MANASOTA-88, INC., AND MANATEE COUNTY SAVE OUR BAYS ASSOCIATION, INC. vs HUNT BUILDING CORPORATION AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-002350 (1990)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Apr. 19, 1990 Number: 90-002350 Latest Update: Jan. 03, 1991

Findings Of Fact At all times pertinent to the issues herein, the Department was the state agency responsible for the regulation and issuance of dredge and fill permits for waters of the state. Hunt is a real property development company which owns the property in issue located contiguous to Sarasota Bay on the east and an artificial canal, dredged many years ago, located to the south. The property in issue includes submerged lands. Petitioners, Manasota and Manatee are environmental interest associations whose standing as parties hereto was stipulated to by Hunt and the Department. The Rosens are owners of a piece of land at the bayward end of the property located to the south of the artificial canal to the south of the property in issue. On September 2, 1988, Hunt applied to the Department for a dredge and fill permit to construct a dock system four feet wide and approximately one thousand feet in length along the northern edge of the artificial canal. Four access walkways would extend from the existing berm to the north out to the proposed dock. The request also sought permission to trim mangroves to facilitate construction of and provide access to the dock; to place 22 cubic yards of fill to stabilize an existing private road; and to relocate the existing access channel by dredging approximately 700 cubic yards of material. Petitioners do not object to the placement of the 22 cubic yards of fill. During the review process, the Department identified several deficiencies in the proposal which it required be modified before a permit could be issued. Hunt agreed to comply with all of the Department's modifying requirements. As a result, in its amended form the proposal calls for the dock to be reduced in size from 5,080 square feet to approximately 3,800 square feet; access points to be reduced from four to three; the installation of a flushing system consisting of a 30 inch culvert between the west end of the canal and the mangrove swamp to the north to enhance the water quality in the artificial canal; the submittal of historical information to demonstrate the existence of a historic canal which would support maintenance dredging; and the submittal of a mitigation proposal for the seagrasses which would be destroyed by the dredging of a new channel and for the mangroves to be trimmed to facilitate the dock construction. The revised application also sought permission to construct a previously approved (different permit) boardwalk, the mitigation for which has been completed and is apparently successful. This mitigation is located in the northern boundary of the Hunt property. The wetlands area adjacent to Hunt's north property line is a Class II, Outstanding Florida Water, (OFW). The property in issue is located contiguous to Sarasota Bay, a Class II water body designated as an OFW). This portion of the bay is not approved for shellfish harvesting. Sometime between 1951 and 1957, a channel was dredged from the Intracoastal Waterway running generally north and south in the bay, west across approximately 400 feet of bay bottom into what was then a mangrove forest on the east side of Longboat Key. The westernmost 1400 foot extension of that channel into the forest is the artificial canal in issue which receives untreated storm water runoff from Jungle Queen Way, the roadway to the south of the canal. The canal is a Class III water and is not an OFW. Approximately 1,225 feet of the southern shoreline of that canal is seawalled, with approximately 35% of the southern shoreline having mature mangrove trees along it. The entire northern shoreline is vegetated by mature mangrove trees. There is no seawall on the northern shore. The canal varies in depth from less than one foot at points to a maximum of 7 1/2 feet at other points. As a result of shoaling at the canal juncture with the bay, a sand spit has formed, and at low tide, water depth is minimal but allows the passage of shallow draft vessels if their motors are raised. The original channel has silted in to a great degree and has become vegetated by approximately 1,350 square feet of various shoal grasses. It is home to several species of water animal including crown conch, lightning whelk, venus sunray clams, jingle shell, banded tulip snail and common nassa snail as well as supporting a diverse and abundant group of bottom dwelling organisms. The grass beds are fish habitats as well as nursery and feeding grounds and fish species present include some important to commercial and sport fishing. Though the remains of the original channel are often indistinct and difficult to define, the Department, in its analysis of the application for permit, determined from a review of the documentary evidence presented , and it is also found here, that a historic channel exists as described, and is navigable at least fifty percent of the time. As such, the Department concluded that that channel qualified for the maintenance dredge exemption. The Department also concluded that a minimum amount of dredging would be required to clear the historic channel sufficiently to allow boats to utilize it during a full range of tidal conditions. The seagrass beds currently existing in the historic channel would be substantially damaged by a maintenance dredging in the area. Though the Department has no authority to require mitigation for this impact should Hunt exercised its right to maintenance dredge, as an alternative, Hunt proposed to dredge a hook shaped channel curving to the north around that portion of the historic channel which penetrates the grass beds. This alternative site is also located in Class II waters and an Outstanding Florida Water. Dredging at the alternative site would displace much the same amount of material, (approximately 700 cubic yards), and the resultant channel would be approximately the same length, width, and depth overall. The alternative site will cross an area which contains a shoal grass, Cuban Shoalweed, but utilization of this site will have a substantially lesser impact to the overall seagrass population than would dredging of the historic channel. If Hunt chooses to utilize the alternative route, it would have to comply with the Department's mitigation requirements which include transplanting the displaced grass from the alternative channel to another location. The conditions for the mitigation were developed by Department personnel in conjunction with the Department of Natural Resources whose personnel have agreed to participate in the transplantation. Hunt has agreed to undertake additional mitigation planting regardless of whether the transplant is successful. The Department has determined that Hunt's total mitigation program is sufficient to offset the adverse impacts of the proposed dredging. Any sea grasses in the area of the channel will be protected by the installation of signs indicating their location. Speed will be limited by the installation of "No Wake" zone signs, and, in addition, the natural dog-leg in the channel should minimize the impact to adjacent shorelines and reduce the potential for shoaling or erosion. The Department gathered water quality data for the area from 1988. This is consistent with the current statutory and rule criteria which permits the use of data existing in the year prior to application. To supplement this, however, the Department also required that Hunt submit water quality data for the actual project site as a part of the application process. From this input, existing ambient water quality standards were established. To insure that these existing ambient water quality standards within the OFW are maintained during construction, the Department has established a mixing zone and has indicated a requirement for the use of double turbidity curtains. Additional safeguards include limiting dredging to periods of low tide. The Department has concluded that these prosthetic activities will most likely result in maintenance of the water quality standards required for Class II and OFW. Any diminishment of those standards would be of limited duration. The Department was also satisfied that the project would not adversely impact in this area after construction was completed and the facility in operation. In support of this position, the Department relied on evidence tending to show that the design of a culvert proposed for incorporation into the project should significantly improve flushing of the water within the canal. Pollutant loading to the system should be reduced as a result of the biological filtration of the mangrove community which will absorb many of the excess nutrients currently in the canal water, and the removal of suspended solids. Expert evidence on the subject indicates that flushing time, currently estimated at 9 days, will be reduced to less than 4 days. Polluting activities, such as fueling facilities, live-aboards, and major repair and maintenance of boats in the canal will be prohibited. Any pollutants not removed by the natural filtration process described above will, therefore, remain in the canal water for less time than before. If vessels are docked in the canal, the minimal amount of resulting oil and grease pollution should not be sufficient to degrade water quality in either the canal or the bay to a point below acceptable established standards. In fact, such impact should be both non-detectable and non-measurable.. Hunt's plan calls for the removal of approximately 20 of the approximately 2,400 mangrove trees and the trimming of approximately 230 additional ones. Though this trimming, as a part of an exempt activity, is also exempt, and as a result, mitigation in not required, Hunt indicates its intention to plant 3 trees for every tree removed or trimmed, and this proposal, considered acceptable to the Department, has been incorporated as one of the permit conditions. The new mangrove area to be planted in mitigation should be fully established within 3 years of planting and will provide the same beneficial function as the replaced trees. Hunt's mitigation planting for the previously mentioned boardwalk project has been successful. To protect the manatee population as much as possible, the Department has also included conditions to the permit requiring the posting of manatee awareness signs along the canal and channel and the installation of a permanent informational display at the facility. These measures, though no guarantee of compliance by individual boaters, are currently the most effective safeguards short of prohibition of boat activity. The Department has concluded, and it is so found, that, considering the proposed project against the statutory criteria relating to dredge and fill permitting of this nature, the project, as conditioned, is in the public interest and would have no cumulative impact on the environment in the area. When the 36 special conditions attached to the permit by the Department are complied with, the effect on fish and wildlife resources in the area should be beneficial. As a result of the mitigation activities, both mangrove and seagrass populations should be increased and the shoreline enhanced. Water quality in the canal should be significantly improved above existing conditions, and the abandonment of the historic maintenance dredging operation, with its associated impacts, is clearly in the public interest. The incorporation of a permit condition precluding any subsequent maintenance dredging in the historic channel upon completion of the relocation is a safeguard clearly in the public interest. The evidence also indicates, supporting Departmental findings to that effect, that the project will not adversely affect the public health, safety, welfare or property of others; nor will it adversely affect the conservation of fish and wildlife, endangered, threatened or other. It will not adversely affect navigation or flow of water or cause harmful erosion or shoaling. It will not adversely affect fishing or recreational values or marine productivity in the area; nor will it endanger significant historical or archaeological resources which exist currently in the area.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered in this case granting a Dredge and Fill permit to Hunt Building Corporation consistent with the terms and conditions outlined in the Department's Intent to Issue, dated March 29, 1990, under file NO. 41-1542543. RECOMMENDED this 3rd day of January, 1991, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of January, 1991. APPENDIX TO RECOMMENDED ORDER IN CASES NO. 90-2350 & 90-2736 The following constitutes my specific rulings pursuant to S 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR PETITIONERS, MANASOTA AND MANATEE: 1. Accepted. 2(a) - (e). Accepted and incorporated herein. Accepted and incorporated herein. Accepted. & 6. Accepted and incorporated herein. Accepted. - 12. Accepted and incorporated herein. Rejected as contrary to the evidence. Accepted. - 17. Accepted and incorporated herein. Accepted. - 22. Not appropriate Findings of Fact. Should be in Conclusions of Law. 23. - 26. Rejected. 27. - 30. Accepted and incorporated herein. 31. - 33. Accepted. Accepted except for last clause. Not a Finding of Fact but a comment on the state of the evidence. Rejected. Not proven. Not a proper Finding of Fact and not supported by authority. Accepted and incorporated herein except that the canal is a Class III water body. Accepted and incorporated herein. Not a Finding of Fact but a Conclusion of Law. Rejected. Accepted. Accepted but not determinative of any issue of fact or law. Ultimate Fact. Rejected. FOR RESPONDENT HUNT Accepted and incorporated herein. & 3. Accepted and incorporated herein. 4. & 5. Accepted and incorporated herein. 6. & 7. Accepted and incorporated herein. 8. - 10. Accepted and incorporated herein. 11. & 12. Accepted and incorporated herein. 13. Repetitive information. 14-1 & 2. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 22. Accepted and incorporated herein. Accepted and incorporated herein. - 28. Accepted and incorporated herein. FOR RESPONDENT DEPARTMENT: 1. - 5. Accepted and incorporated herein. 6. - 8. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. - 18. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 22. Accepted and incorporated herein. 23. & 24. Accepted. Accepted and incorporated herein. - 31. Accepted and incorporated herein. 32. Accepted and incorporated herein. COPIES FURNISHED: Martin Rosen 672 Jungle Queen Way Longboat Key, Florida 34228 Thomas W. Reese, Esquire 123 Eighth Street North St. Petersburg, Florida 33701 Patricia Petruff, Esquire John V. Quinlan, Esquire Dye & Scott, P.A. P.O. Box 9480 Bradenton, Florida 33506 Cecile I. Ross, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel DER 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57403.813
# 1
FRANCELL FREI vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002404 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002404 Latest Update: Feb. 14, 2006

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242
# 2
DIANA GOLDBERG vs THE CITY OF PORT ST. LUCIE AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 16-001018 (2016)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 19, 2016 Number: 16-001018 Latest Update: Jan. 10, 2017

The Issue The issue to be determined is whether Application No. 090107-1 for Environmental Resource Permit No. 56-03461-P and the Sovereignty Submerged Lands Public Easement for the Crosstown Parkway Extension should be issued as proposed in the notice issued by the South Florida Water Management District.

Findings Of Fact The Parties Petitioner resides in the City of Port St. Lucie, with a primary residence at 6470 Northwest Volusia Drive, Port St. Lucie, Florida. Petitioner frequents the area to be affected by the Proposed Project and uses the established Savannas Preserve State Park Halpatiokee Trail (“Halpatiokee Trail”) for birdwatching and engaging in activities, including lectures and tours, related to native plants found in the vicinity of the Halpatiokee Trail and the Savannas Preserve State Park. Intervenor is a 501(c)(3) corporation with its principal place of business in the City of Port St. Lucie. Intervenor’s standing was not challenged at the final hearing. The City is a Florida municipal corporation and the applicant for the Permit. The District is a water management district created by section 373.069, Florida Statutes. It has the responsibility to conserve, protect, manage, and control water resources within its geographic boundaries. See § 373.016, Fla. Stat. The District has the power and duty to exercise regulatory jurisdiction over activities subject to the Permit pursuant to chapter 373, Part IV, and to apply and implement statewide environmental resource permitting rules, including Florida Administrative Code Chapter 62-330. § 373.4131(2)(a), Fla. Stat. In implementing responsibilities with regard to ERPs, the District has developed and adopted the ERP Applicant’s Handbook - Volume I (“A.H.”) to provide standards and guidance to applicants. § 373.4131(1)(a)9., Fla. Stat. The District also performs staff duties and functions on behalf of the BTIITF related to the review of applications for authorization to use sovereignty submerged lands necessary for an activity regulated under part IV of chapter 373 for which the District has permitting responsibility. § 253.002(1), Fla. Stat. The District has been delegated the authority to take final agency action, without any action by the BTIITF, on applications for authorization to use sovereignty submerged lands for any activity for which the District has permitting responsibility. § 253.002(2), Fla. Stat.; Fla. Admin. Code R. 18-21.0051(2). Background In 1980, the City had a population of approximately 20,000 residents. The City presently has a population of approximately 179,400 residents and is anticipated to reach 225,000 by 2035. The North Fork of the St. Lucie River (“NFSLR”) runs through the City in a general north-south direction. The City is divided by the NFSLR, with roughly two-thirds of the City being west of the NFSLR, and one-third of the City being east of the NFSLR. The NFSLR in the area of the Proposed Project is an Outstanding Florida Water Body and an Aquatic Preserve. The NFSLR within the City is spanned by two bridges linking and providing access to the two sides of the City. The southernmost bridge is the St. Lucie Boulevard Bridge, a six- lane bridge with three lanes in each direction. The northernmost bridge is the Prima Vista Boulevard Bridge, a four- lane bridge with two lanes in each direction. Both of the existing bridges, and intersections around the bridges, currently operate at peak hours with a level of service of “F”, which is the lowest level of service classification assigned by the Florida Department of Transportation. In addition to traffic congestion, the two existing bridges have been deemed to be deficient in matters of public health and safety, including emergency response times and the need for prompt evacuation in the event of a hurricane or a nuclear incident at the nuclear power plant on nearby Hutchinson Island. Planning The City first identified a third east-west crossing of the NFSLR in its 1980 Comprehensive Plan. A third crossing has been included in each revision to the Comprehensive Plan since that time. In January 2009, the City submitted a conceptual permit application for the Crosstown Parkway Extension to the District. The 2009 application included six proposed bridge alignment alternatives, designated as: 1(C); 1(F); 2(A); 2(D); 6(A); and 6(B). In order to evaluate alternatives for the proposed third crossing, the six alternatives were subjected to environmental assessments which included “purpose and need” considerations. The Proposed Project was evaluated by means of a Project Development and Environmental Study, and the City, in cooperation with the Florida Department of Transportation and the Federal Highway Administration, prepared an Environmental Impact Statement (“EIS”) pursuant to the National Environmental Policy Act. The City, along with Federal and state agencies, participated in the Efficient Transportation Decision Making Process (“ETDM”) to evaluate the alternative east-west corridors crossing the NFSLR. As part of the ETDM process, modifications to eliminate or reduce impact were analyzed, including widening the Prima Vista Boulevard and Port St. Lucie Boulevard bridges, construction of a tunnel, and construction of second decks on the existing bridges. For various legitimate reasons, those options were rejected. The EIS considered each of the proposed bridge alignment alternatives. Each of the alternatives would have affected the NFSLR Aquatic Preserve, though in differing degrees. The analysis of the six alternatives in the EIS was performed using three overall categories: socioeconomic; biological environment; and physical environment. Environmental impacts in terms of acreage and wetland functions were considered. The EIS also considered public health, safety, and welfare considerations as socioeconomic impacts of the six alternatives. Alternative 1(C) was ultimately identified as the preferred alternative corridor in the EIS. In February 2014, the City, the Florida Department of Transportation, and the Federal Highway Administration collectively chose Alternative 1(C) as the preferred route for the Crosstown Parkway Extension. The City amended the permit application in 2014 to request authorization for the construction of alternative 1(C). That amended application is the subject of the proposed agency action at issue. Alignment The existing Crosstown Parkway begins at the interchange of Interstate 95 on the west side of the City, and extends east to Manth Lane. The proposed Crosstown Parkway Extension would extend the existing Crosstown Parkway from its current terminus at Manth Lane for a distance of approximately 1.5 miles to the east side of Floresta Drive, then across a 4,000-foot bridge section over the NFSLR, ending at U.S. Highway 1. The proposed bridge is to be slightly north of midway between the existing bridges. The proposed Crosstown Parkway Extension bridge will have three lanes in each direction, with bicycle lanes and multi-use paths. Petitioners contend that Alternative 6(A) should have been selected as the preferred alignment. Alternative 6(A) would impact the NFSLR Aquatic Preserve and wetlands, though to a lesser extent, but would have far greater impacts to residential communities on both sides of the NFSLR. More to the point, the City presented a prima facie case for the selection of Alternative 1(C) that included considerations of traffic flow, ease of evacuations, hospital access, and impacts to residential communities, all of which are “non-environmental safety factors” that are appropriate for consideration. See Fla. Bay Initiative, Inc., et al. v. Dep’t of Transp. and So. Fla. Water Mgmt. Dist., Case No. 95-5525 et seq. (DOAH Apr. 11, 1997; SFWMD June 23, 1997). Although Petitioners demonstrated that Alternative 6(A) would have fewer environmental effects, they failed to produce substantial competent evidence to counter the safety and public interest factors that are to be weighed and balanced in conjunction with the District’s evaluation of the Permit. The Environmental Resource Permit The proposed Crosstown Parkway Extension corridor includes portions of the NFSLR, Evans Creek, the Coral Reef Waterway, and associated floodplains. The Proposed Project area involves approximately 91.53 acres of development associated with the Crosstown Parkway Extension. Permanent in-water impacts include two sets of pilings. The total area of the pilings is 493 square feet, or 0.0113 acres. Construction of the Crosstown Parkway Extension bridge will involve secondary impacts resulting from shading of the water and benthic riverbed from the bridge, and temporary impacts related to construction. The application includes a 2.134 acre sovereignty submerged lands public easement. Approximately 1.44 acres of the Proposed Project will be constructed in, on, or over sovereignty submerged lands within the NFSLR. The difference in acreage is to account for temporary use of sovereignty submerged lands for construction and maintenance purposes. The area of the Proposed Project includes 14.202 acres of land owned by the BTIITF that are managed as part of the Savannas Preserve State Park. Those lands are not submerged. Authority to grant approval to use non-submerged state lands has not been delegated to the District, is not incorporated in the proposed agency action, and is not at issue in this proceeding. The City has applied for an easement for those state-owned lands from the Department of Environmental Protection (“DEP”). Water Quality and Water Quantity From the standpoint of water quantity permit criteria, the Proposed Project meets the discharge rate, design storm, floodplain encroachment, and flood protection criteria set forth in the ERP rules. The Proposed Project is divided into five stormwater basins. The stormwater management facilities are designed and permitted to provide water quality treatment and attenuation, including wet detention and dry retention areas. Stormwater from the bridge itself will not be drained into the waters of the NFSLR, but will be routed to the management facilities for treatment. The Permit authorizes the required water quality treatment volume of 2.5 inches times the percent of impervious area. The City has agreed to provide 50 percent more water quality treatment volume than is required by the permitting criteria. As to temporary impacts, the Permit includes implementation of a pollution prevention plan/turbidity and erosion control plan with additional conditions requiring compliance with water quality criteria during construction of the Proposed Project. By stipulation of the parties, the City has provided reasonable assurances to satisfy applicable water quality criteria pursuant to rule 62-330.301(1), and has provided reasonable assurances of compliance with rule 62-330.301(1). The Proposed Project is located within the watershed of DEP waterbody/WB ID/number 3194, the North St. Lucie Estuary, which has been identified as impaired for dissolved oxygen, nutrients, and fecal coliform. Since the existing ambient water quality of the receiving waters is impaired for nutrients, the City is required, pursuant to rule 62-330.301(2), to implement measures that will result in a net improvement of the water quality in the receiving waters for nutrients. The Stormwater Management Report, sections 3.1.6 and 4.4, demonstrate that the stormwater management system proposed for the Crosstown Parkway Extension will provide greater removal of nutrients, including nitrogen and phosphorus, than currently exists, which will result in a net improvement of water quality. Thus, the City has established, through its prima facie case, that it meets the standards of rule 62-330.301(2). Petitioners failed to prove, by a preponderance of persuasive competent and substantial evidence, that the stormwater management system would be ineffective to remove nutrients as proposed. Natural Resources There are no seagrasses in the NFSLR in the vicinity of the proposed Crosstown Parkway Extension bridge out to the area subject to potential secondary impacts. Although Ms. Scotto speculated as to the existence of polychaete worms in the area, she had no direct knowledge of any benthic resources at the location. Wetlands within the Crosstown Parkway Extension area can generally be described as freshwater marsh, floodplain forest, and mixed wetland hardwoods. In addition, mangroves fringes exist along the edges of the open water bodies. Impacts Direct Impacts The Proposed Project will result in direct impacts to 7.9 acres of wetlands and 1.18 acres of surface waters with additional secondary impacts. The area of submerged lands physically impacted by the Proposed Project is limited to the pilings that support the bridge, which constitute a total of 0.29 acres of direct impacts. Wetland fill impacts of 1.53 acres will occur where the Crosstown Parkway transitions from a bridge to a roadway, to a width of 225 feet within the U.S. Highway 1 right-of-way. The low level of the bridge structure will result in canopy removal within forested wetlands, and shading of vegetation beneath the bridge structure. As a result, it was assumed that all wetlands underneath the bridge impacted by shading of the structure would be directly and fully eliminated. Petitioners assert that the permit application evaluation should have taken into account direct and secondary impacts to threatened plant species listed by the Department of Agriculture and Consumer Services in Florida Administrative Code Rule 5B-40.0055, particularly the rose pogonia and nodding pinweed. However, the District does not have authority to consider such species in the context of an ERP. Secondary Impacts Secondary impacts are not direct impacts of the Proposed Project, but are those adverse effects to the functions of the surrounding wetlands and habitats that would not occur but for the construction of the Proposed Project. Secondary impacts include shading from the Crosstown Parkway Extension bridge, and light and noise that could deter use of the area by fish and wildlife. Secondary impacts to wetlands were assessed in two zones extending outward from the direct impact area. The first zone extends from 0 to 50 feet from the bridge footprint, and the second zone extends from 50 to 250 feet from the bridge footprint. There was no persuasive competent and substantial evidence that the secondary impacts of the Proposed Project would have any measurable impact on surface waters, including temperature and salinity. The City provided reasonable assurance that the secondary impacts that would be caused by the Proposed Project will not cause or contribute to violations of water quality standards, or adversely affect the functions of adjacent wetlands or other surface waters. Although there will be some locally evident impact to the functions of wetlands within the zones of secondary impact, because the City meets the “Opt-Out” provisions discussed below, the City is not required to implement practicable design modifications to reduce or eliminate such impacts. There was no persuasive competent and substantial evidence that the secondary impacts of the Proposed Project would affect the functions of wetlands outside of the zone of secondary impacts. There was no persuasive competent and substantial evidence that the construction, alteration, and reasonably expected uses of the Crosstown Parkway Extension would adversely impact the ecological value of the uplands to aquatic or wetland-dependent listed species for enabling existing nesting or denning by these species. The loss of canopy, including issues of detrital export and functions related to downstream systems, were accounted for in the UMAM calculations for quantifying the functional loss of resource values resulting from the Proposed Project. Petitioners stipulated to the UMAM scores related to direct impacts of the Proposed Project. Petitioners disagreed with the UMAM scores related to secondary impacts because they were not “considered for the impacts to those [Department of Agriculture and Consumer Services]-listed threatened and endangered plants.” The ERP permitting criteria take into account a comprehensive list of invertebrates, fish, amphibians, reptiles, birds, and mammals that are to be considered in the evaluation of secondary impacts that may result from a project. See A.H. Table 10.2.7-1. The City demonstrated, and Mr. Braun acknowledged, that the permitting standards do not list plants as a matter for consideration, either generically or by species. The suggestion that the evaluation of ecological values must include, by implication, species of plants is not accepted.3/ Mr. Braun also testified that the only issues in dispute regarding the quantification and mitigation of secondary impacts were those pertaining to the headwaters of Hogpen Slough. It was his opinion that the collection and treatment of stormwater from the bridge and road in the permitted stormwater basins will divert and interrupt sheet flow that currently flows from U.S. Highway 1 and undeveloped property to the north into the Hogpen Slough drainage area, and that such effects will alter the salinity envelope in Evans Creek and impact the fishery nursery in the area. However, Mr. Braun admitted that “there has been no modeling that would show how the effect of the changes in the water, how they will be effected by the project.” The basic thrust of Mr. Braun’s testimony was best characterized by the following exchange: Mr. Fumero: You don’t have any analysis to show that what's currently contemplated will result in a salinity imbalance? Your point is that the Applicant should demonstrate, should provide some analysis showing that it will not, correct? Mr. Braun: That's correct.[4/] In response to Petitioners’ concerns with the impacts to Hogpen Slough, the City demonstrated that the Hogpen Slough drainage basin encompasses an area of almost 700 acres, and extends for a mile and a-half to two miles east of the area discussed by Mr. Braun. Upon construction of the Proposed Project, the areas that currently drain to Hogpen Slough will continue to drain to Hogpen Slough, with enhanced water quality treatment and attenuation for the additional impervious area created by the road widening at the intersection with U.S. Highway 1. Thus, the Proposed Project will have a de minimis, if any, effect on the overall quantity of water draining from the Hogpen Slough drainage basin to Hogpen Slough, with the stormwater from the Proposed Project itself being subject to an enhanced degree of water quality treatment. Under the burden of proof applicable to this proceeding, as discussed in the Conclusions of Law herein, Mr. Braun’s concern as to the effect of the Proposed Project on Hogpen Slough, without more, is insufficient to support a finding as to any adverse secondary impacts. Cumulative Impacts The Proposed Project is considered not to have unacceptable cumulative impacts if mitigation offsets adverse impacts within the same basin where the impacts occur. As set forth herein, the proposed mitigation is located within the same basin as the impacts from the Proposed Project. Mitigation The City proposes to provide both on-site and off-site mitigation to offset impacts of the Proposed Project. The City has proposed proprietary mitigation for the easement to cross state lands and regulatory mitigation to compensate for impacts to natural resources. The ecological values of the areas affected by the Proposed Project’s direct, secondary, and temporary impacts to freshwater wetlands and surface waters, and the mitigation needed to offset those impacts, was determined using UMAM. UMAM is authorized by statute and adopted by rule. The undersigned accepts UMAM as an accurate and representative measure of the impacts of the Proposed Project. In order to calculate UMAM functional loss scores, and thereby the mitigation necessary to offset impacts, all areas under the Crosstown Parkway Extension bridge were accounted for as though they were to be filled in their entirety, with 100 percent functional loss. The loss of canopy was accounted for and included consideration of detrital export and functions related to downstream systems. In calculating the mitigation to be provided, the City developed a fictitious “hybrid corridor” that assumed the worst case scenario impacts of each of the six build alternatives identified in the 2009 application. That hybrid corridor included greater impacts than any single alternative corridor, including the Alternative 1(C) corridor at issue. That hybrid corridor was then used as the basis for the development of the mitigation plan used for the Alternative 1(C) corridor. As such, the mitigation proposed is conservative. Applying the UMAM methodology, it was determined that direct impacts would result in 6.64 functional loss units, secondary impacts would result in 2.47 functional loss units, and temporary impacts would result in 0.27 functional loss units, for a total of 9.38 functional loss units. Platt’s Creek To mitigate for the freshwater wetland and surface water impacts, the City constructed the Platt’s Creek mitigation area as authorized by District Permit No. 56-03199-P. Platt’s Creek, located approximately five miles upstream from the project and adjacent to the NFSLR, was an orange grove containing upland habitat and a retention pond. The Platt's Creek project, a joint mitigation area with St. Lucie County, is designed to restore and create hydric hammock, floodplain forest, and freshwater marsh. The mitigation at Platt’s Creek involves the same habitats that are being impacted by the project. Although Platt’s Creek is not located in the NFSLR Aquatic Preserve, it is located upstream of the Proposed Project, within the same basin as the Proposed Project’s impacts, and will provide downstream benefits to the Aquatic Preserve. The Platt's Creek project also provides a regional benefit to the NFSLR by improving water quality. The UMAM calculation established that 9.38 mitigation units would be required to offset the functional loss from all of the Proposed Project impacts. The City dedicated 11.25 functional units from the Platt’s Creek mitigation area to offset the impacts, which is in excess of the requirement. The City has completed construction and planting at Platt’s Creek, and is now monitoring success of the completed mitigation work. Pursuant to the Permit, St. Lucie County is responsible for long-term operation and maintenance of the Platt’s Creek mitigation area. Bear Point As mitigation to offset direct, secondary and temporary mangrove impacts, the City purchased mitigation credits from Bear Point Mitigation Bank located in the Indian River Lagoon. Bear Point provides the same type of mangrove habitat as that affected by the Proposed Project. Using the modified Wetland Rapid Assessment Procedure, which was the method used to determine functional units when the Bear Point Mitigation Bank was created, it was determined that 0.26 functional units would be required to offset the worst case hybrid corridor mangrove impacts applied to the Proposed Project. The City purchased 0.50 functional units from the Bear Point Mitigation Bank to offset the 0.26 acres of functional loss, which is in excess of the requirement. The Proposed Project is in the Mitigation Service Area for the Bear Point Mitigation Bank. The proposed mitigation is within the same basin as the Proposed Project’s impacts. Mitigation Conclusion The City established, by a preponderance of competent substantial evidence, that the mitigation provided was sufficient to offset the environmental impacts. Petitioners failed to counter the City’s case. Mr. Braun’s concerns with the proposed mitigation were primarily directed to its failure to account for impacts to plants species as discussed herein. Ms. Scotto expressed no opinion as to whether the mitigation provided meets the ERP standards, whether the mitigation provided meets the standards for proprietary authorization, or whether the mitigation is consistent with the NFSLR Aquatic Preserve Management Plan. She did not review mitigation for secondary impacts. Ms. Goldberg, noting the extent of the proprietary mitigation provided, testified that mitigation should not be a “Christmas present” for agencies. She also noted that Platt’s Creek does not match the maturity and diversity of the impact areas. However, she did not dispute the UMAM scores that formed the basis for the mitigation. Elimination or Reduction of Impacts The City reduced the width of the main section of the bridge from 143 feet to 103 feet, resulting in a 3.27 acre reduction of impacts, an approximate 30-percent reduction. The evidence was convincing that the bridge could not be further reduced in width without compromising safety and functionality. The City proposed construction methods, including the use of top-down construction or construction by use of temporary pile-supported structures, designed to reduce temporary construction-related impacts. The City has committed to the installation of specialized light fixtures that direct light onto the pavement only, which will reduce light trespass on adjacent habitats. Impacts were eliminated and reduced through the location and design of the stormwater ponds as described in the Permit. No evidence was adduced to counter the prima facie case on that issue. Although Alternative 1(C) had greater environmental impacts than other build alternatives, the City demonstrated by a preponderance of the competent substantial evidence that non- environmental safety factors, including traffic flow, ease of evacuations, hospital access, and impacts to residential communities, precluded further efforts to avoid impacts through the selection of a different corridor. Opt-Out Provision A.H. section 10.2.1.2(b) provides that: The Agency will not require the applicant to implement practicable design modifications to reduce or eliminate impacts when: * * * b. The applicant proposes mitigation that implements all or part of a plan that provides regional ecological value and that provides greater long term ecological value than the area of wetland or other surface water to be adversely affected. Although the areas impacted by the proposed Crosstown Parkway Extension bridge are of high quality, the combination of using the Platt’s Creek Mitigation Area, the Bear Point Mitigation Bank, and the NFSLR Aquatic Preserve Management Plan Projects, provides regional ecological value and greater long- term ecological value than the areas affected. Based thereon, the City was not required to implement practicable design modifications to reduce or eliminate impacts of the Proposed Project though, as indicated herein, it did so. Public Interest Balancing Test Portions of the Proposed Project are within Outstanding Florida Waters. Therefore, the City must provide reasonable assurances that the Proposed Project is clearly in the public interest, as described by the balancing test set forth in section 373.414(1)(a), rule 62-330.302(1)(a), and A.H. sections 10.2.3 through 10.2.3.7. To determine whether a regulated activity located in, on, or over wetlands or other surface waters is in the public interest, the following criteria must be considered and balanced: whether the regulated activity will adversely affect the public health, safety, or welfare or the property of others; whether the regulated activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; whether the regulated activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; whether the regulated activity will be of a temporary or permanent nature; whether the regulated activity will adversely affect or will enhance significant historical and archaeological resources; and the current condition and relative value of functions being performed by areas affected by the proposed regulated activity. Public Health, Safety, or Welfare or the Property of Others A.H. section 10.2.3.1 establishes four criteria to be balanced in order to determine if regulated activities will adversely affect the public health, safety, or welfare or the property of others. The evidence in this case failed to demonstrate that impacts resulting from the Proposed Project would affect waters subject to a shellfish harvesting classification (A.H. section 10.2.3.1(b)), would cause or alleviate flooding on the property of others (A.H. section 10.2.3.1(c)), or would result in environmental impacts to the property of others (A.H. section 10.2.3.1(d)). A.H. section 10.2.3.1(a) requires an evaluation of hazards or improvements to public health or safety. The Crosstown Parkway Extension is calculated to relieve traffic and access problems that have earned the existing roadway infrastructure linking the east and west sides of the City a service level of “F”. By so doing, the Crosstown Parkway Extension is designed to improve emergency response times and evacuation times. The proposed Crosstown Parkway Extension corridor involves the fewest overall impacts to residences, communities, and businesses. Petitioners assert that the Crosstown Parkway Extension will create health issues from vehicle emissions, and adverse effects to wildlife and habitat from light pollution. Those alleged impacts would apply to all of the build alternatives, including Petitioners’ preferred Alternative 6(A). Furthermore, Petitioners failed to provide any quantification of either the amount or effect of any such impacts. Finally, as to the alleged light pollution, the City incorporated design modifications to the bridge lighting system to reduce such impacts. There was insufficient evidence to support a finding that the Crosstown Parkway Extension will, on balance, adversely affect public health or safety. Although more directly relevant to the sovereignty submerged lands easement, the water quality enhancement projects, including the installation of baffle boxes, reestablishment of oxbows, and dredging of unsuitable sediments in Evans Creek, will maintain and improve water quality in the NFSLR and, as a whole, result in an improvement to the water quality of the NFSLR. Thus, reasonable assurance has been provided that the Crosstown Parkway Extension will not adversely affect public health, safety, or welfare or the property of others. Conservation of Fish and Wildlife The Endangered Species Biological Assessment Report submitted as part of the ERP application was comprehensive in its scope, assessing each of the bridge alternatives. The Report concluded that the Proposed Project would have no effect on any federally-listed plant species, “may affect but [was] not likely to adversely affect” listed species, including the smalltooth sawfish, eastern indigo snake, wood stork, and manatee, and would have no effect on any other federally-listed species. The area of the Proposed Project includes no designated critical habitat. The report further concluded that each of the build alternatives, including the Proposed Project, could affect several state-listed plant and animal species, but that the Proposed Project would affect no threatened or endangered species. As to those state-listed species, the Report concluded that efforts to avoid and minimize impacts to species and their habitats had been implemented, and that a mitigation plan had been developed to compensate for unavoidable impacts to wetlands and fish habitat. The Report, which is part of the ERP application, and is, by law, part of the City’s prima facie case, is accepted. The City agreed to perform surveys for protected species and implement measures designed to protect those species from direct project effects as described by the Fish and Wildlife Conservation Commission. There was insufficient evidence to demonstrate that the agreed-upon surveys and protective measures would be ineffective in preventing adverse impacts to the wildlife species of concern. Furthermore, the City incorporated design features and construction methodologies to reduce and eliminate impacts, and provided mitigation to replace functions provided to these species affected as a result of the project. More mitigation to provide habitat and improve water quality within or adjacent to the NFSLR and the Aquatic Preserve has been provided than was required. The mitigation provides regional ecological value and greater long-term ecological value than the wetlands to be impacted. There was insufficient evidence to support a finding that the Crosstown Parkway Extension will result in adverse impacts to the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters, or adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. Petitioners assert that various plant species listed by the Florida Department of Agriculture and Consumer Services will be impacted by the Proposed Project. As set forth previously, the plant species of concern to Petitioners are not species defined in the A.H., and are not species that are subject to consideration in the decision to issue or deny an ERP. As set forth in paragraphs 54 and 55 above, Petitioners also assert that the alteration of the inputs to Hogpen Creek would affect the salinity regime in the Evans Creek receiving waters, thereby adversely affecting fishery nursery areas. Petitioners’ argument was made without information on the volume of water to be discharged over what period of time, without information as to the size of the Hogpen Slough watershed, without information as to the stormwater system design, and without modeling that would show how the waters would be affected by the Proposed Project. In sum, the evidence as to adverse impacts to Hogpen Slough, and resultant effects on the conservation of fish and wildlife, was made without evaluation, and was entirely speculative. The City demonstrated that areas that currently drain to Hogpen Slough will continue to drain to Hogpen Slough, with enhanced water quality treatment, and with attenuation for the additional impervious area created by the road widening at the intersection with U.S. Highway 1. Thus, the preponderance of the evidence indicates that post-construction discharges of water to Hogpen Slough will offer greater benefits to the conservation of fish and wildlife than current discharges. The City has demonstrated, by a preponderance of competent substantial evidence, that the proposed Project will not adversely affect the conservation of fish and wildlife, or their habitats. Navigation, Flow of Water, or Erosion or Shoaling The Proposed Project will not prevent fishing, boating, or other forms of recreation in the NFSLR. A bridge hydraulic analysis demonstrates that the Proposed Project will not cause impacts to water levels, flow, or velocity of the NFSLR or other water bodies. Navigation will not be adversely impacted as the bridge span will be at least as high as other bridges on the NFSLR. The bridge will meet Coast Guard minimum clearances, and Coast Guard-required aids to navigation will be included. Navigation by canoes and kayaks will be improved because of the dredging of the unsuitable sediments and the placement of a new and more accessible canoe launch. The Permit requires the implementation of best management practices to prevent erosion and sedimentation during construction. The City has demonstrated, by a preponderance of competent substantial evidence, that the Crosstown Parkway Extension bridge would cause no adverse effect on navigation or the flow of water, or harmful erosion or shoaling. Fishing or Recreational Values or Marine Productivity The Proposed Project is expected to have no effect on fishing, sport or commercial fisheries, or marine productivity. Although recreational values and fishing may be affected during construction, such impacts are temporary. The long-term effects of the Proposed Project, which include those direct and secondary impacts caused by shading of the vegetative and benthic resources under and adjacent to the Crosstown Parkway Extension bridge, are offset by mitigation including the reconnection of oxbows, which is designed to improve water quality and provide habitat that was previously isolated, and sediment dredging at Evans Creek, which will also improve water quality, fish habitat, and recreational values. The new Americans with Disabilities Act (“ADA”)- compliant canoe/kayak launch will allow for improved and more accessible recreational use. As has been discussed at length herein, the evidence was insufficient to support a finding that the Proposed Project will be reasonably expected to eliminate or degrade fish nursery habitat, change ambient water temperature, change the normal salinity regime, significantly reduce detrital export, change nutrient levels, or otherwise have any adverse effects on populations of native aquatic organisms. Rather, with the mitigation proposed in terms of land acquisition, access enhancement, sediment removal and re-establishment of oxbows, water quality treatment projects, and the stormwater treatment and attenuation being provided, the City established that the Proposed Project would have no measurable adverse impact on fishing, recreational values, or marine productivity. There is no doubt that Petitioner’s enjoyment of the Halpatiokee Trail will be compromised. However, alternative, though more publically accessible areas for walking and canoeing will be provided. Petitioner was critical of the fact that the alternative areas would not be as wild and undeveloped as the existing trails and was particularly critical of the Savannas County Park Trail mitigation, since it is paved to provide access for handicapped nature lovers. This is, however, a balancing test. Based on the record as a whole, there was insufficient evidence to support a finding that the Proposed Project will, on balance, have an adverse effect on fishing or recreational values and marine productivity. Temporary or Permanent Nature The Proposed Project is of a permanent nature. Temporary impacts will occur during construction, but are considered less harmful than the permanent impacts as the temporary impact areas will eventually recover. Although there will be permanent habitat loss, such loss will be offset through mitigation. Historical and Archaeological Resources There was no evidence of significant historical or archaeological resources on or near the Proposed Project. Current Condition and Relative Value of Functions The current condition and relative value of functions is high, as demonstrated by the UMAM scores. This value is due to the location in the NFSLR Aquatic Preserve and state park, connectivity to other wetlands and surface waters, and utilization by fish and wildlife. To offset impacts to the current condition and relative value of functions being performed by areas affected by the Proposed Project, the City provided mitigation in excess of the rule requirements, including the purchase and enhancement of additional lands, and the construction of various types of water quality improvement projects. The mitigation projects and goals are described in the Aquatic Preserve Mitigation Plan. Public Interest Balancing Test - Conclusion The City has proven, by a preponderance of the competent substantial evidence adduced in this proceeding, that, upon balancing the impacts of the Proposed Project with its benefits, the activities authorized by the Permit will be clearly in the public interest. Sovereignty Submerged Lands The City requested an easement over 2.134 acres of sovereignty submerged lands. Approximately 1.44 acres of the 91.53-acre project will be constructed in, on, or over sovereignty submerged land. Permanent in-water impacts consist of two sets of piles to be installed in the Coral Reef Waterway, the NFSLR, and Evans Creek, with a total fill area within the sovereignty submerged lands of 492 square feet or 0.0113 acres. The submerged lands public easement is 157 feet wide, greater than the reduced 104-foot width of the Crosstown Parkway Extension bridge. The area of the easement in excess of the 1.44 acres over which the bridge will pass is to accommodate temporary construction and maintenance activities. Aquatic Preserve The area within the sovereignty submerged lands easement is in the NFSLR Aquatic Preserve. In order to obtain an easement in an aquatic preserve, the City is required to demonstrate that the benefits exceed the costs, and that the Proposed Project is consistent with the NFSLR Aquatic Preserve Management Plan. Consistency with the NFSLR Aquatic Preserve Management Plan is a component of the public interest assessment required by rule 18-20.004(2)(a)(3). Proprietary mitigation was proposed for recreation areas, water quality and quantity, wetlands, wildlife and habitat, floodplain social considerations, and relocations. Proprietary mitigation consistent with the NFSLR Aquatic Preserve Management Plan includes: the installation of baffle boxes within five waterways that discharge into the aquatic preserve. Baffle boxes are designed to slow the flow of water from upland and developed areas, allowing sediment to fall out before the water is discharged to the NFSLR. They are a proven and effective means of improving water quality in a receiving water body; the removal of muck and sediment from Evan’s Creek. The removal of such materials is designed to improve water quality, navigation, and habitat in Evans Creek; the construction of a new, ADA-accessible canoe/kayak launch to replace the current Halpatiokee launch that will be displaced by the Crosstown Parkway Extension, the creation of the ADA-compliant Savannas Recreation Area Trail between Savanna Road and Midway Road, and the improvement of the Savannas Preserve State Park Education Center. The Halpatiokee canoe/kayak launch was slated for closure by the DEP under any of the build alternatives. ADA-accessibility for the canoe/kayak launch and recreation trail, along with improved canoe/kayak launch parking, will enhance public access to the NFSLR Aquatic Preserve and Savannas Preserve State Park5/; purchase and conveyance to the BTIITF of approximately 110 acres, including wetlands and uplands adjacent to the Aquatic Preserve at the Evans Creek, Crowberry, Brywood, Emerson, Highpoint, and Riverwalk sites. Acquisition also includes the Green River parcel in the Savannas Preserve State Park. Each of those sites was identified as priority acquisitions in the NFSLR Aquatic Preserve Management Plan or by the DEP. The conveyances also include an obligation for the City to remove exotic vegetation from the parcels over a period of five years; and oxbow reconnection and removal of accumulated sediments at Site 5 West and Riverplace Upstream, adjacent to the Aquatic Preserve, designed to improve water quality and habitat. Cost/Benefit Analysis Costs related to the 2.134-acre easement include reduced habitat at the bridge location, shading of the water column and areas of herbaceous and forested wetlands, including mangroves, pre-emption of public use, some of which is temporary and some of which due to the loss of functional use of the Halpatiokee Trail under the bridge, and reduced aesthetics. Those costs, except for the Halpatiokee Trail impacts, would be evident to varying degrees at each of the proposed build alternative routes. The City demonstrated that the Crosstown Parkway Extension is a public necessity for which no other reasonable alternative exists. The Crosstown Parkway Extension provides the most efficient means of addressing current traffic congestion, the severe traffic congestion anticipated in the future, and other access and evacuation issues described herein, with the least overall impact to the public. The Crosstown Parkway Extension will not involve dredging or filling in the Aquatic Preserve. Although there will be pilings in the Aquatic Preserve, pilings are not “fill” pursuant to rule 18-20.003(27). The DEP and the City entered into a Memorandum of Understanding (“MOU”) that identifies projects that the City committed to undertake, and lands that the City committed to convey to state ownership to provide for proprietary and sovereignty submerged lands mitigation. The MOU projects are consistent with the approved NFSLR Aquatic Preserve Management Plan. Consistency with an adopted management plan is given great weight when determining whether the project is in the public interest. As set forth above, benefits of the Proposed Project to the Aquatic Preserve include enhanced public access, improved and enhanced water quality, and enhancement and restoration of natural habitats and functions. The City also proposes to convey approximately 110 acres to the BTIITF. The City has proven, by a preponderance of the competent substantial evidence adduced in this proceeding, that, upon balancing, the social, economic, and environmental benefits associated with the Proposed Project, including the extensive proprietary mitigation being provided, far exceed the costs of the 2.134-acre submerged lands easement. Findings of Fact - Conclusion Based on the foregoing Findings of Fact, and as supported by a preponderance of the competent, substantial, and credible evidence, the standards and conditions for issuance of the Permit as set forth herein have been satisfied.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED that the South Florida Water Management District enter a final order approving the issuance of Environmental Resource Permit and Sovereignty Submerged Lands Public Easement, Permit No. 56-03461-P, to The City of Port St. Lucie, on the terms and conditions set forth in the Notice of Consolidated Intent to Issue and Staff Report, as modified, and the complete Application for Environmental Resource Permit. Said approval shall not be construed as relieving The City of Port St. Lucie from obtaining an upland easement for the 14.202 acres of non-submerged state-owned land required for the Proposed Project. DONE AND ENTERED this 8th day of November, 2016, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of November, 2016. 1/ T.162:22-181:19.

USC (1) 16 U.S.C 668 Florida Laws (19) 11.25120.52120.54120.569120.57120.6014.20220.331253.002258.36258.42267.061373.069373.079373.413373.4131373.4136373.414403.412
# 3
MELVIN J. LANEY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-000871 (1979)
Division of Administrative Hearings, Florida Number: 79-000871 Latest Update: Oct. 28, 1981

Findings Of Fact Petitioner Melvin J. Laney is the owner of Rodriguez Key which is located approximately one and one-half miles from Key Largo, Florida, in the Atlantic Ocean. The island consists of about 170 acres and is undeveloped. It is approximately 9/10 of a mile long and 3/10 of a mile wide. By application, dated July 31, 1978, Petitioner requested a permit from Respondent Department of Environmental Regulation (DER) to conduct specified activities incident to the establishment of a primate breeding and research farm. The proposed activities included the construction of a floating pier, filling a sunken barge which is located 100 feet from the shoreline with coral rock and riprap, constructing two buildings on stilts on the east end of the island, clearing some 8.9 acres of black mangroves to provide trails for the placement and servicing of cages, installation of prepackaged waste treatment units, and temporary cages. (Testimony of Petitioner, Exhibits 1,8) DER's South Florida branch office personnel reviewed the application and issued an intent to deny the requested permit by letter of March 8, 1979, for the reason that Petitioner had failed to obtain local approval required pursuant to Section 253.124,. F.S., and that violations of State water quality standards could be expected by the proposed project. Further, the notice noted that the project would result in adverse effects to marine productivity and wildlife population contrary to the public interest under Chapter 253. Petitioner thereupon requested a hearing. (Petition, Exhibit 6,8) Petitioner plans to bring rhesus, squirrel, and other research primates into the State for the purpose of establishing a breeding and research farm on Rodriguez Key. The primates would be owned by sponsors who would pay Petitioner to provide housing, care and associated services. The project is designed to meet the needs of researchers for the testing of vaccines and other scientific purposes. There is currently a shortage of primates in this country due to a 1978 embargo on the export of such animals by the government of India who had previously been the primary supplier of research primates. (Testimony of Petitioner, Darrow, Exhibit l) Petitioner intends to fill a partly sunken barge near the northeast shoreline with boulders and riprap, cover it with a concrete floor, and construct a floating pier approximately 130 feet long between the shore and the barge for off-loading of supplies and equipment. The project contemplates the construction of an animal care house and a residence, both to be placed on stilts which will each contain a maximum of 10,000 square feet of space. No filling or dredging is planned for either structure. This is a modification from the original permit application which called for some 3,000 cubic yards of fill at the building site. At the western end of the island, Petitioner plans to install 16 rows of prefabricated cages with 64 cages per row, which represents a total area of approximately 12.48 acres. About 4.16 acres of that area will be cleared or otherwise disrupted to place and connect the cage rows. The cages will be secured and there is little likelihood that the animals will escape. Under a current permit from the Fresh Water Game and Fish Commission, the holding cages must be constructed to withstand hurricanes, surge and wind, and provide adequate protection for the animals during such storms. They must also meet or exceed minimum pen specifications established by the Commission. The permit submitted in evidence expired on June 30, 1981. The cages will be prefabricated and placed on metal pilings which are attached to underground rock. There will be troughs located underneath a grate floor for animal wastes which will be collected and pumped to a sewage disposal system. In order to take supplies, materials, and animals to and from the cage area, Petitioner intends to clear a 20-foot wide perimeter "trail" around the island which would be attached at both ends by lateral similar trails. The total distance of the trails is approximately 9,000 feet. The need for a perimeter trail is to deliver materials on one side of the island, service the animals, and then leave by a different route for the purpose of transporting employees, ill animals, or transporting of any animal that might affect the control area for testing and conducting vaccine research. The perimeter trails are designed to be no closer than 75 feet from a red mangrove fringe border around the island. For transportation purposes, it is proposed to use gasoline powered "all terrain" wheeled vehicles which will traverse the trails along two parallel two-inch diameter cables suspended horizontally 36 to 48 inches above the ground level. The cables will be attached to concrete anchors consisting of four inch by four inch steel tubes which are placed at 100 foot intervals along the trails. The tubes will be either hand-driven into subsurface rock several inches or driven by means of a portable pile driver. The tubes will additionally be supported by a concrete block "dead man" attached to a 5/8-inch cable on either side of the tubes and placed underground. Turning platforms would be placed at trail intersections on top of the cable road so that a vehicle could drive upon the platform and execute a turn to a connecting cable road. The low pressure tread vehicles used to traverse the roads will be equipped with shoes or flanges on the inside of the tire rims to securely ride on the pretensioned cables. They will also have low pressure pneumatic tires. The vehicles will also be used in interior areas where mangroves are not present. They will ride on the ground or upon metal plates. These areas are covered with about 9,000 square feet of batis (saltwort) cover which eventually will be killed by vehicle use. Batis is important for sediment stabilization and its removal can cause siltation problems in waters surrounding the island. The need for a 20-foot swath for the cable road is explained by the fact that transport of the 17-foot cages must be accomplished by placing them sideways on the transporting vehicles in order to install and periodically provide service, repair or replacement. A soil study made in representative areas of Rodriguez Key except the west end shows that coral rock exists at levels of approximately 11 to 15 feet below the ground surface, thus necessitating the use of pilings for support purposes rather than shallow footings. Although no soil borings were taken at the west end of the island, the soil expert is of the opinion that the borings reflect general rock characteristics of the entire island. Petitioner's civil engineer who designed the current cable road system prepared several alternative methods of construction, and is of the opinion that suspension of the cables at a height of 15 feet instead of three to four feet as currently planned would be feasible except for cage servicing purposes. A further alternative that was proposed by Petitioner's engineer expert is to place the cages at the east end of the island and utilize a boardwalk constructed of an eight-foot wide precast concrete slab walkway as a boardwalk for positioning of the cages. Six inch by six inch timber posts would be driven to the hardrock layer for a minimum of ten feet to anchor the Platform. The engineer testified that this alternative would be cost effective if used in lieu of the cable road. Respondent's Environmental Specialist testified that such a modification to concentrate the project on the east end of the island would be recommended because it would eliminate the cable road and its adverse environmental consequences Rodriguez Key is almost completely vegetated by mangroves with a red mangrove fringe around the perimeter and black mangroves on the higher interior areas. Some of the red mangroves are 100 to 150 feet in height and the black mangroves range from 20 to 40 feet high. In the east center of the island is an open area of batis, and red mangroves are located in the center and west end of the island. White mangroves are also present in the south side of the island. Throughout the island, there are watermarks on trunks and prop roots ranging from four inches to six inches, and an abundant growth of brown algae. Such algae requires regular submergence to exist. No significant forms of wildlife are present on the island. Batis is a submerged species which is important for sediment stabilization. In order to clear the 20-foot wide trails with cable suspensions as low as 36 inches above ground, it will be necessary to prune or cut back a large number of mangroves to that height. However, the prop roots of the red mangroves extend above six feet in some areas. If the trees and roots are cut to a three-foot height, it is unlikely that they would survive. Red mangroves produce leaf detritus which forms a part of the food chain for marine life. Such trees are island stabilizers which provide filtration and uptake of nutrients associated with runoff and intertidal waters. The waters surrounding the island are categorized as Class III waters under State regulations. The presence of brown algae on prop roots is evidence that the island is regularly inundated to some degree. Turtle grass, which is an indicator of regular tidal flushing, is in abundance on the flats waterward of the island but not found in the interior. During a visit to the Rodriguez Key in 1981, DER personnel observed standing water across the entire island to a depth of from one inch to one foot at high tide. (Testimony of Carroll, Key, Helbling, Exhibits 6, 8) Thirteen public witnesses testified at the hearing, including residents, landowners, and representatives of housing developments in the Key Largo area. They were uniformly opposed to the proposed project for a variety of reasons. Primarily, they fear that the presence of primates on the island a short distance away from Key Largo will produce excessive noise, odor, and water pollution in the adjacent waters which are used for recreation. Additionally, some are of the opinion that their property values will decrease as a result of the activity. A District Naturalist employed by the Department of Natural Resources at the nearby Coral Reef State Park testified that her agency opposes the proposed activity due to concern that it will cause degradation of water quality in the surrounding waters and that increased boat traffic could damage the shallow coral reef beds which lie near the State park. There is also general apprehension among the nearby residents that a hurricane could destroy any facilities on Rodriguez Key and cause damage to their property. A petition signed by a large number of Key Largo residents reflects their opposition to Petitioner's use of Rodriguez Key as a primate breeding and research facility. (Testimony of public witnesses (Hearing Officer's Exhibit 2) Exhibits 9-10) There probably would be no odor problem connected with the presence of monkeys on Rodriguez Key if the cages are regularly cleaned and fecal waste is disposed of according to sanitary methods. Although primates are inclined to vocalize at feeding time or when strangers appear, they do not screech at great length and the presence of trees and other foliage would modify the sound. (Testimony of Darrow)

Recommendation That the application of Petitioner Melvin J. Laney, as modified in the above Conclusions of Law, be approved and that a permit authorizing the requested activities be issued pursuant to Chapter 403, F.S., together with water quality certification under PL-500, subject to standard conditions reasonably necessary for prevention of pollution. DONE and ENTERED this 14th day of September, 1981, in Tallahassee, Florida. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of September, 1981. COPIES FURNISHED: Ross A. McVoy, Esquire Madigan, Parker, Gatlin, Swedmark and Skelding Post Office Box 669 Tallahassee, Florida 32302 Ray Allen, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Honorable Victoria Tschinkel Secretary, Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 =================================================================

Florida Laws (1) 403.087
# 4
FOSTER F. BURGESS vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-002900 (1993)
Division of Administrative Hearings, Florida Filed:Freeport, Florida May 26, 1993 Number: 93-002900 Latest Update: Oct. 13, 1993

Findings Of Fact By application filed November 17, 1992, Petitioner seeks a dredge and fill permit for the construction of a private boat dock; a 24 foot by 26 foot platform for an "A" frame camping shelter; and a 4 foot by 18 foot boardwalk, all in jurisdictional wetlands along the water's edge of a small natural basin off of the Choctawhatchee River at Section 24, Township 2 South, Range 19 West in Walton County, Florida. The Choctawhatchee River has been designated an Outstanding Florida Water by Rule 17-302.700, Florida Administrative Code. The proposed project is located in Class III waters and is adjacent to Class II shellfish approved waters. The proposed project is not exempt from Respondent's permitting jurisdiction. Petitioner proposes to use the elevated "A" frame structure for recreational purposes for his family and friends. He owns 150 acres of land in the vicinity. He provided no reliable assurances that he, or the owners of 350 acres of adjacent property, would not subdivide and sell plots of the property in the future for construction of similar recreational facilities in these jurisdictional wetlands. There is no feasible land access to Petitioner's proposed project site. Petitioner proposes to use "port-a-potty" chemical equipment with a capacity of 5.5 gallons for the containment of human waste, hauling the waste, chemicals and equipment out on boats as necessary. Potable water will also be carried to the site via boat by the six to eight individuals contemplated to use the proposed project facility on an estimated 15-20 weekends per year. Petitioner's proposed portable toilet is not an acceptable method of sewage disposal for the number of individuals using the proposed facility. Reasonable assurances were not provided by Petitioner that transfer of such waste by boat will not, through accident or otherwise, be introduced into the river and degrade water quality. Petitioner was unable to provide reasonable assurances that the proposed permanent facilities would not attract and be used by other individuals, leaving garbage and waste behind. Petitioner's offer to place a "no trespassing" sign on the property is not an adequate substitute to monitoring of the property to prevent improper use by others. In the event of a severe storm, Petitioner's proposed structure would be subject to destruction and its constituent parts strewn on other land or into the water. The proposed construction would adversely affect the public health, safety, welfare and property of others. The proposed project will adversely impact the conservation of fish, wildlife and their habitats. The proposed site area supports many endangered and threatened species, including the Atlantic Sturgeon and the bald eagle, which would be adversely affected by the project. Also adversely affected by the dwelling construction and subsequent loss of habitat would be rookeries of wading birds such as the Little Blue Heron and the Egret, both of which nest in these wetlands. While fishing for Petitioner and his family or guests at the proposed project would possibly be improved, Petitioner offered no credible evidence that fishing, recreational values or marine productivity in the area would not be affected. The wetlands where Petitioner proposes to build his shelter serve as a nursery area for shrimp and oysters. Destruction or degradation of waters of the wetland will have an adverse effect on any shellfish or marine life inhabiting the area. The permanent nature of the proposed project will result in a permanent impact on the wetlands in the vicinity of the project. Petitioner offered no evidence that the current condition and relative value of functions being performed by areas subjected to the proposed project will not be affected. The area where the project is proposed is a highly productive estuary which interfaces with the Choctawhatchee River and Choctawhatchee Bay. This ecosystem provides habitat for various unique species of plants and wildlife and is the location of shrimp and oyster nurseries. Further, the estuary serves to clean the water, remove sediment, revitalize the water with oxygen, and convert nutrients such as nitrogen and phosphorus into plant material and ultimately into usable organic nutrients. The proposed project will lower existing ambient water within an Outstanding Florida Water. The increased docking of boats in shallow wetland waters could cause violations of water turbidity standards, resulting in decreased diversity of the Shannon-Weaver Index of Benthic Macroinvertebrates. Water quality violations would also result from increased oil sheen on the surface of the water. Secondary impacts of the proposed project include the loss of wetland habitat, impairment of wetland function, and violation of water quality standards due to increased boat traffic and the possibility of sewage contaminating the wetlands and surrounding environs. The proposed project fails to meet Respondent's requirements for issuance of a dredge and fill permit in view of the lack of reasonable assurances by Petitioner that prohibited cumulative impacts will not result; that Class II waters will not be degraded; that the project is clearly in the public interest; that ambient water quality standards will not be violated and that detrimental secondary impacts will not occur. Denial of the permit is consistent with other, similar permitting decisions by Respondent.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that a Final Order be entered denying the application for issuance of Permit No. DF66-222039-1 to Petitioner. DONE AND ENTERED this 31st day of August, 1993, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of August, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-2900 The following constitutes my rulings, pursuant to Section 120.59, Florida Statutes, on proposed findings of fact submitted by the parties. Petitioner's Proposed findings None submitted. Respondent's Proposed findings 1.-3. Accepted in substance, not verbatim. 4.-7. Rejected, subordinate to HO findings. Accepted. Rejected, legal conclusion. 10.-11. Accepted. Rejected, unnecessary. Accepted. Rejected, unnecessary. 15.-22. Accepted in substance. COPIES FURNISHED: Virginia B. Wetherell Secretary Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Foster F. Burgess, Route 1 Box 97-C4 Freeport, Florida 32439 Donna M. LaPlante Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 5
JAMES E. PEAKE AND ALICIA M. PEAKE vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002409 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002409 Latest Update: Jul. 25, 2005

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242
# 6
MICHAEL C. BROWN vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT AND CENTEX HOMES, 04-000476 (2004)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 04, 2004 Number: 04-000476 Latest Update: Sep. 13, 2004

The Issue The issues are whether Respondent Centex Homes is entitled to the issuance of an environmental resource permit to construct a 2665 square-foot boat dock and authorization of a lease of 7807 square feet of sovereign submerged land in the portion of the Intracoastal Waterway known as Lake Worth Lagoon in Palm Beach County.

Findings Of Fact In this case, Respondent South Florida Water Management District (District) has proposed to issue to Respondent Centex Homes (Centex) an environmental resource permit (ERP) and authorization to lease sovereign submerged land. The purpose of the ERP and lease authorization is for Centex to construct a dock to serve a multifamily development known as Ocean Cay. Ocean Cay is a 56-unit townhouse development located on a five-acre parcel in Hypoluxo, Florida, bordered on the west by U.S. Highway 1, on the east by the Lake Worth Lagoon, and on the north and south by developed residential areas. At the time of the hearing, Centex had closed on the sale of 50 of the residential units, was finishing construction of the final six units, and had entered into contracts to sell three of these six units. The Lake Worth Lagoon is a Class III water and is not an aquatic preserve. The Intracoastal Waterway channel is in the middle of the lagoon. The proposed dock would be about 1.5 miles north of the South Lake Worth Inlet (a/k/a Boynton Inlet) and 13 miles south of the Lake Worth Inlet (a/k/a Palm Beach Inlet). As measured from the project location to the opposite shoreline, the length of the dock is more than 25 percent of the width of the waterbody. Petitioner Michael C. Brown resides at 131 Las Brisas Circle, Hypoluxo, Florida. Intervenor O'Brien resides at 124 Park Lane East, Hypoluxo, Florida. Intervenors Evlyn and Vern Hakes reside at 140 Park Lane East, Hypoluxo, Florida. As stipulated by Respondents, Petitioner and Intervenors have standing, so this Recommended Order will not restate the substantial evidence in the record of the standing of Petitioner and Intervenors. Three of the objections raised by Petitioner and Intervenors involve procedural issues that are easily dismissed on factual grounds. The first objection is that Centex lacks the requisite equitable interest in the upland to obtain a lease of sovereign submerged land. The second objection is that the Ocean Cay Homeowners' Association lacks the financial, legal, and administrative resources to ensure the performance of all permitting obligations, as they may arise in the future. The third objection is that District staff, not the Governing Board of District, issued the proposed agency action on the ERP. As for the first procedural objection, Centex acquired the parcel by special warranty deed, which vests fee simple interest in Centex and contains all the customary warranties of title. The title insurance policy obtained by Centex for the parcel insures fee simple interest in Centex, subject to undescribed reservations contained in the deed from the Board Trustees of the Internal Improvement Trust Fund (Trustees), any part of the parcel lying below the mean high water line, and public rights "to use the waters over the submerged land lying adjacent to or within the Intercoastal [sic] Waterway for boating, fishing, swimming and other public purposes, together with the rights of the State of Florida and United States to regulate the use of the navigable waters." Not only does Centex enjoy full beneficial ownership of the upland, subject to the rights of its grantees who have purchased townhouse units, but Centex's title extends approximately 250 feet waterward of the mean high water line by operation of a deed from the Trustees to a predecessor in interest of Centex. If the ownership of submerged land between the submerged land for which an applicant seeks a lease and adjacent uplands also owned by an applicant has any effect at all, it only emphasizes the legitimate, nonspeculative interest of such an applicant in obtaining the sought-after lease. As for the second procedural objection, Centex is a sophisticated land-development entity with ample financial, legal, and administrative resources to ensure the satisfaction of any permitting obligations imposed upon it in connection with this case. At present, Centex controls the Ocean Cay Homeowners' Association. So, at present, the concerns of Petitioner and Intervenors about the ability of the homeowners' association to satisfy its obligations are unfounded. It is true that, upon the closing of the sale of sufficient units, Centex will transfer control of the homeowners' association to the homeowners. The record does not describe the financial, legal, and administrative resources of the homeowners' association following the withdrawal of Centex, but they will presumably not approach the substantial resources of Centex. District claims that Centex may not transfer the ERP without District's approval; however, ERP Special Condition 2 identifies the operating entity responsible for the docking facility as Ocean Cay Homeowners' Association, even though the ERP identifies the applicant as Centex. Fatal to the argument of Petitioner and Intervenors, though, are the facts that the proposed lease of sovereign submerged land is for only five years, a failure to discharge permit obligations that should be incorporated verbatim into the lease militates against any lease renewals, and the removal of the dock would substantially cure any deficiencies in its maintenance. As for the third procedural objection, District staff, on November 21, 2003, proposed to issue a standard general ERP for the construction and operation of a 2665 square-foot docking facility with nine boat slips for use by the residents of Ocean Cay and to approve the lease of 7807 square feet of sovereign submerged land under and surrounding the docking facility. Staff issues a proposed standard general ERP when a permit does not conflict with existing law or policy or a work of the District. District's Governing Board issues a proposed standard individual ERP in the relatively rare case in which a permit conflicts with existing law or policy or a work of the District. Again, the objections of Petitioner and Intervenors lack factual support. Here, the Governing Board, not staff, will receive the Recommended Order and issue the Final Order. So, as Petitioner and Intervenors wish, the Governing Board, not staff, will take the final agency action in this case. Under these circumstances, the record reveals no harm in the fact that District staff issued the proposed agency action. The remainder of the ERP provisions bears on the substantive objections raised by Petitioner and Intervenors. As amended at the final hearing by District and accepted by Centex, ERP Special Condition 9 provides: A permanent sign shall be installed at the docking facility entrance to notify boat owners that mooring at the docking facility shall be limited to no more than a total of nine vessels. Vessels moored in slips 1-2 and 7-9 shall be limited to outboard powered vessels, not more than 27 feet in length as reported by the manufacturer exclusive of engines and any bow pulpit. Vessels moored in slips 3 and 6 shall be limited to not more than 27 feet in length as reported by the manufacturer exclusive of engines and any bow pulpit. Vessels moored in slips 3 and 6 are not limited to outboard power. Vessels moored in slips 4 and 5 shall be limited to 36 feet in length, as reported by the manufacturer exclusive of engines and any bow pulpit. Vessels in slips 4 and 5 are not limited to outboard power. Slips are identified by number in the discussion below. As amended at the final hearing by District and accepted by Centex, ERP Special Condition 10 provides: "Dock, walkway, and seagrass sign pilings shall be constructed of plastic, concrete or greenheart, non-CCA treated wood or wood wrapped in 30 to 60 mil pvc." ERP Special Condition 11 provides that construction of the dock shall be in accordance with the locations and dimensions shown on the enclosed exhibits. The referenced drawings depict the adjacent upland, submerged bottom, and proposed dock. The drawings describe sufficient detail of the adjacent upland. The north and south property lines of the 190- foot wide parcel run due east and west. At mean high water, the parcel's shoreline runs about 210 feet in a south-southwesterly direction from the north property line. Waterward of the mean high water line is a thin band of sand, varying portions of which are exposed between mean high water and mean low water. The drawings describe the submerged bottom in great detail as to seagrass and reasonable detail as to water depths. Waterward of the beach is a band of Halodule wrightii (shoal grass). The drawings describe the shoal grass in this area as "sparse." The drawings depict mean low water depths along three transects at 25-foot intervals, starting roughly at the landward commencement of the shoal grass. (All water depths are based on mean low water.) If the property lines were extended into the water, the north transect is 25 feet south of the north property line, and the south transect is 25 feet north of the south property line. The middle transect is an equal distance between the north and south transects. Along the north transect, the band of shoal grass is about 25 feet wide. Along the south transect, the band narrows to about six feet wide. Along the middle transect, the band is about 50 feet wide. Waterward of the band of sparse shoal grass, according to the drawings, is a band of "mixed Halodule and sparse Johnson's." The reference to "Johnson's" is to Halophila johnsonii (Johnson's grass), which is a rare species of seagrass that is listed by the U.S. Environmental Protection Agency as threatened. 50 C.F.R. § 17.12(h). Johnson's grass is found only on the east coast of Florida from the Indian River Lagoon to Biscayne Bay and is a fragile species of seagrass. The band of mixed shoal grass and sparse Johnson's grass reflects the same pattern as the shoal grass closer to shore: thinner at the north and south ends and wider in the middle. Along the north transect, the band of the two species is about 162 feet wide. Along the south transect, the band is about 212 feet wide. Along the middle transect, the band is about 240 feet wide. Waterward of the middle band of mixed shoal grass and sparse Johnson's grass, according to the drawings, is "scattered isolated blades of H. Decipiens and [Johnson's grass]." "H. Decipiens" is Halophila decipiens (paddle grass). Waterward of the north and south ends of the mixed shoal grass and sparse Johnson's grass are triangular-shaped areas of "sparse Johnson's." Along the north transect, this band of sparse Johnson's grass is about 75 feet wide. Along the south transect, this band of sparse Johnson's grass is about 50 feet wide. Waterward of these bands of sparse Johnson's grass is "scattered, isolated blades of H. Decipiens and [Johnson's grass]." Measured from the mean high water line, the band of mixed shoal grass and sparse Johnson's grass extends about 275 feet along the north transect, 312 feet along the middle transect, and 300 feet along the south transect. Water depths are shallow throughout almost the entire project area. Starting from shore, water depths are almost entirely less than 1.0 feet within the area of sparse shoal grass, although depths reach 1.2 feet along the middle transect. Proceeding waterward along the north transect, the depths within the area of mixed shoal grass and sparse Johnson's grass range from 0.7 feet at the landward end to 2.2 feet at the waterward end. Proceeding waterward along the middle transect, the depths within the area of mixed shoal grass and sparse Johnson's grass range from 1.2 feet to 4.2 feet. Proceeding waterward along the south transect, the depths within the area of mixed shoal grass and sparse Johnson's grass range from 1.0 feet to 2.7 feet. The water continues to deepen in the triangular-shaped areas of sparse Johnson's grass, through which the north and south transects run. Along the north transect, the water depths range from 2.2 feet to 3.1 feet. Along the south transect, the water depths range from 2.7 feet to 3.6 feet. The drawings depict depths waterward of the start of scattered, isolated blades of paddle grass and Johnson's grass. These reported depths extend to a point roughly parallel to the end of the proposed dock along the north transect, about 12 feet waterward of the end of the proposed dock along the middle transect, and about 37 feet waterward of the end of the proposed dock along the south transect. Along the north transect, the depths remain constant, at about 3.5 feet, until the most waterward 25 feet, along which the water deepens 0.5 feet to 4.1 feet. Along the middle transect, the depths deepen about 0.5 feet to around 5.0 feet for about 75 feet, then deepen to 5.4 feet a few feet landward of the most waterward portion of the dock. About 10 feet waterward of the end of the dock, the depth reaches 5.7 feet, which is the deepest reported depth in the project area. Along the south transect, the depths deepen about one foot over the first 100 feet waterward from the start of the scattered, isolated blades of paddle grass and Johnson's grass. From a point parallel to the end of the dock, the water along the south transect deepens another 0.5 feet to about 5.2 feet. The drawings also describe the proposed dock in great detail. The dock, oriented due east and west, runs a distance of 420 feet from its landing, at the mean high water line, to its waterward terminus. The dock is four feet wide, except for a 10-foot long section, at about midpoint, that is six feet wide to facilitate wheelchair access. At the urging of District, to reduce seagrass impacts, Centex moved the dock ten feet south and extended it ten additional feet into deeper water. Because of the former of these modifications, the dock runs ten feet south of the middle transect. The main deck of the dock is grated, so as to allow at least 46 percent of the light to pass through it, from the waterward extent of the sparse shoal grass to the waterward extent of the mixed shoal grass and sparse Johnson's grass, which is a distance of about 250 feet. Although the drawings specify only a value of 46 percent light transmissibility, testimony established that this criterion would require the use of fiberglass decking material. Perhaps the most prominent feature of the dock, in addition to its length, is its height. The deck is five feet above mean high water. Mean high water is 1.7 feet National Geodetic Vertical Datum (NGVD). Mean low water is -0.8 feet NGVD. Five decks run perpendicular to the main deck--three on the south side and two on the north side--to form the slips at the waterward terminus of the dock. The most landward of these decks is four feet wide and 30-feet long and runs south of the main deck, at a point about 330 feet waterward of the landing. Two more decks, both of the same dimensions as the first deck, join the main deck at a point about 375 feet waterward of the landing. Thirty-eight feet separate the two southern decks, so that the two slips created between them (Slips 9 and 8, from landward to waterward) each is 18-19 feet wide. The most landward slip formed north of the main deck (Slip 1) is also 18-19 feet wide. Two pilings north of the main deck and two pilings south of the main deck define these first three slips. The remaining perpendicular decks form the terminus of the entire dock. These decks are eight-feet wide and run 38 feet north and 38 feet south of the edges of the main deck. The four slips immediately landward of these decks are 18-19 feet wide. Moving clockwise from the northwest corner, these slips are Slips 2, 3, 6, and 7. The remaining two slips are waterward of the eight-foot wide deck. The northern slip is Slip 4, and the southern slip is Slip 5. According to the drawings, the waterward extent of the proposed lease is 18 feet waterward of the waterward end of the dock. The waterward extent of the proposed lease is 425 feet from the landward end of the Intracoastal Waterway channel (the 415 feet shown in the drawings is wrong), which, as established by testimony, is 125 feet wide at this location. The drawings also depict a 42-inch high handrail running from the landing to the most landward perpendicular deck. The purpose of the handrail, whose vertical slats are eight inches apart, is to discourage mooring of vessels to the main dock landward of the slips. Every 50 feet, at the base of the handrails on either side of the dock, is a sign prohibiting docking, mooring, loading, or unloading of vessels. At the terminus of the dock, the drawings show a rock crib structure that rises about one foot from the submerged bottom along the entire 80-foot length of the eight-foot wide perpendicular deck. Apparently, the rock crib is eight-feet wide, so that it extends, beneath the surface of the water, under the entire area of the eight-foot wide perpendicular deck. Extending above the rock crib, along this 80-foot long deck, is a wave attenuator. The drawings also depict a couple of seagrass warning signs north and south of the dock, about 20-30 feet waterward of the waterward extent of the sparse Johnson's grass, at the north and south portions of the project area, and the mixed shoal grass and sparse Johnson's grass, in the middle of the project area, just a few feet north of the dock. The drawings also show pilings at a minimum of 10-foot intervals along the entire length of the main deck, as well as pilings for the perpendicular decks at the dock's terminus. Special Condition 12 prohibits fueling facilities or hull-painting or -cleaning at the dock. Special Condition 13 prohibits liveaboards. Special Condition prohibits subleasing of the docking facilities and limits their use to residents of Ocean Cay. Special Conditions 14 and 15 detail various manatee- protection provisions. Special Condition 19 requires the implementation of a turbidity-control plan during construction. Special Condition 18 prohibits construction under the ERP until the Department of Environmental Protection has issued a submerged land lease. As amended at the final hearing by District and accepted by Centex, Special Condition 20 requires Centex to maintain at least one trash receptacle at the terminus of the dock. The District staff report states that Centex has minimized the impacts of the project by reducing the length of the dock from 550 feet and its capacity from 22 slips. The staff report notes, as mentioned above, the relocation of the dock ten feet to the south and ten feet waterward, both changes to reduce impacts on seagrasses. The District staff report states that manatees probably use the area of the project for travel and foraging nearshore seagrass beds. Concerning the lease of sovereign submerged land, the District staff report acknowledges the waterward extent of Centex's ownership of submerged lands. As for the sovereign submerged land, the District staff report states, without explanation, that the docking facility is not more than 25 percent of the width of the "navigable portion of the waterbody," pursuant to Florida Administrative Code Rule 18-21.004(4)(a)3, and is more than 100 feet from the federal navigation channel, as required by Florida Administrative Code Rule 18-21.004(4)(a)4. The District staff report attaches "Recommended Special Lease Conditions for Ocean Cay." These include a restriction that vessels moored at the dock clear the submerged bottom by at least one foot at all times while moored. Other provisions correspond to the special conditions attaching to the ERP, as described above. As discussed in the Conclusions of Law, analysis of the proposed activity requires three determinations: first, does the proposed activity, unmitigated, adversely impact surface waters; second, if so, has Centex reduced or eliminated all such impacts through design modifications to the extent practicable; and third, if so, but if net impacts remain, has Centex adequately mitigated these net impacts? Absent mitigation, the construction of a 420-foot dock covering 2665 square-feet of water adversely impacts the water resources, most obviously by the immediate destruction of the seagrasses occupying the area in which at least 80 pilings will be installed and by the gradual destruction of the seagrasses that will be shaded by the dock and lose the light necessary for survival. Centex has incorporated into the proposed dock design all practicable modifications that could eliminate or reduce these adverse impacts to the surface waters. Centex has proposed a dock that is narrow, high, translucent, and nontoxic. To minimize the risk of prop dredging of the seagrass and bottom sediments, the dock's length and railings would limit mooring to relatively deeper water, and the boat-length restriction would effectively limit the reach of prop dredging. Even after these design modifications, however, adverse impacts to the surface waters remain that Centex must mitigate. The ultimate issue, then, is whether Centex has adequately mitigated the remaining impacts of the proposed activity by proposing sufficient affirmative acts to offset the remaining adverse impacts. Strictly speaking, mitigation consists of activities that are unnecessary for the desired activity--here, the construction of a dock--but are performed to offset the adverse impacts of the desired activity. In this case, Centex proposes three mitigation activities: the construction of a rock crib, the installation of a wave attenuator, and the erection of two seagrass warning signs. The adequacy of this proposed mitigation requires identification of the specific impacts to the surface waters and the efficacy of the mitigation in offsetting these impacts. As cited in the Conclusions of Law, the public-interest criteria set forth the elements requiring consideration. Except to the extent discussed in navigation, the dock will not adversely affect the public health, safety, or welfare or property of others. The narrow, long dock, which restricts mooring activity to its terminus over 400 feet from the shoreline, has no impact on the riparian rights of adjacent or nearby upland owners. Thus, no mitigation is necessary for this criterion. Even after mitigation, the dock will adversely affect the conservation of fish and wildlife, including listed species, and their habitats. The most immediate impact of the dock is upon the seagrasses that presently grow on the bottom. Seagrasses, which are among the most productive communities known to nature, are vital to the health of the Lake Worth Lagoon. Seagrasses perform numerous functions important to the surface waters and, specifically, the conservation of fish and wildlife and their habitats: shelter for small fish and shellfish; food for a variety of small and larger organisms, including manatee and sea turtles; stabilization of bottom sediments, which improves water clarity; recycling of nutrients, including nitrogen--an important function for the water quality of the nitrogen-limited Lake Worth Lagoon; and formation of a substrate on which epiphytes may attach and provide food for a variety of organisms, including manatee and sea turtles. The mitigation activities offset some, but not all, of the functions provided by the seagrass that are lost by the construction of the dock. The rock crib probably will replace the function of the seagrass in stabilizing sediments. The rock crib probably will replicate some of the shelter function of the seagrass, although nothing in the record would support a finding that the crevices of the rock crib provide exactly the same shelter as the seagrass patches that will be destroyed by the dock. Thus, there is no basis to assume that the shelter functions of the seagrass are replaced by the shelter functions of the rock crib. Undoubtedly, the rock crib will not replace the food function of the seagrass. Some predators may find the same juvenile fish in the rock crib as they have found in the seagrass, and some organisms may find the same epiphytes attaching to the rock crib as they have found attaching to the seagrass. However, the organisms, such as manatee and sea turtles, that eat the seagrass itself will find the rock crib a poor food substitute. Additionally, the rock crib will perform none of the nutrient-fixing that seagrasses perform. The rock crib thus fails to perform the vital functions of seagrass in providing food for important species, such as the manatee, and fixing nutrients, which is important to improving or maintaining water quality. The wave attenuator is a potentially useful form of mitigation. Although a slight over-generalization, the seagrass thins to the point of near disappearance at a point in which the slope of the submerged bottom breaks--very roughly at about three feet deep. Centex's witnesses offered the better explanation of this phenomenon by linking it to the strong wakes produced by vessels motoring in the Intracoastal Waterway. Although the area of the proposed project is permanently slow speed, no wake, the Intracoastal Waterway channel has no speed limit, and the wakes from vessels in the channel pound the shallows, focusing considerable energy upon the rising bottom at the point at which the water depth reduces to three feet. The main problem with the wave attenuator as mitigation is one of scale. Nothing in the record suggests that the attenuator, even in conjunction with the rock crib beneath it, will attenuate the incoming waves along the entire length of the dock. The attenuator will absorb the energy of the waves, whether from passing vessels or storms, but the interrupted waves will rejoin a short distance landward of the attenuator, possibly waterward of the first appearance of significant seagrass. The wave attenuator is thus inadequate in preserving or enhancing the remaining seagrass following the construction of the dock. The signs suffer two shortcomings. First, they are as likely to attract fishers as they are to deter recreational boaters, so the record permits no finding as to their efficacy in preserving or enhancing the remaining seagrass following the construction of the dock. Second, the record discloses little prop dredging of the seagrasses in the proposed vicinity of the dock, so the effect of the signs is not to ameliorate the damage historically done in this area by boats. To the contrary, at best, the signs may reduce some of the prop dredging that would occur in the future by boats drawn close to shore by the presence of the dock, which will attract fish and, thus, fishers. For these reasons, the signs are inadequate mitigation. Considered in conjunction with each other, the three mitigation activities fail to address the important food and nutrient-fixing functions of the seagrass that would be destroyed by the dock. Ignoring the failure of the proposed mitigation to address two of the most important functions of the seagrass, District and Centex contend that the mitigation is adequate for other reasons. District and Centex contend that the loss of seagrass is de minimis, consisting of not more than .03 acres of destroyed seagrass, or about 2.2 percent of the seagrass in the project area. Although the east-west orientation of the dock results in more shading than an identical dock oriented north- south, the shading loss could be less due to commendable design modifications involving the width, height, and translucent materials of the dock. Adding to the loss of seagrass from shading is the loss from the "halo effect," which is the wider area of seagrass loss probably resulting from the effect of the dock in artificially attracting and retaining seagrass consumers, like parrot fish. The record thus affords no basis for a finding of a loss of less than .03 acres. Nor does the record afford any basis for determining that the seagrass loss is de minimis. If Lake Worth Lagoon has seagrass to spare, the record does not support such a finding. If the lost functions of the seagrass--primarily, providing food and fixing nutrients--are not de minimis, the question remains whether practicable mitigation for these functions exists. Although transplantation of seagrass may be impracticable due to poor water clarity, even one of Centex's experts noted the importance of filling holes for seagrass recruitment, given the inability of seagrass to extend roots laterally up or down slopes. District's expert identified backfilling submerged holes and scraping spoil islands as two means of encouraging natural seagrass recruitment. District's expert noted a practical consideration favoring rock cribs versus more elaborate, higher-maintenance mitigation. Rock cribs are low- or no-maintenance projects that require no monitoring, enforcement, or enhancement. However, these same considerations underscore the complexity of the functions provided by seagrass lost to the proposed activity. Mitigating the loss of these functions may be difficult and high-maintenance, if the mitigation is to offset the loss. On this record, a finding of impracticability of such mitigation activities would be speculative, given the absence of evidence of impracticability, such as in the form of the absence of nearby depressions with suitable recruitment conditions or seagrass restoration projects in which Centex could participate. An unusual factor militating against a finding of adequate mitigation is that one of the seagrasses is itself a protected species. Johnson's grass is rare and fragile. The dock would displace Johnson's grass in a location less than one mile north of one of ten federally designated Critical Habitats for Johnson's Seagrass and one of two such habitats in Lake Worth Lagoon. 50 C.F.R. § 226.213(h). In contrast to the permit conditions directly protecting the manatee, the record is silent as to any effort by District to coordinate this permit with the work of the federal government and possibly the state and local governments to preserve Lake Worth Lagoon's seagrass, including the threatened Johnson's grass. On balance, even after mitigation, the dock will adversely affect the conservation of fish and wildlife, including listed species, and their habitats. The dock will not adversely affect navigation, the flow of water, and erosion or shoaling. Located only 1.5 miles from the inlet, tidal flows are good in the project area. The rock crib and wave attenuator, which tend to restrict east-west flows and waves, will have little impact on the tidal flows, which are predominantly in a north-south direction. The dock will not cause any erosion or shoaling. The dock will be lighted and should not present a navigation hazard. Larger vessels will remain a safe distance from the dock as they travel in the Intracoastal Waterway channel. Under normal boating conditions, small boats, such as kayaks, canoes, and small motorboats, can safety navigate under the five-foot deck and between the pilings spaced at a minimum distance of ten feet apart. The dock will not adversely affect the fishing or recreational values in the vicinity. To the contrary, the structure provided by the dock will probably attract and concentrate fish, making them easier to catch. In the longer term, even after mitigation, the dock will adversely affect marine productivity for the reasons discussed in connection with the conservation of fish and wildlife and their habitat. The dock will not adversely affect any historical or archaeological resources. Even after mitigation, the dock will adversely affect the current conditions and relative value of functions for the reasons discussed in connection with the conservation of fish and wildlife and their habitat. For the reasons set forth above, Centex has failed to provide reasonable assurance that the proposed activity, even after mitigation, is not harmful to the District's water resources, is not inconsistent with District's overall objectives, is not contrary to the public interest, will not adversely impact the value of functions provided to fish and wildlife and listed species by surface waters, and will not cause adverse secondary impacts to the water resources

Recommendation It is RECOMMENDED that the South Florida Water Management District enter a final order denying Centex Homes' request for an environmental resource permit and approval to lease sovereign submerged lands for the purpose of constructing the above- described dock at Ocean Cay in the Lake Worth Lagoon. DONE AND ENTERED this 2nd day of August, 2004, in Tallahassee, Leon County, Florida. S ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of August, 2004. COPIES FURNISHED: Henry Dean, Executive Director South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida Marcy I. LaHart 33416-4680 Marcy I. LaHart, P.A. 711 Talladega Street West Palm Beach, Florida 33405 Ashley D. Foster South Florida Water Management District 3301 Gun Club Road Mail Stop Code 1410 West Palm Beach, Florida 33406 J. Kendrick Tucker Huey, Guilday, Tucker, Schwartz & Williams, P.A. Post Office Box 12500 Tallahassee, Florida 32317-2500

CFR (1) 50 CFR 17.12(h) Florida Laws (18) 120.569120.5717.12253.01253.02253.03267.061373.042373.086373.413373.4136373.414373.416373.421373.427373.43040.011403.031
# 7
PHILLIP LOTT vs CITY OF DELTONA AND ST. JOHNS WATER MANAGEMENT DISTRICT, 05-003662 (2005)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Oct. 06, 2005 Number: 05-003662 Latest Update: Jun. 26, 2006

The Issue This case involves a challenge to St. Johns River Water Management District’s (District or SJRWMD) intended issuance of an Environmental Resource Permit (ERP) granting the City's Application No. 4-127-97380-1, for the construction and operation of a surface water management system for a retrofit flood-relief project known as Drysdale Drive/Chapel Drive Drainage Improvements consisting of: excavation of the Drysdale Drive pond (Pond 1); improvement to the outfall at Sterling Lake; and the interconnection of Pond 1 and four existing drainage retention areas through a combination of pump stations and gravity outfalls (project or system). The issue is whether the applicant, the City of Deltona (City or Deltona), has provided reasonable assurance the system complies with the water quantity, environmental, and water quality criteria of the District’s ERP regulations set forth in Chapter 40C-4, Florida Administrative Code,1 and the Applicant’s Handbook: Management and Storage of Surface Waters (2005) (A.H.).2

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order issuing to the City of Deltona an ERP granting the City's Application No. 4-127-97380-1, subject to the conditions set forth in the Technical Staff Report. DONE AND ENTERED this 17th day of March, 2006, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of March, 2006.

Florida Laws (2) 120.57373.4136
# 8
GILBERT LEE SWARTZ AND MRS. GILBERT LEE SWARTZ vs. SEMINOLE COUNTY BOARD OF COUNTY COMMISSIONERS, ET AL., 80-000042 (1980)
Division of Administrative Hearings, Florida Number: 80-000042 Latest Update: Jun. 09, 1980

Findings Of Fact The County applied on August 24, 1979, for a permit to construct a swimming beach on the southwest shore of Sylvan Lake in the northwest part of Seminole County, Florida. On December 4, 1979, the Department gave notice of its intent to grant the permit. As proposed, the beach would be 150 feet in length along the shoreline and be approximately 65 feet deep, 40 feet on the land side of the waterline and 25 feet on the lake side of the shore waterline. Three dock structures are also proposed. The first is a boat dock to be 6 feet wide, which will extend into the lake for 25 feet with a 15 foot "L" at its end. In addition, a 6 foot wide, 20 foot long fishing pier is proposed with a 6 by 20 foot "T" on its end. Finally, the County proposes constructing a 6 foot wide 15 foot long aquatic study platform that would terminate in a 6 by 30 foot "T". The County plans to remove vegetation from an area of 150 feet long by 25 feet. As agreed at the hearing, this removal would be by hand only.. No machinery would be used. The site of the project is owned by the County. As part of its application, the County agrees to leave undisturbed 2,630 feet of the remaining shoreline it owns. At the present time approximately 20 percent of the lake's total shoreline is occupied by developed residential property. Many of the homeowners have removed the vegetation from their shorelines. The County's agreement not to alter 90 percent of its shoreline would therefore be beneficial to preserving the natural state of the lake. Sylvan Lake is an oligotropic spring-fed lake of 160 acres. Its well vegetated shoreline alternates between large grassy marshes and well-defined uplands. The lake bottom in the project site is firm sand with little potential for causing a turbidity problem. The lake has excellent water quality. It is a valuable habitat for fish and aquatic dependent birds and mammals. The vegetation along the shoreline of the project site consist of sawgrass, pickerelweed, and some arrowhead on the land side with spatterdock and mats of floating maidencane on the water side. In a freshwater closed system such as this lake the rooted emergent plants are vital to maintaining the quality of the water. The plants stabilize nutrients, expert oxygen and keep the water cool. The removal of this vegetation from a 150 foot strip will have an adverse but insignificant impact on the biological resources and the water quality of the lake. The construction of the fishing pier, boat dock, and observation platform will have no lasting environmental impact and the limited turbidity which may be generated during their construction can be well contained by the use of turbidity curtains. The swimming beach is a part of the County's plan for a diverse recreational park to provide the public with facilities for nature trails, baseball, picnicking, etc. The water classification of Sylvan Lake is Class III. CONCLUSIONS OF LAW The Division of Administrative Hearings has jurisdiction over the parties and the subject matter of this case. Section 120.57(1), Florida Statutes (1979). In this proceeding the Respondent, County, has the burden of proving that it has given reasonable assurances that the short term and long term effects of the proposed project will not result in violations of the water quality standards of Chapter 17-3, Florida Administrative Code. Section 17- 4.28(3), Florida Administrative Code; Dowdy v. Department of Environmental Regulation, Case No. 79-219, Recommended Order (DOAH July 19, 1979). That burden has been carried. The water quality standards of a Class III body such as Sylvan Lake are set out in Section 17-3.09, Florida Administrative Code. There is a preponderance of competent and substantial evidence that those standards in either the long term or in the short term will not be violated by the proposed project. The requisite reasonable assurances have therefore been given by the applicant. Hand removal of aquatic vegetation from a 150 foot strip of shoreline on a 186 acre lake, will have at most, a de minimus impact on the marine life, water quality or neighboring biota of Sylvan Lake. The applicant has met the criteria for the issuance of a permit, pursuant to Section 17-4.07, Florida Administrative Code.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a final order be entered by the State of Florida, Department of Environmental Regulation determining that the requested dredge and fill permit be issued subject to the usual conditions and subject to the applicant's stipulation that any vegetation removal will be performed by hand and subject to any conditions contained in the Notice of Intent To Issue Permit. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 30th day of April, 1980. MICHAEL PEARCE DODSON Hearing Officer Division of Administrative Hearings Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Mr. & Mrs. Gilbert Lee Swartz Route 1, Box 228 DD South Sylvan Lake Drive Sanford, FL 32771 Nikki Clayton Seminole County Courthouse Room 302, 301 N. Park Avenue Sanford, FL 32771 Segundo J. Fernandez, Esq. and Stanley J. Niego, Esq. Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32301 Mr. Raymond Lipton Route 1, Box 60-A Longwood, FL 32750

Florida Laws (1) 120.57
# 9
GLORIA BENOIT vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002401 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002401 Latest Update: Jul. 25, 2005

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242