Find 49 similar cases
DUNES GOLF AND COUNTRY CLUB vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 78-000756 (1978)
Division of Administrative Hearings, Florida Number: 78-000756 Latest Update: Sep. 21, 1978

Findings Of Fact The Dunes Golf and Country Club, Sanibel, is a partnership owned by John K. Kontinos and William R. Frizzell. They operate a nine hole golf course consisting of 65 acres of the eastern portion of Sanibel Island. The golf course is open to the public and, during the winter season, some 150 to 175 persons utilize the facility daily, but in the period May--November, it is utilized by only about 15 or 20 persons per day. The golf course is presently irrigated by water obtained from the lower Hawthorn and Suwannee aquifers through a well that is approximately 737 feet deep. On the days that water is pumped from the well, the pumping duration is from 8 to 12 hours per day, but the monthly hours during which pumping occurs averages approximately 155 hours per month. There is another existing well in another portion of the applicant's property which extends 896 feet into the Suwannee aquifer. The well presently in use (well number 1) has 546 feet of casing and the well that is not in use (well number 2) has 700 feet of casing. (Testimony of Kontinos, Exhibits 2, 4) On December 15, 1977, the Dunes Golf and Country Club submitted an application to the South Florida Water Management District for a consumptive use permit to withdraw 320 acre feet of groundwater per year to irrigate an area of approximately 109 acres. The intent of the application was to obtain a sufficient quantity of water to irrigate the golf course which the applicant intends to enlarge to consist of 18 holes. The additional 9 holes would cover some 44 acres and well number 2 is intended to be activated to provide additional water for this purpose. (Testimony of Kontinos, Keiling, Exhibits 1- 2) The South Florida Water Management District issued the required public notice of the application on March 30, 1978, and objections to the application were received by that agency from the City Council of Sanibel, the Island Water Association, Inc., and George R. Campbell. Public notice of hearing on the application was duly published on March 30, 1978. (Exhibits 5-7) The staff of the South Florida Water Management District reviewed the application and recommended continuation of the applicant's existing use from the lower Hawthorn Formation and use of additional irrigation water from the Suwannee aquifer in the total amount of 320 acre feet annually. It also recommended that the issuance of a permit should be conditioned in various respects to include semiannual submission of water quality data and pumpage records for each well, installation and maintenance of well controls, and repair or replacement of well casings, valves or controls that leak or become inoperative. The staff further recommended that maximum monthly withdrawals from the lower Hawthorn Formation be limited to 7.5 million gallons and 7.6 million gallons from the Suwannee Formation. At the hearing however, the South Florida Water Management District representative changed these recommendations to 8.9 MO and 6.1 MG respectively. Additionally, the initial recommendation of 320 acre feet annual withdrawal was reduced to 200 acre feet. This amount is considerably less that the average of 600 acre feet used on other comparably sized golf courses. Further the staff representative recommended at the hearing that a further condition be attached to the issuance of the permit; i.e., Condition 15, which requires the permittee to submit analyses of total dissolved concentrations in water samples from each well within 30 days of permit issuance and, if such concentration exceeds 4,000 MG/L, logging procedures as to the affected well will be required with necessary safeguards to be employed to eliminate any interaquifer leakage. (Testimony of Gleason, Exhibit 4) The objections of the City of Sanibel and the Island Water Association, Inc. involved concerns that further withdrawals from the lower Hawthorn aquifer will affect the availability of water which is treated by the water association for general island use. In addition, there is concern about possible contamination of the lower Hawthorn aquifer from interaquifer leakage. The Water Association is a member-owned cooperative that is not under the jurisdiction of the municipality. It is concerned about the draw down in the water table which will be occasioned by additional withdrawals by the applicant. It therefore believes that pumping tests should be conducted prior to the issuance of a permit to provide information concerning the capacity and safe yield of the wells. Although an Association expert testified that the proposed Dunes' withdrawal would create a cone of depression that would extend into and influence the existing Water Association wells, the evidence shows such influence to be minimal due to the fact that the Dunes wells are almost three miles away from the nearest Association well. Further, due to the limited time that the Dunes wells are pumped each day, the aquifer recovers to a certain extent during other hours. Although concerns are felt by the Water Association that water quality will be affected because of leakage from the Suwannee aquifer to the lower Hawthorn aquifer due to possible corrosion of steel casings in the Dunes wells, no evidence was presented that such casings are in fact defective and will contribute to degradation of water quality because of additional withdrawals. The additional special condition placed upon the issuance of a permit by the South Florida Water Management District will require correction of any such leakage that is discovered in the future. Previous studies show that the lower Hawthorn aquifer is separated from the Suwannee aquifer by the Tampa Limestone Formation which would slow down any entry of poorer quality water into the Hawthorn aquifer. It is found that the lesser amounts of water recommended by the South Florida Water Management District at the hearing will further reduce the likelihood of water quality degradation or draw down in other Island wells. (Testimony of Butler, Holland, Nuzman, Gleason, Exhibits 6, 8-13) Ecological concerns were expressed at the hearing by a public witness as to the wastefulness of irrigating golf coup Yes and the requirement for fertilizer in sandy soil which causes leaching of nutrients after heavy water use. (Testimony of Webb)

Recommendation That a permit be issued to the applicant authorizing the consumptive use of the quantity of water recommended by the South Florida Water Management District staff, subject to the recommended conditions thereto. THOMAS C. OLDHAM Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: John H. Wheeler Post Office Box V West Palm Beach, Florida 33402 James D. Decker, Esquire Post Office Box 200 Ft. Myers, Florida 33902

Florida Laws (2) 373.019373.223
# 1
RALPH JENSEN vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-002064 (1989)
Division of Administrative Hearings, Florida Number: 89-002064 Latest Update: Nov. 14, 1989

Findings Of Fact Based on the oral and documentary evidence presented at the hearing, my observation of the witnesses and the entire record compiled herein, I make the following findings of fact: On November 17, 1988, Petitioner filed an application with Respondent, Department of Environmental Regulation (DER) for a permit to fill submerged areas waterward of the mean high water line abutting certain property Petitioner owns on Big Pine Key. Petitioner also proposed to place a riprap revetment over seagrass in the submerged area, and pilings for a stilted structure in the submerged areas. Petitioner purchased the lot in question on September 8, 1988. There is no habitable structure currently on the property and Petitioner wishes to build a cottage on the lot. The intended purpose of the filling is to enlarge the existing lot so that Petitioner will have adequate area to build a cottage upon, and to stop any erosion that might be occurring. The area to be filled is within the Florida Keys Special Waters, and is classified as Outstanding Florida Water by the Department of Environmental Regulation pursuant to Rule 17.3041(4)(b), Florida Administrative Code. The area is located within the National Key Deer Wildlife Refuge. The area proposed to be filled is further classified as Class III Waters. Although Petitioner contends that he is simply trying to reclaim a portion of his lot which has eroded, the evidence of erosion was very slight and only found in a small area where the property adjoins the vertical seawall of the adjacent property. This particular section is very different from the rest of the shoreline. There is not much vegetation in this area. Aerial photography taken of the property in 1959 and 1972 demonstrates that there has been not been a significant change in the size of the lot in the last thirty years. This conclusion is supported by the physical evidence at the property site. Petitioner has not affirmatively demonstrated that vegetative stabilization would not prevent any erosion that might be occurring. Along the shoreline of the area to be filled are buttonwoods and sea daisy and mangrove seedlings. The submerged area proposed to be filled is very diverse and productive. It includes seagrasses, several types of algae, several macroinvertibrates, and forage fish. The area to be filled is currently very healthy and there are no signs of heavy boat usage in the area. The algae that exists in the area proposed to be filled serves as a food source for fish, and as a helpful filter of floating particles. The dense, constant growth of seagrass in this area provides food for fish, stabilizes sediments, absorbs pollutants from the water, and provides shelter to fish. Any filling of this area would result in the direct elimination of dense, healthy seagrass beds. The proposed filling will result in a drop in the diversity of organisms existing in the filled area. This will cause a violation of the DER's standards for biological integrity. The proposed construction and filling is expected to violate the DER's Class III standards for turbidity. By directly eliminating an area of productive habitat, this project would adversely affect fish and other aquatic wildlife. The loss of the algae and seagrass vegetation will lead to a decrease in fishery production and marine productivity. The filling proposal does not include any measures designed to mitigate for or offset these expected adverse impacts. The residential structure proposed to be built over the fill is expected to cause additional adverse environmental impacts due to nutrient input from the residence.

Florida Laws (1) 120.57
# 2
LEISEY SHELLPIT, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION AND MANASOTA-88, INC., 86-000568 (1986)
Division of Administrative Hearings, Florida Number: 86-000568 Latest Update: May 11, 1987

Findings Of Fact Based upon the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Since 1915, the Leisey family has owned or controlled some 710 acres adjacent to Little Cockroach Bay in Hillsborough County. Leisey Shellpit, Inc. now proposes to develop some 55 acres of that property, which has in the past been utilized for row crops, citrus, timbering and mining. The proposed development is to include an 870-boat marina, of which approximately half would be dry storage, located on a 16-acre lake adjacent to the waters of Little Cockroach Bay. The 16-acre lake was created through shell mining operations, and other lakes are to be part of the total project. Leisey proposes to widen and deepen existing mosquito ditches and existing canals or channels to provide access from the proposed marina to Cockroach Bay and the open waters of Tampa Bay. Adjacent to the marina lake, the proposed development also includes a flushing channel, a 250-seat restaurant, a 24-unit resort hotel or motel, a museum, fueling facilities with upland gas storage, an 8-boat ramp launching area, a convenience store, a boat repair facility, a dockmaster's office and 688 parking spaces. The total development further includes a 114-unit apartment complex and 23 single-family residential lots on other lakes nearby the marina lake, a stormwater and agricultural runoff system and a sewage treatment plant. Leisey proposes to widen and convert an existing mosquito ditch between the marina lake and Little Cockroach Bay to a flushing channel in order to accomplish a tidal flushing action in the marina lake. In order to provide access for boats, Leisey proposes to widen and dredge two parallel existing mosquito ditches running southwesterly from the marina lake and an existing channel running east-west along Cockroach Bay Road and extending into the Cockroach Bay channel. These access channels will be dredged to provide a 50- foot wide bottom in most areas with a minus 6 N.O.S. elevation for the bottom of the channels. In areas which do not need dredging, there exists a gentle slope of 6:1. Where excavation is to occur, there will be a 3:1 slope. The total amount of dredging contemplated is 175,000 cubic feet. The majority of the spoil material will be pumped through a polyethelene pipe to the marina lake until that lake is contoured to desired elevations. Secondary spoil sites for any surplus materials are available in lakes owned or controlled by the Leisey family. Depending upon economic and environmental considerations, Leisey intends to use a combination of dredging methods, including suction dredging, dragline dredging, and use of a cutter head dredge. In order to control turbidity, petitioner will utilize earth barricades, silt screens and double silt screens depending upon the type of dredging performed in various locations. The shellpit which is proposed to become the marina lake is not a state water at this time. It will become a state water at the time it is connected to other state waters by the proposed access channels and flushing channel. It would be classified as a Class III water body. The Cockroach Bay Channel which Leisey proposes to widen and dredge has not been dredged in the past. The applicant was unable to predict the extent to which future maintenance dredging would be required if it is widened and deepened to provide access to the proposed marina. The water body areas adjacent to the proposed marina, particularly Cockroach Bay, are presently classified by the Department of Natural Resources as approved for shellfish harvesting, and have been so classified since at least 1975. However, since December 10, 1984, the area has been temporarily closed for shellfish, oyster, clam and mussel harvesting. When a marina is constructed, it is the policy of the Department of Natural Resources to reclassify the area within the marina proper as prohibited for shellfish harvesting and to establish a buffer zone outward from the marina which also would be prohibited for the harvesting of shellfish. The size of the buffer zone is dependent upon the quality, design, hydrography and usage of the marina. The DNR considers a worst-case scenario in terms of potential biological contamination when establishing the size of the buffer zone. In the case of the potential marina, the size of the buffer zone would be hundreds, thousands of yards. It is the policy of the DER to deny a request for a variance if the proposed project would result in DNR closing an area previously approved for shellfish harvesting. Waters approved for shellfish harvesting are classified by DER as Class II waters. Aquatic preserves are designated by the State for the preservation or enhancement of the biological, aesthetic and scientific values of those areas. The boundaries of the Cockroach Bay Aquatic Preserve are described by statute in Section 258.391, Florida Statutes, and such description also defines the boundaries of the Outstanding Florida Water (OFW) classification of the DER. Due to cost considerations, the applicant did not perform a mean high water line survey to demonstrate the proper boundaries of the Cockroach Bay Aquatic Preserve and the corresponding OFW boundaries. The statutory legal description of the Aquatic Preserve was derived from a lease given to the State by the Tampa Port Authority, to which the submerged lands in Hillsborough County had previously been dedicated. That description continuously makes reference to mean high water lines in Tampa Bay and the Little Manatee River. The applicant's professional land surveyor was of the opinion that the waters easterly of the islands offshore the proposed marina, including Little Cockroach Bay, are not a part of the Aquatic Preserve, and thus are not a part of the OFW designation. It was this witness's opinion that the only portion of the project to occur within the Aquatic Preserve is approximately 600 feet of the existing Cockroach Bay Channel to be dredged as an access channel. The DER's expert witness was of the opinion that the statutory legal description does include the waters of Little Cockroach Bay. The intervenors presented testimony that, at the time the description of the Preserve was developed, the Tampa Port Authority did not consider Little Cockroach Bay as a separate water body and intended it to be part of the Cockroach Bay Aquatic Preserve. The Preserve has been managed by the DNR as including the area of Little Cockroach Bay. The proposed marina lake is designed to be four feet deep at its edges and six feet deep In the central portion. An existing mosquito ditch is to be widened to provide a source of new water from Little Cockroach Bay on the incoming tide. At the conclusion of the flood tide, a computer-controlled gate will close, forcing water to exit through the access channels during the ebb tide. A flow directing wall will be installed for the purpose of promoting adequate water exchange in all portions of the marina. Petitioner's plans for the operation of the marina include a prohibition against live-aboards and a `no-head" policy. Fueling at the upland fuel pumps will be encouraged by a price differential. The upland fuel storage tanks are to be protected by barriers and earthen berms. The water side fueling facility is to be protected by a containment boom. In the event of a fuel spill, it is contemplated that the entire marina can be sealed off from outside waters by closing the flushing gates and by closing a turbidity curtain across the access channel. It is contemplated that a dockmaster or assistant will be on-site at the marina to ensure compliance with all rules and to handle any emergencies that may arise. In order to determine the viability of a given basin for use as a marina, it is appropriate to consider the flushing time or residence time -- the time necessary for water in a given system to exchange with waters in adjacent areas outside the system. In marinas that are tidally Influenced, flushing will, in large part, be a function of the tidal forcing. Utilizing a one-dimensional computer model, and assuming that no mixing occurs when water from the flushing channel enters the basin, the applicant predicts that the flushing or residence time of the basin will be approximately 4.2 days assuming a low tide, 5.6 days assuming a mid-tide volume, and 6.6 days assuming a high tide. If one were to assume a completely mixed system, the flushing time would be 8.6 days assuming a low tide, 11.4 days assuming a mid-tide volume, and 14 days assuming a high tide. Over a period of time, the tide level in the proposed basin will actually be represented by the range between high tide and low tide. Rather than assuming a low tide condition, it would be more accurate to use a tidally averaged or mid-tide volume of water. A no-mixing assumption does not take into account dead-water zones within a water basin. In reality, a marina would have some dead zones through the existence of the obstacle effect of objects such as boat hulls. Also, in this proposed marina, the area behind the deflection wall or flow directing wall would be outside the direct flow path and, thus, "dead" water. A one-dimensional model is typically utilized to predict the flushing times of narrow rivers or canals, as it represents tidal flow in only one direction in a straight line. A more appropriate model to utilize in a circular boat marina is a two-dimensional model. The tidal flushing of water bodies whose flow patterns are non-linear are more appropriately predicted by use of a two-dimensional model. The applicant failed to produce competent substantial evidence that the anti-fouling paints used on boats, as well as oils and greases typically produced by boats, would not violate Class III water quality standards in the marina lake and the access channels. It was also not demonstrated that Class III water standards for collform bacteria would be met. These factors are particularly important due to the potential for back flow which could cause marina waters to run back through the flushing canal into Little Cockroach Bay. Also, extreme weather events can force large volumes of water with high concentrations of contaminants out into Tampa Bay. While petitioner's water quality witnesses took samples and reviewed some of the available data base for the area dating back to 1950, the ambient water quality of Cockroach Bay for the period March 1, 1978, to March 1, 1979, was not established. The Hillsborough County Environmental Protection Commission did have monitoring stations in the vicinity of this project during 1978 and 1979. Also, while the petitioner's experts did consider the effects of dredging during construction, the effects of turbidity from future boat traffic were not established. There are currently existing water quality violations with respect to dissolved oxygen in the Class II and Class III waters associated with the proposed project. The more accelerated export of detridal material, as well as the introduction of oils and greases from boats, will cause increased DO violations. The resuspension of fine materials and sediments resulting from dredging and boat traffic in the channels could further lower oxygen demands. The widening and dredging of the access channels proposed by the petitioner will result in the immediate removal of approximately 0.3 acres of seagrasses and about 3.09 acres of mangroves. Most of the seagrass impacts would occur at the western mouth of the Cockroach Bay access channel. Many of the mangroves to be removed are mature, healthy fifteen to twenty- foot trees. Secondary losses of seagrasses and mangroves can be expected from the turbulance and erosion caused by wakes and from propeller damages associated with greatly increased boat traffic in the area. Petitioner proposes to mitigate these secondary losses by providing channel markers, speed limit signs and "no wake" signs in the channel. With respect to the immediate losses, petitioner proposes to replace the 0.3 acres of seagrasses with 0.3 acres of new plantings in the proposed flushing canal. It is suggested that the marina will naturally be vegetated by seagrasses. Petitioner also offers as mitigation for the loss of seagrasses in the dredged access channels the fact that over one acre of hard substrate in the form of pilings and seawalls will be constructed at the marina. It is suggested that this acre would become colonized by sessile attached animals, such as barnacles and oysters, and by red algae, and that this assemblage would become a source of primary productivity and provide a filtering benefit similar in function to grass beds. With respect to mangrove mitigation, petitioner intends to plant six-foot high mangrove trees along the perimeter of the proposed marina lake and along portions of the access channel, and to scrape down an area near the north lake to provide suitable elevations for mangroves and higher marsh vegetation. In total, petitioner plans to replace the 3.09 acres of lost mangroves with 4.25 acres of replanted mangroves. Approximately 80% of the seagrasses in Tampa Bay have been destroyed by development. A significant fraction of the remaining seagrasses are located in the Cockroach Bay area. Seagrass mitigation is highly experimental. No successful seagrass mitigation has occurred in Tampa Bay. The success of replanting seagrasses in the proposed flushing canal is particularly suspect due to scouring, flushing velocities and the potential for poor water quality in the event of a reverse flow from the marina into the flushing channel. The increased salinity in the marina lake could adversely affect seagrasses located there. Propeller cuts are already apparent in Cockroach Bay, as boaters cross the seagrass meadows in order to reach prime fishing areas. An increased amount of boat traffic in the area could be expected to exacerbate such occurences. While mangrove replantings have achieved more success, the areas to be destroyed are mature large systems which provide a considerable detridal feeding base for the animals associated with them, as well as cover for animals, fish and invertebrates that utilize those areas. Many of the types of animals and fish that utilize mangrove areas, as well as seagrass areas, are attached organisms that do not migrate. Mangroves require a stable substrate. The remaining mangrove system in the access channels could change with increased boat traffic, especially in those areas where the slopes are to be reduced to 3:1. The DER does not yet have a promulgated rule regarding mitigation. Its present policy is to evaluate mitigation plans on a case-by-case, site- specific basis. No specific ratio between the impacted area and the mitigated area is required. Instead, it is the policy of DER to analyze various factors, such as the present condition of the area being dredged or filled in terms of the age of the vegetation and the functions being served; proximity of the area to special areas such as Class II waters or an OFW; proximity between the areas impacted and the area planned for mitigation; and past examples of success of the mitigation proposed. DER considers mitigation in relationship to the public interest review standards, and does not consider mitigation when reviewing water quality standards. It is the present policy of the DER to either avoid adverse impacts to healthy seagrasses or to require a lot of" mitigation for those areas which will be lost if the project proceeds. This policy is due to the lack of demonstrated success in replanting or recreating new seagrass communities. While the planting and growing of mangroves has been more successful, it is the policy of the DER to recognize that there is a time lag between the planting and successful growing. When a large, healthy mangrove system is being destroyed and replaced by younger, smaller trees, DER generally requires more than a one- to-one ratio in mitigation. It is the policy of DER to consider the creation of a barnacle habitat as mitigation only when the dredging or filling project itself impacts that type of habitat. Petitioner conducted studies which led to the conclusion that the construction and operation of the proposed project would not reduce the biological integrity or diversity by more than 25 percent. However, given the removal of seagrass meadows and the adverse effects from greatly increased numbers of boats in the area, the applicant did not provide reasonable assurances that the biointegrity standards could be met. Manatees have been sited in Cockroach Bay and the Cockroach Bay boat channel. Due to its seagrasses and shallow waters, Cockroach Bay is one of the most important nursery areas for fish in Tampa Bay. Many wildlife species of special concern have been sited at or near the project site. These include the mangrove terrapin, the mangrove coocou, the brown pelican, the American alligator, the little blue heron, the snowy egret and the tri-colored heron. It is the policy of the DER, when considering the impact of a project upon fish and wildlife, to utilize all federal and state lists of endangered and threatened species. It is highly likely that increased boat traffic and human activity in the area will affect such wildlife. Several locations along the proposed north/south and east/west access channels could pose serious navigational difficulties due to restricted visibility. Given the potential number and sizes of boats in the access channels, manuevering problems can be expected, particularly during weekends. A boater must make a right angle turn where the north/south channel meets the east/west channel. A boat of 25 to 35 feet in length would have difficulty making such a turn in a fifty foot channel at speeds which would not produce a wake. If the vessel suffered engine failure or encountered other traffic at this turn, a hazardous navigational situation could arise. It would take a vessel approximately 20 to 30 minutes to travel at a safe speed from the marina to the mouth of the channel. It is common to observe boaters impatient to get into open waters or return home at the end of the day and navigating at speeds beyond that which is posted or in excess of that which is prudent or safe. Although not part of the application for variance or the instant permit application, petitioner offered evidence of its proposed stormwater management plan, sewage treatment plan, and agricultural runoff treatment plan. These plans are still conceptual in nature and would be the subject of future permitting requirements. Petitioner projects that these implemented plans will actually improve the water quality in the area of the project site. A porous concrete product is to be utilized for parking spaces and throughout the development except immediately adjacent to the marina. This product allows stormwater to pass through it and go into the groundwater, and it is designed to retain and break down oils and greases. Reversed sloping around the marina lake and access channels are to be used to prevent any direct discharge of stormwater. Flow is to be directed away from the marina through grasssed swales into retention ponds and into other isolated lakes. An advanced wastewater treatment plant, with a hyacinth treatment lake, is planned to provide sewage treatment for both this development and the surrounding communities, with an ultimate capacity of 250,000 gallons per day. The treated effluent, after going through the treatment lake will be directed into a rapid exfiltration trench to sheet flow into the mangroves. Petitioner also plans to redirect existing agricultural runoff, identified as being a present source of pollution to water in the area, so that it would go into several lakes and ultimately exit through rapid exfiltration trench sheet flow into the mangroves. In 1983, one of the greatest paleontological finds in this country occurred in one of the mine pits on the Leisey property. Over two hundred and fifty thousand specimens were obtained. Petitioner has entered into an agreement with the Florida State Museum whereby a museum will be constructed near the proposed marina, and displays from the paleontological discovery and other archeological exhibits from the Leisey property will be shown in an educational format. Petitioner has offered to dedicate the museum to the State. Should petitioner receive all permits required for construction of its proposed marina development, the Leisey family has offered to dedicate approximately 54 acres of mangrove lands near Little Cockroach Bay to the Tampa Port Authority or other appropriate entity for preservation purposes. There does appear to be a shortage of available marina spaces in Tampa Bay. However, there is a pending application before DER for an expansion of an existing marina in the vicinity, and other sites along the Bay would be of lesser conflict with existing seagrasses and mangrove systems. If petitioner's marina facility were constructed and operated as proposed, it would serve as a port of refuge to boaters during storms. Petitioner also proposes to reserve two of the eight boat ramp spaces for public safety and environmental agency personnel so that boats can be quickly launched and retrieved in emergency situations. The provision of an eight- space boat ramp and the 432 wet slips and 438-boat dry storage will increase public access to the off-shore waters. The proximity of the Tampa Ship Channel results in direct access to the Gulf of Mexico, and recreational activity will be enhanced by the project. In this proceeding, the burden to demonstrate that the proposed marina project complies with all applicable statutes, rules and policies of the DER and to provide reasonable assurances that the State's water quality standards will not be violated rests with the applicant, Leisey Shellpit, Inc. Due to the location of the proposed project, that burden is heavy and somewhat complicated. Surface waters in Florida are classified according to their present and future most beneficial uses, and water quality criteria have been developed to maintain the minimum conditions necessary to assure the suitability of the water for the designated uses. Section 403.061(10), Florida Statutes, and Rule 17-3.081, Florida Administrative Code. In addition, certain waters, due to their exceptional recreational or ecological significance, have been designated as Outstanding Florida Waters (OFW), with the intent that they be afforded the highest degree of protection. Section 403.061(27), Florida Statutes. A designation of a water body as an OFW is a determination that the environmental, social and economic benefits of the special protection outweigh the environmental, social and economic costs. Rule 17-3.041(:2)(f), Florida Administrative Code. The waters within and adjacent to the proposed project in this proceeding include OFW entitled to the highest protection, Class II waters with the designated use of "shellfish propagation or harvesting," and Class III waters with the designated use of "recreation, propagation and maintenance of a healthy, well-balanced population of fish and wildlife." Rule 17-3.081, Florida Administrative Code. As such, this project is subject to numerous statutory and regulatory requirements. The waters adjacent to the proposed marina, access channels and flushing channels are Class II waters. As such, Rule 17-4.28(8), Florida Administrative Code, governs requests to dredge and fill in those areas. That rule provides as follows: "(8)(a) The department recognizes the special value and importance of Class II waters to Florida's economy as existing or potential sites of commercial and recreational shellfish harvesting and as a nursery area for fish and shellfish. Therefore, it shall be the department's policy to deny applications for permits or certifications for dredging or filling activities in Class II waters, except where the applicant has submitted a plan of procedure which will adequately protect the project area and areas in the vicinity of the project from significant damage. The department shall not issue a permit for dredging or filling directly in areas approved for shellfish harvesting by the Department of Natural Resources. Provided, however, that the staff of the department may issue permits or certifications for maintenance dredging of existing navigational channels, for the construction of coastal protection structures and for the installation of transmission and distribution lines for carrying potable water, electricity or communication cables in rights-of-way previously used for such lines. (b) The department shall also deny applications for permits or certifications for dredging and/or filling activities in any class of waters where the proximity of such activities to Class II waters would be expected to have an impact on the Class II waters, and where reasonable assurance has not been provided that the activities will not result in violations of the applicable provisions of Chapter 17-3, Florida Administrative Code, in the Class II waters. Petitioner does not dispute that the waters are Class II waters. In spite of the fact that a variance from the rule was requested, petitioner contends that the prohibition against dredging in areas "approved for shellfish harvesting by the Department of Natural Resources" is not applicable here because the area is now temporarily closed to shellfish harvesting. In the alternative, petitioner contends that even if these waters are "approved" for shellfish harvesting, it is entitled to a permit to "maintenance dredge an existing navigational channel." This latter contention is without merit. There was no evidence that the access channels proposed to be widened and deepened had been previously dredged. Indeed, the evidence was to the contrary. Consequently, the proposed activity cannot be categorized as "maintenance dredging." Moreover, neither the proposed north/south access channel nor the proposed flushing channel are "existing navigational channels." Petitioner's argument with regard to a distinction between an area "approved" and an area "temporarily closed" to shellfish harvesting is initially logically appealing. However, the argument fails to recognize the purpose of the Class II designated use -- shellfish propagation or harvesting, as well as the DER policy to deny a request for a variance when a project would result in the permanent loss of an area for shellfish harvesting. It was undisputed that DNR establishes buffer zones around marinas within which shellfish harvesting is prohibited, and that the size of the buffer zone is dependent, in part, upon the size of the marina. The area "buffered" would be permanently, as opposed to temporarily, closed for shellfish harvesting. The DER's policy to deny permits or variance requests when the project would result in the permanent closure of a significant area for shellfish harvesting is supported by the remainder of Rule 17-4.28(8)(a), as well as by the purpose for the Class II designation. Thus, under the facts of this case, it is concluded that the prohibition against dredging and filling in areas "approved for shellfish harvesting by the Department of Natural Resources," as set forth In Rule 17- 4.28(8)(a), is applicable and that petitioner has failed to demonstrate entitlement to a variance from that prohibition. Even if petitioner were entitled to a variance, it has not provided reasonable assurances that the short and long term effects of the proposed activities will not violate water quality standards and public interest requirements so as to be entitled to a dredge and fill permit. As noted above, Outstanding Florida Waters are entitled to the highest degree of protection. An applicant for a permit to conduct activities which significantly degrade or are within such waters is required to affirmatively demonstrate that the activity meets the criteria set forth In Rule 17-4.242, Florida Administrative Code. Among those criteria are that the activities be "clearly in the public interest and that the "existing ambient water quality," within the OFW not be lowered as a result of the proposed activity. "Existing ambient water quality" is defined in Rule 17-4.242(1)(d) as the water quality which could reasonably be expected (based upon the best scientific information available) to have existed for the year prior to the OFW designation. The Cockroach Bay Aquatic Preserve was designated as an OFW on March 1, 1979. Rule 17-3.041, Florida Administrative Code. Therefore, the appropriate year for determining the "existing ambient water quality" of that OFW is from March 1, 1978, through March 1, 1979. Petitioner admits that at least 600 feet of the proposed east/west access channel is within the Cockroach Bay Aquatic Preserve. Since a mean high water survey was not conducted by the petitioner, or otherwise presented in this proceeding, the undersigned is unable to render a conclusion regarding the precise boundaries of the Aquatic Preserve or the coextensive OFW designation. It is persuasive that the DNR has managed the Preserve as though Little Cockroach Bay were included within it and that the Tampa Port Authority, from whom the lease to the State was derived, has not recognized Little Cockroach Bay as a separate water body. In any event, at least a portion of the proposed activity will be conducted within an OPW, and petitioner has failed to establish the ambient water quality of those waters for the relevant time period. As a result, petitioner has failed to meet its burden of affirmatively demonstrating that the proposed activity will not lower the quality of that water. While the petitioner did present evidence regarding the current condition of the waters and some historical data was reviewed, there was no affirmative demonstration of the quality of water which existed between March 1, 1978, and March 1, 1979. It simply was not established that petitioner relied upon the best scientific evidence available in its attempt to demonstrate that "existing ambient water quality" would not be lowered by the proposed activity. The operation of an 870-slip marina, along the public boat ramps, will generate a large amount of pollutants. Constant and heavy boat traffic within the marina lake and going in and cut of the area on a daily basis can be expected to continuously resuspend contaminants and pollutants. Given these factors, it was particularly incumbent upon the petitioner to make accurate predictions regarding flushing times, and to provide reasonable assurances that water quality standards would not be violated as a result of the proposed activity. The use of a one-dimensional model, along with the assumptions of no mixing and low tide conditions within the basin, does not provide adequate or accurate predictions with respect to the flushing or residence time of the proposed marina lake. The use of these flushing model computations to make water quality predictions for the lake and channels undermines those predictions. The applicant has failed to provide reasonable assurances that water quality standards, particularly with regard to dissolved oxygen, for Class II and III waters will not be violated on a short and long term basis. Without such assurances, and also considering the loss of healthy seagrasses and mangroves which will result from both dredging and continued boat traffic in the area, the proposed project Is not permittable. As stated In Rule 17- 3.011(5), Florida Administrative Code: Pollution which causes or contributes to new violations of water quality standards or to continuation of existing violations is harmful to the waters of this State and shall not be allowed. When an applicant is unable to meet water quality standards because the existing water quality does not meet standards, mitigation measures which cause net Improvement of the water quality may be considered. Section 403.918(2)(b), Florida Statutes. In mitigation, the petitioner has offered its plans for stormwater management, agricultural run-off and sewage treatment to demonstrate that water quality conditions will be improved by the overall development contemplated. Without a reasonably accurate prediction of the extent to which the proposed project and related activities will cause or contribute to existing DO violations, as well as other violations, in the subject waters, It is impossible to determine whether these mitigation measures will cause a net Improvement of the water quality in the area. In addition, the plans for the proposed stormwater management, agricultural runoff and sewage treatment systems were conceptual in nature. Until more detailed plans are developed, it is impossible to determine whether future permit applications for those projects would be acceptable. The petitioner's mitigation plans for the removal of seagrasses and mangroves is likewise unacceptable. Attempts to replant seagrasses, especially in Tampa Bay, have not been successful and are in an experimental stage. Petitioner's proposed 1:1 mitigation ratio is not appropriate for seagrasses due to the possible failure of its attempts, the proposed location of the replantings, and the expectation of secondary losses from boat traffic, erosion and potential future maintenance dredging. While the replanting of mangroves have a past record of success, a larger than 1:1 ratio would be appropriate to account for the difference in functions between a healthy system of large trees and the replanting of smaller trees, to account for the secondary losses which may be expected from greatly increased boat traffic and to account for the difference in locations between the trees to be removed and the trees to be replanted. An applicant must also provide reasonable assurances that the proposed project is "not contrary to the public Interest" or, in the case of the presence of Outstanding Florida Waters, that the project will be "clearly in the public interest." In making public interest determinations, the Legislature has set forth seven criteria to be considered and balanced, and has allowed applicants to offer measures to mitigate adverse effects. Section 403.918(2), Florida Statutes. The seven factors are: Whether the project will adversely affect the public health, safety, or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of 5.267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. In order to demonstrate that its Mangrove Bay Marina proposal is not contrary to and is clearly in the public interest, petitioner offers its mitigation plans previously discussed with regard to seagrasses, mangroves, stormwater, agricultural runoff and sewage treatment. It is contended that these features of the total project, along with the provision of a secure and well-policed facility, will have a beneficial effect upon public health, safety and welfare and will conserve fish and wildlife and their habitat. It is also urged that its well- marked and maintained channels will Improve navigation and not contribute to harmful shoaling or erosion and will provide for an adequate flow of water. Safe mooring, boat storage and public boat ramps will enhance fishing and recreational values, and marine productivity will not be adversely affected, according to the applicant. Finally, the petitioner offers its museum with educational programs to demonstrate enhancement to significant historical and archaeological resources. There can be no doubt that the applicant has attempted to develop a proposal which will satisfy environmental, as well as social, concerns. It is also true that the marina project would satisfy the need for additional boat slips In the Tampa Bay area. The prime problem is the location of the proposed project. The Cockroach Bay and Little Cockroach Bay areas are relatively undisturbed by development. The area is Important as a research area and as a nursery area for juvenile fish and shellfish. The designation of waters adjacent to and within the proposed project site as Outstanding Florida Waters and Class II waters establishes their importance and govern the manner in which activities therein are to be evaluated. The applicant has failed to provide reasonable assurances that the project complies with water quality criteria and public Interest considerations applicable to these wetlands. The long and short term adverse environmental impacts upon water quality, seagrasses and mangroves are sufficient to justify a denial of the permit application. Those considerations, coupled with the disruption of wildlife habitat, the hazardous design of the marina channels, the destruction of a highly productive aquatic system without appropriate mitigation, and the potential of harming manatees, far outweigh any positive benefits of the project. The paleontology museum, while serving a laudable educational function, will not serve as mitigation for any estuarine loss and the historical and archaeological resources to be considered under Section 403.918(2)(a)6, Florida Statutes, refer to historic properties representing more than 10,000 years of human presence. In short, while the project may provide some advantages with regard to recreation and public safety, its adverse effects upon fish, wildlife, harmful erosion and shoaling, marine productivity and the present condition and value of the functions being performed in the area are contrary to the public interest. Petitioner has failed to demonstrate any overriding public interest that would outweigh these considerations. As a final matter, it was stipulated that Manasota-88, Inc., the Florida Audubon Society, Eagle Audubon Society and Tampa Audubon Society had standing to participate as intervenors in this proceeding. Petitioner's motion in opposition to the intervention status of the Tampa Bay Regional Planning Council was initially denied, subject to that organization presenting proof of its standing at the hearing. The Council failed to produce such proof, and its petition to intervene is accordingly denied.

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the requests of Leisey Shellpit, Inc. for a variance and a permit and certification to construct and operate the Mangrove Bay Marina and attendant access and flushing channels be DENIED. Respectfully submitted and entered this 11th day of May, 1987, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NO. 86-0568, 86-0569 The proposed findings of fact submitted by the parties have been carefully considered and have been accepted and/or incorporated in this Recommended Order, except as noted below: Petitioner Leisey: 6, last two sentences Rejected; not supported by competent, substantial evidence. 7, last two sentences Rejected; not supported by competent, substantial evidence. 8, last sentence Rejected; contrary to the greater weight of the evidence. 9, last sentence Rejected; the evidence. demonstrates that the words "temporarily closed" should be substituted for "not approved." 11, last sentence Rejected; contrary to the greater weight of the evidence. 14, last sentence Rejected; not supported by competent, substantial evidence. 18, last sentence Rejected; not supported by the greater weight of the evidence. 19, last two sentences Rejected; contrary to the greater weight of the evidence. 20, last sentence Rejected; not supported by competent, substantial evidence. 21, last three sentences Rejected; not supported by competent, substantial evidence as to "existing ambient water quality. 23, last three sentences Rejected; not established by competent, substantial evidence. 24, last sentence Rejected; not established by competent, substantial evidence. 25, last sentence Rejected; contrary to the greater weight of the evidence. 28, last sentence Rejected; not established by competent, substantial evidence. 30 - 33 Accepted, with a recognition that the plans are conceptual in nature, and not detailed as required for permitting purposes. 35, last sentence Rejected; not established by competent, substantial evidence. 43, third sentence Rejected; not established by competent, substantial evidence. Respondent, DER: 2 Rejected; irrelevant and immaterial. 16, first sentence Rejected as to the words "will occur," as opposed to "could occur." 70 Rejected; insufficient evidence was adduced to render a finding regarding the precise OFW boundaries. 76 Rejected; irrelevant and immaterial. 85 Rejected as to the specifics of the permitability of other sites, as not established by competent, substantial evidence. 94, last sentence Rejected as speculative. 96 Rejected; not supported by competent, substantial evidence. 99 Rejected, irrelevant and immaterial. 102 Rejected, as speculative. 113 Rejected, not supported by competent, substantial evidence. Intervenor Manasota-88: This party's post-hearing submittal contains mixed proposed findings of fact and conclusions of law. The proposed factual findings are generally accepted and have been addressed in the Recommended Order. COPIES FURNISHED: Robert A. Routa, Esquire Robert, Egan & Routa, P.A. Post Office Box 1386 Tallahassee, Florida 32302 C. Anthony Cleveland, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Thomas W. Reese, Esquire 123 Eighth Street North St. Petersburg, Florida 33701 Robert S. Tucker, Esquire Linda M. Hallas, Esquire 9455 Koger Blvd., Suite 209 St. Petersburg, Florida 33702 M. Charles Lee Senior Vice President Florida Audubon Society 1101 Audubon Way Maitland, Florida 32751 Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 258.391403.061403.412
# 3
BRENDA B. SHERIDAN vs DEEP LAGOON MARINA, A/K/A DEEP LAGOON BOAT CLUB, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-002234 (1999)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida May 18, 1999 Number: 99-002234 Latest Update: Mar. 08, 2000

The Issue The issues in this case are whether the Department of Environmental Protection (DEP) should modify the conditions of permits held by the Deep Lagoon Boat Club, Ltd., d/b/a Deep Lagoon Marina (Applicant), to allow Applicant to construct and operate a boat travel lift in a new location at the marina and to substitute a 60-foot wide flushing channel required by the prior permits with two-48 inches box culverts.

Findings Of Fact Applicant owns and operates Deep Lagoon Marina (the Marina). The Marina comprises uplands and three canals adjoining MacGregor Boulevard south of downtown Fort Myers. The Marina presently consists of 61 wet slips, 200 dry slips, and other marina-related buildings. The Marina is on Deep Lagoon, a Class III surface water body less than one-half mile from the Caloosahatchee River. Deep Lagoon is a short, largely mangrove- lined waterway that runs north into the Caloosahatchee River. The Caloosahatchee River runs west from Lake Okeechobee past Fort Myers to the Gulf of Mexico. One of Applicant's predecessors in interest dredged the three canals in the 1950s or 1960s, and a marina has existed at this location since that time. As a result of a purchase in 1997, Applicant owns at least the uplands and claims ownership of the submerged bottoms of the canals. The parties have stipulated that ownership of the submerged bottoms of the canals is not being litigated or decided in this proceeding and that, subject to the issue's being decided adverse to the Applicant in other proceedings, sufficient ownership is presumed for purposes of this proceeding. From north to south, the Marina comprises the north canal, which is about 1200 feet long and bounded on the north by a red mangrove fringe 10-20 feet wide; a peninsula; the central canal, which is also known as the central or main basin and is roughly the same length as the north canal; a shorter peninsula; and the south canal, which is about half the length of the central canal and turns to the southeast at a 45-degree angle from the midway point of the central canal. The three canals are dead-end canals, terminating at their eastern ends a short distance from MacGregor Boulevard. Petitioner, Brenda Sheridan, resides at 842 Cal Cove Drive, Fort Myers, Florida, which is on the shores of the Caloosahatchee River at Deep Lagoon, just across the south canal from the Marina. Intervenor, Save the Manatee Club (STMC), is a non- profit Florida corporation with approximately 40,000 members. The organization's stated purpose includes protecting the manatee and its habitat through public awareness efforts, research support and advocacy, which activities benefit manatees, STMC, and its members. The Florida Legislature has recognized STMC's substantial interest in manatee protection by designating it a member of the manatee protection committee provided by the Florida Manatee Sanctuary Act at paragraph 370.12(2)(p), Florida Statutes, and by requiring the state to solicit recommendations from STMC regarding the use of Save the Manatee Trust Fund monies, at Section 370.12(5)(a), Florida Statutes. Numerous members of STMC reside within Lee County, where they observe, study, photograph, and actively attempt to protect manatees from collisions with watercraft. These efforts benefit manatees and provide STMC's members with educational and recreational benefits in the waters of Lee County that would be affected by the proposed activity. STMC has expended substantial resources in advocating increased legal protection of manatees in Lee County, including additional boat speed regulations on the Caloosahatchee River. STMC has also constributed funds for the rescue and rehabilitation of manatees exposed to red tide in Lee County waters. Injury, mortality, and loss of important habitat would produce significant, adverse impacts to the manatee, thereby diminishing the ability of STMC's members to observe, study, and enjoy manatees in waters that would be affected by the proposed activity and frustrating STMC's efforts to preserve and protect manatees in Lee County. Permit History On December 9, 1986,, Applicant's predecessor in title applied to DEP's predecessor agency, the Department of Environmental Regulation (DER), for a dredge and fill permit to rehabilitate the 61 existing wet slips at the Marina and add 113 new wet slips. Because Deep Lagoon violated Class III water quality standards, and there was concern for the West Indian manatee, a listed endangered species which uses the waters in and around Deep Lagoon, DER placed conditions on the permit and gave notice of intent to grant the permit, with conditions, on July 26, 1988. Petitioner and others challenged the issuance of the permit, and formal administrative proceedings were conducted, culminating in a final order on August 24, 1989, approving the permit, with additional conditions, and certifying under the federal Clean Water Act that state water quality standards were met because there would be a net improvement in water quality of the poorly-flushed canals. Sheridan, et al. v. Deep Lagoon Marina and Dept. of Environmental Reg., 11 F.A.L.R. 4710 (DER 1989). Wetland Resource Permit 361279929, incorporating all of the conditions, was issued on September 22, 1989, for construction and operation of the project for five years (the 1989 Permit). Petitioner and the others appealed the final order. In Sheridan v. Deep Lagoon Marina, 576 So. 2d 771, 772 (Fla. 1st DCA 1991), the court, relying on the 1987 water quality data, noted the "very poor water quality" of Deep Lagoon, as reflected in part by the presence of oil and grease 20 times the Class III standard, copper 13 times the standard, lead 20 times the standard, mercury 1000 times the standard, and coliform bacteria "too numerous to count." However, the court affirmed the issuance of the 1989 Permit under the statutory authorization of a permit where ambient water quality does not meet applicable standards, but the activity will provide a net improvement to the waters. On the certification issue, though, the court reversed and remanded. The court held that the hearing officer erroneously excluded evidence on DER's certification of the activity as in compliance the federal Clean Water Act. Following proceedings on remand, DER entered Final Order on Remand on April 10, 1992, which revoked the earlier certification of compliance and, citing 33 United States Code Section 1341, as authority, waived certification as a precondition to federal permitting. Sheridan, et al. v. Deep Lagoon Marina and Dept. of Environmental Reg., 14 F.A.L.R. 2187 (DER 1992). The 1989 Permit expired on September 22, 1994, but Environmental Resource Permit 362504599 was issued on October 9, 1995, essentially extending the 1989 Permit conditions for ten years, to October 9, 2005. Minor modifications were approved on November 17, 1995, March 26, 1997, and April 15, 1997. Environmental Resource Permit 362504599, with all conditions and subsequent modifications, is referred to as the 1995 Permit. Permit Conditions In general, the 1995 Permit authorizes the owner of the Marina: to renovate and expand an existing marina from 61 wet slips to 174 wet slips by: excavating 0.358 ac of uplands to create a flushing canal, installing 375 linear feet of seawall along the sides of the flushing canal, excavating 2.43 ac of submerged bottom to remove contaminated sediments, backfilling 2.41 acres of the dredged area (the main basin and south canal to -7 ft. MLW and the north canal to -6 ft. MLW) with clean sand, renovating the existing 61 slips, and constructing an additional 14,440 square feet of overwater decking for 113 new slips, providing after-the-fact authorization for construction of 2 finger piers, creating a 400 sq. ft. mangrove fringe, constructing 180 linear feet of seawall in the vicinity of the mangrove fringe, and relocating and upgrading fueling facilities. The 1995 Permit authorized activities to proceed in three phases: First, the majority of the water quality improvement measures will be implemented as required in Specific Condition 5. Second, the over water docking structures will be constructed and the fueling facilities will be upgraded and relocated as required in Specific Conditions 6 and 7. Third, the new slips will be occupied in accordance with the phasing plan in Specific Condition 9. Specific Condition 5 imposed several requirements designed "to ensure a net improvement in water quality." Among them, Specific Condition 5 stated in pertinent part: In order to ensure a net improvement to water quality within the basin, the construction of any new docking structures or installation of any new pilings shall not occur until the below-listed conditions (A-K) have been met. . . . A baseline water quality study . . .. A stormwater treatment system providing treatment meeting the specifications of Florida Administrative Code 40E-4 for all discharges into the basins from the project site shall be constructed. . . . The boat wash area shall be re-designed and constructed as shown on Sheets 23 and 23A. All water in the washdown area shall drain into the catch basin of the wastewater treatment system shown on Sheet 23. The water passing through the wastewater treatment system shall drain to the stormwater management system which was previously approved by the South Florida Water Management District. The filters of the wastewater treatment system shall be maintained in functional condition. Material cleaned from the filter shall be disposed of in receptacles maintained specifically for that purpose and taken to a sanitary landfill. This system shall be maintained in functional condition for the life of the facility. Contaminated sediments shall be dredged from the areas shown on Sheets 5 and 7 of 23. A closed-bucket clam shell dredge shall be used. The north canal shall be dredged to at least -9.9 feet MLW and backfilled with clean sand to -6 feet MLW. The [main] basin shall be dredged to at least -7.3 feet MLW and backfilled with clean sand to -7 feet MLW. The south canal shall be dredged to at least -10.5 feet MLW and backfilled with clean sand to at least -7.0 feet MLW. Backfilling shall be completed within 120 days of completion of dredging. . . . The sediments shall be placed directly in sealed trucks, and removed to a self-contained upland disposal site which does not have a point of discharge to waters of the state. A channel, 260 ft. long, 60 ft. wide, with a bottom elevation of -4.5 ft. MLW shall be excavated between the north canal and the main basin to improve flushing. * * * K. Upon completion [of] conditions A-J above, renovation of the existing 61 wet slips and construction of the 113 additional wet slips may proceed with the understanding that construction of all 113 additional slips is at the risk of the permittee and that if the success criteria in the monitoring and occupancy program are not met, removal of all or part of the additional slips may be required by the Department. Specific Condition 8 addressed the phasing of occupancy of the wet slips. Specific Condition 8 provided in pertinent part: Occupancy of the additional 113 wet slips shall occur in two phases, described below. Permanent occupancy of the slips shall require [DEP] approval, contingent upon the water quality monitoring program demonstrating a statistically significant (Specific Condition 9) net improvement for those parameters which did not meet State Water Quality Standards in the baseline study. The permittee agrees that if [DEP] determines that net improvement has not occurred, or if violations of other standards occur, and if the corrective measures described in Specific Condition 10 are not successful, all of the additional slips occupied at that time shall be removed. . . . Phase I--Upon completion of the baseline water quality study and the work specified in Specific Condition No. 5, the existing 61 slips and an additional 56 slips, totalling 117 slips, may be occupied. . . . If at the end of one year of monitoring, the data generated from the water quality monitoring program shows a statistically significant improvement over baseline conditions, for those parameters in violation of State Water Quality Standards, and no violations of additional parameters, . . . the new 56 slips which were occupied shall be considered permanent. Phase II--Upon written notification from [DEP] that Phase I was successful, the remaining 57 additional slips may be occupied. Water and sediment quality monitoring shall continue for two years after the occupancy of 140 of the 174 slips. If a statistically significant net improvement to water quality over baseline conditions for those parameters in violation of State Water Quality Standards [sic] and no violation of additional parameters is shown by the monitoring data, and confirmed by [DEP] in writing, the additional slips shall be considered permanent. Specific Condition 11 added: Implementation of the slip phasing plan described in Specific Condition 8 shall be contingent on compliance of boaters with existing speed zones in the Caloosahatchee River and trends in manatee and [sic] mortality. . . . Approval of additional slips will depend upon manatee mortality trends and boater compliance with speed zones in the Caloosahatchee River and additional slips may not be recommended. . . . Based on the results of the evaluations of Phases I and II, [DEP] may require that slips be removed to adequately protect manatees. Specific Condition 12 required the construction of a 400 square-foot intertidal area for the planting of mangroves to replace the mangroves lost in the construction of the flushing channel. Specific Condition 14 prohibited live-aboards at the marina. Specific Condition 15 added various manatee-protection provisions. Applicant's DOAH Case Nos. 98-3901 and 98-5409 Seeking to satisfy certain of the requirements of Specific Condition 5 of the 1995 Permit, Applicant filed with DEP, on December 10, 1997, an application for an Environmental Resource Permit (ERP) and water quality certification to construct a surface water management system to serve 15.4 acres of its 24-acre marina. On March 3, 1998, Applicant's engineering consultant submitted drawings to DEP with notification that Applicant intended to "maintenance dredge the internal canals of Deep Lagoon Marina," in conformity with Rule 62-312.050(e), Florida Administrative Code. The letter described the proposed dredging as mechanical "with no discharge back into Waters of the State." The letter assured that Applicant's contractor would use turbidity curtains "around the dredging and spoil unloading operation" and advised that the contractor would unload the spoil "to the north peninsula upland area." The letter stated that the dredging would "be to the design depth/existing canal center line depth of -7 NGVD," which was established by the 1995 Permit, and would be "done in conjunction with the required dredging under [1995 Permit] Condition 5(D)." The consultant attached to the March 3 letter several drawings showing the dredging of all three canals. For each canal, the drawings divided the dredging into two areas. (For 1.82 acres, the contractor would dredge contaminated materials from the dead-ends of the three canals and then replace these materials with clean backfill material, as already authorized in the 1995 Permit.) For 4.84 acres, which ran through the remainder of the three canals, the contractor would maintenance dredge in accordance with the cross-sections provided with the letter. By letter dated March 13, 1998, DEP stated its determination that, pursuant to Rule 40E-4.051(2)(a), Florida Administrative Code, the proposed activity was exempt from the requirement to obtain an ERP. The letter warned that, pursuant to Chapter 62-302, Florida Administrative Code, the construction and operation of the project must not cause water quality violations. The letter added that DEP could revoke its determination of exemption if the "basis for the exemption is determined to be materially incorrect, or if the installation results in water quality violations." The letter provided a point of entry for persons whose substantial interests are affected by DEP's determination. Petitioner challenged the exempt status of the maintenance dredging, and STMC intervened in support of the challenge, which was referred to DOAH and given DOAH Case No. 98-3901. But Applicant's contractor proceeded during the pendency of the challenges and completed the maintenance dredging in the three canals. (Applicant's contractor also performed the contaminant dredging and clean backfilling authorized by the 1995 Permit.) On November 5, 1998, DEP gave notice of intent to issue the ERP for the surface water management system and certify compliance with state water quality standards, pursuant to Section 401 of the Clean Water Act, 33 United States Code, Section 1341. Petitioner filed a challenge on December 8, 1998, and the matter was referred to DOAH, where it was given DOAH Case No. 98-5409. On February 6, 1999, DEP revised the notice of intent by withdrawing its certification of state water quality compliance. As it did with the 1989 Permit, DEP again waived state water quality certification, consistent with a letter dated February 2, 1998, in which then-DEP Secretary Virginia Wetherell announced that DEP would waive state water quality certification for all activities in which the agency issues an ERP based on the "net improvement" provisions of Section 373.414(1)(b), Florida Statutes. DOAH Case Nos. 98-3901 and 98-5409 were pending when Applicant sought the modifications to the conditions of the 1995 Permit which are the subject of this case (DOAH Case No. 99- 2234). DOAH Case Nos. 98-3901 and 98-5409 were consolidated and heard by Administrative Law Judge (ALJ) Robert E. Meale on February 11 and May 3-4, 1999. On November 24, 1999, ALJ Meale entered a Recommended Order recommending a final order revoking DEP's determination of an exemption for maintenance dredging in DOAH Case No. 98-3901 and denying the ERP in DOAH Case No. 98- 5409. The recommendation to deny the ERP in DOAH Case No. 98- 5409 was based on findings and conclusions: (1) that Applicant had not provided reasonable assurances that the construction and operation of the proposed surface water management system would result in a "net improvement" in water quality; and (2) that the direct and secondary impacts of the construction and operation of the system would adversely affect the West Indian manatee. Water Quality As indicated in relating the permitting history of this site, water quality in the waters of the Marina has been poor. See Findings 10 and 12, supra. ALJ Meale recently found in his Recommended Order on Case Nos. 98-3901 and 98-5409 as follows: The Caloosahatchee River is laden with sediments, partly due to intermittent discharges from Lake Okeechobee. Seagrass in the riverbottom cannot grow in water much deeper than four feet. Some seagrass grows at the mouth of Deep Lagoon, but little seagrass extends into the lagoon itself. The water quality in the canals is very poor for dissolved oxygen and copper. Applicant stipulated that the water quality in Deep Lagoon violates state standards for dissolved oxygen, copper, and coliform bacteria. In 1997, the canals violated water quality standards for dissolved oxygen nearly each time sampled during the wet season and one-third of the times sampled during the dry season. The dissolved oxygen levels violated even the lower standards for Class IV agricultural waters two-thirds of the times sampled during the wet season. In 1997, the canals violated water quality standards for copper in the water column each time sampled during the wet season and two-thirds of the times sampled during the dry season. During three of the dry season samplings, copper levels were 20 to 30 times lawful limits. The three lowest wet season copper levels were double lawful limits. Copper is a heavy metal that is toxic to a wide range of marine organisms. Copper is applied to boat hulls to prevent marine life from attaching to the hulls. In 1997, the canals violated water quality standards for total coliform bacteria (for any single reading) three of the 60 times sampled during the dry season and one of the 56 times sampled during the wet season. The canals violated the more relaxed, 20-percent standard (which is violated only if 20 percent of the readings exceed it) during the wet season, but not during the dry season. In 1997, the canals violated water quality standards for lead in the water column in one sample (by 25 percent) out of 36, but did not violate water quality standards for oil and grease or fecal coliform bacteria. Results of testing for mercury in the water column (as opposed to sediments) are not contained in the record. As compared to 1987, the water quality in the canals has improved in all but one important respect. In 1987, the water column readings for copper were five to six times higher than the highest 1997 reading. In 1987, the total coliform bacteria were too numerous to count because the colonies had grown together in the sample. However, comparing the April 1987 data with the May 1997 data for the same approximate times of day and the same locations, the dissolved oxygen levels in the three canals have declined dramatically in the last 10 years. Ten years ago, in a one- day sampling period, there were no reported violations; ten years later, in a one-day sampling period, there were four violations. Even worse, the amount of dissolved oxygen in the water during daylight hours has been halved in the last 10 years with a smaller decrease during nighttime hours. In this case, the parties stipulated that the waters of Deep Lagoon and the Marina are Class III marine waters that do not meet Florida water quality standards for dissolved oxygen, copper, and total coliform bacteria. They also stipulated that there were violations in 1987 for oil and greases (20 times standard), fecal coliform (too numerous to count), lead (20 times standard), cadmium (ten times standard), mercury (1,000 times standard), biological diversity, and tributytin (150 times standard) (although DEP and Applicant do not think the 1987 data are relevant). Data collected in 1987 showed average flushing time in the north canal to be 183 hours (tidal prism method), 90.5 hours (current velocity), and 50 hours (dye concentration reduction method). Data collected in 1987 showed average flushing time in the main basin to be 208 hours (tidal prism method), 48 hours (current velocity), and 154 hours (dye concentration reduction method). Manatees The parties stipulated that Lee County is a heavy use area for the West Indian Manatee and that manatees use the water south of Deep Lagoon and the Caloosahatchee River on a year-round basis. ALJ Meale recently found in his Recommended Order on Case Nos. 98-3901 and 98-5409 as follows: The Caloosahatchee River is critical habitat for the endangered West Indian manatee. Up to 500 manatees use the river during the winter. When, during the winter, the water cools, the animals congregate in waters warmed by the thermal discharge from a power plant about 13 miles upstream of Deep Lagoon. When, during the winter, the water warms, the manatees swim downstream, past and into Deep Lagoon searching for food. Manatees frequently visit Deep Lagoon. It is one of the few places between the power plant and the Gulf where manatees can find a quiet place, relatively free of human disturbance, to rest and feed. Within Deep Lagoon, the Iona Drainage District ditch runs parallel to the north canal, separated from the canal by the previously described mangrove fringe. The Iona Drainage District ditch empties into Deep Lagoon just north of the mouth of the north canal. Manatees frequently visit the ditch because it is a seasonal source of freshwater, which the manatees drink. Manatees visit the north canal due to its moderate depths and proximity to the freshwater outfalls of the Iona Drainage District ditch. Manatee mortality from watercraft is extremely high in the immediate vicinity of Deep Lagoon, and the mortality rate has increased in recent years. The rate of manatee deaths from collisions with watercraft has increased with the popularity of motorboating. Boat registrations in Lee County rose from 13,000 in 1974 to 36,000 in 1997. The potential for mitigation offered by the enactment of speed zones has been undermined by the fact that nearly half of the boaters fail to comply with the speed limits. It is clear that manatees frequent Deep Lagoon near the mouth of the north canal. There are seagrass beds there to serve as a food source, and freshwater from the Iona Drainage District ditch discharges in that area. The evidence in this case includes testimony and numerous photographs of manatees not only in that vicinity but up to 200 feet into the north canal. While there are no seagrass beds in the north canal itself, freshwater from the Iona Drainage District ditch discharges into the north canal all along the length of mangrove fringe on the north shore of the canal. It is not clear how much further up the north canal manatees go, but they probably frequently continue further into the north canal since one primary attraction of the north canal for manatees at this time is its relative quiet and peacefulness. Manatees also make some use of the central and south canals of the Marina, but they seem to prefer the north canal for its peacefulness and for the fresh water supply from the Iona Drainage District ditch. The Florida Department of Transportation recently has constructed a retention pond for MacGregor Boulevard in the vicinity of the Marina which will discharge fresh water into the main basin of the central canal. This may make the central canal more attractive to manatees than it is at this time, notwithstanding the relatively high level of boating-related activity there. New Boat Travel Lift The Marina's existing boat travel lift is located in the main basin of the central canal. There also are the remnants of an older travel lift operation at the western end of the central peninsula extending into Deep Lagoon. Applicant proposes to construct and use a new boat travel lift at the eastern terminus of the north canal. The proposed location of the new travel lift will be closer to the approved location of a new service center building. A travel lift essentially consists of a heavy-duty, U-shaped frame which is built on wheels and motorized for mobility. Heavy-duty straps are suspended from the frame using pulley systems. The travel lift is driven out over water on specially-built tracks so the straps can be placed underneath large vessels (over 40 feet) and tightened using the pulleys to secure the vessels; the travel lift is then driven off the tracks, and the vessels are transported to a dry storage or repair location, where the vessels are lowered, and the straps are removed. The process essentially is reversed to return vessels to the water. The direct impact of construction of the new boat travel lift involves removal of some mangroves existing at the terminus of the north canal and sinking pilings to support the tracks extending into the water on which the travel lift operates. Applicant proposes to mitigate the mangrove impacts by filling areas on either side of the proposed travel lift to just above the mean-high waterline and planting the areas with mangroves. Not only will this be a net increase the amount of mangrove fringe, the decrease in water depth at the east end of the north canal also will improve flushing of the canal to some extent. Applicant also proposes to remove exotic plants all along the shoreline of the Marina's canals for the life of the Marina. It is the Marina's intent to use the travel lift only for vessels too large to be lifted by forklifts operated at the main basin of the central canal. The Marina is purchasing new, larger (37,000 pound) forklifts (compared to the 10,000 pound forklifts currently in use), which can lift vessels up to approximately 42 feet long. Use of the larger forklifts will reduce the use of the travel lift. At this time, there is no proposed specific condition to limit use to the travel lift to vessels too large to be lifted by the new forklifts. New Specific Condition 33 in the proposed permit modifications provides: "Launching of vessels from the dry storage facilities shall be prohibited in the north canal at the site." New Specific Condition 34 in the proposed permit modifications provides in part: "Launching and retrieval of vessels in the north canal shall be restricted to vessels stored/moored at the marina facility that require boat repair." New Specific Condition 34 also would require Applicant to maintain logs for the travel lift and boat repairs to allow DEP to verify compliance by comparing the two logs. There was some disagreement as to the intent of the quoted proposed new specific conditions. A DEP witness thought it meant that the Marina only could use the travel lift for repair of vessels permanently moored at the Marina, but the Marina's representative did not think the language would prohibit the repair of other vessels as well. Assuming that vessels not permanently moored at the Marina will be accepted for repairs, and that only vessels too large for the new forklifts will use the new travel lift, it can be anticipated that an average of 6-10 vessels a week will use the travel lift for retrieval from the water and discharge back to the water. To some extent, use of the travel lift is limited by the average time it takes to use the lift. But considering only those limitations, it is possible use the lift as many as 19 times in a day in an emergency--e.g., when a hurricane is approaching, and the Marina is trying to get as many boats out of the water as possible. On average, use of the travel lift also will be limited by market conditions and the capacity of the new service center to store and repair large vessels. More than half of the average use of 6-10 vessels a week probably will occur on Fridays (for repairs before peak weekend boating) and Mondays (for repairs after the weekend peak). At this time, there is no proposed specific condition to limit use of the new travel lift. But at final hearing, the Marina expressed its willingness to accept a limit of an average of ten vessels a week. (Counting retrieval from the water and discharge back to the water for each vessel, the agreed limit would be an average of 20 uses of the travel lift a week). The Marina was not willing to accept a daily limit. Secondary impacts from such a limited use of the proposed new travel lift on water quality and manatees are difficult to assess precisely. The travel lift itself uses some form of lubrication, but only the straps enter the water during operation. Historically, vessels have been pressure-washed and had their bilges and engines flushed while on the existing travel lift in the main basin of the central canal at the Marina, and wash-water from these operations has entered the main basin at that location. Wash-water from such operations at the proposed new travel lift location would enter the north canal, subject to the construction and operation of an adequate surface water management system, as required by Specific Condition 5.C. of the 1995 Permit. Cf. DOAH Case No. 98-5409, supra. It is possible that vessels in need of repair entering the north canal and proceeding to the proposed new travel lift location (whether under power or being towed) could leak oil or gasoline. Both contaminants would rise to the surface. Leaked gasoline and the more volatile components of oil could be expected to evaporate relatively quickly; the residue of oil contamination would be persistent. Such spills would affect water quality and could affect manatees drinking fresher water from the surface of the north canal. There was no evidence from which to predict or quantify such impacts. It would be possible for manatees to be injured by vessels using the proposed new travel lift. Although such vessels would be traveling at low speed (1-2 mile per hour), maneuvering such large vessels in close quarters like the north canal sometimes is accomplished by intermittent bursts of high engine and propeller speeds, both in forward and reverse gears. Such operations could cause a vessel to lurch in the direction of a manatee; if done in reverse gear, a manatee could be sucked into the speeding propellers. It also is possible for a manatee to be crushed against the bottom or against a structure of the Marina facility during such operations. Despite the possibility of injury to manatees from use of the new proposed travel lift, it is clear that most manatee injuries and deaths from boat collisions occur as a result of propeller injuries from boats being operated at high-speed. Manatees are known to frequent and safely use marinas where large vessels operate at low speed. The risk of danger to manatees from use of the proposed new travel lift can be characterized as being minimal if not speculative, especially in view of the manatee protections in Specific Condition 15 of the 1995 Permit. Initially, DEP misunderstood the nature of the proposed new travel lift, thinking it would greatly increase boat traffic in the north canal. When the minor impact of the project was explained, DEP's concerns were allayed. Greater risk of danger to manatees would occur from the addition of wet slips in the north canal, but those impacts are not secondary to the travel lift proposal; they are completely separate impacts that are governed by the pre-existing 1995 Permit. Petitioner and Intervenor were critical of the absence of a specific condition for the daily logs to be presented to DEP for inspection on a regular basis. See Finding 42, supra. They contended that absence of such a requirement would compromise compliance enforcement. But DEP inspection of the logs at times of its own choosing could be just as effective. The key to enforcement is having an enforceable specific condition limiting use of the travel lift. Petitioner and Intervenor also were critical of using a simple weekly average to limit use of the new travel lift. They correctly argue that the time over which the weekly average would be computed must be designated for such a use limitation to be enforceable. They also contend that there should be a daily limit. Assuming a weekly average limitation of ten, a daily limit of ten would not be unreasonable if it allowed leeway to exceed the daily limit in cases of emergencies such as approaching hurricanes. Replacing Flushing Channel with Culverts Applicant's proposal to replace the 60 foot by 4.5 foot-deep flushing channel with two 48-inch culverts is motivated by practical considerations. Applicant essentially wishes to avoid the expense of constructing the channel required under the 1995 Permit and having to bridge the channel to make use of the peninsula between the central and north canals. Part of the Marina's initial motivation for the channel was to expand operations and allow access to the north canal from the main basin. Part of the channel was to have been used by the Marina as a new forklift area with access to boat storage areas on both sides of the channel. In the 1989 Permit, it was stated that the channel was "to act as a sediment sump." It was not until the 1995 Permit that the channel was said to serve to "improve flushing." Most of the "net improvement" of water quality at the Marina was to come from proposed contamination dredging of the canals (and backfilling with clean sand), removal of contaminated soil from Marina uplands, installation of a redesigned boat-wash area, and installation of an adequate surface water management system. Most flushing benefits were anticipated to come from making the canals shallower by back-filling after dredging. Flushing from the channel was presented as "frosting" on the "net improvement cake." The hydrographic evidence was that the channel, in conjunction with back-filling the Marina's canals, would indeed increase flushing of the Marina's canals to some extent. Looking at the main basin only, the channel would improve flushing by up to 27 percent. But looking at the Marina's canals overall, the channel would only increase flushing by up to 0.6 percent. By comparison, the hydrographic evidence was that the proposed flushing culverts also would contribute to increased flushing but by a smaller amount. Looking at the main basin only, the proposed flushing culverts would improve flushing by up to 4 percent. Looking at the Marina's canals overall, the proposed flushing canal would only increase flushing by up to 0.2 percent. Petitioner and Intervenor question the reliability of Applicant's calculations of flushing times without more up-to- date data on the depths of the canals after contamination and maintenance dredging. But the evidence was that differences in the starting depths would not have a significant effect on the relative changes in flushing times from the channel versus the culverts; the differences would be approximately proportional regardless of the starting depths. In addition, the depths assumed in Applicant's calculations are based on the 1987 data and the requirements of the 1995 Permit. Compliance with the requirements of maintenance dredging and the 1995 Permit can be enforced, if necessary, in other proceedings. See, e.g., DOAH Case No. 98-3901, as to maintenance dredging. Applicant's calculations on flushing times do not account for the possibility of an additional benefit from the proposed flushing culverts. Applicant proposes to locate the culvert inverts at a depth of 6 feet. If a greater salinity gradient exists at that depth, the culverts would have a relative advantage over a 4.5 foot-deep channel in terms of flushing and the exchange of more oxygenated water between the north canal and the main basin. The existence of such a salinity gradient is suggested by data collected in 1997. But salinity gradients are not constant, and water samples were collected only during one 24- hour period in May 1997 and another 24-hour period in September 1997. In addition, no data has been collected after the maintenance and contamination dredging. The sampling in this case was too limited to give reasonable assurance that the proposed flushing culverts would have advantages over the required channel in promoting of flushing. Petitioner and Intervenor contend that changing the open channel to closed culverts would decrease the benefit of oxygen exchange in an open-channel system. It is true that, generally, more oxygen would be introduced in an open system. But the evidence was that none of the "net improvement" to water quality from the specific conditions to the 1995 Permit was anticipated to derive from increases in dissolved oxygen from oxygen exchange in the channel. Conversely, Applicant contended that the proposed culverts would decrease the chances of contamination from the uplands, as compared to an open channel. But there was no specific evidence to support or quantify this speculative benefit. In addition, required improvements in surface water management at the Marina would reduce any such benefits from the culverts. See, Specific Condition 5.B. and DOAH Case No. 98-5409. Approximately 60 feet of mangrove fringe would have to be removed from the north canal to accommodate a flushing channel. In contrast, only approximately 8 feet of mangrove fringe would have to be removed to accommodate the proposed culverts. But there was no evidence as to how removing less of the mangrove fringe would improve flushing or water quality. In addition, Specific Condition 12 of the 1995 Permit required replacement of the mangroves lost in the construction of the flushing channel. There was no evidence that installation of flushing culverts instead of the flushing channel required under the 1995 Permit would have any impact on manatees.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order: granting Applicant's proposed modifications to the 1995 Permit, with the following additional modifications: No use of the new travel lift for boats less than 40 foot in length except in emergencies, e.g., approaching hurricane. Limitation on use of travel lift to a 28- day rolling average of ten vessels a week, except in emergencies, e.g., approaching hurricane. Prohibition against pressure-washing and flushing bilges and engines of vessels on the new travel lift except in the boat wash area to be constructed and operated in accordance with Specific Condition 15 of the 1995 Permit. A requirement to report and promptly clean-up any spills of oil or gasoline in the north canal related to operation of the new travel lift. waiving certification as a precondition to federal permitting under 33 United States Code, Section 1341. DONE AND ENTERED this 21st day of January, 2000, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of January, 2000. COPIES FURNISHED: T. Elaine Holmes, Esquire 14502 North Dale Mabry, Suite 200 Tampa, Florida 33618 David Gluckman, Esquire Gluckman and Gluckman 541 Old Magnolia Road Crawfordville, Florida 32327 Matthew D. Uhle, Esquire Humphrey & Knott, P.A. 1625 Hendry Street Fort Myers, Florida 33901 Francine M. Ffolkes Senior Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri Donaldson, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

USC (2) 33 U. S. C. 134133 U.S.C 1341 Florida Laws (12) 120.52120.569120.57120.60120.6826.012267.061373.406373.4136373.414373.421403.031 Florida Administrative Code (14) 40E-4.05140E-4.30140E-4.30262-312.01062-312.03062-312.05062-312.06062-312.07062-312.10062-343.07062-343.10062-4.04062-4.05062-4.080
# 4
GRACE L. WALDRON vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 87-001727 (1987)
Division of Administrative Hearings, Florida Number: 87-001727 Latest Update: Aug. 19, 1987

Findings Of Fact Grace L. Waldron owns the property in Osceola County where the proposed project is located. Carl Wagner leases a portion of the property and operates a fish camp/bait and tackle shop on the property. On August 22, 1986, the Petitioners submitted an application, designated DER File No. 49-124177-4, to dredge an access canal which would connect an existing elongated borrow pit with Lake Cypress, and to construct two commercial piers, 300 feet long by 4 feet wide, with sixty finger piers, 12 feet long by 2 feet wide. The borrow pit, also called the "existing canal" is approximately 50 feet wide by 800 feet long. The dredging would create a dead end finger canal approximately 1160 feet in length. Approximately 5,800 cubic yards of muck, hard pan and clay would be dredged to create the canal and channel into the waters of the lake.. Lake Cypress is located in the Kissimmee "chain of lakes" a series of lakes connected by man-made canals or by the Kissimmee River. The system is a popular fishing and recreational area. It also has been adversely affected by intense development and volumes of effluent flowing into the lakes. Cypress Lake has very poor water quality. Chlorophyll a consistently runs around 90-160 milligrams per liter (mg/1). DER has a policy of allowing no wasteload allocation if chlorophyll a is greater than 60 mg/1. Biochemical Oxygen Demand (BOD) is also extremely high. A BOD level of 2-3 mg/1 is deemed acceptable. Samples taken by Petitioner's consultants in December 1986, reflected a BOD level of 9.8 mg/l in the lake and 27 mg/1 in the borrow pit. Some violations, though not as serious, were found in the Dissolved Oxygen (DO) standard of 5 mg/1. The creation of a finger canal will create a more serious water quality problem than currently exists. This is evidenced by experiences with such canals throughout the state. Dead-end canals prohibit effective exchange of water and after a period of build-up within the basin, a winter storm event or unusually heavy summer thunder-shower will create a sloshing effect, the toxic plug will be released and the polluted water will flush into the lake, creating a potential fish kill. After a period of buildup, boaters are reluctant to use dead-end finger canals as it is impossible to keep the boats clean. The proposed channel dredging would eliminate approximately 0.25 acres of densely vegetated littoral zone habitat. Such zones provide spawning, nursery and feeding habitat for a wide variety of fish species. Lesser concerns, but nonetheless negative impacts from the project, are a short term increase in turbidity from the dredging of the channel, and the effect on endangered or threatened species of birds found on or near the site. The U.S. Department of the Interior, Fish and Wildlife Service and the U.S. Environmental Protection Agency have commented negatively on the proposed project. These agencies have cited the same concerns with water quality, effect on the littoral zone and effect on wildlife described above, and explained in depth in the testimony of DER's expert witnesses. The Florida Game and Fresh Water Fish Commission, also commenting on the project, has a policy of encouraging development and use of public access facilities and discouraging all private channel construction. On Lake Cypress there exists a public boat ramp and launching facility approximately 300 feet to the north of the proposed project. Other access to the lake is provided through facilities on other lakes in the chain, although these facilities are a considerable driving distance from the proposed site. The public boat ramp on Lake Cypress does not have lights nor restrooms. Parking is limited and Waldron provides parking for boaters at his commercial establishment for $7.00 a year. Carl Wagner presented six pages of signatures obtained from his posting a "Petition" in support of the project at his bait and tackle shop. The Petition cites deficiencies in the existing public facility. Carl Wagner has lived and worked on the Kissimmee chain of lakes for 37 years. He worked for the South Central Florida Flood Control District maintaining pumps and locks for eleven years, and has fished and served as a fishing guide for the remainder. He has an intimate familiarity with the wildlife, fish species, drift and flow of the lakes and weather patterns in the area. His knowledge is valid, though not so technical as that of the various agency experts. His position is that he is just trying to make a living, that if the public ramp and facilities were adequate, he could make a living with a tackle shop, but the public access is not adequate. He concedes that the water quality is bad, but argues that the impact of his project would be so minimal as to be a mere "drop in the bucket". While the applicant has not suggested alternatives, the Department has suggested that a boardwalk could be constructed with a dock extending into the lake, with finger piers. This would avoid the need to dredge a canal and channel, but the environmental impact of the pilings and any navigational hazards have not been fully studied. The applicant has not Suggested mitigation measures to improve water quality, nor is it likely that such measures would be effective.

Recommendation Based on the foregoing, it is hereby, RECOMMENDED: That a Final Order be entered denying permit application number 49-1241774. DONE and RECOMMENDED this 19th day of August, 1987 in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of August, 1987. COPIES FURNISHED: Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Grace L. Waldron Post Office Box 1341 St. Cloud, Florida 32769 Carl W. Wagner Post Office Box 975 KenanSville, Florida 32739 Vivian F. Garfein, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 5
MELVIN J. LANEY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-000871 (1979)
Division of Administrative Hearings, Florida Number: 79-000871 Latest Update: Oct. 28, 1981

Findings Of Fact Petitioner Melvin J. Laney is the owner of Rodriguez Key which is located approximately one and one-half miles from Key Largo, Florida, in the Atlantic Ocean. The island consists of about 170 acres and is undeveloped. It is approximately 9/10 of a mile long and 3/10 of a mile wide. By application, dated July 31, 1978, Petitioner requested a permit from Respondent Department of Environmental Regulation (DER) to conduct specified activities incident to the establishment of a primate breeding and research farm. The proposed activities included the construction of a floating pier, filling a sunken barge which is located 100 feet from the shoreline with coral rock and riprap, constructing two buildings on stilts on the east end of the island, clearing some 8.9 acres of black mangroves to provide trails for the placement and servicing of cages, installation of prepackaged waste treatment units, and temporary cages. (Testimony of Petitioner, Exhibits 1,8) DER's South Florida branch office personnel reviewed the application and issued an intent to deny the requested permit by letter of March 8, 1979, for the reason that Petitioner had failed to obtain local approval required pursuant to Section 253.124,. F.S., and that violations of State water quality standards could be expected by the proposed project. Further, the notice noted that the project would result in adverse effects to marine productivity and wildlife population contrary to the public interest under Chapter 253. Petitioner thereupon requested a hearing. (Petition, Exhibit 6,8) Petitioner plans to bring rhesus, squirrel, and other research primates into the State for the purpose of establishing a breeding and research farm on Rodriguez Key. The primates would be owned by sponsors who would pay Petitioner to provide housing, care and associated services. The project is designed to meet the needs of researchers for the testing of vaccines and other scientific purposes. There is currently a shortage of primates in this country due to a 1978 embargo on the export of such animals by the government of India who had previously been the primary supplier of research primates. (Testimony of Petitioner, Darrow, Exhibit l) Petitioner intends to fill a partly sunken barge near the northeast shoreline with boulders and riprap, cover it with a concrete floor, and construct a floating pier approximately 130 feet long between the shore and the barge for off-loading of supplies and equipment. The project contemplates the construction of an animal care house and a residence, both to be placed on stilts which will each contain a maximum of 10,000 square feet of space. No filling or dredging is planned for either structure. This is a modification from the original permit application which called for some 3,000 cubic yards of fill at the building site. At the western end of the island, Petitioner plans to install 16 rows of prefabricated cages with 64 cages per row, which represents a total area of approximately 12.48 acres. About 4.16 acres of that area will be cleared or otherwise disrupted to place and connect the cage rows. The cages will be secured and there is little likelihood that the animals will escape. Under a current permit from the Fresh Water Game and Fish Commission, the holding cages must be constructed to withstand hurricanes, surge and wind, and provide adequate protection for the animals during such storms. They must also meet or exceed minimum pen specifications established by the Commission. The permit submitted in evidence expired on June 30, 1981. The cages will be prefabricated and placed on metal pilings which are attached to underground rock. There will be troughs located underneath a grate floor for animal wastes which will be collected and pumped to a sewage disposal system. In order to take supplies, materials, and animals to and from the cage area, Petitioner intends to clear a 20-foot wide perimeter "trail" around the island which would be attached at both ends by lateral similar trails. The total distance of the trails is approximately 9,000 feet. The need for a perimeter trail is to deliver materials on one side of the island, service the animals, and then leave by a different route for the purpose of transporting employees, ill animals, or transporting of any animal that might affect the control area for testing and conducting vaccine research. The perimeter trails are designed to be no closer than 75 feet from a red mangrove fringe border around the island. For transportation purposes, it is proposed to use gasoline powered "all terrain" wheeled vehicles which will traverse the trails along two parallel two-inch diameter cables suspended horizontally 36 to 48 inches above the ground level. The cables will be attached to concrete anchors consisting of four inch by four inch steel tubes which are placed at 100 foot intervals along the trails. The tubes will be either hand-driven into subsurface rock several inches or driven by means of a portable pile driver. The tubes will additionally be supported by a concrete block "dead man" attached to a 5/8-inch cable on either side of the tubes and placed underground. Turning platforms would be placed at trail intersections on top of the cable road so that a vehicle could drive upon the platform and execute a turn to a connecting cable road. The low pressure tread vehicles used to traverse the roads will be equipped with shoes or flanges on the inside of the tire rims to securely ride on the pretensioned cables. They will also have low pressure pneumatic tires. The vehicles will also be used in interior areas where mangroves are not present. They will ride on the ground or upon metal plates. These areas are covered with about 9,000 square feet of batis (saltwort) cover which eventually will be killed by vehicle use. Batis is important for sediment stabilization and its removal can cause siltation problems in waters surrounding the island. The need for a 20-foot swath for the cable road is explained by the fact that transport of the 17-foot cages must be accomplished by placing them sideways on the transporting vehicles in order to install and periodically provide service, repair or replacement. A soil study made in representative areas of Rodriguez Key except the west end shows that coral rock exists at levels of approximately 11 to 15 feet below the ground surface, thus necessitating the use of pilings for support purposes rather than shallow footings. Although no soil borings were taken at the west end of the island, the soil expert is of the opinion that the borings reflect general rock characteristics of the entire island. Petitioner's civil engineer who designed the current cable road system prepared several alternative methods of construction, and is of the opinion that suspension of the cables at a height of 15 feet instead of three to four feet as currently planned would be feasible except for cage servicing purposes. A further alternative that was proposed by Petitioner's engineer expert is to place the cages at the east end of the island and utilize a boardwalk constructed of an eight-foot wide precast concrete slab walkway as a boardwalk for positioning of the cages. Six inch by six inch timber posts would be driven to the hardrock layer for a minimum of ten feet to anchor the Platform. The engineer testified that this alternative would be cost effective if used in lieu of the cable road. Respondent's Environmental Specialist testified that such a modification to concentrate the project on the east end of the island would be recommended because it would eliminate the cable road and its adverse environmental consequences Rodriguez Key is almost completely vegetated by mangroves with a red mangrove fringe around the perimeter and black mangroves on the higher interior areas. Some of the red mangroves are 100 to 150 feet in height and the black mangroves range from 20 to 40 feet high. In the east center of the island is an open area of batis, and red mangroves are located in the center and west end of the island. White mangroves are also present in the south side of the island. Throughout the island, there are watermarks on trunks and prop roots ranging from four inches to six inches, and an abundant growth of brown algae. Such algae requires regular submergence to exist. No significant forms of wildlife are present on the island. Batis is a submerged species which is important for sediment stabilization. In order to clear the 20-foot wide trails with cable suspensions as low as 36 inches above ground, it will be necessary to prune or cut back a large number of mangroves to that height. However, the prop roots of the red mangroves extend above six feet in some areas. If the trees and roots are cut to a three-foot height, it is unlikely that they would survive. Red mangroves produce leaf detritus which forms a part of the food chain for marine life. Such trees are island stabilizers which provide filtration and uptake of nutrients associated with runoff and intertidal waters. The waters surrounding the island are categorized as Class III waters under State regulations. The presence of brown algae on prop roots is evidence that the island is regularly inundated to some degree. Turtle grass, which is an indicator of regular tidal flushing, is in abundance on the flats waterward of the island but not found in the interior. During a visit to the Rodriguez Key in 1981, DER personnel observed standing water across the entire island to a depth of from one inch to one foot at high tide. (Testimony of Carroll, Key, Helbling, Exhibits 6, 8) Thirteen public witnesses testified at the hearing, including residents, landowners, and representatives of housing developments in the Key Largo area. They were uniformly opposed to the proposed project for a variety of reasons. Primarily, they fear that the presence of primates on the island a short distance away from Key Largo will produce excessive noise, odor, and water pollution in the adjacent waters which are used for recreation. Additionally, some are of the opinion that their property values will decrease as a result of the activity. A District Naturalist employed by the Department of Natural Resources at the nearby Coral Reef State Park testified that her agency opposes the proposed activity due to concern that it will cause degradation of water quality in the surrounding waters and that increased boat traffic could damage the shallow coral reef beds which lie near the State park. There is also general apprehension among the nearby residents that a hurricane could destroy any facilities on Rodriguez Key and cause damage to their property. A petition signed by a large number of Key Largo residents reflects their opposition to Petitioner's use of Rodriguez Key as a primate breeding and research facility. (Testimony of public witnesses (Hearing Officer's Exhibit 2) Exhibits 9-10) There probably would be no odor problem connected with the presence of monkeys on Rodriguez Key if the cages are regularly cleaned and fecal waste is disposed of according to sanitary methods. Although primates are inclined to vocalize at feeding time or when strangers appear, they do not screech at great length and the presence of trees and other foliage would modify the sound. (Testimony of Darrow)

Recommendation That the application of Petitioner Melvin J. Laney, as modified in the above Conclusions of Law, be approved and that a permit authorizing the requested activities be issued pursuant to Chapter 403, F.S., together with water quality certification under PL-500, subject to standard conditions reasonably necessary for prevention of pollution. DONE and ENTERED this 14th day of September, 1981, in Tallahassee, Florida. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of September, 1981. COPIES FURNISHED: Ross A. McVoy, Esquire Madigan, Parker, Gatlin, Swedmark and Skelding Post Office Box 669 Tallahassee, Florida 32302 Ray Allen, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Honorable Victoria Tschinkel Secretary, Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 =================================================================

Florida Laws (1) 403.087
# 7
FLORIDA AUDUBON SOCIETY vs SUGAR CANE GROWERS COOPERATIVE OF FLORIDA, UNITED STATES SUGAR CORPORATION, SUGAR FARMS CO-OP, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 12-002811 (2012)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 17, 2012 Number: 12-002811 Latest Update: Apr. 22, 2014

The Issue The issue to be determined in this case is whether Respondents, United States Sugar Corporation (“USSC”), Sugar Farms Co-op (“SFC”), and Sugar Cane Growers Cooperative of Florida (“SCGC”) (collectively “the Applicants”) are entitled to the Everglades Works of the District permits (“WOD Permits”), issued to them by the South Florida Water Management District (“District”).

Findings Of Fact The Parties Audubon is a not-for-profit organization dedicated to restoring and conserving natural ecosystems, focusing on birds and their habitats. Audubon has a substantial interest in the protection of the Everglades and other ecosystems in the area. Audubon’s interest is affected by the proposed agency action because the WOD Permits authorize agricultural discharges that affect these ecosystems. The District is a Florida public corporation with the authority and duty to administer regulatory programs in chapter 373, and Florida Administrative Code Title 40E, including a program for regulating discharges from the Everglades Agricultural Area (“EAA”) into works of the District. The EAA is located south of Lake Okeechobee and comprises about 570,000 acres. The majority of EAA agriculture is sugarcane, with some row crops, such as radishes, leafy vegetables, and corn, and turf sod. During fallow periods, rice is also grown. The Applicants are owners and lessees of agricultural lands in the EAA. Background Some essential background for this case is set forth in rule 40E-63.011: The Everglades is a unique national resource. It has a high diversity of species, and provides habitat for large populations of wading birds and several threatened and endangered species, including wood storks, snail kites, bald eagles, Florida panthers, and American crocodiles. Large portions of the northern and eastern Everglades have been drained and converted to agricultural or urban land uses. Only 50% of the original Everglades ecosystem remains today. The remainder is the largest and most important freshwater sub-tropical peatland in North America. The remaining components of the historic Everglades are located in the Water Conservation Areas (WCAs) and Everglades National Park (ENP). ENP and Loxahatchee National Wildlife Refuge (WCA 1) are Outstanding Florida Waters, a designation which requires special protection for the resource. Large portions of the Everglades ecosystem have evolved in response to low ambient concentrations of nutrients and seasonal fluctuations of water levels. Prior to creation of the Everglades Agricultural Area (EAA), nitrogen and phosphorus were mainly supplied to large areas only in rainfall. Phosphorus is the primary limiting nutrient throughout the remaining Everglades. Sawgrass has lower phosphorus requirements than other species of Everglades vegetation. A substantial portion of EAA nutrients is transported to the remaining Everglades either in dissolved or in particulate form in surface waters. The introduction of phosphorus from EAA drainage water has resulted in ecological changes in substantial areas of Everglades marsh. These changes are cultural eutrophication, which is an increase in the supply of nutrients available in the marsh. The increased supply of phosphorus in Everglades marshes has resulted in documented impacts in several trophic levels, including microbial, periphyton, and macrophyte. The areal extent of these impacts is increasing. In 1988, the United States sued the District and the Florida Department of Environmental Regulation, now the Department of Environmental Protection (“DEP”), in federal court, alleging that the agencies failed to enforce Florida’s water quality standard for nutrients in waters of Loxahatchee Wildlife Refuge and Everglades National Park. The principal pollutant of concern was phosphorus. Audubon, USSC, and certain members of SCGC and SFC intervened in the federal case. In February 1992, the parties resolved their dispute through a settlement agreement approved by the federal court (“the Consent Decree”). The Consent Decree required the District and DEP to take action to meet water quality standards by December 31, 2002. At that time, the nutrient water quality standard was a narrative standard, prohibiting the discharge of nutrients so as to cause “an imbalance in natural populations of aquatic flora and fauna.” The Consent Decree directed the District to construct 34,700 acres of stormwater treatment areas (“STAs”) so that nutrient-laden surface water discharged from the EAA could be treated before discharge to the Everglades Protection Area (“EvPA”), which includes Loxahatchee Wildlife Refuge, Everglades National Park, and the Water Conservation Areas. STAs are large freshwater wetlands which remove phosphorus from the water column through physical, chemical, and biological processes such as sedimentation, precipitation, plant growth, and microbial activity. The first STAs were constructed and in operation in 1993. The Applicants operate in the S-5A Basin within the EAA. Their surface water is conveyed to STA-1W for treatment before being discharged to the EvPA. The Consent Decree required the District to initiate a regulatory program by 1992 to require permits for discharges from internal drainage systems (farms) in the EAA. The regulatory program was to be based on agricultural best management practices (“BMPs”). The goal of the program, as stated in the Consent Decree, was to reduce phosphorus loads from the EAA by 25 percent over the base period (1979-1988). In 1992, the District promulgated rule chapter 40E-63, which required EAA farmers to obtain WOD permits and to implement agricultural BMP plans. The BMP plans address fertilizer use and water management. Permittees must also implement a water quality monitoring plan. The rules require reduction of the total phosphorus loads discharged from the EAA Basin, as a whole, by 25 percent from historic levels. See Fla. Admin. Code R. 40E-63.101. If the EAA, as a whole, is in compliance, individual permittees are not required to make changes to their operations. See Fla. Admin. Code R. 40E-63.145(3)(d). If the 25 percent reduction requirement is not met, the rule contemplates that individual permittees in the EAA would have to reduce nutrient loads in their discharges. See Fla. Admin. Code R. 40E-63.145(3)(e).1/ The Consent Decree also required the District to obtain permits from the Department for discharges from the STAs to the EvPA and to conduct research and adopt rules to “numerically interpret” the narrative standard. In 1994, the Florida Legislature enacted the Everglades Forever Act (“the Act”), chapter 94-115, Laws of Florida, which is codified in section 373.4592. The Legislature authorized the district to proceed expeditiously with implementation of the Everglades Program. See § 373.4592(1)(b), Fla. Stat. The “Everglades Program” means the program of projects, regulations, and research described in the Act, including the Everglades Construction Project. The Everglades Construction Project involved the construction of 40,452 acres of STAs, which is 5,350 acres more than was required by the federal Consent Decree. The Act acknowledged the BMP regulatory program for the EAA that the District had established in rule chapter 40E-63, and stated: Prior to the expiration of existing permits, and during each 5-year term of subsequent permits as provided for in this section, those rules shall be amended to implement a comprehensive program of research, testing, and implementation of BMPs that will address all water quality standards within the EAA and Everglades protection Area. See § 373.4592(4)(f)2., Fla. Stat. The Act required DEP to issue permits to the District to construct, operate, and maintain the STAs. See § 373.4592(9)(e), Fla. Stat. The Act required development of a numeric water quality phosphorus standard for the EvPA by 2003. See § 373.4592(4)(e), Fla. Stat. The Act set the goal of achieving the phosphorus standard in all parts of the EvPA by December 31, 2006. In June 1995, modifications were made to the Consent Decree. The deadline for achieving water quality standards in the EvPA was changed from December 31, 2002, to December 31, 2006. The STAs were increased from 34,700 acres to 40,452 acres. The chronological developments outlined above indicate the intent of the Legislature and the parties to the Consent Decree to conform state law and the Consent Decree to each other. In 2001, DEP initiated rulemaking that lead to its adoption of the Phosphorus Rule, rule 62-302.540, in 2003. The rule set a numeric phosphorus criterion for the EvPA of 10 parts per billion (“ppb”), applied through a four-part test in which attainment is determined separately for “unimpacted” and “impacted areas” of the EvPA. See Fla. Admin Code R. 62- 302.540(4). In conjunction with this rulemaking, the DEP and District developed the Everglades Protection Area Tributary Basins Long Term Plan for Achieving Water Quality Goals (“Long- Term Plan”) in March 2003. The Long-Term Plan provided remedial measures and strategies divided into pre-2006 projects and post- 2006 projects. The pre-2006 projects included structural and operational modifications to the existing STAs, implementation of agricultural and urban BMPs in areas outside the EAA or C-139 basins, and construction of several restoration projects congressionally mandated by the Comprehensive Everglades Restoration Plan. Modeling of treatment capabilities of the STAs after implementation of the pre-2006 projects predicted that the 10 ppb standard for phosphorus could be achieved, but not consistently. Therefore, the Long-Term Plan required the District to identify and evaluate methods to improve phosphorus reductions, and if the phosphorus criterion was not achieved by December 31, 2006, to implement post-2006 modifications and improvements. The post- 2006 strategies include projects to expand and improve the STAs. They do not include changes to the BMP program. In 2003, the Legislature substantially amended the Act. It incorporated the Long-Term Plan into the Act, finding that it “provides the best available phosphorus reduction technology based on a combination of the BMPs and STAs.” § 373.4592(3)(b), Fla. Stat. The Long-Term Plan contemplates maintenance of the BMP program in the EAA, with refinements derived from BMP research. Recent Conditions and Events As previously stated, chapter 40E-63 requires the total phosphorus load from the EAA to be reduced by not less than 25 percent from historic levels. Since full implementation of the BMP regulatory program, annual phosphorus loads have been reduced by approximately 50 percent. Despite the efforts and projects undertaken, the phosphorus standard was not being achieved as of December 31, 2006, in all parts of the EvPA. In 2007, the DEP issued a permit to the District for discharges from the STAs to the EvPA (referred to as the “Everglades Forever Act” or “EFA permit”). The permit required the District to design and construct several regional water management projects, including structural enhancements to STA-1W, and the construction of 6,800 acres of additional STAs. The permit and its compliance schedules provided interim relief through 2016 from the water quality based effluent limitation (WQBEL) necessary to achieve the 10 ppb phosphorus standard. The 2007 EFA permit was not challenged by Audubon or any other entity. The District, DEP, and the United States Environmental Protection Agency began working together in 2010 to develop new strategies for achieving compliance with the phosphorus standard in the EvPA. The agencies determined that compliance could be achieved by expanding the STAs by 7,300 acres (6,500 acres would be added to STA-1W) and constructing flow equalization basins to store up to 110,000 acre feet of stormwater runoff. These basins are designed to attenuate peak flows into the STAs in order to improve the processes that remove phosphorus. In September 2012, DEP issued the District a new EFA permit, which authorized continued operation of the District’s S-5A pump station, STA-1W, and the related conveyance systems by which stormwater runoff from the S-5A Basin is ultimately discharged to the EvPA. The permit was issued with a Consent Order, requiring the District to expand STA-1W by 6,500 acres of effective treatment area in accordance with a timeline and the District’s Restoration Strategies. The 2012 EFA Permit and Consent Order were not challenged by Audubon or any other entity. In 2013, the Legislature amended the Act again. The Act’s reference to the Long-Term Plan was revised to include the District’s Restoration Strategies Regional Water Quality Plan, which called for expanding the STAs and constructing flow equalization basins. See § 373.4592(2)(j), Fla. Stat. The Legislature added a finding that “implementation of BMPs, funded by the owners and users of land in the EAA, effectively reduces nutrients in waters flowing into the Everglades Protection Area.” See § 373.4592(1)(g), Fla. Stat. The 2013 amendments indicated the Legislature’s intent to codify into law the strategies developed by the District and other regulatory agencies to achieve water quality standards in the EvPA. Those strategies do not materially change the BMP program in the EAA. The Act and the rules of the District create programs for achieving restoration of the EvPA that rely heavily on the STAs. Over the years, the STAs have repeatedly been enlarged and enhanced. In contrast, the requirement for farmers in the EAA to reduce their phosphorus loading by 25 percent has not changed in 21 years. It is beyond the scope of this proceeding to question the wisdom of the programs that have been established by statute and rule. Whether Additional Water Quality Measures Are Required A principal dispute in this case is whether the WOD Permits must include additional water quality measures to be implemented by the Applicants. Section 373.4592(4)(f)4. provides that, as of December 31, 2006, all EAA permits shall include “additional water quality measures, taking into account the water quality treatment actually provided by the STAs and the effectiveness of the BMPs.” Audubon asserts that the requirement for additional water quality measures has been triggered. The District does not interpret the statute as requiring additional water quality measures under current circumstances. The interpretation of the statute is primarily a disputed issue of law and is addressed in the Conclusions of Law. There, it is concluded that additional water quality measures are not required. Whether the BMP Plans are Adequate Audubon contends that the WOD Permits should be denied because the Applicant’s existing BMP plans are not “tailored” to particular soils, crops, and other conditions. This contention is based on section 373.4592(4)(f)2.c., which states in relevant part: BMPs as required for varying crops and soil types shall be included in permit conditions in the 5-year permits issued pursuant to this section. Audubon showed that the Applicants have similar BMP plans for the thousands of acres covered in the three WOD Permits, and contends that this similarity proves that BMPs are not being tailored to specific farm conditions. However, soils and crops are similar throughout the EAA. The soils of the EAA are almost entirely muck soils and the primary crop is sugarcane with some corn or other vegetable rotated in. The Applicants use many of the same BMPs because they have similar soils and grow similar crops. There are three main categories of BMPs implemented in the EAA: nutrient and sediment control BMPs, particulate matter and sediment control BMPs, and water management BMPs. See Fla. Admin. Code R. 40E-63.136, Appendix A2. The BMPs proposed by the Applicants are based on research in the EAA and recommendations specifically for EAA soils and the crops grown there. The Applications do not identify the specific BMPs that will be implemented, but only the number of BMPs that will be selected from each of the BMP categories (i.e., sediment control). The Applicants must use BMPs on the District’s list of approved BMPs unless an alternative BMP is requested and approved. The lack of greater detail was explained as necessitated by the need for flexibility during the life of the permit to adapt BMPs to varied crops and conditions. Audubon does not believe the BMP plans are tailored enough, but there is no rule criterion for determining how tailored BMP plans must be, except they must achieve the overall goal of reducing phosphorus loading in discharges from the EAA by at least 25 percent. This goal is being achieved.2/ Audubon did not show that any particular BMP being used by an Applicant was the wrong BMP for a particular soil and crop, or identify the BMP that Audubon believes should be used. Audubon failed to prove that the Applicants’ BMP plans do not meet applicable requirements. Whether the Applications Are Complete Audubon contends that the WOD Permits must be denied because the Applications are incomplete. Many of Audubon’s completeness issues deal with minor discrepancies of a type that are more appropriately resolved between the District and applicants, not violations of criteria that are likely to affect a third party’s interest in environmental protection. Rule 40E-63.130 lists the requirements for a permit application for activities in the EAA Basin. An Application Guidebook is incorporated into chapter 40E-63, which contains instructions for completing the application. For applications to renew a permit, the practice of the District is to not require the resubmittal of information that was previously submitted to the District and which has not changed. The Application Guidebook explains this practice. The Applicants supplemented their applications at the final hearing to provide information that Audubon claimed was omitted from the Applications.3/ Audubon contends that the Applications are incomplete because some application forms are not dated and other forms are not signed by appropriate entities. The District explained its rule interpretation and practices associated with the forms. Additional signatures and dates were submitted at the final hearing. Audubon failed to demonstrate that the Applications are incomplete based on the identity of the persons who signed application forms or the lack of dates. Audubon contends the Applications are incomplete because copies of contracts or agreements are not included as required by rule 40E-63.132(3). Audubon failed to prove that contracts and agreements exist that were not included. Audubon contends the Applications are incomplete because they do not contain a completed Form 0779, entitled “Application For A Works Of The District Permit,” as required by rule 40E-63.132(5). In some cases, the information for Form 0779 had been previously submitted and was unchanged, so the District did not require it to be resubmitted for the permit renewal. Additional information was provided at the final hearing. Audubon failed to prove that the Applications are incomplete based on missing information on Form 0779. Audubon contends that the Applications are incomplete because documentation regarding leased parcels was missing. Pursuant to rule 40E-63.130(1)(a), individual permit applications must be submitted by the owner of the land on which a structure is located and any entity responsible for operating the structure, and the permit application must include the owners of all parcels which discharge water tributary to the structure. Applications may be submitted by a lessee if the lessee has the legal and financial capability of implementing the BMP Plan and other permit conditions. The District explained that when applications are submitted by a lessee who will be the permittee or co-permittee, the District requires the lessee to be a responsible party for the entire term of the permit, which is five years. If the lessee is a not a co-permittee, the District does not require information about the lease and does not require the lessee’s signature. If the lessee is a co-permittee, but the lease expires during the term of the permit, the District requires the applicant to modify the permit when the lease expires. Audubon failed to prove that the Applications are incomplete based on lease information Audubon contends that the Applications are incomplete because they fail to show that the Applicants participated in an education and training program as required by rule 40E- 63.136(1)(g). The preponderance of the evidence shows that the Applicants participated in education and training programs. Audubon failed to prove that the Applications are incomplete for any of the reasons raised in its petition for hearing or advanced at the final hearing. Water Quality Standards in the EAA Audubon presented some evidence of algal accumulations in ditches and canals, but the evidence was insufficient to prove the Applicants are violating water quality standards applicable in the EAA. Summary Audubon failed to carry its burden to prove that the Applicants are not entitled to the WOD Permits.

Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that South Florida Water Management District issue Permit Nos. 50-00031-E, 50-00018-E, and 50-00047-E. DONE AND ENTERED this 10th day of February, 2014, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of February, 2014.

CFR (1) 40 CFR 131.44 Florida Laws (6) 120.569120.57171.211373.083373.459263.132 Florida Administrative Code (6) 40E-63.01140E-63.09140E-63.10140E-63.13040E-63.14340E-63.145
# 8
MANASOTA-88, INC. vs. WILBUR BOYD CORP., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-002904 (1985)
Division of Administrative Hearings, Florida Number: 85-002904 Latest Update: Dec. 04, 1986

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: The 626-acre site of the proposed Riverbay development is currently undeveloped land located in Manatee County in the western portion of the City of Bradenton. Specifically, the property lies in Sections 22, 24, and 26. Township 34 South, Range 16 East, Manatee County. The site is owned entirely by Boyd, with the exception of the northern portion for which Boyd has a valid option to purchase. Tampa Bay lies to the north of the site and Perico Bayou lies to the west. Both are natural Class III water bodies. Boyd proposes to develop approximately 325 acres of the site primarily as residential, with an 18-hole golf course and recreational facilities, a commercial/professional area, lakes and attendant streets. The remainder of the site, approximately 300 acres, will be retained as a natural mangrove preserve pursuant to a conservation easement to be executed by Boyd upon receipt of the permit sought in these proceedings. The proposed project has been approved by Manatee County as a planned development residential district with a maximum total number of units not to exceed 957. The Riverbay site has been disturbed by human activity and has been subject to numerous alterations, including extensive mosquito control ditching, dirt roads, borrow pits and a perimeter dike with culverts and flapgates. The government- approved mosquito control ditches resulted in overdrainage of freshwater from adjacent uplands and allowed the incursion of saltwater into the uplands. In order to facilitate and enhance agricultural utilization of the site, and to protect the land from unusually high waters from the Bay, the perimeter dike was constructed with culverts and flapgates in the early 1970's. This dike and other internal drainage systems were designed to reduced interstitial soil salinity so that the land could be utilized for agricultural purposes. The primary site of concern in this proceeding is a sandy area located south of the northern mangrove area and separated from that area by the perimeter dike. Prior to the construction of that dike, the area was inundated by high tides. Since construction of the dike, inundation of the sandy area by marine waters has been limited to unusual storm surges that overtopped the dike or to those occasions when the flapgates required maintenance or adjustment. Over the years following the dike construction, the sandy area has been intermittently planted with grasses, mowed, disked and, when agricultural activities were temporarily reduced in that area, overtaken with some exotic vegetation and other weedy species. The salt tolerant vegetation in the sandy area is currently patchily distributed, and the area has basically little or no productivity in its present state. This is primarily due to the lack of tidal inundation and tidal exchange, which renders the sandy area minimally valuable as habitat for either terrestrial or aquatic organisms. Functioning salt marsh flats, also referred to as salt pans, salterns, salt barrens of salt flat wetlands, constitute an integral part of the life cycles of some fishes, such as snook, mullet and ladyfish. Juvenile fish rely upon these areas for food and protection during this early period of development. High, shallow salt marsh areas are also utilized for feeding purposes by wading birds and shore birds, such as the great egret, white ibis, tricolor heron, green heron and wood stork. While the salt fish flat area on the Boyd site could have value for fish and wildlife if it were returned to tidal influence, its is not currently a productive area from wither a fisheries or wildlife standpoint. Fiddler crab burrows were observed on the site, but these were found mainly around the ditches or existing culverts. The existing site is not conducive in its present state to the feeding, nesting or resting or rare, threatened or endangered species. The original DER jurisdictional determination was performed on the Riverbay site in May of 1983, and resulted in an inclusion of approximately 46 acres, some 35 or which were situated in the sandy area in the northern part of the property. This determination was validated in May of 1985. In the Spring of 1984, Boyd entered into discussions with the DER prior to filing its dredge and fill permit application, and a mutually acceptable site plan and mitigation package was developed. Boyd then submitted its application in February of 1985. After a hearing was requested, DER revisited its prior jurisdictional determination and concluded that it was in need of revision. Utilizing the jurisdictional criteria which existed prior to October 1, 1984, DER reduced the extent of its jurisdictional determination by including only about 16.5 acres of the sandy area, and again noticed its intent to issue the requested permit. At the time DER performed its new jurisdictional, it was its policy to utilize the pre-Henderson vegetation listing to determine jurisdictional wetlands when a grandfathered applicant with a validated jurisdictional line timely requested a reevaluation of that line. The mitigation plan originally proposed by Boyd was not altered as a result of the reduction of impacted jurisdictional acreage to 16.5 acres. The project as proposed by Boyd includes the filling of 16.5 acres of jurisdictional wetlands located in the sandy area discussed above. In mitigation, Boyd proposes to create approximately 17 acres of wetlands from natural uplands located adjacent to undisturbed wetlands in the western portion of the property. Of these 17 acres, 1 1/2 to 5 acres are proposed for a saltern of salt pan habitat. The creation of a salt pan is experimental, but several experts attested to a high probability of success once proper elevations for vegetative plantings are determined. The remainder of the 17 acres of wetlands creation will be graded to the proper elevations, allowed to be inundated with tides and vegetated either naturally with mangroves or will be supplemented with hand plantings. The mitigation plan proposed by Boyd also includes some engineering measures to improve flushing in the northern mangrove area, which was found to be somewhat stressed, a surface water management plan which meets relevant criteria and a perpetual conservation easement to the DER of approximately 300 acres of mangrove areas on the northern and western boundaries of the property. This mangrove fringe will serve as a buffer between the open waters of Tampa Bay and Perico Bayou and the project site. Due to the existence of the perimeter dike, the area to be filled is isolated from Tampa Bay and the adjacent mangroves. The culverts can be sealed during construction to retain all fill materials and turbidity will be controlled. The stormwater system for the project site has received the approval of the Southwest Florida Water Management District and complies with the design and performance criteria set forth in Chapter 17-25, Florida Administrative Code. In its final configuration, the proposed project will contain various freshwater wetlands located landward of the perimeter dike. These include three existing borrow pits and the proposed stormwater retention ponds. These water bodies, as well as the attendant littoral zones surrounding them, will serve as habitat for aquatic and terrestrial organisms. Boyd will utilize state-of-the-art preserved pilings for any wooden structures located in jurisdictional wetlands. Such pilings will be treated in a manner that both prevents deterioration and prohibits the leeching of compounds into the water. At present, DER has no promulgated rule concerning mitigation for dredge and fill projects. Its policy is to review all projects on a case-by-case basis to determine the acceptability of the mitigation package offered by an applicant. DER's goal is to replace the environment with the same benefits to be lost from a particular wetland. DER has no established ratio between the extent of the mitigated area and the area to be filled. The area ultimately accepted in mitigation is dependent upon the existing condition of the area to be filled, in terms of its current form, function and vitality. As opposed to a "like- for-like" mitigation policy, it is DER's policy to review the similarity in form and function between the area to be lost and the area to be created or enhanced by the project. If the area to be lost or filled is stressed or damaged in its existing state, less mitigation is required. When evaluating a proposed dredge and fill project, it is DER's policy and practice to review the current situation on the site. If the site has been altered in a manner which did not require an environmental permit, DER looks at the land as it presently exists, for both jurisdictional purposes and to determine its form, function and viability for mitigation purposes. Neither flapgate maintenance nor mowing requires a DER permit. A DER official could not recall an instance when DER has required a permit for disking. Projects in the area surrounding the Boyd site present no adverse cumulative impacts in relation to the proposed Riverbay project. Indeed, the proposed conservation easement will serve to reduce the impact of this and similar projects on this site and adjacent, wetland areas. Manasota-88, Inc. is incorporated under the laws of the State of Florida as a charitable public interest non-profit corporation and has properly authorized this pending litigation pursuant to its charter and/or bylaws.

Florida Laws (2) 120.57403.412
# 9
SUCROSE GROWERS AND ROGER HATTON vs. CENTRAL AND SOUTH FLORIDA FLOOD CONTROL DISTRICT, 75-001636 (1975)
Division of Administrative Hearings, Florida Number: 75-001636 Latest Update: Mar. 21, 1977

Findings Of Fact Based upon the above testimony and the exhibits received into evidence in this cause, the undersigned Hearing Officer makes the following findings of fact with regard to the issue in dispute: The applicants, as owners and lessees of 3,300 acres of land to be used for sugar cane production, propose to install a surface water management system consisting of levees, ditches, culverts, and pumps for drainage and irrigation purposes. Irrigation will be drawn from and drainage water will be discharged into Canal 51, a project works of the FCD. There is no dispute between the applicant and the FCD staff concerning the permit for water use and connection to C-51. The applicant proposes to discharge, via two 30,000 gallon per minute pumps, one inch per acre per day or 62,239 gallons per minute into C-51. The soils on the applicants' land are primarily muck types which are high in organic nitrogen. A water level of three feet below ground level, as proposed, will probably cause such nitrogen in the muck soil to decompose, resulting in soil subsidence and production of inorganic nitrogen. Nutrients (primarily nitrogen and phosphorus) resulting from muck decomposition and crop fertilization may enter the water in the interior canals and cause such water to have a higher nutrient content. The water in Canal 51 now has low concentrations of nutrients, as compared with the waters in canals appurtenant to other sugar cane producing areas. There appear to be unique hydrological conditions on the land in question which may keep the drainage system flushed and nitrate-free and there is evidence that sawgrass areas act as an effective nutrient filter. There was no evidence that additional nutrients entering C-51 would be environmentally harmful or degrading to the waters in C-51, both parties admitting that further research and scientific data is needed to determine the safe level of nutrients in this area. The applicants and other interested groups have shown that the construction. and operation of a retention or impoundment area would cause an adverse economic impact upon landowners and would have an adverse economic effect upon consumers, the general labor force and the community. The FCD has not adequately demonstrated that the waters of C-51 would be degraded by the applicants' proposed project or that a 140 acre impoundment area would be a reasonable condition to impose upon the issuance of the permits in question. A water quality monitoring system, such as proposed in the original and revised staff reports, will permit the parties to determine whether the water in C-51 is being degraded by the addition of nutrients.

Recommendation Based upon the above cited testimony, evidence, findings of fact and conclusions off law, the following recommendations are made: It is recommended that a water use permit, a Surface water management permit and a right-of-way occupancy permit be issued, all in accordance with the recommendations and conditions set forth in the original Staff Report dated August 5, 1975, attached hereto as Exhibit A. It is recommended that the additional requirement of a 140-acre retention area set forth in the Revised Staff Report be rejected. It is further recommended that an additional condition be attached to the surface water management permit. That condition would be to have such permit expire at the same time as the water use permit; to wit: July 15, 1977, so as to allow the FCD and the applicants sufficient time to collect further data on the effect of nutrients on the waters of C-51 and compare said data with the information derived from the monitoring program required under the permits. If such data and comparisons sufficiently demonstrate that the waters of C-51 will be degraded by the applicants' project, a retention area requirement would then be a reasonable condition to the reissuance of a permit. Respectfully submitted and entered this 20th day of October, 1975, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: George H. Bailey, Esquire JONES, PAINE & FOSTER, P.A. 601 Flagler Drive Court Post Office Drawer E West Palm Beach, Florida 33402 John Wheeler, Esquire Attorney for the Central and Southern Florida Flood Control District Post Office Box V West Palm Beach, Florida =================================================================

Florida Laws (3) 373.016373.413373.416
# 10