CONSTRUCTION INDUSTRY LICENSING BOARD vs. ARJAN D. CHANDWANI, 84-001298 (1984)
Division of Administrative Hearings, Florida Number: 84-001298 Latest Update: Dec. 04, 1990

The Issue The issue presented for decision herein is whether or not Respondent's certified general contractor's license should be revoked, suspended, or otherwise disciplined based on conduct set forth in two Administrative Complaints filed herein dated March 14 and July 19, 1984.

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, documentary evidence received and the entire record compiled herein, I hereby make the following relevant factual findings. At all times material hereto, Respondent was a certified general contractor in Florida and has been issued license number CGC 015834. 3/ (Petitioner's Exhibit 1) Petitioner is an agency of the State of Florida responsible for enforcing the provisions of Chapter 489, Florida Statutes, relating to the imposition of licensure standards and standards for the practice of contracting. During times material hereto, Respondent was a full-time employee of the Metropolitan Dade County Aviation Authority. At no time during his employment with the authority did Respondent advise the Dade County Aviation Authority that he was performing work outside the scope of his employment while on County time. When confronted with the results of an investigation undertaken by the Dade County Attorney's Office in June of 1983 with regard to his (Respondent's) possible violation of the Code of Metropolitan Dade County, Respondent resigned from his position with the County. (Tr. pages 101-102) DOAH CASE NO. 84-1298 During late February, 1983, Albert Kairy contracted with an unlicensed contractor for the closure of a carport at his residence located in North Miami, Florida. After observing Respondent's classified advertisement in a local flier, Kairy contacted Respondent with regard to preparing necessary blueprints for the enclosure. Kairy contracted with Respondent to prepare both the blueprints and to supervise the activities of the unlicensed contractor. The contract amount was $400. On February 25, 1983, Kairy received an owner/builder permit for the carport enclosure from the City of North Miami. (Tr. pages 7-10, 93) Subsequently, problems began to develop with work performed by the unlicensed contractor and Respondent persuaded Kairy to dismiss that individual and to retain him as the contractor. On March 7, 1983, Respondent entered into a contract with Kairy to construct a room addition to the residence. (Petitioner's Exhibit 2) The project was to be completed pursuant to plans and specifications approved by the City of North Miami. The contract called for a bedroom addition; an additional bathroom and a utility room. The contract included extending the carport wall approximately 101 feet. The contract price was $14,500 which included an advance of $2,500. On March 12, 1983, Respondent entered into a second construction contract with Kairy. (Petitioner's Exhibit 3, Tr. 19) The contract price was $15,000. Except for the increase in the contract price, Kairy was led to believe that the terms and conditions of the second contract were substantially similar to the contract previously executed by the parties on March 7, 1983. However, Respondent reduced the extension of the carport wall to 10 feet and Respondent did not inform Kairy of this reduction. (Tr. page 48) The contract called for draw payments as follows: $4,000 as a downpayment/advance; $3,000 upon completion of slab and block walls; $1,500 upon completion of piping and tie-columns; $2,500 upon completion of partition and drywall; $3,000 upon completion of the roof, and $1,000 upon completion of the job. (Petitioner's Exhibit 3) Respondent subsequently applied for a permit from the City of North Miami. The City of North Miami denied Respondent's application because Respondent failed to comply with the Dade County licensing requirements. (Tr. pages 21-22) Although Respondent acted in the capacity of a general contractor, he (Respondent) requested that Kairy obtain a owner/builder permit. Upon applying for the owner/builder permit, the City cancelled the original permit for the carport enclosure. (Tr. page 94) Kairy obtained the owner/builder permit pursuant to Respondent's assurances the permit would be properly transferred to Respondent's contracting license. The City provided Kairy with a "hold harmless letter" for Respondent to execute. (Petitioner's Exhibit 4) Upon presentation of that letter by Kairy to Respondent, Respondent refused to execute the "hold harmless letter." (Tr. pages 22-24) Subsequently, Kairy and Respondent executed an addendum to the construction contract. The addendum involved changing the enclosures roof structure from shingle to barrel tile. This change involved a price difference of $1,950 and increased the total contract price to $16,950. (Petitioner's Exhibit 5, Tr. pages 31-32) The addendum was executed after completion of the tie-beam and tie- column portion of the construction project. Pursuant to the terms and conditions of the March 12, 1983 construction contract, Kairy provided Respondent with the following amounts: $4,000 as an advance/downpayment on March 21, 1983; ($2,500 under the March 7 contract plus an additional $1,500); $3,000 upon completion of the slab and block work; $400 for preparation of the original set of plans; $500 toward tinted windows; $1,500 upon completion of the tie-beam and tie- column; $1,500 as an advance on the barrel tile roof; and $1,500 as an advance upon the completion of the roofs. (Petitioner's Exhibit 6) Kairy paid Respondent a total of $12,400 on the total contract price of $16,950 or approximately 73 percent of the contract price. Kairy timely remitted to Respondent installment payments for the slab and block work, tie- beam and tie-columns and advanced Respondent $3,000 towards completion of the roof. During April, 1983, Respondent commenced construction for enclosing the roof structure. Respondent ceased all construction activity upon being informed (by Kairy) that he would no longer pay Respondent in cash. (Tr. page 44) Respondent refused to accept payment in any form other than cash and offered no explanation, reason or excuse to Kairy for the cessation of work on this project. Kairy offered several reasons for his refusal to pay contract installments in cash. First, Respondent refused to execute the hold harmless letter provided by the City of North Miami and Respondent failed to properly supervise the construction activities by, among other things, disappearing from the project for a period of approximately three weeks. Finally, Respondent requested additional advances on the contract while the project was not progressing as scheduled. (Tr. pages 28, 44-46) Respondent did not return to the construction site after Kairy refused cash payments. On July 20, 1983, Respondent's roofing subcontractor filed a claim of lien against Kairy's property in the amount of $1,210. (Petitioner's Exhibit 8) Respondent has failed to satisfy the claim of lien and Kairy is in the process of satisfying that claim. (.Tr. page 54) Respondent also failed to pay an electrical subcontractor for services provided in the amount of $965. (Petitioner's Exhibit 7) Again, Kairy is currently in the process of satisfying that debt and Respondent refuses to honor that obligation. (Tr. 57) Kairy reimbursed the plumbing subcontractor in the amount of $675 after Respondent's personal check was returned due to insufficient funds. (Tr. page 62 and Petitioner's Exhibit 9) On April 1, 1983, the City of North Miami Building Department inspected the foundation and slab. On April 18, 1983, the Building Department inspected the tie-beam and columns. On May 6, 1983, the City of North Miami Building Department performed a tin-cap inspection on the enclosure roof. The City of North Miami Building Department estimated the actual construction completed when Respondent left the project and determined that it was approximately 70 percent complete. Completed construction included the slab, foundation, walls and tie-beam. Little interior construction work had been performed and drywall and partition walls were only partially complete. Kairy has either expended or will be required to expend the following sums in connection with the contract with Respondent: $12,400 - the amount paid directly to Respondent; $1,210 - the amount of the roofer's lien; $965 representing the amount owed to the electrician; and $675 representing the amount Kairy paid the plumbing subcontractor for a total of $15,250. 4/ Although Respondent completed approximately 70 percent of the actual construction, Kairy will correspondingly be required to expend approximately 90 percent of the contract price over and above monies paid to Respondent to complete this project. DOAH CASE NO. 84-3202 On May 12, 1983, the City of Miramar issued William Borden an owner/builder permit for the construction of a four-bedroom, three-bath home to be located in Miramar, Florida. (Petitioner's Exhibit 8) Between May and October, 1983, the Bordens performed the site preparation necessary for pouring the building's foundation and slab. After observing Respondent's classified advertisement in a local flier, the Bordens contacted Respondent with regard to the construction of their home. (Tr. page 16) On November 11, 1983, Respondent contracted with the Bordens to provide certain contracting services relative to the construction of their home. The Bordens contracted Respondent to pour the foundation and slab, perform the block work, frame and pour the tie-beam and tie-columns. (Petitioner's Exhibit 3, Tr. pages 18-20) The Bordens were to complete all of remaining construction of their home) The contract price was approximately $16,810. On October 17, 1983, the City of Miramar issued William Borden an owner/builder permit. (Petitioner's Exhibit 7) William Borden was to install the rough plumbing prior to Respondent pouring the foundation and slab. (Tr. 33) Due to certain time constraints, Respondent offered to install the rough plumbing. On October 25, 1983, Respondent received $475 from the Bordens toward installation of the rough plumbing. Respondent failed to subcontract the installation of the rough plumbing and failed to obtain the necessary building permit. On November 8, 1983, the Bordens provided Respondent an additional $470 representing final payment for installation of the rough plumbing. (Petitioner's Exhibit 4) On November 1, 1983, Mr. Bill Lafferty, chief building and mechanical inspector for the City of Miramar, performed an inspection of the rough plumbing work performed for the Bordens by Respondent. Lafferty determined that Respondent had failed to install the rough plumbing in accordance with provisions of the South Florida Building Code as adopted by the Broward County Code. As a consequence, Lafferty required Respondent to remove and reinstall the rough plumbing in accordance with applicable building code provisions. On November 7, 1983, Lafferty reinspected and approved the rough plumbing as reinstalled by Respondent. (Tr. pages 51-55) Respondent reinstalled rough plumbing at the Borden residence during the first week of November, 1983. Respondent did not obtain a building permit prior to reinstalling the rough plumbing. On November 16, 1983, the City of Miramar levied against Respondent a fee totalling $163.45. Part of that levy included $63.45 for renewal of the building permit and reinspection fee, and the remaining $100 represented a fine against Respondent for failing to properly obtain a building permit. (Tr. pages 58, 64 and Petitioner's Exhibit 7) On November 10, 1983, Salvatore Jenco, structural building inspector for the City of Miramar Building Department, inspected and approved the footing slab for the Borden residence. Subsequently, Respondent poured the concrete slab and foundation. Respondent did not obtain the requisite building permit prior to proceeding with construction. Respondent could not properly proceed with construction pursuant to William Borden's owner/builder permit. On November 11, 1983, inspector Jenco reinspected the concrete slab and foundation as poured by Respondent. As a result of that inspection, Jenco ordered all construction activities to be stopped at the Borden project. Specifically, Respondent materially deviated from the architect's plans and specifications by failing to pour a monolithic (continuous) slab and foundation for the Borden residence. As result of that deviation, the structural integrity of the building was compromised. (Tr. pages 71-73) Construction activity at the Borden residence was halted approximately three weeks while the Borden's architect developed a new set of blueprints. After the City approved the revised blueprints, Respondent began laying blocks and framing the tie-beam. Subsequently, Respondent requested Sunshine Concrete Company to commence pouring the tie-beam. The concrete company requested payment in cash due to the fact that Respondent had previously tendered a check to Sunshine Concrete Company which was returned due to insufficient funds. When informed of the concrete company's demands, the Respondent ordered the company to cease pouring the tie-beam. Upon being informed the tie-beam required a continuous pour, Respondent left the construction site and the Bordens were required to directly reimburse the concrete company. Respondent abandoned the project and has not returned to the construction site. Respondent owes the Bordens approximately $4,696 in reimbursed expenses. (Tr. pages 40-42) Respondent's Defense In DOAH Case No. 84-1298, Respondent did not offer any testimony to refute or otherwise rebut the allegations set forth in the Administrative Complaint. Respondent refused to be placed under oath when he made statements as to his position in Case No. 84-3202.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent's certified general contractor's license be suspended for a period of two (2) years. Additionally, Respondent shall pay to the Construction Industry Licensing Board an administrative fine in the amount of $2,500. However, if Respondent provides the Construction Industry Licensing Board with sufficient evidence indicating settlement and satisfaction of the existing disputes between Mr. Albert Kairy and Mr. and Mrs. William Borden, the suspension shall be reduced to one (1) year after which time it is recommended that his license be reinstated. RECOMMENDED this 8th day of May, 1985, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 9th day of May, 1985.

Florida Laws (4) 120.57489.105489.113489.129
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. CLAUDE R. WEBB, 82-002614 (1982)
Division of Administrative Hearings, Florida Number: 82-002614 Latest Update: Sep. 20, 1984

Findings Of Fact Respondent is a certified building contractor having been issued license No. CE C014020. Be was so licensed and was the qualifier for ARC Construction, Inc. at all times material to this proceeding. On July 25, 1980, Respondent, on behalf of ARC Construction, Inc., contracted with Mr. and Mrs. Richard Doyle to remodel a residence in St. Petersburg. The contract price was $43,180, plus extras of $1,525. Respondent was paid $1,500 initially and received draw payments of $4,318 on August 11, 1980, $8,636 on August 19, 1980, and $10,795 on September 3, 1980. These payments totaled $25,249, or about 58 percent of the basic contract amount and 56 percent of the contract price with add-ons. Respondent was obligated to pay suppliers and acknowledged this responsibility to the complainant, Mr. Richard Doyle, but advised him that he was having cash flow difficulties. Respondent's checks to Scotty's, dated August 10, 1980, for $2,518.28, and August 22, 1980, for $738.99, were dishonored by the bank. His check for approximately $5,000 to Florida Forest Products was likewise returned. Respondent failed to settle these accounts and the complainant was eventually obliged to do so in order to remove the liens on his property. Respondent ceased work on the project in mid-October, 1980, and was terminated by the complainant in January, 1981. At the time Respondent ceased work the project was 50 percent to 80 percent complete.

Recommendation Based on the foregoing, it is RECOMMENDED: That Petitioner enter a Final Order dismissing the Administrative Complaint. DONE and ORDERED this 29th day of April, 1983, in Tallahassee, Florida. R. T. CARPENTER, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of April, 1983. COPIES FURNISHED: John O. Williams, Esquire 547 North Monroe Street Suite 204 Tallahassee, Florida 32301 James H. Thompson, Esquire 620 Madison Street Suite 2-C Tampa, Florida 33602 James Linnan, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32202 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (1) 489.129
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs DAVID P. MILLER, D/B/A GREAT SOUTHERN CONSTRUCTION AND DEVELOPMENT, INC., 92-007413 (1992)
Division of Administrative Hearings, Florida Filed:Sanford, Florida Dec. 15, 1992 Number: 92-007413 Latest Update: Aug. 08, 1994

The Issue The issue for consideration in this hearing is whether Respondent's license as a certified building contractor should be disciplined because of the matters set out in the Administrative Complaint.

Findings Of Fact At all times pertinent to the allegations herein, Petitioner was the state agency responsible for the regulation of the construction industry in Florida. Respondent, David P. Miller, was licensed as a certified building contractor under license number CB C039127 and was doing business as Great Southern Construction and Development, Inc. On March 14, 1988, Robert Crowley, a semi-retired real estate broker and promoter, and Treasurer of Enterprise Industrial Park, Inc., (EIP), entered into contracts with the Respondent to construct three buildings, A, B, and H, for it within the park boundaries. Building A was to house offices and retail space; building B was to house warehouse and offices; and building C was to house garage space. The construction was to be financed by an infusion of shareholders' money and by a construction loan from the Southland bank in the amount of $375,000.00. The loan was ultimately increased to $614,000.00 so that EIP could begin development of phase II of the park. The contracts provided for Respondent to be paid $110,000.00 for Building A, $67,000.00 for Building B, and $52,807.00 for Building H. The loan was obtained in phases. The developers had outlined the project to bank officials who approved it, initially, for development of the park and construction of four buildings. Phase one was to include the roadway and one building. When that was completed, the other buildings were to be erected. Site preparation was accomplished by John T. Day. Most of the site preparation was completed before Respondent started construction. Thereafter, as work progressed, Respondent periodically certified to the bank what work had been done and that suppliers had been paid. Upon receipt of that certification, the bank would issue a check for the appropriate amount to EIP which would, thereafter, issue its own check to Respondent. There was an exception, however, in the case of payments to Ludwig Steel. Whereas that supplier would bill Respondent for small items delivered, it demanded payment by cashiers' check upon delivery for major structural steel fabrications. These checks, for steel for Buildings A and B, were for $18,511.84 and $17,716.84, were issued by Southland Bank, at the request of EIP. During the course of his performance of the contracts for the construction of Buildings A, B, & H, Respondent executed several of the above mentioned certification forms. For Building H: These included: a. August 30, 1988 $ 9,505.00 b. October 4, 1988 9,505.00 c. October 17, 1988 9,505.00 d. December 28, 1988 11,881.50 e. January 31, 1989 9,437.50 TOTAL $49,834.00 Prior to these certificates, the bank also released $90,000 in advances for start up costs and the loan in March, April and May, 1988. In addition to the certificates listed above, Respondent also signed certificates for Building A totalling $91,446.00 as follows: a. August 30, 1988 $ 19,800.00 b. October 4, 1988 19,800.00 c. October 17, 1988 19,800.00 d. December 28, 1988 24,750.00 e. January 31, 1989 7,296.00 TOTAL $ 91,446.00 Respondent also signed additional certificates for Buildings B as follows: a. December 28, 1988 $ 46,642.00 b. January 31, 1989 28,031.00 c. March 1, 1989 28,031.00 TOTAL $102,704.00 These certificates were also signed by the architect, Mr. Wilcockson. In fact, they were not correct in that not all the work had been done and not all suppliers had been paid. Respondent admits to falsely signing the certificates but claims he was urged to do so by representatives of EIP who indicated to him it was just a routine procedure. Consequently, even knowing the certificates were not accurate, he signed them because he wanted to get paid. It is found, however, that Respondent has been a licensed contractor for a number of years and knew the implications of his actions. His attempts at justification for his actions are neither credible nor impressive. Construction progressed satisfactorily and without major problems up to the time for the last draw. At that point, the bank declined to issue a check to EIP for the construction of Building C, also to be erected on the site, when it became aware that numerous liens had been filed by subcontractors and materialmen indicating Respondent's failure to make satisfactory payment for buildings A, B, and H. These liens included claims by: American Roll-Up Door Co. $ 3,630.00 B & B Painting Contractors 3,020.00 Blackton, Inc., 5,820.73 Brownie Septic Tank Contractors #1 1,025.00 Brownie Septic Tank Contractors #2 1,025.00 Brownie Septic Tank Contractors #3 1,635.00 Don Alan Dinora 930.00 Energy Savings Systems, Inc. 10,750.00 Florida Mining & Materials 2,388.31 Mid Florida Air Conditioning, Inc. 3,982.00 Neeley-Built Structures, Inc., 4,995.78 Residential Building Supply 7,857.11 Total $47,058.93 Mr. Crowley claims the above liens were satisfied by EIP, and it is so found. He claims EIP also paid some subcontractors who did not file liens because of a desire to help small contractors who otherwise would not have been paid. No figures were available to support that latter claim, however, and it is not considered to be probative of any issue. It is found, however, that Respondent paid Neeley-Built the amount of $4,995.78 and the claim of lien form included within Petitioner's exhibit of filed liens refers to property other than that in issue here. In addition, the $10,750.00 lien of Energy Savings Systems is not totally attributable to services or materials for the instant project. It is estimated that 60 percent of that amount relates to work done outside the three contracts in issue here. Further, only $1,700.00 of the lien of Residential Building Supply relates to material provided for the work done by Respondent under these contracts. The balance relates to work done outside the original contract limits. Over the course of the contracts, EIP paid Respondent, in addition to a deposit of $25,786,99 for Bldgs. A & H, the sums below, for a total of $259,006.72 for Bldgs. A, B, & H: a. Aug. 31, 1988 $19,800.00 for Bldg. A b. Aug. 31, 1988 9,505.00 for Bldg. H c. Oct. 05, 1988 10,793.16 for Bldg. H & A d. Oct. 17, 1988 29,305.99 for Bldg. A & H e. Dec. 14, 1988 19,000.00 f. Dec. 29, 1988 49,417.06 g. Feb. 06, 1989 7,296.00 for Bldg. A h. Feb. 06, 1989 28,310.00 for Bldg. B i. Feb. 06, 1989 9,473.50 for Bldg. H j. Feb. 10, 1989 2,350.00 for misc. k. Feb. 15, 1989 20,000.00 l. Mar. 03, 1989 28,031.00 for Bldg. B In addition to those payments, EIP also paid $16,000.00 to Benson Drywall on December 12, 1988 at the request of Respondent. The total paid by EIP, either to or on behalf of the Respondent, was: $ 25,786.00 deposit 233,280.72 to Great Southern 16,000.00 Benson Drywall 36,228.68 Ludwig Steel $311,295.40 TOTAL Mr. Crowley was not the main source of corporate funds. The President of the company is a Mr. Nelson who was the "money man." Contractor selection was by agreement between Nelson and Crowley, but Crowley was the supervisor of the contracts and did most of the negotiating with Respondent. The work stipulated in the contracts between EIP and Respondent was not the only work called for in their relationship. The contracts provided for the basic construction but Mr. Crowley requested Respondent to perform additional work in or around buildings A, B, and H, which included: Tenant improvements in buildings A and B valued at $23,000 excluding labor; Additional site work including electrical, telephone, grading and filling, berm modification, concrete sidewalks and parking buffers, and repair of damaged concrete (all but the repair of concrete was the result of the failure of the original site preparation contractor to properly complete his work); Negotiations and discussions with Volusia County regarding the sewer/septic system necessary for the project. In addition to the $23,000.00 for tenant improvements mentioned in the paragraph next above, Respondent also paid out of pocket to the following contractors and suppliers for work outside the scope of the original contracts: a. Ludwig Metal Buildings $ 3,000.00 b. Concrete 3,840.00 c. John Bates & family 6,497.73 d. Four Seasons 1,190.00 e. Will Cox 975.00 f. Riley 3,100.00 All Star Electric 4,705.32 Jerry's Concrete Service 1,350.00 TOTAL $24,658.05 Though the contracts referenced in this proceeding pertain to construction of Buildings A, B, & H, Respondent was also retained to erect a metal building to be designated C. Respondent received a total of $253,000.00 from EIP to construct those buildings for which he had the initial contracts and also to put up the metal building, C. The cost to complete Building C was $45,500.00 but EIP had remaining only slightly over $6,000.00 to pay for that work. Respondent did substantial work for EIP which was over and above the services called for under the contracts for Buildings A, B, & H as amended by the change orders for which he was not paid because Mr. Crowley advised him no additional monies were available. For example, he and his brother, Thomas, did additional site work valued by him at $24,260.00; and additional labor and services on the septic and sewer system problems valued by him at $5,600.00 and for tenant improvement, valued by him at $5,000.00. Here, however, it must be noted that the figures cited are not documented by any supporting material and contain significant amounts for his labor which he priced at $90.00 per hour. Mr. Miller, during his relationship with EIP, purchased a 10 percent interest in the firm. He originally filed his own lien on the property for $80,364.00 based on the contracts he had in hand and the site work which he valued at $18,000.00. He claims he subsequently withdrew his lien without being paid so that the limited funds available could be used to pay the subcontractors. No corroborating evidence on this point was introduced, however. Mr. Miller's contracting license was, subsequent to the incidents herein, placed in inactive status and currently remains so. He is not now engaged in contracting and claims he does not intend to do so in the future. His motivation in contesting the allegations against him is, he claims, solely to clear his good name and reputation.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED THAT the Respondent, David P. Miller, d/b/a Great Southern Construction and Development, Inc. pay an administrative fine of $3,750.00 and be reprimanded. RECOMMENDED this 9th day of November, 1993, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of November, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 92-7413 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: 1. & 2. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. & 6. Accepted and incorporated herein. 7. - 14. Accepted and incorporated herein. 15. - 17. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. & 21. Accepted and incorporated herein. 22. - 24. Accepted and incorporated herein. 25. & 26. Accepted. FOR THE RESPONDENT: Accepted and incorporated herein. & 3. Accepted and incorporated herein. Rejected as the total amount paid by EIP for the buildings constructed by Respondent. The figure is somewhat higher due to deposit and amounts paid to suppliers by EIP. Accepted and incorporated herein. * At this point, Respondent's proposed Findings of Fact become misnumbered. There are two numbers 5. The subsequent numbers are as reflected in Respondent's submittal. 5. - 9. Accepted and incorporated herein. 10. - 12. Accepted and incorporated herein. 13. - 15. Accepted and incorporated herein. 16. Accepted. 17 & 18. Accepted. Alleged but not proven. Accepted. Rejected as contra to the weight of the evidence. Accepted and incorporated herein. COPIES FURNISHED: Tracy Sumner, Esquire William S. Cummins, Esquire Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Kurt R. Borglum, Esquire 366 East Graves Avenue, Suite B Orange City, Florida 32763 Jack McRay General Counsel Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Daniel O'Brien Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202

Florida Laws (2) 120.57489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. CLARENCE S. TATE, 84-000992 (1984)
Division of Administrative Hearings, Florida Number: 84-000992 Latest Update: Dec. 04, 1990

Findings Of Fact Respondent holds certification with the Florida Construction Industry Licensing Board as a general contractor and a registered roofing contractor, having been issued license numbers CG C009484 and RC0043155, respectively. Tate has qualified a company known as Allstate Roofing and Construction, Co., under the terms of the aforementioned licenses, and at times relevant to this inquiry, operated under that company name. On February 17, 1983, respondent through his business name, Allstate Roofing and Construction, contracted with Wayne Lackey to furnish the necessary labor and materials to build a 28' by 78'brick-veneered housing shell in Clay County, Florida. The specified amount of the contract was $34,365 to be paid in four equal draws, or installments, in the amount of $8,591.25, following the completion of work related to each of the phases. In accordance with the contract terms, Lackey paid the respondent three draws in the amount of $8,591.25, upon assurances that respondent had satisfied the expenses related to subcontractors, suppliers, and materialmen. Respondent requested advance payment of the final draw and indicated to Lackey that this money was to be used to pay for materials related to the construction of the housing shell. Lackey complied with this request and made two advanced payments on the fourth draw in the amount of $2,700 and $500. The total amount of the three draws and the advance payments related to the fourth draw was $28,973.75. At the point of paying the advance on the fourth draw, Tate had also told Lackey that all subcontractors, materialmen and suppliers had been paid, and indicated to Lackey that a written lien affidavit acknowledging that all the costs had been satisfied would be provided to Lackey at the conclusion of the construction. While respondent was still obligated under the terms of the contract, Lackey began to receive phone calls and statutory notices of intentions on the part of materialmen, subcontractors and suppliers indicating that they would lien the homesite of the owner, Lackey. These demands were made on the basis that several of these claimants had not been paid for services or' supplies. When Lackey confronted the respondent, the respondent initially told Lackey to ignore those notices and that they had been paid on checks drawn on the Allstate account. In fact, the claimants had either not been paid, or had been paid with checks upon which insufficient funds were available to honor the checks drawn on respondent's business account. Under the circumstances, the claimants continued to press Lackey for satisfaction of their claims for labor and supplies. As a consequence the Lackey's had to expend money of their own to satisfy the contract conditions on the subject of costs for services by subcontractors, materialmen, and suppliers. These costs should have been defrayed by respondent pursuant to the terms of the contract. Some of the expenses, which are recounted below, were expenses incurred prior to the respondent's entitlement to his fourth draw. Payments by the owners to the claimants are as follows: Acorn Windows Mr. Silvers, carpenter Mr. Bruning for fill material Joe Williamson, brickmason & concrete =$1,875.50 =$1,183.57 =$ 551.00 =$1,100.00 Taylor Concrete =$1,629.85 Mr. Karneol, clean-up =$ 200.00 United Electric =$1,523.00 SUBTOTAL PAID BY CHECK BY THE LACKEYS =$8,060.92 Cash payments for which receipts were given: Williamson =$1,000.00 United Electric =$ 800.00 door hardware =$ 136.08 TOTAL EXPENDITURE BY THE OWNERS =$10,003.00 When the amount paid by the Lackeys to subcontractors, materialmen, and suppliers is added to the $28,973.75 paid directly to the respondent, the expenditure on the part of the Lackeys' was $38,976.75. Respondent is due credits for extras in the amount of $200 for rear concrete slab, $160 for extra brick, and $70 for an interior door. That sum of $430 when subtracted from the overall payments of the Lackeys leaves $38,546.75 expended by the Lackeys, which exceeds the agreement, or contract price, between the respondent and the Lackeys by $4,181.75. From the facts presented, it is evident that the Lackeys did not receive the performance from the respondent which they were entitled to under the terms of the contract, and as a consequence, had to pay an additional $4,181.75 above the contract price, before receiving what they had bargained for. This was at some considerable inconvenience in time as well as money. The proof is not clear on whether the respondent diverted monies or property which he had received to carry out the contract with the Lackeys into some other pursuit or whether respondent made a bargain with the Lackeys which could not be concluded with the amount of available funds which the respondent had accepted by contract as being sufficient for the Lackeys to perform their obligation under the contract.

Florida Laws (5) 120.57120.68136.08489.129591.25
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs RONALD W. STEADMAN, 97-001365 (1997)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Mar. 14, 1997 Number: 97-001365 Latest Update: Nov. 10, 1998

The Issue The issue presented is whether Respondent is guilty of the allegations contained in the Administrative Complaints filed against him, and, if so, what disciplinary action should be taken against him, if any.

Findings Of Fact At all times material hereto, Respondent was licensed as a certified general contractor in the State of Florida, having been issued license number CG C000942. At all times material hereto, Respondent was the licensed qualifying agent for Twenty First Century Construction Management, Inc. On September 5, 1992, Willie Janes, doing business as Janes Roofing Contractor, entered into a contract with Debourah Benjamin to replace the roof at her residence located in Margate, Florida. The contract price was $6,748, but Janes later agreed to do the work for $6,248, which was all Benjamin's insurance company would pay. On November 26, 1992, Benjamin gave Janes a check in the amount of $2,200 as a down payment on the work. The check was payable to Willie Janes. At the time Janes entered into his contract with Benjamin, his local roofing license had expired, and he was not licensed as a roofing contractor by the State of Florida. Respondent applied for the roofing permit for the Benjamin job. The City of Margate Building Department issued permit number 11525-R by and through Respondent's licensure on December 3, 1992. Janes commenced work on the Benjamin project on November 26, 1992. On December 8, 1992, the City of Margate Building Department performed a tin tag inspection of the work done by Janes. The work failed the inspection that day but passed two days later. On January 11, 1993, Benjamin issued a second check, in the amount of $2,300, payable to Willie Janes, for the purchase of roof tile. Janes did not order and did not pay for the roof tile until approximately June 25, 1993. The tile was delivered to Benjamin's residence a few days later and placed on the roof for installation but Janes did not return to the project site. The amount of tile delivered to Benjamin's residence was not sufficient to cover the entire roof. On approximately June 25, 1993, Benjamin noticed for the first time that the name of the company on the permit posted at her residence was Twenty First Century Construction. Neither the Respondent nor Twenty First Century Construction Management, Inc., had any involvement in Benjamin's project other than obtaining the building permit. Benjamin contacted the building department which issued the permit and was referred to Petitioner. An employee of Petitioner advised her that the qualifier for Twenty First Century Construction was Respondent. Benjamin had never heard of Respondent at the time. Benjamin contacted Respondent by telephone several times about completing the work commenced by Janes. Respondent repeatedly promised to finish the roof but never did. Benjamin next contacted the Margate Police Department to report the activities of Respondent and Janes. On September 3, 1993, Officer Liberatori of the Margate Police Department spoke to Respondent by telephone, and Respondent promised to complete the work within 30 days. However, Respondent did nothing to complete the work. The last inspection performed on the Benjamin project under permit number 11525-R was the dry-in inspection performed on February 8, 1993. Permit number 11525-R expired on July 8, 1993. In December 1993 Benjamin had the project completed by another contractor. On November 16, 1992, Delos and Barbara Johnson entered into a written contract with Respondent to remodel a porch enclosure at the Johnson residence in Coral Springs, Florida, for a contract price of $10,250. The Johnsons made three payments to Respondent: $1,000 on September 28, 1992; $5,000 on November 17, 1992; and $3,000 on December 2, 1992. On October 12, 1992, Respondent applied for a building permit from the City of Coral Springs for the Johnson remodeling. The City of Coral Springs issued permit number 920004472 by and through Respondent's licensure on November 30, 1992. When the City of Coral Springs issues a building permit, it provides with the permit a list of the required inspections. Respondent proceeded with the construction until December 2, 1992, when he received the third payment. Thereafter, Respondent ceased all construction activities on the Johnson project. Shortly thereafter, the Johnsons learned from the Coral Springs Building Department that their remodeling project had failed to pass the required inspections. When they confronted Respondent regarding his failure to obtain the required inspections, he represented to them that he had made a videotape of all the work he performed, that he himself was a building inspector and could inspect his work, and that he could get a special inspector to inspect the project from the videotape. At no time material hereto was Respondent a certified building inspector. Videotaping a construction project in lieu of obtaining required inspections is not permitted under the South Florida Building Code nor is it permitted by the City of Coral Springs Building Department. Of the required nine inspections for the project, Respondent only obtained three inspections. Of those three, he only passed two. Respondent's failure to obtain the required inspections constitutes a violation of the South Florida Building Code, the minimum standard required for any type of building construction in South Florida. A contractor's failure to adhere to that minimum standard causes harm to the public from deteriorating construction. The Johnsons and the City of Coral Springs Building Department gave Respondent an opportunity to obtain and pass the required inspections and complete the construction project. When Respondent declined to do so, the attorney hired by the Johnsons discharged Respondent. The Johnsons had paid approximately 90 percent of the money they had saved for the porch enclosure to Respondent, and they could not afford to continue with the construction project using the services of another contractor until November 1994. Rick Hugins of Hugins Construction Corp., the remedial contractor, needed to pass the required inspections that Respondent had neglected in order to be permitted by the City of Coral Springs Building Department to complete the project. Work that needed to be inspected was concealed by subsequently- installed construction materials which had to be removed in order that the required inspections could be performed. Numerous code violations were discovered in the concealed work. The work performed by Respondent was below industry standards. The Johnsons paid Hugins Construction Corp. $10,000 to correct the code violations, to pass the required inspections Respondent had missed, and to complete the project. Hugins completed the project by January 23, 1995. Respondent has been previously disciplined by Petitioner on charges of assisting unlicensed activity and of failing to notify Petitioner of his current mailing address and telephone number. That discipline included the payment of an administrative fine and an assessment of costs associated with that investigation and prosecution.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding Respondent guilty of the allegations contained in Counts I and III of the Administrative Complaint filed against him in DOAH Case No. 97- 1365, finding Respondent guilty of the allegations contained in Counts I and II of the Administrative Complaint filed against him in DOAH Case No. 97-1368, requiring Respondent to pay restitution to the Johnsons, assessing against Respondent the costs of investigation and prosecution through the time the final order is entered, and revoking Respondent's certification as a general contractor in the State of Florida. DONE AND ENTERED this 10th day of July, 1998, in Tallahassee, Leon County, Florida. LINDA M. RIGOT Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 10th day of July, 1998. COPIES FURNISHED: Dorota Trzeciecka, Esquire Department of Business and Professional Regulation 401 Northwest Second Avenue, No. N-607 Miami, Florida 33128 Edward Conrad Sawyer, Esquire 1413 North 58th Avenue Hollywood, Florida 33021 Rodney Hurst, Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (4) 120.569120.5717.001489.129 Florida Administrative Code (1) 61G4-17.002