The Issue Is Respondent responsible for alterations to a dam over which Petitioner has jurisdiction? Has Respondent performed these alterations without the benefit of a permit issued by Petitioner? Should Respondent be required to make changes to that structure?
Findings Of Fact One and one-half miles east of Crestview, Florida, which is in Okaloosa County, a dam has been constructed. The dam construction has formed an impoundment area thereby altering the course of a tributary to the Shoal River, an Outstanding Florida Water Body. Respondent contributed to the construction which formed the dam. He did so without benefit of a permit from Petitioner. No other person has obtained a permit from Petitioner for the dam construction. Respondent is a resident of Crestview, Florida. At present the impoundment of water created by the dam is more that 10 feet but less than 25 feet in height from the natural bed of the water course at the down stream tow of the barrier formed by the dam. The work which has been done on the dam by the Respondent is based upon his belief that he is entitled to an easement at the stream crossing. The dam impoundment has no agricultural purpose. John Rittenour claims ownership of the land at the stream crossing and takes issue with Respondent's belief that Respondent has an easement for that crossing. Mr. Rittenour did not authorize Respondent to do the work at the subject site nor was Mr. Rittenour responsible for performing work at the subject site independent of Respondent's activities. There is no dispute concerning Respondent's ownership of property in the vicinity of the stream crossing. Prior to March, 1990, Respondent had made certain changes at the subject site to maintain a vehicular crossing. The pre-March, 1990 changes were to a structure which used a culvert to allow the water in the stream to flow through the crossing. In addition Respondent was trying to create a water impoundment area behind that structure prior to March 1990. The nature of these activities was not such that the Petitioner had a basis for imposing the regulatory requirement that Respondent obtain a permit to conduct the alterations at the subject site. In March, 1990, the dam at the subject site breached. As a consequence, other structures down stream also failed. Those structures belonged to Mr. Rittenour. The breach created conditions unsafe to the public. In April, 1990, following the breach, Respondent reestablished the stream crossing. The work which he did created the present dam height which had been described. The stream crossing provides local residents with access to their homes. There is another route to those homes, but its future availability is in question. On July 30, 1993, Jerry Sheppard, Senior Field Representative for Petitioner, inspected the subject site. The findings that he made at that time are set forth in Petitioner's Exhibit No. 3. That Exhibit roughly describes the structure in question. In particular, it references the fact that the dam height is approximately 10.5 feet as observed through the form of measurement already described. The dam is 13 to 15 feet in depth. It's width is approximately 200 feet. It has horizontal culvert pipes to allow water flow through the dam. One pipe is 18 inches in circumference. The other pipe is 36 inches in circumference. The inspection which Mr. Sheppard made on July 30, 1993, revealed that the changes to the structure following the breach in March, 1990, had increased the water impoundment area as to the landward extent of that water. Mr. Sheppard was concerned with safety problems associated with the dam which he observed on July 30, 1993. He found the overall construction to be of poor quality. There were problems with vertical slopes on the dam faces, trees were observed to be on the slopes and the aggregate material used for construction was sandy in composition. All these conditions contributed to the substandard construction. Mr. Sheppard was also concerned about a change in the surface water volume that was created with the increase in the impoundment area. This could cause greater safety hazards in a future dam breach than had been occasioned by the March 1990 breach. The March experience released a lesser volume of water by comparison to the expected volume of water with a future breach. Lance Laird, P.E., had accompanied Mr. Sheppard on the inspection at the subject site that was conducted on July 30, 1993. Mr. Laird is an expert in agricultural engineering and design of small dams. Mr. Laird is employed by Petitioner and was in its employ in 1993. Mr. Laird's observations concerning the dam that were made on July 30, 1993 are memorialized in a document which Mr. Laird prepared on August 2, 1993. That document is Petitioner's Exhibit No. 5. Pertinent to this case, Mr. Laird notes that the method of establishing the dam height was done by shooting the dam centerline at 50 foot intervals and the elevation of the tow by examining the elevation of the normal ground at station 1+75. Specifically, the dam crest was found to be at a height of 10.48 feet to 11.04 feet. Therefore, it was established that the maximum impounding capacity would be at 11.04 feet of dam height. On September 7, 1993, Mr. Sheppard spoke with the Respondent. Respondent told Mr. Sheppard that the Respondent had an easement across the stream to allow access to property away from the stream. For that reason, Respondent told Mr. Sheppard that Respondent believed he could make alterations or repairs to the structure at the stream crossing that would be acceptable. Respondent also told Mr. Sheppard that the stream crossing structure was there before Respondent purchased property in the area and that Respondent had been responsible for making the repairs which are under consideration in this case. On this occasion Respondent told Mr. Sheppard that there were three or four mobile homes further down the lane from the stream crossing, in addition to one house site located in the area of the stream crossing. Respondent's Exhibit No. 4 is a memorandum concerning the telephone conversation which was conducted between Mr. Sheppard and the Respondent on September 7, 1993. As described in the August 2, 1993 memorandum which reflected the findings on July 30, 1993, the road crossing was over a dam found at the perennial stream which goes under the roadway formed by the dam. As Mr. Laird observed, the effect of the two culverts is to back the water up to within 3 feet of the dam crest. A plywood stop-log is placed over the entrance of the 36 inch pipe that serves as a principal spillway. There is a plywood plug for the inch pipe; however, it was not installed on July 30, 1993. On that date Messrs. Sheppard and Laird noted a washed out area that serves as the emergency spillway that was approximately 20 inches wide. When Mr. Laird made his inspection on July 30, 1993, he was of the opinion that the dam would not meet current engineering standards for construction of an earthen impoundment dam. In particular, he believed that the utilization of horizontal pipes and the history of failure of the structure were indications that the dam did not have the hydraulic capacity to meet the design storms that are anticipated for this area. The location of the 36 inch pipe was such that it was canterlevered out from the road fill by about 5 feet. The side slopes were from steep to vertical on the back slope. The upstream slopes were not found to be as steep. In the August 2, 1993 report Mr. Laird expressed the opinion that the facility/dam needed to be modified to meet hydrological/hydraulic requirements and other construction standards for dams used as access roads. Mr. Laird specifically noted that a further dam breach would have adverse affect on Mr. Rittenour's property, and ponds which were down stream and possibly cause the failure of structures that Mr. Rittenour had put in place, all leading to the possibility of the release of sediments into the Shoal River. On November 3, 1994, Mr. Laird returned to the subject site for further inspection. He rendered a report of that inspection on November 4, 1994. That report is found as Petitioner's Exhibit No. 7. In the course of the November 3, 1994 inspection Mr. Laird observed that the appearance of the dam was similar to that on July 30, 1993. The principal difference was that logs and debris were now present in the inlet and outlet ends of both of the culverts/pipes. Some of the logs were fairly large. One log was estimated to be 12 to 14 inches in diameter and 20 to 25 feet long. This log was at the outfall of the 36 inch pipe. The consequence of this debris in the areas of the two pipes was to restrict the hydraulic capacity of the system. This was made more significant because the horizontal pipes had inherent limitations on their hydraulic capacity. Under the circumstances it was imperative that the debris be removed. On this visit Mr. Laird also noted that the pipes were uncoated and rusting, thus limiting their life span. On this visit Mr. Laird noted that the emergency spillway had now become filled with sediments that had eroded from the road leading down the hillside to the dam site. Mr. Laird expressed a concern about the method of construction and the material used in that construction and the susceptibility of those fill materials to erode. In particular, Mr. Laird observed that the material was sandy and for that reason susceptible to erosion. Finally, Mr. Laird noted upon this visit that the sizing of the culverts had not been proven to be adequate when considering their intended function in the dam. On November 15, 1993, Messrs. Morgan, Laird, Sheppard and Mitchell May met with the Respondent and his attorney at the subject site. The outcome of that meeting is memorialized in the memorandum from Mr. Morgan dated November 16, 1993, a copy of which is Petitioner's Exhibit No. 2 admitted into evidence. In the November 15, 1993 meeting, Respondent and his attorney were told about the various concerns which the Petitioner had about this dam consistent with the prior observations made by Petitioner's staff as described in this recommended order. Discussions were held concerning the means of correcting the problems. At this time Respondent indicated that he had been informed, by someone who was not identified, that the alternate route for residents in the area to gain access to their homes was being closed and that the stream crossing would then form the only means of ingress and egress to those properties. Respondent explained that he had spent $3,000 in improving the dam. Further he made mention that he had originally sold 12.5 acres of property around the impoundment created by the dam and no longer had any interest in the property. Although no resolution was reached concerning the proper disposition of the problem created by the dam, Mr. Morgan noted in his November 16, 1993 memorandum that this safety hazard that had resulted from the impoundment of water at the dam site by virtue of the deficiencies in the dam construction must be corrected if the crossing was to be used as the sole access route into the residences which have been described. On November 19, 1993, Mr. Laird prepared a memorandum in response to the request by Respondent's counsel through correspondence dated November 8, 1993, concerning the method of establishing Petitioner's jurisdiction over the dam pursuant to the dam height. The November 19, 1993 memorandum coincides with prior observations about the method to be employed in establishing that jurisdiction which are set forth in this recommended order. A copy of the memorandum is Petitioner's Exhibit No. 6. Petitioner's Exhibit No. 6 has a rough sketch and other calculations in support of the determination of the dam height. Concerning Mr. Laird's testimony at hearing, he reiterated that the establishment of the dam height was through a measurement of the down stream site in which the elevation difference between the impounded water and down stream elevation at the stream bed were critical factors in determining the potential hazard should there be a further breach of the dam. As established by Mr. Laird, proper methods of dam construction must be carried out in accordance with accepted engineering practices. In trying to determine acceptable engineering practices Mr. Laird relies on his experience as a professional engineer and expert in the design of small dams together a number of publications, to include publications from the Soil Conservation Services on design of dams, the U.S. Corps of Engineers and the Bureau of Land Reclamation. As Mr. Laird described at hearing, the dam design is deficient in that it is not made of suitable materials. Those materials are sandy. This allows water to migrate through the dam and to saturate the dam, thereby making the dam more prone to failure. The slopes on the back side of the dame are so steep that they cannot be maintained. The dam is eroding and two gullies have formed extending up to the crest of the dam. There is a third pipe in the dam face which is 18 inches in diameter and it is rusting. This pipe was there before the dam breach in March, 1990. It was left in place when repairs were made following that breach. Its existence could increase the flow of water in the event of a failure of the dam or if this third pipe collapsed it could form a void in the dam face. The principal spillway for the present dam is created by the use of the newer pipes that were placed horizontally. The placement of those two pipes creates limited capacity for flow-through and their rusty condition creates limitations on the effective life of those pipes. Those pipes could not be relied upon to handle storm events. In anticipation of a storm event, the pipes are placed so high on the dam face that they could not be used to evacuate water to meet the contingency of an upcoming storm or flood event. This arrangement unlike a head gate or control device below the water surface, which would allow the evacuation of water to meet the upcoming contingency of a storm or flood event, is without utility. The placement of the present pipes at the dam site is so high that they cannot be relied upon to dewater in anticipation of such a contingency. As has been verified by observations of these pipes, horizontal pipes are prone to be clogged by debris. An appropriate spillway would have a means of protecting the spillway against clogging. The emergency spillway is inadequate in that it continues to be filled in from erosion of the hill above the emergency spillway. On the dam surface, trees, weeds and other debris make it difficult for someone to perform an inspection of the dam condition, which is a necessary activity. Those same materials can penetrate the dam surface and cause erosion or in some instances if a tree were to fall and break the surface of the dam could cause further erosion. In summary, the dam does not meet generally accepted engineering standards for design nor comply with the requirements of safety for small dams as established by the opinion of Mr. Laird. The dam poses a safety hazard to people using the dam to cross the stream and for the down stream landowners should the dam breach as it did in March 1990. Mr. Rittenour would not be opposed to having a stream crossing at the subject site to allow access to nearby properties. He is opposed to a dam at the site with its associated impoundment. Under the circumstances the appropriate means of addressing the problem of the dam would be to remove the dam and its associated impoundment of water and replace that structure with a crossing which would allow vehicular traffic. This disposition is consistent with the order for corrective action. This would involve the safe removal of water behind the present dam structure and reduce the risk of sudden release of an increased volume of water from a future breach when contrasted to the 1990 breach. In this solution the spillway pipes would be lowered to an elevation at the natural level of the stream, thus the impoundment would be ended with the new structure which would allow vehicular traffic to cross the stream. A one to two foot fill would need to be placed over the pipes to maintain the crossing as a roadway. This would lower the crest of the structure to an elevation just above the stream bed. During the course of any construction, sediment barriers would need to be placed downstream and in areas where the construction was ongoing to prevent problems with sedimentation. Grass would need to be placed on any disturbed areas and on the slopes of the new structure. Alternatively, the entire structure could be removed with proper controls being placed to protect against sedimentation and erosion in the area in question. Maintenance of the structure as a dam with its associated impoundment is not contemplated by this administrative action and would only be appropriate in the event that the dispute over the ownership of this site is resolved by informal settlement between Respondent and Mr. Rittenour or through litigation.
Recommendation Based upon consideration of the facts found and the conclusions of law reached, it is, RECOMMENDED: That a final order be entered which declares the dam and impoundment to be a public nuisance created by Respondent and informs the Respondent of the necessity to obtain a permit before removing the dam and impoundment and reestablishing the roadway at stream bed level. DONE and ENTERED this 12th day of December, 1994, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of December, 1994. APPENDIX Petitioner's proposed facts are subordinate to the facts found in the recommended order. COPIES FURNISHED: Gary J. Anton, Esquire Stowell, Anton and Kraemer Post Office Box 11059 Tallahassee, FL 32302 H. S. Harrell 3153 Alpin Road Crestview, FL 32536 Douglas Barr, Executive Director Northwest Water Management District Route One, Box 3100 Havana, FL 32333
The Issue Whether Respondent's statements as set forth in the First Amended Petition to Determine Validity of Agency Statements Defined as Rules are rules as defined in Section 120.52(15), Florida Statutes, which have not been promulgated as required by Section 120.54(1)(a), Florida Statutes.
Findings Of Fact Petitioner alleges that the following constitute agency statements defined as rules but not properly adopted as rules by the District: The District considers a particular parcel of property to be located within a "floodway" within the District's regulatory jurisdiction for Works of the District (WOD) permitting on the basis of the parcel being located within a floodway established pursuant to a currently-approved Federal Emergency Management Agency (FEMA) Flood Insurance Study (FIS). The District will not accept any alternative floodway boundaries that are inconsistent with those established in the FIS unless FEMA confirms that the alternative boundaries are more accurate than those obtained from the existing FIS, and FEMA approves the alternative boundaries through a formal approval process, such as a Letter of Map Revision that also requires local government concurrence. If the District determines the parcel to be within its regulatory floodway, it will require an Environmental Resource Permit (ERP) application for any development activities within the floodway, other than those entitled to a general permit under Rule 40B-4.3010, Florida Administrative Code. The District will require an ERP for the activities described in paragraph "c" notwithstanding the fact that the Department is evaluating those same activities as part of an ERP application that has been submitted to the Department of Environmental Protection (Department) for the same activity in the same location under the terms of the Operating Agreement.1/ The District will evaluate an application to conduct development activities as described in paragraph "c" based upon the full range of ERP permitting criteria contained in the District's rules, even though the Department is processing an ERP application for the same activities pursuant to the Operating Agreement between the District and the Department. The District's policy is to deny or to object to the issuance of any permit application to conduct commercial mining operations in the WOD composed of the Alapaha River floodway. It is the policy of the District to consider any proposed development activity in a WOD, other than those eligible for a general permit under Rule 40B-4.3010, Florida Administrative Code, to have an adverse impact on the regulatory floodway, and thereby to be unpermittable by the District. The District's policies against allowing development activities in WODs apply even if a professional engineer certifies under Rule 40B-4.3030, Florida Administrative Code, that the activity will not violate the conditions of issuance set forth in the rule. The policies apply because the District will consider the development activities to violate ERP permitting rules applicable to all development activities, not just those within WODs. It is also the District's policy to ask the Department to deny ERP applications for development activities proposed in WODs that require ERPs even though the Department is processing the application pursuant to the Operating Agreement. The District's policy is to deny ERP applications to conduct commercial mining activities in WODs as determined by the FIS, and to recommend to the Department that ERP applications to the Department for such projects be denied, unless the applicant goes through the FEMA amendment process described in paragraph b to remove the area from the FEMA- determined floodway. Each party requests that it be granted costs and attorney's fees pursuant to Section 120.595(4), Florida Statutes. Stipulated Facts Angelo's is a Florida Limited Partnership, whose address is 26400 Sherwood, Warren, Michigan 48091. Respondent is an agency of the State of Florida established under Chapter 373, Florida Statutes, with its address at 9225 County Road 49, Live Oak, Florida 32060. Angelo's owns property in Hamilton County approximately four miles to the east of Interstate 75 and to the north of U.S. Highway 41, immediately to the east of the Alapaha River. Angelo's conducts commercial sand mining operations on a portion of its property pursuant to various agency authorizations, including an ERP issued by the Florida Department of Environmental Protection (Department), Permit No. 158176-001, and a Special Permit issued by Hamilton County, SP 98-3. The ERP was issued by the Department pursuant to its authority under Chapter 373, Part IV, Florida Statutes. Angelo's mining operations constitute a "mining project" as that term is used in Section II.A.1.e of an Operating Agreement Concerning Regulation under Part IV, Chapter 373, Florida Statutes, and Aquaculture General Permits under Section 403.814, Florida Statutes, between Suwannee River Water Management District and Department of Environmental Protection (Operating Agreement). The Operating Agreement has been adopted as a District rule pursuant to Rule 40B-400.091, Florida Administrative Code. Angelo's has filed with the Department an application to modify its ERP to expand its sand mining operations into an area of its property immediately to the west of its current operations (the "proposed expanded area"). Angelo's application is being processed by the Department at this time. Angelo's ERP modification application is being processed by the Department under the Operating Agreement. The District has asserted permitting jurisdiction over the proposed expanded area because the proposed sand mining activities would occur in what the District asserts to be the floodway of the Alapaha. The District asserts that an ERP would be required from the District so that the District can address the WOD impacts. It is the District's position that the District's review of any ERP application to undertake development activities in a WOD would be based upon all of the ERP criteria, and not just those criteria relating to floodway conveyance referenced in Rule 40B-4.3030, Florida Administrative Code. On or about November 30, 2001, the District published in the Florida Administrative Weekly a notice of its intent to adopt the FEMA Flood Insurance Rate Maps (FIRM) to delineate floodways for the purpose of its works of the district regulatory program. Facts Based on Evidence of Record Background/Events leading up to this dispute The total amount of the subject property owned by Petitioner is approximately 560 acres. The property is generally a rolling terrain. A significant feature is a man-made berm which was placed around the perimeter of the property by a former owner, presumably to keep water off of the land during floods of the Alapaha River. Dennis Price is a self-employed registered professional geologist. At one time, he was employed by the District and at another time, he was employed by Petitioner. For purposes of this proceeding, he was hired by Petitioner as a consultant for certain permitting projects including the project that gave rise to this dispute. Mr. Price met with and corresponded with the District as well as staff from the Department over a period of two years regarding this mining project. In June of 1999, the Department wrote to Mr. Price in response to a meeting. The letter noted that Petitioner intended to expand mining operations. In addition to informing Mr. Price of the Department's permit requirements, the letter referenced the District's permitting requirements: Mr. Still provided us with an aerial photograph showing the SRWMD's regulated floodway in the area of your mine. A copy is enclosed with the floodway line highlighted in orange. A substantial portion of your proposed expansion area will be within this floodway. The SRWMD has adopted the Alapaha River and its floodway as a works of the district. The Department adopted the SRWMD's regulations pertaining to the environmental resource permit; however, this did not include the regulations pertaining to projects within works of the district. If your permit application only includes areas outside of the floodway, a single application will have to be provided to this bureau. If you intend to expand within the floodway, a separate application will also have to be provided to the SRWMD for a works of the district permit. In either situation, the Department's Jacksonville office will review any modifications to your industrial wastewater permit. (emphasis supplied)2/ In response, Mr. Price wrote to the Department in July of 1999 and stated in pertinent part: Dear Mr. Neel, this letter is in response to your June 22, 1999 letter "RE: Permits for Mining Operation". Angelo's currently has a Sand and Limestone General Permit from DEP - General Permit Number FLA011635. That permit is based on a 5 year mining plan that was presented to the DEP on January 11, 1999. The permit, my letter and the 5 year mining plan presented to DEP are enclosed. Another attachment is an aerial photo of the property showing the Regulatory Floodway line and the location of the areas to be mined under that 5 year mining plan. The aerial photograph has superimposed upon it the location of the floodway of the Alapaha River, as determined by FEMA maps. Please note that the 5 year mining plan and the associated storage and processing areas are outside the regulatory floodway. Therefore, no works of the district permit will be needed at this time. See FAC Rule 40B-4.300(1)(a) [sic]. Future mining beyond the five year mine plan will not occur without first applying for and obtaining permits from the appropriate regulatory agency. At the present time we will only mine areas within the 5 year mine plan. We will have an engineer field locate the floodway line on the property to ensure that no mining or associated storage and process activities occur within the floodway. We are requesting that the ERP permitting process remain within the DEP bureau of Mine Reclamation since the DEP has already issued a general permit for this activity and the DEP normally handles ERP's for mining operations. We have determined that the mining area will be less than 100 acres, and based on Rule 40B-4.2020(2)(B) FAC a general permit may be applied for. We will notify you when we have a draft application prepared and would like to meet with you at your earliest convenience after that to discuss the permit application. (emphasis supplied) In response to information which Mr. Price provided to the Department, the Department wrote to Mr. Price in December of 1999 and again addressed concerns about the area of the project in relation to the floodway line: Specific Item: FLOODWAY Information submitted in response to the request for additional information (RAI) dated August 12, 1999, indicates that Angelo's proposed project boundary and activities extend up to and coincide with the Floodway Line. There appears to be no set-back or buffer from the Floodway (or any other) Line. Chapter 40B-4, Florida Administrative Code (F.A.C.), contains the rules for the Suwannee River Water Management Area which were adopted by the Department of Environmental Protection. Section 40B-4.2010(2)(b)(3)(b) provides that a General Permit may be issued for construction, operation, and maintenance of a surfacewater management system servicing a total project area less than 120 acres provided the system will not be located in, cross or connect to a work of the district. Information submitted with this (November 12, 1999) submittal indicates that the proposed activities within the proposed project coincides with, or is so closely located to, the Floodway Line so as to indicate that the proposed activities would be considered to be connected to a work of the district. This is based upon examination of the plan views and [sic] well as cross section information that has been provided. Please provide a discussion, and drawings as may be needed, that addresses all activities along the established Floodway Line. This information should address all aspects of all operations along this line through the completion of reclamation activities. Be sure to address best management practices, and any proposed setbacks in the response to this request. (emphasis in original)3/ Mr. Price described the proposed project as part of the permit application which was submitted to the Department: Describe in general terms the proposed project, system, or activity. Angelo's Aggregate Materials, Ltd. (AAM) owns approximately 341 acres of land. The current mining site, known as the Jasper Pit, is located on a 160 acre parcel of land. Of the 160 acres, only 82.45 acres are available for mining since the remainder of the property falls within the floodway boundary of the Alapaha River. The 160 acre parcel has an existing berm around the entire perimeter of the property constructed in the 1950's by the previous owner. The Alapaha flood study conducted for FEMA did not take into account this berm. AAM is proposing to construct a 20' wide access road between NW 8th Boulevard and the Jasper Pit, encompassing approximately 7.22 acres. This roadway will be constructed within the limits of property owned by AAM. The stormwater management system for the roadway will consist entirely of grassed swales as covered under FDEP's swale exemption. The Jasper Pit is a sand and limestone mining operation. (emphasis supplied) On August 28, 2001, David Still, the District's Director of Resource Management, wrote a letter to the Department in response to a request received by e-mail from the Department for technical assistance. Mr. Still responds to requests for technical assistance from other agencies as a matter of routine and as contemplated by the operating agreement between the Department and the District. The letter reads as follows: The floodway along the Alapaha River was identified and mapped as part of a Federal Emergency Management Association (FEMA) flood study performed by the United States Army Corps of Engineers, subsequently approved by FEMA and adopted as part of the local government (Hamilton County) ordinance. Based on the above, Suwannee River Water Management District (SRWMD) then adopted the floodway as a Work of the District (WOD). There is only one floodway. SRWMD recognizes and accepts the FEMA flood study performed by the U.S. Army Corps of Engineers and local government (Hamilton County) floodway boundary as the best available information to identify the floodway boundary. There is a formal process whereby change can be made to the FEMA boundary with additional or improved information. If FEMA and Hamilton County approve a revised floodway delineation and boundary, so be it, SRWMD will recognize it, however, SRWMD will not unilaterally change a boundary resulting from a detailed federal flood insurance study. We have informed Mr. Thompson and his client of this. We consider the kind of work contemplated by the applicant (at least based on our earliest discussions with them) will cause an adverse impact to the WOD (the floodway) which of course is in conflict with the requirements of 40B-400.103(1)(h) and SRWMD 40B-4, Part III, Florida Administrative Code (F.A.C.). The District will object to the issuance of any permit in direct conflict with District rules. We feel the rule is clear and any conflict with 40B-400.103(1)(h), F.A.C. which the Florida Department of Environmental Protection has adopted by reference requires denial of the Environmental Resource Permit (ERP) application. Any work of this nature within a WOD is subject to the additional permitting requirements of 40B-4, Part III, F.A.C., even if the District needs to implement such requirements with a separate WOD permit. Mr. Still's reference to "the applicant" in the August 28, 2001, letter is to Petitioner. While Mr. Still is not the agency head, his August 28, 2001, letter clearly communicates the District's policy. Given his position in the agency and the manner in which he discussed this issue, the letter describes and communicates the District's policy on what constitutes a floodway and its boundary. Mr. Still does not have final authority to make decisions on permitting within the District, as that authority rests with the governing board. In a letter written on October 10, 2001, in response to a letter from Petitioner's counsel, Mr. Still stated that District staff would recommend to their governing board that Petitioner's proposed activity is an activity within a floodway that is regulated under Chapter 40B-4, Part III, Florida Administrative Code, and that the proposed activity would adversely impact the floodway: "Therefore, as staff, we would recommend our governing board consider this activity adverse to our rules." This letter is case specific to Petitioner. Within a few days of Mr. Still's October 10, 2001, letter, Petitioner filed its Petition to Determine Validity of Agency Statements Defined as Rules. Other facts established by the evidence of record The District uses FEMA FIRM maps as evidence of the location of the floodways in the works of the district. The District communicated this policy in Mr. Still's letter dated August 28, 2001. The District will not unilaterally change the floodway delineation and boundary established by FEMA. In order for an applicant to persuade the District that a proposed activity within the FEMA floodway line is not within the District's floodway, an applicant must apply to FEMA for a map amendment or revision. The District will acknowledge that a proposed activity is not within the floodway of a work of the district only if the applicant is successful in obtaining a map amendment or revision showing that the proposed activity indeed is not within the floodway. The District has applied this policy to another company which applied for a permit. That is, the District required the permit applicant to apply to FEMA for a map revision or amendment as a condition of issuance of a permit because its proposed activity was within the FEMA floodway as established by the FEMA maps. Petitioner has not filed a permit application with the District regarding the proposed mining project. It is Petitioner's position that to do so would be futile.
The Issue Whether Southern Hy Power Corporation (Hy Power) has provided reasonable assurance, based on plans, test results, or other information, that its proposed hydroelectric facility will comply with the Management and Storage of Surface Water (MSSW) statutes and rules of Southwest Florida Water Management District (SWFWMD) and the Wetland Resource Management permit (WRM)/water quality certification statutes and rules of the Florida Department of Environmental Protection (DEP).
Findings Of Fact By Joint Prehearing Stipulation the parties agreed to the following description of the parties and the project: PARTIES: The Department of Environmental Protection (the Department) is a government agency in the State of Florida existing by virtue of Section 20.255, Florida Statutes, and operating pursuant to Chapters 253, 373, 376, and 403, Florida Statutes, and Title 62, Florida Administrative Code. Under an interagency agreement with SWFWMD, the Department also implements Title 40D, Florida Administrative Code. The Department is located in Tallahassee, Florida, and it has a district office in Tampa, Florida, which district includes Levy County. Southern Hy Power Corporation is a Florida Corporation whose principal offices are located at 7008 Southwest 30th Way in Gainesville, Florida. Betty Berger is an interested party with a mailing address of Post Office Box 83, Inglis, Florida. The Campbells are an interested party with a mailing address of 245 Palm Street, Inglis, Florida. Hy Power applied on August 31, 1993, to the Department for a WRM permit/water quality certification to construct a hydroelectric facility on the Inglis By-Pass Channel. The project is located in Section 12, Township 17 South, Range 16 East, within the town of Inglis in Levy County. The facility consists of a powerhouse located on the south side of the channel measuring about 28 feet wide by 115 feet long, drawing water from the Inglis By-Pass Channel, passing it through a single-pit type turbine and discharging downstream of the Inglis By-Pass Spillway Dam. Hy Power applied on August 4, 1998, to the Department for a MSSW permit for the same proposed hydroelectric facility on the Inglis By-Pass Channel. DESCRIPTION OF PROPOSED PROJECT The project involves the construction of an intake structure, powerhouse, and tailrace on a 0.61-acre area located on the south side of the existing Inglis By-Pass Spillway. The facility will take advantage of the existing hydrostatic head that exists on either side of the Spillway Dam, to generate electricity. The powerhouse will be constructed below grade and will contain a single megawatt turbine and generating unit. The intake structure will divert flows from the upstream side of the Spillway Dam through the powerhouse and back into the By-Pass Channel. A small one-story control building and low profile substation will be constructed above grade within the boundaries of the project area. The hydroelectric project is considered to be a "Run of the River" type of facility because it can only use that water which flows down the existing channel. The geometry of the channel restricts flow to a certain amount, therefore the project cannot create or use flows above those that the By-Pass Channel can provide. The overall authority for control of water levels in Lake Rousseau and flow to the lower Withlacoochee River will remain with the DEP. Lake Rousseau was created in 1909 when the Inglis Dam was constructed across the Withlachoochee River for the purposes of hydroelectric generation. The dam impounds over 11 miles of the Withlachoochee River and forms a lake approximately 3,000 to 4,000 acres in size. Prior to construction of the Barge Canal, water released from the Inglis Dam would flow down the lower portion of the Withlachoochee River about 10 miles before entering into the Gulf of Mexico. In the mid to late 1960's the Army Corps of Engineers (ACOE) built a portion of the Cross Florida Barge Canal between the Gulf of Mexico and Lake Rousseau. The canal severed the Withlachoochee River downstream of the Inglis Dam causing its flow to be diverted into the Barge Canal and then into the Gulf. In order to maintain the flow of freshwater from Lake Rousseau to the lower segment of the River, the 8,900-foot long Inglis By- Pass Channel and Spillway were constructed. The resulting downstream flow ensures navigation in the lower portion of the River and sustains its freshwater and estuarine environment. The water level in Lake Rousseau is generally maintained at an elevation of 27.5 feet above mean sea level (msl) by a combination of the Inglis Dam, the Inglis Lock, which is located in the Barge Canal, and the By-Pass Channel Spillway. These water control features are known collectively as the Inglis Project Works. The water levels in the lower Withlachoochee River immediately to the west of the By-Pass spillway are close to sea level. The resulting head provides the potential energy needed to drive the proposed generator turbine. Under normal conditions the majority of water released from Lake Rousseau flows over the Spillway Dam into the lower segment of the River. According to the DEP Office of Greenways and Trails (OGT), the maximum capacity of the existing By-Pass Channel Spillway is 1,540 cubic feet per second. The hydroelectric project will divert whatever flow is allowed around the existing spillway through the turbine and back into the channel. When the Cross Florida Barge Canal project was cancelled in the 1990's, the ACOE transferred ownership of the property to the State of Florida Board of Trustees, who in turn has leased the property to the DEP for use as the Cross Florida Greenbelt State Recreation and Conservation Area. Management of this property, the control of river flow and lake levels, and operation of the Inglis Project Works are exercised by the DEP's OGT. The OGT utilizes a document entitled "Water Control Plan for Inglis Project Works," dated September 1994, as a guide to operating the structures. The Water Control Plan is incorporated as part of the MSSW intent to issue. On or about April 25, 1995, the Governor and Cabinet, sitting as the Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), approved a request from Hy Power to sublease 0.61 acres of Greenway property at the project site for the purpose of providing electric power. The request was challenged by Berger and the Campbells, and resulted in an administrative hearing held on November 3, 1995. As a result of the hearing, Administrative Law Judge Larry Sartin entered a Recommended Order on July 12, 1996, that the Board enter an order approving execution by the DEP of the proposed sublease and dismissing the petition of Berger and the Campbells. The Recommended Order was approved by the Trustees in its entirety in a Final Order dated April 12, 1996 ("Final Order"). Berger v. Southern Hy Power Corporation et al., Case No. 95-3589. A copy of the Final Order is listed as an exhibit to this Stipulation, and the Findings of Fact and Conclusions of Law contained therein are adopted herein. As previously ruled by the undersigned, the previous Final Order is res judicata as to Petitioners in this case, who are collaterally estopped from challenging any of the findings of fact or conclusions of law contained in the previous Final Order. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Final Order with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the Findings of Fact or Conclusions of Law in the Final Order. On February 21, 1995, Hy Power filed application with the Federal Energy Regulatory Commission (FERC) for a conduit exemption from the licensing requirements of Part I of the Federal Powers Act (FPA) for the proposed project. Petitioners and various other persons filed protests with FERC in opposition to the project. On April 21, 1997, FERC issued an Order Granting Conduit Exemption, a copy of which is listed as an exhibit to this Stipulation. Petitioners in this case are collaterally estopped from challenging any of the findings or conclusions contained in that Order Granting Conduit Exemption. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Order Granting Conduit Exemption with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the findings or conclusions in the Order Granting Conduit Exemption. FACTS ADDUCED AT HEARING OUTLINE OF PROJECT The proposed project calls for the construction of a water retention structure along the existing By-Pass spillway, the excavation of a large hole in which the powerhouse and turbine would be constructed "in-the-dry" south of the existing dam, and a millrace below the proposed project to return the water back into the existing water course. Conflicting testimony was received regarding the facts surrounding the construction of the project. These included: whether the proposed project will touch the existing wing walls of the existing dam; whether the water retention structure is a coffer dam; whether the proposed water retention structure will safely retain the water; whether the powerhouse and turbine have sufficient negative buoyancy to stay in the ground; whether the proposed excavation will weaken the existing dam; and whether the de-watering of the excavation site will adversely impact ground and surface water. PROJECT DESIGN AND ENGINEERING Engineering for the project was directed by witness Richard A. Volkin, a professional engineer and president and CEO of Engineering Company, Inc., based in Canton, Massachusetts. Mr. Volkin has extensive national and international experience in the design, management, and operation of hydroelectric facilities. Other engineers in Mr. Volkin’s firm worked on the project under Mr. Volkin’s direct supervision, including John May, who became registered as a professional engineer in Florida in order to sign and seal the engineering drawings for the project, which he initially did around 1994. Mr. May became ill and retired in 1998. Because of the length of time the application process has taken and the fact that Mr. May retired, there was a time while the application was pending, when Hy Power's design team was without a registered Florida engineer. When this was brought to the attention of Hy Power, Hy Power substituted Steven Crockett for Mr. May as the Florida-registered professional engineer of record for the project. DEP routinely accepts an applicant’s changing its engineer of record during the course of permit application or construction. Mr. Crockett is a civil and structural engineer who has considerable experience in preparing dam structural designs. Mr. Crockett independently reviewed and evaluated the engineering drawings for the project. Mr. Crockett resealed the drawings by using his drawn seal and signing the plans because his embossed seal was not readily available and time was of the essence. Mr. Crockett has advised DEP that he is now engineer of record for the project, using the appropriate DEP forms. Mr. Volkin’s firm performed all of the studies required by the various agencies, including a geotechnical study of the area, a 50-year analysis of water flow in and out of the Lake Rousseau regime, and water quality evaluations of water in the By-Pass Channel. The ACOE performed deep hole borings of the soils (approximately 36-40 feet below sea level) in the area of the project site to determine soil stabilization conditions at the site when they were constructing the Inglis Project Works. The soil conditions found can reasonably be expected to be similar today. Mr. Volkin’s company also took its own eight-foot deep surface core samples. The purpose of those samples was to verify the ACOE data. The new core samples verified the original core samples. Mr. Volkin also reviewed the ACOE’s engineering drawings developed from construction of the Spillway Dam. These show that the dam is founded on limestone bedding that has been stabilized with concrete. The hydroelectric facility will be constructed adjacent to and south of the dam structure and adjacent to and north of the barge canal. The same type of limestone bedrock is found in the area of the proposed construction. The facility design includes an intake channel on the upstream channel and a tailrace downstream. Those are the only structures that will be constructed next to the By-Pass Channel. The construction of the facility itself will be "in the dry." Hy Power will use coffer dams to seal off the construction site from the By-Pass Channel, so that there will not be water leakage from the Channel into the construction site. Water from the By-Pass Channel will enter the power plant when the coffer dams are lifted and the water is allowed to flow into the facility. The Petitioners presented the testimony of Bill Edwards, an individual with considerable experience in the construction of bridges, cofferdams, and similar concrete structures in aquatic and semi-aquatic conditions. Mr. Edwards is a former hard-hat diver who worked all over the world and worked in Florida for many years prior to his retirement. Based upon his experience and expertise in construction related to projects of this type, his testimony is credible and worthy of consideration. Mr. Edwards pointed out that if the proposed water retention structure did not touch the wing wall of the existing dam, it could not keep the water out and would not have the strength that it needed to retain the water. Hy Power’s witnesses explained that the retention structure would be set close enough to the existing wing wall that waterproofing materials could be placed between the two structures to keep the water out. Further, that the existing plans did not show interior bracing which would be included for structural strength and integrity. In sum, the retention structure will be in contact with existing dam’s wing wall, but will be free standing and not dependent upon the strength of the wing wall for its strength. Mr. Edwards pointed out that a cofferdam by definition has walls on all sides of the structure. The structure proposed by Hy Power did not have walls all the way around the proposed excavation. In rebuttal, Hy Power presented evidence that its plans were conceptual, design drawing and not construction plans. Hy Power represented that in actuality it would put as many walls as were necessary to keep the water out of the hole it intended to excavate. Trash racks will be constructed at the intake structures to protect aquatic life and make sure that trash and vegetation do not enter the intake structure or go down river. The trash rack bars will be two inches on center, which the U.S. Fish and Wildlife Service has determined as the appropriate size for the protection of fish. The turbine blades are "double regulated," and operate generally between 60 and 90 revolutions per minute. The design enables the turbine to operate at a constant speed to generate a consistent flow of electricity, notwithstanding the fact that the flow of the water may vary. The blade speed is not very fast, and the 2.5-meter blades provide a two to three-foot opening. This design acts to prevent fish mortality. There are four ways to shut off the flow of water through the proposed structure: close the pitch of the blades, close the wicket gates, allow the counter balance to the wicket gates to kick in and automatically close the gates, and close off the main gates. This is a fail safe system ("four level redundancy") designed to work upon any failure. Once water goes through the generator, its velocity is reduced to no greater than its intake rate which is a maximum of three feet per second. This prevents the water being discharged from the tailrace from causing erosion. If the head of water in the dam produces a flow exceeding three feet per second, it can be diverted over the other dams which will be functional. The power plant will be encased in concrete, except for a small access way that enables a person to go down a set of stairs to the plant. It will be a sealed, waterproof structure, as required by FERC and the ACOE. This will prevent penetration of groundwater, or flood waters in the event a massive flood overtops the plant. The only water entering the powerhouse will be through the turbine tunnel for power generation purposes. Mr. Edwards pointed out that the powerhouse was a closed structure and as such would have positive buoyancy, that is, it would float. Mr. Edwards pointed out that the proposed site is between the barge canal and By-Pass spillway and there is a great deal of groundwater and potentiometric pressure in the existing water table. In sum, there is a unlimited supply of groundwater at the site, and powerhouse could float out of the ground just like an empty swimming pool. Hy Power presented rebuttal evidence that the weight of the building, the turbine, and the water flowing through the turbine would be close to negative buoyancy, and they would add additional weight to the structure as necessary to keep it in place. The project is designed to generate three megawatts of electric power which is enough electricity to serve between 300 and 3000 homes, depending on usage. The project is designed to be unmanned. This is common for facilities such as this. The plant can be operated by remote control, unlike the existing controls at the By-Pass Dam, which are operated manually. DEP can access, monitor, and control remotely the generator's operation to include shutting the facility down at any time. There will be remote sensors to monitor water elevations. Flood protection will improve because of the ability of DEP to manage water flow from a remote location. If there is any major disruption, the plant will shut itself down. The project is classified as "green power." In other words, it generates natural energy without any disruption to the environment. The project will have minimal to no impact on the environment. There will be no significant changes in water quality compared to existing conditions as a result of either construction or operation of the facility. WRM Permit Criteria Hy Power has provided reasonable assurances that the proposed project will not cause a violation of state water quality standards of Section 403.918(a), Florida Statutes (1991). The parties stipulated that turbidity and dissolved oxygen were the two surface water quality issues of concern in this proceeding. The receiving water body is the Inglis By-Pass Channel. The Inglis By-Pass Channel is a Class III surface water. The project is not located in a OFW. While the lower Withlacoochee River is an OFW, the OFW designation runs up the natural river itself, and does not include the Spillway Dam, tailrace, or the remainder of the By-Pass Channel. There would be no degradation of water quality at the point of contact with the Withlacoochee River OFW. The DEP and FERC looked specifically at potential for turbidity and dissolved oxygen in determining whether the project would violate state water quality standards. The standards for turbidity and dissolved oxygen will not be violated. Because the By-Pass Dam is an under flow structure, a minimum of oxygenation currently occurs as water flows through the existing dam. The proposed project runs the water underground through the generator; however, Hy Power will measure the dissolved oxygen below the dam in the Lower Withlacoochee River. In the event there is any lowering of dissolved oxygen, Hy Power can install a "sparge ring" to reoxygenate the water going through the turbine so that dissolved oxygen remains at current levels. No turbidity will be added to the receiving water as a result of the project, because water velocity is low and the structure is encased in concrete and rip-rap. The only other potential for turbidity would occur when the coffer dams are removed after construction is complete. The coffer dams can be removed with the generator closed to permit any turbidity to settle. The amount of siltation that might occur when the generator is opened would be insignificant. Where a project is not in a OFW, an applicant must provide reasonable assurance that the project will not be contrary to public interest. See Section 403.918(2), Florida Statutes (1991). Hy Power has provided such assurances. The project will not directly affect public health, safety or welfare, or the property of others. See Section 403.918 (2)(a)1., Florida Statutes. There are concerns relating to the structural integrity of the proposed facility and adjacent structures which are discussed extensively below. The project will have no adverse impact upon the conservation of fish and wildlife, including threatened and endangered species and their habitat. See Section 403.918 (2)(a)2., Florida Statutes. While manatees are not likely to be found at the project site, the installation of the trash racks will eliminate any potential adverse impact on manatees. In fact, the racks will be an improvement over the current unprotected Spillway Dam. DEP procedures require a specific manatee control plan be implemented to deal with site specific concerns. The project will not adversely affect navigation or the flow of the water or cause harmful erosion or shoaling. See Section 403.918(2)(a)3., Florida Statutes. The project will not adversely affect fishing or recreation values or marine productivity in the vicinity of the project. See Section 403.918(2)(a)4., Florida Statutes. The permanent project and its construction will cause no significant environmental impacts. See Section 403.918(2)(a)5., Florida Statutes. There will be no adverse impacts to significant historical and archeological resources. Section 403.918(2)(a)6., Florida Statutes. With regard to the impact on current conditions and relative value of functions being performed by the areas affected by the proposed activity, there will be no negative impacts. See Section 403.918(2)(a)7., Florida Statutes. Improvement will result from better control of water flow at the project site, installation of trash racks and implementation of green power. THE FORESEEABLE ADVERSE SECONDARY OR CUMULATIVE IMPACTS Potential adverse secondary impacts related to power transmission are addressed through the fact that there is an existing power line corridor that can be used to transmit the electricity. Any need to change the corridor could be addressed by subsequent DEP permitting. Cumulative impacts are not at issue. Mr. Gammon, with Florida Power, acknowledged that the current electric company, presumably Florida Power, would be required by FERC to transport the electricity generated by Hy Power over its existing corridor and poles. No final decision has been made regarding how to access the site with equipment during construction. Several feasible construction options exist, and there are several ways of accessing the site with heavy equipment vehicles and without impacting wetlands. Any final decision would be subject to DEP approval. Since the project meets the public interest criteria of Section 403.918(2)(a), Florida Statutes, and wetland impacts are minimal, the project is permittable without the need for mitigation. See Section 403.918(2)(b), Florida Statutes. The ACOE has issued a permit for the facility. The permit varies slightly from the DEP intent to issue in the use of reinforced concrete rather than rip-rap on the bottom half of the intake channel. This is to comply with ACOE preference, but the variation has only an environmental benefit. Counsel for Petitioners sought to elicit testimony from Linda Sloan, Executive Director of the Withlacoochee Regional Planning Council, with regard to compliance of the proposed project with the Town of Inglis Comprehensive Plan and Land Development Code. Such compliance is not relevant to this proceeding. At any rate, Ms. Sloan conceded that any prohibition that might apply in the Land Development Code to construction of the proposed facility could potentially be alleviated by exemption or variance provisions in the Code. MSSW PERMIT CRITERIA The project will provide adequate flood protection and drainage in the conventional sense. See Rule 40D-4.301(1)(a), Florida Administrative Code. Because the amount of impervious area is minimal, runoff from the project will not in any way contribute to increased flooding or adversely impact drainage patterns. The total amount of impervious area of the facility is less than that of a single-family residence. SWFWMD rules do not even require MSSW permits for single-family residences because the impact is not significant. The only purpose for requiring a MSSW permit for the project is to review the project’s potential downstream impacts to the watershed, not stormwater runoff from the facility itself. The project will not cause adverse water quality or water quantity impacts on adjacent lands in violation of Chapter 373, Florida Statutes, or cause a discharge that violates state water quality standards. See Rule 40 D-4.301(1)(b), Florida Administrative Code. As indicated by the WRM water quality findings above, the project will not generally violate state surface water quality standards. See Rule 40 D-4.301(1)( c), Florida Administrative Code. The project will not generally cause adverse impact on surface or groundwater levels or flows. See Rule 40 D- 4.301(1)(d), Florida Administrative Code. Since the project is a run-of-the-river, it will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it under Chapter 40D-8, Florida Administrative Code. The project will not cause adverse environmental impacts, or adverse impacts to wetlands, fish, and wildlife or other natural resources. The project can be effectively operated and maintained. See Rule 40D-4.301(1)(g), Florida Administrative Code. The project is a slow speed, low maintenance facility. The design concept is well established and has been successfully used for many years. Possible adverse affects to public safety are discussed below. The project is consistent with the requirements of other public agencies. See Rule 40D-4.301(1)(i), Florida Administrative Code. Potential harm to water resources within the SWFWMD are discussed below. See Rule 40D-4.301(1)(j), Florida Administrative Code. The proposed project generally will not interfere with the legal rights of others. See Rule 40D-4.301(1)(k), Florida Administrative Code. The proposed project is not against public policy. See Rule 40D-4.301(1)(l), Florida Administrative Code. The project complies with the requirements contained in the Basis of Review. See Rule 40D-4.301(2), Florida Administrative Code. There is a dispute as to whether the project was within or at the edge of the 100-year flood plain. This dispute is related to how one interprets the rule as it relates to the millrace and the location of the facility which is under ground. In the conventional sense, the project is not in the flood plain. Further, the project is designed in such a way, that it is waterproof if it were topped with water. While in the past SWFWMD may have had concerns that the project might cause downstream flooding, SWFWMD currently has no such concerns, given the run-of-the-river status of the proposed project. The operation of the project will not cause downstream flooding. The DEP included in its intent to issue, conditions contained in the sublease between Hy Power and the DEP in order to ensure that the facility would remain run-of-the-river, would comply with the water control plan, and would otherwise comply with the terms of the sublease. The DEP has final control over water flow and can revoke the permit or otherwise take enforcement action against Hy Power if Hy Power fails to comply with the water control plan. GROUNDWATER IMPACTS Operation of the project will not cause groundwater contamination or otherwise have adverse groundwater impacts. Some concerns about groundwater during excavation of the construction site were raised. The conflicting evidence received regarding them is discussed below. An area of concern was the de-watering plan for the project. Everyone agrees there will be some water seepage into the construction site that will have to be pumped out. The parties disagree regarding the amount of water that will have to be removed. Their estimates of amount of water to be removed vary because their estimates of size and over-all depth of the site vary. Petitioners presented credible evidence that a potential exists for the construction site to have a large quantity of water because of its location between two sources of surface water (the By-Pass Channel and Barge Canal), because of the makeup of the subsurface, and because of the depth of the construction. Hy Power credibly represents that if excessive groundwater is found, it can address the adverse impacts through its de-watering plan that would have to be filed with FERC and DEP. The technology exists to address the de-watering of the project. Such plans are routinely considered by DEP after a construction permit is issued and before de-watering occurs. There is very little evidence of sinkhole activity in the project area, and the construction activities are not expected to cause any sinkhole activity. NOISE POLLUTION Mr. Bitter expressed concerns that FERC would require the facility to install a very loud siren that would result in sudden noise adverse to the well-being of neighbors. Mr. Bitter is unfamiliar with FERC siren requirements at run-of the-river hydroelectric facilities. In contrast, Mr. Volkin, who has substantial experience in this area, testified that the only alarm device that would be required would be for the protection of the workers during construction. The purpose of the alarm is to warn persons below a dam spillway of a change in the volume of water being let out of the impoundment. In the case of a run-of-the-river facility, the volume is near constant, changing only gradually. Therefore, even if a warning siren had to be installed its use would be limited to significant changes in flow or testing. This would not constitute a nuisance. Further, the facility is located in the vicinity of the Crystal River Nuclear Power Plant which has its own warning sirens. It would be prudent to make any warning devices required for this structure significantly different from those at the nuclear plant and to limit their use. DAM SAFETY AND FERC REVIEW In reviewing whether Hy Power’s applications complied with the relevant permitting criteria, the DEP took into consideration the review of the facility already performed by FERC. FERC will also be responsible for reviewing the project as it is being constructed. Mr. Edwards also raised concerns about the structural stability of the By-Pass Dam itself. This has been a subject of concern by those responsible for the dam, and a survey of the structure was conducted in 1993, referred to as the Greiner Report. The Greiner Report identified specific maintenance problems that have been and are being addressed by the DEP. However, DEP’s maintenance plan does not address specifically the possibility that the weight of the dam over time has caused some shifting in the dam. Hy Power has only a few core borings and only one at the location of the generator. Hy Power is using the ACOE’s original borings, as confirmed by several new ones, to develop its preliminary plans. The DEP considered FERC and the ACOE as responsible agencies for determining the structural integrity of the dam. DEP has taken FERC’s review of this facility into consideration as part of DEP’s own permitting review. It is normal for DEP to rely on outside sources and agencies for assistance in determining compliance with DEP permitting criteria such as public health and safety, and it is reasonable for DEP to do so in this instance. Most states do not have the full capability to evaluate dam safety, and so they rely on FERC and ACOE. On April 21, 1997, the project received a conduit exemption from FERC. The application process is illustrated in Hy Power Exhibit 11. Hy Power submitted to DEP detailed information about the dam, the associated structures and the proposed project which had been reviewed by FERC and the ACOE, the two agencies in the United States who are responsible for dam structure design, control, and administration. Included in the package was the Greiner Report and Hy Power’s review of it. FERC evaluated the project, the Inglis By-Pass Dam structure, and the proximity of the project to the Dam in relation to structural impact, upstream and downstream impacts, water quality, and environmental issues. Mr. Edwards raised concerns regarding the ability of the limestone bedrock to sustain additional construction in the area of proposed construction. This is a material issue in the controversy which impacts several aspects of the proposed construction. Mr. Edwards pointed out that the barge canal channel was constructed with the use of explosives that caused a fracturing of limestone bedrock. He pointed out that the steel panels, which Hy Power proposes to drive into the bedrock to construct the water retention structure necessary to excavate the hole into which the turbine and powerhouse would be placed, will further fracture this bedrock. This creates two potential dangers. It could permit water to move under and around the bottoms of the panels, potentially scouring the loosened material from the base of the panels and making them unstable and subject to failure. It could weaken the entire southern wing of the existing spillway dam. Mr. Edwards opined that this could result in catastrophic failure of the dam or the coffer dam. Such a failure would cause major destruction and loss of life to those persons living and working in and along the lower Withlacoochee River. Hy Power presented rebuttal evidence that it could and would, if necessary, inject concrete into the limestone to stabilize it and avoid the concerns raised by Mr. Edwards. FERC specifically evaluated concerns raised by project opponents over the poor physical condition of the By-Pass Channel Spillway structures, relying particularly on the 1993 Greiner Report. FERC noted that the DEP had entered into a contract to correct any deficiencies listed in the Greiner Report, which "did not conclude that the deficiencies at the By-Pass Spillway threaten downstream life and property." The FERC review concluded that the dam was safe. To ensure safety, FERC is requiring that Hy Power do a complete stability analysis of the dam prior to any construction. Articles 301 and 302 of the FERC exemption ensure that all final drawings and specifications be submitted to FERC prior to construction, along with a supporting design report consistent with FERC’s Engineering Guidelines; that FERC can require changes to assure a safe and adequate project; and that Hy Power must also submit approved coffer dam construction drawings and specifications at least 30 days prior to starting construction. FERC has its own engineering staff who will go to the site and do their own analysis, along with the ACOE, of the dam and structures, prior to any construction commencing. This is a detailed design review evaluation so that the latest information on the dam will be made known immediately prior to construction, and will prevent any catastrophic event from happening. Under FERC procedures, FERC requires the applicant to obtain the DEP permits prior to requiring applicant to submit more detailed construction designs for FERC's consideration. These more detailed designs in turn will be subject to further review by DEP and FERC. It is assumed that Hy Power will comply with the post- permitting procedures and requirements, and will present complete, detailed construction drawings for FREC and DEP approval. Hy Power’s failure to complete the process would result in denial of a construction permit.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the DEP enter a Final Order that issues the two permits challenged in this proceedings, WRM Permit No. 38-237096-3.001 and MSSW Permit No. 38-0129249-002, subject to the conditions contained in the Intents to Issue in the respective WRM and MSSW Permits and as described in the Recommended Order. DONE AND ENTERED this 2nd day of March, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2000. COPIES FURNISHED: Daniel H. Thompson, Esquire Berger Davis & Singerman 215 South Monroe Street, Suite 705 Tallahassee, Florida 32301 Andrew Zodrow, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John S. Clardy, III, Esquire Crider Law Firm Plantation Point 521 West Fort Island Trail, Suite A Crystal River, Florida 34429 Teri Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bernard M. Campbell Bessie H. Campbell 245 Palm Street Post Office Box 159 Inglis, Florida 34449 Sarah E. Berger Post Office Box 83 Inglis, Florida 34449
The Issue The issues for determination in this case are: 1) whether the Department of Environmental Protection (DEP) has dredge and fill permitting jurisdiction over a certain body of water known as Lake Blake in Okaloosa County, Florida; 2) if DEP's dredge and fill permitting jurisdiction is established, whether Respondents qualify for an exemption from DEP's dredge and fill permitting jurisdiction; and 3) if not otherwise exempt from DEP's dredge and fill permitting jurisdiction, whether Respondents are guilty of the violations alleged in the Notice of Violation and Orders for Corrective Action issued by the Director of District Management for the Office of the DEP Northwest District on May 13, 2003.
Findings Of Fact Parties The Department of Environmental Protection (DEP) is the agency of the State of Florida vested with the power and duty to enforce the provisions of Chapters 373 and 403, Florida Statutes, and the rules promulgated in Chapter 62, Florida Administrative Code. DEP is the only agency involved in these proceedings. Respondent, Santa Rosa Three, Inc. (the Corporation), is the fee simple title holder of certain property in unincorporated Okaloosa County, Florida, located between Lewis Street and Clifford Street in Sections 2 and 3, Township 2 South, Range West. The property includes the subject water body, Lake Blake. Santa Rosa II, Inc., is a corporate predecessor in interest to the Corporation. Respondent, Lee Maddan (Maddan), is a long-time resident of Okaloosa County. Maddan is the Petitioner in DOAH Case No. 03-1499. Maddan has personally observed activities occurring at the Lake Blake property for more than 38 years, including the excavation of the lake. Maddan holds equitable title to the Lake Blake property and is in the process of purchasing the fee simple title to the property from the Corporation. Maddan is and was at all material times hereto authorized by the Corporation to enter upon the Lake Blake property, to proceed to develop the land, to obtain permits in his name, and to do other acts to prepare the property for Maddan's purchase. History of Lake Blake Lake Blake is an artificially-created water body in unincorporated Okaloosa County, having a water surface area slightly less than six acres. There is a small island in the center of the lake. The property surrounding Lake Blake presently consists of both uplands and wetlands. No other water body is visible from Lake Blake. For DEP jurisdictional determination purposes, Lake Blake is located in the Northwest District of Florida. The oldest records of the Lake Blake property dating to 1826, indicate that the property was flat land with natural vegetation dominated by palmetto and galberry. The property historically had no flowing streams. In the 1950's, the then owner of the property began excavating a borrow pit on the property. The excavations continued until approximately 1979. As the borrow pit excavations continued, a lake formed due to the intrusion of underground water as well as collected rainfall. During the excavation period, and until approximately 1976, the land around the borrow pit was primarily pasture land with no trees or other vegetation. Up to 1976, there was no wetland vegetation growing on the property. Prior to 1960, the natural stormwater flow from the property was to the southwest toward Cinco Bayou, a defined water of the State of Florida which on a direct line is located approximately one-quarter mile from the property. Cinco Bayou is the nearest surface waters of the State of Florida. During the 1960's, a road known as Lewis Street (also known as Mayflower Avenue) was constructed along the southern boundary of the property. At the time of the construction of Lewis Street, the borrow pit was separated into two parts, an eastern and western section. A concrete culvert divided the sections of the borrow pit. At the time of the Lewis Street construction, a stormwater discharge pipe was installed by Okaloosa County and excess water flowed out of the borrow pit only at certain times in direct response to rainfall. The installation of the stormwater discharge pipe on Lewis Street was intended to drain excess rainfall from the borrow pit. Okaloosa County never acquired ownership of the borrow pit for use as a stormwater retention pond. The water body that formed in the borrow pit would come to be called Lewis Street Pond, or Blake Lake, and eventually Lake Blake. The natural flow of the stormwater from the property was further altered in the 1970's when a public elementary school was constructed by Okaloosa County on Lewis Street. The public school is located between the property and Cinco Bayou. Borrow pit operations formally ceased in September of 1980 when DEP's predecessor agency, the Department of Environmental Regulation (DER), entered an order requiring the cessation of mining operations. The physical operations had actually ceased a few years before the DER order. Lake Blake resulted from collected rainfall, as well as underground water intrusion in the original borrow pit. At the present time, additional diverted stormwater runoff collects in the lake as a result of Okaloosa County's stormwater drainage system. Lake Blake today is an artificial body of water owned entirely by one person. Residential housing is located on property surrounding Lake Blake. The lake is occasionally utilized for recreational purposes, including fishing. The property surrounding the lake is not open to the general public, and the entrances to the property are fenced. For purposes of this proceeding, there are no threatened or endangered plants on the property. Okaloosa County Stormwater Drainage System Okaloosa County has constructed a stormwater drainage system that runs through the Lake Blake drainage area. As part of this stormwater drainage system, Lake Blake collects diverted stormwater discharge from surrounding areas which have been previously developed. Residential neighborhoods are close to the area, specifically the Berkshire Woods Subdivision. Indeed, as a condition for the development of the Berkshire Woods Subdivision in 1976, the Okaloosa County Planning Commission required that former owner, Ron Blake, excavate the lake and make it ready for stormwater drainage from the proposed development of the Berkshire Woods Subdivision. In addition to the residential areas and the public school to the south, there is a private school to the north across the road on Clifford Street which also diverts water to the lake from its campus and parking lots. Okaloosa County has installed at least seven pipes which carry stormwater from the surrounding developed areas into Lake Blake. The only drainage out of Lake Blake is via the stormwater discharge pipe located at the southern boundary of the property on Lewis Street which was installed by Okaloosa County in the 1960's. Okaloosa County's stormwater discharge system serving Lake Blake is integrated into a series of interconnecting underground stormwater pipes which route the flow of the water for approximately one-half mile before ultimately discharging water into Cinco Bayou. Okaloosa County's stormwater discharge system which ultimately connects Lake Blake with Cinco Bayou is composed of buried pipes. DEP considers buried pipes or culverts which convey stormwater as excavated water bodies. The installation of Okaloosa County's stormwater discharge system required the excavation of land. Under DEP's interpretation of its rules, specifically Rule 62-312.030(2), Florida Administrative Code, the underground installation of stormwater pipes is sufficient to establish a series of excavated water bodies which connect Lake Blake to Cinco Bayou. Prior to the installation of Okaloosa County's stormwater discharge pipe on Lewis Street in the 1960's, there was no dredge and fill permitting jurisdiction which applied to the property containing Lake Blake. The stormwater discharge pipe has continuously existed on the southern boundary of the property since its installation in the 1960's to the present. Lake Blake was not originally designed, constructed nor permitted as a stormwater treatment or retention pond. Lake Blake incidentally resulted from the borrow pit excavations. Okaloosa County, however, has at least since 1976, utilized Lake Blake as part of its stormwater drainage system. Okaloosa County never acquired title to Lake Blake for use as part of its existing stormwater drainage system. In 1981, the Okaloosa County Board of Commissioners (who were not the owners of the property) applied for, and were issued by DER, a Construction Permit (No. RC-46-80-2031, dated May 27, 1981, which expired November 27, 1981) for "Blake Lake Modifications" which permit stated it was "to modify an existing stormwater drainage system." This permit allowed for, among other items, construction of "two earthen berms in Blake Lake" and "the diversion of lake flow from the western lake to the eastern lake." Although attempts were made to construct the two earthen berms, due to the white clay composition of the soil the berms were not successfully established. In 1984, DER issued another Construction Permit (No. 460853421 dated August 20, 1984, which expired August 15, 1987) to the Okaloosa County Board of Commissioners (who again were not the owners of the property) for the purpose constructing "two drainage channels . . . from a berm separating East and West Blake Lake." The drainage channels were thereafter completed and the east and west portions of the lake were eventually connected. On August 14, 1984, Okaloosa County also filed a Notice of New Stormwater Discharge with DER which proposed a re-routing of an existing stormwater drainage system which then diverted stormwater from the Candlewood Subdivision and Navy Street into Lake Blake. The stated purpose of the re-routing of the stormwater drainage system away from Lake Blake was to address flooding problems in the Candlewood Subdivision. By letter dated August 21, 1984, DER informed Okaloosa County that "the stormwater discharge is exempt from stormwater permitting requirements of the Department pursuant to Florida Administrative Code Rule 17-25.03(2)(c)." DER came to this conclusion in 1984 because the proposed project was "the modification of an existing County stormwater management system not serving a new development or increasing pollution loading." Although Lake Blake was utilized by Okaloosa County as part of the existing Okaloosa County stormwater drainage system, which in 1984 qualified for a DER stormwater permitting exemption, nothing pertaining to this stormwater permitting exemption supports a finding that Lake Blake was originally constructed, permitted or designed solely for the purpose of stormwater treatment so as to qualify for an exemption from DEP's dredge and fill jurisdiction under Rule 62-312.050(4), Florida Administrative Code. Dredge and Fill Permitting Jurisdiction Prior to the installation of Okaloosa County's stormwater discharge pipes on the property in the 1960's, there was no dredge and fill permitting jurisdiction which applied to the property and Lake Blake. Under current law, the Northwest District of Florida is governed by separate jurisdictional determination provisions. In order to initially establish DEP's dredge and fill permitting jurisdiction over wetlands and surface waters in the Northwest District, DEP must demonstrate that the wetlands and surface waters are connected to the surface waters of the State. Since 1995, isolated wetlands in all of the rest of the State of Florida are regulated by DEP without regard to any connection to the surface waters of the State. In the Northwest District under Rule 62-312.030(2), Florida Administrative Code, "surface waters of the state are those waters listed below and excavated water bodies, except for those exempted by Section 62-312.050(4), F.A.C., which connect directly or via an excavated water body or series of excavated water bodies . . ." to waters of the State. Under Rule 62- 312.045, Florida Administrative Code, however, "[i]solated wetlands that infrequently flow or otherwise exchange water with a described water body are not intended to be included within the dredge and fill jurisdiction of the Department." By letter dated April 24, 2001, DEP advised Santa Rosa II, Inc., that the Lake Blake property was not subject to DEP's dredge and fill jurisdiction. The letter was sent in response to an application seeking to fill 2.5 acres of the southeastern portion of the lake for the construction of an apartment complex. The letter was issued by DEP's Northwest District, and signed by Martin Gawronski on behalf of Larry O'Donnell, the Environmental Manager for Permitting Section of the Northwest District. The letter was issued after a visit to the property by one or more DEP employees, and based on an informal determination that Lake Blake was not connected to the waters of the State. In May of 2001, the United States Army Corps of Engineers determined that the Lake Blake property was not within its jurisdiction. Subsequent to the issuance of the April 24, 2001, non- jurisdictional letter, certain employees of Okaloosa County (not specifically named in these proceedings) contacted DEP seeking reconsideration of DEP's decision. These Okaloosa County employees thereafter met with DEP employees at the property and communicated by telephone with DEP employees while DEP considered a re-determination of its non-jurisdictional decision. The property owners were then notified that DEP was in the process of re-evaluating its non-jurisdictional decision. By letter dated October 24, 2001, DEP advised Santa Rosa II, Inc., that DEP had made a "correction" to the letter of April 24, 2001, and had determined that the property was in fact subject to DEP's dredge and fill permitting jurisdiction, because the "pond" was "connected to jurisdictional waters" of the State. The October 24, 2001, letter, like the previous letter, was issued from DEP's Northwest District and signed by Martin Gawronski on behalf of Larry O'Donnell. Between April 24, 2001, and October 24, 2001, there were no man-made alterations made to the Lake Blake property. Between March and April 2002, Maddan filled in a portion of the property and the lacustrine wetland. Maddan also built two pedestrian footbridges over the lake to the small island in the middle of the lake. DEP asserted its dredge and fill permitting jurisdiction based upon the existence of a series of underground pipes installed by Okaloosa County as part of its stormwater drainage system that conveys excess stormwater from Lake Blake to Cinco Bayou. Installation of the underground pipes required excavation. Neither the April 24, 2001, letter, nor the subsequent October 24, 2001 letter issued by the Northwest District, is binding determination of DEP's dredge and fill permitting jurisdiction over the wetlands and surface waters of Lake Blake. The authority to make a binding DEP dredge and fill permitting jurisdictional determination is vested in Dr. John Tobe, Environmental Administrator of the Wetland Evaluation and Delineation Section and his staff. DEP's Site Inspections/Jurisdictional Determination In April of 2002, Stacy Owens, DEP Environmental Specialist, received a telephone call from Chuck Bonta with the Okaloosa County Code Enforcement Department, and an unnamed homeowner, complaining that Lee Maddan had built two unpermitted pedestrian footbridges at Lake Blake and was also filling in part of Lake Blake. Ms. Owens initially investigated whether DEP had issued any permits for the placement of fill in Lake Blake or the surrounding wetlands, and determined that no permits had been issued. Ms. Owens further discovered that a prior Notice of Violation and Orders for Corrective Action had been issued by DER in 1980 against the Okaloosa County Board of Commissioners and Lloyd D. Junger (a lessor conducting mining operations). The 1980 case pertained to the discharge of turbidities from the Lewis Street Pond into Cinco Bayou. A final order in that case was entered on January 5, 1981, requiring Okaloosa County to make payment to DER and take corrective action. On April 23, 2002, Ms. Owens followed up on these complaints by performing a site visit to Lake Blake. At this time Ms. Owens observed two unpermitted pedestrian footbridges, unpermitted fill in a finger of Lake Blake, and unpermitted fill within a 20-foot by 25-foot lacustrine wetland area. On April 25, 2002, Maddan came to Ms. Owens' office to discuss whether permits were necessary for the placement of fill at Lake Blake. At that time, Maddan showed Ms. Owens the previous letters of April 24, 2001, and October 24, 2001, which had been sent from the Northwest District of DEP. Maddan stated that in his opinion no dredge and fill permit was needed because Lake Blake was not within the jurisdiction of DEP. Ms. Owens was then informed by employees of Okaloosa County that there were underground pipes connecting Lake Blake to Cinco Bayou. She obtained from Gary Bogan of Okaloosa County, an aerial map of the drainage area for Lake Blake which identified the location of the culvert on Lewis Street which conveys excess flow from Lake Blake to Cinco Bayou. On April 30, 2002, Ms. Owens performed another site inspection at Lake Blake. During this site inspection, she tracked the connection from Lake Blake to Cinco Bayou by personal observation. After her second site inspection, Ms. Owens e-mailed her findings to Dr. Tobe, and inquired whether the underground pipes satisfied the DEP requirements for connection to a water body of the State for the purpose of establishing DEP's dredge and fill permitting jurisdiction. Dr. Tobe replied to Ms. Owens that an underground pipe connection would satisfy DEP's dredge and fill jurisdictional requirements. On June 25, 2002, Dr. Tobe, Ms. Owens, and a DEP wetland delineation team visited the Lake Blake property for the purpose of making a jurisdictional determination. Maddan also accompanied Dr. Tobe and his team on the day of the site inspection. As a result of this inspection, Dr. Tobe completed and filed a Field Report for Lake Blake, Okaloosa County, dated June 25, 2002. As indicated in his Field Report, Dr. Tobe and his wetland delineation team determined that for jurisdictional purposes, Lake Blake was connected to the waters of the State by reason of the culvert on Lewis Street that ultimately discharges into Cinco Bayou. At the time of his inspection on June 22, 2002, Dr. Tobe did not observe water flowing from Lake Blake into the Lewis Street culvert. Dr. Tobe attributed this to an abnormal drought conditions the area was then experiencing. Maddan, who has observed this area for many years, testified that the lake was near or only slightly less than its normal water level on that date. Dr. Tobe conducted a further examination of the area to determine the ordinary high water line, and concluded that Lake Blake would at ordinary high water level flow into the Lewis Street culvert on a sufficiently regular frequency into Cinco Bayou, a water body of the State, for purposes of establishing DEP's dredge and fill jurisdiction. In determining whether water exchange frequency is sufficient to establish jurisdiction, there is a DEP Interoffice Memorandum of October 31, 1988, setting out 25-year, 24-hour criteria which is used as guidance, but the criteria set in this Memorandum have not been adopted as a rule, and are not singularly determinative of DEP's jurisdiction. At this time, Dr. Tobe and his team also performed a wetland boundary delineation. Dr. Tobe found hydric soils and wetland plants dominating the area. The wetland delineation boundary was determined by the continual interpretation of vegetation, soils, and hydrologic indicators. As a result of his inspection and wetland boundary delineation, Dr. Tobe concluded that unpermitted fill had been placed within the surface waters of the State and in lacustrine wetland. Thereafter on July 18, 2002, DEP sent Maddan a Warning Letter (DF-SO-46-022) requesting that Maddan cease dredging, filling or construction activities at Lake Blake without obtaining a permit. Subsequent to DEP's sending Maddan the Warning Letter of July 18, 2002, Stacy Owens visited the Lake Blake site on numerous occasions beginning in October of 2002, and continuing through July of 2003. On most of these site visits, Ms. Owens observed water flowing from Lake Blake through the Lewis Street culvert. Ms. Owens documented water flowing from Lake Blake through the Lewis Street culvert on October 29, 2002, November 5, 2002, May 20, 2003, June 20, 2003, June 23, 2003, June 27, 2003, and July 8, 2003. The area was not experiencing abnormally excessive rainfall events at the times that Ms. Owens documented the water flowing from Lake Blake into the Lewis Street culvert. Maddan testified that in his personal observation over many years, Lake Blake generally discharges excess stormwater into the Lewis Street culvert only as a result from a significant rainfall event. Lake Blake discharges water into the Lewis Street culvert at regular intervals. Such discharged water from Lake Blake ultimately is conveyed through the Okaloosa County stormwater drainage system and released into the surface waters of Cinco Bayou, a water body of the State of Florida. The Okaloosa County stormwater drainage system connecting Lake Blake to Cinco Bayou is a series of excavated water bodies. Lake Blake is connected to the surface waters of Cinco Bayou and regularly exchanges water with Cinco Bayou. Exemptions from DEP's Jurisdiction To assert dredge and fill permitting jurisdiction over this property, not only must Lake Blake be connected to the waters of the State, but the property must not be otherwise exempt from dredge and fill permitting jurisdiction under either statute or rule. On August 29, 2002, under the authority of the Corporation, Maddan filed a "Joint Application for Works in the Waters of Florida" with DEP requesting an exemption from DEP's dredge and fill permitting jurisdiction under Rule Chapter 17- 312, re-codified as Rule Chapter 62-312. Rule 62-312.050, Florida Administrative Code, sets out the recognized exemptions to DEP's dredge and fill permitting jurisdiction. Respondents primarily rely on Rule 62-312.050(4), Florida Administrative Code, which provides that "[n]o permit under this chapter shall be required for dredging or filling in waters which are contained in those artificially constructed stormwater treatment and conveyance systems designed solely for the purpose of stormwater treatment and that are regulated by the Department or the water management district." Lake Blake, however, is the result of excavations in a borrow pit. Because of surrounding development, Lake Blake receives stormwater runoff; however, the lake was not "designed solely for the purpose of stormwater treatment," and cannot therefore qualify for this exemption. Respondents also cite Rule 62-312.050(1)(g), Florida Administrative Code, which provides an exemption for the "construction of seawalls or riprap, including only that backfilling needed to level land behind the seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control." Even assuming that the filling of the finger of Lake Blake meets the test of construction of a seawall, there is no evidence that such filling of Lake Blake was ever subjected to appropriate water quality tests, much less meeting such water quality tests as well as the other requirements of this exemption. In addition to the exemptions established by Rule 62- 312.050, Respondents cite statutory exemptions. The definition of "waters" which are regulated under Chapter 403, as set forth in Section 403.031(13), provides in pertinent part that "[w]aters owned entirely by one person other than the state are included only in regard to possible discharge on other property or water." Although Lake Blake is owned entirely by one person, this provision does not exempt Lake Blake because of not only its "possible discharge" but because of its actual discharge on the surface waters of Cinco Bayou. Respondents also cite Section 403.812, which provides that "[t]he department shall not require dredge and fill permits for stormwater management systems where such systems are located landward of the point of connection to waters of the state and are designed, constructed operated and maintained for stormwater treatment, flood attenuation, or irrigation." Although Lake Blake at least since 1976 has been utilized as part of Okaloosa County's stormwater drainage system, which is located landward of Cinco Bayou, it was not designed or constructed for stormwater treatment, flood attenuation or irrigation, and it is not being operated or maintained for stormwater treatment, flood attenuation or irrigation. Lake Blake does not qualify for an exemption from DEP's dredge and fill permitting jurisdiction.
The Issue Whether Michael Chbat's 2008 application for a Wetland Resource Permit (WRP) to construct a culvert extension across his property in Walton County, Florida, should be approved?
Findings Of Fact La Grange Bayou Estates La Grange Bayou Estates is a residential subdivision in Freeport, Walton County, Florida. The subdivision lies to the north of the shoreline of Choctawhatchee Bay. It can be viewed as divided roughly in half between bayfront lots south of an east-west road that transects the subdivision and lots that are north of the road. The subdivision is platted and the plat is in the public records of Walton County. Filed with the Clerk of the Circuit Court in and for Walton County, Florida, on September 15, 1982, the plat ("the 1982 Plat") shows 29 residential lots in the subdivision as of that date. See Petitioner's Ex. 6. Lots 1 through 16, according to the 1982 Plat, are the bayfront lots, south of a 40-foot wide road designated as a private road in the plat. That road is now known as Alden Lane. Wetlands over which the Department has jurisdiction ("jurisdictional wetlands") comprise much of the southern portion of bayfront lots and the drainage easement. Among the bayfront lots are both Lot 9 which belongs to Mr. Chbat and Lot 8 which belongs to Mr. Sheehey. A 50-foot easement lies between Lot 9 and Lot 8 and is described more fully below. The presence of jurisdictional wetlands on Mr. Chbat's lot over which he hopes to install the culvert extension requires that he obtain a WRP. To the north of Alden Lane are lots numbered by the 1982 Plat as 17 through 29. The lots are served by Alden Lane and, in what is roughly the northeast quadrant of the subdivision, by two other roads. One of the roads is shown on the 1982 Plat as a "40' PRIVATE ROAD." Id. A 2006 aerial photograph introduced into evidence by Chbat designates the road "unnamed." See Chbat Ex. 5. The other is designated as a "graded county road," on the 1982 Plat. By 2006, it had come to be known as Beatrice Point Road. Id. Beatrice Point Road transects a pond that runs roughly 340 feet (excluding about 30 feet of roadway) in a northeasterly direction from Alden Lane to the southern edge of an area north of the subdivision shown on the 1982 Plat to be un-platted. The pond is most likely the result of a "borrow pit" dug in order to obtain fill for the construction of the roads when the subdivision was initially developed. The southern boundary of the pond lies along approximately 140 feet of Alden Lane's northern edge. The pond is across the street from Lots 9, 10 and 11 of the subdivision. The pond is also not far northeast of the 50-foot easement (the "Drainage Easement") between Lots 9 and 8. The Drainage Easement The Drainage Easement is just to the west of Lot 9. It is noted on the 1982 Plat as a "50' EASEMENT (PRIVATE)." Id. The 50-foot wide Drainage Easement runs the length of the western boundary of Lot 9 and the length of the eastern boundary of Lot 8. The northeast corner of the Drainage Easement is approximately 30 feet from the southwest corner of the pond separated from the pond by the roadway of Alden Lane. The eastern boundary of the Drainage Easement is 226.37 feet in length, or if taken to the middle of Alden Lane, 246.3 feet. The western boundary is 206.13 feet long or if taken to the middle of the road, 226.65 feet. The purpose of the Drainage Easement, as is evident from its denomination in this recommended order, is drainage. As Mr. Street definitively put it at hearing, it is "now and always has been intended to drain stormwater to the [B]ay." Tr. Vol. III at 179. Mr. Street's opinion of the function of the Drainage Easement is supported by drawings submitted by Mr. Chbat as part of the WRP application. The drawings show that the Drainage Easement's function is facilitated by three culverts north of the Easement (referred to during the hearing as "pipes") each of which is intended to direct stormwater at its point of discharge toward the Drainage Easement. See Chbat Ex. 1. One of the culverts ("the Drainage Ditch Culvert") serves a drainage ditch that is to the north of the Easement and Alden Lane. According to the drawings, the drainage ditch lies on the other side of the "un-named road" from the pond, that is, to the west of the pond, and is some 40-to-50 feet north of the Drainage Easement. The Drainage Ditch Culvert extends from the ditch to the southern half of Alden Lane from where it appears from the application's drawings that stormwater would be conveyed to the western side of the Drainage Easement along it's border with Lot 8 and on toward the Bay. In fact, it is a functioning culvert that "conveys water from a swale on the side of the road into the [D]rainage [E]asement." Tr. 64. Once in the Drainage Easement, according to the drawings, the water should flow into the Bay out of a "cut," id., that is labeled on the drawings as an "existing trench." See Chbat Ex. 1. The trench, however, has been filled in with sand by tidal activity or sediment deposited by stormwater or both. The trench has not been maintained, and it no longer exists. The other two culverts (the "Pond Culverts") lie east of the Drainage Ditch Culvert. They catch overflow from the pond caused by stormwater and convey it under and through Alden Lane toward the Drainage Easement. The westernmost Pond Culvert (the "Western Pond Culvert") appears to terminate in Alden Lane near its southern edge just north of the Easement. At the time of hearing, however, it was not functioning properly. "[I]t is full of sand and silted up . . .", tr. Vol. I at 58; "[t]he pipe to the west is clogged and it is not functioning." Tr. Vol. I at 64. It is also at an elevation that would keep it from serving drainage purposes in all but the most severe storm events. See Chbat Ex. 9 at 22. The other Pond Culvert, (the "Eastern Pond Culvert") terminates in the northwest corner of Lot 9 at the border between Lot 9 and the Drainage Easement about 10 feet southeast of the terminus of the Western Pond Culvert. The Eastern Pond Culvert is the culvert with which the Amended Permit is concerned, that is, it is the culvert to be extended by the permit. Calling it a "pipe," Mr. Street offered the following about the assistance the Eastern Pond Culvert offers in conveying stormwater into the Drainage Easement and down to the Bay: There is currently a pipe that discharges into that easement. There . . . was an attempt to place the water from the . . . pond into the easement. And the natural flow of water on this entire property from the road to the [B]ay is north to south. At some point, at least 2004, that drainage easement contained a conveyance at its southern end that would safely discharge stormwater to the [B]ay. Tr. Vol. III at 179-80. Petitioner Sheehey and Lot 8 Thomas Sheehey is the owner of Lot 8, where he has a residence in which he makes his home. He has lived in the residence approximately five years. During that time, Mr. Sheehey has fished in the Bay and enjoyed the use of his kayak and his waverunner on the Bay. He also enjoys "sitting down having a cup of coffee and looking at it," tr. vol. III at 151, as well as watching his neighbors fish. The recreational uses to which he puts the Bay is the reason he chose to purchase a bayfront lot in La Grange Bayou Estates. Over the period of time that he has resided on Lot 8, Mr. Sheehey has observed the effects of rain events on his lot and well as lots close to Lot 8. He has also taken pictures of his property and the near-by lots. Among the photographs were four taken after rain events or "after a wet period," tr. vol. III at 88, at some point in the last four years. The four photos were introduced as a composite exhibit, Petitioner's Ex. 2, with each photograph marked as 2A, 2B, 2C or 2D. Mr. Sheehey could not specify when the pictures were taken in the past four years other than that if a picture had a certain dock in it, then it was taken after January of 2009. Petitioner's Ex. 2A was taken from Mr. Sheehey's lot looking toward the Bay. It shows an area of the lot under water separated from the Bay by a ridge. Petitioner's Ex. 2B is a picture taken from Lot 13 looking west across Lots 12, 11, 10, 9 "down through 8." Tr. Vol. III at 86. Much of what is photographed is among trees and vegetation emerging from water standing above the surface of the soil. Petitioner's Ex. 2C is a picture taken from Alden Lane looking south across Mr. Chbat's property. It shows a wide swath of water that extends from the road across most of the property to the Bay. The water is either in a swale or constitutes overflow outside the swale. The most recent of the four is Petitioner's Ex. 2D, which shows the dock referred to by Mr. Sheehey that was built in early 2009. It is a picture taken from Lot number 13 toward the west through Lots 12, 11, 10, 9. Like the others, it shows vegetation standing in water to the north of the Bay. Taken together, the four pictures in Petitioner's Exhibit 2 demonstrate that significant portions of the lots depicted are under water following sufficient amounts of recent rain. The four photographs that comprise Petitioner's Exhibit 2 are not the only photos taken by Mr. Sheehey that were introduced into evidence. Three other photographs of Mr. Sheehey's, Petitioner's Exhibits 7A, 7B and 7C, were admitted following testimony about them from a long-time observer of the flow of water from Alden Lane to the Bay. A Long-time Observer Thomas Eugene Cummins had lived in La Grange Estates "[t]wo months shy of 20 years," tr. vol. III at 7, at the time of his testimony. His house was the fourth to be constructed in the subdivision. Over the two decades of his residence, the pond between Alden Lane and the property north of the subdivision has been in existence. Consistent with the drawings submitted to DEP as part of the application, when asked where the pond overflows today, Mr. Cummins answered "it drains under Alden Lane on to Mr. Chbat's lot." Tr. Vol. III at 8. Asked by Mr. Chesser at hearing, "When the water comes out of the pond, is it possible to know where it spreads?"1/ Mr. Cummins testified: On really heavy rains, I have watched the normal color of the pond change from its dark blackish gray color into the reddish color that the clay has washed down into it, flow under Alden Lane and on to Mr. Chbat's lot, and then proceed west through the wetland on lots eight, seven, six, and my five, and turn reddish color even in my lot. Tr. Vol. III at 9-10. Mr. Cummins knew the source of the "red color" of the stormwater: red clay introduced to La Grange Estates by the County half a decade earlier. Mr. Cummins testified: Beatrice Point Road, which is the road that runs over the pond, about five years ago the county did some repair on the road and actually put red clay in certain spots to even it out. Tr. Vol. III at 9. Prior to the county's work on the road referred-to by Mr. Cummins, there had been no red clay in the neighborhood. Alden Way, for example, has no red clay. It is a road composed of shell. The only red clay in the subdivision is that which is on Beatrice Point Road. The water that runs onto Mr. Cummins' lot following a heavy rain rises to as much as 12 inches.2/ The water rises as high as it does because it is held back by a naturally-occurring land formation between the Bay and Mr. Cummins property. This geo-formation was referred-to at hearing as the ridge line or the ridge. The Ridge The Ridge was described by Mr. Cummins as a vegetated mass of earth that most of the time, even in heavy rains, sits above the water that collects on the bayfront lots of La Grange Estates. The Ridge prevents a substantial amount of stormwater runoff from entering the Bay from the wetlands on the southern portion of the subdivision's bayfront lots. For that reason, the ridge is called "our upland,3/" tr. vol. III at 13, according to Mr. Cummins. Between Lot 9 and Lot 5, the ridge varies in width "anywhere between 10 feet . . . up toward Mr. Chbat's lot, down to [Mr. Cummins'] lot where its around 30 or 40 feet [wide.]" Id. (It may extend, in fact, across all of the bayfront lots.) The ridge meanders not far from the shoreline. Id. In some places it is as narrow as five feet. The height of the ridge varies as well from as low as one foot to as high as two and half feet. Mr. Street also testified about the Ridge, referring to it in his testimony as a "ridge line": Now, there is a ridge line, and there's been a lot of testimony about this ridge line, that it exists across all of the lots. My testimony was, essentially, related to the review that I did, which was primarily associated with lots eight and nine, and the drainage easement between them. And from what I can tell, the elevation of that ridge line is give or take three. Elevation three, not a height of three. An elevation of three. It could be lower, and perhaps, is higher. And its subject to the vagaries of a number of factors, flow of stormwater, wave action, tidal influence, and the like. And these accretions and depositions of sand over time change that ridge line. And sometimes, it opens up. And sometimes it may not have a natural opening, depending on where you are along that entire stretch of beach. * * * [T]o the extent there is an opening in that ridge line, water will flow naturally to the bay. Tr. Vol. III at 180-181. An "east west flow of water," tr. vol. III at 181, along the bayfront lots, that is, a flow of water either in an easterly direction or a westerly one is contrary to the flow from Alden Lane north of the lots to the Bay south of the lots. Whether flowing east or west, the water in the southern portions of the bayfront lots is "controlled by the ridge line." Id. In other words, stormwater that flows from north to south across the bayfront lots, including Mr. Chbat's and the Drainage Easement, is going to collect and begin to flow from east to west or west to east at some point north of the Ridge before it drains into the Bay. The only exception to east-west flow, as made clear by Mr. Street, is when and if there is an opening in the Ridge that allows the water otherwise held back by the Ridge to flow southward into the Bay. The east-west flow of the water along the Ridge was described at hearing as "unnatural." Id. In fact, it is not un-natural. The Ridge is the cause of the east-west flow and, as Mr. Street testified, the Ridge is the result of natural processes such as tidal influence, wave action, accretion and deposition of sand.4/ The Ridge is shown in Petitioner's Exhibit 7A,5/ another photograph taken by Mr. Sheehey. The ridge as shown in the picture is well vegetated and above water to its north and higher than the Bay to its south. It is quite clear that if there is no opening in the ridge to the Bay, stormwater north of the ridge is forced to flow in east-west directions and is prevented from flowing into the Bay. Petitioners' Exhibit 7B is a photograph of the southern terminus of a swale (see paragraphs 40 - 49, below) on Mr. Chbat's property. It shows the swale cut through the Ridge. Water, however, does not appear to be running from the end of the swale into the bay. It appears that the end of the swale is a few feet from the Bay separated by a narrow sandy area on the shore. Nonetheless, the photograph shows that there is potential for stormwater to flow from the swale when the swale has more water in it. Petitioner's Exhibit 7C is a picture of the pond6/ across the street from Mr. Chbat's Lot 9. Mr. Chbat and Lot 9 Michael Chbat is the owner of Lot 9. He purchased the lot "[t]o build a house on it." Tr. Vol. I at 22. Because he has family close by (in Fort Walton Beach), Mr. Chbat expects to use a house built on the lot for weekend visits. His ultimate aspiration is to live in a house on Lot 9 after he retires from his position as a construction engineer with the City of Tallahassee. At hearing, Mr. Chbat described Lot 9 on the day he bought it: "the lot was overgrown. It drained from north to south. It had water standing on it. And it had a pipe [the Eastern Pond Culvert] on the northwest corner discharging." Tr. Vol. I at 23. He also described the state of the lot at the time of hearing. The Eastern Pond Culvert on the northwest corner was still there. The lot had been cleared to some extent to rid it of invasive species. Overgrown vegetation was trimmed or cleared to make room for a driveway permitted by the Department and "a parking pad in the front area of it, as well as an access pad in the uplands." Id. A dock had also been constructed from the property into the Bay. The most significant difference between the lot at the time of purchase and the lot at the time of hearing for purposes of this proceeding is that the lot now has a swale (the Swale) that runs from the point of discharge of the Eastern Pond Culvert "all of the way to the bay area." Id. The Swale The Swale was put in sometime after March 20, 2007, as the result of a Settlement Agreement fully executed on that date "By and Between Michael Chbat and Thomas L. Sheehey." Petitioner's Ex. 10. The Settlement Agreement followed events that commenced in 2004 when Mr. Chbat filed an application (the "2004 Application") with DEP for a WRP primarily to construct a house and a boardwalk leading from the house on Lot 9 to a dock in the Bay. The 2004 Application also proposed the extension of the Eastern Pond Culvert with a "pipe" along the western boundary of Chbat's property in a manner substantially similar to the culvert extension allowed by the Amended Permit that is the subject of this proceeding. On October 28, 2005, DEP proposed that the 2004 Application be granted. The permit (the "Proposed Original Permit") was assigned No. 66-0235320-001-DF. See Petitioner's Ex. 10, at 2. The Proposed Original Permit was challenged by Mr. Sheehey when he "filed a Petition for Administrative Hearing contesting certain action authorized under the [Proposed Original] Permit . . . specifically the relocation of a drainage pipe . . . ." Petitioner's Ex. 10, at 2. After referral of the petition to DOAH, Mr. Chbat and Mr. Sheehey wrote in the Settlement Agreement that they had "determined that it is in their best interests to settle this matter amicably pursuant to the terms hereafter". Id. Among the terms is that Chbat would file an Amended Application. See id. The agreed-to amendment to the 2004 Application was attached to the Settlement Agreement as Exhibit "A," a drawing of a "Drainage Swale Plan," produced by Genesis Group for Mr. Chbat. The drawing depicts a swale that runs from the discharge point of the Eastern Pond Culvert nearly the full length of the western boundary of Lot 9 to the Bay. See Exhibit "A" to Petitioner's Ex. 10. The Swale was designed to take the place of the 2004 Application's proposal for a "pipe"7/ attached to the point of the discharge from the Eastern Pond Culvert. The Settlement Agreement received the support of DEP because the Department believed that a swale would assist in improving the quality of the stormwater discharged to the Bay over the untreated discharge from the end of the "pipe." Pursuant to the terms of the Settlement Agreement the 2004 Application was amended. The Department amended the Proposed Original Permit accordingly and final agency action was taken with the issuance of a permit to Mr. Chbat (the "Final Original Permit") found in DEP Permit File No. 66-0235320-001- DF. Installation of the Swale The Swale was installed, but it did not work as intended. The result of the Swale's installation was more water on the lot rather than less. Mr. Chbat described the after-effects of the Swale: "it started bringing more water to the lot . . .". Tr. Vol. I at 31. The increased amount of water is the result of several factors, one of which is tidal influence: the tide from the Bay pushes water into the Swale. "[A]bout halfway on the swale . . . that water from the bay was meeting the water from the pipe . . .". Id. The water from the Bay tide and the stormwater conveyed by the Swale would meet at "about the middle of the span of the swale." Id. The result was "a lot more water," id., on the lot. Mr. Thomason confirmed Mr. Chbat's assessment that the reason the Swale did not function as effectively as necessary is tidal flow onto Lot 9 from the Bay particularly from high winds. But tidal flow onto Lot 9 and the interruption in the discharge of stormwater through the Swale are not the only problems. There is also a maintenance factor that accompanies tidal flow: sand deposition. Mr. Thomason elaborated: "[D]uring storm events or [just normal] wave action in the bay, sand is brought back up on to . . . the sandy area at the end of [Lot 9] next to the [Bay.]"8/ Tr. Vol. I at 62. The influx of sand onto Lot 9 is not just a problem for adequate functioning of the Swale. The Drainage Easement has "the same problem." Id. Both the Swale and the Drainage Easement are plagued by deposition of sand pushed landward by normal tidal influences and storm events. Maintenance of the Swale and the Drainage Easement, therefore, would assist the drainage of stormwater into the Bay. The tidal influence and maintenance issues that Mr. Chbat encountered with the Swale led him to apply for a different and new permit. That application was filed in 2008. The 2008 Application Mr. Chbat filed a "Joint Application for Works in the Waters of Florida" with DEP on August 1, 2008 (the "2008 Application"). See Chbat Exhibit 1. The work to be approved was similar to the work originally proposed in the 2004 Application in that both applications proposed installation of a "pipe" to be fixed to the discharge point of the Eastern Pond Culvert that would run along the western boundary of Lot 9 toward the Bay. A description of the work is contained in Section 10 of the 2008 Application: "Extension of an existing stormwater pipe within a private lot approximately 150 feet. The slope for the proposed pipe extension will be at minimum so that stormwater will be treated further, and minimizing erosion." Chbat Ex. 1 at 3. After the filing of the 2008 Application, Mr. Chbat learned that Mr. Sheehey objected to the newest Chbat proposal because he believed 150 feet is not lengthy enough to clear the Ridge. See Chbat Exhibit 2. In order to cure the objection, Mr. Chbat proposed a modification to the 2008 Application. He attached a "sealed and signed drawing," id., to a letter dated September 18, 2008, that he submitted to DEP. The drawing shows the extension to be 177 feet, 27 feet more than initially proposed by the 2008 Application. The additional 27 feet was intended to ensure that the discharge would be directly into the Bay in order to "eliminate any possible run-off impact to adjacent properties." Id. The modification was accepted by DEP." See exhibit number 19/ attached to the Amended Permit, Chbat Exhibit 4. There was conflicting evidence in the proceeding on whether the outfall from a culvert extension of 177 feet will be bayward of the Ridge. The issue was put to rest by Mr. Street’s testimony in rebuttal at the hearing. See Tr. Vol. III at 194 and 203-4. His testimony establishes that the point of discharge at the end of the culvert extension will clear the Ridge so that the discharge will be directly into the Bay. The Mound The culvert extension is designed at an elevation and with cover (presumably sod). The extension runs through jurisdictional wetlands and segments them. It does not, however, isolate any portion of the wetlands. The wetlands on Mr. Chbat's property and those to the immediate east and west of it, therefore, will retain their status as jurisdictional wetlands should the extension be installed. With its sod cover, the culvert extension will be a mini-berm (or a "mound" as Mr. Street called it) at an elevation of 17 to 18 inches above grade. Water that pools to its west will no longer be able to flow eastward of the mound (except rarely under the most extreme weather events.) Conversely, water that collects to its east will no longer be able to flow westward of the extension. It would have to be a severe storm event for water to rise above the mound. Mr. Chbat has never seen water rise to 18 inches above grade and Mr. Cummins testified the highest water ever gets on his property is roughly 12 inches. The Department approved the 2008 Application as modified to lengthen the extension to 177 feet and issued the Amended Permit. But an incorrect and critical assumption was made during review of the application that related to the mound. Review of the 2008 Application During his review of the application, Mr. Street, as DEP's stormwater engineer, assumed from the drawings that the Drainage Easement is functional.10/ The assumption was expressed in Mr. Street's testimony in the Department's case-in-chief: Q [D]id you determine whether the pipe, as it would be mounded . . . [the culvert extension covered in sod] . . . would create problems for storm water flow? A I looked at that. There were two conclusions that I drew. One was that the mound would create a higher water elevation on the Chbat property east of the mound, but would not create standing water west of the mound extending into the [Drainage E]asment . . . . Which on the drawings that I reviewed showed an existing trench at the south end of that easement. And it was my opinion that any water that fell west of the mound would exit through the easement. Tr. Vol. II at 92 (emphasis added.) Mr. Street's assumption that water would not pool to the west of the mound in the Drainage Easement and toward Mr. Sheehey's property was contradicted by Mr. Sheehey's stormwater engineer, Mr. Porterfield. THe Porterfield Testimony and Support for It at Hearing The testimony at hearing of Mr. Porterfield, who conducted a site visit, established the opposite of what Mr. Street assumed. The volume of stormwater runoff that pools east of the mound, that is, water on Lot 9, will not be as great as the volume as the water that pools west of the mound. Water that would have flowed onto Lot 9 from the Eastern Pond Culvert will flow directly to the Bay via the culvert extension. The extension will also protect the Drainage Easement and Lot 8 from water that would have flowed from the Eastern Pond Culvert onto that property. But there is a significant difference between stormwater to the west of the extension and to the east. To the extension's west, the Drainage Easement and Lot 8 will have to contend with stormwater from the Drainage Ditch Culvert, the culvert north of Alden Lane that does not convey stormwater from the pond but that like the Pond Culverts has a discharge point directed at the Drainage Easement. How often and to what extent pooling of stormwater will occur west of the mound due to its presence is difficult to determine on the state of this record.11/ No studies or analyses of the likelihood and severity of storm events and the volumes of stormwater runoff that would be produced by them were conducted by any of the stormwater engineers in the case nor were any such analyses done with regard to pooling caused by the presence of the covered culvert extension. The testimony of Mr. Porterfield, however, and other evidence, demonstrates that that additional collection of water west of the mound caused by the mound will occur following heavy rain. Mr. Street was present in the hearing room throughout the entire hearing, including during the presentation of Mr. Sheehey's case. As Mr. Street candidly testified on rebuttal after he had heard all the evidence: I would also maintain that the drainage easement which has signs of a historical usage as a drainage easement with a trench, in fact, that conveys water safely to the bay, that should be re-established and maintained. That’s what it’s there for.” Tr. Vol III at 181 (emphasis added.) Thus, it became clear to Mr. Street after listening to all the evidence in the case that the Drainage Easement has not been properly maintained. The trench that was expected to carry stormwater toward the Bay no longer exists. In short, the testimony of Mr. Street, for all his many strengths as a witness, falls short of supporting the position of the Department and Mr. Chbat. Having never visited the site,12/ he approved the project on the basis of drawings that do not conform to the on-site physical reality. When presented with the evidence at hearing that the Drainage Easement is not functioning, he championed re-establishment and maintenance of the Drainage Easement. Mr. Chbat placed part of the Swale's functionality problem on the tide pushing stormwater northward but his case also recognized the maintenance problem caused by deposition of sand that besets the Swale. Mr. Thomason, moreover, recognized that the Drainage Easement has the same maintenance issue. Mr. Chbat's stormwater engineer testified During storm events or just normal wave action in the bay, sand is brought back up on to. . . the sandy area at the end of [Chbat's] lot next to the water. And so that . . . tends to inhibit the natural flow down the swale . . . we have the same problem on the drainage easement . . . where sand builds up in that discharge. Tr. Vol. I at 62 (emphasis added). From this record, it is clear that neither the Swale nor the Drainage Easement functions properly. Their functional status, moreover, is due in significant part to lack of maintenance. It may be that maintenance ultimately will not solve the problem; maintenance efforts to keep the Swale and Drainage Easement clear of the sand deposited by tidal activity may require too much effort for them to be reasonably required. But that evidence was not produced. Indeed, the record was silent as to any maintenance efforts with regard to the Swale by Mr. Chbat or with regard to the Drainage Easement by the owner of the easement. The record is also silent as to whether DEP voiced any concern about the maintenance issues that beset the Swale. It is clear that concern was not raised by the Department in regard to the Drainage Easement until the rebuttal phase of the hearing, since the assumption was made that the easement was properly maintained. Whatever communication may have occurred with regard to maintenance issues among the parties, the Department issued the Amended Permit.13/ The Permit/Authorization Number for the Amended Permit is 66-235320-002-DF.14/ Issued December 19, 2008, the Amended Permit has an expiration date of December 19, 2013. The expiration date coincides with the construction phase of five years on the face of the Amended Permit. See Chbat Ex. 4. Mr. Sheehey Challenges the Amended Permit On January 6, 2009, Mr. Sheehey, pro se, filed with DEP a petition (the "Petition") seeking a formal administrative hearing with regard to "Amended Wetland Resource Permit 66- 00235320-002-DF." Although the Petition makes reference to the Amended Permit, it seeks in the first instance enforcement of the Settlement Agreement that relates to the Final Original Permit. The Petition states: "Petitioner believes that the Florida Department of Environmental Protection has jurisdiction over this matter and should enforce the March 20, 2007 Settlement Agreement which requires that Permittee act in conformance with Exhibit 'A' of the Agreement [the drawing of the Swale]." In the event that DEP declined to enforce the Settlement Agreement, the Petition sets out disputed issues of material fact that relate to issuance of the Amended Permit. The Petition was referred to DOAH on February 19, 2009. One week before the final hearing, the Department filed the motion in limine that is discussed in the Preliminary Statement of this Recommended Order. The motion was granted to the extent that it sought to preclude Sheehey from introducing evidence that supported enforcement of the Settlement Agreement since the 2008 Application, which, while bearing similarity to the 2004 Application, is nonetheless an independent application that should be approved or denied on its own merits without regard to the 2004 Application, the Proposed Original Permit, the Settlement Agreement or the Final Original Permit. The case proceeded to hearing on the remaining issues raised by the Petition: 1) whether Sheehey has standing to contest approval of the 2008 Application; 2) whether Chbat gave the notice required by Section 373.413, Florida Statutes, and 3) whether Chbat's application meets the criteria in statutes and rules for issuance of the Amended Permit. Standing The findings of fact relevant to Mr. Sheehey's standing are found in paragraph 9, above. Notice Notice of the 2008 Application was published in The Defuniak Springs Herald-Breeze, a newspaper published in Defuniak Springs, Walton County, Florida. The notice was published on October 23, 2008. The evidence presented by Mr. Sheehey concerning lack of legal notice consisted of testimony by Mr. Sheehey at hearing in response to questions from his counsel. See Tr. Vol. III at 134. The testimony does not establish that Mr. Sheehey was a person who had filed a written request for notification of any pending application affecting his particular area. The testimony of Mr. Sheehey, moreover, establishes that he was given oral notice of the application by Mr. O'Donnell within four days of its filing. WRP Permitting Criteria To obtain a WRP, an applicant must satisfy the criteria in Florida Administrative Code Chapter 62-312 and Section 373.414, Florida Statutes. These criteria govern a range of topics including water quality. Water Quality15/ Florida Administrative Code Rule 62-312.080 provides that no permit shall be issued unless the Department has been supplied with reasonable assurances that the proposed work will not violate water quality standards. Water that enters the pond spends some amount of time in the pond (residence time) before flowing out. During residence time, solids drop out of the water so that the quality of the stormwater that flows out of the pond is reasonably expected to be better than the quality of the stormwater runoff when it entered the pond. Vegetation surrounding the pond, furthermore, enhances the quality of the water in the pond, whether the water’s source is runoff or rain falling directly into the pond. The water that flows out of the pond north of Alden Lane is “existing discharge.” Tr. Vol. I at 65. It generally made its way to the Bay prior to the Swale. Some of it makes its way to the Bay via the Swale now; some of it outside the Swale as overflow. The culvert extension will convey that discharge to the Bay if the extension is installed. The quality of the water is not significantly less when it discharges to the Bay via the Swale or otherwise from the Chbat property than when it would enter the culvert extension should it be installed. It is true that the Swale would have provided filtration and additional treatment to the discharge from the Eastern Pond Culvert as does the Chbat property in general. But that does not mean that the quality of the culvert’s discharge is a concern. The Swale may have been an option preferable to the extension of the culvert as far as water quality goes but all parties agree that the Swale has failed as a conveyance (albeit Mr. Sheehey maintains that the Swale would work with proper maintenance.) That there is a discharge method that improves the quality of the discharge, such as a swale, does not mean that the discharge to the Bay via the culvert extension is of insufficient quality. None of the parties tested the quality of the discharge from the Eastern Pond Culvert. The Department, nonetheless, offered evidence with regard to its quality. The Department concluded that the quality of the pond and its discharge were not of concern. Had the pond been contaminated to an extent that would have given rise to concerns, moreover, the Swale or the culvert extension as a means of conveying the discharge to the Bay would not have made a “discernible difference.” Tr. Vol. II at 80. The Department provided evidence of assumptions made with regard to the quality of the water that led the Department to conclude that testing of the discharge was unnecessary. Mr. O’Donnell, the Department’s expert in the application of state rules and statutes in wetland resource permitting, detailed the assumptions at hearing: My assumption was that that pond was dug some time in the past as a way to provide fill for roads. That it was never any part of . . . [a] stormwater treatment system. And that it conveyed upstream water through the pond and then on down into Choctawhatchee Bay. It was strictly a [borrow pit and a conveyance pond.] It was never permitted as a treatment system in any way that I was aware of in my diligence [in determining whether the extension should be permitted.] Tr. Vol. II at 79. Once Mr. O’Donnell’s testimony entered the record at the behest of Mr. Chbat, the burden shifted to Mr. Sheehey to prove that the applicant had not provided reasonable assurance of water quality. Mr. Sheehey did not offer evidence of any testing of the discharge. Nor did he offer testimony that rebutted Mr. O’Donnell’s opinion. In fact, the testimony of Mr. Wilkinson (Mr.Sheehey's witness) supported Mr. O'Donnell's opinion with regard to water quality. See Tr. Vol. III at 112. In sum, the Department made assumptions that are found to be reasonable based on Mr. O’Donnell’s expertise and experience. Those assumptions were not shown to be unreasonable by Mr. Sheehey. The Department’s conclusions about water quality flow directly from Mr. O’Donnell’s reasonable assumptions. Reasonable assurances have been provided that the project will not violate water quality standards. Public Interest Test Choctawhatchee Bay is not designated as an “outstanding Florida water.” The test that Mr. Chbat must meet therefore is whether the activity proposed by the permit application is “not contrary to the public interest.” § 373.414, Fla. Stat. In making that determination, the Department is directed by the statute to consider and balance seven criteria. See § 373.414(a) 1-7, Fla. Stat. Of the seven, three are at issue once water quality is determined to be of no concern. Two of the three, “[w]hether the activity will be of a temporary or permanent nature,” Section 373.414(1)(a)5., Florida Statutes, and “[t]he current condition and relative value of functions being performed by areas affected by the proposed activity,” Section 373.414(1)(a)7., Florida Statutes, do not require in-depth consideration. With regard to the nature of the project time-wise, the evidence establishes that the culvert extension is intended to be permanent. With regard to current condition, the area affected by the proposed activity is a residential lot, a substantial portion of which is under water following heavy rain. To facilitate the conveyance of stormwater, the lot is served by the Swale. The Swale is not functioning optimally because of lack of maintenance and because of the Ridge. With regard to relative value from the standpoint of water quality, the function being performed by the lot and the Swale is little, at least as established by this record. While it is certainly true that the lot with or without the Swale will filtrate and otherwise treat stormwater runoff from the pond, the difference in the quality of the stormwater conveyed by the culvert extension from that which would enter the Bay without the extension is not significant. See the discussion above of Mr. O’Donnell’s accepted opinions. Of the seven statutory criteria to be weighed and balanced by the Department, the one that is central to this case is found in subparagraph 1., of subsection (1)(a): “[w]hether the [culvert extension] will adversely affect . . . the property of others.” The “property of others” in this case is the property of Mr. Sheehey. The Project’s Effect on the Property of Mr. Sheehey. For the reasons discussed in paragraphs 63-70, above, Mr. Chbat has failed to provide reasonable assurances that the project will not have a detrimental effect on the property of Mr. Sheehey. The extent of the detrimental effect to Mr. Sheehey's property is difficult to determine from this record but it is highly likely based on all the evidence of record that there will be a detrimental effect: additional flooding in heavy rain events.
Recommendation Based on the foregoing, it is recommended that the Department of Environmental Protection deny17/ the Amended Permit for the failure of Mr. Chbat to provide reasonable assurances that the project will not adversely affect Mr. Sheehey's property. DONE AND ENTERED this 14th day of January, 2010, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of January, 2010.
Findings Of Fact The Respondent is licensed to construct water wells. He constructed such a well on the property of Mr. Robert Phorte, Highway 90 West, Marianna, Florida, on June 18, 1976. The water well casing of that well was placed in a bore hole with a diameter in excess of the outside diameter of the water well casing, thus leaving an open annular space. That annular space was not filled with grout from bottom to top as required by Rule 16G-3.21(2)(d) and 17- 21.10(2)(d), F.A.C. The subject well obtains its water from a rock layer or other consolidated geologic formation in Jackson County, Florida. At the time Respondent constructed the subject well Mr. T. E. Langford, an inspector for the Northwest Florida Water Management District, was on the job site and observed the construction of the well. Mr. Langford was aware that the annular space around the subject well was not filled with grout, but for a small cap at the top of the well. However, the unrebutted testimony shows that Mr. Langford told Respondent that the well "was perfect and needed no grout."
Recommendation Respondent did not dispute that he failed to construct the subject well in accordance with the grouting requirements set forth above. However, it is noted that an inspector and representative of the Northwest Florida Water Management District was present on the job site throughout the construction of the well and, though aware that the well had not been grouted as required, made no attempt to suspend the construction of the well and, in fact, told Respondent that the well did not need grout. Therefore, it is hereby RECOMMENDED that the Respondent, Lester M. Basford, be instructed that hereinafter all wells constructed by him shall conform without exception to the rules for such construction including the grouting of wells. However, because of the presence on the job site at the time of construction and apparent acquiescence by the agent of the Northwest Florida Water Management District and in light of the lack of showing that failure to grout this particular well will directly lead to contamination of the aquifer or some other serious consequence, it is RECOMMENDED that no further action be taken against the Respondent on this violation. ENTERED this 31st day of March, 1977, in Tallahassee, Florida. CHRIS H. BENTLEY Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 1977. COPIES FURNISHED: J. W. Holder, Esquire Barrett, Boyd and Holder Post Office Box 1501 Tallahassee, Florida 32302 Lester Basford Route 4 Graceville, Florida 32440
The Issue The issues for determination in this case are: 1) whether the Department of Environmental Protection (DEP) has dredge and fill permitting jurisdiction over a certain body of water known as Lake Blake in Okaloosa County, Florida; 2) if DEP's dredge and fill permitting jurisdiction is established, whether Petitioner qualifies for an exemption from DEP's dredge and fill permitting jurisdiction; and 3) if not otherwise exempt from DEP's dredge and fill permitting jurisdiction, whether Petitioner's application No. 46-0199306-001-EE, seeking to place a modular home on a fill pad in Lake Blake, should be approved by DEP.
Findings Of Fact Parties DEP is the agency of the State of Florida vested with the power and duty to enforce the provisions of Chapters 373 and 403, and the rules promulgated in Chapter 62, Florida Administrative Code. DEP is the only agency involved in these proceedings. Lee Maddan (Maddan) is a long-time resident of Okaloosa County, and the Petitioner in Case No. 03-1499. Maddan is a Respondent in Case No. 03-2040. Maddan has personally observed activities occurring at the Lake Blake property for more than 38 years, including the excavation of the lake. Santa Rosa Three, Inc. (the Corporation), is a Respondent in Case No. 03-2040, and holds fee simple title to the property containing Lake Blake, which is located in unincorporated Okaloosa County between Lewis Street and Clifford Street in Sections 2 and 3, Township 2 South, Range West. Santa Rosa II is also Respondent in Case No. 03-2040, and is a corporate predecessor in interest to the Corporation. Maddan holds equitable title to the Lake Blake property and is in the process of purchasing the fee simple title to the property from the Corporation. Maddan is and was at all material times hereto authorized by the Corporation to enter upon the Lake Blake property, to proceed to develop the land, to obtain permits in his name and to do other acts to prepare the property for Maddan's purchase. History of Lake Blake Lake Blake is an artificially created water body in unincorporated Okaloosa County, having a water surface area slightly less than six acres. There is a small island in the center of the lake. The property surrounding Lake Blake presently consists of both uplands and wetlands. No other water body is visible from Lake Blake. For DEP jurisdictional determination purposes, Lake Blake is located in the Northwest District of Florida. The oldest records of the Lake Blake property dating to 1826, indicate that the property was flat land with natural vegetation dominated by palmetto and galberry. The property historically had no flowing streams. In the 1950's the then owner of the property began excavating a borrow pit on the property. The excavations continued until approximately 1979. As the borrow pit excavations continued a lake formed due to the intrusion of underground water as well as collected rainfall. During the excavation period, and until approximately 1976, the land around the borrow pit was primarily pasture land with no trees or other vegetation. Up to 1976, there was no wetland vegetation growing on the property. Prior to 1960, the natural stormwater flow from the property was to the southwest toward Cinco Bayou, a defined water body of the State of Florida which on a direct line is located approximately one-quarter mile from the property. Cinco Bayou is the body of water of the State nearest to Lake Blake. During the 1960's, a road known as Lewis Street (also known as Mayflower Avenue) was constructed along the southern boundary of the property. At the time of the construction of Lewis Street, the borrow pit was separated into two parts, an eastern and western section. A concrete culvert divided the sections of the borrow pit. At the time of the Lewis Street construction, a stormwater discharge pipe was installed by Okaloosa County and excess water flowed out of the borrow pit only at certain times in direct response to rainfall. The installation of the stormwater discharge pipe on Lewis Street was intended to drain excess rainfall from the borrow pit. Okaloosa County never acquired ownership of the borrow pit for use as a stormwater retention pond. The water body that formed in the borrow pit would come to be called Lewis Street Pond, or Blake Lake, and eventually Lake Blake. The natural flow of the stormwater from the property was further altered in the 1970's when a public elementary school was constructed by Okaloosa County on Lewis Street. The public school is located between the property and Cinco Bayou. Borrow pit operations formally ceased in September of 1980 when DEP's predecessor agency, the Department of Environmental Regulation (DER), entered an order requiring the cessation of mining operations. The physical operations had actually ceased a few years before the DER order. Lake Blake originally resulted from collected rainfall, as well as underground water intrusion in the borrow pit. Over the subsequent years and at the present time, additional diverted stormwater runoff collected in the lake as a result of Okaloosa County's stormwater drainage system. Lake Blake today is an artificial body of water owned entirely by one person. Residential housing is located on property surrounding Lake Blake. The lake is occasionally utilized for recreational purposes, including fishing. The property surrounding the lake is not open to the general public, and the entrances to the property are fenced. For purposes of this proceeding, there are no threatened or endangered plants on the property. Okaloosa County Stormwater Drainage System Okaloosa County has constructed a stormwater drainage system that runs through the Lake Blake drainage area. As part of this stormwater drainage system, Lake Blake collects diverted stormwater discharge from surrounding areas which have been previously developed. Residential neighborhoods are close to the area, specifically the Berkshire Woods Subdivision. Indeed, as a condition for the development of the Berkshire Woods Subdivision in 1976, the Okaloosa County Planning Commission required that a former owner of the property, Ron Blake, excavate the lake and have it made ready for stormwater drainage from the proposed development of the Berkshire Woods Subdivision. In addition to the residential areas and the public school to the south, there is a private school to the north across the road on Clifford Street which also diverts water to the lake from its campus and parking lots Okaloosa County has installed several pipes which carry stormwater from the surrounding developed areas into Lake Blake. The only drainage out of Lake Blake is via the stormwater discharge pipe located at the southern boundary of the property on Lewis Street which was installed by Okaloosa County in the 1960's. Okaloosa County's stormwater discharge system serving Lake Blake is integrated into a series of interconnecting underground stormwater pipes which route the flow of the water for approximately one-half mile before ultimately discharging water into Cinco Bayou. Okaloosa County's stormwater discharge system which ultimately connects Lake Blake with Cinco Bayou is composed of buried pipes. DEP considers buried pipes or culverts which convey stormwater as excavated water bodies. The installation of Okaloosa County's stormwater discharge system required the excavation of land. Under DEP's interpretation of its rules, specifically Rule 62-312.030(2), Florida Administrative Code, the underground installation of stormwater pipes is sufficient to establish a series of excavated water bodies which connect Lake Blake to Cinco Bayou. Prior to the installation of Okaloosa County's stormwater discharge pipe on Lewis Street in the 1960's, there was no dredge and fill permitting jurisdiction which applied to the property containing Lake Blake. The stormwater discharge pipe has continuously existed on the southern boundary of the property since its installation in the 1960's to the present. Lake Blake was not originally designed, constructed, nor permitted as a stormwater treatment or retention pond. Lake Blake incidentally resulted from the borrow pit excavations. Okaloosa County, however, has at least since 1976 utilized Lake Blake as part of its stormwater drainage system. Okaloosa County never acquired title to Lake Blake. In 1981, the Okaloosa County Board of Commissioners (who were not the owners of the property) applied for, and were issued by DER, a Construction Permit (No. RC-46-80-2031, dated May 27, 1981, which expired November 27, 1981), for "Blake Lake Modifications," which permit stated it was "to modify an existing stormwater drainage system." This permit allowed for, among other items, construction of "two earthen berms in Blake Lake" and "the diversion of lake flow from the western lake to the eastern lake." Although attempts were made to construct the two earthen berms, due to the white clay composition of the soil the berms were not successfully established. In 1984 DER issued another Construction Permit (No. 460853421 dated August 20, 1984, which expired August 15, 1987) to the Okaloosa County Board of Commissioners (who again were not the owners of the property) for the purpose constructing "two drainage channels . . . from a berm separating East and West Blake Lake." The drainage channels were thereafter completed and the east and west portions of the lake were eventually connected. On August 14, 1984, Okaloosa County also filed a Notice of New Stormwater Discharge with DER which proposed a re-routing of an existing stormwater drainage system which then diverted stormwater from the Candlewood Subdivision and Navy Street into Lake Blake. The stated purpose of the re-routing of the stormwater drainage system away from Lake Blake was to address flooding problems in the Candlewood Subdivision. By letter dated August 21, 1984, DER informed Okaloosa County that "the stormwater discharge is exempt from stormwater permitting requirements of the Department pursuant to Florida Administrative Code Rule 17-25.03(2)(c)." DER came to this conclusion in 1984 because the proposed project was "the modification of an existing County stormwater management system not serving a new development or increasing pollution loading." Although Lake Blake was utilized by Okaloosa County as part of the existing Okaloosa County stormwater drainage system, which in 1984 qualified for a DER stormwater permitting exemption, nothing pertaining to this stormwater permitting exemption supports a finding that Lake Blake was originally constructed, permitted or designed solely for the purpose of stormwater treatment so as to qualify for an exemption from DEP's dredge and fill jurisdiction under Rule 62-312.050(4), Florida Administrative Code. Dredge and Fill Permitting Jurisdiction Prior to the installation of Okaloosa County's stormwater discharge pipes on the property in the 1960's, there was no dredge and fill permitting jurisdiction which applied to the property and Lake Blake. Under current law, the Northwest District of Florida is governed by separate jurisdictional determination provisions. In order to initially establish DEP's dredge and fill permitting jurisdiction over wetlands and surface waters in the Northwest District, DEP must demonstrate that the wetlands and surface waters are connected to the surface waters of the State. Since 1995, isolated wetlands in all the rest of the State of Florida are regulated by DEP without regard to any connection to the surface waters of the State. In the Northwest District under Rule 62-312.030(2), Florida Administrative Code, "surface waters of the state are those waters listed below and excavated water bodies, except for those exempted by Section 62-312.050(4), F.A.C., which connect directly or via an excavated water body or series of excavated water bodies . . ." to waters of the State. Under Rule 62- 312.045, Florida Administrative Code, however, "[i]solated wetlands that infrequently flow or otherwise exchange water with a described water body are not intended to be included within the dredge and fill jurisdiction of the Department." By letter dated April 24, 2001, DEP advised Santa Rosa II, Inc., that the Lake Blake property was not subject to DEP's dredge and fill jurisdiction. The letter was sent in response to an application seeking to fill 2.5 acres of the southeastern portion of the lake for the construction of an apartment complex. The letter was issued by DEP's Northwest District, and signed by Martin Gawronski on behalf of Larry O'Donnell, the Environmental Manager for Permitting Section of the Northwest District. The letter was issued after a visit to the property by one or more DEP employees, and based on an informal determination that Lake Blake was not connected to the waters of the State. In May of 2001, the United States Army Corps of Engineers determined that the Lake Blake property was not within its jurisdiction. Subsequent to the issuance of the April 24, 2001, non- jurisdictional letter, certain employees of Okaloosa County (not specifically named in these proceedings) contacted DEP seeking reconsideration of DEP's decision. These Okaloosa County employees thereafter met with DEP employees at the property and communicated by telephone with DEP employees while DEP considered a re-determination of its non-jurisdictional decision. The property owners were then notified that DEP was in the process of re-evaluating its non-jurisdictional decision. By letter dated October 24, 2001, DEP advised Santa Rosa II, Inc., that DEP had made a "correction" to the letter of April 24, 2001, and had determined that the property was in fact subject to DEP's dredge and fill permitting jurisdiction, because the "pond" was "connected to jurisdictional waters" of the State. The October 24, 2001 letter, like the previous letter, was issued from DEP's Northwest District signed by Martin Gawronski on behalf of Larry O'Donnell. Between April 24, 2001, and October 24, 2001, there were no man-made alterations made to the Lake Blake property. Between March and April 2002, Maddan filled in a portion of the lake and lacustrine wetlands. Maddan also built two pedestrian footbridges over the lake to the small island in the middle of the lake. DEP asserted its dredge and fill permitting jurisdiction based upon the existence of a series of underground pipes installed by Okaloosa County as part of its stormwater drainage system that conveys excess stormwater from Lake Blake to Cinco Bayou. Installation of the underground pipes required excavation. Neither the April 24, 2001 letter, nor the subsequent October 24, 2001, letter issued by the Northwest District, is binding determination of DEP's dredge and fill permitting jurisdiction over the wetlands and surface waters of Lake Blake. The authority to make a binding DEP dredge and fill permitting jurisdictional determination is vested in Dr. John Tobe, Environmental Administrator of the Wetland Evaluation and Delineation Section and his staff. DEP's Site Inspections/Jurisdictional Determination In April of 2002, Stacy Owens, DEP Environmental Specialist, received a telephone call from Chuck Bonta with the Okaloosa County Code Enforcement Department, and an unnamed homeowner, complaining that Lee Maddan had built two unpermitted pedestrian footbridges at Lake Blake and was also filling in part of Lake Blake. Ms. Owens initially investigated whether DEP had issued any permits for the placement of fill in Lake Blake or the surrounding wetlands, and determined that no permits had been issued. Ms. Owens further discovered that a prior Notice of Violation and Orders for Corrective Action had been issued by DER in 1980 against the Okaloosa County Board of Commissioners and Lloyd D. Junger (a lessor conducting mining operations). The 1980 case pertained to the discharge of turbidities from the Lewis Street Pond into Cinco Bayou. A final order in that case was entered on January 5, 1981, requiring Okaloosa County to make payment to DER and take corrective action. On April 23, 2002, Ms. Owens followed up on these complaints by performing a site visit to Lake Blake. At this time Ms. Owens observed two unpermitted pedestrian footbridges, unpermitted fill in a finger of Lake Blake, and unpermitted fill within a 20-foot by 25-foot lacustrine wetland area. On April 25, 2002, Maddan came to Ms. Owens' office to discuss whether permits were necessary for the placement of fill at Lake Blake. At that time Maddan showed Ms. Owens the previous letters of April 24, 2001, and October 24, 2001, which had been sent from the Northwest District of DEP. Maddan stated that in his opinion no dredge and fill permit was needed because Lake Blake was not within the jurisdiction of DEP. Ms. Owens was then informed by employees of Okaloosa County that there were underground pipes connecting Lake Blake to Cinco Bayou. She obtained from Gary Bogan of Okaloosa County an aerial map of the drainage area for Lake Blake which identified the location of the culvert on Lewis Street which conveys excess flow from Lake Blake to Cinco Bayou. On April 30, 2002, Ms. Owens performed another site inspection at Lake Blake. During this site inspection, she tracked the connection from Lake Blake to Cinco Bayou by personal observation. After her second site inspection, Ms. Owens e-mailed her findings to Dr. Tobe, and inquired whether the underground pipes satisfied the DEP requirements for connection to a water body of the State for the purpose of establishing DEP's dredge and fill permitting jurisdiction. Dr. Tobe replied to Ms. Owens that an underground pipe connection would satisfy DEP's jurisdictional requirements. On June 25, 2002, Dr. Tobe, Ms. Owens, and a DEP wetland delineation team visited the Lake Blake property for the purpose of making a jurisdictional determination. Maddan also accompanied Dr. Tobe and his team on the day of the site inspection. As a result of this inspection, Dr. Tobe completed and filed a Field Report for Lake Blake, Okaloosa County, dated June 25, 2002. As indicated in his Field Report, Dr. Tobe and his wetland delineation team determined that for jurisdictional purposes, Lake Blake was connected to the waters of the State by reason of the culvert on Lewis Street that ultimately discharges into Cinco Bayou. At the time of his inspection on June 22, 2002, Dr. Tobe did not observe water flowing from Lake Blake into the Lewis Street culvert. Dr. Tobe attributed this to abnormal drought conditions the area was then experiencing. Maddan, who has observed this area for many years, testified that the lake was near or slightly less than its normal water level on that date. Dr. Tobe conducted a further examination of the area to determine the ordinary high water line, and concluded that Lake Blake would at ordinary high water level flow into the Lewis Street culvert on a sufficiently regular frequency into Cinco Bayou, a water body of the State, in order to establish DEP's dredge and fill jurisdiction. In determining whether water exchange frequency is sufficient to establish jurisdiction, there is a DEP Interoffice Memorandum of October 31, 1988, setting out 25-year, 24-hour criteria which is used as guidance, but the criteria stated in this Memorandum have not been adopted as a rule, and are not singularly determinative of DEP's jurisdiction. At this time, Dr. Tobe and his team also performed a wetland boundary delineation. Dr. Tobe found hydric soils and wetland plants dominating the area. The wetland delineation boundary was determined by the continual interpretation of vegetation, soils, and hydrologic indicators. As a result of his inspection and wetland boundary delineation, Dr. Tobe concluded that unpermitted fill had been placed within the surface waters of the State, and in lacustrine wetlands.. Thereafter on July 18, 2002, DEP sent Maddan a Warning Letter (DF-SO-46-022) requesting that Maddan cease dredging, filling or construction activities at Lake Blake without obtaining a permit. Subsequent to DEP's sending Maddan the Warning Letter of July 18, 2002, Stacy Owens visited the Lake Blake site on numerous occasions beginning in October of 2002, and continuing through July of 2003. On most of these site visits Ms. Owens observed water flowing from Lake Blake through the Lewis Street culvert. Ms. Owens documented water flowing from Lake Blake through the Lewis Street culvert on October 29, 2002, November 5, 2002, May 20, 2003, June 20, 2003, June 23, 2003, June 27, 2003, and July 8, 2003. The area was not experiencing abnormally excessive rainfall events at the times that Ms. Owens documented water flowing from Lake Blake into the Lewis Street culvert. Maddan testified that in his personal observation over many years, Lake Blake generally discharges excess stormwater into the Lewis Street culvert only as a result from a significant rainfall event. Lake Blake discharges water into the Lewis Street culvert at regular intervals. The water discharged from Lake Blake ultimately is released through the Okaloosa County stormwater drainage system into the surface waters of Cinco Bayou, a water body of the State of Florida. The Okaloosa County stormwater drainage system connecting Lake Blake to Cinco Bayou is a series of excavated water bodies. Lake Blake is connected to the surface waters of Cinco Bayou, and regularly exchanges water with Cinco Bayou. Exemptions from DEP's Jurisdiction To assert dredge and fill permitting jurisdiction over this property, not only must Lake Blake be connected to the waters of the State, but the property must not be otherwise exempt from dredge and fill permitting jurisdiction under either statute or rule. On August 29, 2002, under the authority of the Corporation, Maddan filed a "Joint Application for Works in the Waters of Florida" with DEP requesting an exemption from DEP's dredge and fill permitting jurisdiction under Rule Chapter 17- 312, re-codified as Rule Chapter 62-312. Rule 62-312.050, Florida Administrative Code, sets out the recognized exemptions to DEP's dredge and fill permitting jurisdiction. Maddan primarily relies on Rule 62-312.050(4) which provides that "[n]o permit under this chapter shall be required for dredging or filling in waters which are contained in those artificially constructed stormwater treatment and conveyance systems designed solely for the purpose of stormwater treatment and that are regulated by the Department or the water management district." Lake Blake, however, is the result of excavations in a borrow pit. Because of surrounding development, Lake Blake receives stormwater runoff; however, the lake was not "designed solely for the purpose of stormwater treatment," and cannot therefore qualify for this exemption. Maddan also cites Rule 62-312.050(1)(g), Florida Administrative Code, which provides an exemption for the "construction of seawalls or riprap, including only that backfilling needed to level land behind the seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control." Even assuming that the filling of the finger of Lake Blake meets the test of construction of a seawall, there is no evidence that such filling of Lake Blake was ever subjected to appropriate water quality tests, much less meeting such water quality tests as well as the other requirements of this exemption. In addition to the exemptions established by Rule 62- 312.050, Maddan cites statutory exemptions. The definition of "waters" which are regulated under Chapter 403 as set forth in Section 403.031(13), provides in pertinent part that "[w]aters owned entirely by one person other than the state are included only in regard to possible discharge on other property or water." Although Lake Blake is owned entirely by one person, this provision does not exempt Lake Blake because the lake actually discharges on the surface waters of Cinco Bayou. Maddan also cites Section 403.812, which provides that "[t]he department shall not require dredge and fill permits for stormwater management systems where such systems are located landward of the point of connection to waters of the state and are designed, constructed operated and maintained for stormwater treatment, flood attenuation, or irrigation." Although Lake Blake has been utilized by Okaloosa County's stormwater drainage system which is located landward of Cinco Bayou, the lake was not designed nor constructed for stormwater treatment, flood attenuation or irrigation, and it is not being operated nor maintained for stormwater treatment, flood attenuation or irrigation. Lake Blake does not qualify for an exemption from DEP's dredge and fill permitting jurisdiction. Dredge and Fill Permit Denial On September 30, 2002, Maddan was notified of DEP's denial of his application to place a modular home on a fill pad in Lake Blake. Because Maddan took the position that DEP did not have dredge and fill jurisdiction over Lake Blake, or alternatively that Lake was exempt from DEP's jurisdiction, an analysis of whether Maddan's application might be approved under Rule 62- 312.060(5), Florida Administrative Code, has not been done. DEP has not performed any analysis of water quality standards nor public interest assessment required by the rule, and Maddan offered no evidence which would be necessary to make such determinations.
Recommendation Based upon the foregoing findings of fact and conclusions of law, it is recommended that a final order be entered upholding denial of Maddan's Permit Application No. 46-0199306- 001-EE. DONE AND ENTERED this 10th day of October, 2003, in Tallahassee, Leon County, Florida. S RICHARD A. HIXSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of October, 2003. COPIES FURNISHED: Charles T. Collette, Esquire Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 James E. Moore, Esquire Post Office Box 746 Niceville, Florida 32588 Robert W. Stills, Jr., Esquire Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri L. Donaldson, General Counsel Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kathy C. Carter, Agency Clerk Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
The Issue The issue for consideration in this case is whether sufficient grounds exists for the Petitioner, West Coast Regional Water Supply Authority, to terminate Respondent, Steve Toler, Jr.'s employment with the Authority because of the matters alleged in the Letter of Termination dated February 15, 1995.
Findings Of Fact At all times pertinent to the allegations herein, the Petitioner, Authority, was a governmental agency with membership held by Hillsborough, Pinellas and Pasco Counties and the cities of St. Petersburg and Tampa. It is charged with the responsibility of providing water resource management for its members. In November, 1994, the Respondent, Steve Toler, Jr., then employed for 9 1/2 years by the Authority as a maintenance technician, was under the supervision of Ben Nevel, lead supervisor for his crew and Harry Vogel, the facilities maintenance supervisor at Cypress Creek pump station. Just before Thanksgiving that year, his crew was given the responsibility of removing certain supposedly above ground aluminum pipe belonging to Pinellas County and replacing it with buried PVC pipe on the county's well field on Cross Bar Ranch, owned by Pinellas County. On the last day of the project Respondent was working by himself at the job site doing those things necessary to complete the project. This included removing three aluminum pipes and replacing them with three PVC pipes. In the course of the removal of the aluminum pipe, two pipes were damaged by Respondent because they were buried and he could not see them. When Respondent attempted to bury the three pieces of PVC pipe, he found that he needed some pipe lubricant in order to get them joined and called the pump station to have someone bring it. The lubricant was brought to the site by Mr. Vogel about noon, and the two men talked about the project. According to Mr. Vogel, Respondent made no mention of any damaged pipe nor did Vogel see any damaged pipe while he was at the site. Vogel adamantly denies that he ever, either that day or at any other time, told Respondent that he could throw away damaged pipe. The instructions that Vogel had left with Mr. Nevel for transmittal to the crew was that the removed pipe was to be placed in storage at the north end of the ranch because it belonged to Pinellas County, not to the Authority, and even if the pipe was damaged, the ends might be used for fittings. It is not clear whether Respondent knew the pipe belonged to the county or to the cattle company which had originally owned the ranch. Notwithstanding, Respondent took the two damaged pipes back to the Cypress Creek pumping station where, without speaking to anyone about what he proposed to do, he placed them in the trash dumpster for disposal. The following day, after completing his day's work, Respondent noted that the pipe was still in the dumpster and, without seeking approval from anyone, removed it from the dumpster, placed it in his truck, and that same day, sold it to All American Metal Recycling in Land O'Lakes, Florida, for $29.00 which he kept for his personal use. He collects scrap aluminum and copper in order to sell them. Respondent admits that as an Authority employee, he did not have the authority to take property owned by the Authority or its members for his own use. Ordinarily, he admits, the disposal of Authority-owned property had to be approved. The authority for approval, as contained in the agency's standard operating procedure for disposal of Authority assets, dated February 14, 1994, was the Cypress Creek storekeeper. Though it is not written, the Authority has a policy against employees taking material out of the dumpsters at the Cypress Creek facility. It was Toler's understanding, however, that old, unusable pieces of piping and wood could be thrown away, but equipment and property that had value had to be turned into Mr. Rooney, the storekeeper, who would evaluate it for disposal or repair. At no time did Respondent have the authority to make that determination. Mr. Toler admits he was aware of the Authority's policy on the disposal of property as noted in the February 14 SOP, as it had been outlined at no lees than two safety meetings he had attended. He understood that if he threw property away without authority, he could be fired. In fact, he admits, Mr. Vogel had so advised him of that. In the instant case, however, he contends, Mr. Vogel told him on the last day of the project in issue, in response to his inquiry, that he should throw the damaged pipe away. This was, as stated earlier, categorically denied by Mr. Vogel. Respondent also indicates that on the second day of the project, pipe being removed was damaged. That pipe was taken to the north pasture and stacked near other, undamaged pipe. The total amount of aluminum pipe removed in this project consisted of approximate one hundred twenty foot long "sticks". Respondent well knew he could not take and sell the stacked pipe, even that which was damaged. Respondent claims that no one saw him put the damaged pipe into the dumpster. He did not think about the opportunity to salvage the pipe when Mr. Vogel told him to throw it away or even when he brought it back and threw it into the dumpster. It was not until the next day when, after work, he saw the pipe still in the dumpster, that it occurred to him to take it, he claims. Respondent admits he has taken scrap metal and sold it before and claims others have done so, too. When he put this pipe in the dumpster he realized that others might take it, so he was somewhat surprised when it was still there the next day. Respondent also admits he did not tell Mr. Vogel how he had disposed of the pipe at first. Once the situation came under investigation, however, as a result of an inquiry regarding missing pipe from the Cross Bar Ranch project, he did so. He admits that sometime after the day he took and sold the pipe as scrap, but before the investigation was commenced, Mr. Vogel asked him what he had done with the pipe, and Respondent replied he had thrown it away. A few days later, in Vogel's office, when the investigation had begun, Mr. Vogel again asked Respondent what he had done with the pipe, and this time Respondent admitted to scrapping it. In the course of the investigation, Respondent spoke with Mr. Capp, a Cypress Creek engineer, about the allegation. In that conversation, held in Mr. Capp's office while no one else was present, Respondent admitted selling the broken pipe for scrap and advised that Mr. Vogel had told him to throw it away. At that time, he offered to replace the pipe, but his offer was not accepted. Some time later, and prior to the pre-disciplinary hearing, he was given a letter by Mr. Capp placing him on administrative leave pending investigation. At that time, Mr. Capp denied knowing what was in the letter. On February 8, 1995 a pre-disciplinary hearing was held with Respondent and counsel present at which time Respondent was given an opportunity to tell his side of the story. At that time, he did not mention any other individuals who had taken scrap from the dumpster, nor had he ever told Mr. Vogel, Mr. Capp or Mr. Kennedy about that. He claims he does not know of any cases where either Mr. Capp or Mr. Kennedy knew of others taking scrap but not being disciplined. However, Respondent is of the opinion Mr. Vogel knows what is going on but he cannot be sure. As was stated previously, Respondent has taken scrap from the dumpster before and claims Mr. Vogel knew it. Vogel, predictably, denies that. Some time after the pre-disciplinary hearing, after Kennedy received the information regarding the incident as determined therein, he discharged Respondent for several violations of the Authority's personnel rules. These included the removal and sale of the scrap pipe owned by Pinellas County, committing a breach of public trust, and committing a breach of member government trust which was deleterious to the Authority in that, in Kennedy's opinion, it undermined the public's faith and confidence in the Authority's public service responsibilities. Kennedy asserts that the relationship between the Authority and its member governments requires that each cooperate with the other in the mission to supply water to the public. Trust and confidence are essential elements of that relationship. Employees of the Authority and its member governments frequently are in and out of each others' facilities. If a member government loses trust in an Authority employee, the Authority's ability to efficiently perform its function would be hampered. This is a reasonable and supportable position and it is so found. In the past, the Authority has discharged employees for violating employee rules which reflect adversely on Authority integrity. One was discharged for the improper use of an Authority vehicle, and others have been discharged for violations of the property disposal policy. It would appear that Mr. Toler has not been treated differently than any others who were found to have violated similar policies. Since February, 1944, when the Authority adopted its policy regarding disposal of property, three employees, including Respondent, have removed materials from the dumpster at the Cypress Creek facility for their own use. Among these are Mr. Nevel who admits to taking electric wire and three discarded printers. Nothing taken by the others included aluminum pipe, however. Capp, Kennedy and Vogel all deny knowing that employees were taking scrap. Respondent cannot say that any of them did know. Consistent with that philosophy, Mr. Kennedy indicates he would have discharged Respondent for placing the scrap in the dumpster whether or not he sold it. By the same token, he would have discharged Respondent had he taken and sold the pipe, even if he had not placed it in the dumpster. Another incident arose in June, 1995, just prior to the hearing, involving the potential disposal of scrap pipe. Mr. Kennedy learned that a stick of aluminum pipe was in the dumpster at the Cypress Creek facility. The pipe, owned by the Authority, had been placed there by Mr. Rooney, the storekeeper, after Mr. Nevel used the ends to retrofit some piping at the Cross Bar Ranch. When this was discovered, Mr. Kennedy directed the pipe be recovered and held for possible future use or sale. Whereas Respondent contends this action was an attempt at a cover-up, it is more likely the result of an unintentional discard of potentially useful pipe.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the East Coast Regional Water Supply Authority deny Respondent's Petition for Relief and Enter a Final Order discharging him effective February 15, 1995. RECOMMENDED this 29th day of August, 1995, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of August, 1995. APPENDIX TO RECOMMENDED ORDER The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: & 2. Accepted and incorporated herein. & 4. Accepted but irrelevant to any disputed issue of fact. Accepted. - 8. Accepted. 9. - 14. Accepted and incorporated herein. 15. - 19. Accepted and incorporated herein. 20. - 25. Accepted and incorporated herein. 26. & 27. Accepted and incorporated herein. 28. Accepted. 29. Accepted and incorporated herein. 30. Accepted and incorporated herein. 31. Accepted and incorporated herein. FOR THE RESPONDENT: Respondent's counsel has identified his Proposed Findings of Fact by letter rather than number. For the sake of consistency in this Order they will be re- identified herein with numbers. Accepted and incorporated herein. & 3. Accepted but not dispositive of any issue of fact. - 8. Accepted and incorporated herein. Accepted but not dispositive of any issue of fact. - 12. Accepted and incorporated herein. Accepted and incorporated herein. Rejected as not a proper Finding of Fact but more a Conclusion of Law. COPIES FURNISHED: Gregory A. Hearing, Esquire Thompson, Sizemore & Gonzalez, P.A. 109 North brush Street, Suite 200 Post Office Box 639 Tampa, Florida 33601 Michael S. Edenfield, Esquire Battle & Edenfield, P.A. 206 Mason Street Brandon, Florida 33511 General Manager West Coast Regional Water Supply Authority 2535 Landmark Drive, Suite 211 Clearwater, Florida 34621 Donald D. Conn General Counsel West Coast Regional Water Supply Authority 2535 Landmark Drive, Suite 211 Clearwater, Florida 34621