KELLY BOAT SERVICES, INC., ET AL. vs. DEPARTMENT OF REVENUE, 76-001021 (1976)
Division of Administrative Hearings, Florida Number: 76-001021 Latest Update: Oct. 24, 1979

The Issue At issue herein is whether or not the Petitioner, Kelly Boat Service, Inc.'s and Cape Kennedy Charter Boats, et al's activities fall within the admissions tax liability imposed by Section 212.04, F.S. (1973). Based upon the pleadings filed herein, the documentary evidence introduced during the course of the hearing, the other evidence of record including the arguments of counsel, the following relevant facts are found.

Findings Of Fact In the instant matter, the Department of Revenue issued two sales tax assessments. The first such assessment is against Cape Kennedy Charter Boats and covers the audit period of March 1, 1973, through February 29, 1976. The Department also assessed Kelly Boat Service, Inc., in a series of three separate assessments covering the audit periods August 1, 1970, through January 31, 1976. Based on such assessments, a tax liability resulted in the amount of $25,072.37. Of this amount, $10,000 was paid by the tax payer on July 21, 1976 (Respondent's Composite Exhibit No. 1). The remaining tax liability plus interest which has accrued from July 21, 1976, is outstanding and continues to accrue. During the course of the hearing, the parties agreed that the specific liabilities as set forth in the assessment were not at issue. Rather, Petitioner solely challenged the legal authority of the Department of Revenue to impose the assessments in question. The Petitioners are owners and operators of a fleet of deep sea fishing boats in and around Destin, Florida, which, for a fee, carry individual fishermen to certain fishing banks which lie beyond the three-league limit in the Gulf of Mexico. While there, the Petitioners sell food and drinks to the fishermen and rent them fishing equipment. The fishing is done at the snapper banks in the Gulf of Mexico or in the vicinity of those banks. The fishing equipment and tackle used on these trips are mainly used beyond the three-league limit in the waters of the Gulf of Mexico; and most, if not all, of the food and drinks sold at the galley of the refreshment stand on the boat was outside the three-league limit of the State of Florida. In an earlier summary final judgment, the Circuit Court of Appeal declared, as authorized by Chapter 86, Florida Statutes, 1973, the liability of Kelly Boat Services, Inc., for payment of the admissions tax by Section 212.04, F.S., 1973, from which the Department of Revenue filed an appeal. In that decision, the Court held that Kelly, whose boats take on passengers at Destin for fishing in the Gulf of Mexico beyond the territorial limits of Florida, is taxable at the statutory rate on the admission fare charged at the dock, but that the State is foreclosed from assessing Kelly for taxes that should have been paid between August, 1970, and the first day of August, 1973, the period in which the Department demanded the production of Kelly's records for audit. Section 212.14(6), F.S., 1973. Kelly cross-appealed and urged that its activities were not subject to the tax, citing Straughn v. Kelly Boat Service, Inc., 210 So.2d 266 (Fla.App. 1st 1968). In its decision, the First District Court of Appeal in Dept. of Revenue v. Kelly B Boat Service, Inc., 324 So.2d 351 (Fla. 1976), indicated that the trial court was correct in its reading of its decision in Dept. of Revenue v. Pelican Ship Corp., 257 So.2d 56 (Fla.App 1st 1972), Cert. Denied, 262 So.2d 682 (Fla. 1972), Cert. Dismissed, 287 So.2d 93 (Fla. 1974), and in hold that Kelly's commercial activities, as evidenced by the record, render it liable to assessment for the admissions tax. The Court noted that the trial court was incorrect, however, in foreclosing the Department of Revenue from making the assessment for the full three-year period authorized by Subsection 212.14(6), F.S., 1973. The decision goes on to read that the State is not foreclosed by reason of the Court's 1968 decision in Straughn v. Kelly Boat Service, Inc., or otherwise to assert that on the facts evidenced by record, Kelly should satisfy its full tax liability incurred three years prior to August 1, 1973. North American Company v. Green, 120 So.2d 603 (Fla. 1960); Jackson Grain Company v. Lee, 139 Fla. 93, 190 So. 464 (1939). Based on the above decision of the First District Court of Appeal, the Department's assessment, which the parties admit is factually correct, is valid both as to the August 1, 1970, through July 31, 1973, and the August 1, 1973, through January 31, 1976, audit periods. Since this matter has previously been adjudicated, the same is res judicata as to the legal validity of the Department's assessment. Further, since the assessment relative to Cape Kennedy Charter Boats is based upon the same factual circumstances and legal authority as the one against Kelly Boat Service, Inc., which was upheld as aforementioned in the case of the Dept. of Revenue v. Kelly Boat Service, Inc., supra, there is no factual challenge to the validity of the Department's assessment and there being no assertion by the Petitioner that any rules of law other than those enunciated by the District Court of Appeal in Dept. of Revenue v. Kelly Boat Service, Inc., supra, are applicable, such assessment must likewise be upheld. I shall so recommend. 1/

Recommendation Based on the foregoing findings of fact and conclusions of law, it is, hereby, RECOMMENDED: That the Department of Revenue's assessment in the instant matter against the Petitioners be UPHELD. Additionally, in view of the Petitioners' letter of April 11, 1979, Petitioners' motion to treat this matter as a class action is hereby DISMISSED. RECOMMENDED this 31st day of May, 1979, in Tallahassee, Leon County, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675

Florida Laws (3) 120.57212.04212.14
# 1
DAVID OKKER vs THE MG HERRING GROUP, INC., 17-005073 (2017)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Sep. 15, 2017 Number: 17-005073 Latest Update: Jul. 20, 2018

The Issue Whether Respondent, The MG Herring Group, Inc. (MG Herring), was an employer of Petitioners.

Findings Of Fact Xencom provides general maintenance, landscaping, housekeeping, and office cleaning services to retail facilities. In September of 2015, Xencom entered three contracts for services with CREFII Market Street Holdings, LLC (CREFII). The contracts were to provide maintenance, landscaping, and office cleaning services for a mall known as Market Street @ Heathbrook (Market Street) in Ocala, Florida. Michael Ponds, Xencom’s president, executed the contracts on behalf of Xencom. Two individuals executed the contracts on behalf of CREFII. One was Gar Herring, identified as Manager for Herring Ocala, LLC. The other was Bernard E. McAuley, identified as Manager of Tricom Market Street at Heathbrook, LLC. MG Herring was not a party or signatory to the contracts. MG Herring does not own or operate Market Street. A separate entity, The MG Herring Property Group, LLC (Property Group) operated Market Street. The contracts, in terms stated in an exhibit to them, established a fixed price for the year’s work, stated the scope of services, and detailed payment terms. They also identified labor and labor-related costs in detail that included identifying the Xencom employees involved, their compensation, and their weekly number of hours. The contract exhibits also identified operating costs, including equipment amortization, equipment repairs, fuel expenses, vacation costs, health insurance, and storage costs. The contracts ended December 31, 2016. The contracts specify that Xencom is an independent contractor. Each states: “Contractor is an independent contractor and not an employee or agent of the owner. Accordingly, neither Contractor nor any of Contractor’s Representatives shall hold themselves out as, or claim to be acting in the capacity of, an agent or employee of Owner.” The contracts also specify that the property manager may terminate the contract at any time without reason for its convenience. The contracts permit Xencom to engage subcontractors with advance approval of the property manager. They broadly describe the services that Xencom is to provide. Xencom has over 80 such contracts with different facilities. As the contracts contemplate, only Xencom exerted direct control of the Petitioners working at Market Street. Property Group could identify tasks and repairs to be done. Xencom decided who would do them and how. In 2013, Xencom hired Michael Harrison to work as its Operations Manager at Market Street. He was charged with providing services for which Property Group contracted. His immediate supervisor was Xencom’s Regional Manager. In 2016, that was David Snell. Mr. Snell was not located at Market Street. Property Group also did not have a representative on site. Before Xencom hired him, Mr. Harrison worked at Market Street for Property Group. Xencom hired the remaining Petitioners to work at Market Street under Mr. Harrison’s supervision. Each of the Petitioners completed an Application for Employment with Xencom. The application included a statement, initialed by each Petitioner, stating, “Further, I understand and agree that my employment is for no definite period and I may be terminated at any time without previous notice.” All of the Petitioners also received Xencom’s employee handbook. As Xencom’s Operations Manager and supervisor of the other Petitioners, Mr. Harrison was responsible for day-to-day management of Petitioners. He scheduled their work tasks, controlled shifts, established work hours, and assigned tasks. Mr. Harrison also decided when Petitioners took vacations and time off. His supervisor expected him to consult with Property Group to ensure it knew what support would be available and that he knew of any upcoming events or other considerations that should be taken into account in his decisions. As Operations Manager, Mr. Harrison was also responsible for facilitating payroll, procuring supplies, and managing Xencom’s equipment at the site. Xencom provided Petitioners work uniforms that bore Xencom’s name. Xencom required Petitioners to wear the uniforms at work. Xencom provided the supplies and equipment that Petitioners used at work. Only Xencom had authority to hire or fire the employees providing services to fulfill its contracts with the property manager. Only Xencom had authority to modify Petitioners’ conditions of employment. Neither MG Herring, Property Group, nor Xencom held out Petitioners as employees of MG Herring or Property Group. There is no evidence that MG Herring or Property Group employed 15 or more people. Property Group hired Tina Wilson as Market Street’s on- site General Manager on February 1, 2016. Until then there was no Property Group representative at the site. The absence of a Property Group representative on-site left Mr. Harrison with little oversight or accountability under the Xencom contracts for Market Street. His primary Property Group contact was General Manager Norine Bowen, who was not located at the property. Ms. Wilson’s duties included community relations, public relations, marketing, leasing, litigation, tenant coordination, lease management, construction management, and contract management. She managed approximately 40 contracts at Market Street, including Xencom’s three service agreements. Ms. Wilson was responsible for making sure the contracts were properly executed. Managing the Xencom contracts consumed less than 50 percent of Ms. Wilson’s time. During the last weeks of 2016, Mr. Harrison intended to reduce the hours of Kylie Smithers. Ms. Wilson requested that, since Ms. Smithers was to be paid under the contract for full- time work, Ms. Smithers assist her with office work such as filing and making calls. Mr. Harrison agreed and scheduled Ms. Smithers to do the work. This arrangement was limited and temporary. It does not indicate Property Group control over Xencom employees. Ms. Wilson was Xencom’s point of contact with Property Group. She and Mr. Harrison had to interact frequently. Ms. Wilson had limited contact with the other Xencom employees at Market Street. Friction and disagreements arose quickly between Mr. Harrison and Ms. Wilson. They may have been caused by having a property manager representative on-site after Mr. Harrison’s years as either the manager representative himself or as Xencom supervisor without a property manager on-site. They may have been caused by personality differences between the two. They may have been caused by the alleged sexual and crude comments that underlie the claims of discrimination in employment. They may have been caused by a combination of the three factors. On November 21, 2016, Norine Bowen received an email from the address xencomempoyees@gmail.com with the subject of “Open your eyes about Market Street.” It advised that some employees worked at night for an event. It said that Ms. Wilson gave the Xencom employees alcohol to drink while they were still on the clock. The email said that there was a fight among Xencom employees. The email also said that at another event at a restaurant where Xencom employees were drinking, Ms. Wilson gave Ms. Smithers margaritas to drink and that Ms. Smithers was underage. The email claimed that during a tree-lighting event Ms. Wilson started drinking around 3:30 p.m. It also stated that Ms. Wilson offered a Xencom employee a drink. The email went on to say that children from an elementary school and their parents were present and that Ms. Wilson was “three sheets to the wind.” The email concludes stating that Ms. Wilson had been the subject of three employee lawsuits. On December 14, 2016, Ms. Wilson, Ms. Bowen, and Mr. Snell met at Property Group’s office in Market Street for their regular monthly meeting to discuss operations at Market Street. Their discussion covered a number of management issues including a Xencom employee’s failure to show up before 8:00 to clean as arranged, security cameras, tenants who had not paid rent, lease questions, HVAC questions, and rats on the roof. They also discussed the email’s allegations. The participants also discussed a number of dissatisfactions with Mr. Harrison’s performance. Near the end of a discussion about the anonymous email, this exchange occurred:2/ Bowen: Okay, so I know that David [Snell], I think his next step is to conduct his own investigation with his [Xencom] people, and HR is still following up with John Garrett, and you’re meeting with Danny [intended new Xencom manager for Market Street] tonight? David Snell: Yes. Bowen: To finish up paperwork, and, based on his investigation, it will be up to Xencom to figure out what to do with people that are drinking on property, off the clock or on the clock, you know, whatever, what their policy is. * * * Bowen: So, I don’t know what to make of it. I’m just here to do an investigation like I’m supposed to do and David is here to pick up the pieces and meet with his folks one-on- one, and we’ll see where this takes us. This exchange and the remainder of the recording do not support a finding that Property Group controlled Xencom’s actions or attempted to control them. The participants were responsibly discussing a serious complaint they had received, their plan to investigate it, and pre-existing issues with Mr. Harrison. The exchange also makes clear that all agreed the issues involving Xencom employees were for Xencom to address, and the issues involving Property Group employees were for Property Group to address. At the time of the December 14, 2016, meeting, the participants were not aware of any complaints from Mr. Harrison or Mr. Smithers of sexual harassment or discrimination by Ms. Wilson. On December 15, 2016, Gar Herring and Norine Bowen received an email from Mr. Harrison with an attached letter to Xencom’s Human Resources Manager, and others. Affidavits from Petitioners asserting various statements and questions by Ms. Wilson about Mr. Harrison’s and Mr. Smithers’ sex life and men’s genitalia and statements about her sex life and the genitalia of men involved were attached. Xencom President Michael Ponds received a similar email with attachments on the same day. On December 21, 2016, Mr. Ponds received a letter from Herring Ocala, LLC, and Tricom Market Street at Heathbrook, LLC, terminating the service agreements. Their agreements with Xencom were going to expire December 31, 2016. They had been negotiating successor agreements. However, they had not executed any. Xencom terminated Petitioners’ employment on December 21, 2016. Xencom no longer needed Petitioners’ services once MG Herring terminated the contract with Xencom. This was the sole reason it terminated Petitioners.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Commission on Human Relations enter a final order denying the Petitions of all Petitioners. DONE AND ENTERED this 11th day of May, 2018, in Tallahassee, Leon County, Florida. S JOHN D. C. NEWTON, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 2018.

Florida Laws (4) 120.569120.57760.02760.10
# 2
FLORIDA LAND SALES, CONDOMINIUMS, AND MOBILE HOMES vs NIVARDO BEATON, 98-002378 (1998)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 19, 1998 Number: 98-002378 Latest Update: Feb. 02, 1999

The Issue Whether the Respondent committed the violation alleged in the Notice to Show Cause dated March 30, 1998, and, if so, the penalty which should be imposed.

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: The Department of Business and Professional Regulation, Division of Florida Land Sales, Condominiums and Mobile Homes, is the state agency responsible for licensing and regulating yacht and ship brokers in Florida. Section 326.003, Florida Statutes (1997). Nivardo Beaton is a resident of Miami, Florida. He is not now, and never has been, licensed as a yacht broker or salesperson. The Division has no record of any prior enforcement or disciplinary actions against Mr. Beaton. At the times material to this action, Mr. Beaton worked at Avanti Powerboats, where he did assembly, electrical installation, and motor installation work on the boats built by Avanti Powerboats. Although he was originally a salaried employee of Avanti Powerboats, at the times material to this action, Mr. Beaton worked on a "piece work" basis and was paid a flat fee when he completed rigging a boat. Mr. Beaton also had a verbal agreement with Raul Rodriguez, the owner of Avanti Powerboats, whereby he was to be paid a five-percent commission for each direct sale of an Avanti boat and a one-and-one-half- percent commission for each Avanti boat sold by a dealership he had recruited as an Avanti distributor. An advertisement appeared in the October 17, 1997, edition of South Florida Boat Trader in which "Beaton Boat Sales and Service - Nivardo Beaton" offered three new boats and three used boats for sale. The three new boats were all Avantis; the three used boats were a twenty-one-foot Corona, a thirty-five- foot Contender, and a thirty-three-foot Avanti. Mr. Beaton owned the Corona; the Contender was owned by a friend, and Mr. Beaton did not expect any compensation from the sale of this boat; and the Avanti, an open-decked fishing boat, had been taken in trade by Mr. Rodriguez and was owned by Avanti Powerboats. Pursuant to a verbal agreement with Mr. Rodriguez, Mr. Beaton was to receive a five percent commission on the sale of this used thirty-three- foot Avanti. The advertisement was seen by an employee of the Division, and, when the Division's records revealed that neither Mr. Beaton nor Beaton Boat Sales and Service were licensed to offer yachts for sale, an investigation was initiated. Peter Renje, the Division's investigator, contacted Mr. Beaton on November 19, 1997, and informed him that he could not offer for sale used boats over thirty-two feet in length with the expectation of compensation unless he was licensed as a yacht broker. After Mr. Renje's first visit, Mr. Beaton immediately contacted the South Florida Boat Trader and discontinued the advertisement. He also provided Mr. Renje with the materials he requested to assist him in his investigation. Mr. Beaton abandoned the idea of doing business under the name of Beaton Boat Sales and Service. Mr. Beaton never sold a boat or transacted any other commercial transaction through this business. The only action Mr. Beaton took under the name of Beaton Boat Sales and Service was placing the advertisement in the October 17, 1997, issue of the South Florida Boat Trader. Mr. Beaton has worked in the management and production areas of the boat-building industry for over twelve years; he began working in sales in 1997. Before working for Avanti Powerboats, he worked for a short time selling Boston Whalers, Zodiac Inflatables, and Key West Boats. He also was employed as a full-time salesman by Fisherman's Paradise, Inc., a division of Warren Craft Distributing, Inc., from January to June 1997. Mr. Beaton was aware at the time he placed the advertisement in the South Florida Boat Trader that a person must have a broker's license in order to sell used yachts. He was not aware at the time he placed the advertisement that he needed to have a broker's license to offer for sale the thirty-three-foot Avanti open fishing boat. The evidence presented by the Division is sufficient to establish that Mr. Beaton, doing business as Beaton Boat Sales and Service, offered for sale a used boat over thirty-two feet in length and that he expected to earn a commission if he sold the boat. The evidence is also sufficient to establish that Mr. Beaton worked with Avanti Powerboats as an independent contractor, that he cooperated with the Division in its investigation, that he immediately cancelled the subject advertisement, and that he did not do any business as Beaton Boat Sales and Service. Mr. Beaton's testimony that he was not aware that a thirty-three-foot open-decked fishing boat fell within the statutory definition of a yacht is accepted as credible. Although Mr. Beaton had a few months' experience in boat sales, there is no evidence to establish that he engaged in the sale of used boats or that he sold boats in excess of thirty-two feet in length. The evidence presented by the Division is, therefore, not sufficient to permit the inference that Mr. Beaton knew or should have known that offering for sale a used boat over thirty- two feet in length without a broker's license violated Chapter 326. Likewise, the evidence presented by the Division is not sufficient to permit the inference that Mr. Beaton intended to violate Chapter 326. There was no evidence presented by the Division to establish that any member of the public suffered any injury as a result of Mr. Beaton's action in advertising for sale the used Avanti.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Business and Professional Regulation, Division of Florida Land Sales, Condominiums and Mobile Homes, enter a final order finding Nivardo Beaton guilty of violating Section 326.004(1), Florida Statutes (1997); ordering Mr. Beaton to cease and desist from any other violations of Chapter 326, Florida Statutes, and the rules promulgated thereunder; and imposing a civil penalty in the amount of $250. DONE AND ENTERED this 13th day of October, 1998, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 13th day of October, 1998. COPIES FURNISHED: William Oglo, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-1007 Nivardo Beaton, pro se Beaton Boat Sales and Services 14812 Southwest 81 Street Miami, Florida 33193 Philip Nowicki, Ph.D., Director Division of Florida Land Sales, Condominiums and Mobile Homes 1940 North Monroe Street Tallahassee, Florida 32399-1030 Lynda L. Goodgame, General Counsel Department of Business and Professional Regulations 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (4) 120.569326.002326.003326.004 Florida Administrative Code (1) 61B-60.008
# 3
MICHAEL HARRISON vs THE MG HERRING GROUP, INC., 17-005067 (2017)
Division of Administrative Hearings, Florida Filed:Garden City, Florida Sep. 15, 2017 Number: 17-005067 Latest Update: Jul. 20, 2018

The Issue Whether Respondent, The MG Herring Group, Inc. (MG Herring), was an employer of Petitioners.

Findings Of Fact Xencom provides general maintenance, landscaping, housekeeping, and office cleaning services to retail facilities. In September of 2015, Xencom entered three contracts for services with CREFII Market Street Holdings, LLC (CREFII). The contracts were to provide maintenance, landscaping, and office cleaning services for a mall known as Market Street @ Heathbrook (Market Street) in Ocala, Florida. Michael Ponds, Xencom’s president, executed the contracts on behalf of Xencom. Two individuals executed the contracts on behalf of CREFII. One was Gar Herring, identified as Manager for Herring Ocala, LLC. The other was Bernard E. McAuley, identified as Manager of Tricom Market Street at Heathbrook, LLC. MG Herring was not a party or signatory to the contracts. MG Herring does not own or operate Market Street. A separate entity, The MG Herring Property Group, LLC (Property Group) operated Market Street. The contracts, in terms stated in an exhibit to them, established a fixed price for the year’s work, stated the scope of services, and detailed payment terms. They also identified labor and labor-related costs in detail that included identifying the Xencom employees involved, their compensation, and their weekly number of hours. The contract exhibits also identified operating costs, including equipment amortization, equipment repairs, fuel expenses, vacation costs, health insurance, and storage costs. The contracts ended December 31, 2016. The contracts specify that Xencom is an independent contractor. Each states: “Contractor is an independent contractor and not an employee or agent of the owner. Accordingly, neither Contractor nor any of Contractor’s Representatives shall hold themselves out as, or claim to be acting in the capacity of, an agent or employee of Owner.” The contracts also specify that the property manager may terminate the contract at any time without reason for its convenience. The contracts permit Xencom to engage subcontractors with advance approval of the property manager. They broadly describe the services that Xencom is to provide. Xencom has over 80 such contracts with different facilities. As the contracts contemplate, only Xencom exerted direct control of the Petitioners working at Market Street. Property Group could identify tasks and repairs to be done. Xencom decided who would do them and how. In 2013, Xencom hired Michael Harrison to work as its Operations Manager at Market Street. He was charged with providing services for which Property Group contracted. His immediate supervisor was Xencom’s Regional Manager. In 2016, that was David Snell. Mr. Snell was not located at Market Street. Property Group also did not have a representative on site. Before Xencom hired him, Mr. Harrison worked at Market Street for Property Group. Xencom hired the remaining Petitioners to work at Market Street under Mr. Harrison’s supervision. Each of the Petitioners completed an Application for Employment with Xencom. The application included a statement, initialed by each Petitioner, stating, “Further, I understand and agree that my employment is for no definite period and I may be terminated at any time without previous notice.” All of the Petitioners also received Xencom’s employee handbook. As Xencom’s Operations Manager and supervisor of the other Petitioners, Mr. Harrison was responsible for day-to-day management of Petitioners. He scheduled their work tasks, controlled shifts, established work hours, and assigned tasks. Mr. Harrison also decided when Petitioners took vacations and time off. His supervisor expected him to consult with Property Group to ensure it knew what support would be available and that he knew of any upcoming events or other considerations that should be taken into account in his decisions. As Operations Manager, Mr. Harrison was also responsible for facilitating payroll, procuring supplies, and managing Xencom’s equipment at the site. Xencom provided Petitioners work uniforms that bore Xencom’s name. Xencom required Petitioners to wear the uniforms at work. Xencom provided the supplies and equipment that Petitioners used at work. Only Xencom had authority to hire or fire the employees providing services to fulfill its contracts with the property manager. Only Xencom had authority to modify Petitioners’ conditions of employment. Neither MG Herring, Property Group, nor Xencom held out Petitioners as employees of MG Herring or Property Group. There is no evidence that MG Herring or Property Group employed 15 or more people. Property Group hired Tina Wilson as Market Street’s on- site General Manager on February 1, 2016. Until then there was no Property Group representative at the site. The absence of a Property Group representative on-site left Mr. Harrison with little oversight or accountability under the Xencom contracts for Market Street. His primary Property Group contact was General Manager Norine Bowen, who was not located at the property. Ms. Wilson’s duties included community relations, public relations, marketing, leasing, litigation, tenant coordination, lease management, construction management, and contract management. She managed approximately 40 contracts at Market Street, including Xencom’s three service agreements. Ms. Wilson was responsible for making sure the contracts were properly executed. Managing the Xencom contracts consumed less than 50 percent of Ms. Wilson’s time. During the last weeks of 2016, Mr. Harrison intended to reduce the hours of Kylie Smithers. Ms. Wilson requested that, since Ms. Smithers was to be paid under the contract for full- time work, Ms. Smithers assist her with office work such as filing and making calls. Mr. Harrison agreed and scheduled Ms. Smithers to do the work. This arrangement was limited and temporary. It does not indicate Property Group control over Xencom employees. Ms. Wilson was Xencom’s point of contact with Property Group. She and Mr. Harrison had to interact frequently. Ms. Wilson had limited contact with the other Xencom employees at Market Street. Friction and disagreements arose quickly between Mr. Harrison and Ms. Wilson. They may have been caused by having a property manager representative on-site after Mr. Harrison’s years as either the manager representative himself or as Xencom supervisor without a property manager on-site. They may have been caused by personality differences between the two. They may have been caused by the alleged sexual and crude comments that underlie the claims of discrimination in employment. They may have been caused by a combination of the three factors. On November 21, 2016, Norine Bowen received an email from the address xencomempoyees@gmail.com with the subject of “Open your eyes about Market Street.” It advised that some employees worked at night for an event. It said that Ms. Wilson gave the Xencom employees alcohol to drink while they were still on the clock. The email said that there was a fight among Xencom employees. The email also said that at another event at a restaurant where Xencom employees were drinking, Ms. Wilson gave Ms. Smithers margaritas to drink and that Ms. Smithers was underage. The email claimed that during a tree-lighting event Ms. Wilson started drinking around 3:30 p.m. It also stated that Ms. Wilson offered a Xencom employee a drink. The email went on to say that children from an elementary school and their parents were present and that Ms. Wilson was “three sheets to the wind.” The email concludes stating that Ms. Wilson had been the subject of three employee lawsuits. On December 14, 2016, Ms. Wilson, Ms. Bowen, and Mr. Snell met at Property Group’s office in Market Street for their regular monthly meeting to discuss operations at Market Street. Their discussion covered a number of management issues including a Xencom employee’s failure to show up before 8:00 to clean as arranged, security cameras, tenants who had not paid rent, lease questions, HVAC questions, and rats on the roof. They also discussed the email’s allegations. The participants also discussed a number of dissatisfactions with Mr. Harrison’s performance. Near the end of a discussion about the anonymous email, this exchange occurred:2/ Bowen: Okay, so I know that David [Snell], I think his next step is to conduct his own investigation with his [Xencom] people, and HR is still following up with John Garrett, and you’re meeting with Danny [intended new Xencom manager for Market Street] tonight? David Snell: Yes. Bowen: To finish up paperwork, and, based on his investigation, it will be up to Xencom to figure out what to do with people that are drinking on property, off the clock or on the clock, you know, whatever, what their policy is. * * * Bowen: So, I don’t know what to make of it. I’m just here to do an investigation like I’m supposed to do and David is here to pick up the pieces and meet with his folks one-on- one, and we’ll see where this takes us. This exchange and the remainder of the recording do not support a finding that Property Group controlled Xencom’s actions or attempted to control them. The participants were responsibly discussing a serious complaint they had received, their plan to investigate it, and pre-existing issues with Mr. Harrison. The exchange also makes clear that all agreed the issues involving Xencom employees were for Xencom to address, and the issues involving Property Group employees were for Property Group to address. At the time of the December 14, 2016, meeting, the participants were not aware of any complaints from Mr. Harrison or Mr. Smithers of sexual harassment or discrimination by Ms. Wilson. On December 15, 2016, Gar Herring and Norine Bowen received an email from Mr. Harrison with an attached letter to Xencom’s Human Resources Manager, and others. Affidavits from Petitioners asserting various statements and questions by Ms. Wilson about Mr. Harrison’s and Mr. Smithers’ sex life and men’s genitalia and statements about her sex life and the genitalia of men involved were attached. Xencom President Michael Ponds received a similar email with attachments on the same day. On December 21, 2016, Mr. Ponds received a letter from Herring Ocala, LLC, and Tricom Market Street at Heathbrook, LLC, terminating the service agreements. Their agreements with Xencom were going to expire December 31, 2016. They had been negotiating successor agreements. However, they had not executed any. Xencom terminated Petitioners’ employment on December 21, 2016. Xencom no longer needed Petitioners’ services once MG Herring terminated the contract with Xencom. This was the sole reason it terminated Petitioners.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Commission on Human Relations enter a final order denying the Petitions of all Petitioners. DONE AND ENTERED this 11th day of May, 2018, in Tallahassee, Leon County, Florida. S JOHN D. C. NEWTON, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 2018.

Florida Laws (4) 120.569120.57760.02760.10
# 4
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs JACK V. ORGANO, 11-000245PL (2011)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Jan. 14, 2011 Number: 11-000245PL Latest Update: Nov. 12, 2019

The Issue The issues in these cases are whether Respondent violated sections 489.129(1)(i), 489.129(1)(o), and 489.1425, Florida Statutes (2007 & 2009),1/ and, if so, what discipline should be imposed.

Findings Of Fact At all times material to the administrative complaints, Mr. Organo was licensed as a certified general contractor in the State of Florida, having been issued license number CGC 1512005. At all times material to the administrative complaints, Mr. Organo was the primary qualifying agent for Bennett Marine Contracting and Construction, Inc. (Bennett Marine). On or about September 29, 2007, Jean Walker (Ms. Walker) entered into a contract with Bennett Marine to construct a dock and a tiki hut at 12305 Boat Shell Drive. The contract (the Walker contract) provided that the contractor would make application for a permit from Lee County, Florida. Mr. Organo signed the Walker contract for Bennett Marine. It is undisputed that the Walker contract did not include a written statement explaining Ms. Walker's rights under the Florida Homeowners' Construction Recovery Fund. On October 24, 2007, Bennett Marine applied for a permit to construct the dock. The application was denied October 29, 2007, because the site plan contained the tiki hut. When the tiki hut was removed from the application, the dock permit was approved. Ms. Walker paid Bennett Marine draws on the construction project. The payments were given to Mr. Organo. The payments totaled $9,200. By February 2008, a tiki hut had been constructed on Ms. Walker's property without a permit. Because the tiki hut was built without a permit, and it was in an illegal location, Lee County required that the tiki hut be removed. By April 2008, the tiki hut had been removed, and another tiki hut had been built in its place. Again, no permit was pulled for the tiki hut, and it was placed in an illegal location. Again, Lee County required that the tiki hut be removed. Mr. Organo subcontracted the construction of the tiki hut to Rick Fewell Chickees. Mr. Fewell of Rick Fewell Chickees, a Seminole Indian,2/ applied for a permit to build a tiki hut, but the application was rejected because the plot plan was not to scale, and the tiki hut did not meet the setback requirements from the water. Another tiki hut was built, and, in March 2009, Lee County again cited Ms. Walker for not having a permit for the tiki hut and for not meeting the setback requirements. In 2010, a permit was finally issued for the construction of a tiki hut on Ms. Walker's property. The permit was issued to Ms. Walker. Bennett Marine commenced work on the tiki hut without obtaining a building permit. On January 5, 2010, Bennett Marine entered into a contract with Chris Bevan (Mr. Bevan) to remove an existing dock, uninstall an existing boatlift, construct a dock, construct a tiki hut, and to reinstall the boatlift. The contract (the Bevan contract) required that the contractor obtain a City of Cape Coral building permit. The Bevan contract was signed by Mr. Organo for Bennett Marine. It is undisputed that the Bevan contract did not contain a written statement explaining Mr. Bevan's rights under the Florida Homeowners' Construction Recovery Fund. On March 17, 2010, Bennett Marine showed up on Mr. Bevan's property and commenced work, by knocking down a cantilever dock that was hanging over a seawall, removing old decking from the boatlift, and rough-framing part of the new dock. Bennett Marine worked until approximately March 25, 2010. That was the last that Mr. Bevan heard from Mr. Organo or Bennett Marine. Mr. Organo applied for a building permit for the Bevan contract on April 1, 2010. The permit was approved on April 13, 2010, but it was not issued. On May 14, 2010, the City of Cape Coral placed a stop-work order on the Bevan project. Mr. Bevan applied for an owner-builder permit for the dock construction, and the permit was issued on June 9, 2010. Mr. Bevan completed the dock construction at additional expense.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding that Mr. Organo violated sections 489.129(1)(i), 489.129(o), and 489.1425; imposing a fine of $250 each for the Walker contract and the Bevan contract for a total of $500, for failure to advise the owners of the recovery fund; imposing a fine of $3,000 and placing Mr. Organo on probation for two years for beginning work without a permit for the Walker contract; and imposing a fine of $1,000 and placing Mr. Organo on probation for one year for beginning work on the Bevan contract without a permit with the one-year probation to run concurrently with the probation imposed for the Walker contract. DONE AND ENTERED this 13th day of April, 2011, in Tallahassee, Leon County, Florida. S SUSAN B. HARRELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of April, 2011.

Florida Laws (5) 120.569120.57489.1195489.129489.1425
# 5
JEFFREY RAY SUNDWALL vs FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION, 19-004039 (2019)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 30, 2019 Number: 19-004039 Latest Update: Jun. 12, 2020

The Issue Whether the Florida Fish and Wildlife Conservation Commission (“the Commission”) correctly determined that a sailboat owned by Jeffrey Sundwall was a “derelict vessel” within the meaning of section 823.11(1)(b)1., Florida Statutes (2017),1 and thus subject to sections 376.15(3)(a) and 705.103, Florida Statutes.

Findings Of Fact Based on the evidence adduced at the final hearing, and the record as a whole, the following Findings of Fact are made: The Parties The Commission is empowered to remove, or cause to be removed, derelict vessels from Florida’s public waters. §§ 376.15(3)(a) and 823.11(3), Fla. Stat. A vessel is considered to be “derelict” if it is left, stored, or abandoned “[i]n a wrecked, junked, or substantially dismantled condition upon any public waters of this state.” § 823.11(1)(b)1., Fla. Stat. Mr. Sundwall was the registered owner of a 28-foot sailboat named the Sea Joy. Facts Specific to the Instant Case Lieutenant Andy Cox of the Commission found the Sea Joy anchored off Wisteria Island in the Florida Keys on March 27, 2017. The Sea Joy had an expired registration decal, and a large amount of seaweed on the outboard motor, which probably rendered the motor inoperative. The Sea Joy had been left open and exposed to the elements, and Lieutenant Cox observed one-inch deep, green water inside the vessel. Lieutenant Cox also determined that the Sea Joy had no working bilge pumps or battery power. Lieutenant Cox initiated a derelict vessel investigation. While the Commission did not take custody of the Sea Joy at that time, Lieutenant Cox affixed a large, red sticker to the Sea Joy announcing that the vessel’s owner had 5 days before the Commission disposed of it pursuant to its authority under chapter 705. Lieutenant Cox met with Mr. Sundwall on approximately March 28, 2017, in a Florida Keys jail and served him with three infraction citations. Lieutenant Cox also provided Mr. Sundwall with a written notice indicating the Commission considered the Sea Joy to be a derelict vessel. On July 24, 2017, the County Court for Monroe County issued an Order requiring the Monroe County Sheriff’s Office and the Commission to preserve the Sea Joy as essential evidence in a criminal case against Mr. Sundwall. Thus, the Sea Joy could not be “destroyed, removed, altered, moved, or otherwise disposed of.” After Hurricane Irma struck Florida in September of 2017 and wrecked several hundred vessels, the Commission partnered with the Coast Guard in an effort to identify and remove derelict vessels. If an owner of a derelict vessel waived his or her ownership interest, then the State of Florida would not charge for a vessel’s removal and disposal.2 Wisteria Island is owned by the FEB Corporation. In November of 2017, the Commission found the Sea Joy hard aground on the shore of Wisteria Island, and the Sea Joy could not be moved without mechanical assistance. The Sea Joy had no mast or sail, and the vessel was still left open and exposed to the elements. In sum, the Sea Joy was nothing more than a hull at that point. Contemporaneous photographs and video of the Sea Joy indicate that it was resting on “wrack lines” left by the tide. Those wrack lines demonstrated that the Sea Joy was on public waters at high tide.3 In response to a request for reconsideration from the State of Florida, the Monroe County Court issued an Order on December 12, 2017, allowing the State to remove the Sea Joy from Wisteria Island. On December 17, 2017, the Commission transported the Sea Joy to a marina in Marathon, Florida. 2 The Commission’s attorney announced during the final hearing that the Commission would not seek to recover the costs of removing and disposing of the Sea Joy from Mr. Sundwall. Ordinarily, the owner of a derelict vessel is responsible for all costs associated with its removal and destruction. See §§ 376.15(3)(a), 705.103(4), and 823.11(3)(b), Fla. Stat. However, in the aftermath of Hurricane Irma, the State of Florida assumed all of those costs. 3 This finding is based on the testimony of Major Robert Rowe of the Commission, and the undersigned found him to be a credible and persuasive witness. Officer David Bellville of the Commission met with Mr. Sundwall on January 4, 2018, at the Stock Island Detention Center in Key West. Officer Bellville served Mr. Sundwall with a notice stating that he had 30 days to take possession of the Sea Joy or it would be destroyed pursuant to the Commission’s authority under chapter 705. Officer Bellville also served Mr. Sundwall with an election of rights form stating he had 21 days to protest the Commission’s proposed action. Mr. Sundwall declined to waive his property interest in the Sea Joy and ultimately executed the election of rights form and a request for an administrative hearing on January 20, 2018. Mr. Sundwall’s hearing request was postmarked on January 23, 2018, and received by the Commission on January 29, 2018. Because Mr. Sundwall’s documents were received after the 21-day deadline, the Commission had the Sea Joy destroyed on February 21, 2018, and issued an Order on March 6, 2018, dismissing Mr. Sundwall’s hearing request with prejudice. Mr. Sundwall appealed the Commission’s Order to the First District Court of Appeal, and the appellate court issued an opinion in Sundwall v. Florida Fish & Wildlife Conservation Commission, 271 So. 3d 1239 (Fla. 1st DCA 2019), on May 16, 2019, reversing and remanding the Commission’s dismissal: After Hurricane Irma struck Florida in 2017, the Florida Fish and Wildlife Conservation Commission (FWC) identified Mr. Sundwall as the owner of a boat declared derelict upon the waters of Florida. See § 823.11, Fla. Stat. (2017) (defining derelict vessels and empowering FWC to deal with them). Mr. Sundwall was incarcerated at the time. FWC sent Mr. Sundwall notice of the declaration, an explanation of his rights, an Election of Rights form, and a form for a Petition for Administrative Proceeding. The notice stated that a failure to make any election within twenty-one days from receipt of the notice would constitute a waiver of the right to a hearing. Mr. Sundwall signed a receipt for these documents on January 4, 2018. The twenty-first day after that fell on January 25, 2018. He signed the Election of Rights form, requesting a hearing; and also completed the Petition for Administrative Proceeding, dating both of his signatures January 20, 2018. There was no certificate of service or institutional date stamp on any of the papers, nor any institutional mail log indicating when he gave the papers to prison officials. The envelope was postmarked January 23, 2018. FWC stamped it as received on January 29, 2018. FWC dismissed the petition with prejudice because FWC did not receive it within twenty-one days and Mr. Sundwall did not request an extension within that period. FWC's order of dismissal acknowledged that the envelope from Mr. Sundwall was postmarked January 23, 2018. However, FWC relied on Florida Administrative Code Rule 28- 106.104(1), which defines filing as receipt by the agency clerk during normal business hours. In his pro-se brief, Mr. Sundwall relies on the January 20 date of his signatures and the January 23 postmark date, arguing that he is entitled to the benefit of the prison mailbox rule under Haag v. State, 591 So. 2d 614 (Fla. 1992). FWC does not dispute that argument, but argues that Mr. Sundwall provided no proof that he placed his papers in the hands of prison officials before expiration of the deadline; i.e., no institutional mail stamp or log and no certificate of service. The record does not reflect whether Mr. Sundwall’s institution utilizes dated mail stamps or logs, but one reason there were no certificates of service is because none of the forms that FWC supplied to him contained a certificate of service. In a literal sense, however, Mr. Sundwall "provided" FWC a postmarked envelope that evidences timeliness. He argues on appeal that FWC calculated the time erroneously, and he points out that the envelope was postmarked on January 23. The postmark date was before expiration of the twenty-one-day period for requesting a hearing, and therefore the petition necessarily was submitted to prison officials before the deadline. FWC acknowledged the postmark date in its order of dismissal, and the postmarked envelope is in the record. We therefore reverse the order of dismissal and remand for further proceedings on Mr. Sundwall's petition.[4] Ultimate Findings There is no dispute that the Sea Joy was a “vessel” within the meaning of section 327.02(46), Florida Statutes. When it was beached on Wisteria Island, the Sea Joy was a “derelict vessel” within the meaning of section 823.11(1)(b)1. It was left or abandoned in a wrecked, junked, or substantially dismantled condition upon the public waters of this state. While the Sea Joy no longer exists, the photographic evidence and the witness testimony conclusively demonstrate that it was wrecked or substantially dismantled by the time it ran aground on Wisteria Island. The photographic evidence also demonstrated that the Sea Joy was upon the State of Florida’s public waters at high tide. Mr. Sundwall made several factual arguments during the final hearing. For instance, section 823.11(1)(b)3. defines a “derelict vessel” as one that is “[d]ocked, grounded, or beached upon the property of another without the consent of the owner of the property.” Mr. Sundwall testified that he had permission for the Sea Joy to be on Wisteria Island. Mr. Sundwall’s argument is not persuasive because the Commission determined the Sea Joy to be a 4 To whatever extent that Mr. Sundwall is seeking damages from the Commission for the Sea Joy’s destruction, he must pursue that claim before a different tribunal. DOAH’s role in this matter is limited to making findings as to whether the Sea Joy was a “derelict vessel” within the meaning of section 823.11(1)(b)1. and thus subject to sections 376.15(3)(a) and 705.103. derelict vessel pursuant to section 823.11(1)(b)1., not section 823.11(1)(b)3. However, even if the Commission had deemed the Sea Joy to be derelict pursuant to section 823.11(1)(b)3., Mr. Sundwall’s testimony that he had permission to keep the Sea Joy on the shore of Wisteria Island was uncorroborated and unpersuasive. In preparation to take control of the Sea Joy, Mr. Sundwall asserted that a friend of his had attempted to inspect the Sea Joy while it was beached on Wisteria Island. He claimed that the Commission forced Mr. Sundwall’s friend away from the wrecked vessel. Because the Commission was dealing with several hundred displaced vessels in the aftermath of Hurricane Irma, it is very unlikely that the Commission would have been in a position (or to have been inclined) to prevent any willing person from removing the derelict Sea Joy from Wisteria Island or inspecting it. Moreover, the undersigned generally found Mr. Sundwall’s testimony on this point to be unpersuasive and self-serving. Mr. Sundwall’s witnesses did not present any persuasive testimony to corroborate his assertions. Mr. Sundwall also argued that the instant case is part of the Commission’s ongoing effort to retaliate against him for undermining a criminal investigation. Even if that were the case, there is no evidence that the Commission left the Sea Joy anchored off Wisteria Island or caused it to become a derelict vessel. Mr. Sundwall asserts that he has been denied due process. However, the facts refute that assertion because: (a) he was given notice of the Commission’s proposed action to dispose of the Sea Joy; (b) he had an opportunity to request a hearing; (c) his case was referred to DOAH; and (d) a formal administrative hearing was conducted on February 7, 2020, at which he fully participated.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Fish and Wildlife Conservation Commission issue a Final Order deeming the Sea Joy to have been a “derelict vessel” within the meaning of section 823.11(1)(b)1. and that the Commission was authorized under section 376.15(3)(a) to relocate or remove the Sea Joy. DONE AND ENTERED this 1st day of June, 2020, in Tallahassee, Leon County, Florida. S G. W. CHISENHALL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of June, 2020. COPIES FURNISHED: Brandy Elaine Elliott, Esquire Florida Fish & Wildlife Conservation Commission 620 South Meridian Street Tallahassee, Florida 32399 (eServed) Jeffrey Ray Sundwall, 829113 Jackson Correctional Institution 5563 10th Street Malone, Florida 32445 Eric Sutton, Executive Director Florida Fish and Wildlife Conservation Commission Farris Bryant Building 620 South Meridian Street Tallahassee, Florida 32399-1600 (eServed) Emily Norton, General Counsel Florida Fish and Wildlife Conservation Commission Farris Bryant Building 620 South Meridian Street Tallahassee, Florida 32399-1600 (eServed)

Florida Laws (6) 120.569120.57327.02376.15705.103823.11 Florida Administrative Code (1) 28-106.104 DOAH Case (1) 19-4039
# 6
DEPARTMENT OF BANKING AND FINANCE vs. FLORIDA SEAFOOD BROKERS, INC., AND JERRY RUSSELL OGLE, 86-003945 (1986)
Division of Administrative Hearings, Florida Number: 86-003945 Latest Update: Mar. 31, 1987

The Issue Whether the equipment purchase and lease agreement to which Paul Richards and Florida Seafood Centers, Inc., became parties is an "investment contract" and so a security, within the meaning of Section 517.021, Florida Statutes (1985)? If so, whether it was exempt from registration requirements under Section 517.061(11)(a), Florida Statutes (1985)? If not, whether respondent Ogle solicited an offer, or offered or attempted to dispose of any interest in the agreement for value?

Findings Of Fact William Carl Webster had an idea, but no money. In fact, the business he and his wife owned, Cap'n Carl's Seafood Company, was in bankruptcy. No stranger to the seafood business, wholesale or retail, he had been involved for some twelve years. He came to believe he could profit by adopting a technique he noticed purveyors of pizza and milk used: the "impulse freezer," a topless display freezer rolled into the middle of a grocery store aisle to attract customers' attention. The "concept" was to sell frozen seafood wholesale to licensed food retailers. Webster believed it would be a simple matter of establishing the accounts, installing the freezers, and arranging with a reputable Tampa Bay fish house to deliver "custom packed" seafood. Overhead would be minimal, or so Mr. Webster told Barry Louis Harris, with whom he had played baseball in high school, and from whom he borrowed three thousand dollars for the new venture. None of this money was left by the time Mr. Webster dropped in on Jerry Russell Ogle, an account executive in the Fort Walton Beach office of A. G. Edwards & Sons, Inc., to discuss the ins and outs of going public, in late April of 1984. Mr. Ogle recommended against going public but expressed a willingness to help for a fee. Both Florida Seafood Centers, Inc., and Florida Seafood Brokers, Inc., came into existence on April 24, 1984. Articles of incorporation drawn by Messrs Webster and Harris, with the help of a kit, were filed that day. Jerry Ogle is registered with petitioner as a securities dealer. One of Mr. Ogle's customers, Paul Richards, had been a builder and developer before he moved to Florida from Ohio. As he sold properties in Ohio, he deposited the proceeds in his account at the Fort Walton Beach office of A. G. Edwards & Son. Since Mr. Richards had expressed an interest in investing in a small business, Mr. Ogle thought some of this money might be available for the enterprise on which Messrs Webster and Harris had embarked. Before taking Mr. Richards to lunch at the Harborlight, Mr. Ogle sought and obtained the oral approval of the A. G. Edwards' branch manager to work as a "marketing consultant" for Florida Seafood Centers, Inc. At lunch, he mentioned Florida Seafood Centers, Inc., and gave a "capsule form" account of the business to Mr. Richards. Mr. Richards expressed interest, and Mr. Ogle arranged a second luncheon meeting a week or two later. Messrs Richards, Webster, Harris and Ogle gathered in Mr. Ogle's office, before setting out for lunch at the High Tide. Mr. Ogle told Mr. Richards he thought that Mr. Webster's idea was a good one, but it was Mr. Webster who presented the idea in detail. Although remarking that he might be "digging a hole and throwing money into it," Mr. Richards decided to purchase 25 freezers from Florida Seafood Centers, Inc. On May 23, 1984, he signed an equipment purchase and lease agreement, but negotiations continued and the final agreement was executed on May 24, 1984, in Mr. Ogle's office. At this meeting, Mr. Richards drew a check for $10,000.00 on his A. G. Edwards & Sons, Inc. Total Assets Account, Mr. Ogle witnessed the equipment lease agreement Messrs Richards and Webster signed, and Mr. Ogle wrote, at the bottom of the agreement, "Rec'd $10,000 5-24-84 JRO." Respondent's Exhibit No. 1 Under the equipment purchase and lease agreement, Mr. Richards purchased freezers to lease to Florida Seafood Centers, Inc. In exchange, he was to receive "one half of the net profit of [each] freezer . . . not [to] exceed $800.00 per month for each freezer." Respondent's Exhibit No. 1. As per Ogle's suggestion, he was also to get "1 percent of gross sales revenue of Florida Seafood Centers," Id., all payments to begin after a 180-day "grace period." Mr. Richards' only obligation under the parties' agreement was to pay $1,500.00 for each freezer, or $37,500.00 in all. He had the option to choose among available locations, but had no responsibilities for installation or operation of the freezers or for the sale of seafood. His role was that of a passive investor. Mr. Richards was the only person in Florida who invested in this way, although two of the Alabamians who invested also had houses in Florida. Mr. Richards understood he was the initial investor, but knew others would be approached. The equipment purchase and lease agreement was never registered as a security. Mr. Harris took Mr. Richards' $10,000.00 check to a Barnett Bank branch and opened a bank account for Florida Seafood Centers, Inc., by depositing the check less $2,000.00 cash the bank disbursed and Mr. Webster took to cover expenses already incurred. The first check drawn on Florida Seafood Centers, Inc.'s first bank account was for $500.00 in favor of Mr. Ogle, dated May 28, 1984. Mr. Ogle had told Mr. Webster he expected to be paid for his time and Mr. Webster had agreed, before Mr. Richards signed the equipment lease agreement, to pay Mr. Ogle something if he was ever in a position to do so. At the hearing, they testified the payments to Mr. Ogle - $2,000 in cash from the proceeds of Mr. Richards' second and final check to Florida Seafood Brokers, Inc., dated June 4, 1984, in addition to the $500 check - were for his services as a "marketing consultant." Mr. Ogle never told Mr. Richards he had any sort of agreement with Florida Seafood Brokers, Inc. or Mr. Webster, and Mr. Richards was aware of none before investing in the enterprise. Mr. Ogle did know that bankruptcy had befallen Cap'n Carl's Seafood Company. Mr. Richards never received any payments or sales reports. Some freezers were placed in Piggly Wiggly stores in Birmingham, among other places, without, however, Mr. Richards' advice or assistance, as far as the record shows. Such sales of fish as Messrs Webster and Harris made were in amounts too small to make deliveries of custom-packed seafood economic, so they were obliged to repack the seafood themselves, which entailed renting space and bringing it up to health department standards, all at considerable, unanticipated expense. Eventually the business failed.

Florida Laws (3) 517.021517.061517.07
# 7
MARK SMITHERS vs THE MG HERRING GROUP, INC., 17-005069 (2017)
Division of Administrative Hearings, Florida Filed:Gainesville, Florida Sep. 15, 2017 Number: 17-005069 Latest Update: Jul. 20, 2018

The Issue Whether Respondent, The MG Herring Group, Inc. (MG Herring), was an employer of Petitioners.

Findings Of Fact Xencom provides general maintenance, landscaping, housekeeping, and office cleaning services to retail facilities. In September of 2015, Xencom entered three contracts for services with CREFII Market Street Holdings, LLC (CREFII). The contracts were to provide maintenance, landscaping, and office cleaning services for a mall known as Market Street @ Heathbrook (Market Street) in Ocala, Florida. Michael Ponds, Xencom’s president, executed the contracts on behalf of Xencom. Two individuals executed the contracts on behalf of CREFII. One was Gar Herring, identified as Manager for Herring Ocala, LLC. The other was Bernard E. McAuley, identified as Manager of Tricom Market Street at Heathbrook, LLC. MG Herring was not a party or signatory to the contracts. MG Herring does not own or operate Market Street. A separate entity, The MG Herring Property Group, LLC (Property Group) operated Market Street. The contracts, in terms stated in an exhibit to them, established a fixed price for the year’s work, stated the scope of services, and detailed payment terms. They also identified labor and labor-related costs in detail that included identifying the Xencom employees involved, their compensation, and their weekly number of hours. The contract exhibits also identified operating costs, including equipment amortization, equipment repairs, fuel expenses, vacation costs, health insurance, and storage costs. The contracts ended December 31, 2016. The contracts specify that Xencom is an independent contractor. Each states: “Contractor is an independent contractor and not an employee or agent of the owner. Accordingly, neither Contractor nor any of Contractor’s Representatives shall hold themselves out as, or claim to be acting in the capacity of, an agent or employee of Owner.” The contracts also specify that the property manager may terminate the contract at any time without reason for its convenience. The contracts permit Xencom to engage subcontractors with advance approval of the property manager. They broadly describe the services that Xencom is to provide. Xencom has over 80 such contracts with different facilities. As the contracts contemplate, only Xencom exerted direct control of the Petitioners working at Market Street. Property Group could identify tasks and repairs to be done. Xencom decided who would do them and how. In 2013, Xencom hired Michael Harrison to work as its Operations Manager at Market Street. He was charged with providing services for which Property Group contracted. His immediate supervisor was Xencom’s Regional Manager. In 2016, that was David Snell. Mr. Snell was not located at Market Street. Property Group also did not have a representative on site. Before Xencom hired him, Mr. Harrison worked at Market Street for Property Group. Xencom hired the remaining Petitioners to work at Market Street under Mr. Harrison’s supervision. Each of the Petitioners completed an Application for Employment with Xencom. The application included a statement, initialed by each Petitioner, stating, “Further, I understand and agree that my employment is for no definite period and I may be terminated at any time without previous notice.” All of the Petitioners also received Xencom’s employee handbook. As Xencom’s Operations Manager and supervisor of the other Petitioners, Mr. Harrison was responsible for day-to-day management of Petitioners. He scheduled their work tasks, controlled shifts, established work hours, and assigned tasks. Mr. Harrison also decided when Petitioners took vacations and time off. His supervisor expected him to consult with Property Group to ensure it knew what support would be available and that he knew of any upcoming events or other considerations that should be taken into account in his decisions. As Operations Manager, Mr. Harrison was also responsible for facilitating payroll, procuring supplies, and managing Xencom’s equipment at the site. Xencom provided Petitioners work uniforms that bore Xencom’s name. Xencom required Petitioners to wear the uniforms at work. Xencom provided the supplies and equipment that Petitioners used at work. Only Xencom had authority to hire or fire the employees providing services to fulfill its contracts with the property manager. Only Xencom had authority to modify Petitioners’ conditions of employment. Neither MG Herring, Property Group, nor Xencom held out Petitioners as employees of MG Herring or Property Group. There is no evidence that MG Herring or Property Group employed 15 or more people. Property Group hired Tina Wilson as Market Street’s on- site General Manager on February 1, 2016. Until then there was no Property Group representative at the site. The absence of a Property Group representative on-site left Mr. Harrison with little oversight or accountability under the Xencom contracts for Market Street. His primary Property Group contact was General Manager Norine Bowen, who was not located at the property. Ms. Wilson’s duties included community relations, public relations, marketing, leasing, litigation, tenant coordination, lease management, construction management, and contract management. She managed approximately 40 contracts at Market Street, including Xencom’s three service agreements. Ms. Wilson was responsible for making sure the contracts were properly executed. Managing the Xencom contracts consumed less than 50 percent of Ms. Wilson’s time. During the last weeks of 2016, Mr. Harrison intended to reduce the hours of Kylie Smithers. Ms. Wilson requested that, since Ms. Smithers was to be paid under the contract for full- time work, Ms. Smithers assist her with office work such as filing and making calls. Mr. Harrison agreed and scheduled Ms. Smithers to do the work. This arrangement was limited and temporary. It does not indicate Property Group control over Xencom employees. Ms. Wilson was Xencom’s point of contact with Property Group. She and Mr. Harrison had to interact frequently. Ms. Wilson had limited contact with the other Xencom employees at Market Street. Friction and disagreements arose quickly between Mr. Harrison and Ms. Wilson. They may have been caused by having a property manager representative on-site after Mr. Harrison’s years as either the manager representative himself or as Xencom supervisor without a property manager on-site. They may have been caused by personality differences between the two. They may have been caused by the alleged sexual and crude comments that underlie the claims of discrimination in employment. They may have been caused by a combination of the three factors. On November 21, 2016, Norine Bowen received an email from the address xencomempoyees@gmail.com with the subject of “Open your eyes about Market Street.” It advised that some employees worked at night for an event. It said that Ms. Wilson gave the Xencom employees alcohol to drink while they were still on the clock. The email said that there was a fight among Xencom employees. The email also said that at another event at a restaurant where Xencom employees were drinking, Ms. Wilson gave Ms. Smithers margaritas to drink and that Ms. Smithers was underage. The email claimed that during a tree-lighting event Ms. Wilson started drinking around 3:30 p.m. It also stated that Ms. Wilson offered a Xencom employee a drink. The email went on to say that children from an elementary school and their parents were present and that Ms. Wilson was “three sheets to the wind.” The email concludes stating that Ms. Wilson had been the subject of three employee lawsuits. On December 14, 2016, Ms. Wilson, Ms. Bowen, and Mr. Snell met at Property Group’s office in Market Street for their regular monthly meeting to discuss operations at Market Street. Their discussion covered a number of management issues including a Xencom employee’s failure to show up before 8:00 to clean as arranged, security cameras, tenants who had not paid rent, lease questions, HVAC questions, and rats on the roof. They also discussed the email’s allegations. The participants also discussed a number of dissatisfactions with Mr. Harrison’s performance. Near the end of a discussion about the anonymous email, this exchange occurred:2/ Bowen: Okay, so I know that David [Snell], I think his next step is to conduct his own investigation with his [Xencom] people, and HR is still following up with John Garrett, and you’re meeting with Danny [intended new Xencom manager for Market Street] tonight? David Snell: Yes. Bowen: To finish up paperwork, and, based on his investigation, it will be up to Xencom to figure out what to do with people that are drinking on property, off the clock or on the clock, you know, whatever, what their policy is. * * * Bowen: So, I don’t know what to make of it. I’m just here to do an investigation like I’m supposed to do and David is here to pick up the pieces and meet with his folks one-on- one, and we’ll see where this takes us. This exchange and the remainder of the recording do not support a finding that Property Group controlled Xencom’s actions or attempted to control them. The participants were responsibly discussing a serious complaint they had received, their plan to investigate it, and pre-existing issues with Mr. Harrison. The exchange also makes clear that all agreed the issues involving Xencom employees were for Xencom to address, and the issues involving Property Group employees were for Property Group to address. At the time of the December 14, 2016, meeting, the participants were not aware of any complaints from Mr. Harrison or Mr. Smithers of sexual harassment or discrimination by Ms. Wilson. On December 15, 2016, Gar Herring and Norine Bowen received an email from Mr. Harrison with an attached letter to Xencom’s Human Resources Manager, and others. Affidavits from Petitioners asserting various statements and questions by Ms. Wilson about Mr. Harrison’s and Mr. Smithers’ sex life and men’s genitalia and statements about her sex life and the genitalia of men involved were attached. Xencom President Michael Ponds received a similar email with attachments on the same day. On December 21, 2016, Mr. Ponds received a letter from Herring Ocala, LLC, and Tricom Market Street at Heathbrook, LLC, terminating the service agreements. Their agreements with Xencom were going to expire December 31, 2016. They had been negotiating successor agreements. However, they had not executed any. Xencom terminated Petitioners’ employment on December 21, 2016. Xencom no longer needed Petitioners’ services once MG Herring terminated the contract with Xencom. This was the sole reason it terminated Petitioners.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Commission on Human Relations enter a final order denying the Petitions of all Petitioners. DONE AND ENTERED this 11th day of May, 2018, in Tallahassee, Leon County, Florida. S JOHN D. C. NEWTON, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 11th day of May, 2018.

Florida Laws (4) 120.569120.57760.02760.10
# 8
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs JACK V. ORGANO, 11-000244PL (2011)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Jan. 14, 2011 Number: 11-000244PL Latest Update: Nov. 12, 2019

The Issue The issues in these cases are whether Respondent violated sections 489.129(1)(i), 489.129(1)(o), and 489.1425, Florida Statutes (2007 & 2009),1/ and, if so, what discipline should be imposed.

Findings Of Fact At all times material to the administrative complaints, Mr. Organo was licensed as a certified general contractor in the State of Florida, having been issued license number CGC 1512005. At all times material to the administrative complaints, Mr. Organo was the primary qualifying agent for Bennett Marine Contracting and Construction, Inc. (Bennett Marine). On or about September 29, 2007, Jean Walker (Ms. Walker) entered into a contract with Bennett Marine to construct a dock and a tiki hut at 12305 Boat Shell Drive. The contract (the Walker contract) provided that the contractor would make application for a permit from Lee County, Florida. Mr. Organo signed the Walker contract for Bennett Marine. It is undisputed that the Walker contract did not include a written statement explaining Ms. Walker's rights under the Florida Homeowners' Construction Recovery Fund. On October 24, 2007, Bennett Marine applied for a permit to construct the dock. The application was denied October 29, 2007, because the site plan contained the tiki hut. When the tiki hut was removed from the application, the dock permit was approved. Ms. Walker paid Bennett Marine draws on the construction project. The payments were given to Mr. Organo. The payments totaled $9,200. By February 2008, a tiki hut had been constructed on Ms. Walker's property without a permit. Because the tiki hut was built without a permit, and it was in an illegal location, Lee County required that the tiki hut be removed. By April 2008, the tiki hut had been removed, and another tiki hut had been built in its place. Again, no permit was pulled for the tiki hut, and it was placed in an illegal location. Again, Lee County required that the tiki hut be removed. Mr. Organo subcontracted the construction of the tiki hut to Rick Fewell Chickees. Mr. Fewell of Rick Fewell Chickees, a Seminole Indian,2/ applied for a permit to build a tiki hut, but the application was rejected because the plot plan was not to scale, and the tiki hut did not meet the setback requirements from the water. Another tiki hut was built, and, in March 2009, Lee County again cited Ms. Walker for not having a permit for the tiki hut and for not meeting the setback requirements. In 2010, a permit was finally issued for the construction of a tiki hut on Ms. Walker's property. The permit was issued to Ms. Walker. Bennett Marine commenced work on the tiki hut without obtaining a building permit. On January 5, 2010, Bennett Marine entered into a contract with Chris Bevan (Mr. Bevan) to remove an existing dock, uninstall an existing boatlift, construct a dock, construct a tiki hut, and to reinstall the boatlift. The contract (the Bevan contract) required that the contractor obtain a City of Cape Coral building permit. The Bevan contract was signed by Mr. Organo for Bennett Marine. It is undisputed that the Bevan contract did not contain a written statement explaining Mr. Bevan's rights under the Florida Homeowners' Construction Recovery Fund. On March 17, 2010, Bennett Marine showed up on Mr. Bevan's property and commenced work, by knocking down a cantilever dock that was hanging over a seawall, removing old decking from the boatlift, and rough-framing part of the new dock. Bennett Marine worked until approximately March 25, 2010. That was the last that Mr. Bevan heard from Mr. Organo or Bennett Marine. Mr. Organo applied for a building permit for the Bevan contract on April 1, 2010. The permit was approved on April 13, 2010, but it was not issued. On May 14, 2010, the City of Cape Coral placed a stop-work order on the Bevan project. Mr. Bevan applied for an owner-builder permit for the dock construction, and the permit was issued on June 9, 2010. Mr. Bevan completed the dock construction at additional expense.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding that Mr. Organo violated sections 489.129(1)(i), 489.129(o), and 489.1425; imposing a fine of $250 each for the Walker contract and the Bevan contract for a total of $500, for failure to advise the owners of the recovery fund; imposing a fine of $3,000 and placing Mr. Organo on probation for two years for beginning work without a permit for the Walker contract; and imposing a fine of $1,000 and placing Mr. Organo on probation for one year for beginning work on the Bevan contract without a permit with the one-year probation to run concurrently with the probation imposed for the Walker contract. DONE AND ENTERED this 13th day of April, 2011, in Tallahassee, Leon County, Florida. S SUSAN B. HARRELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of April, 2011.

Florida Laws (5) 120.569120.57489.1195489.129489.1425
# 9
JIM AND NANCY BUNTIN, PENELOPE AND PAUL STOVALL vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-001086 (2008)
Division of Administrative Hearings, Florida Filed:Santa Rosa Beach, Florida Feb. 29, 2008 Number: 08-001086 Latest Update: Feb. 19, 2010

The Issue Whether the Buntins and the Stovalls should receive an after-the-fact coastal construction control line (CCCL) permit to allow a sand-filled HESCO Basket System constructed in the aftermath of Hurricane Dennis in 2005 and that is now primarily a vegetated dune to remain as a permanent structure in Walton County?

Findings Of Fact Sea Turtle Nesting Habitat on a Hurricane-battered Coast Along the northernmost reaches of the Gulf of Mexico, roughly in the center of the Florida Panhandle coast, the beaches and shores of Walton County have been subject to the many vicissitudes of coastal climate over the years. So have marine turtles, several species of which have relied through the ages on Florida beaches and shores, including those in Walton County for nesting habitat. Survivors of shifting circumstances brought by weather, sea turtles are now imperiled by exposure to man-made dangers. Anthropogenic turtle hazards on populated beaches are numerous and, without educational efforts of the Department and the Commission, not likely to be recognized by beach-goers interested in the enjoyment of surf and sun. Folding beach chairs and canopies, board walks designed to protect the dune system, and other seemingly-harmless by- products of human beach activity, even holes dug by children building sand castles, can contribute to sea turtle injury and cause sea turtle fatality. While sea turtles in recent times have made their way across the Walton County beach toward their nests through obstacles set up by human beings and hatchlings have scurried toward the sea through these same impediments, owners of beachfront property have had to contend with powerful tropical storms, particularly in the relatively recent past. Especially damaging to property along the Walton County Coastline have been three hurricanes that hit in the span of a decade: Opal in 1995, Ivan in 2004 and Dennis in 2005. The intense storm surge of Hurricane Opal destroyed much of the dune system along the stretch of Seagrove Beach in Walton County that is the subject of the aerial photography introduced into evidence in this case. Ivan, which made landfall just west of Gulf Shores, Alabama, as a Category 3 Hurricane on September 16, 2004, caused heavy damage to the Walton County coastline and areas west. Of the three, though, the damage done by Dennis is the sine qua non of this proceeding brought by Petitioners to preserve and protect their property. The Stovall and Buntin Property When Hurricane Dennis hit, the Stovalls had owned the property located at 711 Eastern Lake Road, Santa Rosa Beach, Walton County, for some time. Purchased by both Mr. and Mrs. Stovall and in both their names at the time the petition was filed, by the time of hearing, the property had been transferred into Mrs. Stovall's name only. The Stovalls bought the lot around 1997 give or take a year. "[T]he house itself is about 11 years old," tr. 17, built in 1998 or thereabouts. Seaward of the CCCL established on December 29, 1982, construction of the house required a CCCL permit from the Department. In the words of Mr. Stovall, the permitting process required "hundreds of hoops to jump through." Tr. 18. The lot had been in foreclosure and the permit was obtained through the services of a reputable architectural firm. The house, therefore, was designed and constructed to survive a major hurricane, a requirement of the permit. The house was built on pilings sturdy enough to support the house in the event of a major hurricane. High enough to allow the bottom floor of the house to be above storm surge, the pilings' height and house elevation also allowed ample parking for vehicles beneath the house. At the time the Stovall house was built, despite the damage done by Opal, there remained a good natural dune system seaward of the house, one that was "beautiful . . . wonderful," tr. 19, in the words of Mr. Stovall. After the house was constructed, Mrs. Stovall took particular pleasure in the dune system and worked to preserve and cultivate sea oats in its support. She also was thrilled by the presence of two turtle nests not long after the purchase of the lot, one nest found in 1998 and the other discovered on July 22, 1999. After the discoveries, Sharon Maxwell, the County- authorized "local turtle coordinator," tr. 295, and "the only person in the County permitted to touch . . . turtles," tr. 296 was contacted. Ms. Maxwell measured the nests from points related to the Stovall house. They were at least 20 feet seaward of the toe of the most seaward dune. Because the nests were on a busy stretch of the beach, protective measures were implemented. Among the protective measures were actions by Mrs. Stovall. In addition to working with the local turtle coordinator, Mrs. Stovall became involved in circulation of information to neighbors about sea turtle conservation. She was part of an effort to encourage the information to be placed in rental units in the neighborhood. The information recommended turning out lights on the beach that interfered with turtle nesting, "brought out the importance of a single . . . beach chair [that] can misdirect and kill over hundreds of endangered hatchlings . . . [and] umbrellas . . . left overnight [that] can interfere with nesting." Tr. 293. She called local government commissioners and attended commission meetings where she advocated beach removal of items hazardous to sea turtles, their nests and their offspring. Her efforts have extended off-shore as well. As a scuba diver, she learned how to respect sea turtles and their marine habitat and "encouraged others to stay away and not harass the turtles, which many divers do." Tr. 195. The Buntin property, located at 701 Eastern Lake Drive, is adjacent to the Stovall property on the east side. Owned by the Buntins since 1990, the house on the lot was built in 1991 or early 1992. Like the Stovall house, the Buntin house is seaward of the CCCL and built to withstand the forces of major tropical storms. The Buntins, similar to the Stovalls, care about the beaches and shores of Walton County and particularly the beach adjacent to their property. Their intent with regard to the coastal environment is to protect it. There have been times over the past two decades when the Buntins greatly enjoyed their property. Their relationship to it, however, has changed. As Mr. Buntin put it at hearing, "[I]t's a situation we put ourselves in [but] I wish we didn't have any beach property. And I imagine there's a lot of other folks that wish that, too,. . ." Tr. 54. A major factor in Mr. Buntin's change-of-attitude is damage done by Hurricane Dennis. Hurricane Dennis Hurricane Dennis made landfall near Navarre Beach not far west of the Stovall and Buntin Properties on July 10, 2005, having struck the tip of peninsular Florida the day before. Classified according to the Saffir-Simpson Scale as a Category 4 Hurricane at moments in its journey through the Caribbean and the Gulf of Mexico, it came ashore in the northern Gulf as a Category 3 hurricane. Some of the worst damage it caused was along the panhandle coast. One of its damaging effects was enormous erosion of the beaches and shores along the coastline where the Stovall and Buntin property is located. That stretch of beach remains classified as a "critically eroding beach." After the storm, there was nothing left of the dunes seaward of the Stovall and Buntin houses. The Stovall house, itself, was not structurally damaged; there was not "a crack in the Sheetrock. The house stood solid." Tr. 30. It had lost its bottom deck and the deck on its western side but true to the CCCL permitting criteria, the house, perched on pilings about the storm surge, had also withstood the Category 3 force winds of the hurricane. Dennis had caused more damage to the property, however, than just the loss of a few decks. It had eroded the beach as far up as landward of the Stovall's house. At hearing, Mr. Stovall described his first view of the property post-Dennis: [T]he water was lapping back . . . behind the house. And if anybody walked up to where it was, it would just cave in. I fully believed that if that storm would've gone on another two hours, it would have been in the man's house behind me[.] . . . [W]e had no access to the front door and one of the neighbors down the street brought in a ladder . . . It would have taken a 20 or 21-foot ladder to have gotten up to [the] first deck level . . . . Tr. 25. Without a ladder, the house was not accessible. Most pertinent to the Stovall's persistence in bringing this proceeding, there was nowhere to park their vehicles. The parking area under the house had been scoured out. The Buntin property likewise suffered the impact of the hurricane's scour. Mr. Buntin was contacted by a neighbor and told that the scouring under his house was so bad that the air-conditioners midway between the seaward and landward sides of the house were "hanging over a 20-foot drop-off." Tr. 45. Mr. Buntin did not give the report much credibility at first but, to his dismay, found it true when he visited the property shortly after the storm. Just as in the case of the Stovall property, a car could not be parked under the house in the space that had served as the parking area prior to Dennis. Half of a car could be parked under the house but the rest of the sand- based parking area was gone. In its place was a steep embankment that "dropped off 20 feet." Tr. 46. A Serious Parking Problem Eastern Lake Road runs roughly east-west just north of the Stovall and Buntin properties. The roadbed lies in a roadway and utility easement. Because of the easement, property owners along the roadway are not allowed to use it for permanent parking. The restriction includes the entire right-of-way that extends beyond the roadbed. As a combination of the easement and the parking restriction, under-story parking is the only permanent parking place that can serve the properties. Aware that their properties were seaward of the CCCL, the Stovalls and Buntins sought guidance as to how to re- establish parking for their beach front property. They turned both to local government and to DEP. DEP's Emergency Order On the same day that Hurricane Dennis hit South Florida (the day before it made landfall on the panhandle coast), the Department issued an Emergency Final Order (the "Emergency Final Order." Styled, In re: EMERGENCY AUTHORIZATION FOR REPAIRS, REPLACEMENT, RESTORATION AND CERTAIN OTHER MEASURES MADE NECESSARY BY HURRICANE DENNIS and dated July 9, 2005, the Emergency Final Order followed a declaration by Governor Jeb Bush of a state-wide emergency. By State of Florida Executive Order No. 05- 139, the Governor declared that a state of emergency exists throughout the State of Florida, based upon the serious threat to the public health, safety and welfare posed by the Hurricane. Department Exhibit 9, paragraph 2., at 1. The Department's Emergency Order, therefore, had state-wide application and applied to Walton County even though Dennis had not yet come ashore onto the panhandle coast. The Final Emergency Order made the following findings: The Department finds that the Hurricane has created a state of emergency threatening the public health, safety, welfare and property throughout the Emergency Area. As a result of the emergency, immediate action by Florida's citizens and government is necessary to repair, replace, and restore structures, equipment, surface water management systems, works, and operations damaged by the Hurricane. The Department finds that an emergency authorization is required to address the need for immediate action because the normal procedures for obtaining the necessary authorizations would not result in sufficiently timely action to address the emergency. The Department finds that immediate, strict compliance with the provisions of the statutes, rules, or orders noted within this Order would prevent, hinder, or delay necessary action in coping with the emergency, and that the actions authorized under this order are narrowly tailored to address the immediate need for action and are procedurally fair under the circumstances. Department Exhibit 9, at 2. With regard to "Coastal Construction Control Line Activities," Section 3., of the order was clear. It did not "authorize the construction of structures that did not exist prior to the emergency . . . ." Id. at 17. The Final Emergency Order contained a provision, however, that may have related directly to the predicament of the Stovalls and the Buntins. Paragraph 3.b., entitled "Activities Requiring Local Authorization," opens with an introductory statement with regard to certain activities and then lists those activities as follows: Local governments are authorized to issue permits in lieu of Department permits to private and public property owners for the activities listed below. * * * (4) Return of sand to the beach dune system which has been deposited upland by the Hurricanes. Id. (emphasis added). The activity of returning sand to the beach dune system is subject to a section of the Final Emergency Order dedicated to "General Conditions." Id. at paragraph 4., pp. 20- In addition to the requirement that the activities "be performed using appropriate best management practices" id. at 20, in accord with the Florida Land Development Manual, the General Conditions section contained explicit provisions with regard to sea turtles: The nature, timing, and sequence of construction activities authorized under this Order shall be conducted in such a manner as to provide protection to, and so as to not disturb . . . listed species and their habitat, including threatened or endangered sea turtles If activities under C.3 of this Order occur during the marine turtle nesting season (March 1 through October 31 in Brevard and Broward County, May 1 in all other coastal counties), such activities must be coordinated with the Florida Fish and Wildlife Conservation Commission's Imperiled Species Management Section to ensure that all activities comply with state and federal requirements for the protection of seat turtles, their nests, hatchlings, and nesting habitat. Nothing in this order authorizes the taking, attempted taking, pursuing, harassing, capturing or killing of any species (or the nests or eggs of any species) listed under Rule 68A-27 of the Florida Administrative Code or under the Federal Endangered Species Act. Id. at 21-22. Under Section D., "GENERAL PROVISIONS," of the Emergency Final Order, the order cautioned, "[u]nder no circumstances shall anything contained in this Order be construed to authorize the repair, replacement, or reconstruction of any type of unauthorized or illegal structure, habitable or otherwise." Id. at 27, 28. The Emergency Final Order declared its effectiveness for 60 days following its execution on July 9, 2005, by the Secretary of the Department. Expressly set to expire on September 7, 2005, therefore, it promised in the meantime, "to act on requests for field authorizations in a timely and expeditious manner." Id. at 28. The Field Permit True to its word, the Department issued a field permit to Mr. Stovall on August 16, 2005. See Department Exhibit 10. The project is described in the field permit as repair and replacement of wooden decks and "repair/replace understructure concrete/brick paver parking area to original condition." Id. The repairs included electrical, plumbing and HVAC work and replenishment of approximately 1800 yards of sand for foundation pilings. The permit stressed, "[n]o other activity is authorized." Id. And, as part of its special conditions, the permit listed, "all construction shall comply with attached marine turtle conditions." Id. In the attempt to return the understory parking to its original condition, simply replacing sand did not work. "[I]t became pretty obvious to us as we put the sand in there," Mr. Stovall testified at hearing, "the sand was running out." Tr. 31. The Buntins were experiencing much of the same difficulties. Mr. Buntin compared the situation right after the hurricane to four years later at the hearing: There was so much confusion going on . . . we are so far after the fact now [August of 2009]. It's kind of hard to put yourself back in the position we were in at the time [summer of 2005] because there were an awful lot of questions and very few answers. You would get referred . . . this is what the regulations say. Well, you read the regulation and it is left to interpretation . . . the written word is . . . wonderful, but if you've got three people reading it, it's kind of hard to figure out exactly what it means. Now [August of 2009], after the fact . . ., we [have] answers . . . we didn't have at the time. Tr. 51 (emphasis added). Mr. Buntin knew one thing for sure: placing sand under the house would not be enough, "you've got to have some way to keep it underneath . . . because you're going to have to build a parking pad on top of it." Tr. 47. Neither an expert in CCCL regulations nor a coastal engineer, Mr. Buntin had no doubt "[y]ou can't just pile up sand and park the car on sand." Tr. 48. Mr. Buntin knew that in a coastal environment the understory parking would require a base of sand and a means of retaining the sand base under the house. The answer to the quandary was presented by Mike Jones, a contractor hired initially by the Stovalls and eventually by the Buntins, too. Mr. Jones suggested a HESCO Basket System. The HESCO Basket System In the aftermath of the storm, it was difficult to get assistance from repair companies. Mr. Stovall described the difficulty at hearing: "That was a tough job because everybody along the beach had damage, too, and getting someone to even come out there and give you a bid on it was like pulling eye teeth." Tr. 30. Eventually, through his brother, Mr. Stovall learned about Michael Alan Jones ("Mike Jones"), a general contractor licensed in Georgia. Mr. Jones agreed to look at the property. At hearing, he recalled his initial assessment of the Stovall and Buntin repair jobs: [T]here was a crater below the residences. We had to use an extension ladder to gain access to the Stovall property and we had to use some unique engineering to be able to access Mr. Buntin's property. There was no place to park. I noted on the Stovall property that . . . a paver system . . . was used for his parking area and the end of Eastern Lake Road as well, and the majority of that system was either currently . . . in the ocean or was in various stages of disrepair. It was falling apart. It was sagging one foot, 18 inches in many areas. It appeared . . . unsafe. * * * Some of . . . the pressurized [water] lines had been broken. The drain lines that lead into the septic or the county sewer were broken . . . the same on both properties. The air conditioning units were hanging by the power cables [I'd guess] 15 to 20 feet in the air, which, of course, poses a serious threat to anybody that walks . . . underneath them when the cable . . . unhook[s] itself from whatever connector or breaks. I noted at Mr. Stovall's, the whole bottom level of his deck was missing. * * * Mr. Buntin's dune walkover and much of his deck were sagging and unsafe [with] pieces missing. There was no . . . foundation on which to place a vehicle or anything for that matter underneath . . . the houses. I also noted . . . several onlookers . . . were using the area underneath the Stovalls' and Buntins' houses to access the beach, which was, in my opinion, extremely unsafe . . . [because of] falling five pound bricks and air conditioners hanging and wood falling off the side of the house. Tr. 82-83. The "crater" under the houses was not just a parking problem. Before the necessary repairs could be started, the understory had to be shored up. In the meantime, efforts were made to keep "onlookers" from using the area under the houses but they were not completely successful. Every morning that Mr. Jones visited the site at the beginning of his efforts, there was evidence left behind by people under the house the night before. Mr. Jones was of the same opinion as the Stovalls and the Buntins. For replacement of sand to work, there had to be a system for retaining the sand under the house. For several weeks, he conducted research by traveling up and down the beach discussing the issue with other contractors. Ultimately, Mr. Jones reached the conclusion that "the least invasive, most efficient . . . , environmentally friendly" system was a HESCO Basket System. HESCO Baskets HESCO Baskets are wire-framed open cell structures. One cell consists of four flat panels of wires of the same gauge. The "top" of the cell or basket is completely open as is the "bottom." Each of the four sides consist of horizontal wire rods spaced equally apart and welded to four similar-sized rods in a vertical position to form a panel of squares framed by the rods but which are mostly open space. The fours sides are bound together by a coil of wire of a gauge identical to the wire used in the rest of the structure. Attached to the sides on the inside of the cells is felt-like material that is water- permeable. Two baskets are created by joining three wire panels to an existing basket. Only seven panels, therefore, are needed to create two baskets since one of the panels is shared. Used in military applications to create revetment structures to protect aircraft and personnel and in river settings for flood control in places as diverse as Alaska and the Middle East, HESCO baskets also have commercial applications. These were investigated by Mr. Jones as he talked to other contractors in the area. Ultimately, he viewed the process of installation of HESCO baskets locally, obtained a list of installers from a HESCO basket distributor and picked Robert Klemen, an installer who worked in the area of the Stovall and Buntin properties to hire as a subcontractor under his supervision. Before installation, however, a permit was required. Under the DEP Final Emergency Order authorizing local governments to issue permits for temporary emergency protection seaward of the CCCL, separate permits for the Stovall and Buntin properties were issued by Walton County. The Walton County Permits On October 28, 2005, Billy Bearden, Building Official for Walton County, issued two building permits to Robert Klemen. The first, Permit No. SW398Dennis, (the "County Stovall Permit") was for 711 Eastern Lake Dr., the Stovall Property. The second, SW400Dennis, (the "County Buntin Permit") was for 701 Eastern Lake Dr., the Buntin Property. The County Stovall Permit gives Mr. Kleman permission for "TEMP SEAWALL STABLILIZING BASKETS." Department Exhibit 8. Similarly, the County Buntin Permit gives Mr. Kleman permission for "TEMP Stabilizing BASKETS." Each permit recited that "[t]he Florida Department of Environmental Protection in Hurricane Dennis Emergency Final Order 05-1700 is attached," and warned that "[p]ursuant to the FDEP emergency order, care must be taken for the protection of sea turtles, their nests, hatchlings and nesting habitat." Department Exhibit 8, the 7th and 15th pages of fifteen un- numbered pages. The two permits also recited the following: All temporary retaining walls (or other types of beach armoring), permitted as an emergency measure as a result of Hurricane Dennis and Katrina, must be removed within 60 days of completion or applied to be permitted through DEP as a permanent structure. * * * For ease in monitoring and control, Walton County will consider all temporary restraining walls complete no later than October 28, 2005 and therefore must be removed within (sic) 60 days of completion or by December 27, 2005, whichever is sooner (unless complete application made to DEP). Department Exhibit 8 (emphasis added.) Each permit contained a drawing of the permitted activity. The County Stovall Permit drawing depicts a system consisting of three rows of baskets, two on bottom and one on top, that runs for 70 feet seaward of the Stovall House and then in an "L-fashion" 30 feet to the west of the house. The baskets are shown to be 3 feet wide each so that the bottom row is 6 feet wide. The height of each basket is depicted as 4 feet so that the height of the structure would be 8 feet. The drawing is consistent with the representation at hearing that each basket within the vegetated dune the structure now supports is 3 feet by 3 feet by 4 feet. The drawing also shows a connection to the Buntin system to be installed to the east. The County Buntin Permit shows the same type of structure with three rows of baskets, two on bottom and one on top. The structure extends 60 feet to the east of the Stovall structure seaward of the Buntin house. Prior to construction, it was made clear to Mr. Jones that the "system needed to be as much within the footprint of the house," tr. 93, as possible. The information was communicated from both county representative who conducted inspections and DEP representatives who "were around the property during the process of doing the beach walkovers, as well as the HESCO systems . . .". Id. The HESCO Basket System was not designed to meet coastal armoring standards. Nor was it designed to minimize impacts to sea turtles. Installation Pursuant to the County permits, the Hesco Basket Container Systems were installed on the Stovall and Buntin properties over the course of several weeks. The official CCCL location of the installation is approximately 285 to 399 feet east of DEP's reference monument R-93 in Walton County with a project address of 701 and 711 Eastern Lake Road, Santa Rosa Beach. The purpose of the installation of the man-made structures, consistent with their design, is to assist the retention of sand beneath the understory parking area of the two houses. As depicted on the permit drawings, the Stovall and Buntin systems were unified into one structure, that is, connected so that the structure ran without a break seaward of the Stovall and Buntin houses. During the construction process, Mr. Jones saw and conversed with several DEP representatives who were taking pictures along the beach. Although Mr. Jones "acted firmly in the belief that there would be no problem getting a permanent permit for [the HESCO] structure," tr. 96, he was never told by any DEP representatives, either on site or in phone conversations with Department employees in Tallahassee, that the structure would be permitted permanently by the Department. He was not told that such a permit application would be denied, either, he simply "was never able to get an actual answer . . .". Id. The structure on the Buntin property was constructed as depicted on the permit drawing. There were two rows installed on the bottom and one row on top for a total height of 8 feet. The structure installed on the Stovall property, however, was more elaborate than what was shown on the permit drawing. "[T]he Stovall property has three on the bottom, then two in the middle and then one on the top stacked pyramid style." Tr. 97. Twelve feet tall, the HESCO structure installed on the Stovall property was four feet higher than specified by the County permit. The structures were covered with sand in order to "rebuild the dune," tr. 109, in other words, the HESCO Baskets were installed in such a way as to serve as the core of a restored dune feature. The purpose of the installation was to provide a means of stabilizing the sand under the houses to restore the under-story parking. The installation was complete on November 4, 2005. The sand wall installed by Mr. Jones and his crew was then plugged with sea oats that were watered in the hope that their establishment would encourage the creation of a dune. A Vegetated Dune Pictures introduced into evidence reveal that the HESCO structure installed by the Stovalls and the Buntins, the sand installed on top and around it and the planting of the sea oats has resulted in a well-vegetated dune. As Mrs. Stovall put it at hearing, "y'all have got to admits that's the prettiest set of sea oats y'all [have] ever seen in your lives." Tr. 296. By the time of hearing, the dune had been maintained for nearly four years without any more sand imported by human hands. There has occurred, however, some exposure of wires of the HESCO system. A corner of one of the baskets in front of the Stovall house was exposed at the time of hearing and a picture introduced into evidence showed exposure of the top of several baskets in 2007. Mrs. Stovall expressed a desire to add more sand and ultimately to restore the dune to its pre-Opal status which "would add five-and-a half feet and make [the dune] level with the deck." Tr. 298. No sand has been added since the installation in November of 2005, however, because of the uncertain outcome of this proceeding. The exposure to date of the HESCO Baskets is in all likelihood the result of wind. Wave action, should it reach the system and be strong enough, will cause even more exposure. In fact, the HESCO Basket dune is not likely to be able to withstand wave action from 15 and 25-year return storms and a storms of such strength could expose the entire HESCO Basket structure leaving a jumble and tangle of wires on the beach. A recent series of aerial photographs from 2004 to 2007 show that the dune position to the west of the Buntin/Stovall property is approximately 30-to-50 feet further landward. The dune created by the HESCO baskets, therefore, is more seaward and more interactive with coastal processes than the dune to the west making the HESCO basket dune less likely to survive wave action than the dunes to its west. Nonetheless, as of the time of hearing, the system has maintained its integrity since installation. After the installation, the Stovalls and the Buntins were under no illusion that they had done all that was required in the way of governmental permitting. They knew that the County permits were good for only 60 days. They knew that they needed a CCCL permit from the Department if the structure were to achieve permanent permitting status. For that, they turned to their Qualified Representative in this proceedings, Ong-In Shin. Mr. Shin duly filed a CCCL permit application. The Application and Action by DEP On June 28, 2006, the Department received two applications for permits for construction seaward of the CCCL. Both were filed by Mr. Shin. One was filed on behalf of the Stovalls, the other on behalf of the Buntins. Section 4., of the applications, which called for "[a] brief description of the proposed work, activity or construction," contains the description: "Coastal Armoring." By letter dated July 11, 2006, the Department requested additional information related to the application. Among the eight separate requests was a request for a description of the proposed activity: "Please describe the work done at the subject property for which this After-the-Fact application has been submitted." Department Exhibit 7, at 80. In the notes of the request for additional information there appears the following: Please be advised that structures to be protected must be eligible and vulnerable as per Rule 62B-33.051, F.A.C. * * * Id. at 82. DEP has been notified by the Florid (sic) Fish and Wildlife Conservation Commission that Hesco box structures require an incidental take permit from the U.S. Fish and Wildlife service. The application was deemed incomplete a number of times and specific information was requested for it to be deemed complete. During the course of DEP's correspondence and additional submittals by Mr. Shin on behalf of the Stovalls and the Buntins, the Commission wrote to the Department on May 10, 2007, about its concern with regard to sea turtles. Based on Mr. Shin's representation that HESCO boxes are designed to collapse if subject to wave attack, Robin Trindell, Ph.D., wrote on behalf of the Commission to DEP, "Sea turtles attempting to nest or hatchlings in an area with HESCO containers could become entangled in these collapsible structures. Therefore, we do not recommend that these blocks be installed in sea turtle nesting habitat." Id. at 49. The application was deemed complete on August 30, 2007. On November 28, 2007, the Department issued a notice of denial that was received by Mr. Shin on December 4, 2007. While the HESCO Box System was found to meet applicable siting requirements, it was found to have failed to meet coastal armoring criteria related to eligibility, vulnerability, and design. Furthermore, the Department concluded that "the construction of the HESCO Box Container System does not meet the Department requirements for . . . absence of significant adverse impact to marine turtles." Id. at 9. A December 17, 2008, memorandum from Mr. Shin, received by the Department on December 24, 2007, put DEP on notice of his clients' intent to appeal the denial of the permit. The memorandum requested a 60-day extension of time to research the issues associated with the denial before beginning the "formal appeal process." Id. at 2. Mr. Shin filed the Petition for Formal Administrative Hearing with DEP on February 15, 2008. It initiated this proceeding at DOAH when the Department on February 29, 2008, requested assignment of an administrative law judge to conduct the proceedings. The issues in this case fall under two broad categories: Coastal Armoring and impacts to marine turtles. Coastal Armoring "Armoring" is defined by Florida Administrative Code Rule 59C-33.001(5): "Armoring" is a manmade structure designed to either prevent erosion of the upland property or protect eligible structures from the effects of coastal wave and current action. Armoring includes certain rigid coastal structures such as geotextile bags or tubes, seawalls, revetments, bulkheads, retaining walls, or similar structures but it does not include jetties, groins, or other construction whose purpose is to add sand to the beach and dune system, alter the natural coast currents or stabilize the mouths of inlets. (emphasis added). There is no question that the Stovall/Buntin Hesco Basket System is a manmade structure. Its purpose is to retain the sand under the Stovall and Buntin houses. At the same time, its construction resulted in sand added to the beach and dune system. One thing is clear: the HESCO Basket System is not conventional coastal armoring. Unlike "seawalls, revetments, bulkheads, retaining walls or similar structures" listed in the rule as examples of coastal armoring, the construction of the HESCO System led to a vegetated dune. Coastal armoring is closely regulated under Chapter 161 of the Florida Statutes by the Department and its Bureau of Beaches and Shores because that chapter is "all about protection of the beach dune system." Tr. 337. Coastal armoring usually contravenes such protection. "Coastal armoring does not protect the beach dune system. It's purpose . . . is to protect upland development." Id. While the purpose of the HESCO Basket System is to protect upland development unlike typical coastal armoring, it has added not only sand to the beach but has resulted in the creation and presence of a well-vegetated dune. Prior to 1995, "coastal armoring was only authorized as a last case possibility . . . ." Tr. 337-338. And it was only authorized when approval was given at the highest level of the state executive branch of government, the Governor and Cabinet. But the law was changed in 1995 in recognition that property owners have a right to protect their property. The Coastal Armoring Rule was amended to set up eligibility, vulnerability, siting and design criteria that would strike a reasonable balance between protection of the beach dune system and a property owner's right to protect his or her property. The law was amended again in 2006 to incorporate a new technology for dune restoration: geotextile systems. HESCO Basket Systems use in coastal armoring is also a new technology when it comes to Florida's beaches and shores. Use of HESCO baskets was described at hearing as "very new", tr. 344, relative to the time of the filing of Stovall and Buntin application. If the HESCO Basket System constructed on the Stovall and Buntin properties constitutes "armoring," then it must meet the requirements of Florida Administrative Code Rule 62B-33.051 which govern "Coastal Armoring and Related Structures" (the "Coastal Armoring Rule"). These requirements include conditions related to "eligibility", "vulnerability", and "design," some of the bases upon which the Department's denial of the after-the- fact permit rests. See Fla. Admin. Code R. 62B-33.0051(1)(a) and (2). Mr. McNeal's testimony established that the HESCO Basket System does not meet the "eligibility," "vulnerability," and "design," criteria for coastal armoring. But the Coastal Armoring Rule also encourages applicants for coastal armoring to "be aware that armoring may not be the only option for providing protection." Fla. Admin. Code R. 62B-33.0051(1). To that end, applicants for would-be armoring "are encouraged to evaluate other protection methods . . . such as dune restoration." Id. The HESCO Basket System installed by the Stovalls and Buntins follows the encouragement of the rule: it is a protection method that has resulted in dune restoration. CCCL Permit General Criteria Regardless of whether the HESCO Basket System and the vegetated dune it now supports constitutes coastal armoring, the structure on the Stovall and Buntin property must meet the General Criteria contained in Florida Administrative Code Rule 62B-33.005 for issuance of CCCL permits. Applications for those permits must be denied "for an activity which . . . would result in a significant adverse impact . . .". Fla. Admin. Code R. 62B-33.005(3)(a). Impact assessments conducted by the Department "shall include the anticipated effects of the construction on . . . marine turtles." Id. Marine Turtle Behavior Marine turtles spend most of their lives at sea often foraging hundreds of miles from their nesting habitat. Adult females migrate from feeding grounds and their foraging areas and aggregate off shore beginning in May of nesting season, generally from May through August. Off shore, the female turtles wait for nightfall to swim ashore and crawl landward in search of a spot to nest. Four species of marine turtles typically nest in Walton County: the Loggerhead, the green turtle, the Leatherback and Kemp's Ridley. Because the Loggerhead and green turtle are by far the most prevalent on Walton County beaches, the Commission focused on their specific behavior when it presented the testimony of Dr. Witherington. The mechanics of crawling differ between Loggerhead and green turtles. Loggerheads use an alternating gait while green turtles have simultaneous butterfly-style strokes. Both species drag the plastron or "belly shell" using all four flippers. Their crawls enable them to scale slopes and penetrate dune vegetation but they are not able to crawl backward. They are capable of crawling up a slope that is steeper than one to one. At a location between the recent high water mark, often observable by a wrack line (floating seaweed washed ashore) and the crest of the primary dune, the female selects a spot. The female creates a pit that she can slide her body into it. Loggerheads do so by scraping sand from the front with their front flippers and by gathering sand from beneath at the posterior to push it behind. This behavior referred to as "body pitting" tr. 474, results in a pit that the turtle eases into at a slight angle posterior end-downward at the deepest part of the pit. Green turtles have similar body-pitting behavior but it is more elaborate. "A green turtle will . . . blast the sand out in front of it, dig an enormous pit . . . two or more feet deep and create a very large mound." Tr. 475. Beneath the body pit, the turtle digs an egg chamber. For Loggerheads the depth of the egg chamber is "a little over two feet . . . say 26 inches or so," tr. 482 from the surface of the sand. For a green turtle, the depth is closer to 3 feet. On average, clutch size for a Loggerhead is 115 eggs. The range is from 70-to-170 eggs per clutch. Average clutch size for green turtles in Florida is roughly 128 with a range from 70 to 200. Turtles and the Stovall/Buntin Property Assuming no obstacles such as an exposed HESCO Basket, a sea turtle would have no trouble making its way to the crest of the HESCO Basket dune on the Stovall/Buntin property. The Stovall/Buntin dune supported by HESCO baskets is mostly vegetated with sea oats. There is Seaside Evening Primrose and some Beach Morning Glory, too. As long as the turtles are not interfered with by the HESCO baskets, a sea turtle would have no problem nesting amidst the vegetation on the Stoval/Buntin dune. Heavily eroded beaches do not discourage sea turtle nesting behaviors. But where sea turtles choose to nest on a heavily eroded beach is altered by the erosion. Dr. Witherington explained: [F]ollowing a severe erosion event, . . . [t]he beach tends to be flatter and in some cases broader and with escarpment from erosion that has occurred. And almost invariably following severe erosion events . . ., sea turtles aim for the high ground. In part, because that is the only dry sand remaining on the beach, . . . [a]nd they're choosing the safest sites on the beach to nest. Tr. 485. Thus, the erosion that has occurred on the Stovall/Buntin property is not likely to deter sea turtles from nesting there. Almost all of the area seaward of the Stovall and Buntin houses is nesting habitat, but if a sea turtle chooses to nest there, the most likely place is somewhere on the dune created by the HESCO Baskets. Threats to Sea Turtles Sea turtles encounter numerous threats, impediments and hazards when they are attempting to nest on beaches visited by human beings as much as the beaches of Walton County currently. Coastal armoring is commonly recognized as a threat to sea turtle nesting because it serves as a barrier to sea turtle nesting habitat -- precisely the opposite of the Stovall/Buntin HESCO Basket-supported dune which is an appealing place along a severely eroded beach in which to nest. Man-made debris is a threat to sea turtles. There are numerous types of debris: monofilament line is one example. Holes in the sand dug by beachgoers, beach furniture and walkways are either barriers or can cause entanglement that can lead to sea turtle injury or death. If a turtle gets up on a sea wall and falls, the fall can seriously injure the turtle or result in death. Artificial lighting is a particularly dangerous and prevalent threat. The lighting can disorient both nesting turtle and hatchlings causing them to move away from the ocean or gulf. Death can result from dehydration in the morning sun, wandering inland and falling prey to predators, or ending up on highways and being struck by cars. In addition, there are natural threats to sea turtles. A variety of predators dig into sea turtle nest for the eggs. The eggs may be swept away when the sediment around the clutch is washed away. Inundation, as well, if over too long a period can destroy the eggs. Exposed HESCO baskets are a threat to sea turtles and their hatchling in multiple ways. The ways in which they could injure or kill a turtle were described by Dr. Witherington: HESCO baskets accessible to sea turtles would act as a barrier to a sea turtle reaching an appropriate nesting habitat. An open HESCO basket . . . could act as a trap, . . . [for] turtles that might end up inside the top of the basket itself, and then there's an entanglement effect that would probably be of very little concern for HESCO baskets that were not exposed, but when they do become exposed, the entrapment effect would be much . . . larger . . . Tr. 502. Dr. Witherington also described three problems that could be posed by an exposed HESCO basket shown in a photograph taken on the Stovall property and attached to a Site Inspection Report date November 19, 2007. See Department Exhibit 16P, at 9. These were first, "the pitfall hazard," tr. 504, second, a vertical fall that the turtle might take from atop an exposed basket, and, third, entrapment. As for entrapment, Dr. Witherington opined, "it may look to many that the open HESCO baskets don't leave much opportunit[y] for the sea turtle to become entrapped, but one thing we learned is that sea turtles often make their own traps," id., when presented with situation similar to that of an exposed HESCO basket. There is another hazard to sea turtles posed by a HESCO basket if the baskets were buried beneath where a nesting turtle was digging its nest. If the turtle were to dig into the basket and strike it, it could cause the turtle to abandon the site and return to the sea. If the dune that the HESCO Baskets support were to be washed away in a storm and the basket structure were to fail, the debris left would be a "particularly pernicious tangle of wire and mesh that would very much have the potential to ensnare sea turtles." Tr. 507. A Sea Turtle Take In Dr. Witherington's opinion, HESCO baskets constitute significant habitat modification or degradation that could significantly impair the essential behavioral pattern of breeding. If HESCO baskets killed or injured a marine turtle, therefore, they would constitute a "Take," as defined by Section 373.2431(1)(c)2., Florida Statues: "'Take' means an act that actually kills or injures marine turtles, and includes significant habitat modification or degradation that kills or injures marine turtles by significantly impairing essential behavioral patterns, such as breeding, feeding, or sheltering." "Any person . . . that illegally takes . . . any marine turtle species, or the eggs or nest of any marine turtle species . . . commits a third degree felony, punishable as provided [by law.]" § 379.2431(1)(e)5., Fla. Stat.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: The Coastal Construction Control Line Permit applied for by the Stovalls and Buntins be issued with the conditions listed in paragraph 110, above. DONE AND ENTERED this 30th day of November, 2009, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of November, 2009. COPIES FURNISHED: Stanley M. Warden, Esquire Florida Fish and Wildlife Conservation Commission Bryant Building, Room 108 620 South Meridian Street Tallahassee, Florida 32399-1600 Kelly L. Russell, Esquire Department of Environmental Protection The Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ong-In Shin Florida Coastal Development Consulting, Inc. 4654 East Highway 20 Niceville, Florida 32578 Tom Beason, General Counsel Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Michael W. Sole, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (9) 120.52120.569120.57120.68161.041161.053161.085252.36379.2431 Florida Administrative Code (4) 62B-33.00262B-33.00562B-33.005162B-56.020