Findings Of Fact Based upon the evidence adduced at hearing, and the record as a whole, the following Findings of Fact are made: The Request for Proposals Through the issuance and distribution of a Request for Proposal and/or Proposal Submittal Form (RFP), the Department's Region IV solicited the submission of proposals from prospective lessors interested in leasing to the Department office space in an area (more particularly described in the RFP) in Broward County. The RFP contained the following "General Specifications and Requirements," among others: Net square footage required: 9,196 (within plus 3 percent tolerance) measured in accordance with the Standard Method of Space Measurement (Attachment A). NOTE: restrooms and mechanical rooms are not to be included in calculating net rentable square footage. BIDDER RESPONSE: Net square feet available (Space offered must be within the +3 percent required) . . . Space to be located in the County of Broward, Florida depicted in the following boundaries: NORTH: N.W. 2nd Street, N.E. 2nd Street SOUTH: Davie Boulevard EAST: Federal Highway, U.S. 1 WEST: S.W. 4th Avenue, N.W. 7th Avenue (See attached map (Attachment B). ) Proposals (bids) shall be considered responsive if the space is within or abutting the specified boundaries. Space for purpose of this paragraph means the net square footage to be leased. BIDDER RESPONSE: (address of proposed location- mark location on Attachment B also). Include zip code. The offered space represents entire building. percent of the Space to be made available on July 1, 1997 or within 90 days after notification of award of proposal, whichever occurs last. . . . Term of lease: Five (5) years with an option to renew for an additional Five (5) Years. Services: Full Services to be provided by lessor, including utilities, interior and exterior maintenance, recycling services, garbage disposal, janitorial services and supplies as specified in Attachment C. . . . Photographs and Floor Plans: As part of the bidder's submittal, bidders are to provide: A clear photograph or prospectus showing exterior front, sides and rear of the proposed facility. A floor plan to scale . . . showing present configurations with measurements that equate to the net rentable square footage. The final floor plan will be as described in the specifications and as identified through consultation with the Department. BIDDER RESPONSE: Floor Plan and Photograph(s) are included as a part of this proposal. . . . Existing building. The proposed space must be an existing building. To be considered as existing the proposed space must be dry and measurable (capable of being physically measured). To be considered as "Dry and Measurable" the construction area of all floors of the building including bathrooms, basement, mechanical equip- ment rooms, stairways, penthouses, and the like must be enclosed with floor, finished roof and exterior walls with windows and doors installed, so that the interior of the building will remain dry during adverse weather conditions. The areas mentioned must be clearly defined within the building, but are not required to be completed, to allow the actual occupiable (rental) area of the building to be measured at the time of pro- posal submittal. Renovations to bring the facility into compliance with all applicable Federal, State and local codes and regulations and/or to meet the desired arrangements are permitted, if carried out in accordance with prescribed procedures. The facility must comply or be renovated to comply with the requirements for Accessibility by Handicapped Persons as mandated by Chapter 553, Sections 553.501-553.513, Florida Statutes, and the latest Accessibility Requirements manual published by the Department of Community Affairs, (DCA) Florida Board of Building Codes and Stan- dards, as well as the requirements of Public Law 101-336, July 26, 1990 known as the "Americans with Disabilities Act of 1990" Appendix A to Part 36, "Standards for Accessible Design." The Lessor agrees that the de[v]ised premises now conform, or that, prior to Lessee's occupancy, that said premise[s] shall, at the Lessor's expense, be brought into compliance with all specified requirements. (Attachment D). Successful bidder will provide a floor plan including a site plan of the parking areas for ADA review. . . . The RFP contained the following "Space Requirement Criteria," among others: Plans review fees for State leased buildings: Floor plans are to be a joint effort of departmental staff and the successful bidder. The successful bidder is to provide architectural services by a licensed architect to prepare renovation plans per the 1991 Edition of NFPA 101. The final floor plan is subject to department determination and State Fire Marshall review and approval. . . . See floor plan, Attachment H, for suggested configuration of offices and rooms. 5 Offices not to exceed 120 sq. ft. each- 600 net sq/ft 55 Offices not to exceed 64 sq. ft each- 3,520 net sq/ft File Areas- 84 net sq/ft Reception Areas- 300 net sq/ft Conference Room- 550 net sq/ft Storage Areas with floor to ceiling shelves- 180 net sq/ft Copy and Mail Distribution Room- 100 net sq/ft Employee Lounge with sink/cabinets/counter top- 90 net sq/ft Inactive File Room w/open shelves- 2,000 net sq/ft Drug Testing Room*- 100 net sq/ft MIS & Office Automation Terminals and Printers- 255 net sq/ft Firearm Storage- 40 net sq/ft Internal Circulation- 1,377 net sq/ft *Must include: Adjoining restroom, stainless steel sink, viewing window between testing room and restroom, storage shelves and cabinets, and dead bolt lock on testing room. This bathroom is additional to restrooms referenced under "Restrooms" . . . 8. Restrooms: (must meet requirements of Americans with Disability Act of 1990 and the requirements of the Accessibility by Handicapped Persons, Section 553.504(12-13), Florida Statutes- Attachment D): Waterclosets- 1 Men's (Public); 1 Men's (Staff); 1 Women's (Public); 1 Women's (Staff) Urinals- 1 Men's (Public); 1 Men's (Staff) Lavatories w/mirrors- 1 Men's (Public); 1 Men's (Staff); 1 Women's (Public); 1 Women's (Staff) Note: If space is offered on more than one floor, restroom facilities must be provided to code on each floor in conformance with occupancy and code requirements whichever is greater. . . . The RFP contained the following "General Provisions," among others: 2. All bids accepted by the State are subject to the State's terms and conditions and any and all additional terms and conditions submitted by bidders are rejected and shall have no force and effect. . . . 5. All Proposal sheets must be executed and submitted in a sealed and titled envelope, enclosed in an outer envelope. The face of the inner envelope shall contain, in addition to the Department's address . . ., the date and time of the bid opening and the lease number. PROPOSALS NOT SUBMITTED ON THIS PROPOSAL SUBMITTAL FORM SHALL BE REJECTED. All proposals are subject to the conditions specified herein. Those which do not comply with these conditions are subject to rejection. Each proposal shall be signed by the owner(s), corporate officers, or legal representative(s). The corporate, trade, or partnership title must be either stamped or typewritten beside the actual signature(s). . . . The Department agrees to enter into a lease agreement based on submission and accep- tance of the proposal in the best interest of the Department and the State. The Department reserves the right to reject any and all proposals for reason which shall include, but not be limited to, the agency's budgetary constraints; waive any minor infor- mation or technicality in proposals, to accept the proposal deemed to be the lowest and in the best interest of the State, and if necessary, to reinstate procedures for soliciting competitive proposals. . . . Late proposals, modification of proposals, or withdrawal of proposals: Any proposal received at the office designated in the solicitation after the exact time specified for receipt will not be considered and will be returned unopened. A proposal may be withdrawn in person by a proposer or his/her authorized representative provided his/her identity is made known and he/she signs a receipt for the proposal, but only if the withdrawal is made prior to the exact time set for the receipt of proposals. . . . Sealed proposals will be received until 10:00 a.m. on August 21, 1996 by Maria L. Cortes at 3810 Inverrary Blvd., Bldg. C, Suite 101 Conference Room, Lauderhill, FL 33319, at which time all proposals will be publicly opened and read aloud. Notification of award will be made within 30 calendar days and shall be given either by posting the proposal tabulation at the location where the bids were opened or by certified United States mail, return receipt requested. . . . A preproposal conference . . . will be held at 10:00 a.m. on July 17, 1996 at 3810 Inverrary Blvd., Bldg C, Suite 101, Conference Room, Lauder- hill, FL 33319 "Attachment A" to the RFP was the "Standard Method of Space Measurement," which was referenced in the "Net square footage required" provision of the RFP's "General Specifications and Requirements." "Attachment A" read as follows: STANDARD METHOD OF SPACE MEASUREMENT The purpose of this standard is to permit communication and computation on a clear and understandable basis. Another important purpose is to allow comparison of values on the basis of a generally agreed upon unit of measurement (net square footage). It should also be noted that this standard can and should be used in measuring office space in old as well as new buildings, leased office space as well as State-owned office space. It is applicable to any architectural design or type of construction because it is based on the premise that the area being measured is that which the agency may occupy and use for its furnishings and its people. This standard method of measuring office space measures only occupiable space, undistorted by variance in design from one building to another. It measures the area of office building that actually has usable (rental) value and, therefore, as a standard can be used by all parties with confidence and with a clear understanding of what is being measured. Area measurement in office buildings is based in all cases upon the typical floor plans, and barring structural changes which affect materially the typical floor, such measurements stand for the life of the building, regardless of readjustments incident to agency layouts. All usable (rentable) office space, leased or State-owned, shall be computed by: Measuring to the inside finish of permanent outer building walls to the office side of corridors and/or other permanent partitions, and to the center of partitions that separate the premises from adjoining usable areas. This usable (rentable) area shall EXCLUDE: bathrooms, stairs, elevator shafts, flues, pipe shafts, vertical ducts, air-conditioning rooms, fan rooms, janitor closet, electrical closets-- and such other rooms not actually available to the tenant for his furnishings and personnel--- and their enclosing walls. No deductions shall be made for columns and projections necessary to the building. Pre-Proposal Conference A pre-proposal conference was held, as scheduled, to give prospective lessors the opportunity to receive from the Department answers to questions they had regarding the RFP. The Department emphasized to those prospective lessors who attended the pre-proposal conference that, as indicated in the "Net square footage required" provision of the RFP's "General Specifications and Requirements," it would not accept a proposal offering space with a "net square footage" of less than 9,196 square feet. Petitioner did not send a representative to the pre-proposal conference. Petitioner's Proposal Two proposals were submitted in response to the RFP. One of these proposals was submitted by Petitioner, which offered the Department the entire space in a two-story building located at 609 South Andrews Avenue in Fort Lauderdale, Florida (Petitioner's Building). In its proposal, Petitioner indicated that the "net square feet available" in its building was 9,370. Along with its proposal, Petitioner submitted to the Department existing and proposed floor plans. There are currently two restrooms on the first floor of Petitioner's Building and two restrooms on the second floor of the building. None of these restrooms meets the accessibility requirements prescribed in the RFP. It is Petitioner's intention, if it is awarded the lease by the Department, to eliminate these existing restrooms and replace them with restrooms to be constructed adjacent to the existing structure in space that is not now, nor was it at the time of the submission of Petitioner's proposal, "Dry and Measurable," as that term is defined in the "Existing building" provision of the RFP's "General Specifications and Requirements." These intentions of Petitioner's were reflected in the materials Petitioner submitted to the Department along with its proposal. The Department's Initial Evaluation of the Responsiveness of the Two Proposals Douglas Sweredoski is the Facilities Services Manager Assistant for the Department's Region IV. He is a certified real estate appraiser. On or about September 15, 1996, Sweredoski went to Petitioner's Building and measured the dimensions of the building (and certain of its component parts), using an electronic measuring device, to ascertain whether the building had the "net square footage required" by the RFP. Employing the "Standard Method of Space Measurement," Sweredoski reasonably determined that Petitioner's Building had less than the "net square footage required" by the RFP and that therefore Petitioner's proposal was not responsive to the RFP. The other proposal that the Department received was also deemed to be non-responsive (a determination that has not been challenged). The Department's Notice of Rejection of Proposals Having determined that both proposals it had received were materially non-responsive, the Department, by letter dated September 19, 1996, informed Petitioner of the following: This letter is to inform you that the Department of Corrections has determined that it is in the best interest of the State of Florida to reject all bids submitted for the above referenced lease [Lease No. 700:0754]. A new Request for Proposal will be issued soon. This letter constitutes agency action concerning the referenced bid. You have seventy-two (72) hours from receipt of this letter to file a written notice of protest to this action, and ten (10) days after filing such written notice of protest to file a formal written protest. All documents should be addressed to the undersigned at 3810 Inverrary Boulevard, Building C, Suite 101, Lauderhill, Florida 33319. Failure to file a protest within the times prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Petitioner's Protest Petitioner timely protested the Department's decision to reject Petitioner's proposal and to issue a new RFP. Sweredoski's Return to Petitioner's Building On or about October 1, 1996, Sweredoski returned to Petitioner's Building to verify the accuracy of the measurements that he had obtained (using an electronic device) during his earlier visit to the building. On this follow-up visit to the building, Sweredoski used a mechanical device (more specifically, a tape measure) to measure the dimensions of the building (and certain of its component parts). The measurements he obtained during this second visit were "very close" to the measurements he had obtained during his previous visit. Sweredoski, employing (as he had during his earlier visit) the "Standard Method of Space Measurement," reasonably determined that Petitioner's Building had a "net square footage" of 8,731 net square feet (a "gross square footage" of 9,369 square feet minus: 271 square feet for the existing stairway leading from the first to the second floor; 110 square feet for the existing telephone/mechanical closet on the second floor; and 257 square feet for the existing bathrooms on the first and second floors). Referral of Petitioner's Protest to the Division On October 10, 1996, the Department referred Petitioner's protest to the Division.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Corrections enter a final order denying Petitioner's protest of the Department's decision to reject all proposals (including Petitioner's) submitted in response to the Department's request for proposals for Lease No. 700:0754. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 21st day of November, 1996. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 21st day of November, 1996.
The Issue Whether the Florida A&M University's intended action to reject all bids and re-advertise the project to construct "Utilities Improvement-Central Chilled Water Plant, Phase V", known as BR-389, is illegal, arbitrary, dishonest, or fraudulent.
Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: Parties Neel Mechanical Contracting, Inc., is a Georgia corporation authorized to do business in Florida and licensed by the Florida Construction Industry Licensing Board. Its business is air conditioning, and it specializes in larger projects such as the one at issue herein. Robert C. Sullivan is the President of Neel Mechanical. Thomas Gregory Lang is a project manager employed by Neel Mechanical and the chief estimator for Neel Mechanical; Mr. Lang is the person primarily responsible for preparing Neel Mechanical's bid proposal for Project BR-389. The Florida Board of Regents is a corporate body consisting of the Commissioner of Education and thirteen citizens appointed by the Governor and approved by three members of the Cabinet; it is subject to the general supervision and control of the Department of Education. Sections 240.203(2), 240.205, and 240.207(1), Florida Statutes (1999). The Board of Regents is a member of the State University System, is charged generally with overseeing the state universities, and has the authority to approve and execute contracts for "construction for use by a university when the contractual obligation exceeds $1 million." Sections 240.209 and 240.205(6), Florida Statutes (1999). 4/ Florida Agricultural and Mechanical University ("FAMU") is a public university located in Tallahassee, Florida, and is one of ten universities in Florida's State University System. Section 240.2011, Florida Statutes (1999). The university president is the chief administrative officer of the university and is responsible for its operation and administration. Section 240.227, Florida Statutes (1999). At the times material to this proceeding, Frederick S. Humphries was president of FAMU, and Samuel J. Houston was the Director of FAMU's Office of Facilities Planning and Construction. Mr. Houston has primary responsibility for supervising the bid process and the staff that prepared the bid documents and evaluated the bids for Project BR-389. Mr. Houston acts in this capacity on behalf of President Humphries and the Board of Regents. Mr. Houston also is ultimately responsible for the administration of Project BR-389. Bayou Mechanical, Inc. ("Bayou Mechanical") is a mechanical contractor which submitted a bid on Project BR-389. Call for Bids In Volume 25, Number 13, of the Florida Administrative Weekly, dated April 2, 1999, FAMU, on behalf of the Board of Regents, issued a Call for Bids on Project BR-389, which involves construction of a chilled water plant on the FAMU campus. The Call for Bids provided that all bidders must have a valid Florida license to do the work at the time of bid opening and a minimum of five years experience with similar projects. Project BR-389 involves a construction contract and is the fifth phase of the construction of an underground chilled water system on the FAMU campus. The project consists of constructing a portion of the system and connecting it to the existing system. The Call for Bids notified prospective bidders that sealed bids would be received at FAMU on May 4, 1999, until 2:00 p.m., after which time the bids would be opened and the bid tabulations posted. The Call for Bids further provided: "Bids must be submitted in full and in accordance with the requirements of the drawings and Project Manual." The Call for Bids advised that these documents were available at the offices of the Architect/Engineer for the project, Bosek, Gibson & Associates, Inc. ("Bosek, Gibson"), in Tallahassee, Florida. In Addendum #2 to the Project Manual, dated April 30, 1999, the date for submission of bids was changed from May 4, 1999, to May 11, 1999. The Project Manual contains Instructions to Bidders, consisting of pages 6 of 106 through 22 of 106 and dated October 16, 1989; General Conditions of the Contract for Construction, consisting of pages 23 of 106 through 106 of 106 and dated October 16, 1989; Special Conditions of the Contract, consisting of pages I-1 through I-10 and dated October 16, 1989; Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996; Supplement K to the Project Manual, consisting of pages 1 through 5 and identified as the February 1999 Revision; Exhibit L, Supplementary Conditions to the General Conditions of the Contract for Construction, consisting of pages 2 through 16; and the Technical Specifications, which are separately identified and numbered. As noted in the Call for Bids, drawings are also included in the bid documents. Neel Mechanical, Bayou Mechanical, and Council Contracting submitted bids for Project BR-389 on May 11, 1999, the date on which the bids were opened and the price proposals were read. According to the Bid/Proposal Tabulation form that was posted from May 14 through 19, 1999, Neel Mechanical was the apparent low bidder on the base bid and on the two alternates 5/; Neel Mechanical's base bid and its bid on alternates were within FAMU's budget for the project. Bayou Mechanical submitted the second lowest bid on the base bid and the alternates; Bayou Mechanical was within the budget on the base bid but over budget on the alternates. No recommended award or intent to award was indicated on the Bid/Proposal Tabulation form. Shortly after the bids were opened, several issues were raised with respect to the bid process. First, the FAMU staff discovered that Neel Mechanical had failed to affix its corporate seal to the signature page of the bid Proposal Form and to the Bid Bond that was part of the bid submission. Second, York International Company ("York") sent via facsimile on May 11, 1999, a letter advising FAMU's Office of Facilities Planning and Construction that York intended to protest the bid. This letter raised the third issue: Of the two manufacturers identified in the project specifications, York and The Trane Company ("Trane"), only Trane manufactured a chiller that could meet the project specifications. Fourth, Mark A. Daughtery, a project manager for Bayou Mechanical, sent a letter dated May 14, 1999, to Craig Allen at Bosek, Gibson advising him that Bayou Mechanical intended to file a formal protest on Project BR-389 and identifying two issues of concern to Bayou Mechanical: Neel Mechanical's failure to affix its corporate seal to its bid submission and "the Chiller being sole sourced to Trane Company." Each of these issues is discussed in detail below. Corporate Seal The Instructions to Bidders contained in the Project Manual provide: B-16 Preparation and Submission of Bids Each Proposal shall be submitted on the form contained in the Project Manual and bid prices shall be indicated thereon in proper spaces, for the entire Work and for all Alternates. (See B-8) In the event of a discrepancy in the bid amount on the Proposal between the numeric and written quotes, the written amount will govern. Each Proposal must give the full business address of the Bidder and state whether it is an individual, corporation or partnership. Proposals by a corporation must be signed with the legal name and seal of the corporation followed by the name of the state of its incorporation and the manual signature and designation of an officer, agent or other person authorized to bind the corporation. (Emphasis added.) When it was submitted on May 11, 1999, Neel Mechanical's bid did not include the impression of its corporate seal on the bid Proposal Form signature page or on the Bid Bond submitted as part of the proposal. After the bid opening, an employee of Neel Mechanical received a telephone call from Henry Swift, FAMU's Project Manager for Project BR-389, in which he advised Neel Mechanical that its bid had not been sealed. This conversation was followed by a request from Mr. Swift, sent via facsimile transmittal to Neel Mechanical on May 13, 1999, requesting a "Letter of Clarification which confirms your status as a corporation licensed to do business in the State of Florida, registered with the Secretary of State, etc. Finally, please be sure to sign and seal your letter with your corporate seal." A letter to Mr. Swift, dated May 14, 1999, was signed and sealed by Robert C. Sullivan, President of Neel Mechanical. The letter was received in FAMU's Office of Facilities Planning and Construction on May 19, 1999. Shortly after Mr. Sullivan sent the May 14, 1999, letter, Neel Mechanical received another telephone call from Mr. Swift in which he advised Neel Mechanical that the seal needed to be physically affixed to the bid Proposal Form. Peter Lang, a project manager employed by Neel Mechanical, had business in Tallahassee, so Mr. Sullivan asked that he take the seal to Mr. Swift's office and affix it to the bid Proposal Form. When Peter Lang arrived at Mr. Swift's office, someone brought out the file and gave him the bid Proposal Form, and he affixed Neel Mechanical's corporate seal to the signature page of the form. Neel Mechanical's corporate seal was not affixed to the Bid Bond, although the seal of the surety company was on the Bid Bond when the bid was submitted. The Bid Bond was part of Neel Mechanical’s bid submission. FAMU verified on May 13, 1999, that Neel Mechanical was authorized to do business in Florida and held the requisite Florida license to perform the work required by the project. Centrifugal chiller specifications and York's letter of "intent to protest" Section 15685-1 of the Technical Specifications included in the Project Manual contains the specifications for the Centrifugal Chillers - Water Cooled to be installed as part of Project BR-389. Those specifications provide in pertinent part: PART 2 - PRODUCTS MANUFACTURERS Available Manufacturers: Subject to compliance with requirements, provide centrifugal chillers from one of the following: Trane Co., The York Int'l. UNIT DESCRIPTION: * * * Refrigerant: Chiller shall be provided with low pressure refrigerant HCFC-123. The size of the chiller specified for Project BR-389 was 2200 tons. 6/ Lane Jackins is the owner of Applied Mechanical Equipment and is a manufacturer's representative for York. He reviewed the technical specifications for the chiller contained in Part II of Section 15685-1 of the Technical Specifications for Project BR-389 and determined that York could not furnish a chiller that met the specifications. York does not manufacture a chiller of 2200 tons that uses R123 refrigerant, although it uses R123 refrigerant in smaller machines up to 750 tons. The equipment manufactured by York in the 2,000-ton range uses R134A refrigerant, which operates at different pressures than R123. The York equipment using R134A refrigerant is of an entirely different design than that using R123 refrigerant. In addition, York does not manufacture a chiller with the voltage required by the project specifications. Three or four days before the bids were to be submitted, either Mr. Sullivan or Mr. Lang spoke with Mr. Jackins about York's providing Neel Mechanical with a price for the chiller. Mr. Jackins responded that York would not submit a price for the equipment because York did not manufacture a chiller that would meet the technical specifications included in the bid documents. The Instructions to Bidders in the Project Manual provide: B-12 Basis for Bidding - Trade Names For clarity of description and as a standard of comparison, certain equipment and materials have been specified by trade names or manufacturers. To insure a uniform basis for bidding, the Bidder shall base the Proposal on the particular systems, equipment or materials specified and approved substitutes as provided in Paragraph 3.19, Substitutes, of the General Conditions. After bids are received, no equipment or materials will be approved as a substitute for the specified product. Paragraph 3.19 of the General Conditions provides: Substitutions Substitutions for a specified system, product or material may be requested of the Architect/Engineer, and the Architect/Engineer's written approval must be issued as an addendum before substitutions will be allowed. All requests for substitutions must be submitted prior to the opening of bids, and approvals shall be granted no less than seven (7) days prior to the bid date. Substitutions requested after that date will receive no consideration. Substitutions are changes in materials, equipment, methods, or sequences of construction, design, structural systems, mechanical, electrical, air conditioning controls, or other requirements of the Drawings or Specifications. (Emphasis in original.) In the portion dealing with "SPECIFICATIONS AND DRAWINGS," Section 15010 of the Technical Requirements, "MECHANICAL REQUIREMENTS," provides as follows: By submitting a bid for equipment or material other than the "Design Basis Equipment" (i.e., that which is shown on the Contract Drawings), the Contractor: Represents that he has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified and complies with all the requirements set forth in Paragraph 3.19 of the General Conditions; Certifies that the cost data presented is complete and includes all related costs under this Contract but excludes costs under separate contracts, and excludes the Engineer's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; Will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects; and, Certifies that the proposed equipment meets the requirements of the Contract Documents. Neither York nor any prospective bidder on Project BR-389 requested within the time limits specified in Paragraph 3.19 of the General Conditions that a York product be substituted for the chiller specified for Project BR-389. Mr. Lang contacted Craig Allen at Bosek, Gibson a day or two before bids were to be submitted and told Mr. Allen that York was not able to provide a chiller that met the project specifications. According to Mr. Lang, Mr. Allen responded that he "was totally surprised that they [York] didn't have a machine that was going to meet this spec." 7/ Mr. Lang based Neel Mechanical's bid on pricing information it received from Trane, which manufactures a chiller that meets the project specifications. An additional reason Mr. Lang based Neel Mechanical's bid on the Trane equipment was his belief that, all things being equal, FAMU preferred to have Trane equipment installed in Project BR-389 because other chillers installed at FAMU were manufactured by Trane. Mr. Lang believed that the specifications for the chiller had been deliberately drawn to require use of Trane equipment. In a letter dated May 11, 1999, the day the bids for Project BR-389 were submitted and opened, Mr. Jackins notified FAMU's Office of Facilities Planning and Construction that York intended to protest the bid on Project BR-389. Mr. Jackins stated in the letter: The chiller as specified is a flat specification. There is only one manufacturer that will meet the criteria as spelled out in the contract documents. This is not in the best interest of the University System of Florida or the State of Florida. An official protest outlining all the proprietary items will be forthcoming. The letter was sent via facsimile on May 11, 1999, prior to the time the bids were opened. Mr. Jackins believed that the "flat specification" was not in the best interest of the university because it precluded competitive pricing for the chiller. Mr. Sullivan learned on May 11 or May 12, 1999, that York intended to file a bid protest. Believing that Neel Mechanical would be awarded the contract as the apparent low bidder, Mr. Sullivan met with Mr. Jackins and several employees of Neel Mechanical, including Greg Lang, at which time Mr. Sullivan proposed an alternative to York's filing a bid protest. Mr. Sullivan told Mr. Jackins that, in his opinion, the situation could best be handled through a meeting between Neel Mechanical, Mr. Jackins, Mr. Houston, and the project engineers. According to Mr. Sullivan's plan, Mr. Jackins could present York's pricing, and FAMU, with the engineers’ assistance, could decide if they wanted to switch from the equipment specified in the bid documents to York equipment. If FAMU agreed to accept the York equipment, then, if it were awarded the contract, Neel Mechanical would purchase the York equipment rather than the Trane equipment Neel Mechanical had included in its proposal. After some discussion, Mr. Jackins agreed with Mr. Sullivan's proposed solution. Post-bid activity from the perspective of Neel Mechanical Immediately after the bids were opened, Craig Allen, an employee of Bosek, Gibson telephoned Mr. Lang and asked if Neel Mechanical was still happy with its bid. According to Mr. Lang, Mr. Allen stated that "this is a standard practice of mine on bid day to call the apparent low bidder and just make sure that they haven't found some colossal error in their math or whatever that made them low." 8/ Mr. Lang told Mr. Allen that Neel Mechanical was still happy with its bid. After this conversation, Mr. Lang waited for the letter from FAMU awarding the contract to Neel Mechanical. He was not concerned that the award was not made immediately because, in his experience, some time always passed between bid opening and the time the winning bidder received the contract. However, in anticipation of the award of the contract, Neel Mechanical proceeded to talk with subcontractors, to start scheduling the project, and to line up equipment that it would need to purchase for work on the project. Neel Mechanical employees also made several visits to the site of the project. At some point after the bids were opened, Mr. Sullivan heard that the procurement officials at FAMU were discussing with FAMU's legal department the issues of Neel Mechanical's failure to affix the corporate seal to its bid and the ramifications of York’s threatened bid protest. Mr. Sullivan responded by telephoning the office of FAMU's general counsel. He spoke with Faye Boyce about these issues and told her that he considered his failure to affix the corporate seal to Neel Mechanical's bid to be insignificant. He also advised her that he had worked out an arrangement with the representative of York whereby York would withdraw its protest and Neel Mechanical would talk with the engineers about the York chiller so a decision could be made whether they wanted to use the York equipment or stay with the Trane equipment which met the project specifications. In a subsequent telephone conversation with Ms. Boyce, Mr. Sullivan received the impression that she had looked into the issues he had raised in their previous telephone conversation. Mr. Sullivan could not recall Ms. Boyce's exact words, but had the impression from their conversation that the contract award to Neel Mechanical had been approved and that confirmation would be sent out shortly. At some point after Mr. Sullivan's conversation with Ms. Boyce, Greg Lang telephoned Henry Swift to find out the status of the contract award. Mr. Swift told Mr. Lang that, in Mr. Lang's words, "the problem had been reviewed and found to be insignificant, and . . . that the letter of intent to award had already been made." 9/ According to Mr. Lang, Mr. Swift told him that FAMU would notify the bidders of the intent to award the contract to Neel Mechanical. On the basis of this conversation, Mr. Lang believed that Neel Mechanical would receive a letter "just any day." When Neel Mechanical did not receive a letter, Mr. Lang telephoned Mr. Swift again. According to Mr. Lang, Mr. Swift stated that he did not know why the matter was being held up. After this second conversation with Mr. Swift, Mr. Lang telephoned Mr. Houston several times but did not receive a return call. Mr. Lang then wrote a letter to Mr. Houston, dated July 9, 1999, in which he inquired about the status of the contract award: It has now been almost two months since you received bids for this project, and as the low bidder we have still not received notification of your intent to award. We have had several telephone conversations with the attorney representing the regents in this matter, and we were lead [sic] to believe that we would have received information before this time. Please review this matter and call us. If there are outstanding issues which concern you, we would like to know about them and work with you to get them resolved. Post-bid activity from the perspective of FAMU Mr. Houston and members of his staff considered the omission of the corporate seal to be a minor deficiency in Neel Mechanical's bid proposal. Nonetheless, even though Neel Mechanical had been allowed to seal the bid Proposal Form, Mr. Houston asked FAMU's Office of General Counsel to conduct research and determine if the deficiency was one that could be waived. Mr. Houston was not involved in drawing up the technical specifications for Project BR-389; rather, he relied on the project engineers to be familiar with the products to be used in the project. Mr. Houston advised the project engineers that he wanted a competitive bid, and, because the chiller was a major component of the project, he instructed the engineers to prepare specifications that could be met by equipment produced by at least two manufacturers. In a letter dated May 18, 1999, Craig Allen, the engineer at Bosek, Gibson who prepared the specifications for Project BR-389, notified Mr. Houston that he was not aware until the "notice of protest" was received from York that York could not provide a chiller of the required capacity which used R123 refrigerant. Mr. Allen advised Mr. Houston that Mr. Jackins, the York representative, had indicated that he wanted to meet with Mr. Allen to discuss York's chiller selections for the project. A recommendation that the contract be awarded to Neel Mechanical was signed on June 8, 1999, by Phyllis Nottage, the Assistant Director of FAMU's Office of Facilities Planning and Construction; on June 10, 1999, by Mr. Houston; on June 14, 1999, by Louis Murray, an Associate Vice President of FAMU; and on June 14, 1999, by Robert Carroll, a Vice President of FAMU with supervisory authority over the Office of Facilities Planning and Construction. The recommendation was contained in a document entitled "Award of Construction Contract," which provided as follows: On May 11, 1999, bids were received for the above-referenced project within the approved budget for the Base Bid and Alternates One (1) through (2), in the total amount of $3,996,400. The requirements for the Minority Business Enterprise Plan as set forth in the project specifications have been satisfied by the Contractor. The consulting Architect/Engineer and the University Facilities Planning and Construction Office recommend the award of this contract to Neel Mechanical Contractors, Inc. President Humphries signed the Award of Construction Contract on June 17, 1999. The preparation and signing of the Award of Contract form and the preparation of the Letter of Intended Decision were part of the bid review process, but Mr. Houston considered them preliminary, without effect until the final decision on the contract award was made and the bidders were formally advised of FAMU's intended decision with respect to the award of the contract. On June 21, 1999, Mr. Houston received a telephone call from Kenneth Ogletree, Director of the Board of Regents’ Office of Facilities Planning, 10/ in which Mr. Houston was advised that the Board of Regents had received an inquiry from a legislator in reference to Project BR-389 and requesting that Mr. Houston prepare a response to the legislator's inquiry. Mr. Ogletree sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter dated May 28, 1999, from Carey Huff, President of Bayou Mechanical, to Durell Peaden, a member of the Florida House of Representatives and a State Representative from District In the letter, Mr. Huff complained that Neel Mechanical, although apparent low bidder for Project BR-389, had failed to seal the bid Proposal Form and the Bid Bond and that, therefore, Neel Mechanical's bid was non-responsive. Mr. Carey requested that Representative Peaden contact FAMU so that Bayou Mechanical would be awarded the contract for the project as lowest responsive bidder. Mr. Carey stated in his May 28, 1999, letter to Representative Peaden that the college had refused to allow Bayou Mechanical to examine Neel Mechanical's bid but that Mr. Houston had informed them that Neel Mechanical had failed to seal its bid properly. 11/ Mr. Ogletree also sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter from Representative Peaden to Dr. Adam W. Herbert, Chancellor of the State University System. In his letter, Representative Peaden asked that Dr. Herbert look into the matter and "see that all equity was followed in the bid process." In response to the Board of Regents' request that he respond to Representative Peaden's inquiry, Mr. Houston prepared a letter dated June 22, 1999. In this letter, which was directed to Mr. Ogletree, Mr. Houston stated that FAMU wished to award the contract for Project BR-389 to Neel Mechanical as the low bidder on the project. Mr. Houston stated that FAMU considered Neel Mechanical's failure to affix the corporate seal on the bid Proposal Form and the Bid Bond to be a minor discrepancy. Mr. Houston further stated that FAMU's Office of General Counsel agreed with the conclusion regarding the corporate seal issue and recommended that the contract be awarded to Neel Mechanical. Finally, Mr. Houston advised Mr. Ogletree that President Humphries had signed the "Award of Construction Contract" form and that Mr. Houston's office was preparing "Letters of Intended Decision" to be sent to the bidders. The final decision on the contract award had not been made on June 10, 1999, when Mr. Houston signed the recommendation that the contract for Project BR-389 be awarded to Neel Mechanical, nor had it been made on June 22, 1999, when Mr. Houston wrote his letter to Mr. Ogletree. Rather, on June 22, 1999, the issues raised with respect to the bid process for Project BR-389 were still being reviewed by Mr. Houston and his staff and by FAMU's Office of General Counsel. The decision to reject all bids on Project BR-389 was made on June 24, 1999. On that date, Mr. Houston met with Vice President Murray, FAMU's attorney, and the Assistant Director of the Office of Facilities Planning and Construction, and the issues relating to the bidding process for Project BR-389 were reviewed. Mr. Houston identified these issues as Neel Mechanical's failure to seal its bid Proposal Form and its Bid Bond; potential protests from York and from Bayou Mechanical; and the problem relating to the technical specifications for the chiller. Of these issues, Mr. Houston considered the most serious the fact that, of the two manufacturers listed in the bid specifications, only Trane could provide the chiller for Project BR-389. The chiller was a major part of the project, and Mr. Houston wanted at least two sources for the chiller in order to encourage competition so that FAMU would get the lowest possible price for the project. Mr. Houston was also concerned that the specifications for the chiller created a de facto "sole source" bid and that the bid solicitation would, therefore, be illegal because FAMU didn't satisfy the statutory requirements necessary for it to specify that the chiller be purchased from a sole source. 12/ FAMU's attorney advised the participants at the June 24, 1999, meeting that the legal department had found no precedent within the State University System for waiving the requirement in the bid documents that the bid Proposal Form and the Bid Bond be sealed with the bidder's corporate seal. The participants at the meeting considered all of the outstanding issues and decided that it would be in the best interests of FAMU to reject all bids submitted on May 11, 1999, for Project BR-389. After the decision to reject all bids was made, Mr. Houston marked an "X" through the Award of Construction Contract form signed by President Humphries, and he prepared letters notifying the bidders of the intent to reject all bids for Project BR-389. Neel Mechanical's bid protest In a letter to Neel Mechanical dated July 6, 1999, Mr. Houston stated: Bids on the above referenced project were opened May 11, 1999. However, we regret to inform you that all Bids have been rejected as in the best interest of the University. This project is presently being re-advertised in the Florida Administrative Weekly. The University apologizes for the time it has taken to reach this decision. We trust that you will cooperate with our course of action and look forward to receiving a proposal from you at the next opening. Thanks for your continued interest in the State University System's Construction Program. The envelope containing Mr. Houston's July 6, 1999, letter was post-marked July 9, 1999, and the letter was received by Neel Mechanical on Tuesday, July 13, 1999. The Instructions to Bidders in the Project Manual provide: Rejection of Bids The Owner reserves the right to reject any and all bids when in the opinion of the Owner such rejection is in the best interest of the Owner. Paragraph B-1 of the Instructions to Bidders provides that the Board of Regents is the owner of the project. On July 13, 1999, after Neel Mechanical received the letter from Mr. Houston notifying it that all bids on Project BR- 389 had been rejected, Mr. Sullivan and Greg Lang went to Mr. Houston's office to urge him to rescind the decision and award the contract to Neel Mechanical. Mr. Sullivan told Mr. Houston that they felt that the issue regarding the corporate seal was insignificant. At this time, Mr. Sullivan also told Mr. Houston that he and York had reached an agreement whereby York would withdraw its protest and Neel Mechanical would present the York product to the University and let the University decide if it wanted to go with the Trane chiller or switch to a York product. Mr. Sullivan thought that Mr. Houston was sympathetic to Neel Mechanical but that the decision had been made by the administration and the legal department. Mr. Sullivan also got the impression that the decision to reject all bids was based on the corporate seal issue. On July 13, 1999, Neel Mechanical hand-delivered its Notice of Intent to Protest Bid to Samuel J. Houston, Director of the Office of Facilities Planning and Construction at Florida A&M University and to FAMU's Office of General Counsel. There is no dispute that the Notice of Intent to Protest Bid was actually received in Mr. Houston's office on July 13, 1999. On July 23, 1999, Neel Mechanical hand-delivered its Formal Written Protest and Petition for Formal Administrative Proceedings to Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, Florida 32307 and to FAMU's Office of General Counsel. Also on July 23, 1999, a copy of the Formal Written Protest and Petition for Formal Administrative Proceedings was sent by United States Mail to the Board of Regents, Office of General Counsel, 325 West Gaines Street, Suite 1454, Tallahassee, Florida 32399-1950. There is no dispute that the Formal Written Protest and Petition for Formal Administrative Proceedings was actually received in Mr. Houston's office on July 23, 1999. The Instructions to Bidders in the Project Manual dated October 16, 1989, provide: Bid Protest To be considered, a bid protest must be received by the Director, Capital Programs, Florida Board of Regents, 1601 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, as provided in Section 120.53, Florida Statutes. Failure to file a notice of protest in this manner shall constitute a waiver of the Bidder's right to proceedings under Chapter 120, Florida Statutes. * * * B-26 Special Conditions Bidders shall be thoroughly familiar with the Special Conditions and their requirements. (Emphasis added.) Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996, provides in pertinent part: (This supplement revises portions of the Project Manual for State University System projects dated October 16, 1989, and supersedes any other previously issued supplements related to the referenced topics.) Revise the Instructions to Bidders Section of the Project Manual as Follows: * * * Revise Paragraph B-22, Bid Protest, to read as follows: B-22 Bid Protest Any person who is affected adversely by the Board of Regents decision or intended decision shall file with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, a notice of protest in writing within 72 hours, excluding Saturday, Sunday, and State legal holidays, after receipt of the bidding documents if the protest is directed toward the bidding conditions or after the notice of the Board of Regents decision or intended decision on contract award or bid rejection if the protest is directed toward contract award or bid rejection. Thereafter, a formal written protest by petition in compliance with Section 120.53(5), and Section 120.57, F.S., must be filed with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, within ten (10) days after the date the notice of protest was filed. Failure to file a timely notice of protest of [sic] failure to file a timely formal written protest petition shall constitute a waiver of protest proceedings. Any protest filed prior to receipt of the notice of the Board of Regents decision or intended decision will be considered abandoned unless renewed within the time limit provided for protests. (Emphasis added.) Supplement K to the Project Manual, consisting of pages 1 through 5, provides in pertinent part: SUPPLEMENT TO PROJECT MANUAL ISSUED BY FLORIDA A&M UNIVERSITY REGARDING PARAGRAPH B-26, SPECIAL CONDITIONS (February 1999 Revision) B-26 SPECIAL CONDITIONS - This supplement modifies paragraph B-26 by adding and clarifying bidding requirements and instructions. * * * PROTEST PROCEDURES: This paragraph supersedes the paragraph (No. B-22) under the general terms and conditions whereby the notice of intended protests or written formal protests including bonding requirements from bidders must be submitted to: Mr. Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, FL 32307. A bid tabulation with the recommended award(s) will be posted at the address indicated in Paragraph B-26, sub- paragraph 6 (Posting of Bid Tabulation). Any notice of protest or formal written protest to the award or intended award which is filed before the bid tabulation posting is null and void. To be considered, a notice of protest or formal written protest must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to the specifications issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to any amendment issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. (Emphasis added.) The instructions regarding the filing of bid protests in Supplement K supersede the instructions in Supplement J, which is dated February 13, 1996, and in the Instructions to Bidders in the Project Manual, which are dated October 16, 1989. Summary The evidence presented by Neel Mechanical is sufficient to establish that it timely filed its Notice of Intent to Protest and its Formal Written Protest and Petition for Formal Administrative Proceedings by hand-delivering the documents to Mr. Houston, at his office on the FAMU campus. The evidence presented by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that FAMU acted fraudulently, arbitrarily, illegally, or dishonestly in deciding that it was in the best interest of FAMU to reject all of the bids submitted on May 11, 1999, for Project BR-389. First, FAMU's concerns that, by inadvertently including a technical specification that could be met by only one manufacturer, it had limited competition with respect to the chiller to be used in Project BR-389 and had inadvertently put out an illegal "sole source" specification were legitimate concerns. Mr. Houston instructed the engineer who prepared the technical specifications that he wanted the specifications drawn so that at least two manufacturers could provide the product, and the engineer prepared specifications relating to the "available manufacturers" which clearly contemplated that a chiller meeting the technical specifications could be provided by both York and Trane. FAMU did not act arbitrarily when it considered as one factor underlying the decision to reject all bids the lack of precedent in the State University System for waiving the requirement that the bid Proposal Form and Bid Bond carry the corporate seal of a corporate bidder. The evidence submitted by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that the corporate seal issue was ultimately the only or even the major factor on which FAMU's decision to reject all bids was based. Mr. Houston identified the possibility that bid protests would be filed by York and by Bayou Mechanical as factors which FAMU considered in deciding to reject all bids. Nonetheless, the evidence taken as a whole permits the inference that the focus of the concern about the potential bid protests was not on avoiding the protests but on the validity of the issues raised by York and Bayou Mechanical. Accordingly, FAMU did not act arbitrarily when it considered these potential bid protests as one factor contributing to the decision to reject all bids. The evidence presented by Neel Mechanical is not sufficient to establish that the "Award of Contract" form executed by President Humphries on June 17, 1999, or Mr. Houston’s June 22, 1999, letter to Mr. Ogletree bound FAMU to award the contract to Neel Mechanical or that the subsequent decision to reject all bids defeated the purpose of the competitive bidding process.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Agricultural and Mechanical University enter a final order dismissing the Formal Written Protest and Petition for Formal Administrative Proceedings filed by Neel Mechanical Contractors, Inc., and denying Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.595, Florida Statutes. Based on the foregoing Findings of Fact and Conclusions of Law, Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.569(2)(e), Florida Statutes, is denied. DONE AND ENTERED this 12th day of November, 1999, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of November, 1999.
The Issue The issues in this bid protest proceeding are whether the bid of Professional Leasing & Development Corporation on state project, job number 48020-3543, was properly rejected for failure to prequalify to bid on the project; and whether the Department properly rejected the bid failure to: meet disadvantaged business enterprise ("DBE") requirements in soliciting minority subcontractors to work on the project, or make a good faith effort to meet the DBE goals set for this project?
Findings Of Fact Professional Leasing & Development Corporation ("Professional") filed a bid on state project, job number 4802 0-3543, which was opened on January 22, 1986 for work on an intersection in Escambia County. The only other bidder was Edward M. Chadbourne, Inc., which the Department declared the lowest responsible bidder, and which declined to participate in these proceedings after notice. The parties stipulated at the hearing that the bids submitted by both bidders were in due form and were submitted in a timely fashion. The parties also stipulated that the Department posted its bid tabulation on March 3, 1986, designating Chadbourne as the lowest responsible bidder, and a timely protest was filed by Professional following that posting. This job is the first Department of Transportation job on which Professional has submitted a bid. It had not prequalified to bid on the job. Warnings appear on pages one and seven of the bid blank that if the bid amount is greater than $150,000, the contractor must be prequalified. The bid blank clearly states in large print on page 7 that if the contractor is not prequalified and the bid is in excess of $150,000, the bid will be rejected. The bid package submitted by Professional was for a total contract amount of $149,973.68. This amount contained errors in the prices for certain items in the bid. These resulted from Professional's errors in the extension of the unit price for items 300 1 3, tack coat; 5331 2, type s asphaltic concrete; and 5337 1 5, asphaltic concrete friction course. The errors are small, aggregating $76.32. The total amount of the bid, as corrected by the unit prices given by Professional in its bid blank, is $150,050. The bid was rejected by the Department for failure to prequalify. When preparing its bid, Professional made efforts to meet the DBE goal set by the Department of Transportation of 8 percent of the contract amount. It sought bids from two minority businesses for striping, and for guardrail and paved ditches,the second of which was a bid from a women's business enterprise which is not considered in meeting the DBE goal. Additional efforts might have been made to obtain DBE subcontract bids by the other principal in the corporation, William Stubstad, but the testimony at the final hearing did not indicate what those efforts may have been. Neither are they reflected in the bid documents. On the DBE/WBE utilization form number 1 submitted with the bid, Professional listed eight potential subcontractors; the striping subcontractor had been certified by the Department of Transportation as a DBE. Written by hand at the bottom of the form was the statement "no other local DBEs in area." Professional's bid reflected only a 3.2 percent utilization of DBE subcontractors, while the goal set by the Department was 8 percent of the contract amount. Based on this submittal, the Department found inadequate documentation of a good faith effort to meet the DBE goal and rejected the bid. Many other subcontractors are certified as DBEs by the Department for work such as signs, guardrails, landscaping and paved ditches. Professional's bid documents give no evidence that these other firms had been solicited to submit bids.
Recommendation It is recommended that the protest of Professional Leasing and Development Corporation be rejected, and the contract be awarded to Edward M. Chadbourne, Inc. DONE AND ORDERED this 2nd day of April 1986 in Tallahassee, Leon County, Florida. WILLIAM R. DORSEY, JR. Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of April, 1986. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 86-0788BID The following constitute my specific rulings pursuant to Section 120.59(2), Florida Statutes (1985) on the proposed findings of fact submitted by the parties. Rulings on Proposed Findings of Fact Submitted by Petitioner: No proposed findings of fact were submitted. Rulings on Proposed Findings of Fact Submitted by Respondent: Covered in Findings of Fact 1 and 5. First sentence is covered in Findings of Fact 3 and 5; the remainder of the proposed finding is covered in Conclusion of Law 1. Generally covered in Finding of Fact 4. The portion of the proposal dealing with Standard Specifi- cation 2-1, 1986 Edition, is rejected because that section was not placed in evidence at the hearing, nor was leave requested to file that specification after the hearing. Covered in Finding of Fact 5. Covered generally in Conclusions of Law 2 and 3. Covered in Conclusion of Law 6. Rejected on the grounds that Section 2-5.3.2 of the Supplemental Special Provision of the Bid Specifications was not proven at the final hearing, nor was leave requested to file them as an exhibit after the hearing. Covered in Finding of Fact 7. Covered in Finding of Fact 7. The portion of proposal 10 found on page 4 is covered in Finding of Fact 7; the remainder is rejected as cumulative. Covered in Finding of Fact 7. Rejected because there is no evidence in the record concerning the consistency with which the Department requires full compliance with DBE goals, and because no issue was raised in this proceeding by Professional with respect to inconsistency in Department policy, making the finding irrelevant. COPIES FURNISHED: Thomas E. Drawdy Secretary Department of Transportation Hayden Burns Building Tallahassee, Florida 32301 A. J. Spalla, Esquire General Counsel Department of Transportation Hayden Burns Building Tallahassee, Florida 32301 Larry D. Scott, Esquire Department of Transportation Hayden Burns Building Tallahassee, Florida 32301 Harold Pridgen President Professional Leasing & Development Corp. 25 East Nine Mile Road Pensacola, Florida 32514 Edward M. Chadbourne, Inc. 4375 McCoy Drive Pensacola, Florida 32503
The Issue Whether Petitioner's protest challenging the Department of Transportation's Notice of Intent to Award Contract No. E-6A14, FIN Project No. 251999-1-32-01/251999-1-52-01, to A-1 Duran Roofing, Inc., should be sustained in whole or in part.
Findings Of Fact Based upon the evidence adduced at hearing, and the record as a whole, the following findings of fact are made to supplement the stipulations of fact set forth in the parties' Joint Pre-Hearing Stipulation: 3/ The District VI Warehouse. The District VI (District) warehouse is used to store archived records, paper supplies, and surplus equipment. In addition, it houses the District's divers and their gear. The District Warehouse Roof Since at least the time of the first solicitation, the District warehouse roof has had a ponding problem and been in disrepair. The condition of the roof has deteriorated to such an extent that there is now an urgent need to replace it. The current roof has five overflow drains or scuppers. The Department has determined that additional scuppers are necessary to provide adequate drainage. The List of Interested and Prequalified Contractors When the District warehouse roof replacement project was originally advertised in 1997, 25 contractors, including Petitioner, A-1, Zurqui, Grace, ART, and Southern Coast Enterprises, requested that the Department send them information about the project. The Department compiled a list containing these 25 contractors' names, addresses, and telephone and fax numbers. The Department subsequently prequalified each of these 25 contractors. Petitioner Pedro Glaria is Petitioner's president. He is now, and has been since 1981, licensed in the State of Florida as both a general contractor and a professional engineer. Petitioner currently has two contracts with the Department, the dollar values of which are $140,000.00 and $110.00.00. Both contracts were awarded during the summer of 2000. They each require Petitioner to provide "roadside mowing" and "roadside litter pickup" services. Since its incorporation in 1989, Petitioner has had a total of 10 to 12 contracts with the Department, at least one of which involved roofing work. At no time has the Department indicated to Mr. Glaria that it has been dissatisfied with Petitioner's work. The Third Solicitation In the third solicitation, as in the first two solicitations, the District warehouse roof replacement project was advertised as a design-build project (involving both design and construction services). The Notice of Informal Bid (No. 6012DS) that the Department used to solicit bids contained the following "work description," "evaluation criteria," and "project information": Work Description Sealed written bids are requested from licensed roofing contractors, general building contractors, professional architectural engineers or professional consultant services for the purpose of a design-build project consisting of roof replacement for the District warehouse building located at the District office complex, 1000 Northwest 111th Avenue, Miami, Florida. The bidder shall provide all labor, materials, supplies, travel, consultant inspection services, shop drawing reviews to design, and furnish plans and specifications necessary to perform all work required for this project. Evaluation Criteria The Florida Department of Transportation (FDOT) will evaluate the technical bid along with the price bid at the same time. The Department may award this contract to the firm whose proposal meets the needs of the Department as outlined in the technical bid criteria, and to the responsible, responsive bidder submitting the lowest total bid. Technical Bid Will Consist of the Following Experience and qualifications of personnel Plans and specifications. 3). Design Warranty Contract time Price Bid 3). Certified Minority Business Enterprise (CMBE) Participation . . . Project Information ESTIMATED BUDGET AMOUNT: N/A With respect to a protest of the specifications contained in an Invitation to Bid or in a Request for Proposals, the Notice of Protest shall be filed in writing within seventy two (72) hours after the receipt of notice of the project plans and specifications or intended project plans and specifications in an Invitation to Bid or Request for Proposals." A formal written protest stating with particularity the facts and law upon which the protest is based and in substantially the same form as a petition in accordance with Rule 60-4.012, F.A.C., shall be filed within ten (10) days after filing of the notice of protest. The ten (10) day period includes Saturdays, Sundays and Legal Holidays; provided, however, if the last day is a Saturday, Sunday or Legal Holiday the period shall run until the end of the next day which is neither a Saturday, Sunday or Legal Holiday. Any person who files an action protesting an award shall post with the Department, at the time of filing the formal written protest, a bond payable to the Department in the amount equal to one percent (1%) of the Department's estimate of the contract amount for the purchase requested or five thousand dollars ($5,000.00), whichever is less, which bond shall be conditioned upon the payment of all costs which may be adjudged against him in the Administrative hearing in which the action is brought and in any subsequent Appellate Court Proceedings. In lieu of a bond, the Department may accept a cashier's check or money order in the amount of the bond. The protest must be filed with The Department of Transportation, Clerk of Agency Proceedings, 605 Suwannee Street, Tallahassee, Florida 32399-0450 THE DEPARTMENT RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS RECEIVED. Exhibit "A" (Attachment V) to the Notice of Informal Bid was the "Scope of Services for Design Build of Replacement Roof at the District Warehouse Building," Section 2.5(a) of which provided as follows: Bidder shall furnish plans and specifications that comply with the South Florida Building Code, Permits Office of the Department of Management Services, and the State Fire Marshall's Office, including but not limited to the following: The design of the roof shall provide for the installation of overflow drains or scuppers in addition to the existing scuppers to prevent an accumulation of water. Petitioner's technical bid, which was prepared by Mr. Glaria, contained a roof design that did not provide for the installation of the additional scuppers required by Section 2.5(a) of Exhibit "A." In Mr. Glaria's professional opinion, these additional scuppers were unnecessary for the design of the roof to comply with the South Florida Building Code. (Petitioner, however, did not file a protest challenging the bid specifications.) By not incorporating the additional scuppers in its design of the roof, Petitioner was able to submit a price bid lower than it could have offered had its design been in compliance with the requirements of Section 2.5(a) of Exhibit "A." All three members of the Department's Technical Review and Awards Committee found Petitioner's technical bid to be non- responsive because it deviated from the requirements of Section 2.5(a) of Exhibit "A.". Had the Department not rejected the Department's technical bid on the grounds that it was non-responsive, Petitioner would have had an unfair competitive advantage over those bidders whose design of the roof included the additional scuppers required by Section 2.5(a) of Exhibit "A." Petitioner's Formal Protest of the Department's announced intention to contract with A-1 contained the following argument concerning the Department's determination that Petitioner's technical bid did not "comply with design criteria for overflow scuppers": FDOT's Technical Panel determined that SPEC failed to comply with the design criteria for overflow scuppers because SPEC did not provide for additional scuppers. . . . The roof already contains five scuppers. As engineer of this design- build project, SPEC determined that additional scuppers were not necessary for proper drainage of the roof. Rather, the roof only necessitated the installation of crickets between the existing scuppers to facilitate drainage of water between the scuppers. The drawing submitted with SPEC's bid reflects the location of the existing scuppers and the use of the crickets to drain any water on the roof. A-1's drawing reflects the use of additional scuppers, but the location of these additional scuppers cannot assist water drainage as the scuppers are located above the crickets, and therefore above roof level, thereby losing any effectiveness. . . . The additional scuppers provided by A-1 will not prevent the accumulation of water as required by section 2.5 and will only create unnecessary expenditure for FDOT. SPEC's design for the drainage of water from the roof is superior to that of A-1, complies with the requirements of the bidding documents and does not require unnecessary expenditure of funds. Accordingly, SPEC should be awarded the project. The Department's December 17, 1998, Notice of Intent Not to Award (Re: Informal Bid No. 6012DS) stated, in pertinent part, as follows: It is the intent of the Department of Transportation to not award the above Contract. This contract will be re- advertised at a later date. . . . ALL BIDS HAVE BEEN REJECTED On January 4, 1999, Petitioner's attorney, Alejandro Espino, Esquire, sent a letter to Department Assistant General Counsel Brian McGrail, which read as follows: This letter confirms our telephone conversation today wherein you stated that the Florida Department of Transportation ("FDOT") rejected all bids on the above referenced project because FDOT intends to rewrite the specification for the mansard roof wood replacement and because FDOT has no available funding for the project. However, you stated that FDOT will not provide a written explanation to SPEC Incorporated or any other bidder for the rejection of the bids for the project. If you believe that the above is not an accurate summary of our conversation, please contact me at your earliest convenience. Best regards. Mr. McGrail responded to Mr. Espino by letter dated January 4, 1999, which read as follows: I am in receipt of your letter this morning regarding our telephone conversation concerning the captioned matter. In response to your rendition of our conversation, I must clarify that I expressed my understanding that the specifications for the project will be reviewed, which may include the issues raised in the protest about the bid specifications, before any further action will be taken by the Department. However, the Department's decision to reject all bids is due to the unavailability of funding for this contract at the present time. I cannot speak to the future of the project with any degree of certainty, nor represent any to you or your client. This is a matter strictly for District VI to decide, and I am not involved in that decision making process. The Department will defend the decision to reject all bids based on the lack of available funding. I refer your attention to Attachment II of Informal Bid #6012DS, Contractual Obligation, Section 1.10 through 1.13. In particular, Cancellation Privileges, regarding the Department's obligations under the Notice of Informal Bid and subsequent agreement shall be subject to and contingent upon the availability of monies appropriated for this contract. Additionally, I am sure that you are aware that the bid documents clearly and repeatedly state the Department's reservation of rights to reject any and all bids for this bid letting. Based on the foregoing, it is clear that the Department's action in rejecting all bids is appropriate under Florida law, if not required, due to the lack of available funds at the present time. If Spec Inc. intends to p[rotest] the Department's decision to reject all bids, I feel it is my responsibility to advise you that the Department will seek any and all costs and attorney fees to which it may be entitled against the protest bond filed in this case. If however, Spec Inc. decides to withdraw the current protests against the intent to award filed on September 28, 1998, and the rejection of all bids filed on December 22, 1998, the Department will agree to return the protest bond in full. After you have had an opportunity to review this matter with your client, please advise at your earliest convenience how Spec Inc., wishes to proceed. Thank you for your cooperation in this matter. I look forward to a prompt response, as the hearing date is approaching rapidly. Mr. Glaria "realized that [Petitioner was] going to have a hard time [in its bid protest] to overcome the issue of lack of funding." In addition, he had the "hope that [Petitioner] would [have the opportunity to] bid the project again for the fourth time." Accordingly, he authorized Mr. Espino to file, on behalf of Petitioner, the following Notice of Voluntary of Dismissal of Formal Protest, dated January 11, 1999: Petitioner, SPEC Incorporated, hereby withdraws its formal protest, dated October 18, 1998, of the Florida Department of Transportation's notice of intent to award Informal Bid No. 6012DS, Financial Project Nos. 2519993201/25199915201, Dade County, to A-1 Duran Roofing, Inc. Upon agreement of counsel for the parties, SPEC Incorporated's bid protest bond will be returned to it. Mr. Espino, in addition, sent the following letter, dated January 11, 1999, to Mr. McGrail: Based on the Florida Department of Transportation's ("FDOT") representation that it rejected all bids for Informal Bid No. 6012DS, Financial Project Nos. 2519993201/25199915201, Dade County, because of the unavailability of funds and because of necessary amendments to the project specifications, SPEC Incorporated hereby withdraws its formal protest of FDOT's notice of intent to reject all bids. As we discussed earlier, FDOT will return SPEC Incorporated's protest bond thirty days after FDOT files . . . the final order in this matter. If you have any questions or comments, please do not hesitate to contact me. Fourth Solicitation The Project is funded through appropriations made by the Legislature in the fixed capital outlay category. 4/ Fixed capital outlay funds are subject to reversion if not obligated (through the execution of a contact or the issuance of a notice of intent to award a contract) within 19 months of their appropriation by the Legislature. In mid-January of 2001, Brenda Garner, the manager of the Department's Fixed Capital Outlay Program, advised Ms. Lyons that, if not obligated by February 1, 2001, a portion of the funds ($45,000.00) appropriated for the Project would revert. Ms. Lyons (who had not been involved, as the District's contract administrator, in the first three solicitations) quickly proceeded (in a day's time) to assemble the documents needed to solicit bids for the Project. These documents included detailed plans and specifications that the District's senior structural engineer and senior project manager had prepared, at Ms. Lyons' request, following the third solicitation, as well as "boilerplate" that the Department uses for non-design-build fixed capital outlay projects like the Project. Ms. Lyons determined that it was unnecessary to advertise for bids and that the Department only needed to solicit bids from three contractors. She selected these three contractors from the list of interested and prequalified contractors that the Department had compiled in the first solicitation. As Ms. Lyons was aware, each of the three contractors she selected (A-1, Zurqui, and Grace) was a Certified Minority Business Enterprise (MBE). She intentionally selected MBE contractors because the District was "trying to meet an MBE goal." Ms. Lyons had some professional familiarity with the three MBE contractors she selected. A-1 had just completed another roofing project for the District, and Zurqui and Grace were performing construction work at the District office complex. Ms. Lyons' decision to not include Petitioner among the three contractors asked to submit bids was not made in bad faith. Inasmuch as the Department was "in a big hurry to get that project done" she did not ask more than three contractors to submit bids. Ms. Lyons required each of the three contractors to first provide proof that it was a licensed general contractor qualified to work on the Project. After receiving such proof, Ms. Lyons then asked the three contractors to bid on the Project. A-1, Zurqui, and Grace submitted their bids on January 25, 2001. The Technical Review and Awards Committee met on January 26, 2001, to review the bids. All three bids were deemed to be responsive. A-1's bid of $58,300.00 was the lowest of the three bids. Neither Zurqui nor Grace protested the Department's proposed decision, announced in its January 26, 2001, Notice of Intent to Award, to award the contract for the Project to A-1. Only Petitioner, which had not been invited to submit a bid and had first learned of the fourth solicitation when Mr. Glaria saw the Notice of Intent to Award while at the District office complex on January 26, 2001, filed a protest.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department issue a final order rejecting in its entirety Petitioner's protest of the Department's announced intention to award Contract E-6A14 to A-1. DONE AND ENTERED this 5th day of June, 2001, in Tallahassee, Leon County, Florida. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of June, 2001.
Findings Of Fact In July, 1989 the District published its request for bids (number 8980) for an atomic absorption spetrophotometer in local newspapers and to prospective interested parties, as shown in joint Exhibit 1 in evidence. The specifications for the instrument were included in the bid package and were authored by Mark Rials, the District's Laboratory Supervisor. The District received two bids for the instrument in response to the request for bids, one from Varian for approximately $57,000 and one from Perkin-Elmer for approximately $59,900. Mark Rials evaluated the bids. Upon evaluation it was determined that the Varian instrument proposal did not meet bid specifications in three major areas. The specifications required a system capacity of 40 megabytes, hard drive capability. The capacity offered by Varian in its bid was for 20 megabytes. The specifications required a combination of a 5 1/4 inch disk drive for its computer system as well as a 3 1/2 inch disk drive. Varian only bid the 3 1/2 inch diskdrive. It did not offer the 5 1/4 inch disk drive which was required. Additionally, at item IX of the specifications, the District required that a list be submitted with the bid which stated, on an item-by-item basis, how the instrument met or exceeded the specifications. Each item in the specifications had been carefully selected to insure optimum performance for the laboratory so that exceptions to the specifications were required to be noted and attached in the bid response. Varian failed to conform to this item of the specifications. This item allowed a vendor to describe in its bid response how it could differently meet the specifications in a better manner or even exceed the specifications, but Varian failed to provide this itemized list. It was also determined that the Varian bid did not conform with the specifications of item IV page 4 of the invitation to bid document concerning the provision of service manuals, system and application software documentation, methods, manuals, parts catalogs, supplies, accessories, catalog, and training manuals. Conversely, it was determined that the Perkin-Elmer bid was responsive in all respects, met the bid specification in these major categories and was the most responsive bidder. After witness Rials conducted the evaluation of the bids, in terms of compliance with the specifications, he and the District determined that the Perkin-Elmer bid was the lowest, responsive bidder which met all specifications. It duly published the intended award and notified all bidders of the bid results. In this evaluation and award process it was demonstrated that the District followed all applicable procedures in its rules and policies concerning evaluation and award. Varian timely filed an objection to the award of the bid; and in accordance with its normal bid protest procedures, the District scheduled a conference between representatives of Varian and District representatives to review Varian's bid. Varian made several statements at that meeting which constituted a substantial deviation from the bid package it had earlier submitted and amounted to an attempted restructuring of its bid in an effort to meet bid specifications. The District declined to countenance this effort and adhered to its initial intent to reject the bid which was submitted by Varian and to not allow the attempted material deviations to be ascribed to Varian's bid, after the point of bid opening and announcement of award. In summary, based upon the bid specifications issued by the District the evaluator's determination concerning the specifications that the evaluator drafted was that the Varian instrument failed to meet bid specifications because of the major deficiencies in the areas found above, regarding systems capacity, computer disk drive availability, and specification response. It has clearly been demonstrated by competent substantial evidence that the District's decision to reject Varian's bid was a reasonable one. It was based solely on a fair comparison of the response of the two bids to the specifications contained in the invitation to bid and notice to all potential vendors. In consideration of the facts established by the evidence in this record, it is found that the bid by Perkin-Elmer substantially met all bid requirements or specifications, even though the Perkin-Elmer bid was the second low bidder in terms of dollar cost. Since the low-cost bidder, Varian, failed to meet major bid specifications, the facts demonstrate that the Perkin-Elmer bid was the most responsive of the two bids at issue and is, therefore, the best bid. Consequently, award should be given to the Perkin-Elmer bid for the instrument in question.
Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence of record, the candor and demeanor of the witnesses, and the pleading and arguments of the parties it is therefore RECOMMENDED: That the Southwest Florida Water Management District issue a final order denying the petition filed by Varian Instrument Group and awarding bid number 8980 to Perkin-Elmer Corporation, as the lowest, responsive bidder. DONE and ENTERED this 6th day of February, 1990, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of February, 1990. APPENDIX Respondent's Proposed Findings of Fact 1-9 are accepted. Petitioner Filed No Proposed Findings of Fact. COPIES FURNISHED: Mr. Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899 Mickey McAllister District Sales Manager Varian Instrument Group 505 Julie Rivers Road, Suite 150 Sugar Land, TX 77478 A. Wayne Alfieri, Esquire Edward B. Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899
Findings Of Fact At all times pertinent to the issues herein, the Department of Transportation, Department), was the state agency responsible for the construction and maintenance of public funded highways within this state not otherwise maintained by federal, county or local government instrumentalities. On or about February 24, 1994, the Department indicated its intention to reject all bids in the two procurements pertinent to the issues herein on the basis that every bid received, from several bidders, exceeded its official cost estimate prepared as a part of the procurement process. This is consistent with a Department policy, itself consistent with statute, to reject all bids on a particular procurement, if the lowest bid received is for a sum greater than the Department's official cost estimate plus 15 percent. Leamington's bids in both procurement actions were rejected for the additional reason that it was not a responsible bidder since it had been declared in default on other state projects. By letter dated March 2, 1994, filed in each procurement in issue here, Leamington formally protested its rejection by the Department for the stated non-responsive, (default), grounds. Leamington's protests made no reference to the rejection of all bids. The matters were referred for formal hearing on the protests and were subsequently set for hearing on April 4, 1994. On March 31, 1994, pursuant to direction by the Hearing Officer, Thomas H. Duffy, counsel for the Department, contacted John Hummel, Leamington's President, to confirm the hearing time and location and, if possible, to agree upon the terms of a pre-hearing stipulation. During that conversation, Mr. Hummel indicated his intention to be present at the scheduled hearing. He also indicated to Mr. Duffy his dissatisfaction with the Department's procurement procedures and his intention to bid on and file protests on as many Department procurements as he could in order to disrupt the Department's procurement operations. Mr. Hummel did not appear at the protest hearing at the scheduled time nor any time thereafter. The hearing was postponed an additional fifteen minutes to allow him ample time to appear. He also did not advise the Hearing Office of his intention not to appear before the hearing, nor did he contact the Hearing Officer thereafter with any reason for his nonappearance. At the hearing, counsel for the Department advised he had received a facsimile notice from Mr. Hummel withdrawing Leamington's protest in both protest cases. Thereafter, the undersigned entered a Recommended Order on the procurement issues recommending approval of the procurement action taken by the Department in each case. A Final Order on those matters has not, as of the date of this Final Order, been issued by the Department. Leamington has also filed bids in several other Department procurements. In some, it failed to post the required bid bonds and in others, failed to be pre-qualified as required due to the amount involved in the bids. Its bids were unusually similar even though the procurements were different, raising the inference that the bids were not serious but made only as a predicate for a disruptive, frivolous protest action. At no time did a representative from Leamington appear to present evidence in support of its protests. To the contrary, Leamington's actions appear to establish a pattern of harassment and abuse of the procurement process consistent with Mr. Hummel's stated intention. Thomas Duffy, counsel for the Department during the period leading up to and for the hearing on Leamington's pertinent protests, expended 26.4 hours in preparation for that hearing. He estimates the fair market value of his time as an attorney at $100.00 per hour. This estimate appears reasonable. Waldemar H. Clark, Jr., the Department's District Contracts Attorney, expended approximately 6.25 hours on the two procurements involved here. He estimates the fair value of his time as an attorney as $30.20 per hour for a total cost of $189.31. This estimate appears reasonable but somewhat low. Edward C. Thompson, the Department's District Contract Administrator expended 1.75 hours on the instant procurements and estimates the value of his time at $26.04 per hour for a total cost of $45.57. This appears reasonable. Richard A. Marino, an employee of the Department's Maintenance Contracts section expended a total of $555.90 in travel expenses and hearing preparation time. His breakdown of expenses appears reasonable. A.J. Spalla, an attorney in private practice in Tallahassee who previously worked for the Department of Transportation, and an expert regarding reasonableness of attorney's fees evaluated the matter in issue here and concluded that a reasonable attorney's fee for legal services rendered by the staff attorneys for the Department in this matter would be $4,000.00. Paul Martin, also an attorney, and currently an Assistant Attorney General opines that $2,000.00 would be a reasonable attorney's fee for the work done for the Department in this case. The combination of $2,829.31 for both attorneys involved in this matter on behalf of the Department is well within the range of estimates by the Department's experts. No evidence to contradict these estimates was presented, and it is found that the estimated amounts are reasonable. The other expenses are, as well, reasonable.
The Issue Whether the Department of Transportation’s decision to reject all bids for Financial Project No. 209278-1-52-01 (J. Turner Butler Blvd.) a major interchange in Duval County, Florida, was exercised illegally, arbitrarily, dishonestly or fraudulently.
Findings Of Fact On April 1, 2004, the Department of Transportation advertised its Bid Solicitation Notice (BSN), for the JTB Project. H. W. Lochner, Inc. (Lochner) designed the JTB Project. Petitioner, Superior Construction, and Archer Western Contractors, LTD, submitted bids on May 26, 2004. Petitioner had the apparent low bid, and Superior had the second apparent low bid. On or about May 27, 2004, Robert Burleson, President of the Florida Transportation Builders Association (“FTBA”), contacted the State Construction Engineer, Ananth Prasad, P.E., and alerted him to potential issues regarding MOT phasing. (T. p. 876, lines 18-24; p. 880, lines 14, 15). Richard Ayers, of Superior Construction, called the Jacksonville Urban Office of the Department of Transportation, District 2, alerting the District to the concerns regarding the maintenance of traffic issues. Ayers had reviewed the bid and plans generally to assess its bid in light of the Petitioner's bid, and had discovered in the process MOT issues that he believed would add substantially to the costs and time required to construct the project. As a result of these calls, Robert Hansgen, P.E., District 2 Resident Engineer, was directed by someone within the Department to review the MOT plans. On June 1, 2004, Mr. Hansgen forwarded to Henry Haggerty and Al Moyle a memorandum outlining seven areas of MOT concern relating to the "constructability" and safety of the JTB project. On June 1, 2004, Hansgen's memorandum was forwarded to Mohammed Majboor, P.E., Design Consultant Engineer for the Department, who forwarded the memo to Lochner. Lochner reviewed its plans in light of the Hansgen memorandum and forwarded its response on June 3, 2004, to Hansgen, who reviewed the responses and added his comments. He e-mailed Henry Haggarty seven concerns he had with the MOT plans. On June 2, 2004, Allen Moyle, Jacksonville Construction Engineer, received Hansgen's and Lochner's responses regarding the MOT plans and determined that the project plans needed revisions because of safety issues. Moyle concluded that all the bids needed to be rejected in light of the MOT revisions. He transmitted a request to Cathy Thomas at the Department's headquarters to arrange a meeting with Lochner to commence revision of the plans at the earliest possible date. On June 8, 2004, Hansgen briefed the District 2 Secretary, Schroeder, and other District 2 staff members on the issues regarding maintenance of traffic issues based on his memo, a marked-up copy of the MOT sheets, and pictures. Rejection of all bids was discussed at this meeting. Mr. Hansgen testified at the formal hearing concerning his findings and his actions with the aid of the original memorandum and Respondent's Exhibits 1 and 2. Mr. Hansgen's concerns were about safety issues and included the reduction of traffic lane widths in areas to 11 feet where barrier walls would be erected on both the inside and outside medians where traffic would be traveling at 55 miles per hour. Another concern was the length of these lanes that would be restricted by concrete barriers. These barriers prevented easy access of emergency vehicles in these areas, which presented a significant hazard at this interchange, which accesses a major hospital complex. Mr. Hansgen’s also identified an inconsistency regarding where the contractor could work in an area close to the barrier wall; a portion of the roadway where a cross slope or tilting of the traveling lane created dangerous vehicle control issues; and plans to widen a portion of the roadway while vehicles traveled on the same portion of roadway which would require further narrowing of lanes. Because the State of Florida has one of the highest fatality records in the nation in work zones, the Department is very concerned about this issue. After the meeting on June 2, 2004, the Jacksonville Urban Office for District 2 recommended rejection to DOT in Tallahassee of all bids based on the need to “clarify uncertainties within the phasing of the maintenance of traffic (MOT) plans.” The recommendation of District 2 was reviewed by the Technical Review Committee, which is comprised of six voting members. On June 9, 2004, the Technical Review Committee recommended rejection of all bids on the JTB Project to the Contract Awards Committee based upon MOT safety issues. The Contracts Award Committee, composed of three voting members, met on June 15, 2004, to consider the recommendations regarding the JTB Project of the Technical Review Committee and District 2. The Contracts Award Committee concurred with the recommendations of the Technical Review Committee and District 2 and rejected all bids based upon MOT safety issues. The Department posted its notice of intent to reject all bids on June 17, 2004. The Petitioner filed a Notice of Intent to Protest the Department’s rejection of all bids with a Formal Written Protest, filed on July 1, 2004, including an appropriate protest bond. The Department’s engineers met with engineers from H.W. Lochner, Inc., to discuss the issues of concern raised in the Hansgen memorandum. The Department commissioned Lochner to revise the plans to enhance the safety features for MOT, and certain other enhancements. Lochner and the Department entered into Supplement Agreement #13 that included both the requested enhancements and the changes to accommodate the concerns referenced in the Hansgen Memorandum. Richard Kelly testified regarding “animus,” and “dislike” displayed by employees of the Department. He pointed to past decisions and actions of Department employees as proof of “dislike” and “animus." These included a Letter of Concern to the Petitioner, on April 16, 2004, from the Department outlining five areas the Department had identified as important in making a determination on the pre-qualification of the Petitioner for bidding on Department contracts for the 2004-2005 fiscal year. Also mentioned were disputed issues between the Department and the Petitioner arising during construction of the I-95/I295 Interchange Project, including Jacksonville ordinances on noise ordinance, and trees and deficiency letters from the Department to AMEC Civil. In addition, the disqualification of Morse Diesel, LLC, as the Petitioner was formerly named, from bidding on construction contracts with the State of Florida, and in 2002, the revocation of the pre-qualification of the Petitioner to bid on DOT projects were described. Ananth Prasad, P.E., who was identified by the Petitioner's witnesses as a primary source to opposition to the Petitioner, testified that he did not hold the position of State Construction Engineer in 2000, and was not involved in the decision to deny pre-qualification of Morse Diesel. Mr. Prasad also was not involved with the initial decision to revoke the pre-qualification of AMEC in 2002. Mr. Prasad does not personally hold a position on the Technical Review Committee. Mr. Prasad did not vote on the decision to recommend rejection of all bids on the JTB project. The decision to reject all bids for the JTB Project was made by the Contracts Award Committee based on recommendations from the Technical Review Committee, and District 2. The Department’s Contracts Award Committee exercised its statutory authority to reject all bids based on concerns regarding the MOT phasing.
Recommendation Based on the foregoing findings of fact and Conclusions of Law, it is Recommended that the Department of Transportation enter a final order dismissing Petitioner’s Formal Written Protest concerning the bid rejection for the project in this litigation. DONE AND ENTERED this 28th day of December, 2004, in Tallahassee, Leon County, Florida. S STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of December, 2004. COPIES FURNISHED: F. Alan Cummings, Esquire S. Elysha Luken, Esquire Smith, Currie & Hancock, LLP 1004 DeSoto Park Drive Post Office Box 589 Tallahassee, Florida 32302-0589 Mike Piscitelli, Esquire Vezina, Lawrence & Piscitelli, P.A. 305 East Las Olas Boulevard, Suite 1130 Fort Lauderdale, Florida 33301 Calvin C. Johnson, Esquire C. Denise Johnson, Esquire Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Station 58 Tallahassee, Florida 32399-0450 James C. Myers, Agency Clerk Department of Transportation Haydon Burns Building, Mail Station 58 605 Suwannee Street Tallahassee, Florida 32399-0450
The Issue Whether Cubic Western has standing to bring the bid challenge involved in these proceedings.
Findings Of Fact On or about March 31, 1989, CUBIC submitted a Proposal in response to DOT RFP-DOT-88-01 for a toll collection system for Florida's Turnpike. After reviewing this proposal, DOT determined CUBIC's proposal was nonresponsive to the RFP, and on May 18, 1989, advised CUBIC of the rejection of its proposal and of CUBIC's right to challenge this determination by filing a petition for administrative hearing. CUBIC timely filed a Formal Written Protest dated June 5, 1989 requesting an administrative hearing challenging this agency action. This protest was forwarded to the Division of Administrative Hearings by DOT order of July 20, 1989, and the case was scheduled to be heard August 4, 1989. On July 31, 1989, CUBIC filed a Notice of Voluntary Dismissal. The Division of Administrative Hearings entered an ORDER OF DISMISSAL closing the DOAH file and returning the matter to DOT for final disposition. DOT entered a Final Order dismissing CUBIC's bid protest. On October 5, 1989, CUBIC filed an Amended Complaint in the Circuit Court, Second Judicial Circuit, in and for Leon County, against DOT, which had been consolidated with an action filed by PRC against DOT as both cases stemmed from action taken by DOT on RFP-DOT-88-01. In this civil action, CUBIC seeks return of the RFP it submitted to DOT. In this civil complaint CUBIC asserts that since its proposal had been rejected by DOT as nonresponsive to the RFP, at that point in time "DOT and the public had no further interest in CUBIC's Proposal, and there is no public interest to be served by disclosing the CUBIC Proposal at this time." On November 21, 1989, DOT posted notice of its intended award of the contract based on the RFP to PRC. On December 6, 1989, CUBIC timely filed the Formal Written Protest that is the subject of this Motion.
Recommendation It is recommended that the Formal Written Protest dated December 6, 1989, submitted by Cubic Western Data, be dismissed. ENTERED this 2nd day of January 1990, in Tallahassee, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The Desoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of January, 1990. COPIES FURNISHED: Frank A. Shepherd, Esquire Gernard M. Kouri, Esquire Thomas H. Bateman, 111 Kimbrell and Hamann General Counsel Suite 900, Brickell Center Department of Transportation 799 Brickell Plaza 562 Haydon Burns Building Miami, FL 33131-2805 Tallahassee, FL 32399-0450 Robert Daniti, Esquire Ben G. Watts Department of Transportation Secretary Haydon Burns Building, MS 58 Department of Transportation Tallahassee, FL 32399-0458 Haydon Burns Building 605 Suwannee Street Deborah A. Getzoff, Esquire Tallahassee, FL 32399-0450 David Bressler, Esquire Fowler, White, et al. 101 N. Monroe Street Tallahassee, FL 32301
The Issue The issues in this bid protest are whether Intervenor's bid was nonresponsive because Intervenor, a corporation formed in 2005, lacks the required five years' experience in the tree trimming business; and, if so, whether Respondent's preliminary decision to award Intervenor the contract at issue was clearly erroneous, arbitrary or capricious, or contrary to competition.
Findings Of Fact Pursuant to Invitation to Bid No. 27-054X (the "ITB"), which was issued on August 10, 2006, Respondent Broward County School Board ("School Board") solicited bids for "Tree Trimming, Planting, Hurricane Cleanup, and Removal Service." Interested vendors were instructed to bid prices on numerous items of service. The items were sorted into two groups, Group A and Group B. The School Board intended to designate a "primary vendor" for each group, who in the ordinary course of events would receive the largest volume of work, but it reserved the right to procure services from the second and third lowest bidders in each group should it become necessary or desirable to do so. Bids were due on September 13, 2006. Section 4 of the ITB contained "Special Conditions" applicable to this procurement. Of interest in this case is Special Condition No. 11, which specified the qualifications a vendor needed to be considered for an award: BIDDER'S QUALIFICATIONS: Bidder must have at least five years experience in tree trimming services within the Miami-Dade, Broward and Palm Beach tri-county area. Bidder must submit, with the bid or uponrequest, the attached Bidder's Profile form. This report must include a minimum of three references from commercial jobs. Each reference should include the address of the actual job, work accomplished and a phone number and contact person. (Emphasis in original.) The Bidder Profile form to which Special Condition 11 referred was located in Section 7 of the ITB as Attachment 1. At the top of the Bidder Profile appeared the following direction and warning: THIS INFORMATION MUST BE SUBMITTED WITH THE BID. FAILURE TO COMPLETE THIS SECTION WILLDISQUALIFY THE SUBMITTED BID. (Emphasis in original.) Paragraph 12 of the Bidder Profile form stated as follows: References Required. Contractor to provide a list of three references. Three references from jobs completed in each of the past three years. More than one dozen vendors timely submitted bids, which the School Board opened on September 13, 2006. Among the bidders were Petitioner Phil's Expert Tree Service, Inc. ("Expert") and Intervenor Innovative Environmental Services, Inc. ("Innovative"). After tabulating the bids, the School Board determined that Innovative was the lowest and best bid from a responsive, responsible bidder with regard to Group A, followed by Expert and All County Tree & Landscape Co., Inc. ("All County"), in that order. Thus, when the award recommendations were posted on September 27, 2006, Innovative was named the intended primary awardee for Group A, Expert the first alternate, and All County the second alternate.1 Innovative is a family business whose principals are Craig and Deborah Conway, husband and wife. In the year 2000, the Conways moved to South Florida from Pennsylvania, where, for more than 20 years, they had operated a tree trimming and land clearing business. After arriving in Florida, the Conways entered into a business arrangement with Donald Richter, a certified arborist, whereby they jointly provided tree trimming services under the name "ASAP Tree Service" or "Don Richter's ASAP Tree Service." In October 2002, the Conways formed a corporation called Independent Equipment South, Inc. ("Independent"). Independent operated an equipment sales and rental business whose inventory consisted of equipment that was not being used in the family's tree trimming operations. Eventually, the Conways' tree trimming service become part of Independent's business portfolio as well. In February 2005, Innovative was incorporated. At all times relevant to this procurement, Mrs. Conway has been the sole corporate officer, Mr. Conway the company's Director of Operations. In addition, at all relevant times, Innovative has employed or otherwise retained Mr. Richter as its certified arborist. Although Innovative and Independent are separate corporate entities, the two businesses operate out of the same location, have the same employees, and use the same equipment. The Conways commonly refer to their businesses as "IES," using that acronym interchangeably to mean either Innovative or Independent (or both). Innovative's Bidder Profile, which was submitted together with its bid, referred to——and incorporated——an attachment entitled, "Brief Company History." The Brief Company History provided background information on Innovative's provenance, albeit from a layperson's perspective. Written by nonlawyers, the summary was not always technically precise, from a legal standpoint, in its descriptions of the various business associations in which the Conways have been involved. Seizing on the least artful phrases, Expert contends that some of the statements in the Brief Company History were false and perhaps even fraudulent. The undersigned, however, finds otherwise. To the point, the Brief Company History reflects an honest attempt truthfully to describe the Conways' family businesses, which is reasonably accurate when read and understood from the perspective of the small-business owners who prepared it. That said, the undersigned finds and determines that Innovative——as distinct from its principals and/or personnel—— did not have five years' experience in the tree trimming business when it bid on the contract at hand, notwithstanding the wealth of tree trimming experience at its disposal. Indeed, having been in existence for fewer than two years at the time it submitted its bid, Innovative, as a separate legal entity, could not possibly have garnered, in its own right, five years' experience doing anything. For the same reason, though Innovative provided plenty of references, the ones that stemmed from jobs completed before February 2005 necessarily related to providers other than Innovative, such as ASAP Tree Service, who actually existed then. To be sure, the providers who earned the references from earlier jobs upon which Innovative relied either were predecessor business associations or individuals who would become personnel of Innovative——but they were not Innovative. Innovative simply could not have performed or completed any jobs before its creation. It is determined, therefore, as a matter of ultimate fact, that Innovative's bid did not strictly conform to the plain language of Special Condition No. 11. Like Innovative, Expert is a family-owned business. Founded in 1985 by Philip Simeone, Expert was incorporated in 1992. Though Expert clearly possesses the length of experience for which Special Condition No. 11 called, Expert failed in its Bidder Profile to provide three references "from jobs completed in each of the past three years," as instructed in paragraph 12 of the ITB's Section 7, Attachment 1. Instead, Expert gave two references from jobs completed in 2006 plus another from a job completed in 2004. Expert's bid did not contain a reference from a job completed in 2005. Expert contends that the School Board should have rejected Innovative's bid as materially nonresponsive (for lacking the requisite five years' experience) and awarded the contract to Expert as the lowest responsive bidder. The School Board and Innovative take the position that the School Board's decision to treat Innovative's bid as responsive was not clearly erroneous, arbitrary, or capricious. Turning the tables, the School Board and Innovative argue that Expert's own bid deviated from Special Condition No. 11, in that Expert failed to provide a reference from a job completed in 2005.2 Yet both assert that "it was reasonable for [the School Board] to waive the requirement of the Bidder Profile form that one . . . reference[] be [from] a job completed in the year 2005." Somewhat inconsistently, however, Innovative argues further that Expert's "bid proposal cannot be sustained"——evidently due to its material nonresponsiveness. This apparent inconsistency follows from Innovative's attempt to play down its alternative position, which is that if "a contrary conclusion [had] been reached as to [Innovative's] experience"—— meaning that if the School Board had chosen not to waive any irregularity concerning Innovative's length of corporate experience——then the "same analysis would apply to" Expert—— meaning that Expert's bid too should have been disqualified. Thus, even though Innovative maintains that the School Board reasonably waived any irregularities in Expert's bid, Innovative is unwilling to concede that the School Board did not err in determining that Expert's bid was responsive, evidently out of concern that such an admission might compromise its fallback position. Innovative's bottom line is that if Innovative's bid were to be disqualified as materially nonresponsive, then Expert's bid would need to be rejected, too.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board enter a Final Order that (a) declares Innovative's bid to be materially nonresponsive and, accordingly, rescinds the proposed award to Innovative; and (b) declares Expert's bid to be materially nonresponsive and, accordingly, rejects the same. Because the choice of remedies for invalid procurement actions is ultimately within the agency's discretion, the undersigned declines to make a recommendation as to whether the School Board should award the contract to All County (which was the putative "second alternate") or reject all bids and start over. DONE AND ENTERED this 19th day of March, 2007, in Tallahassee, Leon County, Florida. S JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2007.
The Issue Whether, when making a recommendation to award ITB No. 15C-26K (Term Contract for the Purchase of Physical Education/Athletic Supplies, Equipment, and Uniforms) to (1) Matty's Sports (Matty's), (2) Simmons Team Sports (Simmons), (3) D&J Commerce Solutions, Inc., d/b/a OLC Team Solutions (D&J), and (4) Palm Beach Sports (PB Sports), Respondent, School Board of Palm Beach County (School Board), acted contrary to one or more governing statutes, rules, policies, or procurement specifications, or any combination thereof; and if so, for each such instance, whether the misstep was clearly erroneous, arbitrary or capricious, or contrary to competition.
Findings Of Fact ITB No. 15C-26K and the Bid Process On November 4, 2015, the School Board issued Invitation to Bid (ITB) No. 15C-26K entitled "Term Contract for the Purchase of Physical Education/Athletic Supplies, Equipment and Uniforms" for the provision of athletic equipment (hard goods) and athletic clothing, including uniforms (soft goods). The ITB offered prospective vendors the opportunity to bid on 26 items but did not require that a vendor offer a bid for each of the 26 identified items. The odd-numbered items were for hard goods and the even-numbered items were soft goods. Paragraph G,
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Palm Beach County enter a final order that adopts the Findings of Fact and Conclusions of Law contained herein, dismisses the protest filed by BSN Sports, LLC, and upholds the awards of contracts ITB No. 15C-26K to Matty's Sports, Simmons Team Sports, D&J Commerce Solutions, Inc., and Palm Beach Sports. DONE AND ENTERED this 22nd day of July, 2015, in Tallahassee, Leon County, Florida. S MARY LI CREASY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 22nd day of July, 2015.