Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
KEVIN SCULLY vs SAM PATTERSON AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 05-000058 (2005)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jan. 07, 2005 Number: 05-000058 Latest Update: May 23, 2005

The Issue Whether Sam Patterson’s proposed dock project is exempt from the need to obtain an Environmental Resource Permit (ERP) from the Department of Environmental Protection (Department) under Florida Administrative Code Rules 40E-4.051(3)(c) and (d).

Findings Of Fact The Parties Mr. Scully resides at 941 Brookdale Drive, Boynton Beach, Florida, Lot 16, adjacent to and south-southeast of Mr. Patterson's residential property. The northern or rear portion of Mr. Scully's lot borders on an artificial canal that is designated a Class III water by Department rule. He does not have a dock per se; he moors his boat against and parallel to a narrow concrete area (and his lot line), separated by buffering material. Mr. Patterson, the applicant, owns the property at 930 Brookdale Drive, Boynton Beach, Florida, Lot 15. Lot 15 is north-northwest and adjacent to Mr. Scully’s property. This residential property is currently leased to others. The residential property (Lot 14) adjacent to and north-northeast of Mr. Patterson's lot is apparently owned by an individual named Meloche. The Department has the jurisdiction to determine whether the proposed project is exempt from ERP requirements. The Proposed Project On or about September 13, 2004, Mr. Patterson filed an application requesting an exemption to replace an existing five- foot by 21-foot (105-square feet) marginal dock in the same location, configuration, and dimensions as the existing dock. He also requested an exemption to install a five-foot by 16-foot (80-square feet) wooden finger pier extending perpendicular to and from the middle of the existing marginal dock. As of the final hearing, the project has been revised such that the wooden finger pier will extend 11.8 feet (rather than 16 feet) and perpendicular from the middle of the marginal dock. Mr. Patterson changed the length of the finger pier to comply with City regulations, which are not at issue in this case. The “Site Plan” is attached to the Department’s Notice of Determination of Exemption. (JE 1). The “Site Plan” shows a one-story residence on Mr. Patterson's Lot 15. The front of the lot measures 100 feet, whereas the rear of the lot (that abuts the canal on the easternmost portion of the lot) is 50 feet in length from south to north. The seawall is one-and-one-half feet in width. The existing marginal dock abuts the seawall running south to north and is 21 feet long and five feet wide. Small concrete platforms abut the marginal dock on the south and north. The Department reviewed the original application and on October 13, 2004, advised Mr. Patterson, in part, that his project was exempt from the need to obtain an ERP under Florida Administrative Code Rules 40E-4.051(3)(c) and (d). The Department had not reviewed the change to the project prior to the final hearing. See Finding of Fact 5. Lots 16, 15, and 14 are situated as a cul-de-sac (semi- circle) with the canal north of Lot 16, east of Lot 15, and south of Lot 14. Lot 14 is across the canal from Mr. Scully's Lot 16. There are five properties on each side of the canal, running west to east. The artificial canal runs directly east from Mr. Patterson’s property for an uncertain distance to the Intracoastal Waterway (ICW). Mr. Patterson’s property (Lot 15) is the western end-point for this canal. Mr. Patterson’s eastern property line (fronting the canal) is 50 feet in width. However, the precise width of the canal between Lots 14 and 16 is unclear. Ms. Smith reports (in her site inspection report of March 3, 2005 (JE 3)) that the canal is approximately 50 feet wide. Mr. Patterson testified that Karen Main with the City of Boynton Beach advised him that the consensus opinion of City employees reviewing the issue was that the canal measured 66 feet in width. There appears to be some widening of the canal east of Mr. Patterson’s property line and then the canal appears to straighten-out as it proceeds to the east to the ICW and past the easterly property lines for Lots 14 and 16. See (JEs 1-site plan; 5-aerial). The weight of the evidence indicates that the canal, between Lots 14 and 16, is approximately 60 to 66 feet wide. See, e.g., id. In the past, the prior owner of Lot 15 (Mr. Patterson's property) moored a boat at and parallel to the marginal dock, which means that the bow, for example, faced Lot 14 and the stern faced Lot 16. Mr. Patterson currently owns a 16-foot boat that he wants to moor at the marginal dock. However, he feels that it is unsafe to do so, particularly if Mr. Scully’s boat drifts. Meloche (Lot 14 to the north) has a fixed boatlift, which allows for the elevation of a boat out of the water, with the bow facing west toward and in front of the northern end of Mr. Patterson’s seawall. (JE 4). Mr. Scully moors his boat parallel to the shoreline of Lot 16 and perpendicular to Mr. Patterson’s 50-foot eastern seawall and property line. (JEs 4 and 6). Mr. Scully’s seawall intersects Mr. Patterson’s seawall such that when Mr. Scully’s 22-foot boat is moored at his seawall, it is also in front of the southern end of Mr. Patterson’s seawall. Id. When Mr. Scully’s boat is tightly moored at his seawall, it does not interfere with or block Mr. Patterson’s marginal dock. (JE 6). However, when Mr. Scully’s boat is loosely moored, it drifts toward the center of the canal in front of Mr. Patterson’s marginal dock. (JE 4). With no boat moored at the marginal dock, Mr. Scully is able to freely maneuver his boat to his seawall with limited “backing” of his boat required (stern first). With a boat consistently moored at Mr. Patterson’s marginal dock, Mr. Scully would have to back into his area beside his seawall in order to avoid colliding with that boat. Mr. Patterson’s finger pier would enable him to safely moor a boat perpendicular to the marginal dock. Centering the finger pier at the marginal dock is likely to make it easier for Mr. Patterson and Mr. Scully to navigate to their respective mooring areas, depending on the size of the boats moored by Mr. Patterson and Mr. Scully. (The Department, in reviewing similar exemption requests, does not consider the type and size of the boat(s) to be moored at the proposed dock or adjacent mooring site.) It is preferable for the boats to be moored, in this location, stern first, with the bow facing down the canal from the wake of the boats traveling in the ICW. Centering the finger pier at the marginal dock and mooring Mr. Patterson’s boat on the north side of the finger pier is likely to enable Meloche, Mr. Patterson, and Mr. Scully to moor their boats parallel to each other and avoid collisions.1 Placement of the finger pier at the northern end of the finger pier, while favored over the proposed location by Mr. Scully, is likely to interfere with Meloche’s use of his property and boatlift. With the finger pier centered on the marginal dock and a boat moored to the north, Mr. Scully can maneuver his boat to his seawall by “backing in” stern first. An experienced boater can accomplish this task in two to three maneuvers. Mr. Scully is an experienced boater and has lived on the canal for approximately eight years. Shortening the finger pier from 16 feet to 11.8 feet will not affect Mr. Patterson’s ability to safely moor a boat on the northern side of the finger pier. The Challenge Mr. Scully contends that the placement of the wooden finger pier and the mooring of a sizable boat on the proposed finger pier will interfere with his ability to navigate in and out of the canal in or around his property, and necessarily interfere with his ability to moor his boat adjacent to his property. He also contends that the marginal dock and the finger pier are two docks, not one. Resolution of the Controversy Replacement of the existing marginal dock will consist of replacing the decking and using the existing pilings. The existing marginal dock is currently functional. Reconstruction of the marginal dock and construction of the finger pier will be done by a licensed marine contractor. The licensed marine contractor will use best management practices to avoid water quality problems in the canal during construction. Construction of the proposed project is not expected to adversely affect flood control or violate water quality standards. The proposed project will not impede navigation. But see Endnote 1.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order concluding that Mr. Patterson’s proposed dock project, as revised, is exempt from the need to obtain an ERP. DONE AND ENTERED this 14th day of April, 2005, in Tallahassee, Leon County, Florida. S CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of April, 2005.

Florida Laws (2) 120.569120.57
# 1
ALAN S. DORRILL vs ROBERT LAVEN, JOHN CLOUD, AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-003988 (1991)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Jun. 25, 1991 Number: 91-003988 Latest Update: Dec. 16, 1991

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: Respondent Laven owns a parcel of land at 1500 Bay View Drive, Sarasota, Florida on which he has a home. The property is approximately 180 feet by 100 feet, and is located on Sarasota Bay. A seawall has been constructed along the shoreline. Respondent Cloud owns a parcel of land at 2610 Cardinal Lane, Sarasota, Florida that is contiguous to Respondent Laven's property at 1500 Bay View Drive, Sarasota, Florida that is also located on Sarasota Bay. Approximately 100 feet of the property is located along the shoreline of Sarasota Bay. Sarasota Bay is currently designated as a Class III outstanding Florida waterbody. On or about June 28, 1991 Respondents Laven/Cloud filed an application to modify existing permit number 581885033 which had been previously issued to Respondent Laven for construction of a private dock consisting of an access pier 210 feet by 5 feet, with a terminal platform 20 feet by 4 feet on Laven's property located at 1500 Bay View Drive, Sarasota, Florida. Previous to the modified application being filed by Laven and Cloud, Laven had attempted to modify permit no. 581885033 by reducing the access pier from 210 feet by 5 feet to 175 feet by 5 feet. The Department concluded that the dock, as modified, would not reach water of sufficient depth to prevent damage to the seagrass, and considered this a major modification requiring a new application. Therefore, the Department denied the modified application, and Respondent Laven did not file a new application. The application filed by Laven/Cloud on or about June 28, 1991 to modify existing permit 581885033 proposed to construct a private dock on the property line between Laven's and Cloud's property. The private dock was proposed to consist of an access pier 4 feet by 210 feet, with two terminal platforms, each 25 feet by 6 feet. After review of the application to modify permit 58188503 the Department issued a Notice of Intent to issue a permit for the proposed construction of the private dock on August 2, 1991. The Notice of Intent included 18 specific conditions to which the proposed dock would be subject. Those relevant to this proceeding are as follows: 1) . . . . If historical or archaeological artifacts, such as Indian canoes, are discovered at any time within the project site the permittee shall immediately notify the district office and the Bureau of Historic Preservation, Division of Archives, History and Records Management, R.A. Gray Building, Tallahassee, Florida 32301. Turbidity screens shall be utilized, secured, and properly maintained during the permitted construction and shall remain in place until any generated turbidity subsides. Double turbidity screens, staked hay bales, staged construction and other additional measures shall be used as necessary to insure compliance with water quality standards in Chapter 17-3, Florida Administrative Code. During construction, all areas of exposed soils shall be effectively isolated from waters of the state to prevent erosion or deposition. All exposed soils shall be stabilized with an appropriate ground cover within 72 hours of attaining final grade. 5) . . . . 6) . . . . The applicant is not permitted to conduct or construct the following activities or facilities in conjunction with this dock structure: Fish cleaning facilities. Fuel hoses or fueling facilities. The mooring of boats or vessels for live aboards. The mooring of boats utilized for com- mercial purposes such as fishing, scuba diving, boat rental, etc. Picnic tables or benches. Storage sheds or enclosed structures. Covered boat slips. Sanitary facilities. The rental of boat slips or mooring space. Turbidity screens shall effectively encom- pass each piling during installation and remain in place until any generated turbidity has subsided. Turbidity screens shall effectively encompass an area around each piling not to exceed 7 square feet. Any watercraft which may be utilized during construction activities shall only operate/moor in waters of sufficient depth so as not to cause bottom scour or prop dredging. The access pier shall be elevated a minimum of 5 feet above mean high water for the most waterward 150 linear feet of the access pier. The most waterward 150 linear feet of the access pier shall be constructed with the slated[sic] design indicated on sheet 4 of permit submittals. The most landward 60 feet of the access pier shall be constructed utilizing the 2 x 6 decking. The permittees shall construct 100 linear feet of rip rap along the existing vertical seawall as indicated on sheet 1 of permit submittals. Rip rap material shall consist of natural boulders or clean concrete rubble six inches to three feet in diameter or in average dimensions. The slope of the rip rap shall be no steeper than 2H:1V. There shall be no reinforcing rods or other similar protrusions in concrete rubble and all rubble or boulders shall be free of attached sediments. The rip rap shall be install concurrently with the construction of the permitted dock. The permittees shall grant the Department a conservation easement over the shorelines of the two subject parcels. A conservation easement shall be established over the seawall cap and 2 feet waterward of the seawall for the entire length of the seawall to 1500 Bay View Drive (Lots 1, 2, 3, 4, 11, 12, 13, and 14 Block Q, Bay View Heights Addition). A conservation easement shall also be established between the limits of the mean high water linear and the landward extent of waters of the State (Pursuant to Section 170301.400[sic] FAC) for the entire length of the shoreline at 2610 Cardinal Place (Lots 5, 6, 7, 8, 15, 16, 17 and 18, Block Q, Bay View Heights Addition). 14) . . . . 15) . . . . The following seagrass monitoring program shall be implemented and adhered to: Within 45 days of the issuance of this permit (and prior to initiation of dock con- struction) the permittee shall establish a preconstruction monitoring program consisting of one meter square grids within the area specified on sheet 1 A of permit attachments. A minimum of 10 random one meter square plots shall be selected within each area A and B and also along the centerline established along the length of the dock. The permittee shall measure percent areal coverage of seagrasses within each plot within the grid system. Each of the plots shall be monitored as specified in above a minimum of two times per year (July and January) over a three year monitoring period subsequent to dock construction. Reports shall include date, water depth, water clarity, species of seagrasses observed, percent areal coverage and representative height of seagrasses within each plot. Moni- toring reports shall be submitted to the Department within 30 days of the monitoring event. The first monitoring event shall occur during the first January or July (which ever occurs first) subsequent to completion of dock construction. Hand railing shall be constructed along the entire length of the access pier (on both sides). The temporary or permanent mooring of watercraft shall only occur at the terminal platform. 18) . . . . By imposing special conditions 3, 4, 8 and 9 it will ensure that the dock construction will have a temporary minimal impact on the water quality, and there will be no permanent water quality impacts as a result of this project. If this permit is not issued, it would be possible for each of the applicants to build an exempt dock on his property which would require two accesses or swaths through the seagrass beds. An exempt dock (500 square feet or less) may result in the dock terminating in seagrass beds and in water of insufficient depth to prevent damage to the seagrass beds or to prevent bottom scour or propeller dredging. The project site consists of a shoreline with a shoal area where Shoal grass (Halodule wrightii) and Turtle grass (Thalassia sp.) are growing, with the Turtle grass being the predominant species to a point further waterward to where there is a significant change in the water depth. Such point being approximately at the termination of the proposed dock. Beyond this point the seagrass beds are scattered. Therefore, any dock shorter than approximately 210 feet would terminate in the main seagrass beds and result in the seagrass beds being routinely disrupted or damaged by power boats. The proposed design of the most waterward 150 linear feet of the deck portion of the proposed dock has less solid surface than a normal deck, and, along with the proposed height of the most waterward 150 linear feet of the proposed dock, would allow substantially more light to penetrate the area and provide sufficient light for healthy existence of the seagrasses. The proposed impacts consists of disturbance of the seagrass beds. Requiring railing along the entire access pier on both sides will preclude mooring of motor craft in the area of the seagrass and in water depths insufficient to prevent damage to the seagrass, and to prevent bottom souring and propeller dredging. Because of the length, height and design of the dock there would be minimal impact, if any, on the seagrass beds. The design of the dock will ensure that the project will not adversely affect the functions being performed in the area intended for the dock. The conservation easement will ensure that a feeding ground for wading birds will be maintained, and along with the dock design will minimize any impacts that the proposed dock will have on the fish and wild life habitats. The construction of the 100 linear feet of rip rap along the existing vertical seawall on Sarasota Bay along Laven's property will reduce scouring and erosion at the base of the seawall, and provide beneficial habitat which will be an improvement of the seawall alone. There may be minimal impacts on recreation in that it may impose some inconvenience for those fishing and those attempting to access the bay for sailing. There may be some minimal impact on navigation in that the proposed dock will entend out approximately 35 feet further than any other existing dock in the area but due to the shallow water in this area boats presently have to travel at a reduced rate of speed, and for this reason the proposed dock would not adversely affect navigation. However, this should be mitigated by requiring lights on the dock as a safety feature. The project will not adversely affect the fishing, or recreational values, or marine productivity in the vicinity of the project. The proposed project will not adversely affect the public health, safety, or welfare or property of others. The proposed dock will be a permanent structure, notwithstanding that regular mainentaince will be required. The Respondents Laven/Cloud have provided reasonable assurances that the proposed project will be clearly in the public interest, notwithstanding the minimal impact it may have on recreation and navigation. Particularly, when all Special Conditions are considered, specifically Special Conditions 12 and 13 pertaining to rip rap along the vertical seawall on Laven's propertry and the granting of the Conservation Easement over both Laven's and Cloud's shoreline.

Recommendation Accordingly, in view of the above Findings of Fact and Conclusions of Law, it is, therefore, recommended that the Department enter a Final Order issuing Permit Number 581885033 to Respondents Robert Laven and John Cloud as set forth in the Department's Intent To Issue dated August 2, 1991 provided that the grant of the subject permit should include the general and specific conditions in the Intent To Issue as well as the condition requiring lights on the dock for safety purposes as set forth in Finding of Fact 20 above. RECOMMENDED this 21st day of November, 1991, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of November, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-3988 The following constitutes my specific rulings pursuant to Section 120- 59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties in the case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Both paragraphs regarding Respondent Cloud's testimony at the hearing go to his credibility as a witness and are not stated as a finding of fact and are therefore rejected. Paragraphs 1 and 2 regarding Rose Poynor's testimony appear to be supported by documents or testimony not received at the hearing and are therefore rejected. Paragraph 3 regarding Rose Poynor's testimony is either immaterial or irrelevant or goes to her credibility as a witness or is supported by facts not in the record. The paragraph regarding Roy R. Lewis' testimony goes to his credibility as a witness and is not a statement of fact. Paragraphs 1 and 2 regarding Robert Patten's testimony is more of a restatement of his testimony than a finding of fact. But in any event, are neither material or relevant. The next to the last paragraph is not supported by the record but see Finding of Fact 20. The last unnumbered paragraph is not supported by the record. See Finding of Fact 24. Rulings on Proposed Findings of Fact Submitted by Respondent Department of Environmental Regulation 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which adopts the proposed findings of fact: 1 (1, 2, 3); 2 (4, 6); 3 (5); 4 (11); 5 (11); 6 (13); 7 (7, 8); 8 (7, 8); 9 (7, 8); 10 (7, 8); 11 (7); 12 (7); 13 (12, 15); 14 (7); 15 (12); 16 (7, 14); 17 (15); 18 (7, 16); 19 (17); 20 (7); 21 (7); 22 (7, 18); 23 (18); 24 (20); 25 (7, 17); 26 (23); 27 (19); 28 (21); 29 (22); 30 (7); 31 (17); 32 (7); 33 (9); 34 (9, 10); 35 (7, 8, 11, 12, 14-22); and 36 (7). Rulings on Proposed Findings of Fact Submitted by Respondents Laven and Cloud Respondents Laven and Cloud have divided their findings into two groups (1) Findings of Fact and (2) Ultimate Findings. Since the Findings of Fact are duplicative of the Ultimate Facts or are only restatements of the witnesses testimony, I will respond only to the Ultimate Facts. 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which adopts the proposed finding of fact: 1 (1); 2 (3); 3 (2); 4 (4, 6); 5 (3); 6 (7, 12); 7 (7, 17, 18); 8 (7); 9 (7); 10 (7, 24); 11 (7, 24); 12 (22); 13 (17); 14 (is a duplication of paragraph 13); 15 (20); 16 (21) and 17 (16). COPIES FURNISHED: Alan S. Dorrill 1726 Floyd Street Sarasota, FL 34239 F. Craig Richardson, Esquire Icard, Merrill, Cullen, Timm, Furen, & Ginsbrug, P.A. 2033 Main Street, Suite 600 Sarasota, FL 34237 Carol Forthman, Esquire Maureen A. Eggert, Certified Legal Intern 2600 Blairstone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (1) 120.57
# 2
GARY PIRTLE vs ROY D. VOSS AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 13-000515 (2013)
Division of Administrative Hearings, Florida Filed:Port St. Lucie, Florida Feb. 12, 2013 Number: 13-000515 Latest Update: Dec. 26, 2013

The Issue The issues to be determined are whether Respondent Roy Voss is entitled to an exemption from the requirement to obtain an Environmental Resource Permit (“ERP”) and entitled to “consent by rule” to use sovereignty submerged lands to install five mooring pilings next to his existing dock in Stuart, Florida.

Findings Of Fact The Parties Petitioner Pirtle is the owner of real property located at 4622 Southeast Boatyard Drive, Stuart, Florida. The property includes a dock that has been operating as a commercial marina for over 20 years. Respondent Voss is the recipient of the authorizations which are challenged by Petitioner. Voss owns the real property located at 4632 Southeast Boatyard Drive, Stuart, Florida, which is located immediately south of Petitioner’s property. Voss has a private dock. The Pirtle and Voss properties are riparian lots on Manatee Pocket, which connects to the St. Lucie River. Both lots have 50 feet of waterfront. The Department is the state agency with the power and duty to regulate construction activities in waters of the state pursuant to chapter 373, Florida Statutes. The Department also serves as staff to the Board of Trustees of the Internal Improvement Trust Fund (“Board of Trustees”) to review and act on certain construction activities on state sovereignty submerged lands under chapter 253. The Pirtle and Voss Docks The Pirtle dock is 101 feet long and is T-shaped. The Pirtle marina operates under a 1991 sovereignty submerged land lease issued by the Board of Trustees. The lease authorizes up to ten boat slips within the leased area. Pirtle has five boat slips on the south side of his dock, which are configured so that boats are moored perpendicular to the dock, usually with their bows pointed toward the Voss dock. The Voss dock is 120 feet long and has an L-shaped waterward end. The “L” extends to the south, away from the Pirtle dock. The Voss dock was built sometime after the Pirtle dock. Voss has moored several boats at his dock, including a 26-foot Grady White with an 8.5-foot beam, a 38-foot boat with a 15-foot beam, and a 42-foot boat a 15-foot beam. The 38-foot and 42-foot boats have each been moored along the north side of the Voss dock (nearest the Pirtle dock) in the past. The parties did not dispute the location of an imaginary “riparian line” running parallel to and generally equidistant between the Pirtle and Voss docks. Before Voss installed the five pilings which are the subject of this case, boats maneuvering into or out of the slips that are on the south side of the Pirtle dock (“the south slips”) often crossed over the riparian line. The Mooring Pilings On August 29, 2012, Voss applied for the authorizations to install five mooring pilings spaced 20 feet apart on the north side of and parallel to his dock. Voss said he intended to use the pilings to moor a new 38-foot boat with a 15-foot beam. Voss could use three pilings to moor a 38-foot boat. The mooring pilings are also farther from Voss's dock than needed to moor a boat with a 15-foot beam. Voss originally proposed to install the pilings on the riparian line. The Department reviewed the proposal and asked Voss to set the pilings back about three feet farther away from the Pirtle dock. The Department issued the authorizations to Voss on October 25, 2012, and he installed the five mooring pilings where the Department directed him to, about three feet inside the riparian line and 20 feet from his dock. The closest distance between the T-shaped end of the Pirtle dock and the nearest mooring piling is about 8.5 feet. Therefore, only boats with a beam (maximum width) less than 8.5 feet can pass this point when attempting to maneuver into or out of the south slips. Pirtle found out about the Voss pilings early in December 2012. He filed his petition for hearing with the Department on December 20, 2012. The timeliness of the petition was not disputed. The authorizations were issued by the Department without first conducting a site inspection to determine what effect the mooring pilings would have on the ability of boats to maneuver into and out of Pirtle’s south slips. After Pirtle filed his petition, four Department employees went to the site in a 21.5-foot boat with a beam of about 7.8 feet. The pilot of the boat, Jason Storrs, had difficulty maneuvering into and out of Pirtle’s south slips and had to be assisted by the other Department employees who stood in the boat and pushed off from the pilings. Without their assistance, the boat would have bumped into the pilings. An inexperienced boater would have greater difficulty attempting to enter or leave one of the south slips. It would be more difficult to maneuver a boat in or out of one of the south slips if Voss had a boat moored along the pilings. In windy and choppy water conditions, a person attempting to maneuver a boat into one of the south slips would risk damage to the boat and possible injury. The proximity of the mooring pilings to the slips on the south side of the Pirtle dock creates an unsafe condition. It is the practice of the Department to treat boating conditions that create a potential for damage to boats and injury to boaters as a “navigational hazard.” Voss's mooring pilings create a navigational hazard. The difficult and unsafe situation created by the mooring pilings would be obvious to boat owners considering whether to lease one of the south slips at the Pirtle marina. The south slips would be unattractive to potential customers of the marina. Pirtle’s ability to operate the south side of his marina is substantially impaired by Voss's pilings.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection deny the exemption and consent by rule. DONE AND ENTERED this 27th day of September, 2013, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of September, 2013.

Florida Laws (7) 120.52120.569120.57120.68253.77373.406403.813 Florida Administrative Code (2) 18-21.00440E-4.051
# 3
GEORGE W. ROBERTS vs. DIXIE COUNTY AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-001448 (1986)
Division of Administrative Hearings, Florida Number: 86-001448 Latest Update: Oct. 30, 1987

Findings Of Fact Based on the stipulations and admissions of the parties, on the exhibits received in evidence, and on the testimony of the witnesses at hearing, I make the following findings of fact. Facts admitted by all parties The water quality standards contained in Rule 17-3.111, Florida Administrative Code will not be violated by this project. There are no aquatic macrophytes located in the area of the proposed project. The proposed project is located within 500 feet of the incorporated municipality of Horseshoe Beach, Florida. The proposed project is located within Class II waters of the State not approved for shellfish harvesting. The project will not adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The proposed project will be of a permanent nature. The project will not adversely affect or will not enhance significant historical or acheological resources under the provisions of Section 267.061, Florida Statutes. The rest of the findings The Applicant, Dixie County, applied for a dredge and fill permit to construct a dock which would expand the existing public dock at Horseshoe Beach. In accordance with the revised plans dated October 23, 1986, the proposed facility would consist of a pier 6 feet wide and 120 feet long designed to accommodate six boat slips, each 30 feet wide and 40 feet long. The boundaries of the boat slips will be demarcated by pilings set 10 feet apart. Four of the boat slips would be primarily for the use of commercial fishing boats and commercial shrimping boats. The other two boat slips (the two slips closest to the land) would be reserved for the exclusive use of recreational and other small vessels. By adding a catwalk 3 or 4 feet wide down the middle of the two slips reserved for recreational vessels, the usefulness of those slips to recreational vessels would be greatly enhanced and the narrowness of the resulting slips would preclude their use by large vessels. Adding the two catwalks would be a minor addition to the proposed project which would greatly enhance the usefulness of the project and at the same time avoid the possibility that large vessels in the two slips closest to the land would impede ingress and egress at the nearby boat lift, boat fueling facility, and boat ramp. Adding a reasonable number of permanent trash or garbage containers would also enhance the usefulness of the proposed project and minimize the possibility of improper disposal of trash and garbage which is generated by the normal use of a dock by fishermen and boaters. The proposed project site is located in the Gulf of Mexico at Horseshoe Beach, Florida, and would extend into the waters of the Gulf, which is a tidally influenced water body adjacent to Dixie County, Florida. The water along the shoreline of the area is shallow for a considerable distance waterward, except where basins and channels have been dredged. The Horseshoe Beach area is relatively unpolluted. The existing public dock at Horseshoe Beach is used primarily by recreational vessels, but there is also extensive commercial fishing and Shrimping boat activity in the area. The project is located at the mouth of a canal with direct access to the Gulf. Several commercial fishhouses operate from the canal bank, which generates extensive commercial boat traffic past the proposed project site. Large numbers of commercial shrimp boats presently dock along the canal that ends near the proposed project site. The proposed project requires no dredging. The only filling required by the proposed project is the placement of pilings into the bottom of the Gulf of Mexico. Even though the plans do not specify whether concrete or wooden pilings will be used, this lack of specificity in the plans is irrelevant. Regardless of what types of pilings are used on this project, the filling activity will not violate the water quality criteria contained in Rule 17- 3.051(1), Florida Administrative Code. The placement of the pilings will not adversely affect the public health, safety, and welfare. Further, the proposed project will not adversely affect any property interests of the Petitioners within the scope of Chapter 403, Florida Statutes. The Gulf bottom in the area of the proposed project has already been disturbed. The presently existing suspension of particulate material in the water column, a natural occurrence in the area of the project, results in low visibility which means that seagrass beds and other marine vegetation, which provide shelter and detrital deposits for fish and other marine resources, will not grow. Coast Guard regulations prohibit commercial fishing vessels from depositing materials into the water within three miles of the coast line. Commercial fishing vessels must prominently display a sticker reciting that regulation and it is the practice of commercial fishing vessels operating in the vicinity of Horseshoe Beach to comply with this Coast Guard no discharge requirement by cleaning nets and scrubbing decks outside the three mile limit. It is not the practice of Commercial fishing vessels to deliberately discharge diesel fuel, fish parts or other material into the water while docked. Further, the limited number of commercial fishing vessels which could dock at the proposed facility at the same time cannot reasonably be expected to create discharges in amounts creating a nuisance, posing any danger to the public health safety or welfare, or violating the water quality criteria contained in Rule 17-3.051(1), Florida Statutes. Although small amounts of diesel fuel can become mixed with bilge water and be discharged by automatic bilge pumps while commercial fishing vessels are docked, there is no evidence that this would be in amounts Sufficient to create a nuisance or violate water quality criteria. To the contrary, notwithstanding a large amount of commercial boat traffic past the proposed site and notwithstanding the fact that large numbers of shrimp boats dock up the canal from the proposed site, the water in the area of the proposed site has remained relatively unpolluted. The proposed project will not affect the normal wind and wave action in the area of the proposed project. Such wind and wave action presently results in free exchange between the waters of the open Gulf and the waters near the shore. This free exchange of waters means that any pollutant discharges in the area of the proposed project will be diluted and rapidly dispersed into the Gulf of Mexico. There will be no measurable difference in the wind and wave action, or in the water exchange, after the proposed project is built. No harmful shoaling or erosion is expected to result from construction of the proposed project. Any docking structure extending out into the Gulf of Mexico will obviously have some effect on navigation in the area of the dock, but there is no evidence that the proposed dock will present a hazard to navigation or any significant interference with customary navigation patterns. The distance between the nearest channel marker and the waterward end of the proposed project is more than 200 feet. The angle of the proposed dock and its Spatial relation to the main Horseshoe Beach turning basin cause no impediment to navigation. The placement of Coast Guard Safety lights on the dock would minimize any potential for impeding navigation or posing a danger to the public health or safety during hours of darkness.

Recommendation Based on all of the foregoing, I recommend that the Department of Environmental Regulation issue a Final Order in this case granting the permit applied for by Dixie County. It is also recommended that the permit be made subject to the following additional conditions: That one or more Coast Guard safety lights be placed on the proposed expansion to the dock; That catwalks be added down the middle of the two most landward of the proposed boat slips; and That a reasonable number of trash or garbage receptacles be permanently located on the proposed expansion to the dock to minimize the possibility of trash and garbage being thrown overboard. DONE AND ENTERED this 30th day of October, 1987, at Tallahassee, Florida. MICHAEL M. PARRISH, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of October, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NO. 86-1448 The following are my specific rulings on all of the proposed findings of fact submitted by all of the parties. The paragraph numbers referred to below are references to the paragraph numbers in the parties' respective proposed recommended orders. Ruling on findings proposed by the Petitioners: Paragraph 1: Accepted. Paragraph 2: Accepted. Paragraph 3: Accepted. Paragraph 4: First sentence is rejected as appearing to be more in the nature of an introduction to a discussion of legal issues than a proposed finding of fact. Second and third sentences are rejected as repetitious Paragraph 5: Entire paragraph rejected as unnecessary speculative generalizations in light of the other evidence in this case. Paragraph 6: Entire paragraph rejected as unnecessary speculative generalizations in light of the other evidence in this case. Paragraph 7: Rejected as contrary to the greater weight of the evidence. Paragraph 8: Entire paragraph is rejected as appearing to be more in the nature of an introduction to a discussion of legal issues than proposed findings of fact. Paragraph 9: Entire paragraph rejected as contrary to the greater weight of the evidence; construction of the dock may be expected to bring about some changes in the nature of the boat traffic in the immediate area, but nothing of the nature or magnitude suggested by these proposed findings. Paragraph 10: Rejected as contrary to the greater weight of the evidence. Paragraph 11: First sentence is rejected as contrary to the greater weight of the evidence. Second sentence is accepted in part and rejected in part. Rejected portion is irrelevant. Third sentence is rejected as irrelevant. Fourth Sentence is accepted. Fifth sentence is rejected as contrary to the greater weight of the evidence and as repetitious Sixth sentence is rejected as contrary to the greater weight of the evidence. Paragraph 12: Entire paragraph rejected as contrary to the greater weight of the evidence. Rulings on findings Proposed by the Respondent: Paragraph 1: Accepted. Paragraph 2: Accepted in substance. Paragraph 3: First two sentences accepted in substance. Last sentence rejected as irrelevant. Paragraph 4: Accepted. Paragraph 5: Accepted. Paragraph 6: Accepted. Paragraph 7: Rejected as unnecessary recitation of opposing party's contentions and not proposed finding of fact. Paragraph 8: Accepted in substance. Paragraph 9: Accepted in substance. Paragraph 10: Accepted. Paragraph 11: Accepted in substance. Paragraph 12: Accepted. Paragraph 13: First sentence accepted in substance. Second sentence accepted in part and rejected in part; rejected portion concerns riparian rights, which are irrelevant to whether this permit should be issued. Paragraph 14: Entire paragraph rejected as irrelevant. Paragraph 15: Accepted in substance. Paragraph 16: Accepted. Paragraph 17: Accepted in substance. COPIES FURNISHED: Frederick M. Bryant, Esquire Moore, Williams & Bryant, P.A. Post Office Box 1169 Tallahassee, Florida 32302 J. Doyle Thomas, Esquire County Attorney Post Office Box 339 Cross City, Florida 32628 Ann Cowles-Fewox, Legal Intern Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Karen Brodeen, Esquire 2600 Blair Stone Road Tallahassee, Florida 32301 Dale Twachtmann, Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (3) 120.5726.012267.061
# 4
OCEAN REEF CLUB, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 87-004660 (1987)
Division of Administrative Hearings, Florida Number: 87-004660 Latest Update: Sep. 20, 1988

Findings Of Fact Ocean Reef Club, Inc., is the developer of certain lands located on the northern end of Key Largo, Monroe County, Florida. The development began as a fishing village in the 1940's and now includes private residences, a marina, and residential docking facilities. Ocean Reef applied in 1982 to DER for a permit to construct a residential docking facility known as Fisherman's Wharf. The facility was to provide a number of parallel docking spaces with an access channel following an existing tidal creek to the northeast connecting to a waterway known as the Harbor House Basin. The permit was issued on October 5, 1984, authorizing construction of a 4-foot wide parallel dock approximately 600-feet long, the dredging of a turning basin through the excavation of approximately 1800 cubic yards of material and the dredging of some 200 cubic yards from an existing tidal creek along a 480 lineal foot length of the creek to a width of 5-feet; all located in No Name Creek, a tidal creek connecting Harbor House Marina to Pumpkin Creek, in Card Sound, Key Largo, Monroe County, Section 11, Township 59 South, Range 41 East. That permit was extended by a letter dated June 10, 1987, and now carries an expiration date of October 5, 1989. The existing permit held by Ocean Reef Club, valid until 1989, would allow the direct dredging of a tidal creek vegetated by seagrasses over a 400- foot length yielding a direct dredging of seagrasses of some 3000 square feet. During the two-year processing time leading to issuance of the permit, Ocean Reef sold a portion of the property comprising the access channel to third parties who now will not grant their permission authorizing channel construction across their property. As a result, in 1987, Petitioner requested a major modification to permit no. 440601649. Although Petitioner attempted to show that its change of plans had been inconsistently processed by DER as a new permit application when DER was obligated to treat it as a modification of a prior permit which would require no new application, processing, or permit, Petitioner was unable to do so. Petitioner's expert professional land surveyor, Joseph Steinocher,, concurred with DER witnesses Kelly Jo Custer and David Bishof that the Ocean Reef plan changes were so significantly altered as to constitute a wholly new project. Steinocher specifically indicated it was a "significant change in that there is no relationship between the two," and Custer, DER's marina permitting specialist, testified that DER's consistently applied policy is to require all such significant permit modifications to be processed de novo as wholly new permit applications because to do otherwise would not be in the public interest. Custer was also qualified as an expert in marine biology and water quality, and from Custer's viewpoint, the changed plans constitute a new and different project for many reasons but primarily because the project impacts on water which have been designated Outstanding Florida Waters (OFW) during the intervening years. The project revision/new permit application plans changed the configuration of the turning basin, providing for a kidney-shaped upland basin with the utilization of an additional portion of No Name Creek, extending Southeasterly toward the entrance of a water body known as Fisherman's Cove. Because the project initially proposed disturbance of wetlands and dredging of mangroves, a mitigation area of some 10,300 square feet was included in the plan. The original proposal called for the straightening of an oxbow in the existing tidal creek and the placement of fill through approximately one-half the reach of the tidal creek to gain access to the dredge area with the fill to be removed after construction. During the processing of the latest permit application, adverse comments were received from DER staff members, and the Petitioner modified the application to eliminate the straightening of the oxbow. The pending proposal involves the construction of 24 boat slips along a floating dock, the installation of boulder rip-rap, and the placement of culverts to allow access to a central island to remain after construction of the docking facility. As a result of prior permit agreements between the parties, Ocean Reef Club had conveyed approximately 730 acres to the State of Florida Board of Trustees of the Internal Improvement Fund by special warranty deed dated March 17, 1982. Petitioner asserted but failed to prove up that all construction involved in the pending proposal is landward of those lands either conveyed by that special warranty deed or otherwise in the control of the State of Florida and in fact would be wholly upon its own property. Even had the private property encapsulation of the construction been established, Petitioner's registered land surveyor admitted that the tidal creek entrance is within the limits of the deed to the State of Florida. Access for the proposed 24-slip facility will be through the existing tidal creek that has water depths ranging from minus 2.2 feet to in excess of minus 8 feet at low tide. The earlier proposal would have required only a small portion of the natural creek to be used by motor boats. The project contemplated in 1984 and the one which is the subject of the present litigation are not comparable either biologically nor legally. It is noted that one condition of the 1984 permit even required navigational barriers to be placed at the mouth of No Name Creek. Accordingly, it is specifically found that the significant plan changes render the pending Ocean Reef permit application truly a new project rather than a minor modification as contemplated by Chapter 17-12 F.A.C. Petitioner also attempted to demonstrate that DER's denial of the new permit application was inconsistent with its issuance of permits for similar marina projects in other locations. Neither these allegedly similar applications, supporting plans therefor, nor permits were offered in evidence for comparison. Moreover, for one reason or another, some of the named projects differed so much from the subject application that one witness, Kenneth L. Eckternacht, expert in hydrographic engineering, physical oceanography, and navigation, characterized the comparison as "apples to monkies." Some projects could only be compared to the applicant's proposal by one similar component, i.e. elimination of, and mitigation with regard to, mangroves. For this reason, Dr. Snedeker's limited testimony in this regard is discounted. Some projects could not be conclusively identified as within OFW. None involved the use of the type of creek system involved in the instant project. Ocean Reef Club also could not show that the current permit denial is inconsistent with the granting of the permit for the project as previously conceived in 1984, and which project cannot now be constructed due to Ocean Reef's sale of certain land to uncooperative third parties. As set forth in the foregoing findings of fact, the two projects are neither biologically nor legally identical or even clearly comparable. Petitioner's assertion that it has proposed special or enhanced mitigation because the existing permit, still valid until 1989 but now impossible to comply with, allows direct dredging of approximately 3,000 square feet while the present permit application, as modified, would not require dredging this 3,000 feet, is rejected. Under the new project plans, the proposed basin will be located immediately adjacent to the existing tidal creek which would provide the navigational access to and from the basin. The connection will be created between the basin and the creek by excavating only 100-150 square feet of mangroves which lie between the creek and the area of the proposed basin. In making the immediately foregoing finding of fact, the testimony of witnesses has been reconciled without imputing any lack of credibility to any of them. Respondent's expert, Kelly Jo Custer, expert in marine biology and water quality and also their agency marina specialist, testified that the cross-hatching on the project plans, if read to scale, confirms the testimony of Petitioner's witnesses that the square footage of mangroves to be removed is 100-150 square feet and that the cross-hatching must take precedence over the raw number copied onto the plans. The wetlands in and around the project site, including No Name Creek, are within an OFW, specifically the Florida Keys Special Waters. The project site is located in North Key Largo, approximately one-half mile north of John Pennekamp State Park within the Atlantic Ocean and adjacent to the Biscayne Bay/Card Sound Aquatic Preserve. All of these waters are Class III surface waters. The marina basin itself will be excavated to a depth of minus four feet mean low water. The 24 proposed boatslips will accommodate moorage of boats as large as 25 feet with a draft of two feet. The marina basin will enhance recreational values and channel, despite its greater depth, and at the inner portions of its several bends. It is also implausible that Petitioner's plans to limit boat size through condominium documents to be enforced through a homeowners association, to install mirrors, signalling devices, and latches at certain points along the creek, and to install tide staffs at creek entrances will prevent potential head-on boat collisions or bottlenecks in No Name Creek. It is equally implausible that these procedures can provide reasonable assurances that there will not be a chronic increase in water turbidity from increased use or damage to biota from propellers and boat impact. The witnesses generally concurred as to the present ecological status of No Name Creek. It contains Cuban shoalweed and turtlegrass scattered with varied density throughout, and especially found in two patches between the proposed basin and the point at which there is a drastic bend or oxbow in the creek. The seagrasses in the creek serve many valuable functions including providing a substrate upon which epiphytes may attach, and providing a source of food and refuge for fish and small invertebrates. Seagrasses also fix carbon which they absorb from the sediments and water column through photosynthesis. Green and red algae found throughout the creek provide habitat and carbon fixing functions similar to that provided by the seagrasses. Corals and sponges are present. Three species of sponge located in the creek are found only in the Florida Keys and nowhere else in the United States. Other creek biota include barnacles and oysters attached to mangrove roots, lobsters, anchovies, needlefish, grunts, mojarres, electric rays, various small fish, and invertebrates. Biological and botanical diversity is an important measure of the creek's rich ecological quality and value. The increased boat use of No Name Creek inherent in this dredging project will adversely affect the quality and diversity of the biota. In a creek of this configuration with mean low tide occurring roughly every 12 hours and NEAP tides approximately every two weeks, direct impact of boat propellers is a certainty. The shallowest parts of the creek tend to be limerock shelves which provide a hospitable substrate for the corals, and which are most susceptible to propeller damage, as are the seagrasses and sponges. Petitioner's assertion through Mr. Castellanos and Dr. Roessler that all boaters can be relied upon to employ tilt motors to best advantage in shallow water so as to avoid overhanging mangrove branches at the creek's edges (shores) and so as to keep their boats within the portion of the channel away from submerged mangrove roots and further can be trusted to proceed slowly enough to allow slow-moving water creatures to escape their propellers is speculative and unrealistically optimistic. Despite all good intentions, the strong currents of this creek and its meandering nature work against the average pleasure boater keeping to the narrow center channel. An even more compelling problem with this project is that increased sustained turbidity from propellers and boat movement within close range of the creek bottom will scour the creek bottom and/or stir up the bottom sediment on a regular basis. Once suspended, bottom particles will be redeposited on the seagrasses, impeding photosynthesis and smothering the sponges and corals. Upon the testimony of Custer, Echternacht, and Skinner, and despite contrary testimony of Roessler and Larsen, it is found that the admittedly strong currents in the creek will not flush the particles sufficiently to alleviate the loose sediment problem, and may actually exacerbate the chronic turbidity problem. Strong currents can create a cyclical situation in which, as the seagrasses die or are uprooted, even more particulate matter is loosened and churned up. Chronic turbidity of No Name Creek has the potential of violating the applicable water quality standards for biological integrity, for turbidity, and for ambient water quality. These impacts will not be offset by Petitioner's creation of 38,100 square feet of new underwater bottom because, although this new area will become vegetated, it will never be as rich or as diverse as the existing bottom. This is also true of the pilings and rip rap in regard to sessile animals/barnacles. Petitioner's plan to replant red mangroves over 10,300 square feet may be sufficient in mitigation of the loss of 100-150 square feet of mangroves by itself (see Finding of Fact 16) but for the foregoing reasons, it does not constitute full mitigation for the new permit application. The project will be of a permanent nature. The project will not adversely affect significant historical and archeological resources.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is recommended that a final order be entered denying the requested permit. DONE and RECOMMENDED this 20th day of September, 1988, at Tallahassee, Florida. ELLA JANE DAVIS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of September, 1988. APPENDIX TO RECOMMENDED ORDER DOAH Case No. 87-4660 The following constitute specific rulings upon the parties' respective proposed findings of fact (PFOF). Petitioner's PFOF: 1, 2, 3, 4, 5, 7, 10, 11, 20, and 25 are accepted. Accepted except for the last sentence which is rejected upon the greater weight of the credible evidence as a whole. Accepted but specifically not adopted as stated because the plan calls for destruction of certain mangroves (100- 150 ft.) and the planting of others as opposed to mere "addition." 6, 9, 12, and 27 are accepted in part and rejected in part. There was a failure of proof by both parties as to whether the Petitioner would or would not be conducting all activities landward of those lands conveyed. Although there is testimony to this effect, none of the surveys introduced nor other competent evidence allow the undersigned to definitely plot the description contained in Exhibit P-9 with respect to the current permit application plans. In any case, the proposals are not dispositive of the material issues in this case. The reservation, if it does apply, supports denial of the permit. See FOF 9. 8, 26, 28, 29, and 32 are rejected as subordinate and unnecessary, and in some cases as mere recitation of testimony or unproved. See next ruling. 13, 14, 15, 16, 17, 18, 19, 21, 22, 30, 31 and 33. Portions of these proposals are accepted in substance as reflected in the FOF. In part, they are rejected as mere recitation of testimony or as subordinate and unnecessary. The remainder is not accepted due to the relative weight of the credible testimony which is reflected in the facts as found. 34-36. Rejected for the reasons set out in FOF 13. Respondent's PFOF 1, 2, 4-6, 9, 11, 14-22, 24-34, 38-43, 48-52, 54, sentence 2 of 57, all except sentence 1 of 59, and 60 are accepted but not necessarily adopted in the interest of space and clarity or because they are cumulative or mere recitations of testimony. 3. Rejected for the reasons set out in FOF 16. Rejected. There was a failure of proof by both parties as to whether the Petitioner would or would not be conducting all activities landward of those lands conveyed. In any case, the proposal is immaterial to the environmental issues dispositive in this case. See FOF 9 and ruling on Petitioner's 6, 9, 12 and 27. Rejected as this was the unproven opinion of Mr. Poppel. No consent judgment is in evidence. 10, 12, and 13. Portions of these proposals are accepted in substance as reflected in the FOF. In part, they are rejected as mere recitation of testimony or as subordinate and unnecessary. The remainder is not accepted due to the relative weight of the credible testimony as reflected as the facts as found. 23, 53, sentence one of 57, and sentence one of 59, are rejected as argument of counsel or statement of position. 35-37, 44-47, 55, 56, 58, and 61-64 are rejected as subordinate, unnecessary or cumulative to the facts as found. COPIES FURNISHED: Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Robert A. Routa, Esquire Post Office Drawer 6506 Tallahassee, Florida 32314-6506 Richard Grosso, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 5
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs JACK V. ORGANO, 11-000245PL (2011)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Jan. 14, 2011 Number: 11-000245PL Latest Update: Nov. 12, 2019

The Issue The issues in these cases are whether Respondent violated sections 489.129(1)(i), 489.129(1)(o), and 489.1425, Florida Statutes (2007 & 2009),1/ and, if so, what discipline should be imposed.

Findings Of Fact At all times material to the administrative complaints, Mr. Organo was licensed as a certified general contractor in the State of Florida, having been issued license number CGC 1512005. At all times material to the administrative complaints, Mr. Organo was the primary qualifying agent for Bennett Marine Contracting and Construction, Inc. (Bennett Marine). On or about September 29, 2007, Jean Walker (Ms. Walker) entered into a contract with Bennett Marine to construct a dock and a tiki hut at 12305 Boat Shell Drive. The contract (the Walker contract) provided that the contractor would make application for a permit from Lee County, Florida. Mr. Organo signed the Walker contract for Bennett Marine. It is undisputed that the Walker contract did not include a written statement explaining Ms. Walker's rights under the Florida Homeowners' Construction Recovery Fund. On October 24, 2007, Bennett Marine applied for a permit to construct the dock. The application was denied October 29, 2007, because the site plan contained the tiki hut. When the tiki hut was removed from the application, the dock permit was approved. Ms. Walker paid Bennett Marine draws on the construction project. The payments were given to Mr. Organo. The payments totaled $9,200. By February 2008, a tiki hut had been constructed on Ms. Walker's property without a permit. Because the tiki hut was built without a permit, and it was in an illegal location, Lee County required that the tiki hut be removed. By April 2008, the tiki hut had been removed, and another tiki hut had been built in its place. Again, no permit was pulled for the tiki hut, and it was placed in an illegal location. Again, Lee County required that the tiki hut be removed. Mr. Organo subcontracted the construction of the tiki hut to Rick Fewell Chickees. Mr. Fewell of Rick Fewell Chickees, a Seminole Indian,2/ applied for a permit to build a tiki hut, but the application was rejected because the plot plan was not to scale, and the tiki hut did not meet the setback requirements from the water. Another tiki hut was built, and, in March 2009, Lee County again cited Ms. Walker for not having a permit for the tiki hut and for not meeting the setback requirements. In 2010, a permit was finally issued for the construction of a tiki hut on Ms. Walker's property. The permit was issued to Ms. Walker. Bennett Marine commenced work on the tiki hut without obtaining a building permit. On January 5, 2010, Bennett Marine entered into a contract with Chris Bevan (Mr. Bevan) to remove an existing dock, uninstall an existing boatlift, construct a dock, construct a tiki hut, and to reinstall the boatlift. The contract (the Bevan contract) required that the contractor obtain a City of Cape Coral building permit. The Bevan contract was signed by Mr. Organo for Bennett Marine. It is undisputed that the Bevan contract did not contain a written statement explaining Mr. Bevan's rights under the Florida Homeowners' Construction Recovery Fund. On March 17, 2010, Bennett Marine showed up on Mr. Bevan's property and commenced work, by knocking down a cantilever dock that was hanging over a seawall, removing old decking from the boatlift, and rough-framing part of the new dock. Bennett Marine worked until approximately March 25, 2010. That was the last that Mr. Bevan heard from Mr. Organo or Bennett Marine. Mr. Organo applied for a building permit for the Bevan contract on April 1, 2010. The permit was approved on April 13, 2010, but it was not issued. On May 14, 2010, the City of Cape Coral placed a stop-work order on the Bevan project. Mr. Bevan applied for an owner-builder permit for the dock construction, and the permit was issued on June 9, 2010. Mr. Bevan completed the dock construction at additional expense.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding that Mr. Organo violated sections 489.129(1)(i), 489.129(o), and 489.1425; imposing a fine of $250 each for the Walker contract and the Bevan contract for a total of $500, for failure to advise the owners of the recovery fund; imposing a fine of $3,000 and placing Mr. Organo on probation for two years for beginning work without a permit for the Walker contract; and imposing a fine of $1,000 and placing Mr. Organo on probation for one year for beginning work on the Bevan contract without a permit with the one-year probation to run concurrently with the probation imposed for the Walker contract. DONE AND ENTERED this 13th day of April, 2011, in Tallahassee, Leon County, Florida. S SUSAN B. HARRELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of April, 2011.

Florida Laws (5) 120.569120.57489.1195489.129489.1425
# 6
MRS. A. K. DOYLE vs. B. W. PEAKE, MILDRED N. PEAKE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-000127 (1983)
Division of Administrative Hearings, Florida Number: 83-000127 Latest Update: Jun. 11, 1984

The Issue This case concerns the issue of whether the Respondents, B. W. and Mildred Peake, should he granted a permit to construct an addition to an existing dock located on the north shore of Old River in Pensacola, Florida. The Petitioner, Mrs. A. K. Doyle, testified on her own behalf and also called as a witness, Mildred N. Peake, one of the applicants. The Petitioner offered no exhibits into evidence. Mr. B. W. Peake testified on behalf of himself and his wife Mildred N. Peake. The Peakes offered and had admitted into evidence Exhibits 1-7. The Department of Environmental Regulation called as witnesses Mark Snowden and Richard Fancher. The Department offered and had admitted Exhibits 1-6. Subsequent to the final hearing, Counsel for the Petitioner and the two Respondents submitted proposed findings of fact and conclusions of law for consideration by the Hearing Officer. To the extent that those proposed findings and conclusions are inconsistent with this order, they were rejected as not being supported by the evidence or as unnecessary to the resolution of this cause.

Findings Of Fact The Respondents, B. W. and Mildred N. Peake, have filed an application for a permit to construct an addition to an existing private pier located on the north shore of Old River, adjacent to Innerarity Point. It will be centered on a lot located at 878 Innerarity Road, Pensacola, Florida. B. W. and Mildred N. Peake are the owners of the property where the existing dock is located. On December 23, 1982, the Department of Environmental Regulation by letter notified the applicants that the Department intended to grant the permit application. The Petitioner, Mrs. A. K. Doyle, filed an objection to the issuance of that permit. Mrs. Doyle's property is adjacent to the eastern boundary of the Peake property. The application, as modified, seeks to extend the existing pier by sixteen (16) feet. The existing pier is five feet wide and approximately 185 feet long. The addition is to be constructed of the same materials used in the existing pier and will rest on treated pine pilings. The purpose of the pier is to allow temporary berthing for two additional sailboats. There will be no fuel pumps or toilets on the pier. The pier will be used for private purposes only and will involve no commercial operation. Upon completion of the addition, the Peake's pier would be approximately 110 feet from the Intercoastal Waterway Channel and will not create a hazard to navigation. The Peakes have obtained approval from the U.S. Army Corps of Engineers to construct the pier extension. They have not obtained consent from the Department of Natural Resources to use the state owned lands beneath the proposed addition. The addition to the pier will total approximately 80 square feet and will require 4 pilings. There is currently an extensive grass bed consisting of Cuban Shoalweed approximately 90 feet from the shoreline. Jetting of pilings for the addition will occur approximately 103 feet from the closest point of this grass bed. The proposed addition will have no significant impact on the existing grass beds. The grassbeds in this area stop growing at the edge of the photic zone or that point at which sunlight can no longer penetrate the water. At this site, this occurs at a depth of 1.5 meters or approximately 4.8 feet. The depth of the water at the site of the proposed addition is from 8 to 10 feet. There are no grasses growing in the immediate area of the project site. The grass beds in the area contain a wide diversity of benthic microinvertebrates. The number of species and density of benthic microinvertebrates were less at the addition site. The proposed addition will not interfere with marine life or destroy marine productivity. The substrate at the immediate project site consists of coarse sand with some fines associated with the sand. During the piling installation, these fines will become suspended in the water, thus creating turbidity. The use of a turbidity screen or control device during construction would limit turbidity to the project site with very temporary, limited violation of water quality. The project will have no deleterious effect on water quality. All boats using the pier will have Coast Guard approved marina heads. These marine heads will not discharge into the waters in the area. Garbage from the boats will be disposed of at the Peake home adjacent to the pier. The pier is presently being used to permanently moor one sailboat.

Recommendation Based upon the foregoing findings of fact and conclusions of law it is, RECOMMENDED: That the Department of Environmental Regulation issue a permit for the applicants, B. W. and Mildred N. Peake, to construct an addition to their existing dock in accordance with the application as modified. The permit should contain all the specific conditions included in the Department's letter of intent dated December 23, 1982. In addition, the necessary approval from the Department of Natural Resources should first be obtained. DONE AND ORDERED this day of April 1984, in Tallahassee, Florida. MARVIN E. CHAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 27th day of April 1984. COPIES FURNISHED: Victoria Tschinkel Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 E. Gary Early, Esquire Division of Administrative Hearings Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Ralph A. Peterson, Esquire Post Office Box 12950 Pensacola, Florida 32576 James M. Wilson, Esquire Post Office Drawer 1832 Pensacola, Florida 32598

Florida Laws (2) 403.087403.088
# 7
EDWARD SCOTT vs LARRY LEWIS AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-000294 (1999)
Division of Administrative Hearings, Florida Filed:Palm Beach Gardens, Florida Jan. 22, 1999 Number: 99-000294 Latest Update: Dec. 13, 1999

The Issue Whether the application of Respondent Lewis for an Environmental Resource Permit to construct a finger pier qualifies for an exemption from the need to obtain such a permit.

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: The Department of Environmental Protection is responsible for administering the provisions of Chapter 373, and it is specifically responsible for issuing permits for the construction of docks in and over surface waters of the State of Florida. Sections 373.019(2); 373.026; and 373.413, Florida Statutes. Mr. Lewis applied to the Department for an environmental resource permit to construct a finger pier extending into a waterway known as Cypress Creek, which is classified as Class III Waters and is located on the Intracoastal Waterway in Palm Beach Gardens, Florida. According to the plans submitted with the application, the finger pier will be three feet wide, will extend thirty-six feet from the bulkhead into Cypress Creek, and will extend approximately twelve feet past the mean low water line. The plans show that the pier will be built on pilings and will consist of 108 square feet of surface area. The finger pier will be used to dock one boat and will be used as a private dock. When Mr. Lewis's application was initially reviewed, the Department assumed that Cypress Creek flowed over state-owned submerged lands. This assumption was reflected in the August 21, 1998, letter from the Department notifying Mr. Lewis that his proposed finger pier qualified for an exemption from the requirement for an environmental resource permit pursuant to Rule 40E-4.051(3)(b), Florida Administrative Code. The Department subsequently learned that Cypress Creek is an artificially created waterway, and, therefore, the land beneath the creek is not state-owned submerged land. Mr. and Mrs. Lewis own fee simple title to Lot 16 in Paradise Point, in Palm Beach Gardens, Florida. Petitioners Douglas Dedo and Kathy Crawford own Lot 17 in Paradise Point. Lot 16 is adjacent to Lot 17 but has no access to Cypress Creek. Mr. Dedo's and Ms. Crawford's predecessor-in-interest in Lot 17 conveyed to Mr. Lewis's predecessor-in-interest an easement over the westernmost twelve feet of Lot 17, "for purposes of ingress and egress to Cypress Creek and for docking purposes." 1/ The property owned by Petitioners Scott and Vicky Porter is Lot 4 of Cypress Creek Point, which abuts the easement on the west side. Mr. Dedo and Ms. Crawford have a marginal dock, that is, a dock which is roughly parallel to the shoreline, extending into Cypress Creek to the east of Mr. Lewis's easement. Mr. and Mrs. Porter have what is known as a "T-dock," extending into Cypress Creek to the west of Mr. Lewis's easement. The Porter's T-dock extends from the retaining wall eighteen feet into Cypress Creek. Water Quality The proposed finger pier will be constructed of wood, which will not adversely affect water quality. However, the proposed finger pier will be built on pilings, and the primary concern regarding the effect of this project on water quality is that the process of driving the pilings for the finger pier causes the sand to lift from the bottom of the waterway, causing turbidity, or cloudiness, in the water. The turbidity will be substantially mitigated for this project because the contractor will use turbidity screens to trap any sediment in the area where the pier is being constructed and around the pilings while they are being driven into the bottom of the creek bed. In order to construct the finger pier, it will be necessary to drastically trim, and probably destroy, two or three young mangroves that are growing on the creek bottom in front of the retaining wall on the western edge of the easement. In addition, it will be necessary to lightly trim a few other young mangroves adjacent to the proposed pier, but these mangroves should not be destroyed. Although mangroves contribute to good water quality, the effect of the destruction of two or three young mangroves on water quality in Cypress Creek would be negligible. Navigation In the area in front of Lot 17, the lot owned by Mr. Dedo and Ms. Crawford and on which Mr. Lewis's easement is located, Cypress Creek flows roughly east-and-west, with the entrance to the Intracoastal Waterway to the east of Lot 17. Just to the west of the easement, in front of Mr. and Mrs. Porter's property, the creek narrows and curves to the south. As a result of the narrowing of Cypress Creek in front of Mr. and Mrs. Porter's property, Mr. Lewis's proposed finger pier will not extend as far into Cypress Creek as the existing T-dock on the Porter's property. 2/ Most of the boats that pass the area where Mr. Lewis proposes to construct the finger pier are twenty-to-thirty feet long and have drafts from one-to-two feet. At mid-tide on May 12, 1999, the water was four feet deep in the center of the channel in Cypress Creek, directly in front of Mr. Lewis's easement. The measurement from waterline- to-waterline in front of the easement was ninety-three feet. The measurement from waterline-to-waterline in front of Mr. and Mrs. Porter's property at mid-tide on May 12, 1999, was sixty- eight feet. In navigating Cypress Creek, boaters curve toward the area where Mr. Lewis's pier will be located and, at low tide, "hug" the Porter's dock because of a shallow area which extends an undetermined distance into the creek from the north bank opposite the Porter's property. The water thirty-six feet from the bulkhead at the location of the proposed pier was four feet deep at low tide, as measured by Petitioner Dedo. At low tide, again as measured by Petitioner Dedo, approximately twenty-two feet of Mr. Lewis's proposed pier would extend over dry land, with approximately fourteen feet of the pier extending over the water. At low tide on May 13, 1999, as measured by Petitioner Scott, Cypress Creek was sixty-four feet wide from waterline-to- waterline in front of the easement. Therefore, boaters would have approximately fifty feet of water in which to navigate past the proposed finger pier. 3/ Flood control The proposed finger pier will not impede water flow through Cypress Creek and, therefore, will not adversely affect flood control. The pilings will be spaced twelve feet apart, and there will be no wave break or baffle or other impediment to water flow attached to the pier. Summary The evidence presented at hearing is sufficient to establish with the requisite degree of certainty that the three- foot by thirty-six-foot finger pier Mr. Lewis proposes to construct on the easement at the western edge of Lot 17 of Paradise Point will not violate water quality standards, impede navigation, or adversely affect flood control.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order finding that the finger pier Larry Lewis proposes to construct on Cypress Creek in Palm Beach Gardens, Florida, is exempt from the requirement that an environmental resource permit be obtained in order to construct such a structure in and over the waters of the State of Florida. DONE AND ENTERED this 26th day of October, 1999, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 26th day of October, 1999.

Florida Laws (6) 120.569120.57373.019373.403373.413403.813 Florida Administrative Code (2) 40E-4.05162-330.200
# 8
RICHARD K. STANDER vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-001028 (1981)
Division of Administrative Hearings, Florida Number: 81-001028 Latest Update: Sep. 22, 1981

Findings Of Fact Richard K. Stander is the owner of Tom's Harbor Key located in the Florida Keys between Duck Key and Grassy Key. Petitioner seeks a permit to construct a private, non-income producing fishing camp for personal acquaintances and guests. The construction includes a wood dock 80 feet long by six feet wide with nine finger piers two feet wide and 15 feet long running from this dock to provide boat slips, and 1350 linear feet of elevated walkway six feet wide running from the dock area across the mangrove area to seven cottages to be constructed on the upland area of Tom's Harbor Key. Piling across the mangrove area will be implanted by hand auger or water-jetted in. If jetted, appropriate turbidity screens will be used. The pilings for the dock will be driven or implanted with a mechanical auger. The Department of Natural Resources reviewed the application and determined that since the proposed project is a private, non-income producing facility, a lease [from DNR] is not presently required. (Exhibit 3) The submerged lands where the dock and boat slips are to be constructed contain patchy turtle grass growth on an open sandy bottom. (Exhibit 4) Construction of the dock and finger pier boat slips as proposed will have no adverse impact on the flora or fauna in the area. The proposed walkway will cover approximately 2400 square feet (0.06A) of wetlands consisting primarily of red and black mangroves. Constructing this walkway over these wetlands will have no adverse effect on the plants other than the pruning which will be needed to keep the walkway clear. The proposed caretaker's house will be built over the wetlands area and it, like the walkway, will be elevated and will have no adverse effect on the plant or animal life. The cottages will be built on the upland area, and they, too, will be built on pilings with the bottom of the structures some ten feet above mean sea level. Petitioner proposes to use dry toilets in these cottages and remove all wastes to the mainland. Accordingly, no waste will be discharged into the waters adjacent to Tom's Harbor Key. Intervenor contends the proposed project is commercial in nature rather than private but presented no evidence to support this contention. Objections to Intervenor's attempts to infer error in the DNR determination made in Exhibit 3 were sustained as not relevant to the issue before this tribunal. Intervenor also inferred that the application was false because Petitioner stated in the application that the pilings would be implanted using a hand auger or water jet, while at the hearing it was learned the dock piling would be driven or implanted with a mechanical auger. This difference was satisfactorily explained by the testimony of the individual who prepared the application. Moreover, the harm to the environment by implanting the dock pilings by driving or mechanical auger would be less than if these pilings were jetted. It is Intervenor's position that because Petitioner erred in stating in the application how the pilings were to be implanted perhaps he erred in other parts of the application, and therefore the application should be returned to Petitioner for resubmission. Tom's Harbor Key is a pristine area accessible only by water. The wetlands adjacent to this site consist of flourishing mangrove forests, and the area is highly productive. Those opposing the permit applied for are residents of Duck Key, a larger key adjacent to Tom's Harbor which is accessible by land, and which, before its development and occupancy, was also a pristine wetland habitat. Although these witnesses opined that the proposed development would have an adverse impact on the marine habitat and on the birds at the site, no factual evidence to support those conclusions was presented.

Florida Laws (1) 90.801
# 9

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.