CONSTRUCTION INDUSTRY LICENSING BOARD vs. RICHARD S. MCELROY, 84-004158 (1984)
Division of Administrative Hearings, Florida Number: 84-004158 Latest Update: Nov. 08, 1985

Findings Of Fact At all times material hereto Respondent was a registered roofing contractor with license number RC-0021643 and was acting as the qualifying agent for Poe Roof Company, Inc. The City of Coral Gables has adopted the South Florida Building Code which requires that a contractor obtain a building permit prior to commencing roof construction or repair. However, no permits is required when such work does not exceed $300 in value. If a roofing contractor fails to apply for a building permit the City is unable to conduct required inspections and is unaware of ongoing construction unless it is discovered by the City's code enforcement section. A Notice of Violation is issued when unpermitted construction activity is discovered, and the contractor is asked to "dry the roof in" to avoid the possibility of damage due to bad weather. All work is then stopped and the contractor must apply for a permit. On July 28, 1983 Poe Roof Company, Inc., submitted a proposal to reroof St. Mark's Lutheran Church which was accepted in March 1984 and work was begun. Construction was completed in June, 1984. Respondent did not apply for a permit for this job prior to the work commencing, and therefore required inspections were not made by the City. Respondent subsequently did apply for a permit on June 4, 1984. When a complaint from the church was received by the City about the work being performed, the City required Respondent to cut a "roof plug" so that it could be determined if the roof was being properly installed. No defects in the roof installation were discovered. The Church's representative had complained that Respondent did not properly supervise the installation and that the wrong roof tiles were used. The evidence presented does not establish that the wrong tiles were used, but it is evident that Respondent visited the job site infrequently, if at all. An investigator for the Department of Professional Regulation interviewed Respondent on July 5, 1984 and testified that Respondent admitted that he had never visited the job but simply supervised the reroofing from his office. The City of Coral Gables issued Notices of Violation against Poe Roof Company, Inc. on May 2, May 21 and July 11, 1984 for performing other roof work and repairs without the required permit. In these instances the value of each job exceeded $300, Respondent had not applied for a permit prior to the issuance of the Notice of Violation, and he was therefore assessed a double fee when he did submit applications on June 4, 1984 for the jobs associated with the Notices issued on May 2 and 21. He was also assessed a $100 fine by the City as a result of the Notice of Violation issued on July 11, 1984 for which he subsequently applied for a permit on September 26, 1984. In November, 1983 Respondent submitted a change of status application to the Construction Industry Licensing Board to change his license from inactive to active. Although he was designated as the applicants the license number for Roger Miller, owner of Poe Roof Company was shown on the application as well as on the check that accompanied the application. As a result of this error, Respondent's license was not changed to active status until July 9, 1984 when he was issued a 60 day temporary license to serve as qualifier for Poe Roof Company. Thus, when the work at St. Mark's Lutheran Church was taking place and two Notices of Violation were being issued on May 2 and 21, Respondent did not have an active license. His license was inactive when he subsequently applied for permits for these three jobs on June 4, 1984. Respondent knew his license was inactive since in defense he contends the City would not have issued permits to him if he had timely applied for them because he did not have an active license. The parties were given an opportunity to submit posthearing proposed findings of fact pursuant to Section 120.57(1)(b)4., F.S. A ruling on each proposed finding of fact has been made either directly or indirectly in this Recommended Order, except where such proposed findings of fact have been rejected as subordinate, cumulative immaterial or unnecessary.

Recommendation Based upon the foregoing findings of fact and conclusions of law it is recommended that a Final Order issue imposing an administrative fine of $750 against Respondent. DONE and ENTERED this 10th day of June, 1985 at Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 10th day of June, 1985. COPIES FURNISHED: W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Bruce M. Cease, Esquire 2720 West Flagler Street Miami, Florida 33135 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (4) 120.57489.115489.119489.129
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DOROTHY HOMESLEY, 87-002672 (1987)
Division of Administrative Hearings, Florida Number: 87-002672 Latest Update: Dec. 01, 1987

The Issue This is a license discipline case in which the Petitioner seeks to take disciplinary action against the Respondent on the basis of alleged violations of Chapter 489, Florida Statutes, set forth in an Administrative Complaint signed May 19, 1987. At the hearing the Respondent stipulated to several of the allegations in the Administrative Complaint. Thereafter, the Petitioner presented the testimony of four witnesses and offered five exhibits, all of which were received in evidence. The Respondent did not testify on her own behalf, but did present the testimony of one witness. The Respondent did not offer any exhibits in evidence. At the conclusion of the hearing the parties were given 20 days from the date of the filing of the transcript within which to file their proposed recommended orders. The transcript was filed on October 15, 1987, and the Petitioner thereafter filed a timely proposed recommended order containing proposed findings of fact and conclusions of law. As of the date of this recommended order, the Respondent has not filed a proposed recommended order nor any other document containing proposed findings of fact. Specific rulings on all proposed findings of fact submitted by the Petitioner are contained in the Appendix which is attached to and incorporated into this recommended order.

Findings Of Fact Based on the stipulations of the parties, on the exhibits received in evidence, and on the sworn testimony of the witnesses at the hearing I make the following findings of fact. Stipulated findings At all times relevant hereto, the Respondent was licensed by the Construction Industry Licensing Board as a registered roofing contractor. At all times relevant hereto, the Respondent held license number RC 0060128 issued by said Board. The Respondent's address of record is in Jacksonville, Florida. The Respondent did, through the contracting business Respondent was then associated with and responsible for in her capacity as a licensed contractor, contract with Darryl Debow, hereinafter referred to as the "Customer," to perform certain contracting work for the Customer. The details of the contracted work were generally as follows. The contract was entered into on or about April of 1986. The contract price was $5,900.00. The job was located in St. Augustine, Florida. The job generally consisted of repairing the roof of the Customer's commercial buildings. After entering into the contract, the Respondent's contracting business began work on the job. The rest of the facts The Respondent's business began work on the job described above without obtaining a permit for said work from the local building department and without assuring that someone else had obtained a permit for the work. There was no permit posted on the job site when Respondent's business began the job. The Respondent did not ask the local building department to inspect the work done on the subject contract. The Respondent was not licensed as a roofing contractor in St. Johns County, Florida, at any time from the beginning of 1985 until the day of the hearing. At all times material to this case, the applicable building code required permits for roofing work.

Recommendation On the basis of all of the foregoing, it is recommended that the Construction Industry Licensing Board issue a final order in this case to the following effect: Dismissing the violations charged in subparagraphs (b) and (c), of paragraph 13 of the Administrative Complaint; Finding the Respondent guilty of the violations charged in subparagraphs (a) and (d) of paragraph 13 of the Administrative Complaint; and Imposing an administrative fine in the amount of five hundred dollars ($500.00) and placing the Respondent on probation for a period of one year. DONE AND ENTERED this 1st day of December, 1987, at Tallahassee, Florida. MICHAEL M. PARRISH, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of December, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-2672 The following are my specific rulings on all proposed findings of fact submitted by the parties. Findings proposed by Petitioner: Paragraph 1: This paragraph is a proposed conclusion of law rather than a proposed finding. Paragraphs 2 through 7: Accepted. Paragraph 8: Accepted in part and rejected in part. Accepted that no inspection by the local building department was requested. Portion which states such inspections were required is rejected as not supported by clear and convincing evidence. Paragraph 9: Rejected as addressing matters which are not clearly placed in issue by the Administrative Complaint and which, in any event, are not supported by clear and convincing evidence. Paragraph 10: Rejected as not supported by clear and convincing evidence. Findings proposed by Respondent: The Respondent did not submit any proposed findings of fact. COPIES FURNISHED: Ms. Dorothy Homesley 35 Norde Drive, West Number 18 Jacksonville, Florida 32224 G. Vincent Soto, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Mr. Tom Gallagher Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Mr. Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201

Florida Laws (5) 120.57489.105489.117489.119489.129
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID L. NORRIS, 88-000275 (1988)
Division of Administrative Hearings, Florida Number: 88-000275 Latest Update: Sep. 30, 1988

Findings Of Fact The foregoing findings of fact 1, 2, and 3 are incorporated herein by reference as if fully set forth anew. On January 8, 1987, the Respondent was found guilty of violating Sections 489.129(2), 489.129(3), and 489.129(1)(g) Florida Statutes, by the Construction Industry Licensing Board in DPR Case No. 60987, DOAH Case No. 88- 0002. The Respondent was not present at that Board meeting. He asserted this was due to lack of timely notice of the Board's meeting. Respondent was fined $1,000 by the Final Order of the aforementioned Board filed/served on February 20, 1987. The Respondent has failed to pay the fine. Respondent has not appealed the final order or fine. Respondent expressed himself at formal hearing as intending never to pay the lawfully imposed fine.

Conclusions The foregoing Conclusion of Law 14 is adopted and incorporated herein as if fully set forth anew. Respondent is charged with gross negligence, incompetence or misconduct in the practice of contracting pursuant to Section 489.129(1)(m), Florida Statutes, for failure to pay his $1,000 fine pursuant to the Board's February 20, 1987 final order. However, Petitioner has cited no statutory or rule authority which labels a licensee's refusal to pay a fine or obey a final order of the Construction Industry Licensing Board as gross negligence, incompetence, or misconduct in the practice of contracting. (Emphasis supplied, see definition of "contracting" at Section 489.105, Florida Statutes). Without such authority, the factual allegations of the administrative complaint, although proved, support no conclusion that a statute or rule has been violated. Petitioner's recourse lies not in this forum but in enforcement, execution, and collection actions in Circuit court.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: The Construction Industry Licensing Board enter its final order dismissing the charge of a violation of Section 489.129(1)(m). DONE and RECOMMENDED this 30th day of September, 1988, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of September, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 88-0275, 88-0732 The following constitute rulings pursuant to Section 120.59(2), Florida Statutes, upon the parties' respective Proposed Findings of Fact (PFOF). DOAH CASE NO. 88-0275 Petitioner's PFOF have been accepted with certain modifications for greater clarity and to conform to the record as a whole. Respondent's Closing Statement is accepted in part in FOF 9. The remainder is rejected as mere argument or as based upon hearsay not properly in the record. DOAH CASE NO. 88-0732 Petitioner's PFOF have been accepted with certain modifications for greater clarity and to conform to the record as a whole. Respondent's Closing Statement is mere legal argument addressing the underlying facts of the previous final order finding Respondent guilty of certain violations and assessing a $1,000 fine. Absent a timely appeal, these matters are immaterial and rejected. These proposals are also rejected as mere argument. COPIES FURNISHED: Fred Seely, Executive Director Construction industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 G. W. Harrell, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 David L. Norris 3144 Northwest 39th Court Lauderdale Lakes, Florida 33309 Bruce D. Lamb, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (4) 120.57489.105489.119489.129
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID COBB, 79-002403 (1979)
Division of Administrative Hearings, Florida Number: 79-002403 Latest Update: May 30, 1980

The Issue Whether the Respondent willfully violated local building codes and abandoned a job.

Findings Of Fact David Cobb is a registered general and registered roofing contractor with the Florida Construction Industry Licensing Board. The job in question was done in Gainesville, Florida. Gainesville has a local building code, having adopted the Southern Standard Building Code, but does not have a local competing board. Cobb entered into a contract with John Larramore for a room addition to Larramore's home. Larramore paid Cobb a total of $2,475.84 on the job which was priced as $4,080.24, an amount which included the price of floor covering which both parties acknowledged would be purchased by Larramore and deducted from the monies paid Cobb. Cobb began work on the project. Larramore was not happy with the craftsmanship on the job, which was overseen by Cobb's foreman. Eventually, Larramore contacted a friend who was a contractor. This friend indicated to Larramore that the job should be inspected by the building inspectors of Gainesville, and Larramore contacted the Building Department of Gainesville. Pending inspection by the Department, Larramore told Cobb to stop work until he was contacted again. The chief building official, Leslie Davis, inspected the Larramore job on May 4, 1979. He found several violations of the local building code. Davis was accompanied by the Board's investigator, Herman Cherry. Davis contacted Cobb and advised him to correct the code violations. Davis sent Cobb a letter on May 10, 1979, outlining the violations and giving Cobb 14 days to correct these violations. See Exhibit 5. Cobb tried to contact Larramore by telephone without success concerning correction and completion of the job. Eventually, Cobb wrote Larramore an undated letter, Exhibit 4, which was written after the inspection by Davis and Cherry on May 4, 1979. Larramore was uncertain of the date he received the letter but did acknowledge it was after the Davis/Cherry inspection. Larramore did not contact Cobb after he received Cobb's letter. Instead, he contracted with another contractor to complete the job. This contractor began work on May 17, 1979.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer recommends that the Florida Construction Industry Licensing Board take no action against David Cobb. DONE and ORDERED this 9th day of April, 1980, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Michael E. Egan, Esquire 217 South Adams Street Mr. David Cobb Post Office Box 1306 16146 James Couzens Freeway Tallahassee, Florida 32301 Detroit, Michigan 48221

# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE LONGINO, 87-000162 (1987)
Division of Administrative Hearings, Florida Number: 87-000162 Latest Update: Aug. 11, 1987

Findings Of Fact Findings of Fact 1-13 are made based upon the Stipulation of the parties filed on July 10, 1987. Respondent is, and was at all times material to the pending amended administrative complaint, a certified building contractor having been issued license number CB CAO9793 by the Florida Construction Industry Licensing Board. At all times material the pending amended administrative complaint Respondent's certified building contractor license (CB CAO9793) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending amended administrative complaint, a certified air conditioning contractor having been issued license number CA CO24348 by the Florida Construction Industry Licensing Board. At all times material to the pending amended administrative complaint, Respondent's certified air conditioning contractor license (CA CO24348) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending administrative complaint, a registered mechanical contractor having been issued license number PM 0031246 by the Florida Construction Industry Licensing Board. At all times material to the pending administrative complaint, Respondent's mechanical contractor license qualified "J. C. and Sons, Inc." with the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was Respondent the qualifying agent for "First City Contractors, Inc." as defined by Sections 489.105(4) and 489.119, Florida Statutes. At no time material to the pending amended administrative complaint was Charles L. Crowe registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was "First City Contractor's, Inc." registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. On or about January 23, 1986, Charles L. Crowe d/b/a First City Contractors, Inc., contracted with Steve Bell to construct a room addition at 3110 Carrevero Drive West, Jacksonville, Florida. The contract price was approximately $25,000. On or about March 10, 1986, the City of Jacksonville, Building and Zoning Inspection Division, issued building permit number 6196 to George E. Longino and Associates, Inc. The above referenced building permit was for the construction of a room addition at the residence of Steve Bell, 3110 Carrevero Drive West, Jacksonville, Florida. The following Findings of Fact are based upon the evidence introduced at formal hearing. In December, 1985, or January, 1986, Charles L. Crowe, sole owner of First City Contractors, Inc., approached Longino and asked him to become a partner in the business and to pull permits and be the qualifying agent for First City Contractors, Inc. Longino advised Crowe that he would not be interested in doing that until he had resolved certain pending problems with his licenses. Specifically, the Construction Industry Licensing Board had filed a disciplinary action against Respondent's licenses and that case had been heard and a Recommended Order entered on October 30, 1985. The Recommended Order was scheduled to be considered by the Construction Industry Licensing Board on January 9, 1986. Longino did agree to pull permits for any job on which he would be paid to supervise the construction. Longino did pull the permit and supervise the construction of a garage addition in Arlington, Jacksonville, Florida, for First City Contractors in January or February, 1986. On January 23, 1986, Charles L. Crowe, doing business as First City Contractors, Inc., entered into a contract with Steve Bell to construct a room addition to a residence located at 3110 Carrevero Drive, Jacksonville, Florida. The contract price was $25,000. Based upon the contract, Crowe asked Longino to use his license number to sign a permit application for the Bell job. Longino used a building permit application form which he had in his truck and filled in the pertinent information on the building permit application. Specifically, Longino filled in the name of the licensed contractor as "First City Contractors, Inc." and signed his name as the licensee with license number CB CA09793. Longino signed the building permit application on or about the last week of January, 1986. Financing was not secured for the Bell job until March, 1986. On March 10, 1986, Crowe used the permit application which had been previously signed by Longino and sent an employee of First City Contractors, Inc., Robert Cumpston, to secure a building permit from the City of Jacksonville for the Bell job. Specifically, permit number 6196 was issued based upon the permit application which had been previously signed by Longino. On February 19, 1986, the Construction Industry Licensing Board entered a Final Order suspending Longino's licenses. Longino received notice of the suspension on February 24, 1986, by certified mail. Longino advised Crowe that his licenses had been suspended within a few days following receipt of the Final Order. Despite the knowledge that Longino's licenses had been suspended, Crowe used the presigned building permit application to secure a building permit for the Bell job on March 10, 1986. Building permit number 6196 was issued to Longino's license number doing business as George E. Longino and Associates, Inc. The name of the business was changed from that which was stated on the building permit application because Longino was not a qualifying agent for First City Contractors, Inc. He was only a qualifying agent for George E. Longino and Associates, Inc. A permit could not be issued to First City Contractors, Inc. using Longino's license number. The Bell job was completed using permit number 6196. Longino did supervise that construction and was present at the site on a daily basis. Permit number 6196 was posted at the site. Despite Longino's statements that he did not know that the permit was issued to his license number, it is found that Longino knew or should have known that permit number 6196 was issued to his license number, doing business as George E. Longino and Associates, Inc. Longino did nothing to remedy the problem even though his licenses had been suspended.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Professional Regulation, Construction Industry Licensing Board, enter a Final Order suspending the licenses of George E. Longino for a period of one (1) year in addition to the previous suspension. DONE and ENTERED this 11th day of August, 1987, in Leon County, Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of August, 1987. COPIES FURNISHED: Van Poole, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely Executive Director Construction Industry Licensing Board Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 William Bruce Muench, Esquire 438 East Monroe Street Jacksonville, Florida 32201 =================================================================

Florida Laws (5) 120.57489.105489.119489.127489.129
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. MARK W. GELLING, 88-000562 (1988)
Division of Administrative Hearings, Florida Number: 88-000562 Latest Update: Jul. 28, 1988

Findings Of Fact At all times relevant, the Respondent was licensed by the Construction Industry Licensing Board as follows: License No(s): RC 0021957 Licensed as: Registered roofing contractor Address of record is in: New Port Richey, Florida A certain contracting job was undertaken as follows: Customer: Stella Domas Approximate contract date: 6-85 Approximate price: $600 Job location: New Port Richey, Florida Job generally consisted of: Repair roof of Customer's house Said job was undertaken by the contracting business Respondent was associated with and responsible for in his capacity as a licensee. Respondent proceeded without a timely permit having been issued, violating local law, either deliberately or through improper supervision, in violation of 489.129(1)(d), (m), (j) 489.119; and 489.105(4), Florida Statutes. Respondent proceeded without timely obtaining all required inspections, violating local law, either deliberately or through improper supervision, in violation of 489.129(1)(d), (m), (j); 489.119; 489.105(4), Florida Statutes. Respondent gave a guarantee on said job to the Customer, and thereafter failed to reasonably honor said guarantee, in violation of 489.129(1)(m), (j); 489.119; 489.105(4), Florida Statutes. Respondent performed said work in a substantially deficient manner, therefore, violating 489.129(1)(m). Respondent previously has been disciplined by the State Construction Board. STIPULATED DISPOSITION Based on the Stipulated Findings Of Fact and Conclusions Of Law, the parties agree to the following disposition of the Amended Administrative Complaint: The Respondent shall pay a $1500 fine, payable within 60 days from entry of a final order approving this stipulated disposition; and The Respondent's registered roofing contractor license number RC 0021957 shall be suspended for 60 days, beginning 60 days from the entry of a final order approving this stipulated disposition.

Recommendation It is recommended that the Construction Industry Licensing Board enter a final order approving and incorporating the settlement stipulation between the parties. RECOMMENDED 28th day of July, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of July, 1988. COPIES FURNISHED: Jack M. Larkin, Esquire 806 Jackson Street Tampa, Florida 33602 Lee Ellen Acevedo, Esquire 7716 Massachusetts Avenue New Port Richey, Florida 34653 Fred Seely, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (3) 489.105489.119489.129
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHN W. FARRALL, 89-003291 (1989)
Division of Administrative Hearings, Florida Number: 89-003291 Latest Update: Feb. 15, 1990

Findings Of Fact At all times material to these proceedings, Respondent Farrall was licensed as a certified general contractor in Florida, and held license number CG C040234. In addition, the Respondent was licensed as a certified roofing contractor and held license number CC C024398. Mr. Farrall was the qualifying agent for Sunmaster Roofing Company. On May 25, 1987, Sunmaster Roofing Company entered into a contract with Clarence A. Miller and Emily Miller to reroof their residence in Naples, Florida. After the project was completed, Mr. and Mr. Miller filed a complaint with the Collier County Contractors' Licensing Board on December 7, 1987. Essentially, the complaint alleged as follows: 1) that the contractor abandoned the job without adequately completing construction; 2) that the roof materials were incorrectly installed; 3) that the contractor failed to obtain a building permit; and 4) that the contractor failed to adequately perform the contract due to his failure to correct faulty workmanship on the job. On December 11, 1987, copies of the complaint and a notice of hearing was sent to Respondent Farrall by certified mail to two different addresses. The items were promptly received at both locations. On January 15, 1988, the Respondent acknowledged that he was personally aware of the hearing scheduled for January 20, 1988. The Respondent requested a continuance until after January 29, 1988, because he had to attend to urgent family matters which required his presence in Canada. A continuance was not granted, and the hearing proceeded as scheduled. The Respondent was aware that the hearing was not continued prior to his departure for Canada. On January 20, 1988, a hearing was held, and the local board received evidence regarding the Miller complaint. As a result of the hearing, the local board found that the Respondent violated specific county ordinances in the following manner: by abandoning the job without legal excuse; disregarding or violating the building code by failing to obtain a building permit; and by failing to make good, faulty workmanship obviously performed in evasion of performance of the contract. The Respondent was disciplined by the Collier County Contractors' Licensing Board on January 20, 1988. His permit privileges were suspended in Collier County until the contractor makes restitution and appears before the Board for reinstatement. The Respondent was given fifteen days to appeal the decision. The Respondent personally received a copy of the disposition of the hearing by certified mail on January 28, 1988. An appeal was not taken of the decision.

Recommendation Based upon the foregoing, it is recommended that the charges set forth in the Administrative Complaint against the Respondent, John W. Farrall, in Case No. 89-3291 be DISMISSED. RECOMMENDED this 15th day of February, 1990, in Tallahassee, Leon County, Florida. VERONICA E. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of February, 1990. APPENDIX TO RECOMMENDED ORDER, CASE NO. 89-3291 The proposed findings of fact set forth in Petitioner's proposed recommended order are addressed as follows: 1. Accepted. See HO #1. 2. Accepted. See HO #2. 3. Accepted. See HO #1 and #2 4. Accepted. See HO #8 and #9. 5. Accepted. See HO #8. Rejected. Irrelevant to the charges filed. Rejected. Irrelevant to the charges filed. The proposed findings of fact filed by the Respondent are addressed as follows: Accept the first two sentences. See HO #1. The rest of paragraph 1 is rejected as improper argument which is not based upon material evidence presented at hearing. Accepted. See HO #2. Rejected. The issue in this proceeding involves the discipline by the local government board and not the underlying facts upon which the board based its findings. Immaterial. 4. Rejected. Immaterial. See above. Rejected. Rejected. Rejected. Irrelevant. Irrelevant. Irrelevant. Rejected. Rejected. Irrelevant. Irrelevant. Rejected. Rejected. Rejected. Irrelevant. Irrelevant. Contrary to fact. See HO #6. Rejected. Rejected. Contrary to Irrelevant. fact. See HO #9. COPIES FURNISHED: Jack M. Larkin, Esquire 806 Jackson Street Tampa, Florida 33602 John W. Farrall 316-2 Tudor Drive Cape Coral, Florida 33904 Fred Seely, Executive Director Construction Industry Licensing Board 111 East Coastline Drive, Room 504 Jacksonville, Florida 32202 Kenneth E. Easley, Esquire General Counsel Department of Professional Regulation 1940 North Monroe, Suite 60 Tallahassee, Florida 32399-0792

Florida Laws (2) 120.57489.129
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. ROBERT W. KIRK, 82-001854 (1982)
Division of Administrative Hearings, Florida Number: 82-001854 Latest Update: Dec. 04, 1990

The Issue The ultimate issues to be resolved in this proceeding are whether the Respondent has committed violations of statutes relating to licensed contractors and, if so, the appropriate penalty that should be imposed. The Administrative Complaint is in six counts. The first five counts basically allege that the Respondent aided and abetted unlicensed persons to practice contracting by allowing these persons to use his license in order to obtain building permits to do roofing work. In Count Six, it is charged that the Respondent has engaged in continuing acts of misconduct. At the hearing, the Department dismissed allegations that the Respondent violated provisions of local building codes. The Respondent denies all of the allegations.

Findings Of Fact The Respondent has been certified by the Construction Industry Licensing Board as a general contractor (License No. CG C011050) and as a roofing contractor (License No. CC C001794). The Respondent also holds a real estate broker's license and a mortgage broker's license. The Respondent has developed apartment complexes, and housing and business developments. The Respondent is not presently active in roofing contracting, but he was during the period from 1979 through 1981. Be has been in business in Florida since 1967. The Respondent had qualified Kirk, Inc., with the Construction Industry Licensing Board to do general and roofing contracting. The Respondent is president of Kirk, Inc. The Respondent did not qualify any other entities to do contracting work under either of his licenses during the times material to this proceeding. For approximately eighteen months during 1979 and 1980, the Respondent had a business relationship with Edward G. Tindall. Tindall had worked for the Respondent'5 father and was having financial difficulties. Tindall had some experience in the roofing business, and the Respondent sought to use Tindall to manage Respondent's roofing contracting business. Tindall was to be paid a supervisory rate plus other fees. Tindall was to solicit roofing jobs; enter into contracts with customers on behalf of Kirk, Inc.; and perform the roofing jobs. Tindall was not licensed in any capacity by the Construction Industry Licensing Board, and he was therefore not authorized to obtain building permits from the City of Titusville, where most of the jobs were located. Tindall did not perform work in accordance with the agreement with Respondent. Instead, Tindall had stationery and business cards printed which were labeled "Tindall Roofing Company, a division of Kirk, Inc." When Tindall got a roofing job, he did not reduce it to contract on a Kirk, Inc., form as he was supposed to do. Rather, he operated on the basis of oral contracts. He advised personnel at Kirk, Inc., who were qualified to obtain building permits, that he had obtained the jobs, and building permits were secured. Thereafter, Tindall would typically tell Kirk, Inc., employees that the job had fallen through. In the meantime, Tindall completed the work, often using Kirk, Inc., equipment, supplies and workers, and kept the proceeds for himself. The Respondent did not become aware of Tindall's activities until sometime late in 1980. When he learned what Tindall was doing, the Respondent fired Tindall and another employee. In August, 1979, Tindall contracted to repair a roof at the Florida Power and Light Building in Titusville, Florida. Be advised Kirk, Inc., of the contract, and the qualified person at Kirk, Inc., obtained a permit from the City of Titusville to complete the work. Tindall then advised that the project had been cancelled and completed the work himself. The roof was not completed in accordance with Tindall's agreement with Florida Power and Light and was constructed in a manner contrary to the City of Titusville building code. The Respondent was unaware that this had occurred until sometime late in 1980. During September, 1979, Tindall contracted with Donald Klongerbo to reroof Klongerbo's home in Titusville, Florida. Tindall obtained a building permit by utilizing Kirk, Inc., employees, then advised that the contract had fallen through. Tindall then completed the work himself. The Respondent did not know that this had occurred until sometime late in 1980. During approximately October, 1979, Tindall contracted to repair a roof on a warehouse in Titusville, Florida, that was owned by B. S. Brown. The Respondent authorized Tindall to obtain a building permit from the City of Titusville for this one project in accordance with the City of Titusville code. Tindall then advised that the contract had fallen through and completed the work himself. The work was completed in a substandard manner, and the roof leaked. The Respondent did not learn that this had occurred until sometime late in 1980. He endeavored to repair the poor work that Tindall had performed. During June, 1980, Tindall contracted to repair the roof on a residence owned by Gwen O. Mills in Titusville, Florida. Tindall obtained a building permit from the City of Titusville by utilizing personnel at Kirk, Inc. After obtaining the permit, Tindall advised that the contract had fallen through and completed the work himself. The work was completed in a substandard manner and eventually needed to be completely redone. Respondent did not learn of this incident until late in 1980. During the investigation of this matter, Tindall gave a written statement which was reduced to writing and which he signed. The statement supports the version of the facts alleged in the Administrative Complaint. At the final hearing, Tindall gave testimony consistent with that version of the facts. On two other occasions, Tindall signed affidavits to a totally different effect. In one of them, he admitted that he obtained the building permits by making untrue statements to the Respondent and other personnel at Kirk, Inc. At the hearing, Tindall gave testimony which supports this version of the facts. In evaluating Tindall's testimony, due regard has been given to the conflicting affidavits that he signed, to the conflicting testimony that he gave at the hearing, and to his demeanor as a witness. It has been concluded that his testimony is utterly incredible and not worthy of being believed. During May, 1981, Vernon Crosby, who did business as Crosby Painting and Decorating, was performing work at an apartment complex owned by Hewitt Properties, Inc. The apartments are located in Titusville, Florida. Roofing repairs were necessary for several of the buildings. Crosby talked with David Lawhorn, an experienced roofing worker, about the project and, based on that discussion, gave an estimate of the expense to Hewitt Properties. Crosby was asked to perform the work. He hired Lawhorn to accomplish it. Neither Crosby nor Lawhorn is a licensed contractor, and neither was authorized to obtain building permits from the City of Titusville. Lawhorn commenced work without obtaining a permit. Upon learning that work was being undertaken without a permit, personnel of the City of Titusville promptly and properly stopped the work from proceeding further. After work was stopped by the City, Crosby contacted the Respondent about the problem. The Respondent agreed to obtain a building permit for the work. The permit was obtained, and Lawhorn completed the work as he had agreed with Crosby to do. The Respondent was never in contact with Lawhorn about this project. Lawhorn's work was not supervised either by the Respondent or by Crosby. The only input that the Respondent gave to the project was obtaining the building permit. Due to ambiguities in the testimony, it is impossible to glean how much the Respondent was paid, but it is apparent that he was compensated and that he did nothing to earn compensation except obtain a building permit. The Respondent testified that he considered Crosby the agent of the apartment owner. Be testified that he viewed himself as the contractor and Crosby as his super visor. He testified that Crosby was to supervise Lawhorn's work on Respondent's behalf. This version of the relationship has not been credited because it is not supported by she testimony of either Crosby or Lawhorn. Crosby and the Respondent had had business dealings in the past, and it appears that the Respondent obtained the permit in part as a helpful gesture to Crosby. It does not appear that the Respondent ever anticipated performing a roofing job at the apartment far complex. His motivation, instead, was to obtain a building permit to allow persons who could not otherwise obtain a permit (Crosby and Lawhorn) to perform the work. There is insufficient evidence to support a finding that the Respondent has been guilty of any continuing course of misconduct in the practice of contracting. The only misconduct that has been established is in connection with the obtaining of a single building permit.

Florida Laws (2) 489.119489.129