The Issue Whether disciplinary action should be taken against Respondent's contracting license based on the violations as charged in the Administrative Complaint in this proceeding.
Findings Of Fact Based on the evidence and testimony of the witnesses presented and the entire record in this proceeding, the following Findings of Fact are made: Respondent is a certified contractor, having been issued License No. CGC 1506923 by the Florida Construction Industry Licensing Board. Respondent's licensure as a certified general contractor is "Current, Active." Respondent is the primary qualifying agent for his company, Transflorida Corporation, which has a Certificate of Authority as a Contractor Qualified Business, License No. QB 29658; that licensure is "Current." On or about July 3, 2006, Peter Cali entered into a written contractual agreement with Respondent, d/b/a Transflorida Corporation, for the construction of an addition to his residence at 2103 Lake Pickett Road, Orlando Florida. The original contract price between Respondent and Mr. Cali was $60,000.00. On July 3, 2006, Mr. Cali paid a total of $30,000.00 to Respondent. Respondent delivered some bricks to the Cali residence and had the septic tank pumped out. With the exception of the foregoing, Respondent failed to accomplish any meaningful work on the project. Respondent abandoned the project. Mr. Cali telephoned Respondent repeatedly requesting that Respondent perform the construction as agreed. Mr. Cali did nothing to inhibit Respondent's performance of the construction contract. Although requested, Respondent did not refund any money to Mr. Cali. Mr. Cali did not benefit as a result of the delivery of the bricks or the pumping of the septic tank. Mr. Cali's "out of pocket" damages are $30,000.00. Petitioner's total investigative cost for the case is $701.63. Respondent has been the subject of seven final orders revoking his professional license and fining him a total $230,000.00.2/
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered as follows: Finding Respondent guilty of having committed one violation of Subsection 489.129(1)(g)2., Florida Statutes, as alleged in Count II of the Administrative Complaint, and imposing as a penalty an administrative fine in the amount of $5,000.00; Finding Respondent guilty of having committed one violation of Subsection 489.129(1)(j), Florida Statutes, as alleged in Count III of the Administrative Complaint, and imposing as a penalty an administrative fine in the amount of $5,000.00; Finding Respondent guilty of having committed one violation of Subsection 489.129(1)(m), Florida Statutes, as alleged in Count IV of the Administrative Complaint, and imposing as a penalty an administrative fine in the amount of $5,000.00; Requiring Respondent to pay financial restitution in the amount of $30,000.00 to Peter Cali; Assessing cumulative cost of investigation and prosecution in the total amount of $701.63, which excludes costs associated with any attorney's fees; and Permanently revoking Respondent's license as a result of the numerous violations and the financial harm sustained by Peter Cali. DONE AND ENTERED this 10th day of June, 2008, in Tallahassee, Leon County, Florida. S JEFF B. CLARK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of June, 2008.
Findings Of Fact Based upon the record evidence, the Hearing Officer makes the following findings of fact: Martin Gold is now, and has been since July, 1986, licensed by Petitioner as a Registered Specialty Contractor authorized to do painting and waterproofing work in Dade County. He holds license number RX 0051718, which expires June 30, 1989. Since receiving his license he has been disciplined twice by the Florida Construction Industry Licensing Board. Gold is the President of Team Leisure Corp., a construction company, and is also its "qualifying agent." On August 14, 1986, Team Leisure Corp. entered into a written contract with Terry Dudley and his wife, Patricia, in which it agreed, for $12,000, to build a two-room, 27-foot by 13- foot addition to the Dudley home located at 15510 Leisure Drive in Dade County and to install new windows in the existing structure. According to the terms of the agreement, Team Leisure was to do "no painting." In his capacity as President of Team Leisure Corp., Gold hired William Sernaker to directly oversee the completion of the construction work specified in the Dudley contract. At the time, Sernaker was licensed as a general contractor in Dade County. As part of his arrangement with Gold, Sernaker assumed responsibility for ensuring that all work permits and inspections necessary to complete the Dudley project were obtained. On September 4, 1986, Sernaker obtained a building permit for the Dudley project. Thereafter, work on the project commenced. The foundation for the addition was laid and, on September 10, 1989, it passed the inspection of James Tucker, a Dade County building inspector. Fifteen days later, Tucker conducted a tie beam inspection. This phase of the project also received his formal approval. Sernaker obtained a roofing permit on October 14, 1986. The exterior of the roof was inspected by Russell Bergsma, another Dade County building inspector, on October 21, 1986. It too passed inspection. An electrical permit was obtained for the Dudley project on November 17, 1986, by Robins Electric, a subcontractor. When the electrical work was initially inspected by Grant Morse, another Dade County building inspector, it was rejected because there were a "few outlets missing." The record is unclear as to the results of any subsequent electrical inspections. Morse also conducted an inspection of the framing work done on the Dudley project. He did so on or around November 21, 1986. In his view, the framing was "not to code." Accordingly, he left a "tag" at the job site on which he gave the following written explanation for his rejection of the framing work: All window bucks must be tight with caulking, no gaps. When the stucco meets the window frame, it should be set back at approximately a 45-degree angle at a width of one quarter to provide a groove to be filled with caulking. Continuous back bed of caulking must be maintained. A follow-up inspection of the framing work was performed by Bergsma on December 1, 1986. In Bergsma's opinion, while some corrections had been made, deficiencies remained. He therefore issued another rejection. A third framing inspection was conducted on December 3, 1986. Tucker was the inspector who performed this inspection. He approved the work that had been done. Prior to this inspection, Gold had paid another contractor $600 to "redo" the framing. This additional expense was not passed on to the Dudleys. Morse attempted to conduct a final building inspection on December 22, 1989. He was unable to do so, however, because "[n]o one was home." From the outset, Gold kept abreast of the progress that was being made on the Dudley project by communicating with Sernaker. He also visited the job site on at least a weekly basis. Gold also heard from the Dudleys concerning the status of the project. The Dudleys closely monitored the work of Sernaker and his crew. If the work was not done to their satisfaction, they expressed their disapproval to Sernaker and, if he did not rectify the matter, they complained to Gold over the telephone. The following were among the complaints made by the Dudleys: the foundation was not level; the roof did not contain any fiberglass material; the window frames did not fit properly; the wood used for the open beam ceilings had cracks in it and was unsightly; the walls in the den were not level and had cracks in them; the linoleum on the Dudleys' screened-in porch was ripped by workers putting up a wall; the outside stucco was cracking and peeling; and trash was left on the property. An effort was made to address the Dudleys' concerns. For instance, in response to the Dudleys' complaints, a "thin cap" was placed over the foundation to make it level. The roof was redone with fiberglass material. The Dudleys were reimbursed for the linoleum they needed to replace on their porch. A contractor was hired to correct the framing problem. Nonetheless, the Dudleys became increasingly dissatisfied with Team Leisure Corp.. Sometime shortly before January 6, 1987, they became so dissatisfied that they ordered Sernaker and his crew off their property and refused to make any additional payments. Following this incident, Gold met with the Dudleys and attempted to mollify them. This was his first face-to-face meeting with them. He offered to send another contractor to the Dudleys' home to perform the work the Dudleys believed needed to be done to satisfactorily complete the project. The Dudleys accepted this offer. On January 6, 1987, Gold sent the Dudleys a letter which read as follows: As per our mutual agreement, these are the items you requested be taken care of. Once taken care of, you agree to sign completion certificate so we can be funded. COMPLETED (please check upon satisfaction) 1.) Touch up outside windows. 2.) Windows to be locked in. 3.) Walls in den to be taken down and leveled out. 4.) Frame around closet door. 5.) Fix two windows; replace concrete in doors and windows. 6.) Clean up. 7.) Replace vinyl, in rear den. 8.) $100.00 dollars to Mrs. Dudley, for clean-up. 9.) 10 year guarantee- roof and release of lien [sic]. 10.) Concrete over build. 11.) Crack under window sill. 12.) Nail in door frame. 13.) Gaps in drywall bedroom. 14.) Stucco cracking outside. 15.) Electrical inspection. (not to be Mike Charles.) Accepted and Approved: x x After receiving this letter, Mr. Dudley checked all but items 2, 5, 6, 8, and 9 on the letter's "completion certificate." Neither he nor his wife, however, signed this "completion certificate." Although the cracks in the outside stucco had been repaired at the time Dudley checked item 14, the stucco subsequently started cracking again. A final building inspection of the Dudley project was conducted by Tucker on January 13, 1989. The project was "turned down" by Inspector Tucker because it was unpainted. Under their contractual agreement, the Dudleys, not Team Leisure Corp., were responsible for the painting of the project. The painting was not done because the Dudleys noticed cracks reappearing in the outside stucco. On or around March 4, 1987, Mr. Dudley telephoned Inspector Bergsma and asked him to conduct an informal field inspection of the project. Bergsma complied with Dudley's request. When he arrived at the Dudley home, Dudley showed him a "gap on the rear of the house ... where the two roofs are at different levels and come together." Bergsma told Dudley that "[i]t didn't belong there" and that it would have to be eliminated if the structure was to pass a final building inspection. As of the date of the hearing, the structure had not passed such an inspection. Team Leisure Corp. received $10,200 for the work done in connection with the Dudley project. The remaining $1,800 of the $12,000 that the Dudleys were to pay pursuant to the contract was held in escrow by a bank. Ultimately, this $1,800, along with approximately an additional $500 from Team Leisure Corp., was given to the Dudleys as part of a settlement between them and Team Leisure Corp.. The money was to be used by the Dudleys to pay another contractor to complete the project to their satisfaction.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Construction Industry Licensing Board enter a final order (1) finding Respondent guilty of contracting outside the scope of his license in violation of Section 489.129(1) (j) , Florida Statutes; (2) imposing a $750 administrative fine upon Respondent for said violation, and (3) dismissing the remaining charges against Respondent set forth in the instant administrative complaint. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 30th day of May, 1989. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of May, 1989. COPIES FURNISHED: Elizabeth Alsobrook, Esquire Northwood Centre 1940 North Monroe Street Suite 60 Tallahassee, Florida 323399-0792 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Carlos Garcia, Esquire 8603 Dixie Highway Suite 400 Miami, Florida 33143 =================================================================
Findings Of Fact At all times material to these proceedings, the Respondent, David R. Knight, held a registered general contractor's license numbered RG 007907 issued by the State of Florida, Department of Professional Regulation, Construction Industry Licensing Board initially in July, 1968. Respondent's license is presently in an inactive status for failure to renew but renewal can be accomplished by Respondent paying the required renewal fee only. On May 13, 1983, Respondent contracted with Joseph Cobb to remodel a house in Milton, Florida. The contract price was $23,800.00. The Respondent began the remodeling and when the project was approximately 50 percent completed, left the site. Joseph Cobb, on numerous occasions, offered to work with the Respondent in any way to finish the project, but the Respondent failed to return. Joseph Cobb paid Respondent $19,100.00 from May 14, 1983 through June 23, 1983. In addition, although the contract required Respondent to pay for all supplies and materials, Cobb paid $2,300.98 for supplies and material used in the remodeling. Respondent failed to pay Gary Rich Plumbing for the plumbing work done on the Cobb residence. Joseph Cobb was forced to pay Gary Rich $1,200.00 in order to avoid a lien being filed on his home. Respondent was not licensed to contract in Milton, Santa Rosa County, Florida, when he contracted with Joseph Cobb to perform remodeling. In June, 1982, Respondent contracted with Pearlie Rutledge to remodel a house at 608 North D Street, Pensacola, Florida, Escambia County. The contract price was $17,000.00. The Respondent began the construction without obtaining a building permit which is in violation of Section 106 Standard Building Code as adopted by the City of Pensacola Ordinance 81-83. Respondent deliberately and in a hurry left the site of construction when the building inspector appeared on the job. The Respondent was not licensed in Escambia County or the City of Pensacola to practice contracting. Pearlie Rutledge paid Respondent $5,000.00 which the Respondent failed to return when the remodeling was stopped by Charles Humphreys, Housing Inspector for the City of Pensacola. Pearlie Rutledge obtained a Final Judgement against the Respondent for $4,557.00 which has not been paid by the Respondent. Respondent's "81-82' and "82-83", Okaloosa County Occupational License was issued to David Knight doing business as "Your Way Construction." However, there was no evidence presented at the hearing that Respondent ever contracted in the name of "Your Way Construction." In fact there is evidence that during the year 1983 he contracted with Cobb as David Knight, General Contractor and not as David Knight, General Contractor, d/b/a Your Way Construction. (See Petitioner's Exhibit No. 1.)
Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the Board enter a final order Dismissing Counts II, V and VI of the Administrative Complaint filed against the Respondent. It is further RECOMMENDED that the Board enter a final order finding Respondents guilty of the violation charged in Counts I, III and IV of the Administrative Complaint filed against the Respondent and for such violation it is RECOMMENDED that the Board revoke the Respondent's registered general contractor's license numbered RG 0007907, to practice contracting in the State of Florida Respectfully submitted and entered this 9th day of January, 1986, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 9th day of January, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-3836 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the Petitioner to this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Adopted in Finding of Fact 1. Exhibit 1). 3. Adopted in Finding of Fact 3. 4. Adopted in Finding of Fact 4. 5. Adopted in Finding of Fact 5. 6. Adopted in Finding of Fact 6. 7. Adopted in Finding of Fact 7. 8. Adopted in Finding of Fact 8. 9. Adopted in Finding of Fact 9. 10. Adopted in Finding of Fact 10. 11. Adopted in Finding of Fact 11. 12. Adopted in Finding of Fact 12. Adopted in Finding of Fact 2 except for contract amount which should have been $23,800. (See Petitioner's Respondent Did Not Submit Any Proposed Findings of Fact COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Post Office Box 2 Jacksonville, Florida 32202 Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee Florida 32301 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. David R. Knight 1215 East Hayes Street Pensacola, Florida 32503
The Issue This is a license discipline proceeding in which the Petitioner seeks to take disciplinary action against the Respondent on the basis of alleged violations of Chapter 489, Florida Statutes, (1992 Supp.). Specifically, the Respondent has been charged in a four-count Administrative Complaint with violations of paragraphs (k), (m), (n) and (p) of Section 489.129(1), Florida Statutes (1992 Supp.).
Findings Of Fact Respondent is, and has been at all times material hereto, a licensed Certified General Contractor, having been issued license number CG C007303, by the State of Florida. At all times material hereto, the Respondent was licensed to contract as an individual. On September 18, 1992, the Respondent, doing business as an individual, contracted with Charles and Elba Williams (hereinafter referred to as "Customers") to reroof their dwelling and shed at 15205 SW 78 Place, Miami, Florida, for the price of Fifteen Thousand, One Hundred Seventeen dollars ($15,117.00). On October 1, 1992, the aforementioned contract was amended to provide for the payment of half of the second draw before the second stage of the project was completed, and to provide for the payment of an additional Three Hundred and Fifty One dollars ($351.00) in materials. On November 5, 1992, the aforementioned contract was amended to provide the Customers with a credit on the contract of One Thousand, Six Hundred Thirty Six dollars and Sixty Four cents ($1,636.64) for their purchase of roof shingles. The revised contract price was Sixteen Thousand and Fifty Eight dollars ($16,058.00). The Customers paid the Respondent Twelve Thousand, Two Hundred Seventy Seven dollars and Ninety cents ($12,277.90) toward the contract. After receiving a credit on the balance due on the contract, the Customers owed Two Thousand, One Hundred Forty Two dollars and Thirty Two cents ($2,142.32) to the Respondent. On September 23, 1992, the Respondent obtained roofing permit number 92-110050 for the Customers' project from the Dade County Building and Zoning Department. The Respondent worked on the Customers' roof from September 23, 1992, through November 15, 1992, when the installation of the shingles was completed. On November 19, 1992, the Respondent failed a final inspection performed on the Customers' roof by the Dade County Building and Zoning Department because the Respondent failed to supply Dade County with product approval information and manufacturer installation specifications for the ridge vent he had installed. On November 24, 1992, the Respondent again failed a final inspection performed on the Customers' roof by the Dade County Building and Zoning Department for the same reason as on November 19, 1992. The Respondent never obtained a passing final inspection on the Customers' roof from the Dade County Building and Zoning Department. On November 24, 1992, the Customers sent the Respondent a Certified letter, Return Receipt requested, informing the Respondent that the roof could not pass final inspection until Dade County was provided with the product approval information and manufacturer installation specifications for the ridge vent he had installed. On December 4, 1992, the Respondent was issued a Notice of Violation from the Dade County Building and Zoning Department for failure to provide product approval information and manufacturer installation specifications for the ridge vent that had been installed on the Customers' roof. On December 4, 1992, the Respondent was issued a Notice of Violation from the Dade County Building and Zoning Department for failure to remove construction debris from the Customers' property. The Respondent did not comply with either Dade County Notice of Violation and did not supply the Dade County Building and Zoning Department with the product approval information and manufacturer installation specifications for the ridge vent that had been installed on the Customers' roof. The Customers were left with a roof that did not comply with Dade County Code. On March 26, 1993, the Customers paid a Forty Five dollar ($45.00) renewal fee to the Dade County Building and Zoning Department and had the roofing permit renewed and reissued in their own names. On March 4, 1993, the Customers paid another contractor, Mark Mitchell, Two Hundred dollars ($200.00) to remove the ridge vent and close the hole in the roof left by the removal of the ridge vent. On March 27, 1993, after the ridge vent had been removed, the Customers paid a Special Investigator, Ken Nash, Fifty dollars ($50.00) to perform a final inspection of the roof. On March 31, 1993, Ken Nash performed a final inspection of the roof and the roof passed inspection. The Customers paid Steve Wooten Thirty dollars ($30.00) to remove construction debris left on their property by the Respondent and to bring their property in compliance with the Notice of Violation issued on December 4, 1992.
Recommendation On the basis of all of the foregoing, it is RECOMMENDED that the Construction Industry Licensing Board issue a Final Order in this case to the following effect: Dismissing the charges alleged in Counts I, II, and IV of the Administrative Complaint; Concluding that the Respondent is guilty of the violation charged in Count III of the Administrative Complaint; and Imposing a penalty consisting of a fine in the amount of Two Hundred Fifty dollars ($250.00) for the violation charged in Count III of the Administrative Complaint. DONE AND ENTERED this 3rd day of May, 1995 in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 1995. COPIES FURNISHED: Diane Snell Perera, Esquire Department of Business and Professional Regulation 7300 North Kendall Drive, Suite 780 Miami, Florida 33156 Mr. Al C. Hufeld Post Office Box 681064 Orlando, Florida 32868-1064 Richard Hickok, Executive Director Construction Industry Licensing Board 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda Goodgame, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792
The Issue Whether disciplinary action should be taken against Respondent's license to practice contracting number RC 0054458, based on the violations of Section 489.129(1)(j), (k), (h), (p) and (m), F.S., alleged in the five count Administrative Complaint.
Findings Of Fact Since July 1968 and at all times material, Respondent Ronnie Boles, was licensed as a registered roofing contractor in the State of Florida, having been issued license number RC 0054458, and was registered to do business as "Ronnie Boles Roofing Company." On January 8, 1990 Ronnie Boles, doing business as Ronnie Boles Roofing and Construction, contracted with William C. Martin to construct two pole barns at 10550 N.W. 36th Lane, Gainesville, Alachua County, Florida. The contract price was $21,000.00. There is no evidence that "Ronnie Boles Roofing and Construction" was authorized through a valid contractor to construct pole barns. Respondent's roofing contractor license also did not permit the construction of pole barns. On January 12, 1990, Ms. Jean H. Martin, wife of William C. Martin, issued a personal check to the Respondent for $10,000 as partial payment on the January 8, 1990 contract. The Respondent delivered some materials to the site for use in the construction of the aforementioned pole barns, but never began construction. Mr. Martin attempted to have the Respondent construct the pole barns for over three months without success. The value of the materials provided by the Respondent was approximately $2,000.00, Mr. Martin attempted to have the Respondent refund the $8,000.00 balance of the money Ms. Martin previously paid Respondent on the uncompleted contract. Eventually, Mr. Martin retained attorney Ron Holmes who filed a civil suit against the Respondent based on the aforementioned contract. A judgment for Mr. Martin was obtained in the amount of $9,374.36 on October 1, 1991. Mr. Holmes has attempted to collect the judgment for Mr. Martin on several occasions without success. The Respondent has been actively uncooperative. As of the date of the formal administrative hearing, Respondent had paid no portion of the aforementioned judgment. Mr. Martin filed a complaint against the Respondent with the Department of Business and Professional Regulation. Tom Bishop, Department of Business and Professional Regulation Investigator, investigated the case and mailed the Respondent a notification letter on April 20, 1992. In addition, Mr. Bishop left two messages on the Respondent's answering machine. The Respondent did not respond to the notification letter or the phone messages left by Mr. Bishop. The Department of Business and Professional Regulation has accumulated $22.40 in initial investigative costs, $267.50 in investigative costs, and $605.90 in legal costs associated with prosecution of this cause as of the date of Petitioner's Proposed Recommended Order, totalling $895.80.
Recommendation Upon the foregoing findings of fact and conclusions of law, it is recommended that the Construction Industry Licensing Board enter a final order which provides as follows: Finds Respondent guilty of all violations as set out above. Requires Respondent to pay a collective fine of $5,000.00; Requires Respondent to pay restitution to Mr. Martin of $9,374.36; Requires Respondent to pay costs of investigation and legal fees in the amount of $895.80; and Suspends Respondent's license for three years, thereafter renewal of his license to be subject to proof of Respondent's compliance with requirements (2) - (4) inclusive. RECOMMENDED this 1st day of February, 1994, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The De Soto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 1st day of February, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-1497 The following constitute specific rulings, pursuant to S120.59(2), F.S., upon the parties' respective proposed findings of fact (PFOF). Petitioner's PFOF: 1 Rejected as unnecessary. 2-9 Accepted as modified to remove rhetoric and cumulative material. Respondent's PFOF: None Filed. COPIES FURNISHED: G. W. Harrell, Esquire Department of Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Ron Boles Route 2 Box 417 Alachua, Florida 32615 Richard Hickok, Executive Director Construction Industry Licensing 7960 Arlington Expressway Jacksonville, Florida 32211-7467 Jack McRay, Esquire Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792
The Issue Whether Respondent's license as a certified roofing contractor in the state of Florida should be revoked, suspended or otherwise disciplined under the facts and circumstances of this case.
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: At all times material to this proceeding, Respondent, Christopher G. Coxon, held a license as a certified roofing contractor, number CGC029604. On or about November 15, 1988, Respondent entered into a written contract with John DeCarlucci to repair a leak in the roof of DeCarlucci's residence at 1717 North Oregon Circle, Tampa, Florida. The contract amount was $400.00, of which Respondent was paid $200.00 by DeCarlucci on November 16, 1988. The Respondent gave DeCarlucci a one-year warranty on his work. The balance owed on the contract was to be paid upon satisfactory completion of the job. Respondent commenced work on the DeCarlucci residence on November 16, 1988. On November 16, 1988 Respondent removed two rows of roofing tile from DeCarlucci's roof while attempting to repair the leak in the roof. The Respondent carried these roofing tiles away from DeCarlucci's residence on November 16, 1988 and has never returned these roofing tiles or provided DeCarlucci with any replacement roofing tiles. On November 23, 1988 the area of the roof that Respondent had attempted to repair leaked. As a result of several telephone calls to Respondent from DeCarlucci, the Respondent returned to the job site on November 26, 1988 and December 7, 1988, and whatever repairs the Respondent attempted on those dates failed in that the roof continues to leak. After December 7, 1988 the Respondent did not return to the job site. DeCarlucci attempted to reach Respondent through the remainder of December 1988 and January and February 1989 by telephone and a certified letter but to no avail. As a result of DeCarlucci filing a complaint with the City of Tampa Building Department on January 5, 1989, the job site was inspected by the construction inspector for the building department and the project cited for violation of the building code. Respondent was notified of the complaint and building code violation. The Respondent was given until February 14, 1989 to correct the leakage and to replace the missing roofing tiles. As a result of Respondent's failure to take any corrective action toward repairing the roof or replacing the missing roofing tiles, the DeCarlucci complaint was filed with the City of Tampa Unified Construction Trades Board for disciplinary action. The Respondent subsequently returned the $200.00 to DeCarlucci that he had received from DeCarlucci on the contract price on November 16, 1988. In its complaint against the Respondent the City of Tampa Unified Construction Trades Board alleged that Respondent's failure to properly repair the roof was a violation of Section 101.1-Covering, Standard for the Installation to Roof Coverings, 1985, edition, Southern Building Code Congress International, Inc., and Section 25-101(5)(10) and (22) Grounds for Disciplinary Action, Penalties, City of Tampa, Building and Construction Regulations. Respondent was duly notified of the hearing to be held on April 4, 1989 on the allegations. At the hearing on April 4, 1989 the Respondent was found to have violated those sections set forth in Finding of Fact 13 and by unanimous decision the Board ordered Respondent to cease all construction activity and revoked the Respondent's permitting privilege. At no time material to this proceeding, has the Respondent made restitution to DeCarlucci for the missing roofing tiles or the cost of labor and materials for installing such tiles. While Section 489.129(1), Florida Statutes, provides for the assessment of costs associated with the investigation and prosecution of a case, there was no evidence presented by the Department as to the amount of those costs.
Recommendation Upon consideration of the foregoing findings of fact and conclusions of law and disciplinary guidelines set forth in Rule 21E-17.001, Florida Administrative Code, it is accordingly, RECOMMENDED: That the Board enter a Final Order finding Respondent, Christopher G. Coxon guilty of violation of Section 489.129(1)(d)(i) and (m), Florida Statutes, and for such violation revoke his license as a certified roofing contractor. DONE and ENTERED this 2nd day of January, 1992, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of January, 1992. APPENDIX The following constitutes my specific rulings pursuant to Section 120-59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties in the case. Rulings on Proposed Finding of Fact Submitted by the Petitioner Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed findings of fact: 4-6(1); 7-8(2); 9-10(3); 11(4); 13-16(5); 17-18(3); 19(6); 20-21(7); 22-23(8); 24-26(9); 27 28(10); 29-30(11); 31(12); 32(16); 33(13); 34(14); and 35- 36(15). Proposed findings of fact 1-3 are covered in the Preliminary Statement. Proposed finding of fact 12 is rejected as not being supported by competent substantial evidence in the record. See proposed findings of fact 20 and 21 and finding of fact 7. Rulings on Proposed Findings of Fact Submitted by the Respondent The Respondent did not submit any proposed findings of fact. COPIES FURNISHED: Craig M. Dickinson, Esquire Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Christopher Coxon 554 Carson Drive Tampa, FL 33615 Daniel O'Brien, Executive Director Construction Industry Licensing Board P.O. Box 2 Jacksonville, FL 32202 Jack McRay, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792