The Issue The issue for determination at the final hearing was whether the contracting license of the Respondent Konrad v. Ising should be suspended, revoked, or otherwise disciplined by the Petitioner Department of Professional Regulation, for alleged violations of Chapter 489, Florida Statutes. At the final hearing Petitioner's Exhibits 1 and 2(a)-(g) were offered and admitted into evidence. The Respondent testified on his own behalf.
Findings Of Fact The Respondent Konrad V. Ising is licensed to practice contracting in Florida, and is a licensed certified general contractor holding license number CG C009669, a license current and active from 1982 through the present. The Respondent qualified Master Craft Constructors using license number CG C009669. During 1982, the Respondent entered into an association with Carlton Mosher whereby the Respondent would use his contractor's license to obtain building permits for construction projects which Mosher had contracted. The Respondent hoped his association with Mosher would lead to a partnership and assist him in obtaining practical experience in the construction field. During his association with the Respondent, Mosher was not a licensed contractor. In December 1982, Mosher, doing business as Re-Builders, contracted with Russell Hirstins to construct a room addition on his home at 4034 27th Avenue, St. Petersburg, Florida. On December 3, 1982, an application for a building permit for the job was submitted to the City of St. Petersburg and permit number 88638 was issued. The permit was obtained using the Respondent's license number and Respondent is listed as the job contractor. However, the Respondent performed no work on the Hirstins job, maintained no control over Mosher's work, failed to adequately supervise the project, and failed to qualify Re-Builders with the Construction Industry Licensing Board. Since becoming licensed in 1975, the Respondent has not been involved in any other disciplinary proceedings. At the final hearing, the Respondent candidly acknowledged that his association with Mosher was a regrettable mistake. The project was completed by Mosher to the apparent satisfaction to the Hirstins.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That a Final Order be entered by the Construction Industry Licensing Board finding the Respondent Konrad V. Ising guilty of violating Section 489.129(1)(g) and (j), Florida Statutes, and imposing a $250 administrative fine. DONE AND ORDERED this 30th day of January 1984, in Tallahassee. SHARYN L. SMITH Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January 1984. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Konrad V. Ising Post Office Box 1023 Maitland, Florida 323751 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32302
The Issue Whether Respondent, a licensed general contractor, committed the violations alleged in the three-count Administrative Complaint filed by Petitioner and the penalties, if any, that should be imposed.
Findings Of Fact Respondent is the agency of the State of Florida with the responsibility to regulate building contracting. At all times relevant to this proceeding, Respondent has been licensed as a certified general contractor, having been issued license number CG C058340 in 1996. At all times relevant to this proceeding, Ms. McKinney owned and resided in a house (the House) in Opa Locka, Florida. Ms. McKinney’s mother, Mattie P. Mathis, also lived in the House. In 2001, Ms. McKinney solicited bids for an addition she wanted to put on the House. Ms. McKinney and her mother, Ms. Mathis, planned to pay for the addition with life insurance proceeds on the life of Ms. Mathis’s deceased daughter (Ms. McKinney’s sister). On the recommendation of a colleague at her work, Ms. McKinney asked Willie Muse, Jr., to bid on the work. Based on the bids she received, Ms. McKinney hired Mr. Muse to construct the addition to the House. Ms. McKinney told Mr. Muse that she wanted all work to comply with all applicable permitting requirements and laws. Mr. Muse represented to Ms. McKinney that he would get the necessary building permits and that the work would comply with all applicable laws. On July 18, 2001, Ms. McKinney and Ms. Mathis entered into a written contract with Mr. Muse whereby Mr. Muse agreed to construct the addition for the sum of $45,000.00. Mr. Muse has never been licensed as a general contractor in Florida. Ms. McKinney thought Mr. Muse was a licensed contractor and would not have entered into a contract with him if she had known that he was not licensed. Pursuant to the contract, Ms. McKinney and Ms. Mathis paid Mr. Muse the following amounts on the following dates: $6,000.00 on July 20, 2001; $7,500.00 on October 10, 2001; and $13,500.00 on November 2, 2001; for a total of $27,000.00. On or about August 21, 2001, Mr. Muse brought to Ms. McKinney a building permit application form for her to sign. The application form had been filled out before Mr. Muse presented it to Ms. McKinney. Respondent was not present when Mr. Muse presented the form to Ms. McKinney. Respondent’s name, signature, and contractor’s license number appeared on the application form when Mr. Muse presented the form to Ms. McKinney. Ms. McKinney signed the form on August 21, 2001. Ms. McKinney saw Respondent’s name for the first time when she read the building permit application form. Prior to that time, Ms. McKinney and Ms. Mathis had never known or heard of Respondent. At all times relevant to this proceeding, Respondent knew that Mr. Muse was not a licensed contractor. Mr. Muse submitted the building permit application form to the Miami-Dade County Building Department (Building Department), which issued a building permit for the work on the House on October 5, 2001. Mr. Muse commenced working on the House in October 2001, but he never finished. After he received the payment in November 2001, Mr. Muse stopped working on the House for an extended period of time. During that time, Ms. McKinney attempted on several occasions to persuade Mr. Muse to resume work on the House. Prior to stopping work on the House, Mr. Muse removed a portion of the roof of the existing structure, which exposed the interior of the House to the elements. That exposure resulted in extensive damages to the House, including the collapse of the kitchen ceiling from water intrusion. By letter dated April 15, 2002, the Building Department advised Ms. McKinney that her building permit would expire in approximately 30 days. That letter prompted Ms. McKinney to contact the Building Department, where she was told that Respondent was her contractor, not Mr. Muse. Ms. McKinney secured information (from the face of the building permit) that enabled her to contact Respondent’s mother.3 That contact resulted in two meetings between Ms. McKinney and Respondent towards the end of April 2002. During the first meeting, Ms. McKinney related to Respondent the history of the project, including the amounts that had been paid to Mr. Muse. She also showed him the work that had been done and the damages that had occurred. During the second meeting, Mr. Muse was in attendance. Ms. McKinney, Ms. Mathis, and Respondent reached a verbal understanding that was not reduced to writing. They agreed that Respondent would finish the work on the House for the unpaid balance of the contract price $45,000.00 less $27,000.00 paid to Mr. Muse, which equals $18,000.00.4 The parties agreed that Respondent would pay for labor and that Ms. McKinney and Ms. Mathis would pay material suppliers directly and receive credit toward the contract price for such payments. The parties contemplated that Mr. Muse would perform most of the labor because of the monies he had already received. On the basis of the verbal contract, Respondent resumed the work on the House. On June 12, 2002, Respondent presented a draw request for $3,500.00 for electrical, plumbing, and roofing work that had been performed. Ms. Mathis wrote Respondent a check in the amount of $3,500.00 for that work. Ms. McKinney was opposed to paying Respondent the sum of $3,500.00 because she believed he had not completed the work for which he was billing. Ms. Mathis paid that sum despite Ms. McKinney’s opposition. At some undetermined time following June 12, 2002, Ms. McKinney told Respondent that she did not want Mr. Muse working on the House. Respondent then asked to be paid in advance for work to be done on the House because he would have to pay his laborers. Ms. McKinney and Ms. Mathis would not agree to payment in advance. In July 2002, the project was not complete and Respondent’s progress on the work on the House became unsatisfactory to Ms. McKinney. On October 14, 2002, Ms. McKinney filed a complaint against Respondent with Petitioner, claiming, among other things, that Respondent had abandoned the project. Her complaint alleged that work ended on the project in July 2002. At some undetermined time between June and October 2002, Ms. McKinney filed a criminal complaint against Mr. Muse, which resulted in criminal misdemeanor charges being filed against him in Miami-Dade County Court. After she filed the criminal complaint against Mr. Muse, Ms. McKinney told Respondent that she wanted to wait to proceed with the project until she knew what was going to happen with her criminal complaint. In the criminal proceeding, the Court ordered Mr. Muse on April 11, 2003, to pay restitution to Ms. McKinney in the amount of $16,008.04, payable in monthly installments of $300.00. On March 2, 2004, the Court reduced the amount of restitution to $4,000.00, payable in monthly installments of $50.00 beginning April 1, 2004. As of the date of the final hearing in this proceeding, Mr. Muse had paid Ms. McKinney restitution in the total amount of $750.00. As part of the criminal proceeding, Respondent was asked to give his opinion as to the value of the work completed by Mr. Muse and his estimated cost of completing the work. Respondent valued the work completed by Mr. Muse at $14,073.75 (labor and materials). Respondent estimated that it would cost $22,200.00 to complete the project. Both estimates were dated March 23, 2003. On October 1, 2003, Theodore R. Gay, Assistant General Counsel for Petitioner wrote Ms. McKinney the following letter pertaining to the complaint she had filed in October 2002: The Legal Department has evaluated your complaint against the above named contractor [Respondent]. After reviewing the evidence gathered during the investigation of the referenced matter, we have determined that in accordance with the rules and policies of the Construction Industry Licensing Board, this case is appropriately closed with the issuance of a Letter of Caution to the contractor. Because this case has been dismissed without a finding of probable cause, the file will remain confidential and exempt from the public records. On January 6, 2004, Ms. McKinney wrote Mr. Gay a letter that provided, in part, as follows: This letter is a request to re-open the case [against Respondent] because as prior conversation (sic) when I spoke to you in late August 2003 or early September 2003, I informed you that Mr. Jones told me that he would help me as much as possible to complete the construction on my property. Since your letter that stated you didn’t find any error on Mr. Jones’ behalf, I have not heard or seen him since October 2003, nor has any work been performed on my property. . . . Respondent came back to the House after October 2003 and talked to Ms. McKinney about the work. Ms. McKinney told him that she would pay up to a total of $45,000.00 for the work, but that she would not pay above that figure. Because of the estimate Respondent provided in the criminal proceeding dated March 23, 2003, Ms. McKinney believed that Respondent wanted $22,0000.00 to complete the work. However, Respondent never told her that he would not complete the work for a sum equal to $45,000.00 less the sums that had already been paid. Ms. McKinney would not pay Respondent for work until after the work was completed. After Mr. Gay’s letter dismissing the complaint that Ms. McKinney had filed, Respondent did no further work on the House, but he did have further conversations about the project. Ms. McKinney and Respondent could not agree on payment terms for Respondent to complete the project. Ms. McKinney testified that she did not fire Respondent. However, it is clear that she would not let Mr. Muse do further work on her house and she would not pay Respondent until after the work had been done. Ms. McKinney changed the terms of her verbal contract with Respondent by prohibiting Mr. Muse from working on the project. In November 2003, Ms. McKinney and Ms. Mathis had an argument over the money that had been spent on the house. Ms. McKinney talked to Respondent about his helping her obtain a mortgage on the house to pay for the balance of the work on the House. Ms. McKinney told Respondent that she did not want Respondent to ask her mother for any more money. Ms. McKinney told Respondent that she would use him as the contractor to complete the work if she obtained the financing. Ms. McKinney was unable to get the financing due to the condition of the House. The permits obtained by Respondent are still valid. Ms. McKinney has hired various workers on her own in an effort to complete the work on the House. As of the final hearing, the work on the House had not been completed. As of May 19, 2005, Petitioner’s costs of investigation and prosecution of this case, excluding costs associated with attorney time, totaled $920.29.
Recommendation Based on the foregoing findings of fact and conclusions of Law, it is RECOMMENDED that Petitioner enter a Final Order that adopts the Findings of Facts and Conclusions of Law set forth in this Recommended Order. It is further recommended that the Final Order: Find Respondent guilty of the violation alleged in Count I of the Administrative Complaint and impose against him an administrative fine in the amount of $2,500.00; Find Respondent guilty of the violation alleged in Count II of the Administrative Complaint, but impose no additional administrative fine for that violation; Find Respondent not guilty of the violation alleged in Count III of the Administrative Complaint; Order that Respondent be jointly and severally liable to Ms. McKinney and Ms. Mathis with Mr. Muse for restitution in the amount of $4,000.00, minus $750.00 paid by Mr. Muse; and Order Respondent to pay costs of investigation and prosecution of this matter in the amount of $920.29. DONE AND ENTERED this 10th day of August, 2005, in Tallahassee, Leon County, Florida. S CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of August, 2005.
The Issue Did Respondent violate Section 489.129(1)(h), Florida Statutes, and, if so, what discipline should be imposed?
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Department is the agency of the State of Florida vested with statutory authority to regulate the practice of contracting under Chapters 455 and 489, Florida Statutes. Respondent is a licensed certified residential contractor in the State of Florida. Respondent's license number, as certified by Julie Odom, Department's Alternate Records Custodian, is CRC 20166. However, the Administrative Complaint alleges the license number to be CR C020166. Respondent's licensure status is "Delinquent, Active." On May 18, 1989, the Department entered a Final Order in DOAH Case No. 88-3308 wherein Respondent was found guilty of violating Section 489.129(1)(h),(j),(k), and (m), Florida Statutes. On September 27, 2000, the City of Cape Coral, Florida, Contractor's Regulatory Board (Board) entered into a Settlement Agreement (Agreement) with Respondent, in regard to a complaint, Case No. 00-01, wherein Respondent was charged with violating the following Sections of the City of Cape Coral Code of Ordinances: 6-10.1:, To make misleading, deceptive, untrue, or fraudulent representations in the practice of his contracting profession; 6-10.8: Diversion of funds or property received for prosecution or completion of a specified construction project or operation when as a result of the diversion, the contractor is or will be unable to fulfill the terms of his obligation or contract; 6-10.10: Failing in any material respect to comply with the provisions of the Code; 6-10.11: Abandoning of a construction project in which the contractor is engaged or under contract as a contractor. A project is to be considered abandoned after 90 days if the contractor terminates the project without notification to the prospective owner and the City and without just cause; and 6-10.13: Being found guilty of fraud or deceit or of gross negligence, incompetence, or misconduct in the practice of contracting. The Agreement provided that Respondent was pleading No Contest to the charges that he violated the aforementioned sections of the City of Cape Coral's Code of Ordinances and that Respondent's plea did not act as an admission of guilt as to the above mentioned charges. The Agreement provided for Respondent's permit pulling privileges to be revoked for a period of 90 days starting August 23, 2000. By an Order dated December 29, 2000, the Board, after hearing and discussing the charges made against Respondent, voted to accept and approve the Agreement. By this Agreement, Respondent's contracting license was disciplined by the City of Cape Coral. The total investigative and prosecution costs to the Department, excluding costs associated with any attorney's time, is $967.09.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, and a review of Chapter 61G4-17, Disciplinary Guidelines, Florida Administrative Code, with consideration for the repeat violation of Section 489.129(1)(h), Florida Statutes, it is RECOMMENDED that the Department enter a final order finding Respondent, Robert Mensching guilty of violating Subsection 489.129(1)(h), Florida Statutes, and for such violation: (a) impose an administrative fine in the amount of $5,000.00; (b) assess costs in the amount of $967.09; and (c) revoke Respondent's Certified Residential Contractor's License. DONE AND ENTERED this 21st day of March, 2003, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of March, 2003. COPIES FURNISHED: Kimberly V. Clark, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Robert Mensching 1719 Northeast 23rd Terrace Cape Coral, Florida 33909 Robert Crabill, Executive Director Construction Industry Licensing Board Department of Business and Professional Regulations Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Hardy L. Roberts, III, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-2202
Findings Of Fact These proceedings were set for final hearing by a Notice of Hearing dated July 8, 1983 addressed to the parties, including Respondent at 488 Esther Lane, Altamonte Springs, Florida, 33596. 2/ The Notice of Hearing was not returned to the Division of Administrative Hearings as undelivered. At the time and place noticed for the final hearing the Hearing Officer waited until 9:16 a.m., to commence the proceedings, which concluded at 11:08 a.m. At no time has the Respondent contacted the Hearing Officer concerning a continuance or explained his failure to appear as noticed. At all times material to this proceeding Mr. McIntee has been licensed as a certified building contractor under license number CB C015923. He was also the qualifying agent pursuant to Section 489.119, Florida Statutes, for Delco, Incorporated. At no time has he ever attempted to qualify or otherwise notify the Construction Industry Licensing Board that he intended to affiliate with or do business as Earth Shelter Corporation of Florida, Inc. On July 30, 1980 Earth Shelter Corporation of Florida, Inc. (Earth Shelter) entered into a contract with Mr. and Mrs. William Sweet to construct an earth shelter single family residence in Lake County, Florida. The estimated cost of the project was to be $57,000 and was guaranteed not to exceed $60,000. The contract was negotiated by Respondent acting as president of Earth Shelter. Mr. McIntee was the contractor who pulled the building permit on behalf of Earth Shelter. The project was financed by First Family Federal Savings and Loan Association of Eustis, Florida. In order to obtain payments from the Association, Respondent periodically executed affidavits which stated in part: Affiant says further that all the subcon- tractors, materialmen or any other persons performing labor and furnishing materials used in the construction of the building, or improvements to the premises or appur- tenances thereof, have been fully paid in- cluding all extras. As the result of executing these affidavits Respondent received draws totaling $49,079.26 on the dates of September 30, 1980, October 31, 1980, December 3, 1980, February 4, 1981 and July 10, 1981. These affidavits were false. At the time the affidavits were executed all the subcontractors had not been paid by Respondent. As an example, Frank Wagner Excavating, Inc. performed subcontracting services at the Sweet project on June 4 and 5, 1981 at a cost of $1,451. This was billed to Respondent on June 6, 1981. He sent Wagner Excavating a check dated June 6, 1981, in the amount of the invoice, but the check was returned to Wagner for lack of sufficient funds at Respondent's bank. Before Respondent's check bounced, but subsequent to invoicing the work done on June 4 and 5, 1981, Mr. Wagner performed additional earth moving work at the Sweet project on July 3, 8, 9 and 10, 1981. That work was invoiced on July 10, 1981 for $1,378.75. No attempt was made by Respondent to pay for the second invoice. Eventually Wagner Excavating was paid by Mr. Sweet personally and by an additional payment directly to Wagner Excavating by First Family Federal Savings and Loan Association in order to satisfy Wagner's lien. In order to protect himself, Wagner had filed a lien against the Sweet property on August 17, 1981. Because of structural defects in the construction of Mr. Sweet's home performed by Respondent, Mr. Sweet filed a complaint with the Lake County Board of Examiners against Respondent. Notice of that complaint was given to Respondent on August 18, 1981. He was informed that on September 1, 1981 the Lake County Board of Building Examiners would take testimony concerning the allegations contained in the complaint. Respondent was urged to attend the meeting and to be represented by counsel if he so desired. Mr. McIntee did appear at that meeting. An investigation of the complaint followed. Respondent was subsequently noticed for a second meeting of the Board of Examiners to be held on October 6, 1981 concerning the Sweet complaint, but he failed to appear. At that time the results of the investigation were reviewed and the Lake County Board of Examiners revoked Respondent's license as a contractor in Lake County for abandonment and code violations related to his work on Mr. Sweet's residence. On September 19, 1980 Earth Shelter through Respondent entered into a contract with James V. Migliorato to construct a residence in Seminole County, Florida. The contract price was $48,500. During the course of the work performed by Mr. McIntee, liens in the amount of approximately $9,500 were filed by third parties who provided materials and services under subcontract to Earth Shelter in the construction of Mr. Migliorato's residence. By March of 1981 Respondent had abandoned the project without cause. Mr. Migliorato later met with him at which time Respondent explained that he had run out of money and was not going to finish the job. In August of 1981 Mr. Migliorato and his counsel met with Respondent and his counsel. During their discussions Respondent stated that the money which he had been paid for work on the Migliorato home had been diverted by him for use on the Sweet residence mentioned above. The liens outstanding against Mr. Migliorato's property were never satisfied by Respondent and had to be paid by the homeowner. An example of the outstanding liens was that filed by Superior Distributors, Inc. which supplied and installed a kitchen and bathroom cabinet at the Migliorato residence. The work was completed on June 30, 1981 and invoiced on the same date for $2,128. This invoice has never been paid by Respondent.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Construction Industry Licensing Board enter a Final Order revoking Respondent's license as a certified building contractor in the State of Florida. DONE and RECOMMENDED this 14th day of October, 1983, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1983.
The Issue Did respondent fail to properly supervise, direct and manage the contracting activities of the business of which he is the qualifier, and if so, what disciplinary action should be taken against respondent's contracting license?
Findings Of Fact At all times material to this proceeding the respondent was a certified building contractor licensed by the State of Florida and the qualifying agent for Custom Concrete of Naples, Inc. (Custom Concrete). Rodney Velez was the president of Custom Concrete and licensed only in concrete--concrete forming, placing and finishing. Susan Velez, Rodney Velez's wife, was an officer of Custom Concrete. On April 23, 1983, Custom Concrete, by and through Rodney Velez, entered into a contract with Mark and Penny Paterson to construct a home for $38,550.00. Mrs. Paterson had previously met Rodney Velez in the course of her work, and Velez had told her that he was a builder. Mrs. Paterson had suggested that Velez look at a floor plan that she and her husband had, and after certain negotiations, including a change of floor plan, the contract was entered into. During the course of the negotiations Mrs. Paterson never talked to the respondent and was unaware that the respondent was involved or would be involved in the construction of the home. Mrs. Paterson believed that Rodney Velez was the "builder"; however, the construction of the Paterson home was beyond the scope of Velez's concrete license. The respondent signed the application to secure the building permit for the Paterson residence, although he did not personally appear to procure the building permit. The clerk of the contractor's licensing section of the building code compliance department relied on the signature on the application because it was notarized. The notary was Susan Velez. Respondent did not supervise or direct the construction of the Paterson home. Neal Jackson, president of the company who did the electric work on the home, was unaware that respondent was involved in the project until well after the house was finished. Although it is usual for a supervisor or superintendent to be at the job site some of the time, Jackson never saw the respondent or Velez at the job site. Jeff Allain, the carpenter who did the framing and certain other work, was on the job site five or six days and saw the respondent once during the framing of the structure "just generally looking around." The respondent didn't say anything to Allain. David Isom did drywall work on the house. He had no contact with the respondent and did not see him at the construction site. Mrs. Paterson went by the construction site quite often and realized that the job was not being properly supervised. Velez was rarely there, and Mrs. Paterson never saw the respondent. The workmen on the site would ask the Patersons when Velez would be there because they had questions concerning the work. Neither of the building inspectors saw anyone supervising at the job site, although usually no one is at the job site when an inspection is made. Two days after the Patersons moved into their house, they compiled a "punch list" of the items that needed to be completed or corrected. The list was given to Velez, but the work was not corrected to the Paterson's satisfaction. Although Velez did not give the "punch list" to respondent, Velez discussed the problems with the respondent. Respondent did not take any steps to remedy the problems and said he thought "a lot of it was nonsense." Velez told respondent that he, Velez, would take care of it. Because of the unresolved problems with the house, Mrs. Paterson finally called the licensing board to file a complaint against Rodney Velez. At that time, she was informed that Rodney Velez was not the contractor; the contractor was the respondent. This was the first time that Mrs. Paterson was aware that the respondent was involved with the construction of the house. All of the Patersons dealings had been with Velez, and all checks for construction payments were made out to Velez personally. 2/ Even though the Patersons had not received satisfaction from Custom Concrete for the problems with the house, they signed the closing papers because Velez threatened to evict them. At closing the Patersons received a lien release from Custom Concrete which released all work prior to March 9, 1984. Subsequently, Velez filed a claim of lien against the Paterson property for work completed on February 9, 1984.
Recommendation Based upon the foregoing findings of fact and conclusions of law it is recommended that respondent be found guilty of violating Section 489.129(j), Florida Statutes, that he be fined $1,000.00, and that his license be suspended for 60 days from the date the Construction Industry Licensing Board enters its final order in this case. DONE and ORDERED this 30th day of January, 1985, in Tallahassee, Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January, 1985.