Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
DR. ROBERT B. TOBER vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 95-000159 (1995)
Division of Administrative Hearings, Florida Filed:Naples, Florida Jan. 13, 1995 Number: 95-000159 Latest Update: Jun. 23, 1995

Findings Of Fact By Joint Application for Works in the Waters of Florida filed June 22, 1994, Petitioner requested a permit to dredge about 500 square feet of uplands for a boatslip and to maintenance dredge 1700-1900 square feet in an adjacent canal, removing 125 cubic yards of material waterward of mean high water. The Application describes the work as including a vertical concrete seawall running 92 feet inside the boatslip, a cat walk from the boatslip to the canal, and a roof over the boatslip. A drawing attached to the Application depicts the proposed boatslip at the east end of the Petitioner's lot and with rounded corners to facilitate flushing. By Notice of Permit Denial executed October 24, 1994, Respondent advised that the permit was denied. The Notice states that water quality in the surrounding canal system is generally poor with low dissolved oxygen (DO) levels. The shoreline vegetation is primarily mangroves, which are tall but not robust. The proposed dredge area consists of a healthy littoral shelf with live oysters and shells. Based on the foregoing site description, the Notice denies the permit because of impacts to the conservation of fish and wildlife and marine productivity and a degradation of the current condition and relative value of the affected area. The Notice relates all of these factors to the loss of the mangroves and dredging of the adjacent canal bottom. The Notice adds that the project would have an adverse cumulative impact on water quality and public resources if similar projects were constructed. In the alternative, the Notice suggests that Petitioner eliminate the dredging into the uplands and canal and instead construct a boat shelter in the canal in an area of existing adequate water depth. By letter dated November 7, 1994, Petitioner challenged the denial. The letter states that Petitioner has maintained an environmentally productive shoreline consisting of mangroves, oysters, and rip rap, rather than concrete seawalls, as are found along the shoreline of most of his neighbors. The letter suggests that, if Petitioner followed Respondent's suggestion and built a slip in the canal, Petitioner would be permitted to do maintenance dredging in the artificial canal. The letter concludes that the maintenance dredging and shading of an over- the-water boathouse would have more impact on the environment than dredging uplands and a small access channel to the slip. Petitioner's residence is located in Aqualane Shores, which is an established residential subdivision located between Naples Bay on the east and the Gulf of Mexico on the west. Petitioner's lot is located about two-thirds of the distance down a long, relatively wide artificial canal known as Jamaica Channel. Jamaica Channel intersects Naples Bay to the east of Petitioner's property. Jamaica Channel is a Class III waterbody. Petitioner owns about 200 feet of shoreline at the corner of Jamaica Channel and a shorter, narrower canal. The entire area is heavily canalized and completely built-out with nearly exclusively single family residences. Most of the shoreline in the area is bulkheaded with concrete seawalls. Jamaica Channel was dredged in the early 1950s. Early riprap revetment crumbled into the water and in some areas became colonized by oysters, which supply food and filter impurities from water. Shoreline owners weary of repairing riprap installed vertical seawalls, thereby destroying the oyster beds and intertidal habitat. But much of the riprap adjacent to unbulkheaded shoreline eventually was stabilized by mangrove roots. The absence of concrete seawalls along Petitioner's shoreline has permitted a significant colony of oysters to populate the 25-foot littoral shelf running along Petitioner's shoreline. The oysters form a hemisphere, thickest at the middle of Petitioner's shoreline and narrowest at the east and west edges, narrowing to a width of as little as 6-10 feet. In recent years, Australian pines were removed from Petitioner's shoreline. As a result, mangrove seedlings have successfully occupied much of the shoreline. The proposed boatslip would be located at the east end of the shoreline where there is a natural gap in the mangroves. As a result, only three mangroves would have to be removed, and a relatively narrow band of oysters would be dredged and, as offered by Petitioner, relocated. The proposed dredging involves uplands and submerged bottom. As to the uplands, Petitioner intends to create a slope in the slip with the rear one to one and one-half feet shallower than the front, although this slope is not reflected on the Application. The purpose of the slope is to facilitate flushing. Petitioner evidently intends to dredge sufficient material to fill the rear of the slip with two feet of water at mean water and the front of the slip with three feet of water at mean water. The dredging in Jamaica Channel would involve an 18-20 foot wide path leading to the slip. Beyond the oysters, the bottom is fine sandy substrate with scattered rock. The relocation of oyster-covered rocks might be successful, if there are sufficient areas suitable for colonization that have not already been colonized. However, the dredged areas would not be recolonized due to their depths. Presently, the Application discloses level dredging down to an elevation of -5 NGVD. Petitioner's intent to slope the boatslip has been discussed above. Although Petitioner did not reveal a similar intent to slope the area dredged in Jamaica Channel, Petitioner's witness, Naples' Natural Resource Manager, testified that he would insist on similar sloping the entire length of the dredged area, so that the deepest area would be most waterward of the boatslip. If the dredged canal bottom were not sloped, Petitioner proposes removing about 4.25 feet of material about ten feet from shore, about 3.4 feet of material about 22 feet from shore, about 1.8 feet of material about 30 feet from shore, and about 0.5 feet of material about 40 feet from shore. Petitioner did reveal that the cross-section indicating a dredged depth of -5 feet applies only to the centerline of the dredge site, which would be tapered off to the east and west. The slope of the taper was not disclosed, but it is evident that the affected areas within 20 feet of the shoreline would be dredged at least two feet deeper and, in most areas, three feet deeper. The deepening of Jamaica Canal in the vicinity of the shoreline would not only eliminate existing oyster habitat, but would also eliminate habitat currently used by small fish. The deepening of Jamaica Channel in the vicinity of the shoreline would also impact water quality in the area. Water quality in Naples Bay and Jamaica Channel is poor and violates water quality standards for DO. Due to poor mixing of freshwater infusions and saltwater, DO levels deteriorate with depth. Where DO levels are probably adequate in the shallows around Petitioner's shoreline, the proposed dredging would likely result in depths at which violations could be expected to occur. Petitioner offers to install an aerator to introduce oxygen into the water. Ignoring the fact that the aerator was to operate only in the boatslip and not in the remainder of the dredged area, Petitioner did not show the effect on DO levels of this proposal. Even if the aerator had been shown to result in a net improvement in area DO levels, Petitioner also failed to show how the operation of the aerator would be guaranteed to extend indefinitely, or at least until the dredged areas were permitted to regain their pre-dredged depths. Petitioner argues that he could construct an over-the- water boathouse and maintenance dredge, and the resulting environmental impact would be greater. Several factors militate against this proposed alternative and thus preclude consideration of this alternative against the proposed project. Most significantly, the oysters have occupied the littoral shelf adjacent to Petitioner's shoreline for a period in excess of 20 years. There is considerable doubt as to whether Petitioner would be permitted to maintenance dredge under these and other circumstances. Respondent argues more persuasively the issue of cumulative impacts. There are about 350 residences in Aqualane Shores, of which only 150 have boatslips similar to that proposed by Petitioner. This raises the prospect of an additional 200 boatslips as a cumulative impact on water and biological resources.

Recommendation It is hereby RECOMMENDED that the Department of Environmental Protection enter a final order denying the application. ENTERED on May 26, 1995, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on May 26, 1995. APPENDIX Rulings on Petitioner's Proposed Findings 1-2: adopted or adopted in substance. 3: rejected as irrelevant. 4-5 (first sentence): adopted or adopted in substance. 5 (remainder)-6: rejected as irrelevant. 7: rejected as recitation of evidence. 8: adopted or adopted in substance. 9: rejected as unsupported by the appropriate weight of the evidence. 10: rejected as unsupported by the appropriate weight of the evidence, irrelevant, and not findings of fact. 11-12 (first sentence): adopted or adopted in substance. 12 (remainder): rejected as recitation of evidence and as unsupported by the appropriate weight of the evidence. 13: rejected as unsupported by the appropriate weight of the evidence. Rulings on Respondent's Proposed Findings 1-20: adopted or adopted in substance. 21-25: rejected as unnecessary. 26-29: adopted or adopted in substance. 30: rejected as unnecessary. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Miles L. Scofield Qualified Representative Turrell & Associates, Inc. 3584 Exchange Ave., Suite B Naples, FL 33942 Christine C. Stretesky Assistant General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (2) 120.57373.414 Florida Administrative Code (1) 62-312.030
# 2
BURNT STORE ISLES ASSOCIATION, INC. vs W. B. PERSICO AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-003093 (1990)
Division of Administrative Hearings, Florida Filed:Port Charlotte, Florida May 21, 1990 Number: 90-003093 Latest Update: Nov. 09, 1990

The Issue The issue for consideration in this hearing is whether the Respondent, W. B. Persico, should be issued a permit to construct a commercial marina as described in the Department's Intent to Issue, in Class III waters of the state in Charlotte County, Florida.

Findings Of Fact At all times pertinent to the issues herein, the Petitioner, Burnt Store Isles Association, Inc., was an association of property owners whose property is located in the Burnt Store Isles subdivision located in Charlotte County, Florida. The applicant, W. B. Persico, is the owner of a piece of property located adjacent to the subdivision and applicant for a permit to construct a marina on his property. The Department of Environmental Regulation is the state agency responsible for the regulation and permitting of dredge and fill activities in the waters of the state. Mr. Persico's property is located on a dead end basin canal in Charlotte County, Florida. The canal is a Class III water but is not classified as an Outstanding Florida Water. On July 31, 1989, Mr. Persico applied to the Department for a permit to construct a 75 slip, 5660 square foot commercial marina on his property within this artificial, dead end basin. Because of objections by the Department to several aspects of the proposed project, on February 27, 1990, Mr. Persico submitted a modification proposal in which he eliminated the use of pressure treated lumber for pilings, substituting concrete pilings; incorporated boat lifts in each slip; reduced the number of slips from 75 to 65; committed himself to installing a sewage pump-out facility at the site; committed to creating an inter-tidal littoral shelf planted with mangroves; agreed to face the existing vertical bulkhead seawall in the basin with rip-rap; and incorporated a commitment to include, as a part of his rental contract, long term agreements prohibiting vessel maintenance and liveaboards on boats at the site, and insuring the perpetual use of boat lifts and pump out facilities provided. He now proposes to market the marina as a condominium ownership operation. The basin in which the Persico project is proposed is 136 feet across at the entrance, (the narrowest point), and 326 feet across at the widest point. The length of the basin is more than 900 feet. The docking structure to be created will have fingers extending no more than 39 feet into the water from the existing vertical seawall. It will have a 4 foot wide walkway parallel to and 10 feet from the existing seawall from which the arms will extend 25 feet into the basin. The basin which is the proposed location for the marina is at the end of the easternmost canal in the Burnt Store Isles subdivision. It is located just west of and parallel to US Route 41, and at the entrance point, joins a perimeter waterway which meanders approximately 1 mile seaward toward a lock which joins that waterway to Alligator Creek which is an Outstanding Florida Water. The waterway from the basin through the lock into Alligator Creek and thereafter to the Gulf provides the only navigable access for most vessels moored in the Burnt Store canals and which would be moored in the proposed marina between Charlotte Harbor and the Gulf of Mexico. The lock which joints the Burnt Store canals to Alligator Creek consists of two hydraulically operated swinging gates which are operated by a boater entering or exiting the canal system. This lock was constructed as a part of a 1973 agreement between Punta Gorda Isles, Inc., a developer, and the state to prevent the construction and runoff polluted waters of the canal from freely mingling with the Outstanding Florida Water in Alligator Creek. The lock is now maintained in an open position from November 15 to May 15 because boaters complained of the inconvenience of having to operate the lock system. Available evidence indicates that a complete passage through the lock, one way when closed, takes 15 minutes. No more than 24 boats can complete a round trip in a 12 hour boating day. When the lock is open there is no appreciable delay. The residential lots which abut the Burnt Store canals are still mostly vacant. The City of Punta Gorda has assumed the responsibility of conducting a 5 year water quality monitoring program which was previously agreed to by Punt Gorda Isles, Inc. when the lock was built. The 1973 agreement was amended in 1984 to permit the operation of the lock in a closed position for an entire year if water quality monitoring should indicate a degradation of water quality in either Alligator Creek of the Burnt Store Isles canals. This has not been necessary. The Petitioners fear that pollution generated by the addition of 65 additional boats moored at and operating from the proposed marina will cause the Department to implement that clause and order the lock to operate from a closed position year round. This does not mean that the lock would not be opened for boats, but that it would be closed when not being used. Petitioners contend that the increased usage would create an intolerable traffic jam at the lock which would, for the most part, make their use of the waterway to the Gulf intolerable. Mr. Persico is a former road and bridge contractor. Though he has never owned a marina, at one time he rehabilitated one in the Chicago area. He has owned the property in question here for four years and now plans to develop a condominium ownership marina. When he decided to do so, he hired Mr. James M. Stilwell, an environmental consultant, to prepare and submit to the Department the application for the required dredge and fill permit. Initial discussions between Mr. Stilwell and the Department dealt with many environmental issues. Mr. Stilwell pointed out that the water in the canal might already be stale and avenues were explored to mitigate that problem. They did not discuss the type of docks to be installed or the potential for destruction of mangrove stands along the seawall, but even though the original plan called for the docks to be placed against the seawall, it was to be done in such a way as not to disturb the mangroves. The modified plan removing the docks to a point 10 feet off from the wall will obviate any damage to the mangroves. Admittedly, the original submittal prepared by Mr. Stilwell contained factors which were considered unacceptable to the Department. These included construction of the finger piers with pressure treated wood. To eliminate possible pollution from leaching, the pressure treated wood was replaced with a floating dock using concrete pilings. Liveaboards, and the potential contamination from that activity, have been prohibited. The provision and required use of a sewage pump-out facility should prevent any escape of polluting sewage into the waters of the basin. The use of power hoists at each slip should prevent pollution from bottom paint leaching, and boat maintenance at the marina is to be prohibited. Fueling of the vessels will not be permitted at the site thereby obviating the potential of polluting fuel spills. The construction of a 10 foot wide littoral shelf, planted with mangroves, between the dock and the sea wall will provide increased water filtration and improve water quality. It would also help the development of the fish and wildlife population and would reduce the flushing time. Air released into the water from the use of the boat lifts should add oxygen and contribute to improved water quality. At the present time, the ambient water quality in the basin, as it pertains to dissolved oxygen, is probably below standards in the lower depths of the basin, and of the outside channels as well, due to poor light penetration. The channel depth is anywhere from 20 to 25 feet. The oxygen level at the bottom is undoubtedly depleted. Mangroves are currently located along 300 feet of the 1,300 foot seawall. Mr. Stilwell's proposal, and that approved by the Department, does not call for removal of the mangroves, but they would be built around or possibly trimmed. Mr. Stilwell is of the opinion that provision for trimming of the mangroves is inherent in the granting of the permit though such permission was not specifically sought. There is no evidence to contradict this thesis. Water quality issues were raised subsequent to the filing of the original application, and the facility as now planned is designed to minimize impacts on the environment as best as can be done. Water quality would be improved, or at worst not adversely affected, by the prohibitions against liveaboards and fueling, the provision of boat lifts and a pump station, and the prohibition against other structures beyond the dock and slips. Flushing of the water is important considering the fact that the dissolved oxygen content in the water is already low. However, Mr. Stilwell is satisfied, and it would so appear, that water quality would be improved by the implementation of the proposals as included in the conditions to the permit. Mr. Stilwell, admittedly, did no dissolved oxygen tests because they were not considered as a part of the permit application. If the Department requests them, they are done, but they were not requested in this case. It is clear that the original application did not address all the environmental concerns that Petitioners feel are pertinent. Nonetheless, those items already discussed were treated, as were turbidity control during construction. As to others of concern to Petitioners, many are included in the state standards and need not be specifically addressed in the application. The Department considered the application in light of the state standards, and by the use of the conditions appended to the Intent to Issue, provided for the water quality and other environmental standards to be sufficiently addressed and met. In his February 22, 1990 letter to the Department, Mr. Stilwell directly addressed the public interest concerns including the mangroves and the construction of the littoral shelf. The Department was satisfied that the public interest criteria were met, and considered the plans to be environmentally sound. They appear to be so. Petitioners have raised some question as to the effect of the 39 foot long dock fingers interfering with navigation within the basin. Mr. Stilwell does not feel that the facility would create this problem, even at the narrowest point, and it is so found. The width of the canal there is 136 feet. The portion of the slip designed to accommodate vessels is no more than 25 feet long, and presumably, vessels of a length much greater than that would not visit the basin. Even subtracting 39 feet from the 136 feet narrow point, 97 feet of turning space remains, and this is almost four times the length of the normal vessel anticipated in the basin. Mr. Stilwell did not address the subject of the lock as it relates to navigation, but primarily as it relates to the impact on water quality and the environment. Nonetheless, he is of the opinion, and there is no evidence to the contrary, that keeping the lock open on a year round basis would not trigger a change to the ongoing program under the agreement between the state and Punta Gorda Isles and result in the lock being closed year round. Mr. Shultz, the environmental specialist with the Department, reviewed the application here initially for file completeness, and when all required information was in, made a site visit. He evaluated the application and the attachments for permitability. For Class III waters, the project must meet water quality standards outlined in the Department's rules. Only one of the water quality criteria, that of dissolved oxygen, was shown to be not met. Since the water was already below that standard, the test to be applied then is whether the project will create some improvement." In Mr. Shultz' opinion, planting the mangroves, as proposed by the applicant, does this, as does the use of the lifts. The existing mangroves will not be impacted by the project as it is proposed, and the use of rip-rap, as proposed, will provide additional surface area for organisms which will improve the water quality. When first reviewed, the Department had some concern about on-water storage of boats. These concerns were treated by the use of hoists to hold the boats out of the water when not in use, and as a result, pollutants will not be introduced by bottom paint leaching and, presumably, bilge pumping. Standard conditions included in all Department Intents to Issue, require the project to comply with applicable state water quality standards or to give assurances that such general standards for surface waters and Class III waters will be met. In this case, Mr. Shultz is satisfied that the applicant has demonstrated that water quality standards will be maintained, and there was no evidence presented by the Petitioners to contradict this. Once water quality standards are shown to be protected, then the project is balanced against the public interest criteria outlined in the statute. Here, the requirement is for a showing that the project is not contra to the public interest. It does not, because of its nature, require a positive showing that the project is in the public interest. In his opinion this project, as modified, will not adversely affect the health, safety and welfare of the public, (it will have no environmental effect on other property). It will not adversely affect the conservation of fish or wildlife in their habitats, (the planting of mangroves will provide a net improvement to species habitat in the area). The project will not adversely affect navigation, flow of water, or erosion, (the width and length of the dock system appear to pose no threat to navigation in the basin and there would appear to be no obstruction or potential therefor as a result of this project; the project is within a no-wake zone; and the size of vessels is limited by the slip size). The permit will not adversely affect marine productivity, (there is currently very little productivity in the area now since waters below 0 depth of 6 feet are already low in oxygen, and the project would, at least minimally, improve this condition). The project is permanent and would not adversely affect historical or archeological resources in the area, (there are no objects or known resources in the area, but a standard condition in the permit requires immediate notification if known resources or objects are found). The project would not adversely affect the current condition and relative value of functions being performed in the area since the area is currently a real estate development which is far from completely built. Based on his consideration of these criteria, Mr. Shultz concludes that the project is not contrary to the public interest and this appears to be a valid conclusion. There appears to be no evidence of sufficient weight, presented by the Petitioners, either through direct evidence or through cross examination of the applicant and Department witnesses that would tend to diminish the credibility of Mr. Shultz' analysis. If there are subsequent violations, the Department has enforcement action available. There is, consistent with the multiple use zoning category applied to the area across the basin from the marina, the potential for up to an additional 100 docks to be constructed in the basin beyond those treated here. Nonetheless, the Department does not consider 165 boats to be a problem either in the basin or at the lock. This is not necessarily a supportable conclusion, however. Those 100 additional docks do not currently exist and their potential should not be considered in determining whether to approve the permit under consideration here. In opposition to the applicant, Mr. Konover and Mr. Forsyth both indicated that the addition of 65 more boats would seriously overtax the operation of the lock and make it difficult, if not hazardous, to operate boats in that area between the Burnt Store Isles subdivision and Alligator Creek. Both individuals agree, and it is so found, that in general, motor boats pollute to some degree the waters on which that are operated as a result of oil leaks from engine operation, leakage of bilge oil, escape of sewage, and leaching of copper paint and other solvents. In addition, manatee have been seen in the area, and the increase of boating operations could present some hazard to the manatee population. There is, however, no indication that a manatee population is permanently in residence there or is even there frequently. It is also accepted that boat wake has an adverse effect on sea walls, and all of these factors should have been and, in fact were, considered in the analysis of the permitability of the project. The concerns of Mr. Konover and Mr. Forsyth were echoed by Mr. Gunderson who, over 30 years operating boats, has seen what he considers to be a definite lack of concern for the environment by many boaters who pump bilges directly into the water, throw debris overboard, and use detergents to wash their boats at marinas. He is of the opinion that renters of slips are generally less concerned about water quality than those who live on the water, and take a more cavalier approach to water quality standards. These sentiments are also held by Mr. Young who, over the years, has owned marinas in Connecticut and has observed the approach of nonowning slip users to the water at their disposal. His concerns could be met by the strict enforcement of standards at the marina. Mr. Powell, a nurseryman who owns the lot across the basin from the site of the proposed marina, fishes from his lot and has observed the an increase of pollution in the canal. He routinely sees floating dead fish, palm leaves, cocoanuts, bottles, slicks and other debris, and though he owns a multifamily lot, would have a difficult time putting in many slips since his lot, at the entrance to the basin at the narrow point, would be across from the slips proposed by applicant and their proximity would, he feels, hinder his ability to build out into the basin as well.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of Environmental Regulation enter a Final Order issuing Permit No. 081679445, to W. B. Persico as modified and outlined in the Intent to Issue dated March 16, 1990. RECOMMENDED this 9 day of November, 1990, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9 day of November, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-3093 The following constitutes my specific rulings pursuant to S 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: 1. & 2. Accepted and incorporated herein. 3. & 4. Accepted. Accepted but applicable only when the locks are closed. Accepted. - 9. Accepted and incorporated herein. Accepted. & 12. Accepted and incorporated in substance herein. 13. & 14. Accepted and incorporated herein. Accepted and incorporated herein. Rejected as contrary to the weight of the evidence. Accepted and incorporated herein. & 19. Accepted and incorporated herein. 20. & 21. Unsupported by convincing evidence of record. Accepted as valid when the lock is operated from a closed position. However, the evidence indicates that currently the lock is left open from November 15 to May 15 of each year and this does not cause delay. Accepted if the lock is operated from a closed position. Unsupported by convincing evidence of record. FOR THE APPLICANT: 1. - 6. Accepted and incorporated herein. 7. - 15. Accepted and incorporated herein. Accepted and incorporated herein. & 18. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. Accepted. - 32. Accepted and incorporated herein. FOR THE DEPARTMENT: Accepted. and incorporated herein. - 4. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 9. Accepted and incorporated herein. 10. - 14. Accepted and incorporated herein. 15. - 18. Accepted and incorporated herein. COPIES FURNISHED: Joseph F. Lynch Burnt Store Isles Association, Inc. P.O. Box 956 Punta Gorda, Florida 33951-0956 Michael P. Haymans, Esquire P.O. Box 2159 Port Charlotte, Florida 33949 Cecile I. Ross, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 3
LANDIN, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-002848 (1981)
Division of Administrative Hearings, Florida Number: 81-002848 Latest Update: May 19, 1982

Findings Of Fact Petitioner owns property adjacent to Sims Creek located in Palm Beach County, Florida. Petitioner is undertaking a development on the property. The development was initiated by the Great American Anvil Corporation, the previous owner of the property. The development as originally conceived included construction of a dock in Sims Creek. The Great American Anvil Corporation applied for a permit to the State Board of Trustees of the Internal Improvement Trust Fund. On February 5, 1975, a permit was issued to allow Great American Anvil Corporation "to construct eight (8) finger piers each twenty feet long by two feet wide, and three triangular piers twenty feet long by five feet wide at the base and two feet wide at the top" in Sims Creek. The permit was issued for construction of the docking facility and by its terms expired on a specified date. The permit was never assigned or transferred to Petitioner. The permit has expired, and is no longer effective. A bulkhead has already been constructed along Petitioner's property. Petitioner is seeking a permit which would authorize it to construct a perimeter dock which would run along the approximately three hundred foot border of Petitioner's property and Sims Creek, and extend four feet over Sims Creek. Petitioner is also seeking to construct ten piers out from the perimeter dock, each of which would be twenty-five feet long and two feet wide. Mooring spaces would be provided for sixteen or more boats The perimeter dock and the ten piers would be supported by pilings which would be placed in the creek bottom. The permit application provides that the pilings would be installed by a process called "jetting". Sims Creek is a natural, navigable tributary of the Loxahatchee River. The mouth of Sims Creek on the Loxahatchee River is located in fairly close proximity to where a canal known as the "C-18 Canal" empties into the river. Sims Creek is a winding stream which has been relatively undisturbed by development. Petitioner's project is located approximately one thousand to fourteen hundred linear feet upland from the mouth of the creek. Approximately five hundred feet upland from the proposed docks, the creek veers sharply to the south and becomes significantly more shallow. The creek is influenced by both estuarine and tidal flows. During high tides, water flows from the Loxahatchee River upland into the creek. During low tides the water flows out of the creek into the Loxahatchee River. In addition, water generally drains through the creek into the river. The creek has good flushing characteristics. The "residence time" for water in the creek is typically one day, except in isolated pockets along the shoreline, and in deeper basins which occur in the creek. The area of the creek where the proposed docks would be constructed is a basin area. Waters reach a depth of eight feet. This area of the creek is stressed in water quality terms. Dissolved oxygen values measured at the site are in excess of Department standards. This is the result of the depth at the location; the oozy, organic bottom soils; and the fact that a storm water outfall and a sewage outfall enter the creek on the opposite side from Petitioner's property. The creek is generally more shallow than in this basin area. Near to the mouth of the creek, water depths are as shallow as 2.25 feet during high tide. The deepest continuous channel from the proposed docks to the mouth of the river is approximately three feet at high tide, and from one to one and one-half feet at low tide. The shallower areas of the creek are characterized by sandy bottoms, good water quality, and a rather high level of plant and animal activity which is diverse. Shorelines along most of the creek are dominated by mangrove vegetation. There is presently a limited amount of boating activity that occurs in the creek. Persons who testified at the hearing witnessed at various times from one to seven small motor craft in the creek. Construction of the perimeter dock and piers in the manner proposed by Petitioner in its application would have significant adverse short term water quality impacts. The "jetting process" for installing pilings would result in considerable turbidity which would be likely to violate state standards within the area of construction, and downstream to the mouth of the creek. These short term adverse impacts could be alleviated by installing the pilings through a "driving technique" and by use of turbidity screens. Petitioner has expressed a willingness to utilize these construction techniques. The proposed docking facility is likely to have an adverse impact upon water quality in Sims Creek. The project, if completed, is likely to cause violations of the Department's water quality standards. Dissolved oxygen levels in the area of the proposed project already exceed the Department's standards. The Petitioner's proposed docks would cover a significant portion of the water surface with docks, and this would exacerbate dissolved oxygen levels. Furthermore, increased boating activity in the area would, due to the interjection of greases and oils, further adversely impact dissolved oxygen levels, and can reasonably be expected to lead to violations of the Department's standards for biologic oxygen demand and oils and greases. Petitioner's proposed docking facility includes mooring spaces for approximately sixteen boats. The dock would serve therefore to increase boating activity in Sims Creek by three times or more Sims Creek is difficult to navigate without disturbing the productive shallow bottom areas. Increased boating activity is likely to disturb these areas and to lead to the destruction of a natural marine habitat. Sims Creek is too shallow a water body to sustain the sort of boating traffic that would be generated through construction of a docking facility such as Petitioner has proposed. Sims Creek is sovereignty land of the State of Florida. Petitioner has not received approval from the Board of Trustees of the Internal Improvement Trust Fund or the Department of Natural Resources to use Sims Creek in the manner proposed.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, hereby, RECOMMENDED: That a final order be entered by the Department of Environmental Regulation denying the application submitted by Landin Ltd, for a dredge and fill permit to construct a docking facility in Sims Creek, West Palm Beach, Florida. RECOMMENDED this 5th day of April, 1982, in Tallahassee, Florida. G. STEVEN PFEIFFER Assistant Director Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of April, 1982. COPIES FURNISHED: Dennis R. Johnson, Esquire 308 Tequesta Drive Tequesta, Florida 33458 Alfred J. Malefatto, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (3) 120.5717.28253.77
# 4
SACARMA BAY AND CUDJOE OCEAN SHORES HOMEOWNERS vs. DEBRA FLYNN & DER, 84-002384 (1984)
Division of Administrative Hearings, Florida Number: 84-002384 Latest Update: May 01, 1985

Findings Of Fact The Respondent Debra Flynn has submitted an application to the DER to construct a dock extending 190 feet waterward of the mean high water line of waters of the state, which would also extend 80 feet landward of the mean high water line through a transitional wetland area. The landward extent of the dock will completely span the DER's wetland jurisdiction at the project site. A raised "pad" of fill upon which the applicant's house would be constructed and a filled driveway, although originally a part of this application, has been altered in design by the applicant such that those two items have been removed from the geographical extent of the DER's jurisdiction and those two items in the proposed project are no longer at issue. The applicant's lot is approximately 300 feet deep by 100 feet wide. This lot is one of many similarly sized lots which border Niles Channel on the east and Nyles Road on the west, on Summerland Key. These lots vary in nature from tidally inundated mangrove wetlands to a combination of upland and transitional wetlands fringed by mangroves along the water's edge. The portion of the applicant's lot nearest to Nyles Road is primarily characterized by upland vegetation extending approximately 75 to 100 feet in an easterly direction from the road. The elevation gradually decreases toward the waterfront of the lot on Niles Channel, with buttonwood (Conocarpus erecta), dropseed (Sporobolus sp.), key grass (Monanthochloe littoralis), and sea daisy (Borrichia sp.) being the dominant species over most of the applicant's lot. Over the northern side of the property adjacent to adjoining lot 34, a pocket of black mangroves (Avicennia germinans) extends inland, nearly to the upland area described above. As the lot elevation drops toward the shoreline, mangrove growth occurs more frequently, culminating in a dense mangrove fringe bordering Niles Channel. This mangrove fringe becomes well established some 30 feet landward of the approximate mean high water line, being dominated by black and white mangroves. Waterward of the mean high water line, red mangroves dominate for a distance of approximately 30 feet out into Niles Channel. The landward portion of the dock would have only minimal environmental impacts on the transitional wetlands as established by DER's expert witness Meyer and witness Kephart. No contradictory evidence was submitted in this regard. The bottom of Niles Channel extending 65 feet waterward of the mangrove fringe area is characterized by a hard caprock substrate covered with somewhat coarse sediments and loose algaes. In addition to the loose algae, the bottom, attached marine life communities are characterized by red, brown and green algae, sponges, anemones and hard corals. Waterward of this initial 65 foot zone, a relatively narrow zone of seagrasses is encountered. This zone of seagrass extends about 15 to 20 feet in width, forming a somewhat broken, noncontinuous band extending from north to south across the front of the property. Within this seagrass band, the primary growth is turtlegrass (Thalassia testudinum). There are smaller amounts of Cuban shoalweed (Halodule wrightii). Continuing waterward of this seagrass growth, the vegetative bottom coverage decreases with sandy patches becoming larger and more frequent. The bottom profile also becomes more rough and irregular, characterized by the presence of dissolved limerock holes as well as outcroppings. These holes and outcroppings provide excellent habitat for shelter-dependent fish and invertebrate species, such as spiny lobster and stone crabs. The area constitutes-prime nursery habitat for spiny lobsters and stone crabs. Water depth where the dock, as originally proposed, would terminate, which is in the area of the lobster and crab habitat, is approximately one and one-half to two feet deep at mean low water. The dock as presently proposed would extend some 30 feet beyond that area, or about 160 feet from the waterward edge of the shoreline mangrove fringe, or 190 feet from the mean high water line. Thus, the dock as presently proposed would terminate in a flat or sandy area which is somewhat deeper or about two to two and one-half feet deep at mean low water. Termination of the dock at that point, with boat traffic involved with the dock beginning and ending at that point will result in less likelihood of damage to the lobster and crab and other more fragile marine life habitat which occurs landward of the 190 foot termination point. At this point, the dominant marine species are patchy growths of red algae (Laurencia sp.). These growths are less susceptible to damage from prop-wash and wakes of boats than are the more landward areas characterized by turtlegrass, Cuban shoalweed and the "hole and outcrop" nursery habitat area for fish, lobsters and stone crabs. The physical and biological characteristics of the water bottom at this 190 foot distance offshore are more compatible with boat usage. The bottom here is characterized by hard caprock close to the surface, with a shallow overlying layer of inorganic, coarse-grained sediment consisting primarily of pulverized rock. There are very little or no seagrasses at this point. The applicant's boat draws approximately 12 inches of water underway and 18 inches at rest, and the dock is for the private use of the applicant only. The water depth at the termination point of the dock effectively precludes the applicant from navigating to and from the proposed dock with a significantly larger, more powerful boat and thus the physical characteristics of the water depth and hard bottom existing at the dock site themselves effectively limit the likelihood of harmful prop scouring or boat grounding damage. Impacts on water quality caused by the installation and operation of the proposed dock to the extent of its use by the applicant's private boat only, will be minimal. Some turbidity and disruption of marine life will inevitably occur during construction, but this will have no serious impact on either water quality or marine resources. The dock, as it is proposed to be constructed, will be at least three feet above mean high water level. It will be sufficiently narrow in width so as to preclude significant shading of seagrasses from sunlight and resultant death or damage to the seagrass beds between the end of the dock and the mean high water line, such that no water quality violation or harm to these marine resources will ensue. The proposed construction will not eliminate valuable marine resources in Niles Channel and will have no immediate or long-term adverse impact on the quantity or quality of the State's natural marine resources through the loss of habitat in the Niles Channel area involved. Because of the varying amounts of wetlands encompassed in the lots in the Niles Channel subdivision, it is unlikely that all of the lots in the area will be developed, or that a great number of docks similar to the proposed dock will be constructed. The Petitioner's expert witness, Mr. Robertson, established that less than half of the lots in this subdivision are suitable for or likely to be developed. The Petitioner's own witness, Fahrer, also established that Monroe County is planning to restrict development in this area through their zoning power. Accordingly, there is no reasonable expectation that many similar docks will be constructed in the Niles Channel area. Further, the recent amendments to the DER's organic statutes and related rules which took effect on October 1, 1984 mandate consideration of additional restrictive criteria involving effects of such projects on wildlife habitat, which will further serve to restrict development along the shoreline in this area. The shoreline in this subdivision is essentially undeveloped, with only one other dock presently in place, which is longer and extends further into Niles Channel than does the proposed dock. Although there was testimony by witnesses for Petitioner that the proposed dock would entail bone fishermen having to navigate out and around the dock, this testimony does not establish the premise that the dock will pose a serious impediment to navigation. The proposed dock may add slightly to the disruption of some recreational fishing navigation, however, since the adjacent property has the longer dock already in place, any disruption caused by this proposed shorter dock will not be significant and will not be contrary to the public interest in terms of navigation impediment.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the State of Florida, Department of Environmental Regulation grant the application of Debra Flynn for a dock construction permit in accordance with the conditions delineated above. DONE and ENTERED this 9th day of April, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of April, 1985. COPIES FURNISHED: Douglas H. MacLaughlin, Esq. James L. Torres, Legal Intern Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 James Hendricks, Esq. 317 Whitehead Street Key West, Florida 33040 Joel L. Beardsley Route 2, Box 441 Summerland Key, Florida 33042 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (5) 120.57253.77403.087403.412403.905
# 5
MARTIN COUNTY AND ST. LUCIE COUNTY vs ALL ABOARD FLORIDA - OPERATIONS, LLC; FLORIDA EAST COAST RAILWAY, LLC; AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 16-005718 (2016)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 30, 2016 Number: 16-005718 Latest Update: Nov. 16, 2017

The Issue The issues to be determined in these consolidated cases are whether All Aboard Florida – Operations, LLC (“the Applicant”), and Florida East Coast Railway, LLC (“FECR”), are entitled to an Environmental Resource Permit Modification authorizing the construction of a stormwater management system and related activities to serve railway facilities, and a verification of exemption for work to be done at 23 roadway crossings (collectively referred to as “the project”).

Findings Of Fact The Parties Petitioners Martin County and St. Lucie County are political subdivisions of the State of Florida. Petitioners have substantial interests that could be affected by the District’s proposed authorizations. Intervenor Town of St. Lucie Village is a political subdivision of the State of Florida. Intervenor has substantial interests that could be affected by the District’s proposed authorizations. The Applicant, All Aboard Florida – Operations, LLC, is a Delaware limited liability company based in Miami. All Aboard Florida is part of a group of corporate entities formed for the principal purpose of developing and operating express passenger train service in Florida. Co-applicant Florida East Coast Railway, LLC, is a Florida limited liability company based in Jacksonville. FECR owns the existing railway corridor the passenger train service will use between Miami and Cocoa. South Florida Water Management District is a regional agency granted powers and assigned duties under chapter 373, part IV, Florida Statutes, including powers and duties related to the regulation of construction activities in wetlands. The proposed activities are within the boundaries of the District. Background The objective of the All Aboard Florida Project is to establish express passenger train service connecting four large urban areas: Miami, Fort Lauderdale, West Palm Beach, and Orlando. Most of the passenger service route, including the portion which will pass through Martin County and St. Lucie County, will use an existing railroad right-of-way used since the late 1800s. The FECR rail corridor runs along Florida’s east coast from Miami to Jacksonville. It supported passenger and freight operations on shared double mainline tracks from 1895 to 1968. The passenger service was terminated in 1968 and portions of the double track and certain bridge structures were removed. The freight service continued and remains in operation today. The passenger service will use the FECR right-of-way from Miami to Cocoa and then turn west on a new segment to be constructed from Cocoa to Orlando. The railway corridor will be operated as a joint facility, with passenger and freight trains sharing the double mainline tracks. The Applicant is upgrading the portion of the corridor between Miami and Cocoa by, among other things, replacing existing railroad ties and tracks, reinstalling double mainline tracks, and improving grade crossings. The Applicant is also installing Positive Train Control systems which provide integrated command and control of passenger and freight train movements and allow the trains to be directed and stopped remotely or automatically in the event of operator error or disability, or an obstruction on the track. The All Aboard Florida Project is being developed in two phases, Phase I extends from Miami to West Palm Beach, and Phase II from West Palm Beach to Orlando. This proceeding involves a segment within Phase II, known as Segment D09, which runs from just north of West Palm Beach to the northern boundary of St. Lucie County. The railway corridor in Segment D09 passes through Jonathan Dickinson State Park in Martin County and the Savannas Preserve State Park, parts of which are in both Martin County and St. Lucie County. Surface waters within these state parks are Outstanding Florida Waters (“OFWs”). The railway in Segment D09 also passes over the St. Lucie River using a bridge that can be opened to allow boats to pass. The Applicant plans to run 16 round trips per day between Miami and Orlando, which is about one train an hour in each direction, starting early in the morning and continuing to mid-evening. In 2013, the District issued the Applicant an exemption under section 373.406(6), which exempts activities having only minimal or insignificant adverse impacts on water resources. The 2013 exemption covers proposed work in approximately 48 of the 65 miles which make up Segment D09, and includes replacement of existing tracks and re-establishment of a second set of mainline tracks where they were historically located. The 2013 exemption covers all but 24 of the roadway crossings within Segment D09 where work is to be done in connection with the All Aboard Florida Project. In 2015, the District issued the Applicant a general permit under rule 62-330.401, which authorizes activities that are expected to cause minimal adverse impacts to water resources, for the installation of fiber optic cable along the rail bed within Segment D09. The 2013 exemption and 2015 general permit were not challenged and became final agency action. The Proposed Agency Actions The ERP Modification covers work to be done in approximately 17 of the 65 miles which make up Segment D09. The work will consist primarily of replacing existing tracks, installing new tracks, making curve modifications in some locations to accommodate faster trains, culvert modifications, and work on some fixed bridge crossings over non-navigable waters. The 2017 Exemption at issue in this proceeding covers improvements to 23 of the 24 roadway crossings that were not covered by the 2013 exemption. Proposed improvements at Southeast Florida Street in Stuart will be permitted separately. The improvements covered by the 2017 Exemption include upgrading existing safety gates and signals; installing curbs, guardrails, and sidewalks; resurfacing some existing paved surfaces; and adding some new paving. Petitioners argue that, because the District’s staff report for the ERP Modification states that the ERP does not cover work at roadway crossings, track work at roadway crossings has not been authorized. However, the staff report was referring to the roadway improvements that are described in the 2017 Exemption. The proposed track work at the roadway crossings was described in the ERP application and was reviewed and authorized by the District in the ERP Modification. “Segmentation” Petitioners claim it was improper for the District to separately review and authorize the proposed activities covered by the 2013 exemption, the 2015 general permit, the ERP Modification, and the 2017 Exemption. Petitioners contend that, as a consequence of this “segmentation” of the project, the District approved “roads to nowhere,” by which Petitioners mean that these activities do not have independent functionality. Petitioners’ argument is based on section 1.5.2 of the Applicant’s Handbook, Volume 1,1/ which states that applications to construct phases of a project can only be considered when each phase can be constructed, operated, and maintained totally independent of future phases. However, the activities authorized by the four agency actions are not phases of a project. They are all parts of Phase II of the All Aboard Florida Project, which is the passenger railway from West Palm Beach to Orlando. Section 1.5.2 is not interpreted or applied by the District as a prohibition against separate review and approval of related activities when they qualify under the District’s rules for exemptions, general permits, and ERPs. Much of Phase II is outside the District’s geographic boundaries and, therefore, beyond its regulatory jurisdiction. The District can only review and regulate a portion of Phase II. The District is unable to review this portion as a stand-alone railway project that can function independently from other project parts. The Proposed Stormwater Management System Where the Applicant is replacing existing tracks or re- establishing a second set of tracks, it will be laying new ties, ballast, and rail on previously-compacted earth. In those areas, no stormwater management modifications were required by the District. The Applicant’s new proposed stormwater management system will be located in a five-mile area of the corridor where an existing siding will be shifted outward and used as a third track. In this area, swales with hardened weir discharge structures and skimmers will be installed to provide stormwater treatment beyond what currently exists. The weir discharge structures will serve to prevent erosion at discharge points. The skimmers will serve to capture any floating oils or refuse. Because the FECR right-of-way is not wide enough in some three-track areas to also accommodate swales, the proposed stormwater management system was oversized in other locations to provide compensating volume. The District determined that this solution was an accepted engineering practice for linear systems such as railroads. Petitioners argue that the Applicant’s proposed stormwater management system is deficient because some of the proposed swales do not meet the definition of “swale” in section 403.803(14) as having side slopes equal to or greater than three feet horizontal to one foot vertical (3:1). The statute first defines a swale to include a manmade trench which has “a top width-to-depth ratio of the cross-section equal to or greater than 6:1.” The swales used in the proposed stormwater management system meet this description. Petitioners showed that the plans for one of the 46 proposed swales included some construction outside the FECR right-of-way. In response, the Applicant submitted revised plan sheets to remove the swale at issue. The Emergency Access Way The ERP application includes proposed modifications to portions of an existing unpaved emergency access way which runs along the tracks in some areas. The access way is a private dirt road for railroad-related vehicles and is sometimes used for maintenance activities. At the final hearing, Petitioners identified an inconsistency between an application document which summarizes the extent of proposed new access way construction and the individual plan sheets that depict the construction. The Applicant resolved the inconsistency by correcting the construction summary document. Petitioners also identified an individual plan sheet showing proposed access way modifications to occur outside of the FECR right-of-way. This second issue was resolved by eliminating any proposed work outside the right-of-way. Petitioners believe the proposed work on the access way was not fully described and reviewed because Petitioners believe the access way will be made continuous. However, the access way is not continuous currently and the Applicant is not proposing to make it continuous. No District rule requires the access way segments to be connected as a condition for approval of the ERP. Water Quantity Impacts An applicant for an ERP must provide reasonable assurance that the construction, operation, and maintenance of a proposed project will not cause adverse water quantity impacts to receiving waters and adjacent lands, adverse flooding to on-site or off-site property, or adverse impacts to existing surface water storage and conveyance capabilities. The District’s design criterion to meet this requirement for water quantity management is a demonstration that the proposed stormwater system will capture the additional runoff caused during a 25-year/3-day storm event. The Applicant’s proposed stormwater system meets or exceeds this requirement. Petitioners argue that the Applicant failed to provide reasonable assurance because the ERP application materials did not include a calculation of the discharge rates and velocities for water discharging from the swales during the design storm. The ERP application contains the information required to calculate the discharge rates and velocities and the Applicant’s stormwater expert, Bruce McArthur, performed the calculations and testified at the final hearing that in the areas where there will be discharges, the discharge rates and velocities would be “minor” and would not cause adverse impacts. The District’s stormwater expert, Jesse Markle, shared this opinion. Petitioners argue that this information should have been provided to the District in the permit application, but this is a de novo proceeding where new evidence to establish reasonable assurances can be presented. Petitioners did not show that Mr. McArthur is wrong. Petitioners failed to prove that the proposed project will cause adverse water quantity impacts, flooding, or adverse impacts to surface water storage and conveyance capabilities. Water Quality Impacts To obtain an ERP, an applicant must provide reasonable assurance that the construction, operation, and maintenance of a regulated project will not adversely affect the quality of receiving waters, such that state water quality standards would be violated. The District’s design criteria for water quality required the Applicant to show that its proposed stormwater system will capture at least 0.5 inches of runoff over the developed area. To be conservative, the Applicant designed its proposed system to capture 1.0 inch of runoff in most areas. Under District rules, if a stormwater system will directly discharge to impaired waters or OFWs, an additional 50 percent of water quality treatment volume is required. The proposed stormwater system will not directly discharge to either impaired waters or OFWs. In some locations, there is the potential for stormwater discharged from the proposed stormwater system to reach OFWs by overland flow, after the stormwater has been treated for water quality purposes. The Applicant designed its proposed stormwater system to provide at least an additional 50 percent of water quality treatment volume in areas where this potential exists. To ensure that the proposed construction activities do not degrade adjacent wetlands, other surface waters, or off-site areas due to erosion and sedimentation, the Applicant prepared an Erosion and Sediment Control Plan. Temporary silt fences and turbidity barriers will be installed and maintained around the limits of the construction. The District’s design criteria for water quality do not require an analysis of individual contaminants that can be contained in stormwater, except in circumstances that do not apply to this project. Compliance with the design criteria creates a presumption that water quality standards for all potential contaminants are met. See Applicant’s Handbook, V. II, § 4.1.1. Although not required, the Applicant provided a loading analysis for the proposed swales which could potentially discharge overland to impaired waters or OFWs. The analysis compared pre- and post-development conditions and showed there would be a net reduction in pollutant loading. Petitioners believe the pollutant loading analysis was inadequate because it did not specifically test for arsenic and petroleum hydrocarbons. However, the analysis was not required and adequate treatment is presumed. Petitioners did not conduct their own analysis to show that water quality standards would be violated. Petitioners’ expert, Patrick Dayan, believes the compaction of previously undisturbed soils in the emergency access way would increase stormwater runoff. However, he did not calculate the difference between pre- and post-construction infiltration rates at any particular location. His opinion on this point was not persuasive. Petitioners failed to prove that the proposed project will generate stormwater that will adversely affect the quality of receiving waters such that state water quality standards would be violated. The preponderance of the evidence shows the project complies with District design criteria and will not cause water quality violations. Soil and Sediment Contamination Petitioners argue that the ERP Modification does not account for the disturbance of existing contaminants in soils and sediments that could be carried outside of the right-of-way and into OFWs. Petitioners’ argument is based on investigations by their geologist, Janet Peterson, who collected soil, sediment, and surface water samples at 13 sites along the FECR rail corridor in the vicinity of OFWs, or surface waters that eventually flow into OFWs. During her sampling visits, Ms. Peterson saw no visual evidence of an oil spill, fluid leak, or other release of hazardous materials. Ms. Peterson compared her soil sample results to the Residential Direct Exposure Soil Cleanup Target Levels (“SCTLs”) established in rule 62-777. The SCTLs are the levels at which toxicity becomes a human health concern and the residential SCTLs assume soil ingestion of 200 mg/day for children, and 100 mg/day for adults, 350 days a year, for 30 years. Some of the soil sampling results showed exceedances of SCTLs, but the SCTLs are not applicable here because none of the sample sites are locations where children or adults would be expected to ingest soil at such levels for such lengths of time. Petitioners did not show that the contaminants are likely to migrate to locations where such exposure would occur. Ms. Peterson compared her soil sample results to the Marine Surface Water Leachability SCTLs, but she did not develop site-specific leachability-based SCTLs using DEP’s approved methodology. Nor did she show that the proposed project will cause the soils to leach the contaminants. Ms. Peterson collected sediment samples from shorelines, but not where construction activities are proposed. She compared her sediment sample results to the Florida Department of Environmental Protection’s (“DEP”) Sediment Quality Assessment Guidelines (“SQAGs”). These guidelines are not water quality standards. Any exceedance of these guidelines requires further analysis to determine potential water quality impacts. Ms. Peterson did not conduct the analysis. Ms. Peterson acknowledged that there are numerous sources for these pollutants at or near her sample sites, such as high-traffic roads, vehicular bridges, commercial and industrial facilities, boatyards, and golf courses. She did not establish baselines or controls. Ms. Peterson collected surface water samples at seven sites, some of which were located outside the FECR right-of-way. The results showed levels of phosphorous and nitrogen above the criteria for nutrients at some locations. Phosphorous, nitrogen, and the other nutrients are prevalent in the waters of Martin County and St. Lucie County and come from many sources. Petitioners’ evidence focused on existing conditions and not expected impacts of the proposed project. The evidence was insufficient to prove the proposed project will cause or contribute to water quality violations. Functions Provided by Wetlands and Other Surface Waters An applicant for an ERP must provide reasonable assurance that a proposed project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Petitioners claim the Applicant and District should not have relied on Florida Land Use Cover and Forms Classification System (“FLUCCS”) maps to identify and characterize wetlands and other habitat areas because the maps are too general and inaccurate. However, the FLUCCS maps were not used by the Applicant or District to evaluate impacts to wetlands or other habitats. The Applicant began its evaluation of impacts to wetlands and other habitat areas by field-flagging and surveying the wetland and surface water boundaries in the project area using a GPS device with sub-meter accuracy. It then digitized the GPS delineations and overlaid them with the limits of construction to evaluate anticipated direct impacts to wetlands and other surface waters. The District then verified the delineations and assessments in the field. The Applicant and District determined that there are a total of 4.71 acres of wetlands within the FECR right-of-way, including tidal mangroves, freshwater marsh, and wet prairie. They also determined the proposed project will directly impact 0.35 acres of wetlands, consisting of 0.09 acres of freshwater marsh and 0.26 acres of mangroves. Petitioners contend that the Applicant failed to account for all of the project’s wetland impacts, based on the wetland delineations made by their wetland expert, Andrew Woodruff. Most of the impacts that Mr. Woodruff believes were not accounted for are small, between 0.01 and 0.05 acres. The largest one is acres. The Applicant’s delineations are more reliable than Mr. Woodruff’s because the methodology employed by the Applicant had greater precision. It is more likely to be accurate. Petitioners argue that the 2013 exemption and the 2015 general permit did not authorize work in wetlands and, therefore, the impacts they cause must be evaluated in this ERP Modification. However, Petitioners did not prove that there are unaccounted-for wetland impacts associated with those authorizations. Any impacts associated with best management practices for erosion control, such as the installation of silt fences, would be temporary. The District does not include such temporary minor impacts in its direct, secondary, or cumulative impacts analyses. Most of the wetlands that would be directly impacted by the ERP Modification are degraded due to past hydrologic alterations and soil disturbances from the original construction and historical use of the FECR railway corridor, and infestation by exotic plant species. Most of these wetlands are also adjacent to disturbed uplands within or near the rail corridor. The functional values of most of the wetlands that would be affected have been reduced by these disturbances. The Applicant provided reasonable assurance that the project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Secondary Impacts Section 10.2.7 of the Applicant’s Handbook requires an applicant to provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonably expected uses of a proposed activity (a) will not cause or contribute to violations of water quality standards or adverse impacts to the functions of wetlands or other surface waters; (b) will not adversely impact the ecological value of uplands for bald eagles, and aquatic or wetland-dependent listed animal species for nesting or denning by these species; (c) will not cause impacts to significant historical or archaeological resources; and (d) additional phases for which plans have been submitted, and closely linked projects regulated under chapter 373, part IV, will not cause water quality violations or adverse impacts to the functions of wetlands or other surface waters. The proposed work will be entirely within the limits of the existing railway corridor where secondary impacts to wetlands and other surface waters caused by noise, vibration, fragmentation of habitats, and barriers to wildlife have existed for decades. The preponderance of the evidence shows that any increase in these kinds of impacts would be insignificant and would not reduce the current functions being provided. Because the affected wetlands are not preferred habitat for wetland-dependent, endangered, or threatened wildlife species, or species of special concern, and no such species were observed in the area, no adverse impacts to these species are expected to occur. Petitioners contend that adverse impacts will occur to the gopher tortoise, scrub jay, and prickly apple cactus. These are not aquatic or wetland-dependent species. However, the preponderance of the evidence shows any increase in impacts to these species would be insignificant. When the train bridges are closed, boats with masts or other components that make them too tall to pass under the train bridges must wait for the bridge to open before continuing. Petitioners contend that the current “stacking” of boats waiting for the bridges to open would worsen and would adversely impact seagrass beds and the West Indian Manatee. However, it was not shown that seagrass beds are in the areas where the boats are stacking. The available manatee mortality data does not show a link between boat stacking and boat collisions with manatees. Mr. Woodruff’s opinion about increased injuries to manatees caused by increased boat stacking was speculative and unpersuasive. The preponderance of the evidence shows that the adverse effects on both listed and non-listed wildlife species, caused by faster and more numerous trains would be insignificant. The activities associated with the 2013 exemption and the 2015 general permit for fiber optic cable were based on determinations that the activities would have minimal or insignificant adverse impacts on water resources. These determinations are not subject to challenge in this proceeding. The Applicant provided reasonable assurance that the secondary impacts of the project will not cause or contribute to violations of water quality standards, adversely impact the functions of wetlands or other surface waters, adversely impact the ecological value of uplands for use by listed animal species, or cause impacts to significant historical or archaeological resources. Elimination and Reduction of Impacts Under section 10.2.1.1 of the Applicant’s Handbook, if a proposed activity will result in adverse impacts to wetlands and other surface waters, the applicant for an ERP must implement practicable design modifications to eliminate or reduce the impacts, subject to certain exceptions that will be discussed below. Petitioners argue that this rule requires the Applicant and District to evaluate the practicability of alternative routes through the region, routes other than the existing railway corridor in Segment D09. As explained in the Conclusions of Law, that argument is rejected. The evaluation of project modifications to avoid impacts was appropriately confined to the railway corridor in Segment D09. The Applicant implemented practicable design modifications in the project area to reduce or eliminate impacts to wetlands and other surface waters. Those modifications included the shifting of track alignments, the elimination of certain third-track segments, and the elimination of some proposed access way modifications. However, the project qualified under both “opt out” criteria in section 10.2.1.2 of the Applicant’s Handbook so that design modifications to reduce or eliminate impacts were not required: (1) The ecological value of the functions provided by the area of wetland or surface water to be adversely affected is low, and the proposed mitigation will provide greater long-term ecological value; and (2) the applicant proposes mitigation that implements all or part of a plan that provides regional ecological value and provides greater long-term ecological value. Mitigation The Applicant proposes to mitigate for impacts to wetlands by purchasing mitigation credits from four District- approved mitigation banks: the Bluefield Ranch, Bear Point, Loxahatchee, and F.P.L. Everglades Mitigation Banks. Each is a regional off-site mitigation area which implements a detailed management plan and provides regional long-term ecological value. The number of mitigation credits needed to offset loss of function from impacts to wetlands was calculated using the Modified Wetland Rapid Assessment Procedure (“MWRAP”) or Wetland Assessment Technique for Environmental Review (“WATER”), as prescribed in the state permit for each mitigation bank. Applying these methods, the Applicant is required to purchase mitigation credits. The Applicant proposed to mitigate the adverse impacts to freshwater marsh wetlands by purchasing 0.01 freshwater herbaceous credits from the Bluefield Ranch Mitigation Bank, and 0.06 freshwater herbaceous credits from the Loxahatchee Mitigation Bank. The adverse impacts to tidal mangrove wetlands would be mitigated by purchasing 0.12 saltwater credits from the Bear Point Mitigation Bank, and 0.02 saltwater credits from the F.P.L. Everglades Mitigation Bank. The Applicant committed to purchase an additional 0.29 freshwater herbaceous credits from the Bluefield Ranch Mitigation Bank, for a total of 0.50 mitigation credits. The proposed mitigation implements a plan that will provide greater long-term ecological value than is provided by the wetlands that will be impacted. The Applicant proved by a preponderance of the evidence that the project complies with the District’s mitigation requirements. Cumulative Impacts To obtain an ERP, an applicant must provide reasonable assurance that a regulated activity will not result in unacceptable cumulative impacts to water resources. This assurance can be provided by proposing to fully mitigate the impacts within the same basin. However, when an applicant proposes mitigation in another drainage basin, the applicant must demonstrate that the regulated activity will not cause unacceptable cumulative impacts. The proposed project will adversely impact 0.02 acres of freshwater marsh wetlands and 0.21 acres of tidal mangrove wetlands in the St. Lucie River basin. The impacts to the freshwater marshes must be mitigated out-of-basin because there are no mitigation banks in the basin which offer freshwater herbaceous mitigation credits. The proposed project will adversely impact 0.07 acres of the freshwater marshes and 0.05 acres of the mangrove wetlands in the Loxahatchee River basin. Those impacts must also be mitigated out-of-basin because there are no mitigation banks in the Loxahatchee River basin. Because some of the Applicant’s proposed mitigation must be provided out-of-basin, the ERP application included a cumulative impact analysis. The analysis evaluated whether the proposed project, when considered in conjunction with other possible development within the St. Lucie River and Loxahatchee River drainage basins, would result in unacceptable cumulative impacts considering each basin as a whole. There are approximately 10,068 acres of freshwater marshes within the St. Lucie basin, of which an estimated 4,929 acres are not preserved and would be at risk of potential future development. The proposed project will adversely impact 0.02 of those acres, which is only 0.0004 percent of the total at-risk acreage. There are about 34,000 acres of freshwater marshes within the Loxahatchee River basin, of which an estimated 7,463 acres are at risk of future development, and approximately 564 acres of tidal mangrove wetlands, of which an estimated 75 acres are at risk of future development. The project will adversely impact 0.07 acres of the freshwater marshes (0.0009 percent), and 0.05 acres of the tidal mangrove wetlands (0.0667 percent). Petitioners contend the Applicant’s analysis did not account for impacts from proposed activities authorized in the 2013 and 2015 general permit. However, Petitioners failed to prove there are unaccounted-for wetland impacts. The preponderance of the evidence supports the District’s determination that the proposed project will not cause unacceptable cumulative impacts to wetlands and other surface waters. Public Interest When an applicant seeks authorization for a regulated activity in, on, or over wetlands or surface waters, it must provide reasonable assurance that the activity will not be contrary to the public interest, or if the activity is within or significantly degrades an OFW, is clearly in the public interest, as determined by balancing the following criteria set forth in section 373.414(1)(a): Whether the activities will adversely affect the public health, safety, or welfare or the property of others; Whether the activities will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activities will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activities will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activities will be of a temporary or permanent nature; Whether the activities will adversely affect or will enhance significant historical and archaeological resources; and The current condition and relative value of functions being performed by areas affected by the proposed activities. The proposed work is not within an OFW, but entirely within the FECR corridor. The potential for overland flow and indirect impacts to OFWs is addressed by additional treatment of the stormwater prior to discharge. The proposed project would not significantly degrade an OFW. Therefore, the applicable inquiry is whether the project is contrary to the public interest. Factor 1: Public Safety, Safety, and Welfare Petitioners contend that the proposed project will adversely affect public health, safety, and welfare by impacting water quantity, water quality, and certain non-environmental matters such as emergency response times, traffic congestion, and potential train collisions with pedestrians and vehicles. Potential environmental impacts have been addressed above and, by a preponderance of the evidence, the District and the Applicant showed that such impacts would be insignificant or would be mitigated. As to the potential for non-environmental impacts associated with train operations, it is explained in the Conclusions of Law that the public interest test does not include consideration of non-environmental factors other than those expressly articulated in the statute, such as navigation and preservation of historical or archaeological resources. However, because evidence of non-environmental impacts was admitted at the final hearing, the issues raised by Petitioners will be briefly addressed below. The regulatory agency with specific responsibility for railroad safety is the Federal Railroad Administration (“FRA”). The FRA reviewed the safety features associated with the proposed passenger train operations, and approved them. Public safety will be enhanced at roadway crossings because of the proposed improvements and the use of modern technology in monitoring and managing the movement of trains. Petitioners contend that the addition of the passenger rail service will impede emergency response times in Martin County and St. Lucie County due to more frequent roadway closures. However, freight trains currently impede emergency response times due to their length and slow speed. The passenger trains will be much shorter in length and faster so that roadway crossing closures for passing passenger trains will be much shorter than for freight trains. The ERP Modification and 2017 Exemption do not affect freight train operations. The preponderance of the evidence shows that passenger rail service is unlikely to cause a material increase in the occurrence of circumstances where an emergency responder is impeded by a train. The current problem must be addressed through changes in freight train operations. Petitioners also contend that the passenger rail service will interfere with hurricane evacuation. The persuasive evidence does not support that contention. Train service would cease when a hurricane is approaching. Petitioners contend the trains will have to be “staged” on either side of the two moveable bridges while other trains cross, thereby blocking road intersections. However, this was a matter of speculation. The Applicant does not propose or want to stage trains at the bridges. Petitioners contend that the project will cause hazards to boaters on the St. Lucie River because there will be more times when the train bridge will be closed to allow the passage of passenger trains. Although there were many statistics presented about the number of boats affected, the evidence was largely anecdotal with respect to the current hazard associated with boaters waiting for the passage of freight trains and speculative as to the expected increase in the hazard if shorter and faster passenger trains are added. Factor 2: Conservation of Fish and Wildlife As previously found, the proposed activities will not adversely affect the conservation of fish and wildlife, including threatened or endangered species. The preponderance of the evidence shows the project will have only insignificant adverse impacts on water resources and wildlife. Factor 3: Navigation of the Flow of Water Petitioners claim the project will hinder navigation on the St. Lucie and Loxahatchee Rivers because of the increase in bridge closures if passenger trains are added. The U.S. Coast Guard is the agency with clear authority to regulate the opening and closing of moveable train bridges over navigable waters in the interests of navigation. Petitioners’ insistence that the District address the bridge openings is novel. No instance was identified by the parties where this District, any other water management district, or DEP has attempted through an ERP to dictate how frequently a railroad bridge must open to accommodate boat traffic. The Coast Guard is currently reviewing the project’s potential impacts on navigation and will make a determination about the operation of the moveable bridges. It has already made such a determination for the moveable bridge which crosses the New River in Ft. Lauderdale. Petitioners point to section 10.2.3.3 of the Applicant’s Handbook, which states that the District can consider an applicant’s Coast Guard permit, and suggest that this shows the District is not limited to what the Coast Guard has required. However, Section 10.2.3.3 explains the navigation criterion in terms of preventing encroachments into channels and improving channel markings, neither of which encompasses the regulation of train bridges. The preponderance of the evidence shows the project would not cause harmful erosion or shoaling or adversely affect the flow of water. Factor 4: Fishing, Recreational Values, and Marine Productivity The preponderance of the evidence shows that there would be no adverse impacts or only insignificant impacts to fishing or recreational values and marine productivity. Factor 5: Permanent Impact The proposed project will have both temporary and permanent impacts. The temporary impacts include the installation of silt fences and turbidity barriers designed to reduce water quality impacts and impacts to functions provided by wetlands and surface waters. The impacts due to track installation, construction and rehabilitation of the non-moveable bridges, at-grade crossing improvements, and stormwater system improvements are permanent in nature. The permanent impacts have been minimized and mitigated. Factor 6: Historical or Archaeological Resources Petitioners do not contend that the project will adversely affect significant historical or archaeological resources. Factor 7: Wetland Functions in Areas Affected Because the proposed work is within the limits of an existing railway corridor where impacts have been occurring for decades, and the majority of the wetlands to be affected are of a low to moderate quality, there would be only a small loss of functional values and that loss would be fully mitigated. Public Interest Summary When the seven public interest factors are considered and balanced, the proposed project is not contrary to the public interest. Even if Petitioners’ non-environmental issues are included, the project is not contrary to the public interest. Compliance With Other Permit Conditions The project is capable, based on accepted engineering and scientific principles, of performing and functioning as proposed. The Applicant demonstrated sufficient real property interests over the lands upon which project activities will be conducted. It obtained the required consent for proposed activities relating to bridge crossings over state-owned submerged lands. The Applicant provided reasonable assurance of compliance with all other applicable permit criteria. Exemption Verification for Roadway Crossings The Applicant’s ERP application included a mixture of activities which required an individual permit, as well as activities in roadway crossings which the Applicant claimed were exempt from permitting. Pursuant to section 5.5.3.4 of the Applicant’s Handbook, the Applicant requested a verification of exemption as to certain work to be done within 23 of those 24 roadway crossings. The District determined that the improvements for which an exemption was sought were exempt from permitting under rule 62-330.051(4)(c) for minor roadway safety construction, rule 62-330.051(4)(d) resurfacing of paved roads, and rule 62-330.051(10) for “construction, alteration, maintenance, removal or abandonment of recreational paths for pedestrians, bicycles, and golf carts.” The preponderance of the evidence shows the proposed work qualifies for exemption under these rules.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order that: approves Environmental Resource Permit Modification No. 13-05321-P on the terms and conditions set forth in the District’s Corrected Proposed Amended Staff Report of May 11, 2017; and approves the Verification of Exemption dated March 31, 2017. DONE AND ENTERED this 29th day of September, 2017, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 2017.

Florida Laws (14) 120.52120.569120.57120.573120.60163.3161373.016373.069373.119373.406373.414373.427403.161403.803
# 7
L. BERDEAL vs. JAMES L. CARPENTER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-000659 (1988)
Division of Administrative Hearings, Florida Number: 88-000659 Latest Update: Aug. 29, 1988

Findings Of Fact Respondent/applicant, James L. Carpenter (applicant or Carpenter), is the owner of upland property bordering on and contiguous to a man-made lagoon in Vaca Key near Marathon, Florida. The property is also adjacent to an artificial man-made canal which connects the lagoon to the open waters of Florida Bay. The lagoon and canal are classified as Class III waters of the State while Florida Bay is a Class III Outstanding Florida Water. A more precise location of the property is Section 9, Township 66 South, Range 32 East, Monroe County, Florida. By application dated June 23, 1987 applicant sought the issuance of a dredge and fill permit from respondent, Department of Environmental Regulation (DER), authorizing the construction of an "L" shaped 125'x8' commercial dock with a 10'x8' access walkway waterward of mean high water (MHW) in the canal. The dock and walkway will be located on the property described in finding of fact 1. According to the application, Carpenter owns several "landlocked residences" in the vicinity of the proposed dock and desires to provide dockage for residents who rent his houses. Because of DER concerns that shading might affect photosynthetic capabilities in the vicinity of the project, applicant agreed to revise his application. This revision was made on December 21, 1987 and reduced the dock size to 102'x6' while the access walkway was increased slightly to 12'x8'. Thus, the dock will extend eight feet into the canal beyond the MHW. On January 5, 1988 DER's district office issued an Intent to Issue a permit subject to seven specific conditions incorporated in the permit. This prompted the filing of a petition by petitioner, Lillian Berdeal (Berdeal), who owns upland property bordering on and contiguous to the lagoon, canal and Florida Bay. She operates a commercial seafood business directly across the canal from Carpenter. According to her petition, Berdeal asserts that Carpenter's dock would adversely affect navigation in the canal and the health, safety and welfare or the property of others. The water body in question is a man-made canal facing to the north and providing an outlet for the lagoon to Florida Bay. The lagoon, which measures approximately 150'x100', is fairly well developed. On the east and southeast side of the lagoon lie an outdoor restaurant and Carpenter's boat rental business. Petitioner's seafood processing operation lies on the west and southwest sides of the lagoon and lagoon entrance. Photographs of the area have been received in evidence as DER exhibits 1 and 2 and petitioner's exhibit 1. Presently, there are five finger piers (docks) in front of Berdeal's property at the narrowest point of the canal. These piers are directly across the canal from Carpenter's proposed dock addition. They extend out eight feet perpendicular to the shoreline and are now used by commercial fishermen for docking purposes while using Berdeal's facility. Approximately thirty or forty boats use the finger piers during fishing season (August - May) while up to twenty may use them in the off-season (June - July). Berdeal described those boats as ranging from thirty to forty-five feet in length and having beams up to, but not exceeding, sixteen feet. However, vessels at petitioner's facility on the day of DER's inspection had an average beam of ten feet. The evidence is conflicting as to the canal's width at its most narrow point. According to DER's expert, the minimum width is seventy-six feet, and this figure is accepted as being more credible than Berdeal's own measurement of sixty-three feet. If the project is constructed, Carpenter's dock, together with a boat having a ten foot beam, would use around eighteen feet of the channel at its most narrow width while Berdeal's facility, if used by the largest boat, would take up another twenty-three feet. This would still leave around thirty-five feet of channel for navigation purposes between the two docks at the canal's most narrow point. According to applicant's expert in navigation, James J. Morrison, who has piloted boats in the area for over thirty years, a boat may safely operate in the canal if it has five feet of water on each side. This margin of safety is sufficient in all weather conditions up to and including a small craft warning. If the project is approved, the necessary margin of safety would be available. It is noted also that there are no significant currents in the canal that would adversely affect navigation, and under normal weather conditions, the canal and basin are easily navigable. Petitioner presented the testimony of a commercial fisherman, Leonard Quasney, who expressed concerns that northerly winds periodically drive aquatic weeds and grasses into the lagoon and canal thereby impairing the ability of a boat to safely operate. These weeds are shown in photographs received as petitioner's exhibit 1. It was Quasney's contention that, coupled with the periodic influx of weeds, the addition of a dock at the canal's most narrow point will make navigation more hazardous. However, this theory was discounted by expert witness Morrison who pointed out that, while it is true that floating mats of weeds affect the ability of a person to handle a boat by making the boat's rudder and propeller action less responsive, they do not affect the ability to navigate the canal. In other words, as long as the margin of safety is available in the canal, the presence of the weeds would not hinder a ship's ability to enter and exit the lagoon. This testimony is accepted as being more credible on the issue, and it is found that the new dock will not create a navigational hazard as a result of the weeds. Berdeal is concerned also that the new dock would make it more difficult for fishermen to access her property and therefore cause economic harm to both her and the fishermen. However, this contention was not substantiated. The parties have stipulated that, with the following special conditions proposed by DER at hearing regarding limitations on commercial use, liveaboards and scraping boat bottoms, all water quality standards will be met: All temporary and permanent use of liveaboard or liveaboard type vessels for residential use is prohibited. All on site fueling activities are prohibited. All major vessel repair, such as hull scraping and painting, with the boat in the water is prohibited. Only private use of the dock is permitted. All double parking or rafting of boats along the dock is prohibited. General conditions common to all dredge and fill permits. The parties have stipulated that the "public interest" criteria in Subsection 403.918(2)(a)2. and 4.-7., Florida Statutes (1987), have been satisfied. In addition, a registered engineer has certified that the dock's construction and use will not have an adverse effect on the public health, safety and welfare or the property of others. Petitioner has applied for the issuance of a permit allowing the construction of additional docks at her facility. If the application is approved, these docks will be used for commercial purposes. The proposed impact of this project, and its cumulative impact on the area, was considered by DER in its evaluation of Carpenter's application. However, conditions to be included in Berdeal's permit will minimize any water quality or navigation impacts of the project, even on a cumulative basis.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the application of James L. Carpenter for a dredge and fill permit be granted subject to those specific, special and general conditions imposed by the agency. DONE and ORDERED this 29th day of August, 1988, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 FILED with the Clerk of the Division of Administrative Hearings this 29th day of August, 1988.

Florida Laws (1) 120.57
# 8
MELLITA A. LANE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND INTERNATIONAL PAPER COMPANY, 05-001609 (2005)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida May 04, 2005 Number: 05-001609 Latest Update: Aug. 09, 2007

The Issue The issues in this case are whether IP is entitled to issuance of National Pollutant Discharge Elimination System (NPDES) Permit Number FL0002526-001/001-IW1S ("the proposed permit"), Consent Order No. 04-1202, Authorization for Experimental Use of Wetlands Order No. 04-1442, and Waiver Order No. 04-0730 (collectively, "the Department authorizations"), which would authorize IP to discharge treated industrial wastewater from its paper mill in Cantonment, Escambia County, Florida, into wetlands which flow to Elevenmile Creek and Perdido Bay.

Findings Of Fact Introduction A. The Parties The Department is the state agency authorized under Chapter 403, Florida Statutes (2006),2 to regulate discharges of industrial wastewater to waters of the state. Under a delegation from the United States Environmental Protection Agency (EPA), the Department administers the NPDES permitting program in Florida. IP owns and operates the integrated bleached kraft paper mill in Cantonment, Escambia County, Florida. FOPB is a non-profit Alabama corporation3 established in 1988 whose members are interested in protecting the water quality and natural resources of Perdido Bay. FOPB has approximately 450 members. About 90 percent of the members own property adjacent to Perdido Bay. James Lane is the President of FOPB. Mellita A. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane are the adult children of Dr. Jacqueline Lane and James Lane. Dr. Lane and James Lane live on property adjacent to Perdido Bay with their son Peter. The Adjacent Waters The mill's wastewater effluent is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class III water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama on the west. The dividing line between the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 90 crosses the Bay, going east and west, and forms the boundary between what is often referred to as the "Upper Bay" and "Lower Bay." The Bay is relatively shallow, especially in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay is designated as a Class III water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. It is primarily a freshwater river but it is sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (OFW) in 1979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, is a large tract of land owned by IP called the Rainwater Tract. The northern part of the tract is primarily freshwater wetlands. The southern part is a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. The Mill 1. Production Florida Pulp and Paper Company first began operating the Cantonment paper mill in 1941. St. Regis Paper Company (St. Regis) acquired the mill in 1946. In 1984, Champion International Corporation (Champion) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such as printing and writing grades of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to be printing and writing paper. The mill is integrated, meaning that it brings in logs and wood chips, makes pulp, and produces paper. The wood is chemically treated in cookers called digesters to separate the cellulose from the lignin in the wood because only the cellulose is used to make paper. Then the "brown stock" from the digesters goes through the oxygen delignification process, is mixed with water, and is pumped to paper machines that make the paper products. There are two paper machines located at the mill. The larger paper machine, designated P5, produces approximately 1,000 tons per day of writing and printing paper. The smaller machine, P4, produces approximately 400 to 500 tons per day of "fluff pulp." 2. The Existing Wastewater Treatment Plant The existing wastewater treatment plant (WWTP) at the mill is described in the revised NPDES permit as a "multi-pond primary and secondary treatment system, consisting of a primary treatment system (primary settling basin, polymer addition, two solids/sludge dewatering basins, and a floating dredge), and secondary treatment system (four ponds in series; two aerated stabilization basins with approximately 2,200 horsepower (HP) of aeration capacity, a nutrient feed system, two non-aerated polishing ponds and a final riffle section to re-aerate the effluent)." The WWTP is a system for reducing the biological oxygen demand (BOD) of the mill's wastewater by bacteria. IP’s wastewater is nutrient deficient when it enters the WWTP. Nutrients in the form of phosphorus and nitrogen must be added for the growth of bacteria. The WWTP begins with a primary settling basin in which suspended solids settle to the bottom. The solids form a sludge that is pumped by hydraulic dredge into two dewatering basins. The dewatering basins are used alternately so that, as one pond is filled, water is removed from the other pond. After being dewatered, the sludge is removed and allowed to dry. Then, it is transported to a landfill located about five miles west of the mill on land owned by IP. The water removed from the dewatering basins moves into to the first aeration basin. The aeration basin has floating aerator devices that add oxygen to facilitate biological conversion of the wastewater. The wastewater then flows sequentially through three more basins where there is further oxygenation and settling of the biological solids. The discharge from the fourth settling basin flows through a riffle section where the effluent is aerated using a series of waterfalls. This is the last element of the treatment process from which the mill's effluent enters waters of the state. Chemicals are added during the treatment process to control phosphorus and color. Chemicals are also added to suppress foam. Sanitary wastewater from the mill, after pretreatment in an activated sludge treatment system, is "sewered" to the mill's WWTP and further treated in the same manner as the industrial wastewater. A separate detention pond collects and treats stormwater from onsite and offsite areas and discharges at the same point as the wastewater effluent from the WWTP. Stormwater that falls on the industrial area of the mill is processed through the WWTP. The discharge point from the WWTP, and the point at which the effluent is monitored for compliance with state effluent limitations, is designated D-001, but is also called the Parshall Flume. The effluent is discharged from the Parshall Flume through a pipe to an area of natural wetlands. After passing through the wetlands, the combined flow runs through a pipe that enters Elevenmile Creek from below the surface. This area is called the "boil" because the water can be observed to boil to the surface of Elevenmile Creek. From the boil, the mill effluent flows approximately 14 miles down (apparently misnamed) Elevenmile Creek to upper Perdido Bay. Regulatory History of the Mill Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (DER) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The EPA issued St. Regis an NPDES permit in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its WWTP in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production process. In 1987, Champion applied to DER for an operating permit for its modified WWTP and also petitioned for a variance from the Class III water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's subsequent proposal to issue the operating permit and variance was formally challenged.4 In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for a regular operating permit and requested a temporary operating permit (TOP), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 ("the 1989 Consent Order"). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violation of state water quality standards in Elevenmile Creek for dissolved oxygen (DO), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommended measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed by a series of related scientific studies, which will be referred to collectively in this Recommended Order as "the Livingston studies." The 1989 Consent Order had no expiration date, but it was tied to the TOP, which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The TOP established the following specific effluent discharge limitations for the mill: Monthly Average Maximum Biological Oxygen Demand (BOD) (Mar-Oct) 4,500 lbs/day 6,885 lbs/day (Nov-Feb) 5,100 lbs/day 6,885 lbs/day Total Suspended Solids (TSS) (Mar-Oct) 8,000 lbs/day 27,000 lbs/day (Nov-Feb) 11,600 lbs/day 27,000 lbs/day Iron 3.5 mg/l Specific Conductance 2,500 micromhos/cm Zinc .075 mg/l The limits stated above for iron, specific conductance, and zinc were derived from the variance granted to Champion. Champion was also granted variances from the water quality standards for biological integrity, un-ionized ammonia, and DO. The 1989 Consent Order, TOP, and variance were the subject of the Recommended Order and Final Order issued in Perdido Bay Environmental Association, Inc. v. Champion International Corporation, 89 ER FALR 153 (DER Nov. 14, 1989). Champion's deviation from the standards for iron, zinc, and specific conductance pursuant to the variance was determined to present no significant risk of adverse effect on the water quality and biota of Elevenmile Creek and Perdido Bay. The mill effluent's effect on transparency (reduced by color in the mill effluent) was considered a potentially significant problem. However, because it was found that there was no practicable means known or available to reduce the color, and there was insufficient information at that time to determine how Champion's discharge of color was affecting the biota, Champion was allowed to continue its discharge of color into Elevenmile Creek pending the results of the Livingston studies. In the administrative hearing, the petitioners argued that it was unreasonable to put off compliance for five years, but the hearing officer determined that five years was reasonable under the circumstances. One finding in the Recommended Order and a reason for recommending approval of the TOP and Consent Order was: After the studies referred to in the consent order, the Department will not allow Champion additional time to study problems further. Significant improvements will be required within the five year period and at the end of that period, the plant will be in compliance with all water quality standards or will be denied an operating permit, with related enforcement action. The requirement of the 1989 Consent Order that Champion be in compliance with all applicable standards by December 1994, was qualified with the words "unless otherwise agreed." In considering this wording, the hearing officer opined that any change in the compliance deadline "would require a new notice of proposed agency action and point of entry for parties who might wish to contest any modification in the operational requirements, or changes in terms of compliance with water quality standards." The mill was not in compliance with all water quality standards in December 1994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. Instead, the Department agreed through correspondence with Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal operating permits into a single permit identified as Wastewater Permit Number FL0002526-002-IWF/MT. In summary, the permit requirements currently applicable to the operation of the Cantonment paper mill are contained in the following documents: January 3, 1983, EPA NPDES Permit December 13, 1989, DER Temporary Operating Permit (TOP) December 13, 1989, DER Consent Order December 12, 1989, DER Variance November 15, 1995, DEP Order (combining the NPDES permit and the State-issued wastewater permit) April 22, 1996, DEP Letter (clarifying November 15, 1995, Order regarding 1983 NPDES Permit) During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmile Creek or the Escambia River. In 2001, IP and Champion merged and IP applied to the Department to have the mill permit and related authorizations transferred to IP. Dr. Lane formally challenged the proposed transfer, but she was determined to lack standing. One conclusion of law in the Recommended Order issued in the 2001 administrative case was that the mill was in compliance with the consent order, TOP, and variance. That conclusion was not based on a finding that Champion was in compliance with all applicable water quality standards, but that the deadline for compliance (December 1, 1994) had been extended indefinitely by the pending permit renewal application. In 2001, Dr. Lane twice petitioned the Department for a declaratory statement regarding the Department's interpretation of certain provisions of the 1989 Consent Order. The first petition was denied by the Department because Dr. Lane failed to adequately state her interests and because she was a party in a pending case in which the Consent Order was at issue. Dr. Lane second petition was denied for similar reasons. Over 14 years after the deadline established in the 1989 TOP for the mill to be in compliance with all applicable standards in Elevenmile Creek, IP is still not meeting all applicable standards. However, the combination of (1) Consent Order terms that contemplated unspecified future permit requirements based on yet-to-be-conducted studies, (2) the wording in the TOP that tied the deadline for compliance to the expiration of the TOP, and (3) the administrative extension of the TOP, kept the issue of Champion's and IP's compliance in a regulatory limbo. It increased the Department's discretion to determine whether IP was in compliance with the laws enacted to protect the State's natural resources, and reduced the opportunity of interested persons to formally disagree with that determination. The Proposed Authorizations A. In General In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WWTP upgrades consist of converting to a modified activated sludge treatment process, increasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (mgd). IP proposes to convey the treated effluent by pipeline 10.7 miles to a 1,464-acre wetland tract owned by IP5, where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department issued a Notice of Intent to Issue the proposed NPDES permit, together with Consent Order No. 04-1202, Authorization for Experimental Use of Wetlands Order No. 04-4442, and Waiver Order No. 04-0730. An exemption from water quality criteria in conjunction with the experimental use of wetlands for wastewater treatment is provided for in Florida Administrative Code Rule 62-660.300(1). The proposed exemption order would exempt IP from Class III water quality criteria for pH, DO, transparency, turbidity, and specific conductance. The proposed waiver order is associated with the experimental use of wetlands exemption and relieves IP of the necessity to comply with two exemption criteria related to restricting public access to the area covered by the exemption. The Department and IP contend that restricting public access to Tee and Wicker Lakes is unnecessary. The proposed Consent Order is an enforcement document that is necessary if the mill is to be allowed to operate despite the fact that its wastewater discharge is causing violations of water quality standards. A principal purpose of the proposed Consent Order is to impose a time schedule for the completion of corrective actions and compliance with all state standards. The proposed Consent Order would supersede the 1989 Consent Order. The Proposed NPDES Permit 1. WWTP Upgrades IP's primary objective in upgrading the WWTP was to reduce the nitrogen and phosphorus in the mill's effluent discharge. The upgrades are designed to reduce un-ionized ammonia, total soluble nitrogen, and phosphorus. They are also expected to achieve a modest reduction of BOD and TSS. Upgraded pond 1 is expected to convert soluble BOD to suspended solids and to accomplish other biological conversions seven or eight times faster than the current pond 1. The modification of pond 3 to an activated sludge system is expected to more rapidly remove and recycle the solids back into pond 1. Pond 3 will have a much larger bacterial population to treat the effluent. There would also be additional pH control at the end of pond 3. IP would continue to use its Rock Crossing Landfill for disposal of wastewater sludge removed from the WWTP. Authorization for the landfill is part of the proposed NPDES permit. Groundwater monitoring beneath the landfill is required. The WWTP upgrades would include increased storm surge capacity by converting two existing aeration and settling basins (ponds 2 and 4) to storm surge basins. The surge basins would allow the mill to manage upsets and to withstand a 25-year, 24-hour storm event of 11 inches of rain. Rainfall that falls into the production areas would flow to the WWTP, and be impounded in ponds 2 and 4. After the storm event this impounded water would flow back through the WWTP where it would be treated before flowing through the compliance point and into the pipeline to the wetland tract. The Department required IP to monitor for over 129 pollutants in its stormwater runoff from the mill’s manufacturing facility, roads, parking lots, and offsite nonpoint sources. No pollutants were found in the stormwater at levels of concern. The average volume of mill discharge would be mgd. IP plans to obtain up to 5 mgd of treated municipal wastewater from a new treatment facility planned by the Emerald Coast Utility Authority (ECUA), which would be used in the paper production process and would reduce the need for groundwater withdrawals by IP for this purpose. The treated wastewater would enter the WWTP along with other process wastewater, be treated in the same manner in the WWTP, and become part of the effluent conveyed through the pipeline to the wetland tract. 2. Effluent Limitations The effluent limitations required by the proposed permit include technology-based effluent limits (TBELs) that apply to the entire pulp and paper industry. TBELs are predominantly production-based and are designed to limit the amount of pollutants that may be discharged per ton of product produced. The Cantonment mill has not had a problem in meeting TBELs. The TBELs that IP must meet are in the "Cluster Rule" promulgated by the EPA and adopted by the Department. The mill already meets the TBELS applicable to its current bleaching operation. In fact, EPA determined that the mill was performing in the top 5 percent of similar mills in the nation. The mill would have to meet the TBELs for a brown kraft operation if that conversion is made by IP. The proposed permit also imposes water quality- based effluent limits (WQBELs) that are specific to the Cantonment mill and the waters affected by its effluent discharge. The WQBELs for the mill are necessary for certain constituents of the mill's effluent because the TBELs, alone, would not be sufficient to prevent water quality criteria in the receiving waters from being violated. For example, the TBEL for BOD for similar pulp and paper mills is 15,943 pounds per day (ppd) on a monthly average, but the WQBEL for BOD for the Cantonment mill would be 4,500 ppd in summer and 5,100 ppd in winter. Dr. Livingston developed an extensive biological and chemical history of Perdido Bay and then evaluated the nutrient loadings from Elevenmile Creek over a 12-year period to correlate mill loadings with the biological health of the Bay. Because Dr. Livingston determined that the nutrient loadings from the mill that occurred in 1988 and 1989 did not adversely impact the food web of Perdido Bay, he recommended effluent limits for ammonia nitrogen, orthophosphate, and total phosphorous that were correlated with mill loadings of these nutrients in those years. The Department used Dr. Livingston’s data, and did its own analyses, to establish WQBELs for orthophosphate for drought conditions and for nitrate-nitrite. WQBELs were ultimately developed for total ammonia, orthophosphate, nitrate-nitrite, total phosphorus, BOD, color, and soluble inorganic nitrogen. The WQBELs in the proposed permit were developed to assure compliance with water quality standards under conditions of pollutant loadings at the daily limit (based on a monthly average) during low flow in the receiving waters. The proposed permit also establishes daily maximum limits (the most that can be discharged on any single day). For BOD, the daily maximum limit is 9,000 ppd. William Evans, the Department employee with primary responsibility for the technical review of the proposed Department authorizations, said that setting the daily maximum limit at twice the monthly average was a standard practice of the Department. The maximum daily limits are not derived from the Livingston studies. Dr. Glen Daigger, a civil and environmental engineer, designed a model for the WWTP and determined the modifications necessary to enable the WWTP's discharge to meet all TBELs and WQBELs. Petitioners did not dispute that the proposed WWTP is capable of achieving the TBELs and WQBELs. Their main complaint is that the WQBELs are not adequate to protect the receiving waters. 3. Discharge to the Wetland Tract IP proposes to relocate its discharge to the wetland tract as a means to end decades of failure by the mill to meet water quality standards in Elevenmile Creek. Discharging to the wetland tract, which flows to the marine waters of lower Elevenmile Creek and Perdido Bay, avoids many of the problems associated with trying to meet the more stringent water quality standards applicable in a freshwater stream. An effluent distribution system is proposed for the wetland tract to spread the effluent out over the full width of the wetlands so that their full assimilative capacity is utilized. This would be accomplished by a system of berms running perpendicular to the flow of water through the wetlands, and gates and other structures in and along the berms to gather and redistribute the flow as it moves in a southerly direction toward Perdido Bay and lower Elevenmile Creek. The design incorporates four existing tram roads that were constructed on the wetland tract to serve the past and present silviculture activities there. The tram roads, with modifications, would serve as the berms in the wetland distribution system. As the effluent is discharged from the pipeline, a point designated D-003, it would be re-aerated6 and distributed across Berm 1 through a series of adjustable, gated openings. Mixing with naturally occurring waters, the effluent would move by gravity to the next lower berm. The water will re-collect behind each of the vegetated berms and be distributed again through each berm. The distance between the berms varies from a quarter to a half mile. Approximately 70 percent of the effluent discharged at D-003 would flow by gravity a distance of approximately 2.3 miles to Perdido Bay. The remaining 30 percent of the effluent would flow a shorter distance to lower Elevenmile Creek. A computer simulation performed by Dr. Wade Nutter, an expert in hydrology, soils, and forested wetlands, indicated that the effluent discharged at D-003 will move through the wetland tract at a velocity of approximately a quarter-of-a-foot per second and the depth of flow across the wetland tract will be about one-half inch. It would take four or five days for the effluent to reach lower Elevenmile Creek and Perdido Bay. As the treated effluent flows through the wetland tract, there will be some removal of nutrients by plants and soil. Nitrogen and phosphorous are expected to be reduced approximately ten percent. BOD in the effluent is expected to be reduced approximately 90 percent. Construction activities associated with the effluent pipeline and berm modifications in the wetland tract were permitted by the Department in 2003 through issuance of a Wetland Resource Permit to IP. The United States Army Corps of Engineers has also permitted this work. No person filed a petition to challenge those permits. A wetland monitoring program is required by the proposed permit. The stated purpose of the monitoring program is to assure that there are no significant adverse impacts to the wetland tract, including Tee and Wicker Lakes, and is referred to as the No Significant Adverse Impact (NSAI) analysis. A year of "baseline data" on the wetlands and Tee and Wicker Lakes was collected and submitted to the Department for use in developing the NSAI analysis, but was not made a part of the record in this case. After the discharge to the wetland tract commences, the proposed permit requires IP to submit wetland monitoring reports annually to the Department. A monitoring program was also developed by Dr. Livingston and other IP consultants to monitor the impacts of the proposed discharge on Elevenmile Creek and Perdido Bay. It was made a part of the proposed permit. The Exemption for Experimental Use of Wetlands Florida Administrative Code Rule 62-660.300(1) provides an exemption from water quality criteria for the experimental use of wetlands. The proposed Authorization for Experimental Use of Wetlands Order would exempt IP from Class III water quality criteria for pH, DO, transparency, turbidity, and specific conductance. The proposed exemption order sets forth "interim limits" for pH, DO, color, turbidity, and specific conductance. The proposed exemption order also states that IP may petition for alternative water quality criteria pursuant to Florida Administrative Code Rule 62- 66D.300(1)(b)(c) and (d). The exemption is for 5 years beginning with the commencement of discharge into the wetland tract at D-003. The exemption it can be renewed by IP by application to the Department. The Waiver To qualify for the experimental use of wetlands exemption, Florida Administrative Code Rules 62- 660.300(1)(a)3 and 4 require, respectively, that the public be restricted from the exempted wetland area and that the waters not be used for recreation. IP proposes to prevent public access to the area of the wetland tract where the effluent distribution system is located. This is the freshwater area of the wetland tract and includes the four berms. However, IP does not want, nor believe it is necessary, to prevent public access and recreation on Tee and Wicker Lakes within the tidal marsh below berm 4. These lakes are accessible by boat from Perdido Bay and are used now by the public for boating and fishing. The Proposed Consent Order The proposed Consent Order establishes a schedule for the construction activities associated with the proposed WWTP upgrades and the effluent pipeline and for incremental relocation of the mill's discharge form Elevenmile Creek to the wetland tract. IP is given 24 months to complete construction activities and begin operation of the new facilities. At least 25 percent of the mill's effluent must be diverted to the wetland tract. At least 25 percent of the effluent is to be diverted to the wetland tract when the new facilities begin operations. The volume of effluent diverted to the wetlands is to increase another 25 percent every three months thereafter so that three years after issuance of the permit 100 percent of the effluent is being discharged into the wetland tract and there is no longer a discharge at D-001 into Elevenmile Creek.7 The proposed Consent Order establishes interim effluent limitations that would apply immediately upon the effective date of the Consent Order and continue during the 24-month construction period when the mill will continue to discharge into Elevenmile Creek. Other interim effluent limits would apply during the 12-month period following construction when the upgraded WWTP would be operating and the effluent would be incrementally diverted from Elevenmile Creek to the wetland tract. A third set of interim effluent limits would apply at D-003 when 100 percent of the discharge is into the wetland tract. They include the interim limits for specific conductance, pH, DO, color, and turbidity established through the experimental use of wetland exemption. The proposed Consent Order requires IP to submit a report within six months with the results of the 2004 transparency study. The Department must be satisfied that the study shows the transparency standard will not be violated before the wetlands can be used for the discharge. This report has already been submitted to the Department, but the Department has not yet completed its review of the report. Nevertheless, it was admitted into the record as IP Exhibit 79. The proposed Consent Order provides that, in the event IP's does not receive treated sanitary wastewater from the planned ECUA facility, IP will notify the Department and submit an alternate compliance plan to the Department for the Department's approval. The submittal and approval of an alternate compliance plan would extend the time for compliance with water quality standards by another six months. The Department amended the proposed Consent Order at the conclusion of the hearing to provide for notice to the public and an opportunity for persons to object to the Department's action on any alternate compliance plan. The Consent Order requires a "Plan of Action" to determine "whether there remains a critical period for ortho-phosphate loading to lower Elevenmile Creek and Perdido Bay." The proposed Consent Order requires IP to submit within 97 months (which would allow for five years of discharge to the wetland tract) a final report on whether there has been significant adverse impacts in the wetlands and Tee and Wicker Lakes resulting from the discharge of effluent pursuant to the interim limits for pH, DO, specific conductance, turbidity, and color. If the NSAI analysis shows no significant adverse impact has occurred, the proposed Consent Order contemplates that IP or the Department would establish alternative water quality criteria that would apply permanently in the wetland tract. IP is required by the Consent Order to submit quarterly progress reports of its progress toward compliance with the required corrective actions and deadlines. The Consent Order imposes a "stipulated penalty" of $500 per day for noncompliance with its terms. It also contains a statement that a violation of its terms may subject IP to civil penalties up to $10,000 per day. The Principal Factual Disputes A. The Evidence in General Much of the water quality and biological data presented by Petitioners were limited in terms of the numbers of samples taken, the extent of the area sampled, and the time period covered by the sampling. Much of the expert testimony presented by Petitioners was based on limited data, few field investigations, and the review of some, but not all relevant permit documents.8 On the other hand, the Livingston studies represent perhaps the most complete scientific evaluation ever made of a coastal ecosystem. Even Dr. Lane called the Livingston studies "huge" and "amazing." Therefore, with regard to the factual issues raised by Petitioners that involved scientific subjects investigated in the Livingston studies, Petitioners' data and the expert opinions based on those data were generally of much less weight than the data and conclusions of the Livingston studies. However, the Livingston studies did not address all of the factual issues in dispute. Some of the evidence presented by Petitioners regarding historical water quality conditions in Perdido Bay and Elevenmile Creek was lay testimony. The lay testimony was competent and sufficient to prove the existence of environmental conditions that are detectable to the human senses, such as an offensive smell, a dark color, or a sticky texture. Historical Changes in Perdido Bay Petitioners claim that, before the Cantonment mill began operations in the 1940s, Perdido Bay was a rich and diverse ecosystem and a beautiful place for swimming, fishing, boating, and other recreational activities. Petitioners blame the mill effluent for all the adverse changes they say have occurred in Perdido Bay. Petitioners claim that the water in Perdido Bay was much clearer before the mill was built. James Lane, who has lived on the Bay for 65 years, said he began to notice in the late 1940s that the water was becoming dark and filled with wood fibers. Mr. Lane recalls that there used to be an abundance of fish in the Perdido Bay, including croakers, pinfish, flounder, redfish, minnows, and catfish. Now Mr. Lane sees few of these fish in the Bay and he believes the remaining fish are unfit to eat because they look diseased to him. Mr. Lane said there were extensive areas of sea grasses in the Bay which supported large numbers of shrimp, crabs, and mussels, but these grasses are now gone. The Lane family used to enjoy swimming in Perdido Bay but stopped swimming years ago because the water felt sticky and often had a brown foam or scum on the surface. Mr. Lane and others members of FOPB claim to have gotten infections from swimming in the Bay. Mr. Lane and other witnesses described the odor of Elevenmile Creek near the mill as unpleasant and, at times, offensive. They consider the Creek to be too polluted for swimming. Donald Ray, who has been a Department biologist for 30 years, said he has received many complaints from citizens about the conditions in Perdido Bay. He said the foam that occurs in Perdido Bay is not natural foam, but one that persists and leaves a stain on boats. On the other hand, it is Dr. Livingston's opinion that the ecological problems of Perdido Bay are due primarily to the opening of Perdido Pass around 1900. The opening of the pass allowed Gulf waters to enter Perdido Bay and caused salinity stratification in the Bay, with marine waters on the bottom and fresh water from the Perdido River, Elevenmile Creek, and other tributaries on the top. The stratification occurs regularly in the lower Bay, but only during low flow conditions in most of the upper Bay, Perdido River, and Elevenmile Creek. It restricts DO exchange between the upper and lower water layers and results in low DO levels in the lower layer. Low DO, or "hypoxia," is the primary cause of reduced biological diversity and productivity in Perdido Bay. Dr. Livingston's initial study of the Perdido Bay system (1988-91) included an investigation of historical conditions, using documents and maps, anecdotal statements of area residents, as well as historic water quality and sediment data. Dr. Livingston found general agreement from most sources that: [P]rior to the 1940s, the various rivers and the bay in the Perdido Basin were quite different from what they are today. Eyewitness accounts from 1924 indicate a bay that was clear and "bluish" in color; the bottom could be seen at depths of five feet. According to resident' accounts, seagrasses grew from Garth Point to Witchwood; the grassbeds provided cover for many shrimp that were taken at the time. Flounder were taken with gigs and crabs were taken with hand nets. According to these accounts, the water from the various rivers and creeks in the area was relatively clear, and white sand/gravel bottoms were dominant forms of habitat in the freshwater and estuarine systems. The water was tea- colored but clear. Redfish, trout, blue crabs, shrimp, and mullet were abundant. * * * [T]hrough the early 1900s, the Elevenmile Creek was said to be crystal clear with soft white sand and good fishing. * * * According to various reports, in the early 1950s, the waters of Elevenmile Creek turned black, with concentrations of foam observed floating on the surface. By 1986, more than 28 million gallons of largely untreated effluent was flowing into the Elevenmile Creek- Perdido Bay system each day. Experiments by the Florida Game and Fresh Water Fish Commission had shown that the creek waters were lethal. The Florida Board of Health reported that Elevenmile Creek was "grossly polluted" and that Perdido Bay had been "greatly degraded within the 1.5 mile radius of where Elevenmile Creek dumped into the bay." Nevertheless, Dr. Livingston discounted much of this historical record, especially with regard to the belief that the mill's effluent had adversely affected Perdido Bay, because it was not based on what he considers reliable scientific data. He found "little evidence in the long- term sediment record of a direct response to historical activities of the pulp and paper mill, suggesting that the flushing capacity of Perdido Bay quickly diluted effluents that enter Perdido Bay from Elevenmile Creek." The evidence is persuasive that the salinity stratification in Perdido Bay is a major cause of low DO in the Bay.9 However, the stratification does not explain all of the observed changes in water quality, biological productivity, and recreational values. The stratification does not account for the markedly better conditions in the Bay that existed before the Cantonment paper mill began operations. The Livingston studies confirmed that when nutrient loadings from the mill were high, they caused toxic algae blooms and reduced biological productivity in Perdido Bay. As recently as 2005, there were major toxic blooms of heterosigma in Tee and Wicker Lakes caused by increased nutrient loading from the mill. Other competent evidence showed that the mill's effluent has created nuisance conditions in the past, such as foam and scum, which adversely affected the recreational values of these public waters. Some of the adverse effects attributable to the mill effluent were most acute in the area of the Bay near the Lanes' home on the northeastern shore of the Bay, because the flow from the Perdido River tends to push the flow from Elevenmile Creek toward the northeastern shore. Petitioners were justified in feeling frustrated in having their concerns about the adverse impacts of the mill's effluent discounted for many years, and in having to wait so long for an effective regulatory response. However, with regard to many of their factual disputes, Petitioners' evidence lacked sufficient detail regarding the dates of observations, the locations of observations, and in other respects, to distinguish the relative contribution of the mill effluent from other factors that contributed to the adverse impacts in the Bay, such as salinity stratification, natural nutrient loading from the Perdido River and other tributaries, and anthropogenic sources of pollution other than the paper mill.10 Petitioners generally referred to the mill effluent and its impacts to Perdido Bay as if they have been relatively constant for 65 years. The Livingston studies, however, showed clearly that the mill effluent and its impacts, as well as important factors affecting the impacts, such as drought, have frequently changed. Focusing on the fact that the average daily BOD loading allowed under the proposed permit would be same as under the 1989 TOP (4,500 ppd), Petitioners remarked several times at the final hearing that the proposed permit for the mill was no different than the existing permit. According to Petitioners, if the mill is allowed to operate under the proposed permit, one can predict that the future adverse impacts to Perdido Bay will be the same as the past adverse impacts. However, the 1989 TOP and the proposed permit are very different. Therefore, it cannot be assumed that the impacts would be the same. Petitioners' evidence was generally insufficient to correlate past adverse impacts to Perdido Bay with the likely impacts that would occur under the proposed permit. In contrast, that was the focus of the Livingston studies. Development of the WQBELs Whether Perdido Bay is an Alluvial System and Whether Elevenmile Creek is a Blackwater Stream Alluvial systems are generally characterized by relatively high nutrient inputs from tributaries and associated wetlands that provide for high biological productivity in the receiving bay or estuary. Petitioners disagree with Dr. Livingston's characterization of the Perdido Bay system as an alluvial system. Petitioners presented the testimony of Donald Ray, a Department biologist, who said that the Perdido River is not an alluvial river and the natural nutrient loadings to Perdido Bay are less than would occur in an alluvial system. Although it is curious that two experienced biologists cannot agree on whether Perdido Bay is part of an alluvial system, the dispute is immaterial because it was not shown by Petitioners that any of the four proposed Department authorizations is dependent on the applicability of the term "alluvial." The WQBELs developed by Dr. Livingston, for example, were not dependent on a determination that Perdido Bay meets some definition of an alluvial system, but were based on what the data indicated about actual nutrient loadings into Perdido Bay and the Bay's ecological responses to the loadings. If the dispute is not immaterial, then Dr. Livingston's opinion that Perdido Bay is part of an alluvial system is more persuasive, because he has greater experience and knowledge of the coastal bay systems on the Florida Panhandle than does Mr. Ray. Petitioners also take exception to Dr. Livingston's characterization of Elevenmile Creek as a blackwater creek. Petitioners claim Elevenmile Creek is naturally clear to "slightly tannic" stream. This dispute, however, is also immaterial because the proposed permit calls for the termination of the mill's discharge to Elevenmile Creek, including its contribution of color to the Creek. Petitioners assert that Dr. Livingston's characterizations of Perdido Bay as an alluvial system and Elevenmile Creek as a blackwater creek show he is biased and that his "overall analysis" lacks credibility. Dr. Livingston's opinions on these points do not show bias nor compromise the credibility of his overall analysis of the Perdido Bay system, which is actually the product of many scientists and based on 18 years of data.11 2. Selection of 1988 and 1989 Mill Loadings as a Benchmark for the WQBELs Generally, the Department establishes effluents limits for nutrients based on Chlorophyl A analysis. However, the Livingston studies showed that Chlorophyl A was not significantly associated with plankton blooms in Perdido Bay. Therefore, the Department accepted Dr. Livingston's recommendation to base the WQBELs for nutrients on the nutrient loading from the mill in 1988 and 1989, which the Livingston studies showed were good years for Perdido Bay with respect to its biological health. Phytoplankton are a fundamental component of the food web in Perdido Bay. The number of phytoplankton species is a sensitive indicator of the overall ecological health of the Bay. The Livingston studies showed that the loadings of ammonia and orthophosphate from the mill had a direct effect on the number of phytoplankton species. In the years when the mill discharged high loadings of ammonia and orthophosphate, there were toxic algae blooms and reduced numbers of phytoplankton species. In 1988 and 1989, when the loadings of ammonia and orthophosphate were lower, there were no toxic algae blooms, and there were relatively high numbers of phytoplankton species. Petitioners dispute that 1988 and 1989 are appropriate benchmarks years for developing the WQBELs because Petitioners claim there were high nutrient loadings and algae blooms in those years. Mr. Ray testified that the Department received citizen complaints about algae blooms in those years. Dr. Livingston's analysis was more persuasive, however, because it distinguished types of algae blooms according to their harmful effect on the food web and was based on considerably more water quality and biological data. Petitioners also presented water quality data collected from 1971 to 1994 by the Bream Fishermen Association at one sampling station in the northeastern part of Perdido Bay, which indicate that in 1988 and 1989, the concentrations of nutrients were sometimes high. The proposed nutrient WQBELs were derived from data about the actual response of the Perdido Bay ecosystem over time to various inputs. The sampling data from the Bream Fishermen Association were not correlated to ecosystem response and, therefore, are insufficient to refute Dr. Livingston's evidence that 1988 and 1989 were years of relatively high diversity and productivity in Perdido Bay. Furthermore, nutrients loadings would be reduced under the proposed permit. 3. DO and Sediment Oxygen Demand The parties agreed that sediment oxygen demand (SOD) is a major reason for the low DO in Perdido Bay in areas where there is salinity stratification. SOD is caused by the bacterial degradation of particulate organic matter that settles to the bottom. SOD decreases DO in the lower water layer, but also can cause a reduction of DO in the surface layer. Low DO has substantially reduced the biological productivity of Perdido Bay. Thomas Gallagher, an environmental engineer and water quality modeling expert, showed that even without the mill discharge, DO in the bottom waters of Perdido Bay would fall below the applicable Class III water quality standard of 5 mg/l. Low DO conditions are now a "natural" characteristic of the Bay, usually occurring during summer and early fall when freshwater flows are low and temperatures are high. At these times, surface water DO levels are usually above the state standard, but DO in the bottom waters usually range between 1.0 and 2.0 mg/l. Petitioners claim that the dominant source of the sediment in Perdido Bay is the carbon and nutrient loading in the mill's effluent that flows into the Bay from Elevenmile Creek. Mr. Ray, who sampled sediments in Perdido Bay over several years for the Department, believes that the mill effluent is the main source of the sediment and, consequently, the sediment oxygen demand. Dr. Livingston did extensive sediment analyses in Perdido Bay. He compared the data with sediment data from other bays on the Florida Panhandle. It is Dr. Livingston's opinion that the mill effluent contributes little to the sediments or SOD in Perdidio Bay. His initial three-year study concluded: [T]he hypoxic conditions of Elevenmile Creek are due, in part, to mill discharges. However, low dissolved oxygen conditions at depth in Perdido Bay are not due to the release of mill effluents from Elevenmile Creek, and can actually be attributed to a long history of human activities that include alteration of the hydrological interactions at the gulfward end of the estuary. The entry of saline water from the Gulf and the resulting stratification have been coupled with various forms of human development that release carbon, nitrogen, and phosphorus compounds into the estuary. The landward movement of high-salinity water from the Gulf of Mexico, laden with various types of oxygen-consuming compounds from various sources, together with oxygen demand from sediments to the lower water column that is isolated from reaeration due to salinity stratification, are thus responsible for a large portion of the observed hypoxic conditions at depth in Perdido Bay. [The paper mill] is responsible for a relatively small amount of these oxygen-consuming effects. In East Bay, which is a part of Escambia Bay and a relatively pristine system, there was SOD that caused DO to fall below standards in the lower water layer. Dr. Livingston also found severe oxygen deprivation at times in the lower waters of the Styx River and Perdido River, which do not receive mill effluent. Dr. Livingston believes the low DO that occasionally occurs in these rivers is due to agricultural runoff, urban discharges, and natural organic loading from adjacent wetlands. There was extensive evidence, some of which was presented by Petitioners, showing that the mill loadings of carbon and nutrients are less than the loadings from the Perdido River. Mr. Gallagher concluded that the sediment in the Bay is mostly "terrestrial carbon," and not from the mill's effluent. His water quality modeling work determined that the mill's effluent reduced bottom layer DO by about 0.1 mg/l. Dr. Lane believes that the organic solids in the mill's effluent are accumulating in Perdido Bay sediments, but Mr. Gallagher pointed out that degrading solids cannot accumulate because they are degrading. In addition, Mr. Gallagher said that logic dictates that solids that have not settled out after spending several days in the settling basins of IP's WWTP are not going to readily settle in the more turbulent environment of Perdido Bay. Some of the solids are oxidizing or being transported into the Gulf. Mr. Gallagher determined that in summer and late fall, 60 percent of the water in the bottom layer in the upper Bay is from the Gulf and almost all the rest is from the Perdido River. He believes only 0.1 to 2.0 percent of the water in the bottom layer is mill effluent. Dr. Livingston responded to the BOD and carbon issues that "these Petitioners raised over the years" by investigating them as part of the Livingston studies. He found no relationship between loading and DO. Dr. Livingston concluded that the mill was not having much effect on SOD. Dr. Livingston and Mr. Gallagher referred to a carbon isotope study of the sediment in Perdido Bay by Coffin and Cifuentes. The isotope study was a part of the initial three-year Livingston study entitled "Ecological Study of the Perdido Bay Drainage System." The study identified a unique carbon isotope in the mill's effluent and looked for traces of the isotope in the sediments of Perdido Bay. Very little of the carbon isotope was found in the sediments, suggesting that the mill's effluent was not contributing much to the sediments. The carbon isotope study was not offered into evidence. Petitioners assert that the isotope study is hearsay and cannot be used to support a finding of fact.12 However, Dr. Livingston's opinion about the sources of the sediment was not based solely on the isotope study. The isotope study was consistent with his other studies and with Mr. Gallagher's water quality modeling analysis. Therefore, the conclusions of the isotope study serve to support and explain Dr. Livingston's expert opinion that the mill effluent is not the primary source of the sediment and low DO in Perdido Bay. Dr. Livingston summarized his opinion regarding DO and SOD as follows: "all of these lines of evidence, from all the bays that I have worked in and from them scientific literature and from our own studies, every line of evidence simply eliminated the pulp mill as the primary source of the low dissolved oxygen in the bay." 4. Long-term BOD BOD is a measurement of the oxygen demand exerted by the oxidation of carbon, nitrogen, and the respiration of algae. A five-day BOD analysis is the standard test used in the regulatory process. The use of the standard five-day BOD measurement is not restricted to organic material that is expected to completely degrade in five days. Five days is simply the time period selected to standardize the measurement. For example, the five-day BOD analysis is used in the regulation of domestic wastewater even though most of the organic material in domestic wastewater takes about 60 days to degrade and would exert an oxygen demand throughout the 60 days. It was undisputed that paper mill effluent will continue to consume DO after five days. One estimate given was that it would take 100 days to completely degrade. Some of the naturally occurring organic material flowing into Perdido Bay from the Perdido River and Gulf of Mexico would also include material with long-term BOD. Petitioners claim that long-term BOD analysis is essential to determine the true impacts of the mill's effluent on Perdido Bay, but they failed to show that the Livingston studies did not consider long-term BOD.13 The evidence shows that Dr. Livingston's studies accounted for DO demand in all its forms and for any duration. Dr. Livingston's studies focused on the response of Perdido Bay's food web to nutrients and various other inputs as they changed over time. If long-term BOD was having an adverse effect on the food web, the Livingston studies were designed to detect that effect. Dr. Livingston's opinion is that long-term BOD is not a significant problem for Perdido Bay because the Bay is part of a dynamic system and the sediments are regularly flushed out or otherwise recycled in a matter of a few months, not years.14 5. Carbon Dr. Lane, who is a marine biologist, believes a major reason for low DO in Perdido Bay is "organic carbonaceous BOD." However, Dr. Lane presented no evidence other than statements of the theoretical process by which carbon from the mill would cause low DO in the Bay. She presented no scientific data from Perdido Bay to prove her theory.14 Dr. Livingston said that 16 years of studies in the Bay have found DO and carbon to be "totally uncorrelated." Other Water Quality Issues 1. Toxicity Petitioners allege that the mill effluent has had occasional problems passing toxicity tests. Un-ionized ammonia is the likely cause, and the reduction of un-ionized ammonia in the proposed permit and the distribution of the effluent over the wetland tract should prevent toxicity problems from recurring. Dr. Livingston examined tissue samples from various fish and invertebrates and found low levels of bioconcentrating chlorine compounds in Perdido Bay that he believes were "probably associated with discharges from the Pensacola mill." Although they are toxic substances, Dr. Livingston found no diseased organisms and no evidence of food web magnification of these potentially bioaccumulable compounds. Mr. Ray testified that Perdido Bay was the worst of all the bays he has studied in terms of high sediment metals. Most of his sediment sampling was done in 1977 through 1983, years before the Livingston studies got started. His knowledge about subsequent years was based on only two samples, one in 1988 and another in 2005.16 Dr. Lane did an analysis of 12 sediment samples in Perdido Bay, Perdido River, and Elevenmile Creek in 1999 and concluded that "Eleven Mile Creek appears to be the source of all elevated levels [of metals] except silver." The Livingston studies included toxics analysis of Perdido Bay sediments, including metals, dioxin, and other chlorinated organic compounds. Dr. Livingston testified that metal concentrations in the sediments of Elevenmile Creek did not differ from the metal concentrations in the Perdido River and other streams in the area. The concentrations were not significantly different from concentrations in other bays he has studied that do not have a paper mill discharge. 2. Mutagenic Compounds Petitioners claim that there are chemicals in paper mill effluent that are mutagenic and are causing changes in the sex of fish. They introduced an exhibit from the Department's exhibit list (DEP Exhibit 38) that discussed investigations of effluent from the Cantonment mill and other Florida paper mills which found abnormally high testosterone levels and related mutations in female Gambusia fish. The most recent such study16 implicates androgens produced by the microbial degradation of natural chemicals in the trees pulped at the mills, especially softwood trees (pines), as the cause. Petitioners believe IP's proposal to begin using 100 percent pine at the Cantonment mill could cause mutations in fish and other animals exposed to the mill's effluent. Although IP and the Department are aware of the sex change studies, there was no evidence presented that the subject was investigated or addressed by them in the permitting process. DEP Exhibit 38 is hearsay and no non-hearsay evidence was presented on the issue of mutagenic compounds in the mill's effluent. Therefore, no finding of fact in this Recommended Order can be based on the data and analysis in DEP Exhibit 38.18 Furthermore, Petitioners did not raise the issue of mutagenic compounds in the mill's effluent discharge in their petitions for hearing or in the pre-hearing stipulation.19 Antidegradation Policy Petitioners claimed the proposed permit violated the antidegradation policy for surface waters established in Florida Administrative Code Rule 62-302.300(1). An element of that policy is to require, for any discharge that degrades water quality, a demonstration that the degradation is necessary or desirable under circumstances which are clearly in the public interest. Florida Administrative Code Rule 62-4.242(1)(a) contains a list of factors to be considered and balanced in applying the antidegradation policy. These include consideration of whether the proposed project would be beneficial to public health, safety, or welfare and whether the discharge would adversely affect the, conservation of fish and wildlife, and recreational values. The greater weight of the evidence supports the position of IP and the Department that the proposed discharge to the wetland tract would be an improvement over the existing circumstances. However, as discussed below, there was an insufficient demonstration that the discharge would not cause significant adverse impact to the biological community within the wetland tract, and there was an insufficient demonstration that the Perdido River OFW would not be significantly degraded. Without sufficient demonstrations on these points, it is impossible to find that the degradation has been minimized. Petitioners did not prove that the proposed project was not in the public interest, but the burden was on IP to show the opposite. Because IP did not make a sufficient demonstration regarding potential adverse impacts on the biological community within the wetland tract and on the Perdido River OFW, IP failed to prove compliance with Florida's antidegradation policy. Perdido River OFW Florida Administrative Code Rule 62-302.300(2) contains the standards applicable to OFWs and prohibits a discharge that significantly degrades an OFW unless the proposed discharge is clearly in the public interest or the existing ambient water quality of the OFW would not be lowered.20 Petitioners contend that the water quality of the Perdido River would be significantly degraded by the mill's effluent under the authorizations. Mr. Gallagher's modeling analysis predicted improved water quality in the Perdido River for DO and several other criteria over the conditions that existed in 1979, the year the river was designated as an OFW. However, the modeling also predicted that the discharge would reduce the DO in the river (as it existed in 1979) by .01 mg/l under unusual conditions of effluent loading at the daily limit (based on a monthly average) during a drought. Mr. Gallagher's modeling indicated that a very small (less than 0.1 mg/l) reduction in DO in the surface water of the lower Perdido River would occur as a result of the proposed project. He considered that to be an "insignificant" effect and it was within the model's range of error. However, IP made the wrong comparisons in its modeling analysis to determine compliance with the OFW rule, Florida Administrative Code Rule 62-4.242(2). Mr. Gallagher used the model to compare the DO levels in the Perdido River that would result from the mill's discharge of BOD at the proposed permit limit of 4,500 ppd with the predicted DO levels that would have existed in 1979 if St. Regis was discharging 5,100 ppd of BOD. IP should have compared the DO levels resulting from the proposed permit with the actual DO levels in 1979, or at least the DO levels that the model would have simulated using actual BOD loadings by St. Regis in 1979. The DO levels that would have existed in 1979 if St. Regis had discharged 5,100 ppd of BOD are irrelevant. No DO data from 1979 were presented at the hearing and no explanation was given for why DO data for 1979 were not used in the analysis. No evidence was presented that St. Regis discharged 5,100 ppd of BOD as a monthly average in 1979.21 It might have discharged substantially less.22 Petitioners did not prove that the proposed permit would significantly degrade the Perdido River, but the burden was on IP to show the opposite. Because the wrong anti-degradation comparison was made, IP failed to provide reasonable assurance that the Perdido River would not be significantly degraded by the proposed discharge. The Experimental Use of Wetlands Exemption Petitioners claim that IP did not demonstrate compliance with all the criteria for the experimental use of wetlands exemption. There are seven criteria set forth in Florida Administrative Code Rule 62-660.300(1)(a) that must be met to qualify for the exemption. IP is seeking a waiver from two of the criteria and those will be discussed later in this Recommended Order. Impact on the Biological Community a. In General Florida Administrative Code Rule 62- 660.300(1)(a)1 requires a demonstration that "the wetlands ecosystem may reasonably be expected to assimilate the waste discharge without significant adverse impact on the biological community within the receiving waters." Dr. Nutter used a "STELLA" wetland model to predict the effects of discharging mill effluent to the wetland tract. The STELLA model was programmed to evaluate the "water budget" for the wetland tract, as well as simulate the fate of nitrogen, phosphorus, and total dissolved solids (TDS). Petitioners contend that the STELLA model is too limited to adequately assess potential adverse impacts on the biological community, but the model was not the sole basis upon which Dr. Nutter formed his opinions. He also relied on relevant scientific literature, his general knowledge of wetland processes, and on his 40 years of experience in land treatment of wastewater. The STELLA model predicted that there would be about a 10 percent reduction in nitrogen and phosphorus. Dr. Nutter testified that that figure was a conservative prediction and the scientific literature suggests there could be a greater reduction. Wetlands are effective in processing TSS and BOD. Dr. Nutter ran the model with the proposed permit limits and the model predicted 90 to 95 percent BOD removal before the effluent reached berm 4. Dr. Nutter expected pH levels to be in the range of background levels in the wetlands, which vary between 6.5 and 8.0.23 Dr. Nutter predicts that in high flow conditions, there will be more DO in the water flowing from the wetlands into Tee and Wicker Lakes. During low flow conditions, he predicts no change in the DO level. Background DO levels in the wetland tract now range between and 5.0 mg/l. Mr. Gallagher's water quality modeling for Perdido Bay assumed that the water flowing from the wetland tract would have a DO level of 2.0 mg/l, which Dr. Nutter believes this is a conservative estimate, meaning it could be higher. Specific Conductance A fundamental premise of the relocated discharge is that it solves the mill's decades-long failure to meet the stricter water quality standards applicable in the fresh waters of Elevenmile Creek because the new receiving waters would be marine waters. However, the majority (about 70 percent) of the wetland tract is a freshwater wetland. The tidal influence does not reach above berm 4 in the wetland tract. Before the mill's effluent reaches marine waters, it would be distributed over the entire freshwater portion of the wetland tract. Dr. Livingston explained that, but for the mill's discharge, minnows and other small "primary" freshwater fish species would be found in Elevenmile Creek. The primary fish cannot tolerate the mill's discharge because the high levels of sodium chloride and sulfide (specific conductance) cause osmoregulatory problems, disrupting their blood metabolism and ion regulation. High conductivity also eliminates sensitive microinvertebrates. Because Tee and Wicker Lakes are in the tidally influenced, southern portion of the wetland tract, the fish and other organisms in the lakes are polyhaline, which means they are adapted to rapid changes in salinity, temperature and other habitat features. That is not true of the organisms in the freshwater area of the wetland tract. A constructed wetlands pilot project was built in 1990 at the Cantonment mill. The initial operational phase of the pilot project was July 1991 through June 1993. A second phase was conducted for just three months, from September 1997 through December 1997. The pilot project generated some information about "benthic macroinvertebrate diversity," which was "low to moderate." In addition, there were "observations" made of "three amphibian species, three reptile species, approximately 31 bird species, three fish species that were introduced, and two mammal species." The information generated by the pilot project is ambiguous with respect to the effect of the effluent on fish and other organisms attributable to the specific conductance of the effluent, indicating both successes and failures in terms of survival rates. Moreover, the data presented from the pilot wetland project lacks sufficient detail, both with respect to the specific conductivity of the effluent applied to the wetlands and with respect to the response of salt-intolerant organisms to the specific conductivity of the effluent, to correlate the findings of the pilot project with the proposed discharge to the wetland tract. Freshwater wetlands do not have naturally high levels of specific conductance. The specific conductance in the wetland tract is 100 micromhos/cm or less.24 The proposed interim limit for specific conductance for the discharge into the wetland tract is "2,500 micromhos/cm or 50% above background, whichever is greater." Using total dissolved solids (TDS) as a surrogate for analyzing the effects on specific conductance, Dr. Nutter predicted that average TDS effluent concentrations would only be reduced by 1.0 percent.25 His prediction is consistent with the literature on the use of wetlands for wastewater treatment, which indicates wetlands are not effective in reducing TDS and specific conductance. The wetland tract would not assimilate TDS in mill's effluent. The potential exists, therefore, for the discharge to cause specific conductance in the freshwater area of the wetland tract to reach levels that are too high for fish and other organisms which can only live, thrive, and reproduce in waters of lower specific conductance. It was the opinion of Barry Sulkin, an environmental scientist, that the "freshwater community" would be adversely impacted by the salts in the effluent. Although the freshwater area of the wetland tract is not dominated by open water ponds, creeks, and streams,26 the evidence shows that it contains sloughs, creeks, and other surface water flow. No evidence was presented about the biological community associated with the sloughs, creeks, and other waters in the wetland tract, other than general statements about the existing plants and the trees that are being planted. Petitioners did not prove that granting the exemption would cause significant adverse impact to the biological community in the freshwater area of the wetland tract, but it was IP's burden to affirmatively demonstrate the opposite. Because IP did not adequately address the impact of increased specific conductance levels on fish and other organisms in the freshwater area of the wetland tract, IP did not provide reasonable assurance that the proposed discharge would be assimilated so as not to cause significant adverse impact on the biological community within the wetland tract. Tee and Wicker Lakes When the Department issued the proposed exemption order, it did not have sufficient data and analyses regarding Tee and Wicker Lakes to determine with reasonable confidence that these waterbodies would not be adversely impacted by the proposed discharge. A transparency study of the lakes, which IP introduced as an exhibit at the final hearing, had not previously been reviewed by Department staff. Dr. Livingston is still developing data and analyses for the lakes to use in the NSAI analysis. The proposed NSAI monitoring plan states that one of its objectives is to determine the "ecological state" of the tidal ponds, including whether the ponds "could comprise an important nursery area for estuarine populations." In addition, the monitoring is to determine "the normal distributions of salinity, temperature, color, and dissolved oxygen" in the tidal ponds. These are data that must be known before a determination is possible that the discharge would not have a significant adverse impact on the biological community associated with the lakes. Petitioners did not prove that granting the exemption would cause significant adverse impact to the biological community of Tee and Wicker Lakes, but it was IP's burden to affirmatively demonstrate the opposite. Because insufficient data exists regarding baseline conditions in Tee and Wicker Lakes, IP did not provide reasonable assurance that the proposed discharge would not cause significant adverse impact on the biological community within the wetland tract. 2. Public Interest and Public Health Florida Administrative Code Rule 62- 660.300(1)(a)2. requires the applicant to demonstrate that "granting the exemption is in the public interest and will not adversely affect public health or the cost of public health or other related programs." Public Interest Petitioners made much of a statement by Mr. Evans that the public interest consideration in this permit review was “IP’s interest”. Petitioners claimed that this statement was an admission by the Department that it gave no consideration to the public interest. However, in context, Mr. Evan's statement was not such an admission. Moreover, Florida Administrative Code Rule 62-302.300(6) expressly provides that the public interest is not confined to activities conducted solely for public benefits, but can also include private activities conducted for private purposes. The proposed exemption order does not directly address the public interest criterion, but it notes that "existing impacted wetlands will be restored." In IP's application for the exemption, it states that the exemption would "contribute to our knowledge of wetlands in general and to the refinement of performance guidelines for the application of pulp mill wastewater to wetlands." Petitioners dispute that the wetland tract is being restored. The evidence shows that some restoration would be accomplished. The natural features and hydrology of the tract have been substantially altered by agriculture, silviculture, clearing for pasture, ditching, and draining. The volume of flow in the discharge would offset the artificial drainage that occurred. A mixture of hardwood tree species would be planted, which would restore more of the diversity found in a natural forested wetland. However, an aspect of the project that could substantially detract from the goal of restoration is the transformation of the freshwater wetlands to an unnatural salty condition. Dr. Nutter said that the salt content of the mill's effluent was equivalent to Gatorade, but for many freshwater organisms, that is too salty. Another public benefit of the exemption that was discussed at the final hearing is that it would allow IP to relocate its discharge from Elevenmile Creek and thus end its adverse impacts to the Creek. That public benefit is not given much weight because IP has not shown that its adverse impacts to Elevenmile Creek cannot be eliminated or substantially reduced by decreasing its production of paper products. The evidence shows only that IP has attempted to solve its pollution problems through environmental engineering.27 A sufficient public interest showing for the purpose of obtaining the experimental use of wetlands exemption should not be a rigorous challenge if all the other exemption criteria are met, because that means the proposed wetland discharge was shown to have no harmful consequences. The public interest showing in this proceeding was insufficient, however, because the other exemption criteria were not met and there is a reasonable potential for harmful consequences. Public Health Petitioners raised the issue of the presence of Klebsiella bacteria, which can be a public health problem when they occur at high levels. The more detection of Klebsiella, however, does not constitute a public health concern. Petitioners did not show that Klebsiella bacteria exist in the mill's effluent at levels that exceed applicable water quality standards. Petitioners also did not present competent evidence about the likely fate of Klebsiella bacteria in the proposed effluent distribution system. Dr. Lane's statement that Klebsiella bacteria might be a problem is not sufficient to rebut IP's prima facie showing that the proposed permit will not cause or contribute to a violation of water quality standards applicable to pathogenic bacteria. Petitioners also point to past incidents of high total coliform concentrations in Elevenmile Creek in support of their contention that the proposed exemption poses a risk to public health. However, these past incidents in Elevenmile Creek are not sufficient to prove that fecal coliform in the effluent discharged to the wetland tract will endanger the public health. IP proposes to restrict access to the wetland distribution system. Furthermore, the fate of bacteria in the wetlands is much different than in the Creek. The more persuasive evidence is that the wetland tract would destroy the bacteria by solar radiation and other mechanisms so that bacteria concentrations in waters accessible by the public would not be at levels which pose a threat to public health. Protection of Potable Water Supplies and Human Health Florida Administrative Code Rule 62- 660.300(1)(a)5. requires the applicant for the exemption to demonstrate that "the presently specified criteria are unnecessary" to protect potable water supplies and human health, which presupposes that the applicant has applied for an exemption from water quality criteria applicable to human health. IP has not requested such an exemption and, therefore, this particular criterion appears to be inapplicable. Even if it were applicable, the evidence does not show that the effluent would cause a problem for potable water supplies or human health. 4. Contiguous Waters Florida Administrative Code Rule 62- 660.300(1)(a)6. requires a showing that "the exemption will not interfere with the designated uses of contiguous waters." Contiguous waters, for the purpose of this criterion, would be Elevenmile Creek, Perdido Bay, and the Perdido River. Petitioners argue that Tee and Wicker Lakes should be considered contiguous waters for the purpose of this criterion of the exemption rule. However, Tee and Wicker Lakes are within the exempted wetland tract so they are not contiguous waters. Petitioners contend that IP failed to account for the buildup of detritus in the wetlands and its eventual export to Perdido Bay. Their contention is based primarily on the opinion of Dr. Kevin White, a civil engineer, that treatment wetlands must be scraped or burned to remove plant buildup. However, Dr. Nutter explained that periodic removal of plant material is needed for the relatively small "constructed wetland" treatment systems that Dr. White is familiar with, but should not be needed in the 1,464-acre wetland tract. Nevertheless, because IP did not provide reasonable assurances that the proposed permit and related authorizations would not significantly degrade the Perdido River OFW, IP failed to meet this particular exemption criterion regarding interference with contiguous waters. 5. Scientifically Valid Experimental Controls Florida Administrative Code Rule 62- 660.300(1)(a)6. requires a showing that "scientifically valid environmental controls are provided . . . to monitor the long-term effects and recycling efficiency." Petitioners' argument about this particular criterion was largely misplaced. The term "environmental controls" modifies the term "monitor" and connotes only that the experiment would be monitored in a manner that will generate reliable information about long-term effects and performance. For monitoring purposes, IP's proposed NSAI protocol is an innovative and comprehensive plan that complies with this exemption criterion. Petitioners' objections to the lack of sufficient information about Tee and Wicker Lakes is more appropriately an attack on the sufficiency of IP's showing that its discharge would not cause a significant adverse impact on the biological community within the wetland tract. That issue was discussed above. 6. Duration of the Exemption Petitioners argue that the exemption can not exceed five years in duration, but the time schedules established by the proposed Consent Order and proposed permit would allow the exemption to be in effect for nine years. The Department's exemption order states that the five years does not begin to run until IP begins to discharge effluent at D-003 into the wetland tract. The possibility that IP might seek to renew the exemption after five years does not make the exemption something other than a five-year exemption. The Department's action on the request to renew the exemption would be subject to public review and challenge by persons whose substantial interests are affected. The Waiver The proposed waiver order would excuse IP from compliance with the criteria in Florida Administrative Code Rule 62-660.300(1)(a)3. and 4., which require that public access and recreation be restricted in the area covered by the exemption for experimental use of wetlands. Without the waiver, the public would have to be excluded from Tee and Wicker Lakes. Section 120.542, Florida Statutes, requires a showing by the person seeking the waiver that the purpose of the underlying statute will be achieved by other means and the application of a rule would create a substantial hardship or would violate principles of fairness. Petitioners contend that IP failed to demonstrate substantial hardship. However, Petitioners do not want public access to Tee and Wicker Lakes restricted. The sole reason for their objection to the proposed waiver is apparently to thwart the issuance of the exemption. Section 120.542, Florida Statutes, defines "substantial hardship" as a demonstrated economic, technological, legal, or other type of hardship to the person requesting the waiver. In the proposed waiver order, the Department identifies IP's hardship as the possibility that denial of the waiver could result in denial of IP's NPDES permit and closure of the mill. The proposed waiver order then describes the number of jobs and other economic benefits of the mill that would be lost if the mill were closed. As discussed in the Conclusions of Law below, the Department's interpretation of Section 120.542, Florida Statutes, to accept a demonstration of hardship that is associated with denial of the waiver is mistaken. The statute requires that the hardship arise from the application of the rule. In this case, IP must demonstrate that it would suffer substantial hardship if it were required to restrict public access and recreation on Tee and Wicker Lakes. Petitioners claimed that IP has no authority to restrict the public from gaining access to Tee and Wicker Lakes because those are public waterbodies which the public has a right to enter and use. A substantial legal hardship for IP in complying with the exemption rule, therefore, is that compliance is impossible. The Consent Order 1. Compliance Schedule Subsections 403.088(2)(d) and (e), Florida Statutes, provide that no permit shall be issued unless a reasonable schedule for constructing, installing, or placing into operation of an approved pollution abatement facility or alternative waste disposal system is in place. Petitioners claim the time schedules for compliance are not reasonable. Petitioners presented no competent evidence, however, that the WWTP upgrades, pipeline construction, and other activities required by the proposed permit can be accomplished in a shorter period of time. One recurring theme in the Petitioners' case was that the adverse impacts associated with the continued discharge to Elevenmile Creek should not be allowed to continue, even for an interim period associated with construction of the WWTP upgrades and effluent pipeline. However, Petitioners also advocated the relocation of the discharge to the Escambia River, or to a "constructed wetlands." Both of these alternatives would have required a transition period during which the discharge to Elevenmile Creek would likely have continued. Furthermore, the Consent Order imposes interim limits on the discharge to Elevenmile Creek that would apply immediately upon issuance of the proposed permit. Although altered by the mill's effluent discharge, Elevenmile Creek is now a relatively stable biological system. The proposed permit would effectuate some improvement in the creek and Perdido Bay even during the construction phase. 2. Contingency Plan The proposed Consent Order includes a contingency plan in the event that the NSAI monitoring analysis shows adverse impacts to the biological community within the wetland tract. The plan provides for alternative responses including relocating all or part of the wetland discharge to Elevenmile Creek. Petitioners object to the plan, primarily because they contend it is vague. The provisions in the contingency plan for relocating all or part of the discharge from the wetland tract to Elevenmile Creek, appear to reflect a presumption that the negatives associated with continued discharge to the wetlands would outweigh the negatives associated with returning the discharge to Elevenmile Creek. However, it is not difficult to imagine scenarios where the harm to the biological community of the wetland tract is small in relationship to the harm to the biological community that might have reestablished itself in Elevenmile Creek. Because the selection of an alternative under the contingency plan requires the consideration of data and analyses associated with future events, it is impossible to know at this time whether future action taken by the Department and IP pursuant to the contingency plan would be reasonable. If the contingency plan is intended by the Department and IP to authorize future action when circumstances described in the plan are present, then the plan is too vague. On the other hand, there is adequate detail in the plan if the purpose of the plan is merely to establish a framework for future decision-making that would be subject to permit modification, public review and challenge. Clarification is needed. 2. Penalties Petitioners complained that the stipulated of $500 per day for violations of the proposed Consent Order is too small to provide a deterrent to a company of the size of IP. Petitioners are correct, but did not present evidence to show what size penalty would be appropriate.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Department of Environmental Protection enter a final order: Denying proposed revised NPDES Permit Number FL0002526- 001/001-IW1S; Disapproving revised Consent Order Number 04-1202; Denying IP's petition for authorization for the experimental use of wetlands; and Denying IP's petition for waiver. DONE AND ENTERED this 11th day of May, 2007, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 2007.

Florida Laws (5) 120.542120.569120.57403.088403.0885
# 9
WILLIAM E. AND MARIE M. JACKSON vs. GEORGE M. THREADGILL AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-001576 (1982)
Division of Administrative Hearings, Florida Number: 82-001576 Latest Update: Feb. 28, 1983

Findings Of Fact Respondent, George M. Threadgill, applied on May 5, 1982, for a dredge and fill permit under Chapter 403, Florida Statutes, and Chapter 17-4, Florida Administrative Code. The application was for an extension to an existing pier which would be approximately 100 feet long by 4 feet wide with a platform on the end which would be approximately 10 feet long by 14 feet wide. On May 11, 1982, Respondent modified the application by adjusting the angle of the pier extension so it would not extend in front of his neighbor's property. The site of the project was to be on Innerarity Point on Perdido Bay, Escambia County. The existing pier is approximately 90 to 100 feet long. Prior to Hurricane Frederick in September, 1979, the existing pier extended an additional 40 feet into Perdido Bay. The Department of Environmental Regulation is an agency of the State of Florida with jurisdiction under Chapters 403 and 253, Florida Statutes, to regulate and require a permit for the construction of stationary installations within waters of the State. The Department also has permitting jurisdiction over dredge and fill operations in such waters pursuant to Florida Administrative Code Rules 17-4.28(2) and 4.29(1). The water at the project site is extremely shallow. Witnesses O'Neil and George Threadgill established that the water at the end of the existing pier ranges in depth from being dry in the winter to approximately 2 feet 6 inches during normal water levels. At the end of the proposed pier, the water is from 2 feet 9 inches deep to "waist deep" during normal water levels. There are no grass beds or other areas of significant marine vegetation in the area of the project. Expert witness Snowdon demonstrated that the bay bottom in the area consists of various grades of sand. There are no lagoons or inlets on the adjacent shoreline, and there are no navigational channels in the vicinity of the Project area. The construction of the pier extension is not expected to interfere wish wildlife in the area. There will be some amount of turbidity introduced into the water column as a result of placing the pier pilings in the water. Coarse sand of the type found in the area will settle rapidly out of the water column. Significant water quality problems would only be encountered if pockets of sediment are encountered while "jetting" the pilings into the substrate. The use of turbidity control measures will alleviate water quality problems associated with construction. Based on unrefuted expert testimony of witnesses Snowdon and Fancher, no water quality degradation will occur during and after construction of the pier. The majority of boat traffic in the area consists of mullet fishermen. The mullet boats navigate in the project area, but, as even Petitioners admit, they generally run either around or waterward of an iron stake located approximately 500 feet from shore. When the mullet boats do come within the project site, it is merely to pass through. They do not set their mullet nets within the project area. The existence of the pier will not significantly interfere with navigational patterns for commercial and private fishermen, nor for other types of marine craft or purposes. A sandbar approximately 20 to 25 feet wide exists along the shoreline beginning approximately 10 feet in front of the applicant's existing pier. Prior to September, 1979, the existing pier extended past the sandbar. There was no evidence presented that the pier blocked access or navigation at that time. The Petitioners do not object to the pier being rebuilt to its pre-1979 dimensions, nor to an area beyond the sandbar. At normal or high tide, Petitioners are able to run their boat straight out into Perdido Bay from a distance of 60 feet from the shore due to their having a "short shank motor" on their boat. The existence of the pier across the sandbar will not significantly interfere with the Petitioners' access to their pier or their waterfront. The existence of the pier will not affect navigational patterns of other neighbors. Paddleboats use the waters in the vicinity of the project area. Paddleboats can navigate under the adjacent pier owned by the Petitioners. The adjacent pier is approximately 5 feet high as measured from the top of the pier to the sand bottom. The proposed pier will measure slightly less than 6 feet from the top to the sand bottom. The existence of the proposed pier extension was thus shown to not significantly disrupt recreational paddleboat navigation in the area.

Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence in the record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore, RECOMMENDED that the application for a dredge and fill permit by George M. Threadgill for the construction of an extension to his existing pier on Innerarity Point in Perdido Bay in Escambia County, Florida, be GRANTED and that the necessary permit be issued. DONE and ENTERED this 14th day of January, 1983, in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of January, 1983. COPIES FURNISHED: William E. and Marie M. Jackson Route 1, Box 826 Pensacola, Florida 32507 Mr. George M. Threadgill 4626 LeHavre Way Pensacola, Florida 32505 E. Gary Early, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Ms. Victoria Tschinkel Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (3) 120.57253.12403.087
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer