SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs TONY HOLT, 99-001609 (1999)
Division of Administrative Hearings, Florida Filed:Brooksville, Florida Apr. 05, 1999 Number: 99-001609 Latest Update: Oct. 04, 1999

The Issue The issues are whether Respondent violated Rule 62-532.500(2)(d)1., Florida Administrative Code, by failing to seat a well casing in a rock layer or other such consolidated formation, and if so, what penalty should be imposed.

Findings Of Fact Respondent is charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. Respondent's duties include the regulation of water wells and water well contractors. Respondent is a water well contractor. As such, he holds Water Well Contractor License No. 2215. On September 25, 1997, Petitioner issued Respondent Well Construction Permit No. 597679.01. The permit gave Petitioner permission to construct a water well, four-inches in diameter, on property owned by Rex Hobbs in Pasco County. Respondent subsequently constructed the water well on the property owned by Mr. Hobbs, using the cable tool construction method. Respondent completed construction of the well on or about October 20, 1997. After the well was constructed, Mr. Hobbs complained to Respondent on several occasions that the well was producing sand, rock, and other debris. Respondent made no attempt to repair the well. In May or June of 1998, Mr. Hobbs filed a complaint with Petitioner regarding the construction of the well on his property. Petitioner's subsequent field investigation did not reveal a significant amount of sediment in the well water. Mr. Hobbs filed a second complaint with Petitioner in the summer of 1998, insisting that the water from his well contained an excess amount of sediment. Petitioner's second field investigation revealed an abnormal amount of sediment in the well water. On July 9, 1998, Petitioner issued a Notice of Violation, advising Respondent that he had violated Rule 40D-3.037(1), Florida Administrative Code, by failing to seat the casing of the Hobbs well into a consolidated formation. Water from the Hobbs well contains sediments including sand, rock, and other debris. These sediments interfere with the operation of plumbing, appliances, and irrigation devices, which utilize water supplied by the well. The quality of the well water produced by the Hobbs water well is unacceptable. The total depth of the Hobbs well is 131 feet below land surface. The well is cased to 42 feet below land surface. The water pump is set at 84 or 86 feet below land surface. The static water level was 58.2 feet below the land surface. The geologic formation at the end of the casing of the well contains gray clay, yellow clay, limerock, and sand. The end of the casing is not seated in a layer of rock or other consolidated formation. There is no persuasive testimony to the contrary. The area in which the well is located is geologically unstable. Wells in that area generally require 84 feet of casing. Respondent admitted at the hearing that the well is producing sand and needs more "pipe." Failure to seat a well casing into a consolidated formation is a major violation under the Florida Department of Environmental Protection's Water Well Contractor Disciplinary Guidelines and Procedures Manual. Respondent has entered into three previous Consent Orders with Petitioner to resolve permitting and construction violations.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That Petitioner enter a final order requiring Respondent to pay an administrative fine in the amount of $500 and assessing five points against his water well contractor's license. DONE AND ENTERED this 18th day of August, 1999, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 18th day of August, 1999. COPIES FURNISHED: Margaret M. Lytle, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Tony Holt 6145 Durant Road Durant, Florida 33530 E. D. Sonny Vegara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (10) 120.569120.57373.046373.302373.303373.308373.309373.316373.323373.333 Florida Administrative Code (1) 40D-3.037
# 1
L. C. PREVATT, D/B/A RIVERVIEW SPEED WASH, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-000356 (1982)
Division of Administrative Hearings, Florida Number: 82-000356 Latest Update: Oct. 07, 1982

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Petitioner L. C. Prevatt is the owner and operator of the Riverview Speed Wash, Inc., a coin operated laundry which has been in existence for over ten years. The facility has twelve top load washers, four double load washers, one triple load washer and seven gas dryers. It is open from 7:00 a.m. to 9:00 p.m., seven days a week. The facility is located in a shopping center in space which petitioner rents on a month-by-month basis. The facility utilizes a 0.0075 mgd waste treatment plant with effluent disposal to a county-owned drainage ditch which is connected and discharges to the Alafia River approximately 0.6 miles south of the facility. On or about May 29, 1981, petitioner submitted an application for a temporary operation permit for his Riverview laundry facility. Temporary operation permits are issued by the DER when a facility is not currently meeting State water quality standards and the applicant needs or desires a period of time to bring the facility up to the applicable standards. Here, the petitioner stated on his application that no upgrade of the waste treatment facility was planned. The application further stated that the facility would be connected to an area wide regional waste treatment system when that system became available. After numerous requests for further information from the applicant and various inspections of the facility, the DER issued its notice of intent to deny petitioner's application for a temporary operation permit. Reasons for the intended denial included failure to provide requested background water quality information, failure to provide a proposed water quality standards compliance schedule, failure to provide reasonable assurance that a municipal sewer would be available as an alternative means of disposal and improper and deficient operation and maintenance of the facility. Numerous inspections of the petitioner's facility by personnel from the DER and the Hillsborough County Environmental Protection Commission revealed that the facility was not functional in terms of operating correctly and that the design of the plant was inadequate to meet State water quality standards. Specifically, these inspections revealed that the chlorination equipment was not operational, that the trickling filter was not operational, that the removal rates for BOD and suspended solids were consistently and significantly less than the State standard of 90 percent, that the discharge and effluent were of a milky color and would not meet the State standards for turbidity and color, that the water quality of the drainage ditch was extremely low and that the water quality results were actually worse after going through the existing system. It was determined that the discharge was degrading the quality of the receiving waters and that, even if the petitioner's operational and maintenance problems were solved, the design of the facility is not adequate to assure future compliance with State standards. Petitioner admits that his facility does not currently meet State water quality standards. In mitigation, it is contended that many other laundries in the area also do not meet State standards, that it is not economically feasible to redesign the facility to attain compliance, that he has no land available upon which to discharge effluent and that he would be willing to install a sand filter and did have the permission of the manager (not the owner) of the property to discharge effluent into the parking lot drain ponds. No written evidence of this agreement was adduced and there was no demonstration that such runoff ponds would be able to hold and/or treat effluent from the petitioner's facility. There was also no evidence offered to demonstrate that a municipal or regional sewer system would be available in the near future to serve the laundry facility.

Recommendation Based upon the findings of fact and conclusions of law recited above, it is RECOMMENDED that petitioner's application for a temporary operation permit for Riverview Speed Wash, Inc. be DENIED. Respectfully submitted and entered this 7th day of September, 1982, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of September, 1982. COPIES FURNISHED: L. C. Prevatt Post Office Box 998 Gibsonton, Florida 33534 William W. Deane, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 403.088
# 2
LOIS SIMPSON vs. JOHN H. VOORHEES AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-000599 (1986)
Division of Administrative Hearings, Florida Number: 86-000599 Latest Update: Feb. 17, 1987

Findings Of Fact The Department of Environmental Regulation (hereinafter "DER") issued a letter of "intent to issue" a permit based upon an application submitted by Respondent John H. Voorhees for a weedgate and associated fences to be placed at the mouth of the Hollerich Subdivision canal in Big Pine Key, Monroe County, Florida. The majority of owners of lots in the Hollerich Subdivision are in favor of the gate. The Hollerich Subdivision canal is approximately 1,200 feet long. it is an east-west dead-end canal with its mouth facing east. Floating seaweeds, grasses and detritus (a/k/a wrack are blown into the canal by the prevailing east and southeast winds. Although some surface wrack may blow back out of the canal with the occasional west wind, the sunken weeds will not. The accumulation of windblown wrack results in a stench caused by hydrogen sulfide gas from rotting weeds. The odor causes nausea, sore throats, and sneezing. Water quality tests of dissolved oxygen (DO) taken both in April 1985 and in November 1986 show the water in the canal to be below state standards. The low DO levels found in the canal are primarily due to the rotting weeds although the nutrients leaching from the surrounding yards also contribute to those low levels. The area outside the canal is better able to diffuse and absorb the wrack problem than the area inside the carnal. Accumulations of wrack outside the canal are more temporary and therefore produce less navigational difficulty and less deterioration of water quality. The navigational problems caused by weeds choking the canal range from difficulty in steering to poor visibility. The decaying wrack also causes growth on boat bottoms, can damage boat cooling systems, and turns the water in the canal red. The amount of wrack entering the canal and accumulating there has been increasing over the last five years. The proposed structure will stop wrack from entering the canal and will function as a weedgate. The design of the gate will not cause any navigational hazards, although the weedgate should have navigational aids to assure safety. Although the weedgate will not improve water quality in the canal so as to meet state standards, it will result in an improvement. DER has no jurisdiction to resolve property disputes. The proposed weedgate is to be placed in front of the canal with no on-land attachments, and Respondent Voorhees has given reasonable assurances that the proposed gate is not on privately owned property. The proposed structure will be placed in Class III Outstanding Florida Waters. DER has balanced the positive public interest effects that will accrue to the owners of property along the canal against the' negative public interest effects that may accrue to owners of property at the mouth of the canal. Respondent Voorhees has given reasonable assurances that the project will be clearly in the public interest. Respondent Voorhees has given reasonable assurances that the proposed project will meet all applicable DER rules and standards.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that a Final Order be entered (1), granting Respondent Voorhees' permit application and (2), authorizing the issuance of a permit subject to all permit conditions contained in the Department's letter of Intent to Issue the permit and also including the condition that no trespassing occur on the property at the mouth of the canal attendant to either the construction or the maintenance of the weedgate and associated fences. DONE and RECOMMENDED this 17th day of February, 1987, at Tallahassee, Florida. LINDA M. RIGOT, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of February, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NOS. 86-0599, 86-0600, 86-0601, 86-0954, and 86-0955 l. Respondent Department of Environmental Regulation's proposed findings of fact numbered 1-5, 9, 10, 12-15, 17-20, the first and last sentences of 21, 23, 28, and 29 have been adopted in this Recommended Order either verbatim or in substance. The remainder of the Department's proposed findings have been rejected as follows: 6-8, 11 and 16, as being unnecessary for determination herein; the remainder of 21 and 22 as being immaterial to the issues herein; and 24-27 as being subordinate. 2. Respondent Voorhees' proposed findings of fact numbered l, 3, 8, and 13 have been adopted in this Recommended Order. The remainder of Voorhees' proposed findings of fact have been rejected as follows: 2 and 16 as being subordinate; 9 and 10 as being unnecessary; and 11, 12, 14 and 15 as not being supported by the evidence in this cause. COPIES FURNISHED: Douglas H. MacLaughlin, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 John H. Voorhees Route 1, Box 612 F Big Pine Key, Florida 33043 H. Ray Allen, Esquire 618 Whitehead Street Key West, Florida 33040 Dale Twachtmann Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 120.57
# 3
THOMAS A. DRISCOLL vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, ENGLE HOMES AND LAKE BERNADETTE, INC., 01-002471 (2001)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 25, 2001 Number: 01-002471 Latest Update: Dec. 03, 2001

The Issue The ultimate legal and factual issue in this matter is whether Engle Homes, Inc., and Lake Bernadette, Inc. (Permittees), have provided the Southwest Florida Water Management District (District) with reasonable assurances that the activities they propose to conduct pursuant to Management and Storage of Surface Water (MSSW) General Construction Permit No. 49005837.017 (the Permit) meet the conditions for issuance of permits established in Rules 40D-4.301, 40D-4.302, and 40D- 40.302, Florida Administrative Code. In particular, the issues of fact to be litigated are whether the Project will cause adverse water quality impacts to receiving waters and adjacent lands; whether the Project will cause adverse flooding of on-site or off-site property; whether the Project will cause impacts to existing surface water storage and conveyance capabilities; and whether the Project will adversely affect the property of others.

Findings Of Fact The Parties Engle Homes, Inc., and Lake Bernadette, Inc., are corporations licensed to operate in the State of Florida. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries pursuant to Chapter 373, Florida Statutes, and the rules promulgated thereunder as Chapter 40D, Florida Administrative Code. Driscoll resides at 35716 Welby Court, Zephyrhills, Florida 33541, Lot 14, within the Timber Creek 2 Subdivision (Subdivision). Driscoll requested this hearing to show the District that there is a drainage problem on Lots 13 and 14, and the adjacent Geiger property to the south, which should be fixed at this time and as part of the Project. Driscoll wants "Engle Homes to propose a new solution to fix the entire Welby Court Geiger property problem," i.e., from Lots 4 through 14, and not a piecemeal solution as proposed in the Permit modification. The Subdivision Engle Homes, Inc., and Lake Bernadette, Inc., developed the Timber Creek 2 Subdivision. Lots 15 through 25 run east to west and are north of Welby Court. Lots 15 and 16 are located north of the cul-de-sac, on the eastern portion of Welby Court. Lots 3 through 14 run west to east, south of Welby Court. Lots 13 and 14 are south of the cul-de-sac on the eastern portion of Welby Court and are across the street and the cul-de-sac from Lots 16 and 15, respectively. Residences exist on Lots 5, and 7 through 14. Driscoll owns Lot 14, a corner lot, which is the southeastern most lot of the Subdivision. Don Geiger (Geiger) owns the land (approximately five acres) south of the property lines of Subdivision Lots 5 through Geiger's northern driveway, essentially a dirt road, runs parallel to Lots 5 through 14. Subsequent to the original construction activity involving the Subdivision, the developer realized that there was an "existing depression" (referenced on Engle Exhibit number 1), south of Lots 7 and 8, and on Geiger's property. Geiger complained to the District about standing water in this area. This depression area is approximately 90 feet long and 30 feet wide which needed to be "drained off" according to Geiger. The depressed area on Geiger's property was most likely caused when Lots 7 through 14 were graded and sodded, which raised the "lots up a few inches" above Geiger's driveway/property. Water is trapped during a storm event between the back yards and the depressed area. As a result, the southern end of the back yards, particularly Lots 7 and 8, and the driveway remain constantly wet. The Project On January 16, 2001, Engle Homes, Inc., and Lake Bernadette, Inc., filed MSSW Permit Application No. 49005837.017 with the District, to address the problems with the rear lot grading and the adjacent property. The actual Project area for the permit modification1 includes the southern portions of Lots 4 through 9 and south of the property lot line including Geiger's property. See Finding of Fact 5. The modified permit does not address the drainage area including the back yards of Lot 13 and Driscoll's Lot 14, and the other portion of Geiger's property/driveway to the south. On April 5, 2001, the District issued MSSW Permit No. 49005837.017 to Engle Homes, Inc., and Lake Bernadette, Inc., under the provisions of Chapter 373, Florida Statutes, and Chapter 40D-40, Florida Administrative Code, for the modification of a surface water management system to serve the Project area. The proposed Project will involve the construction of a concrete inlet box with a safety grate, storm sewers, and grass swales. Specifically, the project is intended to solve the drainage problems associated with the "existing depression" south of the boundary line for Lots 7 and 8 on Geiger's property (although Lots 4 through 9 ("area 1") are included within the Project area), and the back yards of Lots 7 and 8. A catch basin is proposed to be located south and on the lot line between Lots 8 and 9, which is expected to drain off the water in the depression area to the modified surface water management system. The inlet box will be placed in the corner between Lots 8 and 9. The collected water in the inlet box will be routed underground through a series of 18-inch storm sewer pipe straight north through a drainage easement between Lots 8 and 9 to Welby Court. The underground pipe ties into an existing pipe in front of Lot 9 on the street, then runs east along the Welby Court right-of-way and then north between Lots 19 and 20, and eventually north into a large permitted retention pond, located to the north of the Subdivision which will handle the stormwater. Driscoll's Alleged Drainage Problem There is another distinct drainage area, i.e., "area 2," which includes Geiger's property and the southern portions of Lots 13 and 14, where water drains from south to north into a roadside ditch to Geiger Cemetery Road ("area 3"), which runs south to north and east of Lots 14 and 15. During a September 2001 tropical storm, there was standing water on Geiger's driveway, directly south of Lots 13 and 14, which was present for more than 3 days. This was referred to by Mr. Barrett as a "small drainage problem that could easily be corrected." On the other hand, Geiger says that there is standing water on his driveway, south of Lots 13 and 14, "all the time." This caused Geiger to move his driveway "50 or 60 feet" south. According to Geiger, the berm, which runs across Lots 10 through 14, should be lowered and the backyards reconfigured. But this would be quite disturbing to the neighbors. Therefore, Geiger recommends the placement of drains south of Lots 13 and 14, which would direct the water out to the ditch at Geiger Cemetery Road and away from Driscoll's Lot 14. The modified Permit is not intended to solve this problem, although Driscoll wants this problem fixed. It is not necessary to resolve Driscoll's issue regarding whether there is a drainage problem in and around Driscoll's lot. The two drainage areas 1 and 2 discussed herein are not connected, although they are close in proximity. The solution to the first problem has no impact on the second, and there is no cited statutory or rule requirement that both issues must be addressed in this Permit application. This is Driscoll's quandary. Compliance with Rules 40D-4.301 and 40D-4.302, Florida Administrative Code The Project will not impact wetlands or surface waters. The Project will not adversely impact the value of functions provided to fish and wildlife, and listed species, including aquatic and wetland-dependent species, by wetlands or other surface waters and other water-related resources. The Project will not adversely impact the quality of receiving waters such that the water quality standards will be violated. The Project will not cause adverse secondary impacts to the water resources. The Project will not adversely impact the maintenance of surface or groundwater levels or surface water flows established pursuant to Section 373.042, Florida Statutes. The Project will not cause adverse impacts to a work of the District. The Project is capable, based on generally accepted engineering and scientific principles, of being effectively performed and of functioning as proposed. The Project will be conducted by an entity with financial, legal, and administrative capability of ensuring that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued. The Project will comply with any applicable special basin or geographic area criteria established pursuant to Chapter 40D, Florida Administrative Code, by the District. The Project will not adversely affect the public health, safety, or welfare. The Project will not adversely impact the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The Project will not adversely affect navigation. The Project will not cause harmful erosion or shoaling. The Project will not adversely affect fishing or recreational values or marine productivity in the vicinity of the Project. The Project will not adversely affect significant historical and archeological resources. The Project will not cause unacceptable cumulative impacts upon wetlands and other surface waters. The Project area is less than 100 acres. The Project does not require dredging or filling of wetlands, or construction of boat slips. The Project is not contrary to the public interest. The Project will not cause adverse water quantity impacts to receiving waters and adjacent lands, and will not adversely affect or impact the property of others, including Driscoll's property, Lot 14. "Area 1," between Lots 4 and 9, is a separate drainage area, and the water from this area does not drain to Lot 14. Driscoll's property is not within the Project area, and the Project was not intended to resolve his alleged drainage problem. The Project will not cause adverse flooding to on-site or off-site property. The Project will not cause adverse impacts to existing surface water storage and conveyance capabilities. Rather, the project is expected to improve the conveyance of water and drainage for "area 1" and the Project area.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order issuing Management and Storage of Surface Water General Construction Permit No. 49005837.017. DONE AND ENTERED this 24th day of October, 2001, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of October, 2001.

Florida Laws (2) 120.569373.042
# 4
DONALD SENKOVICH vs. JEFFREY DAVID EVANS AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-001102 (1981)
Division of Administrative Hearings, Florida Number: 81-001102 Latest Update: Nov. 30, 1981

Findings Of Fact The Respondent/Applicant, Jeffrey David Evans, applied to the Department of Environmental Regulation and the Army Corps of Engineers for a permit to construct a dock and boathouse as depicted on Respondent's Exhibit 1. The proposed length of the dock and boathouse is sixty feet from the seawall marking the landward boundary of the Halifax River and the waterward boundary of the Respondent/Applicant's property. The Department of Environmental Regulation advised Evans as well as the protesting Petitioner on March 9, 1981, of its intent to issue the permit. The Army Corps of Engineers issued a general permit numbered SAJ-20(MOD) on September 4, 1979, also authorizing construction of the proposed dock with the condition that it not extend in a waterward direction to a water depth contour deeper than four feet at mean low water. The Petitioner herein timely petitioned for a hearing protesting the decision by the DER to grant the permit. The parties do not dispute and indeed have stipulated that there will be no adverse impact on the conservation of fish and wildlife in the area and no significant chemical, biological or physical alteration of the state waters and marine or aquatic life involved. In short, it was stipulated that there are no adverse environmental impacts of any kind to be occasioned by construction of the project. Mr. James Morgan of the Department staff was qualified as an expert witness in aquatic ecology and the evaluation of dredge and fill projects. He testified at the hearing and established that the Respondent/Applicant had provided affirmative reasonable assurances to the Department that the proposed project would not result in any violations of state water quality standards and that the proposed project would not result in interference with the conservation of fish and wildlife in the subject area or the capability of the local aquatic habitat to support such fish and wildlife. Mr. Morgan also testified that reasonable assurances had been provided by the Respondent Applicant that the proposed project would not create a navigational hazard or a serious impediment to navigation, and that an unobstructed navigable channel would remain after the project was constructed. There being no question that affirmative reasonable assurances have been provided that no state water quality standards will be violated and that no other adverse environmental impacts will occur within the purview of Chapter 403, Florida Statutes, or Chapter 17, Florida Administrative Code; the permit in this regard should be granted. A question remains, however, regarding the maximum length the dock should achieve in a perpendicular direction from the seawall of the Respondent/Applicant's property out into the river. Evidence propounded by the Department regarding a six-foot water depth off the end of the proposed sixty- foot dock site is based upon hearsay information received from a Department employee other than the witness who testified, who in turn received it through a telephone conversation with, another party with no evidence that soundings or other types of survey were made. Mr. Evans' own testimony establishes that he measured some six and eight-foot depths in the natural channel involved herein, but his testimony is not specific enough in reflecting at what points in that channel, in relation to the site of the proposed dock, he measured those depths nor at what stage of the tide he measured them. It is established in the record that there is approximately a one-foot rise and fall between mean low water and mean high water at the subject site. The only access by navigation to the Petitioner's home from the main channel of the Intracoastal Waterway is by means of a natural channel running in a northerly direction parallel and immediately in front of the Petitioner's home and the applicant's home and inshore from a large sand bar covered with oysters which is a permanent oyster bar protruding from the water at low tide. The channel continues from the Petitioner's home northerly and parallel to the applicant's home and seawall until it reaches the northern terminus of the sand bar. From that point a boat navigating the channel can turn out into the main channel of the Intracoastal Waterway. Unrefuted evidence propounded by the Petitioner in the form of a "multi-sounding" depth survey established that the channel's depth at mean high tide ranges from four to five feet in front of the Respondent/Applicant's property (See Exhibit 13) The Petitioner established that access to the Intracoastal Waterway is only feasible through the subject channel running in front of the Respondent/Applicant's property. The Petitioner established that the channel begins with a depth of four feet at low tide or five feet at high tide as its landward boundary which lies fifty-two feet from the Respondent/Applicant's seawall. Thus, a dock extending the proposed sixty feet from the seawall would approach the middle of the subject historic channel and would constitute an impairment to navigation of that channel. In apparent recognition of the question of navigability of this historic channel, which was shown to have a depth of five feet at mean high tide, the Corps of Engineers has issued a permit to the Respondent/Applicant to construct his dock to a point no farther waterward than the four-foot mean low water depth contour of the river. This would allow the dock to extend to the boundary of the channel and would thus allow a dock to be constructed fifty-two feet in a perpendicular direction from the Respondents Applicant's seawall. The parties agree that four feet of water is required for navigability in and around the subject, historic channel. Thus, if the dock extended to the depth of four feet at low tide, which would be five feet at high tide, it would extend into the navigable channel and not allow a sufficiently safe distance waterward of the end of the dock for boats to turn around the end of the dock to negotiate the canal adjacent to the Petitioner's home, especially if Evans' boat is moored at the end of the dock. Accordingly the dock should only extend to that point, denominated on Exhibit 13, which is characterized by a depth at high tide of four feet and which lies six feet landward from the fifty-two-foot extent of dock which the Corps of Engineers' permit would allow. Thus, if the dock were to be built forty-six feet in a perpendicular direction from the seawall an additional six feet would be allowed for the mooring of the Respondent/Applicant's boat off the end of that dock without unduly obstructing navigation in the channel. It is noteworthy in this regard that no witness from the Corps of Engineers, or who was instrumental in the approval of the Corps of Engineers permit, testified at the hearing.

Recommendation In consideration of the foregoing findings of fact and conclusions of law, the evidence in the record, the candor and demeanor of the witnesses and pleadings and arguments of counsel, it is RECOMMENDED: That the Department enter a Final Order granting the requested permit authorizing construction of a private dock and boathouse on the Halifax River in Port Orange, Volusia County, Florida, by Jeffrey David Evans, provided however, that said dock shall not extend a greater distance than forty-six feet in a direction perpendicular to the Respondent/Applicant's seawall on the waterward margin of his property on the Halifax River. DONE AND ENTERED this 29th day of October, 1981, in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of October, 1981. COPIES FURNISHED: Jeffrey C. Sweet, Esquire Post Office Box 5386 Daytona Beach, Florida 32018 Jeffrey David Evans Twelve Venetian Circle Port Orange, Florida 32019 Richard P. Lee, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 120.57
# 5
SYLVAN ZEMEL, AS TRUSTEE; SHIRLEY KAUFMAN, AS TRUSTEE; NATHAN ZEMEL, AS TRUSTEE; ET AL. vs DEPARTMENT OF MANAGEMENT SERVICES, DIVISION OF BUILDING CONSTRUCTION, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 94-005479 (1994)
Division of Administrative Hearings, Florida Filed:Punta Gorda, Florida Oct. 03, 1994 Number: 94-005479 Latest Update: Jun. 28, 1995

Findings Of Fact The Proposed Permit This case involves a 65-acre site in north Lee County owned by the City of Ft. Myers. At all material times, the land has been zoned under industrial- equivalent designations. By leases that are not part of this record, Ft. Myers has leased 21.4 acres of the 65 acres to various governmental agencies, including Lee County, Lee County Sheriff's Office, and possibly the Florida Department of Juvenile Justice (formerly known as Department of Health and Rehabilitative Services). The following facilities are presently located on the 21.4 acres: Juvenile Detention Center, Lee County Stockade, Price Halfway House, Sheriff's Office Aviation Department, and Emergency Operations Center. By lease dated September 20, 1993, Ft. Myers leased the remaining 43.6 undeveloped acres to Lee County for a term of 50 years. This lease allows Lee County to use the 43.6 acres for $1 per year, but only for the operation of a Juvenile Justice Facility. Under Paragraph 20 of the lease, Ft. Myers may terminate the lease if Lee County ceases to operate the facility. Likewise, Lee County may terminate the lease if the Department of Juvenile Justice ceases to fund the County's operation of the facility. Under the lease, preference is given to juvenile residents of Ft. Myers. Paragraph 22 of the lease allocates liability to Lee County for claims or damages arising from released fuels, including from pipelines. The lease is not assignable without Ft. Myer's consent. By agreement dated December 17, 1993, Ft. Myers consented to the sublease of the entire 43.6- acre parcel to the Department of Juvenile Justice for the purpose of the construction of a juvenile residential commitment facility. Lee County receives no rent from the Department of Juvenile Justice. In Paragraph 10 of the agreement, the Department of Juvenile Justice agrees to maintain, at its expense, "all improvements of every kind . . .." Lee County must make any repairs to improvements if the Department of Juvenile Justice fails to do so. By subsequent agreement, Respondent Department of Management Services (DMS) became the agent for the Department of Juvenile Justice for the design, permitting, and construction of the juvenile justice facility. By Application for a surface water management permit executed June 16, 1994, DMS applied for a surface water management permit for the construction and operation of a 10.9- acre project known as the Lee County Juvenile Commitment Facility. This 10.9-acre project is part of the 43.6 acres leased to Lee County and subleased to the Department of Juvenile Justice. The application states that the existing 21.4 acres of developed sites, which are leased under separate agreements to different governmental entities, "will be permitted as is." The Staff Review Summary of Respondent South Florida Water Management District (SFWMD) describes the purpose of the application as follows: This application is a request for Authorization for Construction and Operation of a surface water management system to serve a 10.9 acre Institutional project discharging to Six Mile [Cypress] Slough via onsite wetlands and road- side swales. The application also requests Authorization for Operation of a surface water management system serving a 21.4 acre existing facility and 32.7 acres to remain unchanged for a total permitted area of 65.0 acres. Staff recommends approval of both authorizations with conditions. The Staff Review Summary accurately states that the owner of the land is Ft. Myers. Of questionable accuracy is the statement that Ft. Myers leases to Lee County the 21.4 acres devoted to the five existing facilities. Although Lee County probably is a lessee of some of these parcels, the Lee County Sheriff's Office is the lessee (or perhaps sublessee) of at least two parcels. One of the other parcels may involve a state agency, again under either a lease or a sublease. The Staff Review Summary inaccurately states that the project developer is Lee County. The project developer is DMS or its principal, the Department of Juvenile Justice. The Staff Review Summary reviews the existing development on the 21.4 acres. The improvements consist of the 4.8-acre Juvenile Detention Center, 2.9- acre Price Halfway House, 4.7-acre Lee County Stockade, 5.1-acre Sheriff's Office Aviation Department, and 3.9-acre Emergency Operations Center. The Staff Review Summary states that the footer of the Juvenile Detention Center was inspected in February 1980. The site drains into a 1.2- acre retention pond, which was a natural pond dug out to accept the drainage from the Juvenile Detention Center. A small amount of surface flow drains from the Juvenile Detention Center to a perimeter swale that drains west into a ditch running along Ortiz Avenue. The Staff Review Summary states that the building permit for the Price Halfway House was issued in October 1982. The site drains into the 1.2-acre retention pond, which was apparently enlarged a second time to accept the additional flow. A small amount of the flow from the Price Halfway House also drains to the perimeter swale and west into the Ortiz Avenue ditch. The Staff Review Summary states that the building permit for the Lee County Stockade was issued on May 25, 1976. SFWMD issued an exemption and a determination that no permit was required for two additions to the stockade in 1988 and 1989. For the additional impervious surface added by these additions, one inch of water quality treatment was provided. After the abandonment of a pumping system, drainage of the stockade site consists of water building up in existing onsite ditches and sheet flowing into the Ortiz Avenue ditch. The Staff Review Summary adds that a small retention area constructed at the southeast corner of the site treats stormwater from the stockade and the Sheriff's Office Aviation Department. The summary adds that a small amount of stormwater drains north into an exterior swale that drains into the Ortiz Avenue ditch. The Staff Review Summary states that a building permit was issued for the Sheriff's Office Aviation Department in August 1977. Stormwater from the site sheetflows to exterior swales north and south of the building. When the swales fill up, the water flows into the Ortiz Avenue ditch. The Staff Review Summary states that a building permit was issued for the Emergency Operations Center on October 11, 1977. Drainage from the center flows directly into the Ortiz Avenue ditch. Under "Water Quality," the Staff Review Summary reports that SFWMD "did not require compliance with discharge rate or criteria" based on Section 1.6, Basis of Review for Surface Water Management Permit Applications within the [SFWMD] March 1994 (Basis of Review), which contains guidelines issued by SFWMD for the construction and operation of surface water management systems. The summary adds that there have been no "water quality or quantity complaints associated with this site over the past 18 years since its initial construction." Noting that a surface water management permit is requested for the entire 65-acre parcel, the Staff Review Summary states that the above-described drainage systems for the five existing facilities are "operational and will remain as they now exist." Turning to the proposed development, the Staff Review Summary states that the remaining 43.6 undeveloped acres "will also be leased to Lee County by the City for the proposed commitment facilities." The facilities are accurately described as a 5.2-acre halfway house and a 5.7-acre bootcamp, both of which will be drained by internal drainage swales and culverts flowing into detention areas, which will discharge through a control structure into onsite wetlands leading to the Ortiz Avenue swale. Addressing designed discharge rates, the Staff Review Summary acknowledges that the bootcamp's discharge rate will exceed the allowable rate for a 25-year, three-day storm event. The allowable rate is .33 cfs, and the design rate is .37 cfs. The Staff Review Summary explains that this discrepancy results from the use of the minimum size orifice (three inches) in the control structure. Addressing water quality, the Staff Review Summary reports that commercially zoned sites are required to provide one-half inch dry pretreatment for water quality unless reasonable assurance can be provided that hazardous material will not enter the surface water management system. Determining that no hazardous material will be stored or generated on the site, SFWMD did not require the one-half inch dry pretreatment of runoff. Noting that no surface water management permits have ever been issued for any part of the 65-acre parcel, the Staff Review Summary recommends that, subject to the customary Limiting Conditions, SFWMD issue: Authorization for Construction and Operation of a 10.9 acre Institutional Project discharging to Six Mile Cypress Slough via onsite wetlands and roadside swales, Operation of a 21.4 acre existing facility and 32.7 acres to remain unchanged for a total permitted area of 65.0 acres. Limiting Condition 4 states that the permittee shall request transfer of the permit to the "responsible operational entity accepted by [SFWMD], if different from the permittee." Limiting Condition 8 adds: A permit transfer to the operation phase shall not occur until a responsible entity meeting the requirements in section 9.0, "Basis of Review . . .," has been established to operate and maintain the system. The entity must be provided with sufficient ownership or legal interest so that it has control over all water management facilities authorized herein. Special Condition 11 states: "Operation of the surface water management system shall be the responsibility of Lee County." The Permittee and the Entity Responsible for Maintenance The proposed permit consists of two authorizations. The first authorization is for the construction and operation of the surface water management system on the 10.9-acre parcel on which will be constructed the bootcamp and halfway house. The second authorization is for the operation of the existing surface water management system on the already-developed 21.4 acres and the unimproved surface water management system on the remaining 32.7 acres. There are two problems with the designation of Lee County as the entity responsible for maintaining the permitted surface water management systems. Basis of Review 9.1.B states: To satisfy [P]ermit [L]imiting [C]ondition [8], the Permittee must supply appropriate written proof, such as either by letter or resolution from the governmental entity that the governmental entity will accept the oper- ation and maintenance of all the surface water management system components . . .. The authorization for operation of the systems on the 21.4-acre and 32.7-acre parcels does not await any construction. Once the permit is issued, the authorization is effective. Therefore, all prerequisites to the designation must have been satisfied before the operation permit issues. For the 21.4-acre parcel, DMS has not provided reasonable assurance that Lee County is the lessee or sublessee of all of the parcels underlying the five existing facilities. In fact, it appears that Lee County is not the lessee or sublessee of all of these parcels. Even if Lee County were the lessee or sublessee of these five parcels, DMS has not provided reasonable assurance that Lee County has assumed responsibility for the maintenance of the surface water management system for the five parcels. Contrary to Basis of Review 9.1.B, there is no written agreement by Lee County to assume operational responsibility, nor is there even an actual agreement to this effect. SFWMD's rules sensibly require that written consent be obtained before the operation permit is issued. Likewise, DMS has failed to show that Lee County has agreed to assume responsibility for the operation and maintenance of the surface water management system for the 32.7-acre parcel. Again, SFWMD must obtain written consent before issuing the permit because no construction will precede operation for the surface water management system on this parcel. Unlike the situation as to the 21.4-acre parcel, the 32.7-acre parcel is leased to Lee County as part of the 43.6- acre parcel. But in the December 17, 1993, agreement, the Department of Juvenile Justice, not Lee County, assumes responsibility for maintaining all improvements, which arguably includes drainage improvements. As between Ft. Myers and Lee County, Lee County assumes secondary liability for the maintenance of all improvements. But the failure of the Department of Juvenile Justice to do so would likely represent a default under the agreement. In such a case, the lease and separate agreement probably would either be in litigation or Lee County would have terminated its obligations under the contracts. In either case, it is unlikely that Lee County would perform its secondary responsibility to maintain the drainage improvements, especially where it is receiving no rent from the Department of Juvenile Justice and priority is given to Ft. Myers juveniles in admission decisions. Construction will precede operation as to the 10.9- acre parcel so the parties have an opportunity, even after the construction and operation permit is issued, to secure the necessary written consent before the operation permit goes into effect. But similar deficiencies exist with respect to the 10.9- acre parcel because the same agreement imposes upon the Department of Juvenile Justice, not Lee County, the obligation to maintain improvements. An additional complication arises as to the 10.9-acre parcel. The Department of Juvenile Justice intends to contract with one or more private entities to operate the bootcamp and halfway house, so there is at least one more party that Lee County could claim was responsible for maintenance of the surface water management system. The question of who is responsible for maintaining the surface water management systems is important. Drainage quantities and directions can change if swales clog up with vegetation or other matter. In this case, one roadside swale in the area of the 21.4-acre parcel is blocked with vegetation. DMS and SFWMD have thus failed to provide reasonable assurance that the designated entity has assumed responsibility for the maintenance and operation of the existing systems or will assume responsibility for the maintenance and operation of the proposed system following its construction. Permit for Existing Development Section 1.6, Basis of Review, states: [SFWMD] issues construction and operation permits for proposed surface water management activities and operation permits for existing systems. The criteria herein are specifically designed to apply to proposed activities (construction and operation permits). Therefore, some of the criteria may not be applicable to the permitting of existing systems (operation permits). For example, in some cases, existing systems may not meet flood protection criteria. Criteria deviation for existing systems will be identified in staff reports. SFWMD has produced no evidence explicating the extent to which existing systems, such as the systems on the 21.4- and 32.7-acre parcels, are entitled to operating permits without meeting some of the criteria applicable to proposed systems, such as the system on the 10.9-acre parcel. There is nothing whatsoever in the record to explain why certain existing systems might not have to meet certain criteria, such as flood protection criteria. Except for the quantity deviation discussed below, there is nothing in the record disclosing the extent to which SFWMD has waived, or even considered the applicability of, certain or all criteria prior to the issuance of operation permits for the existing systems. In practice, SFWMD does not adhere even to the vague standards implied in 1.6. According to the SFWMD witness, the practice of SFWMD, as reflected in this case as to the systems on the 21.4- and 32.7-acre parcels, is to permit existing systems "as is, where is," as long as they have had no reported problems. There are numerous deficiencies in the "as is, where is" unwritten policy, apart from the obvious one that it conflicts with the assurance of 1.6 that only "some of the criteria may not be applicable" to existing systems. First, the record does not define what a "problem" is. Second, the record discloses no means by which reported problems are collected and later accessed, such as by a parcel index. The "as is, where is" policy is an abdication of the limited responsibilities that SFWMD imposes upon itself in 1.6, especially when applied to the present facts. The facts are straightforward. Neither Ft. Myers, Lee County, nor any other party has ever obtained a permit for any surface water management system, despite numerous improvements in the past 20 years requiring such permits, including the construction of a heliport, at which maintenance and refueling of helicopters takes place. In two relatively minor cases, discussed below, SFWMD erroneously determined that no permit was required. In one of those cases, the applicant, Lee County, candidly admitted the existence of a flooding problem. Based on the present record, neither DMS nor SFWMD has justified the issuance of an operation permit for the systems on the 21.4- and 32.7-acre parcels based either on Basis of Review 1.6 or on the "as is, where is" unwritten policy. Construction of the five improvements on the 21.4 acres began between 1975 and December 1977 with construction of a portion of the Lee County Stockade building and parking, Emergency Operations Center building and parking, and a now- removed barn for the Lee County Sheriff's Office. At the same time, a lake was dug, probably for fill purposes. By the end of 1977, about 2.39 acres of the 21.4 acres were converted to impervious surface. From 1978 to March 1980, another 0.96 acres of the 21.4 acres were converted to impervious surface by the construction of a perimeter dike and road. During this period, construction commenced on the Juvenile Detention Center, adding another 1.63 acres of impervious surface. Between March 1980 and December 1981, additions were made to the Lee County Stockade building and the lake for an additional 0.45 acres of impervious area. Between December 1981 and March 1984, the Price Halfway House building and parking were constructed, adding another 0.79 acres of impervious surface. Between March 1984 and February 1986, a heliport facility and landing area were constructed for the Lee County Sheriff's Office, adding another 1.01 acres of impervious surface. Between February 1986 and February 1990, an additional 2.31 acres of impervious surface were added through additions to the Lee County Stockade and parking area, juvenile detention center, and Emergency Operations Center parking area. Between February 1990 and April 1993, another addition to the Lee County Stockade added 0.62 acres of impervious surface. An additional 0.17 acres of lake was excavated. During this time, applicable rules and statutes required permits for the construction of "works" affecting surface water, including ditches, culverts, and other construction that connects to, or draws water from, drains water into, or is placed in or across the waters in the state. The buildings, parking, other impervious surfaces, ditches, swales, dikes, lake excavations, and, at one point, addition of a now- abandoned pump all constituted "works" for which surface water management permits were required. In 1988, Lee County or Ft. Myers applied for an exemption for an addition to the Lee County Stockade. The basis for the claim of exemption was that the parcel consisted of less than 10 acres and the total impervious surface did not exceed two acres. Although rules in effect at the time required consideration of the contiguous 65 acres under common ownership and the total impervious surface for the 9.7-acre "parcel" exceeded two acres, SFWMD erroneously issued an exemption letter. The second instance involving a claim of exemption took place in 1989 when Lee County submitted plans for another addition to the Lee County Stockade, adding 0.51 acres of impervious surface. The submittal acknowledged a "flooding" problem, but promised a master drainage plan for the "entire site." SFWMD determined that no permit would be required due to the promise of a master drainage plan. No master drainage plan was ever prepared. The flooding problem precluded issuance of the operation permit on an "as is, where is" basis for the already-developed 21.4-acre parcel, even assuming that SFWMD adequately justified the use of this unwritten permitting procedure. In fact, SFWMD has not explained adequately its "as is, where is" permitting procedure or even the undelineated permitting criteria referenced in 1.6, Basis of Review. The 65- acre parcel is a poor candidate for preferential permitting of existing systems. The owner and developer constructed the existing systems in near total disregard of the law. The two times that the owner and developer complied with the permitting process involved small additions for which exemptions should not have been granted. In one case, SFWMD exempted the proposed activity due to its error calculating minimum thresholds as to the areas of the parcel and the impervious surface. In the other case, SFWMD exempted the proposed activity partly in reliance on a promised master drainage plan that was not later prepared. To issue operation permits for the existing systems on the 21.4- and 32.7-acre parcels would reward the owner and developer of the 65-acre parcel for noncompliance with the law and provide an incentive for similarly situated landowners and developers likewise to ignore the law. Before issuing operation permits on systems that have received no comprehensive review and that have been added piecemeal over the years, SFWMD must evaluate the surface water systems on the entire 65-acre parcel to determine whether they meet all applicable criteria. The "as is, where is" unwritten policy has no applicability where there have been reports of flooding. If SFWMD chooses to dispense with criteria in reliance upon Basis of Review 1.6, it must be prepared to identify and explain which criteria are waived and why. Water Quality Basis of Review 5.2.2 provides that projects that are zoned commercial or industrial, such as the present one, must provide one-half inch of "dry" detention or retention pretreatment, unless reasonable assurances are provided "that hazardous materials will not enter the project's surface water management system." There is no existing or proposed dry detention on the 65 acres. The existing development includes the Sheriff's Office Aviation Department, which serves as a heliport. The fueling and maintenance of helicopters means that contaminants may enter the stormwater draining off the site. The functioning of the surface water system on this site is therefore of particular importance. There also may be more reason to question the functioning of the surface water system on this site. It is south of the Lee County Stockade, where flooding has been reported. The heliport site has also been the subject of more elaborate drainage improvements, such as the location of a small retention pond near the Stockade boundary and a pump, the latter of which has since been abandoned. The existing system on the 21.4-acre parcel, as well as the existing and proposed systems on the remainder of the 65 acres, require dry pretreatment for reasons apart from the presence of the heliport. The materials likely to be used with the existing and proposed developments are similar to those found on residential sites. SFWMD and DMS contend that there is therefore no need to require dry pretreatment as to these areas. However, the existing and intended institutional uses, such as jails and bootcamps, represent an intensity of use that exceeds the use typical in areas zoned residential. This increased intensity implies the presence of typical residential contaminants, such as petroleum-based products or cleaning solvents, but in greater volumes or concentrations, if not also, in the case of solvents, different compositions. The lease addresses potential liability for released petroleum. In the absence of a showing that such hazardous materials are prevented from entering the runoff, SFWMD must require dry pretreatment for the systems occupying the entire 65-acre parcel. DMS and SFWMD have thus failed to provide reasonable assurance that the existing systems satisfy applicable water quality criteria or that the proposed system will satisfy applicable water quality criteria. Water Quantity The 65-acre parcel adjoins Ortiz Avenue on the west and property owned by Petitioners on the east and south that is undeveloped except for a borrow pit some distance from the 65- acre parcel. The parcel is roughly 1000 feet east- west and 2700 feet north-south. The proposed halfway house is at the north end of the parcel. The halfway house is situated between a proposed detention pond on the west and a recreation field on the east. A paved road divides the halfway house from the rest of the 65- acre parcel. South of the road are the Lee County Stockade on the west, which abuts Ortiz Avenue, and the Juvenile Detention Center on the east. A berm separates these two sites. The berm runs from the road along the west shore of the twice- enlarged 1.2- acre retention pond and the west boundary of the Price Halfway House, which is south of the Juvenile Detention Center. To the west of the berm, south of the Lee County Stockade, is the Sheriff's Office Aviation Department or heliport facility, which abuts Ortiz Avenue. South of the Aviation Department is an outparcel used by the Florida Department of Corrections that also abuts Ortiz Avenue. East of the outparcel is the proposed halfway house with a proposed detention pond west of the halfway house and south of the outparcel. The Emergency Operations Center, which abuts Ortiz Avenue, is south of the detention pond and surrounded on three sides by the 32.7 acres to be left undisturbed at this time. There are perimeter berms around all of the parcels except for the Juvenile Detention Center and Price Halfway House, which are served by a single berm, and the Emergency Operations Center, which appears not to be bermed. The prevailing natural drainage is not pronounced either by direction or volume because the land is nearly level. The natural direction of drainage is to the south and west and remains so on Petitioners' land to the east and south and the undisturbed 32.7 acres to the south. The variety of drainage directions within the remainder of the 65- acre parcel reflects the extent to which berms, swales, ponds, pumps, roads, buildings, parking areas, and other works have been added to the northerly parcels. Runoff reaching the northern boundary of the 65 acres will be diverted due west around the proposed detention pond to the swale running along the east side of Ortiz Avenue. Runoff from the recreation field and halfway house building and parking area drain into the proposed detention pond, which releases water through a gravity control device to the Ortiz Avenue swale. There appears to be a connection routing some runoff from the south side of the recreation field to the Juvenile Detention Center, where it travels west in a roadside swale to the Ortiz Avenue swale. A little less than half of the area of the Juvenile Detention Center site drains into perimeter swales along the north and east borders and then to the west before emptying into the Ortiz Avenue swale. The remainder of the Juvenile Detention Center drains into the retention pond. The same is true of the Price Halfway House. The Lee County Stockade drains to each of its borders where the water then runs west along the north or south border to the Ortiz Avenue swale. The southern half of the Lee County Stockade site drains into the small retention pond at the northwest corner of the Sheriff's Office Aviation Department. Most of the runoff from the heliport facility runs to the southwest corner of the parcel, which is the location of the abandoned pump. From there, the runoff continues to the Ortiz Avenue swale. Very little if any of the runoff from the heliport enters the small retention pond on the northwest corner of the parcel. The bootcamp drains into the detention pond, which then releases water by a gravity control structure into a portion of the undisturbed 32.7-acres before entering the Ortiz Avenue swale. The Emergency Operations Center site drains in all directions away from the building and parking area, eventually draining into the Ortiz Avenue swale. Stormwater discharge rates from the proposed halfway house and bootcamp are 0.28 cfs and 0.37 cfs. Under SFWMD rules, the allowable maximums in the Six Mile Cypress drainage basin are 0.30 cfs and 0.33 cfs, respectively. SFWMD and DMS contend that the excessive discharge from the bootcamp is acceptable because the gravity control device for the proposed detention pond is of the smallest size allowable, given the indisputable need to avoid clogging and ensuing upstream flooding. Initially, SFWMD approved the discharge rates for the halfway house and bootcamp because, when combined, they did not exceed the total allowable value. However, this approach was invalid for two reasons. First, the two sites contain entirely independent drainage systems separated by several hundred feet. Second, after correcting an initial understatement for the value for the halfway house, the actual total exceeds the maximum allowable total. SFWMD contends that the slight excess is acceptable because of the inability to use a smaller orifice in the gravity control structure. However, the discharge quantity easily could have been reduced by design alternatives, such as enlarging the detention pond, which is mostly surrounded by land that is to be left undisturbed. The ease with which the minimum-orifice problem could have been avoided rebuts the presumption contained in Basis of Review 7.2.A that excessive discharge quantities are presumably acceptable if due to the inability to use a smaller orifice. Also, SFWMD and DMS have failed to show that the effect of the excessive discharge quantities is negligible, so the exception in the SFWMD manual for negligible impacts is unavailable. Neither SFWMD nor DMS provided any reasonable assurance as to the quantity of discharge from the 21.4 acres. Rough estimates suggest it is more likely that the quantity of discharge may greatly exceed the allowable maximum. SFWMD must evaluate the water-quantity issues before issuing operation permits for the systems on the 21.4- and 32.7- acre parcels and a construction and operation permit for the 10.9-acre parcel. Obviously, if SFWMD determines that all water quantity criteria are met as to the existing systems, it may issue operation permits for the systems on the 21.4- and 32.7- acre parcels. Otherwise, SFWMD must quantify the extent of the deviation and, if it seeks to waive compliance with any or all quantity standards in reliance on Basis of Review 1.6, evaluate the effect of the waiver and explain the basis for the waiver. DMS and SFWMD have thus failed to provide reasonable assurance that the existing systems satisfy applicable water quantity criteria or that the proposed system will satisfy applicable water quantity criteria. Impacts on Adjacent Lands Petitioners' property is impacted by the above- described drainage in two ways. First, Petitioners' property abutting the east side of Ortiz Avenue, south of the 65 acres, is especially vulnerable to flooding because the Ortiz Avenue swale is not a V-notch, but a half-V. The closed side of the swale prevents the water from running onto Ortiz Avenue. The open side of swale abuts Petitioners' property, so, if the swale's capacity is exceeded, stormwater will be released onto Petitioners' land. Second, perimeter berming along the east side of the 10.9- and 21.4- acre parcels will impede flow off the part of Petitioners' property located to the east of the 65 acres. A swale between the proposed halfway house and the Juvenile Detention Center will receive runoff from a small portion of Petitioners' property to the east and mostly north of the 65 acres. But there is no indication how much runoff from Petitioners' property can be so accommodated, how much runoff is impeded by the existing berm along the east side of the Juvenile Detention Center and Price Halfway House, and how much runoff will be impeded by the addition of new berms along the east side of the proposed halfway house and bootcamp. Basis of Review 6.8 requires that swales and dikes allow the passage of drainage from off-site areas to downstream areas. Rule 40E-4.301(1)(b), Florida Administrative Code, requires that an applicant provide reasonable assurances that a surface water management system will not cause adverse water quality or quantity impacts on adjacent lands. Neither SFWMD nor DMS obtained topographical information for Petitioners' property, as required by the Basis of Review. Rough estimates suggest that the proposed project may require Petitioners' property to retain considerably more stormwater from the design storm event of 25 years, three days. DMS and SFWMD have thus failed to provide reasonable assurance that the proposed system would not have an adverse impact on Petitioners' upstream and downstream land.

Recommendation It is hereby RECOMMENDED that the South Florida Water Management District enter a final order denying the application of the Department of Management Services for all permits for the operation and construction and operation of surface water management systems on the 65-acre parcel. ENTERED on June 19, 1995, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on June 19, 1995. APPENDIX Rulings on Proposed Findings of Petitioners 1-18: adopted or adopted in substance. 19: rejected as subordinate. 20-21: adopted or adopted in substance. 22-24 (first sentence): rejected as irrelevant. 24 (remainder)-46: adopted or adopted in substance. 47-53: rejected as subordinate. 54-64 (first sentence): adopted or adopted in substance. 64 (second sentence)-66: rejected as subordinate. Rulings on Proposed Findings of Respondent SFWMD 1-10: adopted or adopted in substance. 11: rejected as unsupported by the appropriate weight of the evidence. 12: rejected as unnecessary. 13: adopted or adopted in substance. 14-15: rejected as subordinate. 16: rejected as unsupported by the appropriate weight of the evidence. 17 (except for last sentence): adopted or adopted in substance. 17 (last sentence): rejected as unsupported by the appropriate weight of the evidence. 18-32 (first sentence): rejected as unnecessary. 32 (remainder): rejected as unsupported by the appropriate weight of the evidence. 33: rejected as subordinate. 34: rejected as unsupported by the appropriate weight of the evidence, except that the proposed ponds are wet detention. 35 (first sentence): adopted or adopted in substance. 35 (remainder): rejected as unsupported by the appropriate weight of the evidence. 36-45: rejected as unnecessary. 46-47: rejected as unsupported by the appropriate weight of the evidence. 48-50 (second sentence): adopted or adopted in substance. 50 (remainder): rejected as unsupported by the appropriate weight of the evidence. 51-52, 55-57 (first sentence), and 58: adopted or adopted in substance, although insufficient water quality treatment. 53: adopted or adopted in substance. 54: rejected as unsupported by the appropriate weight of the evidence. 57 (second sentence): rejected as unsupported by the appropriate weight of the evidence. 59: rejected as unsupported by the appropriate weight of the evidence. 60: adopted or adopted in substance, except after "therefore." None of remainder logically follows from what is said in 1.6. 61: rejected as unsupported by the appropriate weight of the evidence. 62-64: rejected as subordinate, unsupported by the appropriate weight of the evidence, and irrelevant. 65: rejected as subordinate. 66: rejected as irrelevant. The burden is on the applicant and SFWMD, if it wishes to issue the permits, to provide reasonable assurances as to the adverse impact of the drainage systems. 67-68: rejected as subordinate. 69: rejected as unsupported by the appropriate weight of the evidence. 70: rejected as unsupported by the appropriate weight of the evidence. 71: rejected as repetitious. 72: rejected as irrelevant, except for past report of flooding, which is rejected as repetitious. 73: rejected as repetitious. 74: rejected as irrelevant and subordinate. 75 (first three sentences): adopted or adopted in substance. 75 (remainder): rejected as unsupported by the appropriate weight of the evidence. 1 and 2: rejected as irrelevant insofar as the same result is reached with or without the permit modifications. Rulings on Proposed Findings of Respondent DMS 1-4: adopted or adopted in substance. 5: rejected as subordinate. 6: rejected as unsupported by the appropriate weight of the evidence. 7: adopted or adopted in substance. 8: rejected as subordinate. 9: adopted or adopted in substance, except that the excessive discharge was not "caused" by the minimum-sized orifice, only defended on that basis. 10: adopted or adopted in substance. 11-12: rejected as subordinate. 13: rejected as irrelevant. 14: adopted or adopted in substance. 15: adopted or adopted in substance, except for implication that no flooding problems existed. 16: rejected as recitation of evidence. 17: rejected as subordinate. 18: rejected as irrelevant. 19: adopted or adopted in substance, to the extent that separateness of systems is relevant. 20: rejected as subordinate. 21: adopted or adopted in substance, except for last sentence, which is rejected as unsupported by the appropriate weight of the evidence. 22: rejected as subordinate. 23-30: rejected as unsupported by the appropriate weight of the evidence, recitation of evidence, and subordinate. 31: rejected as unsupported by the appropriate weight of the evidence. 32: rejected as unsupported by the appropriate weight of the evidence, based on the present record. 33: rejected as unsupported by the appropriate weight of the evidence and relevance. COPIES FURNISHED: Tilford C. Creel Executive Director South Florida Water Management District P. O. Box 24680 West Palm Beach, FL 33416 Russell P. Schropp Harold N. Hume, Jr. Henderson Franklin P.O. Box 280 Ft. Myers, Fl 33902 O. Earl Black, Jr. Stephen S. Mathues Department of Management Services 4050 Esplanade Way, Suite 260 Tallahassee, FL 32399-0950 Vincent J. Chen Toni M. Leidy South Florida Water Management District 3301 Gun Club Road West Palm Beach, FL 33401

Florida Laws (3) 1.01120.57373.413 Florida Administrative Code (2) 40E-4.09140E-4.301
# 6
J. C. BASS; BASS RANCH, INC.; AND OKEECHOBEE COUNTY vs. COQUINTA WATER MANAGEMENT DISTRICT AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 78-000181 (1978)
Division of Administrative Hearings, Florida Number: 78-000181 Latest Update: Nov. 14, 1978

Findings Of Fact On September 13, 1977, SFWMD advised Coquina by letter that "[a]t its September 8, 1977 meeting the Governing Board of this District gave Conceptual Approval of [Coquina's] surface water management plan . . . subject to the four special conditions found on page 15 of the District's staff report. . . [and an] additional special condition Joint exhibit No. 5. The first special condition found on page 15 of the District's staff report requires that complete construction plans be submitted, including "supporting calculations for all design elements not already submitted and any other plans necessary to assure adherence to the concept plan." Joint exhibit No. 2, page 15. The plan approved by SFWMD is designed to lower the water table in a 22 square mile area northwest of Lake Okeechobee in Okeechobee County. In its natural state, the land lies under water for part of the year. The corporate owner of the land has plans to subdivide it and sell residential lots, beginning with the four contiguous sections as to which the present application for a construction permit has been made. These four sections (phase I) lie north and south of each other in the western portion of the larger tract. The proposed construction would consist of digging ditches or swales paralleling existing and planned roads; building intersecting collector swales running north and south; installing ditch checks where swales intersect; dredging a retention pond into which the collector swales could empty at the south end of the phase I tract; digging an outfill ditch to channel water leaving the retention area for Ash Slough; and erecting a weir, between the retention area and the slough. Culverts through the weir would be equipped "with standard flash board risers in which the water level is regulated by stop logs which can be added or removed," Coquina's exhibit No. 1, p. 10, and the culverts would ordinarily serve as the route by which water from the retention area would reach Ash Slough. Under extremely wet conditions, however, water from the retention area could overflow the weir. The intervening petitioners own land on Ash Slough downstream from the retention area and adjacent to the southern boundary of the phase I tract. No formal studies of the likely effects of the proposed construction downstream were undertaken by Coquina or by SFWMD in evaluating Coquina's application. The surface water management plan given conceptual approval by SFWMD provides: The quantity of runoff flowing to the south through existing sloughs will be controlled to protect the downstream areas against flooding whereas at the present there is no control. The amount flowing to the existing sloughs to the south during the 25 yr. design storm will be limited to the amount flowing to those sloughs before any development takes place. Lesser storms will be more completely retained on the property. Controlled discharge will be provided from retention areas to the existing sloughs for the purpose of nourishing these streams. Coquina's exhibit No. 1, p. 1. (Emphasis supplied) Since no records of the amount of discharge to Ash Slough "before any development" are in existence, certain assumptions and estimates were made. One such assumption on which the application for construction permit proceeds is that the phase I tract all drains to the south, in its present state. In fact, some of the water now leaving the phase I tract travels in a westerly direction and never enters Ash Slough, at least under some weather conditions. If the proposed construction is accomplished, the phase I tract would all drain to the south through Ash Slough. As things now stand, a significant amount of water leaves the phase I tract by evapotranspiration. If the water table were lowered two and a half feet, which is what Coquina proposes, less water would leave the phase I tract by evapotranspiration, leaving more water to flow over the ground. In estimating the quantity of the anticipated discharge to Ash Slough, if the proposed construction takes place, it is necessary to take into account drainage onto the phase I tract from adjoining lands. Coquina has failed to furnish plans and supporting calculations sufficient to insure that the proposed construction will not increase the amount of flow to Ash Slough during the 25 year design storm. Increased flow to Ash Slough would aggravate downstream landowners' drainage problems, unless the slough could handle the additional flow, a question which the application does not address. The foregoing findings of fact should be read in conjunction with the statement required by Stuckey's of Eastman, Georgia v. Department of Transportation, 34O So.2d 119 (Fla. 1st DCA 1976), which is attached as an appendix to the recommended order.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That SFWMD deny Coquina's application for construction permit. DONE and ENTERED this 14th day of November, 1978, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 APPENDIX Paragraph one of intervening Bass petitioners' proposed findings of fact has been adopted, in substance, insofar as relevant, except that the evidence did not demonstrate that downstream landowners would in fact be harmed. Paragraphs two, three, four, five, six and seven of intervening Bass petitioners' proposed findings of fact have been adopted, in substance, insofar as relevant. Paragraph one of respondent Coquina's proposed findings of fact has been adopted, in substance, insofar as relevant, except for the date of the application. Paragraphs two, three, four, five, six, seven, eight, nine and thirteen of respondent Coquina's proposed findings of fact have been adopted in substance, insofar as relevant. Paragraph ten of respondent Coquina's proposed findings of fact stated a conclusion of law, in part. While "testimony was presented that the construction of Phase I would have no substantial adverse affect [sic] on surrounding properties," the evidence as a whole did not establish this fact. Paragraphs eleven and twelve of respondent Coquina's proposed findings of fact have not been adopted because they were not established by the evidence, except for subparagraph eleven (f), which was proven. COPIES FURNISHED: John Henry Wheeler, Esquire South Florida Water Management District Post Office Box V West Palm Beach, Florida 33402 Robert Birenbaum, President Viking Communities Corporation (Coquina Water Management District) 123 Northeast 70 Street Miami, Florida 33138 Kyle S. Van Landingham, Esquire County Attorney Okeechobee County Courthouse Okeechobee, Florida 33472 Andrew B. Jackson, Esquire J.C. Bass & Bass Ranch, Inc. Post Office Box 488 Lake Placid, Florida 33852 Emerson Allsworth, Esquire 1177 Southeast Third Avenue Ft. Lauderdale, Florida 33316 Mr. Bob Wittenberg Division of Florida Land Sales and Condominiums The Johns Building 725 South Bronough Street Tallahassee, Florida 32304 Dr. Patrick M. McCaffrey Kissimmee Coordinating Council 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. George Stansbury Central Florida Regional Planning Council Post Office Box 2089 Bartow, Florida 33830

# 7
LANIGER ENTERPRISES OF AMERICA, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 06-001245EF (2006)
Division of Administrative Hearings, Florida Filed:Stuart, Florida Apr. 12, 2006 Number: 06-001245EF Latest Update: Sep. 19, 2006

The Issue The issue in this case is whether Respondent Laniger Enterprises of America, Inc. (Laniger), is liable to Petitioner Department of Environmental Protection (Department) for penalties and costs for the violations alleged in the Department's Notice of Violation, Orders for Corrective Action, and Administrative Penalty Assessment (NOV).

Findings Of Fact The Parties The Department is the administrative agency of the State of Florida having the power and duty to protect Florida's air and water resources and to administer and enforce the provisions of Chapter 403, Florida Statutes, and the rules promulgated in Florida Administrative Code Title 62. Laniger is a Florida corporation that owns and operates the WWTP that is the subject of this case, located at 1662 Northeast Dixie Highway, Jensen Beach, Martin County, Florida. The WWTP is referred to in the Department permit documents as the Beacon 21 WWTP. The WWTP Laniger acquired the WWTP in 1988 in a foreclosure action. At that time, the WWTP was in a "dilapidated" condition and was operating under a consent order with the Department. After acquiring the WWTP, Laniger brought it into compliance with the Department's requirements. Laniger's WWTP is commonly referred to as a "package plant."3 The WWTP's treatment processes are extended aeration, chlorination, and effluent disposal to percolation ponds. The WWTP does not have a direct discharge to surface water. It was permitted to treat 99,000 gallons per day (gpd) of wastewater. Its average daily flow during the past year was about 56,000 gallons. The east side of the WWTP site is adjacent to Warner Creek. On the north side of the WWTP site, an earthen berm separates the WWTP's percolation ponds from a drainage ditch that connects to Warner Creek. Warner Creek is a tributary to the St. Lucie River. The St. Lucie River is part of the Indian River Lagoon System. The Indian River Lagoon Act In 1989, the St. Johns River Water Management District and the South Florida Water Management District jointly produced a Surface Water Improvement and Management (SWIM) Plan for the Indian River Lagoon System ("the lagoon system"). For the purpose of the planning effort, the lagoon system was defined as composed of Mosquito Lagoon, Indian River Lagoon, and Banana River Lagoon. It extends from Ponce de Leon Inlet in Volusia County to Jupiter Inlet in Palm Beach County, a distance of 155 miles. The SWIM Plan identified high levels of nutrients as a major problem affecting the water quality of the lagoon system. Domestic wastewater was identified as the major source of the nutrients. The SWIM Plan designated 12 problem areas within the lagoon system and targeted these areas for "research, restoration and conservation projects under the SWIM programs." Department Exhibit 2 at 11-13. Neither Warner Creek nor the St. Lucie River area near Laniger's WWTP is within any of the 12 problem areas identified in the SWIM Plan. With regard to package plants, the SWIM Plan stated: There are numerous, privately operated, "package" domestic WWTPs which discharge indirectly or directly to the lagoon. These facilities are a continual threat to water quality because of intermittent treatment process failure, seepage to the lagoon from effluent containment areas, or overflow to the lagoon during storm events. Additionally, because of the large number of "package" plants and the lack of enforcement staff, these facilities are not inspected or monitored as regularly as they should be. Where possible, such plants should be phased out and replaced with centralized sewage collection and treatment facilities. Department Exhibit 2, at 64. In 1990, the Legislature passed the Indian River Lagoon Act, Chapter 90-262, Laws of Florida. Section 1 of the Act defined the Indian River Lagoon System as including the same water bodies as described in the SWIM Plan, and their tributaries. Section 4 of the Act provided: Before July 1, 1991, the Department of Environmental Regulation shall identify areas served by package sewage treatment plants which are considered a threat to the water quality of the Indian River Lagoon System. In response to this legislative directive, the Department issued a report in July 1991, entitled "Indian River Lagoon System: Water Quality Threats from Package Wastewater Treatment Plants." The 1991 report found 322 package plants operating within the lagoon system and identified 155 plants as threats to water quality. The 1991 report described the criteria the Department used to determine which package plants were threats: Facilities that have direct discharges to the system were considered threats. Facilities with percolation ponds, absorption fields, or other sub-surface disposal; systems located within 100 feet of the shoreline or within 100 feet of any canal or drainage ditch that discharges or may discharge to the lagoon system during wet periods were considered threats. * * * Facilities with percolation ponds, absorption fields, or other sub-surface disposal systems located more than 100 feet from surface water bodies in the system were evaluated case-by-case based on [operating history, inspection reports, level of treatment, and facility reliability]. Laniger's package plant was listed in the 1991 report as a threat to the water quality of the lagoon system because it was within 100 feet of Warner Creek and the drainage ditch that connects to Warner Creek. The Department notified Laniger that its WWTP was listed as a threat to the water quality of the lagoon system soon after the 1991 report was issued. The Department's 1991 report concluded that the solution for package plants threats was to replace them with centralized sewage collection and treatment facilities. To date, over 90 of the package plants identified in the Department's 1991 report as threats to the water quality of the lagoon system have been connected to centralized sewage collection and treatment systems. The 1999 Permit and Administrative Order On August 26, 1999, the Department issued Domestic Wastewater Facility Permit No. FLA013879 to Laniger for the operation of its WWTP. Attached to and incorporated into Laniger's 1999 permit was Administrative Order No. AO 99-008- DW43SED. The administrative order indicates it was issued pursuant to Section 403.088(2)(f), Florida Statutes. That statute pertains to discharges that "will not meet permit conditions or applicable statutes and rules" and requires that the permit for such a discharge be accompanied by an order establishing a schedule for achieving compliance. The administrative order contains a finding that the Beacon 21 WWTP is a threat to the water quality of the lagoon system and that the WWTP "has not provided reasonable assurance . . . that operation of the facility will not cause pollution in contravention of chapter 403, F.S., and Chapter [sic] 62-610.850 of the Florida Administrative Code." The cited rule provides that "land application projects shall not cause or contribute to violations of water quality standards in surface waters." Most of the parties' evidence and argument was directed to the following requirements of the administrative order: Beacon 21 WWTP shall connect to the centralized wastewater collection and treatment within 150 days of its availability and properly abandoned facility [sic] or provide reasonable assurance in accordance with Chapter 62-620.320(1) of the Florida Administrative Code that continued operation of the wastewater facility is not a threat to the water quality of the Indian River Lagoon System and will not cause pollution in contravention of chapter 403, F.S. and Chapter 62-610.850 of the Florida Administrative Code. * * * (3) Beacon 21 WWTP shall provide this office with semi annual reports outlining progress toward compliance with the time frames specified in paragraph 1 of this section, beginning on the issuance date of permit number FLA013879-002-DW3P. The administrative order contained a "Notice of Rights" which informed Laniger of the procedures that had to be followed to challenge the administrative order. Laniger did not challenge the administrative order. As a result of an unrelated enforcement action taken by the Department against Martin County, and in lieu of a monetary penalty, Martin County agreed to extend a force main from its centralized sewage collection and treatment facility so that the Laniger WWTP could be connected. The extension of the force main was completed in April 2003. The force main was not extended to the boundary of the Laniger WWTP site. The force main terminates approximately 150 feet north of the Laniger WWTP site and is separated from the WWTP site by a railroad. Correspondence Regarding Compliance Issues On August 21, 2001, following an inspection of the Laniger WWTP, the Department sent Laniger a letter that identified some deficiencies, one of which was Laniger's failure to submit the semi-annual progress reports required by the administrative order. Reginald Burge, president of Laniger and owner of the WWTP, responded by letter to William Thiel of the Department, stating that, "All reports were sent to the West Palm Beach office. Copies are attached." Mr. Thiel testified that the progress reports were not attached to Laniger's letter and he informed Laniger that the reports were not attached. Mr. Burge testified that he subsequently hand-delivered the reports. At the hearing, it was disclosed that Laniger believed its semi-annual groundwater monitoring reports satisfied the requirement for progress reports and it was the monitoring reports that Mr. Burge was referring to in his correspondence and which he hand-delivered to the Department. Laniger's position in this regard, however, was not made clear in its correspondence to the Department and the Department apparently never understood Laniger's position until after issuance of the NOV. On April 10, 2003, the Department notified Laniger by letter that a centralized wastewater collection and treatment system "is now available for the connection of Beacon 21." In the notification letter, the Department reminded Laniger of the requirement of the administrative order to connect within 150 days of availability. On May 9, 2003, the Department received a response from Laniger's attorney, stating that the administrative order allowed Laniger, as an alternative to connecting to the centralized wastewater collection and treatment system, to provide reasonable assurance that the WWTP was not a threat to the water quality of the lagoon system, and Laniger had provided such reasonable assurance. It was also stated in the letter from Laniger's attorney that "due to the location of Martin County's wastewater facilities, such facilities are not available as that term is defined in the [administrative] Order."4 On May 29, 2003, the Department replied, pointing out that the administrative order had found that reasonable assurance was not provided at the time of the issuance of the permit in 1999, and Laniger had made no "improvements or upgrades to the facility." The Department also reiterated that the progress reports had not been submitted. On September 29, 2003, the Department issued a formal Warning Letter to Laniger for failure to connect to the Martin County force main and for not providing reasonable assurance that the WWTP will not cause pollution in contravention of Chapter 403, Florida Statutes. The progress reports were not mentioned in the Warning Letter. The Department took no further formal action until it issued the NOV in August 2005. Count I: Failure to Timely File for Permit Renewal and Operating Without a Permit Count I of the NOV alleges that Laniger failed to submit its permit renewal application at least 180 days prior to the expiration of the 1999 permit, failed to obtain renewal of its permit, and is operating the WWTP without a valid permit. The date that was 180 days before the expiration of the 1999 permit was on or about February 27, 2004. Laniger did not submit its permit renewal application until February 15, 2005. In an "enforcement meeting" between Laniger and the Department following the issuance of the warning letter in September 2003, the Department told Laniger that it would not renew Laniger's WWTP permit. It was not established in the record whether this enforcement meeting took place before or after February 27, 2004. When Laniger filed its permit renewal application in February 2005, the Department offered to send the application back so Laniger would not "waste" the filing fee, because the Department knew it was not going to approve the application. Laniger requested that the Department to act on the permit application, and the Department denied the application on April 6, 2005. The Department's Notice of Permit Denial stated that the permit was denied because Laniger had not connected to the available centralized wastewater collection and treatment system nor provided reasonable assurance that the WWTP "is not impacting water quality within the Indian River Lagoon System." Laniger filed a petition challenging the permit denial and that petition is the subject of DOAH Case 05-1599, which was consolidated for hearing with this enforcement case. Laniger's permit expired on August 25, 2004. Laniger has operated the plant continuously since the permit expired. Count II: Failure to Submit Progress Reports Count II of the NOV alleges that Laniger failed to comply with the requirement of the administrative order to provide the Department with semi-annual reports of Laniger's progress toward connecting to a centralized sewage collection and treatment facility or providing reasonable assurances that continued operation of the WWTP would not be a threat to the water quality of the lagoon system. Laniger maintains that its groundwater monitoring reports satisfied the requirement for the semi-annual progress reports because they showed that the WWTP was meeting applicable water quality standards. The requirement for groundwater monitoring reports was set forth in a separate section of Laniger's permit from the requirement to provide the semi-annual progress reports. The monitoring reports were for the purpose of demonstrating whether the WWTP was violating drinking water quality standards in the groundwater beneath the WWTP site. They served a different purpose than the progress reports, which were to describe steps taken by Laniger to connect to a centralized sewage collection and treatment facility. Laniger's submittal of the groundwater monitoring reports did not satisfy the requirement for submitting semi-annual progress reports. There was testimony presented by the Department to suggest that it believed the semi-annual progress reports were also applicable to Laniger's demonstration of reasonable assurances that the WWTP was not a threat to the water quality of the lagoon system. However, the progress reports were for the express purpose of "outlining progress toward compliance with the time frames specified in paragraph 1." (emphasis added) The only time frame mentioned in paragraph 1 of the administrative order is connection to an available centralized wastewater collection and treatment facility "within 150 days of its availability." There is no reasonable construction of the wording of this condition that would require Laniger to submit semi-annual progress reports related to reasonable assurances that the WWTP is not a threat to the water quality of the lagoon system. Count III: Department Costs In Count III of the NOV, the Department demands $1,000.00 for its reasonable costs incurred in this case. Laniger did not dispute the Department's costs.

Florida Laws (5) 120.569120.68403.088403.121403.161
# 8
WERNER JUNGMANN vs. HARVEY B. ULANO AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-000551 (1981)
Division of Administrative Hearings, Florida Number: 81-000551 Latest Update: Jun. 18, 1981

Findings Of Fact By application filed on October 29, 1980, Respondent/Applicant, Harvey B. Ulano, sought the issuance of a permit from Respondent, Department of Environmental Regulation, to authorize the construction of a private pier for mooring a sailboat at 2640 Northwest Collins Cove Road, Stuart, Florida. A copy of the permit application may be found as DER Exhibit 1. The property in question lies on the North Fork of the St. Lucie River in St. Lucie County. The River is classified as a Class III Water of the Sate. Respondent/Applicant's proposal was received by the Department and reviewed for compliance with applicable State water quality standards. The Department concluded that all statutory and rule requirements, criteria, standards and provisions had been met, including those pertaining to biological productivity impact, water quality and navigation. On January 23, 1981, the Department issued its Letter of Intent to Issue a permit with certain conditions therein, including a prohibition against any dredging and filling associated with the project, the required restoration of submerged lands disturbed by construction activities to their original configuration, the employment of an effective means of turbidity control, and a prohibition against live aboards on boats docked at the pier. A copy of the Letter of Intent to Issue may be found as DER Exhibit 2. The applicant intends to construct a 276 foot long pier from an existing concrete retaining wall on his property which fronts the St. Lucie River. The pier will be built at a perpendicular angle with the shoreline and will be 6 feet wide for the first 240 feet, and 12 feet wide for the remainder of its length. There will be no building or boathouse constructed on the dock, nor will pilings extend above the docking until the area where the boats will be tied. The river is approximately 1500 to 2000 feet wide at the proposed project site. However, the depth of the water close to the shoreline is not sufficient to moor larger boats at low tide. Therefore, it is necessary that the length of the pier be 276 feet in order to insure a minimum 3-foot water depth at all times. Applicant's lot is odd-shaped in size. The waterfront footage is approximately 135 feet. Its sides measure approximately 330 feet on the north boundary and 200 feet on the south. The property of Petitioner, Werner Jungmann, adjoins that of Applicant on the south side and also fronts the river. The pier will be constructed on the northwest corner of Ulano's property, which is the most distant point from Jungmann. Because of the odd shapes of the Applicant's and Petitioner's lots, the end of the pier will project slightly within the lakeward extension of Jungmann's property line. However, the design of the pier is such that it should not obstruct or impair the view of the river now enjoyed by the Petitioner. Navigation in the river and existing channel adjacent to the pier will not be affected by the proposed activity. The shallow water depth in the river next to the shoreline already precludes movements by boats close to the shore. The Department has imposed certain conditions upon the construction and future use of the pier (DER Exhibit 2). These conditions, together with the plans submitted by Applicant (DER Exhibit 1), constitute reasonable assurances that the short-term and long-term effects of the proposed activity will not result in violations of the water quality criteria, standards, requirements and provisions of the Florida Administrative Code, and that the proposed activity will not discharge, emit or cause pollution in contravention of Department standards, rules or regulations.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Regulation issue Respondent/Applicant, Harvey B. Ulano, a permit to construct a private pier for mooring a sailboat on the North Fork, St. Lucie River, subject to those conditions set forth in the Department's Letter of Intent to Issue dated February 23, 1981. DONE and ENTERED this 29th day of May, 1981, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 Filed with the Clerk of the Division of Administrative Hearings this 29th day of May, 1981. COPIES FURNISHED: Ernon N. Sidaway, III, Esquire Post Office Box 3388 Fort Pierce, Florida 33454 Alfred J. Malefatto, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Edward B. Galante, Esquire Suite 310 Florida National Bank Building 301 East Ocean Boulevard Stuart, Florida 33494

Florida Laws (1) 120.57
# 9
OTTO STANGL vs CENTURY REALTY FUNDS, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 01-004919 (2001)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Dec. 26, 2001 Number: 01-004919 Latest Update: Dec. 20, 2002

The Issue The issue in this case is whether the Southwest Florida Water Management District (District) should issue to Century Realty Funds, Inc. (Century) Environmental Resource Permit (ERP) No. 44000227.002 (the ERP), which would modify Management and Storage of Surface Waters (MSSW) Permit No. 400227.000 (the Permit) and Stormwater Exemption No. EO1481, issued by the District to Century in July 1985 for construction of a surface water management system for Angler's Green Mobile Home Park located in Mulberry, Polk County, Florida.

Findings Of Fact The District issued Management and Storage of Surface Waters (MSSW) Permit No. 400227.000 and Stormwater Exemption No. EO1481 to Century in July 1985 for construction of a surface water management system for Angler's Green Mobile Home Park (MHP) located in Mulberry, Polk County, Florida. Angler’s Green MHP Angler’s Green MHP is an 83-acre residential golf course development of approximately 385 homes located off of State Road 37 near Mulberry. Residents at Angler’s Green own their own mobile homes and lease the residential lots pursuant to annual leases expiring December 31 of each year, with guaranteed renewal conditioned upon owner compliance with the terms and conditions of the lease. Prior to being developed as a mobile home park, the property which is now Angler’s Green MHP was part of a phosphate mining operation and was reclaimed under a phosphate mining land reclamation plan approved by the Florida Department of Natural Resources and a reclamation contract dated September 4, 1984. Final contours of the Angler’s Green site were made in accordance with the approved reclamation plan. After reclamation contouring, a 23-acre manmade (former phosphate mine pit) lake remained in the northeast quadrant of the Angler's Green site. The resulting lake had a finger arm (bay or cove) extending from the southwest corner of the main body of the lake, oriented in a north-to-south direction and located west of a peninsula of land extending into the northwest part of the lake from the north. The lake also had a short, narrow canal leading into the main body of the lake from the south; the canal connected at a right angle to longer narrow waterway to the south of and extending parallel to the main body of the lake in an east-to-west orientation. There also were two smaller ponds on the property after reclamation contouring. After reclamation, surface water onsite generally flowed westerly and discharged from the property to a railroad ditch along the western boundary of the property. The recorded post-reclamation, pre-development water level for the 23-acre lake, as indicated on the site grading plans, was around 127.1 to 127.8 feet above Mean Sea Level (M.S.L.). The 1985 Permits On July 10, 1985, the District issued MSSW Permit No. 400227.000 and Stormwater Exemption No. EO1481 to Century to authorize the construction of a surface water management system for Angler’s Green. The MSSW Permit had an expiration date of July 10, 1988. As designed, the permitted Angler’s Green surface water management system was to route internal stormwater runoff to swales, detention ponds, and catchment areas before discharging through a sidebank sand filtration system (a berm approximately 300 feet long containing an 8” perforated drain pipe covered by a filter fabric and sand filter material) to receiving waters at the northwest corner of the property. The permitted system was designed with five drainage areas known as Basins A through E. Basin A was in the southeast quadrant of the site; Basin B was to its east in the southeast quadrant of the site; Basin E was to the north of Basin A and included the 23-acre former phosphate mining pit reclaimed as an artificial lake, which was referred to as “Lake E” or sometimes “Pond E"; Basin C was to the west of Basin E; and Basin D was to the west of Basin C and to the north of Basin B. The two smaller ponds on the property were designated Pond C-1 and Pond B-1 and were located in Basin C and Basin B, respectively. Basin D was in the northwest corner of the site; the discharge structure was in the northwest corner of Basin D. As the system was designed, stormwater from Basin E would appear to sheet flow naturally into Lake E; stormwater from Basin A would appear to flow naturally to the southwest, away from Lake E, but the system routed the water from the southwest corner of Basin A to the western end of the waterway on Lake E through an underground pipe. Stormwater from Basin B was to flow to and be retained in Pond B-1; as the system was designed, surface water was not designed to discharge offsite from Basin B. As designed, Lake E served as a detention pond for water from Basin E and Basin A. It was to have a control structure (CS-1) in the arm of Lake E that would produce a seasonal fluctuation range of two feet, from 127.5’ above M.S.L. to 129.5’ above M.S.L. Stormwater discharging from CS- 1 was to be conveyed by pipe to Pond C-1, where it was to mingle with surface water draining from Basin C. When full, Pond C-1 would cascade into the golf course area in Basin D and, as necessary, in a portion of Basin B. After catchment and detention in the golf course area, overflow was eventually and ultimately to discharge offsite through the side-bank sand filtration system in the northwest corner of Basin D. In this manner, the Angler’s Green surface water management system was designed to accommodate the 24-hour, 25- year storm event, which was estimated to produce approximately 8 inches of water in a 24-hour period. It also was designed to comply with the water quality requirements as specified in Florida Administrative Code Chapter 17-25 (1985 Ann. Supp.) by detaining the first half-inch of runoff before discharging it offsite through the sidebank sand filtration system in the northwest corner of Basin D. (All rule citations are to the Florida Administrative Code.) Omission of the Stangls During the review process, the District noted from drawings submitted as part of Century's MSSW Permit application that the project area did not include approximately the eastern third of the main body of Lake E. District staff brought this to Century's attention in a request for additional information (RAI) and stated: "If possible, you should obtain a perpetual right to operate and maintain the lake from other owners." In response, Century falsely represented to the District that L. Kirk McKay, a joint venture partner of Century, was the only riparian owner on Lake E and that Century had obtained from him a perpetual right to operate and maintain Lake E as part of the MSSW Permit. In fact, the Stangls owned property on the east side of the lake, including approximately 500 feet of lakefront and contiguous lake bottom. The Stangls and two partners purchased the property from McKay himself in 1979. The Stangls bought out their partners in 1984. The District relied on Century's misrepresentation. The District would not have issued the MSSW Permit to Century if the District had known that Century did not own or control all the land being used for the Permit--specifically, including all of Lake E. See Rule 40D-4.101(1)(d) and (2)(d)6. (1985) (application must include "evidence of ownership or control"). In addition, because the District was unaware of the Stangls' ownership of a portion of Lake E, the District did not require Century to give the Stangls direct, actual notice of the Century's permit application. Instead, the District only required that Century publish notice of the District’s receipt of the permit application. Notice was published on April 3, 1985, in the Lakeland Ledger, a newspaper of general circulation qualified under the terms of Section 50.011, Florida Statutes. But the Stangls did not see the published notice, were unaware of the permit application, and did not ask to participate in the permitting process. The Stangl property adjacent to Angler’s Green remained undeveloped and unoccupied until 1999, when the Stangls' son, John, established a business on the site. Prior to 1999, the Stangls visited the property a couple times a year. They were fully aware of the construction and operation of Anglers Green as a mobile home park across Lake E. During this time, Century leased 385 lots with guaranteed annual renewal conditioned only upon compliance with lease terms and conditions. Amenities under the leases included clubhouse and golf course privileges. At no time before 2000 did the Stangls take any action to challenge the validity of Century's 1985 MSSW Permit. 1985 Surface Water Management Permitting Requirements In 1985, permitting requirements for surface water management systems were divided between two regulatory schemes. Surface water management permits in Polk County were issued by the District under Chapter 373, Florida Statutes, and Rule Chapters 40D-4 and 40D-40, which addressed water quantity and flooding issues for projects greater than and less than 40 acres, respectively. Water quality permits or exemptions from water quality permitting requirements were issued by the Department of Environmental Regulation under Chapter 403, Florida Statutes, and Rule Chapter 17-25 to address water quality concerns. It was not until 1988 that permitting requirements were consolidated into the MSSW regulatory program administered by the District under Rule Chapters 40D-4 and 40D-40. In 1985, the District did not have a Basis of Review (BOR) to specify system design requirements for applicants to provide reasonable assurances that the conditions for issuance of surface water permits were satisfied. Standards and criteria for the design and performance of surface water management systems were contained in Rule 40D-4.301(2) (1985) Under subsection (2)(i) of that rule, projects designed to meet the requirements of Chapter 17-25 [Regulation of Stormwater Discharge] were presumed to meet applicable State water quality requirements. There were no requirements for wet detention pond littoral zones. 20. Under Rule 17-25.03(2)(b) (1985 Ann. Supp.), stormwater management systems for projects with drainage areas less than 100 acres that provided retention or detention with filtration of the first half-inch of runoff were exempt from the permitting requirements of Rule Chapter 17-25. 21. In 1985, District Rule 40D-4.301(2)(j) (1985) allowed for natural areas and existing water bodies to be used for stormwater retention or detention purposes when not in conflict with environmental or public use considerations. Areas that could be considered for this purpose included previously-degraded areas or man-made areas (such as borrow pits). Apparently, the District allowed Century to use Lake E as a detention pond under this provision. Deviations from MSSW Permit Angler’s Green MHP was constructed in two phases, with the first phase completed in 1985, and the second phase completed in 1987. Construction of at least the part of the surface water management system to serve the first phase took place prior to 1985; it was not clear from the evidence whether construction of the part of the surface water management system to serve the second phase also took place prior to 1985, but it clearly took place prior to construction of the second phase in 1987. Condition No. 4 of Century's MSSW Permit required the submittal of a certification that the system was constructed in accordance with the approved and permitted design. But Century did not provide any such certification. Century also never certified to the District that its new stormwater discharge facility, as constructed, continued to qualify for exemption from State water quality requirements. Although the surface water management system was constructed and operating, the District never transferred the 1985 Permit to the operation phase. In several respects, the Angler’s Green surface water management system was not constructed as designed, approved, and permitted in 1985. The pipe to convey stormwater from the southwest corner of Basin A back to the Lake E waterway apparently never was constructed; instead, stormwater from Basin A was routed to Pond B-1. (There also was a berm constructed in Basin A near the southern boundary of the site; but that berm apparently was a visual berm, and there was no evidence that it affected performance of the surface water management system.) Control structure CS-1 (which was supposed to be located in the arm or bay of Lake E) and the pipe to convey overflow from there into Pond C-1 also never were constructed. By the early 1990's, Angler's Green was experiencing flooding in the golf course area in Basin D and B for extended periods of time. In November 1993, the District responded to a complaint of flooding in that vicinity. Upon investigation, the District determined that malfunction of the surface water management system serving Reservation Lakes (now known as Paradise Lakes), a development to the north and downstream of the Angler's Green system, was causing water to back up through the wetlands and the sand filtration system in the northwest corner of the Angler’s Green project. As a result, water overtopped the discharge structure, equalized at levels above the top of the discharge structure's berm, and flooded the golf course for extended periods of time. At some undetermined point in time, an unpermitted pond was dug in Basin D, apparently in an attempt to alleviate flooding of the golf course. In addition, possibly for the same purpose, a pump was installed in Basin D near Pond C-1, and a pipe was installed to convey stormwater from there into Lake E. The sidebank sand filtration system designed to provide filtration of stormwater prior to discharge from the northwest corner of the site does not appear to exist today. It may be present but difficult to see after 15 years of plant growth; or it may have been removed or disturbed as a result of re-grading in the area. However, the evidence proved that the discharge structure was present in 1993, and there is no reason to believe that it was not installed during construction of the surface water management system--i.e., by 1987 at the latest. In addition, at some undetermined point in time, a pipe was installed at the northeast corner of Lake E to convey overflow from Lake E eastward to a drainage ditch located alongside SR 37 to the north of the Stangls' property. No witnesses could testify as to when the pipe to the SR 37 ditch was installed or its elevation. (The District and Century state in their PRO that Map No. 2 in P/I Exhibit 14--an aerial map/survey submitted to the District by Century on August 13, 1990, as part of Century's 1990 Water Use Permit No. 209993.000 application--notes the pipe's elevation as 127.95 feet above M.S.L.; but no such finding could be made from review of the exhibit.) Roads in Angler's Green have inverted crowns to convey runoff from roads, driveways, and roofs away from mobile home lots. Some runoff from these impervious surfaces appears to be directed into a swale on the east side of the site; this swale leads to Lake E. In addition, approximately 12 drains have been installed in or near roads in Angler's Green that convey water through pipes directly into Lake E or Pond C-1. Under current Rule Chapters 40D-4 and 40D-40, road drains connecting impervious surfaces to Lake E would have to be shown on application construction drawings, and separate stormwater calculations would have to be provided in an application. But in 1985 this was not required. Century's calculations, together with flow arrows on drawings showing the direction of stormwater flow towards the detention ponds, were considered sufficient--especially since Century's calculations used a relatively high runoff co-efficient. As a result, the existence of these drains and pipes are not considered to be substantial deviations from the original, approved design. Similarly, approximately 64 roof drains and pipes conveying water from roofs directly into Lake E and Pond C-1 would not be considered substantial deviations from the original, approved design. In addition, these apparently were installed by mobile homeowners over the years, not by Century. From 1985 to 2000, the District did not have occasion to address regulatory concerns at Angler’s Green, except for the complaint of flooding in the golf course area that occurred in November 1993 and a more recent complaint about an area of the golf course that was designed to flood under certain conditions. Otto Stangl’s Complaint and the District’s Response Around November 1999, John Stangl noticed a fish kill in the ditch along SR 37 near the Stangl property. He also was contacted by a governmental compliance officer concerning the fish kill. Upon investigating, John Stangl saw the unpermitted pipe leading from Lake E that was discharging into the SR 37 ditch where the fish kill was observed, as well as the unpermitted pump that was pumping water from the Angler’s Green golf course area through a pipe that discharged into Lake E. In February 2000, Otto Stangl complained to the District about the fish kill and the existence of the unpermitted structures associated with Lake E. Upon receiving Otto Stangl’s complaint, District staff conducted site visits of the Angler’s Green project. Staff observed the unauthorized pump and pipe conveying water from Pond C-1 to Lake E and the unauthorized pipe conveying water from Lake E to the SR 37 ditch. Staff also observed that the Lake E control structure was missing, the pipe to convey stormwater from Basin A to Lake E was missing, and Basin D had been re-graded. In February 2000, the District also became aware of the fact that Century did not have full ownership or control of Lake E. On March 15, 2000, the District issued Century Notice of Non-Compliance and directed Century to either construct the system as designed and permitted or to seek a permit modification. On May 8, 2000, Century submitted a letter application to modify the original MSSW Permit No. 400227.000 by constructing the originally permitted Lake E control structure and pipe conveying water from Lake E to Pond C-1, but in a different location in Lake E than originally permitted due to the existence of homes at the location where these structures were originally planned. The application was subsequently amended to be a formal modification upon Century’s request for further modification to allow Basin A stormwater to flow to Pond B-1 and to expand Pond B-1 and add a control structure and an effluent filtration system. Despite having actual knowledge since at least February 2000 that the Angler's Green surface water management system was built partially on their property, the Stangls did not ask for a hearing on the 1985 Permit. Instead, they awaited the District's consideration of Century's modification application and sought to challenge the District's notice of intent to grant the modification permit issued on October 29, 2001. The District’s Regulatory Compliance Practices In the 1980's, the District appeared to pay little or no attention to construction of permitted projects or submission of required post-construction certifications. Many projects permitted by the District in the 1980’s, such as Angler’s Green, were built and operating although no certifications had been submitted; as a result, the permits issued for these projects never were transferred to the operation phase. Eventually, some projects not built in compliance with issued permits came to the attention of the District, typically through third-party complaints about drainage problems and flooding. By this time, there was a large backlog of issued construction permits for which no required post-construction certifications had been submitted. The backlog of these older projects was so large that the District decided not to initiate an aggressive, systematic, and comprehensive review of all permits for which no required certifications had been submitted. Instead, projects were checked on an ad hoc basis as complaints regarding the functioning of their surface water management systems were registered. When it came to the attention of the District in this manner that a project had been built under an MSSW permit but that no required certifications had been submitted, the District first attempted to secure the required certifications in the form of certified as-built construction drawings and a Statement of Completion, as required by BOR 2.7. In so doing, it was common practice for the District to accept certifications beyond the expiration date on a permit. If projects were substantially completed, the District would not deem the permit as expired simply because the required certifications had not been submitted before the expiration date; and such projects did not lose their status as being permitted. It should be noted that, according to the testimony of the District's expert, William Hartmann, this agency practice was not based on an interpretation of Rule 40D- 4.321(1)(b) (1985) (on duration of construction permits). Rather, the agency practice was to ignore the expiration of the construction permit under those circumstances. In addition, it does not appear from the evidence that the District ever before has faced the situation presented in this case--where a person on whose property part of a surface water management system was built without the person's consent opposes modification and asserts the construction permit has expired. In cases where the agency's practice was applied, if the required certified as-built construction drawings and Statement of Completion could not be provided because the project was not built in accordance with the MSSW permit, the District would require the permittee to either bring the system into compliance with the approved permit designs or obtain a modification of the construction permit. Letter modifications would be accepted when the requested modification would not substantially alter the permit authorization, increase the authorized offsite discharge, impact the environmental features of the project, decrease the required retention/detention, decrease the required flood control elevations for roads or buildings, or decrease pollution removal efficiency. See Rule 40D-4.331(2)(b) (1985). (The current version of the rule adds renewal or extension of the existing permit duration.) Alterations meeting the threshold requirements for a letter modification would be presumed to meet the conditions for issuance for a permit. Otherwise, formal permit modifications would be required. When application is made for a permit modification, the District’s practice is to evaluate those aspects of the surface water management system being modified. Review generally would not extend to the entire system. Permittees seeking to modify their surface water management systems generally are not required by the District to bring the unmodified portions of the system into compliance with current design criteria. Proposed ERP Permit Modification ERP Application No. 44000227.002 seeks authorization to modify portions of the Angler’s Green surface water management system. The specific alterations for which approval is sought are: permanent removal of the existing, unpermitted 18-inch pipe between Lake E and SR 37 roadside ditch; permanent removal of the pump and associated piping conveying water from Pond C-1 to Lake E; installation of the control structure (CS-1), together with installation of pipe to convey water from the control structure to Pond C-1, as designed and approved in the 1985 Permit but different location in the northwest corner of the main body of Lake E; re-grading of the northwesterly portion of the golf course to more closely conform to the original permitted plan and help keep Basin B separate from Basin D; reconstruction of the side-bank sand filter system in the northwest corner of the property, as designed and approved in the 1985 Permit but with a slightly higher invert elevation (122.04 feet above M.S.L.) to prevent water from backing up into Angler's Green from Paradise Lakes again, and with a concrete flume and spreader swale between Pond C-1 and the berm of the side-bank sand filter system; enlargement of Pond B-1; installation of a control structure on Pond B-1; and installation of 100 feet of 6-inch side-bank sand filter discharging to the southwest corner of the property from Pond B-1. By removing the unpermitted pipe to the roadside ditch along SR 37 and by constructing control structure CS-1, with the same control elevations as in the 1985 Permit (albeit at a different location in Lake E), and connecting CS-1 by pipe to Pond C-1 as envisioned in the 1985 Permit, the function of Lake E should approximate its function under the design approved in 1985. Modifying the permitted design to authorize Basin A to flow to Pond B-1 instead of Lake E results in less water flowing to Lake E; these changes will not increase water quantity or quality impacts to Lake E, as compared to the 1985 Permit. As compared to reclamation conditions prior to implementation of the 1985 Permit, water quantity and quality impacts to Lake E would be expected both under the system as designed and permitted in 1985 and as proposed to be modified, by virtue of the similar use of Lake E as a detention pond under either system. Pond B-1 is being enlarged to better accommodate the flow from Basin A. The control structure being added at Pond B-1 will control flow into the swale to the west so as to address water quantity impacts in that area. Stormwater calculations for the revised Pond B-1 demonstrated that the post-development discharge rate will not exceed the pre- development discharge rate, so that there are no concerns for adverse water quantity impacts to receiving waters or adjacent lands or flooding impacts to on-site or off-site property. The historical flows to the west are still maintained. The discharge structure being added at Pond B-1 will account for treatment of the Basin A flow. Based on calculations for revised Pond B-1, the enlarged pond will retain and percolate half an inch of stormwater runoff from the contributing area in 36 hours (which is consistent with current BOR design requirements). The proposed Pond B-1/Basin B modifications, including the routing of Basin A stormwater to Pond B-1, will not adversely affect the quality of receiving waters in that vicinity such that state water quality standards would be violated. Angler's Green is located in the Southern Water Use Caution Area of Polk County. No surface or groundwater levels or surface water flows have been established for this area under Section 373.042, Florida Statutes. The proposed modifications do not involve any works of the District. The proposed modifications are based on generally accepted engineering and scientific principles and employ treatment methods of effluent filtration which involve commonly accepted designs that can be effectively performed and function as proposed. There are no concerns about Century’s financial, legal, or administrative capability to undertake the proposed modifications as specified in the permit, if issued. There are no applicable special basin or geographic area criteria established for this area. Environmental Concerns As with its review of the proposed permit modification for water quantity impacts, the District's review of environmental concerns was limited to review of impacts from the proposed modifications to the original permitted design; unmodified portions of the original permit were not reviewed for compliance with current requirements. An approximately 20 square-foot permanent impact is proposed to Lake E due to the placement of the control structure (SW-1) in the water. A 379 square-foot temporary impact is proposed to Lake E due to the placement of a cofferdam to facilitate construction of the control structure. Temporary impacts to Lake E resulting from the construction of the control structure would be addressed through the use of sediment and erosion controls to prevent possible sedimentation and turbidity that may arise during the construction activity. The placement of a control structure in Lake E would create very minor permanent impacts resulting from the loss of the footprint of the control structure. These impacts would be insignificant. Due to the very minor nature of these proposed impacts, no mitigation would be required, and no loss of wetlands would be required to be recorded on the Wetlands/Surface Water Table. Construction of SW-1 would not adversely impact the value of functions provided to fish and wildlife, and listed species including aquatic and wetland dependent species, by wetlands, other surface waters and other water related resources of the District. No secondary impacts would be expected from construction of SW-1. No unacceptable cumulative impacts upon wetlands and other surface waters would be expected to occur as a result of construction of SW-1. The project area includes .71 acre of herbaceous/forested wetlands (WL-1) in the northwest corner. The potential for secondary impacts is addressed by an existing fence surrounding WL-1, which eliminates concerns for secondary impacts to this wetland area. No adverse impacts would be anticipated to occur to these wetlands, and no adverse secondary impacts to the water resources would be expected to occur as a result of the proposed modifications themselves. The proposed modifications would not cause unacceptable cumulative impacts to wetlands and other surface waters. Class II or Class III waters would not be affected by the proposed modification project. Therefore, Rule 40D- 4.302(1)(c) is not applicable. No seawalls, lagoons or estuaries are involved in this project. Therefore, Rule 40D-4.302(d) is not applicable. The proposed modifications would not be contrary to the public interest. Relocation of a control structure and enhancement of the Basin B portion of the system would create no significant change in impacts. The proposed modifications constitute a slight improvement over water quality from the original permitted design. No threatened or endangered species were identified for Angler’s Green. The proposed relocation and construction of the Lake E control structure, preservation of onsite wetlands in the northwest corner, and re-design of Pond B-1 present no environmental concerns. Consequently, the proposed modifications do not create any potential for adverse effects regarding the conservation of fish and wildlife, including endangered or threatened species or their habitats. The proposed modifications do not adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity. The project area does not involve navigable waters and does not affect the flow of water or cause harmful erosion or shoaling. Hence, Rule 40D-4.302(1)(a)(3) does not apply to this permit modification application. There are no significant historical and archaeological resources involved in this Project. Therefore, Rule 40D-4.302(1)(a)(6) is not applicable to this permit modification application. The proposed modifications would not be contrary to the public interest; they would not adversely affect the public health, safety or welfare or the property of others. No adverse impacts are anticipated to occur as a result of the proposed modifications. The proposed modifications maintain the historic water elevation for Lake E and maintain historic flows for the project area. The modified system should also provide some improvement in water quality.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order denying Century's permit modification application designated ERP No. 44000227.002. DONE AND ENTERED this 8th day of July, 2002, in Tallahassee, Leon County, Florida. ________________________________ J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of July, 2002. COPIES FURNISHED: Joseph D. Magri, Esquire Merkle & Magri, P.A. 5510 West LaSalle Street Tampa, Florida 33607-1713 Joseph P. Mawhinney, Esquire Clark, Campbell & Mawhinney, P.A. Post Office Box 6559 Lakeland, Florida 33802 Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 E. D. Sonny Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899

Florida Laws (4) 120.57373.04250.01190.803