EDWARD S. COLEY AND JUANITA G. COLEY vs. DEPARTMENT OF NATURAL RESOURCES, 84-002053RX (1984)
Division of Administrative Hearings, Florida Number: 84-002053RX Latest Update: Sep. 21, 1984

Findings Of Fact In 1981, Petitioners Edward S. Coley and his wife, Juanita P. Coley, purchased lot 8, block A, Camp Creek Lake Subdivision, in Walton County, Florida. The lot is located on the beach at the Gulf of Mexico in a platted subdivision. Petitioners purchased the property for the purpose of building a beach house that would eventually be a retirement home. (Testimony of E. Coley Petitioners' Exhibit 1, Respondent's Exhibit 1) At the time Petitioners purchased the lot, there were a number of existing dwellings to the east of the lot and several to the west. The habitable portions of these dwellings for the most part were located at or near the existing coastal construction setback line that had been established by Respondent in 1975 to provide protection to the dune area of the beach. Although Petitioners planned to locate their two-story dwelling approximately on the then-existing setback line, they had not done so at the time a new coastal construction control line was established in December, 1982, which resulted in moving the setback line further landward for a distance of some sixty two feet. The county coastal construction control lines are established under the authority of Section 161.053, Florida Statutes, and are intended to define the portion of the beach-dune system which is subject to severe fluctuations based on a 100-year storm surge. Construction seaward of the line is prohibited unless a permit is obtained from Respondent. (Testimony of E. Coley, Moore, Clark, Petitioners' Exhibit 1, 5, Respondent's Exhibit 1, 20) On September 19, 1983, Petitioners filed an application with Respondent to construct a 2000 square foot two-story house on their lot. The dwelling was designed to have upper and lower decks facing the Gulf, with a dune walkover structure seaward, and a three-car garage attached to the main house by a breezeway. As planned, the seaward extent of the habitable portion of the house would be located some eight feet landward of the old setback line and approximately 62 feet seaward of the existing construction control line. After processing the application, Respondent's Chief of the Bureau of Coastal Engineering and Regulation advised Petitioners by letter dated January 5, 1984 that a staff recommendation to deny the application would be presented to the head of the Department, consisting of the Governor and Cabinet, on January 17, 1984, and advising Petitioners of their rights to a Chapter 120 hearing. By letter of January 11, 1984, Petitioners did request a hearing pursuant to Section 120.57, F.S., and, on January 17, Mr. Coley appeared before the Governor and Cabinet to support approval of his application. On March 20, 1984, the Governor and Cabinet approved the minutes of its January 17th meeting wherein the apparent basis for the proposed denial of Petitioners' application was stated as follows: The staff is concerned that the applicant is not effectively utilizing the property landward of the control line and that the proposed encroachment is unnecessary and not justified. Prior to the preparation of the structural plans, the staff recommended a 25 foot landward relocation of the structure in order to more effectively utilize the property landward of the control line and provide an effective, protective setback from the active dune area. Presently, there exists approximately 85 feet between the landwardmost portion of the proposed garage structure and the landward property line. The recommended 25 foot landward location represents a compromise that acknowledges the line of existing construction in the immediate area . . . . * * * Dr. Gissendanner stated that this was the first building permitted in this area. All the other buildings there had been built before a permit was required. Now it was necessary to take into consideration the new coastal construction line and the accumulative effect which the new law imposed. The problem was that the Department did not want to start a precedent to allow the house to be built out there and have other people come in and want to build along the same line. By letter of September 29, 1983, Respondent had advised petitioners that any structure of the size proposed by Petitioners located within the dune region would adversely impact and limit the extent of dune recovery following severe erosion associated with a major storm event. The letter proposed a compromise in location of Petitioners' dwelling to a point approximately 25 feet landward of the desired location, thus placing the seawardmost portion of the habitable structure approximately 35 feet seaward of the construction control line. This was stated to be a viable compromise since there existed sufficient room to locate the entire structure, including garage, landward of the control line. Petitioners however declined to accept such a compromise in the belief that to do so would eliminate any view of the Gulf over the dune line except from the upstairs deck of the proposed structure. (Testimony of E. Coley, Moore, Clark, Petitioners' Exhibits 1-2, 9, Respondent's Exhibits 1-8, 13-16) The height of the dune line on petitioners' lot is approximately 27 feet high, which is the same elevation as the first floor of the proposed dwelling at the desired site. The proposed second floor would be 9 feet above the crest of the dune. However, if placement of the structure was moved landward 25 feet, it would be impossible to see over the dune area from the ground floor of the house. Additionally, the view of the beach area would be obstructed by the homes to the east and west of Petitioners' lot. The proposed dwelling is designed for the maximum allowable height of 30 feet. Under deed covenants and restrictions, a variance would have to be obtained to build a taller structure. The value of Petitioners' property would undoubtedly be diminished to some extent if the house was built substantially behind the adjacent dwellings because of the restricted view of the beach and water area. (Testimony of E. Coley, Evans, Petitioners' Exhibits 1, 8) Although there would be no adverse impact on adjacent properties if Petitioners were permitted to build in the desired location, such proposed siting could have an adverse impact on the dune system as a result of a major storm event since the dwelling would be located on the seaward edge of existing vegetation at the landward toe of the dune. If the location were to be moved 25 feet further landward, there would be additional vegetation to facilitate recovery of the system after such a storm. Respondent's Chief of the Bureau of Coastal Engineering and Regulation also believes that the existing structures in that area would be demolished as a result of a major storm, but Petitioners' house, which is designed to withstand a 100-year storm event, would remain, thus impeding full recovery of the dune system. (Testimony of Moore, Flack, Clark, Respondent's Exhibits 9-12, 19, 21) Respondent has permitted several structures in the past which were located seaward of the coastal construction control line, but these were approved because the impact on the dune system was minimized in those locations, and also because the applicants had utilized all of the upland property possible on their lots. (Testimony of E. Coley, Moore, Clark, Petitioners' Exhibits 3-4, 6-7, 9-10) Although conflicting evidence was received as to whether or not the existing structures east of Petitioners lot constitute a "reasonably continuous and uniform construction line," it is found that although minor variations exist in the location of individual dwellings, they do meet the quoted statutory standard set forth in Section 161.053(4)(b), Florida Statutes. The existing structures have not been affected by erosion. (Testimony of E. Coley, Evans, Moore, Flack, Clark, Petitioner's Exhibit 1) Petitioners' structural design meets Respondent's technical requirements subject to standard conditions of the Department. (Testimony of Moore, Evans, Flack, Petitioners' Exhibit 2) The Departmental rules cited by Respondent as the authority for the proposed denial of Petitioners' application are Rules 16B-33.05(1), (2), (6), 33.06(2), and 33.07(2), Florida Administrative Code. (Petitioners' Exhibit 4.)

Florida Laws (3) 120.56120.57161.053
# 3
AUDREY G. DICKASON vs TOM TONA AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-003872 (1991)
Division of Administrative Hearings, Florida Filed:Shalimar, Florida Jun. 25, 1991 Number: 91-003872 Latest Update: Oct. 22, 1991

Findings Of Fact The applicant, Tom Tona, owns the mortgage on the island consisting of Lots 1 and 2, Block 8, Elliots Point Subdivision, Fort Walton Beach, Florida. Mr. Tona has taken steps to perfect his ownership of the island and holds a property interest sufficient to afford him standing to apply for a permit. Elliots Point Subdivision is a residential subdivision development surrounding a lagoon which opens into Santa Rosa Sound in Fort Walton Beach, Florida. The island is located in the lagoon opening to Santa Rosa Sound. It has a large area of wetlands on the north shore. The wetlands function as a habitat for wildlife in the area. Water depths surrounding the island are shallow. The island currently acts as a barrier island for the property located on the shore of the lagoon. The barrier effect of the island helps to prevent the lagoon shore from erosion which would be caused by the wave action in the sound. However, the island, itself, is rapidly eroding due to the same wave action it protects the lagoon shore from. The evidence clearly demonstrated that unless this erosion is stopped the island will completely wash away along with the habitat, including wetlands, it now provides to wildlife and no longer protect the lagoon shore from the erosion it otherwise would experience without the presence of the island. The subdivision appears to be almost completely developed along the lagoon with single family dwellings. A canal consisting of two vertical seawalls runs in between the island and Elliots Point. The canal leads to a public boat ramp within the subdivision. The vertical sea wall of the canal along with the boats that pass through it is causing erosion to occur within the wetlands adjoining the seawall. It is this 55 foot area of the wetlands that Respondent proposes to construct part of the riprap revetment. Petitioner, Audrey Dickason, owns property on the far side of the lagoon from the island. Petitioner's property does not adjoin the island, but is close enough to the island to be within view of the island. On March 6, 1991, the applicant submitted an application to the Department of Environmental Regulation for a dredge and fill permit to construct a riprap revetment around the entire island. This was Mr. Tona's first application with the Department and at the time of filing Mr. Tona was very inexperienced in completing dredge and fill applications. The application was completed to the best of Mr. Tona's knowledge. Additionally, as happens with any form document, this application did not entirely fit the fact that this was an island project and the type of property interest Mr. Tona was asserting over the island. The application as originally filed did not list any adjacent property owners. Mr. Tona did not believe there were any adjacent property owners since an island was involved. Regardless of whether Mr. Tona should have listed any property owners of the subdivision, the failure to list any such property owners was not done to deceive or defraud the Department or the island's neighbors and in reality had no impact on the notification of parties who may have been interested in Mr. Tona's application. The owners of the property directly across from the island testified at the hearing and voiced their concerns to the Department during the processing of the application. Moreover, as indicated earlier, Petitioner's property does not adjoin the island. Since Petitioner's property does not adjoin the island, she was not entitled to be listed in Mr. Tona's application for the dredge and fill permit. The evidence simply did not establish that this debatable issue justifies the denial of Mr. Tona's application for a dredge and fill permit. The application filed by Mr. Tona also had the box indicating that he owned the property checked. The other box which could have been checked was that he would acquire an interest in the property. Neither box quite fit Mr. Tona's circumstances since he already had an interest in the property. The Department advised that it would be sufficient to check the ownership box and attach a copy of the mortgage assignment which gave Mr. Tona his interest. Mr. Tona followed the Department's advice. Again, the information as to ownership was not submitted to deceive or defraud the Department or the island's neighbors and in reality had no impact on the application process. In fact, the necessary information to determine Mr. Tona's interest was submitted to the Department. Again, there is nothing in the information submitted by Mr. Tona in the application which would justify denying that application as it has since been amended. As indicated above, after consulting with the Department, Mr. Tona amended his application so that the riprap revetment would only be constructed on a 55 foot strip along the northwest corner of the island immediately adjacent to the vertical seawall and on a 322 foot stretch of the island shore, beginning at the intersection of the vertical seawall and the southwest shore of the island and extending along the shore of the island to the edge of the wetland marsh on the north side of the island. The riprap would consist of clean limestone and would extend into state waters. The fill would not impede the flow of water or cause harmful erosion or shoaling. In fact, the purpose of the revetment is to stop the rapid erosion of the island which is currently taking place and preserve the wetland habitat which exists on the island. The evidence did not demonstrate that the type fill the applicant intends to use in the construction of the revetment would cause any significant pollution or water quality problems or adversely affect fish or wildlife. The evidence demonstrated that the placement of the fill would create more habitat for fish and wildlife. The revetment is intended to be a permanent structure. After evaluating the application for consistency with the relevant pollution control standards, the Department determined that the proposed revetment met departmental standards for water quality and the public interest and issued an Intent to Issue with a draft permit authorizing the construction of the riprap revetment described above subject to several standard permit conditions. The modifications of the application along with the permit conditions provide reasonable assurances that the project will not violate water quality standards as provided in Section 403.918, Florida Statutes. Additionally, the historical evidence the Department has gained through observing the impact of other riprap revetments in a similar environment on water quality provides strong support for the above conclusion and in itself is a reasonable assurance that water quality standards will not be adversely impacted by the construction of this riprap revetment. For similar reasons, the evidence demonstrated that the proposed revetment would not be contrary to the public interest. In essence, the evidence demonstrated that the revetment would not adversely impact the public health, safety, welfare or property of others, the current condition or relative value of the area surrounding the proposed project, the conservation of fish or wildlife and their habitats, or cause harmful erosion or shoaling, or involve historical or archaeological resources. In fact, the evidence demonstrated that the only effect on the environment the proposed revetment would cause would be a beneficial effect. Petitioner's fear that the grant of this permit will allow Mr. Tona to build a house on the island and thereby destroy her view is not the type of factor which may be considered in determining whether a dredge and fill permit should be granted or denied. See Miller v. Department of Environmental Regulation, 504 So.2d (Fla. 1st DCA 1988). Petitioner's concerns for the revetment's affect on the wildlife of the area were not established by any evidence. The evidence did demonstrate that Petitioner's concerns for the wildlife using the island were simply feinted by her and are belied by the fact that if the island is not preserved from erosion there will be no habitat for any wildlife to use once the island erodes away. Based on all the evidence, Mr. Tona's application for a dredge and fill permit to construct a riprap revetment should be granted.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order issuing a dredge and fill permit to construct a riprap revetment as sought by Tom Tona in his permit application as amended and subject to the permit conditions contained in the Department's Intent to Issue. DONE and ENTERED this 23rd day of September, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of September, 1991. APPENDIX TO RECOMMENDED ORDER CASE NO. 91-3872 The facts contained in paragraph 1 of Petitioner's Proposed Findings of Fact are adopted in substance, in so far as material. The facts contained in paragraphs 3 and 4 of Petitioner's Proposed Findings of Facts are subordinate. The facts contained in paragraphs 6, 7, 8 and 9 of Petitioner's Proposed Findings of Facts were not shown by the evidence. The facts contained in paragraph 5 of Petitioner's Proposed Findings of Fact are immaterial. The facts contained in paragraph 2 of Petitioner's Proposed Findings of Fact are adopted in substance, except for the finding relating to notice which was not shown by the evidence. The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 of Respondent's Proposed Findings of Fact are adopted in substance, in so far as material. COPIES FURNISHED: Michael Mead P.O. Drawer 1329 Fort Walton Beach, Florida 32549 William Stone P.O. Drawer 2230 Fort Walton Beach, Florida 32549 Candi Culbreath Assistant General Counsel Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel 2600 Blairstone Road Tallahassee, Florida 32399-2400 Carol Browner, Secretary Twin Towers Office Building 2600 Blairstone Road Tallahassee, Florida 32399-2400

Florida Laws (1) 120.57
# 4
THEODORE B. MEADOW vs. DEPARTMENT OF NATURAL RESOURCES, 80-000424 (1980)
Division of Administrative Hearings, Florida Number: 80-000424 Latest Update: Nov. 05, 1980

The Issue Whether a permit should be issued to Petitioner Theodore B. Meadow to construct a dwelling on the Gulf Coast of Florida as requested in his application filed with Respondent Department of Natural Resources.

Findings Of Fact Having considered the evidence and argument of counsel, the Hearing Officer finds: In July of 1979 Petitioner filed an application for a permit to build a duplex dwelling seaward of the coastal construction setback line on a parcel of land bounded by the theoretical extension seaward of the north/south boundary line of Ponce de Leon Street in Yon's Addition to Beacon Hill on St. Joe Beach, Florida. The parcel of land is 70 feet in width and approximately 175 feet in depth to the high-water line of the Gulf of Mexico and lies between State Road 30 (US Highway 98) and the Gulf of Mexico at St. Joe Beach in Gulf County, Florida. The application, Department of Natural Resources File #79-P-283, was filed pursuant to Rule 16B-25.05, Procedure to obtain variance; application, Florida Administrative Code, which had been promulgated under the authority of Sections 161.052, 161.053 and 370.021(1), Florida Statutes. Attached to the application was a copy of a deed to subject property to Albert H. Hinman dated December 12, 1977; an undated authorization from the owner of the property to Petitioner Meadow to apply for a variance and if granted to construct a building on the property; a survey of the property; a floor plan of the building with a typical wall section; and a topographical plat of the lot involved. In response to Rule 16B--25.05(1)(d): "Statements describing the proposed work or activity and specific reasons why the applicant feels the variance should be granted." Petitioner stated, in part, "...the reason that the permit should be granted is because applicant does not have sufficient space on property he is purchasing from A. H. Hinman to construct said building outside of the DNR Coastal Construction Control Line." The survey shows that 14 to 15 feet of the property lies landward of the Department of Natural Resources' setback line. At the time of the hearing no purchase had been made, but there is no dispute regarding the authorization of the owner to allow Petitioner to build if a variance is granted. After filing the application Petitioner consulted with the staff of the Department concerning the construction seaward of the setback line. The Chief Engineer of the permitting section of the Bureau of Beaches and Shores, who is responsible for accepting, evaluating and making recommendations for permits for construction, inspected the site of the proposed structure on October 11, 1979. He took a copy of the plans and specifications for the structure, a plot plan, and the engineering statement which accompanied the plans to review on the site. After the inspection he made a determination that the structure was appropriately designed for the hazard environment and located in such a position as to offer the least potential adverse impact to the beach in the area. Recent topographic changes, topographic data including that submitted by Petitioner, and other historical information was used to assess and evaluate the project. Thereafter, the engineer consulted with the Executive Director of the Respondent Department and gave a favorable recommendation in terms of minimal impact. The Executive Director determined that the structure was designed and located to have the minimum adverse impact on the beach, and that the structure was adequately designed to resist natural forces associated with a hundred-year storm surge (Transcript, pages 52-56). At the formal hearing the Executive Director stated that he based his recommendation for approval by the Executive Board on the precedence of previous action of the Executive Board and because he found that the Petitioner had his application in order. Petitioner Meadow has followed the guidelines of the administrative rules and submitted all required information. He has provided his reason for requesting a variance and believes the information furnished compels the Respondent Department to grant the waiver inasmuch as no modification was requested and he cannot build the structure he desires on the 14 to 15 feet of land he is authorized to use which lies landward of the 1975 setback line. The immediate area involved in this proceeding is relatively undeveloped beach property approximately one (1) mile in length at St. Joe Beach, Gulf County, Florida some twenty-nine (29) miles to Panama City and six (6) miles to Port St. Joe. The real property has been divided into fourteen (14) lots more or less similar to the lot on which Petitioner seeks to construct a duplex (Petitioner's Exhibit 2; Transcript, page 137). No structures except one multifamily dwelling have been constructed on any of the fourteen (14) lots. Most the construction along the nearby coastline was completed prior to March 21, 1975, the date the Respondent Department established a coastal setback line under the then applicable statutes and rules. Beacon Hill is a subdivision about a mile and a half from the subject area on the coastal western edge of Gulf County. The structures are close together, the majority of which were constructed prior to 1975 without a permit from the Respondent Department. Historically, the area would have had a similar topography and beach conditions to the subject area, but because of structures built on the beach vicinity the primary dune system has been eradicated, the beach is narrow in that vicinity, and there is virtually no vegetation (Transcript, pages 135-136). It has been found that any construction, particularly of a building, generally has an adverse impact on a beach dune system (Transcript, pages 149, 161). The "setback line" defined in the 1975 statutes and rules was established March 21, 1975 (Transcript, page 169). Thereafter, in 1978 the legislature amended Section 161.053, Florida Statutes, and ordered the Respondent Department to establish a "coastal construction control line" to replace the setback line, but said line has not yet been established, although at the hearing a member of Respondent's engineering staff stated that a study was in progress. Neither Petitioner Meadow nor Mr. Hinman, the owner of subject property, requested the Respondent Department to review the setback line or establish a coastal construction control line prior to filing of the application in 1979 for a variance of the 1975 setback line (transcript, page 93). "Setback line" and "coastal construction control line" are not synonymous. The setback line set a seaward line for construction, and the coastal construction control line defines the impact of a 100-year storm surge or other predictable weather condition (Transcript, page 179). An engineer on the Respondent Department's staff who qualified as an expert was of the opinion that the coastal construction control line, when established, would be landward of the setback line established in 1975 (Transcript, page 198). There have been two (2) hurricanes which have impacted the Gulf Coast since the setback line was established, one in September of 1975 and one in September of 1979. These storms had relatively little visual impact on the subject beach area except for erosion of the fore dune, but the storms substantially impacted the accretion of the coastline (Transcript, pages 189- 195). At the final hearing Ms. Sally Malone, a resident living one block from the proposed structure of Petitioner Meadow, protested the proposed construction on the beach and in general the removal of trees. The evidence shows she has a legitimate concern for the effect through erosion the construction might have on the beach near her home. Petitioner Meadow and the Respondent Department submitted proposed findings of fact and proposed recommended orders. These instruments were considered in the writing of this order. To the extent the proposed findings of fact have not been adopted in or are inconsistent with factual findings in this order, they have been specifically rejected as being irrelevant or not having been supported by the evidence.

Recommendation Upon consideration of the foregoing Findings of Fact and Conclusions of Law, it is recommended by the Hearing Officer that the application of Theodore B. Meadow for a waiver or variance be denied without prejudice to his refiling an application after the coastal construction control line is established as required by Section 161.053, Florida Statutes, supra. DONE and ORDERED this 5th day of November, 1980, in Tallahassee, Leon County, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the clerk of the Division of Administrative Hearings this 5th day of November, 1980. COPIES FURNISHED: Mark J. Proctor, Esquire Office of the General Counsel Department of Natural Resources 3900 Commonwealth Building Tallahassee, Florida 32303 Cecil G. Costin, Jr., Esquire 413 Williams Street Post Office Drawer 98 Port St. Joe, Florida 32456

Florida Laws (3) 120.57161.052161.053
# 5
WALTON COUNTY AND W. L. "BILLY" MCLEAN vs. DEPARTMENT OF NATURAL RESOURCES, 82-000132 (1982)
Division of Administrative Hearings, Florida Number: 82-000132 Latest Update: Jul. 30, 1982

Findings Of Fact Marvel O. Warren and his brother Dan own a parcel of beachfront property in Walton County, south of State Road 30A (SR30A) near Seagrove Beach. Like Mr. Warren, the other intervenors own beachfront in the area, which lies in County Commission District Five. In 1954, before the Warrens built their house landward of the dunes, no road ran toward the beach from SR30A. Construction traffic to the house site beat down a path, however. In Walton County, each county commissioner is responsible, within the district he represents, for road maintenance and, on existing county right-of- way, for construction of new roads. DNR's Exhibit No., 7; Testimony of Owens. Expenditures in excess of $500 for materials beyond what the county has stockpiled require approval by the full commission, however. Testimony of Owens. FIRST ROAD BUILT Albert Gavin of Freeport was county commissioner for District Five when, in 1958 or 1959, he caused a red clay road to be built from SR30A southerly along the eastern edge of the Warren property over sand dunes and onto the beach to within 20 or 30 feet of the water's edge. During Mr. Gavin's tenure, the county owned a borrow pit and kept no records of how much clay was placed where. (No records of the quantity of clay deposited on the beach at any time were offered in evidence at the hearing.) Fishermen used the road to launch boats into the Gulf of Mexico. Except for any portion that may have extended onto sovereignty land, the road lay on county-owned right-of-way. UPLAND SEGMENT PERMANENT The clay road landward of the sand dunes leading along the eastern edge of the Warren property to SR30A (the upland road) has been consistently maintained and in existence since it was originally built. The upland road ends at the bluff line, which is practically congruent with the coastal construction control line at that point on the coast. DNR's Exhibit No. 4; Testimony of Hill. At some time between 1960 and 1969, also landward of the subsequently established coastal construction control line, a clay parking lot was built adjacent to the upland road. BEACH SEGMENTS EVANESCENT Whenever clay has been placed on the beach, seaward of the crest of the landwardmost sand dune, the gulf has washed it away. Many clay roads at the site did not last the summer. Virtually no clay deposit has lasted longer than a full year. One attempt after another to construct a clay road seaward of the sand dunes (the beach segment) has failed. Witnesses testified that the sun bleached the red clay and that wind covered it with white sand but wave action has been the clay's principal nemesis. When Harold C. Lucas was commissioner for District Five from March, 1968, to January, 1969, no clay was deposited on the beach and there was no beach segment. Except for three months in 1975 when Van Ness R. Butler, Jr., of Grayton Beach, served as District Five's county commissioner, Conley Martin of Portland represented the district from 1969 to 1976. As county commissioners, both of these men directed clay to be placed on the beach at various times. COASTAL CONSTRUCTION CONTROL LINE ESTABLISHED A beach segment was in existence at the time the coastal construction control line was established, and recorded, on June 4, 1975, although the beach segment that then existed went straight from the foot of the sand dune toward the edge of the gulf, instead of veering east like the new; longer beach segment built last September. THEN EXISTING ROAD DESTROYED, REPLACED In September of 1975, Hurricane Eloise removed not only the beach segment of the road but much of the beach, including the dunes themselves. As road foreman for District Five at the time, Robert N. Budreau used a road grader and other equipment to fill a large hole between the Warren house and the sand dune and to cover over broken toilets and other debris with a mixture of sand and yellow clay. After the filling, a roadway was constructed with the same sand and clay mix, extending about 25 feet seaward of the dunes along a line perpendicular to the gulf shore. REPLACEMENT ROAD RECLAIMED BY ELEMENTS In 1976, Freddie M. Bishop was elected county commissioner for District Five. After the beach segment built by Mr. Budreau washed out, at least one constituent, Gene Wesley, asked Mr. Bishop to replace it, but Mr. Bishop broke with sisyphean tradition, and declined to place any clay on the beach, or otherwise attempt to reconstruct or replace the beach segment. By the time petitioner McLean succeeded Bishop as commissioner for District Five, the beach segment had been completely obliterated. The end of the upland road continued, however, to be one of some half-dozen points of access for four-wheel drive vehicles to Walton County's gulf beaches. Commissioner Bishop did cause two truckloads of oyster shells to be deposited on the "hump" of the landward sea dune, on or near the bluff line. NEW BEACH SEGMENT In response to constituents' requests, Mr. McLean ordered a new road built. He caused clay and gravel to be placed and compacted seaward of the coastal construction control line by county workmen and machinery, including some "borrowed" for the purpose from colleagues on the Walton County Commission. Built without a DNR permit in September of 1981, this new beach segment extends 180 feet seaward of the coastal construction control line and takes an unprecedented veer to the east. The only preexisting foundation for the new beach segment was the beach itself. Like Commissioner Anderson, Commissioner W. F. Miles "lent" county trucks he had charge of to respondent McLean, but Mr. Miles did not know in advance that Mr. McLean intended to use them to build a road on the beach. Commissioners Matthews, Miles, and Owens were aware of the existence of the coastal construction control line in Walton County and, in a general way, of DNR permitting requirements and procedures, including the fact that the County Commission itself acts on certain coastal construction applications. Commissioners Anderson and McLean did not testify on these matters. DNR has issued no permit for anything like the new beach segment at any time since the coastal construction control line wad established. DNR has no record of any inquiry concerning the new beach segment by or on behalf of petitioners McLean or Walton County, before the new beach segment was built. There was no showing that Mr. McLean sought legal advice before ordering construction of the new beach segment. Paragraphs 1 through 8 of DNR's "Final Order," as amended at the final hearing and set forth above, have been established by stipulation of the parties. The hearing officer has had the benefit of posthearing submissions, including proposed findings of fact, filed by all parties. Proposed findings have been adopted, in substance, where relevant, except when unsupported by appropriate evidence.

Recommendation Upon consideration of the following, it is RECOMMENDED: That DNR order petitioner Walton County to remove the new beach segment seaward of the Walton County Coastal Construction Control Line within 30 days of entry of a final order. That DNR remove the new beach segment seaward of the Walton County Coastal Construction Control Line itself, in the event of petitioner Walton County's noncompliance with the final order; and take steps to recover the cost from petitioner Walton County. That DNR impose no civil or administrative fine against petitioner W. L. "Billy" McLean. DONE AND ENTERED this 30th day of July, 1982, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 1982. COPIES FURNISHED: George Ralph Miller, Esquire Post Office Box 687 DeFuniak Springs, Florida 32433 W. Dennis Brannon, Esquire Post Office Box 1503 Fort Walton Beach, Florida 32549 Deborah A. Getzoff, Esquire Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303 M. Stephen Turner, Esquire Post Office Drawer 591 Tallahassee, Florida 32303 Elton J. Gissendanner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (3) 120.57161.053161.054
# 6
ROBERT W. DODT vs. DNR & NANNETTE K. SCOGGINS, 84-003997 (1984)
Division of Administrative Hearings, Florida Number: 84-003997 Latest Update: Sep. 11, 1985

Findings Of Fact Nannette K. Scoggins is the owner of the real property located at 5622 Gulf Drive, Holmes Beach, Florida in Manatee County. Nannette K. Scoggins' property, the petitioner's property, 5624 Gulf Drive, and the other adjacent property, 5620 Gulf Drive, are zoned as "A-1 Hotel-Motel" under the City of Holmes Beach Zoning Ordinance. On November 13, 1983, Mrs. Scoggins submitted to DNR an application for a permit for construction seaward of the coastal construction control line (control line). The proposed project, known as Jansea Place, would consist of two multifamily dwellings, four units to a building, divided by a swimming pool. A portion of the most seaward building would extend a maximum of 57 feet seaward of the control line. By letter dated July 11, 1984, DNR notified petitioner that the department was considering the permit application. The petitioner responded by letter dated July 18, 1984, objecting to any construction seaward of the control line. On October 1, 1984, petitioner received notification that DNR intended to recommend approval of the permit. The permit was scheduled for a vote by the Governor and Cabinet on October 16, 1984. The staff of DNR recommended approval of the permit. By telegram dated October 15, 1984, the petitioner requested an administrative hearing, and on October 22, 1984, petitioner filed a petition for a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes. The application for permit No. ME-89 is a complete application for permit to construct seaward of the coastal construction control line. On October 5, 1983, the Superintendent of Public Works of the City of Holmes Beach certified that this project does not violate any ordinance of the City of Holmes Beach. The plans for the proposed project are signed and sealed by an architect registered in the State of Florida, and the submitted plans comply with the design standards established in Rule 16B-33.07, Florida Administrative Code to resist adequately the natural forces associated with a 100-year return interval storm event. The plans, specifications, drawings and other information submitted to DNR with the application for permit to construct seaward of the coastal construction control line are complete and accurate, and meet the requirements of DNR for that purpose. Under the provisions of Rule 16B-33, Florida Administrative Code, the application was determined to be complete on August 6, 1984. The proposed construction is located landward of an existing vertical concrete bulkhead. The seawall was built jointly by the Scoggins and Mr. McLean, who owns the property immediately to the south of the Scoggins' property. The seawall was built after the hurricane of 1972 because the existing dune system had been destroyed. Since that time, the mean high water line has continued to encroach landward to the point where it is now east of the wall. However, the seawall is not necessary for the protection of the proposed building. Although the seawall would fail under the direct impact of a major hurricane, the proposed building is adequately designed to withstand the impact erosion, the wave loads, the winds, and the water forces associated with a major hurricane. The necessity and justification for the project's location in relation to the control line is stated in the application, and petitioner has not challenged the necessity or justification. The City of Holmes Beach Zoning Ordinance requires that the buildings be separated by a minimum of 30 feet. Since the proposed buildings are separated by 30 feet, the proposed seaward building is located as far landward as possible without violating the zoning ordinance. Erosion and structural damage occurred as a result of Hurricane Agnes in 1972 and the "No Name" storm in 1982 in the area between 1,000 feet south of the Scoggins' property and 500 feet north of the Scoggins' property. Although the beach was fairly stable from 1974 to 1979, the beach began to erode in 1980. When the seawall was built in 1974, the dune line was even with the seawall. However, as can be seen from a comparison of the photographs taken in June of 1979 with those taken in early 1985, the beach has eroded since June of 1979 and the dune line is now several feet landward of the seawall. The DNR recommendation for approval of the Scoggin's permit application was based upon historical erosion data for the period between 1940 and 1974, which was the most recent data available that could be used to review the project. Mr. Clark stated that the application was recommended for approval based on the design of the proposed building and its alignment with existing structures built seaward of the control line. The proposed project is located landward of a line of existing structures. Although the adjacent properties have been affected by erosion, there was no evidence presented to show that the existing structures located seaward of the control line have been unduly affected by erosion. In 1974, when the seawall was being constructed, the worker building the seawall dug up part of the petitioner's property and destroyed the sea oats he had planted. However, the proposed project has a driveway encircling the building which would provide vehicular access to the seawall if necessary. The proposed project will partially obstruct petitioner's view to the southwest. However, there was no evidence presented that petitioner's property or the other adjacent property, would be adversely affected in any other way by the proposed project. There was no evidence presented that the proposed project would be affected by, or have an effect on, beach or coastal erosion. The proposed project would have no effect on the beach dune system.

Recommendation Upon consideration of the foregoing, it is recommended that DNR issue Permit Number ME-89 to Nannette K. Scoggins. DONE and ENTERED this 28th day of June, 1985, in Tallahassee Leon County Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of June, 1985.

Florida Laws (3) 120.57161.0536.04
# 7
LOST TREE VILLAGE CORPORATION vs BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND, 90-005337RU (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 29, 1990 Number: 90-005337RU Latest Update: Aug. 28, 1992

The Issue At issue is whether a moratorium, adopted by the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees), constitutes an invalid rule. If the moratorium on authorizations for use of sovereignty, submerged land in connection with development of current unbridged, undeveloped coastal islands is determined to constitute a rule, the secondary issue to be resolved is whether the rule is an invalid exercise by the Board of Trustees of delegated legislative authority.

Findings Of Fact The parties stipulated at the final hearing to the facts set forth in paragraphs 1-10, below. Stipulated Facts The parties do not object to the standing of Petitioners and Intervenors for the limited purposes of this proceeding only and any subsequent appeal. On August 22, 1989, the Board of Trustees accepted a staff report on policy and programs affecting Florida's coastal islands. The Board of Trustees also approved a temporary moratorium on authorizations for use of sovereignty, submerged land that would facilitate development of currently unbridged, undeveloped coastal islands until such time as the Division of State Lands of the Department of Natural Resources (Division) could adopt a policy for such requests. On December 19, 1989, the Board of Trustees deferred consideration of an interim policy governing the use of sovereignty, submerged lands adjacent to unbridged coastal islands. On February 6, 1990, the Board of Trustees voted to again defer consideration of an interim policy governing the use of sovereignty, submerged lands adjacent to unbridged coastal islands until after the issue was reviewed at a Cabinet workshop. On May 8, 1990, the Board of Trustees extended the temporary moratorium announced on August 22, 1989, and directed staff to begin rule making on a rule to serve as interim policy until a comprehensive policy and rule governing coastal islands could be adopted. On June 12, 1990, the Board of Trustees approved a draft of proposed rules relating to the leasing of state-owned lands adjacent to undeveloped coastal islands and directed staff to notice the rules for adoption, hold a series of public hearings and return to the Board of Trustees for final action by September. The proposed rules (Rules 18-21.003 and 18-21.004, Florida Administrative Code) were noticed in the Florida Administrative Weekly on August 10, 1990, and public hearings were held in Tallahassee on September 4, 1990, Ft. Pierce on September 5, 1990, and Naples on September 6, 1990. In August, 1990, petitions were filed challenging the temporary moratorium as a nonrule rule, and the proposed rules, arguing that the Board of Trustees' actions constituted an invalid exercise of delegated legislative authority. On October 9, 1990, the Board of Trustees accepted a status report on the proposed amendments to Rules 18-21.003 and 18-21.004, Florida Administrative Code, relating to the management of unbridged coastal islands. On October 23, 1990, the Board of Trustees considered amendments to the proposed rule based on comments made at the public hearing and written comments submitted to the agency. However, prior to accepting the proposed changes the Board of Trustees approved a request by the Governor's Interagency Management Committee (IMC) for additional time to review the proposed rule amendments. The IMC considered the proposed amended rule on November 29, 1990. Public comments were taken at that meeting which resulted in the IMC recommending that further changes be made to the proposed amended rule. On December 18, 1990, the Board of Trustees approved the withdrawal of the original rule concerning development of coastal islands, authorized changes to the proposed rules and directed staff to notice for adoption the proposed rules as amended. In addition, the Board of Trustees voted to continue the temporary moratorium until the adoption of a coastal barrier island rule. Other Facts The initial moratorium applied to those coastal islands subject to direct or indirect wave, tidal and wind energies and which provide primary or secondary protection to the mainland. Further, islands were to be considered undeveloped if unbridged (not connected via bridge to another upland) and either had no docking facilities authorized by the Trustees, or overall development density consisted of less than one permanent structure per five acres of upland. On May 8, 1990, the Trustees extended and modified the prior moratorium. The effective date of the moratorium remained August 22, 1989, and the following exceptions were created: Notwithstanding the moratorium, the Board shall allow the repair or maintenance of existing utility lines that cross sovereignty submerged land, so long as such maintenance and repair do not provide for an upgrade in capacity to serve additional customers, except to maintain public safety or as ordered by the Public Service Commission. The moratorium shall not prohibit the construction of two- slip private residential docks meeting the requirements of Chapter 18-20.004(5)(b), F.A.C. Notice of the moratorium was not provided and an economic impact statement was not prepared as required by Section 120.54, Florida Statutes. Affected persons were not given a point of entry to challenge the moratorium before it became effective. The moratorium affects sovereignty submerged lands statewide and affects all applicants who seek use of such land to facilitate development of undeveloped, unbridged coastal islands. The moratorium is an agency policy statement of general applicability, which is applied and is intended to be applied with the force and effect of a rule of law. The moratorium continues in effect at the present time with general applicability to a statewide class of persons seeking use of state-owned submerged lands adjacent to unbridged, undeveloped coastal islands as defined in paragraphs 11. and 12., above.

Florida Laws (6) 120.52120.54120.56120.68253.02253.03 Florida Administrative Code (3) 18-20.00418-21.00318-21.004
# 8
KENNETH G. STEVENS AND CHIRL M. STEVENS vs DEPARTMENT OF NATURAL RESOURCES, 90-001507 (1990)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Mar. 05, 1990 Number: 90-001507 Latest Update: Sep. 20, 1990

Findings Of Fact On December 12, 1988, Petitioners filed an application with Respondent for a permit to construct improvements to real property seaward of the coastal construction control line (CCCL). Petitioners' property is located at 2400 North Atlantic Boulevard, Fort Lauderdale, Florida. The parcel of land owned by Petitioners measures approximately 50' in width and 140' in depth and is located in a primarily residential area of beachfront property with high property values. On this parcel is a residence that is approximately 1600 square feet in size. The residence is constructed on reinforced concrete pilings. There are many other residential and commercial structures in this area which are also constructed on reinforced concrete pilings. The improvements to this property seaward of the CCCL that Petitioners desire to make and that Respondent finds objectionable is the construction of a poured monolithic reinforced concrete slab patio supported by twenty-one reinforced concrete pilings. The patio would be approximately 27' by 50' in size. On November 17, 1987, Respondent approved an application filed by a previous owner of this property for the construction of a patio to be constructed with concrete pavers. Petitioners arranged to have the previously approved permit transferred to their name. The project contemplated by the subject application employs a different method of construction than the one permitted in 1987 because Petitioners desire to have a patio that is more attractive and is easier to maintain. Petitioners are also concerned that concrete pavers will be hazardous during a storm since they may be subject to being swept along by high winds and water. Petitioners have valid reasons for preferring the method of construction reflected by the subject application based on aesthetic and maintenance considerations. However, Petitioners did not establish that the proposed method of construction was necessary as a safety measure. To the contrary, the greater weight of the evidence was that blocks the size of the pavers to be used for the construction that has been permitted would not be propelled by either hydrodynamic or aerodynamic forces during a major storm as Petitioners contend. Instead, these blocks would likely be undermined during a major storm and, because of their weight, fall as the beach is eroded. Respondent has regulatory authority over the property in question. Respondent's regulatory authority, which includes rule making authority, is conferred by statute. Respondent's responsibilities include the preservation of the beach-dune area within its jurisdiction. There is a relationship between the siting of a structure, in terms of its proximity to the shoreline, and the likelihood that the structure will have an impact on the beach and dune systems. The subject patio is to be located within the beach-dune system. The patio Petitioners propose to construct on concrete pilings would have more of an adverse impact on the beach-dune system than a patio constructed of concrete pavers. During a major storm, greater erosion on the site around the pilings will occur as a result of scour. Following a major storm, the ability of a dune to re-form will be more inhibited if the patio is supported by pilings. Considering the hundreds of thousands of pilings that are already in place along the beach, the effect of the twenty-one pilings proposed by Petitioners, whether considered individually or cumulatively, will be insignificant. A patio is usually considered by Respondent to be a "minor structure". "Minor structures" are non-habitable structures that are generally designed to be expendable during a major storm event. Dune walkovers, viewing platforms, and decks are examples of minor structures. A patio constructed of concrete pavers would be another example. The nature of their construction permits minor structures to be placed more closely to the shoreline than major structures. The patio as proposed Petitioners has been properly categorized by Respondent as being a "major structure" since it is designed to withstand a major storm event. Respondent has not to date permitted any major structure as far east of the CCCL in this area of Broward County as Petitioner's proposed project. All major structures constructed on pilings that are that far east of the CCCL were built before permits were required. Respondent is concerned that the granting of the subject permit will set a precedent that will require the issuance of permits for the construction of other major structures as far seaward of the CCCL as the Petitioners' proposed project, and that such construction would result in a cumulative adverse impact on the beach-dune system.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That Respondent enter a final order which denies the subject permit. DONE AND ENTERED this 20th day of September, 1990, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of September, 1990. APPENDIX TO THE RECOMMENDED ORDER The following rulings are made on the proposed findings of fact submitted on behalf of the Petitioners. The proposed findings of fact in paragraphs 1-6 and 8-10 are adopted in material part by the Recommended Order. The proposed findings of fact in paragraph 7 are rejected as being contrary to the greater weight of the evidence. The proposed findings of fact in paragraph 8 are rejected as being argument. The proposed findings of fact in the first sentence of paragraph 11 are adopted in material part by the Recommended Order. The proposed findings of fact in the second sentence of paragraph 11 are rejected as being contrary to the greater weight of the evidence. The proposed findings of fact in the third sentence of paragraph 11 are rejected as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 12 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraph 13 are rejected as being conclusions of law that are unnecessary to the conclusions reached. The proposed findings of fact in paragraph 14 are rejected as being unsubstantiated by the evidence. While Petitioners' application included as a proposed condition to the issuance of the permit, a covenant running with the land that would require the property owner to reconstruct the beach-dune system in the event of destruction by a major storm, the evidence did not establish, as Petitioners proposed, that the covenant would "... protect the interests of DNR and its long term end of protecting the dunes and beaches". The following rulings are made on the proposed findings of fact submitted on behalf of the Respondent. The proposed findings of fact in paragraphs 1-2, 5-6, 10-16, 24-27, 30-31, and 33 are adopted in material part by paragraph 1 of the Recommended Order. The proposed findings of fact in paragraphs 3 and 4 are rejected as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 21 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraphs 7-9 and 28-29 are rejected as being unnecessary to the conclusions reached or as being subordinate to the findings made. The proposed findings of fact in paragraphs 17-20, 23, and 32 are rejected as being unnecessary to the conclusions reached. These proposed findings are incorporated in part as conclusions of law. The proposed findings of fact in paragraph 22 are adopted in part by the Recommended Order, and are rejected in part as being subordinate to the findings made. COPIES FURNISHED: Kenneth G. Stevens 412 Northeast Fourth Street Fort Lauderdale, Florida 33301 Dana M. Wiehle, Esquire Assistant General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Room 1003 Tallahassee, Florida 32399-3000 Tom Gardner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ken Plante General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (2) 120.57161.053
# 9
RICHARD O'MALLEY vs. MEISTER DEVELOPMENTS AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-004747 (1986)
Division of Administrative Hearings, Florida Number: 86-004747 Latest Update: Jun. 11, 1987

Findings Of Fact The site of the revetment that is the subject of this litigation is located near the northerly coast of Pine Island in Charlotte Harbor. The property fronts on Pine Island Sound which is inside the barrier islands westward of Pine Island. Pine Island Sound is as an Outstanding Florida Water and Charlotte Harbor at this location is classified as Class II waters. Petitioner's property abuts the property owned by Meister Development Group. On Petitioner's property is located a two-story residence and two rental units. On Meister's property a four unit residential development has been erected. Sometime around 1970 a vertical seawall was erected to protect both Petitioner's property and Respondent's property. Since that time the beach has accreted to the point that by 1989 the sand beach extended an average of approximately twenty-five feet seaward of the seawall in front of Petitioner's property. However, this seawall ended near the middle of Respondents property and erosion of the beach became serious at the four unit residential development building located thereon in 1984. In 1984 the beach at this location had eroded to the point that the high water mark had passed the northern most portion of the building foundation and was threatening to undermine the structure. At this time this shoreline was devoid of aquatic vegetation. Meister employed an engineering firm to prepare a solution to the erosion problem. That firm concluded a revetment was needed and the application for the dredge and fill permit that is here contested was filed in July 1984. Since the application involved use of land seaward of the mean high water, permission of the Department of Natural Resources (DNR) was required before the application could receive final approval. To obtain the approval of DNR Meister agreed to provide a conservation easement to DNR and a public easement to allow the public access to cross the property seaward of the residential development. Additionally Meister conferred with Outstanding Florida Water Group to obtain their acquiescence to the project and agreed to provide navigational aids to mark the Jug Creek Channel across form the Meister property. Before a dredge and fill permit can be granted involving an Outstanding Florida Water the applicant must show the project to be in the public interest. In consulting with DER the applicant proposed a sloping revetment which is generally considered to better tolerate wave action than does a vertical wall. To enhance the public interest concept the applicant agreed to place toe stones at the foot of the revetment and plant mangroves. The toe stones would serve to hold sand in which the mangroves could grow and serve as a habitat for aquatic organisms. The applicant also agreed to place an artificial reef of rocks on the sand shoal which sits about one half mile north of applicant's and petitioner's property. Although the mangroves planted did not survive due to heavy wave action and the permit did not require survivability of these mangroves, at the hearing Meister agreed to a provision in the permit's next renewal that will include a requirement that a percentage of these mangroves planted in the toe stones survive. Landward of the residential development is a stormwater retention area that serves to keep contaminants out Pine Islands Sound. The erosion of the beach at the Meister property was threatening to extend further inland and allow contaminants to leach from the water retention area into Pine Island Sound and contaminate that body of water. Approval of the project would serve to remove that threat and be in the public interest. Finally consideration was given to the fact that the foundation of the condominium was being threatened which affected the dwelling of the residents. Protecting these residences is also considered to be in the public interest. The project was completed during a two weeks period in August 1986. The revetment generally takes off in the same line as the Vertical seawall on petitioner's property and is basically convex to fit the existing building and meet the zoning setback requirement of twenty-five feet from the building. To construct the revetment the existing vertical seawall on Meister's Property had to be removed. During construction turbidity screens were installed and construction was restricted to periods of low water to reduce turbidity. Any excess turbidity caused by the construction would settle out within twenty-four hours. Dr. O'Malley left Pine Island in March and returned in October 1986. At the time he left the beach in front of his seawall extended an average of twenty-five feet from the seawall. When he returned in October the revetment had been completed and approximately fifty-percent of Petitioner's beach had eroded. In October 1986 the beach on O'Malley's property extended two to twenty feet from the seawall. O'Malley was aware that prior to his departure the Meister property had suffered severe erosion. Believing that the construction of the revetment was the cause of the erosion of his beach Petitioner instituted this action. This was the only issue seriously contested. Petitioner's expert witness opined that the revetment acted like a groin east of Petitioner's property and caused a littoral drift, which is basically from east to west in this area, to take the sand from Petitioner's property. Further this witness opined that the longer fetch (area of open water to the north-east of Meister property) was the primary cause of the erosion of the Meister property. Historically beaches erode and accrete. Gentle waves have the tendency to cause accretion while storm waves result in seaward migration of beach sand. Photographs (exhibit 3) of Petitioner's property show typically storm wave generated erosion. The expert opinion of Respondents' witnesses that the erosion of Petitioner's property was caused by storm driven waves and was not caused by the revetment is deemed the more credible explanation of the erosion of Petitioner's beach.