Findings Of Fact The Respondent/Applicant, Jeffrey David Evans, applied to the Department of Environmental Regulation and the Army Corps of Engineers for a permit to construct a dock and boathouse as depicted on Respondent's Exhibit 1. The proposed length of the dock and boathouse is sixty feet from the seawall marking the landward boundary of the Halifax River and the waterward boundary of the Respondent/Applicant's property. The Department of Environmental Regulation advised Evans as well as the protesting Petitioner on March 9, 1981, of its intent to issue the permit. The Army Corps of Engineers issued a general permit numbered SAJ-20(MOD) on September 4, 1979, also authorizing construction of the proposed dock with the condition that it not extend in a waterward direction to a water depth contour deeper than four feet at mean low water. The Petitioner herein timely petitioned for a hearing protesting the decision by the DER to grant the permit. The parties do not dispute and indeed have stipulated that there will be no adverse impact on the conservation of fish and wildlife in the area and no significant chemical, biological or physical alteration of the state waters and marine or aquatic life involved. In short, it was stipulated that there are no adverse environmental impacts of any kind to be occasioned by construction of the project. Mr. James Morgan of the Department staff was qualified as an expert witness in aquatic ecology and the evaluation of dredge and fill projects. He testified at the hearing and established that the Respondent/Applicant had provided affirmative reasonable assurances to the Department that the proposed project would not result in any violations of state water quality standards and that the proposed project would not result in interference with the conservation of fish and wildlife in the subject area or the capability of the local aquatic habitat to support such fish and wildlife. Mr. Morgan also testified that reasonable assurances had been provided by the Respondent Applicant that the proposed project would not create a navigational hazard or a serious impediment to navigation, and that an unobstructed navigable channel would remain after the project was constructed. There being no question that affirmative reasonable assurances have been provided that no state water quality standards will be violated and that no other adverse environmental impacts will occur within the purview of Chapter 403, Florida Statutes, or Chapter 17, Florida Administrative Code; the permit in this regard should be granted. A question remains, however, regarding the maximum length the dock should achieve in a perpendicular direction from the seawall of the Respondent/Applicant's property out into the river. Evidence propounded by the Department regarding a six-foot water depth off the end of the proposed sixty- foot dock site is based upon hearsay information received from a Department employee other than the witness who testified, who in turn received it through a telephone conversation with, another party with no evidence that soundings or other types of survey were made. Mr. Evans' own testimony establishes that he measured some six and eight-foot depths in the natural channel involved herein, but his testimony is not specific enough in reflecting at what points in that channel, in relation to the site of the proposed dock, he measured those depths nor at what stage of the tide he measured them. It is established in the record that there is approximately a one-foot rise and fall between mean low water and mean high water at the subject site. The only access by navigation to the Petitioner's home from the main channel of the Intracoastal Waterway is by means of a natural channel running in a northerly direction parallel and immediately in front of the Petitioner's home and the applicant's home and inshore from a large sand bar covered with oysters which is a permanent oyster bar protruding from the water at low tide. The channel continues from the Petitioner's home northerly and parallel to the applicant's home and seawall until it reaches the northern terminus of the sand bar. From that point a boat navigating the channel can turn out into the main channel of the Intracoastal Waterway. Unrefuted evidence propounded by the Petitioner in the form of a "multi-sounding" depth survey established that the channel's depth at mean high tide ranges from four to five feet in front of the Respondent/Applicant's property (See Exhibit 13) The Petitioner established that access to the Intracoastal Waterway is only feasible through the subject channel running in front of the Respondent/Applicant's property. The Petitioner established that the channel begins with a depth of four feet at low tide or five feet at high tide as its landward boundary which lies fifty-two feet from the Respondent/Applicant's seawall. Thus, a dock extending the proposed sixty feet from the seawall would approach the middle of the subject historic channel and would constitute an impairment to navigation of that channel. In apparent recognition of the question of navigability of this historic channel, which was shown to have a depth of five feet at mean high tide, the Corps of Engineers has issued a permit to the Respondent/Applicant to construct his dock to a point no farther waterward than the four-foot mean low water depth contour of the river. This would allow the dock to extend to the boundary of the channel and would thus allow a dock to be constructed fifty-two feet in a perpendicular direction from the Respondents Applicant's seawall. The parties agree that four feet of water is required for navigability in and around the subject, historic channel. Thus, if the dock extended to the depth of four feet at low tide, which would be five feet at high tide, it would extend into the navigable channel and not allow a sufficiently safe distance waterward of the end of the dock for boats to turn around the end of the dock to negotiate the canal adjacent to the Petitioner's home, especially if Evans' boat is moored at the end of the dock. Accordingly the dock should only extend to that point, denominated on Exhibit 13, which is characterized by a depth at high tide of four feet and which lies six feet landward from the fifty-two-foot extent of dock which the Corps of Engineers' permit would allow. Thus, if the dock were to be built forty-six feet in a perpendicular direction from the seawall an additional six feet would be allowed for the mooring of the Respondent/Applicant's boat off the end of that dock without unduly obstructing navigation in the channel. It is noteworthy in this regard that no witness from the Corps of Engineers, or who was instrumental in the approval of the Corps of Engineers permit, testified at the hearing.
Recommendation In consideration of the foregoing findings of fact and conclusions of law, the evidence in the record, the candor and demeanor of the witnesses and pleadings and arguments of counsel, it is RECOMMENDED: That the Department enter a Final Order granting the requested permit authorizing construction of a private dock and boathouse on the Halifax River in Port Orange, Volusia County, Florida, by Jeffrey David Evans, provided however, that said dock shall not extend a greater distance than forty-six feet in a direction perpendicular to the Respondent/Applicant's seawall on the waterward margin of his property on the Halifax River. DONE AND ENTERED this 29th day of October, 1981, in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of October, 1981. COPIES FURNISHED: Jeffrey C. Sweet, Esquire Post Office Box 5386 Daytona Beach, Florida 32018 Jeffrey David Evans Twelve Venetian Circle Port Orange, Florida 32019 Richard P. Lee, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301
Findings Of Fact The Proposed Permit This case involves a 65-acre site in north Lee County owned by the City of Ft. Myers. At all material times, the land has been zoned under industrial- equivalent designations. By leases that are not part of this record, Ft. Myers has leased 21.4 acres of the 65 acres to various governmental agencies, including Lee County, Lee County Sheriff's Office, and possibly the Florida Department of Juvenile Justice (formerly known as Department of Health and Rehabilitative Services). The following facilities are presently located on the 21.4 acres: Juvenile Detention Center, Lee County Stockade, Price Halfway House, Sheriff's Office Aviation Department, and Emergency Operations Center. By lease dated September 20, 1993, Ft. Myers leased the remaining 43.6 undeveloped acres to Lee County for a term of 50 years. This lease allows Lee County to use the 43.6 acres for $1 per year, but only for the operation of a Juvenile Justice Facility. Under Paragraph 20 of the lease, Ft. Myers may terminate the lease if Lee County ceases to operate the facility. Likewise, Lee County may terminate the lease if the Department of Juvenile Justice ceases to fund the County's operation of the facility. Under the lease, preference is given to juvenile residents of Ft. Myers. Paragraph 22 of the lease allocates liability to Lee County for claims or damages arising from released fuels, including from pipelines. The lease is not assignable without Ft. Myer's consent. By agreement dated December 17, 1993, Ft. Myers consented to the sublease of the entire 43.6- acre parcel to the Department of Juvenile Justice for the purpose of the construction of a juvenile residential commitment facility. Lee County receives no rent from the Department of Juvenile Justice. In Paragraph 10 of the agreement, the Department of Juvenile Justice agrees to maintain, at its expense, "all improvements of every kind . . .." Lee County must make any repairs to improvements if the Department of Juvenile Justice fails to do so. By subsequent agreement, Respondent Department of Management Services (DMS) became the agent for the Department of Juvenile Justice for the design, permitting, and construction of the juvenile justice facility. By Application for a surface water management permit executed June 16, 1994, DMS applied for a surface water management permit for the construction and operation of a 10.9- acre project known as the Lee County Juvenile Commitment Facility. This 10.9-acre project is part of the 43.6 acres leased to Lee County and subleased to the Department of Juvenile Justice. The application states that the existing 21.4 acres of developed sites, which are leased under separate agreements to different governmental entities, "will be permitted as is." The Staff Review Summary of Respondent South Florida Water Management District (SFWMD) describes the purpose of the application as follows: This application is a request for Authorization for Construction and Operation of a surface water management system to serve a 10.9 acre Institutional project discharging to Six Mile [Cypress] Slough via onsite wetlands and road- side swales. The application also requests Authorization for Operation of a surface water management system serving a 21.4 acre existing facility and 32.7 acres to remain unchanged for a total permitted area of 65.0 acres. Staff recommends approval of both authorizations with conditions. The Staff Review Summary accurately states that the owner of the land is Ft. Myers. Of questionable accuracy is the statement that Ft. Myers leases to Lee County the 21.4 acres devoted to the five existing facilities. Although Lee County probably is a lessee of some of these parcels, the Lee County Sheriff's Office is the lessee (or perhaps sublessee) of at least two parcels. One of the other parcels may involve a state agency, again under either a lease or a sublease. The Staff Review Summary inaccurately states that the project developer is Lee County. The project developer is DMS or its principal, the Department of Juvenile Justice. The Staff Review Summary reviews the existing development on the 21.4 acres. The improvements consist of the 4.8-acre Juvenile Detention Center, 2.9- acre Price Halfway House, 4.7-acre Lee County Stockade, 5.1-acre Sheriff's Office Aviation Department, and 3.9-acre Emergency Operations Center. The Staff Review Summary states that the footer of the Juvenile Detention Center was inspected in February 1980. The site drains into a 1.2- acre retention pond, which was a natural pond dug out to accept the drainage from the Juvenile Detention Center. A small amount of surface flow drains from the Juvenile Detention Center to a perimeter swale that drains west into a ditch running along Ortiz Avenue. The Staff Review Summary states that the building permit for the Price Halfway House was issued in October 1982. The site drains into the 1.2-acre retention pond, which was apparently enlarged a second time to accept the additional flow. A small amount of the flow from the Price Halfway House also drains to the perimeter swale and west into the Ortiz Avenue ditch. The Staff Review Summary states that the building permit for the Lee County Stockade was issued on May 25, 1976. SFWMD issued an exemption and a determination that no permit was required for two additions to the stockade in 1988 and 1989. For the additional impervious surface added by these additions, one inch of water quality treatment was provided. After the abandonment of a pumping system, drainage of the stockade site consists of water building up in existing onsite ditches and sheet flowing into the Ortiz Avenue ditch. The Staff Review Summary adds that a small retention area constructed at the southeast corner of the site treats stormwater from the stockade and the Sheriff's Office Aviation Department. The summary adds that a small amount of stormwater drains north into an exterior swale that drains into the Ortiz Avenue ditch. The Staff Review Summary states that a building permit was issued for the Sheriff's Office Aviation Department in August 1977. Stormwater from the site sheetflows to exterior swales north and south of the building. When the swales fill up, the water flows into the Ortiz Avenue ditch. The Staff Review Summary states that a building permit was issued for the Emergency Operations Center on October 11, 1977. Drainage from the center flows directly into the Ortiz Avenue ditch. Under "Water Quality," the Staff Review Summary reports that SFWMD "did not require compliance with discharge rate or criteria" based on Section 1.6, Basis of Review for Surface Water Management Permit Applications within the [SFWMD] March 1994 (Basis of Review), which contains guidelines issued by SFWMD for the construction and operation of surface water management systems. The summary adds that there have been no "water quality or quantity complaints associated with this site over the past 18 years since its initial construction." Noting that a surface water management permit is requested for the entire 65-acre parcel, the Staff Review Summary states that the above-described drainage systems for the five existing facilities are "operational and will remain as they now exist." Turning to the proposed development, the Staff Review Summary states that the remaining 43.6 undeveloped acres "will also be leased to Lee County by the City for the proposed commitment facilities." The facilities are accurately described as a 5.2-acre halfway house and a 5.7-acre bootcamp, both of which will be drained by internal drainage swales and culverts flowing into detention areas, which will discharge through a control structure into onsite wetlands leading to the Ortiz Avenue swale. Addressing designed discharge rates, the Staff Review Summary acknowledges that the bootcamp's discharge rate will exceed the allowable rate for a 25-year, three-day storm event. The allowable rate is .33 cfs, and the design rate is .37 cfs. The Staff Review Summary explains that this discrepancy results from the use of the minimum size orifice (three inches) in the control structure. Addressing water quality, the Staff Review Summary reports that commercially zoned sites are required to provide one-half inch dry pretreatment for water quality unless reasonable assurance can be provided that hazardous material will not enter the surface water management system. Determining that no hazardous material will be stored or generated on the site, SFWMD did not require the one-half inch dry pretreatment of runoff. Noting that no surface water management permits have ever been issued for any part of the 65-acre parcel, the Staff Review Summary recommends that, subject to the customary Limiting Conditions, SFWMD issue: Authorization for Construction and Operation of a 10.9 acre Institutional Project discharging to Six Mile Cypress Slough via onsite wetlands and roadside swales, Operation of a 21.4 acre existing facility and 32.7 acres to remain unchanged for a total permitted area of 65.0 acres. Limiting Condition 4 states that the permittee shall request transfer of the permit to the "responsible operational entity accepted by [SFWMD], if different from the permittee." Limiting Condition 8 adds: A permit transfer to the operation phase shall not occur until a responsible entity meeting the requirements in section 9.0, "Basis of Review . . .," has been established to operate and maintain the system. The entity must be provided with sufficient ownership or legal interest so that it has control over all water management facilities authorized herein. Special Condition 11 states: "Operation of the surface water management system shall be the responsibility of Lee County." The Permittee and the Entity Responsible for Maintenance The proposed permit consists of two authorizations. The first authorization is for the construction and operation of the surface water management system on the 10.9-acre parcel on which will be constructed the bootcamp and halfway house. The second authorization is for the operation of the existing surface water management system on the already-developed 21.4 acres and the unimproved surface water management system on the remaining 32.7 acres. There are two problems with the designation of Lee County as the entity responsible for maintaining the permitted surface water management systems. Basis of Review 9.1.B states: To satisfy [P]ermit [L]imiting [C]ondition [8], the Permittee must supply appropriate written proof, such as either by letter or resolution from the governmental entity that the governmental entity will accept the oper- ation and maintenance of all the surface water management system components . . .. The authorization for operation of the systems on the 21.4-acre and 32.7-acre parcels does not await any construction. Once the permit is issued, the authorization is effective. Therefore, all prerequisites to the designation must have been satisfied before the operation permit issues. For the 21.4-acre parcel, DMS has not provided reasonable assurance that Lee County is the lessee or sublessee of all of the parcels underlying the five existing facilities. In fact, it appears that Lee County is not the lessee or sublessee of all of these parcels. Even if Lee County were the lessee or sublessee of these five parcels, DMS has not provided reasonable assurance that Lee County has assumed responsibility for the maintenance of the surface water management system for the five parcels. Contrary to Basis of Review 9.1.B, there is no written agreement by Lee County to assume operational responsibility, nor is there even an actual agreement to this effect. SFWMD's rules sensibly require that written consent be obtained before the operation permit is issued. Likewise, DMS has failed to show that Lee County has agreed to assume responsibility for the operation and maintenance of the surface water management system for the 32.7-acre parcel. Again, SFWMD must obtain written consent before issuing the permit because no construction will precede operation for the surface water management system on this parcel. Unlike the situation as to the 21.4-acre parcel, the 32.7-acre parcel is leased to Lee County as part of the 43.6- acre parcel. But in the December 17, 1993, agreement, the Department of Juvenile Justice, not Lee County, assumes responsibility for maintaining all improvements, which arguably includes drainage improvements. As between Ft. Myers and Lee County, Lee County assumes secondary liability for the maintenance of all improvements. But the failure of the Department of Juvenile Justice to do so would likely represent a default under the agreement. In such a case, the lease and separate agreement probably would either be in litigation or Lee County would have terminated its obligations under the contracts. In either case, it is unlikely that Lee County would perform its secondary responsibility to maintain the drainage improvements, especially where it is receiving no rent from the Department of Juvenile Justice and priority is given to Ft. Myers juveniles in admission decisions. Construction will precede operation as to the 10.9- acre parcel so the parties have an opportunity, even after the construction and operation permit is issued, to secure the necessary written consent before the operation permit goes into effect. But similar deficiencies exist with respect to the 10.9- acre parcel because the same agreement imposes upon the Department of Juvenile Justice, not Lee County, the obligation to maintain improvements. An additional complication arises as to the 10.9-acre parcel. The Department of Juvenile Justice intends to contract with one or more private entities to operate the bootcamp and halfway house, so there is at least one more party that Lee County could claim was responsible for maintenance of the surface water management system. The question of who is responsible for maintaining the surface water management systems is important. Drainage quantities and directions can change if swales clog up with vegetation or other matter. In this case, one roadside swale in the area of the 21.4-acre parcel is blocked with vegetation. DMS and SFWMD have thus failed to provide reasonable assurance that the designated entity has assumed responsibility for the maintenance and operation of the existing systems or will assume responsibility for the maintenance and operation of the proposed system following its construction. Permit for Existing Development Section 1.6, Basis of Review, states: [SFWMD] issues construction and operation permits for proposed surface water management activities and operation permits for existing systems. The criteria herein are specifically designed to apply to proposed activities (construction and operation permits). Therefore, some of the criteria may not be applicable to the permitting of existing systems (operation permits). For example, in some cases, existing systems may not meet flood protection criteria. Criteria deviation for existing systems will be identified in staff reports. SFWMD has produced no evidence explicating the extent to which existing systems, such as the systems on the 21.4- and 32.7-acre parcels, are entitled to operating permits without meeting some of the criteria applicable to proposed systems, such as the system on the 10.9-acre parcel. There is nothing whatsoever in the record to explain why certain existing systems might not have to meet certain criteria, such as flood protection criteria. Except for the quantity deviation discussed below, there is nothing in the record disclosing the extent to which SFWMD has waived, or even considered the applicability of, certain or all criteria prior to the issuance of operation permits for the existing systems. In practice, SFWMD does not adhere even to the vague standards implied in 1.6. According to the SFWMD witness, the practice of SFWMD, as reflected in this case as to the systems on the 21.4- and 32.7-acre parcels, is to permit existing systems "as is, where is," as long as they have had no reported problems. There are numerous deficiencies in the "as is, where is" unwritten policy, apart from the obvious one that it conflicts with the assurance of 1.6 that only "some of the criteria may not be applicable" to existing systems. First, the record does not define what a "problem" is. Second, the record discloses no means by which reported problems are collected and later accessed, such as by a parcel index. The "as is, where is" policy is an abdication of the limited responsibilities that SFWMD imposes upon itself in 1.6, especially when applied to the present facts. The facts are straightforward. Neither Ft. Myers, Lee County, nor any other party has ever obtained a permit for any surface water management system, despite numerous improvements in the past 20 years requiring such permits, including the construction of a heliport, at which maintenance and refueling of helicopters takes place. In two relatively minor cases, discussed below, SFWMD erroneously determined that no permit was required. In one of those cases, the applicant, Lee County, candidly admitted the existence of a flooding problem. Based on the present record, neither DMS nor SFWMD has justified the issuance of an operation permit for the systems on the 21.4- and 32.7-acre parcels based either on Basis of Review 1.6 or on the "as is, where is" unwritten policy. Construction of the five improvements on the 21.4 acres began between 1975 and December 1977 with construction of a portion of the Lee County Stockade building and parking, Emergency Operations Center building and parking, and a now- removed barn for the Lee County Sheriff's Office. At the same time, a lake was dug, probably for fill purposes. By the end of 1977, about 2.39 acres of the 21.4 acres were converted to impervious surface. From 1978 to March 1980, another 0.96 acres of the 21.4 acres were converted to impervious surface by the construction of a perimeter dike and road. During this period, construction commenced on the Juvenile Detention Center, adding another 1.63 acres of impervious surface. Between March 1980 and December 1981, additions were made to the Lee County Stockade building and the lake for an additional 0.45 acres of impervious area. Between December 1981 and March 1984, the Price Halfway House building and parking were constructed, adding another 0.79 acres of impervious surface. Between March 1984 and February 1986, a heliport facility and landing area were constructed for the Lee County Sheriff's Office, adding another 1.01 acres of impervious surface. Between February 1986 and February 1990, an additional 2.31 acres of impervious surface were added through additions to the Lee County Stockade and parking area, juvenile detention center, and Emergency Operations Center parking area. Between February 1990 and April 1993, another addition to the Lee County Stockade added 0.62 acres of impervious surface. An additional 0.17 acres of lake was excavated. During this time, applicable rules and statutes required permits for the construction of "works" affecting surface water, including ditches, culverts, and other construction that connects to, or draws water from, drains water into, or is placed in or across the waters in the state. The buildings, parking, other impervious surfaces, ditches, swales, dikes, lake excavations, and, at one point, addition of a now- abandoned pump all constituted "works" for which surface water management permits were required. In 1988, Lee County or Ft. Myers applied for an exemption for an addition to the Lee County Stockade. The basis for the claim of exemption was that the parcel consisted of less than 10 acres and the total impervious surface did not exceed two acres. Although rules in effect at the time required consideration of the contiguous 65 acres under common ownership and the total impervious surface for the 9.7-acre "parcel" exceeded two acres, SFWMD erroneously issued an exemption letter. The second instance involving a claim of exemption took place in 1989 when Lee County submitted plans for another addition to the Lee County Stockade, adding 0.51 acres of impervious surface. The submittal acknowledged a "flooding" problem, but promised a master drainage plan for the "entire site." SFWMD determined that no permit would be required due to the promise of a master drainage plan. No master drainage plan was ever prepared. The flooding problem precluded issuance of the operation permit on an "as is, where is" basis for the already-developed 21.4-acre parcel, even assuming that SFWMD adequately justified the use of this unwritten permitting procedure. In fact, SFWMD has not explained adequately its "as is, where is" permitting procedure or even the undelineated permitting criteria referenced in 1.6, Basis of Review. The 65- acre parcel is a poor candidate for preferential permitting of existing systems. The owner and developer constructed the existing systems in near total disregard of the law. The two times that the owner and developer complied with the permitting process involved small additions for which exemptions should not have been granted. In one case, SFWMD exempted the proposed activity due to its error calculating minimum thresholds as to the areas of the parcel and the impervious surface. In the other case, SFWMD exempted the proposed activity partly in reliance on a promised master drainage plan that was not later prepared. To issue operation permits for the existing systems on the 21.4- and 32.7-acre parcels would reward the owner and developer of the 65-acre parcel for noncompliance with the law and provide an incentive for similarly situated landowners and developers likewise to ignore the law. Before issuing operation permits on systems that have received no comprehensive review and that have been added piecemeal over the years, SFWMD must evaluate the surface water systems on the entire 65-acre parcel to determine whether they meet all applicable criteria. The "as is, where is" unwritten policy has no applicability where there have been reports of flooding. If SFWMD chooses to dispense with criteria in reliance upon Basis of Review 1.6, it must be prepared to identify and explain which criteria are waived and why. Water Quality Basis of Review 5.2.2 provides that projects that are zoned commercial or industrial, such as the present one, must provide one-half inch of "dry" detention or retention pretreatment, unless reasonable assurances are provided "that hazardous materials will not enter the project's surface water management system." There is no existing or proposed dry detention on the 65 acres. The existing development includes the Sheriff's Office Aviation Department, which serves as a heliport. The fueling and maintenance of helicopters means that contaminants may enter the stormwater draining off the site. The functioning of the surface water system on this site is therefore of particular importance. There also may be more reason to question the functioning of the surface water system on this site. It is south of the Lee County Stockade, where flooding has been reported. The heliport site has also been the subject of more elaborate drainage improvements, such as the location of a small retention pond near the Stockade boundary and a pump, the latter of which has since been abandoned. The existing system on the 21.4-acre parcel, as well as the existing and proposed systems on the remainder of the 65 acres, require dry pretreatment for reasons apart from the presence of the heliport. The materials likely to be used with the existing and proposed developments are similar to those found on residential sites. SFWMD and DMS contend that there is therefore no need to require dry pretreatment as to these areas. However, the existing and intended institutional uses, such as jails and bootcamps, represent an intensity of use that exceeds the use typical in areas zoned residential. This increased intensity implies the presence of typical residential contaminants, such as petroleum-based products or cleaning solvents, but in greater volumes or concentrations, if not also, in the case of solvents, different compositions. The lease addresses potential liability for released petroleum. In the absence of a showing that such hazardous materials are prevented from entering the runoff, SFWMD must require dry pretreatment for the systems occupying the entire 65-acre parcel. DMS and SFWMD have thus failed to provide reasonable assurance that the existing systems satisfy applicable water quality criteria or that the proposed system will satisfy applicable water quality criteria. Water Quantity The 65-acre parcel adjoins Ortiz Avenue on the west and property owned by Petitioners on the east and south that is undeveloped except for a borrow pit some distance from the 65- acre parcel. The parcel is roughly 1000 feet east- west and 2700 feet north-south. The proposed halfway house is at the north end of the parcel. The halfway house is situated between a proposed detention pond on the west and a recreation field on the east. A paved road divides the halfway house from the rest of the 65- acre parcel. South of the road are the Lee County Stockade on the west, which abuts Ortiz Avenue, and the Juvenile Detention Center on the east. A berm separates these two sites. The berm runs from the road along the west shore of the twice- enlarged 1.2- acre retention pond and the west boundary of the Price Halfway House, which is south of the Juvenile Detention Center. To the west of the berm, south of the Lee County Stockade, is the Sheriff's Office Aviation Department or heliport facility, which abuts Ortiz Avenue. South of the Aviation Department is an outparcel used by the Florida Department of Corrections that also abuts Ortiz Avenue. East of the outparcel is the proposed halfway house with a proposed detention pond west of the halfway house and south of the outparcel. The Emergency Operations Center, which abuts Ortiz Avenue, is south of the detention pond and surrounded on three sides by the 32.7 acres to be left undisturbed at this time. There are perimeter berms around all of the parcels except for the Juvenile Detention Center and Price Halfway House, which are served by a single berm, and the Emergency Operations Center, which appears not to be bermed. The prevailing natural drainage is not pronounced either by direction or volume because the land is nearly level. The natural direction of drainage is to the south and west and remains so on Petitioners' land to the east and south and the undisturbed 32.7 acres to the south. The variety of drainage directions within the remainder of the 65- acre parcel reflects the extent to which berms, swales, ponds, pumps, roads, buildings, parking areas, and other works have been added to the northerly parcels. Runoff reaching the northern boundary of the 65 acres will be diverted due west around the proposed detention pond to the swale running along the east side of Ortiz Avenue. Runoff from the recreation field and halfway house building and parking area drain into the proposed detention pond, which releases water through a gravity control device to the Ortiz Avenue swale. There appears to be a connection routing some runoff from the south side of the recreation field to the Juvenile Detention Center, where it travels west in a roadside swale to the Ortiz Avenue swale. A little less than half of the area of the Juvenile Detention Center site drains into perimeter swales along the north and east borders and then to the west before emptying into the Ortiz Avenue swale. The remainder of the Juvenile Detention Center drains into the retention pond. The same is true of the Price Halfway House. The Lee County Stockade drains to each of its borders where the water then runs west along the north or south border to the Ortiz Avenue swale. The southern half of the Lee County Stockade site drains into the small retention pond at the northwest corner of the Sheriff's Office Aviation Department. Most of the runoff from the heliport facility runs to the southwest corner of the parcel, which is the location of the abandoned pump. From there, the runoff continues to the Ortiz Avenue swale. Very little if any of the runoff from the heliport enters the small retention pond on the northwest corner of the parcel. The bootcamp drains into the detention pond, which then releases water by a gravity control structure into a portion of the undisturbed 32.7-acres before entering the Ortiz Avenue swale. The Emergency Operations Center site drains in all directions away from the building and parking area, eventually draining into the Ortiz Avenue swale. Stormwater discharge rates from the proposed halfway house and bootcamp are 0.28 cfs and 0.37 cfs. Under SFWMD rules, the allowable maximums in the Six Mile Cypress drainage basin are 0.30 cfs and 0.33 cfs, respectively. SFWMD and DMS contend that the excessive discharge from the bootcamp is acceptable because the gravity control device for the proposed detention pond is of the smallest size allowable, given the indisputable need to avoid clogging and ensuing upstream flooding. Initially, SFWMD approved the discharge rates for the halfway house and bootcamp because, when combined, they did not exceed the total allowable value. However, this approach was invalid for two reasons. First, the two sites contain entirely independent drainage systems separated by several hundred feet. Second, after correcting an initial understatement for the value for the halfway house, the actual total exceeds the maximum allowable total. SFWMD contends that the slight excess is acceptable because of the inability to use a smaller orifice in the gravity control structure. However, the discharge quantity easily could have been reduced by design alternatives, such as enlarging the detention pond, which is mostly surrounded by land that is to be left undisturbed. The ease with which the minimum-orifice problem could have been avoided rebuts the presumption contained in Basis of Review 7.2.A that excessive discharge quantities are presumably acceptable if due to the inability to use a smaller orifice. Also, SFWMD and DMS have failed to show that the effect of the excessive discharge quantities is negligible, so the exception in the SFWMD manual for negligible impacts is unavailable. Neither SFWMD nor DMS provided any reasonable assurance as to the quantity of discharge from the 21.4 acres. Rough estimates suggest it is more likely that the quantity of discharge may greatly exceed the allowable maximum. SFWMD must evaluate the water-quantity issues before issuing operation permits for the systems on the 21.4- and 32.7- acre parcels and a construction and operation permit for the 10.9-acre parcel. Obviously, if SFWMD determines that all water quantity criteria are met as to the existing systems, it may issue operation permits for the systems on the 21.4- and 32.7- acre parcels. Otherwise, SFWMD must quantify the extent of the deviation and, if it seeks to waive compliance with any or all quantity standards in reliance on Basis of Review 1.6, evaluate the effect of the waiver and explain the basis for the waiver. DMS and SFWMD have thus failed to provide reasonable assurance that the existing systems satisfy applicable water quantity criteria or that the proposed system will satisfy applicable water quantity criteria. Impacts on Adjacent Lands Petitioners' property is impacted by the above- described drainage in two ways. First, Petitioners' property abutting the east side of Ortiz Avenue, south of the 65 acres, is especially vulnerable to flooding because the Ortiz Avenue swale is not a V-notch, but a half-V. The closed side of the swale prevents the water from running onto Ortiz Avenue. The open side of swale abuts Petitioners' property, so, if the swale's capacity is exceeded, stormwater will be released onto Petitioners' land. Second, perimeter berming along the east side of the 10.9- and 21.4- acre parcels will impede flow off the part of Petitioners' property located to the east of the 65 acres. A swale between the proposed halfway house and the Juvenile Detention Center will receive runoff from a small portion of Petitioners' property to the east and mostly north of the 65 acres. But there is no indication how much runoff from Petitioners' property can be so accommodated, how much runoff is impeded by the existing berm along the east side of the Juvenile Detention Center and Price Halfway House, and how much runoff will be impeded by the addition of new berms along the east side of the proposed halfway house and bootcamp. Basis of Review 6.8 requires that swales and dikes allow the passage of drainage from off-site areas to downstream areas. Rule 40E-4.301(1)(b), Florida Administrative Code, requires that an applicant provide reasonable assurances that a surface water management system will not cause adverse water quality or quantity impacts on adjacent lands. Neither SFWMD nor DMS obtained topographical information for Petitioners' property, as required by the Basis of Review. Rough estimates suggest that the proposed project may require Petitioners' property to retain considerably more stormwater from the design storm event of 25 years, three days. DMS and SFWMD have thus failed to provide reasonable assurance that the proposed system would not have an adverse impact on Petitioners' upstream and downstream land.
Recommendation It is hereby RECOMMENDED that the South Florida Water Management District enter a final order denying the application of the Department of Management Services for all permits for the operation and construction and operation of surface water management systems on the 65-acre parcel. ENTERED on June 19, 1995, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on June 19, 1995. APPENDIX Rulings on Proposed Findings of Petitioners 1-18: adopted or adopted in substance. 19: rejected as subordinate. 20-21: adopted or adopted in substance. 22-24 (first sentence): rejected as irrelevant. 24 (remainder)-46: adopted or adopted in substance. 47-53: rejected as subordinate. 54-64 (first sentence): adopted or adopted in substance. 64 (second sentence)-66: rejected as subordinate. Rulings on Proposed Findings of Respondent SFWMD 1-10: adopted or adopted in substance. 11: rejected as unsupported by the appropriate weight of the evidence. 12: rejected as unnecessary. 13: adopted or adopted in substance. 14-15: rejected as subordinate. 16: rejected as unsupported by the appropriate weight of the evidence. 17 (except for last sentence): adopted or adopted in substance. 17 (last sentence): rejected as unsupported by the appropriate weight of the evidence. 18-32 (first sentence): rejected as unnecessary. 32 (remainder): rejected as unsupported by the appropriate weight of the evidence. 33: rejected as subordinate. 34: rejected as unsupported by the appropriate weight of the evidence, except that the proposed ponds are wet detention. 35 (first sentence): adopted or adopted in substance. 35 (remainder): rejected as unsupported by the appropriate weight of the evidence. 36-45: rejected as unnecessary. 46-47: rejected as unsupported by the appropriate weight of the evidence. 48-50 (second sentence): adopted or adopted in substance. 50 (remainder): rejected as unsupported by the appropriate weight of the evidence. 51-52, 55-57 (first sentence), and 58: adopted or adopted in substance, although insufficient water quality treatment. 53: adopted or adopted in substance. 54: rejected as unsupported by the appropriate weight of the evidence. 57 (second sentence): rejected as unsupported by the appropriate weight of the evidence. 59: rejected as unsupported by the appropriate weight of the evidence. 60: adopted or adopted in substance, except after "therefore." None of remainder logically follows from what is said in 1.6. 61: rejected as unsupported by the appropriate weight of the evidence. 62-64: rejected as subordinate, unsupported by the appropriate weight of the evidence, and irrelevant. 65: rejected as subordinate. 66: rejected as irrelevant. The burden is on the applicant and SFWMD, if it wishes to issue the permits, to provide reasonable assurances as to the adverse impact of the drainage systems. 67-68: rejected as subordinate. 69: rejected as unsupported by the appropriate weight of the evidence. 70: rejected as unsupported by the appropriate weight of the evidence. 71: rejected as repetitious. 72: rejected as irrelevant, except for past report of flooding, which is rejected as repetitious. 73: rejected as repetitious. 74: rejected as irrelevant and subordinate. 75 (first three sentences): adopted or adopted in substance. 75 (remainder): rejected as unsupported by the appropriate weight of the evidence. 1 and 2: rejected as irrelevant insofar as the same result is reached with or without the permit modifications. Rulings on Proposed Findings of Respondent DMS 1-4: adopted or adopted in substance. 5: rejected as subordinate. 6: rejected as unsupported by the appropriate weight of the evidence. 7: adopted or adopted in substance. 8: rejected as subordinate. 9: adopted or adopted in substance, except that the excessive discharge was not "caused" by the minimum-sized orifice, only defended on that basis. 10: adopted or adopted in substance. 11-12: rejected as subordinate. 13: rejected as irrelevant. 14: adopted or adopted in substance. 15: adopted or adopted in substance, except for implication that no flooding problems existed. 16: rejected as recitation of evidence. 17: rejected as subordinate. 18: rejected as irrelevant. 19: adopted or adopted in substance, to the extent that separateness of systems is relevant. 20: rejected as subordinate. 21: adopted or adopted in substance, except for last sentence, which is rejected as unsupported by the appropriate weight of the evidence. 22: rejected as subordinate. 23-30: rejected as unsupported by the appropriate weight of the evidence, recitation of evidence, and subordinate. 31: rejected as unsupported by the appropriate weight of the evidence. 32: rejected as unsupported by the appropriate weight of the evidence, based on the present record. 33: rejected as unsupported by the appropriate weight of the evidence and relevance. COPIES FURNISHED: Tilford C. Creel Executive Director South Florida Water Management District P. O. Box 24680 West Palm Beach, FL 33416 Russell P. Schropp Harold N. Hume, Jr. Henderson Franklin P.O. Box 280 Ft. Myers, Fl 33902 O. Earl Black, Jr. Stephen S. Mathues Department of Management Services 4050 Esplanade Way, Suite 260 Tallahassee, FL 32399-0950 Vincent J. Chen Toni M. Leidy South Florida Water Management District 3301 Gun Club Road West Palm Beach, FL 33401
Findings Of Fact At all times to the issues herein the Department of Environmental Protection was the state agency in Florida responsible for the regulation of water pollution and the issuance of dredge and fill permits in the specified waters of this state. Mr. Byrd has been a resident of the City of Treasure Island, Florida for many years and resides at 123 123rd Avenue in that city. His property is located on Boca Ciega Bay next to a public boat ramp operated by the City. On April 12, 1995, the City of Treasure Island applied to the Department of Environmental Protection for a permit to construct a dock six feet wide by seventy-five feet long, located on the edge of its property on which the public boat ramp is located. This property is located in a basin off Boca Ciega Bay, which is classified as a Class III Outstanding Florida Water. The dock involves the placement of pilings in the water, and the construction of a walkway thereon. In order to be obtain a permit, the applicant must provide the Department with reasonable assurances that the proposed project will not degrade water quality and will be in the public interest. The project is permanent in nature, but the temporary concerns raised by construction have been properly addressed in the permit. In the instant case, the dock is intended to accommodate the boating public which will utilize it to more safely launch, board, debark, and recover small boats at the ramp in issue. The dock will be equipped with a hand rail which will increase the safety of the project. Evidence establishes that without the dock, boaters have to enter the water to launch and recover their boats on a ramp can be slippery and dangerous. The site currently in use as a boat ramp, a part of which will be used for the dock, is almost totally free of any wildlife. No evidence could be seen of any sea grasses or marine life such as oysters, and there was no indication the proposed site is a marine habitat. Manatees do periodically inhabit the area, and warning signs would be required to require construction be stopped when manatee are in the area. The water depth in the immediate area and the width of the waterway is such that navigation would not be adversely impacted by the dock construction, nor is there any indication that water flow would be impeded. No adverse effect to significant historical or archaeological resources would occur and taken together, it is found that the applicant has provided reasonable assurances that the project is within the public interest. Concerning the issue of water quality, the applicant has proposed the use of turbidity curtains during construction which would provide reasonable assurances that water quality would not be degraded by or during construction. The water depths in the area are such that propeller dredging and turbidity associated therewith should not be a problem. No evidence was presented or, apparently is on file, to indicate any documented water quality violations at the site, and it is unlikely that water quality standards will be violated by the construction and operation of the structure. The best evidence available indicates there would be no significant cumulative impacts from this project. Impacts from presently existing similar projects and projects reasonably expected in the future, do not, when combined with the instant project, raise the possibility of adverse cumulative degradation of water quality or other factors of concern. By the same token, it is found that secondary impacts resulting from the construction of the project would be minimal. It is also found that this project is eligible for an exemption from the requirements to obtain a permit because of the Department's implementation on October 3, 1995 of new rules relating to environmental resources. However, the City has agreed to follow through with the permitting process notwithstanding the exemption and to accept the permit including all included conditions. This affords far more protection to the environment than would be provided if the conditions to the permit, now applicable to this project, were avoided under a reliance on the exemption to which the City is entitled under current rules. To be sure, evidence presented by Mr. Byrd clearly establishes the operation of the existing boat ramp creates noise, fumes, diminished water conditions and an atmosphere which is annoying, discomfiting, and unpleasant to him and to some of his neighbors who experience the same conditions. Many of the people using the facility openly use foul language and demonstrate a total lack of respect for others. Many of these people also show no respect for the property of others by parking on private property and contaminating the surrounding area with trash and other discardables. It may well be that the presently existing conditions so described were not contemplated when the ramp was built some twenty years ago. An increase in population using water craft, and the development and proliferation of alternative watercraft, such as the personal watercraft, (Ski-Doo), as well as an apparent decline in personal relations skills have magnified the noise and the problem of fumes and considerably. It is not likely, however, that these conditions, most of which do not relate to water quality standards and the other pertinent considerations involved here, will be increased or affected in any way by the construction of the dock in issue.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of Environmental Protection issue to the city the requested permit to construct the dock in issue at the existing public boat ramp at the east end of 123rd Avenue right of way in the City of Treasure Island. RECOMMENDED this 12th day of December, 1995, in Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of December, 1995. COPIES FURNISHED: Ronald Schnell, Esquire 3535 First Avenue North St. Petersburg, Florida 33713 James W. Denhardt, Esquire 2700 First Avenue North St. Petersburg, Florida 33713 Christine C. Stretesky, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virginia B. Wetherell Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kenneth Plante General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
The Issue Whether Southern Hy Power Corporation (Hy Power) has provided reasonable assurance, based on plans, test results, or other information, that its proposed hydroelectric facility will comply with the Management and Storage of Surface Water (MSSW) statutes and rules of Southwest Florida Water Management District (SWFWMD) and the Wetland Resource Management permit (WRM)/water quality certification statutes and rules of the Florida Department of Environmental Protection (DEP).
Findings Of Fact By Joint Prehearing Stipulation the parties agreed to the following description of the parties and the project: PARTIES: The Department of Environmental Protection (the Department) is a government agency in the State of Florida existing by virtue of Section 20.255, Florida Statutes, and operating pursuant to Chapters 253, 373, 376, and 403, Florida Statutes, and Title 62, Florida Administrative Code. Under an interagency agreement with SWFWMD, the Department also implements Title 40D, Florida Administrative Code. The Department is located in Tallahassee, Florida, and it has a district office in Tampa, Florida, which district includes Levy County. Southern Hy Power Corporation is a Florida Corporation whose principal offices are located at 7008 Southwest 30th Way in Gainesville, Florida. Betty Berger is an interested party with a mailing address of Post Office Box 83, Inglis, Florida. The Campbells are an interested party with a mailing address of 245 Palm Street, Inglis, Florida. Hy Power applied on August 31, 1993, to the Department for a WRM permit/water quality certification to construct a hydroelectric facility on the Inglis By-Pass Channel. The project is located in Section 12, Township 17 South, Range 16 East, within the town of Inglis in Levy County. The facility consists of a powerhouse located on the south side of the channel measuring about 28 feet wide by 115 feet long, drawing water from the Inglis By-Pass Channel, passing it through a single-pit type turbine and discharging downstream of the Inglis By-Pass Spillway Dam. Hy Power applied on August 4, 1998, to the Department for a MSSW permit for the same proposed hydroelectric facility on the Inglis By-Pass Channel. DESCRIPTION OF PROPOSED PROJECT The project involves the construction of an intake structure, powerhouse, and tailrace on a 0.61-acre area located on the south side of the existing Inglis By-Pass Spillway. The facility will take advantage of the existing hydrostatic head that exists on either side of the Spillway Dam, to generate electricity. The powerhouse will be constructed below grade and will contain a single megawatt turbine and generating unit. The intake structure will divert flows from the upstream side of the Spillway Dam through the powerhouse and back into the By-Pass Channel. A small one-story control building and low profile substation will be constructed above grade within the boundaries of the project area. The hydroelectric project is considered to be a "Run of the River" type of facility because it can only use that water which flows down the existing channel. The geometry of the channel restricts flow to a certain amount, therefore the project cannot create or use flows above those that the By-Pass Channel can provide. The overall authority for control of water levels in Lake Rousseau and flow to the lower Withlacoochee River will remain with the DEP. Lake Rousseau was created in 1909 when the Inglis Dam was constructed across the Withlachoochee River for the purposes of hydroelectric generation. The dam impounds over 11 miles of the Withlachoochee River and forms a lake approximately 3,000 to 4,000 acres in size. Prior to construction of the Barge Canal, water released from the Inglis Dam would flow down the lower portion of the Withlachoochee River about 10 miles before entering into the Gulf of Mexico. In the mid to late 1960's the Army Corps of Engineers (ACOE) built a portion of the Cross Florida Barge Canal between the Gulf of Mexico and Lake Rousseau. The canal severed the Withlachoochee River downstream of the Inglis Dam causing its flow to be diverted into the Barge Canal and then into the Gulf. In order to maintain the flow of freshwater from Lake Rousseau to the lower segment of the River, the 8,900-foot long Inglis By- Pass Channel and Spillway were constructed. The resulting downstream flow ensures navigation in the lower portion of the River and sustains its freshwater and estuarine environment. The water level in Lake Rousseau is generally maintained at an elevation of 27.5 feet above mean sea level (msl) by a combination of the Inglis Dam, the Inglis Lock, which is located in the Barge Canal, and the By-Pass Channel Spillway. These water control features are known collectively as the Inglis Project Works. The water levels in the lower Withlachoochee River immediately to the west of the By-Pass spillway are close to sea level. The resulting head provides the potential energy needed to drive the proposed generator turbine. Under normal conditions the majority of water released from Lake Rousseau flows over the Spillway Dam into the lower segment of the River. According to the DEP Office of Greenways and Trails (OGT), the maximum capacity of the existing By-Pass Channel Spillway is 1,540 cubic feet per second. The hydroelectric project will divert whatever flow is allowed around the existing spillway through the turbine and back into the channel. When the Cross Florida Barge Canal project was cancelled in the 1990's, the ACOE transferred ownership of the property to the State of Florida Board of Trustees, who in turn has leased the property to the DEP for use as the Cross Florida Greenbelt State Recreation and Conservation Area. Management of this property, the control of river flow and lake levels, and operation of the Inglis Project Works are exercised by the DEP's OGT. The OGT utilizes a document entitled "Water Control Plan for Inglis Project Works," dated September 1994, as a guide to operating the structures. The Water Control Plan is incorporated as part of the MSSW intent to issue. On or about April 25, 1995, the Governor and Cabinet, sitting as the Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), approved a request from Hy Power to sublease 0.61 acres of Greenway property at the project site for the purpose of providing electric power. The request was challenged by Berger and the Campbells, and resulted in an administrative hearing held on November 3, 1995. As a result of the hearing, Administrative Law Judge Larry Sartin entered a Recommended Order on July 12, 1996, that the Board enter an order approving execution by the DEP of the proposed sublease and dismissing the petition of Berger and the Campbells. The Recommended Order was approved by the Trustees in its entirety in a Final Order dated April 12, 1996 ("Final Order"). Berger v. Southern Hy Power Corporation et al., Case No. 95-3589. A copy of the Final Order is listed as an exhibit to this Stipulation, and the Findings of Fact and Conclusions of Law contained therein are adopted herein. As previously ruled by the undersigned, the previous Final Order is res judicata as to Petitioners in this case, who are collaterally estopped from challenging any of the findings of fact or conclusions of law contained in the previous Final Order. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Final Order with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the Findings of Fact or Conclusions of Law in the Final Order. On February 21, 1995, Hy Power filed application with the Federal Energy Regulatory Commission (FERC) for a conduit exemption from the licensing requirements of Part I of the Federal Powers Act (FPA) for the proposed project. Petitioners and various other persons filed protests with FERC in opposition to the project. On April 21, 1997, FERC issued an Order Granting Conduit Exemption, a copy of which is listed as an exhibit to this Stipulation. Petitioners in this case are collaterally estopped from challenging any of the findings or conclusions contained in that Order Granting Conduit Exemption. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Order Granting Conduit Exemption with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the findings or conclusions in the Order Granting Conduit Exemption. FACTS ADDUCED AT HEARING OUTLINE OF PROJECT The proposed project calls for the construction of a water retention structure along the existing By-Pass spillway, the excavation of a large hole in which the powerhouse and turbine would be constructed "in-the-dry" south of the existing dam, and a millrace below the proposed project to return the water back into the existing water course. Conflicting testimony was received regarding the facts surrounding the construction of the project. These included: whether the proposed project will touch the existing wing walls of the existing dam; whether the water retention structure is a coffer dam; whether the proposed water retention structure will safely retain the water; whether the powerhouse and turbine have sufficient negative buoyancy to stay in the ground; whether the proposed excavation will weaken the existing dam; and whether the de-watering of the excavation site will adversely impact ground and surface water. PROJECT DESIGN AND ENGINEERING Engineering for the project was directed by witness Richard A. Volkin, a professional engineer and president and CEO of Engineering Company, Inc., based in Canton, Massachusetts. Mr. Volkin has extensive national and international experience in the design, management, and operation of hydroelectric facilities. Other engineers in Mr. Volkin’s firm worked on the project under Mr. Volkin’s direct supervision, including John May, who became registered as a professional engineer in Florida in order to sign and seal the engineering drawings for the project, which he initially did around 1994. Mr. May became ill and retired in 1998. Because of the length of time the application process has taken and the fact that Mr. May retired, there was a time while the application was pending, when Hy Power's design team was without a registered Florida engineer. When this was brought to the attention of Hy Power, Hy Power substituted Steven Crockett for Mr. May as the Florida-registered professional engineer of record for the project. DEP routinely accepts an applicant’s changing its engineer of record during the course of permit application or construction. Mr. Crockett is a civil and structural engineer who has considerable experience in preparing dam structural designs. Mr. Crockett independently reviewed and evaluated the engineering drawings for the project. Mr. Crockett resealed the drawings by using his drawn seal and signing the plans because his embossed seal was not readily available and time was of the essence. Mr. Crockett has advised DEP that he is now engineer of record for the project, using the appropriate DEP forms. Mr. Volkin’s firm performed all of the studies required by the various agencies, including a geotechnical study of the area, a 50-year analysis of water flow in and out of the Lake Rousseau regime, and water quality evaluations of water in the By-Pass Channel. The ACOE performed deep hole borings of the soils (approximately 36-40 feet below sea level) in the area of the project site to determine soil stabilization conditions at the site when they were constructing the Inglis Project Works. The soil conditions found can reasonably be expected to be similar today. Mr. Volkin’s company also took its own eight-foot deep surface core samples. The purpose of those samples was to verify the ACOE data. The new core samples verified the original core samples. Mr. Volkin also reviewed the ACOE’s engineering drawings developed from construction of the Spillway Dam. These show that the dam is founded on limestone bedding that has been stabilized with concrete. The hydroelectric facility will be constructed adjacent to and south of the dam structure and adjacent to and north of the barge canal. The same type of limestone bedrock is found in the area of the proposed construction. The facility design includes an intake channel on the upstream channel and a tailrace downstream. Those are the only structures that will be constructed next to the By-Pass Channel. The construction of the facility itself will be "in the dry." Hy Power will use coffer dams to seal off the construction site from the By-Pass Channel, so that there will not be water leakage from the Channel into the construction site. Water from the By-Pass Channel will enter the power plant when the coffer dams are lifted and the water is allowed to flow into the facility. The Petitioners presented the testimony of Bill Edwards, an individual with considerable experience in the construction of bridges, cofferdams, and similar concrete structures in aquatic and semi-aquatic conditions. Mr. Edwards is a former hard-hat diver who worked all over the world and worked in Florida for many years prior to his retirement. Based upon his experience and expertise in construction related to projects of this type, his testimony is credible and worthy of consideration. Mr. Edwards pointed out that if the proposed water retention structure did not touch the wing wall of the existing dam, it could not keep the water out and would not have the strength that it needed to retain the water. Hy Power’s witnesses explained that the retention structure would be set close enough to the existing wing wall that waterproofing materials could be placed between the two structures to keep the water out. Further, that the existing plans did not show interior bracing which would be included for structural strength and integrity. In sum, the retention structure will be in contact with existing dam’s wing wall, but will be free standing and not dependent upon the strength of the wing wall for its strength. Mr. Edwards pointed out that a cofferdam by definition has walls on all sides of the structure. The structure proposed by Hy Power did not have walls all the way around the proposed excavation. In rebuttal, Hy Power presented evidence that its plans were conceptual, design drawing and not construction plans. Hy Power represented that in actuality it would put as many walls as were necessary to keep the water out of the hole it intended to excavate. Trash racks will be constructed at the intake structures to protect aquatic life and make sure that trash and vegetation do not enter the intake structure or go down river. The trash rack bars will be two inches on center, which the U.S. Fish and Wildlife Service has determined as the appropriate size for the protection of fish. The turbine blades are "double regulated," and operate generally between 60 and 90 revolutions per minute. The design enables the turbine to operate at a constant speed to generate a consistent flow of electricity, notwithstanding the fact that the flow of the water may vary. The blade speed is not very fast, and the 2.5-meter blades provide a two to three-foot opening. This design acts to prevent fish mortality. There are four ways to shut off the flow of water through the proposed structure: close the pitch of the blades, close the wicket gates, allow the counter balance to the wicket gates to kick in and automatically close the gates, and close off the main gates. This is a fail safe system ("four level redundancy") designed to work upon any failure. Once water goes through the generator, its velocity is reduced to no greater than its intake rate which is a maximum of three feet per second. This prevents the water being discharged from the tailrace from causing erosion. If the head of water in the dam produces a flow exceeding three feet per second, it can be diverted over the other dams which will be functional. The power plant will be encased in concrete, except for a small access way that enables a person to go down a set of stairs to the plant. It will be a sealed, waterproof structure, as required by FERC and the ACOE. This will prevent penetration of groundwater, or flood waters in the event a massive flood overtops the plant. The only water entering the powerhouse will be through the turbine tunnel for power generation purposes. Mr. Edwards pointed out that the powerhouse was a closed structure and as such would have positive buoyancy, that is, it would float. Mr. Edwards pointed out that the proposed site is between the barge canal and By-Pass spillway and there is a great deal of groundwater and potentiometric pressure in the existing water table. In sum, there is a unlimited supply of groundwater at the site, and powerhouse could float out of the ground just like an empty swimming pool. Hy Power presented rebuttal evidence that the weight of the building, the turbine, and the water flowing through the turbine would be close to negative buoyancy, and they would add additional weight to the structure as necessary to keep it in place. The project is designed to generate three megawatts of electric power which is enough electricity to serve between 300 and 3000 homes, depending on usage. The project is designed to be unmanned. This is common for facilities such as this. The plant can be operated by remote control, unlike the existing controls at the By-Pass Dam, which are operated manually. DEP can access, monitor, and control remotely the generator's operation to include shutting the facility down at any time. There will be remote sensors to monitor water elevations. Flood protection will improve because of the ability of DEP to manage water flow from a remote location. If there is any major disruption, the plant will shut itself down. The project is classified as "green power." In other words, it generates natural energy without any disruption to the environment. The project will have minimal to no impact on the environment. There will be no significant changes in water quality compared to existing conditions as a result of either construction or operation of the facility. WRM Permit Criteria Hy Power has provided reasonable assurances that the proposed project will not cause a violation of state water quality standards of Section 403.918(a), Florida Statutes (1991). The parties stipulated that turbidity and dissolved oxygen were the two surface water quality issues of concern in this proceeding. The receiving water body is the Inglis By-Pass Channel. The Inglis By-Pass Channel is a Class III surface water. The project is not located in a OFW. While the lower Withlacoochee River is an OFW, the OFW designation runs up the natural river itself, and does not include the Spillway Dam, tailrace, or the remainder of the By-Pass Channel. There would be no degradation of water quality at the point of contact with the Withlacoochee River OFW. The DEP and FERC looked specifically at potential for turbidity and dissolved oxygen in determining whether the project would violate state water quality standards. The standards for turbidity and dissolved oxygen will not be violated. Because the By-Pass Dam is an under flow structure, a minimum of oxygenation currently occurs as water flows through the existing dam. The proposed project runs the water underground through the generator; however, Hy Power will measure the dissolved oxygen below the dam in the Lower Withlacoochee River. In the event there is any lowering of dissolved oxygen, Hy Power can install a "sparge ring" to reoxygenate the water going through the turbine so that dissolved oxygen remains at current levels. No turbidity will be added to the receiving water as a result of the project, because water velocity is low and the structure is encased in concrete and rip-rap. The only other potential for turbidity would occur when the coffer dams are removed after construction is complete. The coffer dams can be removed with the generator closed to permit any turbidity to settle. The amount of siltation that might occur when the generator is opened would be insignificant. Where a project is not in a OFW, an applicant must provide reasonable assurance that the project will not be contrary to public interest. See Section 403.918(2), Florida Statutes (1991). Hy Power has provided such assurances. The project will not directly affect public health, safety or welfare, or the property of others. See Section 403.918 (2)(a)1., Florida Statutes. There are concerns relating to the structural integrity of the proposed facility and adjacent structures which are discussed extensively below. The project will have no adverse impact upon the conservation of fish and wildlife, including threatened and endangered species and their habitat. See Section 403.918 (2)(a)2., Florida Statutes. While manatees are not likely to be found at the project site, the installation of the trash racks will eliminate any potential adverse impact on manatees. In fact, the racks will be an improvement over the current unprotected Spillway Dam. DEP procedures require a specific manatee control plan be implemented to deal with site specific concerns. The project will not adversely affect navigation or the flow of the water or cause harmful erosion or shoaling. See Section 403.918(2)(a)3., Florida Statutes. The project will not adversely affect fishing or recreation values or marine productivity in the vicinity of the project. See Section 403.918(2)(a)4., Florida Statutes. The permanent project and its construction will cause no significant environmental impacts. See Section 403.918(2)(a)5., Florida Statutes. There will be no adverse impacts to significant historical and archeological resources. Section 403.918(2)(a)6., Florida Statutes. With regard to the impact on current conditions and relative value of functions being performed by the areas affected by the proposed activity, there will be no negative impacts. See Section 403.918(2)(a)7., Florida Statutes. Improvement will result from better control of water flow at the project site, installation of trash racks and implementation of green power. THE FORESEEABLE ADVERSE SECONDARY OR CUMULATIVE IMPACTS Potential adverse secondary impacts related to power transmission are addressed through the fact that there is an existing power line corridor that can be used to transmit the electricity. Any need to change the corridor could be addressed by subsequent DEP permitting. Cumulative impacts are not at issue. Mr. Gammon, with Florida Power, acknowledged that the current electric company, presumably Florida Power, would be required by FERC to transport the electricity generated by Hy Power over its existing corridor and poles. No final decision has been made regarding how to access the site with equipment during construction. Several feasible construction options exist, and there are several ways of accessing the site with heavy equipment vehicles and without impacting wetlands. Any final decision would be subject to DEP approval. Since the project meets the public interest criteria of Section 403.918(2)(a), Florida Statutes, and wetland impacts are minimal, the project is permittable without the need for mitigation. See Section 403.918(2)(b), Florida Statutes. The ACOE has issued a permit for the facility. The permit varies slightly from the DEP intent to issue in the use of reinforced concrete rather than rip-rap on the bottom half of the intake channel. This is to comply with ACOE preference, but the variation has only an environmental benefit. Counsel for Petitioners sought to elicit testimony from Linda Sloan, Executive Director of the Withlacoochee Regional Planning Council, with regard to compliance of the proposed project with the Town of Inglis Comprehensive Plan and Land Development Code. Such compliance is not relevant to this proceeding. At any rate, Ms. Sloan conceded that any prohibition that might apply in the Land Development Code to construction of the proposed facility could potentially be alleviated by exemption or variance provisions in the Code. MSSW PERMIT CRITERIA The project will provide adequate flood protection and drainage in the conventional sense. See Rule 40D-4.301(1)(a), Florida Administrative Code. Because the amount of impervious area is minimal, runoff from the project will not in any way contribute to increased flooding or adversely impact drainage patterns. The total amount of impervious area of the facility is less than that of a single-family residence. SWFWMD rules do not even require MSSW permits for single-family residences because the impact is not significant. The only purpose for requiring a MSSW permit for the project is to review the project’s potential downstream impacts to the watershed, not stormwater runoff from the facility itself. The project will not cause adverse water quality or water quantity impacts on adjacent lands in violation of Chapter 373, Florida Statutes, or cause a discharge that violates state water quality standards. See Rule 40 D-4.301(1)(b), Florida Administrative Code. As indicated by the WRM water quality findings above, the project will not generally violate state surface water quality standards. See Rule 40 D-4.301(1)( c), Florida Administrative Code. The project will not generally cause adverse impact on surface or groundwater levels or flows. See Rule 40 D- 4.301(1)(d), Florida Administrative Code. Since the project is a run-of-the-river, it will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it under Chapter 40D-8, Florida Administrative Code. The project will not cause adverse environmental impacts, or adverse impacts to wetlands, fish, and wildlife or other natural resources. The project can be effectively operated and maintained. See Rule 40D-4.301(1)(g), Florida Administrative Code. The project is a slow speed, low maintenance facility. The design concept is well established and has been successfully used for many years. Possible adverse affects to public safety are discussed below. The project is consistent with the requirements of other public agencies. See Rule 40D-4.301(1)(i), Florida Administrative Code. Potential harm to water resources within the SWFWMD are discussed below. See Rule 40D-4.301(1)(j), Florida Administrative Code. The proposed project generally will not interfere with the legal rights of others. See Rule 40D-4.301(1)(k), Florida Administrative Code. The proposed project is not against public policy. See Rule 40D-4.301(1)(l), Florida Administrative Code. The project complies with the requirements contained in the Basis of Review. See Rule 40D-4.301(2), Florida Administrative Code. There is a dispute as to whether the project was within or at the edge of the 100-year flood plain. This dispute is related to how one interprets the rule as it relates to the millrace and the location of the facility which is under ground. In the conventional sense, the project is not in the flood plain. Further, the project is designed in such a way, that it is waterproof if it were topped with water. While in the past SWFWMD may have had concerns that the project might cause downstream flooding, SWFWMD currently has no such concerns, given the run-of-the-river status of the proposed project. The operation of the project will not cause downstream flooding. The DEP included in its intent to issue, conditions contained in the sublease between Hy Power and the DEP in order to ensure that the facility would remain run-of-the-river, would comply with the water control plan, and would otherwise comply with the terms of the sublease. The DEP has final control over water flow and can revoke the permit or otherwise take enforcement action against Hy Power if Hy Power fails to comply with the water control plan. GROUNDWATER IMPACTS Operation of the project will not cause groundwater contamination or otherwise have adverse groundwater impacts. Some concerns about groundwater during excavation of the construction site were raised. The conflicting evidence received regarding them is discussed below. An area of concern was the de-watering plan for the project. Everyone agrees there will be some water seepage into the construction site that will have to be pumped out. The parties disagree regarding the amount of water that will have to be removed. Their estimates of amount of water to be removed vary because their estimates of size and over-all depth of the site vary. Petitioners presented credible evidence that a potential exists for the construction site to have a large quantity of water because of its location between two sources of surface water (the By-Pass Channel and Barge Canal), because of the makeup of the subsurface, and because of the depth of the construction. Hy Power credibly represents that if excessive groundwater is found, it can address the adverse impacts through its de-watering plan that would have to be filed with FERC and DEP. The technology exists to address the de-watering of the project. Such plans are routinely considered by DEP after a construction permit is issued and before de-watering occurs. There is very little evidence of sinkhole activity in the project area, and the construction activities are not expected to cause any sinkhole activity. NOISE POLLUTION Mr. Bitter expressed concerns that FERC would require the facility to install a very loud siren that would result in sudden noise adverse to the well-being of neighbors. Mr. Bitter is unfamiliar with FERC siren requirements at run-of the-river hydroelectric facilities. In contrast, Mr. Volkin, who has substantial experience in this area, testified that the only alarm device that would be required would be for the protection of the workers during construction. The purpose of the alarm is to warn persons below a dam spillway of a change in the volume of water being let out of the impoundment. In the case of a run-of-the-river facility, the volume is near constant, changing only gradually. Therefore, even if a warning siren had to be installed its use would be limited to significant changes in flow or testing. This would not constitute a nuisance. Further, the facility is located in the vicinity of the Crystal River Nuclear Power Plant which has its own warning sirens. It would be prudent to make any warning devices required for this structure significantly different from those at the nuclear plant and to limit their use. DAM SAFETY AND FERC REVIEW In reviewing whether Hy Power’s applications complied with the relevant permitting criteria, the DEP took into consideration the review of the facility already performed by FERC. FERC will also be responsible for reviewing the project as it is being constructed. Mr. Edwards also raised concerns about the structural stability of the By-Pass Dam itself. This has been a subject of concern by those responsible for the dam, and a survey of the structure was conducted in 1993, referred to as the Greiner Report. The Greiner Report identified specific maintenance problems that have been and are being addressed by the DEP. However, DEP’s maintenance plan does not address specifically the possibility that the weight of the dam over time has caused some shifting in the dam. Hy Power has only a few core borings and only one at the location of the generator. Hy Power is using the ACOE’s original borings, as confirmed by several new ones, to develop its preliminary plans. The DEP considered FERC and the ACOE as responsible agencies for determining the structural integrity of the dam. DEP has taken FERC’s review of this facility into consideration as part of DEP’s own permitting review. It is normal for DEP to rely on outside sources and agencies for assistance in determining compliance with DEP permitting criteria such as public health and safety, and it is reasonable for DEP to do so in this instance. Most states do not have the full capability to evaluate dam safety, and so they rely on FERC and ACOE. On April 21, 1997, the project received a conduit exemption from FERC. The application process is illustrated in Hy Power Exhibit 11. Hy Power submitted to DEP detailed information about the dam, the associated structures and the proposed project which had been reviewed by FERC and the ACOE, the two agencies in the United States who are responsible for dam structure design, control, and administration. Included in the package was the Greiner Report and Hy Power’s review of it. FERC evaluated the project, the Inglis By-Pass Dam structure, and the proximity of the project to the Dam in relation to structural impact, upstream and downstream impacts, water quality, and environmental issues. Mr. Edwards raised concerns regarding the ability of the limestone bedrock to sustain additional construction in the area of proposed construction. This is a material issue in the controversy which impacts several aspects of the proposed construction. Mr. Edwards pointed out that the barge canal channel was constructed with the use of explosives that caused a fracturing of limestone bedrock. He pointed out that the steel panels, which Hy Power proposes to drive into the bedrock to construct the water retention structure necessary to excavate the hole into which the turbine and powerhouse would be placed, will further fracture this bedrock. This creates two potential dangers. It could permit water to move under and around the bottoms of the panels, potentially scouring the loosened material from the base of the panels and making them unstable and subject to failure. It could weaken the entire southern wing of the existing spillway dam. Mr. Edwards opined that this could result in catastrophic failure of the dam or the coffer dam. Such a failure would cause major destruction and loss of life to those persons living and working in and along the lower Withlacoochee River. Hy Power presented rebuttal evidence that it could and would, if necessary, inject concrete into the limestone to stabilize it and avoid the concerns raised by Mr. Edwards. FERC specifically evaluated concerns raised by project opponents over the poor physical condition of the By-Pass Channel Spillway structures, relying particularly on the 1993 Greiner Report. FERC noted that the DEP had entered into a contract to correct any deficiencies listed in the Greiner Report, which "did not conclude that the deficiencies at the By-Pass Spillway threaten downstream life and property." The FERC review concluded that the dam was safe. To ensure safety, FERC is requiring that Hy Power do a complete stability analysis of the dam prior to any construction. Articles 301 and 302 of the FERC exemption ensure that all final drawings and specifications be submitted to FERC prior to construction, along with a supporting design report consistent with FERC’s Engineering Guidelines; that FERC can require changes to assure a safe and adequate project; and that Hy Power must also submit approved coffer dam construction drawings and specifications at least 30 days prior to starting construction. FERC has its own engineering staff who will go to the site and do their own analysis, along with the ACOE, of the dam and structures, prior to any construction commencing. This is a detailed design review evaluation so that the latest information on the dam will be made known immediately prior to construction, and will prevent any catastrophic event from happening. Under FERC procedures, FERC requires the applicant to obtain the DEP permits prior to requiring applicant to submit more detailed construction designs for FERC's consideration. These more detailed designs in turn will be subject to further review by DEP and FERC. It is assumed that Hy Power will comply with the post- permitting procedures and requirements, and will present complete, detailed construction drawings for FREC and DEP approval. Hy Power’s failure to complete the process would result in denial of a construction permit.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the DEP enter a Final Order that issues the two permits challenged in this proceedings, WRM Permit No. 38-237096-3.001 and MSSW Permit No. 38-0129249-002, subject to the conditions contained in the Intents to Issue in the respective WRM and MSSW Permits and as described in the Recommended Order. DONE AND ENTERED this 2nd day of March, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2000. COPIES FURNISHED: Daniel H. Thompson, Esquire Berger Davis & Singerman 215 South Monroe Street, Suite 705 Tallahassee, Florida 32301 Andrew Zodrow, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John S. Clardy, III, Esquire Crider Law Firm Plantation Point 521 West Fort Island Trail, Suite A Crystal River, Florida 34429 Teri Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bernard M. Campbell Bessie H. Campbell 245 Palm Street Post Office Box 159 Inglis, Florida 34449 Sarah E. Berger Post Office Box 83 Inglis, Florida 34449
Findings Of Fact The Petitioner is the adjoining neighbor of Harrie E. Smith, the applicant, and runs the Coral Lagoon Resort. This is a commercial establishment which consists of rental units fronting on Bonefish Bay with an interior canal and a series of small boat docking facilities which give each unit docking space and water access. The Petitioner keeps two tame porpoises at the end of this canal which are a tourist attraction. The Petitioner's operation is tourist oriented particularly to those who come to the Keys for fishing or diving excursions. The application to the Department of Environmental Regulation is to the installation of a wooden dock which runs parallel to the Petitioner's northern boundary line. The applicant, Mr. Smith, runs a commercial boat repair facility alongside Mr. Goss' establishment and it is clear there have been misunderstandings between them in the past. The dock has been installed and as noted above, the application to the Department of Environmental Regulation is for an after-the-fact authorization. The department has indicated it intends to grant the permit as it does not see that the dock will degrade water quality or create a condition adverse to the public interest. The petition maintains that the dock will cause water quality problems in that it will encourage the docking of boats which will spill oil, gas and other contaminants into the waters and thereby degrade water quality. It should be noted that the Petitioner maintains extensive docking facilities in his establishment and could be subjected to the same argument.
Findings Of Fact Petitioner SFWMD is a public corporation of Florida. It is charged with the responsibility of issuing permits and enforcing orders relating to surface water management within its jurisdictional boundaries. Respondents Hubschman, as trustees, have full rights of ownership in 1,280 contiguous acres located in Sections 17 and 20, Township 47 South, Range 26 East, Lee County, Florida. These lands are known as Bonita Farms I and II. They are located within the jurisdictional boundaries of SFWMD. In their pre- developed state, these lands could generally be categorized as marsh and wetlands with cypress forest and some uplands in the northern half of the project area. After deciding to develop the acreage for use as pasture and farmland for small vegetable crops, Respondents Hubschman applied for a surface water management permit from SFWMD. The purpose of the permit was to allow the construction and operation of a water management system that would serve both farms. A system was designed to drain water off both parcels through a 62-acre retention area into a natural slough system which runs water into Kehl Canal. In order to create the system, the Respondents Hubschman had the following facilities designed for the site: internal ditches, dikes, pumps, a retention area and control structures. On April 15, 1982, SFWMD issued Surface Water Management Permit No. 36- 00315-S, and Respondents Hubschman were allowed to proceed with their proposed construction plan. A modification to the permit was issued on April 14, 1983. The retention area was enlarged from 62 acres to 88 acres by relocating the perimeter dike. The outfall structure was revised in that the two pumps and the weir were to be replaced by three 18" CMP culverts that would discharge the drained water by gravity flow from the retention area through the slough into Kehl Canal. The duration of the construction phase of its permit was a three-year period, unless the construction of the permitted project discharge structure or equivalent had been completed prior to that date. After the close of the three-year period, there was a dispute between the Respondents and SFWMD as to whether the permit had expired. The controversy was resolved through a compromise agreement. An application for the reissuance of Permit No. 36-00315-S was filed on October 13, 1986. Instead of reissuing Permit No. 36-00315-S, as requested by Respondents Hubschman, SFWMD decided to issue a new permit on May 14, 1987. As part of the processing procedures, SFWMD again reviewed and approved the entire surface water management system designed to serve the 1,280 acres of land proposed by Respondents. Because the additional work proposed for Section 17, the northern section was limited at this stage of development to the selective clearing of additional upland areas to create more improved pasture, the new permit directed attention to Section 20, the southern section of the land. The new permit advised the Respondents that if they wanted to propose additional development to Section 17, they were required to seek a modification of this new permit, Surface Water Management Permit No. 36-00764-S, to include those changes. The Respondents applied for a modification of Permit No. 36-00764-S on July 30, 1987. The proposed modification sought to change the status of the development of Section 17 from improved pasture to small vegetable farmland on 639 acres. The surface water management system plan was modified to drain water in Section 17 to the reservoir on Section 20. The water would be directed via a series of lateral ditches and swales. A six foot high dike and one 27,000 GPM pump were also required. Two additional 18" CMP culverts were required at the discharge facilities to accommodate the increased outflow. The Modification of Permit No. 36-00764-S was approved and issued on June 16, 1988. The original Permit NO. 36-00764-S and its modification are similar to a contract novation because the new permits substituted new obligations between the parties for the old ones under Permit No. 36-00315-S. Based upon this approach to the situation, SFWMD allowed the construction work completed under Permit No. 36-00315-S prior to the Stop Work Order of August 27, 1986, to vest. The completion of the berm around the reservoir in Section 20, as set forth in the letter from Elizabeth D. Ross, attorney for SFWMD, on September 19, 1986, was also allowed to vest. However, if the vested matters were changed in the subsequent permits, they became revisions. The revisions take precedence over the vested matters. Otherwise, completed construction under Permit No. 36- 00764-S as modified, and post Stop Work Order construction remains in effect perpetually for the operation portion of the permit. In order to determine with certainty what was permitted when the Notice of Violation was issued on December 20, 1988, the parties would have to look to the project work actually completed on August 27, 1986, the specific construction approved by SFWMD after that date, the subsequent Surface Water Management Permit No. 36-00764-S issued May 14, 1987, and its Modification issued June 16, 1988. The substantial compliance determination issued by Richard A. Rogers, P.E., Resource Control Department dated September 24, 1987, should also be considered as authorized activity. The Notice of Violation dated December 20, 1988, was issued to Respondent Samuel Hubschman, Trustee. He was advised that recent routine inspections indicate that current on-site activity was in violation of Special Conditions 2,3,4,7,14, 17 & 23 of Permit No. 36-00764-S (issued 5/14/87) and Special Conditions 5,16 & 22 of 36-00315-S (modified 6/16/88). A meeting to resolve these issued was suggested by SFWMD. Respondent Hubschman agreed to attend the meeting through his consultants. Both parties elected to attempt resolution of the Notice of Violation controversy through negotiations in a meeting scheduled for January 5, 1989. To demonstrate their sincerity, the parties agreed not to bring attorneys to the meeting. During the meeting, the parties resolved the controversy by agreeing to the following: SFWMD would no longer consider the project to be in violation of Florida law if the Respondents submitted certain items that would cause SFWMD to issue certain permits and modify others. The Respondents would promptly file an application for a dewatering permit so that the governing board could issue the permit at its March 9, 1989 meeting. The Respondent's contractor would make no field changes in the mitigation or excavation areas without first obtaining appropriate permit modification from SFWMD. Small jockey pumps were to be installed to pump water from the internal water management system into certain cypress and/or mitigation areas for the sole purpose of establishing wetland vegetation within the areas. Respondents were to apply for a modification of Permit No. 36-00764-S, as currently modified, to allow a single phase of mining for the entire affected area. The perimeter dike was to be made structurally adequate. Respondents were to submit an alternative proposal for the disposal of cap rock within ninety days. In the meantime, the contractor could continue to bury the cap rock within the mitigation areas. Both parties demonstrated their reliance on the settlement reached in the meeting by their subsequent actions towards completing and processing the applications for permit modifications and additional permits. Although the noted violations were not cured by these actions, the parties intended to reach a cure or to mitigate for present permit violations through new permit conditions. The preliminary staff review of the Respondents' application for modification of Permit No. 36-00764-S, as currently modified, was completed by March 31, 1989. The following information was requested by SFWMD staff: Revised engineering calculations which reflect that the permitted discharge structure is five 18" CMP culverts. An explanation as to why the 6.3 acre maidencane/juncus marsh designated as a preserve area and the adjacent western preserve area were excavated and otherwise disturbed by project activities. The scrapedown methodology for the replanting of mitigation areas. The Respondents' plans for the area delineated on the plans as pine, which is currently permitted as part of a cypress preservation area. Dike certification and reservoir certification. The above-listed information was required to be returned to the SFWMD within ninety days from the date of the written request. At the close of the ninety days, the information was not received. A second request for a response within thirty days was submitted by SFWMD on August 4, 1989. In September 1989, the Respondents attempted to comply with SFWMD's second request for information. Communications continued in regard to the filed application for modification of Permit No. 36-00764-S, as currently modified, into December 1989. After the thirty days expired for the response to the second request for information dated August 4, 1989, SFWMD filed the Administrative Complaint in these proceedings. After the second request for information, a partial response was received from Respondent Hubschman's consultants. The application continues to go through the review process. It has not yet been deemed complete by SFWMD. As part of the resolution of the Notice of Violation dated December 20, 1988, SFWMD issued permit No. 36-01023-W to Respondent Hubschman for construction dewatering, excavation of an irrigation pond, and water storage at the site. The permit was issued on March 9, 1989. Special condition No. 20 of this permit requires a 200-feet setback from the cypress mitigation area and the irrigation pond being dewatered. The setback is shown on Exhibit 10 of the Bonita Farms Dewatering Application which was made part of the permit. A copy of the permit was attached to the Administrative Complaint. No evidence was submitted by SFWMD regarding alleged violations of Special condition No. 20 which were allegedly observed and documented after the permit was issued, before the filing of the Administrative Complaint Respondent Bob Cadenhead is the contractor hired by Respondents Hubschman to construct the surface water management system. There was no evidence presented to show the connection of another party, Respondent, Cadenhead & Sons Construction, to the project.
Recommendation Based upon the foregoing, it is RECOMMENDED: That Surface Water Management Permit No. 36-00315-S be deemed to have vested as to all construction activity completed under the permit which was not addressed in the subsequent permit issued by SFWMD. The completion of the berm, as set forth in Attorney Ross' September 19, 1986 letter, should also be allowed to vest. That Permit No. 36-00764-S and its later modification be ordered to supercede the prior permit in all matters specifically addressed. That the parties be held to their prior agreements to resolve pending permit violations through the permit modification process. That the alleged dewatering violation in paragraph 19 of the Administrative Complaint be dismissed for lack of evidence. That a specific deadline be set to reasonably complete pending application modifications. That all future enforcement action specifically comply with Rule 40E- 1.612, Florida Administrative Code, and remain separate from any permit or permit modification applications. That the parties create a new, active permit file with current drawings and a specific construction schedule. That the Administrative Complaint and Order filed in these proceedings be dismissed. That future agreements be reduced to writing and signed by the proper parties before they are relied upon by either party. DONE and ENTERED this 9th day of November, 1990, in Tallahassee, Leon County, Florida. VERONICA E. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of November, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 89-5737 Petitioner's Proposed Findings of Fact are addressed as follows: Rejected. Irrelevant. Accepted. See HO number 4. Accepted. See HO number 3. Accepted. Rejected. Improper summary. Accepted. See HO number 6. Rejected. Improper opinion testimony. Rejected. Irrelevant. Argumentative. Rejected. Legal argument. Accepted. See HO number 5. Rejected. Legal argument. Rejected. Contrary to fact. See HO number 15. Rejected. Contrary to fact. See HO number 15. The argument presented in this paragraph is overly punctilious. It ignores the detrimental reliance of opposing parties to the agreement. Rejected. Contrary to fact. See HO number 15 and number 16. Rejected. Legal argument and improper opinion. Rejected. Contrary to fact. See HO number 15 and number 16. Rejected. Matters presented were either not ripe for these proceedings or not proved at hearing. See HO number 16-number 20 and HO number 23. Rejected. Contrary to fact and law. Rejected. Not set forth in pleadings. Irrelevant. Rejected. Not set forth in pleadings. Irrelevant. Rejected. Not set forth in pleadings as separate from the Notice of Violation. Irrelevant. Accepted as fact, resolved by agreement. Rejected. Improper opinion testimony. Rejected. Improper opinion testimony. Rejected. Irrelevant. Rejected. Irrelevant. See HO number 15. Rejected. Irrelevant. See HO number 15. Rejected. Irrelevant. Accepted. Rejected. See HO number 15. Rejected. Cumulative. Rejected. See HO number 11-number 12. Contrary to fact. Accepted. See HO number 9. Accepted. Accepted. See HO number 16-number 20. Rejected. Matter is still pending. See HO number 16-number 20. Rejected. Resolved through agreement. See HO number 15. Rejected. Matter is still pending. See HO number 16- number 20. Rejected. Legal argument. Rejected. Not in pleadings. Irrelevant. Rejected. Irrelevant. Accepted. See HO number 21. Accepted. Accepted. Rejected. Speculative. Respondent's Proposed Findings of Fact are addressed as follows: Accepted. See HO number 13. Rejected. See HO number 23. Contrary to fact and pleadings. Accepted. See HO number 14. Accepted. See HO number 15. Accepted. See HO number 15. Accepted. See HO number 20. Accepted. Rejected. Argumentative. See HO number 20. Accepted. See HO number 4-number 7. Rejected. Contrary to fact. The permit modifica- tion specifically required replacement of a pump with 3 culverts. See HO number 5. Accepted. See HO number 5. Accepted. Rejected. Irrelevant. See HO number 7. Rejected. Irrelevant. See HO number 7. Rejected. Irrelevant. Rejected. Contrary to fact. See HO number 7 and number 11. Rejected. Contrary to fact. See HO number 11. Accepted. Accepted. Rejected. See HO number 15. Additional matters were agreed upon which were not reflected in the letter. This is an incomplete summary. Rejected. Irrelevant. Rejected. Irrelevant to these proceedings. Rejected. Contrary to fact. Accepted. Accepted. Rejected. Contrary to fact. See HO number 8 and number 9. Rejected. See HO number 8 and number 9. Contrary to fact. Accepted. Accepted. Accepted. Rejected. Contrary to fact. Accepted. See HO number 23. Rejected. Contrary to fact. Accepted. COPIES FURNISHED: John J. Fumero, Esquire Office of General Counsel South Florida Water Management District Post Office Box 24680 West Palm Beach, FL 33416-4680 Kenneth G. Oertel, Esquire OERTEL HOFFMAN FERNANDEZ & COLE, P.A. Post Office Box 6507 Tallahassee, FL 32314-6507 Russell Schropp, Esquire HENDERSON FRANKLIN STARNES & HOLT, P.A. 1715 Monroe Street Fort Myers, Florida 33902 John R. Wodraska, Executive Director South Florida Water Management District 3301 Gun Club Road Post Office Box 24680 West Palm Beach, Florida 33416-4680
Findings Of Fact By application filed on October 29, 1980, Respondent/Applicant, Harvey B. Ulano, sought the issuance of a permit from Respondent, Department of Environmental Regulation, to authorize the construction of a private pier for mooring a sailboat at 2640 Northwest Collins Cove Road, Stuart, Florida. A copy of the permit application may be found as DER Exhibit 1. The property in question lies on the North Fork of the St. Lucie River in St. Lucie County. The River is classified as a Class III Water of the Sate. Respondent/Applicant's proposal was received by the Department and reviewed for compliance with applicable State water quality standards. The Department concluded that all statutory and rule requirements, criteria, standards and provisions had been met, including those pertaining to biological productivity impact, water quality and navigation. On January 23, 1981, the Department issued its Letter of Intent to Issue a permit with certain conditions therein, including a prohibition against any dredging and filling associated with the project, the required restoration of submerged lands disturbed by construction activities to their original configuration, the employment of an effective means of turbidity control, and a prohibition against live aboards on boats docked at the pier. A copy of the Letter of Intent to Issue may be found as DER Exhibit 2. The applicant intends to construct a 276 foot long pier from an existing concrete retaining wall on his property which fronts the St. Lucie River. The pier will be built at a perpendicular angle with the shoreline and will be 6 feet wide for the first 240 feet, and 12 feet wide for the remainder of its length. There will be no building or boathouse constructed on the dock, nor will pilings extend above the docking until the area where the boats will be tied. The river is approximately 1500 to 2000 feet wide at the proposed project site. However, the depth of the water close to the shoreline is not sufficient to moor larger boats at low tide. Therefore, it is necessary that the length of the pier be 276 feet in order to insure a minimum 3-foot water depth at all times. Applicant's lot is odd-shaped in size. The waterfront footage is approximately 135 feet. Its sides measure approximately 330 feet on the north boundary and 200 feet on the south. The property of Petitioner, Werner Jungmann, adjoins that of Applicant on the south side and also fronts the river. The pier will be constructed on the northwest corner of Ulano's property, which is the most distant point from Jungmann. Because of the odd shapes of the Applicant's and Petitioner's lots, the end of the pier will project slightly within the lakeward extension of Jungmann's property line. However, the design of the pier is such that it should not obstruct or impair the view of the river now enjoyed by the Petitioner. Navigation in the river and existing channel adjacent to the pier will not be affected by the proposed activity. The shallow water depth in the river next to the shoreline already precludes movements by boats close to the shore. The Department has imposed certain conditions upon the construction and future use of the pier (DER Exhibit 2). These conditions, together with the plans submitted by Applicant (DER Exhibit 1), constitute reasonable assurances that the short-term and long-term effects of the proposed activity will not result in violations of the water quality criteria, standards, requirements and provisions of the Florida Administrative Code, and that the proposed activity will not discharge, emit or cause pollution in contravention of Department standards, rules or regulations.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Regulation issue Respondent/Applicant, Harvey B. Ulano, a permit to construct a private pier for mooring a sailboat on the North Fork, St. Lucie River, subject to those conditions set forth in the Department's Letter of Intent to Issue dated February 23, 1981. DONE and ENTERED this 29th day of May, 1981, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 Filed with the Clerk of the Division of Administrative Hearings this 29th day of May, 1981. COPIES FURNISHED: Ernon N. Sidaway, III, Esquire Post Office Box 3388 Fort Pierce, Florida 33454 Alfred J. Malefatto, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Edward B. Galante, Esquire Suite 310 Florida National Bank Building 301 East Ocean Boulevard Stuart, Florida 33494
The Issue The issue in this case is whether the Southwest Florida Water Management District (District) should issue to Century Realty Funds, Inc. (Century) Environmental Resource Permit (ERP) No. 44000227.002 (the ERP), which would modify Management and Storage of Surface Waters (MSSW) Permit No. 400227.000 (the Permit) and Stormwater Exemption No. EO1481, issued by the District to Century in July 1985 for construction of a surface water management system for Angler's Green Mobile Home Park located in Mulberry, Polk County, Florida.
Findings Of Fact The District issued Management and Storage of Surface Waters (MSSW) Permit No. 400227.000 and Stormwater Exemption No. EO1481 to Century in July 1985 for construction of a surface water management system for Angler's Green Mobile Home Park (MHP) located in Mulberry, Polk County, Florida. Angler’s Green MHP Angler’s Green MHP is an 83-acre residential golf course development of approximately 385 homes located off of State Road 37 near Mulberry. Residents at Angler’s Green own their own mobile homes and lease the residential lots pursuant to annual leases expiring December 31 of each year, with guaranteed renewal conditioned upon owner compliance with the terms and conditions of the lease. Prior to being developed as a mobile home park, the property which is now Angler’s Green MHP was part of a phosphate mining operation and was reclaimed under a phosphate mining land reclamation plan approved by the Florida Department of Natural Resources and a reclamation contract dated September 4, 1984. Final contours of the Angler’s Green site were made in accordance with the approved reclamation plan. After reclamation contouring, a 23-acre manmade (former phosphate mine pit) lake remained in the northeast quadrant of the Angler's Green site. The resulting lake had a finger arm (bay or cove) extending from the southwest corner of the main body of the lake, oriented in a north-to-south direction and located west of a peninsula of land extending into the northwest part of the lake from the north. The lake also had a short, narrow canal leading into the main body of the lake from the south; the canal connected at a right angle to longer narrow waterway to the south of and extending parallel to the main body of the lake in an east-to-west orientation. There also were two smaller ponds on the property after reclamation contouring. After reclamation, surface water onsite generally flowed westerly and discharged from the property to a railroad ditch along the western boundary of the property. The recorded post-reclamation, pre-development water level for the 23-acre lake, as indicated on the site grading plans, was around 127.1 to 127.8 feet above Mean Sea Level (M.S.L.). The 1985 Permits On July 10, 1985, the District issued MSSW Permit No. 400227.000 and Stormwater Exemption No. EO1481 to Century to authorize the construction of a surface water management system for Angler’s Green. The MSSW Permit had an expiration date of July 10, 1988. As designed, the permitted Angler’s Green surface water management system was to route internal stormwater runoff to swales, detention ponds, and catchment areas before discharging through a sidebank sand filtration system (a berm approximately 300 feet long containing an 8” perforated drain pipe covered by a filter fabric and sand filter material) to receiving waters at the northwest corner of the property. The permitted system was designed with five drainage areas known as Basins A through E. Basin A was in the southeast quadrant of the site; Basin B was to its east in the southeast quadrant of the site; Basin E was to the north of Basin A and included the 23-acre former phosphate mining pit reclaimed as an artificial lake, which was referred to as “Lake E” or sometimes “Pond E"; Basin C was to the west of Basin E; and Basin D was to the west of Basin C and to the north of Basin B. The two smaller ponds on the property were designated Pond C-1 and Pond B-1 and were located in Basin C and Basin B, respectively. Basin D was in the northwest corner of the site; the discharge structure was in the northwest corner of Basin D. As the system was designed, stormwater from Basin E would appear to sheet flow naturally into Lake E; stormwater from Basin A would appear to flow naturally to the southwest, away from Lake E, but the system routed the water from the southwest corner of Basin A to the western end of the waterway on Lake E through an underground pipe. Stormwater from Basin B was to flow to and be retained in Pond B-1; as the system was designed, surface water was not designed to discharge offsite from Basin B. As designed, Lake E served as a detention pond for water from Basin E and Basin A. It was to have a control structure (CS-1) in the arm of Lake E that would produce a seasonal fluctuation range of two feet, from 127.5’ above M.S.L. to 129.5’ above M.S.L. Stormwater discharging from CS- 1 was to be conveyed by pipe to Pond C-1, where it was to mingle with surface water draining from Basin C. When full, Pond C-1 would cascade into the golf course area in Basin D and, as necessary, in a portion of Basin B. After catchment and detention in the golf course area, overflow was eventually and ultimately to discharge offsite through the side-bank sand filtration system in the northwest corner of Basin D. In this manner, the Angler’s Green surface water management system was designed to accommodate the 24-hour, 25- year storm event, which was estimated to produce approximately 8 inches of water in a 24-hour period. It also was designed to comply with the water quality requirements as specified in Florida Administrative Code Chapter 17-25 (1985 Ann. Supp.) by detaining the first half-inch of runoff before discharging it offsite through the sidebank sand filtration system in the northwest corner of Basin D. (All rule citations are to the Florida Administrative Code.) Omission of the Stangls During the review process, the District noted from drawings submitted as part of Century's MSSW Permit application that the project area did not include approximately the eastern third of the main body of Lake E. District staff brought this to Century's attention in a request for additional information (RAI) and stated: "If possible, you should obtain a perpetual right to operate and maintain the lake from other owners." In response, Century falsely represented to the District that L. Kirk McKay, a joint venture partner of Century, was the only riparian owner on Lake E and that Century had obtained from him a perpetual right to operate and maintain Lake E as part of the MSSW Permit. In fact, the Stangls owned property on the east side of the lake, including approximately 500 feet of lakefront and contiguous lake bottom. The Stangls and two partners purchased the property from McKay himself in 1979. The Stangls bought out their partners in 1984. The District relied on Century's misrepresentation. The District would not have issued the MSSW Permit to Century if the District had known that Century did not own or control all the land being used for the Permit--specifically, including all of Lake E. See Rule 40D-4.101(1)(d) and (2)(d)6. (1985) (application must include "evidence of ownership or control"). In addition, because the District was unaware of the Stangls' ownership of a portion of Lake E, the District did not require Century to give the Stangls direct, actual notice of the Century's permit application. Instead, the District only required that Century publish notice of the District’s receipt of the permit application. Notice was published on April 3, 1985, in the Lakeland Ledger, a newspaper of general circulation qualified under the terms of Section 50.011, Florida Statutes. But the Stangls did not see the published notice, were unaware of the permit application, and did not ask to participate in the permitting process. The Stangl property adjacent to Angler’s Green remained undeveloped and unoccupied until 1999, when the Stangls' son, John, established a business on the site. Prior to 1999, the Stangls visited the property a couple times a year. They were fully aware of the construction and operation of Anglers Green as a mobile home park across Lake E. During this time, Century leased 385 lots with guaranteed annual renewal conditioned only upon compliance with lease terms and conditions. Amenities under the leases included clubhouse and golf course privileges. At no time before 2000 did the Stangls take any action to challenge the validity of Century's 1985 MSSW Permit. 1985 Surface Water Management Permitting Requirements In 1985, permitting requirements for surface water management systems were divided between two regulatory schemes. Surface water management permits in Polk County were issued by the District under Chapter 373, Florida Statutes, and Rule Chapters 40D-4 and 40D-40, which addressed water quantity and flooding issues for projects greater than and less than 40 acres, respectively. Water quality permits or exemptions from water quality permitting requirements were issued by the Department of Environmental Regulation under Chapter 403, Florida Statutes, and Rule Chapter 17-25 to address water quality concerns. It was not until 1988 that permitting requirements were consolidated into the MSSW regulatory program administered by the District under Rule Chapters 40D-4 and 40D-40. In 1985, the District did not have a Basis of Review (BOR) to specify system design requirements for applicants to provide reasonable assurances that the conditions for issuance of surface water permits were satisfied. Standards and criteria for the design and performance of surface water management systems were contained in Rule 40D-4.301(2) (1985) Under subsection (2)(i) of that rule, projects designed to meet the requirements of Chapter 17-25 [Regulation of Stormwater Discharge] were presumed to meet applicable State water quality requirements. There were no requirements for wet detention pond littoral zones. 20. Under Rule 17-25.03(2)(b) (1985 Ann. Supp.), stormwater management systems for projects with drainage areas less than 100 acres that provided retention or detention with filtration of the first half-inch of runoff were exempt from the permitting requirements of Rule Chapter 17-25. 21. In 1985, District Rule 40D-4.301(2)(j) (1985) allowed for natural areas and existing water bodies to be used for stormwater retention or detention purposes when not in conflict with environmental or public use considerations. Areas that could be considered for this purpose included previously-degraded areas or man-made areas (such as borrow pits). Apparently, the District allowed Century to use Lake E as a detention pond under this provision. Deviations from MSSW Permit Angler’s Green MHP was constructed in two phases, with the first phase completed in 1985, and the second phase completed in 1987. Construction of at least the part of the surface water management system to serve the first phase took place prior to 1985; it was not clear from the evidence whether construction of the part of the surface water management system to serve the second phase also took place prior to 1985, but it clearly took place prior to construction of the second phase in 1987. Condition No. 4 of Century's MSSW Permit required the submittal of a certification that the system was constructed in accordance with the approved and permitted design. But Century did not provide any such certification. Century also never certified to the District that its new stormwater discharge facility, as constructed, continued to qualify for exemption from State water quality requirements. Although the surface water management system was constructed and operating, the District never transferred the 1985 Permit to the operation phase. In several respects, the Angler’s Green surface water management system was not constructed as designed, approved, and permitted in 1985. The pipe to convey stormwater from the southwest corner of Basin A back to the Lake E waterway apparently never was constructed; instead, stormwater from Basin A was routed to Pond B-1. (There also was a berm constructed in Basin A near the southern boundary of the site; but that berm apparently was a visual berm, and there was no evidence that it affected performance of the surface water management system.) Control structure CS-1 (which was supposed to be located in the arm or bay of Lake E) and the pipe to convey overflow from there into Pond C-1 also never were constructed. By the early 1990's, Angler's Green was experiencing flooding in the golf course area in Basin D and B for extended periods of time. In November 1993, the District responded to a complaint of flooding in that vicinity. Upon investigation, the District determined that malfunction of the surface water management system serving Reservation Lakes (now known as Paradise Lakes), a development to the north and downstream of the Angler's Green system, was causing water to back up through the wetlands and the sand filtration system in the northwest corner of the Angler’s Green project. As a result, water overtopped the discharge structure, equalized at levels above the top of the discharge structure's berm, and flooded the golf course for extended periods of time. At some undetermined point in time, an unpermitted pond was dug in Basin D, apparently in an attempt to alleviate flooding of the golf course. In addition, possibly for the same purpose, a pump was installed in Basin D near Pond C-1, and a pipe was installed to convey stormwater from there into Lake E. The sidebank sand filtration system designed to provide filtration of stormwater prior to discharge from the northwest corner of the site does not appear to exist today. It may be present but difficult to see after 15 years of plant growth; or it may have been removed or disturbed as a result of re-grading in the area. However, the evidence proved that the discharge structure was present in 1993, and there is no reason to believe that it was not installed during construction of the surface water management system--i.e., by 1987 at the latest. In addition, at some undetermined point in time, a pipe was installed at the northeast corner of Lake E to convey overflow from Lake E eastward to a drainage ditch located alongside SR 37 to the north of the Stangls' property. No witnesses could testify as to when the pipe to the SR 37 ditch was installed or its elevation. (The District and Century state in their PRO that Map No. 2 in P/I Exhibit 14--an aerial map/survey submitted to the District by Century on August 13, 1990, as part of Century's 1990 Water Use Permit No. 209993.000 application--notes the pipe's elevation as 127.95 feet above M.S.L.; but no such finding could be made from review of the exhibit.) Roads in Angler's Green have inverted crowns to convey runoff from roads, driveways, and roofs away from mobile home lots. Some runoff from these impervious surfaces appears to be directed into a swale on the east side of the site; this swale leads to Lake E. In addition, approximately 12 drains have been installed in or near roads in Angler's Green that convey water through pipes directly into Lake E or Pond C-1. Under current Rule Chapters 40D-4 and 40D-40, road drains connecting impervious surfaces to Lake E would have to be shown on application construction drawings, and separate stormwater calculations would have to be provided in an application. But in 1985 this was not required. Century's calculations, together with flow arrows on drawings showing the direction of stormwater flow towards the detention ponds, were considered sufficient--especially since Century's calculations used a relatively high runoff co-efficient. As a result, the existence of these drains and pipes are not considered to be substantial deviations from the original, approved design. Similarly, approximately 64 roof drains and pipes conveying water from roofs directly into Lake E and Pond C-1 would not be considered substantial deviations from the original, approved design. In addition, these apparently were installed by mobile homeowners over the years, not by Century. From 1985 to 2000, the District did not have occasion to address regulatory concerns at Angler’s Green, except for the complaint of flooding in the golf course area that occurred in November 1993 and a more recent complaint about an area of the golf course that was designed to flood under certain conditions. Otto Stangl’s Complaint and the District’s Response Around November 1999, John Stangl noticed a fish kill in the ditch along SR 37 near the Stangl property. He also was contacted by a governmental compliance officer concerning the fish kill. Upon investigating, John Stangl saw the unpermitted pipe leading from Lake E that was discharging into the SR 37 ditch where the fish kill was observed, as well as the unpermitted pump that was pumping water from the Angler’s Green golf course area through a pipe that discharged into Lake E. In February 2000, Otto Stangl complained to the District about the fish kill and the existence of the unpermitted structures associated with Lake E. Upon receiving Otto Stangl’s complaint, District staff conducted site visits of the Angler’s Green project. Staff observed the unauthorized pump and pipe conveying water from Pond C-1 to Lake E and the unauthorized pipe conveying water from Lake E to the SR 37 ditch. Staff also observed that the Lake E control structure was missing, the pipe to convey stormwater from Basin A to Lake E was missing, and Basin D had been re-graded. In February 2000, the District also became aware of the fact that Century did not have full ownership or control of Lake E. On March 15, 2000, the District issued Century Notice of Non-Compliance and directed Century to either construct the system as designed and permitted or to seek a permit modification. On May 8, 2000, Century submitted a letter application to modify the original MSSW Permit No. 400227.000 by constructing the originally permitted Lake E control structure and pipe conveying water from Lake E to Pond C-1, but in a different location in Lake E than originally permitted due to the existence of homes at the location where these structures were originally planned. The application was subsequently amended to be a formal modification upon Century’s request for further modification to allow Basin A stormwater to flow to Pond B-1 and to expand Pond B-1 and add a control structure and an effluent filtration system. Despite having actual knowledge since at least February 2000 that the Angler's Green surface water management system was built partially on their property, the Stangls did not ask for a hearing on the 1985 Permit. Instead, they awaited the District's consideration of Century's modification application and sought to challenge the District's notice of intent to grant the modification permit issued on October 29, 2001. The District’s Regulatory Compliance Practices In the 1980's, the District appeared to pay little or no attention to construction of permitted projects or submission of required post-construction certifications. Many projects permitted by the District in the 1980’s, such as Angler’s Green, were built and operating although no certifications had been submitted; as a result, the permits issued for these projects never were transferred to the operation phase. Eventually, some projects not built in compliance with issued permits came to the attention of the District, typically through third-party complaints about drainage problems and flooding. By this time, there was a large backlog of issued construction permits for which no required post-construction certifications had been submitted. The backlog of these older projects was so large that the District decided not to initiate an aggressive, systematic, and comprehensive review of all permits for which no required certifications had been submitted. Instead, projects were checked on an ad hoc basis as complaints regarding the functioning of their surface water management systems were registered. When it came to the attention of the District in this manner that a project had been built under an MSSW permit but that no required certifications had been submitted, the District first attempted to secure the required certifications in the form of certified as-built construction drawings and a Statement of Completion, as required by BOR 2.7. In so doing, it was common practice for the District to accept certifications beyond the expiration date on a permit. If projects were substantially completed, the District would not deem the permit as expired simply because the required certifications had not been submitted before the expiration date; and such projects did not lose their status as being permitted. It should be noted that, according to the testimony of the District's expert, William Hartmann, this agency practice was not based on an interpretation of Rule 40D- 4.321(1)(b) (1985) (on duration of construction permits). Rather, the agency practice was to ignore the expiration of the construction permit under those circumstances. In addition, it does not appear from the evidence that the District ever before has faced the situation presented in this case--where a person on whose property part of a surface water management system was built without the person's consent opposes modification and asserts the construction permit has expired. In cases where the agency's practice was applied, if the required certified as-built construction drawings and Statement of Completion could not be provided because the project was not built in accordance with the MSSW permit, the District would require the permittee to either bring the system into compliance with the approved permit designs or obtain a modification of the construction permit. Letter modifications would be accepted when the requested modification would not substantially alter the permit authorization, increase the authorized offsite discharge, impact the environmental features of the project, decrease the required retention/detention, decrease the required flood control elevations for roads or buildings, or decrease pollution removal efficiency. See Rule 40D-4.331(2)(b) (1985). (The current version of the rule adds renewal or extension of the existing permit duration.) Alterations meeting the threshold requirements for a letter modification would be presumed to meet the conditions for issuance for a permit. Otherwise, formal permit modifications would be required. When application is made for a permit modification, the District’s practice is to evaluate those aspects of the surface water management system being modified. Review generally would not extend to the entire system. Permittees seeking to modify their surface water management systems generally are not required by the District to bring the unmodified portions of the system into compliance with current design criteria. Proposed ERP Permit Modification ERP Application No. 44000227.002 seeks authorization to modify portions of the Angler’s Green surface water management system. The specific alterations for which approval is sought are: permanent removal of the existing, unpermitted 18-inch pipe between Lake E and SR 37 roadside ditch; permanent removal of the pump and associated piping conveying water from Pond C-1 to Lake E; installation of the control structure (CS-1), together with installation of pipe to convey water from the control structure to Pond C-1, as designed and approved in the 1985 Permit but different location in the northwest corner of the main body of Lake E; re-grading of the northwesterly portion of the golf course to more closely conform to the original permitted plan and help keep Basin B separate from Basin D; reconstruction of the side-bank sand filter system in the northwest corner of the property, as designed and approved in the 1985 Permit but with a slightly higher invert elevation (122.04 feet above M.S.L.) to prevent water from backing up into Angler's Green from Paradise Lakes again, and with a concrete flume and spreader swale between Pond C-1 and the berm of the side-bank sand filter system; enlargement of Pond B-1; installation of a control structure on Pond B-1; and installation of 100 feet of 6-inch side-bank sand filter discharging to the southwest corner of the property from Pond B-1. By removing the unpermitted pipe to the roadside ditch along SR 37 and by constructing control structure CS-1, with the same control elevations as in the 1985 Permit (albeit at a different location in Lake E), and connecting CS-1 by pipe to Pond C-1 as envisioned in the 1985 Permit, the function of Lake E should approximate its function under the design approved in 1985. Modifying the permitted design to authorize Basin A to flow to Pond B-1 instead of Lake E results in less water flowing to Lake E; these changes will not increase water quantity or quality impacts to Lake E, as compared to the 1985 Permit. As compared to reclamation conditions prior to implementation of the 1985 Permit, water quantity and quality impacts to Lake E would be expected both under the system as designed and permitted in 1985 and as proposed to be modified, by virtue of the similar use of Lake E as a detention pond under either system. Pond B-1 is being enlarged to better accommodate the flow from Basin A. The control structure being added at Pond B-1 will control flow into the swale to the west so as to address water quantity impacts in that area. Stormwater calculations for the revised Pond B-1 demonstrated that the post-development discharge rate will not exceed the pre- development discharge rate, so that there are no concerns for adverse water quantity impacts to receiving waters or adjacent lands or flooding impacts to on-site or off-site property. The historical flows to the west are still maintained. The discharge structure being added at Pond B-1 will account for treatment of the Basin A flow. Based on calculations for revised Pond B-1, the enlarged pond will retain and percolate half an inch of stormwater runoff from the contributing area in 36 hours (which is consistent with current BOR design requirements). The proposed Pond B-1/Basin B modifications, including the routing of Basin A stormwater to Pond B-1, will not adversely affect the quality of receiving waters in that vicinity such that state water quality standards would be violated. Angler's Green is located in the Southern Water Use Caution Area of Polk County. No surface or groundwater levels or surface water flows have been established for this area under Section 373.042, Florida Statutes. The proposed modifications do not involve any works of the District. The proposed modifications are based on generally accepted engineering and scientific principles and employ treatment methods of effluent filtration which involve commonly accepted designs that can be effectively performed and function as proposed. There are no concerns about Century’s financial, legal, or administrative capability to undertake the proposed modifications as specified in the permit, if issued. There are no applicable special basin or geographic area criteria established for this area. Environmental Concerns As with its review of the proposed permit modification for water quantity impacts, the District's review of environmental concerns was limited to review of impacts from the proposed modifications to the original permitted design; unmodified portions of the original permit were not reviewed for compliance with current requirements. An approximately 20 square-foot permanent impact is proposed to Lake E due to the placement of the control structure (SW-1) in the water. A 379 square-foot temporary impact is proposed to Lake E due to the placement of a cofferdam to facilitate construction of the control structure. Temporary impacts to Lake E resulting from the construction of the control structure would be addressed through the use of sediment and erosion controls to prevent possible sedimentation and turbidity that may arise during the construction activity. The placement of a control structure in Lake E would create very minor permanent impacts resulting from the loss of the footprint of the control structure. These impacts would be insignificant. Due to the very minor nature of these proposed impacts, no mitigation would be required, and no loss of wetlands would be required to be recorded on the Wetlands/Surface Water Table. Construction of SW-1 would not adversely impact the value of functions provided to fish and wildlife, and listed species including aquatic and wetland dependent species, by wetlands, other surface waters and other water related resources of the District. No secondary impacts would be expected from construction of SW-1. No unacceptable cumulative impacts upon wetlands and other surface waters would be expected to occur as a result of construction of SW-1. The project area includes .71 acre of herbaceous/forested wetlands (WL-1) in the northwest corner. The potential for secondary impacts is addressed by an existing fence surrounding WL-1, which eliminates concerns for secondary impacts to this wetland area. No adverse impacts would be anticipated to occur to these wetlands, and no adverse secondary impacts to the water resources would be expected to occur as a result of the proposed modifications themselves. The proposed modifications would not cause unacceptable cumulative impacts to wetlands and other surface waters. Class II or Class III waters would not be affected by the proposed modification project. Therefore, Rule 40D- 4.302(1)(c) is not applicable. No seawalls, lagoons or estuaries are involved in this project. Therefore, Rule 40D-4.302(d) is not applicable. The proposed modifications would not be contrary to the public interest. Relocation of a control structure and enhancement of the Basin B portion of the system would create no significant change in impacts. The proposed modifications constitute a slight improvement over water quality from the original permitted design. No threatened or endangered species were identified for Angler’s Green. The proposed relocation and construction of the Lake E control structure, preservation of onsite wetlands in the northwest corner, and re-design of Pond B-1 present no environmental concerns. Consequently, the proposed modifications do not create any potential for adverse effects regarding the conservation of fish and wildlife, including endangered or threatened species or their habitats. The proposed modifications do not adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity. The project area does not involve navigable waters and does not affect the flow of water or cause harmful erosion or shoaling. Hence, Rule 40D-4.302(1)(a)(3) does not apply to this permit modification application. There are no significant historical and archaeological resources involved in this Project. Therefore, Rule 40D-4.302(1)(a)(6) is not applicable to this permit modification application. The proposed modifications would not be contrary to the public interest; they would not adversely affect the public health, safety or welfare or the property of others. No adverse impacts are anticipated to occur as a result of the proposed modifications. The proposed modifications maintain the historic water elevation for Lake E and maintain historic flows for the project area. The modified system should also provide some improvement in water quality.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order denying Century's permit modification application designated ERP No. 44000227.002. DONE AND ENTERED this 8th day of July, 2002, in Tallahassee, Leon County, Florida. ________________________________ J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of July, 2002. COPIES FURNISHED: Joseph D. Magri, Esquire Merkle & Magri, P.A. 5510 West LaSalle Street Tampa, Florida 33607-1713 Joseph P. Mawhinney, Esquire Clark, Campbell & Mawhinney, P.A. Post Office Box 6559 Lakeland, Florida 33802 Martha A. Moore, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899 E. D. Sonny Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34604-6899
The Issue The issues are whether Respondent violated Rule 62-532.500(2)(d)1., Florida Administrative Code, by failing to seat a well casing in a rock layer or other such consolidated formation, and if so, what penalty should be imposed.
Findings Of Fact Respondent is charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. Respondent's duties include the regulation of water wells and water well contractors. Respondent is a water well contractor. As such, he holds Water Well Contractor License No. 2215. On September 25, 1997, Petitioner issued Respondent Well Construction Permit No. 597679.01. The permit gave Petitioner permission to construct a water well, four-inches in diameter, on property owned by Rex Hobbs in Pasco County. Respondent subsequently constructed the water well on the property owned by Mr. Hobbs, using the cable tool construction method. Respondent completed construction of the well on or about October 20, 1997. After the well was constructed, Mr. Hobbs complained to Respondent on several occasions that the well was producing sand, rock, and other debris. Respondent made no attempt to repair the well. In May or June of 1998, Mr. Hobbs filed a complaint with Petitioner regarding the construction of the well on his property. Petitioner's subsequent field investigation did not reveal a significant amount of sediment in the well water. Mr. Hobbs filed a second complaint with Petitioner in the summer of 1998, insisting that the water from his well contained an excess amount of sediment. Petitioner's second field investigation revealed an abnormal amount of sediment in the well water. On July 9, 1998, Petitioner issued a Notice of Violation, advising Respondent that he had violated Rule 40D-3.037(1), Florida Administrative Code, by failing to seat the casing of the Hobbs well into a consolidated formation. Water from the Hobbs well contains sediments including sand, rock, and other debris. These sediments interfere with the operation of plumbing, appliances, and irrigation devices, which utilize water supplied by the well. The quality of the well water produced by the Hobbs water well is unacceptable. The total depth of the Hobbs well is 131 feet below land surface. The well is cased to 42 feet below land surface. The water pump is set at 84 or 86 feet below land surface. The static water level was 58.2 feet below the land surface. The geologic formation at the end of the casing of the well contains gray clay, yellow clay, limerock, and sand. The end of the casing is not seated in a layer of rock or other consolidated formation. There is no persuasive testimony to the contrary. The area in which the well is located is geologically unstable. Wells in that area generally require 84 feet of casing. Respondent admitted at the hearing that the well is producing sand and needs more "pipe." Failure to seat a well casing into a consolidated formation is a major violation under the Florida Department of Environmental Protection's Water Well Contractor Disciplinary Guidelines and Procedures Manual. Respondent has entered into three previous Consent Orders with Petitioner to resolve permitting and construction violations.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That Petitioner enter a final order requiring Respondent to pay an administrative fine in the amount of $500 and assessing five points against his water well contractor's license. DONE AND ENTERED this 18th day of August, 1999, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 18th day of August, 1999. COPIES FURNISHED: Margaret M. Lytle, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Tony Holt 6145 Durant Road Durant, Florida 33530 E. D. Sonny Vegara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Petitioner L. C. Prevatt is the owner and operator of the Riverview Speed Wash, Inc., a coin operated laundry which has been in existence for over ten years. The facility has twelve top load washers, four double load washers, one triple load washer and seven gas dryers. It is open from 7:00 a.m. to 9:00 p.m., seven days a week. The facility is located in a shopping center in space which petitioner rents on a month-by-month basis. The facility utilizes a 0.0075 mgd waste treatment plant with effluent disposal to a county-owned drainage ditch which is connected and discharges to the Alafia River approximately 0.6 miles south of the facility. On or about May 29, 1981, petitioner submitted an application for a temporary operation permit for his Riverview laundry facility. Temporary operation permits are issued by the DER when a facility is not currently meeting State water quality standards and the applicant needs or desires a period of time to bring the facility up to the applicable standards. Here, the petitioner stated on his application that no upgrade of the waste treatment facility was planned. The application further stated that the facility would be connected to an area wide regional waste treatment system when that system became available. After numerous requests for further information from the applicant and various inspections of the facility, the DER issued its notice of intent to deny petitioner's application for a temporary operation permit. Reasons for the intended denial included failure to provide requested background water quality information, failure to provide a proposed water quality standards compliance schedule, failure to provide reasonable assurance that a municipal sewer would be available as an alternative means of disposal and improper and deficient operation and maintenance of the facility. Numerous inspections of the petitioner's facility by personnel from the DER and the Hillsborough County Environmental Protection Commission revealed that the facility was not functional in terms of operating correctly and that the design of the plant was inadequate to meet State water quality standards. Specifically, these inspections revealed that the chlorination equipment was not operational, that the trickling filter was not operational, that the removal rates for BOD and suspended solids were consistently and significantly less than the State standard of 90 percent, that the discharge and effluent were of a milky color and would not meet the State standards for turbidity and color, that the water quality of the drainage ditch was extremely low and that the water quality results were actually worse after going through the existing system. It was determined that the discharge was degrading the quality of the receiving waters and that, even if the petitioner's operational and maintenance problems were solved, the design of the facility is not adequate to assure future compliance with State standards. Petitioner admits that his facility does not currently meet State water quality standards. In mitigation, it is contended that many other laundries in the area also do not meet State standards, that it is not economically feasible to redesign the facility to attain compliance, that he has no land available upon which to discharge effluent and that he would be willing to install a sand filter and did have the permission of the manager (not the owner) of the property to discharge effluent into the parking lot drain ponds. No written evidence of this agreement was adduced and there was no demonstration that such runoff ponds would be able to hold and/or treat effluent from the petitioner's facility. There was also no evidence offered to demonstrate that a municipal or regional sewer system would be available in the near future to serve the laundry facility.
Recommendation Based upon the findings of fact and conclusions of law recited above, it is RECOMMENDED that petitioner's application for a temporary operation permit for Riverview Speed Wash, Inc. be DENIED. Respectfully submitted and entered this 7th day of September, 1982, in Tallahassee, Florida. DIANE D. TREMOR, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of September, 1982. COPIES FURNISHED: L. C. Prevatt Post Office Box 998 Gibsonton, Florida 33534 William W. Deane, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301