greater basin connected by a restricting connection as with a semi-enclosed basin. Rather, the Channel has direct exposure to the tides, along with wind shear stress moving the water. The evidence in this case is substantial and persuasive, because the Channel is highly exposed to the open water and the tides, and a well-mixed and well-flushed aquatic system, that a flushing analysis is neither required nor necessary. Dock The dock made its first obvious appearance in 1981. It appears in a consistent shape and appearance through 2011. Aerial photographs taken in 2012, after the maintenance dredging of the Channel was conducted, show the dock had been removed. At the time of the hearing, the Applicants had installed new pilings and vent boards for the replacement dock, but the decking had not been installed. Work to complete the replacement of the dock was halted due to the pendency of the litigation challenging the structures. The proposed dock is less than 500 square feet. It is proposed for non-commercial, recreational activities. It is the sole dock proposed on the Property. The proposed dock will not impede the flow of water or create a navigational hazard. Boat Ramp Since the issuance of the 2008 approval, the boat ramp site was graded and stabilized in limerock material. The concrete ramp was not completed due to the pendency of the litigation challenging the structures. However, Applicants propose to pave the ramp with concrete. Based on Mr. Clark’s observations during his site visits, the boat ramp is landward of the mean high waterline depicted on the survey. The preponderance of the evidence demonstrates that the proposed boat ramp will provide access to the Channel, which provides a minimum navigational access of two feet below mean low water to the ramp. Applicants have agreed to install depth indicators at the ramp to identify the controlling depths of the navigational access. The work on the ramp involves no seagrass beds or coral communities. The ramp as proposed will require no more than 100 cubic yards of dredging. The total width of the ramp is to be 20 feet and the ramp surface will be no wider than 12 feet. Beach Area The area between the SW Jetty and the Mid-bulkhead is an accreted beach-type area that has been confined and protected by the Mid-bulkhead and the SW Jetty. The shoreline landward of the mean high water line, from the dry beach and to the upland, is somewhat steeper than adjacent unprotected shorelines, which is indicative of the grooming of the upper beach sediment and the stability of the shoreline between the Mid-bulkhead and the SW Jetty. As a result of the Hurricane Wilma storm surge, a substantial amount of sediment was swept across the Property and into the Atlantic waters. The beach area was inundated with sand and sediment from the overwash, which appears to have moved the shoreline well waterward of its previous position. Along the northern side of the SW Jetty, a substantial channelized gully was created. The configuration of the shoreline post-Wilma suggests that efforts were made by the then-owner of the Property to fill in the gully on the northern side of the SW Jetty, and to groom and restore the shoreline by redistributing sand and sediment on the Property. It is typical, and allowable under DEP emergency final orders, for affected property owners to redistribute overwashed deposits and place them back within the beach system. In that regard, the DEP encourages the redistribution of clean beach sand back onto the beach. The then-owners of the Property were not alone in taking steps to address the effects of Hurricane Wilma on their adjacent shorelines. The photographic evidence demonstrates that Petitioners engaged in similar restorative activities, which included bringing in material purchased from a contractor to fill in a gully created on their property by the overwash. Observation of representative soil samples from the beach area demonstrate that the soils are consistent with those in the upper beach areas found throughout the area. The only areas of inconsistent soils were found in the interior of the rock structure of the Mid-bulkhead, which contained a four to six-inch layer of soil with a different consistency and darker brown color, and small area of similar soil directly adjacent thereto and well above the mean high water line. The greater weight of the competent, substantial, and credible evidence demonstrates that there was no substantial amount of “fill” from off-site placed on or adjacent to the beach area. Rather, the nature, appearance, and composition of the soils suggests that the temporary increase in the size of the beach area after Hurricane Wilma was the result of grooming and redistribution of sand and sediment pushed onto the Property and into the nearshore waters by the Hurricane Wilma storm surge. In the years since Hurricane Wilma, the influence of normal tidal and weather-driven events has returned the beach area between the mid-bulkhead and the SW jetty to roughly the configuration that existed prior to the passage of Wilma, though it remains somewhat waterward of its pre-Wilma location.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law set forth herein it is RECOMMENDED that the Department of Environmental Protection enter a final order approving the February 20, 2013, proposed Permit, as conditioned by Applicants’ December 12, 2013, Proposed Changes to the Pending Agency Action. DONE AND ENTERED this 25th day of July, 2014, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of July, 2014.
The Issue The issue to be determined in this case is whether Respondent Oculina Bank is entitled to a Consolidated Environmental Resource Permit and Sovereign Submerged Lands Authorization to construct three single-family homes, an access drive, surface water management system, and three single-family docks in Indian River County.
Findings Of Fact Parties Petitioner Pelican Island Audubon Society has more than 25 members residing in Indian River County, was in existence for more than a year before Oculina Bank filed its application for the Permit, and was formed for the purpose of protecting the environment, fish, and wildlife resources. Petitioners Carolyn Stutt and Garrett Bewkes live approximately one mile north of the proposed project site, on John's Island, which is on the opposite side of the Indian River Lagoon from the proposed project site. Petitioner Carolyn Stutt uses the Lagoon for boating, nature observation, nature photography, and sketching. Petitioner Garrett Bewkes uses the Lagoon for boating and fishing. Petitioners Orin Smith and Stephanie Smith did not testify at the final hearing nor present other evidence to show they have substantial interests that could be affected by the proposed project. Respondents did not stipulate to any facts that would establish the Smiths’ substantial interests. Respondent Oculina Bank has an undivided ownership interest in the project site and is the applicant for the Permit that is the subject of this proceeding. DEP is the state agency responsible for regulating construction activities in waters of the State. DEP also has authority to process applications for authorization from the Board of Trustees of the Internal Improvement Trust Fund ("Board of Trustees") to use sovereignty submerged lands for structures and activities that will preempt their use by the general public. The Project Site The project site is 15.47 acres and located along 45th Street/Gifford Dock Road in Vero Beach. It is on the western shoreline of the Indian River Lagoon. The Lagoon in this area is part of the Indian River- Malabar to Vero Beach Aquatic Preserve. It is an Outstanding Florida Water. The Lagoon is an estuary, but it is almost non-tidal in this area. There is a seasonal rise in sea level that occurs from August to November and it is during this season that waters of the Lagoon flood into adjacent wetlands. The wetlands may be inundated at other times as a result of large storms. The wetlands along the western shore of the Lagoon play a role in regional tarpon and snook fisheries. Wetlands provide essential refuges for early-stage tarpon and snook. When the wetlands are inundated, larval tarpon and snook can move into the wetlands and seek out shallow areas to avoid predation by larger fish. The project site is dominated by salt marsh wetlands. In order to control salt marsh mosquitoes, the site was impounded by the Indian River Mosquito Control District sometime in the 1950s by excavating ditches and building earthen berms or dikes along the boundaries of the site. The mean high water line of the Lagoon in this area is 0.78 feet. The berms were constructed to an elevation of about five feet, but there are now lower elevations in some places. The wetlands on the site are isolated for much of the year because the waters of the Lagoon cannot enter the wetlands unless the waters rise above the lowest berm elevations. This connection only occurs in unusually high water conditions. The impoundment berms have decreased the frequency and duration of the project site’s inundation by waters from the Lagoon. There are almost 14 acres of wetlands impounded by the berms. The impounded wetlands are dominated by salt grass. There are also mangroves, mostly white mangroves, along the side slopes of the berms. Most of the upland areas are dominated by Brazilian pepper trees and Australian pine trees, which are non- native, invasive vegetation. Within the wetlands are three ponds. Before the project site was impounded for mosquito control, it had "high marsh" vegetation such as saltwort and glasswort, as well as black and red mangroves. The impoundment resulted in the reduction of these species. There is now reduced nutrient export from the impounded wetlands to the Lagoon. The project site still provides nesting, denning, and foraging habitat for birds and other wildlife. However, the environmental health and productivity of the wetlands on the site have been reduced by the impoundment berms. The adverse effects of impounding wetlands for mosquito control are widely understood by environmental scientists. Therefore, reconnecting impounded wetlands along the Indian River Lagoon has been a local and state governmental objective. North and south of the project site are salt marsh wetlands that have been restored. To the north is a portion of the mitigation area for a development called Grand Harbor. To the south is the CGW Mitigation Bank. Both adjacent wetland areas were restored by reconnecting them to the Lagoon and removing exotic vegetation. The restored wetlands to the north and south now contain a dominance of saltwort and glasswort. They also have more black and red mangroves. These environmental improvements, as well as an increase in species diversity, are typical for former mosquito control impoundments that have been restored. In the offshore area where the three proposed docks would be constructed, there are scattered seagrasses which are found as close as 25 feet offshore and far as 100 feet offshore. They include Manatee grass, Cuban shoal grass, and Johnson’s seagrass. The Proposed Project The proposed home sites are on separate, recorded lots ranging in size from 4.5 acres to 6.5 acres. The home sites would have 6,000 square feet of "footprint." The houses would be constructed on stilts. There would be a single access driveway to the home sites, ending in a cul-de-sac. The displacement of wetlands that would have been required for the side slopes of the access drive and cul-de-sac was reduced by proposing a vertical retaining wall on the western or interior side of the drive. Each home site has a dry retention pond to store and treat stormwater runoff. The ability of these retention ponds to protect water quality is not disputed by Petitioners. The home sites and access drive would be constructed on the frontal berm that runs parallel to the shoreline. However, these project elements would require a broader and higher base than the existing berm. The total developed area would be about three acres, 1.85 acres of which is now mangrove swamp and salt marsh and 0.87 acres is ditches. One of the onsite ponds would be eliminated by the construction. The houses would be connected to public water and sewer lines. Oculina Bank would grant a perpetual conservation easement over 11.69 acres of onsite salt marsh wetlands. It would remove Brazilian Pepper trees, a non-native plant, from the site. Petitioners' original objection to the proposed project and their decision to file a petition for hearing appears to have been caused by Oculina Bank's proposal to build docks over 500 feet in length. The dock lengths in the final revision to the project vary in length from 212 to 286 feet. The docks do not extend out more than 20 percent of the width of the waterbody. The docks do not extend into the publicly maintained navigation channel of the Lagoon. Because the docks meet the length limit specified in Florida Administrative Code Chapter 18-21, they are presumed not to create a navigation hazard. To reduce shading of sea grasses, the decking material for the docks would be grated to allow sunlight to pass through the decking. There are no seagrasses at the waterward end of the docks where the terminal platforms would be located and where boats would usually be moored. The dock pilings will be wrapped with an impervious membrane to prevent the treatment chemicals from leaching into the water. In Oculina I, the Administrative Law Judge determined that the condition for vessels moored at the proposed docks should be stated as a maximum permissible draft. The Permit imposes a maximum draft for boats using the docks. Fish Survey Oculina Bank conducted a fish sampling survey in 2014 to obtain additional information about the presence of tarpon, snook, rivulus, and other fish on the project site. Twenty-three sampling stations were established and sampled from January 16, 2014 to February 16, 2014. The survey was conducted during a period of seasonal high water in order to catalog the highest number of fish that might migrate in and out of the site during high water. Oculina Bank collected five species of fish that are typically found in impounded areas. No tarpon or snook were found. Oculina Bank did not find Florida Gar or Least Killifish during the fish survey, but Dr. Taylor observed these two species on his site inspection in 2015. He also saw three to five juvenile tarpon. No testimony about snook was presented at the final hearing nor was this fish mentioned in Petitioners’ Proposed Recommended Order. Mangrove Rivulus Rivulus marmoratus, or mangrove rivulus, is designated a species of special concern by the FWC. See Fla. Admin. Code R. 68A-27.005(2)(b). Species of special concern are those species for which there are concerns regarding status and threats, but for which insufficient information is available to list the species as endangered or threatened. Some research indicates rivulus are more common than originally believed. Certain populations of rivulus in Florida are healthy and thriving. A team of scientists who participated in a biological status review of the rivulus for the FWC recommended that the rivulus be delisted. The team included Dr. Taylor and Dr. Wilcox. In Oculina I, Dr. Gilmore did not find any rivulus on the project site, but he expressed the opinion that the site had rivulus habitat and they were probably on the site. In his more recent visits to the project site in conjunction with the current proceeding, Dr. Gilmore did not observe any rivulus. Oculina Bank did not find any rivulus during its fish survey. Dr. Taylor sampled for rivulus on the site on five different days in 2015 and found five rivulus in a ditch outside (waterward) of the impoundment berm. Dr. Taylor sampled “extensively” for rivulus in the interior of the project site, but found none there. Still, he believes there are probably some in the interior. The area where the rivulus were found outside the impoundment berm would not be changed by the proposed project. However, Oculina Bank’s proposal to scrape down the impoundment berm would eliminate many crab burrows, which are habitat for the rivulus. Dr. Taylor and Dr. Wilcox agreed that rivulus are more likely to be found in areas that are tidally connected. The preponderance of the evidence does not support Petitioners’ claim that the proposed project would, on balance, adversely affect the mangrove rivulus. However, the recommended permit modifications should benefit the species. Tarpon In Oculina I, Dr. Gilmore testified that the project site was “one of the critical habitats maintaining regional tarpon fisheries.” However, he only observed one “post larval” tarpon in 2012 and none in 2014. Dr. Gilmore stated that a small mesh seine is the best method to sample for these nursery phase tarpon, but he never used such a seine to sample for them on the project site, nor did anyone else. Extensive evidence regarding on-site investigations and literature related to tarpon was presented at the final hearing. Sometimes the testimony failed to distinguish between early stage (larval) tarpon and later stage (juvenile) tarpon, whose habitat needs are not the same. The nursery and refuge functions of the wetlands on the project site relate primarily to larval tarpon, not juvenile tarpon. The shallow ponds on the project site are an important habitat type that can be used by larval tarpon when related hydrologic conditions are compatible. The preponderance of the evidence does not support the characterization of the wetlands on the project site as “critical habitat” for tarpon in the region. The current hydrologic conditions diminish the value of the nursery and refuge functions provided by the wetlands. Improving the connection between the wetlands and the Lagoon can enhance the tarpon nursery function if the improved connection is made without giving predators of larval tarpon access to the interior ponds. Dr. Gilmore stated, “you don’t have to take down the entire dike, you can create low spots.” By low spots, he means areas like the one that currently exists in the southern impoundment berm that is at about elevation 2.0 feet. The preponderance of the evidence shows the proposed project would not adversely affect the nursery function of the wetlands for tarpon if the recommended modifications are made to the Permit to improve the connection to the Lagoon while keeping the interior ponds isolated from the Lagoon for most of the year. Mitigation DEP conducted a Uniform Mitigation Assessment Methodology (“UMAM”) analysis for the proposed project that assumed direct impacts to 2.72 acres of mangrove swamp. It did not account for secondary impacts that could be caused by the proposed project. DEP’s UMAM analysis determined there would be a functional loss of 1.269 units. It further determined that these losses would be offset by the creation of 0.88 acres of salt marsh and the enhancement of 10.81 acres of mangrove swamp, resulting in a net functional gain of 2.342 units. DEP concluded that, if functional losses caused by secondary impacts were included, there would be a functional loss of 2.350 units, which still results in a net gain of 3.056 units. Because DEP determined there would be a net gain in functional value, it did not require Oculina Bank to provide additional on-site mitigation or to purchase mitigation credits from an off-site mitigation bank. The UMAM analysis performed by DEP did not adequately account for the lost tarpon nursery function and the proposed mitigation could further diminish the nursery function. The purchase of mitigation bank credits would not offset the lost nursery function because the mitigation bank was not shown to provide a nursery function.
Recommendation Based upon the foregoing Findings of Fact and Conclusion of Law, it is RECOMMENDED that the Department of Environmental Protection issue Permit No. 31-0294393-003-EI, with the following modifications: The impoundment berm will not be scraped down to mean sea level, but, instead, two new low spots will be created in the impoundment berm at an elevation of approximately 2.0 feet. A new isolated pond will be created to replace the one that will be eliminated by the construction, similar in size to the one that will be eliminated. Internal ditches and other channels will be filled as needed to eliminate predator access to the ponds. If these modifications are not made, it is recommended that the Permit be denied. DONE AND ENTERED this 1st day of June, 2016, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of June, 2016. COPIES FURNISHED: Marcy I. LaHart, Esquire Marcy I. LaHart, P.A. 4804 Southwest 45th Street Gainesville, Florida 32608-4922 (eServed) Glenn Wallace Rininger, Esquire Department of Environmental Protection Douglas Building, Mail Stop 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 (eServed) Nicholas M. Gieseler, Esquire Steven Gieseler, Esquire Gieseler and Gieseler, P.A. 789 South Federal Highway, Suite 301 Stuart, Florida 34994 (eServed) Jonathan P. Steverson, Secretary Department of Environmental Protection Douglas Building, Mail Stop 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 (eServed) Craig Varn, General Counsel Department of Environmental Protection Douglas Building, Mail Stop 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 (eServed) Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Stop 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 (eServed)
The Issue The issue is whether the Department should issue Environmental Resource Permit and Sovereign Submerged Lands Authorization No. 43-0197751-003 to Reily.
Findings Of Fact Parties The Department is the agency that approved the permit at issue in this proceeding. The Department is responsible for protecting the water resources of the state in conjunction with the water management districts, and it is also responsible for authorizing the use of sovereignty submerged lands pursuant to a delegation of authority from the Board of Trustees of the Internal Improvement Trust Fund. The activities authorized by the permit are as follows: The purpose of the project is to install a 395 linear foot upland retaining wall, with one 10 linear foot return, located at least 5-feet landward of the Mean High Water Line, and an 85 linear foot seawall, with one 10 linear foot return, located at the Mean High Water Line. Riprap shall be installed at a 2:1 (Horizontal:Vertical) slope along the 85 linear foot seawall, and will extend out a maximum of 4-feet waterward of the toe of the new seawall. [3] Reily is the applicant for the permit. Reily owns approximately 17.74 acres of property along Indian River Drive in Jensen Beach, just north of the Jensen Beach Causeway. The Reily property extends from the Indian River on the east to Skyline Drive on the west. Indian River Drive runs north and south through the east side of the property. The Reily property to the east of Indian River Drive is undeveloped except for an existing restaurant, Dena’s, which is on the southern end of the property. There is an existing “RV park” on the Reily property to the west of Indian River Drive. The project will be located to the east of Indian River Drive. That portion of the Reily property is approximately one acre in size, and is only 149 feet wide at its widest point. The property is 24 feet wide at its narrowest point, and more than half of the property is less than 68 feet wide. Petitioners live in single-family homes to the west of the Reily property. Each of their homes is within 300 feet of the Reily property to the west of Indian River Drive, but more than a quarter of a mile from the property on which the permitted activities will be located. Petitioner Anthony Parkinson sometimes drives by the property where the permitted activities will be located when he takes his daughter to school; he has had breakfast at Dena’s several times; he looks at the property from the causeway; and, on at least one occasion, he and his daughter looked at vegetation in the water adjacent to the Reily property for a school project. Mr. Parkinson testified that the project will negatively affect his quality of life because he “came to Jensen Beach because of the natural shoreline and the protection that it afforded to residents in terms of natural beauty” and that, in his view, the project “just adds to the incredible bulk that we have here in the property in terms of building in our natural shoreline.” Petitioner Michael Cilurso drives by the property where the permitted activities will be located on a fairly regular basis. He goes onto the property “occasionally” to “look around.” He has waded in the water adjacent to the property and has seen blue crabs, small fish, and underwater vegetation. Mr. Cilurso testified that the project will affect him in two ways: first, he will no longer be able to “go from the road and just walk down and wade around in [the river] and enjoy the natural resources;” and second, the proposed development of the overall Reily property will affect his “quality of life” because “the density [is] going to be more than what we thought would be a fit for our community.” Petitioner Thomas Fullman can see the Indian River from his house across the Reily property. He and his family have “spent time down at the causeway,” and they have “enjoyed the river immensely with all of its amenities” over the years. He is concerned that the project will affect his “quality of life” and “have effects on the environment and aquatic preserve [that he and his family] have learned to appreciate.” The Permit (1) Generally The permit authorizes the construction of an 85-foot- long seawall and a 395-foot-long retaining wall on the Reily property and the placement of riprap on the sovereignty submerged lands adjacent to the seawall. The seawall will be located on the mean high water line (MHWL). The riprap will be placed adjacent to the seawall, below the MHWL, and will consist of unconsolidated boulders, rocks, or clean concrete rubble with a diameter of 12 to 36 inches. The retaining wall will be located five feet landward of the MHWL, except in areas where there are mangroves landward of the MHWL. In those areas, the retaining wall will be located "landward of the mangroves". The permit does not require the retaining wall to be any particular distance landward of the mangroves or even outside of the mangrove canopy. The drawings attached to the permit show the retaining wall located under the mangrove canopy. The permit does not authorize any mangrove trimming. The areas landward of the seawall and retaining wall will be backfilled to the level of Indian River Drive. There will be swales and/or dry retention areas in the backfilled areas to capture storm water and/or direct it away from the river. The retaining wall will connect to an existing seawall on the Conchy Joe property immediately to the north of the Reily property. The seawall will connect to the approved, but not yet built seawall on the Dutcher property immediately to the south of the Reily property. The permit requires the use of erosion control devices and turbidity curtains during the construction of the walls in order to prevent violations of state water quality standards. (2) Permit Application and Review by the Department On or about June 23, 2005, Reily sought a determination from the Department that the seawall and retaining wall were not subject to the Department’s permitting jurisdiction. The project, as initially proposed, did not include the placement of riprap along the seawall. The Department informed Respondent in a letter dated October 11, 2005, that “the proposed seawall is within the Department’s jurisdiction.” The letter further stated that the Department was going to “begin processing [the] application as a standard general permit,” and it requested additional information from Reily regarding the project. The Department’s request for additional information (RAI) asked Reily to “justify the need for a seawall” and to “provide a detailed explanation” as to why the “use of vegetation and/or riprap is not feasible at the site” for shoreline stabilization. Reily responded as follows: Recent hurricanes have destroyed any vegetation that existed within the area of the proposed seawall. Shoreline has been lost and the DOT has had to backfill nearby upland areas and repair the roads due to significant erosion. The application is proposing to place riprap along the foot of the proposed seawall. There is no reason to believe that there will not be more storms in the near future and it is the applicants’ [sic] position that the seawall for this area is the only way to assure permanent shoreline stabilization and would be in the public’s best interest. The RAI also asked Reily to provide “a detailed statement describing the existing and proposed upland uses and activities.” (Emphasis in original). In response, Reily stated: “The existing upland use is an R.V. resort complex. The proposed use will remain the same.” The RAI also asked Reily to “provide details on the current condition of the shoreline at the site, including the location of mangroves and other wetland vegetation" and to "indicate if any impacts to these resources are proposed.” (Emphasis supplied). In response, Reily stated: “Please see plan view drawing sheet 2 of 4 that clearly shows that the proposed retaining wall will be located landward of the existing mangroves.” The sheet referenced in the response to the RAI does not show the location of wetland vegetation as requested by the Department. The referenced sheet is also inconsistent with other drawings submitted by Reily (e.g., sheet 3 of 4), which show that the proposed retaining wall will be located under the mangrove canopy, not landward of the existing mangroves. Reily’s response to the RAI was submitted on or about February 23, 2006. The Department gave notice of its intent to issue the permit on April 19, 2006. The permit included a number of general and specific conditions imposed by the Department. The permit states a petition challenging the issuance of the permit must be filed “within 14 days of publication of the notice or within 14 days of receipt of the written notice, whichever occurs first.” Notice of the Department’s intent to issue the permit was not published, and the record does not establish when Petitioners received written notice of the permit and the “notice of rights” contained therein. Mr. Cilurso acknowledged that he “found out about the DEP permit to Mr. Reily [approximately] six or eight months before [his] deposition in October [2006]” and then discussed it with the other Petitioners, but that testimony does not establish when the Petitioners received actual written notice of the permit. Petitioners’ challenge to the permit was filed with the Department on or about July 3, 2006. (3) The Related Pitchford’s Landing Project Contrary to the representation made by Reily to the Department during the permitting process, the evidence presented at the final hearing establishes that Reily is proposing to change the use of the upland property from an RV park to a residential development known as Pitchford’s Landing. A master site plan for the Pitchford’s Landing development was submitted to Martin County for approval in April 2006. The site plan (Pet. Ex. 10) shows extensive residential development to the west of Indian River Drive, including single- family lots and multi-story condominium buildings; construction of a sidewalk, bike path, pool, cabana, public pier, and riverwalk to the east of Indian River Drive; the refurbishment of Dena’s restaurant; and the "proposed seawall." Petitioners were aware that the plans for Pitchford’s Landing included a seawall by April 2006, but the evidence was not persuasive that they had received written notice of the Department’s intent to issue the permit at that time. The Pitchford’s Landing development will require changes to the land use designation of the Reily property in the Martin County Comprehensive Plan as well as zoning changes. Those local approvals had not been obtained as of the date of the final hearing. The plans for the Pitchford’s Landing development are being revised based, at least in part, on opposition from Petitioners and others involved in an “association” known as The Jensen Beach Group. Petitioners Cilurso and Fuller are active members of the group, and Petitioner Parkinson has also participated in the group’s activities. Bruce Jerner, one of Reily’s consultants, testified to his understanding that the pool, cabana, and riverwalk shown on the master site plan are being removed from the Pitchford’s Landing development. However, there is no evidence to suggest that the Reily property to the east of Indian River Drive and/or the other improvements on that property (including the hardened shoreline authorized by the permit) are being removed from the Pichford’s Landing develoment. The more persuasive evidence establishes that the proposed seawall, retaining wall, and riprap are part of the larger Pitchford’s Landing development. The walls were referred to on the master site plan for the development; they were depicted and discussed in an advertising brochure as an amenity of the development; and signs advertising Pitchford’s Landing are located on the Reily property to the east of Indian River Drive on which the seawall and retaining wall will be located. There is no evidence that the Pitchford’s Landing development has received a permit from SFWMD under Part IV of Chapter 373, Florida Statutes. The master site plan for Pitchford’s Landing shows several “dry retention areas” to the west of Indian River Drive, and as noted above, there will be swales and/or dry retention areas in the backfilled areas behind the retaining wall and seawall to capture storm water and/or direct it away from the river. It cannot be inferred from that evidence alone, however, that the Pitchford’s Landing development will require permits from SFWMD under Part IV of Chapter 373, Florida Statutes. Merits of the Project The Indian River in the vicinity of the Reily property is a Class III waterbody, an outstanding Florida water (OFW), and part of the Jensen Beach to Jupiter Inlet Aquatic Preserve. The Jensen Beach to Jupiter Inlet Aquatic Preserve is one of three aquatic preserves that encompass the Indian River Lagoon system that extends from Vero Beach to Jupiter Inlet. The Jensen Beach to Jupiter Inlet Aquatic Preserve is 37 miles long and encompasses approximately 22,000 acres of surface water area. The entire Indian River Lagoon system is 49 miles long, with approximately 33,000 acres of surface water area. The Management Plan that was adopted for the Jensen Beach to Jupiter Inlet Aquatic Preserve in January 1985 described the Indian River Lagoon system, and explained its ecological importance as follows: The Indian River Lagoon area is a long, shallow lagoonal estuary important in this region for its value to recreational and commercial fishing, boating and prime residential development. The preserve is in a rapidly growing urban area affected by agriculture and residential drainage. The majority of the shoreline is mangrove fringed, with scattered development in single family residences and a few condominiums. The lagoon is bounded on the west by the Florida mainland and on the east by barrier islands. The Intracoastal Waterway runs the length of the lagoon, which is designated as a wilderness preserve. The estuary is an important home and nursery area for an extensive array of fish and wildlife. The major problems in the continued health of this area include the construction of major drainage networks that have increased the fresh water flow into the estuary, and the loss of wetland areas and water quality degradation associated with agricultural drainage and urban runoff. Additionally, the Intracoastal Waterway and the maintained inlets have changed the historical flushing and circulation within the lagoon system. The Management Plan explained that the “major objectives of the aquatic preserve management program are to manage the preserve to ensure the maintenance of an essentially natural condition, and to restore and enhance those conditions which are not in a natural condition.” The Management Plan recognizes “the rightful traditional uses of those near-shore sovereignty lands lying adjacent to upland properties,” and with respect to bulkheads, the Management Plan states: Bulkheads should be placed, when allowed, in such a way as to be the least destructive and disruptive to the vegetation and other resource factors in each area. Approved uses which do destruct or destroy resources on state-owned lands will require mitigation. The mitigation will include restoration by the applicant or other remedy which will compensate for the loss of the affected resource to the aquatic preserve. Most of the shoreline along the Reily property is a gently sloping sandy beach that has been previously disturbed, and is largely barren of vegetation. There are, however, areas along the shoreline where dense vegetation exists, including wetland vegetation and three stands of mature red and black mangroves. Birds, fish, and wildlife have been observed on and around the Reily property. However, there is no credible evidence that any listed species use the uplands or near-shore waters where the project will be located. The sovereignty submerged lands immediately adjacent to the Reily property on which the riprap will be placed are barren, sandy, and silty. There are seagrasses in the vicinity of the Reily property, but they are 30 to 50 feet from the shoreline. The seagrasses include Johnson’s seagrass, which is a listed species. There are no significant historical or archeological resources in the vicinity of the Reily property, according to the Department of State, Division of Historical Resources. In 2004, Hurricanes Frances and Jean made landfall in Martin County in the vicinity of the Reily property. The hurricanes washed out portions of Indian River Drive, including a portion of the road approximately one-half mile north of the Reily property. After the hurricanes, Martin County considered placing bulkhead along the entire length of Indian River Drive to provide shoreline stabilization and to prevent further damage to the road in major storm events. The county did not pursue the plan because it determined that it was not financially feasible. The portion of Indian River Drive along the Reily property did not wash out during the 2004 hurricanes. Nevertheless, on November 4, 2004, because of concerns for the stability of the shoreline along the Reily property, the Department issued an Emergency Field Authorization to the prior owner of the property allowing the installation of 160 linear feet of riprap along the shoreline. The riprip authorized by the Emergency Field Authorization was to be placed considerably further landward than the structures authorized by the permit at issue in this case. The record does not reflect why the riprap was not installed. The evidence was not persuasive that the Reily property has experienced significant erosion or that the project is necessary to protect Indian River Drive or the upland property from erosion. The project will, however, have those beneficial effects. No formal wetland delineation was done in the areas landward of the MHWL or the areas that will be backfilled behind the proposed seawall and retaining wall and, as noted above, Reily did not identify the location of wetland vegetation and any impacts to such vegetation in response to the RAI. Mr. Jerner testified that, in his opinion, there are no wetlands landward of the MHWL in the area of the seawall, and that any wetlands in the area of the retaining wall are waterward of that wall, which will be at least five feet landward of the MHWL. The Department’s witness, Jennifer Smith, testified that it was her understanding that the wetlands did not extend into the areas behind the seawall or retaining walls, but she acknowledged that she did not ground-truth the wetland boundaries and that wetland vegetation appeared to extend into areas that will be backfilled. Petitioners’ expert, James Egan, testified that the wetlands likely extended into areas that will be backfilled based upon the topography of the shoreline and the wetland vegetation that he observed, but he made no effort to delineate the extent of the wetlands in those areas and he testified that he would defer to the Department's wetland delineation if one had been done. The Department’s wetland delineation rules in Florida Administrative Code Rule Chapter 62-340 contain a detailed quantitative methodology to be used in making formal wetland boundary delineations. That methodology is to be used only where the wetland boundaries cannot be delineated through a visual on-site inspection (with particular attention to the vegetative communities and soil conditions) or aerial photointerpretation in combination with ground truthing. Thus, the Department’s failure to do a formal wetland delineation (with soil sampling, etc.) in the project area was not per se inappropriate, as Mr. Egan seemed to suggest. That said, the more persuasive evidence fails to establish that Reily made an appropriate effort to delineate the landward extent of the wetlands in the project area. No delineation of the wetland areas was provided in response to the RAI, and Ms. Smith’s testimony raises more questions than it answers regarding the correctness of Mr. Jerner’s conclusory opinion that the wetland boundary is waterward of the retaining wall. Without an appropriate delineation of the wetland boundaries, it cannot be determined with certainty whether or not there are wetlands in the areas that will be backfilled. The evidence establishes there may be wetlands in those areas; and if there are, the impacts to those wetlands have not been assessed or mitigated. Riprap is a better method of shoreline stabilization than a vertical seawall without riprap. The riprap helps to prevent shoaling by absorbing wave energy, and it also provides habitat for benthic organisms, crustaceans, and small fish. Native vegetation provides these same benefits, and all of the experts agreed that it is the best method of shoreline stabilization from an environmental standpoint. The use of native vegetation to provide shoreline stabilization along the Reily property is not a reasonable alternative under the circumstances. First, the shoreline has not experienced any significant vegetative recruitment since the 2004 hurricanes. Second, the property is not wide enough to accommodate the amount of vegetation that would be needed to stabilize the shoreline. Third, the properties immediately to the north and south of the Reily property are already (or soon will be) protected by seawalls and/or riprap, rather than native vegetation. The project will not adversely affect the property of others. The evidence was not persuasive that the project will cause erosion or other impacts to the adjacent properties, particularly since the adjacent properties have, or soon will have hardened shorelines. The project will not adversely affect the conservation of fish and wildlife and, to the contrary, the riprap will provide a benefit to fish and wildlife by providing shelter and habitat for benthic organisms, crustaceans, and small fish. The project will not adversely affect endangered or threatened species or their habitat. The only listed species shown to exist in the vicinity of the project, Johnson’s seagrass, is 30 to 50 feet from the shoreline, which is too far away from the project to be affected even if, as suggested by Petitioners' experts, the impact of wave energy on the walls will cause increased turbidity and sedimentation. The project will not adversely impact the fishing or recreational values or marine productivity in the area. The waters in the vicinity of the project are not shellfish harvesting areas, and the riprap will provide beneficial habitat for small marine life. The project will not adversely affect navigation. The riprap will extend only four feet into the Indian River in an area of shallow water far from the channel of the river. The project will not cause harmful erosion or shoaling or adversely affect water quality in the area. The evidence was not persuasive that wave energy will routinely impact the retaining wall to an extent that will cause increased turbidity or sedimentation in the surrounding waters, and all of the experts agreed that the riprap will help to prevent this from occurring along the seawall. Moreover, the swales and/or dry retention areas behind the seawall and retaining wall will help to filter storm water runoff from Indian River Drive and the adjacent upland properties, which may enhance the water quality in the vicinity of the project. The project will not result in any adverse secondary or cumulative impacts to the water resources. The adjacent properties already have hardened shorelines. The permit conditions include adequate safeguards (e.g., turbidity curtains and erosion control devices) to protect the water resources in the aquatic preserve during construction of the project. Any impact (either positive or negative) of the project on the aquatic preserve and the Indian River Lagoon system as a whole will be de minimus in light of size of the system in comparison to the small size of the project and its location between two hardened shorelines near a man-made causeway.
Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department issue a final order dismissing Petitioners’ challenge to the permit/authorization for a lack of standing, but if the Department determines that Petitioners have standing, it should issue a final order denying permit/authorization No. 43-017751-003 absent an additional condition requiring an appropriate wetland delineation to show that the upland aspects of the project will occur outside of the mangrove canopy and any other wetland areas landward of the MHWL. DONE AND ENTERED this 12th day of February, 2007, in Tallahassee, Leon County, Florida. S T. KENT WETHERELL, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 2007.
The Issue The issues presented in this matter concern the request by the Petitioner to be granted a management and storage of surface waters permit by Respondent. Respondent proposes to deny the permit based upon the perception that the activities contemplated by Petitioner: (1) are not consistent with the public interest as envisioned by Section 373.016, Florida Statutes, and 40C- 4.301(1)(b), Florida Administrative Code, (2) are not a reasonable and beneficial activity, per Section 40C-4.301(1)(a), Florida Administrative Code, alter the peak discharge rate of runoff from the proposed activity or the downstream peak stage or duration for the 1 in 10 year design storm, per Section 40C-4.301(3)(a), Florida Administrative Code, (4) cause an increase in velocity or flood stage on lands other than those owned, leased, or otherwise controlled by the applicant for the design storm, per Section 40C-4.301(3)(b), Florida Administrative Code, (5) cause an increase in flow or stage such that it would adversely affect lands other than those owned, leased, or otherwise controlled by the applicant, per Section 40C-4.301(3)(c), Florida Administrative Code. 1/
Findings Of Fact A predecessor applicant had requested permission to construct and operate the water management system which is the subject of this controversy. The approximate acreage involved was 197 acres in Lake County, Florida. This acreage and requested activity was subject to the regulatory requirements of St. Johns River Water Management District. Clay Island Farms, Inc., hereinafter referred to as CIF, was substituted for the initial applicant and this matter has been litigated before the Division of Administrative Hearings on the continuing application of the Petitioner. The permit application number is 4- 8089. This application was considered with application number 4-8088, pertaining to property owned by A. Duda and Sons, Inc. Subsequently, the latter application shall be referred to as the Duda request for permit. Certain additional information was sought by Respondent from the applicants, CIF and Duda, in the permit review, by correspondence dated October 2, 1981. A copy of that correspondence may be found as Petitioner's Exhibit No. 16 admitted into evidence. In particular, CIF was requested to prepare pre and post-development runoff rates in the 1 in 10, 1 in 25,and 1 in 100-year storms, to include stage-storage and stage-discharge rates for any and all retention facilities within the project design. Petitioner's Composite Exhibit No. 1 admitted into evidence contains a copy of the engineering report by CIF which are CIF's responses to the request for information. The date of the engineering report is July 12, 1982. The CIF application, as originally envisioned, called for the construction of exterior and interior ditches to be placed around a dike of 71 feet MSL elevation. The dike would enclose a proposed farm operation of approximately 197 acres, should the permit be granted. Within that 197 acre plot, would be found numerous drainage ditches to include major ditches and minor arterial ditches. The purpose of those ditches found in the 197 acres would be to serve as a conveyance for rainfall runoff. The system of conveyance would be connected to an existing conveyance system already in place and related to farm operations of A. Duda and Sons. The runoff would be eventually placed in a retention pond and at times discharged from that retention pond or basin into Lake Apopka by means of gravity flow. The particulars of the development of the 197 acre plot and its service dike, canals, and ditches are more completely described in Petitioner's Exhibit No. 1, which is the engineering report for the surface water management permit application. The CIF application was reviewed by the staff of the Respondent. Recommendation was made to deny the permit. Details of that denial may be found in Respondent's Exhibit No. 1. In the face of the denial, CIF requested an administrative hearing. This request was made on August 27, 1982, by petition for formal Subsection 120.57(1), Florida Statutes, hearing to determine Petitioner's entitlement to the requested permit. St. Johns River Water Management District, in the person of its governing board, determined to refer this matter to the Division of Administrative Hearings to conduct the formal proceeding and the request for the assignment of a hearing officer was received by the Division on September 13, 1982, leading to the final hearing in this cause. During the course of the final hearing, the CIF permit application was modified in a fashion which reduced the amount of acreage sought for cultivation. Now, approximately 122 acres would be farmed per the amended proposal. A general depiction of the design of the project in its amended form may be found in the engineer's sheet, which is Petitioner's Exhibit No. 20 admitted into evidence. When contrasted with the engineering drawings set out in Petitioner's Composite Exhibit No. 1, the new design is essentially the same as contemplated in the original permit application, on a lesser scale. Other than dimensions, the basic concepts of the CIF operation would remain the same under the amended proposal. At present, Petitioner proposes to remove the vegetation which covers the subject 122 acre plot and to conduct a muck farming operation. That vegetation is mostly mixed hardwood with the primary species being red maple. The soil in this area is constituted of monteverde muck, which is conducive to the production of corn and carrots, the crops which Petitioner would plant, to prepare the land for the operation, the system of ditches dikes and canals described would be installed following the cleaning, draining, and leveling of the 122 acres. Petitioner's Exhibit No. 10 admitted into evidence depicts land which has been cultivated and the subject 122 acres in its undisturbed state. Petitioner's Exhibit No. 4 admitted into evidence shows the overall CIF area is outlined in red, except for its southerly extent, which carries a red and yellow line on the exhibit. This exhibit depicts Wolfshead Lake which is a small interior lake in the southeastern corner of the overall CIF property. The yellow line in the middle of the CIF property represents, the location of a former north-south canal. The westernmost north-south reach, which is shown with a red line, depicts a canal which runs north from Wolfshead Lake into the existing Duda system of canals and ditches. The Duda operation has attempted to plug that north-south canal on the western fringe to stop the flow from the area of Wolfshead Lake, but has been unsuccessful and the water still enters the Duda farm ditches and canals. In the 1940's and early 1950's, the CIF property had been partially developed for a cattle operation and truck farming. Those canals, as described before, were installed, together with the diagonal yellow line on Petitioner's Exhibit 4, which represents a canal that was built with an axis running northeast and southwest. In addition, there was a centrally placed east-west canal and a slough running from Wolfshead Lake in a southeasterly direction. The slough is still there, although water that might be diverted from the Wolfshead Lake area into the slough is flowing north in the westerly north-south canal at present. If the project were allowed, most of the water flowing in and around the Wolfshead Lake would be introduced into the slough and from there exit to Lake Apopka. The center north-south canal and the interior east-west canal, together with the diagonal canal, are not in operation at present. The center north-south-canal would become the approximate eastern boundary of the 122 acres with the western north-south canal representing the approximate western boundary of the 122 acre plot. The northern boundary of the CIF property is constituted of an east-west canal which is part of the present Duda system. This is the only one of the canals associated with the former farming operation on the CIF property which is part of any maintained system of conveyances presently in existence. Approximately 1,000 acres are being farmed by Duda and Sons in property north of the proposed project. The Duda permit application, 4-8088 as granted, is described in Petitioner's Exhibit No. 13 which is a copy of the permit. This acreage is generally found to the northwest of the CIF plot, and would allow an additional 300 acres to be farmed in that muck area, on land which has been cleared for the most part and/or which has an elevation predominantly above 68.5 feet MSL. Eighty acres of the proposed Duda permit application was denied based upon the fact that it had not been cleared prior to the Duda permit application and in consideration of the amount of the 80 acre segment which lies below 68.5 feet MSL. The elevation 68.5 feet MSL represents the flood plain for the 1 in 10 year rainfall event for Lake Apopka. The area of the Duda permit is depicted on Petitioner's Exhibit No. 4 and outlined on that exhibit with lines of green and yellow at the southern end, green and yellow and red and yellow on its western flanks, red at the north end and by red on the east side, together with a Duda drainage ditch, which runs north from the terminus of the north-south drainage ditch coming from Wolfshead Lake and the east-west drainage ditch at the northern extent of the CIF property. Exhibit No. 4 was made prior to clearing operations depicted in Petitioner's Exhibit No. 10 and that letter exhibit is a more correct indication of the appearance of the new Duda permit property today. A green diagonal line running northwest and southeast intersecting with a line running east-west and a line running north-south depicts the approximate part of the 80 acres, which lies below 68.5 feet MSL, as shown in Petitioner's Exhibit No. 4. Farm operations, in keeping with the authority of Permit No. 4-8088, have not commenced. If the CIF permit application is successful, the original 1,000 acres, approximately 300 acre area of the Duda permit and the 122 acres of CIF, would be tied in by a system of conveyance ditches or canals allowing the interchange and transport of water through and around the three farm areas. The existing retention pond would be expanded to accommodate the additional farm acreage. The Petitioner is willing to increase the present retention pond to a design capacity which would equal one acre of basin for each ten acres of farm land, at the place in time when all three elements of the muck farm operation were under way. This again pertains to the existing 1,000 acres, the approximately 300 acre recent Duda permit, and the 122 acres related to the CIF application. With the addition of the CIF acreage, when water in the ditches reached 67.1 feet MSL, this would cause the engagement of a 40,000 GPM pump allowing the ditch water influent into the retention pond. The pump automatically would shut off at any time the water level in the access ditches to the pond dropped below 61 feet MSL. The primary purpose of the retention pond is to make water available for irrigation of crops, in its present state, and as contemplated with the addition of the CIF project. The pond does and would detain farm water for a period of about a day allowing the settling out of certain nutrients which are in particulate form. The existing pond and in its expanded form does not and would not filter nutrients which have been dissolved and have become a part of the water column. At times of high incidence of rainfall, when the crops are inundated with water for a 48-hour period of time, the retention pond is now designed and as contemplated by the addition of the CIF farm land, would allow for the discharge of effluent into Lake Apopka through two discharge culverts. The discharge is by means of gravity through an adjustable riser system. The retention pond as presently designed and as contemplated in its expansion has established the height at which water would be released from the retention pond into Lake Apopka through the riser at 68 feet MSL. The occasion of high incidence of rainfall occurs during the normal rainy season in a given year. Discharge could also be expected in the 1 in 10 year, 24hour storm event. During that storm event or design, Lake Apopka would rise to a level of 68.54 feet MSL, a level which would correspond to the 10year flood plain. Whether in the pre or post-development phase of the 122 acres, waters from that acreage would be discharged during the course of the storm through culverts leading from the retention pond into Lake Apopka. This process would continue until the gravity flow stopped at the moment where the water level in the pond and the water level in Lake Apopka adjacent to the discharge culverts achieved equilibrium of elevation. At that point in time, the gravity flow or discharge from the retention basin would cease, there no longer being a positive gradient from the detention pond to Lake Apopka. There will be some amount of discharge in the 24-hour storm event through the culverts at the retention pond either in the pre or post-development phases of the project, because, at present, the western most north-south ditch, which is found at the western boundary of the CIF property, allows water to flow north into the present Duda ditch system, water which has fallen on the 122 acres in question. From the ditch system, that water finds its way into the retention pond and thus into the lake. The contemplated system to be installed with the 122 acres at build-out would also allow water from the 122 acres to go through a system of conveyances and to the retention pond and from there into Lake Apopka. Although considerable testimony was presented by both parties on the subject of comparing pre-development and post-development peak discharge rates of runoff from the proposed activity, in the 1 in 10 year, 24-hour storm design or event, neither party has satisfactorily proven the dimensions of the pre-development and post-development peak discharge rates of runoff from the proposed activity. This determination is made having reviewed the testimony and the exhibits in support of that testimony. Notwithstanding a lack of proof of this differential with exactitude, it has been shown by the testimony and exhibits that the post- development peak discharge rate of runoff in the 1 in 10 year, 24-hour design storm or event can be expected to exceed that of the pre-development rate. On the associated topic of the ability of the post-development design to accommodate the differential in peak discharge rate of runoff between pre- development and post-development, Petitioner has failed to establish this proof. The modeling that was done by the Petitioner, in an effort to depict the differential as 10 acre feet with an available capacity of attenuation approximating 26 acre feet within the system of ditches, is not convincing. Nor has petitioner shown that there is sufficient storage in the retention pond, in the course of the storm event. The data offered in support of Petitioner's position does not sufficiently address accommodation of the drainage from areas surrounding the 122 acres in question, which are not part of the Duda system; the amounts of water already found in the system of ditches and canals at the onset of the storm event; the amount of water located on the crops at the onset of the storm event, which would have to be removed; and the amount of water already found in the retention pond at the time of the storm event. During the 1 in 10 year 24-hour storm, the CIF 122 acres will be protected by the 71-foot MSL dike, in that the expected elevation of Lake Apopka would not exceed 68.54 feet MSL. The dike would also protect the 122 acres in the 25, 50, and 100-year, 24-hour storm events whose elevations are anticipated to be 68.98, 69.28, and 69.56 feet MSL, respectively. As a consequence, an increase in flood stage would occur on lands other than those controlled by CIF. The amount of increase in flood stage would be approximately .046 inches during the 1 in 10 year storm, and an increasingly greater amount for the larger storms. It was not established where the amount of water which could not be staged on the 122 acres would be brought to bear through the surface flow on the 31,000 acres of water which constitute Lake Apopka. Nonetheless, that water could be expected to increase the flood stage on lands other than those of the Applicant. Possibly the dikes protecting the muck farms on the northern side of Lake Apopka could be influenced by the .046 inches in elevation due to the forces associated with the 1 in 10 year storm event, such as winds and movement of the water in the lake. This is true, notwithstanding the fact that the design goal of the dikes in the area is 71 feet MSL. The dikes are constituted of muck and are susceptible to overtopping, erosion, or blowout. By history, there have bean dike failures in the northern end of Lake Apopka, and associated increases in stage or flood stage. This incremental increase in water level in the 1 in 10 year storm event, due to the CIF development, when considered in the context with the other influences of that storm event, could possibly be the determining incident leading to dike failure in the northern perimeter of Lake Apopka. However, given the history of dike failures, prior to this potential loss of the storage area on the applicant's property, it has not been shown that the proximate cause of dike failure in the 1 in 10 year storm could be expected to be the contribution of an additional .046 inches of water on the lake surface. Those failures existed prior to the potential for the addition of water and were the result of inadequate maintenance of a structure which demanded a better quality of attention. Nonetheless, the additional amount of water could be expected to exacerbate the extent of a dike breach in any 1 in 10 year storm event that occurred subsequent to the development of the CIF 122 acres. In summary, the likelihood that the increase in elevation of water caused by the loss of storage on the subject property will be the critical event that causes a dike failure is not accepted. A dike could breach because of the influence of the storm even itself, without regard for the incremental increases in water elevation due to loss of water storage on the CIF property. The poor condition of some dikes due to less than adequate design or maintenance, would promote that dike failure and be exacerbated to the extent of more water being introduced on that property through the incremental amount of increase due to loss of storage on the CIF property. The dike failure circumstance in and of itself would not be sufficient to deny the permit application; however, the applicant had the burden of addressing the possible problem of increases in stage or flood stage on other properties, not its own, which are not protected by dikes. This showing was not made by the applicant, notwithstanding the fact that an increase in stage or flood stage could be expected to occur on property fronting Lake Apopka, which property is not protected by any form of artificial barrier. The installation of the protective dike aground the 122 areas of the CIF property in the 1 in 10 year design storm and potentially at times of lesser rainfall events, could be expected to increase the stage or flood stage on lands unprotected by dikes and thereby adversely affect lands other than those controlled by the applicant. Most of the 122 acres and the property to the east of that development and a portion of the undeveloped 80 acres in the recent Duda permit would be inundated in the 1 in 10 year storm event, prior to development. This is true because the elevation of much of that property is approximately 67.5 foot MSL. During the 1 in 10 year storm event, it would store approximately one foot of water, as presently constituted. It could also be expected to be inundated on an average of approximately once in two years. Lake Apopka is a part of a controlled system of lakes known as the Oklawaha River chain of lakes. Respondent regulates the water level in that chain of lakes by operation of a lock on the Apopka-Beauclair canal. The maximum desirable elevation of 67.5 feet MSL for Lake Apopka is a part of the regulation schedule found in Respondent's Exhibit No. 2 admitted into evidence. In the 1 in 10 year or better storm event, the Apopka-Beauclair system could not draw down the surface water at a rate faster than 27 days per foot, even assuming the lock was fully open to flow. Consequently, those properties that were suffering an, increase in flood stage on their surface could not expect to gain prompt relief through the regulation of waters in the Oklawaha River chain of lakes. Lake Apopka is an hyper-eutrophic lake. Although it is classified as Class III water body (ambient water quality) within the meaning of Section 17- 3.161, Florida Administrative Code, it fails to match that classification in terms of its actual water quality. This is as a consequence of its highly eutrophic state, brought about by the age of the lake and the contributions of man. Some of the contributors to the eutrophication have been removed from the lake area and water quality has improved. Those facilities removed were sewage treatment and citrus processing plants around the Lake Apopka rim. The muck farms remain and the quality of the water in the retention basins or ponds when compared to the receiving waters of Lake Apopka is similar in nature. Consequently, the receiving waters are not enhanced in their water quality when the retention ponds discharge water into Lake Apopka. As stated before, the retention ponds do not have as their primary purpose the treatment of water. Any water quality improvement is a secondary function of the retention pond. The retention ponds do improve the water somewhat, as described, and are adequately sized to fulfill that partial cleansing. Whether the water quality in Lake Apopka would ever improve sufficiently to allow Lake Apopka to become a more diversified habitat for fish and wildlife is not certain, even if all contributing discharges of pollutants were curtailed, to include the discharge of water from the muck farms with its high nutrient loads. Nonetheless, Lake Apopka cannot accomplish the recovery if the effluent from the muck farms continues to be introduced into the lake with the present constituents found in the water. Out of concern for the water quality in Lake Apopka, officials of the University of Florida have conducted experiments on nutrient removal which they hoped would approximate the quality of removal accomplished by transitional vegetation and swamp. (The 122 acres at issue and the western and eastern adjoining property are constituted of these water treatment zones.) This experiment of nutrient removal through use of retention ponds calls for the retention of the muck farm water for a period of six days allowing settlement of particulates and for the vegetation within those experimental retention basins to uptake dissolved nutrients. Several types of vegetation are used to gain a better quality of nutrient uptake add the vegetation is harvested every six to eight weeks to improve that performance. The experiment has shown that the quality of water discharged from the ponds utilized by the University of Florida was comparable in its quality to the natural wetlands system water discharge. The natural wetlands discharge is of a better quality than the receiving waters. Unlike the university experiment, the pond contemplated by CIF primarily emphasizes detention for a shorter period of time than was used in the experiment and allows highly eutrophic water to be mixed with that quality of water already found in Lake Apopka. The only exception to that comment is that water flowing from Wolfshead Lake, which is south of the proposed 122 acres, is a high quality of water, and through the project as contemplated, this water would be directly introduced into Lake Apopka through a flow over a natural wetlands system. This is in opposition to the present situation where the water from Wolfshead Lake flows primarily to the north through an existing canal and is mixed with water from the muck farm and is, therefore, of the eutrophic character as opposed to the high quality character. The Duda permit, which was issued, would allow the introduction of water which is similar in character to the water of Lake Apopka, through the system of ditch conveyances, placement in the retention pond, and at times, flow to the lake. In its effect, the nutrient loading which occurs by introduction of waters from that new farm, would be similar to that proposed in the CIF project. The fact of this similarity does not prohibit the district from evaluating water quality matters on the occasion of the CIF permit decision. Should the 122 acres be converted from natural vegetation to a muck farm, wildlife and fish habitat would be adversely impacted. The habitat provided by the plot is in scarce supply and is essential to the maintenance of a diversified fish population. The hardwood swamp, which is part of and adjacent to the 122 acres of the CIF application, supports benthic invertebrates, which are a food source for game fish. The type of vegetation found in the lake, due to its eutrophic state, is plankton and one of the by- products of the reproduction of that plant through the process and respiration is the destruction of the fish population. This occurs in the summer months. The plankton has replaced the emergent and submergent vegetation which once covered as much as two-thirds of Lake Apopka and now represents .05 percent of the lake. As a consequence, game fish have diminished over a period of years with plankton feeding fish predominating. Consequently, the fish population is less diverse and the removal of the vegetation becomes a significant contributor to the imbalance in fish population.
The Issue The issues for disposition are whether BJM Associates, Inc. is required to apply for and obtain a drainage connection permit pursuant to rule 14-86, Florida Administrative Code, and if so, whether BJM Associates, Inc., has failed to obtain that permit.
Findings Of Fact Respondent, BJM Associates, Inc. (BJM) is the owner and developer of Rosetta Villas Subdivision, located in Orange County, Florida, (Respondent’s prehearing Statement) Petitioner, Department of Transportation (D0T) purchased an adjacent parcel, including a retention pond, “Pond A”, in 1991, in anticipation of a road-improvement or extension project for Maitland Boulevard. The pond was purchased from Rose Industrial Park, a permitted development also adjacent to the pond. Rosetta Villas Subdivision received Orange County subdivision approval in 1986 and 1988, and a St. John’s River Water Management District permit for stormwater facilities in 1991. Lots have been platted, streets have been constructed and homes have been sold. Rosetta Villas Subdivision includes a water retention pond on-site, built in 1995. There is a pipe from that pond which discharges water into a ditch that is partially within the DOT right of way. The ditch has a 30-inch concrete pipe which discharges into DOT’s Pond A. There is some indication in the record that a diversion ditch was part of an over-all permit for the Rose Industrial Park development prior to DOT’s purchase of Pond A. The diversion ditch was intended to convey stormwater around, and not into Pond A. The diversion ditch south of Rosetta Villas and north of Pond A does not convey Rosetta Villas’ run off around Pond A. Instead the 30-inch concrete pipe conveys Rosetta Villas’ overflow water into Pond A. The 30-inch concrete pipe was constructed by BJM in 1995 after an existing, much smaller, pipe became clogged. BJM contends that the pipe was replaced at the direction of someone from DOT. While that contention is not disputed, nothing in this record supports any suggestion that DOT is now estopped from requiring a drainage connection permit. At hearing BJM’s own expert witness opined that the 30-inch pipe which now discharges into Pond A requires a connection permit. (Transcript, p. 130) BJM does not have that permit and, after meetings and extensive discussion with DOT staff, has not applied for the permit.
Recommendation Based on the foregoing, it is hereby, RECOMMENDED: that the Department of Transportation issue its Final Order requiring BJM to apply for a drainage connection permit pursuant to chapter 14-86, Florida Administrative Code. DONE and ORDERED this 24th day of February 1997 in Tallahassee, Leon County, Florida. MARY CLARK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 24th day of February 1997. ENDDNOTE 1/ BJM presented extensive evidence regarding the diversion ditch or swale and its intended purpose. It may be possible for BJM to redirect its out-flow however, the current status of the drainage system. COPIES FURNISHED: Francine M. Ffolkes, Esquire Department of Transportation Burns Building, Mail Station 58 608 Suwannee Street Tallahassee, Florida 32399-0458 Bernard J. Martin, Esquire 506 Wymore Road Winter Park, Florida 32789 Pamela Leslie, General Counsel 562 Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Ben G. Watts, Secretary Attn.: Diedre Grubbs Haydon Burns Building, MS 58 605 Suwannee Street Tallahassee, Florida 32399-0450
Findings Of Fact The Applications. Permit DC51-189086 (Moon Lake Road Site). The County's application for Permit DC51-189086 was filed on 11/13/90. It sought to construct Moon Lake Road WWTP, Sprayfield, and Percolation Pond System. The design treatment capacity sought for Moon Lake Road WWTP was .800 MGD, for the sprayfield was .215 MGD, and for the percolation pond system was .185 MGD. The application for Permit DC51-189086 was denied on 2/13/92. Notice of the proposed agency action was published in accordance with Department requirements, and the County timely petitioned for a formal administrative hearing. On 11/16/93, the County amended its application for Permit DC51-189086 to exclude the proposed Moon Lake Road WWTP, in order to defer construction of the WWTP to a later date. On 1/5/94, the County amended its application for Permit DC51-189086 to withdraw the request for a surface water permit and a stormwater permit. Due to the recent interagency agreement between the Department and SWFWMD, the County decided to defer surface water and stormwater permitting for this facility until after the construction permit was issued. Permit DO51-194674 (Wesley Chapel WWTP/Oakley Grove Site). The County's application for Permit DO51-194674 was timely filed on 2/12/91. The application sought authorization to operate the County's Wesley Chapel Wastewater Treatment Plant (WWTP) at .750 MGD and Oakley Grove Percolation Pond System at .600 MGD. The application for Permit DO51-194674 was denied by the Department on 7/18/91. The notice of permit denial alleges that the County failed to submit requested additional information, that an inspection of the site had revealed a 6-inch irrigation pipe undermining a percolation pond berm, and that the Certificate of Completion of Construction did not accurately reflect observed aspects of the disposal area. The County timely petitioned for administrative hearing. The application for Permit DO51-194674 was amended on 11/16/93 to limit the treatment capacity of Wesley Chapel WWTP to .600 MGD. Permit DO51-199516 (Ryals Road Site). The portion of this case concerning Permit DO51-199516 involves the County's request to reactivate operations at the Ryals Road Percolation Pond System. The requested disposal capacity is .1075 MGD, which is about half of its disposal capacity when it previously was in operation. Ryals Road Percolation Pond System is a reuse facility owned by the County, and constructed in 1985 as a replacement for nearby Oaks Royal Percolation Pond, where a sinkhole had developed. The County's initial construction permit application (#DC51-100407) for the Ryals Road Percolation Pond System was filed with the Department in 1985. The Department granted the application for Permit DC51-100407 on 7/10/85. Ryals Road Percolation Pond System's permitted disposal rate was about .200 MGD. Construction of Ryals Road Percolation Pond System was completed in 1986, and operation began immediately thereafter due to the appearance of a new sinkhole at the Oaks Royal Percolation Pond. The Department was advised of the new sinkhole in the Oaks Royal Percolation Pond in 1/86 and in 2/86 and was advised that reclaimed water from Oaks Royal WWTP was being diverted to Ryals Road Percolation Pond System. The Ryals Road Percolation Pond System operated from 1986 through 1989. It received reclaimed water from Oaks Royal WWTP. A sinkhole developed in Ryals Road Percolation Pond System in 1987. The County backfilled the sinkhole and advised the Department of the problem. The County's initial operation permit application (#DO51-142683) for Ryals Road Percolation Pond System was filed with the Department in 1989. The Department granted the County's application for Permit DO51-142683 in 8/89. It does not contain any permit conditions dealing with the potential for sinkhole formation at the Ryals Road Percolation Pond System. At the time, the Department anticipated that the Ryals Road Percolation Pond System would be in operation for only a year or two. The County operated Ryals Road Percolation Pond System under Permit DO51-142683 until sometime in 1990, without further sinkhole or land subsidence problems. Ryals Road Percolation Pond System was taken out of service in 1990, when Oaks Royal WWTP was abandoned. Oaks Royal WWTP was taken out of service because, after completion of Southeast WWTP, it no longer was needed. On a routine monitor well sampling report to the Department dated April 30, 1990, the County's laboratory supervisor noted that the Oaks Royal WWTP had been taken out of service prior to January, 1990. On a subsequent report dated May 29, 1990, the County's laboratory supervisor noted that monitor wells at the Ryals Road site had been destroyed and that no ground water samples could be taken or reported. This report also noted that no arrangements were being made to replace the monitor wells since the Oaks Royal WWTP was "no longer on-line." The County never formally withdrew or surrendered its operation permit DO51-142683 for the operation of the Oaks Royal WWTP and Ryals Road Percolation Pond System. The Department never took action to revoke or terminate the Oaks Royal/Ryals Road operation permit and never gave the County notice of intent to do so. The County first notified the Department of its intent to "revive" the Ryals Road Percolation Pond System through letters dated 4/12/91 and 4/18/91. The County attempted to reactivate the facility by letter rather than permit application because it believed the facility was already authorized to operate pursuant to Permit DO51-142683. After receiving no response to its 4/91 letters, the County sent the Department a follow-up letter dated 6/10/91 again asking to "revive" Ryals Road Percolation Pond System. This letter refers to the County's request to reactivate the system as a "minor modification" to Permit DC51-150232C, which authorized construction activities at the County's Southeast WWTP. The letter sought a minor modification of the construction permit instead of an amendment to Permit DO51-142683 because the County was unsure of the status of the Ryals Road Percolation Pond System operation permit and had been advised by Department employees that this would be the most expeditious way to handle its request. The County's request for a minor modification was assigned permit identification number DO51-199516, and the "O" signifies an operation permit application. The County does not know why its request to reactivate Ryals Road Percolation Pond System was treated by the Department as a new operation permit application. The County first learned that its request to reactivate Ryals Road Percolation Pond System had been assigned a new operation permit identification number when it received notice of permit denial. The "application" for Permit DO51-199516 was denied on 8/26/91. The County timely petitioned for a formal administrative hearing. The Notice of Permit Denial for Permit DO51-199516 alleged that Ryals Road Percolation Pond System is not suitable for rapid rate disposal due to the high potential for subsidence activity, that this potential is demonstrated by the appearance of sinkholes in 1985, 1986 and 1987, and that boring logs and other information in the ground water monitoring plan shows a potential for sinkhole formation. Regardless of the confusion in processing the County's request regarding the Ryals Road site, the County announced clearly and unequivocally at final hearing that it no longer wanted its request to reactivate the Ryals Road Percolation Pond System to be treated as a request for a modification of Construction Permit DC51-150232C (for construction of the Southeast WWTP). Rather, it wanted its request for minor berm restoration work to be treated as exempt activity under F.A.C. Rule 17-4.040(1)(a), and it wanted the installation of new groundwater monitoring wells to be handled under Ground Water Monitoring Plan Condition 3 of Permit DO51-142683 (the Oaks Royal/Ryals Road operation permit). Alternatively, and only if it was determined that Permit DO51-142683 no longer was in effect, the County wanted its request to be treated as a request for a modification of Construction Permit DC51-150232C (for construction of the Southeast WWTP) or as an application for a new operation permit. Permit DO51-142683 (the Oaks Royal/Ryals Road operation permit) expired on August 5, 1994. Drainage Ditches in Oakley Grove and Moon Lake Percolation Pond Systems. Drainage ditches are present at the Oakley Grove and several other County Percolation Pond Systems; they are proposed for the Moon Lake Percolation Pond System. (Drainage ditches are not present at the Ryals Road Percolation Pond System.) A "relief drainage" system is a system of drainage ditches used to lower a high water table, which is generally flat or of a very low gradient. There are 4 types of relief drainage ditch systems: parallel, herringbone, double main and random. Correspondence between the County's consultants and the Department usually described the on-site drainage ditches at the County's percolation pond systems as "perimeter ditches." Although the County's ditches do not necessarily completely surround each pond, it is a fair description of the ditches. They are a network of ditches that, together, surround the sites. The network varies to some degree from site to site. Moon Lake Road Percolation Pond System is designed to have double main type drainage ditch system; Oakley Grove Percolation Pond System has a random type ditch system. The County's consultants began referring to the ditches as "perimeter ditches" in part because it was a term used by members of the Department's staff. But both the Department and the County knew what was meant by "perimeter ditches" or similar terms, and the County only stopped using those terms in furtherance of its legal arguments in this case. Ground water will seep into the relief drainage ditches at the County's percolation pond system. During and after any rainfall event, water infiltrating into the ground in close proximity to a drainage ditch will be encouraged to seep into the ditch. During seasonally wet periods, when ground water elevations tend to rise above normal levels, ground water both on and off- site will seep into the ditches. After extreme rainfall events delivering large volumes of water to the site, elevated ground water mounding would occur and ground water will seep into the drainage ditches. The invert elevations of the relief drainage ditches located at the County's percolation pond systems were set to the approximate normal water level elevation. As a result, the ditch inverts will normally be wet, and ground water normally will seep into ditches in normal weather conditions even if the water table is not being recharged by reclaimed water. The principal design goals for the drainage features located at the County's percolation pond systems are: (a) ditch construction provides an inexpensive source of fill material; (b) using on-site ditch material allows pond bottoms to be kept higher above the water table; (c) ditches buffer adjacent property from recharge impacts; (d) ditches buffer the site from adjacent land use practices; (e) ditches provide a constant boundary condition by flattening seasonal fluctuation in rainfall, runoff, water table elevations and the potentiometric surface of the deeper aquifer system; (f) ditches serve to quickly drain rainfall that may hinder the recharge performance of the percolation ponds; (g) ditches provide a visible indication of site performance; and (h) ditches are part of the site's stormwater and overflow system. Although the collection of reclaimed water in the ditches is not the primary goal of these drainage features, it is recognized that some reclaimed water would be collected in the ditches as a result of the use of the drainage features to improve the performance of the percolation ponds, depending on the application rate and weather conditions. It is possible that reclaimed water applied to the percolation ponds will percolate into the ground and combine with native ground water, and that the resulting mixture will infiltrate the drainage ditches. As with all land application systems, water applied to percolation ponds will migrate downgradient in the surficial aquifer system and blend with other waters recharging this system. Surface waters downgradient from percolation pond cells, whether in the relief drainage ditches or off-site, will receive a blend of rainwater, direct runoff, water originating from the percolation ponds and ground water, in various proportions. Most surface water is designed to leave the Oakley Grove site at the eastern discharge point. Surface water leaving the site at this point flows east under Interstate 75 and into a forested wetland, approximately 150 acres in size, located to the east of I-75. Surface water then flows from the southwest corner of the wetland into a linear wetland and channel system, which conveys water west, ultimately discharging into Big Cypress Swamp, another wetland system several thousand acres in size. The other discharge point is from the southwestern corner of the Oakley Grove site. From the southwest outfall, surface water flows into a wetland and channel system that conveys water west and then north into Big Cypress Swamp. Surface water also is designed to discharge from the Moon Lake Road site via two outfalls. Both are located on the east side of the site. Discharges would enter an adjacent cypress wetland system consisting of hundreds of acres and meander approximately two miles in a northeasterly direction to a point of intersection with the upper reaches of the Pithlachascotee River. Status of Reclaimed Water Travelling 100 Feet or More from Percolation Pond Cells to Drainage Ditches. The Department generally uses 100 feet as the allowable setback distance between a land application system and adjacent surface water. This practice is derived from Department rules and from the Department's expectation that effluent percolating into the ground water and travelling 100 feet through the soil no longer will have the characteristics of effluent, for permitting purposes, when it reaches the surface water body. One hundred feet generally is recognized in the engineering field as usually sufficient area to permit adequate treatment, dilution and mixing of effluent as it travels through the soil matrix so to be virtually indistinguishable from normally occurring ground water, for permitting purposes, when it reaches the surface water body. The treatment, dilution and mixing of effluent occurs through a variety of chemical, biological, absorptive and physical processes that are well documented in the field of sanitary engineering. Although the Department generally uses 100 feet as the allowable setback distance between a land application system and adjacent surface water, the facts of individual cases must be considered to determine whether treatment afforded by 100 feet of travel through the ground makes reclaimed water "virtually indistinguishable" from other ground water so as to be virtually indistinguishable from naturally occurring ground water, for permitting purposes, when it reaches the surface water body. This is reflected in the fact that Department's rules make 100 feet the minimum setback distance. In contrast to diffuse discharges to nearby surface water bodies, the Department's rules treat discharges to surface waters via a ditch system that collects and concentrates reclaimed water differently. By rule, such discharges require a surface water discharge permit. If reclaimed water travels through the ground far enough before infiltrating drainage ditches, it would be treated and diluted to the point that it is in fact indistinguishable in chemical or biological composition from native ground water and no longer should be considered reclaimed water or effluent. How far is the dispositive question in determining whether a surface water discharge permit will be required. Setback Distance from On-Site Ditches to Percolation Ponds at Oakley Grove and Moon Lake Road Sites. Relief drainage ditches at Moon Lake Percolation Pond System are designed to be located 100 feet or more from the percolation ponds, measured from the toe of the slope of the pond to the ditch invert. Relief drainage ditches at Oakley Grove Percolation Pond System also were designed to be located 100 feet or more from the percolation ponds, measured from the toe of the slope of the percolation pond to the ditch invert. However, primarily as a result of changes to the drainage system required by SWFWMD as part of its permitting process, and minor siting imperfections which occurred during construction, parts of the drainage ditch system at Oakley Grove Percolation Pond System are located closer than 100 feet from the percolation ponds. To locate all Oakley Grove drainage ditches 100 feet or more from the percolation ponds, it will be necessary to reduce the size of the ponds. In the new configuration, the design loading rate would have to be increased to .8 from .58 gpd/ft2 (gallons per day per square foot) of pond bottom in order to maintain the .600 MGD design loading capacity of the Oakley Grove Percolation Pond System. Even assuming the predicted hydraulic capacity of Oakley Grove site, the actual disposal capacity for the site cannot be determined until it is determined how much of a reduction in pond size is required. The County has not made those determinations yet. Seepage of Reclaimed Water from Percolation Ponds at Oakley Grove Percolation Pond System to Drainage Ditches. Although constructed with a design disposal capacity of .600 MGD, until recently the County has loaded the ponds at Oakley Grove under the Oakley Grove construction permit at an actual average rate of approximately .200 MGD. (Maximum actual loading has been approximately .250 to .270 MGD.) This average loading rate required effluent to be loaded onto the ponds at the rate of approximately .19 gpd/ft2 of pond bottom. In November, 1993, the County stopped loading the ponds at Oakley Grove. During site visits to Oakley Grove on 4/15/91, 7/11/91, 7/12/91, 8/27/91, 10/12/93 and 12/7/93, Department personnel observed that ditch inverts, and some points even higher on berms on the pond side of ditch inverts, were wet and that water had collected in some the ditches, while other ditches and surface water outfalls were not wet. The wet ditches and berms seemed to correspond with the loading of ponds. Rainfall at the Oakley Grove site during the 10-day period immediately preceding these Department site visits was as follows: Site Visit Inches of rainfall Gallons of rainfall 4/15/91 3.58 9,786,659 7/11/91 5.41 14,789,337 7/12/91 5.60 15,308,742 8/27/91 2.91 7,955,078 10/12/93 1.02 2,788,378 12/7/93 0.03 82,011 The precise source of all of the water saturating the wet berms and ditch bottoms observed by the Department personnel was not clear from the evidence. Some of the wet berms and ditch bottoms probably were the result of rainfall that collected in portions of the ditch system due to uneven grading during construction, modifications to the ditch system required by SWFWMD, and the County's maintenance practices. But the evidence also suggests that seepage was occurring from the percolation ponds to the drainage ditches, in some cases at points higher on berms on the pond side of ditch inverts. It also was not clear from the evidence whether the apparent seepage from the percolation ponds into the drainage ditches was occurring more or less than 100 feet from the toe of the slope of the percolation ponds. If less, the seepage may be an indication that the hydraulic capacity of the site is not as great as predicted by computer flow models run in support of the application for a construction permit for the Oakley Grove site. Oakley Grove was designed to recharge the surficial aquifer without short-circuiting the designed 100 foot setback from the percolation ponds to the drainage ditches, even at the design disposal capacity of .600 MGD. (Cady Prefiled, 175). The evidence of seepage at .200 MGD is an indication that the hydraulic capacity of the site may not be as great as designed. Based on the assumed hydraulic capacity of the site, water balances prepared by the County assert that none of the water in the ditches would come from the percolation ponds at .200 MGD, or even at .300 MGD. The evidence of seepage at .200 MGD is another indication that the hydraulic capacity of the site may not be as great as predicted by models run in support of the application for a construction permit for the Oakley Grove site. The Oakley Grove relief drainage ditches were authorized by a SWFWMD Management and Storage of Surface Water ("MSSW") Permit (i.e., Permit #405124, issued 7/12/89). This permit established two surface water quality monitoring sites for the off-site discharge of water from the relief drainage ditches and requires that any water discharged off-site meet surface water quality standards. The County has collected data from these monitoring sites since 1991. This data does not indicate any violations of surface water quality standards due to the discharge of water from the relief drainage ditches to off- site receiving waters. (SWFWMD has never instituted an enforcement or compliance action against the County as a result of discharges from the relief drainage ditches to receiving waters, and Permit #405124 remains active.) However, the data indicate that the surface water quality has been worse, with respect to several parameters, than the quality which the County predicts for application rates of .300 MGD and higher (for NOx-N, as high as .600 MGD.) This may be another indication that the hydraulic capacity of the site is not as great as predicted by models run in support of the application for a construction permit for the Oakley Grove site. MGD. No load testing was done at Oakley Grove at more than .250 to .270 Even at the historical loading rate, the evidence did not reflect that the County undertook to determine whether, under different weather conditions, reclaimed water was coming to the surface either in the drainage ditches or higher on berms on the pond side of ditch inverts. Nor was there evidence that systematic testing of the water quality in the ditches was conducted. In light of the evidence of seepage into ditches, either more or less than 100 feet from the toe of the slope of ponds, it was not proven that the site has the capacity to accept effluent at the design rate of .8 gpd/ft2 of pond bottom. It was, however, proven by evidence introduced as Department Exhibit 32 that .075 MGD is a hydraulic loading rate at which no discharge to the on- site ditch/swale features would occur under normal wet season groundwater conditions. Alleged Settlement Offer. Department Exhibit 32 is a January 27, 1992, letter from the County to the Department. It enclosed a letter to the County from the County's engineering consultant and an engineering report from a new hydrogeologic consultant to the County. The January 27, 1992, letter referenced a December 16, 1991, meeting "concerning acceptable rated disposal capacity" for the Oakley Grove Percolation Pond System and states that the enclosed hydrogeology report "verifies the rated capacity [for Oakley Grove] at 75,000 gpd." (The report stated that its purpose was "to estimate a hydraulic loading rate at which no discharge to the on-site ditch/swale features would occur under normal wet season groundwater conditions.") It concluded that a hydraulic loading of the Wesley Chapel WWTP can be justified by combining the 75,000 gpd disposal capacity for Oakley Grove with the 100,000 gpd already permitted for the Saddlebrook Village Percolation Pond System. Nowhere is Department Ex. 32 in fact identified as a settlement offer or as having any connection to a settlement offer in this or any other case. It is found that Dept. Ex. 32 was part of the process by which the parties successfully negotiated the settlement of the County's permit for construction of a modification to the Wesley Chapel WWTP, Permit Application No. DC51-205143. The Department issued a permit for construction of a modification to the Wesley Chapel WWTP (with a .075 MGD limit on disposal at Oakley Grove) on August 31, 1992. The County acceded to reduction of the actual disposal capacity at Oakley Grove pending the disposition of its application for an operation permit for Oakley Grove, and construction of the modifications was completed in late 1993. Ground Water Quality at Oakley Grove. During the time that Oakley Groves has been in operation, monitor wells have detected no violations of G-II ground water quality standards except for nitrates. Analysis of initial ground water samples collected from monitor wells at Oakley Grove Percolation Pond System in approximately January, 1991, detected no nitrate violations. The first quarterly reports after the County started loading the ponds began showing exceedances for nitrates. Exceedances continued to be reported in every quarter until the County stopped loading the ponds in November, 1993. Analysis of ground water samples collected from monitor wells at Oakley Grove Percolation Pond System demonstrates that nitrate concentrations have gone down over time. On average for the entire Oakley Grove Percolation Pond System, including upgradient background monitoring wells, nitrate concentrations have remained below the 10 mg/l Class G-II ground water quality standard for nitrate from approximately August, 1992, until the County stopped loading the ponds in November, 1993. The most recent quarterly sampling of the monitor wells at Oakley Grove Percolation Pond System occurred in 11/93. The report was submitted to the Department in 1/94. It showed no exceedances of the Class G-II ground water quality standard for nitrate in any of the monitor wells. However, it is not clear from the evidence whether the reports reflected the effects of reclaimed water being applied to the site. The reclaimed water applied to Oakley Grove Percolation Pond System probably is not the sole reason for the elevated nitrate concentrations that have been reported. Agricultural fertilizer was used at the site prior to acquisition by the County. Nitrates from the fertilizer have remained in the soil matrix. The loading of the ponds began to liberate the nitrates from the soil matrix and to flush the nitrates downgradient to the monitor wells. As the preexisting nitrates have been flushed out, nitrate levels have dropped. Analysis of ground water samples collected from monitor wells at Oakley Grove Percolation Pond System suggests that operation of the facility at historical loading rates (approximately .200 MGD) probably will not result in continued ground water quality violations. Systematic load testing would help answer the question more definitively. Surface Water Quality Considerations. The County did not intend for its percolation pond disposal systems either at Oakley Groves or at Moon Lake Road to result in a surface water discharge that would require a surface water discharge permit, and it has not applied for one at either site. Not having applied for a surface water discharge permit, the County has not submitted either a water quality-based effluent limitation (WQBEL) study or a plan to do a WQBEL study. In lieu of a WQBEL study, the County presented evidence of surface water quality consisting primarily of an evaluation of estimated predicted contributions, concentrations and characteristics of inputs entering the drainage ditches and a prediction of water quality characteristics at the point of discharge, given various application rates. Procedures commonly used and relied upon by water resource and sanitary engineers can be used to estimate the predicted quality of water discharged off-site from the relief drainage ditches under various reclaimed water application rates. The County utilized these procedures to predict, first, expected quality of water in the drainage ditches and, second, quality of water expected to be discharged off-site under various reclaimed water application rates. In applying the procedures, the County used lower removal efficiencies than those allowed in the EPA Design Manual and did not take into account additional pollutant removal efficiencies that will occur as the water in the ditches migrates off-site, resulting in higher predicted levels of contaminants in the water discharged off-site. The County also assumed the accuracy of the studies and models supporting the disposal capacities for the sites. Utilizing these procedures and assumptions, the County's evidence estimated the following predictions for Oakley Grove: --At an application rate of .300 MGD, it was estimated that the water quality characteristics of any off-site discharges from the relief drainage ditches at the Oakley Grove site would be: NH3-N (ammonia) = 0.129 mg/l; NOx- N (nitrite-nitrate)= 0.141 mg/l; organic nitrogen = 0.177 mg/l; total nitrogen = 0.477 mg/l; CBOD5 (carbonaceous biological oxygen demand)= 0.2 mg/l; total phosphorus = 0.04 mg/l; and fecal coliform = 21 per 100 ml. --At an application rate of .400 MGD, it was estimated that the water quality characteristics of any off-site discharges from the relief drainage ditches at the Oakley Grove site would be: NH3-N = 0.199 mg/l; NOx-N = 0.233 mg/l; organic nitrogen = 0.192 mg/l; total nitrogen = 0.672 mg/l; CBOD5 = 0.2 mg/l; total phosphorus = 0.056 mg/l; and fecal coliform = 20 per 100 ml. --At an application rate of .500 MGD, it was estimated that the water quality characteristics of any off-site discharges from the relief drainage ditches at the Oakley Grove site would be: NH3-N = 0.549 mg/l; NOx-N = 0.695 mg/l; organic nitrogen = 0.268 mg/l; total nitrogen = 1.65 mg/l; CBOD5 = 0.2 mg/l; total phosphorus = 0.25 mg/l; and fecal coliform = 15 per 100 ml. --At an application rate of .600 MGD, it was estimated that the water quality characteristics of any off-site discharges from the relief drainage ditches at the Oakley Grove site would be: NH3-N = 0.759 mg/l; NOx-N = 0.975 mg/l; organic nitrogen = 0.314 mg/l; total nitrogen = 2.23 mg/l; CBOD5 = 0.2 mg/l; total phosphorus = 0.36 mg/l; and fecal coliform = 12 per 100 ml. --At all reclaimed water application rates at the Oakley Grove site, it was estimated that TSS (total suspended solids) in the reclaimed water would be completely removed during migration through the soil before it reaches the relief drainage ditch. Utilizing the same procedures and assumptions, the County's evidence estimated that the water quality characteristics of any off-site discharges from the relief drainage ditches at the Moon Lake Road site at the design application rate of .185 MGD would be: NH3-N = 0.769 mg/l; NOx-N = 0.995 mg/l; organic nitrogen = 0.297 mg/l; total nitrogen = 2.25 mg/l; CBOD5 = 0.2 mg/l; total phosphorus = 0.37 mg/l; and fecal coliform = 3 per 100 ml. At the reclaimed water application rate proposed for Moon Lake Percolation Pond System, the County estimated that TSS in the reclaimed water would be completely removed during migration through the soil before it reaches the relief drainage ditch. Using those predictions of the water quality characteristics of off- site discharges from the relief drainage ditches, the County presented evidence that predicted generally and in a conclusory fashion that surface water discharges would not adversely impact the environment downstream. However, as already indicated, water quality monitoring for SWFWMD indicates water quality that has been worse at historical application rates, with respect to some parameters, than the quality which the County predicts for application rates of .300 MGD and higher (for one parameter, as high as .600 MGD). County Ex. 162 summarized the surface water monitoring results at Oakley Grove for November, 1992, through November, 1993: East Outfall at I-75: NH3-N range less than 0.07-0.721 mg/l, and mean 0.157 mg/l; NOx-N range, less than 0.1-3.04 mg/l, and mean 0.416 mg/l; organic nitrogen range 0.250-1.10 mg/l, and mean 0.558 mg/l; total nitrogen range 0.510- 3.77 mg/l, and mean 1.31 mg/l; CBOD5 range less than 1-2.0, and mean 1.1 mg/l; total phosphorus range 0.020-0.190 mg/l, and mean 0.054 mg/l; T.S.S. range 1-16 mg/l, and mean 3.1 mg/l; and fecal coliform range 1-5300 per 100 ml, and mean 352 per 100 ml. South Outfall at Trailer Park: NH3-N range less than 0.07-0.270 mg/l, and mean 0.125 mg/l; NOx-N range, less than 0.1-0.810 mg/l, and mean 0.285 mg/l; organic nitrogen range 0.285-1.01 mg/l, and mean 0.631 mg/l; total nitrogen range 0.533-1.85 mg/l, and mean 1.04 mg/l; CBOD5 range less than 1-3.0, and mean 1.4 mg/l; total phosphorus range 0.010-0.120 mg/l, and mean 0.053 mg/l; T.S.S. range 1-16 mg/l, and mean 3.9 mg/l; and fecal coliform range 2-560 per 100 ml, and mean 50 per 100 ml. In addition, contrary to the County's predictions, estimates and arguments that surface water discharges from the Oakley Grove site will be "virtually indistinguishable from naturally occurring ground water," the surface water quality monitoring for SWFWMD at historical application rates indicates that water quality has been clearly distinguishable from naturally occurring ground water. The surface water discharges from the Oakley Grove site clearly have had higher levels of NOx-N and organic nitrogen than the water quality measured at the background monitoring station. In addition, pH levels have been significantly higher (approximately 7.35 versus 5.81). As previously found, the evidence suggests that seepage from the percolation ponds to the drainage ditches has occurred at the Oakley Grove site at application rates of approximately .200 MGD. That evidence belies the assumptions underlying the County's surface water quality predictions at Oakley Grove and suggests that the site may not have the hydraulic and disposal capacities on which the surface water quality predictions for Oakley Grove were based. Until the actual hydraulic capacity and disposal capacity of the Oakley Grove site are determined, it is not possible to accurately predict the quality of water discharged off-site from the relief drainage ditches under various reclaimed water application rates (except that there was evidence to prove that no seepage into the ditches would occur at application rates of up to .075 MGD.) In contrast to the Oakley Grove site, no load testing of the Moon Lake Road site is possible until it is constructed. The County presented evidence that nitrogen would be absorbed by plants and sediments downstream from the point of discharge. However, the evidence assumed that discharges would take place only in the wet season. Potential downstream impacts resulting from a dry season discharge would depend upon: (1) the amount of water coming off the site; (2) the amount of water in the receiving wetlands; (3) the duration of the discharge; and (4) the frequency of the discharge. The County's evidence did not examine the impact of discharges under those conditions. The County did not present evidence quantifying the amount of anticipated inorganic nitrogen discharge, the rate of uptake in sediments or plants, and the impacts downstream. The potential for imbalance of flora and fauna downstream, the biological integrity downstream, and degradation downstream likewise were addressed only in a general and conclusory fashion. No in-depth study of downstream biology was completed by the County. As for pH, there was evidence that the background wetland had a pH of 5.81 in standard units, while the ditch discharge has had a pH of 7.35 in standard units. Standard units of pH are logarithmic values. The numbers are actually powers of 10 and cannot simply be added together and divided by 2 to get an average pH. To get an average pH, you have to convert the pH from the logarithmic value to the actual concentration of the hydrogen ion, take the average, and then convert the average to a logarithmic value. Using this method, the average of a pH of 5.81 standard units and a pH of 7.35 standard units equals 6.1 standard units. Wetlands are very sensitive to the decreases in acidity reflected by higher pH values. The County's predicted surface water quality analyses did not address pH at all. The County's evidence did not include an examination of existing downstream conditions and projecting potential discharge impacts. The County did not model dissolved oxygen downstream of discharge points and did not survey the biological community of the receiving waters regarding any discharge to determine what impact, if any, a potential discharge would have on waters of the state. Surface water quality considerations were not assessed in relation to the volume and frequency of the discharge. In addition, the County did not sample and analyze water quality in downstream receiving waters. Other Considerations at Moon Lake Road In evaluating the County's Moon Lake Road application for completeness, the Department requested that the County conduct a fracture trace analysis and, if it indicated a higher likelihood of subsidence or sinkholes, a ground-penetrating radar (GPR) study. The County refused to do either, citing a desire to save County taxpayers money. Karst geology is typical in Pasco County. The County's site specific study of the Moon Lake Road site indicates the potential for karst activity by the presence of depressional features within and immediately adjacent to the site. It also indicates the presence of sinkholes on an immediately adjacent property. Starkey Wellfield is a regional public water supply wellfield located in Pasco County, which is part of the water supply network operated by West Coast Regional Water Supply Authority ("WCRWSA"). Starkey Wellfield currently operates under a consumptive use permit ("CUP") issued in 1988. The CUP authorizes the production of water from this facility at the annual average rate of 15 MGD and the maximum rate of 25 MGD. The nearest production well at the Starkey Wellfield is located slightly over half a mile from Moon Lake Road Sprayfield and slightly less than three-quarters of a mile from the Moon Lake Road Percolation Pond System. Water levels at the Moon Lake Road site probably will decline only about 0.7 foot due to the production of water from Starkey Wellfield. This decline is too small to significantly increase the potential for sinkhole formation or subsidence at the Moon Lake Road site. If the Moon Lake Road Percolation Pond System and Sprayfield can be operated in a safe and environmentally sound manner, it might be able to provide valuable recharge to the water table and the lower lying aquifer units. (This could reduce impacts caused by the wellfield.) But if there already is a sinkhole, or the high potential for one, at the Moon Lake site, use of the site for the disposal of reclaimed water could have a serious adverse effect on the Starkey Wellfield public water supply. Under these circumstances, it is found that the County has not yet given reasonable assurances that the Moon Lake Road site can be operated in a safe and environmentally sound manner. Evidence on Elements of Estoppel. The "Representations." Prior to the filing of the pending Oakley Grove operation permit application and Moon Lake Road construction permit projects, the Department had evaluated and permitted other similar County percolation pond systems (utilizing a system of drainage ditches to improve performance during wet weather conditions) in other locations. Saddlebrook Village Saddlebrook Village Percolation Pond System has a design disposal capacity of .15 MGD and a permitted capacity of .098 MGD. The initial construction permit application (#DC51-140007) for this facility was filed in 9/87. The Department issued Permit DC51-140007 on 12/21/87. Specific Conditions 7 and 8 of Permit DC51-140007 address the relief drainage ditch system. These conditions require sampling and analysis of any off-site discharge from these ditches for primary drinking water standards, flow, dissolved oxygen ("DO"), pH, biological oxygen demand ("CBOD5") and total suspended solids ("TSS"). The County accepted those conditions. Saddlebrook Village Percolation Pond System was constructed pursuant to Permit DC51- 140007. Thereafter, the County applied for a construction permit (#DC51-145550) in 2/88 to expand the system's disposal capacity to .250 MGD. The application sought to construct additional percolation pond basins and extend the ditch system to the new pond area. The Department approved the County's application for Permit DC51- 145550 on 7/26/88. The permit issuance was preceded by an Intent to Issue finding that the County had provided reasonable assurances that the modified facility could be constructed and operated in accordance with applicable rules and standards. Specific Conditions 6, 6A and 7 of Permit DC51-14550 address the drainage ditch system. These conditions limit flow out of the drainage ditches to the rainy season and then only when the perimeter ditch flow does not exceed the upstream flow of the receiving water. The conditions also establish maximum effluent limits of 5 mg/l for CBOD5 and TSS, 3 mg/l for total nitrogen, 1 mg/l for total phosphorus and non-detectable for fecal coliform. Finally, the conditions require sampling and analysis of any off-site discharge from these ditches for flow, primary and secondary drinking water standards, dissolved oxygen, total nitrogen, total phosphorus, fecal coliform, pH, CBOD5, and TSS. The County accepted those conditions. Saddlebrook Village Percolation Pond System has operated pursuant to Permit DC51-145550, as needed through the final hearing. The surface water quality information required pursuant to Specific Conditions 6, 6A and 7 of Permit DC51-14550 has been presented to the Department. Off-site discharges from the drainage ditches have not resulted in violations of water quality standards or violations of Permits DC51-140007 and DC51-14550. Also, the Department has never instituted an enforcement or compliance action due to discharges from the relief drainage ditches to off-site receiving waters. Saddlebrook Village Percolation Pond System was never upgraded to the .250 MGD capacity authorized by Permit DC51-14450. The County never applied for an operation permit covering this facility because the evolution of its wastewater system and changes in land use patterns resulted in the development of other disposal sites. Shady Hills Shady Hills Percolation Pond System is another of the County's percolation pond sites. Its design disposal capacity is .650 MGD, and its permitted capacity is .400 MGD. The County's initial construction permit application (#DC51-160307) for Shady Hills Percolation Pond System was filed in 1/89 or 2/89. The Department approved the County's application for Permit DC51- 160307 on 6/7/89. Permit issuance was preceded by an Intent to Issue dated 5/18/89 finding the County provided reasonable assurances that the facility could be constructed and operated according to applicable rules and standards. Initially, Permit DC51-160307 did not contain special conditions addressing the presence of drainage ditches. However, it was amended on 7/24/89, and the amended permit was assigned identification number DC51-160307A. Specific Conditions 3 and 4 of Permit DC51-160307A address the drainage ditch system and require that the drainage ditch system must be maintained to preclude off-site discharge of pollutants and that any water discharged off-site must meet state water quality standards. Shady Hills Percolation Pond System was constructed pursuant to Permit DC51-160307A, and has operated from late 1990 to present. Off-site discharges from the drainage ditches have not resulted in violations of water quality standards or violations of Permit DC51-160307A. Also, the Department has never instituted an enforcement or compliance action as a result of discharges from the relief drainage ditches to off-site receiving waters. The County never applied for an operation permit covering Shady Hills Percolation Pond System because the associated WWTP is being expanded and the County decided to wait until the expansion program is completed to obtain the operation permit. Lake Padgett Lake Padgett (a/k/a, Land O'Lakes) Percolation Pond System is another of the County's percolation pond sites. Its design and permitted disposal capacity is 1.0 MGD. The initial construction permit application (#DC51-159899) for the facility was filed in 1989. The Department granted the County's application for Permit DC51- 159899 on 5/16/89. The permit issuance was preceded by an Intent to Issue dated 4/27/89 finding that the County had provided reasonable assurances that the facility could be constructed and operated in accordance with applicable rules and standards. Specific Condition 15 of Permit DC51-159899 addresses the drainage ditches. It requires that any discharge of water from the ditch system to receiving waters must comply with Section 403.086, Florida Statutes (Grizzle- Figg standards). The Lake Padgett Percolation Pond System was constructed and operated pursuant to Permit DC51-159899. The County obtained an operation permit (#DO51- 205681) for the system on 3/26/92. Specific Condition 20 of the operation permit addresses the relief drainage ditch system, and requires that any discharge of water from the ditch system to the receiving waters comply with Section 403.086. The facility has operated pursuant to Permit DO51-205681 since 3/26/92 to present. Off-site discharges from the relief drainage ditches at the Lake Padgett Percolation Pond System have not resulted in violations of Permit DC51- 159899 or Permit DC205681. Also, the Department has never instituted an enforcement or compliance action as a result of discharges from the drainage ditches to off-site receiving waters. Construction of Oakley Grove The County conducted a site specific hydrogeologic and soil survey and effluent disposal study for the Oakley Grove site in late 1988. The County's initial construction permit application (#DC51-159755) for Oakley Grove Percolation Pond System was filed with the Department in 1/89. The Department granted the County's application for Permit DC51- 159755 on 6/22/89. The design and permitted disposal capacity for Oakley Grove is .600 MGD. The Oakley Grove permit issuance was preceded by an Intent to Issue dated 6/2/89 finding that the County had provided reasonable assurance that the facility could be constructed and operated in accordance with applicable rules and standards. Permit DC51-159755 does not contain any special conditions addressing the drainage ditches. One reason for this is that the surface water management permit issued by the Southwest Florida Water Management District ("SWFWMD") for this site contains conditions requiring the County to monitor any off-site discharges from the drainage ditches and prohibiting any violation of surface water quality standards. Consequently, there was no need for the Department to impose a similar permit condition. Oakley Grove Percolation Pond System was constructed under Permit DC51-159755. It was completed in 4/91 and has operated under that permit until approximately November, 1993. Oakley Grove Percolation Pond System's actual disposal rate during the period of operation has been about .200 MGD. The "Detrimental Reliance." The County paid $1,200,000 to acquire the Oakley Grove site. The County declined to purchase other potential sites that also would have cost about $1,200,000 in 1988, but would have cost about $1,800,000 in 1993. Total costs for property acquisition, engineering and construction at Oakley Grove have been approximately $2,800,000. In addition, the Shady Hills, Lake Padgett, and Handcart Road Percolation Pond Systems were constructed or modified at a cost of about $2,600,000 after issuance of the construction permit for the Oakley Grove project. To the extent that the County is unable to use the .600 MGD design disposal capacity at Oakley Grove, and cannot replace the deficit, the County will have insufficient disposal capacity. It would cost the County over $500,000 to modify the Oakley Grove site so that it could make some other practicable use of the property, and it would take about 18 months and about $2,800,000 to construct and place into operation a replacement disposal facility. During the time it would take to construct and place into operation a replacement disposal facility for Oakley Grove Percolation Pond System, the County would have inadequate wet weather disposal capacity unless it can replace the deficit. The County began planning a percolation pond system for the Moon Lake Road site in 1988, and paid $600,000 to acquire the site. The County does not own any of the potential effluent disposal sites that it passed over when acquiring the Moon Lake Road site. It would have cost about $660,000 to acquire a similar site in 1993. If the County is not permitted to construct the Moon Lake Road site, it cannot make any practicable use of that site. It would take about 18 months and about $500,000 to construct and place into operation a replacement wastewater effluent disposal facility for the Moon Lake Road site. During that time, the County would have inadequate wet weather disposal capacity unless it can replace the deficit. Alleged Default Permit for Moon Lake Road. Upon receipt of the application for Permit DC51-189086, the Department sent the County a letter dated 12/12/90 requesting additional information. The 12/12/90 request for additional information cited some specific rules although not for each item of additional information sought. The County's consulting engineer responded, on behalf of the County, to the request for additional information by letter to the Department's Permitting Engineer, dated 2/28/91. The County response stated that the County disagreed with the Department's "judgment" that the County's application was incomplete. But it also stated in pertinent part: However, recognizing that responsible professionals disagree and the extent to which you are responsible for rejecting this work, we have attached appropriate information and clarifying responses to aid you in discharging your professional duty. . . . Assuming we receive authorization from our client and that you accept full professional responsibility for the decision we will consider modifying our documents accordingly. In any event we feel comfortable requesting that you consider our permit application complete. On 3/26/91, the Department requested additional information. Again, the request cited some specific rules although not for each item of additional information sought. The County never responded. Meanwhile, the parties began to discuss settlement. Finally, on 2/13/92, the Department issued its notice of intent to deny the application. Subject Matter Index of Agency Orders. The Department has no subject matter index of any of its orders taking action on permit applications between 1975 and 1981. After 1981, the Department has had a subject matter index of its orders taking action on permit applications rendered in cases where there has been a request to initiate formal or informal administrative proceedings. There never has been a subject matter index of Department orders taking action on permit applications rendered in cases where there has not been a request to initiate formal or informal administrative proceedings. It would be impracticable, if not impossible, for the County to research such orders without a subject matter index. There is no central repository or computer database for all Department permit decisions. Some of its permitting files are located in its main Tallahassee office but many also are located in its seven district offices. Regardless of whether there is a central repository or computer database for orders taking action on permit applications rendered in cases where there has been a request to initiate formal or informal administrative proceedings, there is no evidence that, after 1981, there have been any such orders reflecting the Department's actual permitting practice with respect to percolation pond systems with drainage ditches. It was not proven that the County was unable, by reason of permitting files being located in both the main Tallahassee office and the various district offices, to research the Department's actual permitting practice with respect to percolation pond systems with drainage ditches. Research at the seven district offices would have been more costly than if all files were centrally located, but there is no reason in this case to believe that the additional cost would have been prohibitive. Alleged Biased Review. David Rhodes is an unlicensed environmental specialist employed by the Department's Southwest District Office. His responsibilities mainly consist of reviewing geotechnical and hydrogeologic information submitted in support of permit applications. He was the Department's primary reviewer for geotechnical and hydrogeologic information submitted in support of the County's applications for Permit DO51-194674 (Oakley Grove) and Permit DC51-189086 (Moon Lake Road), as well as Permit DC51-169994 (Handcart Road Percolation Pond System). He recommended denial of all three permit applications. On 2/18/91, David Rhodes contacted a County employee, Marshall Hughes, concerning the County's construction permit application for the Handcart Road Percolation Pond System and suggested "off-the-record" that the County discharge its geotechnical consultant, Richard Mortensen, and replace the proposed percolation pond system with a sprayfield. The County declined to terminate Mortensen. When Mortensen learned of David Rhodes's attempt to have the County fire him, Mortensen contacted David Rhodes's supervisor, Judith Richtar, on 3/4/91 to discuss this incident. Richtar told Mortensen that she was unaware of the matter, but would look into it and get back in touch with him. When Mortensen did not hear from Richtar for two weeks, he called her. She told him that David Rhodes had denied everything. Mortensen later learned that David Rhodes made comments and insinuations to two of his other clients disparaging his work performance and suggesting that his engineering firm was not competent. Mortensen was not satisfied with Richtar's handling of his complaint. On 4/25/94, he contacted Richtar's superior, Dr. Richard Garrity. Garrity asked for a letter detailing the incident. Mortensen wrote Garrity a letter dated 5/29/91 describing David Rhodes's communication with Hughes and requesting that Richtar be disciplined for her handling of this situation. David Rhodes was suspended by the Department without pay; however, Richtar was not disciplined. David Rhodes also wrote Mortensen a letter of apology for his communication with Marshall Hughes. The letter states his comments to Hughes should not be interpreted as a personal vendetta against Mortensen's engineering firm and that he hoped the incident could be put behind them so they could continue working on future projects. Rhodes admitted that he felt embarrassed after Garrity suspended him without pay and suggested that he write a letter of apology to Mortensen. About 3 months after David Rhodes's letter of apology, another Department employee, Joe May, filed 5 complaints with DBPR against Mortensen's P.E. license. The complaints identified the Handcart Road, Moon Lake Road, Oakley Grove, Lake Padgett and Westchase projects. (All of these are County projects, except for Westchase.) The complaints identified Richtar as a "contact person." Richtar knew about May's complaints before they were filed with DBPR and acquiesced to being identified in them as a contact person. Like David Rhodes, May is an unlicensed environmental specialist employed in the technical support section of the Department's Southwest District Office in Tampa. His responsibilities include reviewing geotechnical and hydrogeologic information submitted in support of permit applications. However, he had no permit review involvement with respect to the Oakley Grove, Moon Lake Road, Handcart Road and Lake Padgett projects. Instead, the hydrogeological aspects of those projects were assigned to May's colleague, David Rhodes. Mortensen's attorney responded to May's 5 complaints in January, 1992. Copies of Mortensen's technical reports were attached to the response, including the site specific studies he had prepared for the Oakley Grove and Moon Lake Road sites. DBPR referred May's complaints and Mortensen's technical reports to an independent engineering firm, Geotechnical and Environmental Consultants, Inc. for review. This firm prepared a report on January 21, 1993. The report exonerated Mortensen and found that May's complaints were without merit. DBPR took May's 5 complaints before a probable cause panel of the Board of Professional Engineers. The panel found there was no probable cause to pursue them. Mortensen was informed of this finding by DBPR's 8/31/93 letter. The Department has allowed David Rhodes to remain on the permit review team on the County's permit applications for the Oakley Grove and Moon Lake Road Percolation Pond Systems despite the fact Mortensen is the geotechnical consultant on these projects. It is not found that the continued presence of Rhodes and Richtar on the permit review team for the County's permit applications demonstrates the Department's prejudice against the County and its consultants. It is not found that the Department's decisions to deny the County's permit applications in this case were interposed for an improper purpose or that the denials were based on the permit reviewers' personal animosity against the County and its consultants, rather than on the merits of the facilities. However, relieving Rhodes and Richtar of their responsibilities with respect to these projects, if feasible, would have served to remove any appearance of bias and impropriety and also might have facilitated the resolution of these applications through more open and effective communication and cooperation.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Protection enter a final order as follows: In Case No. 92-1604: Denying the County's amended application for a permit (application no. DC51-189086) to construct a sprayfield reuse disposal system at .215 MGD and a rapid rate infiltration basin reuse (percolation pond) disposal system at .185 MGD at Moon Lake Road, subject to reconsideration after completion and review of a fracture trace analysis, a ground penetrating radar analysis (if needed), and an appropriate WQBEL study. If the application subsequently is granted, including among the specific conditions (1) a requirement for systematic load testing and monitoring of ground and surface water quality under the construction permit, as a condition for issuance of an operation permit, and (2), if appropriate, requiring monitoring, reporting and safely repairing subsidences, collapse features and sinkholes in and around discharge points. See, e.g., Specific Condition 12, Hudson WWTP Permit DC51-130307 (County Ex. 170). Case No. 92-1653: Denying the County's amended application for a permit (application no. DO51-194674) to operate its Oakley Grove rapid rate infiltration basin reuse (percolation pond) disposal system at 0.600 MGD, subject to reconsideration after completion and review of: (1) additional systematic load testing, (2) systematic monitoring of ground and surface water quality, and (3) an appropriate WQBEL study. Granting the County a permit (application no. DO51-194674) to operate its Oakley Grove rapid rate infiltration basin reuse (percolation pond) disposal system at 0.075 MGD, thereby supporting the operation of its Wesley Chapel Wastewater Treatment Plant to the extent of .075 MGD pending load testing, systematic monitoring and load testing and reconsideration of the application for an operation permit for more capacity, up to .600 MGD. Denying the County's amended application for a permit (application no. DO51-194674) to operate its Wesley Chapel Wastewater Treatment Plant at .600 MGD and limiting its capacity to the available permitted disposal capacity. Case No. 92-1654: Denying, as moot, the County's application for a permit (application no. DO51-199516) to reactivate the operation of its Ryals Road rapid rate infiltration basin reuse (percolation pond) disposal system at .1075 MGD. RECOMMENDED this 31st day of October, 1994, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of October, 1994. APPENDIX TO RECOMMENDED ORDER To comply with the requirements of Section 120.59(2), Fla. Stat. (1993), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. 1.-3. Accepted but subordinate and unnecessary. Accepted and incorporated. Speculative and unnecessary. 6.-12. Accepted and incorporated to the extent not subordinate or unnecessary. 13. Accepted but subordinate and unnecessary. 14.-30. Accepted and incorporated to the extent not subordinate or unnecessary. 31.-34. Accepted but subordinate and unnecessary. 35.-43. Accepted but largely subordinate and unnecessary. Incorporated to the extent not subordinate or unnecessary. 44. Last sentence, rejected as not proven that the DBPR consultant found the investigation and analysis to be "in accordance with sound engineering principles." Rest, accepted and incorporated to the extent not subordinate or unnecessary. 45.-53. Accepted and incorporated to the extent not subordinate or unnecessary. 54. Accepted and incorporated to the extent not subordinate or unnecessary. However, additional testing and evaluation should have been done. 55.-58. Accepted but largely subordinate and unnecessary. Incorporated to the extent not subordinate or unnecessary. 59. Rejected as not proven. 60.-61. Accepted but subordinate and unnecessary. 62. Last sentence, rejected as not proven that the DBPR consultant found the investigation and analysis to be "in accordance with sound engineering principles." Rest, accepted and incorporated to the extent not subordinate or unnecessary. However, additional testing and evaluation of soil permeability should have been done. 63.-76. Accepted but largely subordinate and unnecessary. Incorporated to the extent not subordinate or unnecessary. ("Southwest" in 76. should be "Southeast.") 77.-79. Accepted but subordinate and unnecessary. 80.-92. Accepted and incorporated to the extent not subordinate or unnecessary. Second sentence, rejected as not proven. Rest, accepted and incorporated to the extent not subordinate or unnecessary. Accepted but subordinate and unnecessary. 95.-113. Accepted and incorporated to the extent not subordinate or unnecessary. Conclusions of law. First sentence, accepted but subordinate and unnecessary; second sentence, conclusion of law. Conclusions of law. 117.-122. Accepted but generally subordinate and unnecessary. (There is no indication in this case that the Wesley Chapel WWTP cannot operate as designed, as permitted for construction, and as constructed, subject to available disposal capacity.) 123.-148. Accepted but subordinate and unnecessary. As to (c) and (d), rejected as not proven (Oakley Grove, without WQBEL studies, and Ryals Road without further investigation into significance of down-warping.) Otherwise, accepted: as to Ryals Road, moot, subordinate and unnecessary; as to Oakley Grove, incorporated to the extent not subordinate or unnecessary. As to (c) and (d), rejected as not proven without WQBEL studies and fracture trace analysis and, if then indicated, GPR. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated. Accepted but subordinate and unnecessary. Accepted and incorporated. 154.-155. Accepted but subordinate and unnecessary. 156.-158. Accepted and incorporated to the extent not subordinate or unnecessary. 159. Rejected as not proven that the use of the label "perimeter ditches" is "not accurate" or that the County used the term only because the Department did. Rather, both the Department and the County knew what was meant by "perimeter ditches" or similar terms, and the County only stopped using those terms in furtherance of its legal arguments in this case. Otherwise, accepted and incorporated. 160.-161. Accepted and incorporated to the extent not subordinate or unnecessary. 162. Accepted in the sense that the collection of reclaimed water in the ditches was not the primary goal of the drainage system. However, it was recognized that the collection of some reclaimed water in the ditches, especially under some weather conditions, was a necessary result of the use of the drainage features to improve the performance of the percolation ponds. 163.-166. Accepted and incorporated. 167.-169. Rejected as not proven that the Department has "changed position" without promulgating any rule. The County's own permitting experience has shown that the Department has had concerns about the performance of percolation pond systems with perimeter drainage features. Those concerns have evolved over time. Before April, 1989, those concerns were given expression in special conditions in permits. In April, 1989, F.A.C. Rules 17-610.517(2) and 17-610.522 were promulgated. The evidence does not prove that, before 9/15/89, the Department would not ever consider water in drainage ditches 100 feet from percolation ponds to be "reclaimed water." Accepted but subordinate and unnecessary. Rejected as not proven that approval or denial would be "automatic." The question was whether WQBELs or Grizzle-Figg standards would be applied. Rejected as not proven that WQBELs or Grizzle-Figg standards would be applied even if no reclaimed water ever made it into the ditches. 173.-174. Accepted but unnecessary. (Current practice simply reflects the application of the current rules.) Rejected as not proven that the Department position had "completely changed," that the Department was "inalterably opposed to the ditches," or that the Department had before it the "reasonable assurances" provided at the other sites. Otherwise, accepted but subordinate and unnecessary. Accepted but subordinate and unnecessary. Again, rejected as not proven that WQBELs or Grizzle-Figg standards would be applied even if no reclaimed water ever made it into the ditches. Otherwise, accepted but subordinate and unnecessary. Accepted but subordinate and unnecessary. Rejected as not proven. Accepted but subordinate and unnecessary. Rejected as not proven; also, subordinate and unnecessary. Accepted but subordinate and unnecessary. Rejected as not proven. Rejected as not proven that the Department stipulated that F.A.C. Rule 17-610.517(2) does not apply. Also, conclusion of law. Accepted but subordinate and unnecessary. 186.-187. The implication that the Department does anything other than follow F.A.C. Rule 17-610.521 is rejected as not proven and as conclusion of law. 188.-190. Rejected as not proven that reclaimed water infiltrating ditches at Oakley Grove and Moon Lake Road has been or will be "virtually indistinguishable" from other ground water. Otherwise, generally, accepted, and 100 feet should be enough in most circumstances. But the facts of individual cases must be considered to determine whether treatment afforded by 100 feet makes reclaimed water "virtually indistinguishable" from other ground water so as to no longer be considered reclaimed water. Also, the concentration of discharges via a ditch system is another factor to be considered. 191.-192. Accepted and incorporated. 193.-194. Rejected as not proven that they could be modified "easily" or without decreasing the permittable disposal capacity. Accepted (assuming they are built as designed) and incorporated. Last word should be "dry"; otherwise, accepted and incorporated. Accepted and incorporated. 198.-201. Rejected in part as being subordinate to facts not proven and contrary to those found. (Cady's testimony explained some of the wet ditch bottoms, but not all of them, and not the wet slopes of the berms.) Other parts, accepted and subordinate to facts found. 202.-206. Generally accepted and incorporated to the extent not subordinate or unnecessary. (However, the approach makes certain assumptions, and the estimates or predictions will not be accurate if the assumptions are not. In the case of Oakley Grove, the assumptions concerning hydraulic capacity do not appear to have been accurate.) 207.-211. Rejected as not proven. See 202.-206., above. 212. Accepted and incorporated. 213.-219. Accepted and incorporated to the extent not subordinate or unnecessary. But see 202.-206., above. 220.-226. Rejected as not proven as to Oakley Grove. See 202.-206., above. Accepted as to Moon Lake Road. Accepted as predictions based on the given assumptions, particularly as to hydraulic capacity of the site. 227.-230. Recitation of the experts' opinions, accepted as accurate recitations. Rejected that plant-life utilization of inorganic nitrogen allays Fricano's concerns. To the exact contrary, his concern is that plant-life will utilize the inorganic nitrogen in ways organic nitrogen would not be used, leading to undesirable environmental impacts. Also, rejected as not proven, without required WQBEL studies, that there will be no adverse environmental impact in downstream receiving waters. 231.-232. Accepted and incorporated. 233.-234. Rejected as not proven. (The County expert's opinion assumed only wet weather discharges. Also, not proven, without required WQBEL studies, that there will be no adverse environmental impact in downstream receiving waters.) 235.-239. Accepted and incorporated to the extent not subordinate or unnecessary. 240.-243. Accepted but subordinate and unnecessary. 244. Accepted and incorporated to the extent not subordinate or unnecessary. 245.-248. Accepted but subordinate and unnecessary. 249. Rejected as not proven that this can be done "easily." See 193.- 194., above. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 250.-251. Rejected as not proven. 252.-253. For both: last two sentences, rejected as not proven; the rest, accepted but subordinate and unnecessary. (F.A.C. Rule Chapter 17-600 forms did not apply.) Second and fourth sentences, rejected as not proven. The rest is accepted but subordinate and unnecessary. Accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven. 257.-258. Accepted but subordinate and unnecessary. 259. Rejected as to the location of some ditches within 100 feet of the percolation ponds. Otherwise, accepted but subordinate and unnecessary. 260.-261. Accepted but subordinate and unnecessary. 262. Rejected as not proven. 263.-269. Accepted but subordinate and unnecessary. 270. Rejected as not proven. 271.-279. Accepted but subordinate and unnecessary. Rejected as not proven. Accepted and incorporated to the extent not subordinate or unnecessary. (The "change in policy" is reflected in F.A.C. Rules 17-610.517(2) and 17-610.522.) Accepted and incorporated. As to (b) and (c), rejected as not proven without WQBEL studies. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated. As to (c), rejected as not proven. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated. 287.-289. Rejected as not proven and as conclusion of law. 290. Accepted and incorporated. 291.-293. Accepted and incorporated to the extent not subordinate or unnecessary. 294.-295. Conclusions of law. Accepted but subordinate and unnecessary. Rejected as not proven and as conclusion of law. Accepted but subordinate and unnecessary. 299.-301. Accepted and incorporated. 302. Accepted but subordinate and unnecessary. 303.-308. Rejected as not proven without WQBEL studies. Rejected as not proven. Rejected as not proven. (The SWIM plans were not in evidence, and it is not clear whether they incorporate by reference the permitting requirements at issue in these proceedings.) 311.-312. Accepted but subordinate and unnecessary. Rejected as not proven. Accepted but subordinate and unnecessary. Rejected as not proven without WQBEL studies. 316.-317. As to (g) and (h), rejected as not proven without WQBEL studies. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 318.-323. Rejected as not proven without WQBEL studies. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 324. Conclusion of law. 325.-326. Rejected as not proven. Accepted but subordinate and unnecessary. Rejected as not proven. (He disagreed with some of their opinions and the bases of some of the opinions.) First sentence, rejected as not proven; rest, accepted but subordinate and unnecessary. 330.-331. Subordinate and unnecessary. See 353. 332. Rejected as not proven. 333.-334. Subordinate and unnecessary. See 353. 335. Last sentence of 335., rejected as not proven; otherwise, accepted. 336.-350. Subordinate and unnecessary. See 353. 351. Last sentence, rejected as not proven that the DBPR consultant found the investigation and analysis to be "in accordance with sound engineering principles." Rest, accepted and incorporated to the extent not subordinate or unnecessary. 352.-353. Subordinate and unnecessary. See 353. Rejected as not proven that Oakley Grove has operated as predicted by the modeling. Otherwise, accepted but subordinate and unnecessary. Accepted but subordinate and unnecessary. Rejected as not proven that Oakley Grove has operated as predicted by the modeling. Otherwise, accepted but subordinate and unnecessary. Accepted but subordinate and unnecessary. Conclusion of law. Accepted and incorporated. Accepted but subordinate and unnecessary. 361.-362. Rejected that it was an offer to settle this case. Otherwise, accepted but subordinate and unnecessary. 363.-367. Accepted but subordinate and unnecessary. 368.-371. Accepted and incorporated. 372.-401. Accepted but subordinate and unnecessary. 402. Rejected as not proven. (They result from a combination of the nitrates in the reclaimed water and nitrates imbedded in the soil matrix from prior agricultural use. Also, unlike the Oakley Grove site, nitrate exceedances were observed at Wildcat Grove before application of any reclaimed water.) 403.-405. Accepted and incorporated to the extent not subordinate or unnecessary. 406. Rejected as not proven that reclaimed water was being applied at the time. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 407. Rejected as not proven when nitrate exceedances will end. Otherwise, accepted and incorporated. 408. Rejected as not proven. See 406., above. 409. Rejected as not proven. See 407., above. 410.-416. Accepted but subordinate and unnecessary. 417. Accepted but subordinate and unnecessary. 418.-421. Rejected as not proven. 422. Accepted but unnecessary. 423. Rejected as not proven that their concerns are "unfounded" unless the source of reclaimed water is restricted to Deer Park WWTP. Otherwise, accepted but unnecessary. 424. Assuming performance in accordance with the application, accepted but unnecessary. 425.-430. Accepted and incorporated to the extent not subordinate or unnecessary. 431. First sentence, accepted and incorporated to the extent not subordinate and unnecessary; second sentence, rejected as not proven. 432.-445. Accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven. Rejected as not proven without WQBEL studies. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven. (Without the fracture trace analysis and, if then indicated, the GPR requested by the Department.) Accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven. (Without the fracture trace analysis and, if then indicated, the GPR requested by the Department.) Accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven. (Without the fracture trace analysis and, if then indicated, the GPR requested by the Department.) First sentence, rejected as not proven; second sentence, conclusion of law. Rejected as not proven without WQBEL studies. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated. 457.-465. Accepted and incorporated to the extent not subordinate or unnecessary. 466.-470. Rejected as not proven without WQBEL studies. 471. Last sentence, accepted and incorporated; rest, rejected as not proven without WQBEL studies. 472. Rejected as not proven. See 310., above. 473.-475. Accepted but subordinate and unnecessary. 476. Rejected as not proven. 477.-478. Accepted but subordinate and unnecessary. Rejected as not proven (that the discharges are.) As to (d), rejected as not proven without WQBEL studies. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven without WQBEL studies. Accepted but subordinate and unnecessary. Rejected as not proven and as conclusion of law. 484.-485. Rejected as not proven. Accepted but subordinate and unnecessary. Rejected as not proven. (He disagreed with some of their opinions and the bases of some of the opinions.) Ultimate and penultimate sentences, rejected as not proven. The rest is accepted (although the fourth sentence is not complete) and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated. First sentence, accepted and incorporated; rest, rejected as not proven. 491.-493. Accepted and incorporated to the extent not subordinate or unnecessary. 494. Accepted and incorporated to the extent not subordinate or unnecessary. 495. First sentence, accepted and incorporated to the extent not subordinate or unnecessary; second sentence, rejected as not proven. 496.-499. Accepted and incorporated to the extent not subordinate or unnecessary. 500. Last sentence, rejected as not proven; rest, accepted and incorporated to the extent not subordinate or unnecessary. 501. Accepted but largely subordinate and unnecessary. (Also, Saddlebrook was permitted under different rules; now, the special conditions can only be established after WQBEL studies.) 502.-504. Accepted and incorporated to the extent not subordinate or unnecessary. (However, it is understood that the constant head cell approach proved acceptable for purposes of estimating hydraulic capacity of the site but that it still did not accurately portray what would happen in the ditches and adjacent wetlands.) 505.-509. Accepted and incorporated to the extent not subordinate or unnecessary. 510. Rejected as not proven that the criticism was immaterial. See 502.- 504., above. 511. Last sentence, rejected as not proven that the DBPR consultant found the investigation and analysis to be "in accordance with sound engineering principles." Rest, accepted and incorporated to the extent not subordinate or unnecessary. 512.-524. Accepted and incorporated to the extent not subordinate or unnecessary. 525. Rejected as not proven that it would without fracture trace analysis and, if then indicated, the GPR. (Accepted that it might.) 526. Rejected as not proven that he was directed to "speak in favor of the County's permit application." 527. Accepted and incorporated to the extent not subordinate or unnecessary. 528. Except that 500 feet is a minimum setback distance, accepted and incorporated to the extent not subordinate or unnecessary. 529.-530. Accepted and incorporated to the extent not subordinate or unnecessary. 531. Rejected as not proven without fracture trace analysis and, if then indicated, the GPR. See 525., above. 532.-534. Accepted and incorporated to the extent not subordinate or unnecessary or conclusion of law. 535. Accepted but subordinate and unnecessary. 536.-537. Rejected as not proven without WQBEL study. 538.-543. Accepted and incorporated to the extent not subordinate or unnecessary. 544. Rejected as not proven. (Rather, the County stated that it wanted its request for minor berm restoration work to be treated as exempt activity under F.A.C. Rule 17-4.040(1)(a) and that it wanted the installation of new groundwater monitoring wells to be handled under Ground Water Monitoring Plan Condition 3 of Permit DO51-142683 (the Oaks Royal/Ryals Road operation permit).) 545.-546. Rejected as not proven. Also, moot, subordinate and unnecessary. 547.-552. Accepted and incorporated to the extent not subordinate or unnecessary. 553.-557. Accepted but moot and unnecessary. Rejected as not proven. Also, moot and unnecessary. Accepted but moot and unnecessary. Rejected as not proven (due to possible subsidence features.) Also, moot and unnecessary. Accepted but moot and unnecessary. Rejected as not proven (due to possible subsidence features.) Also, moot and unnecessary. 563.-566. Accepted but moot, subordinate and unnecessary. 567. Subordinate to facts not proven. 568. First sentence, rejected as not proven. Also, rejected as not proven that the Ryals Road sinkhole was "small." Otherwise, accepted. All moot and unnecessary. 569. Rejected as subordinate to facts not proven. 570. Last sentence, rejected as not proven. Otherwise, accepted. All moot, subordinate and unnecessary. 571.-573. Accepted but moot, subordinate and unnecessary. Last sentence and word "stable," rejected as not proven. (He stated that the clay was "competent" and that the GPR could detect sinkholes down to 20 feet, but he did not comment specifically on the significance of the down- warping across the site and in the southeast corner.) Otherwise, accepted. All moot, subordinate and unnecessary. Accepted but moot, subordinate and unnecessary. Rejected as not proven that it is "unknown." The evidence is not clear, but Richtar thought the sinkholes at Oaks Royal opened after construction. Otherwise, accepted but moot, subordinate and unnecessary. Accepted. Subordinate, in part to facts not proven and in part to facts supported by the greater weight of the evidence. Moot, subordinate and unnecessary. Except for characterization of sinkhole as being "small," accepted but moot, subordinate and unnecessary. Last sentence, rejected as not proven. (It is not a substitute for further investigation into the cause of the down-warping across the site and in the southeast corner.) Otherwise, accepted but moot, subordinate and unnecessary. Rejected as not proven. 581.-582. First sentence, accepted but subordinate and unnecessary. Second sentence, rejected as not proven and conclusion of law. 583. Second sentence, rejected as not proven. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 584. First and last sentences, rejected as not proven. Rest, accepted and incorporated to the extent not subordinate or unnecessary. 585. Accepted and incorporated to the extent not subordinate or unnecessary. 586. Accepted (assuming no new capacity) and incorporated to the extent not subordinate or unnecessary. 587.-588. Rejected as not proven. (It assumes no new capacity.) 589.-590. Accepted and incorporated to the extent not subordinate or unnecessary. 591. Rejected as not proven. 592.-593. Accepted and incorporated to the extent not subordinate or unnecessary. 594. Rejected as not proven. 595. Accepted but moot, subordinate and unnecessary. 596. Third sentence, not proven. Rest, accepted but moot, subordinate and unnecessary. 597.-599. Accepted but moot, subordinate and unnecessary. 600. Accepted (assuming no new capacity) but moot, subordinate and unnecessary. 601. Rejected as not proven. Also, moot, subordinate and unnecessary. 602. Accepted and incorporated to the extent not subordinate or unnecessary. 603.-604. Rejected as not proven. Rejected as not proven that he is "one of the most vocal opponents." Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven that Rhodes contacted Hughes or that it was Rhodes's primary purpose to suggest Mortensen's discharge. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted but subordinate and unnecessary. Rejected as not proven that Rhodes was attempting to have the County "fire" Mortensen. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Rejected as not proven that Rhodes suggested Mortensen was incompetent. (Mortensen alleges he made "comments and insinuations" that "basically suggested that MEI was incompetent.") Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 610.-620. Accepted and incorporated to the extent not subordinate or unnecessary. 621. Rejected as not proven that Rhodes was attempting to have the County "fire" Mortensen. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 622. Rejected as not proven that Rhodes and Richtar were attempting to have the County "fire" Mortensen. Also, rejected as not proven that the "Department" will not be "truly impartial." Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Relieving Rhodes and Richtar of their responsibilities with respect to these projects, if feasible, would have served to remove any appearance of bias and impropriety and also might have facilitated the resolution of these applications through more open and effective communication and cooperation. 623. Rejected as not proven. Also, subordinate and unnecessary. (The issue is whether they should be granted, not whether the reviewers should have recommended that they be granted.) Respondent's Proposed Findings of Fact. The Department's proposed findings of fact are numbered separately by facility: Oakley Grove Accepted and incorporated. "Rimmed" rejected as contrary to the greater weight of the evidence and facts found. Otherwise, accepted and incorporated. 3.-8. Accepted and incorporated to the extent not subordinate or unnecessary. Accepted but subordinate and unnecessary. (No "wastewater" would discharge from the ditch system.) Rejected as contrary to the greater weight of the evidence and facts found that this was "revealed" by staff inspections. (Under certain conditions, and at certain application rates, it was expected.) Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted. Subordinate to facts found. Rejected as contrary to the greater weight of the evidence and facts found. At the time of some if not all of the Department inspections, water was being diverted from some of the main stormwater collection ditches. 13.-18. Generally accepted and incorporated to the extent not subordinate or unnecessary. 19. "Wastewater effluent ponds" is inaccurate description. Otherwise, accepted and incorporated. 20.-24. Accepted and incorporated to the extent not conclusion of law. 25. Rejected as contrary to the greater weight of the evidence and facts found, and as conclusion of law, that it is "typical." (The proposed finding seems to be describing a Level II WQBEL study.) 26.-29. Accepted and incorporated to the extent not conclusion of law. (29. again seems to refer to a Level II WQBEL study.) 30. Accepted and incorporated to the extent not subordinate or unnecessary. 31.-36. Accepted. Largely subordinate to facts found. Accepted and incorporated to the extent not subordinate or unnecessary. Conclusion of law. Accepted and incorporated. 40.-42. Conclusion of law. Accepted and incorporated. If "different nitrogen" means other than inorganic, accepted but subordinate and unnecessary. Rejected as unclear what "distinguishes the type and amount of nitrogen" and what "numerous conditions" means. Accepted and incorporated to the extent not subordinate or unnecessary. 47.-49. Accepted and incorporated to the extent not conclusion of law. Accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated to the extent not conclusion of law. 52.-55. Accepted and incorporated to the extent not subordinate or unnecessary. 56. Accepted and incorporated to the extent not conclusion of law. 57.-58. Accepted and incorporated to the extent not conclusion of law. Rejected as conclusion of law and as not proven what is "typical." Accepted and subordinate to facts found. 61.-62. Accepted and incorporated to the extent not conclusion of law. 63.-82. Accepted and incorporated to the extent not subordinate or unnecessary or conclusion of law. 83.-102. Accepted and incorporated to the extent not subordinate or unnecessary. 103. Rejected as not clear from the evidence whether reclaimed water was being applied on those dates. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 104.-106. Accepted and incorporated to the extent not subordinate or unnecessary. 107.-110. Accepted but subordinate and unnecessary. (These violations were temporary aberrations in otherwise proper operation of the facility. They were corrected and do not bear significantly on the question whether the County has given reasonable assurances.) Last sentence, rejected as contrary to the greater weight of the evidence and facts found. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. Accepted and incorporated to the extent not subordinate or unnecessary. Accepted but subordinate and unnecessary. (The manual was maintained at a different location.) Moon Lake Road 1.-13. Accepted and incorporated to the extent not subordinate or unnecessary. 14. One was proposed in evidence presented at the hearing but not in the application. 15.-19. Accepted and incorporated to the extent not subordinate or unnecessary. 20.-24. Accepted and incorporated to the extent not conclusion of law. 25.-26. Conclusion of law. Accepted and incorporated to the extent not subordinate or unnecessary. "Any" is rejected as contrary to the greater weight of the evidence. Accepted and incorporated. 30.-32. Accepted. Subordinate to facts found. Accepted and incorporated to the extent not conclusion of law. First sentence, unclear; second sentence, accepted but subordinate and unnecessary. Accepted. Subordinate to facts found. 36.-38. Accepted and incorporated to the extent not conclusion of law. "Effluent" rejected to the extent that it infers something other than "reclaimed water." Rejected as to Deer Park WWTP; accepted as to the others. Accepted and incorporated. 41.-43. Accepted and incorporated to the extent not subordinate or unnecessary. 44.-49. Accepted and incorporated to the extent not subordinate or unnecessary. 50.-52. Rejected as contrary to the greater weight of the evidence and facts found that the rainfall/evapotranspiration differences are great enough to have a significant impact on site capacity. The Tampa Airport data was the best to use at the time of the application. Other, closer data became available later and were considered as part of the County's rebuttal case. 53. Rejected as contrary to the greater weight of the evidence and facts found that the design of the model (constant head cells, boundaries, and single- layer) has a impact on site's hydraulic capacity. (It is understood that the significance of the design of the model is that it does not show flow into the ditches and adjacent wetlands or the relationship between surficial and Floridan aquifers.) 54.-55. Accepted and incorporated to the extent not subordinate or unnecessary. 56. Rejected as contrary to the greater weight of the evidence and facts found. 57.-58. Accepted and incorporated to the extent not subordinate or unnecessary. See 53., above. Rejected as contrary to the greater weight of the evidence and facts found. Accepted but subordinate and unnecessary. 61.-63. Rejected as contrary to the greater weight of the evidence and facts found. 64.-65. Accepted but subordinate and unnecessary. 66. Rejected as contrary to the greater weight of the evidence and facts found. See 50.-52., above. Limiting storage needs to the .215 MGD design sprayfield capacity only, there is no real question as to the needed storage capacity. Neither differences in the rainfall/evapotranspiration data nor differences in the source of the reclaimed water would make storage capacity deficient. Ryals Road 1.-10. Accepted and incorporated to the extent not subordinate or unnecessary. Rejected as contrary to facts found and to the greater weight of the evidence that it was "effectively withdrawn." Otherwise, accepted and incorporated. Rejected as not supported by the evidence that a $400 fee was paid on July 12, 1991. Otherwise, accepted and incorporated to the extent not subordinate or unnecessary. 13.-14. Accepted and incorporated to the extent not subordinate or unnecessary. 15.-26. Accepted but moot, subordinate and unnecessary. 27. Rejected as contrary to the greater weight of the evidence. Also, moot, subordinate and unnecessary. 28.-33. Accepted but moot, subordinate and unnecessary. 34. Rejected as not supported by the evidence that the residential density is "high". Otherwise, accepted but moot, subordinate and unnecessary. COPIES FURNISHED: Edward P. de la Parte, Jr., Esquire David M. Caldevilla, Esquire de la Parte, Gilbert & Bales, P.A. P.O. Box 2350 Tampa, Florida 33601-2350 Douglas H. MacLaughlin, Esquire Francine M. Ffolkes, Esquire Keith C. Hetrick, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32399-2400 Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, Esquire General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
The Issue The issue is whether Respondent, Ben A. Leasure, should have a $3,000.00 administrative penalty imposed, take corrective action, and pay investigative costs for allegedly illegally filling 0.17 acres of wetlands contiguous with the Withlacoochee River (River), a Class III water, on land located in unincorporated Hernando County, Florida.
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Respondent is the owner of an approximate 5-acre parcel of land located at the intersection of Olivet Drive and State Road 50 (5345 Olivet Drive) in unincorporated Hernando County, Florida. The property is also known as Parcel Identification Number R09-123-21-1110-00J0-0010. In broader geographic terms, the property lies just east of Interstate 75, west of U.S. Highway 301, and just west-southwest of Ridge Manor, a small community in Hernando County. The western boundary of the parcel is approximately 500 feet east of the River, a Class III Outstanding Florida Waterbody (OWF), which meanders through the area. See Fla. Admin. Code R. 62- 302.700(9)(i)41. In November 1971, Respondent purchased his property and on a later undisclosed date built a residence. According to Department Exhibit 24, which is a letter authored by Respondent in 1987, he first began filling the floodplain on the western part of his land "probably" in 1971, or just after he purchased the property. Historical aerial photographs of the site indicate that sometime before 1984, he constructed a pond just north of his house, apparently to be used for fishing, and by 1992 he had constructed a second, smaller pond just south of the larger pond. On February 3, 1986, the United States Army Corps of Engineers (Corps) sent Respondent a Cease and Desist Order in the form of a letter in which it advised Respondent that he had placed a "considerable amount of fill material" in wetlands adjacent to the River; that such filling was in violation of the federal Clean Water Act of 1977; that legal action would be taken if further filling occurred; that he must reply within 15 days indicating that he had complied with the terms of the letter; and that within the same timeframe he must provide information concerning the public and/or private need for the work, the effects on the surrounding area, and any other relevant information. By letter dated March 12, 1986, Respondent responded to the Cease and Desist Order and stated that prior to 1977 the land had been changed from wetlands to usable farmland, that his land did not connect to the River, and that there were no natural waters on his property that connected to state or federal waters. A follow-up letter was sent by the Corps on February 26, 1987, in which the Corps advised Respondent that he could resolve the violation "by removing all unauthorized fill material" and restoring the area. He was also told that in lieu of doing this, he could file an application for an after- the-fact permit authorizing the filling. A copy of a Joint Application for Permit was attached to the letter. On March 7, 1987, Respondent replied to the Corps' letter and stated that his land did not connect with any other waterbody; that he had been filling his property since 1971 without objection by anyone; that he had a "hard time understanding all these rules and regulations"; and that he questioned why the Corps was causing him "so much trouble for the last couple of years." Respondent never filed an application for an after-the-fact permit nor did he receive a reply to his letter. After an "Unauthorized Wetland Alteration Field Investigation" was conducted by the Southwest Florida Water Management District (District) sometime in 1992, by letter dated November 3, 1992, the District advised Respondent that it appeared the "wetland in question was disturbed prior to October, 1984" and that any filling done before that date was exempt from its jurisdiction; that it appeared that other dredge/fill work had been performed on the same wetland since that date; that Respondent's claim that the area was being used for agricultural purposes was not supported by any evidence; that Respondent's activities constituted a violation of Chapter 373, Florida Statutes; and that all illegal activity must be ceased immediately. The disposition of further contacts between the District and Respondent, if any, are unknown. Against this backdrop, on August 16, 2002, the Department's Tampa District Office received a complaint from the District stating that Respondent had illegally filled wetlands on his property. (The record does not show why the District waited almost ten years to refer the complaint to the Department.) In response to that complaint, and as a precursor to issuing a formal notice of violation, on August 20, 2002, the Tampa district office sent Respondent a warning letter indicating that a violation "may exist on [his] property" and requesting that he contact the Department to arrange a meeting "to discuss this matter." By mutual agreement, an inspection of the property was scheduled for September 5, 2002. Because a Department representative became unavailable just before the inspection, the Department did not appear at the property on the scheduled date or notify Respondent that the inspection had been cancelled. The following day, September 6, 2002, Department personnel were in the area and appeared unannounced at Respondent's property. However, no one was home and they did not inspect the property. Several weeks later, Department personnel again visited the site but could not gain access. Because Respondent was unwilling to grant access to his property, on April 17, 2003, the Department obtained an inspection warrant from the Circuit Court in Hernando County authorizing an inspection of Respondent's property. On April 22, 2003, seven Department employees inspected the property. Based upon plant species and hydrological indicators found on the property, it was established that the northwestern corner of Respondent's property lay within the surface water floodplain of the River and constituted wetlands, as defined by Section 373.019(22), Florida Statutes, and Florida Administrative Code Rule 62-340.200(19). (The Department also established that there is a fifty percent chance of the filled area being flooded during any given year.) Therefore, any filling on that portion of Respondent's property would require a permit. Department records reflected that Respondent had never obtained a permit authorizing any work. During their inspection, Department representatives observed that a narrow strip of land totaling around 0.20 acres in the northwest corner of the parcel (just west of the larger fish pond) had been filled with concrete debris and sand to a height of around 6 or 7 feet in an effort to sever the connection between the River and the wetlands.5 Unless the berm is removed, the activity could lead to adverse cumulative impacts, including a loss in available habitat for floral and fauna that currently use the area, a loss in water storage capacity of the current system, and a loss in detritus formation and nutrient/pollution cycling. An Enforcement Inspection Report prepared after the inspection recommended that an enforcement action be initiated. On June 10, 2004, the Department issued its Notice alleging that Respondent had violated Florida Administrative Code Rule 62-343.050, which requires a permit to fill wetlands or surface waters, and Section 403.161(1)(b), Florida Statutes, which makes it unlawful to violate a Department rule. On August 12, 2004, Respondent filed his Petition challenging the Notice. In his Petition, Respondent denied that he owned the property on which the filling occurred; alleged that the property had been previously inspected in 1986 by the Corps; alleged that the District confirmed by letter in 1992 that the filling had occurred prior to 1984 and was therefore exempt from regulation; and alleged that he is entitled to "restitution" for damages caused by the Wysong Dam being rebuilt downstream from his property. At hearing, Respondent also suggested that the filled area was not wetlands. This proceeding followed. On November 17, 2004, the Department conducted a second inspection of Respondent's property. The objectives of that inspection were to determine the boundary of the filled area by Global Position Satellite equipment and to allow Eric D. Hickman, the new Environmental Manager who was not present during the first inspection, to perform a review of the property. Through ground reconnaissance and photo- interpretation, Mr. Hickman was able to establish the landward extent of the wetlands and other surface waters of the State. Based on vegetation, soils, and hydrologic indicators found on the site, he was able to confirm that the filled area on Respondent's property is wetlands. In fact, because of the overwhelming evidence of wetland indicators on the property (that is, the site conditions met nearly every single test criterion for a wetland), Mr. Hickman stated that he could make that determination with "100 percent certainty." Mr. Hickman concurred with the findings in the earlier inspection report, including one that the filled area is located entirely within a forested floodplain, which is both a surface water and a wetland due to regular flooding in the area for sustained periods of time. Photographs received in evidence, and testimony by Department representatives, confirm that the flooding occurs on a regular basis. See also Finding of Fact 13, supra. Significantly, Mr. Hickman observed that additional filling had occurred since the first inspection some eighteen months earlier, and that there were two signs on the front of his property reading "Needed Clean Fill." Finally, the location of two large cypress trees on the property suggested that an intact and mature floodplain existed before the alterations occurred. The filling poses a threat to the functions of the land, such as vegetation and habitat. Therefore, removal of the concrete debris and sand is necessary in order to restore those functions. While the Department would not promise that he could do so, it did represent that it would consider Respondent's request to remove the debris and sand to the upland area of his property, which would be much less expensive than hauling it offsite. At hearing, Respondent acknowledged that despite a warning by the Corps in 1986 that the filling was illegal, he has continued to engage in that activity for at least two reasons: to prevent flooding of his property and to prevent contaminated River water from reaching his fish ponds. He further acknowledged that as recently as 2003 he allowed several trucks to dump concrete debris and sand onto his property. (The concrete debris was obtained from a local Walmart store.) Respondent justified his actions in part on the ground that the Corps failed to respond to his letter in March 1987, and he assumed that this was an indication that the filling was legal. He also contended that the filled area was originally uplands when he purchased the property, but it changed to wetlands due to increased runoff from heavy development in the area and the construction of a dam downstream which caused the River to overflow during heavy rains. As a consequence, his property and others in the area (such as homes on Cyril Drive) have been prone to flooding. However, Mr. Hickman established that a floodplain existed on the property before any filling occurred. In any event, the Department has jurisdiction over both natural and artificial wetlands, and permits are needed for filling either type of wetland. Therefore, while the filling may have been performed for a salutary purpose, after 1984 he needed a permit to do so (assuming that such activities in a wetland are permittable). The fact that the land is zoned agricultural by Hernando County does not negate this requirement.5 Finally, a contention that a wetland is changed to uplands by merely placing dry dirt onto the wetland has been rejected. The land still remains a wetland for jurisdictional purposes. Respondent never filed for an after-the-fact permit (as suggested by the Corps in 1987) because it was too "complicated" to fill out the form. He conceded, however, that he did not ask the Department for assistance in doing so. Except for the explanations discussed above, Respondent presented no mitigating evidence. He has asked that due to his financial circumstances the amount of the fine be moderated or forgiven. At hearing, three Tampa District Office employees established that they spent a total of 70 hours of time on this case. At their hourly rate of pay, this totals $1,850.00 in investigative costs. In addition, Mr. Hickman was required to perform a wetland determination on the property. The normal charge for an assessment on a property of this size is $550.00. The reasonableness of these amounts was not disputed by Respondent. However, the Department is seeking reimbursement of only $500.00.
Conclusions On May 11, 2007, the Division of Administrative Hearings (‘DOAH’) submitted a _ Recommended Order (“RO”) to the Department of Environmental Protection (‘DEP’) i in . these consolidated proceedings. Copies of the RO were served upon the Petitioners, Mellita A. Lane, Jacqueline M. Lane, Peter A. Lane, (“Lane Petitioners”); Friends of Perdido Bay,.Inc., and James A. Lane (“FOPB”); and the Co-Respondent, International Paper Company (“IP” ). On May 29, 2007, all Petitioners and Respondent IP filed Exceptions to the RO. Respondent DEP filed Exceptions to the RO and Motion for Remand. ; On June 8, 2007, the FOPB filed a Reply to IP’s Exceptions and a Response to DEP’s Motion for Remand and Exceptions. The Lane Petitioners filed their Response to iP’s and DEP’s Exceptions. Respondent DEP filed Responses to the Exceptions filed . by the FOPB, the Lane Petitioners and IP. Respondent IP filed Responses to the Exceptions of FOPB, the Lane Petitioners and DEP. This matter is now before me for. final agency action. . _ BACKGROUND » Florida Pulp and Paper Company first began operating the Cantonment paper mill in. 1941. St. Regis Paper Company (St. Regis” ) acquired the mill in 1946. In 4984, Champion International Corporation (“Champion”) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such a as printing and writing grades c of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to | be printing and writing paper. ' The mill s wastewater effluent i is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is . sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class I water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama, on the west. The dividing line between ‘the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 98 crosses the Bay, going east and west, and forms the boundary between what is-often referred to as the “Upper Bay” and “Lower Bay.” The Bay is relatively shallow, especially | in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay i is designated asa Class ill water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. Itis primarily a freshwater river but itis sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (“OFW’) in 11979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, isa large tract of land owned by IP called the Rainwater Tract, The northern part of the tract is primarily freshwater wetlands. The southern partis a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. | ' Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (‘DER’) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The United States Environmental Protection Agency ("EPA") issued St. Regis a National Pollutant Discharge Elimination System (“ NPDES") permit i in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its wastewater treatment plant (‘WWTP’) in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production - process. In 1987, Champion applied to DER for an operating permit-for its modified WWITP and also petitioned for a variance from the Class iI water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's . subsequent proposal to issue the operating permit and variance was formally challenged. In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for the operating permit and requested a . temporary operating permit ("TOP"), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 (‘the 1989 Consent Order’). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violations of state water quality standards in Elevenmile Creek for dissolved oxygen (“DO”), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommend measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed bya series of related scientific studies, which are referred to collectively in the RO as “the Livingston studies.” The 1989 Consent Order had no expiration date, but it was tied to the TOP, , which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The mill was not in compliance with all water quality standards in December 1 994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. instead, the Department agreed through correspondence with . Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. - In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1 995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal ‘operating permits into a single permit identified as Wastewater Permit Number FLO002526-002-IWF/MT. During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmiie Creek or the Escambia River. . In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WwTP upgrades consist of converting toa. modified activated sludge treatment process, incteasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (‘MGD’). IP proposes to convey the treated effluent by-pipeline 10.7 miles to the 1,464-acre wetland tract owned by IP (contained within-the larger Rainwater Tract), where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and Upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to: reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department published notice of its intent fo issue a proposed permit, consent order, experimental wetland exemption, and waiver. The — Department authorizations would allow IP to change its industrial wastewater treatment system at the mill, construct an effluent distribution system within the wetland tract, construct the 10.7-mile pipeline to transport its treated wastewater to the wetlands, and discharge the treated wastewater into the wetlands. In April 2005, Mellita A. Lane, Jacqueline M. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane (“Lane Petitioners”) filed identical petitions challenging the Department authorizations on numerous grounds. The Department forwarded the petitions to DOAH for assignment of an Administrative Law Judge (“ALJ”) and to conduct an evidentiary hearing. The Lane Petitioners subsequently amended their petitions. In May 2005, Friends of Perdido Bay, Inc., and James Lane filed a petition for | hearing to challenge the Department authorizations. The FOPB petition was forwarded to DOAH and the pending cases were consolidated for the fi nal hearing. The FOPB petition was subsequently amended. In October 2005, while the cases were pending, IP applied for a revision to its NPDES permit renewal application. The cases were abated so that the DEP could review and act on the permit revision. In January 2006, DEP issued a proposed revised | NPDES permit and a corresponding First Amendment to Consent Order. On July 26, 2006, the Department filed without objection a revision to the Consent Order. On July 31, 2006, the Department filed Joint Trial Exhibit 18 that integrated the Consent Order dated April 12, 2005, the First Amendment to Consent Order dated January 11, 2006, and the Department’s Notice of Minor Revision {o Consent Order filed on July 26, 2006. The DOAH Administrative Law Judge CALL") held a lengthy final hearing in these consolidated cases on May 31, June 1, 2, and.26 through 30, and July 17, 27, and 28, 2006. Prior to the hearing, the parties filed their Joint Pre-Hearing sit on May 24, 2006. The ALJ subsequenty submitted his RO on May 11, 2007. -