Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
PHILLIP G. PANOS vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-000479 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 25, 1990 Number: 90-000479 Latest Update: Dec. 11, 1990

Findings Of Fact The Petitioner, Phillip G. Panos, recently moved from Michigan to Florida and is now a Florida resident. On December 9, 1989, prior to moving to Florida, he applied to the Respondent, Department of Environmental Regulation for certification as a Class C domestic waste water treatment plant operator. The Respondent is an agency of the State of Florida charged, among other duties, with regulating the certification, the practice standards and the educational standards of Class C domestic waste water treatment plant operators. The Respondent agency reviewed the Petitioner's application and denied it for failure to demonstrate the requisite three years of experience required by the rule cited below. From April, 1974 to June, 1990 the Petitioner was employed at the Chapaton Pumping Station in St. Clair Shores, Macomb, Michigan. The Chapaton Pumping Station duties involved the Petitioner monitoring the distribution of sewage flows, collecting sludge samples, chlorinating the effluent and pumping it into Lake St. Clair. When the Petitioner left the Chapaton Pumping Station, in June of 1990, he held the position of Senior Station Operator II. The Chapaton Pumping Station receives a combination of storm water flow and sanitary sewage flows. It is a pumping and storm water retention facility for combined sewage. The facility provides primary treatment and disinfection for this combined sewage effluent. The effluent is chlorinated and then pumped to nearby Lake St. Clair while the solids that have settled out of the effluent are retained, collected and sent to the Detroit waste water treatment facility for advanced waste treatment. Chapaton is classified by the state of Michigan's Department of Natural Resources as an "industrial/commercial facility". The industrial classification was originated by the U.S. Environmental Protection Agency (EPA) and has been adopted as a designation or classification by both Michigan and Florida. The Petitioner holds an industrial/commercial waste water treatment certification from the state of Michigan in the category of "plain clarification and disinfection." The Petitioner's experience in Michigan is in the area of industrial waste water treatment and does not constitute actual experience in on-site operational control of a domestic waste water treatment plant (that is a sewage treatment plant). The Petitioner's experience in Michigan does not qualify as industrial waste water treatment plant experience, that could be used to meet the actual experience requirement, because the Chapaton plant performs only primary treatment and disinfection. Secondary or advanced waste treatment is performed at the Detroit waste water treatment plant, with which the Petitioner has no experience. In a typical domestic waste water treatment plant in Florida, "primary treatment" involves primary clarification or settling. Primary clarification occurs in a circular or rectangular tank where soluble solids settle out to the bottom of the tank and floating solids are removed by a skimming device. The soluble solids are called sludge. Primary clarification can remove 40% of BOD and suspended solids. It is not a form of advanced treatment or even secondary treatment. At the Chapaton plant, during primary treatment, a minimum of 70% BOD and suspended solids are removed. The sludge is not treated at the Chapaton plant but is pumped to the Detroit waste water treatment plant. Thus Chapaton could not be classified as a domestic waste water treatment plant by Florida standards, since it only provides primary clarification and no secondary or advanced waste water treatment. Secondary treatment consists of two types. Activated sludge or trickling filter treatment. Both types deal with oxygen being introduced to the sludge to achieve stabilization and more settling out of the sludge elements. Since June 18, 1990 the Petitioner has been employed as a waste water treatment plant operator I in a training program at the George L. Lohmeyer Waste water Treatment Plant in Ft. Lauderdale, Florida. In that training program the Petitioner is being trained in all phases of operation of the Lohmeyer plant. It is a 34-million-gallon-per-day (MGD) activated sludge treatment plant. In his duties, the Petitioner monitors the plant treatment processes, takes samples and submits them to the city's laboratory. The Petitioner is capable of testing the samples himself for dissolved oxygen, chlorine and ph. Reports are signed by the regional chief or the regional facilities manager. The Petitioner's present position qualifies as actual, appropriate experience in the operational control of a waste water treatment plant. The Petitioner has accumulated approximately 3-1/2 months of the 12 months of actual experience required for certification as a Class C waste water treatment plant operator, through the exercise of his duties at the Lohmeyer plant. The Petitioner must accumulate 12 months or 2,080 hours of actual experience before he can qualify for the Class C certification. The Petitioner is a high school graduate and has successfully completed Volumes I and II of the California State University correspondence course in waste water treatment, which is included on the Respondent agency's list of approved courses. Petitioner's 3-1/2 months of actual appropriate experience in Ft. Lauderdale, plus his educational background, including the courses taken in California, yield a total of 36 months or 3 years of constructive experience. Petitioner does not yet have the 12 months of actual experience required by the rules but rather, is approximately 8-1/2 months short of the actual experience requirement. Thus, the Petitioner fails to meet the experience requirement necessary for certification as a Class C domestic waste water treatment plant operator at this time, although in approximately 8-1/2 months, he should be able to meet that requirement.

Recommendation Having considered the foregoing findings of fact, conclusions of law, the evidence of record and the candor and demeanor of the witnesses, it is therefore RECOMMENDED: That a Final Order be entered by the Department of Environmental Regulation denying Petitioner's application for certification as a Class C domestic waste water treatment plant operator without prejudice to reapplication at such time as his one year of actual experience at such a treatment facility is completed. DONE and ENTERED this 11 of December, 1990, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11 day of December, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-479 (The Petitioner filed no proposed findings of fact.) RESPONDENT'S PROPOSED FINDINGS OF FACT 1. - 21. are accepted. COPIES FURNISHED TO: Dale H. Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, Esq. General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Phillip G. Panos 2315 N.W. 115 Drive Coral Springs, FL 33065 Francine M. Ffolkes, Esq. Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (1) 120.57
# 1
HIGHLANDS LAKES ESTATES HOMEOWNERS' ASSOCIATION, JOHN W. FROST, II, AND TERRY P. FROST vs REPUBLIC SERVICES OF FLORIDA, L.P., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 09-006750 (2009)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Dec. 15, 2009 Number: 09-006750 Latest Update: Nov. 30, 2010

The Issue The issue is whether Respondent Department of Environmental Protection (DEP) may issue to Respondent Republic Services of Florida, L.P. (Republic), permits to construct and operate a Class III landfill, pursuant to Permit Numbers 266830-003-SC/01 and 266830-004-SO/01, as modified as set forth below.

Findings Of Fact Background On June 30, 2009, Republic filed with DEP an application for a permit to construct and operate a Class I landfill (Application). In response to DEP's request for additional information dated July 30, 2009 (RAI), Republic filed a response dated September 14, 2009 (RRAI), upon receipt of which, DEP deemed the Application to be complete. References to the Application typically include the Application, RRAI, and other materials, such as reports, plans, and drawings, that are part of the Application, as well as three subsequent modifications, which are detailed below. Republic revised several reports, plans, and drawings in the RRAI; references to these items, such as the Engineering Report and Operation Plan, are to the versions contained in the RRAI. On November 13, 2009, DEP filed its intent to issue construction permit #266830- 003-SC/01 (Construction Permit) and intent to issue operation permit #266830-004-SO/01 (Operation Permit; collectively, the Permit). Republic Services, Inc. and its affiliates constitute the second largest waste-management operator group in the United States. Their market capitalization is just over $11 billion. The capitalization of the affiliate formed to operate the subject landfill is doubtlessly less than $11 billion, as the record does not suggest that any significant part of the overall capitalization of Republic Services, Inc., and its affiliates would be at risk in the operation of the proposed landfill. Republic presently owns and operates a Class III landfill in the City of Bartow, Polk County, known as the Cedar Trail Landfill. The oldest part of this landfill is an unlined Class III landfill of 52.5 acres in the center of the property owned by Republic. Immediately west of this unlined landfill is a 30.7-acre lined Class III landfill, which comprises cells 1-4. The Cedar Trail Landfill is located at 2500 West State Road 60, about three miles west northwest of the intersection of State Road 60 and State Road 98, which marks the center of Bartow. The landfill is immediately west of E.F. Griffin Road. Petitioners Frost live on E.F. Griffin Road, about one mile north of the Cedar Trail Landfill. Petitioner Highland Lakes Estates Homeowner's Association serves a residential subdivision known as Highland Lakes Estates. Highland Lakes Estates occupies a notch at the southeast corner of Republic's property. Aerial photographs reveal the changing land use of the land on which Cedar Trail Landfill is situated. Fifty years ago, the land was vacant with indications of agricultural uses. At the site of the proposed landfill were mostly citrus groves on the west side and some rangeland or vacant land on the east side. Ten years later, a large area immediately northeast of the subject land reveals the effects of strip mining for phosphate. Three years later, in 1971, the mined area had greatly expanded to encompass all or nearly all of the subject site and much of the surrounding area, including the western half of what would become Highland Lakes Estates. By 1980, the pits had been refilled and active mining had ceased, and the streets had been constructed for what is now known as Highland Lakes Estates. By 1993, about three dozen homes had been built in this residential, large-lot subdivision. 9. The Cedar Trail Landfill was constructed in the early 1990s as an unlined construction and demolition debris landfill. Now designated an approved landfill for Class III waste, this facility accepts such waste as is defined by Florida Administrative Code Rule 62-701.200(14) (2010), which includes construction and demolition debris, yard trash, processed tires, asbestos, carpet, paper, glass, furniture (but not white goods), plastic, and other materials not expected to produce leachate that presents a risk to the public health or environment. A zoning/land use map reveals that the land for which the proposed landfill is proposed is designated "sewage/borrow pits/spray fields." Highland Lakes Estates occupies land that is designated single-family residential with a density of one dwelling unit on up to 2.49 acres. The Cedar Trail Landfill has been the subject of three recent environmental resource permits (ERPs). Appendix R to the Application is an individual ERP issued in April 2009, and Appendix R to the RRAI is a conceptual ERP issued in March 2005. The April 2009 ERP mentions that the entire stormwater project was conceptually approved by an ERP issued on September 10, 2008, but this ERP is not part of the record. In any event, these ERPs approve the construction of a comprehensive stormwater or surface water management system for the entire Republic property. In particular, the April 2009 ERP permits the construction of a borrow pit at the southeast corner of the Republic property and a modification of the perimeter ditch/wet retention system. The April 2009 ERP states that the permitted stormwater management system will provide total onsite retention for runoff from the 100-year, 24-hour storm. The April 2009 ERP requires 2.8 acres of compensation for 2.8 acres of encroachment in the 100-year floodplain. Specific Condition 14 prohibits excavation of the borrow pits to a clay confining layer or limestone bedrock layer. Specific Condition 20 prohibits the mixing of leachate with stormwater and provides that, if leachate enters stormwater, the stormwater becomes leachate. Presumably reflecting this permitting activity, Application Drawing 4, as revised in the RRAI, is the site plan, including the unlined Class III landfill, the four-cell lined Class III landfill immediately to the west of the unlined landfill, and the eight cells proposed to accept Class I waste. These eight cells are immediately south of the four cells of the lined Class III landfill. The two northernmost of these eight cells abut, on their east boundary, the unlined Class III landfill. The remaining six cells abut, on their east boundary, an 800-foot wide borrow pit, which lies between these cells and Highland Lakes Estates. Immediately north of Highland Lake Estates is a second borrow pit, and west of this borrow pit is the unlined Class III landfill. The other major feature on the site plan is a third borrow pit running, from west to east, along the north border of the lined Class III cells, the unlined Class III landfill, and the second borrow pit. Bearing no signs of ambitious reclamation activity, the backfilled mining cuts host large water storage areas and, as described in the application for the March 2005 ERP, wetlands of "very poor quality." The backfilled soils are best described as complex surficial soils, consisting mostly of fine sands with varying amounts of organics, silts, and clays. Geotechnical investigations of the Cedar Trail Landfill suggest that mining depths, although variable, probably averaged 40 feet. Petitioners and Intervenor are substantially affected by the Permit and the construction and operation of the proposed landfill, which will stand nearly 200 feet above grade and will be the focus of substantial activity six days per week during its years of operation. Like Petitioners, Intervenor owns land in the immediate vicinity of the Cedar Trail Landfill, which is in the jurisdiction of Intervenor, and Intervenor's various municipal operations are much affected by whether the proposed Class I landfill is permitted. Among other things, Intervenor has agreed to accept untreated leachate from the proposed landfill. Petitioners Frost built their home in 1980 or 1981. During the hours of operation of the existing landfill, Petitioners Frost constantly hear the beeping noise of heavy- duty equipment, presumably a safety device when the equipment is moved. Over a dozen lots in Highland Lakes Estates abut the property line of the Cedar Trail Landfill, and the closest residence is about 1000 feet from the nearest proposed Class I cell. At present, the existing landfill subjects the Highland Lakes Estates to constant noise during operating hours and a coating of dust inside their homes. Several residents of Highland Lakes Estates testified. Hard-working people, some of whom are now retired, these residents decided to purchase homes in Highland Lakes Estates because it was a sunny, healthy place to live. Over time, most of these residents, by varying degrees, have come to accept the fact of the Class III operations at Cedar Trail Landfill, but they object to the substantial intensification of land use that will result from a regional Class I landfill. One resident testified that she finds in her pool dirt that has escaped from the existing landfill, and she has become concerned about her grandchildren coming over to swim. Another resident testified that he only began closing his windows five or six years ago when the noise levels at the existing landfill increased; he eventually had to install a window air- conditioner. The same resident testified that the green herons and snowy egrets that he used to see around his house have not returned for five years, and his wife, who has health problems, including respiratory distress, would suffer from the expanded landfill operations. Application, RRAI, and Permit, Including Modifications The Permit incorporates the Application, including the RRAI, Engineering Report, Operation Plan, and drawings. Thus, all of the documents are part of the Permit. In the Application, Republic proposes to convert cells 5-8, which are not yet constructed, from a Class III to a Class I landfill and add four new cells adjacent to the unused cells. The unfilled portion of Cells 1-4 would continue to receive only Class III waste. Pursuant to Florida Administrative Code Rule 62-701.200(13) (2010), Class I waste is all solid waste, other than hazardous waste, that is not otherwise prohibited by rule. The Application states that the proposed landfill will serve communities within 100 miles. The service area of this regional landfill will thus extend in central Florida from Marion to Osceola counties, along the Gulf Coast from Pasco to Lee counties, and along the Atlantic Coast from Volusia to Martin counties. As stated in the Application, this service area is populated by 9.7 million persons, who would daily account for 3000 tons of waste at the Cedar Trail Landfill. Initially, according to the Engineering Report, the proposed landfill will receive 1600 tons per day of Class I waste, but, once the existing Class III cells are filled, the proposed landfill will receive 1600 tons per day of Class I waste plus the 1400 tons per day of the Class III waste that is currently going into the existing landfill. As revised by the RRAI, the life expectancy of the proposed landfill is seven years. The Application states that Republic will employ an attendant, a trained operator, and 3-5 spotters at the landfill. The Application reports that the landfill would operate Monday through Saturday from 7:00 a.m. to 6:00 p.m. and that the working face would be covered daily. The Application reports that Republic would install seven new detection wells and use 17 existing wells for monitoring groundwater and would use two existing staff gauges for monitoring surface water, evidently at a single location, as discussed in the next paragraph. 23. Application Appendix V is the Water Monitoring Plan. Appendix V states that surface water will be monitored every time that the stormwater pond for the leachate storage area discharges offsite, but not more frequently than weekly. Application Drawing 4, as revised in the RRAI, shows that the sole surface water monitoring location is close to the leachate storage tanks, which are described below. 23. Appendix V also requires leachate monitoring, "at least annually," for five field parameters--specific conductivity, pH, dissolved oxygen, colors, and sheens; eight laboratory parameters--including chloride, mercury, and total dissolved solids; and the parameters listed in 40 CFS Part 258, Appendix II, which includes a comprehensive list of volatile organic compounds; persistent organic pollutants, including 2,3,7,8-TCDD (a major dioxin) and Dibenzofuran; and metals, including lead and chromium. Fourteen days prior to all sampling events, Republic is required to notify DEP, so that it may obtain split samples for its own analysis. Republic is required to report the results of the groundwater monitoring quarterly and to analyze the groundwater data in a technical report filed with DEP every two years. Appendix V also requires monitoring for odors and combustible gases, mostly methane. Republic will monitor combustible gas quarterly at various ambient locations, such as the office buildings and to monitor combustible gas quarterly in the soil down to the seasonal high water table. The purpose of this monitoring is to determine combustible gas concentrations and, if they exceed 25%, take "all necessary steps to ensure protection of human health." Some confusion in the Application arises as to the issue of whether the Cedar Trails Landfill will be subject to, or voluntarily implement, the more elaborate provisions applicable to a landfill covered under Title V of the federal Clean Air Act, as amended in 1990. Regulated emissions for a new source might include particulate matter, sulphur dioxide, nitrogen oxides, volatile organic compounds (VOCs), and specified hazardous air pollutants. Appendix V states that the landfill will become a Title V landfill once permitted to receive Class I waste, and, at that time, it will be subject to a "more comprehensive system of landfill gas collection and monitoring." Appendix V assures that these items "will be addressed in separate documentation from this monitoring plan"--and, apparently, separate from the present record. By contrast, the Operation Plan concedes only that, based on the nature of Class I waste and the design capacity of the proposed landfill, Cedar Trail Landfill "may" become a Title V facility. The Operation Plan states: "If the regulatory thresholds at [Cedar Trail Landfill] are met [under Title V] requiring an active gas collection and control system (GCCS), [Cedar Trail Landfill] will submit as required the GCCS design plans for approval and install an active gas extraction system within the regulatory timeframes specified by Title 40, Code of Federal Regulations, Part 60, Subpart WWW." More specific provisions in the Operation Plan identify best management practices to prevent objectionable odors. Four practices are identified, including an "active gas collection and extraction system." On the DEP form application, which is a cover sheet to the more elaborate application materials, Republic checked boxes indicating that the landfill would use active gas controls with gas flaring and gas recovery, which is probably what is meant by an "active gas collection and extraction system." The Application provides that the landfill liner would be double composite; the leachate collections system would consist of collection pipes, geonets, and a sand layer; the leachate would be stored in tanks; some of the leachate would be recirculated as spray on the working face; and the remainder of the leachate would be stored onsite and periodically transferred to a wastewater treatment center for treatment. The Engineering Report states that the waste disposal footprint will not be located where geological formations or other subsurface features will not provide support for the waste. The Engineering Report identifies appendices addressing the slope-stability analysis and foundation analysis and relies on a March 12, 1997, report by Ardaman & Associates, Inc. (Ardaman Report), January 23, 2004, report by Golder Associates, Inc. (Golder Report), and June 26, 2009, report by Hanecki Consulting Engineers, Inc. (Hanecki Report). These items are discussed in greater detail below in connection with the sinkhole issue. The Engineering Report assures that the waste disposal footprint will not be within 500 feet of an existing or approved potable water well, nor will it be within 1000 feet of an existing or approved potable water well serving a community water supply. The Engineering Report adds that the minimum horizontal distance between waste deposits and the property line is 100 feet. The Engineering Report assures that the landfill footprint will not be in a dewatered pit, as the installation elevations are at least 2-3 feet higher than the seasonal high water table. The Engineering Report acknowledges that a small part of the eastern end of the four southernmost cells lies within the 100-year floodplain, as depicted by the Flood Insurance Rate Map effective December 29, 2000, and as shown in Application Appendix A, Drawing 1. Claiming that the relevant map was not revised in 2000, the Engineering Report asserts that the last update to the FIRM map was in 1975, and the depicted floodplain was filled during the mine reclamation process. The Engineering Report notes that the floodplain concerns were addressed in the April 2009 ERP. 34. The Engineering Report discloses two enforcement actions against Republic at the Cedar Trail Landfill. In a letter dated October 19, 2001, DEP warned Republic about noncompliant items at the site, and, in a notice of noncompliance dated January 30, 2006, DEP warned Republic not to use a new cell prior to construction certification of the cell's stormwater system. Both matters were reportedly resolved, and Republic has not been the subject of other enforcement actions for the Cedar Trails Landfill. At DEP's urging, the RRAI elaborates on enforcement actions against Republic or, evidently, Republic affiliates at a variety of Florida facilities, not just landfills. The additional information reveals that DEP imposed a fine of $61,300 for the October 2001 violations, which included disposing of unacceptable waste, storing an excessive number of tires and exceeding groundwater standards without notifying DEP, and a fine of $1000 for the January 2006 notice of noncompliance. The other enforcement actions against Republic or affiliates concerning landfills involved consent orders about the Nine Mile Road Landfill (Seaboard Waste): in February 2003, DEP imposed a fine of $13,000 in settlement of charges that employees were not removing all unacceptable waste from the site and, in November 2005, DEP imposed a $285 fine for a failure to submit required stormwater monitoring reports. There were many other enforcement actions, generally resulting in modest fines, but they involved hauling facilities, transfer stations, and materials recovery facilities, not landfills. The Engineering Report states that the proposed landfill is within six miles of, but greater than 10,000 feet from, the Bartow Municipal Airport. Airport safety is addressed in more detail below. The Engineering Report describes in detail the double composite liner system, which uses materials whose physical, chemical, and mechanical properties prevent failure due to contact with Class I waste and leachate, climactic conditions, installation stress, and other applied stresses and hydraulic pressures. The Engineering Report performs no contingency sinkhole analysis. The report does not suggest that the liner system could withstand the stresses and pressures resulting from any size sinkhole, so the necessary inference is that the liner will fail if any sinkhole forms directly beneath it. The Engineering Report states that waste placement will remain within the lined containment berm. The Engineering Report describes in detail the double composite liner system for use at the proposed landfill. The primary liner system and secondary liner system each comprises three layers with the top layer consisting of a composite drainage net, the middle layer consisting of a high-density polyethylene geomembrane with a minimum average thickness of 60 ml, and the bottom layer consisting of a geosynthetic clay liner with a maximum hydraulic conductivity of 5 x 10-9 cm/second. The Engineering Report describes in detail the leachate collection and removal system, which, sitting atop the primary liner, includes a 24-inch thick sand drainage layer with a minimum hydraulic conductivity of 1 x 10-3 cm/second, a composite drainage net, and a single perforated 8-inch diameter lateral pipe in each cell. The collection lateral pipes will gravity drain to the east to a header pipe that gravity drains to the primary leachate collection pump stations--one station for the four converted cells and one station for the four new cells. A smaller leachate collection and removal system will handle the leachate that penetrates to the leak detection layer by routing it to a secondary leachate collection pump station. Based on calculations derived from the HELP groundwater model, the leachate collection and removal system is designed to prevent leachate head from exceeding the thickness of the composite drainage net (about 1 cm) over the secondary geomembrane and from exceeding one foot over the primary geomembrane. According to the Engineering Report, flow meters will be installed at each of the pump stations to allow daily readings of the amount of leachate being pumped. At one foot of head over the primary liner, the Engineering Report expects just over three gallons per day collected at each secondary leachate collection pump station--significantly less than the leakage rate typical of a double liner system without a geosynthetic clay liner beneath the primary liner. However, the Engineering Report provides a standard action leakage rate of 100 gallons/acre/day, meaning that Republic is required to report to DEP liner leakage only when this leakage rate is attained. The pump stations will transmit the leachate to one of two above-ground, 150,000-gallon storage tanks. From these tanks, most of the leachate will be transported to an offsite location for treatment. However, up to 12,000 gallons per day of the untreated leachate will be recirculated to be sprayed on the working faces of the landfill. This is to control dust and possibly to assist with the degradation of the waste. The Engineering Report states that the Cedar Trail Landfill implements a facility-wide water quality monitoring plan. Upon completion of the pump stations for the eight cells that are the subject of the Application, Republic will expand its leachate sampling program to include annual sampling of the leachate collected in the primary and secondary leachate collection pump stations. The groundwater monitoring wells would be installed as closely as possible to the outer edge of the roadway that, with a stormwater ditch, will run the perimeter of the proposed Class I landfill. In the revised Engineering Report contained in the RRAI, Republic proposes a surface water discharge point in the stormwater pond located near the leachate storage tanks. The Engineering Report adds that Republic will continue to comply with the following prohibitions: No waste will be knowingly burned on site; Hazardous waste will not knowingly be accepted; PCB contaminated waste will not knowingly be accepted; Untreated biomedical waste will not knowingly be accepted. Please note that treated biomedical waste may be accepted at [Cedar Trail Landfill]'s Class I Landfill provided that the waste containers are marked "Treated Biomedical Waste.;" No waste disposal at the proposed Class I Landfill will occur within 3,000 feet of a Class I surface water body; [Cedar Trails Landfill] will not knowingly accept liquid waste within containers, excluding leachate and gas condensate derived from solid waste disposal operations. [Cedar Trails Landfill] will comply with the requirements of Rule 62- 701.300(10), FAC regarding the handling of liquid wastes; Neither oily waste nor commingled oily waste will knowingly be accepted; and Lead-acid batteries, used oil, white goods, and whole-waste tires will not knowingly be disposed of in the Class I waste disposal system. The Joint Stipulation to Permit Modification, identified above, adds four items to this list of operational prohibitions: i. Garbage will not be knowingly accepted; Household Waste, except waste from residential sources generated as Class III waste, will not be knowingly accepted; Animal carcasses will not be knowingly accepted; and Aluminum dross will not be knowingly accepted. Capitalized terms are generally defined in the Florida Administrative Code. Florida Administrative Code Rule 62-701.200(39) defines "Garbage" as " all kitchen and table food waste, and animal or vegetative waste that is attendant with or results from the storage, preparation, cooking, or handling of food materials." Application Appendix H is the Operation Plan, which also identifies the types of wastes to be permitted at the proposed landfill. Section 3(b) of the Operation Plan authorizes the proposed landfill to accept: Commercial waste Ash residue Incinerator by-pass waste Construction and demolition debris, including from a residence Treated biomedical waste Agricultural waste Industrial waste Yard trash, including from a residence Sewage sludge Industrial sludge Water/air treatment sludges Waste tires De minimis amounts of non-hazardous waste from incidental residential sources Section 5 of the Operation Plan provides, in relevant part: [Cedar Trail Landfill] will accept waste included in any of the waste categories identified under Section 3(b) of this Operation Plan[, but] will . . . NOT knowingly accept any hazardous waste, untreated biomedical waste, liquid waste (including paint), explosive waste, toxic waste, or radioactive waste for disposal at the [Cedar Trail Landfill.] Unacceptable types of refuse are listed below and will not be knowingly accepted for disposal. --Hazardous waste --Explosive waste --Radioactive waste --Drums that have not been opened and Emptied --Refrigerators, freezers, air Conditioners (white goods) --Any toxic or hazardous materials, i.e. batteries, solvents, oil, etc. --Automobiles or parts that contain fuel, lubricants, or coolants --Untreated Biomedical waste The original Application prohibited the acceptance of septic tank pumpage, but the application form accompanying the original Application indicated that the proposed landfill would accept industrial sludge and domestic sludge. After modification by the RRAI, the prohibition against accepting septic tank pumpage was deleted, and the Operating Plan added, among acceptable wastes, sewage sludge, industrial sludge, and water- and air-treatment sludge. Florida Administrative Code Rule 62-701.200(101) (2001) defines "sludge" to include solid waste pollution control residual from an industrial or domestic wastewater treatment plant, water supply treatment plant, air pollution control facility, septic tank, grease trap, portable toilet, or other source generating a waste with similar characteristics. Florida Administrative Code 62-701.200(64) (2001) defines "liquid waste" as any waste with free liquids, according to the "Paint Filler Liquids Test." As modified by the Joint Stipulation to Permit Modification, Section 5 of the Operation Plan was amended to add the following items to unacceptable types of refuse that will not be knowingly accepted for disposal: --Garbage --Household Waste, except waste from residential sources generated as Class III waste --Animal carcasses --Aluminum dross At the hearing, Republic and DEP agreed to an additional condition to the Operation Plan that unacceptable waste would include Garbage contained in commercial, industrial or agricultural waste. According to the Operation Plan, the initial waste screening occurs at the gate house where the attendant interviews the driver and inspects the incoming waste load. If the attendant sees more than a negligible amount of unauthorized wastes, he will reject the load and will contact the hauler to identify the source of the waste. Additionally, Republic will notify DEP if anyone tries to dispose of hazardous waste at the proposed landfill. As modified by the Joint Stipulation to Permit Modification, the Operation Plan was amended to provide a new paragraph between the paragraph addressing the initial waste screening at the gate house and, as discussed below, the second screening at the working face. The new paragraph provides: Any malodorous waste will be covered with mulch and/or additional soil or other approved cover materials to control odors promptly, within one (1) hour from the time of unloading, except in the event of exigent circumstances, such as extreme weather. Cedar Trail Landfill will promptly cover any sludge deposited on the landfill working face within one (1) hour from the time of the unloading, except in the event of exigent circumstances, such as extreme weather. At the hearing, Republic and DEP agreed to an additional condition to the Operation Plan, which would prohibit Republic from accepting malodorous waste or sludge that, due to exigent circumstances, it would not be able to cover within one hour from the time of unloading. If the load passes the initial waste screening, it will proceed to the working face of the landfill, according to the Operation Plan. At least one spotter will be stationed at the working face at all times that the landfill receives waste. Her job will be to detect unauthorized wastes. Republic is to assure that it has a sufficient number of spotters to find and remove unauthorized waste prior to compaction. The Operation Plan allows the spotter to work from ground level or the cab of a compactor. If the operator of a piece of heavy equipment is trained as a spotter, she may also serve as a spotter. During periods of higher waste traffic, the equipment operator will, according to the Operation Plan, "likely" need the assistance of another operator or spotter to screen the higher waste volumes. When finding unauthorized wastes in manageable volumes, the spotter or operator will remove these wastes by hand and place them into nearby containers for removal to an appropriate facility. The third waste screen occurs as the equipment operator spreads the waste, pursuant to the Operation Plan. The equipment operator is required to place any unacceptable observed wastes into containers, which will be located "within the lined area." These wastes will also be removed to an appropriate facility. In the RAI, DEP questioned the proximity of the containers to the working face, as the lined area consists of 72 acres, but, in the RRAI, Republic ignored the comment, restating only that the containers would not be located outside the lined area. The Operation Plan specifies a filling sequence. Republic will assure that the first layer of waste placed above the liner in each cell will be a minimum of four feet in compacted thickness and will be free of rigid objects that could damage the liner or leachate collection and removal system. Republic will maintain the working face to minimize the amount of exposed waste and initial cover necessary at the end of each day. The filling sequence will proceed until the permitted final grade elevations have been reached, less three feet for the final cover. The Operation Plan states that the initial cover at the Class I landfill will consist of a six-inch layer of soil that is transferred from onsite borrow pits or offsite sources. This soil will be compacted and placed on top of the waste by the end of each work day. At Republic's option, subject to DEP's approval, it may use a spray-on or tarpaulin cover, instead of a soil cover. The Operation Plan requires Republic to apply at least one foot of intermediate cover within seven days of cell completion, if additional waste will not be deposited within 180 days of cell completion. Republic may remove all or part of this intermediate cover before placing additional waste or the final cover. Through the placement of initial, daily, and intermediate cover, Republic will minimize the occurrence of moisture infiltration, fires, odors, blowing litter, and animals and other disease vectors. 59. The Operation Plan requires Republic to control litter primarily by daily waste compaction and cover. However, at least daily, if needed, employees will collect litter along the entrance and access roads and around the working face. Complaints about litter must be logged. In addition to the inspections detailed above, the Operation Plan establishes a random load-checking program to detect unauthorized wastes. Each week, Republic employees will examine at least three random loads of solid waste by requiring drivers to discharge their loads at a designated location within the landfill where the employees may undertake a detailed inspection. All random inspections will be logged. Notwithstanding the daily limit of 12,000 gallons per day, the Operation Plan prohibits Republic from spraying leachate during rain events. To apply the recirculated leachate, the lead operator will drive the leachate tanker truck on the working face, so that it can spray leachate over waste as it is being compacted, but after it has been screened by spotters. The spraying will be done to avoid causing leachate to pond atop the waste and will not be done within 50 feet of an outside slope. No restrictions apply to wind conditions. The Operation Plan states that, if the annual sampling of leachate water quality at the two pump stations reveals a contaminant in excess of the permissible limits listed in 40 CFR Part 261.24, Republic will start monthly sampling and notify DEP in writing. Also, the Cedar Trail Landfill will maintain a recording rain gauge. The Operation Plan requires Republic employees to conduct daily surveys for objectionable odors and take immediate corrective action, if odors are found at the property line. As modified by the Joint Stipulation to Permit Modification, this portion of the Operation Plan was amended to add two odor- remediation actions and another form of odor inspection. The two additional actions to prevent odors are to 1) provide additional cover using mulch, additional soil, or other approved cover material and 2) use odor masking or neutralizing agents. The new inspection provision states: Internal inspection will be performed on a weekly basis by a properly trained odor ranger or equivalently trained person. Such individual will tour the facility, property boundary, and the subdivision of Highland Lakes Estates . . . to identify any odors leaving the Landfill's property boundaries. The results of each weekly inspection will be document, and any odors identified will be mitigated. Another new provision from the Joint Stipulation for Permit Modification applies to the handling of sludge. As amended, the Operation Plan states: When accepting sludge from a new source or distributor, [Republic] will obtain information regarding the characteristics and constituents of the sludge, including a description of the industrial process or circumstances that resulted in the generation of the sludge. Upon delivery of the sludge, [Republic] will mix lime, sodium hydroxide, or any other suitable agents to eliminate objectionable odors as required during disposal of the sludge before the material is covered. Furthermore, [Republic] will obtain advance notice from contributors prior to delivery of any sludge and shall promptly cover any sludge unloaded on the landfill working face within one (1) hour from the time of unloading, except in the event of exigent circumstances, such as severe weather. [Republic] shall use its best efforts to avoid accepting or disposing of sludge on Saturdays, Sundays, or public holidays. Additionally, with respect to sludge received from wastewater treatment facilities only, such sludge shall not exceed the lesser of (1) twenty percent (20%) of the total volume of waste disposed in the landfill on an average monthly basis, determined annually on the prior calendar year, or (2) two-hundred (200) tons per day, averaged over the prior 12-month calendar year. Republic is required to monitor combustible gases quarterly and transmit the results to DEP, according to the Operation Plan. If Republic detects methane above the limits specified in Florida Administrative Code Rule 62-701.530 (2010), Republic must submit a gas remediation plan to DEP within seven days. The Operating Plan indicates that the separation of the waste from the groundwater prevents the saturation of the waste and, thus, the generation of odor. Sloping and compacting will promote stormwater runoff, again to discourage the generation of odor. The Construction Permit authorizes construction of the proposed landfill in accordance with the "rules[,] . . . reports, plans and other information" submitted by Republic "(unless otherwise specified)." This parenthetical reference provides that the provisions of the Construction Permit control over any contrary provisions in the other documents that are part of the Permit due to incorporation by reference. In addition to the original Application, RRAI, and drawings, the Construction Permit also incorporates Florida Administrative Code Chapter 62-701 (2001). The Construction Permit states that Republic may not violate the prohibitions set forth in Florida Administrative Code Rule 62-701.300, which is discussed in the Conclusions of Law. Construction Permit Specific Condition A.9.a requires notification to DEP of the discovery of limestone during excavation or discovery. Specific Condition A.9.b requires notification to DEP of any surface depressions or other indications of sinkhole activity onsite or within 500 feet of the site. Specific Condition A.9.c prohibits open burning. Construction Permit Specific Condition C.1.b prohibits the discharge of leachate, during construction or operation, to soils, surface water, or groundwater outside the liner and leachate management system. Specific Condition C.4 prohibits the acceptance of hazardous waste and does not condition this prohibition on Republic's knowledge that the waste is a hazardous waste. Specific Condition C.5 requires Republic to "control . . . odors and fugitive particulates (dust)" and "minimize the creation of nuisance conditions on adjoining property." "Nuisance conditions" include "complaints confirmed by [DEP] personnel upon site inspection." Specific Condition C.5 orders Republic to "take immediate corrective action to abate the nuisance" and to "control disease vectors so as to protect the public health and welfare." Construction Permit Specific Condition C.6.b requires immediate notice to DEP of any sinkholes or other subsurface instability. Specific Condition C.8 requires Republic to manage leachate in accordance with the Operating Permit and Florida Administrative Code Rule 62-700.500(8). The Operating Permit incorporates the same materials that are incorporated into the Construction Permit, again "(unless otherwise specified)." Like the Construction Permit, the Operating Permit incorporates Florida Administrative Code Chapter 62-701 (2001) and requires immediate notice to DEP in the event of a sinkhole or subsurface instability. The Operating Permit specifies that the action leakage rate is 100 gallons per acre per day and the leachate recirculation rate is 12,000 gallons per day. As modified by the Joint Stipulation to Permit Modification, Operating Permit Specific Condition A.1.b states: This Facility is not authorized to accept Garbage; untreated Biomedical Waste; animal carcasses; liquids and non-liquid PCB containing materials or wastes with a PCB concentration greater than or equal to 50 parts per million; Liquid Waste; and aluminum dross. Additionally, this facility is not authorized to accept Household Waste, except waste from residential sources generated as Class III waste. Class III waste means yard trash, construction and demolition debris, processed tires, asbestos, carpet, cardboard, paper, glass, plastic, furniture other than appliances, or other materials approved by [DEP] that are not expected to produce leachate which are a threat to public health or the environment as defined in Rule 62-701.200(14), F.A.C. Based on this authorization to allow certain wastes as described above from residential sources, and since the landfill design, including liner and leachate collection systems, meets the requirements of Chapter 62-701, F.A.C., for Class I landfills, the facility will be entitled to [the] household hazardous waste exemption pursuant to 40 C.F.R. 261.4(b)(1). Specific Condition A.9.c prohibits open burning. Operating Permit Specific Condition C.1.b prohibits the discharge of leachate to soils, surface water, or groundwater outside the liner. Specific Condition C.1.c prohibits the discharge of "residual contaminants," such as gasoline, oil, paint, antifreeze, and polychlorinated biphenyls (PCBs), onto the ground or into surface water or groundwater. Operating Permit Specific Condition C.1.k(1) provides that authorized waste types are those listed in Section 3(b) of the Operations Plan, and unacceptable wastes shall be removed from the site as described in Sections 3(a) and 7. As modified by the Joint Stipulation to Permit Modification, Operating Permit Specific Condition C.1.k(1) provides: "Waste types authorized for management at this site are those listed in Section 3(b) of the Operations [sic] Plan. Unacceptable wastes are those listed in Section 5 [of the Operation Plan] " Operating Permit Specific Condition C.1.k(2) requires the use of a sufficient number of spotters to remove unacceptable wastes, but allows Republic to direct its equipment operators to serve as spotters from the equipment. This condition allows DEP to require that spotters work from the ground, if DEP determines that spotting from equipment is not effective. Specific Condition C.1.k(3) requires Republic to remove unacceptable wastes immediately and not to unload additional wastes in the immediate vicinity until placing unacceptable wastes in the designated waste containers" "near the working face" and within the lined landfill area. Operating Permit Specific Condition C.1.l(2) requires Republic to inspect on each operating day the property boundary for objectionable odors and, if any are detected, abate them in accordance with Specific Condition C.5. Specific Condition C.5.a requires Republic to control odors, disease vectors (insects and rodents), and fugitive particles (dust and smoke) to protect the public health and welfare. Control is defined as "minimiz[ing]" the creation of nuisance conditions on adjoining property. Odors confirmed by DEP personnel are a nuisance condition, and Republic must take immediate corrective action to "abate" the nuisance. Specific Condition C.5.b provides that, if odor control measures do not "sufficiently abate" objectionable odors within 30 days, Republic will submit an odor remediation plan to DEP for approval. Operating Permit Specific Condition C.8.e requires monthly reports to DEP of leachate quantities. Specific Condition C.8.h(1) prohibits recirculation of leachate at rates that result in seepage that may discharge outside the lined area. Leachate may not be sprayed when the application area is saturated or during a rainfall event. There is no prohibition against spraying during windy conditions. Operating Permit Specific Condition E details the extensive water quality monitoring requirements. However, Specific Condition E.9.b requires only annual testing of the five field parameters, eight laboratory parameters, and the comprehensive list of Appendix II parameters set forth in 40 CFR Part 258, all of which are identified below. Specific Condition E.9.c provides that, if a contaminant listed in 40 CFR 261.24 exceeds the level listed therein, Republic will notify DEP and take monthly leachate samples until no exceedances are detected for three consecutive months. Operating Permit Specific Condition F.1.a states: "This solid waste permit will meet the statutory requirement to obtain an air construction permit before . . . constructing a source of air pollution, except for those landfills that are subject to the prevention of significant deterioration (PSD) requirements of Chapter 62-212, F.A.C." Such facilities are required to obtain an air construction permit from the Bureau of Air Regulations prior to construction. Specific Condition F.1.b requires Republic to comply with Title V of 40 CFR 60, Subparts WWW and CC. This section notes that Title V permit applications must be submitted to the District Air Program Administrator or County Air Program Administrator responsible for the landfill. Aviation Safety Landfills attract birds in search of food. Flying birds may interfere with aviation safety. Thus, landfills are typically not located in close proximity to airfields to minimize the risk that flying birds will interfere with airborne aircraft approaching or departing from an airport. The nearest airport to the Cedar Trail Landfill is the Bartow Municipal Airport, which is operated by the Bartow Aviation Development Authority. This airport is over five miles from the footprint of the active landfill and 4.6 miles from the boundary of the proposed site. Republic provided notice of the Application to all airports within six miles of the proposed landfill, the Federal Aviation Administration, and the Florida Department of Transportation. None of these entities objected to the proposed landfill. When Republic gave the Bartow Aviation Development Authority notice of an earlier application, which sought a permit for a landfill that would accept garbage, the authority objected to the proposal due to concerns posed by birds to aviation safety. When asked about the Application, the authority's executive director testified that she still has concerns about the proposed landfill, but she did not specify the nature of her concerns or her analysis. As explained in the Conclusions of Law, these are the only facts required for a determination of whether Republic has provided reasonable assurance of aviation safety. The record provides no basis for finding that Republic has failed to provide reasonable assurance of aviation safety. Neither the FAA nor the Bartow Aviation Development Authority has objected to the proposed landfill. The executive director's unspecified concerns do not override the absence of a formal objection from these agencies. Petitioners assign too much weight to the earlier objection submitted by the authority. The composition of the authority may have changed or some authority members may have decided they were wrong in their earlier analysis. This earlier objection does not outweigh the absence of objection to the present proposal from any of the aviation agencies and the absence of any evidence of the expected nature or extent of bird usage of the proposed landfill and the extent to which these birds would interfere with existing and expected flight paths of aircraft using the Bartow Municipal Airport. Public Health Petitioners' expert witness on public-health issues, Dr. David Carpenter, is a medical doctor with a long, prestigious history of public service, including with the Department of Defense, the National Institutes of Mental Health, the United States Public Health Service, and the New York Department of Health, where he served as director from 1980-85. At that time, Dr. Carpenter started the School of Public Health at the University of Albany. Republic's expert witness on public-health issues, Dr. Christopher Teaf, is an expert in the evaluation of environmental contamination, waste management, and toxicology, but not a medical doctor. Dr. Teaf is a professor at Florida State University and owns a small consulting firm. The major part of Dr. Carpenter's career has been devoted to research. For the past ten years, he has focused more on human health, especially human disease from exposure to environmental contaminants. Dr. Carpenter has considerable experience with the adverse effects of landfills on human health, but his experience has been mostly with older landfills, where containment measures were few and offsite releases were many. Clearly, Dr. Carpenter's experience does not extend to the role of landfill design, construction, and operation in the transmission of human disease. Thus, Dr. Carpenter is qualified to opine on the effects of pollutants that may escape landfills, but not on the relationship of landfill design, construction, and operation on the probability that a landfill will transmit pollutants. For the most part, Dr. Carpenter did not attempt to address matters outside of his expertise. However, Dr. Carpenter testified that the risk of disease or injury increased in relationship to the proximity of the person to the landfill. This testimony can only be credited if one assumes that the landfills are identical in terms of design, construction, and operation and in terms of the environmental conditions of the landfill site. In other words, in real-world applications, it is impossible to credit this element of Dr. Carpenter's testimony, especially to the extent of his implicit suggestion that public health is unreasonably endangered by the construction of a landfill, in compliance with all rules, that satisfies all of the separation criteria and design criteria set forth in the rules, as discussed below. By contrast, Dr. Teaf focused on the details of the proposed landfill. Applying his knowledge of toxicology, Dr. Teaf determined that the proposed landfill adequately protects public health. In making this determination, Dr. Teaf analyzed the effects of various design and operational characteristics of the proposed landfill, including the double liner system, the leachate collection and management system, the selection of appropriate waste types, the procedures for the evaluation and covering of sludges, the prohibition against municipal garbage, the restrictions on household items, the monitoring of groundwater and surface water, the stormwater management system, and the plans to control dust and odors. Dr. Carpenter's testimony and the literature that he sponsored suggested important links between older landfills and a wide range of human disease. But the recurring problem with Dr. Carpenter's testimony and the research articles that he sponsored was the inability to link this information to the proposed landfill. All of the landfills studied in his research articles were older, and most of them appeared to have been designed, constructed, and operated under far more relaxed regulatory regimes than exist today. Nothing in Dr. Carpenter's testimony or sponsored literature attempted to delineate the design or operational characteristics of these landfills, such as whether they were double- or even single-lined, served by leachate circulation and recovery systems, limited as to materials that they could accept, or required to install stormwater management and water monitoring systems. 93. Analysis of the risk to public health posed by the proposed landfill requires consideration of the various means of transmission of the pollutants received by the landfill: water, land, and air. Of these, water requires little analysis, on this record. Even Dr. Carpenter conceded that the proposed landfill does not appear to pose a threat to groundwater. The double liner, leachate collection and recovery system, and groundwater monitoring plan support the finding that groundwater transmission of pollutants from the proposed landfill is unlikely. Transmission by surface water is also unlikely. Compared to groundwater monitoring, surface water monitoring is limited. For instance, there is only a single monitoring site. Also, as noted above, the stormwater pond for the leachate storage area is expected to discharge stormwater offsite during excessive storm events, at which time surface water samples will be taken. However, a comprehensive surface water management system is in place at the landfill and will prevent offsite discharges in all but a few excessive rain events. Transmission by land is also unlikely. The Application contains engineering analysis of the proposed stability of the side slopes and a determination that they will be stable. The discussion of sinkholes, below, does not affect this finding. Treating dust as transmission by air, the only other means by which pollutants may transmit by land is by animals, such as insects, rodents, and birds. An important factor limiting the activity of animals in spreading pollutants offsite is the fact that the proposed landfill will not receive garbage. Although putrescible waste may be received within other categories of waste, the prohibition against receiving garbage will greatly reduce the amount of potential food sources for animals and thus the utilization rate of the proposed landfill by these animals. A further reduction in animal utilization will be achieved through the daily and intermediate cover requirements. Thus, transmission of pollutants by animals is also unlikely. Transmission by air takes several forms. Pollutants may be transmitted as or on dust, with water in the form of aerosol, or as gas. In terms of how transmission by air is addressed by the Permit, this means of transmission potentially represents a greater threat than transmission by water or land for four reasons. First, the explicit focus of the Permit, as to gas, is to avoid explosive concentrations of methane and objectionable odors, but not the transmission of other pollutants by air. Second, the effect of the Permit is to prohibit the release of pollutants into the groundwater or offsite surface water and to prohibit the release of pollutant-bearing land offsite, but no such flat prohibition applies to the offsite release of pollutants by air. Third, the leachate recirculation system provides a good opportunity for the release of certain pollutants into the air by aerosol or evaporation, but similar releases to offsite land, surface water, or groundwater are prohibited. Fourth, scientific understanding of the effects of exposure, especially by inhalation, to pollutants, especially in the form of organic compounds, is continuing to develop: with the use of chemicals increasing three fold in the 50 years preceding 1995 and approximately 80,000 chemicals in use in 2002, only a few hundreds of these chemicals have been subjected to long- or short-term study, resulting in the discovery that about 10% of the chemicals in use in 2002 were carcinogens. Transmission by dust appears to be limited by the frequent covering and spraying of the working faces. Although nearby residents complain of dust in their homes, the practices of the less-regulated Class III landfill cannot be extrapolated to the proposed Class I landfill. Thus, the prospect of dust transmission of chemicals contained in the fill received by the proposed landfill appears also to be slight. The use of untreated leachate as the spray medium to control the dust itself raises two risks, however. First, spraying leachate will release chemicals in aerosol. The potential range of aerosol is great, especially as the landfill ascends toward its design height of 190 feet. However, the risk of transmission by aerosol is reduced to insubstantial levels by adding a Permit condition that prohibits spraying during windy conditions. Second, depositing leachate on the landfill face will release chemicals through evaporation. The point of spraying the landfill face is to control dust between the addition of the waste materials to the pile and the application of the cover. Between these two events, dry conditions will sometimes intervene and may cause the evaporation of certain, but not all, pollutants. The leachate acquires pollutants as it percolates down the waste column and into the leachate collection system. As Dr. Teaf noted, the leachate becomes more concentrated as it recirculates, but, otherwise, this record is largely silent as to the likely composition of the recirculated leachate. However, for landfills accepting sludge, higher levels of mercury may be present in the leachate. As reported by the Florida Center for Solid and Hazardous Waste Management at the University of Florida, in a report issued March 2007, and titled, "Design and Operational Issues Related to Co-Disposal of Sludges and Biosolids and Class I Landfills--Phase III," one study found that the concentration of mercury in the leachate of landfills that receive sludge is almost three times greater than the concentration of mercury in the leachate of landfills that do not accept sludge. The same study reported that total dissolved solids and chlorides were present at greater concentrations at the landfills that did not accept sludge and that other parameters--unidentified in the cited article--were not significantly different between the two types of landfills. Republic proposes to recirculate substantial volumes of leachate--sufficient, for instance, to raise the moisture content of the fill from 25 percent to 28.9 percent. The Permit allows the proposed landfill to operate six days per week, for a total of 312 days annually. The Operation Plan prohibits the application of leachate during rain, but the number of days annually during which rain extends for the entire day is few, probably no more than a dozen. These numbers suggest that Republic may apply as much as 3.6 million gallons annually of untreated leachate to the landfill face. The 12,000 gallon-per-day limit and restrictions on head in the leachate collection and removal system effectively limit the quantities of leachate that may be recirculated, but the sole provision addressing leachate water quality is the annual monitoring event described above. Given the time required to analyze the many parameters included in the EPA regulation, for most of the year between tests, Republic will be applying over three million gallons of leachate whose pollutant concentrations will be completely unknown. Some assurances emerge, though, when considering air transmission of pollutants by class. In general, on this record, as to transmission by gas, there appears to be an inverse relationship between a compound's volatility, which is a measure of its ability to enter the air, and a compound's persistence. VOCs are one of the most dangerous classes of pollutants to public health and include such carcinogens as benzene, tolulene, xylene and, the most dangerous of all VOCs, vinyl chloride, which is released upon the degradation of such common substances as plastics, carpets, and upholstery. Biogas, which is generated by the anerobic decomposition of organic compounds in a landfill, contains mostly methane and carbon dioxide, but also significant levels of VOCs. When inhaled, the primary results of exposure to VOC are respiratory irritation and allergenic effects. Volatility is measured by vapor pressure, which is a measure of a chemical's ability to get into the air. As their name suggests, VOCs enter the air easily. They are also capable of traveling great distances due to their light molecule. However, VOCs are easily destroyed by sunlight and diluted by wind. Other organic compounds common to landfills are only semi-VOCs, such as PCBs. Although less volatile, these chemicals, too, are hazardous to public health--in the case of PCBs, in any amount. Due to this fact and their persistence in the environment, the United States has prohibited the manufacture of PCBs for over 30 years. However, not only are PCBs considerably less likely to enter the air than VOCs, they also travel shorter distances than VOCs due to a heavier molecule. Dr. Carpenter opined that there is little evidence that PCBs are an issue in the proposed landfill. Another class of organic compound, 1000 times less volatile than even PCBs, is phthalates, which are used in the production of plastics. Phthalates pose significant threats to public health, especially reproductive health. However, the exceptionally low volatility of this compound renders transmission by evaporation highly unlikely. Much of the regulatory framework imposed on landfill design, construction, and operation arises out of concerns for the control of human pathogens, which are infection-causing organisms, such as bacteria, viruses, protozoa, and parasitic worms. One of the great advances in human longevity in the United States occurred in the early 1900s--not with the development of antibiotics or improved medical care--but with the implementation of basic sanitation control and the removal of pathogens from the drinking water. For the proposed landfill, sludge will be the primary source of pathogens. Sludge is nutrient-rich organic matter, which will be received at the proposed landfill without any treatment except possibly dewatering. Even with the acceptance of sludge, the proposed landfill presents little risk for the transmission of pathogens. Pathogens communicate disease only when a person is exposed to an effective dose and are better transmitted by direct contact or animal than air. Bacterial pathogens are themselves killed by wind, as well as sunlight, temperature, and humidity differentials, so the preferred means of air transmission would be aerosol versus gas. The record permits no findings as to the persistence of pathogenic viruses, protozoa, and parasitic worms. However, as noted above in connection with the land transmission of pathogens, the immediate application of lime and cover to the sludge will tend to prevent the release of effective doses of pathogens by air, as well. The last major class of pollutant that could be transmitted by air is heavy metals, such as mercury or lead. Although these metals produce a wide range of neurological diseases and generally interfere with cognition and behavior, Dr. Carpenter admitted that heavy metals were not as much of a concern as VOCs, presumably due to their resistance to vaporization. Even though transmission by air is not as tightly controlled as transmission by water or land, for the four reasons noted above, there is little risk of transmission by air--i.e., dust, aerosol, or gas--when the specific properties of likely pollutants are considered. In all but five respects, then, Republic has provided reasonable assurance that public health will not be endangered by pollutants released from the landfill by water, land, or air. First, to provide reasonable assurance concerning public health, the Permit needs a condition that prohibits spraying leachate during windy conditions, which DEP may define as it reasonably sees fit. As noted in the Conclusions of Law, this is a requirement in the rules and, due to its importance, should be restated explicitly in the Permit, which restates numerous other rule requirements. Second, to provide reasonable assurance concerning public health, the Permit needs more frequent monitoring of leachate water quality, at least at the frequency, as noted in the Conclusions of Law, set forth in the rules. Large volumes of untreated leachate will be recirculated through the landfill. Even if aerosol transmission is controlled, transmission by evaporation of some pollutants, although not the heavy metals, is possible. Also, pollutants are concentrated in recirculated leachate and thus the consequences of transmission into groundwater or surface water, however unlikely, become greater. At the same time, the action leakage rate is generous--to Republic, not the groundwater. At 100 gallons per acre per day, Republic is not required to report to DEP possible liner leakage until about 7300 gallons per day are lost to the surficial aquifer. Suitable for the detection of catastrophic failures associated with most sinkholes, this action leakage rate is too high to trigger action for small liner leaks. If Republic is to be allowed this much leakage into the groundwater, it must identify the leachate's constituents and their concentrations at least semi-annually. Third, to provide reasonable assurance concerning public health, the Application must extend the right of split testing to all of the parties in these cases, if DEP fails to exercise its right to take a split sample. The spraying of untreated leachate and generous limit applied to liner leakage before reporting and remedial action are required underscore the importance to public health of independent leachate testing. There is no reason to allow budgetary constraints or administrative oversight to preclude Petitioners and Intervenor, who are uniquely situated to suffer from the escape of excessive pollutants in the leachate, from providing, at their expense, this independent leachate testing. Fourth, to provide reasonable assurance concerning public health, the Permit needs to restate accurately the language of the rules concerning the extent of knowledge required of Republic, if it is to be liable for the acceptance of certain prohibited wastes. Fifth, to provide reasonable assurance concerning public health, the Permit needs to be modified to ensure that at least one spotter, whose sole responsibility is spotting, will be assigned to each working face while the landfill is receiving waste. Sinkholes The sinkhole issue arises in the geotechnical analysis of the sufficiency of the foundation to support the considerable loads of a landfill and also in the stability of the side slopes of the landfill. This analysis starts with consideration of the geology of the area, of which Republic's property is a part, and, among other things, the potential for sinkhole formation in the area. The Cedar Trail Landfill lies within the Bartow Embayment and along the eastern slope of the Lakeland Ridge of the Central Lake District Physiographic Province. This embayment is a large erosional basin partially backfilled with phosphatic sand and clayey sand of the Bone Valley Member. At this location, the top of the Floridan Aquifer is formed by Suwannee Limestone, which consists of white to tan, soft to hard, granular, porous, very fossiliferous limestone with interbedded dolomite. This rock unit is 110-140 feet thick. Atop the Suwannee Limestone sits the Hawthorne Group, which comprises the Arcadia Formation, at the base of which is the Nocatee Member, which is a relatively impermeable sand and clay unit. Atop the Nocatee Member is the Tampa Member, which consists of hard, dense, sandy, locally phosphatic, fossiliferous limestone. The top of this member, which is the top of the Arcadia Formation, is locally referred to as the "bedrock complex," which marks the lower limit of phosphate mining. Atop the Arcadia Formation, still within the Hawthorne Group, sits the Peace River Formation, which consists of phosphatic clayey sand and clayey sand. The lower portion of the Peace River Formation is a relatively impermeable, undifferentiated clayey unit locally known as "bedclay." The Bone Valley Member of the Peace River Formation is mined for phosphate and is locally known as "matrix." Atop of the Peace River Formation are undifferentiated surficial soils, typically consisting of silty sand, clayey sand, and some hardpan and organic soils. These materials are locally known as "overburden." Phosphate mining is prevalent in the area, including, as noted above, much or all of the Cedar Trail Landfill site. Strip mining for phosphate normally removes the entire surficial aquifer, just into the bedclay. Mined areas are then backfilled with overburden spoil soils, clay, waste clay, and sand tailings. After backfilling, the soil strata bear little resemblance to premining strata. Sinkholes are prevalent in the general area surrounding the Cedar Trail Landfill. A sinkhole is a surface depression varying in depth from a few feet up to several hundreds of feet and in area from several square feet to several acres. Sinkholes are typically funnel-shaped and open broadly upward. Sinkholes form when weakly acidic groundwater creates cavities in the calcium carbonate within limestone. Soils above these cavities erode into the cavities. In the area that includes the Cedar Trail Landfill, cover-collapse and cover- subsidence sinkholes predominate among sinkhole types. A cover-collapse sinkhole, which is typically steep- sided and rocky, forms when cohesive soils over a limestone cavity can no longer bridge the cavity under the weight of overlying soil and rock. At this point, the cohesive soils suddenly collapse into the cavity. These are more common in the part of the state in which the Cedar Trail Landfill is located. A cover-subsidence sinkhole occurs due to the gradual lowering of the rock surface as solutioning occurs in the subsurface rocks. This type of sinkhole develops as subsurface soluble rock is dissolved and overlying soils subside into the resulting shallow surface depressions. Regardless of the type of sinkhole, borings into sinkholes will reveal zones of very loose soil sediments that have washed downward into the cavernous voids within the bedrock. This very loose soil zone is called a raveling zone, which starts at the limestone layer, as the overlying soils begin to collapse into the solution features within the limestone. As the loosening works its way upward toward the surface, it eventually results in the subsidence of the ground surface and formation of a sinkhole. Considerable sinkhole activity has taken place in the immediate vicinity of Republic's property. Most visibly, a sinkhole formed in 2006 in 285-acre Scott Lake, 4.5 miles northwest of the landfill. This sinkhole drained the entire lake and destroyed several structures. The Florida Geological Service sinkhole database, which consists of anecdotal reports of sinkhole activity, some of which are unverified, includes 49 sinkholes within five miles of the proposed landfill. Two documented sinkholes have occurred within .17 mile of the landfill--one of which is reported to be 125 feet in diameter and 80 feet deep. Based upon the information contained in the preceding paragraph, Clint Kromhout, a professional geologist with the Florida Geological Survey, opined on August 23, 2009, that the potential for sinkhole formation "within the proposed site and surrounding area" is "low to moderate." Mr. Kromhout does not provide a definition of "low," but part of his opinion is shared by the Golder Report, which agrees that the sinkhole potential on the proposed site is "low." The potential for sinkhole formation in the general area surrounding the proposed landfill, as distinguished from the site itself, is at least moderate. In their Proposed Recommended Order, Republic and Intervenor necessarily concede: "All parties acknowledge that the proposed landfill site is in a general region that has a relatively high frequency of sinkholes as compared with the rest of the state of Florida." It is misleading to characterize the area surrounding the proposed landfill as of low potential for the formation of sinkholes, unless there is another category, like "nonexistent." But characterizing the sinkhole potential of the surrounding area as moderate is not determinative of the likelihood of sinkholes at the landfill's footprint, nor is a site-specific geotechnical investigation mooted by such a characterization. Rather, characterizing the sinkhole potential of the surrounding area as moderate dictates the intensity and scope of the ensuing geotechnical investigation, if the investigation is to provide reasonable assurance of the structural integrity of the proposed landfill. Acknowledging moderate potential for sinkhole formation in the surrounding area, Republic has appropriately relied on three geotechnical reports, including three sets of boring data. The final of these reports, the Hanecki Report, is based on the collection and analysis of boring data, as well as a review of the data and analysis contained in the two earlier geotechnical reports, the Ardaman Report and Golder Report. The boring data reveal that the proposed landfill site features four units. Nearest the surface is Unit 1, which is brown to dark brown, medium- to fine-grained sand with minor amounts of clayey silt. Unit 1 is 0-10 feet thick. Next down is Unit 2, which is tan to gray, medium- to fine-grained sand with increasing silty clay or clayey silt. Unit 2 is 5-10 feet thick and generally marks the upper limit of fine-grained, granular soils (i.e., clayed sands and silty sands). Unit 3 is orange brown to yellow brown, gray and tan silty clay to clayey silt or fine sand and silty clay. Unit 3 is 5-15 feet thick. Unit 4 is gray and tan clayey silt or silty clay with minor amounts of fine sand. This material is very stiff or very dense, and most borings terminated in this unit. The few borings that penetrated this unit suggest that it may consist of dolomitic sandy clays and silts and dolomitic limestone to depths greater than 100 feet below grade. Units 3 and 4 generally mark the upper limits of low permeability/low compressibility soils. The Hanecki investigation comprised two main steps. First, Hanecki retained a subconsultant to perform electrical resistivity imaging (ERI) along 100-foot-wide transects run across the site. Any anomalies revealed by the ERIs were to be followed by standard penetration test (SPT) borings, which permit soil testing at predetermined intervals, as well as a measure of the compressibility of the soils. Compressibility is measured during the soil-testing intervals, during which the drill bit is replaced by a soil sampler. The driller records the number of blows required for a 140-pound hammer falling 30 inches to produce 12 inches of penetration. The value is expressed in N-values, where N represents the number of such blows. Looser soils produce lower N values. Another important piece of information obtained during SPT boring is the partial or total loss of circulation fluid during drilling. While the drill is penetrating soil, a slurry circulates through the borehole to prevent the collapse of the sides of the hole. This slurry is recycled during drilling, but, if the drill encounters a void, all or part of the circulation fluid is lost. The ERI survey revealed no real anomalies because of a narrow range of resistance values. However, taking relatively small differences in resistivity as an anomalies, Hanecki identified 14 features of interest. At each of these locations, Hanecki performed an SPT boring. Because the ERI transects were unable to span the two onsite ponds, Hanecki added two locations for SPT borings adjacent to each side of each pond, for a total of four additional SPT borings. At the request of DEP, Hanecki added a nineteenth SPT boring at Golder site G-11, which had revealed low N-values during Golder's borings. Hanecki extended the borings into "refusal" quality soil, which was defined as soils requiring more than 50 blows of the 140-pound hammer to achieve six inches or less of penetration. All of Hanecki's SPT borings encountered very hard limestone. Among the most significant findings of Hanecki's borings, only one boring, G-11, experienced any circulation fluid loss, and this was estimated at 50 percent. However, it is more likely that this partial circulation fluid loss is due to loosely deposited sands than a void that might be indicative of conditions suitable for sinkhole formation. Not all circulation losses indicate voids that that will result in sinkhole formation. Also significant among Hanecki's findings is a clayey soil, or bedclay, at every SPT boring, which severely limits hydraulic recharge to the limestone. By impeding vertical migration of surface and shallow subsurface water to the limestone layer, this bedclay "greatly inhibits limestone erosion." This bedclay also supports the looser soils above the bedclay and thus prevents raveling, without which sinkholes cannot form. Two borings--G-11 and F3-1--lacked a layer of Unit 3 or 4 soil above the limestone, but Hanecki concluded that the Unit 2 layers above the limestone at these locations contained sufficient clay or clayey sand to serve the same functions of impeding the downward movement of groundwater and preventing the downward movement of loose soils. This conclusion appears reasonable because Unit 2 is the uppermost reach of the finer- grained materials, of which clays and silts are examples when compared to sands. There is obviously some variability in the distribution of finer- and coarser-grained materials within each occurrence of Unit 2 soils. Hanecki's findings indicated intervals of loose soils, sometimes at depth, which typically would suggest raveling zones. At the proposed location, though, these findings do not support raveling due to the underlying bedclay layer and the history of mining, which probably introduced looser soils typically found closer to the surface through the entire 40-foot depth of the mine cut. Based on these findings, the Hanecki Report concludes that, regardless of at least moderate potential for sinkhole potential in the area, the footprint of the proposed landfill has an acceptably low risk of sinkhole development to permit development of the proposed landfill. This is a reasonable conclusion because it is supported by the data collected by Hanecki and his reasoned analysis of these data. Hanecki's conclusion is also supported by the data and analysis contained in the Golder Report and Ardaman Report, which are based on an additional 84 SPT borings, post- reclamation. Only about 12 percent of these SPT borings reached the limestone, and they cover all of Republic's property, not merely the footprint of the proposed landfill. Even so, these borings confirm two important findings of the Hanecki Report. First, they produced data indicative of an extensive bedclay layer intact on Republic's property. Second, the Ardaman and Golder borings reveal only two or three instances of partial circulation loss that, like the sole occurrence of partial circulation loss in the Hanecki borings, are located on Republic's property, but outside the footprint of the proposed landfill. Republic has provided reasonable assurance that the site will provide an adequate foundation for the proposed landfill and sinkholes are unlikely to undermine the structural integrity of the proposed landfill.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order granting the Construction Permit and Operation Permit, but only if the Operation Permit is modified by the addition of the five items identified in paragraphs 172, 174, 175, 181, and 187. DONE AND ENTERED this 8th day of October, 2010, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of October, 2010. COPIES FURNISHED: Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Tom Beason, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Mimi A. Drew, Secretary Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ronald L. Clark, Esquire Clark, Campbell & Mawhinney, P.A. 500 South Florida Avenue, Suite 800 Lakeland, Florida 33801-5271 William D. Preston, Esquire William D. Preston, P.A. 4832-A Kerry Forest Parkway Tallahassee, Florida 32309-2272 Jennings Kemp Brinson, Esquire Clark, Campbell & Mawhinney, P.A. 500 South Florida Avenue, Suite 800 Lakeland, Florida 33801 Sean R. Parker, Esquire Boswell & Dunlap, LLP 245 North Central Avenue Bartow, Florida 33830-4620 Ralph A. DeMeo, Esquire Hopping, Green, & Sams, P.A. 119 South Monroe Street, Suite 300 Tallahassee, Florida 32301 Stanley M. Warden, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Paula L. Cobb, Esquire Hopping Green & Sams, P.A. Post Office Box 6526 Tallahassee, Florida 32314 John W. Frost, Esquire Frost Sessums Van den Boom & Smith, P.A. Post Office Box 2188 Bartow, Florida 33831 John Stanley Fus Highland Lakes Estates HOA 2190 Boardman Road Bartow, Florida 33830

CFR (4) 40 CFR 25840 CFR 261.2440 CFR 261.4(b)(1)40 CFR 60 Florida Laws (4) 120.569120.57403.703403.707
# 2
FREDERICK A. BRADY AND JANET B. BRADY vs KENNETH ACRE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002608 (1991)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Apr. 25, 1991 Number: 91-002608 Latest Update: Jul. 22, 1992

The Issue The issues are whether the Consent Order entered into between the Department of Environmental Regulation (DER) and Kenneth Acre (Acre) is an appropriate settlement of the violations addressed therein and whether Acre is entitled to construction permit number IC35-190005 for an Industrial Waste Disposal Facility. The Bradys assert that the Consent Order is not a reasonable exercise of DER's enforcement discretion and that the permit should be denied.

Findings Of Fact Background Acre owns and operates an animal research facility in Eustis, Florida. Acre performs research trials on dogs using a USDA approved heartworm medication sold under the brand name of Heartguard, the chemical name of which is ivermectin. Acre is not in the business of testing or manufacturing new drugs. The Consent Order To handle the waste generated by the animals at the facility, Acre initially constructed a conventional septic tank system. Prior to construction, Acre contacted the Lake County health department to inquire about permitting and was told that he did not need a permit for his facility. With that information, he continued with the project. Subsequently, DER became aware of the facility and notified Acre that a DER industrial waste permit was required and that he should cease the discharge into the septic tank until such a permit was obtained. Acre complied with DER's instructions and plugged the septic tanks. Since the time the septic tanks were plugged, the waste has been collected by Roto Rooter on a periodic basis and disposed of offsite. Acre entered into a Consent Order with DER to resolve the alleged past violation for not obtaining a permit and paid of penalty of $600 as required by DER. The Consent Order is a reasonable and appropriate settlement of the violations alleged therein. The Disposal System Acre has applied for a permit to construct and operate an evapotranspiration disposal system to dispose of the waste from his facility on site. The proposed system is essentially a modified septic tank system using a lined drainfield to capture and hold the liquid waste, allowing it to transpire from the grass or otherwise evaporate into the atmosphere and preventing any discharge to groundwater. The waste will be discharged to a series of modified septic tanks which will provide treatment beyond that of a traditional septic tank system and will reduce the amount of total suspended solids. The first septic tank accepts the waste and provides initial treatment through natural settling of solids. The waste then passes through a filter device and travels by gravity flow to the second septic tank. From the second tank it flows through a second filter device and into a dosing tank. The dosing tank is basically a small holding basin with a pump that disperses the waste to the drainfield in incremental amounts. The dosing tank contains several float mechanisms which monitor the level of liquid in the tank. When the water level in the dosing tank reaches a certain level, one such float mechanism turns on the pump to transport the liquid to the drainfield. The waste is then pumped from the dosing tank through a closed pipe to one of two evapotranspiration cells where it is distributed through a number of perforated pipes. The Evapotranspiration Cells The perforated pipes are situated in a gravel bed approximately 24 inches in depth. On top of the gravel bed is a clay soil mix approximately 15 inches deep. The clay soil mix absorbs the liquid waste in the gravel bed by drawing it up through the process of capillarity. Once the liquid is in the upper clay soil layer, it is evaporated. Grass is planted on top of the soil mix as an additional method for dissipation of the waste. The liquid waste is absorbed by the roots of the grass and transpired through the grass leaves. The clay soil mix in the top layer of the system is relatively impervious. The impervious nature of the soil mix along with a three percent surface slope will prevent rain water from entering the evapotranspiration cells and impacting the effective operation of the system. The entire drainfield has a double liner: one PVC plastic liner and a 6" clay layer. These two liners will ensure that no discharge to groundwater will occur from the system. System Capacity It is estimated that the Acre facility will produce approximately 520 gallons per day (GPD) of waste to be handled by the system. The drainfield is designed to handle twice the volume that will be discharged by the Acre facility and is therefore more than adequate to assimilate the waste received into the system. The drainfield is composed of two independent cells so that loading of each cell will be rotated. Once one cell receives its maximum capacity, the loading of that cell will cease in order to allow that cell to assimilate the waste through evapotranspiration. In this manner, the first cell is permitted to "rest" while the second cell receives further loading from the dosing tank. Safety Features Although the proposed disposal system is innovative in design, it incorporates several safety features which will ensure that no overflow of waste will occur. First, a float mechanism in the dosing tank is designed to trigger an alarm in the event the water level in the dosing tank gets too high. If that occurs, the alarm provides a flashing light as well as a horn which will notify the operator of a problem. Once the float reaches this warning level, the system will automatically shut down, thus preventing further waste from entering the system. Second, each evapotranspiration cell is equipped with a similar device which will automatically close off the dosing tanks and prevent further discharge into the cells in the unlikely event the system were to become too saturated to accept further loading. Finally, the double lined drainfield provides an additional safety measure which will prevent any discharge to groundwater. The numerous permit conditions requiring periodic monitoring of water quantity and quality in the system itself as well as the groundwater in the vicinity of the system provide ample assurance that the system will not pose a threat to the state's water resources. Ivermectin Although the proposed system will not discharge to groundwater, DER required the applicant to determine the amount of ivermectin in the wastestream. Ivermectin binds tightly to soil and does not dissolve in water. A sample of the wastestream from the Acre facility was collected by Bionomics Laboratory, Inc., and analyzed by Analytical Development Corporation using the analytical procedure designed by Merck scientists. The results of this analysis show that the concentration of ivermectin in the Acre wastestream ranges from .6 to 6.1 parts per trillion (ppt). The publication submitted to the Department by Acre entitled, Chapter 11, "Environmental Aspects of Ivermectin Usage in Livestock: General Considerations" by Halley, Nessel and Lu, from William C. Campbell, Ivermectin and Abamectin, documents the results of studies designed to determine whether using ivermectin in animals would result in any harmful or undesirable effects on the environment through excretion in the feces. This publication indicates that: Ivermectin is relatively immobile in soil and will not readily translocate into groundwater. Ivermectin is rapidly decomposed by sunlight and therefore will not accumulate in soil when administered to livestock. Ivermectin has no effect on earthworms at a concentration in soil of 12 parts per million (ppm). (This concentration is approximately two million times higher than that of the Acre waste stream.) Aquatic organisms such as water fleas and fish are highly sensitive to ivermectin toxicity. However, ivermectin is not toxic to the most sensitive species, the Daphnia magna, at a concentration of 0.01 parts per billion (ppb). Ivermectin concentrations in cattle feedlot runoff was less than the no-effect level of 0.01 ppb for Daphnia magna and therefore should cause no adverse environmental effects in surface or subsurface waters. The highest concentration of ivermectin found in the Acre waste stream is 6.1 ppt (or .006 ppb), which is less than the 0.01 ppb non-toxic level for the most sensitive aquatic species. Based on the concentration of ivermectin found in the Acre waste stream and the fact that ivermectin binds tightly to soil, the discharge from the Acre facility would not cause any adverse environmental impact, even if it were discharged to groundwater. Bradys' case Bradys submitted no evidence to show that the Consent Order is not an appropriate settlement of the violations alleged therein. They submitted no evidence that the septic tanks were improperly plugged. Brady offered no expert testimony in support of their claim that the facility had caused an adverse impact to groundwater or that the proposed system would cause any threat to groundwater quality. Bradys apparent concern about standing surface water on their property during heavy rainfalls is not relevant to this proceeding. Their concern that the lining of the drainfield could leak is unsupported by competent evidence. Bradys learned immediately prior to hearing that DER had changed its position and intended to issue the permit. Their failure to present any relevant evidence that the Consent Order was insufficient or that the proposed facility would violate any applicable DER rules or criteria and their ill- prepared participation in the hearing was in part the result of DER's late change in position. Bradys' participation in this proceeding was not shown to be frivolous.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Regulation enter a Final Order and therein: Ratify the terms of the Consent Order as reasonable. Grant Acre construction permit number IC35-190005 for an Industrial Waste Disposal Facility, subject to the special conditions set forth in DER Exhibit 1. RECOMMENDED this 22nd day of July, 1992, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of July, 1992. APPENDIX TO RECOMMENDED ORDER CASE NOS. 91-2608, 92-0958 AND 92-0959 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioners, Bradys 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 6 & 7(8) and 15(10). 2. Proposed findings of fact 1-5, 16, 27, 28, 31, 36-42, 44, 46-49, 51, 52, 54, 57-59, 61, and 62 are subordinate to the facts actually found in the Recommended Order. 3. Proposed findings of fact 8, 10-14, 17, 19-21, 26, 29, 30, 32, 33, 35, 43, 53, 55, and 56 are irrelevant. Proposed findings of fact 9, 18, 22-25, 45, and 50 are unnecessary. Proposed findings of fact 34 and 60 are unsupported by the competent and substantial evidence. Specific Rulings on Proposed Findings of Fact Submitted by Respondents, Acre and DER Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-44(1-44). Proposed findings of fact 45 and 46 are unsupported by the competent and substantial evidence. COPIES FURNISHED: Carlyn H. Kowalsky, Attorney at Law Bogin, Munns & Munns 250 North Orange Avenue 11th Floor-P.O. Box 2807 Orlando, FL 32802 Douglas MacLaughlin, Attorney at Law Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Martha Hunter Formella Attorney at Law FOLEY & LARDNER Post Office Box 2193 Orlando, FL 32802-2193 Carol Browner, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (3) 120.57403.087403.412
# 3
DEPARTMENT OF ENVIRONMENTAL PROTECTION vs NEMI, INC., 09-000941EF (2009)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Feb. 18, 2009 Number: 09-000941EF Latest Update: Dec. 02, 2009

The Issue The issues in this case are whether Respondent, Nemi, Inc., should pay a $500.00 administrative fine for maintaining an unpermitted stationary installation that is reasonably expected to be a source of water pollution (Count I); whether it should pay an administrative fine of $9,500.00 for failing to submit a completed Site Assessment Report (SAR) within 270 days of discovery of the discharge of chemical solvents (Count II); whether it should pay investigative costs and expenses in the amount of $1,500.00 incurred by Respondent, Department of Environmental Protection (Department) (Count III); and whether it should take corrective action, as described in the Department's Notice of Violation, Orders for Corrective Action, and Administrative Penalty Assessment (Notice of Violation) issued on January 23, 2009.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Respondent is a for-profit corporation registered to do business in the State. Respondent's president and registered agent is Neil Schuberg, who represented the corporation at hearing. Respondent is the owner of a 1.1-acre parcel of real property located at 6801 Northwest 17th Avenue, Fort Lauderdale, Florida. The property is situated in what is known as the Gateway Industrial Center just south of the City of Pompano Beach and midway between the Florida Turnpike and Interstate 95. The parcel is rectangular shaped and is approximately 90 feet wide by 180 feet long. The property is further identified by the Broward County Property Appraiser as Parcel Identification Number 494209050040. A one-story warehouse and parking lot are located on the property, which is currently leased by Respondent to a testing laboratory. The evidence shows that for at least since 1981 David R. Ligh owned the property until his death. After he died, his widow, Elsie M. Ligh, sold the property in 1994 to Clayton John Pierce subject to a mortgage in the amount of $167,640.00. Mr. Pierce began operating a business on the premises known as Combined Roof Services, Inc. In 1995, Mr. Pierce decided to sell the property. A potential buyer, S & S Propeller Company, retained the services of Buck Eco-Logic, Inc., an environmental consulting firm, to prepare an environmental site assessment for the purpose of "determining the suitability of property for ownership by [S & S Propeller Company]." When it first inspected the site in July 1995, Buck Eco-Logic, Inc., discovered three thirty-five gallon drums and a twenty-gallon black plastic tub, all labeled "hazardous waste" and reflecting that they had contained tetrachloroethene (also known as perchloroethylene) waste. This is a chemical solvent that is typically used by dry cleaning establishments. The labels carried the name and "EPA ID number" of Family Dry Cleaners located at 6804 Stirling Road, Davie, Florida, an address which appears to be around ten to twelve miles south of the subject property. The three drums were lying on their sides on the northern end of an asphalt parking area beneath overgrown Brazilian pepper trees and were empty; the empty twenty-gallon tub was located inside the building on the property. Soil borings on the property performed by Buck Eco- Logic, Inc., revealed concentrations of tetrachloroethene at 10,613 parts per billion, which exceed allowable standards. Tetrachloroethene and its breakdown products are a solid waste, as defined by Florida Administrative Code Rule 62-701.200(113). A Phase I Environmental Site Assessment (Phase I ESA) dated August 13, 1995, was prepared by the consulting firm and sets forth in detail the results of its inspection. See Department Exhibit 2. The sale was never consummated. Later that year, Mr. Pierce engaged the same consulting firm to perform a Phase II Environmental Site Assessment of the property. That assessment revealed concentrations in groundwater ranging from 8,840 parts per billion to 173,000 parts per billion of tetrachloroethene, which exceed the State Clean Soil Criteria and State Maximum Contaminant Levels. The report, issued on October 13, 1995, was received in evidence as Department Exhibit 3. On October 30, 1995, a Mr. Pivnick, an attorney with the firm of Dombroff & Gilmore, P.A., which represented Mr. Pierce, notified the Department by letter that the empty drums and tub had been discovered on the property. The letter also attached a copy of the Phase I ESA. Mr. Pivnick was instructed by the Department to contact the local police department to report the incident as well as the state warning system for reporting discharges to the environment. Also, the Department contacted other local agencies and the United States Environmental Protection Agency (EPA). In October 1995, Mr. Pierce vacated the premises and ceased operating Combined Roof Services, Inc. In January 1996, he began leasing the property to Sun Valley Industries, also a roofing repair business, until that firm vacated the premises in December 1997. With the use of grant monies, the Department engaged the services of International Technology Corporation to prepare a Preliminary Investigation Report (PIR) for the property. That report was issued on February 13, 1997. See Department Exhibit The PIR recommended that additional monitoring of the site (through shallow monitoring wells, soil samples, groundwater samples, and groundwater flow direction) be made to quantify the presence of chlorinated solvents. Again with the use of grant monies, in 1997 the Department engaged the services of Post, Buckley, Schuh & Jernigan, Inc., to prepare a Site Inspection Report (Report) for the subject property. The Report was issued in March 1998. See Department Exhibit 5. Excessive tetrachloroethene, Cis-1, 2- dichloroethene, and trichloroethylene were detected in ground water samples, while tetrachloroethene was detected in all seven soil samples. On April 2, 1998, Ms. Ligh assigned the mortgage on the property to Nemi, Inc., for around $100,000.00. Mr. Schuberg explained that he was able to purchase it at a discount because Mr. Pierce had ceased making payments on the mortgage and had warned Ms. Ligh that if she foreclosed on the mortgage, she would be responsible for cleanup costs on the property exceeding a million dollars. While Mr. Schuberg acknowledged that he was aware of a contamination problem on the property, he says the mortgage was purchased as an investment, and he never thought he would actually acquire the property because he believed Mr. Pierce would continue to make the mortgage payments. After failing to make payments on the mortgage, on September 21, 1999, Mr. Pierce executed a Warranty Deed in Lieu of Foreclosure in favor of Nemi, Inc. Based on conversations with Mr. Pierce at that time, Mr. Schuberg says he was under the impression that the spill was much smaller than it actually was, and that it would be cleaned up by the Department. At hearing, Mr. Schuberg characterized Mr. Pierce as "a hustler and a liar." After Mr. Pivnick's report of contamination was received, the Department, along with the Broward County Department of Natural Resource Protection, initiated an investigation (probably in late 1995 or early 1996) in an attempt to verify the source of the contamination. Because Family Dry Cleaners "was on the top of [its] list," the Department first sought to determine whether that firm had actually deposited the drums and tub on the subject property. It learned that in 1994, or a year before the contamination was reported to the Department, Family Dry Cleaners had been evicted by its landlord, Lincoln Park. According to the Department, this "led to a dead- end" as far as Family Dry Cleaners was concerned. However, that business had been replaced by another tenant, Liberty Dry Cleaners. The Department then attempted to ascertain whether Lincoln Park or the new tenant might have been responsible for transporting the drums and tub to the subject property and dumping the waste. However, the Department was unable to confirm that either of the two had done so. Photographs of the drums and tub were made by Buck Eco- Logic, Inc., when it conducted an assessment in July 1995. Because the empty drums and tub were later removed from the site by unknown persons, the Department was only able to review the photographs when it conducted its investigation. Photographs of the drums indicated that they were larger than the twenty-gallon drums normally used by a dry cleaning establishment, and the labels on the drums were not perforated or dot matrix, which are more typical of those used by dry cleaners. For this reason, and because the empty tub was found inside the building on the property, the Department attempted to determine if Mr. Pierce had purchased the contaminants for use in his operations; it was not able to confirm this fact. The Department also contacted local law enforcement officials to see whether a criminal investigation could be launched. As noted above, however, the drums and tub had been removed by unknown persons while Mr. Pierce still had possession of the property and there was no forensic evidence for law enforcement officials to examine. The result of the investigation was that the Department was unable to determine who deposited the drums on the site or the exact location where the contents were first dumped. Although Respondent contended that the Department could have easily determined who removed the empty drums and tub from the subject property by examining the manifests of the carriers who engage in that type of business, the Department investigator did not attempt to do this since the yellow pages in the telephone directory reflected at least six pages of transporters in this type of business. Further, there is no evidence that a commercial transporter was even involved. For all of these reasons, the Department looked to the current owner of the property, Respondent, as the entity responsible for site rehabilitation since there were, and still are, contaminants leaching into the groundwater and aquifer system. Specifically, as of 2007, or twelve years after the discharge occurred, the groundwater on Respondent's property was still contaminated with tetrachloroethene, trichloroethylene, and cis-1, 2-dichloroethene exceeding the Department's groundwater standards. Also, the same contaminants exceeded the Department's soil cleanup target levels based on ground water criteria. Because rainfall and surface water continue to come into contact with the contaminated soil, and there is no liner or impervious cap in place, the installation is reasonably expected to be a source of water pollution. On September 12, 2001, the Department sent a letter by certified mail to Respondent advising that contamination was present on the property, that there were "possible violations of law for which you may be responsible," and that a Preliminary Contamination Assessment (PCA) must be filed within sixty days from the date of the letter. See Department Exhibit 6. Although a meeting of the parties was held on October 4, 2001, a PCA was never filed. 16. On April 27, 2006, March 12, 2007, and July 3, 2007, the Department issued Warning Letters to Respondent advising that an enforcement action would be initiated unless Respondent provided a SAR within a time certain. See Department Exhibits 7, 8, and 9. (The record is silent as to why no formal activity occurred between October 2001 and April 2006.) Exhibit 8 reflects that on November 21, 2006, "analysis results of sampling of one monitoring well were received by the Department." A meeting was later conducted by the parties on January 16, 2007, at which time Respondent agreed to "draft a suitable letter of [its] intentions with regard to conducting the required assessment and send it to the Department on or before January 31, 2007." There is no record of such a letter being sent. In August 2007, Respondent contracted with Florida Environmental Engineering, Inc., to perform a "limited site assessment report." In March 2008, that firm submitted to the Department a Preliminary Site Assessment Report (PSAR) See Department Exhibit 10. For this service, Respondent paid around $16,000.00. On March 21, 2008, the Department advised Respondent by letter that the PSAR was incomplete and that further information should be provided by April 30, 2008. See Department Exhibit 11. An Addendum to the PSAR was provided on May 5, 2008. See Department Exhibit 12. This report cost Respondent an additional $3,000.00. The PSAR indicated that contaminants (dichloroethene and trichloroethylene) in the water and soil on the property exceeded Department groundwater and soil cleanup target standards and levels. The report concluded, however, that "the discharge to the site is from an offsite source" (west of the property) and that "the property owner is no longer a responsible party." On August 27 and then again on October 22, 2008, the Department issued letters to Respondent advising that "there is not enough data to support the assumption that the discharge is offsite and the contamination is from an offsite source located west of the property." The Department reached this conclusion because, among other reasons, "[t]he contamination does not seem to be delineated towards the northern and southern portions of the site," "[t]here are no horizontal delineation wells to [the] north," the "iso contour maps provided appear to show the vertical delineation of the contamination but not horizontal delineation [of the plume]," "additional monitoring points need to be [added]," and "the onsite monitoring well, MW-2, shows a very high concentration of Perchloroethylene (PCE) at 81,000 ug/L [microgram per liter] and other contaminants, while the MW-1 does not exhibit groundwater contamination to that extent." See Department Exhibits 14 and 15. In plainer language, Respondent's report was deficient in that all contamination sources were not identified; it failed to delineate the horizontal and vertical extent of soil and groundwater contamination; and it failed to recommend a remedial action to clean up the contamination. The two letters advised that the site assessment was incomplete and that additional information described in the letters must be submitted by November 14, 2008. To date, Respondent has failed to submit the required information. According to Mr. Schuberg, to perform a study that would supply the additional information requested by the Department would cost him around $100,000.00, an amount he is unwilling to pay. More than 270 days has expired since a discharge was discovered on Respondent's property, and it has failed to submit a complete SAR, as described in Florida Administrative Code Rule 62-780.600(8). See also Table A, Fla. Admin. Code R. Ch. 62-780, which prescribes the specific time frame (within 270 days after the discharge is discovered) for submitting this report. The Department has incurred expenses in the amount of $1,500.00 while investigating this matter. See Department Exhibit 17. This amount is not disputed. As corrective action, the Department requests that within ninety days of the effective date of this Final Order, Respondent submit a complete SAR which addresses the deficiencies specified in the Department's August 27, 2008, letter. See Department Exhibit 14. To complete the SAR, additional soil and groundwater samples need to be collected to determine the vertical and horizontal extent of contamination, all source areas must be identified, and a remedial action must be developed to abate the contamination. Finally, the contaminated soil must be removed from the property so that it will no longer discharge into the groundwater. The Notice of Violation requests that upon approval of the SAR, Respondent "shall commence and complete in a timely fashion all further tasks" required by Florida Administrative Code Rule Chapter 62-780. These corrective actions are reasonable and are hereby approved. In calculating the penalty, Respondent has assessed a $500.00 administrative penalty for Respondent maintaining a stationary installation that is reasonably expected to be a source of water pollution without a permit. This is based upon a violation of Section 403.121(5), Florida Statutes, which makes it unlawful to not comply with a regulatory statute's requirement. Under Section 403.121(6), Florida Statutes, the Department has also assessed a $500.00 per day penalty against Respondent for failing to file a SAR for nineteen days, for a total of $9,500.00. When added to the $500.00 previously assessed, the total administrative penalty is $10,000.00, which is the maximum allowed in this type of proceeding. See § 403.121(2)(a), Fla. Stat. Throughout this process, Mr. Schuberg has contended that the responsibility for cleanup lies with the person or entity actually responsible for placing the drums and tub on the property in 1995. He says that the evidence clearly shows that Family Dry Cleaners is the responsible party. However, the Department and local authorities were never able to confirm who actually dumped the waste on the subject property. Although Mr. Schuberg says it will take "[i]n the hundreds of thousands of dollars" to clean up the site, the evidence shows that when he purchased the mortgage in 1998 and assumed ownership in 1999, he knew the property was contaminated. Mr. Schuberg further stated that because his consultant could never get "answers" from the Department, the consultant was instructed to stop work. However, Mr. Schuberg never contacted the Department to get clarification about what was required. At hearing, Mr. Schuberg also offered a lay opinion that his consultant's report filed in March 2008 proves that in 1995 the contents of the drums and tub were dumped on an offsite asphalt road adjacent to the property, surface water runoff then carried the chemical solvents onto his property, and the empty drums and tub were left in the parking lot. The Department's expert did not agree with this supposition, and there is no expert testimony to confirm the accuracy of this theory. Respondent has also contended that the property should be cleaned up with state funds. As pointed out by a Department witness, however, one problem is that the property does not meet the definition of a dry cleaner and thus cannot qualify for funds under that program. Then, too, a state-funded cleanup is a last resort which is used only after the Department has exhausted all enforcement remedies. Also, in this era of tight budgets, the Department has a finite amount of funds to use for this purpose, and is limited to cleaning up only a few sites per year. Finally, the responsible party must first acknowledge by affidavit that it lacks the necessary resources to clean up the property before the Department "may" seek cleanup funds. Respondent has not yet filed such an affidavit or admitted liability. In terms of mitigating evidence, Mr. Schuberg conceded that he has not done "a whole lot" to address the contamination problem since acquiring the property in 1999. In 2008, he did expend around $20,000.00 in having a PSAR and Addendum prepared for the Department. In all other respects, he steadfastly refuses to spend any more money on assessments or take responsibility for the cleanup since he believes that Family Dry Cleaners is the entity responsible for site rehabilitation.

Florida Laws (8) 120.569120.68403.031403.087403.121403.16157.04157.071 Florida Administrative Code (3) 62-520.20062-701.20062-780.600
# 4
HY KOM DEVELOPMENT COMPANY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-002957 (1989)
Division of Administrative Hearings, Florida Number: 89-002957 Latest Update: Oct. 12, 1992

Findings Of Fact On or about December 28, 1987 Hy Kom filed with the Department an application for a permit to construct a .0126 MGD Advanced Waste Water Treatment Plant on Emerson Point, Snead Island in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Terra Ceia Bay in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Tampa Bay in Manatee County. The proposed waste water treatment plant would discharge effluent into the waters of Manatee River in Manatee County. The waters of Terra Ceia Bay have been designated Outstanding Florida Waters (OFW) by the Department. On or about April 27, 1989 the Department issued a Notice of Permit Denial concerning Hy Kom's permit application. The parties stipulate the Intervenor, Manasota-88, has standing to intervene as a party Respondent and to object to the issuance of the permit. Petitioner's evidence can best be summarized by what was not submitted. First, the expert witness called to identify the application had not prepared any part of the application or verified any of the studies presented therein. Similarly Petitioner's expert on the proposed treatment plant did not testify that Petitioner was committed to using this plant, or that the construction of the plant and the operation of the plant would comply with statutory and rule requirements. The only witness called by Petitioner to testify to the effect the discharge from the proposed advanced waste water treatment plant would have on the receiving waters was also Respondent's expert; and this witness testified that the effluent discharge from this proposed plant would have an adverse effect on the receiving waters, would seriously degrade the receiving waters as a nursery habitat for both crustacea and fishes endemic to the area, and that no reasonable assurances that this would not happen were ever presented by the Petitioner. This witness further testified that no discharge into these receiving waters would be acceptable not only because of the nitrogen level (which was the most significant reason for denying the permit) but also because even a discharge of absolutely pure water would upset the salinity of the receiving waters at the critical time the receiving waters act as a marine nursery.

Recommendation It is RECOMMENDED that a Final Order be entered denying the application of Hy Kom Development Company, for a permit to construct and operate an advanced waste water treatment facility at Emerson Point, Snead Island, Manatee County, Florida. DONE and ORDERED this _15th_ day of September, 1992 in Tallahassee, Leon County, Florida. COPIES FURNISHED: JAMES W. STARNS ESQ 501 GOODLETTE RD SUITE D-100-24 NAPLES FL 33940 W DOUGLAS BEASON ESQ ASST GENERAL COUNSEL K. N. AYERS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this _15th_ day of September, 1992. DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400 THOMAS W REESE ESQ 123 EIGHTH ST N ST PETERSBURG FL 33701 DANIEL H THOMPSON ESQ GENERAL COUNSEL DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400 CAROL BROWNER SECRETARY DEPT OF ENVIRONMENTAL REGULATION 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400

Florida Laws (1) 403.086
# 5
DEPARTMENT OF ENVIRONMENTAL PROTECTION vs MR. ENOS KERR AND CUSTOM CARE DRY CLEANING, INC., 07-003702EF (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 20, 2007 Number: 07-003702EF Latest Update: Jul. 08, 2019

The Issue The issues in this case are whether the Respondents, Enos Kerr and Custom Care Dry Cleaning, Inc., are guilty of the violations alleged in, should take the corrective actions described in, and should pay the penalties assessed in the Notice of Violation, Orders for Corrective Action, and Administrative Penalty Assessment, DEP OGC File No. 06-2382-37-HW (the NOV).

Findings Of Fact Enos Kerr is the President and manager and an owner of Custom Care Dry Cleaning, Inc., a dry-cleaning business located in Tallahassee, Florida. The Respondents have been in business for approximately twenty-five years. For approximately ten years, Custom Care has used Vista LPA-142 as a dry-cleaning solvent. Custom Care uses a spotting agent known as "Picrin" for removal of difficult stains. Vista LPA-142 is also known as paraffinic, napthenic solvent, and aliphatic solvent. It contains 100 percent paraffinic or napthenic solvent. It looks like water but is a white oily liquid that has the odor of hydrocarbon and is a kind of "mineral spirits." "Picrin" contains more than 98 percent chlorinated hydrocarbon. It is listed at 40 Code of Federal Regulations (CFR) § 372.65 and exceeds the de minimis concentration defined in 40 CFR § 372.38. On August 18, 2006, John Johnson, a DEP Environmental Specialist, inspected the premises of Custom Care. He found two partially full 55-gallon steel drums of Vista LPA-142 outside of secondary containment, which contained a 110-gallon storage tank and Custom Care's Midwest dry-cleaning machine (which has a base tank that stores used Vista LPA-142 which has passed through a Filter King purification system for reuse in the dry-cleaning machine). He testified that, not only did Mr. Kerr tell him the drums were full or partially full, they were heavy enough from being full or partially full that Mr. Johnson could not move them easily. On August 18, 2006, Mr. Johnson also observed, hanging on the outside of the wall of the secondary containment area, above the 55-gallon drums, some of the clear plastic tubing, a pump, and a PVC pipe extending from the end of the tubing, which were used to transfer Vista LPA-142 from the 55-gallon drums into the 110-gallon storage tanks. The floor beneath the transfer equipment and the 55-gallon drums was not sealed or otherwise treated to render it impervious. In another part of the premises on that date, also outside secondary containment, was a Forenta spotting board used for removal of difficult stains from fabric before placement in the dry-cleaning machine. Various chemicals, including a plastic bottle containing "Picrin," were in a box or tray attached to the spotting board. Beneath the spotting board was an open plastic waste basket used to collect and contain spotting agent suctioned from the item of clothing being cleaned and funneled to the basket. The floor under the spotting board was not sealed. Custom Care's Filter King purification system uses cloth filters. Periodically, Custom Care replaces the filters containing lint from the dry-cleaning process. The old filters are allowed to air-dry in the secondary containment area before disposal in the municipal solid waste dumpster outside the premises. At the end of Custom Care's dry-cleaning process, the dry-cleaned clothes are wrung out during a mechanical spinning cycle and then manually transferred while still damp or somewhat wet to a Huebsch dryer, which is outside secondary containment and on a floor that was not sealed on August 18, 2006. Air- drying is the last step in the process. DEP did not have the filters and lint analyzed to prove that they were contaminated with Picrin or any other hazardous substance. Instead, DEP assumed that there was some contamination, however small, and relied on the federal "mixture" rule that even the smallest amount of hazardous waste contamination turns previously unregulated solid waste into regulated hazardous waste. Count I - Secondary Containment Respondents' factual defenses to Count I, for not having the Vista LPA-142 in secondary containment on August 18, 2006, are: (1) secondary containment was not required because Vista LPA-142 is not a "dry-cleaning solvent"; and (2) if secondary containment was required, all of the Vista LPA-142 was in secondary containment because the 55-gallon drums and transfer equipment were empty. In support of their first defense to Count I, Respondents maintain that Vista LPA-142 is an aqueous solvent because an analysis of a sample from the base tank that collects used Vista LPA-142 after use and filtration for reuse in the dry- cleaning machine indicates the presence of 0.34 percent water. However, the presence of that small amount of water in the sample did not prove that Vista LPA-142 is an aqueous solvent. Custom Care also contends that Vista LPA-142 is not a "dry-cleaning solvent" because Custom Care buys it from Phenix Supply Company, which not only sells product to dry-cleaners but also sells to other businesses for other uses, making Phenix Supply something other than a "wholesale supply facility." This contention is rejected. See Conclusion 33, infra. Also in support of their first defense to Count I, Respondents pointed to information received from the producer of Vista LPA-142 that it was biodegradable to carbon dioxide and water. However, biodegradation would occur only in the presence of water and naturally-occurring microorganisms and aerobic conditions. Such biodegradation does not mean that Vista LPA-142 is an aqueous-based solvent and not a naphthenic, petroleum- based, dry-cleaning solvent. Respondents also believed Vista LPA-142 was not a petroleum-based dry-cleaning solvent because it has a flashpoint above 140 degrees Fahrenheit. But there was no evidence to prove that having a flashpoint above 140 degrees Fahrenheit means that the Vista LPA-142 is an aqueous-based solvent and not a naphthenic, petroleum-based, dry-cleaning solvent. In support of their second defense to Count I, Mr. Kerr denies telling Mr. Johnson the 55-gallon drums were full or partially full and maintains that the presence of a bung wrench on one of the drums was a fail-safe sign that both were empty (and, essentially, proved that Mr. Johnson was lying). Supposedly, according to Respondents, the Vista LPA-142 always is transferred immediately upon delivery from the 55-gallon drums into the 110-gallon tank and, sometimes, also into the base tank, and that the bung wrench is placed on one of the empty drums as a signal to the supplier that the drums are empty and ready to be removed when the supplier returns in two weeks to check on the drums to see if they are empty and ready to be picked up. This explanation is not logical. To the contrary, the use of the bung-wrench signal tends to prove the opposite--i.e., that the drums were not empty. If the Vista LPA-142 always is immediately transferred in its entirety, there would be need for a bung- wrench signal. Indeed, the Vista LPA-142 could be immediately transferred by the supplier (or by the Respondents while the supplier was still on the premises). In addition, Mr. Kerr conceded that there have been many other occasions when the 55- gallon drums were not completely transferred into the 110-gallon storage tank immediately upon delivery. There also have been occasions when three 55-gallon drums have been delivered by the supplier, all of which would not fit into the 110-gallon reserve tank and the base tank. In addition, during an enforcement meeting on September 13, 2006, to discuss a draft Hazardous Waste Inspection Report, while noting other issues with findings in the report, Mr. Kerr did not take issue with findings concerning the 55- gallon drums. Also in support of their second defense to Count I, Respondents maintain that the transfer equipment is emptied of all Vista LPA-142 before it is re-hung on the wall. This can indeed be accomplished by quickly extracting the PVC extension from the drum, reversing its orientation by 180 degrees so that it point toward the ceiling, and continuing to run the pump until the tubing is empty. In any event, while stains on the concrete floor under where the PVC pipe is hung on the wall may be from Vista LPA-142, which would suggest that the procedure is not always followed to perfection, the NOV did not cite Respondents having the transfer equipment outside of secondary containment. Count II - Unsealed Flooring Respondents' factual defense to Count II, for not having the flooring sealed between the secondary containment area where the dry-cleaning machine was and where the Huebsch dryer was, or where the 55-gallon drums were, is that secondary containment was not required because Vista LPA-142 is not a "dry- cleaning solvent." Factually, that defense already has been addressed in Findings 11-14, supra. Count III - Disposal of Solid Waste Respondents' factual defenses to Count III, for unpermitted and unauthorized disposal of solid waste (i.e., the filters and lint) on August 18, 2006, are: (1) that disposal of the filters and lint in the municipal solid waste dumpster is permitted and authorized because they are not hazardous waste; and (2) that, if they were hazardous waste, they were hazardous due to contamination with Picrin, not with tetrachloroethylene, also known as perchloroethylene or "perc," as alleged in the NOV. In support of their first defense to Count III, Respondents contend that all Picrin used in spot removal would be suctioned out of the item of clothing and collected in the container below the spotting board, or would be evaporated by the steam used in the spot removal process. Indeed, Picrin's boiling point is 165 degrees Fahrenheit, which is lower than the temperature of steam. Respondents contend, as proof of their first defense, that if any trace of Picrin remained on clothing after spot removal, it would be diluted in the Vista LPA-142 used in the dry-cleaning process and then returned to the base tank for reuse after the clothes are wrung out, but that a laboratory analysis of a sample of from the base tank did not indicate the presence of anything but water. However, actually the analysis was only performed to detect the presence of water; the sample was not analyzed for the presence of Picrin, or any of its breakdown products, or anything other than water. There may be traces of Picrin in the contents of the dry-cleaning machine's reservoir. Besides, even if there is no Picrin in the dry-cleaning machine's base tank, that evidence would not preclude the possibility that Picrin is filtered out by the Filter King purification process and is present in the filters and lint. Regardless, while the first defense to Count III was not proven, DEP presented no evidence on the question whether it is likely the filters and lint would be contaminated with Picrin. Rather, DEP's evidence assumed contamination without any further proof. As to Respondents' second defense to Count III, the NOV does in fact reference tetrachloroethylene, also known as perchloroethylene or "perc." However, it also calls the chemical "Picrin ® which contains 100% Tetrachloroethylene ('Perc')." The confusion arose because, during his inspection, Mr. Johnson obtained from Custom Care's files a Material Safety Data Sheet (MSDS) for Picrin. When he consulted with the manufacturer, he was told that the MSDS was out-of-date, and the manufacturer provided him with the current MSDS for Picrin. Then, the draft Hazardous Waste Inspection Report discussed during the enforcement meeting on September 13, 2006, referred to "today's Picrin [which] contains 100% Trichloroethylene ('Perc')." Mr. Kerr pointed out that "perc" was tetrachloroethylene, not trichloroethylene. From this, Mr. Johnson and Mr. Byer understood Mr. Kerr to be admitting to the use of "perc," which he was not. In an attempt to correct the report in accordance with Mr. Kerr's comment, DEP modified the report so that the final draft referred to: "today's Picrin [which] contains 100% Tetrachloroethylene ('Perc')." Even if the NOV is not defective in referring to "Perc" instead of clearly stating that Picrin was the alleged hazardous waste involved, DEP failed to prove that Picrin was mixed with the filters and lint. For that reason, DEP did not prove the allegations in Count III. Count IV - Investigative Costs The Department's proof of investigative expenses incurred consisted of the salary compensation paid to its investigators. Mr. Johnson’s salary is $17.53 per hour. He spent approximately 55 hours conducting inspections and investigating this case, which totals $964.15. Mr. Byer’s salary is $22.87 per hour. He spent approximately 96 hours investigating this case, which totals $2,195.52. Corrective Actions Upon re-inspection of the premises on November 8, 2006, Respondents were in compliance with all requirements. Deliveries of Vista LPA-142 were being transferred into the 110-gallon storage tank and base tank by the supplier upon delivery, and Respondents had sealed the flooring appropriately. It is not clear from the evidence what was being done with the filters and lint, but apparently they were being appropriately disposed of as hazardous waste at the time of the follow-up inspection. Other Mitigating Circumstances The evidence reflects a misunderstanding on the part of Respondents that, because Custom Care uses Vista LPA-142 and is considered a "mineral spirits" dry-cleaner, as opposed to a "perc" dry-cleaner that uses "perc" or some other form of chlorinated hydrocarbon that is a hazardous material in its dry- cleaning machine, it is not governed by dry-cleaning statutes and regulations.

CFR (1) 40 CFR 372.38 Florida Laws (6) 120.68376.301376.3078403.121403.141403.1651 Florida Administrative Code (1) 62-701.300
# 6
SON-MAR SOUTH SANITATION, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 94-005488BID (1994)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Oct. 05, 1994 Number: 94-005488BID Latest Update: Jul. 05, 1995

Findings Of Fact On November 16, 1988, Industrial Waste Service, Inc. (IWS), obtained approval to provide garbage and trash collection services to the City of Pembroke Pines (City) when the City passed and adopted Resolution No. 1876 approving the assignment of the contract for such services between the City and Citywide Sanitation Company, Inc. (Citywide), to IWS. Citywide's contract was to expire June 30, 1993. On November 6, 1991, the city amended Chapter 112 of its Code and passed and adopted a solid waste franchise ordinance, called the "City Solid Waste Franchise Ordinance," Ordinance No. 975, effective November 6, 1991. The Ordinance provides in pertinent part: Sec. 112.39 FRANCHISE REQUIRED TO OPERATE; RESTRICTIONS ON OPERATING IN THE CITY; AWARD OF FRANCHISE It shall be unlawful to commence or engage in the business of collecting and disposing of solid waste originating in the city without a franchise issued by the franchising authority in accordance with the provisions of this subchapter. It shall be unlawful for any hauler operating in the city to dispose of solid waste collected in the city at any location other than to the Resource Recovery System transfer station or facilities designated in the plan of operation under the Solid Waste Disposal Agreement, as defined in section 94.22 of the code, the City's Flow Control Ordinance. (Underscore and strike through omitted) On February 13, 1992, the City and IWS entered into a "Solid Waste Collection & Disposal Agreement" (Agreement). The Agreement provides in pertinent part: 2. DEFINITIONS Contract Collection Area shall include all of the City of Pembroke Pines, Florida, as the boundaries of said City shall exist at all times during the life of this Contract. * * * 4. TERM & EFFECTIVE DATE The term of this Contract shall be for a five (5) year period beginning February 1. 1992 and termi- nating January 31, 1997. This Agreement shall become effective upon execution by the parties hereto. On April 1, 1992, the Agreement was amended, "First Amendment to Solid Waste Collection & Disposal," which provides in pertinent part. DEFINITIONS * * * Commercial Service shall mean the collection and disposal of Garbage, trash, Solid Waste and Processable Waste for all Business, Commercial, Industrial, hospital, school, governmental and quasi-governmental establishments, including the collection and disposal of Construction and Demolition Debris. * * * Processable Waste shall mean that portion of Waste Stream that is capable of being processed in the Corporation's resource recovery and compost facility, including but not limited to materials which are recyclable and all acceptable Waste other than Non- Processable Waste (as defined herein). * * * Solid Waste shall mean all waste accumulations consisting of garbage, residential/household trash, commercial/business trash and construction and demolition debris, including but limited to all materials which are recyclable. * * * CONTRACTOR'S RIGHTS (D) The City further grants to Contractor the exclusive right to service all Residential Curbside, Apartment, Condominium, Business, Industrial, and Commercial establishments that are certified for occupancy after February 1, 1992, provided, however, a certificate of occupancy issued as a result of remodeling with no change in ownership shall not require the owner to change service to the Contractor except for the Solid Waste (i.e. Construction Demolition and Debris) created thereby. * * * The City grants to the Contractor the exclusive right to provide Solid Waste collection and disposal services to any Residential Apartment, Business, Commercial or Industrial establishments for the following customers as of February 1, 1992: For CONTRACTORS's existing customers; and For customers that have a change in ownership after the City's approval of the Agreement; and For customers which received Solid Waste collection and disposal services in the City prior to the City's approval of the Agreement and whose contract for such services expires and is not renewed with the same provider in the future. (Underscore and strike through omitted) On November 4, 1992, the City passed and adopted an ordinance, Ordinance No. 1016, amending Chapter 94 of its Code providing for a new subchapter entitled "Garbage Collection" and providing new sections. The Ordinance provides in pertinent part: Sec. 94-10 Agreement with Private Collector. The City acting by and through its City Commission, and in accordance with the provisions of Section 112.37 through 112.41 of the Code, approved a Solid Waste Collection & Disposal Franchise Agreement dated January 15, 1992, as amended by the First Amendment dated April 1, 1992 ("Agreement") between the City and Industrial Waste Service Inc. ("Collector"). All providers of Solid Waste collection and disposal services other than Collector who provide such services within the City boundaries shall be referred to herein as "Haulers". All terms not otherwise defined in this Subchapter shall have the meaning ascribed thereto in the Agreement. The Agreement is specifically made a part hereof as Appendix A, and a copy of same will be maintained at the City Clerk's Office at City Hall. Pursuant to the Agreement the City has granted the Collector the following rights and obligations to provide Solid Waste collection and disposal services: * * * The exclusive right and obligation to provide solid waste collection and disposal services within the City boundaries, present and future, for all Residential Curbside, and all Apartment, Condominium, Business, Industrial and Commercial establishments that are certified for occupancy after February 1, 1992, and govern- mental establishments to the extent permitted by law, provided, however, that a certificate of occupancy issued as a result of remodeling with no change in ownership of the property shall not require the Customer to change to Collector except for construction/remodeling demolition and debris created thereby; and The exclusive right and obligation to provide solid waste collection and disposal services within the City boundaries for all construction or remodeling demolition and debris within the City; and As of February 1, 1992, the exclusive right and obligation to provide solid waste collection and disposal services within the City boundaries for; [sic] Collector's existing Customers; Customers/property owners in the City that have a change in ownership; and customers/property owners whose contract for solid waste collection and disposal services expires and is not renewed with the same provider. Sec. 94.14 Certain Acts Prohibited. * * * (C) It shall be a violation of this subchapter for any person, firm, corporation or other entity, other than Collector to collect and/or dispose of Solid Waste originating in the City except to the extent the same is specifically permitted by the terms of this subchapter. (Underscore and strike through omitted) By letter dated June 10, 1992, IWS notified South Florida State Hospital that it (IWS) was the exclusive contractor for solid waste collection and disposal. South Florida State Hospital (Hospital) is a state mental health treatment facility operated and administered by the Division of Health and Rehabilitative Services (HRS) pursuant to Chapter 394, Florida Statutes. The Hospital is located on state property and is situated within the city limits of the City of Pembroke Pines (City), Broward County, Florida. In December 1993, HRS published an Invitation To Bid (ITB) on Bid # 595-591 for waste disposal services at the Hospital. Browning Ferris Industries, IWS, and Southern Sanitation Service submitted bids. On December 8, 1993, a pre-bid conference was held which included an opportunity for questions and answers. At this conference, HRS pointed out, among other things, that the City had an exclusive contract with IWS for waste disposal services but it (HRS) was also obligated by Florida Statutes to ensure the bidding remained competitive and that all waste collected from the Hospital had to be deposited at land fill sights designated by the City. In or around January 1994, HRS notified the bidders of Bid # 595-591 that, due to the bid document being flawed, a contract would not be awarded. All the bidders filed protests but none raised the City's exclusive contract with IWS as an issue. Ultimately, the contract was awarded to IWS but for only a six-month period. In April 1994, HRS published another ITB on Bid # 595-594 for waste disposal services at the Hospital. In the section entitled "SECTION A. INTRODUCTION," the ITB provides in pertinent part: STATEMENT OF NEED [T]he department requires the services of a qualified waste disposal company to provide waste disposal services to maintain sanitary conditions essential to the health, safety and well being of residents and staff living and working at the hospital. STATEMENT OF PURPOSE Pursuant to Florida Statutes, Chapter 287, this Invitation to Bid is being issued by the State of Florida, Department of Health and Rehabilitative Services, South Florida State Hospital, to obtain the services of a suitably qualified provider to enter into a contract for the removal and disposal of garbage from the hospital campus, and related services; in keeping with hospital requirements and the waste flow control ordinance of the City of Pembroke Pines. In the section "SECTION B. ITB SPECIFICATIONS: MINIMUM DEPARTMENTAL REQUIREMENTS," the ITB provides in pertinent part: PROGRAMMATIC REQUIREMENTS Method of Service Delivery 13) The provider will dispose of waste collected from the hospital at disposal site(s) specified by the City of Pembroke Pines, in keeping with the city's waste flow control ordinance. * * * Other Special Requirements * * * 2) Bidders Eligibility Requirements The successful bidder, in order to contract with the department to provide the services requested by this Invitation to Bid, must have all licenses and/or permits in accordance with city and county ordinances, rules, regulations, and provisions. All licenses and/or permits must be obtained at provider's expense. All costs for tests and inspections shall be paid for by the provider. GENERAL INFORMATION * * * Acceptance of Bids [T]he department reserves the right to reject any or all bids or waive minor irregularities when to do so would be in the best interest of the State of Florida. Minor irregularities are those which will not have a significant adverse effect on overall competition, cost or performance. In the section entitled "SECTION E. BID EVALUATION CRITERIA AND BID TABULATION," the ITB provides in pertinent part: 1) Evaluation Committee An evaluation committee of at lest three (3) members will be established to select the lowest responsive and qualified bidder. * * * 3) Evaluation of Bids Following the bid opening, the committee will review bid packages, beginning with the lowest cost bid, for compliance with the ITB requirements. A Fatal Items Checklist (Appendix IX) will be used to evaluate all bid packages. All items on the checklist MUST be met in order for the proposal to be considered. Receipt of a "No" response for any item will result in automatic rejection of the bid. All references will be checked. Only bidders with a good record of satisfactory performance will be considered. The contract will be awarded to the lowest responsive and qualified bidder who meets all the criteria specified in this ITB. The section entitled "General Conditions" of the ITB Contractual Services Bidder Acknowledgment form provides in pertinent part: 7. AWARDS: As the best interest of the State may require, the right is reserved to make award(s) by individual service, group of services, all or none, or a combination thereof; to reject any and all bids or waive any minor irregularity or technicality in bids received. Bidders are cautioned to make no assumptions unless their bid has been evaluated as being responsive. In response to the ITB, HRS received bids from Browning Ferris Industries which had previously bid on Bid # 595-591, Coastal Carting, Ltd., IWS which had also previously bid on Bid #595-591, Son Mar South Sanitation, Inc. (SON MAR), and Southern Sanitation Service which had also previously bid on Bid # 595-591. SON MAR was the apparent lowest bidder with a bid of $72,200.48 for the first year, $79,420.52 for the second year, and $87.362.57 for the third year, totalling $238.983.57, and IWS was the apparent second lowest bidder with a bid of $106,739.84 for the first year, $112,734.46 for the second year, and $121,971.12 for the third year, totalling $341,445.42. Subsequently, IWS' bid was recalculated due to HRS discovering a calculation error by IWS. The recalculation was performed without a reconvening of the Evaluation Committee and resulted in IWS' bid being $113,579.84 for the first year, $119,814.46 for the second year, and $129,291.12 for the third year, totalling $362,685.42. The Evaluation Committee reviewed all the bids and evaluated them using, among other things, the Fatal Items Checklist. If one item in the checklist were not satisfied, a bid would be disqualified. Pertinent to this case, both SON MAR and IWS satisfied the Checklist and all other evaluation criteria used by the Committee. On May 12, 1994, the Bid Tabulation sheet was posted. HRS indicated its intent to award Bid # 595-594 contract to SON MAR as the apparent lowest and responsive bidder. At that time, HRS was aware that SON MAR had no licenses or permits issued by the City. The Evaluation Committee considered the absence of a license or permit as not material to awarding the bid 1/ and were aware that an awardee obtaining a license or permit would involve a simple process of the awardee completing an application for and paying a fee to the City. By letter dated May 20, 1994, HRS requested that the City advise it of any permits and/or licenses required by the City for an awardee to provide waste removal services to the Hospital. HRS did not receive a written response to its letter. Instead, the City orally advised HRS that it (the City) would issue SON MAR a special permit which would be issued upon SON MAR making application for an occupational license and paying a franchise fee. SON MAR was agreeable to complying with the City's terms and conditions. SON MAR dispatched one of its representatives to the City to obtain an application for the license. However, the City refused to provide SON MAR an application. By letter dated June 13, 1994, IWS filed its formal bid protest of Bid # 595-594 with HRS alleging, among other things, that SON MAR did not have a license from the City to provide waste removal services because it (IWS) had the exclusive waste removal contract with the City, that, without a license, SON MAR could not comply with the bid eligibility requirements and that, therefore, the bid should be awarded to it (IWS). On or about June 28, 1994, SON MAR notified the City that its refusal to issue it (SON MAR) an occupational license was unconstitutional per a U.S. Supreme Court case and requested immediate issuance of the license. SON MAR forwarded HRS a copy of this notification and request. By letter dated June 30, 1994, the City notified SON MAR that it would not issue it (SON MAR) a permit to provide waste removal services in the City, as such an action would violate the exclusive franchise agreement that it (the City) had with IWS. On or about June 30, 1994, HRS was aware that the City would not permit SON MAR to provide waste removal services in the City as it received a copy of the City's letter to SON MAR. On July 14, 1995, HRS and IWS settled the protest filed by IWS, without involving SON MAR in the negotiations. The terms of the settlement, which were communicated to SON MAR on July 15, 1995, were that IWS would dismiss its protest if, within ten days, 2/ SON MAR obtained a license/permit from the City, produced the license to HRS and otherwise remain qualified for the award and that, if SON MAR was unable to obtain a license from the City, HRS would declare SON MAR unqualified and declare IWS the lowest responsive and qualified bidder and award the bid to IWS. SON MAR was unable to obtain a license from the City. Moreover, the City refused to provide SON MAR with an application, remaining consistent with its letter of June 30, 1994, to SON MAR. As SON MAR was unable to obtain a license within the prescribed ten- day period, by letter dated July 29, 1994, HRS notified all bidders to Bid # 595-594 that it was declaring SON MAR unqualified and of its intent to award the bid to IWS, as the next lowest and qualified bidder. Further, HRS notified the bidders that the bids of IWS and another bidder were recalculated to correct a calculation error, which would not affect the order of the bids. By letter dated August 9, 1994, SON MAR notified HRS of its intent to file a formal protest. On or about August 24, 1994, SON MAR filed its formal protest. At no time material hereto, has SON MAR pursued any civil action to challenge the validity of the exclusive contract between the City and IWS or the constitutionality of the City's Ordinance.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health and Rehabilitative Services enter a final order awarding Bid # 595-594 to Industrial Waste Service, Inc. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 28th day of March 1995. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of March 1995

Florida Laws (7) 112.41120.53120.57120.68284.30287.012287.057
# 7
JAMES H. REDDEN vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-007542 (1991)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Nov. 21, 1991 Number: 91-007542 Latest Update: May 14, 1992

The Issue The issue in this case is whether the Petitioner has the actual experience required for certification as a Class B domestic wastewater treatment plant operator.

Findings Of Fact By application filed September 16, 1991, James H. Redden applied for certification as a Class B domestic wastewater treatment plant operator. At the time of the application, Mr. Redden was employed as a laboratory technician at a Class B Collier County regional wastewater treatment facility. From August 15, 1978, to July 31, 1989, Mr. Redden was employed at the Colgate-Palmolive Company facility at Jeffersonville, Indiana. The Colgate-Palmolive treatment facility is an Indiana Class D industrial wastewater treatment plant. Mr. Redden is certified by the State of Indiana as a Class D industrial wastewater treatment plant operator. During his employment at the Jeffersonville facility, Mr. Redden held positions as an associate chemist, senior chemist/plant microbiologist, and wastewater treatment plant supervisor. His duties included daily operations and supervision of personnel, scheduling and performance of maintenance activities, budgeting, ordering, materials balance, sludge management, laboratory analysis, quality assurance and quality control programs, and compliance with various state and federal reporting requirements. Mr. Redden has no experience either in the operation of a drinking water or domestic wastewater treatment plant, or at a DER-permitted industrial wastewater treatment plant.

Recommendation Based on the foregoing, it is hereby: RECOMMENDED that the Department of Environmental Regulation enter a Final Order denying the application of James H. Redden for certification as a Class B wastewater treatment plant operator. DONE and RECOMMENDED this 9th day of April, 1992, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of April, 1992. APPENDIX The following constitute rulings on proposed findings of facts submitted by the parties. Petitioner: The Petitioner did not file a proposed recommended order. Respondent: The Respondent's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 2-4. Rejected, unnecessary. COPIES FURNISHED: Carol Browner, Secretary Dept. of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, General Counsel Dept. of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 James H. Redden 1362 Chesapeake, Avenue Naples, Florida 33962 Francine M. Ffolkes, Esq. Assistant General Counsel 2600 Blair Stone Road Tallahassee, Florida 32399

Florida Laws (1) 120.57
# 8
DEPARTMENT OF ENVIRONMENTAL REGULATION vs BARTOW ETHANOL, INC., 93-001549 (1993)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Mar. 19, 1993 Number: 93-001549 Latest Update: Aug. 10, 1993

The Issue Whether Respondent is in violation of various provisions of Chapter 403, Florida Statutes, as alleged in the Notice of Violation and Orders for Corrective Action dated October 30, 1991.

Findings Of Fact BEI's composting facility is a potential source of water and air pollution and to operate the facility, BEI requires a permit issued by DER. The original permit issued to DER for this facility expired on June 1, 1991 and has not been renewed. Although its permit had expired, BEI was allowed to continue to operate while informal proceedings were ongoing between BEI and DER. When these informal proceedings were terminated by DER on May 20, 1992, further operation of this composting facility was in violation of Chapter 403.707(1), Florida Statutes, and Rule 17-709.400(1), Florida Administrative Code. On at least two occasions while this composting facility was in operation, the air around the facility was polluted by foul odors. During the period following the expiration of BEI's license, BEI failed to submit monthly operating reports and did not conduct quarterly samplings and testing of the compost and submit the testing to DER as required.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Secretary of the DER enter a Final Order finding that BEI has violated Section 403.161(1)(b), Florida Statutes, on each of five counts; and that BEI should immediately cease operation of its solid waste facility, volume reduction plant, until and unless it obtains an appropriate and valid permit from DER and in that regard, BEI shall: Immediately cease acceptance of all materials on the property. In the event that Respondent does not receive a permit from the Department to resume operations at the facility, within 90 days of the effective date of the Final Order, Respondent shall remove all solid waste from the property to an approved solid waste management facility and provide the Department written documentation of its disposal within 30 days of removal. In the event that Respondent does receive a permit from the Department to resume operation at the facility, Respondent shall remain in strict compliance with all terms and conditions of such permit. Within 30 days of the effective date of the Final Order, Respondent shall, if it has not already done so, provide the following to the Department: All records of testing and monitoring conducted on the compost material since January 1, 1990, including daily reports on the temperature and moisture content of compost material, and any testing of compost material conducted prior to distribution. All records documenting application rates of stillage, manure, and leachate to the compost withdrows since January 1, 1990. All records, documenting distribution of composted or mulch material, including amount of compost or mulch material delivered, date of delivery, specific destination of compost or mulch, and intended use of compost or mulch material delivered, since January 1, 1990. All records documenting amount of yard trash received at the facility since January 1, 1990. Within 30 days of execution of the Final Order, Respondent shall make payment to the Department for costs and expenses in the amount of $500.00. Payment shall be made by, cashier's check or money order to the "State of Florida Department of Environmental Regulation". Payment, specifying Office of General Counsel Case No. 91-2006, shall be sent by certified mail to Administrator, Division of Waste Management, Department of Environmental Regulation, 3804 Coconut Palm Drive, Tampa, Florida 33619. DONE AND ENTERED this 16th day of June, 1993, in Tallahassee, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of June, 1993. COPIES FURNISHED: Tracey S. Hartman, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Howard C. Batt, Esquire 611 Druid Road East Suite 712 Clearwater, Florida 34616 Virginia B. Wetherell, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Ken Plante, Esquire General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (4) 120.57403.087403.161403.707
# 9
FAYE DOBBS vs IMC FERTILIZER, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 90-002650 (1990)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Apr. 30, 1990 Number: 90-002650 Latest Update: Jan. 07, 1991

The Issue Whether Petitioner's application for renewal of water use permit application #200781.02 should be granted to withdraw a combined average withdrawal of 9,320,000 gallons of water per day and a maximum combined withdrawal rate of 18,600,000 gallons per day, subject to the terms and conditions listed in proposed permit for use at applicant's Haynesworth Mane.

Findings Of Fact IMCF operates a phosphate mining facility known as the Haynesworth Mine located on SR 37 in western Polk County, south of Bradley Junction. IMCF leases this mine from Brewster Phosphates, which is a joint venture of American Cyanamid Corporation and Kerr-McGee Corporation. The mine includes approximately 14,100 acres. IMCF took control of the mine from Brewster in 1986. At the time IMCF took control of this mine, a consumptive water use permit was extant which was due to expire in 1989. It is to renew this permit that the application here being considered was filed. After requesting and obtaining additional information and evaluating the application, Respondent issued its notice of intent to issue the permit. Phosphate ore is extracted by a dragline which opens mining cuts of 30 to 40 feet in depth at this facility. Seepage occurs into the mine cuts which must be removed in order to see and extract the phosphate ore. Dewatering is also necessary to protect the dragline from slope stability problems. Water pumped out of the mining cuts is introduced into the mine water recirculating system where it is used for numerous purposes, such as hydraulically pumping the extracted material to the beneficiation plant where clay and sand is extracted from the phosphate ore. The beneficiation plant uses large quantities of water, utilizing supplies from within the mine system (surface waters) and some from deep wells. It is the water from the deep wells that is the primary concern of the Intervenor. The surface water comes primarily from rainfall, mine cut seepage and make up water from the deep wells. Recycled water is of lower quality than well water due to the presence of organic materials or suspended solids, but it is used for many purposes, such as washing ore before being sent to settling ponds and later decanted from the top of the settling areas and returned to the water recirculating system. By use of recircled water in the beneficiation plant, the quantity of well water needed in later stages of the mining process and for make up due to evaporation and transpiration losses is reduced. Evidence presented shows that IMCF, by improving the recirculation system, has reduced the amount of well water needed in the overall mining process from 1220 gallons of deep well water per ton of phosphate rock produced in 1987 to 775 gallons per ton in 1989. The use here proposed is greater than was approved in the expiring permit; however, this increase is due almost entirely to the inclusion of the water pumped in the dewatering operation and the sealing water wells which were not counted in earlier years in determining the quantity permitted to be pumped. Withdrawal of water from the mine cuts affects only the surficial aquifer and can result in a withdrawal of water from adjoining property. To mitigate this problem, a setback of 1100 feet from adjacent property has been established in which mining cannot be conducted. Additionally, a ditch is to be installed between the mining cut and the property line which is kept full of water to provide recharge to the surficial aquifer. Phosphate mining is a reasonable and beneficial use of water, and is consistent with the public interest. The use here proposed was grandfathered in long before the Intervenor received a consumptive use permit in 1986 and will not interfere with any legal use of water existing at the time of the application. Considerable testimony was presented describing the computer modelling process used by IMCF and SFWMD in determining that the maximum drawdown of the water allowed by this proposed permit would not have a deleterious effect on adjacent property owners or on the Florida aquifer from which much of this water will be drawn. As a result, it is found that the rate of flow in nearby streams or watercourse will not be lowered; the level of the potentiometric surface will not be lowered below the regulatory level established by SFWMD; the drawdown will not induce salt water encroachment; will not cause the water table to be lowered so that lake stages or vegetation will be significantly affected on property not owned by the applicant; will not cause the potentiometric surface to be lowered below sea level; and the granting of this permit is in the public interest. The Intervenor's property consists of a 62 acre orange grove planted on reclaimed phosphate land that was mined more than 30 years ago and is surrounded by the 14,100 acres now controlled by IMCF. Her primary concern is that IMCF's mining operations will withdraw surficial water that would otherwise go to her orange grove, and that sufficient water will be withdrawn from the Florida aquifer that she will not have sufficient water to irrigate her grove. To support this position, Intervenor presented evidence that prior to 1986 her grove prospered with only natural rainfall. However, in 1986 it was found necessary to install a well to provide irrigation to this grove; and a permit was obtained from SFWMD. Subsequently, during a dry spell in April 1988 the surface pressure at Intervenor's pump dropped from 22 psi to less than 15 psi, and she was told the pumps would be burned out if pumping continued and the pressure dropped further. She attributed this low pressure at her pump to IMCF taking water from the aquifer from which her water also was drawn. During the period around April 1988, the ground water level dropped 15 to 20 feet below the average level of the water from which Intervenor drew her irrigation water. This resulted in the submersible pump having to lift water 15 to 20 feet (or more) higher than it had to lift when the pressure of the pump was 22 psi. In other words, Intervenor's pump was completely submerged in the water in the upper Florida aquifer, but the pump was not powerful enough to provide 22 psi pressure at the earth's surface. Changes in the ground water levels vary during each year depending on the amount of rainfall and the demands of those removing water from the aquifer. Spring time usage is normally heavy for agricultural purposes, and, as shown on Exhibit 25, each spring the ground water levels are closer to sea level than at any other time of the year. Intervenor also contended that IMCF should retain all of the water used in the mining process on its land rather than allowing the excess during heavy rainfall periods to be discharged into the Alafia River. No evidence was presented by Intervenor to show this to be a feasible solution; nor was evidence presented that this discharge polluted the Alafia River as contended by Intervenor. The Haynesworth Mine is a stationary installation which is reasonably expected to be a source of water pollution. Accordingly, it is required to obtain a permit from the Department of Environmental Regulation to discharge water into the Alafia River and is subject to various restrictions in so doing. No evidence was presented that IMCF or Haynesworth Mines violated any of the provisions of Chapter 403, Florida Statutes, in this regard.

Recommendation It is recommended that consumptive use permit #200781.02 be issued to IMC Fertilizer Inc., subject to the conditions contained in the draft permit. ENTERED this 7th day of January, 1991, in Tallahassee, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The Desoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of January, 1991. COPIES FURNISHED: Robert W. Sims, Esquire Post Office Box 1526 Orlando, FL 32802 Catherine D'Andrea, Esquire 2379 Broad Street Brooksville, FL 34699-6899 Faye Dobbs Post Office Box 3407 Lakeland, FL 33802

Florida Administrative Code (1) 40D-2.301
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer