Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
VICTOR CHADEE vs. BOARD OF NURSING HOME ADMINISTRATORS, 84-002225 (1984)
Division of Administrative Hearings, Florida Number: 84-002225 Latest Update: Feb. 19, 1986

Findings Of Fact Petitioner first applied for licensure as a nursing home administrator with the Board on September 21, 1978 and subsequently passed the Nursing Home Administrators Examination on December 12, 1980 but was denied licensure by letter from the Board on March 3, 1981. Upon denial of licensure by the Boards Petitioner timely requested a formal hearing in accordance with Section 120.57(1), Florida Statutes, but on April 23, 1981 Petitioner, by letter to the Hearing Officers withdrew his request for a formal hearing and the file was closed on April 28, 1981 by the Hearing Officer. Petitioner reapplied for licensure as a nursing home administrator on April 20, 1984 and the Board relying on Petitioner's previous passing score did not require Petitioner to retake the examination. The Board again denied Petitioner licensure and by letter dated May 31, 1984 stated as grounds for denial the Petitioner's record as owner of Lakeview Manor Nursing Home and Royal Nursing Home, as more specifically set out in the Board's letter of March 3, 1981. The Board concluded: You are not of good characters as required by Section 468.1685, F.S., and Rule 21Z-11.01, F.A.C. The consistent failure of Lakeview Nursing Home and Royal Nursing Home to show compliance with the law concerning patient trust funds is attributable to you, and is a violation of Section 468.1755(g)(k), and (m), F.S. The consistent pattern of late payment of bills of Royal Nursing Home and Lakeview Manor Nursing Home and the consequent narrow escapes from the termination of utility services and cessation of delivery of food and necessary supplies is attributable to you and is a violation of Section 468.1755(g), (k) and (m), F.S. The pattern of inadequate supplies of cleaning materials, food, and other supplies at Lakeview Nursing Home and Royal Nursing Home is attributable to you and constitutes a violation of Section 468.1755(g)(k) and (m), F.S. Instances of inadequate staffing of nurses at Royal Nursing Home are attributable to you and constitute violations of Section 468.1755(g)(k) and (m), F.S. The failure of Lakeview Manor Nursing Home and Royal Nursing Home to pay administrative fines levied by the Department of Health and Rehabilitative Services is attributable to you and constitutes a violation of Section 468.1755(m), F.S. The failure of Royal Nursing Home to pay unemployment taxes for over one year, which was not remedied until a suit seeking a hiring freeze was imminent, is attributable to you and constitutes a violation of Section 468.1755(g)(k) and (m), F.S. Between the time of Petitioner's application on September 21, 1978 and passing the examination on December 12, 1980, Petitioner had provided the Board with documents and information sufficient for the Board to make a determination as to Petitioner's eligibility for licensure provided he had sufficient experience as a nursing home administrator. Apparently, required information on Petitioner's experience was furnished to the Board at a later date because neither the Board's denial of March 3, 1981 nor May 31, 1984 were based on lack of experience. Background investigations of applicants are part of the application process conducted by the Board. In certifying an applicant for licensure, the Board must consider the applicant's good character and suitability to be an administrator, including ability in financial management and administration, in addition to the qualifications for examination set out in Section 468.1695, Florida Statutes. See Section 468.1685(1)(2)(3), Florida Statutes and Rule 21Z.11.01, Florida Administrative Code. Prior to moving to Florida, Petitioner owned and operated nursing homes in Canada but was not required to be licensed as a nursing home administrator. From 1978 until sometime after filing his application on April 20, 1984, Petitioner was President of V & C Enterprises, Inc. (V&C) which owned and operated Lakeview Manor Nursing Home (Lakeview) during this entire period. V & C was wholly owned by Rose Chadee, Petitioner's mother. V & C surrendered its license to operate Lakeview in early 1985. Petitioner was president and majority stockholder (90 percent) of V & L Nursing Home Services, Inc. (V & L) which owned and operated Royal Nursing Home, a/k/a Palms Nursing Home (Royal/Palms) during 1980-82 but ceased operations of Royal/Palms in 1982 because of financial difficulties. Pursuant to Chapter 400, Florida Statutes and Rules 10D-29, Florida Administrative Code the Department of Health and Rehabilitative Services (HRS) licenses facilities to operate as nursing homes. Such a license is issued to the owner of the home. In accordance with its licensing function, HRS conducts an annual survey of each facility, to determine compliance with Chapter 400, Florida Statutes and Rule 10D-29, Florida Administrative Code. As a total process, HRS looks at: (a) the financial ability of the facility to operate, (b) direct nursing care, (c) dietary, (d) patient's diets (e) supplies needed to meet the needs of the patients, (f) physical plant, (g) housekeeping, (h) maintenance, (i) linens, and (j) infection control practices in the nursing home. At other times, HRS visits the facilities to investigate complaints, for appraisal units based on other agencies' reports, and for other surveillance visits. When deficiencies are noted on any visit, the facility is given an opportunity to correct the deficiency but if the correction is not timely made then the facility is subject to sanctions in the form of an administrative fine, moratorium on admissions or revocation of license. The performance at Lakeview prior to October, 1982 resulted in an increase in the number of visits by HRS to Lakeview and from October 1982 until January 1985 HRS inspected Lakeview weekly to biweekly because of the continuing lack of compliance with HRS rules. As a result of these visits, Lakeview was often cited by HRS for deficiencies during this period. Petitioner was present at Lakeview during some of these visits, and was aware of Lakeview's noncompliance. During 1980-81 administrative complaints were filed against the license of V & L which V & L failed to answer and in at least two (2) instances fines were imposed but never paid. The types of deficiencies cited during the surveys, and which formed the basis of the administrative complaints and sanctions, included problems relating to patient care, maintenance of adequate supplies, infection control procedures, and violations of regulations governing control and accounting of patient trusts funds. During Petitioner's service as president of V & C and V & L there was a great deal of turnover in nursing home administrators of the facilities. There were at least ten administrators within the two year period of 1979 to 1981. As president, Petitioner had the authority to hire and fire administrators. Petitioner sought to control his business. Administrators were "disciplined accordingly" for failure to manage the homes in accordance with how Petitioner felt it should be run. Much of the difficulty encountered by V & C and V & L in the operations of Lakeview and Royal/Palms related to financial management and the availability of funds to adequately operate the homes. There were significant problems relating to the timely payment of creditors. Amounts owing to Peoples Gas System were in a constant arrears status during 1980 and part of 1981. At Lakeview, supplies had to be obtained on a C.O.D. basis. At Royal/Palms, it was the usual situation to have a shortage of supplies and linens and a restricted food service department because of financial constraints. Administrators did not have access to funds to administer the home without the intervention of the corporation and its president, the Petitioner. V & L did not pay unemployment taxes to the State of Florida for the period of October 1979 to December 1980, until February 1981. Other examples of poor financial management are: (a) Patient trust funds were not adequately maintained or accounted for, (b) Payments of Petitioner's personal expenses were made with corporate funds, some of which were included in a cost report of the Royal/Palms for purposes of Medicaid reimbursement. As a result of these financial difficulties- Royal/Palms and Lakeview each ceased operations. Melvin C. Rhodes, a former Administrator of Lakeview found 62 deficiencies assessed against Lakeview when he became administrator in November 1978 but 58 were corrected within 3 weeks and petitioner was credited by Rhodes with hiring him and cooporating with him to correct the deficiencies. During the period in which Lakeview was being closely monitored by HRS, similar inspections were being conducted by the Pinellas County Health Departments Nursing Home Section (PCHD). A Pinellas County ordinance charges the PCHD with the duty to inspect nursing homes for compliance, using HRS standards found in Rule 10D-29, Florida Administrative Code. Like HRS, PCHD cites deficiencies and sets time limits for correction. In the event of a continuing lack of compliance, the administrator or owner is asked to appear at an informal conference to determine guidelines and methods of compliance. Continued failure to comply results in action before the County Health Permit Board, for revocation of the permit. Lakeview and Royal/Palms were inspected on almost a daily basis because of failure to correct deficiencies. The types of deficiencies cited included shortage of necessary supplies, poor housekeeping, shortage of life- saving supplies, and failure to maintain a seven-day emergency food supply. Petitioner attended one such conference as a representative of the management of Lakeview. Petitioner was the person "in charge", to the understanding of the PCHD.

Recommendation Based on the Findings of Fact and Conclusions of Law recited herein, it is RECOMMENDED that the Board enter a final order DENYING Petitioner licensure as a nursing home administrator. Respectfully submitted and entered this 19th day of February, 1986, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9673 Filed with the Clerk of the Division of Administrative Hearings this 19th day of February, 1986. APPENDIX TO RECOMMENDED ORDER, CASE NO. 84-2225 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Petitioner did not number the paragraphs in his Proposed Findings of Fact but for purposes of this Appendix a number has been assigned to each paragraph. Adopted in Finding of Fact No. 1. First sentence adopted in Finding of Fact 4. Second and third sentences adopted in Finding of Fact 5. Fourth and sixth sentences adopted in Finding of Fact 6. Fifth sentence rejected as not supported by substantial competence evidence -- see Petitioner's testimony page 31, lines 16-17 and page 37, lines 11-15. First, second and third sentences adopted in Finding of Fact 17 but clarified. The fourth sentence rejected as immaterial, irrelevant and unnecessary. First and second sentences adopted in Finding of Fact 2. The third and fourth sentences rejected as immaterial, irrelevant and unnecessary. Rejected as not supported by substantial competent evidence. Rulings On Proposed Findings of Fact Submitted by the Respondent Respondent did not number the paragraphs in its Proposed Findings of Fact but for purposes of this Appendix a number has been assigned to each paragraph. Adopted in Finding of Fact No. 1. First sentence adopted in Finding of Fact 4. The second and third sentences adopted in Finding of Fact 5. Fourth sentence adopted in Finding of Fact 6. First sentence adopted in Finding of Fact 6. Second sentence adopted in Finding of Fact 5. Adopted in Finding of Fact No. 7. Adopted in Findings of Fact No. 8 and 9. Adopted in Finding of Fact 10. Adopted in Findings of Fact 10 and 11. Adopted in Finding of Fact 11. Adopted in Finding of Fact 12. Adopted in Finding of Fact 13. Adopted in Finding of Fact 14. Adopted in Finding of Fact 15. First sentence adopted in Finding of Fact 16. Second sentence rejected as not supported by substantial competent evidence. Adopted in Finding of Fact 18. First sentence rejected as immaterial. Seconds third fifth and sixth sentences adopted in Finding of Fact 19. Fourth sentence rejected as not supported by substantial competent evidence. Adopted in Finding of Fact 3 as clarified. Adopted in Finding of Fact 3 as clarified. COPIES FURNISHED: Douglas A. Mulligan, Esquire 1327 Ninth Street St. Petersburg, Florida 33705 Deborah D. Hart, Esquire Assistant Attorney General Suite 1601, The Capitol Tallahassee, Florida 32301 Salvatore A. Carpino, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mildred Gardner, Executive Director Board of Nursing Home Administrators Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 =================================================================

Florida Laws (4) 120.57468.1685468.1695468.1755
# 1
AGENCY FOR HEALTH CARE ADMINISTRATION vs ROCKLEDGE NH, L.L.C., D/B/A ROCKLEDGE HEALTH AND REHABILITATION CENTER, 02-003950 (2002)
Division of Administrative Hearings, Florida Filed:Viera, Florida Oct. 11, 2002 Number: 02-003950 Latest Update: Oct. 21, 2003

The Issue (1) Whether Respondent, Rockledge NH, L.L.C., d/b/a Rockledge Health and Rehabilitation Center, should be given a "Conditional" or "Standard" license effective February 12, 2002, or March 7, 2002; (2) Whether Respondent is subject to an administrative fine in the amount of $2,500.

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing, the following findings of fact are made: Respondent operates a skilled nursing home located at 587 Barton Boulevard, Rockledge, Brevard County, Florida. Petitioner is the State of Florida agency responsible for licensure and regulation of nursing home facilities in Florida. Respondent was, at all times material to this matter, licensed by Petitioner and required to comply with applicable rules, regulations, and statutes, including Sections 415.1034 and 400.022, Florida Statutes. On or about March 7, 2002, Petitioner conducted a complaint survey of Respondent. Petitioner's surveys and pleadings assign numbers to residents in order to maintain the residents' privacy and confidentiality. The resident who was the subject of the Class II deficiency from the March 7, 2002, complaint survey has been identified as Resident number 1, with the initials "H.C." Resident number 1 is 82 years old and was admitted to Respondent's facility on January 19, 2002, with diagnoses of dementia, back pain from multiple falls, hypertension, osteoarthritis, recurrent bronchitis, and chronic obstructive pulmonary disease. At all times material to this matter, Resident number 1 was a "vulnerable adult" as defined in Subsection 415.102(26), Florida Statutes. On February 5, 2002, at approximately 9:50 p.m., a certified nursing assistant employed by Respondent went into Resident number 1's room to see why Resident number 1 was yelling. Upon entering the room, the certified nursing assistant found Resident number 1's bed positioned in such a way that his head was down and his feet were up. A blanket had been tied across the "up" end of the bed securing Resident number 1's feet allowing him to be held in a "head down" position. The certified nursing assistant who investigated the yelling "pulled on the blanket to verify that it was tied down." There were no prescriptions or written orders justifying the restraint of Resident number 1. The certified nursing assistant who found Resident number 1 in the above-described position identified a different certified nursing assistant, one provided to Respondent by a staffing agency, as the caregiver for the shift in question. The alleged abusive act was perpetrated by the certified nursing assistant provided by the staffing agency. The certified nursing assistant provided by the staffing agency placed Resident number 1 in a position that was contraindicated for a person with a diagnosis of chronic obstructive pulmonary disease. Respondent's certified nursing assistant waited approximately two days before reporting the alleged abusive act to the abuse hotline, Respondent's abuse coordinator or the Director of Nursing. A medical record review indicated that Resident number 1 was sent to the hospital on February 22, 2002, for shortness of breath and again on February 26, 2002, for difficulty in breathing and lung congestion. The History and Physical from the hospital, dated February 23, 2002, revealed that Resident number 1 was sent to the hospital because of progressive shortness of breath. Resident number 1's lower extremities were documented to have been severely edematous with "skin changes subsequent to chronic stasis and edema with excoriation, loss of circulation, blisters, etc." The certified nursing assistant provided by the staffing agency had a full resident assignment and cared for several residents the day of the alleged abusive act. After the discovery of the alleged abuse, the certified nursing assistant provided by the staffing agency continued to care for Resident number 1 and other residents assigned to her for approximately one hour or until the end of her shift. Documentation, dated March 8, 2002, from the staffing agency, confirmed that the certified nursing assistant provided by the staffing agency did have education in the current rules and regulations related to the abuse and neglect of the elderly. Petitioner's surveyor believed that the failure to immediately report the alleged abuse constituted a Class II deficiency because the certified nursing assistant provided by the staffing agency was allowed to continue to care for Resident number 1 and other residents until the shift ended and could have further abused Resident number 1 or other residents in her care.

Recommendation Based on the Foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Administrative Complaints in this matter be dismissed and Respondent's licensure status be returned to Standard for the period it was Conditional and that no administrative fine be levied. DONE AND ENTERED this 18th day of February, 2003, in Tallahassee, Leon County, Florida. JEFF B. CLARK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 18th day of February, 2003. COPIES FURNISHED: Joanna Daniels, Esquire Agency for Health Care Administration 2727 Mahan Drive, Mail Stop 3 Tallahassee, Florida 32308 Alex Finch, Esquire Goldsmith, Grout & Lewis, P.A. 2180 North Park Avenue, Suite 100 Post Office Box 2011 Winter Park, Florida 32790-2011 Lealand McCharen, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive, Mail Stop 3 Tallahassee, Florida 32308 Valda Clark Christian, General Counsel Agency for Health Care Administration 2727 Mahan Drive Fort Knox Building, Suite 3431 Tallahassee, Florida 32308

Florida Laws (11) 120.569120.57400.022400.102400.121400.23415.102415.103415.1034415.111415.1111
# 2
LAURENCE ARTHUR BAIRD vs BOARD OF NURSING HOME ADMINISTRATORS, 93-004844 (1993)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Aug. 23, 1993 Number: 93-004844 Latest Update: Mar. 24, 1994

The Issue The basic issue in this case is whether the Petitioner, Laurence Arthur Baird, is entitled to be licensed by endorsement as a Nursing Home Administrator.

Findings Of Fact On March 3, 1993, the Petitioner, Laurence Arthur Baird, filed his application for licensure by endorsement to sit for the Nursing Home Administrators examination and subsequently to be licensed as a Nursing Home Administrator by the Board of Nursing Home Administrators. The application was complete and was timely filed. The appropriate fee was paid. Mr. Baird holds current active licenses to practice as a Nursing Home Administrator in Georgia and Illinois. Mr. Baird has a high school diploma. In addition, Mr. Baird completed over four semesters at Milliken University. He has also secured additional hours at Jacksonville University, has received CLEP credit in five course areas, and has secured a number of continuing education hours in areas relative to nursing home administration. He has spent over 600 hours in continuing education since his initial licensure. He also passed the GMAT examination which is a prerequisite to admission to many M.B.A. programs. The University of Alabama considered Mr. Baird's undergraduate career, his CLEP scores, his GMAT score, and his life experiences and concluded that Mr. Baird was qualified for graduate studies in its M.B.A. program. Mr. Baird completed 42 hours toward an M.B.A. degree. Mr. Baird has formal education in the following areas: Nursing Home Administration; including planning, organization, operations and services, resource development, supervision of staff, and control and evaluation of facility performance. Personnel Management; including managing people for the specific needs of the long-term care facility, recruitment and selection, orientation, training and development of employees, development of employee appraisal programs, communications, wage and salary administration, union procedures and employee-management relations, discipline and morale. Accounting and Financial Management; including basic accounting, adjustment of accounts, preparation of financial statements, financial management planning, effective use of resources, financial performance evaluation, cost analysis, reimbursement from the United States Department of Health and Human Services under Medicare and Medicaid, and budgeting. Social Gerontology; including biology of aging, psychology of aging, changing social roles of aging, personal adjustment to aging, programs for health improvement and rehabilitation, financial aspects of aging, retirement, independency and dependency of aging persons, societal disengagement, impact of living arrangements and interaction between the needs of the institution and the needs of the patients. Mr. Baird has practiced as a Nursing Home Administrator since 1970. Mr. Baird has attained many years of experience in all of the areas mentioned immediately above. A review of Mr. Baird's work experience includes the following details: In 1970 Mr. Baird participated in and fully completed an AIT program. He then became assistant administrator at a facility in Decatur, Georgia. From 1970 to 1972 he was administrator of a 102-bed facility in Champaign, Illinois. From 1972 to 1977 Mr. Baird was administrator of a 165-bed facility. During that time the company built a second 65-bed facility and Mr. Baird oversaw both. From 1977 to 1988 Mr. Baird was administrator of a 209-bed facility. In 1979 Mr. Baird purchased a 65-bed facility and, until its sale in 1987, oversaw both of them. In 1988, Mr. Baird took the position of Director of Operations at Pruitt Corporation. Initially, he was responsible for the operation of 17 nursing home facilities. He was promoted to Vice President of Operations and, later, to Senior Vice President of Operations. At the time he left Pruitt, he was responsible for 30 facilities. He resigned from Pruitt to move his family to Florida to take a position at Beacon Pointe in Sunrise. During the last five years he was with Pruitt, he acted in the capacity of administrator for at least two years. Mr. Baird has distinguished himself as a Nursing Home Administrator by being nominated for Nursing Home Administrator of the year in 1976 in Georgia and by winning the equivalent award in Alabama in 1984. For five years Mr. Baird served on a board in the State of Alabama which advised the state on nursing home licensure matters. He chaired that board for one year. He also served three years on a Georgia advisory board on Medicaid. Mr. Baird is a member of the American Academy of Nursing Home Administrators. He has been certified as an administrator by that body, after passing a rigorous two-day examination. He served as the regional governor of the American Academy of Nursing Home Administrators. Mr. Baird has successfully completed a national examination which is substantially equivalent to the examination given by the department. Mr. Baird has worked as a fully licensed Nursing Home Administrator for two years within the five year period immediately preceding the application by endorsement. The Board's Order of Denial filed on July 9, 1993, included the following pertinent language: The Board of Nursing Home Administrators reviewed and considered your application for licensure by endorsement on May 14, 1993, in Miami, Florida and has determined that said licensure be denied, stating as grounds therefore: Your application and supporting documentation do not evidence that the licensure requirements for Georgia or Illinois are substantially equivalent to those in Florida. In the State of Georgia the rules and regulations governing qualifications for licensure as a Nursing Home Administrator include the following: 393-3-.01 Pre-Examination Requirements. Amended. A person who seeks licensure by examination as a nursing home administrator must show the following: be at least 21 years of age; be of reputable and responsible character; and meet one of the following education and experience requirements: Have earned a master's degree in Nursing Home Administration, in Health Care Administration or in a related health care administration field from an accredited institution of higher learning. If the master's degree did not include an Administrator-In-Training (AIT) program as provided in Rule 393-4-.04, the applicant must either have completed an AIT program as provided in Chapter 393-4 or the applicant must have attained two years of employment working in a nursing facility. Have earned a baccalaureate degree from an accredited institution of higher learning and have completed AIT program as provided in Chapter 393-4; or earned a baccalaureate degree from an accredited institution of higher learning and have attained two years of employment working in a nursing facility. With less than a baccalaureate degree, the applicant must have either: 3 years of college plus 2 years of full time work experience; 2 years of college plus 4 years of full time work experience; 1 year of college plus 6 years of full time work experience; or a High School Diploma or GED certificate plus 8 years of full time work experience; provided that: One year of college means 45 quarter hours or 24 semester hours of course work at an accredited institution of higher learning; and Full time work experience means a minimum of 35 hours per week in a licensed nursing facility. In the State of Illinois the statutory provisions governing qualifications for licensure as a Nursing Home Administrator include the following: 70/8. Qualifications Sec. 8. A person is qualified to receive a license as a nursing home administrator: (a) who is at least 21 years of age, (b) who has not engaged in conduct or behavior determined to be grounds for discipline under this Act, (c) who is in sound physical and mental health, (d) who is a citizen of the United States or lawfully admitted alien, (e) who is a graduate of a college or university deemed reputable and in good standing by the Department, or who has satisfactorily completed a course of instruction approved by the Department containing subjects embracing the laws governing the operation of nursing homes, the protection of the health and safety of patients in nursing homes and the elements of sound nursing home administration, or who presents evidence to the Department of education, training and experience deemed by the Department to be equivalent of either of the above, (f) who passes a written examination conducted by the Department to determine his fitness to receive a license as a nursing home administrator and (g) who pays the required fee. The Illinois Administrative Code includes the following requirements at Section 1310.30(a)(2) regarding the contents of applications for licensure as a Nursing Home Administrator: (a) An applicant for a license as a nursing home administrator shall file an application on forms supplied by the Department . . . together with: (1) *** Certified records of any one of the following: Graduation from an accredited college or university with the minimum of a Baccalaureate Degree; Satisfactory completion of an approved course of instruction in nursing home administration as outlined in Section 1310.40; or Graduation from an accredited college or university with the minimum of an Associate Degree and an Employer's Affidavit certifying to the applicant's qualifying experience as described in Section 1310.50. The types of courses that may be approved for satisfaction of the requirements of Section 1310.30(a)(2)(B), above, are described as follows at Section 1310.40 of the Illinois Administrative Code: The Department, upon the recommendation of the Nursing Home Administrators Licensing Board, shall approve courses of instruction in nursing home administration which include instruction in the following areas: Nursing Home Administration; including planning, organization, operations and services, resource development, supervision of staff, and control and evaluation of facility performance. Personnel Management; including managing people for the specific needs of the long- term care facility, recruitment and selection, orientation, training and development of employees, development of employee appraisal programs, communications, wage and salary administration, union procedures and employee-management relations, discipline and morale. Accounting and Financial Management; including basic accounting, adjustment of accounts, preparation of financial statements, financial management planning, effective use of resources, financial performance evaluation, cost analysis, reimbursement from the United States Department of Health and Human Services under Medicare and Medicaid, and budgeting. Social Gerontology; including biology of aging, psychology of aging, changing social roles of aging, personal adjustment to aging, programs for health improvement and rehabilitation, financial aspects of aging, retirement, independency and dependency of aging persons, societal disengagement, impact of living arrangements and interaction between the needs of the institution of [sic] the needs of the patients. The types of qualifying experience that will satisfy the experience requirements of Section 1310.30(a)(2)(C) are described as follows in Section 1310.50 of the Illinois Administrative Code: Qualifying experience for applicants . . . shall include: One year of full time employment as a nursing home administrator in a licensed nursing home or two years of full time employment as an assistant nursing home administrator in a licensed nursing home with 50 or more beds. Experience as a nursing home administrator or as the assistant nursing home administrator must have been completed within the 36 months immediately preceding date of application. Full time employment as an administrator of a related facility for two years or more. Related facilities include hospitals with long term care beds or other licensed long-term care facilities not having nursing care beds licensed by the Illinois Department of Public Health. Experience as an assistant administrator in such a facility shall not qualify.

Recommendation Based on all of the foregoing, it is RECOMMENDED that the Board of Nursing Home Administrators issue a Final Order in this case concluded that the Petitioner is not entitled to licensure by endorsement as a Nursing Home Administrator. DONE AND ENTERED this 8th day of November 1993 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of November 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-4844 The following are the Hearing Officer's specific rulings on all proposed findings of fact submitted by all parties. Proposed findings submitted by Petitioner: Paragraph 1: Accepted. Paragraph 2: Rejected as consisting primarily of subordinate and unnecessary background and procedural details. Paragraph 3: Accepted. Paragraph 4: Accepted in substance with the exception of the portion reading "which gave him more than the requisite number of hours necessary to secure an A.A. Degree." The quoted portion is rejected as irrelevant in the absence of evidence that the Petitioner's courses at Milliken satisfied the subject matter requirements for an Associate of Arts degree. Paragraphs 5 through 12: Accepted in substance with the exception of a few repetitious observations. Proposed findings submitted by Respondent: All of the proposed findings of fact submitted by the Respondent have been accepted in whole or in substantial part. COPIES FURNISHED: Karen L. Goldsmith, Esquire Goldsmith & Grout, P.A. 2709 West Fairbanks Avenue Post Office Box 2011 Winter Park, Florida 32790-2011 Arthur R. Wiedinger, Esquire Assistant Attorney General Office of the Attorney General The Capitol, Plaza Level 01 Tallahassee, Florida 32399-1050 Anna Polk, Executive Director Board of Nursing Home Administrators Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0777 Jack McRay, Acting General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (3) 120.57468.1695468.1705
# 3
MAPLE LEAF OF LEE COUNTY HEALTH CARE, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-000693 (1987)
Division of Administrative Hearings, Florida Number: 87-000693 Latest Update: Nov. 22, 1988

The Issue Whether the Department of Health and Rehabilitative Services should approve the application for certificate of need (CON) of any one or more of five applicants for community nursing home beds in Lee County for the July 1989 planning horizon.

Findings Of Fact The Applicants Applications for certificates of need (CON) for nursing homes are accepted by the Department of Health and Rehabilitative Services (Department) in batching cycles and are subject to competitive review. The Department comparatively reviewed and analyzed 13 individual applications for proposed nursing services for District VIII, Lee County, in the July, 1986 nursing home batching cycle. Five of those applications are at issue for purposes of this proceeding. Pertinent to this proceeding, petitioner, Maple Leaf of Lee County Health Care, Inc., a wholly owned subsidiary of Health Care and Retirement Corporation of America (HCR filed an application for a 120-bed nursing home (CON 4746), petitioner Forum Group, Inc. (Forum), filed an application for a 60-bed nursing home (CON 4755), petitioner, Health Quest Corporation (Health Quest), filed an application for a 60-bed nursing home (CON 4747), petitioner, Hillhaven, Inc., d/b/a Hillhaven Health Care Center Lee County (Hillhaven) filed an application for a 120-bed nursing home (CON 4756), and respondent, Gene Lynn d/b/a Careage Southwest Healthcare Center (Careage) filed an application for a 120-bed nursing home (CON 4748). Each of these applications was timely filed. The Department's "preliminary" action The Department is the state agency charged with implementing and regulating the CON program for medical facilities and services in Florida. Within the Department, the Office of Community Medical Facilities is responsible for the review of CON applications and provides a recommendation for approval or disapproval after its analysis is concluded. The Department assigned the subject District VIII applications for the July, 1986 hatching cycle to Medical Facilities Consultant Robert May for review. Mr. May was supervised in his work by Elizabeth Dudek, an experienced Medical Facilities Consultant Supervisor, who has reviewed or supervised the review of approximately 1200 CON applications. Robert Nay and Elizabeth Dudek concurred in their evaluations of the applications and recommended that Hillhaven's application be approved for 60 beds in Lee County. This recommendation was forwarded to the Administrator of the Office of Community Medical Facilities, Robert E. Naryanski, who also occurred with the recommendation on or about December 20, 1986, and forwarded the recommendation to Marta Hardy, Deputy Assistant Secretary for Health Planning and Development, for final approval. An unusual set of circumstances evolved from that approximate point in time with respect to the applications at issue. Sometime in late November 1986 Marta Hardy talked to Robert Sharpe, Administrator of the Office of Comprehensive Health Planning, concerning the applications in this batching cycle and stated that she intended to involve him in the review procedure. In late December, she asked Mr. Sharpe to review the applications for four of the counties in the cycle, including Lee County. Mr. Sharpe is in a separate and distinct part of the Department, which reports to the Deputy Assistant Secretary but does not, in the ordinary course of operations, review certificate of need applications. Mr. Sharpe's involvement with reviewing nursing home applications had never occurred before and has not occurred since. However, Mr. Sharpe has been involved on limited occasions with reviewing hospital CON applications in preparation for administrative hearings. Careage had a CON application in each of the four districts that Mr. Sharpe was asked to review. Mr. Sharpe was not asked to review any other districts other than the four districts in which Careage had applications pending. In Mr. Sharpe's conversation with Ms. Hardy, Ms. Hardy specifically mentioned Careage while expressing her concern about the Department's ability to discriminate the best applicants on the basis of quality of care. Ms. Hardy mentioned no other applicant by name. Mr. Sharpe, in all circumstances, recommended Careage for approval. Mr. Sharpe did not attempt to do a complete re-review the applications, and did not redo any part of the review that had been performed by the Office of Community Medical Facilities specifically the need calculations and comparing the applications to the statutory review criteria. Mr. Sharpe did not apply statutory review criteria in his review of the applications because it had been determined that all the applicants were minimally qualified and met the statutory review criteria. Mr. Sharpe felt that the responsibility of his office was simply to do a comparative review to determine the best applicant. Mr. Sharpe placed information in the applications into what has been termed a "matrix." The purpose of the matrix was to present the information in the applications in a format which would facilitate a comparative analysis based on a greater number of factors than had previously been considered. Traditionally, the predominant factors utilized by the Department in reviewing applications were construction costs, Medicaid participation percentages, proposed sites, and charges. The matrix developed by Mr. Sharpe included additional factors which he felt would better address the quality of care to be provided, such as the size of facility, the size of the patient rooms, the amenities available to the patients and their families, the type and level of staffing, availability of special programs, and operating costs. By including a greater number of factors in the matrix, more information was considered in selecting the best applicant. As a result, the factors that traditionally had been considered by the Department were given relatively less weight. There was no notice to the applicants of this change in practice. Further, although all the information considered by Mr. Sharpe was taken from the applications and generally required to be in the application, the applicants reported the information differently, making a direct "apples-to-apples" comparison difficult. Mr. Sharpe's review of the applications spanned approximately five to eight days. Mr. Sharpe's staff in the information on the matrix from the applications, and, although Mr. Sharpe had personally reviewed all the applications, Mr. Sharpe did not personally check the information placed on matrix for accuracy. The Office of Community Medical Facilities' initial review covered a period of approximately six months. There was no evidence that the duties and responsibilities of the Office of Community Medical Facilities were not carried out in a thorough and appropriate manner. Ms. Dudek has more experience in reviewing CON applications than Mr. Sharpe, and she took into account, among other review criteria requirements, the type programs offered by the applicant and the quality of care the applicant had demonstrated and was capable of providing. Mr. Sharpe never talked to Ms. Dudek to find out the basis for her recommendation because he felt his responsibility was to do an independent review. Robert Sharpe reported his findings with regard to Lee County to Marta Hardy who apparently accepted Mr. Sharpe's recommendation on or about January 7, 1987, approving Careage's application for 60 beds and denying all others. On or about January 23, 1987, in the Florida Administrative Weekly, it was published that Careage was approved fob a 120-bed facility in Lee County. Actually HRS approved Careage for a 60-bed facility; the 120-bed figure in the Florida Administrative Weekly was erroneous. As a result of a new administration and Bob Griffin succeeding Ms. Hardy as Deputy Secretary in the Office of Health Planning, and due to his concerns about the unique manner in which these applications were reviewed and a decision made, another review of the applications for Lee County was conducted. The Office of Community Medical Facilities, the office originally responsible for reviewing the applications, was asked to do this review. This third review was conducted during the summer of 1987 by Bob May while this case was pending before the Division of Administrative Hearings. In this third review, a matrix was also used, but not the identical matrix previously used by Mr. Sharpe. Indeed, the Office of Community Medical Facilities was instructed not to look at what Mr. Sharpe's office had done. The review resulted in a decision that HRS would maintain its position of supporting partial approval of the Careage application for 60 beds. By letter dated September 4, 1987, the parties were formally notified of the HRS decision and a Correction Notice was published in the Florida Administrative Weekly indicating that the notice published in January, 1987, stating that Careage had received a CON for 120 beds, should have shown a partial approval of 60 beds, and a denial of 60 beds. HCR, Forum, Health Quest and Hillhaven timely contested initial approval of the Careage application and their own respective denials. Careage and HRS are the respondents. Hillhaven, prior to final hearing, dismissed its case contesting the Careage approval for 60 beds, and in this proceeding contends that Hillhaven should be awarded a certificate of need because there is a bed need in excess of 60 beds in Lee County. Careage did not timely contest the denial of the 120 beds requested in its original application. Health Care and Retirement Corporation of America HCR, through its wholly owned subsidiary, Maple Leaf of Lee County Health Care, Inc., proposes to construct a 120-bed community nursing home in Lee County, Florida. At the time its application was submitted, HCR had not selected a site on the proposed facility, but at hearing proposed to locate it in the Ft. Myers area. Currently, HCR owns and operates 92 nursing homes in 19 different states, including seven within the State of Florida. Its existing Florida facilities are Pasadena Manor Nursing Home (South Pasadena, Florida), Community Convalescent Center (Plant City Florida), Kensington Manor (Sarasota, Florida), Jacaranda Manor (St. Petersburg, Florida) Wakulla Manor (Crawfordville, Florida, Heartland of St. Petersburg (St. Petersburg, Florida, and Rosedale Manor (St. Petersburg, Florida). Each of these facilities received superior ratings on their latest licensure and certification survey with the exception of Heartland and Rosedale, which received a standard and conditional rating respectively. Significantly, the conditional rating assigned to the Rosedale facility occurred less than six months after that facility was acquired by HCR, and all deficiencies were corrected within 19 days of the survey. HCR's current proposal for a 120-bed facility will be a one-story structure containing 40,000 gross square feet, including 2,000 square feet for an ancillary adult day care center. It will have 58 semi-private rooms with half-bath (toilet and sink) and four private rooms with full bath (toilet, sink and shower) located within four patient wings, two nursing stations, two dining rooms, central bathing facilities, beauty- barber shop, quite lounge, physical therapy room, occupational therapy room, multi-purpose rooms, outdoor patio areas and the other standard functional elements required to meet licensure standards. In all, the proposed facility meets or exceeds state requirements for the construction of nursing homes. HCR proposes to dedicate one wing (14 semi-private and 1 private room) of its facility to the care of patients suffering from Alzheimer's Disease and related disorders. Alzheimer's Disease is a brain disorder that results in gradual memory loss and, as such loss progresses, a need for increased personal care. Historically, Alzheimer's patients have been mixed with other patients in nursing homes, often disrupting other patients and presenting problems of control for staff separate Alzheimer's care unit enables the nursing home to utilize special techniques to manage the patient without restraint or sedation, and provides the patient with a smaller, safer and specially designed area with specially trained staff to address the needs of such patients. However, absent fill-up, HCR does not propose to limit admission to its Alzheimer's unit solely to patients suffering from Alzheimer's disease and related disorders. HCR's Alzheimer's unit is reasonably designed, equipped and minimally staffed for its intended purpose. HCR also proposes to provide, as needed, subacute care at its facility. Due to the impacts of the federal DRG (diagnostically related group) system which encourages hospitals to discharge patients earlier, there has been an increased demand for subacute services in nursing homes. Included within the subacute services HCR proposes to offer are ventilator care, IV therapy, pulmonary aids, tube feeding, hyperalimentation, and percentage and long term rehabilitation. HCR currently provides a wide variety of such subacute services at its existing facilities, and it may reasonably be expected to continue such practice at the proposed facility. As an adjunct to the proposed nursing home, HCR proposes to operate an adult day care unit for 12 Alzheimer's Disease patients. Additionally, HCR will offer respite care within the nursing home when beds available. Adult care and respite care provide alternatives to institutional long-term care in nursing homes, aid in preventing premature rising home admissions, and promote cost containment. As initially reviewed by the Department, HCR's activity would be a single story building containing 40,000 gross square feet, including the day care area, with an estimated total project cost of $3,894,000. As proposed, the total project cost equates to $32,450 per bed, and as designed provides 127 net square feet of living space for private rooms and 166 square feet for semi- private rooms. Construction equipment costs were as follows: Construction costs $2,200,000; costs per square foot $55.00; construct cost per bed 17,417; equipment costs $420,000; and equipment cost per bed $3,500. HCR's estimate of project costs is reasonable. At hearing HCR updated its project costs to account for changes that arose during the delay between initial review and de novo hearing. As updated, the total project cost was $4,375,500, or $36,462 per bed. Construction equipment costs, as updated were as follows: construction costs $2,400,000; cost per square foot $60.00; construction cost per bed $19,000, equipment costs $420,000; and equipment cost per bed $3,500. HCR's updated estimate of cost is reasonable. Staffing at the proposed 120-bed facility is designed to accommodate the needs of the skilled and intermediate care patients, as well as the special needs of the Alzheimer's and subacute patients. HCR will provide 24-hour registered nurse coverage for subacute patients and a higher staffing level in the Alzheimer's unit. The nursing home will provide 3.59 hours per patient in the Alzheimer's unit and 2.73 nursing hours overall, based on the assumption that 50 percent of the Alzheimer's patients will wanderers and that 50 percent of all patients will require skilled care. Precise staffing for subacute patients will be determined by the nature of the subacute services needed. HCR's staffing levels, as originally proposed and as updated, meet or exceed state standards. The salary and benefit estimates provided by HCR in its original application reflect salary and benefit levels current at the time of application, and the salary and benefit projections provided by HCR at bearing reflect current (1987) salaries and benefits inflated to the date of opening. Both estimates are reasonable. HCR's projection of utilization by class of pay as initially proposed was as follows: Private pay 51 percent, Medicaid 46 percent, and Medicare 3 percent. Due to its experience over the intervening 17 months since submittal of its application, HCR updated its assessment of utilization as follows: Private pay 50 percent, Medicaid 46 percent, and Medicare 4 percent. The current Lee County Medicaid experience level is 46 percent, and HCR provides an average 71 percent Medicaid occupancy in its Florida facilities. HCR's projections for payor mix are reasonable. HCR's initial application contained estimates of expenses and revenues current as of the date of application (July 1986) but failed to include an inflation factor to accommodate anticipated increases in expenses and revenues. Initially, T. projected its per diem room charges to be $60 to $85. At hearing, HCR projected its per diem room charges in the year opening (1990) to be $90 for a private room, $75 for a semiprivate room, $76.00 for Medicare patients, and $72 for Medicaid patients. The private, semi-private and Medicare charges were determined by inflating current (1987) Lee County charges forward to the year of opening. The Medicaid charges were based on a calculation of the Medicaid reimbursement formula. These charges, when multiplied by patient days, are a reasonable estimate of the projected revenues of the facility. HCR's estimate of expenses in its initial application was based on its current experience. Intervening events have lent new insight to its evaluation of expenses, as have intervening inflationary factors. While HCR's estimate of expenses and revenues was reasonable in its initial application, its current estimates comport with the reality of a 1990 opening and are reasonable. HCR has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other personnel necessary to staff its facility. Since HCR does not propose to initially limit admission to its Alzheimer's unit solely to patients suffering from Alzheimer's disease and related disorders, its pro formas are premised on reasonable assumptions, and it has demonstrated the financial feasibility project in both the short term and long term. The proof demonstrates that HCR provides and Bill continue to provide quality care. HCR's corporate standards and guidelines regulate such areas as patient rights, staff development and orientation, physician and nurse services, pharmacy services and medication administration, social services, and infection control. HCR's manager of quality assurance, house professional services consultants, and quality assurance consultants regularly visit each HCR nursing home to implement the quality assurance standards and guidelines. Each HRC nursing home provides a staff development director who is responsible for the orientation of new employees, training new employees, and continuing training for all employees. Forum Group Inc. Forum is a publicly held health services company which owns, develops and operates retirement living centers and nursing homes on a national basis. Currently Forum operates 22 Lang facilities and an additional 11 retirement living centers with attached nursing facilities, including one nursing facility in Florida. Its Florida facility holds a standard rating. Other facilities owned by Forum in Texas, Kentucky and Illinois do, however, hold superior ratings. Pertinent to this case, Forum proposes to develop a retirement living center in Lee County that would consist of its proposed 60-bed skilled and intermediate care nursing home, an adult congregate living facility, and apartments or Independent living. Each of the three components which comprise Forum's retirement living center are physically connected and share some operational functions, such as a central kitchen, laundry, administrative area and heating plant. Such design provides for an efficient operation, as well as an economical distribution costs facility wide. The nursing facility proposed by Forum will be a single story building of wood frame and brick veneer construction containing 27,000 gross square feet. It will include 20 semi- private rooms with half bath, 16 private rooms with half bath, 3 private rooms with full bath, and one isolation room with full bath. Also included are a beauty-barber shop, quite lounge, physical therapy room, occupational therapy room, and exam-treatment room. But for the length of the corridors in the patient wings, discussed infra, the proposed facility meets or exceeds state requirements for the construction of nursing homes. Forum's proposal, as initially reviewed by the Department, would have a total project cost of $2,314,800. This equates to $38,580 per bed, and as designed provides 150 net square feet of living space for private rooms and 228 net square feet for semi-private rooms. Construction equipment costs were as follows: Construction costs $1,377,000; cost per square foot $51.00; construction cost per bed $22,950; equipment costs $200,000; and equipment costs per bed $3,333. Forum's estimate of project cost is reasonable. Forum provided a single-line drawing indicating the general arrangement of spaces for its proposed facility. As proposed, the facility would consist of two patient wings, and a central nurse's station. The corridor lengths in the patient wings exceed state standards by 40 feet. They could, however, be modified to conform to State standards without significantly affecting the cost of construction. The project would have energy conservation features such as heavy duty roof and side insulation, double-glazed windows, and high efficiency heating and air conditioning equipment. The forum facility will offer skilled and intermediate care, and subacute care, including IV therapy, ventilator care, hyperalimentation, pulmonary aids, and short and long term rehabilitation. Forum would contract out for physical therapy, speech therapy, pharmacy consultation and a registered dietician. If needed, Forum would offer respite care when beds are available. The proposed staffing levels and salaries proposed by Forum in its application are reasonable and meet or exceed state standards. Forum has a staff training program, with pre-service and in-service training, and utilizes a prescreening procedure to assure it hires competent staff. Twenty-four hour coverage by registered nurses will be provided, and a staffing ratio of 2.9 will be maintained. The staffing level at the proposed facility is consistent with that experienced at Forum's existing Florida Facility. Forum provides, and will continue to provide, quality care. Forum's application projected its utilization by class of pay as follows: private pay 58.47 percent, Medicaid 37.16 percent, and Medicare 4.37 percent. Currently, Forum experiences a 48 percent Medicaid occupancy rate system-wide, although it only has 2 of 35 beds dedicated to Medicaid care in its present Florida facility. Forum estimated its revenues based on patient charges ranging from $50.64 per day for Medicaid/semi-private room to $75.00 per day for SNF/private pay/private room. Based on such revenues, its pro forma, utilizing a conservative 86.25 percent occupancy rate at the end of the second year of operation, demonstrated the short term and long term financial feasibility of the project as initially reviewed by the Department notwithstanding the fact that it had underestimated its Medicaid and Medicare reimbursement rates. At hearing, Forum sought to demonstrate that its project was currently feasible by offering proof that intervening events had not significantly impacted the financial feasibility of its project. To this end, Forum offered proof that the contingencies and inflation factors it had built into the construction of its initial proposal would substantially offset any increased costs or expenses of construction. Additionally, Forum sought to update its proposal at hearing by offering testimony that included an increase in the administrator's salary from $27,000 to $39,000, a decrease in interest in year one to $187,803, an increase in interest in year two to $250,790, and an increase in revenues based on patient charges ranging from $69.19 per day for Medicaid/semi private room to $90.00 per day for SNF/private pay/private room. Some of the applicants objected to Forum's proof directed at the current financial feasibility of its project because it had not previously provided them with a written update of its application as ordered by the Hearing Officer. The applicants' objection was well founded. Further, the proof was not persuasive that any contingencies and inflation factors it had built into its initial proposal would substantially offset any increased costs or expenses of construction, nor that salaries, benefits and other expenses that would be currently experienced were appropriately considered in addressing the present financial feasibility of Forum's project. While Forum has the available resources, including management personnel and funds for initial capital and operating expenditures, for project accomplishments and operation, and will be able to recruit any other personnel necessary to staff its facility, it has failed to demonstrate that its proposal, as updated, is financially feasible in the long term. Health Quest Corporation Health Quest is a privately held corporation which owns, develops and operates health care facilities and retirement centers on a national basis. Health Quest has been in business for approximately 20 years, and currently operates 11 long-term care facilities and three retirement centers in Indiana, Illinois, and Florida. Its existing Florida facilities are located in Jacksonville, Boca Raton, and Sarasota. It also has facilities under construction in Winter Park and Sunrise, Florida. Health Quest also held a number of other certificates of need to construct nursing facilities in Florida. Recently, however, it decided to transfer or sell 3-4 of those certificates because its initial decision to develop nine new projects simultaneously would have, in its opinion, strained its management staff and commitment to high quality standards. HCR is, however, currently proceeding with several projects in Florida, and anticipates that the proposed Lee County facility will be brought on line thereafter. Pertinent to this case, Health Quest proposes to develop a retirement center in Lee County that would consist of a 60-bed skilled and intermediate care nursing home, and 124 assisted living studio apartments (an ACLF). 4/ The two components which comprise Health Quest's retirement center are physically connected and share some operational functions such as a common kitchen, laundry, therapy areas, maintenance areas, and administrative areas. Such design provides for an efficient operation, as well as an economical distribution of costs facility wide. In addition to providing an economical distribution of costs, the two components of the retirement center are mutually supportive. The nursing care unit supports the ACLF by making sure that health care services are available to the assisted living people. The ACLF supports the nursing unit as a source of referral and as an alternative to nursing home placement. The nursing facility proposed by Health Quest will be a single story building of masonry and concrete construction. It will include 6 private rooms and 27 semi-private rooms with half-bath attached, central nurse's station, central bathing facilities, beauty-barber shop, quite lounge, central dining area, physical and occupational therapy room and outdoor patio The center, itself, will provide patios, walkways and other outdoor features to render the facility pleasant and attractive, and will provide multi-purpose areas to be used for religious services and other activities, an ice cream parlor and gift shop. As proposed, the nursing home meets or exceeds state standards. As initially reviewed by the Department, Health Quest's proposed facility contained 25,269 gross square feet, with an estimated total project cost of $2,244,505. As proposed, the total project cost equates to $37,408 per bed, and as designed provides 240 net square feet of living space for both private and semi-private rooms. Construction equipment costs were as follows: Construction costs $1,470,333; cost per square foot $58.19; construction cost per bed $24,506; equipment costs $298,200; and equipment cost per bed $4,970. While the majority of Health Quest's costs are reasonable, its equipment costs are not. These costs are substantially the same as those projected in its original application for a 120-bed facility, which at an equipment cost of $300,000 derived an equipment cost per bed of $2,500. Why the same cost should prevail at this 60-bed facility was not explained by Health Quest, and its equipment cost per bed of $4,970 was not shown to be reasonable. As with most applicants, Health Quest updated its project costs at hearing to account for the changes which were occasioned by the delay between initial review and de novo hearing. As updated, the estimated project cost is $2,290.331, $38,172 per bed. Construction equipment costs were as follows: Construction costs $1,507,043; cost per square foot $59.64; construction cost per bed $25,117; equipment costs $302,700; and equipment costs per bed $5,045. Again, while the majority of Health Quest's costs are reasonable its equipment costs are, for the reasons heretofore expressed, not shown to be reasonable. The Health Quest facility will offer skilled and intermediate nursing care, and subacute care, including IV therapy, chemotherapy, TPN therapy and tracheostomy care. Also to be offered are respite care as beds are available and, within the complex, adult day care. Health Quest will maintain a nursing staffing ratio of approximately 3.25 hours per patient day for skilled care and 2.5 for intermediate care. As originally reviewed by the Department, Health Quest's staffing levels and expenses were reasonable. At hearing, Health Quest increased its staffing levels to account for an increased demand in labor intensive care, and increased its staffing expenses to account for the intervening changes in the market place. As updated, Health Quest's staffing levels and expenses are reasonable. Health Quest's projection of utilization by class of pay in the application reviewed by the Department was as follows: private pay 51.6 percent, Medicaid 45 percent, and Medicare 3.4 percent. Health Quest's utilization projection, as updated at hearing, was as follows: private pay 50.9 percent, Medicaid 45 percent, and Medicare 4.1 percent. TAB Health Quest currently serves 30 percent Medicaid patients at its Jacksonville facility, 10 percent Medicaid patients at its Boca Raton facility, and no Medicaid patients at its Sarasota facility. It has, however, committed to serve 40 percent and 48 percent Medicaid patients at its Sunrise and Winter Park facilities, respectively. Health Quest's projections of payor are reasonable. Initially, Health Quest projected its per diem room charges to range from $52 for skilled and intermediate care Medicare patients to $57.25 for skilled care-private and Medicare patients. It did not, however, draw any distinction between private and semi-private rooms. At hearing, Health Quest projected its per diem room charges as follows: $90 for SNF/single/private pay; $73 for SNF/double/private pay; $73 for SNF/double/Medicare; $68 for SF/double Medicaid; $68 for ICF/single/private pay; $70.75 for ICF/double/private pay; and $68 for ICF/double/Medicaid. Health Quest's fill-up and occupancy projections, as well as its projections of revenue and expenses, are reasonable. They were reasonable when initially reviewed by the Department, and as updated. During the course of these proceedings, a serious question was raised as to whether Health Quest had demonstrated that it had the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, or that it was committed to the subject project. Within the past three years, Health Quest has sold three of its approved CONS and is considering the sale a fourth due to its inability to handle that number of projects, and the adverse impact it would have on its ability to deliver quality care. Notwithstanding its inability to proceed with approved projects, Health Quest proceeded to hearing in October 1987 and December 1987 for nursing home CONs in Hillsborough County and Lee County (the subject application), and also had nine such applications pending in the January 1987 batching cycle and eight such applications in the October 1987 batching cycle. Health Quest's actions are not logical, nor supportive of the conclusion that it is committed to this project or that it possesses available resources for project accomplishment. Under the circumstances, Health Quest has failed to demonstrate that it has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation. Health Quest's facilities in Jacksonville and Boca Raton currently hold superior ratings from the Department. A superior rating includes consideration of staffing ratios, staff training, the physical environment, physical and restorative therapies, social services, and other professional services. Those facilities are monitored, as would the subject facility, by Health Quest for quality care through a system of quarterly peer review, and provide extensive staff education programs that include orientation training for new staff and on-going education for regular staff. Health Quest has demonstrated that it has provided quality care. However, in light of the strain its current activities have placed on its resources, it is found that Health Quest has failed to demonstrate that it could provide quality care at the proposed facility were its application approved. Hillhaven, Inc. Hillhaven is a wholly owned subsidiary of the Hillhaven Corporation, which is a subsidiary of National Medical Enterprises. The Hillhaven Corporation has been business for almost 30 years, and is currently responsible for the operation of approximately 437 nursing homes and retirement centers nationally, including 15 nursing homes which it owns or operates in the State of Florida. Hillhaven proposes to develop a new 120-bed skilled and intermediate care community nursing home in Fort Myers, Lee County, consisting of 38,323 square feet. It will include 14 private rooms and 53 semi-private rooms, a full bath attached to each room (shower, toilet and sink), central tub rooms, beauty- barber shop, quite lounge, chapel, physical therapy room, occupational therapy room, and outdoor patio areas. In all, Hillhaven's proposed facility meets or exceeds state requirements for the construction of nursing homes. As initially reviewed by the Department, Health Quest's proposed facility would be a single-story building containing 38,323 gross square feet, with an estimated total project cost of $3,544,444. As proposed, the total project cost equates to $29,537 per bed, and as designed provides 217 net square feet of living space for both private and semi-private rooms. Construction equipment costs were as follows; construction costs $2,146,000; cost per square foot $56.00; construction cost per bed $17,884; equipment costs $442,005; and equipment cost per bed $3,683.38. Hillhaven's project costs are reasonable. As with the other applicants, Hillhaven update its project costs at hearing to account for the changes which were occasioned by the delay between initial review and de novo hearing, certain oversights in its initial submission, and its decision to proceed with type 4 construction as opposed to type 5 construction as originally proposed. As updated, the estimated project cost is $4,089,639, or $34,155.33 per bed. Construction equipment costs, as updated, were as follows: construction costs $2,446,088; cost per square foot $63.82; construction cost per bed $20,384; equipment costs $521,200; and equipment costs per bed $4,343.33. By far, the biggest factor in the increased construction costs was Hillhaven's decision to proceed with type 4 construction as opposed to type 5 construction. Either type of construction would, however, meet or exceed state standards, and Hillhaven's estimates of construction and equipment costs are reasonable. The Hillhaven facility will offer skilled and intermediate care, occupational therapy, speech therapy, physical therapy, recreational services, restorative nursing services, and social services. Hillhaven does not discriminate on admission, and would admit Alzheimer's and subacute patients as presented. Were sufficient demand experienced, Hillhaven has the ability to provide and would develop a full Alzheimer's unit, and provide day care and respite care. Currently, Hillhaven operates 36 Alzheimer's units at its facilities nation wide, but has experienced no demand for such a special unit or other special care at its existent Lee County facility. As originally reviewed by the Department, Hillhaven's staffing levels an expenses were reasonable. At hearing, Hillhaven increased its staffing levels to account for staff inadvertently omitted from its initial application, and increased its staffing expenses to account or intervening changes in the market place. As updated, Hillhaven's staffing level is 2.5, and its staffing levels and expenses are reasonable. Hillhaven's projected utilization by class of pay as originally reviewed by the Department was as follows: private pay 30 percent, Medicaid 60 percent, and Medicare 10 percent. As updated at hearing, Hillhaven's utilization projection was as follows: private pay 44 percent, Medicaid 53 percent, and Medicare 3 percent. Currently, Hillhaven provides, on average, 53 percent Medicaid care at its facilities in Florida. Hillhaven's estimate of payor mix was reasonable and, in light of intervening changes in circumstance, was reasonable as updated. Hillhaven's patient charges for its second year of operation as originally reviewed by the Department ranged from $58.60 to $62.00 per day. As updated, Hillhaven's patient charges ranged from $52.13 to $73.50 per day. Hillhaven's estimated charges were achievable when initially proposed and as updated, and are reasonable. Hillhaven's fill-up and occupancy projections, as well as its projections of revenues and expenses, are reasonable. They were reasonable when initially reviewed by the Department, and comport, as updated, with the current experience in Lee County. Hillhaven has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other necessary personnel to staff its facility. Its pro forma estimates are premised on reasonable assumptions, and Hillhaven has demonstrated the short term and long term financial feasibility of its project. Currently, Hillhaven owns or operates 15 facilities in the State of Florida. Of these 15 facilities, two have opened within the past year and are not eligible for ratings. Nine of the 13 eligible facilities are operating with superior licenses. Of the remaining four facilities, two have a standard license and two have a conditional license. The two facilities with conditional ratings have both resolved their deficiencies. Hillhaven has provided and will continue to provide quality care. It ensures that quality care will be maintained within its facilities by drawing upon the professional resources four regional offices comprised of registered nurses, quality assurance monitors, regional dietitians, maintenance supervisors, employee relations specialists, and other administrative support personnel. Regional consultants visit company facilities monthly to plan, organize and monitor operations, and to conduct in-service training workshops. Overall, Hillhaven provides each facility with an in-depth quality assurance program. Gene Lynn d/b/a Careage Southwest Healthcare Center Gene Lynn (Careage) is the president and 100 percent owner of Careage Corporation. Since 1962, Careage has developed approximately 150 nursing homes and retirement centers, as well as 100 medically related facilities, in 22 states and the Virgin Islands. Until December 1986 it did not, however, own or operate any facilities. Currently, Careage operates four nursing homes in the United States (one in the State of Washington, two in the State of California, and one in the State of Arizona) , but none in Florida. The home office of Careage is located in Bellevue, Washington. Careage proposed to develop a new 120-bed skilled and intermediate care nursing home in Lee County with specialty units for subacute and Alzheimer's care, consisting of 45,500 square feet. It would include a patient care unit consisting of 2 isolation rooms and 7 private rooms with full bath and 45 semiprivate rooms with half-bath, an Alzheimer's unit consisting of 1 private room with full bath and 10 semiprivate rooms with half bath, central dining area, beauty-barber shop, quiet lounge, chapel, physical therapy room, occupational therapy room, outdoor patio areas, and exam-treatment room. As proposed, the nursing home meets or exceeds state standards. As initially reviewed by the Department, Careage's proposed facility was a single-story building containing 45,500 gross square feet, with an estimated total project cost of $4,150,000. As proposed, the total project cost equates to 34,583 per bed, and as designed provides 184-227 net square feet of living space for isolation/private rooms, and 227-273 net square feet of living space or semi-private rooms. Construction equipment costs were as follows: construction costs $2,583,125; cost per square foot $56.77; construction cost per bed $21,526; equipment costs $420,000; and equipment cost per bed $3,500. Careage's methods of construction, as well as its construction and equipment costs, are reasonable. The Careage facility would offer skilled and intermediate care, occupational therapy, physical therapy, recreational services and social services. Additionally, the proposal includes a special 21-bed unit dedicated solely to the treatment of Alzheimer's disease patients, and a dedicated 10-bed unit for subacute care which will accommodate technology dependent children care. Among the subacute services to be offered are hyperalimentation, IV therapy, ventilators, heparin flush, and infusion pumps for administration of fluids. Careage will offer respite care as beds are available, and will offer day care in a separate facility. Careage's projected utilization by class of pay as originally reviewed by the Department was as follows: private pay 49 percent, Medicaid 40 percent, Medicare 3 percent, subacute (private) 6 percent, and VA 2 percent. Careage's patients charges for its facility were projected as follows: private and VA (room rate only) $63.86, Medicaid (all inclusive rate) $59.23, Medicaid (all inclusive rate) $108.15, and private (other) /subacute (room rate only) $128.75. Careage's fill-up and occupancy projections as well as its projections of revenues and expenses, for its 120-bed facility were not shown to be reasonable. First, in light of the fact that there was no quantifiable demand for a dedicated Alzheimer's unit and subacute care unit, as discussed infra at paragraphs 126-129, no reliable calculation of fill-up and occupancy rates or revenues and expenses could be derived that was, as the Careage application is, dependent on such revenue stream. Second, the Careage pro forma was predicated on average rates experienced in Lee County. Since Careage proposes heavier nursing care than that currently experienced in Lee County, its estimates of patient charges are not credible. At hearing, Careage updated its 120-bed application to account for inflationary factors that had affected the project since it was first reviewed, and to correct two staffing errors. These updates did not substantially change the project. Careage has the available resources, including management personnel and funds for capital and operating expenditures, for project accomplishment and operation, and will be able to recruit any other necessary personnel to staff its facility. Its pro forma estimates were not, however, premised on reasonable assumptions, and Careage has failed to demonstrate the short term and long term financial feasibility of its 120-bed project. Following the Department's initial review of the applications in this batching cycle, it proposed to award a certificate of need to Careage for a 60- bed facility, premised on its conclusion that there was insufficient numeric need to justify an award of beds exceeding that number, notwithstanding the fact that the application of Careage was for 120 beds and did not request or propose a 60-bed facility. Notably, all financial, staffing, construction, equipment and other projections described in the Careage application were based on a 120- bed facility, and no information was provided regarding a 60- bed facility. Also notable is the fact that the other applicants were not accorded equal consideration. Not surprisingly, the proposed award of a CON for 60-beds to Careage was timely challenged, but Careage did not protest the Department's denial of its application for 120 beds but appeared as a respondent to defend the Department's decision to award it 60 beds. At hearing, Careage offered proof of the reasonableness of its 120- bed proposal over the objection of the other applicants. /5 Careage contends that its proposed 60-bed facility is a scaled down version of its 120-bed proposal Careage proposes to offer the same services in its 60-bed facility as it proposed in its 120-bed facility, including the 21-bed Alzheimer's unit and 10-bed subacute care unit. Its proposed 60- bed facility is not, however, an identifiable portion of its initial project. As proposed, the 60-bed facility would contain 26,900 gross square feet, and meet or exceed state standards. It would include a patient care unit consisting of 1 isolation room and 4 private rooms with full bath, 17 semi- private rooms with half-bath, an Alzheimer's unit consisting of 1 private room with full bath and 10 semi-private rooms with half-bath, together with the same amenities offered by the 120-bed facility, but on a reduced scale. As proposed, the total project cost for the 60-bed facility is $2,475,000, which equates to $41,250 per bed. As designed, the facility would provide the same net square footage of living space for private and semi-private rooms as the 120-bed facility. Construction equipment costs would be as follows: construction costs $1,431,750; cost per square foot $53.22; construction cost per bed $23,863; equipment costs $210,000; and equipment cost per bed $3,500. Careage's methods of construction, as well as its construction and equipments costs, are reasonable. Careage's projected utilization by class of pay in its 60-bed facility was as follows: private pay 47 percent, Medicaid 40 percent, Medicare 5 percent, subacute (private) 6 percent, and VA 2 percent. Careage's patient charges for its 60-bed facility were projected as follows: private and VA (room rate only) $66.00, Medicaid (all Inclusive rate) $63.50, Medicare (all inclusive rate) $120.00, private (other)/subacute (room rate only) $130.00. Careage's fill-up and occupancy projections, its projections of revenue and expenses, and its pro forma estimates for its 60-bed facility suffer the same deficiencies as those for its proposed 120-bed facility. Under the circumstances, Careage has failed to demonstrate the short term and long term financial feasibility of its 60-bed facility. While Careage has only owned and operated nursing homes for a short time, the proof demonstrates that it has and will continue to provide quality care for its residents. The Alzheimer's unit and subacute care units are reasonably designed, equipped and staffed for their intended functions. Staffing ratios in the subacute unit will be 6.0, and in the other areas of the facility 3.0. Careage currently utilizes a quality assurance program at each facility which includes a utilization review committee, safety committee, infection control committee, and pharmaceutical committee. Each facility also has a resident advisory council, community advisory council, and employee advisory council. Presently, Careage is developing a company level quality assurance program, and has initiated announced and unannounced site visits by a quality assurance expert to evaluate resident care, operations, maintenance and physical environment. The Department of Health and Rehabilitative Services The opinions expressed by the witnesses offered by the Department were premised on information available to them while these applications underwent "preliminary" review. The information available to them at that time, and represented by the State Agency Action Report (SAAR), was incomplete and inaccurate in many respects, including the services to be provided by some of the applicants and the approved bed inventory and occupancy rates utilized in the need methodology. These witnesses were not made privy to, and expressed no opinions, regarding the relative merits of the applications in light of the facts developed at hearing. Throughout the hearing, counsel for the Department objected to evidence from any applicant regarding "updates" (changes) to their applications as they were deemed complete by the Department prior to its initial review. It was the position of the Department's counsel, but otherwise unexplicated, that the only appropriate evidence of changed conditions after the date the application was deemed complete were those changes which relate to or result from extrinsic circumstances beyond the control of the applicant, such as inflation and other current circumstances external to the application. The majority of the "updated" material offered by the applicants at hearing did result from the effects of inflation, the passage of time between the application preparation and the dates of final hearing, changes in the market place regarding nursing salaries, changes in the Medicaid and Medicare reimbursement system and typographical errors in the application. Some changes in design were offered as a result of the applicant's experience with other construction projects and in order to comply with licensing regulations. There were also some changes which resulted from better information having been secured through more current market surveys. None of the applicants attempted to change their planning horizon, the number of beds proposed, the proposed location of the facility or the services to be offered except Careage. The Department has established by rule the methodology whereby the need for community nursing home beds in a service district shall be determined. Rule 10-5.011(1)(k)(2), Florida Administrative Code; formerly, Rule 10- 5.11(21)(b) Florida Administrative Code. The first step in calculating need pursuant to the rule methodology is to establish a "planning horizon." Subparagraph 2 of the rule provides: Need Methodology... The Department will determine if there is a projected need for new or additional beds 3 years into the future according to the methodology specified under subparagraphs a. through i. The Department interprets subparagraph 2, and the applicants concur, as establishing a "planning horizon" in certificate of need proceedings calculated from the filing deadline for applications established by Department rule. This interpretation is consistent with the numeric methodology prescribed by subparagraph 2, and with the decision in Gulf Court Nursing Center v. Department of Health and Rehabilitative Services, 483 So.2d 700 (Fla. 1st DCA 1986). Applying the Department's interpretation to the facts of this case establishes a "planning horizon" of July 1989. Pertinent to this case, subparagraphs 2a-d provide the methodology for calculating gross bed need for the district/subdistrict in the horizon year. In this case, the applicable district is District 8, and the applicable subdistrict is Lee County. The first step in the calculation of gross need for the horizon year is to derive "BA", the estimated bed rate for the population age group 65-74 in the district. This rate is defined by subparagraph 2b as follows: BA LB/ (POPC + (6 x POPD) Where: LB is the number of licensed community nursing home beds in the relevant district. POPC is the current population age 65-74 years. POPD is the current population age 75 years and over. The parties concur that the district licensed bed figure (LB), as well as the subdistrict licensed bed figure (LBD) is calculated based on the number of community nursing home beds as of June 1, 1986. The Department's Semi-Annual Nursing Home Census Report and Bed Need Allocation prepared for the July 1986 review cycle (July 1989 planning horizon) listed 4,193 licensed community nursing home beds in District 8 and 996 in Lee County. However, that count taken on May 1, 1986, did not include 120 new beds which were licensed in Charlotte County on May 8, 1986. The count also excluded 287 beds at four other facilities in the district, including 60 beds at Calusa Harbor in Lee County, because they were listed as sheltered beds according to Department records at that time. After passage of Section 651.118(8), Florida Statutes, the Department surveyed the facilities and found that the beds at these four facilities were operated as community beds rather than sheltered beds. Under the circumstances, the proof demonstrates that as of June 1, 1986, there were 4,600 licensed community nursing home beds in district 8 (LB) and 1,056 in Lee County (LBD). The formula mandated by the rule methodology or calculating BA requires that the "current population" for the two age groups be utilized. The rule does not, however, prescribe the date on which the "current population" is to be derived. Some of the applicants contend that the current population" for POPC and POPD should correspond to the period for which the average occupancy rate (OR) is calculated or the July batching cycle, OR based upon the occupancy rates of licensed facilities for the months of October through March preceding that cycle. Under this theory, January 1, 1986, as the midpoint of that period, is the appropriate date to calculate "current population" to derive PCPC and POPD. The Department contends that "current population" for POPC and POPD should be calculated as of July 1986, the filing deadline for applications in this review cycle. The Department's position is, however, contrary to its past and current practice. The need reports issued by the Department between December 1984 and December 1986, routinely used a three and one- half year spread between the base population period and the horizon date for "current population." In the January 1987 batching cycle, which cycle immediately followed the cycle at issue in this case, the Department utilized a three and one-half spread between the base population period and the horizon date for "current population" when it awarded beds in that cycle. The Department offered no explanation of why, in this case, it proposed to deviate from its past and current practice. Under the circumstances, January 1, 1986, is the appropriate date on which the "current population" is to be calculated when deriving POPC and POPD. The parties are also in disagreement as to whether population estimates developed after the application deadline can used to establish the current population. Rule 10- 5.011(k)2h, Florida Administrative Code, mandates that population projections shall be based upon the official estimates and projections adopted by the Executive Office of the Governor, but does not limit such proof to any particular estimate. The Department advocates the use of population estimates existent at the application deadline. Accordingly, it would apply the official estimates and projections adopted by the Executive Office of the Governor as of July 1, 1986. Other parties would apply the more recent estimates adopted by the Office of the Governor as of July 1, 1987. In this case, the use of either estimate would have no significant effect on the result reached under the rule methodology; however, since all population estimates and projections are only approximations rather than actual counts, it would be more reasonable from a health planning perspective to use the latest estimates of the 1987 population than the estimates available at the time of application. In this case, this means using July 1, 1987, estimates of January 1986 populations. These estimates are still "current" as of January 1986, since It is still the January 1986 population that is to be measured, and more reliable from a health planning perspective than the prior projection. In the same manner, July 1, 1987, estimates of horizon year 1989 populations (PCPA and POP), infra, would also be used rather than July 1, 1986, estimates of that population. Accordingly, Forum's calculation POPC (128,871), POPD (77,194), POPA (149,645), and POPB (95,748) is appropriate. (Forum Exhibit 10, Appendix A) Application of the methodology prescribed by subparagraph 26 to the facts of this case produces the following calculation: BA 4,600/(128,871 + (6 x 77,194) BA 4,600/(128,871 + 463,164) BA 4,600/592,035 BA .0077698 The second step in the calculation of gross need for the horizon year is to derive "BB", the estimated bed rate for the population age group 75 and over in the district. This methodology is defined by subparagraph 2c, and calculated in this case as follows: BB 6 x BA BB 6 x .0077698 BB .0466188 The third step in the calculation of gross need for the horizon year is to derive "A", the district's age adjusted number of community nursing homes beds" at the horizon year. This methodology is defined by subparagraph 2a as follows: A (POPA x BA) + (POPB x BB) Where: POPA is the population age 65-74 years in the relevant department district projected three years into the future. POPR is the population age 75 years and older in the relevant departmental district projected three years into the future. Application of the methodology prescribed by subparagraph 2a to the facts of this case produces the following calculation: A (149,645 x .0077698) + (95,748 x .0466188) A 1,162.7117 + 4,422.4086 A 5,585.12 The final step in the calculation of gross need in the horizon year is to derive "SA", the preliminary subdistrict allocation of community nursing home beds;" gross need in the case. 7/ This calculation is defined by subparagraphs 2d as follows: SA A x (LBD/LB) x (OR/.90) Where: LBD is the number of licensed community nursing home beds in the relevant subdistrict. OR is the average 6 month occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district. Occupancy rates established prior to the first batching cycle shall be based upon nursing home patient days for the months of July 1 through December 31; occupancy rates established prior to the second batching cycle shall be based upon nursing home patient days for the months of January 1 through June 30. The batching cycle in which these applications were filed, however, occurred before the Department amended its rule to include the fixed need pool concept contemplated by subparagraph 2d. Accordingly, the parties concur that the six month period on which the average occupancy rate is calculated is not as set forth in subparagraph 2d of the current rule, but, rather, defined by former rule 1C--5. 11(21)(b)4 as follows: OR is the average occupancy rate for all licensed community nursing homes within the subdistrict of the relevant district. Review of applications submitted for the July batching cycle shall be based upon occupancy data for the months of October through March preceding that cycle... In calculating the occupancy rate (OR) for the licensed community nursing homes in the subdistrict (Lee County) the Department derived a figure of 91.91. The Department arrived at this figure based on the first day of the month patient census of each facility considered to have community beds (LBD=1,056), which included the 60 beds at Shell Point Nursing Pavilion; assumed that such census was maintained throughout the entire month; and then divided such patient days by the actual number of beds available. The Department's methodology is an accepted health planning technique, and comports with its previous practice. Some of the parties disagree with the technique utilized by the Department to calculate OR, and advocate the use of actual patient day occupancy to derive OR. This technique differs from the "first of the month" technique by utilizing the actual number of patient days experienced by the facility, as opposed to assuming a constant census based on first of the month data. This alternative methodology is, likewise, an accepted health planning technique, and if proper assumptions are utilized will yield a more meaningful result than the Department's methodology. In this case, the proponents of the "actual patient day occupancy" methodology, erroneously assumed that 160 beds at Shell Point Nursing Pavilion were community nursing homes beds, as opposed to 60 beds; and, based on an erroneous LBD of 1,156, derived a subdistrict occupancy rate of 92.97. Under such circumstances, these proponents calculations are not reliable, and the subdistrict occupancy rate derived by the Department is accepted. Applying the facts of this case to the methodology prescribed by subparagraph 2d produces the following gross need calculation for the subdistrict: 5A 5,585.12 x (1,056/4,600) x (.9191/.9) SA 5,585.12 x .2295652 x 1.0212222 SA 1309.36 The final step in the numeric need methodology is to derive net need from gross need. According to subparagraph 2i, this need is calculated as follows: The net bed allocation for a subdistrict, which is the number of beds available for Certificate of Need approval, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant department subdistrict from the bed allocation determined under subparagraphs 2.a. through f. unless the subdistrict's average occupancy rate for the most recent six months is less than 80 percent, in which case the net bed allocation is zero. The number of approved and licensed nursing home beds for the second batching cycle in 1987 shall be based on the number of approved and licensed beds as of August 1, 1987, in subsequent nursing home batching cycles, the number of licensed and approved beds to be used in establishing net need for a particular batching cycle shall be determined as of the agency's initial decision for the immediately preceding nursing home batching cycle. While the rule requires that net need be calculated by subtracting "the total number of licensed and 90 percent of the approved beds" In the subdistrict from the cross need previously calculated, it is silent as to the date that inventory should be calculated when, as here, the batching cycle at issue predates its enactment. In the face of this dilemma, the parties rely on the provisions of former rule 10-5.11(21)(b) , Florida Administrative Code, which was existent when their applications were filed to resolve their dispute. Under the circumstances, reference to former rule 10-5.11(21)(b), is appropriate. Former rule 10-5.11(21)(b)9 provides: The net bed allocation for a subdistrict, which is the number of beds available, is determined by subtracting the total number of licensed and 90 percent of the approved beds within the relevant departmental subdistrict from the bed allocation determined under subaragraphs 1 through 9 (sic 8).... (Emphasis added) While the former rule requires that net need be calculated by subtracting "the total number of licensed and 90 percent of the approved beds" in the subdistrict from the gross need calculated under subparagraphs (b)1-8, it is silent as to the date that inventory should be calculated. The Department asserts that the number of licensed beds should be calculated as of June 1, 1986 (the date established by subparagraph (b)7 of the former rule as the data base for calculating LB and LBD, and the number of approved beds as of December 18, 1986 (the date the Department's supervisory consultant signed the state agency action report). The other parties would likewise calculate licensed beds as of June 1, 1986, but would also calculate approved beds as of that date. The Department offered no reasonable evidentiary basis for its interpretation of the date at which the total number of licensed and approved beds are to be calculated under subparagraph (b)9 of the former rule. As discussed below, the dates used by the Department and the other parties for purposes of calculating net need were facially unreasonable. The Inventory of licensed and approved beds under subparagraph (b)9 of the former rule, as well as subparagraph 2i of the current rule, are inextricably linked. As approved beds are licensed, the approved bed inventory decreases and the licensed bed inventory increases. The Department's interpretation of the dates at which licensed and approved beds are to be counted is neither logical nor rational, since it could result in some beds not being counted as either licensed or approved. For example, if beds were approved and not yet licensed on June 1, 1986, but licensed before the consultant supervisor signed the SAAR (state agency action report), they would not be counted in either inventory. On the other hand, the other parties' approach would ignore all beds licensed or approved from previous batching cycles after June 1, 1986 which beds were intended to serve at least a portion of the future population. The fundamental flaw in the parties' approach to establishing an inventory date under subparagraph (b)9, was the assumption that subparagraph (b)7 of the former rule defined licensed bed inventory for purposes of subparagraph (b)9. The Department's rule must be construed in its entirety, and all parts of the rule must be construed so as to work harmoniously with its other parts. So construed, the only logical conclusion to be drawn, as hereinafter demonstrated, is that subparagraph (b)7 defines LB and LBD ("current" licensed beds) for the cross need calculation under the methodology defined by subparagraphs (b)1-4, and does not presume to define licensed beds for the net need calculation under subparagraph (b)9. Subparagraphs (b)1-4 and 7 of the numeric need methodology prescribed by the former rule is designed to yield a gross bed need for the horizon year. The keys to this methodology are the calculation of a current bed rate (BA) and current occupancy rate (OR) for the current using population, and the projection of those rates on the population to be served in the horizon year. A meaningful calculation of the current bed rate cannot, however, be derived without a current inventory of licensed beds (LB and LBD). Accordingly, the relationship between subparagraph (b)7, which defines the data base (June 1, 1986 in this case) for defining LB and LBD (the "current" licensed bed inventory) to the gross bed need calculation is apparent. The parties' suggestion that subparagraph (b)7 defines licensed bed inventory under subparagraph (b)9 not only ignores the inextricable link between subparagraph (b)7 and the gross bed need methodology, but also the language and purpose of subparagraph (b)9. The purpose of that subparagraph is to derive a realistic estimate of actual (net) bed need in the horizon year. Since all licensed and approved beds from previous batching cycles were intended to serve at least a portion of the horizon population, it would be illogical to ignore any of those beds when calculating net need. Accordingly, it would be unreasonable in this case not to count any beds that were licensed or approved from previous batching cycles between June 1, 1986, and the date a decision is rendered on these applications. Indeed, subparagraph (b)9 speaks to "the total number" of licensed and approved beds, not beds existent on June 1, 1986. In sum, subparagraph (b)7 cannot be read to define licensed bed inventory under subparagraph (b)9, and the parties' suggestion that it can is rejected as contrary to the clear language of the rule methodology. See: Boca Raton Artificial Kidney Center, Inc. v. Department of Health and Rehabilitative Services, 493 So.2d 1055 (Fla. 1st DCA 1986). Since the purpose of subparagraph (b)9 is to calculate a realistic estimate of the net bed need for the horizon year, it is appropriate to use the most current inventory of licensed and approved beds at the point a decision is rendered on an application. This assures to the greatest extent possible that the horizon population will not be over or undeserved. In those circumstances where the SAAR becomes final agency action, the Department's approach of calculating inventory on the date the supervisory consultant signs the SAAR, assuming that inventory includes licensed and approved beds on that date, might be reasonable. However, where, as here, the SAAR constitutes only preliminary agency action, and a de novo review of the application is undertaken, there is no rational basis for subsuming that inventory. The rule methodology considered, the only rational conclusion is that net need be derived on the date of de novo review, and that it be calculated reducing the gross need calculation by the inventory of licensed and approved beds from previous batching cycles existent on that date. As of the date of administrative hearing there were 1,056 licensed beds and 120 approved beds in the subdistrict. Applying the methodology prescribed by subparagraph 2i to the facts of this case calculates a net need of 145 community nursing home beds for the July 1989 planning horizon. Special Circumstances. The Department will not normally approve an application for new or additional nursing home beds in any service district in excess of the number calculated by the aforesaid methodology. Rule 10-5.011(1)(k), Florida Administrative Code. Succinctly, the need for nursing home services, whether they be general or special, is a product of the rule methodology, and not relevant to a calculation of need absent a demonstration of special circumstances. The Department has adopted by rule the methodology to be utilized in demonstrating special circumstances that would warrant a consideration of factors other than the numeric need methodology in deciding the need for nursing home services. That rule, 10-5.011(1)(k)2; Florida Administrative Code, provides: In the event that the net bed allocation is zero the applicant may demonstrate that circumstances exist to justify the approval of additional beds under the other relevant criteria specifically contained at Section 10-5.011. Specifically, the applicant may show that persons using existing and like services are in need of nursing home care but will be unable to access nursing home services currently licensed or approved within the subdistrict. Under the provision, the applicant must demonstrate that those persons with a documented need for nursing home services have been denied access to currently licensed but unoccupied beds or that the number of persons with a documented need exceeds the number of licensed unoccupied and currently approved nursing home beds. Existing and like services shall include the following as defined in statute or rule, adult congregate living facilities, adult foster homes, homes for special 505 home health services, adult day health care, adult day care, community care for the elderly, and home care for the elderly. Patients' need for nursing home care must be documented by the attending physicians' plans of care or orders, assessments performed by staff of the Department of Health and Rehabilitative Services, or equivalent assessments performed by attending physicians indicating need for nursing home care. In the instant case, some of the applicants have proposed special services, including an Alzheimer's unit, subacute care unit, and beds for technology dependent children. They offered, however, no proof that any person with a documented need for such services had been denied access to available beds that the number of persons with a documented need exceeded the number of available beds. Succinctly, there is no credible proof that the need for nursing home services in Lee County exceeds that calculated pursuant to the numeric need methodology. While there are no special circumstances existent in this case that would justify an award of beds in excess of that calculated by the rule methodology, that does not mean that consideration of the Alzheimer's, subacute and technology dependent children services offered by some of the applicants is not relevant to the comparative review of the subject applications. Rather, it means that the need for such services will presumptively be met within the need calculated by the rule methodology. How the applicants propose to address that need is, however, a matter for consideration in a comparative review of their applications. Each of the applicants propose to provide subacute care, with Careage proposing a special 10-bed subacute care unit which would accommodate technology dependent children. HCR and Careage propose special Alzheimer's care units; a 15-bed unit by HCR and a 21-bed unit by Careage. Hillhaven will admit Alzheimer's disease patients as presented, and will develop a dedicated Alzheimer's unit if demand should subsequently develop. The prevalence of Alzheimer's disease and the increased demand for subacute services brought about by DRGs, demonstrates that there will be a demand for such services within existing and proposed facilities. There was, however, no persuasive proof of any demand for technology dependent services in Lee County. While there is a demand for Alzheimer's disease care, and the preferred mode of care is in a separate unit specifically designed, staffed, and equipped to deal with this degenerative disease, there was no persuasive proof that the demand is such as to warrant the creation of a separate unit such as proposed by HCR and Careage. 10/ Absent such quantifiable demand, the application of Hillhaven more realistically addresses the need for Alzheimer's disease patients than does that of the other applicants. With regard to subacute care services, the proof likewise fails to quantify the demand for such services. Under such circumstances, Careage's proposed 10-bed subacute care unit is not objectively warranted, and does not serve to better its proposal to provide such services over the proposals of the other applicants. Consistency with district plan and state plan The District 8 health plan contains the following pertinent standards and criteria: Community nursing home services should be available to the residents of each county, 4 within District Eight. At a minimum, community nursing home facilities should make available, in addition to minimum statutory regulation, in the facility or under contractual arrangements, the following services: a. pharmacy h. occupational therapy b. laboratory i. physical therapy c. x-ray j. speech therapy c. dental care k. mental health counseling e. visual care l. social services f. hearing care m. medial services g. diet therapy New and existing community nursing bed developments should dedicate 33-1/3 percent of their beds to use for Medicaid patients. Community nursing home (skilled and intermediate care) facilities in each county should maintain an occupancy rate of at least 90 percent. No new community nursing home facility should be constructed having less than 60 beds... Each nursing facility should have a patient transfer agreement with one or more hospitals within an hour's travel time, or the nearest hospital within the same county. All community nursing homes and applicants for community nursing homes should document their history of participation in Medicaid and Medicare programs. ... The State Health Plan contains the following pertinent goals: GOAL 1: TO DEVELOP AN ADEQUATE SUPPLY OF LONG TERM CARE SERVICES THROUGHOUT FLORIDA. GOAL 2: TO ENSURE THAT APPROPRIATE LONG TERM, CARE SERVICES ARE ACCESSIBLE TO ALL RESIDENTS OF FLORIDA. Each of the applicants demonstrated that their proposal would conform, at least minimally, with the foregoing provisions of the state and local health plans. Of particular significance to Lee County is, however, an applicant's commitment to Medicaid service. The District 8 Council has reported that hospitals in Lee County are having difficulty placing Medicaid patients in nursing homes due to the unavailability of Medicaid beds. The current Medicaid experience is 46 percent. Therefore, the local council has directed that new and existing community nursing home developments should dedicate at least 33-1/3 percent of their beds for Medicaid patients. While all applicants propose to meet this standard, Hillhaven's proposal to dedicate 53 percent of its beds to Medicaid care is substantially greater than the commitment of the other applicants, and is consistent with its current experience in meeting a community's need for nursing home care. Availability, appropriateness, and extent of utilization of existing health care services Section 381.705(1)(b), Florida Statutes, requires Consideration of the availability, quality of care, efficiency, appropriateness, accessibility, extent of utilization, and adequacy of like and existing health care services in the service district. When the subject applications were filed, there were 1,056 licensed beds in Lee County with an occupancy rate of 91.91 percent. The nursing home bed supply in Lee County is obviously strained, and there exist no reasonable alternatives to the addition of new beds to the subdistrict. To coordinate with existing health facilities, each applicant proposes to establish appropriate transfer agreements and affiliations with local physicians, hospitals, and other health care providers. While some of the applicants have proposed an Alzheimer's unit and subacute care unit, the proof failed to demonstrate any quantitative need for such units in the subdistrict. Some applicants also proposed to provide day care in conjunction with their nursing home. Currently, there exists adequate day care in Lee County at little or no expense to the patient, and there was no persuasive proof of a need for additional day care services. Economies derived from joint health care resources HCR and Hillhaven each proposed 120-bed facilities which would provide for a more efficient and economical operation than a 60-bed facility. The 60-bed facilities proposed by Forum and Health Quest are, however, part of a larger complex which likewise lends itself to an efficient and economical operation. HCR, Hillhaven, Forum and Health Quest are major operators of nursing home facilities, and are thereby able to negotiate and obtain bulk prices for food, medical and nursing supplies. These savings are ultimately passed on to the residents. Additionally, by drawing upon a broad spectrum of expertise existent within their corporate networks, these applicants are best able to maintain and improve the services they offer. The criteria on balance In evaluating the applications at issue in this proceeding, none of the criteria established by Section 381.705, Florida Statutes, or Rule 10- 5.011(k), Florida Administrative Code, have been overlooked. As between the competing applicants, consideration of those criteria demonstrates that Hillhaven is the superior applicant whether it is evaluated on its application as initially reviewed by the Department or as updated at hearing. Among other things, the Hillhaven facility is spacious with large and well appointed patient rooms, its project costs are most reasonable (whether type 5 or type 4 construction), its programmatic proposal and staffing levels are most reasonable in light of existing demand, its provision for Medicaid services is the highest, and its patient charges are the lowest.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered granting Hillhaven's application for a certificate of need to construct a new 20-bed community nursing home in Lee County, and denying the applications of HCR, Forum, Health Quest and Careage. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 22nd day of November, 1988. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of November, 1987.

Florida Laws (2) 120.57651.118
# 4
PLANTATION NURSING HOME vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 85-001286 (1985)
Division of Administrative Hearings, Florida Number: 85-001286 Latest Update: Mar. 03, 1986

Findings Of Fact At all times material hereto, Plantation was a licensed nursing home facility and participated in the Medicaid program. A nursing home that receives a superior rating is entitled to incentives based on the Florida Medicaid Reimbursement Plan. Plantation has met all the requirements for a superior rating that are enumerated in Rule lOD-29.128, Florida _Administrative Code. The only reason Plantation was not granted a superior rating was based on the Medicaid Inspection of Care, Team report. (stipulated facts) From August 21 through August 31, 1984, Plantation underwent a routine inspection by the HRS Medicaid Inspection of Care (IOC) Team. The purpose of the inspection was to review the care and treatment of Medicaid recipient patients in accordance with state and federal standards in order for the facility to receive Medicaid payment for those individuals. During the course of the inspection, several deficiencies were found by IOC Team. The deficiencies were summarized in the Medicaid Inspection of Care Team report, entitled Facility Evaluation Summary, prepared by Ms. Tranger. The report listed the deficiencies as follows: Fifteen skilled and two intermediate out of 46 medical records reviewed failed to have medication revalidated by the attending physician within the proper time frame Four of forty-six records reviewed failed to have available documentation that laboratory tests were completed in accordance with doctors' orders and medication regimen, Fourteen skilled and thirteen intermediate out of 46 medical records reviewed failed to have the Plan of Care reviewed within the proper time frame: Ten medical records were not certified within the proper time frames and fifteen medical records were not current for recertification. As to the first deficiency noted, the problem was not that the physician failed to revalidate medication, but that Ms. Tranger did not think that the physician appropriately dated the revalidation. In almost all of the cases, the problem was that Ms. Tranger did not think that the physician had personally entered the date because the date was written with a different color of ink than the doctor's signature or the handwriting appeared to be different. Ms. Tranger did not know whether the dates were written by someone in the physician's office or someone at the nursing home. It is very difficult for a nursing home to get a physician to sign and date orders properly. Plantation had a procedure for securing the doctor's signature and having records dated. When a record was received that was not properly signed and dated, Plantation returned the record to the doctor with a letter or note telling the doctor what needed to be done. When returned by the doctor to Plantation, the record would bear the later date, which caused some records to be out of' compliance with the required time frames. The return to the doctor of records that were not properly dated may also explain why some of he dates were written in a different color ink than the doctor's signature. In those few cases where the dates on the report were not within the proper time frame, the dates were only a few days off. In one case a 34 day period, from July 7, 1984 to August 10, 1984, elapsed before the medication was revalidated. In another case, there were 33 days between the dates. In both cases the medication should have been revalidated every 30 days. The problem with the revalidation dates was strictly a paperwork problem and not one that affected the care of the patients. As stated before, in the majority of the cases the medication was revalidated within the proper time frame. The problem was simply that it appeared that someone other than the doctor had written down the date. The second deficiency was a finding by the surveyors that 4 of the 46 medical records reviewed failed to have available documentation regarding laboratory tests being completed in accordance with doctors' orders. However, Jean Bosang, Administrator of Plantation, reviewed all of the records cited by the IOC Team as the basis for these deficiencies and could only find two instances in which laboratory tests were not performed. HRS did not present any evidence to establish the two other alleged instances. Dr. Lopez reviewed the medical records of the two residents in question and determined that there was no possibility of harm to the patient as a result of failure to perform these tests. One of the two residents is Dr. Lopez' patient, and he normally sees her every day. He stated that the test, an electrolyte examination, was a routine test, that the patient had had no previous problems, and if any problem had developed, she would have had symptoms which would have been observable to the nurses. The tests performed before and after the test that was missed were normal, and the failure to perform the one test had absolutely no effect on the patient. Dr. Lopez was familiar with the other resident upon whom a test was not performed and had reviewed her records. This resident was to have a fasting blood sugar test performed every third month. Although this test was not performed in April of 1984, it was performed timely in every other instance. All tests were normal, and the failure to perform this test did not have any effect on the resident. Had she been suffering from blood sugar problems, there would have been physical signs observable to the nurses. The fourth deficiency listed in the report was a paperwork problem similar to the first deficiency. Patients in a nursing home are classified by level of care and must be recertified from time to time. Certification does not affect the care of the resident. The recertification must be signed and dated by the physician. Again, there was a problem on the recertification because some of the dates were in a different color ink than the physician's signature. Again, the problem was primarily caused by difficulty in getting proper physician documentation. The deficiency did not affect the care of the residents. Mr. Maryanski, who made the decision not to give Plantation a superior rating, testified that of the four deficiencies cited in the IOC report, he believed that only the third deficiency listed, in and of itself, would have precluded a superior rating. An analysis of that deficiency, however, shows that it also was mainly a paperwork deficiency and had no impact on patient care. The third deficiency listed involved a purported failure to have the plans of care reviewed within the proper time frames. Patient care plans are to be reviewed every 60 days for "skilled" patients, those that need the most supervision, and every 90 days for "intermediate" patients, those that need less supervision. A patient's plan of care is a written plan establishing the manner in which each patient will be treated and setting forth certain goals to be reached. A discharge plan is also established, which is basically what the nursing home personnel believe will be the best outcome for the patient if and when he or she leaves the hospital. The patient plan of care is established at a patient care plan meeting. Patient care plan meetings are held by the various disciplines in the nursing home, such as nursing, dietary, social work and activities, to review resident records and discuss any problems with specific residents. The manner in which the problem is to be corrected is determined and then written down on the patient's plan of care record. The evidence revealed that the basis of the deficiency was not a failure to timely establish or review a plan of care, but a failure to timely write down and properly date the plan of care. During the time in question, care plan meetings were held every Wednesday, and all of the disciplines attended the meetings. However, all disciplines did not write their comments on the patients' records at the meeting; some wrote them later. Usually, when they were added later, the comments were dated on the day they were written, rather than on the day the meetings were held. The evidence presented did not show any case in which all disciplines were late in making notes, but revealed only that specific disciplines were tardy. Since all the disciplines attended one meeting, it is apparent that when the date for any discipline was timely, the later dates of other disciplines merely reflected a documentation or paperwork problem. In late 1984 or early 1985, Plantation changed its system to avoid the problem in the future. There appeared to be problems with some of the discharge plans being untimely. The discharge plan is not utilized in the day-to-day care of the resident. Discharge plans at Plantation were kept in two places, and Ms. Tranger recognized that she may have overlooked some plans if they had been written only on the separate discharge sheet. The four deficiencies cited all involved time frames. There are innumerable time frames that must be met by a nursing home. The great majority of the deficiencies involved a failure to properly document. None of the deficiencies affected the care of the patients. Indeed, Ms. Tranger indicated that the patients were all receiving proper nursing care. The decision to give Plantation a standard rating was made by Mr. Maryanski based solely on the IOC report. He relied upon section 400.23,(3) Florida Statutes, which states: "The department shall base its evaluation on the most recent annual inspection report, taking into consideration findings from other official reports, surveys, interviews, investigations and inspections." There are no regulations or written or oral policies implementing this provision. Mr. Maryanski looked solely at the face of the IOC report and did not do any independent investigation. He never visited the nursing home, and he never talked to the on-site surveyors to determine whether the deficiencies cited by the IOC Team were significant. He never saw the underlying documentation which formed the basis of the report. Mr. Maryanski has no background either in nursing or medicine and had no knowledge of purpose the tests that were allegedly not performed. On October 4, 1984, the HRS Office of Licensure and Certification (OLC) conducted the annual survey of the facility. Mr. Maryanski did not determine whether the deficiencies found by the IOC Team had been corrected at the time of the annual survey. An IOC Team surveyor returned on November 21, 1984, and found that all of the deficiencies cited during the IOC inspection had been corrected. A resurvey of the facility was conducted on December 27, 1984, by OLC. All deficiencies noted in OLC's original inspection had been corrected. All nursing home facilities in Florida are rated by HRS as conditional, standard, or superior. In addition to its financial significance, the rating of a facility is important because it affects the facility's reputation in the community and in the industry. The rating for a facility goes into effect on· the day of the follow-up visit of OLC if all deficiencies have been corrected. Therefore, Plantation would have received a superior rating, effective December 27, 1984, had it not been for the IOC report Mr. Maryanski never tried to determine whether the deficiencies in the IOC report had been corrected subsequent to the report being issued. Under rule lOD-29.128, Florida Administrative Code, there are extensive regulatory and statutory requirements which must be met for a facility to be granted a superior rating. Plantation met all of the enumerated requirements, yet it received only a standard rating. Mr. Maryanski based his determination on the IOC report despite the fact that it was outdated and the deficiencies in that report were corrected by November, 1984, prior to the December, 1984, resurvey by the OLC. There was nothing in the annual survey report of the OLC to preclude a superior rating. This is the first time a facility has been denied a superior rating based upon a report other than the annual report.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Plantation Nursing Home be given a superior rating. DONE AND ENTERED this 3rd day of March, 1986, in Tallahassee, Leon County, Florida. DIANE A. GRUBBS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of March, 1986. COPIES FURNISHED: Jonathan S. Grout, Esquire Post Office Box 1980 Orlando, Florida 32802 Harold Braynon; Esquire District X Legal Counsel, 201 West Broward Boulevard Ft. Lauderdale, Florida 33301 William Page, Jr. Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 APPENDIX The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. Rulings On Proposed Findings of Fact Submitted by the Petitioner Accepted in Finding of Fact 1. 2-3. Accepted in Finding of Fact 2. 4. Accepted as set forth in Finding of Fact 21. 5-6. Accepted in Findings of Fact 22-23. 7-9. Accepted in Finding of Fact 24. 10. Rejected as immaterial. 11-12. Accepted in Findings of Fact 24-25. Accepted in Finding of Fact 19. Accepted in Finding of Fact 26. 15-16. Accepted generally in Findings of Fact 20 and 24. 17-19. Accepted generally as set forth in Finding of Fact 26. In Background section. Cumulative. Accepted in Finding of Fact 18. Accepted in Finding of Fact 12. 25-31. Accepted in substance in Findings of Fact 4-7. 32-43. Accepted in substance in Findings of Fact 8-10. 44. Rejected as not supported by the evidence. 45-46. Accepted in Finding of Fact 11. 47. Accepted in Finding of Fact 3. 48-49. Accepted in Finding of Fact 3. 50-57. Accepted in general in Findings of Fact 13-16. 58. Accepted in Finding of Fact 17. Rulings On Proposed Findings of Fact Submitted by the Respondent Accepted in Finding of Fact 1. Accepted generally in Findings of Fact 1, 20, 24. Accepted in Finding of Fact 1. Accepted generally in Finding of Fact 19 and Background. 5-8. Accepted in Finding of Fact 3. Accepted in substance in Finding of Fact 2. Accepted in Finding of Fact 2. Accepted in Finding of Fact 3. Accepted in Finding of Fact 13 except as to time frame for intermediate patients which should be 90 days. Accepted that the documentation showed a gap, but proposed finding rejected in that the evidence did not show that, in fact, the patient was not reviewed with the proper time frame. Accepted, without naming the patients, and explained in Finding of Fact 6.

Florida Laws (3) 120.57400.062400.23
# 5
AGENCY FOR HEALTH CARE ADMINISTRATION vs BEVERLY HEALTHCARE - LAKELAND, 00-003497 (2000)
Division of Administrative Hearings, Florida Filed:Lakeland, Florida Aug. 21, 2000 Number: 00-003497 Latest Update: Jul. 11, 2001

The Issue The issues for consideration in these cases are: as to Case Number 00-3497, whether the Agency for Health Care Administration should impose an administrative fine against the Respondent's license to operate Beverly Savana Cay Manor, a nursing home in Lakeland; and, as to Case Number 00-2465, whether the Agency should issue a conditional license to the Respondent's facility effective April 28, 2000.

Findings Of Fact At all times pertinent to the issues herein, the Petitioner, Agency for Health Care Administration, was the state agency in Florida responsible for the licensing of nursing homes and the regulation of the nursing home industry in this state. It is also the agency responsible for conducting surveys to monitor the compliance of nursing homes with the conditions of Medicare and Medicaid participation. Respondents, Beverly Savana Cay Manor, Inc., d/b/a Beverly Healthcare Lakeland, and Beverly Enterprises - Lakeland, are licensed by the Agency to operate a skilled nursing home at 1010 Carpenter's Way in Lakeland. On August 31, 1999, the Agency conducted an investigation into a complaint that Savana Cay had failed to provide sufficient nursing service and related services to allow residents to attain or maintain the highest practicable physical, mental, and psychosocial well-being as required by Federal rules governing Medicare and Medicaid. The Agency surveyor, Patricia Mills, observed several residents who did not have their call buttons within reach so that they could summon help if needed. Ms. Mills also talked with residents and family members and from these interviews determined that even when the resident could reach the call button and summon help, the response time was excessively long or, in some instances, the call went unheeded. This sometimes resulted in resident's suffering from the results of their incontinence because the staff did not timely respond to the help calls. Ms. Mills concluded, based on her extensive experience in surveying nursing homes, that the number of staff on duty was not sufficient to meet the residents' needs. It did not allow for the best possible well-being of the residents. Though the information related by Ms. Mills came from her interviews with residents and their families and was clearly hearsay testimony, it was admissible and considered as corroborative of her direct observation. The parties stipulated that a follow-up survey of the facility was conducted on October 13, 1999, at which time the deficiency described was deemed to have been timely corrected. The Respondent, by stipulation, does not concede the validity of this discrepancy on the August 19, 1999, survey, and the Agency does not rely on it to support the administrative fine sought to be imposed herein. Another survey of the facility was conducted by the Agency on April 26-28, 2000. On this occasion, surveyor Patricia Gold interviewed residents regarding the everyday life of the facility and reviewed resident council reports to follow up on any resident or family concerns which did not appear to have been addressed by the facility staff. During the resident interviews, Ms. Gold was advised that call lights were not answered in a timely fashion. In that connection, early on the morning of April 28, 2000, Ms. Gold observed a resident request a nurse to bring something to drink. The nurse was overheard to tell the resident the request would have to wait until she finished her report. Ms. Gold also noted on April 28, 2000, that dirty dishes were left uncollected over night in the facility common corridor and that one resident had two dirty trays left in the room. The dishes in the corridor were also seen by surveyors Donna Edwards and Marie Maisel. Based on their observations, the interviews, and the review of the council reports, the surveyors concluded that the staff on duty were insufficient in number. Another surveyor, Joanne Stewart, reviewed the resident files and medical reports of several of the residents and determined that in several cases the facility had failed to provide adequate supervision and assistive devices to prevent falls and inconsistently applied the interventions that were put in place. For example, Ms. Stewart observed Resident 12 on the floor at 2:40 p.m. on April 27, 2000. This resident, a cognitively impaired individual, had been placed in the facility from the hospital after he had sustained a fracture to his right hip and, at the time of the fall, still had staples in his hip. Ms. Stewart's review of the kardexes maintained by the certified nursing assistant (CNA) revealed there were no entries thereon indicating a need for special care to prevent this resident from falling. Although he was supposed to wear a tab alarm at all times, the facility staff knew the resident would periodically remove it, and when Ms. Stewart saw him prior to the fall, he was not wearing it. No other interventions, such as quick-release seat belts or Velcro belts, had been implemented to prevent his falls. It was just the kind of fall that he had which caused his placement in the facility and which gave rise to the need for supervision adequate to prevent further injury. He did not get the needed supervision. In fact, though the resident sustained a skin tear and bleeding of the arm as a result of the fall, the nurse who came to the scene of the fall went back to her desk and did some paperwork for between twenty and twenty-five minutes before the resident was provided any treatment for his injury. Ms. Stewart concluded the facility did not provide adequate supervision and assistance to Resident 12, and it is so found. Due to a cognitive impairment and an inability to ambulate due to an intracerebral hemorrhage, diabetes, and a cardio-vascular accident, Resident 9 was assessed at high risk for falls, and a determination was made that the resident should wear a tab alarm while in bed and in the wheelchair. During the course of her survey, Ms. Stewart observed this resident on several occasions without the tab alarm when she should have been wearing it. The resident had previously sustained falls, one of which occurred while the resident was on leave, on March 31 and April 1, 2000, but the only caveat on the CNA kardex for the resident was the caution not to leave her on the toilet alone. Ms. Stewart did not consider the supervision and assistance rendered Resident 9 to be adequate. It is so found. Ms. Edwards focused her review on the records of Resident 22 who was not at the facility at the time of the survey. The records indicated the resident had been assessed at a high risk for falls at the time of her admission and a tab alarm was used. However, according to the nurse's notes, on April 10, 2000, the alarm went off causing the resident to lose her balance and fall while in the merry walker. She lacerated her scalp and sustained a large swelling in the occipital area. The only fall assessment of this resident was done when she was admitted to the facility. The evidence does not indicate when this was, but presumably, it was not done timely. There is a requirement that fall assessments be done quarterly, but it cannot be determined when it was done here. Even when, on April 11, 2000, the day after the fall, the physical therapy staff re-screened this resident for a merry walker, no change in care notation was noted in her record or implemented. Resident 22 sustained another fall on April 16, 2000. On this occasion, the resident was found on the floor of the day room, out of the merry walker. There was no indication she was being supervised or monitored at the time of her fall. This time she sustained another head injury just above the old one. After this fall, the facility staff ordered a new merry walker even though there was no indication a different one would provide additional protection. The resident sustained a third fall on April 18, 2000, sustaining another injury to the head which resulted in substantial blood loss. As a result of this fall, she was taken to the hospital. Because of this, she was not present when the survey was done, but based on her review of the resident records, Ms. Edwards concluded that the facility did not provide sufficient supervision or assistive devices to this resident. During the period of the survey, Ms. Gold observed Resident 3 on five separate occasions. On none of them was the resident wearing a Tabs alarm even though the facility's care plan called for one to be used. A falls assessment had been started on the resident but not completed. The record also revealed that the resident fell on March 29, 2000, resulting in a skin tear to the right arm. Based on the above, Ms. Gold concluded that the resident was not provided with adequate care and assistive devices. Resident 10 was a resident with a history of falls both before and after admission to the facility. The resident's care plan called for chair alarms, a merry walker, a safety seat belt, a low bed, and a bike horn. Though Ms. Maisel, the surveyor, observed that the resident had a chair alarm, she did not see that any of the other interventions called for in the plan were provided. She did not ever see the resident with a merry walker, and on at least two occasions, she saw the resident when the chair alarm was not in use. In her opinion, the use of one intervention does not make the use of other interventions unnecessary, and she considers the facility's supervision and assistive device provision to be inadequate. Resident 4 was an individual who had sustained a hip fracture, was senile, and was taking pain medications. The resident required help in getting out of bed or a chair. The care plan for the resident called for the use of a Tabs alarm, but on none of the occasions that Ms. Stewart observed this resident was the tabs alarm in use. She considered the supervision and assistive devices provided by the facility to this resident to be inadequate. Respondent does not contest that the incidents cited by the Agency took place. Rather, it contends that the interventions implemented by it were sufficient. It also disputes the effectiveness of some interventions called for, specifically the Tabs alarms, suggesting that the alarm does not prevent falls and often contributes to them by startling the wearer. There is some evidence to support that claim. Respondent further contends that the safety provided by the use of an intervention device, such as the Tabs alarm, straps, bed rails, or the merry walker, restrictive as they are, must be weighed and evaluated against the loss of dignity of the resident caused by their use. It is also urged by the facility that the use of certain interventions such as Tabs alarms is made unnecessary when the resident is immobile and safety is provided by the use of other interventions such as bed rails, which are more pertinent to the condition of the resident. In the case of Resident 9, the failure to provide for the use of a Tabs alarm when the resident was on leave with her husband was off-set by the one-on-one supervision she received during that period. Respondent contends that falls will occur among residents of the type in issue here regardless of the planning to identify the risks of fall, the efforts made to prevent them, and the implementation and use of interventions designed to avoid them. While this may be so, the facility nonetheless has a duty to provide necessary and adequate supervision and assistive devices to minimize to the greatest extent possible, the risk of injury as the result of falls. In some cases, this was not done here. In support of its position, Respondent presented the testimony of Theresa Vogelspohl, a nursing home consultant and an agreed expert on falls, issues of the elderly, issues of care of the elderly, and nursing practices and standards in nursing homes. Ms. Vogelspohl indicated that as a general practice when patients are admitted to a nursing home they are considered at risk for falls until the facility staff gets to know them. Each facility sets its own standard as to the length of the observation period, during which the residents are studied for their gait and safety awareness. In addition, the residents are evaluated for safety awareness by the staff of the physical and occupational therapy departments. Ordinarily, the assessment includes only the minimum data set (MDS) criteria, but increasingly during the last few years, a separate falls assessment has become common. In addition to the initial assessment, the attending nurses do an independent admissions assessment, and Ms. Vogelspohl found that such an assessment process was followed as to each of the residents in issue here. Ms. Vogelspohl found that an incomplete falls assessment had been done on Resident 3. Based upon her own review of the resident's records, however, had the full assessment been completed, other than the fact that she was a new resident, the resident would have been classified as a low risk for falls. She opines that the failure to complete the falls assessment did not deny the resident any care or a care plan for falls. Ms. Vogelspohl determined that the facility had opted, instead, for a more cautious approach to this resident in the care plan which, in her opinion, was appropriate for a new admission. A care plan is a map for the staff to be made aware of the care being provided and the specific interventions pertinent to the resident. If the resident is at increased risk for falls, the care plan would list the interventions designed to decrease the risk of falls. One of the most significant risk factors for falls is increase in age. Others are disease conditions, medications, cognitive functioning levels, eyesight, and other impairments. The interventions available to a facility to address the issue of risk of falls depend upon the condition of the resident. The first consideration should be the need to maintain a safe physical environment for the resident. Appropriate footwear is important as is the availability of assistive devices such as a cane or walker. If the resident has a history of falls, consideration should be given to changing those factors which were related to the prior falls. Included in that is consideration of different seating or a more frequent toileting schedule. According to Ms. Vogelspohl, the last thing one would want to do is to apply physical restraint, but, if all else has failed, the least restrictive physical or chemical restraint may be necessary to decrease the likelihood of falls. Ms. Vogelspohl emphasizes that only the likelihood of falls can be reduced. It is not possible to prevent all falls. Room cleanliness is not something which should appear in a care plan. It is a given, and nurses know to place furniture in such a way and to reduce clutter to the extent that the resident can safely navigate the room either with a walker or a wheelchair. Obviously, in this case the survey staff concluded the placement of the dirty trays in the hallway and in the resident's room constituted a hazard. In Ms. Vogelspohl's opinion, supervision and monitoring of residents in a nursing home is a basic. That is generally the reason for the resident's being admitted in the first place. While they should be done on a routine basis, supervision and monitoring are still sometimes placed in a care plan, but the failure to have the requirements in black and white is not a discrepancy so long as the appropriate supervision and monitoring are accomplished. The residents most at risk for falls, and those who are the most difficult to manage, are those who have full physical functioning yet who have almost nonexistent cognitive functioning. Ms. Vogelspohl is of the opinion that for these residents, the best intervention is the merry walker. This is better than a regular walker because the resident cannot leave it behind. If the resident is one who falls from bed, then a low bed, with rails if appropriate, is the primary option. A low bed was called for for Resident 10 but was not provided. Ms. Vogelspohl does not have a high opinion of the Tabs alarm because it can cause as many falls as it prevents. It has a place with the cognitively aware resident who will sit back down if she or he hears the alarm sound. More often than not, however, the routine resident will automatically react by trying to get away from the noise, and, thus, be more likely to engage in rapid, impulsive behavior that can lead to a fall. Ms. Vogelspohl considers the use of the Tabs alarm as only one factor in assessing the degree of supervision provided. She looks at the care plan to see if the Tabs alarm even meets the needs of the resident. If the resident is cognitively alert and at no risk of falls, a Tabs alarm is not appropriate. There are other interventions which can be used such as quick release, velcro seat belts which better prevent falls because they provide a resistance when the resident attempts to stand up. To determine whether a care plan has been developed and implemented, Ms. Vogelspohl reviews the record. She looks at the nurse's notes and those of the social services personnel. She evaluates the records of the physical, occupational, and recreational therapy staff. Finally, she reads the resident's chart to see what staff is actually doing to implement the interventions called for in the care plan. However, on the issue of supervision, she does not expect the notes or the record to affirmatively reflect every incident of supervision. There is no standard of nursing practice that she is aware of that calls for that degree of record keeping. What she would expect to see is a record of any kind of unsafe behavior that was observed. By the same token, Ms. Vogelspohl would not expect a facility to document every time it placed an alarm unit on a resident. The units are applied and removed several times a day for bathing, clothing changes, incontinence care, and the like, and it would be unreasonable, she opines, to expect each change to be documented. Further, she considers it inappropriate and insulting to the resident to require him or her to wear an alarm when cognizant and not displaying any unsafe behavior. If a resident who is not cognitively impaired declines intervention, it would, in her opinion, be a violation of that resident's rights to put one on. In that regard, generally, interventions are noted in the resident records when initiated. Usually, however, they are not removed until the quarterly assessment, even though the intervention may be discontinued shortly after implementation. Ms. Vogelspohl took exception to Ms. Edwards' finding fault with the facility for the three falls experienced by Resident 22. The resident was under observation when the first fall occurred, but the staff member was not able to get to the resident quickly enough to catch her when she stood up and immediately toppled over in her merry walker. The resident had been properly assessed and proper interventions had been called for in the care plan. Ms. Vogelspohl attributes the fall to the resident's being frightened by the Tabs alarm going off when she stood up and believes she probably would not have fallen had she not had the tab unit on. The second fall took place while the resident got out of her marry walker in the day room. Though the day room was visible to anyone out in the hallway, the fall was not witnessed, but Ms. Vogelspohl is of the opinion that it is not reasonably possible to keep every resident under constant visual supervision unless an aide can be assigned on a one-on-one basis to every resident. On the third fall, which occurred at about 10 p.m., the staff had put the resident to bed and had put a Tabs unit on her at that time, but the resident had detached the unit and gotten out of bed. There was nothing the staff could do to prevent that. The resident was able to remove the unit no matter how it was affixed to her. Taken together, the actions taken by the facility with regard to this resident were, to Ms. Vogelspohl, appropriate. Some things could have been done differently, such as perhaps using a heavier merry walker, but she did not consider these matters as defects in the care plan, in assessment, in design, or in application. Further, she concluded that the actions taken by the facility subsequent to the first fall on April 10, 2000, wherein the resident's medications were adjusted to compensate for their effect on the resident, constituted a recognition of a change in the resident's condition which was properly addressed. Too much supervision becomes a dignity issue. There is no formula for determining how much supervision is adequate. It is a question of nursing discretion based on the individual resident. An unofficial standard in place within the industry calls for a resident to be checked on every two hours, but rarely will this be documented. Staff, mostly nurses and CNAs, are in and out of the residents' rooms on a regular basis, administering medications and giving treatments. Those visits are documented, but not every visit to a resident's room is. Resident 12, a relatively young man of 62 with several severe medical problems, sustained a fall which resulted in a fractured hip just two weeks after admission to the facility and two weeks before the survey. He was far more mobile than expected. According to the records, he was mostly cognitive intact and had been assessed for falls. As a result of this assessment, the facility developed a care plan to address his risk for falls. Implementation of the plan was difficult, however, because he was aware and could make up his own mind as to what interventions he would accept. As to the resident's April 27, 2000 fall, the only evidence in the file shows that he was found on the floor of his room in front of a straight chair, having sustained a small skin tear in addition to the fracture. From Ms. Vogelspohl's review of the record she could find no indication that the facility had failed to do something that it should have done to prevent the fall. The staff had put a Tabs alarm on the resident, and he removed it. They tried to keep his wheel chair as close to him as possible. They tried to restrict his water intake by giving him thickened liquids to reduce his trips to the rest room. He would pour out the thickened fluids and replace them with water. Because of this resident's mobility, Ms. Vogelspohl does not accept the surveyor's conclusion that the facility did not use Tabs alarms. He was able to get out of them by himself and frequently did. She is also of the opinion, in light of the way the resident behaved, that the blank kardex observed by the surveyor in no way contributed to the resident's fall. The CNA's were aware that the Tabs units were supposed to be used, and Ms. Vogelspohl has concluded that there were no more aggressive interventions that could have been used with this resident. To attempt the use of restraints, either belt or vest, would have been futile because he could have gotten out of them easily. The only other thing Ms. Vogelspohl feels could have been done was to put him in a geriatric psychiatric unit, and this was ultimately done, but not in the Respondent facility. Ms. Vogelpohl also addressed the surveyors' write- ups as they related to Residents 9, 4, 3, and 10. Resident 4 was bed-ridden as a result of Parkinson's Disease and did not need a Tabs alarm, the deficiency cited, while in bed. When seated in a wheel chair, his postural deficits were compensated for by lateral supports and a padded cushion, and she was of the opinion that a Tabs alarm was not required. She opines its absence would not have addressed his risk for falls. His January 2000 fall apparently did not relate to the failure to use a Tabs unit. Resident 3, also the subject of a write-up for failure to use a Tabs alarm, was not, in Ms. Vogelspohl's opinion, at risk for falls because she did not move around a lot due to her physical condition. Nonetheless, she experienced a fall in late March 2000 and shortly thereafter, the facility placed a Tabs alarm on her and made the appropriate entry in her care plan. Resident 9 was ambulatory only with assistance and had a special seating device to keep her in her wheel chair. After the resident sustained two falls close together, a Tabs alarm was placed on her, and from that time until the time of the survey she had no further falls. Ms. Vogelspohl contends that it was an appropriate nursing decision not to place a Tabs unit on her. The rationale for this position is not at all clear. The care plan for Resident 10, also one of the residents observed without a Tabs alarm in place, was described as "somewhat cluttered." It showed multiple interventions initiated as early as April 1999. The initial care plan was crossed through and a new one substituted in September 1999 with the family's concurrence. Nonetheless, Ms. Vogelspohl did not find it too cluttered to be understood. The evidence shows that the resident's chair was outfitted with a soft seat belt and a pressure-sensitive alarm, both of which are considered to be more effective than the Tabs alarm. Ms. Vogelspohl contends that the facility did not ignore the requirement to assess the residents for falls or the requirement to address that issue in care planning. She admits that in some cases, the plan addressing falls prevention was covered in another assessment than the one wherein it might most likely be expected, but it is her contention that if the subject is properly and thoroughly addressed somewhere in the resident's care record, that is sufficient. She considers placing it in several areas to be a redundancy and though it is frequently done so, it is done to meet a paper compliance without having any impact on the quality of care provided.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Agency for Health Care Administration enter a final order sustaining the Conditional license for the Respondent effective April 28, 2000, and, based only on the conditions observed at the facility on that date, imposing an administrative fine of $700.00. DONE AND ENTERED this 22nd day of March, 2001, in Tallahassee, Leon County, Florida. ___________________________________ ARNOLD H. POLLOCK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6947 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 22nd day of March, 2001. COPIES FURNISHED: Christine T. Messana, Esquire Agency for Health Care Administration 2727 Mahan Drive, Mail Stop 3 Tallahassee, Florida 32308 R. Davis Thomas, Jr., Qualified Representative Broad and Cassel 215 South Monroe Street, Suite 400 Post office Box 11300 Tallahassee, Florida 32302-1300 Sam Power, Agency Clerk Agency for Health Care Administration 2727 Mahan Drive Fort Knox Building Three, Suite 3431 Tallahassee, Florida 32308 Julie Gallagher, General Counsel Agency for Health Care Administration 2727 Mahan Drive Fort Knox Building Three, Suite 3431 Tallahassee, Florida 32308

CFR (3) 42 CFR 48342 CFR 483.25(h)(2)42 CFR 483.30 Florida Laws (3) 120.57400.23483.30 Florida Administrative Code (2) 59A-4.10859A-4.1288
# 6
CHARLOTTE HARBOR HEALTHCARE vs AGENCY FOR HEALTH CARE ADMINISTRATION, 02-001917 (2002)
Division of Administrative Hearings, Florida Filed:Punta Gorda, Florida May 03, 2002 Number: 02-001917 Latest Update: Aug. 06, 2003

The Issue The issues for determination are: (1) whether the noncompliance as alleged during the August 30, 2001, survey and identified as Tags F324 and F242, were Class II deficiencies; (2) whether the "Conditional" licensure status, effective August 30, 2001, to September 30, 2001, based upon noncompliance is appropriate; and (3) whether a fine in the amount of $5,000 is appropriate for the cited noncompliance

Findings Of Fact Charlotte is a nursing home located at 5405 Babcock Street, Northeast, Fort Myers, Florida, with 180 residents and is duly licensed under Chapter 400, Part II, Florida Statutes. AHCA is the state agency responsible for evaluating nursing homes in Florida pursuant to Section 400.23(7), Florida Statutes. As such, in the instant case it is required to evaluate nursing homes in Florida in accordance with Section 400.23(8), Florida Statutes (2000). AHCA evaluates all Florida nursing homes at least every 15 months and assigns a rating of standard or conditional to each licensee. In addition to its regulatory duties under Florida law, AHCA is the state "survey agency," which, on behalf of the federal government, monitors nursing homes that receive Medicaid or Medicare funds. On August 27 through 30, 2001, AHCA conducted an annual survey of Charlotte's facility and alleged that there were deficiencies. These deficiencies were organized and described in a survey report by "Tags," numbered Tag F242 and Tag F324. The results of the survey were noted on an AHCA form entitled "Statement of Deficiencies and Plan of Correction." The parties refer to this form as the HCFA 2567-L or the "2567." The 2567 is the document used to charge nursing homes with deficiencies that violate applicable law. The 2567 identified each alleged deficiency by reference to a Tag number. Each Tag on the 2567 includes a narrative description of the allegations against Charlotte and cites a provision of the relevant rule or rules in the Florida Administrative Code violated by the alleged deficiency. To protect the privacy of nursing home residents, the 2567 and this Recommended Order refer to each resident by a number (i.e., Resident 24) rather than by the name of the resident. AHCA must assign a class rating of I, II or III to any deficiency that it identifies during a survey. The ratings reflect the severity of the identified deficiency, with Class I being the most severe and Class III being the least severe deficiency. There are two Tags, F242 and F324 at issue in the instant case, and, as a result of the August 2001 survey, AHCA assigned each Tag a Class II deficiency rating and issued Charlotte a "Conditional" license effective August 30, 2001. Tag F242 Tag F242 generally alleged that Charlotte failed to meet certain quality of life requirements for the residents, based on record review, group interviews, and staff interviews, and that Charlotte failed to adequately ensure that the residents have a right to choose activities that allow them to interact with members of the community outside the facility. On or about August 24, 2001, AHCA's surveyors conducted group interviews. During these interviews, 10 of 16 residents in attendance disclosed that they had previously been permitted to participate in various activities and interact with members of the community outside the facility. They were permitted to go shopping at malls, go to the movies, and go to restaurants. Amtrans transportation vans were used to transport the residents to and from their destinations. The cost of transportation was paid by Charlotte. An average of 17 to 20 residents participated in those weekly trips to dine out with other community members at the Olive Garden and other restaurants. During those trips, Charlotte would send one activity staff member for every four to six residents. The record contains no evidence that staff nurses accompanied those select few residents on their weekly outings. The outings were enjoyed by those participants; however, not every resident desired or was able to participate in this particular activity. Since 1985, outside-the-facility activities had been the facility's written policy. However, in August 2000, one year prior to the survey, Matthew Logue became Administrator of the facility and directed his newly appointed Activities Director, Debbie Francis, to discontinue facility sponsored activities outside the facility and in its stead to institute alternative activities which are all on-site functions. Those residents who requested continuation of the opportunity to go shopping at the mall or dine out with members of the community were denied their request and given the option to have food from a restaurant brought to the facility and served in-house. The alternative provided by the facility to those residents desiring to "interact with members of the community outside the facility" was for each resident to contact the social worker, activity staff member, friends or family who would agree to take them off the facility's premises. Otherwise, the facility would assist each resident to contact Dial-A-Ride, a transportation service, for their transportation. The facility's alternative resulted in a discontinuation of all its involvement in "scheduling group activities" beyond facility premises and a discontinuation of any "facility staff members" accompanying residents on any outing beyond the facility's premises. As described by its Activities Director, Charlotte's current activities policy is designed to provide for residents' "interaction with the community members outside the facility," by having facility chosen and facility scheduled activities such as: Hospice, yard sales, barbershop groups for men and beautician's day for women, musical entertainment, antique car shows, and Brownie and Girl Guides visits. These, and other similar activities, are conducted by "community residents" who are brought onto the facility premises. According to the Activities Director, Charlotte's outside activities with transportation provided by Amtrans buses were discontinued in October of 2000 because "two to three residents had been hurt while on the out trip, or on out-trips."1 Mr. Logue's stated reason for discontinuing outside activities was, "I no longer wanted to take every member of the activities department and send them with the resident group on an outing, thereby leaving the facility understaffed with activities department employees." The evidence of record does not support Mr. Logue's assumption that "every member of the facility's activities department accompanied the residents on any weekly group outings," as argued by Charlotte in its Proposed Recommended Order. Charlotte's Administrator further disclosed that financial savings for the facility was among the factors he considered when he instructed discontinuation of trips outside the facility. "The facility does not sponsor field trips and use facility money to take people outside and too many staff members were required to facilitate the outings." During a group meeting conducted by the Survey team, residents voiced their feelings and opinions about Charlotte's no longer sponsoring the field trips on a regular basis in terms of: "feels like you're in jail," "you look forward to going out," and being "hemmed in." AHCA's survey team determined, based upon the harm noted in the Federal noncompliance, that the noncompliance should be a State deficiency because the collective harm compromised resident's ability to reach or maintain their highest level of psychosocial well being, i.e. how the residents feel about themselves and their social relationships with members of the community. Charlotte's change in its activities policy in October of 2000 failed to afford each resident "self- determination and participation" and does not afford the residents the "right to choose activities and schedules" nor to "interact with members of the community outside the facility." AHCA has proved the allegations contained in Tag F242, that Charlotte failed to meet certain quality of life requirements for the residents' self-determination and participation. By the testimonies of witnesses for AHCA and Charlotte and the documentary evidence admitted, AHCA has proven by clear and convincing evidence that Charlotte denied residents the right to choose activities and schedules consistent with their interests and has failed to permit residents to interact with members of the community outside the facility. Tag F324 As to the Federal compliance requirements, AHCA alleged that Charlotte was not in compliance with certain of those requirements regarding Tag F324, for failing to ensure that each resident receives adequate supervision and assistance devices to prevent accidents. As to State licensure requirements of Sections 400.23(7) and (8), Florida Statutes (2000), and by operation of Florida Administrative Code, Rule 59A-4.1288, AHCA determined that Charlotte had failed to comply with State established rules, and under the Florida classification system, classified Tag F324 noncompliance as a Class II deficiency. Based upon Charlotte's patient record reviews and staff interviews, AHCA concluded that Charlotte had failed to adequately assess, develop and implement a plan of care to prevent Resident 24 from repeated falls and injuries. Resident 24 was admitted to Charlotte on April 10, 2001, at age 93, and died August 6, 2001, before AHCA's survey. He had a history of falls while living with his son before his admission. Resident 24's initial diagnoses upon admission included, among other findings, Coronary Artery Disease and generalized weakness, senile dementia, and contusion of the right hip. On April 11, 2001, Charlotte staff had Resident 24 evaluated by its occupational therapist. The evaluation included a basic standing assessment and a lower body assessment. Resident 24, at that time, was in a wheelchair due to his pre-admission right hip contusion injury. On April 12, 2001, two days after his admission, Resident 24 was found by staff on the floor, the result of an unobserved fall, and thus, no details of the fall are available. On April 23, 2001, Resident 24 was transferred to the "secured unit" of the facility. The Survey Team's review of Resident 24's Minimum Data Set, completed April 23, 2001, revealed that Resident 24 required limited assistance to transfer and to ambulate and its review of Resident 24's Resident Assessment Protocols (RAPs), completed on April 23, 2001, revealed that Resident 24 was "triggered" for falls. Charlotte's RAP stated that his risk for falls was primarily due to: (1) a history of falls within the past 30 days prior to his admission; (2) his unsteady gait; (3) his highly impaired vision; and (4) his senile dementia. On April 26, 2001, Charlotte developed a care plan for Resident 24 with the stated goal that the "[r]esident will have no falls with significant injury thru [sic] July 25, 2001," and identified those approaches Charlotte would take to ensure that Resident 24 would not continue falling. Resident 24's care plan included: (1) place a call light within his reach; (2) do a falls risk assessment; (3) monitor for hazards such as clutter and furniture in his path; (4) use of a "Merry Walker" for independent ambulation; (5) placing personal items within easy reach; (6) assistance with all transfers; and (7) give Resident 24 short and simple instructions. Charlotte's approach to achieving its goal was to use tab monitors at all times, to monitor him for unsafe behavior, to obtain physical and occupational therapy for strengthening, and to keep his room free from clutter. All factors considered, Charlotte's care plan was reasonable and comprehensive and contained those standard fall prevention measures normally employed for residents who have a history of falling. However, Resident 24's medical history and his repeated episodes of falling imposed upon Charlotte a requirement to document his records and to offer other assistance or assistive devices in an attempt to prevent future falls by this 93-year-old, senile resident who was known to be "triggered" for falls. Charlotte's care plan for Resident 24, considering the knowledge and experience they had with Resident 24's several falling episodes, failed to meet its stated goal. Charlotte's documentation revealed that Resident 24 did not use the call light provided to him, and he frequently refused to use the "Merry Walker" in his attempts of unaided ambulation. On June 28, 2001, his physician, Dr. Janick, ordered discontinuation of the "Merry Walker" due to his refusal to use it and the cost involved. A mobility monitor was ordered by his physician to assist in monitoring his movements. Charlotte's documentation did not indicate whether the monitor was actually placed on Resident 24 at any time or whether it had been discontinued. Notwithstanding Resident 24's refusal to cooperatively participate in his care plan activities, Charlotte conducted separate fall risk assessments after each of the three falls, which occurred on April 12, May 12, and June 17, 2001. In each of the three risk assessments conducted by Charlotte, Resident 24 scored above 17, which placed him in a Level II, high risk for falls category. After AHCA's surveyors reviewed the risk assessment form instruction requiring Charlotte to "[d]etermine risk category and initiate the appropriate care plan immediately," and considered that Resident 24's clinical record contained no notations that his initial care plan of April 23, 2001, had been revised, AHCA concluded that Charlotte was deficient. On May 13, 2001, Dr. Janick visited with Resident 24 and determined that "there was no reason for staff to change their approach to the care of Resident 24." Notwithstanding the motion monitors, on June 17, 2001, Resident 24 fell while walking unaided down a corridor. A staff member observed this incident and reported that while Resident 24 was walking (unaided by staff) he simply tripped over his own feet, fell and broke his hip. Charlotte should have provided "other assistance devices," or "one-on-one supervision," or "other (nonspecific) aids to prevent further falls," for a 93-year-old resident who had a residential history of falls and suffered with senile dementia. Charlotte did not document other assistive alternatives that could have been utilized for a person in the condition of Resident 24. AHCA has carried its burden of proof by clear and convincing evidence regarding the allegations contained in Tag F324.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: The Agency enter a final order upholding the assignment of the Conditional licensure status for the period of August 30, 2001 through September 30, 2001, and impose an administrative fine in the amount of $2,500 for each of the two Class II deficiencies for a total administrative fine in the amount of $5,000. DONE AND ENTERED this 13th day of February, 2003, in Tallahassee, Leon County, Florida. FRED L. BUCKINE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 2003.

CFR (2) 42 CFR 48342 CFR 483.15(b) Florida Laws (4) 120.569120.57400.23409.175
# 7
MARY HARRISON vs. BOARD OF NURSING HOME ADMINISTRATORS, 81-002138 (1981)
Division of Administrative Hearings, Florida Number: 81-002138 Latest Update: Nov. 05, 1990

The Issue Whether or not the Respondent properly denied Petitioner's application for examination as a nursing home administrator.

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, the documentary evidence received, posthearing memoranda, and the entire record compiled herein, the following relevant facts are found. Petitioner, Mary Harrison, filed an application to sit for the examination as a nursing home administrator on approximately May 28, 1981, based on her belief that she satisfied the prerequisite for examination as required by Rule Chapter 21Z-11.01, Florida Administrative Code. In a cover letter with her application dated May 28, 1981, Petitioner asserted her position that she satisfied the above requirements by stating that she was over 18 years of age; was a high school graduate; had completed two (2) years of college level studies which prepared her for health administration, in that she held a master's degree in public administration (a program designed for administration in the field of human services with a specialty in human resource management) ; was of good moral character and possessed four (4) years experience in nursing home and two and one half (2 1/2) years experience at Hospice in a management/administrative capacity. 3/ Petitioner's application was preliminarily denied by letter dated July 6, 1981, from the Board on the grounds that Petitioner's degree in public administration was not in the field of health care administration as required by Rule 21Z-11.07, Florida Administrative Code, and additionally, that Petitioner's experience "did not appear to demonstrate that for four (4) years (she) had been in a position of control and administration as needed to fulfill the requirements of Rule 21Z-11.09, Florida Administrative Code Petitioner attended a subsequent Board meeting where her application was considered on July 24, 1981, and she was afforded an opportunity to present a more detailed description of her executive and management responsibilities for its (the Board's) consideration. The Board again denied Petitioner's application, which denial was memorialized in a letter dated July 27, 1981, and cited, as basis for the denial, that Petitioner failed to show that her responsibilities and experience involved the total health services as required by Rule 21Z-11.09, Florida Administrative Code. Petitioner was advised, in that letter, that she may request a hearing which resulted in the instant proceeding before the Division by a letter of transferal from the Board on August 27, 1981. During the four (4) year period from 1976 through 1980, Petitioner was employed as the Director of Social Services at the Boca Raton Convalescent Center, Boca Raton, Florida. The Center is a nursing home. Petitioner's responsibilities included coordination of admissions and discharges, individual and family counseling, development of social work internship programs with the Florida Atlantic University School of Social Welfare and the training and supervision of social work interns who were involved in the Reality Orientation Program. Petitioner's supervision only included social workers and interns in her department and she was not responsible for employees in other departments of the facility. Petitioner participated in what has been described as a team- management system at the Center. Petitioner's involvement in that system included discussions of various courses of action in the interviewing of employees by a search committee which consists of a group of department heads and the Center's administrator. Petitioner did not sign contracts or purchase orders for any services or supplies; she did not sign checks or make any decisions affecting the employment of the staff at the Center such as hiring, firing, layoff, recall suspension or the imposition of disciplinary sanctions. The accounting decisions for the Center were made at a regional office and the Petitioner's involvement in the accounting decisions consisted primarily of reguesting certain items when a budget proposal was made to the regional office and the placing of certain numbers on forms, which had to conform within the framework of the finalized budget as prepared by the Center's regional office. During the above four (4) year period, Petitioner served as Acting Administrator for the Center for one weekend of every five or six weeks where she was authorized to exercise managerial authority temporarily and primarily in cases of emergencies. In this regard, evidence reveals that the Administrator was, even in these instances, still responsible for the exercise of emergency administrative authority by Petitioner while she served as the Acting Administrator. (Testimony of Petitioner and witnesses Melican, Cohen and Lane.) To performing her regular duties as nursing home administrator at the Center, Petitioner exercised the management skills and the executive duties of planning, directing, staffing, organizing and controlling only the social services department. Since early 1980 to present, Petitioner has served as a member of the Board of Directors and a founder of the Florida State Hospice Organization. During her affiliation with the Hospice of Boca Raton, Petitioner performed executive functions for two (2) years at twenty (20) hours per week and one (1) year at thirty-five (35) hours per week. During her affiliation with the Hospice, Petitioner was responsible for and has provided input for the articulation of rules and regulations governing Hospice facilities statewide. Petitioner has also served on resource committees affiliated and/or approved by Respondent for the development of standards to provide and assure quality Hospice care statewide. In the performance of her duties in the Hospice of Boca Raton, Petitioner has exercised management skills and executive duties which include planning, directing, staffing, controlling and organizing that facility.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Respondent, State of Florida, Department of Professional Regulation, Board of Nursing Home Administrators, deny petitioner's application to sit for the licensing examination in nursing home administration. RECOMMENDED this 1st day of March, 1982, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 1982.

Florida Laws (1) 120.57
# 8
WUESTHOFF HEALTH SERVICES, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 85-002868 (1985)
Division of Administrative Hearings, Florida Number: 85-002868 Latest Update: Jan. 26, 1987

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED That Manor Care be issued a CON for the construction of a 60 bed nursing home; Palm Bay Care Center be awarded a CON for the construction of a 60 bed nursing home; Forum Group be awarded a CON for a 40 bed nursing home and Courtenay Springs be awarded a CON for 36 nursing home beds. RECOMMENDED this 26th day of January, 1987, at Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-99675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of January, 1987. COPIES FURNISHED: William Page, Jr., Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 Jean Laramore, Esquire Kenneth Hoffman, Esquire 325 North Calhoun Street Tallahassee, Florida 32301 Thomas B. Smith, Esquire Post Office Box 633 Orlando, Florida 32802 John Grout, Esquire Post Office Box 180 Orlando, Florida 32802 Donna H. Stinson, Esquire Suite 100 Perkins House 118 North Gadsden Street Tallahassee, Florida 32301 Susan G. Tuttle, Esquire 402 South Florida Avenue Tampa, Florida 33602 Robert D. Newell, Jr., Esquire Suite B 200 South Monroe Street Tallahassee, Florida 32301 John F. Gilroy, Esquire Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 APPENDIX The following constitutes my specific rulings pursuant to Section 120.57(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties herein. 1-13 Accepted. 14 & 15 Accepted. 16-18 Rejected as a recitation of the evidence. 19-23 Accepted. 24 Accepted. 25-29 Accepted. 30 & 31 Accepted. 32 Irrelevant. 33-34 Accepted. 35-37 Accepted. 38-46 Accepted. 47 & 48 Accepted. 49 & 50 Accepted. 51 Discussion, not Finding of Fact. 52-56 Accepted. Rejected as a recitation of the evidence. Accepted. Accepted to the fact that there were no sheltered beds in existence. Irrelevant. 61-63 Accepted but not of substantial positive value. 64 & 65 Accepted. Opinion not Finding of Fact. Accepted. 68-75 Accepted. 76-80 Irrelevant based on part operation and evidence shows facility is to be sold. 81-85 Irrelevant - see next 86-90 Rejected as a conclusion of law and not a Finding of Fact. 91 Not a Finding of Fact. 92-94 Accepted. 95 Irrelevant as to local district. 96-103 Accepted. 104-105 Rejected as contrary to the weight of the evidence. Accepted as to what Dr. Hoffman supported. Accepted as to what Dr. Hoffman indicated. 108-110 Accepted. Rejected as contrary to the weight of the evidence. Accepted. Not a Finding of Fact. 114-118 Accepted. 119&120 Not a Finding of Fact. 121&122 Accepted. 123 Accepted as to the one facility currently operated. 124-127 Accepted. Speculation insufficient to support a Finding of Fact. Argument, not a Finding of Fact. Accepted. 131-133 Accepted. 134 Not a Finding of Fact. 135-137 Accepted. 138 Not supported by the weight of the evidence. 139-147 Accepted. 148&149 Not a Finding of Fact. 150-164 Accepted. Rejected as a summary of testimony, not a Finding of Fact. Irrelevant. 167-176 Accepted. Rejected as contrary to the weight of the evidence Rejected as a summary of testimony. Accepted. 180&181 Accepted. 182 Irrelevant. 183&184 Accepted. 185 Rejected as a conclusion. 186&187 Rejected as contrary to the weight of the evidence. As to Manor Care 1 Accepted. 2&3 Rejected as not a part of the case. 4 Accepted. 5-7 Accepted. Accepted. Accepted. 10-11 Accepted. 12 Accepted. 13-19 Accepted. 20-22 Accepted. As to Forum 1-13 Accepted. 14-16 Accepted. 17-22 Accepted. 23&24 Accepted. 25-27 Accepted. 28-31 Accepted. 32 Accepted. 33-35 Accepted. 36 Rejected as speculation. 37-42 Accepted. 43 Accepted. 44-47 Accepted. 48&49 Accepted. 50-55 Accepted. Rejected as a conclusion not consistent with the evidence. Accepted. 58&59 Accepted. 60-64 Accepted. 65-69 Accepted. 70&71 Irrelevant. 72&73 Accepted. 74-76 Accepted. Accepted as to the first sentence. Second sentence is not a Finding of Fact. Accepted. As to PBCC 1&2 Accepted. 3 Rejected as a Conclusion of Law. 46 Accepted. Accepted. Rejected as contrary to the weight of the evidence. Accepted. 10-12 Accepted. Rejected as contrary to the weight of the evidence except for the first sentence which is accepted. Rejected. 15-20 Accepted. 21-27 Accepted. 28 Rejected as an overstatement and not supported by the evidence. 29&30 Accepted. 31 Rejected as contrary to the weight of the evidence. 32-38 Accepted. 39-43 Accepted. 44-50 Accepted. 51-57 Accepted. Accepted except for the first sentence which is unsupported by credible evidence of record. Accepted. Rejected. Accepted. As to Courtenay This party failed to number or otherwise identify its Findings of Fact individually. Therefore, no specific ruling as to each Finding of Fact is hereby made. In light of the ultimate recommendation of the Hearing Officer that the party's CON be approved, no prejudice to this party can be said to have occurred. As to DHRS 1-4 Accepted 5 Summary of testimony and not a Finding of Fact. 6-1 Is an argument of the party's position, not a Finding of Fact. 12-14 Rejected as matters not a part of the party's position at hearing. Accepted. Accepted. Accepted. Accepted. 19-22 Accepted. Rejected as a summary of testimony and not a Finding of Fact. Accepted. 25-28 Accepted. 29-31 Accepted.

Florida Laws (1) 120.57
# 9
MANOR CARE OF FLORIDA, INC., D/B/A MANOR CARE OF PALM HARBOR vs. MAPLE LEAF OF HILLSBOROUGH COUNTY AND DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-003409 (1987)
Division of Administrative Hearings, Florida Number: 87-003409 Latest Update: Nov. 14, 1988

The Issue The issue in this proceeding is whether DHRS should approve the application for certificate of need of any one or more of the January, 1987, applicants for community nursing home beds in Hillsborough County. STIPULATIONS The parties stipulated to the following facts: All applicants timely filed their respective letters of intent, applications and omission responses with DHRS and the appropriate local health council for the January, 1987, batching cycle. The petitioners each timely filed a petition requesting a Section 120.57(1) hearing and have standing in this proceeding. The parties agree the Division of Administrative Hearings has jurisdiction over this matter and the parties. The CON application content requirements of Section 381.494, Florida Statutes (1985), apply as that was the statute in effect at the time the applications were filed. The review criteria in Section 381.705(1) and (2), Florida Statutes (1987), apply to this proceeding. The following statutory criteria have been met orare not applicable in this proceeding: Section 381.705(1)(d), (f), (g), (j) and (k) and all of Section 381.705(2), Florida Statutes (1987). Except for the effects the project will have on clinical needs of health professional training programs, the extent to which services will be accessible to schools for health professionals and the availability of alternative uses of such resources for the provision of other health services, Section 381.705(1)(h) is in dispute and remains to be litigated.

Findings Of Fact SUMMARY DESCRIPTION OF THE PARTIES. HCR's application (CON Action No. 5000) is to construct a 120-bed nursing home consisting of 40,000 square feet at a cost of $3,964,000.00, or $33,033 per bed (including adult day care; $32,1127 when the cost for day care is excluded.) The HCR application describes special programs and services for Alzheimer's Disease and related disorder patients in a distinct special care unit and an Alzheimer's day care center, both Identified in the plans submitted by HCR showing special design elements. HCR also proposes to offer sub-acute care and respite care. The HCR nursing home will have 2.08 (120/57.6) patients per staff, which includes the assistant director of nursing and occupational therapy and recreational therapy aides listed by HCR in its application. FCP submitted an application for 30 nursing home beds to be constructed as a part of a retirement facility (CON Action NO. 4993). The 30 beds will comprise approximately 17,558 square feet at a cost of $1,549,599.00, or $51,653 per bed. The Florida Country Place application proposes a patient staff ratio of approximately 2.3 (30/13). Palm Court submitted an application for a 60-bed addition to its existing 120-bed facility (CON Action No. 4987). The 60-bed addition would consist of 15,260 square feet at a cost of $1,472,435.00, or $24,571 per bed. The Palm Court facility is located in Plant City in the far eastern portion of Hillsborough County, near the Polk County line. Palm Court proposed a ratio of 2.31 (60/26) patients per nursing staff. Manor Care submitted an application (CON Action No. 5006) to add 60 beds to an approved certificate of need for 60-beds for which construction has not yet begun. The area to be added would consist of 19,000 square feet at a cost of $2,187,045.00, or $36,451 per bed. The Manor Care addition would include a distinct special care unit for Alzheimer's Disease and related disorder victims and the 60-bed addition would provide a patient staff ratio of 1.98 (60/30.3), which includes a half-time physical therapy aide, a half-time recreational therapy assistant and an assistant director of nursing. Forum submitted an application (CON Action No. 4999) to construct a 120-bed nursing home as a part of a retirement complex. The nursing home element will consist of 49,283 square feet at a cost of $5,053,301.00, or $42,111 per bed. Forum proposes a staffing ratio of 3.0 patients per staff FTE. Forum proposed to provide respite care and hospice care, and adult day care and meals on wheels during or after the second year of operation. HHL submitted an application (CON Action No. 4978) for 120-bed nursing home consisting of 37,700 square feet at a cost of $3,900,000.00, or $32,500 per bed. The HHL facility proposes 2.27 (120/52.8) patients per staff, which includes the rehabilitation assistants and the assistant director of nursing listed by HHL. HHL proposes sub-acute care, respite care, programs for Alzheimer's Disease victims (but not a distinct special care unit) and an Alzheimer's adult day care program of from four to six patients. Cypress submitted an application (CON Action No. 5004) to construct a 60-bed nursing home in Sun City Center in southeastern Hillsborough County. The nursing home described in the application would contain 24,069 square feet at a cost of $2,125,000.00, or $35,419 per bed. But Cypress' estimated construction cost per square foot of $49.81 does not account for inflation and is unreasonably low. Median cost of nursing home construction in Florida is $55 per square foot. It is estimated that Cypress' construction cost estimate is 10-15 percent too low. Assuming that the cost estimate is 12.5 percent too low, the cost of construction would increase to approximately $2,274.485 or $37,914 per bed. Cypress did not detail any special programs in its application and proposed 2.45 (60/24.5) patients per staff. However, this ratio is questionable in view of the confusion surrounding Cypress' evidence regarding staffing and the apparent inaccuracy of the staffing presented by the application. DHRS is the state agency that preliminarily reviewed and passed on the applications and is responsible for final agency action on them. DHRS PRELIMINARY REVIEW AND ACTION. HCR, FCP, Palm Court, Manor Care, Forum, HHL, Cypress, and others filed their applications for community nursing home bed certificates of need for Hillsborough County in the January, 1987, batching cycle. On June 18, 1987, DHRS issued its State Agency Action Report (SAAR), in which it denied all of the applications except HCR's, FCP's and VHA/Oxford's (for 120 beds). Review of the SAAR in light of the evidence introduced at the final hearing indicates that DHRS erred in reviewing the applications in at least the following respects: Manor Care. -- The SAAR indicates that DHRS was not cognizant that Manor Care had a final approval for a 60-bed nursing home CON (No. 4155) to which to add the 60 beds applied for in this case, CON Action No. 5006. The SAAR was somewhat critical of the Manor Care proposal for being a two-story structure. It appears that DHRS confused the proposal to add 60-beds (CON Action No. 5006) with a parallel contingent proposal to build a new 120-bed facility (CON Action No. 5005), which Manor Care eventually withdrew during the final hearing. Actually, CON Action No. 5006, added to the approved CON No. 4155 for a new 60-bed nursing home, would result in a one-story 120-bed nursing home. On page 7 of the SAAR, DHRS indicated its understanding that Manor Care had not specified a location for its proposal. Later, on page 11, the SAAR acknowledges the true fact that Manor Care's proposed nursIng home would be located in the Northwest Hillsborough County subdistrict, which is the Local Health Plan's first priority for location of additional nursing home beds in DHRS District 6. HHL. The SAAR (p. 13) states that Convalescent Services, Inc. (CSI), the management corporation HHL and other limited partnerships for which the Kellett Brothers are the general partners, has no other nursing homes in Florida. While technically correct, Kellett limited partnerships do have other nursing homes in Florida. Staffing tables on page 17 of the SAAR are incorrect, attributing no LPNs to the HHL proposal instead of 6 and only 36 aides instead of 38. On page 18 of the SAAR, the table of patient privileges incorrectly states that the HHL applications had no patients' bill of rights. Also on page 18 of the SAAR, DHRS incorrectly omitted adult day care and community outreach from the table of programs provided by HHL. On page 26 of the SAkR, it gives HHL's private pay private room rate ($101) as its semi-private room rate (actually $69.92) The SAAR Review Matrix incorrectly omits adult day care, community outreach and sub-acute care from HHL's proposed programs and omits HHL's patients' bill of rights. Forum. -- The SAAR starts out on page 3 by misidentifying Forum as being affiliated with Hospital Corporation of America. On pages 4, 6 and 15, the SAAR incorrectly fails to recognize that a retirement living center (apartments) is part of the overall development Forum proposes. The semi-private room rate of $110 attributed to Forum's application on page 26 of the SAAR is wrong; it should have been $85. Cypress. -- The Review Matrix in the SAAR failed to identify several services and programs Cypress stated in its application that it would offer. The matrix did not recognize that Cypress would offer social activity functions within the community, would offer rehabilitation, would provide some Alzheimer's type services, (which Cypress called supportive care and mentally frail services) and physically frail services. Cypress also spoke of hospice care and respite care in its application, as well as specialized rehabilitation, physical therapy, and speech therapy. Cypress also spoke of community outreach programs, psychiatric services, home health agencies, and numerous other areas that were not recognized by DHRS in its matrix. However, there are valid reasons for some of these omissions. On May 9, 1988, the first day of the final hearing, VHA/Oxford withdrew its application. On the afternoon of May 17, 1988, DHRS announced it was supporting the grant of Palm Court's application since VHA/Oxford had withdrawn. But the only evidence to support the new DHRS position was through the testimony of Reid Jaffe, DHRS Health Services and Facilities Consultants Supervisor, who did not express a personal opinion but acted as a messsenger to relay the positions taken by others at DHRS who did not testify. NUMERIC NEED. Rule 10.5.011(1)(k), Florida Administrative Code, is a methodology for calculating net numeric need for nursing home beds. Under the methodology, gross numeric need is calculated essentially by multiplying the population of two age cohorts projected on the planning horizon by a use rate. The use rate is calculated by divIding current population by the current number of licensed beds. To obtain net need in a health planning sub-district, the methodology first prorates the gross need in the entire district, using the proportion of current licensed beds in the subdistrict to the current licensed beds in the district, and adjusts the resultant by a current occupancy rate factor (occupancy rate /0.90); then, the number of licensed beds, plus 90 percent of the number of approved beds in the subdistrict, are subtracted from the adjusted gross need in the subdistrict. With three exceptions, the parties agree on how net numeric need is calculated under the rule methodology. The parties disagree only on the current licensed bed count, the current approved bed count, and the occupancy rate at one facility that has both community nursing home beds and sheltered nursing home beds. (Sheltered nursing home beds generally are not factored into the formula.) As for the licensed bed count, the issue is whether The Home Association, a 96-bed facility in Hillsborough County, should be included as a licensed community nursing home facility or excluded as a sheltered facility. At hearing, all of the parties presenting evidence on the issue except Forum counted The Home Association's 96 beds as licensed community beds. Forum excluded The Home Association from the licensed bed count because it was not listed on the Department's Community Nursing Home Report for January 1, 1988. This same report reflects three other facilities in Hillsborough County in which the beds were formerly sheltered but as of August 1, 1987, began to be counted by the Department as community beds. Forum conceded, however, that if the Department recognizes The Home Association as a community facility, then it would be appropriate to include those beds in the licensed bed count under the rule formula. In its proposed recommended order, even Forum agrees that The Home Association beds are included in the licensed bed count. Two issues are presented relating to the inventory of approved beds under the rule formula: the date at which approved beds are to be counted; and whether the 120 beds under Careage CON #4714 and Manor Care's 60 beds under CON #4155 were approved at the pertinent time. On the first question, Forum again stands alone. In the face of a rule which is silent as to the date on which approved beds are to be counted, Forum suggests that they be counted cn the same day licensed beds are counted, December 1, 1986, for this batch. All other interested parties follow the Department's general practice of counting approved beds as of the date the State Agency Action Report for this batch was executed, June 18, 1987. Forum supports its position on the ground that use of the same date for both licensed and approved beds avoids the prospect that beds may be "lost" from the calculation if they are not licensed as of December 1, 1986, but become licensed before June 18, 1987, and therefore are no longer approved beds on that latter date. The argument is meritless. There is no evidence of any "lost" beds under this policy for this batch. Indeed, the evidence is that such beds are not lost: 120 beds at Carrollwood were licensed on December 15, 1986, after the December 1 licensed bed cut-off and before the June 18, 1987, SAAR date. These beds were included in the approved bed inventory on June 18, 1987. The Department's policy under its numeric need rule is to count approved beds as of the execution date of the SAAR. Under this policy, the need for beds in the future is predicated on the number of beds currently or soon to be available to meet the need. When more than seven months can elapse after licensed beds are counted but before the agency decision is formulated, it makes sense to count beds approved during this intervening period. A 120-bed award to Careage in the prior batch was published by DHRS in the Florida Administrative Weekly of January 23, 1987, reflecting approval on January 7, 1987. However, DHRS then received criticism.of the approval, and a new supervisor in charge initiated a second review of the circumstances and of the Careage approval. The second review did not conclude until after June 18, 1987. When it did, DHRS re- affirmed its decision to approve Careage and issued a CON for 120 beds on August 18, 1987. Although the Careage CON was issued after June 18, 1987, DHRS proved that there is a rational basis for including it in the approved bed count under these unusual circumstances. The Careage CON represents 120 beds approved in the batching cycle preceding the one at issue in this case. Counting the 120 beds as approved promotes sound health planning. The projection of net need on the planning horizon is predicated on the most accurate count of approved beds from prior batching cycles that can be anticipated to come on line in the near future. As of June 18, 1987, there were 308 other beds approved but not yet licensed in Hillsborough County. Included among these 308 approved beds are 60 beds awarded to Manor Care under CON 4155 by Stipulation dated March 30, 1987. By mistake, DHRS did not count Manor Care's 60-bed CON in the SAAR. This mistake was not discovered, and DHRS served discovery responses and took a final position on need, as required by prehearing orders, that did not count the Manor Care CON. But this mistake f fact should now be corrected, even if it could have been discovered earlier through the use of due diligence, so that the health planning decision resulting from these de novo proceedings will be predicated on the correct facts. See Gulf Court Nursing Center v. HRS, 483 So.2d 700, 712 (Fla. 1st DCA 1986). It is appropriate to include Manor Care's finally approved 60 beds in the rule formula. Adding Careage's 120 beds, the total approved bed count is 428. The final variation accounting for the differences in the parties' calculations under the formula is the manner in which the occupancy rate should be computed at John Knox Village, a facility containing both community and sheltered beds. The issue is whether the patient days in this mixed facility should be prorated between the two types of beds or whether the full patient days for both types of beds should be used in calculating the occupancy rate in the facility. There is no separate report of occupancy by bed type for this mixed facility. The number of patient days delivered in the community beds at John Knox is not known. If the patient days for the entire facility are prorated according to the percentage the community beds bear to the total number of beds, there is a necessary but wholly unsupported and speculative assumption that the proportion of patient days delivered in community beds is identical to the proportion of community beds. DHRS historically has been unwilling to make this assumption and has always included the total number of beds and patient days in mixed facilities to determine the occupancy rate under the community bed rule. The rationale supporting this policy has been appropriately explicated on the record. The use of prorated patient days to determine occupancy in mixed facilities, as suggested by DHRS for the first time at final hearing, also is a change from the position the Department took when exhibits were exchanged and the prehearing stipulation was executed and then relied on by the parties. Because the Department, as a party litigant, did not prorate in its prehearing submissions, it cannot do so at hearing in the absence of fraud, mistake of fact, or newly discovered evidence. No evidence of any such extenuating circumstances was presented. The only explanation DHRS gave for changing its treatment of the John Knox occupancy data was that more accurate recent data (using daily census data instead of first day of the month census data) furnished by the Local Health Council was prorated. But DHRS just as easily could have prorated the older, less accurate data if it had chosen to take that position at the time the parties were required to take final positions in prehearing procedures. The Department, therefore, is precluded from adopting a posture at hearing relating to the treatment of patient days in mixed facilities which is different from that reflected in the Department's prehearing stipulation and exchanged exhibits. In summary, the appropriate numeric need calculation must include The Home Association in licensed beds, count both Careage's 120-bed CON and Manor Care's 60-bed CON in the approved bed count, and use the full John Knox bed complement and patient days in determining the Hillsborough County occupancy rate. Using these factors in the rule methodology, the net need for community nursing home beds in Hillsborough County for the January, 1990, planning horizon is 231, as reflected in the calculation included in the attached Appendix To Recommended Order, Case Nos. 87-3409, etc. Rule 10-5.011(1)(k), Florida Administrative Code, provides that DHRS normally may not approve more beds than the numeric net need calculated under rule methodology. In this case, none of the circumstances specified in the rule that would justify exceeding the numeric net need were proven by the evidence. At the same time, the rule does not require DHRS to fill all, or as much as possible, of the numeric net need by attempting to "mix and match" applications to come as close as possible to the calculated number. LOCAL GEOGRAPHIC NEED PRIORITIES. The current, 1985 District VI Local Health Plan provides that, after consideration of numeric bed need under the rule need methodology, its "priority need rankings" should be considered in the competitive review for new nursing homes. Hil1sborough County, Northwest, is priority rank number one. HCR, FCP, Manor Care, Forum and HHL all propose to locate their nursing homes there. Cypress proposes to locate in Sun City Center and Palm Court is in Plant City, both in Hillsborough County, Southeast, an area ranked fifth in priority in District VI. Plant City is close to Polk County, which the Local Health Plan designates as the fourth ranked area in priority. Cypress proposes its 60-bed nursing home approximately 1/4 mile down the road from an existing nursing home called Sun Terrace, operated by CSI. Quality of care concerns have arisen due to rapid fill-up of 60 additional beds recently licensed at Sun Terrace and opened in September, 1987. See Findings of Fact 83-87, below. As a result, Sun Terrace has imposed on itself a moratorium on new admissions until quality of care concerns can be addressed. In part as a result of the moratorium, Sun Terrace's occupancy rate at the time of the final hearing was only approximately 65 percent, leaving 42 empty beds. MEDICAID NEED. One of the three major considerations for competitive review of nursing home CON applications in the Longterm Care section of the 1985-1987 State Health Plan is "resource access." Except as reflected in the priority rankings, geographic access is not an issue in this proceeding. (Priority/Policy 7 of the Local Health Plan, setting a goal of providing for nursing home services within 30 minutes travel time of 90 percent of urban residents and within 45 minutes travel time of 90 percent of rural residents, already has been achieved in District VI.) But, to address concern for financial access, Priority/Policy 2 of the Local Health Plan provides that applicants "should commit, at a minimum, to serve Medicaid eligible patients in proportion to the representation of elderly poor in the subdistrict." In Hillsborough County, Northwest, where all but two of the applicants propose to locate, the elderly poverty rate is 18.6; in Hillsborough County, Southeast, where Cypress and Pal:n Court would be located, the elderly poverty rate is 15.6 percent. The applicants propose to commit the following percentages of their nursing home beds to the care of Medicaid- 4 eligible patients: HCR, 70 percent; FCP, 70 percent; Manor Care, 30 percent; HHL, 45 percent; Palm Court, 70 percent; and Cypress, approximately 10 percent. Cypress proposed in its application to commit 10 percent of its beds for Medicaid use. It attempted to update its application to provide for a 15 percent Medicaid commitment. The update was said to have been the result of a decrease in the average age of the residents of Sun City Center, Cypress' proposed primary service area, from 73 to 70. But the percentage was calculated by first estimating 60 percent private pay and "backing down" to a Medicare percentage of 25 percent, leaving 15 percent Medicaid. The evidence was persuasive that this attempted update was not due to extrinsic factors. See Conclusions of Law 20 to 25, below. Forum has committed only to have 50 percent of its beds Medicaid- certified and to meet the requirements of Priority/Policy 2. Although Priority/Policy 2 is written as a minimum Medicaid percentage, no evidence was presented from which to determine how high a percentage of Medicaid commitment is desirable. There was, e.g., no evidence on which to find that a Medicaid percentage as high as four times the elderly poverty rate is more desirable than a percentage approximately equal to or perhaps just a bit higher than the elderly poverty rate. To the contrary, the only evidence on the subject was that DHRS does not now consider the Medicaid percentage to be as important as it was considered to be in the past and that DHRS now just checks to see that the percentage approximates the elderly poor rate in the County. NEED FOR ALZHEIMER'S DISEASE PROGRAMS. Description Of The Disease And The Need. There is a need in Hillsborough County for additional nursing home beds and services for Alzheimer's Disease and related disorder victims. There is no known nursing home in Hillsborough County which provides a distinct care unit for Alzheimer's Disease and related disorder victims. There is an estimated unmet need by Alzheimer's patients for nursing home care in Hillsborough County of approximately 1,271 by July, 1989. DHRS has recommended that "preference should be given to applicants for new nursing home beds which propose the development of special Alzheimer's units" and "greater preference should be given to units that will also provide adult day care and/or respite care." Alzheimer's Disease is a brain disorder that was discovered at the turn of the century. It primarily affects persons over the age of 60. The term "related disorders" is used because some non-Alzheimer's disorders mimic Alzheimer's Disease symptoms and create many of the same needs for specialized care. Typically, Alzheimer's Disease results in gradual memory loss and, as memory loss progresses, results in the need for ever- increasing personal care. In the earlier stages, the victim is often in reasonably good physical condition and simply exhibits signs of recent memory loss. However, as memory loss increases, various activities of daily living are disrupted. Victims encounter more serious physical problems and exhibit symptoms such as wandering, significant weight loss, clumsiness, incontinence and antisocial behavior. In the last stages of the disease, the victim requires increasingly intense medical attention, becomes totally dependent on others, and may eventually require total skilled nursing care. The intensity of care required for the Alzheimer's Disease and related disorder victim increases as the disease progresses. In early stages, the victims are typically cared for at home by a family member. The nature of care required for an Alzheimer's Disease or related disorders victim is very exhausting for the care giver. Toward the end of the first stage of the disease when the victim requires increasing supervision, the victim can be maintained longer in the home if there is available to the care giver some form of occasional rest, such as adult day care or respite care. Adult day care and respite care provide opportunities for the primary care giver to "take a break". See Findings of Fact 133 to 135, below. An Alzheimer's Disease patient usually requires inpatient nursing home care late in the second stage of the disease. If the patient is ambulatory, he often exhibits a wandering behavior. Approximately 50 percent of the Alzheimer's victims admitted to a nursing home have the potential to wander. Ultimately, Alzheimer's victims become bed-ridden and require skilled or sub- acute nursing home care, including tube feedings, cathethers, and artificial life support. Historically, ambulatory Alzheimer's patients in nursing homes have been mixed with other patients. The Alzheimer's victim has often disrupted life in the nursing home because of the victim's wandering, incontinence, confusion, and socially unacceptable behavior. Because of these characteristics, some nursing homes avoid admitting Alzheimer's patients and others control problem behavior with sedation and physical restraint. A separate Alzheimer's care unit enables the nursing home to utilize special techniques to manage the Alzheimer's disease victim and allows the victim to maintain his cognitive capabilities for as long as possible, without restraint and sedation. Nursing home patients who do not suffer from Alzheimer's and related diseases are often agitated and disrupted by the Alzheimer's patients' unacceptable social behavior. A separate unit for Alzheimer's Disease victims accommodates the needs of the non-Alzheimer's patient by eliminating unpleasant, often violent encounters between dementia victims and other patients. Distinct Alzheimer's special care units provide better care for Alzheimer's disease and related disorder victims for several reasons. A separate unit eliminates the tendency of the Alzheimer's disease patient to disrupt the remainder of the nursing home. A separate unit provides a smaller, safer, specially designed area with specially trained staff to address the unique needs of the Alzheimer's disease victim. A separate unit is preferable to mixing Alzheimer's patients with non- Alzheimer's patients. Traditional nursing home programs and activities are often inappropriate and counterproductive for the Alzheimer's patient. HCR's Proposal. The 120-bed nursing home proposed by HCR will help meet the needs in Hillsborough County for adult day care, respite care, sub-acute care and a special care unit for Alzheimer's Disease and related disorder victims. The programs and services will enable the HCR nursing home to provide at one location a complete continuum of care from the least intense level of care in adult day care to total (sub-acute) care. HCR's Alzheimer's special care unit will incorporate special design features, special patient activities and programs and higher staffing levels to meet the unique needs cf Alzheimer's disease victims. These features are intended to compensate for memory loss and provide a safe environment where cognitive capabilities can be maintained for as long as possible while patients enjoy personal freedom without the use of restraints and sedation which have typified the treatment of unmanageable Alzheimer's and dementia patients. The architectural design of the HCR nursing home will accommodate the tendency of Alzheimer's victims to wander by allowing the victims to ambulate in circular patterns through the facility and the adjacent court yard and by providing an electronic warning system to prevent inadvertent exit from the nursing home. Patient bathrooms are specially designed to avoid fright and confusion through the use of automatic lighting fixtures, appropriate coloring and distinctly shaped fixtures and waste baskets. Calming colors, color coding, carefully selected art work, special floor coverings and labeling are provided. Separate dining and activities areas enable the nursing home to provide programs and activities for Alzheimer's disease victims in a more effective and efficient manner than would be possible if the same areas also had to be used for non- Alzheimer's Disease victims. The proposed HCR nursing home includes a discreet area designed for an adult day care center, which will share some resources with the nursing home. The program will accommodate 12 persons and be operated in accordance with adult day care regulations. The physical spaces include an entry separate from the main nursing home entry, a lobby, an office, a therapeutic kitchen for use by the patients, toilet facilities, an activities center, and a lounge with an adjacent covered porch. The adult day care program will be staffed by a nurse director, an assistant and volunteers. The participants in this program will be provided with various activities of daily living in an environment developed for Alzheimer's Disease victiMs. This program is intended to provide placement for persons not yet in need of in-patient care and will provide an alternative to premature nursing home admission. Manor Care's Proposal. Manor Care proposes a dedicated 30-bed specialized unit for persons suffering from Alzheimer's disease and related disorders. In 1985, Manor Care perceived the need to treat Alzheimer's patients in a manner different than patients in the general nursing home population. Manor Care's task force of nurses, administrators, architects, and designers developed an Alzheimer's program which recognizes the special needs of the patient. Manor Care now operates 21 special dedicated Alzheimer's units throughout the country and is planning 16 additional Alzheimer's units. Manor Care's comprehensive Alzheimer's program encompasses five components: (1) environment, (2) staffing and training, (3) programming, (4) specialized medical services, and (5) family support. Environment. The proposed 30-bed Alzheimer's unit will be separate from the rest of the facility and self-contained, with its own dining room, activities room, lounge, quiet/privacy room, nurses sub-station, director's office, and outdoor courtyard. A separate dining room for Alzheimer's residents enables staff to provide individualized attention and special assistance. By providing a simple and separate dining environment, residents are no longer embarrassed by confusion and agitation displayed in the presence of non-Alzheimer's residents during mealtime. A separate lounge area is provided for families to visit with residents. In a typical nursing center, the family must visit a confused resident in the presence of other families; families of Alzheimer's residents can find this embarrassing. A separate lounge makes visitation more desirable for Alzheimer's residents and families. The quiet/privacy room can be used by families as a quiet area to visit with a family member, by residents who want to spend time alone, or by staff persons and residents for individualized programming away from the activity on the unit. The outdoor courtyard, which is enclosed and accessible to the unit through the activities room and hallway door, allows Alzheimer's residents to walk outside freely without wandering off. The Manor Care Alzheimer's unit is specially designed with features which reduce environmental stress by minimizing glare (using parabolic lenses), noise and bold patterns which increase agitation in Alzheimer's residents. Throughout the unit, a residential, uncluttered atmosphere is emphasized, using soft, contrasting colors and textures. The unit also contains visual cues to increase orientation. Furnishings are functional, durable and easy to maintain. Staffing and Training. The Alzheimer's unit has its own specialized staff including a Unit Director, Activities Director, and nursing staff. The unit is staffed at a higher "nurse to resident" ratio than the rest of the facility. Staffing patterns emphasizu continuity to ensure that residents receive individualized care. The nurses become f;i1iar with the behavior and abilities of each resident and are able to render care appropriately. Programming. The goal of programming and activities in the Alzheimer's unit is to improve the quality of life of the Alzheimer's resident. This specialized programming results in reducing the use of medications and restraints necessary to manage the Alzheimer's resident. The Manor Care Alzheimer's activity program is success-oriented; staff provide activities designed to allow Alzheimer's residents to succeed more frequently. (They usually fail when mixed in with the general nursing home population.) specialized Medical Services. The use of consultant medical specialists is an integral part of Manor Care's Alzheimer's Program. Specialists provide diagnostic and treatment services for Alzheimer's residents upon admission to the unit, and thereafter when deemed medically appropriate. Family support. Family support is another important aspect of the Manor Care Alzheimer's program. Families are very supportive of the unit's programming and have benef itted from the understanding and support available to them. The Others' Proposals. None of the other applicants propose specialized units for the care of patients with Alzheimer's disease and related disorders. Alzheimer's sufferers will be treated in an "open unit" at the HHL facility and will be placed as compatibly as possible with other residents. Although these residents will be able to intermingle with other residents, their movements will be monitored by the "wander guard" system and all doors will be equipped with buzzers connected to the nurse's stations. The HHL facility will be designed to incorporate secure courtyards and other areas where residents will be free to wander safely throughout the living areas. The facility's nursing personnel will be specially trained to provide services to Alzheimer's sufferers. The proposed HHL facility will also offer an adult Alzheimer's day care program. Although the program will be small (accommodating between four to six individuals) it will interface with the Alzheimer's program offered to the in-house residents. As with the respite program, the Alzheimer's adult day care program will give the families of Alzheimer's disease sufferers an opportunity to take a breather during the day, and the participants will benefit from the special Alzheimer's programs and activities offered. With its proposed 60-bed addition, Palm Court plans to add a program directed specifically at persons suffering from Alzheimers and related brain disorders. Currently, it does not have one. Neither FCP nor Forum make any particular provision for the care of Alzheimer's patients. FCP points out that its facilities in other states historically have cared for this special category of patient, primarily through use of high quality, thereapy-oriented programs, especially at the earlier stages of the disease. Cypress proposes to locate off of a central core: a 60-bed nursing home, offering both intermediate and skilled care, with its own recreation area and dining, serviced from the central kitchen; (2) a 20-bed assisted living unit (which Cypress also calls "supportive care") for mentally frail and physically strong individuals which has its own outdoor recreation area and dining area; and (3) another 40 assisted living beds broken into two 20-unit wings for mentally strong and physically frail individuals, with their own dining and recreation area, including outdoor recreation. The various levels of care are separate since each of the levels have different needs and methods of treatment. However, Cypress will only accept in the mentally frail, physically strong wing, Alzheimer's-type patients who are in the earlier stages of the disease. QUALITY OF CARE. Priority/Policy 9 of the 1985 Local Health Plan states: "Applicants should be evaluated as to their achievement of superior quality ratings by DHRS and other indications of quality as available." Track Record. At the time of application, three of the nursing homes operated by HCR in Florida had superior licenses and the remaining homes had standard licenses. FCP has one nursing home in Florida. It is rated standard by DHRS. None of the facilities operated by FCP's principals, the Phillipses, has ever been in receivership or had a Medicaid or Medicare certification revoked. The Phillipses have an excellent reputation in Ohio for their operation and management of nursing homes and have remained in positive standing with federal and state certification agencies. Manor Care's proposed 60-bed addition will be owned by Manor Care of Florida, Inc., a wholly-owned subsidiary of Manor HealthCare Corporation. Manor HealthCare Corporation is a publicly-held corporation which owns and operates about 130 nursing homes in various states. Manor Care owns and operates nine nursing homes and three adult congregate living facilities (ACLFs) in Florida. All nine Florida nursing homes exceed DHRS licensure standards; the majority of Manor Care's Florida facilities hold a superior license rating. Manor Care has never had a license denied, revoked, or suspended in Florida. Manor Care has opened three nursing homes in Florida in recent years. All three are superior rated. Palm Court Nursing Home has a superior license, with zero deficiencies, from DHRS' Office of Licensure and Certification with the most recent inspection having occurred between May 2 and May 4 immediately preceding the beginning of the final hearing. It is managed by National Health Corp., Murpheesboro, Tennessee. National Health Corp is an owner-operator of other facilities and either owns or operates some 19 facilities in Florida. It has managed Palm Court Nursing Home since its inception and, if the 60 bed addition is approved, will manage the addition. Forum has never had a license denied, revoked or suspended, nor had a facility placed in receivership. Forum has never had any nursing home placed in receivership at any time during its ownership, management or leasing. Forum has a history of providing quality of care and owns and operates facilities in other states which hold superior ratings. Forum has a corporate policy of seeking to attain a superior rating in those states which have such a system. Forum presently owns and operates one facility in Florida. That facility is rated standard and was acquired by Forum within the past two years. That facility, which only has 35 nursing beds, is not a prototype of what Forum proposes in this case. Seventeen (17) of the twenty-one (21) nursing homes currently managed by CSI are located in states which utilize a superior rating system. Of the facilities that are eligible to receive superior licenses, CSI maintains superior ratings in over 80 percent of its beds. CSI's Sun Terrace in Sun City Center was the subject of an extensive survey issued by the Office of Licensure and Certification, an arm of DHRS, in April, 1988, that cited numerous deficiencies in the areas of quality of care, staffing, and programs at the Sun Terrace facility. The licensure survey also cited violations of state and federal laws in the handling of controlled substances and problems with resident care plans at the facility. The findings of DHRS in its licensure survey of Sun Terrace appear to be serious matters, the resolution of which is clearly within the control of CSI. Following the opening of the second 60 beds at Sun Terrace in September, 1987, the facility experienced a shortage of nursing personnel which necessitated a greater use of agency personnel to staff the facility. The problems cited by DHRS at Sun Terrace were largely the result of the increased use of agency personnel, lack of documentation, a newly licensed administrator, and the unexpected resignation of the director of nursing. Even before the DHRS licensure survey, CSI had taken affirmative action to address the problems at Sun Terrace, including a voluntary moratorium on new admissions. In response to the recent problems at Sun Terrac, CSI has moved toward more centralized management of its facilities. CSI now requires administrators to adhere very closely to the corporate policies and procedures. Further, the addition of a second full-time nurse/consultant will double the frequency of quality of care monitoring visits at CSI facilities. The problems experienced at Sun Terrace are atypical of CSI-managed facilities. When CSI's policies and procedures are properly followed, the result is excellent nursing care and services. But the problems at Sun Terrace are examples of what can happen when an organization attempts to expand operations more rapidly than it should. In this connection, CSI has received seven CONs since July 1984. Two of the seven are preliminary approvals that have been challenged and have not yet gone to hearing. One was the 60-bed addition to Sun Terrace which is now licensed. Another is a 73-bed nursing home in Brevard County which is expected to open within the next several months, and another is a 21-bed addition project in Collier County. Cypress has never operated a nursing home and has no track record. Staffing. Staffing arrangments are important considerations in assessing the quality of care to be expected from a proposal, but there is not necessarily a proportional correlation between staffing and quality. How staffing affects quality also depends on the breadth and types of programs to be offered. For example, Alzheimer's programs and sub-acute care will require higher staffing ratios. HCR, FCP, Manor Care, Palm Court and Forum all propose staffing arrangments that meet or exceed state requirements. See Findings Of Fact 1-5, above. Cypress' application, on the other hand, leaves much to be desired in its proposed staffing. The staffing plan presented by Cypress on its Updated Table 11 fails to meet the requirements of Rule 10D-29, F.A.C. Specifically, no provision has been made for an activity director (10D-29.116), a medical director (10D-29.107), a pharmacy consultant (10D-29.112), or a medical records consultant (10D-29.118), all of which are required by rule. (Cypress attempted to explain that it would have a pharmacy consultant on contract who would bill patients separately.) Further, no provision has been made for utilization review to monitor the appropriateness of the placement of residents, as required by Rule 10D-29. Cypress' Updated Table 11 provides for LPNs of 1.5 FTEs on the first shift and night shift and 6.0 FTEs on the second shift. The second shift LPN coverage is over-staffed by 4 1/2 FTEs which will result in inefficiency. Rule 10D-29.108, F.A.C., requires staffing of nursing assistants on all shifts. The Cypress staffing plan makes no provision for nursing assistants on the second shift. In testimony, Cypress attempted to explain that Table 11 was wrong and that the second shift LPNs should have been aides. The proposes Cypress nursing home will not offer 24-hour RN coverage. The third shift has no RN coverage. Based upon the proposed staffing pattern appearing in Cypress' Updated Table 11, its proposed facililty would not qualify for licensure under Florida regulations, much less qualify for a superior rating. Cypress has not secured or identified the day-to-day management of the proposed nursing home. No medical director has been secured or identified. Quality Assurance programs. All of the applicants except Cypress have existing quality assurance (QA) programs that are adequate to assL're quality of care. From the evidence HCR's, Manor Care's, HHL's and Forum's QA programs are comparable and are the best among the applicants. Palm Court has had results comparable to or better than the others , which is itself evidence of an adequate QA program. Meanwhile, CSI, despite an evidently superior QA program, has experienced quality programs due to rapid fill-up of its 60 additiional beds at Sun Terrace. Cypress has no experience operating a nursing home. Not surprisingly, it professes to desire quality and to plan to implement stringent QA programs. But its plans at this stage are not as developed and detailed as the existing QA programs being used by the other applicants at other facilities. Other Factors. Whether Therapies Are In-House or Contracted. Assuming a need for it, and reasonable cost of providing it, provision of therapies--e.g., physical therapy, occupational therapy and speech therapy-- in-house generally is preferable to providing them by contracts with third parties. From an operational and administrative perspective, there are advantages to providing physical therapy services (PT) on an in- house basis. Contracted physical therapy staff tend to be available only for scheduled treatments; in-house staff are always available to assist staff and perform unscheduled maintenance therapy. In-house physical therapy staff work regularly with the nursing home staff. They are present within the facility anc learn the operation of the nursing home facility better than outside agencies. Manor Care proposes to provide in-house physical therapy staff, as opposed to employing outside physical therapy staff on a contract basis. The evidence was that the other applicants plan to provide all of these therapies through third- party contracts. Palm Court has one full-time PT assistant who works under the direction of a licensed physical therapist who now divides time among three 120- bed nursing homes managed by National Health Corp. The service of this licensed physical therapist is provided as part of National Health Corp's management services. Having to cover another 60 beds at Palm Court will spread the service even thinner. In addition, Palm Court's administrator conceded that the single PT assistant in Palm Court's application will not be enough once 60-beds are added to the facility; two will be required. Of course, the trade-off (implied in Finding of Fact 102, above) for providing in-house therapy is that it is less efficient if full use of the services is not required. De-institutionalization. FCP, Forum and Cypress have made special efforts to "de- institutionalize" nursing home care at their proposed facilities. All three proposals emphasize the provision of nursing care within aresidential development--a combination of retirement apartments, assisted living accommodations and nursing home. (See also this concept's impact on Continuum of Care concerns, Findings of Fact 114-127, below.) FCP's proposed facility is designed with a residential appearance to facilitate and implement the philosophy of de-institutionalization co:tained in its application. It reflects FCP's modular approach to care with residential units in wings tied to a common area of support services. The support services are extensive. There are activities areas, craft areas, exercise rooms, therapy areas, a beauty salon and barber shop, men's and women's recreational areas, private dining rooms, a community dining room, screened patios and porches, a newsstand, a bank, a post office, a library, a chapel, a screened-in gazebo, and a swimming pool. The exterior amenities of the design include a pond, an exercise course, a sitting deck, and a putting green. The center core and its recreation and therapy programs are designed to encourage interact ion among the residents in all the different levels of care. Although the third floor, where the nursing home is located, also has a secondary lounge and supplemental dining area, the primary dining area, as well as all of the other amenities, are on the first floor to enhance the interaction. The 30-bed size of FCP's proposed nursing home unit is a part of the original Phillips concept of a de- institutionalized setting, enabling the provision of more personalized care. Where there are fewer residents to care for, a better rapport between the residents and the care givers and a more family-type, personal atmosphere are achieved. This 30-bed concept previously has been approved by the Department in Lee and Polk Counties. Those projects are operationally, structurally, and physically identical to this proposed project. The symmetrical, 3-story design minimizes the amount of travel distance for the resident at the farthest unit to the amenities of the center core and its services. The nursing unit is on the third and smallest floor so that the distance by elevator to the central core for the nursing home iesidents is at a minimum'while still providing those residents with the greatest opportunity for quiet time. Privacy is an essential element in achieving high quality of care. The semi-private room plan utilized in this proposal is a unique approach to maximizing privacy for each resident. A permanent partial partition separating the two beds in each room effectively creates two private rooms. This provides a private space for each resident with his or her own thermostat, window, storage space, television, and telephone accommodation, and heightened auditory privacy. There will be equal access to and control of the vestibule and bathroom for each resident. The 585 gross square feet per bed in the FCP proposal is approximately one-third greater than standard nursing home room configuration. Forum's proposal's chief effort in furtherance of the goal of deinstitutiona1izationother than the continuum of care concept and overall residential appearance--is in the relatively large and "up-scale" living areas. The Cypress facility will include a central core dividing the two 60- bed portions of the project. The central core will include an administrative area, a chapel, a beauty and barber shop, enclosed courtyard, physical and occupational therapy, dining, a central kitchen, and a laundry area. One trade-off for de-institutionalization is cost. Both FCP and Forum generally cost more than the others. Cypress claims not to, but its projected construction cost of $49 per square foot is unrealistically low. See Findings of Fact 147 and 149, below. PROGRAMS (OTHER THAN ALZHEIMER'S). Continnum of Care. As just alluded to, several of the proposals emphasize the placement of their nursing home within a larger community of persons needing different levels of care. FCP. FCP proposes the construction of a 30-bed nursing unit as part of a family owned and operated, 120-unit, full continuum of care facility for the elderly. The facility also contains 60 independent living apartments and 30 adult congregate living units. The full continuum of care is proposed in a uniquely designed, de-institutionalized, home-like atmosphere. FCP offers a therapeutic community offering individualized, personalIzed care in small self- contained units, each specializing in various levels of care ranging from day care and respite care, through apartments for the elderly and assisted living, to skilled, post-hospital rehabilitation. The continuum of care will provide a homogeneous environment through which residents can move as their medical and personal needs change. Forum. Forum Group, Inc., is a national company which owns, develops and operates retirement living centers in a number of states. Forum's proposed nursing home will be part of a total retirement living center containing two other levels of care, assisted living (or ACLF units) and independent apartment units. Forum's proposal calls for provision of a continuum of care, from independent living to assisted living to nursing care, all on the same campus. Cypress. Cypress Total Care would be part of an overall medical project known as Cypress Park. The corporation was formed and a master plan was created, to be developed in two phases. Phase I is a 120-bed nursing facility consisting of 60 skilled and intermediate nursing beds, the subject of these proceedings, and 60 personal care units. Phase II would consist of a 290-unit adult congregate living facility (ACLF) and 143 units of independent villa housing on a golf course with nature trails and other amenities. Also proposed in Phase II would be units of medical offices and commercial health-related facilities to support the community. The area selected by Cypress is adjacent to the Sun Hill Medical Arts Building and the Community Arts Building, as well as a hospital owned by Hospital Corporation of America known as Sun City Hospital. These components would be worked into the overall master plan proposed by Cypress. Cypress proposes a multi-level assessment program. The 120-bed Cypress Park Community facility will have an independent level one facility in Sun City Center which will admit healthy elderly residents. These elderly may have canes, but no walkers or wheelchairs, and they will function normally in their activities of daily living. These individuals may prepare two meals a day in their apartments, or have them in the dining room. The main meal will be in the dining room. Social services and activities will be provided and recommended to the independent living residents to enhance their lifestyles. A home health agency is planned as a part of the center so that house calls can be made to insure that any necessary medications are taken and that residents receive the services they might need from time to time. (Cypress has not yet applied for a CON for its home health agency.) The next level of living is for patients who need more assistance. These are residents who require 24-hour companion service. These patients do not require skilled nursing care and do not require the institutional environment of a nursing home. Some of these paients may be in the first stage of Alzheimer's, or they may be physically frail, but not enough to require skilled nursing care. This level is primarily for those individuals who are physically frail and mentally strong or mentally frail and physically strong. The physically frail and mentally strong may have limited ambulatory capabilities, need assistance in activities of daily living, need medication, or need all their meals prepared. As noted above, this level of services also will be provided to individuals who are physically strong but mentally frail. The majority of these people will be Alzheimer's residents, they must be carefully monitored 24 hours a day and receive strong psychological support. The next level of care offered is for individuals who require some nursing care and no longer qualify for the level two care described above. This will be intermediate nursing care and will consist of care from certified nursing aides and licensed practical nurses. These individuals do not require skilled nursing care. Rehabilitation is the key to this portion of the plan, and the rehabilitative center will be involved to constantly push these individuals to the point of rehabilitation where they can reenter an independent lifestyle. If individuals progress further, they can move into the skilled nursing care center in which they will receive care not only from nursing aides and licensed practical nurses, but also from registered nurses. The final level would be acute hospital care which would be provided by the existing Sun City Hospital. The medical staff who are involved in the Cypress project also are on the medical staff of the Sun City Hospital and will be working and consulting with individuals both in the acute hospital care and the nursing home setting to provide appropriate levels of care to the individuals who need it. The nursing home will share IV teams, work with tracheotomy patients, A.D.A. dieticians, accounting services, and other services with the existing hospital in Sun City Center. Palm Court. Palm Court, while currently a free-standing 120- bed nursing home, is located on property where construction of a 360-bed adult congregate living facility (ACLF) is now starting. In addition, Palm Court has transfer agreements with area hospitals including Plant City Hospital, South Florida Baptist Hospital, Brandon Humana Hospital and Lakeland Regional Medical Center. It also has formal working relationships with home health agencies and with elderly programs in the area. The Others. The other applicants--HCR, Manor Care and HHL-- propose free-standing nursing homes. But all can be expected to make efforts to achieve transfer and other agreements with local hospitals, home health agencies and providers of care for the elderly where reasonable and appropriate. Sub-Acute Care. The HCR nursing home will be staffed and equipped to provide sub- acute care. The sub-acute care services provided by HCR will include high tech services such as ventilator care, IV therapy, pulmonary aids, tube feeding, hyperalimentation, and short and long term rehabilitation. HCR currently provides a wide variety of these sub-acute services in its existing nursing homes. CSI currently provides sub-acute nursing services at its existing Florida facilities. Those services include ventilators, hyperalimentation, intravenous therapy, Clinitron beds, heparin pumps, nosogastric and Jejunoscopy tube feedings, subclavian lines, and Hickman catheters. These service will be provided at HHL's proposed facility. Forum will provide skilled and intermediate care, and the following services will be offered at the proposed facility: Sterile dressing changes for decubitus care. Brittle diabetics on sliding scale insulin. Continuous administration of oxygen. Sterile case of tracheotomies. Ventilators. Continuous bladder irrigation. Hyper-alimentation or N-G feeding. IV treatment. Special medication monitoring (e.g. heparin, comadin). New post-operative cases facing hospital discharge as a result of D.R.G. reimbursement. The skilled nursing services to be provided by FCP include parenteral nutrition, internal nutrition, tracheostomy care, respirator care, skin wound decubitus care, ostomy care, and head trauma care. Palm Court also will provide sub-acute care. Adult Day Care Adult day care is a part of the specialized Azfleimer's program HCR proposes. In addition, HHL, FCP and Forum offer adult day care. Respite Care. HCR and Manor Care offer respite care as part of their Alzheimer's programs. Both will have no minimum length of stay and no extra charge over the regular daily rate for nursing home care. All the others except Palm Court also offer respite care, but Cypress' proposal for respite care is sketchy. HHL says it will offer respite care at no extra charge. D. Hospice. Only HCR, Forum and HHL offer hospice care as part of their nursing home programs. F. Rehabilitation and Community Outreach. All of the applicants propose rehabilitative (or restorative) care and some kind of community outreach programs. The distinctions among the ideas expressed by the applicants are not particularly competitively significant. However, the manner in which the therapies are delivered can be significant. See Finding of Facts 102 to 105, above. HOW SOON THE PROJECT BECOMES OPERATIONAL. Because there is a shortage of nursing home beds in Hillsborough County, there is a valid concern how long it would take for the holder of a CON to get its facility operational. Priority/Policy 3 of the 1985 Local Health Plan gives expression to this concern as follows: In competitive reviews, preference should be given to applicants with a documented history of implementing certificates of need within the statutory time frames. Of the applicants who have developed nursing homes in the past (i.e., excluding Cypress), all but Palm Court have a history of timely implementing their CONs. Palm Court had to request an extension of time in implementing its existing 120-bed facility. But Palm Court bought the CON for that project from the original owners in 1982 or 1983. Palm Court then had to secure another, more suitable location, re-design the facility, get construction financing and enter into a construction contract before construction could begin. This delayed the project and resulted in administrative litigation to decide whether Palm Court should lose the CON for failure to timely implement it or be given an extension of time. Palm Court prevailed, and the facility opened in September, 1985. HHL, through CSI, also has a history of timely implementing CONs but recent expansion in Florida raises some question whether it can continue to be as timely in implementing this CON, along with the others. See Findings of Fact 82-87,98, and 100, above. Generally, an addition of beds to an existing nursing home can be constructed more quickly than a new facility, giving Palm Court an advantage in potential speed of implementation. similarly, Manor Care, which is prepared to begin construction on its finally approved 60-bed CON, has an advantage over the others, as well as a potential construction cost savings over Palm Court. See Findings of Fact 146, below. COST OF CARE. Cost of Construction And Development. Advantage of Additions. Within limits placed on recovery of capital costs under the Medicaid and Medicare reimbursement programs now in place (which, to some extent, are emulated by private health care insurers and employers' health benefit plans), construction and development costs generally are reflected in the charges patients pay for nursing home care. Additions, such as Palm Court's and Manor Care's proposals, have a cost advantage over the other proposals. Construction sites already have been prepared, and it is not ncessary to duplicate some features already incorporated in the original structure, such as the kitchen, laundry and building plant. Due to delays in finalization of its approved CON for 60 beds, Manor Care has the fortuitous additional potential cost advantage of being able to construct both the "original facility" and the 60-bed "addition" at the same time. Quality vs. Cost Trade-Off. Other than the cost advantage of adding on, and of saving the contractor's fee by using an in-house construction team (as HCR does), reduced cost of construction generally will reflect reduced quality. For example, some of the quality features incorporated in the proposals of Forum, FCP and Cypress will cost more. See Finding of Fact 113, above. Put another way, lower costs may result in lower patient charges but also may result in lower quality, everything else being equal. The costs of construction of the various proposals may be found in Findings of Fact 1 to 7, above. It should also be noted at this point that Cypress' facility design has features--primarily unusual wall and roof angles and one water heater requiring larger pipe sizing-- which make its construction costs appear lower than they should be. Cost Overruns. The applicants' respective records for cost overruns in implementing CONs mirror their records for timeliness. See Findings of Fact 138-143, above. Cypress has no track record; all the others except Palm Court have experienced no cost overruns; Palm Court's $1.3 million cost overrun was precipitated by the need to secure another site and re-design the facility after it acquired the CON for 120 beds; and CSI, which would be responsible for implementing HHL's proposal, is involved in recent expansion which could affect its ability to bring all of its' CONs on line within budget. Cost of Operations. Economies of Scale--Size of Facility. In addition to construction and development costs, cost of operations are reflected in patient charges. It generally is accepted that a 120-bed nursing home is the optimal size for operational efficiencies. In this respect, the proposals by HCR, Forum and HHL have an advantage over the others. Manor Care has the advantage of proposing to expand a less efficient 60-bed nursing home to an optimally efficient 120-bed facility. To some extent, the generally accepted principle that 120-bed nursing homes are more desirable may have become dated. Two of the proposals--FCP's and Cypress'--combine some of the operating efficiencies of a 120-bed nursing home with the continuum of care and quality of care that can be achieved in a 120-bed living complex that incorporates a smaller nursing unit with other living units of different levels of care. By c(Jmparison, these type facilities are less institutionalized than a 120-bed nursing home, whether free-standing or incorporated within a larger complex with other living units. See Findings of Fact 106 to 113, above. Economies of Scale--Size of Organization. Economies of scale also can be realized from the size of the organization that owns or manages a nursing home. The proposals of all of the applicants except Cypress benefit from this principle, Palm Court to a lesser extent than the others, including in the area of quality assurance, nurse training and nurse recruiting. At the time of hearing, HCR operated nine nursing homes in Florida. HCR has approximately twelve nursing homes scheduled to begin construction in Florida within the next year. Nationwide, HCR operates more than 125 facilities containing approximately 16,000 beds. HCR has designed and built over 200 nursing homes and related health care facilities. HCR realizes substantial savings by using national contracts for the purchase of furniture, equipment, hardware and other operating supplies. Forum, as a national company, has the experience and purchasing power to cut operational costs through national purchase contracts and through economies and improvements experienced at the local level with a total retirement facility all on one campus. The Manor Care Florida Regional Office offers the services of a Regional Director, a Regional Nurse, a Nurse Recruiter, and a Comptroller to work with the corresponding departments of the Manor Care Florida nursing homes. FCP's long term plans are to develop homes in clusters, currently concentrating on the central west coast area of Florida. FCP has previously been granted certificates of need in Lee County and Polk County and has been recommended by the Department for a certificate of need in Hillsborough County. This cluster will operate under a unified local administration and share rehabilitative, medical, social, dietary and transportation personnel, enhancing economies of operation. CSI was formed in 1978 for the purpose of operating extended care facilities, including nursing homes and retirement centers. Since that time, the company has grown to its current operations of twenty-one (21) nursing homes, two (2) retirement centers and one (1) home for the aged located in seven states. Historically, much of this growth has occurred through the acquisition of existing facilities, although more recently the focus has shifted to the development of new facilities. Because CSI has established "national accounts" for the acquisition of movable equipment CSI can purchase nursing home equipment and furnishings and other operating supplies for HHL at reduced prices. (3) Patient Charges. The applicants propose the following room charges for semi-private rooms. Applicant Medicaid Medicare Private Pay HCR 60.94 76.00 75.00 FCP 60.00 65.00 80.00 Manor Care 1/ 69.37 ---- 72.57 HHL 66.30 109.33 2/ 72.76 Forum 67.18 80.67 79.50 Palm Court 77.00 100.00 77.00 Cypress 58.00 65.00 69.00 However, Cypress' charges are suspect; they probably are unrealistically low. Palm Court's charges also are suspect. It is difficult to understand from the evidence whether they are charges or Medicaid reimbursements. It also is difficult to tell if they are current or projected. In any event, they do not relate to the information in Palm Court's pro forma. As previously alluded to, patient charges do not necessarily proportionately reflect construction and development and operating efficiencies. They also are affected by programs and quality. BUILDING DESIGN AND ENERGY FEATURES. Patient Care and Safety. Overall, HCR's design is excellent. Functional elements are effectively inter-related, the building is designed to be open to landscaping, sunlight and court yards, and there is a wide range of amenities. Cypress' patient rooms are smaller than allowed under state requirments. The state minimum in Chapter 10D-29, Florida Administrative Code, is 80 net square feet per bed for multi-bed and 100 net square feet in a single room. Cypress' proposal only has approximately 65.58 gross square feet per bed. Cypress' building design also has rooms that are approximately 130 feet from the nurses' stations and clean utility and soiled utility rooms, 10 feet over the state maximum under Rule 10D-29.121(24), Florida Administrative Code. Forum's :4 floor plan also violates this standard. Rule 10D-29.121(6), Florida Administrative Code, requires a 20 foot clear view out room windows. Cypress' design also violates this standard. Manor Care's floorplan is the most compact one- story design. It has four compact wings off a central core. Forum proposes a two-story structure, creating a potential increased hazard for patients with reduced mobility. But DHRS rules provide for nursing homes of more than one floor, and required safety features, which Forum will provide, keep the potential to an insignificant minimum. FCP proposes a three-story facility with the nursing home on the third floor adjacent to the elevators connecting it to the first floor central core and amenities. FCP, too, adequately addresses DHRS safety concerns and actually could be more convenient to more nursing home patients than a one-story structure. Energy Conservation Features. All of the applicants propose to insulate their facilities for energy efficiency, some, e.q., HHL, somewhat better than others. Building design itself also affects energy consumption. Cypress' high exterior building surface area makes it a less energy-efficient design; Manor Care's compact design aces it a more energy-efficient design. FCP's three-story design also is a more energy-efficient design. Cypress' design incorporates only one water heater. This will produce line loss and lower energy efficiency, as well as potential total loss of hot water. (Cypress also has only one electrical plant.) Other Unique Design Features. Several unique features in FCP's room design helps "de- institutionalize" the facility and contributes to overall quality of care. Similarly, residents at FCP will be able to offer their guests refreshments from the kitchen at any time of the day or nights and children, spouses, and entire families will be encouraged to join residents for meals as often as they wish, assisting in the maintenance of ties with the community. Dining may be either communal or in the several lounge areas and private dining rooms. One of Cypress' unique design features is of the bizarre and morbid variety--a room designed to store deceased residents. FINANCIAL FEASIBILITY. The short-term and long-term feasibility of the proposals of HCR, FCP, Manor Care, Forum and HHL was never seriously questioned and was easily proven. Not so with Palm Court and Cypress. Palm Court. The duty to defend the immediate and long term financial feasibility of Palm Court's project rested with Steve Jones. Mr. Jones, who was not involved in the preparation of the application, offered his opinion that the Palm Court 60-bed addition would be feasible in the immediate and long terms. In giving his opinion of the project's financial feasibility, Mr. Jones stated he believed the pro forma in years 1 and 2 relate back to the corresponding tables in the application; but acknowledged he performed no analysis of his own, but rather he took the information provided him at face value. The pro forma is one of the key components of an application, as literally the heart of the application ties directly or indirectly into developing the pro forma, including Tables 1, 2, 3, 7, 8, 10, 11 and 25, as well as the amortization schedule. It is a required component of the application. Section 381.494(4)(e), F.S. (1985). Mr. Jones was asked to render an opinion on the reasonableness of Tables 8, 10, 11 and 25, which he did. On cross examination, however, Mr. Jones acknowledged he did not evaluate existing staff at Palm Court to determine the reasonableness of the pro forma. He did not verify the projected management fee and, in fact, stated he didn't know if it was included as a line item under "administration and general" on the pro forma nor how the management fee was computed. Mr. Jones, who has never prepared all the financial information in a CON application, also admitted he didn't know what current nursing salaries were in Hillsborough County, or any other salaries for that matter. He further acknowledged that he could not testify that the application's hourly wage times the number of working hours in a year would give you the stated nursing salaries. In sum, Mr. Jones admitted his opinion of the project's feasibility was based solely on his review of Tables 8, 11, 20 and 25 and his firm's involvement in the preparation of Palm Court's two most recent cost reports and not on the pro forma filed with Palm Court's application. Mr. Jones' accounting firm, in preparing Palm Court's cost reports, does not conduct an audit or express any opinion relating to the reasonableness of the statement of revenues and expenses. Joseph Lennartz, an expert in financial feasibility analysis, gave persuasive testimony outlining the inconsistencies in Palm Court's application. Palm Court's total revenue projections appearing in Table 7 for years 1 and 2 do correspond to the daily room and board revenues appearing in the pro forma, yet none of the Table 7 revenue projections correspond to the projected charges on Table 8. Assuming the salaries on Table 11 do not include fringe benefits, all FTE's and salaries on Table 11 are not accounted for in the pro forma. The pro forma salaries are significantly lower than on Table 11: RNs ,- understated by $12,426 LPNs - understated by $30,518 CNAS -understated by $239,541 Social Worker - understated by $2,983 Dietary - understated by $3,009 Maintenance - understated by $10,165 Activities - understated by $4,486 Housekeeping - understated by $6,365 Laundry & Linen - understated by $6,498 Admin & General - understated by $2,560 Palm Court's salary information on Table 11 is in 1987 dollars and needs to be inflated forward at least two to three years. Palm Court's current average salaries exceeded the proposed salaries on Table 11--including the administrator's salary, proposed at an annual salary of just over $31,000 when it actually was over $50,000 in 1987. Based on Palm Court's answers to interrogatories, Palm Court's management fee is not accurately reflected in the pro forma and is $44,559 too low in year 2; the projected dietary expense is understated by $112,386 in year 2; the projected housekeeping expense is understated by $46,609 in year 2; the projected laundry expense is understated by $35,308 in year 2; and plant expenses are understated by $100,116 in year 2. The terms of debt financing appearing on Table 2 of Palm Court's application do not conform to the amortization table, causing the interest expense line item on the pro forma to be understated. Cypress. As previously alluded to, the reasonableness of Cypress' projected Medicaid and Medicare rates appearing on its Updated Table 8 has not been established by competent substantial evidence. The Cypress pro forma fails to make provision for interest expense, depreciation, and property tax expense. These omissions represent an understatement of expenses as follows: YEAR ONE YEAR TWO INTEREST $177,818 $176,186 DEPRECIATION $110,000 $100,000 PROPERTY TAXES 2,200 25,000 (at assessed value 75 percent of market) TOTAL $290,018 $301,186 When interest, depreciation, and property taxes are included in the Cypress pro forma, the result is a loss of $90,000 in year one and $80,000 in year two. Furthermore, from a cash flow perspective, Cypress will incur a cash loss of $2,037 in year one and a cash gain of just $6,342 in year two. If property taxes are based on an assessed value at 100 percent of fair market value, there would be a $2,000 cash loss even in year two. It is not unusual for a nursing home to experience a negative cash flow in its first year of operation due to its low occupancy. However, it is unusual for a nursing home to experience a negative cash flow, as the Cypress facility will, while operating at optimal occupancy (95 percent). Cypress' owner/investors are willing to proceed with the project because they expect to be able to use some of the approximately $90,000 per year tax loss in years one and two to offset personal income, resulting in a cash on cash return of approximately $23,000 or 5.4 percent. Cypress' Table 1, "source of funds" states that the applicant has $425,000 "in hand". In fact, Cypress does not have those funds in hand. They are in the hands of the Cypress owner/investors. So far they have contributed $90,000 to the venture and will have to contribute not only an additional $425,000 to fund the nursing home but also an unspecified larger sum to fund Cypress planned ACLF and other projects. The evidence suggests that at least $425,000 more of equity contribution would be required for the rest of the project. Cypress did not prove that its proposed facility is financially feasible, either in the immediate or long term. BALANCED CONSIDERATION. Giving a balanced consideration to all of the statutory and rule factors addressed in the preceding findings, it is found that there is a net need for 231 community nursing home beds in Hillsborough County, that the applications of HCR, FCP and Manor Care should be granted and that the other applications should be denied.

Recommendation Based on the foregoing Findings Of Fact and Conclusions Of Law, it is recommended that the Department of Health and Rehabilitative Services enter a final order granting the applications of HCR (CON Action No. 5000), FCP (CON Action No. 4993) and Manor Care (CON Action No. 5006) and denying the applications of Forum (CON Action No. 4999), HHL (CON Action No. 4978) Palm Court (CON Action No. 4987) and Cypress (CON Action No. 5004). RECOMMENDED this 14th day of November, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of November, 1988.

Florida Laws (3) 120.57120.68400.071
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer