DEPARTMENT OF COMMUNITY AFFAIRS vs JIM HOLXINGER; PAULETTE HOLZINGER; PINEWOOD ENTERPRISES, INC.; AND MONROE COUNTY, 92-007532DRI (1992)
Division of Administrative Hearings, Florida Filed:Key West, Florida Dec. 23, 1992 Number: 92-007532DRI Latest Update: Jun. 06, 1996

Findings Of Fact Stipulated Facts Jim and Paulette Holzinger own Lot 17, Section B, Long Beach Estates, located on Big Pine Key in unincorporated Monroe County, Florida. The property is south of Long Beach Drive. The property is located within the Florida Keys Area of Critical State Concern. See Sections 380.05 and 380.0552, Florida Statutes. Under these statutes, Monroe County adopted a comprehensive plan and implemented it with land development regulations which are consistent with the Principles for Guiding Development found in Section 380.0552(7), Florida Statutes. The Department of Community Affairs approved the County's comprehensive plan in Rule Chapter 9J-14, Florida Administrative Code, and the Administration Commission approved the comprehensive plan in Chapter 28-29, Florida Administrative Code. The County's comprehensive plan is implemented through its land development regulations, codified as Chapter 9.5 of the Monroe County Code. Monroe County is responsible for issuing development orders for land development in unincorporated Monroe County, including these development orders (building permits). The Local Government Comprehensive Planning and Land Development Act, Chapter 380, Florida Statutes, restricts the County from permitting development which is inconsistent with the Monroe County Comprehensive Land Use Plan, Sections 163.3161(2) and 163.3194(1), Florida Statutes. No person may undertake any development within an area of Critical State Concern except in conformity with Chapter 380; Section 380.05(16), Florida Statutes. After the County issued the three related permits, the Holzingers engaged Pinewood Enterprises, Inc., as general contractor, for the construction of their single-family residence. Those permits were rendered to the Department of Community Affairs on July 21, 1992, and the Department issued its notice of appeal of those permits on September 4, 1992. No party disputes the timeliness of the appeal. The Holzingers' lot is vegetated by mangroves, transitional plant species, and beach berm plant species. The site plan, and which was part of the Holzingers' application for the permits, which Monroe County approved, includes the approval of dredging of a portion of Lot 17 and the placement of fill on site to provide driveway access to the single-family residence. The site plan locates the single-family residence in an area of Bay Cedar thicket. The mangroves are located along the north of the lot along Long Beach Drive. Facts Found Based on Evidence Adduced at the Final Hearing The Holzingers' lot is located at the southernmost area of Big Pine Key, and is separated from the rest of the key by a wetland to the north of the property. To its south is the Atlantic Ocean. The lot is approximately 100' x 230' and contains approximately 22,750 square feet from property line to property line. On the lower keys land elevations only extend from sea level to a maximum of approximately five or six feet above sea level. The soil or substrate conditions on the lot are white calcareous deposits which appear to the untrained eye to be sand. It is not quartzite, but deposits from the breakdown of marine grasses or marine algae which have the appearance of sand. There is no caprock on the property. B (1). Habitats Recognized in the Monroe County Plan The Monroe County Comprehensive Development Plan is based upon the Data and Analysis found in volume 1 of the Plan. According to that Data and Analysis, there are different types of habitat found in the Keys. These include salt marsh, salt marsh and buttonwood association, mangrove community, tropical hardwood hammock, and beach berm complex. The most significant one here is beach berm complex; it includes: "bare, sandy shoreline with a mound or ridge of unconsolidated sand that is immediately landward of and usually parallel to the shoreline and beach. The sand is calcareous material that is the remains of marine organism such as corals, algae and mollusks. The berm may include forested costal ridges and may be colonized by hammock vegetation." Section 9.5-4(B-3), Monroe County Code [the land development regulations]. In the Data and Analysis, the County records that on Long Beach Key the most landward area of the berm is tropical hardwood hammock. The low hammocks are upland hardwood forest communities containing species such as blolly, buttonwoods, darling plums, spanish stopper and wild dilly, all of which are found on the vegitation survey of the lot done by a biologist for Mother Nature's Enterprises, Linda Pierce, as part of the Holzinger building permit application. See Section 9.5-4(L-10), Monroe County Code, which defines low hammocks. Low hammocks include berm hammock, and the beach berm association described in the County comprehensive plan includes berm hammocks (Tr. 184). B (2). The Land Use Maps and their Designations The existing conditions map which is part of the Monroe County comprehensive plan designates the area of the Holzingers' property as beach berm association. That map is drawn at the sale of one inch equals 2,000 feet. Similar aerial maps at a scale an order of magnitude smaller (one inch equals 200 feet) also show the land as beach berm with fringing mangroves. These aerial photographs have been overlaid with the Comprehensive Plan's habitat designations for use in the practical application of the land development regulations by County employees. Under the land use regulations found in the Monroe County Code, the County Commission is required to follow the existing conditions map it adopted, Section 9.5-227, Monroe County Code. Under the first paragraph of Section 9.5- 345 the environmental design criteria applicable to development of a parcel of land depend upon the habitat designated for the parcel on the existing conditions map (the map drawn at the larger scale of one inch equals 2,000 feet). Ground proofing of the habitat on the lot done by the Lower Keys' biologist, Diana Stephenson, and by the Department of Community Affairs planner/biologist, Kathleen Edgerton, show that the land is actually beach berm from the ocean to the mangroves, and there is a small area of disturbed saltmarsh landward from the mangroves to the county road which runs down the center of the key. I am not persuaded by the testimony of the biologist for the Holzingers, Mr. Smith, who believes that there is a separate tropical hardwood hammock habitat on the Holzingers' lot. A full habitat analysis would have been required if there were mixed habitats on the lot (Tr. 88, 96) and the Holzingers did not submit one to the County as part of their application. Because the County biologist found no separate low hardwood hammock habitat on the lot, she believed that no habitat evaluation index was required in processing the Holzinger application, and none was done independently by the County. Mr. Smith contended at final hearing that there are several distinct habitats on the single lot. Moving south from Long Beach Drive toward the ocean he first finds a disturbed saltmarsh of approximately 4,000 square feet; then a mangrove community of about 2,500 square feet; then a saltmarsh and buttonwood association of about 2,500 square feet; next a tropical hardwood hammock of moderate quality and finally, closest to the ocean, beach berm complex. This analysis, which designates a separate saltmarsh and buttonwood association waterward of the mangrove community, and then a separate tropical hardwood hammock waterward of the saltmarsh and buttonwood association, fails to give significant weight to the fact that low hammocks are typically found within beach berm complex. While Mr. Smith testified to the square footages for each of the five habitats, he only performed rough calculations for their size, he was not working with, nor did he perform an actual survey which would define the boundaries of the various habitats he believes are present. He readily acknowledged his preliminary habitat analysis was incomplete. Moreover, accepting for the sake of argument that there is a mixed habitat on the lot under the evidence adduced by the Holzingers, a complete habitat evaluation index should have been performed by the Holzingers as a necessary part of their application, since the County biologist did not do one in the belief there was no need for one. The essential problem with the view expressed by Mr. Smith that there are five habitats on this 100-foot lot is his contention that due to the very small changes in elevation through the Keys, one must identify different habitats recognized in the Monroe County comprehensive plan and land development regulations by assessing the predominance of different types of vegitation typical of a habitat. To Mr. Smith, if the vegitation is of a type normally found in a tropical hardwood hammock, and it predominates over the other vegitation, that area must be classified as a tropical hardwood hammock. At that level of generalization, the statement is no doubt true. Neither the land development regulations or the County's Comprehensive Plan require, or even permit, a microanalysis of the vegitation for the purpose of defining multiple habitats on a lot. Taking a broad view, such as that embodied in the existing conditions map, the predominate vegetative and soil conditions on the southern part of the island where Lot 17 is located are consistent with the categorization as beach berm association. The same is true using the aerial maps on which the different habitat designations from the land development regulations have been overlaid. What Mr. Smith has done is to look for small areas within the 100' x 230' parcel to identify areas where tropical hardwood species may be said to "predominate." The obvious purpose of Mr. Smith's division of the lot into small areas is to be able to characterize these uplands species as "predominating." This is essential to justify intensive use of the property. The comprehensive plan and the land development regulations do not permit any use of areas colonized by mangroves, which are wholly protected by a 100 percent open space requirement. This means that 100 percent of the area colonized by mangroves must be maintained in its natural condition and free and open to the sky, Section 9.5-343, Monroe County Code. Open space ratio for saltmarsh and buttonwood associations is .85 but for moderate quality low hammocks is only .60. Beach berm association is highly protected, with an open space requirement of 90 percent. Only 10 percent of the land area waterward of the mangrove habitat, therefore, can be covered with the footprint of the single-family residence and any associated driveway or other access way because it is beach berm complex. Accepting the mangrove line contained in the vegitation assessment submitted by the Holzingers in their application done by Mother Nature's Enterprises, and then using a "planimeter" to measure the area from the mangrove line to the mean high water line on the lot, there is 16,594 square feet of property. Given the 90 percent open space requirement, a very small area of 1,659 square feet may be covered with the footprint of the single-family home, including its porch, eaves, and driveway. The footprint of the house, its porch, and driveway shown on the site plan approved by the County, with the addition of a five-foot clearing zone around the footprint of the house [because it is essentially impossible to clear land only to the footprint of the completed building] reveals that the County's permits would allow the clearing of 2,880 square feet. Even without the five-foot construction zone around the house, porch and driveway, the County permits allow the clearing of 2,172 square feet. It is very difficult to understand how the Monroe County official in charge of the office which issues building permits could have determined that the development proposed by the Holzingers was permittable. That official did not testify. The County biologist for the Lower Keys who did testify, Ms. Stephenson, was adamant that the project was never permittable under the Monroe County land development regulations. The only explanation by which the permit conceivably could have been granted would be to do something the land development regulations do not permit: aggregate the square footage which the code makes available for development on the landward side of the mangroves, in the area of disturbed saltmarsh between the road and the mangroves, and add the usable square footage for that habitat area to the usable square footage on the waterward side of the mangroves, in the beach berm association. But the amount of each habitat which must remain as open space is determined for each habitat type. They cannot be aggregated across habitats, to give some total usable number of square feet, to be cleared anywhere on the property. That would ignore the significance of the separate habitat designations. The 1,659 square feet available for development in the beach berm association must be used only within that habitat, and square footage available for development within the disturbed salt marsh cannot be added to it. Fill Issues The site plan approved by the County permits fill to be used to construct a driveway on the property through the mangrove area and the beach berm area. This is simply an error on the part of the County, for no party disputes that fill is forbidden in these areas. The performance standards in the land development regulations do permit certain piers, docks, utility pilings and walkways over mangrove areas, but no fill is permitted. Section 9.5- 345(m)(1), Monroe County Code (Tr. 139). The Holzingers could receive a permit to build a raised bridge over the mangroves for access to the beach berm association portion of the lot, as has been done on a nearby lot to the west of the Holzingers' lot. They cannot, however, fill the mangroves to create the driveway shown on the site plan the County approved. The building permit the County granted which purports to allow fill in mangrove areas is inconsistent with the County's own land development regulations and cannot stand. The next question is whether there is some alternate means of access to the lot which can be used instead of that permitted. At the final hearing Mr. Smith stated that on a recent visit to the Holzingers' property, he found an old road on the east side of the property which is high land which could serve as a location for a driveway or accessway to the interior of the Holzingers' property. There is, however, actually no old road anywhere on Lot 17. There was an old road on Lot 16, and a bit of the spoil from that road may be found on Lot 17, but there simply never has been a road on the Holzingers' lot which they can use for a driveway. Fill will be required to locate any driveway, and that is inconsistent with the County land development regulations. The only thing the Holzingers can do to overcome this problem would be to build a bridge over the mangrove area and completely avoid the use of any fill. Summary of Findings The scarified or a disturbed saltmarsh area from the county road to the mangrove area is too small to be useful. The Holzingers do not plan to build in that area. Whatever portion of that area which is not required to be open space cannot be "banked" to allow additional clearing in the beach berm association on the waterward side of the mangroves. For all practical purposes, that disturbed saltmarsh area adds nothing to the buildable or clearable area on Lot 17. The mangrove area has a 100 percent open space requirement. Mangroves are a highly protective habitat, which contribute nothing to the buildable area on Lot 17. The remaining portion of the Lot 17 waterward from the mangrove area to the mean high water line is too small to permit the construction and erection of the house and driveway permitted by the development orders (building permits) issued by Monroe County. The buildable area in the beach berm association is no more than a total of 1,660 square feet for the house, its porch, the driveway. The County has issued a permit to use 2,880 square feet of that habitat (including an allowance for a construction zone), or at least 2,172 square feet, assuming the location of the house, porch, and an eight-foot wide driveway and no construction clearing around the footprint around the house/porch. This fails to meet the 90 percent open space requirement found in the Monroe County Code. The building permits issued by Monroe County to the Holzingers are therefore invalid. To obtain valid permits, the Holzingers must substantially reduce the footprint of the house, including an allowance for a construction clearing zone. A house that small may be undesirable, but it could be permitted. What the County has attempted to permit, however, is invalid under its own regulations.

Recommendation It is RECOMMENDED that development approval for the subject lot be denied, unless the applicant presents, and the County and the Department approve, a revised permit and site plan which demonstrates compliance with the mandatory open space requirements for the beach berm and mangrove habitats, and which eliminates the placement of fill in the beach berm complex and the mangrove wetlands on site. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 9th day of July 1993. WILLIAM R. DORSEY, JR. Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of July 1993. APPENDIX The Findings of Fact proposed by the Department have been generally adopted, although the long quotation from Volume I and II of the County Comprehensive Plan are not essential or necessary. See proposed finding 10. The Respondents submitted no proposed Findings of Fact. COPIES FURNISHED: Stephanie M. Callahan Assistant General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Theodore W. Herzog, Esquire 209 Duval Street Key West, Florida 33040 Linda Loomis Shelley, Secretary Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 G. Steven Pfeiffer, General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 David K. Coburn, Secretary Florida Land & Water Adjudicatory Commission Executive Office of the Governor 311 Carlton Building Tallahassee, Florida 32301

Florida Laws (7) 120.57163.3161163.3194380.031380.05380.0552380.07
# 1
WALTON COUNTY AND W. L. "BILLY" MCLEAN vs. DEPARTMENT OF NATURAL RESOURCES, 82-000132 (1982)
Division of Administrative Hearings, Florida Number: 82-000132 Latest Update: Jul. 30, 1982

Findings Of Fact Marvel O. Warren and his brother Dan own a parcel of beachfront property in Walton County, south of State Road 30A (SR30A) near Seagrove Beach. Like Mr. Warren, the other intervenors own beachfront in the area, which lies in County Commission District Five. In 1954, before the Warrens built their house landward of the dunes, no road ran toward the beach from SR30A. Construction traffic to the house site beat down a path, however. In Walton County, each county commissioner is responsible, within the district he represents, for road maintenance and, on existing county right-of- way, for construction of new roads. DNR's Exhibit No., 7; Testimony of Owens. Expenditures in excess of $500 for materials beyond what the county has stockpiled require approval by the full commission, however. Testimony of Owens. FIRST ROAD BUILT Albert Gavin of Freeport was county commissioner for District Five when, in 1958 or 1959, he caused a red clay road to be built from SR30A southerly along the eastern edge of the Warren property over sand dunes and onto the beach to within 20 or 30 feet of the water's edge. During Mr. Gavin's tenure, the county owned a borrow pit and kept no records of how much clay was placed where. (No records of the quantity of clay deposited on the beach at any time were offered in evidence at the hearing.) Fishermen used the road to launch boats into the Gulf of Mexico. Except for any portion that may have extended onto sovereignty land, the road lay on county-owned right-of-way. UPLAND SEGMENT PERMANENT The clay road landward of the sand dunes leading along the eastern edge of the Warren property to SR30A (the upland road) has been consistently maintained and in existence since it was originally built. The upland road ends at the bluff line, which is practically congruent with the coastal construction control line at that point on the coast. DNR's Exhibit No. 4; Testimony of Hill. At some time between 1960 and 1969, also landward of the subsequently established coastal construction control line, a clay parking lot was built adjacent to the upland road. BEACH SEGMENTS EVANESCENT Whenever clay has been placed on the beach, seaward of the crest of the landwardmost sand dune, the gulf has washed it away. Many clay roads at the site did not last the summer. Virtually no clay deposit has lasted longer than a full year. One attempt after another to construct a clay road seaward of the sand dunes (the beach segment) has failed. Witnesses testified that the sun bleached the red clay and that wind covered it with white sand but wave action has been the clay's principal nemesis. When Harold C. Lucas was commissioner for District Five from March, 1968, to January, 1969, no clay was deposited on the beach and there was no beach segment. Except for three months in 1975 when Van Ness R. Butler, Jr., of Grayton Beach, served as District Five's county commissioner, Conley Martin of Portland represented the district from 1969 to 1976. As county commissioners, both of these men directed clay to be placed on the beach at various times. COASTAL CONSTRUCTION CONTROL LINE ESTABLISHED A beach segment was in existence at the time the coastal construction control line was established, and recorded, on June 4, 1975, although the beach segment that then existed went straight from the foot of the sand dune toward the edge of the gulf, instead of veering east like the new; longer beach segment built last September. THEN EXISTING ROAD DESTROYED, REPLACED In September of 1975, Hurricane Eloise removed not only the beach segment of the road but much of the beach, including the dunes themselves. As road foreman for District Five at the time, Robert N. Budreau used a road grader and other equipment to fill a large hole between the Warren house and the sand dune and to cover over broken toilets and other debris with a mixture of sand and yellow clay. After the filling, a roadway was constructed with the same sand and clay mix, extending about 25 feet seaward of the dunes along a line perpendicular to the gulf shore. REPLACEMENT ROAD RECLAIMED BY ELEMENTS In 1976, Freddie M. Bishop was elected county commissioner for District Five. After the beach segment built by Mr. Budreau washed out, at least one constituent, Gene Wesley, asked Mr. Bishop to replace it, but Mr. Bishop broke with sisyphean tradition, and declined to place any clay on the beach, or otherwise attempt to reconstruct or replace the beach segment. By the time petitioner McLean succeeded Bishop as commissioner for District Five, the beach segment had been completely obliterated. The end of the upland road continued, however, to be one of some half-dozen points of access for four-wheel drive vehicles to Walton County's gulf beaches. Commissioner Bishop did cause two truckloads of oyster shells to be deposited on the "hump" of the landward sea dune, on or near the bluff line. NEW BEACH SEGMENT In response to constituents' requests, Mr. McLean ordered a new road built. He caused clay and gravel to be placed and compacted seaward of the coastal construction control line by county workmen and machinery, including some "borrowed" for the purpose from colleagues on the Walton County Commission. Built without a DNR permit in September of 1981, this new beach segment extends 180 feet seaward of the coastal construction control line and takes an unprecedented veer to the east. The only preexisting foundation for the new beach segment was the beach itself. Like Commissioner Anderson, Commissioner W. F. Miles "lent" county trucks he had charge of to respondent McLean, but Mr. Miles did not know in advance that Mr. McLean intended to use them to build a road on the beach. Commissioners Matthews, Miles, and Owens were aware of the existence of the coastal construction control line in Walton County and, in a general way, of DNR permitting requirements and procedures, including the fact that the County Commission itself acts on certain coastal construction applications. Commissioners Anderson and McLean did not testify on these matters. DNR has issued no permit for anything like the new beach segment at any time since the coastal construction control line wad established. DNR has no record of any inquiry concerning the new beach segment by or on behalf of petitioners McLean or Walton County, before the new beach segment was built. There was no showing that Mr. McLean sought legal advice before ordering construction of the new beach segment. Paragraphs 1 through 8 of DNR's "Final Order," as amended at the final hearing and set forth above, have been established by stipulation of the parties. The hearing officer has had the benefit of posthearing submissions, including proposed findings of fact, filed by all parties. Proposed findings have been adopted, in substance, where relevant, except when unsupported by appropriate evidence.

Recommendation Upon consideration of the following, it is RECOMMENDED: That DNR order petitioner Walton County to remove the new beach segment seaward of the Walton County Coastal Construction Control Line within 30 days of entry of a final order. That DNR remove the new beach segment seaward of the Walton County Coastal Construction Control Line itself, in the event of petitioner Walton County's noncompliance with the final order; and take steps to recover the cost from petitioner Walton County. That DNR impose no civil or administrative fine against petitioner W. L. "Billy" McLean. DONE AND ENTERED this 30th day of July, 1982, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 1982. COPIES FURNISHED: George Ralph Miller, Esquire Post Office Box 687 DeFuniak Springs, Florida 32433 W. Dennis Brannon, Esquire Post Office Box 1503 Fort Walton Beach, Florida 32549 Deborah A. Getzoff, Esquire Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303 M. Stephen Turner, Esquire Post Office Drawer 591 Tallahassee, Florida 32303 Elton J. Gissendanner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (3) 120.57161.053161.054
# 2
SARASOTA COUNTY vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-003533 (1990)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Jun. 06, 1990 Number: 90-003533 Latest Update: Feb. 19, 1991

Findings Of Fact Sarasota County and MPS both filed extensive exceptions to the Recommended Order. I have grouped these exceptions according to the following issues: Manatee Protection, Turtle Nesting impacts, Fisheries impacts, Seagrass impacts, Wetlands Impacted, Water Quality Improvement, Public interest Balancing Test, Miscellaneous Exceptions, Requests For Additional Findings of Fact, and Conclusions of Law. I shall discuss and rule on each exception by the above groupings. 1. Manatee Protection Sarasota County Exception Number 1 and MPS Exception Numbers 6 and 8 are directed to the issue of adverse affects on the West Indian Manatee. Sarasota County and MPS take exception to Finding of Fact ("FOF") No. 24, claiming that there is no competent substantial evidence in the record to support the finding that it is anticipated that increased motorboat traffic in the pass vicinity would be an increased potential danger to manatees. MPS additionally takes exception to the finding in FOF No. 29 that maintenance dredging will entail a danger to manatees similar to that during the construction phase. At the outset, I note that where a Hearing Officer's finding of fact is supported in the record by any competent, substantial evidence I am not permitted to reweigh the evidence and reject the finding of fact. See, e.g., Florida Debt. of Corrections v. Bradley, 510 So.2d 1122 (Fla. 1st DCA 1987); Section 120.57(1)(b)1O., Florida Statutes. In this case the record does contain competent substantial evidence supporting FOF Nos. 24 and 29. The Hearing Officer's finding that increased motorboat traffic is an expected result of opening of the pass is not disputed. FOF No. 34. The area is designated as a critical habitat for the West Indian Manatee. FOF No. 22. The prefiled testimony of Ms. Kimberly A. Dryden states that "[a]n increase in boat/manate collisions associated with increased boat presence in the pass may occur." Dryden, PF-11. Ms. Dryden was admitted as an expert in wildlife biology including expertise in manatees, and her prefiled testimony was accepted into evidence. TR-756-760. Finally, the fact that Sarasota County itself proposed a manatee protection plan involving, among other things, that all project vessels operate at "no wake" speeds, supports the finding that increased motorboat traffic in the pass vicinity would be an increased potential danger to manatees. Sarasota County and MPS point to the public notice of the U.S Army Corps of Engineers (Hearing Exhibit 26) and a U.S. Fish and Wildlife Service letter (Hearing Exhibit 27) as overwhelming evidence that no adverse effect on the manatee is expected. In essence, Sarasota County and MPS are asking me to reweigh the competent, substantial evidence. As noted above, I may not lawfully do that. The parties do not dispute the Hearing Officer's finding that maintenance dredging is expected to be needed as long as the inlet remains open. FOF No. 21. For the reasons set forth above, the Hearing Officer's finding that maintenance dredging will present a danger to manatees similar to the construction is supported in the record by competent substantial evidence. Sarasota County and MPS also assert that FOF No. 24 must be rejected because it is contrary to a stipulation of fact by the parties. Indeed, the record shows that a prehearing stipulation was filed and accepted into the record without objection at the hearing. TR-8. Stipulation of Fact No. 24 states: With the implementation of recommendations of the U.S. Fish and Wildlife Service, it is not expected that the project will have a significant adverse impact on the manatee or its habitat. Steven Sauers, Director of the Coastal Zone Division for Sarasota County, testified that he believed the County "could adhere to these [U.S. Fish & Wildlife Service] recommendations under a condition of authorization." TR-94-98. I note that when the prefiled testimony of Ms. Dryden was accepted into evidence at the hearing, neither Sarasota County nor MPS objected to those portions dealing with manatee impacts as being contrary to Stipulation of Fact No. 24. I must therefore consider whether the failure to object constitutes a waiver of the stipulation, and whether the Hearing Officer, as the ultimate finder of the facts, is bound by a stipulation of fact when the record contains competent, substantial evidence which conflicts with the stipulation. It has long been the eablished rule of law that stipulations of fact properly entered into are binding on both the parties and the court. See, e.g., Troup v. Bird, 53 So.2d 717, 721 (Fla. 1951) (where case is tried on stipulation, no further or different facts will be presumed to exist). Where a party seeks to be relieved from a stipulation, he or she generally must file a timely motion, with notice to opposing parties, showing good cause and no prejudice to opposing parties. U.S. Fire insurance Co. v. Roberts, 541 So.2d 1297 (Fla. 1st DCA 1989); Lopez v. Dublin Co., 489 So.2d 805, 807 n.3 (Fla. 3d DCA 1986); Munilla v. Perez-Cobo, 335 So.2d 584 (Fla. 3d DCA 1976), cert. den., 344 So.2d 325 (Fla. 1977); Villa v. Mumac Construction Corp., 334 So.2d 274 (Fla. 3d DCA 1976); Curr v. Helene TransportatIon, 287 So.2d 695 (Fla. 3d DCA 1974). Good cause requires showing of fraud, overreaching, misrepresentation, withholding of facts by the adversary party, or such other element as would render the agreement void. Spitzer v. Bartlett Brothers Roof in, 437 So.2d 758 (Fla. 1st DCA 1983); Citv of Vero Beach v. Thomas, 388 So.2d 1374 (Fla. 1st DCA 1980). In this case, neither the Department nor the Respondent Intervenors sought to be relieved from the stipulation, and there is no contention that any basis for good cause exits to be relieved from the stipulation. However, it is also a long established rule of law that failure to contemporaneously object to the admission of contested evidence is a waiver of the right to object. See, e.g., Swan v. Florida Farm Bureau Ins. Co., 404 So.2d 802 (Fla. 5th DCA 1981); DeLuca v. State, 384 So.2d 212 (Fla. 4th DCA 1980), rev. den., 389 So.2d 1108 (Fla. 1980); Ehrhardt, Florida Evidence, Section 104.1 (2d Ed 1984); Section 90.104, Florida Statutes. in this case the testimony which conflicts with the stipulation was pre-filed before the hearing and the opposing parties had ample opportunity to review it before the hearing. Yet, although Sarasota County did raise objections to certain portions of Ms. Dryden's pre- filed testimony, no objection was raised to the portion relevant to impacts on manatees. TR-754-760. There is also authority for the proposition that when evidence contrary to a stipulation is introduced at trial without objection, the finder of fact is not bound by the stipulation. Special Disability Trust Fund v. Myers, 492 So.2d 788 (Fla. 1st DCA 1986), cause dism'd, 491 So.2d 280 (Fla. 1986); Espada Enterprises Inc. v. Spiro, 481 So.2d 1265 (Fla. 1st DCA 1986); Woods v. Greater Naples Care Center, 406 So.2d 1172, 1173 (Fla. 1st DCA 1981), rev. den., 413 So.2d 876 (Fla. 1982). In consideration of the above authorities and circumstances, I conclude that the Hearing Officer was not bound by the stipulation and could properly consider the relevant portion of Ms. Dryden's pre-filed testimony. Therefore the record contains competent, substantial evidence in support of the above findings of fact. Accordingly, the above noted exceptions of Sarasota County and MPS are denied. Turtle Nesting Impacts Sarasota County Exception No. 2 and MPS Exception No. 7 dispute FOF No. 26, which states that: "Once dredged, the beach area in the pass vicinity would be permanently lost for the purpose of turtle nesting." Sarasota County and MPS argue that although a portion of the beach will be removed to create the inlet, the loss of beach will not significantly impact on turtle nesting. Sarasota County and MPS contend that the "overwhelming weight" of the evidence is contrary to FOF No. 26. They are in essence asking me to reweigh the evidence. For the reasons stated above, I cannot do so. If the finding of fact is supported in the record by any competent, substantial evidence, then I am not at liberty to reject it. Florida Department of Corrections, supra; Section 120.57(1) (b)10., Florida Statutes. Ms. Belinda Perry, Projects Coordinator in the Coastal Zone Division of Natural Resources of the Sarasota County Natural Resources Department, testified that she had maintained records of sea turtle nests in the vicinity of Midnight Pass. She testified that on the average over the last eight years there have been four nests per year in the area that the new inlet at Midnight Pass will be located. Perry, TR-537-538; Perry PF-2, 5, 8. This is competent, substantial evidence of an adverse impact on the nesting habitat of sea turtles. Sarasota County and MPS argue that this impact is not "Significant." If I were to consider the "significance" of the loss of 4 nests per year for the purpose of accepting or rejecting FOF No. - 26, I would in effect be weighing that evidence. This I may not do. If the finding of fact is supported in the record by any competent, substantial evidence I may not reject it. Although not articulated, Sarasota County and MPS may be arguing that when evidence which supports a finding of an adverse impact on an endangered or threatened species is "not significant," then such evidence or finding of fact cannot be considered when weighing the seven factors set forth in the public interest balancing test of Section 403.918(2) (a), Florida Statutes. I reject any such argument as contrary to the law. Neither the statute nor any authority requires a minimum threshold weight for any of the factors. The statute merely requires the Department to "consider and balance" the seven criteria. For the foregoing reasons, Sarasota County's Exception No. 2 and MPS's Exception No. 7 are rejected. Fisheries Impacts Sarasota County Exception No. 4 and MPS Exception No. 10 challenge that part of FOF No.-3- that states "the flushing and arrival of predator fishes will adversely affect the nursery habitat now enjoyed by the fish community currently within the LSB." (emphasis added) Sarasota County and MPS contend that this finding is unsupported by any competent substantial evidence in the record. I disagree. Robert L. Stetler, Environmental Administrator, Wetlands Resource Management for the Department's Southwest District testified as follows: Q. What impact on fisheries does the present, i.e., closed condition of the Midnight Pass area have? A. Current conditions in the backwater area of Midnicht Pass as mentioned Before, as quiescent in nature. This influences the fisheries utilization to the competitive advantage of the smaller species and of the early life stages of many of the larger pelagic fish species. The additional cover afforded by seagrass communities and the very shallow water nature of large portions of the site tend to limit successful predation on the smaller specimens. The periphyton communities associated with shallow water areas and seagrass beds also provide large quantities of food to the smaller or younger fish. The conditions now found at Midnight Pass enable it to be classified as a nursery area because they perform the functions of feeding and protecting the early life stages of numerous fish species. Nursery areas like the pass region have been identified as essential to the maintenance of healthy, well balanced fish populations. Q. Does a quiescent estuarine zone provide any particilar benefit to commercially important fish species? A. Under the estuarine conditions, water quality also contributes to the success and/or failure of certain fish species. Many of the estuarine dependent fish species have life histories that include spawning in or near the marine environment and the mitigation [sic] of the larval forms into areas of lower salinity, sometimes lower dissolved oxygen and, in the summer months, often very high water temperatures. These harsh conditions are tolerable to a early life stages of several commercially important fish species and further protects them from predation by adult piscivorous (fish eating) fish that cannot tolerate these conditions. Some of the important commercial species exhibiting this life cycle are the Tarpon, Spotted Seatrout, Redfish, Mangrove snapper, Sheepshead and Mullet. Q. What, in your opinion, would be the overall impact to fisheries resources from the opening of Midnight Pass? A. The overall impact of the project to fisheries would be significant. Reactivating an inlet would produce conditions conducive and reintroducing larger, motile, pelagic fishes into the area. increased flushing would likely occur resulting in increased salinities, higher energy conditions from waye and tidal action. The recreational fishery would probably produce more larger fish utilizing the pass as a migratory, spawning and feeding site. However, the direct impact of the project would also result in the loss of significant portions of the nursery habitat previously described. Q. in your opinion, would opening Midnight Pass be in the public interest from a fisheries standpoint? A. No. Q. Why not? A. The expected physical damages associated with reopening the pass -- increased water depths, destabilization of the substrate by tide and wave energy and destruction of existing shallow water habitat will eliminate or significantly change the habitat characteristics and water guality conditions essential to the early life stages of many fish species. Loss of nursery habitat has been a long-term trend to Tampa and Sarasota Bay due to past dredge and fill activities and increased development. This long-term loss results in a need to classify remaining nursery areas, like Midnight Pass, as critical habitat warranting special protection. (emphasis added) Stetler PF-11-13. This prefiled testimony was accepted into evidence. TR-836, 839. When read in its entirely it clearly provides competent, substantial evidence to support the above finding of fact. Mr. Stetler testified that the existing nature of LSB provides a nursery for certain fishes that in the early stages of their life take advantage of areas of lower salinity, sometimes lower dissolved oxygen and, in the summer months, often very high water temperatures. Such harsh conditions protect them from predation by adult fish that cannot tolerate such conditions. He further testified that reopening Midnight Pass would result in increased flushing, increased salinity, and the loss of significant portions of the above characteristics with a consequent loss of significant portions of the nursery habitat. This testimony is competent, substantial evidence supporting FOF No. 32. Therefore, i may not disturb this finding of fact. Accordingly, the above noted exceptions are rejected. Seagrass Impacts Loss of Seagrass Sarasota County Exception No. 5 and MPS Exceptions Nos. 10 and 11 take exception to the Hearing Officer's finding that the submerged areas of LSB in the vicinity of the inlet are vegetated with seagrasses (including shoalgrass, turtle grass, manatee grass, and halophila), and that a significant portion of these grasses will be dredged if the proposed project is implemented. FOF No. 33. The Hearing Officer also found that the dredged seagrass areas will no longer serve as a nursery to young fishes. FOF No. 34. Sarasota County and MPS contend that only 10 acres of seagrasses will be dredged, and that the evidence shows that reopening Midnight Pass will cause more dense growth of seagrasses in those areas not dredged. Sarasota County and MPS also contend that the Hearing Officer erred in concluding that all four of the above noted types of seagrasses would be lost. The gist of Sarasota County's and MPS's argument is that the loss of ten acres of seagrss is less than 10% of the total seagrass acreage in the project area, and therefore is not significant. Sarasota County and MPS further argue that even if the loss of 10 acres of seagrass was significant, it would only be a temporary loss because the opening of Midnight Pass would result in greater seagrass growth, density, and diversity in those areas not dredged. Neither Sarasota County nor MPS take exception to the finding that l0 acres of seagrasses will be dredged, and that, due to the depth of the channel to be dredged, seagrasses would not be expected to reseed or colonize in the deep channel cuts. FOF No. 34; Prehearing Stipulation of Fact No. 22. The record contains competent, substantial evidence that in the vicinity of the project there are 108 acres of seagrasses. Lewis, PF-6 (accepted into evidence TR-425-436). A loss of ten acres of seagrasses would be a loss of more than 9% of the total acreage in the vicinity of the project. A loss of seagrass can have an adverse impact on a fish nursery. Leiby TR-507, 509-510. I reject any suggestion that such a loss is not significant. MPS and Sarasota County contend that there will be no net loss of seagrass because the loss of the ten acres will be offset by increased growth, density, and diversity of seagrasses in the areas not dredged. in asking me to reject the above noted findings, Sarata County and MPS are in effect asking me to weigh the evidence of the impact of the loss of ten acres against the evidence that increased growth, density, and diversity of the seagrasses elsewhere will soon offset any reduction in nursery value to young fishes. When I rule on exceptions to findings of fact I cannot reweigh the evidence. If the record contains any competent, substantial evidence to support the finding, I must accept it. Finally, as to issue of the types of seagrasses present, the record contains competent, substantial evidence that all four of the species mentioned in the finding of fact are found in the project area to be dredged. Stetler PF- 6, TR-843-845; Wilber PF-33, TR-908-915; Dryden PF-5-7; Prehearing Stipulation of Fact No. 21. For all of the reasons set forth above, i reject the exceptions of Sarasota County and MPS. Propeller Dredging of Seagrass Sarasota County Exception No. 6 and MPS Exception No. 12 take exception to the Hearing Officer's finding that "increase motorboat traffic which is an expected result of the pass reopening, would also limit grasses from re- establishing in shallower areas due to damage caused by propellers." FOF No. 34. Sarasota County and MPS do not dispute that opening - Midnight Pass will increase motoboat traffic in LSB. Dr. Wilber testified that the "foreseeable increased boat utilization, especially by large boats will increase seagrass bed damage through prop dredging . . . ." Wilber PF-31. There being competent, substantial evidence in the record supporting the above finding, the exceptions of Sarasota County and MPS are denied. Wading Bird Habitat Impacts Sarasota County Exception No. 5 takes exception to the Hearing Officer's finding that "the grassy flats will no longer be available to the numerous species of wading birds which frequent the areas since the closure of the pass." FOF No. 33. Ms. Dryden testified that wading birds now use the shallow tidal flats and mud flats which are proposed to be removed. Dryden PF-4-8, 10-11. Mr. G. Jeffery Churchill testified that, as a result of the project, approximately 9 acres of wading bird feeding habitat would be lost. Churchill PF-16-17, TR- 485-487. The record contains competent, substantial evidence supporting the above finding. Therefore, Sarasota County's exception is denied. Wetlands Impacted Sarasota County Exception No. 6 and MPS Exceptions Nos. 5 and 12 take exception to the finding that the dredging proposed by the County would eliminate at least 50 acres of wetlands. FOF Nos. 17 and 34. Sarasota County and MPS contend that only 1.1 - 1.3 acres of vegetated wetlands will be lost. This contention appears to be based on the assertion that submerged lands are not "wetlands" within the meaning of Sections 403.91 - .929, Florida Statutes. I reject Sarasota County's and MPS's narrow construction of the meaning of jurisdictional wetlands. Section 403.912(1) sets forth the powers and duties of the Department in permitting activities in wetlands, including activities "in waters to their landward extent . . ." (emphasis added). The term "waters" includes "rivers, lakes, streams, springs, impoundments and all other waters or bodies of water, including fresh, brackish, saline, tidal, surface, or underground waters." Section 403.031(12), Florida Statutes. the term "wetlands" therefore is inclusive of surface bodies of waters up to and including the limit of the Department's jurisdiction as established by Section 403.817, Florida Statutes and Rule 17-301, F.A.C. Dr. Wilber testified that the project would dredge 43.8 acres for the two access channels, 3.6 acres for the sediment basin, and 7.5 acres of jurisdictional wetlands for the inlet channel. Wilber PF-5-6. Dr. Wilber further testified that habitat within the proposed channels consisted of valuable biological communities of a natural character that would be severely disrupted or eliminated if the project were permitted. Wilber PF-9. The record contains competent, substantial evidence to support the above finding. The exceptions of Sarasota County and MPS are rejected. Water Quality Improvement Sarasota County Exception No. 7 and MPS Exception No. 14 take exception to the Hearing Officer's finding that "the water quality within LSB will not be significantly improved as a result of the reopening of the inlet. "FOF No. 38. it is contended that this finding is immaterial and irrelevant. These exceptions also challenge as irrelevant the Hearing Officer's finding that "it is impossible to conclude that marine environments serve a more useful purpose than estuarine systems." FOF No. 38. I agree that it is not required that the proposed project improve the water quality in LSB in order to be permittable. Permitting of a dredge and fill project in an Outstanding Florida Water requires that the applicant show that the project is clearly in the public interest, and that reasonable assurance has been provided that the project will not cause or contribute to violations of water quality standards, including a showing that the existing ambient water quality within the OFW will not be lowered as a result of the proposed activity. Section 403.918(1),(2), Florida Statutes; Rules 17-4.242(2) (a), 17-302.300, F.A.C. The applicant must also show that secondary impacts of the project, and cumulative impacts of reasonably foreseeable similar projects in the same geographical location will not result in violations of water quality standards, and will not result in the project being not clearly in the public interest. Conservancy, Inc. v. A. Vernon Allen Builder, Inc., No. 90-520 (Fla. 1st DCA, March 29, 1991); Caloosa Property Owners' Ass'n v. Department of Environmental Regulation, 462 So.2d 523 (Fla. 1st DCA 1985); Section 403.919, Florida Statutes. The analysis of secondary and cumulative impacts is not a third test; rather, it is a factor to be considered in determining whether reasonable assurance has been provided that the project will not result in violations of water quality standards, and that the project meets the applicable public interest test. Conservancy, Inc., supra; Peebles v. Department of Environmental Regulation, 12 FALR 1961 (DER, April 11, 1990); Concerned Citizens League of America v. Department of Environmental Regulation, 11 FALR 4237, 4246 (DER, March 29, 1989). if the applicant is unable to satisfy the applicable public interest test, the applicant may propose or accept measures to mitigate the adverse effects caused by the project. Section 403.918(2)(b), Florida Statutes. 4/ On the other hand, throughout these proceedings Sarasota County has attemptd to justify the project and show that it is clearly in the public interest by asserting the project will improve water quality in LSB. For example, at page 7 of Sarasota County's Proposed Recommended Order it states: Sarasota County has convincingly demonstrated that it meets the statutory criteria for approval of this project in this Outstanding Florida Water. The project will not degrade ambient water quality, and it will cause an improvement in water guality, not only in the immediate vicinity of the Pass but throughout Little Sarasota Bay. This improved water guality will in turn reap substantial benefits to the degraded marine habitat, the flora and fauna, commercial and recreational fishing and the public's general enjoyment and ability to use Little Sarasota Bay. (emphasis added) Similarly, Sarasota County stated in its opening argument at the hearing that: TR-14. We think that there has been a decline in water quality and it will continue to decline and it will continue to get worse. By reopening the pass, we think we can stop that decline. We think that there will be such considerable improvements to the bay to be clearly in the public interest. The Hearing Officer's finding is clearly relevant to Sarasota County's assertion that the claimed improvement in water quality will make or help make the project to be clearly in the public interest. Similarly, since the reopening of the pass will cause the reversion of LSB from an estuarine to a marine ecosystem, the Hearing Officer's finding on the failure to show that a marine ecosystem has a more useful environmental purpose is also, at least arguably, relevant to the public interest test. 5/ The record contains competent, substantial evidence which supports this finding. Nearhoof PF-8-12, TR-891-895; Wilber PF-17-18, TR-920-921. There being competent, substantial evidence to support the finding, I shall not reject it. The exceptions are there denied. Public Interest Balancing Test Sarasota County Exceptions Nos. 8 and 12, and MPS Exceptions Nos. 15 and 17, take exception to the Hearing Officer's finding that "the beneficial changes expected to result from the reopening of the pass do not offset the adverse affects reasonably expected to be caused by the dredging." FOF No. 39. Exception is also taken to FOF No. 43, which states that it was not established that the project is clearly in the public interest. The gist of these exceptions is that the balancing test is a conclusion of law rather than a finding of fact. Even if that were so, the error in mislabeling would be harmless. Even though I agree that the ultimate determination of the public interest balancing test is a conclusion of law, I do not agree that predicate findings of ultimate facts are not appropriate. Florida Audubon Society v. Cullen, ER FALR 91:018 (DER, Sept. 27, 1990). The Hearing Officer's FOF Nos. 34 and 43 are predicate findings of ultimate facts sufficiently supported in other findings of fact for each of the seven criteria in the public interest balancing test of Section 403.918(2)(a), Florida Statutes. See for example: Department's Response To Request For Admission No. 17, and R.O. at 21 and 23, accepting MPS's proposed finding of fact- No. 74, and Sarasota County's proposed finding of fact No. 50 (project will not adversely affect public health, safety or welfare); (b) FOF Nos. 17, 22, 24-26, 29, and 32-35 (regarding conservation of fish and wildlife, etc.); FOF No. 36 and R.O. at 23, accepting MPS's proposed finding of fact Nos. 134 and 135 (regarding navigation, flow of water, erosion or shoaling); FOF Nos. 32 and 33 (regarding fishing recreational values or marine productivity); FOF No. 21, 29 and 37 (regarding temporary or permanent nature of project); FOF No. 28 (regarding historical and archaeological rsources); and FOF Nos. 30 and 38 (regarding current condition and relative value of functions being performed by areas affected by project). The exceptions are therefore rejected. Miscellaneous Exceptions Sarasota County Exception No. 9 Sarasota County Exception No. 9 contends that there is no competent, substantial evidence for the finding that the Department has not permitted the destruction of a habitat of this size without requiring extensive mitigation. FOF No. 40. Mr. Randall L. Armstrong, then Director of the Division of Water Management of the Florida Department of Environmental Regulation, testified that he had worked at the Department since 1972, and that "[i]n my experience with the Department in issuing permits under those statutes (Sections 403.918-.919] the Department has never permitted the destruction of such a large area of viable habitat without requiring extensive mitigation." Armstrong PF-9, TR-1017. Sarasota County's reliance on the testimony of Mr. Lewis about lack of mitigation in a Key Biscayne project is misplaced since that project occurred before the enactment of the Henderson Wetlands Act in 1984. Lewis TR at 482. in any event, FOF No. 40 is supported in the record by competent, substantial evidence. The exception is denied. Sarasota County Exception No. 11 and MPS Exception No. 16 Sarasota County Exception No. 11 and MPS Exception No. 16 complain about FOF No. 42, yet do not dispute its correctness. The finding is a irrefutable finding that no mitigation is proposed for 10 acres of seagrasses which will be dredged. The exceptions are merely an assertion that mitigation is not necessary for the loss of seagrasses because additional seagrass will grow elsewhere. This contention was addressed above under the heading of Seagrass impacts. Furthermore, the Department has the ultimate authority to determine whether mitigation is required and, if so, whether the proposed mitigation is adequate. 1800 Atlantic Developers v. Department of Environmental Regulation, 522 So.2d. 946 (Fla. 1st DCA 1989). The exceptions are rejected. Sarasota County Exception No. 3 Sarasota County's Exception No. 3 claims to take exception to FOF No. 29 but does not dispute any of the facts stated therein. The exception is rejected. MPS Exception No. 1 This exception quibbles over an immaterial issue of semantics in FOF No. 2, i.e., whether the project is to "dredge an inlet" or to "restore" the past inlet. The exception is rejected. MPS Exception No.2 MPS takes exception to FOF No. 4 which states that LSB was designated an Outstanding Florida Water. The gist of MPS's exception is that the Environmental Regulation Commission excluded Midnight Pass when LSB was designated as an OFW. Since "Midnight Pass" no longer existed as a body of water when LSB was designated an OFW on April 29, 1986, the exception is rejected as immaterial and irrelevant. MPS Exceptions No. 3 and 13 MPS takes exception to the Hearing Officer's finding in FOF No. 7 that prior to the closing of Midnight Pass the "beach along the northern stretch of Casey Key eroded badly." MPS also excepts to the finding that without beach renourishment the restoration will cause "harmful erosion" along Casey Key. FOF No. 37. MPS does not dispute the erosion; rather, MPS complains about the choice of words describing the degree of erosion. The choice of words is not material to the underlying validity of the finding. The exceptions are without merit and are rejected as immaterial. MPS Exception No. 9 MPS takes exception to FOF No. 30, contending that there is no support in the record for a finding that, as a result of the evolution of LSB from a marine to an estuarine system, LSB has a longer freshwater residence time. MPS is misreading FOF No. 30. It is clear that FOF No. 30, when properly read, states that as a result of the closure of the pass LSB has evolved from a marine to an estuarine system, and that this evolution is a consequence of the longer freshwater residence time which was caused by the closing of the inlet. This is supported in the record by competent, substantial evidence. Echernacht TR-707. MPS also takes exception to the finding that levels of dissolved oxygen and salinity within LSB are fairly typical for a healthy estuarine system. FOF No. 30. The record contains competent, substantial evidence to support this finding. Wilber PF-32. The exceptions are rejected. Requests For Additional Findings of Fact Sarasota -County Exceptions Nos. 3, 10, and 13 through 16, and MPS Exceptions Nos. 4 and 18 are in essence asking me to make additional findings of fact, or to accept proposed findings of fact which were rejected by the Hearing Officer. I may not lawfully make an independent determination of a disputed fact. Cohn v. Department of Professional Regulation, 477 So.2d 1039, 1047 (Fla. 3rd DCA 1985). Accord, Miller v. State, Department of Environmental Regulation, 504 So.2d 1325, 1327 (Fla. 1st DCA 1987). See also Manasota 88, Inc. v. Tremor, 545 So.2d 439 (Fla. 2d DCA 1989); Inverness Convalescent Center v. Department of Health and Rehabilitative Services, 512 So.2d 1011 (Fla. 1st DCA 1987); Friends of Children v. Department of Health and Rehabilitative Services, 504 So.2d 1345 (Fla. 1st DCA 1987). As to Sarasota County Exception No. 14, which requests a finding of fact that the project will not adversely affect the pubic health, safety and welfare, I note that the Hearing Officer accepted this finding of fact which was proposed in both paragraph 74 of MPS's proposed recommended order and in paragraph 50 of Sarasota .County's proposed recommended order. See R.O. at 21 and 23. Therefore, I consider the requested finding of fact to have already been made by the Hearing Officer. No additional finding is required of me. Sarasota County Exception No. 15 asks me to make specific additional findings of fact in relation to effects of the project on marine productivity. Sarasota County orrectly points out that a finding regarding whether the project will adversely affect marine productivity is needed to conduct the public interest balancing test of Section 403.918(2), Florida Statutes. However, I note that the Hearing Officer's FOF Nos. 32 and 33 are sufficient predicate findings for her to consider and weigh this criteria in the balancing test. Furthermore, the Hearing Officer has considered and ruled on Sarasota County's proposed findings related to marine productivity as set forth in Sarasota County's proposed recommended order paras. 105-108 and 110 (accepted) and para. 111 (rejected as vague). See R.O. at 22. Sarasota County Exception No. 15 is essentially a reiteration of proposed findings of fact which had been asserted before the Hearing Officer. Where the Hearing Officer clearly and specifically addressed and ruled on the proposed finding in the recommended order, I am not required to provide further reasons for my ruling. Britt v. Dept. of Professional Regulation, 492 So.2d 697 (Fla. 1st DCA 1986), overruled on other grounds sub nom., Dept. of Professional Regulation v. Bernal, 531 So.2d 967 (Fla. 1988). I concur with and adopt the Hearing Officer's rulings as being based on competent, substantial evidence, and therefore reject the exception. Sarasota County Exception No. 16 asks me to make specific findings with regard to cumulative impacts. The matter ofwhether the proposed project will have any significant adverse secondary or cumulative impacts was a disputed issue at the hearing. See Prehearing Stipulation at 24, Stipulated Disputed issue VI(A)9. Section 403. 919, Florida Statutes, requires consideration of the cumulative impacts of the project in conjunction with other existing or future projects where there is a "reasonable likelihood" of similar project applications in the same geographic location in the future. Caloosa Property Owners Ass'n v. Department of Environmental Regulation, 462 So.2d 523 (Fla. 1st DCA 1985). Reasonable expectation of future projects is the polestar of cumulative impact analysis. Chipola Basin Protective Group v. Department of Environmental Regulation, 11 F.A.L.R. 467, 477 (D.E.R. December 29, 1988). Testimony at the hearing showed that the Department conducted an evaluation of the project for cumulative impacts and was unable to identify any such impacts. Wilber PF-30, TR-949-950; Armstrong TR-1021-1022. A finding that the Department conducted a cumulative impact analysis and concluded that it was unable to identify any cumulative impact was proposed by Sarasota County in its Proposed Recommended Order, paras. 118 and 119. - These findings were accepted by the Hearing Officer (R.O. at 22). Therefore, the requested findings of fact have already been made by the Hearing Officer, and no additional finding is required of me. The exception is therefore rejected. MPS Exception No. 18 asks me to adopt numerous proposed findings of fact which the Hearing Officer expressly rejected. The Hearing Officer expressly ruled on each of these proposed findings of fact. (Recommended Order at 23-24) Where exceptions merely reiterate proposed findings of fact which had been asserted before the Hearing Officer, and where the Hearing Officer clearly and specifically addressed each in the recommended order, I am not required to provide any further explicit reasons for my ruling. Britt v. Dept. of Professional Regulation, supra. I concur with and adopt the Hearing Officer's rulings on these proposed findings of fact. I therefore reject the above exceptions. RULINGS ON EXCEPTIONS TO CONCLUSIONS OF LAW Public Interest Test Sarasota County's Exception To Conclusion of Law No. 2, and MPS Exception No. 20 take exception to the Hearing Officer's conclusion of law that "the County has failed to establish that the proposed project is clearly in the public interest." Conclusion of Law No. 6, R.O. at 15-16. As I noted in my earlier discussion on findings of fact, in order to obtain a permit to dredge and fill in an Outstanding Florida Water, the applicant must show, among other things, that the project is clearly in the public interest. Section 403.918(2), Florida Statutes. Failure of the applicant to make that showing makes the project not permittable. In order to determine whether the project is clearly in the public interest, the Department must consider and balance the following seven factors set forth in Section 403.918(2)(a): Whether the project will adversely affect the public health, safety, or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of 5.267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. In order to consider and balance these factors it is necessary, of course, to make sufficient findings of fact as to each factor. As I discussed above, the Hearing Officer had accepted or expressly made findings of fact relevant to each of the above factors. in Conclusion of Law No. 6, she considered and balanced those factors in reaching her determination that it was not shown that the project is clearly in the public interest. I am, of course, not bound by the Hearing Officer's conclusions of law. I am free to substitute my own legal conclusions for those of the Hearing Officer, so long as competent, substantial evidence supports my legal conclusions. Harloff v. City of Sarasota, 16 FLW D458 (Fla. 2d DCA, Feb. 20, 1991); Hunter v. Dept. of Professional Regulation, 458 So.2d 842 (Fla. 2d DCA 1984); MacPherson v. School Board of Monroe County, 505 So.2d 682 (Fla. 3d DCA 1987); Section 120.57(1) (b)lO., Florida Statutes. I have considered and balanced each of the seven criteria set forth in Section 403.918(2) (a) in the light of the findings of fact discussed above. I concur in the Hearing Officer's conclusion that it has not been demonstrated that the project is clearly in the public interest. In reaching my conclusion I am aware of the holding in 1800 Atlantic Developers v. Department of Environmental Regulation, 552 So.2d 946 (Fla. 1st DCA 1989) that no net public benefit need be shown. I conclude that Findings of Fact Nos. 17, 22, 24-26, 29 and 32-35 on balance establish that the project will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. Findings of Fact 32 and 33 on balance show that the project will adversely affect the fishing or recreational values or marine productivity in LSB. Findings 30 and 38 on balance sfrthat the current conditiofr of LSB makes it a valuable estuarine ecosystem which will be lost if the project is permitted. Finding of Fact 36 and MPS proposed findings of fact Nos. 134 and 135, which were accepted by the Hearing Officer, on balance show a net benefit to navigation. And, the Hearing Officer's acceptance of Sarasota County's proposed finding of fact No. 50, and MPS's proposed finding of fact No. 74, allow me to conclude that the project will not adversely affect the public health, welfare or safety. I note that there is abundant proof that the project is permanent in nature and that there will be no adverse affect on historical or archaeological resources. When I consider and balance all of these factors and their relevant facts, I conclude that the adverse impacts outweigh any benefits, and therefore donclude that there has been no showing that the project is clearly in the public interest. Since I have determined that it has not been shown that the project is clearly in the public interest, I must also consider any mitigation which Sarasota County has proposed. Sarasota County and MPS contend that no mitigation is needed for the loss of ten acres of seagrasses because reopening the pass will result in recolonization of new areas of seagrass, greater density of growth in existing areas, and greater diversity of seagrass species. Even when I assume that Sarasota County's and MPS cotentions are true, I still conclude that the adverse effects of the loss of ten acres of seagrass will not be mitigated by the proposed project. 6/ Accordingly, I reject the exceptions. Water Quality Improvement Sarasota County Exception To Conclusion of Law No. 1, and MPS Exception No. 19, challenge the Hearing Officer's Conclusion of Law No. 4. Specifically, the exceptions challenge the statement that "[t]he County has not established, however, that the reopening of the inlet will somehow improve water quality and justify the proposed dredging." Conclusion of Law No. 1, R.O. at 14. To the extent that the Hearing Officer may have thought that a showing of improvement in water quality was a requirement for obtaining a permit, she erred. However, for the reasons set forth in my previous discussion of water quality in relation to findings of fact, Sarasota County and MPS had made improvement in water quality an issue in determining whether the project was clearly in the public interest. Rather than erroneously imposing a requirement of improvement of water quality, it appears that the Hearing Officer was merely making a predicite observation prior to conducting the public interest balancing test. Regardless of how one interprets the above matter, it is clear that the issue does not affect the outcome of this case because both the Hearing Officer and I have concluded that there has been no showing that the project is clearly in the public interest. I therefore reject the exception on the basis that the conclusion of law is not erroneous, or if error, then it is harmless error. Having ruled on all of the exceptions it is ORDERED: Except as is otherwise stated in this Final Order, the Hearing Officer's Recommended Order is adopted and incorporated herein by reference. Sarasota County's Permit Application No. 581473069 is DENIED. NOTICE OF RIGHTS Any party to this Final Order has the right to seek judicial review of the Order pursuant to Section 120.68, Florida Statutes, by the filing of a Notice of Appeal pursuant to Rule 9.110, Florida Rules of Appellate Procedure, with the clerk of the Department in the Office of General Counsel, 2600 Blair Stone Road, Tallahassee, Florida 32399-2400; and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate District Court of Appeal. The Notice of Appeal must be filed within 30 days from the date this Order is filed with the clerk of the Department. DONE AND ORDERED this 4 day of April, 1991, in Tallahassee, Florida. State of Florida Department of Environmental Regulation CAROL BROWNER Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL. 32399-2400

Recommendation Based upon the foregoing, it is RECOMMENDED that the Department of Environmental Regulation enter a final order denying the permit requested by Sarasota County. DONE and ENTERED this 19 day of February, 1991, in Tallahassee, Leon County, Florida. Joyous D. Parrish Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19 day of February, 1991. APPENDIX TO CASE NO. 90-3533 RULINGS ON THE PROPOSED FINDINGS OF FACT SUBMITTED BY THE DEPARTMENT: Paragraphs 1 through 19 are accepted. Paragraphs 20 through 24 are rejected as irrelevant, speculative or immaterial to the issues of this case. Paragraphs 25 and 26 are accepted. Paragraphs 27 through 29 are rejected as irrelevant. Paragraph 30 is accepted. Paragraph 31 is accepted with the deletion of the quotation marks around the word monitor and with the deletion of the last phrase following the words "survival rate" which is rejected as argumentative or irrelevant or not supported by the record. Paragraphs 32 through 36 are accepted. Paragraph 37 is rejected as repetitive. Paragraphs 38 through 40 are accepted. Paragraph 41 is rejected as contrary to the weight of the evidence. Paragraphs 42 through 44 are accepted. Paragraph 45 is rejected as irrelevant or unnecessary to the resolution of the issues of this case. Paragraphs 46 through 48 are accepted. Paragraphs 49 through 53 are rejected as irrelevant, unnecessary to the resolution of the issues, comment, repetitive, or argumentative. Paragraphs 54 through 62 are accepted. Paragraph 63 is rejected as repetitive. Paragraph 64 is rejected as irrelevant. Paragraphs 65 and 66 are accepted. Paragraph 67 is rejected as irrelevant or contrary to the weight of the evidence. Paragraphs 68 through 73 are accepted.

Florida Laws (5) 120.57120.68267.061403.03190.104
# 3
CITY OF COCOA BEACH AND DEPARTMENT OF COMMUNITY AFFAIRS vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002113 (1979)
Division of Administrative Hearings, Florida Number: 79-002113 Latest Update: Apr. 30, 1980

Findings Of Fact The City of Cocoa Beach is proposing to maintenance dredge a channel which connects land areas of the City with the open waters of the Banana River in Brevard County, Florida. The channel runs approximately one and three-fourth miles from east to west. Nearest the shore the channel is approximately seven feet deep. As it extends out into the river, the channel has deteriorated to the point where at approximately halfway along its length it is only two feet deep. From that point until the end of the channel in the Banana River, it gets no deeper than three feet. Silt-like material has accumulated in the bottom of the channel. During low-water periods, many boats are completely unable to utilize the channel. Smaller boats which can use the channel are able to do so either because they plane above the channel bottom, or because they plow through the silty material. There are two other channels available for use which have not deteriorated to this extent, and even in low-water periods, boats unable to use the subject channel are not landlocked. The City proposes to remove approximately 9,761 cubic yards of material from the channel, and to deposit it adjacent to the channel in a partially submerged and partially dry area. Several small islands run parallel to the channel. These were created from spoil which resulted from the original construction of the channel. The City proposes to deposit material that it dredges from the channel onto three already existing islands, combining them into one island, which would be approximately 120 feet by 650 feet. The City proposes to contain turbidity which would result from the dredging and depositing operations by placing a turbidity screen around the filled area. The area where the proposed dredging and filling would take place is within an aquatic preserve as specified in the Aquatic Preserve Act, Chapter 258, Florida Statutes. The Banana River has been classified as Class III Waters. There is very little tide in the area of the proposed project, other than wind-driven tide. The islands which would be covered by fill from the channel if the permit is issued as proposed by the City are ringed with mangroves except in those places where erosion has taken place. The submerged areas which would be filled are dominated by aquatic grasses, primarily manatee grass and Cuban shoalweed. The mangroves and sea grasses form a productive area which serves as the base of the food chain in the river. The vegetation also serves to filter and uptake nutrients from the water. The area thus performs important environmental functions in serving as a part of the food chain for fish and other wildlife in the river, and in preserving the water quality of the river through the uptake of nutrients. The area that would be filled would amount to just over three acres. There are approximately 7,000 acres in the subject portion of the Banana River which are similarly dominated by aquatic grasses. While the area is small, it is significant both because it is especially productive, and because there has been considerable development along the shoreline of the Banana River, which puts stress on wildlife and water quality. Placing the fill on the area would obliterate the mangrove and sea grass communities, and would put an end to the significant environmental functions that the area now performs. The sediment that is in the channel and which would be placed on the mangrove and sea grass communities is a fine, silty material. It contains hydrogen sulfide, a toxicant to marine life. The material is presently largely contained within the channel. It is anaerobic, meaning that oxygen is not present in it, and it has an unpleasant smell. If the material is not contained, and it is allowed to spread across the flat sea grass areas, it will have an adverse effect upon the area. Biochemical oxygen demand would be dramatically increased in areas where the material spreads, and violations of the Department's standards for toxic substances would be likely. The City proposes to contain the material by placing a turbidity screen around the filled area. A plastic screen with a chain bottom would be installed around the filled area with stakes holding it in place. Such screens are very effective in containing turbidity under some circumstances. In connection with the instant proposed project, however, it is unlikely that the turbidity screens would be sufficiently effective. In the first place, the screen would be anchored by stakes. Turbidity screens are effective when they are anchored at both ends to upland areas. When they are not so anchored, their efficiency decreases. Furthermore, the material that would be contained in this instance is extremely fine. Turbidity screens are not as effective in containing fine, silty materials as they are with coarser materials. It is likely under the best circumstances that the silty fill would seep under the screen, and through any gaps that might occur. Since the screen would be contained by stakes in an area which is subject to wind-driven tides, it is likely that fissures would occasionally develop in the screen, and that the silty materials would escape from the confined areas. It is therefore likely that violations of the Department's standards for turbidity and for toxic substances would occur outside of the screened area. Since the silty material is a toxicant to marine plant and animal life, the effects of placing the fill in this area would be to measurably degrade water quality beyond the limits of the filled area. The problems inherent in placing the fill along the channel could be avoided by pumping the fill to an upland area. The City has considered this alternative; however, it has been advised that the cost of such pumping activities would increase the cost of the maintenance dredging from approximately $20,000 to in excess of $100,000. The City would not be able to afford the cost of the project under these circumstances. The City has not received any formal estimates for pumping the fill material to an upland area, but has received only an informal estimate that pumping beyond 2,000 feet would dramatically increase the cost. In order to get the material to an upland area, it would need to be pumped at least 8,000 feet.

Florida Laws (1) 120.57
# 4
G.A.P. HAYNES, BETTY H. HAYNES, ET AL. vs. J. EDWIN CHANCEY AND DEPARTMENT OF NATURAL RESOURCES, 76-001382 (1976)
Division of Administrative Hearings, Florida Number: 76-001382 Latest Update: Mar. 04, 1977

Findings Of Fact Respondents' File No. 76-3-V-90, is an application by J. Edwin Chancey for a variance from the coastal construction setback line in Walton County in an area referred to as Grayton Beach. The application for variance involves approximately 450-470 feet of open beach which the applicant proposes to divide into nine 50-foot wide lots upon which he proposed to construct dwelling houses. As shown by Exhibit 5 the proposed dwellings would be no less than approximately 150 feet and no more than approximately 300 feet seaward of the coastal construction setback line previously established by the Department of Natural Resources for Walton County and the subject beach area. The Department of Natural Resources' staff has recommended to the Governor and Cabinet as the Department of Natural Resources that the variance be granted subject to eight stated conditions set forth in Exhibit 2 of this proceeding. These conditions include the following: "1. No construction will be more than 150 feet gulfward of the most upland property line. All building structures will be constructed on open piling foundations with floor elevations above 14.5 feet mean sea level and pile tip penetration below 5 feet mean sea level. * * * The variance, if approved, will cover the construction of nine 50 foot lots in accordance with the subdivision plans on file in this office. . . . Construction plans on each lot will be submitted individually for staff review and if approved will be issued a variance placard for construction. The placard will be valid for construction commencing within six months and completion within 18 months. In the event septic systems are used, these systems will be installed on the landward most portion of the lots." On July 15, 1975, the Department of Natural Resources approved a variance from the coastal construction setback line requirements for a development with 30 lots proposed for the land involved in this application and an additional and contiguous 930 feet of beach. However, the developer experienced financial difficulties and as a result deeded away approximately two-thirds of the beach front property involved in that variance and abandoned the variance. The developer in that instance was J. Edwin Chancey. The land involved in this proceeding is generally open beach dunes interrupted by lakes. The engineer for the Department of Natural Resources estimated that the elevation of the subject property for which a variance is sought ranges from +3 feet mean sea level to +7 feet mean sea level except for the remnants of several large dunes which range from +10 feet mean sea level to +13 feet mean sea level. The area was somewhat higher prior to Hurricane Eloise which caused the dunes to recede on the average 55 feet and reduced 20 foot dunes to their current elevation of +10 feet to +13 feet mean sea level. Several hundred yards east of the subject property there is a large body of water known as Western Lake. Western Lake is connected directly to the Gulf by an open water course presently located 200-400 feet east of the subject property. This natural water course historically migrates to the west from its present general location in a series of migrations. As its length increases its efficiency decreases so that periodically it moves back to the east to begin again its western migration. This natural water course, in its western migration, has, in the past, encroached on the property for which a variance is herein sought. It appears that, absent an artificial barrier, this natural water course is likely in the future to migrate westward to the subject property. This water course is sometimes deep enough to accommodate an outboard boat and can be 150 feet or more wide. During Hurricane Eloise, the construction site on the property for which the variance is sought had approximately 3 feet to 4 feet of standing water. The Applicant has not provided the Department of Natural Resources with evidence of his ownership of the property for which he seeks a variance. It appears from the evidence presented that the Applicant is not the sole owner of the property, but may be a part-owner with three other persons. The Applicant has not provided the Department of Natural Resources with a duly executed statement from the owners of record consenting to the work, activity, or construction for which the variance has been requested. No statement of the specific reasons why the Applicant feels that the variance should be granted has been received by the Department of Natural Resources. There have been communications between staff members of the Department and the Applicant or his representatives, but apparently these communications dealt with the details of the requested variance rather than the reasons why the variance should be granted. The Department of Natural Resources has not received a recent topographic survey showing the plot plan of the proposed construction. The Department has received a topographic survey and a plot plan showing the position of the proposed nine lots. (See Exhibits 5 and 9) Exhibit 5, on Lots 1, 2, 6 and 8 does show what appears to be the plot plan of some structure, though apparently, the Applicant does not necessarily intend to construct dwellings in accordance with those drawings. The Department of Natural Resources has not received construction plans showing cross sections of all sub-grade construction or excavation, elevations of the lowest floor and the first dwelling floor, or the details and justification for any proposed waste water discharge unto, over, under or across the beach and/or dunes. The Applicant has verbally communicated to the Department that if septic tanks are used on the subject property they will be located as far landward as possible with no discharge toward the Gulf. No further details of this proposed wastewater discharge have been submitted to the Department. According to the engineer for the Department there will be sub- grade construction. However, the plot plan (Exhibit 5) showing the location of the proposed nine lots is apparently the only plan received by the Department with regard to this request for a variance. No evidence was presented showing that the Department has waived any of the requirements for an application for variance set out in Section 16B- 25.05, F.A.C. The engineer for the Department whose responsibility it was to initially review and make recommendations with regard to the application for variance testified that he did not believe that he had the authority to waive the above requirements and that he did not know who, if anyone, within the Department had that authority. He did not make any recommendation that the requirements be waived and did not know if the requirements had been waived. The application for variance which is the subject of this proceeding was received by the Department of Natural Resources no earlier than November, 1975, and was given the Department File No. 76-3-V-90. The application is a series of documents rather than a formal application. The Applicant had sought variances for a larger piece of property which included the subject property which variances would have allowed up to 128 dwelling units. Those requests for variances predated that which is the subject of this proceeding and were apparently given different file numbers by the Department of Natural Resources and were considered separate applications. The Petitioners, W. A. Covell and Bonnie Covell, own property in the community of Grayton Beach upon which there is a house. Their property is approximately 700 feet or more from the open beach property for which a variance is sought and does not abut the subject beach property. The Covell's think that construction of the nine dwelling units which would be allowed by the variance would lower the value of their property. Petitioners Jennings N. Byrd and Mrs. J. N. Byrd own property in the community of Grayton Beach upon which there there is a dwelling house. Their property is approximately 750 feet to 800 feet from the beach property for which a variance is sought. Mr. Byrd testified that he felt his interest in objecting to the variance was the same as that of any other Florida citizen. He further testified that he did not mind his view being obstructed by the dwelling units proposed by the Applicant. All Petitioners and their families have used the open beach area of which the property for which a variance is sought is a part, for many years as a picnic, sunning and swimming area. Petitioners G.A.P. Haynes and Betty H. Haynes own, in the name of Mrs. Haynes, property which is immediately adjacent to Applicant's property. The Haynes own a dwelling house which is located approximately 100 feet from Applicant's property. It is the opinion of the Haynes that the construction of the nine dwelling units in front of their house as proposed by the Applicant would lower the value of their property. The Haynes further indicated their concern that construction on the beach in front of them, because of the apparent inherent instability of the shifting sands, would have an adverse impact upon their house in times of high wind and water. They recounted seeing water standing, as the result of storms other than hurricanes, on Applicant's property and near their house.

Florida Laws (2) 120.57161.053
# 5
DEPARTMENT OF COMMUNITY AFFAIRS vs JOHN E. SCOTT, ALICE J. SCOTT, HUGH E. RHODUS, AND MONROE COUNTY, 93-004565DRI (1993)
Division of Administrative Hearings, Florida Filed:Homestead, Florida Aug. 17, 1993 Number: 93-004565DRI Latest Update: Dec. 14, 1994

The Issue At issue in this proceeding is whether a development order (building permit) issued by Monroe County to John and Alice Scott, Owners, and Hugh E. Rhodus, General Contractor, for the construction of a vertical seawall/dock on Lots 31 and 32, White Marlin Beach subdivision, Matecumbe Key, Monroe County, Florida, is consistent with the Monroe County Comprehensive Plan and land development regulations.

Findings Of Fact The Property Respondents John and Alice Scott are the owners of two canal front lots known as Lots 31 and 32, White Marlin Beach subdivision, Matecumbe Key, Monroe County, Florida. Lots 31 and 32 were acquired in 1968 and 1970 and are undeveloped. The subject lots are in incorporated Monroe County, Florida, and are zoned Improved Subdivision (IS). The Scotts reside on a third lot facing the bay that is across the street from the subject lots. Respondents' lots are within the Florida Keys Area of Critical State Concern. The land where the White Marlin Beach subdivision is located was at one time all mangroves and other trees. The subdivision was created in 1955-56 by means of dredge and fill activities. During the late 1960s and early 1970s, the shorelines of Lots 31 and 32 were even with an existing bulkhead on an adjacent lot. Very small mangroves were beginning to revegetate the shorelines. By 1979-1980, some shoreline erosion had occurred on the lots, estimated at 5-6 feet. At some unknown time thereafter, additional shoreline erosion occurred, estimated at its greatest point to be approximately 10 feet from the original platted fill line. At the time the permit application was considered and at the time of the hearing, the revegetated mangroves had grown into a substantial fringe of high complexity, running the entire 117-foot length of the two lots and varying from 5 to 15 feet in width. Some of the trees are as tall as 12 feet. The area in which the mangroves have revegetated slopes gently toward the canal. It constitutes a shallow water habitat which, in addition to the mangrove vegetation, supports crabs, juvenile fish, algae, and seagrasses. The expert witnesses of both Petitioner and Respondent testified that the mature mangrove fringe on the two lots has stabilized the land area adjacent to the canal. Landward of the mangrove fringe, the lots are comprised of unconsolidated sand used to create the lots. The edges of the fill material form a gentle slope from as low as six inches up to 24 inches at one extreme. Upland erosion is occurring along the edge of the unconsolidated fill, washing down the slope of the fill into the mangroves. Erosion of the edges of upland fill is a common occurrence in the Florida Keys. 10 The unconsolidated fill material where the erosion is occurring constitutes the uplands portion of the lots and is caused by weather events (wind and rain), rather than by tidal or wave action. There is active boating traffic on the subject canal; many large commercial and pleasure boats use the canal. Marine fuel and supplies are sold at Angelo's. There is a commercial fishing "village" located at and around Angelo's. To reach open water, i.e., the Gulf bay, boats must pass lots 31 and 32 after leaving Angelo's. Most of the other lots on the same canal as lots 31 and 32 are primarily protected by seawalls. The Scotts, under the subject seawall permit, are seeking to tie in to the adjoining seawall for consistency in community character and appearance. The adjoining property owners and many of the neighboring property owners want the mangroves removed and a seawall built to protect lots 31 and 32. Permit Application and Issuance On March 11, 1992, the Scotts applied to Monroe County for a permit to construct a seawall on Lots 31 and 32, White Marlin Beach subdivision. The Scotts' seawall permit application was denied by Pat McNeese, the Monroe County Environmental Resources Director, based upon her conclusion that erosion was not occurring on the lots and thus a seawall was not allowed under the Monroe County land development regulations. The Scotts appealed Ms. McNeese's decision to the Monroe County Planning Commission. As part of their evidence, Respondents offered a certified land survey conducted on November 1, 1992, which shows that the approximate shoreline of the property is at its greatest point roughly 10 feet landward of the platted shoreline. After hearing, the Planning Commission upheld Ms. McNeese's decision to deny the permit. The Scotts then appealed the Planning Commission's decision to the Monroe County Board of County Commissioners. The Board overturned the Planning Commission. The Board found that the Scotts are entitled to a permit to develop a seawall for erosion control under the provisions of Section 9.5-345(m)(2)(b), Monroe County Code. On April 19, 1993, Monroe County issued building permit number 9230005939 which is the subject of this proceeding. The permit was rendered to the Department on April 21, 1994, and was appealed by the Department 45 days thereafter. Monroe County Comprehensive Plan and Land Development Regulations The Monroe County Comprehensive Plan contains various policies directed toward preservation or conservation of the Keys environment and maintenance of water quality. Section 2.104, Nearshore Waters, Monroe County Comprehensive Plan, Volume II, Future Land Use Element, states, in part, that: The Florida Keys are dependent on nearshore water quality for their environmental and economic integrity. The heart of the Florida Keys economy, the means by which Monroe County exists as a civil and social institution, is based on its unique, oceanic character. If nearshore water quality is not maintained, then quality of life and the economy of Monroe County will be directly and immediately impacted. OBJECTIVES 1. To protect, maintain and, where appropriate, improve the quality of nearshore waters in Monroe County. * * * POLICIES 1. To prohibit land uses that directly or indirectly degrade nearshore water quality. * * * To prohibit the development of water dependent facilities, including marinas, at locations that would involve significant degradation of the biological character of submerged lands. To limit the location of water-dependent facilities at locations that will not have a significant adverse impact on off-shore resources of particular importance. For the purposes of this policy, off-shore resources of particular importance shall mean hard coral bottoms, habitats of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet, and all designated Aquatic Preserves under Ch. 253.39 et seq. the [sic] Florida Statutes. The Monroe County Comprehensive Plan, Volume II, Sec. 2-115 entitled "Enforcement" provides: A major component of any future land use element is the need to strictly enforce implementing regulations. If Monroe County is to achieve the promise of this Plan, it is essential that all persons involved in the land development process adhere to the requirement of this Plan and that the integrity of the development review process be protected. The Monroe County Comprehensive Plan, Future Land Use Element, Volume II, Natural Vegetation Management Policies provides: In recognizing the need to preserve as much natural vegetation as possible, the County will direct its land use and development regulations to minimize destruction of natural vegetation and modification of landscape. Guidelines and performance standards designed to protect natural vegetation from development will be developed and enforced. Clearing of native vegetation for development will be controlled. * * * 3. Regulations controlling development in areas characterized primarily by wetland vegetative species such as mangrove and associated vegetation will emphasize preservation of natural vegetation to the maximum degree possible. * * * 8. The existing County ordinances designed to protect and conserve natural vegetation will be strictly interpreted, rigidly enforced, and/or amended when necessary. * * * Of all the natural landforms and features which must be given due consideration in their protection, protection of the shoreline is of prime concern. . . . Chapter VII, Coastal Zone Protection Element, Marine Resources Management Policies section, Future Land Use Element, Monroe County Comprehensive Plan, Volume II, states that: Recognizing the crucial role that the marine environment plays in the local economy, the protection, conservation, and management of marine resources will be viewed as an issue requiring the County's utmost attention. In an effort to protect and conserve marine resources, emphasis will be placed on protecting the entire marine eco-system. 1.2. To this end, maintenance of water quality; protection of marine flora and fauna, including shoreline vegetation; and preservation of coral reefs will be regarded as being absolutely essential to maintaining the integrity of the marine system. Utilization of marine resources will be judged sound or unsound from the standpoint of whether or not a permitted use insures conservation and long-term maintenance of the resource. * * * Land and water activities which are incompa- tible with the preservation of marine resources because of their potential adverse effects will be prohibited, restricted, or carefully regulated depending upon the nature of the activity and the extent of potential impact. Development of bulkheads (the vertical component of a seawall) is characterized in the Monroe County Comprehensive Plan as "shoreline modification" and is addressed in Volume II as follows: Shoreline Modification Shoreline generally requires some degree of modification before it can be utilized for development of any sort. But such modification, unless carefully planned, can have adverse effects far beyond the area directly altered for development. For this reason, all shoreline modifications are subject to close scrutiny and regulation by local, State and Federal agencies. The following guidelines should be used at the local level to minimize the impact of shoreline modifications of different types. Bulkheads and Bulkhead Lines Bulkhead lines should be set at, or landward of, the mean high water line or the landward boundary of the shoreline protection zone, which- ever is applicable. Where possible, sloping rip-rap structures and coastal vegetation should be used rather than vertical seawalls. The Monroe County land development regulations provide in pertinent part: Sec. 9.5-288. Bulkheads, seawalls, riprap and fences. Bulkheads, seawalls, riprap and fences may be allowed as principal uses where it is demonstrated that their purpose is for erosion protection or upland protection (except for the Big Pine Area of Critical County Concern). Seawalls, in any configuration to include integral steps, ladders, platforms, quays, wharfs, and integral docks landward of seawalls, are permitted, with or without a principal building, in all land use districts for the purpose of erosion control. . . . Riprap placement is permitted without a principal structure for erosion control. * * * Sec. 9.5-335. Purpose of environmental perform- ance standards. It is the purpose of this division to provide for the conservation and protection of the environmental resources of the Florida Keys by ensuring that the functional integrity of natural areas is protected when land is developed. * * * Sec. 9.5-345. Environmental design criteria. (m) Mangroves and Submerged Lands: Except as provided in paragraph (3), only piers, docks, utility pilings and walkways shall be permitted on mangroves and submerged lands; All structures on any submerged lands and mangroves shall be designed, located and constructed such that: All structures shall be constructed on pilings or other supports; Bulkheads and seawalls shall be permitted only to stabilize disturbed shorelines or to replace deteriorated existing bulkheads and seawalls; * * * d. No docking facility shall be developed at any site unless a minimum channel of twenty (20) feet in width where a mean low water depth of at least minus four (4) feet exists; No fill shall be permitted in any natural water body; No fill shall be permitted in any manmade water body unless the applicant demonstrates that the activity will not have a significant adverse impact on natural marine communities. * * * Sec. 9.5-4. Definitions. (W-1) Water at least four (4) feet below mean sea level at mean low tide means locations that will not have a significant adverse impact on off- shore resources of particular importance. For the purpose of this definition, "off-shore resources of particular importance" shall mean hard coral bottoms, habitat of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet and all designated aquatic preserves under Florida Statutes section 258.39 et seq. The land development regulations must be implemented in a manner consistent with the Monroe County Comprehensive Plan. Seawall The shoreline is generally the area between mean high water and mean low water. For regulatory purposes, the "shoreline" is considered to be mean high water. While a seawall will protect shoreline property, there are negative impacts associated with development of seawalls which merit consideration. In this case, development of the permitted seawall would involve elimination of the existing mature mangrove fringe, which filters upland runoff, and filling in the shelf, including submerged lands, which provides habitat for juvenile fish, crabs and algae. Water quality in the White Marlin Beach canals will deteriorate as additional seawalls are constructed. Wave force is increased as waves bounce off one seawall and then another, which in turn brings up sediments which may contain pollutants. Increased wave force also draws sediments out from under existing bulkheads, causing or contributing to their deterioration and adding to the suspended sediments in the canal. Riprap and coastal vegetation absorb rather than intensify wave energy. While some amount of shoreline erosion occurred on Lots 31 and 32 during the 1970s and at some time thereafter, the shorelines on Lots 31 and 32 are now stabilized by the existing mangrove fringe. Since the shorelines of Lots 31 and 32 are not presently eroding, that portion of the permit which authorizes the removal of the shoreline vegetation and development of a vertical seawall is not consistent with the Monroe County land development regulations. Rip-Rap Even if shoreline erosion were occurring, a seawall or bulkhead to stabilize the shoreline would still not be authorized under the Monroe County Comprehensive Plan and land development regulations. The shoreline on Lots 31 and 32 is gently sloping, with only about 1-1/2 feet of silt over the bedrock within the mangrove fringe. Rip-rap would be feasible on Lots 31 and 32 if shoreline erosion were to be currently taking place. Upland Erosion The Scotts are experiencing some erosion on the edges of the upland fill on Lots 31 and 32, caused by wind, rain, digging crabs, and the spreading roots of mangrove trees. Such erosion on the edges of upland fill is common in the Florida Keys. Construction of a vertical seawall, which is a shoreline stabilization technique, is not appropriate to address an upland erosion problem. Erosion of upland fill material is commonly addressed by use of a retaining wall landward of the shoreline. Development of a retaining wall on Lots 31 and 32 would not necessitate removal of the existing shoreline vegetation and placement of fill on submerged lands as authorized under the subject permit. Fill Behind Seawall The plans approved with the subject permit authorize the placement of fill behind the seawall. A portion of the proposed fill would be placed below mean high water on submerged lands. Section 9.5-345(m)(2)(4), Monroe County Code, prohibits the placement of fill in a manmade water body unless the applicant demonstrates that the activity will not have a significant adverse impact on natural marine communities. The mangrove community and submerged shelf that exist on lots 31 and 32 are natural marine communities. The permanent obliteration of the shoreline vegetation and elimination of the submerged lands that presently exist on Lots 31 and 32 would be a significant adverse impact on natural marine communities. Accordingly, the placement of fill on the submerged lands on Lots 31 and 32 is not authorized under the Monroe County land development regulations. Docks Section 9.5-345(m)(2)(d), Monroe County Code, requires that docking facilities be developed only where a water depth of at least minus four feet mean low water (-4 MLW) exists. The plans approved under the subject permit show a water depth of zero (0) feet MLW at the waterward extent of the proposed seawall/dock. The Scotts' intention is to align the seawall spanning Lots 31 and 32 with a seawall on an adjacent lot. Water depth in that approximate location, which differs from the approved site plan and is therefore not authorized by the permit, is 1.6 feet at low tide. There is not adequate water depth at the waterward side of the proposed seawall/dock, as shown either on the approved plan or as described in testimony, to accommodate a docking facility on Lots 31 and 32. Further, because the dock has a vertical seawall component, it is not designed to be constructed on pilings or other supports, as required by Section 9.5-345(m)(2)(a), Monroe County Code. Accessory Use The Monroe County land development regulations define an accessory use or structure as a use or structure that serves a principal use and is located on the same lot or lots under the same ownership and in the same land use district as the principal use or structure. The regulation specifically prohibits the establishment of an accessory use prior to the principal use to which it is accessory. Accessory uses are generally regulated based upon whether the accessory use is located on the same property as the principal use. Under the County definition of accessory use, when dealing with a single lot, the principal use must be established first. The reference to the plural "lots" accommodates larger projects which typically encompass more than one lot, such as hotels and multifamily projects. It would also encompass an individual's residence where the lots were aggregated for development. The intent of the regulation is not to restrict the accessory uses to any one of those individual lots, but to recognize that the accessory use can also extend and cover all of the lots where the principal use is located. The regulation was adopted to cure an ongoing problem in the Keys of speculative development where shoreline improvements were developed without the establishment of principal uses to increase the value of saleable lots. In this case, the principal use (the Scotts' residence) is not located on either of the two lots for which the permit was issued. To allow development of those properties prior to the establishment of principal uses on them would be inconsistent with the Monroe County land development regulation and the purpose for which it was adopted.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Land and Water Adjudicatory Commission enter a final order denying permission to develop the vertical seawall/dock authorized under Monroe County building permit number 9230005939 and denying all other relief requested by the Respondents. It is further recommended that such final order specify those items set forth in paragraphs 45 and 46, Conclusions of Law, as changes in design and circumstances necessary to enable the Scotts to obtain a permit to stabilize the upland fill on the lots and entitle them to a permit or permits for docking facilities. DONE AND ENTERED this 14th day of October 1994 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October 1994. APPENDIX The following are the specific rulings on all proposed findings of fact submitted by all parties. Findings proposed by the Petitioner: With the one exception mentioned immediately below, all proposed findings of fact submitted by the Petitioner have been accepted, with occasional editorial modifications in the interest of clarity and accuracy. The one exception is paragraph 25, which was rejected as unnecessary repetition or summary of findings already made. Findings proposed by the Respondents: Paragraph 1: Accepted in substance. Paragraph 2: Rejected as subordinate and unnecessary details in view of the de novo nature of this proceeding. Paragraphs 3, 4, 5, 6, 7, 8, 9, and 10: Accepted in substance. Paragraph 11: Rejected as contrary to the greater weight of the evidence. (There is conflicting evidence on this subject. The testimony of the Petitioner's witnesses is found to be more persuasive than the version put forth by the Respondents' witnesses.) Paragraph 12: Accepted in substance. Paragraphs 13 and 14: Rejected as subordinate and unnecessary details. Paragraphs 15 and 16: Both of these paragraphs are rejected as too overly broad and imprecise to be meaningful in the context of the issues in this proceeding. More precise and detailed findings have been made regarding the nature of past and current erosion on the subject property. Paragraph 17: Rejected as too narrow a statement to be accurate. As noted in the findings of fact, other factors are contributing to the upland erosion. Paragraph 18: Rejected as not supported by persuasive competent substantial evidence. Although there is some testimony along the general lines of what is proposed in this paragraph, that testimony appears to be more nearly hyperbole than hard science. Paragraph 19: Rejected as consisting primarily of argument, rather than proposed findings of fact. Further, the last sentence of this paragraph is a conclusion that is contrary to the greater weight of the evidence. Paragraph 20: Rejected as consisting primarily of argument and proposed conclusions of law, rather than proposed findings of fact. Paragraph 21: First two sentences rejected as subordinate and unnecessary details in view of the requirements of the Monroe County Comprehensive Plan and land development regulations. Last sentence rejected as constituting a conclusion that is contrary to the greater weight of the evidence. Paragraph 22: Rejected in part as not fully supported by persuasive competent substantial evidence and in part as irrelevant. (The water being too shallow, it does not particularly matter why it is too shallow.) Paragraph 23: Rejected as subordinate and unnecessary details in view of the requirements of the Monroe County Comprehensive Plan and land development regulations. Paragraph 24: Accepted in substance with some editorial language omitted. Paragraphs 25 and 26: Rejected as constituting conclusions that are contrary to the greater weight of the evidence. COPIES FURNISHED: Sherry A. Spiers Assistant General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Carol A. Scott, Esquire KUBICKI, DRAPER, GALLAGHER & MCGRANE, P.A. 1200 City National Bank Building 25 West Flagler Street Miami, Florida 33130 James T. Hendrick, Esquire 617 Whitehead Street Key West, Florida 33040 David K. Coburn, Secretary Florida Land & Water Adjudicatory Commission 311 Carlton Building Tallahassee, Florida 32301

Florida Laws (9) 120.57120.66253.39258.39380.032380.05380.0552380.07380.08
# 6
MICHAEL PAULSSON vs GULF COUNTY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-004576 (1996)
Division of Administrative Hearings, Florida Filed:Port St. Joe, Florida Sep. 26, 1996 Number: 96-004576 Latest Update: Jun. 16, 1997

The Issue Whether the application of Respondent Gulf County (County) for permit to install a beach access road, constructed of oyster shell or dolomite, at the stumphole area on Cape San Blas should be granted.

Findings Of Fact On April 11, 1996, the County applied for a permit from DEP to install a beach access road constructed of oyster shell or dolomite over an area 275 feet in length by 12 feet wide at the stumphole area on Cape San Blas. The County owned the property at the site where a crude road bed to the beach already existed. On that same date, County Manager Donald Butler met with a DEP field engineer, William Fokes, on the site to determine the linear footage that would be necessary for the access road at the stumphole area. Fokes then issued the field permit for the access road to be constructed of oyster shell or dolomite over an area 275 feet in length by 12 feet wide. Since beach driving is permitted by the County in the area, the access road aids in preventing illegal crossing of beach dunes by motorists to get to the beach. Prior to issuance of the field permit and construction of the access road, the only legal motorist access to the beach was seven miles away. Permits to drive on the beach are issued by the County. DEP rules require that all applicants proposing to conduct permitted activities on a beach use a designated beach access. This road will allow access to conduct permitted activities, thereby preserving and enhancing public beach access. DEP will not permit a project that is expected to adversely impact the beach dune system. Although seaward of the Coastal Construction Control Line (CCCL) in the County, the area which is the subject of this field permit contained no dunes or vegetation since Hurricane Opal had flattened the area. Such a project cannot be permitted if the project will adversely impact existing upland property or property of others. In the instant case, neither the Petitioner’s property, which is located two miles away from the project site, or property of other owners in the area will be adversely impacted. The road is designed to be a non-rigid, pervious structure which causes less impact to any existing dune system. The road site is located on County property and provides logical and appropriate access. The construction of the road did not violate DEP prohibitions on permitting activities having adverse impact to marine turtles since the construction permit expired prior to the turtle nesting season. A requirement of field permit issuance is that the applicant and the DEP area engineer meet on site and review the project. This event occurred on April 11, 1996, when Butler and Fokes met on the site. Fokes determined that the project was within field permitting guidelines and issued the permit. Fokes was authorized to issue the field permit because the project fell in DEP’s category of a driveway or similar activity. Expected impacts of construction of the access road and a driveway are deemed similar by DEP. Subsequent review by DEP staff of Fokes’ issuance of the field permit determined that sufficient information had been provided to him for issuance of the permit, that the project falls in the category of minor activity and that no adverse impact to dunes, property of others, beach access or nesting marine turtles is expected.

Recommendation Based upon the foregoing findings of fact and the conclusions of law, it is, RECOMMENDED: That a final order be entered confirming the grant of the field permit which is the subject of this proceeding. DONE and ENTERED this 9th day of May, 1997, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 9th day of May, 1997. COPIES FURNISHED: Lynette L. Ciardulli, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, FL 32399-3000 Michael Paulsson, Pro Se Route 1, Box 347B Port St. Joe, FL 32456 Timothy J. McFarland, Esquire Post Office Box 202 Port St. Joe, FL 32457 Virginia B. Wetherell, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399-3000 Perry Odom, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, FL 32399-3000

Florida Laws (2) 120.57161.053 Florida Administrative Code (1) 62B-33.005
# 7
KENNETH G. STEVENS AND CHIRL M. STEVENS vs DEPARTMENT OF NATURAL RESOURCES, 90-001507 (1990)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Mar. 05, 1990 Number: 90-001507 Latest Update: Sep. 20, 1990

Findings Of Fact On December 12, 1988, Petitioners filed an application with Respondent for a permit to construct improvements to real property seaward of the coastal construction control line (CCCL). Petitioners' property is located at 2400 North Atlantic Boulevard, Fort Lauderdale, Florida. The parcel of land owned by Petitioners measures approximately 50' in width and 140' in depth and is located in a primarily residential area of beachfront property with high property values. On this parcel is a residence that is approximately 1600 square feet in size. The residence is constructed on reinforced concrete pilings. There are many other residential and commercial structures in this area which are also constructed on reinforced concrete pilings. The improvements to this property seaward of the CCCL that Petitioners desire to make and that Respondent finds objectionable is the construction of a poured monolithic reinforced concrete slab patio supported by twenty-one reinforced concrete pilings. The patio would be approximately 27' by 50' in size. On November 17, 1987, Respondent approved an application filed by a previous owner of this property for the construction of a patio to be constructed with concrete pavers. Petitioners arranged to have the previously approved permit transferred to their name. The project contemplated by the subject application employs a different method of construction than the one permitted in 1987 because Petitioners desire to have a patio that is more attractive and is easier to maintain. Petitioners are also concerned that concrete pavers will be hazardous during a storm since they may be subject to being swept along by high winds and water. Petitioners have valid reasons for preferring the method of construction reflected by the subject application based on aesthetic and maintenance considerations. However, Petitioners did not establish that the proposed method of construction was necessary as a safety measure. To the contrary, the greater weight of the evidence was that blocks the size of the pavers to be used for the construction that has been permitted would not be propelled by either hydrodynamic or aerodynamic forces during a major storm as Petitioners contend. Instead, these blocks would likely be undermined during a major storm and, because of their weight, fall as the beach is eroded. Respondent has regulatory authority over the property in question. Respondent's regulatory authority, which includes rule making authority, is conferred by statute. Respondent's responsibilities include the preservation of the beach-dune area within its jurisdiction. There is a relationship between the siting of a structure, in terms of its proximity to the shoreline, and the likelihood that the structure will have an impact on the beach and dune systems. The subject patio is to be located within the beach-dune system. The patio Petitioners propose to construct on concrete pilings would have more of an adverse impact on the beach-dune system than a patio constructed of concrete pavers. During a major storm, greater erosion on the site around the pilings will occur as a result of scour. Following a major storm, the ability of a dune to re-form will be more inhibited if the patio is supported by pilings. Considering the hundreds of thousands of pilings that are already in place along the beach, the effect of the twenty-one pilings proposed by Petitioners, whether considered individually or cumulatively, will be insignificant. A patio is usually considered by Respondent to be a "minor structure". "Minor structures" are non-habitable structures that are generally designed to be expendable during a major storm event. Dune walkovers, viewing platforms, and decks are examples of minor structures. A patio constructed of concrete pavers would be another example. The nature of their construction permits minor structures to be placed more closely to the shoreline than major structures. The patio as proposed Petitioners has been properly categorized by Respondent as being a "major structure" since it is designed to withstand a major storm event. Respondent has not to date permitted any major structure as far east of the CCCL in this area of Broward County as Petitioner's proposed project. All major structures constructed on pilings that are that far east of the CCCL were built before permits were required. Respondent is concerned that the granting of the subject permit will set a precedent that will require the issuance of permits for the construction of other major structures as far seaward of the CCCL as the Petitioners' proposed project, and that such construction would result in a cumulative adverse impact on the beach-dune system.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That Respondent enter a final order which denies the subject permit. DONE AND ENTERED this 20th day of September, 1990, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of September, 1990. APPENDIX TO THE RECOMMENDED ORDER The following rulings are made on the proposed findings of fact submitted on behalf of the Petitioners. The proposed findings of fact in paragraphs 1-6 and 8-10 are adopted in material part by the Recommended Order. The proposed findings of fact in paragraph 7 are rejected as being contrary to the greater weight of the evidence. The proposed findings of fact in paragraph 8 are rejected as being argument. The proposed findings of fact in the first sentence of paragraph 11 are adopted in material part by the Recommended Order. The proposed findings of fact in the second sentence of paragraph 11 are rejected as being contrary to the greater weight of the evidence. The proposed findings of fact in the third sentence of paragraph 11 are rejected as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 12 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraph 13 are rejected as being conclusions of law that are unnecessary to the conclusions reached. The proposed findings of fact in paragraph 14 are rejected as being unsubstantiated by the evidence. While Petitioners' application included as a proposed condition to the issuance of the permit, a covenant running with the land that would require the property owner to reconstruct the beach-dune system in the event of destruction by a major storm, the evidence did not establish, as Petitioners proposed, that the covenant would "... protect the interests of DNR and its long term end of protecting the dunes and beaches". The following rulings are made on the proposed findings of fact submitted on behalf of the Respondent. The proposed findings of fact in paragraphs 1-2, 5-6, 10-16, 24-27, 30-31, and 33 are adopted in material part by paragraph 1 of the Recommended Order. The proposed findings of fact in paragraphs 3 and 4 are rejected as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 21 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraphs 7-9 and 28-29 are rejected as being unnecessary to the conclusions reached or as being subordinate to the findings made. The proposed findings of fact in paragraphs 17-20, 23, and 32 are rejected as being unnecessary to the conclusions reached. These proposed findings are incorporated in part as conclusions of law. The proposed findings of fact in paragraph 22 are adopted in part by the Recommended Order, and are rejected in part as being subordinate to the findings made. COPIES FURNISHED: Kenneth G. Stevens 412 Northeast Fourth Street Fort Lauderdale, Florida 33301 Dana M. Wiehle, Esquire Assistant General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Room 1003 Tallahassee, Florida 32399-3000 Tom Gardner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ken Plante General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (2) 120.57161.053
# 8
BARBARA ANN BUTLER vs. HARRY B. WILLIAMS AND DEPARTMENT OF NATURAL RESOURCES, 88-005439 (1988)
Division of Administrative Hearings, Florida Number: 88-005439 Latest Update: Apr. 27, 1989

Findings Of Fact On February 10, 1988 Harry B. Williams made application to the Department of Natural Resources for permission to construct a single-family dwelling with appurtenant structures at 2831 Ponte Verda Boulevard South, South Ponte Verda Beach, Florida. The permit sought was a coastal construction control line permit which would allow construction seaward of that line in the direction of the Atlantic Ocean. A copy of that permit application may be found as Department's Exhibit Number 2. Associated with the permit application was a description of the plans related to the dwelling and other structures. This application was received by the Department February 11, 1988. Following a review of the permit application the Department deemed it complete as of February 22, 1988. A site inspection was made of the property and a report was prepared by an employee with the Department, a Mr. Partel. The report may be found as Department's Exhibit Number 4, which includes photographs of the prospective building site, together with the surrounding property to include dwellings to the north and south of the lot where the Williams home would be built. As commented on by Mr. Partel the applicant had intended at that time to construct a single-family dwelling a maximum of 75 feet seaward of the coastal construction control line. Although this evaluator, Mr. Partel, felt that the applicant had requested the right to construct a dwelling which was in line with existing construction, he felt that it could be moved further landward and that it could be limited in deck size and that a cantilevened form of construction was preferable to the concrete called for in the plans set out in the application information. It was also suggested that the sea oats that were in the way of the construction should be relocated seaward on a dune face slope where a denuded area is found. In this connection, the Department is empowered to make suggestions to the applicant concerning the minimization of the adverse impacts on the beach-dune system. Following the site visit of February 26, 1988 the Department wrote the applicant on March 11, 1988 and indicated concerns about the proximity of the dwelling to the crest of the dune. A copy of this correspondence may be found as Department's Exhibit Number 5. In the correspondence the Department asked the applicant to move the proposed dwelling 10 feet landward and that the 10 foot wide concrete patio, on the seaward side, be modified to a 10 foot wide wooden deck. The letter told the applicant that the approval would be conditioned on the sea oats and other dune grasses that would be disturbed by the proposed structures being replanted seaward of the project in the denuded areas of the dune. The applicant agreed to these changes. The relocation of the structure 10 feet landward took it away from the beach- dune system. The modified site plan that was brought about by the suggested changes is found Department's Exhibit Number 6, a copy of that amended site plan. With the relocation the construction would be 66 feet seaward of the coastal construction control line. An aerial photograph of the site location reference the basic design of the dwelling and the proximity to the relevant or existing coastal construction control line is found as Department's Exhibit Number 3. In responding to the suggestions to the change in location the modified site plan which moved the dwelling 10 feet landward was received by the Department on August 1, 1988. Under this arrangement the applicant had agreed to waive the requirements of Section 120.60, Florida Statutes pertaining to the obligation by the Department to review and decide its action of grant or denial within 90 days of date of receipt of the application. With the changes being made to the location of the proposed dwelling and associated structures and the type of construction materials used in the patio on the seaward side, together with the relocation of the plant life, the impact on the beach-dune system and adjacent property is acceptable. There is no adverse impact on the beach-dune system or on the adjacent properties. The location of the proposed dwelling and its associated structures as it relates to the 30-year erosion projection under the terms of Section 161.053, Florida Statutes, in this instance, shows that the dwelling would be approximately 55 feet landward of the 30-year erosion projection and not at risk. Calculations related to this finding may be found within Department's Exhibit Number 7. The existing coastal construction control line dates from January 28, 1988. Although the original application referred to the previous line of 1978 in describing the site plan and survey, the reason for this was that the site plan and survey were prepared prior to the establishment of the January 28, 1988 line, as allowed. In the course of the hearing appropriate reference was made to the January 28, 1988 line as it relates to the anticipated location of the dwelling and other structures as modified at the instigation of the Department. As contemplated by Section 161.053(5)(f), the Department required the applicant to provide mitigation of the- effects of the construction as a condition to a grant of the permit. Those permit conditions may be found in the Department's Exhibit Number 8, a copy of a proposed final order. Included within those would be the requirements for erection of a temporary construction fence on the site to protect existing native dune vegetation from the impacts of that construction, in addition to the requirement of the dune vegetation relocation. This would involve the irrigation and application of fertilizer to those plants with the expectation that a certain percentage would survive over time as described in this special condition. This project will not pose a hazard to the sea turtle and its hatchlings and habitat for the sea turtles and hatchlings. Ms. Butler, Petitioner in this cause, has a beach home which is north of the Williams property separated by a 10 foot easement between those properties. In mid July, 1988 Ms. Butler offered a written statement in opposition to the placement and size of the proposed dwelling together with other remarks and asked that the Department provide her information and documents pertaining to the application under the authority of Chapter 119, Florida Statutes. On August 10, 1988 the Department dispatched a letter of inquiry to surrounding property owners to include Ms. Butler and solicited remarks concerning the Williams application to be provided on or about August 20, 1988. Ms. Butler had received certain documents from the Department concerning the application sometime in the middle of August 1988. On August 18, 1988 Butler made known her objection to the project on the grounds that the concerns about the 30-year erosion line and the size and placement of the dwelling. On September 2, 1988 the Department informed Ms. Butler of the intent to grant the permit to Mr. Williams. A copy of that correspondence may be found as Petitioner's Exhibit Number 5. This led to a timely request for hearing by Ms. Butler stating her opposition to this project. The request was received in accordance with the Department's advice that the request must be filed by September 26, 1988. Based upon the prehearing conference and the discussion of those issues which would be allowed for consideration as stated in the request for hearing and the statement of particulars that attend the request for hearing, commented on by the hearing officer at the commencement of the final hearing, and found within the transcript and further stated in the issues portion to this Recommended Order, this case has been carried forward. The presentation made by the Petitioner, after the Department and applicant had offered their cases, was through her testimony and that of employees of the Department together with exhibits she offered. The testimony of the Department employees concerned the procedural techniques that the agency pursued in reviewing the application at issue. Ms. Butler described her concern for her property, and the area between her property and the Williams property. This is the 10 foot easement area which is sparsely vegetated and low. As a consequence she was concerned that her property might be destroyed with the advent of the Williams construction. She has no expertise in her own right nor did she present expert opinion from other witnesses which would tend to bear out her concern. She also expressed the concern that the Williams home, in its dimensions, was too large and that it should be relocated an additional 10 feet back from the adjusted placement following the Department's criticism of the original application. In effect, she would have the house placed 20 feet away from the sea as compared to the original site plan submitted with the application on February 10, 1988. Again, there is no competent evidence presented which would support her theory that this further relocation was needed. Her expression of concern for the sea turtles and their hatchlings and habitat was not well founded. Turtles are known to nest on the sandy flat beach area and the construction of the Williams property will not interfere with that area adjacent to the ocean.

Recommendation Based upon a consideration of the facts and the conclusions of law reached, it is RECOMMENDED: That the Department enter a Final Order which grants a coastal construction control line permit to Harry B. Williams, Jr., based upon his modified plan required by the Department and upon the special permit conditions announced in the proposed final order, a copy of which is found as Department's Exhibit Number 8. DONE and ENTERED this 27th day of April, 1989, in Tallahassee, Leon County, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 1989.

Florida Laws (3) 120.57120.60161.053
# 9
STOP THE BEACH RENOURISHMENT, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND, 04-003261 (2004)
Division of Administrative Hearings, Florida Filed:Sandestin, Florida Sep. 17, 2004 Number: 04-003261 Latest Update: Sep. 20, 2005

The Issue The issue in this case is whether the Department of Environmental Protection (DEP) should grant the application of the City of Destin (City) and Walton County (County) for a Consolidated Joint Coastal Permit (JCP) and Sovereign Submerged Lands Authorization (Application) to restore a 6.9 stretch of beach in the City and County.

Findings Of Fact The Gulf of Mexico beaches of the County and City were critically eroded by Hurricane Opal in 1995. The erosion problem was identified by DEP, which placed the beaches on its list of critically-eroded beaches, and by the County and City, which initiated a lengthy process of beach restoration through renourishment (also called maintenance nourishment.)1 The process, which included an extensive studies2 and construction design, as well as pre-application conferences with DEP staff, culminated in the filing of the Application on July 30, 2003. The Application proposed to dredge sand from an ebb shoal (i.e., a near-shore) borrow area south of (i.e., offshore from) East Pass in eastern Okaloosa County, using either a cutter head dredge (which disturbs the sand on the bottom of the borrow area and vacuums it into a pipeline which delivers it to the project area) or a hopper dredge (which fills itself and is moved to the project site). On the project site, heavy equipment moves the dredged sand as specified in the design plans. The project is executed in this manner and progresses along the beach, usually at a pace of about 300-500 feet a day. Each day work is in progress, public access to the beach is restricted for a length of about 500-1000 feet in the immediate vicinity of the area of beach being worked. Water Quality Increased turbidity is the primary water quality concern in a project of this nature. Increased turbidity can adversely impact submerged seagrasses and hard-bottom habitat, along with the benthic communities depending on them. When sand in the borrow area is disturbed by dredging, sand and silt become suspended and increase turbidity to some extent and for some duration, depending primarily on the nature of the bottom material and the dredging method. (The cutter head dredge vacuums most if not all of the disturbed sand and silt into the pipeline while, by comparison, the hopper dredge would result in higher turbidity in the water in the borrow area.) Sand delivered to the project site via pipeline must remain suspended in water for transport. When the sand is deposited on the beach, the excess water, with suspended particulate matter, will drain off and return to the Gulf of Mexico. Even if hopper dredges are used, and if material is deposited on the project site other than via pipeline, some of the material will be deposited in the littoral zone, and some material deposited landward of the waterline will be inundated by the tides and wave action and potentially re-suspended in water in the littoral zone. If the water is turbid upon discharge in the littoral zone, the near-shore can become more turbid. Sand Quality The primary determinant of the amount and duration of turbidity generated in the borrow area and in the littoral zone of the project site is the quality of the bottom material in the chosen borrow area. The coarser the material, the less turbidity. The best quality bottom material usually is found in the kind of borrow area proposed for use in the Application. Sand in the borrow area came from some of Florida's finest beaches. It has been cleaned of fine material (silt) not only by wave action but also as the sand moved along shore in the littoral zone and by the currents in the East Pass inlet. Numerous tests of the bottom material in the proposed ebb shoal borrow for the project indicate that it generally has less than one percent silt. Expert witnesses for the City, County, and DEP testified that, with such low silt content, turbidity increases of no more than 5-10 Nephalometric Turbidity Units (NTUs) above background levels are expected at the edge of the mixing zone--150 meters down- current from the borrow area, and down-current and offshore from the discharge points on the beach. Moreover, they testified that turbidity levels are expected to return to background levels quickly (i.e., within an hour or so.) SOB and STBR questioned whether the experts could be certain of their testimony based on the test results. But SOB and STBR called no expert to contradict the testimony, and it is found that the expert testimony was persuasive. Standard Mixing Zone Initially, the City and County applied for a variance from the turbidity standards to allow them to exceed 29 NTUs more than 150 but less than 1660 meters down-current from the borrow area, and down-current and offshore from the discharge points, based on Attachment H, the Water Quality Impact analysis in the Application. The analysis was based on an assumption of five percent silt content in the bottom material in the borrow area. SOB and STBR attempted to use the five percent assumption to impeach the expert testimony on water quality. But when the quality of the bottom material was ascertained to be less than one percent, the variance request was withdrawn at DEP's request as being unnecessary and therefore inappropriate. SOB and STBR also argued in their PRO that, if a 1660-meter mixing zone was needed for five percent fines, then a 332-meter mixing zone would be needed for one percent fines. This argument was based entirely on counsel's arithmetic extrapolation. There was no evidence in the record from which to ascertain the validity of the extrapolation. In addition, the evidence was that the bottom material in the borrow area in this case will be less than one percent fines. Shore-Parallel Sand Dike Specific Condition 6 of the Draft Permit requires the permittee to "construct and maintain a shore-parallel sand dike at the beach placement area at all times during hydraulic discharge on the beach to meet turbidity standards prescribed by this permit." The shore-parallel sand dike is essentially a wall of sand built parallel to the shoreline to keep the sand slurry (the mixture of sand and water) being pumped onto the beach from washing back in the water, thereby giving the materials more time to settle out of the water before the water returns to the Gulf of Mexico. Even if this condition were not in the Draft Permit, the City and County would be required to build the dike since it is part of their design for construction of the Project. Turbidity Monitoring The Application included a proposal to monitor turbidity, and the Draft Permit includes the proposed monitoring as a Specific Condition 38. Every six hours during dredging and pumping operations, the City and County are required to sample 150 meters down-current of the borrow area, and down-current and offshore of the discharge point, and report the results to DEP within a week. In addition, Specific Condition 38 requires work to stop if turbidity standards are exceeded, which must be reported immediately. Work may not proceed "until corrective measures have been taken and turbidity has returned to acceptable levels." If more than one exceedence of the turbidity standard is reported, DEP will require the City and County to redesign the project to address and cure the problem. These conditions are part of the reasonable assurance that water quality standards will not be violated. Sediment Quality Control/Quality Assurance Plan Pursuant to Special Condition 4.b. of the Draft Permit, the City and County are required to do a Sediment Quality Control/Quality Assurance Plan, which requires them to measure the quality of the sand as it comes out of the pipeline before it can cause a turbidity problem. If the dredge hits pockets of bad material, which is not expected in this case, work could be stopped before it creates a turbidity problem. Absence of Natural Resources in Project Area DEP performed side-scan sonar tests in the vicinity of both the borrow site and near-shore in the Project area and determined that there were no hard bottoms or seagrasses in either area. Therefore, there are no natural resources within the project area that would be covered or placed in jeopardy by a turbidity plume. Reasonable Assurance Given For all of these reasons, the City and County have provided reasonable assurance that water quality standards will not be violated. Required Riparian Interest Generally, and in the beach nourishment project area, the BOT owns seaward of the mean high water line (MHWL). The City and County own some but not all of the beachfront landward of the MHWL.3 In anticipation of the beach nourishment project, the City and County had the MHWL surveyed as of September 7, 2003.4 The surveys state that the MHWL as of that date shall also be known as the ECL. The surveys also depict the landward and seaward limits of construction and the predicted post-construction MHWL. The surveys indicate that construction is planned to take place both landward and seaward of the ECL. The predicted post-construction MHWL is seaward of the ECL. By resolution, the BOT approved the surveys and established the ECLs for the Project. The City survey was approved, and ECL established, on December 30, 2004; the County survey was approved, and ECL established, on January 25, 2005. The BOT's decisions are being challenged in court. If the decisions are upheld, the BOT intends to file its resolutions and record the surveys. There was no evidence that the City and County have an easement or the consent of all of the other beachfront owners to undertake the proposed beach nourishment project. Some of the other beachfront owners do not consent, including members of SOB and STBR. Standing SOB was incorporated not-for-profit in Florida on January 28, 2004. STBR was incorporated not-for-profit in Florida on February 16, 2004. Both were incorporated to protect and defend the natural resources of the beaches, protect private property rights, and seek redress of past, present, and future unauthorized and/or inappropriate beach restoration activities. No evidence was presented by any party as to whether SOB and STBR have filed their annual reports with the Department of State, and no party filed a Department of State certificate of status as to either SOB or STBR. STBR has six members, all owners of beachfront property in the area of the proposed beach nourishment project.5 SOB has approximately 150 members. These members own approximately 112 properties in the City, approximately 62 of which are beachfront and the rest condominium units of beachfront condominium developments. However, it is not clear from the evidence how many of these beachfront properties are in the area of the proposed beach nourishment project (beyond the four owned by Linda Cherry, who testified). The testimony of Slade Lindsey was sufficient, together with member affidavits, to prove that all six members of STBR use the beaches and waters of the Gulf of Mexico adjacent to the Project area for swimming, fishing, boating, and/or enjoying beach and Gulf vistas. As a result, the construction of the Project will affect their interests at least during the time construction is taking place near their property. If the Project were to result in violations of water quality standards for turbidity, their interests would be affected as long as the violations lasted and perhaps longer if lasting damage to natural resources were to result. However, as found, there will not be any lasting damage to natural resources, and reasonable assurance was given that no water quality violations will occur and that exceedences of water quality standards in the mixing zone will be of short duration, lasting for no longer than an hour. These effects will not be substantial. The evidence was not sufficient to prove that construction of the Project will affect the interests of a substantial number of the members of SOB. First, it was not clear how many of them own beachfront property or even condominium units in developments adjacent to the Project area. Second, the only witness on the subject, Linda Cherry, does not know all of SOB's members and did not state how many of the 39 SOB members who signed affidavits as to their use of the beaches and waters of the Gulf of Mexico adjacent to the Project area are known to the witness. Even if a substantial number would be affected, their interests would be affected no more than the STBR members' interests.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that DEP enter a final order issuing Draft Permit DEP JCP File No. 0218419-001-JC. DONE AND ENTERED this 30th day of June, 2005, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 2005.

Florida Laws (19) 120.569120.57161.041161.088161.141161.161161.181161.191161.201161.211161.212253.03253.141253.77373.414403.031403.412617.0128617.1622
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer