The Issue Whether Bay County has demonstrated its entitlement to the Permit?
Findings Of Fact The Ecologically Diverse Florida Panhandle With its high diversity of species and richness in endemic plants, the Florida Panhandle has been identified as one of six continental "biodiversity hot spots" north of Mexico. It has more species of frogs and snakes, for example, than any other equivalently-sized area in the United States and Canada and has botanical species that do not exist anywhere else in the Coastal Plain, one of the three floristic provinces of the North Atlantic American Region. The biodiversity stems from a number of factors. The Panhandle was not glaciated during the Pleistocene Period. Several major river systems that originate in the southern Appalachian Mountains terminate on the Panhandle's Gulf Coast. Its temperate climate includes relatively high rainfall. These factors promote or produce plentiful sources of surface and groundwater that encourage botanical and zoological life and, in turn, a diverse ecology. When compared to the rest of Florida, the Panhandle is relatively free from man-made impacts to its water resources. Until recently, the population growth rate lagged behind much of the state. Despite a rapid increase in the population in the late 1990s into the early part of the twenty-first century, it remains much less densely populated than areas in the I-4 Corridor and coastal peninsular Florida to the south. The Panhandle can be divided into physiographic areas of geological variation that are highly endemic; a substantial number of plant and animal species found in these areas are found nowhere else in the world. One of these areas is of central concern to this case. Located in southern Washington County and northern Bay County, it is known as the Sand Hill Lakes Area. The Sand Hill Lakes Area The Sand Hill Lakes Area (the "Area") is characterized by unusual geology that produces extraordinary ecological value. With few exceptions (see findings related to Dr. Keppner's flora and fauna inventories on the NTC/Knight Property below), the Area has not been extensively studied. The data on biological communities and water levels that exist, sparse as it is, has been obtained from historic aerials dating to 1941. The aerials are of some use in analyzing lakes and surface waters whose source is the Surficial Aquifer, but they are of limited value otherwise. They are not of use in determining the level in the Surficial Aquifer. Nor are they of assistance in determining river height when the banks of the river are covered by hardwood forest canopy. The resolution of the aerials is insufficient to show details of the various ecosystems. They do not show pitcher plants, for example, that exist at the site of hillside seepage bogs common in the Area. An aspect of the Area that the aerials do reveal is its many karst features on the surface of the land. Karst lakes and sinkholes dominate the Area and are a component of its highly unusual geology which is part of a larger system: the Dougherty Karst Plain. The Dougherty Karst Plain is characterized by numerous karst features: springs, caverns, sinkhole lakes, and sinkholes. Sinkholes In Florida, there are three types of sinkholes: cover subsidence, cover collapse, and "rock" or "cavern" collapse. Of the three, cover subsidence sinkholes are the most common in the state. Cover subsidence sinkholes form as the result of processes that occur on the surface. A cover subsidence sinkhole is usually a shallow pan typically not more than a few feet deep. Found throughout Central and South Florida, they are the most common type of sinkholes in most of peninsular Florida. In contrast, the other two major types of sinkholes (cover collapse and cavern collapse) occur as the result of processes below the surface that cause collapse of surface materials into the substrata. Both types of "collapse" sinkholes are found in the Area, but cover collapse is the more common. Cavern collapse sinkholes are relatively rare. Typical of the Area, cover subsidence sinkholes are not found on the NTC/Knight Property. The NTC/Knight Property The majority of the NTC/Knight Property is in Washington County, but the property straddles the county line so that a smaller part of it is in northern Bay County. All of the NTC/Knight Property is within the Area. The District recognizes that the NTC/Knight Property contains natural resources of extraordinary quality as does the Area generally. Over the three years that preceded the hearing, Dr. Keppner, an NTC/Knight expert, conducted extensive inventories of the flora and fauna on NTC/Knight Property. Dr. Keppner's inventory showed the NTC/Knight Property supports more than 500 species of vascular plants (flora with a system of tubes within the stem, phloem, and the xylem that exchange materials between the roots and leaves) and 300 species of animals. Among them are at least 28 vascular plants and six animals listed as imperiled (threatened or endangered) by state or federal agencies. At least 22 of the imperiled species of vascular plants and eight of the imperiled species of animals are located within an area expected to be affected by the Wellfield for which Bay County seeks the permit modification. For example, at Big Blue Lake alone where impacts were predicted by NTC/Knight experts to take place, the following imperiled plant species are found: Smoothbark, St. John's Wort, Kral's Yelloweyed Grass, Quilwort Yelloweyed Grass, Threadleaf Sundew, Panhandle Meadowbeauty, and Crystal Lake Nailwort. In addition to the Keppner inventory, NTC/Knight commissioned other studies to determine the nature of the sinkholes and whether they are connected to the Floridan Aquifer. NTC/Knight's experts determined that the property contains cover collapse and a few cavern collapse sinkholes that connect to the Floridan Aquifer. Despite evidence to the contrary submitted by the District and Bay County, the NTC/Knight determinations are accepted as facts for a number of reasons, including the lineup of the sinkholes and sinkhole lakes along identified photo-lineaments and the distribution of them in patterns that are not random. A District study using a dye test, moreover, confirmed conduit flow exists in the Area just east of the NTC/Knight Property. With regard to the distribution of the sinkholes and sinkhole lakes on the NTC/Knight Property, Dr. Sam Upchurch used the term "String of Pearls" to describe multiple sinkholes that exist along the edges of several lakes on the property. When sinkholes closer to the center of a lake are clogged or plugged with sediment and debris, the lakes continue to leak around the plugs which causes new sinkholes to form along the edge of the plugs. Examples of the "String of Pearls" formation on the edges of existing lakes are found at White Western and Big Blue Lakes on the NTC/Knight Property and at Crystal Lake nearby in Washington County. The multiple sinkholes bordering the edge of Big Blue Lake are examples of cover collapse sinkholes that, in geological terms, are relatively young as evidenced by their steep sides. In a karst area such as the Area, there is preferential flow in the conduits because of the difference of efficiency of transmission of water flowing through a porous medium of rock compared to that flowing though a conduit. Absent pumping in the Wellfield, the underlying aquifers are relatively stable. If the requested pumping does not take place, it is likely the stability will remain for a substantial period of time. It is not known with precision what will happen in the long term to the karst environment should pumping occur at the Wellfield at the rate the District proposes. When pumping occurs, however, water in the Area affected by the Wellfield will move toward the Wellfield. "[A]s it does[,] you may get some turbulent flow or vorticity in the water." Tr. 1391, (emphasis supplied). At some point, a change in the potentiometric surface and loss of buoyancy will most likely occur. This leads to concerns for Dr. Upchurch from two perspectives: One . . . is that if there is a[n affected] sinkhole lake [on the surface,] it may induce downward flow . . . the other . . . is that if it breaks the plug it may either create a new sinkhole or create a substantial drop in the level of water in the lake . . . which drains periodically, not necessarily because of a wellfield, but because that plug breaks. Id. In the first instance, lake levels could be reduced significantly. In the second, a new sinkhole could be created or the water level could drop dramatically as occurred at Lake Jackson in Tallahassee. Sand Hill Lakes Wetlands The Area contains a number of wetland communities. These include hillside seepage bogs, steepheads, sphagnum bogs, littoral seepage slopes around certain Sand Hill Lakes, temporary ponds, and creeks and streams in forested wetlands. A number of these wetlands occur on the NTC/Knight Property within the zone of influence in the Surficial Aquifer predicted by NTC/Knight's experts employing a model known as the "HGL Model." The wetland systems on the NTC/Knight Property are diverse, by type, plant species composition, and richness. This remarkable diversity led the District to recognize that the NTC/Knight Property contains lakes of nearly pristine quality, interconnected karst features, and endemic steephead ravines, all of which are regionally significant resources of extraordinary quality. The Area's wetlands also include many streams, among them Pine Log Creek, the majority of which is located on the NTC/Knight Property. Significant recharge to the Floridan Aquifer occurs on NTC/Knight Property. To the west, north, and east of the NTC/Knight Property are major concentrations of Floridan Aquifer springs that are crucial to the quality and character of regional surface water systems, including the Choctawhatchee River, Holmes Creek, and Econfina Creek systems. All of these surficial systems are dependent on the groundwater resources of the Area. The Area's Hillside Seepage Bogs Hillside seepage bogs are marsh-like wetland usually located on gentle slopes of the sides of valleys. They form when the Surficial Aquifer intercepts the sloping landscape allowing water to seep onto the sloped surface. The plant communities in the bogs are dominated by a great number and variety of herbaceous plants that prefer full sun. Among them are carnivorous plants. These unusual plants include the Trumpet and White-Topped pitcher plants as well as other varieties of pitcher plants. Inundation or saturation for extended periods of time is necessary for pitcher plants and most of the rest of the plant communities found in the bogs to thrive and to fend off invasion by undesirable species. Hillside seepage bogs are valued because they are among the most species-rich communities in the world. A reduction in water levels in the bogs below the root zone of associated plants will kill the plant communities that live in them and pose a threat to the continued existence of the bogs. Hillside seepage bogs were once abundant in pre- settlement Florida, but their expanse has been greatly reduced. They are now estimated to only occupy between one and five percent of their original range. On NTC/Knight Property, they have been spared to a significant degree. Numerous hillside seepage bogs continue to exist on the NTC/Knight Property primarily along the margin of Botheration Creek and its tributaries. The Area's Steepheads Steepheads are unique wetland systems. Found around the globe, they are usually regarded as a rarity. More than 50 percent of the steepheads that exist in the world are in a narrow latitudinal band that extends from Santa Rosa County in the west to Leon County in the east, a major section of the Florida Panhandle. Steepheads occur in deep sandy soils where water originating in the Surficial Aquifer carries away sand and cuts into sandy soils. The seepage emerges as a "headwater" to create a stream that conveys the water from the steephead into a river, or in some rare circumstances, into a karst lake. Over time, flow of the seepage waters results in deep, amphitheater- shaped ravines with steep valley side walls. Steepheads are important to the ecologies of the areas in which they occur. They provide habitat for a number of Florida endemic animals and plants believed to be relics of once-abundant species. Water that emerges from a steephead is perennial. Because the steep slopes of the steephead have not been disturbed over a long period of time, the water remains at a relatively constant temperature, no matter the season. Sampling of aquatic invertebrates at the Russ Pond and Tiller Mill Steepheads on the NTC/Knight Property found 41 and 33 distinct taxa, respectively, to inhabit the steepheads. Among them were a number of long-lived taxa. Their presence is consistent with the hallmark of a steephead: perennial flow of water at a relatively constant temperature. Most of the known steepheads flow into streams or rivers. Between six and ten within the Area, however, flow into Sand Hill Lakes. They have no direct connection to any surface drainage basin, thereby adding to their uniqueness. The level in the Surficial Aquifer has a direct impact on where and to what extent seepage flows from the sidewalls of a steephead. The Area's Sphagnum Bogs Sphagnum moss grows in many locations within the landscape and requires moisture. Where there is a large amount of sphagnum moss, it can form a unique community known as a sphagnum bog that is capable of supporting unique plant and animal populations. In the Area, these sphagnum bogs form along the valley sidewalls of steephead ravines and are fed by Surficial Aquifer seepage from the sidewall of the ravine. These sphagnum bogs support unique plant and animal communities, including a salamander discovered by Dr. Means that is new to science and so far only known to exist in sphagnum bogs in the Florida Panhandle. The Area's Sinkhole Lakes and their Littoral Seepage Slopes Sand Hill Lakes are nutrient poor, or "oligotrophic," receiving most of their nutrient inputs through exchange with the plant and animal communities on the adjacent littoral shelves during periods of high water levels. Fluctuating water levels in the Sand Hill Lakes allow a littoral zone with many different micro-habitats. Areas closest to the lakes are inundated regularly, but higher areas of the littoral zone are generally dry and inundated only every ten or 20 years -- just often enough to prevent encroachment of trees. In a few instances, portions of the littoral zones are inundated by seepage from the Surficial Aquifer. Above the normal low water of the Sand Hill Lakes, the littoral shelf occurs along a low gradient. As the littoral shelf transitions into the lake bottom and toward the deeper parts of the lake, there is an inflection point, where the gradient of the lake bottom becomes much steeper than the littoral shelf. If lake water levels fall below that natural inflection point, gully erosion will occur. The flow of water will be changed along the littoral shelf from seepage sheet flow over a wide expanse to water flowing down gullies in a concentrated stream. This change in flow will result in a loss of area needed by certain seepage dependent plants and animals as well as increased sedimentation from erosion. Big Blue Lake is unique because it boasts the largest known littoral zone seepage area of any Sand Hill Lake. The seepage zone along Big Blue Lake supports a number of rare plant species, including the Thread-Leaf Sundew, Smoothed Barked St. Johns Wort, and Crystal Lake Nailwort. The Area's Temporary Ponds Temporary ponds are small isolated water bodies that generally have no surface water inlet or outlet. Typically very shallow, they are sometimes wet and sometimes dry. Temporary ponds can range from basins that have continuous water for three to five years, to basins that have standing water for a month or two, every two to four years. These conditions limit their occupation by fish and, therefore, provide ideal conditions for amphibian reproduction which only occurs when water levels are maintained long enough to complete a reproductive cycle. In the Area, temporary ponds are a direct expression of the Surficial Aquifer and contain no known restrictive layer that might cause water to be "perched" above the Surficial Aquifer. Temporary ponds are critical to the viability of amphibian populations and support high amphibian biodiversity. A given pond can contain between five and eight species of salamander, and between 12 and 15 species of frogs. There has been a decline recently in the population of frogs and other amphibians that depend upon temporary ponds. The decline is due in part to ditching and other anthropogenic activities that have altered the hydrology of temporary ponds. Temporary ponds have a higher likelihood of being harmed by a drawdown than larger, connected wetlands systems. Lowered Surficial Aquifer water levels would lower water levels in temporary ponds and, thereby, threaten amphibian reproduction. Creeks/Streams in Forested Wetlands Streams are classified on the basis of the consistency of flowing water, including perennial (always flowing), intermittent (flowing part of the year), and ephemeral (flowing only occasionally during rain events). The type of stream flow is important because movement of water is essential to support aquatic systems in stream habitats. The NTC/Knight Property includes a number of stream systems, including Botheration Creek and Pine Log Creek. Botheration Creek is fed by groundwater discharge and originates, in large part, on the NTC/Knight Property. Botheration Creek flows from east to west until it intersects Pine Log Creek on the southwest part of the NTC/Knight Property. Botheration Creek provides Pine Log Creek with approximately 89 percent of Pine Log Creek's flow. From the confluence, Pine Log Creek flows south and west into the Pine Log State Forest and eventually joins the Choctawhatchee River. Botheration Creek contains high quality water and a diverse mix of aquatic invertebrates and fish. Sampling at a stage recorder located approximately two miles west of the eastern boundary of the NTC/Knight Property ("BCS-01") identified 46 taxa of macroinvertebrates, including six long- lived taxa, and mussels. The water level in Botheration Creek at BCS-01 was measured to be between 0.1 and 0.32 feet by four measurements taken from October 2010 to July 2011. Nonetheless, the presence of long-lived taxa and mussels indicates that, at BCS-01, Botheration Creek is a perennial stream. Carbon export from streams provides nutrients that feed the stream system. Headwater streams like Botheration Creek and its tributaries are essential to carbon export. For carbon export to occur, a stream must have out-of-bank flood events regularly to promote nutrient exchange with the flood plain. Bay County and its Water Supply Prior to 1961, the County obtained its public water supply from wellfields located near downtown Panama City. The wellfields drew from the Floridan Aquifer. An assessment of the pre-1961 groundwater pumping appears in a District Water Supply Assessment released in June 1998. In summary, it found that near Panama City, the potentiometric surface was substantially depressed by the pumping. Due to the threat of saltwater intrusion, the Deer Point Lake Reservoir (the "Reservoir") was constructed as an alternate water supply. A local paper mill, the city of Panama City, and Tyndall Air Force Base, all began to obtain public supply water from the Reservoir. Six years after the construction of the Reservoir, the Floridan Aquifer's water levels had rebounded to pre-pumping levels. See NTC/Knight Ex. 93 at 69. The authorization for the Reservoir began in the 1950's when the Florida Legislature passed a series of laws that granted Bay County authority to create a saltwater barrier dam in North Bay, an arm of the St. Andrews Bay saltwater estuary. The laws also allowed Panama City to develop and operate a surface freshwater reservoir to supply water for public use. The Deer Point Lake Dam (the "Dam") was built in 1961 from metal sheet piling installed across a portion of North Bay. The Dam created the Reservoir. The watershed of the Reservoir includes portions of Jackson, Calhoun, Washington, and Bay Counties and covers approximately 438 square miles. The Reservoir receives freshwater inflow from several tributaries, including Econfina Creek, Big Cedar Creek, Bear Creek/Little Bear Creek, and Bayou George Creek, totaling about 900 cubic feet per second ("cfs") or approximately 582 MGD. The volume of inflow would increase substantially, at least two-fold, during a 100-year storm event. The Dam is made of concrete and steel. Above it is a bridge and two-lane county road roughly 11.5 feet above sea level. The bridge is tied to the Dam by pylons. The top of the Dam is 4.5 feet above sea level, leaving a distance between the Dam and the bridge bottom of about seven feet. There is an additional structure above the Dam that contains gates, which swing open from the force of water on the Reservoir's side of the Dam. Capable of releasing approximately 550 MGD of freshwater into the saltwater bay, the gates keep the level of the Reservoir at about five feet above sea level. The height of the Dam and the gate structure leaves a gap between the bottom of the bridge deck and the top of the structure of "somewhere between 12 and 14 inches, a little better than a foot." Tr. 140. If storm surge from the Gulf of Mexico and St. Andrew's Bay were to top the Dam and the gate structure, the gap would allow saltwater to enter the Reservoir. The gates and the Dam structure are not designed to address storm surge. The Dam is approximately four feet thick and roughly 1,450 feet long. The 12-to-14 inch gap extends across the length of the Dam. With normal reservoir levels, the volume of water it contains is approximately 32,000-acre-feet or roughly 10.4 billion gallons. Bay County needs to drawdown the lake level for fish and wildlife purposes, the control of aquatic growth, and weed control. In winter, FWS prescribes a 45-day period of time to draw down the lake to expose the banks to kill vegetation. The last time the lake was drawn down by the County, the water level dropped approximately three feet, from five feet above sea level to two feet above sea level. This process took approximately six days and 16 hours, or approximately 53 hours/foot. Repair of the Dam and its Maintenance The Dam has been repaired three times. The last repair was following Hurricane Opal which hit the Florida Panhandle in the fall of 1995. During Hurricane Opal, "saltwater . . . entered . . . the [R]eservoir . . . [t]hat took 20-some days to flush out . . . ." Tr. 135. No evidence was presented regarding the Dam's vulnerability from the perspective of structural integrity during normal or emergency conditions. Other than the inference drawn from Mr. Lackemacher's testimony that Hurricane Opal damaged the Dam in 1995, no evidence was presented to suggest that the Dam's structure is vulnerable to damage caused by a storm surge, wave effect or other conditions caused by a storm of any magnitude. After the last of the three repairs, Bay County implemented a detailed maintenance program. Based upon the latest inspection reports, the Dam is in good condition and structurally sound. No work other than routine inspection and maintenance is currently planned. The 1991 Agreement and the WTP Bay County's current withdrawal of water from the Reservoir is based on a 1991 agreement between Bay County and the District (the "1991 Agreement"). See Joint Ex. Vol. II, Tab K. The 1991 Agreement allows Bay County after the year 2010 to withdraw 98 MGD (annual average) with a maximum daily withdrawal of 107 MGD. The 1991 Agreement, still in effect, authorizes Bay County to withdraw enough water from the Reservoir to meet its needs through 2040. Water for public supply is withdrawn from the Reservoir by a water utility pump station (the "Pump Station") located a short distance from the Dam in Williams Bayou. The water is piped to the water utility's treatment plant (the "Water Treatment Plant") five miles away. The Water Treatment Plant treats 60 MGD. Following treatment, the water is distributed to Bay County's wholesale and retail customers. The Reservoir water available to Bay County utilities is more than adequate to fulfill the water consumption demands of Bay County's system through a 20-year permit horizon. The transmission line between the Pump Station and the Water Treatment Plant has fittings that were designed to allow transmission of groundwater withdrawn from groundwater wells to be located along the transmission line to the Water Treatment Plant to provide a backup supply for the Reservoir. Bay County's Current Use of Potable Water The amount of water consumed by Bay County utility customers has declined over the last five years. Bay County's current use of water, based upon the average of the 13 months prior to the hearing, was 24.5 MGD, an amount that is only 25 percent of the water allocation authorized by the 1991 Agreement. There are approximately 560,000 linear feet of main transmission lines in Bay County with small service lines accounting for another several hundred thousand linear feet. Bay County furnishes water directly to approximately 6,000 retail customers in areas known as North Bay, Bay County, and the former Cedar Grove area, which is now part of Bay County. Wholesale customers include Panama City Beach, Panama City, Mexico Beach, Callaway, Parker, Springfield, and parts of Lynn Haven. The County also furnishes potable water to Tyndall Air Force Base. Lynn Haven does have some water supply wells; however, Bay County still supplements this water supply by approximately 30 percent. No other cities serviced by Bay County produce their own water. Bay County has a population of approximately 165,000- 170,000 permanent residents, which includes residents of the cities. The Bay County area experiences seasonal tourism. From spring break to July 4th, the population can grow to more than 300,000. The users of Bay County's drinking water supplies include hospitals, Tyndall Air Force Base, and the Naval Support Activity of Panama City ("NSA"). The County has 178 doctor's offices, 56 dental offices, 29 schools, 21 fire departments, 12 walk-in-clinics, six nursing and rehabilitation homes, six major employers, three colleges and universities, and two major hospitals, all which are provided drinking water by Bay County. Panama City Beach is the community which has the highest water use. Panama City Beach's average daily use is approximately 12 MGD. The peak day of usage for all of Bay County's customers over the 13 months prior to the hearing was 40 MGD. Bay County sells water to community water utility systems referred to as a "consecutive system." They include Panama City Beach, Panama City, and Mexico Beach. Bay County's request for 30 MGD contemplates provision of water for all essential and non-essential water uses occurring within the consecutive system. Bay County and the consecutive systems are subject to the District's regulations regarding emergency water use restrictions which typically restrict the non-essential use of water during water shortage emergencies. Hurricanes, Train Wrecks, and Post-9/11 America At the District's recommendation, Bay County has been considering a backup potable water source since the mid-1980's. Bay County's main concern is that it has inadequate alternatives to the Reservoir should it be contaminated. Contamination to date has been minimal. In the period of time after the 1961 creation of the Reservoir to the present, the Dam and the Reservoir have suffered no major damage or impacts from a tropical storm. No tropical storm since 1961 has disrupted Bay County's ability to provide potable water. Even Hurricane Opal in 1995 did not disrupt the water supply. Recent hurricane activity in the Gulf of Mexico, however, has aroused the County's fears. Should a storm of sufficient magnitude make landfall in proximity to the Dam, there is potential for saltwater contamination of the Reservoir from storm surge or loss of impounded freshwater due to damage to the Dam. Mr. Lackemacher, assistant director of the Bay County Utility Department and manager of the water and wastewater divisions of the department, has experience with other hurricanes in Palm Beach, Florida, and Hurricane Hugo in Myrtle Beach, South Carolina, during which water utilities suffered disruption of their distribution systems. The experience bolsters his concern about the damage a storm could cause Bay County's source of public water supply. Bay County's intake structure at Williams Bayou is approximately one mile away from the Dam. The location of the Pump Station puts it at risk for damage from a strong storm or hurricane. There is a rail line near the Reservoir. It runs along Highway 231 and over creeks that flow into the Reservoir, including the Econfina Creek. The rail line is known as "Bayline." Bayline's most frequent customers are the paper mill and the Port of Panama City. Not a passenger line, Bayline is used for the transport of industrial and chemical supplies. In 1978, a train derailment occurred on tracks adjacent to creeks that feed the Reservoir. The derailment led to a chlorine gas leak into the atmosphere. There was no proof offered at hearing of contamination of the Reservoir. There has never been a spill that resulted in a hazardous chemical or pollutant being introduced into the Reservoir. Bay County has not imposed restrictions on the type of vehicles that are allowed to use, or the material that may pass over, the county road on the bridge above the Dam. Nonetheless, in addition to saltwater contamination, Bay County also bases the need for an alternative water source on the possibility of a discharge into the Reservoir of toxic substances from a future train derailment. Bay County is also concerned about contamination of the Reservoir from a terrorist attack. In short, Bay County is concerned about "anything that could affect the water quality and water in Deer Point Lake." Tr. 184. The concerns led Bay County to file its application for the Wellfield on lands currently owned by the St. Joe Company. Consisting of ten wells spaced over an area of approximately ten square miles, the Wellfield would have a capacity of 30 MGD. Bay County's application was preceded by the development of the District's Region III Regional Water Supply Plan and efforts to acquire funding. Funding for the Wellfield and the Region III Regional Water Supply Plan Shortly after the commencement of the planning for the Wellfield, the District, in May 2007, authorized the use of funds from the State's Water Protection and Sustainability Trust Fund ("WPSTF"). The WPSTF is intended for development of alternative water supplies. In cooperation with the District, Bay County began drilling a test well followed by analyses to evaluate the water for potable suitability. In October of the same year, the District passed a resolution to request the Department of Environmental Protection to release $500,000 from the WPSTF to the District for local utilities in Bay and Escambia Counties for "Water Resource Development." NTC/Knight Ex. 195, p. 2. The amount was to be used "to provide funding for implementation of alternative water supply development and water resource developments projects pursuant to sections 403.890 and 373.1961, F.S." Id., p. 1. In February 2008, the District began a process to develop a regional water supply plan for Bay County. If the Wellfield were designated in the applicable regional water supply plan as "nontraditional for a water supply planning region," then it would meet the definition of "alternative water supplies" found in section 373.019(1), Florida Statutes. "In evaluating an application for consumptive use of water which proposes the use of an alternative water supply project as described in the regional water supply plan," the District is mandated "to presume that the alternative water supply is consistent with the public interest " § 373.223(5). Whether the Wellfield is to be presumed to be in the public interest depends on whether the application proposes the use of an alternative water supply project as described in the District's Region III Water (Bay County) Water Supply Plan adopted in 2008. The 2008 RWSP Pursuant to the process commenced in February, the District in August 2008 produced the Region III (Bay County) Regional Water Supply Plan (the "2008 RWSP"). In a section entitled "Identification of Alternative Water Supply Development Projects," the 2008 RWSP provides the following: "All of the water supply development projects identified in Table 4 are interrelated and considered alternative, nontraditional water supply development projects." NTC/Knight Ex. 187 at 14. Table 4 of the 2008 RWSP does not specifically identify the Wellfield. It identifies three projects in general terms. The first of the three (the only one that arguably covers the Wellfield) shows "Bay County Utilities" as the sole entity under the heading "Responsible Entities." Id. at 13. The project is: "Inland Ground Water Source Development and Water Supply Source Protection." Id. Under the heading, "Purpose/Objective," the Table states for the first project, "Develop inland alternative water supply sources to meet future demands and abate risks of salt water intrusion and extreme drought." Id. The Table shows "Estimated Quantity (MGD)" to be "10.0." Id. (In July 2008, the District's executive director informed Bay County that the Wellfield could produce 10 MGD.) The "Time Frame" is listed as 2008-12, and the "Estimated Funding" is "$5,200,000 WPSPTF" and "$7,800,000 Local, NWFWMD." Id. While not specifically identified in the 2008 RWSP, Table 4's project description supports a finding that the Wellfield is, in fact, one of the inland alternative water supply sources. The 2008 RWSP, therefore, designates the Wellfield as a "nontraditional" water supply source for Region III.4/ (The Wellfield also, therefore, meets the definition of "[a]lternative water supplies" in section 373.019(1). The demonstration of a prima facie case by Bay County and the District, however, make the applicability of the presumption a moot point. See Conclusions of Law, below.) Water Supply Assessments and Re-evaluations Development of a regional water supply plan by the governing board of each water management district is mandated "where [the governing board] determines that existing and reasonably anticipated sources of water are not adequate to supply water for all existing and future reasonable-beneficial uses and to sustain the water resources and related natural systems for the planning period." § 373.709(1), Fla. Stat. (the "Regional Water Supply Planning Statute"). The District determined in its 1998 District Water Supply Assessment ("WSA") for Region III (Bay County) that the existing and reasonably anticipated water sources are adequate to meet the requirements of existing legal users and reasonably anticipated future water supply needs of the region through the year 2020, while sustaining the water resource and related natural systems. See NTC/Knight 93 at 79. In 2003, Ron Bartel, the director of the District's Resource Management Division, issued a memorandum to the Governing Board (the "2003 Re-evaluation Memorandum"), the subject of which is "Regional Water Supply Planning Re- evaluation." NTC/Knight 95 (page stamped 42). The 2003 Re-evaluation Memorandum sets out the following with regard to when a "water supply plan" is needed: The primary test we have used for making a determination that a water supply plan was "not needed" for each region is that projected consumptive use demands for water from major water users do not exceed water available from traditional sources without having adverse impacts on water resources and related natural systems. Similarly, regional water supply planning is initiated "where it is determined that sources of water are not adequate for the planning period (20) years to supply water for all existing and reasonable-beneficial uses and to sustain the water resources and related natural systems." Id. With regard to the need for a Water Supply Plan for Bay County the 2003 Re-evaluation Memorandum states: [I]n Bay County (Region III), sufficient quantities have been allocated for surface water withdrawal from Deer Point Lake Reservoir through the District's consumptive use permitting program extending through the year 2040. In this area, the District is also scheduled to complete a minimum flow and level determination for the lake by the year 2006. This determination will be useful for deciding if additional water supply planning is needed before the permit expires in 2040. Id. (page stamped 43). The 2008 RWSP's designation of the Wellfield is justified in the minutes of the Governing Board meeting at which the 2008 RWSP's approval took place: While the reservoir has largely replaced the use of coastal public supply wells historically impacted by saltwater intrusion, there remain challenges within the region that make development and implementation of a Regional Water Supply Plan (RWSP) appropriate. Development of alternative water supplies would diversify public supply sources and help drought-proof the region through establishment of facility interconnections. Development of alternative supplies would also minimize vulnerability associated with salt water potentially flowing into the reservoir during major hurricane events. Id., p. 3 of 4. The adoption of the 2008 RWSP was followed in December 2008 by the District's 2008 Water Supply Assessment Update. The update is consistent with the earlier determinations of the adequacy of the Reservoir as a water supply source for the foreseeable future (in the case of the update, through 2030). The update also voices the concern about water quality impacts from storm surge. The update concludes with the following: In Region III, the existing and reasonably anticipated surface water resources are adequate to meet the requirements of existing and reasonably anticipated future average demands and demands for a 1-in-10 year drought through 2030, while sustaining water resources and related natural systems. However, the major concern for potential water quality impacts is that resulting from hurricane storm surge. A Regional Water Supply Plan (NWFWMD 2008) has recently been prepared for Region III to address concerns associated with existing surface water systems. NTC/Knight Ex. 101, p. 3-41. The Parties Washington County is a political subdivision of the State of Florida. Washington County is located directly north of Bay County and the Wellfield and within one mile of some of the proposed wells. Washington County includes thousands of wetlands and open water systems. Because of the hydro-geologic system in the area of the Wellfield, if there are wetland, Surficial Aquifer, and surface water impacts from the withdrawal under the Permit, it is likely that impacts will occur in Washington County. Washington County has a substantial interest in protection, preservation, and conservation of its natural resources, including lakes, springs, and wetlands, and the flora and fauna that depend on these water resources, especially endangered flora and fauna. Washington County has a substantial interest in the protection of all water resources in Washington County because of the close relationship between surface waters, groundwater, and the potable water supply used by Washington County residents. NTC/Knight is the owner of approximately 55,000 acres of land located in northern Bay County and southern Washington County. The NTC/Knight Property includes thousands of acres of wetlands and open waters, including Sand Hill Lakes, steepheads, hillside seepage bogs, sphagnum bogs, littoral seepage slopes around certain Sand Hill Lakes, temporary ponds, and forested wetlands. A large portion of the NTC/Knight Property is directly adjacent to the Wellfield and within the HGL Model projected drawdown contour. Based on the projected amount of drawdown from pumping at the proposed average rate of 5 MGD, the 0.5 projected drawdown contour predicted by the HGL Modeling Report (see Finding of Fact 121, below) extends over thousands of acres of the property. NTC/Knight has a substantial interest in the protection of the surface and groundwater directly on, under, and adjacent to its property. The water supports the numerous ecosystems of extraordinary value located on the property. James Murfee and Lee Lapensohn are individuals, who reside in Bay County on property fronting on and beneath Tank Pond approximately five miles from the Wellfield. Petitioners Murfee and Lapensohn have a well which extends into the Intermediate Aquifer. The Murfee and Lapensohn properties are within the HGL Model projected drawdown contour. Petitioners Murfee and Lapensohn have a substantial interest in the protection of their drinking water supply well and the surface waters directly on and adjacent to their properties. Bay County, the applicant, is a political subdivision of the State of Florida. The District is a water management district created by section 373.069(1). It has the responsibility to conserve, protect, manage, and control the water resources within its geographic boundaries. See § 373.069(2)(a), Fla. Stat. Section 120.569(2)(p), Florida Statutes Section 120.569(2)(p), in pertinent part, provides: For any proceeding arising under chapter 373, chapter 378, or chapter 403, if a nonapplicant petitions as a third party to challenge an agency’s issuance of a license, permit, or conceptual approval, the order of presentation in the proceeding is for the permit applicant to present a prima facie case demonstrating entitlement to the license, permit, or conceptual approval, followed by the agency. This demonstration may be made by entering into evidence the application and relevant material submitted to the agency in support of the application, and the agency’s staff report or notice of intent to approve the permit, license, or conceptual approval. Subsequent to the presentation of the applicant’s prima facie case and any direct evidence submitted by the agency, the petitioner initiating the action challenging the issuance of the license, permit, or conceptual approval has the burden of ultimate persuasion and has the burden of going forward to prove the case in opposition to the license, permit, or conceptual approval through the presentation of competent and substantial evidence. The permit applicant and agency may on rebuttal present any evidence relevant to demonstrating that the application meets the conditions for issuance. Paragraph (p) was added to section 120.569(2) in the 2011 Session of the Florida Legislature. Accordingly, the final hearing commenced with the Bay County and the District's presentation of its prima facie case by submitting the application, supporting documentation, and the District's approval of the application. Respondents also presented the testimony of four witnesses in the hearing's first phase. Phase I of the Final Hearing: Bay County's Application, Supporting Documents, the District's Approval and Supporting Testimony The Application File At the final hearing, Bay County and the District offered the "application file," marked as Joint Exhibit Binder Volumes I-IV (the "Application File") in the hearing's first phase. It was admitted into evidence. A document entitled "Alternate Water Supply Report - Bay County Water Division" dated May 20, 2008 (the "Hatch Mott MacDonald Report") is contained in the Application File. See Joint Ex. Vol. I, Tab B. The Hatch Mott MacDonald Report is a preliminary evaluation of a wellfield with 22 wells, an "initial phase . . . [of] five (5) wells producing 5 MGD and the final phase . . . [of] 17 wells, producing 25 MGD." Id. at 1. The evaluation includes the gathering of information, a recommendation for the best method of treatment, an analysis of whether individual well sites or a centralized site would be superior, a hydraulic model and analysis, and the potential construction and operation costs. The report concludes in its Executive Summary: HMM's preliminary results, based upon water analysis of Well No. 1, indicate that only disinfection will be required for potable water treatment. Additionally, the hydraulic analysis indicated that the wells are capable of providing the initial 5 MGD and future 25 MGD to the proposed connection point along Highway 388 without re-pumping. Adequate storage for fire protection should be considered at current and future service areas. The use of chlorine gas at each well site during the initial phase had the lowest present worth of $16,770,270; that is, the smallest amount of funds needed today to build, operate, and maintain the system. The use of chlorine gas at each well in the final phase had a present worth of $41,245,118, only slightly more than the present worth of $40,834,245 for on-site Id. generation of disinfectant at three (3) central facilities. The Application File contains a response to a District request for additional information (the "2009 RAI Response") submitted by the Bay County Services Utility Director and received by the District in September 2009. See Joint Ex. Vol. II, Tab K. The 2009 RAI Response contains the 1991 Agreement and numerous other documents. Among them is a report prepared by HydroGeoLogic, Inc. ("HGL") entitled "Groundwater Model Development for the Assessment of a New Wellfield in Bay County, Florida" dated September 2009 (the "2009 HGL Modeling Report"). The report predicts impacts that would be created to the surrounding aquifers as a result of the Wellfield pumping, but recommends that additional data be obtained. The Application File contains the District's Notice dated March 25, 2010. See Joint Ex. Vol. III, Tab B. Attached to the Notice is a draft of the Permit and a staff report from the District recommending approval with conditions. Condition 11 of the Permit's standard conditions obligates Bay County to mitigate any significant adverse impacts caused by withdrawals and reserves the right to the District to curtail permitted withdrawal rates "if the withdrawal causes significant adverse impact on the resource and legal uses of water, or adjacent land use, which existed at the time of the permit application." Joint Ex. Vol. III, Tab B, p. 3 of 17. Attachment A to the Permit requires conditions in addition to the standard conditions contained in the body of the Permit. Paragraph 12 of Attachment A, for example, requires that Bay County implement and maintain a water and conservation efficiency program with a number of goals. Attachment B to the Permit requires a monitoring and evaluation program and wetland monitoring of adjacent properties to determine if the pumping causes adverse impacts to wetland areas, including habitat and species utilization. The Application File contains a revised modeling report also entitled "Groundwater Model Development for the Assessment of a New Wellfield in Bay County, Florida" (the "2011 Revised HGL Modeling Report" or the "HGL Model Report"). See Joint Ex. Vol. III, Tab P. The 2011 Revised HGL Modeling Report predicts impacts of the pumping of the Wellfield on the Upper Floridan Aquifer and the Surficial Aquifer. The HGL Model is based on an adaptation of an original model first developed by the U.S. Geological Survey (USGS) and then further adapted by HGL. The adapted model is known as MODFLOW-SURFACT. The MODFLOW-SURFACT Model has been used in excess of 600 applications and is used worldwide. The HGL Model predicted impact from pumping when wellfield pumping achieves a "steady state." Steady state impact is achieved after 10-12 years of constant pumping. The impact and the area of impact is depicted on Figure 5.1b(1) of the 2011 Revised HGL Modeling Report. The predicted drawdown of the Surficial Aquifer is predicted to be six inches (0.5 ft) within the areas indicated. The Application File shows that the permit was revised twice. Ultimately, a Second Revised Notice of Proposed Agency Action dated July 22, 2011, was issued by the District. Attached to the Second Revised NOPAA is the District's Permit. See Joint Ex. Vol. IV, Tab U. A revised Staff Report from the District dated July 18, 2011, is also included in Volume IV of the joint exhibits. See id., Tab Q. The Permit as supported by the staff report allows an average daily withdrawal of 5 MGD, a maximum daily withdrawal of 30 MGD for no more than 60 days per year (with a maximum of 52 consecutive days), and a maximum monthly amount of 775 million gallons. See Joint Ex. Vol. IV, Tab U. The Permit also includes the LTEMP jointly prepared by the Applicant and the District. See id., Attachment B. The Permit requires Bay County to "mitigate any significant adverse impact caused by withdrawals . . . on the resource and legal water withdrawals and uses, and on adjacent land use, which existed at the time of the permit application." Joint Ex. Vol. IV, Tab R, p. 3 of 11. If the District receives notice of an impact from the existing legal user, it contacts the utility. "Within 72 hours [the utility has] a well contractor out there and they have determined what the problem is." Tr. 615. There are no time requirements for the resolution of the impact or any other resolution procedures in the Permit. Definitions of Emergency and Maintenance Amounts The Permit does not include a definition of when the Reservoir may be considered to be unavailable as a public water supply. That determination is left to Bay County. The Permit does not set a withdrawal limit lower than the limits detailed above for maintenance of the Wellfield. There is one set of withdrawal limits. They apply irrespective of the purpose of the withdrawals, that is, whether for backup in an emergency, maintenance, or some other purpose that falls under Public Supply or Industrial Use. Conditions and Monitoring Requirements Bay County is required to mitigate any significant adverse impacts on resources and legal water withdrawals and uses caused by the County's withdrawal from the Wellfield. In addition, the District reserves the right to curtail permitted withdrawal rates if Bay County's withdrawal causes adverse impacts on local resources and legal uses of water in existence at the time of the permit application. In the event of a declared water shortage, the Permit requires Bay County to make water withdrawal reductions ordered by the District. In addition, the District may alter, modify, or deactivate all or parts of the Permit. Attachment A to the Permit, states: The Permittee shall not exceed total, combined groundwater and surface water (authorized in Individual Water Use Permit No. 19910142) withdrawals of an average daily withdrawal of 98,000,000 gallons, a maximum daily withdrawal of 107,000,000 gallons and a maximum monthly withdrawal of 2,487,750,000 gallons. Joint Ex. Vol. IV, Tab U, p. 4 of 11. The inclusion of "surface water" in the condition covers withdrawals from the Reservoir. The combination of actual withdrawals from the Wellfield and actual withdrawals from the Reservoir, therefore, means that Bay County may not exceed the limitations of the withdrawals authorized by the 1991 Agreement. Attachment A to the Permit further explains how Bay County must mitigate harm caused by groundwater withdrawals. The Permittee, within seven days of determination or notification by the District that the authorized groundwater withdrawal is causing harm to the resources, shall cease or reduce, as directed by the District, its pumping activity. The Permittee shall retain the services of a qualified, licensed professional to investigate allegations of interference with an existing, legal groundwater use. The Permittee shall ensure their chosen contractor investigates the alleged interference within 72 hours of the allegation being made. If it is determined that the use of a well has been impaired as a result of the Permittee's operation, the Permittee shall undertake the required mitigation or some other arrangement mutually agreeable to the Permittee and the affected party. The Permittee shall be responsible for the payment of services rendered by the licensed water well contractor and/or professional geologist. The Permittee, within 30 days of any allegation of interference, shall submit a report to the District including the date of the allegation, the name and contact information of the party making the allegation, the result of the investigation made and any mitigation action undertaken. Joint Ex. Vol. IV, Tab U, Attachment A, p. 4 of 11. Bay County is also required, within two years from the Permit's issuance, to submit to the District for review and approval a contingency plan to mitigate potential impacts. The County must wait one full year prior to commencing withdrawal of groundwater for production purposes. During the one-year period, the County must complete groundwater, surface water, and wetland monitoring. The requirements of the mandatory monitoring are found in Attachment B of the Permit, LTEMP. See Joint Ex. Vol. IV, Tab U, Attachment B. The LTEMP "is designed to track trends in ecological and hydrological conditions caused by naturally occurring fluctuations in rainfall, which may affect ground and surface water hydrologic conditions; and to identify potential effects caused by wellfield pumping." Joint Ex. Vol. IV, Tab U, Attachment B at 1. If a substantive deviation occurs from predictions made by the HGL Modeling, or if any other hydrologic or ecologic changes due to the withdrawals are observed at monitoring sites, the District is required to review and, in consultation with Bay County, appropriately revise the LTEMP as necessary with the aim that the monitoring will assure that the conditions for issuance of the Permit are being met. Testimony in Support of the Application In addition to the documentary evidence offered in the first phase of the proceeding, Bay County and the District presented the testimony of several witnesses. These witnesses testified as to background and the 2008 RWSP, the vulnerability of the Reservoir to saltwater contamination from storm surge, and the basis for the District's decision. Vulnerability to Storm Surge There is a one percent chance every year of a 100- year storm event. Flood Insurance Rates Maps ("FIRMS") show that the 100-year water level (the level of storm surge in a 100-year storm event) at the Dam will reach 11 feet NAVD, two feet above the top of the gate structure above the Dam. The Federal Emergency Management Agency ("FEMA") and the National Weather Service ("NWS") have developed the Sea, Lake, and Overland Surge from Hurricanes ("SLOSH") model, which estimates storm surge depths resulting from historical, hypothetical, or predicted hurricanes. A Florida Department of Emergency Management's SLOSH model of the Panama City area shows maximum surge levels for Storm Categories 1, 2, 3, 4, and 5, in NAVD feet as 3.3, 5.8, 10.8, 14.1, and 18.1, respectively. The SLOSH model, in all likelihood, is a low estimation. It is reasonable to expect surge levels in a Category 3 hurricane that passes directly over the Dam, for example, to be higher than 10.8 feet NAVD predicted by the SLOSH model at the Dam. According to the National Oceanic and Atmospheric Administration's ("NOAA") database, 43 tropical storms and hurricanes have passed within 200 miles of the Reservoir between 1970 and 2010 and 20 have come within 100 miles. None have made landfall closer than 40 miles away from the Dam. Of the 20 storms passing within 100 miles of the Reservoir, four have reached Category 3 strength or higher: Eloise, Elena, Opal, and Dennis. In 2004, Hurricane Ivan made landfall over 100 miles to the west of the Dam and raised water levels near the Dam to nearly five feet NAVD. The following year, Hurricane Dennis made landfall 76 miles to the west of the Dam. Dennis produced a surge level of nearly four feet NAVD near the Dam. "Hurricane Eloise (1975) made landfall 40 miles west of Panama City and produced water levels 15 ft above normal at Panama City ([citation omitted]). However, the storm passed through the area quickly and does not appear to have significantly affected the dam." Bay County Ex. 1, p. 3 of 9. Hurricane Opal made landfall 86 miles west of Panama City Beach and produced water levels of about 8.3 feet NAVD near the Dam. The storm surge did not overtop the gate structure above the Dam, but the gates were jammed by debris. "[C]hloride levels rose above 50 ppm at the intake pumps and two to three times above normal background levels of 8 to 10 ppm 'almost one mile up-reservoir.'" Id. The levels of chloride were "still well within drinking water limits," tr. 434, of 250 parts-per- million (ppm). Hurricane Katrina made landfall in 2005 more than 200 miles west of the Reservoir with storm surges higher than 20 feet. Katrina produced surge levels of five feet above normal tide levels in Bay County. The rate and amount of saltwater that would enter the Reservoir depends on the height of the storm surge above the Dam. The 100-year surge levels could remain above the top of the Dam for three or more hours. Such an event would introduce approximately 56,200,000 cubic feet or 1,290 acre-feet of saltwater into the Reservoir, even if the Dam were to remain intact (undamaged) and the tide gates remain closed. The salinity levels bay-side of the dam are generally 23,000 to 33,000 ppm. It is reasonable to expect that in the event of a 100-year storm event, much of the storm surge would come directly from the Gulf of Mexico, which has higher salinity levels. With the Dam intact, the introduction of 1,290 acre- feet of saltwater at 33,000 ppm would raise the average chloride concentration in the Reservoir to at least 800 ppm, more than three times the maximum drinking water chloride level of 250 ppm. Assuming the Dam remained intact during a 100-year storm event, freshwater added over time to the lake from the streams and aquifer will dilute the elevated lake chloride level and restore the lake water to a level fit for human consumption. The USGS has measured stream flow at Deer Point Lake and estimated the lake receives an average of 600 million gallons of freshwater per day or 900 cfs. Post-Opal rates were estimated at 1,500 cfs by the District. Given the estimated volume of saltwater introduced to the lake, at an inflow rate equal to the estimated post- hurricane freshwater inflow rate, Bay County's expert, Dr. Miller, estimated it would take at least two weeks to reduce salinity in the lake to drinkable levels. The inflow rate, however, is not certain. Dr. Miller estimated it is reasonable to expect that it could take anywhere from two weeks to two months for the lake to recover from the saltwater intrusion depending on the variation in the inflow rate. Nonetheless, Dr. Miller assumed that the saltwater from storm surge entering the Reservoir would mix in a uniform matter. There would be "quite a bit of mixing in a storm," tr. 485, of saltwater topping the Dam and freshwater in the Dam. But there would also be stratification due to the sinking of denser saltwater and the rising in the water column of freshwater. The above estimations assume the bridge and Dam remain intact during a major storm. The Dam and tide gates act as a solid barrier, protecting the lake from saltwater in the bay. If rainfall rises in the lake prior to a surge, the tide gates would open to release water, becoming vulnerable to damage or jamming by debris as occurred during Hurricane Opal. In the event of storm surge bringing saltwater into the Reservoir, the opening of the tide gates will assist the Reservoir in reaching chloride levels below 250 ppm provided the tide gates operate properly. Dr. Janicki, an NTC/Knight expert, used the Environmental Fluid Dynamics Code hydrodynamic model ("EFDC Model") to simulate the effects of control structures and water withdrawals on the Reservoir. Taking into consideration the factors Dr. Janicki considered relevant, he predicted that chloride levels, in the event of storm surge from a Category 3 hurricane overtopping the Dam, would only exceed 250 ppm, the drinking water standard, for approximately 3.4 days. Dr. Janicki's prediction, however, was flawed. He added too little saltwater to the lake in the event of contamination from storm surge. He assumed that saltwater would be flushed too soon from the Reservoir following contamination. He did not account for the effects of waves in his model. His model was not in accord with data for Hurricane Opal and the chloride levels near the Dam taken by Bay County after Opal. If the bridge and Dam were severely damaged, more saltwater could enter the lake. With severe damage to the Dam, the Reservoir would be exposed to normal tides. Restoration would not begin until the Dam and bridge had been fully repaired. If an event were catastrophic, the Reservoir could be offline for a lengthy period of time. The Basis for the District's Decision Bay County's reliance on the Reservoir for water for the majority of the population led the District in the mid-1980s to encourage the County to obtain a backup supply. After the District turned down several requests for withdrawals of up to 30 MGD for every day of the year, the District ultimately approved what is reflected in the Permit. The justification for the permitted withdrawal is as a backup supply in the event the Reservoir becomes unavailable and for maintenance of the system and recoupment of its cost. With regard to maintenance, the District attempted to obtain information from Bay County as to appropriate withdrawal limitations. The attempts were abandoned. Despite repeated requests by the District, Bay County did not provide the amount of water needed to be withdrawn for maintenance since it did not have "infrastructure specifics," tr. 552, needed to provide the District with a numeric limit. In contrast to the amount needed for maintenance, the District found Bay County to have demonstrated that it needs 30 MGD when the Reservoir is offline and that it is reasonable for the County to need 30 MGD up to 60 days per year. The District determined that the Bay County's application met the requirements for the issuance of a consumptive use permit found in section 373.221(1)(a)-(c). In determining whether approval of the application is in the public interest, the District did not presume that it is in the public interest on the basis of the designation in the 2008 RWSP of an inland groundwater source as an alternative water supply. The District determined that it is in the public's interest for Bay County to have a reliable and safe water supply source as a backup to the Reservoir irrespective of the statutory presumption. Nonetheless, the District maintains in this proceeding that the presumption applies. The District also applied the 18 criteria test for finding a reasonable-beneficial use found in Florida Administrative Code Rule 62-40.410(a)-(r) and determined that the application should be approved. Petitioners' Case in Opposition Washington County (Petitioner in Case No. 10-2983), NTC/Knight (Petitioner in Case No. 10-2984), and Messrs. Murfee and Lapensohn (Petitioners in Case No. 10-10100) filed individual petitions for formal administrative hearing. Although not identical, the petitions share the similarity that, in essence, each alleges that Bay County failed to establish that the proposed use of water meets the statutory and rule criteria for obtaining a permit for the consumptive use of water. For example, among the many issues listed under the heading "Disputed Issues of Material Fact and Law" in Washington County's Petition for Formal Administrative Hearing is "[w]hether Bay County has provided reasonable assurance that its proposed use of water is a reasonable-beneficial use as defined in section 373.019, Florida Statutes." See p. 5 of the Washington County petition. In like fashion, the Washington County petition and the other two petitions allege that the issues are whether Bay County provided reasonable assurance that it meets the other statutory criteria in section 373.223, and the applicable rule criteria that must be met by an applicant in order for the District to issue a permit for the consumptive use of water. The Petitioners' cases focused on five topics: 1) the limitations of the HGL Model; 2) the likelihood of impacts to wetlands and the failure of the monitoring plan to provide reasonable assurance that the District's monitoring under the plan will succeed in detecting harm to wetlands caused by the withdrawals; 3) the reasonable-beneficial nature of the proposed use of the permit, including the vulnerability of the Reservoir; 4) interference with presently existing legal users; and 5) the feasibility of alternative sources. Bay County and the District offered evidence on rebuttal to meet the Petitioners' cases. Surrebuttal was conducted by Petitioners. Modeling Groundwater models "represent what is happening in very complex physical systems." Tr. 1495. Typically, the data used by models is not sufficient to obtain a completely accurate representation. The models depend on specific data points such as information from boreholes or water level measurements that do not reveal everything that is occurring in the complex system and, therefore, are not enough to support completely accurate model predictions. As explained by Dr. Guvanasen, Bay County and the District's expert, in order to reach a representation of the entire system when the data available from boreholes and measurements is insufficient, which is typically the case, the modeler must "extrapolate a lot of information and use other knowledge of other events." Id. The "knowledge of other events" that the HGL Model used included Dr. Scott's knowledge of the karst environment in the Panhandle of Florida, the mapping of Bay and Washington County geology by the Florida Geological Society, and Dr. Upchurch's knowledge of karst topography. The HGL results of the available data and the extrapolations were placed into a mathematical model (the HGL Model) that considered the withdrawals at issue to determine the response of the system to the additional stress of the withdrawals. Mathematical models like the HGL Model lead to "non- unique solutions" in which "no model . . . is exactly 100 percent correct . . . ." Tr. 1635. Modeling results, therefore, are subject to changes as additional data is collected that demand a better representation than the model provided prior to the data's collection and analysis. HGL Modeling for this case provides examples of non- unique solutions. HGL "built a model twice . . . and got two different sets of answers." Tr. 1633. Besides the recommendation that more data be obtained after the first HGL Model results, the model was not satisfactorily calibrated and the model was recalibrated for the Revised HGL Modeling results. Mr. Davis, NTC/Knight's expert, conducted additional modeling work (the "Davis Modeling"). Using the HGL Model and additional data concerning the NTC/Knight Property, Mr. Davis found drawdowns would occur over a similar but greater area than shown in the 2011 Revised HGL Modeling Report. (Compare NTC/Knight Ex. 31 at 2 to Joint Ex. Vol. III, Tab P, Figure 51b(1).) The Davis Modeling drawdowns, moreover, ranged up to 0.8 feet, 60 percent more than the 0.5 feet determined by the second HGL Modeling results. In the area of Big Blue Lake, for example, the drawdown contours produced by the Davis Model were either 0.6 feet or 0.7 feet, 20 to 40 percent more than the 0.5 feet produced by the second HGL Modeling results. See NTC/Knight Ex. 31 at 2. Asked to rank the modeling results between the first HGL Model run, the second HGL Model run, and his own results, Mr. Davis was unable to say which was better because of the sparseness of the data. Mr. Davis opined that he could conduct another "dozen more model runs," but without additional data he would be "hard pressed" to be able to say which run was more accurate. Tr. 1633. In Mr. Davis' opinion there remain significant uncertainties that cannot be resolved without more data. Inadequate data "precludes . . . reasonable assurance as to exactly where the impacts will travel and exactly what the magnitude of those impacts will be . . . ." Tr. 1637. Ecological Impacts Bruce A. Pruitt, Ph.D., was accepted as an expert in hydrology, soil science, fluvial geomorphology, and wetland sciences. Dr. Pruitt mapped the soil types on the NTC/Knight Property using the Natural Resource Conservation Service ("NRCS") Web Soil Survey and tested soil types by hand-auguring in wetland areas. He characterized the various soil-types on the property by drainage class (relative wetness of the soil under natural conditions) and hydraulic conductivity (permeability). Dr. Pruitt ranked the vulnerability of wetlands within the zone of drawdown predicted by the HGL Model as "very high," "high," or "moderate." The categories were based on the presence of threatened and endangered species, Florida Natural Area Inventor ("FNAI") habitat designation, and the hydrology of the wetland. He assumed that if the water level in the Surficial Aquifer were to be drawn down by 0.3 feet or 0.4 feet then the water level in the seepage bogs at Botheration Creek would be drawn down by the same amount. Wetlands with a vulnerability classification of "very high" will suffer an adverse impact at a drawdown level of 0.2 feet; those at "high" at 0.3 feet and those at "moderate" at 0.5 feet in times of drought. Dr. Pruitt calculated wetland acreage by type using the Florida Cover Classification System. He assigned vulnerability rating for the wetlands within the Surficial Aquifer drawdown contours generated by the HGL Model. Based on Dr. Pruitt's calculations, a total of approximately 4,200 acres of wetlands are likely to be harmed by the predicted drawdown. A majority of these wetlands are located in Washington County. Based on Dr. Pruitt's analysis, it is likely that the NTC/Knight Property contains 1,981 acres of "very highly" vulnerable wetlands; 1,895 acres of "highly" vulnerable wetlands; and 390 acres of "moderately" vulnerable wetlands, which are likely to be harmed by the drawdown in times of drought. In reaching his opinion about the quantification of acres of wetlands likely to be harmed, Dr. Pruitt applied the Florida Uniform Mitigation Assessment Method ("UMAM"). UMAM was designed to address compensatory mitigation in dredge and fill cases. It was not designed for consumptive water use cases. In contrast and damaging to its case of reasonable assurance that natural systems will not be significantly affected, the District did not conduct an analysis to determine loss of wetland function resulting from operation under the Permit. Nor did it determine how much drawdown the affected wetlands could tolerate before they were harmed. Rather than conducting such an analysis, the District chose to rely on implementation of the LTEMP to cure any harm that might be down by drawdown to the Surficial Aquifer. The District and Bay County's wetland scientists opined that there might be a less permeable restrictive layer maintaining water levels above the Surficial Aquifer on the NTC/Knight Property. Dr. Pruitt acknowledged that the NTC/Knight Property had scattered clay layers beneath the surface. It is possible, therefore, that some of the wetland areas he identified as subject to harm have restrictive features under them which would hold water and resist dehydration. In his hand-auguring, however, Dr. Pruitt found no evidence of a less permeable layer. The auguring only went to a depth of three feet and would have to go to a depth of two meters to be definitive. Furthermore, Dr. Pruitt found no evidence of a less permeable layer from well drillings. The District and Bay County did not prove that there is, in fact, such a restrictive layer. NTC/Knight collected water-level data from shallow hand-augured wells and stage recorders at the Botheration Creek Hillside Seepage Bog. The data demonstrate that the water level in the shallow, hand-augured wells at the Botheration Creek Bog is a direct reflection of the level of the Surficial Aquifer. The Surficial Aquifer at the Botheration Creek Bog was approximately 95.5 feet NAVD, over 35 feet higher than at Big Blue Lake and the highest measured level south of Big Blue Lake. The Botheration Creek Hillside Seepage Bog is located between the 0.3 and 0.4 foot Surficial Aquifer drawdown contours predicted by the HGL Model. Based on the HGL Model, the District and Bay County's experts estimated the Surficial Aquifer drawdown at this bog would be 0.39 feet. During the approximately one year of NTC/Knight's water-level recording, a drawdown of 0.39 feet would have reduced the frequency and duration of inundation at this bog significantly. For example, an analysis of the approximately one year of data collected by NTC/Knight shows that at the intermediate water-level recorder location in the bog, one 29-day period of inundation would have been reduced to just nine days and that further down gradient in the bog, none of the five instances when the bog was inundated would have occurred. This is consistent with Dr. Pruitt's vulnerability assessment, which finds that the vulnerability of the hillside seepage bogs to drawdown is "very high," that is, these systems are likely to be harmed in times of drought at drawdown levels in the Surficial Aquifer of 0.2 feet or greater. A drawdown of 0.3-0.4 feet in the Surficial Aquifer at the hillside seepage bog along Botheration Creek increases the likelihood that the hillside seepage bogs along Botheration Creek will be lost in times of drought. The littoral shelves of Sand Hill Lakes typically occur along a low gradient above the normal low water level of the lakes. The existence of the shelf promotes seepage sheet flow along a wide expanse. The drawdown will change the flow from seepage sheet flow to concentrated stream flow within gullies. The erosion and increased sedimentation produced by the greater force of the water in the gullies will cause a loss of area needed by certain seepage dependent plants and animals. If Big Blue Lake were to be drawn down by the 0.71 feet predicted by Mr. Davis, the location of the seepage would move down 0.71 feet vertically and an estimated 24.5 feet horizontally. The result would be a reduction in the littoral shelf conducive to seepage-dependent plant communities by approximately nine acres. The impact would likely be significant since the seepage zone is in an area of "very high" vulnerability according to Dr. Pruitt. Between October 2010 and July 2011, NTC/Knight took four measurements of water level at "BCS-01," a stage recorder in Botheration Creek. The measurements showed the water level in the creek at that point to be 0.1 to 0.32 feet. NTC/Knight also sampled for taxa of macroinvertebrates in the reach of the creek. NTC/Knight identified 46 taxa, including mussels and six long-lived taxa. The presence of the long-lived taxa and mussels indicate that the reach of the creek in the vicinity of the stage recorder should be considered to be a perennial stream. Botheration Creek is high-quality water and, as shown by NTC/Knight's sampling, it contains a diverse mix of aquatic invertebrates and fish. A drop in the level of Botheration Creek of 0.2 feet predicted by the HGL Model would have caused the creek to go dry at BCA-01 during three of the four dates on which the water level was measured. Such a drop would convert the reach of the creek in the vicinity of the stage recorder from a perennial to an intermittent stream and would eliminate the reach's viability for long-lived taxa. Similarly, upstream reaches that are intermittent would become ephemeral (streams that flow only during periods of high rainfall). If the Wellfield becomes fully operational as allowed by the Permit, there will be a reduction in the Surficial Aquifer at Botheration Creek of between 0.2 and 0.3 feet. The reduction in the aquifer will reduce flow in Botheration Creek, reduce the volume downstream, including in Pine Log Creek, and reduce out-of-bank flood frequency and duration. The result will be a reduction in nutrients delivered downstream and to the floodplain to the detriment of plants and animal life that depend on them. Additionally, other reaches of the creek that have perennial flow will be converted to intermittent streams and reaches that are intermittent will become ephemeral. The result will be the elimination of plant and animal species currently living in these portions of the creek. The impact of the HGL Model predicted drawdown to steepheads depends on the individual steephead and the drawdown contour at its location and the amount of rainfall. Four steepheads on the NTC/Knight Property could suffer impacts similar to the impact at Russ Steephead to which Dr. Pruitt assigned a high probability of impact. Russ Steephead is located on the NTC/Knight Property above Russ Pond. NTC/Knight installed Surficial Aquifer wells at Russ Steephead between the HGL Model's predicted 0.5 and 0.6 foot Surficial Aquifer drawdown contours. NTC/Knight also installed a stage recorder just downstream from the steephead. During drought, NTC/Knight observed a loss of flow from the sidewall seepage areas and in the Russ Steephead Stream. If the Surficial Aquifer at Russ Pond were to be drawn down by 0.5-0.6 feet, the sidewalls of the Russ Steephead Stream and the stream itself would lose flow in times of drought. The loss of flow would lead to oxidation and loss of organic materials in the stream channel and flood plain, resulting in soil subsidence. If the water level at the terminus of the Russ Steephead Stream were drawn down, headward down cutting in the stream channel would be induced. In such a case, in the words of Dr. Pruitt, "there is a high probability that if drawdown occurs and . . . over a long period of time," the process will make the steephead "look more like a gully . . . ." Tr. 2120. The drawdown will also reduce the frequency and duration of inundation of the sphagnum bogs in the four steepheads likely to be affected by the drawdown. The bogs and the associated animals that depend upon them would be lost. Dr. Means identified a number of temporary ponds within HGL's predicted drawdown of the Surficial Aquifer. Nine were between the 0.3 and 0.6 foot drawdown contour, and two were between the 0.6 and 0.7 foot drawdown contours. These ponds and plant and animal communities dependent upon them would likely be harmed by the drawdowns. Mr. Cantrell offered testimony to rebut the Petitioners' case on wetland impacts. His testimony was based on an evaluation of aerial photography, site visits to the Wellfield, and a one-day trip to the NTC/Knight Property. It is Mr. Cantrell's opinion that if the NTC/Knight Property were to drain, it would be because of a surface water drainage system, such as ditching, not because of drawdown in the Surficial Aquifer caused by operation of the Wellfield. Mr. Cantrell's opinion is that because the Area has been subjected to a wide range of fluctuations in water levels and the wetland systems have survived, operation of the Wellfield will not have significant impacts. Mr. Cantrell's opinion, however, overlooks the effect of constant drawdown during times of severe drought. That wetlands have survived severe drought in the past does not mean they will survive severe drought conditions exacerbated by drawdown caused by operation of the Wellfield. Monitoring Special condition 19 of the Permit requires Bay County to implement the LTEMP after the Permit is issued. The LTEMP requires Bay County to establish a monitoring network, but does not provide the location of any particular monitoring site. Sites identified in the LTEMP are recommended, but the ability to use a particular site is dependent on field verification of suitability and authorization by the landowner. Over half the area designated in the LTEMP from the HGL Model's projected 0.5 foot drawdown in the Surficial Aquifer is located on the NTC/Knight Property. It will be necessary, therefore, to include sites on the NTC/Knight Property in the ultimate environmental monitoring network. The LTEMP's recommended sites do not include monitoring of some of the most susceptible wetland systems: temporary ponds, the Botheration Creek hillside seepage bogs, and the perennial headwaters of Botheration Creek. Without this monitoring, the LTEMP will be unable to detect whether these systems are harmed by withdrawals. The Permit and LTEMP require no more than one-year of baseline data to be collected prior to initiation of water withdrawals. The proposed monitoring time is inadequate to create a sufficient record for use in determining whether a reduction in water levels is attributable to water withdrawals or natural phenomena, such as drought. Baseline monitoring should be conducted for a sufficient duration to ensure that a full range of wet and dry years is captured. The LTEMP describes the types of data that are to be collected. A missing component is sampling for frogs, salamanders, and other amphibians that are sensitive to changes in hydrologic regimes and which depend upon infrequent periods of inundation in order to breed. This type of faunal sampling is particularly important in the temporary ponds and seepage environments. Without sampling for the presence of these species, the LTEMP will be unable to determine whether these populations have been harmed by withdrawals. The LTEMP includes a number of "triggers," that if tripped, require the preparation of an auxiliary report. A number of these triggers make reference to changes in water levels at the level of "significant deviation," an undefined term. More importantly, the LTEMP fails to require any statistical analysis. Without it, the LTEMP will be inadequate to establish whether a reduction in water levels is caused by water withdrawals or another cause. Similarly, other triggers lack sufficient detail to determine when they are tripped, such as those that refer to downward movement of plants. Finally, even if one of these triggers is tripped and an auxiliary report is prepared, nothing in the Permit or LTEMP sets forth the circumstances under which withdrawals would need to be curtailed and by what amount. The purpose of the LTEMP is to determine whether withdrawals are causing harm to the wetlands within the vicinity of the Wellfield. The LTEMP fails to provide reasonable assurance that it will succeed in achieving its purpose. Reasonable-Beneficial Use Use if the Reservoir is Unavailable In the event of Reservoir unavailability, Bay County is likely to need much less than 30 MGD. The need is likely to fall between 7.42 MGD and 9.71 MGD for the current population. In 2013, the need is likely to fall between 9.40 MGD and 12.29 MGD. See NTC/Knight Ex. 5, p. 4 of 4. The Permit, however, does not limit Bay County to emergency or backup use. While Bay County might voluntarily limit withdrawals to emergency use or backup supply, it has unfettered discretion to determine what constitutes an emergency or the necessity for a backup supply. The Permit is also not restricted to essential uses. Authorization of 30 MGD provides more than Bay County's current average daily demand for potable water. If the Permit restricted the use to essential uses, the authorization would be far less than 30 MDG. The District commissioned King Engineering to assist in development of a "Coastal Water Systems Interconnect Project" (the "Interconnect Project"). On average, the utilities subject to the Interconnect Project estimated that 42 percent of the average daily demand is dedicated to essential uses with the remaining 58 percent going to non-essential uses. Consistent with the estimate, the Project set a target of 50 percent of average daily demand to be allowed for use in an emergency. None of the information from the Interconnect Project, however, was used by the District in setting the limits of withdrawal in the Permit. b. Daily Use Bay County claims the 5 MGD annual average allocation under the Permit is needed for several reasons, principally the maintenance of pumps. Bay County's justification for 5 MGD is found in testimony from Mr. Lackemacher and a document he authored entitled, "Confidential Draft for Internal Use Only 5 MGD Pumping Rate" (the "Lackemacher Confidential Draft"), admitted as Bay County Ex. 24. Mr. Lackemacher's testimony follows: A. The fact is that there are no absolute knowns when we're talking about what needs to be. Q. What do you mean? A. Well, here we have a document [Bay County Ex. 24] where I talk about rationalization for 5 million gallons a day, why we would need it, mechanical reasons, financial reasons, regulatory reasons. I always felt that it was very difficult to justify a number. I don't know. We haven't designed the system. We haven't got all of the wells in. We don't know what their specific yields are. There's unknowns here. So do we need 2 million gallons a day or 5 million gallons a day? I don't know. I don't know that. But here is the rationalization for 5 million if that's in fact what we need. We may very well find out that we don't need 5 million gallons a day. Q. Is that because you don't know the precise locations of the well and how they're going to be piped and distributed? A. That's absolutely true. Q. Well, did you in this report, Exhibit 24, did you make some reasonable assumptions? A. I based it on some of the values as you discussed or as I pointed out earlier from Hatch Mott MacDonald's preliminary design. * * * Q. And do you feel confident that your analysis supported that in the area of 5 million gallons a day is what would be needed to operate the wellfield? A. Yes. And that's why the paper was generated that [is] a justification for 5 million gallons a day, here's what we think we would need. Tr. 209-10. The Lackemacher Confidential Draft is a one-page, written justification for the 5 MGD. Based on the Hatch Mott McDonald Report, see tr. 210, it considers regulatory, mechanical and financial factors. It is not supported, however, by engineering analysis. Any financial analysis found in the Hatch Mott McDonald Report, moreover, is far from complete. The factors taken into consideration are recited in the most general of terms. For example, of four such factors, the document lists the second as: "All water pumps are designed to run - turning pumps on and off is not the best situation for the overall electrical efficiency or the mechanicals of a pump." Bay County Ex. 24. Consistent with Mr. Lackemacher's testimony, the document concludes that the amount of water needed to run each well is unknown. The financial justification is based on costs shown in the Hatch Mott MacDonald Report for construction and operation of 22 wells, ten more wells than are contained in the Wellfield and without any analysis of revenue to recoup the costs. The financial justification is a bare conclusion on the part of Mr. Lackemacher: We cannot afford to operate a well field at a financial loss, based on this fact alone we would have to pump a minimum of 4.49 MGD. Combined with the fact that we don't know what volumes of water have to be turned over to ensure water quality 5 MGD seems quite reasonable. Bay County Ex. 24. The Lackemacher Confidential Draft is dated May 17, 2011. It was not part of Bay County's Application nor was it submitted to the District prior to the decision to issue the Permit. Although the District attempted to obtain information from Bay County about what was needed for maintenance, Bay County did not provide it. As Mr. Gowans testified, "[t]hen I finally told staff, [s]top asking, we're not going to get the numbers . . . ." Tr. 552. The District performed no analysis to determine the minimum amount of water needed to maintain the Wellfield. In contrast, NTC/Knight and Washington County presented the testimony of Phillip Waller, an engineer accepted as an expert in the design and construction of potable water systems, including groundwater wells, surface water, and transmission and distribution of drinking water. Mr. Waller testified that if the wells were connected to a central treatment system, there would not be the need to flush the pipeline for disinfection prior to use of the well in an emergency. Only 2.4 million gallons per year or 6,500 gallons per day would be needed to maintain optimum operating conditions, an amount far less than 5 MGD. Mr. Waller's experience when groundwater is used as a backup, moreover, is that they are operated periodically. While prudent to periodically operate backup wells especially in advance of hurricane season, vertical pumps in wells, unlike horizontal pumps, do not have a need for frequent operation because of even force distribution. They certainly do not need to be continuously operated. "In fact, wells routinely are idle for months at a time." Tr. 1123. Interference with Existing Legal Users In its Revised Staff Report dated July 18, 2011, the District wrote: Nearby Users: Under the most intensive pumping activity, drawdown in the Upper Floridan Aquifer is predicted to be approximately 15 feet in the vicinity of the nearest private wells. Water level declines of this magnitude may cause water levels to fall below the level of the pump intake in some privately-owned wells. Joint Ex. Vol. IV, Tab Q, p. 4. The District's high estimate of the number of wells used by existing legal users that might suffer impacts approaches 900. The exact number or whether any existing legal users would be likely to suffer impacts was not proven. Alternatives Groundwater wells, if installed and attached to the fitting in the existing transmission line that delivers water from the Pump Station to the Water Treatment Plant, could serve as backup to the Reservoir. Bay County did not conduct a study of whether groundwater in the area of the transmission line was adequate to serve as an alternative. Mr. Waller, on behalf of NTC/Knight and Washington County, on the other hand, testified that the transmission line could support ten wells with a capacity of 10 MGD and could be constructed at a cost of $12 million, far less than the Wellfield. The area of the transmission line is in an area identified by the District as acceptable for the creation of potable water wells. The area does not present a significant risk of saltwater intrusion if not used continuously. The water meets the drinking water requirements for the Department of Environmental Protection and the Department of Health. The existing transmission line alternative is located near the existing raw water supply line which minimizes the need for additional piping. There is sufficient length along the existing raw water pipeline to accommodate ten wells. The existing transmission line alternative, therefore, has significant potential to succeed as a water supply backup to the Reservoir. NTC/Knight and Washington County, through Mr. Waller, also proposed another alternative: an intake at Bayou George. Near Highway 231, the main pipeline from the intake would run along public right-of-way. North of the existing intake in Williams Bayou and three miles north of the Dam, the proposed intake would be less susceptible to contamination from storm surge. Neither Bay County nor the District presented a thorough analysis of any alternative to the Wellfield. In contrast, NTC/Knight and Washington County presented the testimony of Mr. Waller that there are two alternatives that could be constructed at much less cost than the Wellfield and that have significant potential of providing backup supply.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Northwest Florida Water Management District enter a final order that denies the application of Bay County for the individual water use permit at issue in this proceeding. DONE AND ENTERED this 26th day of July, 2012, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 26th day of July, 2012.
Findings Of Fact Petitioner, Kamran Khajeh-Noori, who does business as Khajeh-Noori Laboratory, transacts that business at 2742 North Florida Avenue, Tampa, Florida. Respondent, State of Florida, Department of Health and Rehabilitative Services, is an agency of State government whose principal business is at 1323 Winewood Boulevard, Tallahassee, Florida. The Department of Health and Rehabilitative Services has promulgated a Rule 10D-41.60, Florida Administrative Code, which allows the revocation, suspension, limitation, annulment or denial of renewal of the certification of various laboratories based upon certain stated reasons. In particular, the rule states: Denial or Revocation of Certification. A laboratory certification may be denied, revoked, suspended, limited, annulled or renewal denied for any or all of the following reasons: Making false statements on an application or on any document associated with certification. Demonstrating incompetence or making consistent errors in analyses. Permitting unauthorized personnel to perform analyses. Falsifying the results of analyses. Failure to employ approved labora- tory methodology in the performance of analyses required by the Act. Failure to properly maintain facilities and equipment. Failure to properly report analytical test results or to maintain required records of test results. Failure to participate success- fully in the DHRS performance evaluation and/or quality control program. Violating or aiding and abetting in the violation of any provision of these regulations or the rules promulgated here- under. The stated specific authority for this rule is Section 403.863, Florida Statutes, and the rule purports to implement that same provision of law. Section 403.863, Florida Statutes, is part of the Florida Safe Drinking Water Act. Petitioner, through his laboratory, was engaged in the business of analyzing water samples prior to the enactment of the Florida Safe Drinking Water Act. Following that enactment and the adoption of certification rules by the Department, he received a certificate from HRS to continue the operation of his water testing laboratory. In keeping with the various provisions found in Chapter 10D-41, Florida Administrative Code, the Department of Health and Rehabilitative Services has conducted surveys of the Khajeh-Noori Laboratory and subsequent to those surveys has filed an Administrative Complaint under the authority of Rule 10D-41.60, Florida Administrative Code. This Administrative Complaint has been the subject of a formal hearing in State of Florida, Department of Health and Rehabilitative Services v. Kamran Khajeh-Noori d/b/a Khajeh-Noori Laboratory, DOAH Case No. 81- 2979. That hearing was held on the same date as the present matter, that is August 11, 1982. The possible outcome of that proceeding might lead to the revocation, suspension, or annulment of the certification granted Khajeh-Noori Laboratory, thereby prohibiting the performance of those activities allowed by his certificate.
Findings Of Fact Ed Smith is the President of Riverside Village Mobile Home Park, Inc., which in turn is the owner of the mobile home park in question in this case. The mobile home park is located in Ruskin, Hillsborough County, Florida. Petitioner was served with an Administrative Complaint alleging that the chlorine residual in the park water supply distribution system was inadequate and that this constituted a violation of Chapter 513 and Section 386.041(1)(f), Florida Statutes, as well as Rule 10D-26.67(1), Florida Administrative Code. Specifically, the Administrative Complaint alleges violations occurring between July 16, 1986 and July 29, 1986, and seeks the imposition of a civil penalty in the amount of $500 per day which "shall be calculated when this complaint is received by the (Petitioner), and will run until the violation has been corrected." Petitioner requested a hearing to contest these allegations, and his request was filed with Respondent's Clerk on October 8, 1986. It was not established by competent substantial evidence when Petitioner "received" the Administrative Complaint which is the subject of this action. The only evidence of any violation occurring between July 16 and July 29, 1986 was the testimony of Harry Messick who signed an Official Notice and Notice of Intended Action which were both dated July 16, 1986, and which alleged that "chlorine reading found at time of inspection (was) between 0.1 ppm and (a) trace." However, Messick did not perform any test to either produce or confirm this result. He testified that someone else performed the field test, but there was no testimony from anyone else who may have actually conducted a test on Petitioner's water supply system on July 16, 1986. Therefore, it has not been established by competent substantial evidence that Petitioner's water supply system on July 16, 1986, was in violation of the requirement that .2 mg/1 of free chlorine residual be maintained. Testimony from Respondent's other witnesses, Norman Vik and Neil R. Schobert, indicates Vik was not even at Petitioner's mobile home park between July 16 and 29, 1986, and the only test conducted by Schobert found that Petitioner's water supply system was in compliance on July 24, 1986. Design modifications in Petitioner's water supply distribution system were approved by the Hillsborough County Health Department on July 9, 1986.
Recommendation Based on the foregoing, it is recommended that Respondent enter a Final Order DISMISSING the Administrative Complaint filed against Petitioner. DONE AND ENTERED this 19th day of February 1987 in Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of February 1987. APPENDIX (DOAH Case No. 86-4094) Rulings on Respondent's Proposed Findings of Fact: 1. Adopted in Finding of Fact 1. 2-3. Rejected in Findings of Fact 4, 5. COPIES FURNISHED: James A. Sheehan, Esquire Florida Federal Building One Fourth Street North Suite 800 St. Petersburg, Florida 33701 Carol M. Dittmar, Esquire 4000 West Buffalo Avenue Suite 520 Tampa, Florida 33614 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32301 John Miller, Esquire General Counsel Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32301 =================================================================
Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby, RECOMMENDED: For sixty (60) days from service of the Final Order, the Respondent, Thomas Hearns, shall not have to institute that construction required by paragraph 3 below. However, within the sixty (60) days the Respondent shall obtain a firm purchase commitment from a qualified purchaser. A firm purchase commitment is either a signed contract of purchase or a signed contract to purchase between the Respondent and a qualified purchaser. A qualified purchaser is a person or other legal entity that the Petitioner and Polk County Health Department adjudge to be capable of taking over the water system, bringing it into compliance with Chapter 17-22, Florida Administrative Code, and thereafter keeping the system in compliance with Chapter 17-22, Florida Administrative Code. Upon obtaining a purchase commitment, the Respondent shall send a copy of the purchase commitment to the Department of Environmental Regulation and Polk County Health Department. Within twenty (20) days of receipt the Petitioner and the Polk County Health Department shall review the purchase commitment for its acceptability as a firm purchase commitment by a qualified purchaser. Written notice as to whether the Respondent has obtained a commitment which is a commitment by a qualified purchaser shall be given to the Respondent by the Petitioner. The Respondent, to the extent contained in this paragraph, waives his right and capacity to contract and specifically reserves unto the Petitioner the right to void any purchase commitment that is determined to be other than a firm purchase commitment from a qualified purchaser. Failure of the Respondent to obtain a firm purchase commitment within sixty (60) days of service of the Final Order on the Respondent will cause the times and measures for corrective action, contained in paragraph 3 below, to become effective as of the sixty-first (61st) day from the date of service of the Final Order on the Respondent. The corrective actions and the times for taking them are: Within thirty (30) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall install disinfection equipment into the Respondent's water system. The disinfection equipment must be capable of maintaining the degree of disinfection required by Section 17-22.106(3)(c), Florida Administrative Code. The required degree of disinfection shall thereafter be maintained throughout the water system at all times and the disinfection equipment shall be kept in continual operation. Sections 17- 22.106(3)(c) and 17-22.107(3)(a), Florida Administrative Code. Within fifteen (15) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall, by collecting and submitting two (2) samples for analysis, initiate the collection of water samples of the Respondent's water system and the Submission of the samples for microbiological analysis. Thereafter, the Respondent shall collect and submit for analysis two (2) compliance samples per month. Section 17-22.105(1)(d), Florida Administrative Code. Within fifteen (15) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall notify, by written notice to each customer, all customers of the Respondent's water system of the fact that the Respondent fails to perform microbiological monitoring. Section 17-22.112, Florida Administrative Code. Within fifteen (15) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall retain the services of a certified operator who shall thereafter operate, maintain and supervise the Respondent's water system. Section 17-22.107(3)(b), Florida Administrative Code. Within forty-five (45) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall commence, by the submission of a monthly operation report on the water system, the submission of monthly operation reports to the Department. Thereafter, such reports shall be submitted monthly. Section 17-22.111(2), Florida Administrative Code. Within thirty (30) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall commence, by the submission of the results of the analyses of the samples taken pursuant to subsection 3.B. above, the monthly submission of the results of analyses taken by the Respondent to fulfill his Section 17-22.105(1)(d), Florida Administrative Code, monitoring requirement. Thereafter, the Respondent shall submit monthly the results of compliance monitoring. Sections 17-22.107(3)(c) and 17-22.111(2), Florida Administrative Code. Within forty-five (45) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall submit "as-built" engineering plans of the water system, as well as an application for a construction permit. The construction permit shall contain plans and specifications for proposed construction which shall: (1) install a downopening sampling tap on the discharge side of the well pump, and (2) install a bypass and a drain on the system's pressure tank. Within forty-five (45) days of the sixtieth (60th) day from service of final orders in this case, the Respondent shall submit to the Department's Southwest District Office, Tampa, Florida, the sum of Two Hundred Fifty Dollars and Sixty-nine Cents ($250.69). The Petitioner waives payment of the costs of investigation in this case if the Respondent has a firm purchase commitment from a qualified purchaser within sixty (60) days of service of the Final Order on him, or the Respondent complies with the corrective measures and times stated in paragraph 3, AG, above. The Petitioner will place the Respondent in touch with the Department of Community Affairs and the Federal Farmers Home Administration within ten (10) days of service of the Final Order on the Respondent. Within fifteen (15) days of service of the Final Order, the Petitioner shall contact Imperial Polk County's Sam Robinson to urge the purchase of the water system. The Department shall also investigate whether it has funds which Imperial Polk County might obtain in order to purchase the water system. The Petitioner shall notify the Respondent of its investigation within fifteen (15) days of service of the final orders on the Respondent. Alteration of the Final Order may be accomplished by written amendment of the Final Order, signed by both the Petitioner and Respondent. The Petitioner reserves solely to itself the authority to determine whether the Final Order shall be amended due to good cause shown by the Respondent. Among other things, good cause may be delays caused the Respondent due to actions of others beyond his control. In order that the corrective measures stated in paragraph 3 above be accomplished within the stated times, it shall not be good cause for postponement of any of the corrective measures set forth in paragraph 3 above that the Respondent has filed an application for financing of the corrective measures at a time that does not allow time for processing the application prior to the sixty-first (61st) day from service of the Final Order on the Respondent. RECOMMENDED this 6th day of April, 1979, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Vance W. Kidder, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Thomas Hearns Post Office Box 1916 Winter Haven, Florida 33880
Findings Of Fact The parties stipulated, and it is so found, that Petitioner, DER, has jurisdiction over both the issues and the Respondents Dey and KWC. KWC owns and operates a water system which supplies water to both residential and commercial customers in the City of Keystone Heights, Florida. Virginia Key is the President of KWC, a member of the Board of Directors of the corporation, and one of the five stockholders. The other stockholders are her sisters. The five sisters are the daughters of the late G. E Wiggins, and inherited the company from him at his death in 1969. Mr. Wiggins developed the water company in the 1920's and operated it until his death. KWC came under the jurisdiction of the Florida Public Service Commission (PSC) just prior to Mr. Wiggins' death. At that time, pursuant to a PSC requirement, it was assessed and valued at a sum in excess of $250,000.00 by a consultant firm hired for the purpose. As of late November, 1984, KWC served approximately 752 residential customers which, when multiplied by an average 2.5 persons per family factor, results in a total of approximately 1,880 residential inhabitants served by the water system. In addition, the system serves 105 commercial customers. It is impossible to estimate with any reasonable degree of accuracy the number of individuals involved in the commercial service. The system consists of three wells drilled in 1940, 1946, and 1960 to a depth of 350, 450, and 492 feet respectively. Total yield from the three wells is normally 1,350 gallons per minute. The wells are generally well protected against surface water infusion, are normally not subject to inundation, and have had no salt water infiltration problems in the past. At the present time, well number 2, drilled in 1946, with a 350 gpm yield is out of service. The water, when pumped from the ground, is stored in two tanks-one with a 60,000 gallon capacity and the other with a capacity of 800 gallons. Both tanks are steel. Chlorine is added to the water in each storage situation by a hyper-chlori- nation system before the water is sent to the storage tank. The distribution system is made up of 6" and 2" diameter pipe. In March, 1984, two different inspections of the water system, done by, in one case, an environmental specialist and in the other, an Engineer I with DER, revealed several deficiencies in the maintenance and operation of the system all of which constitute violations of DER rules. Specifically, these include (1) failure to provide an auxiliary power source in the event the main pumping capability of the system is lost, (Rule 17-22.106 (3)(a); (2) failure to utilize for the system an operator certi- fied by the state with a Class C license, (Rule 17-22.107(3)(b); (3) failure to maintain a free chlorine residual in the water of at least 0.2 ppm in the system, (Rule 17-22.106(3)(c); (4) failure to maintain a minimum pressure of 20 ppi in the distribution system, (Rule 17-22.106(3)(f); (5) failure to have a gas chlorination facility, (Rule 17-22.106(3)(d); and (6) failure to obtain proper permits to expand the distribution system, (Rule 17-22.108 (1)(b) Rule 17-22, F.A.C., sets up requirements for safe drinking water and was designed to establish guidelines and standards for facilities and water and to bring water into compliance with the Federal Act. Twenty ppi of pressure in the system was adopted as a standard minimum for residual pressure to protect against outside contaminants getting into the water system. Such contaminants could come from ground water, leaks, and water in storage tanks attached to the system such as toilet tanks, being aspirated into the system. Also a certain amount of pressure is required to operate appliances. Normally minimum pressure is found in areas at the edge of the system and in those areas where inadequate chlorination is located. They interact and both pressure and chlorinization are required. Chlorine can be injected into the system generally in two ways: the first is through gas chlori- nation and the second, through hyper-chlorinization as is used in the instant system. The effectiveness of hyper-chlorinization is limited, however, by the size of the system. Basically, hyper- chlorinization is effective when the demand in the system for pressure is no more than 10 ppi. Above this, gas chlorinization is necessary. As late as January 4, 1985, Mr. Dykes went to Keystone Heights to test the system. His tests showed that 11.9 ppi is the average daily flow per 24 hours for the last 12 months. Since this figure is above 10 ppi, in his opinion, a gas chlorinization system would be needed. Chlorine is used to purify water because it has been shown, through long use, to prevent disease. The requirement for a residual chlorine level in water, therefore, is consistent with that concept to insure chlorine is always in the water in sufficient quantity to prevent disease. Respondent's plant has less than the 0.2 residual that is required under the rule. This insufficiency is caused by the inadequate chlorinization system which has insufficient capacity to provide the appropriate amount of chlorine. At the current level, it is providing only approximately 60 percent of the needed chlorine. To correct this deficiency Mr. Dykes recommends installation of a gas chlorinization system. In addition, the pneumatic tank storing the water from the number 3 well does not give sufficient detention time to allow for appropriate reaction of the chlorine contained in the water before the water is released into the distribution system. Another factor relating to the lack of adequate pressure in the system is the fact that, in Mr. Dykes' opinion, too much of the system is made up of 2" diameter water line. A line of this small diameter prevents the maintenance of adequate pressure especially in light of the fact that there are numerous old lines in the system some with corrosion and scale in them which tends to reduce pressure. This latter factor would be prevalent even in the 6" lines. The current plant manager, Mr. Cross, who has been with Respondent for approximately 4 years is, with the exception of one part time employee, the only operations individual associated with the plant. As such, he repairs the meters and the lines, checks the pumps, the chlorinator, and checks and refills the chlorine reservoir on a seven day a week basis. Be learned the operation of the plant from his precedessor, Mr. Johnson, an unlicensed operator who was with the company for 10 years. Mr. Cross has a "D" license which he secured last year after being notified by DER that a license was required. It was necessary for him to get the "D" license before getting the required "C" license. At the present time, he is enrolled to take courses leading toward the "C" license. At the present time, however, he is not, nor is anyone else associated with KWC, holding a license as required. The rule regarding auxiliary power provides that all community systems serving 350 or more persons shall have standby pumping capability or auxiliary power to allow operation of the water treatment unit and pumping capability of approximately one-half the maximum daily system demand. Respondent has admitted that the system is not equipped with an auxiliary power source and it has already been established that more than 350 persons are served by the system. Respondent also admits that subsequent to November 9, 1977, it constructed main water lines for the system which required the obtaining of a permit from either the Petitioner or the county health unit. Respondent admits that it did not obtain or possess a permit to do the additional construction referenced above from either DER or the Clay County Health Department prior to the construction of the water lines referenced. The inspections referenced above, which identified the problems discussed herein, were accomplished by employees of Petitioner, DER, at a stipulated cost of $898.10. Respondent contends, and there is no evidence to the contrary, that there have been no complaints of contaminated water and that the monthly water samples which Mr. Cross forwards to the Clay County Health Department have been satisfactory. Mr. Cross also indicates that a September, 1983 DER analysis of water samples taken from the system was satisfactory. However, bacteriological analysis reports on water collected from Respondent's system on July 11 and 27, 1983, reflect unsatisfactory levels of either coliform or non-coliform bacteria in the water requiring resubmission of test samples. Respondent also contends that no one has ever gotten sick or died from the water furnished by the system and there is, in fact, no evidence to show this is not true. Even though so far as is known, no one has ever been made sick from the water in the system, in Mr. Dykes' opinion, the risk is there. As a result of the defects identified in this system, insufficient chlorine is going into the system to meet reasonable health standards. Though this does not mean that the water is now bad, it does mean that at any time, given a leak or the infusion of some contaminant, the water could become bad quickly, and the standard established by rule is preventive, designed to insure that even in the case of contamination, the water will remain safe and potable. Respondent does not deny that it is and has been in violation of the rules as set out by the Petitioner. It claims, however, that it does not have sufficient funds available to comply with the rules as promulgated by DER. Respondent has recently filed a request for variance under Section 403.854, Florida Statutes, setting forth as the basis for its request that it does not have the present financial ability to comply with any of the suggested or recommended corrective actions to bring its operation into compliance with the rules. Mr. Protheroe, the consulting engineer who testified for Respondent has not evaluated the system personally. His familiarity with it is a result of his perusal of the records of the company and the Petitioner. Based on his limited familiarity with the system, he cannot say with any certainty if it can be brought into compliance with, for example, the 20 ppi requirement. There are too many unknowns. If, however, the central system was found to be in, reasonably good shape, in his opinion, it would take in excess of $100,000.00 to bring it within pressure standards. To do so would require replacement of the 2" lines, looping the lines, and cleaning and replacing some central system lines as well. In his opinion, it would take three months to do a complete and competent analysis of the system's repair needs. Once that was done, he feels it would take an additional three months to bring the plant into compliance with DER requirements. Other repairs, such as those to the lines outside the plant, would take longer because some are located in the downtown area and have interfaced with other utilities. This could take from three to four months if the money were available to start immediately. Here, however, it has been shown that it is not. Consequently, to do the study and then, if possible, procure the funds required, could take well in excess of six months or so. Mr. Protheroe contends, and there is little if any evidence to indicate to the contrary, that to replace the current system with a new one entirely as it is currently constituted would cost at least $250,000.00. However, in his opinion, no one would ever put in a new system similar to the one currently there. He cannot say how much it would cost to buy the system and make the necessary corrections to it to rectify the deficiencies. His familiarity with the system is not sufficiently complete to do this. He cannot say exactly how much the system is worth in its current state, but he is satisfied that it is worth more than $65,000.00. In that regard, Mrs. Dey indicated that in her opinion, the fair market value of the system is currently at $250,000.00. At the present time, there are current outstanding loans in excess of $9,000.00 at 16 percent interest. This current loan basis has been reduced from a higher figure. In 1977, the company borrowed $15,000.00 at 9 percent. In 1981, it borrowed $5,000.00 more at 18 percent. In 1982, the loans were consolidated at an increased rate of 16 percent and the officers have been advised by their current creditors that they cannot borrow any more money for the system in its current state. They would sell the system if a reasonable price could be realized. However, any inquiries on prospective purchases have been chilled by a low rate base assigned by the PSC. In that regard, the City of Keystone Heights offered to purchase the system for $59,000.00. This offer was declined as being unreasonable. Nonetheless, in light of the low rate base assigned by the PSC in its order issued on December 21, 1981 of slightly over $53,000.00 the offer by the city of $59,000.00 is not completely out of line. A certified public accountant, in KWC's December 31, 1983 financial report assigned a valuation of approximately $62,000.00, again a figure only slightly higher than that offered by the city, but substantially less than the $175,000.00 price asked of the city by Respondent Dey and her sisters. Mrs. Dey indicated that to the best of her knowledge the PSC denied rate increases for the purposes of improvements. In the presentation before the commission, respondents relied exclusively on the services of their attorney and accountant. Evidence from Mr. Lowe, of the PSC, however, indicates that KWC has never requested a rate increase to finance any of the improvements called for here. In the PSC order referred to above, Respondent was awarded a 12.25 percent rate of return on its rate base. This figure was an amalgam of a more than 13 percent rate on equity and a lesser figure for cost of doing business, including debt. At the time of that hearing, however, the debt cost was based on a 9 percent interest figure. The 16 percent interest figure came afterwards and no hearing has been requested based on the higher interest rate and it is so found.
Recommendation Based on the foregoing findings of fact and conclusion of law, it is, therefore: RECOMMENDED that Respondents Virginia W. Day and the Keystone Water Company be ordered to comply with the Orders for Corrective Action previously filed herein to bring the water system in question in compliance with the Florida Safe Water Drinking Act without delay or suffer the penalties for non- compliance called for by statute and, in addition, pay costs of investigation in the amount of $898.16. RECOMMENDED in Tallahassee, Florida this 19th day of February, 1985. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of February, 1987. COPIES FURNISHED: Debra A. Swim, Esquire Assistant General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 John E Norris, Esquire 10 North Columbia Street Lake City, Florida 32055 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301
The Issue The issue in this case is whether the portion of Consumptive Use Permit (CUP) Application Number 97106 seeking an allocation of 499,000 gallons per day (gpd) of groundwater for commercial/industrial uses (supply bulk water to bottling plants) meets the conditions for issuance as established in Section 373.223, Florida Statutes, Florida Administrative Code Rule 40C-2.301, and the Applicant’s Handbook, Consumptive Uses of Water.1 The County does not oppose or contest the portion of the CUP application authorizing use of 6.0 million gpd of surface water for limerock mining operations.
Findings Of Fact The Parties The County is a political subdivision of the State of Florida. The County operates a water supply utility that supplies water for a variety of uses, including providing untreated water, in bulk, for bottling purposes. The County is currently engaged in a long-range planning effort designed to assess water supply demands and sources to supply those demands in the County over the next 50 years. The County also has completed a study of the two major springs in the County (Rainbow Springs and Silver Springs), and the County’s Board of County Commissioners is in the process of enacting certain recommendations contained in the study. The well for the proposed CUP allocation is located on approximately 160 acres in northern Marion County. Hastings and Greene's father owned the property from 1978 until the latter's death. In 1993, the latter's interest was transferred to Greene and two brothers, who now hold title to the property along with Hastings. The District is a special taxing district created by Chapter 373, Florida Statutes, and is charged with the duty to prevent harm to water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The District has implemented Chapter 373, Florida Statutes, in part, through the adoption of Rule Chapters 40C-2 and 40C-20, and the Applicant’s Handbook, Consumptive Uses of Water. Historic Uses of Water on the Mine Site Since the 1980s, the property where the proposed withdrawals will occur has been used for mining of limerock and has been known as the “Black Sink Mine." A ten-inch diameter well has been located on the Black Sink Mine property for 35 years. The well was originally used to provide water to augment water levels in canals in and around the Black Sink Mine property. Later the well was used to irrigate watermelons grown on the property before the mining operation began. The limerock mining operation at Black Sink Mine uses approximately 6 million gpd of surface water. The mine pit at the site is divided by an earthen berm that separates a larger, previously mined area from a smaller area where active mining is occurring. Surface water is pumped from the actively mined portion of the pit to the larger, previously mined portion of the pit, to enable mining of the limerock material to be conducted at levels below the water table. Dewatering is necessary in order to remove the limerock. A majority of the property is mined to a depth of 55 feet below land surface. The limerock material extracted from the site is transported by trucks from the site, approximately 100 trucks per day, to various sites across North Florida. The Need for the Proposed Use of Groundwater If mining of limerock continues at the current pace, the limerock material at the Black Sink Mine will be exhausted within a year. Recognizing that the productive use of the property for limerock mining was nearing an end, Greene and Hastings began exploring other potential uses for the property, including use of the existing well on the property for production of bottled water. To explore the feasibility of producing water for bottling from the existing well, in 2004 Greene and Hastings engaged an engineering firm with expertise in water resources to conduct a hydrogeologic study of the mine property and well. The results of the study, showing water of sufficient quality and quantity for production of bottled water, motivated Greene and Hastings to submit the CUP application which was the subject of the hearing. The study also determined that water withdrawn from the well could be marketed as spring water. Greene and Hastings also determined through market research that the demand for bottled water has increased at the rate of ten percent per year for the last 4-5 years and that Florida bottlers were interested in purchasing water from the well on the mine site in bulk for bottling. In order to provide reasonable assurance that the water use proposed by Greene and Hastings is in such quantity as is necessary for economic and efficient utilization, Greene and Hastings must show that the amount to be used is consistent with what would typically be required for the activity being supplied; that the water will be used efficiently with loss or waste minimized; and that there is a demonstrated need for the water proposed for allocation. To demonstrate a need for the 499,000 gpd of groundwater requested in the application for an allocation of 499,000 gpd of groundwater, Greene and Hastings provided letters from two businesses engaged in bottling of water stating an intent to purchase specific quantities of water produced from the Greene and Hastings well should the CUP be granted. One of the letters of intent came from a bottler in Jacksonville, Florida, stating its intention to initially purchase 100,000 gpd of Greene and Hastings’s water. The other was from a bottler in Stuart, Florida, dated January 9, 2006, stating its intention to purchase 125,000 gpd of water from Greene and Hastings within “the next 12-24 months.” Based on these letters Greene and Hastings initially requested an allocation of 200,000 gpd of groundwater for the first year of the permit. Prior to completion of the CUP application, Greene and Hastings learned that because the Stuart bottler’s facility was located outside the geographic boundaries of the District, to transport water from the Black Sink Mine to the Stuart facility would require additional data and information related to inter- district transfers of groundwater. Greene and Hastings elected to reduce the requested allocation for the first year of the permit to 100,000 gpd, relying on the letter from the Jacksonville bottler. Based on the current market demand for bottled water, and based on the fact that there are other bottlers of water within the boundaries of the District purchasing water for bottling, it is reasonable to conclude that Greene and Hastings can sell 499,000 gpd of water from the well on the Black Sink Mine property by the end of the fifth year of the proposed CUP. These facts support the conclusion that there is a need for the amount of water requested by Greene and Hastings. In addition, the permit is conditioned to require a compliance review at five-year intervals during the term of the permit. Should Greene and Hastings not be successful in selling the full 499,000 gpd allocated by the fifth year of the permit, the District has the ability as part of the five-year compliance review to modify the permit to reduce the allocation based on the amount of water actually used for bottled water. Efficiency of the Proposed Use of Water The production of water in bulk for shipment to a bottler is a highly efficient use of water. There is very little if any water lost in the withdrawal and loading of the water; almost all the water goes to the end product. The evidence establishes that the use proposed by Greene and Hastings is an efficient use of water. Potential Impacts from the Proposed Groundwater Allocation The source of the groundwater proposed for use by Greene and Hastings is the Floridan aquifer. Because there is no confining layer in the vicinity of the Black Sink Mine that would retard movement of water between the Upper Floridan aquifer and the surficial aquifer, both the Upper Floridan aquifer and the surficial aquifer essentially behave as one unit. Thus, any drawdown in the surficial aquifer associated with groundwater withdrawals at this location will be the same as the related drawdown in the Upper Floridan aquifer as a result of groundwater withdrawals. The Floridan aquifer is capable of producing the amount of groundwater requested by Greene and Hastings in the application. To assess the level of drawdown expected to occur in both the Floridan aquifer and the surficial aquifer as a consequence of the proposed groundwater withdrawals, Greene and Hastings engaged a consultant, Andreyev Engineering, Inc., to run a groundwater model to simulate the proposed withdrawal and predict the anticipated drawdown. The groundwater model selected for use for this application was the North Central Florida Regional Groundwater Flow Model, a model developed for the District by the University of Florida for use in Marion County and surrounding areas. This model is an accepted and reliable tool for predicting aquifer drawdown associated with groundwater withdrawals at the location of the withdrawals proposed in this application and is used extensively by the District in its CUP program. To simulate the drawdown associated with the withdrawal of 499,000 gpd from the Florida aquifer, Greene and Hastings’s consultant inserted a pumping well in the model grid where the Black Sink Mine is located. The model then simulated pumping from the well at 499,000 gpd. The model results are graphically depicted on maps showing drawdown contours overlain on the Black Sink Mine Site, illustrating the level of drawdown in the aquifer and the distance the level of drawdown extends out from the well site. The model predicts a drawdown of 0.03 feet in the Floridan and surficial aquifers in the immediate vicinity of the well on the Black Sink Mine property, and a drawdown of 0.02 feet in the Floridan and surficial aquifers extending out to a distance of approximately 5,000 feet from the well, less than 1/3 of an inch of drawdown. The model results represent a reasonable estimation of the drawdown that will occur as a consequence of withdrawal of 499,000 gpd of groundwater at the Black Sink Mine as proposed in the application. The impact of the 0.02-0.03 foot drawdown predicted by the model was variously characterized by the experts who testified at the final hearing as “not practically measurable,” an “insignificant impact,” “very small,” or “de minimus.” The use of water proposed by Greene and Hastings will not cause significant saline water intrusion, nor will it further aggravate any existing saline water intrusion problems. The use of water proposed by Greene and Hastings will not induce significant saline water intrusion to such an extent as to be inconsistent with the public interest. Because the predicted drawdown is so small, it will not interfere with any existing legal uses of water. Neither will the predicted drawdown cause serious harm to the quality of the source of the water proposed for use by Greene and Hastings. With regard to the issue of interference with existing legal users, the County argued that the District should have considered whether there is sufficient groundwater available to meet all projected needs for water in the County during the 20- year term of the permit, as well as the additional cost County citizens will need to bear to secure alternative water supplies as a result of any future shortfalls in available groundwater. The County projects, based on planning estimates, that use of groundwater to supply all anticipated uses of water in the County will be limited within 20-30 years from the present. Such “limits” would not become an issue until after the Greene and Hastings permit expires. Thereafter, water users in the County will have to rely on alternative water sources, conservation, reuse of reclaimed water, and surface water. The anticipated growth in demand in the County’s planning estimates includes anticipated growth in the commercial/industrial category of uses. The County’s estimated limits on groundwater use will occur whether or not the CUP requested by Greene and Hastings is approved. The District does not base its permitting decisions on a pending CUP application on the possibility that the source of water may become limited at some future time for water uses not presently permitted, provided the application meets all permitting criteria. The District allocates water for recognized beneficial uses of water, such as commercial/industrial uses, as long as the water is available and the application meets District criteria. The District allocates water as long as an allocation does not cause harm to the resource. Based on these facts, the proposed use of water by Greene and Hastings will not interfere with any existing legal use of water. No Evidence of Economic or Environmental Harm Because the predicted drawdown associated with the proposed use of water is so small, and because no impacts are anticipated on any surrounding properties or water uses, Greene and Hastings have provided reasonable assurance that any economic harm caused by the proposed use has been reduced to an acceptable amount. For purposes of determining whether an applicant has provided reasonable assurance that any environmental harm caused by a proposed use of water is reduced to an acceptable amount, the District examines modeling results showing the level of drawdown predicted for the use and also examines the resources in and around the site of a withdrawal to determine the likely impact of the drawdown predicted for the withdrawal on those resources. The District’s environmental scientists examined the Black Sink Mine site and the surrounding landscape and determined that, based on the characteristics of the landscape in and around the site of the proposed withdrawal and based on the negligible drawdown impact predicted for the proposed water use in both the Floridan and surficial aquifers, there will be no environmental harm resulting from the allocation of groundwater contained in the CUP. The use of water proposed by Greene and Hastings will not cause damage to crops, wetlands, or other types of vegetation. The use of water proposed by Greene and Hastings will not cause the water table to be lowered so that stages or vegetation will be adversely and significantly affected on lands other than those owned, leased, or otherwise controlled by Greene and Hastings. The CUP will not use water that the District has reserved pursuant to Section 373.223(3), Florida Statutes, and Rule 40C-2.301(4). No Impact on Established Minimum Flows or Levels No minimum surface or groundwater levels or surface water flows have been established by the District pursuant to Rule Chapter 40C-8 for any of the water bodies in Marion County that may be affected by the proposed water use. The closest water body for which the District has established a minimum flow is the St. Johns River at the State Road 44 bridge located more than 50 miles from the Black Sink Mine property. The closest water body for which the District has established a minimum level is Star Lake in Northwest Putnam County, more than nine miles from the mine site. Because of the distance of these water bodies from the withdrawal site and because of the negligible drawdown expected to be caused by the proposed use of water, the use will not cause an established minimum flow or level to be exceeded during the term of the permit. Other Reasonable-Beneficial Use Considerations All available conservation measures that are economically, environmentally, and technically feasible are proposed for implementation in the application by Greene and Hastings for the uses proposed by them. Greene and Hastings submitted to the District, as part of the application, a conservation plan that complies with the requirements of A.H. Section 10.3(e). Reclaimed water, as defined in the District’s rules, is not currently available to be used in place of the water proposed for use by Greene and Hastings in the application. The use of water proposed by Greene and Hastings in the application will not cause or contribute to a violation of water quality standards in receiving waters of the state. The use of water proposed by Greene and Hastings in the application will not cause or contribute to flood damage. The Use is Consistent With the Public Interest With regard to the determination of whether reasonable assurance was provided that the proposed use is consistent with the public interest, the County contends that: 1) Greene and Hastings must show that any necessary approvals required by the County’s Comprehensive Plan and/or its LDRs for use of the site for producing bottled water have been obtained; 2) that the District did not properly consider the effect of existence of lawn watering restrictions affecting citizens in the County in evaluating the application; and 3) that the District should have considered the amount of money the applicant may stand to gain from the use of the water requested in the application. In examining whether an application is consistent with the public interest, the District considers whether a particular use of water is going to be beneficial or detrimental to the people of the area and to water resources within the state. In this inquiry, the District considers whether the use of water is efficient, whether there is a need for the water requested, and whether the use is for a legitimate purpose; and the inquiry focuses on the impact of the use on water resources and existing legal users. Sale of water for bottling for human consumption is recognized by the District as a legitimate, beneficial economic enterprise. Use of water for human consumption is among the highest and best uses permitted by the District. For reasons outlined above in the Recommended Order, there are no detrimental impacts that will result from this use of water. The District does not consider whether local government approvals have been obtained prior to issuance of a CUP for purposes of determining whether the application is consistent with the public interest. Neither does the District consider impacts related to local roads from trucks transporting the water or other impacts not related to water resources. No such requirements are included in the District’s adopted permitting criteria. There are no water shortage orders in effect in the District at present. In evaluating a CUP application, the District considers whether its permitting criteria will be met during periods of normal weather as well as during periods of drought. Withdrawals authorized in CUPs can be restricted by order of the District during periods of water shortage, such as droughts. Thus, the possibility of a water shortage order being entered in the County in the future, or the fact that such orders may have been in effect there in the past, does not mean the application is not consistent with the public interest. The District critically examines the efficiency of all water uses for purposes of enacting its regulatory requirements regarding CUPs and in evaluating CUP applications. The District has adopted restrictions on landscape irrigation (which apply to all such users throughout the District’s jurisdiction, not just in Marion County) limiting landscape irrigation to no more than two days per week. The limitations on landscape irrigation exist because this type of use has been determined to be a highly inefficient, wasteful use of water without such restrictions. By contrast, the use of water proposed by Greene and Hastings is a highly efficient use of water, resulting in little or no loss or waste of water. The District does not consider the level of financial gain or benefit an applicant will derive from a permitted use of water for purposes of determining whether the proposed use is consistent with the public interest. Most, if not all permitted users of water derive some level of economic benefit from the water they use, and the District’s rule criteria do not provide standards for evaluating such gain or that otherwise limit the amount of such gain. For the foregoing reasons, the Applicant has provided reasonable assurance that the use of water proposed in the application is consistent with the public interest. Groundwater is the Lowest Quality Source for this Use The County contends that groundwater is not the lowest quality source of water available for the use proposed by Greene and Hastings, in that surface water from the mine pit on the site could be treated and used for bottling in place of groundwater. From the testimony, it is clear that Greene and Hastings’s ability to market water for bottling from the Black Sink Mine is dependent on such water being capable of being labeled as spring water, and on such water being delivered without having gone through any treatment processes. The testimony also establishes that because of the connection between the surficial aquifer and the Upper Floridan aquifer at the site, using surface water instead of groundwater to supply the proposed use would result in little if any reduction in impacts to the Floridan aquifer. More importantly, because the application proposes use of water for direct human consumption, the District’s rules do not require use of a lower quality source of water. For the foregoing reasons, groundwater is the lowest quality source of water suitable for use for bottled water for human consumption. The District’s Noticing Was Adequate and Appropriate The District provided notice of its receipt of the Greene and Hastings CUP application by publishing notice in the Ocala Star-Banner, a newspaper of general circulation in Marion County, on January 25, 2005, with an amended notice being published on February 16, 2005, and also by letters to the County dated January 20, 2005, and February 10, 2005. In each notice, the location of the proposed use was identified by section, township, and range. The County responded to the notices by sending a letter of objection to the application dated February 14, 2005. Thus, the County received sufficient information regarding the location of the proposed use to enable it to prepare and file a letter of objection to the application, and suffered no prejudice as a consequence of the notice. The District provided personal notice of its intent to issue a CUP to Greene and Hastings by letter dated April 5, 2006. In this notice, the location of the proposed use was identified by section, township, and range. The County responded by filing petitions that have resulted in this proceeding. Thus, the County received sufficient notice of the location of the use addressed in the District’s intent to issue to enable it to initiate administrative proceedings regarding the permit, and suffered no prejudice as a consequence of the notice.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the District enter an order granting CUP No. 97106 to Greene and Hastings with the conditions recommended in the District’s Technical Staff Report. DONE AND ENTERED this 9th day of January, 2007, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 9th of January, 2007.
The Issue The issue in this case is whether Bocilla Utilities, Inc. is entitled to a public drinking water construction permit for the expansion of an existing reverse-osmosis water plant located on Don Pedro Island.
Findings Of Fact Bocilla Utilities, Inc. (Applicant) was incorporated in the mid-1980s for the purpose of supplying water to a residential development being developed by some or all of the principals of the water utility. The residential development is on a bridgeless barrier island in Charlotte County. Applicant initially proposed locating the plant on the mainland with submerged pipes to the island. This proposal was approved by the Army Corps of Engineers and Department of Environmental Regulation, but the Trustees of the Internal Improvement Trust Fund denied Applicant's request for an easement across submerged state lands. After failing to obtain a submerged land easement, Applicant obtained the permits to build a reverse-osmosis (RO) water plant at its present location on the barrier island. Included among the permits was a permit from the Department of Natural Resources dated September 11, 1985, allowing Applicant to construct the water treatment plant, two underground concrete water storage tanks, and a tennis court on top of the tanks up to 100 feet seaward of the coastal construction control line. Applicant is a certificated utility that, since September 1994, has been regulated by the Public Service Commission. It was previously regulated by Charlotte County. By Application for a Public Drinking Water Facility Construction Permit filed January 26, 1995 (Application), Applicant requested a permit to expand the treatment capacity of its water plant from 30,000 gallons per day (gpd) to 120,000 gpd. By installing the new treatment equipment in two stages, the plant would have an immediate capacity of 60,000 gpd. Applicant proposes no material changes to the existing water storage tanks, distribution system, or the size or location of the building that houses the existing and proposed water treatment equipment. The Application form asks Applicant to identify any well construction permits obtained from the water management district and to provide a map showing any sanitary hazards within 500 feet of each proposed well. The Application form requires Applicant's professional engineer to attest that the project complies with Chapter 62-555, Florida Administrative Code. The Engineering Report attached to the completed Application supplies the requested information, but explains that Applicant's hydrogeologist had not, as of the date of the report, obtained the well-construction permits from the water management district. By Intent to Issue dated February 27, 1995, the Department of Environmental Protection (DEP) gave notice of its intent to issue the requested permit. Noting that it has permitting jurisdiction under Section 403.861(9), Florida Statutes, and that the project is not exempt, DEP determined that a public drinking water construction permit is required for the proposed work. The Intent to Issue is based on DEP's belief that reasonable assurances have been provided to indicate that the proposed project will not adversely impact water quality and the proposed project will comply with the appropriate provisions of Florida Administrative Code Rules 62-4, 62-550, 62- 555 and 62-699. Petitioners timely objected to the issuance of the proposed permit. Petitioners reside in Applicant's certificated area on the barrier island. They presently obtain their water from private wells or cisterns, rather than Applicant. If the permit were granted so as to expand Applicant's production capacity, Petitioners would be more likely required to obtain water from Applicant due to Charlotte County's mandatory hookup ordinance. About a week before filing the Application, Applicant applied on January 20, 1995, to the Southwest Florida Water Management District (SWFWMD) for permits for the construction of the two wells included in the draft permit. SWFWMD granted these permits on February 8, 1995, about three weeks after receiving the applications. Consistent with its normal practice in granting well-construction permits, SWFWMD did not provide interested persons with a point of entry to challenge the permits. The SWFWMD permits provide in part: Compliance with state and local county health regulations as per Chapter 17-555, Florida Administrative Code (F.A.C.), is required via the Drinking Water System Permit. Compliance with Chapters 17-532 and 17- 555, F.A.C., on construction standards and grouting procedures for Public Supply Wells shall be followed. * * * This well site has been judged as satisfactory based on the location and information provided to [SWFWMD] at the time of the well site inspection. . . . * * * Public Supply Wells must meet certain setback requirements from all potential sources of contamination. To obtain and retain your Drinking Water System Permit, please coordinate any future development of the surrounding property within 200' of your well site with the Charlotte County Health Department. * * * By letter dated February 14, 1995, from a SWFWMD representative to Applicant's hydrogeological consultant, SWFWMD acknowledged that it granted Applicant a setback variance of 100 feet from nearby septic systems in permitting the two new wells. The letter states that the "variance is based upon the known geohydrology of the area and the proposed construction of the wells," as well as an understanding that the "existing public system is working out with no problems." A month later, a letter from a DEP engineer identifies various types of sanitary hazards and implicitly ratifies the setback variance granted by SWFWMD. By letter dated March 14, 1995, Gary Maier identified sanitary hazards as septic tank systems, sewer lines, swimming pools and associated chemicals, pet excretions, and residential chemicals such as pesticides, fertilizers, paints, oils, and solvents. Mr. Maier's letter acknowledges that SWFWMD had granted a variance from 200 feet to 100 feet "due to geologic and treatment conditions," but cautions that "any further decrease in setbacks for sanitary hazards would be imprudent." Applicant's water plant is located on Don Pedro Island, which is part of an island chain consisting, from north to south, of Knight Island, Don Pedro Island, and, usually, Little Gasparilla Island. The low-lying island chain fronts the Gulf of Mexico on the west. The northern end of the island chain abuts Lemon Bay on the east. Over the years, storms have opened and closed passes at various points along the island chain. The island chain is vulnerable to flooding, and some areas are more vulnerable than others. One of the historic passes is Bocilla Pass. The plant site area is about a half mile south of this now-closed pass. The Gulf beaches on either side of the point at which the Bocilla Pass emptied into the Gulf have suffered considerable erosion in recent years, to the point that recently built homes have been inundated by water and had to be removed or razed. The plant site area includes the building housing the water treatment and other equipment, two 50,000-gallon storage tanks immediately to the west of the building, the existing water supply well located just east of the building, and the two proposed water supply wells located a short distance east and south of the building. The existing storage tanks, which mark the westernmost extent of the plant site area, are about 235 feet east of a pronounced erosion line along the Gulf shore and are separated from the Gulf by South Gulf Boulevard. Immediately adjacent to the tanks is the building housing the water treatment equipment. The two proposed wells would be located about 200 and 450 feet south of the tanks. The plant site area is much closer to water on the east. The southerly proposed well is about 12 feet west of the mean high water line of Bocilla Lagoon, and the northerly proposed well is about 16 feet west of the mean high water line of Bocilla Lagoon. The building housing the water treatment equipment is further away from the water, but still less than 50 feet. Bocilla Lagoon is a long and narrow waterway that was dredged in a north-south direction parallel to the Gulf shoreline. Bocilla Lagoon is closed off by land less than a quarter of a mile south of the plant site area. The lagoon runs to the north to connect to what remains of Bocilla Pass, which then runs easterly a short distance to a dredged extension of Lemon Bay. The building housing the water treatment equipment and the storage tanks are not located in the vulnerable FEMA V[elocity] zone. However, the record does not establish the location of the proposed wells relative to the V- zone. Testimony concerning the location of the V-zone relative to the water plant establishes only that the building, not the two proposed wells, are safely outside the V-zone. Nothing in the record establishes contour lines on the barrier island in the vicinity of the plant site area or the elevation of the land at the site of the two proposed wells. Applicant has recently upgraded the security of the storage tanks through the addition of locks to the manholes. The installation of fences is impractical and unnecessary because the tanks are topped by a six-inch, reinforced slab of concrete that also serves as tennis courts. The proposed wells would be well constructed. They would extend 167 feet into a confined artesian aquifer. The concrete pressurized grouting coupled with a potentiometric surface of seven feet make it unlikely that the wells would be vulnerable to contaminants. During severe-storm conditions, pumping would cease, leaving the system in its naturally pressurized state, so that surface water could not easily flow down into the well. Additionally, the RO filtration technology is one of the most effective at eliminating contaminants from drinking water. However, failing to have shown that the two proposed wells are outside the V-zone, Applicant has also failed to provide reasonable assurances that the two proposed wells would be protected from damage from the velocity wave action associated with the V-zone. Applicant has constructed and operated the water plant in an exemplary fashion. Applicant has at all times met or exceeded applicable standards for water quality, safety, and operations. Original construction exceeded minimum requirements and added to the durability of the fixtures. The building housing the water treatment equipment and hydropneumatic tank has been issued a floodproofing certificate by a registered engineer. The certificate states that, with human intervention in the form of bolting predrilled plywood boards over openings, the plant is waterproofed to an elevation of 14 feet NGVD, which is one foot higher than the FEMA-supplied base flood elevation of 13 feet NGVD. Applicant employs an operations manager with a Class A license rather than one with merely a Class C license, even though only a Class C operator is required for a water plant of this size. Also, Applicant maintains a low-level chlorine indicator, even though not required to do so due to the small size of the utility. The relevant sewage flows from the quantity of water that would be drawn by each proposed well would be greater than 2000 gpd. Near the proposed wells are single- and multi-family residences served by on-site sewage disposal systems, the above- described road, a swimming pool on the other side of the road, an injection well, and the treatment plant at which Applicant stores anti-scaling agents, ammonia, chlorine, and acid. However, Applicant has shown that none of these items is within 100 feet of the proposed wells. Bocilla Lagoon is not a sanitary hazard at this time. The two deficiencies in Applicant's proof relate solely to the susceptibility of the proposed wells to a significant risk of damage from flooding and other disasters and the location of the proposed wells relative to areas least subject to localized flooding. In all other respects, such as fire flow and security, Applicant has provided reasonable assurances that the applicable criteria would be satisfied or that the proposed work would have no bearing on the issue raised by Petitioners.
Recommendation It is RECOMMENDED that the Department of Professional Regulation enter a final order denying the application of Bocilla Utilities, Inc. for a public water supply construction permit. ENTERED on August 25, 1995, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on August 25, 1995. APPENDIX Rulings on Respondents' Proposed Findings 1-4: adopted or adopted in substance. 5: rejected as irrelevant and repetitious. 6-7 (except last sentence): adopted or adopted in substance. (last sentence): rejected as unsupported by the appropriate weight of the evidence and legal argument. (except last sentence): rejected as subordinate, recitation of testimony, and irrelevant. 8 (last sentence): adopted or adopted in substance. 9: rejected as irrelevant. 10: adopted or adopted in substance, except to extent of legal argument as to effect of action of SWFWMD in granting variance. 11-12: rejected as irrelevant. 13 (except last sentence): adopted or adopted in substance. 13 (last sentence): rejected as irrelevant. 14-17 (except last sentence): adopted or adopted in substance. 17 (last sentence): rejected as legal argument. 18-21: adopted or adopted in substance. 22: rejected as unnecessary. 23: adopted or adopted in substance as to protection from only sanitary hazards. 24-26: adopted or adopted in substance as to description of aquifer, proposed well construction, and efficiency of RO filtration process, but not as reasons in support of Paragraph 23. 27 (first sentence): adopted or adopted in substance. 27 (remainder): rejected as unnecessary. 28: adopted or adopted in substance. 29: rejected as unnecessary. 30-31: adopted or adopted in substance. 32: rejected as irrelevant. 33-40: rejected as unsupported by the appropriate weight of the evidence. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Robert Starr P.O. Box 5337 Grove City, FL 34224 Betty Brenneman P.O. Box 67 Placida, FL 33946 Jim Duff P.O. Box 41 Placida, FL 33946 M. Christopher Bryant Oertel Hoffman P.O. Box 6507 Tallahassee, FL 32314-6507 Thomas I. Mayton, Jr. Assistant General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2440
The Issue Did Respondents violate the provisions of Rules 62-550.518(3), 62-555.320(4)(8), 62-560.410(2)(c), 62555.350(2), and 62-555.345, Florida Administrative Code, as alleged in the Notice of Violation and Orders for Corrective Action, Case Nos. 96-653PW2442B and 96- 653PW2442C dated June 9, 1997?
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: At all times pertinent to this proceeding, the Department, through the Polk County Health Department, under the authority of an Interagency Agreement with the Department of Environmental Protection, was the agency of the State of Florida charged with the responsibility for inspecting and clearing Public Water Systems in Polk County Florida under Section 403.121, Florida Statutes. SDS Properties Investors Group, Inc. (SDS) is a Florida corporation authorized to do business as Budget Motel. SDS is owned by Shaikh. Sanitary surveys are conducted by the Department every three years and include the inspection of Public Water Systems (PWS) . On January 26, 1996, the Department conducted a routine sanitary survey of Budget Motel (Budget) located at 1418 Highway 17 South, Lake Wales, Florida, which should have included Budget's public water system, PWS 6532442. However, Polk County's inspector, Henry Tagioff, was shown a well, by a Budget employee, that was located on the adjacent property owned by Smokey's Mobile Home Park (Smokey's) and not a part of Budget's water system. Tagioff was not aware that the well he inspected was owned by Smokey's and not on Budget's property. During the inspection, Tagioff noted several violations and advised the Budget employee that Tagioff needed to discuss these violations with Shaikh. On January 29, 1996, Tagioff and Lee Forgey, another Polk County employee, met with Shaikh to discuss the violations noted by Tagioff on January 26, 1996. During this meeting, Shaikh, Tagioff, and Forgey discussed the violations previously found by Tagioff on January 26, 1996, concerning the well on Smokey's property. At no time during this meeting did Shaikh advise Tagioff or Forgey that neither he nor Budget own the well under discussion. The record is not clear, but sometime between January and May 1996, Budget's well had collapsed and was not useable. Subsequent to Budget's well collapsing, Shaikh contracted with George Dunham, after obtaining Smokey's permission, to connect Budget's water system (PWS6532442) to Smokey's well. At the time of connecting Budget's water system to Smokey's well, Dunham advised Shaikh that this was only a temporary solution and gave Shaikh a proposal for a new well since Budget's old well could not be repaired. On May 2, 1996, Tagioff made a reinspection of Budget's water system and found that Budget's well had collapsed and was inoperable, and that Budget had connected to Smokey's well to furnish water to the motel and its guests. Tagioff advised Shaikh that Budget would need a new well since its old well was inoperable and the connection to Smokey's well was only temporary. On May 21, 1996, Mark Fallah, a Polk County employee, conducted a site inspection and prepared a report for use in connection with Budget's application with Southwest Florida Water Management District (SWFWMD) for a new well permit. In connection with Fallah's site inspection and report, the Department advised Shaikh by letter dated May 21, 1996, of certain things concerning the new well that had to be completed prior to placing the well into public use. The letter provides in pertinent part as follows: Upon completion of the drilling and the verification of the grouting procedure by the Water Management District, the following items, as required by Chapters 62-555 and 62550 of the Florida Administrative Code, are to be completed prior to this water system being placed into public use. * * * 2. A continuous chlorination unit that is electrically interlocked with the well pump circuit. * * * A flow measuring device is required on all Non-Community Water Systems. A copy of the well completion report must be furnished to this office by the well driller within thirty (30) days after the well installation. Bacteriological clearance of the well must be performed by submitting twenty (20) consecutive water samples for analysis to an HRS certified laboratory. A maximum of two (2) samples per day taken at least six hours apart may be collected. Additional samples may be required until twenty (20) consecutive satisfactory samples are received. * * * After the well and plant construction is completed, contact our office for an inspection so that written clearance can be issued. It is prohibited for any Public water system to be placed into use without clearance being issued from this department. (Emphasis Furnished). SWFWMD approved Budget's new well application and issued Budget Permit No. 579811.01 for drilling a new well. However, upon completion of the new well, there were certain conditions that had to be met as indicated in the letter from the Department dated May 21, 1996. On May 31, 1996, and July 10, 1996, Fallah inspected Budget's new water system for compliance and, on both occasions, found that Budget had failed to install the chlorination unit, the flow meter, and had not submitted a well completion report or bacteriological samples. On July 15, 1996, the Department issued a Warning Notice to Shaikh advising him that the system could not be used until approved by the Department. For enforcement purposes, the file was transferred to Lewis Taylor, enforcement officer for drinking water systems for Polk County. On November 14, 1996, Taylor conducted an inspection of Budget's water system and reported that: (1) Budget's well had been placed into service without approval from the Department; (2) there was no chlorinator in operation; (3) there was no flow meter; (4) the Department had not received any bacteriological samples since November 1995; (5) there was no certified operator servicing the motel's water system; and (6) Budget had not provided public notice to its customers of its failure to monitor its drinking water. A second Warning Notice was issued by the Department and furnished to Shaikh on November 22, 19-96, which in substance advised Shaikh that Budget was in violation of Rules 62-550 and 62- 555, Florida Administrative Code, for its: (1) failure to obtain the Department's clearance before placing its new well in service; (2) failure to provide quarterly bacteriological samples; (3) failure to maintain proper chlorine residual in the water system; failure to provide a flow meter in the water system; (5) failure to provide public notification to its customers that its water system had failed to comply with Rule 62-550, Florida Administrative Code; and (6) failure to provide the Department with verification of Budget retaining a certified operator to oversee the operation and maintenance of its water system. On March 3, 1997, Tagioff and John GoPaul, US Environmental Agency, inspected Budget's water system and found that: (1) there was no chlorine residual in the system; (2) the chlorination unit located at the motel was not in use; (3) there was no flow meter within the system; (4) no quarterly bacteriological samples had been furnished to the Department; and the well had not been cleared for use by the Department. Based on the testimony of Lewis Taylor which I find credible, the Department has expended the following in the inspection of Budget's water system: (1) 20.25 hours of professional time at a rate of $30.00 per hour for a total of $607.50; (2) three hours of clerical time at a rate of $15.00 per hour for a total of $45.00; and (3) $27.00 in travel costs and postage. The total amount expended in the inspection of this water system by the Department was $679.50.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department enter a final order finding Respondents guilty of the violations as charged and requiring Respondents to comply with the Orders for Corrective Action as set out in the Notice of Violation and Orders of Corrective Action in Case Nos. 96-653PW2442B and 96-653PW2442C. It is further recommended that Respondents be required to pay the costs and expenses of investigating the violations and prosecuting this matter in the amount of $679.50. DONE AND ENTERED this 27th day of May, 1998, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6947 Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 1998. COPIES FURNISHED: Angela T. Hall, Agency Clerk Department of Health 1317 Winewood Boulevard, Building 6 Tallahassee, Florida 32399-0700 Roland Reis, Esquire Department of Health Polk County Health Department 1290 Golfview Avenue, 4th Floor Bartow, Florida 33830-6740 Habib U. Shaikh 4014 Billingsgate Road Orlando, Florida 32839-7515 SDS Properties Investors Group, Inc. d/b/a Budget Motel 1418 Highway 17 South Lake Wales, Florida 33853
The Issue The issue in the case is whether the Petitioner's employment position was properly reclassified from Career Service to Selected Exempt Service pursuant to Section 110.205(2)(x), Florida Statutes (2001).
Findings Of Fact Beginning on April 23, 2001, and at all times material to this case, the Petitioner was employed by the Hillsborough County Health Department as a Professional Engineer III, a position requiring state registration in accordance with Chapter 471, Florida Statutes (2001). The job announcement related to the Petitioner's employment states that the position "oversees" the drinking water program and engineering-related activities. The position was responsible for management of "Safe Drinking Water" permitting and compliance enforcement program entailing a variety of duties, including planning, organizing, and coordinating work assignments. According to organizational charts before and after the date of the reclassification of the position, the Professional Engineer III position had direct supervision of four employment positions, and indirect supervision of eight additional positions that reported to one of the Petitioner's direct employees. The position of Professional Engineer III includes a substantial amount of engineering review responsibilities, and is charged with direct supervision of the Safe Drinking Water Act program staff and Limited Use Drinking Water program staff. The position description categorized the job responsibilities as "regulatory," "supervising/training," "enforcement," "policies and procedures," "record keeping," "education," and "committees/other duties." Review of the specific duties indicates that the Petitioner's supervisory responsibilities were included within several of the categories. Included within the "regulatory" category was "[e]nsures staff conduct field inspections of public water systems. . . . Supervisor is responsible and accountable for field staff." Included within the "supervising/training" category were the following duties: Supervises Engineers to ensure all programs in the Safe Drinking Water Program are completed according to the agreement with DEP and the policies and procedures of the Department of Health. Supervises an Environmental Supervisor II to ensure that all programs in the Limited Use Drinking Water Program and Private Drinking Water Program are completed according to the F.S., F.A.C. and county regulations. Supervises staff review of engineer's plans. Supervises and reviews the preparation of non-compliance letters written by staff regarding enforcement actions. Provide training to new Health Department staff in all aspects of EHS at least once a year (standardized presentation). Perform field inspections (documented) with personnel on a quarterly basis to evaluate staff performance and for Quality Improvement (QI) in accordance with office policy. Telephone regulated facilities each quarter to determine customer satisfaction . . . in accordance with office policy. Develop training modules for specific program areas (public drinking water systems) and maintain them accurate and current. Provide those training modules to new EH staff and twice a year to existing EH staff. Assign staff to special work areas as necessary and perform field inspections (staff shortages, vacation/leave time, and natural disaster). Evaluate personnel's work, plan work load, special tasks to include efficiency. Included within the "enforcement" category were the following duties: Reviews appropriate enforcement activities generated by staff and assure timely progress of formal enforcement from compliance to enforcement. Ensures the time progress of enforcement cases by working closely with the compliance section of the Public Drinking Water Program in bringing non-compliant clients into enforcement. Follow up on violations of FAC and/or FS and ensure compliance is achieved or enforcement action is taken. Included within the "policies and procedures" category was the responsibility to "[r]eview daily activity reports and corresponding paperwork each day." The Petitioner was responsible for managing the daily workflow of the office. He planned, directed, and reviewed the work performed by his employees. The Petitioner was responsible for the evaluation of all employees under his direct supervision, including newly hired probationary employees. The Petitioner was responsible for review of the evaluations for employees for whom he had indirect supervisory duties, and he also provided his own independent evaluation of their performance. The Petitioner was responsible for the discipline of employees. At one point he had to counsel an employee who was consistently late to arrive for work. The Petitioner was also responsible for seeking qualified applicants for position openings. He was responsible for initiating the employment process. He chose the panel that interviewed applicants, designed the interview questions, participated in interviews, and made the final recommendation as to the person hired. He had the authority to decline to fill an open position if he deemed that the applicants lacked sufficient qualification. The Petitioner claims that the majority of his time was spent in review of permit applications and related engineering tasks. The evidence fails to support the assertion. The Petitioner's claim appears to essentially relate to a period of time subsequent to the July 1, 2001, reclassification of the position. During the time between his initial employment and the date of the position reclassification, the Petitioner was primarily a supervisory employee and had little, if any, permit review responsibilities. The office was fully staffed with other employees who were directly responsible for review of permit applications and related field reviews. In autumn of 2001, after the position was reclassified, the office began to lose employees, resulting in an increased workload for the remaining workers. At this point, the Petitioner began to undertake a substantial role in the actual review of permit applications in addition to his supervisory duties. Nonetheless, the Petitioner remained responsible for supervision of remaining employees. The Petitioner was also responsible for filling the vacant positions.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Education enter a Final Order finding that the "Professional Engineer III" position held by Raymond Van Loon on July 1, 2001, was properly classified into the Selected Exempt Service. DONE AND ENTERED this 21st day of April, 2004, in Tallahassee, Leon County, Florida. S WILLIAM F. QUATTLEBAUM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2004. COPIES FURNISHED: Stephen W. Foxwell, Esquire Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1703 Aaron J. Hilligas, Esquire AFSCME Council 79 3064 Highland Oaks Terrace Tallahassee, Florida 32301 Maria N. Sorolis, Esquire Allen, Norton & Blue, P.A. 324 South Hyde Park Boulevard Hyde Park Plaza, Suite 350 Tampa, Florida 33606 Jerry G. Traynham, Esquire Patterson & Traynham Post Office Box 4289 315 Beard Street Tallahassee, Florida 32315 William E. Large, General Counsel Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 R. S. Power, Agency Clerk Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701
Findings Of Fact Application 7500165 requested average withdrawal of water of 1,804,750 gallons per day from 4 wells located about a mile east of Highway 41 and a mile north of Apollo Beach. The four wells would be for irrigation of tomato crops on total acreage of 4 acres located in Hillsborough County (Exhibit 1, Testimony of Elsberry and Boatwright). Notice of hearing as to the application was published in a newspaper of general circulation in accordance with statute and rule (Exhibit 3). A letter of objection from Joseph S. Benham, Apollo Beach, Florida, dated November 19, 1975 was submitted to the Water Management District, wherein he expressed concern regarding water shortages and, although he does not seek to totally deny the application, is of the belief that the district must insure sufficient controls and management of irrigation activities so that resources are not wasted, water runoff to drainage ditches is eliminated and renewed justification is given each year for the withdrawal (Exhibit 2). A representative of the District staff established that there would be no violation of statutory or regulatory requirement for issuance of a consumptive water use permit in this case except as to the fact that potentiometric level of the applicant's property would be lowered below sea level as a result of withdrawal. It was agreed at the hearing that a period of thirty days should be granted both parties to formulate a stipulation as to control of runoff. An unsigned stipulation was received from the Water Management District by the hearing officer on March 1, 1976, which provided that the permit would be granted with the following stipulations: Runoff from the property will be limited to 25 percent of the quantity pumped and by December 31, 1980 shall be reduced to 16.5 percent of the quantity pumped. The District may at its own expense install metering devices for the purpose of monitoring runoff. The permittee will be notified in advance of such action. The Permit will expire on December 31, 1980. (Testimony of Boatwright, Exhibit 4).
Recommendation That application 8500165 submitted by Elsberry and Elsberry, Inc. Route 2, Box 70 Ruskin, Florida, for a consumptive water use permit be granted with the conditions as follow: Runoff from the property will be limited to 25 percent of the quantity pumped and by December 31, 1980 shall be reduced to 16.5 percent of the quantity pumped. The District may at its own expenseinstall metering devices for the purpose of monitoring runoff. The permittee will be notified in advance of such action. The Permit will expire on December 31, 1980. That the Board grant an exception to the provision of Rule 16J- 2.11(4)(e), F.A.C., for good cause shown. DONE and ENTERED this 15th day of March, 1976, in Tallahassee, Florida. THOMAS C. OLDHAM Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District Post Office Box 457 Brooksville, Florida 33512 Elsberry & Elsberry, Inc. Route 2, Box 70 Ruskin, Florida