Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
CAROLE C. POPE vs CLIFFORD S. RAY, MARIA S. RAY, AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 03-003981 (2003)
Division of Administrative Hearings, Florida Filed:Cocoa, Florida Oct. 23, 2003 Number: 03-003981 Latest Update: May 13, 2004

The Issue Whether the permit application of Clifford S. and Maria Ray (the "Rays") meets the statutory and rule requirements for the Department of Environmental Protection ("DEP" or the "Department") to issue to the Rays a permit to construct a multi- family dwelling and related structures seaward of the coastal construction control line ("CCCL") on their property in Brevard County?

Findings Of Fact Legislative Intent re: Beaches and Coastal Barrier Dunes The Legislature has declared that the beaches and the coastal barrier dunes in this state, subject by their nature to severe fluctuations, represent one of the most valuable resources of Florida. See § 161.053(1)(a), Fla. Stat. The Legislature has further declared that it is in the public interest to preserve and protect the beaches and dunes from imprudent construction because it can "jeopardize the stability of the beach-dune system, accelerate erosion, provide inadequate protection to upland structures, endanger adjacent properties, or interfere with public beach access." Id. The Legislature has therefore directed the Department of Environmental Protection "on a county basis along the sand beaches of the state fronting the Atlantic Ocean [and other salt water bodies]" to "establish coastal construction control lines." Id. The "Coastal Construction Control Line" A line of jurisdiction, rather than a line of prohibition, the Coastal Construction Control Line (the "CCCL or the "Control Line") is defined in Chapter 62B-331 of the Florida Administrative Code. The Control Line is: the line established pursuant to provisions of Section 161.053, F.S., and recorded in the official records of the county, which defines that portion of the beach-dune system subject to severe fluctuations based on a 100-year storm surge, storm waves, or other predictable weather conditions. Fla. Admin. Code. R. 62B-33.002(12). The Department's Office of Beaches and Coastal Systems has regulatory authority to permit or deny construction seaward of the Control Line pursuant to statutory and rule criteria. This proceeding concerns the exercise of that authority in the form of issuance of a permit for activity seaward of the Control Line in Brevard County. Brevard County's Control Line The Control Line in Brevard County was established by the Department of Natural Resources, an agency of the state and a predecessor of DEP, in 1981 (the "1981 CCCL"). A second Control Line in Brevard County was established in 1986, again by the Department of Natural Resources. It is approximately 150 feet landward of the 1981 CCCL. It will be referred to in this order as "the CCCL" or "the Control Line." The line established in 1981 will be referred to as the "1981 CCCL," to distinguish it from the Control Line established in 1986, the Coastal Construction Control Line applicable to this proceeding. The Parties Mrs. Pope Petitioner, Carole C. Pope, owns with her husband James M. Pope, oceanfront property located at Wilson Avenue, Brevard County, Florida, where the Popes reside part time. The Popes' property has a Cocoa Beach mailing address, but is not within the city limits of Cocoa Beach. Littoral to the Atlantic Ocean, the Popes' property was identified in the pre-hearing stipulation in the Rule-related Cases (discussed in this Order's Preliminary Statement) as "Lot 11, Block 101, Avon by the Sea as described in Plat Book 3, page 7 [presumably the Official Records of Brevard County] and east to Ocean, except the west 13 feet of Lot 11." See Final Order, Pope v. Department of Environmental Protection et al., Case No. 03-3860RX, paragraph 7, page 9. The Popes have two duplex units on their property. Built in the 1950's, they consist of concrete foundations, block walls, and 10-foot-high flat roofs. Mrs. Pope and her husband have retained the native, salt-tolerant vegetation that surrounds the duplexes. Protective of the property because it serves to enhance and stabilize the primary/frontal dune, it also adds to Mrs. Pope's enjoyment and use of her property. She enjoys the native flora, an integral part of the habitat of native fauna (gopher tortoises and indigo snakes, for example) that she enjoys watching. She particularly enjoys feeding and interacting with the sociable scrub jay. The Department and its Office of Beaches and Coastal Systems The Department is responsible for the administration of Parts I and II of Chapter 161, Florida Statutes, the "Beach and Shore Preservation Act." § 161.011, Fla. Stat. The Act confers on the Department the authority "to adopt rules related to the following provisions of this section [§ 161.053]: establishment of coastal construction control lines; activities seaward of the coastal construction control line; exemptions; property owner agreements; delegation of the program; permitting programs; and violations and penalties." § 161.053 (21), Fla. Stat. Pursuant to its rule-making authority in Section 161.053 (together with other specific authority), Florida Statutes, the Department promulgated Rule Chapter 62B-33: "Office of Beaches and Coastal Systems - Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line and Fifty-Foot Setback)." The Office is in the Department. Fla. Admin. Code R. 62B-33.002(11). Permits for construction or other activities seaward of the construction control line, such as the permit in this case, are issued pursuant to Section 161.053, Florida Statutes, by the Program Administrator of the Bureau of Beaches and Wetland Resources on behalf of the Department. See Respondents 1, Vol. 2, Tab 22. The Department has not delegated Chapter 161 permitting authority to Brevard County. The Rays Clifford and Maria Ray are the owners of the property adjacent to Petitioner's property and the holders of Permit No. BE-1083, preliminarily issued by the Department in its final order of September 19, 2003. The property consists of four 50-foot-wide lots, Lots 12, 13, 14 and 15 in Avon by the Sea. Lot 12 is immediately adjacent to Mrs. Pope's property. Some of the native vegetation on the property has been disturbed by the planting of sod and installation of an irrigation system seaward of the Brevard County coastal setback line and the Control Line. The activity is the subject of administrative enforcement actions by the County and DEP. Although government claims of violations had not been resolved finally as of the date of hearing, the Rays have not resisted the claims. The Permit was issued to the Rays under the authority of Section 161.053, Florida Statutes. It authorizes activities on the Ray property seaward of the CCCL. This activity includes the construction of an eight-story, multi-family dwelling, a swimming pool and deck, a wooden beach/dune walkway, a parking area, masonry wall and an exfiltration trench, as described in more detail in the section of the Permit entitled "PROJECT DESCRIPTION." Respondents Ex. 1, Vol. 2, Tab 22, Permit No. BE- 1083, p. 2-3. The Department was not aware of the claims of violations made against the Rays referred-to above at the time that Mr. Tammisetti, the engineer assigned to review the permit file initially, recommended that the permit be issued. Had Mr. Tammisetti been aware of the claims he still would have recommended issuance of the permit. Coastal Systems and Fixed Coastal Cells The term "Coastal System" is defined by the Department in its rules: "Coastal System" is the beach and adjacent upland dune system and vegetation seaward of the coastal construction control line; swash zone; surf zone; breaker zone; offshore and longshore shoals; reefs and bars; tidal, wind, and wave driven currents; longshore and onshore/offshore drift of sediment materials; inlets and their ebb and flood tide shoals and zones of primary tidal influence; and all other associated natural and manmade topographic features and structures. Fla. Admin. Code R. 62B-33.002(13). Within the coastal system are "fixed coastal cells," also defined by Department rule: "Fixed Coastal Cell" is a geomorphological component of the coastal system which is closely linked internally by active physical processes and is bounded by physical features which exercise a major control on refraction patterns or which compartmentalize or severely limit longshore sediment such as headlands or inlets. Fla. Admin. Code R. 62B-33.002(24). Within and adjacent to a fixed coastal cell of Florida's coastal system lie sea, shore, beach, dune system, vegetation, uplands and structures with which this proceeding is concerned. The Beach and Dune System within the Fixed Coastal Cell The Ray property and the Pope property are located in a fixed coastal cell that extends from Canaveral Inlet (north of R014, one of a series of coastal monuments installed by the state) southward to Monument R050. The community in which the property is situated is a "Coastal Uplands: Beach Dune" community characterized by a beach and dune system. There is one primary/frontal dune with a height at the top of the bank of about 13.4 feet NGVD seaward of the proposed project. The portion of property on which the project is sited is between 7.3 and 10.7 feet NGVD. The most recent DEP design wave height elevation for R015 is 14.2 feet NGVD, higher than the existing dune elevation at the Ray property. Much of the Ray property behind the dune is lower in elevation than the elevation of contiguous properties, the likely result of persistent cutting of native vegetation that acts to intercept wind-blown sand as it moves along the shoreline. Beach and Dune Data in DEP File BE-1083 In the application review process, Mr. Tammisetti submitted a memorandum dated May 24, 2001, to Mr. McNeal. The memorandum appears to have been a form with blanks into which information was inserted or handwritten close to the appropriate blank. For example, under Section I., of the form "PROPOSED PROJECT" is "A. Project Location:", followed by a description with blanks left for number of feet, direction (north, south, east, west) reference monument number, county and project address. Handwriting close to the blanks leads one to understand or gather that it intends to communicate the following statements: The location of this project is approximately 100 feet N to 103 feet S of the Department of Environmental Protection's Reference Monument R-15, in Brevard County. Project Address: Harding Ave, Cape Canaveral. This is within the local jurisdiction of Brevard County. Respondents 1, Vol. 2, Tab 13. The form also contains Section II., "CHARACTERIZATION OF BEACH/DUNE SYSTEM". The section calls for three categories of characterization: A., a general description; B., beach topography in terms of shoreline alignment, berm width in feet, berm elevation in feet (NGVD), direction of net littoral transport, volume of net littoral transport in cubic yards per year, and general conditions; and C., Primary Dune/Bluff Topography with dune width in feet. None of the information called for by this section has been filled in on the form. At hearing, Mr. Tammisetti testified2 that berm width was 220 feet and the berm elevation ranged from 3 to 10 feet NGVD. He testified that the direction of littoral transport was north to south but he did not know the volume of net littoral transport. He stated that the "general site condition" was an eroding shoreline. He estimated the dune width at between 30 to 40 feet. These facts and figures exist under an overarching consideration. The beach near R015 that fronts the Pope and Ray property is critically eroding.3 Vegetation on the Ray Property There is a sea grape cluster and numerous palm trees on the Ray property. The seaward most continuous line of native salt-resistant vegetation or the "vegetation line" is near the line at the toe of the slope of the dune bank depicted on the topographic survey drawing submitted as part of the application. Nanette Church, at the time an employee of Brevard County, visited the site on July 1, 2003. She documented the presence of fresh sod and a new irrigation system installed seaward of the County's coastal setback line, a line parallel to and 25-feet landward of the 1981 CCCL. Two days later, DEP Inspector Gene Verano conducted a site inspection and documented the placement of sod and the installation of an extensive irrigation system. On July 31, 2003, the Department under the signature of Jim Martinello, an Environmental Manager in the Bureau of Beaches and Wetland Resources, issued a warning letter to Mr. Ray with regard to "POSSIBLE UNAUTHORIZED ACTIVITIES SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE." The letter reads, in part, Pope 3. [I]t appears that you have again been engaged in unauthorized activities on your property located approximately 100 feet north to 100 feet south of the Department of Environmental Protection's reference monument R-15, in Cocoa Beach, in Brevard County, Florida. The possible violation consists of the destruction/removal of native vegetation and placement of sod and an irrigation system seaward of the coastal construction control line without benefit of a permit from the [department.] The sod seaward of the CCCL has a negative effect on the stability of the dune system. A weakened dune system allows for storm surge and overwash to breach the dune and cause washout on the landward side of the dunes. Brevard County has not yet issued a land clearing or landscape permit to the Rays. A "Brevard County Land Development Site-Plan Approval" with an approval date of December 30, 2003, warned, "[i]t is the responsibility of the Owner/Engineer of Record to contact Office Natural Resources for a Land Clearing/Landscaping Permit." Respondents' 1, Vol. 1, Tab 12. The Rays are not contesting County or DEP enforcement actions relative to the land clearing, sod placement, and irrigation system installation. Project Description The project proposed by the Rays is to be located on their property in the unincorporated area of Brevard County known as "Avon-by-the-Sea," in the vicinity of Department monument R-015. The project is known by Brevard County as the Ray Condos and also as the Michelina Condominium. The location of the multi-family dwelling relative to the Control Line is "[a] maximum of 105.56 feet seaward." Id. Its exterior dimensions are "209.67 feet in the shore normal direction by 84 feet in the shore-parallel direction." Id. The type of foundation is "Pile." Id. There is no mention in the Permit of the height of the building. The swimming pool is described in the Permit in detail with regard to its dimensions and location (a maximum of 101.49 feet seaward of the control line), the type of construction and its maximum depth: six feet. Excavation/Fill for the project is described in terms of volume of excavation, its location, volume of fill as replacement, and location of fill. The Excavation/Fill description is subject to Special Permit Condition 6. Among other provisions of the condition, the fill is to be "from a source landward of the control line and shall consist of sand which is similar to that already on the site in both grain size and coloration." Id., p. 4. Other permitted structures and activities are listed and described in the Permit with reference to special permit conditions: A wooden beach/dune walkway structure of dimensions 174 feet shore-normal by 4 feet shore-parallel is to be located seaward of the control line. See Special Condition 7. A 4-foot to 14-foot swimming pool deck attached to the periphery of the swimming pool is to be located a maximum of 105.96 [feet] seaward of the control line. See Special Permit Condition 2.1. Paver-block parking area on the south side of the proposed dwelling. Masonry walls along the north and south property lines to extend a maximum of 105 feet seaward of the control line. See Special Permit Condition 2.2. An exfiltration system trench on the south side of the proposed dwelling. Among nine special conditions in the Permit are that no work can be conducted until a DEP "notice to proceed" has been received by the Rays. Another is that prior to the issuance of such a notice "two copies of detailed final site and grading plans and specifications" shall be submitted including two sets of landscape drawings. Id., p. 3, Special Permit Condition 2. See id., 2.3. The landscape plan must be submitted to Brevard County for approval under the Permit's special conditions. Given Brevard County's requirement that the Rays secure a Land Clearing/Landscaping Permit, there will be an ongoing process that poses the potential to ensure that the Rays' project will be designed to minimize the impact on native vegetation. The process also may require a restoration plan, as well, for the impact to native vegetation caused by the sod and the irrigation system. The Rays have submitted such a plan to the County. Relationship of the Proposed Project to the Pope Property The proposed multi-family dwelling is sited 10 feet south of the northern property line (the line that serves as the southern boundary of the Pope property). Ten feet is the minimum setback from adjacent property allowed by the county. The duplexes on the Pope property are situated in a range from 3.5 to 4.5 feet from the property line (the border with the Ray property.) The project, therefore, is proposed to be as close as 13.5 feet of the Pope duplexes. If built, running the length of the duplexes, it would create a relatively narrow space between the proposed structure and the Popes' duplexes that ranges from 13.5 feet to 14.5 in width. The Application The Rays submitted their CCCL permit application to the Department through their agent, Joyce Gumpher. On January 24, 2003, Ms. Gumpher executed a certification "that all information submitted with this application is true and complete to the best of [her] knowledge." Respondents Ex. 6, APPLICATION FOR A PERMIT FOR CONSTRUCTION SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE OR FIFTY-FOOT SETBACK. The application was received by DEP on January 27, 2003. Additional information was requested by the Department. On April 21, 2003, the Department deemed the application complete. During the application process, several plan sheets were revised. Revised plan sheets were submitted after the application was deemed complete (see Respondents' Ex. 6, July 29, 2003 plans and September 5, 2003 plans) and once prior to DEP's determination of its completeness. (see id., April 7, 2003 plans). Review of the Application On August 26, 2003, Mr. Tammisetti submitted a memorandum to Mr. McNeal that recommended approval of the application with special permit conditions. The memorandum, similar in form to the memorandum submitted on May 24, 2001, except for the lack of Part II., is entitled "Description of Beach and Dune System Fronting the Subject Property and an Analysis of Impacts to be Expected From the Proposed Construction." Respondents 1, Vol. 2, Tab 20. It describes the proposed project but, lacking Part II., it neither characterizes nor describes the beach/dune system. Nor does it analyze the impacts of the proposed project other than to provide the "final comment" that "[t]he proposed project is landward of line of construction and 30-year erosion project. Impactive shore- parallel coverage is approximately 72%." Id., p. 3. Under its rules, after reviewing all information required, the Department is mandated to: Deny any application for an activity which either individually or cumulatively would result in a significant adverse impact including potential cumulative effects. In assessing the cumulative effects of a proposed activity, the Department shall consider the short-term and long-term impacts and the direct and indirect impacts the activity would cause in combination with existing structures in the area and any other similar activities already permitted or for which a permit application is pending within the same fixed coastal cell. The impact assessment shall include the anticipated effect of the construction on the coastal system and marine turtles. * * * Require siting and design criteria that minimize adverse impacts and mitigation of adverse or other impacts. Fla. Admin. Code R. 62B-33.005(3). As found earlier, the file in BE-1083 does not contain any documentation that the Department conducted the impact assessments required by the rule. Nonetheless, the Department based its evaluation on the portion of the fixed coastal cell from just north of R013 to approximately 400 feet south of R017 depicted on Respondents' 7. Respondents' 7 Respondents' 7 is an aerial photograph of developed uplands and off shore waters of the Atlantic Ocean in between which is the shore line and a stretch of beach in Brevard County. The sandy beach in the photo runs from north to south from Monument R013 to approximately 400 feet south of Monument R017, five monuments in a series set by the state along the Brevard County coast. The photograph is data the Department reviewed to determine if existing structures established a "reasonably continuous and uniform construction line closer to the mean high water line than [the coastal construction control Line]." § 161.053(5)(b), Fla. Stat. (This "reasonably continuous and uniform construction line" will be referred to as the "Construction Line" in this order.) The Pope property and the Ray property both straddle the Construction Line. The photograph shows four structures (the "Four Structures") that were determined by DEP to establish the Construction Line. Two are to the north of the Ray property; two are to the south. Of the two structures to the north, the closest is between 400 and 450 feet north of the northern boundary of the Ray property. It sits between Monument R015 and R014. The other structure to the north used to establish the Construction Line lies between Monument R014 and R013. Its southernmost corner is approximately 1200 feet to the north of the northern boundary of the Ray property. The roof of the closest of the Four Structures to the south, lying between Monument R015 and R016, viewed from the air above is rectangular indicating the structure to have a rectangular footprint. Positioned at an angle to the coast, its southeastern corner is along the 1981 CCCL. That corner is approximately 400 feet south of the southern boundary of the Ray property. The second structure to the south sits between R016 and R017. Its northernmost corner is roughly 850 feet south of the southern boundary of the Ray property. The Application Rule Florida Administrative Code Rule 62B-33.008(4), entitled "Permit Application Requirements and Procedures" (the "Application Rule"), requires that the Rays' application contain certain specific information, including that identified in subsection (f): Two copies of a topographic survey drawing of the subject property. The topographic information depicted in the drawing shall be from field survey work performed not more than six months prior to the date of the application. The rule further calls for the topographic survey drawing to include specific information such as "[t]he location of any existing vegetation line on the subject property." Fla. Admin. Code R. 62B-33.008(4)(f)9. The topographic survey drawing submitted as part of the application in January of 2003 reveals a survey date of "7/17/02." Respondent's Ex. 1, Sketch of Boundary and Topographic Survey, Lots 12-15, Block 101, Avon by the Sea, Brevard County, Florida. Other than the date of the survey, the evidence at hearing did not reveal when the fieldwork in support of the survey was conducted.4 In all likelihood the fieldwork was conducted close to July 17, 2002, but obviously prior to July 17, 2002. Whether the date of the application is considered to be the date of Ms. Gumpher's certification (January 24, 2003), or the date of its receipt by DEP (January 27, 2003), it does not depict "field survey work performed not more than six months prior to the date of the application." January 24, 2003, is six months and one week after July 17, 2002. January 27, 2003, is six months and 10 days after the date of the survey. The Vegetation Line The topographic survey drawing submitted as part of the application did not meet precisely the requirements of the Application Rule in several other ways. For one, it did not label the location of "any existing vegetation line on the subject property." At hearing, the Rays submitted a revised copy of the topographic survey drawing (still dated "7/17/02"). The revision labels a line indicated on the originally submitted topographic survey drawing as "TOE OF SLOPE" (within a few feet of the top of the dune bank) as "TOE OF SLOPE AND VEGETATION LINE." Thus, it is apparent that the originally submitted topographic survey drawing depicted the vegetation line; it merely failed in its labeling of the vegetation line. The Department, once it became aware of the omission of a reference to a vegetation line in the original submission, waived the requirement for one. At hearing, Mr. McNeal testified that the waiver was authorized by subsection (7) of the Application Requirements and Procedures Rule: The Department recognizes that the requirements specified in paragraphs 62B- 33.008(4). . . (f) . . ., F.A.C. may not, due to the project circumstances, be applicable or necessary to ensure protection to the beach and dune system. In such cases, the applicant shall, as part of the application, identify those requirements and state the reason why they are inapplicable. The Department shall waive requirements that do not apply. Fla. Admin. Code R. 62B-33.008(7). There is no evidence of record that the Rays informed DEP of a position that the "location of the vegetation line" on the topographic survey drawing was a requirement inapplicable or unnecessary to ensure protection to the beach and dune system.5 Nonetheless, construing its waiver authority to be broader than authority limited to cases in which identification of inapplicable and unnecessary requirements had been made by those seeking DEP waivers, the Department waived the requirement. The waiver was based on knowledge gained from the experience of DEP employees. The employees (Mr. Tammisetti and Mr. McNeal) knew that the vegetation line would be close to the top of the dune bank line and the toe of slope line, both of which were located on the topographic survey drawing.6 Respondents' 2 supports the Department's waiver since it labels the vegetation line where the Department roughly expected it to be. Complete Dimensions and Distance Perpendicular The Application Rule further demands that the topographic survey drawing contain: 15. Accurate dimensions and locations of the foundation outlines of any structures in the immediate contiguous or adjacent areas that the applicant contends have established a reasonably continuous and uniform construction line if the permit is requested under the provisions of Section 161.053(5)(b) or 161.052(2)(b), F.S., and the distance perpendicular [the "Distance Perpendicular"] from the CCCL or 50-foot setback to the seaward corners of the foundations of any major structures . . . . Fla. Admin. Code R. 62B-33.008(4)(f). The application contained the dimensions and locations of the two (2) duplexes located on the Pope property, that is, the adjacent area to the north of the Ray property. With regard to the adjacent area to the south of the Ray property, the application contained the seaward dimensions and locations of the major structure that makes up the Discovery Beach Resort structure. The topographic survey drawing did not contain the dimensions of the complete footprint of the Discovery Beach Resort. Nor did it contain the distance perpendicular from the CCCL or 50-foot setback to the seaward corners of the foundations of all major structures depicted. Mr. McNeal noticed that required elements were missing from the application. When he made the permitting decision, he waived them pursuant to a delegation of authority from the Office of Beaches and Coastal Systems. Delegations of Authority Office of Beaches and Coastal Systems The Director of the Office of Beaches and Coastal Systems has delegated certain authority to subordinates in the Office of Beaches and Coastal Systems with respect to the CCCL permitting program. The delegations, as reflected in a document entitled "Delegations of Authority, OFFICE OF BEACHES AND COASTAL SYSTEMS" (Pope Ex. 1), is to "the Director of Office of Beaches and Coastal Systems, or his/her designee." Id., 3.a. As the administrator of the CCCL program within the Bureau of Beaches and Wetlands Resources, Mr. McNeal has been delegated authority under Delegation "OBCS-9" (id., p. 14 of 24), to "[t]ake final agency action on permit applications . . . pursuant to Sections . . . 161.053 . . ., Florida Statutes, and Rule 62B-33, F.A.C., [subject to exceptions immaterial to this proceeding.]" Id. The authority so delegated is not without limitation. Among limitations enumerated and express in the Delegations of Authority document is that "[t]the exercise of any delegated authority shall conform with all statutes and rules applicable to the DEP." Id., 3.a. Waivers Pursuant to Delegated Authority Pursuant to the authority over final agency action on CCCL permit applications, Mr. McNeal, as the head of the CCCL Program in the Office of Beaches and Shores, waived the depiction of the location of the vegetation line on the topographic survey drawing, the full dimensions of the Discovery Resort in the adjacent area to the south of the Ray property and the notation of the Distances Perpendicular. He did so because the information contained on the topographic survey drawing was sufficient, in his view, to allow the Department to perform the calculations and analyses as part of the application process that would be served by a review of the topographic survey drawing. An example has been alluded to in this order. Based on years of collective experience, Mr. McNeal and Mr. Tammisetti concluded it was reasonable to assume the vegetation line would be very near the toe of the slope line in relation to the dune bank. Their assumptions were proved correct at hearing. The dimensions and locations of the major structures located immediately north and south of the proposed project (the Pope duplexes and the Discovery Resort structure) and the Distances Perpendicular were required to be included on the topographic survey drawing, but they were not intended by the Rays to establish a Construction Line. Establishment of any such line is governed by Section 161.053(5)(b), Florida Statutes: If in the immediate contiguous or adjacent area a number of existing structures have established a reasonably continuous and uniform construction line closer to the line of mean high water than the foregoing [the CCCL], and if the existing structures have not been unduly affected by erosion, a proposed structure may, at the discretion of the department, be permitted along such line on written authorization from the department, if such structure is also approved by the department [and other conditions are met]. A Construction Line The Rays contend in their application and DEP agrees that the Four Structures establish a Construction Line. Once such a line is established provided the structures are not duly affected by erosion, the Department is conferred with the discretion to permit a proposed structure along the line seaward of the CCCL under certain circumstances. See § 161.053(5)(b), Fla. Stat. Among those circumstances, the permit "shall not contravene setback requirements or zoning or building codes established by a county or municipality which are equal to, or more strict than, those requirements provided [by statute.]" § 161.053(5)(b), Fla. Stat. Furthermore, by rule of the Department, written evidence from local government must be provided that the location of the proposed structure along a Construction Line seaward of the CCCL is consistent with the Local Comprehensive Plan. See Fla. Admin. Code R. 62b-33. Written evidence that Brevard County regards the Rays' proposed site to be consistent with Local Comprehensive Plan and not contrary to local setback requirements or zoning codes was provided by Brevard County to the Department. Establishment of a Construction Line Whether a Construction Line can be established for a proposed project is unique to the project and its coastal location. To establish such a line, the Office of Beaches and Coastal Systems may rely exclusively on information provided by the applicant for a permit to construct along such a line. The Office may also refer to its own database of aerial photographs (as it did in this case) and other data with regard to the State's coastal systems. The Construction Line running across the Ray property accepted by DEP is nearly identical to the 1981 CCCL. In contesting the establishment of the Construction Line, Mrs. Pope makes a number of points, several of which are worthy of discussion. For one, in 1993, the Department considered an administrative challenge brought by Mrs. Pope to the CCCL permit for the construction of the Days Inn Tower (now Best Western) hotel (one of the structures used by the Rays to establish a Line of Continuous Construction). See, OR-1, Pope v. Department of Environmental Protection et al., Agency Final Order dated May 9, 1994, DOAH Case No. 93-4560 (the "1993 Pope Case.) The Pope duplex had been found to be three or four blocks north of the property for which the permit was sought. If her property had been found immediately adjacent to the Days Inn Tower property, Mrs. Pope would have been accorded standing to contest issuance of the permit to the Days Inn Tower applicant. The hearing officer had recommended that Mrs. Pope not be accorded standing under the rule because her duplex property was not "immediately adjacent" to the Days Inn Tower parcel. Since Mrs. Pope's parcel was separated by at least what has been identified in this proceeding as the Ray property and the property of the Discovery Resort, she did not qualify for standing under the DEP Rule. Nevertheless, Mrs. Pope was afforded the opportunity to acquire standing by proving that her substantial interests would be affected by issuance of the permit. The hearing officer concluded that her attempt in this regard failed.7 The Department accepted the hearing officer's recommendation that Mrs. Pope be determined to have no standing, in part because her property was not "immediately adjacent" to the Days Inn Tower property. Mrs. Pope also asserts that the Four Structures along the 1981 CCCL do not establish a Construction Line on the basis of the testimony of her witness, Dr. Harris. Dr. Harris opined that the structures to be used to establish the Line of Continuous Construction, if one exists, are not the four used by DEP that are in the area of the Ray property but the structures on the two pieces of property closer to the Ray property, that is, immediately adjacent: the Pope property to the north and the Discovery Resort property to the south. The easternmost point of the structure on the Pope property is approximately 50 feet landward of the 1981 CCCL and extends approximately 100 feet seaward of the Control Line. The structure on the Discovery Resort property to the south is along the Control Line. See Respondents' 7. The line that Dr. Harris would establish does not run parallel to the shore line, the 30-year erosion line, the 1981 CCCL or the Control Line. It would run at an angle of approximately 15 degrees from the easternmost point of the Pope duplexes (the "point of beginning") about 425 feet to the easternmost point of the Discovery Resort structure. The point on the Discovery Resort structure (at the end of the line) is approximately 100 feet seaward of the point of beginning. If these structures are to be considered in the determination of whether a Construction Line exists as Mrs. Pope argues, then continuing the line to include the Four Structures would yield broken lines rather than a reasonably "uniform" and "continuous" line. The Department did not consider the structures in the property immediately adjacent to the Ray property to break the line it determined is established by the Four Structures. It ignored other structures as well between the northernmost and the southernmost of the four structures. Mrs. Pope, therefore, describes the Construction Line established by the Department as "imaginary" and without a factual basis. This point is one of opinion. The Construction Line is neither imaginary nor without a factual basis. It has a factual basis in precisely the data used by DEP: the aerial photograph that shows four major structures between Monuments R013 and R017, Respondents' 7, along the 1981 CCCL. The disregard for the Pope duplexes and the Discovery Resort structure as well as other structures in the areas north and south of the Ray property is a matter that falls within professional opinion and Department expertise. The establishment of the Construction Line is justified by the data DEP examined: Respondents' 7 (on which the Four Structures were identified and circled by Mr. Tammisetti at hearing.) The greater weight of the evidence is that DEP's determination of the establishment of the Construction Line should not be disturbed. It is, moreover, not surprising that such a line exists. One would expect that structures built after 1981 but before 1986 would be located along the 1981 CCCL and that structures that followed (such as the Discovery Resort structure) would be built along that Construction Line. Post-establishment of a Construction Line Establishment of a Construction Line does not entitle an applicant to a permit to build along that Construction Line. After a Construction Line is accepted by DEP as established, an applicant must satisfy three remaining sets of conditions expressed in Section 161.053(5)(b), Florida Statutes. Section 161.053(5)(b), Florida Statutes A discretionary exercise Once a Construction Line is established, an application for a permit to allow a proposed structure is subject to the discretion of the Department: "a proposed structure may, at the discretion of the department, be permitted along such line on the written authorization of the department, if such structure is also approved by the department." ii. Local Requirements The Department has no such discretion, however, if the construction or activity would "contravene setback requirements or zoning or building codes established by a county or municipality which are equal to, or more strict than . . . requirements [in chapter 161]." Id. To this list, the Department, by rule, has added consistency with state-approved Local Comprehensive Plans. See Fla. Admin. Code R. 62B- 33.008(4)(d). Before exercise of department discretion and inquiry into compliance with local requirements, there is a more fundamental condition that must be demonstrated by the applicant: the existing structures that establish the Construction Line must not have been unduly affected by erosion: If in the immediate contiguous or adjacent area a number of existing structures have established a [Construction Line], and if the existing structures have not been unduly affected by erosion, a proposed structure may, at the discretion of the department, be permitted along such line . . . [h]owever, the department shall not contravene [local requirements] . . . equal to, or more strict than, those requirements herein. § 161.053(5)(b), Fla. Stat. Unduly Affected by Erosion The parties differ in their view of the testimony and evidence introduced at hearing with regard to whether structures that establish the Construction Line "have not been unduly affected by erosion." Id. Neither DEP employees nor the Rays' witnesses visited the shoreline between R0-13 and R-017 to evaluate the four structures that establish the Construction Line and the effects of erosion, if any.8 Mrs. Pope asserts in her Proposed Recommended Order, "[n]o evidence or testimony was offered as to whether the structures considered by DEP were affected by erosion." Petitioners' Proposed Recommended Order, p. 24. In contrast, Respondents cite to the testimony of Mr. Boehning and Respondent's 7 with the assertion, "[t]he existing structures, which form the line of continuous construction, have not been unduly affected by erosion." Respondents' 7 supports the claim of Respondents. It reveals a distance perpendicular from the Construction Line to the dark, wet sand along the shore to be approximately 275 feet. This distance encompasses white sandy beach that is approximately 175 feet and a vegetated area that is approximately 100 feet. The finding that the structures that establish the Construction Line are not unduly affected by erosion does not mean that there are not erosion problems in the area. In fact, as found earlier in this order, the beach depicted on Respondents' 7 is "critically eroding." The stretch of beach depicted in the aerial photograph that is Respondents' 7 has undergone considerable fluctuation since 1963 through erosion and beach nourishment. From 1972 to 2002, for example, the location of the mean high water line at R-015, the monument closest to the Pope and Ray properties, has varied by 206 feet from a low in September of 1972 to a high of 369.3 feet in April of 2001. Dr. Harris wrote this in a report introduced into evidence: The beach profile data show that at R-15 the beach and dune are subject to erosion. From 1972 to 2002 the variation in the MHW shoreline position was 206 feet. Beach nourishment and inlet sand by-passing operations were performed between some of the time periods, and are largely responsible for the periodic beach and dune widening. Even with the beach nourishment project, dune erosion continues to be a problem, and although the recent beach nourishment project greatly widened the beach, the position of the dune remained the same. The FDEP design wave height elevation for a 100-year storm is 14.2 feet NGVD for R-15, which is higher than the existing dune elevation. This means that the upland properties would experience storm surge, flooding and wave action during a 100-year storm. Pope 16. Projects of beach nourishment (placement of sand through human activity) were performed in 1972, 1986 and 2001. The need for beach nourishment and re-nourishment reinforces the status of the beach near R-015 as "critically eroding" and underscores the importance of protecting as much of the dune system as possible. That the beach is critically eroding is not inconsistent with a finding that the structures that establish the Construction Line are not unduly affected by erosion. Whether or not due to the 1986 and 2001 nourishment projects, the evidence of record is that, despite the status of the beach as critically eroding, the structures that establish the Construction Line are not unduly affected by erosion. Not Contrary to Local Requirements On December 30, 2002, a site-plan approval was issued by Brevard County with regard to "RAY CONDOS aka MICHELINA CONDOMINIUM" with a site address of "420 Harding Avenue, Cocoa Beach, FL 32931." Respondents' 1, Vol. 1, Tab 12, second page. Signed by the designee of the Director, Permitting and Enforcement, the development order is entitled, "BREVARD COUNTY LAND DEVELOPMENT SITE-PLAN APPROVAL" and contains the following: The site plan to which this approval is attached has been reviewed by affected County divisions, departments and agencies and has been determined to comply in general with the Brevard County Code of Ordinances and Comprehensive Plan Elements. * * * It is the responsibility of the Owner/Engineer of Record to contact Office of Natural Resources for a Land Clearing/landscaping Permit Two (2) sets of As-Built drawings must be provided to Land Development prior to the Issuance of a C.O. Id. The development order concludes with a statement related to the vested right of the Rays to develop in accord with the site plan: If a Certificate of Occupancy has not been issued for the principal structure by Dec. 30, 2005 the three (3) year vesting period, beginning with the date of site development plan approval, expires and said site plan shall become Null and Void. Only those phases of the development that have an active and valid building permit may be completed after the three-(3) year time period. Id. The reference in the site-plan approval to the "Brevard County Code of Ordinances" does not include building codes. The reference covers local setback requirements and zoning codes. Mrs. Pope appealed the issuance of the site-plan approval to the Brevard County Board of County Commissioners (the "Board"). Her appeal was heard over three meetings of the Board on May 6, 2003, June 8, 2003, and August 12, 2003. At the conclusion of the August 12, 2003, proceedings on the appeal, the Board voted unanimously to accept the staff recommendation to deny the appeal. An unnumbered resolution of the Board "DENYING THE APPEAL OF JAMES AND CAROLE POPE . . . PERTAINING TO THE MICHELINA CONDOMINIUM SITE PLAN" was produced by Mrs. Pope at the hearing together with the following statement of a Deputy Clerk for the Board: This is to advise that the Office of the Clerk to the Board of County Commissioners does not have any correspondence indicating a copy of the Findings of Fact on Michelina Condominium was forwarded to Mr. or Mrs. Pope. Pope 7. The resolution is signed by the Chairperson of the Board. Immediately below the signature block there appears the following: "(As approved by the Board on August 12, 2003)." Pope 8. The document is not stamped received by the Clerk of the Board or the County Clerk's Office, nor is there other clear indicia that the order has been rendered through a filing with the Clerk's office. On its face, however, appears an undated attestation of a deputy clerk under a seal of Brevard County that appears to attest to the Chairperson's signature. As of the dates of the final hearing in this proceeding, Mrs. Pope had not sought judicial review of the decision of the Board. At hearing, on the strength of the signed resolution denying Mrs. Pope's appeal of the site-plan approval and the site-plan approval, itself, and the apparent finality of the approval, Mrs. Pope was ruled estopped from presenting evidence that the Permit contravened local setback or zoning requirements or was inconsistent with the Local Comprehensive Plan. The establishment of a Construction Line, that the structures establishing the line are not unduly affected by erosion, and the collateral estoppel of Mrs. Pope's claim that construction or activity seaward of the Control Line along the Construction Line is contrary to local requirements, clears the way for the exercise of Department discretion as to whether to issue the permit. Department Discretion The Department's exercise of discretion must, of course, take into consideration the beach and dune system within the fixed coastal cell in which Ray property and the Pope property are located. No other conclusion could be gathered from the statements of legislative intent and the statutory scheme. Lest there be any misunderstanding, the Department has codified its policy statement on such matters: (1) The beach and dune system is an integral part of the coastal system and represents one of the most valuable natural resources in Florida, providing protection to adjacent upland properties, recreational areas, and habitat for wildlife. A coastal construction control line (CCCL) is intended to define that portion of the beach and dune system which is subject to severe fluctuations caused by a 100-year storm surge, storm waves, or other forces such as wind, wave, or water level changes. These fluctuations are a necessary part of the natural functioning of the coastal system and are essential to post-storm recovery, long term stability, and the preservation of the beach and dune system. However, imprudent human activities can adversely interfere with these natural processes and alter the integrity and functioning of the beach and dune system. The control line and 50-foot setback call attention to the special hazards and impacts associated with the use of such property, but do not preclude all development or alteration of coastal property seaward of such line; Fla. Admin. Code R. 62B-33.005, Department Policy Statement on Permits. The exercise of this discretion is guided by criteria under rule. Among those criteria are those found in 62B- 33.005(4)(g): The construction will not cause a significant adverse impact to marine turtles, immediately adjacent properties, or the coastal system unless otherwise specifically authorized in this rule chapter. Chapter 62B-33, Florida Administrative Code, defines the term "Impacts" to include separate definitions for the terms "Adverse Impacts," "Significant Adverse Impacts," "Minor Impacts," and "Other Impacts": "Impacts" are those effects, whether direct or indirect, short or long term, which are expected to occur as a result of construction and are defined as follows: "Adverse Impacts" are impacts to the coastal system that may cause a measurable interference with the natural functioning of the system. "Significant Adverse Impacts" are impacts of such magnitude that they may: Alter the coastal system by: Measurably affecting the existing shoreline change rate; Significantly interfering with its ability to recover from a coastal storm; Disturbing topography or vegetation such that the system becomes unstable or suffers catastrophic failure; . . . * * * (d) "Other Impacts" are impacts associated with construction which may result in damage to existing structures or property or interference with lateral beach access. Fla. Admin. Code R. 62B-33.002(30). Minimization of Impacts and No Significant Adverse Impacts The site selected on the Ray property for the proposed project poses impacts to Mrs. Pope's duplexes during a storm event such as a 100-year storm. Because of the shore- parallel dimension of the proposed structure (84 feet), storm- generated waves and storm surge would be concentrated into the relatively narrow gap between the proposed structure and the duplexes. The resulting hydrodynamic load would cause scouring of the foundations of the duplexes. The proposed project has "frangible" or "breakaway" ground level walls. They would pose the potential for generating waterborne missiles that, hydro-dynamically propelled, would damage the duplexes. The proposed project was designed in accordance with the American Society of Civil Engineers 7 Code ("ASCE-7") and most pertinently (since referenced in the Construction Line Statute), the Florida Building Code. But the Building Code does not take into consideration a proposed structure's design or proposed site on an adjacent property or the adjacent property's structures. The proposed project, moreover, is not designed and sited to mitigate aerodynamic loading on Mrs. Pope's duplexes. During high-wind conditions, there will be a number of wind effects on the duplexes caused by the proximity of the proposed project: gust loading, high turbulence shedding, and vortex shedding among others that can be reasonably expected to cause structural impacts to the duplexes such as suction loads on roofs and eaves, flying debris and window breakage. The proximity of the proposed structure to the Pope property will have a shading effect that will cause adverse impacts on the growth of native coastal vegetation on the Pope property. As a result, there will be a reduction in the interception of wind-driven sand by the vegetation that enables it to develop healthy, deep root systems that add to dune stability.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: an impacts assessment be conducted as required by Florida Administrative Code Rule 33.005(3)(a); that the proposed project be re-sited to mitigate the impacts that its siting now poses to the Pope Property and the Popes' duplexes; that the proposed project be permitted to be constructed up to the Construction Line, provided that the permit is supported by both the impacts assessment and a re- siting of the proposed project to mitigate wind, water and shading impacts; and if the proposed project is not supported by an adequate impacts assessment, or if it cannot be re-sited to mitigate the impacts to the Pope Property, that the permit be denied. DONE AND ENTERED this 2nd day of March, 2004, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2004.

Florida Laws (7) 101.49120.569120.57161.011161.021161.052161.053
# 1
MANASOTA-88, INC. vs CITY OF BRADENTON AND DEPARTMENT OF COMMUNITY AFFAIRS, 89-006723GM (1989)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Dec. 06, 1989 Number: 89-006723GM Latest Update: May 12, 1992

Findings Of Fact Background Petitioner is incorporated in the State of Florida as a not-for-profit corporation. The corporate purpose of Petitioner includes the improvement of environmental health. Petitioner's activities in this regard are especially focused upon Manatee and Sarasota Counties, including the City of Bradenton (Bradenton). Petitioner has about 2500 members. Members of Petitioner reside in Bradenton. These persons use the water and roads adjacent to Perico Island. Insubstantial evidence suggests that Petitioner, through its members, submitted oral objections to Bradenton at anytime during the planning process. Petitioner mailed a letter dated March 7, 1989, to the Department of Community Affairs (DCA) with a copy sent to Bradenton. The letter clearly constitutes written objections to the proposed plan. Bradenton initially received the March 7 letter on March 9. It is difficult to determine whether Bradenton received a copy of the March 7 letter after the issuance of the Objections, Recommendations, and Comments (ORC) by DCA. Even if Bradenton received a copy of the March 7 letter prior to the issuance of the ORC, it is impossible to determine if Bradenton received another copy of the letter with the ORC, which may contain numerous attachments consisting of the comments of other parties. The ORC was not introduced into evidence. The only indication in the record, including pleadings, of the date of the ORC is in Exhibit 2 attached to the Deposition of Robert Pennock, which itself is City Exhibit 6. Exhibit 2, which is a letter from DCA to Bradenton, mentions the ORC dated March 17, 1989. This date would be at the outside of the range for DCA to submit an ORC in response to a proposed plan transmitted, as in the present case, on November 23, 1988. 9/ By Request for Admission served November 21, 1990, Petitioner requested Bradenton to admit: "that [Petitioner] submitted written objections to [Bradenton's plan] which [Bradenton] received after it received DCA's ORC report." Bradenton's response to the request, in its entirety, states: The City has received a copy of the correspondence relating to possible "objections" to the City's Plan that were mailed directly to [DCA]. The date of that correspondence was March 7, 1989 and addressed to Robert G. Nave, Chief, Bureau of Local Planning, and was written by Attorney Thomas W. Reese. By date stamp on the copy of the correspondence in the possession of the City, it is believed that the document was received on March 9, 1989. The City does not admit that the correspondence of March 7, 1989 from Mr. Reese to Mr. Nave meets the intent of the statute for establishing standing and to the contrary, does not comply and does not establish such standing. The response ignores the portion of the request directed toward the factual question of the order in which Bradenton received the March 7 letter and the ORC. The significance of the chronology, as opposed merely to the acknowledgement of receipt of the March 7 letter, may have been lost upon Petitioner's counsel, who inexplicably asserted in opening statement that the ORC was issued on December 19, 1988. Transcript, page 57. Given the probable chronology of events recited in the preceding footnote, one of the few certainties concerning this matter is that the ORC was not issued on December 19, 1988. Intervenor is a Delaware corporation that owns property in Bradenton. Intervenor owns the western peninsula of Perico Island, which is described in detail below. Intervenor submitted oral or written objections to Bradenton not later than the transmittal hearing on November 23, 1988. Prior to transmitting the proposed plan to DCA, Bradenton removed the coastal high hazard designation from much of the western peninsula of Perico Island and changed the designation of the affected land to ten units per acre. Bradenton is a municipality located in western Manatee County. The city, which straddles the mouth of the Braden River to the east, generally lies along the southern bank of the Manatee River less than three miles upstream from where it empties into lower Tampa Bay. Wares Creek runs from south to north through the center of Bradenton and empties into the Manatee River. Palma Sola Bay divides the majority of the city from Perico Island. The southern half of Perico Island, which consists of eastern and western peninsulas, is within the city limits. Perico Island, which is generally bounded on the west by Anna Maria Sound and Sarasota Pass, is located between Tampa Bay to the north and Sarasota Bay to the south. Barrier islands to the west, most notably Anna Maria Island, tend to protect Bradenton from direct Gulf waves. On August 1, 1989, Bradenton adopted its comprehensive plan (Plan). As Bradenton noted accurately in its cover letter to DCA, no DCA representative attended the final adoption hearing on July 26, 1989, although Bradenton had requested that DCA send a representative to the hearing. 10/ On September 16, 1991, DCA issued a notice of intent to find the Plan in compliance. Designation of Coastal High Hazard Area Data and Analysis The Data and Analysis 11/ contains a Coastal Area Map, which is on page 150 of the Plan. The map depicts those areas below two feet elevation as the Coastal High Hazard Area. The map shows that the Coastal High Hazard Area includes about one-half of the western peninsula of Perico Island and relatively thin strips along the south and east borders of the eastern peninsula of Perico Island. The only other portions of Bradenton designated as Coastal High Hazard Area are parts of islands in the Braden River and two small parcels on the west bank of the Braden River. The Data and Analysis does not further address the Coastal High Hazard Area. In particular, the Data and Analysis fails to explain why the two-foot elevation was selected to define the Coastal High Hazard Area. The Data and Analysis does not mention the location of the Federal Emergency Management Agency velocity zone (V-zone) or the Department of Natural Resources Coastal Construction Control Line. The portion of Perico Island within the city is bounded on the north by State Road 64. Immediately north of State Road 64, the remainder of Perico Island is in unincorporated Manatee County. The Manatee County comprehensive plan designates the entire island north of the road as coastal high hazard area. However, the county plan notes extends the coastal high hazard area to the five- foot contour. The county plan also divides the coastal high hazard area into two areas: the more critical area, which corresponds to the V-zone, that is subject to wave action and the less critical area that is subject to storm- induced damage. Some testimony suggests that the Manatee County plan has more stringent land use constraints for land uses within the V-zone than for land uses elsewhere within the county's coastal high hazard area. Nothing in the record indicates the extent of the V-zone over any part of Perico Island. Early in the consideration by the City Council of the proposed plan, the coastal high hazard area included all land seaward of four feet elevation. The four-foot contour had been selected because of data suggesting that the "spring high tide" runs to an elevation of 3.62 feet, which was rounded up because Bradenton had only one-foot contour maps. By letter dated November 16, 1988, a representative of Intervenor complained that the four-foot contour was "scientifically unjustified and legally unsupportable." The letter states: Only a portion of the westerly peninsula is in the [V-zone] and even that portion of the property could be partially used with proper construction safeguards. The staff position of four feet seems to be based upon the fact that spring high tide occurs at elevation 3.56 feet but no one knows where that elevation occurs on this property nor does anyone know where the elevation 4.0 feet occurs on this property. The relationship between spring high tide and coastal high hazard is likewise unestablished. Bradenton's Chief of Planning and Zoning, Margaret Swanson, testified that the two-foot contour line "definitely" includes the entire V-zone. Deposition of Margaret Swanson, page 48. Jerry West, Bradenton Planning and Development Director and Ms. Swanson's supervisor, testified likewise at the hearing. Transcript, page 90. Petitioner produced no contrary evidence as to the location of the V- zone or the Coastal Construction Control Line. Likewise, there is no evidence that either peninsula has historically experienced destruction or severe damage from storm surge, waves, erosion, or other manifestations of rapidly moving or storm driven water. The spring high tide appears to be an unusual event, perhaps even occurring less often than annually. The evidence fails to link the spring high tide with destruction or severe damage from rapidly moving or storm driven water anywhere in Bradenton. Plan Provisions Coastal Management/Conservation Element (Coastal) Goal 5 states: Use of coastal areas in a way which preserves natural systems, provides for public access, and minimizes storm and flood hazards to population and property, including public facilities. Objective 1: Severely limit development in low lying coastal areas. Policy 1: A coastal high-hazard area shall be established through the Land Use and Development Regulations to include all coastal lands along the Braden and Manatee Rivers and Palma Sola Bay which are below 2 feet in elevation. Policy 2: Establish a conservation zone including all conservation lands as shown on the Future Land Use Map and all undeveloped areas below the Coastal High Hazard Line (2-foot contour line) and prohibit construction of building, roadways and parking areas in that zone except to provide shoreline access points as determined necessary or of overriding public interest by City Council. . . . Policy 3: Prohibit the filling of coastal areas below the 2-foot contour line except in cases where such lands are completely separated from the shoreline by land of higher elevation or where determined necessary or of overriding public interest by City Council. Policy 4: The City shall not locate infrastructure in the Coastal High Hazard Area (below the 2-foot contour line) except as determined necessary or of overriding public interest by City Council. * * * Objective 5: Keep population and investment low in areas vulnerable to coastal flooding. Policy 1: Designate undeveloped coastal acreage with areas below the 8-foot elevation contour line as PDP (planned development project) and limit residential development to low density below the 8-foot contour. Limit non-residential development below the 8-foot contour line to water dependent uses. Policy 2: Locate all public facilities outside of the coastal high hazard area. * * * Policy 4: Discourage the location of high density residential projects, public housing, housing for the elderly, mobile homes and group homes in high priority hurricane evacuation zones through the Land Use and Development Regulations. The Future Land Use Map (FLUM) designates as Conservation all of the land on Perico Island below the two-foot contour. According to Policy 1 under Objective 1 of the Future Land Use Element (FLUE), the "Recreational/Conservation" designation is for "[p]arks, designated open areas and conservation." No residential uses are permitted in the Recreation/Conservation category. The only FLUE goal is: A land use pattern which promotes the well being of the community in regard to compatibility of adjacent uses, building types and residential densities, efficiency of utilities and roadways, harmony with the natural environment and protection from natural hazards. Objective 1: Location of new development and redevelopment in a manner conducive to compatibility of land uses, sensitive to natural resources and natural hazards and consistent with the availability of public facilities. * * * Housing Element (Housing) Policy 1 under Objective 1 is: Designate vacant tracts of land for residential use on the future land use map except where unsuitable for that use because of incompatible adjacent existing uses, inappropriate elevation or drainage conditions or other safety hazard. State Plan Provisions There are no relevant provisions of the State Plan with which the Coastal High Hazard Area is arguably inconsistent. Designation of Ten Units Per Acre on Western Peninsula of Perico Island Data and Analysis The Data and Analysis identifies Perico Island and the islands of the Braden River as the two areas of major environmental concern in Bradenton. The Data and Analysis states: The value of these lands is that they are coastal lands with abundant sea life and habitat. In an urbanized area where much of the natural shoreline has been destroyed, these remaining lands should be protected because of their intrinsic value as well as because of their dwindling supply. Plan, page 157. The Data and Analysis notes that Perico Island is entirely within the 100-year flood zone and is less than five feet above sea level with "large areas" below the mean high water line. The western peninsula of Perico Island is lower than the eastern peninsula. The highest elevation on the western peninsula is five feet, which is within 100 feet of State Road 64. The elevation of most of the upland beyond 100 feet of the road is less than three feet. The elevation of much of the interior of the eastern peninsula is 3-4 feet. Although Perico Island contains Australian Pine and Brazilian Pepper, which are nuisance exotics, the Data and Analysis explains that valuable natural habitat remains: A great diversity of animal and plant life is found on the island[, including roseate spoonbills, brown pelicans, osprey, and an occasional bald eagle]. The mangrove swamps, mud flats, and marine grass flats fringing Perico Island support a variety of marine life including commercial and game fishing species such as mullet, trout, redfish, and snook, as well as shellfish. Plan, page 158. The habitat of the endangered West Indian Manatee includes the coastal areas in question. In addition to the above-noted animal species that are listed as endangered, threatened, or of special concern, the threatened butterfly orchid is also found on Perico Island. The Data and Analysis reports that Palma Sola Bay is a Class II waterbody, which means that it is suitable for shellfishing. Although it has not been approved for such purpose, its waters regularly satisfy Class II standards with only an occasional violation of the Class II bacteriological standards. According to the Data and Analysis, Palma Sola Bay has been designated as part of the Sarasota Bay Estuary of National Significance. Plan, page 98. Both Anna Maria Sound and Palma Sola Bay are part of the Sarasota Bay estuarine system and, as such, are Outstanding Florida Waters. 12/ Concluding its discussion of the two areas of major environmental concern to Bradenton, the Data and Analysis states: As with Perico Island, the Braden River and its wetlands are an invaluable natural resource. Such tidal wetlands not only reduce water pollution by filtering pollutant-laden runoff, but also influence water quantity by retaining water during dry periods and absorbing it during flooding. Wetlands also stabilize the shoreline and act as a hurricane buffer. They provide essential breeding, nesting, resting areas for myriad fish and bird species and support a diverse food web extending to terrestrial animals as well. ... Plan, page 159. The Coastal Vegetation map shows that the portion of the western peninsula corresponding roughly with the Coastal High Hazard Area is vegetated by coastal wetlands with considerable mangrove growth. Plan, page 151. Perico Island is one of "three areas where future development will impact the coastal area." Plan, page 160a. The Data and Analysis notes that an historic shell mound on the western peninsula must be "protect[ed from r]esidential development." However, the designation of the western peninsula at ten units per acre, as necessarily conceded by Mr. West, is not a low density. The Data and Analysis surmises that the impact of future development on at least the eastern peninsula of Perico Island is largely unavoidable: Because of a Development Order issued on a 1975 Development of Regional Impact application, the conditions of development are established and little can be done to modify them to meet the policies of this plan. Id. The Data and Analysis describes the 1975 development order as: authoriz[ing] 1512 dwelling units and a neighborhood commercial center and call[ing] for the preservation of lands below the 1.5 foot elevation and in an historic shell mound on the western peninsula of the site. Development of the western peninsula was prohibited by the approval stipulations. Plan, page 158. At the time of the application for what is known as the Spoonhill Bay DRI, Intervenor or an affiliate of Intervenor owned both peninsulas. After obtaining the development order, Intervenor sold all or part of the eastern peninsula to developers, but retained the western peninsula. The application for development approval was for a total of 1776 units on 102.6 acres. The entire land area was about 546 acres with 171 acres of mangroves conservation, 200 acres of marine conservation, 10 acres of historic preservation, almost 2 acres of neighborhood commercial, 26 acres of lakes, and 35 acres of other open space and recreation. The map accompanying the application shows two sites for historic conservation, both evidently above the two-foot contour line. According to the DRI application, both peninsulas of Perico Island contain about 184 acres above the 1.5-foot contour. The western peninsula encompasses 114 acres with about 10-16 acres higher than 1.5 to 2 feet in elevation. According to the application, the dwelling units per gross acre would be 3.2 and the dwelling units per net acre would be 9.7. The gross acreage density is based on total acres, including mangroves, lakes, and marine conservation. The net acreage density is impossible to calculate from the information provided. 13/ The development order, which was approved May 28, 1975, by the Bradenton City Council, approves the development subject to the following conditions: The developer shall initiate a positive program for the long run protection of the ecologically important undeveloped areas of the site. . . . * * * 3. The applicant shall work in consultation with the State Division of Archives, History and Records Management to insure the protection and preservation of the two sites of historical and archaeological significance found on the project site. Protection of the Indian Mound area shall be by deed, dedication, or other appropriate legal instrument to insure that such sites are preserved in perpetuity. * * * 5. With respect to responsibility for roadway improvements outlined in the transportation section of the DRI report: * * * (d) To further reduce traffic impact of the project, no residential development as originally proposed by the developer will be carried out on the westerly peninsula of the developer's property. ... Total number of residential units as proposed shall be reduced by 15% from 1,778 units to 1,512 units, all to be located on the easterly peninsula. * * * 7. Developer shall furnish at no cost to City not less than one acre site to accommodate governmental services that will be generated by the development, e.g., fire, police, etc. Site location shall be subject to approval of both parties. The Data and Analysis includes among "acreage not presently slated for development . . . 10 acres, western peninsula, Perico Island[,] includes Mangrove areas, low-lying areas and an Indian shell mound." Plan, page 12. However, the Data and Analysis determines that this area is "suitable for development," which means that the land is "above mean high water line and is served by public facilities." Plan, page 14. The soils map shows that the entire western peninsula, as well as the western half of the eastern peninsula, is characterized by nearly level, very poorly drained sandy and organic soils in tidal mangrove swamps. Plan, page 13. The soils of the western peninsula and western half of the eastern peninsula of Perico Island, as well as the soils of the Braden River islands, are the only soils in Bradenton that are generally "very poorly drained" and account for very little of the land area of the city. Both peninsulas of Perico Island are identified as Neighborhood 12.04 in the Plan. In the discussion of Neighborhood 12.04, the Data and Analysis states that a condition of the development order "was that the smaller of the two peninsulas is not to be developed because of environmentally sensitive and historically significant areas as well as traffic impacts." Plan, page 97. The Data and Analysis notes that the two shell middens, which date from "prehistoric times," have been damaged by erosion and amateur excavation. But the Data and Analysis recommends that the Indian mounds be professionally excavated or protected "because of their potential value in adding to the small amount of information available about prehistoric settlements in this area." Plan, page 97. The Data and Analysis notes that approved development has provided 600 units through 1986 at a density of 6.3 units per acre. As of that time, 116 acres were in residential use, one acre in commercial use, and 70 acres were vacant. The Data and Analysis projects that 800 units will have been constructed by 1990. In discussing Neighborhood 12.04, the Data and Analysis reports that no public recreation areas are proposed for the development, which will be served exclusively by private recreation areas. In addition, State Road 64 is the hurricane evacuation route for Perico Island as well as Anna Maria Island, which is also served by another escape route. The discussion of Neighborhood 12.04 concludes with several recommendations. Among them are the following: Require the preservation of and protection of the historic shell middens on the western peninsula if the peninsula is ever developed. Strictly enforce the flood protection ordinance for development of the island. Require mangrove and water quality protection as part of development approvals. Hurricane evacuation and traffic impacts on State Road 64 shall be considered as an important issue in review of applications for development approval. Any applications by property owners to increase the density of development in the neighborhood shall be denied. Participate in the studies of Sarasota and Palma Sola Bays under the National Estuary Program and utilize the recommendations coming forth from that program to the extent possible. Nothing in this Plan shall limit or modify the rights of any person to complete any development that has been authorized as a development of regional impact pursuant to Chapter 380 or who has been issued a final local development order, and development has commenced and is continuing in good faith. Any amendments to the development order for the Development of Regional Impact shall comply with or require compliance with all of the policies of this plan particularly those concerning protection of environmentally and historically sensitive lands, the coastal high hazard area and hurricane vulnerability zone. Plan, pages 98-99. The Evacuation Map shows that all of Perico Island is in Evacuation Zone A. Plan, page 153. This is the highest priority evacuation zone in Bradenton. This zone also encompasses bands of land along the Manatee River and both shorelines of the Braden River. Additional data and analysis are included in the Surface Water Improvement and Management Program for Tampa Bay published on August 30, 1988 (SWIM Plan). The SWIM Plan notes that the Tampa Bay estuary, of which Anna Maria Sound, Palma Sola Bay, and the Manatee and Braden Rivers are a part, suffers from interconnected problems, including habitat destruction (e.g., dredging, filling, hardened shorelines); water quality inclusive of eutrophication (e.g., point and non-point stormwater runoff, municipal and industrial effluents, septage); [and] altered freshwater inputs (e.g., dams, withdrawals). SWIM Plan, page 1. Addressing the functions of area wetlands, the SWIM Plan states: In addition to their contributions to the biology of the marine ecosystems, coastal and estuarine wetlands play an important role in modifying the geologic and hydrographic characteristics of the area. Acting as baffles, roots and leaves reduce the velocity of water over the bottom causing suspended particles to settle out and become trapped at the base of the plants. In this way mangroves, marshes, and seagrasses reduce turbidity, increase sedimentation rates, stabilize sediments, and attenuate wave action on adjacent shorelines. The binding and stabilization characteristics of these habitats are documented by reports of some coastal marshes and seagrass meadows surviving the destructive scouring forces of coastal storms and hurricanes in the Gulf states. SWIM Plan, page 23. However, these wetland systems "face increasing pressure from development of all types," notwithstanding the Warren S. Henderson Wetlands Protection Act of 1984. SWIM Plan, page 27. The water quality is directly threatened by the nutrients introduced into the water by, among other things, untreated stormwater runoff and the "extensive transformation of rural uplands to urban uses." SWIM Plan, pages 26-27. Plan Provisions The FLUM contains only two residential categories. All of Perico Island above the Coastal High Hazard Area is designated "Residential--maximum 10 units per acre." The other category permits up to 15 units per acre. FLUE Policy 1 under Objective 1 describes the Residential categories as follows: Residential with densities limited to 15 units per acre in the high density area and 10 units per acre in the moderate density area and limited by recommendations by neighborhood in this plan. . . . Neighborhood commercial uses permitted as part of the residential development plan. .. . FLUE Policy 2 under Objective 1 is: The recommendations for each neighborhood contained in this plan are hereby adopted as part of this plan and are to be adhered to in all land use decisions to be made by the City. FLUE Policy 3 under Objective 1 states: The future land use map, neighborhood recommendations and all other relevant policies under this plan are to be used as a basis for the revision of the land use and development regulations, including the zoning atlas. FLUE Objective 3 provides: Management of future development through adoption and enforcement of regulations which promote the use of land in a manner sensitive to public health and safety and to soils and topography. FLUE Objective 4 and relevant policies are: Objective 4: Limitation of population in first priority hurricane evacuation zones identified in the local and regional hurricane evacuation plan. Policy 1: Deny requests for increases in density on property approved for development if the property is located in the first priority regional hurricane evacuation zone. Policy 2: On the Braden River islands, designate as conservation area all lands below the 2 ft. contour line, and allow only recreational/open space or residential use at a gross density maximum of 3 units per acre on the uplands. Coastal Goal 2 is "[i]mprovement of surface water quality." Objective 1 is: "Preservation of water quality cleansing and erosion control capabilities of natural, vegetated shorelines." Policy 4 is to "[r]equire by ordinance by December 1, 1989 best management practices for erosion control during and after land alteration projects." Coastal Objective 2 under Goal 2 is: "Reduction of pollutant loads reaching waterways from urban stormwater." Policy 2 defers to land development regulations the job of establishing standards for new developments to "provide on-site detention and filtration of stormwater runoff to remove oils, silt, sediment, nutrients, and heavy metals, and [to] require erosion control during construction." Coastal Goal 4 provides: "Protection and enhancement of wildlife habitat and vegetation." Objective 1 deals with the Braden River estuary and islands and includes policies restricting development to uplands, generally prohibiting the removal of wetlands vegetation, and requiring that development proceed as a planned development project "to ensure site-sensitive planning and review." No similar provisions apply to Perico Island. Coastal Objective 2 under Goal 4 is: "Preservation of wetlands, including coastal wetlands vegetation, living marine resources and wildlife habitat." Policy 1 states: "[b]y December 1, 1989 adopt regulations to prohibit the removal of wetland vegetation except for limited access points." Policy 2 is, "[b]y December 1, 1989 require that development approvals for land with wetland area stipulate wetland protection measures to ensure that upland construction and land use do no affect the wetlands." Policy 3 states: "[b]y December 1, 1989 adopt regulations to require the identification of wildlife habitats as part of planned development project applications and . . . provide mechanisms to require protection of valuable habitat." Policy 5 provides: "[b]y December 1, 1989 adopt regulations to limit disturbance of seagrass beds by prohibiting development and land uses in seagrass areas and where they will result in an increase in boating in seagrass areas except where necessary to maintain existing facilities." Policy 7 is to develop with Manatee County a management plan for the Braden River estuary, Manatee River, and Palma Sola Bay. Policy 8 is to adopt by ordinance, within six months of their issuance, the recommendations of the Sarasota Bay National Estuary Program. Coastal Goal 6 is: "Fast evacuation prior to natural disasters such as hurricanes." Objective 1 is a "workable evacuation plan, geared toward maintaining present evacuation times." Goal 4 of the Public Facilities Element (PFE) provides: "Prevention of flood damage and improvement of surface water quality." PFE Objective 1 under Goal 4 sets forth the following provisions concerning drainage level of service standards. Policy 1a. The peak discharge rate from new development shall be equal to or less than the peak discharge rate that existed prior to development based on a 25-year frequency, 24-hour duration storm event. * * * Policy 1c. Internal or on-site drainage facilities of developments shall be designed to accommodate the stormwater resulting from a design storm of 10-year frequency, critical duration, based on the project site's time of concentration. Policy 2: The applicability of the level of service standards to various types and sizes of private development shall be set forth in the land use and development regulations adopted by December 1, 1989. PFE Objective 4 under Goal 4 is: "Nondegradation of capacity of natural drainage features." Policy 1 states: All new developments shall be required by land use regulations adopted by December 1, 1989 to provide stormwater retention and drainage facilities to curb increased runoff to natural drainage features. PFE Objective 5 under Goal 4 is: "Upgrading of existing drainage facilities to meet future needs." Policy 1 states: Stormwater facility improvements as proposed in the Comprehensive Stormwater Management Study, 1981 and subsequent updates shall be scheduled into the Capital Improvements program. 14/ State Plan Provisions The relevant provisions of the State Plan are set forth in Findings of Fact Paragraphs 74 et seq. Stormwater Provisions Plan Provisions Already cited above, PFE Goal 4; PFE Objectives 1, 4, and 5, as well as various policies under these objectives; Coastal Goal 2, Objective 2 under Goal 2, Policy 2 under Objective 2; and Housing Policy 1 under Objective 1 address stormwater and drainage. PFE Goal 1 is: Provision of public facilities in a manner which protects investments in existing facilities, promotes orderly, compact urban growth, and promotes the quality of natural resources, particularly surface waters. PFE Objective 1 and Policy 1 under Goal 1 are to maintain the applicable level of service standards for public facilities and not to issue development orders if the issuance would result in a violation of a level of service standard. PFE Objective 2 under Goal 4 is: "Correction of existing stormwater facility deficiencies by the year 2010." Policy 1 is: Stormwater facility improvements as proposed in the Comprehensive Stormwater Management Study 1981 hereby adopted as an appendix to this plan and subsequent updates shall be scheduled into the Capital Improvements program. PFE Objective 3 under Goal 4 is: "Water conservation through use of stormwater runoff for irrigation." SWIM Plan Provisions The SWIM Plan provides as follows with respect to water quality: Initiative 1. Reduce point and non-point source pollutant loadings to attain water quality necessary to restore and maintain healthy and productive natural systems, protect human health, and . . . attain the highest possible water use classification. * * * 1.c. Urban Stormwater Management Strategies: --Reduce the levels of nutrients and other contaminants in urban stormwater runoff by requiring, if feasible, that the quality of stormwater discharges be no worse than the State water quality criteria or the existing quality of the receiving water body, whichever is better. The feasibility of implementing this objective will be examined through a review of federal, state, District, and local rules pertaining to stormwater management. * * * --For all new upland development or redevelopment within the Tampa Bay watershed, runoff rates should not exceed those of natural, undisturbed conditions. The feasibility of implementing this objective will be examined through a review of federal, state, District, and local rules pertaining to stormwater management. Perico Island, Anna Maria Sound, and Palma Sola Bay, as well as the Manatee and Braden Rivers, are within the jurisdiction of the Southwest Florida Water Management District's SWIM program for Tampa Bay. State Plan Provisions Section 187.201(8) addresses water resources. The goal is to "maintain the functions of natural systems and the overall present level of surface and ground water quality." Policy 8 is to "[e]ncourage the development of a strict floodplain management program by state and local governments designed to preserve hydrologically significant wetlands and other natural floodplain features." Policy 12 is to "[e]liminate the discharge of inadequately treated wastewater and stormwater runoff into the waters of the state." Section 187.201(9) addresses coastal and marine resources. The goal includes ensuring that development does not "endanger . . . important natural resources." Policy 4 is to "[p]rotect coastal resources [and] marine resources from the adverse effects of development." Policy 6 is to "[e]ncourage land and water uses which are compatible with the protection of sensitive coastal resources." Policy 7 is to "[p]rotect and restore long-term productivity of marine fisheries habitat and other aquatic resources." Section 187.201(16) addresses land use. The goal is to direct development to those areas that have, among other things, the "land and water resources . . . to accommodate growth in an environmentally sensitive manner." Policy 6 is to "[c]onsider, in land use planning and regulation, the impact of land use on water quality and quantity; the availability of land, water, and other natural resources to meet demands; and the potential for flooding." Section 187.201(22) addresses the economy. The goal is to "promote an economic climate which provides economic stability, maximizes job opportunities, and increase per capita income for its residents." Policy 3 is to "[m]aintain, as one of the state's primary economic assets, the environment, including clean air and water, beaches, forests, historic landmarks, and agricultural and natural resources." Historic Provisions Data and Analysis The Data and Analysis discloses that 85 structures in Bradenton were added to the Florida Master Site File following an historic survey in 1980. As a result of the survey, two historic districts were established: Downtown Bradenton and Old Manatee. The Data and Analysis reports that the Braden Castle ruins and Braden Castle Tourist Camp are included on the National Register of Historic Places. Plan Provisions The sole goal of the Historic Preservation Element (Historic) is: "To preserve Bradenton's architectural heritage as part of the effort to redevelop the old portions of the City." Historic Objective 1 is: "Disseminate information on the historic-architectural resources of the community and of the incentives for preservation and restoration of these resources." Historic Objective 2 is: "Restoration of historic structures and sites." Historic Objective 3 is: "Encourage other governmental agencies to consider historic and architectural value when taking actions affecting such properties in Bradenton and to modify their actions as to enhance rather than detract from these resources." Historic Policies include the dissemination of information pertinent to historic preservation, allowance of exemptions from the building code for certain historic rehabilitation, and cooperation with other governmental agencies in historic preservation efforts. Miscellaneous Provisions Plan Provisions Regarding Level of Service Standard for Recreational Facilities Recreation Element (Recreation) Objective 3 is: Provision of neighborhood parks located within walking distance of population served and having adequate acreage and facilities to serve the size and type of population served. Recreation Policies under Objective 3 include: Policy 1: One acre of neighborhood park per 500 people shall be the level of service standard for recreation. Policy 2: A neighborhood park shall be defined as a parcel of land of a half-acre or more located within a half-mile of the population served and having the following minimum improvements: benches, trees, open or grassy areas and play or exercise equipment facilities geared to the type of population served. Policy 3: Land use and development regulations adopted pursuant to this plan will require new residential development to provide recreation areas which meet the needs of that development based upon the adopted level of service standard for neighborhood parks. Such recreations shall serve in lieu of public neighborhood parks for new development. Plan Provisions Regarding Scheduling of Capital Improvements Necessary to Attain Level of Service D for Roads There are no roads identified in the Traffic Circulation Element (Traffic) for which Bradenton has jurisdiction that are projected not to achieve a level of service of D or better. The Data and Analysis states that seven road segments in Bradenton will attain a level of service standard worse than D during the planning timeframe. Plan, pages 125-27. However, the Data and Analysis indicates that the federal, state, or county has jurisdiction over each of these segments. Plan, page 114. Ultimate Findings of Fact Designation of Coastal High Hazard Area Petitioner has failed to prove to the exclusion of fair debate that the designation of the Coastal High Hazard Area is inconsistent with the criterion of supporting data and analysis. The Data and Analysis fails to indicate whether the Coastal High Hazard Area encompasses at least the V-zone or the land seaward of the Coastal Construction Control Line. However, Petitioner has failed to prove that the Coastal High Hazard Area excludes any part of the V-zone or the land seaward of the Coastal Construction Control Line. Testimony suggests that the Coastal High Hazard Area includes at least the V-zone. Petitioner has failed to prove to the exclusion of fair debate that the designation of the Coastal High Hazard Area is inconsistent with the criterion of the use of available appropriate data concerning historic damage and scientifically predicted damage of moving or storm driven water. The record contains no substantial evidence as to qualifying damage or destruction to areas outside the V-zone or landward of the Coastal Construction Control Line. Petitioner has failed to prove that the designation of the Coastal High Hazard Area is inconsistent with Plan provisions to protect coastal resources, protect the public from natural disasters, and maintain and hurricane evacuation times. Likewise, Petitioner has failed to prove that the designation of the Coastal High Hazard Area is inconsistent with provisions of the State Plan concerning housing, public safety, water resources, natural systems and recreational lands, land use, and governmental efficiency. As noted above, Petitioner failed to prove that the designation of the Coastal High Hazard Area is unsupported by data and analysis. Without proof that the designation of the Coastal High Hazard Area is incorrect, Petitioner is unable to prove the inconsistencies identified in the preceding Paragraph. Designation of Ten Units Per Acre on Western Peninsula of Perico Island Petitioner has proved to the exclusion of fair debate that the designation of up 10 units per acre is inconsistent with the criterion of supporting data and analysis, including a land use suitability analysis. The density of ten units per acre is, to the exclusion of fair debate, excessive under the circumstances. The soils are very poorly drained. The land above the Coastal High Hazard Area is very low. Except for 100 feet of frontage along the road, the entire upland will be flooded with the spring tide, which occurs with some regularity if not annually, as well as by flooding associated with hurricanes and tropical storms, even if the water is not storm driven. In the absence of an entirely elevated community, the spring tide and other coastal flooding will render inaccessible any interior residences, as well as inundate interior public facilities, unless natural drainage features and the mangrove fringes of the western island are significantly altered. The low elevation and very poorly drained soils increase the difficulty of effective stormwater management. At the same time, stormwater management is more critical on the island, which is surrounded by Outstanding Florida Waters and, in the case of Palma Sola Bay, Class II waters. The Spoonbill Bay DRI Development Order, which also serves as data and analysis, does not support the designation of ten units per acre for the western peninsula of Perico Island. The Development Order does not expressly transfer development rights from the western to the eastern peninsula. However, the Development Order rejects a request to develop the western peninsula at a density approximately equal to that accorded the western peninsula by the Plan. The Development Order expressly bases the denial upon transportation considerations. In light of other evidence, including quoted portions of the Data and Analysis, the cited transportation considerations probably included concerns as to the impact of transportation, including attendant stormwater runoff, upon the island's natural resources. In any event, Bradenton chose merely to designate up to ten units per acre on the western peninsula without addressing the bases for its denial, 15 years earlier, of approval to develop any portion of the western peninsula. Petitioner has proved to the exclusion of fair debate that the designation of ten units per acre is inconsistent with Coastal Goal 5, Objective 1 under Goal 5, Objective 5 under Goal 5, and Policies 1 and 4 under Objective 5. Goal 5 is to use coastal areas so as to preserve natural systems and minimize storm and flood hazards, among other things. Objective 1 is to limit development severely in low lying coastal areas. Objective 5 under Goal 5 is to keep population and investment low in areas vulnerable to coastal flooding. Policy 1 under Objective 5 is to limit residential development to low density below the eight-foot contour. Policy 4 is to discourage the location of high density residential projects in high priority hurricane evacuation zones, of which Perico Island is one. The Plan provisions set forth in the preceding paragraph preclude the designation of ten units per acre on the western peninsula. It is irrelevant whether the Plan's density designation is gross, so as to include some combination of Coastal High Hazard Area, mangrove fringe, wetlands, lakes, and Indian mounds, or net, so as to exclude all of such nonbuildable features of the land and waterscape characterizing the western peninsula. Even ten units per net acre is inconsistent with and repugnant to each of the provisions described above. 15/ Petitioner has proved to the exclusion of fair debate that the designation of ten units per acre is inconsistent with FLUE Objective 1; FLUE Objective 4; and Housing Policy 1 under Objective 1. Petitioner has not proved to the exclusion of fair debate that the designation of ten units per acre is inconsistent with FLUE Objective 3 or FLUE Policy 6 under Objective 1, which incorporates into the operative provisions of the plan Recommendation 6 for Neighborhood 12.04. FLUE Objective 1 is to locate new development in a manner sensitive to natural resources and natural hazards. FLUE Objective 4 is to limit population in the first priority hurricane evacuation zones. Housing Policy 1 under Objective 1 is to designate residential tracts except where unsuitable due to inappropriate elevation or drainage or other safety hazard. The designation of ten units per acre, even on a net acreage basis, is inconsistent with FLUE Objective 1 because the new development is not located in a manner sensitive to natural hazards and natural resources. The density designation is also inconsistent with FLUE Objective 4 to limit population in the first priority hurricane evacuation zones. There is no difference whatsoever between the density accorded the western peninsula, which is in Hurricane Evacuation Zone A, and the density accorded large areas of Bradenton, especially just east of Palma Sola Bay, although the latter areas are excluded on the Evacuation Map from any priority evacuation zone. The density designation is also inconsistent with Housing Policy 1 under Objective 1 due to the low elevation and poor drainage associated with the western peninsula. Policy 6 under FLUE Objective 1 incorporates the Recommendations for Neighborhood 12.04, which covers Perico Island. Recommendation 6 is to deny applications to increase the density of development in the neighborhood. FLUE Objective 3 is to manage future development through the adoption and enforcement of regulations to promote the use of land in a manner sensitive to the public health and safety and to soils and topography. Based on the Spoonbill Bay DRI Development Order, the density for the western peninsula may be viewed as zero. No evidence suggests what density the western peninsula may have arguably been accorded by a former comprehensive plan or zoning. However, it is possible to read Recommendation 6 as intending to incorporate the density given the western peninsula by the Plan, so Petitioner has not proved to the exclusion of fair debate that the density designation is inconsistent with Recommendation 6. Petitioner has failed to prove that the density designation is inconsistent with FLUE Objective 3 because of the latter's ineffectiveness. FLUE Objective 3 defers meaningful action to land development regulations and provides no upon real objective upon which an inconsistency determination could be based. Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criterion of an objective to coordinate coastal densities with the local hurricane evacuation plan. FLUE Objective 4 and Policy 1 under Objective 4 address this criterion. Petitioner has proved to the exclusion of fair debate that the Plan does not coordinate with the Spoonbill Bay DRI Development Order. As noted above, the density designation is consistent with Recommendation 6 of Neighborhood 12.04 only because it is assumed that the increased densities prohibited by Recommendation 6 are measured from the point of view of a former plan or former zoning, rather than the zero density accorded the western peninsula by the Development Order. In such a case, Recommendation 6 fails to coordinate with the Development Order. As noted above, the Data and Analysis fails to discuss why the Plan designates ten units per acre for the western peninsula when the Development Order prohibited any development. In effect, the Plan ignores the Development Order, and the resulting inconsistency is material in light of the impact of such a high density upon the natural resources of the peninsula and the public safety of future residents. However, the preceding two paragraphs are relevant only to consideration of the issue whether the density designation is supported by data and analysis. For reasons set forth in Conclusions of Law Paragraph 55, Rule 9J-5.006(3)(b)6., on which Petitioner relies, does not require an objective to coordinate with an DRI. Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criteria of a policy to protect environmentally sensitive land and an objective to protect, conserve, or enhance remaining coastal wetlands, living marine resources, coastal barriers, and wildlife habitat. These criteria are addressed by Coastal Goals 2, 4, and 5 and their objectives, as well as PFE Goal 4, which is to "[p]revent. . . flood damage and improve. . . surface water quality." Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criterion of an objective to direct population concentrations away from accurately defined coastal high hazard areas. For the reasons noted above, Petitioner has failed to prove that the Plan inaccurately defines the Coastal High Hazard Area for Bradenton, In the absence of such evidence, the Recreational/Conservation designation effectively addresses this criterion. Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criteria of an objective to encourage land uses that are consistent with the community's character and future land use and a policy to provide for the compatibility of adjacent land uses. The FLUE Goal, FLUE Objective 1, and Housing Policy 1 under Objective 1 address these criteria. Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criterion of an objective to maintain or reduce hurricane evacuation times between the barrier island and mainland. Coastal Goal 6 and Objective 1 address this criterion, as do FLUE Objective 4 and Coastal Goals 1 and 6, although less directly. Petitioner has proved to the exclusion of fair debate that the Plan is inconsistent with the provisions of the State Plan, construed as a whole. The density designation given the western peninsula of Perico Island conflicts with various provisions of the State Plan designed to protect water, coastal and marine resources, and to promote efficient land uses compatible with land and water resources. Stormwater Provisions Petitioner has proved to the exclusion of fair debate that the stormwater provisions of the Plan are internally inconsistent with Plan provisions concerning water quality protection and improvement. Coastal Goals 2 and 5 protect water quality. Goal 2 is to improve surface water quality. Objective 2 under Goal 2 is to reduce pollutant loads reaching waterways from urban stormwater. Goal 5 is to use coastal areas so as to preserve natural systems. The stormwater provisions are inconsistent with the above-cited provisions protecting water quality because the level of service standard contains a serious loophole. PFE Goal 4, Objective 1, Policy 2 completely undermines the drainage level of service standard by providing that its applicability to "various types and sizes of private development" shall be as set forth in land development regulations adopted by December 1, 1989. For the reasons set forth in Footnote 15 above, relegating to land development regulations substantial provisions required by law to included in a plan is ineffective for reasons involving public participation and notice, compliance review, and enforceability. In effect, the applicability of the drainage level of service standard is subject to land development regulations. The evidence is insufficient to prove to the exclusion of fair debate the inefficacy of the stormwater provisions based on stormwater projects included in the Capital Improvements Schedule. The Data and Analysis discloses that Wares Creek has suffered most extensively from untreated stormwater runoff. However, Table 4 in the Capital Improvements Element discloses that most, if not all, of the scheduled stormwater projects will affect the Wares Creek drainage basin, as defined in the map of Storm Drainage Areas on page 208 of the Plan. 16/ For the reasons set forth in the preceding paragraph, Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criterion of including in the Capital Improvements Schedule projects necessary to achieve treatment of stormwater sufficient to meet relevant water quality standards. Petitioner has proved to the exclusion of fair debate that the Plan is inconsistent with the criterion of a policy demonstrating how the local government will coordinate with the SWIM Plan, especially as to the latter's requirement that all stormwater discharge comply with relevant water quality standards. The Plan's drainage level of service standard, which is seriously undermined in the manner set forth above, is further hampered by the failure of the standard to include post- development water quality standards. As noted in the SWIM Plan data and analysis, the water quality of stormwater runoff is a key factor in preserving the health of the Outstanding Florida Waters that surround Perico Island and in restoring the health of other nearby waters. Due to the failure of the Plan submitted into evidence to contain as an appendix the Comprehensive Stormwater Management Study, 1981, Petitioner has failed to prove to the exclusion of fair debate that the scheduled capital improvements concerning stormwater projects fail to implement the SWIM Plan. In addition, the SWIM Plan does not generally impose project deadlines for various capital improvements. Petitioner has proved to the exclusion of fair debate that the stormwater provisions of the Plan are inconsistent with the provisions of the State Plan, construed as a whole. The failure to incorporate into the Plan an effective level of service standard for post-development runoff rate for all developments and the failure to incorporate any level of service standard for post-development runoff water quality are inconsistent with the above-cited provisions of the State Plan. Historic Provisions Petitioner has failed to prove to the exclusion of fair debate that the Historic Element is inconsistent with the criterion of supporting data and analysis; the Historic goal is internally inconsistent with the Historic objectives and policies; or the Historic provisions are inconsistent with the criteria that objectives be measurable and policies describe how programs and activities will achieve the goals. None of the Historic provisions contradicts any of the Data and Analysis concerning historic resources. The Historic objectives and policies are in no way inconsistent with the Historic goal of preservation. The Historic objectives are measurable, and the policies describe how programs and activities will achieve the goals. Miscellaneous Provisions Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criterion of establishing a level of service standard for recreational facilities. Recreation Objective 3 and Policy 1 establish a level of service standard for recreation by acreage. Policy 2 addresses the facilities that must be constructed for each park used to satisfy the recreational level of service standard. Petitioner has failed to prove to the exclusion of fair debate that the Plan is inconsistent with the criterion of including in the Schedule of Capital Improvements projects necessary to achieve a level of service D for roads. No roads for which Bradenton is fiscally responsible are predicted to attain a level of service standard more congested than D during the planning timeframe.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Community Affairs submit the Recommended Order to the Administration Commission for entry of a final order determining that Bradenton's plan is not in compliance for the reasons set forth above. ENTERED this 13th day of February, 1992, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 1992.

Florida Laws (14) 120.57163.3161163.3167163.3171163.3177163.3178163.3184163.3191163.3202163.3213163.3215187.201373.451380.045 Florida Administrative Code (7) 9J-5.0019J-5.0029J-5.0039J-5.0059J-5.00559J-5.0069J-5.012
# 2
KELLY CADILLAC, INC., AND HUDSON CONSTRUCTION COMPANY vs RESORT HOSPITALITY ENTERPRISES, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-000342 (1997)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 22, 1997 Number: 97-000342 Latest Update: Jul. 02, 1998

The Issue The issues to be resolved in this proceeding concern whether the Department of Environmental Protection (DEP) has jurisdiction over the activities encompassed by Permit Application BA-475 (Amended) and, if so, whether issuance of the permit complies with the applicable provisions of Section 161.053, Florida Statutes, and Chapter 62B-33, Florida Administrative Code.

Findings Of Fact Undisputed Facts: The following relevant facts are established by stipulation or admission and are not disputed. The proposed project is landward of the seasonal high waterline within thirty (30) years of December 1996; The project will not interfere with public access; The project will not result in the net excavation of in situ sandy soils seaward of the coastal construction control line (CCCL); Any sandy soil or material excavated for the proposed project seaward of the control line will remain seaward of the control line or setback and be placed in the immediate area of construction; The proposed project complies with the structural provisions of Rule 62B-33.007(2), Florida Administrative Code; The proposed project complies with Rules 62B-33.007(3)(a) through (d) and (f) through (h), Florida Administrative Code. Additionally at hearing, the Petitioners and Intervenor announced that they would not present any evidence on the issue of adverse impacts on marine turtles. Accordingly, impacts on marine turtles are not at issue in this proceeding. Project Description: RHE has proposed constructing a restaurant, pool, deck and stormwater basin within the Boardwalk Beach Resort on Panama City Beach, in Bay County, Florida. The Boardwalk Beach Resort consists of four (4) multi-story hotels with six hundred (600) rooms all together, several pools, boardwalks extending the length of the property and approximately seventeen hundred (1,700) to eighteen hundred (1,800) feet of beach front property. The project site is between Thomas Drive to the north and the Gulf of Mexico to the south. On July 23, 1996, RHE applied to the Department for a CCCL permit to construct, seaward of the interim line established by the emergency Order of October 16, 1995, the restaurant, swimming pool and deck. Part of the proposed deck was located seaward of the coastal construction setback line. On December 9, 1996, the Department issued a permit to RHE to construct the restaurant building with an attached deck fifteen (15) feet landward of the location originally proposed by RHE, as well as for construction of the swimming pool. On December 16, 1996, the Department issued to RHE an Amended CCCL permit authorizing construction of a restaurant building located five (5) feet landward of the location originally proposed by RHE, as well as a deck re-designed so that it would be structurally independent of the restaurant, a swimming pool and a dune enhancement plan which would restore the sandy dune seaward of the pool and restaurant location to its pre-hurricane Opal condition and elevation. The Amended permit would require re-vegetation of the dunes at the site with native plants to secure the dunes from erosion. Both the original and the Amended permits authorized the removal of the stormwater drainage pipe that carried stormwater onto the beach that had caused erosion of the beach near the project area. On January 9, 1997, the Petitioners timely filed a Petition challenging the Department’s decision to issue the Amended permit. On February 7, 1997, the Department established a new CCCL line for Bay County that was farther landward than either the old coastal construction setback line or the interim line established in the October 1995 emergency order. The project authorized by the Amended permit would thus be located entirely seaward of the newly established CCCL for Bay County. As of February 7, 1997, the date the new line was established, RHE had not begun working on the foundation or continued construction above the foundation for any of the structures authorized by the Amended permit. The Department determined that the project did not meet the requirements of Section 161.053(9), and Rule 62B-33.004(1), Florida Administrative Code, so as to qualify for an exemption from complying with the newly established CCCL for Bay County, as the project was not “under construction” at the time the new CCCL was established. The beach and dunes system is wide and the dune system is a significant one, with elevations of fourteen (14) to sixteen (16) feet NGVD, with a wide dune crest. The dry sandy beach in front of the site, even after hurricane Opal struck, remained approximately one hundred twenty-five (125) feet wide. From 1855 to 1934 the shoreline of the site was mildly accretional. Thereafter, until 1955 accretion was less significant, but from 1955 to 1976 became significant. From February 1992 through April 1995, the project site experienced a period of mild erosion. Accordingly the long-term data shows, in essence, that the shoreline is relatively stable at the site. Hurricane Opal caused the dune to erode or retreat landward by approximately a distance of fifteen (15) feet. Hurricane Opal was a major magnitude storm with one hundred twenty-five (125) mile per hour sustained winds and one hundred forty-four (144) mile per hour measured gusts when it came ashore in the vicinity of the proposed site. The dune portion of the proposed site now essentially mimics the pre-Opal conditions. Following hurricane Opal the applicants spent approximately Four Hundred Thousand Dollars ($400,000.00) in dune restoration along the entire shoreline of the resort property, some seventeen hundred (1,700) to eighteen hundred (1,800) feet of shoreline. That dune restoration work was permitted by the Department. There is now little native salt-tolerant vegetation on the site in its natural pre-construction condition. An existing stormwater drainage pipe and catch basin extend onto the beach seaward of the location of the proposed restaurant. The existing pipe and basin have caused erosion of the beach and the sand dune system on the project site. Under the amended permit proposal the stormwater pipe and basin would be removed. All of the proposed structures authorized by the Amended permit would be landward of the pre-Opal coastal construction control line. The proposed pool will be located landward of the dune crest and fifty-five (55) feet landward of the toe of the dune. The proposed restaurant would also be located landward of the dune crest and two hundred five (205) feet landward of the mean high waterline. The original design of the project was for a much larger, three story restaurant. The original pool design called for a one hundred twenty foot pool extending from in front of the Comfort Inn to beneath the proposed restaurant, in effect being located on the first floor of the restaurant. At DEP’s request the size of the pool was reduced by fifty percent (50%) and it was relocated into the shadow of the Comfort Inn next door so that it will no longer serve as an integral part of the restaurant. Pool depths were also reduced to three (3) feet at DEP’s request. The pool, at DEP’s request, will now be constructed of Gunnite concrete material and will be frangible, that is, it will be designed to break up in storm-surge or storm-waves. This will serve to decrease the erosion which could be caused by storm-waves flowing over and around the pool structure. The same is true of the restaurant deck, which at DEP’s request has been re-designed to be separate from the restaurant and also designed to fail in storm conditions. The frangibility of the deck, as now proposed, will retard erosion during storm conditions, as the stormwater or waves will demolish the deck and remove it rather than scouring the sand dune around it. The Department also requested that the existing stormwater drain pipe and catch basin be removed and such a removal has been made a condition of the subject permit. This will require that the applicant design and build a new stormwater system. The applicant has agreed to this condition and the others referenced above. Vegetation: Construction of the proposed project will not result in the removal or destruction of native vegetation. There is no such vegetation on the site where the construction will take place. Thus, construction of the project will not result in removal or destruction of native vegetation which will either cause de-stabilization of a "frontal, primary or significant dune" or cause a significant adverse impact to the beach and dune system due to increased erosion by wind or water. A special condition of the proposed amended permit requires that the applicant submit a dune enhancement plan for restoration of the dunes seaward of the pool and restaurant to its pre-hurricane Opal condition, including re-vegetation. Such a plan was submitted by the applicant and it includes the planting of sea oats on one (1) foot centers. The planting of sea oats as part of the dune enhancement plan will constitute a significant improvement to the native vegetation situation at the site. Disturbance of Sandy Soils: The project will not result in the removal or disturbance of in situ sandy soils of the beach and dunes system to such a degree as to have an adverse impact on the system. That is, the existing ability of the system to resist erosion during a storm will not be reduced. The proposed project will not result in the removal or disturbance of in situ sandy soils of the beach and dune system to such a degree as to cause adverse impact to those systems by lowering existing levels of storm protection to upland properties and structures. All the sandy material excavated for the pool and the stormwater basin will be placed seaward of these structures on the dune in the immediate area of the construction and seaward of the CCCL. The additional sand to be placed on the dune as part of the dune enhancement plan will, in fact, enhance the ability of the system to resist erosion during the storm. The ability of the dune to resist storm erosion is primarily a function of the quantity of sand within the dune system. The additional sand to be placed on the dune as part of the dune enhancement plan will enhance the protection of upland properties and structures including those of the Petitioners and Intervenor. Excavation of the stormwater basin will not destabilize the dune on the project site. The applicant is moving the stormwater basin landward by twenty (20) feet which will minimize the potential impacts of the basin on the dune system. The preponderant evidence establishes that the structure of the pool and pool deck will not cause an increase in structure-induced scour of such a magnitude as to measurably affect shoreline change rates. Scour caused by the pool will not significantly interfere with the beach-dune system's ability to recover from a coastal storm. The frangible design of the pool decreases the likelihood that it will cause any scour. It will break up in a storm so that any scour caused by the pool would be minimal. Any scour caused by the pool would not disturb the topography or vegetation such that the coastal system would become unstable or suffer catastrophic failure. Scour would have no measurable effect. The proposed restaurant and deck will not cause an increase in structure-induced scouring during a storm of such a magnitude as to have a significant adverse impact. The restaurant and deck will be constructed on piles. Scouring around piles, in a storm situation, is very localized and insignificant. By constructing the restaurant and deck on piles at the design elevation, storm-surge and storm-waves will pass under the deck and restaurant. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune to permit natural shoreline fluctuations. The structures will be built on pilings and will be elevated above the storm-surge; thus they will not interfere with shoreline fluctuations. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune so as to preserve and protect beach and dune system stability, in terms of the lack of interference with such. Other structures in the area are seaward of the proposed restaurant and deck, including Pineapple Willies Restaurant, located eleven hundred feet to the west. Those structures have not caused instability of the beach during hurricane Opal. Typically, existing structures do not cause instability of the dune systems. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune so as to allow for natural recovery to occur following storm-induced erosion. Natural recovery commonly occurs under pile-supported elevated structures which is not the case with “slab-on-grade” structures which are not elevated. The pool and pool deck will permit natural shoreline fluctuations, will preserve and protect beach and dune stability, and will allow recovery after a storm because they are designed as frangible structures that will fail and disintegrate in a storm situation. Thus they will not appreciably affect the beach-dune system. Line of Construction: Most coastal construction in Bay County extends out to the pre-Opal CCCL while some construction extends beyond it. Throughout Bay County the line of construction is the pre-Opal CCCL. The line of construction is determined by the most seaward extent of similar existing structures in the immediate area of the proposed structure under consideration in a CCCL permit application. The proposed pool is landward of the line of construction determined by existing pools within the boardwalk beach resort. There are a number of existing multi-story structures to the east of the proposed restaurant that are located out to the pre-Opal CCCL. That pattern of construction continues to the east of the proposed restaurant. Approximately one thousand (1,000) feet to the east of the proposed restaurant is an existing multi-story major structure that is built out to the pre-Opal CCCL. The beach in the area of the project is highly developed with commercial and condominium buildings. Within eleven hundred to twelve hundred feet to the west of the proposed restaurant there is another major structure built out to the pre-Opal CCCL. Just beyond that structure are a number of additional major structures, including Pineapple Willie's Restaurant, that are constructed out to the pre-Opal CCCL. The multi-story major structures to the east and west of the proposed structure are within the immediate area of the restaurant. The proposed restaurant is located landward of the line of construction established by these major structures within its immediate area. That line of construction is the pre-Opal CCCL. DEP did not consider major structures more than one thousand (1,000) feet from the proposed restaurant when it determined the line of construction for the restaurant. It is DEP’s policy when reviewing CCCL applications not to consider structures more than one thousand (1,000) feet from a proposed structure when determining the line of construction. The one thousand (1,000) foot limit DEP uses to determine the line of construction is not embodied in a rule. There was no preponderant coastal engineering or other scientific evidence which justifies the one thousand (1,000) foot limit DEP imposes when it determines the line of construction. It was appropriate to consider the existing structures referenced above in assessing the line of construction for this amended permit application and considering those lying just beyond the one thousand (1,000) foot distance, because those existing structures dominate the coastal processees in the region and only lie just beyond one thousand (1,000) feet to the east and twelve hundred (1,200) feet to the west. If the Department had considered the above-referenced existing major structures just beyond one thousand (1,000) feet of the proposed restaurant, it would have been shown that the proposed project was landward of the thus established line of construction. No preponderant evidence was offered to explicate why the one thousand (1,000) foot limit was automatically adhered to in this situation. Moreover, the line of construction is not a prohibition in and of itself but rather is only one of several criteria that must be balanced in determining whether or not to approve a CCCL permit application. Projects have been approved seaward of the line of construction in the past. Minimization The location of the swimming pool at the most practicable landward location, the reduced size of the pool, as well as its frangible design and limited depth, has minimized its impact. The placing of the excavated material in the pool’s immediate area and the restoration of the dune in front of the pool and deck have minimized the impacts of the pool and deck. The construction of the restaurant on pilings with its design elevation above storm-surge and storm-wave elevations, together with locating it behind the dune crest and away from the active beach, has minimized the impact of the restaurant. The deck is on pilings as well, elevated above storm-surge and storm-wave levels. It will be physically separate from the restaurant and its design frangibility (so that it will fail in a storm) results in its impact being minimized. The stormwater basin is located as far landward as practicable. Its location and the placing of the materials excavated for the basin on the dune immediately adjacent to the basin has minimized the impact of the proposed stormwater basin on the beach-dune system. The restaurant, pool, deck, and stormwater system will not have a significant adverse impact to the beach-dune system. The restaurant will not adversely affect exiting shoreline change rates, will not significantly interfere with recovery following a storm, and will not disturb topography or vegetation such that the system will become unstable or suffer catastrophic failure. Cumulative Impacts The proposed project will not have an unacceptable cumulative impact. There are no other proposed similar projects to take into account and a cumulative impact assessment has shown there to be no adverse cumulative impact. No evidence was offered to show that an unacceptable adverse cumulative impact in terms of existing or other proposed projects will result. Positive Benefit The proposed project will have a net positive benefit on the beach-dune system. The removal of the slab-on-grade constructed building will have a beneficial impact because it will reduce the chance of storm erosion to the beach-dune system posed by such structures. The existing stormwater pipe and catch basin which cause erosion would be removed, resolving that erosion problem. Stormwater will now be retained in a new stormwater basin designed to serve 1.7 acres and it will not flow onto the beach for any rainfall event up to a one hundred year design storm. The new stormwater system is designed to recover quickly after a storm event and to treat stormwater. The removal of the stormwater pipe and catch basin, and the installation of the new stormwater basin will have a positive benefit to the beach-dune system. The new stormwater system complies with Special Permit Condition 7. Moreover the applicant will restore the dune seaward of the project to its pre-hurricane Opal condition and will plant sea oats, on one foot centers, throughout the restoration area in accordance with Special Permit Condition 1.8. Such restoration of the dune and vegetation will benefit the beach-dune system. The natural recovery process will take several decades without the placement of sand in the dune restoration project. The dune enhancement plan submitted by the applicant, in order to comply with Special Permit Condition 1.8, exceeds the requirements of that condition since it places more sand on the dunes than necessary to achieve pre-Opal conditions. Testimony of expert witness Michael Walhter, which is accepted, establishes that restored beaches and dunes function much like natural ones in storm events even though they can be somewhat inferior in resistance to storm-surge and waves since the sand is not as compacted at first. This dune enhancement plan, however, exceeds the permit requirements by placing more sand than necessary on the dunes to achieve pre-Opal conditions. The Interim CCCL On October 16, 1995, the DEP issued its emergency Order establishing an interim CCCL for Bay County one hundred feet landward of the pre-Opal CCCL. The Department established that interim line in order to regulate coastal development in the wake of Hurricane Opal. In 1978 the Legislature established criteria to be used by DEP in establishing or re-establishing all CCCL’s. They are thus to be established to define that portion of a beach-dune system subject to severe fluctuations from a one hundred year storm event. At the time of Hurricane Opal, DEP had not re-established the Bay County CCCL using a one hundred year storm event criterion. The interim CCCL for Bay County established by the above-referenced emergency Order did not utilize nor was it based on the statutory one hundred year storm event criterion. All twenty-three (23) other CCCL’s that have been established based on the statutory one hundred year storm event criterion were established by rule. As of January 15, 1997, the applicant had received all governmental approvals necessary to begin construction of the proposed project except for that which is the subject of this proceeding. On January 22, 1997, DEP by letter advised the applicant to cease and desist construction of the project. On February 7, 1997, the Department by rule then taking effect established a new CCCL.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, and the candor and demeanor of the witnesses, it is, therefore, DETERMINED: That the Department of Environmental Protection has jurisdiction over the proposed project and that it is, therefore, recommended that a Final Order be entered granting the Respondent, Resort Hospitality’s CCCL application consistent with the terms and conditions espoused by the Final Order of December 17, 1997, Respondent’s Exhibit 2 and the project plans depicted in Respondent’s Exhibits 3 and 4. DONE AND ENTERED this 30th day of January, 1998, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January, 1998. COPIES FURNISHED: Bram D. Canter, Esquire 103 North Meridian Street Tallahassee, Florida 32301 Thomas I. Mayton, Jr., Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Thomas G. Tomasello, Esquire 1315 East Lafayette Street, Suite B Tallahassee, Florida 32301 Neil H. Butler, Esquire Butler and Long, P.A. Post Office Box 839 Tallahassee, Florida 32302-0839 Kathy Carter, Agency Clerk Office of General Counsel 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 F. Perry Odom, Esquire Office of General Counsel 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (5) 120.54120.57120.68161.021161.053 Florida Administrative Code (6) 62B-26.02462B-33.00262B-33.00462B-33.00562B-33.00762B-33.008
# 4
EDWARD S. COLEY AND JUANITA G. COLEY vs. DEPARTMENT OF NATURAL RESOURCES, 84-000508 (1984)
Division of Administrative Hearings, Florida Number: 84-000508 Latest Update: Dec. 07, 1984

The Issue Whether Petitioners' application for a permit to construct a dwelling in Walton County, Florida, should be approved, pursuant to Chapter 161, Florida Statutes. In January of 1984, Respondent Department of Natural Resources provisionally denied Petitioners' application for a permit pursuant to Chapter 161, Florida Statutes, to construct a dwelling on their property in Walton County seaward of the existing coastal construction control line. Petitioners requested a hearing pursuant to Section 120.57(1), alleging that the denial of their application was unlawful on constitutional grounds and that it exceeded Respondent's discretionary powers under Chapter 161. The request for hearing was referred by Respondent to the Division of Administrative Hearings, Case No. 84-0508. Thereafter, Respondent's motion to strike those aspects of the petition alleging the unconstitutionality of the proposed denial was denied on the basis that Petitioners properly may preserve such matters for any appellate review. Thereafter, Petitioners sought to amend their petition to allege the invalidity of certain of Respondent's rules and, although such petition was granted, Petitioners were informed that any administrative determination of the invalidity of rules must be made the subject of a separate petition filed with the Director of the Division of Administrative Hearings. On June 11, 1984, Petitioners filed a petition with the Division challenging the validity of certain of Respondent's rules which were cited by Respondent as the basis for the proposed denial of Petitioners' application for a permit. The petition alleged that said rules were not appropriate to the ends specified in Section 161.053, Florida Statutes, that the effect of the rules was to establish a class of property owners who could be excluded from receiving permits to construct dwellings seaward of the coastal construction control line merely because their lots or parcels of land are larger than their neighbors or other adjacent owners, and that such rules are arbitrary and capricious as they relate to the petitioners because other property owners in Walton County had been permitted by Respondent to construct dwellings similar to hat proposed by the Petitioners beyond the coastal construction control line. DOAH Case No. 84-0508 and the case involving the rule challenge, DOAH Case No. 84-2053R, were consolidated for purposes of hearing. At the hearing, Petitioners presented the testimony of Brett Moore, a coastal engineer employed by the DNR Division of Beaches and Shores, Dennis Evans, an architect, and Petitioner Edward S. Coley. Petitioner submitted ten exhibits in evidence Respondent presented the testimony of Brett Moore, Deborah Flack, Director of the Division of Beaches and Shores, and Ralph Clark, Chief of the Bureau of Coastal Engineering and Regulation. Respondent submitted 21 exhibits in evidence. Posthearing submissions submitted by the parties in the form of Proposed Recommended Orders have been fully considered and those portions thereof not adopted herein are considered to be either unnecessary, irrelevant, or unsupported in law or fact.

Findings Of Fact In 1981 Petitioners Edward S. Coley and his wife, Juanita P. Coley, purchased lot 8, block A, Camp Creek Lake Subdivision, in Walton County, Florida. The lot is located on the beach at the Gulf of Mexico in a platted subdivision. Petitioners purchased the property for the purpose of building a beach house that would eventually be a retirement home. (Testimony of E. Coley, Petitioners' Exhibit 1, Respondent's Exhibit 1). At the time Petitioners purchased the lot, there were a number of existing dwellings to the east of the lot and several to the west. The habitable portions of these dwellings for the most part were located at or near the existing coastal construction setback line that had been established by Respondent in 1975 to provide protection to the dune area of the beach. Although Petitioners planned to locate their two-story dwelling approximately on the then-existing setback line, they had not done so at the time a new coastal construction control line was established in December 1982, which resulted in moving the setback line further landward for a distance of some sixty two feet. The county coastal construction control lines are established under the authority of Section 161.053, Florida Statutes, and are intended to define the portion of the beach-dune system which is subject to severe fluctuations based on a 100-year storm surge. Construction seaward of the line is prohibited unless a permit is obtained from Respondent. (Testimony of E. Coley, Moore, Clark, Petitioners' Exhibit 1, 5, Respondent's Exhibit 1, 20). On September 19, 1983, Petitioners filed an application with Respondent to construct a 2000 square foot two-story house on their lot. The dwelling was designed to have upper and lower decks facing the Gulf, with a dune walkover structure seaward, and a three-car garage attached to the main house by a breezeway. As planned, the seaward extent of the habitable portion of the house would be located some eight feet landward of the old setback line and approximately 62 feet seaward of the existing construction control line. After processing the application, Respondent's Chief of the Bureau of Coastal Engineering and Regulation advised Petitioners by letter dated January 5, 1984, that a staff recommendation to deny the application would be presented to the head of the Department, consisting of the Governor and Cabinet, on January 17, 1984, and advising Petitioners of their rights to a Chapter 120 hearing. By letter of January 11, 1984, Petitioners did request a hearing pursuant to Section 120.57, F.S., and, on January 17, Mr. Coley appeared before the Governor and Cabinet to support approval of his application. On March 20, 1984, the Governor and Cabinet approved the minutes of its January 17th meeting wherein the apparent basis for the proposed denial of Petitioners' application was stated as follows: The staff is concerned that the applicant is not effectively utilizing the property landward of the control line and that the proposed encroachment is unnecessary and not justified. Prior to the preparation of the structural plans, the staff recommended a 25 foot landward relocation of the structure in order to more effectively utilize the property landward of the control line and provide an effective, protective setback from the active dune area. Presently, there exists approximately 85 feet between the landwardmost portion of the proposed garage structure and the landward property line. The recommended 25 foot landward location represents a compromise that acknowledges the line of existing construction in the immediate area. . . . * * * Dr. Gissendanner stated that this was the first building permitted in this area. All the other buildings there had been built before a permit was required. Now it was necessary to take into consideration the new coastal construction line and the accumulative effect which the new law imposed. The problem was that the Department did not want to start a precedent to allow the house to be built out there and have other people come in and want to build along the same line. By letter of September 29, 1983, Respondent had advised Petitioners that any structure of the size proposed by Petitioners located within the dune region would adversely impact and limit the extent of dune recovery following severe erosion associated with a major storm event. The letter proposed a compromise in location of Petitioners' dwelling to a point approximately 25 feet landward of the desired location, thus placing the seawardmost portion of the habitable structure approximately 35 feet seaward of the construction control line. This was stated to be a viable compromise since there existed sufficient room to locate the entire structure, including garage, landward of the control line. Petitioners however declined to accept such a compromise in the belief that to do so would eliminate any view of the Gulf over the dune line except from the upstairs deck of the proposed structure. (Testimony of E. Coley, Moore, Clark, Petitioners' Exhibits 1-2, 9, Respondent's Exhibits 1-8, 13-16). The height of the dune line on Petitioners' lot is approximately 27 feet high, which is the same elevation as the first floor of the proposed dwelling at the desired site. The proposed second floor would be 9 feet above the crest of the dune. However, if placement of the structure was moved landward 25 feet, it would be impossible to see over the dune area from the ground floor of the house. Additionally, the view of the beach area would be obstructed by the homes to the east and west of Petitioners' lot. The proposed dwelling is designed for the maximum allowable height of 30 feet. Under dead covenants and restrictions, a variance would have to be obtained to build a taller structure. The value of Petitioners' property would undoubtedly be diminished to come extent if the house was built substantially behind the adjacent dwellings because of the restricted view of the beach and water area. (Testimony of E. Coley, Evans, Petitioners' Exhibits 1, 8). Although there would be no adverse impact on adjacent properties if Petitioners were permitted to build in the desired location, such proposed siting could have an adverse impact on the dune system as a result of a major storm event since the dwelling would be located on the seaward edge of existing vegetation at the landward toe of the dune. If the location were to be moved 25 feet further landward, there would be additional vegetation to facilitate recovery of the system after such a storm. Respondent's Chief of the Bureau of Coastal Engineering and Regulation also believes that the existing structures in that area would be demolished as a result of a major storm, but Petitioners' house, which is designed to withstand a 100-year storm event, would remain, thus impeding full recovery of the dune system. (Testimony of Moore, Flack, Clark, Respondent's Exhibits 9-12, 19, 21). Respondent has permitted several structures in the past which were located seaward of the coastal construction control line, but these were approved because the impact on the dune system was minimized in those locations, and also because the applicants had utilized all of the upland property possible on their lots. (Testimony of E. Coley, Moore, Clark, Petitioners' Exhibits 3-4, 6-7, 9-10). Although conflicting evidence was received as to whether or not the existing structures east of petitioners' lot constitute a "reasonably continuous and uniform construction line," it is found that although minor variations exist in the location of individual dwellings, they do meet the quoted statutory standard set forth in Section 161.053(4)(b), Florida Statutes. The existing structures have not been affected by erosion. (Testimony of E. Coley, Evans, Moore, Flack, Clark, Petitioners' Exhibit 1). Petitioners' structural design meets Respondent's technical requirements subject to standard conditions of the Department. (Testimony of Moore, Evans, Flack, Petitioners' Exhibit 2). The Departmental rules cited by Respondent as the authority for the proposed denial of Petitioners' application are Rules 16B-33.05(1), (2), (6), 33.06(2), and 33.07(2), Florida Administrative Code. (Petitioners' Exhibit 4).

Florida Laws (2) 120.57161.053
# 5
DEPARTMENT OF COMMUNITY AFFAIRS vs JOHN E. SCOTT, ALICE J. SCOTT, HUGH E. RHODUS, AND MONROE COUNTY, 93-004565DRI (1993)
Division of Administrative Hearings, Florida Filed:Homestead, Florida Aug. 17, 1993 Number: 93-004565DRI Latest Update: Dec. 14, 1994

The Issue At issue in this proceeding is whether a development order (building permit) issued by Monroe County to John and Alice Scott, Owners, and Hugh E. Rhodus, General Contractor, for the construction of a vertical seawall/dock on Lots 31 and 32, White Marlin Beach subdivision, Matecumbe Key, Monroe County, Florida, is consistent with the Monroe County Comprehensive Plan and land development regulations.

Findings Of Fact The Property Respondents John and Alice Scott are the owners of two canal front lots known as Lots 31 and 32, White Marlin Beach subdivision, Matecumbe Key, Monroe County, Florida. Lots 31 and 32 were acquired in 1968 and 1970 and are undeveloped. The subject lots are in incorporated Monroe County, Florida, and are zoned Improved Subdivision (IS). The Scotts reside on a third lot facing the bay that is across the street from the subject lots. Respondents' lots are within the Florida Keys Area of Critical State Concern. The land where the White Marlin Beach subdivision is located was at one time all mangroves and other trees. The subdivision was created in 1955-56 by means of dredge and fill activities. During the late 1960s and early 1970s, the shorelines of Lots 31 and 32 were even with an existing bulkhead on an adjacent lot. Very small mangroves were beginning to revegetate the shorelines. By 1979-1980, some shoreline erosion had occurred on the lots, estimated at 5-6 feet. At some unknown time thereafter, additional shoreline erosion occurred, estimated at its greatest point to be approximately 10 feet from the original platted fill line. At the time the permit application was considered and at the time of the hearing, the revegetated mangroves had grown into a substantial fringe of high complexity, running the entire 117-foot length of the two lots and varying from 5 to 15 feet in width. Some of the trees are as tall as 12 feet. The area in which the mangroves have revegetated slopes gently toward the canal. It constitutes a shallow water habitat which, in addition to the mangrove vegetation, supports crabs, juvenile fish, algae, and seagrasses. The expert witnesses of both Petitioner and Respondent testified that the mature mangrove fringe on the two lots has stabilized the land area adjacent to the canal. Landward of the mangrove fringe, the lots are comprised of unconsolidated sand used to create the lots. The edges of the fill material form a gentle slope from as low as six inches up to 24 inches at one extreme. Upland erosion is occurring along the edge of the unconsolidated fill, washing down the slope of the fill into the mangroves. Erosion of the edges of upland fill is a common occurrence in the Florida Keys. 10 The unconsolidated fill material where the erosion is occurring constitutes the uplands portion of the lots and is caused by weather events (wind and rain), rather than by tidal or wave action. There is active boating traffic on the subject canal; many large commercial and pleasure boats use the canal. Marine fuel and supplies are sold at Angelo's. There is a commercial fishing "village" located at and around Angelo's. To reach open water, i.e., the Gulf bay, boats must pass lots 31 and 32 after leaving Angelo's. Most of the other lots on the same canal as lots 31 and 32 are primarily protected by seawalls. The Scotts, under the subject seawall permit, are seeking to tie in to the adjoining seawall for consistency in community character and appearance. The adjoining property owners and many of the neighboring property owners want the mangroves removed and a seawall built to protect lots 31 and 32. Permit Application and Issuance On March 11, 1992, the Scotts applied to Monroe County for a permit to construct a seawall on Lots 31 and 32, White Marlin Beach subdivision. The Scotts' seawall permit application was denied by Pat McNeese, the Monroe County Environmental Resources Director, based upon her conclusion that erosion was not occurring on the lots and thus a seawall was not allowed under the Monroe County land development regulations. The Scotts appealed Ms. McNeese's decision to the Monroe County Planning Commission. As part of their evidence, Respondents offered a certified land survey conducted on November 1, 1992, which shows that the approximate shoreline of the property is at its greatest point roughly 10 feet landward of the platted shoreline. After hearing, the Planning Commission upheld Ms. McNeese's decision to deny the permit. The Scotts then appealed the Planning Commission's decision to the Monroe County Board of County Commissioners. The Board overturned the Planning Commission. The Board found that the Scotts are entitled to a permit to develop a seawall for erosion control under the provisions of Section 9.5-345(m)(2)(b), Monroe County Code. On April 19, 1993, Monroe County issued building permit number 9230005939 which is the subject of this proceeding. The permit was rendered to the Department on April 21, 1994, and was appealed by the Department 45 days thereafter. Monroe County Comprehensive Plan and Land Development Regulations The Monroe County Comprehensive Plan contains various policies directed toward preservation or conservation of the Keys environment and maintenance of water quality. Section 2.104, Nearshore Waters, Monroe County Comprehensive Plan, Volume II, Future Land Use Element, states, in part, that: The Florida Keys are dependent on nearshore water quality for their environmental and economic integrity. The heart of the Florida Keys economy, the means by which Monroe County exists as a civil and social institution, is based on its unique, oceanic character. If nearshore water quality is not maintained, then quality of life and the economy of Monroe County will be directly and immediately impacted. OBJECTIVES 1. To protect, maintain and, where appropriate, improve the quality of nearshore waters in Monroe County. * * * POLICIES 1. To prohibit land uses that directly or indirectly degrade nearshore water quality. * * * To prohibit the development of water dependent facilities, including marinas, at locations that would involve significant degradation of the biological character of submerged lands. To limit the location of water-dependent facilities at locations that will not have a significant adverse impact on off-shore resources of particular importance. For the purposes of this policy, off-shore resources of particular importance shall mean hard coral bottoms, habitats of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet, and all designated Aquatic Preserves under Ch. 253.39 et seq. the [sic] Florida Statutes. The Monroe County Comprehensive Plan, Volume II, Sec. 2-115 entitled "Enforcement" provides: A major component of any future land use element is the need to strictly enforce implementing regulations. If Monroe County is to achieve the promise of this Plan, it is essential that all persons involved in the land development process adhere to the requirement of this Plan and that the integrity of the development review process be protected. The Monroe County Comprehensive Plan, Future Land Use Element, Volume II, Natural Vegetation Management Policies provides: In recognizing the need to preserve as much natural vegetation as possible, the County will direct its land use and development regulations to minimize destruction of natural vegetation and modification of landscape. Guidelines and performance standards designed to protect natural vegetation from development will be developed and enforced. Clearing of native vegetation for development will be controlled. * * * 3. Regulations controlling development in areas characterized primarily by wetland vegetative species such as mangrove and associated vegetation will emphasize preservation of natural vegetation to the maximum degree possible. * * * 8. The existing County ordinances designed to protect and conserve natural vegetation will be strictly interpreted, rigidly enforced, and/or amended when necessary. * * * Of all the natural landforms and features which must be given due consideration in their protection, protection of the shoreline is of prime concern. . . . Chapter VII, Coastal Zone Protection Element, Marine Resources Management Policies section, Future Land Use Element, Monroe County Comprehensive Plan, Volume II, states that: Recognizing the crucial role that the marine environment plays in the local economy, the protection, conservation, and management of marine resources will be viewed as an issue requiring the County's utmost attention. In an effort to protect and conserve marine resources, emphasis will be placed on protecting the entire marine eco-system. 1.2. To this end, maintenance of water quality; protection of marine flora and fauna, including shoreline vegetation; and preservation of coral reefs will be regarded as being absolutely essential to maintaining the integrity of the marine system. Utilization of marine resources will be judged sound or unsound from the standpoint of whether or not a permitted use insures conservation and long-term maintenance of the resource. * * * Land and water activities which are incompa- tible with the preservation of marine resources because of their potential adverse effects will be prohibited, restricted, or carefully regulated depending upon the nature of the activity and the extent of potential impact. Development of bulkheads (the vertical component of a seawall) is characterized in the Monroe County Comprehensive Plan as "shoreline modification" and is addressed in Volume II as follows: Shoreline Modification Shoreline generally requires some degree of modification before it can be utilized for development of any sort. But such modification, unless carefully planned, can have adverse effects far beyond the area directly altered for development. For this reason, all shoreline modifications are subject to close scrutiny and regulation by local, State and Federal agencies. The following guidelines should be used at the local level to minimize the impact of shoreline modifications of different types. Bulkheads and Bulkhead Lines Bulkhead lines should be set at, or landward of, the mean high water line or the landward boundary of the shoreline protection zone, which- ever is applicable. Where possible, sloping rip-rap structures and coastal vegetation should be used rather than vertical seawalls. The Monroe County land development regulations provide in pertinent part: Sec. 9.5-288. Bulkheads, seawalls, riprap and fences. Bulkheads, seawalls, riprap and fences may be allowed as principal uses where it is demonstrated that their purpose is for erosion protection or upland protection (except for the Big Pine Area of Critical County Concern). Seawalls, in any configuration to include integral steps, ladders, platforms, quays, wharfs, and integral docks landward of seawalls, are permitted, with or without a principal building, in all land use districts for the purpose of erosion control. . . . Riprap placement is permitted without a principal structure for erosion control. * * * Sec. 9.5-335. Purpose of environmental perform- ance standards. It is the purpose of this division to provide for the conservation and protection of the environmental resources of the Florida Keys by ensuring that the functional integrity of natural areas is protected when land is developed. * * * Sec. 9.5-345. Environmental design criteria. (m) Mangroves and Submerged Lands: Except as provided in paragraph (3), only piers, docks, utility pilings and walkways shall be permitted on mangroves and submerged lands; All structures on any submerged lands and mangroves shall be designed, located and constructed such that: All structures shall be constructed on pilings or other supports; Bulkheads and seawalls shall be permitted only to stabilize disturbed shorelines or to replace deteriorated existing bulkheads and seawalls; * * * d. No docking facility shall be developed at any site unless a minimum channel of twenty (20) feet in width where a mean low water depth of at least minus four (4) feet exists; No fill shall be permitted in any natural water body; No fill shall be permitted in any manmade water body unless the applicant demonstrates that the activity will not have a significant adverse impact on natural marine communities. * * * Sec. 9.5-4. Definitions. (W-1) Water at least four (4) feet below mean sea level at mean low tide means locations that will not have a significant adverse impact on off- shore resources of particular importance. For the purpose of this definition, "off-shore resources of particular importance" shall mean hard coral bottoms, habitat of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet and all designated aquatic preserves under Florida Statutes section 258.39 et seq. The land development regulations must be implemented in a manner consistent with the Monroe County Comprehensive Plan. Seawall The shoreline is generally the area between mean high water and mean low water. For regulatory purposes, the "shoreline" is considered to be mean high water. While a seawall will protect shoreline property, there are negative impacts associated with development of seawalls which merit consideration. In this case, development of the permitted seawall would involve elimination of the existing mature mangrove fringe, which filters upland runoff, and filling in the shelf, including submerged lands, which provides habitat for juvenile fish, crabs and algae. Water quality in the White Marlin Beach canals will deteriorate as additional seawalls are constructed. Wave force is increased as waves bounce off one seawall and then another, which in turn brings up sediments which may contain pollutants. Increased wave force also draws sediments out from under existing bulkheads, causing or contributing to their deterioration and adding to the suspended sediments in the canal. Riprap and coastal vegetation absorb rather than intensify wave energy. While some amount of shoreline erosion occurred on Lots 31 and 32 during the 1970s and at some time thereafter, the shorelines on Lots 31 and 32 are now stabilized by the existing mangrove fringe. Since the shorelines of Lots 31 and 32 are not presently eroding, that portion of the permit which authorizes the removal of the shoreline vegetation and development of a vertical seawall is not consistent with the Monroe County land development regulations. Rip-Rap Even if shoreline erosion were occurring, a seawall or bulkhead to stabilize the shoreline would still not be authorized under the Monroe County Comprehensive Plan and land development regulations. The shoreline on Lots 31 and 32 is gently sloping, with only about 1-1/2 feet of silt over the bedrock within the mangrove fringe. Rip-rap would be feasible on Lots 31 and 32 if shoreline erosion were to be currently taking place. Upland Erosion The Scotts are experiencing some erosion on the edges of the upland fill on Lots 31 and 32, caused by wind, rain, digging crabs, and the spreading roots of mangrove trees. Such erosion on the edges of upland fill is common in the Florida Keys. Construction of a vertical seawall, which is a shoreline stabilization technique, is not appropriate to address an upland erosion problem. Erosion of upland fill material is commonly addressed by use of a retaining wall landward of the shoreline. Development of a retaining wall on Lots 31 and 32 would not necessitate removal of the existing shoreline vegetation and placement of fill on submerged lands as authorized under the subject permit. Fill Behind Seawall The plans approved with the subject permit authorize the placement of fill behind the seawall. A portion of the proposed fill would be placed below mean high water on submerged lands. Section 9.5-345(m)(2)(4), Monroe County Code, prohibits the placement of fill in a manmade water body unless the applicant demonstrates that the activity will not have a significant adverse impact on natural marine communities. The mangrove community and submerged shelf that exist on lots 31 and 32 are natural marine communities. The permanent obliteration of the shoreline vegetation and elimination of the submerged lands that presently exist on Lots 31 and 32 would be a significant adverse impact on natural marine communities. Accordingly, the placement of fill on the submerged lands on Lots 31 and 32 is not authorized under the Monroe County land development regulations. Docks Section 9.5-345(m)(2)(d), Monroe County Code, requires that docking facilities be developed only where a water depth of at least minus four feet mean low water (-4 MLW) exists. The plans approved under the subject permit show a water depth of zero (0) feet MLW at the waterward extent of the proposed seawall/dock. The Scotts' intention is to align the seawall spanning Lots 31 and 32 with a seawall on an adjacent lot. Water depth in that approximate location, which differs from the approved site plan and is therefore not authorized by the permit, is 1.6 feet at low tide. There is not adequate water depth at the waterward side of the proposed seawall/dock, as shown either on the approved plan or as described in testimony, to accommodate a docking facility on Lots 31 and 32. Further, because the dock has a vertical seawall component, it is not designed to be constructed on pilings or other supports, as required by Section 9.5-345(m)(2)(a), Monroe County Code. Accessory Use The Monroe County land development regulations define an accessory use or structure as a use or structure that serves a principal use and is located on the same lot or lots under the same ownership and in the same land use district as the principal use or structure. The regulation specifically prohibits the establishment of an accessory use prior to the principal use to which it is accessory. Accessory uses are generally regulated based upon whether the accessory use is located on the same property as the principal use. Under the County definition of accessory use, when dealing with a single lot, the principal use must be established first. The reference to the plural "lots" accommodates larger projects which typically encompass more than one lot, such as hotels and multifamily projects. It would also encompass an individual's residence where the lots were aggregated for development. The intent of the regulation is not to restrict the accessory uses to any one of those individual lots, but to recognize that the accessory use can also extend and cover all of the lots where the principal use is located. The regulation was adopted to cure an ongoing problem in the Keys of speculative development where shoreline improvements were developed without the establishment of principal uses to increase the value of saleable lots. In this case, the principal use (the Scotts' residence) is not located on either of the two lots for which the permit was issued. To allow development of those properties prior to the establishment of principal uses on them would be inconsistent with the Monroe County land development regulation and the purpose for which it was adopted.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Florida Land and Water Adjudicatory Commission enter a final order denying permission to develop the vertical seawall/dock authorized under Monroe County building permit number 9230005939 and denying all other relief requested by the Respondents. It is further recommended that such final order specify those items set forth in paragraphs 45 and 46, Conclusions of Law, as changes in design and circumstances necessary to enable the Scotts to obtain a permit to stabilize the upland fill on the lots and entitle them to a permit or permits for docking facilities. DONE AND ENTERED this 14th day of October 1994 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October 1994. APPENDIX The following are the specific rulings on all proposed findings of fact submitted by all parties. Findings proposed by the Petitioner: With the one exception mentioned immediately below, all proposed findings of fact submitted by the Petitioner have been accepted, with occasional editorial modifications in the interest of clarity and accuracy. The one exception is paragraph 25, which was rejected as unnecessary repetition or summary of findings already made. Findings proposed by the Respondents: Paragraph 1: Accepted in substance. Paragraph 2: Rejected as subordinate and unnecessary details in view of the de novo nature of this proceeding. Paragraphs 3, 4, 5, 6, 7, 8, 9, and 10: Accepted in substance. Paragraph 11: Rejected as contrary to the greater weight of the evidence. (There is conflicting evidence on this subject. The testimony of the Petitioner's witnesses is found to be more persuasive than the version put forth by the Respondents' witnesses.) Paragraph 12: Accepted in substance. Paragraphs 13 and 14: Rejected as subordinate and unnecessary details. Paragraphs 15 and 16: Both of these paragraphs are rejected as too overly broad and imprecise to be meaningful in the context of the issues in this proceeding. More precise and detailed findings have been made regarding the nature of past and current erosion on the subject property. Paragraph 17: Rejected as too narrow a statement to be accurate. As noted in the findings of fact, other factors are contributing to the upland erosion. Paragraph 18: Rejected as not supported by persuasive competent substantial evidence. Although there is some testimony along the general lines of what is proposed in this paragraph, that testimony appears to be more nearly hyperbole than hard science. Paragraph 19: Rejected as consisting primarily of argument, rather than proposed findings of fact. Further, the last sentence of this paragraph is a conclusion that is contrary to the greater weight of the evidence. Paragraph 20: Rejected as consisting primarily of argument and proposed conclusions of law, rather than proposed findings of fact. Paragraph 21: First two sentences rejected as subordinate and unnecessary details in view of the requirements of the Monroe County Comprehensive Plan and land development regulations. Last sentence rejected as constituting a conclusion that is contrary to the greater weight of the evidence. Paragraph 22: Rejected in part as not fully supported by persuasive competent substantial evidence and in part as irrelevant. (The water being too shallow, it does not particularly matter why it is too shallow.) Paragraph 23: Rejected as subordinate and unnecessary details in view of the requirements of the Monroe County Comprehensive Plan and land development regulations. Paragraph 24: Accepted in substance with some editorial language omitted. Paragraphs 25 and 26: Rejected as constituting conclusions that are contrary to the greater weight of the evidence. COPIES FURNISHED: Sherry A. Spiers Assistant General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Carol A. Scott, Esquire KUBICKI, DRAPER, GALLAGHER & MCGRANE, P.A. 1200 City National Bank Building 25 West Flagler Street Miami, Florida 33130 James T. Hendrick, Esquire 617 Whitehead Street Key West, Florida 33040 David K. Coburn, Secretary Florida Land & Water Adjudicatory Commission 311 Carlton Building Tallahassee, Florida 32301

Florida Laws (9) 120.57120.66253.39258.39380.032380.05380.0552380.07380.08
# 6
JACK G. NICHOLS vs. DEPARTMENT OF NATURAL RESOURCES, 84-002945 (1984)
Division of Administrative Hearings, Florida Number: 84-002945 Latest Update: Sep. 25, 1985

Findings Of Fact The Petitioner, Dr. Jack G. Nichols, is a resident of the State of Illinois. He and his parents have, for many years, owned property on Dog island, a barrier island in Franklin County, Florida. Dr. Nichols owns Lots 107 and 108 on Dog Island, and has for many years entertained plans of building a beach house on each lot, consisting of a single-family residence for himself on Lot 108 and such a house on Lot 107 for his parents. Dr. Nichols has the habit of visiting Dog island to inspect his property on his vacations and has done so from time to time prior to April, 1984. Over the years he conceived of the general type of house he wished to build and determined prior to April, 1984 to locate the houses landward of the then-existing Coastal Construction Control Line. Pursuant to Chapter 161, Florida Statutes, the Department of Natural Resources undertook to survey and delineate a new Coastal Construction Control Line for Franklin County. The location of that line is described in Rule 16B- 26.14, F.A.C. and the new jurisdictional line became effective on April 30, 1984. Dr. Nichols came to Dog Island for his vacation in April, 1984, at which time he learned for the first time that the Department of Natural Resources had adopted the new Coastal Construction Control Line. After hearing of this new jurisdictional boundary from other property owners on the island, he sought to determine how that newly-defined boundary would affect his property and his plans for constructing a beach house. He observed aerial photographs depicting the Coastal Construction Control Line which would take effect April 30, 1984. He determined that the sites he had selected for the houses on his lots would be seaward of the new control line, as opposed to the preexisting line which he had taken into account in selecting his original home site. He also learned that if the houses he envisioned were under construction upon the effective date of the new Coastal Construction Control Line then he would be able to proceed with their construction without having to obtain a permit from the Department of Natural Resources. The Petitioner had not originally intended to construct the houses on his lots as early as April, 1984, but he became concerned that if he did not commence construction prior to the effective date of the new control line, he would not be able to place the houses at the location he had previously planned for. Thus, he took steps to retain a contractor and commence construction immediately. The Petitioner contacted Mr. William A. Shults, a contractor with experience building in the coastal areas of Franklin County. Mr. Shults was available and able to undertake construction activities and the two parties entered into a contract calling for construction of a beach house for both lots on approximately April 20, 1984. Mr. Shults immediately had necessary engineering work accomplished, had plans drafted for the structures and retained a construction crew. He cleared sufficient area on both lots to accommodate the residences and thereafter, on April 26, obtained a building permit for the structures. Materials were delivered to the island by landing craft on April 26 and 27, 1984. Mr. Shults also had a truck equipped with an auger or drilling equipment transported to the island and placed on the job site on or before April 27, 1984. The plans called for construction of the houses with a piling or pole foundation, so that the houses would be constructed above the specified flood levels. The poles and other materials necessary for construction of the foundation had all been delivered by April 27, 1984. The foundation lines were marked, the corner "batter boards" placed and other minor site preparation accomplished. The holes for the piling were to have been drilled on Saturday, April 28 but the trucks with the auger machine aboard, suffered a broken axle prior to its being positioned on Dr. Nichols' lots so that it was impossible to get the auger machine to the lots on April 28 or 29. Mr. Shults and his crew attempted to pull the truck to the site, but the difficulty of the terrain rendered that impossible. There was one other piece of auger equipment on the island, but its owner was engaged in construction activity with it at the time. That person agreed to bring his machine to the site on April 29 and begin augering and placing the poles for the pilings. His work became behind schedule however, and his machine was still involved in construction activity at his own site and could not be brought to Petitioner's site on that day. Mr. Shults, upon learning that the augering machine would not be available when needed, began commencing hand-digging of the pilings with post hole diggers on April 29. This method was a slow and laborious process because the holes had to be excavated much deeper than the length of the post-hole diggers. As a result, when the hole was dug as deep as the post-hole digger could reach from the surface of the ground, a hole had to be dug alongside the piling foundation hole so that a crew member could stand down in that hole and thus dig the piling hole deeper, handing the post-hole diggers with each load of dirt up to another crew member on the surface to dump, who would then hand the post-hole diggers back to the lower-placed crew member. This made the process of digging the foundation piling holes much slower than the use of the auger equipment. In this manner, however, Shults succeeded in digging four foundation holes on Lot 105. At that point, the augering machine arrived on the site and four piling holes were dug and the pertinent poles placed in them on Lot 107 as well. Throughout this construction process, Mr. Shults' crew was working on both foundations at one time. This allowed for less costly construction due to the efficiency of undertaking the same kind of work on two structures with the same crew at the same time. Since the two lots and construction sites adjoined each other, one crew could efficiently be used for both construction sites in an economic fashion. On April 30, Shults' construction crew proceeded to work on the structure on Lot 108 to further secure and place foundation posts. The four pilings placed in the holes on Lot 107 the day before remained in place. The construction crew and most of its equipment, and most construction work, was proceeding on Lot 108 merely because of the order of Mr. Shults to his crew to finish placing the foundation posts on that lot first, on that day. During the morning of that day, representatives of the Department arrived on the site and advised Mr. Shults that the construction activities appeared to be illegal and seaward of the Coastal Construction Control Line. They advised him that any further activity of that type would be undertaken at his and the lot owner's risk and expense. Mr. Shults thus ceased activities on both lots for a time, but during the following week, after discussing the dispute with certain Department employees, arrived at the opinion that the owner's construction activities had achieved grandfather status and that no permit from the Department would be required. He thus undertook to finish placing the foundation pilings on both lots. All the foundation pilings were installed on both lots by the end of the second week of May, 1984. Mr. Shults then contacted Dr. Nichols by telephone in Illinois informing him about the progress of the job, including the height of the piling. During this conversation Dr. Nichols became concerned that the pilings on Lot 107 did not project above the surface of the ground as far as he had anticipated, thus obstructing his view of the Gulf of Mexico from the beach house which would be constructed on top of the pilings. The view would be obstructed by the existing sand dune which Dr. Nichols had not wanted to disturb, hence locating his house in the more landward position at issue. In order to provide the desired view of the Gulf over the intervening sand dune, Dr. Nichols instructed Mr. Shults to replace the existing pilings on Lot 107 with longer ones. Mr. Shults purchased new pilings, had them delivered to the site, removed the original poles and installed the new ones in their place in the same holes, including the four holes that were dug prior to the effective date of the Coastal Construction Control Line. Dr. Nichols and Mr. Shults established that the original poles had been placed with the intention that they would be the permanent foundation for the house and no decision was contemplated nor made concerning their removal and replacement with the longer poles until after the foundation was fully constructed. In any event, by its letter of May 21, 1984, advising Dr. Nichols of the alleged violation of the Coastal Construction Control Line, the Department made a "free-form" determination that the construction activities on Lot 107 before April 30, 1984, were not sufficient to confer "grandfathered" status and that the activities were illegal unless a permit was obtained. The subject petition was filed and this proceeding ensued. It is true that Dr. Nichols' original intent was not to commence construction of the beach houses as soon as he did in April, 1984 and that he only began construction at that earlier time when he learned of the impending effective date of the new Coastal Construction Control Line which would require him to obtain a permit before constructing the houses at the sites he had previously selected. However, it is equally true that Dr. Nichols' bona fide intention when he retained Mr. Shults to commence construction was to not merely clear the site and place pilings and then construct the houses at some indefinite later time, but rather to commence construction and pursue construction activities on an ongoing, uninterrupted basis through to completion of both houses on both lots. If the Department had not intervened with its letter to the effect that the Petitioner might be in violation of the Coastal Construction Control Line, construction activities on Lot 107 would have continued to completion in an uninterrupted fashion. Prior to the effective date of the Department's Coastal Construction Control Line, the Petitioner's construction activity, involving the excavation for and placing of the foundation pilings for the residence to be on Lot 107, was undertaken and engaged in a continuous, uninterrupted fashion. The decision to remove the original pilings and replace them with longer poles was not envisioned, intended or made prior to the completion of the entire pole foundation for the house on Lot 107 in the first or second week of May. It was only at this time, when the poles were all installed, that it was determined by the owner and Mr. Shults that the original pilings were not long enough to confer a sufficient view of the Gulf from the house to be constructed on top of them. Thus, the removal of the original pilings and the replacement of them with longer poles in the same holes the original pilings had been installed in, was not an interruption in the construction activities, but was rather the correction of a deficiency in the original materials. This replacement did not involve an alteration or modification of the design, extent and type of materials of the original foundation (except to the immaterial extent that the replacement poles were round instead of square). In short, the construction activity undertaken after April 20, 1984 was a good faith effort to commence construction on the house on Lot 107 and continue it to completion in an uninterrupted fashion. The parties, Dr. Nichols and Mr. Shults, intended from the beginning to use the poles first placed in that foundation as the ultimate foundation for the structure, and did not intend merely placing those original poles, which were later removed, as a subterfuge to obtain a grandfathered status for the construction activity. The construction was landward of the Coastal Construction Control Line as it existed prior to April 30, 1984.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the Department of Natural Resources enter a Final Order determining that the structure on Lot 107, Dog Island, Franklin County, Florida is not in violation of the Department of Natural Resources permitting authority. DONE and ENTERED this 25th day of September, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1985.

Florida Laws (3) 120.57161.052161.053
# 7
PATRICK RUSH vs DEPARTMENT OF NATURAL RESOURCES, 93-000331 (1993)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Jan. 19, 1993 Number: 93-000331 Latest Update: Nov. 22, 1993

Findings Of Fact The subject property Petitioners, Michael and Janice Rush, are the owners of a single family residence located at 3032 North Atlantic Boulevard, Fort Lauderdale, Broward County, Florida. Such residence lies seaward of the Broward County Coastal Construction Control Line (CCCL) and is therefore subject to the permitting jurisdiction of respondent, Department of Natural Resources (Department). Section 161.053, Florida Statutes. The first application In April 1991, Petitioners filed a permit application (Permit File No. BO-267) with the Department for permission to renovate their home and construct a swimming pool. That application was found to be incomplete, and by letter of April 17, 1991, the Department notified petitioners of the information required to complete their application. Following receipt and review of the requested information, the Department, by letter of July 26, 1991, advised petitioners that, as proposed, their application to construct a pool and renovate the home would have to be denied. Pertinent to the proposed pool, such letter observed that a portion of the pool would be located seaward of the 30-year erosion projection which is prohibited 1/, the general construction line of major structures would be advanced further seaward, adverse impacts to the beach/dune system during a major storm event could be expected, and cumulative adverse impacts could be expected. Thereafter, by letter of August 14, 1991, the Department was advised that petitioners were submitting new house plans for the subject property, and that the request for leave to construct the pool had been removed from their application. 2/ On December 23, 1991, the Department issued a final order in Permit File No. BO-267 which authorized the petitioners to remodel their home. Such final order observed: . . . The direct and cumulative impacts to the beach and dune system that will be caused by both the seaward location and shore- parallel width of the proposed construction represent the maximum such impacts that are acceptable to the Department. Therefore, future construction on the site seaward of the coastal construction control line shall not extend further seaward of, or increase the shore- parallel coverage occupied by, the proposed structures approved pursuant to this permit. The pool, which petitioners had initially proposed to construct seaward of the home, but subsequently deleted from their plans, constituted a major structure, albeit nonhabitable. Rule 16B-33.002(54)(b), Florida Administrative Code. Petitioners were expressly advised by the Department of their right to request an administrative hearing pursuant to Section 120.57, Florida Statutes, to contest the provisions of the final order. No such contest was filed. 3/ The pending application On February 20, 1992, petitioners filed a new application (Permit File NO. BO-289) with the Department for permission to construct the swimming pool on their property. As proposed, the pool would be located in the beach-dune system seaward of petitioners' home, as well as seaward of an existing retaining wall on the petitioners' property. The pool would measure 16.0' x 35.7' externally, be constructed of reinforced gunite, and be supported by ten piles. The alignment of the pool would be in the shore parallel direction, rather than the shore normal direction as proposed in the prior application, thereby placing the pool landward of the 30-year erosion projection. By letter of March 8, 1992, the Department advised petitioners that their application was incomplete, and requested additional information. Petitioners submitted the final information necessary to complete their application on July 21, 1992. By letter dated October 7, 1992, received by petitioners' representative on October 13, 1992, the Department issued a public notice as follows: The referenced application for a permit pursuant to Section 161.053, Florida Statutes, has been placed on the agenda of the head of the Department of Natural Resources (Governor and Cabinet). The application will be reviewed by the Cabinet Aides in the Cabinet Meeting Room on the lower level of the Capitol, at 9:00 a.m., October 14, 1992. The application will then be heard by the Governor and Cabinet in Room LL03 of the Capitol, at 9:00 a.m., October 20, 1992. You may attend these meetings if you desire. The recommendation [for denial] shown on the enclosed agenda item has been made to the head of the Department by the Executive Director. This represents an agency determination. . . . The notice, consistent with the provisions of Rule 16B-33.012(8), Florida Administrative Code, further advised that any substantially affected person had the right to request a formal hearing, pursuant to Section 120.57, Florida Statutes, within 21 days of receipt of the notice, and that "If the decision of the Governor and Cabinet is different from the staff recommendation as noticed . . ., then the applicant or any substantially affected person shall have 21 days from the date of the Governor and Cabinet's announcement of their decision in which to petition the agency for a hearing." The basis for the Department's denial of petitioners' application to construct the swimming pool was stated as follows: The proposed swimming pool is not consistent with Rule 16B-33.005(1), Florida Administrative Code, because it has not been clearly justified by the applicant and less impactive alternatives are available. For example a similar structure could be sited in a less impactive location landward of the single-family dwelling on the southwest corner of the property. The proposed swimming pool is not designed and located pursuant to Rule 16B- 33.005(2)(a), Florida Administrative Code, for the protection of the beach/dune system in that the structure is to be sited on the seaward slope of the frontal dune and results in excavation remaining as a permanent feature below natural or existing grade. The proposed swimming pool is not designed and located pursuant to Rule 16B- 33.005(2)(c), Florida Administrative Code, for the protection of adjacent properties, because the rigid pile foundation and slabs will cause localized scour and erosion which may affect adjacent properties. The proposed swimming pool is inconsistent with Paragraph 161.053(5)(b), Florida Statutes, because the structure would extend closer to the line of mean high water than a reasonably continuous and uniform construction line in the immediate contiguous or adjacent area. The proposed swimming pool is inconsistent with Rule 16B-33.007(1), Florida Administrative Code, because the structure is not located a sufficient distance landward of the beach/dune system to permit natural shore line fluctuations and to preserve dune stability and natural recovery following storm-induced erosion. The proposed swimming pool is not designed pursuant to Rule 16B-33.007(2), Florida Administrative Code, to minimize adverse impact to the beach/dune system, because the rigid pile foundation and slabs will increase localized scour and erosion within this area as it interacts with storm waves and surge resulting in a significant adverse impact to the beach/dune system. * * * 8. The proposed project is not designed pursuant to Rule 16B-33.005(7), Florida Administrative Code, because a number of similar structures sited at the same relative location on the seaward face of the dune will result in significant cumulative impact which will threaten the beach/dune system or its recovery potential following a major storm event. The Department, therefore, may not authorize the construction of the pool. On October 13, 1992, petitioners requested that their application be removed from the agenda, and be rescheduled for "a later date to be determined." The rationale for petitioners' request was to afford "an opportunity for the permittee and staff to meet in Tallahassee in early to mid November and reach a design for a pool which can be recommended favorably by staff." By letter of October 14, 1992, the Department granted petitioners' request and the item was removed from the agenda for the Governor and Cabinet meeting of October 20, 1992. Such letter further provided that although the Department was willing to meet with petitioners to discuss the staff concerns about their application, that it "must caution you . . . that at this time I do not anticipate that a swimming pool, as you requested, can be satisfactory [sic] located seaward of your home." Petitioners and the Department were unable to resolve their dispute. Accordingly, petitioners filed a petition on November 2, 1992, to contest the proposed denial of their application. By letter of November 13, 1992, the Department advised petitioners that their request for formal administrative hearing was inadequate, but accorded them 14 days from receipt of such letter to submit an appropriate request. Petitioners timely submitted an appropriate request for hearing on November 30, 1992, and the matter was thereafter referred to the Division of Administrative Hearings for the assignment of a Hearing Officer to conduct a formal hearing pursuant to Section 120.57(1), Florida Statutes. 4/ The merits of the pending application As heretofore noted in the findings of fact, the Department enunciated seven reasons to support its denial of petitioner's application. The first basis for denial was the Department's assertion that the proposed swimming pool was not consistent with Rule 16B-33.005(1), Florida Administrative Code, "because it has not been clearly justified by the applicant and less impactive alternatives are available." In this regard, it is observed that Rule 16B-33.005(1), Florida Administrative Code, provides: . . . Establishment of a coastal construction control line . . . does not preclude all development of or alteration of coastal property seaward of such lines. However, activities seaward of a coastal construction control line . . . shall be limited and the necessity of such development, construction or alteration shall be stated and clearly justified by the applicant. (Emphasis supplied) The aforesaid rule does not further explain what is contemplated by the requirement that the applicant clearly justify the "necessity" of the proposed development; however, the plain and ordinary meaning of the word can be ascertained by reference to a dictionary. 5/ In this regard, "necessity" is defined to mean "something that cannot be done without." Websters New Twentieth Century Dictionary. It is also defined as "something needed for the existence, effectiveness, or success of something (a requirement)," and "the state or fact of being required or unavoidable." The American Heritage Dictionary of the English Language. Here, the proof fails to demonstrate any "necessity" to construct the swimming pool since it fails to credibly support the conclusion that such construction is required for the effective or reasonable use of petitioners' property or that such construction is essential for the well-being of its occupants.6/ To the contrary, the petitioners' decision to construct the pool is merely a matter of personal preference or convenience. Moreover, the proof fails to demonstrate any "necessity" to construct a pool of the size and configuration proposed (16' x 35.7' with a maximum depth of 8') or of the materials selected (reinforced gunite supported by piles). Indeed, a pool of a different configuration or size could be located elsewhere on the property and the pool could be constructed on a base slab foundation or of vinyl to alleviate the adverse effects of its current design, discussed infra. 7/ As further reasons for denial, the Department concluded that construction of the swimming pool was not consistent with Rule 16B-33.005(2)(a), Florida Administrative Code, "for the protection of the beach/dune system in that the structure is to be sited on the seaward slope of the frontal dune and results in excavation remaining as a permanent feature below natural or existing grade"; Rule 16B-33.005(2)(c), Florida Administrative Code, "for the protection of adjacent properties, because the rigid pile foundation and slabs will cause localized scour and erosion which may affect adjacent properties"; Rule 16B- 33.007(1), Florida Administrative Code, "because the structure is not located a sufficient distance landward of the beach/dune system to permit natural shoreline fluctuations and to preserve dune stability and natural recovery following storm-induced erosion"; and Rule 16B-33.007(2), Florida Administrative Code, "to minimize adverse impact to the beach/dune system, because the rigid pile foundation and slabs will increase localized scour and erosion within this area as it interacts with storm waves and surge resulting in a significant adverse impact to the beach/dune system." Pertinent to the aforesaid reasons for denial, Rule 16B-33.005(2), Florida Administrative Code, the "Department Policy Statement on Permits," provides: Seaward of the coastal construction control line . . ., special siting, structural and other design considerations are required: (a) for the protection of the beach-dune system; * * * (c) for the protection of adjacent properties. And, Rule 16B-33.007, Florida Administrative Code, the "Structural and Other Requirements Necessary for Permit Approval," provides: The proposed structure or other activity shall be located a sufficient distance landward of the beach-dune system to permit natural shoreline fluctuations and to preserve the dune stability and natural recovery following storm induced erosion . . . . All structures shall be designed so as to minimize any expected adverse impact on the beach-dune system or adjacent properties and structures and shall be designed consistent with Section 16B-33.005, Florida Administrative Code. Relevant to such rules, the proof demonstrates that the frontal dune on the subject property appears to have been leveled at an elevation of approximately +12.0 feet NGVD, and petitioners' home is located on top of the crest of the frontal dune. The seaward slope of the frontal dune begins at the seaward face of the house and slopes down to the beach. Approximately 12 feet seaward of the house is an existing retaining wall. The proposed pool will be sited immediately seaward of such wall and therefore on the seaward slope of the frontal dune. The proposed pool is a pile supported concrete swimming pool with exterior dimensions of 16.0' shore-normal by 35.7' shore-parallel, and a maximum depth of 8.0'. The foundation is specified to be auger-cast piles, which will penetrate to an elevation of -23.0' NGVD or 3' embedment where a rock layer is encountered. The elevation of the pool is proposed at +13.0' NGVD, with a bottom elevation of +4.0' NGVD. As designed and sited, construction of the pool would destabilize the dune, hinder its function of protecting upland development during a storm event, and adversely affect natural shoreline fluctuation and recovery following storm induced erosion. In this regard, the proof demonstrates that the location of the pool seaward of the existing retaining wall would interrupt the natural continuity of dune formation because sand would accumulate seaward of the pool in a less stable location and would impede the accumulation of sand on adjacent properties. Construction of the pool, as designed and sited, would also induce scour during the course of a storm event impacting the structure. Such storm- induced scour, in addition to erosion, would cause the loss of additional sand at the vicinity of the structure, robbing the beach-dune system of additional sand necessary to protect upland structures, and would also contribute to the potential failure of the structure itself and other upland structures. In this regard, the proof demonstrates that approximately 1,000 cubic yards of sand would be lost on petitioners' section of the beach in the event of a 10-year storm. Additionally, structure-induced scour of 77.5 cubic yards from the ten piles, 120.4 cubic yards from the pool shell, and 15.8 cubic yards from the "end effects" of the pool (the amount of structure-induced scour from the ends of the structure) might reasonably be anticipated in the event of a 10-year storm. If the pool were to be impacted by a higher frequency storm, such as a 20-year or a 100-year storm, scour and erosion would increase. 8/ As an additional basis for denial, the Department concluded that construction of the pool was not consistent with Section 161.053(5)(b), Florida Statutes, "because the structure would extend closer to the line of mean high water than a reasonably continuous and uniform construction line in the immediate contiguous or adjacent area." Here, the proof supports the Department's conclusion. As its final basis for denial, the Department concluded that construction of the pool was not consistent with Rule 16B-33.005(7), Florida Administrative Code, "because a number of similar structures sited at the same relative location on the seaward face of the dune will result in significant cumulative impact which will threaten the beach/dune system or its recovery potential following a major storm event." Pertinent to the aforesaid basis for denial, Rule 16B-33.005(7), Florida Administrative Code, provides: An individual structure or activity may not have an adverse impact on the beach or dune system at a specific site; however, a number of similar structures or activities along the coast may have a significant cumulative impact resulting in the general degradation of the beach or dune system along that segment of shoreline. The Department may not authorize any construction or activity whose cumulative impact will threaten the beach or dune system or its recovery potential following a major storm event . . . . Here, petitioners' project is expected to have significant adverse impacts to the beach-dune system as a consequence of its design and siting. Accordingly, the provisions of Rule 16B-33.005(7), Florida Administrative Code, are not relevant. Moreover, there was no proof concerning any similar structures along the coast, existing or proposed, that would contribute to or intensify the degradation of the beach-dune system occasioned by the proposed project. Accordingly, it cannot be concluded that cumulative impact is a relevant issue in these proceedings. While cumulative impact is not relevant to the pending application, the other reasons advanced by the Department for denial of the application have, as heretofore found, a rational basis in fact. Under such circumstances, petitioners have failed to demonstrate their entitlement to the subject permit.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be rendered denying petitioners' application to construct seaward of the CCCL. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 22nd day of November 1993. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of November 1993.

Florida Laws (5) 120.57120.60120.62161.052161.053
# 8
GULF COAST DEVELOPMENT SERVICE, INC. vs DEPARTMENT OF FINANCIAL SERVICES, DIVISION OF WORKERS' COMPENSATION, 13-001977F (2013)
Division of Administrative Hearings, Florida Filed:LaBelle, Florida May 24, 2013 Number: 13-001977F Latest Update: Jun. 26, 2014

The Issue Whether Respondent, Department of Financial Services, Division of Workers' Compensation (Department or Respondent), should pay Petitioner, Gulf Coast Development Service, Inc.'s (Petitioner or Gulf Coast Development), attorney's fees and costs under section 57.111, Florida Statutes (2012),1/ for initiating Division of Administrative Hearings (DOAH) Case No. 13-0798.

Findings Of Fact The parties stipulated to the following facts set forth in this paragraph: The Department is the state agency responsible for enforcing the statutory requirement that employers secure the payment of workers' compensation for the benefit of their employees and corporate officers. Petitioner, a Florida corporation, was engaged in the Florida construction industry on February 12, 2013. On February 12, 2013, Leida Perez, workers' compensation compliance investigator for the Department (Investigator Perez), commenced an investigation at 577 Gulfshore Boulevard, Naples, Florida 34102 (job site), to determine whether the individuals performing construction industry work at the job site were compliant with the workers' compensation insurance coverage requirements of chapter 440, Florida Statutes. Quang Dinh is the owner and corporate officer of Gulf Coast Development. The Department issued a Stop-Work Order and Order of Penalty Assessment to Petitioner on February 12, 2013. The Department served a Request for Production of Business Records for Penalty Assessment Calculation to Petitioner on February 12, 2013. The calculations and the methodology applied by the Department's penalty auditor in the Amended Order of Penalty Assessment that was issued to Petitioner by the Department on February 27, 2013, and revoked on May 3, 2013, are not in dispute. Petitioner does not owe any Amended Order of Penalty Assessment to the Department. Bob Simat, drywall supervisor for Advantage Plastering and Finish Carpentry, contacted Gilberto Zepeda directly to perform the drywall operations at the job site. Mr. Simat was under the impression that Mr. Zepeda and his brother both worked for Gulf Coast Development. Discovery in this matter concluded on April 29, 2013, when the Department received check images from Petitioner's bank account. The Department issued and served an Order Releasing Stop-Work Order (Revocation) to Petitioner on May 3, 2013. Petitioner is a bona fide "small business" and incurred legal fees and costs for this action. The Department revoked the February 12, 2013, Stop-Work Order, and, therefore, Petitioner is the prevailing party in the underlying action within the meaning of section 57.111(3)(c). On February 12, 2013, when Investigator Perez arrived at the job site, she observed Gilberto and Enrique Zepeda (Zepedas) performing drywall finishing work. Upon inquiry, the Zepedas informed Investigator Perez that they were performing the drywall finishing work for their employer, Gulf Coast Development, and provided her with Quang Dinh's cellular phone number. As previously noted, Investigator Perez is an investigator with the Department's Division of Workers' Compensation. When Investigator Perez arrived at the job site on February 12, 2013, a representative from the Department's Division of Insurance Fraud (Fraud Unit) was also present. In the presence of Investigator Perez, the representative from the Fraud Unit received from the Zepedas the same information that they provided to Investigator Perez regarding their employment status with Gulf Coast Development. While meeting with Investigator Perez and the representative from the Fraud Unit, the Zepedas memorialized their verbal statements by each executing an affidavit, and affirmatively stating therein that they were employed by Petitioner. Soon after receiving Mr. Dinh's phone number from the Zepedas, Investigator Perez phoned Mr. Dinh. When Mr. Dinh answered his phone, Investigator Perez identified herself and explained that she was with the Zepeda brothers. During the conversation with Mr. Dinh, Investigator Perez asked whom he used for workers' compensation coverage. Mr. Dinh replied "I am working on it," and the phone was disconnected. Investigator Perez immediately placed a second call to Mr. Dinh, and it was during this conversation that Mr. Dinh agreed to meet her at the job site. After speaking with Mr. Dinh, Investigator Perez contacted Advantage Plastering, a contractor at the job site, who informed her that they had hired Petitioner to perform the drywall finishing work. Following her conversation with the representative from Advantage Plastering, Investigator Perez, through the use of her mobile personal computer, searched the Department of State, Division of Corporations', website database (Sunbiz) for information on Gulf Coast Development. The information found on Sunbiz showed that Petitioner had been an active Florida corporation since May 9, 2007, that 27614 Imperial Shore Boulevard, Bonita Springs, Florida 34134, was the company's principal address, and that Quang Dinh was president of the corporation. Next, Investigator Perez checked the Department's Coverage and Compliance Automated System (CCAS) for information on proof of coverage and exemptions for Petitioner. CCAS revealed that Petitioner did not have any active coverage, but did have an exemption for Mr. Dinh. An exemption is a method by which a particular corporate officer can become exempt from the requirement to obtain workers' compensation insurance coverage, as authorized by section 440.05, Florida Statutes. When Mr. Dinh arrived at the job site, Investigator Perez again asked him about the company's current workers' compensation coverage, to which Mr. Dinh again replied, "I am working on it." Mr. Dinh then gave Investigator Perez a folder containing a blank application for workers' compensation insurance coverage. Based on her interviews with the Zepedas, Advantage Plastering, and Mr. Dinh, along with the information obtained from Sunbiz and CCAS, Investigator Perez determined that the Zepeda brothers were employed by Petitioner and that the Zepedas were not covered by workers' compensation insurance coverage. Given this information, Investigator Perez issued Petitioner a Stop-Work Order. Mr. Dinh testified that when he arrived at the job site, he informed Investigator Perez that the Zepedas were not his employees. Even if Mr. Dinh informed Investigator Perez that the Zepedas were not employees of Gulf Coast Development, his assertion was insufficient to negate the verbal and sworn statements given to Investigator Perez by the Zepedas and, moreover, conflicted with his previous statements to Investigator Perez that he was "working on" getting workers' compensation coverage for the Zepedas. In March 2013, the Zepedas recanted their earlier statements that they were employed by Gulf Coast Development. On May 3, 2013, Respondent issued an Order Releasing Stop-Work Order (Revocation). The facts uncovered in Investigator Perez's investigation on February 12, 2013, provided the Department with a reasonable basis to issue the Stop-Work Order to Petitioner.

Florida Laws (3) 120.68440.0557.111
# 9
ROBERT W. DODT vs. DNR & NANNETTE K. SCOGGINS, 84-003997 (1984)
Division of Administrative Hearings, Florida Number: 84-003997 Latest Update: Sep. 11, 1985

Findings Of Fact Nannette K. Scoggins is the owner of the real property located at 5622 Gulf Drive, Holmes Beach, Florida in Manatee County. Nannette K. Scoggins' property, the petitioner's property, 5624 Gulf Drive, and the other adjacent property, 5620 Gulf Drive, are zoned as "A-1 Hotel-Motel" under the City of Holmes Beach Zoning Ordinance. On November 13, 1983, Mrs. Scoggins submitted to DNR an application for a permit for construction seaward of the coastal construction control line (control line). The proposed project, known as Jansea Place, would consist of two multifamily dwellings, four units to a building, divided by a swimming pool. A portion of the most seaward building would extend a maximum of 57 feet seaward of the control line. By letter dated July 11, 1984, DNR notified petitioner that the department was considering the permit application. The petitioner responded by letter dated July 18, 1984, objecting to any construction seaward of the control line. On October 1, 1984, petitioner received notification that DNR intended to recommend approval of the permit. The permit was scheduled for a vote by the Governor and Cabinet on October 16, 1984. The staff of DNR recommended approval of the permit. By telegram dated October 15, 1984, the petitioner requested an administrative hearing, and on October 22, 1984, petitioner filed a petition for a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes. The application for permit No. ME-89 is a complete application for permit to construct seaward of the coastal construction control line. On October 5, 1983, the Superintendent of Public Works of the City of Holmes Beach certified that this project does not violate any ordinance of the City of Holmes Beach. The plans for the proposed project are signed and sealed by an architect registered in the State of Florida, and the submitted plans comply with the design standards established in Rule 16B-33.07, Florida Administrative Code to resist adequately the natural forces associated with a 100-year return interval storm event. The plans, specifications, drawings and other information submitted to DNR with the application for permit to construct seaward of the coastal construction control line are complete and accurate, and meet the requirements of DNR for that purpose. Under the provisions of Rule 16B-33, Florida Administrative Code, the application was determined to be complete on August 6, 1984. The proposed construction is located landward of an existing vertical concrete bulkhead. The seawall was built jointly by the Scoggins and Mr. McLean, who owns the property immediately to the south of the Scoggins' property. The seawall was built after the hurricane of 1972 because the existing dune system had been destroyed. Since that time, the mean high water line has continued to encroach landward to the point where it is now east of the wall. However, the seawall is not necessary for the protection of the proposed building. Although the seawall would fail under the direct impact of a major hurricane, the proposed building is adequately designed to withstand the impact erosion, the wave loads, the winds, and the water forces associated with a major hurricane. The necessity and justification for the project's location in relation to the control line is stated in the application, and petitioner has not challenged the necessity or justification. The City of Holmes Beach Zoning Ordinance requires that the buildings be separated by a minimum of 30 feet. Since the proposed buildings are separated by 30 feet, the proposed seaward building is located as far landward as possible without violating the zoning ordinance. Erosion and structural damage occurred as a result of Hurricane Agnes in 1972 and the "No Name" storm in 1982 in the area between 1,000 feet south of the Scoggins' property and 500 feet north of the Scoggins' property. Although the beach was fairly stable from 1974 to 1979, the beach began to erode in 1980. When the seawall was built in 1974, the dune line was even with the seawall. However, as can be seen from a comparison of the photographs taken in June of 1979 with those taken in early 1985, the beach has eroded since June of 1979 and the dune line is now several feet landward of the seawall. The DNR recommendation for approval of the Scoggin's permit application was based upon historical erosion data for the period between 1940 and 1974, which was the most recent data available that could be used to review the project. Mr. Clark stated that the application was recommended for approval based on the design of the proposed building and its alignment with existing structures built seaward of the control line. The proposed project is located landward of a line of existing structures. Although the adjacent properties have been affected by erosion, there was no evidence presented to show that the existing structures located seaward of the control line have been unduly affected by erosion. In 1974, when the seawall was being constructed, the worker building the seawall dug up part of the petitioner's property and destroyed the sea oats he had planted. However, the proposed project has a driveway encircling the building which would provide vehicular access to the seawall if necessary. The proposed project will partially obstruct petitioner's view to the southwest. However, there was no evidence presented that petitioner's property or the other adjacent property, would be adversely affected in any other way by the proposed project. There was no evidence presented that the proposed project would be affected by, or have an effect on, beach or coastal erosion. The proposed project would have no effect on the beach dune system.

Recommendation Upon consideration of the foregoing, it is recommended that DNR issue Permit Number ME-89 to Nannette K. Scoggins. DONE and ENTERED this 28th day of June, 1985, in Tallahassee Leon County Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of June, 1985.

Florida Laws (3) 120.57161.0536.04
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer