Findings Of Fact The Department of Environmental Regulation (hereinafter "DER") issued a letter of "intent to issue" a permit based upon an application submitted by Respondent John H. Voorhees for a weedgate and associated fences to be placed at the mouth of the Hollerich Subdivision canal in Big Pine Key, Monroe County, Florida. The majority of owners of lots in the Hollerich Subdivision are in favor of the gate. The Hollerich Subdivision canal is approximately 1,200 feet long. it is an east-west dead-end canal with its mouth facing east. Floating seaweeds, grasses and detritus (a/k/a wrack are blown into the canal by the prevailing east and southeast winds. Although some surface wrack may blow back out of the canal with the occasional west wind, the sunken weeds will not. The accumulation of windblown wrack results in a stench caused by hydrogen sulfide gas from rotting weeds. The odor causes nausea, sore throats, and sneezing. Water quality tests of dissolved oxygen (DO) taken both in April 1985 and in November 1986 show the water in the canal to be below state standards. The low DO levels found in the canal are primarily due to the rotting weeds although the nutrients leaching from the surrounding yards also contribute to those low levels. The area outside the canal is better able to diffuse and absorb the wrack problem than the area inside the carnal. Accumulations of wrack outside the canal are more temporary and therefore produce less navigational difficulty and less deterioration of water quality. The navigational problems caused by weeds choking the canal range from difficulty in steering to poor visibility. The decaying wrack also causes growth on boat bottoms, can damage boat cooling systems, and turns the water in the canal red. The amount of wrack entering the canal and accumulating there has been increasing over the last five years. The proposed structure will stop wrack from entering the canal and will function as a weedgate. The design of the gate will not cause any navigational hazards, although the weedgate should have navigational aids to assure safety. Although the weedgate will not improve water quality in the canal so as to meet state standards, it will result in an improvement. DER has no jurisdiction to resolve property disputes. The proposed weedgate is to be placed in front of the canal with no on-land attachments, and Respondent Voorhees has given reasonable assurances that the proposed gate is not on privately owned property. The proposed structure will be placed in Class III Outstanding Florida Waters. DER has balanced the positive public interest effects that will accrue to the owners of property along the canal against the' negative public interest effects that may accrue to owners of property at the mouth of the canal. Respondent Voorhees has given reasonable assurances that the project will be clearly in the public interest. Respondent Voorhees has given reasonable assurances that the proposed project will meet all applicable DER rules and standards.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that a Final Order be entered (1), granting Respondent Voorhees' permit application and (2), authorizing the issuance of a permit subject to all permit conditions contained in the Department's letter of Intent to Issue the permit and also including the condition that no trespassing occur on the property at the mouth of the canal attendant to either the construction or the maintenance of the weedgate and associated fences. DONE and RECOMMENDED this 17th day of February, 1987, at Tallahassee, Florida. LINDA M. RIGOT, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 86-0599, 86-0600, 86-0601, 86-0954, and 86-0955 l. Respondent Department of Environmental Regulation's proposed findings of fact numbered 1-5, 9, 10, 12-15, 17-20, the first and last sentences of 21, 23, 28, and 29 have been adopted in this Recommended Order either verbatim or in substance. The remainder of the Department's proposed findings have been rejected as follows: 6-8, 11 and 16, as being unnecessary for determination herein; the remainder of 21 and 22 as being immaterial to the issues herein; and 24-27 as being subordinate. 2. Respondent Voorhees' proposed findings of fact numbered l, 3, 8, and 13 have been adopted in this Recommended Order. The remainder of Voorhees' proposed findings of fact have been rejected as follows: 2 and 16 as being subordinate; 9 and 10 as being unnecessary; and 11, 12, 14 and 15 as not being supported by the evidence in this cause. COPIES FURNISHED: Douglas H. MacLaughlin, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 John H. Voorhees Route 1, Box 612 F Big Pine Key, Florida 33043 H. Ray Allen, Esquire 618 Whitehead Street Key West, Florida 33040 Dale Twachtmann Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301
Conclusions On May 11, 2007, the Division of Administrative Hearings (‘DOAH’) submitted a _ Recommended Order (“RO”) to the Department of Environmental Protection (‘DEP’) i in . these consolidated proceedings. Copies of the RO were served upon the Petitioners, Mellita A. Lane, Jacqueline M. Lane, Peter A. Lane, (“Lane Petitioners”); Friends of Perdido Bay,.Inc., and James A. Lane (“FOPB”); and the Co-Respondent, International Paper Company (“IP” ). On May 29, 2007, all Petitioners and Respondent IP filed Exceptions to the RO. Respondent DEP filed Exceptions to the RO and Motion for Remand. ; On June 8, 2007, the FOPB filed a Reply to IP’s Exceptions and a Response to DEP’s Motion for Remand and Exceptions. The Lane Petitioners filed their Response to iP’s and DEP’s Exceptions. Respondent DEP filed Responses to the Exceptions filed . by the FOPB, the Lane Petitioners and IP. Respondent IP filed Responses to the Exceptions of FOPB, the Lane Petitioners and DEP. This matter is now before me for. final agency action. . _ BACKGROUND » Florida Pulp and Paper Company first began operating the Cantonment paper mill in. 1941. St. Regis Paper Company (St. Regis” ) acquired the mill in 1946. In 4984, Champion International Corporation (“Champion”) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such a as printing and writing grades c of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to | be printing and writing paper. ' The mill s wastewater effluent i is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is . sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class I water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama, on the west. The dividing line between ‘the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 98 crosses the Bay, going east and west, and forms the boundary between what is-often referred to as the “Upper Bay” and “Lower Bay.” The Bay is relatively shallow, especially | in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay i is designated asa Class ill water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. Itis primarily a freshwater river but itis sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (“OFW’) in 11979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, isa large tract of land owned by IP called the Rainwater Tract, The northern part of the tract is primarily freshwater wetlands. The southern partis a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. | ' Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (‘DER’) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The United States Environmental Protection Agency ("EPA") issued St. Regis a National Pollutant Discharge Elimination System (“ NPDES") permit i in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its wastewater treatment plant (‘WWTP’) in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production - process. In 1987, Champion applied to DER for an operating permit-for its modified WWITP and also petitioned for a variance from the Class iI water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's . subsequent proposal to issue the operating permit and variance was formally challenged. In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for the operating permit and requested a . temporary operating permit ("TOP"), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 (‘the 1989 Consent Order’). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violations of state water quality standards in Elevenmile Creek for dissolved oxygen (“DO”), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommend measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed bya series of related scientific studies, which are referred to collectively in the RO as “the Livingston studies.” The 1989 Consent Order had no expiration date, but it was tied to the TOP, , which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The mill was not in compliance with all water quality standards in December 1 994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. instead, the Department agreed through correspondence with . Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. - In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1 995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal ‘operating permits into a single permit identified as Wastewater Permit Number FLO002526-002-IWF/MT. During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmiie Creek or the Escambia River. . In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WwTP upgrades consist of converting toa. modified activated sludge treatment process, incteasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (‘MGD’). IP proposes to convey the treated effluent by-pipeline 10.7 miles to the 1,464-acre wetland tract owned by IP (contained within-the larger Rainwater Tract), where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and Upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to: reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department published notice of its intent fo issue a proposed permit, consent order, experimental wetland exemption, and waiver. The — Department authorizations would allow IP to change its industrial wastewater treatment system at the mill, construct an effluent distribution system within the wetland tract, construct the 10.7-mile pipeline to transport its treated wastewater to the wetlands, and discharge the treated wastewater into the wetlands. In April 2005, Mellita A. Lane, Jacqueline M. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane (“Lane Petitioners”) filed identical petitions challenging the Department authorizations on numerous grounds. The Department forwarded the petitions to DOAH for assignment of an Administrative Law Judge (“ALJ”) and to conduct an evidentiary hearing. The Lane Petitioners subsequently amended their petitions. In May 2005, Friends of Perdido Bay, Inc., and James Lane filed a petition for | hearing to challenge the Department authorizations. The FOPB petition was forwarded to DOAH and the pending cases were consolidated for the fi nal hearing. The FOPB petition was subsequently amended. In October 2005, while the cases were pending, IP applied for a revision to its NPDES permit renewal application. The cases were abated so that the DEP could review and act on the permit revision. In January 2006, DEP issued a proposed revised | NPDES permit and a corresponding First Amendment to Consent Order. On July 26, 2006, the Department filed without objection a revision to the Consent Order. On July 31, 2006, the Department filed Joint Trial Exhibit 18 that integrated the Consent Order dated April 12, 2005, the First Amendment to Consent Order dated January 11, 2006, and the Department’s Notice of Minor Revision {o Consent Order filed on July 26, 2006. The DOAH Administrative Law Judge CALL") held a lengthy final hearing in these consolidated cases on May 31, June 1, 2, and.26 through 30, and July 17, 27, and 28, 2006. Prior to the hearing, the parties filed their Joint Pre-Hearing sit on May 24, 2006. The ALJ subsequenty submitted his RO on May 11, 2007. -
The Issue The issues to be resolved in this proceeding concern whether the Respondent Gate Petroleum Company (Gate) has provided reasonable assurances that Water Quality Standards will not be violated by the proposed modification of Gate's dredge and fill permit No. 160462149 and whether Gate has provided reasonable assurances that the proposed modification of that permit will not be contrary to the public interest, nor be the occasion of adverse cumulative impacts to water quality or public interest considerations so as to make this project contrary to the public interest.
Findings Of Fact The Respondent Gate Petroleum Company, by and through its wholly-owned subsidiary, Gate Maritime Properties, Inc., proposes to construct a ship- berthing facility for two ships adjacent to Blount Island Channel, along the southeastern portion of Blount Island, in the St. Johns River, in Duval County, Florida. The proposed facility would provide for the berthing of two ships of the United States Navy Military Sea-Lift Command in conjunction with the mission of the Navy's Rapid Deployment Force. The proposed facility would be located along the southeasterly portion of "Cut A" of the Blount Island Channel and will consist of a "T-head Pier", a breasting dolphin and cat walk and two mooring dolphins. The pier would be connected to the land by an approach trestle. The facility involved will be constructed by the insertion of concrete pilings into the bottom of the Blount Island Channel and in the adjacent upland, which would support concrete decks and caps. Removal of dredged material will be necessary to accomplish the project and will be performed by a floating hydraulic dredge with associated "Cutter Head." The resulting dredged material would be disposed of in a diked spoil area on either Blount Island or at the Dayson Spoil Site adjacent to the mouth of Clapboard Creek. The Respondent Gate currently holds a DER dredge and fill permit, No. 160462149, authorizing the removal of approximately 3.4 million cubic yards of dredged spoil and the installation of an associated 5,000 feet of shoreline bulkhead. The proposed installation of the pier and mooring facilities would result in a modification of that permit so that approximately 1,000 feet of shoreline bulkhead and most of the related dredging will be unnecessary and not performed. Instead, approximately 7,100 cubic yards of dredging would be necessary, without the necessity for bulkheading. The remaining shoreline bulkhead and dredging authorized under the above permit would be rendered unnecessary and replaced by the addition of two additional T-head piers and associated dredging at some indefinite time in the future. The additional piers and dredging are not involved in this permit modification application and are not before the Hearing Officer at this time. The Blount Island Channel of the St. Johns River, the St. Johns River and Clapboard Creek are classified as Class III surface waters of the state pursuant to Sections 17-3.081 and 17-3.121, Florida Administrative Code. It has been established by stipulation of the parties that the proposed modification of the dredge and fill permit will not adversely affect navigation nor the flow of water in the Class III state waters involved. It is also stipulated that the proposed modification will not adversely affect historical and archaeological resources pursuant to Section 267.061, Florida Statutes. It is stipulated as well that the discharge of effluent from the Dayson spoil site will not violate water quality standards at the point of discharge in the Fulton-Dames Point Cut. On March 22, 1989, the Florida Department of Environmental Regulation issued its intent to approve the proposed permit modification so as to allow the elimination of the previous requirement in the permit to monitor for copper at the site of the effluent discharge; the relocation of the Blount Island spoil site effluent discharge and the construction of a T-head pier on the southeast side of Blount Island adjacent to the Blount Island Channel. The Department did not initially grant the request to relocate the Dayson spoil site effluent discharge from the Corps of Engineer Channel (Dames Point Cut) to the mouth of Clapboard Creek. On January 31, 1986, Gate was issued permit No. 160462149, pursuant to Chapters 403 and 253, Florida Statutes, with an expiration date of January 31, 1991. It authorizes the dredging and filling on and adjacent to Blount Island referenced above. The permit authorizes those operations in two phases, consisting of new dredging of approximately 300,000 cubic yards in the existing slipway and test area to obtain a project depth of 40.2 feet mean low water. Maintenance dredging was authorized in the amount of approximately 1,850,000 cubic yards in the slipway to maintain the above-noted project depth. New dredging of no more than 3 million cubic yards from the northeastern and southern margins of Blount Island to a depth of 38 feet mean low water (MLW) and 20 feet MLW on the northeastern and southern portions of Blount Island respectively, with attendant maintenance dredging, was authorized. The permit also allowed he construction of shoreline bulkheads along the eastern and southern margins of Blount Island. That 1986 permit also required disposal of dredged material from both phases of the project into diked areas on Blount Island and the existing diked off-site disposal area known as the Dayson Site, near the mouth of Clapboard Creek. Effluent from both sites was to be discharged to the Fulton-Dames Point Cut. Effluent from the Dayson site was to be discharged to the Fulton-Dames Point Cut or routed by pipeline to the Blount Island disposal site for additional treatment prior to discharge. All dredging under the 1986 permit was to be done via a suction, cutter-head dredge apparatus, with the speed of the cutter-head to be controlled so as to prevent excessive turbidity; and with all dredged material to be placed in diked areas, with the effluent discharge being conducted over adjustable weirs. The dredging of the approximately 7,100 cubic yards of material associated with the modification application at issue will be performed with the same type of equipment. Both spoil disposal sites have sufficient capacity for disposal of the material involved with the construction of the T-head pier. The effluent or "de-watering water" generated from the disposal of the dredged material at the Dayson on site will be discharged through a pipe under the St. Johns River to a point near the confluence of the Dames Point Cut and the Old River Channel. That material will consist of approximately 10 percent dredged solid material and 90 percent water. The Dayson disposal site is surrounded by dikes 24 feet high and 120 feet wide at their base. They are so constructed that there will be no discharge of effluent from the Dayson disposal site to Clapboard Creek. Since 1974, over four and one-half million cubic yards of material have been disposed of at the Days on site without any violation of state water quality standards in the creek or the adjacent salt marsh. The entire 7,100 cubic yards of dredged material, together with related water could be placed in the Dayson disposal site without causing any discharge. Gate Maritime Properties, Inc. has a five-year lease agreement with Leadermar, Inc. which will operate the T-head pier as a berthing facility for the two ships. The lease was scheduled to commence July 22, 1989. Under the terms of the contract awarded by the Navy to Leadermar, Inc., Gate, or its lessee, is required to maintain a 110 foot, safe working area surrounding the vessels for operation of tugs, lighterage vessels and fendering operations. The contract with the Navy does not require, however, that the safe working area be maintained at a depth of minus 32 feet "mean lower low water" as shown by Gate Exhibit 6 in evidence. 1/ Given the findings made infra., concerning the lack of adverse water quality or public interest impacts caused by the dredging, and the paucity of any attendant suspension of bottom materials in the operation of the ships to be berthed at the proposed facility, the issue of whether the contract with the Navy requires a depth of minus 32 feet "mean low water" or "mean low low water", a reputed difference of 1.03 inches according to the rebuttal exhibit of Respondent Gate, neither Gate's position nor the Navy's reputed position regarding this apparent contractual dispute item, if carried out, would have any adverse water quality or public interest impact in the context referenced in these findings of fact and conclusions of law. The fact remains that Gate has applied for authority to recede from the massive dredging project presently authorized in the existing permit, to stipulate by this modification application that it only seeks to dredge 7,100 cubic yards of material in the area involved. Based upon the depth established by the marine survey conducted by Bennett, Wattels and Associates, there will be an adequate safe working area for tug boats, fuel barges and lighterage vessels, as well as the ships themselves, for operations involving the berthing facilities. See Gate Exhibit 5 in evidence. If the requested modification is granted, Gate will not dredge more than 7,100 cubic yards of material for construction of the pier and related facilities and in order to provide a safe working area as required under Leadermars contract with the Navy. Indeed the amount of material to be dredged for the construction and operation of the T-head pier was based upon the above- referenced Marine survey, unrefuted evidence in this record. The volume of material was calculated by using the Marine Survey depths and the "average end area method," a widely accepted method of such calculation in the marine engineering and construction field. Further, Gate adduced the only substantial evidence in this record concerning the issue of the amount of dredging involved or the extent of the dredged area, as that relates to the "safe working area" and other issues. Water Quality Gates' consulting experts performed various chemical and sediment analyses in the project area in order to establish a general composition of bottom sediments and to establish the likelihood of suspension of any toxic substances or pollutants in those sediments as a result of the dredging operation or the operation of the ships and berthing facilities. Those analyses, and their results, in evidence in this record, were unrefuted. The bottom sediments in the vicinity of the project area are predominantly fine sand with small fractions of silt. In general, the dredged material is most likely to be free from chemical or biological pollutants where it is composed of sand, gravel or other naturally occurring inert materials, as opposed to large percentages of organic materials, which were not shown to exist in the vicinity of the project site. Based upon the characteristics of the bottom sediments in the project area, there will be no re-entrainment of toxins or pollutants which night presently be sequestered in the sediments due to construction, dredging operations or the operations of the berthing facility and ships involved. An elutriate test was performed to predict the effect on water quality from temporary suspension of the bottom sediments during the dredging operation itself. Elutriate testing is a widely recognized, conservative estimate of contaminant releases, caused by dredging, into a water column. The parameters tested for are those specified in the Department's rules for Class III waters and include cyanide, mercury, silver cadmium, selenium, barium, beryllium, nitrogen, (unionized NH3, NO2, total TKN), fluoride, copper, iron, nickel, zinc, aluminum, pesticides, herbicides and PCBs (polychlorinated biphenyls). The elutriate test results did not reveal any excess ion of any of these parameters in terms of the state water quality standards or as to prevailing natural background levels. There are no PCBs, hydrocarbons, heavy metals or pesticides shown to be sequestered in the bottom sediments of the Blount Island Channel in the vicinity of the proposed project. The chemical analyses was performed on composite elutriate samples of sediments which came from the area of the T- head pier location and the area north of the pier, where the propellers of the ships will be located and operated during test trials, after the ships are berthed at the site. Site specific chemical analyses and core borings were taken and compared with historical data or studies for these sites and found to be consistent with them. There is no likelihood of sequestered contaminants in the bottom sediments which would be released, with deleterious effect on water quality, as a result of the action of the dredge equipment or the operation of the ships after the facility is installed. Cutter-head, hydraulic pipeline dredges are not significant generators of turbidity. They are an efficient means of performing dredging and are designed to loosen and remove material from the bottom substrate, without disturbing or redistributing the dredged material around the dredge apparatus in the water column. The use of the hydraulic pipeline dredge will result in minimal water quality disturbance and any dredge-induced turbidity will be of a transitory, short-term nature. It would be localized in the immediate vicinity of the dredge's cutterhead in any event. Ambient water quality conditions can be expected to return to normal background levels in a matter of hours following cessation of the dredging activity. It is estimated by Gate's consultant witnesses that the dredging activity might be accomplished in approximately one day. It has thus been established that the relevant stage water quality standards will not be violated by the action of the dredging equipment and the dredging operation itself. Water Quality Impacts of Facility Operation The two ships of the military sealift command which are to be berthed at the proposed T-head pier are 948 feet in length and approximately 105 feet in beam. They are equipped with two main engines and two propellers. The propellers are 22 feet, 11 and 9/16 inches in diameter. The ships will be in what is known as "reserved operating status". The ships will go through a dry- docking procedure at a local shipyard approximately every two years for major overhauls, repairs and painting. Such maintenance work will not be performed at the project site. The ships will, however, undergo periodic "dock trials" while berthed at the facility. The dock trials will be conducted on a quarterly basis if the vessels have not been out on a mission in that quarter of the year. The dock trial procedure calls for the main propulsion powerplants of the ships to be put into operation and evaluated. Both main engines are tested under this procedure for approximately one hour, at ten revolutions per minute (rpm) ahead and astern. The tests are to be conducted by civilian personnel retained by the Navy or its contractor, with all appropriate safety precaution being taken. These include, but are not limited to, the manning of the bridge during tests by a master or chief mate and by rotating one engine ahead simultaneously with the other engine being rotated astern. The ships are also equipped with onboard, internal sewage treatment plants so as to prevent the discharge of pollutants to state waters. Only routine maintenance or repair work will be performed on the ships at the lay birth facility. The ships will be refueled at the facility from time to time with "bunker c" or diesel fuel brought in by barges. The barges will be conveyed by tugboats of no more than 16 feet draft. The fueling operation will be governed by the U.S. Coast Guard regulations and are performed by Coast Guard certified and licensed personnel. Dr. Neal Boehnke was accepted as an expert in the field of chemical analysis of water and testified on behalf of the Petitioner. In his opinion, water quality in the facility of the proposed project is poor and may contain elevated hydrocarbon levels. His opinions, however, are based upon 1982 and 1983 reports of sampling results allegedly obtained by the City of Jacksonville Bioenvironmental Services Division and the DER, as well as the study entitled "Survey of Hydrocarbons and the Lower St. Johns River in Jacksonville." These documents were not introduced into evidence. While it is true that an expert may base his opinion on facts and data made known to him in the normal course of his practice at or before trial and that those facts or data may be relied upon by him in formulating his opinions, it must be demonstrated that those facts and data are "of a type reasonably relied upon by experts in the subject to support the opinions expressed." See Section 90.704, Florida Statutes. In this proceeding, it was not established by competent evidence or testimony at hearing that the facts or data derived from these documents were of such a type as to be encompassed by this statutory section and thus they cannot serve as a legitimate basis for Dr. Boehnke's opinion. They otherwise constitute inadmissible hearsay, not sufficient to support a finding of fact on the water quality impacts from the proposed project and they do not constitute corroborative or explanatory hearsay related to any accepted, competent, substantial evidence in this record for purposes of the hearsay admissibility provision in Section 120.58, Florida Statutes. Therefore, Dr. Loehnke's opinion concerning alleged elevated levels of hydrocarbons in the water at the project site is not credited and is rejected. Dr. Allan Niedororda was accepted as an expert in the fields of oceanography, hydrology and hydrologic assessment. He conducted a study on the potential impact to water quality in the Blount Island Channel which might result from the dock trials to be carried out as a part of the routine maintenance and testing of the ships. His study evaluated the degree to which the propeller wash from the dock trials might entrain and transport bottom sediments, any related pollutants and the effect of this entrainment on water quality in the surrounding water column. His study consisted of field sampling and measurements of currents in the area, laboratory analysis and related data analysis. Bottom sediment samples from the project area were analyzed for particle size and grain size distribution according to standard, scientifically accepted procedures. The bottom sediments in the area of the project site are characterized by a sandy sediment of a fine to medium particle size characteristic. The bottom sediments largely consist of clean sand and small gravels, with some silt composition. The propeller wash which will be generated by the testing of the ships engines was computed to have a speed of approximately one half foot per second. Maximum speed will occur about three propeller diameters behind the plane of the propeller itself or about 72 feet behind the propellers. The bottom tip of the propeller with which the ships are equipped will be six feet off the bottom of the channel at low tide. At the point the propeller wash contacts the bottom, its speed will be approximately two tenths of a foot per second. Such a velocity will not be of sufficient force to produce such sheer stress on the bottom sediments as to entrain them or, that is, to displace them upward into the water column. Dr. Niedororda established that, even if the propeller wash is added to the natural velocity of the water currents at the project site, there would be no entrainment of the bottom sediments which he sampled in the project area. It has also been established that the routine, minor maintenance of the ships and dockage facilities involved in the permit application and the fueling and other operations associated with the berthing, testing, entry and egress of the ships from the proposed berthing facility will occasion no water quality violations, so long as appropriate Coast Guard regulations attendant to fueling and the prevention of the deposition of refuse and other wastes into the waters involved are observed. Any grant of the proposed permit modifications should be conditioned upon the strict observance of those regulations and procedures, especially with regard to the potential for spillage during fueling operations. Public Interest Standards Section 403.918(2), Florida Statutes provides that a permit may not be issued unless the applicant provides the department with reasonable assurances that the project is not contrary to the public interest. In determining whether this is the case, the Department must consider and balance the following criteria: Whether the project will adversely affect the public health safety or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061; The current condition and relative value of functions being performed by areas affected by the proposed activity. It has been established by stipulation that the project will not adversely affect navigation or the flow of water and that the project will not adversely affect significant historical or archaeological resources. Unrefuted evidence adduced by Gate and the Department have established that the project will not adversely affect the public, health, safety, welfare or the property of others, if the project is constructed, installed and operated as proposed in the modification application and as proved in this case. The conservation of fish and wildlife, including endangered or threatened species, or their habitats, as well as fishing and recreational values and marine productivity in the project area will not be adversely affected. No harmful erosion or shoaling will be caused by the installation or operation of the project facility. In this connection, Dr. A. Quinton White, a member of the Board of Directors of the Petitioner, C.E.S., acknowledged in his testimony that the Manatee Protection Plan and Manatee Watch Program proposed to be inaugurated by Gate will adequately protect any Manatees frequenting the area. Manatees are an endangered species, but it has been established that the permit modification proposed, if installed and operated, will not adversely affect the conservation of Manatees or their habitat. The Petitioner adduced no evidence on this issue or any of the public interest criteria enumerated above. The area at the project site is characterized by fairly firm consolidated bottom substrata, characterized by very few submerged grasses. Due to the sandy, hard bottom in the project vicinity, there is a paucity of marine grass upon which Manatee could feed. Consequently, Manatees do not and are not likely to frequent the area involved at the project site as that might reflect on the likelihood of their injury or destruction due to operation of the ships and any attendant vessels. Dr. Niedoroda established that the project and the attendant operations of the ships will not cause harmful erosion or shoaling and witness Gary Tourtellotte, testifying for Gate, established that the effects of the construction and operation of the T-head pier on the benthic community and marine productivity in the vicinity of the project will not induce any adverse effect on those elements of the public interest standards involved. The Petitioner offered no credible or credited evidence of equivalent value which could contradict the evidence adduced by Gate on this aspect of the public interest standards. It is true that dredging of the bottom substrata will temporarily eliminate the benthic community within the dredged area itself. It was established by expert testimony, however, that the benthic community will rapidly re-colonize itself with similar organisms to a naturally occurring degree within approximately 6-12 months. The benthic community in the project vicinity is of a low density nature, with a low diversity of organisms. Those organisms occurring in the project site area are estuarine, marine benthic species commonly associated with sandy or silty bottom substrates. Because the area to be dredged is quite small or approximately .25 acres, and the dredging operations will be of short duration, approximately one day, the dredging operations will not have a significant adverse effect on the benthic communities occurring in the project area or in the adjacent St. Johns River. The dredging associated with the project will likewise not have a significant long-term adverse impact on fisheries resources or marine productivity of the Blount Island Channel or the St. Johns River. This is because the area to be dredged is minimal in size and does not contain critical marine benthic habitat. The turbidity generated will be minimal because the sediments are predominantly coarse sands and gravels. Because of this, any turbidity occasioned by the installation and operation of the proposed facility will be very brief and not of a sufficient significance as to violate water quality standards. In view of the hydrologic analysis in evidence concerning propeller wash effects, the bottom sediments at the ship mooring area will not be entrained or suspended in the water column to any significant degree due to propeller operation of the ships. Thus the benthic community in the mooring area for the ships will not be disturbed due to currents created by the operation of the propellers. In a similar vein, it has been shown that the dredging and operation of the T-head pier and mooring facilities, including the attendant conduct of periodic dock trials and the entry and egress of the ships will not violate the water quality criteria for biological integrity. Indeed, the periodic dock trials are shown to have no impact on the benthic community, the fisheries or marine habitat involved at the project site. It was neither shown that the dredging associated with the construction of the pier and berthing facilities will have any adverse impact on fin fish or shellfish in the project area. It has been established that the project will be of a permanent nature, but it has not been established that the current condition and relative value of the functions being performed by the areas affected by the proposed activity in terms of their functions as productive marine habitat, as furnishing fishing or recreational values and the like, will be adversely affected by the proposed project and attendant activity. Deletion of Copper Monitoring Requirement The 1986 permit authorizing the removal of approximately 3.4 million yards of dredged material with attendant extensive bulkheading in the Blount Island Channel requires also that Gate Monitor for copper every two weeks during discharges at the downstream boundary of the mixing zone for each point of a effluent discharge. Effluent from both the Blount Island and Dayson Disposal Sites is discharged into the Fulton Dames Point Cut. The Petitioner has stipulated that the discharge of effluent from the Dayson Spoils Site will not violate any water quality standard at that discharge point. Elutriate testing and other analyses submitted in support of the permit modification request to delete the copper monitoring requirement in the present permit have shown that there will be no violation of water quality standards as to copper, or any of the other water quality parameters involved due to any re-suspenions of bottom sediment during dredging. There will be no violation of water quality standards for copper, caused by the deposition of spoil, consisting of those bottom sediments, and the draining of effluent from the spoils site into the Dames Point Cut. The Department has independently verified the data submitted by Gate as a result of this testing and it has been established that there is no occurrence of any man induced pollutants in the sediments at the project site which will be deposited in the spoil site, (from which the effluent will be disposed of in the Dames Point Cut) which represents any elevation over natural background levels. The sediments to be dredged from the berthing area are not distinguishable from naturally occurring sediments and the copper values in the sediments to be dredged are no higher than those naturally occurring throughout the area. Thus there will be no adverse impact on the water quality occasioned by discharge of the effluent from the spoil site to the Dames Point Cut area due to copper occurring in the sediments or as to any of the other pollutants enumerated above. Thus, there has been no demonstrated necessity to continue monitoring the effluent from the spoil site for copper. In this regard, the Petitioner presented no evidence at hearing concerning the issue of whether copper monitoring should be continued or not. Cumulative Impact Blount Island was created in the 1950's and 1960's by the filling of its area with spoil material during the U.S. Army Corps. of Engineers' construction of the Fulton-Dames Point Cut-Off Channel. Since that time, port facilities and an industrial complex have been constructed on Blount Island. It is one of the principle port facilities for the City of Jacksonville. Under the 1982 DER dredge and fill permit issued to Off-Shore Power Systems, and later transferred to Gate in 1986, the developed area of the island adjacent to the original St. Johns River Channel (the Blount Island Channel) was required to be bulk-headed and the channel dredged to -38 feet MLW. The amount of material to be dredged in the old channel of the St. Johns River for construction of the vertical shoreline bulk head totalled approximately 3.4 cubic yards. The T-head pier involved in this modification proceeding, if constructed, would replace 1,000 linear feet of that shoreline bulkhead authorized by the present permit and would substantially reduce the amount or quantity of material to be dredged. Construction of the T-head pier, instead of the permitted shoreline bulkhead, will minimize dredging and the environmental impact of the facility. Gate has elected to rescind its plans to construct the shoreline bulkhead along the eastern shore of Blount Island, as authorized under the existing dredge and fill permit. Gate instead intends to seek future modification of its existing dredge and fill permit to substitute at least 2 additional T-head piers for all of the shoreline bulk head authorized for the eastern shore of Blount Island. The construction of the additional T-head piers will require substantially less dredging than is authorized under the existing permit. Instead of the 3.4 million cubic yards of dredged material authorized under the existing permit, associated with installation of the shoreline bulkhead, the amount of material to be dredged, if indeed 2 additional T-head piers were applied-for and constructed, would amount to only 269,000 estimated cubic yards, as opposed to the originally authorized 3.4 million. Kevin Pope, the DER witness, established that there are no other projects in the area, or reasonably expected to be located in the project area, which would create impacts in addition to or cumulative with the proposed permit modification project so as to create adverse water quality impacts or which would make this project, because of cumulative impact, contrary to the public interest. There are no other dredge and fill projects in the area of the proposed T-head pier which would adversely impact the waters of the Blount Island Channel and the St. Johns River. The proposed modifications are shown not to likely cause any adverse environmental results and, in fact, will result in an environmental benefit as represented by the agreed-upon recession from the extensive dredging and bulkheading authorized by the present permit. No evidence was adduced by the Petitioner to contravene that adduced by Gate and the Department, which establishes the lack of any adverse cumulative impacts to be occasioned by the proposed project, both as to water quality standards and the public interest standards involved in this proceeding.
Recommendation Having considered the foregoing findings of fact, conclusions of law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is therefore, RECOMMENDED: That a Final Order be entered by the Department of Environmental Regulation approving the proposed modification to permit number 160462149 with the proviso that the conditions contained in the above findings of fact and conclusions of law be incorporated as specific conditions in the modified permit, including the additional condition agreed to at Final Hearing that the Manatee Protection Plan and Manatee Watch Program will be inaugurated and be incorporated as a specific condition in the modified permit. DONE and ENTERED this 11th of October, 1989, at Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of October, 1989.
The Issue The issue is whether Bayou Arbors, Inc. (Arbors), is entitled to a dredge and fill permit to construct docks in DeBary Bayou, Volusia County, Florida.
Findings Of Fact On January 8, 1986, DER received an application from Arboretum, a predecessor in interest of Arbors, to construct 12,758 square feet of docks in DeBary Bayou to provide ninety eight (98) boat slips, and to dredge 2,509 cubic yards of shoreline material from DeBary Bayou in areas within DER's jurisdiction under the proposed boat docks, and to place approximately 800 linear feet of concrete riprap along the shoreline after it was dredged. Following the initial application review process, which included on- site evaluations by several DER biologists, on April 14, 1986, DER prepared a Biological and Water Quality Assessment in which DER's staff recommended that the project be modified to delete the dredging, allowing the littoral zone to remain intact. On April 24, 1986, DER forwarded its Biological and Water Quality Assessment to Mr. Charles Gray, the property owner. In response to DER's recommendations, the Applicant submitted, and on April 30, 1986, DER received, a revised Application which deleted the originally-proposed shoreline dredging of 2,509 cubic yards of material as well as the placing of 800 linear feet of concrete riprap. This Application was submitted by Mr. Duy Dao, a Professional Engineer registered in the State of Florida. This Application proposed constructing approximately 17,000 square feet of docking facilities, providing ninety-eight boat slips, along approximately 2,580 linear feet of shoreline adjacent to twenty-four acres of uplands owned by the Applicant. The original and the revised drawings omitted a vertical scale from the cross-section drawings of the project. This omission gave the impression that the shoreline bank of DeBary Bayou was steeper than it actually is and that the water depths in DeBary Bayou adjacent to the north shoreline are deeper than they actually are. However, DER's biologists were on-site four times between February 25, 1986, and May 19, 1986. They observed the existing slope of the DeBary Bayou shoreline and the existing depths in DeBary Bayou, and the on-site observations negated the effect of the omission in the drawings. The omission in the drawings did not affect DER's evaluation of the project. On May 23, 1986, DER issued its Intent to Issue and Draft Permit No. 64-114399-4 to Arboretum. The Intent to Issue and the Draft Permit include the following Specific Conditions: Further construction on the Applicant's property along the DeBary Bayou shall be limited to uplands; Issuance of this permit does not infer the issuance of a permit for dredging in the Bayou at a future date, should an application for dredging be submitted; A deed restriction shall be placed on the condominium limiting boats moored at the facility to seventeen feet or less. A copy of the deed restriction shall be submitted to the Department within sixty days of issuance of this permit; There shall be no "wet" (on-board) repair of boats or motors at this facility; All boats moored at the dock shall be for the use of residents of the condominium only. Public use of the dock or rental or sale of mooring slips to non-residents of the condominium is prohibited; Manatee warning signs shall be placed at 100 foot intervals along the length of the dock(s); Turbidity shall be controlled during construction (by the use of siltation barriers) to prevent violations of Rule 17-3.061(2)(r), Florida Administrative Code. On June 29, 1987, Volusia County, DER and Arboretum entered into a "Joint Stipulation for Settlement" wherein Arboretum agreed not to construct more than twenty-six docks accommodating more than fifty-two boat slips along Arboretum's DeBary Bayou frontage of 2,580 feet. Furthermore, Arboretum agreed that it would modify the configuration and the design of the boat slips and the location of the boat docks; that it would post Slow Speed, No Wake zone signs and manatee education signs along DeBary Bayou from the 1-4 bridge west to a point 100 feet west of the western boundary of Arboretum's boat docks; and that as mitigation for the removal of vegetation from the littoral zone where the boat slips would be constructed, Arboretum would plant wetland hardwood trees. In addition to the Joint Stipulation for Settlement, on June 14, 1987, the property owners, Charles Gray and Sandra Gray, as part of their agreement with Volusia County, executed a "Declaration of Covenants, Conditions, and Restrictions" to which the Joint Stipulation for Settlement was attached as an exhibit. Said Declaration of Covenants, Conditions, and Restrictions, reiterated the Joint Stipulation's limitation of construction of boat docks in DeBary Bayou and further provided that said boat docks would not be constructed at the Arboretum project site in DeBary Bayou unless and until certain maintenance dredging set forth in Article II of the Declaration of Covenants, Conditions, and Restrictions occurred. Furthermore, Article III of said Declaration of Covenants, Conditions and Restrictions set forth certain prohibitions regarding constructing boat ramps on the Arboretum property and docking or storing boats along the DeBary Bayou shoreline except at the site of the proposed docks. In 1969, an artificial channel was excavated in DeBary Bayou adjacent to the north shoreline of DeBary Bayou by a dragline operating along the shoreline. At present, said channel has been partially filled by organic sediments originating in DeBary Bayou. There exists in Section 403.813(2)(f), Florida Statutes, an exemption from the DER's permitting requirements for the performance of maintenance dredging of existing man-made channels where the maintenance dredging complies with the statutory provisions and with the regulatory provisions found in Florida Administrative Code Rule 17-4.040(9)(d). The dragline excavation work performed in DeBary Bayou in 1969 created a structure which conforms to the definition of "channel" provided in Section 403.803(3), Florida Statutes. The maintenance dredging required by the Declaration of Covenants, Conditions, and Restrictions is to be performed by suction vacuuming of the silt sediment, from the 1969 channel and that dredged material is to be placed on Arbors' upland property at the project site. This maintenance dredging differs from the dredging originally proposed by the applicant in its application submitted in January 1986. The dredging originally proposed, which DER recommended against, was to be performed by back hoes and drag-lines which would have cut into the north shoreline of DeBary Bayou and would have affected the littoral zone along the project shoreline. The average water level in Lake Monroe and DeBary Bayou is approximately 1.8 feet above mean sea level. On April 18, 1987, transact studies in DeBary Bayou showed water levels at 3.2 feet above mean sea level and that water depths in DeBary Bayou to a hard sand/fragmented shell bottom ranged from approximately one foot along the south shoreline to approximately nine feet in deep areas in the former channel. The average depth of the channel is five feet below mean sea level. The water depth in DeBary Bayou ranges from approximately one to three feet. At times of average water levels, one to three feet of silt or unconsolidated sediment overburden covers the natural hard sand/shell bottom of DeBary Bayou. This silt and sediment overburden is composed of organic material and is easily disturbed. When it is disturbed, it raises levels of turbidity, although there was no evidence presented that the turbidity would violate state water quality standards. This silt and sediment overburden has been deposited at a faster rate than it would normally be deposited under natural conditions because of the Army Corps of Engineers' herbicidal spraying of floating plants in DeBary Bayou. As this silt and sediment overburden decomposes, it takes oxygen from the water. The presence of a strong odor of hydrogen sulfide indicates that the oxygen demand created by the sediment is greater than the available supply of oxygen at the sediment-water interface. This unconsolidated silt and sediment overburden does not appear to harbor either submerged vegetation or significant macroinvertebrate populations. The Shannon/Weaver diversity index of benthic macroinvertebrates at four locations in DeBary Bayou indicated lowest diversity at the project site and highest diversity at the 1-4 overpass, where a small patch of eel grass is growing. Removal of this silt and sediment overburden from the 1969 channel will enhance the system, enabling a hard bottom to be established, with a probability of subsequent establishment of a diversity of submerged macrophytes. Removal of the silt and sediment overburden from the 1969 channel will restore the natural hard sand/fragmented shell bottom in that area of DeBary Bayou. It is unlikely that boat traffic in the restored channel will cause turbidity which will violate state water quality standards. Removal of this silt and sediment overburden will improve water quality in DeBary Bayou by removing a source of oxygen demand. Removal of this silt and sediment overburden will create a better fish habitat by exposing some of the natural bottom of DeBary Bayou. Fish are unable to spawn in the unstable silt and sediment. Removal of this silt and sediment overburden will increase the depth of water in DeBary Bayou channel to between four to six feet. The maintenance dredging, required by the Declaration of Covenants, Conditions, and Restrictions, is limited by statute to the channel which was excavated in 1969. Therefore, a continuous channel will not be maintained from the project site eastward to Lake Monroe. At present, a sandbar exists at the confluence of DeBary Bayou and Lake Monroe. During low water, this sandbar restricts navigation into and out of DeBary Bayou to small craft. At present, boats can and do travel on DeBary Bayou for fishing and for other water-related recreational activities. However, due to water level fluctuations, boating on DeBary Bayou is easier during higher water periods. During lower water periods, navigation into and out of DeBary Bayou is still possible, but boaters must proceed using common sense and caution. The United States Fish and Wildlife Service (FWS) has no evidence that manatees presently use or have ever used DeBary Bayou. Adult manatees have an average girth of approximately three (3) feet. Without a continuous channel open to Lake Monroe, manatees are not likely to go up DeBary Bayou. Since the water at the sandbar at the mouth of DeBary Bayou at its confluence with Lake Monroe is generally less than three feet deep throughout the year, it is likely that these shallow waters will deter manatees from entering DeBary Bayou. DeBary Bayou is a spring-fed run from a spring a substantial distance upstream. The sheetflow of the spring water follows a circuitous route through marsh areas prior to reaching the area of this project. The proposed site is just west of the 1-4 overpass and Lake Monroe. The FWS's data show that the St. Johns River in Volusia County has an extremely low documented manatee mortality rate resulting from boat/barge collisions. Generally, boats greater than 23 feet long are more likely to kill manatees outright than smaller boats are. In marinas, manatees are very rarely killed by collisions with boats. Manatees and marinas are highly compatible. On August 1, 1986, the FWS issued a "no-jeopardy" opinion regarding Arbors' project. In this letter, the FWS stated that Arbors' project was not likely to jeopardize the continued existence of the manatee or to adversely modify the manatee's critical habitat. In the year since the FWS issued its no-jeopardy opinion, no manatee mortalities resulting from boat-barge collisions have been documented in the St. Johns River in Volusia County. The FWS recommended one boat slip per one hundred linear feet of waterfront, or twenty-six boat slips for the project. A single-family residence which would be entitled to one pier could berth an unlimited number of boats at that single pier. The FWS would have no control over the number of boats using that single pier. Arbors' project calls for twenty-six piers. The FWS's evaluation of Arbors' project is exactly the same as that agency's evaluation of any other marina project anywhere in areas designated as critical manatee habitat. All of the St. Johns River in Volusia County, Florida, is designated as critical manatee habitat. On July 16, 1986, after issuance of its Intent to Issue, DER received comments from the Florida Department of Natural Resources regarding Arbors' project and its potential impact on manatees. DER considered the possibility of boat/manatee collisions and had specifically considered this issue. DER did not agree with the broad and general concerns expressed by the Department of Natural Resources, and DER's rules have not adopted a specific requirement regarding a ratio between the length of a project's shoreline and the number of permittable boat slips. On July 16, 1986, the Department received a letter from the FWS concerning fisheries issues and navigation. This FWS letter was received after issuance of DER's Intent to Issue. Although DER considered these comments, DER disagreed with the FWS's recommendations regarding these issues. Water quality sampling and analysis showed that at present, there are no violations of DER's Class III water quality standard in DeBary Bayou, except for the dissolved oxygen criterion on some occasions during early-morning hours, and that result is to be expected. It is further not expected that there will be any water quality violations after the project is completed. If the work areas affected by driving piles to build floating docks and the work area around the maintenance dredging of the DeBary Bayou channel are contained within turbidity barriers, as required by general and specific conditions of the DER's proposed Draft Permit, it is anticipated that no violations of the Class III turbidity criterion will occur during construction of Arbors' project. By maintenance dredging the former DeBary Bayou channel, Arbors will remove the silt and sediment overburden from the channel and restore a deep (four to five feet below mean sea level) channel having a hard sand/fragmented shell bottom. Arbors' dock will be restricted to small boats whose operation in the deep channel will be unlikely to re-suspend silt and sediment and cause violations of the Class III turbidity criterion. Additionally, it is unlikely that any turbidity which is created by turbulence from boat propellers in a designated "No Wake, Slow Speed" zone will violate the Class III turbidity criterion. Although the entire project will be enhanced by the proposed maintenance dredging, such dredging is not a part of the permit application. From the evidence it appears that the project is permittable without the dredging. Although Arbors' project will result in the addition of some oils and greases associated with outboard motors to DeBary Bayou, the addition is not expected to result in violations of the Class III water quality standards. Additionally, release of heavy metals from anti-fouling paints should be minimal, and that release can be further controlled by specifically prohibiting over-water repair of boats and motors. Some addition of phosphorous to the waters of DeBary Bayou is anticipated due to use of phosphate-based detergents for washing boats. Additionally, minimal amounts of phosphorous may be added to DeBary Bayou from re-suspension of organic silts by turbulence from boat propellers. However, DER has no standards for phosphorous in fresh waters, and the minimal additional amounts of phosphorous expected from these sources are not anticipated to violate DER's general nutrient rule. Operation of boats at Arbors' proposed boat docks will cause no water quality problems which would not be caused by operation of boats at any other marina anywhere in Lake Monroe or anywhere else in the State of Florida. While WVC's expert, Robert Bullard, testified that Arbors' proposed boat docks could potentially cause violation of DER's Class III water quality criteria for turbidity, oils and greases, heavy metals and phosphorous, he was unable to testify that Arbors' project actually would cause such violation. His testimony in this regard was speculative and is not given great weight. No other WVC expert testified that Arbors' project was likely to cause violation of any criteria of DER's Class III water quality standards. It is anticipated that the shade cast by the boat docks will not have an adverse affect on water quality. Additionally, DeBary Bayou is a clear, spring-fed water body open to direct sunlight. The boat docks will cast shade which will enhance fish habitat. The proposed docks will not threaten any production of fish or invertebrate organisms. The mitigation plan proposed by the applicant and accepted by Volusia County and DER requires planting wetland hardwood tree species. These trees will certainly assist in stabilizing the bank of DeBary Bayou and minimizing erosion of the shoreline. Additionally, these trees will absorb nutrients from the water and will perpetuate the wooded wetland habitat along the DeBary Bayou shoreline. Arbors' own expert, Carla Palmer, also suggested the sprigging of eel grass in the dredged portion of DeBary Bayou. Such planting should be included as part of the mitigation plan. DER considered the cumulative impact of this docking facility. Four marinas are presently permitted on Lake Monroe and in the St. Johns River between Lake Monroe and Deland. DER considered these facilities' existence when it reviewed Arbors' application, and was satisfied that Arbors' boat dock facility would not have an adverse cumulative impact. There are no specific guidelines for a cumulative impact evaluation; accordingly, DER must apply its cumulative impact evaluation on a case-by-case basis. In the present case, there is no showing of adverse cumulative impacts from this project. Arbors' project will not adversely affect significant historical or archaeological resources recognized pursuant to applicable Florida or Federal Law. WVC was organized in March 1985, to oppose development in West Volusia County. WVC did not meet regularly and did not keep regular minutes of its meetings in the interim between organizing and filing the Petition in June 1986, for an administrative hearing on the Intent to Issue a permit for Arbors' project. When the Petition was filed, WVC did not have a membership roll, and was unsure how many members it had. Further, it is unclear as to how many members may have attended an "emergency" meeting to authorize filing said Petition. Approximately five months after said Petition was filed, WVC was incorporated and approximately nine months after the Petition was filed, WVC compiled a list of the people who were WVC members in June 1986. The emergency meeting WVC held in June 1986, to authorize filing said Petition was the first and the only such "emergency" meeting WVC ever held. The minutes of the emergency meeting have been lost. In June 1986, WVC may have had written rules authorizing emergency meetings and authorizing it to file suit, but its Chairman is unsure of this. Six of WVC's approximately 20 members may have lived within one mile of Arbors' project site in June 1986. Two of these members lived on waterfront property on Lake Monroe east of the 1-4 bridge. Some of these WVC members have never taken a boat west of 1-4 onto DeBary Bayou. WVC, as an organization, never sponsored outings or boat trips onto DeBary Bayou before filing the Petition. WVC's officers at the time of filing the Petition did not use DeBary Bayou for boating, fishing or swimming. No WVC members have ever seen manatees in DeBary Bayou. As with any other similar project on Lake Monroe, the boats which might be berthed at Arbors' project might add additional trash to the waters of Lake Monroe, might disturb the wildlife which WVC members might see on their property, and might cause wakes which might erode waterfront property. One of WVC's founders, who was an officer in June 1986, when WVC filed the Petition, stated that she would not be adversely affected in kind or degree any more than any other taxpayer in Florida. Friends timely intervened and its intervention was authorized by its membership at a regularly noticed meeting.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order granting Permit Number 64-114399-4, subject to those specific conditions set forth in paragraph 6 hereof and as modified by the stipulation entered into between Arboretum, Volusia County, and Department of Environmental Regulation, as more particularly described in paragraphs 7 and 8 hereof, and to include within the mitigation plan the sprigging of eel grass in areas of the dredged portion of DeBary Bayou. DONE AND ENTERED this 16th day of September 1987, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 16th day of September 1987. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 86-2463 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner and Intervenor, West Volusia Conservancy, Inc., and Friends of the St. Johns, Inc. 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(3); 2(5); 8(24); 13(8); 46(57); and 47(57). 2. Proposed findings of fact 3, 4, 7, 10, 11, 12, 28, 29, 32, 34, 35, 36, 40, 42, 43, 44, and 45 are rejected as being subordinate to the facts actually found in this Recommended Order. 3. Proposed findings of fact 5, 14, 15, 16, 17, 20, 23, 24, 25, 26, 27, 30, 31, 33, 39, and 41 are rejected as being unsupported by the competent, substantial evidence. 4. Proposed findings of fact 6, 9, 18, 19, 21, 22, 37, and 38 are rejected as irrelevant. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Bayou Arbors, Inc. 1. Each of proposed findings of fact 1-56 are adopted in substance as modified in the Recommended Order, in Findings of Fact 1-56. Specific Rulings on Proposed Findings of Fact Submitted by Respondent, Department of Environmental Regulation Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-11(1-11); 13-28(12-27); 29-38(29-38); 39(38); and 40-48(39-47). Proposed finding of fact 12 is rejected as unnecessary. COPIES FURNISHED: Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Richard S. Jackson, Esquire 1145 West Rich Ave. Deland, Florida 32720 Dennis Bayer, Esquire P. O. Box 1505 Flagler Beach, Florida 32036 Philip H. Trees, Esquire P. O. Box 3068 Orlando, Florida 32802 Vivian F. Garfein, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301-8241
The Issue The issue here presented concerns the entitlement of the Applicant/Respondent, Walker G. Miller, to construct an addition to his existing boat house of approximately 450 square feet, and an addition to his existing chain link fence, both of which are located on Lake Down, Florida. The Respondent, Department of Environmental Regulation, has indicated its intention to grant the permit application request and the Petitioners, Milton and Gail Hess, and David Storey and others, have opposed the Department's intention to grant the permit.
Findings Of Fact The Petitioner in Case No. 80-1769, Milton Hess, is an adjacent landowner to the Applicant/Respondent, Walker G. Miller, with property located on Lake Down, near Windermere, in Orange County, Florida. The Petitioners in Case No. 80-1770, David Storey and others, are also landowners on Lake Down. Applicant's parcel is located on Down Point, which is a peninsular extending from the Lakes's southern shore. The project as contemplated by the Applicant is the construction of a 15 foot by 30 foot unenclosed addition on the north side of an existing dock/boathouse combination located on Lake Down. The 450 square foot addition is to be utilized as a storage room adjacent to the boathouse portion of his existing structure. The present structure has a total surface area of approximately 825 square feet. Additionally, by amendment to the application made on August 13, 1980, Applicant proposes to construct a chain link fence from the south property line to the dock facility. Lake Down is one of the waterbodies that constitutes the Butler Chain- of Lakes. The Lake is characterized by outstanding water quality and diversified biological resources. The Chain-of Lakes is widely recognized as the outstanding aquatic resource in the State, as far as water quality is concerned. Development on Lake Down is light, with widely scattered residential units separated by expanses of citrus groves. The construction of the addition will not significantly impact Lake Down or the Butler Chain-of Lakes, either on a long-term or short-term basis. The shading effect of the structure will result in a slight decline of rooted aguatic vegetation. However, such decline should be minimal. Further, reasonable assurances have been given that the proposed project would not result in any violations of State water quality criteria or standards. The existing dock structure now obstructs a portion of the view of the lake enjoyed by Petitioner Hess. However, by constructing the proposed addition on the north side of the existing boathouse, no further impediment of the view will occur.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a permit be granted by the Department of Environmental Regulation to Walker G. Miller to construct an addition to his boathouse and a chain link Fence on Lake Down as more specifically described in his amended application. DONE and ENTERED this 2nd day of February, 1981, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of February, 1981. COPIES FURNISHED: David Storey Route 3, Box 929 Orlando, Florida 32811 Jack Ezzard and Kathryn Ezzard Route 3, Box 925 Orlando, Florida 32811 Tari Kazaros Route 3, Box 924 Orlando, Florida 32811 Mrs. H. D. Barrarly Post Office Box 203 Gotha, Florida 32734 Paula M. Harrison Post Office Box 203 Gotha, Florida 32734 Ava Careton Route 3, Box 926 Orlando, Florida 32811 Nikki Clagh Route 3, Box 928 Orlando, Florida 32811 Milton and Gail Hess 4413 Down Point Lane Windermere, Florida 32786 Walker G. Miller Post Office Box 348 Windermere, Florida 32786 B. J. Heller, Esquire 644 West Colonial Drive Orlando, Florida 32804 Richard D. Lee, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301
Findings Of Fact On December 9, 1982, Petitioner filed with Respondent a dredge and fill permit application to remove gates and wing-walls from a double-lock canal system presently installed at the Palmetto Point Subdivision in Lee County, Florida, adjacent to the Caloosahatchee River. On January 6, 1983, Respondent sent a "completeness summary" to Petitioner, along with a letter advising Petitioner that its permit application was incomplete, and requesting additional information. Petitioner responded to the January 6, 1983, completeness summary by submitting additional information to Respondent on or about February 23, 1983. On March 21, 1983, Respondent sent a second completeness summary requesting further additional information from Petitioner. By letter dated May 18, 1983, Petitioner's attorney advised Respondent that submission of additional requested hydrographic information and water quality data was not justified. The letter further advised that Petitioner intended to rely on the information already submitted, and requested, pursuant to Section 403.0876, Florida Statutes, that Respondent begin processing the permit application. The letter further indicated that petitioner was submitting under separate cover a request that Respondent apply the "moderating provisions" of Rule 17-4.244, Florida Administrative Code, to the application. The aforementioned rule is entitled "Mixing Zones: Surface Waters." Also on May 18, 1983, Petitioner's counsel sent another letter to Respondent requesting the aforementioned "Mixing Zone." The letter requested the "maximum mixing zone" allowed under the applicable Provisions of Rule 17- 4.244, Florida Administrative Code. Petitioner had not requested a mixing zone be applied to the permit application prior to the request contained in its May 18, 1983, letter. By letter dated June 17, 1983 Respondent, in response to Petitioner's May 18, 1983, letters, advised that: The additional information [which] was received on May 19, 1983, was reviewed; however, the items listed on the attached sheet remain incomplete. Evaluation of your proposed project will continue to be delayed until we receive all requested information. Respondent's June 17, 1983, letter included a completeness summary, which asked for additional information, including the following requests concerning mixing zones: Your request for a mixing zone is applicable pursuant to F.A.C. Rule 17-4.244(6). Please provide a map indicating the outermost radius of the mixing zone (no more than 150 meters) and the period of time required. The completeness summary acknowledged Petitioner's refusal to supply additional information concerning hydrographic data and water quality information, and indicated that Respondent would evaluate the project accordingly. By letter dated August 29, 1983, Respondent advised Petitioner that it had been 73 days since notification of the incompleteness of the permit application with regard to the mixing zone request. This letter requested Petitioner to advise Respondent if it wished to withdraw the application, request additional time, or discuss questions regarding the application. The Petitioner did not respond to this communication. On September 9, 1983, Petitioner's attorney forwarded a letter to Respondent requesting a default permit pursuant to Sections 120.60(2) and 403.0876, Florida Statutes. Until this letter, other than a prior oral communication on September 2, 1983, notifying Respondent that the default request was forthcoming, Petitioner had not contacted Respondent concerning the permit application since its May 18, 1983, letters. On October 13, 1983, Respondent advised Petitioner by letter that the mixing zone request constituted a revision of the application and that the information received to evaluate the mixing zone request was incomplete. Petitioner was also advised that since the additional information requested had not been received, the application remained incomplete and Petitioner was not entitled to a default permit. Whether or not a mixing zone is applied to a permit application is significant because it determines where state water quality standards must be met, either adjacent to the proposed project, or up to 150 meters away from the project location. Under Rule 17-4.244(6), Florida Administrative Code, the 150 meter radius is measured from the point of generation of turbidity or pollution. Since the two locks to be removed were 80 feet apart, it was unclear whether Petitioner intended the point of generation for measuring the radius of the mixing zone to be the northern lock, the southern lock, or some other point. It is equally unclear whether Petitioner intended the mixing zone to extend south into the canal as well as north into the Caloosahatchee River. Petitioner never contacted Respondent to clarify the dimensions of the mixing zone being sought, even after Respondent requested a map indicating the outermost limits of the mixing zone in the June 17, 1983, completeness summary.
Findings Of Fact At all times to the issues herein the Department of Environmental Protection was the state agency in Florida responsible for the regulation of water pollution and the issuance of dredge and fill permits in the specified waters of this state. Mr. Byrd has been a resident of the City of Treasure Island, Florida for many years and resides at 123 123rd Avenue in that city. His property is located on Boca Ciega Bay next to a public boat ramp operated by the City. On April 12, 1995, the City of Treasure Island applied to the Department of Environmental Protection for a permit to construct a dock six feet wide by seventy-five feet long, located on the edge of its property on which the public boat ramp is located. This property is located in a basin off Boca Ciega Bay, which is classified as a Class III Outstanding Florida Water. The dock involves the placement of pilings in the water, and the construction of a walkway thereon. In order to be obtain a permit, the applicant must provide the Department with reasonable assurances that the proposed project will not degrade water quality and will be in the public interest. The project is permanent in nature, but the temporary concerns raised by construction have been properly addressed in the permit. In the instant case, the dock is intended to accommodate the boating public which will utilize it to more safely launch, board, debark, and recover small boats at the ramp in issue. The dock will be equipped with a hand rail which will increase the safety of the project. Evidence establishes that without the dock, boaters have to enter the water to launch and recover their boats on a ramp can be slippery and dangerous. The site currently in use as a boat ramp, a part of which will be used for the dock, is almost totally free of any wildlife. No evidence could be seen of any sea grasses or marine life such as oysters, and there was no indication the proposed site is a marine habitat. Manatees do periodically inhabit the area, and warning signs would be required to require construction be stopped when manatee are in the area. The water depth in the immediate area and the width of the waterway is such that navigation would not be adversely impacted by the dock construction, nor is there any indication that water flow would be impeded. No adverse effect to significant historical or archaeological resources would occur and taken together, it is found that the applicant has provided reasonable assurances that the project is within the public interest. Concerning the issue of water quality, the applicant has proposed the use of turbidity curtains during construction which would provide reasonable assurances that water quality would not be degraded by or during construction. The water depths in the area are such that propeller dredging and turbidity associated therewith should not be a problem. No evidence was presented or, apparently is on file, to indicate any documented water quality violations at the site, and it is unlikely that water quality standards will be violated by the construction and operation of the structure. The best evidence available indicates there would be no significant cumulative impacts from this project. Impacts from presently existing similar projects and projects reasonably expected in the future, do not, when combined with the instant project, raise the possibility of adverse cumulative degradation of water quality or other factors of concern. By the same token, it is found that secondary impacts resulting from the construction of the project would be minimal. It is also found that this project is eligible for an exemption from the requirements to obtain a permit because of the Department's implementation on October 3, 1995 of new rules relating to environmental resources. However, the City has agreed to follow through with the permitting process notwithstanding the exemption and to accept the permit including all included conditions. This affords far more protection to the environment than would be provided if the conditions to the permit, now applicable to this project, were avoided under a reliance on the exemption to which the City is entitled under current rules. To be sure, evidence presented by Mr. Byrd clearly establishes the operation of the existing boat ramp creates noise, fumes, diminished water conditions and an atmosphere which is annoying, discomfiting, and unpleasant to him and to some of his neighbors who experience the same conditions. Many of the people using the facility openly use foul language and demonstrate a total lack of respect for others. Many of these people also show no respect for the property of others by parking on private property and contaminating the surrounding area with trash and other discardables. It may well be that the presently existing conditions so described were not contemplated when the ramp was built some twenty years ago. An increase in population using water craft, and the development and proliferation of alternative watercraft, such as the personal watercraft, (Ski-Doo), as well as an apparent decline in personal relations skills have magnified the noise and the problem of fumes and considerably. It is not likely, however, that these conditions, most of which do not relate to water quality standards and the other pertinent considerations involved here, will be increased or affected in any way by the construction of the dock in issue.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of Environmental Protection issue to the city the requested permit to construct the dock in issue at the existing public boat ramp at the east end of 123rd Avenue right of way in the City of Treasure Island. RECOMMENDED this 12th day of December, 1995, in Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of December, 1995. COPIES FURNISHED: Ronald Schnell, Esquire 3535 First Avenue North St. Petersburg, Florida 33713 James W. Denhardt, Esquire 2700 First Avenue North St. Petersburg, Florida 33713 Christine C. Stretesky, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virginia B. Wetherell Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kenneth Plante General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
The Issue This case involves a challenge to St. Johns River Water Management District’s (District or SJRWMD) intended issuance of an Environmental Resource Permit (ERP) granting the City's Application No. 4-127-97380-1, for the construction and operation of a surface water management system for a retrofit flood-relief project known as Drysdale Drive/Chapel Drive Drainage Improvements consisting of: excavation of the Drysdale Drive pond (Pond 1); improvement to the outfall at Sterling Lake; and the interconnection of Pond 1 and four existing drainage retention areas through a combination of pump stations and gravity outfalls (project or system). The issue is whether the applicant, the City of Deltona (City or Deltona), has provided reasonable assurance the system complies with the water quantity, environmental, and water quality criteria of the District’s ERP regulations set forth in Chapter 40C-4, Florida Administrative Code,1 and the Applicant’s Handbook: Management and Storage of Surface Waters (2005) (A.H.).2
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order issuing to the City of Deltona an ERP granting the City's Application No. 4-127-97380-1, subject to the conditions set forth in the Technical Staff Report. DONE AND ENTERED this 17th day of March, 2006, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of March, 2006.
Findings Of Fact Petitioner owns property adjacent to Sims Creek located in Palm Beach County, Florida. Petitioner is undertaking a development on the property. The development was initiated by the Great American Anvil Corporation, the previous owner of the property. The development as originally conceived included construction of a dock in Sims Creek. The Great American Anvil Corporation applied for a permit to the State Board of Trustees of the Internal Improvement Trust Fund. On February 5, 1975, a permit was issued to allow Great American Anvil Corporation "to construct eight (8) finger piers each twenty feet long by two feet wide, and three triangular piers twenty feet long by five feet wide at the base and two feet wide at the top" in Sims Creek. The permit was issued for construction of the docking facility and by its terms expired on a specified date. The permit was never assigned or transferred to Petitioner. The permit has expired, and is no longer effective. A bulkhead has already been constructed along Petitioner's property. Petitioner is seeking a permit which would authorize it to construct a perimeter dock which would run along the approximately three hundred foot border of Petitioner's property and Sims Creek, and extend four feet over Sims Creek. Petitioner is also seeking to construct ten piers out from the perimeter dock, each of which would be twenty-five feet long and two feet wide. Mooring spaces would be provided for sixteen or more boats The perimeter dock and the ten piers would be supported by pilings which would be placed in the creek bottom. The permit application provides that the pilings would be installed by a process called "jetting". Sims Creek is a natural, navigable tributary of the Loxahatchee River. The mouth of Sims Creek on the Loxahatchee River is located in fairly close proximity to where a canal known as the "C-18 Canal" empties into the river. Sims Creek is a winding stream which has been relatively undisturbed by development. Petitioner's project is located approximately one thousand to fourteen hundred linear feet upland from the mouth of the creek. Approximately five hundred feet upland from the proposed docks, the creek veers sharply to the south and becomes significantly more shallow. The creek is influenced by both estuarine and tidal flows. During high tides, water flows from the Loxahatchee River upland into the creek. During low tides the water flows out of the creek into the Loxahatchee River. In addition, water generally drains through the creek into the river. The creek has good flushing characteristics. The "residence time" for water in the creek is typically one day, except in isolated pockets along the shoreline, and in deeper basins which occur in the creek. The area of the creek where the proposed docks would be constructed is a basin area. Waters reach a depth of eight feet. This area of the creek is stressed in water quality terms. Dissolved oxygen values measured at the site are in excess of Department standards. This is the result of the depth at the location; the oozy, organic bottom soils; and the fact that a storm water outfall and a sewage outfall enter the creek on the opposite side from Petitioner's property. The creek is generally more shallow than in this basin area. Near to the mouth of the creek, water depths are as shallow as 2.25 feet during high tide. The deepest continuous channel from the proposed docks to the mouth of the river is approximately three feet at high tide, and from one to one and one-half feet at low tide. The shallower areas of the creek are characterized by sandy bottoms, good water quality, and a rather high level of plant and animal activity which is diverse. Shorelines along most of the creek are dominated by mangrove vegetation. There is presently a limited amount of boating activity that occurs in the creek. Persons who testified at the hearing witnessed at various times from one to seven small motor craft in the creek. Construction of the perimeter dock and piers in the manner proposed by Petitioner in its application would have significant adverse short term water quality impacts. The "jetting process" for installing pilings would result in considerable turbidity which would be likely to violate state standards within the area of construction, and downstream to the mouth of the creek. These short term adverse impacts could be alleviated by installing the pilings through a "driving technique" and by use of turbidity screens. Petitioner has expressed a willingness to utilize these construction techniques. The proposed docking facility is likely to have an adverse impact upon water quality in Sims Creek. The project, if completed, is likely to cause violations of the Department's water quality standards. Dissolved oxygen levels in the area of the proposed project already exceed the Department's standards. The Petitioner's proposed docks would cover a significant portion of the water surface with docks, and this would exacerbate dissolved oxygen levels. Furthermore, increased boating activity in the area would, due to the interjection of greases and oils, further adversely impact dissolved oxygen levels, and can reasonably be expected to lead to violations of the Department's standards for biologic oxygen demand and oils and greases. Petitioner's proposed docking facility includes mooring spaces for approximately sixteen boats. The dock would serve therefore to increase boating activity in Sims Creek by three times or more Sims Creek is difficult to navigate without disturbing the productive shallow bottom areas. Increased boating activity is likely to disturb these areas and to lead to the destruction of a natural marine habitat. Sims Creek is too shallow a water body to sustain the sort of boating traffic that would be generated through construction of a docking facility such as Petitioner has proposed. Sims Creek is sovereignty land of the State of Florida. Petitioner has not received approval from the Board of Trustees of the Internal Improvement Trust Fund or the Department of Natural Resources to use Sims Creek in the manner proposed.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, hereby, RECOMMENDED: That a final order be entered by the Department of Environmental Regulation denying the application submitted by Landin Ltd, for a dredge and fill permit to construct a docking facility in Sims Creek, West Palm Beach, Florida. RECOMMENDED this 5th day of April, 1982, in Tallahassee, Florida. G. STEVEN PFEIFFER Assistant Director Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of April, 1982. COPIES FURNISHED: Dennis R. Johnson, Esquire 308 Tequesta Drive Tequesta, Florida 33458 Alfred J. Malefatto, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301