Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
FLORIDA EAST COAST RAILWAY COMPANY, ET AL. vs. INDIAN RIVER COUNTY AND DEPARTMENT OF TRANSPORTATION, 75-001098 (1975)
Division of Administrative Hearings, Florida Number: 75-001098 Latest Update: Feb. 27, 1976

Findings Of Fact By application the Florida East Coast Railway Company seeks a permit to close an existing at-grade public railroad crossing located at Sebastian/Bay Street, Roseland in Indian River County, Florida. There exists a public at-grade railroad crossing 681 feet immediately to the south of the subject crossing at the intersection with Roseland Road. This crossing is protected by a full complement of automatic warning devices, consisting of flashing lights, ringing bells and gate. Roseland Road is a paved highway and well travelled. The subject crossing is an old crossing having been established approximately in 1907. There exists a visibility factor adverse to train and motoring public as a result of an elevation of approximately four (4) feet and of natural growth but there as been no known crossing accident in over some seventy (70) years. Traffic over this railroad crossing is not heavy. There exists a growing residential community to the west and east of this railroad crossing. The Sebastian River Medical Center (hospital) exists on the east. Fire protection for this area exists on the east. Testimony of users and letters oppose the closing of the crossing because the historical value of the railroad crossing, the location of the crossing for fire protection purposes, the location of the crossing for the health and welfare due to the location of the Sebastian River Medical Center, the only hospital located in the north end of the county; and the ease and convenience for the Roseland community reaching the main thoroughfare known as U.S. #1. The public crossing on Roseland Road is a busy crossing serving a much travelled road and is well signalized. In order to use this crossing it is essential to enter a busy highway. The people belonging to the church and the personnel of the medical facility use the Sebastian/Bay Street crossing; school children use it and the residents of the Roseland area, many of whom are elderly, use it.

# 1
DEPARTMENT OF TRANSPORTATION vs. CITY OF MARIANNA, 89-003557 (1989)
Division of Administrative Hearings, Florida Number: 89-003557 Latest Update: Nov. 14, 1989

Findings Of Fact The City is an incorporated city within the State of Florida. The subject railroad crossing on South Caledonia Street is located within the city limits of Marianna. The DOT is the agency of state government which is charged with the regulation of railroad crossings, to include the determination of whether a crossing should be opened or closed. The CSX is the railroad company which owns the railroad and railroad crossing in question and which may have to pay a portion of the costs of any improvements to the crossing. South Caledonia Street is constructed along a section line and runs due south through Marianna connecting US 90, a major east-west arterial highway, with the southern portion of Marianna and its rural environs as it becomes Highway 73 at its intersection with Jefferson Street. See Railroad's Exhibit 1. South Caledonia Street, one of ten north-south streets which crosses the railroad within the limits of Marianna, is the only one which runs straight south over the tracks to Interstate 10. South Caledonia Street is one of the four streets which provides transit over the tracks in the eastern portion of Marianna. In order from east to west, Jefferson Street, Green Street, Caledonia or South Caledonia Street (the one in question), and West Caledonia Street run north and south and provide the principal links between US 90 and South Street, in the eastern portion of the City. South Street is a major east-west street in the southern part of the City. The other east-west roads south of US 90 are Jackson Street north of the railroad; Pearl Street running west from South Caledonia between the railroad and South Street; and unpaved Franklin Street running eastward immediately north of the railroad between Caledonia and Green Streets and running westward south of the railroad between Caledonia and West Caledonia Streets. South Caledonia and West Caledonia Streets are principally residential from South Street to one block south of the railroad tracks, and commercial north of the railroad tracks. DOT's Exhibit 1 is an annotated aerial photograph of this portion of the City showing the major roads named above and the daily traffic counts on them. In recent years, the railroad crossings on West Caledonia, Green, and Jefferson Streets have been upgraded to current standards. The crossing on Caledonia Street is not improved, and the street is in very poor condition between Jackson and Pearl Streets; however, planned resurfacing of the street has been delayed while this case is litigated because upgrading the crossing will require recontouring of Caledonia Street. The poor condition of Caledonia Street has reduced traffic on the street over the railroad and has caused the existing traffic to go slower. There has never been a train-car accident at the South Caledonia Street crossing. Recontouring Caledonia Street at the railroad crossing will eliminate or reduce access to A.B. Williams Concrete and Block Company from Caledonia Street; however, there is access to the company from Green Street. The owner supports keeping the crossing open even if it restricts access to his business. Recontouring Caledonia Street would make it feasible for heavy trucks to move over the crossing on South Caledonia Street which is Highway 73 south of its intersection with Jefferson Street. Currently, the majority of the heavy truck traffic is using West Caledonia to move south and turning left on South Street to come back to Caledonia Street and out Highway 73. The intersection of West Caledonia and South Street is not well suited for such traffic. It will cost at least $250,000 to upgrade the existing crossing. It costs $612 each year to maintain the upgraded crossing. Letting the crossing remain open will have no effect on the operations of the railroad. There was no evidence presented on the costs of paving Franklin Street or the unpaved portions of the railroad right-of-way to enable traffic stopped at the railroad to move east and west north of the tracks or westward south of the tracks. There is no available route eastward south of the tracks. No evidence on the traffic count over the crossing was presented. The DOT did not take a traffic count over the crossing. If the closure of the South Caledonia Street crossing increases the traffic on Jefferson Street, currently 4,000 vehicles per day, to 5,000 vehicles per day, the Jefferson Street crossing will have to be upgraded to have bells, lights and gates. A significant increase in traffic count on Jefferson Street is possible given the current use rate of Caledonia Street north and south of the railroad, which is known. No evidence was presented on the cost of upgrading the Jefferson Street crossing. Caledonia Street is not used by emergency vehicles or school buses, and there are viable alternatives for emergency vehicles to cross the railroad tracks if this crossing were eliminated. However, closing this crossing will create a cul-de-sac north and south of the existing crossing on Caledonia Street because of the absence of paved east-west through streets. As indicated above, it will be very inconvenient and costly to create east-west links to eliminate these cul-de-sacs. In spite of the poor condition of the crossing and the road surface and the availability of alternatives, Caledonia Street carries more traffic than does Green Street which has had its crossing upgraded. Caledonia Street, upon which the subject crossing is located, is the only straight north-south route from US 90 to Highway 73. The preservation of this route for the future must be considered.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, therefore, RECOMMENDED that CSX, Inc.'s Petition to close the public vehicular crossing on Caledonia Street in Marianna, Florida, be denied, and said crossing be kept open. DONE AND ORDERED this 14th day of November, 1989, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of November, 1989. COPIES FURNISHED: Mr. Ben C. Watts Interim Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Thomas H. Bateman, III, Esquire General Counsel Department of Transportation 562 Haydon Burns Building Tallahassee, Florida 32399-0450 Michael D. Mee, Esquire Department of Transportation 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0458 Stephen H. Shook, Esquire 500 Water Street Jacksonville, Florida 32202 Herman D. Laramore, Esquire Post Office Box 793 Marianna, Florida 32446 ================================================================= AGENCY REMAND ================================================================= STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION AND CSX TRANSPORTATION, INC., Petitioners, vs. DOAH CASE NO. 89-3557 CITY OF MARIANNA, Respondent. / ORDER REMANDING CAUSE FOR RECONSIDERATION The Recommended Order was issued in this cause on November 14, 1989. On December 4, 1989, the Department of Transportation filed Agency's Exceptions to Recommended Order, copy of which is attached. A review of the complete record has been made. The Department of Transportation remands the instant cause to Stephen F. Dean, Hearing Officer, Division of Administrative Hearings, for reconsideration based on the following: The Recommended Order states in Finding of Fact Number 9 that the closure or the South Caledonia Street crossing would increase the traffic on Jefferson Street resulting in one upgrading of the Jefferson Street crossing by the addition of bells, lights and gates. The finding is not supported by competent substantial evidence in the record. At the hearing below, testimony was adduced that the Jefferson Street crossing has already been upgraded with bells, lights and gates. (Transcript pages 99 - 100) Since the Hearing Officer relied, in part, upon this incorrect factual determination, the case is remanded to the Hearing Officer for reconsideration pursuant to the facts as corrected. Accordingly, IT IS ORDERED that the instant cause is remanded, for twenty days following receipt of this Order, to Stephen F. Dean, Hearing Officer, Division of Administrative Hearings for reconsideration. DONE AND ORDERED, this 21st day of December, 1989. BEN G. WATTS, Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 COPIES FURNISHED: Stephen H. Shook, Esquire 500 Water Street Jacksonville, Florida 32202 Herman D. Laramore, Esquire Post Office Box 793 Marianna Florida 32446 Michael D. Mee Department of Transportation 605 Suwannee Street Tallahassee, Florida 32399-0458 ================================================================= ORDER ON REMAND =================================================================

Florida Laws (3) 120.68335.14135.22
# 2
HARDEE COUNTY AND MITCHELL HOPE vs. SEABOARD COASTLINE RAILROAD COMPANY AND DEPARTMENT OF TRANSPORTATION, 76-001703 (1976)
Division of Administrative Hearings, Florida Number: 76-001703 Latest Update: Jan. 27, 1977

The Issue Whether a permit should be granted for a public at-grade crossing over Seaboard Coast Line Railroad tracts near its Milepost AX-892.

Findings Of Fact Mr. Mitchell Hope and Hardee County, Florida, by application to the Department of Transportation, sought to open a public railroad-highway grade crossing at a location where a proposed road would intersect the tracks and right of way of Seaboard Coast Line Railroad Company near its Milepost AX-892. The property to be reached by the proposed at-grade crossing is owned by Applicant Hope and other private individuals. Other access to the property would be by crossing the Peace River to the south and east, or industrial property to the north, or by a grade separation over the railroad. The property consists of approximately 77 acres, of which 25 acres could be developed for residential purposes consisting of one-acre plots. The nearest crossing to the south is a public crossing in Zolfo Springs, approximately one-half mile; the nearest crossing to the north is a private crossing, approximately one mile. The scheduled train speed is thirty-five (35) miles per hour. Two freight trains each weekday and one each weekend day are scheduled to pass the proposed crossing. Applicant Hope is willing to close the crossing to the public by means of a gate. The Board of County Commissioners of Hardee County is willing to accept the road and crossing into the County Road System provided the road meets engineering standards. Representatives of both Applicants are unwilling to provide or maintain automatic grade crossing traffic control devices. The roadway approaches to the proposed crossing are as follows: From the west the sight distances between the roadway and the tracks are good provided the foliage and underbrush are kept cut near the ground. From the east the sight distance to the northeast quadrant is obstructed by trees and underbrush and complicated by the track curvature to the northeast; the sight distance to the southeast quadrant is somewhat less obscured but could be blocked by the growth of trees and underbrush. The track approaches to the proposed crossing from the north are complicated by the curvature of the track which tends to prevent a view of the crossing until the train is within one-third of a mile from the crossing; the track view of the northeast quadrant is blocked by trees. The track approaches from the south are good. The Department of Transportation has recommended the installation of automatic grade crossing traffic control devices consisting of flashing lights, bells and gates at such location if a crossing is found to be necessary.

Recommendation Dismiss the application to open a public railroad-highway grade crossing at a location near Seaboard Coast Line Railroad Milepost AX-892, but retain jurisdiction for some future time when the facts may indicate the necessity for the crossing at which time the type of traffic control devices can be determined. Hold each of the other proposed findings of fact and requests to be without merit. DONE and ORDERED this 10th day of January, 1977 in Tallahassee, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Philip S. Bennett, Esquire Department of Transportation Haydon Burns Building Tallahassee, Florida 32304 Brian J. Pappas, Esquire Attorney at Law 305 North Sixth Avenue Wauchula, Florida 33873 G. S. Burlesen, Sr. Assistant State Utility Engr. (RRS) Haydon Burns Building Tallahassee, Florida 32304 R. Earl Collins, Esquire Attorney, Hardee County Wauchula, Florida 33873 Eugene R. Buzard, Esquire Seaboard Coastline Railroad Co. 500 Water Street Jacksonville, Florida 32207

Florida Laws (3) 334.03335.01336.01
# 4
FLORIDA PUBLIC UTILITIES COMPANY vs DEPARTMENT OF TRANSPORTATION, 98-004461 (1998)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 08, 1998 Number: 98-004461 Latest Update: Mar. 19, 1999

The Issue Whether the application of the Florida East Coast Railway Company (FEC) to close the subject railway crossing should be dismissed for lack of regulatory jurisdiction.

Findings Of Fact Petitioner owns and operates a propane gas distribution facility adjacent and parallel to the FEC railroad track within the Town of Lantana. The railroad track is between Petitioner's facility and U.S. Highway 1. To reach its property from U.S. Highway 1, Petitioner's employees must utilize a railroad crossing commonly known as Gator Culvert. The Gator Culvert is an at-grade railroad crossing. On October 13, 1948, the Town of Lantana acquired a right-of-way for road purposes at the Gator Culvert from Everett Wurtz, Petitioner's predecessor in title. On December 13, 1948, FEC and the Town of Lantana entered into a one-year renewable license to use the crossing for public road crossing purposes contingent upon the Town of Lantana assuming the cost of maintaining the crossing. On June 26, 1979, the Town of Lantana quit-claimed its interest in the right-of-way to Gator Culvert.2 On March 29, 1996, Petitioner filed suit against FEC seeking declaratory and injunctive relief regarding its rights to use the Gator Culvert crossing. This litigation is pending in Circuit Court in Palm Beach County, Florida. On June 28, 1996, FEC filed the subject application with Respondent for authorization to close the Gator Culvert crossing. On October 2, 1996, Petitioner amended the complaint that underpins the Circuit Court litigation to join Respondent and the Town of Lantana as defendants. By Count One of the Amended Complaint, Petitioner (referred to as Plaintiff in the Circuit Court pleadings) requests the Court to: . . . grant a declaratory judgment ruling that Plaintiff has a way of necessity purusant to F.S. Section 704.01(1) and that Defendants FEC, FDOT, and Town of Lantana may not close the crossing and thereby prevent Plaintiff's use of its way of necessity. Plaintiff further requests a trial by jury pursuant to F.S. Section 86.071. By Count Two of the Amended Complaint, Petitioner requests the Court to: . . . grant a declaratory judgment ruling that Plaintiff has a prescriptive easement and that Defendants FEC and the Town of Lantana may not close the crossing and thereby prevent Plaintiff's use of said easement. Plaintiff further requests a trial by jury pursuant to F.S. Sectioln 86.071. By Count Three of the Amended Complaint, Petitioner requests the Court to: . . . enter a temporary and permanent injunction restraining and enjoining Defendant, FDOT from granting FEC's application to close the crossing; to restrain and enjoin Defendant FEC from ceasing to maintain and from closing the railroad crossing which provides the only access to Plaintiff's property; and to restrain and enjoin the Town of Lantana form executing the Stipulation for Approval of Closure3 or participating in any way with the attempted closure of said crossing. Count Four of the Amended Complaint pertained only to the Town of Lantana and did not involve Respondent. On August 14, 1998, Respondent published its Notice of Intent to Dismiss Application to close the subject railroad crossing in the Florida Administrative Weekly. This notice set forth Respondent's rationale for dismissing the application to close the Gator Culvert crossing that FEC had filed June 28, 1996, in pertinent part, as follows: . . . The history of the crossroad, and its current condition indicate that it is not a public road. In particular, on the 26th day of June 1979, the Town of Lantana quit- claimed its interest to the right of way for public road purposes to Gator Culvert. While the prior status of the road as a public road is in doubt, this transaction effectively abandoned the right of way as a potential public roadway. Because the crossing is not a public railroad-highway grade crossing, the location is not subject to the Department's jurisdiction pursuant to Section 335.141, Florida Statutes. . . . On September 4, 1998, Petitioner timely filed its Petition for Formal Administrative Hearing with Respondent, the pleading that underpins this proceeding. On September 10, 1997, the Respondent issued a rails inventory that identified the Gator Culvert crossing as a private crossing. Scott Allbritton, Respondent's Rail Programs Engineer, reviewed and assessed the documents in the public record in processing FEC's application that were necessary and appropriate to determine whether the subject crossing was public or private, thereby determining whether Respondent lacked jurisdiction to regulate the subject crossing. His investigation revealed that the record title to the subject crossing was private. Based on Mr. Allbritton's investigation, Respondent determined that it lacked jurisdiction to regulate the subject crossing since it was not a public crossing. Respondent did not act in an arbitrary or capricious manner in making that determination. Respondent does not attempt to adjudicate real property disputes by its administration of the statutorily mandated railroad/vehicular traffic crossing program.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a final order that dismisses this proceeding. DONE AND ENTERED this 17th day of February, 1999, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 1999.

Florida Laws (5) 120.57335.01335.141704.0186.071
# 5
CITY OF HOLLY HILL vs DEPARTMENT OF TRANSPORTATION, 92-000942 (1992)
Division of Administrative Hearings, Florida Filed:Holly Hill, Florida Feb. 12, 1992 Number: 92-000942 Latest Update: Nov. 03, 1992

The Issue Whether the application for an at grade vehicle railroad crossing permit should be issued to the City of Holly Hill by the Department of Transportation.

Findings Of Fact The City of Holly Hill, Florida, filed an application with DOT for an at grade railroad crossing permit on Tenth Street at Milepost 107+1513', in the city of Holly Hill. The DOT denied the City's application by letter dated November 27, 1991, which enclosed the Department's intent to deny the permit. The City petitioned and received a hearing to consider its application. The City of Holly Hill is located due north of the City of Daytona Beach on the east coast of the state of Florida. It stretches west approximately a mile from the Halifax River, and runs north for approximately two miles from the northern boundaries of the City of Daytona Beach. Tenth Street, where the proposed railroad crossing would be located, is a local street running east and west in the City of Holly Hill, Florida. West of the Florida East Coast Railroad tracks, Tenth Street connects with Center Avenue and continues further west to connect with Nova Road, both of which are major north/south connectors. To the east of the Florida East Coast Railroad tracks, Tenth Street runs less than one block and terminates at its intersection with US 1, the major north/south arterial road in Holly Hill. Immediately east of the Florida East Coast Railroad tracks in the vicinity of Tenth Street, the City of Holly Hill maintains Holly Land Park, a major recreational area in downtown Holly Hill. Immediately to the west of the Florida East Coast Railroad tracks, the City of Holly Hill maintains a nature trail and facilities related to its public works department. The City seeks the permit for an at grade crossing alleging that (1) a large number of pedestrians are illegally crossing the track and have persisted in doing so notwithstanding warnings and citations; and (2) the City feels that opening a crossing at Tenth Street would relieve bad traffic congestion existing on Eleventh Street just north of Tenth at Eleventh's intersection with US 1. Video tapes and the observations of police officers of the City of Holly Hill establish a significant level of pedestrian traffic by adults and children over the railroad tracks between the western and eastern ends of Tenth Street. This practice is very dangerous. Some of the pedestrians walk their bicycles over the railroad tracks at this location. The majority of the young people crossing the tracks in this vicinity are moving east to utilize the facilities in Holly Land Park or moving west to go to the middle school and grammar school located respectively at the intersections of Center Avenue and Walker Street and Center Avenue and Fifteenth Street. This is a popular route because of the heavy vehicle traffic on Eleventh Street and Eighth Street. Warnings, citations, and patrols have not halted the illegal crossing of the tracks. Eleventh Street is located 1300 feet to the north of Tenth Street and also runs east and west from the Halifax River westward to beyond Interstate 95. Plans call for the development of an interchange at the intersection of Interstate 95 and Eleventh Street. Eleventh Street appears to be the only street in downtown Holly Hill which moves directly west in this manner. From Nova Road east to US 1, Eleventh Street runs parallel to and north of a large drainage canal. Two shopping centers are located at the intersection of Eleventh Street and Nova Road. Eleventh Street is so close to this drainage feature that pedestrian walks on the southern side of Eleventh Street were removed. Because of this drainage structure, Eleventh Street cannot be inexpensively widened. To the south of Tenth Street 1320 feet, Eighth Street runs east and west from the Halifax River to Nova Road. Both Eleventh and Eighth Streets are two-way streets along their entire length. The City bases it petition to open the crossing upon traffic congestion caused by east bound traffic on Eleventh Street seeking to turn left on US 1, and by north bound traffic on US 1 seeking to turn left onto Eleventh Street when Eleventh Street is blocked by rail traffic. The I-95/Eleventh Street interchange will increase traffic congestion on Eleventh Street. The City asserts that opening the proposed crossing would alleviate this congestion because traffic using Eleventh Street would then use Tenth Street. The traffic count on Eleventh, Tenth, and Eighth Streets was measured by the county. The traffic on Eleventh Street was 10,744; on Tenth Street was 1,019; and on Sixth Street was 6,153. According to a traffic projection run by the county traffic operations supervisor, 1,000 vehicles would be diverted from Eleventh Street to Tenth Street if a vehicle at grade crossing were opened at Tenth Street. Although this projection is suspect because it was made without any origin and destination surveys being done, the shift of 1,000 vehicles from Eleventh Street to Tenth Street is negligible in terms of its present and projected impact on Eleventh Street. It was uncontraverted that a ground level pedestrian crossing with adequate gates and signals would permit pedestrians to cross the railroad tracks quickly and therefore reduce their exposure to train/bicycle accidents. (T- 81,135.) Opening an at grade crossing on Tenth Street would create a greater potential for car/train accidents by increasing the exposure of vehicle traffic to railroad traffic. This was also uncontraverted. The fire station is currently located in the back of City Hall which is located immediately across US 1 from Holly Land Park. Plans exist to move the fire station from its present current location to a location in the vicinity of the Public Works Department along Tenth Avenue. The public library which is currently located at Holly Land Park affronting on US 1 may be relocated to the old school building located south of the city hall. Movement from the fire- station at its proposed location would be no better or worse than it is now because Tenth Street does not extend east across US 1. Emergency equipment will have to use Eighth Street or Eleventh Street to go east, and these streets are also the best routes west. The proposed crossing is not necessary based upon the traffic studies prepared by the City. Assuming the shift of 1,000 cars from Eleventh Street to Tenth Street, this would not warrant the expense and the potential hazard generated by permitting the proposed railroad crossing. It was uncontraverted that the best way to solve the congestion problem on Eleventh Street would be to widen it. However, it was universally acknowledged that this would be very expensive. While evidence is contradictory, the most credible testimony supports using one-way pairs on Eleventh and Eighth Streets as a low cost interim measure to improve traffic flow along the arterial routes. (T-112,145 et seq., and 173.) In addition to the crossings located at Eleventh and Eighth Streets, there are also crossing located at next to through streets south of Eighth, and at Fromich Street north of Eleventh. There would be more than five public crossings located within one mile of railroad track if a crossing were opened at Tenth Street.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED: That a Final Order be entered approving a pedestrian at grade crossing at Tenth Street in the City of Holly Hill, Volusia County, Florida; and That the Petition for a public at grade vehicular railroad crossing at Tenth Street in the City of Holly Hill, Volusia County, Florida be DENIED. DONE and ENTERED this 5th day of August, 1992, in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of August, 1992. APPENDIX CASE NO. 92-0942 PETITIONER'S PROPOSED FINDINGS Petitioner's Recommended Order Paragraphs 1, 2, 8 Recommended order paragraph no. 4 Paragraph 3, 5, 7, 10 Recommended order paragraph no. 7 Paragraph 4 Recommended order paragraph no. 8 Paragraph 6 Rejected, Data in Paragraph is more credible Paragraph 9 Paragraph 6 Paragraph 11 Immaterial Paragraph 12 Cumulative Paragraphs 13, 14 Immaterial Paragraph 15 Contrary to the fact that Tenth Street ends at US 1 Paragraphs 16, 17, 18 Contrary to more credible evidence Paragraph 19 .027 represents one train/car collision every four years. If you are in the car, that is significant. Paragraphs 21, 22, 23, 24, 25 All these improvements do not establish the necessity for the proposed crossing and appear to be counter to good land use and traffic planning. Paragraph 26 No credible evidence to support this. Paragraph 27 Paragraph 6 Paragraph 28 Paragraph 7 Paragraph 29 Immaterial Paragraph 30 "de facto" crossings don't exist Paragraph 31 Immaterial Paragraph 32, 33, 34, 35 Paragraph 6 Paragraph 36 Paragraph 4 Paragraph 37 Speculative Paragraph 38 Paragraph 7 Paragraph 39 Paragraph 9 Respondent's Recommended Order Paragraph 1 Paragraph 1, 2 Paragraph 2 Paragraph 4 Paragraph 3 Paragraph 6, 10, 11 Paragraph 4 Paragraph 12 Paragraph 5 Paragraph 7 Paragraph 6 Paragraph 13, 14 COPIES FURNISHED: Ben G. Watts, Secretary Department of Transportation Haydon Burns Building, M.S.-58 605 Suwannee Street Tallahassee, FL 32399-0458 Edward F. Simpson, Jr., Esquire Randal A. Hayes, Esquire Moore, Wood, Simpson, Correy, McKinnon and Vulkeja Post Office Box 305 Ormond Beach, FL 32175 Vernon L. Whittier, Jr., Esquire Department of Transportation Haydon Burns Building, M.S.-58 605 Suwannee Street Tallahassee, FL 32399-0458

Florida Laws (3) 120.57120.68335.141
# 6
AGRICO CHEMICAL COMPANY AND SEABOARD COAST LINE RAILROAD vs. DEPARTMENT OF TRANSPORTATION, 75-001881 (1975)
Division of Administrative Hearings, Florida Number: 75-001881 Latest Update: Feb. 27, 1976

The Issue Whether permits for two public at-grade railroad crossings should be granted.

Findings Of Fact By application the Agrico Chemical Company seeks permits to open two public at-grade railroad crossings by constructing a spur track between the Seaboard Coastline Railroad and Agrico Railroad beginning 1,868 feet south of Seaboard Coastline Mile Post SVC 851 at Agrock, Florida. The application involves opening two public at-grade rail highway crossings by new rail line construction. The local popular name of the road is Fort Green Road and Payne Creek Road. Two tracks were constructed less than two years ago so that the Seaboard Coastline Railroad could come off their main line and come into Agrico and pick up loaded or unloaded cars for transportation to the south, north and west. Agrico now desires to construct a track which more directly ties into what they term their Payne Creek trackage to the southeast. The new crossings would come straight across the Seaboard Coastline mainline into the Fort Green trackage. Agrico would have to spend less time on Seaboard Coastline trackage and the plan is to erect electric signal crossings whereas there are no electric signal crossings in the area at the present time. Such signalization would render the crossings less hazardous. The Petitioner Agrico will pay for the signalization at both crossings. Signalization consists of bells and signal lights. The Seaboard Coastline Railroad will maintain the crossings and signalization at the expense of the Petitioner Agrico. There are twelve trains per day. The Respondent Seaboard Coastline Railroad was not represented at the hearing, but a letter was introduced stating that "Seaboard Coastline will indicate no objections to these crossings when the appropriate public hearing is scheduled". The Respondent Department of Transportation reviewed the subject application and expressed the desire of the district railroad committee that Agrico Chemical Company pay for the installation of flashing lights and that the installation would conform to the manual on uniform traffic control devices pertaining to signalized railroad crossings. It also stated that in the interest of good safety practices, no buildings should be constructed or plantings made that would prevent good sight distance at the crossing. Additionally, the Respondent Department of Transportation suggested that the railroad crossings be maintained by "other than the Department of Transportation". The Hearing Officer further finds: The application for new railroad trackage is in the interest of the Petitioner Agrico Chemical Company and is in the interest of the public using the two railroad crossings. Signalization as planned will increase the safety of vehicular traffic.

# 7
DEPARTMENT OF TRANSPORTATION vs. GEORGIA, SOUTHERN, AND FLORIDA RAILROAD COMPANY, 75-001326 (1975)
Division of Administrative Hearings, Florida Number: 75-001326 Latest Update: Jan. 08, 1976

The Issue Whether the Florida Department of Transportation should issue a permit for the installation of a public at-grade railroad crossing in the vicinity of the Georgia, Southern and Florida Railroad track, 1,027 feet North of Milepost 214 on the alignment of Baya Avenue, East of Lake City, Florida.

Findings Of Fact Having heard the testimony of witnesses for the petitioner and the arguments of counsel and those witnesses appearing for the Department of Transportation on the issues and considering the evidence presented in this cause, it is found as follows: Petitioner, Florida Department of Transportation, is duly authorized to establish and maintain a primary system of highways within the boundaries of the State of Florida. The Petitioner has heretofore filed an application with the appropriate division of the Department of Transportation of the State of Florida pursuant to Chapter 330.21 Florida Statutes, for Permission to establish a graded railroad crossing for Baya Avenue (U.S. 90) within the city limits of Lake City, Florida on the state primary highway system proposed to intersect the Respondent Railroad's tracks approximately 1,027 feet North of Milepost 214 of the Georgia, Southern and Florida Railroad. The Respondent Railroad Company did not appear although the record shows that Notice of Hearing was properly given and that plans of the project and proposed signalization were duly sent by letter dated October 8, 1975. There was uncontroverted testimony by Mr. Terry Crews, Assistant District Utilities Engineer for the Petitioner that Mr. R. A. Kelso, Chief Engineer, Design and Construction, Southern Railway System had discussed a portion of the project by telephone with Mr. Crews and no objections were raised. No letters of objection were filed. The Petitioner is in the process of constructing a new four-lane vehicular thoroughfare. This construction is necessary in the rerouting of vehicular traffic through Lake City, Florida (U.S. 90). As a part of this construction it is necessary to cross the railroad and State Road 100 which lie adjacent to each other. It will be a four-lane divided highway with a painted median, with curbs and gutters in the vicinity of the crossing. At the time of construction, the railroad will consist of single-line trackage that carries two (2) trains per day at speeds of approximately 20 miles per hour. It is estimated that approximately 20,000 vehicles per day will use this facility by 1984. Studies conducted by Department of Transportation personnel reveal that the crossing should be signalized with cantilevered flashing lights, ringing bells and pavement markings in accordance with the Manual on Uniform Traffic Control Devices. This signalization should be interconnected with vehicle traffic signalization located at State Road 100 to control vehicular traffic at the highway crossing as well as the railroad crossing. The applicant agrees to install and maintain such signalization. The Hearing officer further finds: The proposed crossing is necessary and desirable; The signalization is adequate as planned, to protect the public; The Petitioner needs the crossing; The Respondent has not opposed the crossing; The Petitioner, Florida Department of Transportation, will Install and maintain the crossing.

# 8
CITY OF BOCA RATON vs. FLORIDA EAST COAST RAILWAY AND DEPARTMENT OF TRANSPORTATION, 78-001250 (1978)
Division of Administrative Hearings, Florida Number: 78-001250 Latest Update: Sep. 25, 1979

The Issue At issue herein is whether or not the application of the City of Boca Raton Applicant, to open an at-grade crossing at Southwest 18th Street (Milepost 326 + 100') within the City of Boca Raton should be granted.

Findings Of Fact Based on the testimony of the witnesses and their demeanor while testifying, the arguments of counsel and the documentary evidence offered during the hearing, consideration of the Proposed Findings of Fact and Conclusions of Law submitted by the parties, the following relevant facts are found. Southwest 18th Street is located in the southern quadrant of the City. Presently, it is unimproved from an area immediately west of Military Trail and proceeds east with an overpass over Interstate 95 into the Seaboard Railway tracks through the City and terminates just prior to the El Rio Canal (See City's Exhibit 1). Two citizens groups appeared at the hearing and offered testimony against the application. The first group consisted primarily of residents of the Boca Bayou Condominium, which is an area east of the Railway's mainline track and Dixie Highway. Opposition from residents of Boca Bayou was essentially to the fact that the proposed crossing and its extension at Southwest 18th Street would increase automobile traffic, train noise, and air pollution, and thus diminish the value of their residences; and, secondly, that the construction of another crossing would create an additional source of vehicular contact, and thus a source for additional automobile accidents. The other group opposition to the subject application emanated from residents of Camino Lakes. Stan Radzkowski, a resident of Camino Lakes Community, voiced concern about the attractiveness of the community, the increase of vehicular traffic with the advent of the new crossing and with other resulting safety problems (See Joint Exhibits 1, 2 and 3). Other citizens residing in the area west of the Railway's mainline tracks along the existing Southwest 18th Street (Camino Real Community) appeared and opposed the application. This group generally opposed the application on the basis that the crossing would have an adverse impact on street improvements in the immediate area adjoining their residences. Southwest 18th Street is designated in the West Palm Beach Urban Area Transportation Study (WPBUATS) as a major east/west arterial serving the southern quadrant of the City and Palm Beach County. WPBUATS is the basic transportation planning document in Palm Peach County (Applicant's Exhibits 4A, 4B, 5A and 5B are exhibits designating the studies conducted during the 1960's with the projection of traffic studies from 1985 with updates through the year 2000). The Applicant recognized in 1965, as did the Department of Transportation in 1968, that there existed a great need for a major route at Southwest 18th Street. To handle the traffic flow, the City designated Southwest 18th Street as a major arterial route in 1965. Interstate 95 was completed and opened for traffic during calendar year 1977. During September of 1977, the City Council proposed a bond issue which was approved by the electorate, including $800,000 set aside for the Southwest 18th Street bridge and a railroad crossing at that site. Existing available data revealed that all existing crossings within the immediate vicinity are either operating at capacity or over capacity, and that it is impossible to construct an above-grade crossing at Southwest 18th Street due to cost factors. John Carroll, the City Engineer since September of 1977, has approximately twenty-two years of experience in traffic engineering, highway design and traffic impact studies. Mr. Carroll was received as an expert in traffic related matters. Mr. Carroll testified that if the Southwest 18th Street crossing application is not granted, traffic will necessarily be shifted to other areas and that Southwest 18th Street could not function as proposed due to the manner in which traffic flows into the area. Carroll testified that there would be an approximate four minute reduction in travel time if the Southwest 18th Street crossing is approved, and that gas consumption could be reduced by approximately 500 gallons per day by the area motorists. Additionally, he testified that emergency vehicle response time would be reduced by the opening of the Southwest 18th Street crossing. According to Carroll's data, the traffic count for Camino Real during April 20, 1978, was approximately 17,000 vehicles per day, and that volume capacity for the area was 18,000 vehicles per day. He testified that area growth figures reveal that the average annual traffic increase is 16 percent. This, according to Mr. Carroll, shows that by April, 1979, the traffic flow will be beyond the peak for the area. Mr. Carroll testified that an engineering firm (Kimley-Horn and Associates) was engaged to study the feasibility and design of the proposed 18th Street's southwest crossing. Based on the study completed by Kimley-Horn and Associates, witnesses Carroll and Joe Pollack, an engineer from the firm of Kimley-Horn and Associates, concluded that the improvements engineered into the design of the Southwest 18th Street area would correct any alignment problems and solve the additional increase in traffic load for the area (See Exhibit 7). Mr. Pollack testified that in designing the Southwest 18th Street proposed crossing, Kimley-Horn and Associates considered the following factors: Traffic; Grade and elevation; Existing railroad crossings; Protective devices and signalization; and Traffic signals. He concluded that based on the study as presented by Kimley-Horn and Associates, the proposed crossing would reduce the likelihood of accidents. By reducing overflow traffic and by use of maximum signalization, including flashing lights coordinated with traffic signals along the roadway, gates, bells, and cantilevered lights with motion sensors, the proposed crossing, according to Mr. Pollack, would be a safe and efficiently designed crossing. Mr. E. H. McLaughlin, an employee of the Railway since approximately April of 1955 and presently a Trainmaster since 1971, is a qualified locomotive engineer. Mr. McLaughlin testified that the most prevalent problem that would face motorists if the proposed application is granted, would be that of a lack of visibility by the train engineers, to see motorists approaching from the south. Mr. McLaughlin testified that the proposed crossing is situated on the Railway's mainline and that approximately eighteen trains use the line daily. Mr. Frank Stuart, an employee of the Railway since 1955, is presently the manager of insurance and safety for the Railway. Mr. Stuart testified that if the proposed application is in fact granted, he would recommend as a safety supervisor that the crossing use safety devices consisting of flashing lights, gates, bells, cantilevered lights and motion sensors. He further recommended that no holding (storing) facilities be situated near the crossing. Mr. Stuart guesstimated the cost for the signalization required at approximately $54,000 excluding the motion sensors and site preparation. Mr. Joseph Rice, a Registered Professional Engineer and a consultant for the Railway, was called as expert witness to testify respecting the Railway's position. Mr. Rice testified that in his opinion the vehicular figures cited in the WPBUATS studies are too high; however, he was of the opinion that using the most realistic figures, all studies showed that the road (Southwest 18th Street) would necessarily have to be upgraded. Mr. Rice recommended that if the crossing is permitted, that maximum signalization be utilized at the crossing. Mr. Rice also conceded during cross-examination that staged construction was a good idea for a municipality to engage in to complement its overall growth. Although he was of the opinion that there were alternative routes available, he could not be specific as to whether or not there were feasible alternatives to the proposed crossing. Jeffrey DuBois, a District Coordinator in the Fourth District for the Department of Transportation, testified that a conference committee was conducted with respect to the subject crossing and that the conference recommended that if the application for the subject crossing is granted, cantilevered lights, gates, bells and flashing lights be used as signalization for the proposed crossing.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby, RECOMMENDED: That the application of the City of Boca Raton to open an at-grade crossing at Southwest 18th Street (milepost 326 + 100') be GRANTED. RECOMMENDED this 25th day of June, 1979, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of June, 1979.

Florida Laws (1) 120.57
# 9
FLORIDA EAST COAST RAILWAY COMPANY, ET AL. vs. CITY OF MIAMI AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-001529 (1981)
Division of Administrative Hearings, Florida Number: 81-001529 Latest Update: Apr. 12, 1982

Findings Of Fact The railroad crossing which is the subject of this proceeding is crossing number 272626-E, in the City of Miami, Florida. Its location at N.E. 55th Terrace is approximately 500 feet north of an existing crossing located at N.E. 54th Street, and roughly 1100 feet south of another crossing located at N.E. 59th Street. The Railway's rationale for seeking to close the N.E. 55th Terrace crossing is that these other two nearby crossings offer practical alternate routes to the N.E. 55th Terrace crossing, and can provide adequate access to the area for the public and emergency services. The City's opposition is based on its contention that closure of the N.E. 55th Terrace crossing would adversely affect emergency access to the area, which has experienced substantial growth in population due to the influx of refugees. The Department of Transportation supports the closing of the subject crossing, contending that N.E. 55th Terrace is not a thoroughfare and that it has a low volume of vehicular traffic, and because of its proximity to other crossings. The section of the Florida East Coast Railway involved in this proceeding runs from N.E. 79th Street to Biscayne Boulevard, a distance of approximately five miles. There are approximately 30 crossings now in existence over this section of the railroad's track. The principal justification for the closure of the N.E. 55th Terrace crossing is its proximity to the other crossings located at N.E. 54th Street and at N.E. 59th Street, and the resulting improvement in safety for vehicular traffic and railroad equipment. Removal of the subject crossing should eliminate vehicular accidents on the tracks, and eliminate upkeep and maintenance expenses caused by frequent vandalism at the N.E. 55th Terrace crossing location. In addition, closure will eliminate one sounding of the train whistle between N.E. 59th Street and N.E. 54th Street. The present signal device at the N.E. 55th Terrace crossing is of an old-type steel construction with a cast iron crossbuck on a concrete-type foundation. Because it is of steel construction, it is hard to maintain in a salt climate. This device is approximately 25 years old and has to be maintained by a pole line which is about 30 years old. It will have to be replaced within two years unless the application is granted and the crossing closed, at a cost of approximately $42,266. This signal device has been the subject of vandalism, requiring replacement of two bond wires within the last three months. On other occasions the lens and bulb were broken out. During the months of August, September and October, 1981, there were four instances when repairs were required at the subject crossing due to vandalism, the frequency of which is higher in this area than at other points in Miami. The crossing at N.E. 55th Terrace does not connect directly with Biscayne Boulevard. It is not an arterial road but is a collector or service road providing access to adjacent properties. There are alternative roads in the area which carry most of the large volume of traffic. Less than 500 vehicles a day use the N.E. 55th Terrace crossing, while approximately 12,000 vehicles a day use the N.E. 54th Street crossing. The movement of fire, police and other emergency vehicles would not be impeded by closing of the N.E. 55th Terrace crossing, since other crossings are readily available and offer better access and quicker response time than N.E. 55th Terrace. Police or fire vehicles moving over the N.E. 55th Terrace crossing must travel over a circuitous route because N.E. 55th Terrace is not a continuous street. In addition, closure of the subject crossing would remove an existing conflict point (a point where the path of any vehicle is interrupted by another vehicle), which is beneficial from a safety standpoint. Finally, any population growth in the area will have adequate transportation over N.E. 54th Street and N.E. 59th Street, and will not require the use of the N.E. 55th Terrace crossing. Consequently, there will be a negligible impact upon traffic over the crossings at N.E. 54th Street and N.E. 59th Street by closure of the N.E. 55th Terrace crossing.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the application of Florida East Coast Railway Company to close the at-grade railroad crossing at N.E. 55th Terrace in Miami, Florida, be granted. THIS RECOMMENDED ORDER entered on this 17th day of March, 1982, in Tallahassee, Florida. WILLIAM B. THOMAS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of March, 1982. COPIES FURNISHED: Charles B. Evans, Esquire One Malaga Street St. Augustine, Florida 32084 Terry V. Percy, Esquire 174 East Flagler Street Miami, Florida 33131 Charles G. Gardner, Esquire 562 Haydon Burns Building Tallahassee, Florida 32301

Florida Laws (1) 120.57
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer