DEPARTMENT OF ENVIRONMENTAL REGULATION vs. DONALD M. AND MARY LOU STEARNS, 89-001706 (1989)
Division of Administrative Hearings, Florida Number: 89-001706 Latest Update: Feb. 22, 1990

The Issue The issue in Case No. 89-1706 is whether the Stearns violated provisions of Chapter 403, Florida Statutes, in the construction of a dock on the Indian River. The issue in Case No. 89-1707 is whether Mr. Stearns is entitled to a dredge and fill permit for the construction of the above-described dock.

Findings Of Fact The Stearns reside at Sunrise Landing Condominium in Cocoa, Florida. The condominium complex lies on the western shore of the Indian River in north Brevard County. At this location, the Indian River is classified as a Class III water and is conditionally approved by the Department of Natural Resources for shellfish harvesting. By Purchase Agreement dated February 18, 1987, the Stearns agreed to purchase a unit at Sunrise Landings Condominiums from the developer. By subsequent Purchase Agreement Modification, the parties agreed that the Stearns had "permission to build a private boat dock providing buyer obtains all proper permits from the Army Corps of engineers and all other proper authorities." By Warranty Deed dated April 16, 1987, the developer conveyed the unit to the Stearns. The deed, which conveys a 1/72nd interest in the common elements, does not convey any right to build a dock. The deed states that the conveyance is subject to the Declaration of Condominium of Sunrise Landing II. The declaration, which was recorded prior to the deed to the Stearns, defines as Common Element the land lying adjacent and upland to the dock that the Stearns constructed. The declaration states that each unit owner owns an undivided share of the Common Element. Article III, Section 7 states: The Owner of a Unit . . . shall be entitled to use the Common Elements in accordance with the purposes for which they are intended, but no such use shall hinder or encroach upon the lawful rights of Owners of other Units. There shall be a joint use of the Common Elements . . . and a joint mutual easement for that purpose is hereby created. In February, 1987, prior to closing on their unit, the Stearns arranged with an individual named Kurt Ramseyer to construct the dock. Mr. Ramseyer completed construction of the dock on or about July 3, 1987. On or about February 22, 1987, Mr. Stearns executed an application for permit for activities in the waters of the State of Florida. The application warned the applicant that he must obtain all applicable authorizations before commencing work. The application, as well as all others completed by Mr. Stearns, was the joint Department of the Army/Department of Environmental Regulation form, effective November 30, 1982. The application describes the project as a dock consisting of two boat slips measuring 24 feet by 10 feet, a 24 foot by 4 foot pier, and a 12 foot by 12 foot deck. The application identifies as the adjacent property owners the individuals owning condominium units on either side of the Stearns' unit. Mr. Stearns did not complete the affidavit of ownership or control, in which the applicant attests that he is the record owner or, if not, will have "the requisite interest . . .before undertaking the proposed work." The Department of the Army received the application on May 11, 1987. At this time, a copy of the application was forwarded to the Department of Environmental Regulation ("DER") without the required application fee. By letter dated May 18, 1987, DER notified Mr. Ramseyer that the application fee had not been received and, until received, the application had not been officially received. DER received the application fee on May 28, 1987. By letter dated June 25, 1987, DER informed Mr. Stearns, through his designated agent, Mr. Ramseyer, that the proposed project would require a permit under Chapter 403, Florida Statutes, and that his application was incomplete. Among other items requested were descriptions of water depths within a 300-foot radius of the proposed structure, shoreline structures within 100 feet of the proposed dock, and the boats intended to be moored at the facility. By letter dated July 10, 1987, Mr. Stearns provided DER with additional information. Submitting a new application, Mr. Stearns represented this time that the proposed use was private single dwelling, rather than private multi- dwelling, as previously indicated. He also stated that the adjoining landowners were Sunrise Landings Condominium. Again, he failed to complete the affidavit of ownership or control. A partial site plan of the condominium complex shows the dock as five feet north and 45 feet south of the next nearest docks at the complex. As he had on the February 22 application, Mr. Stearns certified as true that he knew that he had to obtain all required authorization prior to commencing construction, although construction had already been completed at this time. In fact, Mr. Stearns indicated on the application, as he did on the October 27 application described below, that construction was "proposed to commence" on June 22, 1987, and was "to be completed" on July 3, 1987. The application explains a four foot increase in the length of the dock as necessitated by "water depth." Elsewhere, the application states that the river had receded four inches since March, 1987. In justifying the construction of the dock in two sections, Mr. Stearns explained that the "shallow depth of the water . . . could result in possible environmental damage to the river bottom, if power boats were allowed to be moored in close proximatity [sic] to the area of the bulkhead line." Mr. Stearns described the boats that he proposed to moor at the dock. At maximum capacity, one boat has a draft of 10 inches, and the other has a draft of 14 inches. Attached to the application is a diagram showing maximum/minimum water depths. The depths are 13"/9" at the bulkhead, 19"/15" at 10', 21"/17" at 20', 23"/19" at 30 `, 25"/21" at 40', and 26"/22" at 50'. Mr. Stearns explained: In order to minimumize [sic] the possible environmental damage to the river bottom aquatic growth, it was necessary to place the power boat mooring section of the dock a minimum of 20 feet away from the bulkhead line. Another diagram shows water depths of 22" to 26" from 50 feet to 300 feet from the bulkhead to the north and south of the dock. 15. By letter dated June 17, 1987, which Mr. Stearns attached to the July 10 application, the Department of the Army issued him a general permit for the proposed project. The letter warns that "it appears that a permit from the Florida Department of Environmental Regulation may be required." The attached diagram shows a structure with a total length of 36 feet. By letter dated July 30, 1987, DER informed Mr. Stearns that, among other things, the affidavit of ownership or control was incomplete; discrepancies existed between the original application and the most recent application, such as with respect to the names of different adjoining landowners and different proposed uses from private multi-dwelling to private single dwelling; it was unclear whether all permits were received prior to dock construction; and it was unclear what portion of the deed entitled the applicant to place the dock in its proposed location. By letter dated October 27, 1987, Mr. Stearns provided DER with additional information and submitted a partial new application. He attested to the fact that he was the record owner of the property, although he failed to provide the required legal description. As to the question involving different adjoining property owners, Mr. Stearns indicated that he believed that because the dock was located more than 25 feet from the nearest living unit, the approval of other property owners was not required. He explained that the private single dwelling unit was a condominium unit in an eight-unit building. He advised that construction of the dock was completed on July 3, 1987. As to water depths, he showed a depth of 9 inches at the bulkhead and 26 inches at 500 feet. Additionally, he showed mean low water of 12 inches at 10 feet, 16 inches at 20 feet, 23 inches at 30 feet, and 26 inches at 40 feet. By letter dated December 8, 1987, DER informed Mr. Stearns that his application was deemed complete as of October 29, 1987. By Intent to Deny dated January 8, 1988, DER notified Mr. Stearns of its intent to deny his application for a permit. The notice states that the project is not exempt from permitting procedures. The notice acknowledges the presence of about 40 piers installed at the condominium complex without the appropriate permits. The notice states that water depths within visual distance of the shoreline are relatively shallow with scattered marine grass/algae clumps in the vicinity due to the shallow water. In this regard, the notice concludes: Installation of a pier in such shallow water, less than 24 inches deep, for permanent mooring of a small watercraft will probably cause localized disturbance of the benthic community by prop wash. This situation is already evident at several of the nonpermitted piers. Additionally, the Notice of Intent raised the issue of ownership or control. Citing an earlier final order, the notice states that "`the Department will not knowingly issue a permit for dredging and filling or other activities which would constitute a trespass on private property."' By Petition for Administrative Hearing filed January 19, 1988, Mr. Stearns requested an administrative hearing on the Intent to Deny his application for a permit. By letter dated January 27, 1988, assistant general counsel for DER confirmed a recent telephone conversation with Mr. Stearns and stated that, pursuant to that conversation I will hold your petition pending further action by the Department towards resolution of the situation. If it appears that an amicable resolution cannot be reached, I will forward the petition to the Division of Administrative Hearings for the assignment of a hearing officer. By Notice of Violation and Orders for Corrective Action dated December 19, 1988, DER notified Mr. and Mrs. Stearns and 101 other persons owning or having owned units at Sunrise Landing Condominiums that an investigation of the property on June 2, 1987, had disclosed that 43 docks had been installed and placed less than 65 feet apart with 75 boat slips. These docks had been constructed without permits. A meeting with unit owners on March 15, 1988, had not produced a resolution of the dispute. The Notice of Violation alleges that the docks extended up to 20 feet waterward of the bulkhead through water depths of 8-24 inches. The docks allegedly were constructed within an area conditionally approved by the Department of Natural Resources for shellfish harvesting, but without a Department variance. The docks allegedly resulted in damage to state waters and pollution through localized disturbance of the benthic community by associated boat traffic prop wash in shallow water. The adversely impacted submerged bottom allegedly is highly productive with scattered seagrasses providing valuable fishery resources for the Indian River. Lastly, DER alleges that it had incurred investigatory expenses of at least $1500. After reciting the statutes allegedly violated by the construction of the docks, the Notice of Violation demands, among other things, the removal of all of the docks. By Petition for Formal Proceeding filed January 12, 1989, Mr. and Mrs. Stearns requested a formal administrative hearing on the Notice of Violation. Pursuant to notice, DER held an informal conference with numerous owners of docks, including Mr. and Mrs. Stearns, on February 9, 1989. At the conclusion of the meeting, DER agreed to hold open the informal conference period for an additional 30 days to allow settlement negotiations to be concluded. By Amended Notice of Violation and Orders for Corrective Action dated March 23, 1989, DER issued another notice of violation against the ten remaining dock owners, including Mr. and Mrs. Stearns, who had not yet removed or agreed to remove their docks. The allegations are substantially identical to those of the original Notice of Violation. Because of the failure of settlement negotiations, DER transmitted both files involving the Stearns to the Division of Administrative Hearings on March 31, 1989. In several prior cases, DER had previously informed other unit owners seeking to build a dock off of the bulkhead adjoining the Common Element that no permit was required because the project was exempt under Section 403.813(2)(b), Florida Statutes. In March or April, 1987, DER changed its position on this point. The docks 45 feet north and 5 feet south of the Stearns' dock were constructed without a dredge and fill permit, apparently in reliance upon the same exemption to which the Stearns claim to be entitled in the subject cases. The operation of boats in the vicinity of the dock constructed by Mr. and Mrs. Stearns would stir up the submerged bottom and result in prop dredging of critical vegetation. In sum, the intended use of the dock would disrupt the benthic community. At times, the Stearns have been unable to reach their dock with their boats due to the shallowness of the water. The waters of the Indian River surrounding the Stearns' dock are Class III waters that the Department of Natural Resources has conditionally approved for shellfish harvesting. The Department of Natural Resources has not granted the Stearns a variance for the construction of the dock. The dock is less than 500 square feet of total coverage. The moorings from the dock five feet to the south of the subject dock remained in place following the removal of the remainder of the structure. At the time of the application, the Stearns dock, whose construction had begun no later than June 22, 1987, and been completed on July 3, 1987, was 45 feet south of the nearest dock to the north and 5 feet north of the nearest dock to the south. Both of these docks had been built under claims of exemption. The Stearns dock was maintained for the exclusive use of the Stearns and was not available to other unit owners. DER has failed to prove any investigatory expenses directly attributable to the Stearns, as opposed to the 103 unit owners in general. Moreover, given the pending applications, which disclosed most of the specifics of the subject dock, including inadequate water depths, no portion of the investigation could properly be attributed to the Stearns, especially when the sole witness for DER could not testify to any specific damage to submerged bottom and vegetation caused by boats using the Stearns' dock. Additionally, actual damage and the investigatory expenses attributable thereto are divisible and could have been attributed to a particular violator, but were not.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Regulation enter a Final Order denying the subject permit and ordering Mr. and Mrs. Stearns to remove their dock, upon such conditions as are necessary to avoid damage to the environment, but not imposing any administrative fine. ENTERED this 22nd day of February, 1990, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of February, 1990. APPENDIX Treatment Accorded Proposed Findings of DER 1-11: adopted or adopted in substance. 12: adopted as to general shallowness and excessive shallowness with respect to the passage of boats. 13-15: adopted or adopted in substance. 16: rejected as irrelevant. 17-24: adopted. 25: rejected as recitation of testimony, unsupported by the greater weight of the evidence, and irrelevant. Treatment Accorded Proposed Findings of the Stearns 1-3: adopted or adopted in substance, except that last sentence of Paragraph 3 is rejected as subordinate. 4: adopted. 5: rejected as unsupported by the greater weight of the evidence. Placing a dock in water too shallow for safe boating may arguably constitute a navigational hazard. 6: adopted. 7: rejected as unsupported by the greater weight of the evidence. In the first place, the facts at the time of the application should control whether the project was, at the time of its actual construction, exempt from the permitting requirements. In addition, the evidence showed that the pilings of at least the closer dock remained in the water following the removal of the decking. 8: first two sentences adopted. Second sentence rejected as unsupported by the greater weight of the evidence. 9: [omitted.] 10: rejected as unsupported by the greater weight of the evidence. It is clear from the operative documents--namely, the warranty deed and declaration of condominium--that Mr. and Mrs. Stearns lack the legal right to use the Common Element in the manner that they have used it. A clause in an unrecorded contract, which probably does not survive closing, cannot diminish the rights of other Unit Owners in their undivided shares of the Common Element, which, in part, the Stearns have seized for their private use. 11: first paragraph adopted. Second paragraph rejected as irrelevant and unsupported by the greater weight of the evidence. COPIES FURNISHED: Dale H. Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Steven A. Medina Assistant General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Frank J Griffith, Jr. Cianfronga, Telfer & Reda 815 South Washington Avenue Titusville, FL 32780

Florida Laws (8) 120.57403.031403.087403.0876403.121403.141403.161403.813
# 1
MICHAEL L. GUTTMANN vs ADR OF PENSACOLA AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 00-002524 (2000)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Jun. 16, 2000 Number: 00-002524 Latest Update: Mar. 18, 2002

The Issue The issue is whether ADR of Pensacola should be issued a wetland resource permit and sovereign submerged lands authorization allowing the construction of a 30-slip docking facility on Big Lagoon, Escambia County, Florida.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this environmental permitting dispute, Petitioner, Michael L. Guttmann, who lives less than one mile from the project site, has challenged the proposed issuance by Respondent, Department of Environmental Protection (Department), of a Wetland Resource Permit (permit) and Sovereign Submerged Lands Authorization (authorization) which would allow Respondent, ADR of Pensacola (applicant), to construct a 30-slip docking facility on Big Lagoon, Escambia County, Florida. The facility will be part of a condominium project to be constructed on the upland portion of the property. As grounds for contesting the permit, Petitioner contended that the Department failed to consider "the long term health of Big Lagoon," navigational hazards created by the project, or public safety; failed to impose an adequate "monitoring program"; did not provide for a "contingency plan for hurricane activity"; failed to consider that the activity will degrade a nearby Outstanding Florida Water [OFW]; and failed to take into account "existing unused marina slips close by." The petition further alleged that the foregoing concerns constituted violations of Section 373.414, Florida Statutes (2000), and Rules 62-4.242, 62-302.300, 62-302.700, and 62- 312.080, Florida Administrative Code. The cited statute identifies "additional criteria" for issuing a permit while the first three rules pertain to OFWs. The last rule contains general standards for the issuance or denial of a permit. Petitioner raised no issues concerning the issuance of the authorization in his initial pleading. Until April 2000, the upland property was owned by the applicant. It was then sold to Harbour Pointe of Pensacola, Inc., which has subsequently entered into an agreement with the applicant allowing the applicant to construct the dock, operate the permit, and purchase a condominium unit. If the application is approved, applicant intends to construct a 442 feet x 4 feet access pier with seventeen 30 feet x 1.5 feet finger piers, thirteen 40 feet x 1.5 feet finger piers, and a 74 feet x 1.5 feet terminal platform, to form a 30-slip docking facility at 10901 Gulf Beach Highway on Big Lagoon, a Class III water in Escambia County, Florida. Approval to use the submerged lands is found in the authorization. The dock will be located in a "fairly pristine area" in Big Lagoon a few miles southwest of Pensacola, Florida. That body of water is six miles in length and is separated from the Gulf of Mexico by a slender coastal barrier island known as Perdido Key, which lies approximately one statute mile south of the project. Continuing west along the shoreline next to the project site are a string of single-family homes with small dock facilities, most of which are less than 1,000 square feet in size and thus exempt from Department permitting requirements. To the east of the undeveloped property are more undeveloped lots and a private yacht club with extensive docking facilities. The facility being challenged here will not be a public marina; rather, it will serve the residents of a proposed upland condominium (consisting of two buildings) to be constructed at the same location. The project is more commonly referred to as the Harbour Pointe Marina. It is fair to infer that Petitioner and adjoining property owners object not only to the dock, but also to the condominium project. The application and project When the application was originally filed with the Department in July 1995, it contained plans for a longer dock and more slips. Due to a reduction in the length of the pier and number of slips to conform to Department rules, other technical changes, and various requests by the Department for additional information, the draft permit was not issued by the Department until May 2000. The Department considers this a "major project" with "major [hydrographic and water quality] issues connected with it." In reviewing the application, the Department considered whether reasonable assurance had been given by the applicant that water quality standards would not be violated, and whether the additional criteria in Section 373.414(1)(a)1.-7., Florida Statutes (2000), had been satisfied. The Department concluded that water quality standards would not be degraded, and that the project, as designed and permitted, was not contrary to the public interest. In making the public interest determination, the Department typically assigns a plus, minus, or neutral score to each of the seven statutory factors. In this case, a neutral score was given to historical and archaeological resources [paragraph 373.414(1)(a)6.] since there were none, while the permanent nature of the project [paragraph 373.414(1)(a)5.] caused it to be rated "a little bit on the minus side"; all other factors were given a plus. Department witness Athnos then concluded that on balance the project "was a plus because it will not adversely affect any of these things." The access pier (dock) runs perpendicular from the shoreline and stretches out some 442 feet to where the water reaches a depth of seventeen feet, which is the deepest point in Big Lagoon. The unusual length of the dock is required so that the boat slips will begin past the seagrass colony (which lies closer to the shore), to prevent boat propeller blades from cutting the top of the seagrass, and to reduce the amount of sedimentation stirred up by the boat propellers. Aerial photographs confirm that when completed, the dock will probably be the largest in Big Lagoon, and much larger than the neighboring docks to the west. The use of boat slips will be limited to condominium owners. Only 19 slips will be constructed initially, since the applicant has secured approval at this time for only the first phase of the condominium project. When approval for the second phase is secured, the applicant intends to add an additional 11 slips. Water quality In his initial pleading, Petitioner made a general allegation that the Department failed to consider "the long term health of Big Lagoon"; there were no specific allegations regarding water quality standards. In his Proposed Recommended Order, however, he argues that the [a]pplicant failed to provide reasonable assurances that water quality standards would not be violated." Assuming arguendo that the issue has been properly raised, Petitioner has still failed to substantiate his allegation. That portion of Big Lagoon where the project will be located is a Class III water of the State. Studies on metals, greases, oils, and the like submitted by the applicant reflected that the "water quality [in that area] did not exceed the standards in Rule 62-302." To provide further reasonable assurance regarding water quality standards, the applicant has voluntarily agreed to use concrete piling and aluminum docks. Unlike wooden piling and docks, these types of materials do not leach toxic substances such as arsenic, copper, and acromiom into the water. In addition, special permit conditions require that sewage pumpout equipment be located at the site so that boats will not discharge raw sewage into the waters. Liveaboards are prohibited, and fueling will not be available at the facility. Finally, the cleaning of fish is not allowed, and boat owners cannot scrape their boat bottoms while docked at the facility. All of these conditions are designed to ensure that water quality standards will not be violated. Enforcement mechanisms for the above conditions are found in either the permit itself or Chapter 403, Florida Statutes. Also, one of the conditions in the draft permit expressly states that the applicant is not relieved of liability for harm or injury to humans, plants, or property caused by the construction of the dock. However, if a permit is issued, Condition 9 of the permit should be modified to require that trained personnel be available twenty-four hours per day, rather than just during standard business hours, to assist boaters with, and ensure that they use, the sewage pumpout equipment. Any permit issued should also require that boats be placed on lifts while using the docking facilities. This will prevent any leaching of paint from the boat bottoms into the waters. Otherwise, the paint would cause a degradation of the water. The more persuasive evidence supports a finding that, with the additional conditions, reasonable assurance has been given that the state water quality standards applicable to Class III waters will not be violated. Outstanding Florida Waters In his complaint, Petitioner has contended that "the proposed activity will degrade an [OFW] as a result of its close proximity to the Gulf Islands National Seashore," and that the"[D]epartment has made no analysis of this project['s] impact on the [OFW] which is adjacent to the proposed activity." The record discloses that the southern portion of Big Lagoon has been designated as an OFW. This area includes the waters around Gulf Islands National Seashore and Big Lagoon State Park; they begin approximately 650 to 700 feet south of the end of the dock. As noted earlier, the project is located within Class III waters. Because the Department found that no violation of state water quality standards in those waters would occur, it likewise concluded, properly in this case, that the project would have no impact on any OFW, even though such waters begin some 650 or 700 feet away. Under these circumstances, there would be no reason to assess the water quality in the OFWs or the projected impacts on those waters, as Petitioner suggests. In the absence of any credible evidence to the contrary, it is found that the project will not adversely impact an OFW. Hydrographic characteristics If a dock has more than ten boat slips, the Department routinely conducts a hydrographic (flushing) study to determine whether the structure will adversely affect the flow of the water in the area or cause erosion or shoaling on adjacent properties. In the summer of 1999, a Department engineer conducted a hydrographic study using a dye tracer and concluded that flushing characteristics were excellent and that there would be no adverse effects caused by the project. This conclusion has not been credibly contradicted. Therefore, it is found that the dock will not adversely affect the flow of water or cause harmful erosion or shoaling. Navigational issues In his initial pleading, Petitioner raised a contention that the project will create "navigational hazards" because the dock "extends nearly into a navigation channel which routinely carries commercial towboats transporting hazardous material, the spill of which would adversely affect Big Lagoon." He also alleges that the rupture of a vessel could impact public safety. Channel markers placed by the U.S. Army Corps of Engineers in the Intracoastal Waterway (of which Big Lagoon is a part) define a navigational channel for boats approximately 400- 500 feet south of the end of the proposed dock. That channel is used by both recreational and commercial traffic, including barges and other large watercraft which regularly haul oil, chemicals, and other products through the Intracoastal Waterway to and from Pensacola, Panama City, and St. Marks, Florida. The water in the marked channel is only thirteen feet deep. Because the U.S. Army Corps of Engineers has jurisdiction over the maintenance of the marked channel, the Department defers to that entity's judgment in determining whether a proposed structure will impede navigation in the marked channel. The proposed dock ends near the deepest part of the natural channel where the water reaches a depth of seventeen feet. Because of the deeper water to the north, which allows the boat captain to "get better steerage," the commercial boat traffic sometimes tends to follow the natural channel, rather than the marked channel formed by the navigational aids. When they do so, however, they are straying from the so-called "legal" channel. Petitioner's expert, a retired tugboat captain, opined that in a storm or squall, a commercial boat using the natural rather than the marked navigational channel might be blown extremely close to the dock or even strike it, thus causing a hazardous situation. He acknowledged, however, that he was not predicting more accidents because of the construction of the dock; he also admitted that the dock would not cause ships to "sudden[ly] have problems navigating that Big Lagoon." The location of the proposed dock was shown to the U.S. Army Corps of Engineers and the Florida Marine Patrol, and there were no adverse comments regarding this issue by either agency. In the absence of any negative comments by those agencies, and the acknowledgement by Petitioner's own witness that the dock will not cause accidents or create navigational problems for other boaters, the more persuasive evidence supports a finding that the project will not adversely affect navigation or public safety in Big Lagoon. Seagrass and monitoring Petitioner has alleged that Big Lagoon "is the healthiest body of water in Escambia County with a white sand bottom and abundant seagrass," and that the proposed project will adversely affect its "long term health." He also alleges that the Department has failed to provide a "remedy or punishment should the results [of the Department's monitoring plan] indicate that the seagrass has been harmed"; that the Department's monitoring plan is not "of sufficient duration to reasonably report the long-term effect of concentrated mooring and traffic" or "sufficiently specific to insure usable data"; and that the data relied upon by the Department [such as photographs] were not "sufficient" to determine the existing health of the seagrass. The evidence reflects that a "nice, healthy seagrass community" is found in the area where the dock will be constructed. It stretches out several hundred feet from the shoreline to where the water reaches a depth of around six feet. The Department considers seagrass to be a "most important resource" which should be protected. This is because seagrass is essential for "binding" the shoreline and stabilizing the sediments, and it serves as a nursery area for juvenile fish and shellfish. Indeed, due to these beneficial effects, far more species of shellfish are found in areas where seagrass thrives than in areas where no seagrass exists. To protect the seagrass, the dock has been extended out 442 feet from the shoreline so that the first boat slip begins at a depth of seven feet, or just past where the seagrass ends. This will prevent the scarring of the grass by boat propellers and reduce turbidity that is typically caused by propeller dredging and boat wakes. Thus, at least theoretically, no boat activity by condominium owners is contemplated in waters of less than seven feet. Because seagrass requires as much light as possible to survive, educational signs will be posted in the area to warn boaters that seagrass is found closer to the shoreline, and that mooring in that area is prohibited. There is, however, no enforcement mechanism to ensure that condominium owners or nonresidents comply with these warnings. Under the draft permit, the Department is allowed to access the premises at reasonable times for sampling or monitoring purposes. A special section of the draft permit includes a number of requirements pertaining to the monitoring of turbidity levels during dock construction while another section requires the applicant to take photographs of the existing seagrass beds at numerous locations before, during, and after construction of the dock. Condition 14 requires that the permittee maintain "records of monitoring information" for at least three years. The evidence supports a finding that if a permit is issued, a mapping of the seagrass should be made prior to construction of the dock and during the height of the growing season (September and October). When the photographing of the area is performed, the applicant should use a sampling protocol that is based on a scientifically determined method. Also, both affected and unaffected areas should be monitored to compare the effect of the additional boat traffic on the seagrass after the dock is constructed. All of these conditions should be incorporated into any issued permit. According to Dr. Heck, a marine biologist who specializes in the study of seagrass and testified as an expert on behalf of Petitioner, seagrass beds in Big Lagoon have been "shallowing up" or thinning out in recent years due to decreasing water clarity. In other words, as the water becomes cloudier from more and more boat activity, the sunlight cannot penetrate and the seagrass will not thrive. The seagrasses most susceptible to disappearing are those that are found at the deepest depth. Doctor Heck attributed the decline in seagrass to increased human activity in the area. This activity is related not only to the existing homeowners in the area, but also to the non-resident boaters (both recreational and commercial) who use the waters in that area. A Department study conducted in 1995 confirmed that the only seagrass area in North Florida "significantly affected" by propeller scarring was an area in Big Lagoon known as Scallop Cove, near Spanish Point. This study is consistent with those studies performed by Dr. Heck in the late 1990's, and one as recently as last year, that support a finding that seagrass in Big Lagoon is on the decline due to both propeller scarring and increased turbidity caused by wakes from larger recreational boats. For this reason, Dr. Heck concluded that the addition of thirty boats at the project site, some of which would be as large as 30 feet or so, would have a "negative effect" on the seagrass colony. This in turn will cause a negative effect on the marine productivity in the area, as well as the conservation of fish and their habitat. Doctor Heck's testimony on this issue is found to be the most persuasive. Other concerns Petitioner further contends that the Department failed to provide a "meaningful contingency plan for hurricane activity." This matter, however, is beyond the permitting jurisdiction of the Department. Petitioner has also contended that the Department failed to take into account "existing unused marina slips close by" which could be used by the condominium owners. Like the prior issue, this matter is not a consideration in the permitting scheme. Another issue raised by Petitioner, albeit untimely, was that the construction of this dock could lead to further development in Big Lagoon. There was, however, no evidentiary support for this contention. Indeed, there is no evidence that future permit applications with impacts similar to this application can reasonably be expected in the area. At hearing, Petitioner raised for the first time a contention that the applicant no longer owns the upland property and thus a permit/authorization cannot be issued to that entity. Aside from this issue being untimely, the fact that a permit holder does not own the upland property is not unusual. If this occurs, permits and authorizations (leases) are routinely transferred to the new owner once the Department receives the necessary title information. It is not a ground to defeat the application. Petitioner also raised for the first time at hearing a contention that the site plan approval for the condominium has expired under a provision of the Escambia County Land Development Code and therefore the permit should be denied. Again, the issue is untimely; more importantly, it should be addressed in another forum since the Department has no jurisdiction over this issue. Likewise, a legitimate concern by an adjoining property owner, witness Hobgood, and an area realtor, that Hobgood's single-family property would probably decline in value if the project is built is nonetheless beyond the Department's jurisdiction. Finally, a contention that the Department improperly calculated the maximum number of boat slips for an 88-unit condominium project has been rejected. The record contains a lengthy explanation by witness Athnos which shows that the Department's calculation under Rule 18-21.004(4)1., Florida Administrative Code, was correct. Those calculations are also detailed in Respondents' Exhibit 14.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying the application of ADR of Pensacola for a wetland resource permit and sovereign submerged lands authorization. DONE AND ENTERED this 28th day of February, 2001, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (850) 488-9675, SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of February, 2001. COPIES FURNISHED: Kathy C. Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Michael L. Guttmann, Esquire 314 South Baylen Street, Suite 201 Pensacola, Florida 32501-5949 Charles T. Collette, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 David A. Sapp, Esquire 1017 North 12th Avenue Pensacola, Florida 32501-3306 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (5) 120.569120.57253.77267.061373.414 Florida Administrative Code (6) 18-21.00428-106.20562-302.70062-312.06562-312.08062-4.242
# 2
MRS. A. K. DOYLE vs. B. W. PEAKE, MILDRED N. PEAKE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-000127 (1983)
Division of Administrative Hearings, Florida Number: 83-000127 Latest Update: Jun. 11, 1984

The Issue This case concerns the issue of whether the Respondents, B. W. and Mildred Peake, should he granted a permit to construct an addition to an existing dock located on the north shore of Old River in Pensacola, Florida. The Petitioner, Mrs. A. K. Doyle, testified on her own behalf and also called as a witness, Mildred N. Peake, one of the applicants. The Petitioner offered no exhibits into evidence. Mr. B. W. Peake testified on behalf of himself and his wife Mildred N. Peake. The Peakes offered and had admitted into evidence Exhibits 1-7. The Department of Environmental Regulation called as witnesses Mark Snowden and Richard Fancher. The Department offered and had admitted Exhibits 1-6. Subsequent to the final hearing, Counsel for the Petitioner and the two Respondents submitted proposed findings of fact and conclusions of law for consideration by the Hearing Officer. To the extent that those proposed findings and conclusions are inconsistent with this order, they were rejected as not being supported by the evidence or as unnecessary to the resolution of this cause.

Findings Of Fact The Respondents, B. W. and Mildred N. Peake, have filed an application for a permit to construct an addition to an existing private pier located on the north shore of Old River, adjacent to Innerarity Point. It will be centered on a lot located at 878 Innerarity Road, Pensacola, Florida. B. W. and Mildred N. Peake are the owners of the property where the existing dock is located. On December 23, 1982, the Department of Environmental Regulation by letter notified the applicants that the Department intended to grant the permit application. The Petitioner, Mrs. A. K. Doyle, filed an objection to the issuance of that permit. Mrs. Doyle's property is adjacent to the eastern boundary of the Peake property. The application, as modified, seeks to extend the existing pier by sixteen (16) feet. The existing pier is five feet wide and approximately 185 feet long. The addition is to be constructed of the same materials used in the existing pier and will rest on treated pine pilings. The purpose of the pier is to allow temporary berthing for two additional sailboats. There will be no fuel pumps or toilets on the pier. The pier will be used for private purposes only and will involve no commercial operation. Upon completion of the addition, the Peake's pier would be approximately 110 feet from the Intercoastal Waterway Channel and will not create a hazard to navigation. The Peakes have obtained approval from the U.S. Army Corps of Engineers to construct the pier extension. They have not obtained consent from the Department of Natural Resources to use the state owned lands beneath the proposed addition. The addition to the pier will total approximately 80 square feet and will require 4 pilings. There is currently an extensive grass bed consisting of Cuban Shoalweed approximately 90 feet from the shoreline. Jetting of pilings for the addition will occur approximately 103 feet from the closest point of this grass bed. The proposed addition will have no significant impact on the existing grass beds. The grassbeds in this area stop growing at the edge of the photic zone or that point at which sunlight can no longer penetrate the water. At this site, this occurs at a depth of 1.5 meters or approximately 4.8 feet. The depth of the water at the site of the proposed addition is from 8 to 10 feet. There are no grasses growing in the immediate area of the project site. The grass beds in the area contain a wide diversity of benthic microinvertebrates. The number of species and density of benthic microinvertebrates were less at the addition site. The proposed addition will not interfere with marine life or destroy marine productivity. The substrate at the immediate project site consists of coarse sand with some fines associated with the sand. During the piling installation, these fines will become suspended in the water, thus creating turbidity. The use of a turbidity screen or control device during construction would limit turbidity to the project site with very temporary, limited violation of water quality. The project will have no deleterious effect on water quality. All boats using the pier will have Coast Guard approved marina heads. These marine heads will not discharge into the waters in the area. Garbage from the boats will be disposed of at the Peake home adjacent to the pier. The pier is presently being used to permanently moor one sailboat.

Recommendation Based upon the foregoing findings of fact and conclusions of law it is, RECOMMENDED: That the Department of Environmental Regulation issue a permit for the applicants, B. W. and Mildred N. Peake, to construct an addition to their existing dock in accordance with the application as modified. The permit should contain all the specific conditions included in the Department's letter of intent dated December 23, 1982. In addition, the necessary approval from the Department of Natural Resources should first be obtained. DONE AND ORDERED this day of April 1984, in Tallahassee, Florida. MARVIN E. CHAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 27th day of April 1984. COPIES FURNISHED: Victoria Tschinkel Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 E. Gary Early, Esquire Division of Administrative Hearings Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Ralph A. Peterson, Esquire Post Office Box 12950 Pensacola, Florida 32576 James M. Wilson, Esquire Post Office Drawer 1832 Pensacola, Florida 32598

Florida Laws (2) 403.087403.088
# 3
DONALD FLYNN AND BEVERLY FLYNN vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-004737 (1996)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Oct. 07, 1996 Number: 96-004737 Latest Update: Mar. 09, 1998

Findings Of Fact Based upon the evidence adduced at the evidentiary hearing on the Department's Motion, and the record as a whole, the following Findings of Fact are made: In October of 1995, Petitioners, who desired to construct a single-family, concrete dock in the Hillsboro Canal (in Broward County, Florida) for their 171-foot yacht and to perform dredging adjacent to the dock (Project), filed with the Department a Joint Application for Environmental Resource Permit/Authorization to Use State Owned Submerged Lands/Federal Dredge and Fill Permit (Application). In the Application, Petitioners indicated that their mailing address was: c/o Flynn Enterprises 676 N. Michigan Ave., Suite 4000 Chicago, IL 60611 Flynn Enterprises, Inc., is a business owned by Petitioner Donald Flynn. The Application listed "Jeff Adair, Project Manager" of "Keith and Schnars, P.A., 6500 N. Andrews Avenue, Ft. Lauderdale, FL 33309," as the "agent authorized to secure permit" for Petitioners. The application form that Petitioners used to submit their Application contained the following signature page: By signing this application form, I am applying, or I am applying on behalf of the applicant, for the permit and any proprietary authorizations identified above, according to the supporting data and other incidental information filed with this application. I am familiar with the information contained in this application and represent that such information is true, complete and accurate. I understand this is an application and not a permit, and that work prior to approval is a violation. I understand that this application and any permit issued or proprietary authorization issued pursuant thereto, does not relieve me of any obligation for obtaining any other required federal, state, water management district or local permit prior to commencement of construction. I agree, or I agree on behalf of my corporation, to operate and maintain the permitted system unless the permitting agency authorizes transfer of the permit to a responsible operation entity. I understand that knowingly making any false statement or representation in this application is a violation of Section 373.430, F.S. and 18 U.S.C. Section 1001. Typed/Printed Name of Applicant (if no Agent is used) or Agent (if one is so authorized below) Signature of Applicant/Agent Date (Corporate Title if applicable) AN AGENT MAY SIGN ABOVE ONLY IF THE APPLICANT COMPLETES THE FOLLOWING: I hereby designate and authorize the agent listed above to act on my behalf, or on behalf of my corporation, as the agent in the processing of this application for the permit and/or proprietary authorization indicated above; and to furnish, on request, supple- mental information in support of the appli- cation. In addition, I authorize the above- listed agent to bind me, or my corporation, to perform any requirement which may be necessary to procure the permit or authorization indicated above. I understand that knowingly making any false statement or representation in this application is a violation of Section 373.430. F.S. and 18 U.S.C. Section 1001. Typed/Printed Name of Applicant Signature of Applicant Date (Corporate Title if applicable) Please note: The applicant's original signature (not a copy) is required above. PERSON AUTHORIZING ACCESS TO THE PROPERTY MUST COMPLETE THE FOLLOWING: I either own the property described in this application or I have legal authority to allow access to the property, and I consent, after receiving prior notification, to any site visit on the property by agents or personnel from the Department of Environ- mental Protection, the Water Management District and the U.S. Army Corps of Engineers necessary for the review and inspection of the proposed project specified in this application. I authorize these agents or personnel to enter the property as many times as may be necessary to make such review and inspection. Further , I agree to provide entry to the project site for such agents or personnel to monitor permitted work if a permit is granted. Typed/Printed Name Signature Date (Corporate Title if applicable) The name "Jeff Adair" appears on the "Name of Applicant (if no Agent is used) or Agent (if one is so authorized below)" line under the first paragraph on the signature page of Petitioners' Application; however, neither Adair's signature, nor any other signature, appears on the signature line under this paragraph. Petitioner Donald Flynn's signature appears on the signature lines under the second (agent designation and authorization) and third (access to property) paragraphs on the page. By letter dated November 17, 1995, the Department informed Petitioners of the following: Preliminary evaluation of your project leads staff to the conclusion that the project as proposed cannot be recommended for approval. While this is not final agency action or notice of intent, it does represent the staff review of your application based on consider- able experience in permitting matters. We are sending you this letter at this stage of the processing to allow you to assess fully the further commitment of financial resources for design dependent on permit issuance. . . . In summary, please revise plans to: (1) reduce the amount of dredging; (2) reduce impacts to natural resources; (3) reduce the size of the dock; (4) reduce encroachment on navigational channel; (5) reduce encroachment on adjacent properties; and (6) after minimization, offer mitigation plans that would address the loss of seagrass in the vicinity (watershed or basin) of the project site. Your application is currently "incomplete" and Final Agency Action will not occur until a reasonable amount of time is allowed for the submittal of a revised plan. A completeness summary has been sent under separate cover, addressing the items that are still outstanding. Staff will continue to process your application in the normal manner; however, I suggest you contact Tim Rach of this office . . . to discuss these possible alternatives regarding your project. The Department's November 17, 1995, letter was addressed to Petitioners "c/o Jeff Adair, Project Manager, Keith and Schnars, P.A., 6500 North Andrews Avenue, Fort Lauderdale, FL 33309-2132," as were subsequent requests for additional information made by the Department and other correspondence from the Department concerning the Project. Adair responded to the Department's requests for additional information and otherwise corresponded and communicated with the Department on behalf of Petitioners. In July of 1996, Adair participated in a telephone conference call during which the Department advised him that, if the Application was not withdrawn, it would be denied. On August 13, 1996, Adair sent the following letter to the Department concerning the Project: Pursuant to our recent discussions pertaining to the proposed mitigation plan and final review and processing of the Flynn Dock application, we have been advised via Mr. Flynn's attorney not to withdraw the application. Therefore, we await the Department's final decision relative to the permittability of this project. As you have indicated, we are anticipating the Depart- ment's response toward the end of this month. In making your decision, we strongly urge you to consider the merits or our innovative and "no risk" mitigation plan. We believe our mitigation plan more than compensates for proposed impacts and provides substantial net benefits to the environment and the research community. In particular, information obtained from our proposed research effort would not only benefit our project, but would also facilitate scientific analysis and review of similar applications and issues. As always, please do not hesitate to call should you have any questions or concerns. On August 19, 1996, the Department sent the following letter to Petitioners "c/o Flynn Enterprises, 676 N. Michigan Ave., Suite 4000, Chicago, IL 60611," the address that Petitioners had indicated in the Application was their mailing address: We have reviewed the information received on May 31, 1996 for an Environmental Resource Permit and authorization to use sovereign submerged lands. The Department has deemed the application complete as of this date. Final action on your application for an Environmental Resource Permit and sovereign[] submerged lands authorization will be taken within 90 days of receipt of your last item of information unless you choose to waive this timeclock. If you have any questions, please contact me at . . . . A copy of this August 19, 1996, letter was sent by the Department to Adair. On August 27, 1996, the Department issued a Consolidated Notice of Denial (Notice) in which it announced its preliminary decision to deny Petitioners' Application. The Notice contained the following advisement: A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding (Hearing) in accordance with Section 120.57, Florida Statutes. Petitions filed by the permittee and the parties listed below must be filed within 14 days of receipt of this letter. Third party Petitioners shall mail a copy of the petition to the permittee at the address indicated above at the time of filing. Failure to file a petition within this time period shall constitute a waiver of any right such person may have to request an administrative determination (hearing) under Section 120.57, F.S. The Petition must contain the information set forth below and must be filed (received) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000: The name, address, and telephone number of each petitioner, the permittee's name and address, the Department Permit File Number and county in which the project is proposed; A statement of how and when each petitioner received notice of the Depart- ment's action or proposed action; A statement of how each petitioner's substantial interests are affected by the Department's action or proposed action; A statement of the material facts disputed by petitioner, if any; A statement of facts which petitioner contends warrant reversal or modification of the Department's action or proposed action; A statement of which rules or statutes petitioner contends warrant reversal or modification of the Department's action or proposed action; and A statement of the relief sought by petitioner, stating precisely the action petitioner wants the Department to take with respect to the Department's action or proposed action. If a petition is filed, the administrative hearing process will constitute a renewed determination of the Department's decision on the application. Accordingly, the Department's final action may be different from the position taken by it in this letter. Persons whose substantial interests will be affected by any decision of the Department with regard to the permit have the right to petition to become a party to the proceeding. The petition must conform to the requirements specified above and be filed (received) within 14 days of receipt of this notice in the Office of General Counsel at the above address of the Department. Failure to petition within the allowed time frame constitutes a waiver of any right such person has to request a hearing under Section 120.57, F.S., and to participate as a party to this proceeding. Any subsequent intervention will only be at the approval of the presiding officer upon motion filed pursuant to Rule 28-5.207, and 60Q-2.010, F.A.C. This Notice constitutes final agency action unless a petition is filed in accordance with the above paragraphs or unless a request for extension of time in which to file a petition is filed within the time specified for filing a petition and conforms to Rule 62-103.070, F.A.C. Upon timely filing of a petition or a request for an extension of time this Notice will not be effective until further Order of the Department. . . . The Notice was mailed (by certified mail, return receipt requested) to Petitioners "c/o Flynn Enterprises, 676 N. Michigan Ave., Suite 4000, Chicago, IL 60611." Although the Notice's certificate of service reflected that a copy of the Notice had been mailed to Adair "before the close of business on AUG 27 1996," in fact, as a result of inadvertence on the part of Department staff, a copy of the Notice had not been mailed to Adair. On September 3, 1996, the Notice sent to Petitioners was received by a Flynn Enterprises, Inc., employee at the address to which it was mailed. The employee executed a return receipt upon receiving the Notice. The Notice was referred to Victor Casini, Esquire, the general counsel of Flynn Enterprises, Inc., on September 4, 1996. Casini set the document aside for filing. He did not believe that there was any immediate action that he or anyone else in the Flynn Enterprises, Inc., office in Chicago needed to take in response to the Notice. Casini noted that Adair's name was listed in the Notice as among those who purportedly had been furnished copies of the Notice. He knew that Adair was handling all matters relating to the permitting of the Project for Petitioners. He therefore assumed that any action that needed to be taken in response to the Notice would be taken by Adair on behalf of Petitioners. Inasmuch as it appeared (from his review of the Notice) that the Department had already furnished Adair with a copy of the Notice, he saw no reason to contact Adair to apprise him of the issuance of the Notice. In taking no action in response to the Notice other than setting it aside for filing, Casini acted reasonably under the circumstances. Adair first learned of the issuance of the Notice during a telephone conversation he had on September 9, 1996, with an employee of Broward County, who mentioned to him, in passing, that the Department had denied Petitioners' Application. 2/ Adair thereupon immediately telephoned the Department to confirm that the Application had been denied. The Department representative to whom he spoke confirmed that the Notice had issued, apologized for the Department's failure to have sent him a copy of the Notice, and promised to rectify the error by sending him a copy of the Notice as soon as possible. Keith Skibicki, the vice president of Flynn Enterprises, Inc., in charge of its day-to-day operations, served as the liaison between Adair and Petitioners. On September 12, 1996, Adair telephoned Skibicki to inquire (for the first time) if Petitioners had received a copy of the Notice. Skibicki, who previously had neither seen nor heard about the Notice, asked around the office and learned that the Notice had been received and was in Casini's files. Skibicki related this information to Adair. Later that same day, September 12, 1996, Adair received the copy of the Notice that the Department had sent him. He then faxed a copy of the Notice to Harry Stewart, Esquire, the Florida attorney who had been retained by Petitioners to assist them in their efforts to obtain favorable action on their Application. Shortly thereafter Adair telephoned Stewart to discuss what they should do in response to the Notice. During their conversation, Stewart expressed the opinion that the 14-day period for filing a petition for an administrative proceeding began to run only upon Adair's receipt of the Notice and that therefore Petitioners had until September 26, 1996, to file their petition. During the two-week period that followed their telephone conversation, Adair and Stewart worked together to prepare such a petition. The petition was filed with the Department on September 26, 1996 (which was 23 days after the Notice had been delivered to the Chicago office of Flynn Enterprises, Inc., but only 14 days after Adair, Petitioners' designated agent in their dealings with the Department, had received a copy of the Notice). The actions taken on behalf of Petitioners in response to the Notice were intended to preserve Petitioners' right to challenge the proposed denial of their Application. At no time was there any knowing and intentional relinquishment of that right.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department enter an order finding that Petitioners' petition challenging the proposed denial of their Application is not time-barred and remanding the matter to the Division of Administrative Hearings for a Section 120.57(1) hearing on the merits of Petitioners' challenge. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 6th day of February, 1997. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 6th day of February, 1997.

USC (1) 18 U.S.C 1001 Florida Laws (16) 120.569120.57120.595253.002253.03267.061373.114373.403373.4136373.414373.421373.427373.4275373.430380.06403.031 Florida Administrative Code (5) 18-21.00218-21.00318-21.00418-21.005162-343.075
# 4
PELICAN ISLAND AUDUBON SOCIETY, DR. RICHARD BAKER, AND DR. DAVID COX vs INDIAN RIVER COUNTY AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 13-003601 (2013)
Division of Administrative Hearings, Florida Filed:Vero Beach, Florida Sep. 16, 2013 Number: 13-003601 Latest Update: Aug. 27, 2014

The Issue The issues are (1) whether the St. Johns River Water Management District (District) should approve the application of Indian River County (County) for an environmental resource permit (ERP) authorizing the construction and operation of a surface water management system with stormwater treatment for the Oslo Road Boat Ramp Parking Lot; and (2) whether the District should approve the County's request for a variance from Florida Administrative Code Rule 40C-4.302(1)(c) and sections 10.1.1(c), 12.1.1(d), and 12.2.5(c) of the Applicant's Handbook: Management and Storage of Surface Waters (AH) in order to perform other related work.

Findings Of Fact The Parties The Pelican Island Audubon Society is a Florida non- profit corporation whose mission is to preserve and protect the animals, plants, and natural communities in the County through advocacy, education, and public awareness. It has more than 25 members that live in the County and has been a chapter of the Audubon Society of Florida since 1964. Dr. Richard Baker resides in the County and engages in water-based recreational activities such as canoeing, bird watching, nature photography, and fishing in the Lagoon near the boat ramp. Dr. David Cox resides in the County and engages in water-based activities such as kayaking and nature observation in the vicinity of the boat ramp. The County is the applicant for an ERP and variance for a project known as the Oslo Road Boat Ramp project. The District is the agency charged with the responsibility of regulating water resources within its geographic boundaries and to administer and enforce chapter 373, Florida Statutes, and the rules promulgated under title 40C. The Existing Oslo Road, Boat Ramp, and Lagoon Oslo Road is a County-owned road that runs in an east- west direction and intersects with U.S. Highway 1 just south of State Road 60. To the east of U.S. Highway 1, the road is paved for a short distance; the remaining portion of the road (2,460 feet) is a narrow, two-lane dirt road that dead-ends at the boat ramp. Most of the dirt road is bordered to the north and south by a mangrove swamp that extends to the edges of the road. All wetlands have been previously disturbed. The surrounding and abutting jurisdictional wetlands consist primarily of both tidal (north side) and impounded/partially tidal mangrove swamp (south side), which was created years ago by a mosquito control district in order to reduce the salt marsh mosquito population. The boat ramp is bordered to the north by a clump of red mangroves and a sparsely vegetated sandy shoreline and to the south by a dense mangrove fringe. During rain events, the dirt and sediment can wash off the road as erosion. This requires the County to continually maintain the dirt road by grading and adding marl material to bring it back up to grade. The boat ramp has been in existence for more than 50 years and is the nearest public access to the popular South County fishing areas in the Lagoon. Although there are 17 other boat ramps in the County, the closest one is six miles to the north in the City of Vero Beach. The typical users of the boat ramp are fishermen with shallow-draft boats, while the open shoreline to the north is normally used to launch canoes and kayaks and to access the river by wading fishermen. There are a number of water-based communities in the area, including one directly to the east of the boat ramp. Many boats that do not launch at the boat ramp use the nearby seagrass beds as a fishing destination. The boat ramp has a dirt cul-de-sac, a concrete boat ramp with finger piers, and is surrounded by the Lagoon, the receiving water body for the project and classified as Class III waters. In December 2007, the Department of Environmental Protection (DEP) verified that the Lagoon is an Impaired Water Body of the State, with the impairment being for nutrients in the vicinity of the project. Currently, there are no designated parking areas associated with the boat ramp. Vehicles both with and without trailers park in the cul-de-sac and along the roadside. The only limit to the extent of parking along Oslo Road is the distance somebody is willing to walk. During peak times, the dirt road and cul-de-sac become congested and blocked with cars, trucks, and boat trailers. In 1977, the County obtained a permit from the United States Army Corps of Engineers (USACE) to construct the boat ramp with two appurtenant piers and a riprap groin. During the subsequent years, there was substantial deterioration to the ramp, bulkhead, and docks. Accordingly, in 2009, using an exemption under rule 40C-4.051(12)(i), the County replaced the concrete portion of the boat ramp within the same footprint and constructed two accessory docks that now define the width of the one-lane boat ramp. During this process, the County removed around 25 cubic yards of muck from the base of the boat ramp. The boat ramp is only 16 feet wide and 40 feet in length and is located in water less than three feet below Mean Low Water (MLW). In contrast, a typical boat ramp in the County is around 76 feet, or twice as long as the Oslo Road boat ramp. The existing boat ramp was designed to be used by motorized vessels. There is a separate launch area for kayak and canoes next to the concrete ramp. The motorized vessels that currently use the boat ramp are small with a draft less than 18 inches. This is partly due to the presence of cap rock beyond the proposed dredging area, which limits the draft size of the boats, and the small size of the single-lane ramp. The only signage at the ramp advises the public that this is a shallow draft vessel launch and that the limits of the draft are 18 inches. The channel leading out of the boat ramp was previously dredged around 1950. During that era, only shallow draft boats would launch at Oslo Road. In February 1977, the United States Fish and Wildlife Service confirmed that an old channel about 75 feet long and 15 feet wide existed at the boat ramp location. In May 1977, additional maintenance dredging of the old silted channel to a depth of -3.00 Mean Sea Level (MSL) was authorized by the USACE. Although the parties disagree over whether any dredging was ever performed, surveys, aerial photographs, and research suggest that more than likely the project site was dredged in the late 1970s or early 1980s. A portion of the area that the County proposes to dredge falls within the area that was previously permitted by the USACE in 1977. The distance from the boat ramp to the Intracoastal Waterway (ICW) is approximately one-half mile. The channel is delineated by a number of poly vinyl chloride pipes and six sets of permitted navigational channel markers leading to the ICW. The water depths in the area surrounding the boat ramp, including the channel to the ICW, are very shallow. Drainage from the road currently runs down the ramp causing sand and other material to build up in the ramp area. Due primarily to this drainage, at low tide the water at the boat ramp area has been so shallow that boaters have experienced great difficulty when loading; in some cases, launching or retrieving a vessel is almost impossible. After a rain event, turbidity plumes in the Lagoon have been observed extending 100 feet to the north of Oslo Road, 150 feet to the south, and approximately 30 feet to the east. The seagrass beds adjacent to the boat ramp were described as lush, healthy, and productive. The proposed dredging area contains less than 1.5 percent of seagrass coverage. There is no evidence that the current use of the boat ramp causes prop scarring to the surrounding seagrass. The Lagoon in the vicinity of the boat ramp has been determined to be a high manatee use area, as defined by the County Manatee Protection Plan (MPP). However, this area is not a high watercraft-related manatee mortality area. Since 2002, the waterway in the vicinity of the project site has been regulated by seasonal manatee protection speed zones. Signs have been posted since 2003. The shoreline to the ICW is currently regulated at slow speed between November 1 and April 30 and is unregulated the remainder of the year. The County intends, however, to adopt a new ordinance that makes the slow speed zone effective the entire year, rather than just during the winter months. The Project and Variance In late 2009, the County submitted to the District its ERP application. Since that time, the County has modified its plans seven times and amended the application twice. Notably, the modifications reduce the direct impacts to wetlands from 2.98 acres to 1.41 acres for the improvement of the dirt road and parking lot; they also reduce impacts to ditches that support fisheries habitat and submerged lands. They will result in 0.113 acres of combined direct impacts to seagrass and Lagoon substrate from the proposed dredging. The project will not change the hydroperiod of the surrounding wetlands. The number of trailer parking spaces was reduced from 32 to 12 and the parking space angle changed. A dry retention area on the west side of the project will be installed; a wet detention pond was eliminated; the dock extension reduced; and at Petitioners' request, the project was shifted north to avoid impacting a ditch to the south. The County eliminated and reduced impacts to surface waters by reducing the width of the proposed dredge area so as to not impact seagrass beds to the north and south of the channel. Dredging is limited to a depth of -2.5 feet MLW and will be within the same area that was dredged in the 1950s. It is not expected to contribute to larger vessels launching at the boat ramp. The latest iteration of the project consists of paving the 2,460 feet of dirt road to a width of 26 feet, constructing a surface water management system, and constructing a parking area to accommodate 12 vehicles with boat trailers and 11 vehicles without a trailer. No changes to the size or configuration of the concrete boat ramp will be made. The project will extend the northern accessory dock of the existing one-lane boat ramp by approximately 32 feet to allow more boats to tie off; dredge 4,943 square feet (0.113 acres) of the ingress/egress access way within the Lagoon to a depth of -2.5 MLW; install an additional three sets of channel markers (six in total); install "No Parking" signs to limit vehicle parking to the designated parking area; and install additional signage to warn boaters of the shallow depths in the area and to notify boaters that to launch at this boat ramp, vessel drafts must not exceed 18 inches. The proposed surface water management system consists of roadside conveyance swales, pipes, weirs, and two dry retention areas which will provide water quality treatment for stormwater runoff from basins upstream of the project area and the existing paved portion of Oslo Road. The two proposed dry retention areas will provide water quality treatment in accordance with the design and performance criteria in the District's rules. Currently, these areas drain into existing swales and then east into the Lagoon with no water quality treatment. The system will result in a net improvement to water quality based on a nutrient loading analysis review by the District. The County is proposing off-site mitigation to offset the direct and secondary impacts. It consists of 18 acres of enhancement at Earman Island within the Lost Tree Islands Conservation Area, including 14 acres of wetland enhancement. Earman Island is part of the chain of islands in the Lagoon just north of State Road 60 known as Lost Tree Islands purchased by the County for conservation purposes. The proposed enhancement area is building upon an existing mitigation area on the north end of the island. The proposed mitigation is within the same drainage basin as the area of wetlands and other surface waters to be adversely affected. There are no cumulative impacts associated with the project. The County owns all of the property that will be dredged, filled, or paved, including the submerged lands waterward of the Mean High Water (MHW) line at the boat ramp out approximately 215 feet. This area is not within an Aquatic Preserve or Outstanding Florida Waters, and none of the dredging will occur on sovereign submerged lands. See Jt. Pre-hearing Stip., p. 13, ¶¶ 18-20. In summary, the purpose of the project is seven-fold: provide water quality treatment for the runoff water; limit the number of parking spaces available for users of the boat ramp; decrease the need for the County to maintain the 2,460 feet of dirt road; create a safe place for boaters to moor while waiting to retrieve their boats from the Lagoon; allow boaters to safely launch and retrieve their boats from the Lagoon at low tide; create a clear channel for boaters to get from the base of the boat ramp to the ICW; and decrease turbidity in and around the mouth of the boat ramp. The portion of the project that expands the accessory dock and dredges the channel will be located in Class III waters classified by DEP as restricted for shellfish harvesting. Rule 40C-4.302(1)(c) places additional requirements on regulated activities that are proposed in Class III waters restricted for shellfish harvesting. These requirements are set forth in the AH. Without a variance from the rule and AH, the District would be required to deny the ERP. Therefore, the County must qualify for and obtain a variance from rule 40C- 4.302(1)(c) and AH sections 10.1.1(c), 12.1.1(d), and 12.2.5(c). Petitioners' Concerns The essence of Petitioners' objections is that once Oslo Road and the parking lot are paved, and the channel dredged, the boat ramp will attract a tremendous number of fishermen from throughout the area who will use larger and deeper draft boats to access the Lagoon. Petitioners contend that more and larger boats, along with the proposed activities, will result in the environmental impacts described in their Amended Petition. The conditions for issuance of an ERP are set forth in rules 40C-4.301 and 40C-4.302. The standards and criteria in the AH are used to determine whether an applicant has met the conditions for issuance in the two rules. Rule 40C-1.1002 establishes the requirements for obtaining a variance. The parties have stipulated that the project either complies with the following conditions for issuance of a permit or that they are not applicable: rules 40C-4.301(1)(a), (b), (c), (e), (g), (h), (i), (j), and (k); and 40C-4.302(1)(a)3., 5., and 6. Remaining at issue is whether reasonable assurance has been provided to demonstrate that the proposed activities will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters (40C-4.301(1)(d)); that the proposed activities will not cause adverse secondary impacts (40C-4.301(1)(f)); and that the portion of the project located in wetlands or the Lagoon is not contrary to the public interest (rules 40C-4.302(1)(a)1., 2., 4., and 7. and 40C-4.302(1)(b)). As a part of these claims, Petitioners also contend that the County failed to implement all practicable design modifications to reduce or eliminate the adverse impacts to wetland and surface water functions; the proposed mitigation fails to offset the adverse effects of the project; and the District did not consider the impacts of increased boat usage when reviewing secondary impacts generated by the project. Finally, Petitioners contend that the County has not shown that it meets the conditions in rule 40C-1.1002 for a variance. These contentions are addressed separately below. a. Rule 40C-4.301(1)(d) Pursuant to this rule, and related AH provisions, the County must give reasonable assurance that the proposed activity will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. To meet this requirement, the County has implemented, to the extent practicable, design modifications to reduce or eliminate adverse impacts to wetlands and other surface waters. The original application submitted in 2009 proposed impacts to 2.98 acres of wetlands and surface waters. Since that time, the County has reduced or eliminated its proposed wetland impacts by more than 50 percent. This was done by incorporating design modifications that eliminated the construction of a stormwater pond in wetlands and adding compensating stormwater treatment; shifting impacts out of critical fisheries and open water habitat within the southern impoundment to upland areas; installing a retaining wall along the trailer parking area to limit the fill slope impacts; and making minor modifications to reduce the project footprint in several locations. The County also eliminated and reduced adverse impacts to surface waters by reducing the width of the proposed dredge area so as to not impact the seagrass beds to the north and south of the channel and limiting the dredging to -2.5 MLW. That depth is consistent with the existing limitations adjacent to the dredge area and will not allow deeper draft vessels to use the boat ramp. The addition of a permit condition that requires the placement of "No Parking" signs along Oslo Road and limiting the parking of boat trailers to the 12 designated parking spaces will prevent an increase in boat traffic from the existing boat ramp. The installation of signage at the boat ramp advising boaters of the boat motor draft restriction and the year-round manatee slow speed zone will also reduce impacts. Finally, three sets of channel markers will also be installed to keep boaters within the designated channel. As discussed below, after these design modifications are implemented, the remaining impacts are sufficiently offset by mitigation proposed by the County. The District also considered the condition of the wetlands and surface waters to be impacted; their hydrologic connection; their uniqueness; location; and fish and wildlife utilization, and then evaluated the proposed mitigation. The more persuasive evidence supports a finding that the mitigation is sufficient to offset the proposed impacts. As required by the AH, the District provided a copy of the County's application to the Florida Fish and Wildlife Conservation Commission (FFWCC). Among other things, the FFWCC is the agency responsible for reviewing the County's MPP. The FFWCC indicated that the project is consistent with the County's MPP. It also recommended certain measures to be taken by the County, which are now included as conditions in the proposed permit. Petitioners assert that the National Marine Fisheries Service, a federal agency, considers the entire Lagoon, and the ditches extending into it, to be an essential fish habitat (EFH) that provides habitat required for the various life cycles of many types of fish. Petitioners contend that the project will result in impacts to the EFH adjacent to the proposed dredging areas, and that this type of impact cannot be mitigated. For the following reasons, this contention is rejected. First, the more persuasive evidence is that the area to be dredged contains less than 1.5 percent seagrass coverage, and channel markers will be used to keep boaters within the designated channels. Only around 200 square feet (0.005 acres) of seagrass will be affected, and not the much larger area that Petitioners assert will be impacted. No other impacts to seagrass are expected to result from the project, other than those identified and mitigated for during the application review. Second, the District considered the actual Lagoon impact area and determined that the same functions now being provided in that area will be provided by the proposed mitigation. Third, if one accepts Petitioners' assertion that EFH can never be mitigated, no permit could ever be issued for any project that would impact the Lagoon or any ditches connecting to it. Finally, based on the District's Uniform Mitigation Assessment Method (UMAM) evaluation, the functional loss, including direct and secondary impacts, was scored at 1.212 while the functional gain was 1.281. See Fla. Admin. Code Ch. 62-345. With 1.5 acres of direct impacts, one acre of secondary impacts, and 18 acres of mitigation, there are approximately 0.07 excess units of functional mitigation. The UMAM review was not credibly refuted. Petitioners failed to prove that the requirements of rule 40C-4.301(1)(d) have not been met. b. Rule 40C-4.301(1)(f) Rule 40C-4.301(1)(f) requires an applicant to provide reasonable assurance that a regulated activity will not cause adverse secondary impacts to the water resources. Petitioners contend that the project will increase the number and size of boats that use the boat ramp and therefore cause secondary impacts to seagrasses, manatees, and water quality. Secondary impacts occur outside the direct footprint of the project but are very closely linked and causally related to the activity to be permitted. De minimis or remotely related secondary impacts are not considered. To assess secondary impacts, the District evaluates the impacts to wetlands and surface water functions; upland habitat for aquatic or wetland dependent species; and historical and archaeological resources. The project will result in 0.86 acres of secondary impacts to the remaining wetlands adjacent to the road paving and parking area and 0.14 acres of secondary impacts associated with sloughing and boat wake-related impacts. The County has proposed mitigation that will adequately offset the expected secondary impacts. In combination with dredging to only -2.5 MLW and reducing parking space for boat trailers, the mitigation will prevent additional secondary impacts. Also, the boat ramp is significantly smaller than the average boat ramp in the County and is designed specifically for small vessels. Thus, the ramp itself limits the size of the vessel that can launch at the site. Through the use of additional channel markers, signage, and a year-round slow speed zone, there should not be an increased threat of boat collisions with manatees, prop scarring of seagrass beds, or turbidity. Also, the removal of the muck from the channel will be beneficial and reduce turbidity in the nearby waters. Petitioners have stipulated that no wetland dependent listed species on site that use uplands for nesting or denning are at issue. There are no additional phases for this project. Speculation of a future interchange at Interstate 95 and Oslo Road, located many miles to the west of the boat ramp, and any impacts that might occur if one was ever built, was not considered under the District's secondary impact rule. Petitioners failed to prove that the requirements of the rule have not been met. c. Rule 40C-4.302 – Public Interest Test The public interest test for this type of project requires that the County provide reasonable assurance that activities to be located in, on, or over wetlands and other surface waters will not be contrary to the public interest, as determined by balancing seven criteria in subparagraphs 1.-7. of the rule. The test takes into account the positive, negative, and neutral effects of the activity. The parties have stipulated that subparagraphs 3. and 6. are not at issue. They govern navigation, shoaling, and erosion, and historical and archaeological resources. The navigation factor is positive and the archaeological resource factor is neutral. Subparagraph 1. requires the District to determine whether the activity will adversely affect the public health, safety, or welfare or the property of others. The more persuasive evidence supports a finding that the activities will not adversely affect the public health, safety, or welfare of the property of others. Presently, it is difficult to launch and load boats at the ramp due to the area being silted down. This can result in serious safety issues. By dredging this area, public safety will be enhanced. The installation of navigational channel markers and signage will also be beneficial to the public health, welfare, and safety, as will the year- round slow speed zone. This factor is positive. Subparagraph 2. requires the District to determine whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The evidence supports a finding that the proposed mitigation is appropriate and more than offsets the proposed impacts. The County eliminated and reduced impacts by more than one-half. The proposed dredging area contains less than 1.5 percent seagrass coverage. The project will not result in adverse impacts to manatee. Finally, the County is proposing 18 acres of mitigation, including the creation of an open water/tidal creek feature which will provide the same functions as the areas being impacted. This factor is positive. Subparagraph 4. requires the District to determine whether the activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project. The evidence supports a finding that the 18 acres of mitigation will improve marine productivity by providing a substantial amount of both mangrove and salt marsh vegetation along the sides of the tidal creek and open water component of fisheries. Also, the County has eliminated and reduced impacts to seagrasses by limiting the dredging area to an area with less than 1.5 percent seagrass coverage. Finally, it has removed the stormwater system from the southern impoundment to avoid a critical fisheries open water habitat. This factor is positive. Subparagraph 5. requires the District to determine whether the activity will be of a temporary or permanent nature. Because the mitigation offsets the adverse impacts, and the mitigation and dredging areas are both permanent in nature, the temporary or permanent factor is neutral. Subparagraph 7. requires an evaluation of the current condition and relative value of the functions being performed by areas affected by the proposed activity. The current condition and relative functions being performed by the areas affected by the project are high functioning. The evidence shows that the project will not change this high functioning aspect of the area. The District also conducted a UMAM review, which considered the relative value of plant communities, hydrology, and other factors, and demonstrated that the mitigation more than offsets the impacts. Finally, the County established that the mitigation area provides the same functions as the impact areas. Therefore, this factor is positive. The District's determination that the project will not be contrary to the public interest is supported by a preponderance of the evidence. Variance Because a portion of the project will be within Class III waters classified by DEP as restricted for shellfish harvesting, the County must qualify for and obtain a variance. A variance may be granted when an applicant demonstrates that it would suffer a hardship, not self-imposed, if the variance is denied. See Fla. Admin. Code R. 40C-1.1002. In determining whether a variance should be approved, the District balances the social, economic, and environmental impacts on the applicant, the residents of the area, and on the State with those same impacts if the variance is denied. The County has demonstrated that the application of rule 40C-4.302(1)(c) and AH sections 10.1.1(c), 12.1.1(d), and 12.2.5(c) would create a hardship in this case by precluding the construction of the proposed accessory dock extension and the dredging of an existing ingress/egress way within the Lagoon that will improve public safety and enhance recreational opportunities for the citizens of the area. There are no viable alternatives that would address the functionality and safety of the existing boat ramp. The hardship is not self-imposed in that the normal processes of erosion, wind, and tides contribute to the accumulation of sand and muck within the ingress/egress access way, which over time has impeded the process of launching and loading vessels at the boat ramp. The narrow channel is bordered on the north and south by productive seagrass beds. The extension of the accessory dock and dredging of the access channel will expedite the loading process and reduce the need for boat operators to circle in the shallow waters waiting their turn to access the ramp. The environmental impact of the project is positive. There will be no harm to the water quality of Class III waters and the shellfish beds. The Department of Agriculture and Consumer Affairs reviewed the project and concluded that it would not result in a reclassification of shellfish harvesting waters. The stormwater treatment on the uplands will result in a reduction of nutrient loading to the Lagoon, which is now designated by DEP as impaired by nutrients. The extension of the accessory dock, along with making the area a year-round slow speed zone, will reduce potential impacts to manatees. The dredging and extension of the dock will be a convenience to the boating public and may enhance public safety during periods of inclement weather or other exigent circumstances. Petitioners failed to prove that all requirements for a variance have not been met.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order granting the County's applications for an ERP and a variance. DONE AND ENTERED this 5th day of August, 2014, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of August, 2014. COPIES FURNISHED: Hans Tanzler, III, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Marcy I. LaHart, Esquire Marcy I. LaHart, P.A. 4804 Southwest 45th Street Gainesville, Florida 32608-4922 Karen C. Ferguson, Esquire St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 William K. DeBraal, Esquire Indian River County Attorney's Office 1801 27th Street Vero Beach, Florida 32960-3388

Florida Laws (3) 120.569373.414403.201
# 5
RICHARD SLUGGETT vs. DEPARTMENT OF ENVIRONMENTAL REGULATION AND ENVIRONMENTAL REGULATION COMMISSION, 86-001846 (1986)
Division of Administrative Hearings, Florida Number: 86-001846 Latest Update: Dec. 18, 1986

Findings Of Fact Upon consideration of my observation of the witnesses and their demeanor while testifying, documentary evidence received including the parties pre- hearing stipulation, the following relevant facts are found: Respondent DOT filed a dredge and fill permit based on its application filed with Respondent DER and proposed to upgrade a 4.9 mile segment of State Road 80 from a 2-lane roadway to a rural 4-lane divided roadway which included construction of new north and south bound bridges over a canal (designated as L- 8) and constructing a triple box culvert to replace the existing bridge over Callery Judge Canal, located from 20 mile bend to 5.5 miles west of State Road 7, Palm Beach County, Florida. (Joint Composite Exhibit 1). Respondent DER published the required notice of its intent to issue the applied for permit by DOT in the April 14, 1986 edition of the Palm Beach Post Times, a newspaper of general circulation. Petitioner is the fee simple owner of the property located to the west of Callery Judge Canal. Petitioner's property includes a drainage easement which has been given to the Seminole Water Management District and includes submerged portions of the canal. Callery Judge Canal is a water control structure. Callery Judge Canal is connected to another canal designated as C-51, which is also a water control structure. The length of Callery Judge from the C-51 Canal extends approximately 400 feet. There are water control structures at the end of Callery Judge Canal and approximately 4 miles both east and west of the C-51 Canal. As such, there is limited navigability of the C-51 Canal by Petitioner. The C-51 Canal is used by Petitioner and unidentified public members for recreational navigation purposes. There is no commerce navigation on either the C-51 or Callery Judge Canal. Petitioner currently has navigational access to C-51 through Callery Judge. Petitioner owns two boats which he has from time to time used on the Callery Judge Canal to get to the C-51 Canal. Both C-51 and Callery Judge Canal are Class 3 water bodies. Respondent DER has dredge and fill jurisdiction over both canals as they connect to state waters. Respondent DOT, in addition to publishing notice in the Palm Beach Post Times, sent written notice to adjacent property owners advising them of DOT's application and only Petitioner protested based on his claim of impaired navigation from Callery Judge to C-51. Additionally, Petitioner objected on the basis that the project would adversely affect his riparian rights of access to C-51 and that the effect of issuing of the requested permits would amount to the taking of private property without first making payment of full compensation to him. The existing bridge which expands Callery Judge Canal does not meet state safety practices inasmuch as there is only the approximately 2 feet between the edge of the travel lane to the face of the railing. This space provides only a 2 foot recovery lane for disabled vehicles. With the triple box culverts as applied for by DOT, an adequate recovery lane of approximately 10 feet will be provided which meets state safety requirements for recovery lanes. (Testimony of Midgett). The triple box culverts will allow for DOT to complete its planned widening of the bridge on both ends and thereby eliminate adverse safety concerns relating to traffic "bottle necking." Fish, alligators, and other wildlife will be able to continue passing from Callery Judge to C-51 after installation of the triple box culverts as proposed by DOT and therefore there will be no adverse impacts on fish and wildlife conservation. The proposed culverts will allow drainage to continue and water flow will not be constricted. Following construction of the triple box culverts, Petitioner may continue to enjoy other riparian rights that he presently enjoys. Thus, Petitioner may continue to swim and bathe in Callery Judge Canal. Petitioner may also continue to navigate Callery Judge for fishing and other recreational purposes. There are no marinas, boat lifts, boat ramps or other facilities on C- 51 or Callery Judge Canals which would provide navigation access to the canals by the general public. The one boat facility in either canal is a boat ramp in C-51 maintained by the South Florida Water Management District. The Palm Beach County Health Department, a local approved DER program, (pursuant to Section 403.916, Florida Statutes), reviewed the subject application and determined that DOT's application, with modifications incorporated in Respondent DER's intent to issue, provided the reasonable assurances and was in the public interest pursuant to Section 403.918(2), Florida Statutes. Petitioner's riparian rights to navigate Callery Judge Canal and access to C-51 would be impaired by the Respondent DOT's installation of the triple box culverts as applied for. However, when these adverse impacts are balanced against the other factors as required pursuant to Section 403.918(2), Florida Statutes, Petitioner's adverse impacts are considered to be negligible. Respondent DOT has provided Respondent DER reasonable assurances that water quality standards will not be violated based on the proposed project. Respondent DOT has provided Respondent DER reasonable assurances that by use of turbidity screens during construction of the culverts, turbidity values 50 feet down stream from the project site will not exceed 29 N.T.D.'s above background.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Respondent, Department of Environmental Regulation, grant Respondent, Department of Transportation, a dredge and fill permit as set forth with the conditions accompanied in its Notice of Intent to Issue, based on the determination herein that the proposed activities are not contrary to the public interest. RECOMMENDED this 18th day of December, 1986, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of December, 1986. APPENDIX TO RECOMMENDED ORDER, CASE NO. 86-1846 Rulings on Respondent, Department of Environmental Regulation's proposed Recommended Order. Paragraph 12, adopted as modified, paragraphs 12, 17 and 18, Recommended Order. Paragraph 13, adopted as modified, paragraphs 15 and 16, Recommended Order. Paragraph 18, rejected as unnecessary for resolution of the issues. Paragraph 19, adopted as modified, paragraph 15, Recommended Order. Paragraph 21, first sentence adopted and remainder rejected as being speculative or conclusionary. Paragraph 24 the parties Stipulation and other statements respecting the parties positions were not incorporated in the Recommended Order as being unnecessary or was not the subject of testimony based on the stipulation. Rulings on Respondent, Department of Transportation's proposed Recommended Order. Paragraph 1 adopted as modified, paragraph 8, Recommended Order. Statutory and Code provisions are not recited in the Recommended as findings of fact. However, official notice was taken of the pertinent rules, regulations and statutory provisions. Paragraph 4 substantially adopted, paragraphs 3, 4 and 5, Recommended Order. Paragraph 12 rejected as being unnecessary to determine the issues posed herein and based on the ultimate determination that the project was in the public interest, paragraph 15, Recommended Order. Rulings on Petitioner's proposed Recommended Order. Paragraph 5, first sentence attributable to Respondent, Department of Transportation, rejected as no evidence was introduced to substantiate that Respondent DOT was unaware that Petitioner was owner and holder of a riparian property right of access. Paragraph 4, last sentence rejected as evidence adduced indicates that Petitioner's rights to gain access between his riparian lands and the C-51 canal was considered, paragraph 16, Recommended Order. Paragraph 5, last sentence rejected as there was a determination that the proposed project was in the public interest and that any impairment of Petitioner's access was counter balanced against public considerations as required in Section 403.918(2), Florida Statutes. Paragraph 16, Recommended Order. Paragraph 6, rejected as being contrary to other credited evidence which indicates that the proper balancing test was in fact made. See paragraphs 10-18, Recommended Order which deals with the consideration of the public interest criteria set forth in Section 403.918(2), Florida Statutes. COPIES FURNISHED: Mark S. Ulmer, Esquire 200 SE Sixth Street, Suite 404 Ft. Lauderdale, Florida 33301 Mel Wilson, Esquire Department of Transportation Mail Station 58 605 Suwannee Street Tallahassee, Florida 32301 Karen A. Brodeen, Esquire Department of Environmental Regulation 2600 Blair Stone Road Twin Towers Office Building Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (2) 120.57403.815
# 6
ERICH SCHLACHTA AND ESTER SCHLACHTA vs. CITY OF CAPE CORAL, PARKS AND RECREATION DEPARTMENT, 80-002258 (1980)
Division of Administrative Hearings, Florida Number: 80-002258 Latest Update: Jul. 16, 1981

Findings Of Fact The Petitioners are, and at all times material hereto were, owners of residential real property adjoining the site of the proposed construction to the northwest. The City of Cape Coral is, and at all times material hereto was, the applicant for the permit from the Department of Environmental Regulation for the construction of the proposed project, which is a public boat ramp. This boat ramp is located within the corporate limits of the City of Cape Coral. The Department of Environmental Regulation is, and at all times material hereto was, the agency of the State of Florida which has the authority to issue permits for dredging, filling or other activities of a similar nature to include construction of boat ramps on the shores or banks of navigable waterways of the state. The Caloosahatchee River is a navigable, Class III waterway of the State of Florida. Lands covered by the waters of the Caloosahatchee River at the location of the proposed project are submerged lands of the State of Florida. The City applied to the Department on March 27, 1980, for a permit to construct a boat ramp on the Caloosahatchee River at the Cape Coral Yacht Club. A boat ramp currently is located at the site of the proposed project. The existing ramp was initially partially constructed in 1964, and subsequently a seawall was removed and the two existing seawalls projecting into the water were constructed in 1969. The City's application was initially incomplete, lacking evidence of approval by the City Council. At the request of the Department, the City submitted additional information. The application as originally proposed contemplated dredging waterward of the mean high water line at the proposed project site. The dredged material was to be placed along a beach area adjacent to the proposed boat ramp, and the spoil would have projected waterward of the mean high water line. The proposed project was revised in September, 1980, to delete placing the dredged material on the adjacent beach. The revised project would retain the dredged material landward on the mean high water line until it had dried, at which time it would be removed from the site. After the dredging described above has been completed, the revised project calls for the construction of a concrete boat ramp 42 feet wide and 58 feet long extending approximately 28 feet waterward of the mean high water line of the Caloosahatchee River. In addition, three timber poling walkways at the sides of and in the middle of the boat ramp will be constructed extending waterward of the mean high water line. On May 10, 1980, Dan Garlick, an employee of the Department, conducted a Permit Application Appraisal and concluded the project would have an insignificant impact on biological resources or water quality, and would comply with Chapters 17-3 and 17-4, Florida Administrative Code. Garlick recommended approval of the project. David Key, another employee of the Department, conducted an on-site investigation and expressed concurrence with the findings contained in Garlick's report. Key also noted that no adverse impact on navigation was anticipated as a result of the project. On July 1, 1980, the National Marine Fisheries Service and US Fish and Wildlife Service investigated the proposed project. These federal agencies had no objection to the proposed boat ramp or the dredging aspects of the proposed project. These agencies had no objection to the proposed spoil basis located in the upland area of the site required to dry the dredged material. These agencies objected only to placement of the dredged material on the adjoining beach, which proposal was deleted in the City's revised plan. Petitioners introduced no expert testimony relating to the effects of the proposed project on water quality, marine resources or navigation. Lay testimony was received regarding conditions around the site of the existing boat ramp. Garbage, dead fish and flotsam accumulate at or near the site in the water and on the land. The existing seawalls extending perpendicular from the shore prevent matter in the water from being flushed by the current and tides. In the proposed project the seawall to the right of the existing boat ramp would not be removed. Prior to January, 1981, the existing ramp site was not regularly cleaned by the City. Since that date the area has been cleaned regularly; however, after weekends when the facility is most heavily used there are large quantities of refuse and garbage around the site. The City has requested and received permission from and payment has been made to the Department of Natural Resources for use of sovereignty submerged lands and the removal of 215 cubic yards of fill. After a review of the revised application, the Department gave notice of its intent to issue a permit for the proposed project by letter dated November 10, 1980. The Department based its intent to issue on a determination that the project would not adversely affect navigation, marine resources or water quality, provided the conditions set in the letter were met. The Department's Exhibit 2 is the only documentation presented by the City reflecting the City Council's action on the application. Exhibit 2 contains no findings by the local government that the proposed project would not violate any statute, zoning or ordinances; makes no findings that the project would present no harmful or increased erosion, shoaling of channels or stagnation of waters; and contains no findings that no material injury or monetary damage will result to adjoining land. The Petitioner's Exhibit 1, Minutes of the City Council for the City of Cape Coral Meeting of June 18, 1980, does not reflect that the final reports on the ecological effects of the proposed project were read into the record, and does not reflect that those reports were duly considered by the Council. It was at this meeting that final action on the application for permitting of the proposed project was presumably taken. However, the motion approved at that meeting did not authorize approval of the proposed project nor issuance of the permit. The motion empowered the Mayor to write a letter expressing approval. This motion presumable resulted in the letter of June 17, 1980, the Department's Exhibit 2, which was signed by the City Manager and not the Mayor.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law the Hearing Officer recommends that the agency head withhold final action on the application for a reasonable period of time to permit the applicant to cure the procedural defects. Upon curing the procedural defects, the Hearing Officer would recommend issuance of the permits originally requested. DONE and ORDERED this 12th day of June, 1981, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of June, 1981. COPIES FURNISHED: Daniel Sasso, Esquire Post Office Box 1422 1413 Cape Coral Parkway Cape Coral, Florida 33904 Richard Roosa, Esquire 1714 Cape Coral Parkway Post Office Box 535 Cape Coral, Florida 33904 Paul R. Ezatoff, Jr., Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION ERICH SCHLACHTA and ESTER SCHLACHTA, husband and wife, Petitioner, vs. CASE NO. 80-2258 CITY OF CAPE CORAL, PARKS AND RECREATION DEPARTMENT and STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION, Respondent. /

Florida Laws (4) 120.52120.57403.087403.813