Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, T. DANIEL FARNSWORTH, ET AL. vs SUMTER COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 96-005917GM (1996)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Dec. 18, 1996 Number: 96-005917GM Latest Update: Sep. 20, 1999

The Issue Whether Comprehensive Plan Amendment 96-2 adopted by the County on September 24, 1996, is in compliance.

Findings Of Fact Based upon all of the evidence, including the stipulation of counsel, the following findings of fact have been determined: Background The parties Respondent, Sumter County (County), is a local government subject to the comprehensive land use planning requirements of Chapter 163, Florida Statutes. Respondent, Department of Community Affairs (DCA), is the state land planning agency charged with the responsibility of reviewing comprehensive land use plans and amendments made thereto pursuant to Part II, Chapter 163, Florida Statutes. Petitioners, T. D. Farnsworth, Russell E. Weir, Jack Burchill, Linda Latham, and Terry Forsman, own property and reside within Sumter County. Petitioner, Sumter Citizens Against Irresponsible Development, Inc. (SCAID), is an organization founded by a small group of citizens for the purposes of preserving the "rural lifestyle" of the county, preventing urban sprawl, and ensuring "that development will not be a burden to the taxpayers" of the County. Farnsworth is president of the group. By stipulation of the parties, Petitioners are affected persons within the meaning of the law and have standing to bring this action. Intervenor, Pringle Communities, Inc. (Pringle), is a Florida corporation and the potential developer of the subject property of this proceeding. Pringle submitted oral and written comments during the plan amendment review and adoption proceeding and thus has standing as an affected person to participate in this proceeding. The amendment On May 13, 1996, the County adopted plan amendment 96A01 by Ordinance No. 96-17. On November 7, 1996, the DCA published a Notice of Intent to find the amendment in compliance. Amendment 96A01 amended the Sumter County Comprehensive Plan's (the Plan) Future Land Use Map (FLUM) to revise the land use designations on approximately 510 acres of land. Specifically, the plan amendment converted the land use designation for the Pringle parcel from an Agricultural to a Planned Unit Development (PUD) land use, limited to 499 residential units. The plan amendment also revised the FLUM by extending the Urban Expansion Area to include the Pringle parcel and an adjacent parcel immediately to the north of the Pringle parcel, which had apparently been inadvertently omitted from the Urban Expansion Area in the final draft of the Plan. The data and analysis accompanying the amendment included a compatibility and land use suitability analysis, a soils analysis, an evaluation of urban sprawl related to issues, a preliminary environmental assessment, a population and housing analysis, a concurrency analysis, building permit information and analysis, and an analysis to ensure that the amendment was consistent with the adopted comprehensive plan. The data and analysis submitted up until the time the DCA issued its Notice of Intent to find amendment 96A01 in compliance, and at the final hearing, collectively demonstrate that the amendment is appropriate for the designated area. Is the Plan Amendment in Compliance? Petitioners have alleged the amendment is not in compliance for the following reasons: (a) the amendment fails to protect agricultural lands; (b) the amendment encourages urban sprawl; (c) the future land use map fails to reflect the goals, objectives, and policies of the Plan; (d) there is no demonstrated need for 510 acres of PUD land use; (e) the amendment does not demonstrate compatibility with adjacent agricultural and rural residential land uses; (f) the amendment does not provide for concurrency for adopted levels of services pursuant to the Plan; (g) the amendment does not comply with stormwater and drainage requirements of the Plan; (h) the amendment fails to satisfy the capital improvements element of the Plan; and (i) affordable housing needs are not met. These contentions will be discussed separately below. Protection of agricultural lands Under the amendment, 510 acres of land designated on the FLUM as agricultural land use will be converted to urban type uses. Petitioners contend that the amendment fails to protect agricultural land as required by Plan Objective 7.1.2 and Rule 9J-5.006(5)(g)5., Florida Administrative Code. The cited objective "establishes agriculture as the primary use outside of the urban expansion area" and "insure(s) retention of agricultural activities." If the plan amendment fails to adequately protect adjacent agricultural areas, the cited rule considers this failure to be one of the thirteen primary indicators that the amendment does not discourage the proliferation of urban sprawl. The rule and objective do not prohibit the conversion of agricultural lands to urban uses. Indeed, Plan Objective 7.1.2 and the corresponding policies allow for the conversion of suitable agricultural lands as the need for additional urban land is demonstrated. The policies also require that the conversion be done in a well planned, orderly, and logical fashion based on need and suitability. The agricultural lands being converted to urban land uses as a result of the plan amendment are appropriate for conversion. The Plan designates the Pringle parcel as an area appropriate for urban development. This determination was based on an extensive analysis of various factors including soil suitability, environmental constraints, and other planning criteria such as proximity to existing urbanized areas. In fact, the Plan contains a series of maps which specifically locate agricultural areas appropriate for conversion to urban uses, and the Pringle parcel is located within such designated areas. The evidence establishes that the conversion of agricultural land contemplated by the plan amendment was justifiable because of the extent of urban development already existing in the area and the requirement within the Plan that infrastructure be in place concurrent with development. In addition, future populations will be directed away from the remaining agricultural lands throughout the County and to the development proposed by the plan amendment. The open space required by the PUD will also serve to buffer and ensure compatibility of land covered by the plan amendment and the adjacent agricultural and rural lands. Because Rule 9J-5.006(5)(g)5., Florida Administrative Code, deals exclusively with "adjacent" agricultural land, the conversion of any agricultural uses on the Pringle parcel is not relevant to the cited rule. The Plan requires the County to retain a minimum of ninety percent of its land area in rural (agriculture, timberland, and vacant) and conservation land use. The County has no "mining" zoning or land use designation, but includes mining as an agricultural use. Including the land covered by mining permits in the County, more than ninety percent of the County's land area is maintained in rural (agriculture, timberland, and vacant) and conservation land use, even after the adoption of the amendment. In view of the above, Petitioners have not shown to the exclusion of fair debate that the plan amendment fails to protect agricultural land, either on or adjacent to the Pringle parcel. Urban sprawl In the same vein, Petitioners contend that the amendment fails to discourage urban sprawl because it converts 510 acres of agricultural land to urban uses. In support of this contention, they cite a number of provisions within Chapter 9J-5, Florida Administrative Code, all dealing with urban sprawl, which have allegedly been violated. Petitioners also allege the multiplier for the plan amendment is in excess of 1.25, which is an indicator of urban sprawl, and no future public facilities and services are planned for the lands covered by the amendment prior to its adoption. The plan amendment includes an evaluation of urban sprawl. That evaluation references Plan Policy 7.1.2.5(a), which was adopted by the County specifically as a mechanism for discouraging urban sprawl. A review of that policy indicates that, for a PUD to be allowed in an agricultural land use area, it must score at least 50 points, applying a point system based on factors including, but not limited to, proximity to the urban expansion area, proximity to urban services, including water, sewer, and roads, and proximity to other services such as fire protection and emergency medical services. If a proposed amendment or PUD fails to score 50 points, it is deemed to encourage urban sprawl and would not be approved by the County. Amendment 96A01 scored 100 points, well in excess of the 50-point threshold. While the point system does not apply directly because the amendment alters the Urban Expansion Area to include the Pringle parcel, it is evidence that the amendment does not fail to discourage urban sprawl. In addition to satisfying Plan Policy 7.1.2.5.(a), the plan amendment is consistent with Future Land Use maps VII-18a and VII-18c, which are the future land use constrained area overlay and urban sprawl evaluation overlay, respectively. As the Plan data and analysis indicate, these maps were prepared for the purpose of directing urban development into areas most suitable for such development. Map VII-18a demonstrates that the land included in the plan amendment has only slight limitations in regard to urban sprawl. If the amendment allows a strip development, this is another of the thirteen primary indicators that an amendment may fail to discourage urban sprawl. The evidence shows, however, that the subject property is not a strip development because it is not a linear development that runs parallel to a highway. Finally, the PUD mixed land use category adopted by the plan amendment is a planning method specifically recognized by Rule 9J-5.006(5)(1), Florida Administrative Code, as a method of discouraging urban sprawl. Indeed, the rule provides in part that: mixed use development . . . will be recognized as [a method] of discouraging urban sprawl and will be determined consistent with the provisions of the state comprehensive plan, regional policy plans, Chapter 163, Part II, and this chapter regarding discouraging the proliferation of urban sprawl. Because the PUD adopted by the amendment is designed to provide a mix of land uses, the amendment does not fail to encourage an attractive and functional mix of uses. Given the above, it is found that Petitioners have not shown to the exclusion of fair debate that the plan amendment encourages urban sprawl. Demonstrated need and adequate data Petitioners allege the plan amendment "fails to provide demonstrated need" as required by various provisions within Chapter 9J-5, Florida Administrative Code. They further allege amendment 96A01 "is not based upon adequate surveys, studies, or data regarding the amount of land needed to accommodate anticipated growth." Initially, it is noted that the data and analysis in the plan are not subject to the compliance review process. Section 163.3177(10)(e), Florida Statutes, authorizes the DCA in a compliance review to determine only if the plan or plan amendment is based on appropriate data and analysis and whether the data was collected in a professionally acceptable manner. Planning methodologies used in analysis of the data, such as the calculation of a multiplier, must also be prepared in a professionally acceptable manner. Demonstrated need is only a subset of one of the thirteen primary indicators that an amendment or plan may fail to discourage urban sprawl. Rule RJ-5.006(5)(g)1, Florida Administrative Code, lists as one of the thirteen indicators whether the amendment: [p]romotes, allows or designates for development substantial areas of the jurisdiction to develop as low-intensity, low-density, or single-use development or uses in excess of demonstrated need. (Emphasis added) The thirteen primary indicators are evaluated as a whole, not as a "one strike and you're out" list, to determine one aspect of compliance -- whether the amendment fails to discourage the proliferation of urban sprawl. "Multipliers" are a planning tool generally utilized by professional planners to aid in determining the need for additional allowable densities. Multipliers are generally expressed as a percentage or ratio of the estimated population in a given time period compared with the total residential units allowed by the comprehensive plan. For example, a multiplier of 2.0 would mean that, over the particular planning time frame, there existed twice as many residential units allocated as the population projections estimated would be utilized. At hearing, Petitioners raised issues concerning the methodology used in calculating the County's residential land use allocation multiplier and contended (a) seasonal population and planned federal prison expansions contained within the approved Plan were in error and therefore should not be used to support the amendment; (b) the agricultural land use acreage should be included in the multiplier calculation; and (c) the PUD maximum allowable density of eight units per acre should be used to calculate the multiplier rather than the approved density of just under one unit per acre. The preparation of the multiplier in issue came as a result of the DCA's Objections, Recommendations, and Comments (ORC) report and preparation for the hearing in this matter. The ORC report recommended that the County provide data and analysis which demonstrated that the land use change requested in the plan amendment was based on the amount of additional land needed to accommodate the projected population. Based on historic data, the County utilized a multiplier which had been calculated in 1995 in Case No. 94-6974GM, judicial recognition of which was taken in this hearing. In that case, the multiplier depicted the allocation of residential land countywide. The multiplier was 1.87, which means that the County allocated residential land uses approximately eighty-seven percent above its demonstrated need for the planning period. The evidence shows that, in order to allow some degree of development flexibility, a local government will routinely allocate more land than is actually needed. Indeed, a multiplier of 1.87 is low when compared to the other multipliers found in compliance in adjacent local governments as well as in other local governments statewide. In an effort to provide a more accurate multiplier, prior to the hearing, utilizing data available when the amendment was adopted, the County recalculated the multiplier and determined the updated multiplier to be 1.3. The County's calculation of a multiplier excludes agricultural land from consideration, in order to protect agricultural lands as required by the Plan. In some rapidly urbanizing jurisdictions vacant land labeled agricultural or rural on a future land use map may simply be future development land. However, the County has as one of its primary land use goals to protect agricultural land. To include agricultural land use acreage in the multiplier calculation could lead to an under- allocation of density which would jeopardize agricultural land by encouraging development in the very areas the plan is designed to protect. The DCA has utilized multiplier calculations in other counties that do not include agricultural lands. Therefore, because of the unique situation of the County and its land use plan's emphasis on protecting agricultural land, in this case it is professionally acceptable to exclude agricultural land from the multiplier calculation. In the County, PUD is a land use category rather than merely a zoning category as in many other jurisdictions. The effect of that designation is to limit the density of the development by land use designation to 499 units. Any increase in the density or intensity of the development would require a land use plan amendment. Consequently, when calculating the multiplier, the density approved for this PUD (499 units) should be utilized rather than the PUD maximum allowable density of eight units per acre. Petitioners developed a multiplier of their own of 4.1. However, they failed to show that the County's multiplier was not developed in a professionally acceptable manner. Intervenor's marketing scheme for its residential developments is directed at persons moving to Florida from other states. Intervenor plans to use the same marketing scheme for the Pringle parcel, and most residents are not expected to be from the County. The proposed development, along with the Villages development in the northeast section of the County, which is subject to age restrictions which limit its availability to families, is a new type of development for the County. This new population was not taken into account in the original comprehensive plan which also had a low multiplier. Therefore, the need for residential allocation for this new population was not addressed. Between 1992 and 1996, the federal prison facility located near the Pringle property hired new employees, many of whom relocated from outside the area. However, the vast majority of these immigrants located outside of the County because of a lack of available appropriate housing. The federal prison facility is to be expanded in the near future, with the next phase to employ approximately 250 new employees. This expansion has already been funded by the federal government. Although the federal prison and its expansions were contemplated as part of the Plan adoption process, the impact of the federal prison and its expansions were not included in the population projections as calculated in the Plan. The seasonal population of the County was not included in the Plan's population projection. Rule 9J-5.005(2)(e), Florida Administrative Code, requires both resident and seasonal population estimates be used to determine population estimates for plan and plan amendment purposes. Therefore, the seasonal population estimate and the impact of the federal prison should be included in determining need. Given these considerations, Petitioners have not shown to the exclusion of fair debate that the plan amendment was not based on a demonstrated need, or was not adequately supported by data and analysis. Compatibility with adjacent agricultural lands Petitioners have also alleged the County has not demonstrated compatibility with adjacent agricultural and rural residential land uses. The Plan allows for the well planned conversion of agricultural lands in the County. One of the requirements of the Plan's PUD provisions is that PUD development be buffered from adjacent lands and contain open space. The purpose of this provision is to ensure compatibility. A review of the PUD application and Master Development Plan, both incorporated into the plan amendment, shows that the Pringle development will provide approximately 225 acres of open space. Much of this open space, as required by the Plan, will act as a buffer between the development and the adjacent agricultural and rural land uses. The project will also cluster its development, which serves to separate the more urban development from the adjacent agricultural and rural uses. In view of these considerations, it is found that Petitioners have not shown to the exclusion of fair debate that the plan amendment is incompatible with adjacent agricultural land uses. Level of services In their Petition, Petitioners assert that amendment 96A01 violates Plan Objective 7.1.6, Policy 7.1.6.1, Objective 8.1.1, and Policy 8.1.1.1, Rules 9J-5.005(3), 9J-5.011(2)c., and 9J-5.015(3)(b)1., Florida Administrative Code, and Section 187.201(16)(b)6., Florida Statutes, pertaining specifically or generally to levels of service for recreational facilities, schools, fire protection, emergency medical services, stormwater, and flooding. The stated policies and rules require adoption and adherence to specific levels of service prior to development of land. The amount of facilities required is based on population. Under the Plan, the County must take the necessary steps to insure the availability of these facilities. The development order in this case also requires the developer to provide for adequate public facilities. Petitioners offered no testimony, exhibits, or evidence regarding the following: Plan Objective 7.16, as alleged in paragraph 15.F. of their petition; Objectives 4.4.1, 4.5.1, and 4.5.2, and Policies 4.4.1.1, 4.4.1.2, 4.4.1.3, 4.5.1.2, and 4.5.2.1, as alleged in paragraph 15.G of their petition; Objective 8.1.1, as alleged in paragraph 15H of their petition; and Objective 1.3.5, as alleged in paragraph 15.I of their petition. Petitioners also specifically stated they are not contesting any issues regarding flooding. In view of this lack of presentation of evidence, Petitioners have failed to show to the exclusion of reasonable debate that the plan amendment is inconsistent with any of the above Plan Objectives and Policies.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Community Affairs enter a Final Order determining Plan Amendment 96-2 adopted by Sumter County by Ordinance Number 96-17 on September 24, 1996, to be in compliance. DONE AND ENTERED this 26th day of February, 1998, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 26th day of February, 1998. COPIES FURNISHED: James F. Murley, Secretary Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 Jane M. Gordon Environmental and Land Use Law Center 3305 College Avenue Fort Lauderdale, Florida 33314 T. Daniel Farnsworth 12364 County Road 223 Oxford, Florida 34484 Kathleen R. Fowler, Esquire Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 Felix M. Adams, Esquire 236 North Main Street Bushnell, Florida 33513-5928 Jimmy D. Crawford, Esquire Post Office Box 492460 Leesburg, Florida 34749-2460 Stephanie Gehres Kruer, Esquire Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100

Florida Laws (5) 120.569163.3177163.3184163.31917.16 Florida Administrative Code (2) 9J-5.0059J-5.006
# 2
BOARD OF PROFESSIONAL LAND SURVEYORS vs. DENNIS HEASLEY, 84-000640 (1984)
Division of Administrative Hearings, Florida Number: 84-000640 Latest Update: Oct. 17, 1986

Findings Of Fact At all times pertinent to the allegations involved in this administrative hearing, the Respondent, Dennis Heasley, was a licensed land surveyor having been issued license number LS 3466 by the State of Florida. In January 1981 Respondent was an employee of James Bushouse and Associates, a land surveying firm. On January 31, 1981, MidSouth Engineering (MidSouth), a licensed land surveying company, entered into a contract with Figg and Muller Engineers, Inc., and the State of Florida, Department of Transportation, to provide engineering and land surveying services for the new Sunshine Skyway Bridge project. On June 10, 1981, MidSouth entered into a contract with Bushouse for Respondent, Heasley, and other Bushouse employees to perform some of the land survey services called for in the contract MidSouth had with the Department of Transportation. Thereafter, MidSouth entered into an agreement with Respondent Heasley and one Jorge R. Saniz providing that, for a fee of $200,000.00 Heasley and Sainz would provide land surveying and consulting services to MidSouth for its work under its state contract. On or about June 26, 1981, Heasley and Sainz began their work under the agreement with MidSouth, and the work called for by the agreement was satisfactorily completed by July 31, 1981. Thereafter, Heasley billed MidSouth for the unpaid remainder of the contract price and was paid. The contract between MidSouth and the State of Florida provided for payment by the State based on crew day rates wherein the State would pay so much money per crew day expended. The work in issue here was to take no more than 85 crew days with an upper limit on payment to be approximately $300,000.00. Respondent actually completed the work in 34 days. His speedy completion of the job resulted in MidSouth receiving less under its contract than anticipated. Shortly after completion, he became an employee of MidSouth. In the course of his continuing employment, he worked on some other aspects of the bridge project that were awarded to MidSouth. Respondent's lump-sum contract with MidSouth called for payment to him of $200,000.00. Out of that sum he was supposed to pay all his and Sainz' job expenses which included the salary, housing, and feeding of the employees he hired to perform the actual surveying work. His understanding with MidSouth called for him to utilize approximately 12 to 16 crew members. During the time the work was being performed, Respondent and Mr. Sainz rented a house near the work-site in which crew members were provided a place to live. Food paid for by Respondent Sainz was provided as were laundry facilities. The sums paid for these items as well as the transportation of the workers and the worker's salaries were to come from the $200,000.00 fee paid by MidSouth. Payments were made on the basis of periodic draws. Either Heasley or Sainz would contact MidSouth and state that some money was required for expenses and a sum was furnished. As this sum was expended Respondent would ask for more. He indicates that the relationship was like a game in that he asked for as much as he thought he could get and MidSouth would pay as little as it thought it could get away with. In any event, no actual per diem monies were paid by Respondent to the employees who were working on the survey crew. Respondent admits that during the 34 days this arrangement was in effect, he kept very few records and receipts. He relied on MidSouth to keep all the expense records and whatever receipts he received for money spent, he sent in to MidSouth which made up the payroll for Heasley and Sainz' crew members from the times he called in. Several months after the subcontract between Heasley, Sainz, and MidSouth was completed, Heasley was called by Tom Heinly, Executive Vice- President of MidSouth and his immediate supervisor, with a request that he, Heasley, prepare, sign and submit a list of per diem expenses for the crew which worked on the contract referenced above. In the course of the conversation, Heinly asked that it be prepared a certain way. In response, Respondent told Heinly that he could not do that because he had not paid the money as per diem payments but had provided payment in kind in the form of food, lodging, and laundry. Heinly advised Respondent to think about it and later called back again asking that Heasley prepare and sign a statement indicating per diem money paid. Heinly argued that MidSouth was entitled to the money and asked that Heasley do this as a favor. Again, Heasley refused. The third time Heinly called Heasley, he indicated that the list would be strictly a memorandum between Heasley and MidSouth to account for some of the money advanced by MidSouth and that the list had nothing to do with the State. Heinly assured Heasley that the improper, inaccurate list would not go to the State since this was one of Heasley's concerns. Heinly indicated that he had talked with representatives of the State and had been assured that it was legitimate to file an invoice such as this. Heasley was led to believe that the State would not reimburse MidSouth for advances made for in-kind payments but would reimburse for actual per diem expenses. Ultimately, since Heasley was convinced by Heinly that MidSouth was entitled to be reimbursed for these monies and since, to the best of his recollection, he, Heasley, had paid out in in-kind expense a sum similar to that claimed on the per diem list, it would be all right to so certify. Therefore, he agreed to sign the list after the third request. The list which Heasley signed was prepared by MidSouth personnel, not Heasley, and was brought to Heasley by Mr. Duffer, MidSouth's chief accountant. Respondent does not recall going over the list at the time he signed it and verified neither the names nor the amounts set out thereon. When he checked it over much later, he found that some of the names on the list should not have been there. Respondent admits signing the document and admits that the document as signed was false. When investigators from the State Attorney's Office initially talked with Mr. Heasley about this incident he was less than forthright. Though they had advised him they were investigating the relationship between MidSouth and the Department of Transportation, the tenor of their questions indicated to him that they were investigating him and his answers were evasive and, in fact, erroneous. However, when he subsequently found out the nature of the investigation, he attempted to get word to the investigators that he would like to continue the discussion. He was unable to do so, however, and was not interviewed by these officials again. He was, however, subsequently interviewed by Mr. Cartwright who, in mid to late 1981, was conducting an investigation into the MidSouth, Heasley and Sainz relationship with the Skyway Bridge project. An engineer with the State had expressed some concern regarding invoices submitted by MidSouth and the preliminary inquiry showed some cause for concern. As a result, a full investigation was begun which revealed that MidSouth had little if any documentation to cover invoices submitted to the State. It also showed that the company's accounting procedures and internal control were almost nonexistent. As a part of the investigation Cartwright interviewed Heasley who admitted that he had signed the documents referred to above regarding per diem payments. Heasley also admitted that in some cases the payees did not receive the money claimed but in his opinion, the bottom line balanced out and MidSouth was entitled to the total sum.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that Respondent, Dennis Heasley's license as a land surveyor in the State of Florida, be placed on probation for a period of two years, under such terms and conditions as shall be established by the Board of Land Surveyors, and that he be reprimanded and pay an administrative fine of $1,000.00. DONE AND ENTERED this 16th day of January 1985 in Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of January 1985. COPIES FURNISHED: Joseph W. Lawrence, II, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 E. C. Deeno Kitchen, Esquire Melissa Fletcher Allaman Post Office Drawer 1170 Tallahassee, Florida 32302 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Allen R. Smith, Jr. Executive Director Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (4) 2.01455.227472.031472.033
# 3
IN RE: SEMINOLE ELECTRIC COOPERATIVE SEMINOLE GENERATING STATION UNIT 3 POWER PLANT SITING APPLICATION NUMBER PA 78-10A2 vs *, 06-000929EPP (2006)
Division of Administrative Hearings, Florida Filed:Palatka, Florida Mar. 16, 2006 Number: 06-000929EPP Latest Update: Aug. 03, 2007

The Issue The issue to be resolved in this portion of this power plant site certification proceeding is whether the site for the proposed Seminole Generating Station Unit 3 Project is consistent and in compliance with the applicable land use plans and zoning ordinances of Putnam County, Florida, pursuant to Section 403.508(2), Florida Statutes.1

Findings Of Fact SECI is a member-owned generation and transmission electric cooperative. SECI supplies power to ten electric cooperative members throughout Florida. These cooperatives primarily serve rural areas of the State. SECI's members currently serve approximately 1.6 million customers throughout the State. SECI's headquarters are in Tampa, Florida. SECI first came into existence in 1948 under the Federal Rural Electrification Act to provide electric power to rural areas. Initially, SECI purchased power from other utilities for its individual members. In the 1970s, in response to the oil embargo, SECI's member cooperatives determined it was in their best interest to build their own power supply. SECI then licensed, constructed, and commenced operation of the coal- fired power plant near Palatka, in Putnam County. SECI also has a power plant in Hardee County, Florida. These two power plants allow SECI to provide approximately 70 percent of the power for the member cooperatives, while purchasing 30 percent of the power needs of the member cooperatives from other utilities. The Site is located in the unincorporated area of the county. It is approximately five miles north of the city of Palatka. The St. Johns River is located to the south and to the east of the power plant site. The Site is a 1,300 megawatt facility located on a site comprised of two parcels of land totalling approximately 2,000 acres in size. The larger parcel of the site, which contains the existing coal-fired Units 1 and 2 and almost all related facilities, began operation in 1984. Other existing facilities on the larger parcel include: two boiler buildings and the turbine generator buildings; precipitators, scrubber modules, and a combined flue stack; two natural draft cooling towers; a coal yard for unloading and storage of coal; an A-frame storage building for limestone used in the scrubber process; a rail spur and rail loop used to bring coal into the Plant site; and a coal conveyor to bring the coal from the coal yard to the boilers. The new Unit 3 will be constructed on this larger parcel. The balance of the larger parcel of the Site is in pine flat woods. North and northwest of the power plant is the Lafarge wallboard facility, where combustion by-products from the existing units are converted into synthetic gypsum for the manufacture of wallboard. The Site also includes a smaller parcel of approximately 4.5 acres located approximately 1,000 feet to the south along the St. Johns River. An intake pump house is located on this parcel to pump water from the river for use by the existing units. Currently, there are four underground pipes (one of which is not in use) and an underground duct bank with electrical conduit. The underground pipes and duct bank continue from the smaller parcel to the larger parcel through an existing privately-granted easement. The Site and the existing two steam electric generating units, Units 1 and 2, were certified in proceedings under the PPSA that took place in 1978 and 1979. In 1978, when the Site initially was being developed and certified under the PPSA, Putnam County was in the process of developing its Comprehensive Plan and its Future Land Use Map (FLUM). However, the County had zoning regulations in place, and it and rezoned the larger and smaller parcels as a PUD for the purpose of an electrical generating facility. During the 1978 land use hearing, which also addressed the pipeline easement which provides access to the St. Johns River, the Hearing Officer concluded that the Site was consistent and in compliance with the land use plans and zoning regulations in effect at that time. The Siting Board subsequently adopted the Hearing Officer’s conclusions regarding land use and zoning issues. In its Order Relating to Land Use and Zoning, entered on March 21, 1979, the Siting Board determined that the Site, including the intake pump house and pipeline easement, was consistent and in compliance with the land use plans and zoning ordinances of Putnam County. In the Order Relating to Land Use and Zoning, the Siting Board also ordered the “responsible zoning and planning authorities . . . to refrain from hereafter changing such land use plans or zoning ordinances so as to affect the proposed site.” IN RE: Seminole Electric Cooperative, Inc., Application for Power Plant Site Certification, Putnam County, DOAH Case No. 78-1388, 1979 Fla. ENV LEXIS 10 (Siting Board Mar. 21, 1979. Sierra Club was a party to the original site certification proceeding and is bound by its determinations on consistency with land use and zoning. SECI is proposing to construct a new Unit 3 at the Site designed for a capacity of 750 megawatts. The new unit and related facilities are much like the existing facilities and will utilize many of the existing onsite facilities. Like the two existing units, the new Unit 3 will burn coal as its primary fuel with up to 30 percent petroleum coke. The new unit will consist of a turbine generator building, a new boiler building, precipitators, scrubber modules, and a wet electrostatic precipitator. A single flue gas stack will serve the new unit. A new mechanical draft cooling tower will also be constructed on the site to serve the new Unit 3. The new cooling tower will have a lower profile than the existing natural draft cooling towers. The existing coal yard will be expanded for the new unit and additional facilities will be added in the limestone scrubber area to handle the additional gypsum that will be created. Construction for the new Unit 3 is planned to begin in late 2008. As planned, the new unit is expected to start up in May 2012. SECI's Unit 3 project will integrate the new unit into the existing plant facilities. The existing administration building and parking lot will support the new unit. SECI will continue to use the existing rail spur, including for the delivery of coal and construction materials. The existing switchyard and transmission area will be utilized for the new unit. There will be no new off-site electrical transmission lines for the Unit 3 Project. The existing plant access off Highway 17 will be improved to enhance access for turning vehicles into the site. As indicated, the existing units are supplied with cooling and other service water from the St. Johns River. SECI proposes to utilize the existing pump house and to install an additional water pipeline and duct bank within the easement to supply primarily cooling water and also other service water (primarily for bottom ash handling and for the scrubber system) to the proposed Unit 3. There will be some enhancements to the pumps and motors inside the pump house to increase the capacity of water withdrawals. Otherwise, there will be no changes to the existing pump house for the new Unit 3 project. The cooling and other service water for Unit 3 will be conveyed to the main power plant site by an additional 36-inch pipeline to be placed underground and within the existing private easement. As indicated, the existing easement was created in 1978 and the existing pipelines were installed as part of the development of Units 1 and 2. A second duct bank will also be placed in the existing easement. There will be no facilities constructed above the ground surface within that easement. The easement will be restored to its existing condition after the new water pipeline is installed. The existing land uses adjacent to the Site are primarily undeveloped land. Residential areas along the St. Johns River are the closest development to the Site, with the exception of the Lafarge gypsum plant located adjacent to the larger parcel of the Site. The closest communities are Bridgeport, which is located approximately 3.5 miles to the east, and Bostwick, which is located 2.5 miles to the north. The pattern of development in the area since the existing Units 1 and 2 began operation in 1984 has been single family residential development located along the river and the construction of the Lafarge wallboard plant. With the exception of the wallboard plant, the areas between that residential corridor and the Site, as well as in all four directions around the site, continue to be undeveloped land. There are two existing homes located near the Site. One home is located approximately one mile south of the proposed Unit 3 stack, and another home is approximately one mile west of the Plant site. There is existing power plant infrastructure between the Unit 3 site and those two nearest residences, including the large natural draft cooling towers, wastewater treatment equipment, and other associated facilities. The addition of the proposed Unit 3 would be compatible with the existing land uses at and near the Site. The new Unit 3 will have very similar operating characteristics to the existing units, but will use additional air emissions controls. The residential development along the St. Johns River has continued while Units 1 and 2 have operated. The new Unit 3 will be able to co-exist with existing land uses in that the new Unit 3 is not expected to have a significant adverse impact to nearby residential development. When its Comprehensive Plan with FLUM was adopted (after the Siting Board’s March 1979 Order Relating to Land Use and Zoning), the County designated the larger parcel in the Industrial Future Land Use category to recognize the existing Units 1 and 2 at the site. Electrical power plants are an allowed use in the Industrial future land use category. Approximately two-thirds of the smaller parcel of the site fronting on the St. Johns River was designated Agricultural II and approximately one-third (the part contiguous to the river) was designated Rural Residential under the County’s Comprehensive Plan and FLUM. The existing pump house is located on the Rural Residential part of the parcel. The underground water pipes and electrical duct bank lead from the pump house towards the larger parcel of the Site, which is designated Industrial. The existing pump house and underground water pipes and electrical duct bank are allowed uses in both the Agricultural II and in the Rural Residential future land use districts, as a Type 2 Community Facility. The underground water pipes and electrical duct bank proceed from the smaller parcel to the larger parcel of the Site through a privately-granted easement across property designated Agricultural II on the County’s FLUM. The County’s Comprehensive Plan does not prohibit such facilities in that land use designation. The lands in the pipeline easement are zoned Agricultural. Such facilities also are not precluded in that zoning district. The installation of the existing underground water pipes and electrical duct bank within the easement was approved by Putnam County at the time of the original site certification proceeding for the Site. In October 1978, the Putnam County Code Administrator stated that the County’s zoning for the lands covered by the easement to the St. Johns River did not preclude the use of the easement for the pipeline installation. On January 10, 2006, the Putnam County Commission adopted Ordinance 2006-02, which amended the original PUD zoning approval for the Site. The amended PUD zoning ordinance covers both parcels of the Site. This amended PUD zoning ordinance allows the placement of Unit 3 and its related facilities within both parcels of the Site. The PUD zoning ordinance incorporates a Development Agreement between Putnam County and SECI, which addresses the Unit 3 facilities proposed to be constructed by SECI. As part of the PUD zoning amendments, the Putnam County Board of County Commissioners reviewed SECI's Unit 3 Project for consistency with the County’s Comprehensive Plan. The Commission found the Project to be consistent with the County’s Comprehensive Plan. More specifically, Ordinance No. 2006-02 found that SECI’s proposed amendment to the PUD zoning was “consistent with the Comprehensive Plan,” would “not adversely affect . . . orderly development,” met “the requirements of the Land Development Code,” and “will not be placed in agricultural lands.” (SECI Exs. 12B, 13A, and 13B) The Development Agreement incorporated into Ordinance No. 2006-02 acknowledges that the existing pipeline easement “is not a part of the PUD.” The Development Agreement clearly differentiated between underground pipelines and other aspects of the Unit 3 Project: The existing pipeline easement, which is not a part of the PUD, runs across property zoned for agricultural uses and falling [sic] within the Agricultural II future land use category. Neither the County Comprehensive Plan nor the Land Development Code precludes the repair, replacement or addition of underground water pipes necessary to plant operations. The underground pipes, and the pipeline easement, were part of the original certification and any modifications required to accommodate Unit 3 will be reviewed as part of the site certification process. Subject to site certification under the PPSA, Unit 3 will be constructed primarily east of, but integrated with, existing Units 1 and 2 such that any new development activity will fall within that portion of Parcel 1 designated under the Industrial future land use category. But for the existing pump house, Parcel 2, which is part of the PUD, will remain undeveloped. Pumps within the existing pump house will be replaced or upgraded and existing underground water pipes may be replaced or upgraded, and new underground pipes may be added, but no new uses or structures are intended for Parcel 2. The pipeline easement – which is not part of the PUD – will remain undeveloped although pipes may be repaired, replaced (or additional pipes installed) underground between Parcels 1 and 2. Although no new uses or above-ground structures are anticipated on Parcel 2 or the pipeline easement, both are considered to be part of the electrical power plant to be certified under the PPSA and will be reviewed along with Parcel 1 throughout the State site certification process to which the COUNTY shall be a party. (SECI Ex. 13B, pp. 5-6) Sierra Club participated in the Putnam County January 2006 zoning hearing on the amended PUD zoning for the Site. The Sierra Club did not object to the adoption of the amended PUD zoning ordinance at that hearing. No party has appealed the Putnam County Commission’s amended PUD zoning ordinance for SECI's Unit 3 Project. Sierra Club is now bound by the determinations of land use and zoning consistency in these prior proceedings, as well as in the original site certification proceeding. Putnam County entered into a Stipulation with SECI which addresses land use and zoning issues. In the Stipulation, Putnam County acknowledged that the adoption of Putnam County Ordinance 2006-02, which amended the PUD zoning for the Site, and the approval of the Development Agreement referenced in that Ordinance by the Putnam County Board of County Commissioners, both confirm that the Site, including the proposed Unit 3 and the associated facilities, are consistent and in compliance with applicable land use plans and zoning ordinances as required under Section 403.508(2), Florida Statutes. Despite its participation in both the 1979 site certification proceeding and the 2006 re-zoning process, Sierra Club nonetheless takes the position in this case that the pump house and cooling water pipeline are “industrial” facilities which are not consistent with the future land use designations for the lands occupied by those facilities. Putnam County has adopted a definition of “development” that provides in pertinent part: The following operations or uses shall not be taken for the purposes of this act [the County’s land development code] to involve ‘development’: (b) Work by any utility and other persons engaged in the distribution or transmission of gas or water, for the purpose of inspecting, repairing, redoing, or constructing on established rights-of-way any sewers, mains, pipes, tables, utility tunnels, power lines, towers, poles, tracks or the like. Putnam County’s Land Development Code, Article 12, Section 12.01.01.a.2. This definition of “development” also applies to actions “seeking legislative action to amend this Code and the Comprehensive Plan” of Putnam County. Id. The County’s definition of “development” therefore excludes the additional cooling water pipeline and duct bank within the established easement containing similar pipelines and duct bank between the principal power plant site and the riverside pump house. No Comprehensive Plan amendments or other zoning approvals would be required for those pipelines and duct banks as they are not “development” subject to the plan or the local land development code. Underground pipelines and electrical duct banks such as those proposed for SECI's Unit 3 project are not typically regulated as a land use. All developed areas have water and sewer pipelines that radiate through different zoning districts and that serve the users that subscribe to such water and sewer service. The practical effect of regulating such facilities as “development” could result in a spider web of land use and zoning classifications running wherever those facilities are placed. Even if it were to be concluded that the underground water pipes and electrical duct banks were "development" subject to Putnam County’s Comprehensive Plan, SECI's expert land planner testified without contradiction that they would be considered a Type 2 community facility as defined in the Comprehensive Plan: "Type 2 [Community Facilities and Services] are light infrastructure facilities, including but not limited to, water wells, water tanks, sewage pump stations, electrical substations, and water and wastewater treatment plants with a capacity of less than 500,000 gallons per day." Type 2 community facilities are allowed in all eleven of Putnam County’s Future Land Use categories. As indicated, the smaller parcel of the Site is zoned as a PUD that allows the activities proposed. The easement for the underground water pipes and electrical duct banks is zoned for Agriculture zoning. As indicated, use of the easement for the underground facilities has been approved by the County since 1978. Unrebutted testimony demonstrated that there will be no physical changes to the pump house itself, but only replacement of the pump inside with a larger one with more capacity, and that the additional underground water pipe and duct bank will not be visible, as the land will be restored to current conditions. Sierra Club offered no evidence contradicting Putnam County’s interpretation of its own Comprehensive Plan land development regulations; offered no evidence as to how the community could be adversely affected by the continued use of the pump house, with larger pump, and the addition of underground water pipes and duct bank in the existing pipeline easement; and offered no evidence that these facilities for the pumping and conveyance of river water to the plant site constitute “industrial” uses under the land use plans and zoning regulations of Putnam County.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Siting Board find, pursuant to Section 403.508(2), Florida Statutes, that the site for SECI’s Unit 3 and its related facilities, to be located in Putnam County Florida, as described by the evidence presented at the hearing, are consistent and in compliance with existing land use plans and zoning ordinances and site-specific zoning approvals of Putnam County. DONE AND ENTERED this 31st day of August, 2006, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of August, 2006.

Florida Laws (2) 403.5065403.508
# 4
BOARD OF PROFESSIONAL LAND SURVEYORS vs. NARCISO J. RAMIREZ, 85-000519 (1985)
Division of Administrative Hearings, Florida Number: 85-000519 Latest Update: Aug. 07, 1985

Findings Of Fact At all times relevant hereto, respondent, Narcisco J. Ramirez, held land surveyor license number LS0002779 issued by petitioner, Department of professional Regulation, Board of Professional Land Surveyors. Respondent currently operates a land surveying firm known as South Atlantic Services of Florida, Inc. located at 7350 Southwest 41st Street; Miami, Florida. Respondent received a two year degree in civil engineering from City College of San Francisco in 1969 and has worked for various firms as a land surveyor in the Miami area since 1971. He has been a registered land surveyor in Florida since July, 1975. In March, 1984, respondent was contacted by a real estate salesman and requested to perform a "boundary survey" and "sketch" of a parcel of land owned by one M. P. Smith McNiely. The land in question involved various lots, including Lots 23, 25-30, 34-36 and 38 located in a subdivision known as DeSoto Heights which lies adjacent to Southwest 304th Street, Southwest 105th Terrace, and Southwest 168th Street in Dade County, Florida, just north of the City of Homestead. The property was to be sold, and the survey was intended to assist the seller in determining a sales price on the property. Ramirez interpreted the request to mean that only a "preliminary sketch" would be initially done, and if requested by the owner, a "complete survey" would be performed at a later date. He was paid $650 for the initial work, and expected an additional fee of $2,500 to $3,000 for the complete survey. According to Ramirez, a preliminary sketch is not as accurate as a complete survey, has substantially less information, may contain errors, and does not require a certification by the surveyor that it meets all required professional standards of surveying. Ramirez assigned the field work to an employee named Roberto Collado, who no longer lives in Florida. The field work consisted of determining the property corners, and providing a sketch to the real estate salesman. Ramirez did not certify that minimum technical standards had been met but did sign and seal the drawing on March 22, 1984. At the same time he provided the following certification: I HEREBY CERTIFY: that the attached sketch of survey represents a recent survey made under my direction, and is true and correct to the best of my knowledge and belief. There are no encroachments unless shown thereon. Ramirez also added the following in bold lettering: NOTE: BOUNDARY SURVEY ONLY. No elevations secured or any other featured at the owners representative s request. A short time later, Frank Makowski, also a registered land surveyor and a former professional colleague of Ramirez some ten years earlier was contacted by an attorney (David Liebman) who was handling the sales transaction of McNiely's property. The closing was being held up because Ramirez's survey reflected a house sitting on both lots 36 and 37. Makowski was requested to verify the encroachment onto lot 36, and to ascertain the true location of the property boundaries. Makowski initially contacted Ramirez and requested a copy of his sketch and field notes. These were supplied by Ramirez, who gave no indication to him that the work was only "preliminary" in nature. Makowski then sent out a field team to survey the property. It found that the west boundary on the Ramirez survey was actually thirty-three feet off, which caused the purported encroachment on lot 36. The sketch made by Ramirez was deficient in a number of respects as established by uncontradicted expert testimony. To begin with, the parties have stipulated that the survey did not comply with the minimum technical standards for land surveying as set forth in Chapter 21HH- 6, Florida Administrative Code. These include Rules 21HH- 6.03(1), (2), (4), (6)-(8), (12), (18)-(20), and 21HH- 6.06(1), Florida Administrative Code, as alleged in the administrative complaint. For example, it contained no certification, did not reflect all bearings and angles, and monumentations were not set. In short, the Ramirez survey technique and procedure was not in conformance with the procedure required by generally accepted and prevailing standards of land surveying. Moreover, even though it was identified as a "boundary survey;" expert testimony established that the project was indeed a survey within the meaning of the term and it had to meet such technical standards or plainly provide a disclaimer to indicate that such standards were not met. In September, 1983, respondent was engaged by an engineering firm to "secure ground elevations along the above property (Southwest 168th Street and Southwest 192nd Avenue, Dade County) and then relate said elevations to a Dade County Bench Mark," and to "prepare a sketch of survey showing said existing ground elevations." For this he was to be paid $150. The property was owned by Alfred and Linda Wilson. Ramirez first obtained by telephone a bench mark on September 30, 1983; from the Dade County Surveying Department and then sent a field crew to complete the task. The bench mark he selected was across a canal and some three-quarters of a mile from the property in question in an area with heavy undergrowth. This made an accurate measurement more difficult to perform. The accuracy of vertical control surveys (elevations) is essential since this determines whether a parcel of land must have fill added in order to install a septic tank and well. It also affects the flood insurability of a home. Such surveys are subject to the minimum technical standards of the profession, as adopted by agency rules, unless the survey is a "specific purpose survey." In that event the same must be clearly stated on the face of the survey. In this case Ramirez, merely noted on the face of the sketch: "preliminary sketch, only elevations are included in this sketch of survey, no horizontal distances were measured nor controls set and distances shown along the sketch are for location purposes only." He also certified that "the elevations shown refer to a National Vertical Geodetic Datum of 1929, Bench Mark, were secured by us under my direction and are true and correct to the best of my knowledge and belief." Ramirez considered the project to be a "special purpose sketch" and therefore did not believe he had to certify that minimum technical standards had been met. Indeed, he conceded that such standards had not been met in preparing the documents. Makowski was requested to perform a survey on the Wilson property on June 12, 1984 to verify the accuracy of Ramirez s survey. He found the actual elevations to be approximately two feet lower than those reflected on Ramirez's sketch. 2/ The accuracy of Makowski's findings was corroborated by a survey previously performed by another surveyor in 1979. That survey, which is a public record on file with the Dade County Subdivision Control Department, indicated that because of the property's low elevation, fill was required to meet flood criteria. Through the testimony of Makowski and another expert land surveyor, James E. Beadman, it was established without contradiction that Ramirez's work failed to comport with minimum technical standards of the land surveying profession. For example, Ramirez had insufficient field notes, he used too few turning points, and did not perform a loop closure. Further, there is no bench mark description or certification by Ramirez on the survey, and Ramirez used a Linker rod to transfer elevations from one bench mark to another in contravention of accepted standards. Had Ramirez desired to qualify his elevation survey in accordance with agency rules, he should have identified his survey as a topographic survey and indicated that improvements were not located. By calling it an elevation survey, Ramirez did not change its true character of being a topographic survey. Rule 21HH-6.06, Florida Administrative Code, requires that when a survey is not performed, a surveyor should "state that such sketch is not a survey" on the face of the sketch. All other surveys must meet minimum technical standards, and by signing and sealing the drawings, a surveyor certifies as such. Ramirez justified his work in the McNiely project as being simply preliminary in nature. If he conducted a complete survey at a later time, he would then obtain more information, and correct any errors present on the initial drawings. Similarly, he viewed the Wilson survey as a special purpose sketch," and one not requiring compliance with minimum technical standards. Ramirez has performed hundreds of surveys in the past fifteen years; and there is no evidence of any formal disciplinary action having been instituted against him for negligence or misconduct. Both surveys were eventually performed in an accurate manner by Makowski. There were no complaints filed against Ramirez by either client. The complaint herein stems from Makowski who reported the alleged violations to petitioner after reviewing Ramirez's work.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondent be found guilty as set forth in the conclusions of law portion of this orders and that he be fined $1000 and placed on two years probation. All other charges should be DISMISSED. DONE and ORDERED this 7th day of August, 1985, in Tallahassee, Florida. Hearings Hearings DONALD R. ALEXANDER Hearing Officer Division of Administrative The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative this 7th day of August, 1985.

Florida Laws (8) 120.57455.227472.027472.031472.0336.036.0690.901
# 5
ORLANDO UTILITIES COMMISSION vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-001431 (1981)
Division of Administrative Hearings, Florida Number: 81-001431 Latest Update: Nov. 01, 1991

Findings Of Fact The Department of Environmental Regulation published notice of this land use hearing on July 2, 1981, in the Sentinel Star newspaper. Notice was also published in the Florida Administrative Weekly. The application posted notice of this hearing at the proposed site, and the Department of Environmental Regulation mailed notice of this hearing to the chief executives of the local and regional authority with responsibility for zoning and land use planning whose jurisdiction includes the site. The Orlando Utilities Commission is an independent authority engaged in the generation and distribution of electric power to persons within the service area. Its application in the is proceeding seeks site certification for the construction of a coal-fired electric generating plant and ancillary facilities, including railroad tracks, transmission lines, service road, and water lines, all located in Orange County, Florida. The site consists of 3,280 acres located in sections 13, 24, and the East one-half of sections 14 and 23, Range 31 East, Township 23 South, and sections 18 and 19, Range 32 East, Township 23 South. The initial development of the site is intended to use approximately 990 acres, with the ultimate development utilizing approximately 1,110 acres. It is the ultimate intent to place additional electric generating units on the site. The site is presently used primarily as a livestock range, with most of the site also leased for hunting. No development exists on the site. That part of the site not actually occupied by the generating facilities may be leased for livestock grazing. A news release of the information required to be provided in the public notice pursuant to Rule 17-17.06(2)(a), Florida Administrative Code, was not sent by the Department of Environmental Regulation to appropriate news wire services, nor such other media selected by the Department. However, newspaper articles about the site certification application published in the Orlando Sentinel Star as early as July 21, 1981, and newspaper articles that followed thereafter indicate that the news media had actual notice of the site certification application and proposed land use hearing. The evidence establishes that no one's rights were prejudiced by the failure of the Department to provide a news release about the pending land use hearing to the wire services. The Orange County Zoning Resolution presently zones the proposed site as A-2, Farmland, Rural District. Such a zoning does not allow electric generating facilities such as that sought to be certified in this proceeding. However, the zoning authority for the proposed site, the Board of County Commissioners of Orange County, Florida, by resolution dated August 11, 1981, has granted a special exception to the Orlando Utilities Commission for a coal burning electric power plant in an A-2 zoning district. That special exception applies specifically to the site proposed for certification her, and is for the purpose of zoning the proposed site so that an electric generating facility may be constructed. The use of the proposed site for the purposes intended is consistent with the elements of the Orange County Growth Management Policy which is the applicable land use plan for the proposed site.

Florida Laws (4) 403.507403.508403.516403.519
# 6
BOARD OF PROFESSIONAL LAND SURVEYORS vs. AMONS D. COURTNEY, JR., 88-002743 (1988)
Division of Administrative Hearings, Florida Number: 88-002743 Latest Update: Nov. 21, 1989

Findings Of Fact At all pertinent times respondent Amons D. Courtney, Jr., has been registered as a professional land surveyor holding license No. LS 002819 issued by petitioner. By order entered October 3, 1985, in case No. 0052302, the Board of Professional Land Surveyors placed respondent on probation for the second time. As a condition of probation, he was required to submit 25 surveys representative of his land surveying practice which shall be accompanied by field notes and record plats to the Board for its review. . . . Five surveys shall be submitted within three months from the filing of the final order; thereafter, five surveys shall be submitted at six month intervals during the period of probation. Petitioner's Exhibit No. 11. As far as the evidence disclosed, Mr. Amons submitted the requisite number of surveys for review, within the times specified by the Board's order, but pertinent record plats did not always accompany these submissions. Among the surveys submitted to the Board in accordance with the probation condition was a survey done for James Harvey by Mr. Courtney, doing business as "Courtney-Tisdale Ent., Inc." Petitioner's Exhibit No. 1. "Courtney & Tisdale Ent., Inc." has never been licensed in Florida, nor did petitioner ever issue a certificate of authorization to any such entity. Petitioner's Exhibit No. 8. Among the surveys Mr. Courtney furnished to the Board in accordance with his probation condition, was one he did for Cynthia Cotton. On this survey, respondent failed to report or resolve a discrepancy between a distance he had measured, as reported in field notes, and the calculated distance he set out without qualification, on the survey. He also reported the length of one side of the lot as precisely 125 feet, despite the absence of any field notes to support this conclusion. Petitioner's Exhibit No. 3. Mr. Courtney performed a survey of a rectangular lot for Kim Shepherd, and subsequently furnished a copy of it to the Board. The accuracy of this survey is open to serious question. Petitioner's survey reported lengths for the lot's sides that correspond precisely to what appears on the record plat. This is also the case with the angles the sides form when they meet, even though "it's almost impossible to repeat [such measurements] to the nearest second of ar[c]." T.123. The field notes reflect no measurements that would support these findings. Mr. Amons reset a back monument nevertheless. Petitioner's Exhibit No. 4. On the Larry Holly survey, also chosen by respondent for Board review, Mr. Courtney failed to disclose a discrepancy between the measured distance, as reported in field notes, and a distance set out on a record plat. Petitioner's Exhibit No. 5. On the Robert and Connie Baxley survey, Mr. Courtney indicated a discrepancy between the south boundary line and a fence along the line but did not show whether the fence encroached on the Baxley property or on the neighbor's. Petitioner's Exhibit No. 6. The field notes reflect "a startling lack of precise measurements." On the Randy Enslow survey, too, the field "notes are insufficient to support the precision of the measurements that are shown . . ." T.13l. The survey is not tied to the closest street corner or to any other outside reference point for control. In short, even though the Board's final order in case No. 0052302 left it to respondent to select "representative" surveys for review, the surveys he submitted, twenty in all, were riddled with errors, including errors and omissions that constituted negligence in the practice of surveying. The uncontroverted evidence established that "Mr. Courtney is either unable or unwilling to comply with the Minimum Standards based on the surveys that were submitted by him under probation." T.134. As to penalty only, petitioner proved that respondent was a subject of disciplinary action in case No. 33882, before either the present proceedings or the proceedings that eventuated in the probation order were instituted.

Recommendation Under Rule 22 HH-9.002, Florida Administrative Code, permissible penalties for these offenses range from reprimand to revocation "depending upon severity of offense and injury to the client or public". No injury was proven here, but expert testimony established the seriousness of the negligence. Also pertinent under Rule 22 HH-9.003, Florida Administrative Code, are previous offenses, respondent's disciplinary history, and "status of the . . . licensee at the time the offense was committed", Rule 22 HH-9.003(1)(f), Florida Administrative Code, all of which weigh against respondent, and financial hardship for the licensee, as to which there is no evidence. It is, accordingly, RECOMMENDED: That petitioner revoke respondent's license to practice land surveying. DONE and ENTERED this 20th day of November, 1989, at Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of November, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NOs. 88-2743, 89-3399 Petitioner's proposed findings of fact Nos. 1 through 6 and 18 have been adopted, in substance, insofar as material. Petitioner's proposed findings of fact Nos. 7 through 13 are properly proposed conclusions of law. Petitioner's proposed findings of fact Nos. 14 through 17 relate to subordinate matters. COPIES FURNISHED: Elizabeth R. Alsobrook, Esquire Department of Professional Regulation 1940 North Monroe Street Suite 60 Tallahassee, Florida 32390-0729 R. Glenn Arnold Warfield, Santurri & Arnold 25 West Cedar Street Post Office Box 13410 Pensacola, Florida 32591 Amons D. Courtney, Jr. Route 4, Box 892 Milton, Florida 32570

Florida Laws (4) 455.227472.021472.031472.033
# 7
BOARD OF PROFESSIONAL LAND SURVEYORS vs. THEODORE C. BOLDT, 88-002745 (1988)
Division of Administrative Hearings, Florida Number: 88-002745 Latest Update: Aug. 29, 1988

Findings Of Fact At all times pertinent to the allegations contained in the Administrative Complaint, the Respondent, Theodore C. Boldt, was a professional land surveyor registered by the State of Florida under license Number LS002387, granted after examination on July 9, 1976, with an expiration date of January 31, 1989. The Department of Professional Regulation, Board of Professional Land Surveyors, (Board), was and is the state agency charged with the regulation of land surveying in this state. On August 5, 1985, the Board entered a Final Order in which it concluded Respondent had violated various sections of the Florida Statutes and Rules. The Board suspended Respondent's license to practice land surveying for six months and, inter alia, required him to submit twenty-five surveys representative of his land surveying practice, accompanied by field notes and record plats for review by the Board. Respondent has submitted fifteen of the surveys, the first ten of which were accepted by the Board. Survey eleven through fifteen, however, were determined to be unsatisfactory. On the basis of that Board determination, an Administrative Complaint was filed in this case alleging that the five surveys failed to meet minimum acceptable standards and thereby constituted a violation of Florida Statutes. The surveys in question were evaluated by Walter A. Paxton, Jr., a registered land surveyor for fifteen years, who has spent a total of thirty-five years in the surveying field. During the course of his career, he has done several thousand surveys and has never had a complaint filed against him. As a part of his practice, he keeps up with the Rules and Standards of the profession by review of agency bulletins and letters and by taking continuing education seminars. Mr. Paxton graded these surveys utilizing a Minimum Standards Probation Report Checklist which identified numerous items for evaluation and grading. Grades available included violation; acceptable, which means that the answer meets the requirements of the rules; not applicable, which means that the subject matter does not pertain to the case under consideration; and marginally acceptable, which refers to an error of a minor nature, such as a typographical error, which is not a true violation of the Rule setting forth minimum standards. With regard to the first survey evaluated, Survey Exhibit 11, Mr. Paxton found one violation. Under the pertinent rule, each survey must fall into a descriptive category to be designated on the drawing. In this case, Respondent described the survey as a "Boundary" survey when, in fact, it should have been described as "As Built." A "Boundary" survey is generally utilized only for raw acreage and this property had a structure built on it. Mr. Paxton also found one marginally acceptable item in that the survey did not reflect the relevant Rule under which the survey was conducted. As to Survey Exhibit 12, Mr. Paxton found two violations. Again, the type of survey described was wrong and the survey failed to show the lot dimensions on the West side of the final drawing. The field notes reflected 81 feet for the West side of the lot. Of the four marginally acceptable issues, the first dealt with the completeness of the survey and relates to the Respondent's failure to put in the total dimensions as described above. In the second, the drawing failed to show the bearings on the finished product. The third relates to Respondent's failure to indicate the adjoining lot and block number on the South side of the drawing. The fourth pertains to Respondent's failure to reflect the Rule number in his certification. This last was a deficiency in each of the five surveys in question. As to survey Number 13, Mr. Paxton found one violation which again related to Respondent's use of the term "Boundary" survey instead of "As Built" on a survey of a lot on which a structure has been erected. Two marginally acceptable items related to the failure to show the Rule in the certification and Respondent's failure to list both lot and block when identifying lots adjacent to the property under survey. This, too, is a repeat deficiency. In the fourth survey, Number 14, Mr. Paxton found three violations and three marginally acceptables. The violations related to the Respondent's failure to show a Block identification on the survey and his showing only of the lot number. The second was that Respondent's field notes did not indicate a closure on elevation, but instead, showed only the elevation from the benchmark to a point on the ground. Respondent admitted this was a violation. The third related to Respondent's failure to indicate the original benchmark on the drawing but only the site benchmark. In this case, Respondent admits to this but indicates he could not find the original benchmark because of the distance from the site of the survey. He described the search therefor as being "hard" to do. The marginally acceptable items on this survey again relate to Respondent's failure to show the Rule number in the certification portion of the survey; his failure to include the Block number in addition to the Lot number on the sketch; and his failure to identify adjoining property Lot and Block numbers on the drawing. The fifth survey contained two violations and four marginally acceptable items. The violations were, again, the failure to properly describe the survey as "As Built", and the failure to indicate angles on the field notes. The four marginally acceptables relate to the Respondent's failure to refer to the Rule in his certification; his failure to indicate the block number as well as the lot number on the sketch; the failure to maintain acceptable quality field notes (the failure to list the angles as required); and the failure to reflect on the second sketch of this property a revision date indicating the first sketch was changed. Based on the above identified violations and marginally acceptable items, Mr. Paxton concluded that the surveys in question here do not meet the acceptable standards of the State of Florida for surveys and it is so found. Respondent does not deny that the actions alleged as violations or marginally acceptable areas occurred. He objects, however, to the fact that they were described as violations. Mr. Boldt has been in the surveying profession for 49 years, having started with his father at the age of 10. It is his practice not to put the Block number on a survey unless Lots beside or behind the Lot being surveyed are in a different Block. This practice has been accepted by various banks and the county since he has been doing it and certainly since 1983, when the subject was made a matter of Rule. By the same token, banks and the county have also for years accepted without question his use of the descriptive term, "Boundary" for the type of survey. Accepted use is irrelevant, however, if the rules in question prescribe otherwise. From his testimony it can only be gathered that Respondent complies with the Rules "when he can." When Mr. Paxton pointed out that the requirements identified here appear in the Rules of the Board, Respondent pointed out that the Rules were "new Rules". This approach to the profession of land surveying, while satisfactory to him, is not acceptable when measured against the Board rules.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that Respondent's license as a registered land surveyor in Florida be suspended for 18 months with such suspension to be stayed for a probation period of 18 months under such terms and conditions as the Board of Professional Land Surveyors may specify. RECOMMENDED this 29th day of August, 1988, at Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of August, 1988. COPIES FURNISHED: G. W. Harrell, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399 Theodore C. Boldt 5424 Hayden Blvd. Sarasota, Florida 33582 Allen R. Smith, Jr. Executive Director DPR, Board of Professional Land Surveyors 130 North Monroe Street Tallahassee, Florida 32399-0750 Bruce D. Lamb, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (4) 120.57455.227472.031472.033
# 9
SUMTER CITIZENS AGAINST IRRESPONSIBLE DEVELOPMENT, ET AL. vs DEPARTMENT OF COMMUNITY AFFAIRS AND SUMTER COUNTY, 00-003027GM (2000)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Jul. 24, 2000 Number: 00-003027GM Latest Update: Jun. 25, 2001

The Issue The general issue for determination in this case is whether Amendment 00-D1 to Sumter County’s comprehensive plan (the “Plan Amendment”) is "in compliance" with the Local Government Comprehensive Planning and Land Development Act, Sections 163.3161 through 163.3217, Florida Statutes. (All statutory references are to the 2000 codification of the Florida Statutes.) The initial Petition to Request Administrative Hearing (Petition) alleged numerous reasons why the Plan Amendment should be found not "in compliance." But from the time of the initial Petition--through the Joint Prehearing Stipulation, opening statement at final hearing, and Proposed Recommended Order (PRO)--Petitioners reduced the number of reasons why they contend that the Plan Amendment is not "in compliance" to the following: simultaneous conversion of Future Land Use (FLU) from Agricultural to PUD allegedly inconsistent with parts of the County's Plan's; alleged lack of demonstrated need for land use allocations contrary to Section 163.3177 and Florida Administrative Code Rules Chapter 9J-5 (all rule citations are to the Florida Administrative Code); conversion of FLU from Agricultural to PUD allegedly inconsistent with the Plan's Policy 4.6.1.1 (the so-called "90% rule"); and alleged failure to discourage urban sprawl contrary to Rule 9J-5.0006(6). These are the only compliance issues that still have to be addressed in this proceeding. In addition, Intervenor contends that Sumter Citizens Against Irresponsible Development (SCAID) does not have standing.

Findings Of Fact Intervenor, the Villages of Lake-Sumter, Inc., owns land in the northeast part of Sumter County on which Intervenor plans to construct a mixed-use development of regional impact (DRI) known as the Villages of Sumter. The proposed DRI will encompass approximately 4,679 acres and is anticipated to contain: 11,097 residential dwelling units; 1,250,000 square feet of commercial area; 250,000 square feet of office area; 157,000 square feet of institutional area; 120,000 square feet of hotel (300 rooms); 100,000 square feet convention center; 23,500 square feet of movie theater (8 screens); 512 acres of golf courses (126 holes); 8 marina slips; 602 acres of wildlife management and Kestrel foraging areas; 162 acres of lakes, 162 acres of roads, 31 acres of parks and buffers; and 227 acres of stormwater and open space. The proposed DRI will feature neighborhood and town centers and will extensively utilize clustering, open spaces, and buffering as part of its design. It is anticipated that the Villages of Sumter DRI will have an internal vehicle capture rate of over 60%--i.e., over 60% of vehicle trips starting in the DRI will not go outside the DRI. The DRI will provide water, sanitary sewer, stormwater management, aquifer recharge areas, and other governmental services as part of its development. Eighty percent of the residents in the Villages of Sumter DRI will have to be occupied by persons 55 of age or older, and no one under 19 will be permitted to reside within this DRI. When Intervenor filed its Application for Development Approval (ADA) for the Villages of Sumter DRI, Intervenor also requested the subject Plan Amendment to accommodate the DRI, including a change in the Future Land Use Element (FLUE) and FLUM from Agricultural use to UEA and PUD. The ADA itself served as a major part of the data and analysis supporting the Plan Amendment. (Another major part of the data and analysis was the Evaluation and Appraisal Report (EAR) prepared by the County in 1995.) The western part of the northern boundary of the Plan Amendment parcel (i.e., the Villages of Sumter DRI) will be the western part of the southern boundary of a related DRI developed by Intervenor known as the Tri-County Villages. From there, the Tri-County Villages DRI extends north to the southern border of Marion County and east to the western border of Lake County. (Towards the east, the northern boundary of the DRI drops just a little south of the southern border of Marion County.) Tri- County Villages is a large mixed-use DRI. It includes residential, commercial, recreational, and open space land uses. Prior to the Tri-County Villages DRI, Intervenor or its predecessor also developed other related mixed-use DRIs to the east in Lake County. SCAID was formed in 1993 or 1994 to oppose the Tri- County Villages DRI and 1994 comprehensive plan amendments adopted to accommodate the Tri-County Villages DRI. SCAID, T. Daniel Farnsworth, and James E. Boyd filed a petition initiating Sumter Citizens Against Irresponsible Development, T. D. Farnsworth, and James E. Boyd vs. Department of Community Affairs and Sumter County, DOAH Case No. 94-6974GM, to oppose DCA's determination that the County's 1994 amendments were "in compliance." SCAID, Farnsworth, and Weir are collaterally estopped to deny facts established in DOAH Case No. 94-6974GM (SCAID I). (Latham and Roop are not estopped.) See Conclusions of Law 63-64, infra. In any event, all Petitioners agreed to official recognition of the Final Order entered in DOAH Case No. 94-6974GM. Among the facts established by adoption of the Recommended Order by the Final Order in SCAID I was the history of the earlier DRIs, the Tri-County Villages DRI, and the comprehensive plan amendments required by the Tri-County Villages DRI: [¶4] [I]ntervenor [Villages] is the owner and developer of the Tri- County Villages development located in unincorporated Sumter County. Development which predated the existing Tri-County Villages development commenced in approximately 1968 with Orange Blossom Garden North (OBGN). OBGN was an approximately 1,000-acre project owned and operated by Orange Blossom Hills, Inc. as a mobile home retirement community located mostly in the Town of Lady Lake, Florida. That community lies in the northwestern corner of Lake County, which adjoins the northeastern corner of Sumter County. Because the development of OBGN commenced prior to July of 1973, it is vested for purposes of development of regional impact (DRI) review pursuant to Section 380.06(20), Florida Statutes. [¶5] In 1987, Orange Blossom Hills, Inc. submitted an Application for Development Approval (ADA) with the Town of Lady Lake which requested authorization to develop Orange Blossom Gardens South (OBGS). The OBGS development was an approximately 595-acre extension of the vested OBGN retirement community and was determined by the DCA and Town of Lady Lake to be a DRI. On January 18, 1988, the Town of Lady Lake approved the proposed OBGS development. [¶6] In 1989, Orange Blossom Hills, Inc. submitted to the Town of Lady Lake and the County an ADA requesting a substantial deviation from the OBGS DRI. The substantial deviation request sought authorization to develop Orange Blossom Gardens West (OBGW). OBGW was planned as an approximately 1,700-acre extension to the OBGS DRI. The Town of Lady Lake approved the substantial deviation request through the issuance of an Amended Development Order on May 7, 1990. The County approved the development within its jurisdiction on May 29, 1990. [¶7] In September 1993, intervenor, as successor to Orange Blossom Hills, Inc., submitted an ADA to the County which requested a substantial deviation from the OBGS and OBGW DRI's. By submitting this latest development, intervenor sought to add approximately 1,960 acres to the existing OBGS and OBGW DRI's and modify the development already approved by adding a total of 6,250 residential units and 910,000 square feet of commercial square footage. The overall development was renamed Tri-County Villages. The development order approving the substantial deviation for Tri-County Villages was adopted by the County on September 20, 1994. [¶8] On September 20, 1994, or prior to approval of the Tri-County Villages development substantial deviation, but in conjunction with it, the County adopted plan amendment 94D1 by Ordinance No. 94-6. On November 10, 1994, the DCA determined the amendment to be in compliance. That amendment amended the plan's Future Land Use Map (FLUM) to revise the land use designations on approximately 1,960 acres of land. Specifically, the plan amendment designated as Planned Unit Development (PUD) all areas of the approved OBGW DRI and the additional 1,960 acres referred to in Exhibit 1 of 94D1 as parcels 5 and 8. Prior to the amendment, parcels 5 and 8 had been designated predominantly as agricultural, with small pockets of rural residential. [¶9] The plan amendment also revised the FLUM by extending the urban expansion area to include all of parcels 5 and 8. Prior to the amendment, only a small section of parcel 8 was included in the urban expansion area. [¶10] The plan amendment further included several textual revisions to the Future Land Use Element (FLUE), including a revision to FLUE Policy 1.5.7 concerning the ratio of commercial square footage to residential units and the addition of FLUE Objective 1.14 and Policies 1.14.1 - 1.14.6, which essentially incorporated the concept of sector planning into the plan. [¶11] Finally, the plan amendment revised Policy 2.1.5 of the Sanitary Sewer Element which, subject to submission of appropriate data and analysis, and Department of Environmental Protection approval, reduced the established level of service for sanitary sewer throughout the Tri-County Villages development. SCAID I, 17 F.A.L.R. 4527, 4531-32 (Dept. Community Affairs Aug. 1995). (The Recommended Order may also be found on WESTLAW at 1995 WL 1052949.) At its inception, the Tri-County Villages DRI was projected to build-out in approximately 2015. When the Tri- County Villages DRI first began construction in late 1992, the developer pulled 24 building permits. In 1993, the County issued 406 residential building permits, 365 of which were pulled for the Tri-County Villages DRI. In 1997, the developer pulled 1,052 building permits for the Tri-County Villages DRI. To date, approximately 13,000 homes have been built in the Tri- County Villages DRI. Based upon present projections, the Tri- County Villages DRI is anticipated to be substantially built-out in 2003-04, 12 years ahead of its initially projected build-out date of 2015. Presently, there are numerous cultural and recreational activities, shopping options, medical and governmental services available to residents within the Tri-County Villages DRI. While still designated as a UEA and PUD on the County's FLUM, the Tri-County Villages DRI in fact is a self-contained urban area, especially in the context of Sumter County. Sumter County is mostly rural. According to the 1995 EAR, the County's permanent (non-seasonal) population was projected to be: 38,961 for 1998; 56,000 for 2005; and 64,200 for 2010. The unincorporated portion of the County contains 334,903 acres, approximately 99,436 acres of which are state- owned conservation lands, and approximately 202,000 acres of which are agricultural lands. There are five municipalities in the County--Wildwood, Bushnell (also the County seat), Center Hill, Coleman and Webster. None are as urbanized as the Tri- County Villages DRI. Simultaneous Conversion Objective 7.1.2 of the County's comprehensive plan provides in pertinent part: Upon adoption of this plan, Sumter County shall . . . provide for a compatible and coordinated land use pattern which establishes agriculture as the primary use outside of the urban expansion area boundary and insures retention of agricultural activities, preserves natural resources and discourages urban sprawl. In pertinent part, the County Plan's Policy 7.1.1.2(e) provides that the County's land development regulations governing PUDs should be based on and consistent with the following standards for densities and intensities: Within the Urban Expansion Area, a base density of up to 8 residential units per gross acre in residential areas and 6 units per gross acre in commercial areas are allowed. . . . . Outside of an Urban Expansion Area, a base density of up to 4 residential units per gross acre in residential, commercial and agricultural areas are allowed. Policy 7.1.5.1 allows PUDs "in the following land use districts and at the following densities/intensities of use": 8 dwellings per gross acre in "Residential Areas Inside UEA"; 6 dwellings per gross acre in "Commercial Areas Inside UEA"; and 4 dwellings per gross acre in "Res./Comm. Uses Outside UEA." Petitioners contend that the foregoing objective and policies somehow combine to preclude the simultaneous conversion of Agricultural FLU to UEA and PUD; they appear to contend that these policies necessitated an intermediate conversion to UEA. (Protection of agricultural lands was raised in a more general sense, but this precise issue was not raised prior to final hearing.) But Petitioners argument not only is not persuasive, it is not even easily understood. It is at least fairly debatable that the objective and policies do not combine to preclude simultaneous conversion of Agricultural FLU to UEA and PUD. Even without prior notice of this precise issue, one of the County's expert witnesses in land planning persuasively testified that the cited objective and policies do not combine to preclude simultaneous conversion of Agricultural FLU to UEA and PUD. Even Petitioners' expert land planner ultimately agreed that there is nothing in the Florida Statutes or Florida Administrative Code Rules Chapter 9J-5 to prevent conversion of agricultural uses to more urban uses. Demonstrated Need As reflected in previous Findings of Fact, the subject Plan Amendment is for a highly mixed-use PUD. Of the many mixed uses involved, Petitioners focus on the allocation of land for residential use in their challenge to the demonstration of need for the Plan Amendment. In this context, demonstrated need refers to the existence of adequate data and analysis to demonstrate the need for additional allocation of residential dwelling units on the FLUM. Petitioners assert that the methodology utilized by the County to project need is flawed. Determination of the need for a certain allocation of residential densities starts with a projection of population on the planning horizon (2020). In doing so, all available data and analysis must be considered. (Petitioners also assert that Policy 7.1.2.5(b)1. of the County's comprehensive plan requires such an analysis "utilizing professionally accepted methods," but that policy speaks to additional densities and allocations of land use for developments proposed in agricultural areas, while the Plan Amendment in this case converts the agricultural land to UEA and PUD.) For the purpose of analyzing whether there is a demonstrated need for this Plan Amendment, the County's planner, Roberta Rogers, relied upon need projections made in conjunction with the preparation of the County's EAR. The EAR, prepared in 1999, included a projection of the County's population for the 2020 planning horizon. The EAR projected that the permanent population of unincorporated Sumter County, by the year 2020, will be 79,475. (The total County permanent population is projected to be 94,205.) One of the purposes of an EAR is to provide data and analysis for comprehensive plan amendments. In preparing the population projections reflected in the EAR, Rogers began her analysis by referring to the projections for Sumter County formulated by the Bureau of Economic and Business Research ("BEBR"), as reported in 1996. The 1996 BEBR Report actually reflected projections made in 1995. BEBR publishes yearly reports that state both the estimated current and the projected future populations for each Florida county. The population projections reflected in BEBR Reports are based upon historical trends of 10-15 years' duration. Because the development in the Tri-County Villages DRI is a relatively recent phenomenon, Rogers believed that reliance upon the BEBR projections alone would have resulted in a significant under-projection of the County's future population. As a consequence, Rogers added an annual rate of growth of 1000 building permits per year through 2005 and 500 permits per year through the remaining portion of the planning period for the Tri-County Villages and the Villages of Sumter. Her approach was a conservative approach, since the actual number of building permits issued for the Tri-County Villages DRI in the past two years has significantly exceeded 1000 per year. Rogers conferred with BEBR, prior to completing her analysis, and was assured that her approach was appropriate. Such an adjustment for the Villages is particularly appropriate since the Villages cater to a very specific segment of the population, i.e., persons 55 and above. Over the twenty- year planning horizon relevant to the Plan Amendment, the population of persons in Florida aged 55 and above will increase dramatically as the "baby boomer" population ages. The demand for residential housing for these senior citizens will show a similar dramatic increase. Henry Iler, the Petitioners' land planning expert, took the contrary position, opining that no additional growth factor should be added to the 1996 BEBR projections. However, Dr. Henry Fishkind, an expert in demography who was involved in the original development of the BEBR population projection methodologies, directly contradicted Iler's opinion, concluding instead that Ms. Rogers' methodology was appropriate. As Dr. Fishkind stated that [Sumter] county has experienced a dramatic structural change to its population growth and development because of the Villages, and that has altered the characteristics of its population growth. In light of that, the use of past trends, which is what the bureau [BEBR] does, is simply extrapolate past trends, would not be appropriate, for it would not have taken into account that major structural change. Ms. Rogers identified the structural change, she measured its amount, and then she added on to the bureau's projections, which were extrapolations of the past trends. That's a very appropriate adjustment, and it's the kind of adjustment that econometricians and economists make on a regular basis. DCA's analysis concurred that the high absorption rates in the Tri-County Villages DRI had to be taken into account. To have ignored the explosion of growth in the Tri- County Villages DRI, particularly in view of the generally accepted expectation that the population to be served by the Tri-County Villages and by the Villages of Sumter will experience tremendous growth, would have resulted in an inaccurate population forecast. Even Iler had to concede that he was aware of building permit data being used to project population figures. It is simply not his preferred methodology to use such information. Thus, Rogers' projection of the County's total population for the year 2020 appropriately incorporated all available and relevant data and was formulated using an accepted methodology. While not part of their PRO, Petitioners previously attacked the County's population projections by questioning the continued success of the Villages to attract out-of-state retirees. Primarily through Weir's testimony, they attempted to raise the specter of a reduction of sales and Intervenor's subsequent financial ruin. But there was no credible evidence to support Petitioners' prophecy of doom. On the evidence presented in this case, it would be more rational from a planning standpoint to expect the Villages to continue to be a marketing and financial success. Having reasonably projected future population, it was then incumbent upon the County to determine how many dwelling units would be needed to accommodate anticipated housing needs. This determination was made by Gail Easley, an independent planner retained by the County to assist Rogers in preparation of the EAR. Easley performed this calculation for the County. Easley used 2.46 as the average number of persons per dwelling unit in the County, a figure taken from the BEBR reports (not from 1990 census information, as Iler incorrectly surmised.) There was no evidence that a number other than 2.46 was appropriate. It would not be appropriate for the number of dwelling units needed in the future to be calculated simply by the division of the anticipated population by the average household size. Rather, it is appropriate to apply a "market factor" (or multiplier) in order to ensure that there is a choice of types of housing and to accommodate lands that are not actually useable for residential construction. Even Petitioner's expert, Henry Iler, agreed that the use of a market factor was appropriate in order to ensure sufficient housing supply and to avoid an increase in housing prices. Easley furnished Rogers with the market factor for the EAR. The market factor chosen by Easley was 1.5, a factor she viewed as conservative and as appropriate for a jurisdiction that is beginning to urbanize. In more rural counties, a higher market factor, such as 2.0, should be used. While Iler implied that a lower marker factor would be more suitable, the record clearly established that the market factor used by Easley fell within the range of reasonable choices. (In SCAID I, the ALJ expressly found, in paragraph 31 of the Recommended Order, that the 1.87 market factor used by the County on that occasion was reasonable and actually low compared to factors used for other comprehensive plans that had been found to be "in compliance." As reflected by this Finding of Fact, facts and circumstances bearing on the choice of a market factor for Sumter County have not changed significantly to date. Cf. Conclusion of Law 64, infra.) Applying the 1.5 market factor to the projected population and average household size, the County determined that 62,274 dwelling units will have to be accommodated during the twenty-year planning horizon. (This includes 48,461 units in permanent housing, 9,113 in seasonal housing, and 4,700 in transient housing.) The County then allocated those dwelling units in various land use categories. Much of Petitioners' PRO on this point was devoted to criticizing parts of the evidence in support of the demonstration of need. They state the obvious that Easley did not perform a demonstration of needs analysis for the Plan Amendment in the EAR, but that was not the purpose of the EAR; nonetheless, the EAR contained valuable data and analysis for use in the demonstration of need analysis for the Plan Amendment. Petitioners also questioned DCA's reliance on the DRI ADA in conducting its demonstration of need analysis, based on the timing of the ADA and Plan Amendment submissions and decisions; but it is not clear what it was about the timing that supposedly detracted from DCA's demonstration of need analysis, and nothing about the timing made it inappropriate for DCA to rely on the data and analysis in the ADA. Petitioners criticized Rogers' reference to up-to-date building permit information that was not offered in evidence; but this information only further supported Rogers' demonstration of need analysis. Petitioners asserted that one of Intervenor's witnesses may have overstated residential sales in the Tri- County Villages DRI (1,750 sales a year versus evidence of 1,431 building permits for 1999); but the witness's statement was not used in any of the demonstration of need analyses. Finally, Petitioners attacked one of Intervenor's witnesses for an alleged "conflict of interest, a lack of professional integrity and an indication of bias"; but the basis for this allegation supposedly was evidence that the witness worked for the County while also working for Intervenor or its predecessor for a few years in the late 1980's, not enough to seriously undermine the credibility of the witness's testimony in this case (which in any event had little or nothing to do with the demonstration of need analyses.) It is at least fairly debatable that the County's demonstration of need was based on relevant and appropriate data, and professionally acceptable methodologies and analyses. Likewise, it at least fairly debatable that the County's projections regarding housing needs, the growth in the retirement population, and the absorption rates achieved in the existing Tri-County Villages DRI adequately support the allocation of 11,000 dwelling units permitted by the Plan Amendment. So-called "90% Rule" The County's Plan Policy 4.6.1.1 provides: The County shall maintain approximately 90% of its land area in land uses such as agricultural (including timberland, mining and vacant), conservation, and open (recreation, open space etc.) land uses for this planning period. (Emphasis added.) This policy is found in the Utilities Element of the County's comprehensive plan under a goal to protect and maintain the functions of the natural groundwater aquifer recharge areas in the County and under an objective to protect the quantity of aquifer recharge. Although couched as an approximation, the policy has been referred to as the "90% rule." Based on the evidence presented in this case, it is at least fairly debatable that the subject Plan Amendment is not inconsistent with Policy 4.6.1.1. The primary debate had to do with the proper treatment of certain "open space" provided in the Tri-County Villages DRI and the Villages of Sumter DRI-- 1,032 acres in the former and 2,135 acres in the latter. This "open space" consists of golf courses, preserves, wetlands, parks/buffers, and some stormwater/open spaces. Petitioners' expert refused to count any of this acreage for purposes of the so-called "90% rule" because, while the FLUE and FLUM have Agricultural, Conservation, and Recreation land use categories, there is no category designated "Open Space." (Meanwhile, there is an entire element of the plan entitled "Recreation and Open Space.") The witnesses for the County and DCA counted those 3,167 acres. They reasoned persuasively that the policy's express mention of "open space" (as opposed to a specific land use category designated "Open Space") supports their position. They also argued persuasively for the logic of including "open space," which serves the objective of the policy to "protect quantity aquifer recharge quantity," even if there is no specific land use category designated "Open Space." Counting the 3,167 acres of "open space" in the two DRIs, the percentage calculated under Policy 4.6.1.1 exceeds 90% for existing land uses. Omitting that land, as well as another 500 acres that should have been counted, Petitioners' expert calculated 88.96%. Petitioners' expert also calculated a lower percentage (85.34%) by using land uses he projected for the end of the planning period. However, Petitioners' expert conceded that it was not clear that Policy 4.6.1.1 should be interpreted in that manner. If so interpreted, it would be possible for all plan amendments reducing agricultural, conservation, and open FLUs to be prohibited even if existing land uses in those categories did not fall below "approximately 90%" for another 20 years. It is at least fairly debatable whether such a result is logical, or whether it is more logical to wait until existing land uses in those categories did not fall below "approximately 90%" before prohibiting further FLUE and FLUM amendments. Urban Sprawl Petitioners contend that the Plan Amendment fails to discourage urban sprawl. They attempted to prove seven urban sprawl indicators. But their evidence was far from sufficient to establish any beyond fair debate. Petitioners did not prove that the Plan Amendment promotes, allows or designates for development substantial areas of the jurisdiction to develop as low intensity, low density, or single-use development or uses in excess of demonstrated need. To the contrary, while gross residential density may be relatively low (2.4-2.6 units per gross acre), the Plan Amendment PUD provides for highly mixed-use development, not single-use development, and densities in residential areas within the PUD are significantly higher (up to 5.6 units per acre), especially for Sumter County. Petitioners also did not prove that the Plan Amendment promotes, allows or designates significant amounts of urban development to occur in rural areas at substantial distances from existing urban areas while leaping over undeveloped lands which are available and suitable for development, or that the Plan Amendment promotes, allows or designates urban development in radial, strip, isolated or ribbon patterns generally emanating from existing urban developments. To the contrary, the evidence was that part of the northern boundary of the Plan Amendment parcel coincides with the western part of the southern boundary of the Tri-County Villages DRI, and the Villages of Sumter PUD will be an extension of the Tri-County Villages DRI, which already has all the characteristics of an existing urban area. The reason why the eastern part of the northern boundary of the Plan Amendment parcel does not coincide with the southern boundary of the Tri-County Villages DRI is the existence of land in between which is already in use and not available to become part of the Plan Amendment PUD. Development will not be in a radial or ribbon pattern like (usually) commercial development along main roadways; nor will development be isolated. Petitioners did not prove that the Plan Amendment fails to protect adjacent agricultural areas and activities, including silviculture, and including active agricultural and silvicultural activities as well as passive agricultural activities, and dormant, unique and prime farmlands and soils. Obviously, conversion of agricultural land eliminates such land from agricultural use. But the Plan Amendment protects adjacent agricultural land by phasing development starting from existing urban areas in the Tri-County Villages DRI by mixing in open and recreational uses throughout the Villages of Sumter PUD and by providing some additional buffer between the periphery of the PUD and adjacent agricultural lands. Petitioners did not prove that the Plan Amendment fails to maximize the use of existing public facilities and services. Indeed, Petitioners' land use planning expert admitted at the hearing that he "didn’t have the time or expertise, really, to try to evaluate this particular question." To the contrary, the evidence was that the Plan Amendment PUD will include water, sanitary sewer, stormwater management, aquifer recharge areas, and other governmental services as part of its development. In addition, impact to schools will be minimal or non-existent due to the character of the PUD as a retirement community. Petitioners did not prove that the Plan Amendment fails to provide a clear separation between rural and urban uses. To the contrary, the evidence was that clustering, open spaces and buffering in the Villages of Sumter PUD will provide a clear enough separation between rural and urban uses. Petitioners did not prove that the Plan Amendment discourages or inhibits in-fill development or the redevelopment of existing neighborhoods and communities. Specifically, Petitioners argued that in-fill in the City of Wildwood will be discouraged. But the evidence was to the contrary. Not only would development of the kind envisioned in the Plan Amendment PUD be unlikely to occur in Wildwood, sufficient land is not available for such a development there. Actually, the Plan Amendment might encourage in-fill in Wildwood, where service providers for the Villages of Sumter might be expected to reside. SCAID SCAID was formed in 1993 or 1994 by a small group of Sumter County citizens for the purposes of preserving the "rural lifestyle" of Sumter County, preventing urban sprawl, and ensuring "that development will not be a burden to the taxpayers" of the County. SCAID has about 80 members, who are not required to pay dues. The majority of SCAID's members live in Sumter County, including all of the individual Petitioners in this case. SCAID is not incorporated but has by-laws drafted in 1995 or 1996. The by-laws provide for election of officers for one-year terms, but SCAID has not had an election of officers since 1994. Petitioner, T. Daniel Farnsworth, is and always has been SCAID's president. The evidence was that, when former SCAID member James Boyd resigned, Petitioner Linda Latham was appointed to replace him as secretary. SCAID has held just two meetings since its inception. Approximately 15-20 persons attended each meeting. Most communication with members is by regular and internet mail. Financial contributions are solicited from time to time for litigation efforts initiated by SCAID. Farnsworth, on behalf of SCAID, submitted comments on the Plan Amendment to the County between the transmittal hearing and the adoption hearing. Farnsworth and Weir also testified on behalf of Petitioners at final hearing. The other individual Petitioners did not.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that, under Section 163.3184(9)(b), the Department of Community Affairs enter a final order that Sumter County's Amendment 00-D1 is "in compliance." DONE AND ENTERED this 20th day of February, 2001, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of February, 2001. COPIES FURNISHED: Martha Harrell Chumbler, Esquire Nancy G. Linnan, Esquire Carlton, Fields, Ward, Emmanuel, Smith & Cutler, P.A. Post Office Box 190 Tallahassee, Florida 32302-0190 Jane M. Gordon, Esquire Jonas & LaSorte Mellon United National Bank Tower Palm Beach Lakes Boulevard, Suite 1000 West Palm Beach, Florida 33401-2204 Terry T. Neal, Esquire Post Office Box 490327 Leesburg, Florida 34749-0327 Colin M. Roopnarine, Esquire Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 Steven M. Seibert, Secretary Department of Community Affairs 2555 Shumard Oak Boulevard, Suite 100 Tallahassee, Florida 32399-2100 Cari L. Roth, General Council Department of Community Affairs 2555 Shumard Oak Boulevard Suite 325 Tallahassee, Florida 32399-2100

Florida Laws (10) 120.52163.3161163.3164163.3177163.3180163.3181163.3184163.3217163.3245380.06 Florida Administrative Code (3) 9J-5.0039J-5.0059J-5.006
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer