The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).
Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.
Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177
The Issue Whether a consumptive use permit for the quantities of water requested in the application should be granted.
Findings Of Fact Application 7500137 seeks an average daily withdrawal of 2.4 million gallons of water with maximum daily withdrawal not more than 2.88 million gallons from an existing well in order to process phosphate and reclaim land. This is an existing use for mining operations located southwest of Lakeland, Florida, on land consisting of 1531 acres. Notice was published in a newspaper of general circulation, to wit: The Lakeland Ledger, on November 11 & 18, 1975, pursuant to Section 373.146, Florida Statutes. The application and affidavit of publication were admitted into evidence without objection as Composite Exhibit 1, together with correspondence from James R. Brown, Vice President, Dagus Engineers, Inc., dated November 19, 1975 to the Southwest Florida Water Management District. No objections were received by the Water Management District as to the application. Mr. George Szell, hydrologist of the Water Management District testified that the application met the conditions for a consumptive use permit as set forth in Chapter 16J-2.11, Florida Administrative Code, except that the quantity of water requested to be withdrawn is 41.06 per cent over the maximum average daily withdrawal permitted under the water crop theory as set forth in Section 16J-2.11(3), F.A.C. However, the Water Management District witness recommended waiver of that provision since the mining operations will be concluded in several years and thereafter the water table and hydrologic conditions will return to normal. The Water District staff recommended approval of the application with the condition that a meter be installed on the well and that the applicant be required to take monthly readings thereof and submit quarterly reports of the readings to the District. The applicant's representative agreed to these conditions at the hearing.
Recommendation It is recommended that Application No. 7500137 submitted by Poseidon Mines, Inc., for a consumptive water use permit be granted on the condition that a meter be installed on the applicant's well and that monthly readings be taken and submitted quarterly by the applicant to the Southwest Florida Water Management District. It is further recommended that the Board of Governors of the Southwest Florida Water Management District, pursuant to Rule 16J-2.11(5), for good cause, grant an exception to the provisions of Rule 16J-2.11(3), as being consistent with the public interest. DONE and ENTERED this 19th day of January, 1976, in Tallahassee, Florida. THOMAS C. OLDHAM Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: J.T. Ahern, Staff Attorney Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Poseidon Mines, Inc. P.O. Box 5172 Bartow, Florida
Findings Of Fact The subject applications request permits from the Central and Southern Florida Flood Control District (FCD) for the agricultural irrigation and drainage of 1,780 acres of citrus lands. Received into evidence without objection were the public notices of hearing appearing in The News Tribune, Fort Pierce, Florida, and The Stuart News, Stuart, Florida; the three permit applications submitted on behalf of Kay-One Grove, Ltd., and the Revised Staff Report of the FCD. The amount of water requested by the applications is 2,670 acre-feet per year with a maximum monthly withdrawal of 600 acre-feet. The Revised Staff Report, prepared by Doug Winter, a Civil Engineer with the Hydrology Division of the FCD, recommended an annual allocation of 1,619.8 acre-feet with a maximum monthly withdrawal of 574.8 acre-feet. This Report is attached hereto. Mr. Kenneth Harris, a consulting engineer for Kay-One Grove, Ltd., gave a summation of the applications and corrected page 1 of the Revised Staff Report, under the first paragraph of "A", to change "Township 37 South" to "Township 38 South". The summation was substantially the same as that set forth on pages 1 and 2 of the Revised Staff Report. The existing facilities were also represented to be as set forth in the FCD Report. Mr. Doug Winter testified that he evaluated the subject applications and prepared the Revised Staff Report, and testified as to its contents. As to the drainage aspects of the applications, Mr. Winter testified that there would be no adverse effect on the receiving water body since the drainage capacity of the applicant's land is within the FCD's limitations. As to the agricultural uses of the water, Mr. Winter used three criteria to determine the appropriate allocation. These three criteria were the adjusted basin yield, the supplemental crop requirement for citrus and the quantity requested by the applicant. The allocation is normally the lesser of these three quantities. It was determined that the adjusted basin yield was the limiting criteria and the amount of water available for annual allocation is 10.92 inches per acre per year for the C-23 basin, which equates over the applicant's 1,780 acres to be 1,619.8 acre-feet. The FCD uses this 10.92 figure for all allocations within the C-23 basin. The maximum monthly pumpage figure based on the amount of water which would be needed in the driest month to offset a 2 in 10 year drought, modified by an 80 percent application efficiency, was determined to be 3.875 inches par acre per month, or 574.8 acre-feet or 187.3 million gallons for the entire tract of 1,780 acres. This is in contrast to the 4.0 inches per acre maximum monthly withdrawal requested by the applicant, which would equate to 600 acre-feet. As to the use of ground water from three wells located on the property, Mr. Winter determined that the allocation would be the same as for the C-23 withdrawals since the recharge of these wells would be the same as the recharge of the surface water source. Mr. Winter then reiterated the conclusions and recommendations set forth in the Revised Staff Report. It was recommended that a water use permit be issued pursuant to Application Numbers 23238 and 22046 for an annual allocation of surface water and/or ground water in the amount of 1,619.8 acre-feet, which represents 10.92 inches per acre per year, with the condition that the maximum monthly withdrawal of surface water and ground water for the combination of the two not exceed 187.3 million gallons (which represents 3.875 inches per acre or 574 acre-feet) during times of adequate water level or moderate drought conditions. Should severe drought conditions occur, the FCD will issue an order requiring a reduction of water withdrawal rates based on a water shortage plan developed by the FCD. It was recommended that a surface water management permit be issued pursuant to Application No. 22039 for the operation of a system consisting of ditches, dikes, pumps and culverts as described in the application with the conditions set forth on page 11 of the Revised Staff Report. Finally, it was recommended that a right-of-way permit be issued authorizing a 48 inch culvert connection through the FCD's south right-of-way of C-23 adjacent to Project Culvert 15 and the use of Project Culvert 13. Mr. Harris then sought a clarification of the maximum monthly pumpage amount and was assured that the applicant could apply for emergency authorization of further withdrawals under the FCD's rules and regulations, provided extreme drought conditions were not existent. It was explained that the monthly quantity allowed here, the 3.875 inches, was based on reports of the average rainfall for the Fort Pierce area and the crop requirements. The Hearing Officer then asked Mr. Harris to explain his objections, if any, to the Revised Staff Report. Mr. Harris explained that the difference between the amount of water requested and that received in the Report is small, less than 10 percent. His only other objection was to the maximum allowable runoff figure. He would like this to be increased from the recommended 2.2 inches to 4 inches. It was explained that the allowable figure is based upon the maximum capacity of the canal. Mr. Harris stated that the applicant would probably make further application for additional run-off in the future.
Recommendation Based upon the above findings of fact and conclusions of law, it is recommended that the permits requested and the right-of-way permit be issued in accordance with the recommendations set forth on pages 9 through 11 of the attached Revised Staff Report. Respectfully submitted this 7th day of October, 1975, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Mr. E.D. Holcomb, Jr. General Manager Kay-One Grove, Ltd. Post Office Box 1120 Fort Pierce, Florida 33450 Stephen A. Walker, Esquire Attorney for the Central and Southern Florida Flood Control District Post Office Box V West Palm Beach, Florida
Findings Of Fact Respondent Communities Financial Corporation is a Florida corporation engaged in the subdivision and sale of real property. In 1971 CFC purchased approximately twenty-two sections, or 22 square miles, of real property ("the land") in Township 34 South, Range 33 East, Okeechobee County, Florida, which it proposed to sell as individual one-and-one-quarter (1-1/4) acre lots. The subsequent development of that land is the subject of this proceeding. Respondent Coquina Water Management District ("Coquina") was organized pursuant to Chapter 298, Florida Statutes, by judgment of the Circuit Court for Okeechobee County, Florida to perform drainage activities on the land. The land which CFC purchased in 1971 was originally platted in 1912 in a grid system with roads, drainage canals, and ditches. Extensive drainage was required for use of the land because it was very flat and had a high water table. Approximately one-half of the land was subject to flooding. After it was originally platted it was utilized for cattle ranching with drainage ditches connecting the low areas to encourage runoff. Ten-acre tracts surrounded by dikes and two to three foot deep ditches were used for tomato farming. Such agricultural ditching covered approximately 15 square miles of the property. At one time a hotel was situated on a portion of the property. North-South and East-West roads and a 5,000-foot airstrip were constructed across the property. The East-West road along the South boundary of the property, which is now a state road, has an adjacent drainage ditch which received ranchland water runoff from property east of the land. In 1971 and 1972 CFC registered the platted lots for sale with the Division of Florida Land Sales and Condominiums ("Land Sales") of the State of Florida Department of Business Regulation. In the normal course of compiling the documentation to be submitted for registration, CFC contacted several state regulatory agencies to determine whether such agencies required CFC to obtain permits for development of the property. CFC provided those agencies copies of its drainage plans, which included roads, swales, canals, and control structures. The State of Florida Department of Natural Resources ("DNR") stated that the construction of improvements as planned in the development would not be subject to that agency's jurisdiction for purposes of a dredge and/or fill permit. The State of Florida Department of Pollution Control ("DPC"), predecessor of DER, first stated in a letter of October 4, 1971, to Mr. Moseley Collins, who submitted a "plan of reclamation to DPC, that it had no regulatory responsibilities over the project: In response to your request for comments this Department has conducted a preliminary review of the proposed plan. We have no basic objections to the overall plan of development and believe it could be platted as shown. Specific details as to drainage techniques will be reviewed at a latter [sic] date. It is brought to you [sic] attention that although we have no regulatory responsibili- ties in this area we will welcome the opportunity to review cross sections and details at a latter [sic] date. We thank you for the opportunity to review a project of this magnitude at an early date. [Emphasis added.] The DPC, in a letter of March 30, 1972, to Collins, also observed that: This Department has conducted a review of the revised plan for the subject project and endorse the approach that you are contemplating in developing these areas. I have coordinated with other agencies and organizations and they concur with the approach. We would like to review the project at a future date to deter- mine the method of construction of the swales or greenways to move the water from one lake to another through the complete watershed area. You and your client are to be commended on this approach. From the preliminary layout you can see the possibilities for the potential develop- ment of an area for residential usage that will retain a large percentage of the natural resources and minimize the downstream effect on the overall watershed. Please advise when you want to review the project in greater detail. [Emphasis added.] In connection with the registration of the development, CFC submitted to Land Sales the above-referenced letters from DNR and DPC, detailed evidence of the proposed plan of development, and a public offering statement for use in solicitation of lot sales from the general public. Each offering statement contains several statements to the effect that "this is not a homesite subdivision." Land Sales approved use of the offering statement. In using it to solicit sales, CFC committed to the purchasers that it would complete the required road and drainage improvements by December 31, 1979. CFC commenced sales of lots in the development in 1971. The Agreements for Deed approved by Land Sales and subsequently entered into by CFC with lot purchasers required CFC to deliver improved lots by December 31, 1979. Most of the land sales were made between 1971 and 1973. (6,412 lots were sold and 1,146 were conveyed by June 23, 1977.) Approximately eighty percent of the lots have been sold to date. Up to one-half of the approximately nine thousand lot purchasers hold legal title to their lots pursuant to deeds issued to them by CFC upon full payment. CFC began construction of the promised improvements, consisting of roads and drainage, in 1972. At the present time approximately $1,000,000 of improvements have been completed and approximately $750,000 remain to be completed. In 1973 or 1974, CFC and Coquina submitted plans for the surface water management system which CFC proposed to construct for the property to the South Florida Water Management District ("SFWMD"). The initial plan of development called for the construction of a road and canal system. At the request of SFWMD, the plan was subsequently changed to a road and swale system, and the configuration of one of the control structures was changed. The design changes resulted in more water retention on the property and the preservation of sensitive areas. After several years of analysis and review of the design plan, inspection of the project site, and a public hearing, SFWMD granted conceptual approval for the surface water management system to be constructed by CFC in 1977. The conceptual approval was partially based on the SFWMD staff's assessment than pollutant loadings from the property after development would be less than existing loadings, and that adverse water quality impacts as a result of the proposed development were unlikely. The 1977 SFWMD conceptual approval of the drainage plan for the development was followed by the issuance of a construction permit for the westernmost seven sections on March 15, 1979. Throughout this period construction was continuing. The drainage system as approved consists of grassed lot, roadside, and collector "swales" together with a retention area comprised of natural wetlands in the area of the property known as Ash Slough. The volume of water leaving the property after development will be the same as that leaving the property before development. The drainage conveyances are designed with gradually sloping sides, vary to widths of over 100 feet for the larger collector conveyances, and have depths varying from 2 feet for the "lateral" swales to 3 feet for the larger collector swales. The groundwater table in the area of the project site varies from zero to approximately 30 inches below ground surface. The swales were designed at the request of SFWMD in lieu of the canals proposed within the same easements in the original drainage plan for the development. It appears from the evidence that these drainage conveyances are designed so as to contain contiguous areas of standing or flowing water only following the occurrence of rainfall or flooding. Although some testimony indicated that these conveyances contained contiguous areas of standing water, these observations were made either at isolated times during the progress of construction or soon after a major hurricane passed through the area. Since the purpose of the "swales" is to facilitate drainage from the property, it would appear necessary from an engineering viewpoint to allow some period of time after construction of the swales for them to stabilize to make a valid determination that they will not function as designed. Accordingly, it would not appear unusual that the swales contain areas of standing water until they have been given ample opportunity to stabilize. On the basis of the record in this proceeding, a determination simply cannot be made at this point in time that the swales will not function as designed. Following DPC's initial determination of no jurisdiction in 1971 and 1972, it and DER, its successor agency, were not involved with the project until 1974, when DPC received an inquiry concerning land sales matters from the U.S. Department of Housing and Urban Development. In 1975, a DER staff member conducted a critical review of the Project and filed an internal memorandum faulting the project on the same essential grounds that are the basis for the Notice of Violation issued June 1, 1979. DER representatives participated in various SFWMD meetings from 1975 to 1977 when the conceptual approval of the drainage plan for the project was discussed. During this period, SFWMD forwarded copies of various materials dealing with the project to DER. Further, a DER representative attended the public hearing on September 8, 1977, when the conceptual approval of the project was granted by SFWMD. Respondents' first indication of DER's renewed interest in the development was a letter from DER Subdistrict Manager Warren Strahm to Robert Birenbaum on June 23, 1977. This letter stated, in part, that: The above referenced application/staff report has been supplied to this office by the South Florida Water Management District (SFWMD). It has been determined that your project is subject to Chapters 403 and/or 253, Florida Statutes. A review of drainage plans by our staff indicates the referenced project will comply with Chapter 403, Florida Statutes permit requirements for pollutant discharge. Since these plans have been incorporated into the SFWMD permit, no discharge permit or monitoring in addition to SFWMD permit requirement will be required by the Department at this time. It appears, however, that the referenced project may fall within the permitting requirements set forth in Chapter 17-4, Florida Administrative Code. Pursuant to F.A.C. 17-4.28(2) should any excavation take place in submerged lands or within the transitional zone of submerged lands, dredge and fill permits will be required by this Department prior to commencement of said activi- ties. [Emphasis added.] Please contact Mr. Roger G. Gallop, at the Fort Pierce Branch Office, telephone (305) 464-8525, at your convenience in order to discuss the need for a construction dredge and fill permit. Thank you for your cooperation. Three months later, in a letter from James Brindell to Coquina, Respondents were notified that: A review, by this agency, of the plans associated with your Surface Water Management Permit Applica- tion No. 02187-A indicates that permits will be required from the Department of Environmental Regulation pursuant to Chapter 403 and/or Chapter 253, Florida Statutes for the construction con- templated. Specifically, permits will be required for the construction and operation of discharge structures as well as for any dredging and/or filling in the waters of the state including the submerged lands and transitional zone of these submerged lands. Additionally, certification pursuant to section 401 of F.L. 92-500 may be required. Formal or conceptual appova1 of your project by the South Florida Water Management District does not imply that your project will satisfy the requirements of this agency. Please contact Mr. Warren G. Strahm, Subdistrict Manager, 3301 Gun Club Road, West Palm Beach, phone 305/689-5800, at your earliest convenience concerning application for these permits. (Emphasis added). This letter was followed one-and-one-half months later by a "Letter of Notice" from DER advising Respondents that DER had reason to believe the project was in violation of Chapter 403, Florida Statutes, and requesting CFC to cease any further work. Throughout this series of correspondence, CFC and Coquina maintained that DER did not have permit jurisdiction. This position was reasserted in a letter of November 1, 1977, from Emerson Allsworth, counsel for Coquina, to DER. During this period, numerous meetings were held involving representatives of Respondents and DER in which Respondents were urged by DER to apply for permits. Respondents failed to do so, and, on June 1, 1979, DER issued its Notice of Violation. Natural drainage from the property occurs southwestward into an area known as Ash Slough; southward from the central portion of the property into Gore Slough; and from the northeast section of the property into Company Slough. The headwaters of both Ash Slough and Gore Slough originate on the project site and periodically extend off Respondents' property to the south to join the waters of Chandler Slough. Chandler Slough, in turn, eventually empties into Lake Okeechobee 11 to 15 miles from the property. Company Slough also extends off the project site eastward onto the lands of others. There is, however, insufficient evidence in this record from which to conclude that Company Slough regularly exchanges flow with any other body of water. A "slough", as that term is used in the context of this proceeding, is a surface conveyance pathway for waters whose lateral boundaries are not as well-defined as a stream bed, and whose rate of flow is relatively slow. Due to the flat topography of the project site, Ash, Gore and Company Sloughs have imprecise boundaries, and their rates of flow appear to range at various times from very slow to nonexistent. By Cease and Desist Order dated March 28, 1978, the United States Army Corps of Engineers required Respondents to halt any further work then being conducted on the project, asserting that work in progress at that time was being conducted in waters of the United States, including adjacent wetlands, without first having acquired a permit from the Corps of Engineers. This Order provided, in part, that: Section 301(a) of the [Federal Water Pollution Control Act Amendments of 1972] makes it unlawful to discharge dredged or fill material into waters of the United States unless author- ized by a Section 404 permit issued by the Secretary of the Army acting through the Chief of Engineers. Section 10 of the River and Harbor Act of 1899 prohibits the excavation or depositing of material or erecting any struc- tures in navigable waters of the United States unless authorized by a Department of the Army permit. The work referred to in the paragraph above is deemed to have occurred in waters subject to these statutory requirements without the requisite permits and is considered unlaw- ful by this office. Prior to 25 July, the Corps of Engineers limited the requirement for Section 404 type permits to areas either below the mean high water line in tidal areas or below the ordinary high water line of rivers and streams which either now sup- port, had supported, or were capable of supporting interstate commerce. However, on 25 July 1975, the regulatory juris- diction of the District was expanded to all waters of the United States and adjacent wetlands. [Emphasis add.] Subsequently, however, by memorandum dated May 17, 1978, the United States Army Corps of Engineers determined that it did not have jurisdiction over Respondent's activities for the following reasons: In the northeast and eastern portion of the tract the flagponds and saw grass prairies are isolated with no discernible drainage sloughs or patterns. The other area of concern, in the south west sector, contains isolated ponds and an old man-made drainage canal that comprises shallow, intermittent potholes above the natural headwaters of Ash and Gore Sloughs. There was no recognizable flow in any part of the canal and the point at which average annual flow appear to be 5 c.f.s. or greater is located to the south a considerable distance from the subject tract. The project, as proposed, will not destroy or threaten any endangered species or their habitat nor adversely impact water quality of the ultimate receiving waters in Kissimmee River and Lake Okeechobee. In 1971, the Soil Conservation Service of the United States Department of Agriculture classified Ash and Gore Sloughs, as well as Fish Slough, to which Company Slough is alleged by DER to connect, as "intermittent". This determination is supported by hydrological data compiled by the South Florida Water Management District which shows no net flow in Chandler Slough for as many as six months in 1975 and four months in 1976. In the South Florida Water Management District report concerning flow patterns in Chandler Slough, it was pointed out that: The climate in this portion of Florida is subtropical with warm summers and moderate winters. Rainfall is seasonal with about 75 percent of the total occur- ring in a well-defined wet season, from May to October. This distribution of rainfall results in considerable surface water flow during part of the year. During the late winter and early spring many of the creeks and sloughs, such as Chandler Slough, become completely dry. [Emphasis added.] In addition, testimony in the record in this proceeding establishes that on at least one occasion during the time in which construction on the property was being conducted, Company Slough was completely dry. There is no data in the record quantifying the annual flow of water from Ash and Gore Sloughs into Chandler Slough. Further, there is no evidence concerning the periodicity of any such water exchanges between Ash and Gore Sloughs and Chandler Slough. As indicated above, the evidence establishes that Chandler Slough, which is the larger collector slough into which both Ash and Gore sloughs allegedly discharge, periodically becomes "completely dry." DER witnesses testified that they had observed contiguous areas of standing water in Ash, Gore and Company Sloughs during visits to the site, and had also determined the existence of an exchange of waters between Ash, Gore and Company Sloughs with other sloughs connecting to Chandler Slough by analyzing aerial photographs. However, those aerial photographs were not made a part of the record in this proceeding. Additionally, the relatively few visits to the site by these witnesses, in the absence of validly derived data establishing pertinent flow rates, is insufficient to establish "normal" conditions in the area. This is especially true in light of the aforementioned countervailing determinations based upon data compiled by the United States Army Corps of Engineers, the United States Department of Agriculture and the South Florida Water Management District. The evidence shows that some of the types of vegetation listed in DER's vegetation indices by which DER determines whether areas are "submerged lands" or "transitional zones" of submerged lands have been found on the project site. Among the types of vegetation observed in and around Ash, Gore and Company Sloughs are maidencane, water willow, pickerelweed, button bush, saw grass and St. John's wort. Although these species were detected in some locations by visual observation, apparently no attempt was made to quantify these plants vis-a-vis other vegetative types, nor were any physical measurements made to locate their boundaries. In a report dated August 26, 1977, the SFWMD attempted to identify the acreage, but not boundaries, of wetlands on the development site. The findings of that report show that approximately 2,014 of 14,080 acres, or 14.3 percent of the total site, contains wetlands vegetation. The report also indicates that the wetlands vegetation is scattered in different locations over the site, with the median occurrence being 68 acres per 640-acre section. DER presented quantified evidence showing turbidity readings in the Ash Slough area of the development during the construction of swales in August, 1979, of 325 Jackson Units and November and December, 1979, of 155 and 176 Jackson Units, respectively. It should be noted that these readings were performed after the filing of the Notice of Violation herein. Although samples of August 6, 1979, were taken without a background sample in Ash Slough, the evidence establishes that background readings in Ash Slough were less than 25 Jackson Units. The evidence clearly establishes that DER's water quality sampling and analysis were conducted in accordance with applicable requirements of Chapter 17, Florida Administrative Code. The evidence establishes that these readings are attributable to construction of swales and control structures and would not be expected to continue after completion of construction. There is no evidence to show the duration of the discharges resulting in these turbidity readings, nor is there any showing of actual damage to animal, plant or aquatic life. Petitioner and Respondent have submitted proposed findings of fact in this proceeding. To the extent that those findings of fact are not adopted in this Recommended Order, they have been specifically rejected as being either irrelevant to the issues in this cause, or as not having been supported by the evidence.
Findings Of Fact Based upon the above testimony and the exhibits received into evidence in this cause, the undersigned Hearing Officer makes the following findings of fact with regard to the issue in dispute: The applicants, as owners and lessees of 3,300 acres of land to be used for sugar cane production, propose to install a surface water management system consisting of levees, ditches, culverts, and pumps for drainage and irrigation purposes. Irrigation will be drawn from and drainage water will be discharged into Canal 51, a project works of the FCD. There is no dispute between the applicant and the FCD staff concerning the permit for water use and connection to C-51. The applicant proposes to discharge, via two 30,000 gallon per minute pumps, one inch per acre per day or 62,239 gallons per minute into C-51. The soils on the applicants' land are primarily muck types which are high in organic nitrogen. A water level of three feet below ground level, as proposed, will probably cause such nitrogen in the muck soil to decompose, resulting in soil subsidence and production of inorganic nitrogen. Nutrients (primarily nitrogen and phosphorus) resulting from muck decomposition and crop fertilization may enter the water in the interior canals and cause such water to have a higher nutrient content. The water in Canal 51 now has low concentrations of nutrients, as compared with the waters in canals appurtenant to other sugar cane producing areas. There appear to be unique hydrological conditions on the land in question which may keep the drainage system flushed and nitrate-free and there is evidence that sawgrass areas act as an effective nutrient filter. There was no evidence that additional nutrients entering C-51 would be environmentally harmful or degrading to the waters in C-51, both parties admitting that further research and scientific data is needed to determine the safe level of nutrients in this area. The applicants and other interested groups have shown that the construction. and operation of a retention or impoundment area would cause an adverse economic impact upon landowners and would have an adverse economic effect upon consumers, the general labor force and the community. The FCD has not adequately demonstrated that the waters of C-51 would be degraded by the applicants' proposed project or that a 140 acre impoundment area would be a reasonable condition to impose upon the issuance of the permits in question. A water quality monitoring system, such as proposed in the original and revised staff reports, will permit the parties to determine whether the water in C-51 is being degraded by the addition of nutrients.
Recommendation Based upon the above cited testimony, evidence, findings of fact and conclusions off law, the following recommendations are made: It is recommended that a water use permit, a Surface water management permit and a right-of-way occupancy permit be issued, all in accordance with the recommendations and conditions set forth in the original Staff Report dated August 5, 1975, attached hereto as Exhibit A. It is recommended that the additional requirement of a 140-acre retention area set forth in the Revised Staff Report be rejected. It is further recommended that an additional condition be attached to the surface water management permit. That condition would be to have such permit expire at the same time as the water use permit; to wit: July 15, 1977, so as to allow the FCD and the applicants sufficient time to collect further data on the effect of nutrients on the waters of C-51 and compare said data with the information derived from the monitoring program required under the permits. If such data and comparisons sufficiently demonstrate that the waters of C-51 will be degraded by the applicants' project, a retention area requirement would then be a reasonable condition to the reissuance of a permit. Respectfully submitted and entered this 20th day of October, 1975, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: George H. Bailey, Esquire JONES, PAINE & FOSTER, P.A. 601 Flagler Drive Court Post Office Drawer E West Palm Beach, Florida 33402 John Wheeler, Esquire Attorney for the Central and Southern Florida Flood Control District Post Office Box V West Palm Beach, Florida =================================================================
Findings Of Fact By application number 21312, the applicant seeks a ten year water use permit for a total annual diversion of 3,831 million gallons to provide water and sewer services to an area containing approximately 7,300 acres. In September of 1969, the Florida Public Service Commission granted the applicant certificates of convenience and necessity. The existing facilities of the applicant include nine wells and an average capacity of 700 gallons per minute each. Based upon historical data and taking into accourt the reduction of construction in the service area, the projected 1984 water demand is 375 gallons per day per unit. This is equivalent to an average of 150 gallons per day per person, using a figure of 2.5 persons per living unit. The ultimate estimated population is to be 70,000 to 80,000 people with 28,000 to 32,000 living units. Based upon the average capacities of the wells, in order to meet the projected demand a total number of 22 or 23 wells will be required. This includes the nine existing wells, eleven proposed wells with the same 700 gallon per minute average and a fifteen percent standby capability of two or three additional wells. Rather than the total number of wells utilized -- 22 or 23, -- what is important is the total gallon per minute capacity of 15,400. An allocation based on this data would be equal to the applicant's requested annual maximum diversion of 3,831 million gallons and a daily maximum diversion of 18.37 million gallons. The requested diversion presents no threat of salt water intrusion. The proposed well sites will create no adverse impact upon the Fort Lauderdale well fields. While there is evidence of recharge to the aquifer from runoff waters, there is insufficient data to determine the exact amount which will be returned. For this reason, the staff report's water budget calculations are conservative.
Recommendation Based upon the above findings of fact and conclusions of law, it is recommended that a ten year permit be issued to the applicant for a maximum annual diversion of 3,831 million gallons; a maximum daily diversion of 18.37 million gallons and a maximum installed field capacity of 15,400 gallons per minute, utilizing 22 or 23 wells with a capacity of 700 gallons per minute each. It is further recommended that the applicant be subject to the conditions set forth on page 5 of the staff report (Exhibit 8) concerning the submission of monthly reports of daily pumpage and actual connections or population served, conformance with health department standards of the water quality of all wells, and the installation and maintenance of an observation well and monthly reports of the data obtained therefrom. Respectively submitted and entered this 10th day of May, 1976, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 COPIES FURNISHED: Mr. John R. Maloy Executive Director Central and Southern Florida Flood Control District P.O. Box V West Palm Beach, Florida 33402 Mr. Edward B. Deutsch 350 Southern Federal Building 400 North State Road 7 Margate, Florida 33063 Mr. John Wheeler P.O. Box V West Palm Beach, Florida 33402 Attorney for the Central and Southern Florida Flood Control District