Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
THEODORE B. MEADOW vs. DEPARTMENT OF NATURAL RESOURCES, 80-000424 (1980)
Division of Administrative Hearings, Florida Number: 80-000424 Latest Update: Nov. 05, 1980

The Issue Whether a permit should be issued to Petitioner Theodore B. Meadow to construct a dwelling on the Gulf Coast of Florida as requested in his application filed with Respondent Department of Natural Resources.

Findings Of Fact Having considered the evidence and argument of counsel, the Hearing Officer finds: In July of 1979 Petitioner filed an application for a permit to build a duplex dwelling seaward of the coastal construction setback line on a parcel of land bounded by the theoretical extension seaward of the north/south boundary line of Ponce de Leon Street in Yon's Addition to Beacon Hill on St. Joe Beach, Florida. The parcel of land is 70 feet in width and approximately 175 feet in depth to the high-water line of the Gulf of Mexico and lies between State Road 30 (US Highway 98) and the Gulf of Mexico at St. Joe Beach in Gulf County, Florida. The application, Department of Natural Resources File #79-P-283, was filed pursuant to Rule 16B-25.05, Procedure to obtain variance; application, Florida Administrative Code, which had been promulgated under the authority of Sections 161.052, 161.053 and 370.021(1), Florida Statutes. Attached to the application was a copy of a deed to subject property to Albert H. Hinman dated December 12, 1977; an undated authorization from the owner of the property to Petitioner Meadow to apply for a variance and if granted to construct a building on the property; a survey of the property; a floor plan of the building with a typical wall section; and a topographical plat of the lot involved. In response to Rule 16B--25.05(1)(d): "Statements describing the proposed work or activity and specific reasons why the applicant feels the variance should be granted." Petitioner stated, in part, "...the reason that the permit should be granted is because applicant does not have sufficient space on property he is purchasing from A. H. Hinman to construct said building outside of the DNR Coastal Construction Control Line." The survey shows that 14 to 15 feet of the property lies landward of the Department of Natural Resources' setback line. At the time of the hearing no purchase had been made, but there is no dispute regarding the authorization of the owner to allow Petitioner to build if a variance is granted. After filing the application Petitioner consulted with the staff of the Department concerning the construction seaward of the setback line. The Chief Engineer of the permitting section of the Bureau of Beaches and Shores, who is responsible for accepting, evaluating and making recommendations for permits for construction, inspected the site of the proposed structure on October 11, 1979. He took a copy of the plans and specifications for the structure, a plot plan, and the engineering statement which accompanied the plans to review on the site. After the inspection he made a determination that the structure was appropriately designed for the hazard environment and located in such a position as to offer the least potential adverse impact to the beach in the area. Recent topographic changes, topographic data including that submitted by Petitioner, and other historical information was used to assess and evaluate the project. Thereafter, the engineer consulted with the Executive Director of the Respondent Department and gave a favorable recommendation in terms of minimal impact. The Executive Director determined that the structure was designed and located to have the minimum adverse impact on the beach, and that the structure was adequately designed to resist natural forces associated with a hundred-year storm surge (Transcript, pages 52-56). At the formal hearing the Executive Director stated that he based his recommendation for approval by the Executive Board on the precedence of previous action of the Executive Board and because he found that the Petitioner had his application in order. Petitioner Meadow has followed the guidelines of the administrative rules and submitted all required information. He has provided his reason for requesting a variance and believes the information furnished compels the Respondent Department to grant the waiver inasmuch as no modification was requested and he cannot build the structure he desires on the 14 to 15 feet of land he is authorized to use which lies landward of the 1975 setback line. The immediate area involved in this proceeding is relatively undeveloped beach property approximately one (1) mile in length at St. Joe Beach, Gulf County, Florida some twenty-nine (29) miles to Panama City and six (6) miles to Port St. Joe. The real property has been divided into fourteen (14) lots more or less similar to the lot on which Petitioner seeks to construct a duplex (Petitioner's Exhibit 2; Transcript, page 137). No structures except one multifamily dwelling have been constructed on any of the fourteen (14) lots. Most the construction along the nearby coastline was completed prior to March 21, 1975, the date the Respondent Department established a coastal setback line under the then applicable statutes and rules. Beacon Hill is a subdivision about a mile and a half from the subject area on the coastal western edge of Gulf County. The structures are close together, the majority of which were constructed prior to 1975 without a permit from the Respondent Department. Historically, the area would have had a similar topography and beach conditions to the subject area, but because of structures built on the beach vicinity the primary dune system has been eradicated, the beach is narrow in that vicinity, and there is virtually no vegetation (Transcript, pages 135-136). It has been found that any construction, particularly of a building, generally has an adverse impact on a beach dune system (Transcript, pages 149, 161). The "setback line" defined in the 1975 statutes and rules was established March 21, 1975 (Transcript, page 169). Thereafter, in 1978 the legislature amended Section 161.053, Florida Statutes, and ordered the Respondent Department to establish a "coastal construction control line" to replace the setback line, but said line has not yet been established, although at the hearing a member of Respondent's engineering staff stated that a study was in progress. Neither Petitioner Meadow nor Mr. Hinman, the owner of subject property, requested the Respondent Department to review the setback line or establish a coastal construction control line prior to filing of the application in 1979 for a variance of the 1975 setback line (transcript, page 93). "Setback line" and "coastal construction control line" are not synonymous. The setback line set a seaward line for construction, and the coastal construction control line defines the impact of a 100-year storm surge or other predictable weather condition (Transcript, page 179). An engineer on the Respondent Department's staff who qualified as an expert was of the opinion that the coastal construction control line, when established, would be landward of the setback line established in 1975 (Transcript, page 198). There have been two (2) hurricanes which have impacted the Gulf Coast since the setback line was established, one in September of 1975 and one in September of 1979. These storms had relatively little visual impact on the subject beach area except for erosion of the fore dune, but the storms substantially impacted the accretion of the coastline (Transcript, pages 189- 195). At the final hearing Ms. Sally Malone, a resident living one block from the proposed structure of Petitioner Meadow, protested the proposed construction on the beach and in general the removal of trees. The evidence shows she has a legitimate concern for the effect through erosion the construction might have on the beach near her home. Petitioner Meadow and the Respondent Department submitted proposed findings of fact and proposed recommended orders. These instruments were considered in the writing of this order. To the extent the proposed findings of fact have not been adopted in or are inconsistent with factual findings in this order, they have been specifically rejected as being irrelevant or not having been supported by the evidence.

Recommendation Upon consideration of the foregoing Findings of Fact and Conclusions of Law, it is recommended by the Hearing Officer that the application of Theodore B. Meadow for a waiver or variance be denied without prejudice to his refiling an application after the coastal construction control line is established as required by Section 161.053, Florida Statutes, supra. DONE and ORDERED this 5th day of November, 1980, in Tallahassee, Leon County, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the clerk of the Division of Administrative Hearings this 5th day of November, 1980. COPIES FURNISHED: Mark J. Proctor, Esquire Office of the General Counsel Department of Natural Resources 3900 Commonwealth Building Tallahassee, Florida 32303 Cecil G. Costin, Jr., Esquire 413 Williams Street Post Office Drawer 98 Port St. Joe, Florida 32456

Florida Laws (3) 120.57161.052161.053
# 1
NICHOLAS SASSO vs BOARD OF BUILDING CODE ADMINISTRATORS AND INSPECTORS, 04-001642 (2004)
Division of Administrative Hearings, Florida Filed:Tampa, Florida May 05, 2004 Number: 04-001642 Latest Update: Dec. 01, 2004

The Issue The issue is whether Respondent should grant Petitioner's application for licensure as a building inspector.

Findings Of Fact By Notice of Intent to Deny dated March 17, 2004 (Intent to Deny), Respondent notified Petitioner that it intended to deny Petitioner's application for licensure as a building inspector. Respondent alleges that Petitioner does not have five years of combined experience in the field of construction or a related field, building code inspection, or plans review corresponding to building inspection; and that Petitioner did not provide an affidavit for each separate period of work experience from an architect, engineer, contractor, or building code administrator who has knowledge of Petitioner's duties and responsibilities. Petitioner satisfies the requirements stated in the Intent to Deny as the grounds for denying Petitioner's application. Petitioner's testimony at the hearing was credible and persuasive. The affidavits admitted into evidence at the hearing, without objection, supplement Petitioner's testimony and show that Petitioner has the required five years' combined experience in building construction or a related field and that the experience specifically corresponds to building inspection. Respondent has previously licensed Petitioner as a Provisional Building Inspector, One and Two Family Dwelling Inspector, Coastal Construction Inspector, and Building Code Administrator. In order to obtain a Coastal Construction Inspector License, Petitioner must have five years' experience in the construction field or a related field.

Recommendation Based on the foregoing, it is RECOMMENDED that the Respondent enter a final order granting Petitioner license application. DONE AND ENTERED this 24th day of September, 2004, in Tallahassee, Leon County, Florida. S DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September, 2004. COPIES FURNISHED: Jeffrey D. Jones, Esquire Department of Legal Affairs The Capitol, Plaza Level 01 Tallahassee, Florida 32399-1050 Nicholas Sasso Post Office Box 233 Port Richey, Florida 34673 Honorable Tom Gallagher, Chief Financial Officer Department of Financial Services The Capitol, Plaza Level 11 Tallahassee, Florida 32399-0300 Pete Dunbar, General Counsel Department of Financial Services The Capitol, Plaza Level 11 Tallahassee, Florida 32399-0300

Florida Laws (2) 120.569120.57
# 4
PAUL LETO, RICHARD MEYER, AND BERTA ANDERES vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 94-007073 (1994)
Division of Administrative Hearings, Florida Filed:Hollywood, Florida Dec. 19, 1994 Number: 94-007073 Latest Update: Nov. 21, 1996

The Issue The issue for determination is whether Petitioners are eligible for a permit, pursuant to Section 161.053, Florida Statutes, for construction seaward of the Coastal Construction Control Line in Broward County, Florida.

Findings Of Fact On November 30, 1993, Vander Ploeg and Associates, Inc., on behalf of Paul Leto, Richard Meyer, and Berta Anderes (Petitioners) submitted an application to the Florida Department of Environmental Protection (Respondent) for a permit to perform construction on their property seaward of the Broward County Coastal Construction Control Line. Respondent deemed their application complete on April 18, 1994. Petitioners proposed construction will be seaward of the Coastal Construction Control Line. The proposed construction will occur on two adjacent lots in Broward County. Petitioner Leto is the owner of one of the lots described as Lot 19, Block 196, Hollywood Central Beach, Plat Book 4, Page 20, Public Records of Broward County. Petitioners Meyer and Anderes are the owners of the other lot described as Lot 20, Block 196, Hollywood Central Beach, Plat Book 4, Page 20, Public Records of Broward County. Petitioner Leto purchased his lot in September 1992 and Petitioners Meyer and Anderes purchased their lot in March 1993. The lots were platted in or around the 1920's. Both lots are seaward of the seasonal high water line, on a sandy beach with no frontal dune structure. They are bordered by the Atlantic Ocean on the eastern most side and by a roadway (Surf Road) which is immediately adjacent to the lots on the western most side and landward of the lots. Approximately 200 feet north of the lots is an existing structure and approximately 800 feet south of this first existing structure is another existing structure. Petitioners topographical survey, which was submitted to Respondent in December 1993, showed that Lots 19 and 20, each measured 40 feet in a shore parallel direction and 80 feet in a shore normal direction, i.e., perpendicular to the shoreline. The proposed structure will be located directly on the sandy beach. The City of Hollywood, Florida has granted Petitioners a variance. Further, the proposed construction complies with the rules, zoning regulations, and ordinances of the City of Hollywood. Petitioners' application requests a permit for the construction of a single-family residence on the lots, which will house two families. However, the proposed construction is for a duplex, not a single-family residence. Petitioners are willing, and agreeable, to changing the design of the proposed structure to comply with Respondent's specifications for a single- family residence. Additionally, the proposed construction includes a riprap which will also be located on the sandy beach. A riprap is typically used for protective armoring. No structure presently exists for the riprap to protect. Furthermore, the riprap proposed by Petitioners is not adequately designed as a coastal protection structure, and if the proposed single-family residence is modified in accordance with Respondent's specifications, the proposed modified single-family residence would not be eligible for coastal armoring. The riprap structure is not an integral part of the structural design. Petitioners are willing, and agreeable, to eliminating the riprap structure. No other issues exist as to the structural integrity of the design of the proposed project. The lots on which the proposed structure will be located are a part of the beach-dune system. The natural function of the beach provides protection to upland property. The lots on which the proposed structure will be located are subject to normal storm-induced erosion. Tide and wave forces will impact the proposed structure during storms of minor intensity, including five-year storms. The proposed structure will induce greater erosion on the lots as a result of scour due to the interaction of the storm waves and currents with the proposed structure. During the storm, the normal storm-induced erosion combined with the scour erosion will form a breach or depression in the subject property. In turn, the upland property will be exposed to greater tide and wave forces, increasing the risk of erosion and damage to the upland property. The subject lots and surrounding properties have been subjected to unnatural forces which have added to the erosion. The Port Everglades inlet has inhibited the natural downdrift of sand. The City of Hollywood's beach maintenance division has been regularly pushing sand seaward and in the process, breaking down natural forming cliffs. Even though these unnatural forces are capable of being eliminated, the normal storm-induced erosion and the scour erosion would still exists. The existing developed structures to the north and south of the subject lots appear to create a reasonably uniform line of construction. However, the developed structures have been unduly affected by erosion. The proposed structure will be located within this line of construction. During a major storm along the shoreline, waves remove sand from the beach and dune area and deposit the sand in an offshore bar. After the major storm, a recovery of the beach and dunes takes place. Normal wave activity carries the sand from the offshore bar back to the beach, and the sand is then carried landward by winds and is caught and trapped by dune vegetation; thereby reforming a dune. Constructing the structure as proposed will not locate the structure a sufficient distance landward of the beach-dune system. As a result, the proposed structure will interrupt natural fluctuation in the shoreline and not preserve the natural recovery following the storm-induced erosion. The cumulative impact on the beach-dune system by the proposed structure would be severe, i.e., the effects on the beach-dune system by repeating this same proposed structure along the subject shoreline would be severe. There would be structure-induced scour and general degradation of the beach-dune system. Additionally, the recovery potential of the subject area following a major storm event would be threatened. Over the years, the beach of the subject property has been subjected to a re-nourishment project consisting of pumping sand from offshore. This method of re-nourishment may have negatively impacted the sand bar system immediately offshore affecting the hindrance of erosion. A sand bar system immediately offshore softens wave action on the shore and aids in inhibiting erosion. The proposed structure will hinder lateral public beach access. Currently, lateral beach access exists along the beach between the existing northern developed property and the existing southern developed property. The proposed structure will be located on the sandy beach, and the seaward face of the proposed structure will be within approximately one foot of the wet sand beach. At times, the proposed structure will be surrounded by water on at least three sides. No alternative beach access would be available. The proposed riprap will also be located on the sandy beach and will further hinder lateral public beach access. 2/ Loggerhead turtles, which are nesting marine turtles, engage in nesting activities along the stretch of beach where the subject property is located. They are a threatened species, i. e., close to extension. Although they do not nest every year, the turtles usually provide several nests in a single year. Typically, one hundred eggs comprise a turtle nest. In 1992, approximately 2,221 loggerhead turtle nests were in Broward County, with 22 of these nests located within 1,000 feet of the subject property. Turtle nesting efforts have been observed in the beach area of the subject property. One nest was found within the subject property. Structures located on the sandy beach interfere with marine turtle nesting habits. If female turtles make contact with the structures, they often abort nesting attempts, which results in false crawls. Repetitive false crawls harms successful nesting, which may cause malformed egg chambers, impacting the successful incubation of the nest. Also, interaction with a structure can cause injury or death to a female turtle attempting to nest. Additionally, urbanization activity and lighting on the beach deter nesting. A loss of marine turtle nesting habitat will result if the proposed structure is constructed. Also, armoring, such as the proposed riprap, can result in nests being placed more seaward. 3/ Consequently, the nests would be threatened with tidal inundation, which would affect the mortality of the nest itself. As one nest has been located within the subject property, at least one nest or crawl per year would be affected by the proposed structure. Within 30 years, the proposed structure will be seaward of the seasonal high water line. The location of the proposed structure is seaward of the 30-year erosion projection for the subject property. Beach Defense Fund, Inc. (Intervenor) presented no evidence to show that its interest is different than the public at large and that it has substantial interest separate and apart from the public.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying the application of Paul Leto, Richard Meyer, and Berta Anderes for a permit, pursuant to Section 161.053, Florida Statutes, for construction seaward of the Coastal Construction Control Line in Broward County, Florida. DONE AND ENTERED this 31st day of May, 1996, in Tallahassee, Leon County, Florida. ERROL H. POWELL, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of May, 1996.

Florida Laws (4) 120.57120.66120.68161.053 Florida Administrative Code (5) 42-2.013162-312.02062B-26.01362B-33.00562B-33.007
# 6
AMERICAN COASTAL ENGINEERING, INC., ON BEHALF OF WILLIS H. DUPONT vs DEPARTMENT OF NATURAL RESOURCES, 91-005417 (1991)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 28, 1991 Number: 91-005417 Latest Update: Jan. 03, 1995

The Issue The issues for determination at final hearing were (1) whether Petitioner's coastal construction Permit No. 86-155PB, authorizing Petitioner to construct and temporarily maintain an experimental reef structure seaward of the DuPont residence in West Palm Beach, Palm Beach County, Florida, should be extended under Special Permit Condition 10 of the Permit and (2) whether the experimental reef structure should be removed pursuant to Special Permit Conditions 3 and 12 of the Permit.

Findings Of Fact On April 6, 1987, American Coastal Engineering, on behalf of Willis H. DuPont (Petitioner) and Florida Atlantic University's Department of Ocean Engineering, was granted coastal construction Permit NO. 86-155PB 3/ (Permit) by the Department of Natural Resources (Respondent). 4/ The Permit authorized Petitioner to construct and temporarily maintain an experimental reef structure seaward of the DuPont residence in West Palm Beach, Florida. The experimental reef structure, referred to as a prefabricated erosion prevention reef (PEP reef), is a 550 foot submerged breakwater which was constructed using prefabricated concrete segments, placed end-to-end underwater in the nearshore area. The purpose of the PEP reef is to reduce erosion of the beach landward of the structure. The PEP reef was installed on May 5, 1988. Special conditions were placed on the Permit, to which Petitioner agreed. The special conditions in pertinent part provide: The permittee shall adjust, alter or remove any structure or other physical evidence of the work or activity permitted, as directed by the Executive Director, if in the opinion of the Executive Director, the structure, work or activity in question results in damage to surrounding property or otherwise proves to be undersirable or becomes unnecessary. Adjustment, alteration, or removal required under this provision, shall be accomplished by the permittee at no cost to the State of Florida. * * * 10. The proposed submerged breakwater shall be removed within two years following installation of the experimental structure unless determined by the staff to remain in place for an extended period of time. This determination shall be based on a staff evaluation of the monitoring data, existing statutory regulations, and the feasibility of the project in concurrence with the beach management plan at that time. The experimental structure shall only remain in place after two years upon written approval from the Executive Director indicating an extension has been granted. * * * 12. The Executive Director may order removal of the experimental structure as soon as the shoreline along any portion of the area required to be nourished under Special Permit Condition 6 erodes up to or landward of the pre-nourished beach profile indicating a complete loss of the nourished beach material from that location and accretion at another location within the area to be monitored. Petitioner requested an extension of the Permit. On July 10, 1991, Respondent issued a final order denying an extension of the Permit, pursuant to Special Permit Condition 10, and directing the Petitioner to remove the PEP reef pursuant to Special Permit Conditions 3 and 12. An extension of the Permit beyond the two years following installation of the PEP reef, according to Special Permit Condition 10, is based upon three factors: (1) an evaluation by Respondent's staff of monitoring data gathered by Petitioner, (2) statutory regulations existing at the time of the extension request, and (3) the feasibility of the project in concurrence with the beach management plan existing at the time of the extension request. Although Petitioner's monitoring data addressed the question whether the PEP reef was performing its function, it did not address existing statutory regulations or the project's feasibility in concurrence with the current beach management plan. 5/ Petitioner's monitoring data was collected over a two-year period with surveys being performed through March 1990: March 1988 (preconstruction), May 1988 (post-construction), August 1988, December 1988, February 1989, April 1989, July 1989, November 1989, and March 1990. The data was collected along 17 profile stations: seven stations were located within or immediately adjacent to the boundaries of the PEP reef, and five to the north and five to the south of the PEP reef. The data indicated that the PEP reef was an experiment and approved by Respondent as an experiment. As a conclusion, Petitioner indicates that the PEP reef is functioning for the purpose it was designed in that it is providing a benefit to the beach. Respondent disagreed with Petitioner's conclusion. For one, Respondent disagreed with the method of analysis used by Petitioner to analyze the data because Petitioner's analysis failed to filter out seasonal effects. This procedure brought into play the first of the three factors in Special Permit Condition 10 which was used for denial of the Permit extension. Petitioner's monitoring data was utilized and analyzed by Respondent. Using the data gathered, Respondent created profile plots which are cross sectional depictions of the shoreline profiles and which displayed changes to the shoreline occurring during the survey period. Respondent used a shoreline change analysis in determining the PEP reef's effect on the shoreline in its vicinity. The analysis focused on the net change in the shoreline, i.e., the net change in the location of the mean high water line, factoring out the seasonal variations which occur along the coast by comparing profile plots from the same time of year taken during the two-year monitoring period. The shoreline change analysis indicated that in the vicinity of the PEP reef the shoreline showed irregular periods of both accretion and erosion. However, the shoreline did not reflect the typical pattern that was expected with a functioning breakwater. To the contrary, the irregular periods of accretion and erosion and the irregular configuration of the shoreline indicated that factors other than the PEP reef were affecting the shoreline. One such intervening factor was attributed to the large number of existing shoreline structures called groins which are scattered throughout the area. Groins are structures intended to stabilize the shoreline by blocking the down drift movement of sand, thereby altering the natural coastal processes. The monitoring data shows that, in terms of accretion or erosion, the PEP reef produced no recognizable influence on the shoreline in its vicinity. As to the second factor in Special Permit Condition 10, at the time the Permit was granted in 1988, no regulations specifically applicable to experimental structures existed. However, in 1989 a provision specifically addressing the permitting of experimental structures became law. /6 The provision provides that the "intent" of the Florida Legislature is to "encourage the development of new and innovative methods for dealing with the coastal shoreline erosion problem," and that, in authorizing the "construction of pilot projects using alternative coastal shoreline erosion control methods," the Respondent must determine, among other things, that "the proposed project site is properly suited for analysis of the results of the proposed activity." Groins in the PEP reef area alter the natural coastal processes and, therefore, play a significant role in the analysis of the shoreline processes. The effect of the groins affected the Respondent's ability to determine the effectiveness of the experimental structure. As a result, the Respondent was unable to make a determination in accordance with the legislative mandate. As to the third factor in Special Permit Condition 10, Petitioner presented no evidence addressing this factor. Petitioner has failed to show that the experimental structure, the PEP reef, has satisfied Special Permit Condition 10. It has failed to show that the intended purpose of the PEP reef has been accomplished, i.e., that the PEP reef is effective or beneficial. In denying Petitioner's request for an extension of the Permit, Respondent directed removal of the PEP reef pursuant to Special Permit Conditions 3 and 12. Special Permit Condition 3 provides for removal, alteration or adjustment of the PEP reef if it "proves to be undersirable or becomes unnecessary." The construction of the PEP reef consisted of, among other things, the placing of individual reef units end-to-end. To alert boaters to the location of the PEP reef, a buoy was placed at each end of the structure. The stability of the PEP reef is questionable. In 1989 a storm dislodged the individual units. In an effort to prevent sliding, Petitioner attempted to realign the units to their original position and added more weight to the units. Despite Petitioner's efforts to stabilize the structure, the PEP reef has experienced continued movement. Furthermore, because of the continued movement, boaters' safety would be compromised in that the buoys would be ineffective in warning them of the location of any units which may be dislodged. Also, the additional weight to the units could cause the individual units to settle, potentially affecting the performance of the PEP reef, and could induce erosional scour around the structure itself. Special Permit Condition 12 provides for removal when "the shoreline along any portion of the area required to be nourished . . . erodes up to or landward of the pre-nourished beach profile indicating a complete loss of the nourished beach material from that location and accretion at another location." The shoreline analysis showed that the shoreline in many portions of the nourished area eroded landward of the pre-nourished beach profile. The mean high water line had positioned landward of its pre-project location. Petitioner has failed to show that the PEP reef does not fall within the conditions of Special Permit Conditions 3 and 12. Federally protected and endangered marine species have attached themselves to and/or now reside in the PEP reef, complicating the removal of the PEP reef. In order not to disturb or disrupt this marine life, Respondent has expressed a desire in relocating the structure to a position further offshore.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Natural Resources 7/ enter a final order DENYING an extension of Permit No. 86-155PB. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 21st day of April 1994. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of April 1994.

Florida Laws (2) 120.57161.041
# 8
# 9
WOODHOLLY ASSOCIATES vs. CITY OF HOLLYWOOD AND DEPARTMENT OF NATURAL RESOURCES, 82-003234 (1982)
Division of Administrative Hearings, Florida Number: 82-003234 Latest Update: Oct. 25, 1983

Findings Of Fact On September 23, 1983, Hollywood submitted a permit application to DNR for construction of the proposed project which is the subject matter of this proceeding. DNR designated that permit application as Permit Application 50-41. The proposed project is actually the first phase of a two-phase project, Phase II of which has already been permitted by DNR. Phase I, which is the subject of Permit Application 50-41, consists of an extension of existing Surf Road in the City of Hollywood, an extension of an existing asphalt boardwalk, construction of a parking area with landscaped island, swale, and associated lighting. The excavated fill removed from the site of Phase I is to be used in the construction of a dune which is encompassed within Phase II of the project. The properties on which Phase I and Phase II are to be constructed are owned by the City of Hollywood and are located seaward of the Coastal Construction Control Line and landward of the Erosion Control Line. The Summit Condominium is a condominium development located west of South Surf Road in the City of Hollywood, and is directly adjacent and contiguous to the property upon which the aforementioned project is to be constructed. Petitioner is the builder and developer of the Summit Condominium and, in addition, is the fee simple owner of approximately 15 units in that development. Phase I of the proposed project, which is the permit application at issue in this proceeding, provides for the construction of a 121-space public parking area which will be approximately 62 feet wide and 605 feet long, and will extend approximately 95 feet seaward of the Coastal Construction Control Line. The parking lot will be constructed with a six-inch limerock base over a six-inch crushed limerock subbase, and will be surfaced with a one and one-half- inch asphalt wearing course. The parking lot is designed with a definite landward slope, so that stormwater will sheet flow across the parking lot away from the dune system. There is no evidence of record in this proceeding which would in any way justify a conclusion that stormwater runoff from the parking lot area will have any adverse effect on the dune system seaward of the lot. Stormwater runoff once it has left the parking lot surface will be collected in a swale and drainage ditch system located landward of the paved parking lot surface. The drainage ditch will be composed of sandy material presently located on the site and is designed on a 1.2 to 1 slope. In addition, Wedelia is to be planted in and around the drainage ditch system in order to stabilize the slopes of the ditch. The ditch and swale system is designed to allow most stormwater runoff to percolate into the soil, with any excess being collected in the ditch itself and transmitted in a northerly direction. A drainage calculation study prepared in conjunction with this proceeding demonstrates that the drainage capacity for the proposed ditch meets minimum standards contained in the South Florida Building Code, as applied by the City of Hollywood. As the ditch fills with stormwater, the water will flow in a northerly, shore parallel direction to Jefferson Street, which is located north of both the proposed project and the Summit Condominium. From Jefferson Street, runoff from the project site will flow westerly to Highway A-1-A where an existing stormwater sewer system is located. If for some reason that system proves insufficient to handle runoff, the runoff will then travel across A-1-A into the intracoastal waterway. There is no competent evidence of record in this proceeding to demonstrate that stormwater runoff from the project site will, under any conditions, flow onto Petitioner's property. Phase I of the project has been designed to minimize the potential for the creation of aerodynamically or hydrodynamically propelled missiles in the event of a major storm. The asphalt surface of the parking lot is designed to break into chunks which will settle into the sand or water when exposed to wind and water forces. The parking meters are set four feet into the ground which reduces their potential to act as missiles, but even should the beach recede to the point where the meters are installed, evidence of record in this proceeding establishes that they will fall to the base of the eroded dune wall and will be washed out to sea rather than be propelled shoreward either by water or air. Various storm surge computer models for pre- and post-construction conditions at various locations on the property were performed. The result of these models shows that there will be no difference in impact on the beach dine system and adjacent property between the pre- and postconstruction profiles in the event of a ten-year storm. Further, computer models actually showed that there will be less erosion for the post-construction profile than for the preconstruction profile in the event of a twenty-year storm surge. In the event of a fifty-year or greater storm event, the beach profile for both pre- and postconstruction in the project area would be inundated, so that the impact of such a storm will be the same with or without the proposed construction. Evidence of record does, however, establish that based upon postconstruction conditions as proposed in the permit application it would take a greater storm to erode material from the postconstruction profile, thereby establishing that the proposed project will afford greater protection than existing topography. It appears from the record in this proceeding that Hollywood's Permit Application 50-41 is complete, and that DNR has in its possession all information necessary and required by law for the processing of the permit application. Engineering plans submitted in support of the application for Phase T have been signed and sealed by a professional engineer registered in the State of Florida.

Recommendation RECOMMENDED That a Final Order be entered by the State of Florida, Department of Natural Resources, granting the requested permit. DONE AND ENTERED this 25th day of October, 1983, at Tallahassee, Florida. WILLIAM E. WILLIAMS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of October, 1983. COPIES FURNISHED: Steven L. Josias, Esquire Donald J. Dooty, Esquire 3040 East Commercial Boulevard Fort Lauderdale, Florida 33308 Deborah A. Getzoff, Esquire Assistant General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303 Leonard Lubart, Esquire Post Office Box 2207 Hollywood, Florida 33022 Elton J Gissendanner, Director Department of Natural Resources Executive Suite 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (2) 120.57161.053
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer