The Issue Whether the Respondent, Peter Battle, committed the offenses alleged in the Administrative Complaint and, if so, what discipline should be imposed against his roofing contractor's license.
Findings Of Fact At all times pertinent to this proceeding, Respondent, Peter Battle, was a certified roofing contractor having been issued License No. C-1959 and was the certified contractor for Battle Roofing Company. On September 18, 1996, the Town of Redington Beach approved and issued a roofing permit to Battle Roofing Co. to replace the roof of a house located a 16215 Second Street, East, Redington Beach, Florida. In Redington Beach, inspections of construction sites are conducted only in the following instances: (1) upon request by the property owner or the contractor working at the site; (2) to determine if a proper permit has been secured for the work being performed; or (3) when apparent violations of the Standard Building Code can be viewed by local code enforcement personnel from the street or right-of-way adjacent to the site where work is being performed. On October 16, 1996, while driving on the street adjacent to the site of the roofing project, William Keeley, Building Code Administrator for the Town of Redington Beach, observed the roofing system being installed by Respondent. At that time, it was apparent to Mr. Keeley that the roof being installed by Respondent was a low-sloped roof. Moreover, it appeared to Mr. Keeley that the low-sloped roof being installed by Respondent had single-ply base sheets. Because the Standard Building Code, required double-ply base sheets for a low sloped roof, Mr. Keeley went on the property to inspect the roofing project. As a result of the inspection, Mr. Keeley determined two violations of the Standard Building Code; detailed the code violations on a written rejection notice; and posted the rejection notice at the site. The rejection notice indicated that Respondent (1) failed to use two-ply base sheets as required by Section 1509.4.21 of the Standard Building Code and (2) failed to use six nails or fasteners per shingle as required by Section 1509.3.5 of the Standard Building Code. On October 16, 1996, Mr. Keeley met and discussed with Respondent the violations of the Standard Building Code that Mr. Keeley's inspection had revealed. Furthermore, Mr. Keeley informed Respondent that the deficiencies must be corrected and brought into compliance with the applicable provisions of the Standard Building Code. Another inspection of the roof of the Redington Beach house was performed by Mr. Keeley on March 4, 1997. At that time, it was determined that the violations cited on the rejection notice issued on October 16, 1997, had not yet been corrected. Moreover, the March 4, 1997, inspection of the subject roofing project revealed several other deficiencies and violations of the Standard Building Code. These deficiencies included the following: (1) The rakes were not nailed and cemented as required by Section 1509.4.2.3 of the Standard Building Code; (2) The valley lining was not cemented and was only 14 inches wide in violation of Section 1509.14.3.2 of the Standard Building Code; (3) One shingle on the north and south rakes was short and tabs were missing; (4) The lap at the tie into the porch roof was not cemented as required due to the house being located in a high wind area; and (5) The area on south side of house where soffit and fascia meet was not sealed and secured. On or about March 7, 1997, Mr. Keeley filed a formal complaint with the Pinellas County Construction Licensing Board against Respondent. As a basis therefore, Mr. Keeley cited the deficiencies noted in paragraphs 5 and 8 above. A third inspection of the roofing project was conducted by Mr. Keeley on August 1, 1997. This inspection revealed that only one of the previously noted deficiencies was corrected to comply with the Standard Building Code. The corrected deficiency involved the lap at the tie into the porch roof which previously had not been cemented. Other deficient areas noted in the October 1996 and March 1997 inspections were still in noncompliance with the Standard Building Code at the August 1997 inspection. There is no evidence that Respondent's license as a roofing contractor has been subjected to disciplinary action on any prior occasion by Petitioner.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Pinellas County Construction Licensing Board enter a Final Order that finds that: Respondent, Peter Battle, committed the offense alleged in Count One of the Administrative Complaint, violated Chapter 89-504, Section 24(2)(d) and (j), Laws of Florida, and which imposes an administrative fine of $300 for this violation. Respondent violated Chapter 89-504, Section 24(2)(m), Laws of Florida, is guilty of incompetence as alleged in Count Two of the Administrative Complaint, and which imposes an administrative fine of $300 for this violation. DONE AND ENTERED this 22nd day of October, 1997, in Tallahassee, Leon County, Florida. COPIES FURNISHED: _ CAROLYN S. HOLIFIELD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of October, 1997. William J. Owens, Executive Director Pinellas County Construction Licensing Board 11701 Belcher Road, Suite 102 Largo, Florida 34643-5116 Peter Battle, pro se 1090 Sixty-Fourth Avenue, South St. Petersburg, Florida 33705 Howard Bernstein, Esquire County Attorney's Office 315 Court Street Clearwater, Florida 34616
The Issue Whether Petitioner is entitled to licensure as a Certified Building Contractor or Residential Contractor.
Findings Of Fact Petitioner is a 44-year-old male. He was born and raised in Tallahassee, Florida. He is a high school graduate. Petitioner passed the examination for licensure as a certified building contractor. This is a comprehensive examination that is designed to test knowledge in all aspects of the construction industry. Passing it is a mandatory prerequisite before an application can be considered by the Florida Construction Industry Licensing Board (FCILB). However, passing the examination does not eliminate or modify the statutory or rule experience requirements. Petitioner submitted his application for a certified building contractor license on or about March 24, 2008. By letter of May 2, 2008, the Department of Business and Professional Regulation requested additional information. Petitioner then provided a revised affidavit from Chad Banks, a certified building contractor, and a letter from the Maintenance Construction Chief of the City of Tallahassee’s Gas Utility Department, each containing more detailed information about Petitioner’s experience. These items were received by Respondent on May 23, 2008. It is not clear whether Petitioner requested and was granted a continuance of his appearance with regard to the instant license application at an earlier FCILB meeting, but on January 15, 2009, the full Board considered Petitioner’s application at a duly-noticed public meeting in Altamonte Springs, Florida. At that time, Petitioner was present. During his appearance before the full Board on January 15, 2009, Petitioner was very nervous, but he believes that one of the Board members offered him, or at least asked him if he would accept, a residential contractor’s license in place of a certified building contractor’s license, and that he answered that he would accept such a license, only to have that “offer and acceptance” voted down by the full Board. However, Petitioner does not rule out the possibility that the vote taken at the meeting was actually with regard to denying the certified building contractor license for which he had applied. There is no evidence that Petitioner has ever submitted an application for a residential contractor’s license. By a Notice of Intent to Deny, dated March 16, 2009, and mailed March 24, 2009, the FCILB formally denied Petitioner’s application for a certified building contractor License stating: The applicant failed to demonstrate the required experience, pursuant to Section 489.111, Florida Statutes and Rule 61G4- 15.001, Florida Administrative Code. Petitioner seeks licensure as one who has four years of active experience and who has learned the trade by serving an apprenticeship as a skilled worker or as a foreman, at least one year of which experience is as a foreman. Petitioner has never worked as a full-time employee of a commercial or residential contractor. Petitioner got early experience in construction working around eight rental properties owned by his father. He performed light carpentry, deck construction, general handyman repairs, and some plumbing and roofing when he was approximately 16 to 21 years of age. However, Petitioner essentially relies on a work history that includes working as a plumber for Jim Bennett Plumbing from 1987 to 1993; as a foreman for the City of Tallahassee Gas Department from 1995 to 2005; as a “contractor trainee” for Chad Banks from 1999 to 2002; as having volunteered as superintendent for Gulf Coast Painting from 2003 to 2007; and as a maintenance man for the City of Tallahassee Parks Department from 2006 to 2007. Petitioner’s dates of employment overlap, because his volunteer experience was acquired mostly on weekends, holidays, in hours after he had already completed a full work day for the City of Tallahassee, or on “time off” from his regular employments with the City. Petitioner is a hard worker and wanted to learn the construction trade, but his volunteer construction jobs were intermittent, and he provided no clear assessment of the number of hours per week or month that he put in for any of them. From 1987 to 1993, Petitioner worked for Jim Bennett Plumbing. He started as a plumber’s helper and progressed to greater responsibility. In that position, he acquired a wide range of experience in plumbing for some residential, but mostly commercial, buildings. During this period, he also did some light cosmetic carpentry and tile work to restore building parts damaged by the installation of plumbing apparatus. Much of Petitioner’s construction experience relates to his association with Chad Banks, who testified that at all times material, Petitioner had “hands on” experience, working for him and that Petitioner was a competent worker. Petitioner has never been a “W-2 employee” of Mr. Banks, but there is no specific statutory or rule requirement that the experience necessary to qualify for the certified building contractor or the residential contractor license must be as a “W-2 employee.” Cf. Conclusions of Law. Mr. Banks was not licensed as a certified building contractor until 1999. Petitioner did some work for Mr. Banks when Mr. Banks was working as a sub-contractor on commercial projects (specifically one or more Super-Lube buildings) prior to Mr. Banks obtaining his certified building contractor’s license in 1999. Most of this employment involved pouring concrete slabs. Petitioner claims experience in “elevated slabs,” limited to the construction of a single Super-Lube building, which Petitioner described as laying a slab below ground level for mechanics to stand on and an at-ground level slab for cars to drive onto the lift for an oil change. He described no truly “elevated” slabs or floors above ground level on this project, and Petitioner’s and Mr. Banks’ testimony was vague as to Petitioner’s responsibilities on this project and as to the project’s duration. The general contractor on this project for whom Mr. Banks “subbed” did not testify. From this, and other employments, Petitioner has experience pouring foundation slabs, but he has never worked on a foundation slab in excess of 20,000 square feet. Petitioner also assisted in Mr. Banks’ construction of some rental sheds, but it is unclear if this was before or after Mr. Banks was licensed. Petitioner worked for Mr. Banks d/b/a C. B. Construction, Inc., in a volunteer capacity on exclusively residential construction from 1999 to 2002, and again from February 2004 to March 2008. During these periods, Petitioner and Mr. Banks considered Petitioner a “contractor trainee,” but Petitioner’s work for Mr. Banks was neither exclusive nor continuous; both men described it as “volunteer” work; and some of it seems to have amounted to Petitioner's looking over work done personally by Mr. Banks and having Mr. Banks explain to him, via a plan sheet, what Mr. Banks had already done personally. There is no evidence that during this time frame Petitioner worked for Mr. Banks as a foreman. Petitioner has the ability to “read” many types of construction “plans.” Petitioner has experience with slab footers, but he has not constructed red iron structural steel qualified for framing a building. Petitioner has experience in decorative masonry walls, but he has not constructed structural masonry walls of a type that would support framing members of a building or other vertical construction. Petitioner also worked for the City of Tallahassee as a “W-2” employee, mostly as a foreman overseeing a crew of four workers, from 1995 to 2005. In that capacity, he worked on a church, but the church itself had been constructed several years previously, and Petitioner’s crew’s contribution was tying-in several gas lines during a roadway development project and keeping all the utilities up and running during the project, while a private contractor worked on the church. With regard to the foregoing project and many others for the City Utilities Department, Petitioner directed a crew that built sidewalks and gutters or that tied these features into existing roadways and driveways. In that capacity, he often coordinated activities with residential contractors. Over his ten years’ employment with the City Utilities, Petitioner also directed a crew that exclusively created underground vaults for the housing and shelter of utility apparatus. However, none of his endeavors for the City Utilities involved vertical structural construction for floors above ground. Petitioner has also built new gas stations for the City’s natural gas vehicles, and has erected pre-fab utility buildings, including much slab work, but the nature and duration of these endeavors is not sufficiently clear to categorize them as qualifying him for the certified building contractor license. Most of Petitioner’s experience with the City, as substantiated by the letter of the City Utilities Maintenance Construction Chief, Mr. Lavine, has been in the construction of driveways, roads, gutters, storm drains, sidewalks, culverts, underground utility structures, plumbing and gas lines. While it is accepted that Petitioner has worked on such projects, this type of work more properly falls in the categories of “plumbing contractor” or “underground utility contractor” and Mr. Lavine was not demonstrated to have any certification/licensure in a category appropriate to Petitioner’s application. (See Conclusions of Law.) Sometime after 2005, for approximately a year, Petitioner was employed by the City of Tallahassee Parks and Recreation Department and in that capacity participated in at least one construction of a dugout and a concession stand at one of its playgrounds. He also did repairs on several dugouts and concession stands, but this latter work would not be classified as “structural” construction. Petitioner’s experience in precast concrete structures is limited to his work with gas utility structures, but does not include work on precast tilt walls, which are the type of walls that are constructed off-site, delivered to the job site, placed on the slab foundation, and raised in place as part of an on- going commercial building project. Petitioner has no experience in column erection. “Columns” in this context within the construction trade refers to supports for upper level structural members, which would entail vertical construction. Petitioner’s experience in concrete formwork does not include experience in the structurally reinforced concrete formwork that would be used in vertical buildings, such as all floors above ground level. FCILB’s Chairman testified that the Board interprets the type of experience necessary to comply with the statutes and rules, more particularly Florida Administrative Code Rule 61G4- 15.001(2), to be “structural experience.” There is no affirmative evidence that Petitioner has ever notified the Clerk of the Agency that he was relying on a right to a default license.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Construction Industry Licensing Board enter a Final Order denying Petitioner’s application for licensure as a Certified Building Contractor. DONE AND ENTERED this 24th day of November, 2009, in Tallahassee, Leon County, Florida. S ELLA JANE P. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of November, 2009.
Findings Of Fact At all times relevant, the Respondent was licensed by the Construction Industry Licensing Board as follows: License No(s): RC 0021957 Licensed as: Registered roofing contractor Address of record is in: New Port Richey, Florida A certain contracting job was undertaken as follows: Customer: Stella Domas Approximate contract date: 6-85 Approximate price: $600 Job location: New Port Richey, Florida Job generally consisted of: Repair roof of Customer's house Said job was undertaken by the contracting business Respondent was associated with and responsible for in his capacity as a licensee. Respondent proceeded without a timely permit having been issued, violating local law, either deliberately or through improper supervision, in violation of 489.129(1)(d), (m), (j) 489.119; and 489.105(4), Florida Statutes. Respondent proceeded without timely obtaining all required inspections, violating local law, either deliberately or through improper supervision, in violation of 489.129(1)(d), (m), (j); 489.119; 489.105(4), Florida Statutes. Respondent gave a guarantee on said job to the Customer, and thereafter failed to reasonably honor said guarantee, in violation of 489.129(1)(m), (j); 489.119; 489.105(4), Florida Statutes. Respondent performed said work in a substantially deficient manner, therefore, violating 489.129(1)(m). Respondent previously has been disciplined by the State Construction Board. STIPULATED DISPOSITION Based on the Stipulated Findings Of Fact and Conclusions Of Law, the parties agree to the following disposition of the Amended Administrative Complaint: The Respondent shall pay a $1500 fine, payable within 60 days from entry of a final order approving this stipulated disposition; and The Respondent's registered roofing contractor license number RC 0021957 shall be suspended for 60 days, beginning 60 days from the entry of a final order approving this stipulated disposition.
Recommendation It is recommended that the Construction Industry Licensing Board enter a final order approving and incorporating the settlement stipulation between the parties. RECOMMENDED 28th day of July, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of July, 1988. COPIES FURNISHED: Jack M. Larkin, Esquire 806 Jackson Street Tampa, Florida 33602 Lee Ellen Acevedo, Esquire 7716 Massachusetts Avenue New Port Richey, Florida 34653 Fred Seely, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750
The Issue The issue is whether respondent's license as a registered roofing contractor should be disciplined for the reasons set forth in the administrative complaint.
Findings Of Fact Based upon the entire record, the following findings of fact are determined: At all times relevant hereto, respondent, Raymond D. Simmons, was licensed as a registered roofing contractor having been issued license number RC 0055320 by petitioner, Department of Professional Regulation, Construction Industry Licensing Board (Board). He has been licensed as a roofing contractor since November 1987. The Board's official records reflect that on July 1, 1991, the license was placed on the delinquent status for non-renewal and is now considered "invalid." 1/ When the events herein occurred, respondent was the qualifying agent for Simmons and Sons Plumbing and Roofing, Route 1, Box 191 (County Road 225), Waldo, Florida. Except for this action, there is no evidence that respondent has ever been disciplined by the Board. On May 3, 1988, respondent submitted a proposal to Charles and Thea Ansman to repair the roof on their home located at 5132 N. W. 29th Street, Gainesville, Florida. With minor modifications, the proposal was accepted by the Ansmans on May 10, 1988. According to the agreement, respondent was to perform the following services: Tear off old shingles dry-in with 15 lb. felt and replace with Corning Owens 20 year fungus resistant shingles. Replace all plumbing stacks and ease drips. Will replace back porch with 3-ply build-up roof will coat it with roof coating 10 year warranty on workmanship 20 year manufactor [sic] on shingles and build-up roof. Will replace all wood that needs to be replaced. Although the agreement does not specifically refer to ridge vents, the parties also agreed that respondent would install a ridge vent on the home. On May 16, 1988, respondent made application for a building permit from the City of Gainesville to "reroof" the Ansman's home. The permit was issued on May 20, 1988, in the name of Simmons & Sons Plumbing and Roofing. Respondent commenced work on the project on May 16 and continued the work over a period of several days. During this period of time, respondent was frequently on the job site overseeing the work. Indeed, Thea Ansman said respondent was at her home approximately half of the time while the repairs were being made. Thus, while respondent undoubtedly supervised the job, for the reasons stated in findings of fact 6 and 7, he nonetheless failed to "properly" supervise the work. On May 20, 1988, Thea Ansman paid respondent in full for the work. Although the job was not finished, respondent told Mrs. Ansman he would return the next day to complete the work. When respondent failed to return, the Ansmans repeatedly telephoned him during the next few months, but respondent either refused to speak with the Ansmans or told them he would return within a few days. However, the work was never finished and respondent never returned to the job site. While inspecting the roof one day, Charles Ansman noted that the roof trusses, an intregal part of the load bearing capacity of the structure, were cut at their peaks. The depth of the cuts was between one and two inches and was apparently the result of a saw-blade not set at the proper height when the ridge vent was installed. Sometime in July or August 1988 Charles Ansman discussed the damage with respondent and requested that respondent repair the same. Respondent refused to do so on the ground he was not responsible for the damage. Ansman then filed a complaint with the City of Gainesville Building Department. On September 9, 1988, a city building inspector inspected the home and confirmed that virtually every truss was cut and that the integrity of the roof was in jeopardy. He also observed that the soffits were improperly installed in some cases, and in others, were missing altogether. A notice of violation was then issued by the city on October 3, 1988, charging respondent with violating the Standard Building Code in two respects. More specifically, it was charged that respondent's workmanship violated sections 1701.1.1 and 1708.2.1 of the 1985 Standard Building Code, as amended through 1987. These sections pertain to the quality and design of wood trusses and the design of trussed rafters, respectively. At a hearing before the city's Trade Qualifying Board, respondent admitted his workers had violated the cited sections and caused the damage to the trusses. However, respondent denied liability on the theory that the workers, and not he personally, had negligently damaged the house. Respondent was thereafter issued a letter of reprimand for his actions. In order to recover their damages, which included the replacement of all damaged trusses, the Ansmans filed suit against respondent in Alachua County small claims court. On April 18, 1989, they received a judgment in the amount of $1,050. The judgment was eventually satisfied but only after the Ansmans threatened to levy on respondent's real property located in Alachua County. In preparation for the suit, the Ansmans obtained an engineering report which corroborates the findings made by the city building inspector concerning the damage and negligence on the part of respondent's work crew. By allowing the work to be performed in that manner, respondent was incompetent and committed misconduct in his practice of contracting. However, there is no evidence that respondent was grossly negligent during his supervision of the job. Respondent did not appear at hearing. However, prior to hearing he spoke to the city building inspector and acknowledged that the roof trusses were damaged as the result of negligence on the part of his crew. He also admitted this during the final hearing on the small claims action. At the same time, he denied that his workers had ever touched the soffits. This assertion, however, is rejected as not being credible.
Recommendation Based upon the foregoing findings of facts and conclusions of law, it is, recommended that respondent be found guilty of violating Subsection 489.129(1)(m), Florida Statutes (1987), and that he pay a $1000 fine and his license be suspended for one year. RECOMMENDED this 16th day of December, 1991, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of December, 1991.
The Issue Whether the respondent committed the violations alleged in the Administrative Complaint, and, if so, the penalty which should be imposed.
Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: The Department of Business and Professional Regulation is the state agency responsible for investigating and prosecuting complaints made to the Department for violations of the requirements of chapter 489, part I, Florida Statutes. Sections 489.131(7)(e) and 455.225, Fla. Stat. Pursuant to section 489.129(1), the Construction Industry Licensing Board ("Board") is the entity responsible for imposing discipline for the violations set out in that section. At all times material to this case, Mr. Cote was a certified general contractor operating under License Number CGC006199 issued by the Construction Industry Licensing Board. Mr. Cote currently holds this license, and he has been a licensed general contractor since 1973. At all times material to this case, Mr. Cote was the licensed qualifying agent for JLC Enterprises, Inc. On January 12, 1995, Noel Mais, on behalf of Noel Mais Roofing, contracted with Judith Braun to re-roof property she owned located at 8914 Northwest 26th Court, Coral Springs, Florida. The contract price was $7,000.00, with $3,000.00 required as a down-payment, $3,000.00 to be paid after the roof was dried in, and $1,000.00 to be paid on completion of the project. Neither Mr. Cote nor JLC Enterprises, Inc., was a party to this contract. In late January, 1995, Mr. Mais approached Mr. Cote and requested that he apply for the necessary building permit from the City of Coral Springs. He provided to Mr. Cote a workers' compensation waiver and exemption, a Certificate of Insurance for general commercial liability insurance, and a Certificate of Competency issued by Broward County, Florida, with an expiration date of August 31, 1995. Mr. Mais also told Mr. Cote that he had submitted all of the papers necessary to register his Broward County Certificate of Competency with the state but had not yet received his registration. Mr. Cote relied on the documents and the representations of Mr. Mais regarding his registration status with the state. On or about February 1, 1995,1 Mr. Cote submitted an application to the City of Coral Springs for a building permit to re-roof property owned by Ms. Braun and located at 8914 Northwest 26th Court, Coral Springs, Florida, naming JLC Enterprises, Inc., as the contractor and identifying the estimated cost of the project at $7,000.00. Mr. Mais gave Mr. Cote $300.00 when he applied for the permit. Mr. Cote used $150.00 of this money to pay the permit application fee and $60.00 to pay for two re- inspections which had to be done on the roof. On or about February 17, 1995, the City of Coral Springs issued Permit Number 95-443.2 Mr. Mais commenced work on the project a few weeks after the contract was signed, but before Mr. Cote applied for the permit. According to Ms. Braun, Mr. Mais started "like gangbusters" and quickly stripped the old tiles off of the roof and applied the tar paper. After Mr. Cote agreed to apply for the permit, he told Mr. Mais not to work on the project until the permit was issued. According to Mr. Cote, Mr. Mais returned to work the day after the permit was issued and, the "next day," the job failed inspection because the nail spacing was not consistent with the new code. Mr. Mais re-nailed the roof according to code, but it failed re-inspection because the flashing was not painted. This was done, and the job passed a second re-inspection. Mr. Cote looked in on the job a couple of times after this and saw that nothing was being done. He contacted Mr. Mais and asked why he was not working on the project, and Mr. Mais told him that he was waiting for Ms. Braun to give him some money so he could buy the tiles. When Ms. Braun called Mr. Cote and complained that no tile had been delivered, he went to Mr. Mais's home and insisted that he "get some tile on that roof." The next day, Mr. Mais brought a load of tiles and piled them on the roof.3 Ms. Braun paid Noel Mais the $3,000.00 down-payment specified in the contract by a check dated January 12, 1995, the day the contract was executed. Then, notwithstanding the payment schedule stated in the contract, Ms. Braun paid Mr. Mais $3,000.00 by check dated January 25, 1995. She paid Mr. Mais the remaining $1,000.00 due under the contract by checks dated March 28 and 31, 1995, and April 13, 1995. After receiving full payment, Mr. Mais abandoned the job, and, when Ms. Braun told Mr. Cote she had paid Noel Mais in full for the job, Mr. Cote refused to finish the work because he had not received any portion of the payment. In November, 1995, Ms. Braun contracted with R. J. Chambers Roofing, Inc., to complete the work on her roof for $4,500.00. The work was completed, and she paid Mr. Chambers the contract price. The evidence presented by the Department is sufficient to establish that Mr. Cote knew that Mr. Mais was not registered with the State of Florida as a roofing contractor and that Mr. Cote stated on the permit application that his company, JLC Enterprises, Inc., was the contractor for the Braun re-roofing job even though he was not a party to the contract.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Construction Industry Licensing Board issue a Final Order finding that Jacques Cote violated section 489.129(1)(e) and (n), Florida Statutes; imposing an administrative fine in the total amount of $1,000.00, consisting of a $500.00 fine for each of the two violations; assessing the costs of investigating and prosecuting the violations; and requiring Mr. Cote to make restitution to Judith Braun in the amount of $1,000.00. DONE AND ENTERED this 6th day of May, 1997, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 6th day of May, 1997.
The Issue The issue is whether Respondent's license as a registered building contractor should be disciplined for the acts alleged in the Administrative Complaint, as amended?
Findings Of Fact Respondent, Robert Tucker, is a registered building contractor holding State of Florida license number RB 0033063 (Ex. 7). Respondent was licensed as a building contractor by the State of Florida in September 1978, and has remained licensed at all times material hereto (Ex. 7). Since September 20, 1978, Respondent has held a local Building Contractor's License issued by the Leon County Contractor Licensing and Examination Board (Ex. 7). Respondent's license with the Department has been delinquent since July 1, 1985 (Ex. 7). In July 1983, Respondent made an oral agreement with Violet Gladieux to erect a carport for her at a cost of $1,350 (Ex. 3). Ms. Gladieux's residence is located at 2321 Belle Vue Way, within the city limits of Tallahassee. Jay Gladieux, Jr. became acquainted with Mr. Tucker from his position as an employee of Mr. Tucker on a prior construction project. Mr. Gladieux introduced his mother, Ms. Gladieux, to Mr. Tucker for the carport construction. It was orally agreed that Ms. Gladieux would pay Mr. Tucker for supplies as they were needed. Mr. Tucker began erection of the carport approximately one week after July 11, 1983, when he received the first payment of $300. On July 29, 1983, Mr. Tucker received final payment of $350 so that he could complete the carport (Ex. 3). Approximately two weeks after July 29, 1983, Respondent completed the carport. A permit for the erection of the carport was required by Section 7-63, Buildings and Construction Regulations (The Building Code) of the City of Tallahassee. The language of that ordinance has not changed since 1957 (Ex. 1). No building permit was ever obtained by Mr. Tucker for erection of the carport. Approximately two weeks after completion of the carport, it collapsed after a heavy rainfall (Ex. 4 and 5). Mr. Tucker returned to repair the damaged carport. He erected center studs and was to return later to complete the damage repair. Mr. Tucker has failed to return to complete the damage repair after requested to do so by Jay Gladieux. When an administrative complaint has been filed against a contractor, personal service of the complaint is attempted upon the contractor at his last address of record. If personal service cannot be effectuated at the contractor's last address of record, further attempts are made to locate the contractor. The building departments, both City and County, the telephone company, utility company and post office are contacted. The building departments are contacted to determine if the contractor has obtained any permits, for the permits would list the contractor's address. The telephone company is contacted for prior and new telephone listing(s) with address(es). The post office is contacted for forwarding address(es). The utility company is contacted for new utility service which would contain a new address (es). If the contractor cannot be located after using these avenues, a diligent search affidavit is executed by the investigator who is attempting to serve the contractor. In September 1978 and at all times pertaining to the construction of the carport, Respondent's address of record with the Department was 1515-21 Paul Russell Road and P.O. Box 20234, Tallahassee, Florida. Respondent had not notified the Department of Professional Regulation, Construction Industry Licensing Board of any change in his address (Ex. 7), other than by the new address revealed on the Election of Rights form he filed in response to the administrative complaint. The Department attempted to personally serve Mr. Tucker at his listed address and could not locate him there. On May 21, 1984, Robert E. Connell, an investigator for the Department of Professional Regulation, executed a diligent search affidavit concerning service of the Administrative Complaint upon Mr. Tucker in this proceeding (Ex. 8).
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that Respondent be found guilty of the charges in count one of the Administrative Complaint, as amended; that counts two and three be dismissed; and that he be fined $250.00. DONE AND ORDERED this 4th day of April 1986 in Tallahassee, Leon County, Florida. WILLIAM R. DORSEY,JR., Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of April 1986. COPIES FURNISHED: Mr. James Linnan Executive Director Construction Industry Licensing Board P.O. Box 2 Jacksonville, Florida 32202 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Errol H. Powell, Esq. Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Robert Tucker P.O. Box 10218 Tallahassee, Florida 32302
Findings Of Fact At all times relevant hereto Jonas C. Merricks, Respondent, was licensed by the Construction Industry Licensing Board, Petitioner, as a residential building contractor. In May 1981 Respondent was approached by John Oden regarding a building permit to add a room to the residence of Ms. Betty J. Wilson. Respondent testified he went to see Ms. Wilson to discuss the permit before pulling the permit; however, Ms. Wilson testified she did not see Respondent until after the word started. Regardless of the correct version Respondent pulled the permit for the construction knowing that he was not going to do the work. On May 23, 1981 Ms. Wilson entered into a contract with John Oden to construct an additional room on her residence. This contract was modified on May 26, 1981 to enlarge the room two feet and it is this contract (Exhibit 3), upon which the work was done. The contract made no mention of Respondent or of J & J Building Company which is owned by Respondent. Under the terms of the contract Ms. Wilson was to pay Oden one-third when walls were up, one-third when the roof was on and the final one-third when the job was completed. During the course of the construction Respondent appeared on the site a few times and straightened out existing problems. Ms. Wilson made all of her payments to Oden in accordance with the contract. However, she made the final payment before the work was completed. Her attempts to get Oden to satisfactorily complete the job were unsuccessful and Ms. Wilson complained to the Bureau of Consumer Affairs who referred her complaint to the Construction Industry Licensing Board which investigated and filed the complaint here under consideration. No evidence was submitted that Respondent pulled permits for work done by J & J Building Company. Evidence was presented that J & J Building Company is not licensed by petitioner. Respondent testified that he pulled the permit as a favor to Ms. Wilson and not for Oden, and that he did not know Oden had contracted with Ms. Wilson to do this job. However, Respondent did know that Oden was going to build the addition for Ms. Wilson; and, in his affidavit, Exhibit 5, Respondent acknowledged he had "helped out" Oden several times, that he was paid by Oden for work Respondent did on the premises, that payment for this work was made out to J & J Building Company, and that he supervised the work when he was on the premises.