The Issue The issue in this case is whether Respondents Paul Crum, Sr., and Paul Crum, Jr. (the "Crums"), are entitled to the Noticed General Permit issued by the Department of Environmental Protection ("Department") for the construction of a single- family residential dock and associated structures.
Findings Of Fact Background The Crums are the owners of the riparian property located at 15696 Shark Road West, Jacksonville, Florida. The Crum property is adjacent to Pumpkin Hill Creek, which lies within the Nassau River-St. Johns River Marshes Aquatic Preserve. Extending from the Crum property into Pumpkin Hill Creek is an existing wood dock approximately 90 feet long and four feet wide, with a platform near the landward end of the dock. Petitioner Brooks owns the property immediately adjacent to and north of the Crum property. Petitioner Brooks has a dock and boat lift. Petitioner Cole owns the property immediately adjacent to and southeast of the Crum property. The Cole property is located on a salt marsh and has no dock. Petitioner Jones lives approximately 3,200 feet north of the Crum property, on a tributary to Pumpkin Hill Creek. Petitioner Jones has fished Pumpkin Hill Creek and the surrounding waters for over 25 years. Noticed General Permits are a type of environmental resource permit granted by rule for those activities which have been determined to have minimal impacts to water resources. Florida Administrative Code Rule 62-341.427 grants by rule a general permit to construct a single family pier, along with boat lifts and terminal platforms, provided certain specific criteria are met. In August 2005, the Crums applied for a Noticed General Permit to extend their existing dock into deeper water. The Department issued a Notice of Determination of Qualification for Noticed General Permit, but later rescinded the authorization after Petitioner Brooks complained to the Department that the landward end of the existing dock is located only 21 feet from her property boundary and, therefore, did not comply with Florida Administrative Code Rule 18-21.004(3)(d), which requires that a dock be set back a minimum of 25 feet "inside the applicant's riparian rights lines." In November 2005, the Crums re-applied for a Noticed General Permit. Their revised plans called for removal of the existing dock and construction of a new dock extending approximately 255 feet out into Pumpkin Hill Creek. The proposed dock would be located a minimum of 25 feet inside the Crums' riparian rights lines. On December 6, 2005, the Department issued a Notice of Determination of Qualification for a Noticed General Permit for the revised dock, stating that the project satisfied the requirements of Florida Administrative Code Rule 62-341.427, as well as the conditions for authorization to perform activities on state-owned submerged lands set forth in Florida Administrative Code Rule 18-21 and for activities in an aquatic preserve under Florida Administrative Code Rule 18-20. In April 2006, Petitioners filed three petitions for hearing with the Department alleging that the proposed dock significantly impedes navigation by restricting access to a tidal creek and extends more waterward than necessary to access a water depth of (minus) -4 feet at mean low water, which is prohibited for docks in aquatic preserves under Florida Administrative Code Rule 18-20.005(3)(b)3. Petitioners attached to their petitions a copy of a bathymetric survey showing the elevations of the submerged lands in the vicinity of the proposed project. In response to the information contained in the survey, the Crums revised their plans to shorten the dock to its currently proposed length of 186.56 feet. A new Notice of Determination of Qualification for a Notice General Permit was then issued by the Department on October 16, 2006. The final dock project consists of: (a) removal of the existing wood dock; (b) construction of a four-foot wide, 186.56-foot long, single family residential dock consisting of an access pier, a 12-foot by 12-foot terminal platform, and a 14-foot by 20-foot open boat lift with catwalk (the “proposed dock”). The proposed dock will terminate where the water will be four feet deep at mean low water. Navigating in and Near the Tidal Creek To the south of the Crum property is a wide expanse of salt marsh. Within the salt marsh are unnamed tidal creeks. The mouth of one tidal creek that flows to Pumpkin Hill Creek is located approximately 90 feet south of the existing Crum dock. The tidal creek is shallow and is not navigable at or near low tide. Petitioner Jones owns an 18-foot flatboat which he sometimes keeps at his residence and sometimes at Petitioner Brooks' property. The boat draws about one foot of water. Petitioner Jones uses this boat to fish in the tidal creek located near the Crum property about ten times every month. No evidence was presented to show that Petitioner Brooks or Petitioner Cole ever navigate in or otherwise use this tidal creek. There are many other tidal creeks located in the marshes associated with Pumpkin Hill Creek. Petitioner Jones boats and fishes in most of them. Petitioner Jones said that, currently, he must wait two hours past low tide for the water depth to be sufficient for him to get into the tidal creek near the Crum property. His usual course to the creek lies just beyond the end of the existing Crum dock. He claims there is a channel there, but no channel is shown on the survey or in any of the parties' photographs. After the proposed dock is constructed, Petitioner Jones' usual course to the tidal will be obstructed. He contends that the new course he would have to take to the tidal creek will take him across shallower areas of Pumpkin Hill Creek so that he will have to wait two more hours (a total of four hours) after low tide to get into the creek. Therefore, Petitioner Jones' alleged injury is the reduction of the hours available to him to navigate in and out of the tidal creek for fishing. The existing Crum dock terminates on a broad mud flat which is exposed at mean low water. However, the bathymetric survey shows the mud flat is at a lower elevation near the end of the dock so water covers this area before it covers the rest of the mud flat. However, the bathymetric survey also shows the elevation of the bottom rising as one moves south from the existing dock. At the mouth of the tidal creek the elevation is 1.0 feet NGVD (National Geodetic Vertical Datum, an official, surveyed reference point). Because the tidal creek drains into the main body of Pumpkin Hill Creek, a reasonable inference can be made that the bottom elevations in the creek generally become higher (and the water depths decrease) as one moves up the creek toward dry land. Prop scars in the exposed bottom at the end of the existing dock indicate that boats have traveled over this area when the water was so shallow that the engine props were striking the bottom. Prop scarring can cause turbidity and damage to benthic organisms. The bathymetric survey indicates that mean high water in this area of Pumpkin Hill Creek is 3.03 feet NGVD, and the mean low water is -1.78 feet NGVD. The mean tidal fluctuation between mean low water and mean high water is thus 4.81 feet. Randall Armstrong, who was accepted as an expert in navigation and piloting, explained that in this area, where there are two daily tides, the water elevation will generally increase by 1/12 of the mean tidal fluctuation in the first hour after mean low water, another 2/12 of the fluctuation in the second, and 3/12 in the third hour. Applying this general rule to the tidal fluctuation here of 4.81 feet results in an estimated 1.2-foot increase in water elevation two hours after low tide and a 2.4-foot increase three hours after low tide. Based on the mean low water elevation of -1.78 feet NGVD, the water elevation would usually be about -0.6 foot NGVD two hours after low tide and 0.6 foot NGVD three hours after low tide. Therefore, the tidal creek (with a bottom elevation of 1.0 foot NGVD at the mouth) would usually be "dry" two hours after low tide and would usually have less than a foot of water three hours after low tide. That evidence contradicts Petitioner Jones' statement that he now navigates into the tidal creek two hours after low tide. That might occasionally be possible, but the bathymetric survey indicates the creek would usually be too shallow at that time. In fact, the evidence suggests that the tidal creek is only reliably navigable without causing prop scars to the bottom by using boats with very shallow draft and waiting until high tide (or shortly before or after) when the water depth at the mouth of the creek would be about two feet. It was Mr. Armstrong's opinion that the 1.0-foot NGVD elevation at the mouth of the tidal creek determines when and how long the tidal creek is navigable, and those times would not be affected by the proposed dock. He described the new course that a boater would use to navigate into the tidal creek after the proposed dock is built. He used the bathymetric survey to show that when the water is deep enough to navigate into the tidal creek, the water depth is also sufficient to navigate the new course. The proposed dock might, as Petitioner Jones alleges, cause boaters to traverse a longer section of the mudflat then they do currently. However, the more persuasive testimony supports the Crums' position that the navigability of the tidal creek is controlled by its shallowest point at the 1.0-foot NGVD elevation and that the proposed dock will not interfere with navigation of the tidal creek by requiring boaters to traverse shallower areas. Petitioner Jones testified that he regularly navigates his boat close to the existing Crum dock. The evidence does not indicate that the proposed dock would cause an unreasonable risk of collision for boaters using the new course to the tidal creek.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Secretary of the Florida Department of Environmental Protection enter a final order that grants Noticed General Permit No. 16-253057-002-EG to the Crums. DONE AND ENTERED this 22nd day of December, 2006, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 22nd day of December, 2006.
The Issue Whether Southern Hy Power Corporation (Hy Power) has provided reasonable assurance, based on plans, test results, or other information, that its proposed hydroelectric facility will comply with the Management and Storage of Surface Water (MSSW) statutes and rules of Southwest Florida Water Management District (SWFWMD) and the Wetland Resource Management permit (WRM)/water quality certification statutes and rules of the Florida Department of Environmental Protection (DEP).
Findings Of Fact By Joint Prehearing Stipulation the parties agreed to the following description of the parties and the project: PARTIES: The Department of Environmental Protection (the Department) is a government agency in the State of Florida existing by virtue of Section 20.255, Florida Statutes, and operating pursuant to Chapters 253, 373, 376, and 403, Florida Statutes, and Title 62, Florida Administrative Code. Under an interagency agreement with SWFWMD, the Department also implements Title 40D, Florida Administrative Code. The Department is located in Tallahassee, Florida, and it has a district office in Tampa, Florida, which district includes Levy County. Southern Hy Power Corporation is a Florida Corporation whose principal offices are located at 7008 Southwest 30th Way in Gainesville, Florida. Betty Berger is an interested party with a mailing address of Post Office Box 83, Inglis, Florida. The Campbells are an interested party with a mailing address of 245 Palm Street, Inglis, Florida. Hy Power applied on August 31, 1993, to the Department for a WRM permit/water quality certification to construct a hydroelectric facility on the Inglis By-Pass Channel. The project is located in Section 12, Township 17 South, Range 16 East, within the town of Inglis in Levy County. The facility consists of a powerhouse located on the south side of the channel measuring about 28 feet wide by 115 feet long, drawing water from the Inglis By-Pass Channel, passing it through a single-pit type turbine and discharging downstream of the Inglis By-Pass Spillway Dam. Hy Power applied on August 4, 1998, to the Department for a MSSW permit for the same proposed hydroelectric facility on the Inglis By-Pass Channel. DESCRIPTION OF PROPOSED PROJECT The project involves the construction of an intake structure, powerhouse, and tailrace on a 0.61-acre area located on the south side of the existing Inglis By-Pass Spillway. The facility will take advantage of the existing hydrostatic head that exists on either side of the Spillway Dam, to generate electricity. The powerhouse will be constructed below grade and will contain a single megawatt turbine and generating unit. The intake structure will divert flows from the upstream side of the Spillway Dam through the powerhouse and back into the By-Pass Channel. A small one-story control building and low profile substation will be constructed above grade within the boundaries of the project area. The hydroelectric project is considered to be a "Run of the River" type of facility because it can only use that water which flows down the existing channel. The geometry of the channel restricts flow to a certain amount, therefore the project cannot create or use flows above those that the By-Pass Channel can provide. The overall authority for control of water levels in Lake Rousseau and flow to the lower Withlacoochee River will remain with the DEP. Lake Rousseau was created in 1909 when the Inglis Dam was constructed across the Withlachoochee River for the purposes of hydroelectric generation. The dam impounds over 11 miles of the Withlachoochee River and forms a lake approximately 3,000 to 4,000 acres in size. Prior to construction of the Barge Canal, water released from the Inglis Dam would flow down the lower portion of the Withlachoochee River about 10 miles before entering into the Gulf of Mexico. In the mid to late 1960's the Army Corps of Engineers (ACOE) built a portion of the Cross Florida Barge Canal between the Gulf of Mexico and Lake Rousseau. The canal severed the Withlachoochee River downstream of the Inglis Dam causing its flow to be diverted into the Barge Canal and then into the Gulf. In order to maintain the flow of freshwater from Lake Rousseau to the lower segment of the River, the 8,900-foot long Inglis By- Pass Channel and Spillway were constructed. The resulting downstream flow ensures navigation in the lower portion of the River and sustains its freshwater and estuarine environment. The water level in Lake Rousseau is generally maintained at an elevation of 27.5 feet above mean sea level (msl) by a combination of the Inglis Dam, the Inglis Lock, which is located in the Barge Canal, and the By-Pass Channel Spillway. These water control features are known collectively as the Inglis Project Works. The water levels in the lower Withlachoochee River immediately to the west of the By-Pass spillway are close to sea level. The resulting head provides the potential energy needed to drive the proposed generator turbine. Under normal conditions the majority of water released from Lake Rousseau flows over the Spillway Dam into the lower segment of the River. According to the DEP Office of Greenways and Trails (OGT), the maximum capacity of the existing By-Pass Channel Spillway is 1,540 cubic feet per second. The hydroelectric project will divert whatever flow is allowed around the existing spillway through the turbine and back into the channel. When the Cross Florida Barge Canal project was cancelled in the 1990's, the ACOE transferred ownership of the property to the State of Florida Board of Trustees, who in turn has leased the property to the DEP for use as the Cross Florida Greenbelt State Recreation and Conservation Area. Management of this property, the control of river flow and lake levels, and operation of the Inglis Project Works are exercised by the DEP's OGT. The OGT utilizes a document entitled "Water Control Plan for Inglis Project Works," dated September 1994, as a guide to operating the structures. The Water Control Plan is incorporated as part of the MSSW intent to issue. On or about April 25, 1995, the Governor and Cabinet, sitting as the Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), approved a request from Hy Power to sublease 0.61 acres of Greenway property at the project site for the purpose of providing electric power. The request was challenged by Berger and the Campbells, and resulted in an administrative hearing held on November 3, 1995. As a result of the hearing, Administrative Law Judge Larry Sartin entered a Recommended Order on July 12, 1996, that the Board enter an order approving execution by the DEP of the proposed sublease and dismissing the petition of Berger and the Campbells. The Recommended Order was approved by the Trustees in its entirety in a Final Order dated April 12, 1996 ("Final Order"). Berger v. Southern Hy Power Corporation et al., Case No. 95-3589. A copy of the Final Order is listed as an exhibit to this Stipulation, and the Findings of Fact and Conclusions of Law contained therein are adopted herein. As previously ruled by the undersigned, the previous Final Order is res judicata as to Petitioners in this case, who are collaterally estopped from challenging any of the findings of fact or conclusions of law contained in the previous Final Order. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Final Order with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the Findings of Fact or Conclusions of Law in the Final Order. On February 21, 1995, Hy Power filed application with the Federal Energy Regulatory Commission (FERC) for a conduit exemption from the licensing requirements of Part I of the Federal Powers Act (FPA) for the proposed project. Petitioners and various other persons filed protests with FERC in opposition to the project. On April 21, 1997, FERC issued an Order Granting Conduit Exemption, a copy of which is listed as an exhibit to this Stipulation. Petitioners in this case are collaterally estopped from challenging any of the findings or conclusions contained in that Order Granting Conduit Exemption. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Order Granting Conduit Exemption with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the findings or conclusions in the Order Granting Conduit Exemption. FACTS ADDUCED AT HEARING OUTLINE OF PROJECT The proposed project calls for the construction of a water retention structure along the existing By-Pass spillway, the excavation of a large hole in which the powerhouse and turbine would be constructed "in-the-dry" south of the existing dam, and a millrace below the proposed project to return the water back into the existing water course. Conflicting testimony was received regarding the facts surrounding the construction of the project. These included: whether the proposed project will touch the existing wing walls of the existing dam; whether the water retention structure is a coffer dam; whether the proposed water retention structure will safely retain the water; whether the powerhouse and turbine have sufficient negative buoyancy to stay in the ground; whether the proposed excavation will weaken the existing dam; and whether the de-watering of the excavation site will adversely impact ground and surface water. PROJECT DESIGN AND ENGINEERING Engineering for the project was directed by witness Richard A. Volkin, a professional engineer and president and CEO of Engineering Company, Inc., based in Canton, Massachusetts. Mr. Volkin has extensive national and international experience in the design, management, and operation of hydroelectric facilities. Other engineers in Mr. Volkin’s firm worked on the project under Mr. Volkin’s direct supervision, including John May, who became registered as a professional engineer in Florida in order to sign and seal the engineering drawings for the project, which he initially did around 1994. Mr. May became ill and retired in 1998. Because of the length of time the application process has taken and the fact that Mr. May retired, there was a time while the application was pending, when Hy Power's design team was without a registered Florida engineer. When this was brought to the attention of Hy Power, Hy Power substituted Steven Crockett for Mr. May as the Florida-registered professional engineer of record for the project. DEP routinely accepts an applicant’s changing its engineer of record during the course of permit application or construction. Mr. Crockett is a civil and structural engineer who has considerable experience in preparing dam structural designs. Mr. Crockett independently reviewed and evaluated the engineering drawings for the project. Mr. Crockett resealed the drawings by using his drawn seal and signing the plans because his embossed seal was not readily available and time was of the essence. Mr. Crockett has advised DEP that he is now engineer of record for the project, using the appropriate DEP forms. Mr. Volkin’s firm performed all of the studies required by the various agencies, including a geotechnical study of the area, a 50-year analysis of water flow in and out of the Lake Rousseau regime, and water quality evaluations of water in the By-Pass Channel. The ACOE performed deep hole borings of the soils (approximately 36-40 feet below sea level) in the area of the project site to determine soil stabilization conditions at the site when they were constructing the Inglis Project Works. The soil conditions found can reasonably be expected to be similar today. Mr. Volkin’s company also took its own eight-foot deep surface core samples. The purpose of those samples was to verify the ACOE data. The new core samples verified the original core samples. Mr. Volkin also reviewed the ACOE’s engineering drawings developed from construction of the Spillway Dam. These show that the dam is founded on limestone bedding that has been stabilized with concrete. The hydroelectric facility will be constructed adjacent to and south of the dam structure and adjacent to and north of the barge canal. The same type of limestone bedrock is found in the area of the proposed construction. The facility design includes an intake channel on the upstream channel and a tailrace downstream. Those are the only structures that will be constructed next to the By-Pass Channel. The construction of the facility itself will be "in the dry." Hy Power will use coffer dams to seal off the construction site from the By-Pass Channel, so that there will not be water leakage from the Channel into the construction site. Water from the By-Pass Channel will enter the power plant when the coffer dams are lifted and the water is allowed to flow into the facility. The Petitioners presented the testimony of Bill Edwards, an individual with considerable experience in the construction of bridges, cofferdams, and similar concrete structures in aquatic and semi-aquatic conditions. Mr. Edwards is a former hard-hat diver who worked all over the world and worked in Florida for many years prior to his retirement. Based upon his experience and expertise in construction related to projects of this type, his testimony is credible and worthy of consideration. Mr. Edwards pointed out that if the proposed water retention structure did not touch the wing wall of the existing dam, it could not keep the water out and would not have the strength that it needed to retain the water. Hy Power’s witnesses explained that the retention structure would be set close enough to the existing wing wall that waterproofing materials could be placed between the two structures to keep the water out. Further, that the existing plans did not show interior bracing which would be included for structural strength and integrity. In sum, the retention structure will be in contact with existing dam’s wing wall, but will be free standing and not dependent upon the strength of the wing wall for its strength. Mr. Edwards pointed out that a cofferdam by definition has walls on all sides of the structure. The structure proposed by Hy Power did not have walls all the way around the proposed excavation. In rebuttal, Hy Power presented evidence that its plans were conceptual, design drawing and not construction plans. Hy Power represented that in actuality it would put as many walls as were necessary to keep the water out of the hole it intended to excavate. Trash racks will be constructed at the intake structures to protect aquatic life and make sure that trash and vegetation do not enter the intake structure or go down river. The trash rack bars will be two inches on center, which the U.S. Fish and Wildlife Service has determined as the appropriate size for the protection of fish. The turbine blades are "double regulated," and operate generally between 60 and 90 revolutions per minute. The design enables the turbine to operate at a constant speed to generate a consistent flow of electricity, notwithstanding the fact that the flow of the water may vary. The blade speed is not very fast, and the 2.5-meter blades provide a two to three-foot opening. This design acts to prevent fish mortality. There are four ways to shut off the flow of water through the proposed structure: close the pitch of the blades, close the wicket gates, allow the counter balance to the wicket gates to kick in and automatically close the gates, and close off the main gates. This is a fail safe system ("four level redundancy") designed to work upon any failure. Once water goes through the generator, its velocity is reduced to no greater than its intake rate which is a maximum of three feet per second. This prevents the water being discharged from the tailrace from causing erosion. If the head of water in the dam produces a flow exceeding three feet per second, it can be diverted over the other dams which will be functional. The power plant will be encased in concrete, except for a small access way that enables a person to go down a set of stairs to the plant. It will be a sealed, waterproof structure, as required by FERC and the ACOE. This will prevent penetration of groundwater, or flood waters in the event a massive flood overtops the plant. The only water entering the powerhouse will be through the turbine tunnel for power generation purposes. Mr. Edwards pointed out that the powerhouse was a closed structure and as such would have positive buoyancy, that is, it would float. Mr. Edwards pointed out that the proposed site is between the barge canal and By-Pass spillway and there is a great deal of groundwater and potentiometric pressure in the existing water table. In sum, there is a unlimited supply of groundwater at the site, and powerhouse could float out of the ground just like an empty swimming pool. Hy Power presented rebuttal evidence that the weight of the building, the turbine, and the water flowing through the turbine would be close to negative buoyancy, and they would add additional weight to the structure as necessary to keep it in place. The project is designed to generate three megawatts of electric power which is enough electricity to serve between 300 and 3000 homes, depending on usage. The project is designed to be unmanned. This is common for facilities such as this. The plant can be operated by remote control, unlike the existing controls at the By-Pass Dam, which are operated manually. DEP can access, monitor, and control remotely the generator's operation to include shutting the facility down at any time. There will be remote sensors to monitor water elevations. Flood protection will improve because of the ability of DEP to manage water flow from a remote location. If there is any major disruption, the plant will shut itself down. The project is classified as "green power." In other words, it generates natural energy without any disruption to the environment. The project will have minimal to no impact on the environment. There will be no significant changes in water quality compared to existing conditions as a result of either construction or operation of the facility. WRM Permit Criteria Hy Power has provided reasonable assurances that the proposed project will not cause a violation of state water quality standards of Section 403.918(a), Florida Statutes (1991). The parties stipulated that turbidity and dissolved oxygen were the two surface water quality issues of concern in this proceeding. The receiving water body is the Inglis By-Pass Channel. The Inglis By-Pass Channel is a Class III surface water. The project is not located in a OFW. While the lower Withlacoochee River is an OFW, the OFW designation runs up the natural river itself, and does not include the Spillway Dam, tailrace, or the remainder of the By-Pass Channel. There would be no degradation of water quality at the point of contact with the Withlacoochee River OFW. The DEP and FERC looked specifically at potential for turbidity and dissolved oxygen in determining whether the project would violate state water quality standards. The standards for turbidity and dissolved oxygen will not be violated. Because the By-Pass Dam is an under flow structure, a minimum of oxygenation currently occurs as water flows through the existing dam. The proposed project runs the water underground through the generator; however, Hy Power will measure the dissolved oxygen below the dam in the Lower Withlacoochee River. In the event there is any lowering of dissolved oxygen, Hy Power can install a "sparge ring" to reoxygenate the water going through the turbine so that dissolved oxygen remains at current levels. No turbidity will be added to the receiving water as a result of the project, because water velocity is low and the structure is encased in concrete and rip-rap. The only other potential for turbidity would occur when the coffer dams are removed after construction is complete. The coffer dams can be removed with the generator closed to permit any turbidity to settle. The amount of siltation that might occur when the generator is opened would be insignificant. Where a project is not in a OFW, an applicant must provide reasonable assurance that the project will not be contrary to public interest. See Section 403.918(2), Florida Statutes (1991). Hy Power has provided such assurances. The project will not directly affect public health, safety or welfare, or the property of others. See Section 403.918 (2)(a)1., Florida Statutes. There are concerns relating to the structural integrity of the proposed facility and adjacent structures which are discussed extensively below. The project will have no adverse impact upon the conservation of fish and wildlife, including threatened and endangered species and their habitat. See Section 403.918 (2)(a)2., Florida Statutes. While manatees are not likely to be found at the project site, the installation of the trash racks will eliminate any potential adverse impact on manatees. In fact, the racks will be an improvement over the current unprotected Spillway Dam. DEP procedures require a specific manatee control plan be implemented to deal with site specific concerns. The project will not adversely affect navigation or the flow of the water or cause harmful erosion or shoaling. See Section 403.918(2)(a)3., Florida Statutes. The project will not adversely affect fishing or recreation values or marine productivity in the vicinity of the project. See Section 403.918(2)(a)4., Florida Statutes. The permanent project and its construction will cause no significant environmental impacts. See Section 403.918(2)(a)5., Florida Statutes. There will be no adverse impacts to significant historical and archeological resources. Section 403.918(2)(a)6., Florida Statutes. With regard to the impact on current conditions and relative value of functions being performed by the areas affected by the proposed activity, there will be no negative impacts. See Section 403.918(2)(a)7., Florida Statutes. Improvement will result from better control of water flow at the project site, installation of trash racks and implementation of green power. THE FORESEEABLE ADVERSE SECONDARY OR CUMULATIVE IMPACTS Potential adverse secondary impacts related to power transmission are addressed through the fact that there is an existing power line corridor that can be used to transmit the electricity. Any need to change the corridor could be addressed by subsequent DEP permitting. Cumulative impacts are not at issue. Mr. Gammon, with Florida Power, acknowledged that the current electric company, presumably Florida Power, would be required by FERC to transport the electricity generated by Hy Power over its existing corridor and poles. No final decision has been made regarding how to access the site with equipment during construction. Several feasible construction options exist, and there are several ways of accessing the site with heavy equipment vehicles and without impacting wetlands. Any final decision would be subject to DEP approval. Since the project meets the public interest criteria of Section 403.918(2)(a), Florida Statutes, and wetland impacts are minimal, the project is permittable without the need for mitigation. See Section 403.918(2)(b), Florida Statutes. The ACOE has issued a permit for the facility. The permit varies slightly from the DEP intent to issue in the use of reinforced concrete rather than rip-rap on the bottom half of the intake channel. This is to comply with ACOE preference, but the variation has only an environmental benefit. Counsel for Petitioners sought to elicit testimony from Linda Sloan, Executive Director of the Withlacoochee Regional Planning Council, with regard to compliance of the proposed project with the Town of Inglis Comprehensive Plan and Land Development Code. Such compliance is not relevant to this proceeding. At any rate, Ms. Sloan conceded that any prohibition that might apply in the Land Development Code to construction of the proposed facility could potentially be alleviated by exemption or variance provisions in the Code. MSSW PERMIT CRITERIA The project will provide adequate flood protection and drainage in the conventional sense. See Rule 40D-4.301(1)(a), Florida Administrative Code. Because the amount of impervious area is minimal, runoff from the project will not in any way contribute to increased flooding or adversely impact drainage patterns. The total amount of impervious area of the facility is less than that of a single-family residence. SWFWMD rules do not even require MSSW permits for single-family residences because the impact is not significant. The only purpose for requiring a MSSW permit for the project is to review the project’s potential downstream impacts to the watershed, not stormwater runoff from the facility itself. The project will not cause adverse water quality or water quantity impacts on adjacent lands in violation of Chapter 373, Florida Statutes, or cause a discharge that violates state water quality standards. See Rule 40 D-4.301(1)(b), Florida Administrative Code. As indicated by the WRM water quality findings above, the project will not generally violate state surface water quality standards. See Rule 40 D-4.301(1)( c), Florida Administrative Code. The project will not generally cause adverse impact on surface or groundwater levels or flows. See Rule 40 D- 4.301(1)(d), Florida Administrative Code. Since the project is a run-of-the-river, it will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it under Chapter 40D-8, Florida Administrative Code. The project will not cause adverse environmental impacts, or adverse impacts to wetlands, fish, and wildlife or other natural resources. The project can be effectively operated and maintained. See Rule 40D-4.301(1)(g), Florida Administrative Code. The project is a slow speed, low maintenance facility. The design concept is well established and has been successfully used for many years. Possible adverse affects to public safety are discussed below. The project is consistent with the requirements of other public agencies. See Rule 40D-4.301(1)(i), Florida Administrative Code. Potential harm to water resources within the SWFWMD are discussed below. See Rule 40D-4.301(1)(j), Florida Administrative Code. The proposed project generally will not interfere with the legal rights of others. See Rule 40D-4.301(1)(k), Florida Administrative Code. The proposed project is not against public policy. See Rule 40D-4.301(1)(l), Florida Administrative Code. The project complies with the requirements contained in the Basis of Review. See Rule 40D-4.301(2), Florida Administrative Code. There is a dispute as to whether the project was within or at the edge of the 100-year flood plain. This dispute is related to how one interprets the rule as it relates to the millrace and the location of the facility which is under ground. In the conventional sense, the project is not in the flood plain. Further, the project is designed in such a way, that it is waterproof if it were topped with water. While in the past SWFWMD may have had concerns that the project might cause downstream flooding, SWFWMD currently has no such concerns, given the run-of-the-river status of the proposed project. The operation of the project will not cause downstream flooding. The DEP included in its intent to issue, conditions contained in the sublease between Hy Power and the DEP in order to ensure that the facility would remain run-of-the-river, would comply with the water control plan, and would otherwise comply with the terms of the sublease. The DEP has final control over water flow and can revoke the permit or otherwise take enforcement action against Hy Power if Hy Power fails to comply with the water control plan. GROUNDWATER IMPACTS Operation of the project will not cause groundwater contamination or otherwise have adverse groundwater impacts. Some concerns about groundwater during excavation of the construction site were raised. The conflicting evidence received regarding them is discussed below. An area of concern was the de-watering plan for the project. Everyone agrees there will be some water seepage into the construction site that will have to be pumped out. The parties disagree regarding the amount of water that will have to be removed. Their estimates of amount of water to be removed vary because their estimates of size and over-all depth of the site vary. Petitioners presented credible evidence that a potential exists for the construction site to have a large quantity of water because of its location between two sources of surface water (the By-Pass Channel and Barge Canal), because of the makeup of the subsurface, and because of the depth of the construction. Hy Power credibly represents that if excessive groundwater is found, it can address the adverse impacts through its de-watering plan that would have to be filed with FERC and DEP. The technology exists to address the de-watering of the project. Such plans are routinely considered by DEP after a construction permit is issued and before de-watering occurs. There is very little evidence of sinkhole activity in the project area, and the construction activities are not expected to cause any sinkhole activity. NOISE POLLUTION Mr. Bitter expressed concerns that FERC would require the facility to install a very loud siren that would result in sudden noise adverse to the well-being of neighbors. Mr. Bitter is unfamiliar with FERC siren requirements at run-of the-river hydroelectric facilities. In contrast, Mr. Volkin, who has substantial experience in this area, testified that the only alarm device that would be required would be for the protection of the workers during construction. The purpose of the alarm is to warn persons below a dam spillway of a change in the volume of water being let out of the impoundment. In the case of a run-of-the-river facility, the volume is near constant, changing only gradually. Therefore, even if a warning siren had to be installed its use would be limited to significant changes in flow or testing. This would not constitute a nuisance. Further, the facility is located in the vicinity of the Crystal River Nuclear Power Plant which has its own warning sirens. It would be prudent to make any warning devices required for this structure significantly different from those at the nuclear plant and to limit their use. DAM SAFETY AND FERC REVIEW In reviewing whether Hy Power’s applications complied with the relevant permitting criteria, the DEP took into consideration the review of the facility already performed by FERC. FERC will also be responsible for reviewing the project as it is being constructed. Mr. Edwards also raised concerns about the structural stability of the By-Pass Dam itself. This has been a subject of concern by those responsible for the dam, and a survey of the structure was conducted in 1993, referred to as the Greiner Report. The Greiner Report identified specific maintenance problems that have been and are being addressed by the DEP. However, DEP’s maintenance plan does not address specifically the possibility that the weight of the dam over time has caused some shifting in the dam. Hy Power has only a few core borings and only one at the location of the generator. Hy Power is using the ACOE’s original borings, as confirmed by several new ones, to develop its preliminary plans. The DEP considered FERC and the ACOE as responsible agencies for determining the structural integrity of the dam. DEP has taken FERC’s review of this facility into consideration as part of DEP’s own permitting review. It is normal for DEP to rely on outside sources and agencies for assistance in determining compliance with DEP permitting criteria such as public health and safety, and it is reasonable for DEP to do so in this instance. Most states do not have the full capability to evaluate dam safety, and so they rely on FERC and ACOE. On April 21, 1997, the project received a conduit exemption from FERC. The application process is illustrated in Hy Power Exhibit 11. Hy Power submitted to DEP detailed information about the dam, the associated structures and the proposed project which had been reviewed by FERC and the ACOE, the two agencies in the United States who are responsible for dam structure design, control, and administration. Included in the package was the Greiner Report and Hy Power’s review of it. FERC evaluated the project, the Inglis By-Pass Dam structure, and the proximity of the project to the Dam in relation to structural impact, upstream and downstream impacts, water quality, and environmental issues. Mr. Edwards raised concerns regarding the ability of the limestone bedrock to sustain additional construction in the area of proposed construction. This is a material issue in the controversy which impacts several aspects of the proposed construction. Mr. Edwards pointed out that the barge canal channel was constructed with the use of explosives that caused a fracturing of limestone bedrock. He pointed out that the steel panels, which Hy Power proposes to drive into the bedrock to construct the water retention structure necessary to excavate the hole into which the turbine and powerhouse would be placed, will further fracture this bedrock. This creates two potential dangers. It could permit water to move under and around the bottoms of the panels, potentially scouring the loosened material from the base of the panels and making them unstable and subject to failure. It could weaken the entire southern wing of the existing spillway dam. Mr. Edwards opined that this could result in catastrophic failure of the dam or the coffer dam. Such a failure would cause major destruction and loss of life to those persons living and working in and along the lower Withlacoochee River. Hy Power presented rebuttal evidence that it could and would, if necessary, inject concrete into the limestone to stabilize it and avoid the concerns raised by Mr. Edwards. FERC specifically evaluated concerns raised by project opponents over the poor physical condition of the By-Pass Channel Spillway structures, relying particularly on the 1993 Greiner Report. FERC noted that the DEP had entered into a contract to correct any deficiencies listed in the Greiner Report, which "did not conclude that the deficiencies at the By-Pass Spillway threaten downstream life and property." The FERC review concluded that the dam was safe. To ensure safety, FERC is requiring that Hy Power do a complete stability analysis of the dam prior to any construction. Articles 301 and 302 of the FERC exemption ensure that all final drawings and specifications be submitted to FERC prior to construction, along with a supporting design report consistent with FERC’s Engineering Guidelines; that FERC can require changes to assure a safe and adequate project; and that Hy Power must also submit approved coffer dam construction drawings and specifications at least 30 days prior to starting construction. FERC has its own engineering staff who will go to the site and do their own analysis, along with the ACOE, of the dam and structures, prior to any construction commencing. This is a detailed design review evaluation so that the latest information on the dam will be made known immediately prior to construction, and will prevent any catastrophic event from happening. Under FERC procedures, FERC requires the applicant to obtain the DEP permits prior to requiring applicant to submit more detailed construction designs for FERC's consideration. These more detailed designs in turn will be subject to further review by DEP and FERC. It is assumed that Hy Power will comply with the post- permitting procedures and requirements, and will present complete, detailed construction drawings for FREC and DEP approval. Hy Power’s failure to complete the process would result in denial of a construction permit.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the DEP enter a Final Order that issues the two permits challenged in this proceedings, WRM Permit No. 38-237096-3.001 and MSSW Permit No. 38-0129249-002, subject to the conditions contained in the Intents to Issue in the respective WRM and MSSW Permits and as described in the Recommended Order. DONE AND ENTERED this 2nd day of March, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2000. COPIES FURNISHED: Daniel H. Thompson, Esquire Berger Davis & Singerman 215 South Monroe Street, Suite 705 Tallahassee, Florida 32301 Andrew Zodrow, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John S. Clardy, III, Esquire Crider Law Firm Plantation Point 521 West Fort Island Trail, Suite A Crystal River, Florida 34429 Teri Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bernard M. Campbell Bessie H. Campbell 245 Palm Street Post Office Box 159 Inglis, Florida 34449 Sarah E. Berger Post Office Box 83 Inglis, Florida 34449
The Issue The issue to be determined is whether the applicants, William Guererro and Christina Bang, a/k/a Christina Guerrero (Applicants), are entitled to issuance of a Consolidated Environmental Resource Permit and State Lands Approvals for various structures on the Applicants’ property at 58458 Overseas Highway, Marathon, Florida.
Findings Of Fact The Parties Petitioners Bernard Spinrad and Marian Spinrad are the owners of adjoining parcels of property with the addresses of 58418 and 58420 Overseas Highway, Marathon, Florida. They acquired the property in December 2001. They recently completed construction of two residential structures on the properties. The structure at 58418 Overseas Highway is currently listed for sale. The structure at 58420 Overseas Highway is a vacation rental property. Neither structure is Petitioners’ permanent residence. The DEP is the state agency with the power and duty to regulate activities in waters of the state pursuant to chapter 373, Florida Statutes. The DEP also serves as staff to the Board of Trustees of the Internal Improvement Trust Fund (“Board of Trustees”) to review and act on activities on state sovereignty submerged lands under chapter 253. The Applicants, are the owners of adjoining parcels of property with the address of 58478 Overseas Highway, Marathon, Florida (the Property). They purchased the Property in June 2010. The structures that are the subject of the Permit are to be constructed near or waterward of the shoreline of the Property. The Property The Property is located on Grassy Key, an island in the middle Florida Keys, within limits of the city of Marathon, Monroe County, Florida. U.S. Highway 1 passes through Grassy Key. The Property -- as is that of Petitioners -- is situated between U.S. Highway 1 and the open waters of the Atlantic Ocean. In the early part of the 20th century, a portion of Grassy Key was platted as the Crains Subdivision. The properties owned by Applicants and Petitioners are within the Crains Subdivision. During the periods of time directly relevant hereto, the Property has been owned by Burgess Levine, who owned the property during the period prior to the October 2006, landfall of Hurricane Wilma until June 2010, and by Applicants, who have owned the Property since June, 2010. Grassy Key Grassy Key is three-miles long, and has 6800 feet of beaches, none of which are designated as critically eroded. The island fronts the Atlantic Ocean to the east, and the more protected waters of Florida Bay to the west. The waters along the Atlantic Ocean shoreline of Grassy Key in the area at issue are shallow, with an extremely flat bottom having a very gradual slope of approximately 1 to 30, meaning there is a one foot vertical change over 30 horizontal feet. The mean tide range at the Property is about 1.7 feet. Under normal conditions, the stretch of Grassy Key at issue is fairly characterized as a zero-wave energy shoreline. Waves break well offshore and there is negligible wave energy propagating beyond that point. What shoreline energy exists is produced by small tide currents and wind-shear on the water surface that moves water along the shoreline. The direction of the water movement is dependent on tides and wind direction, with the predominant direction being from north to south. Erosive and other significant changes to the shoreline of Grassy Key, including that stretch fronting the Property, are event driven, meaning when there is a coastal storm that causes a rise in the water level, substantially higher than the astronomical tide, waves can propagate onto the shoreline of Grassy Key. The wind and waves can come from virtually any direction depending on the storm. A storm of greater intensity will create higher energy-wave conditions. Although storm conditions may only occur over 1 to 3 percent of a given year, with the rest of the year having zero-wave energy, on average the coastline may be considered to be of moderate-wave energy. The beach sediment along the Grassy Key shoreline in all areas pertinent hereto consists of calcareous material, made up of the breakdown of corals and coralling algae, with a significant fraction of other detrital marine material. The upper beaches of Grassy Key, including that on the Property, generally consist of coarse, calcareous sand with a small fraction of calcareous silt-size particles. The inter-tidal areas along Grassy Key consist of predominantly fine calcareous sand, with a greater fraction of calcareous silt. Extending out into the nearshore area all along Grassy Key, including that fronting the properties owned by Petitioners and Applicants, the sediment becomes a very fine calcareous sand, with a greater fraction of the material being calcareous silts and clays, and with a substantial amount of organic mud of a marine origin, classified as Islamorada muck. Since at least the 1970s, one wading in the nearshore waters along Grassy Key could expect to sink into the surface muck to a depth of anywhere from six inches to two feet. The depth of muck becomes less as one moves further out and approaches the offshore Thalassia beds. Although some areas offer more resistance than others, it is routine to experience difficulty in walking and wading along the coast of Grassy Key because of the high percentage of clays and silts in the substrate. The band of muck narrows as one proceeds towards the northern stretches of Grassy Key, until one reaches the furthest areas to the northeast where the nearshore transitions to exposed rock and hard bottom. The surface muck that exists in the nearshore waters of Grassy Key, having a sizable component of decaying organic material, gives off an odor of hydrogen sulfide when disturbed that some find to be unpleasant. The odor is a naturally- occurring condition of the sediment, and is common in mucky areas all around the southern coasts of Florida. The suggestion that the shoreline in the vicinity of the Petitioners’ property, and that of Applicants, was a naturally occurring white, sandy beach is contrary to the greater weight of the evidence. To the extent the shoreline at Petitioners’ property may have been temporarily altered by the overwash from Hurricane Wilma as discussed herein, Petitioners’ own post-Wilma man-made efforts at beach stabilization, or the redistribution of sediments occasioned by Hurricanes Isaac and Sandy in 2012, the evidence demonstrates the “mucky” condition described herein to be more consistent with the natural and long-standing conditions of Grassy Key. Thus, as Grassy Key exists in the present time, one may expect to encounter six inches to two feet of loose muck anywhere along the nearshore area. Close to shore of Grassy Key are scattered beds of Halodule, a species of seagrass that tends to emerge and grow in shallow waters. The growth of Halodule is influenced by the nature of the sediments, the salinity temperature, and clarity of the water. Storm events have a significant effect on its growth. Given its transient nature, Halodule may vary in any given area from nonexistent, to spotty, to well-established beds. As one moves further offshore, the Halodule transitions to large, continuous beds of Thalassia. Thalassia grows in deeper water, and is common to a depth of about 12 feet. Being deeper and less affected by storm energy, the line of the Thalassia beds off of Grassy Key has not substantially changed over time. As wind and waves come across the grass beds, and as tides ebb and flow, grass blades are cropped. The amount of grass varies seasonally to a degree. The cropped and dislodged seagrasses, along with other organic material entrained therein, are naturally carried by the tides and wind and stranded along the shoreline. The stranded material is known as wrack, and the line of stranded material is known as the wrack line. Grassy Key is well known for the large seagrass wracks that pile up on the shoreline. A wrack line is a normal and natural occurrence in marine environments like that of Grassy Key, and can be a good indicator of the upper edge of the water action at a particular time. The cropping and dislodging of seagrass is accentuated during major or minor storm events. During Hurricane Rita in 2005, a very large seagrass wrack was blown onto the shoreline of Grassy Key. It was subsequently blown back out to sea by the overwash from Hurricane Wilma. The decomposition of the seagrass and other organic materials creates a significant odor that is not uncommon. That odor of decomposing material is well-recognized as being associated with Grassy Key. Areas along the shoreline of Grassy Key have been used by sea turtles for nesting. However, the nature of the substrate in the area of the Property is not optimal for nesting. Generally, sea turtles require a nesting site with 15 to 20 inches of sand above the water table so as to allow them to dig a suitably deep and dry cavity for their eggs. The natural substrate along the section of Grassy Key at issue is coarser and more difficult to dig into, and does not have the depth of sand for the best chance of a successful nest. Despite the nature of the substrate, Petitioner testified as to her observation of turtle nests along her property in each year from 2006 through 2010. Since the SW Groin, the Mid-bulkhead, and the NE Groin were all in existence and functioning during that period, with work to the SW Groin having been completed by 2008, the preponderance of the evidence demonstrates that those structures have no effect on the success or failure of sea turtles to nest along the property. To the extent nesting has been disrupted since 2011, the most logical inference that can be drawn from the evidence is that such disruption is the result of the Mid-Jetty Extension, which is slated for removal under the terms of the Permit. The preponderance of the evidence demonstrates that the structures and activities authorized by the Permit will have no adverse effect on sea turtles. Hurricane Wilma In October, 2005, Grassy Key was pounded by Hurricane Wilma. The storm passed to the north, and created a substantial storm surge that moved from west to east across Grassy Key. The storm surge created a “ridge and runnel” effect on the Atlantic facing shoreline, with the channelization of the storm tide flow creating erosion and gullies on upland shore-adjacent properties. The storm surge and flooding across Grassy Key caused substantial wash-outs of sand; transported a large volume of sandy, upland sediments into the nearshore waters of the Atlantic Ocean; and created washover “fans” of material along the shoreline of Grassy Key. The effects of the Hurricane Wilma storm surge manifested just north of the Property, became substantial at the Property, and continued south down the shoreline for a considerable distance. At the Property, sand was pushed from 50 to 100 feet waterward from the existing shoreline, and a substantial runout was created running parallel and north of the SW Jetty. The sand pushed into the water buried everything in its path, including seagrasses. In short, the post-Wilma shoreline from the Property south along Grassy Key was left in a completely disrupted state. The nearshore waters fronting the properties owned by Petitioners and Applicants were affected by the deposition of sandy, upland sediments, which temporarily created areas of substantially harder-packed sediment. Over time, as the shoreline equilibrated and the sandy sediment distributed through a broader area, more typical shoreline conditions returned. The photographic evidence demonstrates that the Mid- bulkhead and the SW jetty structures were impacted by the Hurricane Wilma storm surge. In addition, the sandy area between the mid-bulkhead and the SW jetty was pushed seaward from its previous location. The scars from Hurricane Wilma remain evident through the most recent aerial photographs received in evidence. It is visually apparent that seagrass, though reappearing in patches, has not reestablished in the nearshore areas along the affected shoreline of Grassy Key -- including the areas in front of the Property and the property owned by Petitioners -- to the extent that it existed prior to the storm. Post-Wilma Activities When Hurricane Wilma hit, the Property was owned by Burgess Lea Levine. Not long after Hurricane Wilma, Ms. Levine shored up the SW Jetty, and performed work in the “beach” area between the mid-bulkhead and the SW jetty. The photographic evidence also supports a finding that the rock outline of the Mid-jetty was reestablished to its pre-Wilma configuration. The repairs to the SW Jetty resulted in a structure that is virtually indistinguishable in size and shape to the SW Jetty as it presently exists. The wrack line at the beach area after it was “worked” following the passage of Wilma, shows the area in which work was done to be generally consistent with -- though slightly seaward of -- the 2005 post-Wilma shoreline. In 2008, Ms. Levine applied for a series of exemptions and for consent of use for state-owned lands for “shoreline repair, replace earthen ramp with a concrete ramp, repair wood deck, replace mooring piles & maintenance dredge existing channel w/in Atlantic Ocean.” On September 19, 2008, the DEP issued a regulatory authorization and proprietary submerged land approval. The Rights of Affected Parties that accompanied the September 19, 2008, notice provided that “[t]his letter acknowledges that the proposed activity is exempt from ERP permitting requirements” and that “this determination shall expire after one year.” The notice of Rights of Affected Parties did not apply to the proprietary authorization. At some time after issuance of the regulatory authorization, Ms. Burgess initiated additional work to repair the SW Jetty. The photographic evidence, which is persuasive, indicates that the work on the SW Jetty, including the concrete cap, was complete by the end of 2008. When Applicants purchased the Property, the determination of exemption issued in 2008 had, by application of the notice of Rights of Affected Parties, expired. Shortly after the Applicants purchased the property, they had the existing family home demolished. Applicants intend to construct a winter vacation home for their personal use on the property. 2012 Storms In August and October 2012, Grassy Key was subject to event-driven conditions as a result of the passage of Hurricanes Isaac and Sandy. Those storms redistributed large areas of sediments that had been moved offshore by the effects of Hurricane Wilma. The Proposed Permit The February 20, 2013, Permit provides that the structures described herein do not require the issuance of an Environmental Resource Permit, subject to the criteria and conditions in Florida Administrative Code Rule 40E-4.051. The Permit provides that the boat ramp is eligible to use the general permit in Florida Administrative Code Rule 62-330.417, the repair and replacement of the dock is exempt pursuant to section 403.813(1)(b), Florida Statutes, the maintenance dredging of the Channel is exempt pursuant to section 403.813(1)(f), and that the repair and replacement of the NW Jetty, the SW Jetty, and the Mid-bulkhead are exempt because the structures are “historic in nature and pre-dates Department regulations.” In addition to the regulatory authorizations, the Permit granted proprietary authorization by Letter of Consent for the dock pursuant to Florida Administrative Code Rule 18- 21.005(1)(c)4., and for the Channel, the NW Jetty, the SW Jetty, and the Mid-bulkhead pursuant to rule 18-21.005(1)(c)7. The Permit established the mean high-water line as that existing in 1974 and depicted on the “Richmond Survey.” Proprietary authorization for the boat ramp was determined to be unnecessary due to its location above the mean high-water line. Finally, proprietary authorization for the “Sandy Area” or beach between the Mid-bulkhead and SW Jetty was granted by Letter of Consent pursuant to rule 18-21.005(1). On September 20, 2013, the DEP filed a Notice of Additional Grounds for Exemption Determination, in which it found each of the structures subject to the regulatory review to “have only minimal or insignificant individual or cumulative adverse impacts on water resources” and to thus be exempt from the need to obtain an Environmental Resource Permit pursuant to section 373.406(6), Florida Statutes. On December 12, 2013, Applicants filed a Notice of Filing Proposed Changes to the Pending Agency Action in which they agreed to certain additional conditions, and which referenced the October 1, 2013, repeal of rule 40E-4.051, and its replacement by the “Statewide ERP rules.” For purposes of this de novo proceeding, the proposed Permit at issue includes the February 20, 2013, Permit; the September 20, 2013, Notice of Additional Grounds for Exemption Determination; and the December 12, 2013, Notice of Filing Proposed Changes to the Pending Agency Action. The Proposed Structures Groins There has been some confusion relating to the names of the structures that are subject to the proposed Permit. Two of the structures are referred to as jetties, the NE Jetty and the SW Jetty, and the middle structure is referred to as the Mid- bulkhead. A jetty is a navigation structure that is constructed at a barrier inlet. Its purpose is to stabilize the inlet and prevent shoaling by “jetting” current and wave-driven sand further offshore, such that the offshore bar is moved into deep enough water to allow navigation in and out of the tidal inlet, and allowing the tidal current between the ocean and the receiving body of water to keep the inlet scoured and open. There are 48 jetties on the open coast of Florida, none of which are in the Florida Keys. A groin is a structure designed for shore protection purposes. A groin is typically aligned perpendicular to the shoreline, or “shore normal.” The structures identified in the Permit as the NE Jetty and the SW Jetty are clearly groins, and not jetties. The mid-bulkhead is a groin, generally for shore confinement, with a channel-facing bulkhead. For purposes of continuity, the structures will be identified by the names given them in the Permit. Since there is negligible wave energy along the shoreline normal conditions, the groins have little or no day- to-day effect on longshore transport. Under storm conditions, the structures affect longshore transport, as evidenced by accretional “fillets,” and function as shoreline protection and confinement structures. The rock groins provide shelter, habitat and structure for corals, sponges, lobster, and fish in the area. The preponderance of the evidence demonstrates that the groins authorized by the Permit will have no adverse effect on fish and wildlife resources. NE Jetty The NE Jetty was originally constructed in the early 1960s, likely concurrent with the dredging of the navigational channel. The quality of the aerial photographs of the period make it difficult to tell if the NE Jetty was a loosely-placed rock embankment or a more well-designed and constructed structure. However, the fillet of sand accreted to the north of the Channel demonstrates that the jetty was in existence and functioning as a shore-protection structure. By the 1970s, the NE Jetty had become overwhelmed by longshore sediment transport from the northeast. Sediment overtopped the NE Jetty and filled in the landward reaches of the Channel. At that point, ability of the NE Jetty to perform as a shore protection structure was compromised to the point that it could no longer hold the shoreline out of the basin or the landward portion of the Channel. The Mid-bulkhead became the dominant structural control over the shoreline and started to accrete the shoreline to the northeast. At some time between 1977 and 1981, the Channel was maintenance dredged pursuant to a permit issued by the Department of Environmental Regulation, DEP’s predecessor agency. The NE Jetty appeared on the plans for the maintenance dredging. Thus, the most reasonable inference that can be drawn from the evidence is that the NE Jetty was repaired and restored in conjunction with the approved maintenance dredging. By 1981, the NE Jetty had been restored as the dominant shore protection structure north of the Channel, and a fillet of accreted material had been reestablished. The aerial photographs from that period are not sufficiently distinct to determine the precise size, shape, and configuration of the NE Jetty at that time. However, there is no evidence of additional work having been performed on the NE Jetty between 1981 and 1985. By 1985, the NE Jetty existed in substantially the size, shape, and configuration as it existed at the time of Hurricane Wilma. Between 1981 and the 2005 arrival of Hurricane Wilma, the evidence is convincing that the NE Jetty was holding up the shoreline to the northeast and preventing sediment from filling in the upper reaches of the Channel. Although the evidence suggests that the NE Jetty had, by 2005, begun to show its age, the continuous presence of an accretional fillet demonstrates that it continued to serve its function as a shore-protection structure. Although the NE Jetty suffered damage from Hurricane Wilma, it continued to perform its shoreline protection function. Aerial photographs taken in 2009 and 2011 show a relatively distinct structure with a well-defined accretional fillet. Thus, the greater weight of the evidence demonstrates that, at the time of its repair in May 2011, the NE Jetty was a functional groin. The NE Jetty, as repaired in 2011, is of substantially the same size, shape, and location as the structure depicted in aerial photographs taken in 1985, 2009, and early 2011. Although the elevation of the structure was increased over its pre-repair elevation, the increase was that reasonably necessary to prevent the function of the structure from being compromised by the effects of age and weather. The work performed on the NE Jetty, consisting of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Since 2005, and at the present time, the shoreline north of the NE Jetty has reached a state of equilibrium and stability, and is not expected to change significantly from its current condition. The preponderance of the competent, substantial evidence demonstrates that the effect of the NE Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. The sand and sediment accreted to the north of the NE Jetty since 1981 is in the range of 250 square feet. SW Jetty The aerial photographs from 19647/ demonstrate that some form of structure then existed at the location of the current SW Jetty. The structure is indistinct due to what appears to be sidecast material from a small channel in front of the property to the immediate south of the Property. By 1971, the SW Jetty had become more distinct. From that time forward, the SW Jetty, and its accompanying fillet of accreted material, appears in roughly the size and shape of the structure as it appeared immediately prior to the arrival of Hurricane Wilma. The SW Jetty was heavily impacted by Hurricane Wilma. The overwash from the storm created a substantial runout alongside the SW Jetty, and the post-storm aerials suggest that the jetty boulders were undermined and shifted from their more uniform 2003 appearance. Immediately after Hurricane Wilma, the owner of the Property commenced restoration and repair activities. As part of the activities, the SW Jetty was repaired with the addition of boulders, which were often three feet and every now and then as much as four feet across. The boulders, being irregularly shaped, could not be stacked like Legos®, so the repairs were not neatly within the precise pre-Wilma footprint. However, the repaired SW Jetty was substantially in the length and location as existed prior to Hurricane Wilma, though it may have had a slightly wider cross-section. By 2007, the work on the SW Jetty was complete, and it had assumed its present appearance with the addition of a concrete cap. Its appearance -- i.e. length, width, and location -- in 2007 and 2008 was not dissimilar from its appearance in 2003. As repaired, the SW Jetty effectively constitutes the same structure that it has been since its initial construction. From a coastal engineering perspective, the work that was performed on the SW Jetty, consisting generally of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Dr. Lin testified that between 1974 and 2011, the area to the southwest of the southwest jetty was “about equalized,” though it was “accreting a little bit.” Thus, the effect of the SW Jetty on the shoreline of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners from 1974 to 2011 was minimal and insignificant. Dr. Lin testified that, since 2011, the same area had eroded. The only substantive shoreline change that logically accounts for that subsequent erosion is the Mid-bulkhead extension, which is slated for removal under the terms of the proposed Permit. Petitioner testified that she observed no adverse effects from activities on the Property until after February 2011.8/ Since work on the SW Jetty was complete by no later than 2008, Petitioner’s testimony supports a finding that the SW Jetty has had no measurable effect on the water resources in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the SW Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. Mid-bulkhead The structure of the Mid-bulkhead first appeared as part of the sidecast material from the excavation of the navigation channel in 1964. It coalesced into a defined but smaller and more rudimentary structure in the 1971-1972 time period. At that time, it was acting as the predominant shore protection structure due to the overtopping of the NE Jetty with sediment, which also filled in the landward reaches of the Channel. By 1981, after the maintenance dredging of the Channel, the Mid-bulkhead had assumed substantially the size, shape, and location that it has currently. The Mid-bulkhead has a navigation function of protecting the landward extent of the Channel from the collapse of adjacent sand and sediment, and a shore protection and compartmentalization function. Those functions have been consistent since 1981. The Mid-bulkhead appears to have been subjected to the overwash of sand and sediment from Hurricane Wilma, though it maintained its shape and form. The outline of the Mid-bulkhead appears to be more well-defined after the initial post-Wilma repairs. In any event, the configuration and size of the Mid-bulkhead is substantially the same as it had been since 1981. At some point, the interior section of the Mid- bulkhead was topped with soil that is inconsistent with that naturally occurring in the area. That fill was confined, and brought the Mid-bulkhead to a more even grade with the rock outline, but could have had no measurable effect on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the Mid-bulkhead is minimal and insignificant. Channel In 1961, the Department of the Army authorized dredging of a navigation channel at the Property. The approved channel was to be 700 feet long, 30 feet wide, and to a depth of five feet below mean low water. The Florida Trustees of the Internal Improvement Fund issued a letter of no objection. By 1964, the Channel that is the subject of this proceeding had been dredged, though not to the 700-foot length approved. Rather, the Channel was dredged to a length of approximately 290 feet. Much, if not all of the dredge spoil was sidecast, creating a rock structure alongside the Channel. Measurements taken during the course of this proceeding demonstrate that the initial dredging resulted in near vertical side slopes, which shows that the bailing of the bedrock was accomplished to the limits. The width of the Channel is from 28 feet to 32 feet wide, which is within an acceptable tolerance of the 30-foot approved width. In 1976, the then-owner of the Property sought a permit from the DEP’s predecessor, the Department of Environmental Regulation, to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, to a depth of minus 8-feet mean high water, and to construct a new rock jetty to extend 230 feet waterward from the existing terminus of the NE Jetty. Given the mean tide range of 1.7 feet at the Property, the depth of the proposed dredging would have been minus 6.3 feet mean low water, or 1.3 feet deeper than originally approved. The permit drawings depict the existing NE Jetty, the Channel boundary, the outline of the Mid-bulkhead, and the sidecast rock structure alongside the southern side of the Channel. The permit was denied. In 1977, the owner of the property reapplied for a permit to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, and to a depth of minus 4.0 feet below mean low water nearshore to minus 6 feet below mean low water at the waterward end. The proposal to construct an extension of the NE Jetty was deleted. The permit was issued, and a severance fee for the dredged material was paid based on a projected 700 cubic yards of material removed. The permit drawings and photographs depict the existing NE Jetty, the nearshore Channel boundary, and the general outline of the Mid- bulkhead. By 1981, aerial photographs demonstrate that the maintenance dredging of the Channel was complete, the NE Jetty was in place and functioning to protect the shoreline as evidenced by the accretional fillet, and the Mid-bulkhead had assumed its approximate current shape and configuration. Although the Channel has varied in depth over the years since the maintenance dredging and Hurricane Wilma, the greater weight of the evidence, including photographic evidence, indicates that the Channel was well-defined and remained navigable during that period. The Channel is an open-water exposed channel. Water in the Channel mixes due to direct tidal flow and the sheet flow of water due to shear wind stress. As water passes over the Channel, it sets up gyre, which is a mixing process. The open- water exposed Channel is subject to a high degree of mixing, even on normal waveless conditions, because of the wind transport of water and the tidal transport of water. The Channel is not a semi-enclosed basin. A semi- enclosed basin does not receive the direct forcing functions that an open-water channel receives. A semi-enclosed basin has no direct connection to open waters, but is connected to open waters by a narrower opening. Although a semi-enclosed basin exchanges water via every tidal cycle, the flushing process is one of slow mixing, in which a little bit of water is added to and withdrawn from the larger basin through the narrow opening during each tidal cycle. In such a case, a flushing analysis may be necessary to determine how much time and how many tidal cycles it may take to effect a complete exchange of the water in the semi-enclosed basin, and thus, for example, to dilute a pollutant to an acceptable level. A flushing analysis is not needed in this case because the Channel is an open-water, openly-exposed location subject to a high degree of mixing under normal day-to-day tidal processes. There is no greater basin connected by a restricting connection as with a semi-enclosed basin. Rather, the Channel has direct exposure to the tides, along with wind shear stress moving the water. The evidence in this case is substantial and persuasive, because the Channel is highly exposed to the open water and the tides, and a well-mixed and well-flushed aquatic system, that a flushing analysis is neither required nor necessary. Dock The dock made its first obvious appearance in 1981. It appears in a consistent shape and appearance through 2011. Aerial photographs taken in 2012, after the maintenance dredging of the Channel was conducted, show the dock had been removed. At the time of the hearing, the Applicants had installed new pilings and vent boards for the replacement dock, but the decking had not been installed. Work to complete the replacement of the dock was halted due to the pendency of the litigation challenging the structures. The proposed dock is less than 500 square feet. It is proposed for non-commercial, recreational activities. It is the sole dock proposed on the Property. The proposed dock will not impede the flow of water or create a navigational hazard. Boat Ramp Since the issuance of the 2008 approval, the boat ramp site was graded and stabilized in limerock material. The concrete ramp was not completed due to the pendency of the litigation challenging the structures. However, Applicants propose to pave the ramp with concrete. Based on Mr. Clark’s observations during his site visits, the boat ramp is landward of the mean high waterline depicted on the survey. The preponderance of the evidence demonstrates that the proposed boat ramp will provide access to the Channel, which provides a minimum navigational access of two feet below mean low water to the ramp. Applicants have agreed to install depth indicators at the ramp to identify the controlling depths of the navigational access. The work on the ramp involves no seagrass beds or coral communities. The ramp as proposed will require no more than 100 cubic yards of dredging. The total width of the ramp is to be 20 feet and the ramp surface will be no wider than 12 feet. Beach Area The area between the SW Jetty and the Mid-bulkhead is an accreted beach-type area that has been confined and protected by the Mid-bulkhead and the SW Jetty. The shoreline landward of the mean high water line, from the dry beach and to the upland, is somewhat steeper than adjacent unprotected shorelines, which is indicative of the grooming of the upper beach sediment and the stability of the shoreline between the Mid-bulkhead and the SW Jetty. As a result of the Hurricane Wilma storm surge, a substantial amount of sediment was swept across the Property and into the Atlantic waters. The beach area was inundated with sand and sediment from the overwash, which appears to have moved the shoreline well waterward of its previous position. Along the northern side of the SW Jetty, a substantial channelized gully was created. The configuration of the shoreline post-Wilma suggests that efforts were made by the then-owner of the Property to fill in the gully on the northern side of the SW Jetty, and to groom and restore the shoreline by redistributing sand and sediment on the Property. It is typical, and allowable under DEP emergency final orders, for affected property owners to redistribute overwashed deposits and place them back within the beach system. In that regard, the DEP encourages the redistribution of clean beach sand back onto the beach. The then-owners of the Property were not alone in taking steps to address the effects of Hurricane Wilma on their adjacent shorelines. The photographic evidence demonstrates that Petitioners engaged in similar restorative activities, which included bringing in material purchased from a contractor to fill in a gully created on their property by the overwash. Observation of representative soil samples from the beach area demonstrate that the soils are consistent with those in the upper beach areas found throughout the area. The only areas of inconsistent soils were found in the interior of the rock structure of the Mid-bulkhead, which contained a four to six-inch layer of soil with a different consistency and darker brown color, and small area of similar soil directly adjacent thereto and well above the mean high water line. The greater weight of the competent, substantial, and credible evidence demonstrates that there was no substantial amount of “fill” from off-site placed on or adjacent to the beach area. Rather, the nature, appearance, and composition of the soils suggests that the temporary increase in the size of the beach area after Hurricane Wilma was the result of grooming and redistribution of sand and sediment pushed onto the Property and into the nearshore waters by the Hurricane Wilma storm surge. In the years since Hurricane Wilma, the influence of normal tidal and weather-driven events has returned the beach area between the mid-bulkhead and the SW jetty to roughly the configuration that existed prior to the passage of Wilma, though it remains somewhat waterward of its pre-Wilma location.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law set forth herein it is RECOMMENDED that the Department of Environmental Protection enter a final order approving the February 20, 2013, proposed Permit, as conditioned by Applicants’ December 12, 2013, Proposed Changes to the Pending Agency Action. DONE AND ENTERED this 25th day of July, 2014, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of July, 2014.
The Issue Has the applicant, Grove Isle, Ltd. provided reasonable assurances and affirmatively demonstrated that its proposed marina is clearly in the public interest and will not lower the existing ambient water quality of Biscayne Bay, a designated outstanding Florida water?
Findings Of Fact On March 13, 1978 an application was made to DER for a water quality control permit to construct a wet-slip marina on the west side of Grove Isle, formerly known as Fair Isle and Sailboat Key. The original plan for the marina, which was initially objected to by the Department of Environmental Regulation, was modified to protect a bed of seagrasses extending about 30 feet wide in a band along the west side of the island. While the plans were being modified and consultations with other government permitting agencies were in progress, the application was "deactivated" from September 27, 1978 until March 30, 1979. As a result of its investigation and review, DER on October 23, 1979, issued a letter of intent to grant the permit to Grove Isle, Inc. The permit if granted, would allow the applicant to construct six concrete fixed piers, five "T" shaped, one "L" shaped, with a boat docking capacity of 90 pleasure boats. The piers will extend a maximum of 165 feet offshore from an existing concrete bulkhead. The width of the piers will be 8 feet from the bulkhead to a point 41 feet offshore, and then increased to a width of 10 feet. A sewage pump-out facility is also proposed. Attached to that letter of intent were the following conditions: Adequate control shall be taken during the construction so that turbidity levels outside a 50 foot radius of the work area do not exceed 50 J.C.U's, as per Section 24-11, of the Metropolitan Dade County Code. During construction, turbidity samples shall be collected at a mid-depth twice daily at a point 50 feet up stream and at a point 50 feet down stream from the work area. The contractor shall arrange to have turbidity sample results reported to him within one hour of collection. Turbidity monitoring reports shall be submitted weekly to DER and to the Metropolitan Dade County Environmental Resources Management (MDCERM) If turbidity exceeds 50 J.C.U's beyond a 50 foot radius of the work area, turbidity curtains shall be placed around the work area and MDCERM notified immediately. Turbidity samples shall be collected according to condition two above, no later than one hour after the installation of the turbidity curtain. It turbidity levels do not drop below 50 J.C.U's within one hour of installation of the curtain all construction shall be halted. Construction shall not be resumed until the contractor has received authorization from MDCERM. No live-a-board vessels (permanent or transient) shall be docked at this facility unless direct sewage pump-out connections are provided at each live-a-board slip. A permanent pump-out station shall be installed and maintained for further removal of sewage and waste from the vessels using this facility. Compliance with this requirement will entail the applicant's contacting the Plan Review Section of MDCERM for details concerning connection to an approved disposal system. Boat traffic in the shallow 30 foot wide dense seagrass area which parallels the shoreline shall be restricted by the placement of wood piles on 6 foot centers along the entire shoreline facing the marina. The channel from this marina to deeper water in Biscayne Bay shall be marked to prevent boats from straying into adjacent shallow areas. This will prevent habitat destruction. A chemical monitoring program shall be established to determine the effect of this marina on the water quality of this section of Biscayne Bay. Surface and mid-depth samples shall be collected at three points in the project area and at one background station. Parameters shall include, but not be limited to dissolved oxygen, pH, salinity, temperature, total coliform and fecal coliform and fecal streptococci bacteria, oil and grease, biochemical oxygen demand, and turbidity. Background samples shall be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. In addition to the chemical monitoring program, a benthic community monitoring program is to be established. Samples of the benthic seagrass community within and adjacent to the project area are to be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. Should either monitoring program detect dissimilar changes at its monitoring and control stations, DER and MDCERM shall be notified of the results. The monitoring programs shall be reviewed and approved by DER and MDCERM prior to implementation. Monitoring reports shall be submitted to DER and MDCERM and the United States Corps of Engineers on regular basis. Warning signs shall be posted in the marina area to advise marina users that manatees frequent the area and caution should be taken to avoid collisions with them. With the foregoing conditions imposed, the Department concluded that no significant immediate or long term negative biological impact is anticipated and state water quality standards should not be violated as a result of the proposed construction. Grove Isle, Inc., has agreed to comply with all the conditions established by the DER letter of intent to grant the permit. Grove Isle is a spoil bank in Biscayne Bay located approximately 700 feet east of the Florida mainland. It is linked to the mainland by a two-lane concrete bridge. The island is currently under development for a 510 unit condominium community with associated facilities such as a restaurant, hotel, and the proposed marina. The island is surrounded by a concrete bulkhead constructed many years ago. No changes in the bulkhead line are proposed. Grove Isle, Inc., proposes constructing the marina on concrete piles driven into the Bay bottom from a shallow draft barge. During construction there would be some turbidity caused from the disruption of the Bay sediment. This can however be adequately controlled by the use of turbidity curtains during construction. The construction will not require any dredging or filling. In the immediate marina site the most significant biota are a 30 foot wide bed of seagrasses. There are no other important biota because at one time the area was extensively dredged to create the island. There are no oyster or clam beds nearby. While lobsters may have once frequented the area, they too are no longer present. The water depth in the area ranges from 1 foot near the island bulkhead to 12 feet offshore to the west of the island. This particular seagrass bed consist primarily of turtle grass (thalassia, testudinum) with some Cuban Shoal Weed (Halodule, Wrightii). Protection for these grasses will be provided by a buffer zone between the island and the boat slips. The grassy zone will be bordered by a row of dolphin piles to exclude boat traffic. Because the grass requires sunlight for photosynthesis and therefore life, the six piers will have grated walkways where they pass over the grass. This will allow sunlight to reach below. In addition to the small grass bed on the west of the island there are extensive beds to the northeast, east and south of the island that extend several hundred yards from the island in water depths of three to ten feet. If boat traffic in the vicinity is markedly increased due to the existence of the marina, it is conceivable that the number of propeller scars in these shallow beds could increase. At the present time the beds are already traversed by boats, some of which are owned by Petitioner's members. There are already for example, approximately 50 crafts which operate from the nearby mainland or from Pelican Canal directly to the north of the island. Propeller scars take up to fifteen years to heal yet the number of scars in the Grove Isle area is insignificant and even a tripling of them from an additional 90 boats would still be de minimus. Potential damage to the seagrasses on the north side of the island will be minimized by the planned installation of navigation markers by Grove Isle. These markers will channel boats into water of a navigable depth and lessen the number of groundings and near groundings which cause the scarring. There is evidence that pleasure boats by their very existence and operation in the water are potential pollution sources. For instance, various maintenance chemicals such as anti-fouling bottom paint and wood cleaner have the ability, if used in sufficient quantity, to harm marine life. The fueling of engines and sewage discharge from boats are additional pollution sources. There was however, no showing that the location of up to 90 pleasure and sport fishing craft at the proposed marina site would in any way cause a degradation of water quality below the acceptable standards for Class III waters. At the present time, the marina site has adequate flushing to disburse those pollutants which may be generated by the marina operations. While a hydrographic survey was not requested by DER or provided by Grove Isle at the time the permit application was made, the testimony of Dr. Echternacht at the time of the Hearing provided adequate assurances respecting the hydrographic characteristics of the proposed site. The proposed marina will have no fueling or maintenance facilities. No live-a-board craft will be allowed at the marina. Both Mr. Wm. Cleare Filer and David A. Doheny live close to Grove Isle. Mr. Doheny's residence is on the mainland facing the proposed marina site and Mr. Filer's house is on Pelican Canal. They use the waters of Biscayne Bay around Grove Isle for recreation. If the quality of the water in the proposed marina site were lessened their substantial interest would be affected. Biscayne Bay is classified as a Class III water and is in the Biscayne Bay Aquatic Preserve. Careful considerations has been given to each of the proposed findings of fact submitted by the parties. To the extent that they are not contained in this Order, they are rejected as being either not supported by competent evidence or as immaterial and irrelevant to the issues determined here.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a Final Order be entered by the State of Florida, Department of Environmental Regulation, determining that the requested water quality control permit and certification be issued subject to the conditions contained in the Notice of Intent to Issue Permit and that the Relief requested by the Petitioners be denied and their Petitions be dismissed. DONE and ENTERED this 22nd day of February, 1980, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: David A. Doheny, Esquire 1111 South Bayshore Drive Miami, Florida 33131 Wm. Cleare Filer 3095 Northwest 7th Street Miami, Florida 33125 Joel Jaffer 2479 Southwest 13th Street Miami, Florida 33145 Randall E. Denker, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Larry S. Stewart, Esquire Frates, Floyd, Pearson, Stewart, Richmond & Greer One Biscayne Tower 25th Floor Miami, Florida 33131 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION BAYSHORE HOMEOWNERS ASSOCIATION, INC., et al., Petitioner, vs. CASE NO. 79-2186 79-2324 STATE OF FLORIDA, 79-2354 DEPARTMENT OF ENVIRONMENTAL REGULATION, and GROVE ISLE, LIMITED, Respondent. /
The Issue The issue for determination is whether Petitioner's revocation of Respondent's modified permit, authorizing a cross- fence on Petitioner's fee owned right-of-way, should be approved.
Findings Of Fact The South Florida Water Management District (District) is a public corporation in the State of Florida, existing by virtue of Chapter 25270, Laws of Florida (1949), and operating pursuant to Chapter 373, Florida Statutes, and Title 40E, Florida Administrative Code, as a multi-purpose water management district. The District's principal office is West Palm Beach, Florida. In executing its multi-purpose, the District, as local sponsor for the US Army Corps of Engineers' Central and Southern Florida Flood Control Project, acquired canal rights-of-way. The District's rights-of-way were acquired to enable the Corps of Engineers to construct the flood control project and to maintain the system after its construction. The District operates a proprietary-based right-of-way program to manage the various property interests of the canal rights-of-way. The purpose of the District's right-of-way program is, to the extent possible, to allow uses of the rights- of-way that do not conflict with the flood control project. The rights-of way are used by both public and private concerns, including adjacent property owners, governmental entities, and utility companies. Jesus G. Quevedo is a private individual. His address is 2615 North Federal Highway, Lake Worth, Florida. The property at this address was vacant when Mr. Quevedo purchased it, and he has owned the property for approximately ten (10) years. The District has fee simple title to a strip of land on the south side of the District's C-51 Canal, immediately west of the Federal Highway/Olive Avenue bridge (C-51 Right-of-Way). Mr. Quevedo's property is located at the side of and adjacent to the C-51 Right-of-Way. The C-51 Right-of-Way is also located within the boundaries of Spillway Park as established in the agreement between the District and the City of Lake Worth. Generally described, Spillway Park includes the District's fee simple owned right-of-way on the south side of the District's C-51 Canal, beginning at the west side of the Federal Highway/Olive Avenue bridge and continuing to the east side of the Dixie Highway bridge. Mr. Quevedo has no real property interest in the C-51 Right-of-Way. Prior to purchasing his property, Mr. Quevedo was aware that the District owned the C-51 Right-of-Way. Historically, portions of Spillway Park and the C-51 Right-of-Way, in particular, have been a unique and popular location for excellent snook fishing by the public. These areas continue to be considered as such. On February 11, 1993, Mr. Quevedo was issued SFWMD Permit No. 9801 (Permit), a right-of-way occupancy permit, by the District’s Governing Board. The Permit authorized him to make use of the District’s lands and works as follows: 20’ X 50’ BOAT DOCK WITH WALKWAY, BURIED WATER AND ELECTRICAL SERVICE, POP-UP SPRINKLERS, AND SODDING WITHIN THE SOUTH RIGHT OF WAY OF C-51 LOCATED IMMEDIATELY WEST OF THE OLIVE AVENUE/FEDERAL HIGHWAY BRIDGE. During the permit application process, but prior to the issuance of the Permit, Mr. Quevedo had discussed with the District's staff the erection of a cross-fence based on allegations of improper or criminal activities by members of the public. Subsequently, in November 1995, Mr. Quevedo again discussed with the District's staff erection of a cross-fence based on the same allegations but he also included a new allegation of public safety as to the C-51 seawall. Based on the concern for public safety, the District's staff recommended that Mr. Quevedo be granted a modification to the Permit for a cross-fence. On November 14, 1996, the District's Governing Board approved, as part of its consent agenda, and issued SFWMD Permit MOD No. 9801 (MOD Permit)3 authorizing the following: CHAIN LINK CROSS FENCE WITH 16’ VEHICULAR GATE ALONG THE WEST PROPERTY LINE WITHIN THE SOUTH RIGHT OF WAY OF C-51 LOCATED AT 2615 NORTH FEDERAL HIGHWAY. The MOD Permit, as did the Permit, provides in pertinent part on its face the following: The permittee, by acceptance of this permit, hereby agrees that he shall promptly comply with all orders of the District and shall alter, repair or remove his use solely at his expense in a timely fashion. . . . This permit is issued by the District as a license to use or occupy District works or lands. . . By acceptance of this permit, the permittee expressly acknowledges that the permittee bears all risk of loss as a result of revocation of this permit. The MOD Permit, as did the Permit, contained standard limiting conditions, as provided in Rule 40E-6.381, Florida Administrative Code, and special conditions. The limiting conditions provide in pertinent part as follows: Permittee agrees to abide by all of the terms and conditions of this permit, including any representations made on the permit application and related documents. . . . This permit does not create any vested rights, and except for governmental entities and public or private utilities, is revocable at will upon reasonable prior written notice. Permittee bears all risk of loss as to monies expended in furtherance of the permitted use. Upon revocation, the permittee shall promptly modify, relocate or remove the permitted use. In the event of failure to so comply within the specified time, the District may remove the permitted use and permittee shall be responsible for all removal costs. This permit does not convey any property rights nor any rights or privileges other than those specified herein. . . . Having been granted the MOD Permit, Mr. Quevedo erected the cross-fence within and onto the C-51 Right-of-Way. The C-51 Right-of-Way is located adjacent to Mr. Quevedo’s property, as indicated earlier, and continues westerly to the permitted cross-fence. The C-51 Right-of-Way is enclosed by the cross-fence, preventing access by the public, and is located easterly of the cross-fence. As the C-51 Right-of-Way is located within the boundaries of the Spillway Park, the cross- fence is also located within the boundaries of the Spillway Park. During the time that Mr. Quevedo has owned his home, including prior to and after erection of the cross-fence, he, his family members and/or guests have frequently fished from the C-51 seawall and used the C-51 Right-of-Way enclosed by the cross- fence. Prior to and after the erection of the cross-fence, Mr. Quevedo and his family members have selectively controlled access by the public to the C-51 Right-of-Way at the C-51 seawall. Prior to the erection of the cross-fence, Mr. Quevedo chased members of the public off the C-51 Right-of-Way. Mr. Quevedo and members of his family also called law enforcement officers to remove members of the public who were located on the C-51 Right-of-Way, even if the members of the public were fishing from the C-51 seawall. After the erection of the cross-fence, Mr. Quevedo and his family members continued to engage in this conduct of selective access. Subsequent to the erection of the cross-fence, Mr. Quevedo had a member of the public arrested for trespassing. The person allegedly jumped over or went around the cross-fence to fish from the C-51 seawall in the C-51 Right-of-Way. With the existence of the cross-fence, Mr. Quevedo has prevented the general public from using the C-51 Right-of-Way, including the C-51 seawall. As a result, he has acquired the exclusive, private use of the C-51 Right-of-Way at the C-51 seawall, which is publicly owned land, and has, almost doubled the size of his adjacent property without the obligations and expense of acquisition, assuming he could acquire the property through acquisition. The District's policy is that public land should be open to the public. Contrary to this policy, Mr. Quevedo's cross-fence precludes access to the District's right-of-way (C-51 Right-of-Way), including the seawall, for passive recreational use. Similar cross-fencing, although not within the boundaries of Spillway Park, have been erected behind residences on the northeast, northwest, and southeast sides of Federal Highway, along the District’s C-51 Canal bank. The cross-fencing prevents public use of the District’s C-51 Canal bank at these locations. The City of Lake Worth made improvements within the boundaries of Spillway Park; however, it made no improvements, and does not intend to make any improvements in the future, at the C-51 Right-of-Way where Mr. Quevedo’s cross-fence is located or at the other private lots west of Mr. Quevedo's property. All of the improvements made at Mr. Quevedo’s cross-fence at the C-51 Right-of-Way have been made by him even though the C-51 Right-of- Way is located within Spillway Park. The original public safety rationale for authorizing Mr. Quevedo to erect the cross-fence blocking public access was revisited by the District. Additional investigation by safety experts (Risk Management staff) revealed that no unreasonable danger existed by allowing public access to the C-51 seawall at the C-51 Right-of-Way. In the absence of the public safety basis for closure of the C-51 Right-of-Way, such closure was contrary to District policy. As a consequence, the District’s staff recommended to the District’s Governing Board that the MOD Permit, authorizing Mr. Quevedo’s cross-fence, be revoked. After conducting two public meetings and receiving comments from Mr. Quevedo, members of the public, and the District’s staff as to the policy issue of pubic access to the C- 51 Right-of-Way, the District’s Governing Board determined that the C-51 Right-of-Way should be open to the public. Consequently, the Governing Board decided to revoke Mr. Quevedo's MOD Permit. Allegations of criminal activity within the general boundaries of Spillway Park and, specifically, in the C-51 Right- of-Way at the cross-fence area, were made by Mr. Quevedo as a basis to not revoke the MOD Permit and allow the cross-fence to remain. Such allegations have no bearing on the revocation of the MOD Permit.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order revoking SFWMD Permit No. MOD 981 issued to Jesus G. Quevedo. DONE AND ENTERED this 8th day of March, 1999, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of March, 1999.
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following facts are found: The respondent Mariner Properties, Inc., also referred to herein as the "applicant", is the owner of South Seas Plantation, a vacation resort located on Captiva Island. This resort development comprises some 300 acres, with two miles of gulf-front beaches and four miles of bayfront. Located on the northern end of the Island is an existing large yacht basin or marina with facilities for docking boats up to 100 feet in length. While this marina does have slips for about eight small boats (under 24 feet in length), the facility is not well suited for the docking of small boats because of the height of the docks. Fueling services are available at this marina and an active search and rescue service operates out of the marina, with no charge to boaters in distress. A smaller boat basin exists on the southern portion of the Island, which basin was enlarged by the applicant pursuant to a permit issued by DER in 1975. The applicant has also been granted a permit to construct boat docking facilities within the small boat basin. Finger slips for about 43 small boats - - up to 24 feet in length, are planned, but construction has not yet begun. The small boat basin will not have fueling facilities for the boats. If the requested permit is granted, the rescue service which operates out of the larger yacht basin plans to dock one of its service boats in the small basin. The small basin will also serve as a refuge area for small boaters during a storm or inclement weather. In May of 1977, Mariner Properties, Inc., submitted its application to the DER to modify an existing permit by dredging an access channel to connect its small boat basin to the waters of Pine Island Sound. In its present modified form, the applicant requests a permit to maintenance dredge a channel 250 fee long, fifteen feet wide, to a depth of -3.0 feet, mean low water. Approximately 195 cubic yards of material will be excavated to construct this channel and the spoil will be unloaded on an upland area. The project will involve the destruction of almost 4,000 square feet of seagresses. Mr. Kevin Erwin, an environmental specialist with the Department of Environmental Regulation, made site inspections and performed a biological assessment of the area as it relates to the proposed project. It was his conclusion and recommendation that the application be denied based on the expected significantly adverse immediate and long-term impacts upon water quality and marine resources. Mr. Erwin was concerned with the elimination of almost 4,000 square feet of productive vegetated estuarina bottoms. Seagrasses provide an essential habitat to many marine species, act as an important nursery and feeding ground for young fish and shrimp, stabilize marine bottoms and contribute nutrients to the foodweb. The witness further felt that there was a potential for water quality violations within the channel. Mr. Erwin did observe cuts or propeller scars in the grass beds adjacent to the proposed channel. Such cuts or scars take a long period, up to fifteen years, to heal. He felt that boat traffic to and from the small boat basin should be restricted by a marked easement, as opposed to a dredge channel. Mr. Erwin's District Manager, Phillip R. Edwards, reviewed the subject application and observed the area in question. It was his oral recommendation to Tallahassee that the permit be granted. Mr. Edwards observed the seagrass cuts in the area adjacent to the proposed dredging project and concluded that more damage would result without a channel. While Mr. Edwards agreed that a potential for water quality standards existed, he felt that a channel would minimize the overall damage caused by boats continuing to travel over the adjacent seagrass areas. Mr. Forrest Fields, an environmental specialist with DER, reviewed the present application and Mr. Erwin's biological assessment of the area. He did not concur with Erwin's conclusion regarding violations of water quality standards, and felt that the applicant had given reasonable assurances to the contrary. Mr. Fields was of the opinion that a minimal channel would be less damaging to grass beds than the uncontrolled ingress and egress of boats utilizing the small boat basin. The public interest concerns of the basin being opened to the boating public and the basin being used by a rescue service without charge to boaters in distress were also expressed in the notice of intent to issue the permit prepared by Mr. Fields. Mr. Ross McWilliams, an environmental specialist with DER who reviews the work and recommendations of Mr. Fields, also recommended that the permit application be granted. Mr. McWilliams balanced the definable public loss which would ensue from the elimination of the 4,000 square feet of grass beds against the public benefit to be gained for the availability of the project to the boating public and the operation of a marine rescue service form the small boat basin. It was his conclusion that the proposed project would not be contrary to the public interest. A considerable portion of the testimony of this proceeding was devoted to the issue of whether a previous channel existed on the proposed site. Taken as a whole, the evidence establishes that the area which the applicant seeks to deepen is presently deeper than the surrounding grass flats. Aerial photographs received into evidence indicate by a straight while line some human activity and that the area in question has been used as a channel. All expert witnesses agreed that at least the shorewared 20 to 25 feet of the area appeared to have been disturbed. It could not be conclusively determined whether and when a channel had been dredged and, if so, the extent of the same. It is clear, however, that the specific area had been used as an access channel for the small boat basin in question. The area over which the applicant seeks to dredge is a shallow grass flat inhabited by turtle grass (Thallasia) and Cuban Shoal weed (Halodule), and is a very productive area in the marine ecosystem. The waters are within the Pine Island Sound Aquatic Preserve, A Class II body of water. No rules, regulations or management plan have been promulgated by the Department of Natural Resources for the Pine Island Sound Aquatic Preserve. The proposed channel is to be of a "box-cut" design with a flat bottom and vertical walls. Such a design is likely to create the need for frequent maintenance due to the possibility that the soft sides will slough inward. If further maintenance dredging becomes necessary, a permit for the same from the Department of Environmental Regulation would be required. If granted authority, the applicant would accomplish the dredging by utilizing either the "mud cat" type of dredge or a clam shell dragline mounted on a barge. Turbidity curtains will used to minimize the effects of loosening the bay bottoms and proliferation of silt by the dredging operation. All material excavated from the proposed channel will be deposited on an upland site. The petitioners in this cause either own or manage waterfront property within the Pine Island Sound Aquatic Preserve, and utilize the waters thereof. They have adequately demonstrated their substantial interest in the proposed project.
Recommendation Based upon the findings of fact and conclusions of law recited above, it is RECOMMENDED that the Department of Environmental Regulation issue to Mariner Properties, Inc. a permit for the channel dredging project to the conditions set forth in Section III (B) of the Department's Proposed Order of Issuance executed on November 0, 1978, and subject to any forms of consent which may be required under Florida Statutes, Section 253.77. Respectfully submitted and entered this 11th day of April, 1978, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: David Gluckman Casey J. Gluckman 5305 Isabelle Drive Tallahassee, Florida 32301 Kenneth G. Oertel Truett and Oertel, P.A. 646 Lewis State Bank Building Tallahassee, Florida 32301 Ray Allen Assistant General Counsel Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32301 Secretary Jake Varn Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32301 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION SANIBEL-CAPTIVA CONSERVATION FOUNDATION, ROBERT RAUSCHENBERG and FLORIDA AUDUBON SOCIETY, Petitioner, vs. CASE NO. 78-2422 DEPARTMENT OF ENVIRONMENTAL REGULATION and MARINER PROPERTIES INCORPORATED, Respondent. / By the Department:
Findings Of Fact The Parties. The Petitioner, Clifford O. Hunter, is the owner of real property located at Dekle Beach, Taylor County, Florida. Mr. Hunter's property is located at lot 53, Front Street, Dekle Beach, within section 22, township 7 south, range 7 east, Taylor County. Respondent, the Florida Department of Environmental Protection (hereinafter referred to as the "Department"), is an agency of the State of Florida with responsibility for, among other things, dredge and fill permits involving Florida waters. Mr. Hunter lived in a home on his Dekle Beach property until a storm in March of 1993 destroyed the home. Mr. Hunter's Application for Permit. On or about June 2, 1993, Mr. Hunter applied for a wetland resource permit to rebuild his home, construct a bulkhead and fill 1750 square feet of salt marsh. The permit was designated No. 62-232123-2 by the Department. Mr. Hunter also sought approval for the construction of a dock. The dock, however, is exempt from the permitting requirements of Rule 17- 312.050(1)(d), Florida Administrative Code. On July 21, 1993, the Department issued a Notice of Permit Denial. The Notice of Permit Denial was received by Mr. Hunter. On August 13, 1993, Mr. Hunter filed a Request for Formal Administrative Hearing with the Department contesting the denial of his permit application. The Department's Jurisdiction Over the Proposed Project. The proposed project involves dredging and filling in the waters of the State of Florida. A wetland resource permit is, therefore, required. Wetland jurisdiction of the State of Florida extends to the eastern edge of an existing concrete slab on Mr. Hunter's property from a canal adjacent to Mr. Hunter's northern boundary. The canal connects with the waters of the Gulf of Mexico. The Gulf of Mexico surrounding Dekle Beach, except for an area extending 500 feet outward from the town limits of Dekle Beach, is within the Big Bend Seagrasses Aquatic Preserve. The preserve is an Outstanding Florida Water (hereinafter referred to as an "OFW"). The evidence presented by the Department to support findings of fact 9, 10 and 11 was uncontroverted by Mr. Hunter. Impact on Water Quality Standards. The weight of the evidence failed to prove that the Mr. Hunter has provided reasonable assurances that the proposed project will not lower the existing ambient water quality of waters of the State of Florida. The evidence presented by the Department concerning adverse impacts of the proposed project on water quality standards was uncontroverted by Mr. Hunter. Approval of Mr. Hunter's proposed project would allow the placing of fill in an intertidal area and the elimination of the portion of the intertidal area filled. Intertidal areas help maintain water quality by acting as a filter for water bodies. Mr. Hunter has obtained a variance from the Department of Health and Rehabilitative Services which will allow him to place a septic tank on his property if the permit is granted. The septic tank will leach pollutants. Those pollutants will include nutrients, viruses and bacteria. Because the soil around the septic tank is very saturated, filtering of the pollutants will be low. Pollutants will, therefore, leach into the waters of the State of Florida and adversely impact water quality standards of the canal adjacent to Mr. Hunter's property. Under such circumstances, Mr. Hunter has failed to demonstrate that the project will not lower existing ambient water quality of waters of the State of Florida. Public Interest Test. Mr. Hunter failed to present evidence to support a conclusion that the proposed project will not be adverse to the public interest. Rather, the unrebutted evidence presented by the Department supports a finding that Mr. Hunter's proposed project will not be in the public interest, especially when the cumulative impacts of the proposed project, discussed, infra, are considered. Possible adverse impacts to the public interest include the following: The septic tank which Mr. Hunter will place in the 1750 square feet of filled area will allow fecal coliform, viruses and pathogens to leach into the waters of the canal adjacent to Mr. Hunter's property. Anyone who enters the canal could be infected from bacteria and viruses leaching from the septic tank. The conservation of fish and wildlife would also be adversely affected by the adverse impact on water quality and by the elimination of intertidal area. Recreational value of the canal would be reduced because of the adverse impact on water quality. The proposed project is for a permanent structure. Cumulative Impact. There are a number of applications for permits similar to the application filed by Mr. Hunter which have been filed by property owners of Dekle Beach whose homes were also destroyed by the March 1993 storm. If Mr. Hunter's permit application is granted, the Department will have to also grant most, if not all, of the other similar permit applications. Approximately 20 to 30 other applications involve similar requests which will allow the placement of fill and the installation of septic tanks. The resulting fill and use of septic tanks will have a significant cumulative adverse impact on the waters of the State of Florida. The cumulative impact from leaching effluent from the septic tanks on the waters of the State could be substantial. In addition to the impact on the canal adjacent to Mr. Hunter's property, there will a cumulative negative impact on the ambient water quality of approximately 20 septic tanks on the canals and on the OFW. Errors in the Department's Notice of Permit Denial. The Notice of Permit Denial issued by the Department contained the following errors: An incorrect description of Mr. Hunter's lot number and section number; An incorrect statement that the amount of Mr. Hunter's proposed fill would eliminate 3,200 square feet of marsh; An incorrect statement that Mr. Hunter proposed to fill his lot for a distance of 64 feet waterward. The errors contained in the Notice of Permit Denial did not form any basis for the Department's denial of Mr. Hunter's application. The errors were typographical/word-processing errors. Several notices were being prepared at the same time as the Notice of Permit Denial pertaining to Mr. Hunter. The incorrect information contained in Mr. Hunter's Notice of Permit Denial was information which applied to the other notices. Other than the errors set out in finding of fact 23, the Notice of Permit Denial was accurate. Among other things, it was properly addressed to Mr. Hunter, it contained the project number assigned by the Department to Mr. Hunter's proposed project and it accurately reflected the Department's decision to deny Mr. Hunter's permit application. Mr. Hunter responded to the Notice of Permit Denial by requesting a formal administrative hearing to contest the Department's denial of his application. On December 20, 1993, Mr. Hunter received a letter from the Department which corrected the errors contained in the Notice of Permit Denial. The corrections were also contained in a Notice of Correction filed in this case by the Department on December 20, 1993. The Notice of Permit Denial was received by Mr. Hunter within 90 days after his application was filed. The corrections to the Notice of Permit Denial was received by Mr. Hunter more than 90 days after his application was filed.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a Final Order dismissing the petition in this case and denying the issuance of permit number 62-232123-2 to Clifford O. Hunter. DONE AND ENTERED this 26th day of April, 1994, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 1994. APPENDIX The parties have submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Mr. Hunter's Proposed Findings of Fact Accepted in 1 and 3. Accepted in 2. Accepted in 4. Although Ernest Frey, Director of District Management, Northeast District Office of the Department, did ask Mr. Hunter whether he wanted to sell his property to the State, the evidence failed to prove why Mr. Frey asked this question, that Mr. Frey asked the question in his official capacity with the Department, or that Mr. Frey made the inquiry at the direction or on behalf of the Department or the State. More importantly, the evidence failed to prove that the Department denied the permit sought by Mr. Hunter because of any interest the State may have in purchasing Mr. Hunter's property. See 4. 6-8 No relevant. Not supported by the weight of the evidence. Accepted in 6, 23, 28 and 30. Not a proposed finding of fact. See 8. The "aerial photo, Petitioner's exhibit 6, does not show "No vegetation behind the slab, nearly to the Mean High Water Line . . . ." Respondent's exhibit 3 does, however, show vegetation as testified to by Department witnesses. 13-14 Not supported by the weight of the evidence. Not a proposed finding of fact. Generally correct. Mr. Hunter was not properly put on notice of "alternatives" by the Notice of Permit Denial, as corrected, issued by the Department. Summation: Mr. Hunter's Summation was considered argument and was considered in this case. The Department's Proposed Findings of Fact Accepted in 1 and 3. Accepted in 2. Accepted in 1 and 4-5. Accepted 6-7. Accepted in 8. 6-9 Hereby accepted. Accepted in 12. Accepted in 13. Accepted in 14. Accepted in 15. Accepted in 19. Accepted in 20. Accepted in 15. 17-18 Accepted in 15 and hereby accepted. Accepted in 15 and 20-21. Accepted in 10. Accepted in 22. Hereby accepted. Accepted in 22. Accepted in 12. Accepted in 15-16. Accepted in 17 and 21. 27-28 Accepted in 17. Accepted in 18. Accepted in 13. Accepted in 16. 32-33 The Notice of Permit Denial, as corrected, did not put Mr. Hunter on notice that the alternatives raised by the Department at the final hearing would be an issue in this case. Those alternatives should not, therefore, form any basis for the Department's final decision. Accepted in 24-25. Accepted in 23. Accepted in 25. Accepted in 24 and hereby accepted. Accepted in 26. COPIES FURNISHED: Clifford O. Hunter 1410 Ruby Street Live Oak, Florida 32060 Beth Gammie Assistant General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-9730 Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, Esquire General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400
The Issue The issue is whether an Environmental Resource Permit (ERP) and a Letter of Consent to Use Sovereignty Submerged Lands (Letter of Consent) should be issued to Respondent, Palm Beach County (County), authorizing it to fill 7.97 acres of submerged lands for a restoration project in Lake Worth Lagoon.
Findings Of Fact Based upon all of the evidence, the following findings are determined: The Parties Trump is the owner association for a two-towered residential and commercial condominium building located at 525 South Flagler Drive in downtown West Palm Beach, upland and west of the project site in the Lagoon. Each tower rises thirty floors and together they have of two hundred twenty units. The first five floors are common areas including a lobby on the first floor, while a pool and patio are located on the fifth floor of the north tower. The property is separated from the Lagoon by Flagler Drive, a four-lane divided road with landscaping and sidewalks which runs adjacent to, and on the western side of, the Lagoon. There is no dispute that Trump has standing to initiate this action. Flagler owns, manages, and leases two multi-story office buildings located at 501 Flagler Drive on the upland real property directly west of the project location. Like the Trump property, the Flagler property is separated from the Lagoon by Flagler Drive. There is no dispute that Flagler has standing to participate in this matter. The County is a political subdivision of the State and is the applicant in this proceeding. The Department is the state agency with the authority under Part IV, Chapter 373, Florida Statutes,2 to issue to the County an ERP for the project, as well as authority as staff to the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees) to authorize activities on sovereign submerged lands pursuant to Chapter 253, Florida Statutes, and Chapter 18-21. Background On October 29, 2007, the County submitted to the Department its Joint Application for an ERP and Letter of Consent to use sovereignty submerged lands in the Lagoon owned by the Board of Trustees. The application was assigned File No. 50- 0283929-00. After an extensive review process, including three requests for additional information, on August 12, 2008, the Department issued its Notice of Intent authorizing the County to fill 7.97 acres of submerged lands in the Lagoon with approximately 172,931 cubic yards of sand and rock material to create the following: (a) approximately 1.75 acres of red mangrove habitat including 1.52 acres of mangrove islands and 0.23 acres of red mangrove planters; (b) approximately 0.22 acres of cordgrass habitat; (c) approximately 0.90 acres of oyster habitat; (d) approximately 3.44 acres of submerged aquatic vegetation habitat; and (e) a 10-foot by 556-foot (5,560 square feet) public boardwalk with two 3-foot by 16-foot (48 square feet) educational kiosk areas and a 16-foot by 16-foot (256 square feet) observation deck for a total square footage of approximately 5,912 square feet. The Notice of Intent also included a number of general and specific conditions particular to this project. Trump (by timely Petition) and Flagler (by intervention) then challenged the Notice of Intent. They contend generally that the project unreasonably infringes upon or restricts their riparian rights and fails to meet the permitting and consent to use criteria set forth in Chapters 18-21 and 40E-4, as well as Chapter 373, Florida Statutes, and Section 253.141, Florida Statutes. Conflicting evidence on these issues was presented at the hearing. The conflicts have been resolved in favor of the County and the Department, who presented the more persuasive evidence. The Project The project area is a cove in the Lagoon, a Class III water body which extends within the County from North Palm Beach to Manalapan. The western side of the water body in the project area is lined with a vertical concrete seawall approximately 6.64 feet above the mean low water line. The waters immediately adjacent to the Trump and Flagler upland property are generally two to five feet deep along the seawall. To the east lies the island of Palm Beach, to the south is the Royal Park Bridge, which connects West Palm Beach and the Town of Palm Beach, while to the north is the Flagler Memorial drawbridge. The Lagoon is approximately 2,000 feet from shore to shore. The Intracoastal Waterway (ICW) runs roughly through the middle of the Lagoon in a north-south direction. Currently, there is an artificial dredge hole in the project area around four hundred feet from the western seawall. The dredge hole, which descends to approximately twenty feet at its deepest location, is filled with muck, which can be re- suspended by wave energy into the water, blocking the sunlight necessary for the support of biotic life. The muck covers the natural hard bottom, consumes oxygen, and presents an unsuitable environment for benthic organisms. The dredge hole is too deep to support seagrasses. The project calls for filling the dredge hole to intertidal elevations, i.e., between the high and low tide elevations, for mangroves and elevations suitable for seagrass. In all, approximately 173,000 cubic yards of fill will be placed in and around the hole to build up three separate islands within the project footprint, on which the County will plant 10,000 red mangroves, which naturally grow between fifteen and twenty-five feet in height. (The County estimates that eighty to ninety percent of the mangroves will survive and grow to a height of at least fifteen feet.) The top of the islands, not including mangroves, will be just below the mean high water mark. The County also proposes locating planters along the seawall and oyster reefs along the southern end of the project. The planters are designed to extend out approximately twenty feet from the seawall and will be placed on sovereign submerged lands. The last five feet will consist of limestone rock. Mangrove, spartina, and seagrass habitats will provide a biodiverse source of food and habitat for other species, and occurs naturally within the Lagoon but has been lost over time. Oyster habitat is proposed for additional bio-diversity and to provide a natural water filtration function. From the County's perspective, the restoration project would be incomplete without all the habitats proposed. The planters will be at an intertidal elevation, planted with red mangroves and spartina, and faced with rock to reduce wave energy in the area. The oyster reefs are rock structures designed to rise one foot above mean high water line for visibility to boaters. The project also includes a boardwalk and attached educational kiosks on the south side of the project to bring the public in contact with the habitats. The County will maintain the boardwalk, empty the trash daily, and open/close the gates at sunrise/sunset. The County proposes a minimum ten-foot buffer between seagrass beds and the fill area. The project is part of the County's Lagoon Management Plan, which outlines the County's restoration goals within the Lagoon. The County has performed numerous other restoration projects within the Lagoon to re-introduce mangrove and seagrass habitat, such as Snook Island, which consisted of filling a 100- acre dredge hole, installing mangrove islands, seagrass flats, and oyster reefs. The Snook Island project restored mangrove habitat and recruited fish and bird species, including endangered and threatened species. Snook Island has remained stable, with no sediment deposition or erosion. The County intends to fill the dredge hole with native lagoon bottom sediment. A clam-shell machine will deposit the sediment below the water line to reduce turbidity. Sediment will be placed around the edges of the dredge hole, reducing the velocity of the fill as it settles to the bottom and encapsulates the muck, as required by Draft Permit Special Condition No. 19. The County will use turbidity curtains, monitor conditions hourly, and stop work if turbidity levels rise beyond acceptable standards. These precautions are included in Draft Permit Conditions 12, 13, and 14. The County will use construction barges with a four- foot draft to avoid propeller dredge or rutting and will place buoys along the project boundary to guide the construction barges, precautions integrated into the Draft Permit conditions. The County's vendor contracts require maintenance of construction equipment to prevent leakage. A similar condition is found in the Draft Permit. Both the intertidal and seagrass flats elevations at the top of the islands will be built at a 4:1 slope; elevations subject to wind and wave energy will be reinforced with a rock revetment constructed of filter cloth and rock boulders. Seagrass elevations will have no reinforcing rock because they are deep enough to avoid significant currents. Proposed drawings were signed and sealed by a professional engineer. The ERP Criteria To secure regulatory approval for an ERP, an applicant must satisfy the conditions in current Rules 40E-4.301 and 40E- 4.302. The first rule focuses primarily on water quantity, environmental impacts, and water quality. The latter rule requires that a public interest balancing test be made, and that cumulative impacts, if any, be considered. Also, the BOR, which implements the rule criteria, must be taken into account. a. Rule 40E-4.301 21. Paragraphs (1)(a), (1)(b), (1)(c), (1)(g), (1)(h), and (1)(k) and subsections (2) and (3) of the rule do not apply. Although Trump and Flagler have focused primarily on paragraphs (1)(d), (f), and (i) in their joint Proposed Recommended Order, all remaining criteria will be addressed. Paragraph (1)(d) requires that an applicant give reasonable assurance that the proposed activity "will not adversely affect the value of the functions provided to fish and wildlife and listed species by wetlands and other surface waters." Based on the project design, the filling of the dredge hole and capping of muck, the restoration of seagrass habitat, and the creation of mangrove habitat, the project will have no adverse impacts but rather will be beneficial to the value of functions for fish and wildlife. Paragraph (1)(e) requires that an applicant give reasonable assurance that the proposed activity will not adversely affect the quality of receiving waters. The County will be required to manage turbidity that may be generated from the project. In part, the turbidity will be contained by the proposed construction method for filling the dredge hole. As noted earlier, the native sand will be deposited using a clamshell-type arm to dump the sand under the water around the periphery of the edge of the downward slope of the dredge hole. This will continue around the periphery of the hole, building up a lip and letting it slide down towards the bottom of the hole, squeezing the muck into the center of the hole and beginning to encapsulate it. Once there are several feet of native sand over the muck to encapsulate it, the County will resume the filling at the target rate. Subsection 4.2.4.1 of the BOR requires that the County address stabilizing newly created slopes of surfaces. To satisfy this requirement, the County will place the fill at a 4:1 slope. The outer edge of the mangrove islands slope back to a 4:1 slope and use rock rip-rap to stabilize that slope. Also, filter cloth, bedding stones, and boulders will be used. Because water currents slow near the bottom, the 4:1 slope for the seagrass elevations on the bottom will not de-stabilize. There will be turbidity curtains around the project area. Those are floating tops and weighted bottoms that reach to the bottom and are intended to contain any turbidity that may be generated by the project. Specific Conditions 12, 13, and 14 require extensive monitoring of turbidity. The County proposes to use a barge with a draft no greater than four feet. This aspect of the project will require a pre-construction meeting and extensive monitoring throughout the project. As a part of the application review, the County performed a hydrographic analysis which was coordinated with and reviewed by the Department staff. There are no expected debris or siltation concerns as a result of the project. The more persuasive evidence supports a finding that over the long term, the project is expected to have a beneficial effect on water quality. By filling the dredge hole and providing habitat for seagrass, mangroves, and oysters, the project will provide net improvement to water quality. The requirements of the rule have been met. Paragraph (1)(f) requires that the applicant provide reasonable assurance that the activities will not "cause secondary impacts to the water resources." More detailed criteria for consideration are found in BOR Subsection 4.2.7. The County has provided reasonable assurance that through best management practices, it will control turbidity. Also, Specific Conditions in the proposed permit require that water quality monitoring be conducted throughout the process. There will be no impacts to upland habitat for aquatic or wetland dependent species. This is because a vertical seawall is located upland of the project site, and no surrounding uplands are available for nesting or denning by aquatic or wetland dependent listed species. A secondary impact evaluation also includes an evaluation of any related activities that might impact historical and archaeological resources. There are, however, no historical or archaeological resources in the area. If resources are uncovered during the project, Draft Permit conditions require notification to the Department of State. Finally, there are no anticipated future activities or future phases on the project to be considered. Rule 40E-4.301(1)(i) requires that the applicant provide reasonable assurance that the project "will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed." Trump and Flagler contend that the project cannot be constructed and successfully operated as proposed. Trump's expert witness, Joseph Pike, testified that there were ambiguities and conflicts within the plan drawings that would require changes upon build-out; either fill will be placed outside of the fill area, or the mangrove islands will be smaller than depicted. Mr. Pike also voiced concerns that a 4:1 slope would not be stable and might cause fill to migrate to existing seagrass beds. He further stated that the Snook Island project included 18:1 slopes, and he thought providing rock revetment only at the intertidal zone was insufficient. Mr. Pike acknowledged that he had used 4:1 slopes in lake projects; however, in a tidal project involving fill placement, he opined that a 4:1 slope was likely to "relax." He did not do calculations about what slope might hold and admitted that prior experience using similar slopes with the same type of fill might change his opinion. Finally, Mr. Pike noted that a portion of the dredge hole would not be filled and concluded that the project would not fully cap the muck. Trump's biologist, James Goldasitch, speculated that the water flow changes would cause sediment deposition on existing seagrass beds, possibly causing the seagrasses to die. He admitted, however, that the County's plans called for the creation of 3.44 acres of seagrass and did not know the amount of habitat created compared to the amount of habitat he anticipated being affected. The Department's engineer, Jack Wu, approved the hydrologic aspects of the County's plan, but Mr. Goldasitch speculated that Mr. Wu was more focused on shoreline stability than on depositional forces. Mr. Goldasitch never actually spoke to Mr. Wu regarding his analysis, and Mr. Wu's memorandum refers not only to engineering and construction aspects of the proposal but also to the criteria in Rules 40E-4.301 and 40E-4.302. Mr. Goldasitch believed the County's boardwalk will impact the seagrass beds by blocking sunlight, but acknowledged that the Draft Permit required the boardwalk to be elevated and portions to be grated. Both the Florida Fish and Wildlife Conservation Commission and the Department's expert witness concluded that the permit conditions for constructing the boardwalk, which are common, eliminated impacts to seagrass. Mr. Goldasitch further opined that the 4:1 slope might slump, but then deferred to the opinion of a registered engineer on this type of engineering matter. The County presented its professional engineer, Clint Thomas, who worked on the project design. Mr. Thomas explained that permit drawings are not intended to be construction-level in detail, but are merely intended to provide sufficient detail for the regulator to understand the project within the 8 and 1/2 by 11-inch paper format required by the Department. The County will ultimately prepare permit-level, construction-level, and as-built drawings. Permit conditions also require a pre-construction meeting. No fill will be placed outside the area designated for fill, and the 4:1 slope will start at the outer boundary of the designated fill area until it reaches the specified elevation. Mr. Thomas acknowledged that the plan view drawings depict a mangrove island too close to the western project boundary, but stated that the mangrove island would simply be placed farther to the east during the construction-level plan process. Islands will become smaller islands, but will not be relocated, and in no event will the fill area expand; the fill boundary is a very strict limit. There is no evidence that the County has ever violated a fill boundary established in a permit. The 4:1 slope was based on the type of fill proposed for the project and to maximize project features. Mr. Thomas has successfully used 4:1 slopes with non-compacted fill in the Lagoon, both at Snook Island in its as-built state and at other projects. The islands at Snook Island are similar to those proposed. Other areas in the Lagoon have held slopes steeper than 4:1 with the same type of fill. Therefore, Mr. Thomas opined the 4:1 slope would hold. In rendering this opinion, he explained that the currents in the project vicinity are only around 1.2 knots. Because currents slow near the bottom, the 4:1 slope for the seagrass elevations on the bottom will not de- stabilize. Mr. Thomas addressed the contention that a change in water flow velocity would cause sediment to deposit on existing seagrass. The oyster reefs are rubble structures that allow the water to flow through. If any sediment flows through, it will deposit on the north side of the oyster bar, rather than on the seagrass beds. Given these considerations, the evidence supports a finding that the project will function as proposed. Finally, paragraph (1)(j) requires that the County provide reasonable assurance that it has the financial, legal, and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit. The evidence supports a finding that the County has complied with this requirement. In summary, the evidence supports a finding that the County has given reasonable assurance that the project satisfies the criteria in Rule 40E-4.301. b. Rule 40E-4.302 In addition to the conditions of Rule 40E-4.301, the County must provide reasonable assurance that the construction of the proposed project will not be contrary to the public interest. See Fla. Admin. Code R. 40E-4.302(1)(a)1.-7. Rule 40E-4.302(1)(a)1. requires that the Department consider whether the activity will adversely affect the public health, safety, or welfare or the property of others. Trump first contends that the project will increase the mosquito population. The evidence shows, however, that the mangroves will be placed below the mean high water mark and therefore no increase in mosquitoes should occur. Also, the design of the project, coupled with the local mosquito control program, should ensure that there will be no increase in mosquito population or a risk to the public health. Trump also raised the issue of an increase in trash along the boardwalk area or in the newly-created mangrove islands. The County presented evidence that there will be appropriate trash receptacles in the area as well as regular garbage collection. In terms of safety, navigation markers are included as a part of the project for safe boating by the public. The County consulted with the United States Coast Guard regarding navigation issues. Further, the project will not cause flooding on the property of others or cause an environmental impact on other property. Although a number of Trump residents expressed sincere and well-intended concerns about the project impacting the value of their condominiums (mainly due to a loss of view), BOR Subsection 4.2.3.1(d) provides that the "[Department] will not consider impacts to property values or taxes." Rule 40E-4.302(1)(a)2. requires that the Department consider whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. Subparagraph 4. of the same rule requires that the Department consider whether the activity will adversely affect the fishing or recreational value or marine productivity in the vicinity of the activity. The proposed activity is a restoration project for the creation of seagrass and mangrove habitats. As such, it is beneficial to the conservation of fish and wildlife and is expected to increase the biotic life in the project area. Besides providing additional habitat for fish and wildlife, the project will add to the marine productivity in the area. In terms of recreational opportunities, the project is expected to be a destination for boating, kayaking, fishing, and birdwatching. The Florida Fish and Wildlife Conservation Commission has also recommended issuance of the permit with the standard manatee condition for in-water work. This recommendation has been incorporated as Specific Conditions 23 through 25 Rule 40E-4.301(1)(a)3. requires that the Department consider whether the activity will adversely affect navigation and the flow of water, or cause harmful erosion or shoaling. The nearest navigation channel is the ICW. The project is located outside of that area. Subsection 4.2.3.3 of the BOR provides additional guidance on the evaluation of impacts of this nature. Paragraph (a) of that subsection provides that, in evaluating a proposed activity, the Department "will consider the current navigational uses of the surface waters and will not speculate on uses which may occur in the future." Trump residents indicated that in the project area persons are now picked up off the seawall and then travel to the ICW. Access to the seawall is possible from the east and south, although existing shoals currently limit the approach from the south. Large boats do not use the area because of shoals. In general, "[t]here's not a whole lot of boating activity in the project area." The parties agree that if the project is constructed as designed, boats will not be able to travel directly out from the seawall in front on Trump or Flagler to the ICW, as they now do. However, navigation in the area will still be available, although not as convenient as before. As to water flow, shoaling, and erosion, the more persuasive evidence supports a finding that the 4:1 slope will be stable and will not cause fill to migrate outside of the boundaries of the project into existing seagrass beds. The tidal flow will continue through the area after construction without sediment deposition into existing seagrass beds or destabilizing the 4:1 slope. There will be no shoaling or erosion. Finally, the project will be permanent and there are no significant historical and archaeological resources in the area. See Fla. Admin. Code R. 40E-4.302(1)(a)5. and 6. In summary, the evidence supports a finding that the County's proposal is neutral as to whether the activity will adversely affect the public health, safety, welfare, or the property of others; that the County's proposal is neutral with respect to navigation, erosion and shoaling, and water flow, as well as to historical and archaeological concerns; and that the County's proposal is positive with respect to the conservation of fish and wildlife, recreational values and marine productivity, permanency, and current values and functions. When these factors are weighed and balanced, the project is not contrary to the public interest and qualifies for an ERP. D. Proprietary Authorization Chapter 18-21 applies to requests for authorization to use sovereign submerged lands. The management policies, standards, and criteria used to determine whether to approve or deny a request are found in Rule 18-21.004. In making its review, the Department reviews the rule in its entirety; it also looks at the forms of authorization (e.g., letters of consent, leases, deeds, or easement) to determine the most appropriate form of authorization for an activity. Trump and Flagler have raised contentions regarding the proprietary authorization, including whether the application should have been treated as one of heightened public concern, whether the proper form of authorization has been used, and whether their riparian rights are unreasonably infringed upon by the project. Heightened Public Concern Rule 18-21.0051 provides for the delegation of review and decision-making authority to the Department for the use of sovereign submerged lands, with the following exception found in subsection (4) of the rule: (4) The delegations set forth in subsection (2) are not applicable to a specific application for a request to use sovereign submerged lands under Chapter 253 or 258, F.S., where one or more members of the Board, the Department, or the appropriate water management district determines that such application is reasonably expected to result in a heightened public concern, because of its potential effect on the environment, natural resources, or controversial nature or location. On March 13, 2008, the Department's West Palm Beach District Office sent a "heightened public concern [HPC]) memo" to the Department's review panel in Tallahassee,3 seeking guidance as to whether the project required review by the Board of Trustees under the above-cited rule. The Department emailed the County on March 14, 2008, stating that the project would be elevated to the Board of Trustees for review to approve the entire Lagoon Management Plan. The County asked for reconsideration, concerned over timing restraints on grant opportunities. This concern is based on the fact that the County will receive grant monies to assist in the construction of the project and must have regulatory approval by a date certain in order to secure those funds. A second HPC memorandum was sent to the review panel on April 22, 2008. Part of the interim decision to elevate the application to the Board of Trustees concerned the boardwalk connection to the City of West Palm Beach's existing seawall. The City of West Palm Beach is the upland owner of the seawall, sidewalk, and Flagler Drive. On June 9, 2008, the Mayor of West Palm Beach sent a letter to the Department stating that the City "fully supports" the proposed activity, and that the County and the City collaborated on the design of the project, held joint public meetings, and produced a project video. See Department Exhibit Trump and Flagler argue that under the City Charter, the Mayor cannot unilaterally bind the local government to allow structures to be built on City property. Assuming this is true, one of the remaining conditions for the County to initiate the project is to obtain a "letter of concurrence" from the City of West Palm Beach authorizing the County to connect the boardwalk to the seawall. Therefore, the review panel ultimately concluded that the application could be reviewed at the staff level and did not require Board of Trustees review. The evidence at hearing did not establish that the application was one of heightened public concern, given the limited size of the project, its location, and the net benefit to both environmental and natural resources. Compare Brown, et al. v. South Fla. Water Mgmt. Dist., et al., DOAH Case No. 04-0476, 2004 Fla. ENV LEXIS 112 (DOAH Aug. 2, 2004, SFWMD Sept. 8, 2004). Therefore, review by the Board of Trustees was not required. Form of Authorization Trump and Flagler contend that an easement is required by the County, rather than a consent of use. The standard for obtaining an easement is more stringent than a consent of use, and an easement offers a greater interest in sovereign lands. Rule 18-21.005(1) provides the general policy direction for determining the appropriate form of authorization and reads in relevant part as follows: It is the intent of the Board that the form of authorization shall grant the least amount of interest in the sovereignty submerged lands necessary for the activity. For activities not specifically listed, the Board will consider the extent of interest needed and the nature of the proposed activity to determine which form of authorization is appropriate. This rule requires that the Department should apply the lowest and least restrictive form of authorization. Trump and Flagler argue that the County's project constitutes a spoil disposal site under Rule 18-21.005(1)(f)8., a public water management project other than public channels under Rule 18-21.005(1)(f)10., or a management activity which includes "permanent preemption by structures or exclusion of the general public," as described in Rule 18-21.005(1)(f)11. Each of these activities requires an easement rather than a letter of consent in order to use sovereign submerged lands. The evidence shows that the County's project is not a spoil disposal site. Also, it is not primarily a public water management project as there is no evidence that the project relates in any way to flood control, water storage or supply, or conservation of water. Likewise, there is no evidence indicating that the activities will prevent access by the public by exclusion. Even though many of the features (structures) of the project will be permanent, the project is intended to generally increase public access to water resources, as well as the islands, boardwalk, and kiosks. Besides raising the issue of heightened public concern, the second HPC Memorandum dated April 22, 2008, sought guidance as to whether the project required a consent of use or an easement. The review panel concluded that the project qualified for a consent of use, rather than an easement under Rule 18- 21.005(1)(f), because the County's project most closely fits the definition in Rule 18-21.005(1)(c)15. That rule provides that if the proposed activity involves "[h]abitat restoration, enhancement, or permitted mitigation activities without permanent preemption by structures or exclusion of the general public," an applicant may use sovereign submerged lands with a consent of use. Because the County's project increases public access not only to water resources in the Lagoon but also to the permanent structures being built, it more closely falls within the type of activity described in Rule 18-21.005(1)(c)15. Notably, all of the County's restoration projects in the Lagoon have been previously authorized through a consent of use. Finally, the review panel concluded that the project did not fall under Rule 18-21.005(1)(f)16., which requires an easement for environmental management activities that include "permanent preemption by structures or exclusion of the general public" because of the rule's focus on the exclusion of the general public. Riparian Rights The parties have stipulated, for the purpose of this proceeding, that Trump and Flagler have riparian rights, including view, ingress/egress, fishing, boating, swimming, and the qualified right to apply for a dock, that should be considered. Trump and Flagler contend that their right to wharf out (build a dock) from the seawall, ingress/egress from navigable water, and view will be unreasonably infringed upon if the application is approved. See Fla. Admin. Code R. 18- 21.004(3)(a)("[n]one of the provisions of this rule shall be implemented in a manner that would unreasonably infringe upon the traditional, common law riparian rights, as defined in Section 253.141, F.S., of upland property owners adjacent to sovereignty submerged lands"). For the reasons given below, the greater weight of evidence establishes that none of these riparian rights will be unreasonably infringed upon. Currently, while access is possible from the east and the southern approaches, existing shoals limit the southern approach. The boardwalk will further limit boat traffic on the south end, and boats would not be able to cross over the islands. Boat traffic will still be able to access the cove from the north end, and the restoration project will create a boating destination. Trump witness Pike opined that the County's project would negatively affect navigation between the upland parcels and the ICW because the project would eliminate the eastern and southern approaches and leave only the northern approach, which could not be used by both parcels fully. The County's expert, Dr. Nicholas De Gennarro, testified that, during his site visits, he observed boat traffic waiting for the drawbridges using the east side of the ICW away from the project site. Dr. De Gennarro noted that several existing structures are closer to the ICW than the proposed County project, which lies 220 feet away from the ICW. Thus, Dr. De Gennarro concluded that the project would not impact navigation in the ICW. With respect to ingress/egress, Dr. De Gennarro acknowledged that access to the Trump and Flagler properties would not be available from the southern and eastern approaches, but concluded that the restriction represented nothing more than an inconvenience. He noted that the southern approach was already a less preferable approach due to existing shoals. At present, there is very little boating in the area outside of special events. While the project would limit the use of boats directly over the one and one-half acres of mangrove islands, the project will provide a boating destination. Further, both the City docks to the north of the site and the temporary docks in front of Flagler's property –- both used for special events –- will still be available under the County's proposal. There is no swimming and very little fishing in the area because of the degraded conditions caused by the dredge hole. Accordingly, while the project will fill a small portion of water currently available, but not used, for swimming, it will greatly enhance swimming by providing a destination for swimmers. The mangroves planned for the intertidal islands are likely to reach a height of fifteen feet and will be interspersed with spartina. The seawall is located six feet above the water line, making a person's view at eye level already several feet above the water. Trump and Flagler's buildings are built at even higher elevations. Therefore, the mangroves will not substantially obscure the view from either property, even at street level where the view is already partially obscured by existing landscaping. The Lagoon is approximately 2,000 feet across. From north to south around one hundred acres of water can now be viewed from the vicinity. Since the intertidal islands only comprise one and one-half acres, the overall impact to the view of the water body is very small. The mangroves in the planters extending out from the seawall will be trimmed to one foot above the seawall; the County requested the condition and committed at hearing to trimming the mangroves if the City of West Palm Beach does not. County photographs show Trump and Flagler's present view of the water body and demonstrate the comparatively small percentage of the view affected by the one and one-half acres of mangrove islands. See County Exhibits 133a-e and 134a-d. The photographs also demonstrated that sizeable palm trees are already part of the existing view. Additionally, the County photographs depicted the small impact that trimmed mangrove planters would have on the view. The area obstructed by the mangrove islands and seagrass is negligible compared to the expanse of the existing view. Trump and Flagler offered no evidence to contradict the County's analysis regarding the scope of the impact on the view. Trump residents Dale McNulty, Dean Goodman, and Charles Lemoine testified that they personally would not want to view mangrove islands regardless of tree size or the size of the islands. Understandably, after years of unfettered view and an open expanse of water, they are opposed to any type of project in this area of the Lagoon. However, Mr. Goodman acknowledged that he would still be able to see the Town of Palm Beach from his unit. The evidence supports a finding that while the project will undoubtedly alter the view of the water from both Trump and Flagler's property, the impact on view is not so significant as to constitute an unreasonable infringement of their riparian rights. Mr. Lemoine stated that he had a forty-foot trawler that he would like to dock in front of his property. He currently docks the boat at a marina twenty miles north of the Trump property. He prefers to bring his boat in stern first and enter slips oriented north to south. He indicated that he can drive his boat in five feet of water, but prefers six feet; however, he also testified that he has brought his boat directly up to the bulkhead in front of Trump, which is approximately a two- or three-foot depth. The witness has seen sailboats and other boats moored near the bulkhead over extended timeframes. Mr. Lemoine speculated that Trump might seek a dock, either alone or in conjunction with Flagler, but admitted that Trump has never applied for a dock permit. He stated that Trump has had discussions about the possibility of a dock over the last fifteen years and speculated that a dock plan might include anything from the purchase/lease of the City docks to a lease of Trump's riparian interests to a third party. By contrast, Trump resident and former Board member Dean Goodman indicated "the idea was to provide an amenity [for] a number of people that are in the building that are boaters." Mr. Goodman stated that he hoped to be able to have a boat in front of the building someday, but did not own a boat in Florida. Association president Dale McNulty explained that, while informal discussions have occurred regarding the possibility of a dock, no official action had been taken. Mr. McNulty characterized the dock plans as being "sort of in the land of wishful thinking." Mr. Pike, while acknowledging that both parcels would still be able to design a dock for their property, opined that the County's project unreasonably limited the size and configuration of the docks possible. Mr. Pike initially admitted that a safe navigation depth for a forty-foot boat, or even a sailboat, was four feet below mean low water (MLW), but stated that he would prefer to design a dock with an additional two-to- three feet of water below the four-foot draft to avoid propeller damage. However, Mr. Pike conceded that he has designed docks for boats in four feet below MLW and ultimately based his own calculations on an assumption of a four-foot draft and one-foot cushion, or five feet below MLW. Mr. Pike also opined that a north-south alignment for boat slips was a preferred slip orientation. Given the bathymetry in the area and the documented seagrasses, Mr. Pike estimated that twenty slips could be designed for the Flagler property, rather than the thirty-four slips provided for by the County Manatee Protection Plan. He thought that a design might accommodate thirty to thirty-two slips for Trump, rather than the forty-slips provided for by the County Manatee Protection Plan. Based on the limitation on number of slips and configurations, the witness opined that the County's project would unreasonably interfere with Trump and Flagler's ability to design a dock. He admitted, though, that the numbers derived from the County Manatee Protection Plan represent a maximum number, rather than a specified or guaranteed number. He further admitted that other agency limitations may further restrict Trump and Flagler's right to dockage. Without a permit application or plan from Trump or Flagler, County witness Robbins concluded that the most reasonable assumption was an owner-oriented facility designed for the building owners/tenants. The County introduced a graphic illustrating areas available for dock construction, with sufficient depth for 35- to 40-foot boats (-6 feet NGVD) and with no seagrasses present. Rule 18-21.004(4)(b)2. limits ownership-oriented facilities generally to forty square feet for each foot of riparian shoreline, giving Trump the ability to apply for a dock that preempted a maximum of 16,000 square feet, and Flagler a maximum of 14,000 square feet. Under the County Manatee Protection Plan, Trump would be limited to forty slips; Flagler would have the potential for thirty-four slips. Mr. Robbins testified that, in his experience, a minus five MLW is a common depth for docks, but that elevations as shallow as a minus four MLW could be used depending on the type of boats and the dock configuration. Mr. Robbins explained that, even with the County's project in place and factoring in the other limitations, Trump would still have 61,842 square feet of potential space within which to design a dock. Flagler would still have 41,481 square feet of potential space, even considering the need to retain a path for ingress and egress from the Trump parcel. A more detailed analysis of the seagrasses might make more square footage available for dock construction. Dr. De Gennarro also evaluated whether a dock could be designed to serve Trump and Flagler's parcels. The vessel owner statistics for the County indicate that at least ninety-five percent of the boats registered in the County are thirty-nine feet or less; consequently, Dr. De Gennarro focused on boats forty feet or less. Dr. De Gennarro considered the water depths and the existence of subaquatic vegetations and concluded that the graphic presented by Mr. Robbins was conservative, but still provided adequate space for both Trump and Flagler to construct appropriate dockage, allowing thirty-eight boats for Trump and thirty-two for Flagler of varying size. However, Dr. De Gennarro concluded that a dock design of forty slips for each would also be possible, depending on the size of the boats. Dr. De Gennarro proposed that a single, double-loaded parallel dock design would be a good layout for a potential docking facility in front of both Trump and Flagler's property that would be protected by the County's proposed islands, provide sufficient water depths, and provide an attractive facility. He specified, however, that the single, double-loaded parallel dock design was simply one of "many" that might work in the given space. Dr. De Gennarro explained that the existing dredge hole would not be a preferable location for either a mooring field or a dock because the deep muck-bottom would drive up the costs for either type of facility. Accordingly, Dr. De Gennarro concluded that the County's project would not foreclose or even substantially restrict the ability to locate a dock in front of Trump and Flagler’s property. The more persuasive evidence supports a finding that neither the right of ingress/egress nor the right to boat in the vicinity is unreasonably infringed upon by the County's project. Trump and Flagler will continue to have reasonable access to navigation. The northerly approach preserved by the County's project will allow for boat traffic to safely navigate in the area. While the southerly and easterly approaches are eliminated by the County's plan, the evidence indicates that the two approaches were less preferable than the northerly approach because of the presence of shoals. Based on the above considerations, the County's project will not unreasonably infringe upon Trump or Flagler's qualified right to a dock. The fact that the project might preclude the design and permitting of a dock that would host very large vessels does not mean that Trump and Flagler's rights regarding docking have been unreasonably infringed. The evidence shows that substantial docking facilities of multiple configurations are still possible even if the County's project is approved. In summary, the County's application for proprietary authorization should be approved. Other Contentions All other contentions raised by Trump and Flagler have been considered and are found to be without merit.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order approving the County's application for a consolidated ERP and consent to use sovereignty submerged lands. DONE AND ENTERED this 24th day of September, 2009, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September, 2009.