Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
ECCELSTON PROPERTIES, LTD. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-004901BID (1988)
Division of Administrative Hearings, Florida Number: 88-004901BID Latest Update: Jan. 12, 1989

Findings Of Fact Prior to June, 1988, HRS determined that it needed 23,871 square feet of office space to house some of its social services for indigents in Northern Escambia County. Since HRS desired more than 2,000 square feet of office space, it was required to bid lease number 590:1987 competitively. To that end, Respondent prepared an Invitation to Bid and a bid submittal package. The package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Specific areas of importance to Respondent in the selection of its office space were: client safety public access, ingress and egress availability of public transportation. The above areas were important to HRS since the agency would render indigent services to approximately 1000 people a month, many of whom are handicapped or lack good mobility due to age or infirmity. The majority of Respondent's clients are served within a 10 day period during each month. A great deal of pressure is placed on the surrounding area due to the in flux of people. Additionally, many of Respondent's clients utilize public transportation since they do not own or have access to personal vehicles. Because of servicing so many people the above factors received a great deal of weight under HRS's consideration of the property it desired to lease and occupy. All of the above areas were covered by Respondent's weighted bid evaluation criteria. Additionally, in order to submit a responsive bid, a prospective lessor was required to meet one of the following qualifications at the time the bid was submitted: (a) be the owner of record of the facility and parking areas; (b) be the lessee of the space being proposed and present with the bid a copy of the lease with documentation of authorization to sublease the facility and parking areas; (c) submit documentation of an option to purchase the facility and/or parking areas; or (d) submit documentation of an option to lease the facility with authorization to, in turn, sublease. The District Administrator of HRS, Chelene Schembera, is ultimately responsible for bidding, selection and leasing of all HRS facilities within District I, including Escambia County, Florida. In order to accomplish this task Ms. Schembera appointed a bid evaluation committee to review and grade the responsive bids under the criteria established in the bid package, and to recommend to her the committee's choice of the lowest and best bid. Ms. Schembera's purpose in establishing the bid evaluation committee was to secure input from a cross section of people who had a variety of backgrounds and knowledge that would be material in evaluating the office space, in light of the uses for which it was intended and the relative public worth of the work space. Ms. Schembera appointed individuals who were familiar with the type of work to be done in the proposed space, as well as persons familiar with the bid process. On July 21, 1988, HRS received five bids on the lease. Intervenors submitted the apparent low bid which Northside consisted of one building located at the Brentwood Shopping Center in Pensacola, Florida. At the time that the Intervenors submitted their bid, they included documentation which showed that they had a contract to purchase the subject facility; they have since closed on that transaction. This bid package did not include the four acres adjacent to the Brentwood Shopping Center property and no contract to purchase or other documentation was submitted as to the four acre parcel of property. Petitioner submitted the apparent second lowest bid which consisted of one building located at Fairfield Plaza in Pensacola, Florida. Petitioner's interest in Fairfield Plaza is that of a lessee under a Master Lease with rights to sublet the property. All appropriate documentation was submitted with the bid. This property was the subject of a semi-friendly foreclosure action at the time that the Petitioner's bid was submitted. Petitioner was still in possession and control of the property. Both Petitioner's and Intervenors' property were within the mandatory geographical area designated in the bid package. Both bids were responsive under the minimum bid specifications and bidder qualifications. The other three bids which were submitted by HRS are not in contention The committee members personally inspected the sites offered by the Petitioner and the Intervenors. While at the Intervenors' site, the committee's concern over the property's minimal parking (as compared to Fairfield) and limited safe public access, ingress and egress were raised. The only access to Intervenor's property was from a very busy multi-lane highway. Certain turns onto and off the property were extremely dangerous. In order to make its bid package more acceptable, Intervenors' representative orally amended the bid package to include the southerly four acres contiguous to the Brentwood property. The Inclusion of the southerly four acres would adequately increase Intervenors' parking. The amendment would also create additional and safer public ingress and egress since the four acres abutted on Murray Lane which intersects Highway 29. This amendment substantially worked to Intervenors' advantage and was a material change to the previously submitted bid. The improper amendment cannot be considered here. Following the on-site inspections, the committee members met and rated the properties submitted by Petitioner and Intervenors according to a Bid Synopsis evaluation sheet which they had been previously provided. The committee members' review of the Intervenors' property included the improper bid amendment. Even with the improper amendment, the unanimous recommendation of the evaluation committee was to award the lease to the Petitioner and Fairfield Plaza. The evaluation committee based its decision on the scores attributed to each property on the Bid Synopsis sheet by the individual committee members. The committee utilized all the weighted bid criteria. However, two factors were of primary importance. One was its determination that the property offered by the Intervenors presented greater problems for ingress and egress due to the congested nature the area. The other consideration was that service to Fairfield Plaza from public transportation was both more frequent and direct. The property offered by the Intervenors had less public transportation service. The stops were less frequent and a significant number of clients would be required to transfer buses to reach Brentwood when utilizing such public transportation. All bus passengers would be required to walk from the bus stop close to Brentwood and attempt at their peril to cross a very busy, dangerous and congested highway. The reasons given by the individual committee members for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. Each individual member gave a rational and reasonable basis for the scoring he or she used on the Bid synopsis score sheets. The scoring was done by each member after discussion of the two buildings and without influence from the other committee members. In essence, the committee felt that Petitioner's property was the better property for the money. Importantly, every committee member came to the conclusion that Petitioner's property was the lowest and best bid. There is no statutory or rule requirement that one scoring method be preferred over another. The only requirement is that the method be rational and reasonable especially where highly subjective, but legitimate criteria are involved in the selection of a piece of property. On these facts, the individual scoring methods used by the individual committee members were not arbitrary and capricious, but were very rational and reasonably related to the relative importance the committee members gave the above factors. The District Administrator initially adopted the committee's recommendation and reported that recommendation to King Davis, the Director of General Services for HRS. The Director of General Services later informed the District Administrator that he and his staff were concerned with the fact that the recommendation was to award the lease to the second lowest bidder. The staff's review considered the improper amendment as part of the Intervenors' bid. Over a ten year period the Petitioner's rental cost was $62,381.00 more than the Intervenors'. In addition, the estimated energy consumption for the first year for the Petitioner's property was approximately $4800 more than for Intervenors. King Davis and his staff did not believe that the justifications cited in the recommendation letter would be considered crucial enough to override awarding the lease to the lowest bidder, should the agency get involved in a bid protest over the award. He and his staff did not disagree that the reasons assigned by the committee and Ms. Schembera were legitimate considerations. Their ultimate concern was that the reasons given by the committee and Ms. Schembera would not be given as great a weight by a Division of Administrative Hearings' hearing officer; and therefore, fail to withstand a potential bid challenge. But the conclusion that the lack of ingress and egress and public transportation could not outweigh the cost differences assumed that Intervenors' bid included the four acres. Without the four acres, the problems with ingress and egress, congestion and public transportation become even more important and can outweigh minor price differences in rent and energy. This is especially true when one considers the impact that the influx of at least 1000 people would have on an already congested and unsafe area. Put simply, the conclusion that the above factors can and do outweigh price and cost considerations in these facts is not an arbitrary and capricious decision, even though others may disagree with that decision. Instead of reconvening the committee after receiving the recommendation from King Davis and discussing the same with him, the District Administrator made the determination that the lease should be awarded to the Intervenors. The District Administrator, acquiesced in Mr. Davis' assessment that HRS could not succeed in a bid challenge. She did not like his advice. In fact, even at the hearing Ms. Schembera still believed Petitioner's property was the lowest and best for HRS purposes. However, through circular reasoning she also concluded that Intervenors' property was the lowest and best bid because she chose it. The agency's ability to succeed in a bid challenge which may or may not happen is not covered by any of the weighted bid evaluation criteria contained in the bid package and is not an appropriate reason to prefer one bid over another. The foregoing is particularly true when the reason given (surviving a bid protest) is based on the occurrence of a future event which may not occur. To reject a bid for a reason outside the bid criteria and one based on an unknowable future event is an arbitrary and capricious act on the part of Respondent. A court-appointed receiver was ordered to take control of the property belonging to the Petitioner on September 28, 1988, after the bid award was announced. Petitioner still retains its right of redemption of the property, and such an interest is sufficient to confer standing on Petitioner to maintain this action. Moreover, the evidence was clear that Petitioner had both the ability and wherewithal to perform the lease should it receive the bid award. Perfected ownership or control is not required. With Petitioner's apparent ability to perform, the fact of the foreclosure action and the receiver should not work against the Petitioner in this bid protest.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That the Department of Health and Rehabilitative Services enter a final order awarding lease number 590:1987 to Eccelston Properties, Ltd., as the lowest and best bidder. DONE and ORDERED this 10th day of January, 1989, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of January, 1989.

Florida Laws (7) 120.53120.5720.19255.249255.25255.254255.255
# 1
JANUS AND HILL CORPORATION vs PALM BEACH COUNTY SCHOOL BOARD, 94-001622BID (1994)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Mar. 25, 1994 Number: 94-001622BID Latest Update: Aug. 29, 1996

Findings Of Fact In February 1994 the School Board, by and through its design consultants, W. R. Frizzell Architects, Inc., and, more particularly, its project architect, Byron Tramonte, issued plans, specifications, and related contract documents associated with additions, remodeling, and reroofing of John F. Kennedy Middle School, Palm Beach County, Florida. At a pre-bid conference conducted at the project job site attended by representatives of the School Board, its consultants, as well as representatives of Petitioner, Respondent, and Intervenor, among others, Petitioner's Greg Hill questioned the sufficiency of the drawings with respect to the earth work requirements associated with Alternate 1. As a result of this inquiry, the owner's design consultant issued Addendum 2 (including an as-built drawing) dated February 23, 1994, which was ". . . made available for grading estimates." The drawing attached to Addendum 2 had two sets of elevation numbers on it. One set of elevation numbers were underlined. The clearest of the underlined numbers were difficult to read. Many of the underlined numbers were impossible to read. The other set of elevation numbers on the subject drawing were boxed. The boxed numbers were all clear and legible. In view of the purpose for which the drawing was attached to Addendum 2, the most logical interpretation of the drawing was that the boxed elevation figures represented the existing elevations. The drawing attached to Addendum 2 also included some circled handwritten information. In large letters the circled information read: "JFK MIDDLE SCHOOL AS BUILT EXIST. ELEV." Immediately below in smaller letters it read: "Note: The 2 softball fields were not constructed. 2/23/94." The circled handwritten information was to some extent ambiguous. But it was an ambiguity that could be resolved by careful site inspection. Careful site inspection would have revealed that the boxed numbers corresponded to existing site conditions and that the underlined numbers, to the extent they were legible, did not. Petitioner's Vice President Greg Hill was primarily responsible for the preparation of the portion of the Petitioner's bid relating to Alternate 1. Greg Hill visited the job site during the prebid conference and also visited the job site on one other occasion after receiving Addendum 2, but before submitting the Petitioner's bid. Greg Hill is an experienced estimator with respect to matters involving the type of work encompassed by Alternate 1. In spite of his experience and in spite of his two pre-bid site visits, Greg Hill misinterpreted the architect's intent and used the underlined elevations on the drawing attached to Addendum 2 as a basis for estimating portions of the work associated with Alternate 1. As a result of this mistake Greg Hill reached erroneous conclusions about the amount of fill that would be required and substantially overestimated the amount of fill. This mistake caused the Petitioner's bid for Alternate 1 to be somewhat higher than it would have been if Greg Hill had based his estimates on the boxed elevation numbers. A similar mistake was made by CSR Heavy Construction-North, Inc., a company that was seeking work as a subcontractor on Alternate 1. On the last day for submitting bids on the subject project, the Intervenor received an unsolicited bid from CSR Heavy Construction-North, Inc., to perform some or all of the work encompassed by Alternate 1. CSR's bid was much higher than the Intervenor's proposed bid for that work, which caused the Intervenor's President to become worried that perhaps he had misinterpreted the drawings attached to Addendum 2. Intervenor's President called the School Board Architect and asked for confirmation of his interpretation to the effect that the bidders should base their estimates on the boxed elevation numbers on the drawing attached to Addendum 2. The architect confirmed that the Intervenor's President had correctly interpreted the drawing. The architect did not call any other potential bidders to tell them they should use the boxed numbers because he thought it was obvious that all potential bidders should use the boxed numbers. The bids for the subject project were opened on March 3, 1994. The Petitioner was the apparent responsive low bidder for the base bid. The Intervenor was the apparent responsive low bidder taking together the base bid and the bids on Alternates 1 and 2. The School Board published notice of its intent to award a contract to the Intervenor for the base bid and Alternates 1 and 2. The Instructions To Bidders portion of the subject bid specifications included the following provisions: BIDDER'S REPRESENTATIONS: Each Bidder, by making his Bid, represents that he has read and understands the Bidding Documents. Each Bidder, by making his Bid, represents that he has visited the site and familiarized himself with the local conditions under which the Work is to be performed. BIDDING PROCEDURES: * * * 3.11 Familiarity with Laws: The Bidder is assumed to be familiar with all Federal, State and Local Laws, Ordinances, Rules and Regulations, that in any manner affect the Work. Public Contracting and Purchasing Process Florida Statute, Section 287.132-.133 (Public Entity Crimes) is applicable. Ignorance on the part of the Bidder will in no way relieve him from responsibility. * * * AWARD OF CONTRACT: The Contract, if awarded by the Owner, will be awarded to the lowest bona fide responsible Bidder; provided the Bid is reasonable and it is in the interest of the Owner to accept the Bid. The method of determining the lowest bona fide Bid from Bidders shall be the Base Bid price plus or minus Alternate Prices listed on the Bid Proposal Form which are accepted by the Owner. Alternates will be considered for acceptance by the Owner as set forth in the Alternate section of the Specifications, Division One-General Requirements, Section 01030-Alternates. * * * BID PROTEST PROCEDURES: * * * 10.02 The Bid Documents/"Advertisement tol Bid" will be posted in the office of thel Department of Capital Projects at the time of the solicitation to Contractors. Any person who is affected adversely with respect to the Bid Documents shall file a notice of protest in writing within seventy-two (72) hours after the receipt of the Bid Documents, and SHALL FILE A FORMAL WRITTEN PROTEST WITHIN TEN (10) DAYS AFTER THE DATE HE FILED THE NOTICE OF PROTEST. Failure to file a notice of protest or failure to file a formal written protest shall constitute a waiver of proceedings under Chapter 120. It is important to the proper functioning of the public works bidding process that all bidders be treated alike. To this end, important information furnished to one potential bidder should be furnished to all other potential bidders.

Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the School Board enter a Final Order in this case dismissing the protest of the Petitioner and awarding a contract to the Intervenor for the base bid and Alternates 1 and 2. DONE AND ENTERED this 17th day of May 1994 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of May 1994. APPENDIX The following rulings are the specific rulings on all proposed findings of fact submitted by all parties: Findings submitted by Petitioner. Paragraphs 1 through 5: Accepted in whole or in substance. Paragraph 6: Rejected as not completely accurate. The practices described are common, but not universal. Drawings usually have a legend to explain the difference between existing elevations and elevations to be achieved. Paragraph 7: The first sentence of this paragraph is rejected as contrary to the greater weight of the evidence. The remainder is accepted in substance. Paragraph 8: The first sentence of this paragraph is rejected as constituting subordinate and unnecessary details. The last sentence of this paragraph is rejected as constituting inferences or arguments not supported by the greater weight of the evidence. Paragraphs 9, 10, and 11: Accepted in substance, but with some modifications in the interest of clarity and accuracy. Paragraph 12: Rejected as contrary to the greater weight of the evidence. Paragraph 13: Accepted in part. Accepted that if the Petitioner had used the boxed elevation numbers, it's proposal on Alternate 1 would probably have been substantially lower. The remainder of this paragraph is rejected as speculation Paragraph 14: Rejected as not fully supported by competent substantial evidence and as, in any event, subordinate and unnecessary details. Paragraph 15: Rejected as constituting primarily argument, rather than proposed findings of fact. To the extent the material in this paragraph purports to be factual, it tends to be contrary to the greater weight of the evidence. The greater weight of the evidence is to the effect that there were no ambiguities in Addendum 2 that could not have been resolved by careful site inspection. Paragraph 16: Accepted in substance. Paragraph 17: Rejected as constituting subordinate and unnecessary details. Paragraph 18: Rejected as contrary to the greater weight of the evidence; careful site inspection would have confirmed that the boxed numbers represented the existing elevations. Paragraph 19: Accepted. Paragraph 20: Rejected as speculative and as not supported by persuasive competent substantial evidence. Paragraph 21: Rejected as constituting a proposed ultimate conclusion of law, rather than a proposed finding of fact, and as, in any event, a conclusion that is not warranted by the evidence. Findings submitted by Respondent. Paragraphs 1 through 8: Accepted in whole or in substance. Paragraph 9: Rejected as constituting subordinate and unnecessary details. Paragraph 10: Accepted in substance. Paragraph 11: Rejected as constituting subordinate and unnecessary details. Paragraph 12: Rejected as constitution a proposed ultimate conclusion of law, rather than a proposed finding of fact. (The conclusion is warranted, but it is a conclusion nevertheless.) Findings submitted by Intervenor: (No separate proposals; the Intervenor adopted the proposed findings of the Respondent.) COPIES FURNISHED: Robert A. Rosillo, Esquire School Board of Palm Beach County 3318 Forest Hill Boulevard, Suite C-302 West Palm Beach, Florida 33406-5813 Alan C. Brandt, Jr., Esquire Leiby, Ferencik, Libanoff and Brandt Suite 400 150 South Pine Island Road Fort Lauderdale, Florida 33324 Richard B. Warren, Esquire Kelley, Aldrich & Warren, P.A. 801 Spencer Drive West Palm Beach, Florida 33409 Dr. C. Monica Uhlhorn, Superintendent Palm Beach County School Board 3340 Forest Hill Boulevard West Palm Beach, Florida 33406-5869

Florida Laws (2) 120.572.01
# 2
MARPAN SUPPLY COMPANY, INC. vs DEPARTMENT OF MANAGEMENT SERVICES, 96-002777BID (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jun. 11, 1996 Number: 96-002777BID Latest Update: Nov. 26, 1996

The Issue The issue for determination is whether Respondent acted fraudulently, arbitrarily, illegally, or dishonestly in selecting Intervenor as the lowest bidder for a contract to supply the state with lamps valued at $3,692,499.

Findings Of Fact The Parties Respondent is the state agency responsible for soliciting bids to establish a contract for the purchase of large lamps by state agencies and other eligible users. Petitioner is a Florida corporation and the incumbent vendor under similar contracts for the preceding 10 years. Petitioner does not manufacture lamps. Petitioner sells lamps manufactured by Osram-Sylvania ("Sylvania"). Intervenor is an Ohio corporation doing business in Florida. Intervenor manufactures the lamps it sells. The ITB On March 15, 1996, Respondent issued Invitation To Bid Number 39-285- 400-H, Lamps, Large, Photo and STTV (the "ITB"). The purpose of the ITB is to establish a 24 month contract for the purchase of Large Lamps (fluorescent, incandescent, etc.), Photo Lamps (audio visual, projection, flash), and Studio, Theatre, Television, and Video Lamps ("STTV") by state agencies and other eligible users. The contract runs from July 10, 1996, through July 9, 1998. The ITB estimates the contract price at $3,692,499. The ITB contains General and Special Conditions. General Conditions are set forth in 30 numbered paragraphs and elsewhere in DMS Form PUR 7027. Special Conditions are set forth in various unnumbered paragraphs in the ITB. General Conditions Paragraphs 5, 11, and 24 of the General Conditions are at issue in this proceeding. The terms of each paragraph are: 5. ADDITIONAL TERMS AND CONDITIONS: No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and effect and are inapplicable to this bid. If submitted either purposely through intent or design or inadvertently appearing separately in transmittal letters, specifications, literature, price lists, or warranties, it is understood and agreed the general and special conditions in this bid solicitation are the only conditions applicable to this bid and the bidder's authorized signature affixed to the bidder's acknowledgment form attests to this. 11. QUALITY ASSURANCE: The contractor, during the contract term, upon mutual agree- ment with the Division of Purchasing, will provide reasonable travel and lodging accommodations for one (1) to three (3) government employees to perform an on-site inspection of the manufacturing process(es) and review of the manufacturer's product quality control(s) and total quality manage- ment program(s). The contractor will reim- burse the State for actual transportation cost, per diem and incidental expenses as provided in Section 112.061, F.S. It is the State's desire that the contractor provide demonstration of quality control for improvement rather than post production detection. 24. FACILITIES: The State reserves the right to inspect the bidder's facilities at any reasonable time with prior notice. Included Items Special Conditions in the ITB require bidders to submit prices for "Item 1" and "Item 2" lamps ("included items"). 1/ Item 1 lamps consist of Group 1 and 2 lamps. Group 1 lamps are Large Lamps such as fluorescent, incandescent, quartz, mercury vapor, metal halide, and high-pressure sodium lamps. Group 2 lamps are Photo Lamps such as audio visual, projection, flash, and STTV lamps. The total price for each group is multiplied by a weighted usage factor. The product calculated for Group 1 is added to the product calculated for Group 2 to determine the total price for Item 1 lamps. Item 2 consists of a category of lamps described as "T- 10 Lamps." The total price for Item 2 lamps is determined without application of the weighted usage factor used for Item 1 lamps. The total price for Item 2 lamps is a de minimis portion of the contract price. Special Conditions in the ITB require Respondent to award a single contract for included items to a single bidder. Special Conditions state that, "During the term of the contract established by this bid, all purchases of items will be made from the successful bidder." 2/ Excluded Items Special Conditions require that, "The bidder shall offer a fixed discount from retail prices on all excluded items." Excluded items include high technology lamps. The requirement for a fixed discount on excluded items is not considered in evaluating bid prices for included items. Rather, the requirement is intended to reduce the state's cost for both included and excluded items by assuring a meaningful discount on excluded items. Formatting Requirements Special Conditions prescribe the format in which bids must be submitted. Price lists and authorized dealers' lists are required to be submitted in hard copy and on computer diskette. The format prescribed for computer diskette includes requirements for font and graphics. The Special Conditions state that, "Failure to comply with this requirement will result in disqualification of your bid." The Bids The ITB prohibits the alteration of bids after they are opened. Respondent opened bids on April 10, 1996. Seven vendors submitted bids in response to the ITB. Included Items Four vendors, including Petitioner, submitted a bid for both Item 1 and Item 2 lamps. Intervenor and two other bidders did not submit a bid for Item 2 lamps. General Conditions Intervenor deleted paragraphs 11 and 24 of the General Conditions from its bid. At the direction of Intervenor's legal department in Cleveland, Ohio, Intervenor's regional sales manager struck through paragraphs 11 and 24 and initialed the deletions. The deletions are consistent with Intervenor's corporate policy. Intervenor routinely objects to contract provisions requiring inspection of Intervenor's facilities. Excluded Items Petitioner's bid includes a fixed discount of 44 percent on excluded items. Intervenor's bid includes a fixed discount of 0 percent. Formatting Requirements Intervenor included the information required by the ITB on the diskette it submitted with its bid. However, Intervenor supplied the information in Courier 12 characters per inch ("cpi") font, not the Courier 10 cpi font prescribed in the ITB. Proposed Agency Action Respondent determined that Intervenor's bid was responsive. The purchasing specialist for Respondent who reviewed each bid to determine if it was responsive failed to observe the deleted paragraphs in Intervenor's bid. The purchasing specialist forwarded those bids determined to be responsive to the purchasing analyst assigned by Respondent to: determine if the lamps offered in each bid met the specifications prescribed in the ITB; and evaluate bid prices. The purchasing analyst noted that paragraphs 11 and 24 were deleted from Intervenor's bid. The purchasing analyst and purchasing specialist conferred. They determined that paragraph 5 of the General Conditions cured Intervenor's deletions without further action. The purchasing analyst correctly determined: that lamps offered by Petitioner and Intervenor met ITB specifications; that Intervenor's bid is the lowest bid for Item 1 lamps; that Petitioner's bid is the second lowest such bid; and that Petitioner's bid is the lowest bid for Item 2 lamps. Petitioner's bid for Item 1 lamps is approximately five percent greater than Intervenor's bid. Respondent proposes to award one contract for Item 1 lamps to Intervenor. Respondent proposes to award a second contract for Item 2 lamps to Petitioner. At 4:00 p.m. on May 20, 1996, Respondent posted its intent to award the contract for Item 1 lamps to Intervenor. Petitioner timely filed its formal protest on June 3, 1996. Respondent did not award a contract for excluded items. Respondent's failure to award a contract for excluded items is not at issue in this proceeding. Arbitrary Respondent's proposed award of a contract to Intervenor for substantially all of the items included in the ITB is a decisive decision that Respondent made for reasons, and pursuant to procedures, not governed by any fixed rule or standard prescribed either in the ITB or outside the ITB. Respondent's proposed agency action is arbitrary. Excluded Items The requirement for bidders to offer a fixed discount on excluded items operates synergistically with the requirement for Respondent to award a single contract on included items to a single bidder. The combined action of the two requirements operating together has greater total effect than the effect that would be achieved by each requirement operating independently. The requirement for a fixed discount on excluded items, operating alone, may not induce a bidder who could receive a contract solely for Item 2 lamps to offer a discount that is as meaningful as the discount the bidder might offer if the bidder were assured of receiving a contract for Item 1 and 2 lamps upon selection as the lowest bidder. 3/ By assuring bidders that a single contract for Item 1 and 2 lamps will be awarded to a single bidder, the ITB creates an economic incentive for bidders to provide a meaningful discount on excluded items. Respondent frustrated the synergy intended by the ITB by applying the requirements for a fixed discount and for a single contract independently. Respondent penalized the bidder conforming to the requirement for a fixed discount on excluded items by awarding only a de minimis portion of the contract to the bidder. Respondent rewarded the bidder not conforming to the requirement for a fixed discount on excluded items by awarding substantially all of the contract to that bidder. If Respondent elects to purchase all excluded items from Petitioner, Respondent will have used the contract for Item 1 lamps to induce a meaningful discount from Petitioner without awarding Petitioner with the concomitant economic incentive intended by the ITB. Such a result frustrates the ITB's intent. Paragraph 5 Respondent's interpretation of paragraph 5 fails to explicate its proposed agency action. Respondent's interpretation of paragraph 5: leads to an absurd result; is inconsistent with the plain and ordinary meaning of the terms of the ITB; and is inconsistent with Respondent's actions. Respondent's interpretation imbues paragraph 5 with limitless curative powers. Respondent's interpretation empowers paragraph 5 to cure the deletion of all General Conditions in the ITB whether stricken by pen or excised with scissors. Respondent's interpretation of paragraph 5 would transform a bid containing no General Conditions into a responsive bid. Respondent's interpretation of paragraph 5 is inconsistent with the plain and ordinary meaning of its terms. Paragraph 5 operates to cure "additional" terms. It does not operate to restore deleted terms. Respondent's interpretation of paragraph 5 is inconsistent with Respondent's actions. Respondent did not rely on paragraph 5 to cure Intervenor's deletions without further action. Respondent took further action to cure the deletions. Further Action On the morning of May 20, 1996, the purchasing analyst for Respondent telephoned Intervenor's regional sales manager. The purchasing analyst demanded that Intervenor accept the conditions Intervenor had deleted from its bid by submitting a letter of acceptance before the bid tabulations were posted at 4:00 p.m. on the same day. The regional sales manager contacted Intervenor's corporate headquarters in Cleveland, Ohio. Intervenor authorized the regional sales manager to accept the deleted paragraphs. By letter faxed to Respondent at approximately 3:20 p.m. on May 20, 1996, Intervenor accepted the paragraphs it had previously deleted. The letter stated that, "GE Lighting [will accept] the Contract Conditions noted in Paragraphs 11 and 24 of the Lamp Quotation." [emphasis not supplied] At 4:00 p.m. on May 20, 1996, Respondent posted the bid tabulation form. The bid tabulation form stated that the "award is contingent upon General Electric's acceptance of all the terms in conditions (sic)" in the ITB. Respondent argues that the purchasing analyst who contacted Intervenor on the morning of May 20, 1996, exceeded her authority. Respondent characterizes the word "contingent" in the bid tabulation form as "poorly written" and a "bad word." Agency Construction Of ITB Terms Respondent construes terms in the ITB in a manner that is inconsistent with their plain and ordinary meaning. The ITB requires that, "The bidder [shall] offer a fixed discount from retail price list on all excluded items." [emphasis supplied] Respondent interprets the quoted provision as meaning the bidder may offer such a fixed discount if the bidder elects to do so. The purpose of the ITB is to establish "[a] 24 month contract" to supply large lamps to the state. [emphasis supplied] Respondent interprets the quoted provision as meaning that the purpose of the ITB is to establish two contracts. The ITB states that, "During the term of the contract established by this bid, all purchases of items [will] be made from [the] successful bidder." [emphasis supplied] Respondent interprets the quoted provision as meaning that purchases of some items will be made from one successful bidder and that purchases of other items will be made from a second successful bidder. The ITB states that the contract "[shall] be made statewide on an all or none basis" to the responsive bidder who satisfies the conjunctive requirements for: "[the] lowest "Award Figure Item (1; [and] lowest Award figure for Item (2." [emphasis supplied] Respondent interprets the quoted provision as meaning that separate contracts may be made statewide on less than an all or none basis to separate responsive bidders who satisfy the disjunctive requirements for either the lowest bid for Item 1 lamps or the lowest bid for Item 2 lamps, or both. The ITB requires offers to be submitted for all items listed within a group for a bid to qualify for evaluation. Respondent interprets the requirement as meaning that a bidder who does not qualify for evaluation for all of the groups in the contract nevertheless qualifies for evaluation for the contract. Finally, the ITB states that failure to comply with the formatting requirements for the diskette "[will] result in disqualification of your bid." [emphasis supplied] Respondent interprets the quoted language to mean that failure to comply with prescribed formatting requirements may result in disqualification of a bid. The interpretations of the quoted terms proposed by Respondent, individually and collectively, frustrate the purpose of the ITB. They also ignore material requirements of the ITB. Material Deviation Respondent deviated from the rule or standard fixed in the ITB in several respects. First, Respondent altered the bid evaluation procedure prescribed in the ITB. Second, Respondent ignored the requirement to award a single contract to a single bidder. Third, Respondent ignored the requirement that bidders provide a fixed discount on excluded items. Fourth, Respondent ignored the requirement to comply with the formatting requirements prescribed in the ITB. Each deviation from the rule or standard fixed in the ITB is a material deviation. Each deviation gives Intervenor a benefit not enjoyed by other bidders. Each deviation affects the contract price and adversely impacts the interests of Respondent. 4/ 5.5(a) Benefit Not Enjoyed By Others Intervenor enjoyed a benefit not enjoyed by other bidders. Intervenor obtained a competitive advantage and a palpable economic benefit. Respondent altered the bid evaluation procedure prescribed in the ITB. On the morning of May 20, 1996, Respondent disclosed the bid tabulations to Intervenor alone, 5/ gave Intervenor an opportunity that lasted most of the business day to determine whether it would elect to escape responsibility for its original bid, allowed Intervenor to cure the defects in its bid, accepted Intervenor's altered bid, and conditioned the bid tabulations on Intervenor's altered bid. Respondent used a bid evaluation procedure that is not prescribed in the ITB and did not allow other bidders to participate in such a procedure. 6/ In effect, Respondent rejected Intervenor's initial bid, with paragraphs 11 and 24 deleted, and made a counter offer to Intervenor to accept a bid with paragraphs 11 and 24 restored. Intervenor accepted Respondent's counter offer. Respondent excluded other bidders from that process. Respondent gave Intervenor an opportunity to determine whether it would elect: to escape responsibility for its original bid by declining Respondent's counter offer; or to perform in accordance with an altered bid by restoring paragraphs 11 and 24. A bidder able to elect not to perform in accordance with its bid has a substantial competitive advantage over other bidders unable to escape responsibility for their bids. 7/ Respondent awarded substantially all of the contract to Intervenor even though Intervenor failed to provide a meaningful discount on excluded items. Respondent provided Intervenor with a palpable economic benefit. 5.5(b) Bid Price And Adverse Impact On The State Respondent did not award a contract for excluded items. Respondent's proposed agency action allows Respondent to purchase excluded items from either Intervenor or Petitioner. If Respondent were to purchase all of the excluded items it needs from Intervenor, Respondent could pay substantially more for excluded items than Respondent would save from the five percent price advantage in Intervenor's bid for Item 1 lamps. In such a case, Respondent's proposed agency action would effectively increase costs to the state that are inherent, but not stated, in the ITB. 8/ Conversion of incorrectly formatted data to the required font shifts prices to incorrect columns and causes other problems in accessing information in the diskette. Such problems can not be rectified easily but require substantial time and effort. Responsive Bidder Respondent did not award the contract intended by the ITB to the lowest responsive bid. Although Intervenor's bid is the lowest bid for Item 1 lamps, it is not the lowest responsive bid for Item 1 and 2 lamps. Petitioner's bid is the lowest responsive bid for Item 1 and 2 lamps. 9/ Respondent is statutorily required to award the contract to the lowest responsive bidder. 10/ Illegal Intervenor's bid is not responsive within the meaning of Sections 287.012(17), Florida Statutes (1995). 11/ It does not conform in all material respects to the ITB. Intervenor's unaltered bid deletes paragraphs 11 and 24. It does not include a fixed discount on excluded items, does not include a bid for Item 2 lamps, and does not conform to the formatting requirements in the ITB. Section 287.057 requires Respondent to award the contract to the bidder who submits the lowest responsive bid. Respondent has no authority either: to consider bids that are not responsive; or to award the contract to a bidder other than the lowest responsive bidder. Respondent's attempt to engage in either activity is ultra vires and illegal. Minor Irregularities The ITB encourages, but does require, bidders to include quantity discounts for Item 1 and 2 lamps. Petitioner's bid does not include quantity discounts. Petitioner's bid does not fail to conform to material requirements in the ITB. Petitioner does not manufacture Item 1 and 2 lamps. Sylvania manufactures the lamps Petitioner sells. Petitioner has no legal right to require Sylvania to allow inspection of its facilities pursuant to paragraph 11 of the General Conditions. Petitioner's ability to provide the requisite inspections requires the cooperation of Sylvania. Petitioner's bid requires payment by the state within 30 days of an invoice. Section 215.422 and the ITB provide that Respondent has 40 days to issue warrants in payment of contract debts and that interest does not accrue until after 40 days. The defects in Petitioner's bid are minor irregularities within the meaning of Florida Administrative Code Rule 60A-1.001(16). 12/ They neither affect the bid price, give Petitioner a competitive advantage, nor adversely impact Respondent's interests. Petitioner has the practical ability to arrange inspection's of Sylvania's facilities. Petitioner is legally responsible for failing to do so. Respondent's employees have never visited Sylvania's facilities during the 10 years in which Petitioner has been the contract vendor to the state. The requirement for payment within 30 days does not obviate the provisions of Section 215.422. Private contracts can not alter mutually exclusive statutory provisions.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order granting Petitioner's protest of Respondent's proposed agency action. RECOMMENDED this 26th day of September, 1996, in Tallahassee, Florida. DANIEL S. MANRY, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of September, 1996.

Florida Laws (6) 112.061120.57215.422287.001287.012287.057 Florida Administrative Code (1) 60A-1.001
# 3
PHILIP J. PROCACCI AND WHARTON INVESTMENT GROUP, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, DONALD J. CERLANEK, AND SUZANNE CASEY, 90-002459BID (1990)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Apr. 24, 1990 Number: 90-002459BID Latest Update: Sep. 27, 1990

The Issue The issues are 1) Whether the Department of Health and Rehabilitative Services (HRS) properly rejected all bids on Lease Bid No. 590:2133, and 2) Whether either Petitioner is entitled to award of Lease Bid No. 590:2133 as the lowest and best responsive bidder.

Findings Of Fact On October 16, 1989, HRS issued an Invitation to Bid (ITB) on Lease Bid No. 590:2133 for 43,634 net square feet of office space in Ocala, Marion County, Florida. The bid package contained specifications, evaluation criteria, and numerical weight to be assigned to each criteria. The bid package indicated the area of emphasis placed on the facility by HRS which focused on client safety, public access, availability of public transportation, and parking. The emphasis on each area was indicated by the weighted points to be given in each area. On January 24, 1990, HRS received bids from both Wharton and Curtis. Both bids were responsive. Curtis submitted the apparent low bid and Wharton submitted the apparent second lowest bid. Curtis, as Trustee, is the owner of the property which is presently occupied by HRS in Ocala, Florida. The lease on these premises was awarded in 1980 and expires in 1990. Curtis purchased the leasehold in April of 1988 while HRS was a tenant and subject to the existing lease. Philip J. Procacci is the President of Procacci Development which is the general partner in Wharton Investment Group. The actual bids submitted were not offered into evidence by any party in this proceeding. Susanne Casey, the District Administrator of HRS District 3, is ultimately responsible for the leasing of all HRS facilities in the district, including facilities in Marion County. Casey appointed a bid evaluation committee to review and evaluate the responsive bids based on the criteria stated in the bid package. The committee was to make a recommendation regarding the lowest and best bidder. Before the bids were opened, the bid evaluation committee met and agreed upon objective parameters for each of the evaluation criteria. These parameters established standards against which each committee member could independently evaluate and award points on each bid. The evaluation criteria in the bid package assigned points in three major categories: associated fiscal costs, location, and facility. Associated fiscal coasts were further broken down into (a) rental rates for the basic lease term, (b) rental rates for optional renewal terms, and (c) associated moving costs. The maximum points available in each of these categories were fixed in the bid package and could not be altered by the committee. These criteria are standard in a lease procurement through out the state. State regulations require that all bids for lease space in the state evaluate rental rates using present value methodology. See Rule 13M-1.029, Florida Administrative Code. This means that the proposed rental rates in all bids are calculated to present value dollars for the purpose of comparison. The Department of General Services has a computer program, the sole function of which is to calculate the present value of the rental rates. The program has nothing to do with the assignment of points under the criteria, but is used as a tool to allow comparison of the bids. The present value of the Curtis bid was $662,464 lower than the present value of the Wharton bid. The rental rates were awarded points under criterion 1a of associated fiscal costs. The committee awarded the full 20 points to Curtis and awarded 5 points to Wharton. The committee members awarded these points in accordance with the standards and formula they had agreed on prior to the bid opening. The formula the committee used was not the more commonly used formula, but it was reasonable and rational and it was fairly applied to the bids in this case. There is no rule or policy of HRS or of the Department of General Services (DGS) that mandates that a particular formula be used in awarding points for the rental rate criterion 1a. There is a formula that HRS and DGS recommend as guidance of a methodology that is appropriate and reasonable, but the recommendation is not binding on the committee or on the District Administrator. There was another criterion of associated moving costs considered as part of the associated fiscal costs. Each committee member awarded 10 points to Wharton and 8 points to Curtis on this item. Wharton received 10 points because it sent a letter with its bid in which it offered to pay all moving costs incurred by HRS in a move to its building. Curtis received 8 points because HRS already occupied two of its buildings and would have limited moving costs in moving into the two additional buildings included in its bid. The bid specifications and bid package contained no indication that a bidder could offer to pay all moving costs as part of its bid. In fact, Wharton submitted its letter offering to pay all moving costs as a result of its discussion with one committee member, T.C. Little. Mr. Little is also the General Services Manager for HRS District 3 and is involved with all bids in the district. Mr. Little interpreted the bid specifications to permit such an offer even though the bid specifications were silent on the issue. At page 5 of the bid package, it is clearly stated that questions concerning the bid are to be directed to the project contact person. It further states: Any questions which might be prejudicial to other bidders will be answered in writing in the form of a clarification to the bid and will be sent to all prospective bidders. On that same page, the bid specifications address proposal of alternatives by stating: For evaluation purposes each bid submitted will be evaluated as to adherence to the specifications requested. If a bidder desires to propose alternatives to the specified specifications, he/she may do so by attaching a sheet to the bid submittal document titled Alternatives. However, these alternatives will not be presented to the bid evaluation committee for use in comparison of bids and can only be considered after an award of bid is made. The project contact person was Donald J. Cerlanek and any request for clarification should have been addressed to him and not to Mr. Little. Mr. Little's gratuitous advice and interpretation of the bid specifications made to Wharton and not to all bidders was incorrect, violated the terms of the bid specifications, and was improper. The bid specifications do not permit an offer to pay all moving costs to be considered in the award of points under the associated moving costs criteria. Such an offer can only be considered as an alternative proposal and cannot be considered by the bid evaluation committee in comparing the bids. Under the standards established by the committee, Wharton should have received 5 points on the associated moving costs criterion instead of 10 points. The committee members individually evaluated each bid and awarded points within the parameters they had established. Except for the incorrect award of points on the associated moving costs criteria, the scoring method and award of points by each committee member was rationally and reasonably related to the relative importance of each criterion as established in the bid package and was neither arbitrary nor capricious. Each committee member came to the conclusion that the Curtis bid was the lowest and best based on the award of points in each member's independent evaluation. On February 13, 1990, they recommended in writing that Curtis be awarded the bid. On February 19, 1990, the District Administrator adopted the committee's recommendation and reported the recommendation to Steven Gertel, the assistant staff director for HRS Facilities Services in the Office of General Services. On March 7, 1990, Mr. Gertel sent a memo to the District Administrator. The memo said: Review of the bid evaluation committee's recommendation has disclosed that the committee used a non-standard method of evaluating present value of rental rate for the lease term. Please provide an explanation of this variation to accepted practice. In fact, the committee used the established DGS formula to calculate the present value of rental rates. However, the committee used its own formula to award points based on the present value of rental rates. There was nothing impermissible about the committee's actions or formula. Because of a fear of a bid protest, Ms. Casey, the District Administrator, sent a notice rejecting all bids on the project. No other reason was articulated for rejecting all bids. The fear of a bid protest is not a legally sufficient reason to reject all bids, particularly because it is not stated in the bid specifications and is based on speculation about a future event which may never occur. HRS did reserve the right to reject all bids in the bid package, but it may not do so for an improper purpose. Fear of a bid protest is not a proper purpose. Wharton alleged and attempted to show some level of collusion between Curtis and Mr. Cerlanek of HRS. While Mr. Curtis had several contacts with Mr. Cerlanek about the project, such contacts are not per se inappropriate because Mr. Cerlanek is the District 3 Lease Coordinator and is the proper person to discuss future projects with potential bidders. No competent, substantial evidence was presented to show that Mr. Cerlanek discussed anything that was not public record or anything that gave Mr. Curtis any advantage in the bid process. Mr. Cerlanek did not tell Mr. Curtis what would be in the bid package or what would be needed to insure award of the bid to Curtis.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health and Rehabilitative Services enter a Final Order awarding the bid in Lease No. 590:5133 to Gail Curtis, as Trustee, as the lowest and best bidder. DONE and ENTERED this 27th day of September, 1990, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of September, 1990. APPENDIX TO THE RECOMMENDED ORDER IN CASE NOS. 90-2459BID AND 90-2666BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Wharton 1. Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2-4(5) and 19(27). 2. Proposed findings of fact 1, 5, 11-17, 20, 29, 30, 38, 39, 45, 46, 51, and 57 are subordinate to the facts actually found in this Recommended Order. 3. Proposed findings of fact 6, 8-10, 18, 21, 24, 25, 27, 31-34, 37, 40-44, 48- 50, 52, and 55 are irrelevant. Proposed findings of fact 7, 28, 56, 58, and 59 are unsupported by the competent, substantial evidence. Proposed findings of fact 22, 23, 26, 35, 36, 38, 47, 53, and 54 are mere summaries of testimony and are not appropriately framed as proposed findings of fact. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Curtis, as Trustee Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 4(11), 7&8(13), 9(14), and 15(25). Proposed findings of fact 1-3, 5, 6, 10-12, and 16-26 are subordinate to the facts actually found in this Recommended Order. Proposed findings of fact 13, 14, and 27-29 are unnecessary. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Department of Health and Rehabilitative Services Each of the following proposed findings of fact is adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: Part I paragraphs 2(1&2), 3(4), 4(8), 5(30), Part II paragraphs 2(1&2), 3(3), 4(4), 5(8), 6(9), 8(10), 19(25), and 20(26). Proposed findings of fact Part I paragraphs 1 and 6 and Part II paragraphs 1, 7, 9, 10, 12-18, and 21-24 are subordinate to the facts actually found in this Recommended Order. Proposed finding of fact 11 is irrelevant. Copies furnished to: Robert A. Sweetapple Attorney at Law 465 East Palmetto Park Road Boca Raton, FL 33432 Harry R. Detwiler, Jr. Attorney at Law Holland & Knight Post Office Drawer 810 Tallahassee, FL 32302 Gloria Fletcher Attorney at Law 515 North Main Street, Ste. 300 Gainesville, FL 32607 Frances S. Childers District Legal Counsel Department of HRS 1000 Northeast 16th Avenue Gainesville, FL 32609 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (3) 120.53120.57255.25
# 4
CHD MARKETING GROUP AND NORLAKE, INC. vs PALM BEACH COUNTY SCHOOL BOARD, 92-003135BID (1992)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 22, 1992 Number: 92-003135BID Latest Update: Dec. 14, 1992

Findings Of Fact Respondent issued an invitation to bid on March 13, 1992. Bid number SB 92-244I involved the disassembly and removal of an existing walk-in freezer and the furnishing and installation of a new walk-in freezer at Coral Sunset Elementary School. The invitations to bid provided in paragraph Y of the Special Conditions: Failure to file a specification protest within the time prescribed in Florida Statutes 120.53 3.(b) shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. (sic) Bid specifications were included in the invitations to bid issued on March 13, 1992. Twenty-three bids were solicited. There were five responses. One of the responses was submitted by Choice Restaurant Equipment, Inc. ("Choice"). Choice is a vendor for equipment manufactured by Petitioner, Nor-Lake, Inc. ("Nor-Lake"). Nor-Lake is an out-of-state corporation with manufacturer's representatives in numerous states including Florida. 4, Petitioner, CHD Marketing Group ("CHD"), is the manufacturer's representative for Nor-Lake in Florida. CHD represents no other manufacturer of the product included in the bid response. Choice is a sales agent for CHD and other manufacturer's representatives in Florida. Choice sells the products of a variety of manufacturers but is the exclusive sales agent for CHD pursuant to a verbal agency agreement. Choice timely submitted a bid for bid number SB 92-244I on April 8, 1992, prior to the bid deadline of 2:00 p.m. on the same day. The successful bidder submitted its bid by Federal Express at 4:51 p.m on April 8, 1992. Respondent's Department of Purchasing and Stores (the "Department") had stated on March 13, 1992, when the invitations to bid were issued, that bid responses must be received by the Department no later than 2:00 p.m. on April 8, 1992, at the Department's address at 3980 RCA Boulevard/Suite 8044, Palm Beach Gardens, Florida, 33410-4276. Prior to April 8, 1992, the Department relocated to a new facility at 3326 Forest Hill Boulevard, West Palm Beach, Florida. The new address was posted at the old location and Department representatives were present at the old address to accept walk-in bids. Federal Express first attempted to deliver the successful bid at the Department's old address at 10:30 a.m. on April 8, 1992. Federal Express delivered the successful bid to the Department's new address at 4:51 p.m. At 2:00 p.m. on the same day, The Department announced that all bids were in and opened the bids that had been delivered. The successful bid and one other bid were delivered on April 8, 1992, after the public opening conducted at 2:00 p.m. on the same day. Bids were tabulated on April 9, 1992. Bid tabulations were posted on April 13, 1992, and the successful bid was announced. The successful bid was for $8,174.00. Three bids were lower than the successful bid. Choice's bid was for $7,742.56. The other two lower bids were for $8,020.00 and $6,620.00. All three lower bids were rejected as non- responsive. Choice's bid was rejected because it did not meet bid specifications for 22 gauge steel, thermostatically controlled door heaters, and reinforced steel door panels. CHD filed a Notice of Protest on April 14, 1992, and a Formal Written Protest on April 24, 1992. CHD's protest alleges that: Choice's bid was lower than that of the successful bidder; the successful bid was not timely made; the bids were not opened publicly in violation of bidding procedure requirements; and the bid specifications were arbitrary and capricious, favored one bidder, and that Choice's bid was responsive. Neither a notice of protest nor a formal written protest was submitted by Choice or Nor-Lake. Neither Choice nor Nor-Lake attended the informal protest conference conducted on April 30, 1992. On May 7, 1992, Respondent's Office of General Counsel issued its written notice of proposed agency action. The written notice recommended that the bid be awarded to the successful bidder and that CHD's protest be dismissed for lack of standing. CHD requested a formal hearing on May 14, 1992, and the matter was referred to the Division of Administrative Hearings for assignment of a hearing officer on May 15, 1992. The bid submitted by Choice was prepared by CHD but signed by the president of Choice. Neither Nor-Lake nor CHD signed a bid or were otherwise bidders of record for bid number SB 92-244I. Neither Choice, CHD, nor Nor-Lake, filed a notice of protest concerning the bid specifications within 72 hours after Choice received the notice of the project plans and specifications on March 13, 1992. The sole basis upon which CHD claims it is substantially affected is the adverse economic impact caused to it by the proposed agency action. The proposed agency action will result in lost sales from this and future transactions. CHD will lose commissions from this and future transactions. The dealer relationship between CHD and Choice will be damaged because Choice will not want to sell a freezer that is not acceptable to Respondent. The marketing strategy developed between CHD and Nor-Lake will be damaged because it is conditioned upon the award of public contracts.

Florida Laws (1) 120.53
# 5
GLOBAL MARKETING OF NORTH CAROLINA vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-002222F (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 08, 1991 Number: 91-002222F Latest Update: Aug. 09, 1991

Findings Of Fact Respondent issued an Invitation To Bid (ITB) for Bid No. 91-04, entitled "Granular Activated Carbon (GAC) Filter Installations and Exchanges" in September, 1990. Two bids were received in response to Respondent's ITB 91-04; one from Petitioner for a composite total price of $748,355.00 and one from Continental Water Systems, Inc. (Continental), for a total composite price of $904.475.00. An intended contract award was delayed until the bids were evaluated. Subsequently, Respondent determined to award the bid to Continental on October 12, 1990. The issue in the ensuing bid dispute in Division of Administrative Hearings Case No. 90-6962BID was the responsiveness of Petitioner's bid on carbon specifications to be used in water filters. The bid document did not require manufacturers' specifications, requiring instead only generic specifications or a description of the product to be used. Respondent awarded the bid to Continental after determining Petitioner's bid to be nonresponsive, although the bid appeared facially responsive. In the course of evaluating the bids, Respondent's personnel went beyond the bid submissions and telephoned the manufacturer of the carbon proposed to be used in Petitioner's bid submittal. The manufacturer confirmed the content of Petitioner's bid that a lot analysis and hand selection could be done to select lots of carbon of a specified iodine number of 950 or greater in satisfaction of Respondent's specifications. Absent such a selection process, no manufacturer in this country produces a standard carbon which meets Respondent's bid specifications. While the ITB required bidders to submit specifications for products, it did not require submission of manufacturer's specifications. However, Petitioner's bid submittal included the manufacturer's specification sheet for an activated charcoal product known as GAC 30. The iodine number 950 appeared on the sheet with an asterisk next to it. At the bottom of the page was a typed note explaining that lots with this iodine rating would be specifically selected to meet or exceed all bid requirements. In reviewing Petitioner's bid, Respondent's personnel were aware that Petitioner had been using selected lots of GAC 30 in fulfilling a previous bid award for the same project from the Department of Agriculture and Consumer Services which specified carbon with an iodine number of 950. Further, Respondent's personnel knew that lot analyses were provided to the Department of Agriculture and Consumer Services to confirm the carbon's standards. As a result of that knowledge, a provision for an analysis of each carbon lot to be used was included in Respondent's ITB. On October 9, 1990, when Respondent's employee telephoned the manufacturer whose specification sheet was submitted by Petitioner, he was orally informed that while the iodine number for GAC 30 is 900, the actual iodine number for GAC 30 is often above 950 and that lot selections of carbon could be made meeting or exceeding 950. Later, per the employee's request for written confirmation, he received a facsimile letter dated October 10, 1990, from the manufacturer. Without regard for these findings, Respondent rejected Petitioner's bid because the actual manufacturer's specification for the carbon proposed by Petitioner did not meet bid requirements. 1/ While Respondent's personnel deemed it appropriate to consider information from the manufacturer of GAC 30 that its actual specifications were different from those submitted by Petitioner, the manufacturer's confirmation of Petitioner's explanation that lots would be selected to meet bid requirements was rejected. Petitioner is a corporation which, at the time of the bid submittal, had its principal office in Winter Haven, Florida. At that time, Petitioner had 12 employees. Petitioner is a prevailing small business party and was awarded the bid by Final Order of Respondent dated February 18, 1991. In the course of the administrative litigation culminating in Respondent's Final Order, Petitioner incurred attorney's fees in excess of $15,000.

Florida Laws (3) 120.57120.6857.111
# 6
COS AND PALMER CONSTRUCTION COMPANY AND OVERLAND CONSTRUCTION COMPANY vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 85-002044BID (1985)
Division of Administrative Hearings, Florida Number: 85-002044BID Latest Update: Jul. 09, 1985

Findings Of Fact Based on the stipulations and admissions of the parties, on the exhibits received in evidence, and on the testimony of the witnesses at hearing, I make the following findings of fact. The South Florida Water Management District (hereinafter "District") advertised for bids on Contract No. M-0137, Bid No. B-85-91, for the construction of a structure maintenance facility. The Specifications and Contract Documents for the project required that bidders submit a "Base Bid," which related to the essential components of the project, and three "add alternates," which related to additional items that the District might contract for over and above the Base Bid. The Notice To Contractors regarding this project included the following language: The right is reserved, as the interest of the District may require, to reject any or all proposals, to waive any informality in the proposal, or to readvertise for other or future proposals. Paragraph 2 of the Instructions To Bidders includes the following language: "The intent of the Proposal Form is to secure a price, based on unit prices, for the work described in the Contract. . . ." (emphasis added) Paragraph 4 of the Instructions To Bidders reads as follows: The District reserves the right to reject any and all proposals (i) when such rejection is in the interest of the District; (ii) if such proposal is void per se; or (iii) if the proposal contains any irregularities, PROVIDED, however, that the District reserves the right to waive any irregularities and to accept the lowest responsible bidder's proposal determined by the Engineer on the basis of the gross sum for which the work will be performed, arrived at by a correct computation of the base bid plus the alternate bid item or items selected by the District. Bid items will be considered by the District on the has is of budgetary capability. (First emphasis in original; second emphasis added.) Paragraph 5 of the Instructions To Bidders reads as follows: Proposals will be considered irregular if they show omissions, unauthorized alterations of form, additions not called for, conditional or unauthorized alternate bids, or other irre- gularities of any kind; also if the unit prices are unbalanced either in excess of or below the reasonable cost analysis values, or incomplete in any manner, including failure to bid on all items on the bid form. Paragraph 8 of the Instructions To Bidders reads as follows: No proposal can be withdrawn after it is filed unless the Bidder makes his request in writing to the District prior to the time set for the opening of bids, or unless the District fails to accept it within sixty (60) days after the date fixed for opening bids. Paragraph 10 of the Instructions To Bidders reads as follows: No interpretation of the meaning of the Plans, Specifications or other Contract Documents will be made to any Bidder orally. Every request for such interpretation should be in writing addressed to the Engineering & Construction Division, South Florida Water Management District, 3301 Gun Club Road, Post Office Box V, West Palm Beach, Florida, zip code 33402, and to be given consideration must be received at least Ten (10) calendar days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written Addenda to the Specifications which, if issued, will be mailed by registered mail to all prospective bidders (at the respective addresses furnished for such purposes) not later than Five (5) calendar days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such Addendum of interpretation shall not relieve any bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents. The bid items are described in Section 01021 of the Specifications and Contract Documents. Subsection 1.01 of that Section describes what is included in the Base Bid as follows: The Base Bid includes all work shown on the plans and called for in the specifications for: Structure Maintenance Facility, complete. Building utilities including all rough-in required for alternate bid items whether or not alternate bids are accepted. Site work including utilities. All other costs of the project not attributable to Items 1 thru 3 above or Alternate Bid Nos. 1 thru 3 below. Subsection 1.02 of Section 01021 describes what is included in Alternate Bid No. 1 as follows: In the Base Bid all structural supports to receive the monorail trolley beams and hoists are included. Alternate No. 1 includes all work shown on the plans and called for in the specifications for two 15 ton capacity monorail hoists and trolley beams complete and operational. Work includes all final utility connections to points indicated on drawings, shipping, unloading at site, installation and final check-out and instruction to owner on operation of equipment as well as all other costs not attributable to items previously mentioned. Subsection 1.03 of Section 01021 describes what is included in Alternate Bid No. 2 as follows: In the Base Bid all mechanical and electrical rough-in is to be provided for the two offices and the toilet and locker rooms above. Alternate No. 2 includes all costs over the Base Bid for completing the offices, toilets and locker rooms including all plumbing and lighting fixtures, partitions, lockers finishes, structure and metal stair as indicated and specified in the applicable sections of these specifications. Subsection 1.04 of Section 01021 describes what is included in Alternate Bid No. 3 as follows: The Base Bid includes all site grading to finish elevations indicated. Alternate No. 3 includes all costs over the Base bid for providing subsurface preparation and asphaltic concrete paving to finish elevations indicated as described in Section 02513 for all areas where asphaltic concrete paving is shown. In September of 1984 the District had received bids for a similar project. Similar contract documents and bid forms were used for the project. Cox & Palmer Construction Company, Overland Construction Company, Inc., and Booth Construction, Inc., all submitted bids on the September 1984 project. All of the bids submitted on the September 1984 project, including the Booth bid, were submitted on an add alternates" basis. All of the September 1984 bids were rejected. A total of seven bidders submitted bids on the instant project. With the exception of Booth Construction, Inc., all of the bidders on the instant project calculated their bids on an "add alternates" basis. It was the clear intent of the architecture firm that prepared the Specifications and Contract Documents that the bids should be submitted on an add alternates" basis. There were no irregularities in the bidding process regarding the instant project prior to the opening of the first bid. At the duly appointed time a representative of the District began the process of opening and announcing the amounts of the bids. The first bid to be opened was the bid submitted by Overland Construction Company, Inc. The amounts bid by Overland were as follows: Base Bid $ 378,800 Alternate No. 1 64,000 Alternate No. 2 18,000 Alternate No. 3 11,200 Immediately after the announcement of the amounts bid by Overland, Mr. York, the Director of the District's Engineering and Construction Division, asked, "Is that an add-on or deduct?" Someone in the audience answered that it was an "add-on" bid. Mr. Gerachi, on behalf of Booth, promptly stated that the alternates should have been bid as "deducts". A general discussion ensued among members of the audience regarding whether the alternates should have been bid as "add-on" or "deducts." In order to continue with the bid opening process and to restore order in the room, a representative of the District announced that the matter would be resolved when the bids were tabulated and another representative of the District began the process of opening the rest of the bids. The bid submitted by Booth Construction, Inc., was the fourth bid to be opened. The amounts written on the Booth bid were as follows: Base Bid $ 396,586 Alternate No. 1 54,072 Alternate No. 2 14,597 Alternate No. 3 9,185 Immediately after the amounts of the Booth bid were announced, Mr. Alvin Booth, president of Booth Construction, Inc. stood up and stated that the Booth bid had been calculated on the basis of "deduct" alternates. The essence of his statement was that in calculating the amount of his company's Base Bid he had added to the base bid the sum of the three alternate bids with the understanding that the amounts shown for any of the three alternates would be deducted from his Base Bid if the District decided not to award a contract for one or more of the alternates. This statement following the opening of the Booth bid was the first time that anyone on behalf of Booth had made a specific unambiguous statement to representatives of the District responsible for this bidding process regarding the manner in which the Booth bid was calculated. 1/ The bid submitted by Cox & Palmer Construction Company was opened after the Booth bid. The amounts bid by Cox & Palmer were as follows: Base Bid $ 392,225 Alternate No. 1 38,770 Alternate No. 2 19,200 Alternate No. 3 11,456 The bid submitted by Booth Construction, Inc., was prepared by both Vincent Gerachi, an estimator and project manager employed by Booth Construction, Inc., and by Alvin Booth, president of Booth Construction, Inc. Mr. Gerachi has been an estimator on construction projects for approximately 12 years. Mr. Booth has been in the construction business for approximately 30 years and has had his own construction company for about 18 years. Both Mr. Gerachi and Mr. Booth were uncertain whether the alternate bids were supposed to be bid as "add-ons" or as "deducts." Neither of them attempted to do anything to resolve their uncertainty until the morning of the very day on which bids were to be submitted. On that morning Mr. Gerachi called a representative of the District to ask whether the bid should be prepared with the alternate bids calculated as "add-ons" or as "deducts." Mr. Gerachi spoke to Mr. Brown at the District, who suggested that Mr. Gerachi call the architecture firm that had prepared the Specifications and Contract Documents. Notwithstanding the provisions of Paragraph 10 of the Instructions To Bidders (see paragraph 6 of these findings of fact, above), it is a customary practice of the trade for bidders to communicate directly with project architects to resolve any uncertainties in the Specifications and Contract Documents. Indeed, it is generally understood in the trade that it is the duty of the bidder to communicate with the project architect to seek resolution of any ambiguities. Mr. Gerachi tried to reach the project architect by telephone, but was unable to reach him because the architect had already left his office to drive to the bid opening. Mr. Gerachi did not have an opportunity to talk to the architect prior to filing the Booth Construction bid because the architect did not come into the bid opening room until about one minute after 2:00 p.m. Mr. Gerachi talked to Mr. and Mrs. Booth before turning in the Booth bid. Mr. Gerachi prepared the Booth bid with the alternate bids calculated as "deducts" from the Base Bid. In other words, the amount of the Base Bid on the Booth bid included the sum of the three alternate bids, which alternate bids were also separately stated on the Booth bid. Alvin Booth participated in the preparation of the bid and was aware of the manner in which the Booth bid was calculated before the bid was submitted to the District. Even though the Base Bid on the Booth bid is in the amount of $396,586, it was the intention of Booth Construction, Inc., to bid $318,732 for the work described as being within the scope of the Base Bid. The reason for the higher amount being entered for the booth Base Bid is that Vincent Gerachi and Alvin Booth misinterpreted the Specifications and Contract Documents and added to the Booth Base Bid the sum of the Booth bids on each of the three Alternate Bids. 2/ This misinterpretation of the Specifications and Contract Documents was caused by the culpable negligence or willful inattention of Vincent Gerachi and Alvin Booth. After all of the bids were opened a representative of the District announced that the District would consider the matter and notify all bidders of its decision at a later date. Thereafter the District, having concluded that Booth Construction, Inc., had acted in good faith and that the irregularities in the form of its bid were "minor irregularities," decided to treat the oral statements by Mr. Gerachi and Mr. Booth as amendments to the Booth bid, to treat the Booth Base Bid as being $318,732, and to award a contract to Booth Construction, Inc., for the Base Bid and Alternate No. 1 in the amount of $372,804, calculated as follows: $318,732 (Amended Booth Base Bid) 54,072 (Booth Alternate No. 1 Bid) $372,804 (Total Contract) Booth Construction, Inc., has the ability to perform the contract and can perform the contract for the proposed contract amount of $372,804. Booth Construction, Inc., is a responsible bidder. The District estimate of the cost of the work covered by the Base Bid and Alternate No. 1 was $329,000. There are no irregularities in the bid submitted by Cox & Palmer Construction Company. Cox and Palmer Construction Company is a responsible and responsive bidder. The bid submitted by Cox & Palmer is the lowest responsive bid for the combination of the Base Bid and Alternate No. 1. 3/ The foregoing findings of fact include the substance of the majority of the findings proposed by the parties, although I have rejected a number of unnecessary details and editorial comments in the parties' proposals. Any proposed findings which are not incorporated in the foregoing findings are rejected on the grounds of not being supported by competent substantial evidence or as being contrary to the weight of the persuasive evidence.

Recommendation Based on all of the foregoing, I recommend that the South Florida Water Management District enter a Final Order to the following effect: Concluding that the irregularities in the Booth Construction, Inc., bid may not be waived and that the bid will be considered, as submitted, to be a Base Bid in the amount of $396,586; Concluding that in view of the foregoing treatment of the Booth bid, the bid of Palmer & Cox Construction Company is found to be the lowest responsive bid for the Base Bid plus Alternate No. 1; Concluding that the District will accept the bid of Palmer & Cox Construction Company and enter into a contract with Palmer & Cox Construction Company consistent with the amounts bid by Palmer & Cox Construction Com- pany for the Base Bid and Alternate No. 1; and Concluding that the petition of Overland Construction Company, Inc., is dismissed for lack of standing. DONE AND ORDERED this 9th day of July, 1985, at Tallahassee, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of July, 1985.

Florida Laws (4) 1.011.021.04120.57
# 7
KARL HEDIN vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 91-007314BID (1991)
Division of Administrative Hearings, Florida Filed:Vero Beach, Florida Nov. 14, 1991 Number: 91-007314BID Latest Update: Apr. 20, 1992

The Issue Whether Petitioner/Intervenor Hedin's challenge to Respondent's preliminary determination to award Lease No. 590:2241 to 1436 Building, Inc. should be sustained? Whether Petitioner/Intervenor Schlitt's challenge to said preliminary determination should be sustained?

Findings Of Fact Based upon the record evidence, the following Findings of Fact are made: 1 In March, 1991, after requesting and receiving approval from the Department of General Services, the Respondent issued an Invitation to Bid for Lease No. 590:2241 (hereinafter referred to as the "ITB"). The cover page of the ITB contained the Bid Advertisement, which read as follows: The State of Florida, Department of Health and Rehabilitative services is seeking approximately 17,064 net rentable square feet of office space to lease in Indian River County within the following boundaries: North, to Lindsey Road, South to Olso Road, East to A1A and West to Kings Highway. Space must be in an existing building. Occupancy no later than October 1, 1991, or within 120 days after notification of bid award, whichever occurs last. Desire a five (5) year lease with five (5) one year renewal options. Sealed bids will be received until 3:30 p.m.,, April 24, 199[1] at Riviera Beach, FL. Information and specifications will be provided to all interested parties at a mandatory pre-proposal conference to be held at Department of Health and Rehabilitative Services, 1050 15th Street West, Riviera Beach, FL. 33404, April 5, 1991 at 1:00 p.m. The Department of HRS reserves the right to reject any and all bids received and if necessary to reinstate procedures for soliciting competitive bids. The office space sought by Respondent was to house a client service center that is currently operating out of a 12,000 square foot facility owned by Petitioner/Intervenor Hedin. Respondent needs approximately 5,000 more square feet of office space for this center. Page B-1 of the ITB contained the definitions of various terms used in the ITB. Among the terms defined was "lowest and best bid." "Lowest and best bid" was defined as follows: That bid selected by the District Administrator, designee, or Deputy Secretary upon the recommendation of the bid evaluation committee following an objective and detailed process to evaluate and compare bids. "Lowest" refers to the total evaluation score. Weights for evaluation criteria are prescribed on pages B-7 through 9. Actually, this information was found on pages B-5 though 7 of the ITB, which read in pertinent part as follows: EVALUATION OF BIDS Bids received are first evaluated to determine technical responsiveness, such as use of Bid Submittal Form, inclusion of required information, data, attachments, and signatures. Non- responsive bids will be withdrawn from further consideration. Non-responsive bidders will be informed promptly by certified mail. Responsive bids are presented to a bid evaluation committee for comparison and formulation of a recommendation for award. This is accomplished by a visit to each proposed property and application of the evaluation criteria. The committee's recommendation will be presented to the Department official having award authority for final evaluation and determination of a successful bidder. EVALUATION CRITERIA AWARD FACTORS The successful bidder will be that determined to be the lowest and best. All bids will be evaluated based upon the award factors enumerated below: Associated Fiscal Costs Rental Rental rates for basic term of lease. Evaluated using present value methodology by application of she present value discount rate of 8.74%. 2/ (Weighting: 35 minimum) Rental rates for optional renewal terms of lease. Rates proposed are within projected budgeting restraints of the Department. (Weighting: 5 minimum) Total for rental shall be not less than 40. Moving Costs: a) Cost of relocating communications network computer drop lines as determined by a site survey conducted at each proposed facility by the Department's management information office, or: (Weighting: 5 maximum) b) Cost of relocation of major statewide operational data system as determined by a site survey conducted at each proposed facility by qualified data center management. (Weighting: 6 maximum) Telephone costs as determined by a site survey conducted at each proposed facility by an engineer from the applicable deregulated vendor. (Weighting: 5 maximum) Relocation of furniture and equipment not addressed above. (Weighting: 5 maximum) LOCATION The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of Departmental operations planned for the requested space. Proximity of facility to a preferred area, such as a courthouse or main traffic arteries. (Will not be applicable if there are no preferred areas within the bid boundaries). (Weighting: 5 maximum) Frequency and availability of satisfactory public transportation near the offered space. (Weighting: 5 maximum) Proximity of offered space to the clients to be served by the Department at this facility. (Weighting: 5 maximum) Aesthetics of the building, property the building site [is] on, and of the surrounding neighborhood. (Weighting: 1 maximum) Security issues posed by building and surrounding neighborhood. (Weighting: 1 maximum) PROPERTY Susceptibility of the property's design to efficient layout and good utilization, such as ability of physical structure to house large units together and in close proximity to interdependent units. (Weighting: 15 maximum) Suitability of the building, parking area and property as a whole for future expansion. (Weighting: 5 maximum) Provision of the aggregate square footage in a single building. Proposals will be considered (but fewer points given) which offer the aggregate square footage in not more than two buildings provided the buildings are immediately adjacent to or within 100 yards of each other. If in separate buildings, the structures are connected by enclosed climate controlled walkways. (Weighting: 2 maximum) Prospective bidders were instructed on page B-3 of the ITB that they had to submit their bids on the 22-page Bid Submittal Form, which comprised Section C of the ITB. The Bid Submittal Form (BSF) provided detailed information regarding the needs of the Department and the terms, conditions and requirements that prospective bidders were expected to meet. Among the requirements addressed was that the proposed space be an "existing building," meaning that it was "dry, fully enclosed, and capable of being physically measured." The BSF further indicated that a multistory building would be acceptable, provided that it met certain specified requirements. In addition, pages C-3 through 4 of the BSF informed prospective bidders that, as part of their bid submittal, they would have to provide, among other things, the following: * * * b. A scaled (1/16" or 1/8" or 1/4" 1'0") floor plan showing present configurations with measurements. The final floor plan will be described in the specifications. * * * A scaled site layout showing present location of building(s), location, configuration and number of parking spaces assigned to the Department, access and egress routes and proposed changes. This is to be drawn to scale. Final site layout will be a joint effort between Department and Lessor so as to best meet the needs of the Department. The subject of floor plans was also discussed on page C-11 of the ITB, which provided in pertinent part as follows: Final floor plans will be a joint effort of Departmental staff and the successful bidder. The successful bidder is to provide architectural services by a licensed architect to prepare renovation plans. The final floor plan is subject to Departmental determination and State Fire Marshal review and approval. 3/ Prospective bidders were issued the following advisement and warning on page B-8 of the ITB regarding their protest rights: Any person may dispute any part of the competitive bid process through the filing of a protest. To be considered, a protest must be filed in accordance with Section 120.53(5), Florida Statutes, and Chapter 10-13.11 Florida Administrative Code. Failure to file a protest within the prescribed time limits shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Prospective bidders, who did not want to file a protest, but merely desired clarification regarding a matter relating to the bidding process, were directed, on page B-3 of the ITB, to follow the following procedure: Any questions concerning an interpretation of meaning, ambiguity, or inconsistency on this project are to be received in writing by the project contact person listed on page A-1 [Steven Young) at least 5 working days prior to bid opening so that a written response may be provided to all bidders. 4/ The mandatory pre-proposal conference on the ITB was held as scheduled on April 5, 1991. Petitioner/Intervenor Schlitt, Petitioner/Intervenor Hedin, and Intervenor 1436 Building, Inc. (hereinafter referred to as "`1436") appeared in person or through a representative at the conference. One other prospective bidder, Alan Taylor, was also in attendance. Among the topics discussed at the pre-proposal conference was the present value index discount rate that would be applied in evaluating proposals. The prospective bidders were advised that the rate which appeared on page C-21 of the ITB-- 7.73%--, not the 8.74% rate appearing on page B-5, would be used. Prospective bidders were also told at the pre- proposal conference that the maximum number of total points available for moving costs was not 15 or 16 as a reading of the ITB might suggest, but 21: 5 for item 1)a) (computer drop lines);6 for item 1)b) (statewide operational data system equipment); 5 for item 2 (telephones); and 5 for item 3 (furniture and other equipment). Under the ITB, as originally issued and clarified at the pre-proposal conference (hereinafter referred to as the "Original ITB"), Respondent was to pay its own moving costs, as it had consistently done in the past, without any contribution on the part of the successful bidder and it would award points to each bidder for moving costs based upon what it would cost Respondent, according to its estimates, to relocate computer drop lines, statewide operational data system equipment, telephones, and furniture and other equipment to the facility proposed by that bidder. The less the expense to the Department to relocate these items, the more points a bidder would receive. Accordingly, to the extent that he intended to offer space already occupied by Respondent, Petitioner/Intervenor Hedin had an advantage over the other prospective bidders under the Original ITB. Some time after the pre-proposal conference, David Feldman, 1436's representative, complained to Respondent about this advantage enjoyed by Hedin in the category of moving costs and inquired if anything could be done about it. Steven Gertel, the Respondent's Assistant Staff Director for Facilities Services, Kevin McAloon, the General Services Manager for Respondent's District IX, Louis Consagra, the then Office Operations Manager for General Services for District IX, and Steven Young, the Facilities Services Manager for District IX and the contact person referenced in the ITB, discussed the matter during a telephone conference call held on April 11, 1991. During their discussion, it was decided that it would be in the best interest of the Department, which was operating under severe fiscal constraints, to change the ITB to allow prospective bidders to essentially buy points by agreeing to pay all or a portion of Respondent's estimated moving costs. Such a change, it was thought, would enhance the competitiveness of the bidding process. Before making the change, however, Respondent attempted to quickly estimate what its costs would be if it had to relocate computer drop lines, statewide operational data system equipment, telephones, and furniture and other equipment to another facility in Indian River County within the geographical boundaries prescribed in the ITB. Respondent estimated that it would cost between $25,000 and $30,000 to relocate computer drop lines and statewide operational data system equipment, $35,000 to $45,000 to relocate telephones and $8,000 to $10,000 to relocate furniture and other equipment. In arriving at these estimates, Respondent relied upon agency personnel who, because of their experience, expertise and/or access to contracts with vendors and other pertinent documents, appeared to be reliable sources of information. On April 12, 1991, the day after the telephone conference call and twelve days before the scheduled bid opening, Facilities Services Manager Young, on behalf of the Department, sent by United States Certified Mail, return receipt requested, to all four prospective bidders who attended the mandatory pre- proposal conference on April 5, 1991, the following memorandum: Page C-22 of the Bid Submittal Form has been changed and is enclosed for use in the Invitation to Bid. Please call me if you have any questions on this change/addition or any information that is needed to complete your Bid Submittal on or before 3:30 p.m., April 24, 1991. The "changed" page C-22 of the ITB, which accompanied the foregoing memorandum, provided as follows with respect to moving costs: The bidder will respond to the items as stated in the Bid submittal,, Page B-6, b. Moving Costs: 1) a) b), 2), 3). Department Bidder Estimate Response 1) a) b) $25,000 to $30,000 2) $35,000 to $45,000 3) $8,000 to $10,000 Young also telephoned each of the four prospective bidders and explained to them how moving costs would be evaluated in light of this revision to the ITB. He told them that if they indicated under "Bidder Response" on page C-22 that they would be willing to pay up to $30,000 for item 1, $45,000 for item 2 and $10,000 for item 3, and in Hedin's case, provided he submitted a bid that included the 12,000 square feet of space presently occupied by Respondent, 28% of these amounts, they would capture the maximum number of points available for each of these items, and that if they indicated a willingness to contribute less than these amounts, they would be awarded points in proportion to amount of their proposed contribution. 5/ Respondent's decision to allow Hedin to earn the same amount of points as the other prospective bidders for moving costs by pledging to contribute only 28% of what his competitors had to pledge was based upon square footage considerations. If a bidder other than Hedin was awarded the lease, Respondent would have to move into more than 17,000 square feet of space. If, on the other hand, Hedin submitted a bid that included the 12,000 square feet of space presently occupied by Respondent and he was the successful bidder, Respondents would be occupying only 5,000 or so square feet of space it had not previously occupied, or approximately 28% of the square footage that it would have to move into if the lease had been awarded to another bidder. The ITB, as so revised and clarified by Respondent (hereinafter referred to as the "Revised ITB"), contemplated that the successful bidder would be obligated to pay only Respondent's actual moving costs up to the amounts pledged on page C-22 of the bidder's completed BSF. Moving costs in excess of the amounts pledged by the successful bidder would be borne by Respondent. Respondent wanted to avoid a situation where, because of Respondent's estimating errors, a successful bidder: was forced to bear a cost in connection with its bid that it did not anticipate at the time it had submitted the bid. Respondent, however, was quite confident that the estimates it had made and incorporated in the Revised ITB would not prove to be too low. 6/ All four of the prospective bidders who participated in the mandatory pre-proposal conference submitted timely bids. Each of bids was deemed to be responsive. Facility Services Manager Young then performed the calculations necessary to determine the number of points that each bidder should be awarded for associated fiscal costs, including rental costs and moving costs. This was purely an objective and non-judgmental exercise. Young performed these calculations in accordance with the methodology that had been described to all of the bidders prior to the submission of their bids. Schlitt had the lowest rental rates for the basic term of the lease, as well as for the five option years. Accordingly, he was awarded the maximum 35 points for the former and the maximum 5 points for the latter, for a total of 40 points. The scores received by the other bidders for rental costs were as follows: 1436- basic term: 34.125, and option years: 4.340; Hedin- basic term: 28.865, and option years: 3.710; and Taylor- basic term: 31.938, and option years: 4.575. Schlitt and 1436 indicated on page C-22 of their completed BSFs that they were each willing to pay up to $30,000 for the relocation of computer drop lines and statewide operational data system equipment, up to $45,000 for the relocation of telephones and up to $10,000 for the relocation of furniture and other equipment. Accordingly, they were both awarded the maximum 21 points for moving costs. Hedin indicated on page C-22 of his completed BSF that he was willing to pay up to 28% of these amounts ($8,400.00 for the relocation of computer drop lines and statewide operational data system equipment, $12,600 for the relocation of telephones and $2,800 for the relocation of furniture and other equipment). Accordingly, he too was awarded the maximum 21 points for moving costs. Taylor, who indicated on page C-22 of his completed BSF a willingness to contribute only a small fraction of the Respondent's estimated moving costs, received a total of 1.667 points for moving costs. After computing these scores 7/ Young prepared a written synopsis of all four bids that had been submitted. He gave copies of his synopsis to the four members of the bid evaluation committee, along with score sheets for them to use in their evaluation of these bids. Typed in on each score sheet were the scores the bidders had received for rental costs and moving costs. These scores were accurately reported on the score sheets except for the score that Hedin had been awarded for rental costs associated with the basic term of the lease. The score sheets erroneously indicated that Hedin had been awarded 32.375 points, rather than 28.665 points, for this item. The four members of the bid evaluation committee were: General Services Manager McAloon; Frank Mueller, District IX's chief financial officer; and Kathy Pelaez and Alfred Swanson, two HRS administrators who supervise staff headquartered in Respondent's Indian River County client service center. 8/ Young, because he was the Facilities Services Manager, was prohibited by agency practice 9/ from serving on the bid evaluation committee. The bid evaluations committee visited each of the bidder's proposed facilities before determining the amount of points to award them for the non- economic categories, i.e., location and property, set forth in the Revised ITB. The committee members visited Schlitt's, 1436's and Taylor's proposed facilities on the same day. They subsequently paid a visit to Hedin's proposed property, which consisted of the building presently occupied by Respondent, plus an addition of approximately 5,000 square feet connected to the existing building by a walkway. The delay in visiting Hedin's proposed facility was the result of a determination, later overturned, that the entire facility was not dry and measurable as required by the Revised ITB. Following their visits to Schlitt's, 1436's and Taylor's proposed facilities, the members of the bid evaluation committee met as a group and discussed each of these proposed facilities. They had a similar meeting and discussion about Hedin's proposed facility after their visit to that proposed facility. Applying the criteria set forth in the Revised ITB, the committee members agreed that the following point awards should be made for the categories of location and property: location/proximity to preferred area (evaluation criterion 2.a., 5 point maximum)- Schlitt: 3, 1436: 2, Hedin: 5, and Taylor: 1; location/public transportation (evaluation criterion 2.b., 5 point maximum)- all four bidders: 0; location/proximity to clients (evaluation criterion 2.c., 5 point maximum)- Schlitt: 3, 1436: 2, Hedin: 5, and Taylor: 1; location/aesthetics (evaluation criterion 2.d., 1 point maximum): Schlitt, 1436, and Hedin: 1, and Taylor: 0; location/security (evaluation criterion 2.e., 1 point maximum)- all bidders: 1; property/design (evaluation criterion 3.a., 15 point maximum)- Schlitt: 9, 1436: 15, Hedin: 14, and Taylor 10; property/future expansion (evaluation criterion 3.b., 5 point maximum): Schlitt: 4, 1436: 5, Hedin 3.5, and Taylor 3, and property/square footage in single building (evaluation criterion 3.c., 2 point maximum)- Schlitt, 1436, and Taylor: 2, and Hedin: 1. Each of the members of the evaluation committee then recorded these scores on their individual score sheets. Although they agreed to each award the same number of points, evaluation committee members were free to do otherwise. They were not subjects to any threats or coercion. The members of the evaluation committee made a good faith effort to fairly base their point awards on the evaluation criteria for the categories of location and property prescribed in the Revised ITB. For instance, they awarded Schlitt only nine out of a possible 15 points for property/design because of their reasonable concerns that the space he offered, which was located in a multistory building which would have other tenants in addition to the Department, would not be able to house large units together and in close proximity to interdependent units. The committee members did not have similar concerns about the space offered by 1436. Accordingly, they awarded 1436 the maximum 15 points for this category. The points awarded by the evaluation committee for location and property were added to the points the bidders had previously received for rental and moving costs to obtain a total point award for each bidder. The; results were as follows: 1436- 87.465 total points; Schlitt- 84 total points; Hedin- 83.875 total points; and Taylor- 56.18 total points. 1436's bid was therefore the "lowest and best bid," as defined on page B-1 of he Revised ITB. Consistent with the Revised ITB's pronouncement that "[t]he successful bid will be that determined to be the lowest and best," the evaluation committee recommended to the District IX Administrator that 1436 be awarded Lease No. 590:2241. General Services Manager McAloon, in his capacity as chairman of the evaluation committee, provided the District IX Administrator with a written justification for the committee's recommendation. 10/ The committee's recommendation, as well as its written justification, were adopted by the District IX Administrator, who, by letter dated October 3, 1991, to 1436, gave notice of the Department's intention to award 1436 Lease No. 590:2241. Copies of this letter were sent to all bidders. The Department's preliminary decision to award the lease to 1436 was the product of, not any fraudulent, arbitrary, capricious or unlawful conduct on the Department's part, but rather the honest exercise of the agency's discretion. After receiving their copies of the District IX Administrator's October 3, 1991, letter to 1436, Schlitt and Hedin filed protests and initiated the instant proceedings.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Health and Rehabilitative Services enter a final order awarding Lease No. 590:2241 to 1436 over the protests of Schlitt and Hedin. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 24th day of February, 1992. STUART M. LERNER Heading Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of February, 1992.

Florida Laws (5) 120.53120.54120.57255.2556.18
# 8
TOWNSEND SHEFFIELD AND UNDERWOOD VENTURES vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES AND DEPARTMENT OF GENERAL SERVICES, 84-000402 (1984)
Division of Administrative Hearings, Florida Number: 84-000402 Latest Update: Sep. 05, 1984

Findings Of Fact This case concerns what is called a "turnkey lease." The program was developed by the State of Florida in 1971. It encompasses a situation whereby agencies seeking space for their operation may, after a specific need is determined that cannot be filled by existing adequate space, solicit competitive bids from developers for the provision of land and the construction of a building there sufficient to meet the agency's needs, for lease specifically to the agency requesting it. The Bureau of Property Management within DGS was given the initial responsibility to develop the guidelines, promulgate the rules, and seek statutory authority for such a program. The Bureau's current role is to work with agencies requesting this program. The agency certifies the need to the Bureau, in addition to the fact that there is no available existing space present. The Bureau then determines agency needs and gives the agency the authority to solicit the bids for the turnkey project. Once the bids have been solicited and the preproposal conferences have been held, the bids are then received, evaluated, and a recommendation for an award is forwarded by the agency to the Department of General Services. DGS reviews the supporting documents required by the provisions of the Florida Administrative Code and either concurs or does not concur in the recommendation. If DGS concurs, the submitting agency is notified and is permitted to then secure the lease. Once the lease has been entered into, it is then sent back to DGS for review and approval, as to the conditions, and thereafter the plans and specifications for the building are also referred to DGS for review and approval as to the quality and adequacy of the plans and specifications and code compliance. Section 255.249 and Section 255.25, Florida Statutes, sets forth the requirement for soliciting and awarding bids for lease space in an amount in excess of 2500 square feet. This provision requires that an award of this nature be made to the lowest and best bidder, and DGS subscribes to that standard in evaluating and determining whether or not it will concur with an agency's recommendation. In the instant case, DHRS advertised for bids for the construction of office space in Palatka, Florida for its District III facilities. Before seeking to solicit bids, District III staff conducted a search for other possible existing space within a five mile radius of the downtown area and located no adequate facilities. Thereafter, a certification of need was processed for a solicitation of proposals and approval was granted by DGS to follow through with the solicitation. A preproposal conference was advertised and held on October 14, 1983 and after review by those present at the conference, bid opening date was set for November 22, 1983. Thirty-two bid packages were distributed and twelve bidders submitted proposals. The public bid opening was held as scheduled at 2:00 P.M. on November 22, 1983, in Palatka, Florida by Robert E. Litza, Facilities Service Coordinator for DHRS District III. Of the bids submitted by the twelve bidders, the lowest bid was rejected because of the failure of the bidder to comply with the requirements of the bid package. Of the remaining eleven bids, the four lowest were evaluated with the understanding that additional high bids would be evaluated if the four lowest were found to be unacceptable. Among the four bids considered were bids of Chuck Bundschu, Inc.; Kenneth McGunn, the Intervenor (Mr. McGunn submitted five price schedules for his bid and of these only one was considered); Elizabethan Development, Inc.; and TSU. A recommendation by the evaluation committee which met at DHRS District III that Intervenor's bid be selected was forwarded to DGS in Tallahassee through the Director of DHRS's General Services in Tallahassee on December 22, 1983. The terms of the successful bid and the reasons for its being considered lowest and best are discussed below. The successful bid for the lease in question, lease number 590:8030, was, upon completion of the committee's evaluation, also evaluated by Mrs. Goodman in the Bureau of Property Management of DGS. She also considered the McGunn bid as the lowest and best of the eleven non-disqualified bids. In that regard, not only Mr. McGunn's bid but all of the twelve bids received were considered and reviewed not only at the local level but at DHRS and DGS Headquarters as well. In her evaluation of the proposal and the bids, Mrs. Goodman considered the documentation submitted by DHRS. This included a letter of recommendation supported by a synopsis of all proposals, the advertisements for bids, and any information pertinent to the site selection process. The letter from DHRS dated December 22, 1983, which recommended award of the lease to Mr. McGunn, included Mr. Litza's December 21, 1983 analysis and recommendation letter which, itself, was attached to McGunn's primary bid documents. Her analysis did not include a prior award recommendation and analysis from Mr. Litza, dated December 8, 1983. It also did not include the site plan, the floor plan for the proposed building, or a survey of the site, but these areas are considered to be within the discretion of the leasing agency. Their absence is not considered to be particularly significant. In her analysis, Mrs. Goodman found that Petitioner's bid was also responsive. However, comparing it with Mr. McGunn's bid, she and her staff found that the latter was the lowest bid submitted. The determing factor in her decision was cost. In determining that McGunn's bid was the lowest as to cost of all bids, Mrs. Goodman compared the average rate per square foot per year for each. This did not take into consideration proration of costs per year, but strictly the average over the fifteen years of the term of the lease (10 year basic plus 5 year option) . According to Mrs. Goodman, this same method of calculating cost has been used in every lease involving a turnkey situation and in fact in every lease since 1958 - as long as she has been with DGS. This particular method, admittedly, is not set forth in any rule promulgated by DGS. However, the agencies are instructed by DGS to advertise and bidders to bid on an average square foot basis, the basis utilized by Mrs. Goodman and her staff in analyzing the bids submitted. In that regard, the request for proposals does not, itself, indicate how the calculation of lowest cost would be made by DHRS and DGS but it does tell prospective bidders what information to submit. This procedure has been followed exclusively in situations like this for many years and many of the bidders have bid before using this same system. While Mrs. Goodman is not certain whether TSU has ever bid before, using this system, she does not consider it to be unfair because all bidders are considered on the same footing in an evaluation. They are notified of what information to submit and if they do so, their information will be considered along with all other bidders. Further, anyone who inquires as to the basis for evaluation will be given a straight and complete answer as to the method to be used. In the instant case, DHRS followed procedure for solicitation and evaluation utilized in the past and DGS followed its own policy in evaluating the submissions. In short, the primary consideration for DGS is the price factor and all other factors are considered to be within the expertise of the requesting agency. In Mrs. Goodman's opinion, based on the fact that she worked with the Florida Legislature on the development of the controlling statute, and helped develop the existing rule within DGS, that was the intent of the Legislature. Consequently since the statute requires award to the lowest and best bidder, it can be said that in this case the term "lowest" falls within the purview of both DHRS and DGS but "best" is solely within the purview of DHRS. Therefore, utilizing the lowest and best criteria and accepting the fact that the lowest bid may not be the best bid, the determination of "non-best" should be based on the reasonable "end objective" of the agency and need not be based on a criterion which is set forth in the bid proposal. In other words, it is not necessary for the agency to set forth the manner of evaluation it will use or the factors it will consider, according to Mrs. Goodman. With regard to the bid and evaluation committee process, Mr. Litza, the facilities manager for DHRS in Gainesville, was involved in putting together the bid package along with Mr. George Smith from Tallahassee, Litza's predecessor in the job in Gainesville. He worked with Mr. Smith in order to take advantage of Smith's experience in evaluating bids for leases. So far as he knew, the bid package contained minimum standards for all parts of the bid, and the package was, in fact, approved by officials in Tallahassee before being released. While no particular factors were identified to prospective bidders as being significant, Mr. Litza did conduct a bid conference for them prior to the date the bid was due and was available to answer any questions that prospective bidders might have. He did not receive any questions regarding the significance of any particular factor from any bidder. The bids were advertised and when received, were opened and read properly in accordance with the terms of the solicitation. When the bids were received and opened, it was seen that Mr. McGunn had submitted five different bids for the same project. Litza had not been confronted with this situation before and asked Mr. Smith what to do about it. Mr. Smith's reply was to put all five McGunn bids in with the rest and extract the lowest five of all bids. When this was done, Mr. McGunn was shown to have submitted two of the lowest five bids. In determining which were the lowest five bids, Mr. Litza utilized the average cost per square foot formula utilizing therein the entire 15,772 square feet authorized for the project. Once the five lowest bids were determined, Mr. Litza selected an evaluation committee made up of local Palatka DHRS supervisors except for the fiscal member, Mr. Foust, Mrs. Shinholster, Litza's secretary and Litza himself. He gave each of the members a score sheet with point values for each area. Each member filled out the form independently. Though he gave very little briefing to the evaluation committee, he admits that he did, in advance, tell each member that Mr. McGunn was the lowest bidder and should be awarded the highest points for criteria number 1, which related to cost. There were several irregularities in Mr. Litza's processing of the evaluation committee's results. For example, on the evaluation of the file conducted by member Sheryl Dollar, regarding criteria number 2, which relates to the conformity of space offered to the specific requirements contained in the invitation to bid (with a weight of 25 points), Mr. Litza admitted he lowered Mrs. Dollar's point award in that area from 35 to 25 without first checking with her to insure that his action would meet with her approval. While this is irregular, it is of little or no consequence since - the maximum number of points that could be given for that particular item was 25 and Mr. Litza's actions did not reduce that member's award to less than the maximum allowable. He contends that his action was based on what he considered to be a mistake on her part. In another apparent irregularity, Mr. Litza prepared a recommendation letter based on his and the other committee members' evaluation of the files to DHRS Headquarters in Tallahassee on December 8, 1983. In that letter, be indicated that McGunn would provide gas heat for the proposed building for free. Though McGunn had not specifically stated this, he implied it from the energy features paragraph in the Intervenor's bid. On the other hand, the bid by TSU contained an express comment offering to pay the utility charges. This specific provision was overlooked and omitted from the evaluation and report to Tallahassee by Litza, who contends that this omission was merely an oversight. There are other discrepancies as well. In his testimony, Mr. Litza indicated Mr. McGunn proposed to build one building but his letter of December 8th and that of December 21, 1984, both reflect two buildings. Here again, Mr. Litza explains this as the result of his being confused. Nonetheless, this erroneous information was referred to Mrs. Goodman at DGS. This is significant in that at the evaluation committee meeting, when the forms were given out, several of the members expressed a preference for a two-building complex. After the award, Mr. Litza secured agreement from McGunn to build two buildings. Mr. Litza admits that much of this was done in an attempt to insure that McGunn, as the low bidder, got the award. Mr. Litza equated the lowest bid with the best and had Petitioner been the low bidder, he contends he would have done the same thing. In most areas, he would not, however, have given Petitioner's four-building concept a high score because of the increased heat and air requirements of four buildings. Mr. Litza also downgraded Petitioner on that bid criteria which relates to the proximity of offered space to the clients to be served because Petitioner's site, he contends, was too close to the clients to be served. In this case, a housing project for low income families which make up much of the clientele to be served by DHRS, was located across the street from the proposed site offered by the Petitioner. Mr. Litza contends that he was thinking of the potential damage to the building because of increased activity by virtue of the facility being so close. There were other questionable areas in Mr. Litza's testimony. For example, he testified that though Petitioner provided 15 more parking spaces than Intervenor, this would result in mud being tracked in from the adjacent dirt road 200 feet away in greater quantities than in Intervenor's proposal. He also considered positively that the Intervenor's proposed site was closer to a restaurant than that of the Petitioner. Though it was recommended by DHRS Headquarters in Tallahassee that only two of the committee members be from the Palatka office, Mr. Litza disregarded that advice because, he contends, there was a morale factor in that office and the people assigned there wanted to have a part in this decision. Because of this, he allowed Ms. Stouffenberg to put five extra members of her staff on the committee. Nonetheless, the evaluation committee serves only in an advisory capacity. Its recommendation is no more than an advisory opinion. The ultimate decision as to which of the bidders should be awarded the contract is made at DHRS Headquarters in Tallahassee. Ms. Shinholster, a Clerk IV in the DHRS Gainesville office, who works as a secretary to Mr. Litza and several others, was advised she would be on the committee for the evaluation at the same time she was given the bid file. She did not get an opportunity to meet with other committee members to talk about the standards to be used, nor was she given any standards by which to evaluate the files. All she was told by Mr. Litza was that McGunn was the lowest bidder. She cannot explain how she accorded points on her evaluation sheets except that she gave the low bidder the highest number of points. Mr. George Smith, a Senior Analyst with DHRS in Tallahassee, relied on Mr. Litza's input when he made his recommendation to his superiors that the award should be made to McGunn. He also formulated his own opinion, based on his own analysis of the bids. He resolved any dispute regarding cost in favor of Mr. McGunn on the basis of the average rental, and regarding space, in favor of McGunn on the basis of the number of buildings. Dr. Perry, an economist with the University of North Florida, testified to the Federal Government's policy regarding the desirability of using the present value of money methodology and the determination of an acceptable discount rate or index in calculating the actual cost of the bids. Both experts, Dr. Perry and Dr. Scott, who testified for DGS, agree that the present value methodology is valid and presents a more accurate analysis of cost than the average rental cost methodology which does not utilize this theory. The major difference between the two was primarily in the percentage to be utilized in applying the discount rate. Whereas Dr. Perry adopted the Federal policy and suggested a 10 percent discount rate, Dr. Scott testified that a more viable percentage rate in November, 1983, at the time the award was to be made, would have been 3.3 percent. If the 10 percent rate were used, then the Petitioner's bid would be the lowest of all submitted. On the other hand, if the 3.3 percent rate were used, Intervenor's bid would be the lowest. If a different discount rate, that of 5.7 percent were to he used, the bid of Elizabethan Development Corporation would be low. It is at about the 6 percent point and above that Petitioner's bid becomes the lowest. Nonetheless, the State has not adopted the present value of money theory and the policy followed by the State is not to consider that methodology in analyzing costs. State policy is to use only the average rental methodology. There are no written instructions (rules) on evaluating bids for leases of this nature. Oral instructions given by DGS to each agency are that the average rate per square foot is to be computed using, if the square footage is constant, for each year of the lease, the basic square footage requested, multiplied by the rental rate proposed for each year of the basic lease, divided by the number of years. If the square footage is not constant in every year of the lease, evaluators are directed to apply the rate per square foot proposed in each year to the square footage to be utilized in that year, total up the annual rentals, total up the square footage involved, and divide to arrive at the average rate per square foot per year. Utilizing one or the other of those two methods in evaluating both the McGunn and the TSU bids, it becomes clear that the McGunn bid results in an average of $8.86 cost per square foot per year and the TSU bid an average of $9.58 per square foot per year. Recalculation of DHRS' evaluation by DGS showed the DHRS' figures as stated above were correctly arrived at. This procedure is followed on all turnkey and non-turnkey leases in the State of Florida. The reason the State uses this process instead of the present value of money process is because it is easy. DGS statistics indicate that most landlords in the approximately $32,000,000 worth of leases presently existing with the State are "Mom and Pop" landlords. These people are not normally trained lease evaluators. By using the straight average rental rate method, there are no arbitrary variables. It has always worked because people can understand it and all agencies which lease property in the State of Florida follow this procedure. Also, this procedure does not require computer-based calculations, and it does not require economists to work with it. Both latter reasons are amplifications of the first. In Mrs. Goodman's estimation, if the present value of money system were to be adopted, her division would have to hire at least two $30,000 per year economists and buy an in-house computer to operate the system. This additional cost, she believes, would far outweigh the paper savings to be realized by utilizing the present value of money system. As of the hearing date, considering all the factors, in Mrs. Goodman's opinion, DGS would nonetheless still recommend Mr. McGunn's bid as the lowest and best bid.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore RECOMMENDED that DHRS lease Number 590:8030 be awarded to Kenneth R. McGunn. RECOMMENDED this 5th day of September, 1984, in Tallahassee, Leon County, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of September, 1984. COPIES FURNISHED: Donald E. Holmes, Esquire William E. Townsend, Jr., Esquire Post Office Drawer D Palatka, Florida 32078-0019 James A. Sawyer, Jr., Esquire District III Legal Counsel Department of Health and Rehabilitative Services 1000 Northeast 16th Avenue Gainesville, Florida 32609 Stephen J. Kubik, Esquire Department of General Services Room 452, Larson Building Tallahassee, Florida 32301 H. Allen Poll, Esquire 112 South Main Street Gainesville, Florida 32601 Linda C. McGurn, Esquire 1717 Northeast 9th Avenue Gainesville, Florida 32301 David H. Pingree, Secretary Department of Health and Rehabilitative Services 1321 Winewood Boulevard Tallahassee, Florida 32301 Ronald W. Thomas, Executive Director Department of General Services 115 Larson Building Tallahassee, Florida 32301

Florida Laws (3) 216.311255.249255.25
# 9
ROYAL CONCRETE CONCEPTS, INC. vs BROWARD COUNTY SCHOOL BOARD, 03-002220BID (2003)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Jun. 13, 2003 Number: 03-002220BID Latest Update: Dec. 19, 2003

The Issue Whether the Respondent, School Board of Broward County, Florida (Respondent or Board), may reject all bids as proposed for Bid No. 2002-02-FC, Group A1, or whether such action is illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact The Respondent is the entity charged with the responsibility of governing the public schools within the Broward County School District. As such, the acquisition of school properties and attendant improvements fall within the Board's legal authority. These cases involve the procurement of relocatable buildings suitable for classroom purposes. Pursuant to its authority, on or about December 27, 2002, the Respondent issued a bid that is the subject matter of the instant challenge. The bid, identified in this record as Bid 2002-02-FC, sought proposals for the procurement of district-wide relocatable buildings. In a prior time these buildings were known as "portable classrooms" or "portables." In the post-Hurricane Andrew world, these structures are now pre-engineered and constructed of concrete or steel (or a hybrid of both) and must be, by design, capable of being relocated to various sites. The Petitioners, Royal and Padula jointly, and the Intervenor, James B. Pirtle Construction Company, Inc. (Pirtle or Intervenor), design, construct, and install such structures. In these cases the bid sought several distinct proposals. First, the project sought vendors who would provide and deliver concrete relocatable buildings (Group A1). Group A2 (not at issue in this proceeding) sought steel relocatable buildings. Group B (also not at issue in the instant case) sought site adaptation prices for landscaping, lighted covered walkways, steps, ramps, and other engineering incidental to the installation of the buildings. The advertisement for the bid carried the same generic information as to all groups. The bid documents also contained many terms that were applicable to all groups. Pertinent to the issues of these cases are the following excerpts from the bid document (Joint Exhibit 2). The order of the excerpts should not suggest any significance. The excerpts are listed in this manner solely for convenience sake: BASIS OF AWARD In order to meet the needs of the school system . . . each Award will be . . . up to three responsive and responsible bidders meeting specifications, terms and conditions. Individual projects will be issued . . . based upon lowest cost among one or more bidders per project as determined by the project manager. Therefore, it is necessary to bid on every item in the group, and all items in the group must meet specifications in order to have the bid considered for award. Unit prices must be stated in the space provided on Document 00410 Bid Form. SBBC [the Respondent] reserves the right to procure goods from the second and third lowest bidders if: a) the lowest bidder cannot comply with delivery requirements or specifications; b) the lowest bidder is not in compliance with delivery requirements or specifications on current or previous orders; c) in cases of emergency; d) work may be issued to multiple contractors if in the opinion of The School Board of Broward County, Florida or its staff the work cannot be completed by a single contractor in the specified time such as a Summer, Winter or Spring Break or if it is in the best interest of SBBC to do so regardless of reason. ARTICLE 4 BIDDING PROCEDURES 4.01 FORM AND STYLE OF BIDS A. Bids shall be submitted on forms identical to Document 00410, Bid Form, and other standard forms included with the Bidding Documents. The following documents are required to be submitted with the Bid: * * * SIGNED SEALED ARCHITECTURAL AND ENGINEERING DESIGN DRAWINGS OF THE STRUCTURES TO BE PROVIDED (FOR RELOCATABLE BUILDINGS BID ONLY) 5.03 REJECTION OF BIDS AND IRREGULAR PROPOSALS * * * The Owner shall have the right to reject any or all Bids, reject a Bid not accompanied by a required bid security, good faith deposit, or by other data required by the Bid Documents, or reject a Bid which is in any way incomplete, irregular or otherwise not Responsive. The Owner may waive any formality in the bid requirements and award or not award the contract in the best interests of The School Board of Broward County, Florida. (Emphasis in original not shown) In addition to the foregoing, the bid documents contained detailed and specific design criteria that set forth information such as the slope of roofs, the roof spans, the mechanical systems, ventilation, plumbing, windows, and stoops. These design criteria covered hundreds of topics and encompassed virtually every facet of the structures. To review each bid proposal as to whether each design specification was met would require countless man-hours. The issue of how to review the bid proposals was not adequately anticipated by the Respondent. From the outset the bid document evolved from unusual circumstances. Whether the bid document was intended to be a request for proposals (RFP) or an invitation to bid (ITB) was a primary confusion among the Board's staff. If the proposals were to be deemed responsive or not and then ranked solely on price (thus making the bid process more like an ITB) how could staff effectively determine the threshold question of responsiveness? If the proposals were to be ranked based upon a point or qualitative approach (more like an RFP) where were the criteria by which to score the proposals? In fact, there were no objective criteria disclosed in the bid document by which a proposal could be evaluated. More curious is that no bidder brought this lack of evaluation criteria to the Board's attention during the mandatory bidder's conference. Moreover, no one challenged the bid specifications. Presumably, the bidders believed it was an "all or nothing" award. That is, if they were the lowest responsive bidder, they would receive the award. The question of who would be responsive and how that decision would be resolved did not come to light until after the bids had been opened. At the mandatory bidders' conference conducted on January 14, 2003, the bidders posed questions in the form of requests for information. In response, the Respondent issued six addenda intended to cover the questions posed. None of the responses addressed how the bid proposals would be evaluated. If anything, Addendum No. 3 added to confusion related to what documents must be submitted with the bid proposal. More specifically, Addendum No. 3 provided, in pertinent part: [Addendum 3, question and response to inquiry] 9. Can schematics be submitted with the bid instead of the signed and sealed architectural and engineering design drawings of the structures that are requested in Document Article 4.01.A.6? Response: Signed and Sealed Architectural/Structural Drawings are required to be submitted with the Bid. The Requirement for Mechanical and Electrical signed and sealed drawing is waived, however all engineering associated with the Relocatable Buildings will require engineer of record signed and sealed drawings and calculations prior to issuance of building permit DRC review. Nevertheless, when the bid proposals were opened on March 4, 2003, the Petitioners and the Intervenor were found to be the three lowest bidders. If responsive, the Intervenor would be considered the lowest bidder with the Petitioners being considered alternate vendors for the procurement. Unsatisfied with the preliminary determination that the Intervenor was the lowest bidder, the Petitioners timely challenged the bid award. The Petitioners maintained that the Intervenor had not timely provided sealed design drawings as required by the bid document. Petitioners argued that the Intervenor had attempted to impermissibly amend their proposal by late-filing a set of structural drawings for the bid. Thus the initial bid protest sought to determine what design drawings were required by the bid and whether the Intervenor had timely supplied such drawings. The Petitioners contended that the Intervenor's submittal should be rejected as non-responsive to the bid. Whether they had complied with the full dictates of the bid requirements was potentially at issue as well. While the initial bid protest was referred to the Division of Administrative Hearings and scheduled for formal hearing, the parties continued to attempt to resolve the issues. It was apparent that the bidders had not submitted identical proposals. How the proposed products had been compared and evaluated was difficult to determine. From the Respondent's committee members came the disclosure that the decision of determining whether the bidders had complied with the bid ultimately came from three fashioned questions. If the structure proposed was pre- engineered, relocatable to various sites, and suitable for educational purposes, the entry was deemed responsive. Based upon this assessment the Petitioners and the Intervenor were deemed responsive and their bids ranked based upon price. This approach did nothing to discern if the designs were comparable in quality, if they met the bid design criteria, or if the drawings were even sufficient to comply with the dictates of the bid. The first posting of the bid award for Group A1 was entered March 18, 2003. On March 21, 2003, the Petitioners timely filed their notices of intent to protest the award of Group A1 to the Intervenor. Thereafter they timely filed the petitions to protest the award and the initial protest was forwarded to the Division of Administrative Hearings. The protests did not encompass Group A2 or Group B. No bidder protested the proposed awards for Group A2 or Group B. In fact, the Respondent went forward on those procurements and awarded contracts for those groups on April 1, 2003. The Respondent did not award the contract award for the Group at issue in this proceeding. It must be noted that the instant procurement is not the Board's first experience with the procurement of concrete relocatable classrooms. In fact, the Board has purchased similar structures through a procurement contract that the Palm Beach County School Board holds with its vendors. One of the Respondent's concerns when the instant bids were reviewed was why the cost per unit for the bids in this case was higher than the Palm Beach County amount. As it turned out, the installation economy of multiple units at one site directly impacts the cost of the relocatable structures. Royal confirmed this information after the bids had been opened. When the Respondent's staff met with its counsel in preparation for the initial bid dispute (before the Board elected to reject all bids) the cost of the bid, the lack of full evaluation of the bidders' proposals, and the issues of the first protest were openly discussed. By that time any irregularities with the bid documents could not be repaired as to the contracts already awarded, but as to the instant matter the Respondent could revisit the circumstances and determine its best course. As a result of that reassessment, the Respondent elected to reject all bids regarding this group and attempt to re-bid the procurement with more certain terms. To that end on May 9, 2003, the Respondent issued a revised bid decision that provided in pertinent part: The Facilities and Construction Management Division intends to recommend that The School Board of Broward County, Florida, at the School Board meeting on June 3, 2003, reject all bids received for Group A1 and authorize revising the bidding documents and re-bidding. The rejection of all bids received for Group A1 is made due to serious flaws and ambiguities contained in Document 00200 4.01.A-6 as modified by Addendum No. 3. The Division intends to revise the bidding documents to delete the requirements that bidders submit plans with the bids; include ranges of unit quantities within the bid form; include one or more additional types of construction of the classroom buildings including a composite concrete/steel structure; and incorporate within the new Invitation to Bid all revised terms and conditions that were released through addenda in this procurement. The Petitioners timely filed protests regarding this new decision by the Board and the instant action ensued. By issuing the revised decision to reject all bids the Respondent intended to resolve all issues and to cure the perceived problem with the lack of consistent evaluation of the bidders' proposals. More specifically, the Respondent would be able to assure that the project design could comport with the specifications sought; specify whether architectural or engineering drawings were required and when (it was hoped that the confusion over "architect" vs. "engineer" could be eliminated); and obtain a substantial discount based upon economies from multi-unit purchases for a single site. None of the objectives sought were pre-textual or contrived. Additionally, by avoiding any process that would require a detailed reviewed of the bidders' proposals, countless man- hours could be saved.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Broward County enter a Final Order affirming the decision to reject all bids in this matter. DONE AND ENTERED this 20th day of November 2003 in Tallahassee, Leon County, Florida. S ___________________________________ D. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of November 2003. COPIES FURNISHED: Dr. Franklin L. Till, Jr. Superintendent Broward County School Board 600 Southeast Third Avenue Fort Lauderdale, Florida 33301-3125 Daniel J. Woodring, General Counsel Department of Education 325 West Gaines Street 1244 Turlington Building Tallahassee, Florida 32399-0400 Usher Larry Brown, Esquire Brown, Salzman, Weiss & Garganese, P.A. 225 East Robinson Street, Suite 660 Orlando, Florida 32801 Steven L. Schwarzberg, Esquire Schwarzberg & Associates Esperante, Suite 210 222 Lakeview Avenue West Palm Beach, Florida 33401 Thomas R. Shahady, Esquire Adorno & Yoss, P.A. 350 East Las Olas Boulevard, Suite 1700 Fort Lauderdale, Florida 33301 Robert Paul Vignola, Esquire Broward County School Board C. Wright Administrative Building 600 Southeast Third Avenue, 11th Floor Fort Lauderdale, Florida 33301

Florida Laws (2) 120.569120.57
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer