Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
CONSTRUCTION INDUSTRY LICENSING BOARD vs. CLARENCE S. TATE, 83-001305 (1983)
Division of Administrative Hearings, Florida Number: 83-001305 Latest Update: Jan. 31, 1984

Findings Of Fact At all times material here to, Respondent was licensed as a certified general contractor, having been issued license number CG C009484 by the State of Florida. At all times material hereto, Respondent qualified Allstate Roofing & Construction Company with the Florida Construction Industry Licensing Board. Since March 1983, Respondent has also been licensed as a registered roofing contractor and qualifies Allstate Roofing & Construction Company with the Florida Construction Industry Licensing Board under license number RC 0043155. On March 27, 1981, as the qualifier for Allstate Roofing & Construction Company, Respondent entered into a contract with Joe Hill to reroof Hill's home for the contract price of $2,214.10. The contract further provided that workmanship would be unconditionally guaranteed for a period of five years. Respondent in turn entered into a subcontract on April 8, 1981, whereby A & A Roofing Co. subcontracted with Allstate Roofing & Construction Company to perform the work required on the Hill roof for the sum of $1,950, which contract also carried a five-year workmanship unconditional guarantee. In the meantime, Hill and his wife obtained a second mortgage on their home to pay for the replacement of the existing roof, and the mortgage company paid Respondent directly. The subcontractor with whom Respondent contracted for the work on the Hill home was a registered roofing contractor. The existing roof on the Hill home was gravel. Under the contract for replacing the roof on the Hill hoine, asphalt shingles were installed on the portion of the roof which is slanted, and new gravel and tar were installed on the portion of the roof which is flat. After the roof was completely replaced, Hill contacted Respondent to report leaks in the flat part of the roof. In response to that complaint, someone came to the Hill residence and repaired the areas where leakage was reported. Since the roof leaked again, Hill contacted Respondent, and Mr. Davis of A & A Roofing Co. reported to the Hill residence and worked on the roof. In January 1983, Hill's wife contacted Respondent regarding her leaky roof, and once again someone was sent to the Hill residence to effectuate repairs. Although the Hills testified at the formal hearing that the roof still leaked, no evidence was presented to show the precise location of any leak in order o ascertain if the leak was a new" leak or an "old" leak. Both Mr. and Mrs. Hill do admit, however, that Respondent has responded to their complaints every time they have contacted him.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered finding Respondent not guilty of the allegations contained in the Administrative Complaint filed herein and further dismissing the Administrative Complaint against him. DONE and RECOMMENDED this 20th day of October, 1983, in Tallahassee, Leon County, Florida. LINDA M. RIGOT, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of October, 1983. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Clarence. S. Tate 8282 Westernway Circle, Suite 103 Jacksonville, Florida 32216 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202

Florida Laws (4) 120.57455.227489.113489.129
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. ARJAN D. CHANDWANI, 84-001298 (1984)
Division of Administrative Hearings, Florida Number: 84-001298 Latest Update: Dec. 04, 1990

The Issue The issue presented for decision herein is whether or not Respondent's certified general contractor's license should be revoked, suspended, or otherwise disciplined based on conduct set forth in two Administrative Complaints filed herein dated March 14 and July 19, 1984.

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, documentary evidence received and the entire record compiled herein, I hereby make the following relevant factual findings. At all times material hereto, Respondent was a certified general contractor in Florida and has been issued license number CGC 015834. 3/ (Petitioner's Exhibit 1) Petitioner is an agency of the State of Florida responsible for enforcing the provisions of Chapter 489, Florida Statutes, relating to the imposition of licensure standards and standards for the practice of contracting. During times material hereto, Respondent was a full-time employee of the Metropolitan Dade County Aviation Authority. At no time during his employment with the authority did Respondent advise the Dade County Aviation Authority that he was performing work outside the scope of his employment while on County time. When confronted with the results of an investigation undertaken by the Dade County Attorney's Office in June of 1983 with regard to his (Respondent's) possible violation of the Code of Metropolitan Dade County, Respondent resigned from his position with the County. (Tr. pages 101-102) DOAH CASE NO. 84-1298 During late February, 1983, Albert Kairy contracted with an unlicensed contractor for the closure of a carport at his residence located in North Miami, Florida. After observing Respondent's classified advertisement in a local flier, Kairy contacted Respondent with regard to preparing necessary blueprints for the enclosure. Kairy contracted with Respondent to prepare both the blueprints and to supervise the activities of the unlicensed contractor. The contract amount was $400. On February 25, 1983, Kairy received an owner/builder permit for the carport enclosure from the City of North Miami. (Tr. pages 7-10, 93) Subsequently, problems began to develop with work performed by the unlicensed contractor and Respondent persuaded Kairy to dismiss that individual and to retain him as the contractor. On March 7, 1983, Respondent entered into a contract with Kairy to construct a room addition to the residence. (Petitioner's Exhibit 2) The project was to be completed pursuant to plans and specifications approved by the City of North Miami. The contract called for a bedroom addition; an additional bathroom and a utility room. The contract included extending the carport wall approximately 101 feet. The contract price was $14,500 which included an advance of $2,500. On March 12, 1983, Respondent entered into a second construction contract with Kairy. (Petitioner's Exhibit 3, Tr. 19) The contract price was $15,000. Except for the increase in the contract price, Kairy was led to believe that the terms and conditions of the second contract were substantially similar to the contract previously executed by the parties on March 7, 1983. However, Respondent reduced the extension of the carport wall to 10 feet and Respondent did not inform Kairy of this reduction. (Tr. page 48) The contract called for draw payments as follows: $4,000 as a downpayment/advance; $3,000 upon completion of slab and block walls; $1,500 upon completion of piping and tie-columns; $2,500 upon completion of partition and drywall; $3,000 upon completion of the roof, and $1,000 upon completion of the job. (Petitioner's Exhibit 3) Respondent subsequently applied for a permit from the City of North Miami. The City of North Miami denied Respondent's application because Respondent failed to comply with the Dade County licensing requirements. (Tr. pages 21-22) Although Respondent acted in the capacity of a general contractor, he (Respondent) requested that Kairy obtain a owner/builder permit. Upon applying for the owner/builder permit, the City cancelled the original permit for the carport enclosure. (Tr. page 94) Kairy obtained the owner/builder permit pursuant to Respondent's assurances the permit would be properly transferred to Respondent's contracting license. The City provided Kairy with a "hold harmless letter" for Respondent to execute. (Petitioner's Exhibit 4) Upon presentation of that letter by Kairy to Respondent, Respondent refused to execute the "hold harmless letter." (Tr. pages 22-24) Subsequently, Kairy and Respondent executed an addendum to the construction contract. The addendum involved changing the enclosures roof structure from shingle to barrel tile. This change involved a price difference of $1,950 and increased the total contract price to $16,950. (Petitioner's Exhibit 5, Tr. pages 31-32) The addendum was executed after completion of the tie-beam and tie- column portion of the construction project. Pursuant to the terms and conditions of the March 12, 1983 construction contract, Kairy provided Respondent with the following amounts: $4,000 as an advance/downpayment on March 21, 1983; ($2,500 under the March 7 contract plus an additional $1,500); $3,000 upon completion of the slab and block work; $400 for preparation of the original set of plans; $500 toward tinted windows; $1,500 upon completion of the tie-beam and tie- column; $1,500 as an advance on the barrel tile roof; and $1,500 as an advance upon the completion of the roofs. (Petitioner's Exhibit 6) Kairy paid Respondent a total of $12,400 on the total contract price of $16,950 or approximately 73 percent of the contract price. Kairy timely remitted to Respondent installment payments for the slab and block work, tie- beam and tie-columns and advanced Respondent $3,000 towards completion of the roof. During April, 1983, Respondent commenced construction for enclosing the roof structure. Respondent ceased all construction activity upon being informed (by Kairy) that he would no longer pay Respondent in cash. (Tr. page 44) Respondent refused to accept payment in any form other than cash and offered no explanation, reason or excuse to Kairy for the cessation of work on this project. Kairy offered several reasons for his refusal to pay contract installments in cash. First, Respondent refused to execute the hold harmless letter provided by the City of North Miami and Respondent failed to properly supervise the construction activities by, among other things, disappearing from the project for a period of approximately three weeks. Finally, Respondent requested additional advances on the contract while the project was not progressing as scheduled. (Tr. pages 28, 44-46) Respondent did not return to the construction site after Kairy refused cash payments. On July 20, 1983, Respondent's roofing subcontractor filed a claim of lien against Kairy's property in the amount of $1,210. (Petitioner's Exhibit 8) Respondent has failed to satisfy the claim of lien and Kairy is in the process of satisfying that claim. (.Tr. page 54) Respondent also failed to pay an electrical subcontractor for services provided in the amount of $965. (Petitioner's Exhibit 7) Again, Kairy is currently in the process of satisfying that debt and Respondent refuses to honor that obligation. (Tr. 57) Kairy reimbursed the plumbing subcontractor in the amount of $675 after Respondent's personal check was returned due to insufficient funds. (Tr. page 62 and Petitioner's Exhibit 9) On April 1, 1983, the City of North Miami Building Department inspected the foundation and slab. On April 18, 1983, the Building Department inspected the tie-beam and columns. On May 6, 1983, the City of North Miami Building Department performed a tin-cap inspection on the enclosure roof. The City of North Miami Building Department estimated the actual construction completed when Respondent left the project and determined that it was approximately 70 percent complete. Completed construction included the slab, foundation, walls and tie-beam. Little interior construction work had been performed and drywall and partition walls were only partially complete. Kairy has either expended or will be required to expend the following sums in connection with the contract with Respondent: $12,400 - the amount paid directly to Respondent; $1,210 - the amount of the roofer's lien; $965 representing the amount owed to the electrician; and $675 representing the amount Kairy paid the plumbing subcontractor for a total of $15,250. 4/ Although Respondent completed approximately 70 percent of the actual construction, Kairy will correspondingly be required to expend approximately 90 percent of the contract price over and above monies paid to Respondent to complete this project. DOAH CASE NO. 84-3202 On May 12, 1983, the City of Miramar issued William Borden an owner/builder permit for the construction of a four-bedroom, three-bath home to be located in Miramar, Florida. (Petitioner's Exhibit 8) Between May and October, 1983, the Bordens performed the site preparation necessary for pouring the building's foundation and slab. After observing Respondent's classified advertisement in a local flier, the Bordens contacted Respondent with regard to the construction of their home. (Tr. page 16) On November 11, 1983, Respondent contracted with the Bordens to provide certain contracting services relative to the construction of their home. The Bordens contracted Respondent to pour the foundation and slab, perform the block work, frame and pour the tie-beam and tie-columns. (Petitioner's Exhibit 3, Tr. pages 18-20) The Bordens were to complete all of remaining construction of their home) The contract price was approximately $16,810. On October 17, 1983, the City of Miramar issued William Borden an owner/builder permit. (Petitioner's Exhibit 7) William Borden was to install the rough plumbing prior to Respondent pouring the foundation and slab. (Tr. 33) Due to certain time constraints, Respondent offered to install the rough plumbing. On October 25, 1983, Respondent received $475 from the Bordens toward installation of the rough plumbing. Respondent failed to subcontract the installation of the rough plumbing and failed to obtain the necessary building permit. On November 8, 1983, the Bordens provided Respondent an additional $470 representing final payment for installation of the rough plumbing. (Petitioner's Exhibit 4) On November 1, 1983, Mr. Bill Lafferty, chief building and mechanical inspector for the City of Miramar, performed an inspection of the rough plumbing work performed for the Bordens by Respondent. Lafferty determined that Respondent had failed to install the rough plumbing in accordance with provisions of the South Florida Building Code as adopted by the Broward County Code. As a consequence, Lafferty required Respondent to remove and reinstall the rough plumbing in accordance with applicable building code provisions. On November 7, 1983, Lafferty reinspected and approved the rough plumbing as reinstalled by Respondent. (Tr. pages 51-55) Respondent reinstalled rough plumbing at the Borden residence during the first week of November, 1983. Respondent did not obtain a building permit prior to reinstalling the rough plumbing. On November 16, 1983, the City of Miramar levied against Respondent a fee totalling $163.45. Part of that levy included $63.45 for renewal of the building permit and reinspection fee, and the remaining $100 represented a fine against Respondent for failing to properly obtain a building permit. (Tr. pages 58, 64 and Petitioner's Exhibit 7) On November 10, 1983, Salvatore Jenco, structural building inspector for the City of Miramar Building Department, inspected and approved the footing slab for the Borden residence. Subsequently, Respondent poured the concrete slab and foundation. Respondent did not obtain the requisite building permit prior to proceeding with construction. Respondent could not properly proceed with construction pursuant to William Borden's owner/builder permit. On November 11, 1983, inspector Jenco reinspected the concrete slab and foundation as poured by Respondent. As a result of that inspection, Jenco ordered all construction activities to be stopped at the Borden project. Specifically, Respondent materially deviated from the architect's plans and specifications by failing to pour a monolithic (continuous) slab and foundation for the Borden residence. As result of that deviation, the structural integrity of the building was compromised. (Tr. pages 71-73) Construction activity at the Borden residence was halted approximately three weeks while the Borden's architect developed a new set of blueprints. After the City approved the revised blueprints, Respondent began laying blocks and framing the tie-beam. Subsequently, Respondent requested Sunshine Concrete Company to commence pouring the tie-beam. The concrete company requested payment in cash due to the fact that Respondent had previously tendered a check to Sunshine Concrete Company which was returned due to insufficient funds. When informed of the concrete company's demands, the Respondent ordered the company to cease pouring the tie-beam. Upon being informed the tie-beam required a continuous pour, Respondent left the construction site and the Bordens were required to directly reimburse the concrete company. Respondent abandoned the project and has not returned to the construction site. Respondent owes the Bordens approximately $4,696 in reimbursed expenses. (Tr. pages 40-42) Respondent's Defense In DOAH Case No. 84-1298, Respondent did not offer any testimony to refute or otherwise rebut the allegations set forth in the Administrative Complaint. Respondent refused to be placed under oath when he made statements as to his position in Case No. 84-3202.

Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent's certified general contractor's license be suspended for a period of two (2) years. Additionally, Respondent shall pay to the Construction Industry Licensing Board an administrative fine in the amount of $2,500. However, if Respondent provides the Construction Industry Licensing Board with sufficient evidence indicating settlement and satisfaction of the existing disputes between Mr. Albert Kairy and Mr. and Mrs. William Borden, the suspension shall be reduced to one (1) year after which time it is recommended that his license be reinstated. RECOMMENDED this 8th day of May, 1985, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 9th day of May, 1985.

Florida Laws (4) 120.57489.105489.113489.129
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE LONGINO, 87-000162 (1987)
Division of Administrative Hearings, Florida Number: 87-000162 Latest Update: Aug. 11, 1987

Findings Of Fact Findings of Fact 1-13 are made based upon the Stipulation of the parties filed on July 10, 1987. Respondent is, and was at all times material to the pending amended administrative complaint, a certified building contractor having been issued license number CB CAO9793 by the Florida Construction Industry Licensing Board. At all times material the pending amended administrative complaint Respondent's certified building contractor license (CB CAO9793) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending amended administrative complaint, a certified air conditioning contractor having been issued license number CA CO24348 by the Florida Construction Industry Licensing Board. At all times material to the pending amended administrative complaint, Respondent's certified air conditioning contractor license (CA CO24348) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending administrative complaint, a registered mechanical contractor having been issued license number PM 0031246 by the Florida Construction Industry Licensing Board. At all times material to the pending administrative complaint, Respondent's mechanical contractor license qualified "J. C. and Sons, Inc." with the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was Respondent the qualifying agent for "First City Contractors, Inc." as defined by Sections 489.105(4) and 489.119, Florida Statutes. At no time material to the pending amended administrative complaint was Charles L. Crowe registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was "First City Contractor's, Inc." registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. On or about January 23, 1986, Charles L. Crowe d/b/a First City Contractors, Inc., contracted with Steve Bell to construct a room addition at 3110 Carrevero Drive West, Jacksonville, Florida. The contract price was approximately $25,000. On or about March 10, 1986, the City of Jacksonville, Building and Zoning Inspection Division, issued building permit number 6196 to George E. Longino and Associates, Inc. The above referenced building permit was for the construction of a room addition at the residence of Steve Bell, 3110 Carrevero Drive West, Jacksonville, Florida. The following Findings of Fact are based upon the evidence introduced at formal hearing. In December, 1985, or January, 1986, Charles L. Crowe, sole owner of First City Contractors, Inc., approached Longino and asked him to become a partner in the business and to pull permits and be the qualifying agent for First City Contractors, Inc. Longino advised Crowe that he would not be interested in doing that until he had resolved certain pending problems with his licenses. Specifically, the Construction Industry Licensing Board had filed a disciplinary action against Respondent's licenses and that case had been heard and a Recommended Order entered on October 30, 1985. The Recommended Order was scheduled to be considered by the Construction Industry Licensing Board on January 9, 1986. Longino did agree to pull permits for any job on which he would be paid to supervise the construction. Longino did pull the permit and supervise the construction of a garage addition in Arlington, Jacksonville, Florida, for First City Contractors in January or February, 1986. On January 23, 1986, Charles L. Crowe, doing business as First City Contractors, Inc., entered into a contract with Steve Bell to construct a room addition to a residence located at 3110 Carrevero Drive, Jacksonville, Florida. The contract price was $25,000. Based upon the contract, Crowe asked Longino to use his license number to sign a permit application for the Bell job. Longino used a building permit application form which he had in his truck and filled in the pertinent information on the building permit application. Specifically, Longino filled in the name of the licensed contractor as "First City Contractors, Inc." and signed his name as the licensee with license number CB CA09793. Longino signed the building permit application on or about the last week of January, 1986. Financing was not secured for the Bell job until March, 1986. On March 10, 1986, Crowe used the permit application which had been previously signed by Longino and sent an employee of First City Contractors, Inc., Robert Cumpston, to secure a building permit from the City of Jacksonville for the Bell job. Specifically, permit number 6196 was issued based upon the permit application which had been previously signed by Longino. On February 19, 1986, the Construction Industry Licensing Board entered a Final Order suspending Longino's licenses. Longino received notice of the suspension on February 24, 1986, by certified mail. Longino advised Crowe that his licenses had been suspended within a few days following receipt of the Final Order. Despite the knowledge that Longino's licenses had been suspended, Crowe used the presigned building permit application to secure a building permit for the Bell job on March 10, 1986. Building permit number 6196 was issued to Longino's license number doing business as George E. Longino and Associates, Inc. The name of the business was changed from that which was stated on the building permit application because Longino was not a qualifying agent for First City Contractors, Inc. He was only a qualifying agent for George E. Longino and Associates, Inc. A permit could not be issued to First City Contractors, Inc. using Longino's license number. The Bell job was completed using permit number 6196. Longino did supervise that construction and was present at the site on a daily basis. Permit number 6196 was posted at the site. Despite Longino's statements that he did not know that the permit was issued to his license number, it is found that Longino knew or should have known that permit number 6196 was issued to his license number, doing business as George E. Longino and Associates, Inc. Longino did nothing to remedy the problem even though his licenses had been suspended.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Professional Regulation, Construction Industry Licensing Board, enter a Final Order suspending the licenses of George E. Longino for a period of one (1) year in addition to the previous suspension. DONE and ENTERED this 11th day of August, 1987, in Leon County, Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of August, 1987. COPIES FURNISHED: Van Poole, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely Executive Director Construction Industry Licensing Board Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 William Bruce Muench, Esquire 438 East Monroe Street Jacksonville, Florida 32201 =================================================================

Florida Laws (5) 120.57489.105489.119489.127489.129
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEVEN E. SHIELDS, 82-001342 (1982)
Division of Administrative Hearings, Florida Number: 82-001342 Latest Update: Dec. 02, 1983

Findings Of Fact The Respondent is licensed as a general contractor in the State of Florida and registered with the Florida Construction Industry Licensing Board. That agency is the agency charged with regulating the practice of contracting in the State of Florida and with monitoring the compliance of licensees with the various provisions of Chapter 489, Florida Statutes, and pertinent rules relating to licensure standards and practice standards of contractors. On April 23, 1980, one Terry Burch and Jim Goodman were operating a construction business under the fictitious name of "T. J. Associates." Neither Terry Burch or Jim Goodman, nor the entity known as T. J. Associates, was qualified or licensed with the Florida Construction Industry Licensing Board at that time, nor at times subsequent thereto which are pertinent to this proceeding. On April 23, 1980, T. J. Associates entered into a written contract with homeowners Florence Martin and her husband to remodel their home at 120 Broadview Avenue, Winter Park, Florida. The original contract was for $26,615.00 with various addenda to that contract, such that the total net contract price, with modifications, ultimately reached $40,597.00. Both the contract and the modification agreements were signed by the Martins and Terry Burch of T. J. Associates. The Respondent, Steven Shields, was not a party to any of these agreements. Mr. Burch and Mr. Goodman of T. J. Associates, obtained the Martin contract entirely through their own efforts and after obtaining the signed contract, approached the Respondent, Steven Shields, to ask him to draft blueprints for the job, also proposing that the three of them enter into some sort of partnership or other business arrangement. During the meeting at which this business was discussed, it was revealed to the Respondent that T. J. Associates was unlicensed with the Florida Construction Industry Licensing Board and the three men agreed that they would obtain proper application documents from the Board's office in Orlando for filing so as to properly qualify the company. In the meantime, the Respondent agreed to obtain from the City of Winter Park Building Department, the necessary building permits and did so. The Respondent was ultimately paid $600.00 by T. J. Associates for labor he performed on the subject project and for obtaining a building permit in his own name. The Respondent ultimately decided not to enter into a business relationship with T. J. Associates, Burch and Goodman. He did, however, work on the "Martin project" as a sort of job supervisor or foreman, performing some labor on the job and going to the job site on possibly two or three occasions during the course of the construction effort of T. J. Associates. The Respondent initially intended to use his contractor's license to properly qualify T. J. Associates with the Board and obtain the papers to do so, but after he did not enter the formal business relationship with T. J. Associates, neglected to do so, nor did T. J. Associates make any further effort to qualify itself as a contracting entity with the Florida Construction Industry Licensing Board. The Respondent did obtain the building permit for T. J. Associates for the Martin job on May 13, 1980, and obtained it under his individual name and contractor license number. T. J. Associates worked on the Martin job from May 6, 1980, to July 16, 1980. On July 16, 1980, after a dispute regarding the quality of the paint work and other matters, T. J. Associates and the Respondent stopped all work. At the time of the stoppage, the work was 90 percent complete. At the time the work was stopped, no more money was due to T. J. Associates for work already performed. The Martins, at that point, had paid T. J. Associates $35,900.00. The Martins had however, upon advice of their attorney, withheld sufficient funds at the point of cessation of work by T. J. Associates, to enable them to pay for the completion of the job by other labor and materialmen. Three subcontractors had been hired or contracted with by T. J. Associates for work which was performed by them on the Martin job. Those three subcontractors, Mr. Anthony Costa, Mr. Clyde Ray and Mr. Michael Ellis, had performed work for which they were owed, respectively, $531.00, $550.00 and $130.00. None of those three subcontractors have, as yet, been paid for these amounts. They repeatedly attempted to obtain payment from T. J. Associates, but were given no satisfaction in that regard. The Respondent never entered into any agreement or hiring arrangement with the three subcontractors involved, nor did the Respondent ever have possession or control of any funds paid from the Martins to T. J. Associates from which the subcontractors should have been paid. The Respondent only received the above- mentioned $600.00 from T. J. Associates for his services.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence in the record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED that the Respondent be found guilty of a violation of Section 489.129(1)(e) and (k), in that he aided and abetted an uncertified, unregistered person to evade the act and violated Subsection (k) by abandoning the project without just cause. The remaining charges in the Administrative Complaint should, however, be dismissed. In view of the violations proven, an administrative fine of $500.00 and a three (3) month suspension of his license, followed by a one (1) year period of probation is warranted. DONE and ENTERED this 22nd day of August, 1983, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of August, 1983. COPIES FURNISHED: Douglas A. Shropshire, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Charles E. Hoequist, Esquire 301 North Ferncreek Orlando, Florida 32803 James Linnan, Executive Director Florida Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32202 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (5) 120.57489.105489.113489.119489.129
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. MARLENE E. LUTMAN, 79-001546 (1979)
Division of Administrative Hearings, Florida Number: 79-001546 Latest Update: May 15, 1980

Findings Of Fact The Respondent, Marlene E. Lutman, is a vice president of American Custom Builders, Inc. and was a vice president in 1977. Respondent holds licenses Number CR C012570 end Number CR CA12570 issued by the Petitioner Board. On September 11, 1978, Respondent submitted a certification change of status application to the Florida Construction Industry Licensing Board. This application, completed by Respondent under oath on September 7, 1978, was filed for the purpose of changing the contractor's licenses held by Respondent to add the name of American Custom Builders, Inc. to said licenses. On July 6, 1979, an Administrative Complaint was filed against Respondent, doing business as American Custom Builders, Inc., seeking to permanently revoke her licenses and her right to practice under said licenses and to impose an administrative fine in the amount of $500.00. Respondent Lutman requested an administrative hearing, which was scheduled for September 6, 1979, continued on Motion of Respondent, and held November 29, 1979. On the application completed by Respondent, Question 12(b) asked: Are there now any unpaid past-due bills or claims for labor, materials, or services, as a result of the construction operations of any person named in (i) below or any organization in which such person was a member of the personnel? Question 12(c) of the application asked: Are there now any liens, suits, or judgments of record or pending as a result of the construction operations of any person named in "(i) below" or any organization in which any such person was a member of the personnel? Respondent, as a vice president of American Custom Builders, Inc., was designated in "(i) below." She answered "no" on the application to both of the above stated questions. Respondent completed the application while she was in Florida. Prior to completing the application, Respondent spoke by telephone with John D. Cannell, an attorney in Ohio, in reference to Questions 12(b) and 12(c), supra. Cannell told Respondent that there were no unpaid bills outstanding. He said that there had been liens filed involving American Custom Builders, Inc., but that these liens had been cancelled. Cannell based his statements to Respondent upon oral assurances from personnel at the bank involved in financing the construction project associated with the liens that all liens had been paid. It was later learned that on September 7, 1978, the date Cannell told Respondent the liens had been cancelled, the liens had not been cancelled and were of record in the Recorder's Office of Geauga County, Ohio. Liens had been filed on January 6, 1978, January 23, 1978, and January 3l, 1978, by various subcontractors involved in the construction of a house owned by Winford and Sally Ferrentina. The liens were based on claims against American Custom Builders, Inc. as general contractor and the Ferrentinas as owners for unpaid labor and materials and were not satisfied of record until September 20, 1978, on which date the January 6, 1978 lien was satisfied, and March 22, 1979, on which date the other two (2) liens were satisfied. The Hearing Officer finds that Respondent Lutman did not intend to make a material false statement but negligently relied on oral representations that there were no past-due bills and no liens of record pending as a result of her construction operations. Both parties submitted proposed findings of fact, memoranda of law and proposed recommended orders, and the Petitioner Board submitted a reply memorandum. These instruments were considered in the writing of this order. To the extent the proposed findings of fact have not been adopted in, or are inconsistent with, factual findings in this order they have been specifically rejected as being irrelevant or not having been supported by the evidence.

Recommendation Based upon the foregoing Findings and Conclusions of Law, the Hearing Officer recommends that the Respondent, Marlene Lutman, be reprimanded. DONE and ORDERED this 1st day of February, 1980, in Tallahassee, Leon County, Florida. COPIES FURNISHED: Jeffery B. Morris, Esquire 2400 Independent Square One Independent Drive Jacksonville, Florida 32202 Jeffrey R. Garvin, Esquire 2532 East First Street Post Office Box 2040 Fort Myers, Florida 33902 DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DOAH CASE NO. 79-1546 Marlene Lutman, CR C012570, CR CA 12570 Respondent, /

Florida Laws (2) 120.57489.127
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. THOMAS J. EMBRO, 81-001706 (1981)
Division of Administrative Hearings, Florida Number: 81-001706 Latest Update: Apr. 16, 1982

Findings Of Fact The Respondent, Thomas J. Embro holds two licenses issued by Petitioner. They are RG0021774, registered general contractor, and RC0021647, registered roofing contractor. He has held these licenses since 1974. Sometime in the fall of 1979 Respondent was hired by Richard F. Rogers to replace the roof on a residential structure located at 4119 N.W. 12th Avenue, Gainesville, Florida. At that time the house was for sale. Mr. Rogers, who is a real estate agent, wanted the roof replaced in anticipation of a Veterans Administration financed sale of the house to Mr. William Schrader. Prior to beginning work on the roof Mr. Embro did not obtain a building permit from the City of Gainesville for the job. On October 1, 1979 Mr. Schrader made a complaint to the Building Division of the City of Gainesville. His complaint stated that the roofing work performed by Respondent was unsatisfactory. Mr. Al Davis, a building inspector employed by Gainesville, reviewed the city records and determined that a permit had not been issued to Respondent for reroofing Mr. Schrader's house. On October 3, 1979 Mr. Davis wrote a letter to Mr. Embro which stated in its entirety: October 3, 1979 Mr. Thomas J. Embro 3816 SW 18 Street Gainesville, Florida Dear Sir: We have received a complaint from Mr. Bill Schrader of 4119 NW 12th Avenue on the reroofing that you performed on his residence. After receiving the complaint I investigated out records and the work performed by your company and found the following violations: Our records indicate that a permit was not issued to reroof the above address, this is a violation of Section 106.1 of the Southern Standard Building Code. The roof material was not installed correctly. Shingles shall be installed in accordance to manufacture [sic] re- quirements and some parts of the roof are too flat for shingles. Interior damage has been caused by the roof leaking from not installing the shingles as required. The above violations shall be corrected within 10 days from receipt of this letter. Your compliance will make further action unnecessary. Sincerely, /s/ Al Davis Building Official cc: Mr. Bill Dow, State Investigator Mr. Bill Schrader Mr. Embro applied on October 25, 1979 for a permit from Gainesville for the work at 4119 N.W. 12th Avenue. The permit was issued on December 6, 1979. It is not unusual in Gainesville for a contractor to begin a construction job before the appropriate permit is applied for or issued. When this is not a frequent practice of a particular contractor the City imposes no penalty. If the contractor habitually begins construction without permits, the City imposes a penalty by charging him double the regular permit application fee. Mr. Embro was not charged a penalty by the City in this case. In the course of his contracting business Mr. Embro frequently asked his wife to make permit applications for him before he begins work. In this case he believed that she had applied for the appropriate permit. The City of Gainesville allows persons other than the contractor to apply for a building permit on behalf of a contractor if the contractor has first filed an authorization with the City designating an agent. Mr. Embro filed such an authorization on February 13, 1980 for his wife to be his designated agent.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Professional Regulation, Florida Construction Industry Licensing Board enter a final order dismissing the Administrative Complaint against Thomas J. Embro. DONE and RECOMMENDED this 16th day of November, 1981, in Tallahassee, Florida. MICHAEL PEARCE DODSON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of November, 1981.

Florida Laws (3) 120.57489.12990.202
# 6
SAMUEL OMEGA ROLLINS vs CONSTRUCTION INDUSTRY LICENSING BOARD, 09-002968 (2009)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 29, 2009 Number: 09-002968 Latest Update: Nov. 12, 2019

The Issue Whether Petitioner is entitled to licensure as a Certified Building Contractor or Residential Contractor.

Findings Of Fact Petitioner is a 44-year-old male. He was born and raised in Tallahassee, Florida. He is a high school graduate. Petitioner passed the examination for licensure as a certified building contractor. This is a comprehensive examination that is designed to test knowledge in all aspects of the construction industry. Passing it is a mandatory prerequisite before an application can be considered by the Florida Construction Industry Licensing Board (FCILB). However, passing the examination does not eliminate or modify the statutory or rule experience requirements. Petitioner submitted his application for a certified building contractor license on or about March 24, 2008. By letter of May 2, 2008, the Department of Business and Professional Regulation requested additional information. Petitioner then provided a revised affidavit from Chad Banks, a certified building contractor, and a letter from the Maintenance Construction Chief of the City of Tallahassee’s Gas Utility Department, each containing more detailed information about Petitioner’s experience. These items were received by Respondent on May 23, 2008. It is not clear whether Petitioner requested and was granted a continuance of his appearance with regard to the instant license application at an earlier FCILB meeting, but on January 15, 2009, the full Board considered Petitioner’s application at a duly-noticed public meeting in Altamonte Springs, Florida. At that time, Petitioner was present. During his appearance before the full Board on January 15, 2009, Petitioner was very nervous, but he believes that one of the Board members offered him, or at least asked him if he would accept, a residential contractor’s license in place of a certified building contractor’s license, and that he answered that he would accept such a license, only to have that “offer and acceptance” voted down by the full Board. However, Petitioner does not rule out the possibility that the vote taken at the meeting was actually with regard to denying the certified building contractor license for which he had applied. There is no evidence that Petitioner has ever submitted an application for a residential contractor’s license. By a Notice of Intent to Deny, dated March 16, 2009, and mailed March 24, 2009, the FCILB formally denied Petitioner’s application for a certified building contractor License stating: The applicant failed to demonstrate the required experience, pursuant to Section 489.111, Florida Statutes and Rule 61G4- 15.001, Florida Administrative Code. Petitioner seeks licensure as one who has four years of active experience and who has learned the trade by serving an apprenticeship as a skilled worker or as a foreman, at least one year of which experience is as a foreman. Petitioner has never worked as a full-time employee of a commercial or residential contractor. Petitioner got early experience in construction working around eight rental properties owned by his father. He performed light carpentry, deck construction, general handyman repairs, and some plumbing and roofing when he was approximately 16 to 21 years of age. However, Petitioner essentially relies on a work history that includes working as a plumber for Jim Bennett Plumbing from 1987 to 1993; as a foreman for the City of Tallahassee Gas Department from 1995 to 2005; as a “contractor trainee” for Chad Banks from 1999 to 2002; as having volunteered as superintendent for Gulf Coast Painting from 2003 to 2007; and as a maintenance man for the City of Tallahassee Parks Department from 2006 to 2007. Petitioner’s dates of employment overlap, because his volunteer experience was acquired mostly on weekends, holidays, in hours after he had already completed a full work day for the City of Tallahassee, or on “time off” from his regular employments with the City. Petitioner is a hard worker and wanted to learn the construction trade, but his volunteer construction jobs were intermittent, and he provided no clear assessment of the number of hours per week or month that he put in for any of them. From 1987 to 1993, Petitioner worked for Jim Bennett Plumbing. He started as a plumber’s helper and progressed to greater responsibility. In that position, he acquired a wide range of experience in plumbing for some residential, but mostly commercial, buildings. During this period, he also did some light cosmetic carpentry and tile work to restore building parts damaged by the installation of plumbing apparatus. Much of Petitioner’s construction experience relates to his association with Chad Banks, who testified that at all times material, Petitioner had “hands on” experience, working for him and that Petitioner was a competent worker. Petitioner has never been a “W-2 employee” of Mr. Banks, but there is no specific statutory or rule requirement that the experience necessary to qualify for the certified building contractor or the residential contractor license must be as a “W-2 employee.” Cf. Conclusions of Law. Mr. Banks was not licensed as a certified building contractor until 1999. Petitioner did some work for Mr. Banks when Mr. Banks was working as a sub-contractor on commercial projects (specifically one or more Super-Lube buildings) prior to Mr. Banks obtaining his certified building contractor’s license in 1999. Most of this employment involved pouring concrete slabs. Petitioner claims experience in “elevated slabs,” limited to the construction of a single Super-Lube building, which Petitioner described as laying a slab below ground level for mechanics to stand on and an at-ground level slab for cars to drive onto the lift for an oil change. He described no truly “elevated” slabs or floors above ground level on this project, and Petitioner’s and Mr. Banks’ testimony was vague as to Petitioner’s responsibilities on this project and as to the project’s duration. The general contractor on this project for whom Mr. Banks “subbed” did not testify. From this, and other employments, Petitioner has experience pouring foundation slabs, but he has never worked on a foundation slab in excess of 20,000 square feet. Petitioner also assisted in Mr. Banks’ construction of some rental sheds, but it is unclear if this was before or after Mr. Banks was licensed. Petitioner worked for Mr. Banks d/b/a C. B. Construction, Inc., in a volunteer capacity on exclusively residential construction from 1999 to 2002, and again from February 2004 to March 2008. During these periods, Petitioner and Mr. Banks considered Petitioner a “contractor trainee,” but Petitioner’s work for Mr. Banks was neither exclusive nor continuous; both men described it as “volunteer” work; and some of it seems to have amounted to Petitioner's looking over work done personally by Mr. Banks and having Mr. Banks explain to him, via a plan sheet, what Mr. Banks had already done personally. There is no evidence that during this time frame Petitioner worked for Mr. Banks as a foreman. Petitioner has the ability to “read” many types of construction “plans.” Petitioner has experience with slab footers, but he has not constructed red iron structural steel qualified for framing a building. Petitioner has experience in decorative masonry walls, but he has not constructed structural masonry walls of a type that would support framing members of a building or other vertical construction. Petitioner also worked for the City of Tallahassee as a “W-2” employee, mostly as a foreman overseeing a crew of four workers, from 1995 to 2005. In that capacity, he worked on a church, but the church itself had been constructed several years previously, and Petitioner’s crew’s contribution was tying-in several gas lines during a roadway development project and keeping all the utilities up and running during the project, while a private contractor worked on the church. With regard to the foregoing project and many others for the City Utilities Department, Petitioner directed a crew that built sidewalks and gutters or that tied these features into existing roadways and driveways. In that capacity, he often coordinated activities with residential contractors. Over his ten years’ employment with the City Utilities, Petitioner also directed a crew that exclusively created underground vaults for the housing and shelter of utility apparatus. However, none of his endeavors for the City Utilities involved vertical structural construction for floors above ground. Petitioner has also built new gas stations for the City’s natural gas vehicles, and has erected pre-fab utility buildings, including much slab work, but the nature and duration of these endeavors is not sufficiently clear to categorize them as qualifying him for the certified building contractor license. Most of Petitioner’s experience with the City, as substantiated by the letter of the City Utilities Maintenance Construction Chief, Mr. Lavine, has been in the construction of driveways, roads, gutters, storm drains, sidewalks, culverts, underground utility structures, plumbing and gas lines. While it is accepted that Petitioner has worked on such projects, this type of work more properly falls in the categories of “plumbing contractor” or “underground utility contractor” and Mr. Lavine was not demonstrated to have any certification/licensure in a category appropriate to Petitioner’s application. (See Conclusions of Law.) Sometime after 2005, for approximately a year, Petitioner was employed by the City of Tallahassee Parks and Recreation Department and in that capacity participated in at least one construction of a dugout and a concession stand at one of its playgrounds. He also did repairs on several dugouts and concession stands, but this latter work would not be classified as “structural” construction. Petitioner’s experience in precast concrete structures is limited to his work with gas utility structures, but does not include work on precast tilt walls, which are the type of walls that are constructed off-site, delivered to the job site, placed on the slab foundation, and raised in place as part of an on- going commercial building project. Petitioner has no experience in column erection. “Columns” in this context within the construction trade refers to supports for upper level structural members, which would entail vertical construction. Petitioner’s experience in concrete formwork does not include experience in the structurally reinforced concrete formwork that would be used in vertical buildings, such as all floors above ground level. FCILB’s Chairman testified that the Board interprets the type of experience necessary to comply with the statutes and rules, more particularly Florida Administrative Code Rule 61G4- 15.001(2), to be “structural experience.” There is no affirmative evidence that Petitioner has ever notified the Clerk of the Agency that he was relying on a right to a default license.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Construction Industry Licensing Board enter a Final Order denying Petitioner’s application for licensure as a Certified Building Contractor. DONE AND ENTERED this 24th day of November, 2009, in Tallahassee, Leon County, Florida. S ELLA JANE P. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of November, 2009.

Florida Laws (5) 120.569120.57120.60120.68489.111 Florida Administrative Code (1) 61G4-15.001
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHNNY C. FOSSETT, 84-001674 (1984)
Division of Administrative Hearings, Florida Number: 84-001674 Latest Update: Mar. 01, 1985

The Issue The issues in this matter are as established through an Administrative Complaint brought by the State of Florida, Department of Professional Regulation, against Johnny C. Fossett alleging various violations of Chapter 489, Florida Statutes, related to a job conducted for Joshua and Jacquelyn Williams. More specifically, Respondent is accused of violation of Section 489.129(1)(j) , Florida Statutes (1981), by failing to properly qualify a company under which he was doing business. In a related vein, he is accused of violation of Section 489.129(1)(g) Florida Statutes (1981), by acting in a name other than that on his license. Respondent is accused of violating Section 489.129(1)(d), Florida Statutes (1981), for willful and deliberate disregard and violation of a local building code. Respondent is accused of violating Section 489.129(1)(j), Florida Statutes, for contracting beyond the scope of his registration. Finally, Respondent is accused of a violation of Section 489.129(2), Florida Statutes,(1981), in violating Rule 21E-15.07, Florida Administrative Code, by failure to notify the Construction Industry Licensing Board of a change of address within 30 days of such change.

Findings Of Fact Respondent, Johnny C. Fossett, is the holder of a license issued by the Florida Construction Industry Licensing Board in the field of registered roofing contractor. That license number is RC 0040728. Respondent is also the qualifying agent of J. C. Fossett Roofing & Maintenance Repair of 4978 Soutel Drive, Jacksonville, Florida. In addition to the Soutel address associated with J. C. Fossett Roofing & Maintenance Repair, Respondent has given the Florida Construction Industry Licensing Board the address 8937 Castle Boulevard, Jacksonville, Florida, as his address. On April 15, 1983, Respondent contracted with Joshua and Jacqelyn Williams of 4634 Fairleigh Avenue, Jacksonville, Florida, for the construction of a utility building with roof; to repour a carport slab; and to construct a screened-in patio with roof. The agreement was also for the removal of a tree hanging over the den and carport area of the existing home. The total price of this contract was $3,550. Eighteen hundred dollars was paid as a deposit, and the remainder of the contract price was paid on May 11, 1983. In the proposal or contract agreement Respondent noted that the work was guaranteed by an entity known as J. C. Roofing. A copy of this proposal may be found as Petitioner'S Exhibit No. 2 admitted into evidence. Neither the Respondent nor any other duly licensed contractor had qualified the entity/organization known as J. C.. Roofing with the Florida Construction Industry Licensing Board. Respondent performed the work called for in the contract, without obtaining the necessary building permit from the City of Jacksonville, Florida. Respondent was registered with the City of Jacksonville as a roofing contractor. He was not registered in the fields of general contracting, building contracting, or residential contracting, which would have been necessary before Respondent could conduct that work for the Williamses, other than roofing. Respondent could not have been registered with the City of Jacksonville in those fields of general contracting, building contracting, and residential contracting because he was not qualified. The Williamses experienced problems with the quality of Respondent's work, most notable, leaks in the roof that Respondent had worked on. When it rained water would run down the walls and promote mildew. This was in the area of the joining of the roof over the patio and the roof over the carport. In response to complaints, Fossett made such remarks as "A little water on the roof is good" and offered to drill holes in the roof and install rain gutters to alleviate the problem. The owners found this unacceptable. Respondent having failed to satisfy their claims, the Williamses sought other assistance in effecting repairs. The roof still leaks. On the occasion of attempting to have these problems corrected, the Williamses sought to contact the Respondent at his Soutel address by calling the number found on the business card provided by the Respondent. When phoning that number it was discovered that someone other than the Respondent was doing business from the Soutel address. The phone number was the Respondent's residential number. The card, as given to the Williamses, indicates that the business is J & C Roofing Company, Johnny C. Fossett, Owner. Again, this business name is one for which the Florida Construction Industry Licensing Board has no indication of a duly licensed contractor properly qualifying that entity, either the Respondent or some other person. Petitioner's Exhibits Nos. 5 through 7, admitted into evidence, are photographs of the work done by the Respondent, to include roofing, and the mildew on the concrete blocks found on the outside of the patio wall which was promoted by the leak in the roof.

Florida Laws (4) 120.57489.117489.119489.129
# 8
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs JAMES EDWARD FOSTER, 99-002640 (1999)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Jun. 14, 1999 Number: 99-002640 Latest Update: Aug. 10, 2000

The Issue Respondent was charged in a November 19, 1998, Administrative Complaint, filed December 7, 1998, with ten counts of professional violations. The statutory violations alleged are: Count I: Section 489.129(1)(a), Florida Statutes (1995), obtaining a certificate or registration as a Certified Roofing Contractor by fraud or misrepresentation; Count II: Section 489.129(1)(h)2, Florida Statutes (1995), by committing mismanagement or misconduct in the practice of contracting that caused financial harm to a customer; Count III: Section 489.129(1)(k), Florida Statutes (1995), by abandoning a construction project in which the contractor is engaged or under contract as a contractor; Count IV: Section 489.129(1)(m), Florida Statutes (1995), by committing fraud or deceit in the practice of contracting; Count V: Section 489.129(1)(n), Florida Statutes (1995), by committing incompetency or misconduct in the practice of contracting; Count VI: Section 489.129(1)(p), Florida Statutes (1995), by proceeding on a job without obtaining the applicable local building department plumbing permits and inspection; Count VII: Section 489.129(1)(p), Florida Statutes (1995), by proceeding on a job without obtaining the applicable local building department electrical permits and inspection; Count VIII: Section 489.129(1)(p), Florida Statutes (1995), by proceeding on a job without obtaining the applicable local building department framing, insulation, and/or final inspections; Count IX: Section 489.129(1)(o), Florida Statutes (1995), by committing gross negligence, repeated negligence, or negligence resulting in a significant danger to life or property; and Count X: Section 389.129(1)(c), Florida Statutes (1995), by violating any provision of Chapter 455, to wit, Section 455.227(1)(o), practicing beyond the scope permitted by law and performing professional responsibilities the licensee knows, or has reason to know, he is not competent to perform.

Findings Of Fact At all times material to the allegations of the Administrative Complaint, Respondent was a Certified Residential Contractor, having been issued license number CR C057235, by the Florida Construction Industry Licensing Board. At the time of hearing, Respondent's license had been suspended. Since January 27, 1998, Respondent also has been a Certified Roofing Contractor, having been issued license number CC C057649, by the Florida Construction Industry Licensing Board. At no time material was Respondent licensed, registered, or certified to perform electrical work. At no time material was Respondent licensed, registered, or certified to perform plumbing work. On or about February 27, 1997, Respondent entered into a $39,050.40, contract with Reuben M. Adams to restore and repair the Adamses' home at 7037 Mark Street in Jacksonville, Florida, which had been destroyed by fire on February 1, 1997. The work contracted-for included complete restoration of the living room, kitchen, two hallways, two bathrooms, four bedrooms, a laundry room, and a dining room; restoration of heat and air conditioning; and a virtually new roof. Among the electrical and plumbing restoration involved, Respondent specifically agreed to install a ceiling fan and a light kit in the living room; install a sink and faucet for the sink and a ceiling light fixture and vented range hood in the kitchen; install a ceiling light fixture in a hallway; remove floor mounted with tank commode and reinstall a floor mounted with tank commode; replace commode sink, remove and reinstall sink, install new faucet for the sink, install shower head and faucet set for bathtub, install bathroom exhaust fan and light kit for ceiling fan in the bathroom; install ceiling fan and light kit in bedrooms; replace faucet for sink and provide a shower head, faucet set and install a ceiling light fixture in the second bathroom; install a ceiling fan and light kit in the third and fourth bedrooms and dining room and hallway; install 960 square foot electrical and provide temporary utilities for dimensions of 40 feet by 24 feet by eight feet. These types of activities require electrical and plumbing licensure. On or about April 15, 1997, Respondent received and endorsed the first draw check of $22,245.23 from the Adamses. In May 1997, Respondent's site supervisor, Aaron Mitchell, requested that Mr. Adams give him $1500.00, cash to buy materials because Respondent was out of town and Mitchell could not perform the work without the materials. Mr. Adams paid this amount in cash to Mr. Mitchell but was never reimbursed by either Mr. Mitchell or Respondent. In early June 1997, the Adamses became concerned because little work had been completed on the restoration of their home. The house had been cleaned out and gutted and the slab for the room addition had been poured. Mr. Adams contacted Respondent several times about the lack of work being performed on the home. Between mid-June and early July 1997, Respondent completed the framing and installed the roof. On or about July 24, 1997, the Adamses released the second draw of $11,122.62 to Respondent, and Respondent deposited the money into his bank account. In approximately August 1997, Respondent ran electrical wire in the roof, installed electrical outlets in the walls, and completed the electrical work, including installing electrical outlets in the walls. Mr. Adams personally observed Respondent and his workers performing electrical wiring. The electrical work performed by Respondent required licensure as an electrical contractor, that a permit be obtained prior to the electrical work being performed, and that inspections of the electrical work be made before the walls were sealed up over the electrical work. Respondent failed to obtain a permit or to have an electrical inspection performed. Respondent completed the electrical work and covered up the electrical work with the walls without an inspection being performed. Respondent performed plumbing work on the Adamses' home, although he held no plumbing license. Respondent failed to pull a permit for the plumbing work and failed to call for the required inspections. Ultimately, he covered up the plumbing work with the walls without an inspection having been performed. The City of Jacksonville "red-tagged" the home for this reason. The effect of "red-tagging" was to prevent occupancy until compliance with the building code was assured. Such assurance required inspection, which in turn, ultimately required that at least the interior walls be taken down. Respondent also never obtained a framing, insulation or final inspection on the project. In October 1997, the Adamses filed complaints against the Respondent with the State Attorney's Office and the Department of Business and Professional Regulation (Case No. 97-18544). On or about October 31, 1997, Respondent signed a Letter of Intent with Mr. and Mrs. Adams agreeing to have their home ready for occupancy no later than December 1, 1997, and promising that Respondent would be responsible for all permits and inspections necessary for the project to be considered complete. At that time, Respondent apologized for all of the delays, the decline in their relationship, and the stress he had caused. Respondent and Mrs. Adams prayed together, and Respondent promised that from that day forward, the Adamses would see progress on their home every day until it was finished. Respondent did not abide by the requirements set forth in the Letter of Intent. Specifically, he never obtained the required permits and inspections. Mr. Adams confronted Respondent about the permits and the inspections, and the Respondent indicated that he had the permits at his office. He assured Mr. Adams that he was taking care of the electrical permit. In December 1997, Respondent requested that Mr. and Mrs. Adams drop their complaint with Petitioner Department of Business and Professional Regulation because he had applied for his roofing license and the complaint was holding up that roofing license being granted. Respondent told the Adamses that if they would drop their complaint, he could obtain his roofing license, which would allow him to generate money to complete their project. Around mid-January 1998, Respondent requested that the Adamses release the final construction draw and drop their complaints with Petitioner and the State Attorney. Respondent stated that if they paid him the final draw of $5,682.55, he would work every day on their project and have it ready for them to move in no later than February 4, 1998. The Adamses paid Respondent the remaining construction draw of $5,682.55, and withdrew their complaint with Petitioner. Respondent accepted the final draw on or about January 27, 1998. Respondent obtained his roofing license after the Adamses withdrew their complaint with Petitioner. After receiving the final construction draw, Respondent did minimal work on the project in January. On or about February 23, 1998, the Adamses reinstated their complaint with Petitioner against Respondent, resulting in the instant case. Respondent has not returned to work on the Adamses' project since March 1998. As of March 1998, Respondent had been paid the full contract price, but the home remained uninhabitable. The workmanship was substandard and the project was less than 100 percent complete. As a result of Respondent's unlicensed electrical and plumbing work on the Adamses' home and his covering-up his work with the walls, the Adamses were unable to obtain an inspection without the walls being taken down. This in turn, required that the walls be rebuilt. In addition to the money paid to Respondent for work improperly done or not done at all, the Adamses had to pay another builder $14,900.00, to remove the walls, re-install the electrical wiring and plumbing which had been completed or partially completed by the Respondent, and complete the renovation. Testimony of Roy Brand, Raymond Smith, and Douglas Arnold supports a finding that Respondent committed repeated negligence and created a dangerous condition when he performed electrical and plumbing work which he was not licensed to do and which he did not have the knowledge to perform. Particularly upon the testimony of Mr. Brand, it is clear that three types of very serious electrical installation errors or omissions had been performed once or more than once by Respondent. At least one of these would have been sufficient, under certain circumstances, to burn down the entire house. By installing electrical universal polyethylene boxes and using them as junction boxes, a purpose for which they were not designed, Respondent created what Mr. Brand described as "short of a 'Molotov Cocktail' that would burn your house down just about as quick." Likewise, one serious error occurred in the type of glue Respondent used on plumbing pipe throughout the home. Mr. Brand gave credible expert evidence that the construction undertaken by Respondent was undertaken for a reasonable amount of $39,050.40, and that a reasonable time to construct the entire contract would have been two and one half to three months after permitting. In addition to the money Mr. and Mrs. Adams paid to Respondent and the substitute contractor, Douglas Arnold, they incurred additional expenses and spent additional time out of their home as a result of Respondent's shoddy workmanship and unlicensed electrical and plumbing work. The Adamses also had to take out a second mortgage of $18,800.00 at 16.3 percent interest for 15 years in order to finance the repairs necessitated by Respondent's substandard and incompetent work, so that they could move back into their home. Mr. and Mrs. Adams and their child had to live somewhere during construction. Their insurance company paid them $750.00, for each of three months. However, they were unable to move back into their home from August 1997 until November 1998, as a direct result of Respondent's incompetence and misconduct.3 During this fifteen-month period, the Adamses paid $300.00 rent per month to Mrs. Adams' mother, plus an additional $100.00 per month for water and utilities, and storage fees of $119.00 per month to a storage facility for keeping their items which had not been destroyed by the fire The Adamses also incurred an additional expense of $1,500.00, for an air conditioning unit which Respondent was to have purchased under their contract with him.

Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Construction Industry Licensing Board enter a final order that: Finds Respondent guilty of one violation of each of the following: Sections 489.129(1)(h)(2); (1)(k); (1)(m); (1)(n); (1)(p); (1)(o); and (1)(c), Florida Statutes (1995); Revokes Respondent's General Contractor's and Roofing Contractor's licenses; Imposes a total fine for all violations, in the amount of $30,000.00; and Requires Respondent to pay restitution to Mr. and Mrs. Adams in the amount of $49,835.00. DONE AND ENTERED this 1st day of May, 2000, in Tallahassee, Leon County, Florida. ELLA JANE P. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of May, 2000.

Florida Laws (8) 120.57455.227489.105489.113489.117489.1195489.129489.505 Florida Administrative Code (4) 61G4 -17.00161G4-12.01861G4-17.00161G4-17.002
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JAMES W. GEARY, D/B/A FIRST TRIANGLE CORPORATION, 77-000613 (1977)
Division of Administrative Hearings, Florida Number: 77-000613 Latest Update: Sep. 08, 1977

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Respondent James W. Geary presently holds certified general contractor's license number CG C005775. Respondent Geary apparently entered into a contract with Phillip Smith to add a screened porch to the Smith residence. Neither the contract nor the testimony of Mr. Smith were made available to the undersigned Hearing Officer. Respondent had difficulty obtaining a roofer and completion of the project was therefore delayed. During the interim, the interior of the Smith's living room suffered water damage. After receiving a complaint from the Smiths, Mr. Robert Jahn, Chief Building Official for the City of Tamarac, personally inspected the Smith project. He found that the water damage was caused by the uncompleted work of respondent and certain violations of the Southern Florida Building Code. Jahn did not know how long the project had not been worked on, but Smith told him he had tried for about one month to get respondent to return to correct the situation. Respondent testified that when he sent a man to the Smith residence to install the roof columns, Smith chased the man off the job. Upon the delivery of certain supplies for his projects, respondent Geary, d/b/a First Triangle Corporation, wrote two checks in the total amount of $391.41 payable to Rinker Materials. (Exhibit 1) These checks were offered for payment by Rinker, and were returned due to insufficient funds. The former credit manager of Rinker Materials did not know whether anyone from Rinker had contacted respondent about the checks. Respondent testified that no one from Rinker had informed him that the checks were dishonored. However, respondent did receive notice from his bank that the checks had been returned. He was changing banks about the same time and felt that the bank had made mistakes in the past. He felt that the checks were good when issued and he therefore did not put much reliance upon the notices received from the bank. Respondent testified that he is ready, willing and able to honor the checks written to Rinker Materials. Respondent Geary apparently entered into a contract with Richard Decker for the addition of a five by eleven foot bathroom to the Decker's residence. Neither the contract, the plans or specifications nor the testimony of Mr. Decker were offered into evidence at the Hearing. Respondent felt there were no deviations between the finished product and the job specifications, and that, even if there had been, there was no way he could put a five foot vanity into the project without violating the applicable building code. The field investigator for petitioner's District No. 10 found deviations from the plans with regard to the size of the vanity, the bathroom door and the illumination. He found that the Deckers had not indicated their approval of such deviations by placing their initials on the plans or specification. The South Florida Building Code (302.2(b)) provides that when the cost of a job is over $5,000.00, the permit applicant must present plans signed and sealed by a registered architect or engineer. A larger permit fee is also required for jobs costing over $5,000.00. On or about April 9, 1976, respondent Geary applied to the City of Tamarac for two building permits. (Exhibit 2). While blueprints were submitted, no plans signed and sealed by a registered architect Or engineer were submitted. From the square footages contained on the right hand column of the application, Chief Building Official Jahn determined that the value of the two projects were $7,300.00 and $6,620.00. The contract prices for these projects were approximately $8,000.00 and $10,000.00. There was no conclusive testimony as to who supplied the footage information on these applications, It was respondent's opinion that the actual costs of these projects did not exceed $5,000.00. Respondent apparently entered into a contract with Daniel Salzman for some project, and then entered into a second contract for the construction and installation of a fence and a trellis. For this second project, respondent received a deposit of $825.00. The first job was never completed by respondent and respondent never began work on the fence and trellis project. Respondent admitted that some $500.00 was due Mr. Salzman as a refund for the second project. He testified that he instructed Mr. Salzman to have the work on the first project completed by someone else and then to send respondent the bill for the same. Respondent has not heard from Salzman regarding this matter. By letter dated November 20, 1976, Chief Building Official Jahn notified respondent that "No further building permits [would] be issued to First Triangle Builders with you as their qualifier because of numerous complaints and unfinished projects." As indicated in the Introduction, petitioner filed an administrative complaint against respondent seeking to revoke his license for violations of certain ordinances and Florida Statutes S468.112(2). The cause was referred to the Division of Administrative Hearings for the appointment of a Hearing Officer, and the undersigned was designated to conduct the hearing.

Recommendation Based upon the findings of fact and conclusions of law recited above, as well as the seriousness of the offenses of which respondent has been found guilty, It Is recommended that respondent's certified general contractor's license number CG C005775 be revoked. Respectfully submitted and entered this 18th day of July, 1977, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings Room 530 Carlton Building Tallahassee, Florida 32304 (488-9675) Area Code 904 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Mr. James W. Geary 4370 Northwest 32nd Court Lauderdale Lakes, Florida Wallace Norman Construction Industry Licensing Board 305 South Andrews Avenue Ft. Lauderdale, Florida 33301 J. K. Linnan, Executive Director Construction Industry Licensing Board Post Office Box 8621 JacksonvIlle, Florida 32211

# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer