MIDWEST INDUSTRIAL PAINTING OF FLORIDA, INC. vs. DEPARTMENT OF TRANSPORTATION, 87-003599BID (1987)
Division of Administrative Hearings, Florida Number: 87-003599BID Latest Update: Sep. 15, 1987

Findings Of Fact Introduction On an undisclosed date, respondent, Department of Transportation (DOT), gave notice to qualified and interested contracting firms that it was accepting bids from firms interested in providing various services on State Job No. 90030- 3539. Such bids were due on or before June 24, 1987. In general terms, the project required the successful bidder to perform various maintenance services on the Old Seven Mile Bridge between Pigeon Key and Knight Key just southwest of Marathon in Monroe County, Florida. The parties have stipulated that the project involves the following classes of work: Bridge painting 82 percent Restoration of spalled areas 6 percent Miscellaneous concrete and steel 9 percent Maintenance of traffic 3 percent In response to this offer, three contractors submitted timely bids. These included petitioner, Midwest Industrial Painting of Florida, Inc. (Midwest), intervenor-respondent, Cone Constructors, Inc. (CCI), and J. D. Abrams, Inc. Their respective bids were $1,746,390, $1,122,000 and $2,149,345. The parties have stipulated that the bids of both CCI and Midwest are below the DOT budget estimate and preliminary estimate for the project. On August 3, 1987 DOT posted its intent to award the project to CCI, which submitted the lowest dollar bid. Thereafter, petitioner timely filed a protest challenging the award of the contract to CCI. In its formal protest, Midwest contended that CCI was ineligible to submit a bid since it was not prequalified by DOT to perform bridge painting, a service required for this job. The filing of the protest prompted the instant proceeding. The Project The Old Seven Mile Bridge, once a vital link in the Florida Keys highway network, was replaced in the early 1980s with a new Seven Mile Bridge. Since its replacement, the old bridge has had very little, if any, traffic and is no longer in service as a state highway. Indeed, its center span has been removed, and it is used primarily as two fishing piers by avid anglers and for access to Pigeon Key where a University of Miami research facility is located. The legislature recently mandated that the old bridge be turned over to the Department of Natural Resources (DNR). So that DNR receives the bridge in good condition, DOT intends to perform all necessary maintenance and rehabilitation prior to its turnover. The project has been identified as State Job 90030-3539. The job includes painting the exposed structural steel, doing "corrective measures" to portions of the structural members, and other miscellaneous work. The project will be funded wholly with state funds, and is not considered a critical job. Although at hearing DOT personnel considered the structural work to be the most important aspect of the project, and the painting to be incidental, DOT did not prepare the bid specifications in this manner. Rather, it elected to prepare the specifications listing bridge painting as normal work. By categorizing the work in this manner, DOT did not contravene any statute, rule or standard. Had DOT categorized painting as "specialty" or incidental work on the project, painting would have been considered an incidental aspect of the job, and bidders would not have to be prequalified in bridge painting. However, DOT did not assert its specifications were in "error," or that this might serve as a ground to reject all bids. Indeed, there is no evidence that any bidder was confused or had any doubt as to the services required under the contract. Prequalification Requirements DOT requires that, on projects exceeding a cost of $250,000, bidders obtain a certificate of qualification setting forth the areas (classes) in which they are qualified to perform work. This is commonly known as prequalification. One of these classes of competency is bridge painting, which constituted approximately 82 percent of the work to be done on Old Seven Mile Bridge. The parties have stipulated that CCI's certificate of qualification did not include bridge painting as an area in which it had been qualified. Despite several post-June 24 requests by DOT to furnish additional information, CCI had not yet supplied such data at the time of hearing as would enable it to qualify. On the other hand, Midwest was conditionally qualified in this area, but, because of certain DOT reservations, its certificate was due to expire on June 15, 1987. However, Midwest requested a Section 120.57(1) hearing to contest this expiration date, and Midwest has, with DOT's acquiescence, continued to use its certificate for bidding purposes until an adjudication of the claim is made. Without a certificate of qualification, DOT rules provide that a contractor not be given bid documents that would enable it to submit a bid. Further, DOT witnesses confirmed that no bidder has ever been authorized to become prequalified after it had submitted a bid, nor has a nonqualified bidder been awarded a contract. The agency does have a "policy" of allowing contractors who are qualified in the major work class of minor bridge work (but who are not qualified in bridge painting) to receive bid documents on certain major projects. Even so, this policy, however applied in the past, has never been used on a project such as this, and DOT officials confirmed that this was the first time bid documents had been erroneously sent to a nonqualified bidder. DOT's Reaction to the Bids Through "inadvertence" or "error," DOT furnished bid documents to CCI. Thereafter, CCI, Midwest and a third contractor submitted bid proposals. When the bids were opened, DOT discovered that the lowest dollar bidder (CCI) had not been prequalified on bridge painting. The bids were then routed to the DOT technical review committee, a five person committee that reviews projects where the bids do not conform with award criteria. This committee made no recommendation and was "uncommitted." The matter was then reviewed by the DOT awards committee which unanimously recommended that the contract be awarded to CCI even though it had not prequalified on one segment of the work. In proposing that the contract be awarded to CCI, DOT acknowledges that this is not its normal practice. Indeed, it concedes that this is probably the first occasion that it has proposed to award a contract to a nonqualified bidder. However, it considers the project "unique" in the sense that the bridge will be turned over to DNR immediately after the work is completed. In addition, by using CCI, it can save around $624,000 in state funds which can be used to claim almost another $6 million in matching federal funds for other state work. Finally, DOT is fully satisfied that CCI is capable of performing the work on the project, particularly since it considers the structural repairs the most important aspect of the job. If CCI's bid is rejected, DOT's preference is to reject all bids and relet the project. The agency's nonrule policy is that, for projects valued at more than $250,000, a contract will be awarded if the lowest bid is no more than seven percent above DOT's estimate of the project's value. In this case, both CCI and Midwest submitted bids below DOT's budget and preliminary estimates. The Bidders Midwest, which is located in Tarpon Springs, Florida, has been in the bridge painting business for many years, and has worked on DOT projects since 1974. This is the first occasion the firm has filed a protest. The firm is capable of performing the required work. Although its certificate of qualification was supposed to expire on June 15, or before the June 24 bid opening day, Midwest challenged this action and the certificate continues to be used for bidding purposes. The apparent low bidder (CCI) is located in Tampa, Florida and has been engaged in a number of DOT projects since it was formed approximately five years ago. It is now working on three other DOT bridge projects. The firm was prequalified in the bridge painting class in 1983 and 1984, but for some reason, allowed its qualification to lapse. Its present certificate is valid until April 30, 1988 and qualifies CCI to bid on several types of major bridge projects. CCI stands by its bid proposal, and is fully confident the work can be done for $600,000 less than proposed by Midwest. The firm has access to the necessary equipment and manpower to perform the job.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a Final Order be entered rejecting the bid of Cone Constructors, Inc. on the ground it was unqualified and non-responsive, and instead awarding the contract on State Job 90030-3539 to Midwest Industrial Painting of Florida, Inc., which submitted the lowest responsive bid. DONE AND ORDERED this 15th day of September, 1987, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of September, 1987.

Florida Laws (6) 120.57120.60120.68337.11337.1435.22 Florida Administrative Code (3) 14-22.00214-22.00314-22.008
# 1
DEPARTMENT OF NATURAL RESOURCES vs G AND R BUILDERS OF DISTINCTION, INC.,, 92-002292 (1992)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Apr. 10, 1992 Number: 92-002292 Latest Update: Dec. 07, 1992

The Issue Whether the construction activities undertaken by Respondent at the home of George Scantland which lies seaward of the Sarasota County Coastal Construction Control Line constitute a violation of Section 161.053(12), Florida Statutes, and Rule 16B-33.004(4), Florida Administrative Code, and, if so, should an administrative fine be assessed against the Respondent.

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made. George Scantland owns a single-family home on Casey Key in Sarasota County, Florida, which lies seaward of the Sarasota County Coastal Construction Control Line ("CCCL"). Scantland contracted with the Respondent to perform certain construction activities at his home. At the time Respondent entered into the contract, Garry Battaglia was President of the Respondent corporation. On February 13, 1990, the Respondent requested a consultation from the Department regarding the proposed construction activities at Scantland's home. The Respondent submitted a plan of the proposed construction along with the consultation request. At the time of the consultation request, Scantland's single-family home consisted of an on-grade slab on the ground floor level and an elevated second floor with a wooden cantilevered deck on the north and south sides of the property. The consultation request and plan indicate that the Respondent wished to construct a third-story addition including a cupola above the existing second floor, an elevator within the existing wall on the south side of the home, and an enclosure for stairs outside on the existing south side wall. On June 4, 1990, a Department engineer responded to the consultation request in a letter notifying the Respondent that the proposed third-story addition, the cupola and the elevator qualified for an exemption. However, construction of the stairwell enclosure did not qualify for an exemption pursuant to Section 161.053(12), Florida Statutes, because the enclosure modified the existing structure outside the limits of the existing foundation. And, pursuant to Rule 16B-33.004(4), Florida Administrative Code, a permit was required for the proposed stairwell enclosure because the enclosure constituted an addition to a major structure proposed above a preexisting concrete deck. On October 18, 1990, the Department's area inspector visited Scantland's home, prepared a site inspection report, and took photographs. The site inspection report indicates that Respondent was engaged in construction activities at Scantland's home and requested comment from the Department's staff as to whether the work was exempt or required a permit. The first photograph (Exhibit 2A) taken on October 18, 1990, by the area inspector indicates that the existing concrete deck on the ground floor of the north side of the house had been drilled and rebar had been inserted and that concrete blocks were being placed at the bottom of the drills and rebar locations. Another photo (Exhibit 2C) taken on October 18, 1990, by the area inspector depicts the southern wall of the house with temporary shorings supporting the remains of the second floor wooden deck located on top of the preexisting concrete deck. The photo shows that wooden posts in the concrete deck, which had supported the second floor elevated wooden deck, had been flush cut to the ground. After reviewing the site inspection report and photographs, the area engineer in Tallahassee asked the inspector to revisit the site to gather further information regarding Respondent's construction activities. The area inspector revisited the site on October 24, 1990, and prepared a Warning Notice and Violation Report which he hand-delivered to an employee of the Respondent on the job site. The area inspector also took additional photographs (Exhibits 5A-5C) during this visit. The Warning Notice was issued for the placement of drilled rebar and block columns atop an existing concrete slab and placement of a tie-beam system atop the block columns. The Warning Notice put the Respondent (owner's agent) on notice that a violation has possibly occurred and instructed the Respondent to stop construction pending a determination from the Department's Tallahassee office. The Violation Report, which begins the formal entry into the violation process, was issued to both Scantland and the Respondent for the construction of new perimeter block walls atop an existing ground floor concrete deck seaward of the CCCL without obtaining a permit from the Department. The area inspector's initial determination that Respondent's construction activities constituted a statutory violation was confirmed by the Department's engineering staff in Tallahassee. The photographs (Ex. 5A - 5C) taken by the area inspector on October 24, 1990 demonstrate that even after receipt of the Warning Notice, the Respondent continued construction at Scantland's home. The first photograph (Ex. 5A) taken from the north side of the house, shows that placement of the rebar and columns had been completed and a beam had been constructed across and underneath the existing wooden deck on the second floor. A second photograph (Ex. 5B) taken from the south side of the house, shows the new columns and new tie-beams constructed atop the preexisting concrete deck. On November 16, 1990, the area inspector conducted a follow-up inspection of the site, prepared a site inspection report, and took photographs (Ex. 7A -7B). The site inspection report confirms that Respondent was still engaged in construction activities at the site. The report indicates that the area inspector spoke with Garry Battaglia on the site and that Battaglia planned to continue construction until a stop work order was received. Battaglia advised the area inspector at this time that he was applying for a permit for the work. The first photograph (Ex. 7A) taken by the area inspector on November 16, 1990 is an exterior view of the south side of the house which shows that the wall atop the preexisting concrete deck on the southern addition was completed. The second photograph (Ex. 7B) shows the interior of the southern wall where construction of the second story was taking place over the new column wall and tie-beam system built atop the preexisting concrete deck. The Respondent received a copy of a Notice of Apparent Violation of Section 161.053(2), Florida Statutes, dated November 20, 1990, issued by the Department to Scantland for unauthorized construction/excavation seaward of the Sarasota County CCCL. The Notice advised the parties to stop construction activities pending compliance with the law. On December 10, 1990, the Department received an after-the-fact permit application, plan of construction, and survey of the property from the Respondent as agent for Scantland. The plan of construction accurately depicts the structure which is currently on the property, as modified by the Respondent. The completed construction is totally different from the construction activities described in Respondent's consultation request of February 13, 1990. The consultation request submitted to the Department by Respondent in February, 1990 did not indicate that any construction would occur on the north or west side of the structure above the preexisting concrete deck or that the elevator would be constructed on the southwest corner of the home outside the existing wall or that an enlarged garage/storage area would be constructed. All of the above were ultimately constructed by Respondent. The survey of the property, dated March 23, 1990, shows that there was preexisting concrete deck on the ground floor level and a wooden deck on the second floor and that the concrete deck was a separate entity from the strip footing supporting the preexisting structure and that there was no enclosed space above the preexisting concrete deck. On December 19, 1990 the area inspector returned to the site and took additional photographs (Ex. 10A - 10C) and filed a site inspection report. The Respondent continued to engage in construction on the house even after receipt of the Warning Notice and Notice of Apparent Violation. The construction on the south and west sides of the house were never completed, there was a new corridor wall between the elevator shaft and the interior wall of the house, a new column and some new slabs on the ground outside the preexisting foundation of the house. On January 2, 1991, in response to the after-the-fact permit application, plan and survey filed by the Respondent, the Department staff advised the Respondent by letter that the application was incomplete and told the Respondent to stop any further construction activities on the site that had been identified as requiring a Department permit. On January 10, 1991, the Department received from Respondent another plan of the existing structure entitled "Existing First Floor Drawing" drawn on October 25, 1990. The drawing indicates that there was open lattice on the south side of the house; and, the drawing refers to the concrete on the north and south sides of the home as "concrete walk". On January 17, 1991, the area inspector visited the site again, took additional photographs (Ex. 12A -12C) and filed a site inspection report. Again, it was evident that Respondent continued construction on the house despite receipt of the Department's notice of January 2, 1991 advising Respondent to cease any further construction activities. The Respondent received a Notice of Violation, Cease and Desist Order issued by the Department on January 17, 1991 for unauthorized construction seaward of the CCCL. On July 22, 1991, the Department issued Permit No. ST-807 ATF CF to the Respondent as agent for Scantland, authorizing the after-the-fact activities and the proposed minor structures with the condition that the violation would be addressed by the Department through a separate agency action. The generally-accepted definition of "foundation" states that a foundation is the support part of a structure and is restricted to the structural member that transmits the superstructure load to the earth. The strip footing, or wall footing, directly beneath Scantland's home transmits the load of the superstructure to the ground and thus constitutes the foundation of the preexisting structure. The footings on the north and south sides of the home underneath the concrete deck did not support the preexisting structure but rather only supported the preexisting second story wooden deck. As such, the footings below the concrete deck did not constitute part of the foundation of the preexisting structure. The construction at Scantland's home constitutes construction outside the foundation of the Scantland's home and additions to the Scantland's home above the preexisting concrete deck. Respondent knew, or should have known, that a construction permit was required for the construction activities at the Scantland home based on the Department's response to the consultation request. Respondent's continued construction activities at the Scantland home constitutes a violation of the statutes and rules and was intentional in that the Respondent continued the construction activities at the Scantland home despite the repeated notices and warnings by the Department to cease construction until the matter was resolved. The Respondent was agent for Scantland and responsible for obtaining all necessary permits. The construction activities conducted at the Scantland home by the Respondent does not come within the exemption provided for in Section 161.053(12), Florida Statutes, and Rule 16B-33.004(4), Florida Administrative Code, adopted in accordance with the Department's statutory authority. Therefore, the construction was a violation of the statute and Department rule in that Respondent failed to obtain a permit before beginning construction. And, such violation could subject the Respondent, as the owner's agent responsible for obtaining the permit, to a possible assessment of an administrative fine pursuant to Section 161.054, Florida Statutes.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, it is, accordingly, RECOMMENDED: That the Department enter a final order assessing an administrative fine in the amount of One Thousand Five Hundred and No/100 Dollars ($1,500.00) against Respondent. In making this recommendation, I am mindful of Respondent's repeated failure to comply with the repeated notices and warnings without any attempts to resolve the matter. Another basis for the fine is to ensure immediate and continuous compliance in the future as set forth in Section 161.054(4), Florida Statutes. DONE AND ENTERED this 28th day of October, 1992 in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of October, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-2292 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the Petitioner in this case. Specific Rulings on Proposed Findings of Fact Submitted by the Petitioner The following proposed findings of fact are adopted as modified in substance in the Recommended Order. The number(s) in parenthesis is the Finding of Fact which so adopts the preceding proposed finding(s) of fact: 1-9(1-9 respectively): 10(10-11); 11(12); 12(13); 13(13, 14); 14(15); 15(16); 16(17); 17(18-20); 18(21); 19(22); 20(23-24); 21(25); 22(26); 23(27); 24(28-29); 25 (30); 26-28(31); 29(32); 30(33); 31-33(34); 34(35); 35(36); 37(37); 38(38-39); 39(40); and 40-42(41-44). The Department's proposed finding of fact 36 is covered in the Preliminary Statement. The Respondent did not file any proposed findings of fact. COPIES FURNISHED: Lanette M. Price, Esquire Assistant General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399 Garry Battaglia, Qualified Representative G & R builders of Distinction, Inc. 107 Corporation Way, Suite B Venice, Florida 34292 Virginia B. Wetherell Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Mail Station #10 Tallahassee, Florida 32399-3000 Kenneth Plante General Counsel 3900 Commonwealth Boulevard Mail Station #10 Tallahassee, Florida 32399-3000

Florida Laws (3) 120.57161.053161.054
# 2
COMMERCIAL INDUSTRIAL CORPORATION vs DEPARTMENT OF TRANSPORTATION, 12-002870BID (2012)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 28, 2012 Number: 12-002870BID Latest Update: Dec. 10, 2012

The Issue The issue in this case is whether Respondent's intended decision to award a contract, challenged by Petitioner, is contrary to Respondent's governing statutes, rules, policies, or the proposal specifications.

Findings Of Fact Admitted Facts Per Joint Pre-Hearing Stipulation The Department advertised for proposals and bids for the Project under procurement contract number E5R63. Commercial was a bidder on the Department's contract E5R63 for the Project. Commercial reviewed the Department's advertisement for proposals and bids for the Project. The Project consists of replacing the existing Daytona Avenue Bridge (Bridge No.: 795502). The Project was advertised as a low bid design-build Project. Commercial did not file a challenge to the specifications for the Project. The advertisement for the Project included pre- qualification requirements for design professionals and pre- qualification work class requirements for the contractor. The advertisement for the Project included requirements for design professional services 8.1 and 8.2, Florida Administrative Code Rule Chapter 14-75.5/ The bids and technical proposals for the Project were due at the Department's District 5 offices by no later than 2:30 p.m., on June 18, 2012. Commercial submitted a technical proposal for the Project in response to the advertisement for procurement E5R63. Commercial submitted a bid price for procurement E5R63. The technical proposal submitted by Commercial for procurement E5R63 did not contain a firm or individual pre-qualified by the Department to perform work types 8.1 and 8.2. District 5 representatives contacted Commercial and sought to clarify who had been identified in Commercial's technical proposal to meet the pre-qualification requirements for work types 8.1 and 8.2. Andrus Gaudet was identified in response to the inquiry regarding who would satisfy work type 8.1 and 8.2 pre- qualification requirements. As of June 18, 2012, Andrus Gaudet had not been pre- qualified by the Department in work types 8.1 and 8.2 under rule chapter 14-75. The Department determined that Commercial was non- responsive based on its failure to include a firm or an individual possessing the pre-qualification requirements in work types 8.1 and 8.2 as advertised in the procurement solicitation. The advertisement states on page one that "all qualification requirements must be met prior to the Response Deadline." The Department sent a letter to Commercial that informs all responding firms that in order to be considered for the award, the team must be pre-qualified in the areas in the advertisement. Commercial could not be considered for award of this contract since it did not comply with the pre-qualification requirements. Additional Findings of Fact The Department's advertisement summarized the key terms for the Project, which included the following: NOT TO EXCEED BUDGET AMOUNT OR MAXIMUM BUDGET AMOUNT OR BUDGET AMOUNT*: $798,000 * Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds ESTIMATED CONTRACT TIME: 300 Contract Days SELECTION PROCEDURE: Low Bid Design-Build RESPONSE REQUESTED: Fax Order Form STIPEND AMOUNT: No Stipend PREQUALIFICATION REQUIREMENTS: CONTRACTOR-WORK CLASS REQUIREMENTS Minor Bridges DESIGN-PROFESSIONAL SERVICES WORK TYPE REQUIREMENTS Major: 4.1.2-Minor Bridge Design Minor: 3.1--Minor Highway Design 4.1.1--Miscellaneous Structure 7.1--Signing, Pavement Marking and Channelization 8.1--Control Surveying 8.2--Design, Right of Way, and Construction Surveying 9.1--Soil Exploration 9.2--Geotechnical Classification Lab Testing 9.3--Highway Materials Testing 9.4.1--Standard Foundation Studies TECHNICAL QUESTIONS SHOULD BE ADDRESSED TO: http://www2.dot.state.fl.us/construction/bid questionmain.asp. The selection procedure for a low bid design-build project is that the Department's technical review committee starts with the lowest price bidder and reviews that bidder's technical proposal to determine if it meets the technical requirements or if it is non-responsive. If the lowest bidder's technical proposal is deemed non-responsive, the technical review committee proceeds to review the technical proposal of the next lowest bidder. The technical proposals of other bidders are not reviewed at all for responsiveness unless and until the committee deems the lowest bidder's proposal non-responsive. The technical review committee prepares its recommendations as to the responsiveness of the proposals reviewed and identifies which bidder, if any, should be deemed the lowest responsive bidder. The technical review committee recommendations are then submitted to the selection committee, which makes the final decision that is posted as the Department's intended decision. Commercial submitted the lowest bid for the Project in the amount of $780,000. Therefore, the technical review committee began with a review of Commercial's technical proposal. After that review, the technical review committee made the following recommendation: The Technical submitted by [Commercial] was reviewed and is recommended as non- responsive. [Commercial] did not identify how the advertised prequalification requirement on 8.1--Control Surveying and 8.2--Design, Right of Way, and Construction Surveying would be met within their Technical. The technical review committee proceeded to the next lowest bidder, Gregori, with a bid price of $817,500. Gregori's technical proposal was reviewed and found to meet the technical requirements for the Project. The technical review committee recommended that Gregori be deemed the lowest responsive bidder. The decision to award the contract to Gregori was made by the selection committee, which agreed with the technical review committee's recommendations. Before making that decision, the selection committee considered whether Gregori's bid price was reasonable. The selection committee made the judgment that Gregori's bid price, which exceeded the engineer's estimate used to establish the budget amount by a relatively small percentage, was reasonable. Funds for contracts must be provided for in the Work Program. When an RFP is issued, the Department sets aside funds in the Work Program in the estimated budget amount. Therefore, in order for the selection committee to award a contract for a bid price that exceeds the estimated budget amount, the selection committee must get approval to fund the excess amount in the Work Program. In this case, the selection committee obtained approval to add $20,500--the amount by which Gregori's bid price exceeded the advertised budget amount--to the Work Program. Commercial did not contend or attempt to prove that Gregori's bid price was unreasonable. Instead, Commercial's challenge to the intended contract award was that the Department was required to reject the bid as non-responsive, because the bid price exceeded what Commercial referred to as the "advertised not to exceed budget amount." Thus, Commercial's challenge hinges on its characterization of the advertisement as specifying a "not to exceed budget amount." However, the actual language in the advertisement was: "NOT TO EXCEED BUDGET AMOUNT OR MAXIMUM AMOUNT OR BUDGET AMOUNT*: $798,000." Commercial was unable to point to any statute, rule, or RFP specification that narrowed the quoted language or that required the Department to deem a proposal non-responsive solely because the bid price is higher than the advertised budget amount. Without more, the dollar amount identified in the advertisement cannot be considered a "not to exceed budget amount." Instead, the amount was either a "not to exceed budget amount," or a "maximum amount," or simply a "budget amount." Commercial unsuccessfully attempted to prove that the Department's prior practice was to declare non-responsive any bids over the advertised budget amounts. To support its position, Commercial relied on the Department's prior practice in connection with an earlier solicitation for the same bridge replacement project, designated contract no. E5R48 (project E5R48), which resulted in a Department decision to reject all bids and re-advertise. The evidence established that the advertisement for project E5R48 set forth a "NOT TO EXCEED BUDGET AMOUNT OR MAXIMUM BUDGET AMOUNT OR BUDGET AMOUNT" of $650,000. The advertisement specified the same "PREQUALIFICATION REQUIREMENTS" in the same work type categories as did the advertisement for the Project at issue here. Potential bidders were given the opportunity to review the RFP and submit questions to the Department. The questions and answers were posted. One question/answer provided as follows: [Question:] The advertisement makes mention of a Maximum Budget for the project. The RFP is silent as to a Maximum Allowable Bid for the project. Is the budget estimate provided in the Advertisement a maximum bid price and will our bid be non-responsive if it is over that amount? [Answer:] No. Technical proposals and bids were submitted by two bidders in response to the solicitation for project E5R48. Following the same selection procedure as for the Project at issue in this case, the technical review committee first reviewed the technical proposal of the bidder with the lower bid, which was in the amount of $798,000. The technical review committee recommended as follows regarding the lower bidder: The Technical submitted by United Infrastructure Group was reviewed and is recommended as non-responsive. United Infrastructure Group did not identify how the advertised prequalification requirement on 9.3--Highway Materials Testing would be met within their Technical. The technical review committee for project E5R48 did not also recommend that the United Infrastructure Group's proposal be declared non-responsive for the additional reason that its bid of $798,000 exceeded the advertised budget amount of $650,000. The technical review committee for project E5R48 then considered the other bidder's proposal, with a bid price of $1,100,000. However, it did not proceed to review that bidder's technical proposal for compliance with technical requirements, for the following reason: The Technical submitted by Superior Construction Company has not been reviewed. The bid submitted by Superior Construction Company is 69% over the Department's advertised Budget Amount. The Technical Review Committee recommends rejecting all bids and readvertising this project. The selection committee for project E5R48 agreed with the technical review committee's recommendations and made the decision to reject all bids and re-advertise. The Department's representative at the final hearing, who served on the selection committees for both bid solicitation rounds for the Daytona Avenue bridge replacement project, confirmed that the selection committee's decision to reject all bids for project E5R48 was not based on a determination that the two bids were "non- responsive" because the bid prices were higher than the advertised budget amount. Instead, the lower bidder for project E5R48 was deemed non-responsive for the same reason that Commercial was deemed non-responsive in this case (non- compliance with all pre-qualification requirements as of the response due date); and the only other bidder proposed a price that was found to be unreasonably high. The Department has the discretion to award contracts when the amounts bid are higher than the advertised budget amounts, absent an RFP specification to the contrary. In deciding whether to exercise that discretion, one factor the Department considers is the magnitude by which the bid price exceeds the advertised budget amount. For project E5R48, after the low bidder was found non-responsive, the only other bid was so much higher than the advertised budget that the Department reasonably exercised its discretion to reject all bids and re-advertise. When bids come in much higher than estimated for a project, the Department will go back to review the engineer's estimate from which the budgeted amount was derived to determine if something needs to be changed in a re-advertisement, such as clarification of the project terms, increase in the budget amount, or both. In this case, the Department clarified the Project terms and increased its budget amount in the re-advertisement of the Project (but not nearly to the level of the very high bid that the Department refused to consider). The Department's exercise of discretion in the prior solicitation round to not consider a bid exceeding the budgeted amount by 69 percent does not dictate that the Department reject Gregori's bid as non-responsive. Instead, the Department's prior practice was shown to be entirely consistent with the Department's exercise of discretion in this case to consider Gregori's bid that was only three percent higher than the advertised budget amount. Petitioner failed to prove any Department's prior practice of rejecting bids as non-responsive when they exceed the advertised budget amount. The evidence showed otherwise. The evidence regarding project E5R48 also demonstrated that the Department's prior practice has been to reject proposals as non-responsive for failure to meet the advertised pre-qualification requirements as of the response submission deadline. That prior practice is consistent with the Department's decision to deem Commercial's proposal non- responsive because the proposal failed to satisfy all of the advertised pre-qualification requirements as of the response submission deadline of June 18, 2012.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered by Respondent, Department of Transportation, dismissing the formal protest of Petitioner, Commercial Industrial Corporation. DONE AND ENTERED this 20th day of November, 2012, in Tallahassee, Leon County, Florida. S ELIZABETH W. MCARTHUR Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of November, 2012.

Florida Laws (3) 120.569120.57120.68
# 3
HARBOR ESTATES ASSOCIATES, INC. vs. E. BURKE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-002741 (1989)
Division of Administrative Hearings, Florida Number: 89-002741 Latest Update: Jan. 08, 1993

The Issue This proceeding concerns an Intent to Issue a dredge and fill permit given by the Department of Environmental Regulation ("DER") to Respondent, Edmund Burke ("Burke"), for construction of a retaining wall and wooden pile-supported bridge crossing a portion of the South Fork of the St. Lucie River in Martin County, Florida. The ultimate issues for determination are whether Petitioner has standing to challenge the proposed DER action, and if so, whether the proposed agency action complies with the requirements of Sections 403.91 through 403.938, Florida Statutes, and applicable rules.

Findings Of Fact Respondent, Edmund Burke, on January 15, 1988, filed with the Department of Environmental Regulation ("DER") application number 431441608 for a permit to construct a permanent, pile supported, wooden bridge approximately 80 feet long and 10 feet wide connecting the mainland with an island in the South Fork of the St. Lucie River in Martin County, Florida. The bridge was to span a 50 foot canal or creek ("channel") in the River. One of two retaining walls was to be located on the mainland peninsula. The other retaining wall was to be located on the island (the "initial project"). Between January 15, 1988, and April 28, 1989, the initial project was modified by Respondent, Burke, to satisfy DER concerns over potential impacts, including secondary impacts, relevant to the application. The width of the bridge was reduced from 10 feet to 6 feet. The retaining wall initially planned at the point where the bridge intersects the island was eliminated. The retaining wall on the mainland side of the bridge was relocated above mean high water. Sixty feet of the proposed bridge runs from mean high water to mean high water. An additional 10 feet on each end of the bridge is located above mean high water. The project remained a permanent, pile supported, wooden bridge (the "modified project"). The Intent to Issue, dated April 28, 1989, indicated that the modifications required by DER had been made, that the modifications satisfied DER concerns relevant to the initial project, and that DER intended to issue a permit for construction of the modified project. The elimination of the retaining wall obviated any necessity for backfill on the island. The reduction in the width of the bridge virtually eliminated the secondary impacts on the surrounding habitat, resulted in less shading of the water, and precluded vehicular traffic over the bridge. The final modification that was "necessary in order for [DER] to approve this application" was the reduction in the width of the bridge from 10 feet to 6 feet. Petitioner's Exhibit 17. DER's requirement for this final modification was communicated to Mr. Cangianelli in a telephone conversation on April 6, 1989 (Petitioner's Exhibit 18), and memorialized in a letter to Respondent, Burke, on April 14, 1989 (Petitioner's Exhibit 17). The final modification was made, and the Intent to Issue was written on April 28, 1989. Petitioner's Case. Property commonly known as Harbor Estates is adjacent to the site of the modified project. A constructed harbor and contiguous park are located within the boundaries of Harbor Estates. Both are used by residents of Harbor Estates and both are proximate to the site of the modified project. The harbor entrance and site of the modified project are located on opposite sides of a peninsula approximately 40 feet wide and approximately 125 feet long. Boats operated by residents of Harbor Estates that can navigate under the modified project need only travel the length of the peninsula, a distance of approximately 125 feet through the channel, in order to reach the harbor entrance. Boats operated by residents of Harbor Estates that cannot navigate under the proposed bridge must travel around the island, a distance of approximately 1800 feet in the main body of the St. Lucie River, in order to reach the harbor entrance. However, Petitioner presented no evidence that prior to the construction of the bridge the channel was navigable by boats not capable of passing under the bridge after the bridge was completed. Petitioner, Harbor Estates Associates, Inc., submitted no evidence to show facts necessary to sustain the pleadings in the Petition concerning the inadequacy of modifications required by DER. Of Petitioner's 26 exhibits, Exhibits 1-19, 24 and 25 were relevant to the initial project but were not material to claims in the Petition concerning the inadequacy of the modifications required by DER. Petitioner's Exhibit 20 was cumulative of DER's Exhibit 6B. Petitioner's Exhibits 22 and 26, respectively, concern a 1980 bridge permit and a Proposed Comprehensive Growth Management Plan for Martin County, Florida. Petitioner offered no expert testimony in support of the pleadings in the Petition including assertions that: the modified project will have a direct adverse impact upon water quality and the welfare or property of others; the channel is navigable by deep-draft motor vessels; the modified project will result in shoaling that will have to be corrected at the expense of Harbor Estates; the modified project will result in prohibited destruction of mangroves; or that the modified project will cause any of the other specific adverse effects described in the Petition. The testimony of fact witnesses called by Petitioner was not material to Petitioner's claims that modifications required by DER were inadequate. The testimony of Bob Nicholas was relevant to allegations of prior violations but was not dispositive of any issue concerning the adequacy of modifications required by DER. The testimony of William Burr was admitted as rebuttal testimony relevant to precedents in the general area of the modified project but failed to address the adequacy of modifications required by DER. Petitioner consistently demonstrated a lack of knowledge of the applicable law, the proper scope of the formal hearing, and the distinction between argument and evidence. Petitioner repeatedly attempted to establish violations of laws not relevant to the proceeding including local laws and other environmental laws. Petitioner attempted to establish issues by arguing with witnesses during direct and cross examination, and by repeatedly making unsworn ore tenus representations of fact. There was a complete absence of a justiciable issue of either law or fact in this proceeding because Petitioner failed to show facts necessary to sustain the pleadings. Petitioner presented no evidence refuting Respondent, Burke's, showing that the modifications required by DER were adequate to assure water quality and the public health, safety, or welfare, or the property of others. Evidence presented by Petitioner was not material to the issue of whether the modifications required by DER were adequate for the purposes of the law applicable to this proceeding. Therefore, Petitioner participated in this proceeding for a frivolous purpose, primarily to cause unnecessary delay, or to needlessly increase the cost of licensing or approval of the proposed activity. Respondents' Case. The island to be accessed by the modified project is approximately 2.5 acres in area and contains mostly wetland. The island is approximately 900 feet long. The portion of the island that is beyond DER permit jurisdiction is less than 200 feet long and less than 50 feet wide. The site of the modified project is located in Class III waters. Respondent, Burke, provided adequate assurances that portions of the modified project not extending over open water will be constructed upon property owned by him. The single retaining wall to be constructed at the southeastern terminus of the modified project will be constructed landward of DER jurisdiction. The modified project permits neither the installation of water or electrical conduits to the island nor any excavation, filling, or construction on the island. Respondent, Burke, must provide notification to DER before any such activity is begun. The bridge will accommodate no vehicular traffic larger or heavier than a golf cart. Golf cart access is necessary in order to accommodate a physical disability of Respondent, Burke. The modified project employs adequate methods to control turbidity, limit mangrove alteration on the island, and limit potential collisions with manatees. Vegetation, including mangroves, will not be removed. Incidental, selective trimming of vegetation will be allowed to create access to the island. The single retaining wall to be constructed on the mainland will be located landward of mangroves. Turbidity curtains will be used during construction to minimize short term water quality impacts. The modified project requires turbidity screens to be installed if there is any indication of sedimentation. No mechanical equipment will be located on the island during construction. No boats will be moored at the site of the modified project. The modified project will cause no significant downstream shoaling or silting. The site of the modified project is located approximately 15 feet from an existing fishing platform. No significant shoaling has been associated with that platform. The impacts associated with the modified project are similar to the impacts associated with single family docks in the area. No significant shoaling has been associated with such docks. The modified project is not a navigational hazard. The elevation is sufficient to accommodate small boats, canoes, and row boats. Reflective devices are required to alert night boat traffic of its presence. There is adequate clearance under the bridge to prevent obstruction. DER reviewed all applicable rules and criteria in considering the modified project. The modified project will have no adverse effect upon public health, safety or welfare, or the property of others. The modified project will not adversely impact the conservation of fish, wildlife, or their habitats. The modified project will not adversely affect navigation, the flow of water, or cause harmful erosion or shoaling. The modified project will not adversely impact fishing value or marine productivity in the area. The modified project will have no adverse impact upon recreational values in the vicinity. The modified project was reviewed in a manner that is customary for similar projects reviewed by DER. It is common practice for DER employees, as they did in this case, to rely upon opinions of other DER professionals in formulating an intent to issue. Other projects within DER jurisdiction in the general geographic area of the modified project and within the same region were considered in DER's review process. Other docks and marinas have been constructed and are proposed for construction within the South Fork of the St. Lucie River. Bridges including pedestrian bridges have been and are proposed to be constructed in Martin County. DER did not require a hydrographic study because the modified project was considered a minor project. DER review took into account the intended future use of the island property and DER's past experience with Respondent, Burke. As part of its review, DER reviewed a conceptual bridge to a single family residence on the island which would not require any fill or construction of retaining walls. In addition, DER considered previous violations on the island under Florida Administrative Code Rules 17-4.070, 17-4.160, and 17-4.530 in connection with an earlier permit that expired before the initial project was begun. Respondent, Burke, provided reasonable assurances that he is the owner of the site of the proposed project. Respondent, Burke, signed DER's property ownership affidavit and submitted a survey. DER's Intent to Issue does not authorize any construction in any area within the jurisdiction of DER other than the modified project. The Intent to Issue constitutes compliance with state water quality standards. DER has not received any requests for a jurisdictional determination in the general geographic area of the modified project. No enforcement action has been initiated by DER or at the request of a third party against Respondent, Burke, for alleged violations of DER rules.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order on the merits issuing the requested permit and awarding reasonable attorney's fees and costs in accordance with this Recommended Order. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 4th day of April, 1990. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of April, 1990. APPENDIX Petitioner has submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Although most of Petitioner's proposed findings were cast in the form of "fact", they were in substance argument and rejected accordingly. The Petitioner's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 Included in part in Finding 1 Findings as to ownership are rejected as beyond the jurisdiction of the undersigned. Finding as to the late filed exhibit is rejected as irrelevant. 2-4, 10-12, Rejected as either irrelevant 16, or not supported by the record. 5 and 6, 37, 40 Rejected as unsupported by 42 the record. 7, 8, 15 Rejected as irrelevant 17, 21-29 and immaterial 9, 13, 14, 18-20 Rejected as immaterial 30-33, 35 and 36 37(a), 38, 39, 41, 48 20(A) Rejected as irrelevant and immaterial except the last sentence is included in Finding 13 34 Included in Finding 12 Rejected as not supported by the record, hypothetical and immaterial. Rejected as not established by clear and convincing evidence. Respondent, Burke, has submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Respondent. Burke's, Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 15 and 16 Included in Finding 1 17, 26, 27 Included in Finding 2 18, 48 Included in Findings 15 and 16 19, 30, 31, 42 Included in Finding 13 20, 21, 44 Included in Findings 4 and 14 22, 23, 25, 32 Included in Finding 17 24 Included in Finding 16 25, 36-38 Included in Finding 17 Included in Finding 18 Included in Finding 3 Included in Finding 10 Included in Finding 19 35, 39, 43 Included in Finding 20 40, 41 Included in Finding 11 45-47 and 49 Included in Finding 16 51 and 52 Included in Findings 6-8 54 Included in Finding 5 and 8 50 and 53 Rejected as irrelevant and immaterial Respondent, DER, has submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Petitioner's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 and 2 Included in Findings 1 and 2 3 Included in Finding 10 4 and 5 Included in Finding 16 6, 9 Included in Finding 2 7 and 8 Included in Findings 9 and 11 10 Included in Finding 13 11 Included in Finding 15 Included in Finding 17 and 14 Included in Finding 16 COPIES FURNISHED: Dale H. Twachtmann, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Patricia E. Comer Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Patricia V. Bartell Qualified Representative 615 S.W. St. Lucie Street Stuart, FL 34997 J. A. Jurgens Jones, Foster, Johnson & Stubbs, P.A. 505 South Flagler Drive West Palm Beach, FL 33402

Florida Laws (3) 120.57120.69403.0876
# 5
FLORIDA LAND SALES, CONDOMINIUMS, AND MOBILE HOMES vs. HOVNANIAN FLORIDA, INC., 79-001544 (1979)
Division of Administrative Hearings, Florida Number: 79-001544 Latest Update: Oct. 27, 1980

Findings Of Fact Petitioner, Division of Florida Land Sales and Condominiums of the Department of Business Regulation, is seeking by a Cease and Dosist Order to enforce the provisions of Chapter 718, Florida Statutes, the "Condominium Act," pursuant to the authority granted in Sections 718.501(1) and 498.051, Florida Statutes, alleging that it has evidence that Respondent has violated Section 718.401(8), Florida Statutes, by binding an owner of a condominium parcel in Covered Bridge Condominium Phase 18 to the provisions of a long-term lease that contains an escalation clause. Respondent, Hovnanian Florida, Inc., is a "developer" as defined in Section 718.103(13), Florida Statutes. Kevork S. Hovnanian is the President of the corporation. Covered Bridge Condominium Association, Inc., incorporated on June 8, 1971, is an "association" as defined in Section 718.103(2) subscribed to by Kevork S. Hovnanian, Lawrence Dombrowski and John R. Langly (Respondent's Exhibit A). Covered Bridge Condominium No. 18 was created by a "Declaration of Condominium," as defined in Section 718.103(12) and filed on December 14, 1978. Attached as "Exhibit 3" and expressly made a part of Covered Bridge Condominium No. 18 is a "Lease Agreement" dated July 8, 1971 in which Respondent was the lessor and Covered Bridge Condominium Association, Inc. is a lessee (Petitioner's Exhibit 1). Kevork S. Hovnanian is the assignee of the Lease Agreement by assignment from Respondent on June 24, 1974 (Respondent's Exhibit C). Covered Bridge Condominium Association, Inc. is the association responsible for operation of the condominium, Covered Bridge Condominium No. 18. Paragraph IX of the foregoing Declaration, The Operating Entity, states in C.(9) in part that "Every owner of a Condominium Parcel, whether he has acquired his ownership by gift, conveyance or transfer by operation of law, or otherwise, shall be bound by the Bylaws of the Association (Exhibit 2), the provisions of this Declaration and the Long-Term Lease" (Exhibit 3). (Petitioner's Exhibit 1) IX A. provides in part: "Covered Bridge Condominium Association, Inc. shall administer, supervise and shall act by and on behalf of the owners of the family units in Covered Bridge Condominium No. 18 in accordance with this instrument, the Bylaws of the Association annexed hereto as 'Exhibit No. 2' and in accordance with the Condominium Act of the State of Florida, its supplements and amendments." Paragraph XIX of the Declaration, Long-Term Lease, requires each original purchaser from the Developer to execute a copy of the Long-Term Lease to secure the unit owner's (original purchaser's) obligation to pay his share of the common expenses as to the Long-Term Lease. The Long-Term Lease referred to in Paragraphs VIII, IX, X, XI, XII, XV, XVII, XIX, XX and XII of the Declaration was attached as "Exhibit 3" and is the aforesaid Lease Agreement of July 8, 1971 in which the Respondent is the lessor and the Developer, and Kevork S. Hovnanian is the assignee. Paragraph XXI, Miscellaneous Provisions, Section G, provides: "If any of the provisions of this Declaration, or of the Bylaws, or of the Long-Term Lease attached hereto, or of the Condominium Act, or any section, sentence, clause, phrase, or work, or the application thereof, in any circumstance, is held invalid, the validity of the remainder of this Declaration, the Bylaws, the Long-Term Lease or the Condominium Act, and of the application of any such provision, action, sentence, clause, phrase, or word, in other circumstances, shall not be affected thereby." XXI K. provides: "The captions used in this Declaration of Condominium and Exhibits annexed hereto, are inserted solely as a matter of convenience and shall not be relied upon and/or used in construing the effect or meaning of any of the text of this Declaration or Exhibits hereto annexed." XXI N. provides in part: "By way of clarification as to Article XIX of this Declaration, the Long-Term Lease may be amended by an instrument in writing, executed by the Lessor and the Condominium Association, by and through its Board of Directors except there shall be no Amendment affecting the Long- Term Lease which would change a unit owner's rent under the Long-Term Lease nor the manner of sharing common expenses under the Long-Term Lease, nor impair the rights of unit owners to the use and enjoyment of the recreational facilities, without the unit owners so affected, and all record owners of Institutional Mortgages thereon, joining in the execution of said Amendment." The Bylaws in Article XIV, Rules and Regulations, Section 4, "Recreation Area and Facilities," establish rules for the recreational facilities. Section 5, "Conflict," provides that should conflict arise the Condominium Act shall prevail (Respondent's Exhibit B). Section IX, Improvements, of the Lease Agreement provides in part: "The Lessor covenants and warrants unto the Lessee that it has constructed, or is in the process of constructing upon the aforedescribed premises, at Lessor's cost and expense, certain recreational facilities, consisting of a swimming pool and sundeck areas, shuffleboard courts, Community Center Building which will include and provide for a meeting area, cardroom, space for arts and crafts, sewing, and billiards, together with equipment and personalty contained therein, and such other improvements and personalty as Lessor determines in its sole discretion." Section XXIV, Rent Adjustment, provides in part: "Lessor and Lessee herein covenant and agree that the rental payments Provided for in Article III above, shall be adjusted, higher or lower, based upon the Cost of Living Index, as hereinafter defined and provided in this Paragraph at one (1) year intervals, commencing January 1st, 1972, and continuing yearly thereafter throughout the term of this Lease" (Petitioner's Exhibit 1). On September 26, 1979 Respondent sold by Warranty Deed a condominium in Covered Bridge Condominium No. 18 to Mr. and Mrs. Milton Marcus. The deed recited the fact of the assignment of the recreational facilities and further recited: "The Long-Term Lease as to the recreational facilities ... has been contemporaneously entered into by the Grantee(s) herein." On the same date the parties executed an "Acknowledgement of Lease Agreement" which recited their covenant to be bound by the 1979 Long-Term Lease Agreement (Petitioner's Exhibit 2). On October 15, 1979 Respondent sold another condominium in Covered Bridge Condominium No. 18 to Mr. and Mrs. Saul Schwartz with similar recitations and with a similar lease acknowledgement agreement (Petitioner's Composite Exhibit 3) Rental payments attributed to the escalation clause in the Long-Term Lease were paid by Covered Bridge Condominium Association, Inc. subsequent to June 4, 1975, the effective date of Section 718.401(8), Florida Statutes, which declared that public policy precludes the inclusion or enforcement of escalation clauses (Stipulation) On June 5, 1979 Petitioner Division of Florida Land Sales and Condominiums served a Notice to Show Cause why a cease and desist order should not issue on Respondent Hovnanian Florida, Inc. alleging: Covered Bridge, Phase 18, is a condominium created pursuant to the provisions of Chapter 718, Florida Statutes. The Respondent is offering for sale and has closed on contracts for sale of condominium parcels in the condominium. Article IX of the Declaration of Condominium binds the owner of a condominium parcel to the provisions of a long-term lease, attached to the Declaration of Condominium as Exhibit 3. Section XXIV of said long-term lease contains an escalation clause as defined and prohibited by Section 718.701(8)(a), Florida Statutes (1978 Supp.). On July 17, 1979 Petitioner requested an administrative hearing. A Notice of Hearing was mailed by the Division of Administrative Hearings on August 6, 1979 notifying the parties that a formal hearing would be held October 24, 1979 in West Palm Beach, Florida. The notice recited: ISSUES: Whether a cease and desist order should be entered against the Respondent for an escala- tion clause prohibited by statute. AUTHORITY: Chapters 120 and 718, F.S. Sections 718.401 and 718.501(b), F.S.; Section 478.171(1), F.S. The hearing was rescheduled and then continued numerous times but went to hearing on April 15, 1980. In the initial stage of the formal hearing on that date the parties jointly moved for a Continuance on the basis of an attached Stipulation, infra, which it was stated would change the character of the hearing and limit the necessity for an extended hearing. The Stipulation is set forth in full for clarity: "Stipulation A Declaration of Condominium creating Covered Bridge Condominium No. 18, address 7240 Covered Bridge Boulevard, Lake Worth, Florida, 33463, was filed and recorded on December 14, 1978, in the Circuit Court of Palm Beach County. Section XI, entitled "Assessments" of the Declaration states that "the portion of the common expenses under the Long-Term Lease shall be fixed and determined by the Lessor as provided under said Lease." Common expenses are defined in Section IH of the Declaration as "the expenses for which the unit owners are liable to the Association." Section XIX of the Declaration, entitled "Long-Term Lease" refers to a Lease and Assignment "... attached hereto as Exhibit 3 and made a part hereof, just as though said Lease were fully set forth herein." Payments under the lease are declared to be common expenses in Section XIX. By the above- referenced language, the Long-Term Lease is incorporated in and made a part of the Declaration of Condominium. Section XIX requires that each unit owner execute a copy of the Long-Term Lease attached as Exhibit 3, and that such lease be recorded in the Public Records of Palm Beach County, together with the deed conveying the unit to the owners. Exhibit No. 3 of the Declaration entitled "Lease Agreement" is an agreement between Hovnanian Florida, Inc., lessor, and Covered Bridge Condominium Association, Inc., lessee, the entity responsible for the operation of the condominium. Therein, it is stated that any reference to an obligation of a "lessee" shall be deemed to include Covered Bridge Condominium Association, Inc., and all individual lessees, jointly and severally. The Long-Term Lease, in Section III C states that rent due under it shall be the obliga- tion of the Individual Lessees and the Lessee-Association. Section XXIV of the Long-Term Lease provides that rental payments due under the lease shall be adjusted yearly. Such adjustment is computed by utilizing a nationally recognized comodity or consumer price index. Such lease was assigned to KEVORK S. HOVNANIAN by HOVNANIAN FLORIDA, INC., on June 24, 1974. Subsequent to the recordation of the Declara- tion of Covered Bridge Condominium No. 18, the developer did sell units to purchasers, and close on such sales. Purchasers were required to and did sign acknowledgements of Lease Agreement, in which purchasers have agreed to be bound by all the terms, covenants and conditions, set forth in the Long-Term Lease, and acknowledged that their signatures constituted an acknowledgement of the Long- Term Lease Agreement and their covenant to be bound by it. Such purchasers purchased sub- sequent to June 4, 1975. In 1975, Section 711.231, Florida Statutes, became effective on June 4, 1975. That act declared that the public policy of this state precludes the inclusion or enforcement of escalation clauses in leases for recreational facilities on other commonly used facilities serving residential condominiums. That statute has since been renumbered and is now Section 718.401(8), Florida Statutes. It is the position of the developer that all rents, including portions due under the esca- lation clause, are and remain the obligation of the association--lessees and the association remains bound to assess unit owners amounts necessary to pay such rents. The lessor has demanded such amounts from the lessee(s), and the lessee Association has refused to pay them. Rental payments attributed to the escalation clause were paid by the association to the lessor subsequent to June 4, 1975. It is stipulated that the following documents are placed before the Hearing Officer for con- sideration in deciding this matter, subject to the recitals in #13 relating to the determina- tion of the relevancy and admissability in this cause For petitioner: Warranty Deed - Hovnanian, Inc. to Saul, Shirly & Schwartz Acknowledgement & Acceptance by Grantee, Saul, Shirly & Schwartz Acknowledgement of Lease Agreement Milton & Rose Marcus Warranty Deed Hovnanian, Inc. to Milton & Rose Marcus Amendment to Declaration of Condominium Covered Bridge No. 18 Recorded August 31, 1979 Amendment to Declaration of Condominium Covered Bridge No. 18 Recorded April 26, 1977 Amendment to Declaration of Condominium Covered Bridge No. 18 Recorded February 21, 1979 Declaration of Condominium Covered Bridge No. 18, with Exhibits Recorded December 14, 1978 Complaint for Damages and Declaratory Relief, Case No. 79-306, 15th Judicial Circuit. Answer, Affirmative Defenses and Counterclaim, Case No. 79-306, 15th Judicial Circuit. Offering Circulars Without Exhibits For Respondent: All documents listed by Petitioner: Bylaws of Covered Bridge Condominium Association, Inc., as recorded in Official Record Book 1913 at pages 1025 through 1054 and in official Record Book 1013 at pages 1085 and 1086 of the Public Records of Palm Beach County. Assignment of Lease dated June 24, 1974 as duly recorded in Official Record Book 2320 at pages 1096 through 1100 of the Public Records of Palm Beach County, Florida. Covered Bridge Plat #1, as recorded in Plat Book 29 on Page 44 of the Public Records of Palm Beach County, Florida. Covered Bridge Plat #2 as recorded in Plat Book 29 on page 79 of the Public Records of Palm Beach County, Florida. 1976 Settlement Agreement entered into between Kevork Hovnanian, Hov- nanian Florida, Inc. and Covered Bridge Condominium Association, Inc. Exhibit 4, Offering Circular Petitioner and Respondent agree and stipulate that the facts recited in this stipulation and the documents are true and accurate. The parties reserve the right to present legal arguments directed to the relevancy and/or materiality of any and all facts and documentary evidence, or the contents thereof, to this action. This stipulation is contingent upon the Hearing Officer granting a Motion for Con- tinuance of the hearing scheduled in this matter for April 15 and 16, 1980. The parties agree that this stipulation will not be intro- duced into evidence in any proceeding or used in any manner unless and until the above- referenced Motion for Continuance is granted and, in the event the Motion for Continuance is denied, this stipulation is null and void. In no event will this stipulation be used in any other proceeding. The parties agree that should the stipu- lation be accepted and the hearing continued by the Hearing Officer no witnesses will be called in this cause at any future time, and additional documentary evidence will be placed before the Hearing Officer only upon the agreement of both the Petitioner and Respon- dent to such admission. Petitioner and Respondent agree that the sole remaining matters to be placed before the Hearing Officer shall consist of legal arguments re- lating to the admissability of evidence as stated above, and argument pertinent to the disposition of this cause." The hearing was continued and rescheduled to be heard June 24, 1980. The Notice of Hearing was in the same form and showed the same issue and authorities as stated in each of the previous notices, but with the addition: "issues involved in Stipulation filed April 15, 1980." Thereafter, a Motion to Dismiss for failure to state a course of action was denied. At the commencement of the formal hearing rescheduled for June 24, 1980, Petitioner moved to amend the complaint on the grounds that Article IX (9) of the Declaration was cited in error in the complaint rather than Article XIX (19). The Motion to Amend was orally granted. A Motion for Continuance was then presented by Respondent on the grounds that since the Motion for Amendment had been granted the Respondent had insufficient time to prepare a defense to the amended charge and had not been informed of the issue involved in the case. Believing that the Notice to Show Cause, both original and as amended, together with the Stipulation filed at the previous hearing and the issue and authorities stated in the numerous Notices of Hearing, the Motions and Memoranda filed by Respondent, and the length of time from the inception of the case to the date of hearing had given Respondent adequate notice of the issues involved in the case and the time to prepare, the Hearing Officer denied Respondent's Motion for Continuance of the administrative hearing then in process. Exerpts from the voluminous documentary evidence which was introduced at the hearing are hereinbefore detailed, but a capsule summary of the facts follows: Covered Bridge Condominium Association, Inc. and the plats of the property show that it was anticipated in June of 1971 that Covered Bridge Condominium No. 18 might be erected on said corporate property and that when erected, purchasers of the' condominium units would become members of the Association. The Bylaws in 1971 authorized the Board of Directors of the Association to enter into long-term leases of recreational facilities. The Developer entered into the subject lease agreement that contained an escalation clause with the Association in July of 1971. The lease provided that common expenses would be assessed against all condominium units. Respondent created Covered Bridge Condominium No. 18 by "Declaration of Condominium" on December 13, 1978 "pursuant to Chapter 718, Florida Statutes (1976)." It incorporated the lease agreement of 1971 by reference as well as the Bylaws of 1971 and provided that the operating entity of 1971 should be Covered Bridge Condominium Association, Inc. The Declaration stated under "Operating-Entity" that Covered Bridge Condominium No. 18 should be administered under Covered Bridge Condominium Association, Inc., its Bylaws and "in accordance with the Condominium Act of the State of Florida, its supplements and amendments." Respondent expressly sought to tie the owners to the long-term lease which contained an escalation clause. When the new units in the condominium created in 1978 were sold in 1979, the deeds bound the purchasers to the 1971 lease agreement which provided recreational facilities to the condominium parcel. The parties submitted proposed findings of fact and memoranda of law, and Respondent submitted a proposed recommended order. These instruments were considered in the writing of this order. To the extent the proposed findings of fact have not been adopted in or are inconsistent with factual findings in this order, they have been specifically rejected as being irrelevant or not having been supported by the evidence.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law the Hearing Officer recommends that an order be entered requiring Respondent Hovnanian Florida, Inc. to cease and desist from enforcing the escalation clause in the "Lease Agreement" of 1971 as it pertains to the condominium created in 1978, Covered Bridge Condominium No. 18, and the purchasers of units in said condominium. DONE and ORDERED this 29th day of August, 1980, in Tallahassee, Leon County, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of September, 1980. COPIES FURNISHED: Mary Jo M. Gallay, Esquire Department of Business Regulation 725 South Bronough Street Tallahassee, Florida 32301 Samuel Spector, Esquire Cynthia S. Tunnicliff, Esquire Guyte P. McCord, III, Esquire SPECTOR & TUNNICLIFF, P. A. Suite 750 Barnett Bank Building Post Office Box 82 Tallahassee, Florida 32302

Florida Laws (4) 718.103718.401718.501718.701
# 8
KENNETH J. THOMAS, NANCY ALBRIGHT, ET AL. vs. GENERAL DEVELOPMENT CORPORATION AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-001698 (1980)
Division of Administrative Hearings, Florida Number: 80-001698 Latest Update: Jan. 29, 1981

Findings Of Fact Petitioners own residential property near South Florida Water Management District (SFWMD) Canal C-24. The canal is owned and maintained by SFWMD, an agency of the State of Florida. The State property includes the banks and bottom of Canal C-24 and a 50-foot-wide strip of land which separates Petitioners' property from the canal. However, some of the Petitioners have obtained permits from SFWMD to maintain boat docks in the canal and to cross the 50 feet of intervening property as necessary. Canal C-24 is closed to navigation immediately west of Petitioners' property by a SFWMD dam used to control the water level. However, the canal is open to navigation east of the dam and connects with the St. Lucie River which flows into the Atlantic Ocean. Respondent GDC plans the residential development of property east of that owned by Petitioners. Construction of the proposed bridge will improve access to the GDC property and other portions of southeast Port St. Lucie which are now blocked on the north and east by water and on the west by the Florida Turnpike. On August 28, 1980, Respondent Department of Environmental Regulation (DER) issued its Notice of Intent to grant a permit for construction of the bridge with 17 feet clearance. The bridge was originally planned to provide 12 feet clearance which was approved by SFWMD and the City of Port St. Lucie. Based on Petitioner's objections and the recommendation of the US Coast Guard, the clearance was increased to 17 feet. However, Petitioners maintained their opposition, giving rise to these proceedings. At 17 feet the bridge would be approximately six feet below the Florida Turnpike bridge which is situated between the GDC residential development and Petitioners' property. Thus, Petitioners are currently limited to a 23-foot navigation clearance by the Florida Turnpike bridge which was present when they purchased their property. None of the Petitioners operates any boat at his Port St. Lucie residence which would be affected by construction of the proposed bridge. Rather, Petitioners' objections are based on the obstruction of larger boats they might acquire and on the belief that resale value of their property would be diminished. They also content that use of the canal as a hurricane refuge for large boats will be restricted. Finally, Petitioners argue that bridge pilings will cause erosion and thus create a surface hazard in addition to the height impediment. The Petitioners indicated no plans to acquire any power boats of such size as to be restricted by a 17-foot clearance, nor did their plans include the purchase or use of any sailboats which would not already be blocked by the 23- foot turnpike bridge. No studies, appraisals or together evidence was introduced to establish that property values would be affected by construction of the proposed bridge. Conflicting evidence was presented on the use of the canal by third parties as a hurricane refuge. However, the expert testimony given by Respondents' witnesses established that use of the canal during storms was unsafe and impractical due to the narrowness of the canal, the absence of trees to reduce the force of the wind or secure the boats, and the possibility of strong currents caused by operation of the flood control dam. Further, this testimony established that safer moorings are available on the adjacent portion of the St. Lucie River, which has the added advantage of being directly accessible to the ocean. Such moorings are preferable because of the greater maneuverability in the river and the presence of mangroves which provide anchorage and wind protection. The alleged erosion problem was not supported by any studies or expert testimony, but was based on Petitioners' observations of some soil erosion around turnpike bridge pilings. GDC's construction proposal has been considered by DER, and its engineering plans will be reviewed by the City of Port St. Lucie before it authorizes construction. This process should insure that any potential erosion problems are minimized. Furthermore, there was no evidence to indicate that soil erosion, even if it did occur at the site of the proposed bridge, would create any hazard to navigation. The City Manager of Port St. Lucie supports construction of the bridge at its present level. His concern, and that of the City Commission, is centered on the need to deliver police, fire and ambulance service to the area south of the proposed bridge. Additionally, opening of the bridge will result in the improved flow of vehicular traffic in the community. A local contractor who owns lots on both sides of the canal opposes any further elevation of the bridge as it would reduce the view from houses he intends to construct in this area. The GDC evidence established that raising the height of the bridge would also enlarge the property on either side of the canal required for bridge purposes. Finally, the cost of construction of further increasing bridge height would be substantial, amounting to approximately $40,000 per foot.

Recommendation From the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Environmental Regulation grant the permit to General Development Corporation as reflected in the Notice of Intent issued on August 28, 1980. DONE and ENTERED this 8th day of January, 1981, in Tallahassee, Leon County, Florida. R. T. CARPENTER, Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of January, 1981. COPIES FURNISHED: Mr. Kenneth J. Thomas 2649 SW Harem Circle Port St. Lucie, Florida 33452 Ms. Anita R. Cockerham 2549 SW Harem Circle Port St. Lucie, Florida 33452 Mr. Walter J. Konrad Ms. Victoria Konrad 2657 Harem Circle, SW Port St. Lucie, Florida 33452 Mr. Henry Albright Ms. Nancy Albright 2651 Harem Circle, SW Port St. Lucie, Florida 33452 Mr. William Isaacs 2645 SW Harem Circle Port St. Lucie, Florida 33452 Mr. and Mrs. Frederick C. Walrath 2647 SW Harem Circle Port St. Lucie, Florida 33452 Ms. Mary Bruins Kars 2659 Harem Circle Port St. Lucie, Florida 33452 Mr. Norman Zlinkoff 1814 Erwin Road Port St. Lucie, Florida 33452 Mr. Donald M. Homer General Development Corporation 111 South Bayshore Drive Miami, Florida 33131 Randall E. Denker, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Joseph Z. Fleming, Esquire 620 Ingraham Building 25 SE Second Avenue Miami, Florida 33131

Florida Laws (1) 120.57