Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs ZDISLAW S. SZARAPKA, A/K/A STAN SZARAPKA, 00-002356 (2000)
Division of Administrative Hearings, Florida Filed:Bunnell, Florida Jun. 06, 2000 Number: 00-002356 Latest Update: Jul. 15, 2004

The Issue At issue is whether Respondent committed the offenses set forth in the Amended Administrative Complaint and, if so, what penalty should be imposed.

Findings Of Fact Petitioner, Department of Business and Professional Regulation, Construction Industry Licensing Board (Department), is a state agency charged with the duty and responsibility of regulating the practice of contracting pursuant to Chapters 20, 455 and 489, Florida Statutes. At all times material to the allegations of the Amended Administrative Complaint, Respondent was licensed in Florida as a Certified General Contractor, having been issued license number CG C018621, and authorized to engage in the practice of general contracting as an individual. At the time of the hearing, Respondent's license had been suspended. At no time material was Respondent licensed to practice contracting in Florida through Florida East Coast Properties, Inc. On or about November 13, 1995, Respondent, doing business as Florida East Coast Properties, entered into a contract with Kazimierz and Maria Charchut (the Charchuts) for construction of a single family residence to be located at 8 Farmsworth Drive, Palm Coast, Flagler County, Florida. The original contract price was $124,000. At the time of the signing of the contract, the Charchuts lived in Brooklyn, New York, and continue to reside there. The Respondent's license number does not appear on the contract. The Respondent's notification of the Construction Industries Recovery Fund does not appear on the contract. Between September 13 and November 28, 1995, the Charchuts paid Respondent a total of $44,000 of the contract price towards construction of the residence. This amount constituted more than 10% of the contract amount (10% of the contract amount would have been $12,400). A closing on the construction loan was scheduled for October of 1995. Respondent called Mr. Charchut a couple of days before the first scheduled closing telling him they could stop the closing so that they could get better interest rates. Between October 1995 and June of 1997, Respondent failed to appear at a total of three scheduled closings on the construction loan. The Charchuts wrote several letters and made several phone calls to Respondent expressing concern that the closing had not yet occurred although they had already paid him a substantial amount of money. The closing finally took place in October of 1997. Because of some change orders that were to be made to the house, including wooden floors and a longer driveway, the Charchuts paid an additional $14,813.75 at the closing bringing the total cost of the construction of the home to $138,813.75. Included on the Change Order form was an amount of $2,001.75 for water and sewer assessments, which comprised part of the $14,813.75 total additional moneys paid by the Charchuts. The closing agent testified that this closing was atypical, because the bank was concerned that Respondent held too much money in the construction project. She testified that the bank requires that builders have no more than ten percent deposit. Consequently, Respondent was required to reimburse the bank $16,786.25 of the Charchut's $44,000 deposit at the closing. This was accomplished by Respondent bringing a check to the closing in the amount of $25,000 and receiving a refund overage check from Flagler County Abstract Co., (written to Florida East Coast) in the amount of $8,213.75, resulting in Respondent paying a net amount of $16,786.25 at the closing. At the closing, the bank received a check from Flagler County Abstract Co. for $31,600 to put in the construction loan account. This amount was composed of the Charchut's payment of $14,813.75 plus Respondent's payment of $16,786.25. Mr. Charchut wrote to Respondent in March of 1998 expressing concern that the closing had taken place in October of 1997 but the construction of his home had not yet begun. Respondent replied to Mr. Charchut in a letter dated April 8, 1998, stating that he was sorry for the delay in beginning construction of the home and that he intended to begin construction the week of April 20, 1998. Respondent applied for the building permit on May 7, 1998. Respondent applied for water and sewer service on May 5, 1998. He began construction of the house in June or July of 1998. By the end of July 1998, Respondent finished the slab foundation and rough plumbing of the Charchut's home. Consequently, the mortgage company paid $14,769.40 out of the first draw payment on the construction loan to Respondent's company. Of that amount, $3,485.86 was for reimbursement for payment to subcontractors. In addition to the amounts paid to Respondent, the mortgage company paid Mastercraft Plumbing $1,894 and $5,656.60 to CRS Rinker Materials Corp. The total first draw was $22,320. After payment of the first draw in August of 1998, little if any work was done on the construction of the Charchut's home. After the initial work on the slab, Respondent stopped construction and told the Charchuts that he did not want to continue to build their home and was looking for another contractor to finish the house for them. After being told that Respondent did not want to work on the home, the Charchuts wrote to Respondent on October 5, 1998, notifying Respondent to stop doing further work on the property and asking him to notify the Building Department so a transfer of the construction permit to another builder could take place. The Charchuts subsequently engaged another contractor, Mr. V. M. Zarbo. Mr. Charchut testified that he paid approximately $160,000 for the house to be built, including the money paid to Respondent. Mr. Charchut testified that when Mr. Zarbo began his work, Palm Coast Utility asked him to pay the impact fee for water and sewer. Despite the Charchut's having paid Respondent $2,001.75 toward water and sewer assessments, Respondent's check for that amount made out to Palm Coast Utility Company was returned for insufficient funds. Consequently, the Charchuts had to pay $2,116.75 for this fee again through their subsequent general contractor, notwithstanding Respondent claiming that he had incurred this expense. When added together, the Charchuts paid Respondent a total of $51,650.50 for the work Respondent did on the house. The total is composed of the sum of $27,213.75 (the net Respondent retained on the original down payment), $14,769.40 paid to Respondent from the first draw, and $1,894 and $5,656.60 paid to Respondent's suppliers/subcontractors from the first draw. Additionally, the Charchuts paid $2,116.75 for payment of the utility impact fee that the Charchuts had to pay twice. The Charchuts asked their subsequent contractor to prepare an estimate of the cost of the work that Respondent performed on the home. His written estimate was for a total of $21,536.68. The Charchuts included that written estimate in a letter to Respondent dated November 16, 1998, asking for a refund of amounts they paid in excess of his costs. Roy Brand testified as an expert witness for Petitioner. Mr. Brand has been a certified commercial contractor for about 20 years. He reviewed the estimate of Respondent's expenses that was provided by the Charchut's subsequent contractor. It was Mr. Brand's opinion that the cost estimate was appropriate and, if anything, Respondent's expenses might have been less. Respondent testified that he spent more on some items that were listed in the estimate. Respondent, during the investigation leading up to this case, was given an opportunity to provide receipts to Petitioner's investigator of expenditures made to the house. The receipts supplied to Petitioner's investigator do not total an amount in excess of the estimate made by the Charchut's subsequent builder. Based upon Respondent's failure to provide receipts to prove that the estimate total was too low, Mr. Zarbo's good faith estimate of building expenses made after his inspection of the property, and testimony of Petitioner's expert witness as to the reasonableness of the estimate, the estimate of expenses for Respondent's work in the amount of $21,536.68 is accepted as appropriate. Thus, Respondent has failed to account for or return to the Charchuts $30,113.82, the difference between the amount paid by the Charchuts and the estimate of expenses.1 As of September 20, 2000, the Department's costs of investigation and prosecution, excluding legal costs, totaled $1,498.66. Previous disciplinary action At hearing, the Department offered proof that, on two prior occasions, Respondent had been subjected to disciplinary action by the Construction Industry Licensing Board (the Board). The first occasion is reflected in the terms of a Final Order of the Board, (Final Order No. BPR-2000-01399) dated April 4, 2000, which found Respondent guilty of violating Section 489.129(1)(c), Florida Statutes, by making misleading, deceptive, or fraudulent representations to a client; Section 489.129(1)(g), Florida Statutes,2 by acting in the capacity of a contractor in a name other than as set forth on the issued certificate or registration; Section 489.129(1)(h)1, Florida Statutes, by committing mismanagement or misconduct in the practice of contracting that causes financial harm to a customer; Section 489.129(1)(l), Florida Statutes, by signing a statement with respect to a project or contract with false information; Section 489.129(1)(m), Florida Statutes, by committing fraud or deceit in the practice of contracting; and Section 489.129(1)(n), Florida Statutes, by committing incompetency or misconduct in the practice of contracting and imposing the penalties of placing Respondent on probation for two (2) years and payment of an administrative fine, costs and restitution to a customer. The second occasion that Respondent was subjected to disciplinary action is reflected in the terms of a Final Order of the Board, (Final Order No. BPR-2000-01443) also dated April 4, 2000, which found that Respondent violated Section 489.129(1)(g), Florida Statutes, by acting in the capacity of a contractor under a certificate or registration other than in the name of the certificateholder; Section 489.129(1)(h)1 and 3, Florida Statutes, by committing mismanagement or misconduct in the practice of contracting that causes financial harm to a customer; Section 489.129(1)(l), Florida Statutes, by signing a statement with respect to a project or contract falsely indicating that payment had been made for all subcontracted work; Section 489.129(1)(m), Florida Statutes, by committing fraud or deceit in the practice of contracting; and Section 489.129(1)(n), Florida Statutes, by committing incompetency or misconduct in the practice of contracting; and imposing the penalties of probation, payment of fines, costs and restitution. Respondent apparently did not satisfy the fines and costs imposed by the foregoing orders as Respondent's license was suspended on May 17, 2000, for non-payment of fines, costs or restitution.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the Construction Industry Licensing Board enter a final order adopting the foregoing findings of fact and conclusions of law, and which, as penalty for the violations found, imposes an administrative fine in the total sum of $11,250, revokes Respondent's license, orders that Respondent pay restitution to the Charchuts in the amount of $30,113.82, and assesses costs of investigation and prosecution (through September 20, 2000) in the total sum of $1,498.66 against Respondent. DONE AND ENTERED this 12th day of December, 2000, in Tallahassee, Leon County, Florida. BARBARA J. STAROS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of December, 2000.

Florida Laws (8) 120.569120.60213.75489.119489.1195489.126489.129489.1425
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID WAYNE MILAM, 88-005192 (1988)
Division of Administrative Hearings, Florida Number: 88-005192 Latest Update: Apr. 07, 1989

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, documentary evidence received, and the entire record compiled herein, I make the following relevant factual findings: During times material hereto, Respondent was a certified residential contractor having been issued license number CR C018874 since 1981. Respondent, during late 1986, was approached by a Mr. Marlar, owner of Pinellas Builders, who requested that Respondent affiliate with Pinellas Builders using his licensure to qualify Pinellas. Respondent tentatively agreed to a business arrangement with Marlar, however, prior to the time that Respondent formally qualified Pinellas, the negotiations broke down and Respondent never formally qualified Pinellas. During January, 1987, Pinellas entered into a contract with a customer, John Kane of Clearwater, Florida, to build an addition to Mr. Kane's residence for a sum of $33,000. (Petitioner's Exhibit 1.) Pinellas was required to obtain a permit to construct the addition to Kane's residence. Pinellas obtained the permit and utilized Respondent's license to do so. Kane encountered difficulty with Pinellas as the subcontractors were not paid and liens and/or notices of intent to file liens were placed on his home. Mr. Kane ultimately had to rehire the subcontractors and pay them directly resulting in an additional expenditure by Kane of approximately $10,000 over and above the amount that Pinellas agreed to complete the addition to his home. During June of 1987, Kane filed a complaint with Petitioner and in connection therewith, Petitioner's investigator, H. Dennis Force, spoke to Respondent via telephone respecting the fact that permits were being pulled under his name. Respondent was unaware that Pinellas was utilizing his name as a qualifier to obtain permits nor was Respondent aware that Pinellas had obtained contracts to perform work utilizing his name as the licensing authority. As a result of Investigator Force's conversations with Respondent, Respondent revoked the letter of authorization given to Marlar during April, 1987. Respondent distributed copies of the revocation of authorization given to Marlar to the various local cities in the surrounding area. Respondent acknowledges his liability as a qualifier and accepts that responsibility. Respondent is not presently affiliated with any corporate entity in that he prefers to work as an individual such that he can insure the quality which he strives for comes to reality. Mr. Kane acknowledges that he never saw Respondent on the jobsite and had never met him during any of the negotiations with Marlar (Pinellas). Respondent received no monies from Kane or any other persons who had entered dealings with Pinellas.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a final order imposing a civil penalty of $500 payable to Petitioner within thirty (30) days and issuing a written letter of reprimand to Respondent based on his authorization of an unlicensed person to use his name to obtain permits. 1/ DONE and ENTERED this 7th day of April, 1989, in Tallahassee, Leon County, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of April, 1989.

Florida Laws (3) 120.5717.001489.129
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs ED J. ADAMS, 95-005908 (1995)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Dec. 04, 1995 Number: 95-005908 Latest Update: Aug. 14, 1996

The Issue The issues for determination are whether Respondent committed the acts alleged in the Administrative Complaint and, if so, what, if any, penalty should be imposed.

Findings Of Fact Petitioner is the governmental agency responsible for issuing licenses to practice as building contractors. Petitioner is also responsible for regulating such licensees on behalf of the state. At all times pertinent to this proceeding, Respondent has been licensed individually as a Certified General Contractor pursuant to license number CG C 0055328 issued by the Construction Industry Licensing Board (the "Board"). Respondent has never been licensed by the Board as the qualifying agent for Mr. Gary Butler ("Butler"), an unlicensed contractor. In 1993, Respondent entered into an agreement with Butler who has never been licensed by the Board. The terms of the agreement require Respondent to pull permits for construction projects entered into by Butler. Butler pays Respondent for each permit or weekly. Respondent supervises some, but not all, of the projects undertaken by Butler. In August, 1993, Mr. Lynn Kyler ("Kyler"), the owner of a residence constructed by Ms. Denise Pyke ("Pyke"), a Certified Residential Contractor, asked Pyke to find a contractor to build a new dock and boat house at Kyler's residence. The Kyler residence is a lake front home located at 10250 State Road 561 A, Clermont, Lake County, Florida. Kyler authorized Pyke to act as Kyler's agent for construction of the dock and boat house. Kyler resided in Indiana from August through late fall of 1993. Pyke obtained recommendations of various candidates including Butler. Butler represented himself as a licensed and insured builder of docks and boat houses. Butler provided Pyke with a business card representing that Butler is licensed and insured. Pyke obtained cost and design proposals from Butler and Norquist Construction Company and communicated the proposals to Kyler. Kyler chose Butler. Butler agreed to demolish the existing dock and construct a new dock and boat house (the "project"). Kyler paid Butler the full contract price of $6,897.60. Prior to the completion of the project, neither Respondent nor Butler disclosed to Pyke or Kyler that Butler was unlicensed. Nor did they disclose that Butler would use Respondent's license to pull the permit for the project. Respondent knew that Butler is not licensed as a contractor, in any capacity. On August 25, 1993, Respondent and Butler went to the Lake County Building Department. Respondent used his license to pull Permit Number T93- 04793 for the project. The permit was issued to Respondent, listed Respondent's license as the certified general contractor, and was maintained in the official records of the Lake County Building Department. Respondent listed himself on the permit as the contractor for the entire project without limitation and without reference to Butler. Respondent was not authorized by Pyke or Kyler to pull the permit or to participate in the project. At the time, neither Pyke nor Kyler were aware of Respondent's existence or his role in the project. Respondent did not participate and had no involvement in the project except pulling the permit. The project was commenced by Butler in August, 1993, and completed shortly thereafter. Respondent did not supervise or participate in the construction of the project. Butler began the project without first filing a Notice of Commencement. Butler constructed the project with only a 10 foot setback in violation of the 25 foot setback required in Lake County Code Ordinance 10.0401(3)(d). Butler also failed to obtain an electrical permit in violation of Standard Building Code, Section 103.1.1. (1991). The project, as built by Butler, has no value to Kyler. The project failed final inspection for violation of the 25 foot setback and failure to obtain an electrical permit. The roof tiles on the boat house had to be removed because they were falling off the roof. The project itself is coming apart. It will cost between $10,000 and $12,000 to bring the project into compliance with local code requirements and to make it usable. Respondent was aware of the 25 foot setback when he pulled the permit for the project. The project plans submitted for the permit reflect the 25 foot setback. Lake County allows contractors to withdraw permits that have already been pulled. Respondent never withdrew the permit for the project. Butler was unable to obtain a final inspection because he failed to file a Notice Of Commencement at the outset of the project. Pyke and Kyler filed the Notice Of Commencement in order to obtain the final inspection. As the contractor of record, it was Respondent's responsibility to ensure that a Notice of Commencement was filed and that the project passed final inspection. While obtaining the information necessary to file the Notice Of Commencement, Pyke and Kyler learned that Butler was unlicensed and uninsured and that Respondent had used his license to pull the permit. When confronted by Pyke, Respondent did not deny knowledge of the project and assured Pyke that the problems with the project would be corrected. Despite Respondent's assurances, the code violations have not been corrected. Nor have the defects in construction been corrected.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Board enter a Final Order finding Respondent guilty of violating: Sections 489.129(1)(c) and 455.227(1)(a); and Sections 489.129(1) (e), (f), (n), and (p). It is further recommended that the Board place Respondent on probation for three years, subject to reasonable conditions, impose an administrative fine of $5,000, and assess costs of $717.50 plus reasonable costs incurred by Petitioner subsequent to the date of this Recommended Order to investigate and prosecute this proceeding to its conclusion. RECOMMENDED this 28th day of March, 1996, in Tallahassee, Florida. DANIEL S. MANRY, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of March 1996.

Florida Laws (3) 17.001455.227489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 3
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs MARK LEWIS JENKINS, 17-004510PL (2017)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 09, 2017 Number: 17-004510PL Latest Update: Jan. 08, 2018

The Issue Whether Respondent performed an act which assisted a person or entity in engaging in the prohibited uncertified and unregistered practice of contracting, or whether he applied for and obtained a permit without having entered into a contract to perform the work specified in the permit, as set forth in the Administrative Complaint; and, if so, what is the appropriate sanction.

Findings Of Fact The Department of Business and Professional Regulation is the state agency charged with regulating the practice of construction contracting pursuant to section 20.165 and chapters 455 and 489, Florida Statutes. At all times material to these proceedings, Mr. Jenkins was licensed as a certified general contractor in the state of Florida, having been issued license number CGC 1513481. Mr. Jenkins' license is current and active. At all times relevant to the Administrative Complaint, Mr. Jenkins was the primary qualifying agent of Abacoa Construction, LLC (Abacoa). Mr. Jenkins was responsible for supervision of all operations of Abacoa; for all field work at all sites; and for financial matters, both for Abacoa in general and for each specific job. On or about October 29, 2015, Robert Maione entered into a contract with John Martinache, d/b/a All 4 One Project, LLC, for renovations to his residence located at 364 Golfview Road, Unit 407, North Palm Beach, Florida 33408. Mr. Maione was aware that Mr. Martinache was unlicensed. On or about December 8, 2015, Mr. Jenkins, d/b/a Abacoa, obtained Building Permit No. 16063 from the Village of North Palm Beach Building Department for electric, HVAC, and plumbing. The permit was for the renovations at the Golfview Road residence. Mr. Martinache proceeded on interior renovations requiring proper licensure without having been certified or registered to engage in the practice of construction contracting in the state of Florida. Mr. Jenkins was aware that Mr. Martinache was not licensed for this work. Mr. Jenkins did not have a contract for the construction at Golfview Road, did not supervise it, and received no compensation for it. Restitution cannot be calculated based on the available facts, as the value of the work and actual damages are unclear. There is no evidence of financial loss suffered by a consumer in this case. It was clearly and convincingly shown that Mr. Jenkins assisted a person or entity in engaging in the prohibited uncertified and unregistered practice of contracting. It was clearly and convincingly shown that Mr. Jenkins applied for and obtained a permit without having entered into a contract to perform the work specified in the permit. Mr. Jenkins has not been subject to prior discipline.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Construction Industry Licensing Board enter a final order finding Mark Lewis Jenkins in violation of sections 489.129(1)(d) and 489.129(1)(i), Florida Statutes; placing his contractor's license on probation for a period of two years; imposing an administrative fine of $8,500.00; and requiring him to complete an additional live continuing education course of seven hours emphasizing chapter 489 and implementing rules and to pay costs in the amount of $171.66. DONE AND ENTERED this 14th day of September, 2017, in Tallahassee, Leon County, Florida. S F. SCOTT BOYD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of September, 2017. COPIES FURNISHED: Labeed A. Choudhry, Esquire Ward Damon, Attorneys at Law 4420 Beacon Circle, Suite 100 West Palm Beach, Florida 33407-3281 (eServed) Ramsey D. Revell, Esquire Department of Business and Professional Regulation Capital Commerce Center 2601 Blair Stone Road Tallahassee, Florida 32399-2202 (eServed) James David Burkhart, Esquire Department of Business and Professional Regulation Capital Commerce Center 2601 Blair Stone Road Tallahassee, Florida 32399-2202 (eServed) Jason Maine, General Counsel Department of Business and Professional Regulation Capital Commerce Center 2601 Blair Stone Road Tallahassee, Florida 32399-2202 (eServed) Daniel Biggins, Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation Capital Commerce Center 2601 Blair Stone Road Tallahassee, Florida 32399 (eServed)

Florida Laws (13) 120.569120.57120.6817.00117.00220.165455.225455.2273489.101489.1195489.127489.129489.146 Florida Administrative Code (1) 61G4-18.001
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. KONRAD V. ISING, 83-002892 (1983)
Division of Administrative Hearings, Florida Number: 83-002892 Latest Update: Mar. 19, 1984

The Issue The issue for determination at the final hearing was whether the contracting license of the Respondent Konrad v. Ising should be suspended, revoked, or otherwise disciplined by the Petitioner Department of Professional Regulation, for alleged violations of Chapter 489, Florida Statutes. At the final hearing Petitioner's Exhibits 1 and 2(a)-(g) were offered and admitted into evidence. The Respondent testified on his own behalf.

Findings Of Fact The Respondent Konrad V. Ising is licensed to practice contracting in Florida, and is a licensed certified general contractor holding license number CG C009669, a license current and active from 1982 through the present. The Respondent qualified Master Craft Constructors using license number CG C009669. During 1982, the Respondent entered into an association with Carlton Mosher whereby the Respondent would use his contractor's license to obtain building permits for construction projects which Mosher had contracted. The Respondent hoped his association with Mosher would lead to a partnership and assist him in obtaining practical experience in the construction field. During his association with the Respondent, Mosher was not a licensed contractor. In December 1982, Mosher, doing business as Re-Builders, contracted with Russell Hirstins to construct a room addition on his home at 4034 27th Avenue, St. Petersburg, Florida. On December 3, 1982, an application for a building permit for the job was submitted to the City of St. Petersburg and permit number 88638 was issued. The permit was obtained using the Respondent's license number and Respondent is listed as the job contractor. However, the Respondent performed no work on the Hirstins job, maintained no control over Mosher's work, failed to adequately supervise the project, and failed to qualify Re-Builders with the Construction Industry Licensing Board. Since becoming licensed in 1975, the Respondent has not been involved in any other disciplinary proceedings. At the final hearing, the Respondent candidly acknowledged that his association with Mosher was a regrettable mistake. The project was completed by Mosher to the apparent satisfaction to the Hirstins.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That a Final Order be entered by the Construction Industry Licensing Board finding the Respondent Konrad V. Ising guilty of violating Section 489.129(1)(g) and (j), Florida Statutes, and imposing a $250 administrative fine. DONE AND ORDERED this 30th day of January 1984, in Tallahassee. SHARYN L. SMITH Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January 1984. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Konrad V. Ising Post Office Box 1023 Maitland, Florida 323751 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32302

Florida Laws (3) 120.57489.119489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DOANLD F. ROYAL, 88-003298 (1988)
Division of Administrative Hearings, Florida Number: 88-003298 Latest Update: Dec. 20, 1988

Findings Of Fact At all times material to this proceeding, the Respondent, Donald F. Royal, was licensed as a registered roofing contractor in the State of Florida, holding license number RC 0031831. During the times of the alleged violations, the Respondent was the sole qualifying agent for J & J Construction Company (the company.) The principals of the company were the Respondent and a man named James Jimenez. Both men sold jobs for the company and were responsible for overseeing some of the work of the company. The Respondent pulled permits for, and was primarily responsible for, the roofing work contracted by the company. But sometimes, when the company had more than one job going at the same time, the Respondent would be primarily responsible for overseeing one, and Jimenez would be primarily responsible for overseeing the other. The Respondent thought that Jimenez held a license of some kind that enabled him to do some kinds of minor renovation construction. The Respondent restricted his work to roofing and did not mind Jimenez doing some renovation work on the side, separate from the business of the company. But the Respondent understood that Jimenez' "side deals" would be done separately under Jimenez' own license and would not be part of the business of the company. On or about August 14, 1986, Jimenez entered into a contract on behalf of the company to build an addition, remodel and reroof the existing structure and roof the addition of the residence of Ernest and Mercedes Riccio located at 3117 West Henry Avenue, Tampa, Florida. The contract price was $18,999. Jimenez telephoned the Respondent about the job but only told him about the part of the contract that called for the existing roof to be torn off and reroofed. He told the Respondent that the contract price for the job was $3,800. The Respondent pulled a permit for what he thought was the job and started and finished what he thought was the work to be done. The Respondent personally was compensated approximately $700-$800 for his part in the reroofing job. When the Respondent was finished, Jimenez continued with the rest of the contract, which was to include roofing the addition, without telling the Respondent about it. Jimenez did not get very far before a Tampa building inspector happened past and, seeing unfamiliar work in process, inspected the job site. He discovered that the building permit displayed at the site had been altered to expand the work purportedly permitted to include building, in addition to the roofing work for which the Respondent had obtained a permit. Someone other than the Respondent (probably Jimenez although he denied it) altered the permit. The Respondent knew nothing about the contract (other than the reroofing that he did), the alteration of the permit, or the work Jimenez was doing after he left the site. When he discovered the permit violations, the building inspector "red- tagged" the entire job, and work stopped. That was only the beginning of the Riccios' problems. Further investigation revealed that the job would require not only a valid permit but also zoning variances and utility easements. Although the contract had called for the company to obtain all necessary permits, Jimenez and the Riccios agreed that the Riccios would apply for whatever else was necessary in their own names and that Jimenez would assist them. By the time work stopped, the Riccios already had paid the company $12,666 of the total contract price. Nonetheless, when Jimenez' minimal assistance did not resolve the Riccios' problems quickly, Jimenez decided that he already had put too much into the job, and he began to lose interest and make himself scarce. The Riccios finally got their necessary permits on January 26, 1987. They then approached Jimenez about the work to be done under the contract (and the matter of the remaining $6,333 draw). The Riccios and Jimenez agreed that the Riccios would provide the materials and supplies necessary to complete the work and the company would provide the labor. Despite these alternate arrangements, the company did not promptly finish the job. Eventually, the Riccios gave up on Jimenez and in April or May, 1987, began to deal directly with the company's former job superintendent, a man named Ray. To improve their chances of getting the job done (and reduce some of their extra expenses), the Riccios agreed to allow Ray to live in the house free of charge while they were doing the work. The job still did not get finished. Eventually, Mrs. Riccio and some of her relatives finished the job themselves. Even so, the Riccios wound up spending about $20,000, in addition to the $12,666 they had paid the company, to complete the job which the company had contracted to do for $18,999, total. The Respondent was not aware of any of Jimenez' dealings with the Riccios after the Respondent completed his reroofing work. The Respondent assumed that Jimenez had called for a final inspection and that the job had been completed satisfactorily. But in approximately February or March, 1987, the Respondent was contacted by a DPR investigator in connection with the Riccios' complaint against the company. He learned at about that time about Jimenez' other dealings with the Riccios. He also learned that the roof over the addition that had been built had failed inspection. The Respondent eventually corrected the deficiencies, and the roof passed final inspection on August 19, 1987. The Respondent attempts to excuse himself of any wrongdoing, saying that he had a right to delegate the supervision of jobs such as the Riccio job to Jimenez and that he himself was victimized by Jimenez, along with the Riccios. Respondent nonetheless negotiated with Jimenez through the end of the year 1987 in an attempt to come to an agreement to continue to do business together, but the negotiations finally failed. The Respondent was disciplined by the Construction Industry Licensing Board on January 7, 1988, for offenses which occurred during the same time frame in which the Riccio job took place.

Recommendation Based on the foregoing Findings Of Fact and Conclusions Of Law, it is recommended that Construction Industry Licensing Board enter a final order finding the Respondent, Donald F. Royal, guilty of violating Section 489.129(1)(j) and (m), Florida Statutes (1987), and imposing on him an administrative fine in the amount of $1,000. RECOMMENDED this 20th day of December, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of December, 1988. COPIES FURNISHED: Mr. Fred Seely, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Elizabeth R. Alsobrook, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Donald F. Royal, pro se 8509 North 16 Street Tampa, Florida 33604 Bruce D. Lamb General Counsel Dept. of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (3) 489.105489.119489.129
# 6
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs RALPH N. BATTAGLIA, INTERCONTINENTAL CONSTRUCTION CORPORATION, INC., 07-000052PL (2007)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jan. 04, 2007 Number: 07-000052PL Latest Update: May 08, 2007

The Issue Whether Respondent committed the violations alleged in the Amended Administrative Complaint issued against him and, if so, what disciplinary action should be taken.

Findings Of Fact Based on the evidence adduced at hearing, and the record as a whole, the following findings of fact are made to supplement and clarify the facts to which the parties stipulated at the outset of the final hearing (Parties' Stipulations)2: The contract referenced in the Parties' Stipulations (Building Contract) was signed by Mr. Stasinos (on behalf of ICC) and Mr. Skiera (on behalf of himself and his wife) on June 29, 2000. The home that ICC agreed to build for the Skieras (Skiera Residence) was described in the Building Contract as a "[c]ustom two-story residence with detached garage and riding cor[r]al for a total of 5,370 square feet." It was to be constructed on a tract of land owned by the Skieras in Boynton, Beach, Florida. The Building Contract provided for the following allowances: $20,000.00 for "electrical"; $17,000.00 for "plumbing"; $15,000 for "HVAC"; a "door hardware allowance" of "$50.00 per [interior] door"; $6,000.00 for a "stacked stone veneer" exterior; an "entry door hardware allowance" of "$100.00 per door"; $15,000.00 for "kitchen cabinetry and vanity"; $8,000.00 for "counter tops and vanity tops"; $9,000.00 for "landscaping," including "trees, shrubs, sod, automatic time clock, [and an] operated irrigation system with rain sensor"; and $7,000 for "driveways, walkways, [and] flatwork." There was no written statement in the Building Contract explaining a consumer's rights under the Construction Industries Recovery Fund, as then required by Section 489.1425, Florida Statutes. The Building Contract contained a "[p]ayment [d]raw [s]chedule," which provided as follows: Upon execution of contract: 10%- $36,608.00 Thereafter, progress payments based on schedule of values. This "schedule of values" (referred to in the "[p]ayment [d]raw [s]chedule") contained the following "scheduled values" (excluding change orders): 1. Permits $21,600.00 2. Clearing/Grading/Fill $10,800.00 3. Foot'gs. Undgr Plumb, Soil Treatmt $23,000.00 4. Foundation/Slab poured $32,760.00 5. Exterior Walls/Tie Beam $26,600.00 6. Roof Trusses $26,600.00 7. Roof Sheathing/Felt $19,400.00 8. Interior Framing Complete $14,000.00 9. Windows/Exterior Door Frames Set $14,400.00 10. 2nd Plumbing/Tub Set $7,200.00 11. Wiring Rough-In $14,400.00 12. HVAC Ducts Installed $7,200.00 13. Roof Shingles/Tiles Installed $14,400.00 14. Insulation (wall & ceiling) $4,200.00 15. Exterior Trim/Soffits $11,800.00 16. Drywall Hung $14,400.00 17. Drywall Finish $10,800.00 18. Interior Trim/Interior Doors Installed $13,400.00 19. Interior Paint $8,800.00 20. Siding/Stucco $14,400.00 21. Exterior Paint Complete $8,800.00 22. Exterior Doors & Garage Door Install $6,200.00 23. Cabinets/Countertops Installed $10,000.00 24. Plumbing Finish $3,600.00 25. Electrical Finish $5,600.00 26. HVAC-Compressor/A.H. Installed $10,920.00 27. Driveway/Walks Installed $3,600.00 28. Landscaping/Irrigation $7,200.00 There were six separate change orders. They were dated August 20, 2000 (Change Order No. 001), August 29, 2000 (Change Order No. 002), September 26, 2000 (Change Order No. 003), October 15, 2000 (Change Order No. 004), October 15, 2000 (Change Order No. 005), and November 10, 2000 (Change Order No. 006). As of December 21, 2000, ICC had been paid in full for all six change orders, as well as for items 1 through 8 on the "schedule of values." As of February 27, 2001, ICC had received additional monies from the Skieras: payment in full for items 9 through 12 and 15 on the "schedule of values" and partial (50 percent) payment for items 13 and 20 on the "schedule of values." As of April 10, 2001, ICC had been paid a total of $287,966.20 (all from the proceeds of a mortgage loan the Skieras had obtained from Admiralty Bank) for work done on the Skiera Residence. On May 1, 2001, the Skieras paid ICC an additional $16,800.00 for drywall work, bringing the total amount of payments that ICC had received from (or on behalf of) the Skieras, as of that date, to $304,766.20. The Skieras made no further payments to ICC. The "eight valid claims of lien" referenced in the Parties' Stipulations were filed by eight different subcontractors, all of whom had been hired by ICC to work on the Skiera Residence: Boca Concrete Pumping, Inc.; Gulf Stream Lumber Company; L & W Supply Corp., d/b/a Seacoast Supply; Waste Management of Palm Beach; B.T. Glass & Mirror, Inc.; Boca Raton Decorating Center Company; American Stairs; and Broten Garage Door Sales Inc.3 Boca Concrete Pumping was the "very first" subcontractor to work on the construction of the Skiera Residence. It did the "slab work, the foundation" (referenced in item 4 of "schedule of values"). Its lien was recorded on December 6, 2000. The lien was in the amount of $1,001.25, and it indicated, on its face, that it was for unpaid "concrete pumping" that had been furnished between September 8, 2000, and September 22, 2000. A satisfaction of this lien, dated March 8, 2001, was filed March 24, 2001. Gulf Stream Lumber's original lien was recorded February 15, 2001. It was in the amount of $67,872.59, and it indicated, on its face, that it was for unpaid "building material" that had been furnished between August 15, 2000, and January 24, 2001. An amended claim of lien was recorded May 3, 2001, in the amount of $36,530.59 for unpaid "building material" that, according to the lien, had been furnished between August 25, 2000, and March 27, 2001. A satisfaction of the original lien and amended claim of lien, dated November 30, 2001, was filed December 5, 2001. The liens were satisfied, pursuant to the terms of a Settlement Stipulation, upon the Skieras' payment of $39,579.28 to Gulf Stream Lumber. L & W Supply's lien was recorded April 30, 2001. It was in the amount of $4,536.98, and it indicated, on its face, that it was for unpaid "building materials [and] related items" that had been furnished between December 16, 2000, and January 30, 2001. A satisfaction of this lien, dated October 11, 2001, was filed November 7, 2001. The lien was satisfied by the payment of $10.00 "and other good and valuable consideration" (which was the payment of an additional $2,850.00 by check dated October 11, 2001). Waste Management of Palm Beach's lien was recorded May 31, 2001. It was in the amount of $1,665.89, and it indicated, on its face, that it was for unpaid "[w]aste [r]emoval [s]ervices" that had been furnished between August 30, 2000, and April 5, 2001. A satisfaction of this lien, dated October 19, 2001, was filed November 13, 2001. B.T. Glass & Mirror's lien was recorded June 29, 2001. It was in the amount of $3,560.00, and it indicated, on its face, that it was for an unpaid "glass/mirror package" that had been furnished between May 3, 2001, and May 31, 2001. A satisfaction of this lien, dated October 19, 2001, was filed November 13, 2001. The lien was satisfied by the payment of $1,600.00 (by check dated November 10, 2001), plus an agreement to provide "$2,000.00 in gazebo or arbor products from the Hitching Post," the Skieras' family business. Boca Raton Decorating Center's lien was recorded May 19, 2001. It was in the amount of $1,218.79, and it indicated, on its face, that it was for unpaid "paint, sealers [and] sundries" that had been furnished between May 1, 2001, to May 2, 2001. A satisfaction of this lien, dated October 11, 2001, was filed November 7, 2001. American Stairs' lien was recorded August 16, 2001. It was in the amount of $4,188.00, and it indicated, on its face, that it was for unpaid "[s]tairs and [r]ailings" that had been furnished between June 8, 2001, and June 15, 2001. A satisfaction of this lien was executed on October 15, 2001. Broten Garage Door Sales' lien was recorded September 5, 2001. It was in the amount of $3,214.00, and it indicated, on its face, that it was for the unpaid "sale and installation of garage doors and openers," which took place between June 25, 2001, and July 17, 2001. A satisfaction of this lien, dated January 31, 2002, was filed on February 5, 2002. At a meeting "in the early part of August [2001]" attended by Respondent, Mr. Stasinos, the Skieras, and the president of the bank from which the Skieras had borrowed the money to pay for the construction of their residence, Respondent announced that, on behalf of ICC, "he was filing [for] bankruptcy."4 ICC stopped working on the Skiera Residence after this meeting. At the time, the Skiera Residence was approximately 70 to 80 percent completed (and the Skieras had paid ICC a total of $304,766.20, or approximately 80 percent of the total contract price (including change orders) of $378,286.205). In addition to paying $57,316.62 to satisfy the "eight valid claims of lien" referenced in the Parties' Stipulations, the Skieras paid approximately an additional $57,000.00 to other subcontractors who provided goods and/or services "needed to complete the house." The $10,000.00 check referred to in the Parties' Stipulation 14 (that the Skieras received from Andover Construction, Inc.) did not "represent any kind of final settlement" between the Skieras and ICC. The October 4, 2001, Certificate of Occupancy for the Skiera Residence referred to in the Parties' Stipulations indicated, on its face, that ICC was the contractor, notwithstanding that ICC had abandoned the project "in the early part of August [2001]." Respondent has been a Florida-licensed general contractor since July 29, 1987. In his capacity as ICC's licensed qualifier, he has previously (by Final Order filed in DBPR Case Nos. 2001-03283 and 2001-03284 on December 23, 2003) been found guilty of, and disciplined for, violating (in connection with two residential construction projects undertaken by ICC for A. Richard Nernberg) the same subsections of Section 489.129(1), Florida Statutes (Subsections (1)(g), (i), and (m)) that he is accused of violating in the instant case. In these prior disciplinary proceedings, Respondent's license was suspended for two years, and he was fined $6,000.00 and required to pay $958.30 in investigative costs. Administrative complaints were also filed against Respondent in DBPR Case Nos. 94-15958 and 97-17352. Both of these cases were resolved by settlement stipulations in which Respondent "neither admit[ted] [nor] denie[d] the allegations of fact contained in the [a]dministrative [c]omplaint[s]."

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Board issue a Final Order: finding Respondent guilty of violating Section 489.1425(1), Florida Statutes, as alleged in Count I of the Amended Administrative Complaint, and fining him $1,000.00 for this violation; (2) finding Respondent guilty of the violation of Section 489.129(1)(g)1., Florida Statutes, relating to Boca Concrete Pumping's December 6, 2000, $1,001.25 lien, alleged in Count II of the Amended Administrative Complaint, and taking the following disciplinary action against him for this violation: suspending his license for four years (with such suspension to run consecutively with his current suspension); (b) fining him $5,000.00; (c) requiring him to pay restitution in the amount of $1,001.25 to the Skieras; and (c) ordering him to reimburse the Department for all reasonable investigative and prosecutorial costs (excluding costs related to attorney time) incurred by the Department; and (3) dismissing all other charges in the Amended Administrative Complaint. DONE AND ENTERED this 8th day of May, 2007, in Tallahassee, Leon County, Florida. S STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of May, 2007.

Florida Laws (16) 1.01120.569120.5717.001206.20218.79455.2273458.331489.115489.119489.1195489.129489.140489.1425627.8405810.02
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs ROBERT LAMBERT, D/B/A THE SCREENBUILDER/ALUMINUM TRIM, 89-005648 (1989)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Oct. 17, 1989 Number: 89-005648 Latest Update: Mar. 22, 1990

The Issue An administrative complaint dated June 7, 1989, alleges that Respondent violated Chapter 489, F.S., governing the construction industry, by completing a contracting job without having obtained a local building permit. The issue in this proceeding is whether the violation occurred, and if so, what discipline is appropriate. An ancillary issue is what effect, if any, Respondent's discharge in bankruptcy dated January 9, 1989, would have on any penalty in this case.

Findings Of Fact At all times material, and between July 1985 and July 1989, Robert Lambert was licensed by the Florida Construction Industry Licensing Board as a Registered Aluminum Specialty Contractor, with license number RX-0048976. Robert Lambert was the sole qualifying agent for The Screenbuilders Aluminum Trim, 1410 Elk Court, Apopka, Florida, a partnership business in which Lambert was a partner. In June 1987, the Screenbuilders entered into a written contract with Cecil Floyd to construct a carport and screened-in porch and new roof over Mr. Floyd's home at 741 Baron Road, Orlando, Orange County, Florida. The entire job was completed without Lambert's having obtained a building permit from the Orange County Building Department. Section 103 of the Standard Building Code of 1985, as adopted in the Orange County Building Code, requires that a building permit be obtained prior to altering, repairing, improving, converting, constructing, or demolishing any building or structure in the jurisdiction. (Petitioner's exhibits #2 and #3) Respondent and his agents knew that they needed a permit from the Orange County Building Department. For other jobs they had routinely obtained permits. After the work commenced, Lambert attempted to obtain a permit for the job. The building department would not accept the paperwork he offered and Cecil Floyd refused to pay for another plat as he had already paid out the entire contracted for monies for the job. To date, no permit for the Floyd job has been obtained. Robert Lambert's licensure file reveals several prior disciplinary actions, including revocation on January 11, 1990. As of the date of hearing, no final order on that action had been issued. On January 9, 1989, George L. Proctor, Bankruptcy Judge for the U.S. Bankruptcy Court, Middle District of Florida, entered a "Discharge of Debtor", providing as follows: DISCHARGE OF DEBTOR It appears that the person named above filed a petition commencing a case under title 11, United States Code on August 29, 1988 , that an order for relief was entered under chapter 7, and that no complaint objecting to the discharge of the debtor was filed within the time fixed by the court [or that a complaint objecting to discharge of the debtor was filed and, after due notice and hearing, was not sustained]. IT IS ORDERED THAT: The above-named debtor is released from all dischargeable debts. Any judgement heretofore or hereafter obtained in any court other than this court is null and void as a determination of the personal liability of the debtor with respect to any of the following: debts dischargeable under 11 U.S.C. Section 523; unless heretofore or hereafter determined by order of this court to be nondischargeable, debts alleged to be excepted from the discharge under clauses (2), (4) and (6) of 11 U.S.C. Section 523 (a); debts determined by this court to be discharged. All creditors whose debts are discharged by this order and all creditors whose are declared null and void by paragraph 2 above are enjoined from instituting or continuing any action or employing any process or engaging in any act to collect such debts as personal liabilities of the above-named debtor. Respondent Exhibit #1

Recommendation Based on the foregoing, it is hereby, RECOMMENDED That Respondent, Robert Lambert, be found guilty of violation of Section 489.129(1)(d), F.S. and fined $1,000.00. DONE AND RECOMMENDED this 22nd day of March, 1990, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of March, 1990. COPIES FURNISHED: Jack L. McRay, Esquire Dept. of Professional Regulation 1940 N. Monroe St., Suite 60 Tallahassee, FL 32399-0792 Robert Lambert 1410 Elk Court Apopka, FL 32712-3026 Kenneth D. Easley, General Counsel Dept. of Professional Regulation 1940 N. Monroe St., Suite 60 Tallahassee, FL 32399-0792 Fred Seely, Executive Director Construction Industry Licensing Board P.O. Box 2 Jacksonville, FL 32202

USC (1) 11 U.S.C 523 Florida Laws (3) 455.225489.1195489.129
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. ROLAND C. RAY, 82-002395 (1982)
Division of Administrative Hearings, Florida Number: 82-002395 Latest Update: Apr. 27, 1983

Findings Of Fact The Respondent is a registered general contractor, having been issued license number RG 0012013. On October 3, 1980, the Respondent, d/b/a Five Ray Enterprises, Inc., entered into a contract with David and Laytha Danley to construct a residence near Brooksville, Florida, for the sum of $61,621.00. This contract was a construction management type of agreement in which the Respondent was to be paid a fee for his services. The Respondent commenced construction, and completed between 85 percent and 95 percent of the project before discontinuing an active role in the work during June of 1981. The Respondent's base of operations was in Winter Park, nearly 100 miles from the construction site, and he was having some personal problems. Therefore, the Respondent agreed with Al Nickola to have Nickola supervise the completion of construction, which involved some painting, grading, finish electrical work and the installation of appliances. The Respondent knew that Al Nickola was unlicensed as a contractor when he entered into the agreement with Nickola to complete the construction. Before he discontinued his work on the project, the Respondent received all the inspections except for the Certificate of Occupancy. His agreement with Nickola was to complete the work which was left and to obtain the Certificate of Occupancy. The Respondent did not properly qualify Five Ray Enterprises, Inc., under which name he contracted to build the residence for the Danleys. On September 9, 1981, the Citrus County Hoard of Examiners revoked the Respondent's license for abandonment of the Danley construction project. However, the minutes of the Board meeting at which this action took place, do not reflect whether or not a full examination was made of all the facts. They simply indicate that the Respondent did not appear at the meeting as requested.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Respondent, Roland C. Ray, be found guilty of one violation of Section 489.129(1)(g), Florida Statutes, and one violation of Section 489.119(2) and (3), Florida Statutes, and that he be assessed an administrative fine of $250 on each charge for a total fine of $500. It is further RECOMMENDED that the Respondent be found guilty of violating Section 489.129(1)(i), Florida Statutes, and that his license be suspended until such time as the Respondent has obtained reinstatement of his Citrus County license. And it is further RECOMMENDED that the Respondent be found not guilty of violating Section 489.129(1)(k), Florida Statutes. THIS RECOMMENDED ORDER entered on this 11th day of February, 1983, in Tallahassee, Florida. WILLIAM B. THOMAS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of February, 1983. COPIES FURNISHED: John O. Williams, Esquire 547 North Monroe Street Suite 204 Tallahassee, Florida 32301 Roland C. Ray 305 North Pennsylvania Avenue Winter Park, Florida 32789 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD DEPARTMENT OF PROFESSIONAL REGULATION, Petitioner, DPR Case No. 0018288 DOAH Case No. 82-2395 ROLAND C. RAY RG 0012013 Post Office Box 5877 Orlando, Florida 32855 Respondent. /

Florida Laws (3) 120.57489.119489.129
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PEDRO LANDERA, 88-003306 (1988)
Division of Administrative Hearings, Florida Number: 88-003306 Latest Update: Feb. 10, 1989

Findings Of Fact At all times relevant hereto, respondent, Pedro P. Landera, was a certified general contractor having been issued license number CG C005371 by petitioner, Department of Professional Regulation, Construction Industry Licensing Board (Board), in March 1973. In January 1986 the license was suspended by the Board for three years and, except for the charges pending in this proceeding, Landera would be eligible to have it reactivated in early 1989. Thus, Landera has been without authority to use his license for the last three years. Landera did not contest the Board's suspension action and, in a settlement stipulation, admitted he violated Subsections 489.129(1)(c), (d), (e), (f) and (m), Florida Statutes (1981), by certain conduct taken in December 1983. On August 11, 1986, an individual using the name of James Burke entered into a construction contract with Charlie E. Mincey, the owner of Charlie Tires Service, 1700 N. W. 79th Street, Miami, Florida. The contract, which has been received in evidence as petitioner's exhibit 4, called for Burke, "in a timely manner," to make the following additions to Mincey's tire shop: construct a 34' X 40' room onto the existing building, erect an aluminum shed across the front of the building, including a four foot concrete slab floor, and add a five foot wall across the back side of the building. Burke represented on the contract that he held license number 254514-4. However, a search of the Board's records revealed Burke held no state license. The total price for the work was $15,650. On August 13, Mincey paid Burke $3,000 as a down payment on the job. According to Mincey, Burke began work on the additions several weeks after the contract was executed and continued to do so on and off for a few months. Eventually, a concrete block wall for the 34' x 40' room was built, but it had no roof, windows, doors, electric wiring, plumbing or paint. The aluminum shed was never built nor did Burke construct a five foot wall at the rear of the building as required by the contract. During October and early November 1986 Mincey made additional payments to Burke in the amount of $3,175, 1,000, $500, $400, $300, $300, and $40. This made a total of $8,715 paid by Mincey to Burke. Despite these payments, several subcontractors came to the job site during the same time period to unload materials but requested payment from Mincey before they would release them. Mincey paid the subcontractors $2,593.64, as evidenced by receipts received in evidence as petitioner's exhibit 7. When Burke did not return to the job site, and the project was still far from completed, Mincey attempted to contact Burke but could not find him. When he left the job site for the final time, Burke gave Mincey no notice of his intention to leave the job unfinished or any reason for doing so. Burke's whereabouts are still unknown, and there is now pending an outstanding warrant for his arrest. On September 30, 1986, a building permit application was filed with the Metropolitan Dade County building and zoning department seeking a permit for work to be done on Mincey's business. The application was filled out with three different colors of ink and in more than one person's handwriting. A carbon copy of the application has been received in evidence as petitioner's exhibit 9. The document was authenticated by a permit clerk of the Metropolitan Dade building and zoning department who identified the cashier's validation stamp, issuance date and permit number affixed to the document, all being indicia that the application was received and processed by that department. Further, the clerk attested to the fact that the carbon copy was a document normally kept in the regular course of business by her department. The application carries the signature, license number and social security number of respondent. The authenticity of respondent's signature was confirmed by a questioned document examiner whose testimony has been accepted as being credible and persuasive and was corroborated by respondent's own admission that the signature was his own. The author of the remaining writings on the document is unknown. Pursuant to the above application, a building permit was issued on October 1, 1986, for the work performed by Burke. The inspection record, which has been received as petitioner's exhibit 8, reflected that the job site was inspected by a Dade County inspector on October 1 and November 12, 1986. Also, the inspection record reflected that Gila Construction Company (GCC) was the contractor on the job. GCC is a Miami firm that Landera qualified in March 1984. Its owner is Gilbert Castillo. Mincey's building remains unfinished as of this date, and he contends the value of the work is less than the $11,308 that he paid to Burke and the subcontractors. In attempting to resolve the matter, Mincey learned that Landera's license number was on the permit application, and a complaint was eventually filed with the Board. However, prior to hearing, Mincey had never seen or talked to Landera, knew nothing of GCC, and considered the business transaction to be between he and Burke. Landera denied knowing Burke or authorizing him to use his license. Also, he maintained that he has not used his suspended license since the Board's action in early 1986. He denied signing the application in question and had no explanation as to how his signature got on the application except to suggest that someone may have obtained one with his signature and then fraudulently used the same to obtain a permit. Even so, there was no reason for Landera to sign an application during this period of time since his license was under suspension. Castillo, who owns GCC, denied knowing Burke or Mincey or having any knowledge of or participation in the Mincey job.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondent be found guilty as set forth in the conclusions of law, that he pay a $3,500 fine, and that his license be suspended until January, 1991. DONE AND ORDERED this 10th day of February, 1989, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of February, 1989. APPENDIX Petitioner: 1-2. Covered in finding of fact 1. 3-4. Covered in finding of fact 2. Covered in findings of fact 3. and 5. Covered in finding of fact 4. Covered in finding of fact 6. Covered in finding of fact 1. Respondent: Covered in findings of fact 1 and 2. Covered in findings of fact 3 and 5. Covered in findings of fact 4 and 5. 4-5. Covered in finding of fact 8. Covered in findings of fact 2, 5 and 6. Covered in findings of fact 6 and 9. Covered in finding of fact 6. 9 Covered in findings of fact 9 and 10 COPIES FURNISHED: George W. Harrell, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Luis F. DeLaCruz, Jr., Esquire 300 Sevilla Avenue Suite 313 Coral Gables, Florida 33134 Kenneth E. Easley, Esquire General Counsel 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201

Florida Laws (6) 120.57489.105489.119489.127489.12990.803
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer