DR. PHILLIPS, INC. vs. CENTRAL AND SOUTH FLORIDA FLOOD CONTROL DISTRICT, 76-000237 (1976)
Division of Administrative Hearings, Florida Number: 76-000237 Latest Update: Apr. 29, 1976

Findings Of Fact The subject application requests a water use permit from the Central and Southern Florida Flood Control District (FCD) for the supplemental irrigation of 145 acres of citrus lands located in Orange County. Received into evidence at the hearing were the public notice of hearing appearing in the Sentinel Star, permit application number 21424 with an attached report and the Staff Report of the FCD, prepared by Nagendra Khanal. The applicant requested an annual allocation of water in the amount of 120.15 acre-feet or 9.94 inches per year, for a period of twenty (20) years. The Staff Report recommends the issuance of a permit for said amount, with maximum monthly pumpages not to exceed 49.8 acre-feet or 4.13 inches, the permit to expire on January 15, 1978. Several further special provisions were recommended on pages 4 & 5 of the Staff Report, which report is attached hereto. There is no dispute between the applicant and the FCD over the technical aspects of the Staff Report. The protests of the applicant center around the length of the permit and some of the special provisions recommended in the Staff Report, which the applicant feels are vague and ambiguous. Mr. James A. Hinson, the applicant's corporate secretary, felt that the FCD had sufficient data and statistics as to the water resources and agricultural usage within the area to sustain the granting of a twenty year permit. It was further felt that the issuance of a two-year permit for the purpose of gathering information as to the quantity of use would tend to prompt higher usage and even lead to falsification of pumpage records on the part of agricultural users so as to assure the issuance of future permits. The applicant was also concerned with the costs of applying for another permit in two years. Mr. Nagendra Khanal, a hydrologist with the FCD, explained that the purpose of the two-year permit was to obtain information from agricultural users in the area as to the amount of water used and the effect of such usage on the Florida aquifer system. Since the outset of regulatory provisions, the FCD has set the same termination date for each permit for agricultural use within each of the basins. At that expiration time, the pumpage records for all users in the area will be established and present experimental estimates can then be compared with actual usage. Little is known by the FCD about how the Florida aquifer system operates and the data presently in use are experimental. Since all permits within each basin will expire on the same date, the entire basin can then be evaluated at one point in time. It was felt that if falsification of pumpage records were to occur, it could probably be detected by data currently available to the FCD. It was further opined by Mr. Khanal that at, the expiration date of all permits issued in each basin, an automatic conversion into new permits would occur at little or no cost to the applicant. With regard to the special provisions recommended in the Staff Report, Mr. Hinson expressed concern over the manner of compliance. Specifically, he desired more information on the type of equipment or devises required by the FCD when it calls for "minimum head pressures", and "a measuring device on each of the three wells." He also desired information as to the times of year the water quality analyses were to be performed. Mr. Khanal explained that no regulatory criteria had been established by the FCD with regard to pumpage and that the minimum type of measuring device, such as a time clock, on each of the wells would suffice. Further specifications will be supplied to the applicant upon request. It was explained by Khanal that the water quality analyses should be performed once before the rainy season (at the end of May) and once after the rainy season (at the end of October). There was some confusion over the inclusion of the parameter of "specific conductivity" within the definition of a standard complete water quality analysis. Finally, Mr. Khanal listed two amendments to be made in the Staff Report. On page 2, under "B. Existing Facilities", "3,500 gpm" should read "3,600 gpm." The last item on the chart on page 3 of the Staff Report should read "2 in 10 Year Drought" in lieu of "1 in 10 Year Drought."

Recommendation Based upon the findings of fact and conclusions of law recited above, it is recommended that Application No. 21424 be granted and that a permit be issued in accordance with the recommendations and provisions set forth in the Staff Report, as amended. Due to the apparent confusion over the inclusion of "specific conductivity" as a parameter to be included within the definition of a standard complete analysis, it is further recommended that the Staff make further inquiry into its necessity. If the Staff then concludes that "specific conductivity" is necessary to obtain a complete water quality analysis, it is recommended that it remain on the list of parameters. Respectfully submitted this 5th day of March, 1976, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of March, 1976 COPIES FURNISHED: Thomas C. Garwood, Jr., Esquire Akerman, Senterfitt, Eidson and Wharton 17th Floor CNA Building Orlando, Florida Stephen A. Walker, Esquire Post Office Box V West Palm Beach, Florida 33402

# 1
STANISLAW BUDZINSKI AND KAZIMIERA BUDZINSKI vs CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 97-001109 (1997)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Mar. 10, 1997 Number: 97-001109 Latest Update: Jun. 09, 1997

Findings Of Fact Lior Hason is the owner of Britt's Cafe, a restaurant which occupies property owned by the Petitioner's Stanislaw and Kasimiera Budzinski. On or about December 19, 1995, Harry S. Cline, an attorney for Mr. Hason and the Budzinskis, filed an application for a variance from the City of Clearwater's Development Code, for the purpose of eliminating three required parking spaces from the front of the subject property for the construction of an outdoor cafe at 201 South Gulfview Boulevard. The Code requires one parking space per 200 square feet of gross floor area, and a variance was required to remove three existing parking spaces from the unit's parking space inventory. The matter was brought before the City's Development Code Adjustment Board at its January 11, 1996 meeting. Mr. Cline appeared at the meeting on behalf of the applicant and presented the project. No one else was present to speak in support of or in opposition to the request. However, four letters in opposition from neighboring business owners were submitted. Notwithstanding these objections, the Board determined that the applicant had substantially met all standards for approval listed in the City's Land Development Code; and upon vote of the Board, the application was approved, subject to certain conditions, by a three to two majority. Mr. Hason entered into discussions with City officials to determine what was necessary. Official City reaction was initially favorable. Mr. Hason was advised of the requirements for the project and had plans drawn which called for a deck with a 35 to 36 inch railing with landscaping around it, and with posts and lights. When the plans were submitted to the City officials, the only change suggested was to raise the railing height to 45 inches, which was done, after which the City approved the plans and the permit was granted. The deck was then constructed exactly according to the approved plans. At some time during 1996, Mr. Hason discussed with some City employees putting an awning over the deck. During these discussions, the City employees sent Mr. Hason a copy of Section 41.221(1)(c), Clearwater City Code, which provides for awnings to be removable. Mr. Hason considered the sending of this Code provision to be tantamount to a favorable reply to his inquiry, and, based on that, he finalized his plans for the installation of a removable awning. The proposed awning is designed in such a fashion as to be extendible and retractable on a frame, capable of easily being pulled up against the front of the building like a drapery. With a minimum of further effort, consisting of the removal a several bolts, the entire awning construction can be removed from the frame. Mr. Hason submitted his application for the variance to install the awning on February 2, 1997. In the interim, the City employees with whom Mr. Hason discussed the project changed their position from favoring the project to opposing it. He was ultimately advised in December 1996 or January 1997 that the awning could not be permitted because an awning could not be approved over a deck for which a permit should not have been issued and for which the issuance was a mistake. Though the Board had not yet voted on the application, no information was given to Mr. Hason as to what he could do to make the project approvable. His application, on February 2, 1997, was submitted because, Hason claims, he had been told, by someone not further identified, that applying for a variance for the awning would make everything right. The Variance Staff Report submitted to the Board by the appropriate City employees acknowledged that the frame over which Mr. Hason proposed to put the awning does not meet code because it was constructed within a required setback area from South Gulfview Boulevard, but since the frame was built pursuant to a City-issued permit, consistent with City policy, the City accepted its existence. In its final recommendation to the Board, the staff concluded that notwithstanding the encroachment into the setback area, the project "appears to comply with all standards for approval, provided attention is given to the external appearance of the cafe:" The staff then went on to recommend approval of the project subject to certain conditions, all of which, Mr. Hason accepts and agrees to. Nonetheless, the Board denied the permit by a vote of four to one. Mr. Hason contends that the Board vote was an attempt by the Board to get back at him because of what it perceived as his failure to comply with the conditions placed upon the issuance of the first permit and his alleged misrepresentation of the scope of his project at the time. Mr. Hason, however, categorically denies he has done anything contrary to the dictates of the City. He went back to City officials many times during the construction of the deck to make sure the project was built as required. The majority of the Board members believe, however, that the deck as constructed, goes far beyond the limited structure approved by the granting of the parking space variance in January 1996. This animosity toward the project can be seen from a review of the audio record of the February 13, 1997, Board meeting where, during a colloquy between a Board member and Mr. Hason, it appeared the member was somewhat put out by the entire situation. His analysis indicates a less than complete recollection of the matter, however. Whereas one of the conditions to the issuance of the initial permit was that the area of the outdoor cafe should not be greater than 25 percent of the indoor area of the restaurant, this member pointed out that the 69 outdoor seats were far in excess of 25 percent of the 115 or so indoor seats. This constituted a confusion of seating as opposed to area. No evidence was presented concerning whether Mr. Hason had violated the area constraint. In the main, however, while it appeared that a majority of the Board members were unhappy about the way the project developed, and expressed the opinion that the project did not conform to what they had intended to approve, there was no indication any member s vote was motivated by anything other than a sincere belief in the correctness of his position. There was no indication of any inappropriate or vindictive action by anyone on the Board or its staff. Stephen Sarnoff, a central permitting specialist with the City reviewed the plans for the initial construction and for the current application. As he recalls, the plans for the initial deck construction did not show any support beams, fans, overhead structure or latticework fencing, and the deck, as built, does not conform to the plans as submitted. City Code requirements call for a railing of from 30 to 42 inches high. The current railing of 45 inches does not conform to that standard, and Mr. Sarnoff is not aware of any request from the City that the railing be raised to that height, as Mr. Hason claims. By the same token, while there is no requirement in the ordinance that a deck be of a certain height, anything higher than 12 inches is considered a structure and a waiver is required. This deck was approved for 12 inches. A certificate of occupancy is usually issued for a deck, but in the instant case, such a certificate has not been issued because the deck, as built, is not in compliance with the 1996 approval. If it is brought into compliance, it will be approved. Sarnoff is aware of and familiar with other outdoor restaurant decks built at various locations in the Clearwater area, as indicated by Mr. Hason. Some are not within the CR-28 zone and do not come under the same standards as are applicable here. Others, which must conform to the instant requirements appear to have movable awnings which are acceptable. Still others are in a different zoning district with different set-back requirements, and some were initially denied, but were subsequently approved when they were brought into compliance with the requirements. John Richter, a senior planner for the City, was the individual who prepared the staff report on the instant project and initially recommended approval, contingent upon changes to the external appearance of the facility. He made suggestions and has discussed the project with Hason on his several visits to the property. He did discuss an awning with Hason at some point, but their discussions did not deal with its mobility. All in all, Mr. Richter concluded that the project appears to meet the standard for approval, provided attention is given to the external appearance of the cafe. David S. Shuford, the City's central permitting director and development code administrator indicated that the variance required for the awning, which was an integral part of the structure already built, was not automatically granted with the granting of the permit for the deck structure. Section 42.221, Clearwater City Code, was adopted to promote a more festival atmosphere in some of the outdoor tourist areas. The intent of subsection (l)(c) of that provision was to require the use of moveable items and to design structures that would meet wind requirements and not interfere with pedestrian traffic. The term "moveable" means what it says, and in Shuford's opinion, from the plans he saw, the proposed awning would not be easily moveable on a daily basis. The Clearwater City Code establishes the area in question as one where, once guidelines are developed, they will be adopted and be complied with. Mr. Shuford opines that the current deck, in the rafter area, goes beyond what was proposed at the time the project was submitted for the parking variance and was approved. This is what appears to be the source of the difficulty the Board members have with it. However, if designed to comply with the guidelines, this awning could be approved. He would agree with the conditions outlined in the staff recommendation so far as they relate to painting and architectural matters.

Florida Laws (2) 120.57120.69
# 2
GROVE ISLE, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-002609 (1981)
Division of Administrative Hearings, Florida Number: 81-002609 Latest Update: May 05, 1982

Findings Of Fact The following findings are based on the uncontested facts alleged in Petitioner's Motion For Summary Recommended Order and from the Final Orders issued in Bayshore Homeowners Association v. Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. On December 29, 1980 DER entered a Final Order on the application of Petitioner for a 90 slip marina in Biscayne Bay, Florida. The Order denied the permit because Grove Isle had not demonstrated that the project is "affirmatively in the public interest" and because the applicant had not demonstrated that it "can meet ambient water quality standards within the project area itself." In the Recommended Order on Remand the Hearing Officer had defined "existing ambient waters" to be the area in the cove between Grove Isle and the Miami mainland. The Final Order rejected that concept and held if any waters others than those contained within the immediate project site were to be considered as ambient, Petitioner must request a mixing zone as part of its application. See Section 17-4.242, (1)(a)2.b. and Section 17-4.244, Florida Administrative Code. By a letter received at the Department of Environmental Regulation on May 20, 1981, Grove Isle reapplied for the boat dock permit which was the subject of the foregoing proceedings. Petitioner's application, which was in the form of a letter from counsel, stated: May 18, 1981 Mr. Larry O'Donnell Department of Environmental Regulation Post Office Box 3858 West Palm Beach, Florida 33402 RE: GROVE ISLE - Application for Boat Dock Dear Mr. O'Donnell: On behalf of Grove Isle, LTD, I am reapplying for the boat dock permit previously applied for by Grove Isle, LTD. Please consider this a short-form application. Your office designated a previous file number, DF 13-7956, to this matter. In conjunction with that application I am applying for a mixing zone, pursuant to Rule 17-4.244, for both the construction and operation of this marina. Please refer to your file on the previous application and incorporate said documents into this reapplication. I am submitting with this application: A scale drawing (one inch = 100') of the proposed facility. (which you have) A certified survey of the proposed mixing zone. (one inch = 100') An application fee of $20.00 A copy of the Final Order issued by Jacob D. Varn, former secretary of DER, on the previous application. A copy of the Notice of Intent previously issued for this project, dated 9/23/79. (which you have) As you will note from reading Mr. Varn's Final Order, he concluded that issuance of this permit was not appropriate inasmuch as the applicant had not applied for nor received a designated mixing zone. We do not necessarily agree with this order and have, in fact, appealed this decision to the First District Court of Appeal. However, in an attempt to keep this matter from becoming any more complicated, we have decided to reapply for the permit and to apply for a mixing zone. We do not concede that a mixing zone should be required for this project or that the facility will result in the release of any pollutants so as to significantly degrade ambient water quality. However, should this project, through its construction or operation, result in the release of any pollutants, I believe they would be limited to: Bottom sediments placed in suspension by the installation of the concrete piles used to support the docking facility during construction; Minimal amounts of oil and grease which may escape from the various vessels moored to the docks; The constituants of anti-fouling paint which may be applied to the hulls of the various vessels moored at the docks. Turbidity will be controlled by the use of curtains during construction. If lowered water quality occurs at all in this project it would only occur within the designated mixing zone, as per Rule 17-4.242 (2)(b) F.A.C. Please advise me should additional information be needed to process this re-application. Yours truly, /s/ KENNETH G. OERTEL On June 19, 1981, DER sent a "completeness summary letter" to Petitioner which requested the following information: Your project is in Outstanding Florida Waters. Please provide the following items demonstrating compliance with Section 17-4.242, Florida Administrative Code. Please demonstrate that this project is clearly in the public interest and that this project will not result in the degradation of ambient water quality beyond the 30 day construction period. Petitioner responded by letter dated June 22, 1981 and which was received at DER on June 25, 1981. Petitioner said in pertinent part: Dear Mr. Duke: If you would check your previous file no. DF-13-7956, I believe you will find all the information you have requested has previously been provided to your office either in that permit file or through the administrative hearings held in pursuit of this application. I think it would be more fruitful if you would communicate with Al Clark, Attorney for DER, with regard to the status of this application. As I do not wish to speak on behalf of Mr. Clark, I believe you should confirm the status of this application with him, particularly in view of our attempt to comply with Secretary Varn's Final Order which suggests the application for this mixing zone. The record reflects no further correspondence between the parties until September 23, 1981 when the Department entered a Final Order Denying Application for Permit. The Order provided that: This project was reviewed previously (DF 13-7956) and was determined not to be clearly in the public interest pursuant to Section 17-4.242, F.A.C. No further evidence upon resubmittal, has been provided to clearly demonstrate that this project is in the public interest. Furthermore, the requested mixing zone exceeds that allowable pursuant to Section 17-4.244, F.A.C. and can be applied only during the construction period, pursuant to Section 17-4.242, F.A.C. During the operation of this facility ambient water quality is expected to be degraded in violation of Section 17-4.242, F.A.C. This order was entered ninety-one days after DER received Petitioner's June 22, 1981 letter.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Environmental Regulation issue the permit applied for by Petitioner, Grove Isle, Ltd. on May 20, 1981 subject to the conditions contained in the Notice of Intent To Issue Permit dated October 23, 1979 which is a part of the record in Bayshore Homeowners Association et al., v. State of Florida Department of Environmental Regulation and Grove Isle, Inc., Case Nos. 79-2186, 79-2324 and 79-2354. DONE and RECOMMENDED this 12th day of February, 1982, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1982.

Florida Laws (2) 120.57120.60
# 3
VINCENT J. WOEPPEL vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-004063 (1992)
Division of Administrative Hearings, Florida Filed:Lake Wales, Florida Jul. 06, 1992 Number: 92-004063 Latest Update: Apr. 16, 1993

Findings Of Fact On December 12, 1991, Petitioner applied to the Respondent for a permit/water quality certification to grade and level, in stages, approximately 20,000 square feet or 0.45 acres of lake front to remove and prevent the formation of berms and depressions in the exposed lake bottom adjacent to his property. The project site is located at 3955 Placid View Drive which lies along the shoreline of Lake Placid, a natural waterbody in Highlands County, Section 24, Township 37 South, Range 29 East. Lake Placid is not an aquatic preserve, and is not an outstanding Florida water. It has been designated as a Class III waterbody. Petitioner's unsubdivided lot lies at the western end of Lake Placid. The shoreline measures approximately 203 feet. The western lot line also measures 203 feet, and fronts on Placid View Drive. The water level of Lake Placid has receded in recent years which allows large expanses of what was historically lake bottom to become beaches, lawns, and areas of habaceous marsh. The specific project which the Petitioner proposes calls for the leveling of the berms and depressions which form on the exposed lake bottom from collected water, which stagnates and permits various noxious creatures, including mosquitoes, to breed in them. The berms and depressions are approximately six inches high or deep and between one and three feet wide, and generally extend the length of the shoreline. The proposed area affected is approximately 20,000 square feet or 0.45 acres of lake front, although Petitioner proposes to actually level a much smaller area in stages of approximately 2,000 square feet on an "as needed" basis. No material other than sod in the beach area is proposed to be brought from or removed to off-site locations. Petitioner is highly sensitive to mosquito bites. The area proposed for leveling was previously cleared of vegetation without authorization. Very little revegetation of the shoreline has occurred since the area was cleared. Vegetation colonizing the beach, at present, includes pennyworts (Centella asiatica and Hydrocotyle umbellata) and water- hyssops (Bacopa sp.) Blue green algae was observed in the depressions which have formed along the shore since the clearing. Fauna observed on-site included gulls (Larus sp.), small fish in the adjacent lake shallows, and water-boatmen (Order Hemiptera) in the depressions. An area landward of the wetlands considered here was also cleared previously and is proposed to be seeded. An adjacent, uncleared shoreline was vegetated with primrose willow (Ludwigia sp.), cattail (Typha sp.), flat sedge (Cyperus odorata), and other wetland species for an almost 100% plant coverage. The Petitioner proposes to use a small tractor in leveling of the shore which will cause turbidity in the lake water. No turbidity controls were proposed by the Petitioner. Petitioner failed to provide reasonable assurances that the turbidity caused by the earthmoving equipment in areas presently above water would not cause degradation of water quality in Lake Placid; would not contribute to the long-term degradation of water quality in the lake caused by upland runoff that would flow into the lake without benefit of retention or filtration by shoreland vegetation (freshwater herbaceous habitat) which would be permanently removed under Petitioner's proposal. Nutrients such a nitrogen and phosphorus and pollutants such as pesticides, herbicides and other chemicals commonly used in lawn and garden care would be included in the runoff, and would have an adverse impact on fishing and marine productivity in the lake. The project would have a minor adverse impact on erosion and soil stabilization in the area surrounding the lake. Petitioner has failed to provide reasonable assurance that the proposed project is not contrary to the public interest. Petitioner can mitigate the project by eliminating the use of heavy equipment and substitute hand equipment to smooth out ruts, berms and depressions in jurisdictional areas.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Petitioner's application for Wetland Resource Regulation permit be DENIED. DONE and ENTERED this 8th day of March, 1993, in Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings ths 8th day of March, 1993. COPIES FURNISHED: Francine M. Ffolkes, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Mr. Vincent J. Woeppel 3955 Placid View Drive Lake Placid, Florida 33852 Daniel H. Thompson Department of Environmental Regulation Acting General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Virginia B. Wetherell Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 120.57211.32267.061
# 4
STRAZZULLA BROTHERS, INC. vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 82-001639 (1982)
Division of Administrative Hearings, Florida Number: 82-001639 Latest Update: Jun. 21, 1991

Findings Of Fact The property has been annexed into the Acme Improvement District (Intervenor) by Special Act of the Florida Legislature. Petitioner purchased 487.7 acres of this tract from private owners in 1954. Subsequently, Petitioner purchased 653.59 acres from the Trustees of the Internal Improvement Fund of the State of Florida on or about March 4, 1960. The balance of the land constituting the property is a 224 acre hiatus tract owned by Marshall Brown with whom Petitioner has an agricultural use agreement. A parcel of Petitioner's land within the property includes a commercial lease to Malrite Corporation for siting a television antenna, consisting of 111 acres in the southeast corner of the property. This area is within the permit application. The tract is otherwise undeveloped and is currently submerged or semi- submerged during much of the year. Petitioner's development plan envisions drainage of this tract and use of the property for cultivation. The property is bounded on the north by Acme Improvement District, on the east by a subdivision called Homeland, on the west by Water Conservation Area #1, also known as the Loxahatchee Refuge, and on the south by undeveloped lands. The boundaries of the Loxahatchee Refuge actually encroach by approximately 300 feet into the property. The property development plan, which is the basis of this application, was prepared by the engineering firm Gee and Jensen. This plan calls for the creation of a 240 acre reservoir of a proposed 3 foot maximum depth. This reservoir would hold the internal stormwater runoff for subsequent agricultural irrigation. Perimeter dikes are to be constructed to prevent surface water runoff from outside areas entering the project and perimeter ditches are to be developed for the deliverance of stormwater runoff from the internal agricultural system to proposed pump stations located at the southwest corner of the development area. On the northwest corner of the proposed reservoir, the existing Acme Improvement District pump station No. 2 would be increased in capacity by 27,000 gallons per minute. Under Acme's charter and its statutory annexation of the property, the proposed reservoir and water management works would become a unit of development controlled by Acme. Under Petitioner's agreement with the hiatus tract owner, Acme would be the exclusive manager and operator of the proposed system, and the property would become an integral part of Acme's water management system. The Acme Water Improvement District is not solely an agricultural support enterprise but serves the various uses which may evolve within its boundaries. The area is currently zoned for limited residential development as well as agricultural. The television antenna facility located on the property is an example of a non-agricultural use. Petitioner's surface water management system is proposed to discharge into the Acme system, which in turn discharges offsite. Discharge into the Acme system is of a limited nature, but the system is designed to discharge for successive days under wet conditions. The design discharge is not limited to an extreme rainfall event but would probably occur during the traditional hydrologic cycle of south Florida. Under conditions which reflect actual rainfall over the past 20 years, the proposed surface water management system would have discharged 19 out of 20 years into the Water Conservation Area (Loxahatchee Refuge). In some years this discharge would have continued for approximately three months. The unrebutted testimony of expert witnesses called by Respondent established that the entire 1,393 acre tract referred to herein as "the property" is a freshwater wetland habitat. The western half is emergent marsh land, while the eastern half is forested with woody species. The wetlands on the property form a valuable wildlife habitat. Environmentally, they are in excellent condition. This area has not been adversely affected by drainage, fire or exotic species. These marshes also have good habitat diversity. The populations of aquatic invertebrates and forage fishes that are produced in these Everglades marshes are utilized by the many species of wading birds that feed in these wetlands. The proposed project will adversely affect wildlife species, including a variety of wading birds which will likely be unable to relocate. While this is undesirable from an environmental standpoint, conversion of this land would provide benefits from an agricultural standpoint, and would create additional water recreational facilities.

Recommendation From the foregoing, it is RECOMMENDED: That Respondent enter a final order denying the application. DONE and ORDERED this 30th day of November, 1983, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of November, 1983.

Florida Laws (6) 120.60373.044373.116373.403373.406373.413 Florida Administrative Code (3) 40E-1.60340E-4.09140E-4.301
# 5
JAMES D. ENGLISH, JR., AND CYPRESS CREEK PARTNERSHIP vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT AND TELEGRAPH CYPRESS WATER MANAGEMENT DISTRICT, 92-006900 (1992)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Nov. 18, 1992 Number: 92-006900 Latest Update: Jul. 10, 1995

The Issue Whether the application of Telegraph Cypress Water Management District to modify an existing surface water management system permit should be granted.

Findings Of Fact The South Florida Water Management District (District) is a public corporation in the State of Florida existing pursuant to Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 373, Florida Statutes, and Chapter 40E, Florida Administrative Code. The District is a multipurpose water management agency with principal offices in West Palm Beach, Florida. Telegraph Cypress Water Management District (TCWMD) is a water control district organized pursuant to Chapter 298, Florida Statutes. Agricultural operations have been conducted within the TCWMD for more than 30 years by the landowner, Babcock Florida Company. The TCWMD is the permittee of record. James D. English, Jr., owns, along with other members of his family, an orange grove and pasture in Lee County, Florida. The English family has owned the property for approximately 120 years. On November 10, 1992, James D. English, Jr., and the Panacea Timber Company filed a petition for formal administrative hearing challenging the District's intent to issue SWM Permit Modification No. 08-00004-S. Cypress Creek Partnership is a Florida General Partnership of which James D. English, Jr., is a principal. The partnership engages in agricultural activities in Lee County, Florida. The Alva Cemetery, Inc., is a Florida not-for-profit corporation which owns and manages a cemetery facility in Lee County Florida. The cemetery has been in active use for approximately 120 years. In recent years, Alva Cemetery has experienced occasions of excess water encroaching onto the cemetery property. On November 12, 1992, Alva Cemetery, Inc., filed a petition for administrative hearing challenging the District's intent to issue SWM Permit Modification No. 08-00004-S. James D. English, Jr., Cypress Creek Partnership and Alva Cemetery, Inc., are herein referred to as Petitioners. The TCWMD and the Petitioner English share a common property boundary. The Alva Cemetery is surrounded by the English property. All lands involved in this matter historically drain towards the Caloosahatchee River. The TCWMD includes approximately 89,120 acres of land located in Charlotte and Lee Counties, Florida. The land uses within the TCWMD include agricultural, cattle, and timber operations. Generally, the fields have been leased to third party farmers who use the field for several years. When the fields are not actively farmed, they are returned to a fallow state and used as pasture land until fertility is restored at which time they are reactivated for farming. Active farms fields are generally surrounded by a perimeter ditch and dike system. Pumps may be used to water and de-water the fields. When the field is returned to a fallow state, the ditch and dike system are not maintained and become less prominent either by action of weather or by intent. Pumps are not present. All of the TCWMD lies generally north to northwest of the property owned by the Petitioners. Surface waters flow onto the Petitioners' lands from the north. The Telegraph-Cypress system is unique and is the largest of its kind in South Florida Water Management District jurisdiction. The TCWMD system includes storage/detention facilities, control structures, pumping stations and an extensive network of internal canals. There are nine separate water management basins within the TCWMD. The Petitioners asserted that the water management basins identified by the District and the TCWMD are incorrect. The greater weight of the evidence establishes that the District's identification and delineation of the nine basins is based on historical hydrologic characteristics of the TCWMD and is a reasonable determination of basin boundaries. The land encompassed by the instant application for permit modification includes three of the nine basins and encompasses approximately 51,400 acres of the TCWMD. Surface water discharge from the relevant farm fields flows via the internal canal network and sheet flow to the three common detention basins: Telegraph Swamp, North Telegraph Swamp ("Telegraph North") and Curry Lake. The Telegraph North basin lies to the north of and discharges into the Telegraph Swamp basin and includes 13,799 acres of which 4,094 acres are farm fields. The drainage into the Curry Lake basin does not impact either the Telegraph North or Telegraph Swamp basins or the Petitioners' properties. The evidence establishes that as to the Telegraph North and Curry Lake drainage basins, the permit modification meets applicable permitting criteria. There is no credible evidence to the contrary. Telegraph Swamp is the largest of the three relevant detention systems. The Telegraph Swamp basin includes a total of 32,707 acres of which 4,381 acres are farm fields. Telegraph Swamp is a 4,390-acre wetland vegetated by cypress trees and sawgrass, with a base of muck soils, humus, topsoil, leaf litter and other organic material. Located at the south end of Telegraph Swamp are surface water management control structures (the Big Island Dike) built in 1975 and permitted in the original 1980 permit. The structures include three broad-crested weirs and one flash-board weir. Telegraph Swamp has been compared to a "sponge" capable of absorbing vast quantities of surface water discharges within the TCWMD before the control structures at the south end of the swamp are over-topped. Water discharged from the control structures flows through canals and creeks to the Caloosahatchee River. During storm events water is discharged over the control structures and into a swamp area south of Big Island Dike. From there, the water flows southerly, into Telegraph Creek, Big Island Canal and Cypress Creek and then into the Caloosahatchee. The Petitioners expressed concern that TCWMD could inappropriately discharge water from the control gates in the Telegraph Swamp weir. Based on evidence admitted at the hearing, the permit modification should include the following special condition: Discharge structures in the Telegraph Swamp basin shall remain fixed so that discharge cannot be made below the control elevations, except that structure gates and weirs may only be removed during emergency conditions upon notification to and consent by the District's Fort Myers Service Center regulatory area manager or designee. The Basis of Review for Surface Water Management Permit Applications within the South Florida Water Management District--September 1989, incorporated into Chapter 40E, Florida Administrative Code, provides the applicable water quantity permitting criteria relevant to this proceeding. The Petitioners assert that the control gates are required to be locked in accordance with Basis of Review section 3.2.4.1.b, which states: Discharge structures shall be fixed so that discharge cannot be made below the control elevation, except that emergency devices may be installed with secure locking devices. Either the District or an acceptable govern- mental agency will keep the keys for any such devices. The Petitioners are correct. The rule requires secure locking devices. Such condition should be added to the permit The keys may remain with the TCWMD as "an acceptable governmental agency." In 1980, the District issued Surface Water Management Permit No. 08- 00004-S for the TCWMD to operate an existing surface water management system for an existing agricultural operation. The 1980 permit specifically authorizes "[o]peration of a water management system serving 89,120 acres of agricultural lands by a vast network of internal drainage and irrigation canals, a major dike, a major canal and 4 water control structures discharging via small tributary creeks and sloughs into the Caloosahatchee River." Although the permit has been subsequently modified, the authorization to operate the system has not been amended. While District enforcement staff have occasionally noted "performance deficiencies" on the TCWMD property, there have been no permit violations by the permittee. Deficiencies which have been called to the TCWMD's attention have been resolved. Special condition number five to the 1980 permit provides that "[d]ischarges of water onto adjacent lands may be continued to the extent that increased problems are not caused by such discharges." The Petitioners assert that the District has failed to acknowledge that water discharged from the Telegraph Cypress system flows into the Cypress Creek canal and has failed to consider the impact on the Cypress Creek receiving body. However in the staff report to the 1980 permit states as follows: The Telegraph Cypress basin has three major drainage outlets. These are Trout Creek on the west, Telegraph Creek in the center and Cypress Creek to the east. There is a fourth outlet in the northeastern corner of the property known as Jack's Branch, however, this outlet is small compared to the three major ones. Much of Telegraph's southeastern area was previously drained by Spanish Creek and County Line Canal. This historical drainage pattern was blocked when a company which is presently known as Golden Grove constructed a dike across their northern boundary. This dike causes increased flow in a westerly direction around the west end of the dike, thence southerly towards Cypress Creek. This increased flow has caused excess water problems to property owners downstream. In addition, the dike has blocked virtually all flow to Spanish Creek. The evidence fails to establish that, as asserted by the Petitioners, the District has failed to acknowledge the discharge of water to Cypress Creek or to consider the condition of the Cypress Creek receiving body. In the instant case, the condition of the Cypress Creek receiving body was not re- addressed because the permit modification being sought will cause no additional adverse impacts on existing conditions. Although not individually numbered and identified in the original 1980 permit, the evidence establishes that in 1980, all of the farm fields which are subject to this permit modification application were in existence. The applicant seeks no new water control structures. Other than that required to reactivate fallow farm fields, there is no new construction proposed in the instant application. The Petitioners assert that the instant permit modification application will result in construction of new farm fields. The evidence is contrary to the assertion. Proposed permit special condition No. 10 states that the permit does not include the construction of any new farm fields. The farm fields covered in the staff report would be permitted for reactivation from a fallow state without further permitting activity in the future, and without individual retention for each farm field. The modifications to the original 1980 permit have increased the total farm land area. There is no evidence that, except as specifically permitted and approved by the District, there has been alteration of historical discharge rates or routes. There has been considerable confusion regarding the permitting status of the operations as farm fields have been reactivated. Such reactivation entails grading and leveling fields, reconstruction of ditches and dikes and installation of pumping equipment. In order to provide for standardization in farm field reactivation, and to better monitor such activities, the District requested that the TCWMD seek to modify the existing permit. On February 8, 1991, the TCWMD submitted an application to modify the existing permit for the purpose of reactivating the existing farm fields located within the Telegraph North, Telegraph Swamp, and Curry Lake drainage basins. The proposed SWM permit modification authorizes the continued use of the previously permitted surface water management system for existing active and fallow farm fields and allows the reactivation of currently fallow farm fields without further permit modification by the District. Proposed SWM permit special condition No. 16 states that the District requires notification in letter form 30 days prior to all farm field reactivation activities. The proposed modification of the permit will provide the District with an enhanced ability to inspect the reactivated farm fields. Inherent in such reactivation is ditching and diking of the fields. Such operations have been authorized since the 1980 permit was issued. The work associated with field reactivation will be conducted in accordance with existing design criteria as set forth in the application. Based on evidence admitted at the hearing, the permit modification should include the following special condition: Ditches and dikes associated with the farm fields encompassed by this authorization shall be constructed/maintained in conformance with the "Typical Field Layout And Detail Sheet," revised 10/12/93. The evidence establishes that the operations of the TCWMD as proposed by the permit modification application are within the authorization of the existing permit as previously modified. Otherwise stated, the award of this modification will have no substantial impact on the operation of the permitted surface water management system. The modification will result in no additional discharge of surface water from the control structures. The District has established water quantity criteria intended to insure that adverse impacts do not occur due to excess discharge. (Based upon the Hearing Officer's ruling on a District's Motion in Limine, water quality issues were not addressed at hearing.) The criteria are set forth at Chapter 40E-4.301, Florida Administrative Code, and in the Basis of Review. In relevant part, the District criteria require an applicant to provide reasonable assurances that the surface water management system provides adequate flood drainage and protection, that the system will not cause adverse water quantity impacts on receiving waters and adjacent lands, and that the system will not cause adverse impacts on surface and groundwater levels and flows. Modification of a permit must not result in additional adverse off-site impacts. In this case, reasonable assurances have been provided that the proposed modification will not exacerbate the historical and current drainage conditions. The permit modification application at issue does not propose to alter the rates or routes of water currently authorized for discharge from Telegraph Swamp. Reactivation of the farm fields will not impact receiving bodies in any manner different from that which presently exists under previous permits. In providing reasonable assurances, the TCWMD analyzed the water storage capacity available in the detention basins, performed flood routing projections and calculated peak discharge rates for the permit area. As required by the district, the TCWMD utilized a standard hypothetical 25-year/3- day storm event in order to determine whether sufficient capacity was available to handle the resulting stormwater. The projections provide reasonable assurances that the common detention areas have the capacity to provide adequate flood drainage and protection and are accepted. Rule 40E-4.091(1)(a), Florida Administrative Code, incorporates by reference a document identified as the "Basis of Review for Surface Water Management Permit Applications within the South Florida Water Management District--September 1989" Section 3.2.1.2.b requires that: the proposed project modification must meet the allowable discharge rate; and the allowable discharge rate for a previously permitted project is that which was set in the previous permit. The TCWMD prepared and submitted discharge calculations establishing that the post-development discharges will not exceed the discharge rate previously accepted by the District. Since 1984, the District has previously accepted a peak allowable discharge rate of 39 cubic feet per second per square mile (csm). The csm figure is based upon the historical TCWMD discharge rate within the Caloosahatchee River basin. As previously stated, reactivation of the farm fields will not impact the receiving bodies in any manner different from that which presently exists under previous permits. The District asserts that the 39csm discharge rate has been "permitted" since the 1984 modification was approved. The Petitioner asserts that the 39csm discharge rate has never been "permitted" by the District. The evidence establishes that since the 1984 application for permit modification, the discharge rate of 39csm has been utilized by TCWMD and has been accepted by the District, but that the actual permits do not specifically identify the discharge rate as 39csm. In projecting discharge rates, the TCWMD used a time of concentration of one hour. The time of concentration (T.O.C.) is the time in which water would move from the farm fields to the control structure in each sub-watershed. Otherwise stated, a projected T.O.C. of one hour means that the storm water would move from the field to the control structure in one hour. The T.O.C. of one hour is a conservative estimate and likely substantially overestimates the speed at which the water will move. The three basin areas contain a total of more than 80 square miles. Water will travel an average distance of two miles from field to detention basin through ditches, swales and existing low areas. Again conservatively, the TCWMD did not include projected travel time through such conveyances, resulting in a longer T.O.C. and resulting in a higher peak discharge rate than is probable. Although there appeared to be some confusion on the part of the District staff as to the application of the T.O.C. by the TCWMD, the TCWMD engineer who performed the calculation testified at hearing and was qualified as an expert witness in civil engineering, hydrology and surface water management. His testimony and projections are reasonable and are credited. Proposed SWM permit modification special condition No. 11 states that farm field discharge shall be directed to and conveyed via existing ditches, wetlands and/or sheetflow areas per existing site conditions. No new outfall ditches are permitted under this modification. Flood routings were calculated assuming all farm fields would be activated simultaneously and pumping the maximum capacity of 390 gallons per minute per acre (the equivalent of 20-21 inches of surface water pumped from each field daily). It is highly unlikely that all farm fields would be active simultaneously or that stormwater would continue to fall with such velocity to permit continued pumping at maximum capacity for an extended period. Even based on the conservative assumptions utilized by the TCWMD engineers, the projected peak discharge rate at the Telegraph Swamp control structure is 37csm to 38.5csm, within the maximum of 39csm previously accepted by the District. The computer modeling performed by the TCWMD engineer in calculating the peak discharge rate is accepted as reasonable. The TCWMD did not include offsite inflow in its analysis of projected capacity or discharge rates. There is anecdotal evidence that on occasion, water may flow into TCWMD from Jack's Branch or from across roadways to the north and west of the TCWMD; however, given the vast storage capacity of the TCWMD detention areas, there is no evidence that the quantity of offsite inflows is of such significance as to render the TCWMD projections unreasonable. As previously stated, the TCWMD calculations are reasonable and are accepted. The evidence establishes that the peak discharge rate resulting from approval of the instant permit modification will not exceed 39csm. The Petitioners offered their own peak discharge rate calculations, based on a "worst possible case scenario." The assumptions on which the Petitioners' projections are based are unreasonable and are rejected. Based on recommendations received at the hearing, the permit modification should include the following special condition: Pumped discharge from farm fields for which pumps are not currently installed shall be limited to 75 gallons per minute per acre of farmed area. Pumps are currently installed in fields number 7, 8, 9, 10, 12, 14, 15, 24 north and south, 28, east half of 34, 64, 67, 68, 69 and 80. The Petitioners assert that the system is currently causing adverse impacts to their properties in the form of flooding. The greater weight of the evidence establishes that the system presently does not cause adverse water quantity impacts on receiving waters and adjacent lands, and does not cause adverse impacts on surface and groundwater levels and flows. The evidence establishes that award of the application for permit modification will not adversely alter the current operations. It is clear that the Petitioners have been impacted by changes in the historical drainage patterns in the area; however, such changes had substantially occurred by 1980 when the original permit was issued. The greater weight of the credited evidence establishes that such impacts are not the result of the activities authorized in the original 1980 permit and in subsequent modifications, but instead are the result of unrelated actions by third parties not involved in this administrative proceeding. There is no credible evidence that the permit modification sought in the instant proceeding will adversely affect the Petitioners. The 1980 permit addresses existing water quantity problems in the area of the TCWMD project. For example, the construction of the Golden Grove Dike resulted in blockage of historical drainage towards Spanish Creek and the diversion of excess waters into Cypress Creek. During the 1980's the District required that culverts be installed in the Golden Grove Dike which eventually restored some surface water flow through the dike construction and on towards the south, although during some storm events water flow continues around the dike and into Cypress Creek. The Petitioners offered anecdotal evidence as to reduced water flows in some local creeks and increased flows thorough Cypress Creek. The Respondent offered evidence indicating that water flow through Cypress Creek may be less than 30 years ago, due to the digging of a canal between Spanish Creek and Cow Slough and the extension of the Clay Gully Canal's diversion of water into Telegraph Swamp. None of the evidence on this point was persuasive, however it is not relevant. Clearly, the instant permit modification application will not adversely affect the existing situation in the receiving bodies. The Petitioners assert that other receiving waterways have become clogged with vegetation, debris or soil, have accordingly reduced capacities, and are unable to accommodate historical discharge levels. Based on the lack of capacity, the Petitioners suggest that waters move towards the eastern portion of Telegraph Swamp and are discharged, flow towards, into and over the banks of Cypress Creek, and flood their properties. The TCWMD conducted a study of backwater profiles based upon credited field data. The study is found to be reasonable and is credited. Based upon the study, approximately 90 per cent of the water discharged from Telegraph Swamp is conveyed to the Caloosahatchee via Big Island Canal, Telegraph Creek and the swamp area south of the control structure. The remaining 10 per cent of the water enters the Bullhead Strand-Lightered Canal-Cypress Creek watercourse. Water flows from Telegraph Swamp into Cypress Creek via Bullhead Strand and the South Lightered Canal, however, the canal has become so restricted by vegetation that it provides little direct water flow between the strand and the creek and is more properly regarded as an area of enhanced sheet flow. The evidence does not establish that the surface water traveling from Bullhead Strand to Cypress Creek is of significance. Coupled with the existence of the Big Island Canal (which connects Telegraph Swamp to Telegraph Creek) it is unlikely that post-development surface water discharged from the Telegraph Swamp into Cypress Creek exceeds pre-development discharges. The Petitioners claim that two culverts in the Big Island canal restrict the flow of water through the canal and result in increased discharge to the east and to Cypress Creek. The greater weight of the evidence establishes that during period of time when the culverts are unable to accommodate water flow, the water travels into a broad flood plain, around the culverts and returns to the Big Island Canal. The evidence establishes that the proposed modification will not result in additional adverse off-site impacts. The adverse conditions affecting Cypress Creek existed at the time of the 1980 permit and are addressed in the staff report to that permit and to subsequent permit modifications. There is no credible evidence that modification of the permit as sought in this case will result in adverse impacts beyond those which have existed at the time of the award of the original permit. The Petitioners assert that the fields included within the permit modification application lack individual retention areas. The lack of individual detention areas is immaterial in this case where sufficient downstream detention capacity is available through the common detention areas. The Petitioners asserts that the Telegraph Swamp is an "above-ground impoundment" and that as such is fails to comply with requirements related to such water storage systems. The Telegraph Swamp is not a typical "above-ground impoundment" as that term is routinely applied by the District. The regulations addressed by the Petitioners clearly state that they are not intended to be inclusive and are intended to provide guidelines and basic performance criteria for commonly encountered south Florida situations. Telegraph Swamp is not a commonly encountered south Florida situation. There is no evidence that the decision not to apply the "above-ground impoundment" regulations to the Telegraph Swamp is unreasonable. The Petitioner suggest that the TCWMD application for permit modification is deficient and fails to provide information in compliance with the Basis of Review. The Basis of Review is directed towards applications for new construction. The District reasonably does not interpret the all elements of the Basis of Review to apply to existing operations. The original staff report for this permit modification application fails to acknowledge that Cypress Creek is a receiving body. However, as stated previously, the 1980 application and subsequent modifications have clearly addressed the fact that Telegraph Swamp waters discharge to Cypress Creek via intervening waterways. The failure to include the reference in the staff report to this application for modification is irrelevant.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the South Florida Water Management District enter a Final Order issuing Surface Water Management Permit Modification No. 08-00004-S including the additional permit conditions set forth herein, to the Telegraph Cypress Water Management District. DONE and RECOMMENDED this 1st day of April, 1994 in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of April, 1994. APPENDIX TO RECOMMENDED ORDER, CASES NO. 92-6900 and 92-6901 To comply with the requirements of Section 120.59(2), Florida Statutes, the following constitute rulings on proposed findings of facts submitted by the parties. Petitioners James D. English and Cypress Creek Partnership The proposed findings of fact submitted by Petitioners James D. English and Cypress Creek Partnership consist of unnumbered paragraphs. Pages forty-five through fifty-nine of the proposed findings of fact submitted by Petitioners James D. English and Cypress Creek Partnership were stricken as set forth in the Order On Motion To Strike issued March 29, 1994. The paragraphs of pages five through forty-four of the proposed findings of fact submitted by Petitioners James D. English and Cypress Creek Partnership have been consecutively numbered and are accepted as modified and incorporated in the Recommended Order except as follows: 1-2. Rejected, argument, not findings of fact. 7-9. Rejected, argument, not findings of fact. The staff report is not dispositive. 10-12. Rejected. The greater weight of the evidence establishes that, although the 39csm figure is not set forth in the permit, as of the 1984 modification, the TCWMD calculations have been based on a peak discharge rate of 39csm and that the District has accepted the calculations previously. The applicable criteria in the instant case require that the allowable discharge rate for a previously permitted project is that which was set in the previous permit. 13. Rejected, recitation of testimony is not finding of fact. 15-16. Rejected, argument, not finding of fact, irrelevant, cumulative. 17-18. Rejected, recitation of testimony is not finding of fact. 19. Rejected, contrary to the greater weight of credible and persuasive evidence which establishes that 39csm has been the peak discharge rate accepted by the District since 1984. The flow rate projected by the TCWMD does not exceed the accepted peak discharge rate. 24. Rejected, recitation of testimony is not finding of fact. 26-28. Rejected, recitation of testimony is not finding of fact. 29-30. Rejected, argument, not finding of fact. Rejected, irrelevant. Rejected, argument, not finding of fact. Rejected, irrelevant. The greater weight of the credible and persuasive evidence establishes that 39csm has been the District's accepted peak discharge rate and that this modification will not result in peak discharge rates in excess of that which has been previously accepted. Rejected, not supported by the greater weight of credible and persuasive evidence. The assumptions underlying the Petitioners' calculation of theoretical maximum discharge are rejected as unreasonable. Rejected, unnecessary. 36-45. Rejected, irrelevant. The anecdotal evidence fails to establish that offsite inflows are of such quantity as to render the TCWMD projections unreasonable. The proposed findings also consist of recitation of testimony or argument and are not findings of fact. 46-52. Rejected, contrary to the greater weight of credible and persuasive evidence. The evidence fails to establishes that the swamp is an "above-ground impoundment" as that term is routinely applied by the District. The proposed findings also consist of recitation of testimony or argument and are not findings of fact. 53-67. Rejected, irrelevant. An applicant for a permit modification is not required to supply every item on the checklist. An application for a modification to an existing permit often need not contain all the items described. 69. Rejected, cumulative. 70-71. Rejected, argument, not finding of fact. 72-81. Rejected, not supported by the greater weight of credible and persuasive evidence which establishes that the identification and delineation of the nine basins is based on historical hydrologic characteristics of the TCWMD and is a reasonable determination of basin boundaries. The proposed findings also consist of recitation of testimony or argument and are not findings of fact. 82. Rejected, subordinate. 83-85. Rejected, irrelevant. The confusion on the part of District staff as to what T.O.C. was utilized by the TCWMD engineer is irrelevant. This proceeding is not a review of preliminary staff activity. The applicant must establish entitlement to the permit at the hearing. 86-87. Rejected, recitation of testimony is not finding of fact. Rejected. The confusion on the part of District staff as to what T.O.C. was utilized by the TCWMD engineer is irrelevant. Rejected, unnecessary. Rejected, recitation of testimony is not finding of fact. 91-94. Rejected, irrelevant, the discharge projections calculated by the TCWMD as explicated at the hearing are credited. In any event, the evidence establishes that this modification will result in no additional discharge of surface water from the control structures. 95-97. Rejected, irrelevant. The evidence establishes that this modification will result in no additional discharge of surface water from the control structures. Petitioner Alva Cemetery Petitioner Alva Cemetery's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 2. Rejected, not supported by the greater weight of credible and persuasive evidence. 4-5. Rejected, irrelevant. Rejected, irrelevant. This is a de novo hearing, not a review of preliminary staff work. The evidence at hearing establishes that the permit modification will not cause additional adverse affect on existing receiving bodies. Rejected, irrelevant. The evidence fails to establish that Hall Creek and Fichter Creek are receiving bodies of such capacity that their omission from staff report is material. Rejected, irrelevant. Rejected, irrelevant. The evidence fails to establish that offsite inflows are of such quantity as to be relevant. 11. Rejected, not supported by the greater weight of credible and persuasive evidence. The Applicant's analysis is credited. As to T.O.C., even the less conservative T.O.C. projections indicate a peak discharge rate within that previously accepted by the District. 12-13. Rejected, irrelevant. Rejected, irrelevant. Such return overflows are unnecessary in this situation where the detention areas have the capacity to provide adequate flood drainage and protection. Rejected, not supported by the greater weight of credible and persuasive evidence. Rejected, not supported by the greater weight of credible and persuasive evidence. 18-20. Rejected, cumulative. 21. Rejected, immaterial. There is no evidence that this permit modification application will cause additional adverse impact on receiving bodies. The failure to address nonexistent impacts is immaterial. Rejected, errors in staff report are irrelevant. The evidence admitted at hearing is accepted as correct. First paragraph is rejected, cumulative. Second paragraph is rejected, not supported by the greater weight of credible and persuasive evidence. Rejected, anecdotal testimony is not supported by the greater weight of credible and persuasive evidence. Rejected. The greater weight of credible and persuasive evidence establishes that all farm fields affected by this permit modification application were in existence by the 1980 permit. Rejected, not supported by the greater weight of credible and persuasive evidence. The assumptions underlying the Petitioners' calculation of theoretical maximum discharge are rejected as unreasonable. Rejected, irrelevant. The greater weight of credible and persuasive evidence fails to establish that the cemetery flooding is related to actions by the TCWMD. Further, the evidence fails to establish that, even if the flooding was related to the TCWMD, the instant permit modification application will cause additional adverse impacts. Respondent Telegraph Cypress Water Management District Respondent Telegraph Cypress Water Management District's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 18. Rejected, subordinate. 19-20. Rejected, not credited and unnecessary. Rejected as to assertion that the 39csm discharge rate was set in the 1984 permit modification, not supported by the evidence. Review of the document admitted into evidence as the 1984 modification fails to reveal that the figure of 39csm is set forth therein. Rejected, cumulative. Rejected, unnecessary. Respondent South Florida Water Management District Respondent South Florida Water Management District's proposed findings of fact are accepted as modified and incorporated in the Recommended Order except as follows: 30. Rejected as to assertion that the 39csm discharge rate was set in the 1984 permit modification, not supported by the evidence. Review of the document admitted into evidence as the 1984 modification fails to reveal that the figure of 39csm is set forth therein. Pages 17-19 of the Proposed Recommended Order set forth revisions to the staff report which originally form the basis for the preliminary agency action in this matter. As the hearing is a de novo review of this matter, it is unnecessary for this Recommended Order to address the revision of the staff report, which has limited probative value. COPIES FURNISHED: Tilford C. Creel Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416 Melville G. Brinson, Esquire 1415 Hendry Street Fort Myers, Florida 33902 Frank A. Pavese, Sr. Esquire 1833 Hendry Street Fort Myers, Florida 33902 Scott Barker, Esquire Post Office Box 159 Fort Myers, Florida 33902 John J. Fumero, Esquire Toni M. Leidy, Esquire South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33416

Florida Laws (7) 120.57120.68373.114373.413373.617380.06403.812 Florida Administrative Code (4) 40E-4.09140E-4.10140E-4.30140E-4.331
# 6
FRED THOMAS vs. CITY OF CLEARWATER AND ANTONIOS MARKOPOULOS, 88-001191 (1988)
Division of Administrative Hearings, Florida Number: 88-001191 Latest Update: Jun. 06, 1988

Findings Of Fact Fred Thomas owns a home and lot on the beach in Clearwater at 730 Eldorado Avenue, Mandalay Subdivision, Block 2, Lot 8, now zoned RS-8 (single family residential). The Thomas house was built 30 years ago when front yard setbacks for the area were only 10 feet and there were no open space requirements. Now the front setback in the area is 25 feet, and Section 135.029(8) of the Clearwater Land Development Code now requires lots in RS-8 zones to have a minimum open space of 35 percent of the lot and 40 percent of the front yard. There are many properties in the area of the Thomas house that maintain pre- existing non- conformities to the current setback and open space requirements. The Thomas property, in addition to the pre-existing setback non-conformity, had only 26 percent open space overall and no open space at all (all concrete) in the front yard. In 1987, Thomas undertook renovations to his house. During construction, Thomas' concrete front yard deteriorated from additional cracking, and he decided to replace the concrete with brick pavers. He removed the concrete but then was required to get a building permit for this work. The building permit was not granted because the placement of brick pavers in the front yard violated the open space requirements. Thomas applied for a variance to replace the concrete with brick pavers and later modified the application to be allowed to have 29 percent lot coverage and 12 percent front yard coverage with open space. The modified application was denied by the DCAB after hearing on February 11, 1988, and Thomas took this appeal. Thomas also filed another variance application to be allowed to have 30 percent lot coverage and 16.8 percent front yard coverage with open space. This application was heard on March 10, 1988, and this time the DCAB granted the application. The only open space required under the granted variance not required under the denied variance application is a 10' by 10' square on the far left side of the front yard (facing the house). Thomas claims that this open space requirement prevents him from using a narrow concrete alley to the left of the house (and perhaps the concrete apron in the back of the house) for guest parking, leaving him with a two-car garage and the brick paved area directly in front of the garage that could accommodate two cars but would block the garage. Lack of guest parking would create a hardship of sorts on Thomas. There is no on-street parking in the area, and the Clearwater Police vigorously patrol and ticket violators in the area. The brick paved spaces in front of the garage could be inconvenient to the owners of the vehicles parked in the garage (probably the Thomases) and conceivably could block the cars in the garage temporarily under some circumstances. However, Thomas is incorrect in his presumption that guest parking in the alley and back of the house would be blocked by the 100 square feet of open space required under the granted variance but not under the denied variance application.

# 7
BRENDA B. SHERIDAN vs DEEP LAGOON MARINA, A/K/A DEEP LAGOON BOAT CLUB, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-002234 (1999)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida May 18, 1999 Number: 99-002234 Latest Update: Mar. 08, 2000

The Issue The issues in this case are whether the Department of Environmental Protection (DEP) should modify the conditions of permits held by the Deep Lagoon Boat Club, Ltd., d/b/a Deep Lagoon Marina (Applicant), to allow Applicant to construct and operate a boat travel lift in a new location at the marina and to substitute a 60-foot wide flushing channel required by the prior permits with two-48 inches box culverts.

Findings Of Fact Applicant owns and operates Deep Lagoon Marina (the Marina). The Marina comprises uplands and three canals adjoining MacGregor Boulevard south of downtown Fort Myers. The Marina presently consists of 61 wet slips, 200 dry slips, and other marina-related buildings. The Marina is on Deep Lagoon, a Class III surface water body less than one-half mile from the Caloosahatchee River. Deep Lagoon is a short, largely mangrove- lined waterway that runs north into the Caloosahatchee River. The Caloosahatchee River runs west from Lake Okeechobee past Fort Myers to the Gulf of Mexico. One of Applicant's predecessors in interest dredged the three canals in the 1950s or 1960s, and a marina has existed at this location since that time. As a result of a purchase in 1997, Applicant owns at least the uplands and claims ownership of the submerged bottoms of the canals. The parties have stipulated that ownership of the submerged bottoms of the canals is not being litigated or decided in this proceeding and that, subject to the issue's being decided adverse to the Applicant in other proceedings, sufficient ownership is presumed for purposes of this proceeding. From north to south, the Marina comprises the north canal, which is about 1200 feet long and bounded on the north by a red mangrove fringe 10-20 feet wide; a peninsula; the central canal, which is also known as the central or main basin and is roughly the same length as the north canal; a shorter peninsula; and the south canal, which is about half the length of the central canal and turns to the southeast at a 45-degree angle from the midway point of the central canal. The three canals are dead-end canals, terminating at their eastern ends a short distance from MacGregor Boulevard. Petitioner, Brenda Sheridan, resides at 842 Cal Cove Drive, Fort Myers, Florida, which is on the shores of the Caloosahatchee River at Deep Lagoon, just across the south canal from the Marina. Intervenor, Save the Manatee Club (STMC), is a non- profit Florida corporation with approximately 40,000 members. The organization's stated purpose includes protecting the manatee and its habitat through public awareness efforts, research support and advocacy, which activities benefit manatees, STMC, and its members. The Florida Legislature has recognized STMC's substantial interest in manatee protection by designating it a member of the manatee protection committee provided by the Florida Manatee Sanctuary Act at paragraph 370.12(2)(p), Florida Statutes, and by requiring the state to solicit recommendations from STMC regarding the use of Save the Manatee Trust Fund monies, at Section 370.12(5)(a), Florida Statutes. Numerous members of STMC reside within Lee County, where they observe, study, photograph, and actively attempt to protect manatees from collisions with watercraft. These efforts benefit manatees and provide STMC's members with educational and recreational benefits in the waters of Lee County that would be affected by the proposed activity. STMC has expended substantial resources in advocating increased legal protection of manatees in Lee County, including additional boat speed regulations on the Caloosahatchee River. STMC has also constributed funds for the rescue and rehabilitation of manatees exposed to red tide in Lee County waters. Injury, mortality, and loss of important habitat would produce significant, adverse impacts to the manatee, thereby diminishing the ability of STMC's members to observe, study, and enjoy manatees in waters that would be affected by the proposed activity and frustrating STMC's efforts to preserve and protect manatees in Lee County. Permit History On December 9, 1986,, Applicant's predecessor in title applied to DEP's predecessor agency, the Department of Environmental Regulation (DER), for a dredge and fill permit to rehabilitate the 61 existing wet slips at the Marina and add 113 new wet slips. Because Deep Lagoon violated Class III water quality standards, and there was concern for the West Indian manatee, a listed endangered species which uses the waters in and around Deep Lagoon, DER placed conditions on the permit and gave notice of intent to grant the permit, with conditions, on July 26, 1988. Petitioner and others challenged the issuance of the permit, and formal administrative proceedings were conducted, culminating in a final order on August 24, 1989, approving the permit, with additional conditions, and certifying under the federal Clean Water Act that state water quality standards were met because there would be a net improvement in water quality of the poorly-flushed canals. Sheridan, et al. v. Deep Lagoon Marina and Dept. of Environmental Reg., 11 F.A.L.R. 4710 (DER 1989). Wetland Resource Permit 361279929, incorporating all of the conditions, was issued on September 22, 1989, for construction and operation of the project for five years (the 1989 Permit). Petitioner and the others appealed the final order. In Sheridan v. Deep Lagoon Marina, 576 So. 2d 771, 772 (Fla. 1st DCA 1991), the court, relying on the 1987 water quality data, noted the "very poor water quality" of Deep Lagoon, as reflected in part by the presence of oil and grease 20 times the Class III standard, copper 13 times the standard, lead 20 times the standard, mercury 1000 times the standard, and coliform bacteria "too numerous to count." However, the court affirmed the issuance of the 1989 Permit under the statutory authorization of a permit where ambient water quality does not meet applicable standards, but the activity will provide a net improvement to the waters. On the certification issue, though, the court reversed and remanded. The court held that the hearing officer erroneously excluded evidence on DER's certification of the activity as in compliance the federal Clean Water Act. Following proceedings on remand, DER entered Final Order on Remand on April 10, 1992, which revoked the earlier certification of compliance and, citing 33 United States Code Section 1341, as authority, waived certification as a precondition to federal permitting. Sheridan, et al. v. Deep Lagoon Marina and Dept. of Environmental Reg., 14 F.A.L.R. 2187 (DER 1992). The 1989 Permit expired on September 22, 1994, but Environmental Resource Permit 362504599 was issued on October 9, 1995, essentially extending the 1989 Permit conditions for ten years, to October 9, 2005. Minor modifications were approved on November 17, 1995, March 26, 1997, and April 15, 1997. Environmental Resource Permit 362504599, with all conditions and subsequent modifications, is referred to as the 1995 Permit. Permit Conditions In general, the 1995 Permit authorizes the owner of the Marina: to renovate and expand an existing marina from 61 wet slips to 174 wet slips by: excavating 0.358 ac of uplands to create a flushing canal, installing 375 linear feet of seawall along the sides of the flushing canal, excavating 2.43 ac of submerged bottom to remove contaminated sediments, backfilling 2.41 acres of the dredged area (the main basin and south canal to -7 ft. MLW and the north canal to -6 ft. MLW) with clean sand, renovating the existing 61 slips, and constructing an additional 14,440 square feet of overwater decking for 113 new slips, providing after-the-fact authorization for construction of 2 finger piers, creating a 400 sq. ft. mangrove fringe, constructing 180 linear feet of seawall in the vicinity of the mangrove fringe, and relocating and upgrading fueling facilities. The 1995 Permit authorized activities to proceed in three phases: First, the majority of the water quality improvement measures will be implemented as required in Specific Condition 5. Second, the over water docking structures will be constructed and the fueling facilities will be upgraded and relocated as required in Specific Conditions 6 and 7. Third, the new slips will be occupied in accordance with the phasing plan in Specific Condition 9. Specific Condition 5 imposed several requirements designed "to ensure a net improvement in water quality." Among them, Specific Condition 5 stated in pertinent part: In order to ensure a net improvement to water quality within the basin, the construction of any new docking structures or installation of any new pilings shall not occur until the below-listed conditions (A-K) have been met. . . . A baseline water quality study . . .. A stormwater treatment system providing treatment meeting the specifications of Florida Administrative Code 40E-4 for all discharges into the basins from the project site shall be constructed. . . . The boat wash area shall be re-designed and constructed as shown on Sheets 23 and 23A. All water in the washdown area shall drain into the catch basin of the wastewater treatment system shown on Sheet 23. The water passing through the wastewater treatment system shall drain to the stormwater management system which was previously approved by the South Florida Water Management District. The filters of the wastewater treatment system shall be maintained in functional condition. Material cleaned from the filter shall be disposed of in receptacles maintained specifically for that purpose and taken to a sanitary landfill. This system shall be maintained in functional condition for the life of the facility. Contaminated sediments shall be dredged from the areas shown on Sheets 5 and 7 of 23. A closed-bucket clam shell dredge shall be used. The north canal shall be dredged to at least -9.9 feet MLW and backfilled with clean sand to -6 feet MLW. The [main] basin shall be dredged to at least -7.3 feet MLW and backfilled with clean sand to -7 feet MLW. The south canal shall be dredged to at least -10.5 feet MLW and backfilled with clean sand to at least -7.0 feet MLW. Backfilling shall be completed within 120 days of completion of dredging. . . . The sediments shall be placed directly in sealed trucks, and removed to a self-contained upland disposal site which does not have a point of discharge to waters of the state. A channel, 260 ft. long, 60 ft. wide, with a bottom elevation of -4.5 ft. MLW shall be excavated between the north canal and the main basin to improve flushing. * * * K. Upon completion [of] conditions A-J above, renovation of the existing 61 wet slips and construction of the 113 additional wet slips may proceed with the understanding that construction of all 113 additional slips is at the risk of the permittee and that if the success criteria in the monitoring and occupancy program are not met, removal of all or part of the additional slips may be required by the Department. Specific Condition 8 addressed the phasing of occupancy of the wet slips. Specific Condition 8 provided in pertinent part: Occupancy of the additional 113 wet slips shall occur in two phases, described below. Permanent occupancy of the slips shall require [DEP] approval, contingent upon the water quality monitoring program demonstrating a statistically significant (Specific Condition 9) net improvement for those parameters which did not meet State Water Quality Standards in the baseline study. The permittee agrees that if [DEP] determines that net improvement has not occurred, or if violations of other standards occur, and if the corrective measures described in Specific Condition 10 are not successful, all of the additional slips occupied at that time shall be removed. . . . Phase I--Upon completion of the baseline water quality study and the work specified in Specific Condition No. 5, the existing 61 slips and an additional 56 slips, totalling 117 slips, may be occupied. . . . If at the end of one year of monitoring, the data generated from the water quality monitoring program shows a statistically significant improvement over baseline conditions, for those parameters in violation of State Water Quality Standards, and no violations of additional parameters, . . . the new 56 slips which were occupied shall be considered permanent. Phase II--Upon written notification from [DEP] that Phase I was successful, the remaining 57 additional slips may be occupied. Water and sediment quality monitoring shall continue for two years after the occupancy of 140 of the 174 slips. If a statistically significant net improvement to water quality over baseline conditions for those parameters in violation of State Water Quality Standards [sic] and no violation of additional parameters is shown by the monitoring data, and confirmed by [DEP] in writing, the additional slips shall be considered permanent. Specific Condition 11 added: Implementation of the slip phasing plan described in Specific Condition 8 shall be contingent on compliance of boaters with existing speed zones in the Caloosahatchee River and trends in manatee and [sic] mortality. . . . Approval of additional slips will depend upon manatee mortality trends and boater compliance with speed zones in the Caloosahatchee River and additional slips may not be recommended. . . . Based on the results of the evaluations of Phases I and II, [DEP] may require that slips be removed to adequately protect manatees. Specific Condition 12 required the construction of a 400 square-foot intertidal area for the planting of mangroves to replace the mangroves lost in the construction of the flushing channel. Specific Condition 14 prohibited live-aboards at the marina. Specific Condition 15 added various manatee-protection provisions. Applicant's DOAH Case Nos. 98-3901 and 98-5409 Seeking to satisfy certain of the requirements of Specific Condition 5 of the 1995 Permit, Applicant filed with DEP, on December 10, 1997, an application for an Environmental Resource Permit (ERP) and water quality certification to construct a surface water management system to serve 15.4 acres of its 24-acre marina. On March 3, 1998, Applicant's engineering consultant submitted drawings to DEP with notification that Applicant intended to "maintenance dredge the internal canals of Deep Lagoon Marina," in conformity with Rule 62-312.050(e), Florida Administrative Code. The letter described the proposed dredging as mechanical "with no discharge back into Waters of the State." The letter assured that Applicant's contractor would use turbidity curtains "around the dredging and spoil unloading operation" and advised that the contractor would unload the spoil "to the north peninsula upland area." The letter stated that the dredging would "be to the design depth/existing canal center line depth of -7 NGVD," which was established by the 1995 Permit, and would be "done in conjunction with the required dredging under [1995 Permit] Condition 5(D)." The consultant attached to the March 3 letter several drawings showing the dredging of all three canals. For each canal, the drawings divided the dredging into two areas. (For 1.82 acres, the contractor would dredge contaminated materials from the dead-ends of the three canals and then replace these materials with clean backfill material, as already authorized in the 1995 Permit.) For 4.84 acres, which ran through the remainder of the three canals, the contractor would maintenance dredge in accordance with the cross-sections provided with the letter. By letter dated March 13, 1998, DEP stated its determination that, pursuant to Rule 40E-4.051(2)(a), Florida Administrative Code, the proposed activity was exempt from the requirement to obtain an ERP. The letter warned that, pursuant to Chapter 62-302, Florida Administrative Code, the construction and operation of the project must not cause water quality violations. The letter added that DEP could revoke its determination of exemption if the "basis for the exemption is determined to be materially incorrect, or if the installation results in water quality violations." The letter provided a point of entry for persons whose substantial interests are affected by DEP's determination. Petitioner challenged the exempt status of the maintenance dredging, and STMC intervened in support of the challenge, which was referred to DOAH and given DOAH Case No. 98-3901. But Applicant's contractor proceeded during the pendency of the challenges and completed the maintenance dredging in the three canals. (Applicant's contractor also performed the contaminant dredging and clean backfilling authorized by the 1995 Permit.) On November 5, 1998, DEP gave notice of intent to issue the ERP for the surface water management system and certify compliance with state water quality standards, pursuant to Section 401 of the Clean Water Act, 33 United States Code, Section 1341. Petitioner filed a challenge on December 8, 1998, and the matter was referred to DOAH, where it was given DOAH Case No. 98-5409. On February 6, 1999, DEP revised the notice of intent by withdrawing its certification of state water quality compliance. As it did with the 1989 Permit, DEP again waived state water quality certification, consistent with a letter dated February 2, 1998, in which then-DEP Secretary Virginia Wetherell announced that DEP would waive state water quality certification for all activities in which the agency issues an ERP based on the "net improvement" provisions of Section 373.414(1)(b), Florida Statutes. DOAH Case Nos. 98-3901 and 98-5409 were pending when Applicant sought the modifications to the conditions of the 1995 Permit which are the subject of this case (DOAH Case No. 99- 2234). DOAH Case Nos. 98-3901 and 98-5409 were consolidated and heard by Administrative Law Judge (ALJ) Robert E. Meale on February 11 and May 3-4, 1999. On November 24, 1999, ALJ Meale entered a Recommended Order recommending a final order revoking DEP's determination of an exemption for maintenance dredging in DOAH Case No. 98-3901 and denying the ERP in DOAH Case No. 98- 5409. The recommendation to deny the ERP in DOAH Case No. 98- 5409 was based on findings and conclusions: (1) that Applicant had not provided reasonable assurances that the construction and operation of the proposed surface water management system would result in a "net improvement" in water quality; and (2) that the direct and secondary impacts of the construction and operation of the system would adversely affect the West Indian manatee. Water Quality As indicated in relating the permitting history of this site, water quality in the waters of the Marina has been poor. See Findings 10 and 12, supra. ALJ Meale recently found in his Recommended Order on Case Nos. 98-3901 and 98-5409 as follows: The Caloosahatchee River is laden with sediments, partly due to intermittent discharges from Lake Okeechobee. Seagrass in the riverbottom cannot grow in water much deeper than four feet. Some seagrass grows at the mouth of Deep Lagoon, but little seagrass extends into the lagoon itself. The water quality in the canals is very poor for dissolved oxygen and copper. Applicant stipulated that the water quality in Deep Lagoon violates state standards for dissolved oxygen, copper, and coliform bacteria. In 1997, the canals violated water quality standards for dissolved oxygen nearly each time sampled during the wet season and one-third of the times sampled during the dry season. The dissolved oxygen levels violated even the lower standards for Class IV agricultural waters two-thirds of the times sampled during the wet season. In 1997, the canals violated water quality standards for copper in the water column each time sampled during the wet season and two-thirds of the times sampled during the dry season. During three of the dry season samplings, copper levels were 20 to 30 times lawful limits. The three lowest wet season copper levels were double lawful limits. Copper is a heavy metal that is toxic to a wide range of marine organisms. Copper is applied to boat hulls to prevent marine life from attaching to the hulls. In 1997, the canals violated water quality standards for total coliform bacteria (for any single reading) three of the 60 times sampled during the dry season and one of the 56 times sampled during the wet season. The canals violated the more relaxed, 20-percent standard (which is violated only if 20 percent of the readings exceed it) during the wet season, but not during the dry season. In 1997, the canals violated water quality standards for lead in the water column in one sample (by 25 percent) out of 36, but did not violate water quality standards for oil and grease or fecal coliform bacteria. Results of testing for mercury in the water column (as opposed to sediments) are not contained in the record. As compared to 1987, the water quality in the canals has improved in all but one important respect. In 1987, the water column readings for copper were five to six times higher than the highest 1997 reading. In 1987, the total coliform bacteria were too numerous to count because the colonies had grown together in the sample. However, comparing the April 1987 data with the May 1997 data for the same approximate times of day and the same locations, the dissolved oxygen levels in the three canals have declined dramatically in the last 10 years. Ten years ago, in a one- day sampling period, there were no reported violations; ten years later, in a one-day sampling period, there were four violations. Even worse, the amount of dissolved oxygen in the water during daylight hours has been halved in the last 10 years with a smaller decrease during nighttime hours. In this case, the parties stipulated that the waters of Deep Lagoon and the Marina are Class III marine waters that do not meet Florida water quality standards for dissolved oxygen, copper, and total coliform bacteria. They also stipulated that there were violations in 1987 for oil and greases (20 times standard), fecal coliform (too numerous to count), lead (20 times standard), cadmium (ten times standard), mercury (1,000 times standard), biological diversity, and tributytin (150 times standard) (although DEP and Applicant do not think the 1987 data are relevant). Data collected in 1987 showed average flushing time in the north canal to be 183 hours (tidal prism method), 90.5 hours (current velocity), and 50 hours (dye concentration reduction method). Data collected in 1987 showed average flushing time in the main basin to be 208 hours (tidal prism method), 48 hours (current velocity), and 154 hours (dye concentration reduction method). Manatees The parties stipulated that Lee County is a heavy use area for the West Indian Manatee and that manatees use the water south of Deep Lagoon and the Caloosahatchee River on a year-round basis. ALJ Meale recently found in his Recommended Order on Case Nos. 98-3901 and 98-5409 as follows: The Caloosahatchee River is critical habitat for the endangered West Indian manatee. Up to 500 manatees use the river during the winter. When, during the winter, the water cools, the animals congregate in waters warmed by the thermal discharge from a power plant about 13 miles upstream of Deep Lagoon. When, during the winter, the water warms, the manatees swim downstream, past and into Deep Lagoon searching for food. Manatees frequently visit Deep Lagoon. It is one of the few places between the power plant and the Gulf where manatees can find a quiet place, relatively free of human disturbance, to rest and feed. Within Deep Lagoon, the Iona Drainage District ditch runs parallel to the north canal, separated from the canal by the previously described mangrove fringe. The Iona Drainage District ditch empties into Deep Lagoon just north of the mouth of the north canal. Manatees frequently visit the ditch because it is a seasonal source of freshwater, which the manatees drink. Manatees visit the north canal due to its moderate depths and proximity to the freshwater outfalls of the Iona Drainage District ditch. Manatee mortality from watercraft is extremely high in the immediate vicinity of Deep Lagoon, and the mortality rate has increased in recent years. The rate of manatee deaths from collisions with watercraft has increased with the popularity of motorboating. Boat registrations in Lee County rose from 13,000 in 1974 to 36,000 in 1997. The potential for mitigation offered by the enactment of speed zones has been undermined by the fact that nearly half of the boaters fail to comply with the speed limits. It is clear that manatees frequent Deep Lagoon near the mouth of the north canal. There are seagrass beds there to serve as a food source, and freshwater from the Iona Drainage District ditch discharges in that area. The evidence in this case includes testimony and numerous photographs of manatees not only in that vicinity but up to 200 feet into the north canal. While there are no seagrass beds in the north canal itself, freshwater from the Iona Drainage District ditch discharges into the north canal all along the length of mangrove fringe on the north shore of the canal. It is not clear how much further up the north canal manatees go, but they probably frequently continue further into the north canal since one primary attraction of the north canal for manatees at this time is its relative quiet and peacefulness. Manatees also make some use of the central and south canals of the Marina, but they seem to prefer the north canal for its peacefulness and for the fresh water supply from the Iona Drainage District ditch. The Florida Department of Transportation recently has constructed a retention pond for MacGregor Boulevard in the vicinity of the Marina which will discharge fresh water into the main basin of the central canal. This may make the central canal more attractive to manatees than it is at this time, notwithstanding the relatively high level of boating-related activity there. New Boat Travel Lift The Marina's existing boat travel lift is located in the main basin of the central canal. There also are the remnants of an older travel lift operation at the western end of the central peninsula extending into Deep Lagoon. Applicant proposes to construct and use a new boat travel lift at the eastern terminus of the north canal. The proposed location of the new travel lift will be closer to the approved location of a new service center building. A travel lift essentially consists of a heavy-duty, U-shaped frame which is built on wheels and motorized for mobility. Heavy-duty straps are suspended from the frame using pulley systems. The travel lift is driven out over water on specially-built tracks so the straps can be placed underneath large vessels (over 40 feet) and tightened using the pulleys to secure the vessels; the travel lift is then driven off the tracks, and the vessels are transported to a dry storage or repair location, where the vessels are lowered, and the straps are removed. The process essentially is reversed to return vessels to the water. The direct impact of construction of the new boat travel lift involves removal of some mangroves existing at the terminus of the north canal and sinking pilings to support the tracks extending into the water on which the travel lift operates. Applicant proposes to mitigate the mangrove impacts by filling areas on either side of the proposed travel lift to just above the mean-high waterline and planting the areas with mangroves. Not only will this be a net increase the amount of mangrove fringe, the decrease in water depth at the east end of the north canal also will improve flushing of the canal to some extent. Applicant also proposes to remove exotic plants all along the shoreline of the Marina's canals for the life of the Marina. It is the Marina's intent to use the travel lift only for vessels too large to be lifted by forklifts operated at the main basin of the central canal. The Marina is purchasing new, larger (37,000 pound) forklifts (compared to the 10,000 pound forklifts currently in use), which can lift vessels up to approximately 42 feet long. Use of the larger forklifts will reduce the use of the travel lift. At this time, there is no proposed specific condition to limit use to the travel lift to vessels too large to be lifted by the new forklifts. New Specific Condition 33 in the proposed permit modifications provides: "Launching of vessels from the dry storage facilities shall be prohibited in the north canal at the site." New Specific Condition 34 in the proposed permit modifications provides in part: "Launching and retrieval of vessels in the north canal shall be restricted to vessels stored/moored at the marina facility that require boat repair." New Specific Condition 34 also would require Applicant to maintain logs for the travel lift and boat repairs to allow DEP to verify compliance by comparing the two logs. There was some disagreement as to the intent of the quoted proposed new specific conditions. A DEP witness thought it meant that the Marina only could use the travel lift for repair of vessels permanently moored at the Marina, but the Marina's representative did not think the language would prohibit the repair of other vessels as well. Assuming that vessels not permanently moored at the Marina will be accepted for repairs, and that only vessels too large for the new forklifts will use the new travel lift, it can be anticipated that an average of 6-10 vessels a week will use the travel lift for retrieval from the water and discharge back to the water. To some extent, use of the travel lift is limited by the average time it takes to use the lift. But considering only those limitations, it is possible use the lift as many as 19 times in a day in an emergency--e.g., when a hurricane is approaching, and the Marina is trying to get as many boats out of the water as possible. On average, use of the travel lift also will be limited by market conditions and the capacity of the new service center to store and repair large vessels. More than half of the average use of 6-10 vessels a week probably will occur on Fridays (for repairs before peak weekend boating) and Mondays (for repairs after the weekend peak). At this time, there is no proposed specific condition to limit use of the new travel lift. But at final hearing, the Marina expressed its willingness to accept a limit of an average of ten vessels a week. (Counting retrieval from the water and discharge back to the water for each vessel, the agreed limit would be an average of 20 uses of the travel lift a week). The Marina was not willing to accept a daily limit. Secondary impacts from such a limited use of the proposed new travel lift on water quality and manatees are difficult to assess precisely. The travel lift itself uses some form of lubrication, but only the straps enter the water during operation. Historically, vessels have been pressure-washed and had their bilges and engines flushed while on the existing travel lift in the main basin of the central canal at the Marina, and wash-water from these operations has entered the main basin at that location. Wash-water from such operations at the proposed new travel lift location would enter the north canal, subject to the construction and operation of an adequate surface water management system, as required by Specific Condition 5.C. of the 1995 Permit. Cf. DOAH Case No. 98-5409, supra. It is possible that vessels in need of repair entering the north canal and proceeding to the proposed new travel lift location (whether under power or being towed) could leak oil or gasoline. Both contaminants would rise to the surface. Leaked gasoline and the more volatile components of oil could be expected to evaporate relatively quickly; the residue of oil contamination would be persistent. Such spills would affect water quality and could affect manatees drinking fresher water from the surface of the north canal. There was no evidence from which to predict or quantify such impacts. It would be possible for manatees to be injured by vessels using the proposed new travel lift. Although such vessels would be traveling at low speed (1-2 mile per hour), maneuvering such large vessels in close quarters like the north canal sometimes is accomplished by intermittent bursts of high engine and propeller speeds, both in forward and reverse gears. Such operations could cause a vessel to lurch in the direction of a manatee; if done in reverse gear, a manatee could be sucked into the speeding propellers. It also is possible for a manatee to be crushed against the bottom or against a structure of the Marina facility during such operations. Despite the possibility of injury to manatees from use of the new proposed travel lift, it is clear that most manatee injuries and deaths from boat collisions occur as a result of propeller injuries from boats being operated at high-speed. Manatees are known to frequent and safely use marinas where large vessels operate at low speed. The risk of danger to manatees from use of the proposed new travel lift can be characterized as being minimal if not speculative, especially in view of the manatee protections in Specific Condition 15 of the 1995 Permit. Initially, DEP misunderstood the nature of the proposed new travel lift, thinking it would greatly increase boat traffic in the north canal. When the minor impact of the project was explained, DEP's concerns were allayed. Greater risk of danger to manatees would occur from the addition of wet slips in the north canal, but those impacts are not secondary to the travel lift proposal; they are completely separate impacts that are governed by the pre-existing 1995 Permit. Petitioner and Intervenor were critical of the absence of a specific condition for the daily logs to be presented to DEP for inspection on a regular basis. See Finding 42, supra. They contended that absence of such a requirement would compromise compliance enforcement. But DEP inspection of the logs at times of its own choosing could be just as effective. The key to enforcement is having an enforceable specific condition limiting use of the travel lift. Petitioner and Intervenor also were critical of using a simple weekly average to limit use of the new travel lift. They correctly argue that the time over which the weekly average would be computed must be designated for such a use limitation to be enforceable. They also contend that there should be a daily limit. Assuming a weekly average limitation of ten, a daily limit of ten would not be unreasonable if it allowed leeway to exceed the daily limit in cases of emergencies such as approaching hurricanes. Replacing Flushing Channel with Culverts Applicant's proposal to replace the 60 foot by 4.5 foot-deep flushing channel with two 48-inch culverts is motivated by practical considerations. Applicant essentially wishes to avoid the expense of constructing the channel required under the 1995 Permit and having to bridge the channel to make use of the peninsula between the central and north canals. Part of the Marina's initial motivation for the channel was to expand operations and allow access to the north canal from the main basin. Part of the channel was to have been used by the Marina as a new forklift area with access to boat storage areas on both sides of the channel. In the 1989 Permit, it was stated that the channel was "to act as a sediment sump." It was not until the 1995 Permit that the channel was said to serve to "improve flushing." Most of the "net improvement" of water quality at the Marina was to come from proposed contamination dredging of the canals (and backfilling with clean sand), removal of contaminated soil from Marina uplands, installation of a redesigned boat-wash area, and installation of an adequate surface water management system. Most flushing benefits were anticipated to come from making the canals shallower by back-filling after dredging. Flushing from the channel was presented as "frosting" on the "net improvement cake." The hydrographic evidence was that the channel, in conjunction with back-filling the Marina's canals, would indeed increase flushing of the Marina's canals to some extent. Looking at the main basin only, the channel would improve flushing by up to 27 percent. But looking at the Marina's canals overall, the channel would only increase flushing by up to 0.6 percent. By comparison, the hydrographic evidence was that the proposed flushing culverts also would contribute to increased flushing but by a smaller amount. Looking at the main basin only, the proposed flushing culverts would improve flushing by up to 4 percent. Looking at the Marina's canals overall, the proposed flushing canal would only increase flushing by up to 0.2 percent. Petitioner and Intervenor question the reliability of Applicant's calculations of flushing times without more up-to- date data on the depths of the canals after contamination and maintenance dredging. But the evidence was that differences in the starting depths would not have a significant effect on the relative changes in flushing times from the channel versus the culverts; the differences would be approximately proportional regardless of the starting depths. In addition, the depths assumed in Applicant's calculations are based on the 1987 data and the requirements of the 1995 Permit. Compliance with the requirements of maintenance dredging and the 1995 Permit can be enforced, if necessary, in other proceedings. See, e.g., DOAH Case No. 98-3901, as to maintenance dredging. Applicant's calculations on flushing times do not account for the possibility of an additional benefit from the proposed flushing culverts. Applicant proposes to locate the culvert inverts at a depth of 6 feet. If a greater salinity gradient exists at that depth, the culverts would have a relative advantage over a 4.5 foot-deep channel in terms of flushing and the exchange of more oxygenated water between the north canal and the main basin. The existence of such a salinity gradient is suggested by data collected in 1997. But salinity gradients are not constant, and water samples were collected only during one 24- hour period in May 1997 and another 24-hour period in September 1997. In addition, no data has been collected after the maintenance and contamination dredging. The sampling in this case was too limited to give reasonable assurance that the proposed flushing culverts would have advantages over the required channel in promoting of flushing. Petitioner and Intervenor contend that changing the open channel to closed culverts would decrease the benefit of oxygen exchange in an open-channel system. It is true that, generally, more oxygen would be introduced in an open system. But the evidence was that none of the "net improvement" to water quality from the specific conditions to the 1995 Permit was anticipated to derive from increases in dissolved oxygen from oxygen exchange in the channel. Conversely, Applicant contended that the proposed culverts would decrease the chances of contamination from the uplands, as compared to an open channel. But there was no specific evidence to support or quantify this speculative benefit. In addition, required improvements in surface water management at the Marina would reduce any such benefits from the culverts. See, Specific Condition 5.B. and DOAH Case No. 98-5409. Approximately 60 feet of mangrove fringe would have to be removed from the north canal to accommodate a flushing channel. In contrast, only approximately 8 feet of mangrove fringe would have to be removed to accommodate the proposed culverts. But there was no evidence as to how removing less of the mangrove fringe would improve flushing or water quality. In addition, Specific Condition 12 of the 1995 Permit required replacement of the mangroves lost in the construction of the flushing channel. There was no evidence that installation of flushing culverts instead of the flushing channel required under the 1995 Permit would have any impact on manatees.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order: granting Applicant's proposed modifications to the 1995 Permit, with the following additional modifications: No use of the new travel lift for boats less than 40 foot in length except in emergencies, e.g., approaching hurricane. Limitation on use of travel lift to a 28- day rolling average of ten vessels a week, except in emergencies, e.g., approaching hurricane. Prohibition against pressure-washing and flushing bilges and engines of vessels on the new travel lift except in the boat wash area to be constructed and operated in accordance with Specific Condition 15 of the 1995 Permit. A requirement to report and promptly clean-up any spills of oil or gasoline in the north canal related to operation of the new travel lift. waiving certification as a precondition to federal permitting under 33 United States Code, Section 1341. DONE AND ENTERED this 21st day of January, 2000, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of January, 2000. COPIES FURNISHED: T. Elaine Holmes, Esquire 14502 North Dale Mabry, Suite 200 Tampa, Florida 33618 David Gluckman, Esquire Gluckman and Gluckman 541 Old Magnolia Road Crawfordville, Florida 32327 Matthew D. Uhle, Esquire Humphrey & Knott, P.A. 1625 Hendry Street Fort Myers, Florida 33901 Francine M. Ffolkes Senior Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri Donaldson, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

USC (2) 33 U. S. C. 134133 U.S.C 1341 Florida Laws (12) 120.52120.569120.57120.60120.6826.012267.061373.406373.4136373.414373.421403.031 Florida Administrative Code (14) 40E-4.05140E-4.30140E-4.30262-312.01062-312.03062-312.05062-312.06062-312.07062-312.10062-343.07062-343.10062-4.04062-4.05062-4.080
# 8
SYLVAN ZEMEL, AS TRUSTEE; SHIRLEY KAUFMAN, AS TRUSTEE; NATHAN ZEMEL, AS TRUSTEE; ET AL. vs DEPARTMENT OF MANAGEMENT SERVICES, DIVISION OF BUILDING CONSTRUCTION, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 94-005479 (1994)
Division of Administrative Hearings, Florida Filed:Punta Gorda, Florida Oct. 03, 1994 Number: 94-005479 Latest Update: Jun. 28, 1995

Findings Of Fact The Proposed Permit This case involves a 65-acre site in north Lee County owned by the City of Ft. Myers. At all material times, the land has been zoned under industrial- equivalent designations. By leases that are not part of this record, Ft. Myers has leased 21.4 acres of the 65 acres to various governmental agencies, including Lee County, Lee County Sheriff's Office, and possibly the Florida Department of Juvenile Justice (formerly known as Department of Health and Rehabilitative Services). The following facilities are presently located on the 21.4 acres: Juvenile Detention Center, Lee County Stockade, Price Halfway House, Sheriff's Office Aviation Department, and Emergency Operations Center. By lease dated September 20, 1993, Ft. Myers leased the remaining 43.6 undeveloped acres to Lee County for a term of 50 years. This lease allows Lee County to use the 43.6 acres for $1 per year, but only for the operation of a Juvenile Justice Facility. Under Paragraph 20 of the lease, Ft. Myers may terminate the lease if Lee County ceases to operate the facility. Likewise, Lee County may terminate the lease if the Department of Juvenile Justice ceases to fund the County's operation of the facility. Under the lease, preference is given to juvenile residents of Ft. Myers. Paragraph 22 of the lease allocates liability to Lee County for claims or damages arising from released fuels, including from pipelines. The lease is not assignable without Ft. Myer's consent. By agreement dated December 17, 1993, Ft. Myers consented to the sublease of the entire 43.6- acre parcel to the Department of Juvenile Justice for the purpose of the construction of a juvenile residential commitment facility. Lee County receives no rent from the Department of Juvenile Justice. In Paragraph 10 of the agreement, the Department of Juvenile Justice agrees to maintain, at its expense, "all improvements of every kind . . .." Lee County must make any repairs to improvements if the Department of Juvenile Justice fails to do so. By subsequent agreement, Respondent Department of Management Services (DMS) became the agent for the Department of Juvenile Justice for the design, permitting, and construction of the juvenile justice facility. By Application for a surface water management permit executed June 16, 1994, DMS applied for a surface water management permit for the construction and operation of a 10.9- acre project known as the Lee County Juvenile Commitment Facility. This 10.9-acre project is part of the 43.6 acres leased to Lee County and subleased to the Department of Juvenile Justice. The application states that the existing 21.4 acres of developed sites, which are leased under separate agreements to different governmental entities, "will be permitted as is." The Staff Review Summary of Respondent South Florida Water Management District (SFWMD) describes the purpose of the application as follows: This application is a request for Authorization for Construction and Operation of a surface water management system to serve a 10.9 acre Institutional project discharging to Six Mile [Cypress] Slough via onsite wetlands and road- side swales. The application also requests Authorization for Operation of a surface water management system serving a 21.4 acre existing facility and 32.7 acres to remain unchanged for a total permitted area of 65.0 acres. Staff recommends approval of both authorizations with conditions. The Staff Review Summary accurately states that the owner of the land is Ft. Myers. Of questionable accuracy is the statement that Ft. Myers leases to Lee County the 21.4 acres devoted to the five existing facilities. Although Lee County probably is a lessee of some of these parcels, the Lee County Sheriff's Office is the lessee (or perhaps sublessee) of at least two parcels. One of the other parcels may involve a state agency, again under either a lease or a sublease. The Staff Review Summary inaccurately states that the project developer is Lee County. The project developer is DMS or its principal, the Department of Juvenile Justice. The Staff Review Summary reviews the existing development on the 21.4 acres. The improvements consist of the 4.8-acre Juvenile Detention Center, 2.9- acre Price Halfway House, 4.7-acre Lee County Stockade, 5.1-acre Sheriff's Office Aviation Department, and 3.9-acre Emergency Operations Center. The Staff Review Summary states that the footer of the Juvenile Detention Center was inspected in February 1980. The site drains into a 1.2- acre retention pond, which was a natural pond dug out to accept the drainage from the Juvenile Detention Center. A small amount of surface flow drains from the Juvenile Detention Center to a perimeter swale that drains west into a ditch running along Ortiz Avenue. The Staff Review Summary states that the building permit for the Price Halfway House was issued in October 1982. The site drains into the 1.2-acre retention pond, which was apparently enlarged a second time to accept the additional flow. A small amount of the flow from the Price Halfway House also drains to the perimeter swale and west into the Ortiz Avenue ditch. The Staff Review Summary states that the building permit for the Lee County Stockade was issued on May 25, 1976. SFWMD issued an exemption and a determination that no permit was required for two additions to the stockade in 1988 and 1989. For the additional impervious surface added by these additions, one inch of water quality treatment was provided. After the abandonment of a pumping system, drainage of the stockade site consists of water building up in existing onsite ditches and sheet flowing into the Ortiz Avenue ditch. The Staff Review Summary adds that a small retention area constructed at the southeast corner of the site treats stormwater from the stockade and the Sheriff's Office Aviation Department. The summary adds that a small amount of stormwater drains north into an exterior swale that drains into the Ortiz Avenue ditch. The Staff Review Summary states that a building permit was issued for the Sheriff's Office Aviation Department in August 1977. Stormwater from the site sheetflows to exterior swales north and south of the building. When the swales fill up, the water flows into the Ortiz Avenue ditch. The Staff Review Summary states that a building permit was issued for the Emergency Operations Center on October 11, 1977. Drainage from the center flows directly into the Ortiz Avenue ditch. Under "Water Quality," the Staff Review Summary reports that SFWMD "did not require compliance with discharge rate or criteria" based on Section 1.6, Basis of Review for Surface Water Management Permit Applications within the [SFWMD] March 1994 (Basis of Review), which contains guidelines issued by SFWMD for the construction and operation of surface water management systems. The summary adds that there have been no "water quality or quantity complaints associated with this site over the past 18 years since its initial construction." Noting that a surface water management permit is requested for the entire 65-acre parcel, the Staff Review Summary states that the above-described drainage systems for the five existing facilities are "operational and will remain as they now exist." Turning to the proposed development, the Staff Review Summary states that the remaining 43.6 undeveloped acres "will also be leased to Lee County by the City for the proposed commitment facilities." The facilities are accurately described as a 5.2-acre halfway house and a 5.7-acre bootcamp, both of which will be drained by internal drainage swales and culverts flowing into detention areas, which will discharge through a control structure into onsite wetlands leading to the Ortiz Avenue swale. Addressing designed discharge rates, the Staff Review Summary acknowledges that the bootcamp's discharge rate will exceed the allowable rate for a 25-year, three-day storm event. The allowable rate is .33 cfs, and the design rate is .37 cfs. The Staff Review Summary explains that this discrepancy results from the use of the minimum size orifice (three inches) in the control structure. Addressing water quality, the Staff Review Summary reports that commercially zoned sites are required to provide one-half inch dry pretreatment for water quality unless reasonable assurance can be provided that hazardous material will not enter the surface water management system. Determining that no hazardous material will be stored or generated on the site, SFWMD did not require the one-half inch dry pretreatment of runoff. Noting that no surface water management permits have ever been issued for any part of the 65-acre parcel, the Staff Review Summary recommends that, subject to the customary Limiting Conditions, SFWMD issue: Authorization for Construction and Operation of a 10.9 acre Institutional Project discharging to Six Mile Cypress Slough via onsite wetlands and roadside swales, Operation of a 21.4 acre existing facility and 32.7 acres to remain unchanged for a total permitted area of 65.0 acres. Limiting Condition 4 states that the permittee shall request transfer of the permit to the "responsible operational entity accepted by [SFWMD], if different from the permittee." Limiting Condition 8 adds: A permit transfer to the operation phase shall not occur until a responsible entity meeting the requirements in section 9.0, "Basis of Review . . .," has been established to operate and maintain the system. The entity must be provided with sufficient ownership or legal interest so that it has control over all water management facilities authorized herein. Special Condition 11 states: "Operation of the surface water management system shall be the responsibility of Lee County." The Permittee and the Entity Responsible for Maintenance The proposed permit consists of two authorizations. The first authorization is for the construction and operation of the surface water management system on the 10.9-acre parcel on which will be constructed the bootcamp and halfway house. The second authorization is for the operation of the existing surface water management system on the already-developed 21.4 acres and the unimproved surface water management system on the remaining 32.7 acres. There are two problems with the designation of Lee County as the entity responsible for maintaining the permitted surface water management systems. Basis of Review 9.1.B states: To satisfy [P]ermit [L]imiting [C]ondition [8], the Permittee must supply appropriate written proof, such as either by letter or resolution from the governmental entity that the governmental entity will accept the oper- ation and maintenance of all the surface water management system components . . .. The authorization for operation of the systems on the 21.4-acre and 32.7-acre parcels does not await any construction. Once the permit is issued, the authorization is effective. Therefore, all prerequisites to the designation must have been satisfied before the operation permit issues. For the 21.4-acre parcel, DMS has not provided reasonable assurance that Lee County is the lessee or sublessee of all of the parcels underlying the five existing facilities. In fact, it appears that Lee County is not the lessee or sublessee of all of these parcels. Even if Lee County were the lessee or sublessee of these five parcels, DMS has not provided reasonable assurance that Lee County has assumed responsibility for the maintenance of the surface water management system for the five parcels. Contrary to Basis of Review 9.1.B, there is no written agreement by Lee County to assume operational responsibility, nor is there even an actual agreement to this effect. SFWMD's rules sensibly require that written consent be obtained before the operation permit is issued. Likewise, DMS has failed to show that Lee County has agreed to assume responsibility for the operation and maintenance of the surface water management system for the 32.7-acre parcel. Again, SFWMD must obtain written consent before issuing the permit because no construction will precede operation for the surface water management system on this parcel. Unlike the situation as to the 21.4-acre parcel, the 32.7-acre parcel is leased to Lee County as part of the 43.6- acre parcel. But in the December 17, 1993, agreement, the Department of Juvenile Justice, not Lee County, assumes responsibility for maintaining all improvements, which arguably includes drainage improvements. As between Ft. Myers and Lee County, Lee County assumes secondary liability for the maintenance of all improvements. But the failure of the Department of Juvenile Justice to do so would likely represent a default under the agreement. In such a case, the lease and separate agreement probably would either be in litigation or Lee County would have terminated its obligations under the contracts. In either case, it is unlikely that Lee County would perform its secondary responsibility to maintain the drainage improvements, especially where it is receiving no rent from the Department of Juvenile Justice and priority is given to Ft. Myers juveniles in admission decisions. Construction will precede operation as to the 10.9- acre parcel so the parties have an opportunity, even after the construction and operation permit is issued, to secure the necessary written consent before the operation permit goes into effect. But similar deficiencies exist with respect to the 10.9- acre parcel because the same agreement imposes upon the Department of Juvenile Justice, not Lee County, the obligation to maintain improvements. An additional complication arises as to the 10.9-acre parcel. The Department of Juvenile Justice intends to contract with one or more private entities to operate the bootcamp and halfway house, so there is at least one more party that Lee County could claim was responsible for maintenance of the surface water management system. The question of who is responsible for maintaining the surface water management systems is important. Drainage quantities and directions can change if swales clog up with vegetation or other matter. In this case, one roadside swale in the area of the 21.4-acre parcel is blocked with vegetation. DMS and SFWMD have thus failed to provide reasonable assurance that the designated entity has assumed responsibility for the maintenance and operation of the existing systems or will assume responsibility for the maintenance and operation of the proposed system following its construction. Permit for Existing Development Section 1.6, Basis of Review, states: [SFWMD] issues construction and operation permits for proposed surface water management activities and operation permits for existing systems. The criteria herein are specifically designed to apply to proposed activities (construction and operation permits). Therefore, some of the criteria may not be applicable to the permitting of existing systems (operation permits). For example, in some cases, existing systems may not meet flood protection criteria. Criteria deviation for existing systems will be identified in staff reports. SFWMD has produced no evidence explicating the extent to which existing systems, such as the systems on the 21.4- and 32.7-acre parcels, are entitled to operating permits without meeting some of the criteria applicable to proposed systems, such as the system on the 10.9-acre parcel. There is nothing whatsoever in the record to explain why certain existing systems might not have to meet certain criteria, such as flood protection criteria. Except for the quantity deviation discussed below, there is nothing in the record disclosing the extent to which SFWMD has waived, or even considered the applicability of, certain or all criteria prior to the issuance of operation permits for the existing systems. In practice, SFWMD does not adhere even to the vague standards implied in 1.6. According to the SFWMD witness, the practice of SFWMD, as reflected in this case as to the systems on the 21.4- and 32.7-acre parcels, is to permit existing systems "as is, where is," as long as they have had no reported problems. There are numerous deficiencies in the "as is, where is" unwritten policy, apart from the obvious one that it conflicts with the assurance of 1.6 that only "some of the criteria may not be applicable" to existing systems. First, the record does not define what a "problem" is. Second, the record discloses no means by which reported problems are collected and later accessed, such as by a parcel index. The "as is, where is" policy is an abdication of the limited responsibilities that SFWMD imposes upon itself in 1.6, especially when applied to the present facts. The facts are straightforward. Neither Ft. Myers, Lee County, nor any other party has ever obtained a permit for any surface water management system, despite numerous improvements in the past 20 years requiring such permits, including the construction of a heliport, at which maintenance and refueling of helicopters takes place. In two relatively minor cases, discussed below, SFWMD erroneously determined that no permit was required. In one of those cases, the applicant, Lee County, candidly admitted the existence of a flooding problem. Based on the present record, neither DMS nor SFWMD has justified the issuance of an operation permit for the systems on the 21.4- and 32.7-acre parcels based either on Basis of Review 1.6 or on the "as is, where is" unwritten policy. Construction of the five improvements on the 21.4 acres began between 1975 and December 1977 with construction of a portion of the Lee County Stockade building and parking, Emergency Operations Center building and parking, and a now- removed barn for the Lee County Sheriff's Office. At the same time, a lake was dug, probably for fill purposes. By the end of 1977, about 2.39 acres of the 21.4 acres were converted to impervious surface. From 1978 to March 1980, another 0.96 acres of the 21.4 acres were converted to impervious surface by the construction of a perimeter dike and road. During this period, construction commenced on the Juvenile Detention Center, adding another 1.63 acres of impervious surface. Between March 1980 and December 1981, additions were made to the Lee County Stockade building and the lake for an additional 0.45 acres of impervious area. Between December 1981 and March 1984, the Price Halfway House building and parking were constructed, adding another 0.79 acres of impervious surface. Between March 1984 and February 1986, a heliport facility and landing area were constructed for the Lee County Sheriff's Office, adding another 1.01 acres of impervious surface. Between February 1986 and February 1990, an additional 2.31 acres of impervious surface were added through additions to the Lee County Stockade and parking area, juvenile detention center, and Emergency Operations Center parking area. Between February 1990 and April 1993, another addition to the Lee County Stockade added 0.62 acres of impervious surface. An additional 0.17 acres of lake was excavated. During this time, applicable rules and statutes required permits for the construction of "works" affecting surface water, including ditches, culverts, and other construction that connects to, or draws water from, drains water into, or is placed in or across the waters in the state. The buildings, parking, other impervious surfaces, ditches, swales, dikes, lake excavations, and, at one point, addition of a now- abandoned pump all constituted "works" for which surface water management permits were required. In 1988, Lee County or Ft. Myers applied for an exemption for an addition to the Lee County Stockade. The basis for the claim of exemption was that the parcel consisted of less than 10 acres and the total impervious surface did not exceed two acres. Although rules in effect at the time required consideration of the contiguous 65 acres under common ownership and the total impervious surface for the 9.7-acre "parcel" exceeded two acres, SFWMD erroneously issued an exemption letter. The second instance involving a claim of exemption took place in 1989 when Lee County submitted plans for another addition to the Lee County Stockade, adding 0.51 acres of impervious surface. The submittal acknowledged a "flooding" problem, but promised a master drainage plan for the "entire site." SFWMD determined that no permit would be required due to the promise of a master drainage plan. No master drainage plan was ever prepared. The flooding problem precluded issuance of the operation permit on an "as is, where is" basis for the already-developed 21.4-acre parcel, even assuming that SFWMD adequately justified the use of this unwritten permitting procedure. In fact, SFWMD has not explained adequately its "as is, where is" permitting procedure or even the undelineated permitting criteria referenced in 1.6, Basis of Review. The 65- acre parcel is a poor candidate for preferential permitting of existing systems. The owner and developer constructed the existing systems in near total disregard of the law. The two times that the owner and developer complied with the permitting process involved small additions for which exemptions should not have been granted. In one case, SFWMD exempted the proposed activity due to its error calculating minimum thresholds as to the areas of the parcel and the impervious surface. In the other case, SFWMD exempted the proposed activity partly in reliance on a promised master drainage plan that was not later prepared. To issue operation permits for the existing systems on the 21.4- and 32.7-acre parcels would reward the owner and developer of the 65-acre parcel for noncompliance with the law and provide an incentive for similarly situated landowners and developers likewise to ignore the law. Before issuing operation permits on systems that have received no comprehensive review and that have been added piecemeal over the years, SFWMD must evaluate the surface water systems on the entire 65-acre parcel to determine whether they meet all applicable criteria. The "as is, where is" unwritten policy has no applicability where there have been reports of flooding. If SFWMD chooses to dispense with criteria in reliance upon Basis of Review 1.6, it must be prepared to identify and explain which criteria are waived and why. Water Quality Basis of Review 5.2.2 provides that projects that are zoned commercial or industrial, such as the present one, must provide one-half inch of "dry" detention or retention pretreatment, unless reasonable assurances are provided "that hazardous materials will not enter the project's surface water management system." There is no existing or proposed dry detention on the 65 acres. The existing development includes the Sheriff's Office Aviation Department, which serves as a heliport. The fueling and maintenance of helicopters means that contaminants may enter the stormwater draining off the site. The functioning of the surface water system on this site is therefore of particular importance. There also may be more reason to question the functioning of the surface water system on this site. It is south of the Lee County Stockade, where flooding has been reported. The heliport site has also been the subject of more elaborate drainage improvements, such as the location of a small retention pond near the Stockade boundary and a pump, the latter of which has since been abandoned. The existing system on the 21.4-acre parcel, as well as the existing and proposed systems on the remainder of the 65 acres, require dry pretreatment for reasons apart from the presence of the heliport. The materials likely to be used with the existing and proposed developments are similar to those found on residential sites. SFWMD and DMS contend that there is therefore no need to require dry pretreatment as to these areas. However, the existing and intended institutional uses, such as jails and bootcamps, represent an intensity of use that exceeds the use typical in areas zoned residential. This increased intensity implies the presence of typical residential contaminants, such as petroleum-based products or cleaning solvents, but in greater volumes or concentrations, if not also, in the case of solvents, different compositions. The lease addresses potential liability for released petroleum. In the absence of a showing that such hazardous materials are prevented from entering the runoff, SFWMD must require dry pretreatment for the systems occupying the entire 65-acre parcel. DMS and SFWMD have thus failed to provide reasonable assurance that the existing systems satisfy applicable water quality criteria or that the proposed system will satisfy applicable water quality criteria. Water Quantity The 65-acre parcel adjoins Ortiz Avenue on the west and property owned by Petitioners on the east and south that is undeveloped except for a borrow pit some distance from the 65- acre parcel. The parcel is roughly 1000 feet east- west and 2700 feet north-south. The proposed halfway house is at the north end of the parcel. The halfway house is situated between a proposed detention pond on the west and a recreation field on the east. A paved road divides the halfway house from the rest of the 65- acre parcel. South of the road are the Lee County Stockade on the west, which abuts Ortiz Avenue, and the Juvenile Detention Center on the east. A berm separates these two sites. The berm runs from the road along the west shore of the twice- enlarged 1.2- acre retention pond and the west boundary of the Price Halfway House, which is south of the Juvenile Detention Center. To the west of the berm, south of the Lee County Stockade, is the Sheriff's Office Aviation Department or heliport facility, which abuts Ortiz Avenue. South of the Aviation Department is an outparcel used by the Florida Department of Corrections that also abuts Ortiz Avenue. East of the outparcel is the proposed halfway house with a proposed detention pond west of the halfway house and south of the outparcel. The Emergency Operations Center, which abuts Ortiz Avenue, is south of the detention pond and surrounded on three sides by the 32.7 acres to be left undisturbed at this time. There are perimeter berms around all of the parcels except for the Juvenile Detention Center and Price Halfway House, which are served by a single berm, and the Emergency Operations Center, which appears not to be bermed. The prevailing natural drainage is not pronounced either by direction or volume because the land is nearly level. The natural direction of drainage is to the south and west and remains so on Petitioners' land to the east and south and the undisturbed 32.7 acres to the south. The variety of drainage directions within the remainder of the 65- acre parcel reflects the extent to which berms, swales, ponds, pumps, roads, buildings, parking areas, and other works have been added to the northerly parcels. Runoff reaching the northern boundary of the 65 acres will be diverted due west around the proposed detention pond to the swale running along the east side of Ortiz Avenue. Runoff from the recreation field and halfway house building and parking area drain into the proposed detention pond, which releases water through a gravity control device to the Ortiz Avenue swale. There appears to be a connection routing some runoff from the south side of the recreation field to the Juvenile Detention Center, where it travels west in a roadside swale to the Ortiz Avenue swale. A little less than half of the area of the Juvenile Detention Center site drains into perimeter swales along the north and east borders and then to the west before emptying into the Ortiz Avenue swale. The remainder of the Juvenile Detention Center drains into the retention pond. The same is true of the Price Halfway House. The Lee County Stockade drains to each of its borders where the water then runs west along the north or south border to the Ortiz Avenue swale. The southern half of the Lee County Stockade site drains into the small retention pond at the northwest corner of the Sheriff's Office Aviation Department. Most of the runoff from the heliport facility runs to the southwest corner of the parcel, which is the location of the abandoned pump. From there, the runoff continues to the Ortiz Avenue swale. Very little if any of the runoff from the heliport enters the small retention pond on the northwest corner of the parcel. The bootcamp drains into the detention pond, which then releases water by a gravity control structure into a portion of the undisturbed 32.7-acres before entering the Ortiz Avenue swale. The Emergency Operations Center site drains in all directions away from the building and parking area, eventually draining into the Ortiz Avenue swale. Stormwater discharge rates from the proposed halfway house and bootcamp are 0.28 cfs and 0.37 cfs. Under SFWMD rules, the allowable maximums in the Six Mile Cypress drainage basin are 0.30 cfs and 0.33 cfs, respectively. SFWMD and DMS contend that the excessive discharge from the bootcamp is acceptable because the gravity control device for the proposed detention pond is of the smallest size allowable, given the indisputable need to avoid clogging and ensuing upstream flooding. Initially, SFWMD approved the discharge rates for the halfway house and bootcamp because, when combined, they did not exceed the total allowable value. However, this approach was invalid for two reasons. First, the two sites contain entirely independent drainage systems separated by several hundred feet. Second, after correcting an initial understatement for the value for the halfway house, the actual total exceeds the maximum allowable total. SFWMD contends that the slight excess is acceptable because of the inability to use a smaller orifice in the gravity control structure. However, the discharge quantity easily could have been reduced by design alternatives, such as enlarging the detention pond, which is mostly surrounded by land that is to be left undisturbed. The ease with which the minimum-orifice problem could have been avoided rebuts the presumption contained in Basis of Review 7.2.A that excessive discharge quantities are presumably acceptable if due to the inability to use a smaller orifice. Also, SFWMD and DMS have failed to show that the effect of the excessive discharge quantities is negligible, so the exception in the SFWMD manual for negligible impacts is unavailable. Neither SFWMD nor DMS provided any reasonable assurance as to the quantity of discharge from the 21.4 acres. Rough estimates suggest it is more likely that the quantity of discharge may greatly exceed the allowable maximum. SFWMD must evaluate the water-quantity issues before issuing operation permits for the systems on the 21.4- and 32.7- acre parcels and a construction and operation permit for the 10.9-acre parcel. Obviously, if SFWMD determines that all water quantity criteria are met as to the existing systems, it may issue operation permits for the systems on the 21.4- and 32.7- acre parcels. Otherwise, SFWMD must quantify the extent of the deviation and, if it seeks to waive compliance with any or all quantity standards in reliance on Basis of Review 1.6, evaluate the effect of the waiver and explain the basis for the waiver. DMS and SFWMD have thus failed to provide reasonable assurance that the existing systems satisfy applicable water quantity criteria or that the proposed system will satisfy applicable water quantity criteria. Impacts on Adjacent Lands Petitioners' property is impacted by the above- described drainage in two ways. First, Petitioners' property abutting the east side of Ortiz Avenue, south of the 65 acres, is especially vulnerable to flooding because the Ortiz Avenue swale is not a V-notch, but a half-V. The closed side of the swale prevents the water from running onto Ortiz Avenue. The open side of swale abuts Petitioners' property, so, if the swale's capacity is exceeded, stormwater will be released onto Petitioners' land. Second, perimeter berming along the east side of the 10.9- and 21.4- acre parcels will impede flow off the part of Petitioners' property located to the east of the 65 acres. A swale between the proposed halfway house and the Juvenile Detention Center will receive runoff from a small portion of Petitioners' property to the east and mostly north of the 65 acres. But there is no indication how much runoff from Petitioners' property can be so accommodated, how much runoff is impeded by the existing berm along the east side of the Juvenile Detention Center and Price Halfway House, and how much runoff will be impeded by the addition of new berms along the east side of the proposed halfway house and bootcamp. Basis of Review 6.8 requires that swales and dikes allow the passage of drainage from off-site areas to downstream areas. Rule 40E-4.301(1)(b), Florida Administrative Code, requires that an applicant provide reasonable assurances that a surface water management system will not cause adverse water quality or quantity impacts on adjacent lands. Neither SFWMD nor DMS obtained topographical information for Petitioners' property, as required by the Basis of Review. Rough estimates suggest that the proposed project may require Petitioners' property to retain considerably more stormwater from the design storm event of 25 years, three days. DMS and SFWMD have thus failed to provide reasonable assurance that the proposed system would not have an adverse impact on Petitioners' upstream and downstream land.

Recommendation It is hereby RECOMMENDED that the South Florida Water Management District enter a final order denying the application of the Department of Management Services for all permits for the operation and construction and operation of surface water management systems on the 65-acre parcel. ENTERED on June 19, 1995, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on June 19, 1995. APPENDIX Rulings on Proposed Findings of Petitioners 1-18: adopted or adopted in substance. 19: rejected as subordinate. 20-21: adopted or adopted in substance. 22-24 (first sentence): rejected as irrelevant. 24 (remainder)-46: adopted or adopted in substance. 47-53: rejected as subordinate. 54-64 (first sentence): adopted or adopted in substance. 64 (second sentence)-66: rejected as subordinate. Rulings on Proposed Findings of Respondent SFWMD 1-10: adopted or adopted in substance. 11: rejected as unsupported by the appropriate weight of the evidence. 12: rejected as unnecessary. 13: adopted or adopted in substance. 14-15: rejected as subordinate. 16: rejected as unsupported by the appropriate weight of the evidence. 17 (except for last sentence): adopted or adopted in substance. 17 (last sentence): rejected as unsupported by the appropriate weight of the evidence. 18-32 (first sentence): rejected as unnecessary. 32 (remainder): rejected as unsupported by the appropriate weight of the evidence. 33: rejected as subordinate. 34: rejected as unsupported by the appropriate weight of the evidence, except that the proposed ponds are wet detention. 35 (first sentence): adopted or adopted in substance. 35 (remainder): rejected as unsupported by the appropriate weight of the evidence. 36-45: rejected as unnecessary. 46-47: rejected as unsupported by the appropriate weight of the evidence. 48-50 (second sentence): adopted or adopted in substance. 50 (remainder): rejected as unsupported by the appropriate weight of the evidence. 51-52, 55-57 (first sentence), and 58: adopted or adopted in substance, although insufficient water quality treatment. 53: adopted or adopted in substance. 54: rejected as unsupported by the appropriate weight of the evidence. 57 (second sentence): rejected as unsupported by the appropriate weight of the evidence. 59: rejected as unsupported by the appropriate weight of the evidence. 60: adopted or adopted in substance, except after "therefore." None of remainder logically follows from what is said in 1.6. 61: rejected as unsupported by the appropriate weight of the evidence. 62-64: rejected as subordinate, unsupported by the appropriate weight of the evidence, and irrelevant. 65: rejected as subordinate. 66: rejected as irrelevant. The burden is on the applicant and SFWMD, if it wishes to issue the permits, to provide reasonable assurances as to the adverse impact of the drainage systems. 67-68: rejected as subordinate. 69: rejected as unsupported by the appropriate weight of the evidence. 70: rejected as unsupported by the appropriate weight of the evidence. 71: rejected as repetitious. 72: rejected as irrelevant, except for past report of flooding, which is rejected as repetitious. 73: rejected as repetitious. 74: rejected as irrelevant and subordinate. 75 (first three sentences): adopted or adopted in substance. 75 (remainder): rejected as unsupported by the appropriate weight of the evidence. 1 and 2: rejected as irrelevant insofar as the same result is reached with or without the permit modifications. Rulings on Proposed Findings of Respondent DMS 1-4: adopted or adopted in substance. 5: rejected as subordinate. 6: rejected as unsupported by the appropriate weight of the evidence. 7: adopted or adopted in substance. 8: rejected as subordinate. 9: adopted or adopted in substance, except that the excessive discharge was not "caused" by the minimum-sized orifice, only defended on that basis. 10: adopted or adopted in substance. 11-12: rejected as subordinate. 13: rejected as irrelevant. 14: adopted or adopted in substance. 15: adopted or adopted in substance, except for implication that no flooding problems existed. 16: rejected as recitation of evidence. 17: rejected as subordinate. 18: rejected as irrelevant. 19: adopted or adopted in substance, to the extent that separateness of systems is relevant. 20: rejected as subordinate. 21: adopted or adopted in substance, except for last sentence, which is rejected as unsupported by the appropriate weight of the evidence. 22: rejected as subordinate. 23-30: rejected as unsupported by the appropriate weight of the evidence, recitation of evidence, and subordinate. 31: rejected as unsupported by the appropriate weight of the evidence. 32: rejected as unsupported by the appropriate weight of the evidence, based on the present record. 33: rejected as unsupported by the appropriate weight of the evidence and relevance. COPIES FURNISHED: Tilford C. Creel Executive Director South Florida Water Management District P. O. Box 24680 West Palm Beach, FL 33416 Russell P. Schropp Harold N. Hume, Jr. Henderson Franklin P.O. Box 280 Ft. Myers, Fl 33902 O. Earl Black, Jr. Stephen S. Mathues Department of Management Services 4050 Esplanade Way, Suite 260 Tallahassee, FL 32399-0950 Vincent J. Chen Toni M. Leidy South Florida Water Management District 3301 Gun Club Road West Palm Beach, FL 33401

Florida Laws (3) 1.01120.57373.413 Florida Administrative Code (2) 40E-4.09140E-4.301
# 9
SAVE THE MANATEE CLUB, INC., AND FRIENDS OF THE GREENWAY vs CITRUS RECREATIONAL MARINA, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-001723 (1996)
Division of Administrative Hearings, Florida Filed:Floral City, Florida Apr. 09, 1996 Number: 96-001723 Latest Update: Feb. 10, 1997

Findings Of Fact The Parties. Respondent, Citrus Recreational Marina, Inc. (hereinafter referred to as "Marina"), is a corporation. Marina is the applicant for the permit which is at issue in this proceeding. Respondent, the Florida Department of Environmental Protection (hereinafter referred to as the "Department"), is an agency of the State of Florida with the responsibility for, among other things, wetland resource permitting. The Department also has responsibility, pursuant to an agreement with the Southwest Florida Water Management District (hereinafter referred to as the "Water Management District"), for Management and Storage of Surface Water permitting within the jurisdictional boundaries of the Water Management District. Petitioner, Save the Manatee Club, Inc. (hereinafter referred to as "Save the Manatee"), is a non-profit, Florida corporation. The stated purpose of Save the Manatee includes protection of the manatee and its habitat through the promotion of public awareness, research and lobbying efforts. Petitioner, Friends of the Greenway (hereinafter referred to as "Friends"), is an organization which promotes responsible environmental policy in Citrus County. Save the Manatee and Friends are "citizens" of the State of Florida. They filed a verified petition for hearing in this matter. They alleged in the petition that the proposed facility will injure, harm, or otherwise pollute the state's natural resources. Members of Petitioners observe, study and enjoy manatee in Citrus County, including waters that would be impacted by the proposed facility. Marina's Permit Applications, the Department's Notice of Intent to Issue and the Petitioners' Challenge. On March 28, 1995, Marina applied to the Department for a permit for Management and Storage of Surface Water. On March 10, 1993, Marina applied to the Department for a wetland resources (dredge and fill) permit. The permits sought by Marina are associated with Marina's plan to construct a marina facility. The marina is to be constructed within an existing dolomite mine pit (hereinafter referred to as the "Mine Pit"). On or about February 6, 1996, the Department entered a notice of intent to issue the permit sought by Marina. A copy of the draft permit, permit number 092278259 and MS092681199, was attached to the notice of intent to issue. On or about March 13, 1996, Petitioners filed a Petition for Formal Administrative Hearing challenging the Department's proposed decision to issue the draft permit. Marina's Proposed Facility. Marina's proposed facility is to be located in Citrus County, Florida. Citrus County is located on the west coast of Florida, north of Tampa, Florida, and south of the mouth of the Suwannee River on the Gulf of Mexico. As part of the proposed facility, Marina proposed to construct 256 wet slips (122 of which may be covered) on six floating docks, a boat ramp, a boat lift bay, a 63-boat dry storage facility, a convenience store with fueling and sewage pump-out facilities, a clubhouse, a stormwater facility and a parking area. The proposed facilities will also include a potable water system. The water system will provide drinking water to the clubhouse, bait stand, fueling facility, boat storage area and the marina docks. The proposed facilities will also include an on-site wastewater treatment facility. The treatment facility will consists of an aerobic system with on-site effluent disposal through drainfield lines into the soil. No sewage treatment percolation ponds will be included on the proposed site. The stormwater system for the proposed site will be separate from the wastewater treatment facility. The stormwater system will include the collection and treatment of stormwater in on-site basins prior to discharge into the Mine Pit. The system will be designed to retain the entire rainfall from a 100-year storm combined with wet detention and on-line systems involving percolation. All these systems have been designed to meet the design standards required by Chapter 40D-4, Florida Administrative Code. The post development runoff discharge rate for the proposed site is projected to be less than the current rate of runoff discharge on the proposed site. The proposed facility will not cause any increased flood risks on-site or off-site. No part of the surface water management system will be located within 100 feet of any public supply well. The fish cleaning stations included for the proposed facility will be located over land. Waste associated with fish cleaning will be collected for disposal. Wastewater from the stations will be directed into the wastewater treatment system for the proposed facility. Wastewater from boats at the proposed facility will directed to the wastewater treatment facility through two pumpout stations located near the proposed fueling facility. Solid waste from the proposed facility and boats utilizing it will be disposed of in trash receptacles located throughout the proposed site. They will ultimately be picked up by a solid waste hauler for disposal. Erosion around the Mine Pit will be controlled through the placement of 2,200 feet of rip rap, vegetation planting and other erosion control techniques. The Mine Pit where the proposed marina is to be constructed is located on the south side of the Cross Florida Greenway Waterway (hereinafter referred to as the "Greenway Waterway") (formerly known as the "Cross Florida Barge Canal"), approximately one half mile east of where U.S. Highway 19 crosses the Greenway Waterway. The proposed site is approximately 4.75 miles from where the Greenway Waterway empties into the Gulf of Mexico. The Mine Pit is U-shaped, approximately 31.4 acres in size, and has an average depth of -20 feet, with pockets of -33 feet in depth. Marina proposed to fill the Mine Pit to 13.0 feet NGVD, place 2,285 linear feet of rip rap, and dredge 4.75 acres of the Mine Pit to -13.0 feet NGVD. The waters of the northwestern corner of the Mine Pit are separated from the waters of the Greenway Waterway by a plug of land approximately 100 to 150 feet wide. Marina proposed to remove the plug to create an entrance from the marina to the Greenway Waterway. The removal of the plug will result in a lowering of the level of water in the Mine Pit by approximately 3 to 5 feet to sea level, the level of the water in the Greenway Waterway. Marina also proposed to excavate a flushing canal channel between the Greenway Waterway and the northeast corner of the Mine Pit. The boundary of the property on which the Mine Pit is located is approximately 100 feet from the Mine Pit at its closest location. The Mine Pit was excavated from lime rock and Ona fine sands; Pits and Udorthents (both manmade) soil types exist throughout the project site. Weedy vegetation dominates the historically disturbed upland area surrounding the Mine Pit. Saltbush (Baccharis halimfolia), marsh elder (Iva frutescens), dog fennel (Eupatorium spp.), marsh fleabane (Pluches spp.), and waxmyrtle (Myrica cerifera) exist along the Greenway Waterway. Southern red cedars (Juniperius silcicola) are scattered throughout the area. Cattails (Typha spp.) have invaded the edges of the Mine Pit. Ownership of the Proposed Site Property. Marina has no ownership interest in the property where the Mine Pit is located. Nor has Marina ever held such an interest. The proposed facility site is held in three undivided interests. At the time the permit applications were filed by Marina, Marina had an option contract to purchase the proposed site. At the time of the final hearing of this matter, the option contract was no longer in force. Marina had also been authorized in writing prior to filing the permit applications to act as agent for the owners of the site for purposes of seeking environmental permitting. It was stipulated at the time of the final hearing that two of the three undivided interest owners had authorized Marina to act as their agent for purposes of obtaining the permits at issue in this proceeding. At the time of the final hearing, the third undivided interest owner did not authorize Marina to act as its agent for any purpose. Marina is agreeable to a new condition being added to the draft permit by the Department requiring Marina to submit documentation to the Department before any development of the proposed facility is commenced proving that Marina has acquired interests in the proposed site necessary for it to carry out the permit conditions. It is the Water Management District's policy in implementing Rule 40D- 4.301(g), Florida Administrative Code, which requires applicants to provide reasonable assurances concerning their proposed projects, is to require the land owner to be the permittee. The Greenway Waterway and the Surrounding Area. The Greenway Waterway consists of natural and man-made waters formerly intended to be used as the Cross Florida Barge Canal. The waters of the Greenway Waterway are classified as "Class III" waters. The Cross Florida Barge Canal was deauthorized on January 22, 1991. In its place was created the Cross Florida Greenways State Recreation and Conservation Area. The State of Florida owns the majority of the lands within the Cross Florida Greenways State Recreation and Conservation Area. The state can, therefore, control development along the Greenway Waterway. A portion of the Greenway Waterway was constructed as part of the Cross Florida Barge Canal by digging a canal from a spillway at Lake Rousseau, east-northeast of the proposed site, to the Gulf of Mexico. This portion of the canal (hereinafter referred to as the "Greenway Canal"), is straight and was designed for a depth of 12 feet. The actual depth of the Greenway Canal varies and, in some locations, is 18 feet deep. The Greenway Canal is also approximately 250 feet wide. The Greenway Canal intersects the Withlacoochee River, which is located to the east of the proposed facility. Prior to the construction of the Greenway Canal, the Withlacoochee River ran from a spillway at Lake Rousseau to the Gulf of Mexico. After construction of the Greenway Canal, the portion of the Withlacoochee River which connects with the Gulf of Mexico was, and still is, separated from the Greenway Canal by an earthen berm. The western portion of the Withlacoochee River (hereinafter referred to as the "Upper Withlacoochee"), continues to run from Lake Rousseau for approximately 1.3 miles to the Greenway Canal and then runs to the Gulf of Mexico through the Greenway Canal. The depth of the Upper Withlacoochee varies from river bottom which is exposed at low tide to areas of approximately 20 feet. The depth of water, the speed at which water flows and the amount of aquatic vegetation in the Upper Withlacoochee varies depending on the amount of water released from Lake Rousseau through the spillway. For the past year, the rate of flow in the Upper Withlacoochee has been relatively high. There are currently two public boat ramps, but no marinas, located on the Greenway Canal. One of those boat ramps is in disrepair and the evidence failed to prove that it is in use. There are no marinas on the Upper Withlacoochee or the Greenway Canal. There is a Florida Marine Patrol station located on the Greenway Canal approximately one-half mile east of U.S. Highway 19. Whether the presence of the station will have any impact on the enforcement of speed limits in the Greenway Canal is purely speculative. Approximately 2 miles west of the proposed facility is an existing active mining operation owned by Independent Aggregates. Barges transport mine product along the Greenway Canal from the mine to the Gulf of Mexico. Another organization, known as "Holnam", has been permitted by the Department to construct a barge-loading facility opposite the Independent Aggregates' barge facility and mine. It is unlikely, however, that Holnam will actually begin operating barges on the Greenway Canal. A speed limit of 25 miles per hour has been imposed by the Department throughout the Greenway Canal. The speed limit was imposed to protect West India Manatee that utilize the Greenway Canal. The Upper Withlacoochee has been designated an idle-speed zone by local ordinance. Crab traps are located along the banks of the Greenway Canal for approximately four miles into the Greenway Canal from the Gulf of Mexico. Traps are generally anchored to the bottom by lines and are spaced approximately 100 feet apart, 20 to 15 feet from the bank. A channel extends for approximately 12 to 15 miles into the Gulf of Mexico from the mouth of the Greenway Canal. The channel is marked. There are obstructions and shallow water outside this channel. Prudent boaters will continue in the channel for approximately four to nine miles before turning north or south into the Gulf of Mexico. Operators of smaller boats and those with knowledge of the area are able, however, to navigate north or south closer to shore. Impact on the Conservation of Fish and Wildlife, Including Endangered or Threatened Species, or Their Habitat. The West India Manatee is an endangered species, which means that it is in danger of extinction. Approximately 3000 manatees are found in Florida waters. Approximately half are located on the east coast and half on the west coast of Florida. There is little interchange between the two groups. The State of Florida is attempting to restore the manatee population to a size which will help to insure its survival as a species. In order for the manatee population to survive, human development and interaction with manatees must be managed. Manatee habitat needs to be preserved from development. Two of the most significant challenges to the survival of the manatee are the number of manatees killed by boats and the increasing number of boats in Florida waters. Collisions with boats is the greatest known cause of manatee deaths (approximately 25 percent). Manatee change locations frequently searching for food, drinking water, resting areas, potential mates and birthing areas. They also return to preferred habitat features. Manatee are attracted to areas that are calm and quiet for birthing areas. Shallow water, accessible from deeper water, is essential for birthing. After giving birth, the mother and calf generally remain in the area for some period of time, sometimes as long as months, until the calf is able to survive elsewhere. They will leave an area, however, if disturbed. Boat traffic, even at slow speeds, can cause disruption to mothers and young calves. Boat traffic can separate a mother and calf. There are approximately 300 manatee in the waters of northwestern Florida (from Tampa Bay to the Suwannee River), which includes the area of the proposed facility and Citrus County. This population has been increasing in recent years. Manatee in the waters of northwestern Florida require a stable source of warm water during the winter. During the winter ambient temperatures drop below the level at which the manatees' metabolism will sustain them. As a result of the need for warmer waters, most of the manatee in northwestern Florida spend the winter in Citrus County. Kings Bay, Crystal River and Homosassa all provide warm water locations for manatee. These sites are located to the south of the proposed facility. Kings Bay is the most important winter manatee habitat on the west coast of Florida. During the rest of the year, when waters are warmer, manatee leave their warm water, winter habitats to forage and investigate other habitat. Manatee that winter in the warm water sites in Citrus County generally migrate to the north. They travel to, and past, the mouth of the Greenway Canal, returning by the same general routes in the winter. Manatee also linger at the mouth of the Greenway Canal at the Gulf of Mexico because that area offers a combination of a relatively deep-water channel with adjacent shallow water and aquatic vegetation. Manatee use the waters of the Greenway Canal and the Upper Withlacoochee. The Greenway Canal is not, however, considered particularly good habitat for manatee. It has relatively deep water, steep banks, little fresh water and little vegetation of interest to manatee. In 1991 Citrus County adopted a Manatee Protection Plan as part of its comprehensive growth management plan. The Manatee Protection Plan does not identify the Greenway Canal as essential manatee habitat. The Manatee Protection Plan was adopted with the assistance of the Department. The Plan was based upon a compilation of manatee studies, marina inventory studies, and a comprehensive view of the county's waterway systems at the time the Plan was adopted. "Essential manatee habitat" is defined in the Manatee Protection Plan as "any land or water area constituting elements necessary to the survival and recovery of the manatee population from endangered status". Whether an area is "essential manatee habitat" is to be considered under the Plan as "a criteria for determining areas where dock facilities should be limited." The definition of "essential manatee habitat" for purposes of the Plan is different from the standard to be applied in by the Department in this case. The definition in the Plan is similar to the federal criteria considered and found to be different from that applicable to Department permitting cases in Metropolitan Dade County v. Coscan Florida, Inc., 609 So.2d 644, 651 (Fla. 3d DCA 1992). The Manatee Protection Plan contemplates that a master plan will be undertaken to establish the capacity of the Greenway Canal for boat and marina facilities. That master plan has not been developed. The fact that the master plan has not been formally undertaken, however, is of little consequence. The Department, due to the State's ownership of the land surrounding the Greenway Canal, has been able to consider possible uses of the Greenway Canal for boating and marinas without a formal master plan. The Manatee Protection Plan does not support a finding that the proposed facility will not have an adverse impact on the manatee. Although the waters of the Greenway Canal do not constitute good manatee habitat, the Upper Withlacoochee is considered good habitat, depending on the amount of water being released from the spillway at Lake Rousseau. Manatee have used the Upper Withlacoochee for feeding, resting and birthing. The Upper Withlacoochee has limited human activity, light boat traffic, sources of fresh water, a warm-water spring and aquatic vegetation. The Upper Withlacoochee has been used for birthing. Infant mortalities reported in the area suggest that the Upper Withlacoochee is used as a preferred birthing area. The rate of mortality suggests a higher rate of successful births. Aerial survey and mortality data also suggests that the Upper Withlacoochee and the Greenway Canal are utilized throughout the year by manatee. Greatest use is seasonal. Aerial survey data underestimates the number of manatee utilizing the Upper Withlacoochee and the Greenway Canal due to the lack of water clarity and due to the meandering course of, and vegetation along, the Upper Withlacoochee. Manatee mortality data concerning the Greenway Canal and the Upper Withlachoochee provides some indication of the fact that the number of manatee that travel through the Greenway Canal and the Upper Withlacoochee is not insignificant. While there was considerable evidence presented concerning whether the number of manatee that utilize the Greenway Canal and the Upper Withlacoochee is accurate or has been underestimated, based upon aerial survey data and manatee mortality comparisons, the critical fact proved by the evidence in this case is that a significant number of manatee do use the Upper Withlacoochee as habitat, including for birthing. The evidence also proved that, in order for manatee to use the Upper Withlacoochee, it is necessary that they travel the length of the Greenway Canal. Another critical fact proved by the evidence is to this matter is that manatee traveling to and from the Upper Withlacoochee must travel the Greenway Canal from the Gulf of Mexico past the proposed facility. The evidence was also unrefuted that increased boat traffic from the proposed facility will have the potential to adversely impact the manatee. That adverse impact will take the form of physical injury due to collisions and stress on manatee from increased human activity. The activity could reduce the use of the Upper Withlacoochee as habitat. What remains to be determined is whether the conditions of the draft permit will provide adequate assurances that the impact will not be contrary to the public interest. The Department's Bureau of Protected Species Management determined that, without the conditions to be added to the draft permit it suggested, the following impacts could be expected as a result of approval of the proposed facility: The probability of manatee/boat collisions increases with increasing boat traffic where boaters and manatees regularly inhabit the same waterways. While the current level of barge/vessel traffic does not appear to be a problem, increasing the amount of recrea- tional and commercial vessel traffic to the proposed levels in this narrow waterway is expected to adversely impact the endangered manatee. Barge trips may become more frequent, and barges traveling down the center of the canal drives manatees toward the edges of the canal. This increases the risk of manatee/recreational boat collisions, and increases the risk of these recreational boats driving manatees underneath, ahead of or behind traveling barges. The probability of lethal and sublethal propeller strikes increases. Also, there is not sufficient space for manatees between the canal bottom and the bottom of a fully loaded barge, with only one foot clearance as typical for loaded barges. The probability of a manatee being crushed will increase, and this impact is difficult to offset with conservation measures other than not allowing the activity. Page 2, Petitioners exhibit 7 and CRMI exhibit 10. The evidence in this case supports the foregoing conclusions. The increased boat traffic from the proposed facility, even if limited to sailboats and even if power boats are allowed at lower speed limits than currently in force in the Greenway Canal, may cause impacts with manatees due to the increased traffic and the use of the Greenway Canal by barges and recreational boats. It is possible that manatees, confronted by oncoming recreational boats and barges, may be forced into the path of barges and be crushed. Barges used by Independent Aggregates are approximately 72 feet wide and 250 feet long and are pulled or pushed by tugboats. The probability of this conflict taking place will be greater if barge use of the Greenway Canal is increased as proposed by Independent Aggregates. The greatest threat to the manatee of the proposed facility is the threat of death or injury as a result of cuts or blunt trauma from collisions of boats with manatees. This threat is primarily associated, however, with faster moving, power boats. Therefore, the extent of possible adverse impact on the manatee will be determined largely by the speed limit imposed in the Greenway Canal. To mitigate against the possible adverse impact on manatee, the Department has included certain conditions in the draft permit. Those conditions are found in Condition 6 of the draft permit and were recommended by the Department's Bureau of Protected Species Management. As a result of the Bureau of Protected Species Management's review of the proposed facility, it was recommended that the proposed facility not be approved if all of the conditions suggested by it were not included in the draft permit. All of the conditions recommended, except one, were included in the draft permit. The condition not included was one that provided that a violation of manatee speed zones would be grounds for revocation of the lease of any slip or dock space at the proposed facility. The lease revocation condition recommended by the Bureau of Protected Species Management was not included in the permit due to concern by the Department as to whether the condition could be legally imposed. The language of the memorandum of review of the proposed facility from the Bureau of Protected Species Management suggesting that the proposed project should not be approved unless all recommended conditions are accepted is standard language used by the Bureau and not intended to be strictly interpreted. The Bureau ultimately concluded that, despite its recommendation, it believes that the conditions of the draft permit are adequate to offset adverse impacts to the manatee. The Bureau's explanation is sufficient to eliminate any inference that otherwise may be drawn from its suggestion that the proposed facility should not be approved due to the exclusion of the permit condition concerning revocation of leases for speed zone violators. Condition 6 requires, among other things, that signs warning of possible manatee activity be displayed during construction, that personnel associated with the project be educated about the manatee, and that other measures designed to protect manatee during construction be followed. Due to the fact that most of the construction will take place in the enclosed Mine Pit, there should be little, if any adverse impact on manatee as as result of construction. Condition 6 also provides that permanent manatee warning signs and information concerning manatee be posted by the marina, and that a manatee awareness education program be established at the proposed facility. Condition 6 also limits the use of the boat ramp of the proposed facility to boats stored "on-site." The ramp will not be open to the general public. Finally, condition 6.l. provides the most important limitation of the use of the proposed facility. Condition 6.1 limits use of the proposed facility to sailboats and, therefore, prohibits the use of power boats: . . . until the applicant has provided documentation to the Department that manatee protection speed zones in the CFBC have been revised, approved by the Bureau of Protected Species Management, and posted in the CFBC. Occupancy of the facility by sailboats shall not be restricted. The limitation of the use of a marina to sailboats should adequately mitigate the adverse impacts to the manatee from the proposed facility. See Coscan, at 651. The effect of condition 6.l. is to allow Marina to obtain a modification of the draft permit after it is issued to allow power boats based upon events which may take place in the future. There are no guarantees that those events will result in reasonable assurances that the adverse impact to the manatee from power boat use at the proposed facility will not be contrary to the public interest. The speed zones which must be established and approved by the Bureau of Protected Species Management will be established, if at all, through rule- making procedures. See Rule 62N-22.011, Florida Administrative Code. The process would allow public input. Additionally, the outcome of the process would be subject to challenge under Chapter 120, Florida Statutes. Because of possible challenges to the efforts to impose speed zones, it is possible that speed zones adequate to reduce the adverse impacts to the manatee which would satisfy the public interest test applicable in this matter will not be adopted. The standards which the Department must adhere to in establishing speed zones are not the same standards applicable in this matter. In this matter, reasonable assurances must be given that there will not be adverse impacts to the manatee, a threatened species, contrary to the public interest. Establishing speed zones pursuant to other provisions of law will not insure that the reasonable assurances required for the issuance of the permit at issue in this case will be given. Although the resulting speed zones may be adequate to protect the manatee, there is no way to determine what kind of speed zones will be established. Without knowing the ultimate speed zones which may be established, or, more importantly, to know that the speed zones will meet the public interest test applicable in this matter, it is not possible to find the reasonable assurances Marina is required to provide at this time or at any time before the proposed facility is actually permitted. If reasonable assurances can be given that the use of power boats in the proposed facility will not be contrary to the public interest once speed zones are established, Marina or the owner of the proposed facility may apply for a permit modification. At that time the requisite reasonable assurances concerning power boat use can be determined. The provision of condition 6.l. allowing Marina to avoid seeking a permit modification at that time is, therefore, at a minimum, unnecessary, and at its worse, an effort to allow Marina to avoid having to provide the necessary reasonable assurances concerning the use of power boats. If only the impact on the manatee were considered in establishing speed zones, it could be concluded slow or idle speed should be imposed throughout the Greenway Canal and for some distance into the Gulf of Mexico in order to adequately reduce the adverse impact from the proposed facility on the manatee. Establishing speed zones, however, requires a consideration of other factors. The evidence in this case failed to address those factors sufficiently to recommend a condition to the draft permit concerning speed zones. Based upon the foregoing, it is concluded that reasonable assurances have not been given that there will not be unreasonable adverse impact to the manatee if the use of power boats at the proposed facility is allowed as provided in condition 6.l. of the draft permit. Other Public Interest Criteria. The evidence failed to prove that the proposed facility will adversely affect the public health, safety or welfare or the property of others. The evidence also failed to prove that the proposed facility will adversely affect navigation or the flow of water or cause harmful erosion or shoaling. The docks and other marina facilities will all be restricted to the Mine Pit, which is not now open to navigation. There is adequate width in the Greenway Canal to allow boats to exit the Mine Pit into the Greenway Canal and for boats and barges in the Greenway Canal to pass each other. Rip-rap to be placed along the Mine Pit shore and other shoreline stabilization activities will be adequate to prevent erosion and shoaling. Groundwater flow at the proposed site should not be adversely affected by the proposed facility, except as discussed, infra. The proposed facility should not adversely affect fishing or recreational values or marine productivity in the vicinity of the proposed facility. Recreational values (boating and fishing) should be enhanced as a result of the proposed facility. If condition 6.l. is not eliminated and power boats are allowed in the Greenway Canal, there are no assurances that the recreational value provided by the manatee will not be adversely impacted. The proposed facility is intended to be permanent. The evidence failed to prove that the proposed facility will adversely affect or enhance significant historical or archaeological resources under the provisions of Section 267.061, Florida Statutes. If condition 6.l. is not modified to eliminate the use of power boats automatically upon the establishment of speed zones, there are no reasonable assurances that the current condition and relative value of functions being performed by the Greenway Canal and the Upper Withlacoochee will not be adversely affected by the proposed facility. Otherwise, the proposed facility should not have an adverse impact on current conditions and relative value of current functions of the area. Groundwater Quality Standards. The general geology in the area of the proposed facility and the Greenway Canal is known as karst terrain. Karst terrain is geology formed by the solution of limestone over millions of years. Sequential episodes of exposure of the Floridan aquifer, which underlies the area, occurs in karst terrain as the result of the natural formation of sink holes. These sink holes impact the movement of groundwater. Information exists to reasonably describe the hydrogeology of the area in "regional" terms. There is insufficient information generally available about the specific hydrogeology of the proposed site or the immediately surrounding area. Underlying the entire area and the proposed site in particular is the Floridan aquifer. The properties of the Floridan aquifer in coastal Citrus County, including the proposed site, can vary enormously over relatively short vertical distances. This variability impacts the movement of groundwater. The groundwater under the proposed site is classified as G-II. The terms "potentiometric surface" are used to describe the level to which groundwater will rise above sea level. The higher groundwater rises above sea level, the thicker the layer of underlying drinkable water should be before reaching an interface between drinkable and undrinkable water. In central Citrus County, the potentiometric surface is relatively low and flat at approximately 5 or 6 feet above sea level. The resulting interface between drinkable and nondrinkable water is found at 200 or more feet. Due to natural geological conditions, moving to the northwest of Citrus County, including the Greenway Canal area, potentiometric levels are higher. Therefore, thicker layers of drinkable water should be found around the proposed facility site and the Greenway Canal than in central Citrus County. Because of higher potentiometric surface in the area of the Greenway Canal, the layer of drinkable water would be expected to continue beyond 120 feet below the surface. Construction of the Greenway Canal has resulted in the intrusion of saltwater from the Greenway Canal into the groundwater. It has also resulted in the upconing of mineralized (sulfate) waters from deeper to less deep levels within the Floridan aquifer. These impacts have been significant with regard to the chloride levels (from the saltwater) and sulfate upconing. The impact of the construction of the Greenway Canal on saltwater intrusion and sulfate upconing is the result of the lowering of the surface waters to sea level in the Greenway Canal. The lowering of the level of water in the Greenway Canal has had the effect of decreasing the potentiometric surface and, consequently, reducing the thickness of the layer of drinkable groundwater. Saltwater has intruded along and beneath the Greenway Canal. The extent of this intrusion is represented graphically on Petitioner's exhibits 13 and 14. Saltwater intrusion has occurred primarily as a result of downward leakage of saltwater traveling up the Greenway Canal. The saltwater intrusion has been localized around the Greenway Canal. The wedge of saltwater intrusion has reached to approximately where U.S. Highway 19 crosses the Greenway Canal, approximately one-half mile east of the proposed site. Although it is "theoretically" possible that the saltwater wedge could continue to move along the entire length of the Greenway Canal, the evidence fails to support such a conclusion. Due to freshwater discharges from Lake Rousseau, the evidence supports a conclusion that the saltwater wedge will not move further eastward to any significant extent. The lowering of the waters of the Greenway Canal to sea level has had the effect of bringing sea level elevations to the Floridan aquifer several miles further inland than had been the case before construction of the Greenway Canal. Groundwater adjacent to the Greenway Canal, which is at levels higher than sea level, has discharged into the Greenway Canal. This has caused a lower groundwater level and the movement upward of groundwater. Similar effects have occurred naturally along the Withlacoochee River. As groundwater rises it comes into contact with a geologic unit which contains calcium sulfate. The sulfate mixes with the groundwater causing the "mineralized" groundwater. While the change in surface waters in the Greenway Canal was quick, the change in groundwater quality from saltwater intrusion and sulfate upconing has taken place only as fast as groundwater in the area flows. Generally, groundwaters flow very slowly. The impact of the Greenway Canal on upconing of sulfates will continue over time. Mineralized waters will continue to move upward and, perhaps, laterally away from the Greenway Canal. Pockets of mineralized waters (containing sulfates) can be found naturally occurring around the proposed site. Sulfate enriched groundwater in coastal areas naturally move toward, and discharge into, the surface waters along the coastal boundary. This process occurs along the Gulf of Mexico and the shoreline of Citrus County. The construction of the Greenway Canal has disrupted this natural process. The Mine Pit, when it was in use, was dewatered to different levels at various times. The dewatering took place for varying periods of time. Usually, the Mine Pit would be completely dewatered for a period of approximately three months. On one occasion, the Mine Pit was dewatered for a period of two years (1989 to 1991). It was dewatered to allow the removal of dolomite. The Mine Pit was allowed to fill back up with water after each dewatering. The dewatering of the Mine Pit was regulated by the Water Management District. The permit allowing dewatering of the Mine Pit required that the permit holder mitigate for adverse impacts of dewatering, including the inducement of natural contaminants into the aquifer. The evidence failed to prove, however, the extent of adverse impacts of the dewatering or whether the permit holder actually mitigated against any such adverse impacts. The lowering of the water level in the Mine Pit caused some upconing of sulfates for the same reason that the digging of the Greenway Canal did. Lowering the water level in the Mine Pit lowered the potentiometric level. The evidence, however, failed to prove the extent of the impact or how long the impact lasted. The lowering of the water level of the Mine Pit to sea level by connecting the Mine Pit to the Greenway Canal as proposed by Marina will have the same general impact as the digging of the Greenway Canal on the upconing of sulfates. Unlike the impact of the dewatering of the Mine Pit, the proposed modification will be permanent. Lowering the water level will have the same type impact for the same reasons that the digging of the Greenway Canal caused upconing. The potentiometric level will be permanently lowered; the layer of drinkable water will be permanently decreased. The evidence failed to prove that the lowering of the water level of the Mine Pit to sea level as a result of the proposed project will have the same impact on saltwater intrusion. This impact is less likely because the Mine Pit is four and a half miles inland from the Gulf of Mexico. The upconing of sulfates as a result of the construction of the proposed facility will cause the levels of sulfates found in some portion of the currently drinkable layer of groundwater to exceed water quality standards. The area impacted will consist of groundwater which would otherwise have been expected to be potable. Comments concerning the proposed facility were provided to the Department by the Water Management District. By letter dated August 16, 1995, the Water Management District informed the Department that it was anticipated that the proposed facility would result in saltwater intrusion and upconing of mineralized water and that the area's groundwater could be expected to be degraded inconsistent with Water Management District rules. In response to the Water Management District's comments, Marina agreed to undertake a hydrogeologic study to gather site specific information to address those concerns. As a part of Marina's study, one monitoring well was drilled on the proposed site. The well was drilled to a depth of 450 feet in order to gather data concerning water quality at various depths. In early 1996, the Water Management District concluded that the results of the study undertaken by Marina had resolved its concerns. The test well was drilled to the south of the Mine Pit, approximately 2500 feet from the Greenway Canal. The water quality tests run on water taken from the test well reflected a sharp change in water quality at a depth of approximately 120 feet. The water below that level contained high levels of sulfates: 552 milligrams per liter of sulfate. Immediately above the high sulfate waters, low sulfate levels (12 milligrams per liter) were found. This result is contrary to what would be expected to be found based upon the higher potentiometric surface in this area of Citrus County. Because the potentiometric surface is higher in the area, it would be expected that the layer of drinkable groundwater would be considerably higher than 120 feet. The findings concerning the thickness of the drinkable groundwater found at the test well are consistent with the conclusions concerning the impacts of the digging of the Greenway Canal. As a result of the digging of the Greenway Canal and the lowering of the water level to sea level, the resulting decrease in the potentiometric surface has caused the upconing of mineralized waters and a decrease in the layer of drinkable groundwater. The Department and Marina have not disputed the fact that drinkable groundwater will be impacted by the upconing of mineralized waters (sulfates) as a result of connecting the Mine Pit with the Greenway Canal and lowering the level of water in the Mine Pit to sea level. The Department and Marina, however, have suggested that the extent of the impact of the lowering of the water level in the Mine Pit will not extend more than 100 feet from the Mine Pit and will be limited to the proposed site. The evidence failed to support this position. The unplugging of the Mine Pit will have the effect of increasing the area of water below sea level in the area by 12 percent of the size of the area of the Greenway Canal. Data from test wells around the Greenway Canal and other data has indicated that the upconing of mineralized water as a result of the lowering of the water level in the Greenway Canal has extended considerably more than 100 feet from the Greenway Canal. In light of the fact that the Mine Pit is equal in surface area to 12 percent of the surface area of the Greenway Canal, there is reason to be concerned that the area of impact from the lowering of the water level in the Mine Pit will also be significant. In light of the foregoing, and due to the variability of the geology of the area, the data from a single well on the site is of questionable value. Data from a single well simply does not provide the information necessary for Marina to provide reasonable assurances that the impact on groundwater from its proposed facility will be limited to an area of 100 feet from the Mine Pit. There is simply not enough data concerning the Mine Pit to conclude with any reasonable assurance that the upconing of mineralized waters (containing sulfates) will be limited to an area of 100 feet around the Mine Pit. Because of the size of the Mine Pit in relation to the Greenway Canal and the impact on upconing from the Greenway Canal, it is more likely that the impact of upconing will exceed 100 feet. A log of geologic characteristics of the test well was maintained. A confining unit or layer was found between the high-sulfate and low-sulfate waters at between 110 and 120 feet below the surface. The evidence failed to prove, however, the extent to which the layer may extend horizontally from the well location. In light of the general geology of Citrus County and the region around the proposed site, insufficient data exists to reach any conclusion about the extent of the confining layer. Establishing the extent of the confining layer would require more extensive (and costly) study of the site. The existence of a confining layer would also have no significant impact on the degree of upconing as a result of lowering the water level in the Mine Pit. I. Surface Water Quality Standards. Petitioners stipulated that the proposed facility would not violate surface water quality standards except with regard to the standard for chloride. Because of the flow of fresh water from Lake Rousseau and the flushing canal to be constructed at the proposed site, reasonable assurances have been given by Marina that there will be sufficient flushing of the Mine Pit to preclude a violation of chloride standards for surface waters. The evidence presented by Petitioners concerning the possibility that the salt water wedge resulting from the construction of the Greenway Canal may extend landward and eventually into the Mine Pit was too speculative and "theoretical".

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Department of Environmental Protection enter a Final Order denying Citrus Recreational Marina, Inc.'s application for wetland resource permit (dredge and fill) and the application for Management and Storage of Surface Waters Permit. DONE and ENTERED this 18th day of November, 1996, in Tallahassee, Florida. LARRY J. SARTIN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 18th day of November, 1996. COPIES FURNISHED: Robert Goodwin, Esquire Save the Manatee Club, Inc. 500 North Maitland Avenue, Suite 210 Maitland, Florida 32751 Peter Belmont, Esquire 511 31st Avenue, North St. Petersburg, Florida 33704 Wayne Hrydziusko Assistant General Counsel Douglas H. MacLaughlin Assistant General Counsel State of Florida, Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Richard S. Brightman, Esquire Douglas Roberts, Esquire HOPPING, GREEN, SAMS & SMITH, P.A. Post Office Box 6526 Tallahassee, Florida 32314 Perry Odom, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virginia B. Wetherell, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (7) 120.57267.061373.413373.414403.412403.851403.852 Florida Administrative Code (11) 40D-4.10140D-4.30162-312.01062-312.08062-4.04062-4.05062-4.07062-520.20062-520.42062-522.41062-550.320