FLORIDA WILDLIFE FEDERATION vs. GORDON V. LEGGETT, MOSELEY COLLINS, ET AL., 82-002235 (1982)
Division of Administrative Hearings, Florida Number: 82-002235 Latest Update: Jun. 21, 1991

The Issue Whether the applicants own the property in question? Whether the project would comply with the criteria of the South Florida Water Management District contained in Basis of Review for Surface Water Management Systems, specifically Sections 3.1.3 and 3.2? Whether flood protection would be inadequate or septic tanks unsuitable or whether the public health and safety would be compromised or the ultimate purchasers be deprived of usage of the property due to inundation in violation of Chapter 373, Florida Statutes (1981), or Rule 40E-4.301(1), Florida Administrative Code?

Findings Of Fact Ms. Williamson and Messrs. Leggett and Collins hold in fee simple a triangular 117.24-acre parcel in Okeechobee County as tenants in common under a warranty deed executed in their favor by one W. C. Sherman. They propose to develop the property as a trailer park (complete with airstrip) large enough to accommodate 109 trailers. To this end, soil would be dug up from the center of the property and used to raise the elevation of the surrounding land above the 100-year floodplain. (T. 47) The applicants have a dredging permit from the Department of Environmental Regulation authorizing them to excavate 629,889 cubic yards. They are proposing to dig to a depth of 76 feet below ground. This would create an 18-acre body of water ("Poe's Lake") which would overflow a V-notched weir into a county canal. The county canal would take the water to C- 38, one of the large canals to which the Kissimmee River has been relegated, at a point about 18 miles upstream from Lake Okeechobee. Runoff would wash over residential lots and roadways; the site would be graded to assure drainage into Poe's Lake. The minimum road crest elevation would be 30 feet NGVD ("[a]round twenty-nine feet" T.52), as compared to the control elevation for surface waters of 28.5 feet NGVD. WATER QUALITY The developers plan septic tanks for wastewater treatment. At the close of all the evidence, counsel for the applicants stated that sanitary sewers could be installed instead. Respondents' Proposed Recommended Order, p. With all the housing units in use, at least 10,900 gallons of effluent would seep into the ground from the tanks daily. There would be some evapotranspiration, but all the chemicals dissolved in the effluent would eventually end up in the groundwater. During the dry season, septic tank effluent would cause mounding of the groundwater and some groundwater movement toward, and eventual seepage into, Poe's Lake. The eventual result would be eutrophication and the growth of algae or macrophytes on the surface of Poe's Lake. This would cause dissolved oxygen violations in Poe's Lake. Discharges from the lake would inevitably occur, aggravating the situation in C-38, which already experiences dissolved oxygen levels below 5.0 milligrams per liter in the rainy summer months. Some fraction of the nutrients in the effluent from the septic tanks would ultimately reach Lake Okeechobee itself. The sheer depth of the excavation would create another water quality problem. Under the anaerobic conditions that would obtain at the bottom of Poe's Lake, bacteria acting on naturally occurring sulfates would produce hydrogen sulfide, ammonia and various other reduced organic nitrogen compounds. These substances are toxic to human beings and would, in some indeterminate quantity, enter the groundwater from Poe's Lake. This would affect the taste and perhaps the potability of water from any well nearby. It would be "possible to design a better system where there would be nutrient removal and a greatly reduced probability of violation of the dissolved oxygen criterion and obviation of the potential for ground water contamination." (T. 200) Installation of a baffle on the weir would serve to prevent buoyant debris from entering surface waters of the state. BASIS OF REVIEW Official recognition was taken of the "Basis of Review for Surface Water Management Permit Applications Within the South Florid Water Management District," parts of which all parties agree pertain in the present proceedings. Among the criteria stated in this document are: 3.1.3 Waste and Wastewater Service - Potable water and wastewater facilities must be identified. The Applicant for a Surface Water Management Permit must provide information on how these services are to be provided. If wastewater disposal is accomplished on-site, additional information will normally be requested regarding separation of waste and storm systems. 3.2.1.4 Flood protection - Building floors shall be above the 100 year flood elevations, as determined from the most appropriate information, including Federal Flood Insurance Rate Maps. Both tidal flooding and the 100 year, 3 day storm event shall be considered in determining elevations. b. Commercial and industrial projects to be subdivided for sale are required to have installed by the permittee, as a minimum, the required water quality system for one inch of runoff detention or one half inch of runoff retention from the total developed site. State standards - Projects shall be designed so that discharges will meet State water quality standards, as set forth in Chapter 17-3, Retention/detention criteria - Retention and/or detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided for one of the three following criteria or equivalent combinations thereof . . . Wet detention volume shall be provided for the first inch of runoff from the developed project, or the total runoff from a 3-year, 1-hour rainfall event, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. Retention volume shall be provided equal to 50 percent of the above amounts computed for wet detention. 3.2.4.1 Discharge structures should include gratings for safety and maintenance purposes. The use of trash collection screens is desirable. Discharge structures shall include a "baffle" system to encourage discharge from the center of the water column rather than the top or bottom. 3.2.4.4.2 b. Control elevations should be no higher than 2 feet below the minimum road centerline elevation in the area served by the control device in order to protect the road subgrade. Simply detaining runoff before discharging it offsite will not insure that the water quality standards set forth in Chapter 17-3 will be met. Whether the standards are met depends on, among other things, the composition of the runoff. FWF'S INTEREST Among the purposes of the FWF, as stated in its charter, Shall be to further advance the cause of conservation in environmental protection, to perpetuate and conserve fish and wildlife, oil, water, clean air, other resources of the State and so manage the use of all natural resources, that this generation and posterity will receive the maximum benefit from the same. (T. 248-9) Four or five thousand Floridians belong to FWF. FWF members "make use" (T. 250) of the waters of Lake Okeechobee, the Kissimmee River and specifically of the waters in C-38. PROPOSED FINDINGS CONSIDERED The applicants and FWF filed post hearing memoranda and proposed recommended orders including proposed findings of fact which have been considered in preparation of the foregoing findings of fact. They have been adopted, in substance, for the most part. To the extent they have been rejected, they have been deemed unsupported by the weight of the evidence, immaterial, cumulative or subordinate.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That SFWMD deny the pending application for surface water management permit. DONE and ENTERED this 29th day of November, 1983, in Tallahassee, Florida. ROBERT T. BENTON II, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of November, 1983. COPIES FURNISHED: Dennis J. Powers, Esquire Gunster, Yoakley, Criser & Stewart 400 South County Road Palm Beach 33480 Terrell K. Arline, Esquire 325-C Clematis Street West Palm Beach, Florida 33401 Irene Kennedy Quincey, Esquire 3301 Gun Club Road West Palm Beach, Florida 33406 Charles P. Houston, Esquire 324 Datura Street, Suite 106 West Palm Beach, Florida 33401

Florida Laws (2) 120.57120.60 Florida Administrative Code (1) 40E-4.301
# 1
BAYSHORE HOMEOWNERS ASSOCIATION vs. GROVE ISLE, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002186 (1979)
Division of Administrative Hearings, Florida Number: 79-002186 Latest Update: Apr. 08, 1980

The Issue Has the applicant, Grove Isle, Ltd. provided reasonable assurances and affirmatively demonstrated that its proposed marina is clearly in the public interest and will not lower the existing ambient water quality of Biscayne Bay, a designated outstanding Florida water?

Findings Of Fact On March 13, 1978 an application was made to DER for a water quality control permit to construct a wet-slip marina on the west side of Grove Isle, formerly known as Fair Isle and Sailboat Key. The original plan for the marina, which was initially objected to by the Department of Environmental Regulation, was modified to protect a bed of seagrasses extending about 30 feet wide in a band along the west side of the island. While the plans were being modified and consultations with other government permitting agencies were in progress, the application was "deactivated" from September 27, 1978 until March 30, 1979. As a result of its investigation and review, DER on October 23, 1979, issued a letter of intent to grant the permit to Grove Isle, Inc. The permit if granted, would allow the applicant to construct six concrete fixed piers, five "T" shaped, one "L" shaped, with a boat docking capacity of 90 pleasure boats. The piers will extend a maximum of 165 feet offshore from an existing concrete bulkhead. The width of the piers will be 8 feet from the bulkhead to a point 41 feet offshore, and then increased to a width of 10 feet. A sewage pump-out facility is also proposed. Attached to that letter of intent were the following conditions: Adequate control shall be taken during the construction so that turbidity levels outside a 50 foot radius of the work area do not exceed 50 J.C.U's, as per Section 24-11, of the Metropolitan Dade County Code. During construction, turbidity samples shall be collected at a mid-depth twice daily at a point 50 feet up stream and at a point 50 feet down stream from the work area. The contractor shall arrange to have turbidity sample results reported to him within one hour of collection. Turbidity monitoring reports shall be submitted weekly to DER and to the Metropolitan Dade County Environmental Resources Management (MDCERM) If turbidity exceeds 50 J.C.U's beyond a 50 foot radius of the work area, turbidity curtains shall be placed around the work area and MDCERM notified immediately. Turbidity samples shall be collected according to condition two above, no later than one hour after the installation of the turbidity curtain. It turbidity levels do not drop below 50 J.C.U's within one hour of installation of the curtain all construction shall be halted. Construction shall not be resumed until the contractor has received authorization from MDCERM. No live-a-board vessels (permanent or transient) shall be docked at this facility unless direct sewage pump-out connections are provided at each live-a-board slip. A permanent pump-out station shall be installed and maintained for further removal of sewage and waste from the vessels using this facility. Compliance with this requirement will entail the applicant's contacting the Plan Review Section of MDCERM for details concerning connection to an approved disposal system. Boat traffic in the shallow 30 foot wide dense seagrass area which parallels the shoreline shall be restricted by the placement of wood piles on 6 foot centers along the entire shoreline facing the marina. The channel from this marina to deeper water in Biscayne Bay shall be marked to prevent boats from straying into adjacent shallow areas. This will prevent habitat destruction. A chemical monitoring program shall be established to determine the effect of this marina on the water quality of this section of Biscayne Bay. Surface and mid-depth samples shall be collected at three points in the project area and at one background station. Parameters shall include, but not be limited to dissolved oxygen, pH, salinity, temperature, total coliform and fecal coliform and fecal streptococci bacteria, oil and grease, biochemical oxygen demand, and turbidity. Background samples shall be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. In addition to the chemical monitoring program, a benthic community monitoring program is to be established. Samples of the benthic seagrass community within and adjacent to the project area are to be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. Should either monitoring program detect dissimilar changes at its monitoring and control stations, DER and MDCERM shall be notified of the results. The monitoring programs shall be reviewed and approved by DER and MDCERM prior to implementation. Monitoring reports shall be submitted to DER and MDCERM and the United States Corps of Engineers on regular basis. Warning signs shall be posted in the marina area to advise marina users that manatees frequent the area and caution should be taken to avoid collisions with them. With the foregoing conditions imposed, the Department concluded that no significant immediate or long term negative biological impact is anticipated and state water quality standards should not be violated as a result of the proposed construction. Grove Isle, Inc., has agreed to comply with all the conditions established by the DER letter of intent to grant the permit. Grove Isle is a spoil bank in Biscayne Bay located approximately 700 feet east of the Florida mainland. It is linked to the mainland by a two-lane concrete bridge. The island is currently under development for a 510 unit condominium community with associated facilities such as a restaurant, hotel, and the proposed marina. The island is surrounded by a concrete bulkhead constructed many years ago. No changes in the bulkhead line are proposed. Grove Isle, Inc., proposes constructing the marina on concrete piles driven into the Bay bottom from a shallow draft barge. During construction there would be some turbidity caused from the disruption of the Bay sediment. This can however be adequately controlled by the use of turbidity curtains during construction. The construction will not require any dredging or filling. In the immediate marina site the most significant biota are a 30 foot wide bed of seagrasses. There are no other important biota because at one time the area was extensively dredged to create the island. There are no oyster or clam beds nearby. While lobsters may have once frequented the area, they too are no longer present. The water depth in the area ranges from 1 foot near the island bulkhead to 12 feet offshore to the west of the island. This particular seagrass bed consist primarily of turtle grass (thalassia, testudinum) with some Cuban Shoal Weed (Halodule, Wrightii). Protection for these grasses will be provided by a buffer zone between the island and the boat slips. The grassy zone will be bordered by a row of dolphin piles to exclude boat traffic. Because the grass requires sunlight for photosynthesis and therefore life, the six piers will have grated walkways where they pass over the grass. This will allow sunlight to reach below. In addition to the small grass bed on the west of the island there are extensive beds to the northeast, east and south of the island that extend several hundred yards from the island in water depths of three to ten feet. If boat traffic in the vicinity is markedly increased due to the existence of the marina, it is conceivable that the number of propeller scars in these shallow beds could increase. At the present time the beds are already traversed by boats, some of which are owned by Petitioner's members. There are already for example, approximately 50 crafts which operate from the nearby mainland or from Pelican Canal directly to the north of the island. Propeller scars take up to fifteen years to heal yet the number of scars in the Grove Isle area is insignificant and even a tripling of them from an additional 90 boats would still be de minimus. Potential damage to the seagrasses on the north side of the island will be minimized by the planned installation of navigation markers by Grove Isle. These markers will channel boats into water of a navigable depth and lessen the number of groundings and near groundings which cause the scarring. There is evidence that pleasure boats by their very existence and operation in the water are potential pollution sources. For instance, various maintenance chemicals such as anti-fouling bottom paint and wood cleaner have the ability, if used in sufficient quantity, to harm marine life. The fueling of engines and sewage discharge from boats are additional pollution sources. There was however, no showing that the location of up to 90 pleasure and sport fishing craft at the proposed marina site would in any way cause a degradation of water quality below the acceptable standards for Class III waters. At the present time, the marina site has adequate flushing to disburse those pollutants which may be generated by the marina operations. While a hydrographic survey was not requested by DER or provided by Grove Isle at the time the permit application was made, the testimony of Dr. Echternacht at the time of the Hearing provided adequate assurances respecting the hydrographic characteristics of the proposed site. The proposed marina will have no fueling or maintenance facilities. No live-a-board craft will be allowed at the marina. Both Mr. Wm. Cleare Filer and David A. Doheny live close to Grove Isle. Mr. Doheny's residence is on the mainland facing the proposed marina site and Mr. Filer's house is on Pelican Canal. They use the waters of Biscayne Bay around Grove Isle for recreation. If the quality of the water in the proposed marina site were lessened their substantial interest would be affected. Biscayne Bay is classified as a Class III water and is in the Biscayne Bay Aquatic Preserve. Careful considerations has been given to each of the proposed findings of fact submitted by the parties. To the extent that they are not contained in this Order, they are rejected as being either not supported by competent evidence or as immaterial and irrelevant to the issues determined here.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a Final Order be entered by the State of Florida, Department of Environmental Regulation, determining that the requested water quality control permit and certification be issued subject to the conditions contained in the Notice of Intent to Issue Permit and that the Relief requested by the Petitioners be denied and their Petitions be dismissed. DONE and ENTERED this 22nd day of February, 1980, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: David A. Doheny, Esquire 1111 South Bayshore Drive Miami, Florida 33131 Wm. Cleare Filer 3095 Northwest 7th Street Miami, Florida 33125 Joel Jaffer 2479 Southwest 13th Street Miami, Florida 33145 Randall E. Denker, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Larry S. Stewart, Esquire Frates, Floyd, Pearson, Stewart, Richmond & Greer One Biscayne Tower 25th Floor Miami, Florida 33131 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION BAYSHORE HOMEOWNERS ASSOCIATION, INC., et al., Petitioner, vs. CASE NO. 79-2186 79-2324 STATE OF FLORIDA, 79-2354 DEPARTMENT OF ENVIRONMENTAL REGULATION, and GROVE ISLE, LIMITED, Respondent. /

Florida Laws (8) 120.50120.52120.57258.37258.42403.021403.087403.088
# 2
SOUTH FLORIDA WATER MANAGEMENT DISTRICT, A PUBLIC CORPORATION vs SAMUEL HUBSCHMAN AND CONNIE HUBSCHMAN, AS TRUSTEES; BOB CADENHEAD; AND CADENHEAD & SONS CONSTRUCTION, 89-005737 (1989)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Oct. 23, 1989 Number: 89-005737 Latest Update: Nov. 09, 1990

Findings Of Fact Petitioner SFWMD is a public corporation of Florida. It is charged with the responsibility of issuing permits and enforcing orders relating to surface water management within its jurisdictional boundaries. Respondents Hubschman, as trustees, have full rights of ownership in 1,280 contiguous acres located in Sections 17 and 20, Township 47 South, Range 26 East, Lee County, Florida. These lands are known as Bonita Farms I and II. They are located within the jurisdictional boundaries of SFWMD. In their pre- developed state, these lands could generally be categorized as marsh and wetlands with cypress forest and some uplands in the northern half of the project area. After deciding to develop the acreage for use as pasture and farmland for small vegetable crops, Respondents Hubschman applied for a surface water management permit from SFWMD. The purpose of the permit was to allow the construction and operation of a water management system that would serve both farms. A system was designed to drain water off both parcels through a 62-acre retention area into a natural slough system which runs water into Kehl Canal. In order to create the system, the Respondents Hubschman had the following facilities designed for the site: internal ditches, dikes, pumps, a retention area and control structures. On April 15, 1982, SFWMD issued Surface Water Management Permit No. 36- 00315-S, and Respondents Hubschman were allowed to proceed with their proposed construction plan. A modification to the permit was issued on April 14, 1983. The retention area was enlarged from 62 acres to 88 acres by relocating the perimeter dike. The outfall structure was revised in that the two pumps and the weir were to be replaced by three 18" CMP culverts that would discharge the drained water by gravity flow from the retention area through the slough into Kehl Canal. The duration of the construction phase of its permit was a three-year period, unless the construction of the permitted project discharge structure or equivalent had been completed prior to that date. After the close of the three-year period, there was a dispute between the Respondents and SFWMD as to whether the permit had expired. The controversy was resolved through a compromise agreement. An application for the reissuance of Permit No. 36-00315-S was filed on October 13, 1986. Instead of reissuing Permit No. 36-00315-S, as requested by Respondents Hubschman, SFWMD decided to issue a new permit on May 14, 1987. As part of the processing procedures, SFWMD again reviewed and approved the entire surface water management system designed to serve the 1,280 acres of land proposed by Respondents. Because the additional work proposed for Section 17, the northern section was limited at this stage of development to the selective clearing of additional upland areas to create more improved pasture, the new permit directed attention to Section 20, the southern section of the land. The new permit advised the Respondents that if they wanted to propose additional development to Section 17, they were required to seek a modification of this new permit, Surface Water Management Permit No. 36-00764-S, to include those changes. The Respondents applied for a modification of Permit No. 36-00764-S on July 30, 1987. The proposed modification sought to change the status of the development of Section 17 from improved pasture to small vegetable farmland on 639 acres. The surface water management system plan was modified to drain water in Section 17 to the reservoir on Section 20. The water would be directed via a series of lateral ditches and swales. A six foot high dike and one 27,000 GPM pump were also required. Two additional 18" CMP culverts were required at the discharge facilities to accommodate the increased outflow. The Modification of Permit No. 36-00764-S was approved and issued on June 16, 1988. The original Permit NO. 36-00764-S and its modification are similar to a contract novation because the new permits substituted new obligations between the parties for the old ones under Permit No. 36-00315-S. Based upon this approach to the situation, SFWMD allowed the construction work completed under Permit No. 36-00315-S prior to the Stop Work Order of August 27, 1986, to vest. The completion of the berm around the reservoir in Section 20, as set forth in the letter from Elizabeth D. Ross, attorney for SFWMD, on September 19, 1986, was also allowed to vest. However, if the vested matters were changed in the subsequent permits, they became revisions. The revisions take precedence over the vested matters. Otherwise, completed construction under Permit No. 36- 00764-S as modified, and post Stop Work Order construction remains in effect perpetually for the operation portion of the permit. In order to determine with certainty what was permitted when the Notice of Violation was issued on December 20, 1988, the parties would have to look to the project work actually completed on August 27, 1986, the specific construction approved by SFWMD after that date, the subsequent Surface Water Management Permit No. 36-00764-S issued May 14, 1987, and its Modification issued June 16, 1988. The substantial compliance determination issued by Richard A. Rogers, P.E., Resource Control Department dated September 24, 1987, should also be considered as authorized activity. The Notice of Violation dated December 20, 1988, was issued to Respondent Samuel Hubschman, Trustee. He was advised that recent routine inspections indicate that current on-site activity was in violation of Special Conditions 2,3,4,7,14, 17 & 23 of Permit No. 36-00764-S (issued 5/14/87) and Special Conditions 5,16 & 22 of 36-00315-S (modified 6/16/88). A meeting to resolve these issued was suggested by SFWMD. Respondent Hubschman agreed to attend the meeting through his consultants. Both parties elected to attempt resolution of the Notice of Violation controversy through negotiations in a meeting scheduled for January 5, 1989. To demonstrate their sincerity, the parties agreed not to bring attorneys to the meeting. During the meeting, the parties resolved the controversy by agreeing to the following: SFWMD would no longer consider the project to be in violation of Florida law if the Respondents submitted certain items that would cause SFWMD to issue certain permits and modify others. The Respondents would promptly file an application for a dewatering permit so that the governing board could issue the permit at its March 9, 1989 meeting. The Respondent's contractor would make no field changes in the mitigation or excavation areas without first obtaining appropriate permit modification from SFWMD. Small jockey pumps were to be installed to pump water from the internal water management system into certain cypress and/or mitigation areas for the sole purpose of establishing wetland vegetation within the areas. Respondents were to apply for a modification of Permit No. 36-00764-S, as currently modified, to allow a single phase of mining for the entire affected area. The perimeter dike was to be made structurally adequate. Respondents were to submit an alternative proposal for the disposal of cap rock within ninety days. In the meantime, the contractor could continue to bury the cap rock within the mitigation areas. Both parties demonstrated their reliance on the settlement reached in the meeting by their subsequent actions towards completing and processing the applications for permit modifications and additional permits. Although the noted violations were not cured by these actions, the parties intended to reach a cure or to mitigate for present permit violations through new permit conditions. The preliminary staff review of the Respondents' application for modification of Permit No. 36-00764-S, as currently modified, was completed by March 31, 1989. The following information was requested by SFWMD staff: Revised engineering calculations which reflect that the permitted discharge structure is five 18" CMP culverts. An explanation as to why the 6.3 acre maidencane/juncus marsh designated as a preserve area and the adjacent western preserve area were excavated and otherwise disturbed by project activities. The scrapedown methodology for the replanting of mitigation areas. The Respondents' plans for the area delineated on the plans as pine, which is currently permitted as part of a cypress preservation area. Dike certification and reservoir certification. The above-listed information was required to be returned to the SFWMD within ninety days from the date of the written request. At the close of the ninety days, the information was not received. A second request for a response within thirty days was submitted by SFWMD on August 4, 1989. In September 1989, the Respondents attempted to comply with SFWMD's second request for information. Communications continued in regard to the filed application for modification of Permit No. 36-00764-S, as currently modified, into December 1989. After the thirty days expired for the response to the second request for information dated August 4, 1989, SFWMD filed the Administrative Complaint in these proceedings. After the second request for information, a partial response was received from Respondent Hubschman's consultants. The application continues to go through the review process. It has not yet been deemed complete by SFWMD. As part of the resolution of the Notice of Violation dated December 20, 1988, SFWMD issued permit No. 36-01023-W to Respondent Hubschman for construction dewatering, excavation of an irrigation pond, and water storage at the site. The permit was issued on March 9, 1989. Special condition No. 20 of this permit requires a 200-feet setback from the cypress mitigation area and the irrigation pond being dewatered. The setback is shown on Exhibit 10 of the Bonita Farms Dewatering Application which was made part of the permit. A copy of the permit was attached to the Administrative Complaint. No evidence was submitted by SFWMD regarding alleged violations of Special condition No. 20 which were allegedly observed and documented after the permit was issued, before the filing of the Administrative Complaint Respondent Bob Cadenhead is the contractor hired by Respondents Hubschman to construct the surface water management system. There was no evidence presented to show the connection of another party, Respondent, Cadenhead & Sons Construction, to the project.

Recommendation Based upon the foregoing, it is RECOMMENDED: That Surface Water Management Permit No. 36-00315-S be deemed to have vested as to all construction activity completed under the permit which was not addressed in the subsequent permit issued by SFWMD. The completion of the berm, as set forth in Attorney Ross' September 19, 1986 letter, should also be allowed to vest. That Permit No. 36-00764-S and its later modification be ordered to supercede the prior permit in all matters specifically addressed. That the parties be held to their prior agreements to resolve pending permit violations through the permit modification process. That the alleged dewatering violation in paragraph 19 of the Administrative Complaint be dismissed for lack of evidence. That a specific deadline be set to reasonably complete pending application modifications. That all future enforcement action specifically comply with Rule 40E- 1.612, Florida Administrative Code, and remain separate from any permit or permit modification applications. That the parties create a new, active permit file with current drawings and a specific construction schedule. That the Administrative Complaint and Order filed in these proceedings be dismissed. That future agreements be reduced to writing and signed by the proper parties before they are relied upon by either party. DONE and ENTERED this 9th day of November, 1990, in Tallahassee, Leon County, Florida. VERONICA E. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of November, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 89-5737 Petitioner's Proposed Findings of Fact are addressed as follows: Rejected. Irrelevant. Accepted. See HO number 4. Accepted. See HO number 3. Accepted. Rejected. Improper summary. Accepted. See HO number 6. Rejected. Improper opinion testimony. Rejected. Irrelevant. Argumentative. Rejected. Legal argument. Accepted. See HO number 5. Rejected. Legal argument. Rejected. Contrary to fact. See HO number 15. Rejected. Contrary to fact. See HO number 15. The argument presented in this paragraph is overly punctilious. It ignores the detrimental reliance of opposing parties to the agreement. Rejected. Contrary to fact. See HO number 15 and number 16. Rejected. Legal argument and improper opinion. Rejected. Contrary to fact. See HO number 15 and number 16. Rejected. Matters presented were either not ripe for these proceedings or not proved at hearing. See HO number 16-number 20 and HO number 23. Rejected. Contrary to fact and law. Rejected. Not set forth in pleadings. Irrelevant. Rejected. Not set forth in pleadings. Irrelevant. Rejected. Not set forth in pleadings as separate from the Notice of Violation. Irrelevant. Accepted as fact, resolved by agreement. Rejected. Improper opinion testimony. Rejected. Improper opinion testimony. Rejected. Irrelevant. Rejected. Irrelevant. See HO number 15. Rejected. Irrelevant. See HO number 15. Rejected. Irrelevant. Accepted. Rejected. See HO number 15. Rejected. Cumulative. Rejected. See HO number 11-number 12. Contrary to fact. Accepted. See HO number 9. Accepted. Accepted. See HO number 16-number 20. Rejected. Matter is still pending. See HO number 16-number 20. Rejected. Resolved through agreement. See HO number 15. Rejected. Matter is still pending. See HO number 16- number 20. Rejected. Legal argument. Rejected. Not in pleadings. Irrelevant. Rejected. Irrelevant. Accepted. See HO number 21. Accepted. Accepted. Rejected. Speculative. Respondent's Proposed Findings of Fact are addressed as follows: Accepted. See HO number 13. Rejected. See HO number 23. Contrary to fact and pleadings. Accepted. See HO number 14. Accepted. See HO number 15. Accepted. See HO number 15. Accepted. See HO number 20. Accepted. Rejected. Argumentative. See HO number 20. Accepted. See HO number 4-number 7. Rejected. Contrary to fact. The permit modifica- tion specifically required replacement of a pump with 3 culverts. See HO number 5. Accepted. See HO number 5. Accepted. Rejected. Irrelevant. See HO number 7. Rejected. Irrelevant. See HO number 7. Rejected. Irrelevant. Rejected. Contrary to fact. See HO number 7 and number 11. Rejected. Contrary to fact. See HO number 11. Accepted. Accepted. Rejected. See HO number 15. Additional matters were agreed upon which were not reflected in the letter. This is an incomplete summary. Rejected. Irrelevant. Rejected. Irrelevant to these proceedings. Rejected. Contrary to fact. Accepted. Accepted. Rejected. Contrary to fact. See HO number 8 and number 9. Rejected. See HO number 8 and number 9. Contrary to fact. Accepted. Accepted. Accepted. Rejected. Contrary to fact. Accepted. See HO number 23. Rejected. Contrary to fact. Accepted. COPIES FURNISHED: John J. Fumero, Esquire Office of General Counsel South Florida Water Management District Post Office Box 24680 West Palm Beach, FL 33416-4680 Kenneth G. Oertel, Esquire OERTEL HOFFMAN FERNANDEZ & COLE, P.A. Post Office Box 6507 Tallahassee, FL 32314-6507 Russell Schropp, Esquire HENDERSON FRANKLIN STARNES & HOLT, P.A. 1715 Monroe Street Fort Myers, Florida 33902 John R. Wodraska, Executive Director South Florida Water Management District 3301 Gun Club Road Post Office Box 24680 West Palm Beach, Florida 33416-4680

Florida Laws (4) 120.57373.119373.129373.136 Florida Administrative Code (1) 40E-4.321
# 3
TURRELL AND ASSOCIATES, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 94-002571 (1994)
Division of Administrative Hearings, Florida Filed:Naples, Florida May 06, 1994 Number: 94-002571 Latest Update: Feb. 03, 1995

Findings Of Fact By Joint Application for Works in the Waters of Florida filed April 14, 1993, Petitioner requested a dredge and fill permit. The application pertains to the construction of a 3245 square feet platform over a part of Doctors Bay in Naples. Petitioner intends to construct a home on the platform. The application explains that an existing dock covers 1200 square feet of the area proposed to be covered by the new structure. Petitioner offers in the application to enhance the habitat beneath the overwater structure by adding clean concrete rubble and pilings. The application assures that the material would provide suitable substrate and increase the surface area for encrusting organisms such as algae, barnacles, sea squirts, and oysters. The application states that Petitioner would riprap the shoreline and a deadend corner immediately west of the parcel in order to improve tidal flushing. According to the application, Petitioner would also plant mangroves near the deadend corner, as well as inside an atrium entrance to the home. The proposed structure would be located at the south end of a parking lot at the southeast corner of Park Shore Drive and Gulfshore Boulevard. West of the proposed structure is a narrow strip of land running alongside Gulfshore Boulevard. North of the proposed structure is a part of the narrow strip of land and the parking lot. The north and west sides of the proposed site are bulkheaded by vertical seawalls. The waters of Doctors Bay extend south and east of the proposed structure. To the south are a 10-slip dock and a fingerfill peninsula. To the east are several overwater structures covering about 25,000 square feet of water with each structure measuring about 50 feet by 500 feet. The structures are devoted to retail operations. The structure immediately east of the proposed structure is a restaurant owned by Petitioner. Doctors Bay is a Class II waterbody, although it is closed to shellfishing. The waterbody was originally a viable estuary, as part of a relatively shallow back bay and mangrove system. But, as a result of extensive development permitted mostly in the 1960s and 1970s, the waterbody bears little resemblance to the natural system that it once was. Vast areas of the estuary have been dredged and filled for the construction of structures and bridges. Tidal flushing has been impeded by the fill, as well as the uneven bottom left by the dredging projects. Tidal flushing in the area of the proposed project is impeded by the Park Shore Drive bridge to the north. The bay is nearly closed at the point of the bridge. The flushing problem is exacerbated at the proposed site due to prevailing currents and winds, which drive vegetative debris and trash into 90- degree corner of the bay at the site of the proposed structure. The water in this artificially created deadend corner of the bay is not without a source of agitation, however. In addition to runoff from the nearby parking lot, undetained stormwater from Gulfshore Boulevard is dumped into the deadend corner by a stormwater outfall. Not surprisingly, the waters of Doctors Bay violate water quality standards for dissolved oxygen (DO). Monthly DO readings from 1977 through 1989, which was the last year such date were collected, show a trend of water quality deterioration. The site closest to the proposed site violated the DO standard of four parts per million one month each year between 1977 and 1987. In 1988, the same waters violated the DO standard four months, and, in 1989, these waters violated the DO standard eight months. Almost all of the Moorings Bay system, of which Doctor Bay is a part, violated the DO standards for over six months of 1989. Sediments at the proposed site are sandy and silty with shell fragments and high concentrates of polychaetes, or marine worms. Open-water sediments are oxygenated with no presence of hydrogen sulfide. Sediments under existing platforms are not oxygenated and convey the rotten-egg odor of hydrogen sulfide. Microalgae exist on the open-water sediments and shell fragments, but not on those under the platforms. Transparency is much greater in the open water than in the shaded water. Pilings in the area hosted the typical encrusting organisms, such as oysters, barnacles, and periwinkles. As stated in Respondent's inspection report of July 7, 1993, a short- term impact of the proposed project would be the resuspension of nearby sediments from the turbulence of the pile-driving. Under the circumstances, it is unnecessary to address the other short-term concern expressed in the inspection report-the resuspension of heavy metals suspected to exist in the sediments due to the stormwater outfall. As stated in the inspection report, other impacts of the proposed project would include a reduction in transparency. Shading reduces the depth at which photosynthesis takes place, By reducing transparency, the proposed project would likely reduce by at least 10 percent the compensation point, which is the point at which the production of oxygen by plants through photosynthesis is equal to the use of oxygen by plants through respiration by organisms. Also, the proposed structure would interfere with what little water movement exists in the area. Pilings would trap debris, whose decomposition in the water would further reduce DO levels. By letter July 12, 1993, Respondent required Petitioner to submit, among other things, reasonable assurance that the proposed mitigation would reduce the expected impacts of the proposed project and a plan or procedure to protect nearby waters. Petitioner proposes mitigation through the placement of riprap under the proposed structure, which is intended in part to ensure that trapped debris and trash remain above-water. Petitioner also proposes the planting of mangroves over a 140 square foot area, despite the presence of the seawall, and a 400 square foot area atrium in the structure. Aside from an upland relocation of the proposed project, no mitigation can provide the necessary reasonable assurances. Correctly concluding the same thing, Respondent informed Petitioner, by letter dated March 14, 1994, that his application was denied.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Protection enter a final order denying Petitioner's application. ENTERED on December 22, 1994, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on December 22, 1994. APPENDIX Rulings on Petitioner's Proposed Findings 1-12: adopted or adopted in substance. 13-14: rejected as unsupported by the appropriate weight of the evidence. 15-16: rejected as unnecessary. 17 (first sentence): adopted or adopted in substance. 17 (second sentence): rejected as unsupported by the appropriate weight of the evidence. 18-19: rejected as subordinate. 20: adopted or adopted in substance. 21: rejected as subordinate. 22: rejected as subordinate and unsupported by the appropriate weight of the evidence. 23: rejected as subordinate. 24-25: adopted or adopted in substance. 26-27: rejected as unsupported by the appropriate weight of the evidence. 28-30: rejected as unnecessary. 31 (first sentence): rejected as subordinate and irrelevant. 31 (second sentence): rejected as unsupported by the appropriate weight of the evidence. 32-33: rejected as unsupported by the appropriate weight of the evidence. Rulings on Respondent's Proposed Findings 1-4 (first sentence): adopted or adopted in substance. 4 (second sentence): rejected as irrelevant. 5-23: adopted or adopted in substance. 24-29: rejected as unnecessary. 30-31: adopted or adopted in substance. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Philip J. McCabe, pro se 8111 Bay Colony Dr. #204 Naples, FL 33963 Douglas M. MacLaughlin Assistant General Counsel 2600 Blair Stone Road, Room 654 Tallahassee, FL 32399-2400 J. Kendrick Tucker Huey Guilday Highpoint Center, Suite 900 106 E. College Ave. Tallahassee, FL 32302

Florida Laws (4) 120.57373.403373.413373.414
# 4
UNIVERSITY HIGH EQUITY REAL ESTATE FUND II, LTD. vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 86-001724 (1986)
Division of Administrative Hearings, Florida Number: 86-001724 Latest Update: Aug. 18, 1986

Findings Of Fact On or about March 7, 1986, Petitioner submitted an application for a variance from the open space and rear set-back line requirements applicable to property located at 2612 U.S. 19 North, Clearwater, Florida. The subject property is zoned CC (commercial center). Petitioner's application requests a variance to provide 12.33% open space instead of 25%, and to construct a building 30 feet from the rear property line rather than 50 feet as required by the Land Development Code for property zoned CC. On or about April 24, 1986, the Development Code Adjustment Board denied Petitioner's application for a variance, and Petitioner timely appealed on May 6, 1986. The only evidence in support of its application offered by Petitioner was the testimony of Robby Tompkins. He testified that Petitioner's application is "unique" because Petitioner was 90% complete with its architectural plans for the renovation and modernization of the subject property when the current ordinance took effect, and Petitioner therefore urges that the current ordinance should not apply. Additionally, Petitioner argues that there will be no injury to the public as a result of the variance, and in fact the project will add 6800 square feet to its shopping center. Tompkins admitted that an increase in financial return was the primary reason Petitioner has sought the variance. Finally, he stated that if Petitioner complies with the 25% open space requirement, there will not be enough parking to meet Code provisions, and if sufficient parking is provided, there will not 25% open space.

Florida Laws (1) 120.65
# 5
YPAPANTI AND SEVASTI ALEXIOU/FRENCHY`S RESTAURANT vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 01-000272 (2001)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Jan. 19, 2001 Number: 01-000272 Latest Update: May 14, 2001

The Issue The issue is whether Petitioners' application for site plan approval for a proposed renovation and addition to their restaurant should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: In this local land use dispute, Petitioners, Ypapanti and Sevasti Alexiou, who operate a restaurant under the name of Frenchy's Rockaway Grill, have appealed a decision by the Community Development Board (Board) to deny an application to renovate and expand their restaurant located at 7 Rockaway Street, Clearwater Beach, Florida. The Board, which is made up of seven local residents, acts as the local planning agency for Respondent, City of Clearwater (City). Although the City staff supports the project, the City is technically opposed to the application since the Board failed to approve the project by a 3-3 tie vote. In denying the application, the Board rejected the City staff's recommendation that the application be approved. Intervenor, Hunter Hotel Company, owns and operates a hotel known as Clearwater Beach Hotel which is contiguous to, and south of, Petitioners' property. It objects to the application on the grounds that "the criteria for the flexible development approval were not met nor proved, [and] that the relief requested [by Petitioners] is of such a magnitude that it is not warranted and cannot be allowed under the Code." As further clarified by Intervenor, the City's parking shortage in the Beach area is the "core issue on this appeal." Until the City solves the parking problem, Intervenor suggests that there should be a moratorium on development in the Beach area. Petitioners own and operate a popular and successful one-story restaurant and bar on a 0.38-acre lot at 7 Rockaway Street, Clearwater Beach, which fronts directly on the Gulf of Mexico. The property is zoned as a part of the City's Tourist District and is bounded by the Gulf of Mexico on the west, a municipal parking lot to the north, a motel on the east, and the Clearwater Beach Hotel on the south. Due to the small size of their lot, Petitioners seek to vertically expand their restaurant by adding a second story consisting of 3,487 square feet, including an approximately 2,300 square foot open deck and 1,200 square feet of enclosed area. Both sections will accommodate bar patrons and diners. Petitioners also intend to remove and replace a 945 square foot storage room attached to the south side of the building which is structurally unsound. To accomplish these changes, Petitioners will need "flexibility" in meeting setback and parking requirements. Because more than 95 percent of the City is now "built out," and very little land is vacant, the City has adopted comprehensive infill criteria for non-conforming structures, such as Petitioners' restaurant. The criteria which apply to Petitioners' project are found in Section 2- 803C. of the City of Clearwater Redevelopment Code (Code) and allow flexibility in promoting redevelopment and infill throughout the City, including the Clearwater Beach area. As pointed out by City staff, infill projects are often used on Clearwater Beach because there are so many non-conforming structures in that area. In determining whether a project should be given flexibility as an infill project, the City evaluates the proposed project against its infill criteria. Strict compliance with all criteria is not required, but rather the criteria are weighed or balanced collectively. If a project cannot meet a "significant number of [criteria], or a significant one in a meaningful way," then an applicant "would have problems [with gaining approval]." Once a project qualifies as an infill project, an applicant may then use flexible development standards for setbacks, height, size, and minimum off-street parking. In this case, Petitioners seek flexibility for setback and off-street parking requirements. As noted earlier, the main concern raised by Intervenor centers around item 9. of the criteria, which reads as follow: 9. Adequate off-street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development. Intervenor contends that this criterion was not satisfied, and thus the project cannot qualify as an infill project. In addition, in its Proposed Final Order, the City contends that Petitioners have failed to satisfy items 1. and 5., which read as follows: The development or redevelopment of the parcel proposed for development is otherwise impractical without deviations from the use, intensity and development standards; 5. Suitable sites for development or redevelopment of the uses or mix of uses within the comprehensive infill redevelopment project are not otherwise available in the City of Clearwater. Table 2-803 of the Code establishes minimum off- street parking requirements of 7 to 15 parking spaces per 1,000 square feet for restaurants in the Tourist District. Therefore, a restaurant of Petitioners' size (that was not an infill project) would be required to have at least 47 off- street parking spaces. In actuality, Petitioners have only 13, due to a variance having been previously granted. Since Petitioners intend to add around 3,400 square feet through the second floor addition, the Code would normally require a minimum of 24 additional parking spaces, or a total of 71. However, these off-street standards do not apply to infill projects. Instead, another provision in Table 2-803 of the Code provides that minimum off-street parking for infill projects shall be "[d]etermined by the community development coordinator based on the specific use and/or ITE [Institute of Transportation Engineers] Manual standards." Therefore, using the guidelines in the foregoing provision, the community development coordinator determines the number of additional off-street parking spaces, if any, that an infill project will require. Because the City staff concluded that a parking study would assist it in analyzing the specific use of the property, it requested that Petitioners perform a parking study. The study was conducted by Robert Pergolizzi, a certified planner, who has performed a number of parking studies during his career. The Code does not describe any criteria for a parking study for an infill project. Therefore, the staff looked at other sections of the Code in arriving at a methodology to be used for the study. More specifically, it first considered Section 2-803J.6.a., which provides in part that off-street parking requirements can be relaxed if "the physical characteristics of the proposed building are such that the likely uses of the property will require fewer parking spaces per floor area than otherwise required." Because the restaurant sits directly on the beach, the staff believed that the primary destination of many of the customers was the beach, and not the restaurant, and that the visit to the restaurant was a side trip by the customers. Thus, the parking study methodology was designed, in part, to confirm or disaffirm that assumption. Section 2-803J.6.c. also provides flexibility in off-street parking requirements if "adequate parking is available on a shared basis as determined by all existing land uses within 1,000 feet of the parcel proposed for development, or parking is available through any existing or planned and committed parking facilities." The staff used this section of the Code to determine that 1,000 feet was an appropriate distance to analyze available parking for a restaurant. Therefore, Pergolizzi was directed by the staff to analyze available parking within 1,000 feet of the restaurant. Pergolizzi conducted his study on August 25 and 26, 2000, the Friday and Saturday which preceded the Labor Day holiday weekend. It is undisputed, and the parties have stipulated, that Pergolozzi conducted the study entirely consistent with the agreed methodology. The study confirmed that the primary destination of 49 percent of the restaurant's customers was the beach, and not the restaurant. In other words, the expansion would not affect the parking demand generated by almost one-half of the customers. The study also confirmed that there was available parking within 1,000 feet of the restaurant to accommodate not only the existing business, but the proposed expansion as well. As noted above, Table 2-803 of the Code required that the community development coordinator determine the minimum off-street parking after consideration of the specific proposed use and/or the ITE Manual standards. Here, the City staff looked at the specific use, the ITE Manual standards, and the parking study to determine the minimum off-street parking required for the restaurant. It concluded that there was available parking within 1,000 feet of the restaurant and that no additional parking spaces were required. The community development coordinator concurred with the results of the study and analysis and likewise determined that the minimum off-street parking for the project were the existing 13 spaces. This determination was wholly consistent with the requirements of the Code. In recommending to the Board that the project should be given flexibility as an infill project, the staff's report contained the following conclusion: The proposal is in compliance with the standards and criteria for flexible development approval, with maximum development potential, requirements of the Comprehensive Infill Redevelopment Projects, and with all applicable standards of the Community Development Code. A more detailed analysis of how each of the ten criteria were satisfied is found in Petitioners' Exhibits 9 and 14 received in evidence. At the hearing on March 27, 2001, the City's assistant planning director also established that the proposed expansion and renovation complied with all applicable standards of the Code. Intervenor's expert witness, Gail Easley, a certified planner, questioned whether the methodology used by Pergolizzi complied with the Code. More specifically, she contended that the City was required to determine minimum off- street parking for infill projects in the manner described in Section 2-803C.9. That section provides that "[a]dequate off- street parking in the immediate vicinity according to the shared parking formula in Division 14 of Article 3 will be available to avoid on-street parking in the immediate vicinity of the parcel proposed for development." If this contention were true, however, it would render meaningless the provision in Section 2-803C.8., which provides that "[f]lexibility in regard to lot width, required setbacks, height and off-street parking are justified by the benefits to community character in the immediate vicinity of the parcel proposed for development and the City of Clearwater as a whole." In other words, there would be no flexibility for off-street parking as permitted by that section. This would be contrary to the very purpose of infill projects. Witness Easley's interpretation is also inconsistent with Table 2-803, which states that "minimum off-street parking will be determined by the community development coordinator based on the specific use and/or ITE Manual standards." Under her interpretation of the Code, the community development coordinator would have no right to determine minimum off-street parking for infill projects based on the specific use and/or ITE Manual standards, despite clear language in the Code to the contrary. More importantly, the criteria in Section 2-803C., including item 9., are used to determine whether a project should be considered an infill redevelopment project under the Code. Item 9. is simply one of those criteria, and it does not establish minimum off-street parking requirements for an infill project. Witness Easley also opined that it was inappropriate for the parking study to consider on-street parking. However, the Code does not prohibit the community development coordinator from requesting a parking study which includes on- street parking. It only requires that he consider the specific use and/or ITE manual standards when determining off- street parking for an infill project. Other contentions that the methodology was flawed, including a concern about the date and time of the study and the use of 1,000 feet as a measuring stick for available parking, have been considered and found to be without merit. A contention was also made that certain other infill criteria were not met. However, there was no evidence to support these contentions, and the more persuasive evidence supports a finding that all criteria have been satisfied, and that Petitioners qualify as an infill project. The undersigned has also considered the testimony of the owners of two competing restaurants who object to the project. While they contended that the lack of parking motivated their opposition to the application, it is fair to infer from their testimony that they object mainly because they fear that Petitioners may capture some of their business through an expansion of their restaurant. Finally, in its Proposed Final Order, the City has contended that Petitioners have failed to satisfy a general standard contained in Section 3-913A.6., which requires that an applicant ensure that: [t]he design of the proposed development minimizes adverse effects, including visual, acoustic and olfactory and hours of operation impacts, on adjacent properties. Given the modifications agreed to by Petitioners in the following Finding of Fact, the requirements of this section have been met. In the nature of an affirmative defense, Petitioners have raised the issue of equitable estoppel and contend that Intervenor should be estopped from opposing the application. The facts underlying this argument are as follows. On November 21, 2000, the Board heard testimony and considered the application for the first time. At that meeting, Intervenor's counsel represented to the Board that "my client's concern is not the parking. My client's concern is because of proximity of noise and light intrusion." In light of these concerns, counsel for Petitioners and Intervenor reached an agreement wherein Petitioners agreed to limit the addition to the northern one-half of the existing building, construct an 8-foot concrete block wall on the south property line between the restaurant and the hotel, close the upstairs addition at 10:00 p.m. on week nights and 11:00 p.m. on Fridays and Saturdays, place no outside speakers and allow no live music on the upstairs addition, and direct upstairs lighting away from the hotel. With these accommodations, counsel for the hotel represented to the Board that "if [the Board] approve[s] this, you have addressed our primary areas of concern." After the close of public comments, the Board voted to approve the application by a 3-2 vote. Because four votes are required to approve an application, and one member was absent from the meeting, the matter was continued to the next meeting on December 12, 2000. By letter sent to Petitioners' counsel on December 5, 2000, Intervenor's counsel identified the "commitments at the preceding hearing, which [Petitioners were] willing to make to the Clearwater Beach Hotel." Upon receipt of that letter, Petitioners advised the City by letter that they were in agreement with Intervenor's counsel that "these are the conditions agreed to at the last CDB meeting, which shall be binding upon my client." Notwithstanding earlier representations, by letter dated December 7, 2000, counsel for Intervenor indicated that "the owners of Clearwater Beach Hotel have instructed us to object to the pending application. Upon further review, prompted by the renderings, the magnitude of this project is simply too great for the size of the property." The letter further stated that it was to be considered "as withdrawal of our prior letter and position of 'no objection,'" and that Intervenor would attend the December 12 hearing "to formally object." Petitioners have further contended that Board member William Johnson had ex parte communications with some of his neighbors concerning the merits of this application, and this constituted a departure from the essential requirements of the law. Section 4-206D.2. of the Code provides that "no member of the community development board or the city commission shall engage in any ex parte communications with any person in regard to the substance of a quasi-judicial matter which is to be considered by the board or commission, as the case may be." If such communications occur, Section 4-206D.3.a. requires that a member disclose these communications at the meeting. There is no record of any disclosure being made. At the first Board meeting on November 21, 2000, member Johnson had moved for approval of the application. Without any explanation, at the second meeting on December 12, 2000, he voted against the application. Member Johnson did not testify at hearing to confirm or deny Petitioners' allegation of wrongdoing. However, witness Pergolizzi testified that he spoke with member Johnson just after the December 12 meeting, at which time member Johnson allegedly admitted that he had such conversations with his neighbors and was sorry for his change of vote. But the out-of-court statements of member Johnson are hearsay in nature, do not supplement or explain any other competent evidence on this issue, and they cannot form the basis for a finding of fact.

Florida Laws (1) 120.57
# 6
GROVE ISLE, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-002609 (1981)
Division of Administrative Hearings, Florida Number: 81-002609 Latest Update: May 05, 1982

Findings Of Fact The following findings are based on the uncontested facts alleged in Petitioner's Motion For Summary Recommended Order and from the Final Orders issued in Bayshore Homeowners Association v. Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. On December 29, 1980 DER entered a Final Order on the application of Petitioner for a 90 slip marina in Biscayne Bay, Florida. The Order denied the permit because Grove Isle had not demonstrated that the project is "affirmatively in the public interest" and because the applicant had not demonstrated that it "can meet ambient water quality standards within the project area itself." In the Recommended Order on Remand the Hearing Officer had defined "existing ambient waters" to be the area in the cove between Grove Isle and the Miami mainland. The Final Order rejected that concept and held if any waters others than those contained within the immediate project site were to be considered as ambient, Petitioner must request a mixing zone as part of its application. See Section 17-4.242, (1)(a)2.b. and Section 17-4.244, Florida Administrative Code. By a letter received at the Department of Environmental Regulation on May 20, 1981, Grove Isle reapplied for the boat dock permit which was the subject of the foregoing proceedings. Petitioner's application, which was in the form of a letter from counsel, stated: May 18, 1981 Mr. Larry O'Donnell Department of Environmental Regulation Post Office Box 3858 West Palm Beach, Florida 33402 RE: GROVE ISLE - Application for Boat Dock Dear Mr. O'Donnell: On behalf of Grove Isle, LTD, I am reapplying for the boat dock permit previously applied for by Grove Isle, LTD. Please consider this a short-form application. Your office designated a previous file number, DF 13-7956, to this matter. In conjunction with that application I am applying for a mixing zone, pursuant to Rule 17-4.244, for both the construction and operation of this marina. Please refer to your file on the previous application and incorporate said documents into this reapplication. I am submitting with this application: A scale drawing (one inch = 100') of the proposed facility. (which you have) A certified survey of the proposed mixing zone. (one inch = 100') An application fee of $20.00 A copy of the Final Order issued by Jacob D. Varn, former secretary of DER, on the previous application. A copy of the Notice of Intent previously issued for this project, dated 9/23/79. (which you have) As you will note from reading Mr. Varn's Final Order, he concluded that issuance of this permit was not appropriate inasmuch as the applicant had not applied for nor received a designated mixing zone. We do not necessarily agree with this order and have, in fact, appealed this decision to the First District Court of Appeal. However, in an attempt to keep this matter from becoming any more complicated, we have decided to reapply for the permit and to apply for a mixing zone. We do not concede that a mixing zone should be required for this project or that the facility will result in the release of any pollutants so as to significantly degrade ambient water quality. However, should this project, through its construction or operation, result in the release of any pollutants, I believe they would be limited to: Bottom sediments placed in suspension by the installation of the concrete piles used to support the docking facility during construction; Minimal amounts of oil and grease which may escape from the various vessels moored to the docks; The constituants of anti-fouling paint which may be applied to the hulls of the various vessels moored at the docks. Turbidity will be controlled by the use of curtains during construction. If lowered water quality occurs at all in this project it would only occur within the designated mixing zone, as per Rule 17-4.242 (2)(b) F.A.C. Please advise me should additional information be needed to process this re-application. Yours truly, /s/ KENNETH G. OERTEL On June 19, 1981, DER sent a "completeness summary letter" to Petitioner which requested the following information: Your project is in Outstanding Florida Waters. Please provide the following items demonstrating compliance with Section 17-4.242, Florida Administrative Code. Please demonstrate that this project is clearly in the public interest and that this project will not result in the degradation of ambient water quality beyond the 30 day construction period. Petitioner responded by letter dated June 22, 1981 and which was received at DER on June 25, 1981. Petitioner said in pertinent part: Dear Mr. Duke: If you would check your previous file no. DF-13-7956, I believe you will find all the information you have requested has previously been provided to your office either in that permit file or through the administrative hearings held in pursuit of this application. I think it would be more fruitful if you would communicate with Al Clark, Attorney for DER, with regard to the status of this application. As I do not wish to speak on behalf of Mr. Clark, I believe you should confirm the status of this application with him, particularly in view of our attempt to comply with Secretary Varn's Final Order which suggests the application for this mixing zone. The record reflects no further correspondence between the parties until September 23, 1981 when the Department entered a Final Order Denying Application for Permit. The Order provided that: This project was reviewed previously (DF 13-7956) and was determined not to be clearly in the public interest pursuant to Section 17-4.242, F.A.C. No further evidence upon resubmittal, has been provided to clearly demonstrate that this project is in the public interest. Furthermore, the requested mixing zone exceeds that allowable pursuant to Section 17-4.244, F.A.C. and can be applied only during the construction period, pursuant to Section 17-4.242, F.A.C. During the operation of this facility ambient water quality is expected to be degraded in violation of Section 17-4.242, F.A.C. This order was entered ninety-one days after DER received Petitioner's June 22, 1981 letter.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Environmental Regulation issue the permit applied for by Petitioner, Grove Isle, Ltd. on May 20, 1981 subject to the conditions contained in the Notice of Intent To Issue Permit dated October 23, 1979 which is a part of the record in Bayshore Homeowners Association et al., v. State of Florida Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. DONE and RECOMMENDED this 12th day of February, 1982, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1982.

Florida Laws (2) 120.57120.60
# 7
VINCENT J. WOEPPEL vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-004063 (1992)
Division of Administrative Hearings, Florida Filed:Lake Wales, Florida Jul. 06, 1992 Number: 92-004063 Latest Update: Apr. 16, 1993

Findings Of Fact On December 12, 1991, Petitioner applied to the Respondent for a permit/water quality certification to grade and level, in stages, approximately 20,000 square feet or 0.45 acres of lake front to remove and prevent the formation of berms and depressions in the exposed lake bottom adjacent to his property. The project site is located at 3955 Placid View Drive which lies along the shoreline of Lake Placid, a natural waterbody in Highlands County, Section 24, Township 37 South, Range 29 East. Lake Placid is not an aquatic preserve, and is not an outstanding Florida water. It has been designated as a Class III waterbody. Petitioner's unsubdivided lot lies at the western end of Lake Placid. The shoreline measures approximately 203 feet. The western lot line also measures 203 feet, and fronts on Placid View Drive. The water level of Lake Placid has receded in recent years which allows large expanses of what was historically lake bottom to become beaches, lawns, and areas of habaceous marsh. The specific project which the Petitioner proposes calls for the leveling of the berms and depressions which form on the exposed lake bottom from collected water, which stagnates and permits various noxious creatures, including mosquitoes, to breed in them. The berms and depressions are approximately six inches high or deep and between one and three feet wide, and generally extend the length of the shoreline. The proposed area affected is approximately 20,000 square feet or 0.45 acres of lake front, although Petitioner proposes to actually level a much smaller area in stages of approximately 2,000 square feet on an "as needed" basis. No material other than sod in the beach area is proposed to be brought from or removed to off-site locations. Petitioner is highly sensitive to mosquito bites. The area proposed for leveling was previously cleared of vegetation without authorization. Very little revegetation of the shoreline has occurred since the area was cleared. Vegetation colonizing the beach, at present, includes pennyworts (Centella asiatica and Hydrocotyle umbellata) and water- hyssops (Bacopa sp.) Blue green algae was observed in the depressions which have formed along the shore since the clearing. Fauna observed on-site included gulls (Larus sp.), small fish in the adjacent lake shallows, and water-boatmen (Order Hemiptera) in the depressions. An area landward of the wetlands considered here was also cleared previously and is proposed to be seeded. An adjacent, uncleared shoreline was vegetated with primrose willow (Ludwigia sp.), cattail (Typha sp.), flat sedge (Cyperus odorata), and other wetland species for an almost 100% plant coverage. The Petitioner proposes to use a small tractor in leveling of the shore which will cause turbidity in the lake water. No turbidity controls were proposed by the Petitioner. Petitioner failed to provide reasonable assurances that the turbidity caused by the earthmoving equipment in areas presently above water would not cause degradation of water quality in Lake Placid; would not contribute to the long-term degradation of water quality in the lake caused by upland runoff that would flow into the lake without benefit of retention or filtration by shoreland vegetation (freshwater herbaceous habitat) which would be permanently removed under Petitioner's proposal. Nutrients such a nitrogen and phosphorus and pollutants such as pesticides, herbicides and other chemicals commonly used in lawn and garden care would be included in the runoff, and would have an adverse impact on fishing and marine productivity in the lake. The project would have a minor adverse impact on erosion and soil stabilization in the area surrounding the lake. Petitioner has failed to provide reasonable assurance that the proposed project is not contrary to the public interest. Petitioner can mitigate the project by eliminating the use of heavy equipment and substitute hand equipment to smooth out ruts, berms and depressions in jurisdictional areas.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Petitioner's application for Wetland Resource Regulation permit be DENIED. DONE and ENTERED this 8th day of March, 1993, in Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings ths 8th day of March, 1993. COPIES FURNISHED: Francine M. Ffolkes, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mr. Vincent J. Woeppel 3955 Placid View Drive Lake Placid, Florida 33852 Daniel H. Thompson Department of Environmental Regulation Acting General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Virginia B. Wetherell Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 120.57211.32267.061
# 8
DR. PHILLIPS, INC. vs. CENTRAL AND SOUTH FLORIDA FLOOD CONTROL DISTRICT, 76-000237 (1976)
Division of Administrative Hearings, Florida Number: 76-000237 Latest Update: Apr. 29, 1976

Findings Of Fact The subject application requests a water use permit from the Central and Southern Florida Flood Control District (FCD) for the supplemental irrigation of 145 acres of citrus lands located in Orange County. Received into evidence at the hearing were the public notice of hearing appearing in the Sentinel Star, permit application number 21424 with an attached report and the Staff Report of the FCD, prepared by Nagendra Khanal. The applicant requested an annual allocation of water in the amount of 120.15 acre-feet or 9.94 inches per year, for a period of twenty (20) years. The Staff Report recommends the issuance of a permit for said amount, with maximum monthly pumpages not to exceed 49.8 acre-feet or 4.13 inches, the permit to expire on January 15, 1978. Several further special provisions were recommended on pages 4 & 5 of the Staff Report, which report is attached hereto. There is no dispute between the applicant and the FCD over the technical aspects of the Staff Report. The protests of the applicant center around the length of the permit and some of the special provisions recommended in the Staff Report, which the applicant feels are vague and ambiguous. Mr. James A. Hinson, the applicant's corporate secretary, felt that the FCD had sufficient data and statistics as to the water resources and agricultural usage within the area to sustain the granting of a twenty year permit. It was further felt that the issuance of a two-year permit for the purpose of gathering information as to the quantity of use would tend to prompt higher usage and even lead to falsification of pumpage records on the part of agricultural users so as to assure the issuance of future permits. The applicant was also concerned with the costs of applying for another permit in two years. Mr. Nagendra Khanal, a hydrologist with the FCD, explained that the purpose of the two-year permit was to obtain information from agricultural users in the area as to the amount of water used and the effect of such usage on the Florida aquifer system. Since the outset of regulatory provisions, the FCD has set the same termination date for each permit for agricultural use within each of the basins. At that expiration time, the pumpage records for all users in the area will be established and present experimental estimates can then be compared with actual usage. Little is known by the FCD about how the Florida aquifer system operates and the data presently in use are experimental. Since all permits within each basin will expire on the same date, the entire basin can then be evaluated at one point in time. It was felt that if falsification of pumpage records were to occur, it could probably be detected by data currently available to the FCD. It was further opined by Mr. Khanal that at, the expiration date of all permits issued in each basin, an automatic conversion into new permits would occur at little or no cost to the applicant. With regard to the special provisions recommended in the Staff Report, Mr. Hinson expressed concern over the manner of compliance. Specifically, he desired more information on the type of equipment or devises required by the FCD when it calls for "minimum head pressures", and "a measuring device on each of the three wells." He also desired information as to the times of year the water quality analyses were to be performed. Mr. Khanal explained that no regulatory criteria had been established by the FCD with regard to pumpage and that the minimum type of measuring device, such as a time clock, on each of the wells would suffice. Further specifications will be supplied to the applicant upon request. It was explained by Khanal that the water quality analyses should be performed once before the rainy season (at the end of May) and once after the rainy season (at the end of October). There was some confusion over the inclusion of the parameter of "specific conductivity" within the definition of a standard complete water quality analysis. Finally, Mr. Khanal listed two amendments to be made in the Staff Report. On page 2, under "B. Existing Facilities", "3,500 gpm" should read "3,600 gpm." The last item on the chart on page 3 of the Staff Report should read "2 in 10 Year Drought" in lieu of "1 in 10 Year Drought."

Recommendation Based upon the findings of fact and conclusions of law recited above, it is recommended that Application No. 21424 be granted and that a permit be issued in accordance with the recommendations and provisions set forth in the Staff Report, as amended. Due to the apparent confusion over the inclusion of "specific conductivity" as a parameter to be included within the definition of a standard complete analysis, it is further recommended that the Staff make further inquiry into its necessity. If the Staff then concludes that "specific conductivity" is necessary to obtain a complete water quality analysis, it is recommended that it remain on the list of parameters. Respectfully submitted this 5th day of March, 1976, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of March, 1976 COPIES FURNISHED: Thomas C. Garwood, Jr., Esquire Akerman, Senterfitt, Eidson and Wharton 17th Floor CNA Building Orlando, Florida Stephen A. Walker, Esquire Post Office Box V West Palm Beach, Florida 33402

# 9
STANISLAW BUDZINSKI AND KAZIMIERA BUDZINSKI vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 97-001109 (1997)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Mar. 10, 1997 Number: 97-001109 Latest Update: Jun. 09, 1997

Findings Of Fact Lior Hason is the owner of Britt's Cafe, a restaurant which occupies property owned by the Petitioner's Stanislaw and Kasimiera Budzinski. On or about December 19, 1995, Harry S. Cline, an attorney for Mr. Hason and the Budzinskis, filed an application for a variance from the City of Clearwater's Development Code, for the purpose of eliminating three required parking spaces from the front of the subject property for the construction of an outdoor cafe at 201 South Gulfview Boulevard. The Code requires one parking space per 200 square feet of gross floor area, and a variance was required to remove three existing parking spaces from the unit's parking space inventory. The matter was brought before the City's Development Code Adjustment Board at its January 11, 1996 meeting. Mr. Cline appeared at the meeting on behalf of the applicant and presented the project. No one else was present to speak in support of or in opposition to the request. However, four letters in opposition from neighboring business owners were submitted. Notwithstanding these objections, the Board determined that the applicant had substantially met all standards for approval listed in the City's Land Development Code; and upon vote of the Board, the application was approved, subject to certain conditions, by a three to two majority. Mr. Hason entered into discussions with City officials to determine what was necessary. Official City reaction was initially favorable. Mr. Hason was advised of the requirements for the project and had plans drawn which called for a deck with a 35 to 36 inch railing with landscaping around it, and with posts and lights. When the plans were submitted to the City officials, the only change suggested was to raise the railing height to 45 inches, which was done, after which the City approved the plans and the permit was granted. The deck was then constructed exactly according to the approved plans. At some time during 1996, Mr. Hason discussed with some City employees putting an awning over the deck. During these discussions, the City employees sent Mr. Hason a copy of Section 41.221(1)(c), Clearwater City Code, which provides for awnings to be removable. Mr. Hason considered the sending of this Code provision to be tantamount to a favorable reply to his inquiry, and, based on that, he finalized his plans for the installation of a removable awning. The proposed awning is designed in such a fashion as to be extendible and retractable on a frame, capable of easily being pulled up against the front of the building like a drapery. With a minimum of further effort, consisting of the removal a several bolts, the entire awning construction can be removed from the frame. Mr. Hason submitted his application for the variance to install the awning on February 2, 1997. In the interim, the City employees with whom Mr. Hason discussed the project changed their position from favoring the project to opposing it. He was ultimately advised in December 1996 or January 1997 that the awning could not be permitted because an awning could not be approved over a deck for which a permit should not have been issued and for which the issuance was a mistake. Though the Board had not yet voted on the application, no information was given to Mr. Hason as to what he could do to make the project approvable. His application, on February 2, 1997, was submitted because, Hason claims, he had been told, by someone not further identified, that applying for a variance for the awning would make everything right. The Variance Staff Report submitted to the Board by the appropriate City employees acknowledged that the frame over which Mr. Hason proposed to put the awning does not meet code because it was constructed within a required setback area from South Gulfview Boulevard, but since the frame was built pursuant to a City-issued permit, consistent with City policy, the City accepted its existence. In its final recommendation to the Board, the staff concluded that notwithstanding the encroachment into the setback area, the project "appears to comply with all standards for approval, provided attention is given to the external appearance of the cafe:" The staff then went on to recommend approval of the project subject to certain conditions, all of which, Mr. Hason accepts and agrees to. Nonetheless, the Board denied the permit by a vote of four to one. Mr. Hason contends that the Board vote was an attempt by the Board to get back at him because of what it perceived as his failure to comply with the conditions placed upon the issuance of the first permit and his alleged misrepresentation of the scope of his project at the time. Mr. Hason, however, categorically denies he has done anything contrary to the dictates of the City. He went back to City officials many times during the construction of the deck to make sure the project was built as required. The majority of the Board members believe, however, that the deck as constructed, goes far beyond the limited structure approved by the granting of the parking space variance in January 1996. This animosity toward the project can be seen from a review of the audio record of the February 13, 1997, Board meeting where, during a colloquy between a Board member and Mr. Hason, it appeared the member was somewhat put out by the entire situation. His analysis indicates a less than complete recollection of the matter, however. Whereas one of the conditions to the issuance of the initial permit was that the area of the outdoor cafe should not be greater than 25 percent of the indoor area of the restaurant, this member pointed out that the 69 outdoor seats were far in excess of 25 percent of the 115 or so indoor seats. This constituted a confusion of seating as opposed to area. No evidence was presented concerning whether Mr. Hason had violated the area constraint. In the main, however, while it appeared that a majority of the Board members were unhappy about the way the project developed, and expressed the opinion that the project did not conform to what they had intended to approve, there was no indication any member s vote was motivated by anything other than a sincere belief in the correctness of his position. There was no indication of any inappropriate or vindictive action by anyone on the Board or its staff. Stephen Sarnoff, a central permitting specialist with the City reviewed the plans for the initial construction and for the current application. As he recalls, the plans for the initial deck construction did not show any support beams, fans, overhead structure or latticework fencing, and the deck, as built, does not conform to the plans as submitted. City Code requirements call for a railing of from 30 to 42 inches high. The current railing of 45 inches does not conform to that standard, and Mr. Sarnoff is not aware of any request from the City that the railing be raised to that height, as Mr. Hason claims. By the same token, while there is no requirement in the ordinance that a deck be of a certain height, anything higher than 12 inches is considered a structure and a waiver is required. This deck was approved for 12 inches. A certificate of occupancy is usually issued for a deck, but in the instant case, such a certificate has not been issued because the deck, as built, is not in compliance with the 1996 approval. If it is brought into compliance, it will be approved. Sarnoff is aware of and familiar with other outdoor restaurant decks built at various locations in the Clearwater area, as indicated by Mr. Hason. Some are not within the CR-28 zone and do not come under the same standards as are applicable here. Others, which must conform to the instant requirements appear to have movable awnings which are acceptable. Still others are in a different zoning district with different set-back requirements, and some were initially denied, but were subsequently approved when they were brought into compliance with the requirements. John Richter, a senior planner for the City, was the individual who prepared the staff report on the instant project and initially recommended approval, contingent upon changes to the external appearance of the facility. He made suggestions and has discussed the project with Hason on his several visits to the property. He did discuss an awning with Hason at some point, but their discussions did not deal with its mobility. All in all, Mr. Richter concluded that the project appears to meet the standard for approval, provided attention is given to the external appearance of the cafe. David S. Shuford, the City's central permitting director and development code administrator indicated that the variance required for the awning, which was an integral part of the structure already built, was not automatically granted with the granting of the permit for the deck structure. Section 42.221, Clearwater City Code, was adopted to promote a more festival atmosphere in some of the outdoor tourist areas. The intent of subsection (l)(c) of that provision was to require the use of moveable items and to design structures that would meet wind requirements and not interfere with pedestrian traffic. The term "moveable" means what it says, and in Shuford's opinion, from the plans he saw, the proposed awning would not be easily moveable on a daily basis. The Clearwater City Code establishes the area in question as one where, once guidelines are developed, they will be adopted and be complied with. Mr. Shuford opines that the current deck, in the rafter area, goes beyond what was proposed at the time the project was submitted for the parking variance and was approved. This is what appears to be the source of the difficulty the Board members have with it. However, if designed to comply with the guidelines, this awning could be approved. He would agree with the conditions outlined in the staff recommendation so far as they relate to painting and architectural matters.

Florida Laws (2) 120.57120.69