Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
BOARD OF NURSING vs. DAVID BROWN, 82-002507 (1982)
Division of Administrative Hearings, Florida Number: 82-002507 Latest Update: Apr. 15, 1983

Findings Of Fact David W. Brown, Respondent, is a registered nurse and was so registered at all times here relevant. During the period 1978-1982, Respondent was employed at St. Augustine General Hospital, St. Johns Psychiatric Hospital, in Jacksonville, Florida, and Hodges Boulevard Cluster as a registered nurse. During his tour at St. Johns Psychiatric Hospital and Hodges Boulevard Cluster, Respondent served as night nurse (11-7 shift). While at St. Johns, Respondent, while attempting to draw blood from an elderly male patient, was struck in the eye by this patient. In retaliation, Respondent grabbed the patient's index finger and bent it back. On another occasion when he refused a female patient in restraints something to drink and she spat on him, Respondent slapped her. When a 16-year old female patient complained to a nurse's aid that Respondent had fondled her breasts, he directed the aide not to chart the event. Respondent's testimony, that he told the aide to take her instructions on charting the incident from the charge nurse who investigated the incident, is not credible. On several occasions, Respondent, a martial arts buff, brought some of his martial arts equipment to the hospital and showed it to other staff members. This consisted of throwing stars, numchucks and knives. Respondent admitted bringing this equipment to the hospital and showing it to staff members but he denies throwing the pointed stars into a door and contends it was another member of the staff who threw the stars at the door. Respondent, on several occasions, showed another male staff member various holds used in martial arts and occasionally refused to release them when they demanded to be released. This caused discomfort and considerable displeasure to those so treated. Respondent contends he only showed them these holds at their request. While demonstrating to a female aide certain pressure points in emergency treatment of chest injuries, Respondent placed his hand on the aide's breast. Respondent contends he was only showing the aide certain procedures at her request. The aide testified that thereafter she never let Respondent get within three feet of her. Several witnesses testified that Respondent made unprofessional comments to them about female patients such as "she has nice tits" as well as comments disparaging to blacks. One black witness testified she was not offended because she knew Respondent was joking when he made the comment. Several witnesses also testified that Respondent exhibited cruel and sadistic conduct toward patients; that he would arbitrarily refuse to give patients water, let them smoke, or leave their rooms; that he was rude to patients; he seemed to have no compassion for patients; and that these witnesses were uncomfortable around Respondent because of his demeaning manner. Working at Hodges Boulevard Cluster, Respondent became friendly with the nurse he relieved on the 3-11 shift and often when she left duty after being relieved, Respondent would walk her to her car in the parking lot and remain with her for up to one and a half hours before returning to his duty station. Respondent admitted walking the nurse to her car but contends this was done solely for the woman's protection; that he was responsible for the security of the establishment; and that, while outside, he made a security check around the grounds. On another occasion a car, which was not recognized by the personnel on duty, was noticed in the hospital parking lot late at night. As nurse in charge of the night shift, Respondent proceeded to investigate. He got in his car and drove to where the car was parked, got out carrying a pistol he kept in his car, pointed the gun at the strange car, and directed the occupants to get out. They were hospital employees who were off duty but who had not gone home. Respondent testified that he removed the clip from his gun before he got out of the car but doesn't remember why he did so. While Respondent was employed at St. Johns, a patient was in difficulty and an ambulance had already been called to take the patient to a medical hospital when Respondent came on duty. Earlier attempts to hydrate the elderly patient intravenously had been unsuccessful when the nurses couldn't get the smallest needle, suitable for passing intravenous fluids, into the patient's vein. At some additional discomfort to the patient, Respondent attempted to use a Jalco type device which held a larger needle than the butterfly the earlier shift had tried without success. Respondent contends that he was directed by his superior to help, that he was better qualified than those on the shift he was relieving, but admitted lack of success in getting the needle into the patient's vein. In 1976, while working at St. Augustine General Hospital, the medicine cart was opened without a key by Respondent. One witness testified Respondent admitted opening the medicine cart by using a case knife. Respondent testified someone else had opened the cart and he had repeated the process to demonstrate to his superiors how it could be done. While at St. Johns and at the Clusters, Respondent frequently carried a sheath knife while on duty. Some witnesses described the knife as a switchblade; however, Respondent testified it was an ordinary sheath knife with a blade less than four inches long and that it was used solely for opening boxes while taking inventory. In 1980, while employed at St. Johns Psychiatric Hospital, Respondent struck a juvenile patient who was violently resisting Respondent's attempt to medicate him, and his license was suspended for one month following an administrative hearing (Exhibit 1).

Florida Laws (1) 464.018
# 1
BAY CONVALESCENT CENTER vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 78-001089 (1978)
Division of Administrative Hearings, Florida Number: 78-001089 Latest Update: Mar. 05, 1979

Findings Of Fact In general, the posture of this case is as follows: The Petitioner is Bay Convalescent Center, Inc., a nursing home in Panama City, Florida, licensed by the Department of Health and Rehabilitative Services, the Respondent. Mrs. Lula Carroll was first admitted to the nursing home as a patient on December 20, 1973, at which timed she was eighty-eight (88) years old. She was a resident of the nursing home during the months of April and May, 1978, when severe bruises were noticed on her body and entered on the nursing home records on April 25. Subsequent to the original observation of bruises, a niece complained that Mrs. Carroll had bruises on parts of her body. The complaint reached the office of Licensure and Certification of the Department of Health and Rehabilitative Services. Respondent sent an employee on May 5, 1978, to investigate the complaint. Respondent found that Petitioner: "was negligent in that they failed to notify the attending physician" and "the record-keeping function was not consis- tent with the established and recognized standards in that personnel failed to exe- cute an incident report when the patient was found in an unusual condition." A fine of $500 was levied and the Petitioner requested an Administrative Hearing. The nurse's notes of April 25, 1978 indicate that: "Bruise area noted to pts. R. breast, ex- tending from the upper R. quadrant of chest and of R. breast. This was reported to the Director of Nursing, Mrs. Sanders." A further note stated, "bruised area black and red and R. breast and underarm." Mrs. Ruth Sanders, the Director of Nursing, observed the bruises on or about April 25, and reported them to Dr. Byron McCormick, a physician for Bay Convalescent Center, Inc. Dr. McCormick examined Mrs. Carroll, but made no notes and it is uncertain which day he was notified or examined the bruises on Mrs. Carroll because there is neither doctor or nursing home records as to the examination. Mrs. Carroll was taken to the Gulf Coast Community Hospital in Panama City by ambulance on April 27, 1978. She remained in the hospital from April 27, 1978 until May 2, 1978 and was then returned to the Bay Convalescent Center, Inc. A niece from out of state had been notified that Mrs. Carroll was being taken to the hospital and upon her arrival found that Mrs. Carroll had many deep bruises and some abrasions on her body. A complaint was made to Mrs. Grace Rickell, a social worker in Panama City, Florida, who notified the Department of Health and Rehabilitative Services, which sent an inspector, Hattie King, R.N., from Jacksonville to Panama City to examine Mrs. Carroll and investigate the complaint. Mrs. King arrived at the Petitioner nursing home on May 5, 1978, interviewed the staff and took photographs of the bruises on Mrs. Carroll. No evidence was submitted to show that the admission to the hospital was related to the bruises on the body of Mrs. Carroll, which were observed by Mrs. Sanders and Dr. McCormick and were indicated by the convalescent center records of April 25, 1978. The admission summary stated, "This 92 year old white female was trans- ferred by Bay Convalescent Nursing Center because of no blood pressure, fever and chills. Patient is unable to give any his- tory. It is known that she has organic brain syndrome with generalized arterio- sclerosis and had a CVA in the past." Upon release from the hospital the record on Mrs. Carroll stated, "gave us much difficulty in the hospital in that she was not cooperative, thrashed about and required restraints. She continued as she became more alert, to be irrational, uncooperative, requiring a Posey belt. We got to where we could fed her and returned her back to the Nursing Home. The observation of the bruises on Mrs. Carroll by her niece and the complaint that led to the investigation of Respondent was after Mrs. Carroll had been admitted to the hospital. The investigation by the Respondent was after Mrs. Carroll had been returned from the hospital to the Petitioner, Bay Convalescent Home, Inc. Mrs. Ruth Sanders, the Director of Nursing, testified that she observed the bruises on Mrs. Carroll, but did not feel the bruises or the condition of Mrs. Carroll required the immediate attention of a doctor. She informed the doctor at his next visit, which time period was not definitely established, but was after the time of the report on April 25, and before Mrs. Carroll was sent to the hospital. Mrs. Sanders did not know what had caused the bruises. Mrs. Sanders had not felt the bruises were sufficient to warrant an incident/accident report. Mrs. Sanders and a registered nurse, Mrs. Bruton, viewed the photographs taken on May 5, and testified that some of the bruises shown by the photographs were not there at the time Mrs. Sanders and Dr. McCormick had originally examined Mrs. Carroll. Dr. Byron McCormick testified that he examined Mrs. Carroll and tee bruises, although he had made no notes about her condition. Dr. McCormick did not know what had caused the bruises, but his testimony was that he did not feel the bruises warranted the preparation and filing of an "incident/accident report". He testified that the bruises could have been caused by restraint, by the Posey belt, by Mrs. Carroll thrashing about, or from the routine handling of her in and about her bed, inasmuch as she had fragile skin and a tendency to bruise. Mrs. Hattie King, who observed and examined Mrs. Carroll and took photographs of the bruises did not know how Mrs. Carroll was bruised, but it was her opinion that an incident report should have been filed. Mrs. Earline Gibbons, who examined Mrs. Carroll with Mrs. King and who aided Mrs. King in the taking of the photographs, testified that the bruises as shown by the photographs and on her examination had been sufficiently severe to warrant the immediate attention of a physician. The Hearing Officer further finds: The evidence shows that the patient, Mrs. Lula Carroll was severely bruised. There is no evidence to show bow Mrs. Carroll was bruised. The investigation by the Respondent was subsequent to the initial bruising and subse- quent to the release of the patient from the convalescent home to the hospital and the return to the convalescent home. There is no evidence to show that the patient was not additionally bruised subsequent to the bruises suffered in April and the time of the investigation on May 5th. Testimony of the Director of Nursing and the doctor who examined the patient was taken at the hearing and both of these witnesses called by the convalescent home testified that in their opinion, no incident report was required. There is no competent evidence to show that there was an accident or an incident.

Recommendation Dismiss the Administrative Complaint. DONE and ENTERED this 13th day of December, 1978, in Tallahassee, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Donna Stinson, Esquire 2639 North Monroe Street Suite 200-A Tallahassee, Florida Mr. William Riddle Administrator Bay Convalescent Center 1336 St. Andrews Boulevard Panama City, Florida 32401 Hon. Jerry W. Gerde 406 Magnolia Avenue Panama City, Florida

Florida Laws (2) 400.102400.121
# 2
MORTON PLANT HOSPITAL ASSOCIATION, INC., D/B/A NORTH BAY HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION AND NEW PORT RICHEY HOSPITAL, INC., D/B/A COMMUNITY HOSPITAL OF NEW PORT RICHEY, 02-003515CON (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Sep. 10, 2002 Number: 02-003515CON Latest Update: May 17, 2004

The Issue Whether the certificate of need (CON) applications filed by New Port Richey Hospital, Inc., d/b/a Community Hospital of New Port Richey (Community Hospital) (CON No. 9539), and Morton Plant Hospital Association, Inc., d/b/a North Bay Hospital (North Bay) (CON No. 9538), each seeking to replace and relocate their respective general acute care hospital, satisfy, on balance, the applicable statutory and rule criteria.

Findings Of Fact The Parties AHCA AHCA is the single state agency responsible for the administration of the CON program in Florida pursuant to Chapter 408, Florida Statutes (2000). The agency separately reviewed and preliminarily approved both applications. Community Hospital Community Hospital is a 300,000 square feet, accredited hospital with 345 licensed acute care beds and 56 licensed adult psychiatric beds, located in southern New Port Richey, Florida, within Sub-District 5-1. Community Hospital is seeking to construct a replacement facility approximately five miles to the southeast within a rapidly developing suburb known as "Trinity." Community Hospital currently provides a wide array of comprehensive inpatient and outpatient services and is the only provider of obstetrical and adult psychiatric services in Sub-District 5-1. It is the largest provider of emergency services in Pasco County with approximately 35,000 visits annually. It is also the largest provider of Medicaid and indigent patient days in Sub-District 5-1. Community Hospital was originally built in 1969 and is an aging facility. Although it has been renovated over time, the hospital is in poor condition. Community Hospital's average daily census is below 50 percent. North Bay North Bay is a 122-bed facility containing 102 licensed acute care beds and 20 licensed comprehensive medical rehabilitation beds, located approximately one mile north of Community Hospital in Sub-District 5-1. It serves a large elderly population and does not provide pediatric or obstetrical care. North Bay is also an aging facility and proposes to construct a replacement facility in the Trinity area. Notably, however, North Bay has spent approximately 12 million dollars over the past three years for physical improvements and is in reasonable physical condition. Helen Ellis Helen Ellis is an accredited hospital with 150 licensed acute care beds and 18 licensed skilled nursing unit beds. It is located in northern Pinellas County, approximately eight miles south of Community Hospital and nine miles south of North Bay. Helen Ellis provides a full array of acute care services including obstetrics and cardiac catheterization. Its daily census average has fluctuated over the years but is approximately 45 percent. Mease Mease operates two acute care hospitals in Pinellas County including Mease Dunedin Hospital, located approximately 18 to 20 miles south of the applicants and Mease Countryside Hospital, located approximately 16 to 18 miles south of Community and North Bay. Each hospital operates 189 licensed beds. The Mease hospitals are located in the adjacent acute care sub-district but compete with the applicants. The Health Planning District AHCA's Health Planning District 5 consists of Pinellas and Pasco Counties. U.S. Highway 41 runs north and south through the District and splits Pasco County into Sub- District 5-1 and Sub-District 5-2. Sub-District 5-1, where Community Hospital and North Bay are located, extends from U.S. 41 west to the Gulf Coast. Sub-District 5-2 extends from U.S. 41 to the eastern edge of Pasco County. Pinellas County is the most densely populated county in Florida and steadily grows at 5.52 percent per year. On the other hand, its neighbor to the north, Pasco County, has been experiencing over 15 percent annual growth in population. The evidence demonstrates that the area known as Trinity, located four to five miles southeast of New Port Richey, is largely responsible for the growth. With its large, single- owner land tracts, Trinity has become the area's fuel for growth, while New Port Richey, the older coastal anchor which houses the applicants' facilities, remains static. In addition to the available land in Trinity, roadway development in the southwest section of Pasco County is further fueling growth. For example, the Suncoast Highway, a major highway, was recently extended north from Hillsborough County through Sub-District 5-1, west of U.S. 41. It intersects with several large east-west thoroughfares including State Road 54, providing easy highway access to the Tampa area. The General Proposals Community Hospital's Proposal Community Hospital's CON application proposes to replace its existing, 401-bed hospital with a 376-bed state- of-the-art facility and relocate it approximately five miles to the southeast in the Trinity area. Community Hospital intends to construct a large medical office adjacent to its new facility and provide all of its current services including obstetrical care. It does not intend to change its primary service area. North Bay's Proposal North Bay's CON application proposes to replace its existing hospital with a 122-bed state-of-the-art facility and also plans to relocate it approximately eight miles to the southeast in the Trinity area of southwestern Pasco County. North Bay intends to provide the same array of services it currently offers its patients and will not provide pediatric and obstetrical care in the proposed facility. The proposed relocation site is adjacent to the Trinity Outpatient Center which is owned by North Bay's parent company, Morton Plant. The Outpatient Center offers a full range of diagnostic imaging services including nuclear medicine, cardiac nuclear stress testing, bone density scanning, CAT scanning, mammography, ultrasound, as well as many others. It also offers general and specialty ambulatory surgical services including urology; ear, nose and throat; ophthalmology; gastroenterology; endoscopy; and pain management. Approximately 14 physician offices are currently located at the Trinity Outpatient Center. The Condition of Community Hospital Facility Community Hospital's core facilities were constructed between 1969 and 1971. Additions to the hospital were made in 1973, 1975, 1976, 1977, 1979, 1981, 1992, and 1999. With an area of approximately 294,000 square feet and 401 licensed beds, or 733 square feet per bed, Community Hospital's gross area-to-bed ratio is approximately half of current hospital planning standards of 1,600 square feet per bed. With the exception of the "E" wing which was completed in 1999, all of the clinical and support departments are undersized. Medical-Surgical Beds And Intensive Care Units Community Hospital's "D" wing, constructed in 1975, is made up of two general medical-surgical unit floors which are grossly undersized. Each floor operates 47 general medical-surgical beds, 24 of which are in three-bed wards and 23 in semi-private rooms. None of the patient rooms in the "D" wing have showers or tubs so the patients bathe in a single facility located at the center of the wing on each floor. Community Hospital's "A" wing, added in 1973, is situated at the west end of the second floor and is also undersized. It too has a combination of semi-private rooms and three-bed wards without showers or tubs. Community Hospital's "F" wing, added in 1979, includes a medical-surgical unit on the second and third floor, each with semi-private and private rooms. The second floor unit is centrally located between a 56-bed adult psychiatric unit and the Surgical Intensive Care Unit (SICU) which creates security and privacy issues. The third floor unit is adjacent to the Medical Intensive Care Unit (MICU) which must be accessed through the medical-surgical unit. Neither intensive care unit (ICU) possesses an isolation area. Although the three-bed wards are generally restricted to in-season use, and not always full, they pose significant privacy, security, safety, and health concerns. They fail to meet minimum space requirements and are a serious health risk. The evidence demonstrates that reconfiguring the wards would be extremely costly and impractical due to code compliance issues. The wards hinder the hospital's acute care utilization, and impair its ability to effectively compete with other hospitals. Surgical Department and Recovery Community Hospital's surgical department is separated into two locations including the main surgical suite on the second floor and the Endoscopy/Pain Management unit located on the first floor of "C" wing. Consequently, the department cannot share support staff and space such as preparation and recovery. The main surgical suite, adjacent recovery room, and central sterile processing are 25 years old. This unit's operating rooms, cystoscopy rooms, storage areas, work- stations, central sterile, and recovery rooms are undersized and antiquated. The 12-bay Recovery Room has no patient toilet and is lacking storage. The soiled utility room is deficient. In addition, the patient bays are extremely narrow and separated by curtains. There is no direct connection to the sterile corridor, and staff must break the sterile field to transport patients from surgery to recovery. Moreover, surgery outpatients must pass through a major public lobby going to and returning from surgery. The Emergency Department Community Hospital's existing emergency department was constructed in 1992 and is the largest provider of hospital emergency services in Pasco County, handling approximately 35,000 visits per year. The hospital is also designated a "Baker Act" receiving facility under Chapter 394, Florida Statutes, and utilizes two secure examination rooms for emergent psychiatric patients. At less than 8,000 total square feet, the emergency department is severely undersized to meet the needs of its patients. The emergency department is currently undergoing renovation which will connect the triage area to the main emergency department. The renovation will not enlarge the entrance, waiting area, storage, nursing station, nor add privacy to the patient care areas in the emergency department. The renovation will not increase the total size of the emergency department, but in fact, the department's total bed availability will decrease by five beds. Similar to other departments, a more meaningful renovation cannot occur within the emergency department without triggering costly building code compliance measures. In addition to its space limitations, the emergency department is awkwardly located. In 1992, the emergency department was relocated to the front of the hospital and is completely separated from the diagnostic imaging department which remained in the original 1971 building. Consequently, emergency patients are routinely transported across the hospital for imaging and CT scans. Issues Relating to Replacement of Community Hospital Although physically possible, renovating and expanding Community Hospital's existing facility is unreasonable. First, it is cost prohibitive. Any significant renovation to the 1971, 1975, 1977, and 1979 structures would require asbestos abatement prior to construction, at an estimated cost of $1,000,000. In addition, as previously noted, the hospital will be saddled with the major expense of complying with all current building code requirements in the 40-year-old facility. Merely installing showers in patient rooms would immediately trigger a host of expensive, albeit necessary, code requirements involving access, wiring, square footage, fireproofing columns and beams, as well as floor/ceiling and roof/ceiling assemblies. Concurrent with the significant demolition and construction costs, the hospital will experience the incalculable expense and loss of revenue related to closing major portions, if not all, of the hospital. Second, renovation and expansion to the existing facility is an unreasonable option due to its physical restrictions. The 12'4" height of the hospital's first floor limits its ability to accommodate HVAC ductwork large enough to meet current ventilation requirements. In addition, there is inadequate space to expand any department within the confines of the existing hospital without cannibalizing adjacent areas, and vertical expansion is not an option. Community Hospital's application includes a lengthy Facility Condition Assessment which factually details the architectural, mechanical, and electrical deficiencies of the hospital's existing physical plant. The assessment is accurate and reasonable. Community Hospital's Proposed Replacement Community Hospital proposes to construct a six- story, 320 licensed beds, acute care replacement facility. The hospital will consist of 548,995 gross square feet and include a 56-bed adult psychiatric unit connected by a hallway to the first floor of the main hospital building. The proposal also includes the construction of an adjacent medical office building to centralize the outpatient offices and staff physicians. The evidence establishes that the deficiencies inherent in Community Hospital's existing hospital will be cured by its replacement hospital. All patients will be provided large private rooms. The emergency department will double in size, and contain private examination rooms. All building code requirements will be met or exceeded. Patients and staff will have separate elevators from the public. In addition, the surgical department will have large operating rooms, and adequate storage. The MICU and SICU will be adjacent to each other on the second floor to avoid unnecessary traffic within the hospital. Surgical patients will be transported to the ICU via a private elevator dedicated to that purpose. Medical-surgical patient rooms will be efficiently located on the third through sixth floors, in "double-T" configuration. Community Hospital's Existing and Proposed Sites Community Hospital is currently located on a 23-acre site inside the southern boundary of New Port Richey. Single- family homes and offices occupy the two-lane residential streets that surround the site on all sides. The hospital buildings are situated on the northern half of the site, with the main parking lot located to the south, in front of the main entrance to the hospital. Marine Parkway cuts through the southern half of the site from the west, and enters the main parking lot. A private medical mall sits immediately to the west of the main parking lot and a one-acre storm-water retention pond sits to the west of the mall. A private medical office building occupies the south end of the main parking lot and a four-acre drainage easement is located in the southwest corner of the site. Community Hospital's administration has actively analyzed its existing site, aging facility, and adjacent areas. It has commissioned studies by civil engineers, health care consultants, and architects. The collective evidence demonstrates that, although on-site relocation is potentially an option, on balance, it is not a reasonable option. Replacing Community Hospital on its existing site is not practical for several reasons. First, the hospital will experience significant disruption and may be required to completely close down for a period of time. Second, the site's southwestern large four-acre parcel is necessary for storm-water retention and is unavailable for expansion. Third, a reliable cost differential is unknown given Community Hospital's inability to successfully negotiate with the city and owners of the adjacent medical office complexes to acquire additional parcels. Fourth, acquiring other adjacent properties is not a viable option since they consist of individually owned residential lots. In addition to the site's physical restrictions, the site is hindered by its location. The hospital is situated in a neighborhood between small streets and a local school. From the north and south, motorists utilize either U.S. 19, a congested corridor that accommodates approximately 50,000 vehicles per day, or Grand and Madison Streets, two-lane streets within a school zone. From the east and west, motorists utilize similar two-lane neighborhood streets including Marine Parkway, which often floods in heavy rains. Community Hospital's proposed site, on the other hand, is a 53-acre tract positioned five miles from its current facility, at the intersection of two major thoroughfares in southwestern Pasco County. The proposed site offers ample space for all facilities, parking, outpatient care, and future expansion. In addition, Community Hospital's proposed site provides reasonable access to all patients within its existing primary service area made up of zip codes 34652, 34653, 34668, 34655, 34690, and 34691. For example, the average drive times from the population centers of each zip code to the existing site of the hospital and the proposed site are as follows: Zip code Difference Existing site Proposed site 34652 3 minutes 14 minutes 11 minutes 34653 8 minutes 11 minutes 3 minutes 34668 15 minutes 21 minutes 6 minutes 34655 11 minutes 4 minutes -7 minutes 34690 11 minutes 13 minutes 2 minutes 34691 11 minutes 17 minutes 6 minutes While the average drive time from the population centroids of zip codes 34653, 34668, 34690, and 34691 to the proposed site slightly increases, it decreases from the Trinity area, where population growth has been most significant in southwestern Pasco County. In addition, a motorist's average drive time from Community Hospital's existing location to its proposed site is only 10 to 11 minutes, and patients utilizing public transportation will be able to access the new hospital via a bus stop located adjacent to the proposed site. The Condition of North Bay Facility North Bay Hospital is also an aging facility. Its original structure and portions of its physical plant are approximately 30 years old. Portions of its major mechanical systems will soon require replacement including its boilers, air handlers, and chillers. In addition, the hospital is undersized and awkwardly configured. Despite its shortcomings, however, North Bay is generally in good condition. The hospital has been consistently renovated and updated over time and is aesthetically pleasing. Moreover, its second and third floors were added in 1986, are in good shape, and structurally capable of vertical expansion. Medical Surgical Beds and ICU Units By-in-large, North Bay is comprised of undersized, semi-private rooms containing toilet and shower facilities. The hospital does not have any three-bed wards. North Bay's first floor houses all ancillary and support services including lab, radiology, pharmacy, surgery, pre-op, post-anesthesia recovery, central sterile processing and supply, kitchen and cafeteria, housekeeping and administration, as well as the mechanical, electrical, and facilities maintenance and engineering. The first floor also contains a 20-bed CMR unit and a 15-bed acute care unit. North Bay's second and third floors are mostly comprised of semi-private rooms and supporting nursing stations. Although the rooms and stations are not ideally sized, they are in relatively good shape. North Bay utilizes a single ICU with ten critical care beds. The ICU rooms and nursing stations are also undersized. A four-bed ICU ward and former nursery are routinely used to serve overflow patients. Surgery Department and Recovery North Bay utilizes a single pre-operative surgical room for all of its surgery patients. The room accommodates up to five patient beds, but has limited space for storage and pre-operative procedures. Its operating rooms are sufficiently sized. While carts and large equipment are routinely stored in hallways throughout the surgical suite, North Bay has converted the former obstetrics recovery room to surgical storage and has made efficient use of other available space. North Bay operates a small six-bed Post Anesthesia Care Unit. Nurses routinely prepare patient medications in the unit which is often crowded with staff and patients. The Emergency Department North Bay has recently expanded its emergency department. The evidence demonstrates that this department is sufficient and meets current and future expected patient volumes. Replacement Issues Relating to North Bay While it is clear that areas of North Bay's physical plant are aging, the facility is in relatively good condition. It is apparent that North Bay must soon replace significant equipment, including cast-iron sewer pipes, plumbing, boilers, and chillers which will cause some interruption to hospital operations. However, North Bay's four-page written assessment of the facility and its argument citing the need for total replacement is, on balance, not persuasive. North Bay's Proposed Replacement North Bay proposes to construct a new, state-of-the- art, hospital approximately eight miles southeast of its existing facility and intends to offer the identical array of services the hospital currently provides. North Bay's Existing and Proposed Sites North Bay's existing hospital is located on an eight-acre site with limited storm-water drainage capacity. Consequently, much of its parking area is covered by deep, porous, gravel instead of asphalt. North Bay's existing site is generally surrounded by residential properties. While the city has committed, in writing, it willingness to assist both applicants with on-site expansion, it is unknown whether North Bay can acquire additional adjacent property. North Bay's proposed site is located at the intersection of Trinity Oaks Boulevard and Mitchell Boulevard, south of Community Hospital's proposed site, and is quite spacious. It contains sufficient land for the facilities, parking, and future growth, and has all necessary infrastructure in place, including utility systems, storm- water structures, and roadways. Currently however, there is no public transportation service available to North Bay's proposed site. Projected Utilization by Applicants The evidence presented at hearing indicates that, statewide, replacement hospitals often increase a provider's acute care bed utilization. For example, Bartow Memorial Hospital, Heart of Florida Regional Medical Center, Lake City Medical Center, Florida Hospital Heartland Medical Center, South Lake Hospital, and Florida Hospital-Fish Memorial each experienced significant increases in utilization following the opening of their new hospital. The applicants in this case each project an increase in utilization following the construction of their new facility. Specifically, Community Hospital's application projects 82,685 total hospital patient days (64,427 acute care patient days) in year one (2006) of the operation of its proposed replacement facility, and 86,201 total hospital patient days (67,648 acute care patient days) in year two (2007). Using projected 2006 and 2007 population estimates, applying 2002 acute care hospital use rates which are below 50 percent, and keeping Community Hospital's acute care market share constant at its 2002 level, it is reasonably estimated that Community Hospital's existing hospital will experience 52,623 acute care patient days in 2006, and 53,451 acute care patient days in 2007. Consequently, Community Hospital's proposed facility must attain 11,804 additional acute care patient days in 2006, and 14,197 more acute care patient days in 2007, in order to achieve its projected acute care utilization. Although Community Hospital lost eight percent of the acute care market in its service area between 1995 and 2002, two-thirds of that loss was due to residents of Sub- District 5-1 acquiring services in another area. While Community Hospital experienced 78,444 acute care patient days in 1995, it projects only 64,427 acute care patient days in year one. Given the new facility and population factors, it is reasonable that the hospital will recapture half of its lost acute care market share and achieve its projections. With respect to its psychiatric unit, Community Hospital projects 16,615 adult psychiatric inpatient days in year one (2006) and 17,069 adult inpatient days in year two (2007) of the proposed replacement hospital. The evidence indicates that these projections are reasonable. Similarly, North Bay's acute care utilization rate has been consistently below 50 percent. Since 1999, the hospital has experienced declining utilization. In its application, North Bay states that it achieved total actual acute care patient days of 21,925 in 2000 and 19,824 in 2001 and the evidence at hearing indicates that North Bay experienced 17,693 total acute care patient days in 2002. North Bay projects 25,909 acute care patient days in the first year of operation of its proposed replacement hospital, and 27,334 acute care patient days in the second year of operation. Despite each applicant's current facility utilization rate, Community Hospital must increase its current acute care patient days by 20 percent to reach its projected utilization, and North Bay must increase its patient days by at least 50 percent. Given the population trends, service mix and existing competition, the evidence demonstrates that it is not possible for both applicants to simultaneously achieve their projections. In fact, it is strongly noted that the applicants' own projections are predicated upon only one applicant being approved and cannot be supported with the approval of two facilities. Local Health Plan Preferences In its local health plan for District 5, the Suncoast Health Council, Inc., adopted acute care preferences in October, 2000. The replacement of an existing hospital is not specifically addressed by any of the preferences. However, certain acute care preferences and specialty care preferences are applicable. The first applicable preference provides that preference "shall be given to an applicant who proposes to locate a new facility in an area that will improve access for Medicaid and indigent patients." It is clear that the majority of Medicaid and indigent patients live closer to the existing hospitals. However, Community Hospital proposes to move 5.5 miles from its current location, whereas North Bay proposes to move eight miles from its current location. While the short distances alone are less than significant, North Bay's proposed location is further removed from New Port Richey, is not located on a major highway or bus-route, and would therefore be less accessible to the medically indigent residents. Community Hospital's proposed site will be accessible using public transportation. Furthermore, Community Hospital has consistently provided excellent service to the medically indigent and its proposal would better serve that population. In 2000, Community Hospital provided 7.4 percent of its total patient days to Medicaid patients and 0.8 percent of its total patient days to charity patients. Community Hospital provided the highest percentage and greatest number of Medicaid patient days in Sub-District 5-1. By comparison, North Bay provided 5.8 percent of its total patient days to Medicaid patients and 0.9 percent of its total patient days to charity patients. In 2002, North Bay's Medicaid patients days declined to 3.56 percent. Finally, given the closeness and available bed space of the existing providers and the increasing population in the Trinity area, access will be improved by Community Hospital's relocation. The second local health plan preference provides that "[i]n cases where an applicant is a corporation with previously awarded certificates of need, preference shall be given to those which follow through in a timely manner to construct and operate the additional facilities or beds and do not use them for later negotiations with other organizations seeking to enter or expand the number of beds they own or control." Both applicants meet this preference. The third local health plan preference recognizes "Certificate of Need applications that provide AHCA with documentation that they provide, or propose to provide, the largest percentage of Medicaid and charity care patient days in relation to other hospitals in the sub-district." Community Hospital provides the largest percentage of Medicaid and charity care patient days in relation to other hospitals in Sub-District 5-1, and therefore meets this preference. The fourth local health plan preference applies to "Certificate of Need applications that demonstrate intent to serve HIV/AIDS infected persons." Both applicants accept and treat HIV/AIDS infected persons, and would continue to do so in their proposed replacement hospitals. The fifth local health plan preference recognizes "Certificate of Need applications that commit to provide a full array of acute care services including medical-surgical, intensive care, pediatric, and obstetrical services within the sub-district for which they are applying." Community Hospital qualifies since it will continue to provide its current services, including obstetrical care and psychiatric care, in its proposed replacement hospital. North Bay discontinued its pediatric and obstetrical programs in 2001, does not intend to provide them in its proposed replacement hospital, and will not provide psychiatric care. Agency Rule Preferences Florida Administrative Code Rule 59C-1.038(6) provides an applicable preference to a facility proposing "new acute care services and capital expenditures" that has "a documented history of providing services to medically indigent patients or a commitment to do so." As the largest Medicaid provider in Sub-District 5-1, Community Hospital meets this preference better than does North Bay. North Bay's history demonstrates a declining rate of service to the medically indigent. Statutory Review Criteria Section 408.035(1), Florida Statutes: The need for the health care facilities and health services being proposed in relation to the applicable district health plan District 5 includes Pasco and Pinellas County. Pasco County is rapidly developing, whereas Pinellas County is the most densely populated county in Florida. Given the population trends, service mix, and utilization rates of the existing providers, on balance, there is a need for a replacement hospital in the Trinity area. Section 408.035(2), Florida Statutes: The availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district of the applicant Community Hospital and North Bay are both located in Sub-District 5-1. Each proposes to relocate to an area of southwestern Pasco County which is experiencing explosive population growth. The other general acute care hospital located in Sub-District 5-1 is Regional Medical Center Bayonet Point, which is located further north, in the Hudson area of western Pasco County. The only other acute care hospitals in Pasco County are East Pasco Medical Center, in Zephyrhills, and Pasco Community Hospital, in Dade City. Those hospitals are located in Sub-District 5-2, east Pasco County, far from the area proposed to be served by either Community Hospital or North Bay. District 5 includes Pinellas County as well as Pasco County. Helen Ellis and Mease are existing hospital providers located in Pinellas County. Helen Ellis has 168 licensed beds, consisting of 150 acute care beds and an 18-bed skilled nursing unit, and is located 7.9 miles from Community Hospital's existing location and 10.8 miles from Community Hospital's proposed location. Access to Helen Ellis for patients originating from southwestern Pasco County requires those patients to travel congested U.S. 19 south to Tarpon Springs. As a result, the average drive time from Community Hospital's existing and proposed site to Helen Ellis is approximately 22 minutes. Helen Ellis is not a reasonable alternative to Community Hospital's proposal. The applicants' proposals are specifically designed for the current and future health care needs of southwestern Pasco County. Given its financial history, it is unknown whether Helen Ellis will be financially capable of providing the necessary care to the residents of southwestern Pasco. Mease Countryside Hospital has 189 licensed acute care beds. It is located 16.0 miles from Community Hospital's existing location and 13.8 miles from Community Hospital's proposed location. The average drive time to Mease Countryside is 32 minutes from Community Hospital's existing site and 24 minutes from its proposed site. In addition, Mease Countryside Hospital has experienced extremely high utilization over the past several years, in excess of 90 percent for calendar years 2000 and 2001. Utilization at Mease Countryside Hospital has remained over 80 percent despite the addition of 45 acute care beds in April 2002. Given the growth and demand, it is unknown whether Mease can accommodate the residents in southwest Pasco County. Mease Dunedin Hospital has 189 licensed beds, consisting of 149 acute care beds, a 30-bed skilled nursing unit, five Level 2 neonatal intensive care beds, and five Level 3 neonatal intensive care beds. Its former 15-bed adult psychiatric unit has been converted into acute care beds. It is transferring its entire obstetrics program at Mease Dunedin Hospital to Mease Countryside Hospital. Mease Dunedin Hospital is located approximately 18 to 20 miles from the applicants' existing and proposed locations with an average drive time of 35-38 minutes. With their remote location, and the exceedingly high utilization at Mease Countryside Hospital, neither of the two Mease hospitals is a viable alternative to the applicants' proposals. In addition, the construction of a replacement hospital would positively impact economic development and further attract medical professionals to Sub-District 5-1. On balance, given the proximity, utilization, service array, and accessibility of the existing providers, including the applicants, the relocation of Community Hospital will enhance access to health care to the residents. Section 408.035(3), Florida Statutes: The ability of the applicant to provide quality of care and the applicant's record of providing quality of care As stipulated, both applicants provide excellent quality of care. However, Community Hospital's proposal will better enhance its ability to provide quality care. Community is currently undersized, non-compliant with today's standards, and located on a site that does not allow for reasonable expansion. Its emergency department is inadequate for patient volume, and the configuration of the first floor leads to inefficiencies in the diagnosis and treatment of emergency patients. Again, most inpatients are placed in semi-private rooms and three-bed wards, with no showers or tubs, little privacy, and an increased risk of infection. The hospital's waiting areas for families of patients are antiquated and undersized, its nursing stations are small and cramped and the operating rooms and storage facilities are undersized. Community Hospital's deficiencies will be effectively eliminated by its proposed replacement hospital. As a result, patients will experience qualitatively better care by the staff who serve them. Conversely, North Bay is in better physical condition and not in need of replacement. It has more reasonable options to expand or relocate its facility on site. Quality of care at North Bay will not be markedly enhanced by the construction of a new hospital. Sections 408.035(4)and(5), Florida Statutes, have been stipulated as not applicable in this case. Section 408.035(6), Florida Statutes: The availability of resources, including health personnel, management personnel, and funds available for capital and operating expenditures, for project accomplishment and operation The parties stipulated that both Community Hospital and North Bay have available health personnel and management personnel for project accomplishment and operation. In addition, the evidence proves that both applicants have sufficient funds for capital and operating expenditures. Community Hospital proposes to rely on its parent company to finance the project. Keith Giger, Vice-President of Finance for HCA, Inc., Community Hospital's parent organization, provided credible deposition testimony that HCA, Inc., will finance 100 percent of the total project cost by an inter-company loan at eight percent interest. Moreover, it is noted that the amount to be financed is actually $20 million less than the $196,849,328 stated in the CON Application, since Community Hospital previously purchased the proposed site in June 2003 with existing funds and does not need to finance the land acquisition. Community Hospital has sufficient working capital for operating expenditures of the proposed replacement hospital. North Bay, on the other hand, proposes to acquire financing from BayCare Obligated Group which includes Morton Plant Hospital Association, Inc.; Mease; and several other hospital entities. Its proposal, while feasible, is less certain since member hospitals must approve the indebtedness, thereby providing Mease with the ability to derail North Bay's proposed bond financing. Section 408.035(7), Florida Statutes: The extent to which the proposed services will enhance access to health care for residents of the service district The evidence proves that either proposal will enhance geographical access to the growing population in the service district. However, with its provision of obstetrical services, Community Hospital is better suited to address the needs of the younger community. With respect to financial access, both proposed relocation sites are slightly farther away from the higher elderly and indigent population centers. Since the evidence demonstrates that it is unreasonable to relocate both facilities away from the down-town area, Community Hospital's proposal, on balance, provides better access to poor patients. First, public transportation will be available to Community Hospital's site. Second, Community Hospital has an excellent record of providing care to the poor and indigent and has accepted the agency's condition to provide ten percent of its total annual patient days to Medicaid recipients To the contrary, North Bay's site will not be accessible by public transportation. In addition, North Bay has a less impressive record of providing care to the poor and indigent. Although AHCA conditioned North Bay's approval upon it providing 9.7 percent of total annual patient days to Medicaid and charity patients, instead of the 9.7 percent of gross annual revenue proposed in its application, North Bay has consistently provided Medicaid and charity patients less than seven percent of its total annual patient days. Section 408.035(8), Florida Statutes: The immediate and long-term financial feasibility of the proposal Immediate financial feasibility refers to the availability of funds to capitalize and operate the proposal. See Memorial Healthcare Group, Ltd. d/b/a Memorial Hospital Jacksonville vs. AHCA et al., Case No. 02-0447 et seq. Community Hospital has acquired reliable financing for the project and has sufficiently demonstrated that its project is immediately financially feasible. North Bay's short-term financial proposal is less secure. As noted, North Bay intends to acquire financing from BayCare Obligated Group. As a member of the group, Mease, the parent company of two hospitals that oppose North Bay's application, must approve the plan. Long-term financial feasibility is the ability of the project to reach a break-even point within a reasonable period of time and at a reasonable achievable point in the future. Big Bend Hospice, Inc. vs. AHCA and Covenant Hospice, Inc., Case No. 02-0455. Although CON pro forma financial schedules typically show profitability within two to three years of operation, it is not a requirement. In fact, in some circumstances, such as the case of a replacement hospital, it may be unrealistic for the proposal to project profitability before the third or fourth year of operation. In this case, Community Hospital's utilization projections, gross and net revenues, and expense figures are reasonable. The evidence reliably demonstrates that its replacement hospital will be profitable by the fourth year of operation. The hospital's financial projections are further supported by credible evidence, including the fact that the hospital experienced financial improvement in 2002 despite its poor physical condition, declining utilization, and lost market share to providers outside of its district. In addition, the development and population trends in the Trinity area support the need for a replacement hospital in the area. Also, Community Hospital has benefited from increases in its Medicaid per diem and renegotiated managed care contracts. North Bay's long-term financial feasibility of its proposal is less certain. In calendar year 2001, North Bay incurred an operating loss of $306,000. In calendar year 2002, it incurred a loss of $1,160,000. In its CON application, however, North Bay projects operating income of $1,538,827 in 2007, yet omitted the ongoing expenses of interest ($1,600,000) and depreciation ($3,000,000) from its existing facility that North Bay intends to continue operating. Since North Bay's proposal does not project beyond year two, it is less certain whether it is financially feasible in the third or fourth year. In addition to the interest and depreciation issues, North Bay's utilization projections are less reasonable than Community Hospital's proposal. While possible, North Bay will have a difficult task achieving its projected 55 percent increase in acute care patient days in its second year of operation given its declining utilization, loss of obstetric/pediatric services and termination of two exclusive managed care contracts. Section 408.035(9), Florida Statutes: The extent to which the proposal will foster competition that promotes quality and cost-effectiveness Both applicants have substantial unused capacity. However, Community Hospital's existing facility is at a distinct competitive disadvantage in the market place. In fact, from 1994 to 1998, Community Hospital's overall market share in its service area declined from 40.3 percent to 35.3 percent. During that same period, Helen Ellis' overall market share in Community Hospital's service area increased from 7.2 percent to 9.2 percent. From 1995 to the 12-month period ending June 30, 2002, Community Hospital's acute care market share in its service area declined from 34.0 percent to 25.9 percent. During that same period, Helen Ellis' acute care market share in Community Hospital's service area increased from 11.7 percent to 12.0 percent. In addition, acute care average occupancy rates at Mease Dunedin Hospital increased each year from 1999 through 2002. Acute care average occupancy at Mease Countryside Hospital exceeded 90 percent in 2000 and 2001, and was approximately 85 percent for the period ending June 30, 2002. Some of the loss in Community Hospital's market share is due to an out-migration of patients from its service area to hospitals in northern Pinellas and Hillsborough Counties. Market share in Community's service area by out-of- market providers increased from 33 percent in 1995 to 40 percent in 2002. Community Hospital's outdated hospital has hampered its ability to compete for patients in its service area. Mease is increasing its efforts to attract patients and currently completing a $92 million expansion of Mease Countryside Hospital. The project includes the development of 1,134 parking spaces on 30 acres of raw land north of the Mease Countryside Hospital campus and the addition of two floors to the hospital. It also involves the relocation of 51 acute care beds, the obstetrics program and the Neonatal Intensive Care Units from Mease Dunedin Hosptial to Mease Countryside Hospital. Mease is also seeking to more than double the size of the Countryside emergency department to handle its 62,000 emergency visits. With the transfer of licensed beds from Mease Dunedin Hospital to Mease Countryside Hospital, Mease will also convert formerly semi-private patient rooms to private rooms at Mease Dunedin Hospital. The approval of Community Hospital's relocated facility will enable it to better compete with the hospitals in the area and promote quality and cost- effectiveness. North Bay, on the other hand, is not operating at a distinct disadvantage, yet is still experiencing declining utilization. North Bay is the only community-owned, not-for- profit provider in western Pasco County and is a valuable asset to the city. Section 408.035(10), Florida Statutes: The costs and methods of the proposed construction, including the costs and methods or energy provision and the availability of alternative, less costly, or more effective methods of construction The parties stipulated that the project costs in both applications are reasonable to construct the replacement hospitals. Community Hospital's proposed construction cost per square foot is $175, and slightly less than North Bay's $178 proposal. The costs and methods of proposed construction for each proposal is reasonable. Given Community Hospital's severe site and facility problems, the evidence demonstrates that there is no reasonable, less costly, or more effective methods of construction available for its proposed replacement hospital. Additional "band-aide" approaches are not financially reasonable and will not enable Community Hospital to effectively compete. The facility is currently licensed for 401 beds, operates approximately 311 beds and is still undersized. The proposed replacement hospital will meet the standards in Florida Administrative Code Rule 59A-3.081, and will meet current building codes, including the Americans with Disabilities Act and the Guidelines for Design and Construction of Hospitals and Health Care Facilities, developed by the American Institute of Architects. The opponents' argue that Community Hospital will not utilize the 320 acute care beds proposed in its CON application, and therefore, a smaller facility is a less- costly alternative. In addition, Helen Ellis' architectural expert witness provided schematic design alternatives for Community Hospital to be expanded and replaced on-site, without providing a detailed and credible cost accounting of the alternatives. Given the evidence and the law, their arguments are not persuasive. While North Bay's replacement cost figures are reasonable, given the aforementioned reasons, including the fact that the facility is in reasonably good condition and can expand vertically, on balance, it is unreasonable for North Bay to construct a replacement facility in the Trinity area. Section 408.035(11), Florida Statutes: The applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent Community Hospital has consistently provided the most health care services to Medicaid patients and the medically indigent in Sub-District 5-1. Community Hospital agreed to provide at least ten percent of its patient days to Medicaid recipients. Similarly, North Bay agreed to provide 9.7 percent of its total annual patient days to Medicaid and charity patients combined. North Bay, by contrast, provided only 3.56 percent of its total patient days to Medicaid patients in 2002, and would have to significantly reverse a declining trend in its Medicaid provision to comply with the imposed condition. Community Hospital better satisfies the criterion. Section 408.035(12) has been stipulated as not applicable in this case. Adverse Impact on Existing Providers Historical figures demonstrate that hospital market shares are not static, but fluctuate with competition. No hospital is entitled to a specific or historic market share free from competition. While the applicants are located in health planning Sub-District 5-1 and Helen Ellis and the two Mease hospitals are located in health planning Sub-District 5- 2, they compete for business. None of the opponents is a disproportionate share, safety net, Medicaid provider. As a result, AHCA gives less consideration to any potential adverse financial impact upon them resulting from the approval of either application as a low priority. The opponents, however, argue that the approval of either replacement hospital would severely affect each of them. While the precise distance from the existing facilities to the relocation sites is relevant, it is clear that neither applicants' proposed site is unreasonably close to any of the existing providers. In fact, Community Hospital intends to locate its replacement facility three miles farther away from Helen Ellis and 1.5 miles farther away from Mease Dunedin Hospital. While Helen Ellis' primary service area is seemingly fluid, as noted by its chief operating officer's hearing and deposition testimony, and the Mease hospitals are located 15 to 20 miles south, they overlap parts of the applicants' primary service areas. Accordingly, each applicant concedes that the proposed increase in their patient volume would be derived from the growing population as well as existing providers. Although it is clear that the existing providers may be more affected by the approval of Community Hosptial's proposal, the exact degree to which they will be adversely impacted by either applicant is unknown. All parties agree, however, that the existing providers will experience less adverse affects by the approval of only one applicant, as opposed to two. Furthermore, Mease concedes that its hospitals will continue to aggressively compete and will remain profitable. In fact, Mease's adverse impact analysis does not show any credible reduction in loss of acute care admissions at Mease Countryside Hospital or Mease Dunedin Hospital until 2010. Even then, the reliable evidence demonstrates that the impact is negligible. Helen Ellis, on the other hand, will likely experience a greater loss of patient volume. To achieve its utilization projections, Community Hospital will aggressively compete for and increase market share in Pinellas County zip code 34689, which borders Pasco County. While that increase does not facially prove that Helen Ellis will be materially affected by Community Hospital's replacement hospital, Helen Ellis will confront targeted competition. To minimize the potential adverse affect, Helen Ellis will aggressively compete to expand its market share in the Pinellas County zip codes south of 34689, which is experiencing population growth. In addition, Helen Ellis is targeting broader service markets, and has filed an application to establish an open- heart surgery program. While Helen Ellis will experience greater competition and financial loss, there is insufficient evidence to conclude that it will experience material financial adverse impact as a result of Community Hospital's proposed relocation. In fact, Helen Ellis' impact analysis is less than reliable. In its contribution-margin analysis, Helen Ellis utilized its actual hospital financial data as filed with AHCA for the fiscal year October 1, 2001, to September 30, 2002. The analysis included total inpatient and total outpatient service revenues found in the filed financial data, including ambulatory services and ancillary services, yet it did not include the expenses incurred in generating ambulatory or ancillary services revenue. As a result, the overstated net revenue per patient day was applied to its speculative lost number of patient days which resulted in an inflated loss of net patient service revenue. Moreover, the evidence indicates that Helen Ellis' analysis incorrectly included operational revenue and excluded expenses related to its 18-bed skilled nursing unit since neither applicant intends to operate a skilled nursing unit. While including the skilled nursing unit revenues, the analysis failed to include the sub-acute inpatient days that produced those revenues, and thereby over inflated the projected total lost net patient service revenue by over one million dollars.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Community Hospital's CON Application No. 9539, to establish a 376-bed replacement hospital in Pasco County, Sub- District 5-1, be granted; and North Bay's CON Application No. 9538, to establish a 122-bed replacement hospital in Pasco County, Sub-District 5- 1, be denied. DONE AND ENTERED this 19th day of March, 2004, in Tallahassee, Leon County, Florida. S WILLIAM R. PFEIFFER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2004. COPIES FURNISHED: James C. Hauser, Esquire R. Terry Rigsby, Esquire Metz, Hauser & Husband, P.A. 215 South Monroe Street, Suite 505 Post Office Box 10909 Tallahassee, Florida 32302 Stephen A. Ecenia, Esquire R. David Prescott, Esquire Richard M. Ellis, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Saliba, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Darrell White, Esquire William B. Wiley, Esquire McFarlain & Cassedy, P.A. 305 South Gadsden Street, Suite 600 Tallahassee, Florida 32301 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Rhonda M. Medows, M.D., Secretary Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308

Florida Laws (3) 120.569408.035408.039
# 4
TARPON SPRINGS HOSPITAL FOUNDATION, INC., D/B/A HELEN ELLIS MEMORIAL HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION AND NEW PORT RICHEY, INC., D/B/A COMMUNITY HOSPITAL, 02-003234CON (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 14, 2002 Number: 02-003234CON Latest Update: May 17, 2004

The Issue Whether the certificate of need (CON) applications filed by New Port Richey Hospital, Inc., d/b/a Community Hospital of New Port Richey (Community Hospital) (CON No. 9539), and Morton Plant Hospital Association, Inc., d/b/a North Bay Hospital (North Bay) (CON No. 9538), each seeking to replace and relocate their respective general acute care hospital, satisfy, on balance, the applicable statutory and rule criteria.

Findings Of Fact The Parties AHCA AHCA is the single state agency responsible for the administration of the CON program in Florida pursuant to Chapter 408, Florida Statutes (2000). The agency separately reviewed and preliminarily approved both applications. Community Hospital Community Hospital is a 300,000 square feet, accredited hospital with 345 licensed acute care beds and 56 licensed adult psychiatric beds, located in southern New Port Richey, Florida, within Sub-District 5-1. Community Hospital is seeking to construct a replacement facility approximately five miles to the southeast within a rapidly developing suburb known as "Trinity." Community Hospital currently provides a wide array of comprehensive inpatient and outpatient services and is the only provider of obstetrical and adult psychiatric services in Sub-District 5-1. It is the largest provider of emergency services in Pasco County with approximately 35,000 visits annually. It is also the largest provider of Medicaid and indigent patient days in Sub-District 5-1. Community Hospital was originally built in 1969 and is an aging facility. Although it has been renovated over time, the hospital is in poor condition. Community Hospital's average daily census is below 50 percent. North Bay North Bay is a 122-bed facility containing 102 licensed acute care beds and 20 licensed comprehensive medical rehabilitation beds, located approximately one mile north of Community Hospital in Sub-District 5-1. It serves a large elderly population and does not provide pediatric or obstetrical care. North Bay is also an aging facility and proposes to construct a replacement facility in the Trinity area. Notably, however, North Bay has spent approximately 12 million dollars over the past three years for physical improvements and is in reasonable physical condition. Helen Ellis Helen Ellis is an accredited hospital with 150 licensed acute care beds and 18 licensed skilled nursing unit beds. It is located in northern Pinellas County, approximately eight miles south of Community Hospital and nine miles south of North Bay. Helen Ellis provides a full array of acute care services including obstetrics and cardiac catheterization. Its daily census average has fluctuated over the years but is approximately 45 percent. Mease Mease operates two acute care hospitals in Pinellas County including Mease Dunedin Hospital, located approximately 18 to 20 miles south of the applicants and Mease Countryside Hospital, located approximately 16 to 18 miles south of Community and North Bay. Each hospital operates 189 licensed beds. The Mease hospitals are located in the adjacent acute care sub-district but compete with the applicants. The Health Planning District AHCA's Health Planning District 5 consists of Pinellas and Pasco Counties. U.S. Highway 41 runs north and south through the District and splits Pasco County into Sub- District 5-1 and Sub-District 5-2. Sub-District 5-1, where Community Hospital and North Bay are located, extends from U.S. 41 west to the Gulf Coast. Sub-District 5-2 extends from U.S. 41 to the eastern edge of Pasco County. Pinellas County is the most densely populated county in Florida and steadily grows at 5.52 percent per year. On the other hand, its neighbor to the north, Pasco County, has been experiencing over 15 percent annual growth in population. The evidence demonstrates that the area known as Trinity, located four to five miles southeast of New Port Richey, is largely responsible for the growth. With its large, single- owner land tracts, Trinity has become the area's fuel for growth, while New Port Richey, the older coastal anchor which houses the applicants' facilities, remains static. In addition to the available land in Trinity, roadway development in the southwest section of Pasco County is further fueling growth. For example, the Suncoast Highway, a major highway, was recently extended north from Hillsborough County through Sub-District 5-1, west of U.S. 41. It intersects with several large east-west thoroughfares including State Road 54, providing easy highway access to the Tampa area. The General Proposals Community Hospital's Proposal Community Hospital's CON application proposes to replace its existing, 401-bed hospital with a 376-bed state- of-the-art facility and relocate it approximately five miles to the southeast in the Trinity area. Community Hospital intends to construct a large medical office adjacent to its new facility and provide all of its current services including obstetrical care. It does not intend to change its primary service area. North Bay's Proposal North Bay's CON application proposes to replace its existing hospital with a 122-bed state-of-the-art facility and also plans to relocate it approximately eight miles to the southeast in the Trinity area of southwestern Pasco County. North Bay intends to provide the same array of services it currently offers its patients and will not provide pediatric and obstetrical care in the proposed facility. The proposed relocation site is adjacent to the Trinity Outpatient Center which is owned by North Bay's parent company, Morton Plant. The Outpatient Center offers a full range of diagnostic imaging services including nuclear medicine, cardiac nuclear stress testing, bone density scanning, CAT scanning, mammography, ultrasound, as well as many others. It also offers general and specialty ambulatory surgical services including urology; ear, nose and throat; ophthalmology; gastroenterology; endoscopy; and pain management. Approximately 14 physician offices are currently located at the Trinity Outpatient Center. The Condition of Community Hospital Facility Community Hospital's core facilities were constructed between 1969 and 1971. Additions to the hospital were made in 1973, 1975, 1976, 1977, 1979, 1981, 1992, and 1999. With an area of approximately 294,000 square feet and 401 licensed beds, or 733 square feet per bed, Community Hospital's gross area-to-bed ratio is approximately half of current hospital planning standards of 1,600 square feet per bed. With the exception of the "E" wing which was completed in 1999, all of the clinical and support departments are undersized. Medical-Surgical Beds And Intensive Care Units Community Hospital's "D" wing, constructed in 1975, is made up of two general medical-surgical unit floors which are grossly undersized. Each floor operates 47 general medical-surgical beds, 24 of which are in three-bed wards and 23 in semi-private rooms. None of the patient rooms in the "D" wing have showers or tubs so the patients bathe in a single facility located at the center of the wing on each floor. Community Hospital's "A" wing, added in 1973, is situated at the west end of the second floor and is also undersized. It too has a combination of semi-private rooms and three-bed wards without showers or tubs. Community Hospital's "F" wing, added in 1979, includes a medical-surgical unit on the second and third floor, each with semi-private and private rooms. The second floor unit is centrally located between a 56-bed adult psychiatric unit and the Surgical Intensive Care Unit (SICU) which creates security and privacy issues. The third floor unit is adjacent to the Medical Intensive Care Unit (MICU) which must be accessed through the medical-surgical unit. Neither intensive care unit (ICU) possesses an isolation area. Although the three-bed wards are generally restricted to in-season use, and not always full, they pose significant privacy, security, safety, and health concerns. They fail to meet minimum space requirements and are a serious health risk. The evidence demonstrates that reconfiguring the wards would be extremely costly and impractical due to code compliance issues. The wards hinder the hospital's acute care utilization, and impair its ability to effectively compete with other hospitals. Surgical Department and Recovery Community Hospital's surgical department is separated into two locations including the main surgical suite on the second floor and the Endoscopy/Pain Management unit located on the first floor of "C" wing. Consequently, the department cannot share support staff and space such as preparation and recovery. The main surgical suite, adjacent recovery room, and central sterile processing are 25 years old. This unit's operating rooms, cystoscopy rooms, storage areas, work- stations, central sterile, and recovery rooms are undersized and antiquated. The 12-bay Recovery Room has no patient toilet and is lacking storage. The soiled utility room is deficient. In addition, the patient bays are extremely narrow and separated by curtains. There is no direct connection to the sterile corridor, and staff must break the sterile field to transport patients from surgery to recovery. Moreover, surgery outpatients must pass through a major public lobby going to and returning from surgery. The Emergency Department Community Hospital's existing emergency department was constructed in 1992 and is the largest provider of hospital emergency services in Pasco County, handling approximately 35,000 visits per year. The hospital is also designated a "Baker Act" receiving facility under Chapter 394, Florida Statutes, and utilizes two secure examination rooms for emergent psychiatric patients. At less than 8,000 total square feet, the emergency department is severely undersized to meet the needs of its patients. The emergency department is currently undergoing renovation which will connect the triage area to the main emergency department. The renovation will not enlarge the entrance, waiting area, storage, nursing station, nor add privacy to the patient care areas in the emergency department. The renovation will not increase the total size of the emergency department, but in fact, the department's total bed availability will decrease by five beds. Similar to other departments, a more meaningful renovation cannot occur within the emergency department without triggering costly building code compliance measures. In addition to its space limitations, the emergency department is awkwardly located. In 1992, the emergency department was relocated to the front of the hospital and is completely separated from the diagnostic imaging department which remained in the original 1971 building. Consequently, emergency patients are routinely transported across the hospital for imaging and CT scans. Issues Relating to Replacement of Community Hospital Although physically possible, renovating and expanding Community Hospital's existing facility is unreasonable. First, it is cost prohibitive. Any significant renovation to the 1971, 1975, 1977, and 1979 structures would require asbestos abatement prior to construction, at an estimated cost of $1,000,000. In addition, as previously noted, the hospital will be saddled with the major expense of complying with all current building code requirements in the 40-year-old facility. Merely installing showers in patient rooms would immediately trigger a host of expensive, albeit necessary, code requirements involving access, wiring, square footage, fireproofing columns and beams, as well as floor/ceiling and roof/ceiling assemblies. Concurrent with the significant demolition and construction costs, the hospital will experience the incalculable expense and loss of revenue related to closing major portions, if not all, of the hospital. Second, renovation and expansion to the existing facility is an unreasonable option due to its physical restrictions. The 12'4" height of the hospital's first floor limits its ability to accommodate HVAC ductwork large enough to meet current ventilation requirements. In addition, there is inadequate space to expand any department within the confines of the existing hospital without cannibalizing adjacent areas, and vertical expansion is not an option. Community Hospital's application includes a lengthy Facility Condition Assessment which factually details the architectural, mechanical, and electrical deficiencies of the hospital's existing physical plant. The assessment is accurate and reasonable. Community Hospital's Proposed Replacement Community Hospital proposes to construct a six- story, 320 licensed beds, acute care replacement facility. The hospital will consist of 548,995 gross square feet and include a 56-bed adult psychiatric unit connected by a hallway to the first floor of the main hospital building. The proposal also includes the construction of an adjacent medical office building to centralize the outpatient offices and staff physicians. The evidence establishes that the deficiencies inherent in Community Hospital's existing hospital will be cured by its replacement hospital. All patients will be provided large private rooms. The emergency department will double in size, and contain private examination rooms. All building code requirements will be met or exceeded. Patients and staff will have separate elevators from the public. In addition, the surgical department will have large operating rooms, and adequate storage. The MICU and SICU will be adjacent to each other on the second floor to avoid unnecessary traffic within the hospital. Surgical patients will be transported to the ICU via a private elevator dedicated to that purpose. Medical-surgical patient rooms will be efficiently located on the third through sixth floors, in "double-T" configuration. Community Hospital's Existing and Proposed Sites Community Hospital is currently located on a 23-acre site inside the southern boundary of New Port Richey. Single- family homes and offices occupy the two-lane residential streets that surround the site on all sides. The hospital buildings are situated on the northern half of the site, with the main parking lot located to the south, in front of the main entrance to the hospital. Marine Parkway cuts through the southern half of the site from the west, and enters the main parking lot. A private medical mall sits immediately to the west of the main parking lot and a one-acre storm-water retention pond sits to the west of the mall. A private medical office building occupies the south end of the main parking lot and a four-acre drainage easement is located in the southwest corner of the site. Community Hospital's administration has actively analyzed its existing site, aging facility, and adjacent areas. It has commissioned studies by civil engineers, health care consultants, and architects. The collective evidence demonstrates that, although on-site relocation is potentially an option, on balance, it is not a reasonable option. Replacing Community Hospital on its existing site is not practical for several reasons. First, the hospital will experience significant disruption and may be required to completely close down for a period of time. Second, the site's southwestern large four-acre parcel is necessary for storm-water retention and is unavailable for expansion. Third, a reliable cost differential is unknown given Community Hospital's inability to successfully negotiate with the city and owners of the adjacent medical office complexes to acquire additional parcels. Fourth, acquiring other adjacent properties is not a viable option since they consist of individually owned residential lots. In addition to the site's physical restrictions, the site is hindered by its location. The hospital is situated in a neighborhood between small streets and a local school. From the north and south, motorists utilize either U.S. 19, a congested corridor that accommodates approximately 50,000 vehicles per day, or Grand and Madison Streets, two-lane streets within a school zone. From the east and west, motorists utilize similar two-lane neighborhood streets including Marine Parkway, which often floods in heavy rains. Community Hospital's proposed site, on the other hand, is a 53-acre tract positioned five miles from its current facility, at the intersection of two major thoroughfares in southwestern Pasco County. The proposed site offers ample space for all facilities, parking, outpatient care, and future expansion. In addition, Community Hospital's proposed site provides reasonable access to all patients within its existing primary service area made up of zip codes 34652, 34653, 34668, 34655, 34690, and 34691. For example, the average drive times from the population centers of each zip code to the existing site of the hospital and the proposed site are as follows: Zip code Difference Existing site Proposed site 34652 3 minutes 14 minutes 11 minutes 34653 8 minutes 11 minutes 3 minutes 34668 15 minutes 21 minutes 6 minutes 34655 11 minutes 4 minutes -7 minutes 34690 11 minutes 13 minutes 2 minutes 34691 11 minutes 17 minutes 6 minutes While the average drive time from the population centroids of zip codes 34653, 34668, 34690, and 34691 to the proposed site slightly increases, it decreases from the Trinity area, where population growth has been most significant in southwestern Pasco County. In addition, a motorist's average drive time from Community Hospital's existing location to its proposed site is only 10 to 11 minutes, and patients utilizing public transportation will be able to access the new hospital via a bus stop located adjacent to the proposed site. The Condition of North Bay Facility North Bay Hospital is also an aging facility. Its original structure and portions of its physical plant are approximately 30 years old. Portions of its major mechanical systems will soon require replacement including its boilers, air handlers, and chillers. In addition, the hospital is undersized and awkwardly configured. Despite its shortcomings, however, North Bay is generally in good condition. The hospital has been consistently renovated and updated over time and is aesthetically pleasing. Moreover, its second and third floors were added in 1986, are in good shape, and structurally capable of vertical expansion. Medical Surgical Beds and ICU Units By-in-large, North Bay is comprised of undersized, semi-private rooms containing toilet and shower facilities. The hospital does not have any three-bed wards. North Bay's first floor houses all ancillary and support services including lab, radiology, pharmacy, surgery, pre-op, post-anesthesia recovery, central sterile processing and supply, kitchen and cafeteria, housekeeping and administration, as well as the mechanical, electrical, and facilities maintenance and engineering. The first floor also contains a 20-bed CMR unit and a 15-bed acute care unit. North Bay's second and third floors are mostly comprised of semi-private rooms and supporting nursing stations. Although the rooms and stations are not ideally sized, they are in relatively good shape. North Bay utilizes a single ICU with ten critical care beds. The ICU rooms and nursing stations are also undersized. A four-bed ICU ward and former nursery are routinely used to serve overflow patients. Surgery Department and Recovery North Bay utilizes a single pre-operative surgical room for all of its surgery patients. The room accommodates up to five patient beds, but has limited space for storage and pre-operative procedures. Its operating rooms are sufficiently sized. While carts and large equipment are routinely stored in hallways throughout the surgical suite, North Bay has converted the former obstetrics recovery room to surgical storage and has made efficient use of other available space. North Bay operates a small six-bed Post Anesthesia Care Unit. Nurses routinely prepare patient medications in the unit which is often crowded with staff and patients. The Emergency Department North Bay has recently expanded its emergency department. The evidence demonstrates that this department is sufficient and meets current and future expected patient volumes. Replacement Issues Relating to North Bay While it is clear that areas of North Bay's physical plant are aging, the facility is in relatively good condition. It is apparent that North Bay must soon replace significant equipment, including cast-iron sewer pipes, plumbing, boilers, and chillers which will cause some interruption to hospital operations. However, North Bay's four-page written assessment of the facility and its argument citing the need for total replacement is, on balance, not persuasive. North Bay's Proposed Replacement North Bay proposes to construct a new, state-of-the- art, hospital approximately eight miles southeast of its existing facility and intends to offer the identical array of services the hospital currently provides. North Bay's Existing and Proposed Sites North Bay's existing hospital is located on an eight-acre site with limited storm-water drainage capacity. Consequently, much of its parking area is covered by deep, porous, gravel instead of asphalt. North Bay's existing site is generally surrounded by residential properties. While the city has committed, in writing, it willingness to assist both applicants with on-site expansion, it is unknown whether North Bay can acquire additional adjacent property. North Bay's proposed site is located at the intersection of Trinity Oaks Boulevard and Mitchell Boulevard, south of Community Hospital's proposed site, and is quite spacious. It contains sufficient land for the facilities, parking, and future growth, and has all necessary infrastructure in place, including utility systems, storm- water structures, and roadways. Currently however, there is no public transportation service available to North Bay's proposed site. Projected Utilization by Applicants The evidence presented at hearing indicates that, statewide, replacement hospitals often increase a provider's acute care bed utilization. For example, Bartow Memorial Hospital, Heart of Florida Regional Medical Center, Lake City Medical Center, Florida Hospital Heartland Medical Center, South Lake Hospital, and Florida Hospital-Fish Memorial each experienced significant increases in utilization following the opening of their new hospital. The applicants in this case each project an increase in utilization following the construction of their new facility. Specifically, Community Hospital's application projects 82,685 total hospital patient days (64,427 acute care patient days) in year one (2006) of the operation of its proposed replacement facility, and 86,201 total hospital patient days (67,648 acute care patient days) in year two (2007). Using projected 2006 and 2007 population estimates, applying 2002 acute care hospital use rates which are below 50 percent, and keeping Community Hospital's acute care market share constant at its 2002 level, it is reasonably estimated that Community Hospital's existing hospital will experience 52,623 acute care patient days in 2006, and 53,451 acute care patient days in 2007. Consequently, Community Hospital's proposed facility must attain 11,804 additional acute care patient days in 2006, and 14,197 more acute care patient days in 2007, in order to achieve its projected acute care utilization. Although Community Hospital lost eight percent of the acute care market in its service area between 1995 and 2002, two-thirds of that loss was due to residents of Sub- District 5-1 acquiring services in another area. While Community Hospital experienced 78,444 acute care patient days in 1995, it projects only 64,427 acute care patient days in year one. Given the new facility and population factors, it is reasonable that the hospital will recapture half of its lost acute care market share and achieve its projections. With respect to its psychiatric unit, Community Hospital projects 16,615 adult psychiatric inpatient days in year one (2006) and 17,069 adult inpatient days in year two (2007) of the proposed replacement hospital. The evidence indicates that these projections are reasonable. Similarly, North Bay's acute care utilization rate has been consistently below 50 percent. Since 1999, the hospital has experienced declining utilization. In its application, North Bay states that it achieved total actual acute care patient days of 21,925 in 2000 and 19,824 in 2001 and the evidence at hearing indicates that North Bay experienced 17,693 total acute care patient days in 2002. North Bay projects 25,909 acute care patient days in the first year of operation of its proposed replacement hospital, and 27,334 acute care patient days in the second year of operation. Despite each applicant's current facility utilization rate, Community Hospital must increase its current acute care patient days by 20 percent to reach its projected utilization, and North Bay must increase its patient days by at least 50 percent. Given the population trends, service mix and existing competition, the evidence demonstrates that it is not possible for both applicants to simultaneously achieve their projections. In fact, it is strongly noted that the applicants' own projections are predicated upon only one applicant being approved and cannot be supported with the approval of two facilities. Local Health Plan Preferences In its local health plan for District 5, the Suncoast Health Council, Inc., adopted acute care preferences in October, 2000. The replacement of an existing hospital is not specifically addressed by any of the preferences. However, certain acute care preferences and specialty care preferences are applicable. The first applicable preference provides that preference "shall be given to an applicant who proposes to locate a new facility in an area that will improve access for Medicaid and indigent patients." It is clear that the majority of Medicaid and indigent patients live closer to the existing hospitals. However, Community Hospital proposes to move 5.5 miles from its current location, whereas North Bay proposes to move eight miles from its current location. While the short distances alone are less than significant, North Bay's proposed location is further removed from New Port Richey, is not located on a major highway or bus-route, and would therefore be less accessible to the medically indigent residents. Community Hospital's proposed site will be accessible using public transportation. Furthermore, Community Hospital has consistently provided excellent service to the medically indigent and its proposal would better serve that population. In 2000, Community Hospital provided 7.4 percent of its total patient days to Medicaid patients and 0.8 percent of its total patient days to charity patients. Community Hospital provided the highest percentage and greatest number of Medicaid patient days in Sub-District 5-1. By comparison, North Bay provided 5.8 percent of its total patient days to Medicaid patients and 0.9 percent of its total patient days to charity patients. In 2002, North Bay's Medicaid patients days declined to 3.56 percent. Finally, given the closeness and available bed space of the existing providers and the increasing population in the Trinity area, access will be improved by Community Hospital's relocation. The second local health plan preference provides that "[i]n cases where an applicant is a corporation with previously awarded certificates of need, preference shall be given to those which follow through in a timely manner to construct and operate the additional facilities or beds and do not use them for later negotiations with other organizations seeking to enter or expand the number of beds they own or control." Both applicants meet this preference. The third local health plan preference recognizes "Certificate of Need applications that provide AHCA with documentation that they provide, or propose to provide, the largest percentage of Medicaid and charity care patient days in relation to other hospitals in the sub-district." Community Hospital provides the largest percentage of Medicaid and charity care patient days in relation to other hospitals in Sub-District 5-1, and therefore meets this preference. The fourth local health plan preference applies to "Certificate of Need applications that demonstrate intent to serve HIV/AIDS infected persons." Both applicants accept and treat HIV/AIDS infected persons, and would continue to do so in their proposed replacement hospitals. The fifth local health plan preference recognizes "Certificate of Need applications that commit to provide a full array of acute care services including medical-surgical, intensive care, pediatric, and obstetrical services within the sub-district for which they are applying." Community Hospital qualifies since it will continue to provide its current services, including obstetrical care and psychiatric care, in its proposed replacement hospital. North Bay discontinued its pediatric and obstetrical programs in 2001, does not intend to provide them in its proposed replacement hospital, and will not provide psychiatric care. Agency Rule Preferences Florida Administrative Code Rule 59C-1.038(6) provides an applicable preference to a facility proposing "new acute care services and capital expenditures" that has "a documented history of providing services to medically indigent patients or a commitment to do so." As the largest Medicaid provider in Sub-District 5-1, Community Hospital meets this preference better than does North Bay. North Bay's history demonstrates a declining rate of service to the medically indigent. Statutory Review Criteria Section 408.035(1), Florida Statutes: The need for the health care facilities and health services being proposed in relation to the applicable district health plan District 5 includes Pasco and Pinellas County. Pasco County is rapidly developing, whereas Pinellas County is the most densely populated county in Florida. Given the population trends, service mix, and utilization rates of the existing providers, on balance, there is a need for a replacement hospital in the Trinity area. Section 408.035(2), Florida Statutes: The availability, quality of care, accessibility, and extent of utilization of existing health care facilities and health services in the service district of the applicant Community Hospital and North Bay are both located in Sub-District 5-1. Each proposes to relocate to an area of southwestern Pasco County which is experiencing explosive population growth. The other general acute care hospital located in Sub-District 5-1 is Regional Medical Center Bayonet Point, which is located further north, in the Hudson area of western Pasco County. The only other acute care hospitals in Pasco County are East Pasco Medical Center, in Zephyrhills, and Pasco Community Hospital, in Dade City. Those hospitals are located in Sub-District 5-2, east Pasco County, far from the area proposed to be served by either Community Hospital or North Bay. District 5 includes Pinellas County as well as Pasco County. Helen Ellis and Mease are existing hospital providers located in Pinellas County. Helen Ellis has 168 licensed beds, consisting of 150 acute care beds and an 18-bed skilled nursing unit, and is located 7.9 miles from Community Hospital's existing location and 10.8 miles from Community Hospital's proposed location. Access to Helen Ellis for patients originating from southwestern Pasco County requires those patients to travel congested U.S. 19 south to Tarpon Springs. As a result, the average drive time from Community Hospital's existing and proposed site to Helen Ellis is approximately 22 minutes. Helen Ellis is not a reasonable alternative to Community Hospital's proposal. The applicants' proposals are specifically designed for the current and future health care needs of southwestern Pasco County. Given its financial history, it is unknown whether Helen Ellis will be financially capable of providing the necessary care to the residents of southwestern Pasco. Mease Countryside Hospital has 189 licensed acute care beds. It is located 16.0 miles from Community Hospital's existing location and 13.8 miles from Community Hospital's proposed location. The average drive time to Mease Countryside is 32 minutes from Community Hospital's existing site and 24 minutes from its proposed site. In addition, Mease Countryside Hospital has experienced extremely high utilization over the past several years, in excess of 90 percent for calendar years 2000 and 2001. Utilization at Mease Countryside Hospital has remained over 80 percent despite the addition of 45 acute care beds in April 2002. Given the growth and demand, it is unknown whether Mease can accommodate the residents in southwest Pasco County. Mease Dunedin Hospital has 189 licensed beds, consisting of 149 acute care beds, a 30-bed skilled nursing unit, five Level 2 neonatal intensive care beds, and five Level 3 neonatal intensive care beds. Its former 15-bed adult psychiatric unit has been converted into acute care beds. It is transferring its entire obstetrics program at Mease Dunedin Hospital to Mease Countryside Hospital. Mease Dunedin Hospital is located approximately 18 to 20 miles from the applicants' existing and proposed locations with an average drive time of 35-38 minutes. With their remote location, and the exceedingly high utilization at Mease Countryside Hospital, neither of the two Mease hospitals is a viable alternative to the applicants' proposals. In addition, the construction of a replacement hospital would positively impact economic development and further attract medical professionals to Sub-District 5-1. On balance, given the proximity, utilization, service array, and accessibility of the existing providers, including the applicants, the relocation of Community Hospital will enhance access to health care to the residents. Section 408.035(3), Florida Statutes: The ability of the applicant to provide quality of care and the applicant's record of providing quality of care As stipulated, both applicants provide excellent quality of care. However, Community Hospital's proposal will better enhance its ability to provide quality care. Community is currently undersized, non-compliant with today's standards, and located on a site that does not allow for reasonable expansion. Its emergency department is inadequate for patient volume, and the configuration of the first floor leads to inefficiencies in the diagnosis and treatment of emergency patients. Again, most inpatients are placed in semi-private rooms and three-bed wards, with no showers or tubs, little privacy, and an increased risk of infection. The hospital's waiting areas for families of patients are antiquated and undersized, its nursing stations are small and cramped and the operating rooms and storage facilities are undersized. Community Hospital's deficiencies will be effectively eliminated by its proposed replacement hospital. As a result, patients will experience qualitatively better care by the staff who serve them. Conversely, North Bay is in better physical condition and not in need of replacement. It has more reasonable options to expand or relocate its facility on site. Quality of care at North Bay will not be markedly enhanced by the construction of a new hospital. Sections 408.035(4)and(5), Florida Statutes, have been stipulated as not applicable in this case. Section 408.035(6), Florida Statutes: The availability of resources, including health personnel, management personnel, and funds available for capital and operating expenditures, for project accomplishment and operation The parties stipulated that both Community Hospital and North Bay have available health personnel and management personnel for project accomplishment and operation. In addition, the evidence proves that both applicants have sufficient funds for capital and operating expenditures. Community Hospital proposes to rely on its parent company to finance the project. Keith Giger, Vice-President of Finance for HCA, Inc., Community Hospital's parent organization, provided credible deposition testimony that HCA, Inc., will finance 100 percent of the total project cost by an inter-company loan at eight percent interest. Moreover, it is noted that the amount to be financed is actually $20 million less than the $196,849,328 stated in the CON Application, since Community Hospital previously purchased the proposed site in June 2003 with existing funds and does not need to finance the land acquisition. Community Hospital has sufficient working capital for operating expenditures of the proposed replacement hospital. North Bay, on the other hand, proposes to acquire financing from BayCare Obligated Group which includes Morton Plant Hospital Association, Inc.; Mease; and several other hospital entities. Its proposal, while feasible, is less certain since member hospitals must approve the indebtedness, thereby providing Mease with the ability to derail North Bay's proposed bond financing. Section 408.035(7), Florida Statutes: The extent to which the proposed services will enhance access to health care for residents of the service district The evidence proves that either proposal will enhance geographical access to the growing population in the service district. However, with its provision of obstetrical services, Community Hospital is better suited to address the needs of the younger community. With respect to financial access, both proposed relocation sites are slightly farther away from the higher elderly and indigent population centers. Since the evidence demonstrates that it is unreasonable to relocate both facilities away from the down-town area, Community Hospital's proposal, on balance, provides better access to poor patients. First, public transportation will be available to Community Hospital's site. Second, Community Hospital has an excellent record of providing care to the poor and indigent and has accepted the agency's condition to provide ten percent of its total annual patient days to Medicaid recipients To the contrary, North Bay's site will not be accessible by public transportation. In addition, North Bay has a less impressive record of providing care to the poor and indigent. Although AHCA conditioned North Bay's approval upon it providing 9.7 percent of total annual patient days to Medicaid and charity patients, instead of the 9.7 percent of gross annual revenue proposed in its application, North Bay has consistently provided Medicaid and charity patients less than seven percent of its total annual patient days. Section 408.035(8), Florida Statutes: The immediate and long-term financial feasibility of the proposal Immediate financial feasibility refers to the availability of funds to capitalize and operate the proposal. See Memorial Healthcare Group, Ltd. d/b/a Memorial Hospital Jacksonville vs. AHCA et al., Case No. 02-0447 et seq. Community Hospital has acquired reliable financing for the project and has sufficiently demonstrated that its project is immediately financially feasible. North Bay's short-term financial proposal is less secure. As noted, North Bay intends to acquire financing from BayCare Obligated Group. As a member of the group, Mease, the parent company of two hospitals that oppose North Bay's application, must approve the plan. Long-term financial feasibility is the ability of the project to reach a break-even point within a reasonable period of time and at a reasonable achievable point in the future. Big Bend Hospice, Inc. vs. AHCA and Covenant Hospice, Inc., Case No. 02-0455. Although CON pro forma financial schedules typically show profitability within two to three years of operation, it is not a requirement. In fact, in some circumstances, such as the case of a replacement hospital, it may be unrealistic for the proposal to project profitability before the third or fourth year of operation. In this case, Community Hospital's utilization projections, gross and net revenues, and expense figures are reasonable. The evidence reliably demonstrates that its replacement hospital will be profitable by the fourth year of operation. The hospital's financial projections are further supported by credible evidence, including the fact that the hospital experienced financial improvement in 2002 despite its poor physical condition, declining utilization, and lost market share to providers outside of its district. In addition, the development and population trends in the Trinity area support the need for a replacement hospital in the area. Also, Community Hospital has benefited from increases in its Medicaid per diem and renegotiated managed care contracts. North Bay's long-term financial feasibility of its proposal is less certain. In calendar year 2001, North Bay incurred an operating loss of $306,000. In calendar year 2002, it incurred a loss of $1,160,000. In its CON application, however, North Bay projects operating income of $1,538,827 in 2007, yet omitted the ongoing expenses of interest ($1,600,000) and depreciation ($3,000,000) from its existing facility that North Bay intends to continue operating. Since North Bay's proposal does not project beyond year two, it is less certain whether it is financially feasible in the third or fourth year. In addition to the interest and depreciation issues, North Bay's utilization projections are less reasonable than Community Hospital's proposal. While possible, North Bay will have a difficult task achieving its projected 55 percent increase in acute care patient days in its second year of operation given its declining utilization, loss of obstetric/pediatric services and termination of two exclusive managed care contracts. Section 408.035(9), Florida Statutes: The extent to which the proposal will foster competition that promotes quality and cost-effectiveness Both applicants have substantial unused capacity. However, Community Hospital's existing facility is at a distinct competitive disadvantage in the market place. In fact, from 1994 to 1998, Community Hospital's overall market share in its service area declined from 40.3 percent to 35.3 percent. During that same period, Helen Ellis' overall market share in Community Hospital's service area increased from 7.2 percent to 9.2 percent. From 1995 to the 12-month period ending June 30, 2002, Community Hospital's acute care market share in its service area declined from 34.0 percent to 25.9 percent. During that same period, Helen Ellis' acute care market share in Community Hospital's service area increased from 11.7 percent to 12.0 percent. In addition, acute care average occupancy rates at Mease Dunedin Hospital increased each year from 1999 through 2002. Acute care average occupancy at Mease Countryside Hospital exceeded 90 percent in 2000 and 2001, and was approximately 85 percent for the period ending June 30, 2002. Some of the loss in Community Hospital's market share is due to an out-migration of patients from its service area to hospitals in northern Pinellas and Hillsborough Counties. Market share in Community's service area by out-of- market providers increased from 33 percent in 1995 to 40 percent in 2002. Community Hospital's outdated hospital has hampered its ability to compete for patients in its service area. Mease is increasing its efforts to attract patients and currently completing a $92 million expansion of Mease Countryside Hospital. The project includes the development of 1,134 parking spaces on 30 acres of raw land north of the Mease Countryside Hospital campus and the addition of two floors to the hospital. It also involves the relocation of 51 acute care beds, the obstetrics program and the Neonatal Intensive Care Units from Mease Dunedin Hosptial to Mease Countryside Hospital. Mease is also seeking to more than double the size of the Countryside emergency department to handle its 62,000 emergency visits. With the transfer of licensed beds from Mease Dunedin Hospital to Mease Countryside Hospital, Mease will also convert formerly semi-private patient rooms to private rooms at Mease Dunedin Hospital. The approval of Community Hospital's relocated facility will enable it to better compete with the hospitals in the area and promote quality and cost- effectiveness. North Bay, on the other hand, is not operating at a distinct disadvantage, yet is still experiencing declining utilization. North Bay is the only community-owned, not-for- profit provider in western Pasco County and is a valuable asset to the city. Section 408.035(10), Florida Statutes: The costs and methods of the proposed construction, including the costs and methods or energy provision and the availability of alternative, less costly, or more effective methods of construction The parties stipulated that the project costs in both applications are reasonable to construct the replacement hospitals. Community Hospital's proposed construction cost per square foot is $175, and slightly less than North Bay's $178 proposal. The costs and methods of proposed construction for each proposal is reasonable. Given Community Hospital's severe site and facility problems, the evidence demonstrates that there is no reasonable, less costly, or more effective methods of construction available for its proposed replacement hospital. Additional "band-aide" approaches are not financially reasonable and will not enable Community Hospital to effectively compete. The facility is currently licensed for 401 beds, operates approximately 311 beds and is still undersized. The proposed replacement hospital will meet the standards in Florida Administrative Code Rule 59A-3.081, and will meet current building codes, including the Americans with Disabilities Act and the Guidelines for Design and Construction of Hospitals and Health Care Facilities, developed by the American Institute of Architects. The opponents' argue that Community Hospital will not utilize the 320 acute care beds proposed in its CON application, and therefore, a smaller facility is a less- costly alternative. In addition, Helen Ellis' architectural expert witness provided schematic design alternatives for Community Hospital to be expanded and replaced on-site, without providing a detailed and credible cost accounting of the alternatives. Given the evidence and the law, their arguments are not persuasive. While North Bay's replacement cost figures are reasonable, given the aforementioned reasons, including the fact that the facility is in reasonably good condition and can expand vertically, on balance, it is unreasonable for North Bay to construct a replacement facility in the Trinity area. Section 408.035(11), Florida Statutes: The applicant's past and proposed provision of health care services to Medicaid patients and the medically indigent Community Hospital has consistently provided the most health care services to Medicaid patients and the medically indigent in Sub-District 5-1. Community Hospital agreed to provide at least ten percent of its patient days to Medicaid recipients. Similarly, North Bay agreed to provide 9.7 percent of its total annual patient days to Medicaid and charity patients combined. North Bay, by contrast, provided only 3.56 percent of its total patient days to Medicaid patients in 2002, and would have to significantly reverse a declining trend in its Medicaid provision to comply with the imposed condition. Community Hospital better satisfies the criterion. Section 408.035(12) has been stipulated as not applicable in this case. Adverse Impact on Existing Providers Historical figures demonstrate that hospital market shares are not static, but fluctuate with competition. No hospital is entitled to a specific or historic market share free from competition. While the applicants are located in health planning Sub-District 5-1 and Helen Ellis and the two Mease hospitals are located in health planning Sub-District 5- 2, they compete for business. None of the opponents is a disproportionate share, safety net, Medicaid provider. As a result, AHCA gives less consideration to any potential adverse financial impact upon them resulting from the approval of either application as a low priority. The opponents, however, argue that the approval of either replacement hospital would severely affect each of them. While the precise distance from the existing facilities to the relocation sites is relevant, it is clear that neither applicants' proposed site is unreasonably close to any of the existing providers. In fact, Community Hospital intends to locate its replacement facility three miles farther away from Helen Ellis and 1.5 miles farther away from Mease Dunedin Hospital. While Helen Ellis' primary service area is seemingly fluid, as noted by its chief operating officer's hearing and deposition testimony, and the Mease hospitals are located 15 to 20 miles south, they overlap parts of the applicants' primary service areas. Accordingly, each applicant concedes that the proposed increase in their patient volume would be derived from the growing population as well as existing providers. Although it is clear that the existing providers may be more affected by the approval of Community Hosptial's proposal, the exact degree to which they will be adversely impacted by either applicant is unknown. All parties agree, however, that the existing providers will experience less adverse affects by the approval of only one applicant, as opposed to two. Furthermore, Mease concedes that its hospitals will continue to aggressively compete and will remain profitable. In fact, Mease's adverse impact analysis does not show any credible reduction in loss of acute care admissions at Mease Countryside Hospital or Mease Dunedin Hospital until 2010. Even then, the reliable evidence demonstrates that the impact is negligible. Helen Ellis, on the other hand, will likely experience a greater loss of patient volume. To achieve its utilization projections, Community Hospital will aggressively compete for and increase market share in Pinellas County zip code 34689, which borders Pasco County. While that increase does not facially prove that Helen Ellis will be materially affected by Community Hospital's replacement hospital, Helen Ellis will confront targeted competition. To minimize the potential adverse affect, Helen Ellis will aggressively compete to expand its market share in the Pinellas County zip codes south of 34689, which is experiencing population growth. In addition, Helen Ellis is targeting broader service markets, and has filed an application to establish an open- heart surgery program. While Helen Ellis will experience greater competition and financial loss, there is insufficient evidence to conclude that it will experience material financial adverse impact as a result of Community Hospital's proposed relocation. In fact, Helen Ellis' impact analysis is less than reliable. In its contribution-margin analysis, Helen Ellis utilized its actual hospital financial data as filed with AHCA for the fiscal year October 1, 2001, to September 30, 2002. The analysis included total inpatient and total outpatient service revenues found in the filed financial data, including ambulatory services and ancillary services, yet it did not include the expenses incurred in generating ambulatory or ancillary services revenue. As a result, the overstated net revenue per patient day was applied to its speculative lost number of patient days which resulted in an inflated loss of net patient service revenue. Moreover, the evidence indicates that Helen Ellis' analysis incorrectly included operational revenue and excluded expenses related to its 18-bed skilled nursing unit since neither applicant intends to operate a skilled nursing unit. While including the skilled nursing unit revenues, the analysis failed to include the sub-acute inpatient days that produced those revenues, and thereby over inflated the projected total lost net patient service revenue by over one million dollars.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Community Hospital's CON Application No. 9539, to establish a 376-bed replacement hospital in Pasco County, Sub- District 5-1, be granted; and North Bay's CON Application No. 9538, to establish a 122-bed replacement hospital in Pasco County, Sub-District 5- 1, be denied. DONE AND ENTERED this 19th day of March, 2004, in Tallahassee, Leon County, Florida. S WILLIAM R. PFEIFFER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2004. COPIES FURNISHED: James C. Hauser, Esquire R. Terry Rigsby, Esquire Metz, Hauser & Husband, P.A. 215 South Monroe Street, Suite 505 Post Office Box 10909 Tallahassee, Florida 32302 Stephen A. Ecenia, Esquire R. David Prescott, Esquire Richard M. Ellis, Esquire Rutledge, Ecenia, Purnell & Hoffman, P.A. 215 South Monroe Street, Suite 420 Post Office Box 551 Tallahassee, Florida 32302-0551 Richard J. Saliba, Esquire Agency for Health Care Administration Fort Knox Building III, Mail Station 3 2727 Mahan Drive Tallahassee, Florida 32308 Robert A. Weiss, Esquire Karen A. Putnal, Esquire Parker, Hudson, Rainer & Dobbs, LLP The Perkins House, Suite 200 118 North Gadsden Street Tallahassee, Florida 32301 Darrell White, Esquire William B. Wiley, Esquire McFarlain & Cassedy, P.A. 305 South Gadsden Street, Suite 600 Tallahassee, Florida 32301 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308 Rhonda M. Medows, M.D., Secretary Agency for Health Care Administration 2727 Mahan Drive, Mail Station 3 Tallahassee, Florida 32308

Florida Laws (3) 120.569408.035408.039
# 5
WUESTHOFF HOSPITAL vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-001220 (1988)
Division of Administrative Hearings, Florida Number: 88-001220 Latest Update: Jun. 30, 1989

Findings Of Fact Background On July 31, 1987, the Department of Health and Rehabilitative Services (HRS) published in the Florida Administrative Weekly an announcement of the fixed need pools for the subject batching cycle, which pertained to the planning horizon of July, 1992. According to the notice, the fixed need pool, which was calculated pursuant to Rules 10-5.008(6) and 10-5.011(m), (n), (o), and (q), Florida Administrative Code, was adjusted according to the occupancy rate thresholds as prescribed by said rules. The net adjusted need for short-term psychiatric beds in District 7 was zero. By letter to HRS dated August 12, 1987, the North Brevard County Hospital District, doing business as Jess Parrish Memorial Hospital (Jess Parrish), provided notice of its intent to apply for a certificate of need to convert 16 beds from medical/surgical to psychiatric. By Application for Certificate of Need dated September 14, 1987, Jess Parrish requested that HRS grant a certificate of need for the conversion of 16 medical/surgical beds to 16 adult short-term psychiatric beds at a cost of $46,100. Jess Parrish is a tax-exempt organization whose board of directors have been authorized by law to levy ad valorem taxes in a special tax district in north Brevard County for the support of the hospital. The main hospital is located at 951 North Washington Avenue in Titusville, which is in north Brevard County. Brevard County is located in HRS District 7. By letter to Jess Parrish dated October 5, 1987, HRS requested additional information. By response dated November 9, 1987, Jess Parrish supplied the requested responses to omissions. By letter dated November 18, 1987, Jess Parrish provided additional information desired by HRS. By letter dated December 22, 1987, Wuesthoff Hospital (Wuesthoff) informed HRS that it objected to the above-described application because of absence of need. The letter states that Wuesthoff maintained an occupancy rate of 74% during the past year in its 25 short-term psychiatric beds. Wuesthoff is located in Rockledge, which is in central Brevard County. By letter and State Agency Action Report dated January 25, 1988, HRS informed Jess Parrish of its intent to issue the requested certificate of need for the conversion of the 16 beds. By Petition for Formal Administrative Hearing filed February 23, 1988, Wuesthoff challenged the intent to award the certificate of need to Jess Parrish and requested a formal hearing. The Application and Approval Process The application for the certificate of need states that Jess Parrish has a total of 210 beds, consisting of 172 medical/surgical beds, 10 obstetric beds, 20 pediatric beds, and 8 intensive care unit beds. The application contains all elements required by law, including a resolution authorizing the application and financial statements. The application and omissions response state that Jess Parrish admitted about 100 psychiatric patients in fiscal year ending 1987. The omissions response adds that Jess Parrish would offer the following programs for its short-term psychiatric patients: continual evaluation, screening, and admissions; individual, family, and group therapy; occupational, recreational, and vocational therapy; psychological and psychiatric testing and evaluation; day hospital and day clinic; family and friends education and support groups; and specialized treatment programs for geriatric psychiatric patients. The omissions response reports that the only facility with adult short-term psychiatric beds within 45 minutes of Jess Parrish is Wuesthoff. The omissions response states that Wuesthoff had experienced the following occupancy rates in its adult short-term psychiatric program: 1984--59%; 1985--66%; 1986-- 7l%; and first three quarters of 1987--71%. The omissions response acknowledges that Jess Parrish and Circles of Care, Inc. (Circles of Care) had jointly prepared the application and that Jess Parrish "plans to employ by contract, Circles of Care, Inc. to operate and manage our unit" if the application is approved. The omissions response includes a letter to HRS dated November 10, 1987, from James B. Whitaker, as president of Circles of Care. The letter describes the 12-year relationship between the two parties, which began when Circles of Care leased its first 12 beds from Jess Parrish between 1974 and 1980. Mr. Whitaker states that the two parties thus "work[ed] out a management agreement; for the new sixteen bed unit that Jess Parrish has requested." In the State Agency Action Report, HRS notes that the project does not conform with Policy 4 of the applicable District 7 Local Health Plan. This policy provides that additional short-term inpatient psychiatric beds may be approved when the average annual occupancy rate for all existing facilities in the planning area equals or exceeds the following rates: adult--75% and adolescents/children--70%. HRS reports a similar discrepancy as to the occupancy standard in the State Health Plan, which incorporates at Objective 1.2 the same 70%/75% standards. HRS states in the State Agency Action Report that the 1986 occupancy rates for short-term psychiatric beds, which averaged 69.98% in Brevard County, were 87% at Circles of Care, 70.6% at Wuesthoff, and 14% at a new facility, C. P. C.--Palm Bay. In addition, for the first six months of 1987, the report states that the occupancy rates, which averaged 63.5% in Brevard County, were 76% at Circles of Care, 71.5% at Wuesthoff, and 43% at C. P. C.--Palm Bay. In calculating numeric need under the rule, HRS concludes that there was a net need for a total of 547 beds in the district, consisting of 312 in specialty hospitals and 235 in general hospitals. Addressing the provision of the District 7 Local Health Plan focusing upon need at the county level, HRS finds that there was a net need for a total of 38 beds. Recognizing the "sub- standard utilization" of existing short-term psychiatric beds, HRS states that the application was justified "mainly because of the enhanced access to services that the project would provide." All of the other criteria were fully satisfied with one irrelevant exception, and the State Agency Action Report concludes: Although the district and county utilization of short-term psychiatric beds falls below the 70% [sic) adult standard, this project merits a Certificate of Need because there exists numeric need in the service area and because the project affords greater access and availability to psychiatric services for underserved groups. Need District and State Health Plans Part 3 of the 1985 District 7 Local Health Plan, published by The Local Health Council of East Central Florida, Inc., sets forth policies and priorities for inpatient psychiatric services. Policy 1 establishes each of the four counties of District 7 as a subdistrict for purposes of planning inpatient psychiatric services. Policy 3 of the 1985 District 7 Local Health Plan provides a specific methodology to allocate beds when the numeric need rule methodology indicates a need for inpatient psychiatric beds. A minimum of .15 beds per 1000 projected population should be allocated to hospitals holding a general license. A total of .20 beds per 1000 projected population may be located in specialty hospitals or hospitals holding a general license. The population projections are for five years into the future. Policy 4 of the 1985 District 7 Local Health Plan provides that additional short-term inpatient psychiatric beds may be approved when the average annual occupancy rates for all existing facilities in the planning area equal or exceed 75% for adult facilities and 70% for adolescents/children facilities. The policy concludes: Additional beds should not be added to the health system' until the existing facilities are operating at acceptable levels of occupancy. Good utilization of existing facilities prior to adding beds aids in cost containment by preventing unnecessary duplication. The 1988 District 7 Local Health Plan, although inapplicable to the subject proceeding, refers to the pending application of Jess Parrish. The plan states: [T]he residents of District 7 appear to be well-served by the existing providers with only a few exceptions. First, residents of north Brevard County (Titusville area) currently have no access to any certified, short-term, inpatient psych services in less than 22 miles. In many driving situations this distance takes longer than 30-45 minutes to traverse. . . . If [the CON that has been tentatively approved] is sustained through litigation and the unit is finally opened availability of these 16 beds should ameliorate, to a large degree, the potential geographic access problems for north Brevard adult/geriatric patients at least. Objective 1.1 of the 1985-1987 State Health Plan states that the ratio of short-term inpatient hospital psychiatric beds to population should not exceed .35 beds to 1000 population. Objective 1.2 states that, through 1987, additional short-term psychiatric beds should not normally be approved unless the service districts has an average annual occupancy of 75% for existing and approved adult beds and 70% for existing and approved adolescents/children beds. Numeric Need Pursuant to HRS Rules Net Need Rule 10-5.011(1)(o)4., Florida Administrative Code, sets forth the HRS numeric need methodology. The rule provides that the projected number of beds shall be determined by applying the ratio of .35 beds to 1000 population to the projected population in five years, as estimated by the Executive Office of the Governor. The relevant projected population for District 7 is 1,564,098 persons. Applying the ratio, the gross number of beds needed in District 7 is 547. The total number of existing and approved short-term psychiatric beds in District 7 in 1987 was 410. There is therefore a net need for 137 short-term psychiatric beds in District 7. The relevant projected population for Brevard County is 441,593 persons. Applying the ratio, the gross number of beds needed in Brevard County is 155. The total number of existing and approved short-term psychiatric beds in Brevard County in 1987 was 117. There is therefore a net need for 38 short- term psychiatric beds in Brevard County. A minimum of .15 beds per 1000 population should be located in hospitals holding a general license, and .20 beds per 1000 population may be located in specialty hospitals or hospitals holding a general license. The calculations disclose that, for District 7, there is a net need of 73 beds in the former category and 65 beds in the latter category. As to Brevard County, the respective numbers are 41 and 4. Rule 10-5.011(1)(o)4.d., Florida Administrative Code, provides that new facilities for adults must be able to project a 70% occupancy rate for the first year and 80% occupancy rate for the third year. Jess Parrish projects that its short-term psychiatric program will experience a utilization rate of 66% at the end of the first complete year of operation and 82% at the end of the third complete year of operation. These projections are reasonable and substantially conform with the requirements of the rule. Rule 10-5.011(1)(o)4.e., Florida Administrative Code, provides that no additional short-term inpatient beds shall normally be approved unless the average annual occupancy rate for the preceding 12 months in a "service district" is at least 75% for all existing adult short-term inpatient psychiatric beds and at least 70% for all adolescents/children short-term inpatient psychiatric beds. HRS considered the 70%/75% occupancy standards in making the July, 1987, announcement of a zero fixed need pool for short-term psychiatric beds in Brevard County. The determination of zero fixed need was a reflection that, although numeric need existed, the occupancy standards had not been satisfied. The incorporation of the occupancy standard into the July, 1987, fixed need calculation represented a deviation from nonrule policy deferring computation of the occupancy levels until the application-review process. The prior announcement of a fixed need pool on February 27, 1987, stated that a number of beds were needed even though the occupancy situation in District 7 was about the same. Subsequent announcements likewise deferred consideration of the occupancy standard. HRS has explicated its nonrule policy of excluding occupancy standards from the calculation of numeric need when publishing fixed need pools. Unlike the relatively simple task of determining the relevant population projection and multiplying it by the proper ratio, application of the occupancy standards, especially at the time in question, required numerous determinations and calculations. By attempting to incorporate the occupancy standards into the calculations upon which the fixed need pool were based, HRS increased the potential for error, which occurred in this case, rather than increased the reliability of the information. Although adequate reason exists for revising the July, 1987, published fixed need pool, Rule 10-5.008(2)(a), Florida Administrative Code, prohibits revisions to a fixed need pool based upon a change in need methodologies, population estimates, bed inventories, or other factors leading to a different projection of need, if retroactively applied. However, the revision of the July, 1987, fixed need pool does not represent a change in need methodologies, population estimates, bed inventories, or other factors leading to a different projection of need, if retroactively applied. The revision to the fixed need pool, which did not represent a change in need methodology or underlying facts, was a result of three legitimate considerations. First, HRS revised the fixed need pool to implement its policy decision to limit the fixed need pool to the numeric need calculation and reserve the calculations of occupancy standards to the application-review process. This consideration does not involve a change in the methodology of determining numeric need or applying occupancy standards. Second, HRS revised the fixed need pool to correct earlier, erroneous calculations. This consideration does not involve a change in the underlying facts, but merely in the computations based upon the same facts. Third, HRS revised the fixed need pool to reflect developing policy in the application of the occupancy standards. HRS decided to apply the more liberal 70% occupancy standard to facilities serving both adults and adolescents/children, exclude from the determination of occupancy levels any facilities serving only age cohorts not served by the applicant, and restrict the 75% occupancy standard to facilities serving adults only. HRS made these changes, which it felt would not harm existing providers, in recognition of the failure of data provided by health-care suppliers to distinguish between adult and adolescents/children admissions and patient days. These considerations approximate a change in methodology, but the revision resulting from such considerations does not violate the rule because HRS already has shown that consideration of the occupancy standards should not take place until after publication of the fixed need pool. In the present case, two facilities in District 7 serve only adolescents/children. These facilities are C. P. C.-- Palm Bay and Laurel Oaks, which is in Orange County. Eliminating their occupancy rates, the district occupancy rate in the year ending June 30, 1987, was 71.9%. Removing the occupancy rate of C. P. C.--Palm Bay from Brevard County, the county occupancy rate during the same period was over 75%. Under the revised policies, Brevard County had a net need of 38 short- term psychiatric beds, applicable occupancy standards in the county and district were satisfied, and the July, 1987, publication of a fixed need pool of zero did not preclude the finding of need under other than "not normal" circumstances. Accessibility Financial Accessibility The primary service area of Jess Parrish is north Brevard County. A higher percentage of the population of this area lives below the poverty level than does the population of any other sub-region of Brevard County. According to the 1980 Census data, the applicable percentages of area residents living below the poverty level were 12.7% in north Brevard County, 10% in central Brevard County, 8.4% in south Brevard County, and 9.6% in Brevard County overall. Partly as a reflection of the different sub-regions and partly as a reflection of the commitment of Jess Parrish to provide access to underserved populations, Jess Parrish provides considerably more services to Medicaid patients than does either of the other major general hospitals in central and south Brevard County. In 1987, 11.5% of the admissions and 8.9% of the patient days at Jess Parrish were Medicaid. The respective numbers are 7% and 6% for Wuesthoff and 5.8% and 3.9% for Holmes Regional Medical Center, which is in Melbourne. A key component of financial accessibility is the effect of the proposed program on Circles of Care. About 55% of the patients of Circles of Care are indigent. Another 17% of its patients earn between the minimum wage and $15,000 annually. Circles of Care has participated in all phases of the application process on behalf of Jess Parrish. The approval of the new program would not have an adverse effect on Circles of Care. To the contrary, the new program at Jess Parrish would provide Circles of Care with more treatment options, especially with respect to indigent patients, whose need for short-term psychiatric services has proven at times difficult to meet. These options are especially valuable at a time when there is no net need in Brevard County for any more short-term psychiatric beds in specialty hospitals, such as Circles of Care. The 52 psychiatric beds licensed to Circles of Care are in two different units contained within a single hospital facility located in Melbourne, which is in south Brevard County. Sheridan Oaks is a 24-bed, private unit, which cannot accept many Baker Act patients without adversely affecting the other patients and the psychiatrists who refer private-pay patients to this unit. The other unit is a public Baker Act receiving facility with 28 beds, for which Circles of Care receives state funds. Unlike Sheridan Oaks, the public receiving facility employs the psychiatrists who work there. About 85-90% of all Baker Act patients in Brevard County come through this public receiving facility, whose occupancy rate was 98% in the year ending June 30, 1987. In addition to these units, Circles of Care operates a mental health outpatient clinic in Titusville, an outpatient/inpatient treatment center in the Rockledge/Cocoa area, numerous social clubs throughout Brevard County for the chronic mentally ill, and numerous public education and awareness programs concerning the treatability of mental illness. Another limitation of being a specialty hospital is that Circles of Care does not qualify for Medicaid reimbursement. Jess Parrish, as a general hospital, qualifies for such reimbursement and projects in its application that 39% of its patient days will be Medicaid and 9% of its patient days will be indigent. Geographic Access Jess Parrish is located at the north end of Brevard County, which runs about 80 miles north-south. Wuesthoff is about 25 miles south of Jess Parrish, and Titusville is about 40 miles north of Melbourne. Intercity north-south traffic uses Interstate 95, which is west of the above-described cities, and U.S. Route 1, which runs through the center of each of these cities. Rule 10-5.011(1)(o)5.g., Florida Administrative Code, provides that short-term inpatient psychiatric services should be located within a maximum travel time of 45 minutes under average travel conditions for at least 90% of the population of the service area. This criterion is presently met without the addition of short-term psychiatric beds at Jess Parrish. This factor is outweighed, however, by another factor in this case. Jess Parrish projects about half of its patients will be indigent or Medicaid, and north Brevard County has a disproportionate share of the county's impoverished residents. Average travel conditions for these persons require public transportation, which, in north Brevard County, is limited to Greyhound/Trailways and local taxi companies. Exclusive of time waiting for the bus and traveling to and from the bus stations, the time for the 25-mile trip between Titusville and Rockledge, of which there are three or four trips daily (excluding off-hour trips), ranges from 25-35 minutes. There is evidence in the record that mentally ill bus passengers do not always make it to their intended destinations by way of intercity buses. The use of available public transportation is therefore problematic, but in any event adds considerable time to the travel time to Wuesthoff for those individuals who do not own a motor vehicle. Effect on Wuesthoff The effect of the conversion of medical/surgical beds to short-term psychiatric beds will have no material effect on Wuesthoff, even though it did reduce the number of short-term psychiatric beds from 30 to 25 in 1986. The occupancy rate for Wuesthoff's short-term psychiatric unit in 1987 was 70.6%. The prime service areas of Wuesthoff and Jess Parrish as to psychiatric admissions do not substantially overlap. Although Jess Parrish may be expected to draw more patients from Wuesthoff's prime service area following commencement of the new operation, many of Jess Parrish's patients will be from the indigent and Medicaid payor classes for which the competition is not intense. The addition of a 16-bed short-term psychiatric unit at Jess Parrish will not materially influence the availability of qualified personnel for Wuesthoff. It appears that Jess Parrish will be able to staff the relatively small 16-bed unit without employing significant numbers of professional employees of Wuesthoff. Some of the relatively few patients whom Wuesthoff can be expected to lose to Jess Parrish involve referrals from Titusville-area physicians, psychiatrists, and psychologists, who will place their patients in the closer facility once it is opened. The negative impact upon Wuesthoff is outweighed in these cases by gains for the patients in continuity of care and community support. Financial Feasibility The short-term financial feasibility is good. Jess Parrish has available to it sufficient funds to undertake the relatively modest capital outlay in constructing the facility, which will consist of about 8000 square feet on an existing floor of the hospital. The long-term financial feasibility is generally good. The financial projections are based on reasonable assumptions, which are largely derived from the actual experience of Circles of Care. The projections accurately estimate revenue sources and expenses. Jess Parrish reasonably projects an adequate supply of patients from a combination of sources, including Circles of Care, existing patients whose diagnoses include psychiatric components, and numerous health-care professionals in north Brevard County. The financial projections contemplate a material contribution by Circles of Care, but project no compensating expenditures. However, this deficiency is largely offset by the likelihood that the financial participation of Circles of Care will be restricted to a share of any excess of revenues over expenses of the new project, possibly excluding reimbursement of fairly minor expenses. If that is the case, the effect of any management agreement would be only to reduce the excess of revenues over expenses enjoyed by Jess Parrish from the operation of the short-term psychiatric unit. The management agreement would not expose Jess Parrish to losses that would not have otherwise existed but for the agreement to make payments to Circles of Care. Under these circumstances, the omission of the information, although material, does not seriously cast into doubt the long-term financial feasibility of the project. Quality of Care The quality of hospital care offered by Jess Parrish is excellent. The quality of the various psychiatric services offered by Circles of Care is also excellent. Both facilities are accredited by the Joint Commission on the Accreditation of Hospitals. The issue in this case involves the quality of care to be expected in the 16-bed short-term psychiatric unit for which Jess Parrish seeks a certificate of need. Circles of Care and Jess Parrish have agreed that Circles of Care will be responsible for recruiting most of the personnel for the new program and will employ the program's medical director, who will be responsible for treatment decisions. In addition, Circles of Care will advise Jess Parrish as to the adoption of policy, which will remain ultimately the responsibility of Jess Parrish. Jess Parrish will employ the head nurse and all other full-time professional staff working in the unit. The tentativeness of the arrangement between Circles of Care and Jess Parrish is partly explained by the desire of both parties to avoid the time and expense of negotiating an agreement in every detail prior to obtaining final approval of the certificate of need. In addition, both organizations were devoting substantial time to the subject litigation, for which Circles of Care was paying a portion of the expenses. In the final analysis, the failure to work out the agreement, although not a positive feature of the application, is not a serious problem for two reasons. First, Circles of Care and Jess Parrish have a long history of mutual cooperation. The relationship began when Jess Parrish leased Circles of Care 16 hospital beds for psychiatric use. Although the arrangement ended several years ago when Circles of Care constructed its Melbourne facility, the two organizations have since cooperated in several less intensive ways. Second, although Circles of Care has superior expertise in the area of mental health, Jess Parrish qualifies by itself to operate the proposed facility. Circles of Care has already provided much of the necessary technical information required for the preparation of budgets and pro formas. Recruiting would probably take somewhat longer without Circles of Care, but the modest construction budget obviously does not involve significant debt service, so that the delay would not be costly. Perhaps the most significant loss from a quality-of-care perspective would be the medical director, whose expertise will be critical. Again, this would be largely a problem of delay only, as Jess Parrish would have to find a replacement, although it appears likely that the director may be Dr. David Greenblum, who is already a member of the active medical staff at Jess Parrish. Given the quality of care provided by Jess Parrish in the past, there is no basis for any concern that, in the unlikely event that the parties fail to negotiate an agreement, Jess Parrish would jeopardize its reputation as a quality 200-bed general hospital in order to commence prematurely a 16-bed short- term psychiatric unit. Other Factors The record does not demonstrate that there are less costly, more efficient, or more appropriate alternatives to the inpatient services proposed in the subject application. There are no crisis stabilization units or short-term residential treatment programs available in Brevard County. The proposed project will have a measurable impact only upon Circles of Care, whose existing inpatient facilities will be enhanced, and Wuesthoff, whose existing inpatient facilities will not be materially affected. In general, these existing services are being used in an appropriate and efficient manner. On the other hand, the beds that Jess Parrish seeks to convert are underutilized in their present designation. The medical/surgical beds at Jess Parrish have been utilized at a rate of less than 60% over the past three years. There are no feasible alternatives to renovation of the existing facilities. The costs and methods of proposed construction are reasonable and appropriate. The approval of the application will foster healthy competition in the area of short-term psychiatric services and promote quality assurance.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Health and Rehabilitative Services enter a Final Order granting the application of Jess Parrish for a certificate of need to convert 16 medical/surgical beds to 16 short-term adult psychiatric beds. DONE and ENTERED this 30th day of June, 1989, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-1220 Treatment Accorded Proposed Findings of Jess Parrish 1-6 Adopted or adopted in substance. 7-8 Rejected as irrelevant. 9-10 Adopted or adopted in substance. 11 Rejected as recitation of testimony and subordinate. 12-13 Adopted or adopted in substance. Rejected as irrelevant. Adopted to the extent of the finding in the Recommended Order that there likely will be an agreement between Circles of Care and Jess Parrish. Rejected as unsupported by the evidence that such an agreement exists already. Also rejected as unnecessary insofar as the application can stand on its own without the participation of Circles of Care. 15a Adopted or adopted in substance. 15b-15c Rejected as irrelevant. 15d-15g Adopted in substance, although certain proposed facts rejected as subordinate. However, the first sentence of Paragraph 15f is rejected as against the greater weight of the evidence. 15h Rejected as recitation of testimony. 16-18 Adopted or adopted in substance except that all but the last sentence of Paragraph 18g. is rejected as against the greater weight of the evidence and legal argument. 19 First sentence adopted. 19 (remainder) -22. Rejected as subordinate and recitation of evidence. Generally adopted, although most of the facts are rejected as subordinate in the overall finding and cumulative. Adopted except that sixth sentence is rejected as against the greater weight of the evidence and the seventh sentence is rejected as subordinate. Adopted in substance. First sentence adopted. Remainder rejected as irrelevant. Rejected as irrelevant. Adopted. 28a Rejected as unsupported by the greater weight of the evidence. 28b-28d Adopted or adopted in substance. and 31 Rejected as subordinate. Rejected as unnecessary. 32-50 Adopted or adopted in substance. Treatment Accorded Proposed Findings of HRS 1-11 Adopted or adopted in substance. & 14 Rejected as irrelevant. & 15-16 Adopted. 17 Rejected as unnecessary. 18-74 See rulings on Paragraphs 16-50 in preceding section. Treatment Accorded Proposed Findings of Wuesthoff 1-3 Adopted or adopted in substance. Rejected as irrelevant. Rejected as against the greater weight of the evidence and legal argument. 6-10 & 12 Adopted or adopted in substance. 11 Rejected as against the greater weight of the evidence. Rejected as recitation of testimony and cumulative. Rejected as cumulative except that second sentence is adopted. Rejected as recitation of testimony. Rejected as cumulative, subordinate, and legal argument. Rejected as cumulative except that second sentence is adopted. First clause rejected as against the greater weight of the evidence. Remainder rejected as irrelevant. Rejected as cumulative and subordinate. 20-23 Rejected as irrelevant and unnecessary. Rejected as against the greater weight of the evidence. Rejected as irrelevant and unnecessary. Rejected as cumulative. 27-28 Rejected as irrelevant and unnecessary. 29 Rejected as legal argument. 30-32 Rejected as irrelevant. 33-41 Rejected as against the greater weight of the evidence and subordinate. 42 and 51 Rejected as recitation of evidence. 43-45 Rejected as against the greater weight of the evidence. 46 Rejected as legal argument. 47-50 and 52-54 Rejected as subordinate. 55 Rejected as against the greater weight of the evidence. 56-59 Rejected as irrelevant. 60-66 Rejected as subordinate and recitation of testimony. 67-69 Rejected as against the greater weight of the evidence. 70-73 Rejected as against the greater weight of the evidence and subordinate. 74-78 Adopted. 79 Rejected as against the greater weight of the evidence. 80-82 Adopted. 83-85 Rejected as against the greater weight of the evidence. 86 Rejected as subordinate and against the greater weight of the evidence. 87-91 Adopted or adopted in substance. 92 Rejected as against the greater weight of he evidence. 93-94 Rejected as subordinate. Rejected as against the greater weight of the evidence. Rejected as irrelevant. 97-98 Rejected as against the greater weight of the evidence. Rejected as irrelevant. Rejected as subordinate. 101-102 Rejected as against the greater weight of the evidence. Rejected as partly cumulative and partly legal argument. Rejected as against the greater weight of the 105 evidence Rejected and irrelevant. as against the greater weight of the 106-108 evidence. Rejected as subordinate. 109 110-113 Rejected evidence. Rejected as against the greater weight of as subordinate. the 114-117 118-120 Rejected evidence. Rejected as against the greater weight of as irrelevant and subordinate. the 121-122 Rejected as subordinate. 123 124-125 First sentence adopted in substance. Remainder rejected as subordinate. Rejected as subordinate. 126-129 Rejected as unsupported by the greater weight of evidence. the COPIES FURNISHED: Anthony Cleveland W. David Watkins Oertel, Hoffman, Fernandez & Cole, P.A. Post Office Box 6507 Tallahassee, Florida 32314-6507 John Rodriguez 1323 Winewood Boulevard Building 1, Room 407 Tallahassee, Florida 32399-0700 William B. Wiley Darrell White McFarlain, Sternstein, Wiley & Cassedy, P.A. Post Office Box 2174 Tallahassee, Florida 32316-2174 Stephen M. Presnell MacFarlane, Ferguson, Allison & Kelly Post Office Box 82 Tallahassee, Florida 32302 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 =================================================================

Florida Laws (1) 120.57
# 7
BOARD OF NURSING vs. ROSEMARY MANN BRENNAN, 82-002556 (1982)
Division of Administrative Hearings, Florida Number: 82-002556 Latest Update: Nov. 09, 1983

The Issue This case concerns the issue of whether the Respondent's license as a registered nurse should be suspended, revoked or otherwise disciplined for submitting employment applications which contained false information and for unprofessional conduct in the performance of her duties as a nurse. At the formal hearing the Petitioner called as witnesses Janet Brown, Wilma Green, E. Jean King, Susan Coffin Brennan, Mary Ann Cottrell, and Mary Sheffield. The Respondent testified on her own behalf and was the only witness called by the Respondent. The Petitioner offered and had admitted into evidence, ten exhibits and the Respondent offered and had admitted into evidence, seven exhibits. Counsel for the Petitioner and counsel for the Respondent submitted proposed findings of fact and conclusions of law for consideration by the Hearing Officer. To the extent that those proposed findings of fact and conclusions of law are consistent with the findings made in this order, the proposed findings were adopted by the Hearing Officer. To the extent that the proposed findings and conclusions of law are not consistent with this order, they were considered by the Hearing Officer and rejected as being unsupported by the evidence or unnecessary to the resolution of this cause.

Findings Of Fact The facts set-forth in paragraphs 1 through 4 below were stipulated to by the parties and are found as facts: At all times pertinent to this proceeding, Respondent was a licensed registered nurse in the State of Florida, having been issued license number 67142-2. Respondent filled out and filed the applications for licensure as a registered nurse, Petitioner's Exhibit No. 1. Respondent did fill out and file the applications for employment as a nurse, Petitioner's Exhibit Nos. 2 through 9. Respondent did falsify her date of birth, age, and date of graduation from nursing school on her applications for employment as a nurse, Petitioner's Exhibit Nos. 2 through 9. This was done by Respondent on the recommendation of an employment agency initially, and was done in order to obtain employment. On or about April 8, 1982, Respondent filled out and submitted an employment application for work as a nurse to Lakeview Nursing Center. (Petitioner s Exhibit No. 2). The application reflected that Respondent obtained her R.N. degree from Bellevue Hospital in 1948. That information is false. The Respondent received her R.N. degree in 1939. On or about March 11, 1983, Respondent filled out and submitted an employment application for work as a nurse to Leesburg General Hospital, Leesburg, Florida (Petitioner's Exhibit No. 3). That application reflects a date of birth of December 24, 1932 and the date June, 1948 as the year Respondent received her nursing degree. This information is false in that Respondent's date of birth is September 29, 1918, and the year she received her nursing degree was June, 1939. On or about January 25, 1982, Respondent filled out and submitted an application for employment as a registered nurse to Sanford Nursing and Convalescent Center, Inc., Sanford, Florida (Petitioner's Exhibit No. 4). That application reflected a date of birth of December 24, 1932 and the year 1948 as the year in which Respondent obtained her R.N. degree. The date of birth and year of graduation are false. On or about May 28, 1980, Respondent filled out and submitted an application for employment as Director of Nursing at Orlando Memorial Convalescent Center, Orlando, Florida (Petitioner's Exhibit No. 5). That application reflected that Respondent graduated from Bellevue Hospital School of Nursing in 1948. That information is false in that she graduated in 1939. On or about February 13, 1980, the Respondent filled out and submitted an application for employment as a nurse to Quality Care, a nursing service (Petitioner's Exhibit No. 6). That application contained a false date of birth of December 24, 1932 and a false year of graduation from Bellevue Hospital School of Nursing of 1948. On or about January 23, 1980, Respondent filled out and submitted to the Physician's Registry an application for employment as a nurse (Petitioner's Exhibit No. 7). That application reflected an age of 47 and date of birth of January 24, 1932. This information is false. On or about January 8, 1980, the Respondent filled out and submitted an application for employment as a nurse to Medox, Inc. That information reflected a birth date of December 24, 1932 and a year of graduation from Bellevue Hospital as 1948 (Petitioner's Exhibit No. 8). This birthdate and year of graduation are false. On or about January 19, 1978, Respondent filled out and submitted an application for employment as a nurse to Dr. P. Phillips Memorial Nursing Home, Orlando, Florida (Petitioner's Exhibit No. 9). That application reflected an incorrect birthdate of December 24, 1932 and reflected that Respondent attended Bellevue Hospital School of Nursing from 1945 to 1948. Respondent actually attended Bellevue Hospital from 1936 to 1939. During March, 1982, Respondent was employed as a registered nurse at Leesburg Regional Medical Center. Janet Gillespie Brown, also a registered nurse, was assigned to act as Respondent's preceptor during Respondent's orientation at Leesburg Regional Medical Center. As her preceptor Ms. Brown trained as well as supervised Respondent's work during her orientation period. During the time she was employed at Leesburg Regional Medical Center, the Respondent used improper procedures in attempting to insert a foley catheter into a female patient. in cleansing the meatus to remove bacteria the Respondent used a scrubbing technique rather than a wiping technique. This was improper antiseptic technique. The Respondent then attempted to insert the catheter by probing. This also was improper. Upon observing these improper techniques Janet Brown instructed Respondent to make no further attempts to insert the catheter and told her to wait whale she obtained a sterile foley kit which she would insert herself. Respondent did not do as she had been instructed and inserted the catheter after Nurse Brown left the patient's room to obtain the sterile foley kit. After Nurse Brown returned and discovered the catheter had been inserted against her instructions, she went outside the patient's room with Respondent and explained to her that the catheter she inserted was contaminated as a result of the probing. Respondent agreed and explained that she had not performed this procedure for awhile. The ability to properly insert such catheters is a basic nursing skill. No infection resulted from the improper insertion of the catheter by Respondent. Also while employed at Leesburg Regional Medical Center the Respondent failed to properly chart food intake of patients in that she charted each item of food consumed rather than charting percentages of food consumed as she had been instructed. Respondent also failed to properly chart the progress of a stroke patient by failing to chart that the patient had been making attempts to verbally communicate. The Respondent failed to properly organize her time, appeared unable to properly assess patient progress by asking appropriate questions and recording the patient's response, and failed to complete daily assignments such as bed baths and picking up food trays. Respondent did not feel capable of starting an IV (intravenous). Although starting an IV was not considered to be a skill required of Respondent by Leesburg Regional Medical Center, Respondent was unable to change the tubing on an IV and this was a skill expected of her. Respondent was also unable to give accurate counts of the remaining amount of solution in patients' IVs. On one occasion Respondent failed to properly chart the time of the doctor's visit and apparently "switched" the time. Respondent increased the IV flow for a patient as requested by the doctor, but charted the doctor's visit as having occurred later than the time at which she increased the IV. While working at Leesburg Regional Medical Center the Respondent failed to meet the minimal standards of acceptable and prevailing nursing practice. During the first part of February, 1982, Respondent was employed as a relief charge nurse at Sanford Nursing and Convalescent Center, Sanford, Florida. Ms. E. Jean King, R.N. was a charge nurse at Sanford Nursing and Convalescent Center and was assigned to assist in Respondent's orientation. While at Sanford Nursing and Convalescent Center, Respondent was observed by Ms. King to be very confused and very disorganized in her work. She could not remember patients' names and in passing out medications failed to medicate some patients. Then asked whether or not a particular patient had been given medication, Respondent became confused and indicated she could not remember whether or not the medication had been given. In taking a phone order from a doctor the Respondent wrote the wrong order on a sheet of paper and could not then remember what medication had in fact been ordered. This necessitated calling the doctor back and having the order repeated. Respondent also administered medications without first taking the pulse and blood pressure of the patient as required. Respondent required much more supervision than the other nurses under Ms. King's supervision. Respondent's performance and nursing practice at Sanford Nursing and Convalescent Center failed to meet the minimal standards of acceptable and prevailing nursing practice in Florida. On January 12 and January 27, 1980, Respondent as an employee of Medox, Inc., was assigned to Florida Hospital in Orlando, Florida. At the time she reported for work Respondent was informed by Ms. Ann Cottrell, R.N. (Head Nurse in Special Care at Florida Hospital) about what her responsibilities would be during her shift as team leader in the progressive care unit. The duties outlined to Respondent included responsibility for the administration of IV medications, antiequivalent drugs, insulin and any other specific procedures not within the job description of the licensed practical nurses. Respondent was also instructed that she was responsible for ordering IV medications that were to be administered for the next twenty-four (24) hours, that she was to make rounds with the physicians and observe and report the patients' conditions, and that at the end of the shift she was responsible for making certain that all charts were signed off, the doctor's orders were signed off, and any pertinent information included in the nurse's notes. During the course of the day Ms. Cottrell checked back with Respondent several times and asked if she understood her responsibilities and whether she was having any problems. Each time Respondent indicated that she knew what she was doing and had done it many times. During the course of the day the Respondent failed to make a complete report on the patients and as a result, the three to eleven shift was unable to determine what had happened during the day with regard to the patients for which Respondent was responsible. Medications had not been charted properly and many of the notes entered by Respondent were irrelevant to the patient's progress. Respondent also failed to insure that EKG strips for which she was responsible had been read. Ms. Cottrell, a registered nurse, was qualified to express an opinion as to the prevailing standards of nursing practice in Florida. She testified that in her opinion the Respondent was not qualified to work in an acute care area as a nurse and that her performance of her duties at Florida Hospital failed to meet the minimal standards of acceptable nursing practice in the State of Florida. This opinion is accepted by the Hearing Officer.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Respondent's license as a registered nurse be suspended for a period of three (3) months. It is further RECOMMENDED that upon completion of the three-month suspension period, Respondent be placed on probation for a period of one (1) year working only under the supervision of another licensed nurse and upon such other conditions as the Board may specify. DONE and ENTERED this 29 day of August, 1983, in Tallahassee, Florida. MARVIN E. CHAVIS Hearing Officer Department of Administration Division of Administrative Hearings Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29 day of August, 1983. COPIES FURNISHED: Julia P. Forrester, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Arthur Baron, Esquire Attorney at Law 14 East Washington, Ste. 623 Orlando, Florida 32801 Helen P. Keefe, Executive Director Florida Board of Nursing Room 504, 111 East Coast Line Drive Jacksonville, Florida 32202 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (1) 464.018
# 8
BOARD OF MEDICAL EXAMINERS vs. DAVID AMSBRY DAYTON, 87-000163 (1987)
Division of Administrative Hearings, Florida Number: 87-000163 Latest Update: Jul. 08, 1987

Findings Of Fact At all times relevant hereto Respondent was licensed as a physician in the State of Florida having been issued license number ME0040318. Respondent completed a residency in internal medicine and later was a nephrology fellow at Mayo Clinic. He was recruited to Florida in 1952 by Humana. In 1984 he became associated with a Health Maintenance Organization (HMO) in an administrative position but took over treating patients when the owner became ill. This HMO was affiliated with IMC who assimilated it when the HMO had financial difficulties. At all times relevant hereto Respondent was a salaried employee of IMC and served as Assistant Medical DIRECTOR in charge of the South Pasadena Clinic. On October 17, 1985, Alexander Stroganow, an 84 year old Russian immigrant and former cossack, who spoke and understood only what English he wanted to, suffered a fall and was taken to the emergency Room at a nearby hospital. He was examined and released without being admitted for inpatient treatment. Later that evening his landlady thought Stroganow needed medical attention and again called the Emergency Medical Service. When the ambulance with EMS personnel arrived they examined Stroganow, and concluded Stroganow was no worse than earlier when he was transported to the emergency Room, and refused to again take Stroganow to the emergency Room. The landlady then called the HRS hotline to report abuse of the elderly. The following morning, October 18, 1985, an HRS case worker was dispatched to check on Stroganow. Upon arrival, she was admitted by the landlady and found an 84 year old man who was incontinent, incoherent, and apparently paralyzed from the waist down, with whom she could not engage in conversation to determine his condition. She called for a Cares Unit team to come and evaluate Stroganow. An HRS Cares Unit is a two person team consisting of a social worker and nurse whose primary function is to screen clients for admission to nursing homes and adult congregate living facilities (ACLF). The nurse on the team carries no medical equipment such as stethoscope, blood pressure cuff, or thermometer, but makes her evaluation on visual examination. Upon arrival of the Cares Unit, and, after examining Stroganow, both members of the team agreed he needed to be placed where he could be attended. A review of his personal effects produced by his landlady revealed his income to be above that for which he could qualify for medicaid placement in a nursing home; that he was a member of IMC's Gold-Plus HMO; his social security card; and several medications, some of which had been prescribed by Dr. Dayton, Respondent, a physician employed by IMC at the South Pasadena Clinic. The Cares team ruled out ACLF placement because Stroganow was not ambulatory, but felt he needed to be placed in a hospital or nursing home and not left alone with the weekend approaching. To accomplish this, they proceeded to the South Pasadena HMO clinic of IMC to lay the problem on Dr. Dayton, who was in charge of the South Pasadena Clinic, and, they thought, was Stroganow's doctor. Stroganow had been a client of the South Pasadena HMO for some time and was well known at the clinic as well as by EMS personnel. There were always two, and occasionally three, doctors on duty at South Pasadena Clinic between 8:00 and 5:00 daily and, unless the patient requested a specific doctor he was treated by the first available doctor. Stroganow had not specifically requested to be treated by Respondent. When the Cares unit met with Respondent they advised him that Stroganow had been taken to Metropolitan General Hospital Emergency Room the previous evening but did not advise Respondent that the EMS squad had refused to return Stroganow to the emergency Room when they were recalled for Stroganow the same evening. Respondent telephoned the Metropolitan General Emergency Room and had the emergency Room medical report on Stroganow read to him. With the information provided by the Cares unit and the hospital report, Respondent concluded that Stroganow needed emergency medical treatment and the quickest way to obtain such treatment would be to call the EMS and have Stroganow taken to an emergency Room for evaluation. When the Cares unit arrived, Respondent was treating patients at the clinic. A clinic, or doctors office, is not a desirable or practical place to have an incontinent, incoherent, and non-ambulatory patient brought to wait with other patients until a doctor is free to see him. Nor is the clinic equipped to perform certain procedures that may be required for emergency evaluation of an ill patient. At a hospital emergency Room such equipment is available. EMS squads usually arrive within minutes of a call being placed to 911 for emergency medical treatment and it was necessary that someone be with Stroganow when the EMS squad arrived. Accordingly, Respondent suggested that the Cares team return to Stroganow and call 911 to transport Stroganow to an emergency Room for an evaluation. Upon leaving the South Pasadena clinic the Cares team returned to Stroganow. Enroute they stopped to call a supervisor at HRS to report that the HMO had not solved their problem with Stroganow. The supervisor then called the Administrator at IMC Tampa Office to tell them that one of their Gold-Plus HMO patients had an emergency situation which was not being property handled. Respondent left the South Pasadena Clinic around noon and went to IMC's Tampa Office where he was available for the balance of the afternoon. There he spoke with Dr. Sanchez, the INC Regional Medical Director, but Stroganow was not deemed to be a continuing problem. By 2:00 p.m. when no ambulance had arrived the Cares Unit called 911 for EMS to take Stroganow to an emergency Room. Upon arrival shortly thereafter the EMS squad again refused to transport Stroganow. The Cares team communicated this to their supervisor who contacted IMC Regional Office to so advise. At this time Dr. Sanchez authorized the transportation of Stroganow to Lake Seminole Hospital for admission. Although neither Respondent nor Sanchez had privileges at Lake Seminole Hospital, IMC had contracted with Lake Seminole Hospital to have IMC patients admitted by a staff doctor at Lake Seminole Hospital. Subsequent to his meeting with the Cares team Respondent received no further information regarding Stroganow until well after Stroganow was admitted to Lake Seminole Hospital. No entry was made on Stroganow's medical record at IMC of the meeting between Respondent and the Cares Unit. Respondent was a salaried employee whose compensation was not affected by whether or not he admitted an IMC Gold-Plus patient to a hospital.

Florida Laws (1) 458.331
# 9

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer