Findings Of Fact Lake Powell Improvement Corporation is a consortium of interested owners of land comprising the majority of the Lake Powell shoreline. Camp Helen Company, one of its members, owns lake property which was formerly operated as a recreational facility for associates of Avondale Mills. Camp Helen Company now holds the property for the possibility of future development. George Jeter is one of approximately 76 persons who sent a form letter to the Department of Environmental Regulation (DER) in opposition to the designation of Lake Powell/Phillips Inlet as an Outstanding Florida Water (OFW). The rule-making proceeding to designate Lake Powell/Phillips Inlet an OFW was initiated with a petition filed on June 11, 1987, by the St. Andrews Bay Resource Management Association, a private citizens' organization formed in 1986 to help protect wildlife and resources in the St. Andrews Bay area. A public workshop was conducted by DER on September 6, 1990, in Panama City, Florida. Approximately 70 persons attended the workshop, including Bay County residents, Walton County residents, Lake Powell area property owners and representatives from various organizations. Craig Crockard, Vice President of Lake Powell Improvement Corporation, opposed the designation based on alleged degradation of property values and tax base, negative impact on growth and increase in road maintenance costs. Agency staff encouraged workshop participants and members of the public to submit information, including economic information, that would aid in the decision-making process. Only general and speculative information was received, with the exception of a response from the Department of Transportation that costs of future construction and expansion of the Phillips Inlet bridge, part of four-laning Highway 98, would be increased by $1.5 million as a result of the OFW regulations. DER sent a letter to Craig Crockard, received on April 2, 1991, requesting specifics as to the property owners' development plans and estimated economic impacts by April 5th. Crockard responded that the deadline was too short and that it was obvious that the decision had already been made. At no time, up to and including the hearing before the Environmental Regulation Commission (ERC), did Petitioners or other opponents provide information as to specific economic impacts of the proposed designation. The proposed rule would add the following area to rule 17- 302.700(9)(i), F.A.C. specifying special waters under the OFW designation: Special Waters * * * Lake Powell, Phillips Inlet, and all tributaries to Lake Powell as bounded by the following described line: Begin at the Northwest corner of Section 26, Township 2 South, Range 18 West; thence East to the Northwest corner of Section 29, Township 2 South, Range 17 West; thence South to the Northwest corner of the SW 1/4 of Section 29, Township 2 South, Range 17 West; thence East to the West line of Section 27, Township 2 South, Range 17 West, thence South to the mean high water line of the Gulf of Mexico; thence meander Northwest along the mean high water line to the West line of Section 35, Township 2 South, Range 18 West; thence North to the point of beginning ( - - 91). * * * In making its determination to recommend OFW designation for Lake Powell to the ERC, the Department compared Lake Powell to other water bodies. Lake Powell was found to be exceptionally ecologically and recreationally significant in terms of size, water quality and recreational usage. The Department makes its determination as to whether the proposed water body is exceptional by making direct comparisons to features of other water bodies, and by relying on the professional judgements of others familiar with the particular class of water bodies. Lake Powell has been compared by professionals familiar with other water bodies in the area and in their opinion it has exceptional value as an ecosystem. The Department relied on professional judgement of this type as well as its own findings when making the determination that Lake Powell was exceptional. Lake Powell is located in Bay and Walton Counties in Northwest Florida adjacent to the Gulf of Mexico. Its total surface area of 737 acres makes it the largest by far of any of a series of similar lakes in the area. Seven small streams provide fresh water to the lake; periodically Phillips Inlet, connecting the lake to the Gulf of Mexico, opens or closes. When the inlet is open, the lake becomes estuarine in nature. Most of the shoreline of Lake Powell is still undeveloped and the lake is significant in that it has experienced only minimal adverse impact from human activity. There are no permitted point source discharges to Lake Powell. It is basin-shaped, with a shallow shell, steep sandy slopes, and a flat bottom ranging from approximately 10 to 20 feet deep. Silty, high organic sediments in the water are amenable to degradation and are uniquely sensitive to pollution. Restricted flushing and the opportunity for development growth in the area add to that sensitivity. Lake Powell is a Class III waterbody. Water quality in the lake is good, and meets Class III standards; some parameters are as good as Class II standards. The low dissolved oxygen level in the lake is a result of natural conditions, is not a result of pollution, and is therefore not a violation of the Class III standard for dissolved oxygen. Lake Powell is one of the lakes in the state that is part of the water quality sampling effort known as Lake Watch. A benefit of OFW designation to this effort will be that Lake Powell, absent degradation, can serve as a control lake to compare other Lake Watch lakes throughout the State. At least 170 species of birds, (trust resources of the US Fish and Wildlife Service), have been observed and are dependent on Lake Powell. Unusual species include the piping plover (federally and state designated threatened), snowy plover (state designated threatened), least tern (state designated threatened), and bald eagle (federally designated endangered and state designated threatened). These species have a direct dependence on Lake Powell for habitat, feeding, or nesting areas. They are dependent on non-trust species such as small fishes which could be impacted by chemicals introduced to the lake. Edwin James Kepner, a biologist for the National Marine Fisheries Service, has identified three new species of nematodes which so far have been uniquely found in Lake Powell. Although nematode species are among the most abundant on earth (97,000 individuals may be found in a single rotting apple), they are a highly significant part of an ecological system and must be understood and studied for any understanding of marine communities. The lake supports a diversity of animals. At least 87 species of macrobenthic invertebrates and 67 species of fin fish inhabit the lake, a diversity based on the system's intermittent connection to the Gulf and the lake's relatively pristine condition compared to other lakes. One would expect to find even more diversity, 3 to 4 times more species, if better and more accurate sampling methods were employed. Lake Powell presents a unique nursery area, since most large predator fishes do not have access to it. The lake presently supports a variety of recreational activities, including canoeing, sailing, windsurfing, water-skiing, fishing, crabbing and picnicking. This recreational use has increased during the last five years. Lake Powell is ranked 36th out of 361 lakes statewide in a 1982 study of recreational usage. In terms of potential to the public for recreational usage, Lake Powell has three public access points to the lake, and a possible fourth. Public access is gained by a Bay County public park and by way of Gulf View Drive, which is owned by Bay County and used to launch boats. There is a public dock in Walton County which is also used extensively. The fourth access is currently the subject of an inquiry by the Bay County Audubon Society. The unusual quality of recreational experience lies in the pristine nature of the lake and the fact that it is located not far from the Miracle Strip in Panama City Beach. The ERC Commissioners, who were taken on a tour of the lake, were able to contrast the two areas and found that Lake Powell had unusual recreational value. Lake Powell provides an exceptional educational opportunity, and with its many different types of habitat it is a compact, manageable educational laboratory. As compared to the St. Andrews Bay System it would be much easier to collect samples, obtain information on biotic communities and generally conduct research on the effectiveness of regulatory programs, due to the manageable size of the lake. The proposed amendment to Rule 17-302.700(9)(i), F.A.C., to designate Lake Powell as an OFW would potentially affect future Department permit applicants by requiring they provide the Department with reasonable assurances that the proposed project is clearly in the public interest and that the proposed project would not lower existing ambient water quality standards (Rule 17-4.242, F.A.C.); by requiring that direct stormwater discharges into the lake include an additional 50% treatment level (Rule 17-25.025(9), F.A.C.); and by reducing the exemption for private residential docks from 1000 square feet to 500 square feet (Rule 17-4.04(9)(c), F.A.C.). These requirements will result in increased costs to permit applicants, although the costs cannot be calculated at this time since there are no such projects firmly proposed to the Department. The primary beneficial effect of the proposed rule would be the protection of future water quality based on existing ambient water quality standards at time of OFW designation. Pursuant to Section 120.54(2), F.S., an Economic Impact Statement (EIS) was prepared by the Department. Section 120.54(2)(b), F.S., requires the statement to include: * * * An estimate of the cost to the agency of the implementation of the proposed action, including the estimated amount of paperwork; An estimate of the cost or the economic benefit to all persons directly affected by the proposed action; An estimate of the impact of the proposed action on competition and the open market for employment, if applicable; A detailed statement of the data and method used in making each of the above estimates; and An analysis of the impact on small business as defined in the Florida Small and Minority Business Assistance Act of 1985. Additionally, Rule 17-302.700(4)(e) provides: An economic impact analysis consistent with Chapter 120, shall be prepared which provides a general analysis of the impact on growth and development including such factors as impacts on planned or potential industrial, agricultural, or other development or expansion. It is undisputed that the EIS properly addressed the costs of implementation to the Department. The EIS identified the kind of Department permit applicant that would potentially be affected by the rule amendment, and what kinds of developmental impacts could be expected by operation of other Department rules. The EIS did not identify any specific costs that would be attributable to the rule, as the Department was unaware of any specific development plans for the lake that would be subject to the Department rules. Existing development activities are grandfathered and would not be affected by the more stringent requirements. The Department stated in its EIS that the overall costs imposed on future development due to the proposed OFW designation would depend on both the nature of the development and its impact on the ambient water quality of the lake. Since the type and nature of future development in the area is uncertain, an estimate of the potential aggregate costs associated with the proposed OFW designation could not be made at the time the EIS was prepared. The EIS properly addressed the costs of the proposed rule to the parties, based upon the facts as known to the Department. The benefits to the public of the rule were stated to be largely environmental, as a result of protection of future ambient water quality standards in the lake. The EIS cited an economic benefit to land owners around the lake in the form of enhanced property values due to water quality protections of the OFW designation, water quality being an important variable in determining property values of waterfront property. That property values would be enhanced is based on the DER economist's study of another state's experience and experience with OFW designation in other Florida counties. The EIS properly addresses the benefits of the rule. The EIS states that there will be no significant effect on competition as a result of the proposed OFW designation; Petitioners have not presented any evidence to the contrary. The EIS adequately addresses the rule's effect on competition. The EIS states that the proposed OFW designation is not expected to create any significant adverse disproportionate impacts on small businesses, as required by Section 120.54(2)(b)5., F.S. As Petitioners have not introduced any evidence to the contrary, the EIS adequately addresses this issue. The EIS states that appropriate economic analysis techniques were employed preparing the EIS. Petitioners participated in the rulemaking process; they attended the Panama City workshop when economic information was solicited; they submitted written comments, none of which provided specific economic information; and they participated in the ERC hearing but offered no evidence to the Commission regarding economic impacts of the rule. The type of information they suggest that the Department should consider was not submitted by them, or anyone else, during the rulemaking process or this hearing. The evidence shows that the Department considered all comments submitted throughout the rulemaking process in making the recommendation of OFW designation to the ERC. The EIS properly explains the data and methodology used in its preparation, and this data and methodology was adequate to estimate the economic impacts of the rule. In January 1991, the Bay County Board of County Commissioners amended the County's comprehensive plan to provide special protection for Lake Powell. These provisions include more stringent requirements for stormwater retention and detention, an objective to maintain Lake Powell's water quality at its present level, restriction on use of household septic tanks, designation of a low-density residential zone, and prohibition of point source discharges which would lower existing water quality. (Joint Exhibit #1, Appendix D) Both parties have invoked the plan amendments for their own purpose. Petitioners argue that the plan amendments provide the same or greater protection than the proposed OFW designation and that the designation is not needed. This argument ignores the fact that at least 10% of the lake lies within Walton County, outside Bay County's jurisdiction. DER did not require Bay County to amend its plan and could not require it to maintain the new Lake Powell protections indefinitely. The OFW designation does not detract from or conflict with the local government's commendable initiative, but rather augments it. Respondent, DER, addresses the plan in its modified EIS where it discusses the contention by the Department of Transportation (DOT) that OFW designation will add $1.5 million in costs to widen a road at the Phillips Inlet bridge. DER's economist concedes that designation will result in additional costs and has discussed that in the EIS. Because he has not received back-up data from DOT he is unable to confirm that the cost will be as much as DOT asserts. He also attributes the increase to the new stormwater requirements of the Bay County comprehensive plan, and concludes the additional costs due to OFW designation might be zero. (Joint Exhibit #2, p. 7) Even if misplaced, the attribution of costs does not invalidate the EIS or the proposed designation. The EIS generally describes potential costs and provides a basis to weigh the environmental, social and economic costs against the environmental, social and economic benefits. In summary, the facts above support the ERC's finding that the waters selected for designation are of exceptional recreational or ecological significance and the benefits of designation outweigh its costs.
Findings Of Fact The CLDD was established pursuant to Chapter 298, Florida Statutes, on August 4, 1967. Its purpose was to "reclaim" or render the land within its boundaries usable for agricultural purposes. The land comprising the CLDD consists of approximately 3,500 acres in Lee County, mostly planted in citrus trees. Pursuant to the requirements of Chapter 298, Florida Statutes, a "Plan of Reclamation" was prepared by consulting engineers for the CLDD's Board of Supervisors in August, 1967. That plan contains provisions for reclaiming lands within the CLDD's boundaries and for managing and controlling surface water within CLDD. The method of water control outlined in the 1967 reclamation plan included a dike and ditch system around the boundaries of CLDD with a series of interior canals to carry excess water away from the citrus trees. The land in the north part of he CLDD is higher than the south and water generally, naturally flows from north to south. The interior canals were designed to carry water in accordance with existing contours of the land and eventually discharge excess surface water to the rim ditches on the north and east sides of Spoil Area "M," which is south of the CLDD and which was then owned by the C&SFFCD, the predecessor agency to SFWMD. The system of drainage delineated in that 1967 plan, inaugurated pursuant to Chapter 298, Florida Statutes, was put into effect substantially as described therein. CLDD's 1967 plan was altered somewhat because of an agreement entered into on September 30, 1971, between the CLDD and neighboring landowner Kenneth Daniels. Pursuant to that agreement, the two parties agreed to extend the dike on the west side of the CLDD property and construct a ditch from a point 50 feet north of the northwest corner of the Petitioner Mellor's property, which new ditch was to run southwest across the Daniels' property and connect with Spanish Creek. That ditch or canal would thus connect the western rim ditch of the SFWMD's Spoil Area "M" with Spanish Creek and have the result that surface waters could be discharged from CLDD lands through the western rim ditch of Spoil Area "M" thence through the "Daniels' Ditch" finally discharging into the lower reaches of Spanish Creek. (see Exhibits 1 and 11) Because the western side or western rim canal of the SFWMD's Spoil Area "M" had not been used under the original plan of reclamation approved by the C&SFFCD, CLDD sought permission from C&SFFCD to use this western rim canal for the purpose stated pursuant to the agreement with Daniels. Thus, CLDD's proposed use of the rim canal of Spoil Area "M" would be confined to the western, northern and eastern perimeter canals and not the southern boundary canal. All affected landowners, Kenneth Daniels as well a Jake and Lilly Lee, agreed to those proposed installations and uses. The resulting agreement between CLDD and C&SFFCD was entered into on October 12, 1972, and describes the flood control District land to be used by CLDD as a 100 foot wide strip running along the west, north and east sides of Spoil Area "M," also know as "Aspic." This 100 foot wide strip of land running thusly is co-extensive with the rim ditch of Spoil Area "M." The CLDD was mandated by this agreement to install 72- inch pipes in the rim ditch at the southwest corner of the spoil area, just north of the Mellor property, giving a point of discharge from the western rim ditch into the Daniels' Ditch with similar pipes connecting that Daniels' Ditch with Spanish Creek, such that the canal between these two points could carry water from the west rim ditch to Spanish Creek. The easement incorporated in this agreement was to last for five years with an option for a five-year renewal, which option was exercised. At the end of this 10-year period, SFWMD, successor to C&SFFCD, notified CLDD that because its statutory authority had since changed, the easement could not be renewed and that CLDD would have to seek the subject permit so as to be authorized to use works and lands of the District. The requirements to be met by an applicant for a right-of-way permit such as this one are set out in Rule 40E-6.301, Florida Administrative Code, and SFWMD's permitting information manual, Vol. V, Criteria Manual for Use of Works of the District, July, 1981, which is incorporated by reference in that rule. In that connection, the permit at issue, if granted, would not cause an interference with the "works" of the District, that is dikes, ditches, flood control structures arid drainage structures because it would merely renew the pre-existing authorized use. The permit will not be inconsistent with an comprehensive water use plan developed by the District. Further, the permit applicant owns or leases the land adjacent to the portion of the "works of the District" involved herein that is the east, north and west rim ditches of Spoil Area "M," the Daniels' Ditch and the pipes at either end of it coupled with the water control structures at the southeast corner and southwest corners of Spoil Area "M," which control water entering the south rim ditch. CLDD has a surface water management permit, issued in August, 1980, which is a prerequisite to the granting of the subject right-of-way permit. It remains in full force and effect. That surface water management permit authorizes "operation of a water management system serving 3,642 acres of agricultural lands by a network of canals and control structures, with a perimeter dike and canal discharging into Cypress Creek." The "surface permit" authorized the system of drainage and discharge in existence at the time of its issuance, May 8, 1980. The system of drainage, at the day of the hearing, consisted of the same basic water flow and discharge pattern that existed for approximately 10 years, and this permit would allow that to be continued, thus, there will not be any additional effect on environmentally sensitive lands occasioned by an issuance of the subject right-of-way permit. The surface water management permit, by its terms, refers initially to the operation of a water management system" . . . discharging into Cypress Creek." The reference to "Cypress Creek" was an administrative error. The express language on the face of the permit authorization incorporates by reference the application, including all plans and specifications attached thereto, as addressed by the staff report, and those materials, including the staff report, are a part of the permit. The complete permit, including all those documents incorporated by reference, makes it clear that the authorization of the surface water management permit was that the system of drainage in existence at the time of permit issuance (1980) was that which was being approved, and that included discharge to Spanish Creek and not Cypress Creek. Discharge of water to Cypress Creek as an alternative was never recommended or authorized by that surface water management permit. This is clearly the intent expressed in the permit in view of the language contained in a special condition of that surface water management permit imposed by the SFWMD as a condition for issuance which stated as follows: Within 45 days of the issuance of this permit the permittee shall submit for staff approval a proposal and schedule for the elimination of the adverse impacts being created by the operation of the permittee's water management system, which can be legally and physically accomplished by the permittee. Adverse impacts are considered herein to be reduced flows to Spanish Creek and increased flows to Cypress Creek. Thus, it is obvious that the authorization of the surface water management permit was designed to provide for discharge into Spanish Creek and to enhance the flows to Spanish Creek pursuant to a required proposal which the permittee submitted to SFWMD. Thus, the right-of-way permit applied for herein is consistent with the valid surface water management permit held by the permit applicant in this proceeding. Petitioners William H. and Patricia H. Mellor are co-owners of parcels of property lying some distance south of Spoil Area "4" in the vicinity of the Caloosahatchee River. This property does not abut the spoil area at any point. Spanish Creek does cross their property several thousand feet south of the south boundary of the spoil area. In the past, particularly in 1982, water flowing from the south rim ditch of the spoil area through a break in the dike of that south rim ditch, has flowed through a ditch known as Dry Creek in a generally southerly direction under S.R. 78 and has washed out an access road constructed by William Mellor which leads from Highway 78 to his property. He had this washout repaired at his own expense in 1982. The washout was caused by water from CLDD flowing into the south rim canal of Spoil Area "M," that is, the ditch that traverses (and defines) the southerly boundary of the spoil area. Mr. Mellor admitted, however, that SFWMD had at least partially plugged the opening in the south rim ditch which had allowed flow down the Dry Creek ditch and wash out his road. If closed water control structures are maintained at the southwest and southeast corners of the spoil area ditches, then no water could flow into the south rim canal and no such injury could again be caused. Petitioner's Jim English and Patricia Mellor are co-owners of a 45- acre parcel of land located in the southwest corner of Spoil Area "M." The five acres forming the extreme southwest corner of the spoil area do not belong to these Petitioners, but are owned by one Lynwood Brown, who is not a party to this proceeding. The English/Mellor property forms a part of the spoil area, but does not adjoin or constitute any part of the spoil area which is sought to be used by CLDD through the proposed right-of-way use permit (as clarified by CLDD's stipulation). The south rim ditch, either part of, or adjoined by their property, has been used for water storage in the past (they maintain illegally) 1/ Mr. Tom Pancoast has observed Spanish Creek frequently over a nine- year period starting in approximately 1973. He has often used those waters during that period for fishing. During the early years of his use and observation of Spanish Creek, the water flowed out of Spanish Creek into the Caloosahatchee River. Beginning in about 1976, the water appeared to be flowing in the opposite direction, from the river into Spanish Creek. Contemporaneous with this hydrologic change, the creek has become increasingly characterized by siltation and hyacinth growth. Mr. William Mellor owns property along the course of Spanish Creek. He has used the stream for recreational purposes, picnicking where the stream traverses his property. In recent years there has occurred a marked increase in the growth or profusion of aquatic plants of unidentified types in the creek, reduced clarity and reduced flows or volumes of water in the creek. Witness English has made a similar observation. Witness James English has a substantial degree of training by formal education and experience in water management and drainage practices and methods, particularly as they relate to citrus grove development and management in southwest Florida. Mr. English has observed Spanish Creek regularly for most of his life, including the region of its headwaters in the "Cow Prairie Cypress," a remnant wetland cypress strand lying within the CLDD immediately north of Soil Area "M." The chief adverse impact of the CLDD water management system is reduced flow to Spanish Creek, especially its upper reaches since the advent of the "Daniels' Ditch" as a drainage route and discharge point into lower Spanish Creek. However, the only special condition on the issuance of the surface water management permit approving CLDD's extant water management system was the requirement that CLDD should submit a plan for eliminating that adverse effect, which it did (as Petitioner English admits). Beyond the submission of such a plan, no concrete action designed to restore historic flows to Spanish Creek has yet begun, however. The restoration of historic flows, adequate in volume and quality, to the entire creek system would require discharging water from CLDD's system to the Cow Prairie Cypress area at the headwaters of the creek rather than substantially further downstream at the present Daniels' Ditch site. The Petitioners' complaints (aside from the issue of adequacy of flows in Spanish Creek), although meritorious, are, because of stipulations asserted by CLDD during the course of this proceeding, now rendered moot. CLDD stipulated that it only seeks a permit to use the west, north and eastern spoil area ditches. It does not seek and stipulated that it will not use, at any time, the south rim ditch and will maintain water control structures so to block water from entering that ditch. This will alleviate the problem of potential storage of water on Petitioners English and Patricia Mellor's property and the erosion problem on Petitioners William and Patricia Mellor's property south of the spoil area. It was thus established that the issuance of the right-of-way permit will not cause the injuries these Petitioners have suffered in the past because of use of the south rim ditch for water drainage and storage.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence in the record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED: That the South Florida Water Management District grant the County Line Drainage District's application for a permit for utilization of works and lands of the District. Subject to the following special condition: Issuance of this right-of-way permit does not relieve the Respondent CLDD from the responsibility of complying with special condition number 1 of the surface water management permit number 36-00184-S. Respondent CLDD shall, within 30 days of date of permitting, submit a design to the satisfaction of the SFWMD staff which will prevent the ability of CLDD to discharge to the southern rim ditch, described above. DONE and ENTERED this 29th day of September, 1983, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 1983.
Findings Of Fact Based upon the oral and documentary evidence adduced at the final hearing and the entire record in this proceeding, the following findings of fact are made: The SFWMD is a public corporation in the state of Florida existing by virtue of Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 573, Fla. Stat., and Title 40E, Fla. Admin. Code, as a multi-purpose water management district, with its principal office in West Palm Beach, Florida. The Navy has proposed construction of a naval housing facility on the Peary Court site (the "Site") in Key West, Florida. The Site is approximately 25.89 acres and will provide 160 housing units for junior enlisted Navy and Air Force personnel and their families. The Site is the center of a larger, 37 acre drainage basin. The Site was formerly the location of military housing. However, for the past 18 years, the Site had been used by the City of Key West, with the assent of the Navy, for active and passive recreation for city residents. The Site contains a cemetery of historic value and a former military housing structure now being used by the Navy Key West Federal Credit Union with an associated parking area of paved asphalt. On February 6, 1992, the Navy submitted an application for a Surface Water Management District General Permit for the Project. The proposed surface water management system (the "System") was designed by Rice Creekmore, a registered professional engineer, and his company Johnson, Creekmore, and Fabray. The proposed System utilizes the existing topography and incorporates a number of drainage control mechanisms to manage the run-off from the Site. The System employs inlets, swales and culverts to direct stormwater run-off into dry detention areas (ponds) for pretreatment prior to discharging into seven 24-inch Class V injection wells (drainage wells). As discussed below, these injection wells must be permitted by the Florida Department of Environmental Regulation ("FDER"). The dry pond areas utilize key ditches, bottom elevation 1.0' NGVD, in order to hydraulically connect all of the dry pond areas together into one dry system prior to overflowing into the drainage wells beginning at elevation 1.5' NGVD. In other words, the detention ponds are interconnected with pipes. The design includes only one point where run-off would be discharged from the Site during any storm equal to a 25 year, three day storm event. That discharge would occur at the lowest point of the Site at the corner of Eisenhower and Palm. The water would be discharged through a V notch weir (the "Weir") into the City's stormwater system. An existing 12" storm drain line at the discharge point will be replaced by a 13.5" by 22.0" Reinforced Concrete Elliptical Pipe culvert. As discussed in more detail below, the System is designed so as to detain 1" of run-off within the dry detention ponds prior to any discharge through the Weir. After review of the application and submittals, the SFWMD issued a Notice of Intent to issue General Permit and Stormwater Discharge Certification No. 44-00178-S (the "Permit") on September 29, 1992. Petitioner and Intervenor timely petitioned for an administrative hearing challenging the SFWMD decision to award the Permit. There is no dispute as to the standing of either Petitioner or Intervenor. The SFWMD has adopted rules that set forth the criteria which an applicant must satisfy in order for a surface water management permit to issue. The criteria are set forth in Rule 40E-4, Florida Administrative Code. Rule 40E-4.301(1)(m) and 40E-4.091(1)(a) incorporate by reference The Basis of Review for Surface Water Management Permit Applications within South Florida Water Management District - April, 1987, ("The Basis for Review"). The Basis for Review explicates certain procedures and information used by the SFWMD staff in reviewing a surface water management permit application. The SFWMD issues general permits for projects of 40 acres or less that meet specific criteria. All other projects must obtain individual permits which are reviewed by the District Board. The specific rules relating only to general permits are set forth in Rule 40E-40. In addition, the Basis for Review sets forth certain technical requirements which must be met for the issuance of a general permit including general construction requirements and special requirements for wetlands. The Basis for Review also sets forth criteria for how a proposed system should address water quantity and water quality issues. The SFWMD assumes that water quantity and water quality standards will be met if a system satisfies the criteria set forth in the Basis for Review. Water Quantity Criteria Rule 40E-4.301(a), Florida Administrative Code, requires an applicant to provide reasonable assurances that a surface water management system will provide adequate flood protection and drainage. The purpose of the water quantity criteria is to insure that pre- development flows and post-development flows are equal. The SFWMD requires calculations of a project's projected post-development flow to guarantee that the post-development discharge rate will not be in excess of the pre-development discharge rate. These calculations are based on a 25 year, 3 day storm event. There is no stormwater management system in place at the Project Site. The pre-development topography results in a pre-development discharge point from the Site at the corner of Eisenhower Drive and Palm Avenue. At this point, a discharge or outfall pipe leads into the City of Key West's stormwater management system. The City's system ultimately discharge into Garrison Bight, a nearly waterbody which is discussed in more detail below. At the time the Navy began planning for the Project, the Navy was told that the discharge pipe had a capacity of accepting water at a rate of 40 cubic feet per second ("CFS"). The Navy initially designed a system to utilize this capacity. Subsequently, it was discovered that, due to the size of the pipe at the discharge point and the capacity of the pipes downstream in the City of Key West's stormwater management system, the City would not allow or accommodate a discharge of more than 11 CFS from the Site. Thus, the System had to be redesigned so that the discharge to the City's system would not exceed 11 CFS. The system was redesigned to incorporate the seven (7) Class V injection wells. The injection wells are intended to insure that discharge from the Project into the City stormwater system through the surface water discharge pipe at Eisenhower Drive and Palm Avenue will not exceed 11 CFS. The injection wells introduce treated stormwater into the ground before it reaches the discharge point. The pre-development rate of surface water discharge from Peary Court in a 25 year, 72 hour storm event was 55 CFS. This rate was calculated based upon a site survey, a determination of the existing amount of pervious versus impervious surface area, and a calculation made through a generally accepted civil-engineering computer program. 1/ This predevelopment discharge is the amount of water which would be expected to discharge off-site after percolation occurs. The number and size of the injection wells for the proposed system were determined based upon tests of an on-site twelve-inch fire well. The results of the tests revealed that the on-site test well could manage in excess of 2 CFS. Due to test limitations, the exact capacity could not be measured, but the capacity was clearly more than 2 CFS. These results were then compared with data obtained from the engineering firm of Post, Buckeley, Schuh & Jernigan for installed wells in the Florida Keys of a similar nature and size to the wells in the proposed surface water management system. The Post, Buckeley test results indicated that 24-inch wells had a capacity of 31 CFS. In addition, the design engineer consulted with South Florida Well Drillers, who have drilled other wells in the Florida Keys including 24-inch wells at the Key West airport which were completed shortly before the application for this Project. South Florida Well drillers found the capacity of 24-inch wells in Key West to be in the 25 to 30 CFS range. Based upon the results of the test well and the related reports described above, the project engineer based his design of the surface water management system on an estimated well capacity of 8.4 CFS for each well. These estimates were submitted by the Navy in its application and were appropriately determined to be reasonable by the SFWMD staff. Indeed, the evidence established that 8.4 CFS was a conservative estimate. The seven injection wells, at an estimated capacity of approximately 8.4 CFS each, provide in excess of 56 CFS of well discharge capacity, which is beyond the necessary discharge volume for the Project. Limiting Condition No. 13 of the Permit requires the Navy to obtain a well capacity test from a Florida Registered Professional Engineer or Professional Geologist following the installation of the first Class V injection well at the Site. If the results of this test indicate that the capacity of the well is different than that submitted by the Navy in its application, the Navy must apply for a permit modification to provide a design which incorporates a representative injection well flow-rate and an appropriate number of wells for the Site. In view of the reasonableness of the capacity rates utilized for the wells, it is unlikely that the results of the capacity test will result in any major design change in the proposed surface water management system. The use of the injection wells in the proposed surface water management system will significantly reduce the amount of run-off which would otherwise reach Garrison Bight from the Site. After the System is completed, it is expected that the amount of run-off from the Site that will reach Garrison Bight will be only 20 percent of the predevelopment amount. In addition, because there has previously been no management of the run-off from the Site and surrounding areas, there has been a frequent flooding problem at the corner of Eisenhower Drive and Palm Avenue after heavy rain storms. The proposed surface water management system will accommodate the overflow of water which historically occurred when discharges from Peary Court and the surrounding areas could not be accommodated by the Key West storm water management system. Petitioner and Intervenor suggest that the effect of tidal flow on the capacity of the wells was not fully considered. The evidence established that the design engineer considered normal high tides in calculating groundwater elevations. Respondent's engineering experts have concluded that the proposed surface water management system is effectively designed to accommodate the Florida Keys' tidal flows. Petitioner and Intervenor offered no expert testimony to refute this conclusion and/or to establish that the tides would impact the effectiveness of the proposed surface water management system. In the event that an extremely high tide occurs at the time of a storm, the detention ponds may hold standing water for a short time. This water would not be discharged off-site. There is no evidence that tidal influences would in any way adversely affect the System's ability to uptake pollutants in the "first- flush". The Class V shallow injection wells are an integral part of the proposed Peary Court surface water management system. Without the injection wells it is not clear whether the Project could meet the SFWMD water quantity criteria. The SFWMD does not have authority to permit Class V injection wells. FDER must permit those wells. The Peary Court site is not the first Florida Keys' project permitted by the SFWMD which utilizes injection wells. The surface water management permits for the other projects were issued contingent upon obtaining the necessary permits for the injection wells. Special Condition No. 14 of the Permit provides that the Permit is conditioned on the Applicant obtaining the applicable permits from FDER for the injection wells. During the interim while the Navy is seeking the FDER permits, it should be required to retain all run-off on-site. If the Navy is not able to obtain the necessary FDER permits for the injection wells, the Navy should be required to either retain all run-off on-site or propose an alternate design to meet the SFWMD's water quantity requirements. A modified permit application with a new Notice of Intent should be required for any alternate design. The following Special Condition Number 14 was offered by the SFWMD at the hearing (language revised from original condition is highlighted and underlined): THIS PERMIT IS ISSUED BASED ON THE APPLICANT OBTAINING THE NECESSARY CLASS V INJECTION WELL PERMITS FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION (FDER). THE PERMITTEE SHALL SUBMIT AN APPROVED CLASS V DRAINAGE WELL PERMIT FROM FDER PRIOR TO OPERATION OF THE SURFACE WATER MANAGEMENT SYSTEM. IN THE INTERIM, THE PERMITTEE SHALL CERTIFY TO THE DISTRICT THAT NO OFF-SITE DISCHARGE WILL OCCUR UNTIL THE APPROVED CLASS V DRAINAGE WELLS ARE IN OPERATION. IF THE SURFACE WATER MANAGEMENT SYSTEM DESIGN MUST BE MODIFIED AS A RESULT OF FDER REQUIREMENTS OR IF THE CLASS V INJECTION WELL PERMITS ARE NOT ISSUED, THE APPLICANT SHALL APPLY FOR A PERMIT MODIFICATION TO PROVIDE A SURFACE WATER MANAGEMENT SYSTEM DESIGN WHICH SHALL MEET DISTRICT CRITERIA IN EFFECT AT THAT TIME. The proposed additional language requires the Navy to certify that no off-site discharges will occur until the injection wells are permitted and are operating. This revised language should be added to Special Condition No. 14 to clarify that the injection wells must be in operation prior to any off-site discharge from the surface water management system. Maintenance of the surface water management system entails upkeep of the dry detention areas and routine grass cutting, as well as inspection of the injection wells on a periodic basis to guard against clogging and reduced capacity. The system is essentially designed to operate without direct surveillance or intervention. Injection wells do not require any additional maintenance over and above that which is routinely required for other types of surface water management systems. The injection wells will require routine maintenance to ensure that manholes and inlets do not become clogged. Limiting Condition No. 8 of the Permit requires that the surface water management system, including the injection wells, be maintained. At the hearing, the SFWMD proposed that a condition be added to the Permit to further clarify the maintenance requirements. A condition requiring long-term maintenance would be desirable and reasonable. A new special condition should be added to the Permit requiring long-term maintenance of grass swales and inspections of injection wells for clogging. Acceptable language for such a condition would be: SPECIAL CONDITION NO. 15 The permittee shall provide long-term maintenance of the surface water management system, encompassing the injection wells, including, but not limited to, (a) maintenance of the vegetation in the grass swales and detention ponds and (b) routine inspections of wells and discharge structures for clogging. Water Quality Criteria As noted above, there is no designed system for surface water management and/or water quality pretreatment at the Site in its undeveloped state. Surface water run-off that can not be managed by the City of Key West's storm water management system collects in roads adjacent to the Site, resulting in adverse water quality and quantity impacts to adjacent land and receiving waters. The applicable water quality criteria, contained in Rule 40E-4.301, Florida Administrative Code, require an applicant to provide reasonable assurances that a surface water management system will not cause adverse water quality impacts to receiving waters and adjacent lands, and will not cause discharge which results in any violation of the standards and criteria of Chapter 17-302 for surface waters of the state. Rule 40E-4.301 provides that: In order to obtain a permit under this chapter, an applicant must give reasonable assurances that the surface water management system is consistent with the State Water Policy as set forth in Chapter 17-40, Florida Administrative Code (40E-4.301(1)(h), Florida Administrative Code. Rule 17-40.420 provides in pertinent part: Minimum Stormwater Treatment Performance Standards. When a stormwater management system complies with rules establishing the design and performance criteria for stormwater management systems, there shall be a rebuttable presumption that such systems will comply with state water quality standards. The Department and the Districts, pursuant to Section 373.436, Florida Statutes, shall adopt rules that specify design and performance criteria for new stormwater management systems which: 1. Shall be designed to achieve at least 80 percent reduction of the average annual load of pollutants that would cause or contribute to violations of state water quality standards. The Basis for Review, which is incorporated into Title 40E, Florida Administrative Code, by reference, further delineates the applicable water quality permit criteria for surface water management systems. Regarding water quality criteria, the Basis for Review provides: 3.2.2.1 State standards - Projects shall be designed so that discharges will meet state water quality standards, as set forth in Chapter 17-3 [revised to 17-302], Florida Administrative Code. The SFWMD's water quality criteria do not require chemical testing of stormwater for residential projects. The SFWMD's water quality criteria require that the design of a surface water management system meet applicable design/technology based criteria. Section 3.2.2.2 of the Basis for Review contains the specific water quality criteria for the design of a surface water management system. The SFWMD allows applicants to design their surface water management system using either dry or wet detention or dry or wet retention, so long as the treatment provided by the system meets water quality and quantity criteria. Dry detention consists of a system of grass swales and vegetative- covered ponds which detain water at a predetermined rate prior to off-site discharge. Wet retention can contain canals, ditches, lakes or ponds to retain water on-site. If a system is designed to meet the criteria specified in 3.2.2.2(a) of the Basis for Review and incorporates Best Management Practices ("BMP's") for the type of system proposed, the SFWMD presumes that water quality standards will not be violated. In determining which system is appropriate for a particular site, water quantity (flooding impacts) and water quality impacts must be balanced. In some cases, water quantity concerns may preclude certain types of water quality treatment methods. At the hearing in this case, Petitioner and Intervenor suggested that retention is superior to detention in designing surface water management systems. The evidence presented in this case was insufficient to support this conclusion. In any event, this contention focuses only on water quality considerations. One drawback to retention is that it may have on-site flooding impacts. With respect to this Project, the evidence indicates that retention may not have been an acceptable alternative because of possible adverse water quantity impacts. The Navy's proposed surface water management system was designed to utilize dry detention with filtration for treatment of surface water prior to discharge into the injection wells and/or off-site. The design uses a system of grass swales and grass-covered detention ponds to detain and filter pollutants from the surface water as it makes its way through the dry detention system. The System is designed to utilize as many grass swale areas as possible to filter or treat the surface water before it reaches the detention ponds which provide further treatment. The swales restrict the flow of water to approxmiately one half to one foot per second which allows for percolation and a tremendous amount of filtration. The System utilizes the natural topography of the Site to direct water through the dry detention system to the lowest point of the Site at the corner of Eisenhower Drive and Palm Avenue. Any water which makes it to this last detention pond and is not drained into one of the injection wells can flow through the discharge structure (the Weir) at 11 CFS and ultimately make it into Garrison Bight. Petitioner and Intervenor have suggested that the design of the proposed System is defective because water discharged from the cul-de-sacs in the Project design will flow directly into detention ponds without passing over any of the grass swales. The permit criteria do not specify that all surface water must contact grass swales prior to reaching a detention pond. While greater filtration is achieved the longer the run-off remains in the system, the evidence established that the detention ponds by themselves provide sufficient water quality treatment. With respect to all but one of the cul-de-sacs, the water must pass through at least two detention ponds before it is discharged. Run-off from the cul-de-sac closest to the Weir will receive treatment only in the last discharge pond. Petitioner and Intervenor questioned whether the run- off from this last cul-de-sac will receive adequate treatment, in other words, whether the "first flush" will be adequately detained prior to discharge, especially in circumstances when the detention pond is already wet. However, the evidence was insufficient to establish that their concerns are justified and/or that this situation would constitute a violation of water quality standards. This cul-de-sac is only 100 ft in diameter and accounts for no more than 8 percent of the total run-off from the Site. After considering all of the evidence, it is concluded that the water from the cul-de-sacs will be adequately treated in accordance with the permit criteria prior to any discharge. In assessing the Navy's proposed surface water management system the following criteria from the Basis for Review are pertinent in determining whether the proposed System will provide appropriate water quality treatment: 3.2.2.2 Retention and/or detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided for one of the three following criteria or equivalent combinations thereof. . .: Wet detention volume shall be provided for the first inch of run-off from the developed project, or the total run-off of 2.5 inches times the percentage of imperviousness, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. If the receiving waterbody, is a "sensitive receiving water," which would include an Outstanding Florida Water, the following additional criteria regarding direct discharges are applicable: 3.2.2.2 d. Projects having greater than 40 percent impervious area and which discharge directly to sensitive receiving waters shall provide at least one half inch of dry detention or retention pretreatment as part of the required retention/detention. The SFWMD interprets the permitting criteria as creating a rebuttable presumption that a surface water management system that provides detention in accordance with BMP's of the first inch (1") of run-off from a Site, commonly referred to as the "first-flush", will meet state water quality standards. The "first-flush" occurs at the onset of a rainfall when most pollutants run off paved areas and percolate into the grass swales. It is an accepted design parameter that the "first flush" contains 90 percent of the pollutants which will be collected in the run-off. The 90 percent of the pollutants in the first flush are consequently retained on-site through pure percolation and never reach the discharge facility. Although Petitioner and Intervenor suggest that dry detention does not provide this degree of filtration, the evidence was insufficient to support this contention. The proposed System for this Project provides treatment for the first one inch (1") of run-off from the developed Project, thereby meeting the permitting criteria for sensitive receiving waters. Intervenor and Petitioner contend that the development of this Project will necessarily result in a larger amount of pollutants in the run-off from the Site. They argue that the Applicant has not provided reasonable assurances that capturing 90 percent of the increased level of pollutants in the first flush will meet water quality standards. As noted above, compliance with the permit criteria creates a rebuttable presumption that water quality standards will be met. Insufficient evidence was presented to overcome this rebuttable presumption. In calculating the appropriate volume for the dry detention ponds, the Project engineer used the Site's percentage of impervious area. The percentage of impervious area was determined in accordance with SFWMD criteria. The calculations do not account for any percolation from the impervious areas even though much of that run-off will pass through swales and other grassy areas of the Site. In addition, there is a built-in buffer between the berm elevation around the ponds and the expected water level in the ponds. These factors confirm that there is significant additional capacity in the ponds which is an overage or safety net. In sizing the detention ponds, the project engineer also factored in additional off-site water that will be coming on-site from Palm Avenue. This water currently ponds on Palm Avenue contributing to a recurring flooding problem in the area. This off-site water will be routed through an inlet and pumped directly into on-site detention areas thereby reducing flooding on Palm Avenue and providing some treatment for off-site run-off that was not previously treated before entering the City's stormwater system. As noted above, additional water quality criteria requirements apply to projects which discharge to an Outstanding Florida Water. These additional criteria are set forth in paragraph 40 above. Outstanding Florida Water or OFW is the designation given exclusively by the FDER to certain waterbodies in Florida which have special significance, either for ecological or recreational reasons. Outstanding Florida Waters are afforded the highest degree of water quality protection. The criteria for designation of waters as Outstanding Florida Waters is found in Chapter 17-302, Florida Administrative Code. When the SFWMD initially reviewed the Permit application for this Project, it erroneously assumed that Garrison Bight, the ultimate receiving body for the waters discharged from the project through the City stormwater system, was an OFW. Although the SFWMD applied water quality criteria for OFW's when it reviewed the subject permit application, the evidence at the hearing in this case established that Garrison Bight is not an Outstanding Florida Water. A FDER representative, qualified as an expert in the designation of Outstanding Florida Waters, testified that the Outstanding Florida Water designation does not apply to certain waterbodies that were degraded at the time of designation or did not have the significance or pristine water quality that merit special protection. The designation also does not apply to artificial waterbodies. Artificial waterbodies are defined in Rule 17-302.700(9)(i), Florida Administrative Code, as a waterbody created by dredging or excavation or by the filing in of its boundaries on at least two sides. The FDER has formally determined that Garrison Bight is not an Outstanding Florida Water because Garrison Bight is an artificial waterbody in accordance with the definition. Furthermore, Garrison Bight is the site of extensive boating and marina activities. The water quality of Garrison Bight is currently degraded in comparison to ambient conditions and offshore/unconfined water. In sum, the evidence established that proposed surface water management system meets or exceeds the current permit criteria. Consequently, the water flowing into Garrison Bight from the Site will be significantly less and much cleaner after the proposed surface water management system is installed than it currently is without a designed surface water management system.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered approving the issuance of Surface Water Management General Permit No. 44-01785 in accordance with the Notice of Intent dated September 29, 1992 and the additional conditions noted in this Recommended Order. DONE AND ENTERED this 14th day of May, 1993, at Tallahassee, Florida. J. STEPHEN MENTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of May, 1993.
Findings Of Fact The Respondent is a multi-county water management district which was created by Chapter 25270, Laws of Florida, 1949, and which operates pursuant to the provisions of Chapter 373, Florida Statutes. The District is the local sponsor for the federally-authorized "Central and Southern Florida Project for Flood Control" and as such, operates and maintains various water control facilities and impoundments in South Florida, as authorized and constructed by the Federal Government. The jurisdiction of the District encompasses 16 counties in southern and central Florida, from Marion County in the north to Monroe County in the south. Water Conservation Area 2A is one of several water conservation areas within Respondent's jurisdiction and is a part of the federally-authorized Central and Southern Florida Project for Flood Control. On April 13, June 2, August 10, September 26, October 19, and October 20, 1978, the Governing Board of the District held public hearings and workshop meetings to receive comments from the District staff and the general public concerning the proposed "draw down" or alteration of water levels in Water Conservation Area 2A. Notice of the September 26, 1978 public hearing was published in the Florida Administrative Weekly, Volume No. 4, No. 36, on September 8, 1978. By the terms of the notice, the purpose of the September 26th public hearing was: To provide interested citizens with an opportunity to express their opinions and hear testimony regarding the District's proposal to lower the water level in Conservation Area 2A, located in western Palm Beach and Broward counties. The purpose of the draw down is to con- solidate the bottom sediments so that a more flexible water schedule can be begun to preserve the natural Everglades ecology . . . . After considering information received from staff and the general public, the Governing Board entered its "Order" No. 78-12 dated October 20, 1978 containing findings of fact and conclusions of law. This "order" provided, in pertinent part: That the staff take appropriate measures to accomplish the following: A draw down from current high water levels will be initiated October 31, 1978, with the goal of reducing water levels in the central portion of the marsh to ground level by December 31 (about 11.2 feet msl). From this point, water levels shall be allowed to continue to recede to a minimum level of 9.5' by the end of May, 1979. Water levels will be allowed to rise to about 12.5' msl by October 31, 1979. That the staff take appropriate measures to regulate water levels in Conservation Area 2A between 12.5' and 9.5' msl as provided in Paragraph 1. until November of 1981. That the regulation of Conservation Area 2A be carried out in a flexible manner to insure maximum environmental benefits and that adjustments in water level fluctuations and stages may be made predicated upon the environmental response of the Conservation Area 2A ecosystem resulting from the previous year's hydroperiod. That the staff pursue such research and data collection as is necessary to fully document the conditions of the marsh throughout the three year duration of the project. No formal hearings pursuant to Section 120.57(1), Florida Statutes, were requested as a result of the aforementioned workshop, public hearings or agency action embodied in the "order" of October 20, 1978. It is undisputed that Respondent did not comply with the requirements of Section 120.54, Florida Statutes, relating to rule making in issuing its Order of October 20, 1978. Petitioner, Joe Burgess, is the owner of Hinckle's Bait and Tackle Shop on State Road 84 in Broward County, approximately 12 miles from Conservation Area 2A. Petitioner Burgess derives approximately 60 to 70 percent of his business from customers who use Conservation Area 2A for hunting, fishing, and other recreational purposes. In addition, Petitioner Burgess personally uses Conservation Area 2A for hunting and fishing. Petitioner, Keith Finlayson, is an environmentalist who uses Conservation Area 2A for recreational purposes, including fishing, bird watching, observing animals in their natural habitats and flora identification. Petitioner Finalyson uses Conservation Area 2A for recreational purposes approximately two to three times per week. Petitioner, Concerned Citizens for the Everglades, Inc., is a not-for- profit Florida corporation, some of whose members presently use Conservation Area 2A for hunting, fishing, and other recreational purposes. Other members of the organization derive their living from businesses supported by revenues obtained from the general public directly attributable to "use" of Conservation Area 2A. One of the effects of the "draw down" will be to make certain portions of Conservation Area 2A inaccessible by boat during some periods of the year, thereby curtailing recreational and other use of the those areas. Water Conservation Area 2A, and other such areas within the jurisdiction of Respondent, is surrounded by levies and various water control structures and is operated independently of other water conservation areas, which are also surrounded by levies and water control structures. All of the water conservation areas within Respondent's jurisdiction are subject to different and independent water regulation schedules. The evidence establishes that it is not feasible to apply the same regulation schedule to all water conservation areas due to differences in topography. In fact, it is anticipated that a different regulation schedule for Water Conservation Area 2A will be developed after the current three-year draw down period is concluded. Although originally scheduled to commence on November 1, 1978, the "draw down" of water levels in Conservation Area 2A was delayed as a result of legal actions taken in state courts. As a result, the District did not actually begin the "draw down" until August, 1980.
The Issue The issues for determination in this case are: 1) whether the Department of Environmental Protection (DEP) has dredge and fill permitting jurisdiction over a certain body of water known as Lake Blake in Okaloosa County, Florida; 2) if DEP's dredge and fill permitting jurisdiction is established, whether Petitioner qualifies for an exemption from DEP's dredge and fill permitting jurisdiction; and 3) if not otherwise exempt from DEP's dredge and fill permitting jurisdiction, whether Petitioner's application No. 46-0199306-001-EE, seeking to place a modular home on a fill pad in Lake Blake, should be approved by DEP.
Findings Of Fact Parties DEP is the agency of the State of Florida vested with the power and duty to enforce the provisions of Chapters 373 and 403, and the rules promulgated in Chapter 62, Florida Administrative Code. DEP is the only agency involved in these proceedings. Lee Maddan (Maddan) is a long-time resident of Okaloosa County, and the Petitioner in Case No. 03-1499. Maddan is a Respondent in Case No. 03-2040. Maddan has personally observed activities occurring at the Lake Blake property for more than 38 years, including the excavation of the lake. Santa Rosa Three, Inc. (the Corporation), is a Respondent in Case No. 03-2040, and holds fee simple title to the property containing Lake Blake, which is located in unincorporated Okaloosa County between Lewis Street and Clifford Street in Sections 2 and 3, Township 2 South, Range West. Santa Rosa II is also Respondent in Case No. 03-2040, and is a corporate predecessor in interest to the Corporation. Maddan holds equitable title to the Lake Blake property and is in the process of purchasing the fee simple title to the property from the Corporation. Maddan is and was at all material times hereto authorized by the Corporation to enter upon the Lake Blake property, to proceed to develop the land, to obtain permits in his name and to do other acts to prepare the property for Maddan's purchase. History of Lake Blake Lake Blake is an artificially created water body in unincorporated Okaloosa County, having a water surface area slightly less than six acres. There is a small island in the center of the lake. The property surrounding Lake Blake presently consists of both uplands and wetlands. No other water body is visible from Lake Blake. For DEP jurisdictional determination purposes, Lake Blake is located in the Northwest District of Florida. The oldest records of the Lake Blake property dating to 1826, indicate that the property was flat land with natural vegetation dominated by palmetto and galberry. The property historically had no flowing streams. In the 1950's the then owner of the property began excavating a borrow pit on the property. The excavations continued until approximately 1979. As the borrow pit excavations continued a lake formed due to the intrusion of underground water as well as collected rainfall. During the excavation period, and until approximately 1976, the land around the borrow pit was primarily pasture land with no trees or other vegetation. Up to 1976, there was no wetland vegetation growing on the property. Prior to 1960, the natural stormwater flow from the property was to the southwest toward Cinco Bayou, a defined water body of the State of Florida which on a direct line is located approximately one-quarter mile from the property. Cinco Bayou is the body of water of the State nearest to Lake Blake. During the 1960's, a road known as Lewis Street (also known as Mayflower Avenue) was constructed along the southern boundary of the property. At the time of the construction of Lewis Street, the borrow pit was separated into two parts, an eastern and western section. A concrete culvert divided the sections of the borrow pit. At the time of the Lewis Street construction, a stormwater discharge pipe was installed by Okaloosa County and excess water flowed out of the borrow pit only at certain times in direct response to rainfall. The installation of the stormwater discharge pipe on Lewis Street was intended to drain excess rainfall from the borrow pit. Okaloosa County never acquired ownership of the borrow pit for use as a stormwater retention pond. The water body that formed in the borrow pit would come to be called Lewis Street Pond, or Blake Lake, and eventually Lake Blake. The natural flow of the stormwater from the property was further altered in the 1970's when a public elementary school was constructed by Okaloosa County on Lewis Street. The public school is located between the property and Cinco Bayou. Borrow pit operations formally ceased in September of 1980 when DEP's predecessor agency, the Department of Environmental Regulation (DER), entered an order requiring the cessation of mining operations. The physical operations had actually ceased a few years before the DER order. Lake Blake originally resulted from collected rainfall, as well as underground water intrusion in the borrow pit. Over the subsequent years and at the present time, additional diverted stormwater runoff collected in the lake as a result of Okaloosa County's stormwater drainage system. Lake Blake today is an artificial body of water owned entirely by one person. Residential housing is located on property surrounding Lake Blake. The lake is occasionally utilized for recreational purposes, including fishing. The property surrounding the lake is not open to the general public, and the entrances to the property are fenced. For purposes of this proceeding, there are no threatened or endangered plants on the property. Okaloosa County Stormwater Drainage System Okaloosa County has constructed a stormwater drainage system that runs through the Lake Blake drainage area. As part of this stormwater drainage system, Lake Blake collects diverted stormwater discharge from surrounding areas which have been previously developed. Residential neighborhoods are close to the area, specifically the Berkshire Woods Subdivision. Indeed, as a condition for the development of the Berkshire Woods Subdivision in 1976, the Okaloosa County Planning Commission required that a former owner of the property, Ron Blake, excavate the lake and have it made ready for stormwater drainage from the proposed development of the Berkshire Woods Subdivision. In addition to the residential areas and the public school to the south, there is a private school to the north across the road on Clifford Street which also diverts water to the lake from its campus and parking lots Okaloosa County has installed several pipes which carry stormwater from the surrounding developed areas into Lake Blake. The only drainage out of Lake Blake is via the stormwater discharge pipe located at the southern boundary of the property on Lewis Street which was installed by Okaloosa County in the 1960's. Okaloosa County's stormwater discharge system serving Lake Blake is integrated into a series of interconnecting underground stormwater pipes which route the flow of the water for approximately one-half mile before ultimately discharging water into Cinco Bayou. Okaloosa County's stormwater discharge system which ultimately connects Lake Blake with Cinco Bayou is composed of buried pipes. DEP considers buried pipes or culverts which convey stormwater as excavated water bodies. The installation of Okaloosa County's stormwater discharge system required the excavation of land. Under DEP's interpretation of its rules, specifically Rule 62-312.030(2), Florida Administrative Code, the underground installation of stormwater pipes is sufficient to establish a series of excavated water bodies which connect Lake Blake to Cinco Bayou. Prior to the installation of Okaloosa County's stormwater discharge pipe on Lewis Street in the 1960's, there was no dredge and fill permitting jurisdiction which applied to the property containing Lake Blake. The stormwater discharge pipe has continuously existed on the southern boundary of the property since its installation in the 1960's to the present. Lake Blake was not originally designed, constructed, nor permitted as a stormwater treatment or retention pond. Lake Blake incidentally resulted from the borrow pit excavations. Okaloosa County, however, has at least since 1976 utilized Lake Blake as part of its stormwater drainage system. Okaloosa County never acquired title to Lake Blake. In 1981, the Okaloosa County Board of Commissioners (who were not the owners of the property) applied for, and were issued by DER, a Construction Permit (No. RC-46-80-2031, dated May 27, 1981, which expired November 27, 1981), for "Blake Lake Modifications," which permit stated it was "to modify an existing stormwater drainage system." This permit allowed for, among other items, construction of "two earthen berms in Blake Lake" and "the diversion of lake flow from the western lake to the eastern lake." Although attempts were made to construct the two earthen berms, due to the white clay composition of the soil the berms were not successfully established. In 1984 DER issued another Construction Permit (No. 460853421 dated August 20, 1984, which expired August 15, 1987) to the Okaloosa County Board of Commissioners (who again were not the owners of the property) for the purpose constructing "two drainage channels . . . from a berm separating East and West Blake Lake." The drainage channels were thereafter completed and the east and west portions of the lake were eventually connected. On August 14, 1984, Okaloosa County also filed a Notice of New Stormwater Discharge with DER which proposed a re-routing of an existing stormwater drainage system which then diverted stormwater from the Candlewood Subdivision and Navy Street into Lake Blake. The stated purpose of the re-routing of the stormwater drainage system away from Lake Blake was to address flooding problems in the Candlewood Subdivision. By letter dated August 21, 1984, DER informed Okaloosa County that "the stormwater discharge is exempt from stormwater permitting requirements of the Department pursuant to Florida Administrative Code Rule 17-25.03(2)(c)." DER came to this conclusion in 1984 because the proposed project was "the modification of an existing County stormwater management system not serving a new development or increasing pollution loading." Although Lake Blake was utilized by Okaloosa County as part of the existing Okaloosa County stormwater drainage system, which in 1984 qualified for a DER stormwater permitting exemption, nothing pertaining to this stormwater permitting exemption supports a finding that Lake Blake was originally constructed, permitted or designed solely for the purpose of stormwater treatment so as to qualify for an exemption from DEP's dredge and fill jurisdiction under Rule 62-312.050(4), Florida Administrative Code. Dredge and Fill Permitting Jurisdiction Prior to the installation of Okaloosa County's stormwater discharge pipes on the property in the 1960's, there was no dredge and fill permitting jurisdiction which applied to the property and Lake Blake. Under current law, the Northwest District of Florida is governed by separate jurisdictional determination provisions. In order to initially establish DEP's dredge and fill permitting jurisdiction over wetlands and surface waters in the Northwest District, DEP must demonstrate that the wetlands and surface waters are connected to the surface waters of the State. Since 1995, isolated wetlands in all the rest of the State of Florida are regulated by DEP without regard to any connection to the surface waters of the State. In the Northwest District under Rule 62-312.030(2), Florida Administrative Code, "surface waters of the state are those waters listed below and excavated water bodies, except for those exempted by Section 62-312.050(4), F.A.C., which connect directly or via an excavated water body or series of excavated water bodies . . ." to waters of the State. Under Rule 62- 312.045, Florida Administrative Code, however, "[i]solated wetlands that infrequently flow or otherwise exchange water with a described water body are not intended to be included within the dredge and fill jurisdiction of the Department." By letter dated April 24, 2001, DEP advised Santa Rosa II, Inc., that the Lake Blake property was not subject to DEP's dredge and fill jurisdiction. The letter was sent in response to an application seeking to fill 2.5 acres of the southeastern portion of the lake for the construction of an apartment complex. The letter was issued by DEP's Northwest District, and signed by Martin Gawronski on behalf of Larry O'Donnell, the Environmental Manager for Permitting Section of the Northwest District. The letter was issued after a visit to the property by one or more DEP employees, and based on an informal determination that Lake Blake was not connected to the waters of the State. In May of 2001, the United States Army Corps of Engineers determined that the Lake Blake property was not within its jurisdiction. Subsequent to the issuance of the April 24, 2001, non- jurisdictional letter, certain employees of Okaloosa County (not specifically named in these proceedings) contacted DEP seeking reconsideration of DEP's decision. These Okaloosa County employees thereafter met with DEP employees at the property and communicated by telephone with DEP employees while DEP considered a re-determination of its non-jurisdictional decision. The property owners were then notified that DEP was in the process of re-evaluating its non-jurisdictional decision. By letter dated October 24, 2001, DEP advised Santa Rosa II, Inc., that DEP had made a "correction" to the letter of April 24, 2001, and had determined that the property was in fact subject to DEP's dredge and fill permitting jurisdiction, because the "pond" was "connected to jurisdictional waters" of the State. The October 24, 2001 letter, like the previous letter, was issued from DEP's Northwest District signed by Martin Gawronski on behalf of Larry O'Donnell. Between April 24, 2001, and October 24, 2001, there were no man-made alterations made to the Lake Blake property. Between March and April 2002, Maddan filled in a portion of the lake and lacustrine wetlands. Maddan also built two pedestrian footbridges over the lake to the small island in the middle of the lake. DEP asserted its dredge and fill permitting jurisdiction based upon the existence of a series of underground pipes installed by Okaloosa County as part of its stormwater drainage system that conveys excess stormwater from Lake Blake to Cinco Bayou. Installation of the underground pipes required excavation. Neither the April 24, 2001 letter, nor the subsequent October 24, 2001, letter issued by the Northwest District, is binding determination of DEP's dredge and fill permitting jurisdiction over the wetlands and surface waters of Lake Blake. The authority to make a binding DEP dredge and fill permitting jurisdictional determination is vested in Dr. John Tobe, Environmental Administrator of the Wetland Evaluation and Delineation Section and his staff. DEP's Site Inspections/Jurisdictional Determination In April of 2002, Stacy Owens, DEP Environmental Specialist, received a telephone call from Chuck Bonta with the Okaloosa County Code Enforcement Department, and an unnamed homeowner, complaining that Lee Maddan had built two unpermitted pedestrian footbridges at Lake Blake and was also filling in part of Lake Blake. Ms. Owens initially investigated whether DEP had issued any permits for the placement of fill in Lake Blake or the surrounding wetlands, and determined that no permits had been issued. Ms. Owens further discovered that a prior Notice of Violation and Orders for Corrective Action had been issued by DER in 1980 against the Okaloosa County Board of Commissioners and Lloyd D. Junger (a lessor conducting mining operations). The 1980 case pertained to the discharge of turbidities from the Lewis Street Pond into Cinco Bayou. A final order in that case was entered on January 5, 1981, requiring Okaloosa County to make payment to DER and take corrective action. On April 23, 2002, Ms. Owens followed up on these complaints by performing a site visit to Lake Blake. At this time Ms. Owens observed two unpermitted pedestrian footbridges, unpermitted fill in a finger of Lake Blake, and unpermitted fill within a 20-foot by 25-foot lacustrine wetland area. On April 25, 2002, Maddan came to Ms. Owens' office to discuss whether permits were necessary for the placement of fill at Lake Blake. At that time Maddan showed Ms. Owens the previous letters of April 24, 2001, and October 24, 2001, which had been sent from the Northwest District of DEP. Maddan stated that in his opinion no dredge and fill permit was needed because Lake Blake was not within the jurisdiction of DEP. Ms. Owens was then informed by employees of Okaloosa County that there were underground pipes connecting Lake Blake to Cinco Bayou. She obtained from Gary Bogan of Okaloosa County an aerial map of the drainage area for Lake Blake which identified the location of the culvert on Lewis Street which conveys excess flow from Lake Blake to Cinco Bayou. On April 30, 2002, Ms. Owens performed another site inspection at Lake Blake. During this site inspection, she tracked the connection from Lake Blake to Cinco Bayou by personal observation. After her second site inspection, Ms. Owens e-mailed her findings to Dr. Tobe, and inquired whether the underground pipes satisfied the DEP requirements for connection to a water body of the State for the purpose of establishing DEP's dredge and fill permitting jurisdiction. Dr. Tobe replied to Ms. Owens that an underground pipe connection would satisfy DEP's jurisdictional requirements. On June 25, 2002, Dr. Tobe, Ms. Owens, and a DEP wetland delineation team visited the Lake Blake property for the purpose of making a jurisdictional determination. Maddan also accompanied Dr. Tobe and his team on the day of the site inspection. As a result of this inspection, Dr. Tobe completed and filed a Field Report for Lake Blake, Okaloosa County, dated June 25, 2002. As indicated in his Field Report, Dr. Tobe and his wetland delineation team determined that for jurisdictional purposes, Lake Blake was connected to the waters of the State by reason of the culvert on Lewis Street that ultimately discharges into Cinco Bayou. At the time of his inspection on June 22, 2002, Dr. Tobe did not observe water flowing from Lake Blake into the Lewis Street culvert. Dr. Tobe attributed this to abnormal drought conditions the area was then experiencing. Maddan, who has observed this area for many years, testified that the lake was near or slightly less than its normal water level on that date. Dr. Tobe conducted a further examination of the area to determine the ordinary high water line, and concluded that Lake Blake would at ordinary high water level flow into the Lewis Street culvert on a sufficiently regular frequency into Cinco Bayou, a water body of the State, in order to establish DEP's dredge and fill jurisdiction. In determining whether water exchange frequency is sufficient to establish jurisdiction, there is a DEP Interoffice Memorandum of October 31, 1988, setting out 25-year, 24-hour criteria which is used as guidance, but the criteria stated in this Memorandum have not been adopted as a rule, and are not singularly determinative of DEP's jurisdiction. At this time, Dr. Tobe and his team also performed a wetland boundary delineation. Dr. Tobe found hydric soils and wetland plants dominating the area. The wetland delineation boundary was determined by the continual interpretation of vegetation, soils, and hydrologic indicators. As a result of his inspection and wetland boundary delineation, Dr. Tobe concluded that unpermitted fill had been placed within the surface waters of the State, and in lacustrine wetlands.. Thereafter on July 18, 2002, DEP sent Maddan a Warning Letter (DF-SO-46-022) requesting that Maddan cease dredging, filling or construction activities at Lake Blake without obtaining a permit. Subsequent to DEP's sending Maddan the Warning Letter of July 18, 2002, Stacy Owens visited the Lake Blake site on numerous occasions beginning in October of 2002, and continuing through July of 2003. On most of these site visits Ms. Owens observed water flowing from Lake Blake through the Lewis Street culvert. Ms. Owens documented water flowing from Lake Blake through the Lewis Street culvert on October 29, 2002, November 5, 2002, May 20, 2003, June 20, 2003, June 23, 2003, June 27, 2003, and July 8, 2003. The area was not experiencing abnormally excessive rainfall events at the times that Ms. Owens documented water flowing from Lake Blake into the Lewis Street culvert. Maddan testified that in his personal observation over many years, Lake Blake generally discharges excess stormwater into the Lewis Street culvert only as a result from a significant rainfall event. Lake Blake discharges water into the Lewis Street culvert at regular intervals. The water discharged from Lake Blake ultimately is released through the Okaloosa County stormwater drainage system into the surface waters of Cinco Bayou, a water body of the State of Florida. The Okaloosa County stormwater drainage system connecting Lake Blake to Cinco Bayou is a series of excavated water bodies. Lake Blake is connected to the surface waters of Cinco Bayou, and regularly exchanges water with Cinco Bayou. Exemptions from DEP's Jurisdiction To assert dredge and fill permitting jurisdiction over this property, not only must Lake Blake be connected to the waters of the State, but the property must not be otherwise exempt from dredge and fill permitting jurisdiction under either statute or rule. On August 29, 2002, under the authority of the Corporation, Maddan filed a "Joint Application for Works in the Waters of Florida" with DEP requesting an exemption from DEP's dredge and fill permitting jurisdiction under Rule Chapter 17- 312, re-codified as Rule Chapter 62-312. Rule 62-312.050, Florida Administrative Code, sets out the recognized exemptions to DEP's dredge and fill permitting jurisdiction. Maddan primarily relies on Rule 62-312.050(4) which provides that "[n]o permit under this chapter shall be required for dredging or filling in waters which are contained in those artificially constructed stormwater treatment and conveyance systems designed solely for the purpose of stormwater treatment and that are regulated by the Department or the water management district." Lake Blake, however, is the result of excavations in a borrow pit. Because of surrounding development, Lake Blake receives stormwater runoff; however, the lake was not "designed solely for the purpose of stormwater treatment," and cannot therefore qualify for this exemption. Maddan also cites Rule 62-312.050(1)(g), Florida Administrative Code, which provides an exemption for the "construction of seawalls or riprap, including only that backfilling needed to level land behind the seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control." Even assuming that the filling of the finger of Lake Blake meets the test of construction of a seawall, there is no evidence that such filling of Lake Blake was ever subjected to appropriate water quality tests, much less meeting such water quality tests as well as the other requirements of this exemption. In addition to the exemptions established by Rule 62- 312.050, Maddan cites statutory exemptions. The definition of "waters" which are regulated under Chapter 403 as set forth in Section 403.031(13), provides in pertinent part that "[w]aters owned entirely by one person other than the state are included only in regard to possible discharge on other property or water." Although Lake Blake is owned entirely by one person, this provision does not exempt Lake Blake because the lake actually discharges on the surface waters of Cinco Bayou. Maddan also cites Section 403.812, which provides that "[t]he department shall not require dredge and fill permits for stormwater management systems where such systems are located landward of the point of connection to waters of the state and are designed, constructed operated and maintained for stormwater treatment, flood attenuation, or irrigation." Although Lake Blake has been utilized by Okaloosa County's stormwater drainage system which is located landward of Cinco Bayou, the lake was not designed nor constructed for stormwater treatment, flood attenuation or irrigation, and it is not being operated nor maintained for stormwater treatment, flood attenuation or irrigation. Lake Blake does not qualify for an exemption from DEP's dredge and fill permitting jurisdiction. Dredge and Fill Permit Denial On September 30, 2002, Maddan was notified of DEP's denial of his application to place a modular home on a fill pad in Lake Blake. Because Maddan took the position that DEP did not have dredge and fill jurisdiction over Lake Blake, or alternatively that Lake was exempt from DEP's jurisdiction, an analysis of whether Maddan's application might be approved under Rule 62- 312.060(5), Florida Administrative Code, has not been done. DEP has not performed any analysis of water quality standards nor public interest assessment required by the rule, and Maddan offered no evidence which would be necessary to make such determinations.
Recommendation Based upon the foregoing findings of fact and conclusions of law, it is recommended that a final order be entered upholding denial of Maddan's Permit Application No. 46-0199306- 001-EE. DONE AND ENTERED this 10th day of October, 2003, in Tallahassee, Leon County, Florida. S RICHARD A. HIXSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of October, 2003. COPIES FURNISHED: Charles T. Collette, Esquire Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 James E. Moore, Esquire Post Office Box 746 Niceville, Florida 32588 Robert W. Stills, Jr., Esquire Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Teri L. Donaldson, General Counsel Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kathy C. Carter, Agency Clerk Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
Findings Of Fact The Parties and the Property. The Respondent, HORNE, owns or has options to purchase approximately 24.35 acres of real property at the southwest corner of U.S. Highway 41 and State Road 50 Bypass in Brooksville, Florida. The Petitioner, the ASSOCIATES, owns approximately 67.5 acres of real property to the south and downstream from the HORNE property. The ASSOCIATES' property is presently undeveloped. The HORNE property contains an existing Publix shopping plaza, a mobile home sales office and vacant lands. The Publix plaza was previously permitted by the DISTRICT before it was constructed. The Surface Water Permit Application On August 7, 1992, HORNE submitted its application for surface water permit No. 400317.02. The application sought approval to construct a surface water management system for a proposed new K-Mart store on HORNE's property. On November 3, 1992, the DISTRICT issued notice of final agency action approving issuance of permit No. 400317.02 to HORNE. The day before the original final hearing in this matter scheduled for March 1993, new information from a study called the Peck Sink Watershed Study came to light which rendered the project as then designed unpermittable. This information resulted in the surface water management system being redesigned. On April 1, 1993, the DISTRICT notified all of the parties that the redesigned surface water management met District rule criteria. This resulted in issuance of what became known as the April 1 submittal. On May 12, 1993, in response to concerns raised by the ASSOCIATES at depositions on May 10, 1993, HORNE produced the May 12 submittal and provided it to all parties on that same date. The changes in design reflected on the May 12 submittal related to lowering the pond bottoms one foot below the orifices and changing the contour lines on the outside of Pond 5A. On May 13, 1993, further minor changes were made to the permit materials. Specifically, the changes were: reflecting on the engineering worksheets the lowering of the pond bottoms accomplished on the May 12 submittal, correction of the contour line on the outside of Pond 5A and showing the amount of additional fill into the 100-year floodplain caused by the addition of the contour line to the outside of Pond 5A. In reviewing HORNE's application, the District applied the standards and criteria set forth in Chapter 40D-4, Florida Administrative Code, and the Basis of Review for Surface Water Management Permit Applications. Compliance with DISTRICT Permitting Criteria Water Quantity The main two areas considered by the DISTRICT in assessing water quantity in a closed basin are: attenuating the peak rate of discharge for the 25 runoff for the 100 The peak rate of runoff for this project for the 25 (2) cubic feet per second (cfs) less in the post-developed condition than in the pre-developed condition, as shown on the April 1 submittal. No changes were made between the April 1 and May 12 or 13 submittals relating to the peak rate of discharge. The difference in the volume of runoff between the pre-developed and post-developed condition during the 100-year storm is being retained on site, as shown on the April 1 submittal. Therefore, DISTRICT rule criteria for the peak rate and volume of runoff were met on the April 1 submittal. Lowering the bottoms of the detention ponds on the May 12 and 13 submittals resulted in additional post 100 system, as redesigned to retain this additional 100-year volume, exceeds the DISTRICT's 100 Floodplain Encroachment Under the DISTRICT's floodplain encroachment standards, any fill within the 100 out an equivalent volume of fill elsewhere on the property. HORNE's application satisfies the DISTRICT's floodplain standards. HORNE is filling 1.59 acre feet of the floodplain and creating 1.75 acre feet of compensation. The floodplain compensation will be above the seasonal high water table, as required by Section 3.2.1.4 of the DISTRICT's Basis of Review. The original, existing seasonal high water table will be lowered as a result of the excavation so that the entire floodplain compensation area will be above the seasonal high water table. Water Quality A wet detention system as proposed by HORNE is an acceptable means under the DISTRICT's rules of treating runoff for water quality purposes. The bottoms of the ponds, as shown on the May 12 submittal, are all at least one foot below the orifice elevations, as required by the Basis of Review. Thus, the project met all relevant DISTRICT water quality requirements as of the May 12 submittal. Operation and Maintenance DISTRICT rules require that reasonable assurances be provided that the surface water management system can be effectively operated and maintained. HORNE will be the operation and maintenance entity for this surface water management system. The DISTRICT's main concerns at the time of permit review are that the design of the surface water management system not be an exotic design, that the design insure that littoral zones can be established, that the system orifice can be cleaned, that the overall system will be stable and that there is a viable operation and maintenance entity. HORNE's project can be effectively operated and maintained. Remaining District Rule Criteria As stipulated to by the parties that the project will not cause adverse impacts to wetlands and will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it in Chapter 40D Additionally, the proof establishes that the project will not cause adverse impacts on surface and groundwater levels and flows will not adversely affect the public health and safety; is consistent with the requirements of other public agencies; will not otherwise be harmful to the water resources within the District; will not interfere with the legal rights of others as defined in Rule 17 Objections Raised by the ASSOCIATES at the Hearing Pond Slopes and Operation and Maintenance Contrary to the assertion that the pond slopes will not be stable and cannot be effectively operated and maintained, the pond side slopes at this project are going to be constructed out of a heavy clay type of soil. Sodded side slopes of 1:1, as proposed for three of the ponds, can be stabilized and effectively operated and maintained. Although there is no DISTRICT requirement that sodded side slopes be mowed, so on these slopes could, if necessary, be cut. In the event the side slopes were to erode, easy repair is possible. All of the ponds except one side of one pond have areas at least 20 feet wide and slopes no steeper than 4:1 where maintenance can be performed. With regard to the pond that does not have this characteristic, equipment can enter and perform necessary maintenance. Water Quality Treatment Concerns that at least a portion of the bottoms of the ponds need to be below the seasonal high water table and that circulation of the ponds needs to be maximized in order to meet water quality treatment criteria are misplaced since there is no requirement that the pond bottoms be below the seasonal high water table in wet detention systems such as the one at issue in this case. Further, the entire bottoms of the ponds are littoral zone and meet DISTRICT rule requirements that 35 per cent of the pond be littoral zone, concentrated at the outfall. Additionally, the ponds at issue maximize circulation through the location of points of inflow and outflow. Floodplain Mitigation Concerns that volume in the floodplain mitigation area is not available because of problems with the seasonal high water table are also misplaced. Specifically, the floodplain area encroachment requiring mitigation relates to Pond 5A. There is more than enough volume within the area which will be excavated to compensate for the area where the fill will be deposited. The seasonal high water table will be at or below the floodplain mitigation area after the required excavation takes place. Although the seasonal high water table will be lowered where the excavation or cut is made and later raised where the fill is placed, no adverse effects on the water table will result from such lowering and raising of the water table. Volume In Pond 5A Allegations that the May 12 and 13 submittals reflect that Pond 5A has less volume available than the modeling calculations contemplate are incorrect. The changes in the contour lines of Pond 5A on the May 12 and 13 submittals from what was shown on the April 1 submittal occurred on the outside of the pond. The volume on the inside of the pond was not reduced actually increased when the pond bottom was lowered for water quality purposes. In determining how much volume a pond is to have when it is constructed, the computer modeling figures take precedence over the scaled plan drawings. In this case, the computer modeling figures never changed after the April 1 submittal. HORNE submitted a computer model that calculated the volume of Pond 5A. The output data clearly reflects that the top of the bank was 82 feet. Publix's Status as an Existing Site Assertions that the Publix site should have been considered in its pre-developed state since there will be approximately one acre foot of volume of runoff, or possibly less, leaving the site without retention are without validity. The Publix plaza was permitted by the DISTRICT in 1985 and constructed in 1986. The amount of peak flow discharge and overall discharge is currently authorized by a valid MSSW permit. When the DISTRICT reviews a permit application, all existing permitted surface water management systems must be accepted in their present state. There is no authority in the DISTRICT's rules to consider an existing permitted site in its pre Even if the Publix site is considered in its pre project has only .02 of an acre foot more volume of runoff in its post-developed condition than in the pre Storage of 100-Year Volume Allegations that the amount of 100-year volume being retained on site in the ponds has been incorrectly calculated by the DISTRICT and HORNE are also invalid. The DISTRICT's rules require that the difference between the pre- and post-development volume for the 100-year storm be retained on site. In the ponds which are the subject of this proceeding, the 100-year volume is retained in the ponds below the orifice. This volume cannot leave the site through the orifice; it can only leave the site by percolation into the ground or evaporation into the air.
Recommendation Based on the foregoing, it is recommended that the Southwest Florida Water Management District enter a final order granting HORNE's Application for Surface Water Management Permit No. 400317.02. RECOMMENDED this 25th day of June, 1993, in Tallahassee, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of June, 1993. APPENDIX The following constitutes my rulings, in accordance with Section 120.59, Florida Statutes, on proposed findings of fact submitted by the parties Proposed findings submitted by Petitioners (Petitioner's proposed findings begin at paragraph number 13.) 13.-19. Accepted. 20.-30. Rejected, unnecessary. 31.-44. Rejected, subordinate to hearing officer findings. 45.-47. Accepted. 48.-77. Rejected, subordinate to hearing officer findings. 78.-79. Rejected, recitation of documents. 80.-84. Rejected, weight of the evidence. 85.-88. Rejected, unnecessary. 89.-93. Rejected, weight of the evidence. 94.-95. Rejected, unnecessary. 96. Accepted. 97.-98. Rejected, subordinate, weight of the evidence. 99.-100. Rejected, unnecessary. 101.-126. Rejected, subordinate. 127. Accepted. 128.-129. Rejected, unnecessary. 130.-135. Rejected, argument. 136.-144. Rejected, weight of the evidence. Respondents Joint Proposed Findings. 1.-56. Accepted, though not verbatim. 58.-59. Rejected, unnecessary. COPIES FURNISHED: David Smolker, Esquire Honigman, Miller, Schwartz & Cohn 2700 Landmark Centre 401 East Jackson Street Tampa, Florida 33602 Rodney S. Fields, Jr., Esquire Blain & Cone, P.A. 202 Madison Street Tampa, Florida 33602 Richard Tschantz, Esquire Mark F. Lapp, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899
Findings Of Fact Respondent, South Florida Water Management District (District) is a multipurpose water management agency of the State of Florida. Its duties include the operation and maintenance of a vast network of canals which provide flood control and other benefits to Palm Beach County. Pertinent to this proceeding, the District is the owner in fee of a 600' right of way which contains a canal known as C- The tidewater reach of C-18 extends east from a control structure (S-46) near State Road 706 downstream for a distance of 8,375' (1.6 miles) to the southwest fork of the Loxahatchee River. Of this distance, 7,322' lie upstream from a small bridge, which crosses the C-18 at Loxahatchee River Drive (the bridge) and 1,053' downstream. The canal is approximately 200' wide, with 200' of overbank right of way on its north and south sides. The River Trails Development Petitioner, River Trails, Ltd (River Trails) is the developer of a 28 acre condominium community in Palm Beach County known as River Walk. The River Walk development, comprised of 347 townhouse units, is contiguous to 2,500' of the south overbank right of way of the C-18, approximately midway between S-46 and the southwest fork of the Loxahatchee River. On December 9, 1983, River Trails filed an application with the District for a right of way occupancy permit to selectively clear and regrade the C-18 right of way and to construct a marina facility within the right of way consisting of a temporary parking area, boat ramp and 3 docking facilities with a combined capacity of 97 boats. The District approved River Trails' application and issued it a permit on January 12, 1984. That permit provided: WORK PROPOSED WILL BE COMPLETED ON OR BEFORE 1-31, 1985, otherwise, this permit is voided and all rights thereunder are automatically cancelled unless an extension to the construction period is applied for and granted. Upon receipt of the District's permit, River Trails began to selectively clear the bank of the canal of exotic vegetation, primarily Brazilian pepper, and to regrade the bank to a more gentle slope than its existing 12'-14' vertical drop on the west and 2'-3' vertical drop on the east. In the process, 28 mangrove trees were damaged or destroyed.1 To settle a dispute which arose between Palm Beach County and River Trails over the destruction of the mangroves, River Trails agreed to plant additional mangroves and spartina grass along the southeasterly shoreline of the C-18. To consummate that agreement, River Trails requested that the District modify its permit to allow the selective planting of mangroves and spartina grass along the shoreline and in a tidal slough, to alter the bank slope to provide a wider intertidal zone to accommodate the plantings, and to move the proposed docks further out from the bank of the canal. The District granted River Trails' requested modification on June 25, 1984 subject to the following special conditions: Construction of the boat dock facilities as originally permitted and modified hereunder is subject to the issuance of a permit from the DER. Prior to commencement of construction, the applicant shall submit a DER permit for the boat docking facilities. Any future modification of the boat docking facilities by the applicant must have the approval of the governing board prior to construction. Rule 40E 6.301(c), Florida Administrative Code, requires an applicant to give reasonable assurances that the proposed use of the works of the district "does not degrade the quality of the receiving body and meets the standards of the Florida Department of Environmental Regulation for the receiving body. The board may waive the strict enforcement of this provision." Neither issuance of the original permit nor this modification shall be construed as a waiver of this provision as it applies to the per- mitting activity of the DER relative to this project. Department of Environmental Regulation Permitting On December 22, 1983, River Trails applied with the Department of Environmental Regulation (DER) for a permit and water quality certification to construct its boat ramp and 97 slip marina. During the processing of that application, River Trails requested two waivers of the 90 day time period prescribed by Sections 120.60(2) and 403.0876, Florida Statutes, (180 days total) in order to conduct a hydrographic survey of the area in order to respond to water quality concerns raised by DER. River Trails did not submit a hydrographic survey to DER, nor did it offer such a survey in this proceeding. On December 20, 1984, DER advised River Trails that its proposed boat ramp was exempt from permitting requirements. Thereafter, on December 21, 1984, DER issued its "intent to deny" the balance of River Trail's application predicated on its conclusion that the project was expected to have a long and short term adverse impact on the water quality and biological resources of the C-18 canal and the adjacent Outstanding Florida Waters of the Loxahatchee River. Specifically, DER found that degradation of water quality in the project's Class II waters and the adjacent Outstanding Florida Waters would likely occur due to: Shading from docks and walkways that would likely prohibit recolonization of shoreline vegetation. Marinas can be expected to lower water quality by the accumulation of marina source contaminants, including heavy metals, greases, oils, detergent ,and litter. Increased boat traffic (97+ boats), and their associated wakes will result in increased shoreline erosion. This additional erosion can prohibit the recolonization of shoreline vegetation beneficial to water quality. The cumulative impact of this project and other similar projects within the C-18 canal would be expected to degrade water quality. Prop wash from outboard motor boats in shallow littoral shelf areas will cause turbidity problems and adversely impact existing benthic communities. DER further found the proposed activity contrary to the public interest provisions of Chapter 253, Florida Statutes, since the proposed marina would substantially interfere with the conservation of the Florida Manatee and the destruction of natural marine habitat. River Trails declined to pursue its DER application for the 97 slip facility any further. Instead, it filed an application with DER for a docking facility of less than 1,000 square feet, accommodating 37 boats, to qualify for the exemption provided by Section 403.812(2)(b), Florida Statutes. Following a successful rule challenge in April 1985, River Trails received its statutory exemption. The District's emerging management policy. Shortly after the District approved River Trail's modification on June 25, 1984, it began to receive a great deal of negative comment from the public, DNR, DER, and the United States Fish and Wildlife Service. These comments, of which the District was not previously aware, included concerns for the Loxahatchee River, the Florida manatee, and negative biological and water quality assessments. Accordingly, the District's Governing Board requested that its staff investigate and evaluate various management options for the overall development of the 18 right of way. During the ensuing months the District's staff solicited input from DER, DNR, the Florida Game and Fresh Water Fish Commission and the United States Fish and Wildlife Service; investigated the C-18; and formulated its recommendations for the future management of the canal. On January 10, 1985, the District's staff submitted its management plan to the Governing Board. The plan recommended that the intertidal zone be widened a minimum of 10 and planted in mangrove and spartina to combat erosion of the canal banks by boat wakes; that the canal banks be regraded to a minimum of one vertical on four horizontal slope and stabilized with a combination of grasses, native trees and shrubs; and that the overbank right of way be cleared of exotic species and replanted with native trees and shrubs. In keeping with the main goal of habitat improvement, staff recommended that the cumulative linear extent of areas provided for bankfishing and viewing be limited to 10 percent of the shoreline and that no structure be located waterward of the mean high water line. Subsequent to its January 10, 1985, meeting the District has pursued its management plan for the alteration of the shoreline and berms of C-18. Since that time two permits have been issued to large developers who agreed to reslope and revegetate, at their expense, the banks of the C-18 in accordance with the District's plan, and in exchange for the esthetic view accorded by C-18. No dockage, boat ramps, or other structures have been permitted. River Trails' permit expires Following DER's denial of its application for a permit to construct the 97 slip marina, River Trails requested that the District modify its permit to reflect a 37 slip facility and extend the permit for one year. River Trails subsequently withdrew its request to modify the permit. On January 10, 1985, the District entered an order denying River Trails' request for a one year extension of its permit. The District's denial was predicated on its perceived environmental sensitivity of the C-18 canal and the Loxahatchee River system, and its conclusion that the project was contrary to the restoration concept of the District's developing management plan for the C-18. River Trails filed a timely request for hearing, and the matter was referred to the Division of Administrative Hearings and assigned Case No. 85-2272. On July 16, 1985 River Trails reapplied to the District for approval of its modified proposal for a boat ramp and 37 slip marina. The District denied River Trail's request on September 12, 1985. Reasons for denial included adverse water quality impacts, endangerment of the manatee population, increased bank erosion and increased liability risks to the District associated with increased boat usage of the C-18. River Trails filed a timely request for hearing, and the matter was referred to the Division of Administrative Hearings and assigned Case No. 85- 3678. Impacts of the River Trails Development Because of its location and physical characteristics, boating activity in the C-18 has not been extensive. The canal joins the Loxahatchee River on its western shore, opposite the popular boating areas in the intercoastal waterway and Atlantic Ocean adjacent to the River's eastern shore. Access to the canal is restricted by a bridge with a 6' clearance, and its western expanse is blocked by S-46. Accordingly, boating activity within this 1.6 mile stretch of 18 has been generally limited to fishing trips to S-46, sightseeing, and occasional water skiing. River Trails' facility will increase boating within the C-18 well beyond the 37 slip capacity of its dock facility. River Trails proposes to provide upland storage for the boats of a all condominium unit owners, and expects a majority of owners to utilize the slips or boat ramp. Accordingly, use of the facility will not be limited to 37 boats but, rather, will reach into the hundreds. The District's management plan for the C-18 is designed to restructure the canal's present configuration to provide natural habitat, reduced erosion and scenic beauty. As originally designed, the C-18 had 1 on 2 side slopes throughout its reach, however, erosion of the bank downstream from S-46 has resulted in nearly vertical, unstable side slopes above mean high water along 40 percent of its length. The overbank right of way is heavily vegetated with exotic species. With the exception of several areas near the downstream end of the canal, mangroves are not well established along the existing shoreline due to the shading effect of overhanging Brazilian pepper and a rather narrow unstable intertidal zone. Currently, little use of the overbank right of way is made by the public due to its dense vegetation, and any view of the canal is severely impeded. Under the District's management plan the intertidal zone would be expanded and planted in mangroves and spartina to combat erosion from boat wakes and to provide natural habitat; existing vertical banks would be recontoured to a more gentle slope and stabilized with grasses and native trees; and the overbanks would be cleared of exotics so that native trees could prosper. To date the District has been successful in carrying out its plan; however, the survival of the mangrove seedlings and spartina is dependent on minimal disturbance. The introduction of the boats from River Trails would increase erosion and prevent the recolonization of shoreline vegetation beneficial to water quality, marine habitat, and canal bank stabilization. Furthermore, existing and proposed development along the C-18 right of way can be reasonably expected to exacerbate the erosion problem if River Trails' permit is granted. River Trails' proposed marina also raises the specter of adverse impacts to water quality, wildlife and habitat. The C-18 is classified as a Class II surface water body, and supports a diversity of aquatic life. Commonly observed species include snook, mullet, mangrove snapper, pinfish, needlefish and filter feeding organisms such as oysters. The endangered Florida Manatee, Trichechus manatus, is also observed in the C-18 and downstream in the Loxahatchee River. The Loxahatchee River is classified as outstanding Florida waters (OFW) and critical habitat for the Florida manatee. The river, as well as C-18 up to the S-46 control structure, has also been included by the Department of Natural Resources (DNR) within the Loxahatchee River Zone of the Florida Manatee Sanctuary Act.3 Due to the restricted access from C-18 into the Loxahatchee River, boats located at River Trails' development will likely be approximately 23' in length and powered by outboard motors. Such watercraft, through their introduction of oils and greases, contribute to a degradation of water quality however, neither party addressed the potential impacts to water quality which would be occasioned by the total number of boats that would utilize the boat ramp and boat slips at the proposed facility. By failing to address this issue, and limiting its proof to the impacts from a maximum of 97 boats, River Trails has failed to give reasonable assurances that its proposed project will not cause or contribute to a violation of Class II water quality standards. The impact of River Trails' project upon the Florida manatee is less clear than its impact upon the C-18. Although designated part of the manatee sanctuary, C-18 presently offers little in the way of food source for the manatee with the exception of some plant materials near S-46. The grass Fla. within the Loxahatchee River and the intercoastal waterway are the manatee's primary food source and congregating areas; however, as the mangrove and spartina plantings along the intertidal zone of the canal mature, the manatee may more often. venture into the canal. Whatever their frequency within the narrow confines of the C-18, the numbers of boats that would be introduced by River Trails would drive the manatee from the area. These boats would not, however, pose a significant threat to the manatee or its habitat within the Loxahatchee River since its navigation channels are well marked to avoid grass flats. Indeed, there has been no boat related manatee mortality in the Loxahatchee River area since 1977. The District's concern regarding increased liability risk is unpersuasive. Pursuant to rule the District requires that an applicant for a permit to occupy right of way provide the District with insurance coverage satisfactory to the District, There is no suggestion that the insurance coverage tendered by River Trails, and accepted by the District, was inadequate or otherwise unsatisfactory. The District's decision to deny River Trail's application was not inconsistent with its existing practice. While the District has permitted docks and boat ramps in other canals, there was no showing that those canals abutted a sanctuary or were under redevelopment to improve the works of the District.
The Issue The issue to be determined is whether Respondent Land Trust #97-12 (“Land Trust”) is entitled to an Environmental Resource Permit (“ERP”) for its proposed project on Perico Island in Bradenton, Florida.
Findings Of Fact The Parties Petitioner Joseph McClash is a resident of Bradenton, Florida, who uses the waters in the vicinity of the project for fishing, crabbing, boating, and wildlife observation. Petitioner Manasota-88, Inc., is an active Florida nonprofit corporation for more than 20 years. Manasota-88 has approximately 530 members, most of whom (approximately 300) reside in Manatee County. The mission and goal of Manasota-88 includes the protection of the natural resources of Manatee County, including Anna Maria Sound and Perico Island. Petitioner FISH is an active Florida nonprofit corporation in existence since 1991. FISH owns real property in unincorporated Cortez in Manatee County and maintains a Manatee County mailing address. FISH has more than 190 members and more than 150 of them own property or reside in Manatee County. The mission and goal of FISH includes protection of the natural resources of Manatee County, including Anna Maria Sound and Perico Island. Intervenor Suncoast Waterkeeper, Inc., is an active Florida nonprofit corporation in existence since 2012. The mission of Suncoast Waterkeeper is “to protect and restore the Suncoast’s waterways through enforcement, fieldwork, advocacy, and environmental education for the benefit of the communities that rely upon coastal resources.” Suncoast Waterkeeper provided the names and addresses of 25 members residing in Manatee County. A substantial number of the members of Suncoast Waterkeeper use the area and waters near the proposed activity for nature-based activities, including nature observation, fishing, kayaking, wading, and boating along the natural shorelines of Anna Maria Sound and Perico Island. Intervenor Sierra Club, Inc., is a national organization that is a California corporation registered as a foreign nonprofit corporation in Florida. Sierra Club has been permitted to conduct business in Florida since 1982. The mission of Sierra Club includes protection of the natural resources of Manatee County, which include Anna Maria Sound and Perico Island. Sierra Club provided the names and addresses of 26 members who live in Manatee County. A substantial number of the members of Sierra Club use the area and waters near the proposed project for nature-based activities, including observing native flora and fauna, fishing, kayaking, wading, and boating along the natural shorelines of Anna Maria Sound and Perico Island. Respondent Land Trust is the applicant for the challenged ERP and owns the property on which the proposed project would be constructed. Respondent District is an independent special district of the State of Florida created, granted powers, and assigned duties under chapter 373, Florida Statutes, including the regulation of activities in surface waters. The proposed project is within the boundaries of the District. The Project Site The project site is 3.46 acres of a 40.36-acre parcel owned by Land Trust. The parcel includes uplands, wetlands, and submerged lands, on or seaward of Perico Island, next to Anna Maria Sound, which is part of Lower Tampa Bay. Anna Maria Sound is an Outstanding Florida Water. The project site is adjacent to a large multi-family residential development called Harbour Isles, which is currently under construction. Access to the Land Trust property is gained through this development. The Land Trust parcel contains approximately seven acres of high quality mangroves along the shoreline of Anna Maria Sound. They are mostly black and red mangroves, with some white mangroves. The mangroves on the project site amount to a total of 1.9 acres. Mangroves have high biological productivity and are important to estuarine food webs. Mangroves provide nesting, roosting, foraging, and nursery functions for many species of wildlife. Mangroves also provide a buffer from storm surge and help to stabilize shorelines. Wildlife species found on the project site include ibises, pelicans, egrets, spoonbills, mangrove cuckoos, bay scallops, fiddler crabs, mangrove tree crabs, horseshoe crabs, marsh rabbits, raccoons, mangrove bees, and a variety of fish. No endangered species have been observed on the project site, but mangroves are used by a number of listed species. The Proposed Project The proposed project is to construct a retaining wall, place fill behind the wall to create buildable lots for four single-family homes, construct an access driveway, and install a stormwater management facility. The stormwater management facility is a “Stormtech” system, which is an underground system usually used in situations where there is insufficient area to accommodate a stormwater pond. Riprap would be placed on the waterward side of the retaining wall. The retaining wall would be more than 35 feet landward of the mean high water line in most areas. Petitioners contend the proposed retaining wall is a vertical seawall, which is not allowed in an estuary pursuant to section 373.414(5). “Vertical seawall” is defined in section 2.0(a)(111), Volume I, of the Environmental Resource Permit Applicant’s Handbook (“Applicants Handbook”) as a seawall which is steeper than 75 degrees to the horizontal. It further states, “A seawall with sloping riprap covering the waterward face to the mean high water line shall not be considered a vertical seawall.” The retaining wall is vertical, but it would have riprap covering its waterward face and installed at a slope of 70 degrees. The retaining wall is not a vertical seawall under the District’s definition. Stormwater Management Stormwater in excess of the Stormtech system’s design capacity would discharge into Anna Maria Sound. Because Anna Maria Sound is an Outstanding Florida Water, District design criteria require that an additional 50 percent of treatment volume be provided. The Stormtech system meets the District’s design criteria for managing water quality and water quantity. Projects which meet the District’s design criteria are presumed to provide reasonable assurance of compliance with state water quality standards. Petitioners’ evidence was not sufficient to rebut this presumption. Petitioners contend the District waiver of water quality certification for the proposed project means that Land Trust was not required to meet water quality standards. However, that was a misunderstanding of the certification process. All state water quality criteria are applicable. Petitioners contend water quality monitoring should be imposed for this project. However, section 4.7 of the Applicant’s Handbook, Volume II, provides that if the applicant meets the District’s design criteria, water quality monitoring is not required. Petitioners failed to prove the proposed stormwater management system cannot be constructed, operated, or maintained in compliance with applicable criteria. Wetland Impacts In order to create buildable lots, 1.05 acres of the 1.9 acres of mangroves on the project site would be removed and replaced with fill. A swath of mangroves approximately 40 feet wide would remain waterward of the retaining wall. The proposed direct and secondary impacts to the functions provided by wetlands were evaluated using the Uniform Mitigation Assessment Method (“UMAM”) as required by Florida Administrative Code Chapter 62-345. UMAM is used to quantify the loss of functions performed by wetlands considering: current condition, hydrologic connection, uniqueness, location, fish and wildlife utilization, time lag, and mitigation risk. The District determined the filling of 1.05 acres of wetlands would result in a functional loss of 0.81 units and the secondary impacts resulting from installation of the retaining wall would result in a loss of 0.09 units for a total functional loss of 0.9 units. Petitioners contend the functional loss would be greater. Petitioners contend the wetland delineation performed by Land Trust and confirmed by the District did not extend as far landward as the hydric soils and, therefore, the total acreage of affected wetlands would be greater. However, Petitioners did not produce a wetland delineation for the project site, and their evidence was not sufficient to rebut Land Trust's prima facie evidence on this issue. Petitioners’ experts believe the secondary impacts caused by the proposed project would be greater than calculated, including fragmentation of the shoreline mangrove system, damage to the roots of mangroves near the retaining wall, and scouring effects caused by wave action associated with the retaining wall. Respondents assert that the analysis by Petitioners’ expert Jacqueline Cook relied on federal methodology and that “the science used in her analysis is not contained in the state or district rule criteria.” Reliance on science is always appropriate. However, Ms. Cook’s use of a federal impact assessment methodology creates doubt about whether her scoring is consistent with UMAM. Despite the unreliability of Ms. Cook’s UMAM score, it is found that Respondents’ UMAM score under-calculated secondary impacts due to scour and other effects of changed water movement that would be caused by the retaining wall. It was not explained how the loss of storm buffering and erosion prevention functions of wetlands are accounted for in the UMAM score. Elimination or Reduction of Impacts Section 10.2.1 of the Applicant’s Handbook, Volume I, states that in reviewing a project the District is to consider practicable design modifications to eliminate or reduce impacts to wetland functions. Section 10.2.1.1 explains: The term “modification” shall not be construed as including the alternative of not implementing the activity in some form, nor shall it be construed as requiring a project that is significantly different in type or function. A proposed modification that is not technically capable of being completed, is not economically viable, or that adversely affects public safety through the endangerment of lives or property is not considered “practicable.” A proposed modification need not remove all economic value of the property in order to be considered not “practicable.” Conversely, a modification need not provide the highest and best use of the property to be “practicable.” In determining whether a proposed modification is practicable, consideration shall also be given to cost of the modification compared to the environmental benefit it achieves. Land Trust originally proposed constructing a surface water retention pond. The Stormtech stormwater management system would cause less wetland impact than a retention pond. Land Trust contends the use of a retaining wall reduces wetland impacts because, otherwise, more mangroves would have to be removed to account for the slope of the waterward side of the fill area. However, this proposition assumes the appropriateness of the size of the fill area. Land Trust also contends wetland impacts are reduced by using the adjacent development to access the proposed project site, rather than creating a new road. However, the evidence did not establish that Land Trust had a practicable and preferred alternative for access. Unlike the Stormtech system, the retaining wall and access driveway were not shown to be project modifications. The proposed project would cause fewer impacts to wetlands if the fill area was reduced in size, which was not shown to be impracticable. Reducing the size of the fill area would not cause the project to be significantly different in type or function. Land Trust did not demonstrate that it implemented reasonable design modifications to eliminate or reduce impacts to wetland functions. Mitigation Land Trust proposes to purchase credits from the Tampa Bay Mitigation Bank, which is 17 miles north of the proposed project site. The Tampa Bay Mitigation Bank is in the Tampa Bay Drainage Basin. The project site is in the South Coastal Drainage Basin. Pursuant to section 10.2.8 of the Applicant’s Handbook, Volume I, if an applicant mitigates adverse impacts within the same drainage basin, the agency will consider the regulated activity to have no unacceptable cumulative impacts upon wetlands and other surface waters. However, if the applicant proposes to mitigate impacts in another drainage basin, factors such as “connectivity of waters, hydrology, habitat range of affected species, and water quality” will be considered to determine whether the impacts are fully offset. The parties disputed whether there was connectivity between the waters near the project site and the waters at the Tampa Bay Mitigation Bank. The more persuasive evidence shows there is connectivity. There was also a dispute about the habitat range of affected species. The evidence establishes that the species found in the mangroves at the project site are also found at the mitigation bank. However, local fish and wildlife, and local biological productivity would be diminished by the proposed project. This diminution affects Petitioners’ substantial interests. The loss or reduction of storm buffering and erosion prevention functions performed by the mangroves at Perico Island cannot be mitigated for at the Tampa Bay Mitigation Bank. Cumulative impacts are unacceptable when the proposed activity, considered in conjunction with past, present, and future activities would result in a violation of state water quality standards, or significant adverse impacts to functions of wetlands or other surface waters. See § 10.2.8.1, Applicant’s Handbook, Vol. I. Section 10.2.8(b) provides that, in considering the cumulative impacts associated with a project, the District is to consider other activities which reasonably may be expected to be located within wetlands or other surface waters in the same drainage basin, based upon the local government’s comprehensive plan. Land Trust did not make a prima facie showing on this point. Land Trust could propose a similar project on another part of its property on Perico Island. Anyone owning property in the area which is designated for residential use under the City of Bradenton’s comprehensive plan and bounded by wetlands could apply to enlarge the buildable portion of the property by removing the wetlands and filling behind a retaining wall. When considering future wetland impacts in the basin which are likely to result from similar future activities, the cumulative impacts of the proposed project would result in significant adverse impacts to wetland functions in the area. Public Interest For projects located in, on, or over wetlands or other surface waters, an applicant must provide reasonable assurance that the project will not be contrary to the public interest, or if such activities significantly degrade or are within an Outstanding Florida Water, are clearly in the public interest, as determined by balancing the criteria set forth in rule 62- 330.302(1)(a), and as set forth in sections 10.2.3 through of the Applicant’s Handbook. Rule 62-330.302, which is identical to section 373.414, Florida Statutes, lists the following seven public interest balancing factors to be considered: Whether the activities will adversely affect the public health, safety, or welfare or the property of others; Whether the activities will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activities will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activities will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activities will be of a temporary or permanent nature; Whether the activities will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061, F.S.; and The current condition and relative value of functions being performed by areas affected by the proposed regulated activity. The Parties stipulated that the proposed project would not have an adverse impact on public health, navigation, historical resources, archeological resources, or social costs. Land Trust proposes to give $5,000 to the City of Palmetto for an informational kiosk at the City of Palmetto’s public boat ramp. A District employee testified that this contribution made the project clearly in the public interest. Reasonable assurances were not provided that the proposed project is clearly in the public interest because of the adverse cumulative effects on the conservation of fish and wildlife, fishing and recreational values, and marine productivity of Anna Maria Sound, an Outstanding Florida Water.
Recommendation Based on the Findings of Fact and Conclusions of Law set forth above, it is RECOMMENDED that the Southwest Florida Water Management District issue a final order that denies the Environmental Resource Permit. DONE AND ENTERED this 25th day of June, 2015, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of June, 2015. COPIES FURNISHED: Christian Thomas Van Hise, Esquire Abel Band, Chartered Post Office Box 49948 Sarasota, Florida 34230-6948 (eServed) Martha A. Moore, Esquire Southwest Florida Water Management District 7601 Highway 301 North Tampa, Florida 33637 (eServed) Douglas P. Manson, Esquire MansonBolves, P.A. 1101 West Swann Avenue Tampa, Florida 33606 (eServed) Joseph McClash 711 89th Street Northwest Bradenton, Florida 34209 (eServed) Ralf G. Brookes, Esquire Ralf Brookes Attorney 1217 East Cape Coral Parkway, Suite 107 Cape Coral, Florida 33904 (eServed) Justin Bloom, Esquire Post Office Box 1028 Sarasota, Florida 34230 (eServed) Robert Beltram, P.E., Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899
Findings Of Fact The following findings of fact are based on the evidence presented and relate both to Fairfield's MSSW and CUP applications: Fort George Island is an approximately 900 acre island located northeast of the City of Jacksonville in Duval County, Florida. It is bounded to the north and east by the Fort George River, to the west by an extensive salt marsh, and to the south by Batten Island and the St. Johns River. The island is separated from the Atlantic Ocean by Little Talbot Island. There are presently approximately 16 homes on Fort George Island, an existing 18-hole golf course with clubhouse, the Kingsley Plantation State Park in the north and the Rollins site surface waters on the northern two-thirds of the island are Class II waters, while the waters to the south are Class III. The following factors concerning Fort George Island are of ecological significance: Existence of a large area of coastal hammock; Value of the coastal hammock for scientific research and as a food source for migrating song birds; Fact that the Island is located in an aquatic preserve; Salt marshes on the western side of the Island which are a food source for wading birds; State lands on the Island which are utilized as wildlife and plant preserve, as well as for historical purposes; Estuaries on the western side of the Island which function as primary nursery areas for commercial and sport fishery species, as well as for shrimp, oysters and crabs; Existence of commercial oyster leases on the western side of the Island; and Public use of the Island's shoreline for oystering and clamming. Fairfield owns approximately 757.5 acres on Fort George Island which it proposes to develop into a "planned unit development" of 1,343 dwelling units, a 27 hole golf course, and approximately 80,000 square feet of commercial development. The approximate density of the development will be 1.8 units per acre. Approximately 80% of Fairfield's property is currently forested, and after development approximately 35% will remain undisturbed habitat. The City of Jacksonville approved the "planned unit development" on January 10, 1983. Because the Department of Community Affairs had determined on August 11, 1982, that this development was a "development of regional impact," Fairfield submitted an Application for Development Approval to the Department, the Northeast Florida Regional Planning Council, and the City of Jacksonville, which subsequently approved the proposed development in an Amended Development Order. On January 25, 1984, the Florida Land and Water Adjudicatory Commission approved the Amended Development Order (ADO). In addition to approving the development of maximum of 1,343 units, 80,000 square feet of commercial area, two 18 hole golf courses (one already in existence), and a marina with not more than 50 slips, the ADO required Fairfield to conduct a 12 month study and prepare a Master Resource Management Plan prior to development. Specifically, Fairfield was required to demonstrate that there is a sufficient supply of potable ground water to serve the entire development without adverse effects on the Floridan Aquifer and other existing legal users; establish the ambient conditions of the water surrounding Fort George Island and the ambient climatic conditions of the Island and Rollins Sanctuary through a 12 month monitoring program; identify all endangered, threatened, unique, rare, notable and "species of special concern" and determine their habitat requirements; address surface water quality and quantity, terrestrial and wetlands biology, and ground water quality and quantity for the entire project; and submit a revised Master Land Use Plan, consistent with the Master Resource Management Plan, to the City of Jacksonville's Planning Commission for its approval. Further, the ADO required Fairfield to demonstrate that it could retain the 100 year, 24-hour storm (calculated to be 11.04 inches of rain in 24 hours), and prevent degradation of the established ambient conditions of the waters surrounding Fort George. Finally, the ADO required Fairfield to submit its Master Resource Management Plan to the City, Regional Planning Council, Department of Community Affairs, Department of Environmental Regulation, Department of Natural Resources, Game and Fresh Water Fish Commission, and the District, for their, review, comment, and in some cases approval. After review and comment by these agencies, the City of Jacksonville Planning Commission approved the Master Resource Management Plan on January 29, 1986, from which no appeal was taken. Case Number 85-3537 (MSSW) The following findings of fact are based upon the stipulation of the parties and relate to Fairfield's MSSW application: The District, a special taxing district and agency, created by Chapter 373, is charged with the statutory responsibility of the administration and enforcement of permitting programs pursuant to Sections 373.413 and 373.416, Florida Statutes, and Chapter 40C-4, Florida Administrative Code. The District is the agency involved in this proceeding. The District has assigned Fairfield's conceptual MSSW permit application the permit number 4-031-002AC. Fairfield is a Delaware corporation authorized to do business in Florida. Its address is 3520 Piedmont Road, N.E., Atlanta, Georgia 30305. The proposed MSSW will serve Fairfield's development on Fort George Island, located in Duval County at Section 34, Township 15, Range 29 East. Petitioner Friends of Fort George, Inc., is a not-for- profit Florida Corporation, whose principal office for the transaction of business is located at 11251 Fort George Road, East, Jacksonville, Florida 32226. Petitioner in Intervention Southeastern Fisheries Association is a Florida not-for profit corporation whose address is 312 East Georgia Street, Tallahassee, Florida 32301. Petitioner in Intervention Logan Diving, Inc., is a Florida corporation whose address is 5731 St. Augustine Road, Jacksonville, Florida 32207. Petitioners in Intervention Florida Audubon Society and Duval Audubon Society are not-for-profit Florida corporations whose principal offices for the transaction of business are located at 1101 Audubon Way, Maitland, Florida 32751 and 2°65 Forest Circle, Jacksonville, Florida 32217. Individual Petitioners William E. Arnold, Jr., William M. Bliss, Doris B. Chappelle, Leo E. Chappelle, Mr. & Mrs. Rhodes Gay, Dr. & Mrs. William J. Knauer, Jr., Camillus S. Lengle, Jr., and Mr. & Mrs. J. W. Lucas are natural persons and citizens of the State of Florida who are owners of real property on Fort George Island. On August 27, 1985, the District gave Notice of its intent to deny MSSW application No. 4-031-002AC. On September 23, 1985, the District determined to recommend issuance of MSSW Application No. 4-031-002AC, as then modified, with conditions. Fairfield had originally contemplated in both its original Master Resource Management Plan (MRMP) and the referenced MSSW application that its proposed development for Fort George Island would have a 36-hole golf course facility. Fairfield subsequently reduced its proposed golf course facility from 36 holes to 27 holes. The City of Jacksonville's Planning Commission approved the MRMP with conditions, including the condition that the golf course be reduced, on January 29, 1986. Because of the reduction in size of Fairfield's proposed golf course facility from 36 to 27 holes Fairfield's total requirements for water for irrigation were reduced. By pleading dated April 7, 1986, Fairfield moved to amend its conceptual MSSW approval application. On April 10, 1986, the motion was granted pursuant to Stipulation of all the parties. The motion was granted by written Order of the Hearing Officer on April 17, 1986. The Petitioners' original Petition for Formal Administrative Proceedings was timely filed within fourteen (14) days of receipt of the District's proposed agency action of September 23, 1985. A number of the members of Friends of Fort George, Inc. own real property on Fort George Island, reside on the Island, and engage in recreational activities on the Island and its adjacent waters and environs. The subject matter of the proposed agency action challenged by Petitioners and Intervenors concerns the natural resources on Fort George Island. Protection of this resource falls within-the general purpose and objectives of Friends of Fort George, Inc., namely, the preservation, conservation, and restoration of Fort George Island and surrounding environs. The relief requested in this proceeding by Petitioners and Intervenors is denial of the conceptual management and storage of surface waters permit. The water storage ponds proposed in the project will intersect with the surficial aquifer on Fort George Island. Petitioners, Friends of Fort George, Inc. and Intervenors, Florida Audubon Society and Duval Audubon Society have standing pursuant to Section 403.412(5), Florida Statutes, to bring this action. During the hearing, the parties stipulated that Logan Diving, Inc., has standing in this proceeding since it is the holder of oyster and clam harvesting leases from the Department of Natural Resources for beds located in Class II waters adjacent to Fort George Island and it derives substantial income from harvesting of these beds. Closure or reclassification of these waters to limit or preclude shellfish harvesting would impair the value of Logan Diving's shellfish leases, or render them worthless. The following findings of fact relating to Fairfield's MSSW application are based upon the evidence presented, including the demeanor and credibility of witnesses who testified: Southeastern Fisheries Association, Inc., established at the hearing that it is a not-for-profit incorporated association of seafood producers, packers, canners, processors, wholesalers, retailers and others substantially involved in the seafood and fishing industries. Based upon the testimony of Robert P. Jones, 200 to 250 of the Association's 350 members shrimp in waters in the vicinity of Fort George Island, 26 of its members are residents of Duval or Massau Counties and 6 are residents of Fort George Island. Thus, a significant number of the Association's members harvest and transport seafood from the waters in the area of Fort George Island, and others also pack and process seafood from these waters. They would be substantially affected if the quality of these waters was degraded, or if the waters were closed to shellfish harvesting as a result of destruction to the nursery areas or reduction in quality or quantity of fish or shellfish which are harvested in these waters, or which utilize these waters as nursery areas. The objectives and purposes of the Association include promoting the general welfare of the fisheries industry and enhancing its economic progress. In contrast, the Florida Wildlife Federation was allowed to participate in this hearing but failed to offer any evidence in support of its verified Petition at the hearing. Fairfield's MSSW application is for conceptual approval, pursuant to District rule, and if conceptual approval is obtained Fairfield will then have to re-apply for construction, operation and maintenance MSSW permits. Although this is an application for conceptual approval, the documentation and information submitted by Fairfield to the District in support of its application is more thorough and complete than almost any other application for conceptual approval received by the District, and is actually superior to the documentation and information received from most applicants for construction permits. According to District staff, more sampling and testing results are presented in this conceptual application than they ever get. After initial review of its MSSW application by District staff following submission on January 5, 1984, Fairfield received a request for additional information. In responding to this request, Fairfield developed a plan of study which was approved by District staff and which focused on the water supply potential of the surficial aquifer, and the ability of a stormwater management and control system to retain stormwater on-site in compliance with the ADO and the District's permitting rules. Fairfield's study was comprehensive, and was completed in a very competent, professional manner. It included the collection of data through soil borings, installation of monitoring wells, conducting permeability and percolation tests, collecting rainfall data' and sampling of water quality. A water budget model was developed, and approved by the District, to compare existing conditions to proposed developed conditions and to specifically determine the water supply potential of the surficial aquifer, assess the availability of water for irrigation after development, assess changes in recharge to the surficial aquifer after development, and generally to determine how the development would impact the existing hyrologic cycle on the Island. Considering all of the evidence presented, it is specifically found that Fairfield utilized correct and appropriate input parameters in its water budget model to determine that currently 17.5 inches per year of freshwater is flowing from the Island to the surrounding estuary under average annual rainfall conditions, and after development approximately 16 inches per year of freshwater will flow from the Island to the estuary--less than a 10% change in ground- water flowing to the estuary. Therefore, the subject development will not adversely impact the overall water balance on Fort George Island. Utilizing the water budget model, under developed conditions it is shown that in a one-in-ten dry year there will be slightly more fresh water flow from the Island, and in a one-in-ten wet year there will be slightly less freshwater flow to the estuary than currently exists. This further demonstrates that overall water balance will be maintained. Total recharge will be greater post-development in average, wet and dry years. Fairfield's stormwater management system consists of a series of golf course fairway retention areas, and also includes four ponds in the north of the island which are interconnected, and one in the south, into which storm water will flow. The retention ponds comprise an area of approximately 32 acres. The fairway retention areas maximize percolation or infiltration, and water that remains to enter these ponds will be used for golf course irrigation through pumping. Generally, 95% of golf course need will be met by such pumping from the ponds, with the remaining need being met by withdrawals from the Floridan Aquifer. Under dry conditions, the need to withdraw from the Floridan Aquifer will be greater and could approach 49% of golf course irrigation requirements. The fairway retention areas and the five storage ponds comprise an on-line treatment system which will retain the first one-half inch of runoff, as well as additional runoff. Fairfield's on-line system is equivalent to an off-line system required by Rule Chapter 40C-42, Florida Administrative Code, for discharges to Outstanding Florida Waters (OFW) such as those that surround Fort George Island. Thus, the "first flush" containing a higher level of pollutants will be received by the retention areas and ponds in this on-line system and will primarily be removed through percolation in the retention areas. Pollutants should not be discharged into the estuaries, even in emergencies or when conditions exceed design capacity. Pond retention time will be approximately two months and surficial runoff will account for 5%-10% of the water in the ponds, with the rest coming from ground-water in-flow. Fairfield's storm water management system is operational and maintainable. It will be able to retain the 100 year, 24 hour storm event and otherwise meet the District's requirement that post-development discharge not exceed pre- development peak discharge. Surface discharges from the system will occur infrequently, perhaps every 80 years. Currently there is about one-half inch of direct surface runoff annually. Since surface runoff is a primary source of pollutant transport, the elimination of this runoff will have a beneficial effect on the estuary. The system will not degrade the quality of surrounding estuaries or the OFW since discharges to the estuaries will not occur from the ponds except under extreme conditions, and also because of the high level of treatment which will be provided by the ponds. Reasonable assurance has been given that water in the ponds will meet Class III standards, as well as the "free from" standards in Chapter 17-3, Florida Administrative Code, in the immediate future. The proposed ponds will be an improvement over existing borrow pits and bogs on the Island which have drastic side slopes and very long residence times, such as the Osmunda Bog, and will be a better habitat for fish and drinking water source for wildlife than the existing pits. It will also result in an improvement to Blue Pond, with better vegetation and habitat than currently exists, and with wildlife access being insured through preservation areas. A recognized and accepted ground-water flow model was used by Fairfield, and was approved by the District for use in this situation. The surficial aquifer system was correctly modeled as a single layer unit. Clay which underlies the Island is not a significant feature since, at minus 18 feet mean sea level, it is well into the saturated zone of the surficial aquifer and well below the surface water table, and since water levels actually observed in test wells could not be predicted when the top of the clay layer was used in the model as the bottom of the surficial aquifer. When the depth of the surficial aquifer was set at the top of the Hawthorne layer, the model accurately predicted water levels, as correlated against actual measured levels. Surface waters around Fort George Island have been classified as OFW since 1979. No significant development has taken place on the Island since 1979, and therefore ambient water conditions in 1978 and 1979 could reasonably be expected to have been what they are today. The stormwater management system will create a ground- water divide around the retention ponds. Any water falling inside the divide will flow toward the ponds; water falling outside the divide will percolate to the water table and then flow to the estuary. While under existing conditions nutrient pollutants that reach the water table simply flow to the estuary, after development half of the water falling on the golf course will be inside the divide and will therefore flow to the ponds. Therefore, after development there will be less nutrients and other pollutants reaching the estuary than under current conditions. Fairfield's stormwater management system is designed in a manner to ensure that the first 1 1/2 inches of rainfall will be retained or detained from an OFW. In fact, it appears that the system will actually retain runoff from the first 11 inches of rainfall. After analyzing data for metals, nutrients and coliform bacteria, it is found that the ambient water quality of the estuary will not be degraded by Fairfield's proposed development, and in fact there will actually be a net improvement in the quality of water reaching it from the Island. As a result of pollutant removal through filtration, sedimentation, absorption, precipitation, biological activity and dilution, it can reasonably be expected that ground-water seepage from the fairways and ponds to the OFW will meet primary and secondary drinking water standards, as well as Class II standards, and will not degrade the ambient water quality of the estuary. Infrequent surface discharges to the estuary also will not violate Class III standards. Total loading of nutrients to the OFW under developed conditions will be less than under existing conditions, and coliforms reaching the OFW via ground- water will be eliminated. Freshwater surface flow from the developed areas of the Island to the sloughs on the western side of the Island will be virtually eliminated. This elimination will not be detrimental to either salinities or particulate flows to these sloughs. Since there is an average of 50 inches of rainfall on the estuary per year, as opposed to less than 1/2 inch of freshwater runoff, and since the tidal flow is the forcing function in the estuary and not fresh surface water runoff, the salinity levels in the estuary will be largely unchanged. Particulate material will continue to be readily available to the sloughs from the marshlands, and from perimeter buffers which will be preserved by Fairfield around the Island. An undeveloped, preserved buffer zone is retained between the project and the surrounding waters as well as Rollins Sanctuary. This buffer zone is not intruded upon by the retention ponds contouring or berms associated with the development. In addition to the buffer zone, an undisturbed area will also be retained in the development, and the total acreage of the buffer and undisturbed areas will be 226 acres. The buffer and undisturbed areas will be more than adequate to protect the rare, notable, endangered or threatened plant and wildlife species identified on the Island when these areas are considered in relation to Rollins Sanctuary and other properties on the Island in state ownership. There will also be no construction activity in the saltmarsh off the western side of the Island. Extensive surveys conducted by Fairfield identified 26 species of plants and 16 species of wildlife on the Island. The habitat for all but one wildlife species, the gopher tortoise, is the saltmarsh to the west of the Island which will be undisturbed. Two national champion trees were identified and will be preserved. There will be no adverse impacts on notable plants in Rollins Sanctuary or other preservation areas since a 30 meter buffer is provided on the northern boundary of the Sanctuary and no development at all will take place to the west! of the Sanctuary. Woodstorks, the only endangered species identified in the survey, have been observed resting in trees at the western side of the Island in the saltmarsh. They are not nesting on Fort George Island, but return to the D-Dot Ranch south of Jacksonville every night to nest. The western area of the Island will remain undisturbed habitat in a buffer area from 250 to 450 feet wide, as will the southwestern portion of the Island. Woodstorks appear to be using the tidal sloughs for feeding, and development should have no adverse impact on these sloughs. A heron and egret rookery exists on the northern side of the Island, primarily off of Fairfield's property. Approximately 20 nesting pairs of great blue herons and great egrets use this rookery, which appears to be a satellite of regional rookeries. These are not notable species, but Fairfield will provide up to a 600 foot buffer. The gopher tortoise is the only notable terrestrial species on the Island and is a "species of special concern." The undisturbed natural habitat of a major concentration of gopher tortoise on Fairfield's property will be preserved. While the habitat for non-notable species such as bobcat, grey fox, owls and songbirds will be reduced, they will not be extirpated. Significant archaeological sites on Fairfield's property will be preserved and protected, including Mission San Juan del Puerto, the Grave Robbers Mound, the Sugar Mill site, and the Crypt site. If additional sites are found during development, a mitigation plan will be developed for approval by the State Division of Archives, with an evaluation by a professional archaeologist. Indian middens, or trash piles, have been deemed insignificant and will not be preserved. Surface water table draw-downs which will result from Fairfield's system due to pumping from the surficial aquifer will have no adverse impact on either wildlife or plant life on the Island. Such draw-downs will be limited and localized primarily around the ponds. In fact, the water table on the western side of the Island may increase slightly. The draw-down within Rollins Sanctuary or at Rollins Creek will be less than one foot and therefore should not have any adverse impact. Rollins Creek is approximately five feet wide. A fifty foot buffer around the Creek is provided. Only EPA approved chemicals will be used for weed control associated with the ponds, and aeration will be used to assist the production of oxygen in the ponds. Nutrients, nitrates and phosphorous, will be continually analyzed so that immediate corrective action in fertilizer application can be taken if necessary. Fairfield will utilize an integrated pest management program under a plan which must be approved by the District and which will actually reduce the need for chemical pesticides. Only EPA approved pesticides will be used. As for fertilizers, Fairfield will apply fertilizers more frequently, but in lesser amounts, than on the existing golf course. This ensures a better uptake of nitrates and phosphates, thereby reducing unabsorbed nutrients that might flow to the ponds or estuary. A full-time resource manager will be employed to ensure proper operation of the entire stormwater management system. Once the system is in place, Fairfield will conduct a long-term monitoring program of the water quality in the MWBZ, surficial aquifer, the ponds, and any surface water discharges to ensure permit compliance and also to provide a data base for further activities. Such a data base will represent a positive public benefit. Additional beneficial results of the project, after construction permits are obtained, include stabilization of the northern shoreline of the Island which has had notable marshland erosion, and re-aligning a road on the western side of in the Island to eliminate a point where it crosses Big Slough and thereby open the Slough up to additional sheetflow. Middle and Northern Sloughs will be preserved. Mitigation will be required for any disturbance of a small wetland area on the west side of the Island which is approximately 3/4 of an acre in size. Eliminating marsh erosion, and removing vehicle traffic and flow restrictions in the area of Big Slough are clearly in the public interest, as is the preservation of other wetland areas. The District staff originally recommended that Fairfield's MSSW application be denied but after modifications to the application were made, the District staff has recommended approval with conditions to ensure generally that Fairfield: Monitors water quality in the five ponds in accordance with a plan approved by the District, as well as the quantity and quality of all surface water discharges. Monitors water levels in surficial aquifer wells and reports such data to the District Recalibrates its surficial aquifer and water budget models every five years using the actual monitoring data it has collected and reported to the District in the preceding years, and if such recalibration indicates more than a 50% increase in the volume or frequency of surface water discharges, the stormwater management system must be altered, with District approval, to prevent such increases Submits a pesticide management plan for District approval. Submits a mitigation plan for District approval, at the time of application for construction permits, that will mitigate for any loss to off-site aquatic and wetland dependent species associated with project development in the area of the tidal sloughs on the west coast of the Island. A total of fourteen specific conditions which the District staff recommends be placed on the conceptual approval of the MSSW permit are contained in the Management and Storage of Surface Waters Summary Sheet, dated May 1986, which is hereby incorporated by reference and found to be reasonable in its entirety. Case Number 85-3596 (CUP) The following findings of fact are based upon the stipulation of the parties and relate to Fairfield's CUP application: The District, a special taxing district and agency, created by Chapter 373, is charged with the statutory responsibility for the administration and enforcement of permitting programs pursuant to Sections 373.219 and 373.223, Florida Statutes, and Chapter 40C-2, Florida Administrative Code. The District is the agency involved in this proceeding. The District has assigned Fairfield's CUP application the permit number 2-031-0021AN. Findings of Fact 10, 11, 14 and 15 which are set forth above are hereby readopted and incorporated herein. On December 1, 1983, Fairfield, through its then-agent George Register, III, submitted to the District the subject CUP application. The application was assigned No. 2-031-0021AN. On August 23, 1985, the District gave notice of its intent to deny CUP application No. 2-031-0021AN. On September 23, 1985, the District determined to recommend issuance of CUP application No. 2-031-0021AN, as then modified, with conditions. Fairfield had originally contemplated in both its original Master Resource Management Plan (MRMP) and the referenced CUP application that its proposed development for Fort George Island would have a 36-hole golf course facility. Fairfield subsequently reduced its proposed golf course facility from 36 holes to 27 holes. The City of Jacksonville's Planning Commission approved the MRMP with conditions, including the condition that the golf course be reduced, on January 29, 1986. Because of the reduction in size of Fairfield's proposed golf course facility form 36 to 27 holes, Fairfield's total requirements for irrigation water were reduced. By pleading dated February 28, 1986, Fairfield moved to amend its application. The motion was granted by the Hearing Officer on March 11, 1986. In light of this amended application, the District issued a revised "Consumptive Uses of Water Summary Sheet," dated March-24, 1986, to reflect this amended request and to recommend issuance of the CUP. The Petitioners' original Petition For Formal Administrative Proceedings was timely filed within fourteen (14) days of receipt of the District's proposed agency action of September 23, 1985. A number of the members of Friends of Fort George, Inc. own real property on Fort George Island, reside on the Island, and possess drinking water wells on the Island and engage in recreational activities on the Island and its adjacent waters and environs. The subject matter of the proposed agency action challenged by Petitioners and Intervenors concerns the water resources on Fort George Island, including its drinking water supply. Protection of this resource falls within the general purpose and objectives of Friends of Fort George, Inc., namely, the preservation, conservation and restoration of Fort George Island and surrounding environs. The relief requested in this proceeding by Petitioner and Intervenor is denial of the proposed consumptive use permit. The water storage ponds proposed in the project will intersect with the surficial aquifer on Fort George Island. The residential value of Petitioners' property on Fort George Island would decrease if the property had absolutely no access to potable water. Petitioners and Intervenors have standing pursuant to Section 403.412(5), Florida Statutes, to bring this action. The following findings of fact relating to Fairfield's CUP application are based upon the evidence presented, including the demeanor and credibility of witnesses who testified: Following review of Fairfield's CUP application, District staff requested additional information on January 11, 1984; Fairfield developed a plan of study to supply the requested additional information, and the plan of study was approved by District staff. The plan of study sought to find out the nature and characteristics of an anomaly in the northeastern part of the Island, and also to determine if Fairfield's proposed usage would have any affect on existing legal users. As part of the study, Fairfield conducted a well inventory and survey, water quality survey, water level measurements, and vertical investigations. The study also examined three alternatives to obtaining water from the various water bearing zones under Fort George Island, including drilling a test well (TP-2) into the Middle Water Bearing Zone after obtaining appropriate permits. The Floridan Aquifer below Fort George Island consists of three zones--The Upper Water Bearing Zone (UWBZ), Middle Water Bearing Zone (MWBZ) and Lower Water Bearing Zone (LWBZ). The bottom of the Hawthorne formation separating the surficial and Floridan aquifers occurs at about 400 feet below mean sea level. The UWBZ exists from of depth of approximately 520 feet to 1000 feet. Below the UWBZ is an upper semiconfining zone from a depth of approximately 1000 to 1200 feet. The MWBZ is generally 100 feet thick and exists from a depth of approximately 1200 to 1700 feet, below which is a lower semiconfining zone from a depth of approximately 1700 to 2000 feet. The MWBZ is a single water producing zone with interconnected channels or flow zones. The LWBZ exists from a depth of approximately 2000 to 2100 feet, below which is a lower confining unit. The confining zones are saturated with water but are less permeable than any of the water bearing zones. Regional ground-water flow in the Floridan Aquifer at Fort George Island is from the west to the east, northeast and southeast. Water quality to a depth of approximately 1900 feet is generally good, with chloride concentrations of less than 50 milligrams per liter (mgl). In the UWBZ chloride concentrations are generally 10-15 mgl. However, in the north eastern part of the Island chloride concentrations are approximately ten times higher, although still considered potable, due to an anomaly which exists in this area with a radius of approximately 1000 feet, and which allows the flow of water directly from the LWBZ to theMWBZ and LWBZ. While the potentiometric surface or pressure for most of the Island is 39 feet, at the anomaly it is 43 feet above mean sea level. The anomaly was caused either by a sinkhole or fault and acts as a localized conduit or coins source of lower quality water from the LWBZ to the UWBZ. No other point sources of lower quality water exist on the island. The Hawthorne formation was found to exist approximately fifty feet deeper in the area of the anomaly than on the rest of the Island. Existing users on Fort George Island draw water from the UWBZ. Fairfield proposes to draw its water from the MWBZ at a rate of 101.11 million gallons per year in an average year, and 181.04 million gallons per year in a 1 in 10 dry year, and will be the only user of water from the MWBZ on the Island. Household use consumption is projected to be 129.3 gallons per capita which is below the District average of 150 gallons per capita. Based upon pump tests already conducted by Fairfield, the MWBZ will produce more than enough water to meet Fairfield's needs for its project and such pumping will have no adverse impact on the UWBZ or existing users. Pumping from the MWBZ will also have no adverse impact on the MWBZ. Specifically, salt water intrusion from the surrounding estuary or from the tWBZ to the MWBZ will not significantly increase, chloride levels will not increase and potentiometric levels will not decrease in the MWBZ due to this pumping. The MWBZ will produce an adequate Supply of potable water for 15 to 30 years. Fairfield does propose to use well P-1 in the UWBZ in emergency situations but such usage will have no adverse impact on the quality of the UWBZ or its existing users. Use of the MWBZ will be minimized by maximum utilization of the surface water management system ponds for irrigation needs. Well TP-2 is approximately a mile from the anomaly in a south-southwesterly direction. It was constructed by Fairfield, after obtaining necessary permits, with casing to a depth of 771 feet all the way through the UWBZ and into the underlying confining bed. Pump tests were conducted on the MWBZ using TP-2, which is the only well on the Island in the MWBZ. No separate monitoring well in the MWBZ was required by the District, and none was utilized by Fairfield because the flow off 2,000 gallons per minute from TP-2 was so strong that a separate monitoring well was not necessary. When TP-2 was pumped, there was no measurable change in nearby UWBZ wells. This confirms that the MWBZ is hydrologically separate from the UWBZ, other than at the anomaly, and pumping from one will not affect wells in the other. In response to a request from the District, Fairfield utilized conservative factors in applying a mathematical model to determine the effects of its proposed pumping on the Floridan Aquifer. Using the USGS contaminant transport model, which is professionally accepted and appropriate for use in this case, and after proper calibration to reproduced observed conditions, it was determined that chloride concentrations in the MWBZ will not be adversely affected, nor will potentiometric surfaces of the UWBZ or MWBZ when pumping is conducted from TP-2 in the MWBZ over a thirty year period. At most, pumping from TP-2 could result in a slight increase of flow from the anomaly into the MWBZ, with a minimal increase in chloride concentrations. Fairfield has agreed to install a monitoring well in the MWBZ and to monitor several wells in the UWBZ in order to constantly test and monitor chloride levels. Currently chloride levels in the MWBZ are 25 mgl and the limit for potable water is 250 mgl. The monitoring well will be approximately 550 feet northeast of well TP-2, and will detect any changes in chloride levels with sufficient lead time for Fairfield to initiate action to drill another well into the MWBZ further from the chloride source. It is estimated that such lead time could reasonably be as much as ten years. Even without Fairfield's pumping from the MWBZ, water quality in the UWBZ would be expected to degrade, as it has historically, as a result of regional pumping which has caused a regional decline in water quality and 37 SO as a result of flow from the anomaly. Existing users may actually benefit from Fairfield's pumping from the MWBZ and the decline in the quality of the UWBZ may be slowed due to Fairfield's elimination of golf course irrigation which currently comes from the UMBZ at a rate of approximately 175,000 gallons per day, accounting for approximately 90% of all current water usage on the Island. Pumping from the Floridan Aquifer will be conducted to supplement irrigation from the stormwater management system. Fairfield will use up to 580,000 gallons per day for golf course irrigation in dry years. However, even in a dry year the primary source for golf course irrigation will still be from the stormwater management system. In an average year, approximately 95% of irrigation needs will be met by the surface water management system ponds. In a wet year there should be no need to pump from the Aquifer. The District staff originally recommended denial of Fairfield's CUP application when it was for a 36 hole golf course, anad for withdrawal of potable water from the UWBZ with only golf course irrigation being from the MWBZ. Fairfield has modified its application and now proposes a 27 golf course with all water needs coming from the MWBZ, except in an emergency when well P-1 in the UWBZ may be used. The District staff has now recommended approval, with a total of twenty conditions contained in the "Consumptive Uses of Water Summary Sheet," which are hereby incorporated by reference and which ensure generally that Fairfield: Mitigates any adverse impact caused by withdrawals permitted herein on existing legal uses of water; the District may curtail any withdrawal if there are adverse impacts on existing legal users. Mitigates any adverse impacts caused by withdrawals permitted herein on existing adjacent land uses; the District may curtail any withdrawal if there are adverse impacts on existing adjacent land uses. Must reapply for another CUP after seven years from issuance. Begins irrigating the existing 18 hole golf course from the MWBZ by March 1, 1987, with existing UWBZ irrigation wells only to be used thereafter for fire protection. Institutes a sampling program for existing wells in the UWBZ and MWBZ. Supplies all potable and supplemental irrigation requirements from the MWBZ, and keeps monthly records of such withdrawals. Drills and maintains a monitoring well in the MWBZ approximately 550 feet northeast of its MWBZ potable and supplemental irrigation well, and provides long term water quality samples to the District from the monitoring well. The District staff's recommended conditions are found to be reasonable in their entirety.
Recommendation Based on the foregoing, it is recommended that the St. John's River Water Management District issue to Fairfield Communities, Inc., conceptual approval of MSSW permit number 4- 031-002AC with conditions set forth in the District's Management and Storage of Surface Waters Summary Sheet, dated May 1986, and also issue to Fairfield Communities, Inc., CUP number 2-031- 3021AN with conditions set forth in the District's Consumptive Uses of Water Summary Sheet. Further, it is recommended that the Florida Wildlife Federation be dismissed as a party in this proceeding. DONE and ENTERED this 6th day of October, 1986, at Tallahassee, Florida. DONALD D. CONN, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of October, 1986. COPIES FURNISHED: Henry Dean, Executive Director St. Johns River Water Management Post Office Box 1429 Palatka, FL 32078-1429 Segundo J. Fernandez, Esquire Post Office Box 6507 Tallahassee, FL 32314 Thomas G. Pelham, Esquire Post Office Drawer 11300 Tallahassee, FL 32302-3300 Kathryn L. Mennella, Esquire Post Office Box 1429 Palatka, FL 32087-1429 Charles Lee Senior Vice President Florida Audubon Society 1101 Audubon Way Maitland, FL 32751 Jeffrey R. Lugwig, Esquire One Independent Square Jacksonville, FL 32276 Stephen O'Hara, Jr., Esquire 1500 American Heritage Life Building Jacksonville, FL 32202 APPENDIX Rulings on Petitioners' and Intervenors' Proposed Findings of Fact: 1. Adopted in Findings of Fact 9-27, 58-73. 2-7. Rejected as irrelevant and unnecessary 8. Adopted in Findings of Fact 36, 42. 9-10. Rejected as irrelevant and unnecessary 11. Adopted in part in Findings of Fact 4, 77, but otherwise rejected as irrelevant and unnecessary 12-24. Adopted in Finding of Fact 15, but otherwise rejected as unnecessary or not based on competent substantial evidence. 25-27. Rejected as irrelevant and unnecessary 28-39. Adopted and rejected in Finding of Fact 76, but otherwise rejected as irrelevant and unnecessary 40-45. Rejected in Findings of Fact 25, 77, 78 and otherwise not based on competent substantial evidence. Rejected in Finding of Fact 76. Rejected as irrelevant. 48-50. Rejected in Findings of Fact 77, 78 and otherwise not based on competent substantial evidence. 51-52. Rejected as unnecessary. 53. Rejected as not based on competent substantial evidence. 54-55. Rejected in Findings of Fact 77, 78. 56. Adopted in Finding of Fact 56. 57-63. Rejected in Finding of Fact 79 and otherwise not based on competent substantial evidence. 64-66. Rejected as irrelevant and unnecessary. 67-75. Rejected as irrelevant, unnecessary and otherwise not based on competent substantial evidence. 76-79. Rejected in Finding of Fact 79, and otherwise not based on competent substantial evidence. 80-83 Rejected in Finding of Fact 75, and otherwise irrelevant and not based on competent substantial evidence. Rejected in Finding of Fact 78 Rejected as irrelevant and unnecessary. 86-87. Rejected in Finding of Fact 75. 88-107. Adopted and rejected in part in Findings of Fact 75, 78, and otherwise irrelevant and not based on competent substantial evidence. 108. Rejected in Finding of Fact 79. 109-111. Rejected in Findings of Fact 76, 80. Adopted in Finding of Fact 80. Rejected as irrelevant and unnecessary. 114-116. Adopted in Finding of Fact 80. 117-120. Rejected as irrelevant and not based on competent substantial evidence. 121-136. Rejected in Finding of Fact 37 and otherwise unnecessary and not based on competent substantial evidence. Rejected as not based on competent substantial evidence. Rejected as unnecessary and cumulative. 139-141. Rejected as not based on competent substantial evidence. 142-144. Rejected as unnecessary and cumulative. 145-147. Rejected as not based on competent substantial evidence. Rejected in Findings of Fact 36, 37. Rejected as unnecessary and cumulative. Rejected as not based on competent substantial evidence 151-161. Rejected as unnecessary, cumulative and not based on competent substantial evidence. 162-164. Rejected in Finding of Fact 37 and otherwise not based on competent substantial evidence. 165-169. Rejected as unnecessary and cumulative. 170. Rejected in Findings of Fact 34, 39, 41. 171-173. Rejected as unnecessary and cumulative. 174-177. Rejected in Findings of Fact 36, 37. 178-179. Rejected in Findings of Fact 50, 51. 180. Adopted in Finding of Fact 39. 181-186. Rejected as not based on competent substantial evidence and otherwise unnecessary. 187-189. Rejected in Finding of Fact 32, and otherwise not based on competent substantial evidence. 190-193. Rejected as unnecessary and cumulative. 194-195. Rejected as not based on competent substantial evidence. 196. Rejected as unnecessary. 197-200. Rejected as not based on competent substantial evidence. 201-205. Rejected in Findings of Fact 32, 33 and otherwise not based on competent substantial evidence. 206-210. Rejected in Findings of Fact 32, 33, 36, 37. 211-268. Rejected in Findings of Fact 35, 36, 39-41, 52-54 and otherwise unnecessary and contrary to competent substantial evidence. 269-278. Adopted in part in Finding of Fact 3, but otherwise rejected as unnecessary. 279-297. Rejected in Findings of Fact 32, 33, 35, 36, 41, 42 and otherwise as unnecessary. 298. Rejected as irrelevant and unnecessary. 299-300. Adopted in part in Finding of Fact 3. Rejected as unnecessary. Rejected in Finding of Fact 44. Adopted and rejected in part in Findings of Fact 45-47. 304-305. Adopted in Finding of Fact 4. 306-312. Rejected in Findings of Fact 44-48 and otherwise not based on competent substantial evidence. Rejected in Findings of Fact 43, 45. Rejected in Finding of Fact 48. 315-321. Rejected as unnecessary and not based on competent substantial evidence. 322-323. Adopted and rejected in part in Finding of Fact 50. 324. Rejected as unnecessary. 325-329. Adopted and rejected in part in Finding of Fact 28. 330. Rejected as unnecessary. Rulings on Respondent Fairfield Communities' Proposed Findings of Fact: Adopted in Findings of Fact 9, 58. Adopted in Findings of Fact 10, 59. Adopted in Findings of Fact 11, 59. Adopted in Findings of Fact 15, 59. Adopted in Finding of Fact 12. Adopted in Findings of Fact 13, 27. Adopted in Findings of Fact 14, 59. Rejected as unnecessary based on Finding of Fact 28 Adopted in Findings of Fact 30, 60. Adopted in Findings of Fact 16, 17, 61, 62. Adopted in Findings of Fact 4, 6, 18, 19 Adopted in Findings of Fact 20, 65. Adopted in Finding of Fact 26. Adopted 1n Findings of Fact 21, 67. Adopted and rejected in Finding of Fact 28 Adopted in Finding of Fact 28. Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3. 20-22. Adopted in Finding of Fact S. 23-24. Adopted in Finding of Fact 6. Adopted in Finding of Fact 7. Adopted in Finding of Fact 8. Adopted in Finding of Fact 77, 81. 28-30. Adopted in Finding of Fact 74. Adopted in Finding of Fact 75. Adopted in Findings of Fact 75, 76 Adopted in Finding of Fact 76. Adopted 1n Findings of Fact 75, 76. Rejected as unnecessary. 36-37. Adopted in Finding of Fact 75. 38. Adopted in Finding of Fact 77, but otherwise rejected 39-40. Adopted in Finding of Fact 76 evidence. 41-43. Adopted in Findings of Fact 76-80, but otherwise rejected as cumulative and unnecessary. 44-47. Adopted in Finding of Fact 74 48-50. Adopted in Finding of Fact 78 51-55 Adopted in Finding of Fact 79. Rejected as unnecessary. Adopted in Findings of Fact 77, 80. Adopted in Findings of Fact 77, 83. Adopted in Finding of Fact 80. Adopted in Findings of Fact 78, 79. Adopted in Finding of Fact 79. 62-63. Adopted in Finding of Fact 81. 64-65. Adopted in Finding of Fact 77 Adopted in Findings of Fact 4; 77. Adopted in Finding of Fact 82. Adopted in Finding of Fact 82, but otherwise rejected as unnecessary. 69-70. Rejected as unnecessary and cumulative 71-72. Adopted in Finding of Fact 30. 73-75. Adopted in Finding of Fact 31 76-84. Adopted in Findings of Fact 31, 32, but otherwise rejected as unnecessary 85-88. Adopted in Finding of Fact 33. 89-92. Adopted in Findings of Fact 36, 37, but otherwise rejected as unnecessary. Adopted in Finding of Fact 34. Adopted in Finding of Fact 82, but otherwise rejected as unnecessary. Rejected as unnecessary Adopted in Finding of Fact 43 Adopted in Finding of Fact 36 Adopted in Findings of Fact 4i, 42 Adopted in Findings of Fact 2, 38 Adopted in Findings of Fact 41, 42. 101-102. Adopted in Finding of Fact 39 Adopted in Finding of Fact 40. Adopted in Finding of Fact 35. 105-105. Adopted in Finding of Fact 41. 110-115. Adopted in Finding of Fact 42 116-117. Adopted in Findings of Fact 36, 42, but otherwise rejected as unnecessary. 118-121. Adopted in Finding of Fact 50, but otherwise rejected as unnecessary 122. Rejected as unnecessary, cumulative and inaccurate. 123-125. Rejected as cumulative and unnecessary. Adopted in Findings of Fact 29, 31. Adopted in Finding of Fact 43. 128-131. Adopted in Finding of Fact 56. 132-133. Adopted in Finding of Fact 36. 134-135. Adopted in Finding of Fact 56, but otherwise rejected as unnecessary. 136. Adopted in Finding of Fact 51. 137-138. Adopted in Finding of Fact 35. Adopted in Finding of Fact 36. Adopted in Finding of Fact 52. Adopted in Findings of Fact 52, 53. Adopted in Finding of Fact 54. Adopted in Finding of Fact 55. 144-148. Adopted in Finding of Fact 44, but otherwise rejected as unnecessary. 149. Adopted in Findings of Fact 4, 43, 44, but otherwise rejected as unnecessary. 150-151. Adopted in Finding of Fact 45. Rejected as unnecessary. Adopted in Finding of Fact 45. 154-155. Adopted in Finding of Fact 46. Adopted in Finding of Fact 47. Adopted in Finding of Fact 48. 158-160. Adopted in Finding of Fact 49. Rulings on Respondent St. John's River Water Management District's Proposed Findings of Fact: (The District's proposal was not timely filed, and the District did not seek permission from the Hearing Officer for late filing. It also consists of serial, unnumbered paragraphs from pages 18 to 48 despite specific instruction of the Hearing Officer to the parties to number paragraphs in proposed findings in order to allow specific rulings to be made. Despite these failures, a ruling will be made on the District's proposals, after having consecutively numbered each unnumbered paragraph, since counsel for the District indicates counsel for Petitioners has no objection to this late-filing, and in fact no Motion to Strike has been filed on behalf of Petitioners.) Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 4. Adopted in Finding of Fact 75. Adopted in Finding of Fact 76. Adopted in Findings of Fact 77, 81. Adopted in Finding of Fact 60. Adopted in Finding of Fact 30.47 Adopted in Findings of Fact 16, 17. Adopted in Finding of Fact 18. Adopted in Finding of Fact 6. Adopted in Findings of Fact 66, 83. Adopted in Finding of Fact 83. Adopted in Finding of Fact 20. 15-16. Adopted in Finding of Fact 57. 17. Adopted in Findings of Fact 21, G7. 18-21. Adopted in Finding of Fact 74. Adopted in Findings of Fact 74-76. Adopted in Finding of Fact 74. 24-26. Rejected as irrelevant and unnecessary. 27. Adopted in Finding of Fact 77. 28-35. Adopted in Finding of Fact 76. 36-41. Adopted in Finding of Fact 78. 42. Adopted in Finding of Fact 80. 43-45. Adopted in Finding of Fact 79. Adopted in Finding of Fact 75. Adopted in Findings of Fact 75, 79. Adopted in Finding of Fact 79. 49-50. Adopted in Finding of Fact 81. 51-52. Adopted in Finding of Fact 79. Adopted in Finding of Fact 80. Adopted in Finding of Fact 79. Adopted in Finding of Fact 77. Adopted in Finding of Fact 81. 57-58. Adopted in Finding of Fact 77. Adopted in Findings of Fact 34, 82. Rejected as unnecessary. Adopted in Finding of Fact 77. Rejected as unnecessary and cumulative. Adopted in Finding of Fact 78. 64-65. Adopted in Finding of Fact 30. 66. Adopted in Findings of Fact 34, 39. 67-72. Adopted in Finding of Fact 31. 73-81. Adopted in Finding of Fact 32. 82. Adopted in Findings of Fact 36, 42. 83-84. Adopted in Findings of Fact 32, 33. 85-87. Adopted in Finding of Fact 33. 88-94. Rejected as unnecessary. 95. Adopted in Finding of Fact 37. 96-98. Adopted in Finding of Fact 36, but otherwise rejected as unnecessary. Adopted in Finding of Fact 54. Adopted in Findings of Fact 34-36. 101-102. Rejected as unnecessary and cumulative. Adopted in Findings of Fact 2, 38. Rejected as unnecessary and cumulative. Adopted in Findings of Fact 36, 39. Adopted in Finding of Fact 39. Adopted in Findings of Fact 41. Adopted in Finding of Fact 35. Rejected as unnecessary. 110-118. Adopted in Finding of Fact 41, but otherwise rejected as unnecessary. Adopted in Finding of Fact 53. Adopted in Findings of Fact 52, 53, but otherwise rejected as unnecessary. Adopted in Finding of Fact 55. Adopted in Finding of Fact 42. 124-128. Adopted in Findings of Fact 32, 36, 42, but otherwise rejected as unnecessary. Adopted in Findings of Fact 35, 42, but otherwise rejected as unnecessary. Rejected as unnecessary. 131-134. Adopted in Finding of Fact 50, but otherwise rejected as unnecessary. 135. Adopted in Findings of Fact 42, 43. 136-138. Adopted in Finding of Fact 56. 139. Adopted in Findings of Fact 36, 56. 140-141. Adopted in Finding of Fact 56. 142. Adopted in Finding of Fact 51. 143-144. Adopted in Finding of Fact 35. Adopted in Finding of Fact 36. Rejected as cumulative, unnecessary and incorrect. Adopted and rejected in part in Finding of Fact 28. Adopted in Finding of Fact 28. ================================================================ AGENCY FINAL ORDER ================================================================ IN THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT FRIENDS OF FORT GEORGE, INC., Petitioners, and LOGAN DIVING, INC., SOUTHEASTERN FISHERIES ASSOCIATIONS, INC., THE FLORIDA AUDUBON SOCIETY, THE DOAH Case No. 85-3537 DUVAL AUDUBON SOCIETY, and THE (Management and Storage FLORIDA WILDLIFE FEDERATION, of Surface Waters) SJRWMD Case No. 85-3948 Intervenors, v. FAIRFIELD COMMUNITIES, INC., and ST. JOHNS RIVER WATER, MANAGEMENT DISTRICT, Respondents. / FRIENDS OF FORT GEORGE, INC., et al., Petitioners, and THE FLORIDA AUDUBON SOCIETY DOAH Case No. 85-3596 and THE DUVAL AUDUBON SOCIETY, (Consumptive Use Permit) SJRWMD Case No. 85-394A Intervenors, v. FAIRFIELD COMMUNITIES, INC., and ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, Respondents. /